PBA05.14.2026packet (full text)
Page 1
WEST SENECA
PLANNING BOARD
1300 Union Road, West Seneca, NY 14224
6:00 PM in the Community Center
May 14, 2026
AGENDA
Meeting # 2026-05
CALL TO ORDER
APPROVAL OF PROOFS OF PUBLICATION
APPROVAL OF MINUTES
1. Minutes of Meeting #2026-03
OLD BUSINESS
NEW BUSINESS
SPR 2026-002
A request of New Leaf Energy, Inc. for site plan approval for property located at 705
Orchard Park Road to permit an EV Parking Station and all associated site work.
2026-002
A request of Held Development and Properties, LLC for rezoning of property located at
1475 Orchard Park Road to allow A Custom Sewing Shop to operate in the existing
building.
SPR 2026-003
A request of Home Leasing, for site plan approval for a property located at 2544 Clinton
Street to permit a 3-story multi-unit residential building with all associated site work.
ADJOURN
Page 1 of 359
Page 2
WEST SENECA COMMUNITY CENTER Planning Board PROCEEDINGS
1300 Union Road Minutes #
West Seneca, NY 14224 March 12, 2026
ROLL CALL: Present: Chairperson Margaret Bebak
Planning Board Member Eric Sailer
Planning Board Member Jim Frick
Planning Board Member Joseph Sherman
Planning Board Member Tim Hayes
Planning Board Member Mark Beehler
Planning Board Member William Wise
Absent:
CALL TO ORDER
APPROVAL OF PROOFS OF PUBLICATION
APPROVAL OF MINUTES
1. Minutes of Meeting #2026-02
OLD BUSINESS
SPR2026-001
A request from Julius Aebly for property located at 1465 Union Rd. to permit the construction of a +/-
2,500 SF bank with drive-thru.
Anthony Pandolfe the project manager with Carmina Wood Design, stated
-We revised the plan on the corridor overlay and added a bench to the site that is located next to the
flagpole.
-The last meeting we were asked to check on the code regarding ATMs. When we looked into it, the
code that was brought up was only for freestanding machines. Our machine will be against the wall in
the drive-through lane, which is not considered a freestanding machine.
-Engineered plans were submitted to Clark Patterson Lee and given an initial comment letter.
-a sewer profile and minor landscape revisions were done.
-confirmation from the town engineer that the SWIP from the previously approved office building next
door, that SWIP is still in place and will resume SWIP inspections until finished.
-Clark Peterson Lee issued an approval letter with a couple recommendations for contingencies of
approval
-One of them is the water service. We have submitted it to the water authority, and it is under
review.
-questioned if National Fuel was being used or NYSEG. NYSEG would be the provider.
-A ZBA meeting was attended last month for a variance requirement for the drive-through stacking.
That variance was granted for 8 cars.
-A letter from Erie County DPW requesting a queuing analysis be done.
-Our traffic engineer consultant will work on that and, if the board sees fit, we will make that a
contingency of approval.
1
Page 2 of 359
Page 3
WEST SENECA COMMUNITY CENTER Planning Board PROCEEDINGS
1300 Union Road Minutes #
West Seneca, NY 14224 March 12, 2026
Mr. Sherman questioned the environmental assessment comprehensive plan being identified as LOS
"E" which F is the highest in volume, and would like another traffic study done.
Mr. Scheiber stated this was approved when a restaurant was going in this location which would have
a heavier traffic volume, but we will continue with a traffic study by the county.
Mr. Sherman wants to see another study done by the Department of Public Works in regard to the
traffic before he signs off on this.
Mr. Pandolfe mentioned if there were more than 8 vehicles in the drive-thru, they could stack into the
parking lot rather than on Union Rd.
Mr. Schieber recapped the landscaping on the plans, with shrubs small enough that will not obstruct
the view of the traffic lines.
Mr. Sherman wanted to amend the zoning from a C to an S since this was originally approved for a
restaurant, and now it is a bank.
Mr. Scheiber stated it will remain as is.
Mr. Hayes asked if the name of the bank could be disclosed.
Mr. Scheiber announced the name of the bank was Canal Bank.
Mr. Beehler states there is a location in Williamsville on Main St.
Mr. Sherman questioned who the proposed tenant or owner of the building was.
Mrs. Bebak stated it is on the building owner.
The public question by Eric Meinder was why does it matter if it is a bank or restaurant?
Mrs. Bebak answered that it was originally approved to be a restaurant with a drive-thru and now is a
bank with a drive-thru.
Motion by Chairperson Bebak, seconded by Planning Board Member Frick,
Ayes: 7 Noes: 0 Abstain: 0 Motion Carried
NEW BUSINESS
ADJOURN
6:21pm Motion by Chairperson Bebak, seconded by Planning Board Member Beehler, to table
conditions such as, a letter from the engineers' application from the Water Authority for approval of
proposed water services, to coordinate with NYSEG during construction, for final approval of the
proposed planting locations and the requirement of the Erie County Department of Public Works
approval on the traffic.
Ayes: 0 Noes: 0 Abstain: 0 Motion Carried
2
Page 3 of 359
Page 4
WEST SENECA COMMUNITY CENTER Planning Board PROCEEDINGS
1300 Union Road Minutes #
West Seneca, NY 14224 March 12, 2026
ROLL CALL: Present: Chairperson Margaret Bebak
Planning Board Member Eric Sailer
Planning Board Member Jim Frick
Planning Board Member Joseph Sherman
Planning Board Member Tim Hayes
Planning Board Member Mark Beehler
Planning Board Member William Wise
Absent:
CALL TO ORDER
APPROVAL OF PROOFS OF PUBLICATION
APPROVAL OF MINUTES
1. Minutes of Meeting #2026-02
OLD BUSINESS
SPR2026-001
A request from Julius Aebly for property located at 1465 Union Rd. to permit the construction of a +/-
2,500 SF bank with drive-thru.
Anthony Pandolfe the project manager with Carmina Wood Design, stated
-We revised the plan on the corridor overlay and added a bench to the site that is located next to the
flagpole.
-The last meeting we were asked to check on the code regarding ATMs. When we looked into it, the
code that was brought up was only for freestanding machines. Our machine will be against the wall in
the drive-through lane, which is not considered a freestanding machine.
-Engineered plans were submitted to Clark Patterson Lee and given an initial comment letter.
-a sewer profile and minor landscape revisions were done.
-confirmation from the town engineer that the SWIP from the previously approved office building next
door, that SWIP is still in place and will resume SWIP inspections until finished.
-Clark Peterson Lee issued an approval letter with a couple recommendations for contingencies of
approval
-One of them is the water service. We have submitted it to the water authority, and it is under
review.
-questioned if National Fuel was being used or NYSEG. NYSEG would be the provider.
-A ZBA meeting was attended last month for a variance requirement for the drive-through stacking.
That variance was granted for 8 cars.
-A letter from Erie County DPW requesting a queuing analysis be done.
-Our traffic engineer consultant will work on that and, if the board sees fit, we will make that a
contingency of approval.
1
Page 4 of 359
Page 5
WEST SENECA COMMUNITY CENTER Planning Board PROCEEDINGS
1300 Union Road Minutes #
West Seneca, NY 14224 March 12, 2026
Mr. Sherman questioned the environmental assessment comprehensive plan being identified as LOS
"E" which F is the highest in volume, and would like another traffic study done.
Mr. Scheiber stated this was approved when a restaurant was going in this location which would have
a heavier traffic volume, but we will continue with a traffic study by the county.
Mr. Sherman wants to see another study done by the Department of Public Works in regard to the
traffic before he signs off on this.
Mr. Pandolfe mentioned if there were more than 8 vehicles in the drive-thru, they could stack into the
parking lot rather than on Union Rd.
Mr. Schieber recapped the landscaping on the plans, with shrubs small enough that will not obstruct
the view of the traffic lines.
Mr. Sherman wanted to amend the zoning from a C to an S since this was originally approved for a
restaurant, and now it is a bank.
Mr. Scheiber stated it will remain as is.
Mr. Hayes asked if the name of the bank could be disclosed.
Mr. Scheiber announced the name of the bank was Canal Bank.
Mr. Beehler states there is a location in Williamsville on Main St.
Mr. Sherman questioned who the proposed tenant or owner of the building was.
Mrs. Bebak stated it is on the building owner.
The public question by Eric Meinder was why does it matter if it is a bank or restaurant?
Mrs. Bebak answered that it was originally approved to be a restaurant with a drive-thru and now is a
bank with a drive-thru.
Motion by Chairperson Bebak, seconded by Planning Board Member Frick,
Ayes: 7 Noes: 0 Abstain: 0 Motion Carried
NEW BUSINESS
ADJOURN
6:21pm Motion by Chairperson Bebak, seconded by Planning Board Member Beehler, to table
conditions such as, a letter from the engineers' application from the Water Authority for approval of
proposed water services, to coordinate with NYSEG during construction, for final approval of the
proposed planting locations and the requirement of the Erie County Department of Public Works
approval on the traffic.
Ayes: 0 Noes: 0 Abstain: 0 Motion Carried
2
Page 5 of 359
Page 6
17 Computer Drive West
Albany, NY 12205
518.438.9900
70 Linden Oaks, Third Floor
Rochester, NY 14625
Via Overnight Delivery 585.866.1100
March 26, 2026.
Town of West Seneca
1250 Union Road
West Seneca, NY 14224
Attention: Jeffery Schieber
RE: Application for Site Plan Review
Proposed EV Charging Stations
705 Orchard Park Road \ NYS Route 240
Town of West Seneca, Erie County
Tax Account 143.06-1-16
Dear Mr. Schieber,
On behalf of our client, New Leaf Energy, Inc., we are pleased to submit the application documents
enclosed for Planning Board review. Enclosed please find the following items in support of our
application:
A. (22) Copies of the Letter of Intent, prepared by Bohler, dated 3/26/26.
B. (22) Copies of the Site Plan Application
C. (22) Copies of the Short Environmental Assessment Form, prepared by Bohler, dated 3/26/26
D. (22) Copies of the Canopy Rendering, prepared by Weston & Sampson design Studio
E. (1) 11x17 Copy of the Boundary & Topographic Map, prepared be Colliers, dated 8/15/25
F. (1) 11x17 Copy of the Site Plan, prepared by Bohler, dated 3/26/26
G. (22) Full-size copies of the Boundary & Topographic Map, prepared by Colliers, dated 8/15/25
H. (22) Full-size copies of the Site Plan, prepared by Bohler, dated 3/26/26
I. Check in the amount of $600 for Planning Board Review Fee
J. Email with a pdf of all submitted documents.
Existing Conditions
The existing 0.143-acre parcel is located between the Mobil gas station and the Wendy’s restaurant rear
parking area. The site is undeveloped and consists of maintained lawn. There is an existing curb cut with
an asphalt driveway apron. The site sheet flows west to east toward Orchard Park Road.
Proposed Project
The applicant is proposing to construct (10) EV charging parking spaces with (5) EV Charging Stations
and a canopy. One EV charging station will service two parking spaces. An ADA compliant space is being
provided. The project will include associated site improvements consisting of modifying the existing curb
cut onto Orchard Park Road, stormwater mitigation, transformer and electrical power equipment.
Zoning
The project site is zoned C-1 commercial where EV charging stations are an allowed use. Given the size
of the existing parcel, we anticipate area variances will be required for pavement setbacks (10’ required,
3’ proposed) and building setbacks (40’ front, 5’ side and 30’ rear required, 6.6’ front, 0’ side and 22.0’
rear proposed). We will make application to the Zoning Board of Appeals to request area variances.
www.BohlerEngineering.com
Page 6 of 359
Page 7
Proposed EV Charging Stations Site Plan Review
705 Orchard Park Road Page 2 of 2
West Seneca, NY 14224
Stormwater
The project will disturb ±0.14 acres of land and substantially decrease green space. To mitigate
stormwater runoff, an underground pipe detention system is proposed to reduce post construction
discharge rates to pre-existing discharge rate. The intent would be to utilize perforated pipe to allow for
infiltration. Infiltration testing will be completed to confirm the design.
Construction Schedule
The intent would be to start construction once all municipal approvals and permits are obtained. It is
estimated that the duration of construction will be ±4 weeks.
We look forward to presenting this information at the May 14th Town Planning Board meeting. If you have
any questions, please do not hesitate to contact our office.
Sincerely,
BOHLER ENGINEERING NY, PLLC
Randy Bebout
Cc:
James Rambone, New Leaf Energy
www.BohlerEngineering.com
Page 7 of 359
Page 8
3/24/26
PROPOSED EV CHARGING STATIONS
705 ORCHARD PARK ROAD (BETWEEN MOBIL & WENDY'S)
NEW LEAF ENERGY, INC. 978-483-0037
55 TECHNOLOGY DRIVE, SUITE 102,LOWELL, MA 01851
GLR HOLDINGS, LLC 585-262-3630
180 Canal View Blvd. Suite 600, Rochester, New York 14623
BOHLER ENGINEERING NY, PLLC 585.866.1100
70 LINDEN OAKS, THIRD FLOOR, ROCHESTER, NY 14625
143.06-1-16
PROPOSED CONST. OF (10) EV CHARGING PARKING SPACES W\CANOPY,(5) CHARGING STATIONS, NEW
ACCESS DRIVE AND ASSOCIATED SITE IMPROVEMENTS (STORM DRAINAGE, ELECTRICAL EQUIPMENT, ETC.)
0.143 N/A
ORCHARD PARK ROAD, APPROX. 45' OF FRONTAGE
C-1,COMMERCIAL NO CHANGE
UNDEVELOPED
EV CHARGING STATIONS
COMMERCIAL
N/A N/A
AREA VARIANCES WILL BE REQURED FOR PAVEMENT AND STRUCTURE SETBACKS
Page 8 of 359
Page 9
Page 9 of 359
Page 10
Page 10 of 359
Page 11
Page 11 of 359
Page 12
Page 12 of 359
Page 13
OP 1 | PULL-IN PARKING
Page 13 of 359
Page 14
OP 1 | BACK-IN PARKING
Page 14 of 359
Page 15
Project:
1) DESIGN CRITERIA FLAT ROOF SNOW LOAD, Pf = 30.0 PSF
SNOW EXPOSURE FACTOR, Ce = 1.00
A. STRUCTURAL DESIGN IS IN ACCORDANCE WITH THE THERMAL FACTOR, Ct = 1.20
COLUMN REACTIONS @ GRIDLINE 1
FOLLOWING CODES AND CRITERIA: IMPORTANCE FACTOR, IS = 1.00
180° MOMENT MOMENT MOMENT
HORIZONTAL HORIZONTAL VERTICAL
REACTION ABOUT REACTION ABOUT REACTION ABOUT
1. MASSACHUSETTS BUILDING CODE USED TO ADDRESS 2) STRUCTURAL STEEL LOAD CASE REACTION, X-DIR. REACTION, Z-DIR. REACTION, Y-DIR.
X-DIR Y-DIR Z-DIR
SNOW LOAD FOR EXAMPLE PURPOSES. EACH DESIGN 90° 270° (KIP) (KIP) (KIP) EV CANOPIES
WILL BE REFINED PER LOCATION. (KIP-FT) (KIP-FT) (KIP-FT)
1. ASTM SPECIFICATION AND GRADE. UNLESS NOTED Y
2. 10TH EDITION OF THE MASSACHUSETTS BUILDING
OTHERWISE ON THE DRAWINGS, STRUCTURAL STEEL
X SELF-WEIGHT ~ ~ 4.14 ~ ~ -34.6
CODE Z
SHALL BE AS FOLLOWS: DEAD LOAD ~ ~ 7.20 ~ ~ -85.8
2.1. BASED OFF 2021 INTERNATIONAL BUILDING CODE 0°
a) W-SHAPES: A992 Z
3. ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS
b) HSS, RECTANGULAR: A500, Gr. C - Fy = 50 ksi
X SNOW LOAD ~ ~ 14.4 ~ ~ -172
AND OTHER STRUCTURES
ROOF LIVE ~ ~ 9.60 ~ ~ -115
4. AISC360-16, AMERICAN INSTITUTE OF STEEL
3) FOUNDATION NOTES WIND 0° A -4.67 ~ -9.14 ~ ~ 164
CONSTRUCTION
1. FOUNDATION DESIGNED BASED ON THE FOLLOWING NOTES:
PROPERTIES: WIND 0° B -4.67 ~ 7.31 ~ ~ -89.6
B. BUILDING CLASSIFICATION
SOIL BEARING PRESSURE (NET) : 1,500 PSF · ALL REACTIONS ARE SERVICE LEVEL (UNFACTORED) WIND 90° A ~ 0.96 5.72 -11.5 -11.3 -68.1
SUBGRADE MODULUS: 100 PCI · NEGATIVE VERTICAL REACTION (Y-AXIS) INDICATES UPLIFT
1. BUILDING OCCUPANCY CLASSIFICATION: U
NOTE: PROOF ROLL THE EXPOSED SUBGRADE WITH A
· ALL WIND AND SEISMIC REACTIONS ARE REVERSIBLE WIND 90° B ~ 0.96 -5.30 -11.5 -11.3 63.1
· ALL WIND REACTIONS ARE PROVIDED AT VULT
MEDIUM-WEIGHT ROLLER TO DETERMINE IF ANY
· ALL SEISMIC REACTIONS TO BE MULTIPLIED BY APPROPRIATE ΩO
WIND 180° A 4.67 ~ -9.17 ~ ~ 53.6 Weston & Sampson Engineers, Inc.
C. DEAD LOADS = 15.0 PSF POCKETS OF SOFT, UNSUITABLE MATERIAL EXIST
FACTORS FOR ANCHORAGE AND FOUNDATION DESIGN WIND 180° B 4.67 ~ 7.31 ~ ~ -84.6 55 Walkers Brook Drive, Suite 100
BENEATH THE EXPOSED SUBGRADE. REMOVE ANY Reading, MA 01867
D. LIVE LOADS UNSUITABLE MATERIAL ENCOUNTERED AND REPLACE
FOUNDATION PLAN NOTES: 978.532.1900 800.SAMPSON
WITH A PROPERLY COMPACTED GRANULAR MATERIAL
ROOF = 20.0 PSF www.westonandsampson.com
1. FINAL GRADE ELEVATION: 100'-0"
REDUCIBLE PER 780 CMR, 10TH EDITION A. OWNER/CONTRACTOR SHALL RETAIN THE SERVICES OF
A GEOTECHNICAL ENGINEER TO VERIFY THAT THE 2. F# SIGNIFIES FOUNDATION SCHEDULE MARK
F# Consultants:
E. WIND LOADS DESIGN CRITERIA ABOVE NOTED FOUNDATION DESIGN PRESSURES AND
MODULUS ARE MET
DESIGN WIND SPEED, VULT = 127 MPH
B. OWNER/CONTRACTOR SHALL EMPLOY QUALIFIED
NOMINAL WIND SPEED, VASD = 97 MPH
INDEPENDENT SOIL-TESTING AGENCY TO VERIFY THAT Complete Structural Consulting
RISK CATEGORY = II ALL EXCAVATION AND BACKFILL OPERATIONS MEET THE 9880 Westpoint Drive, Suite 100
EXPOSURE CATEGORY = C CRITERIA OF THESE NOTES AND THE SPECIFICATIONS
Indianapolis, IN 46256
INTERNAL PRESSURE, GCpl = +/- 0.00
317.468.2004
VELOCITY PRESSURE, Kd = 0.85 C. ENGINEERED FILL SHALL BE CLEAN, WELL GRADED, AND
FREE DRAINING IN ITS COMPACTED STATE
F. SEISMIC DESIGN CRITERIA
D. GRANULAR FILL MATERIAL SHALL BE A "PIT RUN GRAVEL"
DESIGN CATEGORY = B AS IT OCCURS IN A NATURAL STATE WITH NO LUMPS OF
IMPORTANCE FACTOR, Ie = 1.00 CLAY OR ROCKS LARGER THAN 2" IN DIAMETER. IT MUST
CONFORM TO THE FOLLOWING GRADATIONS: 10 TO 40
MAPPED SPECTRAL RESPONSE ACCELERATION:
PERCENT SAND, 40 TO 80 PERCENT GRAVEL, AND 0 TO 15
SS = 0.198 g
PERCENT CLAY. OBTAIN FROM A BORROW PIT
S1 = 0.055 g APPROVED BY THE OWNER AND THE TESTING AGENCY
SITE CLASS = D
SPECTRAL RESPONSE COEFFICIENTS: E. COMPACT ALL GRANULAR FILL BENEATH SLABS ON
SDS = 0.211 g GRADE AND OVER FOOTINGS TO 95 PERCENT MODIFIED
SD1 = 0.088 g MAXIMUM DRY DENSITY, ASTM D-1557. INCREASE THE
SEISMIC FORCE RESISTING SYSTEM: COMPACTION REQUIREMENTS FOR ENGINEERED FILL
STEEL SYSTEM NOT SPECIFICALLY DETAILED FOR SUPPORTING FOOTINGS TO 97 PERCENT MODIFIED N
SEISMIC RESISTANCE MAXIMUM DRY DENSITY, ASTM D-1557. COMPACT ALL
BACKFILL NOT SUPPORTING SLABS, PAVEMENT, OR
R = 3.00
FOOTINGS TO 90 PERCENT MODIFIED MAXIMUM DRY
CS = 0.071 DENSITY, ASTM D-1557. PLACEMENT AND COMPACTION
OF FILL SHALL BE OVERSEEN BY THE TESTING AGENCY.
W E
ANALYSIS PROCEDURE USED: PLACE ALL GRANULAR FILL MATERIAL IN LAYERS NOT
EQUIVALENT LATERAL FORCE EXCEEDING 6" IN LOOSE THICKNESS. MECHANICALLY
COMPACT EACH LAYER TO AT LEAST THE REQUIRED
G. SNOW LOADS MINIMUM DRY DENSITY S
GROUND SNOW LOAD, Pg = 30.0 PSF F. ALL BACKFILL PLACED AGAINST CONCRETE WALLS
SHALL BE A WELL-GRADED, FREE-DRAINING, GRANULAR 20 0 10 20
Note: MATERIAL APPROVED BY THE TESTING AGENCY
Loads from Carver, Massachusetts were chosen for demonstration 4) CONCRETE 1" = 20'
purposes. Each design will be updated and refined based on the site (IN FEET)
and final loading criteria
1. ALL CONCRETE SHALL BE MINIMUM 4,000 PSI WITH A
MINIMUM AIR ENTRAINMENT OF 6%.
2. ALL STEEL REINFORCEMENT BARS SHALL BE ASTM
A615 GRADE 60.
3. ALL STEEL REINFORCEMENT SPLICES SHALL BE
LAPPED A MINIMUM OF 42", UNLESS NOTED
OTHERWISE.
No. Description Date
Revisions
Seal:
DRAFT
Issued For:
REVIEW
(NOT FOR CONSTRUCTION)
Issued Date: 12/12/2024
Drawn By: RRK
Reviewed By: ASK
Approved By: ASK
W&S Project No.:
Drawing Title:
GENERAL NOTES
Sheet Number:
S100
Page 15 of 359
Page 16
Project:
1 12
1
1/2
Dt EV CANOPIES
HSS PURLINS
SPACED @ 5'-0" C/C
3 W16x67
HSS7x4x16 PURLINS SPACED BEAMS
@ 5'-0" C/C TYP. MAY BE
FLUSH BOLTED OR TOP MOUNTED
Weston & Sampson Engineers, Inc.
55 Walkers Brook Drive, Suite 100
BUILT-UP WIDE FLANGE COLUMNS, Reading, MA 01867
978.532.1900 800.SAMPSON
FLANGE THK: 13
16"
24'-0"
www.westonandsampson.com
WEB THK: 21"
12'-8"
Dt:1'-6"
10'-11"
Consultants:
Db:2'-0"
FOUNDATION PER SCHEDULE
FINAL TO BE AT FROST DEPTH Complete Structural Consulting
9880 Westpoint Drive, Suite 100
Indianapolis, IN 46256
317.468.2004
Db
WIDE FLANGE BEAM
N
24'-0"
W E
24'-3"
S
SECTION CUT
2 SCALE: 1/2" = 1'-0"
20 0 10 20
96'-0"
1" = 20'
(IN FEET)
F1 TYP. 3'-0"
3"
24'-0"
(4)ø1 1/2" ANCHOR RODS,
20" EMBEDMENT
13'-0"
3"
2'-6"
2 3/4" BASE PLATE
No. Description Date
Revisions
Seal:
TYP.
1/2
DRAFT
24'-0"
Issued For:
6'-6" 6'-6"
REVIEW
(NOT FOR CONSTRUCTION)
P:\24.0812 EV Canopies (WSE)\04 DWGs & MODELS\_CSC DRAWINGS\EV Canopy_Shareable.dwg
Issued Date: 12/12/2024
13'-0" Drawn By: RRK
Reviewed By: ASK
Approved By: ASK
FOUNDATION PLAN VIEW W&S Project No.:
3 SCALE: N.T.S
Drawing Title:
5'-0" 5'-0" 5'-0" 5'-0"
PULL IN PARKING
STRUCTURAL SCHEDULE
STEEL WEIGHT REINFORCING REINFORCING TOP / FTG.
MARK SIZE (L x W x T) NOTES
PLAN VIEW (LBS) (TOP) (BOTTOM) ELEVATION
1 SCALE: 3/16" = 1'-0" 4,800 PER BAY FURTHER BORING REQUIRED AND
Sheet Number:
F1 (INCLUDES 13'-0" x 13'-0" X 2'-0" (10) #5 EA. WAY (22) #5 EA. WAY 100'-0" SOIL CONDITIONS TO BE CONFIRMED
PURLINS) PER LOCATION
S200
Page 16 of 359
Page 17
&
Engineering
Design,
Architecture,
Surveying, CT Landscape
P.C. Architecture,
N
W E
Engineering
& Design
NORTH
www.colliersengineering.com
Copyright © 2025. Colliers Engineering & Design All Rights Reserved. This drawing and all the
information contained herein is authorized for use only by the party for whom the services
were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed,
S distributed or relied upon for any other purpose without the express written consent of
Colliers Engineering & Design.
Formerly Known as
C O+ SURVEYING
ENGINEERS N S U L T I N G
REV DATE DESCRIPTION
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
NEW LEAF ENERGY
LEGEND
705 ORCHARD PARK ROAD
TOWN OF WEST SENECA
ERIE COUNTY, N.Y.
ABBREVIATIONS
By: MICHAEL.ENNIS on 2025-08-21 -- 03:17pm
BUFFALO (BA)
40 LaRiviere Drive,
Suite 200
Buffalo, NY 14202
Phone: 716.852.3211
Engineering COLLIERS ENGINEERING & DESIGN, &
Engineering
Design,
Architecture,
Surveying, CT Landscape
P.C. Architecture,
& Design ARCHITECTURE, LANDSCAPE ARCHITECTURE,
SURVEYING CT, P.C.
SCALE: DRAWN BY:
AS SHOWN MJE
R:\Projects\2025\25903000\25903004\Survey\25903004 V-SURV.dwg\V-SURVEY
DESIGNED BY: REVIEWED BY:
MJE
DATE ISSUED: PROJECT NUMBER:
08/15/25 25903004
FIELD BOOK: PAGE:
SHEET NAME:
BOUNDARY &
10 0 10 20
TOPOGRAPHIC MAP
SCALE : 1" = 10' DRAWING NUMBER:
Linear unit of measure: US Survey Foot (1 ft = 1200/3937 m)
1 of 1
UNAUTHORIZED ALTERATION OR ADDITION TO AN ARCHITECTURAL DOCUMENT BEARING A LICENSED PROFESSIONAL ARCHITECT'S SEAL IS A VIOLATION OF SECTION 8 NYCRR 69.5(b), OF THE NEW YORK STATE EDUCATION LAW. ONLY DOCUMENTS WITH THE PROFESSIONAL ARCHITECT'S SEAL ARE GENUINE TRUE AND CORRECT COPIES OF THE PROFESSIONAL ARCHITECT’S ORIGINAL WORK AND OPINION.
UNAUTHORIZED ALTERATION OR ADDITION TO A SURVEY OR ENGINEERING DOCUMENT BEARING A LICENSED LAND SURVEYOR OR PROFESSIONAL ENGINEER'S SEAL IS A VIOLATION OF SECTION 7209, SUB-DIVISION 2, OF THE NEW YORK STATE EDUCATION LAW. ONLY DOCUMENTS WITH THE LAND SURVEYOR OR PROFESSIONAL ENGINEER'S SEAL ARE GENUINE TRUE AND CORRECT COPIES OF THE LAND SURVEYOR OR PROFESSIONAL ENGINEER’S ORIGINAL WORK AND OPINION.
NOTE: DO NOT SCALE DRAWINGS FOR CONSTRUCTION.
Page 17 of 359
Page 18
SITE INFORMATION
APPLICANT:
NEW LEAF ENERGY, INC.
55 TECHNOLOGY DRIVE, SUITE #102 ,
LOWELL, MA 01851
OWNER:
W GLR HOLDINGS, LLC
180 CANAL VIEW BLVD, SUITE 600
NAD83
NAD83
E ROCHESTER, NY 14623
SITE NOTES (REV. 5/2024)
S 1. ALL CONCRETE MUST BE AIR ENTRAINED AND INCLUDE THE MINIMUM COMPRESSIVE STRENGTH OF JURISDICTIONAL
STANDARD PSI AT 28 DAYS (OR 4,000 PSI) UNLESS OTHERWISE NOTED ON THE PLANS, DETAILS AND/OR
GEOTECHNICAL REPORT. IF THERE ARE ANY DISCREPANCIES BETWEEN THE PLANS, DETAILS AND GEOTECHNICAL
REPORT THEN THE GEOTECHNICAL REPORT SHALL GOVERN.
2. THE CONTRACTOR MUST REPAIR OR REPLACE, AT THE CONTRACTOR'S SOLE COST AND EXPENSE, ALL SIDEWALKS,
CURBS, PAVEMENT MARKINGS, AND PAVEMENT DAMAGED BY CONSTRUCTION ACTIVITIES WHETHER SPECIFIED ON
THIS PLAN OR NOT.
3. CONTRACTOR IS CAUTIONED OF EXISTING UTILITY SERVICES TO REMAIN IN PROXIMITY TO PROPOSED BOLLARDS AND
SIGNS. CONTRACTOR SHALL PROVIDE FIELD MODIFICATION LOCATIONS OF BOLLARDS AND BOLLARDS WITH SIGNAGE
AS NEEDED TO AVOID CONFLICTS WITH EXISTING UTILITY SERVICES TO REMAIN.
.com
UTILITY NOTES
ROCHESTER, NY 14625
www.BohlerEngineering
(REV. 7/2024)
(585) 866-1100
70 LINDEN OAKS
1. ALL WORK ASSOCIATED WITH UTILITY POLES, OVERHEAD WIRES AND ANY/ALL APPURTENANCES SHALL BE
THIRD FLOOR
COORDINATED BY THE GC WITH THE LOCAL UTILITY COMPANIES PRIOR TO THE ORDERING OF ANY MATERIALS. THIS
MAY INCLUDE BUT IS NOT LIMITED TO THE REMOVAL, INSTALLATION, RELOCATION OR PROTECTION OF ANY BRACING,
GUY WIRES, OVERHEAD WIRES, ETC. AS MAY BE REQUIRED TO ACCOMMODATE THE PROJECT.
2. TRANSFORMERS AND SWITCH GEARS: GC SHALL PROVIDE ALL APPURTENANCES IN ACCORDANCE WITH UTILITY
COMPANY SPECIFICATIONS AND CARRY SAME IN BASE BID. APPURTENANCES SHALL INCLUDE, BUT NOT BE LIMITED
TO, THE CONCRETE PAD, SECONDARY SPILL CONTAINMENT AREAS (IF REQUIRED), BOLLARD / VEHICULAR
Phone:
PROTECTION, AND OTHER ITEMS AS MAY BE REQUIRED BY THE UTILITY PROVIDER FOR INSTALLATION OF THE
TRANSFORMER AND SWITCH GEAR (IF REQUIRED). GC SHALL COORDINATE ALL ASPECTS OF INSTALLATION WITH
UTILITY PROVIDER PRIOR TO ORDERING OF MATERIALS AND NOTIFY DESIGN ENGINEER OF ANY CONFLICTS IN
WRITING.
ORCHARD PARK ROAD
138.00'
N 80°00'37" N
3.5'
4'
4'
22.2' GREEN AREA
PROP EOP
GREEN AREA
PROP EOP
S 09°36'27" E
20'
45.00'
PROP PANEL BOARD,
PROP ASPHALT PAVEMENT (TYP)
45.00'
PROP UTILITY POLE METER, & SWITCHBOARD PROP CANTILEVERED EV
ON 7'X17.25' CONCRETE PAD CHARGING CANOPY
PROPOSED EV CHARGING STATIONS
PROP 4" PAVEMENT STRIPE
PROP 6" PROP STRIPED
PAINTED WHITE (TYP)
BOLLARD (TYP) LOADING AREA
11' 3'R
PROP GRAVEL AREA
WEST SENECA, NY 14224
705 ORCHARD PARK RD
8' 6.6'
8' 10' 10'
18'
18'
PROP 6" GREEN AREA
BOLLARD (TYP)
8'
3'
3'
3.7' 138.00'
PROP TRANSFORMER S 80°00'37" W 12.00'
ON CONCRETE PAD PROP CANOPY COLUMN (TYP) PROP DUAL PORT EV CHARGER
PROP EV CHARGING SIGN PROP EV CHARGING SIGN (TYP)
ON CONRETE PAD (TYP OF 5)
& LAST USE SIGN (TYP)
THIS PLAN TO BE UTILIZED
ALWAYS CALL 811 FOR SITE LAYOUT PURPOSES
It's fast. It's free. It's the law. ONLY
GENERAL NOTE:
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT
WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO
THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN
10 5 2.5 0
1"= 10'
10
C-2.1
WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE
ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN SITE PLAN
FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES.
Page 18 of 359
Page 19
Page 19 of 359
Page 20
Page 20 of 359
Page 21
Page 21 of 359
Page 22
Page 22 of 359
Page 23
Page 23 of 359
Page 24
Page 24 of 359
Page 25
Page 25 of 359
Page 26
Page 26 of 359
Page 27
Page 27 of 359
Page 28
Page 28 of 359
Page 29
Page 29 of 359
Page 30
Page 30 of 359
Page 31
Page 31 of 359
Page 32
April 20, 2026
Jeffery Schieber
Code Enforcement Officer
1250 Union Road – Room 210
West Seneca, New York 14224
RE: 2544 Clinton Street – Home Leasing Development
Site Plan Review Application Package
Mr. Schieber:
On behalf of Home Leasing Development, I am pleased to submit a Site Plan Review Application
Package for the proposed affordable multi-family housing project “West Seneca Apartments”,
located on one parcel at 2544 Clinton Street.
Home Leasing is seeking Site Plan Approval to develop the project on an approximately 12.7-acre
site. (TA#124.00-2-5). The project proposes the construction of 75-units spanning across two
buildings – the existing mansion on site (15-units) and a new 3-story multifamily apartment building
(60-units) with associated parking, site and drainage improvements.
The original project was approved by the Town Board for Rezoning, Special Use Permit and SEQR
Negative Declaration on 1/27/2025. The revised layout for the project was approved by the Town
Board for an Amendment to the existing Special Use Permit on 2/9/2026.
This package includes a fully engineered site package for Planning Board Review.
Per Town of West Seneca Code – Site Plan Review Criteria - “Planning Board Actions; project review
criteria” (Code Section 102-12 (A & B)), we offer the following responses:
(1) Conformance with this chapter and other adopted Town plans, an approved development
plan that includes the subject site, if one exists, and all other applicable laws;
To the best of our knowledge, the project is in compliance with all regulations of the R-50 zoning
district and supplemental multifamily housing requirements. Based on the 2016 Comprehensive
Plan – Neighborhoods – Section A, B and C – the plan supports continuing to build affordable
housing with West Seneca.
(2) Compatibility of the proposed development with the natural features of the land and the
environmental attributes of the site;
The project is designed to preserve and avoid disturbance in the environmentally sensitive areas
located on the site. There will be no disturbance within the archeological buffer area and 100-year
floodplain. All development is located in FEMA Zone X and areas of minimal flood hazard.
Development is located away from Cayuga creek to maintaining an existing natural buffer. The site
layout is designed to maintain existing trees/vegetation along Clinton Street and along the perimeter
of the parcel.
Page 32 of 359
Page 33
(3) The project's compliance with grading and drainage requirements of the Town;
The project is designed to comply with the town standards. Stormwater is designed to meet NYS
Stormwater Design Manual standards, grading and disturbance will be limited to areas as required
for installation of stormwater practices and to achieve positive drainage away from buildings/across
hardscape areas.
(4) The project's compliance with the Town's Flood Damage Prevention Law;
The project is located partially within FEMA Zone X, with the majority of the development sitting
outside of all mapped zones. Per Town Code Section 77-12 – A floodplain development permit is not
required for development within Zone X.
(5) The general layout and design of buildings, lighting, signage, open space and development
features consistent with reasonable planning principles;
The proposed singular new 3-story building (60-units) along with utilizing the existing mansion for an
additional 15-units was chosen to lessen the overall footprint on the property. The existing
landscaping and stone wall are being preserved to the greatest extent possible, providing screening
of the new building and parking lot from Clinton Street. Roads and parking lots have been designed
to meet town standards and allow for proper emergency access.
(6) The location and design of vehicular entrances/exits, including emergency access and fire
lanes, in relation to the street system, traffic circulation and control within the site, and
coordination of access points and circulation with adjoining properties;
The existing entrance to the property is being utilized with minor widening to allow for adequate
space for emergency vehicles. The parking lot and roadways are designed to meet NYS Fire Code
including: fire lanes for aerial apparatus access along two sides of building, fire turnarounds, a
looped parking lot, and two new private fire hydrants.
(7) The provision and protection of pedestrian movement on the site and coordination of
pedestrian movement on adjoining properties and the street system;
Sidewalks are provided throughout the proposed development. All sidewalks (as shown on the plans)
are ADA compliant. Sidewalk access is provided out to Clinton Street and a new segment of sidewalk
within the ROW and extends to the west to the limits of the existing guardrail, in accordance with
previous coordination with NYSDOT.
(8) The location, design, layout and adequacy of parking, loading and stacking areas, including
the provision of opportunities for handicapped parking;
The parking lot provides the code required 170 spaces – including 20 visitor spaces. The submitted
plans proposes 20-banked parking spaces to be constructed in the future if demand requires it. ADA
and EV spaces are provided at both buildings, adjacent to the accessible entrances for the
respective buildings.
(9) Provision of landscaping, screening and buffers to complement development and protect
adjacent uses and public rights-of-way from unsightliness, noise, glare and other nuisances.
Such elements shall also be used to promote the availability of green space in nonresidential
development and recreation space in residential development to avoid a continuous paved
or built environment;
2
Page 33 of 359
Page 34
The project layout was designed to preserve open space. Existing natural buffers will be maintained
along the north, east and west boundaries of the site. Trees along the south (Clinton Street) will be
maintained – other than removal required for the widening of the driveway. A patio area and
playground are provided, along with landscaped islands throughout the parking lot. Trees will be
added along the entrance drive to provide additional screening of the new development from Clinton
Street.
(10) Adequate provision of drainage and stormwater management facilities;
A Stormwater Pollution Prevention Plan (SWPPP) was prepared for the site and is included in this
submission package. The site is designed per the NYS Stormwater Design Manual standards and
NYSDEC Standards and Specifications for Erosion and Sediment Control. Several stormwater
practices are proposed for the site including bioretention areas, underground stormwater chambers
and use of a hydrodynamic separator (water quality unit).
(11) Adequacy of sewer and water facilities, fire protection and conformance with Town
regulations for the provision and construction of those services;
A full sewer report (including flow testing) has been completed. Findings of the monitoring was
reviewed and approved by Erie County Sewer, concluding that the sewer has sufficient capacity to
support the proposed project. Existing flow tests for the watermain on Clinton Street have been
reviewed and it was determined that the existing watermain has sufficient pressure to support the
proposed project. Both buildings will be designed to meet NYS Fire Code (for rehabilitation of the
existing building and new construction).
(12) Where appropriate and applicable, the concurrence of Town agencies, New York State
Department of Transportation, New York State Department of Environmental Conservation
and other county or state agencies, as appropriate; and
Correspondence with reviewing agencies will be/has been provided to the town as a part of the site
plan review. To date NYSDOT and SHPO correspondence was provided as part of SEQR review and
issuance of the Special Use Permit.
(13) Meeting the requirements for a site plan, as identified in this chapter.
This application package as submitted meets the requirements of the Town Code, to the best of our
knowledge.
Included for your consideration in the Site Plan Review are the following items:
• Site Plan Application
• Civil Plan Set
• Architectural Elevations & Rendering
• Preliminary ALTA
• Engineering Report
• SWPPP
• Check – Review Fee (mailed separately)
3
Page 34 of 359
Page 35
We look forward to presenting this project to the Planning Board on May 14th, 2026. If you have any
questions or need any additional information, please feel free to contact me at 585-770-2525 or
[email protected].
Respectfully submitted,
LaBella Associates
Shelby Vakiener, Civil Engineer
4
Page 35 of 359
Page 36
4/20/2026
West Seneca Apartments
2544 Clinton Street - Nearest cross street - Lakeside Court ( +/- 750 LF to the East)
Home Leasing - (contact - Angela Eicholtz) (248) 978-4420
45 East Avenue, 2nd Floor, Rochester, NY 14604
Clinton Street Realty Holdings
Labella Associates DPC - (contact - Shelby Vakiener) (585) 454-6110
300 Pearl Street, Suite 130, Buffalo, NY 14202
124.00-2-5
Construction of a new multifamily housing project with 75 total units. Includes a new +/- 75,900 SF building with 60 units and the re-purposing of the
existing mansion on site with 15 units. Also includes, driveway, parking, stormwater management facilities
12.7 (to creek CL) N/A
Clinton Street: +/- 205 LF of frontage
R-50 R-50
Commercial
Residential - Mutlifamily
Zoning: R75(S), R-100 A, R-100A(S), C-2, C-2(S)
Uses include: 1 Family Residential, 2 Family Residential, Residential vacant land, Residential w/ community use, warehouse, converted residential
X X
Special Use Permit - Issued by Town Board on 2/9/2026
Page 36 of 359
Page 37
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
Page 37 of 359
Page 38
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
Page 38 of 359
Page 39
SV
FUTURE
FUTURE
SV
SV
SV
SV
SV
SV
SV
SV
SV
Shelby Vakiener - agent for applicant West Seneca Apartments
2544 Clinton Street
Page 39 of 359
Page 40
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
FUTURE
Page 40 of 359
Page 41
SV
SV
SV
SV
n/a
SV
SV
SV
SV
n/a
n/a
SV
SV
SV
n/a
SV
Page 41 of 359
Page 42
SV
SV
FUTURE
SV
Page 42 of 359
Page 43
Page 43 of 359
Page 44
ISSUED FOR SITE PLAN APPROVAL
WEST SENECA APARTMENTS
2544 CLINTON ST,
WEST SENECA, NY 14224
APRIL 2026
PROJECT LOCATION
PROJECT NO: 2241067
HOME LEASING
LOCATION MAP
N.T.S.
2544 CLINTON ST, WEST SENECA, NY 14224
HOME LEASING
75 S CLINTON AVE SUITE 700,
WEST SENECA APARTMENTS
ROCHESTER, NEW YORK 14604
PROJECT NO: 2241067
APRIL 2026
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
Page 44 of 359
Page 45
NOT FOR CONSTRUCTION
GENERAL NOTES UTILITY NOTES LEGEND
1. THE CONTRACTOR ALONE SHALL BE RESPONSIBLE TO LOCATE UTILITIES OUTSIDE THE 1. CONTRACTOR SHALL COORDINATE INSTALLATION OF WATER MAIN / WATER SERVICE
RIGHT-OF-WAY INCLUDING PRIVATE ROADS. WITH ERIE COUNTY WATER AUTHORITY AND THE ERIE COUNTY HEALTH DEPARTMENT EXISTING PROPOSED DESCRIPTION EXISTING PROPOSED DESCRIPTION
(ECDOH). NO WORK SHALL BEGIN ON THE WATER MAIN / WATER SERVICE WITHOUT
2. SITE DRAINAGE, INCLUDING THE PROJECT SITE AND ADJACENT PRIVATE AND PUBLIC
ECWA AND ECDOH SIGNATURES ON THE UTILITY PLAN.
ROADWAYS, DRIVES, PARKING AREAS OR PROPERTIES SHALL BE MAINTAINED FLOODZONE END SECTION
300 Pearl Street, Suite 130
THROUGHOUT THE CONSTRUCTION PERIOD. 2. CONTRACTOR SHALL COORDINATE INSTALLATION OF SANITARY MAIN / SANITARY
SERVICE WITH ERIE COUNTY PURE WATERS (ECPW). NO WORK SHALL BEGIN ON THE ARCHAEOLOGICAL BUFFER CATCH BASIN Buffalo, NY 14202
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING ALL MATERIALS, TOOLS AND 716-551-6281
SANITARY MAIN / SANITARY SERVICE WITHOUT ECPW SIGNATURE ON THE UTILITY PLAN.
EQUIPMENT, INCLUDING SPECIAL CUTTING DEVICES, NECESSARY TO PERFORM THE TREE REMOVAL Y DRAIN BASIN
WORK CONTAINED IN THIS CONTRACT.
X X X X UTILITY REMOVAL C INLET MANHOLE
labellapc.com
4. THE SIZES AND MATERIAL OF CONSTRUCTION OF WATER MAINS, SANITARY SEWERS AND
STORM SEWERS TO REMAIN ARE REPUTED. THE CONTRACTOR SHALL VERIFY SIZES OF SAWCUT D D STORM MANHOLE
ALL UTILITIES WHERE CONNECTIONS TO SAID EXISTING UTILITIES ARE REQUIRED.
EXCAVATION TO VERIFY THESE UTILITIES SHALL BE MADE AT NO ADDITIONAL COST TO
GRADING NOTES TREE PROTECTION S SANITARY MANHOLE
THE OWNER.
1. THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS OF OSHA, AND ANY OTHER
AGENCY HAVING JURISDICTION WITH REGARD TO SAFETY PRECAUTIONS WITH CHAIN LINK FENCE S INLET DRYWELL
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING SITE AMENITIES NOT DESIGNATED FOR
REMOVAL. TRENCHING OPERATIONS. THE REQUIREMENTS SET FORTH HEREIN ARE INTENDED TO
BOARD-ON-BOARD FENCE C0
CLEAN OUT
SUPPLEMENT REQUIREMENTS ESTABLISHED BY THESE AGENCIES. IN THE CASE OF A
6. UNLESS OTHERWISE INDICATED ON THE PLANS OR DIRECTED BY THE CONFLICT BETWEEN REQUIREMENTS OF OTHER JURISDICTIONAL AGENCIES AND THESE
GUARD RAIL DS DOWN SPOUT
ARCHITECT/ENGINEER, THE CONTRACTOR IS RESPONSIBLE FOR PRESERVING AND DOCUMENTS, THE MORE STRINGENT REQUIREMENT ON THE CONTRACTOR SHALL APPLY.
PROTECTING FROM DAMAGE ALL TREES, SHRUBS AND PLANTS IN THE VICINITY OF THE
2. SHEETING, IF REQUIRED DURING CONSTRUCTION, IS CONSIDERED TO BE PART OF THIS TREE/VEGETATION LIMIT HYDRANT
PROPOSED WORK.
CONTRACT AND SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
7. THE CONTRACTOR SHALL PROTECT AND SUPPORT ALL EXISTING UTILITIES DESIGNATED BLDG BUILDING/STRUCTURE VALVE
TO REMAIN FOR THE DURATION OF THE CONTRACT. 3. ALL TRENCHES THROUGH PAVEMENT SHALL BE SAW CUT PRIOR TO EXCAVATION AND
AGAIN PRIOR TO PAVEMENT RESTORATION. PROPERTY LINE FLOW ARROW
8. ANY SITE AMENITY, UTILITY, STREET APPURTENANCE, OR OTHER ITEM WHICH BECOMES EXP: EXP:
DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR 4. CONTRACTOR SHALL ADJUST THE RIMS OF ALL MANHOLES, CATCH BASINS, VALVE EASEMENTS TELEPHONE LINE
REPLACED IN-KIND BY THE CONTRACTOR AS DETERMINED BY THE PROJECT MANAGER BOXES AND OTHER UTILITY SITE STRUCTURES TO MEET FINISHED GRADE IN AREAS
OR ARCHITECT/ENGINEER AND AT NO ADDITIONAL COST TO THE OWNER. REQUIRING REPAVING OR REGRADING AS PART OF THE WORK, INCLUDING THOSE THAT RIGHT-OF-WAY OVERHEAD ELECTRIC CERTIFICATE OF AUTHORIZATION NUMBER:
MAY NOT BE SHOWN ON THE PLANS. PROFESSIONAL ENGINEERING: 0021272
RETAINING WALL UE UE UNDERGROUND ELECTRIC LAND SURVEYING: 0021271
5. VOIDS LEFT BY UTILITY OR STRUCTURE REMOVAL OR GRUBBING OPERATIONS SHALL BE
GEOLOGICAL: 0021659
BACKFILLED AND PROPERLY COMPACTED WITH STRUCTURAL FILL (NYSDOT ITEM 304.12) BOLLARD GAS LINE
SURVEY NOTES IN AREAS UNDER AND WITHIN 5 FEET HORIZONTALLY OF ALL STRUCTURES, BUILDINGS
AND PAVEMENTS. IN GRASSED AREAS, VOIDS LEFT SHALL BE FILLED AND PROPERLY FLAG
FLAG POLE
POLE SA SANITARY LINE
COMPACTED WITH SUITABLE ON-SITE OR IMPORTED EARTHEN BACKFILL. ALL It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO
DISTURBED AREAS SHALL BE RESTORED. SIGN ST STORM LINE Sec. 7307, for any person, unless acting under the direction of a licensed
ALLOWANCE WILL BE MADE FOR ADDITIONAL COSTS DUE TO CONTRACTOR'S FAILURE TO
architect, professional engineer, or land surveyor, to alter an item in any
VERIFY EXISTING CONDITIONS. 6. THE CONTRACTOR SHALL DEWATER ALL EXCAVATIONS TO PREVENT THE INTRODUCTION DECIDUOUS TREE UD UD UD STORM UNDERDRAIN PIPE way. If an item bearing the seal of an architect, engineer, or land surveyor
OF GROUNDWATER INTO THE TRENCHES/EXCAVATIONS. PROVIDE ALL EQUIPMENT is altered; the altering architect, engineer, or land surveyor shall affix to
2. THE CONTRACTOR SHALL LOCATE, MARK, SAFEGUARD AND PRESERVE ALL SURVEY
NECESSARY TO MAINTAIN THE GROUNDWATER LEVEL AS NECESSARY. CONIFEROUS TREE the item their seal and notation "altered by" followed by their signature and
MARKERS AND RIGHT-OF-WAY MARKERS IN THE AREA OF CONSTRUCTION. FS WATER FIRE SERVICE LINE
7. THE CONTRACTOR SHALL PLACE AT MINIMUM 6 INCHES OF CLEANED SCREENED date of such alteration, and a specific description of the alteration.
3. ANY IRON PINS, MONUMENTS OR OTHER ITEMS DEFINING PROPERTY LINES WHICH ARE TREE STUMP W WATER LINE
TOPSOIL IN ALL DISTURBED AREAS PRIOR TO SEEDING.
DISTURBED BY CONSTRUCTION OPERATIONS SHALL BE PROPERLY TIED AND
ACCURATELY RESET BY A NYS LICENSED SURVEYOR UPON COMPLETION OF THE WORK. OUTLET PROTECTION 510 MAJOR CONTOUR © 2024
2026 LaBella Associates
4. HORIZONTAL DATUM BASED OFF NAD83. BIORETENTION 509 MINOR CONTOUR
5. VERTICAL BASED OFF OF NAVD88.
EROSION AND SEDIMENT CONTROL NOTES BOLLARD LIGHT POLE ℄ OF DRAINAGE SWALE
LIGHT POLE
1. ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH NEW YORK EROSION FENCE
DEMOLITION NOTES STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL, AND LOCAL
GOVERNING SOIL AND WATER CONSERVATION AGENCY RECOMMENDATIONS AND
SINGLE
LIGHT POLE DOUBLE FLOW/SLOPE DIRECTION
HOME LEASING
STANDARDS. CONTRACTOR SHALL SUBMIT PROPOSED EROSION CONTROL PLAN 75 S CLINTON AVE SUITE 700,
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO UTILITY POLE
INCLUDING SEQUENCING OF WORK TO THE ENGINEER FOR REVIEW PRIOR TO START OF SILT SOCK INLET PROTECTION ROCHESTER, NEW YORK 14604
ALLOWANCE WILL BE MADE FOR ADDITIONAL COSTS DUE TO CONTRACTOR'S FAILURE TO
WORK.
VERIFY EXISTING CONDITIONS AND DIMENSIONS. HH HANDHOLE SILT FENCE INLET PROTECTION
2. UTILIZE CONSTRUCTION METHODS/TECHNIQUES, WHICH WILL LIMIT THE EXPOSED
2. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY DIG SAFE
EARTHEN AREAS AND MINIMIZE THE EFFECT OF EARTH DISTURBANCE ACTIVITIES ON SOIL E MANHOLE CHECK DAM
NEW YORK AT 811 TO REQUEST UTILITY STAKEOUT OF ALL PUBLIC UTILITIES.
EROSION. THE AREA OF DISTURBANCE SHALL BE LIMITED TO A MAXIMUM OF 5 ACRES
3. WORK ASSOCIATED WITH THIS CONTRACT WILL OCCUR AT AN ACTIVE AND FUNCTIONAL UNLESS OTHERWISE APPROVED BY THE ENGINEER.
FACILITY. CONTRACTOR SHALL COORDINATE WITH THE OWNER TO MINIMIZE DISRUPTION
3. ALL SEDIMENTATION BARRIERS AND OTHER TEMPORARY OR PERMANENT MEASURES STABILIZED CONSTRUCTION ENTRANCE
TO THE OPERATIONS OF THE FACILITY. CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO
SHALL BE IN PLACE PRIOR TO THE START OF CONSTRUCTION. PLANS SHOW THE
PROVIDE A SAFE WORK SITE AND TO PROTECT THE PUBLIC, VISITORS AND EMPLOYEES
SUGGESTED MINIMUM MEASURES REQUIRED.
