Text · page 581 of 849
Read the whole document on one page (all 849 pages, each with its own heading)
C. Any spills of hazardous materials which are in excess of the Reportable Quantities as defined by the EPA regulations shall be immediately reported to the EPA National Response Center at 1-100- 424-1102. From SWPPP-9 “Reportable Quantity Release Form” must be filled out. D. In order to minimize the potential for a spill of hazardous materials to come in contact with storm water, the following steps will be implemented: 1. All materials with hazardous properties (such as pesticides, petroleum products, fertilizers, detergents, construction chemicals, acids, paints, paint solvents, cleaning solvents, additives for soil stabilization, concrete curing compounds and additives, etc.) will be stored in a secure location, under cover, when not in use. 2. The minimum practical quantity of all such materials will be kept on the job site. 3. A spill control and containment kit (containing for example, absorbent such as kitty litter or sawdust, acid neutralizing powder, brooms, dust pans, mops, rags, gloves, goggles, plastic and metal trash containers, etc.) will be provided at the storage site. 4. All of the product in a container will be used before the container is disposed of. All such containers will be triple rinsed with water prior to disposal. The rinse water used in these containers will be disposed of in a manner in compliance with state and federal regulations and will not be allowed to mix with storm water discharges. 5. All products will be stored in and used from the original container with the original product label. 6. All products will be used in strict compliance with instructions on the product label. 7. The disposal of excess or used products will be in strict compliance with instructions on the product label. 113.8 CONTAMINATED SOILS A. Any contaminated soils (resulting from spills of materials with hazardous properties) which may result from construction activities will be contained and cleaned up immediately in accordance with the procedures given in the Spill Prevention Control and Countermeasures (SPCC) Plan and in accordance with applicable state and federal regulations. B. The job site superintendent will be responsible for seeing that these procedures are followed. 114 COMPLIANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS The Contractor will obtain copies of any and all local and state regulations which are applicable to storm water management, erosion control, and pollution minimization at this job site and will comply fully with such regulations. The Contractor will submit written evidence of such compliance if requested by the Operator or any agent of a regulatory body. The Contractor will comply with all conditions of the SPDES General Permit for Construction Activity for the State of New York, including the conditions related to maintaining the SWPPP and evidence of compliance with the SWPPP at the job site and allowing regulatory personnel access to the job site and to records in order to determine compliance. The SWPPP for this site development project requires regulated MS4 approval from the Town of West Seneca. All changes to the SWPPP must be approved by the Town of West Seneca prior to applying changes to the SWPPP in the field. Multifamily Development 5/26/26 Page 15 of 23 Page 581 of 849