Southtowns Record

Town Board agenda packet — July 13, 2026 (full text)

Town of Aurora Town Board Jul 13, 2026 74 pages

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Page 1

Town of Aurora cc Warrant Report a Unposted Batch Totals Invoice Batch Manual Checks Purchase Cards Total Fund Fund Description $0.00 $0.00 Unposted Batch Grand Totals Posted Batch Totals Invoice Batch Manual Checks Purchase Cards Total Fund Fund Description Paid Unpaid Paid Unpaid Paid Unpaid Paid Unpaid $57,385.41 $0.00 $0.00 $0.00 $0.00 $0.00 $57,385.41 $0.00 AQO GENERAL FUND $11.84 $0.00 $0.00 $0.00 $0.00 $0.00 $11.84 $0.00 Boo PART TOWN FUND FUND $29,235.75 $0.00 $0.00 $0.00 $0.00 $0.00 $29,235.75 $0.00 DBO HIGHWAY PART TOWN $67,941.09 $0.00 $0.00 $0.00 $0.00 $0.00 $67,941.09 $0.00 H70 VILLAGE BRIDGE REPAIRS $3,400.99 $0.00 $0.00 $0.00 $0.00 $0.00 $3,400.99 $0.00 SFO FIRE PROTECTION DIST. NO 1 RUBBISH COLLECTION DISTRICT #1 $856.35 $0.00 $0.00 $0.00 $0.00 $0.00 $856.35 $0.00 SRO TRUST AND AGENCY $19,336.26 $0.00 $0.00 $0.00 $0.00 $0.00 $19,336.26 $0.00 TAO SW6 - WATER DISTRICT 6 $13,503.00 $0.00 $0.00 $0.00 $0.00 $0.00 $13,503.00 $0.00 W60 WATER DISTRICT 6 EXT 1 $9,119.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9,119.00 $0.00 WKO WATER DISTRICT 6 EXT 2 $2,222.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,222.00 $0.00 woo WATER IMPROVEMENT AREA #5 $3,439.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,439.00 $0.00 WPO ZPO PRIVATE WATER SYSTEM $1,967.05 $0.00 $0.00 $0.00 $0.00 $0.00 $1,967.05 $0.00 Posted Batch Grand Totals $208,417.74 $0.00 $0.00 $0.00 $0.00 $0.00 $208,417.74 $0.00 Report Grand Totals Fund Fund Description Invoice Batch Manual Checks Purchase Cards Total Paid Unpaid Paid Unpaid Paid Unpaid Paid Unpaid A00 GENERAL FUND $57,385.41 $0.00 $0.00 $0.00 $0.00 $0.00 $57,385.41 $0.00 BOO PART TOWN FUND $11.84 $0.00 $0.00 $0.00 $0.00 $0.00 $11.84 $0.00 DBO HIGHWAY PART TOWN FUND $29,235.75 $0.00 $0.00 $0.00 $0.00 $0.00 $29,235.75 $0.00 H70 VILLAGE BRIDGE REPAIRS $67,941.09 $0.00 $0.00 $0.00 $0.00 $0.00 $67,941.09 $0.00 SFO FIRE PROTECTION DIST. NO 1 $3,400.99 $0.00 $0.00 $0.00 $0.00 $0.00 $3,400.99 $0.00 SRO RUBBISH COLLECTION DISTRICT #1 $856.35 $0.00 $0.00 $0.00 $0.00 $0.00 $856.35 $0.00 TAO TRUST AND AGENCY $19,336.26 $0.00 $0.00 $0.00 $0.00 $0.00 $19,336.26 $0.00 W60 SW6 - WATER DISTRICT 6 $13,503.00 $0.00 $0.00 $0.00 $0.00 $0.00 $13,503.00 $0.00 WKO WATER DISTRICT 6 EXT 1 $9,119.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9,119.00 $0.00 WOO WATER DISTRICT 6 EXT 2 $2,222.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,222.00 $0.00 WPO WATER IMPROVEMENT AREA #5 $3,439.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,439.00 $0.00 ZPO PRIVATE WATER SYSTEM $1,967.05 $0.00 $0.00 $0.00 $0.00 $0.00 $1,967.05 $0.00 Grand Totals $208,417.74 $0.00 $0.00 $0.00 $0.00 $0.00 $208,417.74 $0.00 /2U ApsteactTe of ACSi-aims4 : BS#(S13 \oucerte # t

Page 2

SUPERVISOR TOWN CLERK Charles D. Snyder Jeanne H. Viger (716) 652-7590 (716) 652-3280 [email protected] [email protected] TOWN OF AURORA Aurora Municipal Center 575 Oakwood Avenue, East Aurora, NY 14052 ul f www.townofaurora.com To: Aurora Town Board From: Kathleen Moffat Date: July 13, 2026 Re: Azar Design Co. (formerly Foit-Albert) Payments: Bridge Projects Please consider approval of the following payments to Azar Design Co: e No. 14 in the amount of $19,533.87 for professional services rendered from 5/30/26- 6/26/26 for the Shearer Ave. culvert replacement project e No. 16 in the amount of $27,697.16 for professional services rendered from 5/30/26- 6/26/26 for the Cornwall Rd. culvert replacement project e No. 13 in the amount of $20,710.06 for professional services rendered from 5/30/26- 6/26/26 for the Brooklea Dr. bridge replacement project. Funds will be disbursed from H7 5120.210.

Page 3

LETTER OF TRANSMITTAL DESIGN CO Date: July 6, 2026 FORMERLY FOIT-ALBERT ASSOCIATES Project No. 240300.03 TO: Town of Aurora RE: Shearer Ave over Tannery Brook David Gunner — [email protected] PIN 5765.54 Martha Librock — [email protected] 575 Oakwod Avenue East Aurora, NY 14052 WE ARE SENDING YOU [X] Attached [_] Under separate cover via the following items: []Shop drawings L ]Prints [Plans [ |samples [ |Specifications [|Copy of letter [_]change order rT] 1 7/06/26 14 Consultants Payment Request ACTION CODE: 1 For approval 6 No exceptions taken 11 Return ___ corrected prints 2 For your use 7 Make corrections noted 12 Prints returned after loan to us 3 As requested 8 Revise & resubmit___ copies for review 13 4 For review and comment 9 Rejected 5 For bids due 10 Submit___ copies for distribution Please process for payment. Thank you, Email: [email protected] COPY TO X CENTRAL FILE SIGNED Scott Dabb, Accounting Manager

Page 4

DESIGN CO FORMERLY FOIT-ALBERT ASSOCIATES RE: Shearer Ave over Tannery Brook PIN 5765.54 Progress Report No. 14: May 30, 2026 through June 26, 2026 Achievements e Continued final design plans e Advanced bid book. e Advanced a detailed estimate Scheduled Statement e . The project should meet the schedule. Budget Statement e On Budget. Planned For Next Month © Submit ADP’s e Advance all items fora PS&E submittal e Begin ROW acquisition Items Required e Nothing at this time Very truly yours, Gerard J. Sentz, P.E. Vice President Foit-Albert Associates ” Guffate 295 Mein Street, Suite 200 / Buffala, NY 14203 / 716.856.3933 Alizzay 436 New Karner Road / Albany, NY 12205 / 518.452.1037 VEOR, 83 Y Siate Streat, Suite 201} Ithaca, NY 14850 /G07.286.2086 = Man hatter 215 West 94th Street, Suite SIT / New York, N¥ 10025 / 212.372.4813 pert: & 89-31 iSist Streey, Suite 901! Jar maica, NY 11432 / 718.374.3422 Phllachdshis 1235, Broad Street / 78th Floor / Phitadelphia, PA 1109

Page 5

FEDERAL AID PROJECT SPONSOR CONSULTANT REIMBURSEMENT REQUEST FIN 421 LL (05/12) PAYEE ID: 16-1210859 NYS Comptroller's Contract No. Est. No. 14 (FEDERAL ID) , . : Work Petiod (this est.) FROM 05/30/26 TO 06/26/26. Payee Name: Azar Design Co., Formerly Foit-Albert Assoc Current Completion Date 295 Main Street, Suite 200 MIR Date _/ / . Buffalo (completed by SPONSOR) New York : 14203 { Original Contract Amount $251,392.59 Current Contract Amount $251,392.59 (includes thru approved S.A. NO. ) RRDA NO. (if applicable) Consultant Sponsor Prepares use only 1. Total work reported on previous estimates $144,320.16 2. Work reported on this estimate $19,533.87 3. Total work reported to date (must equal page 2) $163,854.03 4, Adjustments (Sponsor use only) Reason _ - | 5. Retainage thru current estimate $0.00 6. Total work reported less retainage ; $163,854.03 7. Previous payments : $144,320.16 8. Payment requested or processed $19,533.87 CERTIFICATION BY CONSULTANT I, Scott W. Dabb. , do hereby certify that lam Controller of Azar Design Co, consultant for the work referred to in the foregoing reimbursement request, that I am the person in whose name, the foregoing account against the State of New York is rendered; that the labor, materials, expenses or services charged for were actually delivered, incurred or rendered, as named, heretofore, and that the prices charged are just and reasonable; that the expenses detailed herein were actually incurred; that the services specified were actually rendered as charged; and further, that no percentage or compensation has been paid or promised to be paid to any manager, trustee, officer or employee of said institution, department, board of commission by reason of the claimant having been allowed to sell to, incur expenses for, or render services to, said institution; and also, that to the best of my knowledge and belief, no manager, trustee, officer or employee of said institution, department, board of commission has or has had, any interest directly or indirectly in said article, materials, expenses or services; and that no part of the foregoing account has been paid, and that the above statement is true and correct, By my signature I further certify that all partial payments due to subconsultants or subcontractors in accordance with Article 5 of the subject consultant agreement have been paid July 6, 2026 0 4 Zo gdVia Ue O hea lef y (DATE) (SIGNATURE) CERTIFICATION BY SPONSOR I, , do hereby certify that I am the (Name) (Title) in the supervision of the work described in the attached consultant's reimbursement request; that the materials, labors and services have been furnished and the work properly performed in accordance with the contract and that payment in the sum of $ can be made on this contract without detriment of the interests of the sponsor, to the best of my knowledge and belief. (DATE) (SIGNATURE)

Page 6

LETTER OF TRANSMITTAL DESIGN Date: July 6, 2026 co FORMERLY FOIT-ALBERT ASSOCIATES Project No. 240300.02 TO: Town of Aurora RE: Cornwall Rd Over Cazenovia Creek . David Gunner ~ [email protected] PINS765.55 . Martha Librock — [email protected] 575 Oakwod Avenue East Aurora, NY 14052 WE ARE SENDING YOU |X] Attached [_] Under separate cover via the following items: [|Shop drawings []Prints [ ]Plans [_|Samples ||Specifications [_Icopy of letter [-|change order TI 1 7/06/26 16 Consultants Payment Request . ACTION CODE: 1 For approval 6 No exceptions taken 11 Return corrected prints 2 For your use 7 Make corrections noted 12 Prints returned after loan to us 3 As requested 8 Revise & resubmit copies for review 13 4 For review and comment 9 Rejected 5 For bids due 10 Submit copies for distribution Please process for payment. Thank you, Email: [email protected] COPY TO x CENTRAL FILE SIGNED Scott Dabb, Accounting Manager

Page 7

CO _ FORMERLY FOIT-ALBERT ASSOCIATES RE: Cornwall Rd over Cazenovia Creek PIN 5765.55 Progress Report No. 16: May 30, 2026 through June 26, 2026 Achievements e Advanced the preliminary design and the culvert layout e Addressed the necessary environmental forms. Scheduled Statement e . The project is on schedule Budget Statement e On Budget. Planned For Next Month e Submit final DAD and receive Design Approval e Begin ADP submission Items Required e Any additional comments. Very truly yours, Gerard J. Sentz, P.E. | Vice President — Foit-Albert Associates Bufiaio 285 Main Street, Suite 200 / Buffalo, NY 14205 / TIG.SS6.3953 Albany 435 New Karner Read / Albany, NV 12205 7518. ASZIOS? efits ia WS State Streat, Suite 20% / ithaca, NY 14850 / 607.288.2088 ldanhattan 215 West 94th Street, Suite 517 / New York, NY 10025 / 272.272.4813 Queens 89-3) iist Street, Saite 301 / Jamaica, NY ‘a32? 7a, S74 352 2 Patledelphia 123 S. Broad Street / Sth Floor / Phifa adeiphia, PA IS109

Page 8

FEDERAL AID PROJECT SPONSOR CONSULTANT REIMBURSEMENT REQUEST FIN 421 LL (05/12) PAYEE JD: 16-1210859 NYS Comptroller's Contract No. Est. No. 16 (FEDERAL ID) Work Period (this est.) FROM 5/30/26 TO 06/26/26 Payee Name: Azar Design Co., Formerly Foit-Albert Assoc Current Completion Date 295 Main Street, Suite 200 . MIR Date _//. Buffalo (completed by SPONSOR) New York 14203 Original Contract Amount $253,750.56 Current Contract Amount $253,750.56 (includes thru approved S.A. NO. ) RRDA NO. (if applicable) Consultant Sponsor Prepares use only 1. Total work reported on previous estimates $138,550.47 2. Work reported on this estimate $27,697.16 3. Total work reported to date (must equal page 2) $166,247.63 4, Adjustments (Sponsor use only) Reason 5. Retainage thru current estimate $0.00 6. Total work reported less retaindge $166,247.63 7. Previous payments _ $138,550.47 8. Payment requested or processed $27,697.16 CERTIFICATION BY CONSULTANT I, Scott W. Dabb. , do hereby certify that I am Controller of Azar Design Co, consultant for the work referred to in the foregoing reimbursement request, that I am the person in whose name, the foregoing account against the State of New York is rendered; that the labor, materials, expenses or services charged for were actually delivered, incurred or rendered, as named, heretofore, and that the prices charged are just and reasonable; that the expenses detailed herein were actually incurred; that the services specified were actually rendered as charged; and further, that no percentage or compensation has been paid or promised to be paid to any manager, trustee, officer or employee of said institution, department, board of commission by reason of the claimant having been allowed to sell to, incur expenses for, or render services to, said institution; and also, that to the best of my knowledge and belief, no manager, trustee, officer or employee of said institution, department, board of commission has or has had, any interest directly or indirectly in said article, materials, expenses or services; and that no part of the foregoing account has been paid, and that the above statement is true and correct. By my signature I further certify that all partial payments due to subconsultants or subcontractors in accordance with Article 5 of the subject consultant agreement have been paid. July 6, 2026 0 Le Zo Wer Via (hag ae (DATE) (SIGNATURE) CERTIFICATION BY SPONSOR IL, » do hereby certify that I am the (Name) (Title) in the supervision of the work described in the attached consultant's reimbursement request; that the materials, labors and services have been furnished and the work properly performed in accordance with the contract and that payment in the sum of $ can be made on this contract without detriment of the interests of the sponsor, to the best of my knowledge and belief. (DATE) (SIGNATURE)

Page 9

LETTER OF TRANSMITTAL DESIGN CO Date: July 6, 2026 FORMERLY FOIT-ALBERT ASSOCIATES Project No. 240300.01 TO: Town of Aurora RE: Brooklea Drive over Tannery Brook David Gunner — [email protected] . PIN 5765.46 . Martha Librock — [email protected] 575 Oakwood Avenue East Aurora, NY 14052 WE ARE SENDING YOU [X] Attached [_] Under separate cover via the following items: [_|Shop drawings [ |Prints [_]Plans | |Samples ||Specifications [|Copy of letter [_]Change order 7] 1 7/06/26 13 Consultants Payment Request { ACTION CODE: 1 For approval 6 No exceptions taken 11 Return ___ corrected prints 2 For your use 7 Make corrections noted 12 Prints returned after loan to us 3 As requested 8 Revise & resubmit copies for review 13 4 For review and comment 9 Rejected 5 For bids due 10 Submit copies for distribution Please process for payment. Thank you, Email: [email protected] COPY TO x CENTRAL FILE SIGNED Scott Dabb, Accounting Manager

Page 10

CO FORMERLY FOIT-ALBERT ASSOCIATES RE: Brooklea Drive over Tannery Brook PIN 5765.46 Progress Report No. 13: May 30, 2026 through June 26, 2026 Achievements Updated all sections of the DAD. Advanced preliminary design and coordinated with the bridge design company Addressed environmental comments. e Held for a public meeting Scheduled Statement e The project is on schedule Budget Statement e On Budget. Planned For Next Month e Finalize the draft DAD and request final Design Approval Items Required e Nothing at this time. Very truly yours, Gerard J. Sentz, P.E. Vice President Foit-Albert Associates Eas a a 285 Main Stra. et, Suite ravens / Buffalo, NY 14.203 / TIG.G56 3933 Albacy 5 he r Read / Albany, NY 12205 / 518.452,1037 aOR V3 Wy $ta te Straeat, Sul 2 204 7 Ithaca, ae 14850 / 607, 288, 2088 tdant Ss Wast 94th Sereet, “Sur ite SIF / Nev w York, NY 30025 / 222.372.4813 Queene 89-31 let S! eet, Sul tw oO) Pam a, NY N432 / 733.374 3422 phia 123 S. Groad Street / 18th Floor / Philadelphia, PA 19109:

