PBA07.09.2026packet (full text)
Page 1
WEST SENECA
PLANNING BOARD
1300 Union Road, West Seneca, NY 14224
6:00 PM in the Community Center
July 9, 2026
AGENDA
Meeting # 2026-07
CALL TO ORDER
APPROVAL OF PROOFS OF PUBLICATION
APPROVAL OF MINUTES
1. Minutes of Meeting #2026-06
OLD BUSINESS
SPR 2026-002
A request of New Leaf Energy, Inc. for site plan approval for property located at 705
Orchard Park Road to permit an EV Parking Station and all associated site work.
SPR 2026-003
A request of Home Leasing, for site plan approval for a property located at 2544 Clinton
Street to permit a 3-story multi-unit residential building with all associated site work.
SPR 2026-005
A request of Zen Nails for property located at 1976 Ridge Road to permit an addition to the
existing building and all associated site work.
SPR 2026-006
A request of Carmina Wood Design, on behalf of the owner, for site plan approval for
property located at 1425 Orchard Park Rd to permit the development of a multi-unit town
house development with all associated site work.
NEW BUSINESS
2026-004
A request of Armstrong's Beer Company for property located at 1340 Orchard Park Road
for a special permit to allow the service of alcohol.
ADJOURN
Page 1 of 1493
Page 2
Page 2 of 1493
Page 3
17 Computer Drive West
Albany, NY 12205
518.438.9900
70 Linden Oaks, Third Floor
Rochester, NY 14625
Via Overnight Delivery 585.866.1100
March 26, 2026.
Town of West Seneca
1250 Union Road
West Seneca, NY 14224
Attention: Jeffery Schieber
RE: Application for Site Plan Review
Proposed EV Charging Stations
705 Orchard Park Road \ NYS Route 240
Town of West Seneca, Erie County
Tax Account 143.06-1-16
Dear Mr. Schieber,
On behalf of our client, New Leaf Energy, Inc., we are pleased to submit the application documents
enclosed for Planning Board review. Enclosed please find the following items in support of our
application:
A. (22) Copies of the Letter of Intent, prepared by Bohler, dated 3/26/26.
B. (22) Copies of the Site Plan Application
C. (22) Copies of the Short Environmental Assessment Form, prepared by Bohler, dated 3/26/26
D. (22) Copies of the Canopy Rendering, prepared by Weston & Sampson design Studio
E. (1) 11x17 Copy of the Boundary & Topographic Map, prepared be Colliers, dated 8/15/25
F. (1) 11x17 Copy of the Site Plan, prepared by Bohler, dated 3/26/26
G. (22) Full-size copies of the Boundary & Topographic Map, prepared by Colliers, dated 8/15/25
H. (22) Full-size copies of the Site Plan, prepared by Bohler, dated 3/26/26
I. Check in the amount of $600 for Planning Board Review Fee
J. Email with a pdf of all submitted documents.
Existing Conditions
The existing 0.143-acre parcel is located between the Mobil gas station and the Wendy’s restaurant rear
parking area. The site is undeveloped and consists of maintained lawn. There is an existing curb cut with
an asphalt driveway apron. The site sheet flows west to east toward Orchard Park Road.
Proposed Project
The applicant is proposing to construct (10) EV charging parking spaces with (5) EV Charging Stations
and a canopy. One EV charging station will service two parking spaces. An ADA compliant space is being
provided. The project will include associated site improvements consisting of modifying the existing curb
cut onto Orchard Park Road, stormwater mitigation, transformer and electrical power equipment.
Zoning
The project site is zoned C-1 commercial where EV charging stations are an allowed use. Given the size
of the existing parcel, we anticipate area variances will be required for pavement setbacks (10’ required,
3’ proposed) and building setbacks (40’ front, 5’ side and 30’ rear required, 6.6’ front, 0’ side and 22.0’
rear proposed). We will make application to the Zoning Board of Appeals to request area variances.
www.BohlerEngineering.com
Page 3 of 1493
Page 4
Proposed EV Charging Stations Site Plan Review
705 Orchard Park Road Page 2 of 2
West Seneca, NY 14224
Stormwater
The project will disturb ±0.14 acres of land and substantially decrease green space. To mitigate
stormwater runoff, an underground pipe detention system is proposed to reduce post construction
discharge rates to pre-existing discharge rate. The intent would be to utilize perforated pipe to allow for
infiltration. Infiltration testing will be completed to confirm the design.
Construction Schedule
The intent would be to start construction once all municipal approvals and permits are obtained. It is
estimated that the duration of construction will be ±4 weeks.
We look forward to presenting this information at the May 14th Town Planning Board meeting. If you have
any questions, please do not hesitate to contact our office.
Sincerely,
BOHLER ENGINEERING NY, PLLC
Randy Bebout
Cc:
James Rambone, New Leaf Energy
www.BohlerEngineering.com
Page 4 of 1493
Page 5
3/24/26
PROPOSED EV CHARGING STATIONS
705 ORCHARD PARK ROAD (BETWEEN MOBIL & WENDY'S)
NEW LEAF ENERGY, INC. 978-483-0037
55 TECHNOLOGY DRIVE, SUITE 102,LOWELL, MA 01851
GLR HOLDINGS, LLC 585-262-3630
180 Canal View Blvd. Suite 600, Rochester, New York 14623
BOHLER ENGINEERING NY, PLLC 585.866.1100
70 LINDEN OAKS, THIRD FLOOR, ROCHESTER, NY 14625
143.06-1-16
PROPOSED CONST. OF (10) EV CHARGING PARKING SPACES W\CANOPY,(5) CHARGING STATIONS, NEW
ACCESS DRIVE AND ASSOCIATED SITE IMPROVEMENTS (STORM DRAINAGE, ELECTRICAL EQUIPMENT, ETC.)
0.143 N/A
ORCHARD PARK ROAD, APPROX. 45' OF FRONTAGE
C-1,COMMERCIAL NO CHANGE
UNDEVELOPED
EV CHARGING STATIONS
COMMERCIAL
N/A N/A
AREA VARIANCES WILL BE REQURED FOR PAVEMENT AND STRUCTURE SETBACKS
Page 5 of 1493
Page 6
Page 6 of 1493
Page 7
Page 7 of 1493
Page 8
Page 8 of 1493
Page 9
Page 9 of 1493
Page 10
OP 1 | PULL-IN PARKING
Page 10 of 1493
Page 11
OP 1 | BACK-IN PARKING
Page 11 of 1493
Page 12
Project:
1) DESIGN CRITERIA FLAT ROOF SNOW LOAD, Pf = 30.0 PSF
SNOW EXPOSURE FACTOR, Ce = 1.00
A. STRUCTURAL DESIGN IS IN ACCORDANCE WITH THE THERMAL FACTOR, Ct = 1.20
COLUMN REACTIONS @ GRIDLINE 1
FOLLOWING CODES AND CRITERIA: IMPORTANCE FACTOR, IS = 1.00
180° MOMENT MOMENT MOMENT
HORIZONTAL HORIZONTAL VERTICAL
REACTION ABOUT REACTION ABOUT REACTION ABOUT
1. MASSACHUSETTS BUILDING CODE USED TO ADDRESS 2) STRUCTURAL STEEL LOAD CASE REACTION, X-DIR. REACTION, Z-DIR. REACTION, Y-DIR.
X-DIR Y-DIR Z-DIR
SNOW LOAD FOR EXAMPLE PURPOSES. EACH DESIGN 90° 270° (KIP) (KIP) (KIP) EV CANOPIES
WILL BE REFINED PER LOCATION. (KIP-FT) (KIP-FT) (KIP-FT)
1. ASTM SPECIFICATION AND GRADE. UNLESS NOTED Y
2. 10TH EDITION OF THE MASSACHUSETTS BUILDING
OTHERWISE ON THE DRAWINGS, STRUCTURAL STEEL
X SELF-WEIGHT ~ ~ 4.14 ~ ~ -34.6
CODE Z
SHALL BE AS FOLLOWS: DEAD LOAD ~ ~ 7.20 ~ ~ -85.8
2.1. BASED OFF 2021 INTERNATIONAL BUILDING CODE 0°
a) W-SHAPES: A992 Z
3. ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS
b) HSS, RECTANGULAR: A500, Gr. C - Fy = 50 ksi
X SNOW LOAD ~ ~ 14.4 ~ ~ -172
AND OTHER STRUCTURES
ROOF LIVE ~ ~ 9.60 ~ ~ -115
4. AISC360-16, AMERICAN INSTITUTE OF STEEL
3) FOUNDATION NOTES WIND 0° A -4.67 ~ -9.14 ~ ~ 164
CONSTRUCTION
1. FOUNDATION DESIGNED BASED ON THE FOLLOWING NOTES:
PROPERTIES: WIND 0° B -4.67 ~ 7.31 ~ ~ -89.6
B. BUILDING CLASSIFICATION
SOIL BEARING PRESSURE (NET) : 1,500 PSF · ALL REACTIONS ARE SERVICE LEVEL (UNFACTORED) WIND 90° A ~ 0.96 5.72 -11.5 -11.3 -68.1
SUBGRADE MODULUS: 100 PCI · NEGATIVE VERTICAL REACTION (Y-AXIS) INDICATES UPLIFT
1. BUILDING OCCUPANCY CLASSIFICATION: U
NOTE: PROOF ROLL THE EXPOSED SUBGRADE WITH A
· ALL WIND AND SEISMIC REACTIONS ARE REVERSIBLE WIND 90° B ~ 0.96 -5.30 -11.5 -11.3 63.1
· ALL WIND REACTIONS ARE PROVIDED AT VULT
MEDIUM-WEIGHT ROLLER TO DETERMINE IF ANY
· ALL SEISMIC REACTIONS TO BE MULTIPLIED BY APPROPRIATE ΩO
WIND 180° A 4.67 ~ -9.17 ~ ~ 53.6 Weston & Sampson Engineers, Inc.
C. DEAD LOADS = 15.0 PSF POCKETS OF SOFT, UNSUITABLE MATERIAL EXIST
FACTORS FOR ANCHORAGE AND FOUNDATION DESIGN WIND 180° B 4.67 ~ 7.31 ~ ~ -84.6 55 Walkers Brook Drive, Suite 100
BENEATH THE EXPOSED SUBGRADE. REMOVE ANY Reading, MA 01867
D. LIVE LOADS UNSUITABLE MATERIAL ENCOUNTERED AND REPLACE
FOUNDATION PLAN NOTES: 978.532.1900 800.SAMPSON
WITH A PROPERLY COMPACTED GRANULAR MATERIAL
ROOF = 20.0 PSF www.westonandsampson.com
1. FINAL GRADE ELEVATION: 100'-0"
REDUCIBLE PER 780 CMR, 10TH EDITION A. OWNER/CONTRACTOR SHALL RETAIN THE SERVICES OF
A GEOTECHNICAL ENGINEER TO VERIFY THAT THE 2. F# SIGNIFIES FOUNDATION SCHEDULE MARK
F# Consultants:
E. WIND LOADS DESIGN CRITERIA ABOVE NOTED FOUNDATION DESIGN PRESSURES AND
MODULUS ARE MET
DESIGN WIND SPEED, VULT = 127 MPH
B. OWNER/CONTRACTOR SHALL EMPLOY QUALIFIED
NOMINAL WIND SPEED, VASD = 97 MPH
INDEPENDENT SOIL-TESTING AGENCY TO VERIFY THAT Complete Structural Consulting
RISK CATEGORY = II ALL EXCAVATION AND BACKFILL OPERATIONS MEET THE 9880 Westpoint Drive, Suite 100
EXPOSURE CATEGORY = C CRITERIA OF THESE NOTES AND THE SPECIFICATIONS
Indianapolis, IN 46256
INTERNAL PRESSURE, GCpl = +/- 0.00
317.468.2004
VELOCITY PRESSURE, Kd = 0.85 C. ENGINEERED FILL SHALL BE CLEAN, WELL GRADED, AND
FREE DRAINING IN ITS COMPACTED STATE
F. SEISMIC DESIGN CRITERIA
D. GRANULAR FILL MATERIAL SHALL BE A "PIT RUN GRAVEL"
DESIGN CATEGORY = B AS IT OCCURS IN A NATURAL STATE WITH NO LUMPS OF
IMPORTANCE FACTOR, Ie = 1.00 CLAY OR ROCKS LARGER THAN 2" IN DIAMETER. IT MUST
CONFORM TO THE FOLLOWING GRADATIONS: 10 TO 40
MAPPED SPECTRAL RESPONSE ACCELERATION:
PERCENT SAND, 40 TO 80 PERCENT GRAVEL, AND 0 TO 15
SS = 0.198 g
PERCENT CLAY. OBTAIN FROM A BORROW PIT
S1 = 0.055 g APPROVED BY THE OWNER AND THE TESTING AGENCY
SITE CLASS = D
SPECTRAL RESPONSE COEFFICIENTS: E. COMPACT ALL GRANULAR FILL BENEATH SLABS ON
SDS = 0.211 g GRADE AND OVER FOOTINGS TO 95 PERCENT MODIFIED
SD1 = 0.088 g MAXIMUM DRY DENSITY, ASTM D-1557. INCREASE THE
SEISMIC FORCE RESISTING SYSTEM: COMPACTION REQUIREMENTS FOR ENGINEERED FILL
STEEL SYSTEM NOT SPECIFICALLY DETAILED FOR SUPPORTING FOOTINGS TO 97 PERCENT MODIFIED N
SEISMIC RESISTANCE MAXIMUM DRY DENSITY, ASTM D-1557. COMPACT ALL
BACKFILL NOT SUPPORTING SLABS, PAVEMENT, OR
R = 3.00
FOOTINGS TO 90 PERCENT MODIFIED MAXIMUM DRY
CS = 0.071 DENSITY, ASTM D-1557. PLACEMENT AND COMPACTION
OF FILL SHALL BE OVERSEEN BY THE TESTING AGENCY.
W E
ANALYSIS PROCEDURE USED: PLACE ALL GRANULAR FILL MATERIAL IN LAYERS NOT
EQUIVALENT LATERAL FORCE EXCEEDING 6" IN LOOSE THICKNESS. MECHANICALLY
COMPACT EACH LAYER TO AT LEAST THE REQUIRED
G. SNOW LOADS MINIMUM DRY DENSITY S
GROUND SNOW LOAD, Pg = 30.0 PSF F. ALL BACKFILL PLACED AGAINST CONCRETE WALLS
SHALL BE A WELL-GRADED, FREE-DRAINING, GRANULAR 20 0 10 20
Note: MATERIAL APPROVED BY THE TESTING AGENCY
Loads from Carver, Massachusetts were chosen for demonstration 4) CONCRETE 1" = 20'
purposes. Each design will be updated and refined based on the site (IN FEET)
and final loading criteria
1. ALL CONCRETE SHALL BE MINIMUM 4,000 PSI WITH A
MINIMUM AIR ENTRAINMENT OF 6%.
2. ALL STEEL REINFORCEMENT BARS SHALL BE ASTM
A615 GRADE 60.
3. ALL STEEL REINFORCEMENT SPLICES SHALL BE
LAPPED A MINIMUM OF 42", UNLESS NOTED
OTHERWISE.
No. Description Date
Revisions
Seal:
DRAFT
Issued For:
REVIEW
(NOT FOR CONSTRUCTION)
Issued Date: 12/12/2024
Drawn By: RRK
Reviewed By: ASK
Approved By: ASK
W&S Project No.:
Drawing Title:
GENERAL NOTES
Sheet Number:
S100
Page 12 of 1493
Page 13
Project:
1 12
1
1/2
Dt EV CANOPIES
HSS PURLINS
SPACED @ 5'-0" C/C
3 W16x67
HSS7x4x16 PURLINS SPACED BEAMS
@ 5'-0" C/C TYP. MAY BE
FLUSH BOLTED OR TOP MOUNTED
Weston & Sampson Engineers, Inc.
55 Walkers Brook Drive, Suite 100
BUILT-UP WIDE FLANGE COLUMNS, Reading, MA 01867
978.532.1900 800.SAMPSON
FLANGE THK: 13
16"
24'-0"
www.westonandsampson.com
WEB THK: 21"
12'-8"
Dt:1'-6"
10'-11"
Consultants:
Db:2'-0"
FOUNDATION PER SCHEDULE
FINAL TO BE AT FROST DEPTH Complete Structural Consulting
9880 Westpoint Drive, Suite 100
Indianapolis, IN 46256
317.468.2004
Db
WIDE FLANGE BEAM
N
24'-0"
W E
24'-3"
S
SECTION CUT
2 SCALE: 1/2" = 1'-0"
20 0 10 20
96'-0"
1" = 20'
(IN FEET)
F1 TYP. 3'-0"
3"
24'-0"
(4)ø1 1/2" ANCHOR RODS,
20" EMBEDMENT
13'-0"
3"
2'-6"
2 3/4" BASE PLATE
No. Description Date
Revisions
Seal:
TYP.
1/2
DRAFT
24'-0"
Issued For:
6'-6" 6'-6"
REVIEW
(NOT FOR CONSTRUCTION)
P:\24.0812 EV Canopies (WSE)\04 DWGs & MODELS\_CSC DRAWINGS\EV Canopy_Shareable.dwg
Issued Date: 12/12/2024
13'-0" Drawn By: RRK
Reviewed By: ASK
Approved By: ASK
FOUNDATION PLAN VIEW W&S Project No.:
3 SCALE: N.T.S
Drawing Title:
5'-0" 5'-0" 5'-0" 5'-0"
PULL IN PARKING
STRUCTURAL SCHEDULE
STEEL WEIGHT REINFORCING REINFORCING TOP / FTG.
MARK SIZE (L x W x T) NOTES
PLAN VIEW (LBS) (TOP) (BOTTOM) ELEVATION
1 SCALE: 3/16" = 1'-0" 4,800 PER BAY FURTHER BORING REQUIRED AND
Sheet Number:
F1 (INCLUDES 13'-0" x 13'-0" X 2'-0" (10) #5 EA. WAY (22) #5 EA. WAY 100'-0" SOIL CONDITIONS TO BE CONFIRMED
PURLINS) PER LOCATION
S200
Page 13 of 1493
Page 14
&
Engineering
Design,
Architecture,
Surveying, CT Landscape
P.C. Architecture,
N
W E
Engineering
& Design
NORTH
www.colliersengineering.com
Copyright © 2025. Colliers Engineering & Design All Rights Reserved. This drawing and all the
information contained herein is authorized for use only by the party for whom the services
were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed,
S distributed or relied upon for any other purpose without the express written consent of
Colliers Engineering & Design.
Formerly Known as
C O+ SURVEYING
ENGINEERS N S U L T I N G
REV DATE DESCRIPTION
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
NEW LEAF ENERGY
LEGEND
705 ORCHARD PARK ROAD
TOWN OF WEST SENECA
ERIE COUNTY, N.Y.
ABBREVIATIONS
By: MICHAEL.ENNIS on 2025-08-21 -- 03:17pm
BUFFALO (BA)
40 LaRiviere Drive,
Suite 200
Buffalo, NY 14202
Phone: 716.852.3211
Engineering COLLIERS ENGINEERING & DESIGN, &
Engineering
Design,
Architecture,
Surveying, CT Landscape
P.C. Architecture,
& Design ARCHITECTURE, LANDSCAPE ARCHITECTURE,
SURVEYING CT, P.C.
SCALE: DRAWN BY:
AS SHOWN MJE
R:\Projects\2025\25903000\25903004\Survey\25903004 V-SURV.dwg\V-SURVEY
DESIGNED BY: REVIEWED BY:
MJE
DATE ISSUED: PROJECT NUMBER:
08/15/25 25903004
FIELD BOOK: PAGE:
SHEET NAME:
BOUNDARY &
10 0 10 20
TOPOGRAPHIC MAP
SCALE : 1" = 10' DRAWING NUMBER:
Linear unit of measure: US Survey Foot (1 ft = 1200/3937 m)
1 of 1
UNAUTHORIZED ALTERATION OR ADDITION TO AN ARCHITECTURAL DOCUMENT BEARING A LICENSED PROFESSIONAL ARCHITECT'S SEAL IS A VIOLATION OF SECTION 8 NYCRR 69.5(b), OF THE NEW YORK STATE EDUCATION LAW. ONLY DOCUMENTS WITH THE PROFESSIONAL ARCHITECT'S SEAL ARE GENUINE TRUE AND CORRECT COPIES OF THE PROFESSIONAL ARCHITECT’S ORIGINAL WORK AND OPINION.
UNAUTHORIZED ALTERATION OR ADDITION TO A SURVEY OR ENGINEERING DOCUMENT BEARING A LICENSED LAND SURVEYOR OR PROFESSIONAL ENGINEER'S SEAL IS A VIOLATION OF SECTION 7209, SUB-DIVISION 2, OF THE NEW YORK STATE EDUCATION LAW. ONLY DOCUMENTS WITH THE LAND SURVEYOR OR PROFESSIONAL ENGINEER'S SEAL ARE GENUINE TRUE AND CORRECT COPIES OF THE LAND SURVEYOR OR PROFESSIONAL ENGINEER’S ORIGINAL WORK AND OPINION.
NOTE: DO NOT SCALE DRAWINGS FOR CONSTRUCTION.
Page 14 of 1493
Page 15
SITE INFORMATION
APPLICANT:
NEW LEAF ENERGY, INC.
55 TECHNOLOGY DRIVE, SUITE #102 ,
LOWELL, MA 01851
OWNER:
W GLR HOLDINGS, LLC
180 CANAL VIEW BLVD, SUITE 600
NAD83
NAD83
E ROCHESTER, NY 14623
SITE NOTES (REV. 5/2024)
S 1. ALL CONCRETE MUST BE AIR ENTRAINED AND INCLUDE THE MINIMUM COMPRESSIVE STRENGTH OF JURISDICTIONAL
STANDARD PSI AT 28 DAYS (OR 4,000 PSI) UNLESS OTHERWISE NOTED ON THE PLANS, DETAILS AND/OR
GEOTECHNICAL REPORT. IF THERE ARE ANY DISCREPANCIES BETWEEN THE PLANS, DETAILS AND GEOTECHNICAL
REPORT THEN THE GEOTECHNICAL REPORT SHALL GOVERN.
2. THE CONTRACTOR MUST REPAIR OR REPLACE, AT THE CONTRACTOR'S SOLE COST AND EXPENSE, ALL SIDEWALKS,
CURBS, PAVEMENT MARKINGS, AND PAVEMENT DAMAGED BY CONSTRUCTION ACTIVITIES WHETHER SPECIFIED ON
THIS PLAN OR NOT.
3. CONTRACTOR IS CAUTIONED OF EXISTING UTILITY SERVICES TO REMAIN IN PROXIMITY TO PROPOSED BOLLARDS AND
SIGNS. CONTRACTOR SHALL PROVIDE FIELD MODIFICATION LOCATIONS OF BOLLARDS AND BOLLARDS WITH SIGNAGE
AS NEEDED TO AVOID CONFLICTS WITH EXISTING UTILITY SERVICES TO REMAIN.
.com
UTILITY NOTES
ROCHESTER, NY 14625
www.BohlerEngineering
(REV. 7/2024)
(585) 866-1100
70 LINDEN OAKS
1. ALL WORK ASSOCIATED WITH UTILITY POLES, OVERHEAD WIRES AND ANY/ALL APPURTENANCES SHALL BE
THIRD FLOOR
COORDINATED BY THE GC WITH THE LOCAL UTILITY COMPANIES PRIOR TO THE ORDERING OF ANY MATERIALS. THIS
MAY INCLUDE BUT IS NOT LIMITED TO THE REMOVAL, INSTALLATION, RELOCATION OR PROTECTION OF ANY BRACING,
GUY WIRES, OVERHEAD WIRES, ETC. AS MAY BE REQUIRED TO ACCOMMODATE THE PROJECT.
2. TRANSFORMERS AND SWITCH GEARS: GC SHALL PROVIDE ALL APPURTENANCES IN ACCORDANCE WITH UTILITY
COMPANY SPECIFICATIONS AND CARRY SAME IN BASE BID. APPURTENANCES SHALL INCLUDE, BUT NOT BE LIMITED
TO, THE CONCRETE PAD, SECONDARY SPILL CONTAINMENT AREAS (IF REQUIRED), BOLLARD / VEHICULAR
Phone:
PROTECTION, AND OTHER ITEMS AS MAY BE REQUIRED BY THE UTILITY PROVIDER FOR INSTALLATION OF THE
TRANSFORMER AND SWITCH GEAR (IF REQUIRED). GC SHALL COORDINATE ALL ASPECTS OF INSTALLATION WITH
UTILITY PROVIDER PRIOR TO ORDERING OF MATERIALS AND NOTIFY DESIGN ENGINEER OF ANY CONFLICTS IN
WRITING.
ORCHARD PARK ROAD
138.00'
N 80°00'37" N
3.5'
4'
4'
22.2' GREEN AREA
PROP EOP
GREEN AREA
PROP EOP
S 09°36'27" E
20'
45.00'
PROP PANEL BOARD,
PROP ASPHALT PAVEMENT (TYP)
45.00'
PROP UTILITY POLE METER, & SWITCHBOARD PROP CANTILEVERED EV
ON 7'X17.25' CONCRETE PAD CHARGING CANOPY
PROPOSED EV CHARGING STATIONS
PROP 4" PAVEMENT STRIPE
PROP 6" PROP STRIPED
PAINTED WHITE (TYP)
BOLLARD (TYP) LOADING AREA
11' 3'R
PROP GRAVEL AREA
WEST SENECA, NY 14224
705 ORCHARD PARK RD
8' 6.6'
8' 10' 10'
18'
18'
PROP 6" GREEN AREA
BOLLARD (TYP)
8'
3'
3'
3.7' 138.00'
PROP TRANSFORMER S 80°00'37" W 12.00'
ON CONCRETE PAD PROP CANOPY COLUMN (TYP) PROP DUAL PORT EV CHARGER
PROP EV CHARGING SIGN PROP EV CHARGING SIGN (TYP)
ON CONRETE PAD (TYP OF 5)
& LAST USE SIGN (TYP)
THIS PLAN TO BE UTILIZED
ALWAYS CALL 811 FOR SITE LAYOUT PURPOSES
It's fast. It's free. It's the law. ONLY
GENERAL NOTE:
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT
WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO
THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN
10 5 2.5 0
1"= 10'
10
C-2.1
WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE
ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN SITE PLAN
FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES.
Page 15 of 1493
Page 16
Page 16 of 1493
Page 17
Page 17 of 1493
Page 18
Page 18 of 1493
Page 19
17 Computer Drive West
Albany, NY 12205
518.438.9900
70 Linden Oaks, Third Floor
Rochester, NY 14625
Via Overnight Delivery 585.866.1100
March 26, 2026.
Town of West Seneca
1250 Union Road
West Seneca, NY 14224
Attention: Jeffery Schieber
RE: Application for Site Plan Review
Proposed EV Charging Stations
705 Orchard Park Road \ NYS Route 240
Town of West Seneca, Erie County
Tax Account 143.06-1-16
Dear Mr. Schieber,
On behalf of our client, New Leaf Energy, Inc., we are pleased to submit the application documents
enclosed for Planning Board review. Enclosed please find the following items in support of our
application:
A. (22) Copies of the Letter of Intent, prepared by Bohler, dated 3/26/26.
B. (22) Copies of the Site Plan Application
C. (22) Copies of the Short Environmental Assessment Form, prepared by Bohler, dated 3/26/26
D. (22) Copies of the Canopy Rendering, prepared by Weston & Sampson design Studio
E. (1) 11x17 Copy of the Boundary & Topographic Map, prepared be Colliers, dated 8/15/25
F. (1) 11x17 Copy of the Site Plan, prepared by Bohler, dated 3/26/26
G. (22) Full-size copies of the Boundary & Topographic Map, prepared by Colliers, dated 8/15/25
H. (22) Full-size copies of the Site Plan, prepared by Bohler, dated 3/26/26
I. Check in the amount of $600 for Planning Board Review Fee
J. Email with a pdf of all submitted documents.
Existing Conditions
The existing 0.143-acre parcel is located between the Mobil gas station and the Wendy’s restaurant rear
parking area. The site is undeveloped and consists of maintained lawn. There is an existing curb cut with
an asphalt driveway apron. The site sheet flows west to east toward Orchard Park Road.
Proposed Project
The applicant is proposing to construct (10) EV charging parking spaces with (5) EV Charging Stations
and a canopy. One EV charging station will service two parking spaces. An ADA compliant space is being
provided. The project will include associated site improvements consisting of modifying the existing curb
cut onto Orchard Park Road, stormwater mitigation, transformer and electrical power equipment.
Zoning
The project site is zoned C-1 commercial where EV charging stations are an allowed use. Given the size
of the existing parcel, we anticipate area variances will be required for pavement setbacks (10’ required,
3’ proposed) and building setbacks (40’ front, 5’ side and 30’ rear required, 6.6’ front, 0’ side and 22.0’
rear proposed). We will make application to the Zoning Board of Appeals to request area variances.
www.BohlerEngineering.com
Page 19 of 1493
Page 20
Proposed EV Charging Stations Site Plan Review
705 Orchard Park Road Page 2 of 2
West Seneca, NY 14224
Stormwater
The project will disturb ±0.14 acres of land and substantially decrease green space. To mitigate
stormwater runoff, an underground pipe detention system is proposed to reduce post construction
discharge rates to pre-existing discharge rate. The intent would be to utilize perforated pipe to allow for
infiltration. Infiltration testing will be completed to confirm the design.
Construction Schedule
The intent would be to start construction once all municipal approvals and permits are obtained. It is
estimated that the duration of construction will be ±4 weeks.
We look forward to presenting this information at the May 14th Town Planning Board meeting. If you have
any questions, please do not hesitate to contact our office.
Sincerely,
BOHLER ENGINEERING NY, PLLC
Randy Bebout
Cc:
James Rambone, New Leaf Energy
www.BohlerEngineering.com
Page 20 of 1493
Page 21
3/24/26
PROPOSED EV CHARGING STATIONS
705 ORCHARD PARK ROAD (BETWEEN MOBIL & WENDY'S)
NEW LEAF ENERGY, INC. 978-483-0037
55 TECHNOLOGY DRIVE, SUITE 102,LOWELL, MA 01851
GLR HOLDINGS, LLC 585-262-3630
180 Canal View Blvd. Suite 600, Rochester, New York 14623
BOHLER ENGINEERING NY, PLLC 585.866.1100
70 LINDEN OAKS, THIRD FLOOR, ROCHESTER, NY 14625
143.06-1-16
PROPOSED CONST. OF (10) EV CHARGING PARKING SPACES W\CANOPY,(5) CHARGING STATIONS, NEW
ACCESS DRIVE AND ASSOCIATED SITE IMPROVEMENTS (STORM DRAINAGE, ELECTRICAL EQUIPMENT, ETC.)
0.143 N/A
ORCHARD PARK ROAD, APPROX. 45' OF FRONTAGE
C-1,COMMERCIAL NO CHANGE
UNDEVELOPED
EV CHARGING STATIONS
COMMERCIAL
N/A N/A
AREA VARIANCES WILL BE REQURED FOR PAVEMENT AND STRUCTURE SETBACKS
Page 21 of 1493
Page 22
Page 22 of 1493
Page 23
Page 23 of 1493
Page 24
Page 24 of 1493
Page 25
Page 25 of 1493
Page 26
OP 1 | PULL-IN PARKING
Page 26 of 1493
Page 27
OP 1 | BACK-IN PARKING
Page 27 of 1493
Page 28
Project:
1) DESIGN CRITERIA FLAT ROOF SNOW LOAD, Pf = 30.0 PSF
SNOW EXPOSURE FACTOR, Ce = 1.00
A. STRUCTURAL DESIGN IS IN ACCORDANCE WITH THE THERMAL FACTOR, Ct = 1.20
COLUMN REACTIONS @ GRIDLINE 1
FOLLOWING CODES AND CRITERIA: IMPORTANCE FACTOR, IS = 1.00
180° MOMENT MOMENT MOMENT
HORIZONTAL HORIZONTAL VERTICAL
REACTION ABOUT REACTION ABOUT REACTION ABOUT
1. MASSACHUSETTS BUILDING CODE USED TO ADDRESS 2) STRUCTURAL STEEL LOAD CASE REACTION, X-DIR. REACTION, Z-DIR. REACTION, Y-DIR.
X-DIR Y-DIR Z-DIR
SNOW LOAD FOR EXAMPLE PURPOSES. EACH DESIGN 90° 270° (KIP) (KIP) (KIP) EV CANOPIES
WILL BE REFINED PER LOCATION. (KIP-FT) (KIP-FT) (KIP-FT)
1. ASTM SPECIFICATION AND GRADE. UNLESS NOTED Y
2. 10TH EDITION OF THE MASSACHUSETTS BUILDING
OTHERWISE ON THE DRAWINGS, STRUCTURAL STEEL
X SELF-WEIGHT ~ ~ 4.14 ~ ~ -34.6
CODE Z
SHALL BE AS FOLLOWS: DEAD LOAD ~ ~ 7.20 ~ ~ -85.8
2.1. BASED OFF 2021 INTERNATIONAL BUILDING CODE 0°
a) W-SHAPES: A992 Z
3. ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS
b) HSS, RECTANGULAR: A500, Gr. C - Fy = 50 ksi
X SNOW LOAD ~ ~ 14.4 ~ ~ -172
AND OTHER STRUCTURES
ROOF LIVE ~ ~ 9.60 ~ ~ -115
4. AISC360-16, AMERICAN INSTITUTE OF STEEL
3) FOUNDATION NOTES WIND 0° A -4.67 ~ -9.14 ~ ~ 164
CONSTRUCTION
1. FOUNDATION DESIGNED BASED ON THE FOLLOWING NOTES:
PROPERTIES: WIND 0° B -4.67 ~ 7.31 ~ ~ -89.6
B. BUILDING CLASSIFICATION
SOIL BEARING PRESSURE (NET) : 1,500 PSF · ALL REACTIONS ARE SERVICE LEVEL (UNFACTORED) WIND 90° A ~ 0.96 5.72 -11.5 -11.3 -68.1
SUBGRADE MODULUS: 100 PCI · NEGATIVE VERTICAL REACTION (Y-AXIS) INDICATES UPLIFT
1. BUILDING OCCUPANCY CLASSIFICATION: U
NOTE: PROOF ROLL THE EXPOSED SUBGRADE WITH A
· ALL WIND AND SEISMIC REACTIONS ARE REVERSIBLE WIND 90° B ~ 0.96 -5.30 -11.5 -11.3 63.1
· ALL WIND REACTIONS ARE PROVIDED AT VULT
MEDIUM-WEIGHT ROLLER TO DETERMINE IF ANY
· ALL SEISMIC REACTIONS TO BE MULTIPLIED BY APPROPRIATE ΩO
WIND 180° A 4.67 ~ -9.17 ~ ~ 53.6 Weston & Sampson Engineers, Inc.
C. DEAD LOADS = 15.0 PSF POCKETS OF SOFT, UNSUITABLE MATERIAL EXIST
FACTORS FOR ANCHORAGE AND FOUNDATION DESIGN WIND 180° B 4.67 ~ 7.31 ~ ~ -84.6 55 Walkers Brook Drive, Suite 100
BENEATH THE EXPOSED SUBGRADE. REMOVE ANY Reading, MA 01867
D. LIVE LOADS UNSUITABLE MATERIAL ENCOUNTERED AND REPLACE
FOUNDATION PLAN NOTES: 978.532.1900 800.SAMPSON
WITH A PROPERLY COMPACTED GRANULAR MATERIAL
ROOF = 20.0 PSF www.westonandsampson.com
1. FINAL GRADE ELEVATION: 100'-0"
REDUCIBLE PER 780 CMR, 10TH EDITION A. OWNER/CONTRACTOR SHALL RETAIN THE SERVICES OF
A GEOTECHNICAL ENGINEER TO VERIFY THAT THE 2. F# SIGNIFIES FOUNDATION SCHEDULE MARK
F# Consultants:
E. WIND LOADS DESIGN CRITERIA ABOVE NOTED FOUNDATION DESIGN PRESSURES AND
MODULUS ARE MET
DESIGN WIND SPEED, VULT = 127 MPH
B. OWNER/CONTRACTOR SHALL EMPLOY QUALIFIED
NOMINAL WIND SPEED, VASD = 97 MPH
INDEPENDENT SOIL-TESTING AGENCY TO VERIFY THAT Complete Structural Consulting
RISK CATEGORY = II ALL EXCAVATION AND BACKFILL OPERATIONS MEET THE 9880 Westpoint Drive, Suite 100
EXPOSURE CATEGORY = C CRITERIA OF THESE NOTES AND THE SPECIFICATIONS
Indianapolis, IN 46256
INTERNAL PRESSURE, GCpl = +/- 0.00
317.468.2004
VELOCITY PRESSURE, Kd = 0.85 C. ENGINEERED FILL SHALL BE CLEAN, WELL GRADED, AND
FREE DRAINING IN ITS COMPACTED STATE
F. SEISMIC DESIGN CRITERIA
D. GRANULAR FILL MATERIAL SHALL BE A "PIT RUN GRAVEL"
DESIGN CATEGORY = B AS IT OCCURS IN A NATURAL STATE WITH NO LUMPS OF
IMPORTANCE FACTOR, Ie = 1.00 CLAY OR ROCKS LARGER THAN 2" IN DIAMETER. IT MUST
CONFORM TO THE FOLLOWING GRADATIONS: 10 TO 40
MAPPED SPECTRAL RESPONSE ACCELERATION:
PERCENT SAND, 40 TO 80 PERCENT GRAVEL, AND 0 TO 15
SS = 0.198 g
PERCENT CLAY. OBTAIN FROM A BORROW PIT
S1 = 0.055 g APPROVED BY THE OWNER AND THE TESTING AGENCY
SITE CLASS = D
SPECTRAL RESPONSE COEFFICIENTS: E. COMPACT ALL GRANULAR FILL BENEATH SLABS ON
SDS = 0.211 g GRADE AND OVER FOOTINGS TO 95 PERCENT MODIFIED
SD1 = 0.088 g MAXIMUM DRY DENSITY, ASTM D-1557. INCREASE THE
SEISMIC FORCE RESISTING SYSTEM: COMPACTION REQUIREMENTS FOR ENGINEERED FILL
STEEL SYSTEM NOT SPECIFICALLY DETAILED FOR SUPPORTING FOOTINGS TO 97 PERCENT MODIFIED N
SEISMIC RESISTANCE MAXIMUM DRY DENSITY, ASTM D-1557. COMPACT ALL
BACKFILL NOT SUPPORTING SLABS, PAVEMENT, OR
R = 3.00
FOOTINGS TO 90 PERCENT MODIFIED MAXIMUM DRY
CS = 0.071 DENSITY, ASTM D-1557. PLACEMENT AND COMPACTION
OF FILL SHALL BE OVERSEEN BY THE TESTING AGENCY.
W E
ANALYSIS PROCEDURE USED: PLACE ALL GRANULAR FILL MATERIAL IN LAYERS NOT
EQUIVALENT LATERAL FORCE EXCEEDING 6" IN LOOSE THICKNESS. MECHANICALLY
COMPACT EACH LAYER TO AT LEAST THE REQUIRED
G. SNOW LOADS MINIMUM DRY DENSITY S
GROUND SNOW LOAD, Pg = 30.0 PSF F. ALL BACKFILL PLACED AGAINST CONCRETE WALLS
SHALL BE A WELL-GRADED, FREE-DRAINING, GRANULAR 20 0 10 20
Note: MATERIAL APPROVED BY THE TESTING AGENCY
Loads from Carver, Massachusetts were chosen for demonstration 4) CONCRETE 1" = 20'
purposes. Each design will be updated and refined based on the site (IN FEET)
and final loading criteria
1. ALL CONCRETE SHALL BE MINIMUM 4,000 PSI WITH A
MINIMUM AIR ENTRAINMENT OF 6%.
2. ALL STEEL REINFORCEMENT BARS SHALL BE ASTM
A615 GRADE 60.
3. ALL STEEL REINFORCEMENT SPLICES SHALL BE
LAPPED A MINIMUM OF 42", UNLESS NOTED
OTHERWISE.
No. Description Date
Revisions
Seal:
DRAFT
Issued For:
REVIEW
(NOT FOR CONSTRUCTION)
Issued Date: 12/12/2024
Drawn By: RRK
Reviewed By: ASK
Approved By: ASK
W&S Project No.:
Drawing Title:
GENERAL NOTES
Sheet Number:
S100
Page 28 of 1493
Page 29
Project:
1 12
1
1/2
Dt EV CANOPIES
HSS PURLINS
SPACED @ 5'-0" C/C
3 W16x67
HSS7x4x16 PURLINS SPACED BEAMS
@ 5'-0" C/C TYP. MAY BE
FLUSH BOLTED OR TOP MOUNTED
Weston & Sampson Engineers, Inc.
55 Walkers Brook Drive, Suite 100
BUILT-UP WIDE FLANGE COLUMNS, Reading, MA 01867
978.532.1900 800.SAMPSON
FLANGE THK: 13
16"
24'-0"
www.westonandsampson.com
WEB THK: 21"
12'-8"
Dt:1'-6"
10'-11"
Consultants:
Db:2'-0"
FOUNDATION PER SCHEDULE
FINAL TO BE AT FROST DEPTH Complete Structural Consulting
9880 Westpoint Drive, Suite 100
Indianapolis, IN 46256
317.468.2004
Db
WIDE FLANGE BEAM
N
24'-0"
W E
24'-3"
S
SECTION CUT
2 SCALE: 1/2" = 1'-0"
20 0 10 20
96'-0"
1" = 20'
(IN FEET)
F1 TYP. 3'-0"
3"
24'-0"
(4)ø1 1/2" ANCHOR RODS,
20" EMBEDMENT
13'-0"
3"
2'-6"
2 3/4" BASE PLATE
No. Description Date
Revisions
Seal:
TYP.
1/2
DRAFT
24'-0"
Issued For:
6'-6" 6'-6"
REVIEW
(NOT FOR CONSTRUCTION)
P:\24.0812 EV Canopies (WSE)\04 DWGs & MODELS\_CSC DRAWINGS\EV Canopy_Shareable.dwg
Issued Date: 12/12/2024
13'-0" Drawn By: RRK
Reviewed By: ASK
Approved By: ASK
FOUNDATION PLAN VIEW W&S Project No.:
3 SCALE: N.T.S
Drawing Title:
5'-0" 5'-0" 5'-0" 5'-0"
PULL IN PARKING
STRUCTURAL SCHEDULE
STEEL WEIGHT REINFORCING REINFORCING TOP / FTG.
MARK SIZE (L x W x T) NOTES
PLAN VIEW (LBS) (TOP) (BOTTOM) ELEVATION
1 SCALE: 3/16" = 1'-0" 4,800 PER BAY FURTHER BORING REQUIRED AND
Sheet Number:
F1 (INCLUDES 13'-0" x 13'-0" X 2'-0" (10) #5 EA. WAY (22) #5 EA. WAY 100'-0" SOIL CONDITIONS TO BE CONFIRMED
PURLINS) PER LOCATION
S200
Page 29 of 1493
Page 30
&
Engineering
Design,
Architecture,
Surveying, CT Landscape
P.C. Architecture,
N
W E
Engineering
& Design
NORTH
www.colliersengineering.com
Copyright © 2025. Colliers Engineering & Design All Rights Reserved. This drawing and all the
information contained herein is authorized for use only by the party for whom the services
were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed,
S distributed or relied upon for any other purpose without the express written consent of
Colliers Engineering & Design.
Formerly Known as
C O+ SURVEYING
ENGINEERS N S U L T I N G
REV DATE DESCRIPTION
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
. . .
NEW LEAF ENERGY
LEGEND
705 ORCHARD PARK ROAD
TOWN OF WEST SENECA
ERIE COUNTY, N.Y.
ABBREVIATIONS
By: MICHAEL.ENNIS on 2025-08-21 -- 03:17pm
BUFFALO (BA)
40 LaRiviere Drive,
Suite 200
Buffalo, NY 14202
Phone: 716.852.3211
Engineering COLLIERS ENGINEERING & DESIGN, &
Engineering
Design,
Architecture,
Surveying, CT Landscape
P.C. Architecture,
& Design ARCHITECTURE, LANDSCAPE ARCHITECTURE,
SURVEYING CT, P.C.
SCALE: DRAWN BY:
AS SHOWN MJE
R:\Projects\2025\25903000\25903004\Survey\25903004 V-SURV.dwg\V-SURVEY
DESIGNED BY: REVIEWED BY:
MJE
DATE ISSUED: PROJECT NUMBER:
08/15/25 25903004
FIELD BOOK: PAGE:
SHEET NAME:
BOUNDARY &
10 0 10 20
TOPOGRAPHIC MAP
SCALE : 1" = 10' DRAWING NUMBER:
Linear unit of measure: US Survey Foot (1 ft = 1200/3937 m)
1 of 1
UNAUTHORIZED ALTERATION OR ADDITION TO AN ARCHITECTURAL DOCUMENT BEARING A LICENSED PROFESSIONAL ARCHITECT'S SEAL IS A VIOLATION OF SECTION 8 NYCRR 69.5(b), OF THE NEW YORK STATE EDUCATION LAW. ONLY DOCUMENTS WITH THE PROFESSIONAL ARCHITECT'S SEAL ARE GENUINE TRUE AND CORRECT COPIES OF THE PROFESSIONAL ARCHITECT’S ORIGINAL WORK AND OPINION.
UNAUTHORIZED ALTERATION OR ADDITION TO A SURVEY OR ENGINEERING DOCUMENT BEARING A LICENSED LAND SURVEYOR OR PROFESSIONAL ENGINEER'S SEAL IS A VIOLATION OF SECTION 7209, SUB-DIVISION 2, OF THE NEW YORK STATE EDUCATION LAW. ONLY DOCUMENTS WITH THE LAND SURVEYOR OR PROFESSIONAL ENGINEER'S SEAL ARE GENUINE TRUE AND CORRECT COPIES OF THE LAND SURVEYOR OR PROFESSIONAL ENGINEER’S ORIGINAL WORK AND OPINION.
NOTE: DO NOT SCALE DRAWINGS FOR CONSTRUCTION.
Page 30 of 1493
Page 31
SITE INFORMATION
APPLICANT:
NEW LEAF ENERGY, INC.
55 TECHNOLOGY DRIVE, SUITE #102 ,
LOWELL, MA 01851
OWNER:
W GLR HOLDINGS, LLC
180 CANAL VIEW BLVD, SUITE 600
NAD83
NAD83
E ROCHESTER, NY 14623
SITE NOTES (REV. 5/2024)
S 1. ALL CONCRETE MUST BE AIR ENTRAINED AND INCLUDE THE MINIMUM COMPRESSIVE STRENGTH OF JURISDICTIONAL
STANDARD PSI AT 28 DAYS (OR 4,000 PSI) UNLESS OTHERWISE NOTED ON THE PLANS, DETAILS AND/OR
GEOTECHNICAL REPORT. IF THERE ARE ANY DISCREPANCIES BETWEEN THE PLANS, DETAILS AND GEOTECHNICAL
REPORT THEN THE GEOTECHNICAL REPORT SHALL GOVERN.
2. THE CONTRACTOR MUST REPAIR OR REPLACE, AT THE CONTRACTOR'S SOLE COST AND EXPENSE, ALL SIDEWALKS,
CURBS, PAVEMENT MARKINGS, AND PAVEMENT DAMAGED BY CONSTRUCTION ACTIVITIES WHETHER SPECIFIED ON
THIS PLAN OR NOT.
