Text · page 29 of 54
Read the whole document on one page (all 54 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Solar Energy Systems Chapter 95A 95A-4C: Utility-scale solar energy systems are only permitted in C-1, C-2, and C-3 zoning districts. 95A-5E: Utility-scale solar energy systems and all solar energy systems over 25 kw shall be subject to all provisions of this chapter and permitted only in the approved districts (C-1, C-2, and C-3) zoning districts. These systems shall require a special use permit , site plan approval from the Town Board and a building permit from the Town of Aurora Building Department. 95A-6C(5): The total surface area of a non-utility-scale said solar energy system on a lot situated in an Agriculture (A) and Commercial (C1, C2, and C3) District shall not exceed 5% of the total square footage of the entire lot. 95A-6C(6): The total surface area of a utility-scale solar energy system on a lot which is greater than two acres situated in Commercial (C1, C2, and C3) District shall not exceed 10% of the total square footage of the entire lot. 95A-8B(2): As regulated for accessory structures in the Commercial (C1, C2, and C3) uses in Chapter 116 of the Town Code.