Text · page 494 of 849
Read the whole document on one page (all 849 pages, each with its own heading)
• Level and Pipe Size 10 20 30 40 50 60 70 0 17-Aug-22 18-Aug-22 19-Aug-22 19-Aug-22 TECsmith 20-Aug-22 21-Aug-22 22-Aug-22 22-Aug-22 23-Aug-22 24-Aug-22 25-Aug-22 26-Aug-22 26-Aug-22 27-Aug-22 28-Aug-22 Level 29-Aug-22 29-Aug-22 30-Aug-22 Node 2 31-Aug-22 1-Sep-22 2-Sep-22 Pipe Size 2-Sep-22 3-Sep-22 water and wastewater monitoring specialists 4-Sep-22 5-Sep-22 6-Sep-22 6-Sep-22 7-Sep-22 8-Sep-22 9-Sep-22 9-Sep-22 10-Sep-22 11-Sep-22 One time during the monitoring period did depth of flow exceed pipe diameter at Node 2. 12-Sep-22 13-Sep-22 13-Sep-22 PO Box 95 Clarence, NY 14031 TECSMITH, Inc. Tel: 716-462-0382 Page 494 of 849