Page 11

FEDERAL AID PROJECT SPONSOR CONSULTANT REIMBURSEMENT REQUEST FIN 421 LL (05/12) PAYEE ID: 16-1210859 NYS Comptroller's Contract No. | Est. No. 13 (FEDERAL ID) Work Period (this est.) FROM 05/30/26 TO 06/26/26 Payee Name: Azar Design Co., Formerly Foit-Albert Assoc Current Completion Date 295 Main Street, Suite 200 MIR Date _//. Buffalo (completed by SPONSOR) New York 14203 Original Contract Amount $316,500.00 Current Contract Amount $316,500.00 (includes thru approved S.A. NO. ) RRDA NO. (if applicable) Consultant Sponsor Prepares use only 1. Total work reported on previous estimates $141,741.09 2. Work reported on this estimate $20,710.06 3. Total work reported to date (must equal page 2) $162,451.15 4. Adjustments (Sponsor use only) Reason 5. Retainage thru current estimate $0.00 6. Total work reported less retainage $162,451.15 7. Previous payments $141,741.09 8. Payment requested or processed $20,710.06 CERTIFICATION BY CONSULTANT I, Scott W. Dabb. , do hereby certify that [am Controller of Azar Design Co, consultant for the work referred to in the foregoing reimbursement request, that I am the person in whose name, the foregoing account against the State of New York is rendered; that the labor, materials, expenses or services charged for were actually delivered, incurred or rendered, as named, heretofore, and that the prices charged are just and reasonable; that the expenses detailed herein were actually incurred; that the services specified were actually rendered as charged; and further, that no percentage or compensation has been paid or promised te be paid to any manager, trustee, officer or employee of said institution, department, board of commission by reason of the claimant having been allowed to sell to, incur expenses for, or render services to, said institution; and also, that to the best of my knowledge and belief, no manager, trustee, officer or employee of said institution, department, board of commission has or has had, any interest directly or indirectly in said article, materials, expenses or services; and that no part of the foregoing account has been paid, and that the above statement is true and correct. By my signature I further certify that all partial payments due to subconsultants or subcontractors in accordance with Article 5 of the subject consultant agreement have been paid. LO It vy Oh 0 4 MEO tale July 6, 2026 (DATE) (SIGNATURE) CERTIFICATION BY SPONSOR © I, ; do hereby certify that Iam the (Name) (Title) in the supervision of the work described in the attached consultant's reimbursement request; that the materials, labors and services have been furnished and the work properly performed in accordance with the contract and that payment in the sum of $ can be made on this contract without detriment of the interests of the sponsor, to the best of my knowledge and belief. (DATE) (SIGNATURE)

Page 12

TOWN OF AURORA 4B. | SEQR RESOLUTION 1627 Bailey Rd (SBL#200.00-3-2) RESOLVED that the Town Board of the Town of Aurora declares itself as an interested agency with regard to SEQR for the Site Plan application to install a ground mounted solar array for SBL# 200.00-3-2 at 1627 Bailey Road; and further RESOLVED that after considering the action stated herein, reviewing the criteria contained in Section 617.11 of the Rules and Regulations of the State Environmental Quality Review Act, determines that the action is an Unlisted action; and further RESOLVED that the Town Board of the Town of Aurora has determined that this Unlisted action will result in no significant adverse impacts on the environment, and therefore, an environmental impact statement need not be prepared; and further RESOLVED that a negative declaration is issued with regard to the Site Plan for a ground mounted solar array installation at 1627 Bailey Road, East Aurora, NY.

Page 13

TOWN OF AURORA 48.2 RESOLUTION APPROVING SITE PLAN 1627 Bailey Road (SBL# 200.00-3-2) Whereas, Damien Parker has submitted a Site Plan Review Application to install a ground mounted solar array for SBL#200.00-3-2 at 1627 Bailey Road, East Aurora NY; and Whereas, at their May 6, 2026 meeting the Aurora Town Planning Board recommended approval of the site plan; and Whereas, the Code Enforcement Officer determined this to be an unlisted action under SEQR and the Town Board found that the project will not result in any significant adverse environmental impacts. Now, therefore, be it RESOLVED that the Site Plan for SBL#200.00-3-2 at 1627 Bailey Road, East Aurora, NY, to install a ground mounted solar array is approved by the Town Board.

Page 14

UC. \ TOWN OF AURORA SEQR RESOLUTION 298 Ellicott Road (SBL#186.00-5-1) RESOLVED that the Town Board of the Town of Aurora declares itself lead agency with regard to SEQR for the Special Use Permit to expand campground operations at 298 Ellicott Road; and further RESOLVED that after considering the action stated herein, reviewing the criteria contained in Section 617.11 of the Rules and Regulations of the State Environmental Quality Review Act, the Code Enforcement Officer determines that the actions are Unlisted actions; and further RESOLVED that the Town Board of the Town of Aurora has determined that these Unlisted actions will result in no significant adverse impacts on the environment, and therefore, an environmental impact statement need not be prepared; and further RESOLVED that a negative declaration is issued with regard to the Special Use Permit to expand campground operations at 298 Ellicott Road, East Aurora, NY.

Page 15

4C.a TOWN OF AURORA RESOLUTION APPROVING SPECIAL USE PERMIT 298 Ellicott Road (SBL# 186.00-5-1) WHEREAS, Neil Hopkins/RNH 298 LLC has applied for a Special Use Permit for campground operations expansion at 298 Ellicott Road, East Aurora, NY; and WHEREAS, the Town Board of the Town of Aurora referred the Special Use Permit application to the Town of Aurora Planning Board for their review and recommendation; and WHEREAS, on May 6, 2026, the Planning Board voted unanimously to recommend that the Town Board approve the Special Use Permit; and WHEREAS, as an unlisted action under SEQR the Town Board found that the project will not result in any significant adverse environmental impacts. NOW, THEREFORE, BE IT RESOLVED, that pursuant to Town Code §95-2B(2) of the Town of Aurora, the Town Board of the Town of Aurora does hereby grant the attached Special Use Permit, including conditions, to Neil Hopkins/RNH 298 LLC to expand campground operations at 298 Ellicott Road, East Aurora, NY.

Page 16

OA June 24, 2026 To All Involved and Interested Agencies: Town of Aurora Erie County Department of Public Works Erie County Department of Health Erie County Water Authority NYS Department of Environmental Conservation NYS Department of Health NYS Department of Transportation NYS Environmental Facilities Corporation NYS Historic Preservation Office U.S. Army Corps of Engineers Re: Notice of Intent to Establish Lead Agency Village of East Aurora Water System Improvements Village of East Aurora, New York Dear Interested and Involved Agencies: Pursuant to the State Environmental Quality Review Act (“SEQRA”) and 6 NYCRR 617.6(b)(3)(i), please be advised that the Village of East Aurora intends to establish itself as Lead Agency for the purposes of fulfilling the SEQRA requirements relative to the proposed Village of East Aurora Water System Improvements Project. The Project will be located in the Village of East Aurora and Town of Aurora, Erie County, New York. The Village of East Aurora owns and operates a public water distribution system that serves residents and businesses throughout the Village. Portions of the existing water system do not meet current New York State Department of Health (NYSDOH) standards and have reached the end of their useful life, resulting in operational and maintenance challenges. The Village is proposing water system improvements to address identified deficiencies, improve system reliability, and bring the system into compliance with current NYSDOH standards. The proposed project includes the following components: e Approximately 37,000 linear feet of water main replacement with new 8-inch ductile iron water main Replacement of approximately 50 fire hydrants Replacement of approximately 70 gate valves Transfer of approximately 550 water services to the new water mains Rehabilitation of the existing water storage tanks located on Center Street and Castle Hill Road Replacement of the existing booster pump station on Elmwood Avenue with a new hydropneumatic system consisting of pumps, pressure tanks, controls, and associated appurtenances to improve system redundancy, water pressure, and fire flow capacity The experience to listen The power to 1738 Elmwood Avenue Suite 100, Buffalo, NY 14207 * Office: 315-457-5200 « Fax: 315-451-0052 « BartonandLoguidice.com solve ®eae

Page 17

Interested and Involved Agencies June 24, 2026 Page 2 Construction will occur primarily within existing roadway rights-of-way and at existing utility facilities throughout the Village of East Aurora. Enclosed for your review, as required pursuant to 6 NYCRR 617.6(b)(3)(i), is Part 1 of a completed Full Environmental Assessment Form (FEAF), that describes the proposed action in more detail, and a map detailing the project location and proposed infrastructure. The FEAF is complete with all information available at this time. If you are a representative of a state or local agency, your agency has been determined to meet the definition of an Interested or Involved Agency, as these terms are defined in 6 NYCRR Part 617.2. It is noted that additional entities (federal agencies involved with the project and the Village’s engineering consultant) are receiving copies of SEQRA correspondence for their files, although they do not meet the definition of Involved or Interested Agencies. In accordance with 6 NYCRR 617.6(b)(3), the intent of this letter is to initiate the coordinated review process. The Village is planning to complete their SEQR review for this project at a board meeting during the third week of July to meet the NYS Environmental Facilities Corporation Water Infrastructure Improvement Act (WIAA) Grant application deadline. To meet this schedule, Involved Agencies must agree upon Lead Agency designation by July 20, 2026. A Lead Agency consent form is provided at the end of this letter for your use. Please return this form as soon as possible. If you disagree with the proposed designation of the Village of East Aurora Village Board as Lead Agency for this project, or would otherwise like to provide comment, please send notice of said disagreement and/or comments to Hannah Buys at [email protected] or to the following address by July 20, 2026: Barton & Loguidice, D.P.C., 1738 Elmwood Avenue, Suite 100, Buffalo, NY 14207. Sincerely, BARTON & LOGUIDICE, D.P.C. Hannah Buys Environmental Scientist II Attachments: Lead Agency Consent Form FEAF Part 1 Figure 1. Proposed Water System Improvements 2126.002.003 SEQR Coordinated Review Letter

Page 18

SEQRA LEAD AGENCY DESIGNATION ACTION: Village of East Aurora Water System Improvements The undersigned involved or interested agency hereby: [_] Received the coordinated review package for the above-referenced action; AND CJ Consents; OR Cc Does not consent nation of the Villag to the desigae e of East A as Lead Agency for the above-referenced action. (Name of Involved or Interested Agency) (Printed Name of Representative) (Electronic/Digital Signature of Representative) Date Form must be received before the end of the coordinated review period: _ July 20, 2026

Page 19

Full Environmental Assessment Form Part I ~ Project and Setting Instructions for Completing Part 1 Part J is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification, Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies that would be necessary to update or fully develop that information, Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No.” If the answer to the initial question is “Yes,” complete the following sub-questions. If the answer to the initial question is “No,” proceed to the next question. Section F allows the project sponsor to identify and attach additional information. Section G requires the name and signature of the applicant or project sponsor to verify the information in Part | is accurate and complete. A. Project and Applicant/Sponsor Information. Name of Action or Project: Village of East Aurora Water System improvements Project Location (describe and attach a general location map): Village of East Aurora and Town of Aurora, Erie County, New York Brief Description of Proposed Action {include purpose or need): The Village of East Aurora owns and operates a public water distributlon system that serves residents and businesses throughout the Village. Portions of the existing water system do not meet current New York State Department of Health (NYSDOH) standards and have reached the end of their useful life, resulting in operational and maintenance challenges. The proposed project consists of Improvements to bring the system into compiiance with current NYSDOH standards and address ident!- fied deficiencies. Improvements Include replacement of approximately 37,000 linear feet of undersized water main with new 8-inch ductile iron water main, replace- ment of approximately 50 hydrants and 70 gate valves, transfer of approximately 550 water services to the new mains, rehabilitation of the existing water storage tanks on Center Street and Castle Hill Road, and replacement of the existing booster pump station on Elmwood Avenue with a new hydropneumatic system to im- prove system redundancy, water pressure, and fire flow capacity. Construction will occur primarily within existing roadway rights-of-way and at existing utillty faclli- tles. Name of Applicant/Sponsor: Telephone: 746-388-1605 Village of East Aurora, C/O Luke Wochensky, Mayor E-Mail: [email protected] Address: 95 Oakwood Avenue City/PO: East Aurora, NY State: yy Zip Code: Project Contact (if not same as sponsor; give name and title/role): Telephone: 595-325-7190 ext 2222 Hannah Buys, Environmental Scientist i, Barton & Loguidice, D,P.C. E-Mail: [email protected] Address: 4738 Elmwood Avenue, Suile 100 City/PO: State: Zip Code: Buffato NY 44207 Property Owner (if not same as sponsor): Telephone: Proposed water main and hydrant replacements wil occur within existing municipal roads. Storage tanks and boasler pump * statlon are located on property ovmed by the Village. E-Mail: Address: City/PO: State: Zip Code: Page | of 15 FEAF 2026

Page 20

B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approvals) Application Date Required (Actual or projected) a. City Council, Town Board, Yesi_] No Village of East Aurora (Project Sponsor) Summer 2026 or Village Board of Trustees b. City, Town or Village LJYes[X] No Planning Board or Commission c, City, Town or CJ Yes[X]No Village Zoning Board of Appeals d. Other focal agencies C1 ¥es[X]No , 9 Erle County Highway Deparment i En e. County agencies [x1Yesi_]No County Devartiento Hoalth (epee) “ Summer/Fall 2026 f, Regional agencies [VYes{X] No g. State agencies [X} Yes{_INo NYSDEC, NYSDOH, NYSDOT, NYSOPRHP: Permitsfapprovats; | gummerial 2028 h. Federal agencies Yes[_}No USACE (penmit) SummerFall 2026 i. Coastal Resources. i. Is the project site within a Coastal Area or the waterfront area of a Designated Inland Waterway? [Yes KXINo ii. Is the project site located in a community with an approved Locai Waterfront Revitalization Program? [7 Yes KXINo iif, Is the project site within a Coastal Erosion Hazard Area? [I] Yes[X] No C, Planning and Zoning C.1. Planning and zoning actions. Will administrative or legislative adoption, or amendment ofa plan, local Jaw, ordinance, rule, or regulation be the (2) Yes{X] No only approval(s) that must be granted to enable the proposed action to proceed? ¢ if Yes, complete sections C, F and G, ¢ IfNo, proceed to question C,2 and complete all remaining sections and questions in Part | C.2, Adopted land use plans. a, Do any municipaily adopted (city, town, village, or county) comprehensive land use plan(s) include the site KiyesCINo where the proposed action would be located? If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action ryYes EX] No would be located? b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; [Kl Yes (-] No Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; or other?) If Yes, identify the plan(s): NYS Heritage Areas: West Erie Canal Corridor c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan Dd Yes[]No or an adopted municipal farmland protection plan? Lf Yes, identify the plan{s): ise en Farmland Protection Plan Page 2 of 15 FEAE 2026

Page 21

d. Is the proposed action in a municipality with an adopted comprehensive or individual plan that addresses climate x] Yes [No change? Erie Counly HMP (2022)- Village of East Aurora Jurisdictional Annex If yes , identify the elements of the plan that are relevant to the action: Erie County Hazard Mitigation Plan (2022 Update), Relevant elements include mitigation of flooding, severe storms, extreme precipitation avents, infrastructure resilience, protection of public water supply infrastructure, and emergency preparedness for climate-related hazards. C3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. Kl Yes C1 No if Yes, what is the zoning classification(s) including any applicable overlay district? SFR- Single-Family Residential, GR- Genera! Residential, VC- Village Center, NC- Neighborhood Commercial, LCR- Limited Commercial Residential, OS- Open Space b. Is the use permitted or allowed by a special or conditional use permit? Cj Yes{k] No c. Is a zoning change requested as part of the proposed. action? [VYes [KXJNo If Yes, What is the proposed new zoning for the site? C.4, Existing community services. a. In what school district is the project site located? East Aurora Union Free School District b, What police or other public protection forces serve the project site? East Aurora Police Department, Erie County Sheriff's Office, NYS Police Troop A c. Which fire protection and emergency medical services serve the project site? East Aurora Fire Department d. What parks serve the project site? Majors Park, Knox Farm State Park, Sinking Pond Wildlife Sanctuary, The Owens Falls Sanctuary, Harlin Park D. Project Details D.1, Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include allcomponents)? — Municipal water system Improvements- water main replacement, tank recoating, new booster pump station b. a. Total acreage of the site of the proposed action? 40.8 acres b. Total acreage to be physically disturbed? 9 acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? 32.4 acres c. Is the proposed action an expansion of an existing project or use? (] Yes[k] No i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (¢.g., acres, miles, housing units,square feet)? % . Units: d, Is the proposed action a subdivision, of does it include a subdivision? LJ Yes [XINo if Yes, i, Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ii Is a cluster/conservation layout proposed? [] Yes (JNo tii, Number of lots proposed? iv. Minimum and maximum proposed lot sizes? Minimum Maximum Page 3 of 15 FEAF 2026

