Southtowns Record

PBA06.11.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jun 11, 2026, 6:00 p.m.
Posted by publisher
Jun 3, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 483 of 849

Read the whole document on one page (all 849 pages, each with its own heading)

Node 3 – Orchard Park Rd & Fairfax (48”):

Existing Peak Flow measured (wet weather event)  = 14.470 cfs (9.352 mgd)*
Proposed Apartments Peak Flow (Flattery’s)  = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road)  = 0.046 cfs**
Proposed Total Peak Flow  = 14.581 cfs

Existing Peak Flow measured (overall)  = 16.150 cfs (10.438 mgd)*
Proposed Apartments Peak Flow (Flattery’s)  = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road)  = 0.046 cfs**
Proposed Total Peak Flow  = 16.261 cfs

Theoretical capacity of existing 48” pipe @ 0.15% = 60.218 cfs

Conclusion: The proposed total peak flow is less than the capacity of the 48” pipe, therefore there is sufficient
capacity. At no time during the monitoring period did flow depth exceed the pipe diameter at Node 3 of the
downstream monitoring points during the rain events monitored.

Foot Notes:

Downstream capacity node information provided by Town of West Seneca
*Converted from measurements in TECSmith report dated 9/15/22 & 4/19/22
** See Sanitary Sewage Demand Calculations

Proposed Apartments
10/3/2022
Page 2 of 2

  Page 483 of 849