FROM HARM AS A RESULT OF HIS CONSTRUCTION ACTIVITIES.
4. REMOVAL OF ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES
4. THE HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING ABOVE GROUND AND
SHALL BE COMPLETED AT THE APPROVAL OF THE OWNER AND ENGINEER. THE COST OF
BELOW GROUND UTILITIES, STRUCTURES, AND APPURTENANCES SHOWN ON THE PLANS
REMOVING THESE MEASURES SHALL ALSO BE INCLUDED IN THE BID PRICE.
ARE APPROXIMATE AND ARE NOT GUARANTEED. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DETERMINING THE EXACT HORIZONTAL AND VERTICAL LOCATION OF 5. FOR THE DURATION OF THE PROJECT, THE CONTRACTOR SHALL PROTECT ALL ON-SITE,
ALL UTILITIES, STRUCTURES, AND APPURTENANCES IN THE PATH OF AND ADJACENT TO ADJACENT AND/OR DOWNSTREAM STORM/SANITARY SEWERS, AND/OR OTHER WATER
THE PROPOSED WORK. COURSES FROM CONTAMINATION BY WATER BORNE SILTS, SEDIMENTS, FUELS,
SOLVENTS, LUBRICANTS OR OTHER POLLUTANTS ORIGINATING FROM ANY WORK DONE
5. SITE DRAINAGE, INCLUDING THE PROJECT SITE AND ADJACENT PRIVATE AND PUBLIC
ON, OR IN SUPPORT OF THIS PROJECT.
ROADWAYS, DRIVES, PARKING AREAS OR PROPERTIES SHALL BE MAINTAINED
THROUGHOUT THE CONSTRUCTION PERIOD. 6. DURING CONSTRUCTION NO WET OR FRESH CONCRETE OR LEACHATE SHALL BE
ALLOWED TO ESCAPE INTO STORM/SANITARY SEWERS, DITCHES OR OTHER WATERS OF
6. CONTRACTOR SHALL PROTECT AND SUPPORT ALL EXISTING UTILITIES DESIGNATED TO
REMAIN FOR THE DURATION OF THE CONTRACT.
NEW YORK STATE, NOR SHALL WASHINGS FROM CONCRETE TRUCKS, MIXERS OR OTHER
DEVICES BE ALLOWED TO ENTER ANY STORM/SANITARY SEWERS, DITCHES, RIVERS, OR
DRAWING INDEX
7. THE CONTRACTOR SHALL NOTIFY THE LOCAL GOVERNMENT, LOCAL FIRE DEPARTMENT WATER COURSES.
AND THE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION (NYSDEC)
7. ALL EXCAVATED OR IMPORTED EARTHEN STOCKPILES SHALL BE SUITABLY STABILIZED
C001 GENERAL NOTES, LEGEND, AND DRAWING INDEX
AS NECESSARY AND SHALL OBTAIN ANY REQUIRED PERMITS PRIOR TO BEGINNING
WORK. COPIES OF ANY REQUIRED PERMITS SHALL BE PROVIDED TO THE OWNER PRIOR
AND PROTECTED BY SILT FENCE SO THAT IT CANNOT REASONABLY ENTER ANY WATER WEST SENECA APARTMENTS
BODY, OR STORM OR SANITARY SEWER.
TO BEGINNING THE WORK. C003 TOTAL LAND HOLDINGS 2544 CLINTON ST,
8. ALL METHODS AND EQUIPMENT PROPOSED BY THE CONTRACTOR TO ACCOMPLISH THE WEST SENECA, NY 14224
8. CONTRACTOR SHALL REMOVE FROM SITE, MATERIALS NOT INDICATED TO BE SALVAGED
WORK FOR EROSION AND POLLUTION CONTROL SHALL BE SUBJECT TO APPROVAL OF
INCLUDING ALL DEBRIS. ALL REMOVED MATERIALS SHALL BECOME THE PROPERTY OF
THE ENGINEER. C101 EXISTING CONDITIONS AND DEMOLITION PLAN
CONTRACTOR WHO SHALL LEGALLY DISPOSE OF SAME.
9. THE CONTRACTOR SHALL BE REQUIRED TO TREAT TRAVELED AREAS TO CONTROL DUST.
9. ALL TREES, SHRUBS AND PLANTS DESIGNATED TO REMAIN AND DISTURBED BY
CONSTRUCTION OPERATIONS, SHALL BE REPLACED IN-KIND AS DIRECTED BY THE
WATER SHALL BE APPLIED TO SUCH TRAVELED AREAS AS THE ARCHITECT/ENGINEER OR C102 EXISTING CONDITIONS AND DEMOLITION PLAN
OWNER'S DESIGNATED REPRESENTATIVE MAY DESIGNATE. THE NUMBER OF
ARCHITECT/ENGINEER AND/OR OWNER'S DESIGNATED REPRESENTATIVE AT NO
APPLICATIONS AND THE AMOUNT OF WATER SHALL BE BASED UPON FIELD AND
ADDITIONAL COST TO THE OWNER.
WEATHER CONDITIONS. C200 OVERALL SITE PLAN
10. THE CONTRACTOR SHALL MAINTAIN SAFE VEHICULAR AND PEDESTRIAN ACCESS TO THE
10. ALL AREAS OF SOIL DISTURBANCE RESULTING FROM THIS PROJECT WHICH WILL NOT BE
EXISTING BUILDINGS FOR THE DURATION OF THE CONTRACT.
SUBJECT TO FURTHER EARTHWORK OR CONSTRUCTION ACTIVITIES SHALL BE
11. WHEN EXISTING CONSTRUCTION WHICH IS TO REMAIN IS DAMAGED DURING THE PERMANENTLY SEEDED TO ESTABLISH GRASS, AND MULCHED WITH HAY OR STRAW C201 SITE PLAN
COURSE OF CONSTRUCTION AS A RESULT OF CONTRACTORS WORK, IT SHALL BE WITHIN ONE WEEK OF FINAL DISTURBANCE. MULCH SHALL BE MAINTAINED UNTIL A
REPAIRED AND/OR REPLACED WITH SIMILAR OR LIKE MATERIALS AS MUCH AS POSSIBLE, SUITABLE VEGETATIVE COVER IS ESTABLISHED. NO: DATE: DESCRIPTION:
AT NO COST TO THE OWNER. ALL REPAIRS AND/OR REPLACEMENTS WILL BE SUBJECT TO
C202 SITE PLAN
11. CONTRACTOR STAGING AREAS AND CONSTRUCTION ENTRANCE LOCATIONS SHALL BE Revisions
OWNERS APPROVAL.
COORDINATED WITH THE OWNER PRIOR TO START OF CONSTRUCTION. STABILIZED
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C001 GENERAL NOTES.dwg
12. COORDINATE LOCATION OF TEMPORARY CONSTRUCTION FENCE AND TEMPORARY STONE CONSTRUCTION ENTRANCE(S), AS SHOWN ON THE PLANS SHALL BE PROVIDED. ALL C203 FIRE TRUCK AND SITE EMERGENCY ACCESS PLAN
STAGING AREA WITH OWNER DISTURBED AREAS SHALL BE RESTORED. PROJECT NUMBER:
2241067
12. ALL CATCH BASINS/DRAINAGE INLETS SHALL HAVE STONED INLET PROTECTION AROUND C301 UTILITY PLAN
SITE NOTES THEM AND GEOTEXTILE FABRIC OVER THE GRATE TO PREVENT SEDIMENTATION FROM
ENTERING THE STORM SYSTEM.
DRAWN BY:
EMM / SCB
1. WELL COMPACTED SUBGRADE SHALL BE UTILIZED UNDERNEATH CONSTRUCTION OF 13. TILL ALL COMPACTED SOILS LOCATED IN LAWN AREAS TO RESTORE THE ORIGINAL C302 UTILITY PLAN REVIEWED BY:
PAVEMENT AND CONCRETE BASES. PROPERTIES OF THE SOIL PRIOR TO SEEDING. SRV / DPB
2. ALL STAKEOUT FOR THE PROPOSED SITE IMPROVEMENTS SHALL BE COMPLETED BY A
C401 GRADING, EROSION, AND SEDIMENT CONTROL PLAN ISSUED FOR:
NEW YORK STATE LICENSED LAND SURVEYOR. SITE PLAN APPROVAL
3. IF ANY DISCREPANCIES ARE NOTED BETWEEN THESE CONSTRUCTION DOCUMENTS AND
INFORMATION PROVIDED OR AN ERROR IS SUSPECT, IT SHALL BE IMMEDIATELY C402 GRADING, EROSION, AND SEDIMENT CONTROL PLAN DATE:
REPORTED TO THE CONSTRUCTION MANAGER AND LABELLA ASSOCIATES PROJECT 4/20/2026
MANAGER IN WRITING.
C501 CONSTRUCTION DETAILS DRAWING NAME:
4. ANY PROOF-ROLLING OF EXPOSED SUBBASE BY A MINIMUM 10 TON SMOOTH DRUM
ROLLER SHALL BE DONE UNDER THE GUIDANCE OF, AND OBSERVED BY, QUALIFIED
ENGINEERING PERSONNEL PRIOR TO PLACEMENT OF SUBBASE MATERIAL. THE ROLLER C502 CONSTRUCTION DETAILS
SHOULD BE OPERATED IN THE STATIC MODE AND COMPLETE AT LEAST TWO (2) PASSES
OVER THE EXPOSED SUBGRADES.
5. EXISTING WETLANDS DELINEATED BY XXXX ON XX/XX/XXXX.
C503 CONSTRUCTION DETAILS GENERAL NOTES, LEGEND,
6. PARCEL LINES AS SHOWN BY XXXX COUNTY GIS DATABASE, FOR THE TOWN OF XXXX.
C504 CONSTRUCTION DETAILS AND DRAWING INDEX
C505 CONSTRUCTION DETAILS
C506 CONSTRUCTION DETAILS
DRAWING NUMBER:
C507 CONSTRUCTION DETAILS
4/20/2026 1:17:05 PM
C508 CONSTRUCTION DETAILS
L501 LANDSCAPE DETAILS
C001
Page 45 of 359
Page 46
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
C0
D
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SEE SHEETS:
© 2024
2026 LaBella Associates
C101
C201
HOME LEASING
C301 75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
C401
PROPOSED
3-STORY C0
BUILDING C0
± 25,000 SF FOOTPRINT
C0
C0
C0
S
C0
D D
C0 D D
SEE SHEETS:
C0
DS
C102 WEST SENECA APARTMENTS
C202 2544 CLINTON ST,
WEST SENECA, NY 14224
DS
C302
C0
C402
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C003 OVERALL SITE PLAN.dwg
D
15.7'
NO: DATE: DESCRIPTION:
Revisions
C0
PROJECT NUMBER:
2241067
D
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
TOTAL LAND HOLDINGS
N
1 TOTAL LAND HOLDINGS 0' 60' 120' 180'
C003 SCALE: 1" = 60'
DRAWING NUMBER:
4/20/2026 1:17:07 PM
C003
Page 46 of 359
Page 47
DEMOLITION KEY NOTES
NOT FOR CONSTRUCTION
1 REMOVE AND DISPOSE OF ASPHALT PAVEMENT SECTION, FULL DEPTH
REMOVE AND DISPOSE OF BUILDING, STRUCTURES, AND FOUNDATIONS
2 (REFER TO ARCHITECTURAL DRAWINGS AND SOIL MANAGEMENT PLAN
(SMP) FOR WORK WITHIN ARCHAEOLOGICAL BUFFER AREA)
3 REMOVE AND DISPOSE OF CONCRETE SIDEWALK SECTION, FULL DEPTH 300 Pearl Street, Suite 130
Buffalo, NY 14202
4 FULL DEPTH SAWCUT
716-551-6281
5 REMOVE AND DISPOSE OF TREE AND STUMP labellapc.com
6 REMOVE AND DISPOSE OF STUMP 15
REMOVE EXISTING UNDERGROUND UTILITY. EXACT EXTENTS OF UTILITY
7 X X
REMOVAL TO BE DETERMINED IN FIELD.
8 REMOVE EXISTING UTILITY STRUCTURE
9 REMOVE AND DISPOSE OF MOUNTED BUILDING LIGHTS(TYP.)
2
10 REMOVE AND DISPOSE OF MAILBOX
REMOVE AND PROTECT PORTION OF EXISTING STONE WALL FOR
11
REINSTALLATION
12 REMOVE AND DISPOSE OF GATE EXP: EXP:
13 PROTECT EXISTING TREE
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
14 PROTECT EXISTING UTILITY
LAND SURVEYING: 0021271
PROTECT EXISTING FENCE. FENCE TO BE EVALUATED BY OWNER. SECTIONS GEOLOGICAL: 0021659
15
TO BE REPLACED AS DETERMINED BY OWNER.
16 REMOVE AND DISPOSE OF EXISTING FLAG POLE AND FOUNDATION It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
17 REMOVE AND DISPOSE OF EXISTING SIGN architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
18 REMOVE AND DISPOSE OF EXISTING HVAC UNITS
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
19 PROTECT EXISTING STONE WALL
© 2024
2026 LaBella Associates
DEMOLITION PLAN NOTE:
1. ALL STUMPS AND BRUSH MAY NOT BE BURIED IN THE TOWN AND TOPSOIL MAY NOT
BE REMOVED FROM THE WORK SITE WITHOUT A PERMIT.
6
2
HOME LEASING
15
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
X
1
X
X
X
X
X
7
X
X
X
X
X
X
X
X
7
X
X
5
X
X
X
X
X
WEST SENECA APARTMENTS
X
X
X
2544 CLINTON ST,
X
X
8
WEST SENECA, NY 14224
X
X
2
X
5
3
15
1 NO: DATE: DESCRIPTION:
Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C100 DEMO PLAN.dwg
PROJECT NUMBER:
2241067
15 DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
1
DRAWING NAME:
EXISTING CONDITIONS AND
DEMOLITION PLAN
MATCH TO SHEET: C102
6
17
DRAWING NUMBER:
4/20/2026 1:17:39 PM
N
1 EXISTING CONDITIONS AND DEMOLITION PLAN 0' 20' 40' 60'
C101 SCALE: 1" = 20'
C101
Page 47 of 359
Page 48
NOT FOR CONSTRUCTION
MATCH TO SHEET: C101
6
300 Pearl Street, Suite 130
17 Buffalo, NY 14202
716-551-6281
labellapc.com
6
DS
3
15
5
1
3
3
18
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
DS PROFESSIONAL ENGINEERING: 0021272
9
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
9 way. If an item bearing the seal of an architect, engineer, or land surveyor
3 7
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
X
10
3
X
© 2024
2026 LaBella Associates
X
X
X
X
X
HOME LEASING
T
X
1
75 S CLINTON AVE SUITE 700,
X
X
ROCHESTER, NEW YORK 14604
X
X
X
X
X
X 7
X
X
X
X
X
T
X
X
X
X
X
X
X
X
8
T
9
FLAG
POLE 15
15
WEST SENECA APARTMENTS
T
2544 CLINTON ST,
WEST SENECA, NY 14224
DEMOLITION KEY NOTES
T
1 REMOVE AND DISPOSE OF ASPHALT PAVEMENT SECTION, FULL DEPTH
REMOVE AND DISPOSE OF BUILDING, STRUCTURES, AND FOUNDATIONS
2 (REFER TO ARCHITECTURAL DRAWINGS AND SOIL MANAGEMENT PLAN
(SMP) FOR WORK WITHIN ARCHAEOLOGICAL BUFFER AREA)
3 REMOVE AND DISPOSE OF CONCRETE SIDEWALK SECTION, FULL DEPTH
4 FULL DEPTH SAWCUT 11 12
T
11 NO: DATE: DESCRIPTION:
Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C100 DEMO PLAN.dwg
5 REMOVE AND DISPOSE OF TREE AND STUMP
11 19 14
19 11
6 REMOVE AND DISPOSE OF STUMP PROJECT NUMBER:
REMOVE EXISTING UNDERGROUND UTILITY. EXACT EXTENTS OF UTILITY
2241067
14 ±18'
7 X X
REMOVAL TO BE DETERMINED IN FIELD. ±21'
19 DRAWN BY:
8 REMOVE EXISTING UTILITY STRUCTURE EMM / SCB
19
REVIEWED BY:
SRV / DPB
9 REMOVE AND DISPOSE OF MOUNTED BUILDING LIGHTS(TYP.) ±85'
4 ISSUED FOR:
10 REMOVE AND DISPOSE OF MAILBOX SITE PLAN APPROVAL
REMOVE AND PROTECT PORTION OF EXISTING STONE WALL FOR DATE:
11
REINSTALLATION 4/20/2026
12 REMOVE AND DISPOSE OF GATE DRAWING NAME:
13 PROTECT EXISTING TREE
14 PROTECT EXISTING UTILITY
15
PROTECT EXISTING FENCE. FENCE TO BE EVALUATED BY OWNER. SECTIONS
TO BE REPLACED AS DETERMINED BY OWNER.
EXISTING CONDITIONS AND
16 REMOVE AND DISPOSE OF EXISTING FLAG POLE AND FOUNDATION DEMOLITION PLAN
17 REMOVE AND DISPOSE OF EXISTING SIGN
18 REMOVE AND DISPOSE OF EXISTING HVAC UNITS
DRAWING NUMBER:
19 PROTECT EXISTING STONE WALL
DEMOLITION PLAN NOTE:
4/20/2026 1:17:13 PM
1. ALL STUMPS AND BRUSH MAY NOT BE BURIED IN THE TOWN AND TOPSOIL MAY NOT N
BE REMOVED FROM THE WORK SITE WITHOUT A PERMIT.
1 EXISTING CONDITIONS AND DEMOLITION PLAN 0' 20' 40' 60'
C102 SCALE: 1" = 20'
C102
Page 48 of 359
Page 49
NOT FOR CONSTRUCTION
C201
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
C0
D
labellapc.com
±103'
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
PROPOSED architect, professional engineer, or land surveyor, to alter an item in any
3-STORY C0
way. If an item bearing the seal of an architect, engineer, or land surveyor
BUILDING is altered; the altering architect, engineer, or land surveyor shall affix to
C0
the item their seal and notation "altered by" followed by their signature and
± 25,000 SF FOOTPRINT date of such alteration, and a specific description of the alteration.
±103'
C0
© 2024
2026 LaBella Associates
C0
C0
S
C0
HOME LEASING
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
D D
C0 D D
C202 C0
DS
±445'
DS
25-FT SIDE SETBACK
WEST SENECA APARTMENTS
C0
2544 CLINTON ST,
WEST SENECA, NY 14224
PROJECT DATA
PARCEL INFORMATION
APPLICANT HOME LEASING
PARCEL ADDRESS 2544 CLINTON STREET
SLB # 124.00-2-5
D PARCEL AREA (TOTAL) 12.7 ACRES
15.7'
TOTAL PROJECT AREA ±7.0 ACRES
EXISTING IMPERVIOUS NO: DATE: DESCRIPTION:
1.06 ACRES
WITHIN PROJECT AREA Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C200 SITE PLAN.dwg
C0
PROPOSED IMPERVIOUS
2.98 ACRES
WITHIN PROJECT AREA
PROJECT NUMBER:
TOTAL DISTURBANCE AREA ±5.7 ACRES
2241067
ZONING INFORMATION
DRAWN BY:
REQUIRED PROPOSED EMM / SCB
D CLASSIFICATION R-50 R-50 REVIEWED BY:
SRV / DPB
FRONT SETBACK 30 FT ±445 FT
ISSUED FOR:
30-FT FRONT SETBACK SIDE SETBACK 25-FT* ±103 FT
SITE PLAN APPROVAL
REAR SETBACK 40-FT** ±255 FT
DATE:
OPEN SPACE - 8.5 ACRES
4/20/2026
MAX BUILDING HEIGHT 40 FT ±37 FT
DRAWING NAME:
TOTAL APARTMENT UNITS 75
PARKING INFORMATION
REQUIRED PROPOSED
170 (INCLUDING 20
PARKING SPACES 170
BANKED SPACES)
*OR A DISTANCE EQUAL TO THE HEIGHT OF PRINCIPAL BUILDING, WHICHEVER IS
OVERALL SITE PLAN
GREATER.
**FOR MULTIFAMILY DWELLINGS, EACH SIDE YARD SHALL BE 25 FEET OR A
DISTANCE EQUAL TO ONE-HALF (1/2) THE HEIGHT OF SUCH BUILDING, WHICHEVER
IS GREATER. THE TOTAL OF THE TWO SIDE YARDS SHALL BE TWICE THAT REQUIRED
FOR ONE SIDE YARD. THE TOWN BOARD SHALL HAVE THE POWER TO REDUCE SAID
SIDE YARD REQUIREMENTS UPON SHOWING OF SPECIAL CIRCUMSTANCES OR
HARDSHIP.
***MULTIFAMILY DEVELOPMENTS REQUIRE VISITOR PARKING. BASED ON UNIT DRAWING NUMBER:
COUNT (74), 20 VISITOR SPACES ARE REQUIRED FOR THIS COMMUNITY.
4/20/2026 1:17:19 PM
N
1 OVERALL SITE PLAN 0' 40' 80' 120'
C200 SCALE: 1" = 40'
C200
Page 49 of 359
Page 50
NOT FOR CONSTRUCTION
SITE KEY NOTES
SIGN SUMMARY
1 NEW STANDARD DUTY ASPHALT PAVEMENT NUMBER NAME IMAGE SIZE MUTCD NUMBER QUANTITY
COLORS
NEW YORK STATE
2 NEW CONCRETE SIDEWALK BLACK LETTERING ON
1b 'HANDICAP' 12" x 18" SYMBOL 6
WHITE BACKGROUND
S:\MFriedle\blueicon.jpg
3 NEW CONCRETE DUMPSTER PAD, SEE DETAIL STANDARD 30' 300 Pearl Street, Suite 130
20'
NO PARKING NO
PARKING RED LETTERING ON Buffalo, NY 14202
4 NEW CONCRETE PAD FOR TRASH COLLECTION 2b ANY 12" x 18" R7-1 3 716-551-6281
SIGN TIME WHITE BACKGROUND
5 NEW CONCRETE GENERATOR/TRANSFORMER PAD, SEE DETAIL labellapc.com
RED SIGN WITH WHITE 29 R2
6 NEW PATIO AREA 3 STOP SIGN 30" x 30" R1-1 4 8'
LETTERING
C0
D
7 NEW CONCRETE CURB
ELECTRIC BLACK LETTERING ON 66'
8 NEW FLUSH CONCRETE CURB
4 EV PARKING VEHICLE 12" x 18" 8
PARKING
ONLY WHILE
CHARGING
WHITE BACKGROUND
9 NEW CURB TRANSITION 31
24'
10a NEW TYPE A CONCRETE ACCESS RAMP
10b NEW TYPE B CONCRETE ACCESS RAMP 4
8'
5'
EXP: EXP:
R2
10c NEW TYPE C CONCRETE ACCESS RAMP
14'
26'
10d NEW TYPE D CONCRETE ACCESS RAMP 30
CERTIFICATE OF AUTHORIZATION NUMBER:
2
25 28 PROFESSIONAL ENGINEERING: 0021272
11 NEW DETECTABLE WARNING SYSTEM 9 LAND SURVEYING: 0021271
7
GEOLOGICAL: 0021659
12 NEW PLAYGROUND AREA, WITH POURED IN PLACE PLAY SURFACING
20
13 NEW 4-FT CHAIN LINK FENCE (CLF) 9 25 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
12
architect, professional engineer, or land surveyor, to alter an item in any
14 NEW YELLOW PAVEMENT MARKINGS (TYP.)
13 way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
15 NEW CROSSWALK the item their seal and notation "altered by" followed by their signature and
14 date of such alteration, and a specific description of the alteration.
16 NEW ADA PARKING SYMBOL (TYP.)
© 2024
2026 LaBella Associates
17 NEW ADA PARKING STRIPING (TYP.)
20
18 NEW DUAL EV CHARGING UNIT (TYP.)
2 5
19 NEW EV PARKING SYMBOL AND SIGNAGE (TYP.)
20 NEW 4-FT CLF SWING GATE
HOME LEASING
28 75 S CLINTON AVE SUITE 700,
21
BANKED PARKING - FUTURE PAVED PARKING (TO BE CONSTRUCTED ROCHESTER, NEW YORK 14604
IF DEMAND INCREASES) 7
18'
22 RECONSTRUCT STONE WALL WITH SALVAGED MATERIALS 7
28.5'
23 NEW DETECTABLE WARNING SYSTEM
1
24 NEW STOP BAR
18' TYP. 30' 18' TYP.
25 NEW LIGHT POLE (TYP.) SEE UTILITY PLAN
26 NEW 6-FT BOARD-ON-BOARD FENCING 19
4
27 NEW 3-FT BOARD-ON-BOARD MANDOOR
28 LANDSCAPED AREA
PROPOSED 4
29
STORMWATER MANAGEMENT PRACTICE - REFER TO 300 SERIES
SHEETS FOR UTILITY DESIGN
3-STORY C0
9' TYP.
4
30 NEW SHED BUILDING 4 C0
31 NEW SNOW STORAGE AREA ± 25,000 SF FOOTPRINT 6' 7
4
WEST SENECA APARTMENTS
28 28
4 2544 CLINTON ST,
1b 2b 1b 1b 2b 1b
9 WEST SENECA, NY 14224
18
25
C0
10c 10c 10c 28
31
6'
C0
2
9 9 28
18' TYP.
7 9' TYP. 7
28 10a
C0 11
S
R2
C0
7
8'
7 9
16 17 16 17
NO: DATE: DESCRIPTION:
15 Revisions
30'
14
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C200 SITE PLAN.dwg
24
R4
0' PROJECT NUMBER:
7 9 3
7 2241067
R1
5 '
R1
5' 7 7
29 DRAWN BY:
EMM / SCB
18' TYP.
28 REVIEWED BY:
28 D
28
D
28 SRV / DPB
30' 30'
10b ISSUED FOR:
5' 21 SITE PLAN APPROVAL
18' TYP.
25 25 25 25
DATE:
4/20/2026
5'
7
R1
R1
DRAWING NAME:
5'
C0 D D
9
1 15
30'
14
24
3 17 16
21'
9
10b 3 SITE PLAN
9
MATCH TO SHEET: C202
8'
R2
18' TYP.
29'
8 9 7 7 7
26 9 28 28
19 10c 10c 2
27 10c
6'
28 DRAWING NUMBER:
C0
5'
4/20/2026 1:17:52 PM
N
1 SITE PLAN 0' 20' 40' 60'
C201 SCALE: 1" = 20'
C201
Page 50 of 359
Page 51
NOT FOR CONSTRUCTION
3 17 16 9
10b 3
9 21'
MATCH TO SHEET: C201
8'
R2
18' TYP.
29'
8 9 7 7 7
26 9 28 28 300 Pearl Street, Suite 130
19 10c 10c 2
27 10c
Buffalo, NY 14202
6'
28 716-551-6281
C0
5'
18 9 labellapc.com
4 4 1b 2b 1b 25
DS
5'
21
EXP: EXP:
2
CERTIFICATE OF AUTHORIZATION NUMBER:
DS 2 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
5'
25
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
SITE KEY NOTES Sec. 7307, for any person, unless acting under the direction of a licensed
C0 architect, professional engineer, or land surveyor, to alter an item in any
1 NEW STANDARD DUTY ASPHALT PAVEMENT R8 way. If an item bearing the seal of an architect, engineer, or land surveyor
5' 5' is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
2 NEW CONCRETE SIDEWALK
date of such alteration, and a specific description of the alteration.
29
3 NEW CONCRETE DUMPSTER PAD, SEE DETAIL
25 © 2024
2026 LaBella Associates
4 NEW CONCRETE PAD FOR TRASH COLLECTION
25 2
5 NEW CONCRETE GENERATOR/TRANSFORMER PAD, SEE DETAIL
6'
6 NEW PATIO AREA
7 HOME LEASING
18' TYP.
9' TYP. 10d
7 NEW CONCRETE CURB 10' 75 S CLINTON AVE SUITE 700,
5 9
ROCHESTER, NEW YORK 14604
8 NEW FLUSH CONCRETE CURB
10'
2 14
9
9 NEW CURB TRANSITION 9' 14 11
14
24'
D
10a NEW TYPE A CONCRETE ACCESS RAMP 24
31 3 15
10b NEW TYPE B CONCRETE ACCESS RAMP
10c NEW TYPE C CONCRETE ACCESS RAMP 11 1
25
29
10d NEW TYPE D CONCRETE ACCESS RAMP
R8
5'
10d
C0
11 NEW DETECTABLE WARNING SYSTEM
12 NEW PLAYGROUND AREA, WITH POURED IN PLACE PLAY SURFACING 9
13 NEW 4-FT CHAIN LINK FENCE (CLF)
25
14 NEW YELLOW PAVEMENT MARKINGS (TYP.)
15 NEW CROSSWALK
7
WEST SENECA APARTMENTS
16 NEW ADA PARKING SYMBOL (TYP.)
2544 CLINTON ST,
NEW ADA PARKING STRIPING (TYP.) 14 WEST SENECA, NY 14224
17
D
5' 30'
18 NEW DUAL EV CHARGING UNIT (TYP.)
19 NEW EV PARKING SYMBOL AND SIGNAGE (TYP.)
2
20 NEW 4-FT CLF SWING GATE
25
BANKED PARKING - FUTURE PAVED PARKING (TO BE CONSTRUCTED
21
IF DEMAND INCREASES)
9
22 RECONSTRUCT STONE WALL WITH SALVAGED MATERIALS 22
22 NO: DATE: DESCRIPTION:
23 NEW DETECTABLE WARNING SYSTEM Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C200 SITE PLAN.dwg
7 22
24 NEW STOP BAR 22 3 PROJECT NUMBER:
2241067
25 NEW LIGHT POLE (TYP.) SEE UTILITY PLAN 8' 9
R28 R2
' DRAWN BY:
26 NEW 6-FT BOARD-ON-BOARD FENCING 24 EMM / SCB
REVIEWED BY:
27 NEW 3-FT BOARD-ON-BOARD MANDOOR 7 SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
2' 5'
28 LANDSCAPED AREA 10b
STORMWATER MANAGEMENT PRACTICE - REFER TO 300 SERIES DATE:
29
SHEETS FOR UTILITY DESIGN 4/20/2026
30 NEW SHED 9 DRAWING NAME:
31 NEW SNOW STORAGE AREA
SIGN SUMMARY
NUMBER NAME IMAGE SIZE COLORS MUTCD NUMBER QUANTITY
NEW YORK STATE
SITE PLAN
BLACK LETTERING ON
1b 'HANDICAP' 12" x 18" SYMBOL 6
WHITE BACKGROUND
S:\MFriedle\blueicon.jpg
STANDARD
NO
NO PARKING PARKING RED LETTERING ON
2b ANY 12" x 18" R7-1 3
SIGN TIME WHITE BACKGROUND
DRAWING NUMBER:
RED SIGN WITH WHITE
3 STOP SIGN 30" x 30" R1-1 4
LETTERING
4/20/2026 1:18:01 PM
N
1 SITE PLAN 0' 20' 40' 60'
C202
ELECTRIC BLACK LETTERING ON
4 EV PARKING VEHICLE 12" x 18" 8 C202
PARKING
ONLY WHILE
CHARGING
WHITE BACKGROUND SCALE: 1" = 20'
Page 51 of 359
Page 52
NOT FOR CONSTRUCTION
WEST SENECA FIRE DEPARTMENT LADDER
TRUCK EQUIVALENT VEHICLE PATH 300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
14'
PROPOSED
HYDRANT
EXP: EXP:
HYDRANT COVERAGE
(600-LF MAX)
HYDRANT COVERAGE CERTIFICATE OF AUTHORIZATION NUMBER:
(600-LF MAX) PROFESSIONAL ENGINEERING: 0021272
28' LAND SURVEYING: 0021271
397' GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
PROPOSED architect, professional engineer, or land surveyor, to alter an item in any
3-STORY way. If an item bearing the seal of an architect, engineer, or land surveyor
HYDRANT COVERAGE BUILDING is altered; the altering architect, engineer, or land surveyor shall affix to
(600-LF MAX) the item their seal and notation "altered by" followed by their signature and
± 25,000 SF FOOTPRINT date of such alteration, and a specific description of the alteration.
ACCESSIBLE
ROUTE (TYP.)
© 2024
2026 LaBella Associates
28'
28'
396'
S
RIM=600.15 533'
HOME LEASING
75 S CLINTON AVE SUITE 700,
ACCESSIBLE
WEST SENECA FIRE DEPARTMENT LADDER ROUTE (TYP.)
ROCHESTER, NEW YORK 14604
TRUCK EQUIVALENT VEHICLE PATH
WEST SENECA FIRE DEPARTMENT LADDER
TRUCK EQUIVALENT VEHICLE PATH
HYDRANT COVERAGE
(600-LF MAX)
PROPOSED
HYDRANT
ACCESSIBLE
ROUTE (TYP.)
DS
HYDRANT COVERAGE ACCESSIBLE
(600-LF MAX) ROUTE (TYP.)
276'
276' DS
WEST SENECA APARTMENTS
2544 CLINTON ST,
HYDRANT COVERAGE
(600-LF MAX)
WEST SENECA, NY 14224
15.7'
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C203 CODE COMPLIANCE.dwg
NO: DATE: DESCRIPTION:
WEST SENECA FIRE DEPARTMENT LADDER Revisions
TRUCK EQUIVALENT VEHICLE PATH
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
E-ONE HP95 Mid Mount
47.75
FIRE TRUCK AND SITE
EMERGENCY ACCESS PLAN
7.917 18.417 4.833
20.833
E-ONE HP95 Mid Mount
Overall Length 47.750ft
Overall Width 8.333ft
Overall Body Height 11.000ft
Min Body Ground Clearance 1.393ft
Track Width 8.333ft DRAWING NUMBER:
Lock-to-lock time 6.00s
Max Wheel Angle 45.00°
4/20/2026 1:17:33 PM
N
1 FIRE TRUCK AND SITE EMERGENCY ACCESS PLAN 0' 40' 80' 120'
C203 SCALE: 1" = 40'
C203
Page 52 of 359
Page 53
NOT FOR CONSTRUCTION
75 LF 12" SICPP
ST
@ 1.00% MIN. 599
600
601
MATCH TO INSET
ST
300 Pearl Street, Suite 130
Buffalo, NY 14202
END SECTION
INV=583.66 716-551-6281
12 LF 12" SICPP @ 1.00%
599
ST
600 labellapc.com
600
599 60
1
C0
598
ST
UD UD UD UD UD UD UD UD UD UD UD UD D
598
600.14 599
600
NEW BIORETENTION 600
AREA #1 (± 350 SF) ST-4.0
599
600
ST
75 LF 12" SICPP 4' DIA. MH
ST-4.1
597
597
598
599
ST
598
RIM=600.25
599
@ 1.00% MIN. 599
600 24"x24" CB N INV=594.36
600
600
RIM=599.00 W INV=594.46
601 N INV=594.58 S INV=595.25
6" SICPP @
ST
1.00% MIN.
ST
EXP: EXP:
ST
N CERTIFICATE OF AUTHORIZATION NUMBER:
2 INSET 60
0 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
C301 SCALE: 1"=20' GEOLOGICAL: 0021659
ST
NEW PRIVATE
FIRE HYDRANT
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
FS
ST-3.4 Sec. 7307, for any person, unless acting under the direction of a licensed
ST
24"x24" CB architect, professional engineer, or land surveyor, to alter an item in any
ST
RIM=599.65 way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
S INV=597.58
the item their seal and notation "altered by" followed by their signature and
FS
date of such alteration, and a specific description of the alteration.
ST
ST
© 2024
2026 LaBella Associates
FS
600
ST
ST
NEW 6" FIRE SERVICE
600
600
(AFTER BACKFLOW
PREVENTOR)
HOME LEASING
598
FS
598
599
599
ST
75 S CLINTON AVE SUITE 700,
600
ST
ROCHESTER, NEW YORK 14604
150 LF 12"
SICPP @ 1.00%
FS
ST
600
ST
595
596
FS
597
ST
598
ST
FS
NEW BACKFLOW PREVENTOR (IN FS
ST
MECHANICAL ROOM) FOR COMBINED
ST
SERVICE. DOMESTIC SERVICE WILL BE
PROPOSED METERED AFTER THE BACKFLOW.
600
600
W
3-STORY C0
ST
BUILDING C0
W
± 25,000 SF FOOTPRINT ST-3.3
ST
24"x24" CB
RIM=599.75
FFE=600.75' 6" SICPP @ N INV=596.08 WEST SENECA APARTMENTS
599
ST
599
1.00% MIN. SW INV=596.08
2544 CLINTON ST,
W
WEST SENECA, NY 14224
595
596
597
598
NEW 6" PVC SDR-21 C0
ST ST ST ST ST ST ST ST ST ST
ST
ST
ST ST ST ST ST ST
SA
SANITARY LATERAL
600
599
600
W
SA
C0
ST
CONNECT INTO
600
600
EXISTING
SAN CO 600
ST
SANITARY MAIN SA
SA
SA TYP.
SA
C0
SA
W
60
SA
0
S SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA C0
SA SA
ST
4' DIA. SAN MH SA SA SA SA SA SA SA
SAN CO 600
RIM=600.15 NEW 6" PVC SDR-21 102 LF 12"
TYP. SAN CO
E INV=589.50 SICPP @ 1.00%
SA
SANITARY LATERAL
ST
TYP. NO: DATE: DESCRIPTION:
W INV=589.40 70 LF 6" SICPP
W
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
@ 1.00% MIN. Revisions
ST
SA
ST-3.0
PROJECT NUMBER:
ST
ST-2.0 4' DIA. MH
2241067
SA
W
4' DIA. MH RIM=599.33
RIM=599.29 N INV=593.25
599
599
ST
W INV=592.12 S INV=592.25 DRAWN BY:
600
E INV=591.25 EMM / SCB
SA
W INV=591.25
ST
30 LF 12" SICPP REVIEWED BY:
SRV / DPB
W
D D
50 5LF
99 12" SICPP @ 5.00%
SA
@ 5.00% 599
ISSUED FOR:
ST
ST-2.2 SITE PLAN APPROVAL
59
24"x24" CB
9
SA
ST-1.1
ST
ST
RIM=598.62
W
4' DIA. MH DATE:
E INV=596.12 599 ST 85 LF 12" SICPP 4/20/2026
RIM=599.08
E INV=591.25 @ 2.00%
SA
SAN CO
ST ST ST ST ST ST ST ST
TYP. W INV=591.25 35 LF 12" SICPP DRAWING NAME:
C0 D D
ST ST ST ST ST ST ST @ 3.00%
W
ST-3.2
SA
120 LF 8" SICPP ST-2.1 ST-3.1
END SECTION ST-1.0 24"x24" CB
@ 1.00% 24"x24" CB 24"x24" CB NEW 6" COMBINED
ADS STORMTECH CHAMBER RIM=598.50
INV=589.75 RIM=598.87 CONTECH CASCADE CS4 WQU RIM=598.89
599 SYSTEM SC-3500 WATER SERVICE
NE INV=595.00
SA
W INV=593.62 RIM=599.00 N INV=593.30
NE INV=593.62 E INV=591.15 (100 CHAMBERS) W INV=593.30 599 W INV=595.00
W
NEW 4" PVC SDR-21 W INV=591.15
NEW PRIVATE
INV=591.25
UTILITY PLAN
SA
SANITARY LATERAL FIRE HYDRANT
MATCH TO SHEET: C302
SA
W
FS
600
DRAWING NUMBER:
SA
W
C0
600
UTILITY PLAN NOTES:
4/20/2026 1:18:02 PM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PLAN 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C301
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C301 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 53 of 359
Page 54
599
CONTECH CASCADE CS4 WQU RIM=598.89 WATER SERVICE
SYSTEM SC-3500 NE INV=595.00
SA
W INV=593.62 RIM=599.00 N INV=593.30 24
NOT FOR CONSTRUCTION
NE INV=593.62 E INV=591.15 (100 CHAMBERS) W INV=593.30 599 W INV=595.00
W
NEW 4" PVC SDR-21 W INV=591.15 INV=591.25
NEW PRIVATE
SA
SANITARY LATERAL FIRE HYDRANT
MATCH TO SHEET: C301
SA
W
300 Pearl Street, Suite 130
FS
600 Buffalo, NY 14202
716-551-6281
SA
W
C0
SAN CO NEW 6" FIRE SERVICE 600 labellapc.com
FS
TYP. (AFTER BACKFLOW
PREVENTOR)
598
599
598
W
599
DS
599
W
W
EXP: EXP:
W
CERTIFICATE OF AUTHORIZATION NUMBER:
DS PROFESSIONAL ENGINEERING: 0021272
NEW BACKFLOW PREVENTOR LAND SURVEYING: 0021271
(IN MECHANICAL ROOM) FOR GEOLOGICAL: 0021659
W
598
COMBINED SERVICE.
597
DOMESTIC SERVICE WILL BE
597
598
599
METERED AFTER THE It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
BACKFLOW. NEW BIORETENTION Sec. 7307, for any person, unless acting under the direction of a licensed
600
AREA #2 (± 370 SF) architect, professional engineer, or land surveyor, to alter an item in any
W
C0
ST-5.2 UD
way. If an item bearing the seal of an architect, engineer, or land surveyor
24"x24" CB is altered; the altering architect, engineer, or land surveyor shall affix to
599 UD
RIM=597.00 the item their seal and notation "altered by" followed by their signature and
598 UD
W INV=592.58 UD date of such alteration, and a specific description of the alteration.
597
UD
W
596 UD
UD
132 LF 12" UD UD © 2024
2026 LaBella Associates
UD UD UD
60 SICPP @ 0.50% UD
596
W
0
ST
NEW 6" COMBINED 597
W
ST 598
WATER SERVICE
STW
W W W W W W W W W W W W W
HOME LEASING
T
ST 600
W
75 S CLINTON AVE SUITE 700,
ST-5.0 ST
ROCHESTER, NEW YORK 14604
4' DIA. MH
ST
RIM=599.08
S INV=591.30 598
59
ST
9
W
E INV=591.92
W INV=591.20 ST
59 597
T
D
ST 9
ST
ST 596
ST 28 LF 12" SICPP 6
ST 59 7
ST
W
ST @ 1.00% 59 8
ST
ST ST-5.1 59
ST
ST 9
598
ST
ST 220 LF 12" 598 24"x24" CB 59
ST SICPP @ 0.50% 597 RIM=596.00
596 N INV=591.58
W
END SECTION 595
UD UD UD
UD UD UD
INV=589.00 C0
UD UD UD UD UD UD
T
UD
UD
UD
UD
UD
595
W
NEW BIORETENTION
NEW 6" COMBINED
AREA #3 (± 700 SF)
WATER SERVICE
9
59
W
ST-6.0 596
4' DIA. MH 597
WEST SENECA APARTMENTS
T
RIM=597.50 598
E INV=590.10 2544 CLINTON ST,
598
599
597
W
596
595
595
W INV=590.00
596
597
WEST SENECA, NY 14224
598
599
ST ST ST ST ST D ST ST ST ST ST ST ST ST ST ST
ST ST ST ST ST
175 LF 12" 175 LF 12"
W
END SECTION ST-6.1
T
SICPP @ 1.00% SICPP @ 1.00%
INV=5#.## 36"x36" CB
RIM=594.35
598
W INV=591.85
W
T
NO: DATE: DESCRIPTION:
CONNECT TO EXISTING 6"
W
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
WATERMAIN WITH TS&V Revisions
PROJECT NUMBER:
2241067
W
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
UTILITY PLAN
DRAWING NUMBER:
UTILITY PLAN NOTES:
4/20/2026 1:17:32 PM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PLAN 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C302
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C302 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 54 of 359
Page 55
NOT FOR CONSTRUCTION
599
600
601
601.17
601.62
300 Pearl Street, Suite 130
Buffalo, NY 14202
594.92
716-551-6281
601.26
599
600 600.87
labellapc.com
600
599 60
1
C0
598
UD UD UD UD UD UD UD UD UD UD UD UD D
598
599
600
600 600.54 600.90
INSTALL AND MAINTAIN
599
600
TEMPORARY SILT SOCK
597
597
598
599
600.10
598
599
600.18
600
600
600.54 600.54 600.72
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
60
0 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
600.39 TC 600.84 TC
599.89 BC 600.34 BC It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2024
2026 LaBella Associates
600
600
600
HOME LEASING
598
598
599
599
75 S CLINTON AVE SUITE 700,
600
ROCHESTER, NEW YORK 14604
600
595 600.78 TC
596 600.28 BC 601.23 TC
597 600.73 BC
598
PROPOSED
600
600
3-STORY C0
BUILDING C0
± 25,000 SF FOOTPRINT
FFE=600.75' WEST SENECA APARTMENTS
599
599
600.92 TC
600.42 BC
2544 CLINTON ST,
600.91 TC
WEST SENECA, NY 14224
595
600.41 BC
596
597
598
600.14
C0
600
599
600
C0
600.38 TC 600.67 TC 600.68 TC 600.79 TC
600.11 600 600.50 TC
599.09 HP
600
599.88 BC 600.17 BC 600.18 BC 600.29 BC 600.00 BC
600 600.63 TC 600.63 TC
C0
600.27 600.13 BC 600.13 BC
60
600.63 TC
0
S
C0
600.13 BC
600
RIM=600.15
600.04 599.87
NO: DATE: DESCRIPTION:
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C400 GRADING PLAN.dwg
Revisions
599.92 TC 600.13 TC 599.91 TC 599.59 TC PROJECT NUMBER:
599.42 BC 599.63 BC 599.41 BC 599.09 BC 2241067
599
599
599.49 TC DRAWN BY:
600
598.99 BC EMM / SCB
REVIEWED BY:
599 D D SRV / DPB
599
ISSUED FOR:
SITE PLAN APPROVAL
59
9
DATE:
599 598.89 4/20/2026
DRAWING NAME:
599.34 TC C0 D D 599.72 TC 599.32 TC 599.05 TC
598.84 BC 599.22 BC 598.82 BC 598.55 BC
599.16
599.48 TC 599
598.98 BC
599.48 599.62
599 GRADING, EROSION, AND
SEDIMENT CONTROL PLAN
MATCH TO SHEET: C402 599.84
599.80
600.27 TC 600.37 TC 600.45 TC 600.44 TC 600.11 TC 600.02 TC 599.80 TC
599.98 TC 599.61 BC 599.52 BC 599.30 BC
599.48 BC 599.77 BC 599.87 BC 599.95 BC 599.94 BC
600
600.17 DRAWING NUMBER:
599.19 599.46
C0
600 599.87
4/20/2026 1:17:56 PM
N
1
GRADING, EROSION, AND SEDIMENT CONTROL PLAN 0' 20' 40' 60'
C401 SCALE: 1" = 20'
C401
Page 55 of 359
Page 56
599.48 TC 599
598.98 BC 24
NOT FOR CONSTRUCTION
599
599.48 599.62
MATCH TO SHEET: C401
599.80 599.84
600.27 TC 600.37 TC 600.45 TC 600.44 TC 600.11 TC 600.02 TC 599.80 TC
599.98 TC 599.61 BC 599.52 BC 599.30 BC
599.77 BC 599.87 BC 599.95 BC 599.94 BC
599.48 BC 300 Pearl Street, Suite 130
FS
600 Buffalo, NY 14202
600.17 716-551-6281
599.19 599.46
C0
600.50 600.50 600.37 600 599.87 labellapc.com
600.20
FS
598.74
598
599
598
600.45
599
DS
599
599.24
598.95
600.45
598.50
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
DS PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
598
600.54
597
597
600.22
598
599
600.36 600.61 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
600.43 Sec. 7307, for any person, unless acting under the direction of a licensed
600
598.09
C0 598.54 architect, professional engineer, or land surveyor, to alter an item in any
INSTALL AND MAINTAIN way. If an item bearing the seal of an architect, engineer, or land surveyor
TEMPORARY SILT SOCK is altered; the altering architect, engineer, or land surveyor shall affix to
599 the item their seal and notation "altered by" followed by their signature and
598
date of such alteration, and a specific description of the alteration.
597
596
600.50 © 2024
2026 LaBella Associates
60 600.29 600.30 596
0 600.11 600.04
600.02
599.53 597
598
600.17 TC
599.67 BC 600
600.18
598.01 HOME LEASING
599.50 TC 75 S CLINTON AVE SUITE 700,
599.00 BC
599.94 TC 599.88 ROCHESTER, NEW YORK 14604
599.44 BC
INSTALL AND MAINTAIN
598
59
TEMPORARY CONCRETE 600.04 TC 598.46
9
600.03
WASHOUT 599.54 BC
599.54
D 59
9 597 599.84
599.04 596
599.99 6
598.32 59 7
599.17 59 8
59
9
598
598 59
597
596
595
C0 599.46 TC
598.96 BC
599.46
595
599.34 TC
598.84 BC
INSTALL AND MAINTAIN
TEMPORARY SILT SOCK 9
59
596
597
598
WEST SENECA APARTMENTS
2544 CLINTON ST,
598
599
597
596
595
595
596
597
WEST SENECA, NY 14224
598
599
599.70 TC
D 599.20 BC
INSTALL AND MAINTAIN TEMPORARY
CONSTRUCTION ENTRANCE
599.65
598
600.11 TC NO: DATE: DESCRIPTION:
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C400 GRADING PLAN.dwg
599.61 BC
Revisions
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
GRADING, EROSION, AND
SEDIMENT CONTROL PLAN
DRAWING NUMBER:
4/20/2026 1:17:35 PM
N
1
GRADING, EROSION, AND SEDIMENT CONTROL PLAN 0' 20' 40' 60'
C402 SCALE: 1" = 20'
C402
Page 56 of 359
Page 57
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
STORM SEWER GRATE way. If an item bearing the seal of an architect, engineer, or land surveyor
12 is altered; the altering architect, engineer, or land surveyor shall affix to
"
OV MIN the item their seal and notation "altered by" followed by their signature and
ER IM 2" X 2" WOODEN SPIKES
LA UM date of such alteration, and a specific description of the alteration.
P PLACED 10' O.C.
BLOWN/PLACED FILTER MEDIA COMPOST FILTER SOCK
© 2024
2026 LaBella Associates
DISTURBED AREA UNDISTURBED AREA
MIN.
12"
2
1 SLOPE OR LESS
EXISTING CONTOURS
SECTION VIEW HOME LEASING
75 S CLINTON AVE SUITE 700,
FILTER SOCK FILLED ROCHESTER, NEW YORK 14604
8'
WITH CRUSHED STONE
DISTURBED AREA
FLO
W
FLO
W
SECURE FILTER SOCK
AS RECOMMENDED MIN. SLOPE MIN. SLOPE
STORM SEWER GRATE BY MANUFACTURER SILT FENCE
FLOW FLOW NOTES:
2" X 2" WOODEN STAKES
1. AREA CHOSEN FOR STOCKPILING OPERATIONS SHALL BE DRY AND STABLE.
PLACED 10' O.C.
2. MAXIMUM SLOPE OF STOCKPILE SHALL BE 1V:2H.
UNDISTURBED AREA
3. UPON COMPLETION OF SOIL STOCKPILING, EACH PILE SHALL BE SURROUNDED WITH
COMPOST FILTER SOCK
SILT FENCING, THEN STABILIZED WITH VEGETATION OR COVERED.
PLAN VIEW 4. SEE SPECIFICATIONS AND DETAIL FOR INSTALLATION OF SILT FENCE.
6 INLET PROTECTION IN PAVEMENT 5 COMPOST FILTER SOCK 4 TEMPORARY SOIL STOCKPILE
C501 N.T.S. C501 NYS DEC DETAIL: COMPOST FILTER SOCK C501 N.T.S.
WOVEN WIRE FENCE (MIN. 14 GAUGE W/
MAX. 6" MESH SPACING WITH FILTER CLOTH 36" MIN. FENCE
POSTS, DRIVEN MIN.
WEST SENECA APARTMENTS
10' MAX. C. TO C.
16" INTO GROUND 2544 CLINTON ST,
50' MIN. MOUNTABLE
WEST SENECA, NY 14224
BERM (OPTIONAL)
MIN.
6"
EXISTING
PAVEMENT
FILTER = 18"
3' 5:1
HEIGHT OF
MIN.
10' TYP. 2"
STAKE (TYP.)
EXISTING GROUND FILTER CLOTH
4"
MIN.
PROFILE VIEW
6"
1/8" DIA. STEEL WIRE
W
FLO
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
50' MIN. STAPLE DETAIL W
FLO
B B NO: DATE: DESCRIPTION:
10' MIN.
10' TYP.
PERSPECTIVE VIEW 1 41" SQUARE HARDWOOD Revisions
EXISTING GROUND
# STAPLES (2 PER BALE) BINDING WIRE 36" MIN. FENCE POST
C### PROJECT NUMBER:
12' MIN.
12' MIN.
EXISTING STRAW BALE (TYP.)
2241067
WOVEN WIRE FENCE (MIN. 14 GAUGE W/
3' TYP.
PAVEMENT MAX. 6" MESH SPACING WITH FILTER CLOTH
IMPERMEABLE SHEETING DRAWN BY:
20" MIN.
EMM / SCB
REVIEWED BY:
SYMBOL IMPERMEABLE SHEETING STRAW BALE (TYP.) WOOD OR METAL STAKES (2 PER BALE) UNDISTURBED SRV / DPB
FLOW GROUND
PLAN SECTION B-B ISSUED FOR:
PLAN VIEW NOTE: SITE PLAN APPROVAL
EMBED FILTER CLOTH A MIN. OF 6" IN GROUND
1. CAN BE TWO STACKED BALES OR PARTIALLY EXCAVATED TO REACH 3 FT DEPTH DATE:
CONSTRUCTION SPECIFICATIONS: 4" MIN. 4/20/2026
16" MIN.