Page 22

e, Will the proposed action be constructed in multiple phases? [] Yes [Xi No i, If No, anticipated period of construction: 12_ months ii, Tf Yes: * Total number of phases anticipated ¢ Anticipated commencement date of phase | (including demolition) month year « Anticipated completion date of final phase month year e Generally describe connections or relationships among phases, including any contingencies where progress of one phase maydetermine timing or duration of future phases: f. Does the project include new residential uses? [1] Yes [X] No If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family (four or more) Initial Phase At compietion ofall phases g. Does the proposed action include new non-residential construction (including expansions)? 1 Yes (] No If Yes, i. Total number of structures _4 (replacement booster pump structure) ii, Dimensions (in feet) of largest proposed structure: ? height; © width; and__7 length (approx.50sf) iii. Approximate extent of building space to be heated or cooled: _ twa space wil not be heated or cooled square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any [Ves KiNo liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i, Purpose of the impoundment: ii. (fa water impoundment, the principal source of the water: [J Ground water [Surface water streams [] Other specify: iif, Lf other than water, identify the type of impounded/contained liquids and their source. iv. Approximate size of the proposed impoundment. Volume: million gallons; surface area: acres y, Dimensions of the proposed dam or impounding structure: height; length vi, Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): D.2. Project Operations a, Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? [ ]¥es [X]No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i. What is the purpose of the excavation or dredging? ii, How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site? * Volume (specify tons or cubic yards): © Over what duration of time? iti, Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. iy, Will there be onsite dewatering or processing of excavated materials? [] Yes{_]No If yes, describe. y. What is the total area to be dredged or excavated? acres vi, What is the maximum area to be worked at any one time? acres vil. What would be the maximum depth of excavation or dredging? feet viii. Will the excavation require blasting? [Yes []No ix. Summarize site reclamation goals and plan: Page 4 of 15 FEAF 2026

Page 23

b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes | No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): NYSDEC Wetland EA-8, multiple wetlands mapped by the United States Fish and Wildlife Service (USWES) National inventory (NWI), Tannery Brook and tribs, East Branch Cazenovia Creek and tribs ii. Describe how the proposed action would affect that waterbody or wetland, e.g., excavation, fill, placement of structures, or alteration of channels, banks, and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: If new water main crosses wetlands or surface waters and open cut installation is required, temporary disturbances would result. Ail resources would be restored {o their pre-construction grades and cover types once Installation is complete. Specific impacts will be determined during the project's tinal design phase: iii, Will the proposed action cause or result in disturbance to bottom sediments? [X] Yes [-JNo If Yes 5 describe: Ternporary disturbance fo boltom sediments may occur Hf open-cut installation ls required at steam crossings. Any disturbad straambed araas would be restored following construction. iv, Will the proposed action cause or result in the destruction or removal of aquatic vegetation? [1 Yes X]No If Yes: * acres of aquatic vegetation proposed to be removed: _ expected acreage of aquatic vegetation remaining after project completion: e purpose of proposed removal (e.g. beach clearing, invasive species contro], boat access): ® proposed method of plant removal: e if chemical/herbicide treatment will be used, specify product(s): y. Describe any proposed reclamation/mitigation following disturbance: Temporarily disturbed wetlands and surface waters will be restored and stabilized to their original grades following construction. c, Will the proposed action use, or create a new demand for water? xl Yes LINo If Yes: i, Total anticipated water usage/demand per day: 786,000 (max daily flow) gallons/day Existing system demand. No proposed change, i, Will the proposed action obtain water from an existing public water supply? Yes LJNo If Yes: * Name of district or service area: _ Village of East Aurora Water District/Erie County Water Authority * Does the existing public water supply have capacily to serve the proposal? Yes] No e Is the project site in the existing district? [X] Yes [7] No e is expansion of the district needed? r1Yes KX] No * Do existing lines serve the project site? K] Yes] No iii, Will line extension within an existing district be necessary to supply the project? TYes [Xx] No if Yes: « Describe extensions or capacity expansions proposed to serve this project: ¢ Source(s) of supply for the district: iy. Ts a new water supply district or service area proposed to be formed to serve the project site? [Yes KiNo If Yes: e Applicant/sponsor for new district: * Date application submitted or anticipated: « Proposed source(s) of supply for new district: vy. Ifa public water supply will not be used, describe plans to provide water supply for the project: vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: gallons/minute. Page 5 of 15 FEAF 2006

Page 24

d, Will the proposed action generate liquid wastes? F-1 Yes [JNo If Yes: i, Total anticipated liquid waste generation per day: gallons/day ii, Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): iti, Will the proposed action use any existing public wastewater treatment facilities? Cl¥es (1INo Uf Yes: e Name of wastewater treatment plant to be used: Name of district: e Does the existing wastewater treatment plant have capacity to serve the project? Ll¥es [No e Is the project site in the existing district? (Yes [JNo e Is expansion of the district needed? [ves [No e Do existing sewer lines serve the project site? ["TYes [No e Willa line extension within an existing district be necessary to serve the project? [TYes CJNo If Yes: « Describe extensions or capacity expansions proposed to serve this project: iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? [JYes [JNo If Yes: « Applicant/sponsor for new district: * Date application submitted or anticipated: ° What is the receiving water for the wastewater discharge? y. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture, recycle or reuse liquid waste: e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point [x]Yes [No sources (i.e, ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.¢., sheet flow) during construction or post construction? If Yes: i, How much impervious surface will the project create in relation to total size of project parcel? Square feetor__9 _ acres (impervious su rface) (replacement booster pump station building will be located al the existing booster pump station site, No a 40.8 . : . nel Increase in impervious surface area is anUcipated) Square feet or_40.8 acres (parcel size) ii, Describe types of new point sources. construction iii. Where will the stormwater runoff be directed (i.¢. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water, or off-site surface waters)? Existing drainage features, Including roadside drainage and on-site surface waters « Ifto surface waters, identify receiving water bodies or wetlands: Tannery Brook and tibs, East Branch Cazenovia Creek and tribs ¢ Will stormwater runoff flow to adjacent properties? [Yes (_JNo iv, Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? [JYes [X]No Page 6 of 15 FEAF 2026

Page 25

f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel [X]Yes [[INo combustion, waste incineration, or other processes or operations? If Yes, identify: i, Mobile sources during project operations (¢.g., heavy equipment, fleet or delivery vehicles) Heavy equipment during construction. No sources of air emissions as part of system operations post-construction ii, Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ili. Stationary sources during operations (e.g., process emissions, boilers, elecitic generation, surface coating) g. Will any air emission sources named in D.2.f (above), require an Air Facility Registration, Air State Facility E]Yes K]No Permit, Title T1V Permit or Title V Permit? If Yes: i. Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration requirements discussed in 6 NYCRR Part 23 £? [les [[JNo ii, As calculated in the air permit application, the proposed action has the potential to emit: e Tons/year (short tons} of carbon monoxide (CO) Tons/year (short tons) of oxides of nitrogen (NOx) # Tons/year (short tons) of particulate matter (PM-10, PM-2.5} 8 Tons/year (short tons) of volatile organic compounds (VOC) * Tons/year (short tons) of sulfur dioxide (SO2) s iii, Will emissions of air contaminants from the proposed action described above exceed the corresponding major ["]Yes [JNo source thresholds? iv. Does the proposed action have the potential to emit 10 tons/year or more of any one designated hazardous air [TYes [INo pollutant or 25 tons/year or more of any combination of such hazardous air pollutants (6 NYCRR 200.1 (ag))? If Yes, provide the total potential to emit hazardous air pollutants in short tons/year: h. Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions, such as carbon dioxide, methane, nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxide equivalents per year at any point in the lifetime of the proposed action (estimated using the carbon dioxide equivalent definition and global warming potentials provided in 6 NYCRR Part 496)? . [] Yes jX] No If Yes: i. Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric): ii, Describe any greenhouse gas capture, control, or elimination measures included in project design: i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as [_] Yes [kJNo quarry or landfill operations? If Yes: Describe ‘operations and nature of emissions (e. Bo, diesel exhaust, rock particulatesidust). | j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial [Yes K}No new demand for transportation facilities or services?’ If Yes: i, When is the peak traffic expected (Check all that apply): _[-] Morning "Evening [ ] Weekend Randomly between hours of. to ii, For commercial activities only, projected number of truck ttips/day and type (e.g., semi trailers and dump trucks): iii, Parking spaces: —_ Existing Proposed Net increase/decrease iv. Does the proposed action include any shared use parking?’ [] Yes([]No v, Ifthe proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: vi, Are public/private transportation service(s) or facilities available within 4 mile of the proposed site? []Yes[ JNo vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric = []Yes[JNo or other alternative fueled vehicles? viii, Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing [_|¥es fJNo pedestrian or bicycle routes? : Page 7 of 15 FEAF 2026

Page 26

k. Wil the proposed action (for commercial or industrial projects only) generate new or additional energy demand? [Yes |_|No If Yes: N/A- not a commercial/industrial project i, Estimate annual electricity demand during operation of the proposed action: ii. Anticipated sources/suppliers of electricity for the project (e.g., on-sile combustion, on-site renewable, via grid/local utility, or other): iff. Will the proposed action require a new, or an upgrade, to an existing substation? [lYes [No |. Hours of operation. Answer ail items which apply. i, During Construction: ii, During Operations: * Monday - Friday: _7AM-5PM e Monday - Friday: Continuous use of water system e Saturday: NIA e Saturday: Continuous use of waler syslem e Sunday: NIA e Sunday: Continuous use of water system ¢ Holidays: NIA ¢ Holidays: Continuous use of water system m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes [No operation, or both? If yes: i, Provide details including sources, time of day and duration: Ambient nolse levels would likely be exceeded during construction. Construction activities would be completed during daytime, weakday work hours (generally 7AM to 5PM). Operational noise levels at the booster pump station are not expected tc be audible from nearby developed properties. ii, Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? Yes LINo Describe: Tree clearing may be required to facilitate construction. All clearing will be restricted to the smallest footprint required, n. Will the proposed action have outdoor lighting? [x] Yes []No If yes: i, Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: New exterior lighting would be installed for the booster pump station upgrades. New lighting would aim downward, and would be mounted approx. 5 feet high off ihe ground. The nearest occupied structures are approximately 100 feet east and west of the proposed light. ii, Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes [No Describe: Tree clearing may be required to facilitate construction, All clearing will be restricted to the smallest footprint required. o. Does the proposed action have the potential to produce odors for more than one hour per day? [Yes KINo If Yes, describe possible sources, potential frequency and duration of odor emissions, atid proximity to nearest occupied structures: p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) [lYes KINo or chemical products [85 gallons in above ground storage or any amount in underground storage? If Yes: i, Product(s) to be stored if, Volume(s) per nnit time (e.g., month, year) iii. Generally, describe the proposed storage facilities: q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (ie,, herbicides, L] YesL]No insecticides) during construction or operation? If Yes: ; Vind ; : escr} proposed treatment(s): NIA- not not a commercialfindustrial project i. Describe ii, Will the proposed action use Integrated Pest Management Practices? ' L] Yes (JNo Page 8 of 15 FEAF 2006

Page 27

r, Will the proposed action (commercial or industrial projects only) involve or require the management or disposal — [_]Yes[_]No of solid waste (excluding hazardous materials)? If Yes:‘ a . . . see N/A- not a commerciaifindusitial project i, Describe any solid waste(s) to be generated during construction or operation of the facility: Pro) e §=©Construction: fons per. (unit of time) e «Operation ; tons per (unit of time) ii. Describe any proposals for on-sife minimization, recycling or reuse of materials to avoid disposal as solid waste: » Construction: « Operation: iii. Proposed disposal methods/facilities for solid waste generated on-site: « Construction: e Operation: s. Does the proposed action include construction or modification of a solid waste management facility? [1 Yes {X] No If Yes: i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or other disposal activities): i7, Anticipated rate of disposal/processing: e Tons/month, if transfer or other non-combustion/thermal treatment, or e Tons/hour, if combustion or thermal treatment iii, Lf landfill, anticipated site life: years t, Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous [_]Yes X]No waste? Hf Yes: i. Name(s) of all hazardous wastes or constituents to be generated, handled, or managed at facility: ii, Generally describe processes or activities involving hazardous wastes ar constituents: iti, Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization, recycling, or reuse of hazardous constituents: y. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? ClYes LINo If Yes: provide name and location of facility: If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: Page 9 of 15 FEAF 2026

Page 28

EK, Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a. Existing land uses. i, Check all uses that occur on, adjoining and near the project site. (Urban =] Industrial Commercial [] Residential (suburban) [[] Rural (non-farm) Forest [1 Agriculture [kX] Aquatic [] Other (specify): i, If mix of uses, generally describe: The project area consists of the Village of East Aurora, Developed properties in the project area generally consist of residential and commercial use. Any vacant land consists of forest cover or open water. b. Land uses and cover types on the praject site. Land use or Current Acreage After Change Cover type Acreage Project Completion (Acres t/-) * Roads, buildings, and other paved or impervious surfaces (total) | 9 (total) (ictal 9.003 (total) +,003 (total) * Industrial or manufacturing 0 0 0 ¢ Commercial 0 0 0 + Residential 9 9,003 +,003 * Forested 5 4.5 -0.5 ¢. Meadows, . grasslands . . or brushlands (non- ; 3 3 0 agricultural, including abandoned agricultural) e Agricultural 0 0 0 (includes active orchards, field, greenhouse, etc.) ° Surface water features 05 08 0 (lakes, ponds, streams, rivers, etc.) ¢ Wetlands (freshwater or tidal) 3 3 0 e Non-vegetated (bare rack, earth, or fit) 0 0 0 ® Other, Describe: Mowed/maintained herbaceous cover 20 20.49 40.49 Page 10 of 15 FEAF 2026

Page 29

¢. Is the project site presently used by members of the community for public recreation? X} Yes _]No i If Yes: explain; Streams within the project area may be used for fishing. d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed Yes [_JNo day care centers, or group homes) within [500 feet of the project site? if Yes, i, Identify facilities: East Aurora Union Free District School, East Aurora Pre School Center, Duck Duck Goose Child Care Center, Absolut Care of Aurora Park, and First Presbyterian Preschool are within 1500 feet of the project site e. Does the project site contain an existing dam? , [1 Yes {xX]No If Yes: i, Dimensions of the dam and impoundment: « Datn height: feet e Dam length: feet e Surface area: acres ¢ Volume impounded: gallons OR acre-feet ii. Dam’s existing hazard classification: iii, Provide date and summarize results of last inspection: f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, L] Yes [X]No or does the project site adjoin property that is now, or was at one time, used as a solid waste management facility? If Yes: i. Has the facility been formally closed? LC] Yes FINo e If Yes, cite sources/documentation: ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: ifi. Describe any development constraints due to the prior solid waste activities: g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin CJ Yes EXINo property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: i, Déseribe waste(s) handled and waste management activities, including approximate time when activities occurred: h, Potential contamination history. Has there been a reported spill at the proposed project site, or have any Kj Yes L] No remedial actions been conducted at or adjacent to the proposed site? If Yes: i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site KX] Yes (] No Remediation database? Check all that apply: Yes — Spills Incidents database Provide DEC ID number(s); _ 2508380, 2504674 [] Yes— Environmental Site Remediation database Provide DEC ID number(s): [] Neither database ii. If site has been subject of RCRA corrective activities, describe contro! measures: iii, Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? Yes LINo If Yes, provide DEC ID number(s): _ 945157 iv. If Yes to (i), (i) or Git) above, describe current status of site(s): All spill records have been closed out. Remediation at the sile has been completed, Page II of 15 FEAF 2026

