Part I.B. B. Types of Discharges Authorized 1. The following stormwater discharges are authorized under this permit: a. Stormwater discharges, including stormwater runoff, snowmelt runoff, and surface runoff and drainage, associated with construction activity, are authorized under this permit provided that appropriate stormwater controls are designed, installed, and maintained in accordance with Part II. and Part III. b. Stormwater discharges from construction support activities at the construction site (including concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, and borrow areas) if the following requirements are met: i. The support activity is directly related to the construction site required to have permit coverage for stormwater discharges; and ii. The support activity is not a commercial operation, nor does it serve multiple unrelated construction sites; and iii. The support activity does not continue to operate beyond the completion of the construction activity at the site it supports; and iv. Stormwater controls are implemented in accordance with Part II. and Part III. for discharges from the support activity areas. 2. The following non-stormwater discharges associated with construction activity are authorized under this permit: a. Non-stormwater discharges listed in 6 NYCRR 750-1.2(a)(29)(vi), with the following exception: “Discharges from firefighting activities are authorized only when the firefighting activities are emergencies/unplanned”; and b. Non-stormwater discharges of waters to which other components have not been added that are used in accordance with the SWPPP to control dust or irrigate vegetation in stabilized areas; and c. Uncontaminated discharges from dewatering operations 9 Page 715 of 849