Text · page 14 of 17
Read the whole document on one page (all 17 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Short Environmental Assessment Form Part I - Project Information Instructions for Completing Part 1 — Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency; attach additional pages as necessary to supplement any item. Part 1 — Project and Sponsor Information Empire Solar Solutions LLC Name of Action or Project: Roof mounted Solar System Project Location (describe, and attach a location map): 50 Center Ridge Rd. East Aurora, NY 14052 Brief Description of Proposed Action: New installation for a 32.19 kW roof mounted solar array. 74 Hyundai 435 W panels w/ 2 Tesla Powerwall 3 Inverters. Name of Applicant or Sponsor: Telephone: (45) 317-8019 Courtney Roberts from Empire Solar Solutions LLC E-Mail: [email protected] Address: 2-8 Johnes St. City/PO: State: Zip Code: Newburgh, _|NY 12550 1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES administrative rule, or regulation? If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that [| may be affected in the municipality and proceed to Part 2. Ifno, continue to question 2. 2. Does the proposed action require a permit, approval or funding from any other government Agency? NO YES If Yes, list agency(s) name and permit or approval: 3. a. Total acreage of the site of the proposed action? +1535 acres b. Total acreage to be physically disturbed? © acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? 185 acres 4, Check all land uses that occur on, are adjoining or near the proposed action: 5. [-] Urban [] Rural (non-agriculture) [-] Industrial [|] Commercial Residential (suburban) [J Forest [[] Agriculture ["] Aquatic [_] Other(Specify): [_] Parkland Page | of 3