Page 30

v. Is the project site subject to an institutional control limiting property uses? [VY es[XiNo If Yes, DEC site ID number: Describe the type of institutional control (e.g., deed restriction or easement): @ oe 8 Describe any use limitations: Describe any engineering controls: 8* Will the project affect the institutional or engineering controls in place? PTYesINo Explain: E.2, Natural Resources On or Near Project Site a, What is the average depth to bedrock on the project site? >6 feet b, Are there bedrock outcroppings on the project site? L}Yedx]No If Yes, what proportion of the site is comprised of bedrock outcroppings? % ¢, Predominant soil type(s) present on project site: Palmyra gravelly loam, 0 to 3 percent slopes 23.3 % Phelps gravelly loam, 0 to 3 percent slopes 18.1 % Varysburg gravelly loam, 0 io 3 percent slopes 172° % *41.4% of the site is made up of other soll classifications d. What is the average depth to the water table on the project site? Average: 2 feet e, Drainage status of project site soils; © Well Drained: 49.3 % of site Moderately Well Drained: 18.2 % of site Poorly Drained 32.5 % of site f. Approximate proportion of proposed action site with slopes: — 0-10%: 85,6 _% of site 10-15%: 8.8 %ofsite 15% or greater: 46 %of site g. Are there any unique geologic features on the project site? L_lYes[X]JNo If Yes, describe: h. Surface water features. i, Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, [XT ¥es[JNo ponds, or lakes)? ii, Do any wetlands or other waterbodies adjoin the project site? x} Yes{_]No If Yea to either j or i/, continue, Ef No, skip to E,2.4. iii, Ave any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, [x}Yes[_INo state or local agency? iv, For each identified regulated wetland and waterbody on the project site, provide the following information: « Streams: Nate Tannery Brook and tribs; East Branch of Cazenovia Creek and iribs Classification _ Portions of Tribs are C/C and B/B * Lakes or Ponds: Name_None Classification N/A * Wetlands: Namie NYSDEC Wetland EA-8; multiple NWI wetlands Approximate Size _Approx. 3 acres * Wetland No. (if regulated by DEC) y. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired TYes[X]No waterbodies? | If Yes, name of impaired water body/bodies and basis for listing as impaired: i. Is the project site in a designated Floodway? X] Yes [_No j. Is the project site in the 100-year Floodplain? [X] Yes [No k. Is the project site in the $00-year Floodplain? kX} Yes [1] No fe Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? [X] Yes [—INo If Yes: i, Name of aquifer: Principal aquifer Page 12 of 15 FEAF 2026

Page 31

m. Identify the predominant wildlife species that occupy or use the project site: White-tailed deer White-footed mouse Gray squirrel Eastern cottontall Raccoon Striped skunk Muttiple bird species Multiple fish/amphibian species 11. Does the project site contain a designated significant natural community? [1 Yes [x]No If Yes: i, Describe the habitat/community (composition, function, and basis for designation): ii, Source(s) of description or evaluation: ili, Extent of community/habitat: ¢ Currently: acres ¢ =©Following completion of project as proposed: acres e Gain or loss (indicate + or -): acres a, Does project site contain any species of plant or animal that is listed by the federal government or NYS as Yes[_}No endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? If Yes: i. Species and listing (endangered or threatened): (Danaus plexippus, proposed threatened) p. Does the project site contain any species of plant or animal! that is listed by NYS as rare, or as a species of [| Yes {x]No special concern? If Yes: i. Species and listing: q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? [X] Yes [[]No If Yes, give a brief description of how the proposed action may affect that use: Tributaries may be used for fishing. Temporary disturbance associated with construction, may result in short-term impacts. All areas will be rastored following construction, and these resources will remain available, E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to [_] Yes [X]No Agriculture and Markets Law, Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: b, Are agricultural lands consisting of highly productive soils present? (Yes [X]No i, If Yes: acreage(s) on project site? ii, Source(s) of soil rating(s): c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National L] Yes [X]No Natural Landmark? If Yes: i. Nature of the natural landmark: L_] Biological Community [} Geological Feature ii, Provide brief description of landmark, including values behind designation and approximate size/extent: d.Is the praject site located in or does it adjoin a state listed Critical Environmental Area? [ ] Yes [X] No If Yes: i. CEA name: ii. Basis for designation: iii, Designating agency and date: Page 13 of [5 FEAF 2026

Page 32

e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district [x] Yes [[JNo listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYSOffice of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes: i, Nature of historic/archacological resource: [_} Archaeological Site Historic Building or District ii. Name: _Multipfe homes and buildings throughout the Village of East Aurora iii. Brief description of attributes on which listing is based: Buildings fisted on National Reglster of Historic Places f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for Yes [JNo archaeological sites on the New York State Historic Preservation Office (SHPO) archaeological site inventory? g. Have additional archaeological or historic site(s) or resources been identified on the project site? LlYes KINo If Yes: i, Describe possible resources): ii, Basis for identification: h, Is the project site within five miles of any officially designated and publicly accessible federal, state, or local Xl Yes LINo scenic, or aesthetic resource? If Yes: ; _ i, Identify resource: Majors Park, Knox Farm State Park, Sinking Pond Wildlife Sanctuary, The Owens Falls Sanctuary, Hamiin Park ii, Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic tratl, or scenic byway, etc.): __ Public village parks. state parks, and local wildlife sanctuaries fii, Distance between project and resource: 0-5 miles, i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers L}Yes K]No Program 6 NYCRR 666? If Yes: i, Identify the name of the river and its designation: it, Is the activity consistent with development restrictions contained in GNYCRR Part 6662 Yes No L.4. Disadvantaged Communities Designated Pursuant to ECL Article 75 a. Is the project located within, or within 4-mile of, a disadvantaged community? [iYes [X]No IfNo, could impacts (see examples below in E,4.b) from the project affect a disadvantaged community? Llyes [X]No If Yes to either question in E.4.a, answer the remaining questions in this section. b. Will there be direct or indirect impacts that may affect a disadvantaged community, such as those listed below? LJ] Yes []No j. new noise sources or expansions/modification of existing noise sources; - noise from operational sources - noise from construction activities ii, emissions of air pollutants, including mobile emissions; iii, wastewater discharges; iv. generation of odors; v. light pollution; vi. new or modified radiation sources; vii. new or modified sources of solid waste generation, management, or disposal. If Yes, describe the impacts: c. Do any of the state agency approvals identified in question B.g include any of the following DEC permits? State Pollutant Discharge EHmination System (SPDES) 1 Yes [-] No Solid Waste Management Facility [lyes [INo Hazardous Waste Management Facility C] Yes [| No Air Pollution Control (Title V or Air State Facility) [| Yes L1No Water Withdrawal over 20 MGD for Cooling Water Cl Yes [-}No Waste Transporter L]Yes [JNo Page 14 of 15 FEAF 2026

Page 33

E.5 Fature Physical Climate Risks Will the proposed action be vulnerable to the following future physical climate risks under current or projected future conditions: a. Is the proposed action vulnerable to damage from a projected 100-year flood? [] Yes No b. Is the proposed action vulnerable to damage from a projected 500-year flood? []¥es [kK] No ¢, Is the proposed action in an area potentially affected by sea level rise? [J}¥es [x] No d. Will the proposed action increase the vulnerability of human or ecological communities to the following: i, drought? E]Y¥es [X]No ii, temperature extremes (hot or cold)? [] Yes [XINo iii, extreme storms, including high winds? [J] Yes []No iv. landslides? []¥es [K]No v, coastal erosion? [} Yes [x]No vi, stormwater flooding? L] Yes No vii, other climate or weather hazards? L_] Yes No. If Yes, describe: F, Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name_Village of East Aurora- Luke Wochensky Date _ 98-15-2026 Signature <O "Title Village Mayor \a PRINT FORM Page 15 of 15 FEAF 2026

Page 34

AN 9Z0z aunt Aquno> ey 399} 008") = YOU | USsWdAOIdWT Wa sAS 1032, posodoid ainBly eioiny Jseyq jo abeljin syuel sbesojs uoyels dung Jejsoog jugueoR|dey ule Jo}eAA\ posodold Asepunog abe], [| pusbe7y

Page 35

NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION 56 Division of Lands and Forests, Forest Health 21 South Putt Corners Road, New Paltz, NY 12561-1620 P: (845) 256-3111 | F: (845) 255-3414 | [email protected] www.dec.ny.gov Giant Hogweed Control Summary Site#: 2772 Site Address: 441 Olean Road (Majors Park) Visit Date: 6/9 6/10 & i If checked, all control work for this year has been completed. 6/15/2026 L] If checked, Giant Hogweed was controlled with an herbicide. it checked, Giant Hogweed was controlled by root-cutting: 474 plants. LI If checked, Giant Hogweed flower/seed heads were cut and bagged: plants. LJ lf checked, no Giant Hogweed was found (monitoring will occur for at least 3 years). LI If checked, this is the CJ third or LJ sixth year of monitoring, with no plants found. This site is considered eradicated, but as an extra precaution, we plan to visit again in 3 years. Since we do not plan to visit during the next 2 years, contact us if you notice any Giant Hogweed during this time. LI] Congratulations! Your site has had no Giant Hogweed plants for nine or more years. DEC crews will no longer be visiting. Please contact us if you notice any Giant Hogweed in the future. Additional Giant Hogweed Information: e Donot touch Hogweed, dead or alive, with your bare skin. Before approaching it, read the Giant Hogweed Control Methods Guide, especially the section titled Public Health Hazards & Safety Instructions. Copies are available from your crew or at https://dec.ny.gov/nature/animals-fish-plants/plants/harmful-plants/giant-hogweed. e Controlled (killed) plants are left to decompose where the work was performed and, especially at large sites, some plants may survive control efforts. Be mindful of this when you are in or around those parts of your property. e Crews may not have controlled flowering plants other than by removing their seed heads. This is because once a Giant Hogweed plant produces seed, it dies (root and all) later that year. e If herbicide was applied, do not enter the sprayed area for at least 24 hours. If pesticide signs were placed onsite, do not remove the signs for at least 24 hours. Each sign shows the date and time of application. e Ifa property access form accompanies this letter, complete the form and return it in the pre-addressed envelope. e Asite needs to be monitored for 3 consecutive years, without finding plants, before it is considered eradicated. e The following statement only pertains to small sites. If possible, visit the site repeatedly over the coming months and report any flowering plants. (518) 320-5033 Contact Information for your Giant Hogweed crew: Diana Chaburka ([email protected]) NYSDEC Giant Hogweed Program Coordinator: Naja Kraus (845-256-3111, [email protected]) Please contact your crew and/or Naja with comments, questions and concerns. NEW YORK STATE OF Department of OPPORTUNITY Environmental Conservation

Page 36

Giant Hogweed 2026 Map Majors Park Boucher, Joel = = Gues Susan D. oo DiFilippo, DouglasA = Kubiak, Michael. Patterson, DouglasC a | Bolster, Suzannecom. M : Sultana, Adrian. Town of Aurora Tow of Aurora . 6/9/2026 GH_Site_Survey GH_Polygon_2022 @ Not Visited GH_Polygon_2021 GH_AIL Site_Info_051926 “3 GH_Polygon_2020 GH Presence Points 2025 || GH_Polygon_2018 Treatment Physical = GH_Polygon_2017 Presence Points ', = 5 Town_or_City_boundary Contributing counties, NYS Office of Information Technology Services Presence Polygons " ’ NY County Boundaries Geospatial Services and NYS Department of Taxation and Finance's Office of — Parcels_w_hogweed_sites_and_adjacent High Resolution 60cm Imagery Real Property Tax Services (ORPTS)., New York State, Vantor GH_Polygon_2024 High Resolution 30cm Imagery GH_Polygon_2023 Citations

Page 37

wee eeeee nnn n enn ee | COUNTY: By, ro stot RE a a me ae a a ey et Sh eh nS! tt? GO Gah OK Sef tt sm seb Se hm dD up th Sp wow nea ae LICENSE TO ENTER PROPERTY FOR GIANT HOGWEED CONTROL PROGRAM | FOREST HEALTH NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Giant Hogweed is a Federal Noxious Weed which spreads quickly and has the potential to cause severe skin irritations. Giant Hogweed infestations have been documented in your area. It is essential we gain total contro] over this potential health threat before it spreads to other properties or areas of the state. This control program is a joint effort between the New York State DEPARTMENT OF ENVIRONMENTAL CONSERVATION (NYSDEC) and the PROPERTY OWNER, identified herein. I, the PROPERTY OWNER of the property identified herein, grant a right of access to the NYSDEC, ITS REPRESENTATIVES, MUNICIPAL AGENCIES AND OTHER ORGANIZATIONS to enter my property in order to monitor for Giant Hogweed plants or exercise a control program over any Giant Hogweed infestation area(s) of my property. The control program may include one or more of the following control methods: cutting through the root of the plant, removing the umbels (flower heads); and/or the proper applications of herbicides . I understand that the control program will not include removal of the Giant Hogweed plant material from my property. With respect to allowing employees of the NYSDEC upon the properties listed below (“premises”), the NYSDEC hereby agrees that, in-consideration of the privilege of entering upon the premises for the purpose of control ling Giant Hogweed, the NYSDEC will release, indemnify, protect and save harmless the landowner, to the extent authorized by state law, ' particularly the Court of Claims Act and shall be responsible for any final judgment of'a court of competent jurisdiction which is based upon the NYSDECs negligence-or the negligence of its employees, while acting within the course and scope of their employment. In accordance with State Finance Law § 41, said responsibility of the NYSDEC is limited to the availability of lawful appropriations. And it is further understood and agreed that in performan ce of the aforesaid entry upon the premises, the NYSDEC is an independent contractor, and its servants, and employees shal] at no time considered employees of the landowner. The NYSDEC shall leave the premises in the be same condition as found notwithstanding reasonable wear and tear resulting from the conduct of Giant Hogweed control. The NYSDEC is ‘working to protect and conserve the natural areas within our state. [ understand that there will be no cost to the property owner for this service which I] am allowing in order to support the effort of controlling the spread of Giant Hogweed. PRINT NAME OF PROPERTY OWNER(S): _“7owy) of AueoeA Address of Property | STREET: G4) OLGA RD. CITY, STATE: _ RT Avitoe4 Crounor puceen) a4 zip: /Y¥OS 2 Mailing Address of | STREET: 300 GLEED Pe. Owner if different _ ag . | than above address | CITY, STATE: _GST_ Any2orev+ DA 7. ZipiYor! TELEPHONE: DAY (Jile) @S2-"7590 EVENING (7&@ ) &G 7-0 290 EMAIL ADDRESS: _Supeevison(@ Lownefaurera, cam SPECIAL NEEDS: SIGNATYRE OF PROPE ppt? a. PO , Towa) SuPGeViSoR DATE: _ 9° 9-/79 SIGNATURE OF RE PRESENTATIVE OF THE GIANT HOGWEED PROGRAM: _ DATE: SLIA/I7 -

Page 38

SS eth sre mes abe i en ams va, ee) EY) SS: me USN es sine ara ey te i a eC 2 = see ee sa ee im me gk er em EK th hE SOUNTY: Evie One AMES cee Rh mate art ath Sh ih ine on eh ip Some. suo on, wae ca aS a mee NYSDEC Site #: 1 77: LICENSE TO ENTER PROPERTY FOR GIANT HOGWEED CONTROL PROGRAM FOREST HEALTH NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CON SERVATION Giant Hogweed is a Federal Noxious Weed which Spreads quickly and has the potential to cause severe skin irritations. Giant Hogweed infestations have been documented in your area, It is essential we gain total control health threat before it spreads to other properties or areas of the state. This control over this potential program is a joint effort between the New York State DEPARTMENT OF ENVIRONMENTAL CONSERVATI ON (NYSDEC) and the PROPERTY OWNER, identified herein. I, the PROPERTY OWNER of the property identified herein, grant a right of access to REPRESENTATIVES, MUNICIPAL AGENCIES AND OTHER ORGANIZATIONS the NYSDEC, ITS to enter my property in order to monitor for Giant Hogweed plants or exercise a contro] program over any Giant Hogweed infestation area(s) of my property. The control program may include one or more of the following control methods: cutting through the root of the plant, removing the umbels (flower heads): and/or the proper applicatio ns of herbicides. | understand that the control program will not include removal of the Giant Hogweed plant material from my property. With respect to allowing employees of the NYSDEC upon the properties listed below (“premises”), the NYSDEC hereby agrees that, in consideration of the privilege of entering upon the premises for the purpose of control the NYSDEC ling Giant Hogweed, will release, indemnify, protect-and save harmless the landowner, to the extent authorized by state law, particularly the Court of Claims Act and shall be responsible for any final judgment of'a court of competent jurisdiction which is based upon the NYSDECs negligence or the negligence of its employees , while acting within the course and scope of their employmen t. In accordance with State Finance Law § 41, said responsibility of the NYSDEC is limited to the availability of lawful appropriations. And it is further understood and agreed that in performance of the aforesaid entry upon the premises, the NYSDEC is an independent contractor, and its servants, and employees shall at no time be considered employees of the landowner. The NYSDEC shall leave the premises in the same condition as found notwithstanding reasonable wear and tear resulting from the conduct of Giant Hogweed control. The NYSDEC is working to protect and conserve the natural areas within our state. | understand that there will be no cost to_ the property owner for this service which I am allowing in order to supporthe t effort of controlling the spread of Giant Hogweed. PRINT NAME OF PROPERTY OWNER(S): _Jowy) of Mueoe/ Address of Property STREET: 44) OLEAN RD). CITY, STATE: _ GFAST Avieoert Crowsvoe puccen), VY zip: /Yos 2 | Mailing Addressof | sTREET- 300 GU Ave: Owner if different | | | _ | | | than above address | CITY, STATE: _GAST Ayyeoevy LAG zpiyor2 TELEPHONE: DAY (Vile) @S 2-7S90 EVENING 1K) 867-0 290 EMAIL ADDRESS: __SupeRvisoa @ -Lownefa vrora Cdn SPECIAL NEEDS: | SIGNATWRE OF PRO) ARTY OWNER(S): Uf you are an owner representative, print your name and title after signing). leper? ¢( td L500K. 2—-TOWAN Sup EVI SOR. DATE: _2°9-/77 SIGNATURE oF RE] RESENTATIVE OF THE GIANT HOGWEED PROGRAM: ~ | 3 C ACE : DATE: SA /17

