Text · page 7 of 8
Read the whole document on one page (all 8 pages, each with its own heading)
12th Town Board Meeting 06/17/2026 Page 7 WHEREAS, the Town Board does hereby approve the following resolution upon the recommendation of the Planning Board from their June 11, 2026 meeting: RESOLVED, with regard to P. B. File #10-26, 3392 North Benzing Road, located on the West side of North Benzing Road, north of Amanda Lane, Zoned_B-1. (SBL# 152.18-1-1). The Town Board approves the presented Site Plan, received 6/10/26 and authorizes a Building Permit, for construction of a 10,000 square foot accessory building to store items for the maintenance of Quaker Crossing Plaza, based on the following conditions and stipulations: 1. All public notices have been filed. 2. This is an Unlisted Action, based on the Short EAF submitted 5/28/26, and a Negative Declaration is made. 3. The site lighting is limited to those fixtures and poles indicated on the approved Site Plan. Light fixtures shall have flat lenses and all lighting is to be directed downward and toward the site. 4. No outside storage or display is permitted. 5. Any future dumpsters shall be screened, in accordance with Section 144-25 of the Town Code. 6. The Landscaping Value Estimate of $21,615.00 requires a Certified Check amounting to 50% of the total shall be deposited with the Town Clerk prior to receiving a Building Permit ($10,807.50). 7. The Applicant is to provide the Town of Orchard Park Assessor with an “independent” appraisal for the completed project by a Certified Commercial Appraiser. 8. A GML 239n referral was submitted to the ECDEP on 5/28/26. Comments were received on 6/1/26. No recommendation was made. 9. The Site Plan dated 06/10/26 has been determined by the Building Inspector to be Compliant as presented. 10. Town Engineering approval was granted on 6/11/26. The resolution was unanimously adopted. BUSINESS FROM THE FLOOR Mary Chase spoke of the petition submitted regarding Bieler Road speed humps. She asked for the board to evaluate the home addresses of the petitioners that signed it. Julia Hora Doersam spoke of drainage problems on Cole Rd. ELECTED OFFICIALS & DEPARTMENT MANAGERS Supervisor Joseph Liberti welcomed the newly hired employees. Councilmember Julia Mombrea stated there is no plan at this moment to remove the speed humps on Bieler Rd. Councilmember John Mariano encouraged people to attend the Rotary Club’s Fishing Derby at Green Lake. Town Engineer Wayne Bieler spoke of the grading done at 6095 Cole Rd.