Short Environmental Assessment Form
  Part I - Project Information

Instructions for Completing

Part 1 — Project Information.  The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as
thoroughly as possible based on current information.

Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the
lead agency; attach additional pages as necessary to supplement any item.

prpoers and Gannifer OOM)
 Part 1 — Project and Sponsor Information

 Name of Action or  Project:

  u9
 Redd EMO,  ior “pot
 Project Location (describe, and attach a location map):

  BSA Sous os. eact Avmm  OM
 Brief Description of Proposed Action:

 Spang boen LKIStUG Concrcky dad oud
  Ne OO)  ho  DARS  OL ROAD

 Name of Applicant or Sponsor:  Telephone: ~|\ly- 6007 “1035
  :
Avior  % Qenindin VA teuman  — Mioray man" &) Onan7
  E-Mail:
  I  t
  Address:

  E54 Dos  Gv
  City/PO: a  QoKoren  State: pou  Zip \Ao  SO.

  1.  Does the proposed action only involve the legislative adoption of a plan, local law, ordinance,  YES
  administrative rule, or regulation?
  If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that  E4  |
  may be affected in the municipality and proceed to Part 2. If no, continue to question 2.
  2. Does the proposed action require a permit, approval or funding from any other government Agency?  NO  YES
  If Yes, list agency(s) name and permit or approval:  |  ,  3
  TWA  build  Oot  + |
  3.  a. Total acreage of the site of the proposed action?  4  acres
  b. Total acreage to be physically disturbed?  1D Sa&4 acres
  c. Total acreage (project site and any contiguous properties) owned
  or controlled by the applicant or project sponsor?  » Ab _ acres

  4.  Check all land uses that occur on, are adjoining or near the proposed action:
  [] Urban  [J  Rural (non-agriculture)  LJ  Industrial  [_]  Commercial rae Residential (suburban)
  [-] Forest  [[] Agriculture  [_] Aquatic  [_]  Other(Specify):
  [| Parkland

  Page | of 3  SEAF 2019