Page 39

AURORATOWNCOURT 5ST JAMES F. GRANVILLE JEFFREY P. MARKELLO | ryt si TOWN JUSTICE HOE of TOWN JUSTICE AUT OT WIZ NY nasa he eat enerennrnnneeen ene TO: Aurora Town Board FROM: Jeffrey P. Markello DATE: 7/7/26 RE: Court Officers - 3 Hour Minimum When NYS Unified Court System (UCS) trained court officers were first engaged to provide security to our Town Justice Court, it was on the same terms as surrounding towns; ie, an hourly rate with a 3-hour minimum per court night. While it is rare for our UCS Court Officers to serve any less than three hours ona court night, that minimum has been honored over the years and paid through the court's security budget line A.1110.416. Please know that the level of UCS training and expertise these professional court officers bring to our Town Justice Court ensures the safety of all who appear in court, and it is important that we maintain a good relationship with them. Consistent with the practice of other local night courts, the 3-hour minimum recognizes that after their day shift in Buffalo courts, these officers drive out to East Aurora, stay until our last case is disposed, and don’t return home to their families until late that evening. Accordingly, we respectfully request the Town continue paying our court officers a minimum of three (3) hours each court night. Thank you for supporting our town court. Jeffrey P. Markello Town Justice @ AURORA TOWN COURTe571 MAIN STREET, EAST AURORA, NY 14052¢716-652-5275¢

Page 40

SUPERVISOR | see TOWN CLERK Charles D. Snyder T\UrOra Jeanne H. Viger (716) 652-7590 S/NY. (716) 652-3280 =a [email protected] [email protected] TOWN OF AURORA Aurora Municipal Center 575 Oakwood Avenue, East Aurora, NY 14052 5 D www.townofaurorany.gov June 25, 2026 ‘To: Town Board Members I respectfully request the Town Board approval of the Purchase of a 2027 Slate EV 4X2 Pickup Truck for $25,449.99. It is the Base Model with Red Wrapping option. It will require a $300 Deposit to order to be paid out of DB5130.217. A delivery date will be sometime in 2027, which will be determined after the deposit is paid. This remainder be paid for out of DB5130.217 in the 2027 Budget. Slate is an online purchase through the manufacturer, so this is a Proprietary Price with no way to bid a comparable alternative. It is currently the lowest price new Pickup Truck available in the United States regardless of Drivetrain. As a comparison of other suitable pickups to the needs of the Highway Department, I have attached the following alternative vehicles that are also low-cost vehicles: 2026 Ford Maverick Gas 4X2- $30,685 2026 Ford Ranger Gas 4X2- $36,635 2026 Ford F150 Gas 4X2- $41,820 This will replace a 2014 Ford F150 Gas 4X2 Pickup which will be declared surplus and auctioned off next year. Sincerely, David M. Gunner Superintendent of Highways

Page 41

Jepioesd/ua/oyneaje|s MAwWy//:Ssdy1y Gil ‘MOU SaL10S$e09D INOA yold 0} peau ON “YSOdep sjqnpuNnjyezuOU OOES 0 YIM MOjaq MOPUIM AJOAIEP ANOA Ul 4907 Japsosid 3OdS INO, U] YOO7 | eyeIS INO, Jepsosid WV 67:2 ‘9Z/SZ/9

Page 42

Jopioeid/ue/oyneeje|s MMy//:Sa}Y GIé Jequunu pod ‘QSIMJOYLO PeyJNOW SsejUN pasinbe. a4D Spey [IV sping = SUO]}IPUOD PUD SW, 94} 1ded9N | Aq 1OU} WAYUOD | ‘ADYJOd KDOAUd pud ‘SUOIPUOD PUD SUNS] SHISGOM JUSUOSIBY J9p410914 OY} 0} 99460 PUD PDO1 SADY | J9P4OO1d SIU} Buropjd 00°00€$ AVGOL ANG TWLOL yisodaq 00°00E$ LISOdaG HLIM MON asaqdoadd ‘NI SLV1S ANOA LAD a yOdg INOA Ul YOO] | a}e{S ANOA JEpIOel WY 67:2 ‘97Z/S7/9

Page 43

Seuosseo9e=p|AloBeyeoqnsgJoye}xe_seliosse00e=pjA1oHayeogseLiosseooe=Ho]e}20/ 210}S/U9/0jNe“a}e|sS MMWNY/:SdY deim soa]xe cit mi QE IEEE "}O}OLQNS ol} ul pepnjoul eq OU [JIM PUD Bulolid ajqn]IOAD SADY jou ADU S8LIOSSe99D SLUOS ‘S9aj UO!}OJUSWNDOP pup ‘seBi0Yo UOILOUNSaP ‘Seej jO}USWUIEAOB ‘uono4siBeu ‘esusol| ‘aj}} ‘Sexd} Sepnjoxe j0}0}qQNS, 66697'SZ$ jPyoIqns ubisep Aspujwyeid Bulpudd S994 PUD SOxDL 666678 jOJOJaNS se_Osseooy o0'0Sé¥2$ [DJOLQNS apoio NMOQGMV34d” JDIdd AAVINIAINS NSOISAG peeyy peoy au} Joy yINg | Yep] gy Jeep ALVIS WV 09:2 ‘9Z/S7Z/9

Page 44

poy doys//:sdyy yuoo/wuos €66 LOL% LOL%IZOTOL 1X “ZAd"OL% IqJ-qq-dyA=dwoywulgdG%'aL2' HAHOACNDL%PIOADLWAGVHYUD/ ured /Byuoopjoenew/einb cL/b .-09e9] YUOW 87 JOF UIUOW Jed Sd TON Peleus adLid JUsa}U] Ue 38D %° Ss9'0s$ 7975S AJCUIUWINS 1X @AIHBAEW 9COC ‘sjlejap JO] Jayeap aas ‘Ajen Aew J2Npold yenjsy “UMOUS abewl palewuab-Jayndwo) er ey goes mo woo'psoj ‘doug | sold 9 pling | @yoLVeAeW NV 95:2 ‘9Z/SZ/9

Page 45

ZAd""OL% LOL% 191% 9Z0ZI L%HAOUOARIN'DL%PIOIOL 1X" ZL°€66 oqy-qq-dya=dwiojulgqs%'a HASYHHyYUOO Auyed/Byuos pjoiienew/einByuoo/wWos poy doys//:sdyy Clie seo | UIUOW 87 104 UUOW Jod qd JON Poleuwiyss4 775$ ss9'0s$ O$ SUUM P1OIXO 7g JUIEd AJEUWWNS 1X @YIBAREW 9COC SUUM P1OJXO 10]0D 7 FUILEd JopoWw obuey, @MadjD1J9dNs - 1X @XINSAeW 9COC Wwoo'psoy'doys | eo 9 pling | @xUeAe| NV 99:2 “92/S72/9

Page 46

MedAPH'OL%' LOL%LOL% IX’ CMY aI" ulgds% oay-neNuooes-dya=dwow IZOZ J YPIOIOL%AS%Hy OHUE ured /6yvi09 seGues/esnByuos/ Uoo OL%J doys//:sqny ww09"pioyYO eL/g 5g oSeeT HIUOW 87 JO4 UJUOW Jed =O TON PeeUASy LLE$ g¢9'9¢S$ woo'psoy dous | ed 9 pling | @iebuey WY S:Z ‘92/SZ/9

Page 47

eL/e oqJ-AeNuoves-dyA=d "ead WJUlEG 1X MY avo" % avd'OL%'lOL% 191% 9Z0ZO1 HIOBUEYOZ %HP104IOZ%HAS%byuogjured/6yuoo/seHueseunByuos/wos psoy-doysy/:-sdyy sere? | U]UOPW B77 404 YPUOW dod wed ION Peleus] LL<Z$ Go9'9¢S$ jeo2/e3]D Paull W1eIW peHy Aqny S67$ 7s JUIEd AJCUWUUWWINS 1X oJabuey 9707 S6i7$ 72OIJE3]D PEzULL 2Ne79W Pay Aqny 10)0D JepoW ebueyD @Mai2Jadns - 1X @Jabuey 9CO0C NY S:2 ‘92/Sz/9 woo" pioy‘doys | eed 9 pling | qiebuey

Page 48

G [4/einByuoo/woo' ploy’ doys//:sdyy cL/L oqJ-AeNUODeS-dyA=dW9IUlE S%PLZ’AVOU'9SS'"ZAd'"OL% LIL%LOL%IZOCOL%OG LA OS L-ADL% P1049 2% AS % Hyuoo Aured/6)jU09/0 5goseeT UO 87 JOT TIUOW Jd =. Hd TON parewiiss Sd }@uUsa2U] Ue eH LOS$ oze'in$ AJEUIUUNS 1X @0S1-J 9COC "s]leJaP Oj Jayeap aes ‘Aye ABW JONpod yendy “UMOYS abel] payeisuab-JojNdwo) woo" psoy'dous | edd 9 pling | @0S}-4 WV 00:8 ‘9Z/SZ/9

Page 49

ZLiz =dwoquls oq}-nenuooes-dyrPLL ds%' AVON'9SS"’ZAd" D2% AIM Byuoogpured/Byu0 01% LOL%LOL%9ZOZOL%OGL-J OSL-AOZ%P40I 9/og |4/esnByuoo/wospioy doys//-scny 5gose81 WIUOW 87 JO MUO 48d qed TON peyewinss LOS$ O78'L7$ eae INOA Ul ayqeyene 7 AJOLUSAU] UDIB3S woo'psoy'doys | eed @ pling | @0S1-4 WY 00:8 ‘92/SZ/9

Page 50

(Seo eae ea : Trumiet SUPERVISOR . \ur ord TOWN CLERK CHARLES D. SNYDER ea gees JEANNE H. VIGER (716) 652-7590 (716) 652-3280 [email protected] [email protected] TOWN OF AURORA 575 Oakwood Avenue, East Aurota, NY 14052 www.townofaurorany.gov 5 E MEMO ; TO: Town Board FROM: Kathleen Moffat KE. Establish NY Forward Capital Project DATE: July 13, 2026 I respectfully request approval to establish Capital Project H2 - NY Forward West Falls Improvements and to record an interfund loan in the amount of $10,000.00 from General Fund (A) fund balance. The loan will be repaid in full by December 31, 2026, without interest. Repayment of the loan will be made from reimbursement proceeds received through the NY Forward Grant.

Page 51

SF Please note the following guidelines: e __ A shortage of less than $750 per line can be satisfied with this form requesting a budget transfer(s) between lines that are within the responsibility of a single Department Head. These will require the approval of the Supervisor. e A shortage of $750 or more per line can be satisfied with this form requesting a budget transfer(s) between lines that are within the responsibility of a single Department Head. These will require the approval of the Town Board. e __ A shortage of any amount can be satisfied with this form requesting a budget transfer(s) between lines which fall under the responsibility of different Department Heads. These will require the approval of the Town Board. e Budget transfers must be made PRIOR to the expenditure. e _ All budget transfers must be submitted to the Supervisor’s Office using this form. DEPARTMENT HEAD E (printed): Jeanne Viger SIGNATURE: on vz DATE: 7/13/2026 1. $1,000.00 FROM: A1410.413 Town Clerk — PT Contractual $2,424.50 ACCT NO. ACCT TITLE CURRENT BALANCE TO: A1410.401 Town Clerk — Office Supplies $1,399.08 ACCT NO. ACCT TITLE CURRENT BALANCE REASON: Transfer to prevent shortage after $1,170 tax envelopes payment 2.$ FROM: ACCT NO. ACCT TITLE CURRENT BALANCE TO: ACCT NO. ACCT TITLE CURRENT BALANCE REASON: 3.$ FROM: ACCT NO. ACCT TITLE CURRENT BALANCE TO: ACCT NO. ACCT TITLE CURRENT BALANCE REASON: 4.$ FROM: ACCT NO. ACCT TITLE CURRENT BALANCE TO: ACCT NO. ACCT TITLE CURRENT BALANCE REASON: 5 .§ FROM: ACCT NO. ACCT TITLE CURRENT BALANCE TO: . ACCT NO. ACCT TITLE CURRENT BALANCE REASON: APPROVALS: SUPERVISOR SIGNATURE : Date: TOWN BOARD MEETING APPROVAL DATE: Action #: C:\Users\mll\Desktop\Forms\Budget Transfer Request Form.doc

Page 52

+ " Ajanvot | 5G 7ANUTOTA NY. | BUDGET TRANSFER REQUEST FORM Please note the following guidelines: ¢ A shortage of less than $750 per line can be satisfied with this form requesting a budget transfer(s) between lines that are within the responsibility of a single Department Head. These will require the approval of the Supervisor. e — Ashortage of $750 or more per line can be satisfied with this form requesting a budget transfer(s) between lines that are within the responsibility of a single Department Head. These will require the approval of the Town Board. e — A shortage of any amount can be satisfied with this form requesting a budget transfer(s) between lines which fall under the responsibility of different Department Heads. These will require the approval of the Town Board. e Budget transfers must be made PRIOR to the expenditure. e _ All budget transfers must be submitted to the Supervisor’s Office using this form. a Fhe omy ' a mee a NEHEAD NAME (printed): KATH itt.) Morear SIGNATURE: ook ~_ |v — DATE: t. Lict (1¢. 1.$/ S006 From: ft 1G50 “TRMK GS + &sSeso MATS +3504, 44 ; I ps dhs (417440 ) a ACCT NO. ACCT TITLE CURRENT BALANCE ; TO: A (Sih ACCT NO. “’ CURRENT BALANCE REASON: “To Coenect Oeepeawsl Aeeeoreieno, fee“ is 2.$ FROM: ACCT NO. ACCT TITLE CURRENT BALANCE TO: ACCT NO. ACCT TITLE CURRENT BALANCE REASON: 3.$ FROM: ACCT NO. ACCT TITLE CURRENT BALANCE TO: ACCT NO. ACCT TITLE CURRENT BALANCE REASON: 4.$ FROM: ACCT NO. ACCT TITLE CURRENT BALANCE TO: ACCT NO. ACCT TITLE CURRENT BALANCE REASON: 5 .§$ FROM: ACCT NO. ACCT TITLE CURRENT BALANCE TO: ACCT NO. ACCT TITLE CURRENT BALANCE REASON: APPROVALS: SUPERVISOR SIGNATURE : Date: TOWN BOARD MEETING APPROVAL DATE: Action #: H:\KMoffat\My Files\Master Forms\Budget Transfer Request Form.doc

Page 53

SUPERVISOR TOWN CLERK CHARLES D. SNYDER JEANNE H. VIGER (716) 652-7590 (716) 652-3280 [email protected] [email protected] TOWN OF AURORA 575 Oakwood Avenue, East Aurora, NY 14052 www.townofaurorany.gov CS H MEMO TO: Town Board FROM: Kathleen Moffat RE: - Printer Surplus DATE: July 13, 2026 I respectfully request approval to surplus an Epson Stylus NX415 printer from the Senior Center (TOA #2106). The printer is over 10 years old and will not need to be replaced.

