Southtowns Record

612 BUFFALO-SURVEY

Government
Town of Aurora
Board
Town Board
Meeting
Apr 1, 2026
Kind
Other
Topics
Water, sewer and drainage, Zoning and land use, Budget and taxes, Parks and recreation

Original document

Same meeting

Text · page 1 of 3

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Short Environmental Assessment Form
  Part 1 - Project Information

  Instructions for Completing

Part 1 ~ Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
  Part | based on
application for approval or finding, are subject to public review, and may be subject to further verification, Complete
  information currently available. If additional research or investigation would be needed to fully respond te any item, please answer as
thoroughly as possible based on current information.

Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the
lead agency: attach additional pages as necessary to supplement any item.

  Part 1 — Project and Spo a Information
  ‘\ \\age  Yeu,
  Name of Action or Project:

  Project Location aeVitlaoe Pla  and attaach
  locatfon map):  .

  V i l a g e
  a,

  __—  (oi? “Botkalo  el fasr Antone ~s 40D.
  ~k

  Sans
  n
  wc
  a
  of Proposed Action
  xp
  yr
  r
  as
  a y
  eC o v r y e r a n d open
  pote o  ON
  Oy, (VV
  QUE RenY
  Name of Applicant or Sponsor:  Telephone: #/ 7) Se Li}  7  | SSS

  Casey waCar
  Radress: IO5
  drers  Emir OSOY@ VIAGe-P!o
  lnu  t  a

  4O52
  Zip ‘ode:
  NY
  :  |  State:
  Avorn
  pr  Aa)
  Easy
  CityPO:

  |.  Does the proposed action only involve the legislative adoption of a plan, local law, ordinance,  NO
  administrative rule, or regulation?
  if Yes, attach a narrative description of the intent of the proposed action and the environmental resources that  |
  may be affected in the municipality and proceed to Part 2. Ifno, continue to question 2.
  3. Does the proposed action require a permit, approval or funding from any other government Agency?  \  NO
  :
  | Hf Yes, list ageney(s) name and permit or approval:
  TOU B08VG,,ime \@AP acresprNe*  1
  3.  a. Total acreage  of the site of the proposed action?
  b. Total acreage to be physically disturbed?  __o  _ acres
  c. Total acreage (project site and any contiguous properties) owned
  vr controlled by the applicant or project sponsor?  \. Ag _. Beres
  (4A

  4.  Check all land uses  that occur on, are adjoining or near the proposed action:
  [~] Urban  tun  (non-agriculture)  (_]  Industrial  me Commercial  is Residential (suburban)
  [J Forest  [C1] Agriculture  ["] Aquatic  [T] O8 her(Specify):
|  62] Parkland

  Pape
  ).
  dads"oS
  «» i
  SEAF 2049