Text · page 10 of 74
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
CO FORMERLY FOIT-ALBERT ASSOCIATES RE: Brooklea Drive over Tannery Brook PIN 5765.46 Progress Report No. 13: May 30, 2026 through June 26, 2026 Achievements Updated all sections of the DAD. Advanced preliminary design and coordinated with the bridge design company Addressed environmental comments. e Held for a public meeting Scheduled Statement e The project is on schedule Budget Statement e On Budget. Planned For Next Month e Finalize the draft DAD and request final Design Approval Items Required e Nothing at this time. Very truly yours, Gerard J. Sentz, P.E. Vice President Foit-Albert Associates Eas a a 285 Main Stra. et, Suite ravens / Buffalo, NY 14.203 / TIG.G56 3933 Albacy 5 he r Read / Albany, NY 12205 / 518.452,1037 aOR V3 Wy $ta te Straeat, Sul 2 204 7 Ithaca, ae 14850 / 607, 288, 2088 tdant Ss Wast 94th Sereet, “Sur ite SIF / Nev w York, NY 30025 / 222.372.4813 Queene 89-31 let S! eet, Sul tw oO) Pam a, NY N432 / 733.374 3422 phia 123 S. Groad Street / 18th Floor / Philadelphia, PA 19109: