Southtowns Record

PBA06.11.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jun 11, 2026, 6:00 p.m.
Posted by publisher
Jun 3, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 581 of 849

Read the whole document on one page (all 849 pages, each with its own heading)

C.  Any spills of hazardous materials which are in excess of the Reportable Quantities as defined by
  the EPA regulations shall be immediately reported to the EPA National Response Center at 1-100-
  424-1102. From SWPPP-9 “Reportable Quantity Release Form” must be filled out.

  D.  In order to minimize the potential for a spill of hazardous materials to come in contact with
  storm water, the following steps will be implemented:

  1.  All materials with hazardous properties (such as pesticides, petroleum products,
  fertilizers, detergents, construction chemicals, acids, paints, paint solvents, cleaning
  solvents, additives for soil stabilization, concrete curing compounds and additives, etc.)
  will be stored in a secure location, under cover, when not in use.

  2.  The minimum practical quantity of all such materials will be kept on the job site.

  3.  A spill control and containment kit (containing for example, absorbent such as kitty
  litter or sawdust, acid neutralizing powder, brooms, dust pans, mops, rags, gloves,
  goggles, plastic and metal trash containers, etc.) will be provided at the storage site.

  4.  All of the product in a container will be used before the container is disposed of. All
  such containers will be triple rinsed with water prior to disposal. The rinse water used
  in these containers will be disposed of in a manner in compliance with state and federal
  regulations and will not be allowed to mix with storm water discharges.

  5.  All products will be stored in and used from the original container with the original
  product label.

  6.  All products will be used in strict compliance with instructions on the product label.

  7.  The disposal of excess or used products will be in strict compliance with instructions on
  the product label.

  113.8  CONTAMINATED SOILS

  A.  Any contaminated soils (resulting from spills of materials with hazardous properties) which may
  result from construction activities will be contained and cleaned up immediately in accordance
  with the procedures given in the Spill Prevention Control and Countermeasures (SPCC) Plan and
  in accordance with applicable state and federal regulations.

  B.  The job site superintendent will be responsible for seeing that these procedures are followed.

114  COMPLIANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS

  The Contractor will obtain copies of any and all local and state regulations which are applicable to storm
  water management, erosion control, and pollution minimization at this job site and will comply fully with
  such regulations. The Contractor will submit written evidence of such compliance if requested by the
  Operator or any agent of a regulatory body. The Contractor will comply with all conditions of the SPDES
  General Permit for Construction Activity for the State of New York, including the conditions related to
  maintaining the SWPPP and evidence of compliance with the SWPPP at the job site and allowing
  regulatory personnel access to the job site and to records in order to determine compliance.

  The SWPPP for this site development project requires regulated MS4 approval from the Town of West
  Seneca. All changes to the SWPPP must be approved by the Town of West Seneca prior to applying
  changes to the SWPPP in the field.

Multifamily Development
5/26/26
Page 15 of 23

  Page 581 of 849