3. CONTRACTOR IS CAUTIONED OF EXISTING UTILITY SERVICES TO REMAIN IN PROXIMITY TO PROPOSED BOLLARDS AND
SIGNS. CONTRACTOR SHALL PROVIDE FIELD MODIFICATION LOCATIONS OF BOLLARDS AND BOLLARDS WITH SIGNAGE
AS NEEDED TO AVOID CONFLICTS WITH EXISTING UTILITY SERVICES TO REMAIN.
.com
UTILITY NOTES
ROCHESTER, NY 14625
www.BohlerEngineering
(REV. 7/2024)
(585) 866-1100
70 LINDEN OAKS
1. ALL WORK ASSOCIATED WITH UTILITY POLES, OVERHEAD WIRES AND ANY/ALL APPURTENANCES SHALL BE
THIRD FLOOR
COORDINATED BY THE GC WITH THE LOCAL UTILITY COMPANIES PRIOR TO THE ORDERING OF ANY MATERIALS. THIS
MAY INCLUDE BUT IS NOT LIMITED TO THE REMOVAL, INSTALLATION, RELOCATION OR PROTECTION OF ANY BRACING,
GUY WIRES, OVERHEAD WIRES, ETC. AS MAY BE REQUIRED TO ACCOMMODATE THE PROJECT.
2. TRANSFORMERS AND SWITCH GEARS: GC SHALL PROVIDE ALL APPURTENANCES IN ACCORDANCE WITH UTILITY
COMPANY SPECIFICATIONS AND CARRY SAME IN BASE BID. APPURTENANCES SHALL INCLUDE, BUT NOT BE LIMITED
TO, THE CONCRETE PAD, SECONDARY SPILL CONTAINMENT AREAS (IF REQUIRED), BOLLARD / VEHICULAR
Phone:
PROTECTION, AND OTHER ITEMS AS MAY BE REQUIRED BY THE UTILITY PROVIDER FOR INSTALLATION OF THE
TRANSFORMER AND SWITCH GEAR (IF REQUIRED). GC SHALL COORDINATE ALL ASPECTS OF INSTALLATION WITH
UTILITY PROVIDER PRIOR TO ORDERING OF MATERIALS AND NOTIFY DESIGN ENGINEER OF ANY CONFLICTS IN
WRITING.
ORCHARD PARK ROAD
138.00'
N 80°00'37" N
3.5'
4'
4'
22.2' GREEN AREA
PROP EOP
GREEN AREA
PROP EOP
S 09°36'27" E
20'
45.00'
PROP PANEL BOARD,
PROP ASPHALT PAVEMENT (TYP)
45.00'
PROP UTILITY POLE METER, & SWITCHBOARD PROP CANTILEVERED EV
ON 7'X17.25' CONCRETE PAD CHARGING CANOPY
PROPOSED EV CHARGING STATIONS
PROP 4" PAVEMENT STRIPE
PROP 6" PROP STRIPED
PAINTED WHITE (TYP)
BOLLARD (TYP) LOADING AREA
11' 3'R
PROP GRAVEL AREA
WEST SENECA, NY 14224
705 ORCHARD PARK RD
8' 6.6'
8' 10' 10'
18'
18'
PROP 6" GREEN AREA
BOLLARD (TYP)
8'
3'
3'
3.7' 138.00'
PROP TRANSFORMER S 80°00'37" W 12.00'
ON CONCRETE PAD PROP CANOPY COLUMN (TYP) PROP DUAL PORT EV CHARGER
PROP EV CHARGING SIGN PROP EV CHARGING SIGN (TYP)
ON CONRETE PAD (TYP OF 5)
& LAST USE SIGN (TYP)
THIS PLAN TO BE UTILIZED
ALWAYS CALL 811 FOR SITE LAYOUT PURPOSES
It's fast. It's free. It's the law. ONLY
GENERAL NOTE:
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT
WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO
THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN
10 5 2.5 0
1"= 10'
10
C-2.1
WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE
ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN SITE PLAN
FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES.
Page 31 of 1493
Page 32
Page 32 of 1493
Page 33
Page 33 of 1493
Page 34
Page 34 of 1493
Page 35
April 20, 2026
Jeffery Schieber
Code Enforcement Officer
1250 Union Road – Room 210
West Seneca, New York 14224
RE: 2544 Clinton Street – Home Leasing Development
Site Plan Review Application Package
Mr. Schieber:
On behalf of Home Leasing Development, I am pleased to submit a Site Plan Review Application
Package for the proposed affordable multi-family housing project “West Seneca Apartments”,
located on one parcel at 2544 Clinton Street.
Home Leasing is seeking Site Plan Approval to develop the project on an approximately 12.7-acre
site. (TA#124.00-2-5). The project proposes the construction of 75-units spanning across two
buildings – the existing mansion on site (15-units) and a new 3-story multifamily apartment building
(60-units) with associated parking, site and drainage improvements.
The original project was approved by the Town Board for Rezoning, Special Use Permit and SEQR
Negative Declaration on 1/27/2025. The revised layout for the project was approved by the Town
Board for an Amendment to the existing Special Use Permit on 2/9/2026.
This package includes a fully engineered site package for Planning Board Review.
Per Town of West Seneca Code – Site Plan Review Criteria - “Planning Board Actions; project review
criteria” (Code Section 102-12 (A & B)), we offer the following responses:
(1) Conformance with this chapter and other adopted Town plans, an approved development
plan that includes the subject site, if one exists, and all other applicable laws;
To the best of our knowledge, the project is in compliance with all regulations of the R-50 zoning
district and supplemental multifamily housing requirements. Based on the 2016 Comprehensive
Plan – Neighborhoods – Section A, B and C – the plan supports continuing to build affordable
housing with West Seneca.
(2) Compatibility of the proposed development with the natural features of the land and the
environmental attributes of the site;
The project is designed to preserve and avoid disturbance in the environmentally sensitive areas
located on the site. There will be no disturbance within the archeological buffer area and 100-year
floodplain. All development is located in FEMA Zone X and areas of minimal flood hazard.
Development is located away from Cayuga creek to maintaining an existing natural buffer. The site
layout is designed to maintain existing trees/vegetation along Clinton Street and along the perimeter
of the parcel.
Page 35 of 1493
Page 36
(3) The project's compliance with grading and drainage requirements of the Town;
The project is designed to comply with the town standards. Stormwater is designed to meet NYS
Stormwater Design Manual standards, grading and disturbance will be limited to areas as required
for installation of stormwater practices and to achieve positive drainage away from buildings/across
hardscape areas.
(4) The project's compliance with the Town's Flood Damage Prevention Law;
The project is located partially within FEMA Zone X, with the majority of the development sitting
outside of all mapped zones. Per Town Code Section 77-12 – A floodplain development permit is not
required for development within Zone X.
(5) The general layout and design of buildings, lighting, signage, open space and development
features consistent with reasonable planning principles;
The proposed singular new 3-story building (60-units) along with utilizing the existing mansion for an
additional 15-units was chosen to lessen the overall footprint on the property. The existing
landscaping and stone wall are being preserved to the greatest extent possible, providing screening
of the new building and parking lot from Clinton Street. Roads and parking lots have been designed
to meet town standards and allow for proper emergency access.
(6) The location and design of vehicular entrances/exits, including emergency access and fire
lanes, in relation to the street system, traffic circulation and control within the site, and
coordination of access points and circulation with adjoining properties;
The existing entrance to the property is being utilized with minor widening to allow for adequate
space for emergency vehicles. The parking lot and roadways are designed to meet NYS Fire Code
including: fire lanes for aerial apparatus access along two sides of building, fire turnarounds, a
looped parking lot, and two new private fire hydrants.
(7) The provision and protection of pedestrian movement on the site and coordination of
pedestrian movement on adjoining properties and the street system;
Sidewalks are provided throughout the proposed development. All sidewalks (as shown on the plans)
are ADA compliant. Sidewalk access is provided out to Clinton Street and a new segment of sidewalk
within the ROW and extends to the west to the limits of the existing guardrail, in accordance with
previous coordination with NYSDOT.
(8) The location, design, layout and adequacy of parking, loading and stacking areas, including
the provision of opportunities for handicapped parking;
The parking lot provides the code required 170 spaces – including 20 visitor spaces. The submitted
plans proposes 20-banked parking spaces to be constructed in the future if demand requires it. ADA
and EV spaces are provided at both buildings, adjacent to the accessible entrances for the
respective buildings.
(9) Provision of landscaping, screening and buffers to complement development and protect
adjacent uses and public rights-of-way from unsightliness, noise, glare and other nuisances.
Such elements shall also be used to promote the availability of green space in nonresidential
development and recreation space in residential development to avoid a continuous paved
or built environment;
2
Page 36 of 1493
Page 37
The project layout was designed to preserve open space. Existing natural buffers will be maintained
along the north, east and west boundaries of the site. Trees along the south (Clinton Street) will be
maintained – other than removal required for the widening of the driveway. A patio area and
playground are provided, along with landscaped islands throughout the parking lot. Trees will be
added along the entrance drive to provide additional screening of the new development from Clinton
Street.
(10) Adequate provision of drainage and stormwater management facilities;
A Stormwater Pollution Prevention Plan (SWPPP) was prepared for the site and is included in this
submission package. The site is designed per the NYS Stormwater Design Manual standards and
NYSDEC Standards and Specifications for Erosion and Sediment Control. Several stormwater
practices are proposed for the site including bioretention areas, underground stormwater chambers
and use of a hydrodynamic separator (water quality unit).
(11) Adequacy of sewer and water facilities, fire protection and conformance with Town
regulations for the provision and construction of those services;
A full sewer report (including flow testing) has been completed. Findings of the monitoring was
reviewed and approved by Erie County Sewer, concluding that the sewer has sufficient capacity to
support the proposed project. Existing flow tests for the watermain on Clinton Street have been
reviewed and it was determined that the existing watermain has sufficient pressure to support the
proposed project. Both buildings will be designed to meet NYS Fire Code (for rehabilitation of the
existing building and new construction).
(12) Where appropriate and applicable, the concurrence of Town agencies, New York State
Department of Transportation, New York State Department of Environmental Conservation
and other county or state agencies, as appropriate; and
Correspondence with reviewing agencies will be/has been provided to the town as a part of the site
plan review. To date NYSDOT and SHPO correspondence was provided as part of SEQR review and
issuance of the Special Use Permit.
(13) Meeting the requirements for a site plan, as identified in this chapter.
This application package as submitted meets the requirements of the Town Code, to the best of our
knowledge.
Included for your consideration in the Site Plan Review are the following items:
• Site Plan Application
• Civil Plan Set
• Architectural Elevations & Rendering
• Preliminary ALTA
• Engineering Report
• SWPPP
• Check – Review Fee (mailed separately)
3
Page 37 of 1493
Page 38
We look forward to presenting this project to the Planning Board on May 14th, 2026. If you have any
questions or need any additional information, please feel free to contact me at 585-770-2525 or
[email protected].
Respectfully submitted,
LaBella Associates
Shelby Vakiener, Civil Engineer
4
Page 38 of 1493
Page 39
4/20/2026
West Seneca Apartments
2544 Clinton Street - Nearest cross street - Lakeside Court ( +/- 750 LF to the East)
Home Leasing - (contact - Angela Eicholtz) (248) 978-4420
45 East Avenue, 2nd Floor, Rochester, NY 14604
Clinton Street Realty Holdings
Labella Associates DPC - (contact - Shelby Vakiener) (585) 454-6110
300 Pearl Street, Suite 130, Buffalo, NY 14202
124.00-2-5
Construction of a new multifamily housing project with 75 total units. Includes a new +/- 75,900 SF building with 60 units and the re-purposing of the
existing mansion on site with 15 units. Also includes, driveway, parking, stormwater management facilities
12.7 (to creek CL) N/A
Clinton Street: +/- 205 LF of frontage
R-50 R-50
Commercial
Residential - Mutlifamily
Zoning: R75(S), R-100 A, R-100A(S), C-2, C-2(S)
Uses include: 1 Family Residential, 2 Family Residential, Residential vacant land, Residential w/ community use, warehouse, converted residential
X X
Special Use Permit - Issued by Town Board on 2/9/2026
Page 39 of 1493
Page 40
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
Page 40 of 1493
Page 41
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
Page 41 of 1493
Page 42
SV
FUTURE
FUTURE
SV
SV
SV
SV
SV
SV
SV
SV
SV
Shelby Vakiener - agent for applicant West Seneca Apartments
2544 Clinton Street
Page 42 of 1493
Page 43
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
FUTURE
Page 43 of 1493
Page 44
SV
SV
SV
SV
n/a
SV
SV
SV
SV
n/a
n/a
SV
SV
SV
n/a
SV
Page 44 of 1493
Page 45
SV
SV
FUTURE
SV
Page 45 of 1493
Page 46
Page 46 of 1493
Page 47
ISSUED FOR SITE PLAN APPROVAL
WEST SENECA APARTMENTS
2544 CLINTON ST,
WEST SENECA, NY 14224
APRIL 2026
PROJECT LOCATION
PROJECT NO: 2241067
HOME LEASING
LOCATION MAP
N.T.S.
2544 CLINTON ST, WEST SENECA, NY 14224
HOME LEASING
75 S CLINTON AVE SUITE 700,
WEST SENECA APARTMENTS
ROCHESTER, NEW YORK 14604
PROJECT NO: 2241067
APRIL 2026
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
Page 47 of 1493
Page 48
NOT FOR CONSTRUCTION
GENERAL NOTES UTILITY NOTES LEGEND
1. THE CONTRACTOR ALONE SHALL BE RESPONSIBLE TO LOCATE UTILITIES OUTSIDE THE 1. CONTRACTOR SHALL COORDINATE INSTALLATION OF WATER MAIN / WATER SERVICE
RIGHT-OF-WAY INCLUDING PRIVATE ROADS. WITH ERIE COUNTY WATER AUTHORITY AND THE ERIE COUNTY HEALTH DEPARTMENT EXISTING PROPOSED DESCRIPTION EXISTING PROPOSED DESCRIPTION
(ECDOH). NO WORK SHALL BEGIN ON THE WATER MAIN / WATER SERVICE WITHOUT
2. SITE DRAINAGE, INCLUDING THE PROJECT SITE AND ADJACENT PRIVATE AND PUBLIC
ECWA AND ECDOH SIGNATURES ON THE UTILITY PLAN.
ROADWAYS, DRIVES, PARKING AREAS OR PROPERTIES SHALL BE MAINTAINED FLOODZONE END SECTION
300 Pearl Street, Suite 130
THROUGHOUT THE CONSTRUCTION PERIOD. 2. CONTRACTOR SHALL COORDINATE INSTALLATION OF SANITARY MAIN / SANITARY
SERVICE WITH ERIE COUNTY PURE WATERS (ECPW). NO WORK SHALL BEGIN ON THE ARCHAEOLOGICAL BUFFER CATCH BASIN Buffalo, NY 14202
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING ALL MATERIALS, TOOLS AND 716-551-6281
SANITARY MAIN / SANITARY SERVICE WITHOUT ECPW SIGNATURE ON THE UTILITY PLAN.
EQUIPMENT, INCLUDING SPECIAL CUTTING DEVICES, NECESSARY TO PERFORM THE TREE REMOVAL Y DRAIN BASIN
WORK CONTAINED IN THIS CONTRACT.
X X X X UTILITY REMOVAL C INLET MANHOLE
labellapc.com
4. THE SIZES AND MATERIAL OF CONSTRUCTION OF WATER MAINS, SANITARY SEWERS AND
STORM SEWERS TO REMAIN ARE REPUTED. THE CONTRACTOR SHALL VERIFY SIZES OF SAWCUT D D STORM MANHOLE
ALL UTILITIES WHERE CONNECTIONS TO SAID EXISTING UTILITIES ARE REQUIRED.
EXCAVATION TO VERIFY THESE UTILITIES SHALL BE MADE AT NO ADDITIONAL COST TO
GRADING NOTES TREE PROTECTION S SANITARY MANHOLE
THE OWNER.
1. THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS OF OSHA, AND ANY OTHER
AGENCY HAVING JURISDICTION WITH REGARD TO SAFETY PRECAUTIONS WITH CHAIN LINK FENCE S INLET DRYWELL
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING SITE AMENITIES NOT DESIGNATED FOR
REMOVAL. TRENCHING OPERATIONS. THE REQUIREMENTS SET FORTH HEREIN ARE INTENDED TO
BOARD-ON-BOARD FENCE C0
CLEAN OUT
SUPPLEMENT REQUIREMENTS ESTABLISHED BY THESE AGENCIES. IN THE CASE OF A
6. UNLESS OTHERWISE INDICATED ON THE PLANS OR DIRECTED BY THE CONFLICT BETWEEN REQUIREMENTS OF OTHER JURISDICTIONAL AGENCIES AND THESE
GUARD RAIL DS DOWN SPOUT
ARCHITECT/ENGINEER, THE CONTRACTOR IS RESPONSIBLE FOR PRESERVING AND DOCUMENTS, THE MORE STRINGENT REQUIREMENT ON THE CONTRACTOR SHALL APPLY.
PROTECTING FROM DAMAGE ALL TREES, SHRUBS AND PLANTS IN THE VICINITY OF THE
2. SHEETING, IF REQUIRED DURING CONSTRUCTION, IS CONSIDERED TO BE PART OF THIS TREE/VEGETATION LIMIT HYDRANT
PROPOSED WORK.
CONTRACT AND SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
7. THE CONTRACTOR SHALL PROTECT AND SUPPORT ALL EXISTING UTILITIES DESIGNATED BLDG BUILDING/STRUCTURE VALVE
TO REMAIN FOR THE DURATION OF THE CONTRACT. 3. ALL TRENCHES THROUGH PAVEMENT SHALL BE SAW CUT PRIOR TO EXCAVATION AND
AGAIN PRIOR TO PAVEMENT RESTORATION. PROPERTY LINE FLOW ARROW
8. ANY SITE AMENITY, UTILITY, STREET APPURTENANCE, OR OTHER ITEM WHICH BECOMES EXP: EXP:
DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR 4. CONTRACTOR SHALL ADJUST THE RIMS OF ALL MANHOLES, CATCH BASINS, VALVE EASEMENTS TELEPHONE LINE
REPLACED IN-KIND BY THE CONTRACTOR AS DETERMINED BY THE PROJECT MANAGER BOXES AND OTHER UTILITY SITE STRUCTURES TO MEET FINISHED GRADE IN AREAS
OR ARCHITECT/ENGINEER AND AT NO ADDITIONAL COST TO THE OWNER. REQUIRING REPAVING OR REGRADING AS PART OF THE WORK, INCLUDING THOSE THAT RIGHT-OF-WAY OVERHEAD ELECTRIC CERTIFICATE OF AUTHORIZATION NUMBER:
MAY NOT BE SHOWN ON THE PLANS. PROFESSIONAL ENGINEERING: 0021272
RETAINING WALL UE UE UNDERGROUND ELECTRIC LAND SURVEYING: 0021271
5. VOIDS LEFT BY UTILITY OR STRUCTURE REMOVAL OR GRUBBING OPERATIONS SHALL BE
GEOLOGICAL: 0021659
BACKFILLED AND PROPERLY COMPACTED WITH STRUCTURAL FILL (NYSDOT ITEM 304.12) BOLLARD GAS LINE
SURVEY NOTES IN AREAS UNDER AND WITHIN 5 FEET HORIZONTALLY OF ALL STRUCTURES, BUILDINGS
AND PAVEMENTS. IN GRASSED AREAS, VOIDS LEFT SHALL BE FILLED AND PROPERLY FLAG
FLAG POLE
POLE SA SANITARY LINE
COMPACTED WITH SUITABLE ON-SITE OR IMPORTED EARTHEN BACKFILL. ALL It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO
DISTURBED AREAS SHALL BE RESTORED. SIGN ST STORM LINE Sec. 7307, for any person, unless acting under the direction of a licensed
ALLOWANCE WILL BE MADE FOR ADDITIONAL COSTS DUE TO CONTRACTOR'S FAILURE TO
architect, professional engineer, or land surveyor, to alter an item in any
VERIFY EXISTING CONDITIONS. 6. THE CONTRACTOR SHALL DEWATER ALL EXCAVATIONS TO PREVENT THE INTRODUCTION DECIDUOUS TREE UD UD UD STORM UNDERDRAIN PIPE way. If an item bearing the seal of an architect, engineer, or land surveyor
OF GROUNDWATER INTO THE TRENCHES/EXCAVATIONS. PROVIDE ALL EQUIPMENT is altered; the altering architect, engineer, or land surveyor shall affix to
2. THE CONTRACTOR SHALL LOCATE, MARK, SAFEGUARD AND PRESERVE ALL SURVEY
NECESSARY TO MAINTAIN THE GROUNDWATER LEVEL AS NECESSARY. CONIFEROUS TREE the item their seal and notation "altered by" followed by their signature and
MARKERS AND RIGHT-OF-WAY MARKERS IN THE AREA OF CONSTRUCTION. FS WATER FIRE SERVICE LINE
7. THE CONTRACTOR SHALL PLACE AT MINIMUM 6 INCHES OF CLEANED SCREENED date of such alteration, and a specific description of the alteration.
3. ANY IRON PINS, MONUMENTS OR OTHER ITEMS DEFINING PROPERTY LINES WHICH ARE TREE STUMP W WATER LINE
TOPSOIL IN ALL DISTURBED AREAS PRIOR TO SEEDING.
DISTURBED BY CONSTRUCTION OPERATIONS SHALL BE PROPERLY TIED AND
ACCURATELY RESET BY A NYS LICENSED SURVEYOR UPON COMPLETION OF THE WORK. OUTLET PROTECTION 510 MAJOR CONTOUR © 2024
2026 LaBella Associates
4. HORIZONTAL DATUM BASED OFF NAD83. BIORETENTION 509 MINOR CONTOUR
5. VERTICAL BASED OFF OF NAVD88.
EROSION AND SEDIMENT CONTROL NOTES BOLLARD LIGHT POLE ℄ OF DRAINAGE SWALE
LIGHT POLE
1. ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH NEW YORK EROSION FENCE
DEMOLITION NOTES STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL, AND LOCAL
GOVERNING SOIL AND WATER CONSERVATION AGENCY RECOMMENDATIONS AND
SINGLE
LIGHT POLE DOUBLE FLOW/SLOPE DIRECTION
HOME LEASING
STANDARDS. CONTRACTOR SHALL SUBMIT PROPOSED EROSION CONTROL PLAN 75 S CLINTON AVE SUITE 700,
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO UTILITY POLE
INCLUDING SEQUENCING OF WORK TO THE ENGINEER FOR REVIEW PRIOR TO START OF SILT SOCK INLET PROTECTION ROCHESTER, NEW YORK 14604
ALLOWANCE WILL BE MADE FOR ADDITIONAL COSTS DUE TO CONTRACTOR'S FAILURE TO
WORK.
VERIFY EXISTING CONDITIONS AND DIMENSIONS. HH HANDHOLE SILT FENCE INLET PROTECTION
2. UTILIZE CONSTRUCTION METHODS/TECHNIQUES, WHICH WILL LIMIT THE EXPOSED
2. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY DIG SAFE
EARTHEN AREAS AND MINIMIZE THE EFFECT OF EARTH DISTURBANCE ACTIVITIES ON SOIL E MANHOLE CHECK DAM
NEW YORK AT 811 TO REQUEST UTILITY STAKEOUT OF ALL PUBLIC UTILITIES.
EROSION. THE AREA OF DISTURBANCE SHALL BE LIMITED TO A MAXIMUM OF 5 ACRES
3. WORK ASSOCIATED WITH THIS CONTRACT WILL OCCUR AT AN ACTIVE AND FUNCTIONAL UNLESS OTHERWISE APPROVED BY THE ENGINEER.
FACILITY. CONTRACTOR SHALL COORDINATE WITH THE OWNER TO MINIMIZE DISRUPTION
3. ALL SEDIMENTATION BARRIERS AND OTHER TEMPORARY OR PERMANENT MEASURES STABILIZED CONSTRUCTION ENTRANCE
TO THE OPERATIONS OF THE FACILITY. CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO
SHALL BE IN PLACE PRIOR TO THE START OF CONSTRUCTION. PLANS SHOW THE
PROVIDE A SAFE WORK SITE AND TO PROTECT THE PUBLIC, VISITORS AND EMPLOYEES
SUGGESTED MINIMUM MEASURES REQUIRED.
FROM HARM AS A RESULT OF HIS CONSTRUCTION ACTIVITIES.
4. REMOVAL OF ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES
4. THE HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING ABOVE GROUND AND
SHALL BE COMPLETED AT THE APPROVAL OF THE OWNER AND ENGINEER. THE COST OF
BELOW GROUND UTILITIES, STRUCTURES, AND APPURTENANCES SHOWN ON THE PLANS
REMOVING THESE MEASURES SHALL ALSO BE INCLUDED IN THE BID PRICE.
ARE APPROXIMATE AND ARE NOT GUARANTEED. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DETERMINING THE EXACT HORIZONTAL AND VERTICAL LOCATION OF 5. FOR THE DURATION OF THE PROJECT, THE CONTRACTOR SHALL PROTECT ALL ON-SITE,
ALL UTILITIES, STRUCTURES, AND APPURTENANCES IN THE PATH OF AND ADJACENT TO ADJACENT AND/OR DOWNSTREAM STORM/SANITARY SEWERS, AND/OR OTHER WATER
THE PROPOSED WORK. COURSES FROM CONTAMINATION BY WATER BORNE SILTS, SEDIMENTS, FUELS,
SOLVENTS, LUBRICANTS OR OTHER POLLUTANTS ORIGINATING FROM ANY WORK DONE
5. SITE DRAINAGE, INCLUDING THE PROJECT SITE AND ADJACENT PRIVATE AND PUBLIC
ON, OR IN SUPPORT OF THIS PROJECT.
ROADWAYS, DRIVES, PARKING AREAS OR PROPERTIES SHALL BE MAINTAINED
THROUGHOUT THE CONSTRUCTION PERIOD. 6. DURING CONSTRUCTION NO WET OR FRESH CONCRETE OR LEACHATE SHALL BE
ALLOWED TO ESCAPE INTO STORM/SANITARY SEWERS, DITCHES OR OTHER WATERS OF
6. CONTRACTOR SHALL PROTECT AND SUPPORT ALL EXISTING UTILITIES DESIGNATED TO
REMAIN FOR THE DURATION OF THE CONTRACT.
NEW YORK STATE, NOR SHALL WASHINGS FROM CONCRETE TRUCKS, MIXERS OR OTHER
DEVICES BE ALLOWED TO ENTER ANY STORM/SANITARY SEWERS, DITCHES, RIVERS, OR
DRAWING INDEX
7. THE CONTRACTOR SHALL NOTIFY THE LOCAL GOVERNMENT, LOCAL FIRE DEPARTMENT WATER COURSES.
AND THE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION (NYSDEC)
7. ALL EXCAVATED OR IMPORTED EARTHEN STOCKPILES SHALL BE SUITABLY STABILIZED
C001 GENERAL NOTES, LEGEND, AND DRAWING INDEX
AS NECESSARY AND SHALL OBTAIN ANY REQUIRED PERMITS PRIOR TO BEGINNING
WORK. COPIES OF ANY REQUIRED PERMITS SHALL BE PROVIDED TO THE OWNER PRIOR
AND PROTECTED BY SILT FENCE SO THAT IT CANNOT REASONABLY ENTER ANY WATER WEST SENECA APARTMENTS
BODY, OR STORM OR SANITARY SEWER.
TO BEGINNING THE WORK. C003 TOTAL LAND HOLDINGS 2544 CLINTON ST,
8. ALL METHODS AND EQUIPMENT PROPOSED BY THE CONTRACTOR TO ACCOMPLISH THE WEST SENECA, NY 14224
8. CONTRACTOR SHALL REMOVE FROM SITE, MATERIALS NOT INDICATED TO BE SALVAGED
WORK FOR EROSION AND POLLUTION CONTROL SHALL BE SUBJECT TO APPROVAL OF
INCLUDING ALL DEBRIS. ALL REMOVED MATERIALS SHALL BECOME THE PROPERTY OF
THE ENGINEER. C101 EXISTING CONDITIONS AND DEMOLITION PLAN
CONTRACTOR WHO SHALL LEGALLY DISPOSE OF SAME.
9. THE CONTRACTOR SHALL BE REQUIRED TO TREAT TRAVELED AREAS TO CONTROL DUST.
9. ALL TREES, SHRUBS AND PLANTS DESIGNATED TO REMAIN AND DISTURBED BY
CONSTRUCTION OPERATIONS, SHALL BE REPLACED IN-KIND AS DIRECTED BY THE
WATER SHALL BE APPLIED TO SUCH TRAVELED AREAS AS THE ARCHITECT/ENGINEER OR C102 EXISTING CONDITIONS AND DEMOLITION PLAN
OWNER'S DESIGNATED REPRESENTATIVE MAY DESIGNATE. THE NUMBER OF
ARCHITECT/ENGINEER AND/OR OWNER'S DESIGNATED REPRESENTATIVE AT NO
APPLICATIONS AND THE AMOUNT OF WATER SHALL BE BASED UPON FIELD AND
ADDITIONAL COST TO THE OWNER.
WEATHER CONDITIONS. C200 OVERALL SITE PLAN
10. THE CONTRACTOR SHALL MAINTAIN SAFE VEHICULAR AND PEDESTRIAN ACCESS TO THE
10. ALL AREAS OF SOIL DISTURBANCE RESULTING FROM THIS PROJECT WHICH WILL NOT BE
EXISTING BUILDINGS FOR THE DURATION OF THE CONTRACT.
SUBJECT TO FURTHER EARTHWORK OR CONSTRUCTION ACTIVITIES SHALL BE
11. WHEN EXISTING CONSTRUCTION WHICH IS TO REMAIN IS DAMAGED DURING THE PERMANENTLY SEEDED TO ESTABLISH GRASS, AND MULCHED WITH HAY OR STRAW C201 SITE PLAN
COURSE OF CONSTRUCTION AS A RESULT OF CONTRACTORS WORK, IT SHALL BE WITHIN ONE WEEK OF FINAL DISTURBANCE. MULCH SHALL BE MAINTAINED UNTIL A
REPAIRED AND/OR REPLACED WITH SIMILAR OR LIKE MATERIALS AS MUCH AS POSSIBLE, SUITABLE VEGETATIVE COVER IS ESTABLISHED. NO: DATE: DESCRIPTION:
AT NO COST TO THE OWNER. ALL REPAIRS AND/OR REPLACEMENTS WILL BE SUBJECT TO
C202 SITE PLAN
11. CONTRACTOR STAGING AREAS AND CONSTRUCTION ENTRANCE LOCATIONS SHALL BE Revisions
OWNERS APPROVAL.
COORDINATED WITH THE OWNER PRIOR TO START OF CONSTRUCTION. STABILIZED
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C001 GENERAL NOTES.dwg
12. COORDINATE LOCATION OF TEMPORARY CONSTRUCTION FENCE AND TEMPORARY STONE CONSTRUCTION ENTRANCE(S), AS SHOWN ON THE PLANS SHALL BE PROVIDED. ALL C203 FIRE TRUCK AND SITE EMERGENCY ACCESS PLAN
STAGING AREA WITH OWNER DISTURBED AREAS SHALL BE RESTORED. PROJECT NUMBER:
2241067
12. ALL CATCH BASINS/DRAINAGE INLETS SHALL HAVE STONED INLET PROTECTION AROUND C301 UTILITY PLAN
SITE NOTES THEM AND GEOTEXTILE FABRIC OVER THE GRATE TO PREVENT SEDIMENTATION FROM
ENTERING THE STORM SYSTEM.
DRAWN BY:
EMM / SCB
1. WELL COMPACTED SUBGRADE SHALL BE UTILIZED UNDERNEATH CONSTRUCTION OF 13. TILL ALL COMPACTED SOILS LOCATED IN LAWN AREAS TO RESTORE THE ORIGINAL C302 UTILITY PLAN REVIEWED BY:
PAVEMENT AND CONCRETE BASES. PROPERTIES OF THE SOIL PRIOR TO SEEDING. SRV / DPB
2. ALL STAKEOUT FOR THE PROPOSED SITE IMPROVEMENTS SHALL BE COMPLETED BY A
C401 GRADING, EROSION, AND SEDIMENT CONTROL PLAN ISSUED FOR:
NEW YORK STATE LICENSED LAND SURVEYOR. SITE PLAN APPROVAL
3. IF ANY DISCREPANCIES ARE NOTED BETWEEN THESE CONSTRUCTION DOCUMENTS AND
INFORMATION PROVIDED OR AN ERROR IS SUSPECT, IT SHALL BE IMMEDIATELY C402 GRADING, EROSION, AND SEDIMENT CONTROL PLAN DATE:
REPORTED TO THE CONSTRUCTION MANAGER AND LABELLA ASSOCIATES PROJECT 4/20/2026
MANAGER IN WRITING.
C501 CONSTRUCTION DETAILS DRAWING NAME:
4. ANY PROOF-ROLLING OF EXPOSED SUBBASE BY A MINIMUM 10 TON SMOOTH DRUM
ROLLER SHALL BE DONE UNDER THE GUIDANCE OF, AND OBSERVED BY, QUALIFIED
ENGINEERING PERSONNEL PRIOR TO PLACEMENT OF SUBBASE MATERIAL. THE ROLLER C502 CONSTRUCTION DETAILS
SHOULD BE OPERATED IN THE STATIC MODE AND COMPLETE AT LEAST TWO (2) PASSES
OVER THE EXPOSED SUBGRADES.
5. EXISTING WETLANDS DELINEATED BY XXXX ON XX/XX/XXXX.
C503 CONSTRUCTION DETAILS GENERAL NOTES, LEGEND,
6. PARCEL LINES AS SHOWN BY XXXX COUNTY GIS DATABASE, FOR THE TOWN OF XXXX.
C504 CONSTRUCTION DETAILS AND DRAWING INDEX
C505 CONSTRUCTION DETAILS
C506 CONSTRUCTION DETAILS
DRAWING NUMBER:
C507 CONSTRUCTION DETAILS
4/20/2026 1:17:05 PM
C508 CONSTRUCTION DETAILS
L501 LANDSCAPE DETAILS
C001
Page 48 of 1493
Page 49
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
C0
D
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SEE SHEETS:
© 2024
2026 LaBella Associates
C101
C201
HOME LEASING
C301 75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
C401
PROPOSED
3-STORY C0
BUILDING C0
± 25,000 SF FOOTPRINT
C0
C0
C0
S
C0
D D
C0 D D
SEE SHEETS:
C0
DS
C102 WEST SENECA APARTMENTS
C202 2544 CLINTON ST,
WEST SENECA, NY 14224
DS
C302
C0
C402
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C003 OVERALL SITE PLAN.dwg
D
15.7'
NO: DATE: DESCRIPTION:
Revisions
C0
PROJECT NUMBER:
2241067
D
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
TOTAL LAND HOLDINGS
N
1 TOTAL LAND HOLDINGS 0' 60' 120' 180'
C003 SCALE: 1" = 60'
DRAWING NUMBER:
4/20/2026 1:17:07 PM
C003
Page 49 of 1493
Page 50
DEMOLITION KEY NOTES
NOT FOR CONSTRUCTION
1 REMOVE AND DISPOSE OF ASPHALT PAVEMENT SECTION, FULL DEPTH
REMOVE AND DISPOSE OF BUILDING, STRUCTURES, AND FOUNDATIONS
2 (REFER TO ARCHITECTURAL DRAWINGS AND SOIL MANAGEMENT PLAN
(SMP) FOR WORK WITHIN ARCHAEOLOGICAL BUFFER AREA)
3 REMOVE AND DISPOSE OF CONCRETE SIDEWALK SECTION, FULL DEPTH 300 Pearl Street, Suite 130
Buffalo, NY 14202
4 FULL DEPTH SAWCUT
716-551-6281
5 REMOVE AND DISPOSE OF TREE AND STUMP labellapc.com
6 REMOVE AND DISPOSE OF STUMP 15
REMOVE EXISTING UNDERGROUND UTILITY. EXACT EXTENTS OF UTILITY
7 X X
REMOVAL TO BE DETERMINED IN FIELD.
8 REMOVE EXISTING UTILITY STRUCTURE
9 REMOVE AND DISPOSE OF MOUNTED BUILDING LIGHTS(TYP.)
2
10 REMOVE AND DISPOSE OF MAILBOX
REMOVE AND PROTECT PORTION OF EXISTING STONE WALL FOR
11
REINSTALLATION
12 REMOVE AND DISPOSE OF GATE EXP: EXP:
13 PROTECT EXISTING TREE
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
14 PROTECT EXISTING UTILITY
LAND SURVEYING: 0021271
PROTECT EXISTING FENCE. FENCE TO BE EVALUATED BY OWNER. SECTIONS GEOLOGICAL: 0021659
15
TO BE REPLACED AS DETERMINED BY OWNER.
16 REMOVE AND DISPOSE OF EXISTING FLAG POLE AND FOUNDATION It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
17 REMOVE AND DISPOSE OF EXISTING SIGN architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
18 REMOVE AND DISPOSE OF EXISTING HVAC UNITS
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
19 PROTECT EXISTING STONE WALL
© 2024
2026 LaBella Associates
DEMOLITION PLAN NOTE:
1. ALL STUMPS AND BRUSH MAY NOT BE BURIED IN THE TOWN AND TOPSOIL MAY NOT
BE REMOVED FROM THE WORK SITE WITHOUT A PERMIT.
6
2
HOME LEASING
15
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
X
1
X
X
X
X
X
7
X
X
X
X
X
X
X
X
7
X
X
5
X
X
X
X
X
WEST SENECA APARTMENTS
X
X
X
2544 CLINTON ST,
X
X
8
WEST SENECA, NY 14224
X
X
2
X
5
3
15
1 NO: DATE: DESCRIPTION:
Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C100 DEMO PLAN.dwg
PROJECT NUMBER:
2241067
15 DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
1
DRAWING NAME:
EXISTING CONDITIONS AND
DEMOLITION PLAN
MATCH TO SHEET: C102
6
17
DRAWING NUMBER:
4/20/2026 1:17:39 PM
N
1 EXISTING CONDITIONS AND DEMOLITION PLAN 0' 20' 40' 60'
C101 SCALE: 1" = 20'
C101
Page 50 of 1493
Page 51
NOT FOR CONSTRUCTION
MATCH TO SHEET: C101
6
300 Pearl Street, Suite 130
17 Buffalo, NY 14202
716-551-6281
labellapc.com
6
DS
3
15
5
1
3
3
18
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
DS PROFESSIONAL ENGINEERING: 0021272
9
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
9 way. If an item bearing the seal of an architect, engineer, or land surveyor
3 7
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
X
10
3
X
© 2024
2026 LaBella Associates
X
X
X
X
X
HOME LEASING
T
X
1
75 S CLINTON AVE SUITE 700,
X
X
ROCHESTER, NEW YORK 14604
X
X
X
X
X
X 7
X
X
X
X
X
T
X
X
X
X
X
X
X
X
8
T
9
FLAG
POLE 15
15
WEST SENECA APARTMENTS
T
2544 CLINTON ST,
WEST SENECA, NY 14224
DEMOLITION KEY NOTES
T
1 REMOVE AND DISPOSE OF ASPHALT PAVEMENT SECTION, FULL DEPTH
REMOVE AND DISPOSE OF BUILDING, STRUCTURES, AND FOUNDATIONS
2 (REFER TO ARCHITECTURAL DRAWINGS AND SOIL MANAGEMENT PLAN
(SMP) FOR WORK WITHIN ARCHAEOLOGICAL BUFFER AREA)
3 REMOVE AND DISPOSE OF CONCRETE SIDEWALK SECTION, FULL DEPTH
4 FULL DEPTH SAWCUT 11 12
T
11 NO: DATE: DESCRIPTION:
Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C100 DEMO PLAN.dwg
5 REMOVE AND DISPOSE OF TREE AND STUMP
11 19 14
19 11
6 REMOVE AND DISPOSE OF STUMP PROJECT NUMBER:
REMOVE EXISTING UNDERGROUND UTILITY. EXACT EXTENTS OF UTILITY
2241067
14 ±18'
7 X X
REMOVAL TO BE DETERMINED IN FIELD. ±21'
19 DRAWN BY:
8 REMOVE EXISTING UTILITY STRUCTURE EMM / SCB
19
REVIEWED BY:
SRV / DPB
9 REMOVE AND DISPOSE OF MOUNTED BUILDING LIGHTS(TYP.) ±85'
4 ISSUED FOR:
10 REMOVE AND DISPOSE OF MAILBOX SITE PLAN APPROVAL
REMOVE AND PROTECT PORTION OF EXISTING STONE WALL FOR DATE:
11
REINSTALLATION 4/20/2026
12 REMOVE AND DISPOSE OF GATE DRAWING NAME:
13 PROTECT EXISTING TREE
14 PROTECT EXISTING UTILITY
15
PROTECT EXISTING FENCE. FENCE TO BE EVALUATED BY OWNER. SECTIONS
TO BE REPLACED AS DETERMINED BY OWNER.
EXISTING CONDITIONS AND
16 REMOVE AND DISPOSE OF EXISTING FLAG POLE AND FOUNDATION DEMOLITION PLAN
17 REMOVE AND DISPOSE OF EXISTING SIGN
18 REMOVE AND DISPOSE OF EXISTING HVAC UNITS
DRAWING NUMBER:
19 PROTECT EXISTING STONE WALL
DEMOLITION PLAN NOTE:
4/20/2026 1:17:13 PM
1. ALL STUMPS AND BRUSH MAY NOT BE BURIED IN THE TOWN AND TOPSOIL MAY NOT N
BE REMOVED FROM THE WORK SITE WITHOUT A PERMIT.
1 EXISTING CONDITIONS AND DEMOLITION PLAN 0' 20' 40' 60'
C102 SCALE: 1" = 20'
C102
Page 51 of 1493
Page 52
NOT FOR CONSTRUCTION
C201
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
C0
D
labellapc.com
±103'
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
PROPOSED architect, professional engineer, or land surveyor, to alter an item in any
3-STORY C0
way. If an item bearing the seal of an architect, engineer, or land surveyor
BUILDING is altered; the altering architect, engineer, or land surveyor shall affix to
C0
the item their seal and notation "altered by" followed by their signature and
± 25,000 SF FOOTPRINT date of such alteration, and a specific description of the alteration.
±103'
C0
© 2024
2026 LaBella Associates
C0
C0
S
C0
HOME LEASING
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
D D
C0 D D
C202 C0
DS
±445'
DS
25-FT SIDE SETBACK
WEST SENECA APARTMENTS
C0
2544 CLINTON ST,
WEST SENECA, NY 14224
PROJECT DATA
PARCEL INFORMATION
APPLICANT HOME LEASING
PARCEL ADDRESS 2544 CLINTON STREET
SLB # 124.00-2-5
D PARCEL AREA (TOTAL) 12.7 ACRES
15.7'
TOTAL PROJECT AREA ±7.0 ACRES
EXISTING IMPERVIOUS NO: DATE: DESCRIPTION:
1.06 ACRES
WITHIN PROJECT AREA Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C200 SITE PLAN.dwg
C0
PROPOSED IMPERVIOUS
2.98 ACRES
WITHIN PROJECT AREA
PROJECT NUMBER:
TOTAL DISTURBANCE AREA ±5.7 ACRES
2241067
ZONING INFORMATION
DRAWN BY:
REQUIRED PROPOSED EMM / SCB
D CLASSIFICATION R-50 R-50 REVIEWED BY:
SRV / DPB
FRONT SETBACK 30 FT ±445 FT
ISSUED FOR:
30-FT FRONT SETBACK SIDE SETBACK 25-FT* ±103 FT
SITE PLAN APPROVAL
REAR SETBACK 40-FT** ±255 FT
DATE:
OPEN SPACE - 8.5 ACRES
4/20/2026
MAX BUILDING HEIGHT 40 FT ±37 FT
DRAWING NAME:
TOTAL APARTMENT UNITS 75
PARKING INFORMATION
REQUIRED PROPOSED
170 (INCLUDING 20
PARKING SPACES 170
BANKED SPACES)
*OR A DISTANCE EQUAL TO THE HEIGHT OF PRINCIPAL BUILDING, WHICHEVER IS
OVERALL SITE PLAN
GREATER.
**FOR MULTIFAMILY DWELLINGS, EACH SIDE YARD SHALL BE 25 FEET OR A
DISTANCE EQUAL TO ONE-HALF (1/2) THE HEIGHT OF SUCH BUILDING, WHICHEVER
IS GREATER. THE TOTAL OF THE TWO SIDE YARDS SHALL BE TWICE THAT REQUIRED
FOR ONE SIDE YARD. THE TOWN BOARD SHALL HAVE THE POWER TO REDUCE SAID
SIDE YARD REQUIREMENTS UPON SHOWING OF SPECIAL CIRCUMSTANCES OR
HARDSHIP.
***MULTIFAMILY DEVELOPMENTS REQUIRE VISITOR PARKING. BASED ON UNIT DRAWING NUMBER:
COUNT (74), 20 VISITOR SPACES ARE REQUIRED FOR THIS COMMUNITY.
4/20/2026 1:17:19 PM
N
1 OVERALL SITE PLAN 0' 40' 80' 120'
C200 SCALE: 1" = 40'
C200
Page 52 of 1493
Page 53
NOT FOR CONSTRUCTION
SITE KEY NOTES
SIGN SUMMARY
1 NEW STANDARD DUTY ASPHALT PAVEMENT NUMBER NAME IMAGE SIZE MUTCD NUMBER QUANTITY
COLORS
NEW YORK STATE
2 NEW CONCRETE SIDEWALK BLACK LETTERING ON
1b 'HANDICAP' 12" x 18" SYMBOL 6
WHITE BACKGROUND
S:\MFriedle\blueicon.jpg
3 NEW CONCRETE DUMPSTER PAD, SEE DETAIL STANDARD 30' 300 Pearl Street, Suite 130
20'
NO PARKING NO
PARKING RED LETTERING ON Buffalo, NY 14202
4 NEW CONCRETE PAD FOR TRASH COLLECTION 2b ANY 12" x 18" R7-1 3 716-551-6281
SIGN TIME WHITE BACKGROUND
5 NEW CONCRETE GENERATOR/TRANSFORMER PAD, SEE DETAIL labellapc.com
RED SIGN WITH WHITE 29 R2
6 NEW PATIO AREA 3 STOP SIGN 30" x 30" R1-1 4 8'
LETTERING
C0
D
7 NEW CONCRETE CURB
ELECTRIC BLACK LETTERING ON 66'
8 NEW FLUSH CONCRETE CURB
4 EV PARKING VEHICLE 12" x 18" 8
PARKING
ONLY WHILE
CHARGING
WHITE BACKGROUND
9 NEW CURB TRANSITION 31
24'
10a NEW TYPE A CONCRETE ACCESS RAMP
10b NEW TYPE B CONCRETE ACCESS RAMP 4
8'
5'
EXP: EXP:
R2
10c NEW TYPE C CONCRETE ACCESS RAMP
14'
26'
10d NEW TYPE D CONCRETE ACCESS RAMP 30
CERTIFICATE OF AUTHORIZATION NUMBER:
2
25 28 PROFESSIONAL ENGINEERING: 0021272
11 NEW DETECTABLE WARNING SYSTEM 9 LAND SURVEYING: 0021271
7
GEOLOGICAL: 0021659
12 NEW PLAYGROUND AREA, WITH POURED IN PLACE PLAY SURFACING
20
13 NEW 4-FT CHAIN LINK FENCE (CLF) 9 25 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
12
architect, professional engineer, or land surveyor, to alter an item in any
14 NEW YELLOW PAVEMENT MARKINGS (TYP.)
13 way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
15 NEW CROSSWALK the item their seal and notation "altered by" followed by their signature and
14 date of such alteration, and a specific description of the alteration.