1. STONE SIZE - USE 1-4 INCH STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.
CONSTRUCTION SPECIFICATIONS SYMBOL
DRAWING NAME:
2. LENGTH - NOT LESS THAN 50 FEET. COMPACTED SOIL
1. LOCATE WASHOUT STRUCTURE A MINIMUM OF 100 FEET AWAY FROM OPEN CHANNELS, STORM DRAIN INLETS, SENSITIVE AREAS, WETLANDS,
3. THICKNESS - NOT LESS THAN SIX (6) INCHES. BUFFERS AND WATER COURSES AND AWAY FROM CONSTRUCTION TRAFFIC.
4. WIDTH - TWENTY-FOUR (24) FOOT IF SINGLE ENTRANCE TO SITE. 2. SIZE WASHOUT STRUCTURE FOR VOLUME NECESSARY TO CONTAIN WASH WATER AND SOLIDS AND MAINTAIN AT LEAST 4 INCHES OF FREEBOARD.
5. GEOTEXTILE - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE.
6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ACCESS SHALL BE PIPED
TYPICAL DIMENSIONS ARE 10 FEET X 10 FEET X 3 FEET DEEP.
NOTES: SECTION VIEW
3. PREPARE SOIL BASE FREE OF ROCKS OR OTHER DEBRIS THAT MAY CAUSE TEARS OR HOLES IN THE LINER. FOR LINER, USE 10 MIL OR THICKER UV
BENEATH THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. RESISTANT, IMPERMEABLE SHEETING, FREE OF HOLES AND TEARS OR OTHER DEFECTS THAT COMPROMISE IMPERMEABILITY OF THE MATERIAL.
7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR
FLOWING OF SEDIMENT ONTO PUBLIC RIGHT OF WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED
4.
5.
PROVIDE A SIGN FOR THE WASHOUT IN CLOSE PROXIMITY TO THE FACILITY.
KEEP CONCRETE WASHOUT STRUCTURE WATER TIGHT. REPLACE IMPERMEABLE LINER IF DAMAGED (E.G., RIPPED OR PUNCTURED). EMPTY OR
1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. POSTS SHALL BE STEEL
EITHER "T" OR "U" TYPE OR HARDWOOD. CONSTRUCTION DETAILS
ONTO PUBLIC RIGHTS OF WAY MUST BE REMOVED IMMEDIATELY. REPLACE WASHOUT STRUCTURE THAT IS 75 PERCENT FULL, AND DISPOSE OF ACCUMULATED MATERIAL PROPERLY. DO NOT REUSE PLASTIC LINER. 2. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION.
8. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN WET-VACUUM STORED LIQUIDS THAT HAVE NOT EVAPORATED AND DISPOSE OF IN AN APPROVED MANNER. PRIOR TO FORECASTED RAINSTORMS, FENCE SHALL BE WOVEN WIRE, 6" MAXIMUM MESH OPENING.
APPROVED SEDIMENT TRAPPING DEVICE. REMOVE LIQUIDS OR COVER STRUCTURE TO PREVENT OVERFLOWS. REMOVE HARDENED SOLIDS, WHOLE OR BROKEN UP, FOR DISPOSAL OR 3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER-LAPPED BY SIX INCHES AND FOLDED.
9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN EVENT. RECYCLING. MAINTAIN RUNOFF DIVERSION AROUND EXCAVATED WASHOUT STRUCTURE UNTIL STRUCTURE IS REMOVED. FILTER CLOTH SHALL BE EITHER FILTER X, MIRAFI 100X, STABLINKA 140N, OR APPROVED EQUAL.
4. PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVED EQUAL.
5. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE.
3 STABILIZED CONSTRUCTION ENTRANCE 2 CONCRETE WASHOUT AREA WITH STRAW BALES 1 SILT FENCE DRAWING NUMBER:
C501 N.YS DEC DETAIL: STABILIZED CONSTRUCTION ACCESS C501 N.T.S. C501 NYS DEC DETAIL: SILT FENCE
4/20/2026 1:17:16 PM
C501
Page 57 of 359
Page 58
NOT FOR CONSTRUCTION
SPACES SHOULD BE
EQUAL TO LINE WIDTH
NY R7-8 MUTCD R7-1 NY R7-8
300 Pearl Street, Suite 130
12"
1 MATCH ENDS OF TRANSITION
2" PREMOULDED Buffalo, NY 14202
CURB TO ADJACENT CURBS (OR
8"
BITUMINOUS CURB
UNLESS OTHERWISE
POST MOUNT SIGN OR
716-551-6281
NOTED ON PLANS
FLUSH WITH GRADE - SEE PLANS)
JOINT FILLER EXPANSION CAP
12
2" SIGN MOUNTED ON
"
8"
BOLLARD. SEE SITE
TOP OF CURB labellapc.com
7'-0"
TYP.
45°
PLAN (TYP.)
FLUSH CURB
4" WIDE
SEE PLANS
6"
PARKING
1'-4"
SPACE
PAVEMENT
12"
MARKING
1'-0"
1" 4'-0"
3'-0" MIN. NOTES:
#4 1'-6" LONG THIS PART OF DOWEL TO 6'-0" MAX.
4'-0"
BE PAINTED AND OILED 1. ALL STRIPING SHALL BE WHITE
ELEVATION AT EXPANSION JOINT TERMINAL/TRANSITION CURB 11 CROSSWALK
8' TYP. 8' TYP.
C502 N.T.S.
PAVEMENT SYMBOL PER ADA
WHITE ON BLUE BACKGROUND EXP: EXP:
NOTE: ALL PARKING STRIPING TO BE YELLOW 3
TOP OF CURB 8" CAP SCREW
#4 1'-6" LONG 3
8" FLAT WASHER
A
12 ADA PARKING SPACE STRIPING (ZINC PLATED)
CERTIFICATE OF AUTHORIZATION NUMBER:
SIGN FACE
C502 NEW SIGN PANEL (16 PROFESSIONAL ENGINEERING: 0021272
EXPANSION JOINT MATERIAL N.T.S. 2" x 2" SQ.
ROUNDED GA. GALV. STEEL) LAND SURVEYING: 0021271
AT CONCRETE SIDEWALKS
D
GEOLOGICAL: 0021659
D/2
R=1" 3
8" HEX NUT
CONCRETE SIDEWALK 8" (ZINC PLATED)
2"
A A
1
OR TOPSOIL
SECTION A-A
A CONSTRUCTION JOINT TOP OF PAVEMENT It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
TYP.
SEE PAVEMENT SECTION
6"
architect, professional engineer, or land surveyor, to alter an item in any
ELEVATION AT 2" x 2" SQUARE UNISTRUT POST way. If an item bearing the seal of an architect, engineer, or land surveyor
(GALV. STEEL) VARIABLE
1'-6"
CONSTRUCTION JOINT is altered; the altering architect, engineer, or land surveyor shall affix to
LENGTH (PERFORATED) the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SELECT DOMED CONCRETE FILL NEW SIGN PANEL (16 DOMED CONCRETE FILL
6" BACKFILL GA. GALV. STEEL)
7'-0" (MAX.)
5'-0" (MIN.)
MATERIAL CONTINUOUS BED © 2024
2026 LaBella Associates
6" O.D. STEEL PIPE WITH PLASTIC
SUBBASE COURSE 6" O.D. STEEL PIPE WITH PLASTIC
1'-9" (MIN.)
SLEEVE (YELLOW) A A SLEEVE (YELLOW)
MIN.
6"
DOWEL
3'-6"
D
3'-6"
DOMED IN GRASS AREA 2 14" x 2 1 4" SQUARE UNISTRUT
D/2
6" 6" FLUSH IN CONCRETE
OR PAVED AREA 2" x 2" SQUARE UNISTRUT POST POST BASE (GALVANIZED STEEL)
2"
3"
VERTICAL
(GALV. STEEL) VARIABLE
LENGTH (PERFORATED)
3
8" CAP SCREW
DOMED IN GRASS AREA
HOME LEASING
3
8" FLAT WASHER
75 S CLINTON AVE SUITE 700,
SECTION A-A
7'-0" (MAXIMUM)
5'-0" (MINIMUM)
(ZINC PLATED) ROCHESTER, NEW YORK 14604
SEE ASPHALT
TYPICAL SIGN FACE
PAVEMENT
TYPICAL
DETAILS
GRASS
PAVED AREA 2" x 2" SQ.
NOTES: AREA
4000 PSI CONCRETE 2 14" x 2 14" SQUARE UNISTRUT
3'-6"
3
8" HEX NUT (ZINC PLATED)
3'-6"
1. SLOPE TOP OF CURB 1/4" PER FOOT TOWARD PAVEMENT. POST BASE (GALVANIZED STEEL)
2. CONTRACTION JOINTS SHALL BE FORMED OR SAWCUT EVERY 10 FEET TO DEPTHS SLIGHTLY BELOW THE PAVEMENT SURFACE. UNDISTURBED EARTH SECTION A-A
4" TO 6"
3. EXPANSION JOINTS 1/2" IN WIDTH SHALL BE FORMED WITH A PREMOULDED BITUMINOUS JOINT FILLER EVERY 40 FEET. OR 18" SONOTUBE 5,000 PSI CONCRETE
3" x 3 8" BOLT (ZINC PLATED)
4. EXPANSIONS JOINTS AND FORMED CONTRACTION JOINTS ARE TO BE EDGED WITH CONCRETE FINISHING TOOLS. SUBBASE COURSE AND 3 8" 0 NUT (ZINC PLATED) UNDISTURBED EARTH
5. CONCRETE SEALING AGENT SHALL BE APPLIED THE SAME DAY THAT CURBS ARE CONSTRUCTED. NOTES:
6"
OR 18" SONOTUBE
4'-0"
6"
6. CONCRETE CURBING WITHIN R.O.W. SHALL CONFORM WITH NYSS M609-2R1.
7. CURB THICKNESS T IS TO BE 5" OR AS INDICATED ON THE DRAWINGS. 1. MAINTAIN TWO FEET OF CLEARANCE FROM SUBBASE COURSE
8" MIN.
8" MIN.
8. PROVIDE 0" CURB REVEAL FOR HEADER CURB CURB AT SIDEWALK RAMPS AND 1" CURB REVEAL FOR HEADER CURB AT DRIVEWAYS. FACE OF CURB TO ANY PART OF SIGN, AS
9. ALL CURB, EXCEPT HEADER CURB USED FOR SIDEWALK ACCESS RAMPS, IS TO HAVE THE 1" RADIUS. NOTE: APPLICABLE.
10. GRADED STONE BACKING IS TO BE PLACED WHEN SIDEWALK DOES NOT ABUT CURB. 2. SEE PLANS FOR SIGN AND POST LOCATIONS. NOTES:
1. FINAL LOCATION OF BOLLARDS SHALL BE APPROVED
11. USE 5000 PSI CONCRETE FOR CONVENTIONALLY FORMED CURB. AND 5000 PSI CONCRETE FOR MACHINE FORMED CURB. BY THE OWNER OR ARCHITECT/ENGINEER.
1. FINAL LOCATION OF BOLLARDS SHALL BE APPROVED BY THE OWNER OR ARCHITECT/ENGINEER.
10 CONCRETE CURB 9 BOLLARD 8 POST MOUNT SIGN 7 BOLLARD MOUNTED SIGN
C502 N.T.S. C502 N.T.S. C502 N.T.S. C502 N.T.S.
INITIAL FULL DEPTH SAW CUT
FINAL SAW CUT. MATCH EXISTING SEE NOTE 2
PAVEMENT. CAP SEAM WITH
BITUMINOUS SEALER. (SEE NOTE 2)
TOP COURSE
BINDER COURSE
WEST SENECA APARTMENTS
SEE NOTE 2 18" SUBBASE COURSE 2544 CLINTON ST,
WEST SENECA, NY 14224
EXISTING
ASPHALT PAVEMENT NOTES: PAVEMENT
1. HMA ITEMS ARE BASED ON PG 64-22 BINDER, ESALs LESS THAN 30,000,000. TACK COAT IS REQUIRED BETWEEN ALL LIFTS OF ASPHALT. USE OF POLYPHOSPHORIC ACID (PPA) TO MODIFY THE BINDER
6"x6" WELDED WIRE EXISTING
PROPERTIES IS PROHIBITED. THIS PROHIBITION ALSO APPLIES TO THE USE OF PPA AS A CROSS-LINKING AGENT FOR POLYMER MODIFICATION.
TOP AND BOTTOM SUBBASE
8" THICK
2. BUTT JOINTS, CREATED BY A FULL-DEPTH SAWCUT, SHALL BE USED BETWEEN NEW AND EXISTING PAVEMENTS. THE ASPHALT TOP COURSE SHALL BE LAID SUCH THAT IT UNIFORMLY OVERLAPS THE 4,500 PSI CONCRETE
ADJACENT COLD MAT BY 2"-3". THE THICKNESS OF THE OVERLAP MATERIAL SHALL BE 1/4 THE COMPACTED THICKNESS OF THE COURSE, SO AS TO RESULT IN A SMOOTH AND WELL-COMPACTED JOINT
AFTER ROLLING. BROADCASTING OF THE OVERLAP MATERIAL ONTO THE LANE IS NOT ALLOWED. IF THE OVERLAP IS EXCESSIVE, THE EXCESS MATERIAL SHALL BE TRIMMED OFF SO THAT THE MATERIAL x x x x x x x
ALONG THE JOINT IS UNIFORM. THE COARSE PARTICLES OF AGGREGATE IN THE OVERLAP MATERIAL SHALL BE REMOVED AND WASTED IF DEEMED NECESSARY BY THE INSPECTOR.
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
x x x x x x GEOTEXTILE STABILIZATION
3. DESIGN PGB CONTENT SELECTION: THE PRODUCER SELECTS THE DESIGN PGB CONTENT THAT RESULTS IN A COMPACTED DENSITY OF 96.5% Gmm AT THE DESIGN NUMBER OF GYRATIONS (Ndesign). 12" COMPACTED FABRIC (SEE ASPHALT
1 21" 9.5 F2 TOP COURSE HMA UNDER NO CIRCUMSTANCES SHALL THE PERFORMANCE GRADED BINDER CONTENT IN THE HMA MIXTURE BE LESS THAN 5.8% FOR A 9.5 DESIGN, 5.2% FOR A 12.5 DESIGN, 4.5% FOR A 19.0 DESIGN, 4.2% SUBBASE MATERIAL NO: DATE: DESCRIPTION:
PAVEMENT DETAILS)
80 SERIES COMPACTION FOR A 25.0 DESIGN, OR 3.7% FOR A 37.5 DESIGN. ALL VOLUMETRIC AND MECHANICAL PROPERTIES ARE CHECKED AT THIS PGB CONTENT TO ENSURE THAT ALL REQUIREMENTS ARE MET. NOTES: Revisions
NYSDOT ITEM NO. 402.098202 WELL COMPACTED SUBGRADE
2-1/2" 19.0 F9 BINDER COURSE HMA 4. PERFORM ALL WARRANTY WORK IN ACCORDANCE WITH MATERIALS PROCEDURE (MP) 402-01, WARRANTY REQUIREMENTS FOR HOT MIX ASPHALT (HMA) TOP COURSE. 1. VERTICALLY SAW CUT ALL ASPHALT FULL DEPTH.
80 SERIES COMPACTION 2. BLOW CLEAN AND APPLY TACK COAT 0.050 GAL/SY AT ALL ASPHALT TO ASPHALT SURFACES. PROJECT NUMBER:
COMPACTED
NYSDOT ITEM NO. 402.198902 5. AS PER STANDARD SPECIFICATION SECTION 401-4.01 CERTIFIED PRODUCTION, PRODUCTION LESS THAN 500 TONS, AND HIGHWAY PERMIT PRODUCTION, PRODUCTION MEETING THE SPECIFICATION 3. REFER TO STANDARD DUTY PAVEMENT SECTION DETAIL FOR COURSE THICKNESS. 2241067
SUBGRADE
REQUIREMENTS WILL BE ASSIGNED A QAF OF 1.00. PRODUCTION FAILING TO MEET THE SPECIFICATION REQUIREMENTS WILL BE SUBJECT TO EVALUATION ACCORDING TO SECTION 401-4.03, EVALUATION
6" 37.5 F9 BASE COURSE HMA OF SUBLOTS REPRESENTED BY 0.85 QAF.
6 CONCRETE PAD 5 STANDARD DUTY PAVEMENT JOINT DRAWN BY:
80 SERIES COMPACTION EMM / SCB
NYSDOT ITEM NO. 402.378902 1 1/2" ASPHALT CONCRETE TOP COURSE C502 N.T.S. C502 N.T.S. REVIEWED BY:
2 1/2" ASPHALT CONCRETE BINDER COURSE SRV / DPB
12" SUBBASE COURSE, TYPE 2 12" STONE SUBBASE COURSE
(INSTALLED IN TWO 6" LIFTS) BEVEL EDGE ISSUED FOR:
NYSDOT ITEM NO. 304.12 ASPHALT EMULSION TACK 6" SITE PLAN APPROVAL
COAT NYSDOT ITEM
407.01 - TACK COAT FINISH GRADE DATE:
4/20/2026
MATCH ORIGINAL RESTORE LAWN DISTURBED BY CONSTRUCTION MATCH ENDS OF TRANSITION
CURB
SHOULDER SLOPE AND PROVIDE NEW 6" MINIMUM DEPTH CURB TO ADJACENT CURBS (OR DRAWING NAME:
MECHANICALLY SCREENED TOPSOIL CURB CURB TERMINAL FLUSH WITH GRADE - SEE PLANS)
EXTEND BASE COURSE AT FREE EDGE
FLUSH CURB
6"
1'-6" 6"
COMPACTED SUBGRADE
1'-6"
FINISHED GRADE FINISHED GRADE
GEOTEXTILE STABILIZATION FABRIC,
TENSAR T-130 OR APPROVED EQUAL CONSTRUCTION DETAILS
1'-0"
NOTES: RESTORE LAWN DISTURBED BY
6'-0" UNLESS
6'-0" CONSTRUCTION AND PROVIDE NEW
COMPACTED 1. PROVIDE ADDITIONAL SUBBASE MATERIAL WHERE FILL IS REQUIRED TO OBTAIN PROPER 6" MINIMUM DEPTH MECHANICALLY OTHERWISE NOTED
SUBGRADE SUBGRADE ELEVATION, OR TO REPLACE UNSUITABLE SUBGRADE MATERIAL. SCREENED TOPSOIL
4 PAVEMENT SECTION WITHIN R.O.W. 3 ASPHALT PAVEMENT SECTION 2 CURB TERMINAL 1 CURB TRANSITION
DRAWING NUMBER:
C502 N.T.S. C502 N.T.S. C502 N.T.S. C502 N.T.S.
4/20/2026 1:17:48 PM
C502
Page 58 of 359
Page 59
NOT FOR CONSTRUCTION
SIDEWALK SIDEWALK GR B
AS
S
4'-0
GR SE " MIN
AD
E BR
EP
LA
300 Pearl Street, Suite 130
A EA N
KB
AC
Buffalo, NY 14202
KO A
FC A 716-551-6281
UR
B >5 7.5% MAX SLOPE 4'-0" MIN.
'
3'-0" SEE PLAN 3'-0"
labellapc.com
SEE CONCRETE SIDEWALK DETAIL
SEE CONCRETE SIDEWALK DETAIL
B
DETECTABLE
0" TOP OF PAVEMENT
WARNING SYSTEM 2'- GR
AS
S SECTION A-A
MEET FLUSH WITH
A TOP OF PAVEMENT 25% MAX SLOPE
MEET FLUSH WITH MEET FLUSH WITH TOP OF PAVEMENT 3'-0
TOP OF PAVEMENT "
DETECTABLE WARNING SYSTEM A
0" CURB REVEAL VARIES
DETECTABLE WARNING SYSTEM
ACCESS RAMP AT CORNER - ISOMETRIC OPTION 1 ACCESS RAMP - ISOMETRIC OPTION 3 A PAVEMENT
7.5%
CURB
TOP OF CURB 7.5% MAX SLOPE
SIDEWALK TYPE "B" RAMP ISOMETRIC
SIDEWALK
SECTION B-B EXP: EXP:
GR
NOTES:
AD TOP OF PAVEMENT
E BR TRANSITION FLUSH WITH PAVEMENT CERTIFICATE OF AUTHORIZATION NUMBER:
A EA 1. 7.5% IS MAXIMUM SLOPE OF ACCESS RAMP.
KB PROFESSIONAL ENGINEERING: 0021272
AC 2. SURFACE OF ACCESS RAMP IS TO BE STABLE, FIRM AND SLIP-RESISTANT. TEXTURE SURFACE WITH
KO A LAND SURVEYING: 0021271
FC
UR SECTION A-A COARSE BROOM RUNNING TRANSVERSE TO SLOPE OF ACCESS RAMP.
GEOLOGICAL: 0021659
B< 3. ENTIRE AREA OF ACCESS RAMP AND LANDING PAD IS TO BE 7 INCH THICK CONCRETE.
5'
SEE CONCRETE SIDEWALK DETAIL
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
SEE CONCRETE SIDEWALK DETAIL
7 SIDEWALK RAMP TYPE B Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
C503 N.T.S. way. If an item bearing the seal of an architect, engineer, or land surveyor
MEET FLUSH WITH is altered; the altering architect, engineer, or land surveyor shall affix to
A TOP OF PAVEMENT MEET FLUSH WITH the item their seal and notation "altered by" followed by their signature and
TOP OF PAVEMENT date of such alteration, and a specific description of the alteration.
DETECTABLE WARNING SYSTEM A
B
DETECTABLE WARNING SYSTEM
ACCESS RAMP AT CORNER - ISOMETRIC OPTION 2 ACCESS RAMP - ISOMETRIC OPTION 4 © 2024
2026 LaBella Associates
8 SIDEWALK RAMP TYPE D 3'-0"
MINIM
A UM TOP OF PAVEMENT TOP OF CURB
C503 N.T.S. WIDTH VARIES, SEE PLANS SIDEW 12 12
ALK 1 1
B
8"
DETECTABLE WARNING 6'-0"
3'-0" MIN.
SEE PLAN 6'-0"
HOME LEASING
4,500 PSI CONCRETE TOOLED NOTCH 38" x 83" VERTICAL CURB 75 S CLINTON AVE SUITE 700,
SYSTEM PER DETAIL 2'-0"
" MEET FLUSH WITH SECTION A-A ROCHESTER, NEW YORK 14604
R1
SLOPE AS SHOWN ON PLANS 6" UNLESS OTHERWISE SHOWN ON PLANS TOP OF PAVEMENT
A
TOP OF SIDEWALK RAMP TYPE A ISOMETRIC
5"
SLOPE PAVEMENT GRASS
VARIES
TOP OF CURB SIDEWALK
12 12
6"
SEE PAVEMENT 1 1 3'-0
"M
10"
SECTIONS 12 IN.
(SE
6'-0" HEADER EP
1 LA
N)
SUBBASE MATERIAL TRANSITION CURB TRANISITON
A
TOP OF PAVEMENT
6"
0"
2'-
1 12
2" 2" 8" VIEW A-A MEET FLUSH WITH
NOTES: 1:50
TOP OF PAVEMENT
8" 0" CURB REVEAL DETECTABLE WARNING SYSTEM
12
1. 1:12 IS MAXIMUM SLOPE OF ACCESS RAMP AND MAX
1 SIDEWALK
SIDE FLARE IN PAVED AREA.
6 CONCRETE SIDEWALK AND INTEGRAL VERTICAL CURB SECTION 2. SURFACE OF ACCESS RAMP IS TO BE STABLE,
A
FIRM AND SLIP-RESISTANT. TEXTURE SURFACE
C503 N.T.S. ACCESS LANDING PAD
WITH COARSE BROOM RUNNING TRANSVERSE
RAMP 3'-0" MINIMUM
TO SLOPE OF ACCESS RAMP.
3. ENTIRE AREA OF ACCESS RAMP AND LANDING
ACCESS RAMP - TYPE C ISOMETRIC
PAD IS TO BE 7 INCH THICK CONCRETE.
NOTES:
SECTION B-B
1. 1:12 IS MAXIMUM SLOPE OF ACCESS RAMP. WEST SENECA APARTMENTS
5 SIDEWALK RAMP TYPE A 2. SURFACE OF ACCESS RAMP IS TO BE STABLE, FIRM AND SLIP-RESISTANT. TEXTURE SURFACE
WITH COARSE BROOM RUNNING TRANSVERSE TO SLOPE OF ACCESS RAMP.
2544 CLINTON ST,
4" WIDE 3. ENTIRE AREA OF ACCESS RAMP AND LANDING PAD IS TO BE 7 INCH THICK CONCRETE. WEST SENECA, NY 14224
C503 N.T.S.
PARKING
SPACE
50%-60% OF 4 SIDEWALK RAMP TYPE C
PAVEMENT
MARKING BASE DIAMETER C503 N.T.S.
4'-0"
2'-0"
4'-0"
0.20"
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
5)
TE
E NO
0.90"-1.41" S (SE NO: DATE: DESCRIPTION:
1 1 SAW-CUT, OR WET CUT CONCRETE
ELECTRIC CHARGING STATION RIE 2" WIDE PREMOULDED BITUMINOUS 2" WIDE PREMOULDED BITUMINOUS
PAVEMENT SYMBOL VA JOINT FILLER WITH 5 8" DEEP X 12" WIDE JOINT FILLER WITH 5 8" DEEP X 12" WIDE WITH TROWEL OR JOINT TOOL, Revisions
1
SELF LEVELING CAULKING SEALANT SELF LEVELING CAULKING SEALANT 3 SLAB THICKNESS, FULL WIDTH.
DOME SECTION FINISHED GRADE FINISHED GRADE FINISHED GRADE
PROJECT NUMBER:
NO ISOMETRIC
2241067
ELECTRIC PARKING 1.625"- 2.41"
C TO C FILL JOINTS WITH UNILOCK POLYMERIC DRAWN BY:
EMM / SCB
VEHICLE
PARKING
ANY JOINT SAND OR APPROVED EQUIVALENT 1" THICK COMPACTED SETTING BED
OF WASHED COARSE AGGREGATE REVIEWED BY:
SRV / DPB
TIME TYPICAL WARNING UNIT
1.625"-2.41"
ONLY WHILE THIS PART OF DOWEL TO EXPANSION JOINT CONTROL JOINT
C TO C
CHARGING SIDEWALK ACCESS RAMP BE PAINTED AND OILED ISSUED FOR:
1" TO 4"
12" X 18" #4 - 16" LONG SMOOTH DOWEL AT 18" ON-CENTER
SITE PLAN APPROVAL
12" X 18" 2" DIAMETER WEEP HOLE AT LOW POINT
ELECTRIC VEHICLE EDGE OF RAMP CONCRETE DRILL AND EPOXY GROUT INTO EXISTING CONCRETE
ACCESSIBLE SYMBOL CHARGING STATION
NO PARKING FILL WITH SETTING BED MATERIAL SIDEWALK (CENTERED) AND EXISTING BUILDING DATE:
COLOR WHITE ON BLUE BACKGROUND MUTCD R7-1 FOUNDATION AT DOORWAYS. COAT DOWEL IN NEW 4/20/2026
SIDEWALK NOTES:
0.625"
FEDERAL DESIGNATION
7"
SURFACE WITH BOND BREAKER
CURB FLUSH WITH PAVEMENT DRAWING NAME:
1"-4"
1. CONCRETE SHALL BE 4,500 PSI AIR ENTRAINED MIX AT 28 DAYS
2. COMPACTED SUBBASE MATERIAL SHALL COMPLY WITH NYSDOT ITEM 304.14,
RESERVED 1" 0.625"
RESHAPE CURB BACKING
AT WEEP HOLE LOCATION
CONTRACTOR TO RESTORE LAWN DISTURBED BY
CONSTRUCTION AND PROVIDE NEW 6" MECHANICALLY TYPE 4
PARKING 12" X 18" BACK EDGE OF CURB
SCREENED TOPSOIL AND ESTABLISH TURF. 3. CONCRETE SURFACE SHALL RECEIVE A BROOM FINISH AND TWO COATS OF A
MEMBRANE FORMING SEALER AT RATES SPECIFIED BY THE PRODUCT
6" SUBBASE COURSE 5" 4,500 PSI CONCRETE
RESERVED MANUFACTURE.
NY R7-8
FEDERAL DESIGNATION
DOME SPACING SECTION 3"
6" COMPACTED SUBBASE MATERIAL 4. EXPANSION JOINTS SHALL BE PROVIDED AT ALL FITTED STRUCTURES AND AT
EVERY 25' ON CENTER.
CONSTRUCTION DETAILS
NOTES: 5. CONTROL JOINTS SHALL BE EVERY 5' OR AS SHOWN ON THE PLANS AND IN
12" X 6" ACCORDANCE WITH ACI 330-R92. THESE JOINTS SHALL BE COMPLETED
1. QUANTITY OF TRUNCATED DOMES SHOWN IS FOR ILLUSTRATIVE PURPOSES ONLY AND TO DEPICT REQUIRED SQUARE GRID PATTERN.
VAN VAN ACCESSIBLE
2. TRUNCATED DOMES ARE TO BE ALIGNED ON THE SQUARE GRID PATTERN IN THE PREDOMINANT DIRECTION OF TRAVEL.
WITHIN 24 HOURS OF CONCRETE PLACEMENT. SCORED JOINTS SHALL BE
ELECTRIC CHARGING SYMBOL ACCESSIBLE MUTCD R7-8a
3. ENTIRE DETECTABLE WARNING SYSTEM FIELD, INCLUDING TRUNCATED DOMES, IS TO BE DARK GRAY IN COLOR, N7 PER MUNSELL BOOK NOTATION, OR APPROVED EQUIVALENT.
1 1
4-INCH WIDTH MINIMUM AND 3 OF THE THICKNESS OF THE CONCRETE
4'x4', COLOR WHITE ON GREEN FEDERAL DESIGNATION 6. SIDEWALK ADJACENT TO THE CURB SHALL HAVE A 2.00% CROSS-SLOPE TO
4. OUTER EDGE OF THE DETECTABLE WARNING SYSTEM FIELD IS TO BE LOCATED SO THAT THE EDGE OF THE WARNING FIELD NEAREST TO THE STREET IS 1 TO 4 INCHES BEHIND THE BACK
BACKGROUND THE CURB. OTHER AREA AS INDICATED ON THE GRADING PLAN.
EDGE OF THE CURB SECTION.
7. ALL JOINTS AND EXPOSED EDGES SHALL BE ROUNDED WITH JOINT TOOL. DRAWING NUMBER:
5. DETECTABLE WARNING SYSTEM IS TO EXTEND ACROSS THE FULL WIDTH OF A SIDEWALK ACCESS RAMP, BUT NOT UP THE SIDE FLARES. COMPACTED SUBGRADE
PAVEMENT MARKINGS AND SIGNAGE BRICK DETECTABLE WARNING SYSTEM AT CURB CONCRETE SIDEWALK
4/20/2026 1:17:24 PM
3 2 1
C503 N.T.S. C503 N.T.S. C503 N.T.S.
C503
Page 59 of 359
Page 60
NOT FOR CONSTRUCTION
COVER PIPE CONNECTION TO END INSTALL FLAMP ON 24" (600 mm) ACCESS PIPE OPTIONAL INSPECTION PORT
CAP WITH ADS GEOSYNTHETICS 601T PART #: MCFLAMP
NON-WOVEN GEOTEXTILE
MC-3500 CHAMBER
MC-3500 END CAP
6" MAX
PONDING 4.0H
MAX. PONDING/
HEIGHT 1V
RIM OF CB OVERFLOW ELEV. STORMTECH HIGHLY RECOMMENDS
FLEXSTORM INSERTS IN ANY UPSTREAM 300 Pearl Street, Suite 130
STRUCTURES WITH OPEN GRATES
6" MIN. ORGANIC Buffalo, NY 14202
FILTER MEDIA 716-551-6281
NOTES: ELEVATED BYPASS MANIFOLD
1. CONTRACTOR SHALL INSTALL FILTER MEDIA AFTER SITE HAS BEEN STABILIZED TO labellapc.com
MINIMIZE POTENTIAL OF SEDIMENT CONTAMINATION OF MEDIA.
2. FILTER MEDIA SHALL BE LOAM/SAND MIX, NYSDOT BIO SOIL MIX ITEM #208.01030022,
CONTAINING A MINIMUM OF 85% TO 88% COARSE/MEDIUM SAND BY VOLUME, 8% TO 12%
24" MIN.
SOIL FINES, AND 3% TO 5% ORGANIC MATTER.
FILTER MEDIA 3. ORGANIC FILTER MEDIA SHALL MEET SAME CRITERIA AS ABOVE WITH THE EXCEPTION OF
CONTAINING 10% TO 12% ORGANIC MATTER.
4. SOIL SHOULD FALL WITHIN USCS TYPES SM OR ML WITH PERMEABILITY OF AT LEAST 1.0
FEET PER DAY. SOIL SHOULD BE FREE FROM STONES, STUMPS, ROOTS OR OTHER WOODY SUMP DEPTH TBD BY CATCH BASIN
MATERIAL OVER 1" IN DIAMETER. SITE DESIGN ENGINEER OR MANHOLE
(24" [600 mm] MIN RECOMMENDED)
5. PLACEMENT OF THE PLANTING SOIL SHOULD BE IN LIFTS OF 12" TO 18", LOOSELY
24" (600 mm) HDPE ACCESS PIPE REQUIRED ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN
6"-12" DRAINAGE COMPACTED TO AT MOST 80% PROCTOR TEST. PH RANGE: 5.2 - 7.00. USE FACTORY PARTIAL CUT END CAP PART #: FOUNDATION STONE AND CHAMBERS
GRAVEL JACKET 6. FILTER FABRIC TO BE NON-WOVEN CLASS 'C', MIRAFI 180-N OR APPROVED EQUIVALENT MC3500IEPP24BC OR MC3500IEPP24BW 8.25' (2.51 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
7. DRAINAGE GRAVEL TO MEET AASHTO M-43. NO.67, SIZE 0.25" TO 0.75"
8. CONTRACTOR TO PROVIDE PLANTING SOIL SUBMITTAL SPECIFICATION FOR REVIEW AND
FILTER FABRIC
APPROVAL PRIOR TO CONSTRUCTION.
9. WETLAND SEED MIX SHALL BE USED AS INDICATED IN SPECIFICATIONS. 7 MC-3500 ISOLATOR ROW PLUS DETAIL EXP: EXP:
4" PERFORATED PVC @ 0.2% SUBGRADE OR
10. CONTRACTOR SHALL PROVIDE AT LEAST TWO PERMEABILITY TESTS FOR EACH FACILITY C504 N.T.S.
EXISTING SOIL DRAINAGE GRAVEL
LOCATED AT OPPOSITE SIDES OF FACILITY.
8 BIORETENTION INSERTA TEE DETAIL UNDERDRAIN DETAIL CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
NTS NTS
C504 N.T.S. DO NOT INSTALL STORMTECH STORMTECH LAND SURVEYING: 0021271
INSERTA-TEE AT CHAMBERS STORMTECH CHAMBER GEOLOGICAL: 0021659
CHAMBER JOINTS END CAP
PROVIDE CAST IRON FRAME PROVIDE CAST IRON CLEANOUT THREADED PLUG IP THD OR BRASS A OUTLET MANIFOLD
AND COVER, SET FLUSH SCREW PLUG (HS 67). PVC PLUGS NOT ALLOWED. PROVIDE 1"-3" It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
WITH FINISH GRADE 10" CLEARANCE BETWEEN PLUG & UNDERSIDE OF COVER CONVEYANCE PIPE Sec. 7307, for any person, unless acting under the direction of a licensed
MATERIAL MAY VARY architect, professional engineer, or land surveyor, to alter an item in any
GRADE (PVC, HDPE, ETC.)
FOUNDATION STONE way. If an item bearing the seal of an architect, engineer, or land surveyor
FINISH GRADE FOR UNPAVED AREAS BENEATH CHAMBERS is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
7 1/2"
WITHOUT FRAME AND COVER
1"
date of such alteration, and a specific description of the alteration.
A
ADS GEOSYNTHETICS 601T
17" INSERTA TEE SECTION A-A
CONNECTION
INSERTA TEE TO BE NON-WOVEN GEOTEXTILE DUAL WALL © 2024
2026 LaBella Associates
COMPACTED FILL TAMPED IN 6" INSTALLED, CENTERED PERFORATED
(X)
LAYERS OVER CORRUGATION HDPE
STORMTECH UNDERDRAIN
STORM SECTION A-A SIDE VIEW END CAP
DWV PVC FEMALE ADAPTER, IP PLACE ADSPLUS WOVEN GEOTEXTILE
THREAD x SOCKET (CENTERED ON INSERTA-TEE INLET) OVER
C.O.
BEDDING STONE FOR SCOUR PROTECTION AT
6" RISER: SDR-35 PVC (ASTM D-2241)
WITH SOLVENT WELDED JOINTS LETTERING ON COVER
SIDE INLET CONNECTIONS. GEOTEXTILE MUST
EXTEND 6" (150 mm) PAST CHAMBER FOOT CHAMBER
MAX DIAMETER OF
INSERTA TEE
HEIGHT FROM BASE
OF CHAMBER (X)
B B
HOME LEASING
FOUNDATION STONE
PROVIDE SDR-35 GASKETED NOTES: SC-310 6" (150 mm) 4" (100 mm)
A BENEATH CHAMBERS
75 S CLINTON AVE SUITE 700,
FITTINGS AS NECESSARY; 1/8TH SC-800 10" (250 mm) 4" (100 mm) ROCHESTER, NEW YORK 14604
6" x 6" x 6" SDR-35 TRUE 45 DEGREE BEND, OR TWO 1/16TH BENDS 1. FRAME AND COVER TO BE USED DC-780 10" (250 mm) 4" (100 mm)
NOTES:
ONLY IN PAVED AREAS. ADS GEOSYNTHETICS 601T
WYE WITH BENDS AS NECESSARY COMPACTED CRUSHED STONE FILL · PART NUMBERS WILL VARY BASED ON INLET PIPE MC-3500 12" (300 mm) 6" (150 mm)
A NON-WOVEN GEOTEXTILE
MATERIALS. CONTACT STORMTECH FOR MORE
6" MIN. 6" MIN. DEPTH = 1/2 OD + 12" MIN. 2. CRUSHED STONE: NO. 1 WASHED MC-4500 12" (300 mm) 8" (200 mm)
INFORMATION.
STONE OR A MIX OF NO. 1 AND · CONTACT ADS ENGINEERING SERVICES IF INSERTA TEE MC-7200 12" (300 mm) 8" (200 mm) NUMBER AND SIZE OF UNDERDRAINS PER SITE DESIGN ENGINEER
4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS SECTION B-B
NO. 2 WASHED STONE INLET MUST BE RAISED AS NOT ALL INVERTS ARE INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS
POSSIBLE. 6" (150 mm) TYP FOR SC-800, DC-780, MC-3500, MC-4500 & MC-7200 SYSTEMS
RECOMMENDED METHODS FOR JOINING OF GASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRON
SOLVENT WELD PIPE:
SELECT SELECT
GRANULAR
FILL
GRANULAR
FILL
1. CLEAN DRY HUBS & SPIGOTS
5 MC-3500 INSERTA-TEE INLET 4 MC-3500 UNDERDRAIN
2. APPLY PRIMER TO PARTS BEING C504 N.T.S. C504 N.T.S.
CONNECTED
3. APPLY PVC SOLVENT WELD CEMENT
FLOW DIRECTLY OVER PRIMER
** PVC TYPE IS COMPATIBLE FOR SOLVENT
WELDING TO SDR-35 OR ANY OTHER PVC TYPE I ACCEPTABLE FILL MATERIALS: STORMTECH MC-3500 CHAMBER SYSTEMS
PIPE MADE TO STEEL PIPE OUTSIDE DIMENSIONS
MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT
FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE
6" SDR-35 PVC (ASTM D2241) UNDISTURBED EARTH CRUSHED STONE BEDDING 6" SDR-35 PVC (ASTM D2241) PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED
TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S
SERVICE LATERAL WITH PUSH ON D N/A INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND
SERVICE LATERAL WITH PUSH ON DEPTH=1/2 OD +6" PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.
PREPARATION REQUIREMENTS.
NEOPRENE RUBBER GASKETS NEOPRENE RUBBER GASKETS PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER
6 CLEANOUT FOR NEW STORM LATERAL INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE
GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35%
AASHTO M145¹
A-1, A-2-4, A-3 BEGIN COMPACTIONS AFTER 18" (450 mm) OF MATERIAL OVER
FINES OR PROCESSED AGGREGATE. THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS
C504 N.T.S. C
TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 18" (450 mm)
ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT
MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF
OR IN 12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY
FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY
WEST SENECA APARTMENTS
SUBBASE MAY BE A PART OF THE 'C' LAYER. AASHTO M43¹
THIS LAYER.
3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10
FOR PROCESSED AGGREGATE MATERIALS. 2544 CLINTON ST,
FRAME & GRATE: EJ CASTINGS WEST SENECA, NY 14224
NO. 4 BARS, 4 EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS
RETICULINE GRATE, H-20 LOAD RATED, CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5
AASHTO M43¹
GRASS CONCRETE B FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER NO COMPACTION REQUIRED
BICYCLE PROOF, ADA-COMPATIBLE SIDES (TYP.) 3, 357, 4, 467, 5, 56, 57
ABOVE.
ASPHALT
4,000 PSI CONCRETE POURED IN PLACE FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE AASHTO M43¹
CL SUCH THAT RIM WILL MEET FINISH GRADE. A CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3
SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. 3, 357, 4, 467, 5, 56, 57
PLEASE NOTE:
TOPSOIL 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".
REFER TO ASPHALT 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.
SOILTIGHT ADAPTER PAVEMENT DETAILS 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR
4" MIN
COMPACTION REQUIREMENTS.
SELECT EARTH
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
4. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.
5. WHERE RECYCLED CONCRETE AGGREGATE IS USED IN LAYERS 'A' OR 'B' THE MATERIAL SHOULD ALSO MEET THE ACCEPTABILITY CRITERIA OUTLINED IN TECHNICAL NOTE 6.20 "RECYCLED CONCRETE STRUCTURAL BACKFILL".
ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL NO: DATE: DESCRIPTION:
AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS
TYPE 1 OR 2 SUBBASE PAVEMENT LAYER (DESIGNED Revisions
BY SITE DESIGN ENGINEER)
2" DEEP x 2" WIDE
XX" STANDARD H-20 GRATE CONSTRUCTION JOINT MINIMUM COVER ELEVATION: XX
EXPOXY GROUT 100% 6"
PLAN SOLIDS (TYP.) 30" SQUARE
TYP. ALL WALLS D *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED
8'
PROJECT NUMBER:
PERIMETER STONE
C
INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,
INCREASE COVER TO 24" (600 mm). 18" (450 mm) (2.4 m) 2241067
CONNECT UNDERDRAIN WHERE SHOWN (SEE NOTE 4) MIN* MAX
OR PROVIDE (2) 10 FOOT STUBS OF 12" (300 mm) MIN
TOP CHAMBER ELEVATION: XX DRAWN BY:
PERFORATED PVC, OPPOSITE SIDES. B
100 YEAR PEAK ELEVATION: XX EMM / SCB
PRECAST SECTION ASTM C-478 EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
REVIEWED BY:
MEETING HS-20 LOADING 45" 10 YEAR PEAK ELEVATION: XX SRV / DPB
(1143 mm)
XX" DRAIN BASIN ISSUED FOR:
SEE PLAN
VARIES
BASE CHAMBER ELEVATION: XX SITE PLAN APPROVAL
A 1 YEAR PEAK ELEVATION: 1069.54 BASE STONE ELEVATION: XX
6" MIN.
9" (230 mm) MIN DATE:
(SEE NOTE 3) 4/20/2026
2.5' SEPARATION
6" (150 mm) MIN
SEE PLAN FOR DIAMETER MC-3500 6"
77" (1956 mm) 12" (300 mm) MIN
END CAP SUBGRADE SOILS (150 mm) MIN DRAWING NAME:
(SEE NOTE 3) **THIS CROSS SECTION DETAIL REPRESENTS
MINIMUM REQUIREMENTS FOR INSTALLATION.
GROUNDWATER ELEVATION: XX
6" MIN. STONE BEDDING
ALL CONCRETE
NOTES: PLEASE SEE THE LAYOUT SHEET(S) FOR
TO LIMITS OF EXCAVATION. PROJECT SPECIFIC REQUIREMENTS.
TO BE 4,000 PSI 1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS"
SAME MATERIAL USED
CHAMBER CLASSIFICATION 45x76 DESIGNATION SS.
6" MIN.
FOR SEWERS.
SOILTIGHT ADAPTER 2. MC-3500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
NOTES:
3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION
FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. REFERENCE STORMTECH DESIGN MANUAL FOR BEARING CAPACITY GUIDANCE.
CONSTRUCTION DETAILS
6" STONE BASE
4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.
1. THE ENTIRE EXTERIOR & INTERIOR SURFACES OF THE CATCH BASIN SHALL BE PAINTED WITH TWO COATS OF 5. REQUIREMENTS FOR HANDLING AND INSTALLATION:
BITUMASTIC COATING. · TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.
2. CATCH BASIN SHALL NOT BE CONNECTED TO ANY SANITARY SEWER. · TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3” (75 mm).
3. PROVIDE FRAMES AND GRATES CONFORMING TO NYSDOT STANDARD SHEETS M655-10R3, M655-6. · TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 500 LBS/FT/%.
SECTION 4. FRAMES TO HAVE APPROPRIATE STRAP ANCHORS. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS.
DRAWING NUMBER:
3 DRAIN BASIN 2 CATCH BASIN 1 MC-3500 CROSS SECTION
4/20/2026 1:17:45 PM
C504 N.T.S. C504 N.T.S. C504 N.T.S.
C504
Page 60 of 359
Page 61
NOT FOR CONSTRUCTION
STANDARD C.I. MANHOLE FRAME & COVER.
SEE SPECIFICATIONS FOR COVER TYPE OPENING SHALL BE CORED & FILLED WITH EPOXY
MORTER SIKADUR 33 BY SIKE OR FLEXOLITH GEL
15" MAX. GRADE RINGS AS NECESSARY BY DURAL TO MAKE WATERTIGHT CONNECTION.
PRECAST OPENINGS ARE ALSO ALLOWED.
24" I.D. PRECAST REINFORCED CONCRETE PROVIDE FLEXIBLE WATERTIGHT CONNECTION.
WITH ECCENTRIC OPENING WILL BE GASKET SHALL MEET ASTM C-923
REQUIRED FOR MANHOLE WITH A 300 Pearl Street, Suite 130
12" MAX. DEPTH GREATER THAN 6'-0" FINISHED GRADE REMOVABLE CAST IRON COVER
LABEL "WATER" (PAINT BLUE)
Buffalo, NY 14202
TAPERED TOP 716-551-6281
ASTM C-748
labellapc.com
SEE NOTE 2 PRECAST REINFORCED CONC.
MANHOLE SECTION 2' 2-PIECE ADJUSTABLE
THROUGH 8' LENGTHS AS CAST IRON VALVE BOX
MINIMUM COVER
STEPS 12" O.C.
REQUIRED WITH A 4" HIGH MAX.
(SEE NOTE 5)
CAST IN PLACE .
TOP SECTION (ASTM C-478) " I.D STONE FULL WIDTH OF
24
COAT INTERIOR AND EXTERIOR TRENCH AROUND
WITH 2 COATS SIKAGARD 62, VALVE BOX
DURALKOTE 312 OR
GATE VALVE
APPROVED EQUIVALENT.
RUBBER GASKETS 12" MIN. WATER MAIN
(ASTM C-443) RETAINER GLAND
(SEE NOTE 6)
15" MAX.
EXP: EXP:
.
I.D
PIPE BEDDING CERTIFICATE OF AUTHORIZATION NUMBER:
3" MIN.
PLAN PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
8" MIN.
COMPACTED SELECT MINIMUM MANHOLE DIAMETERS UNDISTURBED EARTH SOLID CONCRETE BLOCK (MIN.
GEOLOGICAL: 0021659
GRANULAR FILL PIPE DIAMETERS 4" x 8" x 16") 1 REQUIRED AT
# OF NOTES: DIP WATER MAIN
CONNECTIONS 8" 10" 12" 15" 16" 18" 21" 24" 30" 36" 42" & UP It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
5,000 PSI CONCRETE 6" CRUSHER RUN SUBBASE COURSE, 1. VALVE BOXES SHALL BE CENTERED ON VALVE AND SET ON COMPACTED BACKFILL.
UNDISTURBED Sec. 7307, for any person, unless acting under the direction of a licensed
NYSDOT ITEM 304 TYPE 2 SOIL OR ROCK ONE 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' 2. VALVE SHALL NOT SUPPORT VALVE BOX. architect, professional engineer, or land surveyor, to alter an item in any
NOTE: 3. BODY AND BONNET BOLTS SHALL BE STAINLESS STEEL. way. If an item bearing the seal of an architect, engineer, or land surveyor
ELEVATION TWO 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' REQUIRES
4. VALVES SHALL BE OPEN RIGHT. is altered; the altering architect, engineer, or land surveyor shall affix to
SPECIAL
1. PRECAST REINFORCED CONCRETE BASE REQUIRED FOR MANHOLE WITH DEPTH GREATER THAN 4' 4' 4' 4' 4' 4' 5' 5' 5' 5' MANHOLE 5. MINIMUM COVER SHALL BE AS SHOWN ON WATER MAIN TRENCH DETAIL. the item their seal and notation "altered by" followed by their signature and
THREE
6'-0". 6. RETAINER GLANDS NOT REQUIRED AT HYDRANT GUARD VALVES. GUARD VALVES SHALL BE date of such alteration, and a specific description of the alteration.
2. REFER TO TABLE FOUR 4' 4' 4' 5' 5' 5' 5' 5' 5' 5' RESTRAINED WITH ANCHOR PIPE.
3. MANHOLES ARE TO BE FLANGED AND WATER TIGHT IN HIGH WATER TABLE AREAS 7. REFER TO PLANS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
© 2024
2026 LaBella Associates
8 CONCENTRIC STORM MANHOLE 7 MJ GATE VALVE
C505 N.T.S. C505 N.T.S.
MINIMUM MANHOLE DIAMETERS
# OF
CONNECTIONS
PIPE DIAMETERS
HOME LEASING
8" 10" 12" 15" 16" 18" 21" 24" 30" 36" 42" & UP
75 S CLINTON AVE SUITE 700,
2" MIN.
ONE 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' ROCHESTER, NEW YORK 14604
TWO 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' REQUIRES
SPECIAL
THREE 4' 4' 4' 4' 4' 4' 5' 5' 5' 5' MANHOLE
LETTERING FOUR 4' 4' 4' 5' 5' 5' 5' 5' 5' 5'
ON COVER
STANDARD CI MH FRAME & COVER W/ MORTAR LEVELING COURSE, IN WATERTIGHT CI MH FRAME & COVER, SET IN MORTAR 6 WATER QUALITY UNIT
PAVED AREAS WITH GROUND WATER LEVEL GREATER THAN 30" BELOW LEVELING COURSE, IN UNPAVED AREAS WITH GROUND
8" MIN THICK REINF. TOP C505 N.T.S. FINISHED GRADE
FINISHED GRADE. WATER LEVEL LESS THAN 30" BELOW FINISHED GRADE
SLAB WITH 24" DIA. (SANITARY ONLY)
OPENING, SEE NOTE 7
CONCRETE ADJUSTING RINGS WITH
MIN. COVER
FINISHED GRADE
SEE NOTE 3
BITUMASTIC COATING ON INTERIOR SURFACE
FINISHED GRADE PROPOSED OR
MAX.
PRECAST REINF. CONC. MH, ASTM C478, 2'
18"
EXISTING WATER
6' MIN. IN PAVEMENT
THRU 8' HEIGHT AS NECESSARY. 4' MAX PROPOSED OR MAIN
5' MIN. IN LAWN
HEIGHT FOR TOP SECTION. ECCENTRIC CONE PROVIDE WATERTIGHT CONNECTION. TRACER WIRE FOR EXISTING UTILITY
4" MAX. TOP SECTION NOT SHOWN, SEE NOTE 7 PRECAST USE PRECAST RUBBER GASKET. WATER SERVICE PIPE
MAX
RUBBER GASKETS AT JOINTS, (ASTM C443) OPENING
12"
BACKFILL WITH SELECT FILL 45° BEND
WITH BUTYL RESIN STRIP SEALANT, ASTM WYE BRANCH FOR DROPS OVER IN ROADWAY, SIDEWALK, AND
C990, ON INSIDE & OUTSIDE LEDGE BRICK OR PVC 4', TEE DROPS FOR UP TO 4' DRIVEWAY AREAS. USE NATIVE SEPARATION
CAP TO 1/2 ID D=
SOIL IN GRASS AREAS. COMPACT DISTANCE
6"
STEPS 12" O.C. COATING (SEE NOTE 8) PROVIDE VERTICAL
VERTICAL SEE TABLE CL IN A MAXIMUM OF 6" LIFTS. RESTRAINT IN
CL
ZONE
PIPE
CAST IN PLACE 30° BEND WHEN
ACCORDANCE WITH THE
WYE IS USED IN ROCK, BACKFILL PIPE
VERTICAL THRUST
WEST SENECA APARTMENTS
CENTERLINE OF MH
ZONE WITH SAND
BLOCK DETAILS (TYP.)
6"
SEE NOTE 2
VERT. DROP SAME SIZE 2544 CLINTON ST,
COMPACTED 1/2 ID WATER SERVICE
AS THE SEWER ENTERING WEST SENECA, NY 14224
SELECT
THE MH, 8" MIN. NOTES:
GRANULAR FILL CL
"DIM. A"
90° ELBOW CL
PROVIDE FLEXIBLE WATERTIGHT CONNECTION. 1. SEPARATION DISTANCE DIMENSION D, (OUTSIDE EDGE TO OUTSIDE EDGE) SHALL BE PROVIDED AS FOLLOWS:
GAS AND WATER LINES D = 12" MIN. SANITARY FORCEMAINS, STORM SEWERS, AND SANITARY SEWERS D = 18" MIN.
