Southtowns Record

Supporting Documentation

Government
Town of Orchard Park
Board
Town Board
Meeting
Jul 1, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Public safety

Original document

Same meeting

Text · page 2 of 6

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

LaBella
  Powered by partnership.
  Page sof

June 24, 2026

Via Email: [email protected]

Wayne Bieler P.E. CFM
Town Engineer
4295 South Buffalo Street
Orchard Park N.Y, 14127

Project: Phase ll Rezoning District Legal Descriptions (MNU, BC, RS)

  Scope of Services

LaBella will prepare Legal Descriptions for the newly created NMU, BC, and RS zoning districts as
shown on the exhibit attached to this proposal.

Draft legal descriptions will be submitted to the Town for review prior to finalization. Following review
  t
and incorporation of comments, final legal descriptions will be provided as one (1) PDF file and five (5)
hard copies stamped and signed by a licensed Professional Land Surveyor.  .

To ensure continuity between zoning district boundaries and compliance with Town Surveyor
requirements, supporting legal documents such-as deeds for adjoining properties, road rights-of-
way, and municipal boundary descriptions may be required. These documents will be obtained by
LaBella and billed as a reimbursable expense in addition to the lump-sum fee below. If there are
major changes to the scope of work or there are a significant number of revisions, LaBella will
provide a request for additional fee.

Schedule: drafting of the legal descriptions will begin within 2 weeks of notice to proceed, a first
draft for review will be available 1 week after beginning. Final delivery will be made within 1 week of
the last revisions/comments by the Town Surveyor.

FEE: $9,000 (lump sum)

If this proposal is acceptable, please sign and return one (1) copy along with the requested lump sum
fee. Receipt of the executed proposal and payment will authorize us to proceed with the services
described. This proposal is valid for 30 days from the date hereof.

CABK  6/24/2026
  Orchard Park  Date
Jacob Griffis, LS
Survey Manager
LaBella Associates
  Title