Southtowns Record

PBA06.11.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jun 11, 2026, 6:00 p.m.
Posted by publisher
Jun 3, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 553 of 849

Read the whole document on one page (all 849 pages, each with its own heading)

23-4121 storm calcs - Proposed  Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design  Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC  Page 31

  Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
  Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
  Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method

Subcatchment 1S: Proposed - North  Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=3.99"
  Flow Length=738' Tc=24.8 min CN=89 Runoff=13.94 cfs 53,068 cf

Subcatchment 2S: Proposed - South  Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=3.99"
  Flow Length=627' Tc=19.8 min CN=89 Runoff=9.33 cfs 31,254 cf

Subcatchment 3S: Direct  Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=3.09"
  Flow Length=58' Tc=7.8 min CN=80 Runoff=2.52 cfs 5,604 cf

Pond 1P: Detention Pond  Peak Elev=674.73' Storage=34,966 cf Inflow=22.95 cfs 84,322 cf
  Outflow=3.45 cfs 84,322 cf

  Total Runoff Area = 275,173 sf Runoff Volume = 89,926 cf Average Runoff Depth = 3.92"
  53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf

  Page 553 of 849