MIN.
GASKET SHALL MEET ASTM C-923 6" MIN. IN ROCK
6"
TRENCH LIMITS 2. ONE STANDARD FULL LENGTH OF WATER MAIN SHALL BE CENTERED UNDER THE SEWER SO THAT BOTH JOINTS WILL BE AS FAR FROM THE SEWER
MAX.
6" MIN. FORMED 12" MIN. IN SOIL
15"
NORMAL PIPE DIA + 24" AS POSSIBLE.
CONCRETE ENCASEMENT 3. MIN, COVER DEPTH - SEE WATER MAIN TRENCH DETAIL.
S
ID
L OF DROP, 3,000 PSI
PIPE BEDDING
5 WATER SERVICE TRENCH 4 TYPICAL WATER MAIN VERTICAL TRANSITION
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
12" MIN.
C505 N.T.S. C505 N.T.S. AT EXISTING PAVEMENT:
INITIAL SAWCUT TYPICAL
UNDISTURBED
3" MIN.
NO: DATE: DESCRIPTION:
MIN.
12" MIN. CRUSHED STONE: EXTEND MIN. 12" EACH SIDE OF TRENCH.
8"
UNDISTURBED GROUND
SUBBASE BEYOND EXTERIOR EDGES OF STRUCTURE EXISTING OR (SEE PAVEMENT JOINT DETAIL Revisions
GROUND 5.5' BURY HYDRANT TO BE
COURSE 4,000 PSI CONC. BENCH. SLOPE PROPOSED SURFACE FOR PAVEMENT RESTORATION)
PROVIDE DROP WHERE DIM. "A" IS EQUAL TO OR GREATER THAN 2' INSTALLED W/ 4-1/2" NOZZLE
TOP OF BENCH @ 1/2"/FT. MIN. FACING THE ROADWAY
SECTION A-A TO DRAIN
FOR SANITARY SEWERS, OR EQUAL TO OR GREATER THAN 5' FOR
STORM SEWERS, UNLESS NOTED OTHERWISE ON PLANS. PROJECT NUMBER:
SECTION A-A GRADE 2241067
(FOR OUTSIDE DROP CONNECTION & WATERTIGHT MH FRAME & COVER) DRAWN BY:
FOR SURFACE RESTORATION
REFER TO ADDITIONAL DETAILS
EMM / SCB
NOTES: VALVE BOX
REVIEWED BY:
12" MIN SRV / DPB
1. IF AN INVERT IS NOT GIVEN, THE CROWN OF THE INFLUENT SEWER(S) SHOULD BE AT THE TRENCH BACKFILL MATERIAL
RADIUS NOT SAME LEVEL OR ABOVE THE CROWN OF THE OUTLET SEWER. EXTENSION ISSUED FOR:
LESS
-ROADWAY SIDEWALK AND ALL DRIVEWAY
SITE PLAN APPROVAL
THAN 1/2 MH ID 2. PIPE CONNECTIONS 6" DIAMETER AND SMALLER MAY BE FIELD CORED. CORED OPENINGS IN SAFE OPERATION
MANHOLE RISER SECTIONS SHALL BE NOT LESS THAN 6" FROM A RISER JOINT. SHEET PILING AREAS: SELECT GRANULAR FILL.
WARNING DATE:
A A (AS REQUIRED) TAPE
3. ALL RISER JOINTS SHALL BE RUBBER RING GASKETS CONFORMING TO ASTM C443 WITH -NON PAVED AREAS: 4/20/2026
FLEXIBLE JOINT SEALER ON OUTSIDE OF JOINTS. BASE SHALL BE COMMON EARTH BACKFILL
#1 WASHED STONE FOR DRAWING NAME:
4. PRECAST BASES, RISER SECTIONS & TOP SLABS SHALL CONFORM WITH ASTM C478, W/ WIDTH OF HYDRANT TRENCH
FLOW
A
HS-20 LOADING AND 30% IMPACT LOADING DESIGN.
NEW FLEXIBLE CONNECTOR
NOTE:
PIPE ZONE
COUPLING PVC x APPLICABLE PIPE BEDDING MATERIAL:
SHAPED 5. CONCRETE FOR STRUCTURE SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF SOLID CONCRETE BLOCK
EXISTING MATERIAL AS 4,000 PSI. (MIN.: 8"x8"x16")
PIPE
O.D.
INVERT NYSDOT 703-0201 50-50 BEDDING AND BACKFILL MATERIAL
NECESSARY WITH STAINLESS WATER MAIN
MIXTURE OF PRIMARY INSTALLED & COMPACTED IN
MAX.
6. INVERT AND BENCH MAY BE CONSTRUCTED WITH BRICK OR POURED CONCRETE. PVC
2'-0"
STEEL SHEAR BAND MAXIMUM 6" LIFTS.
AND/OR ABS PIPE SHALL NOT BE USED WITHIN THE MANHOLE. SIZE 1 & 2
CONSTRUCTION DETAILS
B
7. ECCENTRIC CONE TYPE TOP SECTIONS FOR MANHOLES SHALL BE USED WHERE THE INSIDE IN ROCK, BACKFILL PIPE PIPE DIA. DIM. A DIM. B
SOLID CONCRETE BLOCK 6"x18" (MIN.) ANCHOR PIPE
HEIGHT DIMENSION FROM THE BENCH WALL TO THE BOTTOM OF THE ECCENTRIC SECTION MJ ANCHOR TEE, 6" OUTLET ZONE WITH SAND A A
EXCEEDS 8', OTHERWISE PROVIDE FLAT SLAB TOP SECTIONS. (MIN.: 4"x4"x8") UP TO 18" 1'-0" (MIN.) 6"
EXISTING RCP, CIP 6" MJ GATE VALVE 6" MIN. PIPE 6" MIN.
OR VTP TO REMAIN 8. INSIDE AND OUTSIDE OF MANHOLE TO BE EPOXY COATED TO ONE FOOT ABOVE THE HIGHEST NOTES: IN ROCK O.D. IN ROCK 19" TO 36" 1'-6" (MIN.) 9"
PIPE CROWN. AREAS OUTSIDE OF ONE FOOT ABOVE HIGHEST PIPE CROWN TO RECEIVE TWO
COATS OF BITUMASTIC COATING ON BOTH THE INSIDE AND OUTSIDE OF MANHOLE. 1. HYDRANT TO BE MUELLER SUPER CENTURION 250 - MODEL A-423 OR APPROVED EQUAL. OVER 36" 2'-0" (MIN.) 12"
2. HYDRANT TO BE PAINTED RED.
3. HYDRANT MAIN VALVE SEAT SHALL BE 4 1/2" IN DIAMETER. DRAWING NUMBER:
4. HYDRANT VALVE TO TURN LEFT.
SANITARY MANHOLE HYDRANT ASSEMBLY STORM/SANITARY SEWER TRENCH AND PIPE BEDDING
4/20/2026 1:17:28 PM
3 2 1
C505 N.T.S. C505 N.T.S. C505 N.T.S.
C505
Page 61 of 359
Page 62
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
VALVE BOX COVER SHALL 716-551-6281
BE LABELED "WATER"
FINISHED GRADE
labellapc.com
ROW
CURB STOP
TRACER WIRE RAN UP
OUTSIDE OF BOX, AS
REQUIRED
THREE PIECE CAST IRON
VALVE BOX
APPROVED BACKFILL
EXP: EXP:
MATERIAL
TAP VALVE (FLxMJ)
FUTURE CURB BOX CERTIFICATE OF AUTHORIZATION NUMBER:
5'-0" MIN.
TAPPING SLEEVE PROFESSIONAL ENGINEERING: 0021272
APPROVED BEDDING LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
MATERIAL
FUTURE CONNECTION TO
SOLID CONCRETE
EXISTING SERVICE WITH
BLOCKS (TYP.)
CURB STOP SUPPORTED It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
BY A SOLID CONCRETE Sec. 7307, for any person, unless acting under the direction of a licensed
BLOCK (4"x8"x8") architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
3
4", 1", OR 2" TYPE 'K'
COPPER TUBING © 2024
2026 LaBella Associates
CORPORATION STOP
UNDISTURBED EARTH WATERMAIN
NEW WATERMAIN
SOLID CONCRETE BLOCK
(4"x8"x16") WITH SOLID CONCRETE BLOCK
HARDWOOD SHIMS (4"x8"x16") WITH
HARDWOOD SHIMS
HOME LEASING
NOTES: 75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
1. VALVE SHALL NOT SUPPORT VALVE BOX.
NOTES:
2. TAP VALVE SHALL BE INSTALLED LEVEL AND VERTICALLY PLUMB.
1. AFTER COMPLETION OF TESTING, THE SAMPLE POINT SHALL BE UTILIZED FOR A SERVICE CONNECTION. IF UNABLE TO UTILIZE FOR A SERVICE
REPLACE THE CORPORATION STOP IN PIPE WITH A THREADED BRASS PLUG. 3. VALVE BOX SHALL BE PLUMB TO GRADE, WITH OPERATING NUT CENTERED IN BOX.
5 TEMPORARY BLOW-OFF / SAMPLE POINT 4 TAPPING SLEEVE AND VALVE
C506 ECWA STANDARD DETAIL C506 ECWA STANDARD DETAIL
B B B TRENCH UNDER OR WITHIN 5'-0" OF
ASPHALT OR CONCRETE PAVEMENT,
TRENCH UNDER OTHER AREA DRIVEWAY, SIDEWALK OR PARKING LOT
TRENCH UNDER OR WITHIN 5'-0" OF
ASPHALT OR CONCRETE PAVEMENT, PAYMENT LIMIT
A
A
A
TRENCH UNDER OTHER AREA DRIVEWAY, SIDEWALK OR PARKING LOT FOR ASPHALT
AND CONCRETE
1'-0" RESTORATION
TYP.
WEST SENECA APARTMENTS
A
A
A
PAYMENT LIMIT FOR
EXISTING GRADE ROCK EXCAVATION
INITIAL SAW CUT
2544 CLINTON ST,
AND SELECT FILL 1'-0"
PLAN PLAN PLAN WEST SENECA, NY 14224
FINAL SAW CUT
SOLID CONCRETE SOLID CONCRETE
SOLID CONCRETE EXISTING GRADE EXISTING PAVEMENT
BLOCK (TYP.) BLOCK (TYP.)
BLOCK (TYP.)
C
C
C
4'-0" MIN. COVER (PIPE ≥16")
5'-0" MIN. COVER (PIPE <16")
C
C
C
1'-6" CLEARANCE BETWEEN EXISTING SUITABLE EXCAVATED
UTILITY AND TOP OF WATERMAIN / CASING BACKFILL (PROPERLY
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
(INCREASE TO 3'-0" WHEN CROSSING STORM SELECT BACKFILL COMPACTED) DETECTABLE TAPE IN TRENCH 1'-6"
PROFILE PROFILE PROFILE SEWERS >36") (COMPACTED IN 6" LIFTS) BELOW GRADE (CONNECTED TO
1'-0" (PIPE <16") VALVE BOXES) NO: DATE: DESCRIPTION:
DEAD END HORIZONTAL BEND TEE PIPE BEDDING 2'-0" (PIPE ≥16")
Revisions
TYP. SELECT BACKFILL
(COMPACTED IN 6" LIFTS)
6"
PROJECT NUMBER:
2241067
H
6"
TRACER WIRE (NON-METALLIC PIPE), TAPED
AT 5'-0" INCREMENTS TO THE CROWN OF DRAWN BY:
EMM / SCB
6"
PIPE (CONNECTED TO VALVE BOXES)
WATERMAIN REVIEWED BY:
PLAN SRV / DPB
EPOXY COATED #5 PIPE BEDDING
6"
ISSUED FOR:
REBAR (TYP.) UNDISTURBED EARTH OR
ROCK TRENCH BOTTOM
SITE PLAN APPROVAL
WATERMAIN
DATE:
4/20/2026
D
UNDISTURBED EARTH OR
12" ROCK TRENCH BOTTOM
DRAWING NAME:
W
NOTES: 2" RIGID INSULATION BOARD, PLACED
ON TOP AND EACH SIDE
PROFILE 1. ALL EXISTING UTILITIES MUST BE SUPPORTED WITH APPROPRIATE CHAINS / STRAPS DURING CONSTRUCTION OF THE NEW WATERMAIN.
CONTRACTOR IS REQUIRED TO COORDINATE WITH THE OWNER FOR THEIR PREFERRED SUPPORT REQUIREMENTS.
2'
VERTICAL BEND 2. WHEN CROSSING A SEWER LINE WITH NEW WATERMAIN (AND WITHOUT A CASING PIPE), ONE FULL LENGTH (18'-0" MIN.) SHALL BE USED AT CONSTRUCTION DETAILS
W THE POINT OF CROSSING. THE WATERMAIN SHALL BE PLACED SO THAT BOTH JOINT ENDS ARE AS FAR AS POSSIBLE FROM THE EXISTING
NOTE: SEWER. FROST PROTECTION TRENCH
(COVER <4'-0")
FULL CONCRETE THRUST BLOCKS AS SHOWN ARE REQUIRED WHEN THRUST 3. IF CASING PIPE IS USED, IT SHALL EXTEND 5'-0" BEYOND THE EXISTING PIPE OUTER EDGE IN EACH DIRECTION, AND NO WATERMAIN JOINTS ECWA APPROVAL REQUIRED
RESTRAINT IS NOT PROVIDED BY OTHER MEANS SUCH AS MJ RESTRAINTS *LENGTHS SHOWN ARE MINIMUM REQUIREMENTS OR FITTINGS SHALL BE LOCATED WITHIN 4'-0" FROM THE CASING PIPE EDGE.
DRAWING NUMBER:
3 THRUST BLOCKS 2 PIPE CROSSING DETAIL 1 TYPICAL TRENCH DETAIL
4/20/2026 1:17:25 PM
C506 ECWA STANDARD DETAIL C506 ECWA STANDARD DETAIL C506 ECWA STANDARD DETAIL
C506
Page 62 of 359
Page 63
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2024
2026 LaBella Associates
HOME LEASING
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
4 STANDARD FRAME AND COVER DETAIL 3 CLEANOUT IN PAVEMENT/SIDEWALK DETAIL
C507 ERIE COUNTY SEWER STANDARD DETAIL C507 ERIE COUNTY SEWER STANDARD DETAIL
WEST SENECA APARTMENTS
2544 CLINTON ST,
WEST SENECA, NY 14224
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
NO: DATE: DESCRIPTION:
Revisions
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
CONSTRUCTION DETAILS
DRAWING NUMBER:
4/20/2026 1:17:17 PM
2 CLEANOUT DETAIL FOR SERVICE CONNECTION 1 TYPICAL COMMERCIAL SERVICE WITHOUT BASEMENT DETAIL
C507 ERIE COUNTY SEWER STANDARD DETAIL C507 ERIE COUNTY SEWER STANDARD DETAIL
C507
Page 63 of 359
Page 64
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2024
2026 LaBella Associates
HOME LEASING
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
WEST SENECA APARTMENTS
2544 CLINTON ST,
WEST SENECA, NY 14224
FURNISH AND INSTALL IN LINE FUSES.
BUSSMAN "TRON" WEATHERPROOF FUSES NO: DATE: DESCRIPTION:
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
GASKETED HAND HOLE HOLDERS #HEB-AD WITH "LP-CC" TIME DELAY Revisions
FUSES FOR EACH LUMINAIRE
VARIES - CONCRETE BASE TO BE INSTALLED FLUSH WITH PROJECT NUMBER:
3 PARKING LOT STEEL POLE (MC-01 POLE) FINISHED GRADE OR UP TO 36" EXPOSED. REFER TO SITE
LIGHTING SUMMARY ON UTILITY PLAN(S)
2241067
C508 N.T.S. 36" DRAWN BY:
MAX EMM / SCB
FINISHED GRADE REVIEWED BY:
SRV / DPB
GALVANIZED STEEL 'J' BOLTS (TYP. OF 4) ISSUED FOR:
3" MIN SITE PLAN APPROVAL
COVER
1" PVC SCHEDULE 80 CONDUIT DATE:
24" MIN
(TYP. OF 2) 4/20/2026
66" MIN
DRAWING NAME:
#6 CU GROUND WIRE 3/4" PVC SCHEDULE 80 CONDUIT FOR GROUND
ROD. CONNECTION AS REQUIRED.
EXOTHERMIC WELD
6#6 VERTICAL RODS AND
#3 TIES @ 12" O.C.
1/2"Øx8' CU DRIVEN
24"Ø CONSTRUCTION DETAILS
GROUND ROD.
PVC CONDUIT FITTING
DRAWING NUMBER:
2 TYPICAL SITE LIGHTING POLE BASE DETAIL 1 LIGHTING FIXTURES / PHOTO METRICS
4/20/2026 1:17:42 PM
C508 N.T.S. C508 N.T.S.
C508
Page 64 of 359
Page 65
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
WOVEN TREE STAKING MATERIAL (DEEPROOT ARBORTIE OR
APPROVED EQUAL, TWO TIES PER TREE, SPREAD 180° APART).
LOCATE 6" FROM TOP OF STAKE UP TO LOWEST BRANCHES.
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
TWO 3" DIAMETER X 8' CEDAR STAKE
ABOVE GROUND TO LOWEST BRANCHES GEOLOGICAL: 0021659
GROUND LINE TO BE SAME AS AT THE
1 NURSERY
2 ROOT BALL DIAMETER
GROUND LINE TO BE THE SAME AS AT THE NURSERY. It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
REMOVE ALL TWINE & STRAPS. CUT AND REMOVE TOP 1/3 OF Sec. 7307, for any person, unless acting under the direction of a licensed
BURLAP. WIRE CAGE AND ALL SYNTHETIC MATERIALS SHALL PRUNE ONLY DEAD, BROKEN OR
architect, professional engineer, or land surveyor, to alter an item in any
BE TOTALLY REMOVED. DAMAGED BRANCHES
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
SET TOP OF ROOT BALL FLUSH TO GRADE 3" SHREDDED HARDWOOD MULCH - EXTEND date of such alteration, and a specific description of the alteration.
OVER SAUCER BERM
3" DEPTH SHREDDED HARDWOOD MULCH; KEEP
6" FROM TRUNK OF TREE TO MAINTAIN A VISIBLE ROOT CONSTRUCT EARTH SAUCER WITH 4" HIGH
FLARE. BERM © 2024
2026 LaBella Associates
CONSTRUCT EARTH SAUCER WITH 4" HIGH BERM-FLOOD
WITH WATER TWICE IN FIRST 24 HRS. REMOVE ALL TWINE & STRAPS. CUT AND REMOVE BURLAP
~
AND WIRE BASKET FROM TOP 1/3 OF ROOTBALL. REMOVE
ALL SYNTHETIC MATERIALS AND TAGS.
BREAK UP OR LOOSEN
6"
MIN
BACKFILL WITH PLANTING SOIL MIXTURE IN 9"
HOME LEASING
SUBSOIL LAYERS. WATER EACH LAYER UNTIL SETTLED. DO 75 S CLINTON AVE SUITE 700,
BACKFILL WITH PLANTING SOIL MIXTURE
2X ROOT BALL DIAMETER
IN 9" LAYERS. WATER EACH LAYER UNTIL SETTLED. DO NOTE: NOT TAMP. ROCHESTER, NEW YORK 14604
NOT TAMP. 1. PROVIDE A CONTINUOUS MULCHED PLANTING BED FOR
NOTE: ALL SHRUB PLANTINGS.
1. REMOVE STAKES AND GUYS AT THE END OF BREAK UP OR LOOSEN SUBSOIL WITH A PICK 2. DO NOT OVERSEED SHRUBS IN PLANTING BEDS OR
THE FIRST GROWING SEASON AFTER PLANTING PITS IN MAINTAINED LAWN AREAS
2. PROVIDE A 6' DIA. MULCHED PLANTING BED AROUND EACH TREE.
3. DO NOT OVERSEED TREE PLANTING PITS IN MAINTAINED LAWN AREAS.
DECIDUOUS TREE PLANTING 3 SHRUB PLANTING
4
L501 N.T.S.
L501 N.T.S.
2" DEPTH MULCH
WEST SENECA APARTMENTS
2544 CLINTON ST,
WOVEN TREE STAKING MATERIAL (DEEPROOT WEST SENECA, NY 14224
SUBSOIL TO BE 18" DEEP BED OF PLANTING
ARBORTIE OR APPROVED EQUAL)
BROKEN WITH SOIL MIXTURE
A PICK AXE
3" DIAMETER X 8' CEDAR OR
PRESSURE TREATED STAKE, TWO NOTE: GROUND COVERS SHALL BE POT OR CONTAINER GROWN.
OPPOSITE.
SET TOP OF ROOT BALL FLUSH TO GROUNDCOVER SECTION
GRADE
GROUND LINE TO BE THE SAME AS
AT THE NURSERY. REMOVE ALL PLANTS SHALL BE SET AT THE
TWINE & STRAPS. CUT AND REMOVE 2" DEPTH MULCH;
SAME GROUND LINE AS IN THE
TOP 1/3 OF BURLAP. WIRE CAGE AND ALL SYNTHETIC DO NOT MOUND
CONTAINER
MATERIALS SHALL BE TOTALLY REMOVED. MULCH OVER ROOT
NO: DATE: DESCRIPTION:
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
COLLAR
PLANTING SOIL FIRM SOIL AROUND Revisions
3" MIN. SHREDDED HARDWOOD MULCH - ROOT BALL WITH HANDS
KEEP 6" FROM TRUNK OF TREE, TO MAINTAIN VISIBLE MIXTURE
ROOT FLARE
PROJECT NUMBER:
SUBSOIL
2241067
DRAWN BY:
CONSTRUCT EARTH SAUCER WITH 4" HIGH EMM / SCB
BERM-FLOOD WITH WATER TWICE IN FIRST 24 PERENNIAL SECTION
HRS. REVIEWED BY:
SRV / DPB
BACKFILL WITH PLANTING SOIL MIXTURE IN 9" LAYERS.
WATER EACH LAYER UNTIL SETTLED. DO NOT TAMP. NOTES: ISSUED FOR:
1. PROVIDE 18" DEPTH PLANTING SOIL MIX , ADD SITE PLAN APPROVAL
BREAK SUBSOIL WITH A PICK FERTILIZER WHEN MIXING. DO NOT COMPACT AFTER PLANTING.
2X ROOT BALL DIA.
2. WATER THOROUGHLY AFTER PLANTING. DATE:
4/20/2026
3. PROVIDE WELL DRAINING SUBSOIL WHEN SOIL IS HEAVY
NOTE: OR COMPACTED. DRAWING NAME:
1. REMOVE STAKES AND GUYS AT THE END OF
4. PLANTS SHALL BE REMOVED FROM ALL CONTAINERS WHEN
THE FIRST GROWING SEASON AFTER PLANTING
PLANTED, UNLESS OTHERWISE STATED IN THE PLANT SCHEDULE.
2. PROVIDE A 6' DIA. MULCHED PLANTING BED AROUND EACH TREE.
3. DO NOT OVERSEED TREE PLANTING PITS IN MAINTAINED LAWN AREAS.
EVERGREEN TREE PLANTING PERENNIAL - GROUNDCOVER PLANTING
2 1 LANDSCAPE DETAILS
L501 N.T.S. L501 N.T.S.
DRAWING NUMBER:
4/20/2026 1:17:53 PM
L501
Page 65 of 359
Page 66
FIBER CEMENT PANEL - BRICK -
HARDIE "COBBLESTONE" WATSONTOWN "ELK"
FIBER CEMENT BOARD
AND BATTEN -
HARDIE "IRON GRAY"
ALTERNATE MATERIAL: ALTERNATE MATERIAL:
FIBER CEMENT SIDING FIBER CEMENT SIDING
- HARDIE "BOOTHBAY BLUE" - HARDIE "MONTEREY TAUPE"
VINYL SIDING - VYTEC VINYL SIDING - VTEC
PRESTIGE "LAKESHORE BLUE" PRESTIGE "SPRING MEADOW"
3D View and Material Palette
Home Leasing - West Seneca
Page 66 of 359
Page 67
T.O. PARAPET E9 E3
+37' - 0" ELEVATION KEY NOTES
E8
T.O. ROOF NO. DESCRIPTION
+32' - 0" E1 MASONRY VENEER. COLOR AND PATTERN TBD.
E2 FIBER CEMENT PANEL SYSTEM. COLOR TBD
E11 E3 FIBER CEMENT BOARD AND BATTEN SYSTEM. COLOR TBD
LEVEL 3 VINYL LAP SIDING, 7" EXPOSURE. COLOR TBD. (ALTERNATE MATERIAL: FIBER CEMENT
E2 E4
+22' - 0" SIDING)
E5 ALUMINUM STOREFRONT SYSTEM. COLOR AND FINISH TBD.
E6 EXTERIOR WALL SCONCE. FIXTURE TBD.
LEVEL 2
E7 FRAMED CANOPY W/ GFRC CORNICE
+12' - 0" E7
E8 ROOF PARAPET W/ GFRC CORNICE
E4 E9 6" TRIM BOARD
E10 12" TRIM BOARD AND ALUMINUM PARAPET COPING
LEVEL 1
E11 VINYL DOUBLE HUNG WINDOW. COLOR AND TRIM TBD
+0' - 0"
E5 E1
EXTERIOR ELEVATION - WEST
4 1/16" = 1'-0"
T.O. PARAPET E9 E3 E8 E2 E10
+37' - 0"
T.O. ROOF
+32' - 0"
E11
LEVEL 3
+22' - 0"
LEVEL 2
+12' - 0"
E4
LEVEL 1
+0' - 0"
E4 E1 E4
3 EXTERIOR
1/16" = 1'-0"
ELEVATION - NORTH
T.O. PARAPET
E2 E9 E3 E8
+37' - 0"
T.O. ROOF
+32' - 0"
E11
LEVEL 3
+22' - 0"
E2
LEVEL 2
+12' - 0"
E4
LEVEL 1
+0' - 0"
E1 E4 E4 E1
EXTERIOR ELEVATION - EAST
2 1/16" = 1'-0"
T.O. PARAPET E3 E2 E8 E9 E1
+37' - 0"
T.O. ROOF
+32' - 0"
E11
LEVEL 3
+22' - 0"
LEVEL 2
E4
+12' - 0"
LEVEL 1
+0' - 0"
E4 E4 E7 E5 E6 E1
1 EXTERIOR
1/16" = 1'-0"
ELEVATION - SOUTH
Exterior Elevations
Home Leasing - West Seneca
Page 67 of 359
Page 68
A-3
3
3 BR
UNIT
3 BR W D
UNIT
DEAD END
15' - 1"
W D
STAIR 2
190 SF
UP
3-STORY BLDG - UNIT COUNTS EXISTING MANSION - UNIT COUNTS
1 BR = 15 UNITS 1 BR = 9 UNITS
2 BR = 25 UNITS 2 BR = 4 UNIT
3 BR = 20 UNITS 3 BR = 2 UNITS
W D
MAINT. SHOP EQUIP STOR.
397 SF 332 SF
60 UNITS TOTAL 15 UNITS TOTAL
SITE TOTAL: 75
3 BR
1 BR: 24 UNITS
2 BR: 29 UNITS UNIT
3 BR: 22 UNITS
COMPACTOR
RECYCLING 237 SF
102 SF
COMMUNITY ROOM MECH
848 SF 32 SF
2 A-3
TLT
56 SF
FITNESS
536 SF
TLT
56 SF
ELEV
122 SF
3 BR ELEC / WATER
UNIT D W
2 BR 1 BR 2 BR W D D W
2 BR 1 BR 2 BR W D
DATA
93 SF
722 SF
UNIT UNIT UNIT UNIT UNIT UNIT
A-3 4
JAN. MECH
D W
116 SF 116 SF
19' - 8 3/4" STOR.
DEAD END 49 SF
TLT
MAIL
D W
UP 68 SF
143 SF
OFFICE RECEPTION
167 SF 396 SF
3 BR STAIR 1
LOBBY
356 SF
UNIT 189 SF D W W D D W W D
1 BR 2 BR 2 BR 3 BR 2 BR DATA MECH
CONFERENCE
UNIT UNIT UNIT UNIT UNIT PKGS
203 SF FILES WORK RM
111 SF MECH/ 137 SF
VEST. STOR.
68 SF 38 SF
N
1
A-3
First Floor Plan
Home Leasing - West Seneca
Page 68 of 359
Page 69
A-3
3
3 BR
UNIT
3 BR W D
UNIT
W D
STAIR 2 DN
190 SF
UP
W D
2 BR
3 BR UNIT
UNIT
TRASH CHUTE /
RECYCLING
120 SF
2 BR
UNIT
2 A-3
D W
1 BR
UNIT
3 BR DATA
1 BR
UNIT D W
2 BR 1 BR 2 BR W D D W
2 BR 1 BR 2 BR W D
93 SF
UNIT
UNIT UNIT UNIT UNIT UNIT UNIT
A-3 4
D W
JAN. MECH
116 SF 116 SF
STAIR 1
D W
D W
189 SF
UP
3 BR DN
3 BR
UNIT D W W D D W W D
UNIT
1 BR 2 BR 2 BR 3 BR 2 BR 1 BR
UNIT UNIT UNIT UNIT UNIT UNIT
N
1
A-3
Second and Third Floor Plans
Home Leasing - West Seneca
Page 69 of 359
Page 70
3 BR
UNIT
1 BR 2 BR
UNIT UNIT
LAUNDRY
216 SF
1 BR
MAINTENANCE OFFICE
UNIT
235 SF
1 BR 1 BR
UNIT UNIT
3 BR
UNIT
1 BR
UNIT
SECOND FLOOR PLAN
2 1/16" = 1'-0"
2 BR
UNIT
DN UP
UP
1 BR 1 BR
UNIT UNIT
LAUNDRY
184 SF
2 BR
FITNESS 2 BR
UNIT 1 BR UP
309 SF UNIT
UNIT
DN
3 BR DN LOBBY/MAIL
OFFICE
UNIT 257 SF
142 SF
CONCEPTUAL RENDERING CONF. RM
OFFICE
206 SF
311 SF
ENTRY
169 SF
N
FIRST FLOOR PLAN
1 1/16" = 1'-0"
Existing Building Plans and Rendering
Home Leasing - West Seneca
Page 70 of 359
Page 71
LINE LEGEND SYMBOL LEGEND I-90
CAYUGA CREEK ROAD
SECTION/PARCEL BOUNDARY D DRAINAGE MANHOLE E ELECTRIC MANHOLE
MIN. BUILDING SETBACK EM
CENTER LINE INLET DRAINAGE MANHOLE ELECTRIC METER
EK
A CRE
EXIST. EASEMENT LINE CATCH BASIN T TELEPHONE MANHOLE CAYUG
EXIST. RIGHT-OF-WAY LINE
EXIST. EDGE OF PAVEMENT
END SECTION TP TELEPHONE PEDESTAL
WV H
END OF PIPE PROJECT
D
Y
EXISTING WATER MAIN, VALVE, & HYDRANT.
1720'±
W PEDESTRIAN POLE
EXISTING SANITARY SEWER, & MANHOLE.
S MANHOLE TRAF.
LOCATION
HARLEM ROAD
MH
EXISTING DRAINAGE SEWER, FIELD INLET, SIG. TRAFFIC CONTROL CABINET
D CAB.
INLET MANHOLE, MANHOLE, & END SECTION. S SANITARY MANHOLE FRENCH ROAD
8 LAMP POST
57 57 OH OH EXISTING OVERHEAD UTILITIES
8 C.O. CLEAN OUT
LIGHT POLE
T T EXISTING TELEPHONE GV
GAS VALVE UTILITY POLE WITH LIGHT
UG UG EXISTING UNDERGROUND UTILITIES
GS
UNION ROAD
579 583
C
G G EXISTING GAS GAS SERVICE FLAG
LI
580 5
81 FLAG POLE
N
GM POLE
TO
E E EXISTING ELECTRIC
582 583 GAS METER
N
584 MAILBOX
ST
585
EXISTING GUARD RAIL SV
R
MB
BU
586
M
583
EE
58 SPRINKLER VALVE
IN
585 0
T
BOLLARD
FF
582 587 TREE,HEDGE,EDGE OF WOODS
ER
AL
SH
AL
581
SPRINKLER HEAD
O
8 POST
SP
580
57 EXISTING SWALE
CR
RI
WV
NG
EE
5 88 X , , BARBED WIRE,STOCKADE,CHAIN LINKED FENCE WATER VALVE
SIGN
S
K
RO
58 WS
5 410 EXISTING CONTOUR
AD
' WATER SERVICE
589
" E 71.00 590
x 420.4 EXISTING SPOT ELEVATION @ X
SIGN
9
2159'1 1
HYDRANT
SIGN
N76°
TO
592 CONCRETE PAD/ CONCRETE SIDEWALK
P
WM
OF
WATER METER
580
TURNING ARROW INDIAN CHURCH ROAD
BA
7
NK
58
WELL
HANDICAP
CA
9 '
BORE
.3 STOP BAR
5
STOP
YU
58
9
16 C CABLE TV PEDESTAL TREE DECIDUOUS
S3
LOCATION SKETCH
GA
"E
2°
SIGNAL POLE TREE CONIFEROUS
41
14
NOT TO SCALE
5'
CR
5 BUSH
'
UTILITY POLE
12
°
EE
45
"E
GUY WIRE AC AIR CONDITIONING UNIT
N
K
N SAN
20
PULL BOX SANITARY UTILITY LATH
6
6.2
58
593 ELECTRIC PULL BOX G GAS UTILITY LATH
2'
5 ELEC.
58
RIM=593.19
(NO ACCESS)
S
TELEPHONE PULL BOX
W WATER UTILITY LATH
UTILITY INFORMATION
TELE. T TELEPHONE UTILITY LATH
58
5
TR TRAFFIC PULL BOX UTILITY INFORMATION PER UFPO DESIGN TICKET # 10313-000-071-00
594 E ELECTRIC UTILITY LATH
GRID
57 DATED OCTOBER 31, 2023
9
T TRANSFORMER C CABLE UTILITY LATH
595 1. BUCKEYE PIPELINE COMPANY 610-904-4475
586
N00° 32' 17"E 174.62'
2
59
2. CHARTER COM NORTHEAST WESTERN NY 317-575-7800 x2
RIM=594.92
(NO ACCESS)
593 3. ERIE COUNTY DIVISION OF SEWER MANAGEMENT 716-858-8760
587
57
8
S
S4
4. ERIE COUNTY WATER AUTHORITY 716-685-8207
3°
42
BO
5. NATIONAL FUEL GAS | BUFFALO - NFG101 716-857-7431
6
'1
59 TT
OM
594
7"
OF 6. NYS THRUWAY AUTHORITY | BUFFALO 716-635-6224
BA
E
GATE NK
17
7. NYSEG LANCASTER ELECTRIC 585-484-5115
8.
00
8. TOWN OF CHEEKTOWAGA 716-686-3450
'
7
59
579
BO 9. TOWN OF WEST SENECA HIGHWAY 716-674-5600 x261
T TO
M
OF
57 BA 10. VERIZON | BUFFALO 315-937-2515
8 N
8 59 K
587
CE
S5 58
0 NT
ER
9° LIN
95
2 9' 58
5
E
OF
'±
CR
5
13 E
"E EK
74
59
'
0
580
585
59 .72
599
58
11
59
139 0
6
5
59
7.8
4
TO
596 59
7 PO
FB 5'
AN
599
58 40 K
.8'
.7'
6 8
E
59
20
38"
FE
NC
599 ONE STORY 6.9 E
' 1" PIN
600 FRAME GARAGE
31'
APPROXIMATE LOCATION 0.4' ABOVE
FF=599.29'
EASEMENT TO ERIE COUNTY GRADE
°
SEWER DISTRICT #4
N22
PER REF. 4 TWO STORY
0
FRAME BARN 60
FF=600.25'
59
7"
.8'
.4'
30
13"
6
58
20" 600
N CE
ONE STORY
FE
FRAME BUILDING
7
IC
58
E
FF=600.15'
T
599
NC
AS
6" PVC
FE
PL
S
D
'
D
RIM=602.51
.98
OO
AN
48" 32" 599 (NO ACCESS)
W
C
PV
OD
2
4'
CONCRETE 4"
18
WO
596.80
580
585
E 0
5'
0" 59
STONE / 5
6.9 N/F
CONCRETE 59
CLINTON STREET REALTY
GRILL
'1
14" HOLDINGS
27
5
TG=598.70 T.A.# 124.00-2-5
59
2544 CLINTON STREET
8
6°
57
9
LIBER 11299 PAGE 9093
59
N3
ASPHALT AREA = 9.402 ACRES TO
TIE LINE
AREA = 12.733 ACRES TO
8
59
C.O. 36" 8" CENTERLINE OF CREEK 0
36" 60
ASPHALT
4"
C.O.
18"
6
59
30" 600
8"
8' 32"
T1
1
EK
0
7.
T2
24"
60
LO
11
LO
BA
NK
R E DEAD
8
59
O
F
C " E 59
7 10"
GA
M CONCRETE PAD
O
TT
37 W/ HVAC UNITS 15" STUMP
BO '
Y U 0 32"
7' HIGH
°5
CA
10"
9 TWO STORY
45 NK 59 10" STUMP
EK
K 24" BLOCK/FRAME 7' HIGH
B AN N O F BA BUILDING 600
E
RE
OF P 36" 10"
DOWNSPOUT
LIN WOODS
M TO 32"
TO DOWNSPOUT
FC
T 4"
BO
N60° 14' 10"W 1'
TIE
.4
EO
97 T GM FF=600.70'
69'± FF=602.53'
TO
8" 16"
2"E
LIN
T 30" 34"
' 5 15" 599
16
0'
ER
6
5
°
3.4
59
59
58 597
N/F
NT
K
N
T
EE
8"
73
CLINTON STREET REALTY
4
T 16"
59
593
30"
CR
8 15" HOLDINGS
CE
59
580 36"
OF
T.A.# 124.00-2-8
59
MB 13" 21
NE
6.7 2602 CLINTON STREET
2
'
1.3
O
T '
LI
5 LIBER 11299 PAGE 9093
58
ER
CONCRETE W/
19
FLAG 13" 598
'±T
15"
NT
0 POLE OVERHANG
577 59 48" 15"
CE
7
5 ORIGINAL
80
59 T ASPHALT
N18° 32' 09"E 48"
NORTHERLY RIGHT 21
7
8"
E 4.1
57
OF WAY LINE OF T ET '
VT
WV 49.86' CLINTON STREET NC
R
P
OH
CO 598
CONCRETE WALL TRUCK ROUTE W/ H
75
WV 597
35 MPH
36" MILE MARKER x.
'W
W 354/5301/2009 1.4
'
5.8
S69
59
APPROXIMATE LOCATION
19
T 1
4.0
APPROPRIATION OF LANDS ° 30 3' STONE WALL 10' WIDE EASEMENT TO 4.3 599
T 59
3
FOR HIGHWAY PURPOSES
W ' 45 BOX BEAM NEW YORK STATE
595
LIBER 9006 PAGE 213 "E GUIDE RAIL ELECTRIC & GAS
600 CORPORATION TG=595.23
W 599 598 NYSEG 596
PER REF. 4
"E
494 T
9
60
59
W
303
2
LO 597
50
NO #
LO T 1
60
1
T3
4
.36' 598
'
45
28" 24"
W W
9°
599
24"
N2
600 G 24"
W
GATE
W GATE
OH
FE
NC
6.2 E ONE STORY
6' CHAIN '
WV 3' STONE WALL 1-1/4" FRAME GARAGE
12" LINK FENCE PIPE
2.6 FF=601.19'
OH W
CL W N6 20" '
S60° 14' 10"E
0°
OH IN TO 14 19" 0 88.00'
.7'
'1 60 2.5
.3'
'
15
494/38
NS 0"W
20
G 15"
TR G 20" 22
.5'
WOOD
W
E 601 W
0'
OH GAZEBO
(W ET (
60
18"
D
Y
H
1.0
0
#2561 22"
AP
G IDT N.Y PR
O
3.0
'
13
X
HV .S.
'
IM
0
AT TWO STORY
OH
R
1.0
EL
AR
W I O OC G
FRAME HOUSE
16
.5'
25"
APP G ES) UT AT W
IO
25
FF=605.33'
CONCRETE
13
'
ROX N1
E
9.7
IMA 2" 7.6 1 STEPS 600
T E LO
CAT
OH W
354 AT
ER 2'
60 4.0
'
) N/F
.6'
ION
'
OH
6.6
MA
0"W
4" G
46
AS G IN 3.0 2.0 CLINTON STREET
MAI AP 602 G ' '
N P GM 48" REALTY HOLDINGS
W ROX W WA T.A.# 124.00-2-7
.4'
OH 13"
'5
IM L
AT 1.0 L 22
30
EL ' .5' 2574 CLINTON STREET
45
G OC 28" STUMP LIBER 11299 PAGE 9093
AT
IO
N6 2' HIGH AREA = 0.265 ACRES
.1'
9°
1.8 L
L
NYSEG "W 603
16
WA
'
AT G
S2
40
W ER M
SURVEY NOTES
602
W
AIN 34"
G OH
COVERED
12" 01
STOOP 6 1. TOPOGRAPHY SHOWN FROM A FIELD SURVEY BY COSTICH ENGINEERING
ON 12/8/2023 HORIZONTAL AND VERTICAL DATA OBTAINED THROUGH
G
604
MB G6
0 3
N60° 14' 10"W NYSDOT CORS NETWORK REFERENCED TO THE FOLLOWING MONUMENT
W W
G
AP
PR
88.00'
OX
G IM HAMBURG CORS STATION
AT
EL -LATITUDE: 42-43-02.66326 (N) NAD 83 (CORS)
OC
AT -LONGITUDE: 078-50-47.27326 (W)
G IO
W W N2
"G
AS
-ELLIP HEIGHT: 212.494 METERS NAVD 88 (CORS)
MA
IN
G
W W
W W
SITE DATA CERTIFICATION
REFERENCES
1. EXISTING ZONING: M-1 (MANUFACTURING DISTRICT) WE, COSTICH ENGINEERING, D.P.C., HEREBY CERTIFY T0:
1. DEEDS AS SHOWN ON FILE AT THE ERIE COUNTY CLERK'S OFFICE.
2. BULK REQUIREMENTS:
2. MAP OF THE EBENEZER LANDS FILED IN THE ERIE COUNTY CLERK'S
REQUIRED
OFFICE UNDER COVER NO. 58.
MIN. LOT AREA (SF) 20.,000
3. NEW YORK STATE DEPARTMENT OF TRANSPORTATION ACQUISITION MAP,
MAX LOT COVERAGE N/A
CLINTON STREET, PART I, S.H. NO. 371, ERIE COUNTY, MAP NO. 44, PARCEL
NO. 37., FILED AT LIBER 9006 OF DEEDS, PAGE 213.
MIN. LOT WIDTH (FT) 100
4. MAP ENTITLED "BOUNDARY SURVEY OF 2544 CLINTON STREET",
FLOOD NOTE: MAX. BUILDING HEIGHT (FT) 40 THIS MAP WAS PREPARED FROM NOTES OF AN INSTRUMENT SURVEY COMPLETED ON
PREPARED BY NUSSBAUMER & CLARKE, INC., HAVING JOB NO 15J2-0079,
By graphic plotting only, this property is in Zone X & Zone AE of the Flood DRAWING NO. SB-2535, DATED 2/4/2015. DECEMBER 8, 2023 AND FROM THE REFERENCE(S) LISTED HEREON. NO SEARCH OF
MIN. FRONT YARD SETBACK (FT) 50 RECORDS, OTHER THAN THOSE REFERENCED, WAS MADE FOR EASEMENTS OR
Insurance Rate Map No. 36029C0331H Community Panel No. 360262, Town of
West Seneca, which bears an effective date of 6/7/2019 and Zone X & Zone AE 5. MAP ENTITLED "BOUNDARY SURVEY OF 2602 CLINTON STREET", ENCUMBRANCES AFFECTING THIS PARCEL.
MIN. SIDE YARD SETBACK (FT) 50
of the Flood Insurance Rate Map No. 36029C0332H Community Panel No. PREPARED BY NUSSBAUMER & CLARKE, INC., HAVING JOB NO 15J2-0080,
360262, Town of West Seneca, which bears an effective date of 6/7/2019, No DRAWING NO. SB-2534, DATED 2/4/2015.
field surveying was performed to determine this zone and an elevation certificate
may be needed to verify this determination or apply for a variance from the Federal
MIN. REAR YARD SETBACK (FT) 10
By:
PRELIMINARY Date:
Emergency Management Agency.
Daniel T. Hickok, N.Y.S. L.S., No. 050449
PROJECT MANAGER TITLE OF PROJECT
EXISTING UTILITIES (LOCATION, SIZES AND INVERTS) SHOWN ON THE
PLANS ARE APPROXIMATE AND ARE NOT CERTIFIED AS TO THE
COPYRIGHT © 2023
OF NEW
D.T.H. Civil 2544 & 2574 CLINTON STREET PROPERTIES
COSTICH ENGINEERING, D.P.C. Y
TE WEST SENECA
ACCURACY OF THEIR LOCATION OR COMPLETENESS. THE DRAWN BY
GRAPHIC SCALE L T. H I Engineering
O OK
CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT IE K.E.L.
A
TITLE OF DRAWING
RK
C
ST
N
K
LOCATIONS AND DEPTHS OF ALL UTILITIES AND STRUCTURES IN THE IT IS A VIOLATION OF LAW FOR ANY Land EXISTING FEATURES
DA
50 0 25 50 100 200 BOUNDARY
PERSON, UNLESS ACTING UNDER THE
PATH OF, OR CLOSELY PARALLEL TO, OR UNDER, THE PROPOSED DIRECTION OF A LICENSED PROFESSIONAL G.M.S. Surveying
CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ENGINEER, LAND SURVEYOR, ARCHITECT
OR LANDSCAPE ARCHITECT, TO ALTER ANY TOPO/BASE LOCATION OF PROJECT TAX PARCEL NO.'S 124.00-2-5 & 124.00-2-7
DELAYS OR DAMAGES OCCURRING AS A RESULT OF INCORRECTLY Landscape
ITEM ON THIS DOCUMENT IN ANY WAY . M.G. PART OF LOTS 1,2, & 34 OF THE EBENEZER LANDS,
LOCATED UTILITIES. IT IS THE CONTRACTORS RESPONSIBILITY TO
R
ANY LICENSEE WHO ALTERS THIS Architecture LOT 123, TOWNSHIP 10, RANGE 7, BUFFALO CREEK RESERVATION,
LI C
NOTIFY THE VARIOUS UTILITY OWNERS IN AMPLE TIME FOR THEM TO ( IN FEET ) L.
YO
DOCUMENT IS REQUIRED BY LAW TO AFFIX S. DATE TOWN OF WEST SENECA, COUNTY OF ERIE, STATE OF NEW YORK
9
4
1 inch = 50 ft. NO. 0 5 0 4
EN
LOCATE AND MARK THEIR FACILITIES. THE CONTRACTOR SHALL ALSO HIS/HER SEAL AND THE NOTATION 12/18/2023
E
"ALTERED BY", FOLLOWED BY HIS/HER S V Costich CLIENT
LABELLA ASSOCIATES DWG. # 9263
NOTIFY UNDERGROUND UTILITY LOCATION SERVICE AT LEAST 48 ED R 217 Lake Avenue
SU
HOURS IN ADVANCE OF COMMENCING ANY WORK.
NO. DATE REVISION BY CHKD. APVLS.
SIGNATURE AND SPECIFIC DESCRIPTION OF
THE ALTERATION, TO THE DOCUMENT. L AND SCALE
1"=50' Engineering
Rochester, NY 14608
(585) 458-3020
300 STATE STREET - SUITE 201
ROCHESTER, NEW YORK 14614
VA100
SHEET 1 OF 1
Page 71 of 359
Page 72
Prepared For:
Home Leasing, LLC
75 South Clinton Avenue, Suite 700
Rochester, NY 14604
Submitted by:
LaBella Associates
300 State Street, Suite 201
Rochester, NY 14614
(716) 551-6281
ENGINEERING REPORT FOR WEST SENECA
Date: October 2024
Last Revised: April 2026
LBA Project No. 2241067
Page 72 of 359
Page 73
West Seneca Sewer Report | Page 1
Table of Contents
Section 1 – Introduction .................................................................................................................... 2
Section 2 – General.............................................................................................................................. 2
Section 3 – Proposed Sanitary Facilities .............................................................................. 2
Section 4 – Propsoed Stormwater Facilities ..................................................................... 6
Section 5 – Proposed Water Facilities ................................................................................... 9
Appendices
Attachment A – Site Location Map
Page 73 of 359
Page 74
West Seneca Sewer Report | Page 2
Section 1 – Introduction
Home Leasing is proposing the development of a new affordable housing complex on a +/-
12.7-acre parcel in West Seneca, NY. Home Leasing is also seeking Site Plan Approval from
West Seneca and HCR 9% funding from New York State. The proposed development
includes 75 units split between a repurposing of the existing mansion on site to and a new 3-
story apartment building in the rear of the property. The project includes a private road
accessing the apartments, parking, sidewalks, playground, landscaping and stormwater
management facilities.
1.1 Site Location
The 12.7-acre site is nestled between Clinton Street (State Route 354) to the south and Cayuga
Creek to the North and West. Within a quarter mile of the development there are multiple
commercial uses and Interstate 90. The neighborhood is predominately comprised of
agricultural land, single- and two-family homes and industrial/manufacturing facilities. See
appendix A for location site map.
Section 2 – General
2.1 Existing Site Conditions
The existing site includes the above-mentioned mansion, two barns, a stone wall along
Clinton Street and parking areas. The barns and parking areas will be demolished, while the
existing stone wall will remain, with the entrance being widened to allow for emergency
vehicle access to the site.
The site topography is relatively flat with elevations generally ranging from 600 to 580. Storm
water runoff from site drains either via sheet flow directly to Cayuga Street, or to drainage
inlets that drain to Cayuga Creek. The existing drainage system on site is minimal and consists
of a small swale and dry detention basis which collects and re-directs off-site drainage from
the east. Drainage is then conveyed to Cayuga Creek via storm pipes and open drainage
swales.
2.2 Proposed Site Conditions
The proposed development includes 75 units split between a repurposing of the existing
mansion on site to now include apartments and one apartment building in the rear of the
property.
Project Data:
Facility Type: Affordable Housing
No. of Buildings: 2 (Including one existing)
Section 3 – Proposed Sanitary Facilities
3.1 Building Utility Services – Sanitary
The following summarizes the sanitary sewer service sizes for each building.
Page 74 of 359
Page 75
West Seneca Sewer Report | Page 3
Table 1: Sanitary Lateral Sizes
Sanitary Lateral
Building # Description
Size
1 Existing Mansion 6”
2 Proposed Building 6”
3.2 Sanitary Sewer
The project requires a Down Stream Sewer Capacity analysis (DSCA) to conform with
NYSDEC regulations considering proposed sanitary flows are intended to convey a flow
greater than 2,500 gallons per day.
In accordance with Erie County policy a downstream, dry weather sanitary capacity analysis
is included. The monitoring report is included in the appendices.
Based on the flow depth measurements recorded the following conclusions are reached:
• At no time did the flow depth exceed pipe diameter at any of the downstream
monitoring points during the wet weather events monitored.
• One time during the monitoring period the depth of flow exceeded the diameter of
the pipe.
3.3 DSCA Summary
Erie County provided three (3) nodes, described below:
• Flow Monitoring Period: August 13, 2024, to September 18, 2024
• Dry Week Days Monitored: Aug 13-15, Aug 20-23, Aug 26-30, Sept 2-5, Sept 10-13,
and Sept 16-18.
• Dry Weekend Days Monitored: Aug 24-25, Sept 8, and Sept 14-15.
