Text · page 802 of 849
Read the whole document on one page (all 849 pages, each with its own heading)
SWPPP Preparer Certification Form SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP) (In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and submitted to NYSDEC electronically.) Project/Site Name: Multifamily Development eNOI Submission ID: HQN-V818-KWDXZ Brian Hillery & William Sahlem Owner/Operator Name: Certification Statement – SWPPP Preparer I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) has been prepared in accordance with the requirements of GP-0-25-001. I certify under penalty of law that the SWPPP and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Anthony J Pandolfe SWPPP Preparer First Name MI SWPPP Preparer Last Name 5/26/26 Signature Date Revised: January 2025 Page 802 of 849