6.  All inspection reports shall be signed by the qualified inspector. Pursuant to Part II.C.2 of the
  General Permit, the inspection reports shall be maintained on site with the SWPPP.

  Record Retention - The owner or operator shall retain a copy of the NOI, NOI Acknowledgment Letter,
  SWPPP, MS4 SWPPP Acceptance form and any inspection reports that were prepared in conjunction with
  this permit for a period of at least five (5) years from the date that the site achieves final stabilization.
  This period may be extended by the Department, in its sole discretion, at any time upon written
  notification.

I.  SWPPP MODIFICATIONS: The inspection report should also identify if any revisions to the SWPPP are
  warranted due to unexpected conditions. The SWPPP is meant to be a dynamic working guide that is to
  be kept current and amended whenever there is a change in design, construction, operation, or
  maintenance at the construction site that has or could have a significant effect on the discharge of
  pollutants or when the plan proves to be ineffective in eliminating or significantly minimizing pollutant
  discharges. The Contractor’s failure to modify or report deficiencies to the Operator will result in the
  Contractor being liable for fines and construction delays resulting from any federal, state, or local agency
  enforcement action.

J.  FINAL STABILIZATION AND TERMINATION OF PERMIT COVERAGE: A site can be considered finally
  stabilized when all soil disturbing activities have been completed and a uniform perennial vegetative
  cover with a density of 85% for the unpaved areas and areas not covered by permanent structures has
  been established or equivalent permanent stabilization measures have been established and the facility
  no longer discharges storm water associated with construction activities and a Notice of Termination
  (NOT) form filed by the Operator(s) with the NYSDEC. The Operator’s Project Manager must complete the
  NOT. The NOT must be signed by the signatory (or equivalent position) on the NOI and subsequently
  submitted to the appropriate agency. The Operator’s Project Manager must provide a completed copy of
  the NOT to the Contractor for inclusion in the SWPPP, which will then be optically scanned into the final
  SWPPP document as required. This filing terminates coverage under the General Permit and terminates
  the Contractor’s responsibility to implement the SWPPP, but the requirements of the SWPPP, including
  periodic inspections, must be continued until the NOT is filed. The owner or operator shall also have the
  qualified inspector perform a final site inspection prior to submitting the NOT to the Department. Final
  payment and/or the release of retainage will be withheld until all provisions of the SWPPP have been
  submitted, completed and accepted by the Operator.

102  PROJECT NAME AND LOCATION

  Multifamily Development

  1425 & 1475 Orchard Park Road

  Town of West Seneca, County of Erie, New York

  Easting: 192275

  Northing: 4746778

  Estimated Area of Site ≈ 16.59 acres

  Estimated Area to be disturbed by Construction Activities ≈ 7.37 acres

  A general location map is included as Appendix A.

103  OPERATOR’S NAME AND ADDRESS

  Brian Hillery & William Sahlem

Multifamily Development
5/26/26
Page 8 of 23