16 NEW ADA PARKING SYMBOL (TYP.)
© 2024
2026 LaBella Associates
17 NEW ADA PARKING STRIPING (TYP.)
20
18 NEW DUAL EV CHARGING UNIT (TYP.)
2 5
19 NEW EV PARKING SYMBOL AND SIGNAGE (TYP.)
20 NEW 4-FT CLF SWING GATE
HOME LEASING
28 75 S CLINTON AVE SUITE 700,
21
BANKED PARKING - FUTURE PAVED PARKING (TO BE CONSTRUCTED ROCHESTER, NEW YORK 14604
IF DEMAND INCREASES) 7
18'
22 RECONSTRUCT STONE WALL WITH SALVAGED MATERIALS 7
28.5'
23 NEW DETECTABLE WARNING SYSTEM
1
24 NEW STOP BAR
18' TYP. 30' 18' TYP.
25 NEW LIGHT POLE (TYP.) SEE UTILITY PLAN
26 NEW 6-FT BOARD-ON-BOARD FENCING 19
4
27 NEW 3-FT BOARD-ON-BOARD MANDOOR
28 LANDSCAPED AREA
PROPOSED 4
29
STORMWATER MANAGEMENT PRACTICE - REFER TO 300 SERIES
SHEETS FOR UTILITY DESIGN
3-STORY C0
9' TYP.
4
30 NEW SHED BUILDING 4 C0
31 NEW SNOW STORAGE AREA ± 25,000 SF FOOTPRINT 6' 7
4
WEST SENECA APARTMENTS
28 28
4 2544 CLINTON ST,
1b 2b 1b 1b 2b 1b
9 WEST SENECA, NY 14224
18
25
C0
10c 10c 10c 28
31
6'
C0
2
9 9 28
18' TYP.
7 9' TYP. 7
28 10a
C0 11
S
R2
C0
7
8'
7 9
16 17 16 17
NO: DATE: DESCRIPTION:
15 Revisions
30'
14
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C200 SITE PLAN.dwg
24
R4
0' PROJECT NUMBER:
7 9 3
7 2241067
R1
5 '
R1
5' 7 7
29 DRAWN BY:
EMM / SCB
18' TYP.
28 REVIEWED BY:
28 D
28
D
28 SRV / DPB
30' 30'
10b ISSUED FOR:
5' 21 SITE PLAN APPROVAL
18' TYP.
25 25 25 25
DATE:
4/20/2026
5'
7
R1
R1
DRAWING NAME:
5'
C0 D D
9
1 15
30'
14
24
3 17 16
21'
9
10b 3 SITE PLAN
9
MATCH TO SHEET: C202
8'
R2
18' TYP.
29'
8 9 7 7 7
26 9 28 28
19 10c 10c 2
27 10c
6'
28 DRAWING NUMBER:
C0
5'
4/20/2026 1:17:52 PM
N
1 SITE PLAN 0' 20' 40' 60'
C201 SCALE: 1" = 20'
C201
Page 53 of 1493
Page 54
NOT FOR CONSTRUCTION
3 17 16 9
10b 3
9 21'
MATCH TO SHEET: C201
8'
R2
18' TYP.
29'
8 9 7 7 7
26 9 28 28 300 Pearl Street, Suite 130
19 10c 10c 2
27 10c
Buffalo, NY 14202
6'
28 716-551-6281
C0
5'
18 9 labellapc.com
4 4 1b 2b 1b 25
DS
5'
21
EXP: EXP:
2
CERTIFICATE OF AUTHORIZATION NUMBER:
DS 2 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
5'
25
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
SITE KEY NOTES Sec. 7307, for any person, unless acting under the direction of a licensed
C0 architect, professional engineer, or land surveyor, to alter an item in any
1 NEW STANDARD DUTY ASPHALT PAVEMENT R8 way. If an item bearing the seal of an architect, engineer, or land surveyor
5' 5' is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
2 NEW CONCRETE SIDEWALK
date of such alteration, and a specific description of the alteration.
29
3 NEW CONCRETE DUMPSTER PAD, SEE DETAIL
25 © 2024
2026 LaBella Associates
4 NEW CONCRETE PAD FOR TRASH COLLECTION
25 2
5 NEW CONCRETE GENERATOR/TRANSFORMER PAD, SEE DETAIL
6'
6 NEW PATIO AREA
7 HOME LEASING
18' TYP.
9' TYP. 10d
7 NEW CONCRETE CURB 10' 75 S CLINTON AVE SUITE 700,
5 9
ROCHESTER, NEW YORK 14604
8 NEW FLUSH CONCRETE CURB
10'
2 14
9
9 NEW CURB TRANSITION 9' 14 11
14
24'
D
10a NEW TYPE A CONCRETE ACCESS RAMP 24
31 3 15
10b NEW TYPE B CONCRETE ACCESS RAMP
10c NEW TYPE C CONCRETE ACCESS RAMP 11 1
25
29
10d NEW TYPE D CONCRETE ACCESS RAMP
R8
5'
10d
C0
11 NEW DETECTABLE WARNING SYSTEM
12 NEW PLAYGROUND AREA, WITH POURED IN PLACE PLAY SURFACING 9
13 NEW 4-FT CHAIN LINK FENCE (CLF)
25
14 NEW YELLOW PAVEMENT MARKINGS (TYP.)
15 NEW CROSSWALK
7
WEST SENECA APARTMENTS
16 NEW ADA PARKING SYMBOL (TYP.)
2544 CLINTON ST,
NEW ADA PARKING STRIPING (TYP.) 14 WEST SENECA, NY 14224
17
D
5' 30'
18 NEW DUAL EV CHARGING UNIT (TYP.)
19 NEW EV PARKING SYMBOL AND SIGNAGE (TYP.)
2
20 NEW 4-FT CLF SWING GATE
25
BANKED PARKING - FUTURE PAVED PARKING (TO BE CONSTRUCTED
21
IF DEMAND INCREASES)
9
22 RECONSTRUCT STONE WALL WITH SALVAGED MATERIALS 22
22 NO: DATE: DESCRIPTION:
23 NEW DETECTABLE WARNING SYSTEM Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C200 SITE PLAN.dwg
7 22
24 NEW STOP BAR 22 3 PROJECT NUMBER:
2241067
25 NEW LIGHT POLE (TYP.) SEE UTILITY PLAN 8' 9
R28 R2
' DRAWN BY:
26 NEW 6-FT BOARD-ON-BOARD FENCING 24 EMM / SCB
REVIEWED BY:
27 NEW 3-FT BOARD-ON-BOARD MANDOOR 7 SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
2' 5'
28 LANDSCAPED AREA 10b
STORMWATER MANAGEMENT PRACTICE - REFER TO 300 SERIES DATE:
29
SHEETS FOR UTILITY DESIGN 4/20/2026
30 NEW SHED 9 DRAWING NAME:
31 NEW SNOW STORAGE AREA
SIGN SUMMARY
NUMBER NAME IMAGE SIZE COLORS MUTCD NUMBER QUANTITY
NEW YORK STATE
SITE PLAN
BLACK LETTERING ON
1b 'HANDICAP' 12" x 18" SYMBOL 6
WHITE BACKGROUND
S:\MFriedle\blueicon.jpg
STANDARD
NO
NO PARKING PARKING RED LETTERING ON
2b ANY 12" x 18" R7-1 3
SIGN TIME WHITE BACKGROUND
DRAWING NUMBER:
RED SIGN WITH WHITE
3 STOP SIGN 30" x 30" R1-1 4
LETTERING
4/20/2026 1:18:01 PM
N
1 SITE PLAN 0' 20' 40' 60'
C202
ELECTRIC BLACK LETTERING ON
4 EV PARKING VEHICLE 12" x 18" 8 C202
PARKING
ONLY WHILE
CHARGING
WHITE BACKGROUND SCALE: 1" = 20'
Page 54 of 1493
Page 55
NOT FOR CONSTRUCTION
WEST SENECA FIRE DEPARTMENT LADDER
TRUCK EQUIVALENT VEHICLE PATH 300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
14'
PROPOSED
HYDRANT
EXP: EXP:
HYDRANT COVERAGE
(600-LF MAX)
HYDRANT COVERAGE CERTIFICATE OF AUTHORIZATION NUMBER:
(600-LF MAX) PROFESSIONAL ENGINEERING: 0021272
28' LAND SURVEYING: 0021271
397' GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
PROPOSED architect, professional engineer, or land surveyor, to alter an item in any
3-STORY way. If an item bearing the seal of an architect, engineer, or land surveyor
HYDRANT COVERAGE BUILDING is altered; the altering architect, engineer, or land surveyor shall affix to
(600-LF MAX) the item their seal and notation "altered by" followed by their signature and
± 25,000 SF FOOTPRINT date of such alteration, and a specific description of the alteration.
ACCESSIBLE
ROUTE (TYP.)
© 2024
2026 LaBella Associates
28'
28'
396'
S
RIM=600.15 533'
HOME LEASING
75 S CLINTON AVE SUITE 700,
ACCESSIBLE
WEST SENECA FIRE DEPARTMENT LADDER ROUTE (TYP.)
ROCHESTER, NEW YORK 14604
TRUCK EQUIVALENT VEHICLE PATH
WEST SENECA FIRE DEPARTMENT LADDER
TRUCK EQUIVALENT VEHICLE PATH
HYDRANT COVERAGE
(600-LF MAX)
PROPOSED
HYDRANT
ACCESSIBLE
ROUTE (TYP.)
DS
HYDRANT COVERAGE ACCESSIBLE
(600-LF MAX) ROUTE (TYP.)
276'
276' DS
WEST SENECA APARTMENTS
2544 CLINTON ST,
HYDRANT COVERAGE
(600-LF MAX)
WEST SENECA, NY 14224
15.7'
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C203 CODE COMPLIANCE.dwg
NO: DATE: DESCRIPTION:
WEST SENECA FIRE DEPARTMENT LADDER Revisions
TRUCK EQUIVALENT VEHICLE PATH
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
E-ONE HP95 Mid Mount
47.75
FIRE TRUCK AND SITE
EMERGENCY ACCESS PLAN
7.917 18.417 4.833
20.833
E-ONE HP95 Mid Mount
Overall Length 47.750ft
Overall Width 8.333ft
Overall Body Height 11.000ft
Min Body Ground Clearance 1.393ft
Track Width 8.333ft DRAWING NUMBER:
Lock-to-lock time 6.00s
Max Wheel Angle 45.00°
4/20/2026 1:17:33 PM
N
1 FIRE TRUCK AND SITE EMERGENCY ACCESS PLAN 0' 40' 80' 120'
C203 SCALE: 1" = 40'
C203
Page 55 of 1493
Page 56
NOT FOR CONSTRUCTION
75 LF 12" SICPP
ST
@ 1.00% MIN. 599
600
601
MATCH TO INSET
ST
300 Pearl Street, Suite 130
Buffalo, NY 14202
END SECTION
INV=583.66 716-551-6281
12 LF 12" SICPP @ 1.00%
599
ST
600 labellapc.com
600
599 60
1
C0
598
ST
UD UD UD UD UD UD UD UD UD UD UD UD D
598
600.14 599
600
NEW BIORETENTION 600
AREA #1 (± 350 SF) ST-4.0
599
600
ST
75 LF 12" SICPP 4' DIA. MH
ST-4.1
597
597
598
599
ST
598
RIM=600.25
599
@ 1.00% MIN. 599
600 24"x24" CB N INV=594.36
600
600
RIM=599.00 W INV=594.46
601 N INV=594.58 S INV=595.25
6" SICPP @
ST
1.00% MIN.
ST
EXP: EXP:
ST
N CERTIFICATE OF AUTHORIZATION NUMBER:
2 INSET 60
0 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
C301 SCALE: 1"=20' GEOLOGICAL: 0021659
ST
NEW PRIVATE
FIRE HYDRANT
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
FS
ST-3.4 Sec. 7307, for any person, unless acting under the direction of a licensed
ST
24"x24" CB architect, professional engineer, or land surveyor, to alter an item in any
ST
RIM=599.65 way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
S INV=597.58
the item their seal and notation "altered by" followed by their signature and
FS
date of such alteration, and a specific description of the alteration.
ST
ST
© 2024
2026 LaBella Associates
FS
600
ST
ST
NEW 6" FIRE SERVICE
600
600
(AFTER BACKFLOW
PREVENTOR)
HOME LEASING
598
FS
598
599
599
ST
75 S CLINTON AVE SUITE 700,
600
ST
ROCHESTER, NEW YORK 14604
150 LF 12"
SICPP @ 1.00%
FS
ST
600
ST
595
596
FS
597
ST
598
ST
FS
NEW BACKFLOW PREVENTOR (IN FS
ST
MECHANICAL ROOM) FOR COMBINED
ST
SERVICE. DOMESTIC SERVICE WILL BE
PROPOSED METERED AFTER THE BACKFLOW.
600
600
W
3-STORY C0
ST
BUILDING C0
W
± 25,000 SF FOOTPRINT ST-3.3
ST
24"x24" CB
RIM=599.75
FFE=600.75' 6" SICPP @ N INV=596.08 WEST SENECA APARTMENTS
599
ST
599
1.00% MIN. SW INV=596.08
2544 CLINTON ST,
W
WEST SENECA, NY 14224
595
596
597
598
NEW 6" PVC SDR-21 C0
ST ST ST ST ST ST ST ST ST ST
ST
ST
ST ST ST ST ST ST
SA
SANITARY LATERAL
600
599
600
W
SA
C0
ST
CONNECT INTO
600
600
EXISTING
SAN CO 600
ST
SANITARY MAIN SA
SA
SA TYP.
SA
C0
SA
W
60
SA
0
S SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA C0
SA SA
ST
4' DIA. SAN MH SA SA SA SA SA SA SA
SAN CO 600
RIM=600.15 NEW 6" PVC SDR-21 102 LF 12"
TYP. SAN CO
E INV=589.50 SICPP @ 1.00%
SA
SANITARY LATERAL
ST
TYP. NO: DATE: DESCRIPTION:
W INV=589.40 70 LF 6" SICPP
W
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
@ 1.00% MIN. Revisions
ST
SA
ST-3.0
PROJECT NUMBER:
ST
ST-2.0 4' DIA. MH
2241067
SA
W
4' DIA. MH RIM=599.33
RIM=599.29 N INV=593.25
599
599
ST
W INV=592.12 S INV=592.25 DRAWN BY:
600
E INV=591.25 EMM / SCB
SA
W INV=591.25
ST
30 LF 12" SICPP REVIEWED BY:
SRV / DPB
W
D D
50 5LF
99 12" SICPP @ 5.00%
SA
@ 5.00% 599
ISSUED FOR:
ST
ST-2.2 SITE PLAN APPROVAL
59
24"x24" CB
9
SA
ST-1.1
ST
ST
RIM=598.62
W
4' DIA. MH DATE:
E INV=596.12 599 ST 85 LF 12" SICPP 4/20/2026
RIM=599.08
E INV=591.25 @ 2.00%
SA
SAN CO
ST ST ST ST ST ST ST ST
TYP. W INV=591.25 35 LF 12" SICPP DRAWING NAME:
C0 D D
ST ST ST ST ST ST ST @ 3.00%
W
ST-3.2
SA
120 LF 8" SICPP ST-2.1 ST-3.1
END SECTION ST-1.0 24"x24" CB
@ 1.00% 24"x24" CB 24"x24" CB NEW 6" COMBINED
ADS STORMTECH CHAMBER RIM=598.50
INV=589.75 RIM=598.87 CONTECH CASCADE CS4 WQU RIM=598.89
599 SYSTEM SC-3500 WATER SERVICE
NE INV=595.00
SA
W INV=593.62 RIM=599.00 N INV=593.30
NE INV=593.62 E INV=591.15 (100 CHAMBERS) W INV=593.30 599 W INV=595.00
W
NEW 4" PVC SDR-21 W INV=591.15
NEW PRIVATE
INV=591.25
UTILITY PLAN
SA
SANITARY LATERAL FIRE HYDRANT
MATCH TO SHEET: C302
SA
W
FS
600
DRAWING NUMBER:
SA
W
C0
600
UTILITY PLAN NOTES:
4/20/2026 1:18:02 PM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PLAN 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C301
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C301 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 56 of 1493
Page 57
599
CONTECH CASCADE CS4 WQU RIM=598.89 WATER SERVICE
SYSTEM SC-3500 NE INV=595.00
SA
W INV=593.62 RIM=599.00 N INV=593.30 24
NOT FOR CONSTRUCTION
NE INV=593.62 E INV=591.15 (100 CHAMBERS) W INV=593.30 599 W INV=595.00
W
NEW 4" PVC SDR-21 W INV=591.15 INV=591.25
NEW PRIVATE
SA
SANITARY LATERAL FIRE HYDRANT
MATCH TO SHEET: C301
SA
W
300 Pearl Street, Suite 130
FS
600 Buffalo, NY 14202
716-551-6281
SA
W
C0
SAN CO NEW 6" FIRE SERVICE 600 labellapc.com
FS
TYP. (AFTER BACKFLOW
PREVENTOR)
598
599
598
W
599
DS
599
W
W
EXP: EXP:
W
CERTIFICATE OF AUTHORIZATION NUMBER:
DS PROFESSIONAL ENGINEERING: 0021272
NEW BACKFLOW PREVENTOR LAND SURVEYING: 0021271
(IN MECHANICAL ROOM) FOR GEOLOGICAL: 0021659
W
598
COMBINED SERVICE.
597
DOMESTIC SERVICE WILL BE
597
598
599
METERED AFTER THE It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
BACKFLOW. NEW BIORETENTION Sec. 7307, for any person, unless acting under the direction of a licensed
600
AREA #2 (± 370 SF) architect, professional engineer, or land surveyor, to alter an item in any
W
C0
ST-5.2 UD
way. If an item bearing the seal of an architect, engineer, or land surveyor
24"x24" CB is altered; the altering architect, engineer, or land surveyor shall affix to
599 UD
RIM=597.00 the item their seal and notation "altered by" followed by their signature and
598 UD
W INV=592.58 UD date of such alteration, and a specific description of the alteration.
597
UD
W
596 UD
UD
132 LF 12" UD UD © 2024
2026 LaBella Associates
UD UD UD
60 SICPP @ 0.50% UD
596
W
0
ST
NEW 6" COMBINED 597
W
ST 598
WATER SERVICE
STW
W W W W W W W W W W W W W
HOME LEASING
T
ST 600
W
75 S CLINTON AVE SUITE 700,
ST-5.0 ST
ROCHESTER, NEW YORK 14604
4' DIA. MH
ST
RIM=599.08
S INV=591.30 598
59
ST
9
W
E INV=591.92
W INV=591.20 ST
59 597
T
D
ST 9
ST
ST 596
ST 28 LF 12" SICPP 6
ST 59 7
ST
W
ST @ 1.00% 59 8
ST
ST ST-5.1 59
ST
ST 9
598
ST
ST 220 LF 12" 598 24"x24" CB 59
ST SICPP @ 0.50% 597 RIM=596.00
596 N INV=591.58
W
END SECTION 595
UD UD UD
UD UD UD
INV=589.00 C0
UD UD UD UD UD UD
T
UD
UD
UD
UD
UD
595
W
NEW BIORETENTION
NEW 6" COMBINED
AREA #3 (± 700 SF)
WATER SERVICE
9
59
W
ST-6.0 596
4' DIA. MH 597
WEST SENECA APARTMENTS
T
RIM=597.50 598
E INV=590.10 2544 CLINTON ST,
598
599
597
W
596
595
595
W INV=590.00
596
597
WEST SENECA, NY 14224
598
599
ST ST ST ST ST D ST ST ST ST ST ST ST ST ST ST
ST ST ST ST ST
175 LF 12" 175 LF 12"
W
END SECTION ST-6.1
T
SICPP @ 1.00% SICPP @ 1.00%
INV=5#.## 36"x36" CB
RIM=594.35
598
W INV=591.85
W
T
NO: DATE: DESCRIPTION:
CONNECT TO EXISTING 6"
W
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
WATERMAIN WITH TS&V Revisions
PROJECT NUMBER:
2241067
W
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
UTILITY PLAN
DRAWING NUMBER:
UTILITY PLAN NOTES:
4/20/2026 1:17:32 PM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PLAN 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C302
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C302 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 57 of 1493
Page 58
NOT FOR CONSTRUCTION
599
600
601
601.17
601.62
300 Pearl Street, Suite 130
Buffalo, NY 14202
594.92
716-551-6281
601.26
599
600 600.87
labellapc.com
600
599 60
1
C0
598
UD UD UD UD UD UD UD UD UD UD UD UD D
598
599
600
600 600.54 600.90
INSTALL AND MAINTAIN
599
600
TEMPORARY SILT SOCK
597
597
598
599
600.10
598
599
600.18
600
600
600.54 600.54 600.72
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
60
0 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
600.39 TC 600.84 TC
599.89 BC 600.34 BC It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2024
2026 LaBella Associates
600
600
600
HOME LEASING
598
598
599
599
75 S CLINTON AVE SUITE 700,
600
ROCHESTER, NEW YORK 14604
600
595 600.78 TC
596 600.28 BC 601.23 TC
597 600.73 BC
598
PROPOSED
600
600
3-STORY C0
BUILDING C0
± 25,000 SF FOOTPRINT
FFE=600.75' WEST SENECA APARTMENTS
599
599
600.92 TC
600.42 BC
2544 CLINTON ST,
600.91 TC
WEST SENECA, NY 14224
595
600.41 BC
596
597
598
600.14
C0
600
599
600
C0
600.38 TC 600.67 TC 600.68 TC 600.79 TC
600.11 600 600.50 TC
599.09 HP
600
599.88 BC 600.17 BC 600.18 BC 600.29 BC 600.00 BC
600 600.63 TC 600.63 TC
C0
600.27 600.13 BC 600.13 BC
60
600.63 TC
0
S
C0
600.13 BC
600
RIM=600.15
600.04 599.87
NO: DATE: DESCRIPTION:
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C400 GRADING PLAN.dwg
Revisions
599.92 TC 600.13 TC 599.91 TC 599.59 TC PROJECT NUMBER:
599.42 BC 599.63 BC 599.41 BC 599.09 BC 2241067
599
599
599.49 TC DRAWN BY:
600
598.99 BC EMM / SCB
REVIEWED BY:
599 D D SRV / DPB
599
ISSUED FOR:
SITE PLAN APPROVAL
59
9
DATE:
599 598.89 4/20/2026
DRAWING NAME:
599.34 TC C0 D D 599.72 TC 599.32 TC 599.05 TC
598.84 BC 599.22 BC 598.82 BC 598.55 BC
599.16
599.48 TC 599
598.98 BC
599.48 599.62
599 GRADING, EROSION, AND
SEDIMENT CONTROL PLAN
MATCH TO SHEET: C402 599.84
599.80
600.27 TC 600.37 TC 600.45 TC 600.44 TC 600.11 TC 600.02 TC 599.80 TC
599.98 TC 599.61 BC 599.52 BC 599.30 BC
599.48 BC 599.77 BC 599.87 BC 599.95 BC 599.94 BC
600
600.17 DRAWING NUMBER:
599.19 599.46
C0
600 599.87
4/20/2026 1:17:56 PM
N
1
GRADING, EROSION, AND SEDIMENT CONTROL PLAN 0' 20' 40' 60'
C401 SCALE: 1" = 20'
C401
Page 58 of 1493
Page 59
599.48 TC 599
598.98 BC 24
NOT FOR CONSTRUCTION
599
599.48 599.62
MATCH TO SHEET: C401
599.80 599.84
600.27 TC 600.37 TC 600.45 TC 600.44 TC 600.11 TC 600.02 TC 599.80 TC
599.98 TC 599.61 BC 599.52 BC 599.30 BC
599.77 BC 599.87 BC 599.95 BC 599.94 BC
599.48 BC 300 Pearl Street, Suite 130
FS
600 Buffalo, NY 14202
600.17 716-551-6281
599.19 599.46
C0
600.50 600.50 600.37 600 599.87 labellapc.com
600.20
FS
598.74
598
599
598
600.45
599
DS
599
599.24
598.95
600.45
598.50
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
DS PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
598
600.54
597
597
600.22
598
599
600.36 600.61 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
600.43 Sec. 7307, for any person, unless acting under the direction of a licensed
600
598.09
C0 598.54 architect, professional engineer, or land surveyor, to alter an item in any
INSTALL AND MAINTAIN way. If an item bearing the seal of an architect, engineer, or land surveyor
TEMPORARY SILT SOCK is altered; the altering architect, engineer, or land surveyor shall affix to
599 the item their seal and notation "altered by" followed by their signature and
598
date of such alteration, and a specific description of the alteration.
597
596
600.50 © 2024
2026 LaBella Associates
60 600.29 600.30 596
0 600.11 600.04
600.02
599.53 597
598
600.17 TC
599.67 BC 600
600.18
598.01 HOME LEASING
599.50 TC 75 S CLINTON AVE SUITE 700,
599.00 BC
599.94 TC 599.88 ROCHESTER, NEW YORK 14604
599.44 BC
INSTALL AND MAINTAIN
598
59
TEMPORARY CONCRETE 600.04 TC 598.46
9
600.03
WASHOUT 599.54 BC
599.54
D 59
9 597 599.84
599.04 596
599.99 6
598.32 59 7
599.17 59 8
59
9
598
598 59
597
596
595
C0 599.46 TC
598.96 BC
599.46
595
599.34 TC
598.84 BC
INSTALL AND MAINTAIN
TEMPORARY SILT SOCK 9
59
596
597
598
WEST SENECA APARTMENTS
2544 CLINTON ST,
598
599
597
596
595
595
596
597
WEST SENECA, NY 14224
598
599
599.70 TC
D 599.20 BC
INSTALL AND MAINTAIN TEMPORARY
CONSTRUCTION ENTRANCE
599.65
598
600.11 TC NO: DATE: DESCRIPTION:
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C400 GRADING PLAN.dwg
599.61 BC
Revisions
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
GRADING, EROSION, AND
SEDIMENT CONTROL PLAN
DRAWING NUMBER:
4/20/2026 1:17:35 PM
N
1
GRADING, EROSION, AND SEDIMENT CONTROL PLAN 0' 20' 40' 60'
C402 SCALE: 1" = 20'
C402
Page 59 of 1493
Page 60
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
STORM SEWER GRATE way. If an item bearing the seal of an architect, engineer, or land surveyor
12 is altered; the altering architect, engineer, or land surveyor shall affix to
"
OV MIN the item their seal and notation "altered by" followed by their signature and
ER IM 2" X 2" WOODEN SPIKES
LA UM date of such alteration, and a specific description of the alteration.
P PLACED 10' O.C.
BLOWN/PLACED FILTER MEDIA COMPOST FILTER SOCK
© 2024
2026 LaBella Associates
DISTURBED AREA UNDISTURBED AREA
MIN.
12"
2
1 SLOPE OR LESS
EXISTING CONTOURS
SECTION VIEW HOME LEASING
75 S CLINTON AVE SUITE 700,
FILTER SOCK FILLED ROCHESTER, NEW YORK 14604
8'
WITH CRUSHED STONE
DISTURBED AREA
FLO
W
FLO
W
SECURE FILTER SOCK
AS RECOMMENDED MIN. SLOPE MIN. SLOPE
STORM SEWER GRATE BY MANUFACTURER SILT FENCE
FLOW FLOW NOTES:
2" X 2" WOODEN STAKES
1. AREA CHOSEN FOR STOCKPILING OPERATIONS SHALL BE DRY AND STABLE.
PLACED 10' O.C.
2. MAXIMUM SLOPE OF STOCKPILE SHALL BE 1V:2H.
UNDISTURBED AREA
3. UPON COMPLETION OF SOIL STOCKPILING, EACH PILE SHALL BE SURROUNDED WITH
COMPOST FILTER SOCK
SILT FENCING, THEN STABILIZED WITH VEGETATION OR COVERED.
PLAN VIEW 4. SEE SPECIFICATIONS AND DETAIL FOR INSTALLATION OF SILT FENCE.
6 INLET PROTECTION IN PAVEMENT 5 COMPOST FILTER SOCK 4 TEMPORARY SOIL STOCKPILE
C501 N.T.S. C501 NYS DEC DETAIL: COMPOST FILTER SOCK C501 N.T.S.
WOVEN WIRE FENCE (MIN. 14 GAUGE W/
MAX. 6" MESH SPACING WITH FILTER CLOTH 36" MIN. FENCE
POSTS, DRIVEN MIN.
WEST SENECA APARTMENTS
10' MAX. C. TO C.
16" INTO GROUND 2544 CLINTON ST,
50' MIN. MOUNTABLE
WEST SENECA, NY 14224
BERM (OPTIONAL)
MIN.
6"
EXISTING
PAVEMENT
FILTER = 18"
3' 5:1
HEIGHT OF
MIN.
10' TYP. 2"
STAKE (TYP.)
EXISTING GROUND FILTER CLOTH
4"
MIN.
PROFILE VIEW
6"
1/8" DIA. STEEL WIRE
W
FLO
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
50' MIN. STAPLE DETAIL W
FLO
B B NO: DATE: DESCRIPTION:
10' MIN.
10' TYP.
PERSPECTIVE VIEW 1 41" SQUARE HARDWOOD Revisions
EXISTING GROUND
# STAPLES (2 PER BALE) BINDING WIRE 36" MIN. FENCE POST
C### PROJECT NUMBER:
12' MIN.
12' MIN.
EXISTING STRAW BALE (TYP.)
2241067
WOVEN WIRE FENCE (MIN. 14 GAUGE W/
3' TYP.
PAVEMENT MAX. 6" MESH SPACING WITH FILTER CLOTH
IMPERMEABLE SHEETING DRAWN BY:
20" MIN.
EMM / SCB
REVIEWED BY:
SYMBOL IMPERMEABLE SHEETING STRAW BALE (TYP.) WOOD OR METAL STAKES (2 PER BALE) UNDISTURBED SRV / DPB
FLOW GROUND
PLAN SECTION B-B ISSUED FOR:
PLAN VIEW NOTE: SITE PLAN APPROVAL
EMBED FILTER CLOTH A MIN. OF 6" IN GROUND
1. CAN BE TWO STACKED BALES OR PARTIALLY EXCAVATED TO REACH 3 FT DEPTH DATE:
CONSTRUCTION SPECIFICATIONS: 4" MIN. 4/20/2026
16" MIN.
1. STONE SIZE - USE 1-4 INCH STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.
CONSTRUCTION SPECIFICATIONS SYMBOL
DRAWING NAME:
2. LENGTH - NOT LESS THAN 50 FEET. COMPACTED SOIL
1. LOCATE WASHOUT STRUCTURE A MINIMUM OF 100 FEET AWAY FROM OPEN CHANNELS, STORM DRAIN INLETS, SENSITIVE AREAS, WETLANDS,
3. THICKNESS - NOT LESS THAN SIX (6) INCHES. BUFFERS AND WATER COURSES AND AWAY FROM CONSTRUCTION TRAFFIC.
4. WIDTH - TWENTY-FOUR (24) FOOT IF SINGLE ENTRANCE TO SITE. 2. SIZE WASHOUT STRUCTURE FOR VOLUME NECESSARY TO CONTAIN WASH WATER AND SOLIDS AND MAINTAIN AT LEAST 4 INCHES OF FREEBOARD.
5. GEOTEXTILE - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE.
6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ACCESS SHALL BE PIPED
TYPICAL DIMENSIONS ARE 10 FEET X 10 FEET X 3 FEET DEEP.
NOTES: SECTION VIEW
3. PREPARE SOIL BASE FREE OF ROCKS OR OTHER DEBRIS THAT MAY CAUSE TEARS OR HOLES IN THE LINER. FOR LINER, USE 10 MIL OR THICKER UV
BENEATH THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. RESISTANT, IMPERMEABLE SHEETING, FREE OF HOLES AND TEARS OR OTHER DEFECTS THAT COMPROMISE IMPERMEABILITY OF THE MATERIAL.
7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR
FLOWING OF SEDIMENT ONTO PUBLIC RIGHT OF WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED
4.
5.
PROVIDE A SIGN FOR THE WASHOUT IN CLOSE PROXIMITY TO THE FACILITY.
KEEP CONCRETE WASHOUT STRUCTURE WATER TIGHT. REPLACE IMPERMEABLE LINER IF DAMAGED (E.G., RIPPED OR PUNCTURED). EMPTY OR
1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. POSTS SHALL BE STEEL
EITHER "T" OR "U" TYPE OR HARDWOOD. CONSTRUCTION DETAILS
ONTO PUBLIC RIGHTS OF WAY MUST BE REMOVED IMMEDIATELY. REPLACE WASHOUT STRUCTURE THAT IS 75 PERCENT FULL, AND DISPOSE OF ACCUMULATED MATERIAL PROPERLY. DO NOT REUSE PLASTIC LINER. 2. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION.
8. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN WET-VACUUM STORED LIQUIDS THAT HAVE NOT EVAPORATED AND DISPOSE OF IN AN APPROVED MANNER. PRIOR TO FORECASTED RAINSTORMS, FENCE SHALL BE WOVEN WIRE, 6" MAXIMUM MESH OPENING.
APPROVED SEDIMENT TRAPPING DEVICE. REMOVE LIQUIDS OR COVER STRUCTURE TO PREVENT OVERFLOWS. REMOVE HARDENED SOLIDS, WHOLE OR BROKEN UP, FOR DISPOSAL OR 3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER-LAPPED BY SIX INCHES AND FOLDED.
9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN EVENT. RECYCLING. MAINTAIN RUNOFF DIVERSION AROUND EXCAVATED WASHOUT STRUCTURE UNTIL STRUCTURE IS REMOVED. FILTER CLOTH SHALL BE EITHER FILTER X, MIRAFI 100X, STABLINKA 140N, OR APPROVED EQUAL.
4. PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVED EQUAL.
5. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE.
3 STABILIZED CONSTRUCTION ENTRANCE 2 CONCRETE WASHOUT AREA WITH STRAW BALES 1 SILT FENCE DRAWING NUMBER:
C501 N.YS DEC DETAIL: STABILIZED CONSTRUCTION ACCESS C501 N.T.S. C501 NYS DEC DETAIL: SILT FENCE
4/20/2026 1:17:16 PM
C501
Page 60 of 1493
Page 61
NOT FOR CONSTRUCTION
SPACES SHOULD BE
EQUAL TO LINE WIDTH
NY R7-8 MUTCD R7-1 NY R7-8
300 Pearl Street, Suite 130
12"
1 MATCH ENDS OF TRANSITION
2" PREMOULDED Buffalo, NY 14202
CURB TO ADJACENT CURBS (OR
8"
BITUMINOUS CURB
UNLESS OTHERWISE
POST MOUNT SIGN OR
716-551-6281
NOTED ON PLANS
FLUSH WITH GRADE - SEE PLANS)
JOINT FILLER EXPANSION CAP
12
2" SIGN MOUNTED ON
"
8"
BOLLARD. SEE SITE
TOP OF CURB labellapc.com
7'-0"
TYP.
45°
PLAN (TYP.)
FLUSH CURB
4" WIDE
SEE PLANS
6"
PARKING
1'-4"
SPACE
PAVEMENT
12"
MARKING
1'-0"
1" 4'-0"
3'-0" MIN. NOTES:
#4 1'-6" LONG THIS PART OF DOWEL TO 6'-0" MAX.
4'-0"
BE PAINTED AND OILED 1. ALL STRIPING SHALL BE WHITE
ELEVATION AT EXPANSION JOINT TERMINAL/TRANSITION CURB 11 CROSSWALK
8' TYP. 8' TYP.
C502 N.T.S.
PAVEMENT SYMBOL PER ADA
WHITE ON BLUE BACKGROUND EXP: EXP:
NOTE: ALL PARKING STRIPING TO BE YELLOW 3
TOP OF CURB 8" CAP SCREW
#4 1'-6" LONG 3
8" FLAT WASHER
A
12 ADA PARKING SPACE STRIPING (ZINC PLATED)
CERTIFICATE OF AUTHORIZATION NUMBER:
SIGN FACE
C502 NEW SIGN PANEL (16 PROFESSIONAL ENGINEERING: 0021272
EXPANSION JOINT MATERIAL N.T.S. 2" x 2" SQ.
ROUNDED GA. GALV. STEEL) LAND SURVEYING: 0021271
AT CONCRETE SIDEWALKS
D
GEOLOGICAL: 0021659
D/2
R=1" 3
8" HEX NUT
CONCRETE SIDEWALK 8" (ZINC PLATED)
2"
A A
1
OR TOPSOIL
SECTION A-A
A CONSTRUCTION JOINT TOP OF PAVEMENT It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
TYP.
SEE PAVEMENT SECTION
6"
architect, professional engineer, or land surveyor, to alter an item in any
ELEVATION AT 2" x 2" SQUARE UNISTRUT POST way. If an item bearing the seal of an architect, engineer, or land surveyor
(GALV. STEEL) VARIABLE
1'-6"
CONSTRUCTION JOINT is altered; the altering architect, engineer, or land surveyor shall affix to
LENGTH (PERFORATED) the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SELECT DOMED CONCRETE FILL NEW SIGN PANEL (16 DOMED CONCRETE FILL
6" BACKFILL GA. GALV. STEEL)
7'-0" (MAX.)
5'-0" (MIN.)
MATERIAL CONTINUOUS BED © 2024
2026 LaBella Associates
6" O.D. STEEL PIPE WITH PLASTIC
SUBBASE COURSE 6" O.D. STEEL PIPE WITH PLASTIC
1'-9" (MIN.)
SLEEVE (YELLOW) A A SLEEVE (YELLOW)
MIN.
6"
DOWEL
3'-6"
D
3'-6"
DOMED IN GRASS AREA 2 14" x 2 1 4" SQUARE UNISTRUT
D/2
6" 6" FLUSH IN CONCRETE
OR PAVED AREA 2" x 2" SQUARE UNISTRUT POST POST BASE (GALVANIZED STEEL)
2"
3"
VERTICAL
(GALV. STEEL) VARIABLE
LENGTH (PERFORATED)
3
8" CAP SCREW
DOMED IN GRASS AREA
HOME LEASING
3
8" FLAT WASHER
75 S CLINTON AVE SUITE 700,
SECTION A-A
7'-0" (MAXIMUM)
5'-0" (MINIMUM)
(ZINC PLATED) ROCHESTER, NEW YORK 14604
SEE ASPHALT
TYPICAL SIGN FACE
PAVEMENT
TYPICAL
DETAILS
GRASS
PAVED AREA 2" x 2" SQ.
NOTES: AREA
4000 PSI CONCRETE 2 14" x 2 14" SQUARE UNISTRUT
3'-6"
3
8" HEX NUT (ZINC PLATED)
3'-6"
1. SLOPE TOP OF CURB 1/4" PER FOOT TOWARD PAVEMENT. POST BASE (GALVANIZED STEEL)
2. CONTRACTION JOINTS SHALL BE FORMED OR SAWCUT EVERY 10 FEET TO DEPTHS SLIGHTLY BELOW THE PAVEMENT SURFACE. UNDISTURBED EARTH SECTION A-A
4" TO 6"
3. EXPANSION JOINTS 1/2" IN WIDTH SHALL BE FORMED WITH A PREMOULDED BITUMINOUS JOINT FILLER EVERY 40 FEET. OR 18" SONOTUBE 5,000 PSI CONCRETE
3" x 3 8" BOLT (ZINC PLATED)
4. EXPANSIONS JOINTS AND FORMED CONTRACTION JOINTS ARE TO BE EDGED WITH CONCRETE FINISHING TOOLS. SUBBASE COURSE AND 3 8" 0 NUT (ZINC PLATED) UNDISTURBED EARTH
5. CONCRETE SEALING AGENT SHALL BE APPLIED THE SAME DAY THAT CURBS ARE CONSTRUCTED. NOTES:
6"
OR 18" SONOTUBE
4'-0"
6"
6. CONCRETE CURBING WITHIN R.O.W. SHALL CONFORM WITH NYSS M609-2R1.
7. CURB THICKNESS T IS TO BE 5" OR AS INDICATED ON THE DRAWINGS. 1. MAINTAIN TWO FEET OF CLEARANCE FROM SUBBASE COURSE
8" MIN.
8" MIN.
8. PROVIDE 0" CURB REVEAL FOR HEADER CURB CURB AT SIDEWALK RAMPS AND 1" CURB REVEAL FOR HEADER CURB AT DRIVEWAYS. FACE OF CURB TO ANY PART OF SIGN, AS
9. ALL CURB, EXCEPT HEADER CURB USED FOR SIDEWALK ACCESS RAMPS, IS TO HAVE THE 1" RADIUS. NOTE: APPLICABLE.
10. GRADED STONE BACKING IS TO BE PLACED WHEN SIDEWALK DOES NOT ABUT CURB. 2. SEE PLANS FOR SIGN AND POST LOCATIONS. NOTES:
1. FINAL LOCATION OF BOLLARDS SHALL BE APPROVED
11. USE 5000 PSI CONCRETE FOR CONVENTIONALLY FORMED CURB. AND 5000 PSI CONCRETE FOR MACHINE FORMED CURB. BY THE OWNER OR ARCHITECT/ENGINEER.
1. FINAL LOCATION OF BOLLARDS SHALL BE APPROVED BY THE OWNER OR ARCHITECT/ENGINEER.
10 CONCRETE CURB 9 BOLLARD 8 POST MOUNT SIGN 7 BOLLARD MOUNTED SIGN
C502 N.T.S. C502 N.T.S. C502 N.T.S. C502 N.T.S.
INITIAL FULL DEPTH SAW CUT
FINAL SAW CUT. MATCH EXISTING SEE NOTE 2
PAVEMENT. CAP SEAM WITH
BITUMINOUS SEALER. (SEE NOTE 2)
TOP COURSE
BINDER COURSE
WEST SENECA APARTMENTS
SEE NOTE 2 18" SUBBASE COURSE 2544 CLINTON ST,
WEST SENECA, NY 14224
EXISTING
ASPHALT PAVEMENT NOTES: PAVEMENT
1. HMA ITEMS ARE BASED ON PG 64-22 BINDER, ESALs LESS THAN 30,000,000. TACK COAT IS REQUIRED BETWEEN ALL LIFTS OF ASPHALT. USE OF POLYPHOSPHORIC ACID (PPA) TO MODIFY THE BINDER
6"x6" WELDED WIRE EXISTING
PROPERTIES IS PROHIBITED. THIS PROHIBITION ALSO APPLIES TO THE USE OF PPA AS A CROSS-LINKING AGENT FOR POLYMER MODIFICATION.
TOP AND BOTTOM SUBBASE
8" THICK
2. BUTT JOINTS, CREATED BY A FULL-DEPTH SAWCUT, SHALL BE USED BETWEEN NEW AND EXISTING PAVEMENTS. THE ASPHALT TOP COURSE SHALL BE LAID SUCH THAT IT UNIFORMLY OVERLAPS THE 4,500 PSI CONCRETE
ADJACENT COLD MAT BY 2"-3". THE THICKNESS OF THE OVERLAP MATERIAL SHALL BE 1/4 THE COMPACTED THICKNESS OF THE COURSE, SO AS TO RESULT IN A SMOOTH AND WELL-COMPACTED JOINT
AFTER ROLLING. BROADCASTING OF THE OVERLAP MATERIAL ONTO THE LANE IS NOT ALLOWED. IF THE OVERLAP IS EXCESSIVE, THE EXCESS MATERIAL SHALL BE TRIMMED OFF SO THAT THE MATERIAL x x x x x x x
ALONG THE JOINT IS UNIFORM. THE COARSE PARTICLES OF AGGREGATE IN THE OVERLAP MATERIAL SHALL BE REMOVED AND WASTED IF DEEMED NECESSARY BY THE INSPECTOR.
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
x x x x x x GEOTEXTILE STABILIZATION
3. DESIGN PGB CONTENT SELECTION: THE PRODUCER SELECTS THE DESIGN PGB CONTENT THAT RESULTS IN A COMPACTED DENSITY OF 96.5% Gmm AT THE DESIGN NUMBER OF GYRATIONS (Ndesign). 12" COMPACTED FABRIC (SEE ASPHALT
1 21" 9.5 F2 TOP COURSE HMA UNDER NO CIRCUMSTANCES SHALL THE PERFORMANCE GRADED BINDER CONTENT IN THE HMA MIXTURE BE LESS THAN 5.8% FOR A 9.5 DESIGN, 5.2% FOR A 12.5 DESIGN, 4.5% FOR A 19.0 DESIGN, 4.2% SUBBASE MATERIAL NO: DATE: DESCRIPTION:
PAVEMENT DETAILS)
80 SERIES COMPACTION FOR A 25.0 DESIGN, OR 3.7% FOR A 37.5 DESIGN. ALL VOLUMETRIC AND MECHANICAL PROPERTIES ARE CHECKED AT THIS PGB CONTENT TO ENSURE THAT ALL REQUIREMENTS ARE MET. NOTES: Revisions
NYSDOT ITEM NO. 402.098202 WELL COMPACTED SUBGRADE
2-1/2" 19.0 F9 BINDER COURSE HMA 4. PERFORM ALL WARRANTY WORK IN ACCORDANCE WITH MATERIALS PROCEDURE (MP) 402-01, WARRANTY REQUIREMENTS FOR HOT MIX ASPHALT (HMA) TOP COURSE. 1. VERTICALLY SAW CUT ALL ASPHALT FULL DEPTH.
80 SERIES COMPACTION 2. BLOW CLEAN AND APPLY TACK COAT 0.050 GAL/SY AT ALL ASPHALT TO ASPHALT SURFACES. PROJECT NUMBER:
COMPACTED
NYSDOT ITEM NO. 402.198902 5. AS PER STANDARD SPECIFICATION SECTION 401-4.01 CERTIFIED PRODUCTION, PRODUCTION LESS THAN 500 TONS, AND HIGHWAY PERMIT PRODUCTION, PRODUCTION MEETING THE SPECIFICATION 3. REFER TO STANDARD DUTY PAVEMENT SECTION DETAIL FOR COURSE THICKNESS. 2241067
SUBGRADE
REQUIREMENTS WILL BE ASSIGNED A QAF OF 1.00. PRODUCTION FAILING TO MEET THE SPECIFICATION REQUIREMENTS WILL BE SUBJECT TO EVALUATION ACCORDING TO SECTION 401-4.03, EVALUATION
6" 37.5 F9 BASE COURSE HMA OF SUBLOTS REPRESENTED BY 0.85 QAF.