Nodes (manholes):
• Node 1 MH BAA8A – 48” RCP (Matthews Cemetery NW Corner)
• Node 2 MH BAA9A – 60” RCP (Casimer Street)
• Node 3 MH BAAA8 – 66” RCP (8 Cable Street)
Design Parameters:
Hydraulic Loading rates per NYS Design Standards for Intermediate Wastewater Treatment
Systems, March 5, 2014. Calculations included below:
Apartments – Bedroom Units = 110 gpd/unit
Office Space= 15 gpd / employee
Average Daily Design Flow:
One Bdrm Units:(24 units) x (1 bdrm/unit)x 110gpd/bdrm=2,640 gpd
Two Bdrm Units:(29 units) x (2 bdrm/unit)x110gpd/bdrm=6,380 gpd
Page 75 of 359
Page 76
West Seneca Sewer Report | Page 4
Three Bdrm Units:(22 units) x (3 bdrm/unit)x110gpd/bdrm=7,260 gpd
Office Space: 4 Employees x 15 gpd = 60 gpd
Total = 16,340 gpd
Peak Hourly Flow (Sanitary): 16,340 gpd x Peak Factor
Total Population=[(24x1)+(29x2)+(22x3)]x2 people per bedroom=
=148x2= 296People (assume 2 people per bedroom)+4 office employees=300. P = 0.300 (in
thousands)
Peaking Factor = (18 + √P) / (4+√P) = (18+0.548)/(4+0.548)=4.08
Peak Sanitary Demand =16,340x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Sanitary Demand Calculations:
Node 1 – Average 16,340 gpd (0.016 MGD)
Entire Site:
110-gal/d/unit x 1bdrmx24 units=2,640 gpd
+ 110-gal/d/unit x 2bdrmx29 units=6,380 gpd
+110-gal/d/unitx3bdrmx22 units=7,260 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,340 gpd
Ave. Total = 16,340 gpd (0.016 MGD)
Assume 2 people per bedroom. 2 x 148 bedrooms = 296 people + 4 office employees = 300
people. P = 0.300 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,340 x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Node 2 – Average 16,340 gpd (0.016 MGD)
Entire Site:
110-gal/d/unit x 1bdrmx24 units=2,640 gpd
+ 110-gal/d/unit x 2bdrmx29 units=6,380 gpd
+110-gal/d/unitx3bdrmx22 units=7,260 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,340 gpd
Ave. Total = 16,340 gpd (0.016 MGD)
Assume 2 people per bedroom. 2 x 148 bedrooms = 296 people + 4 office employees = 300
people. P = 0.300 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,340 x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Node 3 – Average 16,340 gpd (0.016 MGD)
Page 76 of 359
Page 77
West Seneca Sewer Report | Page 5
Entire Site:
110-gal/d/unit x 1bdrmx24 units=2,640 gpd
+ 110-gal/d/unit x 2bdrmx29 units=6,380 gpd
+110-gal/d/unitx3bdrmx22 units=7,260 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,340 gpd
Ave. Total = 16,340 gpd (0.017 MGD)
Assume 2 people per bedroom. 2 x 148 bedrooms = 296 people + 4 office employees = 300
people. P = 0.300 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,340 x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Table 2: Dry Weather Peak Weekday
Proposed
Total
Existing Peak Theoretical
Ave. Daily Peak Available Capacity
Node Sewer Peak Flow Sanitary Capacity
Flow (mgd) Flow (Y/N)
(mgd) Flow (mgd)
(mgd)
(mgd)
1-MH 48” RCP @ 0.41%
BAA8A (Matthews
0.016 7.953* 0.067 8.020 59.6 Y
Cemetery NW
Corner)
2-MH 60” RCP @ 0.042%
0.016 11.619** 0.067 11.686 34.6 Y
BAA9A (Casimer Street)
3-MH 66” RCP @ 0.026%
BAAA8 0.016 10.614*** 0.067 10.614 35.1 Y
(8 Cable Street)
Notes:
*Peak Dry Week Day for Nodes 1 on Aug 27,2024
**Peak Dry Week Day for Node 2 on Aug 21,2024
***Peak Dry Week Day for Node 3 on Aug 21,2024
Table 3: Dry Weather Peak Weekend Day
Proposed
Total
Ave. Daily Existing Peak Theoretical
Peak Available Capacity
Node Sewer Flow Peak Flow Sanitary Capacity
Flow (Y/N)
(mgd) (mgd) Flow (mgd)
(mgd)
(mgd)
1-MH 48” RCP @ 0.41%
BAA8A (Matthews
0.016 6.070* 0.067 6.137 59.6 Y
Cemetery NW
Corner)
Page 77 of 359
Page 78
West Seneca Sewer Report | Page 6
2-MH 60” RCP @ 0.042%
BAA9A 0.016 11.972** 0.067 12.039 34.6 Y
(Casimer Street)
3-MH 66” RCP @ 0.026%
BAAA8 0.016 11.615*** 0.067 11.682 35.1 Y
(8 Cable Street)
Notes:
*Peak Dry Weekend Day for Nodes 1 on Aug 25,2024
**Peak Dry Weekend Day for Node 2 on Sept 14,2024
***Peak Dry Weekend Day for Node 3 on Sept 14,2024
3.5 DSCA CONCLUSION
Based on the analysis and flow monitoring results the flow depth peak increases are
described below. The combined sewer has sufficient capacity to handle projected peak
flows.
• Node 1 projected peak 0.067 MGD flow (0.10 CFS) result in approximately a 1.6 inch
water level increase within the 48” RCP sewer.
• Node 2 projected peak 0.067 MGD flow (0.10 CFS) result in approximately 2.6 inch
water level increase within the 60” RCP sewer.
• Node 3 projected peak 0.067 MGD flow (0.10 CFS) result in approximately 2.9 inch
water level increase within the 66” RCP sewer.
Full sewer calculations including – TECsmith Flow Monitoring Data, TECsmith Time Tables,
Eire County Flow Monitoring and Erie County Time Tables are included in the Full Sewer
Report which was previously provided to the town as a part of the Special Use Permit review
process.
Section 4 – Proposed Stormwater Facilities
4.1 Proposed Stormwater Loading
A Stormwater Pollution Prevention Plan (SWPPP) has been developed as part of this project
and is included under a separate cover. The proposed on-site storm system will outlet to
Cayuga Creek. The stormwater design meets the Town of West Seneca Town Code (2025-
09-08) - Chapter 102A Stormwater Management and Erosion and Sediment Control and the
NYSDEC 2024 Stormwater Design Manual Regulations. However, pertinent information
pertaining to existing and proposed stormwater loading has been included for analysis in the
table below.
4.2 Required WQv
Stormwater runoff from impervious surfaces is recognized as a significant contributor of
pollution that can adversely affect the quality of receiving water bodies. Therefore, treatment
of stormwater runoff is important since most runoff related water quality contaminants are
Page 78 of 359
Page 79
West Seneca Sewer Report | Page 7
transported from land, particularly the impervious surfaces, during the initial stages of storm
events.
The Design Manual requires that water quality treatment be provided for the initial flush of
runoff from every storm. The NYSDEC refers to the amount of runoff to be treated as the
“Water Quality Volume” (WQv). Section 4.2 of the Design Manual defines the Water Quality
Volume as follows:
WQv = [(P )(R V )(A )]
12
Where: P = 90% Rainfall Event Number
Rv = 0.05 + 0.009 (I)
I = Impervious Cover (Percent)
A = Contributing Area in Acres
This definition ensures that, all other things being equal, the Water Quality Volume will
increase along with the impervious cover percentage. This redevelopment project is
proposing a combination of WQv treatment by standard practice(s) and alternative practice(s)
as shown in the following tables:
Table 4: Required WQv Summary
P (inches) A (Ac) I (Ac) Rv WQv Required (cf)
1.00 5.68 2.98 0.29 8,672
4.3 RRv Requirements
Land use change and development in the watershed increases the volume of runoff. As such,
reductions in the amount of runoff from new development, accomplished through the
implementation of a stormwater management plan for the site, will play an important role in
the success or failure of the watershed-wide stormwater management plan. Runoff reduction
techniques can be applied to manage, reduce, and treat stormwater, while maintaining and
restoring natural hydrology through infiltration, evapo-transpiration, and the capture and
reuse of stormwater. Volume reduction techniques by themselves typically are not sufficient
to provide adequate attenuation of stormwater runoff, but they can decrease the size of the
peak runoff rate reduction facilities.
Section 9.2.1.B of the 2024 NYSDEC Design Manual indicates, “Although encouraged, meeting
the RRv criteria is not required for the redevelopment activity portion of a project. The need
to provide RRv shall be considered separately for each design point. For design points with a
net increase in impervious area, RRv is required for the increase in impervious area only.”
As such, bioretentions and a water quality unit have been applied to the project to meet the
WQv objective for the redevelopment activity of the project. The increase in impervious cover
will be treated as new development and both the WQv criteria and RRv criteria are met. The
table below indicates the required RRv for the site.
Page 79 of 359
Page 80
West Seneca Sewer Report | Page 8
Table 5: Required RRv
Total Minimum
Soil Soil Soil Soil
Increase in Weighted RRv
Group A Group B Group C Group D Rv
Impervious S Factor Required
(%) (%) (%) (%)
Area (Ac) (cf)
1.92 0 0 0 100 0.95 0.20 1,324
4.4 Provided WQv and RRv
The following table summarizes both the water quality volume and reduced runoff volume
provided by each practice:
Stormwater Practice WQv Treated (cf) RRv Provided (cf)
Bioretention (3 total areas) 3,338 1,337
Water Quality Unit 6,627 0
Total 9,965 1,337
Based on the above table, the WQv and RRv requirements are being met.
4.5 Discharge Rates
A comparison of the pre- and post-development watershed conditions was performed for all
Design Points and storm events evaluated. For all Design Points and design storms, this
comparison demonstrates that the peak rate of runoff will not be increased. Therefore, the
project will not have a significant adverse impact on the adjacent or downstream properties
or receiving water courses.
The results of the computer modeling used to analyze the pre- and post-development
watersheds are presented in the following table below:
Table 6: Summary of Pre-Development and Post-Development Peak Discharge Rates
10-year 24-hour storm event 100-year 24-hour storm event
Analysis Point
(AP)
Pre Post Pre Post
1 16.3 13.9 36.8 31.7
Based on the table above, the proposed stormwater flows have been reduced for all storm
events to below pre-development conditions.
A full stormwater pollution prevention plan per NYS Stormwater Design Manual, NYSDEC
SPDES General Permit for Stormwater Discharge from Construction Activity and NYSDEC
Page 80 of 359
Page 81
West Seneca Sewer Report | Page 9
Standards and Specifications for Erosion and Sediment Control has been prepared for this
project. The SWPPP is included in the Site Plan Application Package.
Section 5 – Proposed Water Facilities
5.1 Proposed Water Connections
The project is proposing a new water connection to the Eire County Water Authority (EWCA)
12” water main on the north side of Clinton Street.
5.2 Existing Flow Test Data
Existing hydrant flow test data was provided for hydrant J11F55 and completed on 7/15/2019.
The existing water line is a 6” cast iron pipe on the south side of Clinton Street. The residual
pressure was 54 psi at 872 gpm.
5.3 Proposed Water Demand
The anticipated average daily water demand from the proposed development was
calculated using Table B-3 of the NYSDEC Design Standards for Intermediate Sized
Wastewater Treatment Systems, dated March 5, 2014. For apartments constructed after
1994, the average daily water demand per bedroom is 110-gallons per day. The proposed
project includes updating all water fixtures to modern energy efficient fixtures. Based on
this, the anticipated average daily water demand for the proposed development is as
follows:
Table 7: Anticipated Water Demand
Average Daily Demand
No. of Bedrooms No. of Units Water Demand Per Unit (GPD)
(GPD)
1 Bedroom 24 110 2,640
2 Bedroom 29 220 6,380
3 Bedroom 22 330 7,260
Total Average Daily Demand 16,340
Maximum Day (2x Average Daily) 32,680
Peak Hourly (4x Average Daily) 35,360
5.4 Proposed Fire Protection and Backflow
The project is proposing one combined service from Clinton Street, which will split into
combined services feeding the existing mansion and new building respectively. New
backflow prevention devices are proposed for each of the buildings, splitting into separate
domestic and fire services after the backflows. The domestic services will be metered within
each building. The private hydrants on site will be fed after the backflow within each building.
Refer to the MEP and FP plans for detailed design.
Page 81 of 359
Page 82
Stormwater Pollution Prevention Plan
Prepared for:
Home Leasing
75 South Clinton Avenue, Suite 700,
Rochester, NY 14604
Submitted by:
LaBella Associates
300 Pearl Street, Suite 130
Buffalo, NY 14202
(716) 551-6281
West Seneca Apartments
Town of West Seneca, Erie County, New York
Date: April 2026
Last revised: April 2026
Project No. 2241067
Page 82 of 359
Page 83
Page 83 of 359
Page 84
PREPARER OF THE SWPPP
“I certify under penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.”
Name and Title1: Kristopher Winkler, PE
Date: Issued: April 2026
1 This is a signature of a New York State licensed Professional Engineer employed by LaBella Associates that is duly
authorized to sign and seal Stormwater Pollution Prevention Plans (SWPPPs), NOIs, and NOTs prepared under their direct
supervision. Refer to Appendix B for the SWPPP Preparer Certification Form, and Appendix I for the LaBella Certifying
Professionals Letter.
Page 84 of 359
Page 85
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY .................................................................................................................... 1
1.1 Project Description ................................................................................................................... 1
1.2 Stormwater Pollution Controls................................................................................................. 2
2.0 SITE CHARACTERISTICS .................................................................................................................. 3
2.1 State Environmental Quality Review ....................................................................................... 3
2.2 Land Use and Topography ....................................................................................................... 3
2.3 Soils and Groundwater............................................................................................................. 3
2.4 Watershed Designation ........................................................................................................... 4
2.5 Receiving Water Bodies ........................................................................................................... 4
2.6 Aquifer Designation .................................................................................................................. 4
2.7 Wetlands ................................................................................................................................... 4
2.8 Flood Plains .............................................................................................................................. 4
2.9 Listed, Endangered, or Threatened Species .......................................................................... 5
2.10 Historic Places ........................................................................................................................ 5
2.11 Rainfall Data........................................................................................................................... 5
2.12 Pre-development Watershed Conditions .............................................................................. 5
2.13 Post-development Watershed Conditions ............................................................................ 6
2.14 Description of Design Points ................................................................................................. 6
3.0 STORMWATER MANAGEMENT PLANNING .................................................................................... 6
3.1 STEP 1 – Site Planning ............................................................................................................ 7
3.2 STEP 2 – Calculate Water Quality Treatment Volume (WQv) ................................................ 7
3.3 STEP 3 – Apply RR Techniques and Standard SMPs with RRv Capacity to Reduce
Total WQv......................................................................................................................................... 8
3.4 STEP 4 – Calculate the Minimum RRv Required.................................................................... 9
3.5 STEP 5 – Apply Standard SMPs to Address Remaining Water Quality Volume .................... 9
3.6 STEP 6 - Apply Volume and Peak Rate Control .................................................................... 11
3.7 Climate Change Consideration .............................................................................................. 13
4.0 CONSTRUCTION SEQUENCE ......................................................................................................... 14
5.0 CONSTRUCTION-PHASE POLLUTION CONTROL ........................................................................... 14
5.1 Temporary Erosion and Sediment Control Measures .......................................................... 15
5.2 Permanent Erosion and Sediment Control Measures ......................................................... 17
5.3 Implementation Schedule for Erosion and Sediment Control Measures ........................... 17
Page 85 of 359
Page 86
5.4 Other Pollutant Controls......................................................................................................... 18
5.5 Construction Housekeeping Practices .................................................................................. 21
6.0 INSPECTIONS, MAINTENANCE, AND REPORTING ....................................................................... 22
6.1 Inspection and Maintenance Requirements ........................................................................ 22
6.2 Reporting Requirements ........................................................................................................ 24
7.0 SWPPP IMPLEMENTATION RESPONSIBILITIES ........................................................................... 26
7.1 Owner’s/Operator's Responsibilities..................................................................................... 26
7.2 Owner’s/Operator’s Engineer’s Responsibilities.................................................................. 29
7.3 Contractor's Responsibilities ................................................................................................. 30
7.4 Qualified Inspector’s/Qualified Professional’s Responsibilities ......................................... 31
7.5 SWPPP Participants ............................................................................................................... 33
LIST OF TABLES
Table 1: USDA Soil Data .............................................................................................................................. 3
Table 2: Project Site HSG Data ................................................................................................................... 3
Table 3: Rainfall Data .................................................................................................................................. 5
Table 4: Required WQv Treatment by Alternative Practice ....................................................................... 8
Table 5: WQv Required Summary ............................................................................................................... 8
Table 6: Summary of Standard SMPs with RRv Capacity being Applied .................................................. 9
Table 7: RRv Summary ................................................................................................................................ 9
Table 8: Summary of WQv Provided ......................................................................................................... 10
Table 9: Summary of Hydrodynamic Unit(s) ............................................................................................. 11
Table 10: Design Events ............................................................................................................................ 13
Table 11: CPv Summary ............................................................................................................................ 13
Table 12: Summary of Pre- and Post-Development Peak Discharge Rates ........................................... 13
Table 13: Implementation Schedule for Erosion and Sediment Control Measures .............................. 18
Table 14: Common Construction Pollutants ............................................................................................ 20
Page 86 of 359
Page 87
APPENDICES
Appendix A: Figures
• A-1: Site Location Map
• A-2: Soils Map
• A-3: Historic Places Screening Map
• A-4: Environmental Resource Map
• A-5: FEMA Firm Map
• A-6: Pre-Development Watershed Delineation Map (Pocket)
• A-7: Post-Development Watershed Delineation Map (Pocket)
Appendix B: Forms
• Notice of Intent (NOI)
• MS4 SWPPP Acceptance Form
• SWPPP Preparer Certification Form
• Owner/Operator Certification Form
• Contractor and Subcontractor Certification Forms
• Notice of Termination (NOT)
Appendix C: Project Evaluation and Design Calculations
Appendix D: Pre-Development Stormwater Modeling
Appendix E: Post-Development Stormwater Modeling
Appendix F: SWPPP Inspection Report (Sample Form)
Appendix G: Post-Construction Inspections and Maintenance
Appendix H: NYSDEC “Deep-Ripping and Decompaction,” April 2008
Appendix I: LaBella Certifying Professionals Letter
Appendix J: NYSDEC SPDES General Permit GP-0-25-001
Page 87 of 359
Page 88
1.0 EXECUTIVE SUMMARY
This Stormwater Pollution Prevention Plan (SWPPP) has been prepared for major activities associated
with construction of a 75-unit affordable housing complex and related site work in the Town of West
Seneca. This SWPPP includes the elements necessary to comply with the national baseline general
permit for construction activities enacted by the U.S. Environmental Protection Agency (EPA) under the
National Pollutant Discharge Elimination System (NPDES) program and all local governing agency
requirements. This SWPPP must be executed, and permit coverage must be obtained prior to the
commencement of construction activity.
This SWPPP has been developed in accordance with the “New York State Department of Environmental
Conservation (NYSDEC) State Pollutant Discharge Elimination System (SPDES) General Permit for
Stormwater Discharges from Construction Activity,” Permit No. GP-0-25-001, effective January 29,
2025 through January 28, 2030. The SWPPP and accompanying plans identify and detail stormwater
management, pollution prevention, and erosion and sediment control measures necessary during and
following completion of construction.
This SWPPP and the accompanying plans entitled “West Seneca Apartments” have been submitted as
a set. These engineering drawings are considered an integral part of this SWPPP. Therefore, this
SWPPP is not considered complete without them. References made herein to “the plans” or to a
specific “sheet” refer to these drawings.
This report considers the impacts associated with the intended development with the purpose of:
1. Maintaining existing drainage patterns as much as possible while continuing the conveyance
of upland watershed runoff;
2. Controlling increases in the rate of stormwater runoff resulting from the proposed development
so as not to adversely alter downstream conditions; and
3. Mitigating potential stormwater quality impacts and preventing soil erosion and sedimentation
resulting from stormwater runoff generated both during and after construction.
The analysis and design completed and documented in this report is intended to be part of the
application made for a multi-family residential redevelopment project with an increase in impervious
area completed on behalf of the Owner/Operator.
1.1 Project Description
Home Leasing is proposing redevelopment project with an increase in impervious area, to include: 75-
unit affordable housing building, associated parking, sidewalks, and landscaping. The total project
area of disturbance proposed is 5.7 acres. The project will disturb one (1) or more acres and as
such, preparation of this SWPPP is required under GP-0-25-001. A Site Location Map has been
provided in Appendix A, as Figure A-1.
This type of project is included in Table 2 of Appendix B of GP-0-25-001; and the project site is not
located in one of the watersheds listed in Appendix C of GP-0-25-001. Therefore, this SWPPP includes
post-construction stormwater management practices, as well as erosion and sediment controls.
project is located within the Town Of West Seneca regulated, traditional land use control Municipal
Separate Stormwater Sewer System (MS4). Therefore, an MS4 SWPPP Acceptance Form is required
to accompany NOIs submitted to the NYSDEC.
Stormwater Pollution Prevention Plan
Page 1
2241067
Page 88 of 359
Page 89
Runoff from the project site will discharge to the Cayuga Creek, which is not included in the list of
Section 303(d) water bodies included in Appendix D of GP-0-25-001.
Project construction activities will consist primarily of site grading, paving, building construction, and
the installation of storm drainage, water supply, sanitary sewer, and public utility infrastructure
necessary to support the proposed redevelopment project with an increase in impervious area.
Construction phase pollutant sources anticipated at the site are disturbed (exposed) soil, vehicle fuels
and lubricants, chemicals associated with building construction, and building materials. Without
adequate control there is the potential for each type of pollutant to be transported by stormwater.
1.2 Stormwater Pollution Controls
The stormwater pollution controls outlined herein have been designed and evaluated in accordance
with the following standards and guidelines:
• New York State Stormwater Management Design Manual, dated July 31, 2024 (Design
Manual).
• New York State Standards and Specifications for Erosion and Sediment Control, dated
November 2016 (SSESC).
• Town of West Seneca Town Code (2025-09-08) - Chapter 102A Stormwater Management and
Erosion and Sediment Control
Stormwater quality will be enhanced through the implementation of temporary and permanent erosion
and sediment control measures, the proposed stormwater management practice(s), and other
construction-phase pollution controls outlined herein.
The proposed stormwater management approach consisting of pipes, open drainage ways, and on-
site stormwater management practices will adequately collect, treat, and convey the stormwater
runoff.
Bioretentions and a water quality unit will be used to manage and treat stormwater runoff generated
by the proposed redevelopment project with an increase in impervious area.
Pre- and post-development surface runoff rates have been evaluated for the 1-, 10-, and 100-year 24-
hour storm events. Comparison of pre- and post-development watershed conditions demonstrates that
the peak rate of runoff from the project site will not be increased.
The pollutant loading analysis indicates stormwater quality will be enhanced through the
implementation of the proposed stormwater management practices outlined herein.
The post-construction stormwater management practice(s) will be privately owned by Home Leasing.
Deed restrictions will be in place, which require operation and maintenance of the practice(s) in
accordance with the operation and maintenance plan.
Stormwater Pollution Prevention Plan
Page 2
2241067
Page 89 of 359
Page 90
2.0 SITE CHARACTERISTICS
2.1 State Environmental Quality Review
The construction activity is subject to State Environmental Quality Review (SEQR). The project is
considered a Unlisted action. As such, SEQR coordination has been completed. Negative Declaration
issued on 1/27/2025, amended on 2/9/2026. A copy of the SEQR documentation, in accordance
with Part I.A.5. of GP-0-25-001, is provided in Appendix A, as Figure A-5 upon receipt.
2.2 Land Use and Topography
The project site is located within the R-50 zoning district. Multiple-family dwellings is a permitted use
subject to a special use permit within this district. Special Use Permit was obtained on 2/9/2026.
The overall site is slightly sloping, with slopes ranging from 1 to 10 percent. Site elevations range from
approximately 580 feet above mean sea level (MSL) to 600 feet MSL. The site generally slopes to the
north and the west towards Cayuga Creek.
2.3 Soils and Groundwater
The US Department of Agriculture (USDA) Web Soil Survey (http://websoilsurvey.nrcs.usda.gov/app/)
was used to obtain surficial soil conditions for the study area, as follows:
Table 1: USDA Soil Data
Depth to Depth to
Hydrologic Erosion
Map Symbol & Description Water Table Bedrock
Soil Group Factor K
(feet) (feet)
Fu - Fluvaquents and Udifluvents, frequently
A/D 0.17 0.50 >6.0
flooded
GaA - Galen very fine sandy loam, 0 to 3
A/D 0.37 1.75 >6.0
percent slopes
GaB - Galen very fine sandy loam, 3 to 8
A/D 0.37 1.75 >6.0
percent slopes
Te – Teel silt loam B/D 0.37 1.75 >6.0
Upon review of the soil data presented in Table 1, the project site does not contain soils with a soil
slope phase of D with a map unit name that inclusive of slopes greater than 25%, and does not contain
soils with a soil slope phase of E or F.
The project site is composed of HSG A soils, HSG B soils, and HSG D soils, as shown in the table below.
For the purposes of this report, HSG X/D soils were modeled as HSG D soils to reflect the undrained
condition.
Table 2: Project Site HSG Data
HSG A HSG B HSG C HSG D
0% 0% 0% 100%
Stormwater Pollution Prevention Plan
Page 3
2241067
Page 90 of 359
Page 91
The Soil Conservation Service defines the hydrologic soil groups as follows:
• Type A Soils: Soils having a high infiltration rate and low runoff potential when thoroughly wet.
These soils consist mainly of deep, well drained to excessively drained sands or gravelly sands.
These soils have a moderate rate of water transmission.
• Type B Soils: Soils having a moderate infiltration rate when thoroughly wet and consisting
mainly of moderately deep to deep, moderately well to well drained soils with moderately fine
to moderately course textures. These soils have a moderate rate of water transmission.
• Type D Soils: Soils having a very low infiltration rate and high runoff potential when thoroughly
wet. These soils consist chiefly of clays that have high shrink-swell potential, soils that have a
permanent high water table, soils that have a clay pan or clay layer at or near the surface, and
soils that are shallow over nearly impervious material. These soils have a very low rate of water
transmission.
The soils map for the study area is presented in Appendix A, as Figure A-2.
2.4 Watershed Designation
The project site is not located in a restricted watershed identified in Appendix C of GP-0-25-001.
2.5 Receiving Water Bodies
The nearest natural classified water course into which runoff from the project site will discharge is
Cayuga Creek. Cayuga Creek is classified by NYSDEC as a Class C water course, and is not included
in the Section 303(d) list of impaired waters found in Appendix D of GP-0-25-001.
2.6 Aquifer Designation
The project site is not located over a US EPA designated Sole Source aquifer; nor is it located over a
Primary or Principal aquifer listed in the NYSDEC Technical and Operational Guidance Series (TOGS)
2.1.3 (1980).
2.7 Wetlands
A search on the NYSDEC Environmental Resource Mapper on April 16, 2026, and a review of GIS
data, determined that there are no known regulated wetlands located on or in the vicinity of the project
site. A wetland delineation is scheduled for Spring 2026 to field verify if there are any wetland on site.
2.8 Flood Plains
According to the National Flood Insurance Program Flood Insurance Rate Map (FIRM), Town of West
Seneca, New York, Community, the project site lies within Flood Zone X, areas determined to be outside
500-year floodplain The FEMA Flood Map has been provided in Appendix A, as Figure A-5.
Stormwater Pollution Prevention Plan
Page 4
2241067
Page 91 of 359
Page 92
2.9 Listed, Endangered, or Threatened Species
A search was performed on the NYSDEC Environmental Resource Mapper on April 16, 2026, and
determined that the project site may contain threatened or endangered species, or critical habitat.
An Environmental Resource Map has been provided in Appendix A, as Figure A-4.
2.10 Historic Places
A search on the New York State Cultural Resource Information System (CRIS) database, performed on
April 16, 2026, revealed the construction activity is located within an archeologically sensitive area A
printout of the historic places screening map is presented in Appendix A, as Figure A-3. As such,
NYSOPRHP coordination has been completed and a Phase 1 Archeological Survey was conducted on
June 22, 2023 by archeologist. A copy of the NYSOPRHP documentation, in accordance with Part I.A.4.
of GP-0-25-001, is provided in Appendix A, as Figure A-3A upon receipt.
2.11 Rainfall Data
Rainfall data utilized in the modeling and analysis was obtained from the Cornell University online
Extreme Precipitation in New York & New England website (http://precip.eas.cornell.edu/). A local IDF
file was imported, and specific mass curves were generated, in HydroCAD to evaluate the pre- and
post-development stormwater runoff characteristics. Rainfall data specific to the portion of Erie
County under consideration, for various 24-hour storm events, is presented in the following Table:
Table 3: Rainfall Data
Storm Event 24-Hour Rainfall
Return Period (inches)
1-year 1.82
10-year 3.14
100-year 5.22
2.12 Pre-development Watershed Conditions
The pre-development project site is covered predominantly by buildings, pavement, grass, and woods.
Analysis of pre-development conditions considered existing drainage patterns, soil types, ground
cover, and topography. The Pre-Development Watershed Delineation Map has been provided in
Appendix A, as Figure A-5.
The results of the computer modeling used to analyze the overall watershed under pre-development
conditions are presented in Appendix D. A summary of the pre-development watershed runoff rates at
each Design Point is presented in Table 10.
Subcatchment one is a 3.38± acre watershed consisting of grass and pavement. Runoff flows south
overland via sheet and shallow concentrated flow toward a swale and catch basin at the southeast
corner of the site. This subcatchment is tributary to Design Point (AP) 1.
Subcatchment two is a 7.74± acre watershed consisting of grass, pavement, and multiple buildings.
Runoff flows west overland via sheet and shallow concentrated flow toward Cayuga Creek west of the
site. This subcatchment is tributary to Design Point (AP) 1.
Stormwater Pollution Prevention Plan
Page 5
2241067
Page 92 of 359
Page 93
2.13 Post-development Watershed Conditions
The post-development project site is covered predominantly by buildings, pavement, sidewalks, grass,
and woods. The analysis of post-development conditions considered existing drainage patterns, soil
types, ground cover to remain, planned site development, site grading, and stormwater management
facilities proposed as part of site improvements. The Post-Development Watershed Delineation Map
has been provided in Appendix A, as Figure A-6.
The results of the computer modeling used to analyze the overall watershed under post-development
conditions are presented in Appendix D. A summary of the post-development watershed runoff rates
at each Design Point is presented in Table 11.
There are numerous locations and methods for providing controls of off-site discharge of stormwater
from the project site. Each has been designed to provide the above quantity controls by attenuating
stormwater runoff and releasing runoff to off-site locations at a rate equal to or less than that which
existed prior to development of the site. Each device is detailed on the accompanying plans. A Post-
Development Watershed Delineation Map, with the tributary areas to each stormwater management
practice proposed, has been provided in Appendix A, as Figure A-6.
2.14 Description of Design Points
The study area consists of the 11.2 acre project site and 5.7 acre area of disturbance. The overall
watershed was broken down into smaller watersheds, or subcatchments, to allow for analysis of runoff
conditions at several locations throughout the study area. Each of these locations was defined as a
Design Point (DP) in order to compare the effects resulting from stormwater management facilities
proposed as part of the project. Descriptions of each of the selected Design Points are provided below.
• Design Point 1: Off-site discharge to Cayuga Creek
3.0 STORMWATER MANAGEMENT PLANNING
Chapter 3 of the Design Manual outlines a six-step planning process for site planning and selection of
stormwater management practices that must be implemented for both new development and
redevelopment projects. This process is intended to develop a design that maintains pre-construction
hydrologic conditions through the application of environmentally sound development principles, as
well as treatment and control of runoff discharges from the site. The following sections outline the
step-by-step process and how it has been applied to this project.
The goals of this Stormwater Management Plan are to analyze the peak rate of runoff under pre- and
post-development conditions, to maintain the pre-development rate of runoff in order to minimize
impacts to adjacent or downstream properties, and to minimize the impact to the quality of runoff
exiting the site.
The Design Manual provides both water quality and water quantity objectives to be met by projects
requiring a “Full SWPPP”. These objectives will be met by applying stormwater control practices to limit
peak runoff rates and improve the quality of runoff leaving the developed site.
Stormwater Pollution Prevention Plan
Page 6
2241067
Page 93 of 359
Page 94
3.1 STEP 1 – Site Planning
During the Site Planning process, the project site is evaluated for implementation of the green
infrastructure planning measures identified in Table 3.1 of the Design Manual, in order to preserve
natural resources and reduce impervious cover. Appendix C provides a description of each green
infrastructure planning measure, along with a project specific evaluation.
3.2 STEP 2 – Calculate Water Quality Treatment Volume (WQv)
Stormwater runoff from impervious surfaces is recognized as a significant contributor of pollution that
can adversely affect the quality of receiving water bodies. Therefore, treatment of stormwater runoff
is important since most runoff related water quality contaminants are transported from land,
particularly the impervious surfaces, during the initial stages of storm events.
3.2.1 NYSDEC Requirements for Water Quality Volume
The Design Manual requires that water quality treatment be provided for the initial flush of runoff from
every storm. The NYSDEC refers to the amount of runoff to be treated as the “Water Quality Volume”
(WQv). Section 4.2 of the Design Manual defines the Water Quality Volume as follows:
WQv = (P)(R V )(A)
12
Where: P = 90% Rainfall Event Number
Rv = 0.05 + 0.009 (I)
I = Impervious Cover (Percent)
A = Contributing Area in Acres
This definition ensures that, all other things being equal, the Water Quality Volume will increase along
with the impervious cover percentage.
3.2.2 Methodology for Redevelopment Projects
Chapter 9 of the Design Manual outlines alternative WQv treatment objectives for redevelopment
projects.
According to Section 9.2.1.B.IV, redevelopment activities can achieve the water quality treatment
objective through a combination of impervious cover reduction, standard SMPs, and alternative SMPs
that provide a weighted average of at least two of the above methods, calculated as shown below. In
this case, 100% of any new increase in impervious area to a given design point must be treated by
approved alternate SMPs, standard SMPs, or RR techniques.
%ALT = [25-(% ICRED+ %SMP+ %RR)] x 3
Where:
%ALT = Percent of redevelopment impervious area treated by alternative SMP(s)
%ICRED = Percent reduction in existing disturbed impervious area
%SMP = Percent of redevelopment impervious area treated by standard SMP(s)
%RR = Percent of redevelopment impervious area treated by runoff reduction techniques(s)
Stormwater Pollution Prevention Plan
Page 7
2241067
Page 94 of 359
Page 95
This redevelopment project is proposing a combination of WQv treatment by standard practice(s) and
alternative practice(s) as shown in the following tables:
Table 4: Required WQv Treatment by Alternative Practice
WQv Treatment by Impervious Cover WQv Treatment by Runoff Reduction
Alternative Practice Reduction (IC) Standard Practice
% Area (ac) % Area (ac) % Area (ac) % Area (ac)
38 2.13 0 0 34 1.96 0 0
Table 5: WQv Required Summary
P (inches) A (ac) I (ac) Rv WQv Required
1.00 5.68 2.98 0.29 8,672 cf 0.20 AF
The Water Quality Volume equation has been applied to the drainage area tributary to each of the
stormwater quality practices proposed for this project. The practices have been sized to accommodate
the Water Quality Volume, as per the performance criteria presented in Chapter 6 and/or Chapter 9 of
the Design Manual. Water quality volume calculations for each of the proposed practices are
presented in Appendix C.
3.3 STEP 3 – Apply RR Techniques and Standard SMPs with RRv Capacity to Reduce Total
WQv
Land use change and development in the watershed increases the volume of runoff. As such,
reductions in the amount of runoff from new development, accomplished through the implementation
of a stormwater management plan for the site, will play an important role in the success or failure of
the watershed-wide stormwater management plan. Runoff reduction techniques can be applied to
manage, reduce, and treat stormwater, while maintaining and restoring natural hydrology through
infiltration, evapo-transpiration, and the capture and reuse of stormwater. Volume reduction
techniques by themselves typically are not sufficient to provide adequate attenuation of stormwater
runoff, but they can decrease the size of the peak runoff rate reduction facilities.
3.3.1 NYSDEC Requirements for Redevelopment
Section 9.2.1.B of the Design Manual indicates, “Although encouraged, meeting the RRv criteria is not
required for the redevelopment activity portion of a project. The need to provide RRv shall be
considered separately for each design point. For design points with a net increase in impervious area,
RRv is required for the increase in impervious area only.”
As such, bioretentions and a water quality unit have been applied to the project to meet the WQv
objective for the redevelopment activity of the project. The increase in impervious cover will be treated
as new development and both the WQv criteria and RRv criteria are met.
3.3.2 Application of Standard Stormwater Management Practices (SMPs) with RRv Capacity
The following Table demonstrates a summary of the standard SMP(s) with RRv capacity that have been
incorporated into the stormwater management plan for this project. The standard SMP(s) with RRv
capacity have been designed in accordance with Chapter 6 of the Design Manual. Refer to the contract
drawings for practice dimensions, material specifications, and installation details. Practice specific
calculations are presented in Appendix C.
Stormwater Pollution Prevention Plan
Page 8
2241067
Page 95 of 359
Page 96
Table 6: Summary of Standard SMPs with RRv Capacity being Applied
WQv
Pretreatment
Standard Pretreatment WQv Reduced WQv Total WQv
Design Volume RRv
SMP with Volume Required /RRv Treated1 Provided2
Variant Required Capacity
RRv Capacity Provided (CF) (CF) Provided (CF) (CF)
(% of WQv)
(CF)
Filtration
F-5 25 835 40% 8,672 1,337 2,001 3,338
Bioretention
Footnotes:
1WQv Treated = WQV Required - RRv Provided
2Total WQv Provided = WQV Treated + RRv Provided
3.3.3 RRv Performance Summary
A summary of the RRv provided is presented in the following table:
Table 7: RRv Summary
RRv Provided % RRv Provided/
WQv Required (CF)
WQv Reduced (CF) WQv Reduced
8,672 1,337 >100%
As indicated in the above table, the RRv provided is greater than the RRv required for the project site.
As such, the RRv criteria has been met and the designer can proceed to Step 6.
3.4 STEP 4 – Calculate the Minimum RRv Required
As indicated above, Section 9.2.1.B of the Design Manual indicates, “Although encouraged, meeting
the RRv criteria is not required for the redevelopment activity portion of a project.”
3.5 STEP 5 – Apply Standard SMPs to Address Remaining Water Quality Volume
If the entire Water Quality Volume is not treated through implementation of RR techniques and
standard SMPs with RRv capacity, then the design must achieve the remaining WQv through the
standard SMPs listed in Table 3.3 of the Design Manual or the Alternative Practices outlined in Section
9.4 of the Design Manual.
Stormwater Pollution Prevention Plan
Page 9
2241067
Page 96 of 359
Page 97
Table 8: Summary of WQv Provided
Step 5
Step 3
Reduced WQv to be
Step 2 WQv Reduction by
Treated by Standard
WQv Required (CF) Standard SMPs w/ RRv
SMPs or Alternative
Capacity (CF)1
Practices (CF)2
8,672 3,338 6,627
Footnotes:
1Step 3: WQv Reduction = RRv Provided + WQv Treated by Standard SMP with RRv Capacity
2Step 5: Reduced WQv to be Treated = WQv Required – WQv Reduced
Based upon the results listed in the above Table, the entire WQv has not been treated by application
of RR techniques and standard SMPs with RRv capacity. As such, the standard SMPs or the Alternative
Practices (without RRv capacity) described in the following sections, have been incorporated into the
stormwater management plan for this project, to meet the WQv objective. Practice-specific calculations
are presented in Appendix C.
3.5.1 Underground Stormwater Detention System
Underground stormwater detention systems store and detain stormwater runoff in order to meet water
quantity control requirements. Stormwater is stored in subsurface vaults and/or a system of large
diameter interconnected storage pipes. Stored water is then released at rates designed to reduce
peak run-off flows during post-development storms. Underground stormwater storage provides
minimal stormwater quality benefits, but can be an effective component of a development’s overall
stormwater management plan.
3.5.2 Hydrodynamic Separators
Hydrodynamic separators accelerate the separation of floating and settling pollutants from stormwater
through the use of a vortex. These pre-fabricated devices come in the form of an underground manhole
or vault. The devices have no moving parts and are typically fabricated from concrete and marine grade
aluminum.
During operation, stormwater runoff enters the unit tangentially to promote a gentle swirling motion in
a treatment chamber. As stormwater circles within the chamber, settable solids fall into a sump and
are retained. Buoyant debris, oil, and grease rise to the surface and are separated from the water as
it flows under a baffle wall. Finally, treated water exits the treatment chamber through a flow control
orifice located behind the baffle wall.
During low-flow conditions all runoff is diverted into the treatment chamber by a flow partition. At higher
flow rates, a portion of the runoff spills over the flow partition and is diverted around the treatment
chamber to prevent re-suspension and washout of previously trapped pollutants. Water that spills over
the partition flows into a head equalization chamber above the treatment chamber outlet. As the head
equalization chamber fills, the head differential driving flow through the treatment chamber collapses.
The result is that flow rates in the treatment chamber remain relatively constant even as total flow
rates increase substantially. This configuration further reduces the potential for re-suspension or
washout.
Stormwater Pollution Prevention Plan
Page 10
2241067
Page 97 of 359
Page 98
According to Chapter 9 of the Design Manual, hydrodynamic separators of the type proposed for this
project have been approved for use as a pretreatment system in new and redevelopment projects or
as a primary treatment system on redevelopment projects.
According to Chapter 9 of the Design Manual, membrane filtration, of the type proposed for this project,
has been approved for use as a primary treatment system on redevelopment projects.
The following Table summarizes both the Water Quality Volume requirements and the treatment
volumes provided.
Table 9: Summary of Hydrodynamic Unit(s)
SWM NYSDEC Required WQv Approved Manufactured Product Name
Required
Practice Design Flow Rate Treatment Flow Rate and
WQv (CF)
ID Variant (CFS) (MTFR) (CFS) Manufacturer
Contech
HYD-1 ALT 6,627 1.88 2.00
Cascade CS4
3.6 STEP 6 - Apply Volume and Peak Rate Control
This report presents the pre-development and post-development features and conditions associated
with the rate of surface water runoff within the study area. For both cases, the drainage patterns,
drainage structures, soil types, and ground cover types are considered in this study.
3.6.1 NYSDEC Requirements for New Development
Chapter 4 of the Design Manual requires that projects meet three separate stormwater quantity
criteria:
1. The Channel Protection (CPv) requirement is designed to protect stream channels from
erosion. This is accomplished by providing 24 hours of extended detention for the 1-year, 24-
hour storm event. The Manual defines the CPv detention time as the center of mass detention
time through each stormwater management practice.
2. The Overbank Flood Control (Qp) requirement is designed to prevent an increase in the
frequency and magnitude of flow events that exceed the bank-full capacity of a channel, and
therefore must spill over into the floodplain. This is accomplished by providing detention
storage to ensure that, at each Design Point, the post-development 10-year 24-hour peak
discharge rate does not exceed the corresponding pre-development rate.
3. The Extreme Flood Control (Qf) requirement is designed to prevent the increased risk of flood
damage from large storm events, to maintain the boundaries of the pre-development 100-year
floodplain, and to protect the physical integrity of stormwater management practices. This is
accomplished by providing detention storage to ensure that, at each Design Point, the post-
development 100-year 24-hour peak discharge rate does not exceed the corresponding pre-
development rate.
Stormwater Pollution Prevention Plan
Page 11
2241067
Page 98 of 359
Page 99
3.6.2 Methodology
In order to demonstrate that the NYSDEC detention requirements are being met, the Design Manual
requires that a hydrologic and hydraulic analysis of the pre- and post-development conditions be
performed using the Natural Resources Conservation Service Technical Release 20 (TR-20) and
Technical Release 55 (TR-55) methodologies. HydroCAD, developed by HydroCAD Software Solutions
LLC of Tamworth, New Hampshire, is a Computer-Aided-Design (CAD) program for analyzing the
hydrologic and hydraulic characteristics of a given watershed and associated stormwater management
facilities. HydroCAD uses the TR-20 algorithms and TR-55 methods to create and route runoff
hydrographs.
HydroCAD has the capability of computing hydrographs (which represent discharge rates characteristic
of specified watershed conditions, precipitation, and geologic factors) combining hydrographs and
routing flows though pipes, streams and ponds. HydroCAD can also calculate the center of mass
detention time for various hydraulic features. Documentation for HydroCAD can be found on their
website: http://www.hydrocad.net/.
For this analysis, the watershed and drainage system was broken down into a network consisting of
three types of components as described below:
1. Subcatchment: A relatively homogeneous area of land, which produces a volume and rate of
runoff unique to that area.
2. Reach: Uniform streams, channels, or pipes that convey stormwater from one point to another.
3. Pond: Natural or man-made impoundment, which temporarily stores stormwater runoff and
empties in a manner determined by its geometry and the hydraulic structure located at its
outlets.
Subcatchments, reaches, and ponds are represented by hexagons, squares, and triangles,
respectively, on the watershed routing diagrams provided with the computations included in Appendix
D and Appendix E.
The analysis of hydrologic and hydraulic conditions and proposed stormwater management facilities,
servicing the study area, was performed by dividing the tributary watershed into relatively
homogeneous subcatchments. The separation of the watershed into subcatchments was dictated by
watershed conditions, methods of collection, conveyance, and points of discharge. Watershed
characteristics for each subcatchment were then assessed from United States Geological Service
(USGS) 7.5-minute topographic maps, aerial photographs, a topographical survey, soil surveys, site
investigations, and land use maps.
Proposed stormwater management practices were designed and evaluated in accordance with the
Design Manual and local regulatory requirements. A local IDF file was imported, and specific mass
curves were generated, in HydroCAD to evaluate the pre- and post-development stormwater runoff
characteristics for various 24-hour storm events identified in the following Table.
Stormwater Pollution Prevention Plan
Page 12
2241067
Page 99 of 359
Page 100
Table 10: Design Events
Facility 24-hour Storm Event
Storm Sewer 10-year
1-year
Stormwater Management Practice(s) 10-year
100-year
Flood Conditions 100-year
3.6.3 Performance Summary
A comparison of the total required and provided CPv for the 1-year 24-hour storm event is shown in
the following table:
Table 11: CPv Summary
Design Point Required CPv Provided CPv
(DP) (af) (af)
1 0.20 0.36
A comparison of the pre- and post-development watershed conditions was performed for all Design
Points and storm events evaluated herein. For all Design Points and design storms, this comparison
demonstrates that the peak rate of runoff will not be increased. Therefore, the project will not have a
significant adverse impact on the adjacent or downstream properties or receiving water courses.
The results of the computer modeling used to analyze the pre- and post-development watersheds are
presented in Appendix D and Appendix E, respectively. The following Table summarizes the results of
this analysis.
Table 12: Summary of Pre- and Post-Development Peak Discharge Rates
Pre- vs. Post-Development Discharge Rate (cfs)
Design Point 10-year 24-hour storm event 100-year 24-hour storm event
(DP) Pre Post Pre Post
1 16.3 13.9 36.8 31.7
3.7 Climate Change Consideration
This report presents the consideration for future physical risks due to climate change, in accordance
with Part III.A.2 of the permit. Overall site planning, control measures and practices, conveyance
systems and detention systems were evaluated against the seven (7) physical risks identified by
NYSDEC due to climate change pursuant to the Community Risk and Resiliency Act (CRRA), 6 NYCRR
490, and associated guidance. Appendix C provides a description of each consideration, specific to
the project.
Stormwater Pollution Prevention Plan
Page 13
2241067
Page 100 of 359
Page 101
4.0 CONSTRUCTION SEQUENCE
This project has not received written approval from the Town of West Seneca allowing the disturbance
of more than five acres of land at any one time. Therefore, if the Contractor’s construction sequence
requires the disturbance of more than five acres at any one time, written approval must be obtained
from written approval from the Town of West Seneca prior to disturbing more than five acres at once.
The “Erosion and Sediment Control Plan” and the “Erosion and Sediment Control Plan Prior to
Construction” in the accompanying drawings and waiver request identifies the major construction
activities that are the subject of this SWPPP. The order (or sequence) in which the major activities are
expected to begin is presented on the accompanying drawings, though each activity will not necessarily
be completed before the next begins. In addition, these activities could occur in a different order if
necessary to maintain adequate erosion and sediment control. If this is the case, the contractor shall
notify the Owner’s/Operator’s Engineer overseeing the implementation of the SWPPP.
The Contractor will be responsible for implementing the erosion and sediment control measures
identified on the plans. The Contractor may designate these tasks to certain subcontractors as they
see fit, but the ultimate responsibility for implementing these controls and ensuring their proper
function remains with the Contractor.
In accordance with Part III.B.c.iv. a phasing plan for the project and sequencing plans for all phases
have been provided. The plans address clearing and grubbing, excavation and grading, utility and
infrastructure installation, final stabilization, and any other construction activity at the site that will
result in soil disturbance. Refer to the plans for further information on the project phasing and
sequencing.
5.0 CONSTRUCTION-PHASE POLLUTION CONTROL
The SWPPP and accompanying plans identify the temporary and permanent erosion and sediment
control measures that have been incorporated into the design of this project. These measures will be
implemented during construction, to minimize soil erosion and control sediment transport off-site, and
after construction, to control the quality and quantity of stormwater runoff from the developed site.
Erosion control measures, designed to minimize soil loss, and sediment control measures, intended
to retain eroded soil and prevent it from reaching water bodies or adjoining properties, have been
developed in accordance with the following documents:
• NYSDEC SPDES General Permit for Stormwater Discharges From Construction Activity, Permit
No. GP-0-25-001 (effective January 29, 2025 through January 28, 2030)
• New York State Standards and Specifications for Erosion and Sediment Control, NYSDEC
(November 2016)
The SWPPP and accompanying plans outline the construction scheduling for implementing the erosion
and sediment control measures. These documents include limitations on the duration of soil exposure,
criteria and specifications for placement and installation of the erosion and sediment control
measures, a maintenance schedule, and specifications for the implementation of erosion and
sediment control practices and procedures.
Temporary and permanent erosion and sediment control measures that shall be applied during
construction generally include:
Stormwater Pollution Prevention Plan
Page 14
2241067
Page 101 of 359
Page 102
1. Minimizing soil erosion and sedimentation by stabilization of disturbed areas and by removing
sediment from construction site discharges.
2. Preservation of existing vegetation to the greatest extent practical. Following the completion
of construction activities in any portion of the site, permanent vegetation shall be established
on all exposed soils.
3. Site preparation activities to minimize the area and duration of soil disruption.
4. Establishment of permanent traffic corridors to ensure that “routes of convenience” are
avoided.
5.1 Temporary Erosion and Sediment Control Measures
The temporary erosion and sediment control measures described in the following sections are
included as part of the construction documents.
5.1.1 Stabilized Construction Access
Prior to construction, stabilized construction access(es) will be installed, per accompanying plans, to
reduce the tracking of sediment onto public roadways.
Construction traffic must enter and exit the site at the stabilized construction access(es). The intent is
to trap dust and mud that would otherwise be carried off-site by construction traffic.
The access(es) shall be maintained in a condition, which will control tracking of sediment onto public
rights-of-way or streets. When necessary, additional aggregate will be placed atop the filter fabric to
assure the minimum thickness is maintained. All sediment and/or soil spilled, dropped, or washed
onto public rights-of-way must be removed immediately. Periodic inspection and needed maintenance
shall be provided after each substantial rainfall event.
5.1.2 Dust Control
Water trucks shall be used as needed during construction to reduce dust generated on-site. Dust
control must be provided by the Contractor(s) to a degree that is acceptable to the Owner, and in
compliance with the applicable local and state dust control requirements.
5.1.3 Temporary Soil Stockpile
Materials, such as topsoil, will be temporarily stockpiled (if necessary) on the site during the
construction process. Stockpiles shall be located in an area away from storm drainage, water bodies
and/or courses, and will be properly protected from erosion by a surrounding silt fence barrier.
5.1.4 Silt Fencing
Prior to the initiation of and during construction activities, a geotextile filter fabric (or silt fence) will be
established downgradient of all disturbed areas. These barriers may extend into non-impact areas to
provide adequate protection of adjacent lands.
Clearing and grubbing will be performed only as necessary for the installation of the sediment control
barrier. To facilitate effectiveness of the silt fencing, daily inspections and inspections immediately
after significant storm events will be performed by the Contractor(s). Maintenance of the fence will be
performed as needed.
Stormwater Pollution Prevention Plan
Page 15
2241067
Page 102 of 359
Page 103
5.1.5 Temporary Seeding
For areas undergoing clearing, grading, and disturbance as part of construction activities, where work
has temporarily ceased, temporary soil stabilization measures must be initiated by the end of the next
business day and completed within fourteen (14) days from the date the soil disturbance activity has
temporarily ceased.
5.1.6 Manufactured Insert Inlet Protection
Install insert inlet protection beneath the grate of all catch basins, to prevent sediment from entering
the catch basins and storm sewer system. Remove sediment accumulation and repair or replace insert
as necessary to ensure proper function.
5.1.7 Filter Fabric Drop Inlet Protection
Install filter fabric or silt fence with wooden stakes at the perimeter of existing or proposed catch basins
located in lawn areas, to prevent sediment from entering the catch basins and storm sewer system.
Remove sediment accumulation and repair or replace fabric as necessary to ensure proper function.
5.1.8 Erosion Control Blanket
Erosion control blankets shall be installed in accordance with manufacturer’s requirements on all
slopes exceeding 3:1. Erosion control blankets provide temporary erosion protection, rapid vegetative
establishment, and long-term erosion resistance to shear stresses generated by high runoff flow
velocities associated with steep slopes.
5.1.9 Stone Check Dams
Stone check dams will be installed within drainage ditches to reduce the velocity of stormwater runoff,
promote settling of sediment, and reduce sediment transport off-site.
Sediment accumulated behind the stone check dam will be removed as needed to maintain flow
through the stone check dam and prevent large flows from carrying sediment over or around the dam.
Stones shall be replaced as needed to maintain the design cross section of the structures.
5.1.10 Temporary Sediment Trap
Temporary sediment traps shall be constructed to intercept sediment-laden runoff, reduce the amount
of sediment leaving the disturbed areas, and protect drainage ways, properties, and rights-of-way.
Accumulated sediment shall be removed from the trap when it reaches no greater than 50 percent of
the design capacity. Sediment shall not be placed downstream from the embankment, adjacent to a
stream, or floodplain.
Temporary sediment traps depicted on the accompanying plans have been designed to provide 3,600
CF of storage per acre of tributary watershed.
5.1.11 Temporary Diversion Swales
Temporary diversion swales shall be used to divert off-site runoff around the construction site and
divert runoff from stabilized areas around disturbed areas.
5.1.12 Dewatering Operations
Dewatering will be used to intercept sediment-laden stormwater or pumped groundwater and allow it
to settle out of the pumped discharge prior to being discharged from the site. Water from dewatering
Stormwater Pollution Prevention Plan
Page 16
2241067
Page 103 of 359
Page 104
operations shall be treated to eliminate the discharge of sediment and other pollutants. Water
resulting from dewatering operations shall be directed to temporary sediment traps or dewatering
devices. Temporary sediment traps and dewatering bags will be provided, installed, and maintained
at downgradient locations to control sediment deposits to downstream surfaces.
5.1.13 Fiber Roll
Prior to the initiation of and during construction activities, fiber rolls (12” minimum diameter) will be
established downgradient of all disturbed areas to reduce sheet flow on slopes. These rolls may extend
into non-impact areas to provide adequate protection of adjacent lands. Spacing will conform to
NYSDEC specification for straw bale dike.
Clearing and grubbing will be performed only as necessary for the installation of the fiber rolls. To
facilitate effectiveness, daily inspections and inspections immediately after significant storm events
will be performed by the Contractor(s) and maintenance will be performed as needed.
5.2 Permanent Erosion and Sediment Control Measures
The permanent erosion and sediment control measures described in the following sections are
included as part of the construction documents.
5.2.1 Establishment of Permanent Vegetation
Disturbed areas that will be vegetated must be seeded in accordance with the contract documents.
The type of seed, mulch, and maintenance measures as described in the contract documents shall
also be followed.
