4th Town Board Meeting  02/18/2026  Page 2

RESOLVED, that the Town board does hereby approve the appointment of Emily F. Nowak to the position
of Police Officer in the Orchard Park Police Department (pending civil service approval), Step 2, effective
February 28, 2026, as recommended by the interim Chief of Police.

  The resolution was unanimously adopted.

New Business #3 Award contract to Legend Excavating LLC Corp for the Dennis Road Culvert
Replacement Project.

4) THE FOLLOWING RESOLUTION WAS OFFERED BY COUNCILMEMBER HONER, WHO
MOVED ITS ADOPTION, SECONDED BY COUNCILMEMBER BENNETT, TO WIT:

WHEREAS, bids were opened for the Dennis Road Culvert Replacement Project on January 27, 2026. The
project consists of total reconstruction/replacement of the existing concrete culvert, relocation of sanitary
sewers, roadway realignment, and restoring of the roadway section accordingly; and

WHEREAS, the project was bid on a unit price basis for the associated culvert, sanitary sewer, creek
embankment, and road realignment and restoration work items. The Engineering Department and C & S
Consultant Engineers reviewed itemized bid prices of the four contractors who submitted bids, including
comparing them in relation to the Engineer's estimate of $1,389,000.00. The lowest responsible bidder was
Legend Excavating LLC with a Bid amount of $ 1,039,113.00; and

WHEREAS, there is an extended tabulation of bid results showing the itemized bid amounts from each
bidder. Contractor submissions were checked for math errors. JMM Construction of WNY had acknowledged
receiving Addendum #3, but did not use the revised bid tabulation sheets which included updated quantities
for bid items additional and deletion of bid items. Therefore, after consultation with our Town Attorney, their
bid was rejected; and

WHEREAS, the Town received a $1,000,000.00 grant for this project; currently the project expenditure is in
the amount of $188,000.00 for Engineering Design Consulting Services by C & S Engineers. The bid results
determined an additional $38,113.00 is required for construction. The construction inspection and
administration contract awarded to C & S Engineers, as required per N.Y.S., equated to $189,000.00 as
previously approved by the Town Board. This results in an additional $416,113.00 needed for the Capital
Project Account DB015, Dennis Road Bridge; and

WHEREAS, Legend Excavation LLC has successfully completed various storm sewer, water, sanitary
sewer, and road reconstruction projects in the past. Including Acorn Circle Pond drudging for the Town of
Orchard Park. The contractor provided references on relevant experience and all reference checks gave
positive comments.

NOW, THEREFORE be it

RESOLVED, that the Town Board does hereby authorize the additional pulldown of $416,113.00 for the
Capital Project Account DB015, Dennis Road Bridge Replacement; and be it further

RESOLVED, that the Town Board does hereby award the contract for the Dennis Road Culvert Replacement
Project to the lowest responsible bidder, Legend Excavating LLC, 8080 Barnum Road, Cassadaga, New York
14718 in the amount not to exceed $1,039,113.00, as recommended by the Town Engineer.

  The resolution was unanimously adopted.

New Business #4 Approve the application to the Greater Buffalo Region Transportation Council
(GBNRTC) Regional Bike Master Plan Grant.