Page 54

<. > Town of Aurora Revenue Statement : 2026 for Accounting Period 6/30/2026 June UPERN (S0e/6 Kepoe:7— GENERAL FUND Original Approp Estimated Activity this Period Revenue YTD Uncollected YTD % Coll Account # Account Description Amount Revenue $2,402,438.00 $2,402,438.00 $0.00 $2,402,438.00 $0.00 100.00 A00-1001-0000-0000 REAL PROPERTY TAX A00-1089-0000-0000 PRIOR YEAR EXEMPTION REMOVALS $0.00 $0.00 $0.00 $9,312.20 ($9,312.20) 0.00 INTEREST & PENALTIES ON REAL PROPERTY $45,000.00 $45,000.00 $0.00 $23,354.46 $21,645.54 51.90 A00-1090-0000-0000 A00-1120-0000-0000 NON PROPERTY TAX DISTRIBUTION BY COUNTY $27,500.00 $27,500.00 $8,020.70 $15,922.71 $11,577.29 57.90 A00-1130-0000-0000 UTILITIES GROSS RECEIPTS TAX $0.00 $0.00 $14.91 $152.08 ($152.08) 0.00 A00-1255-0000-0000 CLERK FEES $5,000.00 $5,000.00 $558.11 $2,257.06 $2,742.94 45.14 A00-1972-0000-0000 PROGRAMS FOR THE AGING $5,000.00 $5,000.00 $404.00 $5,662.00 ($662.00) 113.24 A00-1973-0000-0000 OTHER INCOME LUNCH PROGRAM $3,500.00 $3,500.00 $0.00 $1,104.00 $2,396.00 31.54 WEST FALLS PARK RENTAL $0.00 $0.00 $0.00 $175.00 ($175.00) 0.00 A00-2001-0000-0000 A00-2004-0000-0000 LEAGUE ENTRY FEE - ADULT $5,200.00 $5,200.00 $500.00 $4,545.00 $655.00 87.40 A00-2005-0000-0000 ADULT SPORTS $6,000.00 $6,000.00 $1,200.00 $4,770.00 $1,230.00 79.50 A00-2025-0000-0000 COMMUNITY POOL $48,000.00 $48,000.00 $23,703.50 $39,510.50 $8,489.50 82.31 A00-2025-0001-0000 SPEC. REC. FAC. INCOME-PERMITS $1,500.00 $1,500.00 $0.00 $1,430.00 $70.00 95.33 A00-2025-0002-0000 SPEC. REC. FAC. INCOME-DONATIO $8,000.00 $8,000.00 $0.00 $0.00 $8,000.00 0.00 A00-2026-0001-0000 AQUATIC CLUB REGISTRATION $47,000.00 $47,000.00 $1,120.00 $11,771.00 $35,229.00 25.04 A00-2026-0003-0000 AQUATIC CLUB REIMBURSEMENT $3,000.00 $3,000.00 $0.00 $0.00 $3,000.00 0.00 A00-2027-0001-0000 SWIM LESSONS REGISTRATION $25,000.00 $25,000.00 $1,255.00 $19,165.00 $5,835.00 76.66 A00-2030-0001-0000 TENNIS LESSONS REGISTRATION $3,900.00 $3,900.00 $156.00 $4,144.30 ($244.30) 106.26 A00-2050-0000-0000 GOLF LESSONS/LEAGUE $2,000.00 $2,490.00 $0.00 $2,490.00 $0.00 100.00 A00-2052-0000-0000 CAMPS/CLINICS $1,000.00 $1,000.00 $0.00 $0.00 $1,000.00 0.00 A00-2054-0000-0000 TOT PROGRAMS $3,250.00 $3,250.00 $35.00 $3,535.00 ($285.00) 108.77 A00-2055-0000-0000 SUMMER PLAYGROUND SPORTS $15,000.00 $15,000.00 $2,253.00 $14,098.00 $902.00 93.99 A00-2056-0000-0000 EDUCATION PROGRAMS $30,000.00 $30,000.00 $340.00 $33,713.00 ($3,713.00) 112.38 A00-2057-0000-0000 ART/THEATER/DANCE $1,400.00 $1,400.00 $145.00 $1,845.00 ($445.00) 131.79 A00-2058-0000-0000 BOWLING $1,900.00 $1,900.00 $0.00 $0.00 $1,900.00 0.00 A00-2061-0000-0000 STAFF TRAINING $4,500.00 $4,500.00 ($200.00) $3,106.00 $1,394.00 69.02 A00-207 1-0000-0000 MINI BUS CONTRIBUTIONS $5,000.00 $5,000.00 $449.00 $2,476.00 $2,524.00 49.52 A00-2073-0000-0000 CONCERT SPONSORSHIPS $3,200.00 $3,200.00 $1,600.00 $2,400.00 $800.00 75.00 A00-2080-0001-0000 INDEPENDENCE DAY SPONSORSHIP $10,825.00 $10,825.00 $925.00 $1,575.00 $9,250.00 14.55 A00-2085-0000-0000 EAST EGG HUNT $700.00 $700.00 $0.00 $700.00 $0.00 100.00 A00-2088-0001-0000 PLAYGROUNDS REGISTRATION $67,000.00 $67,000.00 $1,392.00 $65,274.00 $1,726.00 97.42 A00-2150-0000-0000 SALE OF ELECTRICAL POWER $0.00 $0.00 $78.14 $175.13 ($175.13) 0.00 A00-2268-0000-0000 DOG CONTROL SERVICES, OTHER $0.00 $25,000.00 $0.00 $25,000.00 $0.00 100.00 GOVERNMENTS A00-2351-0000-0000 MINI-BUS REIMBURSEMENTS $10,000.00 $10,000.00 $0.00 $2,572.77 $7,427.23 25.73 A00-2401-0000-0000 INTEREST & EARNINGS $200,000.00 $200,000.00 $4,930.82 $158,221.17 $41,778.83 79.11 A00-2455-0000-0000 GAS WELL COMMISSION/PRODUCTION $4,500.00 $4,500.00 $802.01 $5,069.68 ($569.68) 112.66 A00-2544-0000-0000 DOG LICENSES $28,000.00 $28,000.00 $2,316.00 $12,317.00 $15,683.00 43.99 A00-2555-0000-0000 BUILDING ALTERATION PERMITS $135,000.00 $135,000.00 $17,054.25 $82,439.92 $52,560.08 61.07 eport run by: kathleen Page 1 of 6 07/02/202

Page 55

Month Year Reported: ----> June 2026 CLERK'S MONTHLY REPORT Town Name: ----------------- > Town of Aurora Prepared By: ----------------- > Jeanne H. Viger Date Submitted: ------------- > Jul, 01 2026 TO THE Supervisor: Pursuant to Section 27, Subd. 1, of the Town Law, | hereby make the following statement of all the fees and monies received by me in connection with my office, during the month above stated, excepting only such fees and monies the application and payment of which are otherwise provided for by law. RSC Revenue Item Total Town Other Code Description rpt_RT_CMR_03_2011 Count Revenue Portion Disburses 100 SPORTING LICENSE REVENUE 15 355.00 21.09 333.91 200 DOG LICENSE REVENUE 158 1,960.00 1,786.00 174.00 301 MARRIAGE LICENSE 10 400.00 175.00 225.00 303 CERTIFIED MARRIAGE CERTIFICATE 8 110.00 110.00 0.00 602 DEATH CERTIFICATE 6 350.00 350.00 0.00 Report Totals: 197 3,175.00 2,442.09 732.91 REVENUES TO SUPERVISOR - CLERK FEES 656.09 REVENUES TO SUPERVISOR - DOG FEES 1,786.00 TOTAL TOWN REVENUES TO SUPERVISOR: 2,442.09 Amount paid to NYS DEC REVENUE ACCOUNTING 333.91 Amount paid to DEPT. OF AG. AND MARKETS 174.00 Amount paid to STATE HEALTH DEPARTMENT FOR MARRIAGE LICENSES 225.00 TOTAL DISBURSED TO OTHER AGENCIES: 732.91 TOTAL DISBURSED: 3,175.00 7 [w| 20 le awa D.Suydar Supervisor, Shin, of New Monty pouty of Erie, Town of Aurora Jeanne H. Viger being duly sworn, says that she/he is the Town Clerk of the Town of Aurora that the foregoing is a full and true statement of all Fees and Monies received by her/him during the month stated, excepting only such Fees the application and payment of which are otherwise provided for by law. Subscribed and Sworn to before me ; [ () += day of __SULY / 20QU Tow Glee Notary Public STEPHANIE LYNN MEYER Notary Public - State of New York No. 01ME0049253 Qualified in Erie County My Commission Expires April 23, 2030 DL-4 (Rev. 1/2011) rpt_ RT_CMR_04_2011 - 01/07/12 =

Page 56

TOWN OF AURORA Aurora Municipal Center 575 Oakwood Avenue, East Aurora, NY 14052 From: Jeanne Viger, Town Clerk Monthly Statement — Tax Collection To: Charles D. Snyder, Town of Aurora Supervisor Pursuant to Section 27 Subd. 1 of the Town Law, | hereby make the following statement of all fees and monies received by me during the month of June, 2026 in connection with the collection of taxes, excepting only such fees the application and payment of which are otherwise provided for by law: Received From Type of Receipt Amount Taxes Town/County tax $ 20,438.19 Taxes Penalties $ 1,532.86 Taxes Interest -0- Taxes NOW Acct Interest $ 0.56 Taxes Total Received $ 21,791.61 State of New York County of Erie Town of Aurora Jeanne Viger, being duly sworn, says that she is the Town Clerk of the Town of Aurora; that the foregoing Is a full and true statement of all fees and monies applicable to tax collection received by her during the month stated excepting only such fees and monies the application of which are otherwise provided for by law. A ff Jeanne Viger, Town Clerk Subscribed and Sworn to before me this_(g@_ day of .\WLY _, 20e2Uv Yu wie Notary Publi STEPHANIE LYNN MEYER Notary Public - State of New York No. 01ME0049253 Qualified in Erie County My Commission Expires April 23, 2030

Page 57

(oD TOWN OF AURORA Aurora Municipal Center 575 Oakwood Avenue, East Aurora, NY 14052 From: Jeanne Viger, Town Clerk Monthly Statement — Water Fee Collection To: Charles D. Snyder, Town of Aurora Supervisor Pursuant to Section 27 Subd. 1 of the Town Law, | hereby make the following statement of all fees and monies received by me during the month of June, 2026 in connection with the collection of water fees, excepting only such fees the application and payment of which are otherwise provided for by law: Received From Type of Receipt Amount Water Billing Water Bills $ 958.15 Total Received $ 958.15 State of New York County of Erie Town of Aurora Jeanne Viger, being duly sworn, says that she is the Town Clerk of the Town of Aurora; that the foregoing is a full and true statement of all fees and monies applicable to water fee collection received by her during the month stated excepting only such fees and monies the application of which are otherwise provided for by law. f/f i“ \} { .4 ee whe ae LE Jeanne ne Viger, Town Clerk Subscribed and Sworn to before me this Y day of _.)ULyY _, 202 Notary Public Awe w/ | \ STEPHANIE LYNN MEYER Notary Public - State of New York No. 01ME0049253 Qualified in Erie County My Commission Expires April 23, 2030

Page 58

(ob TOWN OF AURORA DOG CONTROL REPORT: Jun-26 PHONE CALLS RECEIVED |TOWN OF AURORA EAPD SARDINIA |HOLLAND' |TOTAL CALLS Attack/Fighting 0 Barking 1 1 Bites us Cats 2 Damage by Dogs Deceased Dogs 1 Found Dogs 2 2 Injured/Sick Licensing 5 1 2 Loose/Unleashed Dogs 3 1 Lost Dogs 3 1 1 Miscellaneous Calls Mutual Aid MVC-Dogs/Cats Other Animals Threatening Dogs 1 Welfare TOTAL 11 6 2 9 28 IMPOUNDMENTS: DATE BREED Town Amount 6/6/2026 Pit Bull Mix Aurora $105 6/18/2026 Beagle/Hound Sardinia $90 6/26/2026 Havanese Aurora S65 6/26/2026 Husky Holland S5 adopted out Total $265 COURT: 0

Page 59

OF Town of Aurora Building Department Monthly Report - April 2026 Town Village Totals Permits Denied 1 3 4, Permits Issued 26 26 52 CO/TCO/CCs Issued 27 18 45 Current Month Fee Total S 9,978.14|S 9,879.63|1S 19,857.77 Fees YTD S 23,595.08 | S 19,706.34|$ 43,301.42 2025 Fees Comparison S 5,194.50|S 1,996.75|$ 54,998.63 Inspections Completed Building Permit 137 103 240 Fire Safety 2 3 5 Compliants received 0 3 3 nticec Se Complaint Violations issued 3 3 6 Permits Expired 20 12 32 2nd Notice Permit Expired 10 1 11 Violations - expired permits 3 0 3 2nd Notice Viols - exp permits 2 1 3 Zoning Compliance Letters 1 3 4 False Alarms 13 0 13 Stop Work Orders 0 0 0 Justice Court Action initiated 0 0 0 Zoning Board Cases - New 3 5 6 Site Plan Applications 1 1 2 Special Use Permit Applications 2 0 2 ODA Applications 0 0 0 Rezone Applications 0 0 0 Subdivision Applications 0 0 0

Page 60

Town of Aurora/Village of East Aurora Building Permits Issued 06/01/2026-06/30/2026 Work Category Owner Issued Date Municipality Permit fees Construction Number of Notes Permit Permit address Property ID total Cost number 175.16-1-11 Accessory structures and buildin; BOB & JENNIFER BRAYMAN 6/30/26 Aurora $88.00 $15,000.00 4 2026-127 559 SOUTH ST 1470 EMERY RD 187.00-4-32. Other Chelea Walls 6/8/26 Aurora $50.00 $6,800.00 1 2026-167 175.00-2-10. Residential Builds KELLY KLOC 6/2/26 Aurora $498.00 $25,000.00 1 2026-177 504 MILL RD 1145 LUTHER RD 186.00-4-65. Residential Builds CHRISTIE & JEREMY OOSTERKAI 6/4/26 Aurora $2,513.00 $1,500,000.00 1 p/r fee $200 2026-194 1007 QUAKER RD 174.00-2-12 Accessory structures and buildiny Leah Bernhardi 6/26/26 Aurora $88.00 $2,000.00 1 2026-207 2026-211 2093 BOIES RD 200.00-4-48. Residential Builds TREVOR & CONNOR VAIL 6/23/26 Aurora $1,828.50 $552,886.00 4 p/r fee $200 2026-222 579 GROVER RD 174.00-3-44. Accessory structures and buildin; Jason Marchioli 6/17/26 Aurora $80.00 $5,000.00 1 2026-224 910 AURORA PORTERVILLE RD 165.00-1-6.1 Residential Builds LANCE & JOYCE ORTMAN 6/15/26 Aurora $202.50 $100,000.00 1 2026-228 265 GENEVA RD 175.16-1-20 Pools PATRICIA GUNNER 6/1/26 Aurora $75.00 $6,742.00 i 2026-231 1115 UNDERHILL RD 187.00-3-46. Residential Builds DARBURT ALMETER 6/16/26 Aurora $148.00 $50,000.00 1 2026-237 1452 CENTER ST 187.00-3-18. Other JASON LINDSAY 6/8/26 Aurora $50.00 $2,000.00 1 2026-238 31 GLENRIDGE RD 176.06-2-44 Residential Builds JOE & SUE MC PHERSON 6/16/26 Aurora $142.50 $59,999.00 1 2026-239 1840 BOIES RD 200.00-1-20. Pools Michael Bojanowski 6/5/26 Aurora $100.00 $0.00 1 2026-240 1555 CENTER ST 187.00-4-28. Residential Builds Michael DuFrane 6/5/26 Aurora $250.75 $0.00 1 2026-242 470 CENTER ST 175.16-2-8.1 Residential Builds JEFF CREWSON 6/9/26 Aurora $110.00 $11,000.00 1 2026-244 109 RUSKIN RD 164.16-4-35. Other TIM LOFTUS 6/9/26 Aurora $50.00 $1,840.00 1 2026-245 866 MILL RD 187.01-1-11 Pools LOUIS & ERICA CALOSTIPES 6/17/26 Aurora $100.00 $0.00 1 2026-246 2157 LEWIS RD 201.00-3-29 Accessory structures and buildin; Keith Stiles 6/12/26 Aurora $115.00 $20,838.00 1 2026-249 1652 HUBBARD RD 175.04-1-22 Pools Micki Morris 6/10/26 Aurora $100.00 $0.00 1 2026-250 68 COOK RD 176.00-2-48 Residential Builds Tom Scheeler 6/10/26 Aurora $266.00 $0.00 1 2026-252 1631 CENTER ST 187.00-4-32. Accessory structures and buildinj Ron Waldron 6/23/26 Aurora $100.00 $5,500.00 1 2026-253 1053 OLEAN RD 188.01-1-18. Accessory structures and buildin; James Bebee 6/16/26 Aurora $48.00 $1,000.00 1 2026-256 808 MILL RD 187.01-1-4.1 Accessory structures and building MARK MRUK 6/17/26 Aurora $487.25 $0.00 1 2026-260 316 WINDSOR LANE 164.11-1-43 Pools Leigh Zimmerman 6/23/26 Aurora $150.00 $105,784.00 1 2026-262 655 QUAKER RD 175.09-2-4 Residential Builds DANIEL DAYTON 6/17/26 Aurora $140.25 $0.00 1 2026-269 75 DAVIS RD 174.01-2-5.2 Other WILLIAM DARLING 6/18/26 Aurora $50.00 $690.00 1 2026-270 920 AURORA PORTERVILLE RD 165.00-1-7 Residential Builds Christina Sorgi 6/29/26 Aurora $110.00 $1,895.00 1 2026-275 2147 LEWIS RD 201.00-3-28 Other Justin Hannon 6/29/26 Aurora $75.00 $9,485.00 1 2026-276 174 ROYCROFT CIR 164.16-4-21 Other DAN FRANKLIN 6/25/26 Aurora $50.00 $4,550.00 1 2026-277 777 WILLARDSHIRE RD 163.00-3-30. Pools GARY HILL 6/25/26 Aurora $100.00 $0.00 1 2026-280 21 CREEKVIEW CT 175.10-2-20 Other Dawson Knox 6/25/26 Aurora $50.00 $15,000.00 1 2026-285 1068 SCHOPPER RD 200.00-1-46. Pools Keith Wegrzyn 6/29/26 Aurora $150.00 $15,000.00 1 2026-299 1075 DAVIS RD 186.00-5-37 Commercial building ASHLEY GERHARD 6/30/26 Aurora $335.00 $0.00 1 Total Town Fees $8,700.75 $2,518,009.00 33 less p/r fees -$400.00 $8,300.75 2025-397 601 OAKWOOD AVE 176.05-7-2.1 Commercial building Jerry Thompson Sr 6/9/26 East Aurora $485.00 $75,000.00 1 2025-527 155 OLEAN ST 176.05-6-35 Accessory structures and buildin} JOHN LYONS 6/11/26 East Aurora $64.00 $1,500.00 1 2026-104 128-152 GREY ST 175.07-1-13 Commercial building FBBT/US PROPERTIES LLC (BENI 6/9/26 East Aurora $1,688.00 $80,000.00 1 2026-113 203 MAIN ST 164.19-6-9.2 Signs Katie Crook 6/25/26 East Aurora $60.00 $500.00 a 2026-144 64 NORTH WILLOW ST 164.20-2-41 Residential Builds Kim McCarrick 6/1/26 East Aurora $155.50 $66,000.00 1 2026-196 500 NORTH ST 164.16-3-5 Residential Builds Joe Ann Willson 6/30/26 East Aurora $406.00 $50,000.00 1 2026-204 847 EAST FILLMORE AVE 165.17-5-4 Residential Builds Lisa Abt 6/4/26 East Aurora $110.00 $38,920.00 il 2026-218 473 LINDEN AVE 175.12-5-3 Accessory structures and buildiny MICHAEL & DANA WYMER 6/1/26 East Aurora $92.50 $30,000.00 1 2026-221 285 MAIN ST 164.20-13-6 Signs David Brown 6/23/26 East Aurora $60.00 $5,700.00 1 2026-227 296 PROSPECT AVE 175.08-1-21 Accessory structures and buildiny Rebecca Biscaro 6/5/26 East Aurora $45.00 $13,000.00 i