Permanent soil stabilization measures must be initiated by the end of the next business day and
completed within fourteen (14) days from the date the soil disturbance activity has permanently
ceased.
Final site stabilization is achieved when all soil-disturbing activities at the site have been completed
and a uniform, perennial vegetative cover with a density of 80 percent has been established or
equivalent stabilization measures (such as the use of mulches or geotextiles) have been employed on
all unpaved areas and areas not covered by permanent structures.
5.2.2 Rock Outlet Protection
Rock outlet protection shall be installed at the locations as indicated and detailed on the
accompanying plans. The installation of rock outlet protection will reduce the velocity and energy of
water, such that the flow will not erode downstream surfaces.
5.3 Implementation Schedule for Erosion and Sediment Control Measures
Proper implementation of the outlined erosion and sediment control measures is critical to minimizing
soil erosion and controlling off-site sediment transport during construction, as well as controlling the
quality and quantity of stormwater runoff from the developed site after construction. The following
table outlines the implementation schedule for initial placement of these measures, and the duration
for which they should remain in place.
Stormwater Pollution Prevention Plan
Page 17
2241067
Page 104 of 359
Page 105
Table 13: Implementation Schedule for Erosion and Sediment Control Measures
Erosion and Sediment
Initial Placement Duration to Remain In-Place
Control Measure
Stabilized Construction Access Upon mobilizing to site Until construction is complete
Dust Control As needed As needed
Upon delivery of materials to the
Until materials have been placed
Temporary Soil Stockpile site or excavation of on-site
or removed from the site
materials for reuse
Prior to upgradient soil Until upgradient area has achieved
Silt Fencing
disturbance permanent stabilization
Apply to any disturbed soil that will
Apply additional seed as needed
Temporary Seeding remain exposed for more than 14
for temporary stabilization
days
Existing structures: prior to
Manufactured Insert Inlet upgradient soil disturbance Until upgradient area has achieved
Protection New structures: upon installation permanent stabilization
of structure/grate
Upon completion of slope grading Prior to final grading, or kept in
Erosion Control Blanket
operations place permanently
Existing swales: upon completion
of swale reshaping
Stone Check Dams Permanent
New swales: upon completion of
swale excavation
As needed during grading Until final grading of tributary area
Temporary Sediment Trap
operations is complete
Until permanent drainage methods
As needed to divert flow around are established (i.e. closed storm
Temporary Diversion Swales
work area sewer, open conveyance swales,
etc.)
Until excavation/backfilling is
Dewatering Operations As needed during excavation
complete
Prior to upgradient soil Until upgradient area has achieved
Fiber Roll
disturbance permanent stabilization
Permanent, apply additional seed
Establishment of Permanent As soon as possible after
as needed to achieve 80%
Vegetation completion of final grading
minimum uniform coverage
During installation of tributary
Rock Outlet Protection Permanent
culverts/pipes
5.4 Other Pollutant Controls
Part I.C.1 of GP-0-25-001 prohibits discharges from construction material wastewater, pollutants
used in vehicle and equipment operation and maintenance, vehicle and equipment washing and
toxic or hazardous substances.
Stormwater Pollution Prevention Plan
Page 18
2241067
Page 105 of 359
Page 106
The following table identifies materials and/or chemicals commonly used and/or stored on
construction sites and should be addressed in the site-specific spill prevention and response plan:
Stormwater Pollution Prevention Plan
Page 19
2241067
Page 106 of 359
Page 107
Table 14: Common Construction Pollutants
Material/Chemical Physical Description Stormwater Pollutants Location*
Pesticides Various colored to Chlorinated Herbicides used for
(insecticides, colorless liquid, hydrocarbons, noxious weed control
fungicides, powder, pellets, or organophosphates,
herbicides, grains carbamates, arsenic
rodenticides)
Fertilizer Liquid or solid grains Nitrogen, phosphorous Newly seeded areas
Cleaning solvents Colorless, blue, or Perchloroethylene, No equipment cleaning
yellow-green liquid methylene chloride, allowed in project limits
trichloroethylene,
petroleum distillates
Asphalt Black solid Oil, petroleum distillates Streets and roofing
Concrete White solid/grey liquid Limestone, sand, pH, Curb and gutter, building
chromium construction
Curing compounds Creamy white liquid Naphtha Curb and gutter
Hydraulic oil/fluids Brown oily petroleum Mineral oil Leaks or broken hoses
hydrocarbon from equipment
Gasoline Colorless, pale brown Benzene, ethyl benzene, Secondary containment /
or pink petroleum toluene, xylene, MTBE staging area
hydrocarbon
Diesel Fuel Clear, blue-green to Petroleum distillate, oil & Secondary containment /
yellow liquid grease, naphthalene, staging area
xylenes
Kerosene Pale yellow liquid Coal oil, petroleum Secondary containment /
petroleum distillates staging area
hydrocarbon
Antifreeze/coolant Clear green/yellow Ethylene glycol, propylene Leaks or broken hoses
liquid glycol, heavy metals from equipment
(copper, lead, zinc)
Sanitary toilets Various colored liquid Bacteria, parasites, and Staging area
viruses
Construction
materials
Granular fill Various colored solids Sediment Stockpile / fill areas
Subbase course Gray/brown solid Sediment, dust Stockpile
Topsoil Brown solid Sediment Stockpile
Mulch Various colored solid Sediment, debris Staging area
Seed Brown/yellow solid Nutrients, debris Staging area
HDPE Storm Pipe Black solid Staging area
SDR-35, SDR-21 Various colored solid Staging area
PVC Pipe
Metals Frames and Gray solid Staging area
Grates
Joint Sealant Light gray viscous Polyurethane Staging area
solid
*(Area where material/chemical is used on-site)
Stormwater Pollution Prevention Plan
Page 20
2241067
Page 107 of 359
Page 108
5.5 Construction Housekeeping Practices
During the construction phase, the Contractor(s) will implement the following measures:
5.5.1 Sediment Sweeping/Vacuuming
Any sediment that is tracked by construction vehicles or erosion onto adjacent public or private
impervious surfaces must be swept or vacuumed, utilizing self-propelled and/or walk-behind
equipment, and removed on a daily basis. Kick brooms and sweeper attachments are not an
acceptable means of sweeping. Sweeping or vacuuming should not take place while tracked sediment
is wet. If tracked sediment is compacted, the sediment must be scraped loose prior to sweeping or
vacuuming.
5.5.2 Material Stockpiles
Material resulting from clearing and grubbing operations that will be stockpiled on-site, must be
adequately protected with downgradient erosion and sediment controls.
5.5.3 Equipment Cleaning and Maintenance
The Contractor(s) will designate areas for equipment cleaning, maintenance, and repair. The
Contractor(s) and subcontractor(s) will utilize those areas. The areas will be protected by a temporary
perimeter berm.
5.5.4 Detergents
The use of detergents for large-scale washing is prohibited (i.e., vehicles, buildings, pavement
surfaces, etc.)
5.5.5 Spill Prevention and Response
A Spill Prevention and Response Plan shall be developed, for the pollutants identified in Section 5.3,
for the site by the Contractor(s) that addresses the following:
1. Reducing chance of spills
2. Stopping the source of spills
3. Containing and cleaning up spills
4. Disposing of materials contaminated by spills
5. Training personnel responsible for spill prevention/response
6. Material handling procedures
7. Material storage requirements
The plan shall detail the steps required in the event of an accidental spill and shall identify contact
names and phone numbers of people and agencies that must be notified.
The plan shall include Safety Data Sheets (SDS) for all materials to be stored on-site. All workers on-
site will be required to be trained on safe handling and spill prevention procedures for all materials
used during construction. Regular tailgate safety meetings shall be held and all workers that are
expected on the site during the week shall be required to attend.
5.5.6 Concrete Washout Areas
A temporary concrete washout area shall be provided for every project where concrete will be poured
or otherwise formed on-site and shall consist of an excavated or above-ground lined construction pit
Stormwater Pollution Prevention Plan
Page 21
2241067
Page 108 of 359
Page 109
where concrete trucks or equipment can be washed out after their loads have been discharged. Waste
generated from concrete wash water that shall not be allowed to flow into drainage ways, inlets,
receiving waters, highway right-of-way, or any location other than the designated concrete washout
area(s). Proper signage shall be placed adjacent to the facility to designate the “Concrete Washout
Area”. Locate the facility a minimum of 100-feet from drainage swales, storm drain inlets, wetlands,
streams, and other surface waters. Prevent surface water from entering the washout area.
The hardened residue from the concrete wash areas will be disposed of in the same manner as other
non-hazardous construction waste materials. Maintenance of the washout area shall include removal
of hardened material when 75% of the storage capacity is filled, and a minimum freeboard of 12
inches shall be maintained. The Contractor will be responsible for seeing that these procedures are
followed. The project may require the use of multiple concrete washout areas based on the frequency
of concrete pours.
5.5.7 Material Storage
Construction materials shall be stored in a dedicated staging area. The staging area shall be located
in an area that prevents negative impacts of construction materials on stormwater quality.
Chemicals, paints, solvents, fertilizers, and other toxic material must be stored in waterproof
containers. Except during application, the contents must be kept in trucks or within storage facilities.
Runoff containing such material must be collected, removed from the site, treated, and disposed of at
an approved solid waste or chemical disposal facility.
6.0 INSPECTIONS, MAINTENANCE, AND REPORTING
6.1 Inspection and Maintenance Requirements
6.1.1 Pre-Construction Inspection and Certification
Prior to the commencement of construction, the Qualified Inspector/Qualified Professional shall
conduct an assessment of the site and certify that the appropriate erosion and sediment control
measures have been adequately installed and implemented. The Contractor shall contact the Qualified
Inspector/Qualified Professional once the erosion and sediment control measures have been
installed.
6.1.2 Construction Phase Inspections and Maintenance
A Qualified Inspector/Qualified Professional, as defined in Appendix A of the General Permit GP-0-25-
001, shall conduct regular site inspections between the time this SWPPP is implemented and final site
stabilization. Site inspections shall occur at an interval of at least once every seven (7) calendar days.
The purpose of site inspections is to assess performance of pollutant controls. Based on these
inspections, the Qualified Inspector/Qualified Professional will decide whether it is necessary to modify
this SWPPP, add or relocate sediment barriers, or whatever else may be needed in order to prevent
pollutants from leaving the site via stormwater runoff. The general contractor has the duty to cause
pollutant control measures to be repaired, modified, maintained, supplemented, or whatever else is
necessary in order to achieve effective pollutant control.
Examples of particular items to evaluate during site inspections are listed below. This list is not
intended to be comprehensive. During each inspection the inspector must evaluate overall pollutant
Stormwater Pollution Prevention Plan
Page 22
2241067
Page 109 of 359
Page 110
control system performance as well as particular details of individual system components. Additional
factors should be considered as appropriate to the circumstances.
1. Locations where vehicles enter and exit the site must be inspected for evidence of off-site
sediment tracking. A stabilized construction access will be constructed where vehicles enter
and exit. This access will be maintained or supplemented as necessary to prevent sediment
from leaving the site on vehicles.
2. Sediment barriers must be inspected and, if necessary, they must be enlarged or cleaned in
order to provide additional capacity. All material from behind sediment barriers will be
stockpiled on the up slope side. Additional sediment barriers must be constructed as needed.
3. Inspections will evaluate disturbed areas and areas used for storing materials that are exposed
to rainfall for evidence of, or the potential for, pollutants entering the drainage system. If
necessary, the materials must be covered or original covers must be repaired or
supplemented. Also, protective berms must be constructed, if needed, in order to contain
runoff from material storage areas.
4. Grassed areas will be inspected to confirm that a healthy stand of grass is maintained. The
site has achieved final stabilization once all areas are covered with building foundation or
pavement, or have a stand of grass with at least 80 percent density. The density of 80 percent
or greater must be maintained to be considered as stabilized. Areas must be watered,
fertilized, and reseeded as needed to achieve this goal.
5. All discharge points must be inspected to determine whether erosion control measures are
effective in preventing significant impacts to receiving waters.
The inspection reports must be completed entirely and additional remarks should be included if
needed to fully describe a situation. An important aspect of the inspection report is the description of
additional measures that need to be taken to enhance plan effectiveness. The inspection report must
identify whether the site was in compliance with the SWPPP at the time of inspection and specifically
identify all incidents of non-compliance.
Within one (1) business day of the completion of an inspection, the Qualified Inspector/Qualified
Professional shall notify the Owner/Operator and appropriate contractor or subcontractor of any
corrective actions that need to be taken. For corrective actions not requiring engineering design, the
contractor must begin implementing corrective actions within one business day and complete the
corrective actions within five business days. For corrective actions requiring engineering design, the
engineering design process must begin within five business days and the contractor must complete
the corrective action in a reasonable time frame but no later than 60 calendar days.
In addition to the inspections performed by the Qualified Inspector/Qualified Professional, the
Contractor shall perform routine inspections that include a visual check of all erosion and sediment
control measures. All inspections and maintenance shall be performed in accordance with the
inspection and maintenance schedule provided on the accompanying plans. Sediment removed from
erosion and sediment control measures will be exported from the site, stockpiled for later use, or used
immediately for general non-structural fill.
It is the responsibility of the general contractor to assure the adequacy of site pollutant discharge
controls. Actual physical site conditions or contractor practices could make it necessary to install more
structural controls than are shown on the accompanying plans. (For example, localized concentrations
of runoff could make it necessary to install additional sediment barriers, sediment traps, etc.)
Assessing the need for additional controls and implementing them or adjusting existing controls will
be a continuing aspect of this SWPPP until the site achieves final stabilization.
Stormwater Pollution Prevention Plan
Page 23
2241067
Page 110 of 359
Page 111
6.1.3 Temporary Suspension of Construction Activities
For construction sites where soil disturbance activities have been temporarily suspended (e.g. Winter
shutdown) and temporary stabilization measures have been applied to all disturbed areas, the
frequency of Qualified Inspector/Qualified Professional inspections can be reduced to once every 30
calendar days. Prior to reducing the frequency of inspections, the Owner/Operator shall notify the
NYSDEC Region 9 stormwater contact person and the Town of West Seneca in writing.
6.1.4 Partial Project Completion
For construction sites where soil disturbance activities have been shut down with partial project
completion, all areas disturbed as of the project shutdown date have achieved final stabilization, and
all post-construction stormwater management practices required for the completed portion of the
project have been constructed in conformance with the SWPPP and are operational, the inspections
by the Qualified Inspector/Qualified Professional can stop. Prior to the shutdown, the Owner/Operator
shall notify the NYSDEC Region 9 stormwater contact person and the Town of West Seneca in writing.
If soil disturbance activities have not resumed within two years from the date of shutdown, a Notice of
Termination (NOT) shall be properly completed and submitted to the NYSDEC.
6.1.5 Post-Construction Inspections and Maintenance
Inspections and maintenance of final stabilization measures and post-construction stormwater
management practices shall be performed in accordance with Appendix G, once all disturbed areas
are stabilized and all stormwater management systems are in place and operable.
6.2 Reporting Requirements
6.2.1 Inspection Reports
Pursuant to Part IV.C of GP-0-25-001, inspection reports shall be prepared for the duration of
construction, as outlined herein, and shall be signed by the Qualified Inspector or Qualified
Professional. A sample inspection form is provided in Appendix F.
At a minimum, each inspection report shall record the following information:
1. Permit identification number; and
2. Date and time of inspection; and
3. Name and title of person(s) performing inspection; and
4. A description of the weather and soil conditions (e.g. dry, wet, saturated) at the time of the
inspection, including the temperature at the time of the inspection; and
5. A description of the condition of the runoff at all points of discharge from the construction site.
This must include identification of any discharges of sediment from the construction site.
Include discharges from conveyance systems (i.e. pipes, culverts, ditches, etc.) and overland
flow; and
6. A description of the condition of all surface waters of the State located within, or immediately
adjacent to, the property boundaries of the construction site which receive runoff from
disturbed areas. This must include identification of any discharges of sediment to the surface
waters of the State; and
Stormwater Pollution Prevention Plan
Page 24
2241067
Page 111 of 359
Page 112
7. Identification of all erosion and sediment control practices and pollution prevention measures
that need repair or maintenance; and
8. Identification of all erosion and sediment control practices and pollution prevention measures
that were not installed properly or are not functioning as designed and need to be reinstalled
or replaced; and
9. Description and sketch (map) of areas with active soil disturbance activity, areas that have
been disturbed but are inactive at the time of the inspection, and areas that have been
stabilized (temporary and/or final) since the last inspection; and
10. Estimates, in square feet or acres, of the following areas:
a. Total area with active soil disturbance (not requiring either temporary stabilization or
final stabilization); and
b. Total area with inactive soil disturbance (requiring either temporary stabilization or
final stabilization); and
c. Total area that has achieved temporary stabilization; and
d. Total area that has achieved final stabilization; and
11. Current stage of construction of all SMPs and identification of all construction activity on site
that is not in conformance with the SWPPP and technical standards; and
12. Corrective action(s) that must be taken to install, repair, replace or maintain erosion and
sediment control practices and pollution prevention measures; and to correct deficiencies
identified with the construction of the SMP(s); and
13. Identification and status of all corrective actions that were required by previous inspection;
and
14. Digital photographs, with date stamp, that clearly show the condition of all practices that have
been identified as needing corrective actions. The qualified inspector must attach color copies
of the digital photographs to the inspection report being maintained onsite within seven (7)
calendar days of the date of the inspection. The qualified inspector must also take digital
photographs, with date stamp, that clearly show the condition of the practice(s) after the
corrective action has been completed. The qualified inspector must attach paper color copies
of the digital photographs to the inspection report that documents the completion of the
corrective action work within seven (7) calendar days of that inspection.
6.2.2 Site Log Book
Pursuant to Part I.E.3 of GP-0-25-001, the Owner/Operator shall retain a copy of the General Permit,
NOI, NOI Acknowledgment Letter, MS4 SWPPP Acceptance Form (if applicable), inspection reports,
contractor and subcontractor certification forms, and all documentation necessary to demonstrate
eligibility under the permit, at the construction site from commencement of construction activity until
the date that all areas of disturbance have achieved final stabilization and the Notice of Termination
has been submitted to the NYSDEC.
The Site Log Book shall be maintained on-site in a secure location (i.e. job trailer, on-site construction
office, or mailbox with lock) and must be accessible during normal business hours to an individual
performing a compliance inspection.
Stormwater Pollution Prevention Plan
Page 25
2241067
Page 112 of 359
Page 113
6.2.3 Post Construction Records and Archiving
Following construction, the Owner/Operator shall retain copies of the SWPPP, the complete
construction Site Log Book, and records of all data used to complete the NOI to be covered by this
permit, for a period of at least five years from the date that the site is finally stabilized. This period may
be extended by the NYSDEC, at its sole discretion, at any time upon written notification.
Records shall be maintained of all post construction inspections and maintenance work performed in
accordance with the requirements outlined in Appendix G.
7.0 SWPPP IMPLEMENTATION RESPONSIBILITIES
A summary of the responsibilities and obligations of all parties involved with compliance with the
NYSDEC SPDES General Permit GP-0-25-001 conditions is outlined in the subsequent sections. For a
complete listing of the definitions, responsibilities, and obligations, refer to the SPDES General Permit
GP-0-25-001 presented in Appendix J.
7.1 Owner’s/Operator's Responsibilities
1. Ensure that control measures are selected, designed, installed, implemented and maintained
to minimize the discharge of pollutants and prevent a violation of the water quality standards,
meeting the non-numeric effluent limitations in Part II.B.1.(a)-(e) of the SPDES General Permit
and in accordance with the New York State Standards and Specifications for Erosion and
Sediment Control, dated November 2016.
2. Ensure that practices are selected, designed, installed, and maintained to meet the
performance criteria in the Design Manual. Practices must be designed to meet the applicable
sizing criteria in Part II.C.2.a., b., c. or d. of GP-0-25-001.
3. Retain the services of a “Qualified Inspector” or “Qualified Professional” as defined under GP-
0-25-001, to provide the services outlined in Section 7.5 “Qualified Inspector’s/Qualified
Professional’s Responsibilities.”
4. Retain the services of a “Qualified Professional,” as defined under GP-0-25-001, to provide
the services outlined in Section 2.3 “Owner’s/Operator’s Engineers Responsibilities.”
5. Have an authorized corporate officer sign the Owner/Operator Certification Form to
accompany the eNOI. A copy of the completed NOI is included in Appendix B.
6. Submit the electronic version of the NOI (eNOI) along with the MS4 SWPPP acceptance form
using the NYSDEC’s website (http://www.dec.ny.gov/chemical/43133.html).
7. Pay the required initial and annual fees upon receipt of invoices from NYSDEC. These invoices
are generally issued in the fall of each year. The initial fee is calculated as $110.00 per acre
disturbed plus $675.00 per acre of net increase in impervious cover, and the annual fee is
$110.00.
8. Prior to the commencement of construction activity, identify the contractor(s) and
subcontractor(s) that will be responsible for installing, constructing, repairing, replacing,
inspecting, and maintaining the erosion control practices included in the SWPPP and the
Stormwater Pollution Prevention Plan
Page 26
2241067
Page 113 of 359
Page 114
contractor(s) and subcontractor(s) that will be responsible for constructing the SMPs included
in the SWPPP. Each of the contractors and subcontractors must identify at least one person
from their company to be the trained contractor that will be responsible for implementation of
the SWPPP. Ensure that at least one trained contractor is on site daily when soil disturbance
activities are being performed.
9. Schedule a pre-construction meeting which shall include the Town of West Seneca
representative, Owner’s/Operator’s Engineer, Qualified Inspector, Contractor, and their sub-
contractors to discuss responsibilities as they relate to the implementation of this SWPPP.
10. Retain the services of an independent certified materials testing and inspection firm operating
under the direction of a licensed Professional Engineer to perform regular tests, inspections,
and certifications of the construction materials used in the construction of all post-construction
stormwater management practices.
11. Retain the services of a NYS licensed land surveyor to perform an as-built topographic survey
of the completed post-construction stormwater management facilities.
12. Require the Contractor to fully implement the SWPPP prepared for the site by the
Owner/Operator’s Engineer to ensure that the provisions of the SWPPP are implemented from
the commencement of construction activity until all areas of disturbance have achieved final
stabilization and the Notice of Termination (NOT) has been submitted to the NYSDEC.
13. The Owner/Operator is authorized to commence construction activity as of the authorization
date indicated in the Letter of Authorization (LOA), which is sent by NYSDEC after a complete
eNOI is submitted.
14. Within five (5) business days of receipt of the LOA, send an electronic copy of the LOA to the
MS4 operator(s) with review authority.
15. Forward a copy of the LOA received from DEC to the Owner’s/Operator’s Engineer for project
records, and to the Contractor for display at the construction site.
16. As of the date the LOA is received, the Owner/Operator must make the eNOI, SWPPP and LOA
available for review and copying in accordance with the requirements in Part VII.H. of GP-0-25-
001. When applicable, as of the date an updated LOA is received, the Owner/Operator must
make the updated LOA available for review and copying in accordance with the requirements
in Part VII.H.
17. The Owner/Operator must ensure compliance with all requirements of GP-0-25-001 and that
the provisions of the SWPPP, including any changes made to the SWPPP in accordance with
Part III.A.5., are properly implemented and maintained from the commencement of
construction activity until all area of disturbance have achieved final stabilization; and the
Owner/Operator’s coverage under the permit is terminated in accordance with Part V.A.5.a.
18. As of the date of the commencement of construction activities until Part I.E.2.a. and b. have
been met, the Owner/Operator must maintain at the construction site, a copy of all
documentation necessary to demonstrate eligibility with GP-0-25-001, a copy of GP-0-25-001,
the SWPPP, the signed SWPPP Preparer Certification Form, the signed MS4 SWPPP
Acceptance Form, signed Owner/Operator Certification Form, eNOI, and LOA, and LOA
transmittal to the MS4 Operator in accordance with Part I.D.3.c.
Stormwater Pollution Prevention Plan
Page 27
2241067
Page 114 of 359
Page 115
19. The Owner/Operator must maintain at the construction site, until Part I.E.2.a and b. have been
met, as of the date the documents become final or are received, a copy of the responsible
contractor’s or subcontractor's certification statement(s) in accordance with Part III.A.7, and
inspection reports in accordance with Part IV.C.4. and 6.
20. The Owner/Operator must maintain the documents in a secure location, such as a job trailer,
on-site construction office, or mailbox with lock. The secure location must be accessible during
normal business hours to an individual performing a compliance inspection. The documents
must be paper documents unless electronic documents are accessible to the inspector during
an inspection to the same extent as a paper copy stored at the site would be. If electronic
documents are kept on site, the Owner/Operator must maintain functional equipment on site
available to an inspector during normal hours of operation such that an inspector may view
the electronic documents in a format that can be read in a similar manner as a paper record
and in a legally dependable format with no less evidentiary value than their paper equivalent.
21. Upon finding a significant non-compliance with the practices described in the SWPPP or
violation of GP-0-25-001, NYSDEC may order an immediate stop to all construction activity at
the site until the non-compliance is remedied. The stop work order must be in writing, describe
the non-compliance in detail, and be sent to the Owner/Operator. Forward a copy of any stop
work order received immediately to the Owner’s/Operator’s Engineer and to the Contractor.
22. If any human remains or archaeological remains are encountered during excavation, the
Owner/Operator must immediately cease, or cause to cease, all construction activity in the
area of the remains and notify the appropriate Regional Water Engineer (RWE). Construction
activity shall not resume until written permission to do so has been received from the RWE.
23. To be authorized to implement modifications to the information previously submitted in the
eNOI, the Owner/Operator must notify NYSDEC via email at [email protected]
requesting access to update the eNOI, update the eNOI to reflect the modifications and
resubmit the eNOI in accordance with Part I.D., and receive an updated LOA.
24. The eNOI, SWPPP, LOA, updated LOAs, and inspection reports required by GP-0-25-001 are
public documents that the Owner/Operator must make available for review and copying by any
person within five (5) business days of the Owner/Operator receiving a written request by any
such person to review these documents. Copying of documents will be done at the requester’s
expense.
25. The Owner/Operator must terminate coverage when the project reaches total project
completion, has a planned shutdown with partial project completion, is changing
Owner/Operator or has obtained coverage under an alternative general SPDES permit or an
individual SPDES permit.
26. Have a qualified inspector perform a final site inspection prior to submitting the eNOT.
27. Have the MS4 sign the MS4 Acceptance statement on the eNOT in accordance with the
requirements in Part VII.J.
28. Prior to submitting a Notice of Termination, ensure for SMP(s) that are privately owned, the
Owner/Operator has a mechanism in place that requires operation and maintenance of the
practice(s) in accordance with the operation and maintenance plan, such as a deed covenant
in the Owner/Operator’s deed of record.
Stormwater Pollution Prevention Plan
Page 28
2241067
Page 115 of 359
Page 116
29. Submit a complete Notice of Termination form electronically using the NYSDEC eNOT.
Coverage is terminated as of the termination date indicated in the Letter of Termination (LOT),
which is sent by NYSDEC after a complete eNOT is submitted.
30. Request and receive all SWPPP records from the Owner’s/Operator’s Engineer and archive
those records, along with the LOT, for a period of at least five (5) years from the date that
NYSDEC accepts a complete NOT submitted.
31. Implement the Post-Construction Inspections and Maintenance procedures outlined in
Appendix G.
32. The Owner/Operator must keep the SWPPP current so that it at all times accurately documents
the erosion and sediment controls practices that are being used or will be used during
construction, and all post-construction stormwater management practices that will be
constructed on the site. At a minimum, the Owner/Operator shall amend the SWPPP, including
construction drawings:
a) Whenever the current provisions prove to be ineffective in minimizing pollutants in
stormwater discharges from the project site;
b) Whenever there is a change in design, construction, or operation at the construction
site that has or could have an effect on the discharge of pollutants; and
c) To address issues or deficiencies identified during an inspection by the “Qualified
Inspector,” the Department, or other Regulatory Authority.
d) To document the final construction conditions.
33. When property ownership changes or when there is a change in operational control over the
construction plans and specifications, the original owner or operator must notify the new owner
or operator, in writing, of the requirement to obtain permit coverage by submitting a NOI with
the Department, in conformance with Part I.G.. For construction activities subject to the
requirements of a regulated, traditional land use control MS4, the original owner or operator
must also notify the MS4, in writing, of the change in ownership at least 30 calendar days prior
to the change in ownership.
7.2 Owner’s/Operator’s Engineer’s Responsibilities
1. Prepare the SWPPP using good engineering practices, best management practices, and in
compliance with all federal, state, and local regulatory requirements.
2. Prepare the electronic Notice of Intent (eNOI) (see Appendix B) and sign the “SWPPP Preparer
Certification Form.” Forward the Owner/Operator Certification Form to the Owner/Operator for
signature.
3. Provide copies of the SWPPP to the Town of West Seneca once all signatures and attachments
are complete.
4. Enter Contractor’s information in Section 7.5 “SWPPP Participants” once a Contractor is
selected by the Owner/Operator.
5. Participate in a pre-construction meeting which shall include the Town of West Seneca
representative, Owner/Operator, Qualified Inspector, Contractor, and all subcontractors to
discuss responsibilities as they relate to the implementation of this SWPPP.
Stormwater Pollution Prevention Plan
Page 29
2241067
Page 116 of 359
Page 117
6. Update the SWPPP each time there is a significant modification to the pollution prevention
measures or a change of the principal Contractor working on the project who may disturb site
soil.
7.3 Contractor's Responsibilities
1. Sign the SWPPP Contractor's Certification Form contained within Appendix B and forward to
the Owner’s/Operator’s Engineer for inclusion in the Site Log Book.
2. Identify at least one Trained Contractor that will be responsible for implementation of this
SWPPP. Ensure that at least one Trained Contractor is on site on a daily basis when soil
disturbance activities are being performed. The Trained Contractor shall inspect the erosion
and sediment control practices and pollution prevention measures being implemented within
the active work area daily to ensure that they are being maintained in effective operating
conditions at all times. For corrective actions not requiring engineering design, the contractor
must begin implementing corrective actions within one business day and complete the
corrective actions within five business days. For corrective actions requiring engineering
design, the engineering design process must begin within five business days and the
contractor must complete the corrective action in a reasonable time frame but no later than
60 calendar days.
3. Provide the names and addresses of all subcontractors working on the project site. Require all
subcontractors who will be involved with construction activities that will result in soil
disturbance to identify at least one Trained Contractor that will be on site on a daily basis when
soil disturbance activities are being performed; and to sign a copy of the Subcontractor’s
Certification Form contained within Appendix B, then forward to the Owner’s/Operator’s
Engineer for inclusion into the Site Log Book. This information must be retained as part of the
Site Log Book.
4. Maintain a Spill Prevention and Response Plan in accordance with requirements outlined in
Section 5 of this SWPPP. This plan shall be provided to the Owner’s/Operator’s Engineer for
inclusion in the Site Log Book, prior to mobilization on-site.
5. Participate in a pre-construction meeting which shall include the Town of West Seneca
representative, Owner/Operator, Owner’s/Operator’s Engineer, Qualified Inspector, and all
subcontractors to discuss responsibilities as they relate to the implementation of this SWPPP.
6. If Contractor plans on utilizing adjacent properties for material, waste, borrow, or equipment
storage areas, or if Contractor plans to engage in industrial activity other than construction
(such as operating asphalt and/or concrete plants) at the site, Contractor shall submit
appropriate documentation to the Owner’s/Operator’s Engineer so that the SWPPP can be
modified accordingly.
7. Implement site stabilization, erosion and sediment control measures, and other requirements
of the SWPPP.
8. In accordance with the requirements in the most current version of the NYS Standards and
Specifications for Erosion and Sediment Control, conduct inspections of erosion and sediment
control measures installed at the site to ensure that they remain in effective operating
condition at all times. Prepare and retain written documentation of inspections as well as of
Stormwater Pollution Prevention Plan
Page 30
2241067
Page 117 of 359
Page 118
all repairs/maintenance activities performed. This information must be retained as part of the
Site Log Book.
9. Begin implementing corrective actions within one (1) business day of receipt of notification by
the Qualified Inspector/Qualified Professional of any corrective actions. For corrective actions
not requiring engineering design, the contractor must begin implementing corrective actions
within one business day and complete the corrective actions within five business days. For
corrective actions requiring engineering design, the engineering design process must begin
within five business days and the contractor must complete the corrective action in a
reasonable time frame but no later than 60 calendar days.
10. Maintain a record of the date(s) and location(s) that soil restoration is performed in accordance
with the accompanying plans and NYSDEC Division of Water’s publication “Deep-Ripping and
Decompaction,” dated April 2008. A copy of this publication is provided in Appendix H. The
record that is to be maintained shall be a copy of the overall site grading plan delineating the
area(s) and date(s) that the soil was restored.
11. Upon completion of all construction at the site, the contractor responsible for overall SWPPP
Compliance shall sign the certification on their Contractor Certification Form indicating that:
a.) all temporary erosion and sediment control measures have been removed from the site, b.)
the on-site soils disturbed by construction activity have been restored in accordance with the
SWPPP and the NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction,”
and c.) all permanent stormwater management practices required by the SWPPP have been
installed in accordance with the contract documents.
7.4 Qualified Inspector’s/Qualified Professional’s Responsibilities
1. Participate in a pre-construction meeting with the Town of West Seneca representative,
Owner/Operator, Owner/Operator’s Engineer, Contractor, and their subcontractors to discuss
responsibilities as they relate to the implementation of this SWPPP.
2. Conduct an initial assessment of the site prior to the commencement of construction and
certify in an inspection report that the appropriate erosion and sediment control measures
described within this SWPPP have been adequately installed and implemented to ensure
overall preparedness of the site.
3. Provide on-site inspections to determine compliance with the SWPPP. Site inspections shall
occur at an interval of at least once every seven calendar days. A written inspection report
shall be provided to the Owner/Operator and general contractor within one business day of
the completion of the inspection, with any deficiencies identified. A sample inspection form is
provided in Appendix F.
4. Prepare an inspection report subsequent to each and every inspection that shall
include/address the items listed in Part IV.C.4 of GP-0-25-001. Sign all inspection reports and
maintain on site with the SWPPP.
5. Notify the owner/operator and appropriate contractor or subcontractor of any corrective
actions that need to be taken.
Stormwater Pollution Prevention Plan
Page 31
2241067
Page 118 of 359
Page 119
6. Prepare a construction Site Log Book to be used as a record of all inspection reports generated
throughout the duration of construction. Ensure that the construction Site Log Book is
maintained and kept up-to-date throughout the duration of construction.
7. Review the Contractor’s SWPPP records on a periodic basis to ensure compliance with the
requirements for daily reports, soil restoration, inspections, and maintenance logs.
8. Based on the as-built survey and material testing certifications performed by others, the
Qualified Professional shall perform evaluations of the completed stormwater management
practices to determine whether they were constructed in accordance with this SWPPP.
9. The Qualified Professional shall conduct a final site assessment and prepare a certification
letter to the Owner/Operator indicating that, upon review of the material testing and inspection
reports prepared by the firm retained by the Owner/Operator, review of the completed
topographic survey, and evaluation of the completed stormwater management facilities, the
stormwater management facilities have been constructed substantially in accordance with the
contract documents and should function as designed.
10. Prepare the Notice of Termination (NOT). The Qualified Professional shall sign the NOT
Certifications VI (Final Stabilization) and VII (Post-construction Stormwater Management
Practices) and forward the NOT to the Owner/Operator for signature on Certification VIII
(Owner/Operator Certification).
11. The owner’s or operator’s coverage is terminated as of the termination date indicated in the
Letter of Termination (LOT), which is sent by NYSDEC after a complete eNOT is submitted.
12. Transfer the SWPPP documents, along with all NOI's, LOA, permit certificates, NOT's, LOT,
construction Site Log Book, and written records required by the General Permit to the
Owner/Operator for archiving.
Stormwater Pollution Prevention Plan
Page 32
2241067
Page 119 of 359
Page 120
7.5 SWPPP Participants
1. Owner’s/Operator’s Engineer 3: Kristopher Winkler, PE
LaBella Associates, DPC
300 Pearl Street, Suite 130
Buffalo, NY 14202
Phone: (716) 483-3153
2. Owner/Operator 4: Home Leasing
75 South Clinton Avenue, Suite 700,
Rochester, NY 14604
Phone: 585-262-6210
3. Contractor5,6: Name and Title:
Company Name:
Mailing Address:
Phone:
Fax:
3
Refer to Appendix B for the SWPPP Preparer Certification Form.
4
Refer to Appendix B for the Owner/Operator Certification Form.
5
Refer to Appendix B for Contractor and Subcontractor Certification Form.
6
Contractor’s information to be entered once the Contractor has been selected.
Stormwater Pollution Prevention Plan
Page 33
2241067
Page 120 of 359
Page 121
Page 121 of 359
Page 122
Appendix A :
FIGURES
A-1: Site Location Map
A-2: Soils Map
A-3: Historic Places Screening Map
A-4: Environmental Resource Map
A-5: Environmental Review Documentation
A-6: FEMA Firm Map
A-7: Pre-Development Watershed Delineation Map
A-8: Post-Development Watershed Delineation Map
Page 122 of 359
Page 123
Page 123 of 359
Page 124
HARLEM ROAD
D
R OA
EK
RE
G AC
YU
CA
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
PROJECT LOCATION
cts\92100-92199\92112.00 - CONFIDENTIAL - WOH Gross Wetland Violation\DWG\9
CLIN
TON
STR
EET
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:40 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SITE LOCATION MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-1
Page 124 of 359
Page 125
Page 125 of 359
Page 126
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:42 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS MAP 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2a
Page 126 of 359
Page 127
Page 127 of 359
Page 128
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appen
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:43 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS LEGEND -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2b
Page 128 of 359
Page 129
Page 129 of 359
Page 130
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:45 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS TABLE -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2c
Page 130 of 359
Page 131
Page 131 of 359
Page 132
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
Missing or invalid reference It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:45 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
SWPPP FIGURE - NOT FOR CONSTRUCTION
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
File: ..\references\A-3 Historic Places Screening Map (CRIS)\Titleblock - 8
DRAWING NAME:
date of such alteration, and a specific description of the alteration.
DRAWN BY: DATE: PROJECT NO.:
HISTORIC PLACES SCREENING MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-3
Page 132 of 359
Page 133
Page 133 of 359
Page 134
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:47 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
ENVIRONMENTAL RESOURCE MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-4
Page 134 of 359
Page 135
Page 135 of 359
Page 136
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appen
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:50 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
FEMA FIRM MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-5
Page 136 of 359
Page 137
Page 137 of 359
Page 138
Page 138 of 359
Page 139
Page 139 of 359
Page 140
Page 140 of 359
Page 141
Page 141 of 359
Page 142
Page 142 of 359
Page 143
Page 143 of 359
Page 144
AP-1
593.19
594.95
594.92 602.49
602.51
ES-1
ES-2
DS
DS
600.04
FLAG
POLE
MB
LEGEND
SUBCATCHMENT BOUNDARY
Tc PATH
# SUBCATCHMENT
# REACH
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:59:33 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and SWPPP FIGURE - NOT FOR CONSTRUCTION
N DRAWING NAME:
date of such alteration, and a specific description of the alteration.
DRAWN BY: DATE: PROJECT NO.:
PRE-DEVELOPMENT WATERSHED DELINEATION MAP 04/20/2026 2241067
VERSION 21.1
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2026 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON STREET, BUFFALO, NY 14224
A-6
Page 144 of 359
Page 145
Page 145 of 359
Page 146
AP-1
593.19
600.14
PS-7 599
600
601
PS-1
594.92 599 602.51
600
599
598
60
600
598
599
599
600
600
597
09098
597
598
599
1
600
6559
60
0
600
PS-6
600
600
598
599
599
600
600
595
596
597
598
600
600
PS-5
599
600599
FFE=600.75'
55 98765
600
60909
59
600 600
60
600
0
599
599
600
599
PS-2 599
59
599
9
599 599
599
595
596
598
597
600
600
598
599
598
599
599
DS
600
PS-3
DS
559998778
600
559
559999876
00 5599678
6
600
PS-4
59 559998766 PS-8
59
9 5599789 599.84
9
598
59 8
7 5
5965
59
595
598.87 9
59678
59 59
99
55595678
559 9998765
598
LEGEND
606.31 607.17
SUBCATCHMENT BOUNDARY
Tc PATH
# SUBCATCHMENT
# REACH
POND
#
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 11:02:52 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
N altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
POST-DEVELOPMENT WATERSHED DELINEATION MAP 04/20/2026 2241067
VERSION 21.1
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2026 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON STREET, BUFFALO, NY 14224
A-7
Page 146 of 359
Page 147
Page 147 of 359
Page 148
Appendix B :
FORMS
Notice of Intent (NOI) Draft
MS4 SWPPP Acceptance Form
SWPPP Preparer Certification Form
Owner/Operator Certification Form
Contractor and Subcontractor Certification Forms
Notice of Termination (NOT)
Page 148 of 359
Page 149
Page 149 of 359
Page 150
MS4 SWPPP Acceptance Form
for construction activities seeking authorization under the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI
and submitted to NYSDEC electronically.)
I. Project Owner/Operator Information
1. Owner/Operator Name:
2. Contact Person:
3. Street Address:
4. City/State/Zip:
II. Project Site Information
5. Project/Site Name:
6. Street Address:
7. City/State/Zip:
III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance Information
8. SWPPP Reviewed by:
9. Title/Position:
10. Date Final SWPPP Reviewed and Accepted:
IV. Regulated MS4 Information
11. Name of MS4 Operator:
12. MS4 SPDES Permit Identification Number: NYR20A
13. Street Address:
14. City/State/Zip:
15. Telephone Number:
Page 1 of 2
Page 150 of 359
Page 151
MS4 SWPPP Acceptance Form - continued
V. Certification Statement - MS4 Official (principal executive officer or ranking elected official) or
Duly Authorized Representative
I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project
identified in section II. of this form has been reviewed and meets the substantive requirements in the
SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP).
Note: The MS4 Operator, through the acceptance of the SWPPP, assumes no responsibility for the
accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of
the SWPPP by the MS4 Operator does not relieve the owner/operator or their SWPPP preparer of
responsibility or liability for errors or omissions in the plan.
Printed Name1:
Title/Position:
Signature:
Date:
VI. Additional Information
1 Printed name of the principal executive officer or ranking elected official for the MS4 Operator or their
duly authorized representative in accordance with CGP Part VII.J.2.
(NYSDEC - MS4 SWPPP Acceptance Form - January 2025)
Page 2 of 2
Page 151 of 359
Page 152
SWPPP Preparer Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and
submitted to NYSDEC electronically.)
Project/Site Name:
eNOI Submission ID:
Owner/Operator Name:
Certification Statement – SWPPP Preparer
I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) has been
prepared in accordance with the requirements of GP-0-25-001. I certify under penalty
of law that the SWPPP and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge
and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
SWPPP Preparer First Name MI SWPPP Preparer Last Name
Signature Date
Revised: January 2025
Page 152 of 359
Page 153
Owner/Operator Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b. or Part I.F.2. and 3., the completed form must be attached to the eNOI or the
Request to Continue Coverage, and submitted to NYSDEC electronically.
Project/Site Name: ________________________________________________________
eNOI Submission ID: _________________________________________________
eNOI Submitted by: Owner/Operator SWPPP Preparer Other
Certification Statement - Owner/Operator
I hereby certify that I read, and will comply with, the GP-0-25-001 permit requirements. I understand that
authorization to discharge under the permit for the project/site named above is dependent on receipt of a
Letter of Authorization (LOA) or a Letter of Continued Coverage (LOCC) from the New York State
Department of Environmental Conservation (NYSDEC) in accordance with CGP Part I.D.3.b. or Part I.F.4.
I am aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.
Owner/Operator First Name MI Owner/Operator Last Name
___________________________________________________________
Signature
________________________________
Date
Revised: January 2025
Page 153 of 359
Page 154
Stormwater Pollution Prevention Plan
Contractor Certification Statement
(Responsible for overall SWPPP Compliance)
West Seneca
Town of West Seneca, Erie County, New York
This is to certify that the following contracting firm will be responsible for installing, constructing, repairing, inspecting and/or
maintaining the erosion and sediment control practices and post-construction stormwater management control practices
required by the SWPPP.
Contracting Firm Information
Name:
Address:
Telephone & Fax:
Trained Contractor(s) 1 Responsible for SWPPP Implementation (Provide name, title, and date of last training)
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
Prior to commencement of construction activity, the following certification shall be issued:
I hereby certify under penalty of law that I understand and agree to comply with the requirements of the SWPPP and agree to
implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner
or operator must comply with the requirements of the most current version of the New York State Pollutant Discharge
Elimination System (SPDES) Construction General Permit (CGP) for Stormwater Discharges from Construction Activities and
that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that
there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine
and imprisonment for knowing violations
Printed Name:
Title/Position:
Signature: Date:
Upon completion of construction activities, the following certification shall be issued, prior to issuance of the NOT:
I hereby certify that that all permanent stormwater management practices required by the SWPPP have been installed in
accordance with the contract documents. I further certify that all temporary erosion and sediment control measures have
been removed from the site, and that the on-site soils disturbed by construction activity have been restored in accordance
with the SWPPP and the NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction”.
Printed Name:
Title/Position:
Signature: Date:
1 “Trained Contractor” means an employee from a contracting (construction) company that has received four (4) hours of Department endorsed training in proper erosion and sediment
control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the “trained contractor” shall receive four (4)
hours of training every three (3) years. It can also mean an employee from the contracting (construction) company that meets the “qualified inspector” qualifications (e.g. licensed
Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registe red Landscape Architect, provided they
have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil an d Water Conservation District, or other Department
endorsed entity). The “Trained Contractor” will be responsible for the day to day implementation of the SWPPP.
Page 154 of 359
Page 155
Stormwater Pollution Prevention Plan
Subcontractor Certification Statement
(whose work involves soil disturbance)
West Seneca
Town of West Seneca, Erie County, New York
Each Subcontractor whose work will involve soil disturbance of any kind is required to complete and sign this Certification
Statement before commencing any construction activity at the site. This completed Certification Statement(s) shall be
maintained at the construction site in the Site Log Book.
Subcontracting Firm Information
Name:
Address:
Telephone & Fax:
Trained Contractor(s) 2 Responsible for SWPPP Implementation (Provide name, title, and date of last training)
Prior to commencement of construction activities, the following certification shall be issued:
I hereby certify under penalty of law that I understand and agree to comply with the requirements of the SWPPP and agree to
implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner
or operator must comply with the requirements of the most current version of the New York State Pollutant Discharge
Elimination System (SPDES) Construction General Permit (CGP) for Stormwater Discharges from Construction Activities and
that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that
there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine
and imprisonment for knowing violations
Printed Name:
Title/Position:
Signature: Date:
2 “Trained Contractor” means an employee from a contracting (construction) company that has received four (4) hours of Department endorsed training in proper erosion and sediment
control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the “trained contractor” shall receive four (4)
hours of training every three (3) years. It can also mean an employee from the contracting (construction) company that meets the “qualified inspector” qualifications (e.g. licensed
Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registe red Landscape Architect, provided they
have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil an d Water Conservation District, or other Department
endorsed entity). The “Trained Contractor” will be responsible for the day to day implementation of the SWPPP.
Page 155 of 359
Page 156
eNOT Owner or Operator Certification
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I certify that I have met the requirements of CGP Part V.A.1., 2., 3., and 4. I certify under
penalty of law that this document and all attachments were prepared under my direction
or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for
knowing violations.
a. Printed name of the Owner or Operator:
b. Title/Position:
c. Signature:
d. Date:
Page 156 of 359
Page 157
eNOT Qualified Inspector Certification – Final Stabilization
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.i., ii., and iii. or CGP Part
V.A.1.b.i., ii., and iii. have been achieved. I certify under penalty of law that this
document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting
false information, including the possibility of fine and imprisonment for knowing
violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 157 of 359
Page 158
eNOT Qualified Inspector Certification – SMPs
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.iv. or CGP Part V.A.1.b.iv.
have been achieved. I certify under penalty of law that this document and all
attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 158 of 359
Page 159
Page 159 of 359
Page 160
Appendix c:
Project evaluation and
design calculations
Page 160 of 359
Page 161
Page 161 of 359
Page 162
P= 1.00 inch
Total Area Existing Imperv Proposed Imperv Existing Disturbed Imperv Reduction
AREA
(Acres) (Acres) (Acres) Imperv Area (Acres) (Acres)
TO ALTERNATIVE PRACTICES 2.13 0.47 1.91 0.47 0%
TO AREA REDUCTION SMPS
SITE REMAINING AREA 3.55 0.59 1.07 0.35 0%
TOTAL SITE 5.68 1.06 2.98 0.82 0%
Water Quality Volume Calculation
Exist Disturbed Imperv Imperv Area (NEW Percent TOTAL WQV
Total Area WQv WQv Adjusted
New Development / Redevelopment WQv Treatment % Area (REDEVELOPMENT) DEVELOPMENT) Impervious Rv REQUIRED System Generated Notes
(Acres) (ft 3 ) (ft 3 )
(Acres) (Acres) % (ft 3 )
REDEVELOPMENT ALTERNATIVE 75% 0.47 0.47 - 100% 0.95 1,621 1,216
NEW DEVELOPMENT ALTERNATIVE 100% 1.66 - 1.44 87% 0.83 5,006 5,006
8,672
REDEVELOPMENT REMAINING AREA 25% 0.35 0.35 - 100% 0.95 1,207 302
NEW DEVELOPMENT REMAINING AREA 100% 3.20 - 0.48 15% 0.19 2,149 2,149
Minimum Runoff Reduction Volume Calculation
Total Impervious Area Added Percent MINIMUM RRv
Weighted S
AREA (NEW DEVELOPMENT) Soil Group A % Soil Group B % Soil Group C % Soil Group D % Impervious Rv REQUIRED System Generated Notes
Factor 3
(Acres) % (ft )
TOTAL SITE 1.92 0% 0% 0% 100% 100% 0.95 0.20 1,324
Page 162 of 359
Page 163
Page 163 of 359
Page 164
Step 2 - Calculate Water Quality Volume
Is this project subject to Section 4.3 of the NYS Design Manual for Enhanced Phosphorus
Removal? No
What is the nature of this construction project? Redevelopment with increase in impervious area
Design Point: 1
Enter 90% Rainfall Event as P
P= 1.00 inches
Calculate Required WQv
Contributing Percent
Drainage Area Impervious Area WQv SMP
Area Impervious Rv
Number (Acres) (cf) Description
(Acres) %
Filtration
1 0.63 0.22 34 0.36 817
Bioretention
Flow Based
2 1.70 1.48 87 0.83 5,144 Alternative
Practice
Filtration
3 0.65 0.22 33 0.35 829
Bioretention
Filtration
4 0.68 0.48 71 0.69 1,692
Bioretention
Flow Based
5 0.43 0.43 100 0.95 1,483 Alternative
Practice
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Total 4.09 2.82 69 0.67 9964 Required WQv
Page 164 of 359
Page 165
Page 165 of 359
Page 166
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
1 0.63 0.22 34 0.36 817 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 340 sf
Enter Provided Filter Area Af 340 sf
Recalculated Water Quality Volume (based on
WQv calc 816 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 326 cf
This is the portion of the WQv that is not reduced in
WQv Treated 491 cf
the practice.
Page 166 of 359
Page 167
Page 167 of 359
Page 168
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
3 0.65 0.22 33 0.35 829 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 345 sf
Enter Provided Filter Area Af 348 sf
Recalculated Water Quality Volume (based on
WQv calc 835.2 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 334 cf
This is the portion of the WQv that is not reduced in
WQv Treated 495 cf
the practice.
Page 168 of 359
Page 169
Page 169 of 359
Page 170
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
4 0.68 0.48 71 0.69 1,692 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 705 sf
Enter Provided Filter Area Af 705 sf
Recalculated Water Quality Volume (based on
WQv calc 1692 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 677 cf
This is the portion of the WQv that is not reduced in
WQv Treated 1015 cf
the practice.
Page 170 of 359
Page 171
Page 171 of 359
Page 172
Water Quality Peak Flow Calclations
NYSDEC Water Quality Volume (WQv) & Water Quality Peak Flow (Qp) Calculation
Worksheet (REQUIRED Qp)
PROJECT INFORMATION
Total Drainage Area A: 2.09 ac
Impervious Area I: 1.90 ac
Percent Impervious 90.9 %
NYSDEC 90% Rainfall P: 1.00 in.
Time of Concentration Tc: 0.27 hrs
Rv: 0.87
WATER QUALITY VOLUME
Water Quality Volume WQv=([(P)*(Rv)*(A)]/12)*43560 WQv: 6,587 cf
WATER QUALITY PEAK FLOW (NEW DEVELOPMENT)
Runoff Volume Q=WQv/(A*3600) Q: 0.87 in.
2 ½
CN=1000/(10+5*P+10*Q-10(Q +1.25*Q*P) ) CN: 98.80
CN Rounded CN: 99
CN < or = 98 CN: 98
Initial Abstraction (Ia=200/CN-2) Ia: 0.04 in.