6 CONCRETE PAD 5 STANDARD DUTY PAVEMENT JOINT DRAWN BY:
80 SERIES COMPACTION EMM / SCB
NYSDOT ITEM NO. 402.378902 1 1/2" ASPHALT CONCRETE TOP COURSE C502 N.T.S. C502 N.T.S. REVIEWED BY:
2 1/2" ASPHALT CONCRETE BINDER COURSE SRV / DPB
12" SUBBASE COURSE, TYPE 2 12" STONE SUBBASE COURSE
(INSTALLED IN TWO 6" LIFTS) BEVEL EDGE ISSUED FOR:
NYSDOT ITEM NO. 304.12 ASPHALT EMULSION TACK 6" SITE PLAN APPROVAL
COAT NYSDOT ITEM
407.01 - TACK COAT FINISH GRADE DATE:
4/20/2026
MATCH ORIGINAL RESTORE LAWN DISTURBED BY CONSTRUCTION MATCH ENDS OF TRANSITION
CURB
SHOULDER SLOPE AND PROVIDE NEW 6" MINIMUM DEPTH CURB TO ADJACENT CURBS (OR DRAWING NAME:
MECHANICALLY SCREENED TOPSOIL CURB CURB TERMINAL FLUSH WITH GRADE - SEE PLANS)
EXTEND BASE COURSE AT FREE EDGE
FLUSH CURB
6"
1'-6" 6"
COMPACTED SUBGRADE
1'-6"
FINISHED GRADE FINISHED GRADE
GEOTEXTILE STABILIZATION FABRIC,
TENSAR T-130 OR APPROVED EQUAL CONSTRUCTION DETAILS
1'-0"
NOTES: RESTORE LAWN DISTURBED BY
6'-0" UNLESS
6'-0" CONSTRUCTION AND PROVIDE NEW
COMPACTED 1. PROVIDE ADDITIONAL SUBBASE MATERIAL WHERE FILL IS REQUIRED TO OBTAIN PROPER 6" MINIMUM DEPTH MECHANICALLY OTHERWISE NOTED
SUBGRADE SUBGRADE ELEVATION, OR TO REPLACE UNSUITABLE SUBGRADE MATERIAL. SCREENED TOPSOIL
4 PAVEMENT SECTION WITHIN R.O.W. 3 ASPHALT PAVEMENT SECTION 2 CURB TERMINAL 1 CURB TRANSITION
DRAWING NUMBER:
C502 N.T.S. C502 N.T.S. C502 N.T.S. C502 N.T.S.
4/20/2026 1:17:48 PM
C502
Page 61 of 1493
Page 62
NOT FOR CONSTRUCTION
SIDEWALK SIDEWALK GR B
AS
S
4'-0
GR SE " MIN
AD
E BR
EP
LA
300 Pearl Street, Suite 130
A EA N
KB
AC
Buffalo, NY 14202
KO A
FC A 716-551-6281
UR
B >5 7.5% MAX SLOPE 4'-0" MIN.
'
3'-0" SEE PLAN 3'-0"
labellapc.com
SEE CONCRETE SIDEWALK DETAIL
SEE CONCRETE SIDEWALK DETAIL
B
DETECTABLE
0" TOP OF PAVEMENT
WARNING SYSTEM 2'- GR
AS
S SECTION A-A
MEET FLUSH WITH
A TOP OF PAVEMENT 25% MAX SLOPE
MEET FLUSH WITH MEET FLUSH WITH TOP OF PAVEMENT 3'-0
TOP OF PAVEMENT "
DETECTABLE WARNING SYSTEM A
0" CURB REVEAL VARIES
DETECTABLE WARNING SYSTEM
ACCESS RAMP AT CORNER - ISOMETRIC OPTION 1 ACCESS RAMP - ISOMETRIC OPTION 3 A PAVEMENT
7.5%
CURB
TOP OF CURB 7.5% MAX SLOPE
SIDEWALK TYPE "B" RAMP ISOMETRIC
SIDEWALK
SECTION B-B EXP: EXP:
GR
NOTES:
AD TOP OF PAVEMENT
E BR TRANSITION FLUSH WITH PAVEMENT CERTIFICATE OF AUTHORIZATION NUMBER:
A EA 1. 7.5% IS MAXIMUM SLOPE OF ACCESS RAMP.
KB PROFESSIONAL ENGINEERING: 0021272
AC 2. SURFACE OF ACCESS RAMP IS TO BE STABLE, FIRM AND SLIP-RESISTANT. TEXTURE SURFACE WITH
KO A LAND SURVEYING: 0021271
FC
UR SECTION A-A COARSE BROOM RUNNING TRANSVERSE TO SLOPE OF ACCESS RAMP.
GEOLOGICAL: 0021659
B< 3. ENTIRE AREA OF ACCESS RAMP AND LANDING PAD IS TO BE 7 INCH THICK CONCRETE.
5'
SEE CONCRETE SIDEWALK DETAIL
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
SEE CONCRETE SIDEWALK DETAIL
7 SIDEWALK RAMP TYPE B Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
C503 N.T.S. way. If an item bearing the seal of an architect, engineer, or land surveyor
MEET FLUSH WITH is altered; the altering architect, engineer, or land surveyor shall affix to
A TOP OF PAVEMENT MEET FLUSH WITH the item their seal and notation "altered by" followed by their signature and
TOP OF PAVEMENT date of such alteration, and a specific description of the alteration.
DETECTABLE WARNING SYSTEM A
B
DETECTABLE WARNING SYSTEM
ACCESS RAMP AT CORNER - ISOMETRIC OPTION 2 ACCESS RAMP - ISOMETRIC OPTION 4 © 2024
2026 LaBella Associates
8 SIDEWALK RAMP TYPE D 3'-0"
MINIM
A UM TOP OF PAVEMENT TOP OF CURB
C503 N.T.S. WIDTH VARIES, SEE PLANS SIDEW 12 12
ALK 1 1
B
8"
DETECTABLE WARNING 6'-0"
3'-0" MIN.
SEE PLAN 6'-0"
HOME LEASING
4,500 PSI CONCRETE TOOLED NOTCH 38" x 83" VERTICAL CURB 75 S CLINTON AVE SUITE 700,
SYSTEM PER DETAIL 2'-0"
" MEET FLUSH WITH SECTION A-A ROCHESTER, NEW YORK 14604
R1
SLOPE AS SHOWN ON PLANS 6" UNLESS OTHERWISE SHOWN ON PLANS TOP OF PAVEMENT
A
TOP OF SIDEWALK RAMP TYPE A ISOMETRIC
5"
SLOPE PAVEMENT GRASS
VARIES
TOP OF CURB SIDEWALK
12 12
6"
SEE PAVEMENT 1 1 3'-0
"M
10"
SECTIONS 12 IN.
(SE
6'-0" HEADER EP
1 LA
N)
SUBBASE MATERIAL TRANSITION CURB TRANISITON
A
TOP OF PAVEMENT
6"
0"
2'-
1 12
2" 2" 8" VIEW A-A MEET FLUSH WITH
NOTES: 1:50
TOP OF PAVEMENT
8" 0" CURB REVEAL DETECTABLE WARNING SYSTEM
12
1. 1:12 IS MAXIMUM SLOPE OF ACCESS RAMP AND MAX
1 SIDEWALK
SIDE FLARE IN PAVED AREA.
6 CONCRETE SIDEWALK AND INTEGRAL VERTICAL CURB SECTION 2. SURFACE OF ACCESS RAMP IS TO BE STABLE,
A
FIRM AND SLIP-RESISTANT. TEXTURE SURFACE
C503 N.T.S. ACCESS LANDING PAD
WITH COARSE BROOM RUNNING TRANSVERSE
RAMP 3'-0" MINIMUM
TO SLOPE OF ACCESS RAMP.
3. ENTIRE AREA OF ACCESS RAMP AND LANDING
ACCESS RAMP - TYPE C ISOMETRIC
PAD IS TO BE 7 INCH THICK CONCRETE.
NOTES:
SECTION B-B
1. 1:12 IS MAXIMUM SLOPE OF ACCESS RAMP. WEST SENECA APARTMENTS
5 SIDEWALK RAMP TYPE A 2. SURFACE OF ACCESS RAMP IS TO BE STABLE, FIRM AND SLIP-RESISTANT. TEXTURE SURFACE
WITH COARSE BROOM RUNNING TRANSVERSE TO SLOPE OF ACCESS RAMP.
2544 CLINTON ST,
4" WIDE 3. ENTIRE AREA OF ACCESS RAMP AND LANDING PAD IS TO BE 7 INCH THICK CONCRETE. WEST SENECA, NY 14224
C503 N.T.S.
PARKING
SPACE
50%-60% OF 4 SIDEWALK RAMP TYPE C
PAVEMENT
MARKING BASE DIAMETER C503 N.T.S.
4'-0"
2'-0"
4'-0"
0.20"
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
5)
TE
E NO
0.90"-1.41" S (SE NO: DATE: DESCRIPTION:
1 1 SAW-CUT, OR WET CUT CONCRETE
ELECTRIC CHARGING STATION RIE 2" WIDE PREMOULDED BITUMINOUS 2" WIDE PREMOULDED BITUMINOUS
PAVEMENT SYMBOL VA JOINT FILLER WITH 5 8" DEEP X 12" WIDE JOINT FILLER WITH 5 8" DEEP X 12" WIDE WITH TROWEL OR JOINT TOOL, Revisions
1
SELF LEVELING CAULKING SEALANT SELF LEVELING CAULKING SEALANT 3 SLAB THICKNESS, FULL WIDTH.
DOME SECTION FINISHED GRADE FINISHED GRADE FINISHED GRADE
PROJECT NUMBER:
NO ISOMETRIC
2241067
ELECTRIC PARKING 1.625"- 2.41"
C TO C FILL JOINTS WITH UNILOCK POLYMERIC DRAWN BY:
EMM / SCB
VEHICLE
PARKING
ANY JOINT SAND OR APPROVED EQUIVALENT 1" THICK COMPACTED SETTING BED
OF WASHED COARSE AGGREGATE REVIEWED BY:
SRV / DPB
TIME TYPICAL WARNING UNIT
1.625"-2.41"
ONLY WHILE THIS PART OF DOWEL TO EXPANSION JOINT CONTROL JOINT
C TO C
CHARGING SIDEWALK ACCESS RAMP BE PAINTED AND OILED ISSUED FOR:
1" TO 4"
12" X 18" #4 - 16" LONG SMOOTH DOWEL AT 18" ON-CENTER
SITE PLAN APPROVAL
12" X 18" 2" DIAMETER WEEP HOLE AT LOW POINT
ELECTRIC VEHICLE EDGE OF RAMP CONCRETE DRILL AND EPOXY GROUT INTO EXISTING CONCRETE
ACCESSIBLE SYMBOL CHARGING STATION
NO PARKING FILL WITH SETTING BED MATERIAL SIDEWALK (CENTERED) AND EXISTING BUILDING DATE:
COLOR WHITE ON BLUE BACKGROUND MUTCD R7-1 FOUNDATION AT DOORWAYS. COAT DOWEL IN NEW 4/20/2026
SIDEWALK NOTES:
0.625"
FEDERAL DESIGNATION
7"
SURFACE WITH BOND BREAKER
CURB FLUSH WITH PAVEMENT DRAWING NAME:
1"-4"
1. CONCRETE SHALL BE 4,500 PSI AIR ENTRAINED MIX AT 28 DAYS
2. COMPACTED SUBBASE MATERIAL SHALL COMPLY WITH NYSDOT ITEM 304.14,
RESERVED 1" 0.625"
RESHAPE CURB BACKING
AT WEEP HOLE LOCATION
CONTRACTOR TO RESTORE LAWN DISTURBED BY
CONSTRUCTION AND PROVIDE NEW 6" MECHANICALLY TYPE 4
PARKING 12" X 18" BACK EDGE OF CURB
SCREENED TOPSOIL AND ESTABLISH TURF. 3. CONCRETE SURFACE SHALL RECEIVE A BROOM FINISH AND TWO COATS OF A
MEMBRANE FORMING SEALER AT RATES SPECIFIED BY THE PRODUCT
6" SUBBASE COURSE 5" 4,500 PSI CONCRETE
RESERVED MANUFACTURE.
NY R7-8
FEDERAL DESIGNATION
DOME SPACING SECTION 3"
6" COMPACTED SUBBASE MATERIAL 4. EXPANSION JOINTS SHALL BE PROVIDED AT ALL FITTED STRUCTURES AND AT
EVERY 25' ON CENTER.
CONSTRUCTION DETAILS
NOTES: 5. CONTROL JOINTS SHALL BE EVERY 5' OR AS SHOWN ON THE PLANS AND IN
12" X 6" ACCORDANCE WITH ACI 330-R92. THESE JOINTS SHALL BE COMPLETED
1. QUANTITY OF TRUNCATED DOMES SHOWN IS FOR ILLUSTRATIVE PURPOSES ONLY AND TO DEPICT REQUIRED SQUARE GRID PATTERN.
VAN VAN ACCESSIBLE
2. TRUNCATED DOMES ARE TO BE ALIGNED ON THE SQUARE GRID PATTERN IN THE PREDOMINANT DIRECTION OF TRAVEL.
WITHIN 24 HOURS OF CONCRETE PLACEMENT. SCORED JOINTS SHALL BE
ELECTRIC CHARGING SYMBOL ACCESSIBLE MUTCD R7-8a
3. ENTIRE DETECTABLE WARNING SYSTEM FIELD, INCLUDING TRUNCATED DOMES, IS TO BE DARK GRAY IN COLOR, N7 PER MUNSELL BOOK NOTATION, OR APPROVED EQUIVALENT.
1 1
4-INCH WIDTH MINIMUM AND 3 OF THE THICKNESS OF THE CONCRETE
4'x4', COLOR WHITE ON GREEN FEDERAL DESIGNATION 6. SIDEWALK ADJACENT TO THE CURB SHALL HAVE A 2.00% CROSS-SLOPE TO
4. OUTER EDGE OF THE DETECTABLE WARNING SYSTEM FIELD IS TO BE LOCATED SO THAT THE EDGE OF THE WARNING FIELD NEAREST TO THE STREET IS 1 TO 4 INCHES BEHIND THE BACK
BACKGROUND THE CURB. OTHER AREA AS INDICATED ON THE GRADING PLAN.
EDGE OF THE CURB SECTION.
7. ALL JOINTS AND EXPOSED EDGES SHALL BE ROUNDED WITH JOINT TOOL. DRAWING NUMBER:
5. DETECTABLE WARNING SYSTEM IS TO EXTEND ACROSS THE FULL WIDTH OF A SIDEWALK ACCESS RAMP, BUT NOT UP THE SIDE FLARES. COMPACTED SUBGRADE
PAVEMENT MARKINGS AND SIGNAGE BRICK DETECTABLE WARNING SYSTEM AT CURB CONCRETE SIDEWALK
4/20/2026 1:17:24 PM
3 2 1
C503 N.T.S. C503 N.T.S. C503 N.T.S.
C503
Page 62 of 1493
Page 63
NOT FOR CONSTRUCTION
COVER PIPE CONNECTION TO END INSTALL FLAMP ON 24" (600 mm) ACCESS PIPE OPTIONAL INSPECTION PORT
CAP WITH ADS GEOSYNTHETICS 601T PART #: MCFLAMP
NON-WOVEN GEOTEXTILE
MC-3500 CHAMBER
MC-3500 END CAP
6" MAX
PONDING 4.0H
MAX. PONDING/
HEIGHT 1V
RIM OF CB OVERFLOW ELEV. STORMTECH HIGHLY RECOMMENDS
FLEXSTORM INSERTS IN ANY UPSTREAM 300 Pearl Street, Suite 130
STRUCTURES WITH OPEN GRATES
6" MIN. ORGANIC Buffalo, NY 14202
FILTER MEDIA 716-551-6281
NOTES: ELEVATED BYPASS MANIFOLD
1. CONTRACTOR SHALL INSTALL FILTER MEDIA AFTER SITE HAS BEEN STABILIZED TO labellapc.com
MINIMIZE POTENTIAL OF SEDIMENT CONTAMINATION OF MEDIA.
2. FILTER MEDIA SHALL BE LOAM/SAND MIX, NYSDOT BIO SOIL MIX ITEM #208.01030022,
CONTAINING A MINIMUM OF 85% TO 88% COARSE/MEDIUM SAND BY VOLUME, 8% TO 12%
24" MIN.
SOIL FINES, AND 3% TO 5% ORGANIC MATTER.
FILTER MEDIA 3. ORGANIC FILTER MEDIA SHALL MEET SAME CRITERIA AS ABOVE WITH THE EXCEPTION OF
CONTAINING 10% TO 12% ORGANIC MATTER.
4. SOIL SHOULD FALL WITHIN USCS TYPES SM OR ML WITH PERMEABILITY OF AT LEAST 1.0
FEET PER DAY. SOIL SHOULD BE FREE FROM STONES, STUMPS, ROOTS OR OTHER WOODY SUMP DEPTH TBD BY CATCH BASIN
MATERIAL OVER 1" IN DIAMETER. SITE DESIGN ENGINEER OR MANHOLE
(24" [600 mm] MIN RECOMMENDED)
5. PLACEMENT OF THE PLANTING SOIL SHOULD BE IN LIFTS OF 12" TO 18", LOOSELY
24" (600 mm) HDPE ACCESS PIPE REQUIRED ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN
6"-12" DRAINAGE COMPACTED TO AT MOST 80% PROCTOR TEST. PH RANGE: 5.2 - 7.00. USE FACTORY PARTIAL CUT END CAP PART #: FOUNDATION STONE AND CHAMBERS
GRAVEL JACKET 6. FILTER FABRIC TO BE NON-WOVEN CLASS 'C', MIRAFI 180-N OR APPROVED EQUIVALENT MC3500IEPP24BC OR MC3500IEPP24BW 8.25' (2.51 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
7. DRAINAGE GRAVEL TO MEET AASHTO M-43. NO.67, SIZE 0.25" TO 0.75"
8. CONTRACTOR TO PROVIDE PLANTING SOIL SUBMITTAL SPECIFICATION FOR REVIEW AND
FILTER FABRIC
APPROVAL PRIOR TO CONSTRUCTION.
9. WETLAND SEED MIX SHALL BE USED AS INDICATED IN SPECIFICATIONS. 7 MC-3500 ISOLATOR ROW PLUS DETAIL EXP: EXP:
4" PERFORATED PVC @ 0.2% SUBGRADE OR
10. CONTRACTOR SHALL PROVIDE AT LEAST TWO PERMEABILITY TESTS FOR EACH FACILITY C504 N.T.S.
EXISTING SOIL DRAINAGE GRAVEL
LOCATED AT OPPOSITE SIDES OF FACILITY.
8 BIORETENTION INSERTA TEE DETAIL UNDERDRAIN DETAIL CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
NTS NTS
C504 N.T.S. DO NOT INSTALL STORMTECH STORMTECH LAND SURVEYING: 0021271
INSERTA-TEE AT CHAMBERS STORMTECH CHAMBER GEOLOGICAL: 0021659
CHAMBER JOINTS END CAP
PROVIDE CAST IRON FRAME PROVIDE CAST IRON CLEANOUT THREADED PLUG IP THD OR BRASS A OUTLET MANIFOLD
AND COVER, SET FLUSH SCREW PLUG (HS 67). PVC PLUGS NOT ALLOWED. PROVIDE 1"-3" It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
WITH FINISH GRADE 10" CLEARANCE BETWEEN PLUG & UNDERSIDE OF COVER CONVEYANCE PIPE Sec. 7307, for any person, unless acting under the direction of a licensed
MATERIAL MAY VARY architect, professional engineer, or land surveyor, to alter an item in any
GRADE (PVC, HDPE, ETC.)
FOUNDATION STONE way. If an item bearing the seal of an architect, engineer, or land surveyor
FINISH GRADE FOR UNPAVED AREAS BENEATH CHAMBERS is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
7 1/2"
WITHOUT FRAME AND COVER
1"
date of such alteration, and a specific description of the alteration.
A
ADS GEOSYNTHETICS 601T
17" INSERTA TEE SECTION A-A
CONNECTION
INSERTA TEE TO BE NON-WOVEN GEOTEXTILE DUAL WALL © 2024
2026 LaBella Associates
COMPACTED FILL TAMPED IN 6" INSTALLED, CENTERED PERFORATED
(X)
LAYERS OVER CORRUGATION HDPE
STORMTECH UNDERDRAIN
STORM SECTION A-A SIDE VIEW END CAP
DWV PVC FEMALE ADAPTER, IP PLACE ADSPLUS WOVEN GEOTEXTILE
THREAD x SOCKET (CENTERED ON INSERTA-TEE INLET) OVER
C.O.
BEDDING STONE FOR SCOUR PROTECTION AT
6" RISER: SDR-35 PVC (ASTM D-2241)
WITH SOLVENT WELDED JOINTS LETTERING ON COVER
SIDE INLET CONNECTIONS. GEOTEXTILE MUST
EXTEND 6" (150 mm) PAST CHAMBER FOOT CHAMBER
MAX DIAMETER OF
INSERTA TEE
HEIGHT FROM BASE
OF CHAMBER (X)
B B
HOME LEASING
FOUNDATION STONE
PROVIDE SDR-35 GASKETED NOTES: SC-310 6" (150 mm) 4" (100 mm)
A BENEATH CHAMBERS
75 S CLINTON AVE SUITE 700,
FITTINGS AS NECESSARY; 1/8TH SC-800 10" (250 mm) 4" (100 mm) ROCHESTER, NEW YORK 14604
6" x 6" x 6" SDR-35 TRUE 45 DEGREE BEND, OR TWO 1/16TH BENDS 1. FRAME AND COVER TO BE USED DC-780 10" (250 mm) 4" (100 mm)
NOTES:
ONLY IN PAVED AREAS. ADS GEOSYNTHETICS 601T
WYE WITH BENDS AS NECESSARY COMPACTED CRUSHED STONE FILL · PART NUMBERS WILL VARY BASED ON INLET PIPE MC-3500 12" (300 mm) 6" (150 mm)
A NON-WOVEN GEOTEXTILE
MATERIALS. CONTACT STORMTECH FOR MORE
6" MIN. 6" MIN. DEPTH = 1/2 OD + 12" MIN. 2. CRUSHED STONE: NO. 1 WASHED MC-4500 12" (300 mm) 8" (200 mm)
INFORMATION.
STONE OR A MIX OF NO. 1 AND · CONTACT ADS ENGINEERING SERVICES IF INSERTA TEE MC-7200 12" (300 mm) 8" (200 mm) NUMBER AND SIZE OF UNDERDRAINS PER SITE DESIGN ENGINEER
4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS SECTION B-B
NO. 2 WASHED STONE INLET MUST BE RAISED AS NOT ALL INVERTS ARE INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS
POSSIBLE. 6" (150 mm) TYP FOR SC-800, DC-780, MC-3500, MC-4500 & MC-7200 SYSTEMS
RECOMMENDED METHODS FOR JOINING OF GASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRON
SOLVENT WELD PIPE:
SELECT SELECT
GRANULAR
FILL
GRANULAR
FILL
1. CLEAN DRY HUBS & SPIGOTS
5 MC-3500 INSERTA-TEE INLET 4 MC-3500 UNDERDRAIN
2. APPLY PRIMER TO PARTS BEING C504 N.T.S. C504 N.T.S.
CONNECTED
3. APPLY PVC SOLVENT WELD CEMENT
FLOW DIRECTLY OVER PRIMER
** PVC TYPE IS COMPATIBLE FOR SOLVENT
WELDING TO SDR-35 OR ANY OTHER PVC TYPE I ACCEPTABLE FILL MATERIALS: STORMTECH MC-3500 CHAMBER SYSTEMS
PIPE MADE TO STEEL PIPE OUTSIDE DIMENSIONS
MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT
FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE
6" SDR-35 PVC (ASTM D2241) UNDISTURBED EARTH CRUSHED STONE BEDDING 6" SDR-35 PVC (ASTM D2241) PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED
TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S
SERVICE LATERAL WITH PUSH ON D N/A INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND
SERVICE LATERAL WITH PUSH ON DEPTH=1/2 OD +6" PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.
PREPARATION REQUIREMENTS.
NEOPRENE RUBBER GASKETS NEOPRENE RUBBER GASKETS PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER
6 CLEANOUT FOR NEW STORM LATERAL INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE
GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35%
AASHTO M145¹
A-1, A-2-4, A-3 BEGIN COMPACTIONS AFTER 18" (450 mm) OF MATERIAL OVER
FINES OR PROCESSED AGGREGATE. THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS
C504 N.T.S. C
TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 18" (450 mm)
ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT
MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF
OR IN 12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY
FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY
WEST SENECA APARTMENTS
SUBBASE MAY BE A PART OF THE 'C' LAYER. AASHTO M43¹
THIS LAYER.
3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10
FOR PROCESSED AGGREGATE MATERIALS. 2544 CLINTON ST,
FRAME & GRATE: EJ CASTINGS WEST SENECA, NY 14224
NO. 4 BARS, 4 EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS
RETICULINE GRATE, H-20 LOAD RATED, CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5
AASHTO M43¹
GRASS CONCRETE B FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER NO COMPACTION REQUIRED
BICYCLE PROOF, ADA-COMPATIBLE SIDES (TYP.) 3, 357, 4, 467, 5, 56, 57
ABOVE.
ASPHALT
4,000 PSI CONCRETE POURED IN PLACE FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE AASHTO M43¹
CL SUCH THAT RIM WILL MEET FINISH GRADE. A CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3
SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. 3, 357, 4, 467, 5, 56, 57
PLEASE NOTE:
TOPSOIL 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".
REFER TO ASPHALT 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.
SOILTIGHT ADAPTER PAVEMENT DETAILS 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR
4" MIN
COMPACTION REQUIREMENTS.
SELECT EARTH
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
4. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.
5. WHERE RECYCLED CONCRETE AGGREGATE IS USED IN LAYERS 'A' OR 'B' THE MATERIAL SHOULD ALSO MEET THE ACCEPTABILITY CRITERIA OUTLINED IN TECHNICAL NOTE 6.20 "RECYCLED CONCRETE STRUCTURAL BACKFILL".
ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL NO: DATE: DESCRIPTION:
AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS
TYPE 1 OR 2 SUBBASE PAVEMENT LAYER (DESIGNED Revisions
BY SITE DESIGN ENGINEER)
2" DEEP x 2" WIDE
XX" STANDARD H-20 GRATE CONSTRUCTION JOINT MINIMUM COVER ELEVATION: XX
EXPOXY GROUT 100% 6"
PLAN SOLIDS (TYP.) 30" SQUARE
TYP. ALL WALLS D *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED
8'
PROJECT NUMBER:
PERIMETER STONE
C
INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,
INCREASE COVER TO 24" (600 mm). 18" (450 mm) (2.4 m) 2241067
CONNECT UNDERDRAIN WHERE SHOWN (SEE NOTE 4) MIN* MAX
OR PROVIDE (2) 10 FOOT STUBS OF 12" (300 mm) MIN
TOP CHAMBER ELEVATION: XX DRAWN BY:
PERFORATED PVC, OPPOSITE SIDES. B
100 YEAR PEAK ELEVATION: XX EMM / SCB
PRECAST SECTION ASTM C-478 EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
REVIEWED BY:
MEETING HS-20 LOADING 45" 10 YEAR PEAK ELEVATION: XX SRV / DPB
(1143 mm)
XX" DRAIN BASIN ISSUED FOR:
SEE PLAN
VARIES
BASE CHAMBER ELEVATION: XX SITE PLAN APPROVAL
A 1 YEAR PEAK ELEVATION: 1069.54 BASE STONE ELEVATION: XX
6" MIN.
9" (230 mm) MIN DATE:
(SEE NOTE 3) 4/20/2026
2.5' SEPARATION
6" (150 mm) MIN
SEE PLAN FOR DIAMETER MC-3500 6"
77" (1956 mm) 12" (300 mm) MIN
END CAP SUBGRADE SOILS (150 mm) MIN DRAWING NAME:
(SEE NOTE 3) **THIS CROSS SECTION DETAIL REPRESENTS
MINIMUM REQUIREMENTS FOR INSTALLATION.
GROUNDWATER ELEVATION: XX
6" MIN. STONE BEDDING
ALL CONCRETE
NOTES: PLEASE SEE THE LAYOUT SHEET(S) FOR
TO LIMITS OF EXCAVATION. PROJECT SPECIFIC REQUIREMENTS.
TO BE 4,000 PSI 1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS"
SAME MATERIAL USED
CHAMBER CLASSIFICATION 45x76 DESIGNATION SS.
6" MIN.
FOR SEWERS.
SOILTIGHT ADAPTER 2. MC-3500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
NOTES:
3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION
FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. REFERENCE STORMTECH DESIGN MANUAL FOR BEARING CAPACITY GUIDANCE.
CONSTRUCTION DETAILS
6" STONE BASE
4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.
1. THE ENTIRE EXTERIOR & INTERIOR SURFACES OF THE CATCH BASIN SHALL BE PAINTED WITH TWO COATS OF 5. REQUIREMENTS FOR HANDLING AND INSTALLATION:
BITUMASTIC COATING. · TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.
2. CATCH BASIN SHALL NOT BE CONNECTED TO ANY SANITARY SEWER. · TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3” (75 mm).
3. PROVIDE FRAMES AND GRATES CONFORMING TO NYSDOT STANDARD SHEETS M655-10R3, M655-6. · TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 500 LBS/FT/%.
SECTION 4. FRAMES TO HAVE APPROPRIATE STRAP ANCHORS. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS.
DRAWING NUMBER:
3 DRAIN BASIN 2 CATCH BASIN 1 MC-3500 CROSS SECTION
4/20/2026 1:17:45 PM
C504 N.T.S. C504 N.T.S. C504 N.T.S.
C504
Page 63 of 1493
Page 64
NOT FOR CONSTRUCTION
STANDARD C.I. MANHOLE FRAME & COVER.
SEE SPECIFICATIONS FOR COVER TYPE OPENING SHALL BE CORED & FILLED WITH EPOXY
MORTER SIKADUR 33 BY SIKE OR FLEXOLITH GEL
15" MAX. GRADE RINGS AS NECESSARY BY DURAL TO MAKE WATERTIGHT CONNECTION.
PRECAST OPENINGS ARE ALSO ALLOWED.
24" I.D. PRECAST REINFORCED CONCRETE PROVIDE FLEXIBLE WATERTIGHT CONNECTION.
WITH ECCENTRIC OPENING WILL BE GASKET SHALL MEET ASTM C-923
REQUIRED FOR MANHOLE WITH A 300 Pearl Street, Suite 130
12" MAX. DEPTH GREATER THAN 6'-0" FINISHED GRADE REMOVABLE CAST IRON COVER
LABEL "WATER" (PAINT BLUE)
Buffalo, NY 14202
TAPERED TOP 716-551-6281
ASTM C-748
labellapc.com
SEE NOTE 2 PRECAST REINFORCED CONC.
MANHOLE SECTION 2' 2-PIECE ADJUSTABLE
THROUGH 8' LENGTHS AS CAST IRON VALVE BOX
MINIMUM COVER
STEPS 12" O.C.
REQUIRED WITH A 4" HIGH MAX.
(SEE NOTE 5)
CAST IN PLACE .
TOP SECTION (ASTM C-478) " I.D STONE FULL WIDTH OF
24
COAT INTERIOR AND EXTERIOR TRENCH AROUND
WITH 2 COATS SIKAGARD 62, VALVE BOX
DURALKOTE 312 OR
GATE VALVE
APPROVED EQUIVALENT.
RUBBER GASKETS 12" MIN. WATER MAIN
(ASTM C-443) RETAINER GLAND
(SEE NOTE 6)
15" MAX.
EXP: EXP:
.
I.D
PIPE BEDDING CERTIFICATE OF AUTHORIZATION NUMBER:
3" MIN.
PLAN PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
8" MIN.
COMPACTED SELECT MINIMUM MANHOLE DIAMETERS UNDISTURBED EARTH SOLID CONCRETE BLOCK (MIN.
GEOLOGICAL: 0021659
GRANULAR FILL PIPE DIAMETERS 4" x 8" x 16") 1 REQUIRED AT
# OF NOTES: DIP WATER MAIN
CONNECTIONS 8" 10" 12" 15" 16" 18" 21" 24" 30" 36" 42" & UP It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
5,000 PSI CONCRETE 6" CRUSHER RUN SUBBASE COURSE, 1. VALVE BOXES SHALL BE CENTERED ON VALVE AND SET ON COMPACTED BACKFILL.
UNDISTURBED Sec. 7307, for any person, unless acting under the direction of a licensed
NYSDOT ITEM 304 TYPE 2 SOIL OR ROCK ONE 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' 2. VALVE SHALL NOT SUPPORT VALVE BOX. architect, professional engineer, or land surveyor, to alter an item in any
NOTE: 3. BODY AND BONNET BOLTS SHALL BE STAINLESS STEEL. way. If an item bearing the seal of an architect, engineer, or land surveyor
ELEVATION TWO 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' REQUIRES
4. VALVES SHALL BE OPEN RIGHT. is altered; the altering architect, engineer, or land surveyor shall affix to
SPECIAL
1. PRECAST REINFORCED CONCRETE BASE REQUIRED FOR MANHOLE WITH DEPTH GREATER THAN 4' 4' 4' 4' 4' 4' 5' 5' 5' 5' MANHOLE 5. MINIMUM COVER SHALL BE AS SHOWN ON WATER MAIN TRENCH DETAIL. the item their seal and notation "altered by" followed by their signature and
THREE
6'-0". 6. RETAINER GLANDS NOT REQUIRED AT HYDRANT GUARD VALVES. GUARD VALVES SHALL BE date of such alteration, and a specific description of the alteration.
2. REFER TO TABLE FOUR 4' 4' 4' 5' 5' 5' 5' 5' 5' 5' RESTRAINED WITH ANCHOR PIPE.
3. MANHOLES ARE TO BE FLANGED AND WATER TIGHT IN HIGH WATER TABLE AREAS 7. REFER TO PLANS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
© 2024
2026 LaBella Associates
8 CONCENTRIC STORM MANHOLE 7 MJ GATE VALVE
C505 N.T.S. C505 N.T.S.
MINIMUM MANHOLE DIAMETERS
# OF
CONNECTIONS
PIPE DIAMETERS
HOME LEASING
8" 10" 12" 15" 16" 18" 21" 24" 30" 36" 42" & UP
75 S CLINTON AVE SUITE 700,
2" MIN.
ONE 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' ROCHESTER, NEW YORK 14604
TWO 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' REQUIRES
SPECIAL
THREE 4' 4' 4' 4' 4' 4' 5' 5' 5' 5' MANHOLE
LETTERING FOUR 4' 4' 4' 5' 5' 5' 5' 5' 5' 5'
ON COVER
STANDARD CI MH FRAME & COVER W/ MORTAR LEVELING COURSE, IN WATERTIGHT CI MH FRAME & COVER, SET IN MORTAR 6 WATER QUALITY UNIT
PAVED AREAS WITH GROUND WATER LEVEL GREATER THAN 30" BELOW LEVELING COURSE, IN UNPAVED AREAS WITH GROUND
8" MIN THICK REINF. TOP C505 N.T.S. FINISHED GRADE
FINISHED GRADE. WATER LEVEL LESS THAN 30" BELOW FINISHED GRADE
SLAB WITH 24" DIA. (SANITARY ONLY)
OPENING, SEE NOTE 7
CONCRETE ADJUSTING RINGS WITH
MIN. COVER
FINISHED GRADE
SEE NOTE 3
BITUMASTIC COATING ON INTERIOR SURFACE
FINISHED GRADE PROPOSED OR
MAX.
PRECAST REINF. CONC. MH, ASTM C478, 2'
18"
EXISTING WATER
6' MIN. IN PAVEMENT
THRU 8' HEIGHT AS NECESSARY. 4' MAX PROPOSED OR MAIN
5' MIN. IN LAWN
HEIGHT FOR TOP SECTION. ECCENTRIC CONE PROVIDE WATERTIGHT CONNECTION. TRACER WIRE FOR EXISTING UTILITY
4" MAX. TOP SECTION NOT SHOWN, SEE NOTE 7 PRECAST USE PRECAST RUBBER GASKET. WATER SERVICE PIPE
MAX
RUBBER GASKETS AT JOINTS, (ASTM C443) OPENING
12"
BACKFILL WITH SELECT FILL 45° BEND
WITH BUTYL RESIN STRIP SEALANT, ASTM WYE BRANCH FOR DROPS OVER IN ROADWAY, SIDEWALK, AND
C990, ON INSIDE & OUTSIDE LEDGE BRICK OR PVC 4', TEE DROPS FOR UP TO 4' DRIVEWAY AREAS. USE NATIVE SEPARATION
CAP TO 1/2 ID D=
SOIL IN GRASS AREAS. COMPACT DISTANCE
6"
STEPS 12" O.C. COATING (SEE NOTE 8) PROVIDE VERTICAL
VERTICAL SEE TABLE CL IN A MAXIMUM OF 6" LIFTS. RESTRAINT IN
CL
ZONE
PIPE
CAST IN PLACE 30° BEND WHEN
ACCORDANCE WITH THE
WYE IS USED IN ROCK, BACKFILL PIPE
VERTICAL THRUST
WEST SENECA APARTMENTS
CENTERLINE OF MH
ZONE WITH SAND
BLOCK DETAILS (TYP.)
6"
SEE NOTE 2
VERT. DROP SAME SIZE 2544 CLINTON ST,
COMPACTED 1/2 ID WATER SERVICE
AS THE SEWER ENTERING WEST SENECA, NY 14224
SELECT
THE MH, 8" MIN. NOTES:
GRANULAR FILL CL
"DIM. A"
90° ELBOW CL
PROVIDE FLEXIBLE WATERTIGHT CONNECTION. 1. SEPARATION DISTANCE DIMENSION D, (OUTSIDE EDGE TO OUTSIDE EDGE) SHALL BE PROVIDED AS FOLLOWS:
GAS AND WATER LINES D = 12" MIN. SANITARY FORCEMAINS, STORM SEWERS, AND SANITARY SEWERS D = 18" MIN.
MIN.
GASKET SHALL MEET ASTM C-923 6" MIN. IN ROCK
6"
TRENCH LIMITS 2. ONE STANDARD FULL LENGTH OF WATER MAIN SHALL BE CENTERED UNDER THE SEWER SO THAT BOTH JOINTS WILL BE AS FAR FROM THE SEWER
MAX.
6" MIN. FORMED 12" MIN. IN SOIL
15"
NORMAL PIPE DIA + 24" AS POSSIBLE.
CONCRETE ENCASEMENT 3. MIN, COVER DEPTH - SEE WATER MAIN TRENCH DETAIL.
S
ID
L OF DROP, 3,000 PSI
PIPE BEDDING
5 WATER SERVICE TRENCH 4 TYPICAL WATER MAIN VERTICAL TRANSITION
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
12" MIN.
C505 N.T.S. C505 N.T.S. AT EXISTING PAVEMENT:
INITIAL SAWCUT TYPICAL
UNDISTURBED
3" MIN.
NO: DATE: DESCRIPTION:
MIN.
12" MIN. CRUSHED STONE: EXTEND MIN. 12" EACH SIDE OF TRENCH.
8"
UNDISTURBED GROUND
SUBBASE BEYOND EXTERIOR EDGES OF STRUCTURE EXISTING OR (SEE PAVEMENT JOINT DETAIL Revisions
GROUND 5.5' BURY HYDRANT TO BE
COURSE 4,000 PSI CONC. BENCH. SLOPE PROPOSED SURFACE FOR PAVEMENT RESTORATION)
PROVIDE DROP WHERE DIM. "A" IS EQUAL TO OR GREATER THAN 2' INSTALLED W/ 4-1/2" NOZZLE
TOP OF BENCH @ 1/2"/FT. MIN. FACING THE ROADWAY
SECTION A-A TO DRAIN
FOR SANITARY SEWERS, OR EQUAL TO OR GREATER THAN 5' FOR
STORM SEWERS, UNLESS NOTED OTHERWISE ON PLANS. PROJECT NUMBER:
SECTION A-A GRADE 2241067
(FOR OUTSIDE DROP CONNECTION & WATERTIGHT MH FRAME & COVER) DRAWN BY:
FOR SURFACE RESTORATION
REFER TO ADDITIONAL DETAILS
EMM / SCB
NOTES: VALVE BOX
REVIEWED BY:
12" MIN SRV / DPB
1. IF AN INVERT IS NOT GIVEN, THE CROWN OF THE INFLUENT SEWER(S) SHOULD BE AT THE TRENCH BACKFILL MATERIAL
RADIUS NOT SAME LEVEL OR ABOVE THE CROWN OF THE OUTLET SEWER. EXTENSION ISSUED FOR:
LESS
-ROADWAY SIDEWALK AND ALL DRIVEWAY
SITE PLAN APPROVAL
THAN 1/2 MH ID 2. PIPE CONNECTIONS 6" DIAMETER AND SMALLER MAY BE FIELD CORED. CORED OPENINGS IN SAFE OPERATION
MANHOLE RISER SECTIONS SHALL BE NOT LESS THAN 6" FROM A RISER JOINT. SHEET PILING AREAS: SELECT GRANULAR FILL.
WARNING DATE:
A A (AS REQUIRED) TAPE
3. ALL RISER JOINTS SHALL BE RUBBER RING GASKETS CONFORMING TO ASTM C443 WITH -NON PAVED AREAS: 4/20/2026
FLEXIBLE JOINT SEALER ON OUTSIDE OF JOINTS. BASE SHALL BE COMMON EARTH BACKFILL
#1 WASHED STONE FOR DRAWING NAME:
4. PRECAST BASES, RISER SECTIONS & TOP SLABS SHALL CONFORM WITH ASTM C478, W/ WIDTH OF HYDRANT TRENCH
FLOW
A
HS-20 LOADING AND 30% IMPACT LOADING DESIGN.
NEW FLEXIBLE CONNECTOR
NOTE:
PIPE ZONE
COUPLING PVC x APPLICABLE PIPE BEDDING MATERIAL:
SHAPED 5. CONCRETE FOR STRUCTURE SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF SOLID CONCRETE BLOCK
EXISTING MATERIAL AS 4,000 PSI. (MIN.: 8"x8"x16")
PIPE
O.D.
INVERT NYSDOT 703-0201 50-50 BEDDING AND BACKFILL MATERIAL
NECESSARY WITH STAINLESS WATER MAIN
MIXTURE OF PRIMARY INSTALLED & COMPACTED IN
MAX.
6. INVERT AND BENCH MAY BE CONSTRUCTED WITH BRICK OR POURED CONCRETE. PVC
2'-0"
STEEL SHEAR BAND MAXIMUM 6" LIFTS.
AND/OR ABS PIPE SHALL NOT BE USED WITHIN THE MANHOLE. SIZE 1 & 2
CONSTRUCTION DETAILS
B
7. ECCENTRIC CONE TYPE TOP SECTIONS FOR MANHOLES SHALL BE USED WHERE THE INSIDE IN ROCK, BACKFILL PIPE PIPE DIA. DIM. A DIM. B
SOLID CONCRETE BLOCK 6"x18" (MIN.) ANCHOR PIPE
HEIGHT DIMENSION FROM THE BENCH WALL TO THE BOTTOM OF THE ECCENTRIC SECTION MJ ANCHOR TEE, 6" OUTLET ZONE WITH SAND A A
EXCEEDS 8', OTHERWISE PROVIDE FLAT SLAB TOP SECTIONS. (MIN.: 4"x4"x8") UP TO 18" 1'-0" (MIN.) 6"
EXISTING RCP, CIP 6" MJ GATE VALVE 6" MIN. PIPE 6" MIN.
OR VTP TO REMAIN 8. INSIDE AND OUTSIDE OF MANHOLE TO BE EPOXY COATED TO ONE FOOT ABOVE THE HIGHEST NOTES: IN ROCK O.D. IN ROCK 19" TO 36" 1'-6" (MIN.) 9"
PIPE CROWN. AREAS OUTSIDE OF ONE FOOT ABOVE HIGHEST PIPE CROWN TO RECEIVE TWO
COATS OF BITUMASTIC COATING ON BOTH THE INSIDE AND OUTSIDE OF MANHOLE. 1. HYDRANT TO BE MUELLER SUPER CENTURION 250 - MODEL A-423 OR APPROVED EQUAL. OVER 36" 2'-0" (MIN.) 12"
2. HYDRANT TO BE PAINTED RED.
3. HYDRANT MAIN VALVE SEAT SHALL BE 4 1/2" IN DIAMETER. DRAWING NUMBER:
4. HYDRANT VALVE TO TURN LEFT.
SANITARY MANHOLE HYDRANT ASSEMBLY STORM/SANITARY SEWER TRENCH AND PIPE BEDDING
4/20/2026 1:17:28 PM
3 2 1
C505 N.T.S. C505 N.T.S. C505 N.T.S.
C505
Page 64 of 1493
Page 65
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
VALVE BOX COVER SHALL 716-551-6281
BE LABELED "WATER"
FINISHED GRADE
labellapc.com
ROW
CURB STOP
TRACER WIRE RAN UP
OUTSIDE OF BOX, AS
REQUIRED
THREE PIECE CAST IRON
VALVE BOX
APPROVED BACKFILL
EXP: EXP:
MATERIAL
TAP VALVE (FLxMJ)
FUTURE CURB BOX CERTIFICATE OF AUTHORIZATION NUMBER:
5'-0" MIN.
TAPPING SLEEVE PROFESSIONAL ENGINEERING: 0021272
APPROVED BEDDING LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
MATERIAL
FUTURE CONNECTION TO
SOLID CONCRETE
EXISTING SERVICE WITH
BLOCKS (TYP.)
CURB STOP SUPPORTED It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
BY A SOLID CONCRETE Sec. 7307, for any person, unless acting under the direction of a licensed
BLOCK (4"x8"x8") architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
3
4", 1", OR 2" TYPE 'K'
COPPER TUBING © 2024
2026 LaBella Associates
CORPORATION STOP
UNDISTURBED EARTH WATERMAIN
NEW WATERMAIN
SOLID CONCRETE BLOCK
(4"x8"x16") WITH SOLID CONCRETE BLOCK
HARDWOOD SHIMS (4"x8"x16") WITH
HARDWOOD SHIMS
HOME LEASING
NOTES: 75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
1. VALVE SHALL NOT SUPPORT VALVE BOX.
NOTES:
2. TAP VALVE SHALL BE INSTALLED LEVEL AND VERTICALLY PLUMB.
1. AFTER COMPLETION OF TESTING, THE SAMPLE POINT SHALL BE UTILIZED FOR A SERVICE CONNECTION. IF UNABLE TO UTILIZE FOR A SERVICE
REPLACE THE CORPORATION STOP IN PIPE WITH A THREADED BRASS PLUG. 3. VALVE BOX SHALL BE PLUMB TO GRADE, WITH OPERATING NUT CENTERED IN BOX.
5 TEMPORARY BLOW-OFF / SAMPLE POINT 4 TAPPING SLEEVE AND VALVE
C506 ECWA STANDARD DETAIL C506 ECWA STANDARD DETAIL
B B B TRENCH UNDER OR WITHIN 5'-0" OF
ASPHALT OR CONCRETE PAVEMENT,
TRENCH UNDER OTHER AREA DRIVEWAY, SIDEWALK OR PARKING LOT
TRENCH UNDER OR WITHIN 5'-0" OF
ASPHALT OR CONCRETE PAVEMENT, PAYMENT LIMIT
A
A
A
TRENCH UNDER OTHER AREA DRIVEWAY, SIDEWALK OR PARKING LOT FOR ASPHALT
AND CONCRETE
1'-0" RESTORATION
TYP.
