Southtowns Record

PBA06.11.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jun 11, 2026, 6:00 p.m.
Posted by publisher
Jun 3, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 804 of 849

Read the whole document on one page (all 849 pages, each with its own heading)

eNOT MS4 Acceptance
  for construction activities seeking termination from the
  SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP)
  (The completed form must be attached to the eNOT, which must be submitted
  to NYSDEC electronically in accordance with CGP Part V.A.5.)
I.  Project Owner/Operator Information
  a. Owner/Operator Name:
  b. Contact Person:
  c. Street Address:
  d. City/State/Zip:
II.  Project Site Information
  a. Project/Site Name:
  b. Street Address:
  c. City/State/Zip:
  d. CGP SPDES Permit ID:
III.  Traditional Land Use Control MS4 Operator Information
  a. Name of MS4 Operator:
  b. MS4 SPDES Permit ID Number: NYR20A
  c. Street Address:
  d. City/State/Zip:
  e. Telephone Number:
IV.  Certification Statement
  I have determined that it is acceptable for the owner or operator of the construction project identified
  above to submit the electronic Notice of Termination in accordance with CGP Part V. I certify under
  penalty of law that this document and all attachments were prepared under my direction or supervision
  in accordance with a system designed to assure that qualified personnel properly gather and evaluate
  the information submitted. Based on my inquiry of the person or persons who manage the system, or
  those persons directly responsible for gathering the information, the information submitted is, to the
  best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
  penalties for submitting false information, including the possibility of fine and imprisonment for knowing
  violations.

  a. Printed name of the principal executive officer or ranking elected official for the MS4 Operator or
  their duly authorized representative in accordance with CGP Part VII.J.2.:

  b. Title/Position:
  c. Signature:
  d. Date:

  Page 804 of 849