Page 61

175.08-8-26 Other ERICA CROOK 6/1/26 East Aurora $50.00 $5,050.00 1 2026-232 370 LINDEN AVE Graham Snyder 6/1/26 East Aurora $50.00 $9,011.00 1 2026-233 156 OLEAN ST 176.05-5-35 Other 164.20-13-1¢ Pools ELLEN AUGELLO 6/2/26 East Aurora $100.00 $0.00 1 2026-234 294 OAKWOOD AVE 176.05-7-2.1 Commercial building GERALD THOMPSON 6/4/26 East Aurora $110.00 $29,000.00 1 2026-235 597 OAKWOOD AVE 175.11-3-2.1 Accessory structures and building Gwendalyn Saltal 6/9/26 East Aurora $64.00 $5,595.00 1 2026-236 385 MILL RD SHANNA DUSSY 6/8/26 East Aurora §50.00 $2,000.00 1 2026-243 278 PROSPECT AVE 175.08-1-25 Other 164.16-2-28 Other Michael Dudley 6/15/26 East Aurora $50.00 $130.00 1 2026-247 393 NORTH ST 176.09-2-4.1 Demo of fire damaged shed 3/24 Steven Helmicki 6/9/26 East Aurora $50.00 $50.00 1 2026-248 336 OLEAN ST BNY EAC-I, LLC 6/25/26 East Aurora $50.00 $32,000.00 1 2026-265 190 MAIN ST 164.19-5-13. Commercial building Residential Builds Catherine Blondell 6/22/26 East Aurora $130.00 $16,500.00 1 2026-274 267 CENTER ST 175.12-1-10 Accessory structures and buildiny DAVID & JANICE GOODRICH 6/24/26 East Aurora $81.50 $0.00 1 2026-281 492 FILLMORE AVE 164.20-6-14 DAVE O;BRIEN 6/24/26 East Aurora $110.00 $26,000.00 1 2026-282 27 NORTH WILLOW ST 164.19-5-30 Residential Builds Accessory structures and buildings MARY MC GRATH 6/26/26 East Aurora $182.00 $24,000.00 1 2026-291 65 HAMLIN AVE 164.19-4-13 Total Village Fee $4,243.50 $509,956.00 23 Total Fees $12,544.25 $3,027,965.00 56

Page 62

C Town of Aurora/Village of East Aurora Certificate of Compliance/Occupancy Issued 06/01/2026-06/30/2026 Property ID Inspection name Workspace status Inspection status Visit date Visit result Municipality Permit number Address 176.00-4-4 Final Building Department Inspection Finished Completed 6/5/2026 Granted and fully completed Aurora 2025-478 1927 LAPHAM RD 201.00-3-6 Final Building Department Inspection Finished Completed 6/5/2026 Granted and fully completed Aurora 2026-174 1905 CORNWALL RD 2026-240 1555 CENTER ST 187.00-4-28.1 Final Building Department Inspection Construction started Active 6/5/2026 Granted but outstanding matters Aurora 80 STEWART CT 163.03-1-4 Final Building Department Inspection Finished Completed 6/8/2026 Granted and fully completed Aurora 2025-416 186.04-2-7 Final Building Department Inspection Occupied Completed 6/10/2026 Granted and fully completed Aurora 2026-193 1799 MILL RD 2025-485 719 DAVIS RD 174.00-3-5.111 Final Building Department Inspection Construction started Active 6/10/2026 Granted but outstanding matters Aurora 175.06-2-1 Final Building Department Inspection Finished Completed 6/12/2026 Granted and fully completed Aurora 2025-320 350 QUAKER RD 187.02-2-17 Final Building Department Inspection Finished Completed 6/12/2026 Granted and fully completed Aurora 2025-492 50 CENTER RIDGE RD 186.04-1-6 Final Building Department Inspection Construction started Active 6/16/2026 Failed Aurora 2025-623 1834 MILL RD 187.00-3-9.111 Final Building Department Inspection Construction started Active 6/17/2026 Failed Aurora 2025-239 1773 BLAKELEY RD 187.00-3-9.111 Final Building Department Inspection Occupied Active 6/17/2026 Failed Aurora 2025-261 1727 BLAKELEY RD 2 MORNINGSIDE CT 176.10-3-31 Final Building Department Inspection Finished Completed 6/17/2026 Failed Aurora 2025-028 1085 UNDERHILL RD 187.00-3-42.111 Final Building Department Inspection Finished Completed 6/18/2026 Granted and fully completed Aurora 2026-081 2026-081 1085 UNDERHILL RD 187.00-3-42.111 Temporary Certificate of Occupancy Finished Completed 6/22/2026 Granted and fully completed Aurora 659 QUAKER RD 175.09-2-3 Final Building Department Inspection Construction started Active 6/22/2026 Failed Aurora 2026-168 2026-008 4479 TRANSIT RD 174.00-1-35.12 Final Building Department Inspection Construction started Active 6/23/2026 Granted but outstanding matters Aurora 2025-322 1823 DAVIS RD 199.03-1-4 Final Building Department Inspection Construction started Active 6/26/2026 Failed Aurora 2025-218 1153 BIG TREE RD 176.00-1-3.1 Final Building Department Inspection Finished Completed 6/26/2026 Granted and fully completed Aurora 2025-252 600 QUAKER RD 175.05-1-9 Final Building Department Inspection Finished Completed 6/30/2026 Granted and fully completed Aurora 2025-344 984 LAWRENCE AVE 165.13-4-15 Final Building Department Inspection Finished Completed 6/30/2026 Granted and fully completed Aurora 2025-028 2 MORNINGSIDE CT 176.10-3-31 Final Building Department Inspection Finished Completed 6/30/2026 Granted and fully completed Aurora 2026-054 23 GREY ST. (49 KNOX RD.) 164.19-7-23.1 Final Building Department Inspection Construction started Active 6/2/2026 Failed East Aurora 2026-092 123 GREY ST 175.07-1-1.11 Final Building Department Inspection Finished Completed 6/2/2026 Granted and fully completed East Aurora 2025-494 63 SOUTH GROVE ST 164.20-11-19 — Final Building Department Inspection Finished Completed 6/3/2026 Granted and fully completed East Aurora 2025-251 568 LINDEN AVE 175.12-4-38 Final Building Department Inspection Finished Completed 6/5/2026 Granted and fully completed East Aurora 2025-250 259 CENTER ST 175.12-1-9 Final Building Department Inspection Finished Completed 6/5/2026 Granted and fully completed East Aurora 2025-022 123 GREY ST 175.07-1-1.11 Final Building Department Inspection Finished Completed 6/5/2026 Granted and fully completed East Aurora 2025-034 123 GREY ST 175.07-1-1.11 Final Building Department Inspection Finished Completed 6/5/2026 Granted and fully completed East Aurora 2025-034 123 GREY ST 175.07-1-1.11 | Temporary Certificate of Occupancy Finished Completed 6/5/2026 Granted and fully completed East Aurora 2025-249 482 FILLMORE AVE 164.20-6-15 Final Building Department Inspection Finished Completed 6/8/2026 Granted and fully completed East Aurora 2025-293 516 NORTH ST 164.16-3-8.1 Final Building Department Inspection Finished Completed 6/8/2026 Failed East Aurora 2026-110 274 WALNUT ST 175.08-7-3 Final Building Department Inspection Finished Completed 6/10/2026 Granted and fully completed East Aurora 2025-584 842 EAST FILLMORE AVE 165.17-4-49 Final Building Department Inspection Finished Completed 6/10/2026 Granted and fully completed East Aurora 2025-293 516 NORTH ST 164.16-3-8.1 Final Building Department Inspection Finished Completed 6/16/2026 Granted and fully completed East Aurora 2026-233 156 OLEAN ST 176.05-5-35 Final Building Department Inspection Finished Completed 6/16/2026 Granted and fully completed East Aurora 2026-027 126 BUFFALO RD 164.19-2-15 Final Building Department Inspection Construction started Active 6/18/2026 Failed East Aurora 2025-460 160 MAIN ST 164.19-5-13.111 Final Building Department Inspection Finished Completed 6/20/2026 Granted and fully completed East Aurora 2025-614 160 MAIN ST 164.19-5-13.111 Final Building Department Inspection Finished Completed 6/20/2026 Granted and fully completed East Aurora 2025-464 628 PERSONS ST 176.05-7-7.1 Final Building Department Inspection Construction started Active 6/22/2026 Granted but outstanding matters East Aurora 2025-124 195 SYCAMORE ST 175.08-6-12 Final Building Department Inspection Finished Completed 6/23/2026 Granted and fully completed East Aurora 2025-409 16 BUFFALO RD 164.19-2-9 Final Building Department Inspection Finished Completed 6/23/2026 Granted and fully completed East Aurora

Page 63

2025-288 303 NORTH ST 164.16-1-27 Final Building Department Inspection Construction started Completed 6/24/2026 Granted and fully completed East Aurora 2025-277 279 PROSPECT AVE 175.08-9-8 Final Building Department Inspection Finished Completed 6/24/2026 Granted and fully completed East Aurora Final Building Department Inspection Finished Completed 6/24/2026 Granted and fully completed East Aurora 2026-106 162 PINE ST 165.17-3-18 2026-229 320 GIRARD AVE 164.16-1-48 Final Building Department Inspection Finished Completed 6/26/2026 Granted and fully completed East Aurora 2025-049 320 GIRARD AVE 164.16-1-48 Final Building Department Inspection Finished Completed 6/26/2026 Granted and fully completed East Aurora Final Building Department Inspection Finished Completed 6/26/2026 Granted and fully completed East Aurora 2026-052 320 GIRARD AVE 164.16-1-48 2026-001 187 WALNUT ST 175.08-8-11.5 Final Building Department Inspection Finished Completed 6/30/2026 Granted and fully completed East Aurora 2025-354 187 WALNUT ST 175.08-8-11.5 Final Building Department Inspection Finished Completed 6/30/2026 Granted and fully completed East Aurora 2025-349 187 WALNUT ST 175.08-8-11.5 Final Building Department Inspection Finished Completed 6/30/2026 Granted and fully completed East Aurora

Page 64

TOWN OF AURORA SENIOR CENTER DIRECTOR’S REPORT Month of June 2026 The mission of the Town of Aurora Senior Center is to help older adults remain healthy and active through participation in recreational pursuits and to provide leadership and advocacy to ensure the availability of leisure and recreational opportunities for seniors. ADMINISTRATION: I attended the Live Well Erie meeting at the Roswell Community Center on June 4". It was an excellent gathering and sharing of information. On June 10" I attended our quarterly director’s meeting at the Tosh Collins Senior Center. The center has a new director, and we enjoyed exchanging information with her. Oue center has hosted 8 University Expresses classes in June. The classes vary from baseball to mystery to exercise. They are very well attended with a constant crowd of 40+. Day & time: M-F 8:00am- 4:00pm Participants: Approximately 45 per day Title: LINE DANCING Day & time: Mondays, 9:00 — 10:00 (beginners) 10:15 — 1:15 (advanced) Participants: 22 people Supervisors: Nance Baranowski Title: SENIOR NOTES Day & time: Mondays, 12:45 — 2:30pm Participants: 23 people Supervisor: Kathy Almeter Title: EUCHRE Day & time: Mondays, 1:00 — 4:00pm Participants: 24 people Title: PINOCHLE Day & Time Fridays, 1:00 — 4:00pm Participants: 20 people Title: CERAMICS Day & time: Tuesdays, 10:00am — 4:00pm Participants: 35 people Supervisor: Elaine Schiltz Title: EXERCISE CLASS Day & time Tuesdays & Wednesdays 8:30 — 9:30am Participants: 14 people Title: TAI CHI Day & time: Tuesdays & Thursdays 3:00 beginners 3:30veterans Supervisor: Judy Augustyniak & Susan Ott Participants: 15 people Title: TAI CHI — advanced Day & time: Mondays 10:00 & Thursdays 9:00am Supervisor: Dennis Desmond Participants: 10 Title: YOGA Day & time: Wednesdays, 9:45 — 11:00am Supervisor: Amy Sheehan Participants: 14 people Title: BOWLING Day & time: Wednesdays, 1:00pm Supervisor: Barb D’ Amato Participants: 24 people Title: PAINTING Day & time: Wednesdays, 1:00 — 3:30pm Supervisor: Walt Carrick Participants: 4 people Title: BRIDGE Day & time: Wednesdays, 9:30am — 2:00pm Supervisor: Dave Lorcom Participants: 24 people Title: SENIOR CLUB Day & time: Thursdays, 10:00am — 3:00pm President: Bev Ciszkowski Title: PACE (people with arthritis can exercise) Day & time: Fridays, 9:00 — 10:00am Supervisor: Donna Bodekor Participants: 12 people Title: SEWING & QUILTING Day & time: Tuesday 10-2pm Supervisor: Terry Piper Participants: 12 people Title: 55 ALIVE — Defensive driving classes Day & time: 1* Monday & Wednesday of the month — September 2026 Supervisor: Ronald Krowka Participants: 40 people max.