WEST SENECA APARTMENTS
A
A
A
PAYMENT LIMIT FOR
EXISTING GRADE ROCK EXCAVATION
INITIAL SAW CUT
2544 CLINTON ST,
AND SELECT FILL 1'-0"
PLAN PLAN PLAN WEST SENECA, NY 14224
FINAL SAW CUT
SOLID CONCRETE SOLID CONCRETE
SOLID CONCRETE EXISTING GRADE EXISTING PAVEMENT
BLOCK (TYP.) BLOCK (TYP.)
BLOCK (TYP.)
C
C
C
4'-0" MIN. COVER (PIPE ≥16")
5'-0" MIN. COVER (PIPE <16")
C
C
C
1'-6" CLEARANCE BETWEEN EXISTING SUITABLE EXCAVATED
UTILITY AND TOP OF WATERMAIN / CASING BACKFILL (PROPERLY
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
(INCREASE TO 3'-0" WHEN CROSSING STORM SELECT BACKFILL COMPACTED) DETECTABLE TAPE IN TRENCH 1'-6"
PROFILE PROFILE PROFILE SEWERS >36") (COMPACTED IN 6" LIFTS) BELOW GRADE (CONNECTED TO
1'-0" (PIPE <16") VALVE BOXES) NO: DATE: DESCRIPTION:
DEAD END HORIZONTAL BEND TEE PIPE BEDDING 2'-0" (PIPE ≥16")
Revisions
TYP. SELECT BACKFILL
(COMPACTED IN 6" LIFTS)
6"
PROJECT NUMBER:
2241067
H
6"
TRACER WIRE (NON-METALLIC PIPE), TAPED
AT 5'-0" INCREMENTS TO THE CROWN OF DRAWN BY:
EMM / SCB
6"
PIPE (CONNECTED TO VALVE BOXES)
WATERMAIN REVIEWED BY:
PLAN SRV / DPB
EPOXY COATED #5 PIPE BEDDING
6"
ISSUED FOR:
REBAR (TYP.) UNDISTURBED EARTH OR
ROCK TRENCH BOTTOM
SITE PLAN APPROVAL
WATERMAIN
DATE:
4/20/2026
D
UNDISTURBED EARTH OR
12" ROCK TRENCH BOTTOM
DRAWING NAME:
W
NOTES: 2" RIGID INSULATION BOARD, PLACED
ON TOP AND EACH SIDE
PROFILE 1. ALL EXISTING UTILITIES MUST BE SUPPORTED WITH APPROPRIATE CHAINS / STRAPS DURING CONSTRUCTION OF THE NEW WATERMAIN.
CONTRACTOR IS REQUIRED TO COORDINATE WITH THE OWNER FOR THEIR PREFERRED SUPPORT REQUIREMENTS.
2'
VERTICAL BEND 2. WHEN CROSSING A SEWER LINE WITH NEW WATERMAIN (AND WITHOUT A CASING PIPE), ONE FULL LENGTH (18'-0" MIN.) SHALL BE USED AT CONSTRUCTION DETAILS
W THE POINT OF CROSSING. THE WATERMAIN SHALL BE PLACED SO THAT BOTH JOINT ENDS ARE AS FAR AS POSSIBLE FROM THE EXISTING
NOTE: SEWER. FROST PROTECTION TRENCH
(COVER <4'-0")
FULL CONCRETE THRUST BLOCKS AS SHOWN ARE REQUIRED WHEN THRUST 3. IF CASING PIPE IS USED, IT SHALL EXTEND 5'-0" BEYOND THE EXISTING PIPE OUTER EDGE IN EACH DIRECTION, AND NO WATERMAIN JOINTS ECWA APPROVAL REQUIRED
RESTRAINT IS NOT PROVIDED BY OTHER MEANS SUCH AS MJ RESTRAINTS *LENGTHS SHOWN ARE MINIMUM REQUIREMENTS OR FITTINGS SHALL BE LOCATED WITHIN 4'-0" FROM THE CASING PIPE EDGE.
DRAWING NUMBER:
3 THRUST BLOCKS 2 PIPE CROSSING DETAIL 1 TYPICAL TRENCH DETAIL
4/20/2026 1:17:25 PM
C506 ECWA STANDARD DETAIL C506 ECWA STANDARD DETAIL C506 ECWA STANDARD DETAIL
C506
Page 65 of 1493
Page 66
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2024
2026 LaBella Associates
HOME LEASING
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
4 STANDARD FRAME AND COVER DETAIL 3 CLEANOUT IN PAVEMENT/SIDEWALK DETAIL
C507 ERIE COUNTY SEWER STANDARD DETAIL C507 ERIE COUNTY SEWER STANDARD DETAIL
WEST SENECA APARTMENTS
2544 CLINTON ST,
WEST SENECA, NY 14224
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
NO: DATE: DESCRIPTION:
Revisions
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
CONSTRUCTION DETAILS
DRAWING NUMBER:
4/20/2026 1:17:17 PM
2 CLEANOUT DETAIL FOR SERVICE CONNECTION 1 TYPICAL COMMERCIAL SERVICE WITHOUT BASEMENT DETAIL
C507 ERIE COUNTY SEWER STANDARD DETAIL C507 ERIE COUNTY SEWER STANDARD DETAIL
C507
Page 66 of 1493
Page 67
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2024
2026 LaBella Associates
HOME LEASING
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
WEST SENECA APARTMENTS
2544 CLINTON ST,
WEST SENECA, NY 14224
FURNISH AND INSTALL IN LINE FUSES.
BUSSMAN "TRON" WEATHERPROOF FUSES NO: DATE: DESCRIPTION:
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
GASKETED HAND HOLE HOLDERS #HEB-AD WITH "LP-CC" TIME DELAY Revisions
FUSES FOR EACH LUMINAIRE
VARIES - CONCRETE BASE TO BE INSTALLED FLUSH WITH PROJECT NUMBER:
3 PARKING LOT STEEL POLE (MC-01 POLE) FINISHED GRADE OR UP TO 36" EXPOSED. REFER TO SITE
LIGHTING SUMMARY ON UTILITY PLAN(S)
2241067
C508 N.T.S. 36" DRAWN BY:
MAX EMM / SCB
FINISHED GRADE REVIEWED BY:
SRV / DPB
GALVANIZED STEEL 'J' BOLTS (TYP. OF 4) ISSUED FOR:
3" MIN SITE PLAN APPROVAL
COVER
1" PVC SCHEDULE 80 CONDUIT DATE:
24" MIN
(TYP. OF 2) 4/20/2026
66" MIN
DRAWING NAME:
#6 CU GROUND WIRE 3/4" PVC SCHEDULE 80 CONDUIT FOR GROUND
ROD. CONNECTION AS REQUIRED.
EXOTHERMIC WELD
6#6 VERTICAL RODS AND
#3 TIES @ 12" O.C.
1/2"Øx8' CU DRIVEN
24"Ø CONSTRUCTION DETAILS
GROUND ROD.
PVC CONDUIT FITTING
DRAWING NUMBER:
2 TYPICAL SITE LIGHTING POLE BASE DETAIL 1 LIGHTING FIXTURES / PHOTO METRICS
4/20/2026 1:17:42 PM
C508 N.T.S. C508 N.T.S.
C508
Page 67 of 1493
Page 68
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
WOVEN TREE STAKING MATERIAL (DEEPROOT ARBORTIE OR
APPROVED EQUAL, TWO TIES PER TREE, SPREAD 180° APART).
LOCATE 6" FROM TOP OF STAKE UP TO LOWEST BRANCHES.
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
TWO 3" DIAMETER X 8' CEDAR STAKE
ABOVE GROUND TO LOWEST BRANCHES GEOLOGICAL: 0021659
GROUND LINE TO BE SAME AS AT THE
1 NURSERY
2 ROOT BALL DIAMETER
GROUND LINE TO BE THE SAME AS AT THE NURSERY. It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
REMOVE ALL TWINE & STRAPS. CUT AND REMOVE TOP 1/3 OF Sec. 7307, for any person, unless acting under the direction of a licensed
BURLAP. WIRE CAGE AND ALL SYNTHETIC MATERIALS SHALL PRUNE ONLY DEAD, BROKEN OR
architect, professional engineer, or land surveyor, to alter an item in any
BE TOTALLY REMOVED. DAMAGED BRANCHES
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
SET TOP OF ROOT BALL FLUSH TO GRADE 3" SHREDDED HARDWOOD MULCH - EXTEND date of such alteration, and a specific description of the alteration.
OVER SAUCER BERM
3" DEPTH SHREDDED HARDWOOD MULCH; KEEP
6" FROM TRUNK OF TREE TO MAINTAIN A VISIBLE ROOT CONSTRUCT EARTH SAUCER WITH 4" HIGH
FLARE. BERM © 2024
2026 LaBella Associates
CONSTRUCT EARTH SAUCER WITH 4" HIGH BERM-FLOOD
WITH WATER TWICE IN FIRST 24 HRS. REMOVE ALL TWINE & STRAPS. CUT AND REMOVE BURLAP
~
AND WIRE BASKET FROM TOP 1/3 OF ROOTBALL. REMOVE
ALL SYNTHETIC MATERIALS AND TAGS.
BREAK UP OR LOOSEN
6"
MIN
BACKFILL WITH PLANTING SOIL MIXTURE IN 9"
HOME LEASING
SUBSOIL LAYERS. WATER EACH LAYER UNTIL SETTLED. DO 75 S CLINTON AVE SUITE 700,
BACKFILL WITH PLANTING SOIL MIXTURE
2X ROOT BALL DIAMETER
IN 9" LAYERS. WATER EACH LAYER UNTIL SETTLED. DO NOTE: NOT TAMP. ROCHESTER, NEW YORK 14604
NOT TAMP. 1. PROVIDE A CONTINUOUS MULCHED PLANTING BED FOR
NOTE: ALL SHRUB PLANTINGS.
1. REMOVE STAKES AND GUYS AT THE END OF BREAK UP OR LOOSEN SUBSOIL WITH A PICK 2. DO NOT OVERSEED SHRUBS IN PLANTING BEDS OR
THE FIRST GROWING SEASON AFTER PLANTING PITS IN MAINTAINED LAWN AREAS
2. PROVIDE A 6' DIA. MULCHED PLANTING BED AROUND EACH TREE.
3. DO NOT OVERSEED TREE PLANTING PITS IN MAINTAINED LAWN AREAS.
DECIDUOUS TREE PLANTING 3 SHRUB PLANTING
4
L501 N.T.S.
L501 N.T.S.
2" DEPTH MULCH
WEST SENECA APARTMENTS
2544 CLINTON ST,
WOVEN TREE STAKING MATERIAL (DEEPROOT WEST SENECA, NY 14224
SUBSOIL TO BE 18" DEEP BED OF PLANTING
ARBORTIE OR APPROVED EQUAL)
BROKEN WITH SOIL MIXTURE
A PICK AXE
3" DIAMETER X 8' CEDAR OR
PRESSURE TREATED STAKE, TWO NOTE: GROUND COVERS SHALL BE POT OR CONTAINER GROWN.
OPPOSITE.
SET TOP OF ROOT BALL FLUSH TO GROUNDCOVER SECTION
GRADE
GROUND LINE TO BE THE SAME AS
AT THE NURSERY. REMOVE ALL PLANTS SHALL BE SET AT THE
TWINE & STRAPS. CUT AND REMOVE 2" DEPTH MULCH;
SAME GROUND LINE AS IN THE
TOP 1/3 OF BURLAP. WIRE CAGE AND ALL SYNTHETIC DO NOT MOUND
CONTAINER
MATERIALS SHALL BE TOTALLY REMOVED. MULCH OVER ROOT
NO: DATE: DESCRIPTION:
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
COLLAR
PLANTING SOIL FIRM SOIL AROUND Revisions
3" MIN. SHREDDED HARDWOOD MULCH - ROOT BALL WITH HANDS
KEEP 6" FROM TRUNK OF TREE, TO MAINTAIN VISIBLE MIXTURE
ROOT FLARE
PROJECT NUMBER:
SUBSOIL
2241067
DRAWN BY:
CONSTRUCT EARTH SAUCER WITH 4" HIGH EMM / SCB
BERM-FLOOD WITH WATER TWICE IN FIRST 24 PERENNIAL SECTION
HRS. REVIEWED BY:
SRV / DPB
BACKFILL WITH PLANTING SOIL MIXTURE IN 9" LAYERS.
WATER EACH LAYER UNTIL SETTLED. DO NOT TAMP. NOTES: ISSUED FOR:
1. PROVIDE 18" DEPTH PLANTING SOIL MIX , ADD SITE PLAN APPROVAL
BREAK SUBSOIL WITH A PICK FERTILIZER WHEN MIXING. DO NOT COMPACT AFTER PLANTING.
2X ROOT BALL DIA.
2. WATER THOROUGHLY AFTER PLANTING. DATE:
4/20/2026
3. PROVIDE WELL DRAINING SUBSOIL WHEN SOIL IS HEAVY
NOTE: OR COMPACTED. DRAWING NAME:
1. REMOVE STAKES AND GUYS AT THE END OF
4. PLANTS SHALL BE REMOVED FROM ALL CONTAINERS WHEN
THE FIRST GROWING SEASON AFTER PLANTING
PLANTED, UNLESS OTHERWISE STATED IN THE PLANT SCHEDULE.
2. PROVIDE A 6' DIA. MULCHED PLANTING BED AROUND EACH TREE.
3. DO NOT OVERSEED TREE PLANTING PITS IN MAINTAINED LAWN AREAS.
EVERGREEN TREE PLANTING PERENNIAL - GROUNDCOVER PLANTING
2 1 LANDSCAPE DETAILS
L501 N.T.S. L501 N.T.S.
DRAWING NUMBER:
4/20/2026 1:17:53 PM
L501
Page 68 of 1493
Page 69
FIBER CEMENT PANEL - BRICK -
HARDIE "COBBLESTONE" WATSONTOWN "ELK"
FIBER CEMENT BOARD
AND BATTEN -
HARDIE "IRON GRAY"
ALTERNATE MATERIAL: ALTERNATE MATERIAL:
FIBER CEMENT SIDING FIBER CEMENT SIDING
- HARDIE "BOOTHBAY BLUE" - HARDIE "MONTEREY TAUPE"
VINYL SIDING - VYTEC VINYL SIDING - VTEC
PRESTIGE "LAKESHORE BLUE" PRESTIGE "SPRING MEADOW"
3D View and Material Palette
Home Leasing - West Seneca
Page 69 of 1493
Page 70
T.O. PARAPET E9 E3
+37' - 0" ELEVATION KEY NOTES
E8
T.O. ROOF NO. DESCRIPTION
+32' - 0" E1 MASONRY VENEER. COLOR AND PATTERN TBD.
E2 FIBER CEMENT PANEL SYSTEM. COLOR TBD
E11 E3 FIBER CEMENT BOARD AND BATTEN SYSTEM. COLOR TBD
LEVEL 3 VINYL LAP SIDING, 7" EXPOSURE. COLOR TBD. (ALTERNATE MATERIAL: FIBER CEMENT
E2 E4
+22' - 0" SIDING)
E5 ALUMINUM STOREFRONT SYSTEM. COLOR AND FINISH TBD.
E6 EXTERIOR WALL SCONCE. FIXTURE TBD.
LEVEL 2
E7 FRAMED CANOPY W/ GFRC CORNICE
+12' - 0" E7
E8 ROOF PARAPET W/ GFRC CORNICE
E4 E9 6" TRIM BOARD
E10 12" TRIM BOARD AND ALUMINUM PARAPET COPING
LEVEL 1
E11 VINYL DOUBLE HUNG WINDOW. COLOR AND TRIM TBD
+0' - 0"
E5 E1
EXTERIOR ELEVATION - WEST
4 1/16" = 1'-0"
T.O. PARAPET E9 E3 E8 E2 E10
+37' - 0"
T.O. ROOF
+32' - 0"
E11
LEVEL 3
+22' - 0"
LEVEL 2
+12' - 0"
E4
LEVEL 1
+0' - 0"
E4 E1 E4
3 EXTERIOR
1/16" = 1'-0"
ELEVATION - NORTH
T.O. PARAPET
E2 E9 E3 E8
+37' - 0"
T.O. ROOF
+32' - 0"
E11
LEVEL 3
+22' - 0"
E2
LEVEL 2
+12' - 0"
E4
LEVEL 1
+0' - 0"
E1 E4 E4 E1
EXTERIOR ELEVATION - EAST
2 1/16" = 1'-0"
T.O. PARAPET E3 E2 E8 E9 E1
+37' - 0"
T.O. ROOF
+32' - 0"
E11
LEVEL 3
+22' - 0"
LEVEL 2
E4
+12' - 0"
LEVEL 1
+0' - 0"
E4 E4 E7 E5 E6 E1
1 EXTERIOR
1/16" = 1'-0"
ELEVATION - SOUTH
Exterior Elevations
Home Leasing - West Seneca
Page 70 of 1493
Page 71
A-3
3
3 BR
UNIT
3 BR W D
UNIT
DEAD END
15' - 1"
W D
STAIR 2
190 SF
UP
3-STORY BLDG - UNIT COUNTS EXISTING MANSION - UNIT COUNTS
1 BR = 15 UNITS 1 BR = 9 UNITS
2 BR = 25 UNITS 2 BR = 4 UNIT
3 BR = 20 UNITS 3 BR = 2 UNITS
W D
MAINT. SHOP EQUIP STOR.
397 SF 332 SF
60 UNITS TOTAL 15 UNITS TOTAL
SITE TOTAL: 75
3 BR
1 BR: 24 UNITS
2 BR: 29 UNITS UNIT
3 BR: 22 UNITS
COMPACTOR
RECYCLING 237 SF
102 SF
COMMUNITY ROOM MECH
848 SF 32 SF
2 A-3
TLT
56 SF
FITNESS
536 SF
TLT
56 SF
ELEV
122 SF
3 BR ELEC / WATER
UNIT D W
2 BR 1 BR 2 BR W D D W
2 BR 1 BR 2 BR W D
DATA
93 SF
722 SF
UNIT UNIT UNIT UNIT UNIT UNIT
A-3 4
JAN. MECH
D W
116 SF 116 SF
19' - 8 3/4" STOR.
DEAD END 49 SF
TLT
MAIL
D W
UP 68 SF
143 SF
OFFICE RECEPTION
167 SF 396 SF
3 BR STAIR 1
LOBBY
356 SF
UNIT 189 SF D W W D D W W D
1 BR 2 BR 2 BR 3 BR 2 BR DATA MECH
CONFERENCE
UNIT UNIT UNIT UNIT UNIT PKGS
203 SF FILES WORK RM
111 SF MECH/ 137 SF
VEST. STOR.
68 SF 38 SF
N
1
A-3
First Floor Plan
Home Leasing - West Seneca
Page 71 of 1493
Page 72
A-3
3
3 BR
UNIT
3 BR W D
UNIT
W D
STAIR 2 DN
190 SF
UP
W D
2 BR
3 BR UNIT
UNIT
TRASH CHUTE /
RECYCLING
120 SF
2 BR
UNIT
2 A-3
D W
1 BR
UNIT
3 BR DATA
1 BR
UNIT D W
2 BR 1 BR 2 BR W D D W
2 BR 1 BR 2 BR W D
93 SF
UNIT
UNIT UNIT UNIT UNIT UNIT UNIT
A-3 4
D W
JAN. MECH
116 SF 116 SF
STAIR 1
D W
D W
189 SF
UP
3 BR DN
3 BR
UNIT D W W D D W W D
UNIT
1 BR 2 BR 2 BR 3 BR 2 BR 1 BR
UNIT UNIT UNIT UNIT UNIT UNIT
N
1
A-3
Second and Third Floor Plans
Home Leasing - West Seneca
Page 72 of 1493
Page 73
3 BR
UNIT
1 BR 2 BR
UNIT UNIT
LAUNDRY
216 SF
1 BR
MAINTENANCE OFFICE
UNIT
235 SF
1 BR 1 BR
UNIT UNIT
3 BR
UNIT
1 BR
UNIT
SECOND FLOOR PLAN
2 1/16" = 1'-0"
2 BR
UNIT
DN UP
UP
1 BR 1 BR
UNIT UNIT
LAUNDRY
184 SF
2 BR
FITNESS 2 BR
UNIT 1 BR UP
309 SF UNIT
UNIT
DN
3 BR DN LOBBY/MAIL
OFFICE
UNIT 257 SF
142 SF
CONCEPTUAL RENDERING CONF. RM
OFFICE
206 SF
311 SF
ENTRY
169 SF
N
FIRST FLOOR PLAN
1 1/16" = 1'-0"
Existing Building Plans and Rendering
Home Leasing - West Seneca
Page 73 of 1493
Page 74
LINE LEGEND SYMBOL LEGEND I-90
CAYUGA CREEK ROAD
SECTION/PARCEL BOUNDARY D DRAINAGE MANHOLE E ELECTRIC MANHOLE
MIN. BUILDING SETBACK EM
CENTER LINE INLET DRAINAGE MANHOLE ELECTRIC METER
EK
A CRE
EXIST. EASEMENT LINE CATCH BASIN T TELEPHONE MANHOLE CAYUG
EXIST. RIGHT-OF-WAY LINE
EXIST. EDGE OF PAVEMENT
END SECTION TP TELEPHONE PEDESTAL
WV H
END OF PIPE PROJECT
D
Y
EXISTING WATER MAIN, VALVE, & HYDRANT.
1720'±
W PEDESTRIAN POLE
EXISTING SANITARY SEWER, & MANHOLE.
S MANHOLE TRAF.
LOCATION
HARLEM ROAD
MH
EXISTING DRAINAGE SEWER, FIELD INLET, SIG. TRAFFIC CONTROL CABINET
D CAB.
INLET MANHOLE, MANHOLE, & END SECTION. S SANITARY MANHOLE FRENCH ROAD
8 LAMP POST
57 57 OH OH EXISTING OVERHEAD UTILITIES
8 C.O. CLEAN OUT
LIGHT POLE
T T EXISTING TELEPHONE GV
GAS VALVE UTILITY POLE WITH LIGHT
UG UG EXISTING UNDERGROUND UTILITIES
GS
UNION ROAD
579 583
C
G G EXISTING GAS GAS SERVICE FLAG
LI
580 5
81 FLAG POLE
N
GM POLE
TO
E E EXISTING ELECTRIC
582 583 GAS METER
N
584 MAILBOX
ST
585
EXISTING GUARD RAIL SV
R
MB
BU
586
M
583
EE
58 SPRINKLER VALVE
IN
585 0
T
BOLLARD
FF
582 587 TREE,HEDGE,EDGE OF WOODS
ER
AL
SH
AL
581
SPRINKLER HEAD
O
8 POST
SP
580
57 EXISTING SWALE
CR
RI
WV
NG
EE
5 88 X , , BARBED WIRE,STOCKADE,CHAIN LINKED FENCE WATER VALVE
SIGN
S
K
RO
58 WS
5 410 EXISTING CONTOUR
AD
' WATER SERVICE
589
" E 71.00 590
x 420.4 EXISTING SPOT ELEVATION @ X
SIGN
9
2159'1 1
HYDRANT
SIGN
N76°
TO
592 CONCRETE PAD/ CONCRETE SIDEWALK
P
WM
OF
WATER METER
580
TURNING ARROW INDIAN CHURCH ROAD
BA
7
NK
58
WELL
HANDICAP
CA
9 '
BORE
.3 STOP BAR
5
STOP
YU
58
9
16 C CABLE TV PEDESTAL TREE DECIDUOUS
S3
LOCATION SKETCH
GA
"E
2°
SIGNAL POLE TREE CONIFEROUS
41
14
NOT TO SCALE
5'
CR
5 BUSH
'
UTILITY POLE
12
°
EE
45
"E
GUY WIRE AC AIR CONDITIONING UNIT
N
K
N SAN
20
PULL BOX SANITARY UTILITY LATH
6
6.2
58
593 ELECTRIC PULL BOX G GAS UTILITY LATH
2'
5 ELEC.
58
RIM=593.19
(NO ACCESS)
S
TELEPHONE PULL BOX
W WATER UTILITY LATH
UTILITY INFORMATION
TELE. T TELEPHONE UTILITY LATH
58
5
TR TRAFFIC PULL BOX UTILITY INFORMATION PER UFPO DESIGN TICKET # 10313-000-071-00
594 E ELECTRIC UTILITY LATH
GRID
57 DATED OCTOBER 31, 2023
9
T TRANSFORMER C CABLE UTILITY LATH
595 1. BUCKEYE PIPELINE COMPANY 610-904-4475
586
N00° 32' 17"E 174.62'
2
59
2. CHARTER COM NORTHEAST WESTERN NY 317-575-7800 x2
RIM=594.92
(NO ACCESS)
593 3. ERIE COUNTY DIVISION OF SEWER MANAGEMENT 716-858-8760
587
57
8
S
S4
4. ERIE COUNTY WATER AUTHORITY 716-685-8207
3°
42
BO
5. NATIONAL FUEL GAS | BUFFALO - NFG101 716-857-7431
6
'1
59 TT
OM
594
7"
OF 6. NYS THRUWAY AUTHORITY | BUFFALO 716-635-6224
BA
E
GATE NK
17
7. NYSEG LANCASTER ELECTRIC 585-484-5115
8.
00
8. TOWN OF CHEEKTOWAGA 716-686-3450
'
7
59
579
BO 9. TOWN OF WEST SENECA HIGHWAY 716-674-5600 x261
T TO
M
OF
57 BA 10. VERIZON | BUFFALO 315-937-2515
8 N
8 59 K
587
CE
S5 58
0 NT
ER
9° LIN
95
2 9' 58
5
E
OF
'±
CR
5
13 E
"E EK
74
59
'
0
580
585
59 .72
599
58
11
59
139 0
6
5
59
7.8
4
TO
596 59
7 PO
FB 5'
AN
599
58 40 K
.8'
.7'
6 8
E
59
20
38"
FE
NC
599 ONE STORY 6.9 E
' 1" PIN
600 FRAME GARAGE
31'
APPROXIMATE LOCATION 0.4' ABOVE
FF=599.29'
EASEMENT TO ERIE COUNTY GRADE
°
SEWER DISTRICT #4
N22
PER REF. 4 TWO STORY
0
FRAME BARN 60
FF=600.25'
59
7"
.8'
.4'
30
13"
6
58
20" 600
N CE
ONE STORY
FE
FRAME BUILDING
7
IC
58
E
FF=600.15'
T
599
NC
AS
6" PVC
FE
PL
S
D
'
D
RIM=602.51
.98
OO
AN
48" 32" 599 (NO ACCESS)
W
C
PV
OD
2
4'
CONCRETE 4"
18
WO
596.80
580
585
E 0
5'
0" 59
STONE / 5
6.9 N/F
CONCRETE 59
CLINTON STREET REALTY
GRILL
'1
14" HOLDINGS
27
5
TG=598.70 T.A.# 124.00-2-5
59
2544 CLINTON STREET
8
6°
57
9
LIBER 11299 PAGE 9093
59
N3
ASPHALT AREA = 9.402 ACRES TO
TIE LINE
AREA = 12.733 ACRES TO
8
59
C.O. 36" 8" CENTERLINE OF CREEK 0
36" 60
ASPHALT
4"
C.O.
18"
6
59
30" 600
8"
8' 32"
T1
1
EK
0
7.
T2
24"
60
LO
11
LO
BA
NK
R E DEAD
8
59
O
F
C " E 59
7 10"
GA
M CONCRETE PAD
O
TT
37 W/ HVAC UNITS 15" STUMP
BO '
Y U 0 32"
7' HIGH
°5
CA
10"
9 TWO STORY
45 NK 59 10" STUMP
EK
K 24" BLOCK/FRAME 7' HIGH
B AN N O F BA BUILDING 600
E
RE
OF P 36" 10"
DOWNSPOUT
LIN WOODS
M TO 32"
TO DOWNSPOUT
FC
T 4"
BO
N60° 14' 10"W 1'
TIE
.4
EO
97 T GM FF=600.70'
69'± FF=602.53'
TO
8" 16"
2"E
LIN
T 30" 34"
' 5 15" 599
16
0'
ER
6
5
°
3.4
59
59
58 597
N/F
NT
K
N
T
EE
8"
73
CLINTON STREET REALTY
4
T 16"
59
593
30"
CR
8 15" HOLDINGS
CE
59
580 36"
OF
T.A.# 124.00-2-8
59
MB 13" 21
NE
6.7 2602 CLINTON STREET
2
'
1.3
O
T '
LI
5 LIBER 11299 PAGE 9093
58
ER
CONCRETE W/
19
FLAG 13" 598
'±T
15"
NT
0 POLE OVERHANG
577 59 48" 15"
CE
7
5 ORIGINAL
80
59 T ASPHALT
N18° 32' 09"E 48"
NORTHERLY RIGHT 21
7
8"
E 4.1
57
OF WAY LINE OF T ET '
VT
WV 49.86' CLINTON STREET NC
R
P
OH
CO 598
CONCRETE WALL TRUCK ROUTE W/ H
75
WV 597
35 MPH
36" MILE MARKER x.
'W
W 354/5301/2009 1.4
'
5.8
S69
59
APPROXIMATE LOCATION
19
T 1
4.0
APPROPRIATION OF LANDS ° 30 3' STONE WALL 10' WIDE EASEMENT TO 4.3 599
T 59
3
FOR HIGHWAY PURPOSES
W ' 45 BOX BEAM NEW YORK STATE
595
LIBER 9006 PAGE 213 "E GUIDE RAIL ELECTRIC & GAS
600 CORPORATION TG=595.23
W 599 598 NYSEG 596
PER REF. 4
"E
494 T
9
60
59
W
303
2
LO 597
50
NO #
LO T 1
60
1
T3
4
.36' 598
'
45
28" 24"
W W
9°
599
24"
N2
600 G 24"
W
GATE
W GATE
OH
FE
NC
6.2 E ONE STORY
6' CHAIN '
WV 3' STONE WALL 1-1/4" FRAME GARAGE
12" LINK FENCE PIPE
2.6 FF=601.19'
OH W
CL W N6 20" '
S60° 14' 10"E
0°
OH IN TO 14 19" 0 88.00'
.7'
'1 60 2.5
.3'
'
15
494/38
NS 0"W
20
G 15"
TR G 20" 22
.5'
WOOD
W
E 601 W
0'
OH GAZEBO
(W ET (
60
18"
D
Y
H
1.0
0
#2561 22"
AP
G IDT N.Y PR
O
3.0
'
13
X
HV .S.
'
IM
0
AT TWO STORY
OH
R
1.0
EL
AR
W I O OC G
FRAME HOUSE
16
.5'
25"
APP G ES) UT AT W
IO
25
FF=605.33'
CONCRETE
13
'
ROX N1
E
9.7
IMA 2" 7.6 1 STEPS 600
T E LO
CAT
OH W
354 AT
ER 2'
60 4.0
'
) N/F
.6'
ION
'
OH
6.6
MA
0"W
4" G
46
AS G IN 3.0 2.0 CLINTON STREET
MAI AP 602 G ' '
N P GM 48" REALTY HOLDINGS
W ROX W WA T.A.# 124.00-2-7
.4'
OH 13"
'5
IM L
AT 1.0 L 22
30
EL ' .5' 2574 CLINTON STREET
45
G OC 28" STUMP LIBER 11299 PAGE 9093
AT
IO
N6 2' HIGH AREA = 0.265 ACRES
.1'
9°
1.8 L
L
NYSEG "W 603
16
WA
'
AT G
S2
40
W ER M
SURVEY NOTES
602
W
AIN 34"
G OH
COVERED
12" 01
STOOP 6 1. TOPOGRAPHY SHOWN FROM A FIELD SURVEY BY COSTICH ENGINEERING
ON 12/8/2023 HORIZONTAL AND VERTICAL DATA OBTAINED THROUGH
G
604
MB G6
0 3
N60° 14' 10"W NYSDOT CORS NETWORK REFERENCED TO THE FOLLOWING MONUMENT
W W
G
AP
PR
88.00'
OX
G IM HAMBURG CORS STATION
AT
EL -LATITUDE: 42-43-02.66326 (N) NAD 83 (CORS)
OC
AT -LONGITUDE: 078-50-47.27326 (W)
G IO
W W N2
"G
AS
-ELLIP HEIGHT: 212.494 METERS NAVD 88 (CORS)
MA
IN
G
W W
W W
SITE DATA CERTIFICATION
REFERENCES
1. EXISTING ZONING: M-1 (MANUFACTURING DISTRICT) WE, COSTICH ENGINEERING, D.P.C., HEREBY CERTIFY T0:
1. DEEDS AS SHOWN ON FILE AT THE ERIE COUNTY CLERK'S OFFICE.
2. BULK REQUIREMENTS:
2. MAP OF THE EBENEZER LANDS FILED IN THE ERIE COUNTY CLERK'S
REQUIRED
OFFICE UNDER COVER NO. 58.
MIN. LOT AREA (SF) 20.,000
3. NEW YORK STATE DEPARTMENT OF TRANSPORTATION ACQUISITION MAP,
MAX LOT COVERAGE N/A
CLINTON STREET, PART I, S.H. NO. 371, ERIE COUNTY, MAP NO. 44, PARCEL
NO. 37., FILED AT LIBER 9006 OF DEEDS, PAGE 213.
MIN. LOT WIDTH (FT) 100
4. MAP ENTITLED "BOUNDARY SURVEY OF 2544 CLINTON STREET",
FLOOD NOTE: MAX. BUILDING HEIGHT (FT) 40 THIS MAP WAS PREPARED FROM NOTES OF AN INSTRUMENT SURVEY COMPLETED ON
PREPARED BY NUSSBAUMER & CLARKE, INC., HAVING JOB NO 15J2-0079,
By graphic plotting only, this property is in Zone X & Zone AE of the Flood DRAWING NO. SB-2535, DATED 2/4/2015. DECEMBER 8, 2023 AND FROM THE REFERENCE(S) LISTED HEREON. NO SEARCH OF
MIN. FRONT YARD SETBACK (FT) 50 RECORDS, OTHER THAN THOSE REFERENCED, WAS MADE FOR EASEMENTS OR
Insurance Rate Map No. 36029C0331H Community Panel No. 360262, Town of
West Seneca, which bears an effective date of 6/7/2019 and Zone X & Zone AE 5. MAP ENTITLED "BOUNDARY SURVEY OF 2602 CLINTON STREET", ENCUMBRANCES AFFECTING THIS PARCEL.
MIN. SIDE YARD SETBACK (FT) 50
of the Flood Insurance Rate Map No. 36029C0332H Community Panel No. PREPARED BY NUSSBAUMER & CLARKE, INC., HAVING JOB NO 15J2-0080,
360262, Town of West Seneca, which bears an effective date of 6/7/2019, No DRAWING NO. SB-2534, DATED 2/4/2015.
field surveying was performed to determine this zone and an elevation certificate
may be needed to verify this determination or apply for a variance from the Federal
MIN. REAR YARD SETBACK (FT) 10
By:
PRELIMINARY Date:
Emergency Management Agency.
Daniel T. Hickok, N.Y.S. L.S., No. 050449
PROJECT MANAGER TITLE OF PROJECT
EXISTING UTILITIES (LOCATION, SIZES AND INVERTS) SHOWN ON THE
PLANS ARE APPROXIMATE AND ARE NOT CERTIFIED AS TO THE
COPYRIGHT © 2023
OF NEW
D.T.H. Civil 2544 & 2574 CLINTON STREET PROPERTIES
COSTICH ENGINEERING, D.P.C. Y
TE WEST SENECA
ACCURACY OF THEIR LOCATION OR COMPLETENESS. THE DRAWN BY
GRAPHIC SCALE L T. H I Engineering
O OK
CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT IE K.E.L.
A
TITLE OF DRAWING
RK
C
ST
N
K
LOCATIONS AND DEPTHS OF ALL UTILITIES AND STRUCTURES IN THE IT IS A VIOLATION OF LAW FOR ANY Land EXISTING FEATURES
DA
50 0 25 50 100 200 BOUNDARY
PERSON, UNLESS ACTING UNDER THE
PATH OF, OR CLOSELY PARALLEL TO, OR UNDER, THE PROPOSED DIRECTION OF A LICENSED PROFESSIONAL G.M.S. Surveying
CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ENGINEER, LAND SURVEYOR, ARCHITECT
OR LANDSCAPE ARCHITECT, TO ALTER ANY TOPO/BASE LOCATION OF PROJECT TAX PARCEL NO.'S 124.00-2-5 & 124.00-2-7
DELAYS OR DAMAGES OCCURRING AS A RESULT OF INCORRECTLY Landscape
ITEM ON THIS DOCUMENT IN ANY WAY . M.G. PART OF LOTS 1,2, & 34 OF THE EBENEZER LANDS,
LOCATED UTILITIES. IT IS THE CONTRACTORS RESPONSIBILITY TO
R
ANY LICENSEE WHO ALTERS THIS Architecture LOT 123, TOWNSHIP 10, RANGE 7, BUFFALO CREEK RESERVATION,
LI C
NOTIFY THE VARIOUS UTILITY OWNERS IN AMPLE TIME FOR THEM TO ( IN FEET ) L.
YO
DOCUMENT IS REQUIRED BY LAW TO AFFIX S. DATE TOWN OF WEST SENECA, COUNTY OF ERIE, STATE OF NEW YORK
9
4
1 inch = 50 ft. NO. 0 5 0 4
EN
LOCATE AND MARK THEIR FACILITIES. THE CONTRACTOR SHALL ALSO HIS/HER SEAL AND THE NOTATION 12/18/2023
E
"ALTERED BY", FOLLOWED BY HIS/HER S V Costich CLIENT
LABELLA ASSOCIATES DWG. # 9263
NOTIFY UNDERGROUND UTILITY LOCATION SERVICE AT LEAST 48 ED R 217 Lake Avenue
SU
HOURS IN ADVANCE OF COMMENCING ANY WORK.
NO. DATE REVISION BY CHKD. APVLS.
SIGNATURE AND SPECIFIC DESCRIPTION OF
THE ALTERATION, TO THE DOCUMENT. L AND SCALE
1"=50' Engineering
Rochester, NY 14608
(585) 458-3020
300 STATE STREET - SUITE 201
ROCHESTER, NEW YORK 14614
VA100
SHEET 1 OF 1
Page 74 of 1493
Page 75
Prepared For:
Home Leasing, LLC
75 South Clinton Avenue, Suite 700
Rochester, NY 14604
Submitted by:
LaBella Associates
300 State Street, Suite 201
Rochester, NY 14614
(716) 551-6281
ENGINEERING REPORT FOR WEST SENECA
Date: October 2024
Last Revised: April 2026
LBA Project No. 2241067
Page 75 of 1493
Page 76
West Seneca Sewer Report | Page 1
Table of Contents
Section 1 – Introduction .................................................................................................................... 2
Section 2 – General.............................................................................................................................. 2
Section 3 – Proposed Sanitary Facilities .............................................................................. 2
Section 4 – Propsoed Stormwater Facilities ..................................................................... 6
Section 5 – Proposed Water Facilities ................................................................................... 9
Appendices
Attachment A – Site Location Map
Page 76 of 1493
Page 77
West Seneca Sewer Report | Page 2
Section 1 – Introduction
Home Leasing is proposing the development of a new affordable housing complex on a +/-
12.7-acre parcel in West Seneca, NY. Home Leasing is also seeking Site Plan Approval from
West Seneca and HCR 9% funding from New York State. The proposed development
includes 75 units split between a repurposing of the existing mansion on site to and a new 3-
story apartment building in the rear of the property. The project includes a private road
accessing the apartments, parking, sidewalks, playground, landscaping and stormwater
management facilities.
1.1 Site Location
The 12.7-acre site is nestled between Clinton Street (State Route 354) to the south and Cayuga
Creek to the North and West. Within a quarter mile of the development there are multiple
commercial uses and Interstate 90. The neighborhood is predominately comprised of
agricultural land, single- and two-family homes and industrial/manufacturing facilities. See
appendix A for location site map.
Section 2 – General
2.1 Existing Site Conditions
The existing site includes the above-mentioned mansion, two barns, a stone wall along
Clinton Street and parking areas. The barns and parking areas will be demolished, while the
existing stone wall will remain, with the entrance being widened to allow for emergency
vehicle access to the site.
The site topography is relatively flat with elevations generally ranging from 600 to 580. Storm
water runoff from site drains either via sheet flow directly to Cayuga Street, or to drainage
inlets that drain to Cayuga Creek. The existing drainage system on site is minimal and consists
of a small swale and dry detention basis which collects and re-directs off-site drainage from
the east. Drainage is then conveyed to Cayuga Creek via storm pipes and open drainage
swales.
2.2 Proposed Site Conditions
The proposed development includes 75 units split between a repurposing of the existing
mansion on site to now include apartments and one apartment building in the rear of the
property.
Project Data:
Facility Type: Affordable Housing
No. of Buildings: 2 (Including one existing)
Section 3 – Proposed Sanitary Facilities
3.1 Building Utility Services – Sanitary
The following summarizes the sanitary sewer service sizes for each building.
Page 77 of 1493
Page 78
West Seneca Sewer Report | Page 3
Table 1: Sanitary Lateral Sizes
Sanitary Lateral
Building # Description
Size
1 Existing Mansion 6”
2 Proposed Building 6”
3.2 Sanitary Sewer
The project requires a Down Stream Sewer Capacity analysis (DSCA) to conform with
NYSDEC regulations considering proposed sanitary flows are intended to convey a flow
greater than 2,500 gallons per day.
In accordance with Erie County policy a downstream, dry weather sanitary capacity analysis
is included. The monitoring report is included in the appendices.
Based on the flow depth measurements recorded the following conclusions are reached:
• At no time did the flow depth exceed pipe diameter at any of the downstream
monitoring points during the wet weather events monitored.
• One time during the monitoring period the depth of flow exceeded the diameter of
the pipe.
3.3 DSCA Summary
Erie County provided three (3) nodes, described below:
• Flow Monitoring Period: August 13, 2024, to September 18, 2024
• Dry Week Days Monitored: Aug 13-15, Aug 20-23, Aug 26-30, Sept 2-5, Sept 10-13,
and Sept 16-18.
• Dry Weekend Days Monitored: Aug 24-25, Sept 8, and Sept 14-15.
Nodes (manholes):
• Node 1 MH BAA8A – 48” RCP (Matthews Cemetery NW Corner)
• Node 2 MH BAA9A – 60” RCP (Casimer Street)
• Node 3 MH BAAA8 – 66” RCP (8 Cable Street)
Design Parameters:
Hydraulic Loading rates per NYS Design Standards for Intermediate Wastewater Treatment
Systems, March 5, 2014. Calculations included below:
Apartments – Bedroom Units = 110 gpd/unit
Office Space= 15 gpd / employee
Average Daily Design Flow:
One Bdrm Units:(24 units) x (1 bdrm/unit)x 110gpd/bdrm=2,640 gpd
Two Bdrm Units:(29 units) x (2 bdrm/unit)x110gpd/bdrm=6,380 gpd
Page 78 of 1493
Page 79
West Seneca Sewer Report | Page 4
Three Bdrm Units:(22 units) x (3 bdrm/unit)x110gpd/bdrm=7,260 gpd
Office Space: 4 Employees x 15 gpd = 60 gpd
Total = 16,340 gpd
Peak Hourly Flow (Sanitary): 16,340 gpd x Peak Factor
Total Population=[(24x1)+(29x2)+(22x3)]x2 people per bedroom=
=148x2= 296People (assume 2 people per bedroom)+4 office employees=300. P = 0.300 (in
thousands)
Peaking Factor = (18 + √P) / (4+√P) = (18+0.548)/(4+0.548)=4.08
Peak Sanitary Demand =16,340x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Sanitary Demand Calculations:
Node 1 – Average 16,340 gpd (0.016 MGD)
Entire Site:
110-gal/d/unit x 1bdrmx24 units=2,640 gpd
+ 110-gal/d/unit x 2bdrmx29 units=6,380 gpd
+110-gal/d/unitx3bdrmx22 units=7,260 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,340 gpd
Ave. Total = 16,340 gpd (0.016 MGD)
Assume 2 people per bedroom. 2 x 148 bedrooms = 296 people + 4 office employees = 300
people. P = 0.300 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,340 x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Node 2 – Average 16,340 gpd (0.016 MGD)
Entire Site:
110-gal/d/unit x 1bdrmx24 units=2,640 gpd
+ 110-gal/d/unit x 2bdrmx29 units=6,380 gpd
+110-gal/d/unitx3bdrmx22 units=7,260 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,340 gpd
Ave. Total = 16,340 gpd (0.016 MGD)
Assume 2 people per bedroom. 2 x 148 bedrooms = 296 people + 4 office employees = 300
people. P = 0.300 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,340 x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Node 3 – Average 16,340 gpd (0.016 MGD)
Page 79 of 1493
Page 80
West Seneca Sewer Report | Page 5
Entire Site:
110-gal/d/unit x 1bdrmx24 units=2,640 gpd
+ 110-gal/d/unit x 2bdrmx29 units=6,380 gpd
+110-gal/d/unitx3bdrmx22 units=7,260 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,340 gpd
Ave. Total = 16,340 gpd (0.017 MGD)
Assume 2 people per bedroom. 2 x 148 bedrooms = 296 people + 4 office employees = 300
people. P = 0.300 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,340 x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Table 2: Dry Weather Peak Weekday
Proposed
Total
Existing Peak Theoretical
Ave. Daily Peak Available Capacity
Node Sewer Peak Flow Sanitary Capacity
Flow (mgd) Flow (Y/N)
(mgd) Flow (mgd)
(mgd)
(mgd)
1-MH 48” RCP @ 0.41%
BAA8A (Matthews
0.016 7.953* 0.067 8.020 59.6 Y
Cemetery NW
Corner)
2-MH 60” RCP @ 0.042%
0.016 11.619** 0.067 11.686 34.6 Y
BAA9A (Casimer Street)
3-MH 66” RCP @ 0.026%
BAAA8 0.016 10.614*** 0.067 10.614 35.1 Y
(8 Cable Street)
Notes:
*Peak Dry Week Day for Nodes 1 on Aug 27,2024
**Peak Dry Week Day for Node 2 on Aug 21,2024
***Peak Dry Week Day for Node 3 on Aug 21,2024
Table 3: Dry Weather Peak Weekend Day
Proposed
Total
Ave. Daily Existing Peak Theoretical
Peak Available Capacity
Node Sewer Flow Peak Flow Sanitary Capacity
Flow (Y/N)
(mgd) (mgd) Flow (mgd)
(mgd)
(mgd)
1-MH 48” RCP @ 0.41%
BAA8A (Matthews
0.016 6.070* 0.067 6.137 59.6 Y
Cemetery NW
Corner)
Page 80 of 1493
Page 81
West Seneca Sewer Report | Page 6
2-MH 60” RCP @ 0.042%
BAA9A 0.016 11.972** 0.067 12.039 34.6 Y
(Casimer Street)
3-MH 66” RCP @ 0.026%
BAAA8 0.016 11.615*** 0.067 11.682 35.1 Y
(8 Cable Street)
Notes:
*Peak Dry Weekend Day for Nodes 1 on Aug 25,2024
**Peak Dry Weekend Day for Node 2 on Sept 14,2024
***Peak Dry Weekend Day for Node 3 on Sept 14,2024
3.5 DSCA CONCLUSION
Based on the analysis and flow monitoring results the flow depth peak increases are
described below. The combined sewer has sufficient capacity to handle projected peak
flows.
• Node 1 projected peak 0.067 MGD flow (0.10 CFS) result in approximately a 1.6 inch
water level increase within the 48” RCP sewer.
