Appendix B Table 2 (Continued) CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP THAT INCLUDES POST-CONSTRUCTION STORMWATER MANAGEMENT PRACTICES (SMPS) The following construction activities: • Permanent laydown yards and equipment storage lots • Playgrounds that include the construction or reconstruction of impervious area • Sports complexes • Racetracks; includes racetracks with earthen (dirt) surfaces • Road construction or reconstruction, outside the municipal boundaries of NYC • Road construction within the municipal boundaries of NYC • Stand-alone road reconstruction, within the municipal boundaries of NYC where the total soil disturbance from that road reconstruction involves soil disturbance of one (1) acre or more of land • Parking lot construction or reconstruction (as with all Table 2 bullets, this includes parking lots constructed as part of the construction activities listed in Table 1, unless a Table 1 bullet specifies otherwise) • Athletic fields (natural grass) that include the construction or reconstruction of impervious area (>5% of disturbed area) or alter the hydrology from pre- to post-development conditions • Athletic fields with artificial turf • Permanent access roads, parking areas, substations, compressor stations, and well drilling pads, surfaced with impervious cover, and constructed as part of an overhead electric transmission line, wind-power, cell tower, oil or gas well drilling, sewer or water main, ski lift, or other linear utility project • Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are part of a residential, commercial or institutional development • Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are part of highway construction or reconstruction • Solar array field areas on slopes greater than 8% that cannot maintain sheet flow using management practices identified in the BB or the DM • Solar array field areas on slopes less than 8% that will alter the hydrology from pre- to post- development conditions • Solar array field areas with tables that are not elevated high enough to achieve final stabilization beneath the tables • Traditional impervious areas associated with solar development (e.g. roads, buildings, transformers) • Utility pads surfaced with impervious cover, including electric vehicle charging stations • All other construction activities that include the construction or reconstruction of impervious area or alter the hydrology from pre- to post-development conditions, and are not listed in Table 1 67 Page 773 of 849