RATIO R=Ia/P R: 0.04
2
C0 = A*R +B*R +C C0: 2.54
2
C1 = A*R +B*R +C C1: -0.58
2
C2 = A*R +B*R +C C2: -0.17
2
Unit Peak Discharge qu=10^(C0+C1*Log(Tc)+C2*(log(Tc)) ) qu: 663.03 cfs/mi2/in
Water Quality Peak Flow Qp=qu*A*Q/640 (100%) Qp: 1.88 cfs
REDVELOPMENT
Impeverious Area Reduction IC 0.00 %
WQv Treatment by Standard Practice SP 0.00 %
Runoff Reduction RR 0.00 %
Req. WQv% By Alt. Practice AP=(25-(% IC+%SP+%RR))*3: AP 75.0 %
Required Water Quality Peak Flow RD QP=(Qp*AP): RD Qp: 1.41 cfs
Page 1 of 1
Page 172 of 359
Page 173
Page 173 of 359
Page 174
Appendix d:
Pre-development stormwater
modeling
Page 174 of 359
Page 175
Page 175 of 359
Page 176
ES-1
W Site
AP-1
Cayuga Creek
ES-2
E Site
Subcat Reach Pond Link Routing Diagram for D_App D_Pre-Development Model
Prepared by Labella Associates, Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC
Page 176 of 359
Page 177
Page 177 of 359
Page 178
D_App D_Pre-Development Model
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing (selected events)
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-yr NY-West Seneca 24-hr S1 1-yr Default 24.00 1 1.82 2
2 10-yr NY-West Seneca 24-hr S1 10-yr Default 24.00 1 3.14 2
3 100-yr NY-West Seneca 24-hr S1 100-yr Default 24.00 1 5.22 2
Page 178 of 359
Page 179
D_App D_Pre-Development Model
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (selected nodes)
Area CN Description
(acres) (subcatchment-numbers)
10.061 80 >75% Grass cover, Good, HSG D (ES-1, ES-2)
1.056 98 Paved parking, HSG D (ES-1, ES-2)
11.117 82 TOTAL AREA
Page 179 of 359
Page 180
D_App D_Pre-Development Model
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (selected nodes)
Area Soil Subcatchment
(acres) Group Numbers
0.000 HSG A
0.000 HSG B
0.000 HSG C
11.117 HSG D ES-1, ES-2
0.000 Other
11.117 TOTAL AREA
Page 180 of 359
Page 181
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 5
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=0.53"
Flow Length=391' Tc=14.0 min CN=82 Runoff=4.22 cfs 0.344 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=0.49"
Flow Length=390' Tc=19.4 min CN=81 Runoff=1.42 cfs 0.139 af
Reach AP-1: Cayuga Creek Inflow=5.48 cfs 0.483 af
Outflow=5.48 cfs 0.483 af
Total Runoff Area = 11.117 ac Runoff Volume = 0.483 af Average Runoff Depth = 0.52"
90.50% Pervious = 10.061 ac 9.50% Impervious = 1.056 ac
Page 181 of 359
Page 182
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 6
Summary for Subcatchment ES-1: W Site
Runoff = 4.22 cfs @ 12.16 hrs, Volume= 0.344 af, Depth= 0.53"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
Runoff
4.22 cfs
NY-West Seneca 24-hr S1 1-yr
4
Rainfall=1.82"
Runoff Area=337,194 sf
Runoff Volume=0.344 af
3
Runoff Depth=0.53"
Flow (cfs)
Flow Length=391'
Tc=14.0 min
2
CN=82
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 182 of 359
Page 183
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment ES-2: E Site
Runoff = 1.42 cfs @ 12.25 hrs, Volume= 0.139 af, Depth= 0.49"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
1.42 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
Runoff Area=147,058 sf
Runoff Volume=0.139 af
1
Runoff Depth=0.49"
Flow (cfs)
Flow Length=390'
Tc=19.4 min
CN=81
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 183 of 359
Page 184
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Reach AP-1: Cayuga Creek
Inflow Area = 11.117 ac, 9.50% Impervious, Inflow Depth = 0.52" for 1-yr event
Inflow = 5.48 cfs @ 12.18 hrs, Volume= 0.483 af
Outflow = 5.48 cfs @ 12.18 hrs, Volume= 0.483 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
5.48 cfs Outflow
6 5.48 cfs
Inflow Area=11.117 ac
5
4
Flow (cfs)
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 184 of 359
Page 185
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 9
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=1.49"
Flow Length=391' Tc=14.0 min CN=82 Runoff=12.32 cfs 0.961 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=1.42"
Flow Length=390' Tc=19.4 min CN=81 Runoff=4.40 cfs 0.400 af
Reach AP-1: Cayuga Creek Inflow=16.27 cfs 1.361 af
Outflow=16.27 cfs 1.361 af
Total Runoff Area = 11.117 ac Runoff Volume = 1.361 af Average Runoff Depth = 1.47"
90.50% Pervious = 10.061 ac 9.50% Impervious = 1.056 ac
Page 185 of 359
Page 186
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment ES-1: W Site
Runoff = 12.32 cfs @ 12.15 hrs, Volume= 0.961 af, Depth= 1.49"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
Runoff
13 12.32 cfs
12 NY-West Seneca 24-hr S1 10-yr
11 Rainfall=3.14"
10
Runoff Area=337,194 sf
Runoff Volume=0.961 af
9
Runoff Depth=1.49"
8
Flow (cfs)
Flow Length=391'
7
Tc=14.0 min
6
CN=82
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 186 of 359
Page 187
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment ES-2: E Site
Runoff = 4.40 cfs @ 12.23 hrs, Volume= 0.400 af, Depth= 1.42"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
4.40 cfs
NY-West Seneca 24-hr S1 10-yr
4 Rainfall=3.14"
Runoff Area=147,058 sf
Runoff Volume=0.400 af
3 Runoff Depth=1.42"
Flow (cfs)
Flow Length=390'
Tc=19.4 min
2 CN=81
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 187 of 359
Page 188
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 12
Summary for Reach AP-1: Cayuga Creek
Inflow Area = 11.117 ac, 9.50% Impervious, Inflow Depth = 1.47" for 10-yr event
Inflow = 16.27 cfs @ 12.17 hrs, Volume= 1.361 af
Outflow = 16.27 cfs @ 12.17 hrs, Volume= 1.361 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
18 16.27 cfs Outflow
16.27 cfs
17
16
Inflow Area=11.117 ac
15
14
13
12
11
Flow (cfs)
10
9
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 188 of 359
Page 189
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 13
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=3.28"
Flow Length=391' Tc=14.0 min CN=82 Runoff=27.59 cfs 2.114 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=3.18"
Flow Length=390' Tc=19.4 min CN=81 Runoff=10.17 cfs 0.895 af
Reach AP-1: Cayuga Creek Inflow=36.80 cfs 3.008 af
Outflow=36.80 cfs 3.008 af
Total Runoff Area = 11.117 ac Runoff Volume = 3.008 af Average Runoff Depth = 3.25"
90.50% Pervious = 10.061 ac 9.50% Impervious = 1.056 ac
Page 189 of 359
Page 190
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 14
Summary for Subcatchment ES-1: W Site
Runoff = 27.59 cfs @ 12.15 hrs, Volume= 2.114 af, Depth= 3.28"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
30 Runoff
27.59 cfs
28
NY-West Seneca 24-hr S1 100-yr
26
Rainfall=5.22"
24
Runoff Area=337,194 sf
22
Runoff Volume=2.114 af
20
Runoff Depth=3.28"
18
Flow Length=391'
Flow (cfs)
16
Tc=14.0 min
14
CN=82
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 190 of 359
Page 191
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 15
Summary for Subcatchment ES-2: E Site
Runoff = 10.17 cfs @ 12.22 hrs, Volume= 0.895 af, Depth= 3.18"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
11 10.17 cfs
10 NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
9
Runoff Area=147,058 sf
8 Runoff Volume=0.895 af
7 Runoff Depth=3.18"
Flow Length=390'
Flow (cfs)
6
Tc=19.4 min
5 CN=81
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 191 of 359
Page 192
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 16
Summary for Reach AP-1: Cayuga Creek
Inflow Area = 11.117 ac, 9.50% Impervious, Inflow Depth = 3.25" for 100-yr event
Inflow = 36.80 cfs @ 12.16 hrs, Volume= 3.008 af
Outflow = 36.80 cfs @ 12.16 hrs, Volume= 3.008 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
36.80 cfs Outflow
40 36.80 cfs
38
36
Inflow Area=11.117 ac
34
32
30
28
26
24
Flow (cfs)
22
20
18
16
14
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 192 of 359
Page 193
D_App D_Pre-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 17
Events for Subcatchment ES-1: W Site
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 4.22 0.344 0.53
10-yr 3.14 12.32 0.961 1.49
100-yr 5.22 27.59 2.114 3.28
Page 193 of 359
Page 194
D_App D_Pre-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 18
Events for Subcatchment ES-2: E Site
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 1.42 0.139 0.49
10-yr 3.14 4.40 0.400 1.42
100-yr 5.22 10.17 0.895 3.18
Page 194 of 359
Page 195
D_App D_Pre-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 19
Events for Reach AP-1: Cayuga Creek
Event Inflow Outflow Elevation Storage
(cfs) (cfs) (feet) (cubic-feet)
1-yr 5.48 5.48 0.00 0
10-yr 16.27 16.27 0.00 0
100-yr 36.80 36.80 0.00 0
Page 195 of 359
Page 196
Appendix e:
Post development stormwater
modeling
Page 196 of 359
Page 197
Page 197 of 359
Page 198
PS-1 BIO-1
Filtration Bioretention
PS-6
PS-2
CH-1 DP-1 PS-7
Chambers Design Point
PS-5
PS-8
PS-3 BIO-2
Filtration Bioretention
PS-4 BIO-3
Filtration Bioretention
Subcat Reach Pond Link Routing Diagram for E_App E_Post-Development Model
Prepared by Labella Associates, Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC
Page 198 of 359
Page 199
E_App E_Post-Development Model
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing (selected events)
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-yr NY-West Seneca 24-hr S1 1-yr Default 24.00 1 1.82 2
2 10-yr NY-West Seneca 24-hr S1 10-yr Default 24.00 1 3.14 2
3 100-yr NY-West Seneca 24-hr S1 100-yr Default 24.00 1 5.22 2
Page 199 of 359
Page 200
E_App E_Post-Development Model
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (selected nodes)
Area CN Description
(acres) (subcatchment-numbers)
8.107 80 >75% Grass cover, Good, HSG D (PS-1, PS-2, PS-3, PS-4, PS-7, PS-8)
2.967 98 Paved parking, HSG D (PS-1, PS-2, PS-3, PS-4, PS-5, PS-6)
11.074 85 TOTAL AREA
Page 200 of 359
Page 201
E_App E_Post-Development Model
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (selected nodes)
Area Soil Subcatchment
(acres) Group Numbers
0.000 HSG A
0.000 HSG B
0.000 HSG C
11.074 HSG D PS-1, PS-2, PS-3, PS-4, PS-5, PS-6, PS-7, PS-8
0.000 Other
11.074 TOTAL AREA
Page 201 of 359
Page 202
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 5
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=27,596 sf 33.98% Impervious Runoff Depth=0.72"
Tc=6.0 min CN=86 Runoff=0.72 cfs 0.038 af
Subcatchment PS-2: Runoff Area=72,316 sf 88.61% Impervious Runoff Depth=1.40"
Tc=6.0 min CN=96 Runoff=3.74 cfs 0.194 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=0.72"
Tc=6.0 min CN=86 Runoff=0.74 cfs 0.039 af
Subcatchment PS-4: Runoff Area=29,485 sf 70.98% Impervious Runoff Depth=1.15"
Tc=6.0 min CN=93 Runoff=1.28 cfs 0.065 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=1.60"
Tc=6.0 min CN=98 Runoff=1.06 cfs 0.057 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=1.60"
Tc=6.0 min CN=98 Runoff=0.37 cfs 0.020 af
Subcatchment PS-7: Runoff Area=245,856 sf 0.00% Impervious Runoff Depth=0.46"
Flow Length=391' Tc=14.0 min CN=80 Runoff=2.49 cfs 0.215 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=0.46"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=0.40 cfs 0.047 af
Reach DP-1: Design Point Inflow=4.12 cfs 0.674 af
Outflow=4.12 cfs 0.674 af
Pond BIO-1: Filtration Bioretention Peak Elev=598.98' Storage=994 cf Inflow=0.72 cfs 0.038 af
Primary=0.02 cfs 0.038 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.02 cfs 0.038 af
Pond BIO-2: Filtration Bioretention Peak Elev=596.95' Storage=1,010 cf Inflow=0.74 cfs 0.039 af
Primary=0.02 cfs 0.039 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.02 cfs 0.039 af
Pond BIO-3: Filtration Bioretention Peak Elev=595.92' Storage=1,729 cf Inflow=1.28 cfs 0.065 af
Primary=0.04 cfs 0.065 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.04 cfs 0.065 af
Pond CH-1: Chambers Peak Elev=592.38' Storage=0.079 af Inflow=4.80 cfs 0.251 af
8.0" Round Culvert n=0.013 L=25.0' S=0.0100 '/' Outflow=1.18 cfs 0.251 af
Total Runoff Area = 11.074 ac Runoff Volume = 0.674 af Average Runoff Depth = 0.73"
73.21% Pervious = 8.107 ac 26.79% Impervious = 2.967 ac
Page 202 of 359
Page 203
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 6
Summary for Subcatchment PS-1:
Runoff = 0.72 cfs @ 12.04 hrs, Volume= 0.038 af, Depth= 0.72"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
9,376 98 Paved parking, HSG D
18,220 80 >75% Grass cover, Good, HSG D
27,596 86 Weighted Average
18,220 66.02% Pervious Area
9,376 33.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
0.8 Runoff
0.75
0.72 cfs
0.7 NY-West Seneca 24-hr S1 1-yr
0.65 Rainfall=1.82"
0.6 Runoff Area=27,596 sf
0.55 Runoff Volume=0.038 af
0.5 Runoff Depth=0.72"
Flow (cfs)
0.45 Tc=6.0 min
0.4
CN=86
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 203 of 359
Page 204
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment PS-2:
Runoff = 3.74 cfs @ 12.04 hrs, Volume= 0.194 af, Depth= 1.40"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
64,081 98 Paved parking, HSG D
8,235 80 >75% Grass cover, Good, HSG D
72,316 96 Weighted Average
8,235 11.39% Pervious Area
64,081 88.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
Runoff
4 3.74 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
3
Runoff Area=72,316 sf
Runoff Volume=0.194 af
Runoff Depth=1.40"
Flow (cfs)
Tc=6.0 min
2
CN=96
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 204 of 359
Page 205
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment PS-3:
Runoff = 0.74 cfs @ 12.04 hrs, Volume= 0.039 af, Depth= 0.72"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
0.8 Runoff
0.74 cfs
0.75
NY-West Seneca 24-hr S1 1-yr
0.7
Rainfall=1.82"
0.65
0.6
Runoff Area=28,267 sf
0.55 Runoff Volume=0.039 af
0.5 Runoff Depth=0.72"
Flow (cfs)
0.45 Tc=6.0 min
0.4 CN=86
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 205 of 359
Page 206
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 9
Summary for Subcatchment PS-4:
Runoff = 1.28 cfs @ 12.04 hrs, Volume= 0.065 af, Depth= 1.15"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
8,557 80 >75% Grass cover, Good, HSG D
29,485 93 Weighted Average
8,557 29.02% Pervious Area
20,928 70.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
1.28 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
Runoff Area=29,485 sf
1
Runoff Volume=0.065 af
Runoff Depth=1.15"
Flow (cfs)
Tc=6.0 min
CN=93
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 206 of 359
Page 207
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment PS-5:
Runoff = 1.06 cfs @ 12.04 hrs, Volume= 0.057 af, Depth= 1.60"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
1.06 cfs
NY-West Seneca 24-hr S1 1-yr
1
Rainfall=1.82"
Runoff Area=18,756 sf
Runoff Volume=0.057 af
Runoff Depth=1.60"
Flow (cfs)
Tc=6.0 min
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 207 of 359
Page 208
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment PS-6:
Runoff = 0.37 cfs @ 12.04 hrs, Volume= 0.020 af, Depth= 1.60"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
0.4 0.37 cfs
0.38
0.36
NY-West Seneca 24-hr S1 1-yr
0.34 Rainfall=1.82"
0.32
Runoff Area=6,622 sf
0.3
0.28 Runoff Volume=0.020 af
0.26 Runoff Depth=1.60"
0.24
Flow (cfs)
0.22
Tc=6.0 min
0.2 CN=98
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 208 of 359
Page 209
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 12
Summary for Subcatchment PS-7:
Runoff = 2.49 cfs @ 12.17 hrs, Volume= 0.215 af, Depth= 0.46"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
245,856 80 >75% Grass cover, Good, HSG D
245,856 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
Runoff
2.49 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
2
Runoff Area=245,856 sf
Runoff Volume=0.215 af
Runoff Depth=0.46"
Flow (cfs)
Flow Length=391'
Tc=14.0 min
1
CN=80
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 209 of 359
Page 210
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 13
Summary for Subcatchment PS-8:
Runoff = 0.40 cfs @ 12.36 hrs, Volume= 0.047 af, Depth= 0.46"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
0.44 Runoff
0.42
0.40 cfs
0.4 NY-West Seneca 24-hr S1 1-yr
0.38
0.36 Rainfall=1.82"
0.34 Runoff Area=53,474 sf
0.32
0.3 Runoff Volume=0.047 af
0.28 Runoff Depth=0.46"
0.26
Flow (cfs)
0.24 Flow Length=821'
0.22 Slope=0.0100 '/'
0.2
0.18 Tc=25.7 min
0.16 CN=80
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 210 of 359
Page 211
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 14
Summary for Reach DP-1: Design Point
Inflow Area = 11.074 ac, 26.79% Impervious, Inflow Depth = 0.73" for 1-yr event
Inflow = 4.12 cfs @ 12.18 hrs, Volume= 0.674 af
Outflow = 4.12 cfs @ 12.18 hrs, Volume= 0.674 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
4.12 cfs Outflow
4.12 cfs
Inflow Area=11.074 ac
4
3
Flow (cfs)
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 211 of 359
Page 212
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 15
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.634 ac, 33.98% Impervious, Inflow Depth = 0.72" for 1-yr event
Inflow = 0.72 cfs @ 12.04 hrs, Volume= 0.038 af
Outflow = 0.02 cfs @ 15.87 hrs, Volume= 0.038 af, Atten= 97%, Lag= 229.9 min
Primary = 0.02 cfs @ 15.87 hrs, Volume= 0.038 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 598.98' @ 15.87 hrs Surf.Area= 1,679 sf Storage= 994 cf
Flood Elev= 600.00' Surf.Area= 2,500 sf Storage= 3,120 cf
Plug-Flow detention time= 645.9 min calculated for 0.038 af (100% of inflow)
Center-of-Mass det. time= 646.0 min ( 1,495.6 - 849.7 )
Volume Invert Avail.Storage Storage Description
#1 598.00' 3,120 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
598.00 340 0 0
599.00 1,700 1,020 1,020
600.00 2,500 2,100 3,120
Device Routing Invert Outlet Devices
#1 Primary 598.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 15.87 hrs HW=598.98' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.00 cfs of 5.10 cfs potential flow)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 212 of 359
Page 213
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 16
Pond BIO-1: Filtration Bioretention
Hydrograph
0.72 cfs Inflow
Outflow
Inflow Area=0.634 ac Primary
Secondary
Tertiary
0.8
0.75
Peak Elev=598.98'
0.7 Storage=994 cf
0.65
0.6
0.55
0.5
Flow (cfs)
0.45
0.4
0.35
0.3
0.25
0.2 0.02 cfs
0.15 0.02 cfs
0.1 0.00 cfs
0.00 cfs
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 213 of 359
Page 214
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 17
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 0.72" for 1-yr event
Inflow = 0.74 cfs @ 12.04 hrs, Volume= 0.039 af
Outflow = 0.02 cfs @ 15.70 hrs, Volume= 0.039 af, Atten= 97%, Lag= 219.6 min
Primary = 0.02 cfs @ 15.70 hrs, Volume= 0.039 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.95' @ 15.70 hrs Surf.Area= 1,776 sf Storage= 1,010 cf
Flood Elev= 598.00' Surf.Area= 2,630 sf Storage= 3,339 cf
Plug-Flow detention time= 621.3 min calculated for 0.039 af (100% of inflow)
Center-of-Mass det. time= 621.4 min ( 1,471.1 - 849.7 )
Volume Invert Avail.Storage Storage Description
#1 596.00' 3,339 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
596.00 348 0 0
597.00 1,850 1,099 1,099
598.00 2,630 2,240 3,339
Device Routing Invert Outlet Devices
#1 Primary 596.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 15.70 hrs HW=596.95' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.00 cfs of 4.75 cfs potential flow)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 214 of 359
Page 215
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 18
Pond BIO-2: Filtration Bioretention
Hydrograph
0.74 cfs Inflow
Outflow
Inflow Area=0.649 ac Primary
Secondary
Tertiary
0.8 Peak Elev=596.95'
0.75
0.7 Storage=1,010 cf
0.65
0.6
0.55
0.5
Flow (cfs)
0.45
0.4
0.35
0.3
0.25
0.2 0.02 cfs
0.15 0.02 cfs
0.1 0.00 cfs
0.00 cfs
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 215 of 359
Page 216
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 19
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.677 ac, 70.98% Impervious, Inflow Depth = 1.15" for 1-yr event
Inflow = 1.28 cfs @ 12.04 hrs, Volume= 0.065 af
Outflow = 0.04 cfs @ 14.68 hrs, Volume= 0.065 af, Atten= 97%, Lag= 158.5 min
Primary = 0.04 cfs @ 14.68 hrs, Volume= 0.065 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 595.92' @ 14.68 hrs Surf.Area= 3,049 sf Storage= 1,729 cf
Flood Elev= 597.00' Surf.Area= 3,978 sf Storage= 5,592 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 587.3 min ( 1,401.4 - 814.2 )
Volume Invert Avail.Storage Storage Description
#1 595.00' 5,592 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
595.00 705 0 0
596.00 3,250 1,978 1,978
597.00 3,978 3,614 5,592
Device Routing Invert Outlet Devices
#1 Primary 595.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.04 cfs @ 14.68 hrs HW=595.92' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.00 cfs of 5.10 cfs potential flow)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 216 of 359
Page 217
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 20
Pond BIO-3: Filtration Bioretention
Hydrograph
1.28 cfs Inflow
Outflow
Inflow Area=0.677 ac Primary
Secondary
Tertiary
Peak Elev=595.92'
Storage=1,729 cf
1
Flow (cfs)
0.04 cfs
0.04 cfs
0.00 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 217 of 359
Page 218
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 21
Summary for Pond CH-1: Chambers
Inflow Area = 2.091 ac, 90.96% Impervious, Inflow Depth = 1.44" for 1-yr event
Inflow = 4.80 cfs @ 12.04 hrs, Volume= 0.251 af
Outflow = 1.18 cfs @ 12.29 hrs, Volume= 0.251 af, Atten= 75%, Lag= 15.4 min
Primary = 1.18 cfs @ 12.29 hrs, Volume= 0.251 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 592.38' @ 12.29 hrs Surf.Area= 0.127 ac Storage= 0.079 af
Flood Elev= 598.32' Surf.Area= 0.127 ac Storage= 0.433 af
Plug-Flow detention time= 60.5 min calculated for 0.251 af (100% of inflow)
Center-of-Mass det. time= 60.2 min ( 847.2 - 787.0 )
Volume Invert Avail.Storage Storage Description
#1A 591.25' 0.177 af 37.08'W x 149.10'L x 5.50'H Field A
0.698 af Overall - 0.256 af Embedded = 0.442 af x 40.0% Voids
#2A 592.00' 0.256 af ADS_StormTech MC-3500 d +Cap x 100 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
100 Chambers in 5 Rows
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
0.433 af Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
#1 Primary 591.25' 8.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.25' / 591.00' S= 0.0100 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=1.18 cfs @ 12.29 hrs HW=592.38' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 1.18 cfs @ 3.38 fps)
Page 218 of 359
Page 219
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 22
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
5 Rows x 77.0" Wide + 9.0" Spacing x 4 + 12.0" Side Stone x 2 = 37.08' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
100 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 5 Rows = 11,144.2 cf Chamber Storage
30,410.2 cf Field - 11,144.2 cf Chambers = 19,266.0 cf Stone x 40.0% Voids = 7,706.4 cf Stone Storage
Chamber Storage + Stone Storage = 18,850.6 cf = 0.433 af
Overall Storage Efficiency = 62.0%
Overall System Size = 149.10' x 37.08' x 5.50'
100 Chambers
1,126.3 cy Field
713.6 cy Stone
Page 219 of 359
Page 220
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 23
Pond CH-1: Chambers
Hydrograph
Inflow
4.80 cfs Primary
5
Inflow Area=2.091 ac
Peak Elev=592.38'
4
Storage=0.079 af
8.0"
Flow (cfs)
3
Round Culvert
n=0.013
2
L=25.0'
1.18 cfs
S=0.0100 '/'
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 220 of 359
Page 221
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 24
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=27,596 sf 33.98% Impervious Runoff Depth=1.78"
Tc=6.0 min CN=86 Runoff=1.71 cfs 0.094 af
Subcatchment PS-2: Runoff Area=72,316 sf 88.61% Impervious Runoff Depth=2.69"
Tc=6.0 min CN=96 Runoff=6.39 cfs 0.372 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=1.78"
Tc=6.0 min CN=86 Runoff=1.75 cfs 0.096 af
Subcatchment PS-4: Runoff Area=29,485 sf 70.98% Impervious Runoff Depth=2.39"
Tc=6.0 min CN=93 Runoff=2.39 cfs 0.135 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=2.91"
Tc=6.0 min CN=98 Runoff=1.72 cfs 0.104 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=2.91"
Tc=6.0 min CN=98 Runoff=0.61 cfs 0.037 af
Subcatchment PS-7: Runoff Area=245,856 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=391' Tc=14.0 min CN=80 Runoff=8.08 cfs 0.638 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=1.32 cfs 0.139 af
Reach DP-1: Design Point Inflow=13.96 cfs 1.615 af
Outflow=13.96 cfs 1.615 af
Pond BIO-1: Filtration Bioretention Peak Elev=599.12' Storage=1,232 cf Inflow=1.71 cfs 0.094 af
Primary=0.02 cfs 0.045 af Secondary=1.10 cfs 0.049 af Tertiary=0.00 cfs 0.000 af Outflow=1.12 cfs 0.094 af
Pond BIO-2: Filtration Bioretention Peak Elev=597.12' Storage=1,319 cf Inflow=1.75 cfs 0.096 af
Primary=0.02 cfs 0.048 af Secondary=1.04 cfs 0.048 af Tertiary=0.00 cfs 0.000 af Outflow=1.06 cfs 0.096 af
Pond BIO-3: Filtration Bioretention Peak Elev=596.12' Storage=2,359 cf Inflow=2.39 cfs 0.135 af
Primary=0.04 cfs 0.084 af Secondary=1.03 cfs 0.050 af Tertiary=0.00 cfs 0.000 af Outflow=1.07 cfs 0.135 af
Pond CH-1: Chambers Peak Elev=593.15' Storage=0.161 af Inflow=8.11 cfs 0.476 af
8.0" Round Culvert n=0.013 L=25.0' S=0.0100 '/' Outflow=1.66 cfs 0.476 af
Total Runoff Area = 11.074 ac Runoff Volume = 1.615 af Average Runoff Depth = 1.75"
73.21% Pervious = 8.107 ac 26.79% Impervious = 2.967 ac
Page 221 of 359
Page 222
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 25
Summary for Subcatchment PS-1:
Runoff = 1.71 cfs @ 12.04 hrs, Volume= 0.094 af, Depth= 1.78"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
9,376 98 Paved parking, HSG D
18,220 80 >75% Grass cover, Good, HSG D
27,596 86 Weighted Average
18,220 66.02% Pervious Area
9,376 33.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
Runoff
1.71 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=27,596 sf
Runoff Volume=0.094 af
Runoff Depth=1.78"
Flow (cfs)
1
Tc=6.0 min
CN=86
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 222 of 359
Page 223
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 26
Summary for Subcatchment PS-2:
Runoff = 6.39 cfs @ 12.04 hrs, Volume= 0.372 af, Depth= 2.69"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
64,081 98 Paved parking, HSG D
8,235 80 >75% Grass cover, Good, HSG D
72,316 96 Weighted Average
8,235 11.39% Pervious Area
64,081 88.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
7 Runoff
6.39 cfs
NY-West Seneca 24-hr S1 10-yr
6
Rainfall=3.14"
Runoff Area=72,316 sf
5
Runoff Volume=0.372 af
Runoff Depth=2.69"
Flow (cfs)
4
Tc=6.0 min
CN=96
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 223 of 359
Page 224
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 27
Summary for Subcatchment PS-3:
Runoff = 1.75 cfs @ 12.04 hrs, Volume= 0.096 af, Depth= 1.78"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
Runoff
1.75 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=28,267 sf
Runoff Volume=0.096 af
Runoff Depth=1.78"
Flow (cfs)
Tc=6.0 min
1
CN=86
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 224 of 359
Page 225
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 28
Summary for Subcatchment PS-4:
Runoff = 2.39 cfs @ 12.04 hrs, Volume= 0.135 af, Depth= 2.39"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
8,557 80 >75% Grass cover, Good, HSG D
29,485 93 Weighted Average
8,557 29.02% Pervious Area
20,928 70.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
2.39 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
2 Runoff Area=29,485 sf
Runoff Volume=0.135 af
Runoff Depth=2.39"
Flow (cfs)
Tc=6.0 min
CN=93
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 225 of 359
Page 226
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 29
Summary for Subcatchment PS-5:
Runoff = 1.72 cfs @ 12.04 hrs, Volume= 0.104 af, Depth= 2.91"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
1.72 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=18,756 sf
Runoff Volume=0.104 af
Runoff Depth=2.91"
Flow (cfs)
1
Tc=6.0 min
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 226 of 359
Page 227
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 30
Summary for Subcatchment PS-6:
Runoff = 0.61 cfs @ 12.04 hrs, Volume= 0.037 af, Depth= 2.91"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
0.65 0.61 cfs
0.6 NY-West Seneca 24-hr S1 10-yr
0.55 Rainfall=3.14"
0.5 Runoff Area=6,622 sf
0.45 Runoff Volume=0.037 af
0.4
Runoff Depth=2.91"
Flow (cfs)
Tc=6.0 min
0.35
CN=98
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 227 of 359
Page 228
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 31
Summary for Subcatchment PS-7:
Runoff = 8.08 cfs @ 12.15 hrs, Volume= 0.638 af, Depth= 1.36"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
245,856 80 >75% Grass cover, Good, HSG D
245,856 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
9 Runoff
8.08 cfs
8 NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
7
Runoff Area=245,856 sf
6 Runoff Volume=0.638 af
Runoff Depth=1.36"
Flow (cfs)
5 Flow Length=391'
Tc=14.0 min
4
CN=80
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 228 of 359
Page 229
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 32
Summary for Subcatchment PS-8:
Runoff = 1.32 cfs @ 12.32 hrs, Volume= 0.139 af, Depth= 1.36"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
Runoff
1.32 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=53,474 sf
1 Runoff Volume=0.139 af
Runoff Depth=1.36"
Flow (cfs)
Flow Length=821'
Slope=0.0100 '/'
Tc=25.7 min
CN=80
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 229 of 359
Page 230
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 33
Summary for Reach DP-1: Design Point
Inflow Area = 11.074 ac, 26.79% Impervious, Inflow Depth = 1.75" for 10-yr event
Inflow = 13.96 cfs @ 12.15 hrs, Volume= 1.615 af
Outflow = 13.96 cfs @ 12.15 hrs, Volume= 1.615 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
13.96 cfs Outflow
15 13.96 cfs
14 Inflow Area=11.074 ac
13
12
11
10
9
Flow (cfs)
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 230 of 359
Page 231
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 34
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.634 ac, 33.98% Impervious, Inflow Depth = 1.78" for 10-yr event
Inflow = 1.71 cfs @ 12.04 hrs, Volume= 0.094 af
Outflow = 1.12 cfs @ 12.12 hrs, Volume= 0.094 af, Atten= 34%, Lag= 4.6 min
Primary = 0.02 cfs @ 12.12 hrs, Volume= 0.045 af
Routed to Reach DP-1 : Design Point
Secondary = 1.10 cfs @ 12.12 hrs, Volume= 0.049 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 599.12' @ 12.12 hrs Surf.Area= 1,797 sf Storage= 1,232 cf
Flood Elev= 600.00' Surf.Area= 2,500 sf Storage= 3,120 cf
Plug-Flow detention time= 326.2 min calculated for 0.094 af (100% of inflow)
Center-of-Mass det. time= 326.4 min ( 1,148.5 - 822.1 )
Volume Invert Avail.Storage Storage Description
#1 598.00' 3,120 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
598.00 340 0 0
599.00 1,700 1,020 1,020
600.00 2,500 2,100 3,120
Device Routing Invert Outlet Devices
#1 Primary 598.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.12 hrs HW=599.12' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=1.10 cfs @ 12.12 hrs HW=599.12' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 1.10 cfs of 6.00 cfs potential flow)
2=Overflow Grate (Weir Controls 1.10 cfs @ 1.14 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 231 of 359
Page 232
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 35
Pond BIO-1: Filtration Bioretention
Hydrograph
1.71 cfs Inflow
Outflow
Inflow Area=0.634 ac Primary
Secondary
Tertiary
Peak Elev=599.12'
Storage=1,232 cf
1.12 cfs
1.10 cfs
Flow (cfs)
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 232 of 359
Page 233
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 36
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 1.78" for 10-yr event
Inflow = 1.75 cfs @ 12.04 hrs, Volume= 0.096 af
Outflow = 1.06 cfs @ 12.13 hrs, Volume= 0.096 af, Atten= 39%, Lag= 5.6 min
Primary = 0.02 cfs @ 12.13 hrs, Volume= 0.048 af
Routed to Reach DP-1 : Design Point
Secondary = 1.04 cfs @ 12.13 hrs, Volume= 0.048 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 597.12' @ 12.13 hrs Surf.Area= 1,941 sf Storage= 1,319 cf
Flood Elev= 598.00' Surf.Area= 2,630 sf Storage= 3,339 cf
Plug-Flow detention time= 339.7 min calculated for 0.096 af (100% of inflow)
Center-of-Mass det. time= 339.9 min ( 1,162.0 - 822.1 )
Volume Invert Avail.Storage Storage Description
#1 596.00' 3,339 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
596.00 348 0 0
597.00 1,850 1,099 1,099
598.00 2,630 2,240 3,339
Device Routing Invert Outlet Devices
#1 Primary 596.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.13 hrs HW=597.12' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=1.04 cfs @ 12.13 hrs HW=597.12' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 1.04 cfs of 5.54 cfs potential flow)
2=Overflow Grate (Weir Controls 1.04 cfs @ 1.11 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 233 of 359
Page 234
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 37
Pond BIO-2: Filtration Bioretention
Hydrograph
1.75 cfs Inflow
Outflow
Inflow Area=0.649 ac Primary
Secondary
Tertiary
Peak Elev=597.12'
Storage=1,319 cf
1.06 cfs
1.04 cfs
Flow (cfs)
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 234 of 359
Page 235
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 38
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.677 ac, 70.98% Impervious, Inflow Depth = 2.39" for 10-yr event
Inflow = 2.39 cfs @ 12.04 hrs, Volume= 0.135 af
Outflow = 1.07 cfs @ 12.18 hrs, Volume= 0.135 af, Atten= 55%, Lag= 8.6 min
Primary = 0.04 cfs @ 12.18 hrs, Volume= 0.084 af
Routed to Reach DP-1 : Design Point
Secondary = 1.03 cfs @ 12.18 hrs, Volume= 0.050 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.12' @ 12.18 hrs Surf.Area= 3,334 sf Storage= 2,359 cf
Flood Elev= 597.00' Surf.Area= 3,978 sf Storage= 5,592 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 411.1 min ( 1,203.9 - 792.8 )
Volume Invert Avail.Storage Storage Description
#1 595.00' 5,592 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
595.00 705 0 0
596.00 3,250 1,978 1,978
597.00 3,978 3,614 5,592
Device Routing Invert Outlet Devices
#1 Primary 595.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.04 cfs @ 12.18 hrs HW=596.12' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=1.03 cfs @ 12.18 hrs HW=596.12' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 1.03 cfs of 6.00 cfs potential flow)
2=Overflow Grate (Weir Controls 1.03 cfs @ 1.11 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 235 of 359
Page 236
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 39
Pond BIO-3: Filtration Bioretention
Hydrograph
2.39 cfs Inflow
Outflow
Inflow Area=0.677 ac Primary
Secondary
Tertiary
Peak Elev=596.12'
Storage=2,359 cf
2
1.07 cfs
Flow (cfs)
1.03 cfs
1
0.04 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 236 of 359
Page 237
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 40
Summary for Pond CH-1: Chambers
Inflow Area = 2.091 ac, 90.96% Impervious, Inflow Depth = 2.73" for 10-yr event
Inflow = 8.11 cfs @ 12.04 hrs, Volume= 0.476 af
Outflow = 1.66 cfs @ 12.48 hrs, Volume= 0.476 af, Atten= 80%, Lag= 26.9 min
Primary = 1.66 cfs @ 12.48 hrs, Volume= 0.476 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 593.15' @ 12.48 hrs Surf.Area= 0.127 ac Storage= 0.161 af
Flood Elev= 598.32' Surf.Area= 0.127 ac Storage= 0.433 af
Plug-Flow detention time= 60.0 min calculated for 0.476 af (100% of inflow)
Center-of-Mass det. time= 59.7 min ( 829.9 - 770.2 )
Volume Invert Avail.Storage Storage Description
#1A 591.25' 0.177 af 37.08'W x 149.10'L x 5.50'H Field A
0.698 af Overall - 0.256 af Embedded = 0.442 af x 40.0% Voids
#2A 592.00' 0.256 af ADS_StormTech MC-3500 d +Cap x 100 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
100 Chambers in 5 Rows
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
0.433 af Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
#1 Primary 591.25' 8.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.25' / 591.00' S= 0.0100 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=1.66 cfs @ 12.48 hrs HW=593.15' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 1.66 cfs @ 4.75 fps)
Page 237 of 359
Page 238
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 41
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
5 Rows x 77.0" Wide + 9.0" Spacing x 4 + 12.0" Side Stone x 2 = 37.08' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
100 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 5 Rows = 11,144.2 cf Chamber Storage
30,410.2 cf Field - 11,144.2 cf Chambers = 19,266.0 cf Stone x 40.0% Voids = 7,706.4 cf Stone Storage
Chamber Storage + Stone Storage = 18,850.6 cf = 0.433 af
Overall Storage Efficiency = 62.0%
Overall System Size = 149.10' x 37.08' x 5.50'
100 Chambers
1,126.3 cy Field
713.6 cy Stone
Page 238 of 359
Page 239
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 42
Pond CH-1: Chambers
Hydrograph
Inflow
9 8.11 cfs Primary
8
Inflow Area=2.091 ac
Peak Elev=593.15'
7
Storage=0.161 af
6
8.0"
Flow (cfs)
5
Round Culvert
4 n=0.013
3 L=25.0'
2
1.66 cfs S=0.0100 '/'
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 239 of 359
Page 240
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 43
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=27,596 sf 33.98% Impervious Runoff Depth=3.67"
Tc=6.0 min CN=86 Runoff=3.44 cfs 0.194 af
Subcatchment PS-2: Runoff Area=72,316 sf 88.61% Impervious Runoff Depth=4.75"
Tc=6.0 min CN=96 Runoff=10.80 cfs 0.657 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=3.67"
Tc=6.0 min CN=86 Runoff=3.52 cfs 0.199 af
Subcatchment PS-4: Runoff Area=29,485 sf 70.98% Impervious Runoff Depth=4.41"
Tc=6.0 min CN=93 Runoff=4.23 cfs 0.249 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=4.98"
Tc=6.0 min CN=98 Runoff=2.85 cfs 0.179 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=4.98"
Tc=6.0 min CN=98 Runoff=1.01 cfs 0.063 af
Subcatchment PS-7: Runoff Area=245,856 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=391' Tc=14.0 min CN=80 Runoff=18.94 cfs 1.451 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=3.15 cfs 0.316 af
Reach DP-1: Design Point Inflow=31.66 cfs 3.307 af
Outflow=31.66 cfs 3.307 af
Pond BIO-1: Filtration Bioretention Peak Elev=599.25' Storage=1,462 cf Inflow=3.44 cfs 0.194 af
Primary=0.02 cfs 0.048 af Secondary=3.18 cfs 0.146 af Tertiary=0.00 cfs 0.000 af Outflow=3.21 cfs 0.194 af
Pond BIO-2: Filtration Bioretention Peak Elev=597.25' Storage=1,582 cf Inflow=3.52 cfs 0.199 af
Primary=0.02 cfs 0.052 af Secondary=3.23 cfs 0.147 af Tertiary=0.00 cfs 0.000 af Outflow=3.26 cfs 0.199 af
Pond BIO-3: Filtration Bioretention Peak Elev=596.27' Storage=2,865 cf Inflow=4.23 cfs 0.249 af
Primary=0.04 cfs 0.094 af Secondary=3.57 cfs 0.155 af Tertiary=0.00 cfs 0.000 af Outflow=3.61 cfs 0.249 af
Pond CH-1: Chambers Peak Elev=594.85' Storage=0.322 af Inflow=13.65 cfs 0.836 af
8.0" Round Culvert n=0.013 L=25.0' S=0.0100 '/' Outflow=2.40 cfs 0.836 af
Total Runoff Area = 11.074 ac Runoff Volume = 3.308 af Average Runoff Depth = 3.58"
73.21% Pervious = 8.107 ac 26.79% Impervious = 2.967 ac
Page 240 of 359
Page 241
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 44
Summary for Subcatchment PS-1:
Runoff = 3.44 cfs @ 12.04 hrs, Volume= 0.194 af, Depth= 3.67"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
9,376 98 Paved parking, HSG D
18,220 80 >75% Grass cover, Good, HSG D
27,596 86 Weighted Average
18,220 66.02% Pervious Area
9,376 33.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
Runoff
3.44 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
3
Runoff Area=27,596 sf
Runoff Volume=0.194 af
Runoff Depth=3.67"
Tc=6.0 min
Flow (cfs)
2
CN=86
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 241 of 359
Page 242
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 45
Summary for Subcatchment PS-2:
Runoff = 10.80 cfs @ 12.04 hrs, Volume= 0.657 af, Depth= 4.75"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
64,081 98 Paved parking, HSG D
8,235 80 >75% Grass cover, Good, HSG D
72,316 96 Weighted Average
8,235 11.39% Pervious Area
64,081 88.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
12 Runoff
10.80 cfs
11
NY-West Seneca 24-hr S1 100-yr
10 Rainfall=5.22"
9 Runoff Area=72,316 sf
Runoff Volume=0.657 af
8
Runoff Depth=4.75"
7
Tc=6.0 min
Flow (cfs)
6 CN=96
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 242 of 359
Page 243
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 46
Summary for Subcatchment PS-3:
Runoff = 3.52 cfs @ 12.04 hrs, Volume= 0.199 af, Depth= 3.67"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
Runoff
3.52 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
3 Runoff Area=28,267 sf
Runoff Volume=0.199 af
Runoff Depth=3.67"
Tc=6.0 min
Flow (cfs)
2 CN=86
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 243 of 359
Page 244
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 47
Summary for Subcatchment PS-4:
Runoff = 4.23 cfs @ 12.04 hrs, Volume= 0.249 af, Depth= 4.41"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
8,557 80 >75% Grass cover, Good, HSG D
29,485 93 Weighted Average
8,557 29.02% Pervious Area
20,928 70.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
4.23 cfs
NY-West Seneca 24-hr S1 100-yr
4
Rainfall=5.22"
Runoff Area=29,485 sf
Runoff Volume=0.249 af
3 Runoff Depth=4.41"
Tc=6.0 min
Flow (cfs)
CN=93
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 244 of 359
Page 245
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 48
Summary for Subcatchment PS-5:
Runoff = 2.85 cfs @ 12.04 hrs, Volume= 0.179 af, Depth= 4.98"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
3 2.85 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
Runoff Area=18,756 sf
Runoff Volume=0.179 af
2 Runoff Depth=4.98"
Tc=6.0 min
Flow (cfs)
CN=98
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 245 of 359
Page 246
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 49
Summary for Subcatchment PS-6:
Runoff = 1.01 cfs @ 12.04 hrs, Volume= 0.063 af, Depth= 4.98"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
1.01 cfs
1 NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
Runoff Area=6,622 sf
Runoff Volume=0.063 af
Runoff Depth=4.98"
Tc=6.0 min
Flow (cfs)
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 246 of 359
Page 247
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 50
Summary for Subcatchment PS-7:
Runoff = 18.94 cfs @ 12.15 hrs, Volume= 1.451 af, Depth= 3.09"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
245,856 80 >75% Grass cover, Good, HSG D
245,856 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
21 Runoff
20 18.94 cfs
19 NY-West Seneca 24-hr S1 100-yr
18
17
Rainfall=5.22"
16 Runoff Area=245,856 sf
15
Runoff Volume=1.451 af
14
13 Runoff Depth=3.09"
Flow Length=391'
Flow (cfs)
12
11
10
Tc=14.0 min
9 CN=80
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 247 of 359
Page 248
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 51
Summary for Subcatchment PS-8:
Runoff = 3.15 cfs @ 12.31 hrs, Volume= 0.316 af, Depth= 3.09"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
Runoff
3.15 cfs
NY-West Seneca 24-hr S1 100-yr
3
Rainfall=5.22"
Runoff Area=53,474 sf
Runoff Volume=0.316 af
Runoff Depth=3.09"
Flow Length=821'
Flow (cfs)
2
Slope=0.0100 '/'
Tc=25.7 min
CN=80
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 248 of 359
Page 249
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 52
Summary for Reach DP-1: Design Point
Inflow Area = 11.074 ac, 26.79% Impervious, Inflow Depth = 3.58" for 100-yr event
Inflow = 31.66 cfs @ 12.12 hrs, Volume= 3.307 af
Outflow = 31.66 cfs @ 12.12 hrs, Volume= 3.307 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
31.66 cfs Outflow
34 31.66 cfs
32 Inflow Area=11.074 ac
30
28
26
24
22
Flow (cfs)
20
18
16
14
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 249 of 359
Page 250
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 53
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.634 ac, 33.98% Impervious, Inflow Depth = 3.67" for 100-yr event
Inflow = 3.44 cfs @ 12.04 hrs, Volume= 0.194 af
Outflow = 3.21 cfs @ 12.06 hrs, Volume= 0.194 af, Atten= 7%, Lag= 1.5 min
Primary = 0.02 cfs @ 12.06 hrs, Volume= 0.048 af
Routed to Reach DP-1 : Design Point
Secondary = 3.18 cfs @ 12.06 hrs, Volume= 0.146 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 599.25' @ 12.06 hrs Surf.Area= 1,896 sf Storage= 1,462 cf
Flood Elev= 600.00' Surf.Area= 2,500 sf Storage= 3,120 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 168.5 min ( 967.4 - 798.9 )
Volume Invert Avail.Storage Storage Description
#1 598.00' 3,120 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
598.00 340 0 0
599.00 1,700 1,020 1,020
600.00 2,500 2,100 3,120
Device Routing Invert Outlet Devices
#1 Primary 598.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.06 hrs HW=599.25' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=3.18 cfs @ 12.06 hrs HW=599.25' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 3.18 cfs of 6.09 cfs potential flow)
2=Overflow Grate (Weir Controls 3.18 cfs @ 1.62 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 250 of 359
Page 251
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 54
Pond BIO-1: Filtration Bioretention
Hydrograph
3.44 cfs Inflow
Outflow
3.21 cfs Inflow Area=0.634 ac Primary
Secondary
Tertiary
3.18 cfs Peak Elev=599.25'
Storage=1,462 cf
3
Flow (cfs)
2
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 251 of 359
Page 252
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 55
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 3.67" for 100-yr event
Inflow = 3.52 cfs @ 12.04 hrs, Volume= 0.199 af
Outflow = 3.26 cfs @ 12.06 hrs, Volume= 0.199 af, Atten= 8%, Lag= 1.6 min
Primary = 0.02 cfs @ 12.06 hrs, Volume= 0.052 af
Routed to Reach DP-1 : Design Point
Secondary = 3.23 cfs @ 12.06 hrs, Volume= 0.147 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 597.25' @ 12.06 hrs Surf.Area= 2,044 sf Storage= 1,582 cf
Flood Elev= 598.00' Surf.Area= 2,630 sf Storage= 3,339 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 176.3 min ( 975.2 - 798.9 )
Volume Invert Avail.Storage Storage Description
#1 596.00' 3,339 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
596.00 348 0 0
597.00 1,850 1,099 1,099
598.00 2,630 2,240 3,339
Device Routing Invert Outlet Devices
#1 Primary 596.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.06 hrs HW=597.25' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=3.22 cfs @ 12.06 hrs HW=597.25' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 3.22 cfs of 5.63 cfs potential flow)
2=Overflow Grate (Weir Controls 3.22 cfs @ 1.63 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 252 of 359
Page 253
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 56
Pond BIO-2: Filtration Bioretention
Hydrograph
3.52 cfs Inflow
Outflow
3.26 cfs Inflow Area=0.649 ac Primary
Secondary
Tertiary
3.23 cfs Peak Elev=597.25'
Storage=1,582 cf
3
Flow (cfs)
2
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 253 of 359
Page 254
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 57
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.677 ac, 70.98% Impervious, Inflow Depth = 4.41" for 100-yr event
Inflow = 4.23 cfs @ 12.04 hrs, Volume= 0.249 af
Outflow = 3.61 cfs @ 12.08 hrs, Volume= 0.249 af, Atten= 15%, Lag= 2.3 min
Primary = 0.04 cfs @ 12.08 hrs, Volume= 0.094 af
Routed to Reach DP-1 : Design Point
Secondary = 3.57 cfs @ 12.08 hrs, Volume= 0.155 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.27' @ 12.08 hrs Surf.Area= 3,443 sf Storage= 2,865 cf
Flood Elev= 597.00' Surf.Area= 3,978 sf Storage= 5,592 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 255.7 min ( 1,030.5 - 774.9 )
Volume Invert Avail.Storage Storage Description
#1 595.00' 5,592 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
595.00 705 0 0
596.00 3,250 1,978 1,978
597.00 3,978 3,614 5,592
Device Routing Invert Outlet Devices
#1 Primary 595.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.04 cfs @ 12.08 hrs HW=596.26' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=3.57 cfs @ 12.08 hrs HW=596.26' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 3.57 cfs of 6.11 cfs potential flow)
2=Overflow Grate (Weir Controls 3.57 cfs @ 1.68 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 254 of 359
Page 255
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 58
Pond BIO-3: Filtration Bioretention
Hydrograph
4.23 cfs Inflow
Outflow
Inflow Area=0.677 ac Primary
Secondary
Tertiary
3.61 cfs Peak Elev=596.27'
4
3.57 cfs Storage=2,865 cf
3
Flow (cfs)
2
1
0.04 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 255 of 359
Page 256
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 59
Summary for Pond CH-1: Chambers
Inflow Area = 2.091 ac, 90.96% Impervious, Inflow Depth = 4.80" for 100-yr event
Inflow = 13.65 cfs @ 12.04 hrs, Volume= 0.836 af
Outflow = 2.40 cfs @ 12.57 hrs, Volume= 0.836 af, Atten= 82%, Lag= 31.8 min
Primary = 2.40 cfs @ 12.57 hrs, Volume= 0.836 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 594.85' @ 12.57 hrs Surf.Area= 0.127 ac Storage= 0.322 af
Flood Elev= 598.32' Surf.Area= 0.127 ac Storage= 0.433 af
Plug-Flow detention time= 68.0 min calculated for 0.836 af (100% of inflow)
Center-of-Mass det. time= 68.1 min ( 825.0 - 757.0 )
Volume Invert Avail.Storage Storage Description
#1A 591.25' 0.177 af 37.08'W x 149.10'L x 5.50'H Field A
0.698 af Overall - 0.256 af Embedded = 0.442 af x 40.0% Voids
#2A 592.00' 0.256 af ADS_StormTech MC-3500 d +Cap x 100 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
100 Chambers in 5 Rows
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
0.433 af Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
#1 Primary 591.25' 8.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.25' / 591.00' S= 0.0100 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=2.40 cfs @ 12.57 hrs HW=594.85' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 2.40 cfs @ 6.87 fps)
Page 256 of 359
Page 257
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 60
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
5 Rows x 77.0" Wide + 9.0" Spacing x 4 + 12.0" Side Stone x 2 = 37.08' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
100 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 5 Rows = 11,144.2 cf Chamber Storage
30,410.2 cf Field - 11,144.2 cf Chambers = 19,266.0 cf Stone x 40.0% Voids = 7,706.4 cf Stone Storage
Chamber Storage + Stone Storage = 18,850.6 cf = 0.433 af
Overall Storage Efficiency = 62.0%
Overall System Size = 149.10' x 37.08' x 5.50'
100 Chambers
1,126.3 cy Field
713.6 cy Stone
Page 257 of 359
Page 258
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 61
Pond CH-1: Chambers
Hydrograph
Inflow
15
13.65 cfs Primary
14 Inflow Area=2.091 ac
13
12
Peak Elev=594.85'
11 Storage=0.322 af
10
9
8.0"
Flow (cfs)
8 Round Culvert
7
n=0.013
6
5 L=25.0'
4
2.40 cfs S=0.0100 '/'
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 258 of 359
Page 259
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 62
Events for Subcatchment PS-1:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.72 0.038 0.72
10-yr 3.14 1.71 0.094 1.78
100-yr 5.22 3.44 0.194 3.67
Page 259 of 359
Page 260
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 63
Events for Subcatchment PS-2:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 3.74 0.194 1.40
10-yr 3.14 6.39 0.372 2.69
100-yr 5.22 10.80 0.657 4.75
Page 260 of 359
Page 261
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 64
Events for Subcatchment PS-3:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.74 0.039 0.72
10-yr 3.14 1.75 0.096 1.78
100-yr 5.22 3.52 0.199 3.67
Page 261 of 359
Page 262
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 65
Events for Subcatchment PS-4:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 1.28 0.065 1.15
10-yr 3.14 2.39 0.135 2.39
100-yr 5.22 4.23 0.249 4.41
Page 262 of 359
Page 263
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 66
Events for Subcatchment PS-5:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 1.06 0.057 1.60
10-yr 3.14 1.72 0.104 2.91
100-yr 5.22 2.85 0.179 4.98
Page 263 of 359
Page 264
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 67
Events for Subcatchment PS-6:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.37 0.020 1.60
10-yr 3.14 0.61 0.037 2.91
100-yr 5.22 1.01 0.063 4.98
Page 264 of 359
Page 265
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 68
Events for Subcatchment PS-7:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 2.49 0.215 0.46
10-yr 3.14 8.08 0.638 1.36
100-yr 5.22 18.94 1.451 3.09
Page 265 of 359
Page 266
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 69
Events for Subcatchment PS-8:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.40 0.047 0.46
10-yr 3.14 1.32 0.139 1.36
100-yr 5.22 3.15 0.316 3.09
Page 266 of 359
Page 267
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 70
Events for Reach DP-1: Design Point
Event Inflow Outflow Elevation Storage
(cfs) (cfs) (feet) (cubic-feet)
1-yr 4.12 4.12 0.00 0
10-yr 13.96 13.96 0.00 0
100-yr 31.66 31.66 0.00 0
Page 267 of 359
Page 268
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 71
Events for Pond BIO-1: Filtration Bioretention
Event Inflow Outflow Primary Secondary Tertiary Elevation Storage
(cfs) (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet)
1-yr 0.72 0.02 0.02 0.00 0.00 598.98 994
10-yr 1.71 1.12 0.02 1.10 0.00 599.12 1,232
100-yr 3.44 3.21 0.02 3.18 0.00 599.25 1,462
Page 268 of 359
Page 269
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 72
Events for Pond BIO-2: Filtration Bioretention
Event Inflow Outflow Primary Secondary Tertiary Elevation Storage
(cfs) (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet)
1-yr 0.74 0.02 0.02 0.00 0.00 596.95 1,010
10-yr 1.75 1.06 0.02 1.04 0.00 597.12 1,319
100-yr 3.52 3.26 0.02 3.23 0.00 597.25 1,582
Page 269 of 359
Page 270
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 73
Events for Pond BIO-3: Filtration Bioretention
Event Inflow Outflow Primary Secondary Tertiary Elevation Storage
(cfs) (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet)
1-yr 1.28 0.04 0.04 0.00 0.00 595.92 1,729
10-yr 2.39 1.07 0.04 1.03 0.00 596.12 2,359
100-yr 4.23 3.61 0.04 3.57 0.00 596.27 2,865
Page 270 of 359
Page 271
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 74
Events for Pond CH-1: Chambers
Event Inflow Primary Elevation Storage
(cfs) (cfs) (feet) (acre-feet)
1-yr 4.80 1.18 592.38 0.079
10-yr 8.11 1.66 593.15 0.161
100-yr 13.65 2.40 594.85 0.322
Page 271 of 359
Page 272
Appendix f:
Swppp inspection report
(sample form)
Page 272 of 359
Page 273
Page 273 of 359
Page 274
Prepared by:
LaBella Associates
Choose an item.
