Appendix A

Construction Activity(ies) – identified within 40 CFR 122.26(b)(14)(x),
122.26(b)(15)(i), and 122.26(b)(15)(ii), any clearing, grading, excavation, filling,
demolition or stockpiling activities that result in soil disturbance. Clearing activities can
include, but are not limited to, mechanized logging equipment operation, the cutting and
skidding of trees, stump removal and/or brush root removal.

Construction activity does not include routine maintenance that is performed to maintain
the original line and grade, hydraulic capacity, or original purpose of a facility, which is
excluded from the calculation of the soil disturbance for a project. Routine maintenance
includes, but is not limited to:

   Re-grading of gravel roads or parking lots; and
   Cleaning and shaping of existing roadside ditches and culverts that maintains
  the approximate original line and grade, and maintains or improves the
  hydraulic capacity of the ditch; and
   Replacement of existing culverts that maintains the approximate original line
  and grade, and maintains or improves the hydraulic capacity of a ditch; and
   Replacement of existing bridges that maintains the approximate original line
  and grade, and maintains or improves the hydraulic capacity beneath the
  bridges; and
   Cleaning and shaping of existing roadside ditches that does not maintain the
  approximate original grade, hydraulic capacity and purpose of the ditch if the
  changes to the line and grade, hydraulic capacity or purpose of the ditch are
  installed to improve water quality and quantity controls (e.g. installing grass
  lined ditch); and
   Placement of aggregate shoulder backing that stabilizes the transition between
  the road shoulder and the ditch or embankment; and
   Full depth milling and filling of existing asphalt pavements, replacement of
  concrete pavement slabs, and similar work that does not expose soil or disturb
  the bottom six (6) inches of subbase material; and
   Long-term use of equipment storage areas at or near highway maintenance
  facilities; and
   Removal of sediment from the edge of the highway to restore a previously
  existing sheet-flow drainage connection from the highway surface to the
  highway ditch or embankment; and
   Existing use of Canal Corp owned upland disposal sites for the canal, and
   Replacement of curbs, gutters, sidewalks and guide rail posts; and
   Maintenance of ski trails including brush hog use and mowing; and
   Above ground snowmaking pipe replacement; and
   Replacement of existing utility poles; etc.

Construction Site – the land area where construction activity(ies) will occur. See also
the definitions for “Commence (Commencement of) Construction Activities” and
“Common Plan of Development or Sale.”
  57

  Page 763 of 849