• Node 2 projected peak 0.067 MGD flow (0.10 CFS) result in approximately 2.6 inch
water level increase within the 60” RCP sewer.
• Node 3 projected peak 0.067 MGD flow (0.10 CFS) result in approximately 2.9 inch
water level increase within the 66” RCP sewer.
Full sewer calculations including – TECsmith Flow Monitoring Data, TECsmith Time Tables,
Eire County Flow Monitoring and Erie County Time Tables are included in the Full Sewer
Report which was previously provided to the town as a part of the Special Use Permit review
process.
Section 4 – Proposed Stormwater Facilities
4.1 Proposed Stormwater Loading
A Stormwater Pollution Prevention Plan (SWPPP) has been developed as part of this project
and is included under a separate cover. The proposed on-site storm system will outlet to
Cayuga Creek. The stormwater design meets the Town of West Seneca Town Code (2025-
09-08) - Chapter 102A Stormwater Management and Erosion and Sediment Control and the
NYSDEC 2024 Stormwater Design Manual Regulations. However, pertinent information
pertaining to existing and proposed stormwater loading has been included for analysis in the
table below.
4.2 Required WQv
Stormwater runoff from impervious surfaces is recognized as a significant contributor of
pollution that can adversely affect the quality of receiving water bodies. Therefore, treatment
of stormwater runoff is important since most runoff related water quality contaminants are
Page 81 of 1493
Page 82
West Seneca Sewer Report | Page 7
transported from land, particularly the impervious surfaces, during the initial stages of storm
events.
The Design Manual requires that water quality treatment be provided for the initial flush of
runoff from every storm. The NYSDEC refers to the amount of runoff to be treated as the
“Water Quality Volume” (WQv). Section 4.2 of the Design Manual defines the Water Quality
Volume as follows:
WQv = [(P )(R V )(A )]
12
Where: P = 90% Rainfall Event Number
Rv = 0.05 + 0.009 (I)
I = Impervious Cover (Percent)
A = Contributing Area in Acres
This definition ensures that, all other things being equal, the Water Quality Volume will
increase along with the impervious cover percentage. This redevelopment project is
proposing a combination of WQv treatment by standard practice(s) and alternative practice(s)
as shown in the following tables:
Table 4: Required WQv Summary
P (inches) A (Ac) I (Ac) Rv WQv Required (cf)
1.00 5.68 2.98 0.29 8,672
4.3 RRv Requirements
Land use change and development in the watershed increases the volume of runoff. As such,
reductions in the amount of runoff from new development, accomplished through the
implementation of a stormwater management plan for the site, will play an important role in
the success or failure of the watershed-wide stormwater management plan. Runoff reduction
techniques can be applied to manage, reduce, and treat stormwater, while maintaining and
restoring natural hydrology through infiltration, evapo-transpiration, and the capture and
reuse of stormwater. Volume reduction techniques by themselves typically are not sufficient
to provide adequate attenuation of stormwater runoff, but they can decrease the size of the
peak runoff rate reduction facilities.
Section 9.2.1.B of the 2024 NYSDEC Design Manual indicates, “Although encouraged, meeting
the RRv criteria is not required for the redevelopment activity portion of a project. The need
to provide RRv shall be considered separately for each design point. For design points with a
net increase in impervious area, RRv is required for the increase in impervious area only.”
As such, bioretentions and a water quality unit have been applied to the project to meet the
WQv objective for the redevelopment activity of the project. The increase in impervious cover
will be treated as new development and both the WQv criteria and RRv criteria are met. The
table below indicates the required RRv for the site.
Page 82 of 1493
Page 83
West Seneca Sewer Report | Page 8
Table 5: Required RRv
Total Minimum
Soil Soil Soil Soil
Increase in Weighted RRv
Group A Group B Group C Group D Rv
Impervious S Factor Required
(%) (%) (%) (%)
Area (Ac) (cf)
1.92 0 0 0 100 0.95 0.20 1,324
4.4 Provided WQv and RRv
The following table summarizes both the water quality volume and reduced runoff volume
provided by each practice:
Stormwater Practice WQv Treated (cf) RRv Provided (cf)
Bioretention (3 total areas) 3,338 1,337
Water Quality Unit 6,627 0
Total 9,965 1,337
Based on the above table, the WQv and RRv requirements are being met.
4.5 Discharge Rates
A comparison of the pre- and post-development watershed conditions was performed for all
Design Points and storm events evaluated. For all Design Points and design storms, this
comparison demonstrates that the peak rate of runoff will not be increased. Therefore, the
project will not have a significant adverse impact on the adjacent or downstream properties
or receiving water courses.
The results of the computer modeling used to analyze the pre- and post-development
watersheds are presented in the following table below:
Table 6: Summary of Pre-Development and Post-Development Peak Discharge Rates
10-year 24-hour storm event 100-year 24-hour storm event
Analysis Point
(AP)
Pre Post Pre Post
1 16.3 13.9 36.8 31.7
Based on the table above, the proposed stormwater flows have been reduced for all storm
events to below pre-development conditions.
A full stormwater pollution prevention plan per NYS Stormwater Design Manual, NYSDEC
SPDES General Permit for Stormwater Discharge from Construction Activity and NYSDEC
Page 83 of 1493
Page 84
West Seneca Sewer Report | Page 9
Standards and Specifications for Erosion and Sediment Control has been prepared for this
project. The SWPPP is included in the Site Plan Application Package.
Section 5 – Proposed Water Facilities
5.1 Proposed Water Connections
The project is proposing a new water connection to the Eire County Water Authority (EWCA)
12” water main on the north side of Clinton Street.
5.2 Existing Flow Test Data
Existing hydrant flow test data was provided for hydrant J11F55 and completed on 7/15/2019.
The existing water line is a 6” cast iron pipe on the south side of Clinton Street. The residual
pressure was 54 psi at 872 gpm.
5.3 Proposed Water Demand
The anticipated average daily water demand from the proposed development was
calculated using Table B-3 of the NYSDEC Design Standards for Intermediate Sized
Wastewater Treatment Systems, dated March 5, 2014. For apartments constructed after
1994, the average daily water demand per bedroom is 110-gallons per day. The proposed
project includes updating all water fixtures to modern energy efficient fixtures. Based on
this, the anticipated average daily water demand for the proposed development is as
follows:
Table 7: Anticipated Water Demand
Average Daily Demand
No. of Bedrooms No. of Units Water Demand Per Unit (GPD)
(GPD)
1 Bedroom 24 110 2,640
2 Bedroom 29 220 6,380
3 Bedroom 22 330 7,260
Total Average Daily Demand 16,340
Maximum Day (2x Average Daily) 32,680
Peak Hourly (4x Average Daily) 35,360
5.4 Proposed Fire Protection and Backflow
The project is proposing one combined service from Clinton Street, which will split into
combined services feeding the existing mansion and new building respectively. New
backflow prevention devices are proposed for each of the buildings, splitting into separate
domestic and fire services after the backflows. The domestic services will be metered within
each building. The private hydrants on site will be fed after the backflow within each building.
Refer to the MEP and FP plans for detailed design.
Page 84 of 1493
Page 85
Stormwater Pollution Prevention Plan
Prepared for:
Home Leasing
75 South Clinton Avenue, Suite 700,
Rochester, NY 14604
Submitted by:
LaBella Associates
300 Pearl Street, Suite 130
Buffalo, NY 14202
(716) 551-6281
West Seneca Apartments
Town of West Seneca, Erie County, New York
Date: April 2026
Last revised: April 2026
Project No. 2241067
Page 85 of 1493
Page 86
Page 86 of 1493
Page 87
PREPARER OF THE SWPPP
“I certify under penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.”
Name and Title1: Kristopher Winkler, PE
Date: Issued: April 2026
1 This is a signature of a New York State licensed Professional Engineer employed by LaBella Associates that is duly
authorized to sign and seal Stormwater Pollution Prevention Plans (SWPPPs), NOIs, and NOTs prepared under their direct
supervision. Refer to Appendix B for the SWPPP Preparer Certification Form, and Appendix I for the LaBella Certifying
Professionals Letter.
Page 87 of 1493
Page 88
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY .................................................................................................................... 1
1.1 Project Description ................................................................................................................... 1
1.2 Stormwater Pollution Controls................................................................................................. 2
2.0 SITE CHARACTERISTICS .................................................................................................................. 3
2.1 State Environmental Quality Review ....................................................................................... 3
2.2 Land Use and Topography ....................................................................................................... 3
2.3 Soils and Groundwater............................................................................................................. 3
2.4 Watershed Designation ........................................................................................................... 4
2.5 Receiving Water Bodies ........................................................................................................... 4
2.6 Aquifer Designation .................................................................................................................. 4
2.7 Wetlands ................................................................................................................................... 4
2.8 Flood Plains .............................................................................................................................. 4
2.9 Listed, Endangered, or Threatened Species .......................................................................... 5
2.10 Historic Places ........................................................................................................................ 5
2.11 Rainfall Data........................................................................................................................... 5
2.12 Pre-development Watershed Conditions .............................................................................. 5
2.13 Post-development Watershed Conditions ............................................................................ 6
2.14 Description of Design Points ................................................................................................. 6
3.0 STORMWATER MANAGEMENT PLANNING .................................................................................... 6
3.1 STEP 1 – Site Planning ............................................................................................................ 7
3.2 STEP 2 – Calculate Water Quality Treatment Volume (WQv) ................................................ 7
3.3 STEP 3 – Apply RR Techniques and Standard SMPs with RRv Capacity to Reduce
Total WQv......................................................................................................................................... 8
3.4 STEP 4 – Calculate the Minimum RRv Required.................................................................... 9
3.5 STEP 5 – Apply Standard SMPs to Address Remaining Water Quality Volume .................... 9
3.6 STEP 6 - Apply Volume and Peak Rate Control .................................................................... 11
3.7 Climate Change Consideration .............................................................................................. 13
4.0 CONSTRUCTION SEQUENCE ......................................................................................................... 14
5.0 CONSTRUCTION-PHASE POLLUTION CONTROL ........................................................................... 14
5.1 Temporary Erosion and Sediment Control Measures .......................................................... 15
5.2 Permanent Erosion and Sediment Control Measures ......................................................... 17
5.3 Implementation Schedule for Erosion and Sediment Control Measures ........................... 17
Page 88 of 1493
Page 89
5.4 Other Pollutant Controls......................................................................................................... 18
5.5 Construction Housekeeping Practices .................................................................................. 21
6.0 INSPECTIONS, MAINTENANCE, AND REPORTING ....................................................................... 22
6.1 Inspection and Maintenance Requirements ........................................................................ 22
6.2 Reporting Requirements ........................................................................................................ 24
7.0 SWPPP IMPLEMENTATION RESPONSIBILITIES ........................................................................... 26
7.1 Owner’s/Operator's Responsibilities..................................................................................... 26
7.2 Owner’s/Operator’s Engineer’s Responsibilities.................................................................. 29
7.3 Contractor's Responsibilities ................................................................................................. 30
7.4 Qualified Inspector’s/Qualified Professional’s Responsibilities ......................................... 31
7.5 SWPPP Participants ............................................................................................................... 33
LIST OF TABLES
Table 1: USDA Soil Data .............................................................................................................................. 3
Table 2: Project Site HSG Data ................................................................................................................... 3
Table 3: Rainfall Data .................................................................................................................................. 5
Table 4: Required WQv Treatment by Alternative Practice ....................................................................... 8
Table 5: WQv Required Summary ............................................................................................................... 8
Table 6: Summary of Standard SMPs with RRv Capacity being Applied .................................................. 9
Table 7: RRv Summary ................................................................................................................................ 9
Table 8: Summary of WQv Provided ......................................................................................................... 10
Table 9: Summary of Hydrodynamic Unit(s) ............................................................................................. 11
Table 10: Design Events ............................................................................................................................ 13
Table 11: CPv Summary ............................................................................................................................ 13
Table 12: Summary of Pre- and Post-Development Peak Discharge Rates ........................................... 13
Table 13: Implementation Schedule for Erosion and Sediment Control Measures .............................. 18
Table 14: Common Construction Pollutants ............................................................................................ 20
Page 89 of 1493
Page 90
APPENDICES
Appendix A: Figures
• A-1: Site Location Map
• A-2: Soils Map
• A-3: Historic Places Screening Map
• A-4: Environmental Resource Map
• A-5: FEMA Firm Map
• A-6: Pre-Development Watershed Delineation Map (Pocket)
• A-7: Post-Development Watershed Delineation Map (Pocket)
Appendix B: Forms
• Notice of Intent (NOI)
• MS4 SWPPP Acceptance Form
• SWPPP Preparer Certification Form
• Owner/Operator Certification Form
• Contractor and Subcontractor Certification Forms
• Notice of Termination (NOT)
Appendix C: Project Evaluation and Design Calculations
Appendix D: Pre-Development Stormwater Modeling
Appendix E: Post-Development Stormwater Modeling
Appendix F: SWPPP Inspection Report (Sample Form)
Appendix G: Post-Construction Inspections and Maintenance
Appendix H: NYSDEC “Deep-Ripping and Decompaction,” April 2008
Appendix I: LaBella Certifying Professionals Letter
Appendix J: NYSDEC SPDES General Permit GP-0-25-001
Page 90 of 1493
Page 91
1.0 EXECUTIVE SUMMARY
This Stormwater Pollution Prevention Plan (SWPPP) has been prepared for major activities associated
with construction of a 75-unit affordable housing complex and related site work in the Town of West
Seneca. This SWPPP includes the elements necessary to comply with the national baseline general
permit for construction activities enacted by the U.S. Environmental Protection Agency (EPA) under the
National Pollutant Discharge Elimination System (NPDES) program and all local governing agency
requirements. This SWPPP must be executed, and permit coverage must be obtained prior to the
commencement of construction activity.
This SWPPP has been developed in accordance with the “New York State Department of Environmental
Conservation (NYSDEC) State Pollutant Discharge Elimination System (SPDES) General Permit for
Stormwater Discharges from Construction Activity,” Permit No. GP-0-25-001, effective January 29,
2025 through January 28, 2030. The SWPPP and accompanying plans identify and detail stormwater
management, pollution prevention, and erosion and sediment control measures necessary during and
following completion of construction.
This SWPPP and the accompanying plans entitled “West Seneca Apartments” have been submitted as
a set. These engineering drawings are considered an integral part of this SWPPP. Therefore, this
SWPPP is not considered complete without them. References made herein to “the plans” or to a
specific “sheet” refer to these drawings.
This report considers the impacts associated with the intended development with the purpose of:
1. Maintaining existing drainage patterns as much as possible while continuing the conveyance
of upland watershed runoff;
2. Controlling increases in the rate of stormwater runoff resulting from the proposed development
so as not to adversely alter downstream conditions; and
3. Mitigating potential stormwater quality impacts and preventing soil erosion and sedimentation
resulting from stormwater runoff generated both during and after construction.
The analysis and design completed and documented in this report is intended to be part of the
application made for a multi-family residential redevelopment project with an increase in impervious
area completed on behalf of the Owner/Operator.
1.1 Project Description
Home Leasing is proposing redevelopment project with an increase in impervious area, to include: 75-
unit affordable housing building, associated parking, sidewalks, and landscaping. The total project
area of disturbance proposed is 5.7 acres. The project will disturb one (1) or more acres and as
such, preparation of this SWPPP is required under GP-0-25-001. A Site Location Map has been
provided in Appendix A, as Figure A-1.
This type of project is included in Table 2 of Appendix B of GP-0-25-001; and the project site is not
located in one of the watersheds listed in Appendix C of GP-0-25-001. Therefore, this SWPPP includes
post-construction stormwater management practices, as well as erosion and sediment controls.
project is located within the Town Of West Seneca regulated, traditional land use control Municipal
Separate Stormwater Sewer System (MS4). Therefore, an MS4 SWPPP Acceptance Form is required
to accompany NOIs submitted to the NYSDEC.
Stormwater Pollution Prevention Plan
Page 1
2241067
Page 91 of 1493
Page 92
Runoff from the project site will discharge to the Cayuga Creek, which is not included in the list of
Section 303(d) water bodies included in Appendix D of GP-0-25-001.
Project construction activities will consist primarily of site grading, paving, building construction, and
the installation of storm drainage, water supply, sanitary sewer, and public utility infrastructure
necessary to support the proposed redevelopment project with an increase in impervious area.
Construction phase pollutant sources anticipated at the site are disturbed (exposed) soil, vehicle fuels
and lubricants, chemicals associated with building construction, and building materials. Without
adequate control there is the potential for each type of pollutant to be transported by stormwater.
1.2 Stormwater Pollution Controls
The stormwater pollution controls outlined herein have been designed and evaluated in accordance
with the following standards and guidelines:
• New York State Stormwater Management Design Manual, dated July 31, 2024 (Design
Manual).
• New York State Standards and Specifications for Erosion and Sediment Control, dated
November 2016 (SSESC).
• Town of West Seneca Town Code (2025-09-08) - Chapter 102A Stormwater Management and
Erosion and Sediment Control
Stormwater quality will be enhanced through the implementation of temporary and permanent erosion
and sediment control measures, the proposed stormwater management practice(s), and other
construction-phase pollution controls outlined herein.
The proposed stormwater management approach consisting of pipes, open drainage ways, and on-
site stormwater management practices will adequately collect, treat, and convey the stormwater
runoff.
Bioretentions and a water quality unit will be used to manage and treat stormwater runoff generated
by the proposed redevelopment project with an increase in impervious area.
Pre- and post-development surface runoff rates have been evaluated for the 1-, 10-, and 100-year 24-
hour storm events. Comparison of pre- and post-development watershed conditions demonstrates that
the peak rate of runoff from the project site will not be increased.
The pollutant loading analysis indicates stormwater quality will be enhanced through the
implementation of the proposed stormwater management practices outlined herein.
The post-construction stormwater management practice(s) will be privately owned by Home Leasing.
Deed restrictions will be in place, which require operation and maintenance of the practice(s) in
accordance with the operation and maintenance plan.
Stormwater Pollution Prevention Plan
Page 2
2241067
Page 92 of 1493
Page 93
2.0 SITE CHARACTERISTICS
2.1 State Environmental Quality Review
The construction activity is subject to State Environmental Quality Review (SEQR). The project is
considered a Unlisted action. As such, SEQR coordination has been completed. Negative Declaration
issued on 1/27/2025, amended on 2/9/2026. A copy of the SEQR documentation, in accordance
with Part I.A.5. of GP-0-25-001, is provided in Appendix A, as Figure A-5 upon receipt.
2.2 Land Use and Topography
The project site is located within the R-50 zoning district. Multiple-family dwellings is a permitted use
subject to a special use permit within this district. Special Use Permit was obtained on 2/9/2026.
The overall site is slightly sloping, with slopes ranging from 1 to 10 percent. Site elevations range from
approximately 580 feet above mean sea level (MSL) to 600 feet MSL. The site generally slopes to the
north and the west towards Cayuga Creek.
2.3 Soils and Groundwater
The US Department of Agriculture (USDA) Web Soil Survey (http://websoilsurvey.nrcs.usda.gov/app/)
was used to obtain surficial soil conditions for the study area, as follows:
Table 1: USDA Soil Data
Depth to Depth to
Hydrologic Erosion
Map Symbol & Description Water Table Bedrock
Soil Group Factor K
(feet) (feet)
Fu - Fluvaquents and Udifluvents, frequently
A/D 0.17 0.50 >6.0
flooded
GaA - Galen very fine sandy loam, 0 to 3
A/D 0.37 1.75 >6.0
percent slopes
GaB - Galen very fine sandy loam, 3 to 8
A/D 0.37 1.75 >6.0
percent slopes
Te – Teel silt loam B/D 0.37 1.75 >6.0
Upon review of the soil data presented in Table 1, the project site does not contain soils with a soil
slope phase of D with a map unit name that inclusive of slopes greater than 25%, and does not contain
soils with a soil slope phase of E or F.
The project site is composed of HSG A soils, HSG B soils, and HSG D soils, as shown in the table below.
For the purposes of this report, HSG X/D soils were modeled as HSG D soils to reflect the undrained
condition.
Table 2: Project Site HSG Data
HSG A HSG B HSG C HSG D
0% 0% 0% 100%
Stormwater Pollution Prevention Plan
Page 3
2241067
Page 93 of 1493
Page 94
The Soil Conservation Service defines the hydrologic soil groups as follows:
• Type A Soils: Soils having a high infiltration rate and low runoff potential when thoroughly wet.
These soils consist mainly of deep, well drained to excessively drained sands or gravelly sands.
These soils have a moderate rate of water transmission.
• Type B Soils: Soils having a moderate infiltration rate when thoroughly wet and consisting
mainly of moderately deep to deep, moderately well to well drained soils with moderately fine
to moderately course textures. These soils have a moderate rate of water transmission.
• Type D Soils: Soils having a very low infiltration rate and high runoff potential when thoroughly
wet. These soils consist chiefly of clays that have high shrink-swell potential, soils that have a
permanent high water table, soils that have a clay pan or clay layer at or near the surface, and
soils that are shallow over nearly impervious material. These soils have a very low rate of water
transmission.
The soils map for the study area is presented in Appendix A, as Figure A-2.
2.4 Watershed Designation
The project site is not located in a restricted watershed identified in Appendix C of GP-0-25-001.
2.5 Receiving Water Bodies
The nearest natural classified water course into which runoff from the project site will discharge is
Cayuga Creek. Cayuga Creek is classified by NYSDEC as a Class C water course, and is not included
in the Section 303(d) list of impaired waters found in Appendix D of GP-0-25-001.
2.6 Aquifer Designation
The project site is not located over a US EPA designated Sole Source aquifer; nor is it located over a
Primary or Principal aquifer listed in the NYSDEC Technical and Operational Guidance Series (TOGS)
2.1.3 (1980).
2.7 Wetlands
A search on the NYSDEC Environmental Resource Mapper on April 16, 2026, and a review of GIS
data, determined that there are no known regulated wetlands located on or in the vicinity of the project
site. A wetland delineation is scheduled for Spring 2026 to field verify if there are any wetland on site.
2.8 Flood Plains
According to the National Flood Insurance Program Flood Insurance Rate Map (FIRM), Town of West
Seneca, New York, Community, the project site lies within Flood Zone X, areas determined to be outside
500-year floodplain The FEMA Flood Map has been provided in Appendix A, as Figure A-5.
Stormwater Pollution Prevention Plan
Page 4
2241067
Page 94 of 1493
Page 95
2.9 Listed, Endangered, or Threatened Species
A search was performed on the NYSDEC Environmental Resource Mapper on April 16, 2026, and
determined that the project site may contain threatened or endangered species, or critical habitat.
An Environmental Resource Map has been provided in Appendix A, as Figure A-4.
2.10 Historic Places
A search on the New York State Cultural Resource Information System (CRIS) database, performed on
April 16, 2026, revealed the construction activity is located within an archeologically sensitive area A
printout of the historic places screening map is presented in Appendix A, as Figure A-3. As such,
NYSOPRHP coordination has been completed and a Phase 1 Archeological Survey was conducted on
June 22, 2023 by archeologist. A copy of the NYSOPRHP documentation, in accordance with Part I.A.4.
of GP-0-25-001, is provided in Appendix A, as Figure A-3A upon receipt.
2.11 Rainfall Data
Rainfall data utilized in the modeling and analysis was obtained from the Cornell University online
Extreme Precipitation in New York & New England website (http://precip.eas.cornell.edu/). A local IDF
file was imported, and specific mass curves were generated, in HydroCAD to evaluate the pre- and
post-development stormwater runoff characteristics. Rainfall data specific to the portion of Erie
County under consideration, for various 24-hour storm events, is presented in the following Table:
Table 3: Rainfall Data
Storm Event 24-Hour Rainfall
Return Period (inches)
1-year 1.82
10-year 3.14
100-year 5.22
2.12 Pre-development Watershed Conditions
The pre-development project site is covered predominantly by buildings, pavement, grass, and woods.
Analysis of pre-development conditions considered existing drainage patterns, soil types, ground
cover, and topography. The Pre-Development Watershed Delineation Map has been provided in
Appendix A, as Figure A-5.
The results of the computer modeling used to analyze the overall watershed under pre-development
conditions are presented in Appendix D. A summary of the pre-development watershed runoff rates at
each Design Point is presented in Table 10.
Subcatchment one is a 3.38± acre watershed consisting of grass and pavement. Runoff flows south
overland via sheet and shallow concentrated flow toward a swale and catch basin at the southeast
corner of the site. This subcatchment is tributary to Design Point (AP) 1.
Subcatchment two is a 7.74± acre watershed consisting of grass, pavement, and multiple buildings.
Runoff flows west overland via sheet and shallow concentrated flow toward Cayuga Creek west of the
site. This subcatchment is tributary to Design Point (AP) 1.
Stormwater Pollution Prevention Plan
Page 5
2241067
Page 95 of 1493
Page 96
2.13 Post-development Watershed Conditions
The post-development project site is covered predominantly by buildings, pavement, sidewalks, grass,
and woods. The analysis of post-development conditions considered existing drainage patterns, soil
types, ground cover to remain, planned site development, site grading, and stormwater management
facilities proposed as part of site improvements. The Post-Development Watershed Delineation Map
has been provided in Appendix A, as Figure A-6.
The results of the computer modeling used to analyze the overall watershed under post-development
conditions are presented in Appendix D. A summary of the post-development watershed runoff rates
at each Design Point is presented in Table 11.
There are numerous locations and methods for providing controls of off-site discharge of stormwater
from the project site. Each has been designed to provide the above quantity controls by attenuating
stormwater runoff and releasing runoff to off-site locations at a rate equal to or less than that which
existed prior to development of the site. Each device is detailed on the accompanying plans. A Post-
Development Watershed Delineation Map, with the tributary areas to each stormwater management
practice proposed, has been provided in Appendix A, as Figure A-6.
2.14 Description of Design Points
The study area consists of the 11.2 acre project site and 5.7 acre area of disturbance. The overall
watershed was broken down into smaller watersheds, or subcatchments, to allow for analysis of runoff
conditions at several locations throughout the study area. Each of these locations was defined as a
Design Point (DP) in order to compare the effects resulting from stormwater management facilities
proposed as part of the project. Descriptions of each of the selected Design Points are provided below.
• Design Point 1: Off-site discharge to Cayuga Creek
3.0 STORMWATER MANAGEMENT PLANNING
Chapter 3 of the Design Manual outlines a six-step planning process for site planning and selection of
stormwater management practices that must be implemented for both new development and
redevelopment projects. This process is intended to develop a design that maintains pre-construction
hydrologic conditions through the application of environmentally sound development principles, as
well as treatment and control of runoff discharges from the site. The following sections outline the
step-by-step process and how it has been applied to this project.
The goals of this Stormwater Management Plan are to analyze the peak rate of runoff under pre- and
post-development conditions, to maintain the pre-development rate of runoff in order to minimize
impacts to adjacent or downstream properties, and to minimize the impact to the quality of runoff
exiting the site.
The Design Manual provides both water quality and water quantity objectives to be met by projects
requiring a “Full SWPPP”. These objectives will be met by applying stormwater control practices to limit
peak runoff rates and improve the quality of runoff leaving the developed site.
Stormwater Pollution Prevention Plan
Page 6
2241067
Page 96 of 1493
Page 97
3.1 STEP 1 – Site Planning
During the Site Planning process, the project site is evaluated for implementation of the green
infrastructure planning measures identified in Table 3.1 of the Design Manual, in order to preserve
natural resources and reduce impervious cover. Appendix C provides a description of each green
infrastructure planning measure, along with a project specific evaluation.
3.2 STEP 2 – Calculate Water Quality Treatment Volume (WQv)
Stormwater runoff from impervious surfaces is recognized as a significant contributor of pollution that
can adversely affect the quality of receiving water bodies. Therefore, treatment of stormwater runoff
is important since most runoff related water quality contaminants are transported from land,
particularly the impervious surfaces, during the initial stages of storm events.
3.2.1 NYSDEC Requirements for Water Quality Volume
The Design Manual requires that water quality treatment be provided for the initial flush of runoff from
every storm. The NYSDEC refers to the amount of runoff to be treated as the “Water Quality Volume”
(WQv). Section 4.2 of the Design Manual defines the Water Quality Volume as follows:
WQv = (P)(R V )(A)
12
Where: P = 90% Rainfall Event Number
Rv = 0.05 + 0.009 (I)
I = Impervious Cover (Percent)
A = Contributing Area in Acres
This definition ensures that, all other things being equal, the Water Quality Volume will increase along
with the impervious cover percentage.
3.2.2 Methodology for Redevelopment Projects
Chapter 9 of the Design Manual outlines alternative WQv treatment objectives for redevelopment
projects.
According to Section 9.2.1.B.IV, redevelopment activities can achieve the water quality treatment
objective through a combination of impervious cover reduction, standard SMPs, and alternative SMPs
that provide a weighted average of at least two of the above methods, calculated as shown below. In
this case, 100% of any new increase in impervious area to a given design point must be treated by
approved alternate SMPs, standard SMPs, or RR techniques.
%ALT = [25-(% ICRED+ %SMP+ %RR)] x 3
Where:
%ALT = Percent of redevelopment impervious area treated by alternative SMP(s)
%ICRED = Percent reduction in existing disturbed impervious area
%SMP = Percent of redevelopment impervious area treated by standard SMP(s)
%RR = Percent of redevelopment impervious area treated by runoff reduction techniques(s)
Stormwater Pollution Prevention Plan
Page 7
2241067
Page 97 of 1493
Page 98
This redevelopment project is proposing a combination of WQv treatment by standard practice(s) and
alternative practice(s) as shown in the following tables:
Table 4: Required WQv Treatment by Alternative Practice
WQv Treatment by Impervious Cover WQv Treatment by Runoff Reduction
Alternative Practice Reduction (IC) Standard Practice
% Area (ac) % Area (ac) % Area (ac) % Area (ac)
38 2.13 0 0 34 1.96 0 0
Table 5: WQv Required Summary
P (inches) A (ac) I (ac) Rv WQv Required
1.00 5.68 2.98 0.29 8,672 cf 0.20 AF
The Water Quality Volume equation has been applied to the drainage area tributary to each of the
stormwater quality practices proposed for this project. The practices have been sized to accommodate
the Water Quality Volume, as per the performance criteria presented in Chapter 6 and/or Chapter 9 of
the Design Manual. Water quality volume calculations for each of the proposed practices are
presented in Appendix C.
3.3 STEP 3 – Apply RR Techniques and Standard SMPs with RRv Capacity to Reduce Total
WQv
Land use change and development in the watershed increases the volume of runoff. As such,
reductions in the amount of runoff from new development, accomplished through the implementation
of a stormwater management plan for the site, will play an important role in the success or failure of
the watershed-wide stormwater management plan. Runoff reduction techniques can be applied to
manage, reduce, and treat stormwater, while maintaining and restoring natural hydrology through
infiltration, evapo-transpiration, and the capture and reuse of stormwater. Volume reduction
techniques by themselves typically are not sufficient to provide adequate attenuation of stormwater
runoff, but they can decrease the size of the peak runoff rate reduction facilities.
3.3.1 NYSDEC Requirements for Redevelopment
Section 9.2.1.B of the Design Manual indicates, “Although encouraged, meeting the RRv criteria is not
required for the redevelopment activity portion of a project. The need to provide RRv shall be
considered separately for each design point. For design points with a net increase in impervious area,
RRv is required for the increase in impervious area only.”
As such, bioretentions and a water quality unit have been applied to the project to meet the WQv
objective for the redevelopment activity of the project. The increase in impervious cover will be treated
as new development and both the WQv criteria and RRv criteria are met.
3.3.2 Application of Standard Stormwater Management Practices (SMPs) with RRv Capacity
The following Table demonstrates a summary of the standard SMP(s) with RRv capacity that have been
incorporated into the stormwater management plan for this project. The standard SMP(s) with RRv
capacity have been designed in accordance with Chapter 6 of the Design Manual. Refer to the contract
drawings for practice dimensions, material specifications, and installation details. Practice specific
calculations are presented in Appendix C.
Stormwater Pollution Prevention Plan
Page 8
2241067
Page 98 of 1493
Page 99
Table 6: Summary of Standard SMPs with RRv Capacity being Applied
WQv
Pretreatment
Standard Pretreatment WQv Reduced WQv Total WQv
Design Volume RRv
SMP with Volume Required /RRv Treated1 Provided2
Variant Required Capacity
RRv Capacity Provided (CF) (CF) Provided (CF) (CF)
(% of WQv)
(CF)
Filtration
F-5 25 835 40% 8,672 1,337 2,001 3,338
Bioretention
Footnotes:
1WQv Treated = WQV Required - RRv Provided
2Total WQv Provided = WQV Treated + RRv Provided
3.3.3 RRv Performance Summary
A summary of the RRv provided is presented in the following table:
Table 7: RRv Summary
RRv Provided % RRv Provided/
WQv Required (CF)
WQv Reduced (CF) WQv Reduced
8,672 1,337 >100%
As indicated in the above table, the RRv provided is greater than the RRv required for the project site.
As such, the RRv criteria has been met and the designer can proceed to Step 6.
3.4 STEP 4 – Calculate the Minimum RRv Required
As indicated above, Section 9.2.1.B of the Design Manual indicates, “Although encouraged, meeting
the RRv criteria is not required for the redevelopment activity portion of a project.”
3.5 STEP 5 – Apply Standard SMPs to Address Remaining Water Quality Volume
If the entire Water Quality Volume is not treated through implementation of RR techniques and
standard SMPs with RRv capacity, then the design must achieve the remaining WQv through the
standard SMPs listed in Table 3.3 of the Design Manual or the Alternative Practices outlined in Section
9.4 of the Design Manual.
Stormwater Pollution Prevention Plan
Page 9
2241067
Page 99 of 1493
Page 100
Table 8: Summary of WQv Provided
Step 5
Step 3
Reduced WQv to be
Step 2 WQv Reduction by
Treated by Standard
WQv Required (CF) Standard SMPs w/ RRv
SMPs or Alternative
Capacity (CF)1
Practices (CF)2
8,672 3,338 6,627
Footnotes:
1Step 3: WQv Reduction = RRv Provided + WQv Treated by Standard SMP with RRv Capacity
2Step 5: Reduced WQv to be Treated = WQv Required – WQv Reduced
Based upon the results listed in the above Table, the entire WQv has not been treated by application
of RR techniques and standard SMPs with RRv capacity. As such, the standard SMPs or the Alternative
Practices (without RRv capacity) described in the following sections, have been incorporated into the
stormwater management plan for this project, to meet the WQv objective. Practice-specific calculations
are presented in Appendix C.
3.5.1 Underground Stormwater Detention System
Underground stormwater detention systems store and detain stormwater runoff in order to meet water
quantity control requirements. Stormwater is stored in subsurface vaults and/or a system of large
diameter interconnected storage pipes. Stored water is then released at rates designed to reduce
peak run-off flows during post-development storms. Underground stormwater storage provides
minimal stormwater quality benefits, but can be an effective component of a development’s overall
stormwater management plan.
3.5.2 Hydrodynamic Separators
Hydrodynamic separators accelerate the separation of floating and settling pollutants from stormwater
through the use of a vortex. These pre-fabricated devices come in the form of an underground manhole
or vault. The devices have no moving parts and are typically fabricated from concrete and marine grade
aluminum.
During operation, stormwater runoff enters the unit tangentially to promote a gentle swirling motion in
a treatment chamber. As stormwater circles within the chamber, settable solids fall into a sump and
are retained. Buoyant debris, oil, and grease rise to the surface and are separated from the water as
it flows under a baffle wall. Finally, treated water exits the treatment chamber through a flow control
orifice located behind the baffle wall.
During low-flow conditions all runoff is diverted into the treatment chamber by a flow partition. At higher
flow rates, a portion of the runoff spills over the flow partition and is diverted around the treatment
chamber to prevent re-suspension and washout of previously trapped pollutants. Water that spills over
the partition flows into a head equalization chamber above the treatment chamber outlet. As the head
equalization chamber fills, the head differential driving flow through the treatment chamber collapses.
The result is that flow rates in the treatment chamber remain relatively constant even as total flow
rates increase substantially. This configuration further reduces the potential for re-suspension or
washout.
Stormwater Pollution Prevention Plan
Page 10
2241067
Page 100 of 1493
Page 101
According to Chapter 9 of the Design Manual, hydrodynamic separators of the type proposed for this
project have been approved for use as a pretreatment system in new and redevelopment projects or
as a primary treatment system on redevelopment projects.
According to Chapter 9 of the Design Manual, membrane filtration, of the type proposed for this project,
has been approved for use as a primary treatment system on redevelopment projects.
The following Table summarizes both the Water Quality Volume requirements and the treatment
volumes provided.
Table 9: Summary of Hydrodynamic Unit(s)
SWM NYSDEC Required WQv Approved Manufactured Product Name
Required
Practice Design Flow Rate Treatment Flow Rate and
WQv (CF)
ID Variant (CFS) (MTFR) (CFS) Manufacturer
Contech
HYD-1 ALT 6,627 1.88 2.00
Cascade CS4
3.6 STEP 6 - Apply Volume and Peak Rate Control
This report presents the pre-development and post-development features and conditions associated
with the rate of surface water runoff within the study area. For both cases, the drainage patterns,
drainage structures, soil types, and ground cover types are considered in this study.
3.6.1 NYSDEC Requirements for New Development
Chapter 4 of the Design Manual requires that projects meet three separate stormwater quantity
criteria:
1. The Channel Protection (CPv) requirement is designed to protect stream channels from
erosion. This is accomplished by providing 24 hours of extended detention for the 1-year, 24-
hour storm event. The Manual defines the CPv detention time as the center of mass detention
time through each stormwater management practice.
2. The Overbank Flood Control (Qp) requirement is designed to prevent an increase in the
frequency and magnitude of flow events that exceed the bank-full capacity of a channel, and
therefore must spill over into the floodplain. This is accomplished by providing detention
storage to ensure that, at each Design Point, the post-development 10-year 24-hour peak
discharge rate does not exceed the corresponding pre-development rate.
3. The Extreme Flood Control (Qf) requirement is designed to prevent the increased risk of flood
damage from large storm events, to maintain the boundaries of the pre-development 100-year
floodplain, and to protect the physical integrity of stormwater management practices. This is
accomplished by providing detention storage to ensure that, at each Design Point, the post-
development 100-year 24-hour peak discharge rate does not exceed the corresponding pre-
development rate.
Stormwater Pollution Prevention Plan
Page 11
2241067
Page 101 of 1493
Page 102
3.6.2 Methodology
In order to demonstrate that the NYSDEC detention requirements are being met, the Design Manual
requires that a hydrologic and hydraulic analysis of the pre- and post-development conditions be
performed using the Natural Resources Conservation Service Technical Release 20 (TR-20) and
Technical Release 55 (TR-55) methodologies. HydroCAD, developed by HydroCAD Software Solutions
LLC of Tamworth, New Hampshire, is a Computer-Aided-Design (CAD) program for analyzing the
hydrologic and hydraulic characteristics of a given watershed and associated stormwater management
facilities. HydroCAD uses the TR-20 algorithms and TR-55 methods to create and route runoff
hydrographs.
HydroCAD has the capability of computing hydrographs (which represent discharge rates characteristic
of specified watershed conditions, precipitation, and geologic factors) combining hydrographs and
routing flows though pipes, streams and ponds. HydroCAD can also calculate the center of mass
detention time for various hydraulic features. Documentation for HydroCAD can be found on their
website: http://www.hydrocad.net/.
For this analysis, the watershed and drainage system was broken down into a network consisting of
three types of components as described below:
1. Subcatchment: A relatively homogeneous area of land, which produces a volume and rate of
runoff unique to that area.
2. Reach: Uniform streams, channels, or pipes that convey stormwater from one point to another.
3. Pond: Natural or man-made impoundment, which temporarily stores stormwater runoff and
empties in a manner determined by its geometry and the hydraulic structure located at its
outlets.
Subcatchments, reaches, and ponds are represented by hexagons, squares, and triangles,
respectively, on the watershed routing diagrams provided with the computations included in Appendix
D and Appendix E.
The analysis of hydrologic and hydraulic conditions and proposed stormwater management facilities,
servicing the study area, was performed by dividing the tributary watershed into relatively
homogeneous subcatchments. The separation of the watershed into subcatchments was dictated by
watershed conditions, methods of collection, conveyance, and points of discharge. Watershed
characteristics for each subcatchment were then assessed from United States Geological Service
(USGS) 7.5-minute topographic maps, aerial photographs, a topographical survey, soil surveys, site
investigations, and land use maps.
Proposed stormwater management practices were designed and evaluated in accordance with the
Design Manual and local regulatory requirements. A local IDF file was imported, and specific mass
curves were generated, in HydroCAD to evaluate the pre- and post-development stormwater runoff
characteristics for various 24-hour storm events identified in the following Table.
Stormwater Pollution Prevention Plan
Page 12
2241067
Page 102 of 1493
Page 103
Table 10: Design Events
Facility 24-hour Storm Event
Storm Sewer 10-year
1-year
Stormwater Management Practice(s) 10-year
100-year
Flood Conditions 100-year
3.6.3 Performance Summary
A comparison of the total required and provided CPv for the 1-year 24-hour storm event is shown in
the following table:
Table 11: CPv Summary
Design Point Required CPv Provided CPv
(DP) (af) (af)
1 0.20 0.36
A comparison of the pre- and post-development watershed conditions was performed for all Design
Points and storm events evaluated herein. For all Design Points and design storms, this comparison
demonstrates that the peak rate of runoff will not be increased. Therefore, the project will not have a
significant adverse impact on the adjacent or downstream properties or receiving water courses.
The results of the computer modeling used to analyze the pre- and post-development watersheds are
presented in Appendix D and Appendix E, respectively. The following Table summarizes the results of
this analysis.
Table 12: Summary of Pre- and Post-Development Peak Discharge Rates
Pre- vs. Post-Development Discharge Rate (cfs)
Design Point 10-year 24-hour storm event 100-year 24-hour storm event
(DP) Pre Post Pre Post
1 16.3 13.9 36.8 31.7
3.7 Climate Change Consideration
This report presents the consideration for future physical risks due to climate change, in accordance
with Part III.A.2 of the permit. Overall site planning, control measures and practices, conveyance
systems and detention systems were evaluated against the seven (7) physical risks identified by
NYSDEC due to climate change pursuant to the Community Risk and Resiliency Act (CRRA), 6 NYCRR
490, and associated guidance. Appendix C provides a description of each consideration, specific to
the project.
Stormwater Pollution Prevention Plan
Page 13
2241067
Page 103 of 1493
Page 104
4.0 CONSTRUCTION SEQUENCE
This project has not received written approval from the Town of West Seneca allowing the disturbance
of more than five acres of land at any one time. Therefore, if the Contractor’s construction sequence
requires the disturbance of more than five acres at any one time, written approval must be obtained
from written approval from the Town of West Seneca prior to disturbing more than five acres at once.
The “Erosion and Sediment Control Plan” and the “Erosion and Sediment Control Plan Prior to
Construction” in the accompanying drawings and waiver request identifies the major construction
activities that are the subject of this SWPPP. The order (or sequence) in which the major activities are
expected to begin is presented on the accompanying drawings, though each activity will not necessarily
be completed before the next begins. In addition, these activities could occur in a different order if
necessary to maintain adequate erosion and sediment control. If this is the case, the contractor shall
notify the Owner’s/Operator’s Engineer overseeing the implementation of the SWPPP.
The Contractor will be responsible for implementing the erosion and sediment control measures
identified on the plans. The Contractor may designate these tasks to certain subcontractors as they
see fit, but the ultimate responsibility for implementing these controls and ensuring their proper
function remains with the Contractor.
In accordance with Part III.B.c.iv. a phasing plan for the project and sequencing plans for all phases
have been provided. The plans address clearing and grubbing, excavation and grading, utility and
infrastructure installation, final stabilization, and any other construction activity at the site that will
result in soil disturbance. Refer to the plans for further information on the project phasing and
sequencing.
5.0 CONSTRUCTION-PHASE POLLUTION CONTROL
The SWPPP and accompanying plans identify the temporary and permanent erosion and sediment
control measures that have been incorporated into the design of this project. These measures will be
implemented during construction, to minimize soil erosion and control sediment transport off-site, and
after construction, to control the quality and quantity of stormwater runoff from the developed site.
Erosion control measures, designed to minimize soil loss, and sediment control measures, intended
to retain eroded soil and prevent it from reaching water bodies or adjoining properties, have been
developed in accordance with the following documents:
• NYSDEC SPDES General Permit for Stormwater Discharges From Construction Activity, Permit
No. GP-0-25-001 (effective January 29, 2025 through January 28, 2030)
• New York State Standards and Specifications for Erosion and Sediment Control, NYSDEC
(November 2016)
The SWPPP and accompanying plans outline the construction scheduling for implementing the erosion
and sediment control measures. These documents include limitations on the duration of soil exposure,
criteria and specifications for placement and installation of the erosion and sediment control
measures, a maintenance schedule, and specifications for the implementation of erosion and
sediment control practices and procedures.
Temporary and permanent erosion and sediment control measures that shall be applied during
construction generally include:
Stormwater Pollution Prevention Plan
Page 14
2241067
Page 104 of 1493
Page 105
1. Minimizing soil erosion and sedimentation by stabilization of disturbed areas and by removing
sediment from construction site discharges.
2. Preservation of existing vegetation to the greatest extent practical. Following the completion
of construction activities in any portion of the site, permanent vegetation shall be established
on all exposed soils.
3. Site preparation activities to minimize the area and duration of soil disruption.
4. Establishment of permanent traffic corridors to ensure that “routes of convenience” are
avoided.
5.1 Temporary Erosion and Sediment Control Measures
The temporary erosion and sediment control measures described in the following sections are
included as part of the construction documents.
5.1.1 Stabilized Construction Access
Prior to construction, stabilized construction access(es) will be installed, per accompanying plans, to
reduce the tracking of sediment onto public roadways.
Construction traffic must enter and exit the site at the stabilized construction access(es). The intent is
to trap dust and mud that would otherwise be carried off-site by construction traffic.
The access(es) shall be maintained in a condition, which will control tracking of sediment onto public
rights-of-way or streets. When necessary, additional aggregate will be placed atop the filter fabric to
assure the minimum thickness is maintained. All sediment and/or soil spilled, dropped, or washed
onto public rights-of-way must be removed immediately. Periodic inspection and needed maintenance
shall be provided after each substantial rainfall event.
5.1.2 Dust Control
Water trucks shall be used as needed during construction to reduce dust generated on-site. Dust
control must be provided by the Contractor(s) to a degree that is acceptable to the Owner, and in
compliance with the applicable local and state dust control requirements.
5.1.3 Temporary Soil Stockpile
Materials, such as topsoil, will be temporarily stockpiled (if necessary) on the site during the
construction process. Stockpiles shall be located in an area away from storm drainage, water bodies
and/or courses, and will be properly protected from erosion by a surrounding silt fence barrier.
5.1.4 Silt Fencing
Prior to the initiation of and during construction activities, a geotextile filter fabric (or silt fence) will be
established downgradient of all disturbed areas. These barriers may extend into non-impact areas to
provide adequate protection of adjacent lands.
Clearing and grubbing will be performed only as necessary for the installation of the sediment control
barrier. To facilitate effectiveness of the silt fencing, daily inspections and inspections immediately
after significant storm events will be performed by the Contractor(s). Maintenance of the fence will be
performed as needed.
