Southtowns Record

PBA06.11.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jun 11, 2026, 6:00 p.m.
Posted by publisher
Jun 3, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 488 of 849

Read the whole document on one page (all 849 pages, each with its own heading)

CARMINA WOOD DESIGN  Project No.:  22.128  Date:  10/3/2022
  487 MAIN STREET, SUITE 500  Project Name:  Residential Apartments
  BUFFALO, NEW YORK, 14203  Project Address: 1130 Orchard Park Road  West Seneca, NY
  (716) 842-3165  Subject:  Sanitary Sewer Demand Calcs
  FAX (716) 842-0263  Sheet:  1  of  1

Sanitary Sewage Demand Calculations:

  Proposed Apartments

  220 gal/d/unit  x  45 units  =  9,900  gpd  *use 220 gallons per unit per day (2-bdrm)

  Total Site Sanitary Demand:  =  9,900  gpd

Find Peak Sanitary Demand:

  Peaking Factor based on Population:
  Total demand:  9,900 gpd  /  100 gpcd  =  99 per capita

  Population (P)  =  99 people

  Peaking Factor : (18 +ÖP) / (4 + ÖP )  where P is in thousands

  Peaking Factor =  4.24

  Peak Sanitary Demand  =  9,900 x  4.24  =  42,023 gpd
  =  0.042 MGD
  =  0.065 cfs

Required Infiltration and Inflow Mitigation:

  Peak Sanitary Flow  =  42,023 gpd  =  29.18 gpm

  4:1 offset flow per NYSDEC requirements  =  29.18 x  4  =  116.73 gpm req'd

  Mitigation Credit  =  30  gpm / lateral

  Laterals to be replaced*  =  3.9  laterals
  =  4  laterals  *(or other mitigation as identified by the Town)

  From DSCA for Multi-family project
  at 1130 Orchard Park Road

  Page 488 of 849