E_App E_Post-Development Model  NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates  Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC  Page 12

  Summary for Subcatchment PS-7:

Runoff  =  2.49 cfs @ 12.17 hrs, Volume=  0.215 af, Depth= 0.46"
  Routed to Reach DP-1 : Design Point

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"

  Area (sf)  CN  Description
  245,856  80  >75% Grass cover, Good, HSG D
  245,856  100.00% Pervious Area

  Tc Length Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec) (cfs)
  8.5  100 0.0450  0.20  Sheet Flow,
  Grass: Short n= 0.150 P2= 2.20"
  5.3  271 0.0148  0.85  Shallow Concentrated Flow, SCF
  Short Grass Pasture Kv= 7.0 fps
  0.2  20 0.1500  1.94  Shallow Concentrated Flow, SCF
  Woodland Kv= 5.0 fps
  14.0  391 Total

  Subcatchment PS-7:
  Hydrograph

  Runoff
  2.49 cfs
  NY-West Seneca 24-hr S1 1-yr
  Rainfall=1.82"
  2
  Runoff Area=245,856 sf
  Runoff Volume=0.215 af
  Runoff Depth=0.46"
  Flow (cfs)

  Flow Length=391'
  Tc=14.0 min
  1
  CN=80

  0
  0  2 4  6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
  Time (hours)

  Page 208 of 849