Stormwater Pollution Prevention Plan
Page 15
2241067
Page 105 of 1493
Page 106
5.1.5 Temporary Seeding
For areas undergoing clearing, grading, and disturbance as part of construction activities, where work
has temporarily ceased, temporary soil stabilization measures must be initiated by the end of the next
business day and completed within fourteen (14) days from the date the soil disturbance activity has
temporarily ceased.
5.1.6 Manufactured Insert Inlet Protection
Install insert inlet protection beneath the grate of all catch basins, to prevent sediment from entering
the catch basins and storm sewer system. Remove sediment accumulation and repair or replace insert
as necessary to ensure proper function.
5.1.7 Filter Fabric Drop Inlet Protection
Install filter fabric or silt fence with wooden stakes at the perimeter of existing or proposed catch basins
located in lawn areas, to prevent sediment from entering the catch basins and storm sewer system.
Remove sediment accumulation and repair or replace fabric as necessary to ensure proper function.
5.1.8 Erosion Control Blanket
Erosion control blankets shall be installed in accordance with manufacturer’s requirements on all
slopes exceeding 3:1. Erosion control blankets provide temporary erosion protection, rapid vegetative
establishment, and long-term erosion resistance to shear stresses generated by high runoff flow
velocities associated with steep slopes.
5.1.9 Stone Check Dams
Stone check dams will be installed within drainage ditches to reduce the velocity of stormwater runoff,
promote settling of sediment, and reduce sediment transport off-site.
Sediment accumulated behind the stone check dam will be removed as needed to maintain flow
through the stone check dam and prevent large flows from carrying sediment over or around the dam.
Stones shall be replaced as needed to maintain the design cross section of the structures.
5.1.10 Temporary Sediment Trap
Temporary sediment traps shall be constructed to intercept sediment-laden runoff, reduce the amount
of sediment leaving the disturbed areas, and protect drainage ways, properties, and rights-of-way.
Accumulated sediment shall be removed from the trap when it reaches no greater than 50 percent of
the design capacity. Sediment shall not be placed downstream from the embankment, adjacent to a
stream, or floodplain.
Temporary sediment traps depicted on the accompanying plans have been designed to provide 3,600
CF of storage per acre of tributary watershed.
5.1.11 Temporary Diversion Swales
Temporary diversion swales shall be used to divert off-site runoff around the construction site and
divert runoff from stabilized areas around disturbed areas.
5.1.12 Dewatering Operations
Dewatering will be used to intercept sediment-laden stormwater or pumped groundwater and allow it
to settle out of the pumped discharge prior to being discharged from the site. Water from dewatering
Stormwater Pollution Prevention Plan
Page 16
2241067
Page 106 of 1493
Page 107
operations shall be treated to eliminate the discharge of sediment and other pollutants. Water
resulting from dewatering operations shall be directed to temporary sediment traps or dewatering
devices. Temporary sediment traps and dewatering bags will be provided, installed, and maintained
at downgradient locations to control sediment deposits to downstream surfaces.
5.1.13 Fiber Roll
Prior to the initiation of and during construction activities, fiber rolls (12” minimum diameter) will be
established downgradient of all disturbed areas to reduce sheet flow on slopes. These rolls may extend
into non-impact areas to provide adequate protection of adjacent lands. Spacing will conform to
NYSDEC specification for straw bale dike.
Clearing and grubbing will be performed only as necessary for the installation of the fiber rolls. To
facilitate effectiveness, daily inspections and inspections immediately after significant storm events
will be performed by the Contractor(s) and maintenance will be performed as needed.
5.2 Permanent Erosion and Sediment Control Measures
The permanent erosion and sediment control measures described in the following sections are
included as part of the construction documents.
5.2.1 Establishment of Permanent Vegetation
Disturbed areas that will be vegetated must be seeded in accordance with the contract documents.
The type of seed, mulch, and maintenance measures as described in the contract documents shall
also be followed.
Permanent soil stabilization measures must be initiated by the end of the next business day and
completed within fourteen (14) days from the date the soil disturbance activity has permanently
ceased.
Final site stabilization is achieved when all soil-disturbing activities at the site have been completed
and a uniform, perennial vegetative cover with a density of 80 percent has been established or
equivalent stabilization measures (such as the use of mulches or geotextiles) have been employed on
all unpaved areas and areas not covered by permanent structures.
5.2.2 Rock Outlet Protection
Rock outlet protection shall be installed at the locations as indicated and detailed on the
accompanying plans. The installation of rock outlet protection will reduce the velocity and energy of
water, such that the flow will not erode downstream surfaces.
5.3 Implementation Schedule for Erosion and Sediment Control Measures
Proper implementation of the outlined erosion and sediment control measures is critical to minimizing
soil erosion and controlling off-site sediment transport during construction, as well as controlling the
quality and quantity of stormwater runoff from the developed site after construction. The following
table outlines the implementation schedule for initial placement of these measures, and the duration
for which they should remain in place.
Stormwater Pollution Prevention Plan
Page 17
2241067
Page 107 of 1493
Page 108
Table 13: Implementation Schedule for Erosion and Sediment Control Measures
Erosion and Sediment
Initial Placement Duration to Remain In-Place
Control Measure
Stabilized Construction Access Upon mobilizing to site Until construction is complete
Dust Control As needed As needed
Upon delivery of materials to the
Until materials have been placed
Temporary Soil Stockpile site or excavation of on-site
or removed from the site
materials for reuse
Prior to upgradient soil Until upgradient area has achieved
Silt Fencing
disturbance permanent stabilization
Apply to any disturbed soil that will
Apply additional seed as needed
Temporary Seeding remain exposed for more than 14
for temporary stabilization
days
Existing structures: prior to
Manufactured Insert Inlet upgradient soil disturbance Until upgradient area has achieved
Protection New structures: upon installation permanent stabilization
of structure/grate
Upon completion of slope grading Prior to final grading, or kept in
Erosion Control Blanket
operations place permanently
Existing swales: upon completion
of swale reshaping
Stone Check Dams Permanent
New swales: upon completion of
swale excavation
As needed during grading Until final grading of tributary area
Temporary Sediment Trap
operations is complete
Until permanent drainage methods
As needed to divert flow around are established (i.e. closed storm
Temporary Diversion Swales
work area sewer, open conveyance swales,
etc.)
Until excavation/backfilling is
Dewatering Operations As needed during excavation
complete
Prior to upgradient soil Until upgradient area has achieved
Fiber Roll
disturbance permanent stabilization
Permanent, apply additional seed
Establishment of Permanent As soon as possible after
as needed to achieve 80%
Vegetation completion of final grading
minimum uniform coverage
During installation of tributary
Rock Outlet Protection Permanent
culverts/pipes
5.4 Other Pollutant Controls
Part I.C.1 of GP-0-25-001 prohibits discharges from construction material wastewater, pollutants
used in vehicle and equipment operation and maintenance, vehicle and equipment washing and
toxic or hazardous substances.
Stormwater Pollution Prevention Plan
Page 18
2241067
Page 108 of 1493
Page 109
The following table identifies materials and/or chemicals commonly used and/or stored on
construction sites and should be addressed in the site-specific spill prevention and response plan:
Stormwater Pollution Prevention Plan
Page 19
2241067
Page 109 of 1493
Page 110
Table 14: Common Construction Pollutants
Material/Chemical Physical Description Stormwater Pollutants Location*
Pesticides Various colored to Chlorinated Herbicides used for
(insecticides, colorless liquid, hydrocarbons, noxious weed control
fungicides, powder, pellets, or organophosphates,
herbicides, grains carbamates, arsenic
rodenticides)
Fertilizer Liquid or solid grains Nitrogen, phosphorous Newly seeded areas
Cleaning solvents Colorless, blue, or Perchloroethylene, No equipment cleaning
yellow-green liquid methylene chloride, allowed in project limits
trichloroethylene,
petroleum distillates
Asphalt Black solid Oil, petroleum distillates Streets and roofing
Concrete White solid/grey liquid Limestone, sand, pH, Curb and gutter, building
chromium construction
Curing compounds Creamy white liquid Naphtha Curb and gutter
Hydraulic oil/fluids Brown oily petroleum Mineral oil Leaks or broken hoses
hydrocarbon from equipment
Gasoline Colorless, pale brown Benzene, ethyl benzene, Secondary containment /
or pink petroleum toluene, xylene, MTBE staging area
hydrocarbon
Diesel Fuel Clear, blue-green to Petroleum distillate, oil & Secondary containment /
yellow liquid grease, naphthalene, staging area
xylenes
Kerosene Pale yellow liquid Coal oil, petroleum Secondary containment /
petroleum distillates staging area
hydrocarbon
Antifreeze/coolant Clear green/yellow Ethylene glycol, propylene Leaks or broken hoses
liquid glycol, heavy metals from equipment
(copper, lead, zinc)
Sanitary toilets Various colored liquid Bacteria, parasites, and Staging area
viruses
Construction
materials
Granular fill Various colored solids Sediment Stockpile / fill areas
Subbase course Gray/brown solid Sediment, dust Stockpile
Topsoil Brown solid Sediment Stockpile
Mulch Various colored solid Sediment, debris Staging area
Seed Brown/yellow solid Nutrients, debris Staging area
HDPE Storm Pipe Black solid Staging area
SDR-35, SDR-21 Various colored solid Staging area
PVC Pipe
Metals Frames and Gray solid Staging area
Grates
Joint Sealant Light gray viscous Polyurethane Staging area
solid
*(Area where material/chemical is used on-site)
Stormwater Pollution Prevention Plan
Page 20
2241067
Page 110 of 1493
Page 111
5.5 Construction Housekeeping Practices
During the construction phase, the Contractor(s) will implement the following measures:
5.5.1 Sediment Sweeping/Vacuuming
Any sediment that is tracked by construction vehicles or erosion onto adjacent public or private
impervious surfaces must be swept or vacuumed, utilizing self-propelled and/or walk-behind
equipment, and removed on a daily basis. Kick brooms and sweeper attachments are not an
acceptable means of sweeping. Sweeping or vacuuming should not take place while tracked sediment
is wet. If tracked sediment is compacted, the sediment must be scraped loose prior to sweeping or
vacuuming.
5.5.2 Material Stockpiles
Material resulting from clearing and grubbing operations that will be stockpiled on-site, must be
adequately protected with downgradient erosion and sediment controls.
5.5.3 Equipment Cleaning and Maintenance
The Contractor(s) will designate areas for equipment cleaning, maintenance, and repair. The
Contractor(s) and subcontractor(s) will utilize those areas. The areas will be protected by a temporary
perimeter berm.
5.5.4 Detergents
The use of detergents for large-scale washing is prohibited (i.e., vehicles, buildings, pavement
surfaces, etc.)
5.5.5 Spill Prevention and Response
A Spill Prevention and Response Plan shall be developed, for the pollutants identified in Section 5.3,
for the site by the Contractor(s) that addresses the following:
1. Reducing chance of spills
2. Stopping the source of spills
3. Containing and cleaning up spills
4. Disposing of materials contaminated by spills
5. Training personnel responsible for spill prevention/response
6. Material handling procedures
7. Material storage requirements
The plan shall detail the steps required in the event of an accidental spill and shall identify contact
names and phone numbers of people and agencies that must be notified.
The plan shall include Safety Data Sheets (SDS) for all materials to be stored on-site. All workers on-
site will be required to be trained on safe handling and spill prevention procedures for all materials
used during construction. Regular tailgate safety meetings shall be held and all workers that are
expected on the site during the week shall be required to attend.
5.5.6 Concrete Washout Areas
A temporary concrete washout area shall be provided for every project where concrete will be poured
or otherwise formed on-site and shall consist of an excavated or above-ground lined construction pit
Stormwater Pollution Prevention Plan
Page 21
2241067
Page 111 of 1493
Page 112
where concrete trucks or equipment can be washed out after their loads have been discharged. Waste
generated from concrete wash water that shall not be allowed to flow into drainage ways, inlets,
receiving waters, highway right-of-way, or any location other than the designated concrete washout
area(s). Proper signage shall be placed adjacent to the facility to designate the “Concrete Washout
Area”. Locate the facility a minimum of 100-feet from drainage swales, storm drain inlets, wetlands,
streams, and other surface waters. Prevent surface water from entering the washout area.
The hardened residue from the concrete wash areas will be disposed of in the same manner as other
non-hazardous construction waste materials. Maintenance of the washout area shall include removal
of hardened material when 75% of the storage capacity is filled, and a minimum freeboard of 12
inches shall be maintained. The Contractor will be responsible for seeing that these procedures are
followed. The project may require the use of multiple concrete washout areas based on the frequency
of concrete pours.
5.5.7 Material Storage
Construction materials shall be stored in a dedicated staging area. The staging area shall be located
in an area that prevents negative impacts of construction materials on stormwater quality.
Chemicals, paints, solvents, fertilizers, and other toxic material must be stored in waterproof
containers. Except during application, the contents must be kept in trucks or within storage facilities.
Runoff containing such material must be collected, removed from the site, treated, and disposed of at
an approved solid waste or chemical disposal facility.
6.0 INSPECTIONS, MAINTENANCE, AND REPORTING
6.1 Inspection and Maintenance Requirements
6.1.1 Pre-Construction Inspection and Certification
Prior to the commencement of construction, the Qualified Inspector/Qualified Professional shall
conduct an assessment of the site and certify that the appropriate erosion and sediment control
measures have been adequately installed and implemented. The Contractor shall contact the Qualified
Inspector/Qualified Professional once the erosion and sediment control measures have been
installed.
6.1.2 Construction Phase Inspections and Maintenance
A Qualified Inspector/Qualified Professional, as defined in Appendix A of the General Permit GP-0-25-
001, shall conduct regular site inspections between the time this SWPPP is implemented and final site
stabilization. Site inspections shall occur at an interval of at least once every seven (7) calendar days.
The purpose of site inspections is to assess performance of pollutant controls. Based on these
inspections, the Qualified Inspector/Qualified Professional will decide whether it is necessary to modify
this SWPPP, add or relocate sediment barriers, or whatever else may be needed in order to prevent
pollutants from leaving the site via stormwater runoff. The general contractor has the duty to cause
pollutant control measures to be repaired, modified, maintained, supplemented, or whatever else is
necessary in order to achieve effective pollutant control.
Examples of particular items to evaluate during site inspections are listed below. This list is not
intended to be comprehensive. During each inspection the inspector must evaluate overall pollutant
Stormwater Pollution Prevention Plan
Page 22
2241067
Page 112 of 1493
Page 113
control system performance as well as particular details of individual system components. Additional
factors should be considered as appropriate to the circumstances.
1. Locations where vehicles enter and exit the site must be inspected for evidence of off-site
sediment tracking. A stabilized construction access will be constructed where vehicles enter
and exit. This access will be maintained or supplemented as necessary to prevent sediment
from leaving the site on vehicles.
2. Sediment barriers must be inspected and, if necessary, they must be enlarged or cleaned in
order to provide additional capacity. All material from behind sediment barriers will be
stockpiled on the up slope side. Additional sediment barriers must be constructed as needed.
3. Inspections will evaluate disturbed areas and areas used for storing materials that are exposed
to rainfall for evidence of, or the potential for, pollutants entering the drainage system. If
necessary, the materials must be covered or original covers must be repaired or
supplemented. Also, protective berms must be constructed, if needed, in order to contain
runoff from material storage areas.
4. Grassed areas will be inspected to confirm that a healthy stand of grass is maintained. The
site has achieved final stabilization once all areas are covered with building foundation or
pavement, or have a stand of grass with at least 80 percent density. The density of 80 percent
or greater must be maintained to be considered as stabilized. Areas must be watered,
fertilized, and reseeded as needed to achieve this goal.
5. All discharge points must be inspected to determine whether erosion control measures are
effective in preventing significant impacts to receiving waters.
The inspection reports must be completed entirely and additional remarks should be included if
needed to fully describe a situation. An important aspect of the inspection report is the description of
additional measures that need to be taken to enhance plan effectiveness. The inspection report must
identify whether the site was in compliance with the SWPPP at the time of inspection and specifically
identify all incidents of non-compliance.
Within one (1) business day of the completion of an inspection, the Qualified Inspector/Qualified
Professional shall notify the Owner/Operator and appropriate contractor or subcontractor of any
corrective actions that need to be taken. For corrective actions not requiring engineering design, the
contractor must begin implementing corrective actions within one business day and complete the
corrective actions within five business days. For corrective actions requiring engineering design, the
engineering design process must begin within five business days and the contractor must complete
the corrective action in a reasonable time frame but no later than 60 calendar days.
In addition to the inspections performed by the Qualified Inspector/Qualified Professional, the
Contractor shall perform routine inspections that include a visual check of all erosion and sediment
control measures. All inspections and maintenance shall be performed in accordance with the
inspection and maintenance schedule provided on the accompanying plans. Sediment removed from
erosion and sediment control measures will be exported from the site, stockpiled for later use, or used
immediately for general non-structural fill.
It is the responsibility of the general contractor to assure the adequacy of site pollutant discharge
controls. Actual physical site conditions or contractor practices could make it necessary to install more
structural controls than are shown on the accompanying plans. (For example, localized concentrations
of runoff could make it necessary to install additional sediment barriers, sediment traps, etc.)
Assessing the need for additional controls and implementing them or adjusting existing controls will
be a continuing aspect of this SWPPP until the site achieves final stabilization.
Stormwater Pollution Prevention Plan
Page 23
2241067
Page 113 of 1493
Page 114
6.1.3 Temporary Suspension of Construction Activities
For construction sites where soil disturbance activities have been temporarily suspended (e.g. Winter
shutdown) and temporary stabilization measures have been applied to all disturbed areas, the
frequency of Qualified Inspector/Qualified Professional inspections can be reduced to once every 30
calendar days. Prior to reducing the frequency of inspections, the Owner/Operator shall notify the
NYSDEC Region 9 stormwater contact person and the Town of West Seneca in writing.
6.1.4 Partial Project Completion
For construction sites where soil disturbance activities have been shut down with partial project
completion, all areas disturbed as of the project shutdown date have achieved final stabilization, and
all post-construction stormwater management practices required for the completed portion of the
project have been constructed in conformance with the SWPPP and are operational, the inspections
by the Qualified Inspector/Qualified Professional can stop. Prior to the shutdown, the Owner/Operator
shall notify the NYSDEC Region 9 stormwater contact person and the Town of West Seneca in writing.
If soil disturbance activities have not resumed within two years from the date of shutdown, a Notice of
Termination (NOT) shall be properly completed and submitted to the NYSDEC.
6.1.5 Post-Construction Inspections and Maintenance
Inspections and maintenance of final stabilization measures and post-construction stormwater
management practices shall be performed in accordance with Appendix G, once all disturbed areas
are stabilized and all stormwater management systems are in place and operable.
6.2 Reporting Requirements
6.2.1 Inspection Reports
Pursuant to Part IV.C of GP-0-25-001, inspection reports shall be prepared for the duration of
construction, as outlined herein, and shall be signed by the Qualified Inspector or Qualified
Professional. A sample inspection form is provided in Appendix F.
At a minimum, each inspection report shall record the following information:
1. Permit identification number; and
2. Date and time of inspection; and
3. Name and title of person(s) performing inspection; and
4. A description of the weather and soil conditions (e.g. dry, wet, saturated) at the time of the
inspection, including the temperature at the time of the inspection; and
5. A description of the condition of the runoff at all points of discharge from the construction site.
This must include identification of any discharges of sediment from the construction site.
Include discharges from conveyance systems (i.e. pipes, culverts, ditches, etc.) and overland
flow; and
6. A description of the condition of all surface waters of the State located within, or immediately
adjacent to, the property boundaries of the construction site which receive runoff from
disturbed areas. This must include identification of any discharges of sediment to the surface
waters of the State; and
Stormwater Pollution Prevention Plan
Page 24
2241067
Page 114 of 1493
Page 115
7. Identification of all erosion and sediment control practices and pollution prevention measures
that need repair or maintenance; and
8. Identification of all erosion and sediment control practices and pollution prevention measures
that were not installed properly or are not functioning as designed and need to be reinstalled
or replaced; and
9. Description and sketch (map) of areas with active soil disturbance activity, areas that have
been disturbed but are inactive at the time of the inspection, and areas that have been
stabilized (temporary and/or final) since the last inspection; and
10. Estimates, in square feet or acres, of the following areas:
a. Total area with active soil disturbance (not requiring either temporary stabilization or
final stabilization); and
b. Total area with inactive soil disturbance (requiring either temporary stabilization or
final stabilization); and
c. Total area that has achieved temporary stabilization; and
d. Total area that has achieved final stabilization; and
11. Current stage of construction of all SMPs and identification of all construction activity on site
that is not in conformance with the SWPPP and technical standards; and
12. Corrective action(s) that must be taken to install, repair, replace or maintain erosion and
sediment control practices and pollution prevention measures; and to correct deficiencies
identified with the construction of the SMP(s); and
13. Identification and status of all corrective actions that were required by previous inspection;
and
14. Digital photographs, with date stamp, that clearly show the condition of all practices that have
been identified as needing corrective actions. The qualified inspector must attach color copies
of the digital photographs to the inspection report being maintained onsite within seven (7)
calendar days of the date of the inspection. The qualified inspector must also take digital
photographs, with date stamp, that clearly show the condition of the practice(s) after the
corrective action has been completed. The qualified inspector must attach paper color copies
of the digital photographs to the inspection report that documents the completion of the
corrective action work within seven (7) calendar days of that inspection.
6.2.2 Site Log Book
Pursuant to Part I.E.3 of GP-0-25-001, the Owner/Operator shall retain a copy of the General Permit,
NOI, NOI Acknowledgment Letter, MS4 SWPPP Acceptance Form (if applicable), inspection reports,
contractor and subcontractor certification forms, and all documentation necessary to demonstrate
eligibility under the permit, at the construction site from commencement of construction activity until
the date that all areas of disturbance have achieved final stabilization and the Notice of Termination
has been submitted to the NYSDEC.
The Site Log Book shall be maintained on-site in a secure location (i.e. job trailer, on-site construction
office, or mailbox with lock) and must be accessible during normal business hours to an individual
performing a compliance inspection.
Stormwater Pollution Prevention Plan
Page 25
2241067
Page 115 of 1493
Page 116
6.2.3 Post Construction Records and Archiving
Following construction, the Owner/Operator shall retain copies of the SWPPP, the complete
construction Site Log Book, and records of all data used to complete the NOI to be covered by this
permit, for a period of at least five years from the date that the site is finally stabilized. This period may
be extended by the NYSDEC, at its sole discretion, at any time upon written notification.
Records shall be maintained of all post construction inspections and maintenance work performed in
accordance with the requirements outlined in Appendix G.
7.0 SWPPP IMPLEMENTATION RESPONSIBILITIES
A summary of the responsibilities and obligations of all parties involved with compliance with the
NYSDEC SPDES General Permit GP-0-25-001 conditions is outlined in the subsequent sections. For a
complete listing of the definitions, responsibilities, and obligations, refer to the SPDES General Permit
GP-0-25-001 presented in Appendix J.
7.1 Owner’s/Operator's Responsibilities
1. Ensure that control measures are selected, designed, installed, implemented and maintained
to minimize the discharge of pollutants and prevent a violation of the water quality standards,
meeting the non-numeric effluent limitations in Part II.B.1.(a)-(e) of the SPDES General Permit
and in accordance with the New York State Standards and Specifications for Erosion and
Sediment Control, dated November 2016.
2. Ensure that practices are selected, designed, installed, and maintained to meet the
performance criteria in the Design Manual. Practices must be designed to meet the applicable
sizing criteria in Part II.C.2.a., b., c. or d. of GP-0-25-001.
3. Retain the services of a “Qualified Inspector” or “Qualified Professional” as defined under GP-
0-25-001, to provide the services outlined in Section 7.5 “Qualified Inspector’s/Qualified
Professional’s Responsibilities.”
4. Retain the services of a “Qualified Professional,” as defined under GP-0-25-001, to provide
the services outlined in Section 2.3 “Owner’s/Operator’s Engineers Responsibilities.”
5. Have an authorized corporate officer sign the Owner/Operator Certification Form to
accompany the eNOI. A copy of the completed NOI is included in Appendix B.
6. Submit the electronic version of the NOI (eNOI) along with the MS4 SWPPP acceptance form
using the NYSDEC’s website (http://www.dec.ny.gov/chemical/43133.html).
7. Pay the required initial and annual fees upon receipt of invoices from NYSDEC. These invoices
are generally issued in the fall of each year. The initial fee is calculated as $110.00 per acre
disturbed plus $675.00 per acre of net increase in impervious cover, and the annual fee is
$110.00.
8. Prior to the commencement of construction activity, identify the contractor(s) and
subcontractor(s) that will be responsible for installing, constructing, repairing, replacing,
inspecting, and maintaining the erosion control practices included in the SWPPP and the
Stormwater Pollution Prevention Plan
Page 26
2241067
Page 116 of 1493
Page 117
contractor(s) and subcontractor(s) that will be responsible for constructing the SMPs included
in the SWPPP. Each of the contractors and subcontractors must identify at least one person
from their company to be the trained contractor that will be responsible for implementation of
the SWPPP. Ensure that at least one trained contractor is on site daily when soil disturbance
activities are being performed.
9. Schedule a pre-construction meeting which shall include the Town of West Seneca
representative, Owner’s/Operator’s Engineer, Qualified Inspector, Contractor, and their sub-
contractors to discuss responsibilities as they relate to the implementation of this SWPPP.
10. Retain the services of an independent certified materials testing and inspection firm operating
under the direction of a licensed Professional Engineer to perform regular tests, inspections,
and certifications of the construction materials used in the construction of all post-construction
stormwater management practices.
11. Retain the services of a NYS licensed land surveyor to perform an as-built topographic survey
of the completed post-construction stormwater management facilities.
12. Require the Contractor to fully implement the SWPPP prepared for the site by the
Owner/Operator’s Engineer to ensure that the provisions of the SWPPP are implemented from
the commencement of construction activity until all areas of disturbance have achieved final
stabilization and the Notice of Termination (NOT) has been submitted to the NYSDEC.
13. The Owner/Operator is authorized to commence construction activity as of the authorization
date indicated in the Letter of Authorization (LOA), which is sent by NYSDEC after a complete
eNOI is submitted.
14. Within five (5) business days of receipt of the LOA, send an electronic copy of the LOA to the
MS4 operator(s) with review authority.
15. Forward a copy of the LOA received from DEC to the Owner’s/Operator’s Engineer for project
records, and to the Contractor for display at the construction site.
16. As of the date the LOA is received, the Owner/Operator must make the eNOI, SWPPP and LOA
available for review and copying in accordance with the requirements in Part VII.H. of GP-0-25-
001. When applicable, as of the date an updated LOA is received, the Owner/Operator must
make the updated LOA available for review and copying in accordance with the requirements
in Part VII.H.
17. The Owner/Operator must ensure compliance with all requirements of GP-0-25-001 and that
the provisions of the SWPPP, including any changes made to the SWPPP in accordance with
Part III.A.5., are properly implemented and maintained from the commencement of
construction activity until all area of disturbance have achieved final stabilization; and the
Owner/Operator’s coverage under the permit is terminated in accordance with Part V.A.5.a.
18. As of the date of the commencement of construction activities until Part I.E.2.a. and b. have
been met, the Owner/Operator must maintain at the construction site, a copy of all
documentation necessary to demonstrate eligibility with GP-0-25-001, a copy of GP-0-25-001,
the SWPPP, the signed SWPPP Preparer Certification Form, the signed MS4 SWPPP
Acceptance Form, signed Owner/Operator Certification Form, eNOI, and LOA, and LOA
transmittal to the MS4 Operator in accordance with Part I.D.3.c.
Stormwater Pollution Prevention Plan
Page 27
2241067
Page 117 of 1493
Page 118
19. The Owner/Operator must maintain at the construction site, until Part I.E.2.a and b. have been
met, as of the date the documents become final or are received, a copy of the responsible
contractor’s or subcontractor's certification statement(s) in accordance with Part III.A.7, and
inspection reports in accordance with Part IV.C.4. and 6.
20. The Owner/Operator must maintain the documents in a secure location, such as a job trailer,
on-site construction office, or mailbox with lock. The secure location must be accessible during
normal business hours to an individual performing a compliance inspection. The documents
must be paper documents unless electronic documents are accessible to the inspector during
an inspection to the same extent as a paper copy stored at the site would be. If electronic
documents are kept on site, the Owner/Operator must maintain functional equipment on site
available to an inspector during normal hours of operation such that an inspector may view
the electronic documents in a format that can be read in a similar manner as a paper record
and in a legally dependable format with no less evidentiary value than their paper equivalent.
21. Upon finding a significant non-compliance with the practices described in the SWPPP or
violation of GP-0-25-001, NYSDEC may order an immediate stop to all construction activity at
the site until the non-compliance is remedied. The stop work order must be in writing, describe
the non-compliance in detail, and be sent to the Owner/Operator. Forward a copy of any stop
work order received immediately to the Owner’s/Operator’s Engineer and to the Contractor.
22. If any human remains or archaeological remains are encountered during excavation, the
Owner/Operator must immediately cease, or cause to cease, all construction activity in the
area of the remains and notify the appropriate Regional Water Engineer (RWE). Construction
activity shall not resume until written permission to do so has been received from the RWE.
23. To be authorized to implement modifications to the information previously submitted in the
eNOI, the Owner/Operator must notify NYSDEC via email at [email protected]
requesting access to update the eNOI, update the eNOI to reflect the modifications and
resubmit the eNOI in accordance with Part I.D., and receive an updated LOA.
24. The eNOI, SWPPP, LOA, updated LOAs, and inspection reports required by GP-0-25-001 are
public documents that the Owner/Operator must make available for review and copying by any
person within five (5) business days of the Owner/Operator receiving a written request by any
such person to review these documents. Copying of documents will be done at the requester’s
expense.
25. The Owner/Operator must terminate coverage when the project reaches total project
completion, has a planned shutdown with partial project completion, is changing
Owner/Operator or has obtained coverage under an alternative general SPDES permit or an
individual SPDES permit.
26. Have a qualified inspector perform a final site inspection prior to submitting the eNOT.
27. Have the MS4 sign the MS4 Acceptance statement on the eNOT in accordance with the
requirements in Part VII.J.
28. Prior to submitting a Notice of Termination, ensure for SMP(s) that are privately owned, the
Owner/Operator has a mechanism in place that requires operation and maintenance of the
practice(s) in accordance with the operation and maintenance plan, such as a deed covenant
in the Owner/Operator’s deed of record.
Stormwater Pollution Prevention Plan
Page 28
2241067
Page 118 of 1493
Page 119
29. Submit a complete Notice of Termination form electronically using the NYSDEC eNOT.
Coverage is terminated as of the termination date indicated in the Letter of Termination (LOT),
which is sent by NYSDEC after a complete eNOT is submitted.
30. Request and receive all SWPPP records from the Owner’s/Operator’s Engineer and archive
those records, along with the LOT, for a period of at least five (5) years from the date that
NYSDEC accepts a complete NOT submitted.
31. Implement the Post-Construction Inspections and Maintenance procedures outlined in
Appendix G.
32. The Owner/Operator must keep the SWPPP current so that it at all times accurately documents
the erosion and sediment controls practices that are being used or will be used during
construction, and all post-construction stormwater management practices that will be
constructed on the site. At a minimum, the Owner/Operator shall amend the SWPPP, including
construction drawings:
a) Whenever the current provisions prove to be ineffective in minimizing pollutants in
stormwater discharges from the project site;
b) Whenever there is a change in design, construction, or operation at the construction
site that has or could have an effect on the discharge of pollutants; and
c) To address issues or deficiencies identified during an inspection by the “Qualified
Inspector,” the Department, or other Regulatory Authority.
d) To document the final construction conditions.
33. When property ownership changes or when there is a change in operational control over the
construction plans and specifications, the original owner or operator must notify the new owner
or operator, in writing, of the requirement to obtain permit coverage by submitting a NOI with
the Department, in conformance with Part I.G.. For construction activities subject to the
requirements of a regulated, traditional land use control MS4, the original owner or operator
must also notify the MS4, in writing, of the change in ownership at least 30 calendar days prior
to the change in ownership.
7.2 Owner’s/Operator’s Engineer’s Responsibilities
1. Prepare the SWPPP using good engineering practices, best management practices, and in
compliance with all federal, state, and local regulatory requirements.
2. Prepare the electronic Notice of Intent (eNOI) (see Appendix B) and sign the “SWPPP Preparer
Certification Form.” Forward the Owner/Operator Certification Form to the Owner/Operator for
signature.
3. Provide copies of the SWPPP to the Town of West Seneca once all signatures and attachments
are complete.
4. Enter Contractor’s information in Section 7.5 “SWPPP Participants” once a Contractor is
selected by the Owner/Operator.
5. Participate in a pre-construction meeting which shall include the Town of West Seneca
representative, Owner/Operator, Qualified Inspector, Contractor, and all subcontractors to
discuss responsibilities as they relate to the implementation of this SWPPP.
Stormwater Pollution Prevention Plan
Page 29
2241067
Page 119 of 1493
Page 120
6. Update the SWPPP each time there is a significant modification to the pollution prevention
measures or a change of the principal Contractor working on the project who may disturb site
soil.
7.3 Contractor's Responsibilities
1. Sign the SWPPP Contractor's Certification Form contained within Appendix B and forward to
the Owner’s/Operator’s Engineer for inclusion in the Site Log Book.
2. Identify at least one Trained Contractor that will be responsible for implementation of this
SWPPP. Ensure that at least one Trained Contractor is on site on a daily basis when soil
disturbance activities are being performed. The Trained Contractor shall inspect the erosion
and sediment control practices and pollution prevention measures being implemented within
the active work area daily to ensure that they are being maintained in effective operating
conditions at all times. For corrective actions not requiring engineering design, the contractor
must begin implementing corrective actions within one business day and complete the
corrective actions within five business days. For corrective actions requiring engineering
design, the engineering design process must begin within five business days and the
contractor must complete the corrective action in a reasonable time frame but no later than
60 calendar days.
3. Provide the names and addresses of all subcontractors working on the project site. Require all
subcontractors who will be involved with construction activities that will result in soil
disturbance to identify at least one Trained Contractor that will be on site on a daily basis when
soil disturbance activities are being performed; and to sign a copy of the Subcontractor’s
Certification Form contained within Appendix B, then forward to the Owner’s/Operator’s
Engineer for inclusion into the Site Log Book. This information must be retained as part of the
Site Log Book.
4. Maintain a Spill Prevention and Response Plan in accordance with requirements outlined in
Section 5 of this SWPPP. This plan shall be provided to the Owner’s/Operator’s Engineer for
inclusion in the Site Log Book, prior to mobilization on-site.
5. Participate in a pre-construction meeting which shall include the Town of West Seneca
representative, Owner/Operator, Owner’s/Operator’s Engineer, Qualified Inspector, and all
subcontractors to discuss responsibilities as they relate to the implementation of this SWPPP.
6. If Contractor plans on utilizing adjacent properties for material, waste, borrow, or equipment
storage areas, or if Contractor plans to engage in industrial activity other than construction
(such as operating asphalt and/or concrete plants) at the site, Contractor shall submit
appropriate documentation to the Owner’s/Operator’s Engineer so that the SWPPP can be
modified accordingly.
7. Implement site stabilization, erosion and sediment control measures, and other requirements
of the SWPPP.
8. In accordance with the requirements in the most current version of the NYS Standards and
Specifications for Erosion and Sediment Control, conduct inspections of erosion and sediment
control measures installed at the site to ensure that they remain in effective operating
condition at all times. Prepare and retain written documentation of inspections as well as of
Stormwater Pollution Prevention Plan
Page 30
2241067
Page 120 of 1493
Page 121
all repairs/maintenance activities performed. This information must be retained as part of the
Site Log Book.
9. Begin implementing corrective actions within one (1) business day of receipt of notification by
the Qualified Inspector/Qualified Professional of any corrective actions. For corrective actions
not requiring engineering design, the contractor must begin implementing corrective actions
within one business day and complete the corrective actions within five business days. For
corrective actions requiring engineering design, the engineering design process must begin
within five business days and the contractor must complete the corrective action in a
reasonable time frame but no later than 60 calendar days.
10. Maintain a record of the date(s) and location(s) that soil restoration is performed in accordance
with the accompanying plans and NYSDEC Division of Water’s publication “Deep-Ripping and
Decompaction,” dated April 2008. A copy of this publication is provided in Appendix H. The
record that is to be maintained shall be a copy of the overall site grading plan delineating the
area(s) and date(s) that the soil was restored.
11. Upon completion of all construction at the site, the contractor responsible for overall SWPPP
Compliance shall sign the certification on their Contractor Certification Form indicating that:
a.) all temporary erosion and sediment control measures have been removed from the site, b.)
the on-site soils disturbed by construction activity have been restored in accordance with the
SWPPP and the NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction,”
and c.) all permanent stormwater management practices required by the SWPPP have been
installed in accordance with the contract documents.
7.4 Qualified Inspector’s/Qualified Professional’s Responsibilities
1. Participate in a pre-construction meeting with the Town of West Seneca representative,
Owner/Operator, Owner/Operator’s Engineer, Contractor, and their subcontractors to discuss
responsibilities as they relate to the implementation of this SWPPP.
2. Conduct an initial assessment of the site prior to the commencement of construction and
certify in an inspection report that the appropriate erosion and sediment control measures
described within this SWPPP have been adequately installed and implemented to ensure
overall preparedness of the site.
3. Provide on-site inspections to determine compliance with the SWPPP. Site inspections shall
occur at an interval of at least once every seven calendar days. A written inspection report
shall be provided to the Owner/Operator and general contractor within one business day of
the completion of the inspection, with any deficiencies identified. A sample inspection form is
provided in Appendix F.
4. Prepare an inspection report subsequent to each and every inspection that shall
include/address the items listed in Part IV.C.4 of GP-0-25-001. Sign all inspection reports and
maintain on site with the SWPPP.
5. Notify the owner/operator and appropriate contractor or subcontractor of any corrective
actions that need to be taken.
Stormwater Pollution Prevention Plan
Page 31
2241067
Page 121 of 1493
Page 122
6. Prepare a construction Site Log Book to be used as a record of all inspection reports generated
throughout the duration of construction. Ensure that the construction Site Log Book is
maintained and kept up-to-date throughout the duration of construction.
7. Review the Contractor’s SWPPP records on a periodic basis to ensure compliance with the
requirements for daily reports, soil restoration, inspections, and maintenance logs.
8. Based on the as-built survey and material testing certifications performed by others, the
Qualified Professional shall perform evaluations of the completed stormwater management
practices to determine whether they were constructed in accordance with this SWPPP.
9. The Qualified Professional shall conduct a final site assessment and prepare a certification
letter to the Owner/Operator indicating that, upon review of the material testing and inspection
reports prepared by the firm retained by the Owner/Operator, review of the completed
topographic survey, and evaluation of the completed stormwater management facilities, the
stormwater management facilities have been constructed substantially in accordance with the
contract documents and should function as designed.
10. Prepare the Notice of Termination (NOT). The Qualified Professional shall sign the NOT
Certifications VI (Final Stabilization) and VII (Post-construction Stormwater Management
Practices) and forward the NOT to the Owner/Operator for signature on Certification VIII
(Owner/Operator Certification).
11. The owner’s or operator’s coverage is terminated as of the termination date indicated in the
Letter of Termination (LOT), which is sent by NYSDEC after a complete eNOT is submitted.
12. Transfer the SWPPP documents, along with all NOI's, LOA, permit certificates, NOT's, LOT,
construction Site Log Book, and written records required by the General Permit to the
Owner/Operator for archiving.
Stormwater Pollution Prevention Plan
Page 32
2241067
Page 122 of 1493
Page 123
7.5 SWPPP Participants
1. Owner’s/Operator’s Engineer 3: Kristopher Winkler, PE
LaBella Associates, DPC
300 Pearl Street, Suite 130
Buffalo, NY 14202
Phone: (716) 483-3153
2. Owner/Operator 4: Home Leasing
75 South Clinton Avenue, Suite 700,
Rochester, NY 14604
Phone: 585-262-6210
3. Contractor5,6: Name and Title:
Company Name:
Mailing Address:
Phone:
Fax:
3
Refer to Appendix B for the SWPPP Preparer Certification Form.
4
Refer to Appendix B for the Owner/Operator Certification Form.
5
Refer to Appendix B for Contractor and Subcontractor Certification Form.
6
Contractor’s information to be entered once the Contractor has been selected.
Stormwater Pollution Prevention Plan
Page 33
2241067
Page 123 of 1493
Page 124
Page 124 of 1493
Page 125
Appendix A :
FIGURES
A-1: Site Location Map
A-2: Soils Map
A-3: Historic Places Screening Map
A-4: Environmental Resource Map
A-5: Environmental Review Documentation
A-6: FEMA Firm Map
A-7: Pre-Development Watershed Delineation Map
A-8: Post-Development Watershed Delineation Map
Page 125 of 1493
Page 126
Page 126 of 1493
Page 127
HARLEM ROAD
D
R OA
EK
RE
G AC
YU
CA
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
PROJECT LOCATION
cts\92100-92199\92112.00 - CONFIDENTIAL - WOH Gross Wetland Violation\DWG\9
CLIN
TON
STR
EET
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:40 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SITE LOCATION MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-1
Page 127 of 1493
Page 128
Page 128 of 1493
Page 129
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:42 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS MAP 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2a
Page 129 of 1493
Page 130
Page 130 of 1493
Page 131
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appen
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:43 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS LEGEND -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2b
Page 131 of 1493
Page 132
Page 132 of 1493
Page 133
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:45 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS TABLE -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2c
Page 133 of 1493
Page 134
Page 134 of 1493
Page 135
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
Missing or invalid reference It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:45 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
SWPPP FIGURE - NOT FOR CONSTRUCTION
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
File: ..\references\A-3 Historic Places Screening Map (CRIS)\Titleblock - 8
DRAWING NAME:
date of such alteration, and a specific description of the alteration.
DRAWN BY: DATE: PROJECT NO.:
HISTORIC PLACES SCREENING MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-3
Page 135 of 1493
Page 136
Page 136 of 1493
Page 137
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:47 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
ENVIRONMENTAL RESOURCE MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-4
Page 137 of 1493
Page 138
Page 138 of 1493
Page 139
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appen
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:50 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
FEMA FIRM MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-5
Page 139 of 1493
Page 140
Page 140 of 1493
Page 141
Page 141 of 1493
Page 142
Page 142 of 1493
Page 143
Page 143 of 1493
Page 144
Page 144 of 1493
Page 145
Page 145 of 1493
Page 146
Page 146 of 1493
Page 147
AP-1
593.19
594.95
594.92 602.49
602.51
ES-1
ES-2
DS
DS
600.04
FLAG
POLE
MB
LEGEND
SUBCATCHMENT BOUNDARY
Tc PATH
# SUBCATCHMENT
# REACH
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:59:33 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and SWPPP FIGURE - NOT FOR CONSTRUCTION
N DRAWING NAME:
date of such alteration, and a specific description of the alteration.
DRAWN BY: DATE: PROJECT NO.:
PRE-DEVELOPMENT WATERSHED DELINEATION MAP 04/20/2026 2241067
VERSION 21.1
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2026 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON STREET, BUFFALO, NY 14224
A-6
Page 147 of 1493
Page 148
Page 148 of 1493
Page 149
AP-1
593.19
600.14
PS-7 599
600
601
PS-1
594.92 599 602.51
600
599
598
60
600
598
599
599
600
600
597
09098
597
598
599
1
600
6559
60
0
600
PS-6
600
600
598
599
599
600
600
595
596
597
598
600
600
PS-5
599
600599
FFE=600.75'
55 98765
600
60909
59
600 600
60
600
0
599
599
600
599
PS-2 599
59
599
9
599 599
599
595
596
598
597
600
600
598
599
598
599
599
DS
600
PS-3
DS
559998778
600
559
559999876
00 5599678
6
600
PS-4
59 559998766 PS-8
59
9 5599789 599.84
9
598
59 8
7 5
5965
59
595
598.87 9
59678
59 59
99
55595678
559 9998765
598
LEGEND
606.31 607.17
SUBCATCHMENT BOUNDARY
Tc PATH
# SUBCATCHMENT
# REACH
POND
#
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 11:02:52 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
N altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
POST-DEVELOPMENT WATERSHED DELINEATION MAP 04/20/2026 2241067
VERSION 21.1
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2026 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON STREET, BUFFALO, NY 14224
A-7
Page 149 of 1493
Page 150
Page 150 of 1493
Page 151
Appendix B :
FORMS
Notice of Intent (NOI) Draft
MS4 SWPPP Acceptance Form
SWPPP Preparer Certification Form
Owner/Operator Certification Form
Contractor and Subcontractor Certification Forms
Notice of Termination (NOT)
Page 151 of 1493
Page 152
Page 152 of 1493
Page 153
MS4 SWPPP Acceptance Form
for construction activities seeking authorization under the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI
and submitted to NYSDEC electronically.)
I. Project Owner/Operator Information
1. Owner/Operator Name:
2. Contact Person:
3. Street Address:
4. City/State/Zip:
II. Project Site Information
5. Project/Site Name:
6. Street Address:
7. City/State/Zip:
III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance Information
8. SWPPP Reviewed by:
9. Title/Position:
10. Date Final SWPPP Reviewed and Accepted:
IV. Regulated MS4 Information
11. Name of MS4 Operator:
12. MS4 SPDES Permit Identification Number: NYR20A
13. Street Address:
14. City/State/Zip:
15. Telephone Number:
Page 1 of 2
Page 153 of 1493
Page 154
MS4 SWPPP Acceptance Form - continued
V. Certification Statement - MS4 Official (principal executive officer or ranking elected official) or
Duly Authorized Representative
I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project
identified in section II. of this form has been reviewed and meets the substantive requirements in the
SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP).
Note: The MS4 Operator, through the acceptance of the SWPPP, assumes no responsibility for the
accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of
the SWPPP by the MS4 Operator does not relieve the owner/operator or their SWPPP preparer of
responsibility or liability for errors or omissions in the plan.
Printed Name1:
Title/Position:
Signature:
Date:
VI. Additional Information
1 Printed name of the principal executive officer or ranking elected official for the MS4 Operator or their
duly authorized representative in accordance with CGP Part VII.J.2.
(NYSDEC - MS4 SWPPP Acceptance Form - January 2025)
Page 2 of 2
Page 154 of 1493
Page 155
SWPPP Preparer Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and
submitted to NYSDEC electronically.)
Project/Site Name:
eNOI Submission ID:
Owner/Operator Name:
Certification Statement – SWPPP Preparer
I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) has been
prepared in accordance with the requirements of GP-0-25-001. I certify under penalty
of law that the SWPPP and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge
and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
SWPPP Preparer First Name MI SWPPP Preparer Last Name
Signature Date
Revised: January 2025
Page 155 of 1493
Page 156
Owner/Operator Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b. or Part I.F.2. and 3., the completed form must be attached to the eNOI or the
Request to Continue Coverage, and submitted to NYSDEC electronically.
Project/Site Name: ________________________________________________________
eNOI Submission ID: _________________________________________________
eNOI Submitted by: Owner/Operator SWPPP Preparer Other
Certification Statement - Owner/Operator
I hereby certify that I read, and will comply with, the GP-0-25-001 permit requirements. I understand that
authorization to discharge under the permit for the project/site named above is dependent on receipt of a
Letter of Authorization (LOA) or a Letter of Continued Coverage (LOCC) from the New York State
Department of Environmental Conservation (NYSDEC) in accordance with CGP Part I.D.3.b. or Part I.F.4.
