Southtowns Record

50 CENTER RIDGE-DRAWINGS

Government
Town of Aurora
Board
Town Board
Meeting
Jan 7, 2026
Kind
Other
Topics
Water, sewer and drainage, Zoning and land use, Budget and taxes, Parks and recreation, Energy and data center siting, Roads and traffic

Original document

Same meeting

Text · page 14 of 17

Read the whole document on one page (all 17 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Short Environmental Assessment Form
  Part I - Project Information

Instructions for Completing

Part 1 — Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as
thoroughly as possible based on current information.

Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the
lead agency; attach additional pages as necessary to supplement any item.

 Part 1 — Project and Sponsor Information
Empire Solar Solutions LLC

 Name of Action or Project:
Roof mounted Solar System
 Project Location (describe, and attach a location map):
50 Center Ridge Rd. East Aurora, NY 14052
 Brief Description of Proposed Action:
 New installation for a 32.19 kW roof mounted solar array. 74 Hyundai 435 W panels w/ 2 Tesla Powerwall 3 Inverters.

 Name of Applicant or Sponsor:  Telephone:  (45) 317-8019

 Courtney Roberts  from Empire Solar Solutions LLC  E-Mail:  [email protected]

 Address:
 2-8 Johnes St.
  City/PO:  State:  Zip Code:
 Newburgh,  _|NY  12550
  1.  Does the proposed action only involve the legislative adoption of a plan, local law, ordinance,  NO  YES
  administrative rule, or regulation?
  If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that  [|
  may be affected in the municipality and proceed to Part 2. Ifno, continue to question 2.
  2. Does the proposed action require a permit, approval or funding from any other government Agency?  NO  YES
  If Yes, list agency(s) name and permit or approval:

  3.  a. Total acreage of the site of the proposed action?  +1535  acres
  b. Total acreage to be physically disturbed?  ©  acres
  c. Total acreage (project site and any contiguous properties) owned
  or controlled by the applicant or project sponsor?  185  acres

  4,  Check all land uses that occur on, are adjoining or near the proposed action:
  5.  [-] Urban  []  Rural (non-agriculture)  [-]  Industrial  [|]  Commercial  Residential (suburban)
  [J Forest  [[] Agriculture  ["] Aquatic  [_]  Other(Specify):
  [_] Parkland

  Page | of 3