Choose an item.
Choose an item.
SWPPP INSPECTION REPORT NUMBER XX
CLIENT NAME
PROJECT NAME
PROJECT ADDRESS, TOWN OF X, X COUNTY, NY
PERMIT NUMBER
Performed: 2/1/2025 @ 12:00 AM
Report Issued: 2/1/2025
Status: SATISFACTORY (All erosion control measures are installed and in
working order)
Qualified Inspector (name and title) Qualified Professional (name and title)
Click or tap to enter a date. Click or tap to enter a date.
Date Date
Signature Signature
Page 274 of 359
Page 275
Page 275 of 359
Page 276
NYSDEC Documentation and SWPPP Forms
The project has received a Letter of Authorization (LOA) from NYSDEC Choose an item.
The project has received a five acre waiver approved by NYSDEC or MS4 Choose an item.
The project currently has disturbance greater than five acres Choose an item.
The project directly discharges to a 303d waterbody/course Choose an item.
The project is within a phosphorus enhanced watershed Choose an item.
Number of inspections required per week Choose an item.
Included in Site Log Book
Preconstruction Assessment Choose an item.
Copy of Notice of Intent (NOI) Choose an item.
Letter of Authorization (LOA) Choose an item.
SWPPP Preparer Certification Form Choose an item.
Owner/Operator Certification Form Choose an item.
MS4 SWPPP Acceptance Form Choose an item.
NYCDEP SWPPP Acceptance/Approval Form Choose an item.
MS4 No Jurisdiction Form Choose an item.
Contractor and Subcontractor Certifications Choose an item.
SPDES General Permit Choose an item.
Five Acre Waiver Authorization Choose an item.
Notice of Termination (NOT) Choose an item.
Site Conditions
Total area (acres) with active soil disturbance (not requiring temporary or final stabilization)
Total area (acres) with inactive soil disturbance (requiring temporary or final stabilization)
Total area (acres) that has achieved temporary stabilization
Total area (acres) that has achieved final stabilization
Allowable disturbed area (acres) per NOI and/or five acre waiver
Provide a general description of construction activities ongoing during inspection:
Weather Conditions Choose an item.
Temperature at time of inspection XX degrees F
Soil conditions at time of inspection Choose an item.
Description of Discharge
Sediment Discharge
Point/Surface Waters of Condition of Runoff Corrective Action(s)
Noted
the State
Choose an item. Choose an item.
Choose an item. Choose an item.
Choose an item. Choose an item.
Choose an item. Choose an item.
Page 276 of 359
Page 277
Erosion and Sediment Control Deficiencies and Corrective Actions
In the following table, provide marks in the appropriate columns to indicate the conditions of all erosion and
sediment control practices at the site.
Erosion & Sediment Control Functioning as Needs Repair or Not Installed
Not Applicable
Practice Designed Maintenance Properly
Temporary Erosion & Sediment Control Practices
General Site Conditions ☐ ☐ ☐ ☐
Stabilized Construction Access ☐ ☐ ☐ ☐
Silt Fence ☐ ☐ ☐ ☐
Inlet Protection Measures ☐ ☐ ☐ ☐
Soil Stockpiles ☐ ☐ ☐ ☐
Dust Control Measures ☐ ☐ ☐ ☐
Pavement Sweeping ☐ ☐ ☐ ☐
Temporary Stabilization ☐ ☐ ☐ ☐
Dewatering Operations ☐ ☐ ☐ ☐
Slope Protection Measures ☐ ☐ ☐ ☐
Temporary Parking Areas ☐ ☐ ☐ ☐
Concrete Washout ☐ ☐ ☐ ☐
Temporary Swales and Berms ☐ ☐ ☐ ☐
Stone Check Dams ☐ ☐ ☐ ☐
Sediment Traps/Basins ☐ ☐ ☐ ☐
Compost Filter Sock ☐ ☐ ☐ ☐
Temporary Stream Crossing ☐ ☐ ☐ ☐
Fiber Roll ☐ ☐ ☐ ☐
Water Bars ☐ ☐ ☐ ☐
Flow Diffusers ☐ ☐ ☐ ☐
Other: ☐ ☐ ☐ ☐
Permanent Erosion & Sediment Control Practices
Rock Outlet Protection ☐ ☐ ☐ ☐
Permanent Turf Reinforcement ☐ ☐ ☐ ☐
Permanent Stabilization ☐ ☐ ☐ ☐
Other: ☐ ☐ ☐ ☐
Refer to the following page for deficiencies and corrective actions
Page 277 of 359
Page 278
Corrective Actions
For all erosion and sediment control practices identified in the above table as “needs repair or maintenance” or “not
installed properly,” provide detailed corrective actions that are required.
Date
Date
Deficiency Deficiency
ESC Practice ID Deficiency and Corrective Action Deficiency
First Corrected?
Corrected
Reported
Choose an item. Click or Choose an Click or tap
Choose an item. tap to
Click or item. an
Choose to enter
Click a
or tap
Choose an item. enter
tap to
Click a
or item. an
Choose date.
to enter
Click a
or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. date.
to enter a
date.a
enter date.
date.
Page 278 of 359
Page 279
Stormwater Management Practices
For all stormwater management practices proposed on the project, indicate the status of each practice at the time
of inspection, any deficiencies (if applicable) and corresponding corrective actions.
SMP
Sign Deficiency and Corrective Deficiency Corrected
Practice Status
Installed Action (if Applicable) Date Action Date
ID
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Page 279 of 359
Page 280
Deficiencies and Corrective Action Photo Log
Deficiency Photo 1 Corrective Action Photo 1
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 2 Corrective Action Photo 2
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 3 Corrective Action Photo 3
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Page 280 of 359
Page 281
Deficiencies and Corrective Action Photo Log (continued)
Deficiency Photo 4 Corrective Action Photo 4
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 5 Corrective Action Photo 5
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 6 Corrective Action Photo 6
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Page 281 of 359
Page 282
Disturbance / Photo Location Map
Replace this page to include an 11x17 erosion control plan sketch to scale showing:
1. Areas with active soil disturbance activity
2. Areas with inactive soil disturbance activity
3. Areas that have achieved temporary stabilization
4. Areas that have achieved final stabilization
5. Photo locations for deficiencies
6. Photo locations for corrective actions
7. Location of erosion and sediment control practices installed
Use Bluebeam template with standard colors to indicate limits
Page 282 of 359
Page 283
Page 283 of 359
Page 284
Appendix G:
Post-construction
inspections and maintenance
Page 284 of 359
Page 285
Page 285 of 359
Page 286
Bioretention Stormwater Management Practices
Level 1 Inspection Checklist
SMP ID # SMP Owner Private
Public
SMP Location
(Address; Latitude
& Longitude)
Latitude Longitude
Party Responsible for
System Type Type of Site
Maintenance
Same as SMP Owner Seasonal Above Ground Commercial
Other Continuous Use Below Ground Industrial
Other Residential
_________________________
State
Inspection Date Inspection Time
Inspector
Date of Last
Inspection
BR Drainage Area
Look for areas that are uphill from the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Seed and mulch areas of bare soil to establish
vegetation.
Bare soil, erosion Fill in erosion areas with soil, compact, and seed and
of the ground straw to establish vegetation.
(rills washing out If a rill or small channel is forming, try to redirect water
the dirt) flowing to this area by creating a small berm or adding
topsoil to areas that are heavily compacted.
Other:
Page 1 of 8
Page 286 of 359
Page 287
BR Drainage Area
Look for areas that are uphill from the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Kick-Out to Level 2 Inspection: Large areas of soil
have been eroded, or larger channels are forming.
May require rerouting of flow paths.
Piles of grass Remove or cover piles of grass clippings,
clippings, mulch, mulch, dirt, etc.
dirt, salt, or
other materials Other:
Cover or properly dispose of materials; consult your
Open containers local solid waste authority for guidance on materials
of oil, grease, that may be toxic or hazardous.
paint, or other
substances
Other:
Page 2 of 8
Page 287 of 359
Page 288
BR Inlets
Stand in the Bioretention cell itself and look for all the places where water flows in. Often there will be multiple points of inflow to the
practice.
Problem (Check if Present) Follow-Up Actions
Use a flat shovel to remove grit and debris (especially at curb inlets
or openings). Parking lots generate fine grit that will accumulate at
these spots.
Pull out clumps of growing grass or weeds and scoop out the soil or grit
that the plants are growing in.
Remove any grass clippings, leaves, sticks, and other debris that is
collecting at inlets.
For pipes and ditches, remove sediment and debris that is partially
blocking the pipe or ditch opening where it enters the Bioretention cell.
Dispose of all material properly where it will not re-enter the
Bioretention cell.
Other:
Inlets collect grit and debris or grass/weeds.
Some water may not be getting into the
Bioretention cell. The objective is to have a
clear pathway for water to flow into the cell.
Kick-Out to Level 2 Inspection: Inlets are blocked to the extent that most
of the water does not seem to be entering the Bioretention cell.
For small areas of erosion, smooth out the eroded part and apply rock or
stone (e.g., river cobble) to prevent further erosion. Usually, filter fabric is
placed under the rock or stone.
In some cases, reseeding and applying erosion-control matting can be
used to prevent further erosion. Some of these materials may be available
at a garden center, but it may be best to consult a landscape contractor.
Other:
Kick-Out to Level 2 Inspection: Erosion is occurring at most of the inlets,
Some or all of the inlets are eroding so that and it looks like there is too much water that is concentrating at these
rills, gullies, and other erosion is present, or points. The inlet design may have to be modified.
there is bare dirt that is washing into the
Bioretention cell.
Page 3 of 8
Page 288 of 359
Page 289
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Add new mulch to a total depth (including any existing mulch that is left) of 2
to 3 inches. The mulch should be shredded hardwood mulch that is less
likely to float away during rainstorms.
Avoid adding too much mulch so that inlets are obstructed or certain areas
become higher than the rest of the Bioretention surface.
Other:
Mulch (if used) needs to be replaced or
replenished. The mulch layer had
decomposed or is less than 1-inch thick.
Use a shovel to scoop out minor areas of sediment or grit, especially in the
spring after winter sanding materials may wash in and accumulate. Dispose
of the material where it cannot re-enter the Bioretention cell .
If removing the material creates a hole or low area, fill with soil mix that
matches original mix and cover with mulch so that the Bioretention surface
area is as flat as possible.
Remove trash, vegetative debris, and other undesirable materials.
Other:
Kick-Out to Level 2 Inspection: Sediment has accumulated more than 2-
inches deep and covers 25% or more of the Bioretention surface.
Kick-Out to Level 2 Inspection: The Bioretention cell is too
densely vegetated to assess sediment accumulation or ponding;
Minor areas of sediment, grit, trash, or other see BR-4, Vegetation.
debris are accumulating on the bottom.
Page 4 of 8
Page 289 of 359
Page 290
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Try filling the eroded areas with clean topsoil or sand, and cover with
mulch.
If the problem recurs, you may have to use stone (e.g., river cobble) to fill
in problem areas.
If the erosion is on a side slope, fill with clay that can be compacted and
seed and mulch the area.
Other:
There is erosion in the bottom or on the side
slopes. Water seems to be carving out rills as
it flows across the Bioretention surface or on
the slopes, or sinkholes are forming in certain Kick-Out to Level 2 Inspection: The problem persists or the erosion is more
areas. than 3-inches deep and seems to be an issue with how water enters and
Source: Stormwater Maintenance, LLC. moves through the Bioretention cell.
Kick-Out to Level 2 Inspection: The problem does not seem to be caused
by flowing water, but a collapse or sinking of the surface (e.g., “sinkhole”)
due to some underground problem.
If the problem is minor (just small, isolated areas are not covered with
water), try raking the surface OR adding mulch to low spots to create a
more level surface. You may need to remove and replace plantings in
order to properly even off the surface.
Check the surface with a string and bubble level to get the surface as flat
as possible.
Other:
Kick-Out to Level 2 Inspection: Ponding water is isolated to less than half
The bottom of the Bioretention cell is not flat,
of the Bioretention surface area, and there seem to be elevation
and the water pools at one end, along an
differences of more than a couple of inches across the surface.
edge, or in certain pockets. The whole bottom
is not uniformly covered with water. See
design plan to verify that bioretention surface
is intended to be flat. Check during or
immediately after a rainstorm.
Page 5 of 8
Page 290 of 359
Page 291
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Kick-Out to Level 2 Inspection: This is generally a serious problem, and it
will be necessary to activate a Level 2 Inspection.
Water stands on the surface more than 72
hours after a rainstorm and /or wetland-type
vegetation is present. The Bioretention cell
does not appear to be draining properly.
BR Vegetation
Examine all Bioretention cell vegetation.
Problem (Check if Present) Follow-Up Actions
If you can identify which plants are weeds or not intended to
be part of the planting plan, eliminate these, preferably by
hand pulling.
If weeds are widespread, check with the local stormwater
authority and/or Extension Office about proper use of
herbicides for areas connected with the flow of water.
Even vegetation that is intended to be present can become
large, overgrown, and/or crowd out surrounding plants. Prune
and thin accordingly.
If weeds or invasive plants have overtaken the whole
Bioretention cell , bush-hog the entire area before seedheads
form in the spring. It will be necessary to remove the root mat
manually or with appropriate herbicides, as noted above.
Re-plant with species that are aesthetically pleasing and
seem to be doing well in the Bioretention cell.
Other:
Kick-Out to Level 2 Inspection: You are unsure of the original
planting design, or the vegetation maintenance task is beyond
Vegetation requires regular maintenance—pulling
your capabilities of time, expertise, or resources. If you are
weeds, removing dead and diseased plants, replacing
unsure of the health of the vegetation (e.g. salt damage,
mulch around plants, adding plants to fill in areas that
invasives, which plants are undesirable) or the appropriate
are not well vegetated, etc.
season to conduct vegetation management, consult a
landscape professional before undertaking any cutting,
pruning, mowing, or brush hogging.
Page 6 of 8
Page 291 of 359
Page 292
BR Vegetation
Examine all Bioretention cell vegetation.
Problem (Check if Present) Follow-Up Actions
The original plants are likely not suited for the actual
conditions within the Bioretention cell . If you are
knowledgeable about plants, select and plant more
appropriate vegetation (preferably native plants) so that
almost the entire surface area will be covered by the end of
the second growing season.
Other:
Kick-Out to Level 2 Inspection: For all but small practices
(e.g., rain gardens), this task will likely require a landscape
design professional or horticulturalist.
Vegetation is too thin, is not healthy, and there are
many spots that are not well vegetated.
BR Outlets
Examine outlets that release water out of the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Add stone to reduce the impact from the water flowing out of the outlet pipe or
weir during storms.
Other:
Erosion at outlet
Kick-Out to Level 2 Inspection: Rills have formed and erosion problem
becomes more severe.
Remove the debris and dispose of it where it cannot re-enter the
Bioretention cell .
Other:
Kick-Out to Level 2 Inspection: Outlet is completely clogged or obstructed;
there is too much material to remove by hand or with simple hand tools.
Outlet obstructed with mulch, sediment,
debris, trash, etc.
Page 7 of 8
Page 292 of 359
Page 293
Additional Notes:
Inspector: Date:
Complete the following if follow-up/corrective actions were identified during this inspection:
Certified Completion of Follow-Up Actions:
“I hereby certify that the follow-up/corrective actions identified in the inspection
performed on _____________ (DATE) have been completed and any required
maintenance deficiencies have been adequately corrected.”
Inspector/Operator: Date:
Page 8 of 8
Page 293 of 359
Page 294
Bioretention Stormwater Management Practices
Level 2 Inspection Checklist
SMP ID # SMP Owner Private
Public
SMP Location
(Address; Latitude
& Longitude)
Latitude Longitude
Party Responsible for
System Type Type of Site
Maintenance
Same as SMP Owner Seasonal Above Ground Commercial
Other Continuous Use Below Ground Industrial
Other Residential
_________________________ State
Inspection Date Inspection Time
Inspector
Date of Last
Inspection
Page 1 of 4
Page 294 of 359
Page 295
Level 2 Inspection: BIORETENTION
NOTE: Key Source for this Information (CSN, 2013)
Recommended Repairs Triggers for Level 3 Inspection
Observed Condition: Water Stands on Surface for More than 72 Hours after Storm
Condition 1: Small pockets of standing water
Use a soil probe or auger to examine the soil profile. If isolated areas have
accumulated grit, fines, or vegetative debris or have bad soil media, try scraping
off top 3 inches of media and replacing with clean material. Also check to see
that surface is level and water is not ponding selectively in certain areas. Soil media is clogged and problem is not
evident from Level 2 inspection.
Level 2 inspection identifies problem, but it
Condition 2: Standing water is widespread or covers entire surface cannot be resolved easily or is associated
with the original design of the practice.
Requires diagnosis and resolution of problem:
Clogged underdrain?
Filter fabric between soil media and underdrain stone?
Need to install underdrain if not present? Level 3 inspection necessary
Too much sediment/grit washing in from drainage area?
Too much ponding depth?
Improper soil media?
Observed Condition: Vegetation is sparse or out of control
Condition 1: Original design planting plan seems good but has not been
maintained, so there are many invasives and/or dead plants
Vegetation deviates significantly from
Will require some horticultural experience to restore vegetation to intended original planting plan; Bioretention has
condition by weeding, pruning, removing plants, and adding new plants. been neglected and suffered from deferred
maintenance.
Owner/responsible party does not know
Condition 2: Original design planting plan is unknown or cannot be how to maintain the practice.
actualized
A landscape architect or horticulturalist will be needed to redo the planting plan.
Will likely require analysis of soil pH, moisture, organic content, sun/shade, and
other conditions to make sure plants match conditions. Plan should include Level 3 inspection necessary
invasive plant management and maintenance plan to include mulching,
watering, disease intervention, periodic thinning/pruning, etc.
Observed Condition: Bioretention does not conform to original design plan in surface area or storage
Condition 1: Level 2 Inspection reveals that practice is too small based More than a 25% departure from the
on design dimension, does not have adequate storage (e.g., ponding approved plan in surface area, storage, or
depth) based on the plan, and/or does not treat the drainage area runoff drainage area; sometimes less than this
as indicated on the plan threshold at the discretion of the Level 2
inspector.
Small areas of deviation can be corrected by the property owner or responsible
party, but it is likely that a Qualified Professional will have to revisit the design
and attempt a redesign that meets original objectives or that can be resubmitted
to the municipality for approval. Level 3 inspection necessary
Page 2 of 4
Page 295 of 359
Page 296
Level 2 Inspection: BIORETENTION
NOTE: Key Source for this Information (CSN, 2013)
Recommended Repairs Triggers for Level 3 Inspection
Observed Condition: Severe erosion of filter bed, inlets, or around outlets
Condition 1: Erosion at inlets
The lining (e.g., grass, matting, stone, rock) may not be adequate for the actual
flow velocities coming through the inlets. First line of defense is to try a more
non-erosive lining and/or to extend the lining further down to where inlet slopes
meet the Bioretention surface. If problem persists, analysis by a Qualified Erosion (rills, gullies) is more than 12
Professional is warranted. inches deep at inlets or the filter bed or
more than 3 inches deep on side slopes.
If the issue is not caused by moving water
Condition 2: Erosion of Bioretention filter bed but some sort of subsurface defect. This
may manifest as a sinkhole or linear
This is often caused by “preferential flow paths” through and along the depression and be associated with
Bioretention surface. The source of flow should be analyzed and methods problems with the underdrain stone or pipe
employed to dissipate energy and disperse the flow (e.g., check dams, rock or underlying soil.
splash pads).
Condition 3: Erosion on side slopes
Level 3 inspection necessary
Again, the issue is likely linked with unanticipated flow paths down the side
slopes (probably overland flow that concentrates as it hits the edge of the
slope). For small or isolated areas, try filling, compacting, and re-establishing
healthy ground cover vegetation. If the problem is more widespread, further
analysis is required to determine how to redirect the flow.
Observed Condition: Significant sediment accumulation, indicating an uncontrolled source of sediment
Condition 1: Isolated areas of sediment accumulation, generally less than
3-inches deep
More than 2 inches of accumulated
Sediment source may be from a one-time or isolated event. Remove sediment cover 25% or more of the
accumulated sediment and top 2 to 3 inches of Bioretention soil media; replace Bioretention surface area.
with clean material. Check drainage area for any ongoing sources of sediment.
“Hard pan” of thin, crusty layer covers
majority of Bioretention surface area and
seems to be impeding flow of water down
Condition 2: Majority of the surface is caked with “hard pan” (thin layer of through the soil media.
clogging material) or accumulated sediment that is 3-inches deep or
more New sources of sediment seem to be
accumulating with each significant rainfall
This can be caused by an improper construction sequence (drainage area not event.
fully stabilized prior to installation of Bioretention soil media) or another chronic
source of sediment in the drainage area. Augering several holes down through
the media can indicate how severe the problem is; often the damage is confined
to the first several inches of soil media. Removing and replacing this top layer Level 3 inspection necessary
(or to the depth where sediment incursion is seen in auger holes) can be
adequate, as long as the problem does not recur.
Page 3 of 4
Page 296 of 359
Page 297
Notes:
Inspector: Date:
Complete the following if follow-up/corrective actions were identified during this inspection:
Certified Completion of Follow-Up Actions:
“I hereby certify that the follow-up/corrective actions identified in the inspection
performed on _____________ (DATE) have been completed and any required
maintenance deficiencies have been adequately corrected.”
Inspector/Operator: Date:
Page 4 of 4
Page 297 of 359
Page 298
Appendix e:
Nysdec “deep-ripping and
decompaction,” April 2008
Page 298 of 359
Page 299
Page 299 of 359
Page 300
New York State
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Document Prepared by:
John E. Lacey,
Land Resource Consultant and Environmental Compliance Monitor
Division of Water (Formerly with the Division of Agricultural Protection and Development Services,
NYS Dept. of Agriculture & Markets)
Deep-Ripping and
Decompaction
April 2008
New York State
Department of Environmental Conservation
Page 300 of 359
Page 301
AlternativeȱStormwaterȱManagementȱ
DeepȬRippingȱandȱDecompactionȱ
ȱ ȱ ȱ ȱ ȱ ȱ ȱ ȱ ȱ Recommended Application of Practice
Description
Theȱobjective of Deep Ripping and
The two-phase practice of 1) “Deep Ripping;” and 2) “Decompaction” (deep subsoiling), of the Decompaction is to effectively fracture
soil material as a step in the cleanup and restoration/landscaping of a construction site, helps (vertically and laterallly) through the thickness
mitigate the physically induced impacts of soil compression; i.e.: soil compaction or the of the physically compressed subsoil material
substantial increase in the bulk density of the soil material. (see Figure 3), restoring soil porosity and
permeability and aiding infiltration to help
Deep Ripping and Decompaction are key factors which help in restoring soil pore space and reduce runoff. Together with topsoil stripping,
permeability for water infiltration. Conversely, the physical actions of cut-and-fill work, land the “two-phase” practice of Deep Ripping and
grading, the ongoing movement of construction equipment and the transport of building Decompaction first became established as a “best
materials throughout a site alter the architecture and structure of the soil, resulting in: the mixing management practice” through ongoing success
of layers (horizons) of soil materials, compression of those materials and diminished soil on commercial farmlands affected by heavy Fig. 3. Construction site with significant
porosity which, if left unchecked, severely impairs the soil’s water holding capacity and vertical utility construction right-of-way projects compaction of the deep basal till subsoil
drainage (rainfall infiltration), from the surface downward. (transmission pipelines and large power lines). extends 24 inches below this exposed cut-
and-fill work surface.
In a humid climate region, compaction damage on a site is virtually guaranteed over the duration Soil permeability, soil drainage and cropland
of a project. Soil in very moist to wet condition when compacted, will have severely reduced productivity were restored. For broader
permeability. Figure 1 displays the early stage of the deep-ripping phase (Note that all topsoil construction application, the two-phase practice of Deep Ripping and Decompaction is best
was stripped prior to construction access, and it remains stockpiled until the next phase – adapted to areas impacted with significant soil compaction, on contiguous open portions of large
decompaction – is complete). A heavy-duty tractor is pulling a three-shank ripper on the first of construction sites and inside long, open construction corridors used as temporary access over the
several series of incrementally deepening passes through the construction access corridor's duration of construction. Each mitigation area should have minimal above-and-below-ground
densely compressed subsoil material. Figure 2 illustrates the approximate volumetric obstructions for the easy avoidance and maneuvering of a large tractor and ripping/decompacting
composition of a loam surface soil when conditions are good for plant growth, with adequate implements. Conversely, the complete two-phase practice is not recommended in congested or
natural pore space for fluctuating moisture conditions. obstructed areas due to the limitations on tractor and implement movement.
Benefits
Aggressive “deep ripping” through the compressed thickness of exposed subsoil before the
replacement/respreading of the topsoil layer, followed by “decompaction,” i.e.: “sub-soiling,”
through the restored topsoil layer down into the subsoil, offers the following benefits:
x Increases the project (larger size) area’s direct surface infiltration of rainfall by
providing the open site’s mitigated soil condition and lowers the demand on
concentrated runoff control structures
Fig. 1. A typical deep ripping phase of this
practice, during the first in a series of Fig. 2. About 50% of the volume of undisturbed x Enhances direct groundwater recharge through greater dispersion across and through a
progressively deeper “rips” through severely loam surface soil is pore space, when soil is in broader surface than afforded by some runoff-control structural measures
compressed subsoil. good condition for plant growth. Brady, 2002.
x Decreases runoff volume generated and provides hydrologic source control
ȱ
x May be planned for application in feasible open locations either alone or in
1
2
Page 301 of 359
Page 302
conjunction with plans for structural practices (e.g., subsurface drain line or lawn/ground cover to help maintain the restored subsoil structure. Infiltration after construction-
infiltration basin) serving the same or contiguous areas induced mixing and compression of such subsoil material can be notably rehabilitated with the
Deep Ripping and Decompaction practice, which prepares the site for the appropriate long-term
x Promotes successful long-term revegetation by restoring soil permeability, drainage and lawn/ground cover mix including deep taproot plants such as clover, fescue or trefoil, etc. needed
water holding capacity for healthy (rather than restricted) root-system development of for all rehabilitated soils.
trees, shrubs and deep rooted ground cover, minimizing plant drowning during wet
periods and burnout during dry periods. Generally, soils in Hydrologic Soil Groups A and B, which respectively may include deep, well-
drained, sandy-gravelly materials or deep, moderately well-drained basal till materials, are among
Feasibility/Limitations the easier ones to restore permeability and infiltration, by deep ripping and decompaction. Among
the many different soils in Hydrologic Soil Group C are those unique glacial tills having a natural
The effectiveness of Deep Ripping and Decompaction is governed mostly by site factors such as: fragipan zone, beginning about 12 to 18 inches (30 – 45cm), below surface. Although soils in
the original (undisturbed) soil’s hydrologic characteristics; the general slope; local weather/timing Hydrologic Soil Group C do require a somewhat more carefully applied level of the Deep Ripping
(soil moisture) for implementation; the space-related freedom of equipment/implement and Decompaction practice, it can greatly benefit such affected areas by reducing the runoff and
maneuverability (noted above in Recommended Application of Practice), and by the proper fostering infiltration to a level equal to that of pre-disturbance.
selection and operation of tractor and implements (explained below in Design Guidance). The
more notable site-related factors include: Soils in Hydrologic Soil Group D typically have a permanent high water table close to the surface,
influenced by a clay or other highly impervious layer of material. In many locations with clay
Soil subsoil material, the bulk density is so naturally high that heavy trafficking has little or no added
In the undisturbed condition, each identified soil type comprising a site is grouped into one of impact on infiltration; and structural runoff control practices rather than Deep Ripping and
four categories of soil hydrology, Hydrologic Soil Group A, B, C or D, determined primarily by a Decompaction should be considered.
range of characteristics including soil texture, drainage capability when thoroughly wet, and depth
to water table. The natural rates of infiltration and transmission of soil-water through the The information about Hydrologic Soil Groups is merely a general guideline. Site-specific data
undisturbed soil layers for Group A is “high” with a low runoff potential while soils in Group B such as limited depths of cut-and-fill grading with minimal removal or translocation of the inherent
are moderate in infiltration and the transmission of soil-water with a moderate runoff potential, subsoil materials (as analyzed in the county soil survey) or, conversely, the excavation and
depending somewhat on slope. Soils in Group C have slow rates of infiltration and transmission translocation of deeper, unconsolidated substratum or consolidated bedrock materials (unlike the
of soil-water and a moderately high runoff potential influenced by soil texture and slope; while analyzed subsoil horizons’ materials referred to in the county soil survey) should always be taken
soils in Group D have exceptionally slow into account.
rates of infiltration and transmission of soil-
water, and high runoff potential. Sites made up with significant quantities of large rocks, or having a very shallow depth to bedrock,
are not conducive to deep ripping and decompation (subsoiling); and other measures may be more
In Figure 4, the profile displays the practical.
undisturbed horizons of a soil in Hydrologic
Soil Group C and the naturally slow rate of Slope
infiltration through the subsoil. The slow rate The two-phase application of 1) deep ripping and 2) decompaction (deep subsoiling), is most
of infiltration begins immediately below the practical on flat, gentle and moderate slopes. In some situations, such as but not limited to
topsoil horizon (30 cm), due to the limited temporary construction access corridors, inclusion areas that are moderately steep along a project’s
amount of macro pores, e.g.: natural subsoil otherwise gentle or moderate slope may also be deep ripped and decompacted. For limited
fractures, worm holes and root channels. instances of moderate steepness on other projects, however, the post-construction land use and the
Infiltration after the construction-induced relative alignment of the potential ripping and decompaction work in relation to the lay of the
mixing and compression of such subsoil slope should be reviewed for safety and practicality. In broad construction areas predominated by
material is virtually absent; but can be moderately steep or steep slopes, the practice is generally not used.
restored back to this natural level with the
Fig. 4. Profile (in centimeters) displaying the Local Weather/Timing/Soil Moisture
two-phase practice of deep ripping and
infiltration test result of the natural undisturbed Effective fracturing of compressed subsoil material from the exposed work surface, laterally and
decompaction, followed by the permanent
horizons of a soil in Hydrologic Soil Group C. vertically down through the affected zone is achieved only when the soil material is moderately
establishment of an appropriate, deep taproot
dry to moderately moist. Neither one of the two-phases, deep ripping nor decompaction (deep
3 4
Page 302 of 359
Page 303
subsoiling), can be effectively conducted when the soil material (subsoil or replaced topsoil) is in rainfall infiltration are being restored, a policy limiting all further traffic to permanent travel lanes
either a “plastic” or “liquid” state of soil consistency. Pulling the respective implements legs is maintained.
through the soil when it is overly moist only results in the “slicing and smearing” of the material or
added “squeezing and compression” instead of the necessary fracturing. Ample drying time is The other critical elements, outlined below, are: using the proper implements (deep, heavy-duty
needed for a “rippable” soil condition not merely in the material close to the surface, but rippers and subsoilers), and ample pulling-power equipment (tractors); and conducting the practice
throughout the material located down to the bottom of the physically compressed zone of the at the appropriate speed, depth and pattern(s) of movement.
subsoil.
Note that an appropriate plan for the separate practice of establishing a healthy perennial ground
The “poor man’s Atterberg field test” for soil cover, with deep rooting to help maintain the restored soil structure, should be developed in
plasticity is a simple “hand-roll” method used advance. This may require the assistance of an agronomist or landscape horticulturist.
for quick, on-site determination of whether or
not the moisture level of the affected soil
material is low enough for: effective deep Implements
ripping of subsoil; respreading of topsoil in a Avoid the use of all undersize implements. The small-to-medium, light-duty tool will, at best, only
friable state; and final decompaction (deep “scarify” the uppermost surface portion of the mass of compacted subsoil material. The term
subsoiling). Using a sample of soil material “chisel plow” is commonly but incorrectly applied to a broad range of implements. While a few
obtained from the planned bottom depth of may be adapted for the moderate subsoiling of non-impacted soils, the majority are less durable
ripping, e.g.: 20 - 24 inches below exposed and used for only lighter land-fitting (see Figure 6).
subsoil surface, the sample is hand rolled
between the palms down to a 1/8-inch diameter
thread. (Use the same test for stored topsoil Fig. 5. Augered from a depth of 19 inches
material before respreading on the site.) If the below the surface of the replaced topsoil,
respective soil sample crumbles apart in this subsoil sample was hand rolled to a
segments no greater than 3/8 of an inch long, by 1/8-inch diameter. The test shows the soil at
the time it is rolled down to 1/8 inch diameter, it this site stretches out too far without
is low enough in moisture for deep ripping (or crumbling; it indicates the material is in a
topsoil replacement), and decompaction. plastic state of consistence, too wet for final
Conversely, as shown in Figure 5, if the rolled decompaction (deep subsoiling) at this time.
sample stretches out in increments greater than
3/8 of an inch long before crumbling, it is in a “plastic” state of soil consistency and is too wet for
subsoil ripping (as well as topsoil replacement) and final decompaction.
Fig. 6. A light duty chisel implement, not Fig. 7. One of several variations of an
adequate for either the deep ripping or agricultural ripper. This unit has long, rugged
Design Guidance
shanks mounted on a steel V-frame for deep,
decompaction (deep subsoiling) phase.
aggressive fracturing through Phase 1.
Beyond the above-noted site factors, a vital requirement for the effective Deep Ripping and
Decompaction (deep subsoiling), is implementing the practice in its distinct, two-phase process:
Use a “heavy duty” agricultural-grade, deep ripper (see Figures 7,9,10 and 11) for the first phase:
1) Deep rip the affected thickness of exposed subsoil material (see Figure 10 and 11), aggressively the lateral and vertical fracturing of the mass of exposed and compressed subsoil, down and
fracturing it before the protected topsoil is reapplied on the site (see Figure 12); and through, to the bottom of impact, prior to the replacement of the topsoil layer. (Any oversize rocks
which are uplifted to the subsoil surface during the deep ripping phase are picked and removed.)
2) Decompact (deep subsoil), simultaneously through the restored topsoil layer and the upper half Like the heavy-duty class of implement for the first phase, the decompaction (deep subsoiling) of
of the affected subsoil (Figure 13). The second phase, “decompaction,” mitigates the partial Phase 2 is conducted with the heavy-duty version of the deep subsoiler. More preferable is the
recompaction which occurs during the heavy process of topsoil spreading/grading. Prior to deep angled-leg variety of deep subsoiler (shown in Figures 8 and 13). It minimizes the inversion of the
ripping and decompacting the site, all construction activity, including construction equipment and subsoil and topsoil layers while laterally and vertically fracturing the upper half of the previously
material storage, site cleanup and trafficking (Figure 14), should be finished; and the site closed off ripped subsoil layer and all of the topsoil layer by delivering a momentary, wave-like “lifting and
to further disturbance. Likewise, once the practice is underway and the area’s soil permeability and shattering” action up through the soil layers as it is pulled.
5 6
Page 303 of 359
Page 304
Pulling-Power of Equipment Depth and Patterns of Movement
Use the following rule of thumb for tractor horsepower (hp) whenever deep ripping and As previously noted both Phase 1 Deep Ripping through significantly compressed, exposed subsoil
decompacting a significantly impacted site: For both types of implement, have at least 40 hp of and Phase 2 Decompaction (deep subsoiling) through the replaced topsoil and upper subsoil need
tractor pull available for each mounted shank/ leg. to be performed at maximum capable depth of each implement. With an implement’s guide wheels
attached, some have a “normal” maximum operating depth of 18 inches, while others may go
Using the examples of a 3-shank and a 5-shank implement, the respective tractors should have 120 deeper. In many situations, however, the tractor/implement operator must first remove the guide
and 200 hp available for fracturing down to the final depth of 20-to-24 inches per phase. Final wheels and other non essential elements from the implement. This adapts the ripper or the deep
depth for the deep ripping in Phase 1 is achieved incrementally by a progressive series of passes subsoiler for skillful pulling with its frame only a few inches above surface, while the shanks or
(see Depth and Patterns of Movement, below); while for Phase 2, the full operating depth of the legs, fracture the soil material 20-to-24 inches deep.
deep subsoiler is applied from the beginning.
There may be construction sites where the depth of the exposed subsoil’s compression is moderate,
The operating speed for pulling both types of e.g.: 12 inches, rather than deep. This can be verified by using a ¾ inch cone penetrometer and a
implement should not exceed 2 to 3 mph. At shovel to test the subsoil for its level of compaction, incrementally, every three inches of
this slow and managed rate of operating speed, increasing depth. Once the full thickness of the subsoil’s compacted zone is finally “pieced” and
maximum functional performance is sustained there is a significant drop in the psi measurements of the soil penetrometer, the depth/thickness of
by the tractor and the implement performing the compaction is determined. This is repeated at several representative locations of the construction
soil fracturing. Referring to Figure 8, the site. If the thickness of the site’s subsoil compaction is verified as, for example, ten inches, then
implement is the 6-leg version of the deep the Phase 1 Deep Ripping can be correspondingly reduced to the implement’s minimum operable
angled-leg subsoiler. Its two outside legs are depth of 12 inches. However, the Phase 2 simultaneous Decompation (subsoiling) of an 11 inch
“chained up” so that only four legs will be thick layer of replaced topsoil and the upper subsoil should run at the subsoiling implements full
engaged (at the maximum depth), requiring no operating depth.
less than 160 hp, (rather than 240 hp) of pull.
The 4-wheel drive, articulated-frame tractor in
Figure 8 is 174 hp. It will be decompacting this Fig. 8. A deep, angled-leg subsoiler, ideal for
unobstructed, former construction access area Phase 2 decompaction of after the topsoil layer
simultaneously through 11 inches of replaced is graded on top of the ripped subsoil.
topsoil and the upper 12 inches of the
previously deep-ripped subsoil. In constricted
areas of Phase 1) Deep Ripping, a medium-size
tractor with adequate hp, such as the one in
Figure 9 pulling a 3-shank deep ripper, may be
more maneuverable.
Some industrial-grade variations of ripping Fig. 10. An early pass with a 3-shank deep Fig. 11. A repeat run of the 3-shank ripper
implements are attached to power graders and ripper penetrating only 8 inches into this along the same patterned pass area as Fig. 9;
bulldozers. Although highly durable, they are worksite’s severely compressed subsoil. here, incrementally reaching 18 of the needed
generally not recommended. Typically, the 22 inches of subsoil fracture.
shanks or “teeth” of these rippers are too short
and stout; and they are mounted too far apart to
achieve the well-distributed type of lateral and Fig. 9. This medium tractor is pulling a 3- Typically, three separate series (patterns) are used for both the Phase 1 Deep Ripping and the
vertical fracturing of the soil materials shank deep ripper. The severely compacted Phase 2 Decompaction on significantly compacted sites. For Phase 1, each series begins with a
necessary to restore soil permeability and construction access corridor is narrow, and the moderate depth of rip and, by repeat-pass, continues until full depth is reached. Phase 2 applies the
infiltration. In addition, the power graders and 120 hp tractor is more maneuverable for Phase full depth of Decompation (subsoiling), from the beginning.
bulldozers, as pullers, are far less maneuverable 1 deep ripping (subsoil fracturing), here.
for turns and patterns than the tractor. Every separate series (pattern) consists of parallel, forward-and-return runs, with each progressive
7 8
Page 304 of 359
Page 305
pass of the implement’s legs or shanks evenly staggered between those from the previous pass.
This compensates for the shank or leg-spacing on the implement, e.g., with 24-to-30 inches Ɣ A second series of passes makes a broad “S” shaped pattern of rips, continually
between each shank or leg. The staggered return pass ensures lateral and vertical fracturing and gradually alternating the “S” curves between opposite edges inside the
actuated every 12 to 15 inches across the densely compressed soil mass. compacted corridor.
Large, Unobstructed Areas Ɣ The third and final series again uses the broad, alternating S pattern, but it is
For larger easy areas, use the standard patterns of movement: “flip-flopped” to continually cross the previous S pattern along the corridor’s
centerline. This final series of the S pattern curves back along the edge areas
Ɣ The first series (pattern) of passes is applied lengthwise, parallel with the longest skipped by the second series.
spread of the site; gradually progressing across the site’s width, with each
successive pass. Maintenance and Cost
Ɣ The second series runs obliquely, crossing the first series at an angle of Once the two-phase practice of Deep Ripping and Decompation is completed, two items are
about 45 degrees. essential for maintaining a site’s soil porosity and permeability for infiltration. They are: planting
and maintaining the appropriate ground cover with deep roots to maintain the soil structure (see
Ɣ The third series runs at right angle (or 90 degrees), to the first series to complete Figure 15); and keeping the site free of traffic or other weight loads.
the fracturing and shattering on severely compacted sites, and avoid leaving large
unbroken blocks of compressed soil material. (In certain instances, the third series Note that site-specific choice of an appropriate vegetative ground-cover seed mix, including the
may be optional, depending on how thoroughly the first two series loosen the proper seeding ratio of one or more perennial species with a deep taproot system and the proper
material and eliminate large chunks/blocks of material as verified by tests with a ¾- amount of lime and soil nutrients (fertilizer mix) adapted to the soil-needs, are basic to the final
inch cone penetrometer.) practice of landscaping, i.e: surface tillage, seeding/planting/fertilizing and culti-packing or
mulching is applied. The "maintenance" of an effectively deep-ripped and decompacted area is
generally limited to the successful perennial (long-term) landscape ground cover; as long as no
weight-bearing force of soil compaction is applied.
Fig. 13. The same deep, angled-leg subsoiler
Fig. 12. Moderately dry topsoil is being
shown in Fig. 7 is engaged at maximum
replaced on the affected site now that Phase 1
depth for Phase 2, decompaction (deep
deep ripping of the compressed subsoil is
soiling), of the replaced topsoil and the upper Fig. 15. The same site as Fig. 14 after deep
complete. Fig. 14. The severely compacted soil of a
subsoil materials. ripping of the exposed subsoil, topsoil
temporary construction yard used daily by replacement, decompaction through the
heavy equipment for four months; shown topsoil and upper subsoil and final surface
before deep ripping, topsoil replacement, and tillage and revegetation to maintain soil
Corridors
decompaction. permeability and infiltration.
In long corridors of limited width and less maneuverability than larger sites, e.g.: along
compacted areas used as temporary construction access, a modified series of pattern passes
are used.
Ɣ First, apply the same initial lengthwise, parallel series of passes described above.
9 10
Page 305 of 359
Page 306
The Deep Ripping and Decompaction practice is, by necessity, more extensive than periodic Resources
subsoiling of farmland.The cost of deep ripping and decompacting (deep subsoiling), will vary
according to the depth and severity of soil-material compression and the relative amount of Publications:ȱ
tractor and implement time that is required. In some instances, depending on open ȣȱAmericanȱȱSocietyȱofȱȱAgriculturalȱEngineers.ȱ1971.ȱȱCompactionȱofȱȱAgriculturalȱȱSoils.ȱȱASAE.ȱ
maneuverability, two-to-three acres of compacted project area may be deep-ripped in one day. In ȱ
other situations of more severe compaction and - or less maneuverability, as little as one acre may ȣȱBrady,ȱN.C.,ȱandȱR.R.ȱWeil.ȱ2002.ȱȱTheȱȱNatureȱȱandȱȱPropertiesȱȱofȱȱSoils.ȱ13thȱed.ȱPearsonȱEducation,ȱInc.ȱ
be fully ripped in a day. Generally, if the Phase 1) Deep Ripping is fully effective, the Phase 2) ȱ
Decompaction should be completed in 2/3 to 3/4 of the time required for Phase 1. ȣȱBaver,ȱL.D.ȱ1948.ȱSoilȱPhysics.ȱJohnȱWileyȱ&ȱSons.ȱ
ȱ
Using the example of two acres of Phase 1) Deep Ripping in one day, at $1800 per day, the net ȣȱCarpachi,ȱN.ȱ1987ȱ(1995ȱfifthȱprinting).ȱExcavationȱandȱGradingȱHandbook,ȱRevised.ȱȱ2ndȱed.ȱCraftsmanȱBookȱ
cost is $900 per acre. If the Phase 2) Decompacting or deep subsoiling takes 3/4 the time as Phase Companyȱ
1, it costs $675 per acre for a combined total of $1575 per acre to complete the practice (these ȣȱEllis,ȱB.ȱ(Editor).ȱ1997.ȱȱSafeȱ&ȱEasyȱLawnȱCare:ȱȱTheȱCompleteȱGuideȱtoȱOrganicȱLowȱMaintenanceȱLawn.ȱȱ
figures do not include the cost of the separate practice of topsoil stripping and replacement). Due HoughtonȱMifflin.ȱ
to the many variables, it must be recognized that cost will be determined by the specific conditions ȱ
or constraints of the site and the availability of proper equipment. ȣȱ Harpstead,ȱ M.I.,ȱ T.J.ȱ Sauer,ȱ andȱ W.F.ȱ Bennett.ȱ 2001.ȱ ȱ Soilȱ Scienceȱ Simplified.ȱ 4thȱ ed.ȱ Iowaȱ Stateȱ Universityȱȱ
Press.ȱ
ȱ
ȣȱ ȱ Magdoff,ȱ F.,ȱ ȱ andȱ ȱ H.ȱ vanȱ Es.ȱ ȱ 2000.ȱ ȱ Buildingȱ Soilsȱ ȱ forȱ ȱ Betterȱ Crops.ȱ 2ndȱ ed.ȱ Sustainableȱ Agriculturalȱ
Networksȱ
ȱ
ȣȱȱMcCarthy,ȱD.F.ȱ1993.ȱEssentialsȱofȱSoilȱMechanicsȱandȱFoundations,ȱBasicȱGeotechnicsȱ4thȱed.ȱRegents/Prenticeȱ
Hall.ȱ
ȱ
ȣȱȱȱȱȱȱPlaster,ȱE.J.ȱ1992.ȱSoilȱScienceȱ&ȱManagement.ȱ3rdȱed.ȱDelmarȱPublishers.ȱ
ȱ
ȣȱ ȱ ȱ Unionȱ Gasȱ Limited,ȱ Ontario,ȱ Canada.ȱ 1984.ȱ Rehabilitationȱ ofȱ Agriculturalȱ Lands,ȱ DawnȬKerwoodȱ ȱ Loopȱȱ
Pipeline;ȱȱȱTechnicalȱȱȱReport.ȱȱȱEcologicalȱȱȱServicesȱȱforȱȱPlanning,ȱȱLtd.;ȱRobinson,ȱMerrittȱ&ȱDevries,ȱ
Ltd.ȱandȱSmith,ȱHoffmanȱAssociates,ȱLtd.ȱ
ȱ
ȣȱȱȱUSȱDepartmentȱofȱAgricultureȱinȱcooperationȱwithȱCornellȱUniversityȱAgriculturalȱExperimentȱȱStation.ȱȱ
Variousȱyears.ȱȱSoilȱȱSurveyȱofȱȱ(variousȱnames)ȱȱCounty,ȱȱNewȱYork.ȱUSDA.ȱ
ȱ
InternetȱAccess:ȱ
ȣȱȱȱȱExamplesȱofȱimplements:ȱȱ
ȱVȬRippers.ȱȱAccessȱbyȱȱinternetȱsearchȱofȱJohnȱDeereȱAgȱȬNewȱEquipmentȱȱȱforȱȱ915ȱȱ(largerȬframeȱmodel)ȱȱVȬ
Rippe;ȱȱand,ȱȱȱforȱ913ȱȱ(smallerȬframeȱmodel)ȱVȬRipper.ȱȱDeep,ȱangledȬlegȱsubsoiler.ȱȱAccessȱȱbyȱȱinternetȱ
searchȱȱof:ȱBighamȱȱBrothersȱShearȱBoltȱȱParatillȬSubsoiler.ȱ
http://salesmanual.deere.com/sales/salesmanual/en_NA/primary_tillage/2008/feature/rippers/915v_pattern_frame.html?sbu=a
g&link=prodcat LastȱvisitedȱMarchȱ08.ȱ
ȱ
ȣȱ Soilsȱ dataȱ ofȱ USDAȱ Naturalȱ Resourcesȱ Conservationȱ Service.ȱ NRCSȱ Webȱ Soilȱ Survey.ȱȱȱȱȱȱȱȱȱȱȱȱȱȱ
http://websoilsurvey.nrcs.usda.gov/app/ȱȱȱandȱȱUSDAȬNRCSȱȱOfficialȱȱSoilȱȱSeriesȱDescriptions;ȱViewȱbyȱ
Name.ȱhttp://ortho.ftw.nrcs.usda.gov/cgiȬbin/osd/osdname.cgiȱ.ȱLastȱvisitedȱJan.ȱ08.ȱ
ȱ
ȣȱȱSoilȱȱpenetrometerȱȱinformation.ȱȱAccessȱȱbyȱȱȱinternetȱȱsearchesȱȱof:ȱȱȱDiagnosingȱSoilȱCompactionȱȱȱusingȱȱaȱ
Penetrometerȱ(soilȱcompactionȱtester),ȱPSUȱExtension;ȱȱasȱȱwellȱȱasȱDickeyȬjohnȱSoilȱCompactionȱTester.ȱ
http://www.dickey-johnproducts.com/pdf/SoilCompactionTest.pdf and http://cropsoil.psu.edu/Extension/Facts/uc178pdf Lastȱ
visitedȱSept.ȱ07ȱ
11 12
Page 306 of 359
Page 307
Page 307 of 359
Page 308
Appendix f:
Labella certifying
professionals letter
Page 308 of 359
Page 309
Page 309 of 359
Page 310
February 21, 2025
RE: LaBella Certifying Professionals for NYSDEC SPDES GP-0-25-001
To Whom it May Concern:
In accordance with the NYSDEC SPDES General Permit GP-0-25-001, Part VII.J.2, Kristopher Winkler,
PE, a New York State Qualified Professional employed by LaBella Associates, is duly authorized to sign
and seal Stormwater Pollution Prevention Plans (SWPPPs), Notice of Intents (NOIs) and Notice of
Terminations (NOTs).
Respectfully submitted,
LaBella Associates
Timothy Webber Kristopher Winkler, PE
Vice President, Civil Division Director Senior Civil Engineer
Team Leader
Page 310 of 359
Page 311
Page 311 of 359
Page 312
Appendix G:
Nysdec spdes general permit
gp-0-25-001
Page 312 of 359
Page 313
Page 313 of 359
Page 314
Page 314 of 359
Page 315
Page 315 of 359
Page 316
Page 316 of 359
Page 317
Page 317 of 359
Page 318
Page 318 of 359
Page 319
Page 319 of 359
Page 320
Page 320 of 359
Page 321
Page 321 of 359
Page 322
Page 322 of 359
Page 323
Page 323 of 359
Page 324
Page 324 of 359
Page 325
Page 325 of 359
Page 326
Page 326 of 359
Page 327
Page 327 of 359
Page 328
Page 328 of 359
Page 329
Page 329 of 359
Page 330
Page 330 of 359
Page 331
Page 331 of 359
Page 332
Page 332 of 359
Page 333
Page 333 of 359
Page 334
Page 334 of 359
Page 335
Page 335 of 359
Page 336
Page 336 of 359
Page 337
Page 337 of 359
Page 338
Page 338 of 359
Page 339
Page 339 of 359
Page 340
Page 340 of 359
Page 341
Page 341 of 359
Page 342
Page 342 of 359
Page 343
Page 343 of 359
Page 344
Page 344 of 359
Page 345
Page 345 of 359
Page 346
Page 346 of 359
Page 347
Page 347 of 359
Page 348
Page 348 of 359
Page 349
Page 349 of 359
Page 350
Page 350 of 359
Page 351
Page 351 of 359
Page 352
Page 352 of 359
Page 353
Page 353 of 359
Page 354
Page 354 of 359
Page 355
Page 355 of 359
Page 356
Page 356 of 359
Page 357
Page 357 of 359
Page 358
Page 358 of 359
Page 359
Page 359 of 359