Calculate Water Quality Volume Is this project subject to Section 4.3 of the NYS Design Manual for Enhanced Phosphorus Removal? No What is the nature of this construction project? New Construction Design Point: 1 Enter 90% Rainfall Event as P P= 1.00 inches Calculate Required WQv Contributing Percent Drainage Area Impervious Area WQv SMP Area Impervious Rv Number (Acres) (cf) Description (Acres) % Filtration 1 3.66 1.89 52 0.51 6,839 Bioretention Filtration 2 2.16 1.07 50 0.50 3,888 Bioretention 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Total 5.82 2.96 51 0.51 10727 Required WQv Page 501 of 849