107  INDIAN COUNTRY LANDS

  This project is not located on Indian Lands.

108  ENDANGERED AND THREATENED SPECIES

  No endangered or threatened species have been determined to be on the site.

109  CRITICAL HABITAT

  See section 108 above.

110  HISTORIC PLACES

  The assessed property is shown on the NYSHPO map as an archeologically sensitive area. A Phase I
  Cultural Resource Investigation Report was prepared for the site.

  Refer to Appendix K for OPRHP Clearance Letter

111  WETLANDS AND/OR OTHER SURFACE WATERS

  Approximately 5.60 acres of USACE wetlands were delineated on site. The proposed development will not
  encroach on nor disturb the wetlands.

  Refer to Appendix J for Wetland Delineation Figure: by LaBella

112  EROSION AND SEDIMENT CONTROLS

  112.1  STABILIZATION PRACTICES

  Stabilization practices for this site include:

  A.  Land clearing activities shall be done only in areas where earthwork will be performed and shall
  progress as earthwork is needed.

  B.  Use of stabilization method for all slopes having a slope greater than 1V:3H.

  C.  Permanent seeding and planting of all unpaved areas using the hydromulching grass seeding
  technique.

  D.  Mulching exposed areas.

  E.  Vegetation preservation in undisturbed areas.

  F.  Frequent watering to minimize wind erosion during construction.

  a.  For sites where 5 acres or more are disturbed at any one time: In areas where soil
  disturbance activity has been temporarily or permanently ceased, temporary and/or
  permanent soil stabilization measures shall be installed and/or implemented within
  seven (7) days from the date the soil disturbance activity ceased. The soil stabilization
  measures selected shall be in conformance with the most current version of the New
  York Standards and Specifications for Erosion and Sediment Control.

  b.  The owner or operator shall prepare a phasing plan that defines maximum disturbed
  area per phase and shows required cuts and fills.

Multifamily Development
5/26/26
Page 10 of 23

  Page 576 of 849