Text · page 286 of 849
Read the whole document on one page (all 849 pages, each with its own heading)
BR Drainage Area Look for areas that are uphill from the Bioretention cell. Problem (Check if Present) Follow-Up Actions Kick-Out to Level 2 Inspection: Large areas of soil have been eroded, or larger channels are forming. May require rerouting of flow paths. Piles of grass Remove or cover piles of grass clippings, clippings, mulch, mulch, dirt, etc. dirt, salt, or other materials Other: Cover or properly dispose of materials; consult your Open containers local solid waste authority for guidance on materials of oil, grease, that may be toxic or hazardous. paint, or other substances Other: Page 2 of 8 Page 286 of 849