Page 65

Title: SCRABBLE Day & time Wednesdays 9:30-11:00am Supervisor: Dianne Bender Participants: 8+ people Title: FIBER ARTS Day & time: Tuesdays 1% & 3" Participants: 12 people Title: MAHJONG Day & time: Mondays 2:00pm Supervisor: Lou Plotkin Participants: 12 Title: MEXICAN DOMINOS Day & time: Thursdays 9:30 am Supervisor: Laurie Smith Participants: 8+ Title: BOOK CLUB Day & time: 2™4 Wednesday of the month Supervisor: Barb Dadey Participants: 8-10 Title: Chess Club Day & time: Thursdays 10:00am Supervisor: Roberto Gesualdi Participants: 4 Title: Wii Bowling Day & time Tuesdays 12:30pm Supervisor: Cliff Lee Participants: 6 Title: Portrait Sketching Day & time: Fridays Supervisor: Kurt Almond Participants: varies 4-8 Title: Creative Painting Day & time: Friday 9-12noon Supervisor: Meg Hausauer Participants: 6 TRIPS June 3 — Buffalo River History Cruise June 17 — Seneca Allegany FUTURE TRIPS July 8 — Canandaigua Boat Cruise EVENTS & OTHER ACTIVITIES June — The Farm Market truck sponsored by Feedmore WNY is selling produce for our seniors and all community members for a fair price. June 18 — Clarity Group assisted our seniors with Medicare insurance June 24 — The Book Club read Delores Clairborne by Stephen King June 8 - Erie County Senior Services sponsored Trivia competition June 11 — The Thursday Senior Club Celebrated Flag Day with a trivia about the US Flag. June 18 — The Thursday Senior Club celebrated Father’s Day with games and prizes plus a treat from the office staff. June 25-- Erie County Social Worker, Danielle, has been assisting seniors on various topics. This has been a plus for our members and the center staff. June 25 — The Center for Elder Law and Justice presented a program on Money Management. They talked about finances, scams, and working with their volunteers to balance your checkbook. They offer volunteer assistance to individuals needing help, especially if no family members live nearby. NUTRITIONAL LUNCH PROGRAM Lunches are offered daily at a donation of $3.00. Our weekly count for the program is 358 per week. Lunch totals for the month of June are 1793. {In-house Frozen In-House Frozen Week of June 1 274 115 Week of June 8 276 110 Week of June 15 224 110 Week of JUNE 22 280 107 Week of June 29 190 107 (closed 7/3) Submitted by: Donna Bodekor

Page 66

6) East Aurora / Town of Aurora Police Department Interdepartmental Correspondence To: Mayor Luke Wochensky & Village Board; Supervisor Charles Snyder & Town Board From: Patrick Welch, Chief of Police Date: July 7th, 2026 Re: Monthly Report — June 2026 General Information Meetings: In addition to Village Board, Town Board and Staff meetings I also attended the following: e Erie County Police Chief's Association Monthly Meeting e Conducted six in person final pistol permit interviews e Met with Orchard Park PD and New York State Police about assistance for Heart of Music festival Conducted three interviews for Police Officer, ultimately choosing Tyler Baker Attended Erie County Stop-DWI annual awards with PO Patrick Shea Conducted one part-time public safety dispatcher interview Blue Zones virtual meeting Music Fest Post event meeting Met with Mayor and Legislator Lorigo about funding ideas Met with Professor Marty Floss and master’s student from Hilbert College on performing a manpower study. Attended NYS Chief's Association Board of Governor’s Meeting in Saratoga Springs. e Met with two Graduate students from RIT about an engineering study they are completing Special Events: The annual “Heart of Music Festival” was held on Saturday June 13%. The event went well with all of the advanced planning that was put into place. Festival organizers indicate a lighter crowd than usual. There were many other events happening on the same day in the Buffalo Niagara Region. There were a handful of drunk and disorderly disturbance calls reported later in the night. The festival organizer and participating venues are due to appear before the Village board at a later date to discuss the event.

Page 67

l= East Aurora / Town of Aurora Police Department Interdepartmental Correspondence Statistics Activity Village Outside of Village Total (YTD) Police calls 763 (4127) 409(2211) 1363 (7231) Fire/EMS calls 531 (2724) Response Time 2.5 4,4 3.5 911 Calls Received 436 (2465) Property Damage Accident 12 5 17(153) Injury Accidents 0/0 Fatal 2/0 Fatal 2(21)/1(Fatal) Leaving Scene Acc 5 1 6(28) Deer Struck PDO 1(2) 12(27) 13(29) Crimes Against Persons 4(22) 0(4) 4(26) (Harassment/Agg. Harassment Assault/Etc. Contempt of Court 0(3) 0(1) 0(4) Crimes-Drugs 0(1) 0(1) 0(2) Crimes-Property 6(36) 0(9) 6(45) (Larceny/Criminal Mischief, Making Graffiti) Burglary/Trespass 3(9) 0(3) 3(12) S&R-Lic/Reg 6(30) 0(8) 6(38) DWI 3(11) 1(10) 4(21) Warrant Arrests 1(7) 0(0) 1(7) Sex Crimes 0(2) 0(1) 0(3) Reckless Endangerment 0(1) 0(0) 0(1) Traffic Stops 310(1542) Traffic Tickets 100(600) 72(325) 172(925) Parking Tickets 17(105) 0(0) 17(105) Domestics 3(9) 0(5) 3(14) 9.41 MHL/22.09 PHL 4(15) 1(6) 5(21) Extreme Risk Protection Order 0(2) 0(0) 0(2) Car Seat Installations 0(3) 0(0) 0(3)

Page 68

2 yo W408 the ! 4m ARH East Aurora / Town of Aurora Police Department Interdepartmental Correspondence Training: All officers were assigned 30 daily training bulletins through Lexipol. Officers attended semi-annual firearms qualifications at the East Aurora Fish and Game Club. All officers qualified with their issued service weapon and patrol rifles. Lt. Mackey from Orchard Park PD filled in as Range officer since Lt. O’Hara’s departure. PO Alex Pierce is attending NYS Firearms instructor training this month and will be the department’s firearms instructor going forward. Arrests / Investigations While there were various arrests made during the Month of June, two arrests of note were: there were no out of ordinary arrets made in the month of June. Miscellaneous e Legislator Lindsay Lorigo has made a verbal commitment to provide funding to the department with $5,000 for the purchase of two police e-bikes and necessary equipment. Our current police bicycles are traditional mountain pedal bikes and will be kept and used as needed.

Page 69

(eK Town of Aurora All Calls & Complaints Summary Report by Date: 06-01-2026 through 06-30 -2026, for Category: BUILDING DEP ARTMENT WORK REQUI - Caller Name/Address Date/Phone Notes Closed Building Department Work Requi Steph 06-02-26 Please bring 15 recycling bins to town hall Town Hall from the 06-03-26 highway garage. Jason-15 minutes Donna 06-02-26 Bring a small load of mulch equal to 4-5 West Falls Library bags. 06-04-26 Nick-picked up from Weber's nursery Chris 06-02-26 Please close plumbing access panels in South Street Park pool 06-04-26 restrooms and park restrooms. Close ceiling and remove ladder in men's pool staff restroom. Right side chlorine pump does not appear to be pumpi ng effectively. Mike I|-pump adjusted, pannel closed, ladder moves , shower heads repaired. Paula 06-02-26 Please weed whack inside of the fenced area. Town Library 06-03-26 Jason/Bem-15 minutes Liz 06-04-26 Please weed property and cut back dead branches Highway office landscaping off 07-02-26 bushes. Chris/Jason-1 hour Mike | 06-08-26 Make shut parks garage doors when you leave in the morning for dog safety, cleanliness and safety. Meaghan 06-08-26 Please have Jason move tables for father/daugh Senior Center ter 06-12-26 dance Friday 1:30pm Jason Susan 06-08-26 the doors from our kitchen to the patio aren't workin Adult Day Care g. 06-08-26 One won't open at all and one is having a hard time opening. These are not automatic doors. Mike |-1 hour. Ground sill plate and lubricate hinge. Paula 06-09-26 We have ant activity by our windows facing Whaley 06-11-26 Town Library Ave. We have placed traps and vacuumed the ants up multiple times, but are still seeing them in large numbers. Is there anything the town can do to help mitigate the problem? Jason-.5 h ours. Used powder around target areas outside perimeter. Kathleen 06-15-26 Please try to replace bolt in arm that closes door in 06-15-26 575 Oakwood front. Mike-45 minutes Liz 06-15-26 Reinstall mailbox at highway department that was 06-15-26 Highway Building knocked down by a driver over the weekend. Mike |, Nate, Mike E-45 minutes. Page 7 07-08-26

Page 70

Caller Name/Address Date/Phone Notes | _ Closed William 06-15-26 A driver knocked over the cone and drove over the Town Library 06-15-26 Sewer main cover near the back porch of the library that Mike repaired. Please check out to See if damage Occurred. Nate and Mike | repaired. Jeanne 06-15-26 Assemble 3 standing work desk converters. Mike Town Hall | 06-16-26 Liz Fown Office 06-16-26 Mike I to meet Chris Rhoades in the office at @AM. 06-23-26 Chris will be working on the inside kennel. Have wants two kennéls inside. 1/2 hour meeting. Liz 06-17-26. Put worn American flags in flag box in West Falls, _Highway Building 06-22-26 resident. 06-18-26 Trée down on Tannery RdR by the6 bridge, Blocking one Tann ery Rd lane. Texted. Sean whé is already out taking care of Kandahar tree, 06-18-26 Bike busb | is planning on gathering :and leaving from Town Hall 06-23-26 Town Hall Parking lot 6/23/26. Block off North/West part of parking lot (area closest to the: flag pole), Jason dropped-off2 road closed signd 6/23/26, Donna (06-24.36 Please weed and mulch the bushes along King St. 06-26-26 ‘Senior Center The weeds are over taking the area. Jason and community sefvice person Elizabeth 06-25-26 Bring two boxes of paper from Town Hall to Town 06-25-26 Town courts Court. by Spmi today or tom between 8am-tOam. Jason Nick. 06-25-26 Saivice fuel pumps and:f change filters. Highway building Inspect and repair fire Suppression canopy. Donna . 06-29-26 Mow the lawn at West Fails this week. The lawn is ‘West Falls Library 06-20-36 getting long. Jason:45 minutes Dave 06-30-26 Mulch Town Hall. Town Hall Liz 06-30-26 Please put ancther screw in ‘the wood plaque: thathas 07-06-26 Parks Garage the sénior Van and rural transit: keys on it. We nedd one for the Sénior Wheelchair van. Thanks! Nick __ Total count: Building Department Work Requi 23 Page 2: ‘07-08-26

Page 71

Town of Aurora (o E All Calls & Complaints Summary Report by Date: 06-01-2026 throu gh 06-30-2026, for Category: PARKS - PARK S Caller Name/Address Date/Phone Notes Closed Parks Liz 06-01-26 Put lot closed signs up at parking lot used by Hamlin Park Kiwanis 06-02-26 for bbq on Tuesday, for Wed event. Bem/Jason-15 minutes Liz 06-01-26 Put road closed signs up to divert Kiwanis BBQ Hamlin Park traffic 06-02-26 by the park. Ben/Jason-15 minutes Meaghan 06-01-26 Clean the lodge and shed by 6/19/26.Jason-1 hour West Falls Park 06-15-26 Meaghan 06-01-26 Move supplies and equipment for West Falls Park West Falls Park 06-17-26 daycamp into shed by 6/19/26. They are at the Rec Department and at Hamlin Park. Contact Meagha n to meet with her and she will show you what needs to be moved. Jason-1 hour Meaghan 06-01-26 Clean shed and bathroom by 6/27/26. Jason-1 hour. . Warren Park 06-24-26 Meaghan 06-01-26 Set up stage for Backyard Bash. It starts 7/9/26. Let Main St behind Vidlers . Meaghan know when we plan to put up so she can give a heads up to make sure parking spots are empty. Dan 06-01-26 Please fix the backstop fence on 42 North Field. South Street Diamonds 06-09-26 There's a hole at the bottom wowhen a ball gets past the catcher, it keeps rolling out of play. Nck and Mike | Meaghan 06-01-26 Powerwash courts. 06-23-26 West Falls Courts Dan 06-02-26 replace flag. 06-04-26 South Street Park Jason-15 minutes Dan ? 06-02-26 Please repair fence on third base side of McDonald's 06-23-26 South Street Diamonds diamond. Nick, Jordan-Tightened bottom chain link. Need metal rails. Did one side, néed more. Done Erie County Sign Shop 06-03-26 no parking on grass sign ready. Please pick upand 06-10-26 install at Majors Park on the Hubbard side by the trail. Mike | Chris 06-04-26 Collect bagged up grass clippings from edge of road 06-05-26 South Street Park and put in our dumpster. Jason-.5 hours Page 1 07-08-26

Page 72

Caller Name/Address _ Date/Phone Notes Closed Nick 06-04-26 Remove sticks from drinking fountain area South Street Park by pool. 06-08-26 Jason Nick 06-04-26 remove debris and fix plow damage. West Falls Vet Park Nate, Ben 06-23-26 Nick 06:04:26 Replace the electric light under the flag. Repl West Falls Vet Park aced timer. Ants had gotten in and damaged the unit, The 06-08-26 flag spot light was also bad. It was replaced. Miké |. Karen 7 06-04-26 Put a trash caf out. Jason | 06-09-26 West Falls Tot Lot Mike | 06-04-26 Put garbage cans out at each baseball backstop. West Fall Part 06-09-26 Jason Mike | 06-08-26 Weed Wack around fences, buildings and softball oe West Falls Park 06-10-26 diamonds. Ben Dan 06-09-26 Line field for June 16th game for EA Baseball and 06-16-26 Parkdale Softball Field Softball. Jason-35 minutes Meaghan 06-09.26 Clean mouse poop out of building and make sura West Falls Building no 06-18-26 mice are left there. Jason-30 minutes Liz 06-11-26 Please post sign in path by entrance, _ Majors Park Hubbard entrance Liz. 06-18-26 | Mow Knox fence lines and parking lot, Weed wacking 06-16-26 Knox Park. was done last week. Jason Dan Please put more chalk in shed. Jason left 2 bagsin 06-15-26 South Streét Diamonds: shed, Mike 06-15-26: Chlorinators for pool are not working. Mike land Nate 06-15-26 South Street Park, replaced alll thtee parastolic pumps. 2.6 hours. Dan 06-15-26 Put hasp on for shed! door paddiock, 06-18-26 South Street Diamonds Mike-|-1 hour Nate and Mike | 06-18-26 Please fix-or change the hinge on the gitls changing 06-18-36 South Street Park-Pool room door at the pool. Mike | and Nate Resident 06-17-26 Rubber swing at Warren is broken. Please replace. 06-29-26. ‘Warren Park 6/23 ordered. 6/29 dane Mike | Train 06-17-26 Make sure there are garbages on all diamonds. West Falls Diamonds 06-17-26 Window facing pi¢klebail courtis cracked, West Falls Building Page 2 07-08-26

Page 73

Caller Name/Address Date/Phone Notes Cc losed Meaghan 06-17-26 Trim still needsto be done in WE building. New West Falls Building rope 07-22-26 needs to be attached to the garage door on shed. Garage door won't open all the way. Please fix, Mike-Door reset in track. 6/22, Window sells set and caulked, Chris 06-17-26 Please install the new chlotine and acid signs on South Street Park = Pool the 06-24-26 doors of the pool. The signs are at the rec office, Mike | Meaghan 06-18-26 Please drop a shop vac offto the Hamlin Park Réc. Hamlin Park 06-22-26 Buildingon Monday moming. She would like to borrow it for the day, Jason Mike 06-22-26 Meét Twinco at pool at 7AM to weld Spots. Mike +1 South Street Pool = 06-22-26 hour Meaghan - 06-22-26 refrigerator, freezer door jarimed. 06-22-26 Hamlin Park Mike | fixed. 1 hour Chris 06-24-26 The bathrooms are not opening up.inthe morning. 06-24-26 South Street Baseball Fields Please set timer earlier. Nick-reset Liz 06-24-26 Make sure pavillion is cleatied and garbage cans are south Street park Pavillion empty for party on 8/12/26. ; Chris 06-24-26 There is a small birthday party trom 4-3pm. Please South Street Park have someone. ernpty garbages and clean off tables after 3pm in preperation for the Aktion Club picnic. Please put 6ut an extra garbage can or two. They expect about 50 people for the pizze patty picnic and the garbages are usually overflowing by the time they are done. Dan 06-25-26 Bring2 bags of chalk to shed. They are out again. South Street Diamonds 06-25-26 Meaghan 06-25-26 Pickle ball courts are muddy again after thisheavy 07-02-26 West Falls Park rain. Please power wash pickleball and basketball court. There may be a drainage problem. Jason-1.5 hours Meaghan 06-29-26 Active wasp's nest in building by first aid kit. Please 06-29-26 west Falls Park Building remove asap. Mike 1 Meaghan 06-29-26 Cut off lock on storage cabinet. | 06-29-26 West Falls State Park Mike | Ken 06-29-26 Fix split rail fence. Knox Park Dave 06-30-26 Spread impact material at playgrounds in town parks. Page 3 07-08-26

Page 74

Caller Name/Address Date/Phone Notes | - Closed "Meaghan 06-30-26 Freezer in fridge in building does not seem to be West Falls Building working properly. Not cooling enough. Check 07-06-26 warrantee: Mike | purchased unit. Nick and Jordan switched unit. Karain-Rec Dept call from résident 06-30-26 Kayak launch is inaccessible: There is 15-20 fof mud Majors Park leading up to it and tree down. Looks washed out. | Meaghan 06-30-26 West Falls Building | Empty garbage and.¢leari/stock M-F until They start at 9AM. August 7th, Chris 06:30-26 Pool Stepto the diving board is broken 9026 Woinet's fiandi¢ap bathroom lock is broken Mike |-Installed new latch Total count: Pa rks AT Page 4 07-08-26

Back to the document