I am aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.
Owner/Operator First Name MI Owner/Operator Last Name
___________________________________________________________
Signature
________________________________
Date
Revised: January 2025
Page 156 of 1493
Page 157
Stormwater Pollution Prevention Plan
Contractor Certification Statement
(Responsible for overall SWPPP Compliance)
West Seneca
Town of West Seneca, Erie County, New York
This is to certify that the following contracting firm will be responsible for installing, constructing, repairing, inspecting and/or
maintaining the erosion and sediment control practices and post-construction stormwater management control practices
required by the SWPPP.
Contracting Firm Information
Name:
Address:
Telephone & Fax:
Trained Contractor(s) 1 Responsible for SWPPP Implementation (Provide name, title, and date of last training)
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
Prior to commencement of construction activity, the following certification shall be issued:
I hereby certify under penalty of law that I understand and agree to comply with the requirements of the SWPPP and agree to
implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner
or operator must comply with the requirements of the most current version of the New York State Pollutant Discharge
Elimination System (SPDES) Construction General Permit (CGP) for Stormwater Discharges from Construction Activities and
that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that
there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine
and imprisonment for knowing violations
Printed Name:
Title/Position:
Signature: Date:
Upon completion of construction activities, the following certification shall be issued, prior to issuance of the NOT:
I hereby certify that that all permanent stormwater management practices required by the SWPPP have been installed in
accordance with the contract documents. I further certify that all temporary erosion and sediment control measures have
been removed from the site, and that the on-site soils disturbed by construction activity have been restored in accordance
with the SWPPP and the NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction”.
Printed Name:
Title/Position:
Signature: Date:
1 “Trained Contractor” means an employee from a contracting (construction) company that has received four (4) hours of Department endorsed training in proper erosion and sediment
control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the “trained contractor” shall receive four (4)
hours of training every three (3) years. It can also mean an employee from the contracting (construction) company that meets the “qualified inspector” qualifications (e.g. licensed
Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registe red Landscape Architect, provided they
have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil an d Water Conservation District, or other Department
endorsed entity). The “Trained Contractor” will be responsible for the day to day implementation of the SWPPP.
Page 157 of 1493
Page 158
Stormwater Pollution Prevention Plan
Subcontractor Certification Statement
(whose work involves soil disturbance)
West Seneca
Town of West Seneca, Erie County, New York
Each Subcontractor whose work will involve soil disturbance of any kind is required to complete and sign this Certification
Statement before commencing any construction activity at the site. This completed Certification Statement(s) shall be
maintained at the construction site in the Site Log Book.
Subcontracting Firm Information
Name:
Address:
Telephone & Fax:
Trained Contractor(s) 2 Responsible for SWPPP Implementation (Provide name, title, and date of last training)
Prior to commencement of construction activities, the following certification shall be issued:
I hereby certify under penalty of law that I understand and agree to comply with the requirements of the SWPPP and agree to
implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner
or operator must comply with the requirements of the most current version of the New York State Pollutant Discharge
Elimination System (SPDES) Construction General Permit (CGP) for Stormwater Discharges from Construction Activities and
that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that
there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine
and imprisonment for knowing violations
Printed Name:
Title/Position:
Signature: Date:
2 “Trained Contractor” means an employee from a contracting (construction) company that has received four (4) hours of Department endorsed training in proper erosion and sediment
control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the “trained contractor” shall receive four (4)
hours of training every three (3) years. It can also mean an employee from the contracting (construction) company that meets the “qualified inspector” qualifications (e.g. licensed
Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registe red Landscape Architect, provided they
have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil an d Water Conservation District, or other Department
endorsed entity). The “Trained Contractor” will be responsible for the day to day implementation of the SWPPP.
Page 158 of 1493
Page 159
eNOT Owner or Operator Certification
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I certify that I have met the requirements of CGP Part V.A.1., 2., 3., and 4. I certify under
penalty of law that this document and all attachments were prepared under my direction
or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for
knowing violations.
a. Printed name of the Owner or Operator:
b. Title/Position:
c. Signature:
d. Date:
Page 159 of 1493
Page 160
eNOT Qualified Inspector Certification – Final Stabilization
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.i., ii., and iii. or CGP Part
V.A.1.b.i., ii., and iii. have been achieved. I certify under penalty of law that this
document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting
false information, including the possibility of fine and imprisonment for knowing
violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 160 of 1493
Page 161
eNOT Qualified Inspector Certification – SMPs
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.iv. or CGP Part V.A.1.b.iv.
have been achieved. I certify under penalty of law that this document and all
attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 161 of 1493
Page 162
Page 162 of 1493
Page 163
Appendix c:
Project evaluation and
design calculations
Page 163 of 1493
Page 164
Page 164 of 1493
Page 165
P= 1.00 inch
Total Area Existing Imperv Proposed Imperv Existing Disturbed Imperv Reduction
AREA
(Acres) (Acres) (Acres) Imperv Area (Acres) (Acres)
TO ALTERNATIVE PRACTICES 2.13 0.47 1.91 0.47 0%
TO AREA REDUCTION SMPS
SITE REMAINING AREA 3.55 0.59 1.07 0.35 0%
TOTAL SITE 5.68 1.06 2.98 0.82 0%
Water Quality Volume Calculation
Exist Disturbed Imperv Imperv Area (NEW Percent TOTAL WQV
Total Area WQv WQv Adjusted
New Development / Redevelopment WQv Treatment % Area (REDEVELOPMENT) DEVELOPMENT) Impervious Rv REQUIRED System Generated Notes
(Acres) (ft 3 ) (ft 3 )
(Acres) (Acres) % (ft 3 )
REDEVELOPMENT ALTERNATIVE 75% 0.47 0.47 - 100% 0.95 1,621 1,216
NEW DEVELOPMENT ALTERNATIVE 100% 1.66 - 1.44 87% 0.83 5,006 5,006
8,672
REDEVELOPMENT REMAINING AREA 25% 0.35 0.35 - 100% 0.95 1,207 302
NEW DEVELOPMENT REMAINING AREA 100% 3.20 - 0.48 15% 0.19 2,149 2,149
Minimum Runoff Reduction Volume Calculation
Total Impervious Area Added Percent MINIMUM RRv
Weighted S
AREA (NEW DEVELOPMENT) Soil Group A % Soil Group B % Soil Group C % Soil Group D % Impervious Rv REQUIRED System Generated Notes
Factor 3
(Acres) % (ft )
TOTAL SITE 1.92 0% 0% 0% 100% 100% 0.95 0.20 1,324
Page 165 of 1493
Page 166
Page 166 of 1493
Page 167
Step 2 - Calculate Water Quality Volume
Is this project subject to Section 4.3 of the NYS Design Manual for Enhanced Phosphorus
Removal? No
What is the nature of this construction project? Redevelopment with increase in impervious area
Design Point: 1
Enter 90% Rainfall Event as P
P= 1.00 inches
Calculate Required WQv
Contributing Percent
Drainage Area Impervious Area WQv SMP
Area Impervious Rv
Number (Acres) (cf) Description
(Acres) %
Filtration
1 0.63 0.22 34 0.36 817
Bioretention
Flow Based
2 1.70 1.48 87 0.83 5,144 Alternative
Practice
Filtration
3 0.65 0.22 33 0.35 829
Bioretention
Filtration
4 0.68 0.48 71 0.69 1,692
Bioretention
Flow Based
5 0.43 0.43 100 0.95 1,483 Alternative
Practice
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Total 4.09 2.82 69 0.67 9964 Required WQv
Page 167 of 1493
Page 168
Page 168 of 1493
Page 169
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
1 0.63 0.22 34 0.36 817 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 340 sf
Enter Provided Filter Area Af 340 sf
Recalculated Water Quality Volume (based on
WQv calc 816 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 326 cf
This is the portion of the WQv that is not reduced in
WQv Treated 491 cf
the practice.
Page 169 of 1493
Page 170
Page 170 of 1493
Page 171
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
3 0.65 0.22 33 0.35 829 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 345 sf
Enter Provided Filter Area Af 348 sf
Recalculated Water Quality Volume (based on
WQv calc 835.2 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 334 cf
This is the portion of the WQv that is not reduced in
WQv Treated 495 cf
the practice.
Page 171 of 1493
Page 172
Page 172 of 1493
Page 173
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
4 0.68 0.48 71 0.69 1,692 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 705 sf
Enter Provided Filter Area Af 705 sf
Recalculated Water Quality Volume (based on
WQv calc 1692 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 677 cf
This is the portion of the WQv that is not reduced in
WQv Treated 1015 cf
the practice.
Page 173 of 1493
Page 174
Page 174 of 1493
Page 175
Water Quality Peak Flow Calclations
NYSDEC Water Quality Volume (WQv) & Water Quality Peak Flow (Qp) Calculation
Worksheet (REQUIRED Qp)
PROJECT INFORMATION
Total Drainage Area A: 2.09 ac
Impervious Area I: 1.90 ac
Percent Impervious 90.9 %
NYSDEC 90% Rainfall P: 1.00 in.
Time of Concentration Tc: 0.27 hrs
Rv: 0.87
WATER QUALITY VOLUME
Water Quality Volume WQv=([(P)*(Rv)*(A)]/12)*43560 WQv: 6,587 cf
WATER QUALITY PEAK FLOW (NEW DEVELOPMENT)
Runoff Volume Q=WQv/(A*3600) Q: 0.87 in.
2 ½
CN=1000/(10+5*P+10*Q-10(Q +1.25*Q*P) ) CN: 98.80
CN Rounded CN: 99
CN < or = 98 CN: 98
Initial Abstraction (Ia=200/CN-2) Ia: 0.04 in.
RATIO R=Ia/P R: 0.04
2
C0 = A*R +B*R +C C0: 2.54
2
C1 = A*R +B*R +C C1: -0.58
2
C2 = A*R +B*R +C C2: -0.17
2
Unit Peak Discharge qu=10^(C0+C1*Log(Tc)+C2*(log(Tc)) ) qu: 663.03 cfs/mi2/in
Water Quality Peak Flow Qp=qu*A*Q/640 (100%) Qp: 1.88 cfs
REDVELOPMENT
Impeverious Area Reduction IC 0.00 %
WQv Treatment by Standard Practice SP 0.00 %
Runoff Reduction RR 0.00 %
Req. WQv% By Alt. Practice AP=(25-(% IC+%SP+%RR))*3: AP 75.0 %
Required Water Quality Peak Flow RD QP=(Qp*AP): RD Qp: 1.41 cfs
Page 1 of 1
Page 175 of 1493
Page 176
Page 176 of 1493
Page 177
Appendix d:
Pre-development stormwater
modeling
Page 177 of 1493
Page 178
Page 178 of 1493
Page 179
ES-1
W Site
AP-1
Cayuga Creek
ES-2
E Site
Subcat Reach Pond Link Routing Diagram for D_App D_Pre-Development Model
Prepared by Labella Associates, Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC
Page 179 of 1493
Page 180
Page 180 of 1493
Page 181
D_App D_Pre-Development Model
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing (selected events)
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-yr NY-West Seneca 24-hr S1 1-yr Default 24.00 1 1.82 2
2 10-yr NY-West Seneca 24-hr S1 10-yr Default 24.00 1 3.14 2
3 100-yr NY-West Seneca 24-hr S1 100-yr Default 24.00 1 5.22 2
Page 181 of 1493
Page 182
D_App D_Pre-Development Model
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (selected nodes)
Area CN Description
(acres) (subcatchment-numbers)
10.061 80 >75% Grass cover, Good, HSG D (ES-1, ES-2)
1.056 98 Paved parking, HSG D (ES-1, ES-2)
11.117 82 TOTAL AREA
Page 182 of 1493
Page 183
D_App D_Pre-Development Model
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (selected nodes)
Area Soil Subcatchment
(acres) Group Numbers
0.000 HSG A
0.000 HSG B
0.000 HSG C
11.117 HSG D ES-1, ES-2
0.000 Other
11.117 TOTAL AREA
Page 183 of 1493
Page 184
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 5
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=0.53"
Flow Length=391' Tc=14.0 min CN=82 Runoff=4.22 cfs 0.344 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=0.49"
Flow Length=390' Tc=19.4 min CN=81 Runoff=1.42 cfs 0.139 af
Reach AP-1: Cayuga Creek Inflow=5.48 cfs 0.483 af
Outflow=5.48 cfs 0.483 af
Total Runoff Area = 11.117 ac Runoff Volume = 0.483 af Average Runoff Depth = 0.52"
90.50% Pervious = 10.061 ac 9.50% Impervious = 1.056 ac
Page 184 of 1493
Page 185
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 6
Summary for Subcatchment ES-1: W Site
Runoff = 4.22 cfs @ 12.16 hrs, Volume= 0.344 af, Depth= 0.53"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
Runoff
4.22 cfs
NY-West Seneca 24-hr S1 1-yr
4
Rainfall=1.82"
Runoff Area=337,194 sf
Runoff Volume=0.344 af
3
Runoff Depth=0.53"
Flow (cfs)
Flow Length=391'
Tc=14.0 min
2
CN=82
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 185 of 1493
Page 186
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment ES-2: E Site
Runoff = 1.42 cfs @ 12.25 hrs, Volume= 0.139 af, Depth= 0.49"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
1.42 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
Runoff Area=147,058 sf
Runoff Volume=0.139 af
1
Runoff Depth=0.49"
Flow (cfs)
Flow Length=390'
Tc=19.4 min
CN=81
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 186 of 1493
Page 187
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Reach AP-1: Cayuga Creek
Inflow Area = 11.117 ac, 9.50% Impervious, Inflow Depth = 0.52" for 1-yr event
Inflow = 5.48 cfs @ 12.18 hrs, Volume= 0.483 af
Outflow = 5.48 cfs @ 12.18 hrs, Volume= 0.483 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
5.48 cfs Outflow
6 5.48 cfs
Inflow Area=11.117 ac
5
4
Flow (cfs)
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 187 of 1493
Page 188
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 9
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=1.49"
Flow Length=391' Tc=14.0 min CN=82 Runoff=12.32 cfs 0.961 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=1.42"
Flow Length=390' Tc=19.4 min CN=81 Runoff=4.40 cfs 0.400 af
Reach AP-1: Cayuga Creek Inflow=16.27 cfs 1.361 af
Outflow=16.27 cfs 1.361 af
Total Runoff Area = 11.117 ac Runoff Volume = 1.361 af Average Runoff Depth = 1.47"
90.50% Pervious = 10.061 ac 9.50% Impervious = 1.056 ac
Page 188 of 1493
Page 189
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment ES-1: W Site
Runoff = 12.32 cfs @ 12.15 hrs, Volume= 0.961 af, Depth= 1.49"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
Runoff
13 12.32 cfs
12 NY-West Seneca 24-hr S1 10-yr
11 Rainfall=3.14"
10
Runoff Area=337,194 sf
Runoff Volume=0.961 af
9
Runoff Depth=1.49"
8
Flow (cfs)
Flow Length=391'
7
Tc=14.0 min
6
CN=82
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 189 of 1493
Page 190
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment ES-2: E Site
Runoff = 4.40 cfs @ 12.23 hrs, Volume= 0.400 af, Depth= 1.42"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
4.40 cfs
NY-West Seneca 24-hr S1 10-yr
4 Rainfall=3.14"
Runoff Area=147,058 sf
Runoff Volume=0.400 af
3 Runoff Depth=1.42"
Flow (cfs)
Flow Length=390'
Tc=19.4 min
2 CN=81
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 190 of 1493
Page 191
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 12
Summary for Reach AP-1: Cayuga Creek
Inflow Area = 11.117 ac, 9.50% Impervious, Inflow Depth = 1.47" for 10-yr event
Inflow = 16.27 cfs @ 12.17 hrs, Volume= 1.361 af
Outflow = 16.27 cfs @ 12.17 hrs, Volume= 1.361 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
18 16.27 cfs Outflow
16.27 cfs
17
16
Inflow Area=11.117 ac
15
14
13
12
11
Flow (cfs)
10
9
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 191 of 1493
Page 192
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 13
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=3.28"
Flow Length=391' Tc=14.0 min CN=82 Runoff=27.59 cfs 2.114 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=3.18"
Flow Length=390' Tc=19.4 min CN=81 Runoff=10.17 cfs 0.895 af
Reach AP-1: Cayuga Creek Inflow=36.80 cfs 3.008 af
Outflow=36.80 cfs 3.008 af
Total Runoff Area = 11.117 ac Runoff Volume = 3.008 af Average Runoff Depth = 3.25"
90.50% Pervious = 10.061 ac 9.50% Impervious = 1.056 ac
Page 192 of 1493
Page 193
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 14
Summary for Subcatchment ES-1: W Site
Runoff = 27.59 cfs @ 12.15 hrs, Volume= 2.114 af, Depth= 3.28"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
30 Runoff
27.59 cfs
28
NY-West Seneca 24-hr S1 100-yr
26
Rainfall=5.22"
24
Runoff Area=337,194 sf
22
Runoff Volume=2.114 af
20
Runoff Depth=3.28"
18
Flow Length=391'
Flow (cfs)
16
Tc=14.0 min
14
CN=82
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 193 of 1493
Page 194
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 15
Summary for Subcatchment ES-2: E Site
Runoff = 10.17 cfs @ 12.22 hrs, Volume= 0.895 af, Depth= 3.18"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
11 10.17 cfs
10 NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
9
Runoff Area=147,058 sf
8 Runoff Volume=0.895 af
7 Runoff Depth=3.18"
Flow Length=390'
Flow (cfs)
6
Tc=19.4 min
5 CN=81
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 194 of 1493
Page 195
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 16
Summary for Reach AP-1: Cayuga Creek
Inflow Area = 11.117 ac, 9.50% Impervious, Inflow Depth = 3.25" for 100-yr event
Inflow = 36.80 cfs @ 12.16 hrs, Volume= 3.008 af
Outflow = 36.80 cfs @ 12.16 hrs, Volume= 3.008 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
36.80 cfs Outflow
40 36.80 cfs
38
36
Inflow Area=11.117 ac
34
32
30
28
26
24
Flow (cfs)
22
20
18
16
14
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 195 of 1493
Page 196
D_App D_Pre-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 17
Events for Subcatchment ES-1: W Site
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 4.22 0.344 0.53
10-yr 3.14 12.32 0.961 1.49
100-yr 5.22 27.59 2.114 3.28
Page 196 of 1493
Page 197
D_App D_Pre-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 18
Events for Subcatchment ES-2: E Site
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 1.42 0.139 0.49
10-yr 3.14 4.40 0.400 1.42
100-yr 5.22 10.17 0.895 3.18
Page 197 of 1493
Page 198
D_App D_Pre-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 19
Events for Reach AP-1: Cayuga Creek
Event Inflow Outflow Elevation Storage
(cfs) (cfs) (feet) (cubic-feet)
1-yr 5.48 5.48 0.00 0
10-yr 16.27 16.27 0.00 0
100-yr 36.80 36.80 0.00 0
Page 198 of 1493
Page 199
Appendix e:
Post development stormwater
modeling
Page 199 of 1493
Page 200
Page 200 of 1493
Page 201
PS-1 BIO-1
Filtration Bioretention
PS-6
PS-2
CH-1 DP-1 PS-7
Chambers Design Point
PS-5
PS-8
PS-3 BIO-2
Filtration Bioretention
PS-4 BIO-3
Filtration Bioretention
Subcat Reach Pond Link Routing Diagram for E_App E_Post-Development Model
Prepared by Labella Associates, Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC
Page 201 of 1493
Page 202
E_App E_Post-Development Model
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing (selected events)
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-yr NY-West Seneca 24-hr S1 1-yr Default 24.00 1 1.82 2
2 10-yr NY-West Seneca 24-hr S1 10-yr Default 24.00 1 3.14 2
3 100-yr NY-West Seneca 24-hr S1 100-yr Default 24.00 1 5.22 2
Page 202 of 1493
Page 203
E_App E_Post-Development Model
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (selected nodes)
Area CN Description
(acres) (subcatchment-numbers)
8.107 80 >75% Grass cover, Good, HSG D (PS-1, PS-2, PS-3, PS-4, PS-7, PS-8)
2.967 98 Paved parking, HSG D (PS-1, PS-2, PS-3, PS-4, PS-5, PS-6)
11.074 85 TOTAL AREA
Page 203 of 1493
Page 204
E_App E_Post-Development Model
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (selected nodes)
Area Soil Subcatchment
(acres) Group Numbers
0.000 HSG A
0.000 HSG B
0.000 HSG C
11.074 HSG D PS-1, PS-2, PS-3, PS-4, PS-5, PS-6, PS-7, PS-8
0.000 Other
11.074 TOTAL AREA
Page 204 of 1493
Page 205
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 5
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=27,596 sf 33.98% Impervious Runoff Depth=0.72"
Tc=6.0 min CN=86 Runoff=0.72 cfs 0.038 af
Subcatchment PS-2: Runoff Area=72,316 sf 88.61% Impervious Runoff Depth=1.40"
Tc=6.0 min CN=96 Runoff=3.74 cfs 0.194 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=0.72"
Tc=6.0 min CN=86 Runoff=0.74 cfs 0.039 af
Subcatchment PS-4: Runoff Area=29,485 sf 70.98% Impervious Runoff Depth=1.15"
Tc=6.0 min CN=93 Runoff=1.28 cfs 0.065 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=1.60"
Tc=6.0 min CN=98 Runoff=1.06 cfs 0.057 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=1.60"
Tc=6.0 min CN=98 Runoff=0.37 cfs 0.020 af
Subcatchment PS-7: Runoff Area=245,856 sf 0.00% Impervious Runoff Depth=0.46"
Flow Length=391' Tc=14.0 min CN=80 Runoff=2.49 cfs 0.215 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=0.46"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=0.40 cfs 0.047 af
Reach DP-1: Design Point Inflow=4.12 cfs 0.674 af
Outflow=4.12 cfs 0.674 af
Pond BIO-1: Filtration Bioretention Peak Elev=598.98' Storage=994 cf Inflow=0.72 cfs 0.038 af
Primary=0.02 cfs 0.038 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.02 cfs 0.038 af
Pond BIO-2: Filtration Bioretention Peak Elev=596.95' Storage=1,010 cf Inflow=0.74 cfs 0.039 af
Primary=0.02 cfs 0.039 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.02 cfs 0.039 af
Pond BIO-3: Filtration Bioretention Peak Elev=595.92' Storage=1,729 cf Inflow=1.28 cfs 0.065 af
Primary=0.04 cfs 0.065 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.04 cfs 0.065 af
Pond CH-1: Chambers Peak Elev=592.38' Storage=0.079 af Inflow=4.80 cfs 0.251 af
8.0" Round Culvert n=0.013 L=25.0' S=0.0100 '/' Outflow=1.18 cfs 0.251 af
Total Runoff Area = 11.074 ac Runoff Volume = 0.674 af Average Runoff Depth = 0.73"
73.21% Pervious = 8.107 ac 26.79% Impervious = 2.967 ac
Page 205 of 1493
Page 206
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 6
Summary for Subcatchment PS-1:
Runoff = 0.72 cfs @ 12.04 hrs, Volume= 0.038 af, Depth= 0.72"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
9,376 98 Paved parking, HSG D
18,220 80 >75% Grass cover, Good, HSG D
27,596 86 Weighted Average
18,220 66.02% Pervious Area
9,376 33.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
0.8 Runoff
0.75
0.72 cfs
0.7 NY-West Seneca 24-hr S1 1-yr
0.65 Rainfall=1.82"
0.6 Runoff Area=27,596 sf
0.55 Runoff Volume=0.038 af
0.5 Runoff Depth=0.72"
Flow (cfs)
0.45 Tc=6.0 min
0.4
CN=86
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 206 of 1493
Page 207
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment PS-2:
Runoff = 3.74 cfs @ 12.04 hrs, Volume= 0.194 af, Depth= 1.40"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
64,081 98 Paved parking, HSG D
8,235 80 >75% Grass cover, Good, HSG D
72,316 96 Weighted Average
8,235 11.39% Pervious Area
64,081 88.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
Runoff
4 3.74 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
3
Runoff Area=72,316 sf
Runoff Volume=0.194 af
Runoff Depth=1.40"
Flow (cfs)
Tc=6.0 min
2
CN=96
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 207 of 1493
Page 208
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment PS-3:
Runoff = 0.74 cfs @ 12.04 hrs, Volume= 0.039 af, Depth= 0.72"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
0.8 Runoff
0.74 cfs
0.75
NY-West Seneca 24-hr S1 1-yr
0.7
Rainfall=1.82"
0.65
0.6
Runoff Area=28,267 sf
0.55 Runoff Volume=0.039 af
0.5 Runoff Depth=0.72"
Flow (cfs)
0.45 Tc=6.0 min
0.4 CN=86
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 208 of 1493
Page 209
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 9
Summary for Subcatchment PS-4:
Runoff = 1.28 cfs @ 12.04 hrs, Volume= 0.065 af, Depth= 1.15"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
8,557 80 >75% Grass cover, Good, HSG D
29,485 93 Weighted Average
8,557 29.02% Pervious Area
20,928 70.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
1.28 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
Runoff Area=29,485 sf
1
Runoff Volume=0.065 af
Runoff Depth=1.15"
Flow (cfs)
Tc=6.0 min
CN=93
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 209 of 1493
Page 210
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment PS-5:
Runoff = 1.06 cfs @ 12.04 hrs, Volume= 0.057 af, Depth= 1.60"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
1.06 cfs
NY-West Seneca 24-hr S1 1-yr
1
Rainfall=1.82"
Runoff Area=18,756 sf
Runoff Volume=0.057 af
Runoff Depth=1.60"
Flow (cfs)
Tc=6.0 min
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 210 of 1493
Page 211
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment PS-6:
Runoff = 0.37 cfs @ 12.04 hrs, Volume= 0.020 af, Depth= 1.60"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
0.4 0.37 cfs
0.38
0.36
NY-West Seneca 24-hr S1 1-yr
0.34 Rainfall=1.82"
0.32
Runoff Area=6,622 sf
0.3
0.28 Runoff Volume=0.020 af
0.26 Runoff Depth=1.60"
0.24
Flow (cfs)
0.22
Tc=6.0 min
0.2 CN=98
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 211 of 1493
Page 212
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 12
Summary for Subcatchment PS-7:
Runoff = 2.49 cfs @ 12.17 hrs, Volume= 0.215 af, Depth= 0.46"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
245,856 80 >75% Grass cover, Good, HSG D
245,856 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
Runoff
2.49 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
2
Runoff Area=245,856 sf
Runoff Volume=0.215 af
Runoff Depth=0.46"
Flow (cfs)
Flow Length=391'
Tc=14.0 min
1
CN=80
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 212 of 1493
Page 213
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 13
Summary for Subcatchment PS-8:
Runoff = 0.40 cfs @ 12.36 hrs, Volume= 0.047 af, Depth= 0.46"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
0.44 Runoff
0.42
0.40 cfs
0.4 NY-West Seneca 24-hr S1 1-yr
0.38
0.36 Rainfall=1.82"
0.34 Runoff Area=53,474 sf
0.32
0.3 Runoff Volume=0.047 af
0.28 Runoff Depth=0.46"
0.26
Flow (cfs)
0.24 Flow Length=821'
0.22 Slope=0.0100 '/'
0.2
0.18 Tc=25.7 min
0.16 CN=80
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 213 of 1493
Page 214
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 14
Summary for Reach DP-1: Design Point
Inflow Area = 11.074 ac, 26.79% Impervious, Inflow Depth = 0.73" for 1-yr event
Inflow = 4.12 cfs @ 12.18 hrs, Volume= 0.674 af
Outflow = 4.12 cfs @ 12.18 hrs, Volume= 0.674 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
4.12 cfs Outflow
4.12 cfs
Inflow Area=11.074 ac
4
3
Flow (cfs)
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 214 of 1493
Page 215
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 15
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.634 ac, 33.98% Impervious, Inflow Depth = 0.72" for 1-yr event
Inflow = 0.72 cfs @ 12.04 hrs, Volume= 0.038 af
Outflow = 0.02 cfs @ 15.87 hrs, Volume= 0.038 af, Atten= 97%, Lag= 229.9 min
Primary = 0.02 cfs @ 15.87 hrs, Volume= 0.038 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 598.98' @ 15.87 hrs Surf.Area= 1,679 sf Storage= 994 cf
Flood Elev= 600.00' Surf.Area= 2,500 sf Storage= 3,120 cf
Plug-Flow detention time= 645.9 min calculated for 0.038 af (100% of inflow)
Center-of-Mass det. time= 646.0 min ( 1,495.6 - 849.7 )
Volume Invert Avail.Storage Storage Description
#1 598.00' 3,120 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
598.00 340 0 0
599.00 1,700 1,020 1,020
600.00 2,500 2,100 3,120
Device Routing Invert Outlet Devices
#1 Primary 598.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 15.87 hrs HW=598.98' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.00 cfs of 5.10 cfs potential flow)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 215 of 1493
Page 216
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 16
Pond BIO-1: Filtration Bioretention
Hydrograph
0.72 cfs Inflow
Outflow
Inflow Area=0.634 ac Primary
Secondary
Tertiary
0.8
0.75
Peak Elev=598.98'
0.7 Storage=994 cf
0.65
0.6
0.55
0.5
Flow (cfs)
0.45
0.4
0.35
0.3
0.25
0.2 0.02 cfs
0.15 0.02 cfs
0.1 0.00 cfs
0.00 cfs
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 216 of 1493
Page 217
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 17
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 0.72" for 1-yr event
Inflow = 0.74 cfs @ 12.04 hrs, Volume= 0.039 af
Outflow = 0.02 cfs @ 15.70 hrs, Volume= 0.039 af, Atten= 97%, Lag= 219.6 min
Primary = 0.02 cfs @ 15.70 hrs, Volume= 0.039 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.95' @ 15.70 hrs Surf.Area= 1,776 sf Storage= 1,010 cf
Flood Elev= 598.00' Surf.Area= 2,630 sf Storage= 3,339 cf
Plug-Flow detention time= 621.3 min calculated for 0.039 af (100% of inflow)
Center-of-Mass det. time= 621.4 min ( 1,471.1 - 849.7 )
Volume Invert Avail.Storage Storage Description
#1 596.00' 3,339 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
596.00 348 0 0
597.00 1,850 1,099 1,099
598.00 2,630 2,240 3,339
Device Routing Invert Outlet Devices
#1 Primary 596.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 15.70 hrs HW=596.95' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.00 cfs of 4.75 cfs potential flow)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 217 of 1493
Page 218
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 18
Pond BIO-2: Filtration Bioretention
Hydrograph
0.74 cfs Inflow
Outflow
Inflow Area=0.649 ac Primary
Secondary
Tertiary
0.8 Peak Elev=596.95'
0.75
0.7 Storage=1,010 cf
0.65
0.6
0.55
0.5
Flow (cfs)
0.45
0.4
0.35
0.3
0.25
0.2 0.02 cfs
0.15 0.02 cfs
0.1 0.00 cfs
0.00 cfs
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 218 of 1493
Page 219
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 19
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.677 ac, 70.98% Impervious, Inflow Depth = 1.15" for 1-yr event
Inflow = 1.28 cfs @ 12.04 hrs, Volume= 0.065 af
Outflow = 0.04 cfs @ 14.68 hrs, Volume= 0.065 af, Atten= 97%, Lag= 158.5 min
Primary = 0.04 cfs @ 14.68 hrs, Volume= 0.065 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 595.92' @ 14.68 hrs Surf.Area= 3,049 sf Storage= 1,729 cf
Flood Elev= 597.00' Surf.Area= 3,978 sf Storage= 5,592 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 587.3 min ( 1,401.4 - 814.2 )
Volume Invert Avail.Storage Storage Description
#1 595.00' 5,592 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
595.00 705 0 0
596.00 3,250 1,978 1,978
597.00 3,978 3,614 5,592
Device Routing Invert Outlet Devices
#1 Primary 595.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.04 cfs @ 14.68 hrs HW=595.92' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.00 cfs of 5.10 cfs potential flow)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 219 of 1493
Page 220
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 20
Pond BIO-3: Filtration Bioretention
Hydrograph
1.28 cfs Inflow
Outflow
Inflow Area=0.677 ac Primary
Secondary
Tertiary
Peak Elev=595.92'
Storage=1,729 cf
1
Flow (cfs)
0.04 cfs
0.04 cfs
0.00 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 220 of 1493
Page 221
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 21
Summary for Pond CH-1: Chambers
Inflow Area = 2.091 ac, 90.96% Impervious, Inflow Depth = 1.44" for 1-yr event
Inflow = 4.80 cfs @ 12.04 hrs, Volume= 0.251 af
Outflow = 1.18 cfs @ 12.29 hrs, Volume= 0.251 af, Atten= 75%, Lag= 15.4 min
Primary = 1.18 cfs @ 12.29 hrs, Volume= 0.251 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 592.38' @ 12.29 hrs Surf.Area= 0.127 ac Storage= 0.079 af
Flood Elev= 598.32' Surf.Area= 0.127 ac Storage= 0.433 af
Plug-Flow detention time= 60.5 min calculated for 0.251 af (100% of inflow)
Center-of-Mass det. time= 60.2 min ( 847.2 - 787.0 )
Volume Invert Avail.Storage Storage Description
#1A 591.25' 0.177 af 37.08'W x 149.10'L x 5.50'H Field A
0.698 af Overall - 0.256 af Embedded = 0.442 af x 40.0% Voids
#2A 592.00' 0.256 af ADS_StormTech MC-3500 d +Cap x 100 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
100 Chambers in 5 Rows
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
0.433 af Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
#1 Primary 591.25' 8.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.25' / 591.00' S= 0.0100 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=1.18 cfs @ 12.29 hrs HW=592.38' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 1.18 cfs @ 3.38 fps)
Page 221 of 1493
Page 222
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 22
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
5 Rows x 77.0" Wide + 9.0" Spacing x 4 + 12.0" Side Stone x 2 = 37.08' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
100 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 5 Rows = 11,144.2 cf Chamber Storage
30,410.2 cf Field - 11,144.2 cf Chambers = 19,266.0 cf Stone x 40.0% Voids = 7,706.4 cf Stone Storage
Chamber Storage + Stone Storage = 18,850.6 cf = 0.433 af
Overall Storage Efficiency = 62.0%
Overall System Size = 149.10' x 37.08' x 5.50'
100 Chambers
1,126.3 cy Field
713.6 cy Stone
Page 222 of 1493
Page 223
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 23
Pond CH-1: Chambers
Hydrograph
Inflow
4.80 cfs Primary
5
Inflow Area=2.091 ac
Peak Elev=592.38'
4
Storage=0.079 af
8.0"
Flow (cfs)
3
Round Culvert
n=0.013
2
L=25.0'
1.18 cfs
S=0.0100 '/'
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 223 of 1493
Page 224
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 24
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=27,596 sf 33.98% Impervious Runoff Depth=1.78"
Tc=6.0 min CN=86 Runoff=1.71 cfs 0.094 af
Subcatchment PS-2: Runoff Area=72,316 sf 88.61% Impervious Runoff Depth=2.69"
Tc=6.0 min CN=96 Runoff=6.39 cfs 0.372 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=1.78"
Tc=6.0 min CN=86 Runoff=1.75 cfs 0.096 af
Subcatchment PS-4: Runoff Area=29,485 sf 70.98% Impervious Runoff Depth=2.39"
Tc=6.0 min CN=93 Runoff=2.39 cfs 0.135 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=2.91"
Tc=6.0 min CN=98 Runoff=1.72 cfs 0.104 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=2.91"
Tc=6.0 min CN=98 Runoff=0.61 cfs 0.037 af
Subcatchment PS-7: Runoff Area=245,856 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=391' Tc=14.0 min CN=80 Runoff=8.08 cfs 0.638 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=1.32 cfs 0.139 af
Reach DP-1: Design Point Inflow=13.96 cfs 1.615 af
Outflow=13.96 cfs 1.615 af
Pond BIO-1: Filtration Bioretention Peak Elev=599.12' Storage=1,232 cf Inflow=1.71 cfs 0.094 af
Primary=0.02 cfs 0.045 af Secondary=1.10 cfs 0.049 af Tertiary=0.00 cfs 0.000 af Outflow=1.12 cfs 0.094 af
Pond BIO-2: Filtration Bioretention Peak Elev=597.12' Storage=1,319 cf Inflow=1.75 cfs 0.096 af
Primary=0.02 cfs 0.048 af Secondary=1.04 cfs 0.048 af Tertiary=0.00 cfs 0.000 af Outflow=1.06 cfs 0.096 af
Pond BIO-3: Filtration Bioretention Peak Elev=596.12' Storage=2,359 cf Inflow=2.39 cfs 0.135 af
Primary=0.04 cfs 0.084 af Secondary=1.03 cfs 0.050 af Tertiary=0.00 cfs 0.000 af Outflow=1.07 cfs 0.135 af
Pond CH-1: Chambers Peak Elev=593.15' Storage=0.161 af Inflow=8.11 cfs 0.476 af
8.0" Round Culvert n=0.013 L=25.0' S=0.0100 '/' Outflow=1.66 cfs 0.476 af
Total Runoff Area = 11.074 ac Runoff Volume = 1.615 af Average Runoff Depth = 1.75"
73.21% Pervious = 8.107 ac 26.79% Impervious = 2.967 ac
Page 224 of 1493
Page 225
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 25
Summary for Subcatchment PS-1:
Runoff = 1.71 cfs @ 12.04 hrs, Volume= 0.094 af, Depth= 1.78"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
9,376 98 Paved parking, HSG D
18,220 80 >75% Grass cover, Good, HSG D
27,596 86 Weighted Average
18,220 66.02% Pervious Area
9,376 33.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
Runoff
1.71 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=27,596 sf
Runoff Volume=0.094 af
Runoff Depth=1.78"
Flow (cfs)
1
Tc=6.0 min
CN=86
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 225 of 1493
Page 226
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 26
Summary for Subcatchment PS-2:
Runoff = 6.39 cfs @ 12.04 hrs, Volume= 0.372 af, Depth= 2.69"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
64,081 98 Paved parking, HSG D
8,235 80 >75% Grass cover, Good, HSG D
72,316 96 Weighted Average
8,235 11.39% Pervious Area
64,081 88.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
7 Runoff
6.39 cfs
NY-West Seneca 24-hr S1 10-yr
6
Rainfall=3.14"
Runoff Area=72,316 sf
5
Runoff Volume=0.372 af
Runoff Depth=2.69"
Flow (cfs)
4
Tc=6.0 min
CN=96
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 226 of 1493
Page 227
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 27
Summary for Subcatchment PS-3:
Runoff = 1.75 cfs @ 12.04 hrs, Volume= 0.096 af, Depth= 1.78"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
Runoff
1.75 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=28,267 sf
Runoff Volume=0.096 af
Runoff Depth=1.78"
Flow (cfs)
Tc=6.0 min
1
CN=86
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 227 of 1493
Page 228
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 28
Summary for Subcatchment PS-4:
Runoff = 2.39 cfs @ 12.04 hrs, Volume= 0.135 af, Depth= 2.39"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
8,557 80 >75% Grass cover, Good, HSG D
29,485 93 Weighted Average
8,557 29.02% Pervious Area
20,928 70.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
2.39 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
2 Runoff Area=29,485 sf
Runoff Volume=0.135 af
Runoff Depth=2.39"
Flow (cfs)
Tc=6.0 min
CN=93
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 228 of 1493
Page 229
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 29
Summary for Subcatchment PS-5:
Runoff = 1.72 cfs @ 12.04 hrs, Volume= 0.104 af, Depth= 2.91"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
1.72 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=18,756 sf
Runoff Volume=0.104 af
Runoff Depth=2.91"
Flow (cfs)
1
Tc=6.0 min
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 229 of 1493
Page 230
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 30
Summary for Subcatchment PS-6:
Runoff = 0.61 cfs @ 12.04 hrs, Volume= 0.037 af, Depth= 2.91"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
0.65 0.61 cfs
0.6 NY-West Seneca 24-hr S1 10-yr
0.55 Rainfall=3.14"
0.5 Runoff Area=6,622 sf
0.45 Runoff Volume=0.037 af
0.4
Runoff Depth=2.91"
Flow (cfs)
Tc=6.0 min
0.35
CN=98
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 230 of 1493
Page 231
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 31
Summary for Subcatchment PS-7:
Runoff = 8.08 cfs @ 12.15 hrs, Volume= 0.638 af, Depth= 1.36"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
245,856 80 >75% Grass cover, Good, HSG D
245,856 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
9 Runoff
8.08 cfs
8 NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
7
Runoff Area=245,856 sf
6 Runoff Volume=0.638 af
Runoff Depth=1.36"
Flow (cfs)
5 Flow Length=391'
Tc=14.0 min
4
CN=80
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 231 of 1493
Page 232
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 32
Summary for Subcatchment PS-8:
Runoff = 1.32 cfs @ 12.32 hrs, Volume= 0.139 af, Depth= 1.36"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
Runoff
1.32 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=53,474 sf
1 Runoff Volume=0.139 af
Runoff Depth=1.36"
Flow (cfs)
Flow Length=821'
Slope=0.0100 '/'
Tc=25.7 min
CN=80
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 232 of 1493
Page 233
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 33
Summary for Reach DP-1: Design Point
Inflow Area = 11.074 ac, 26.79% Impervious, Inflow Depth = 1.75" for 10-yr event
Inflow = 13.96 cfs @ 12.15 hrs, Volume= 1.615 af
Outflow = 13.96 cfs @ 12.15 hrs, Volume= 1.615 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
13.96 cfs Outflow
15 13.96 cfs
14 Inflow Area=11.074 ac
13
12
11
10
9
Flow (cfs)
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 233 of 1493
Page 234
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 34
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.634 ac, 33.98% Impervious, Inflow Depth = 1.78" for 10-yr event
Inflow = 1.71 cfs @ 12.04 hrs, Volume= 0.094 af
Outflow = 1.12 cfs @ 12.12 hrs, Volume= 0.094 af, Atten= 34%, Lag= 4.6 min
Primary = 0.02 cfs @ 12.12 hrs, Volume= 0.045 af
Routed to Reach DP-1 : Design Point
Secondary = 1.10 cfs @ 12.12 hrs, Volume= 0.049 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 599.12' @ 12.12 hrs Surf.Area= 1,797 sf Storage= 1,232 cf
Flood Elev= 600.00' Surf.Area= 2,500 sf Storage= 3,120 cf
Plug-Flow detention time= 326.2 min calculated for 0.094 af (100% of inflow)
Center-of-Mass det. time= 326.4 min ( 1,148.5 - 822.1 )
Volume Invert Avail.Storage Storage Description
#1 598.00' 3,120 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
598.00 340 0 0
599.00 1,700 1,020 1,020
600.00 2,500 2,100 3,120
Device Routing Invert Outlet Devices
#1 Primary 598.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.12 hrs HW=599.12' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=1.10 cfs @ 12.12 hrs HW=599.12' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 1.10 cfs of 6.00 cfs potential flow)
2=Overflow Grate (Weir Controls 1.10 cfs @ 1.14 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 234 of 1493
Page 235
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 35
Pond BIO-1: Filtration Bioretention
Hydrograph
1.71 cfs Inflow
Outflow
Inflow Area=0.634 ac Primary
Secondary
Tertiary
Peak Elev=599.12'
Storage=1,232 cf
1.12 cfs
1.10 cfs
Flow (cfs)
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 235 of 1493
Page 236
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 36
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 1.78" for 10-yr event
Inflow = 1.75 cfs @ 12.04 hrs, Volume= 0.096 af
Outflow = 1.06 cfs @ 12.13 hrs, Volume= 0.096 af, Atten= 39%, Lag= 5.6 min
Primary = 0.02 cfs @ 12.13 hrs, Volume= 0.048 af
Routed to Reach DP-1 : Design Point
Secondary = 1.04 cfs @ 12.13 hrs, Volume= 0.048 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 597.12' @ 12.13 hrs Surf.Area= 1,941 sf Storage= 1,319 cf
Flood Elev= 598.00' Surf.Area= 2,630 sf Storage= 3,339 cf
Plug-Flow detention time= 339.7 min calculated for 0.096 af (100% of inflow)
Center-of-Mass det. time= 339.9 min ( 1,162.0 - 822.1 )
Volume Invert Avail.Storage Storage Description
#1 596.00' 3,339 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
596.00 348 0 0
597.00 1,850 1,099 1,099
598.00 2,630 2,240 3,339
Device Routing Invert Outlet Devices
#1 Primary 596.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.13 hrs HW=597.12' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=1.04 cfs @ 12.13 hrs HW=597.12' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 1.04 cfs of 5.54 cfs potential flow)
2=Overflow Grate (Weir Controls 1.04 cfs @ 1.11 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 236 of 1493
Page 237
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 37
Pond BIO-2: Filtration Bioretention
Hydrograph
1.75 cfs Inflow
Outflow
Inflow Area=0.649 ac Primary
Secondary
Tertiary
Peak Elev=597.12'
Storage=1,319 cf
1.06 cfs
1.04 cfs
Flow (cfs)
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 237 of 1493
Page 238
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 38
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.677 ac, 70.98% Impervious, Inflow Depth = 2.39" for 10-yr event
Inflow = 2.39 cfs @ 12.04 hrs, Volume= 0.135 af
Outflow = 1.07 cfs @ 12.18 hrs, Volume= 0.135 af, Atten= 55%, Lag= 8.6 min
Primary = 0.04 cfs @ 12.18 hrs, Volume= 0.084 af
Routed to Reach DP-1 : Design Point
Secondary = 1.03 cfs @ 12.18 hrs, Volume= 0.050 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.12' @ 12.18 hrs Surf.Area= 3,334 sf Storage= 2,359 cf
Flood Elev= 597.00' Surf.Area= 3,978 sf Storage= 5,592 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 411.1 min ( 1,203.9 - 792.8 )
Volume Invert Avail.Storage Storage Description
#1 595.00' 5,592 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
595.00 705 0 0
596.00 3,250 1,978 1,978
597.00 3,978 3,614 5,592
Device Routing Invert Outlet Devices
#1 Primary 595.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.04 cfs @ 12.18 hrs HW=596.12' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=1.03 cfs @ 12.18 hrs HW=596.12' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 1.03 cfs of 6.00 cfs potential flow)
2=Overflow Grate (Weir Controls 1.03 cfs @ 1.11 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 238 of 1493
Page 239
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 39
Pond BIO-3: Filtration Bioretention
Hydrograph
2.39 cfs Inflow
Outflow
Inflow Area=0.677 ac Primary
Secondary
Tertiary
Peak Elev=596.12'
Storage=2,359 cf
2
1.07 cfs
Flow (cfs)
1.03 cfs
1
0.04 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 239 of 1493
Page 240
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 40
Summary for Pond CH-1: Chambers
Inflow Area = 2.091 ac, 90.96% Impervious, Inflow Depth = 2.73" for 10-yr event
Inflow = 8.11 cfs @ 12.04 hrs, Volume= 0.476 af
Outflow = 1.66 cfs @ 12.48 hrs, Volume= 0.476 af, Atten= 80%, Lag= 26.9 min
Primary = 1.66 cfs @ 12.48 hrs, Volume= 0.476 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 593.15' @ 12.48 hrs Surf.Area= 0.127 ac Storage= 0.161 af
Flood Elev= 598.32' Surf.Area= 0.127 ac Storage= 0.433 af
Plug-Flow detention time= 60.0 min calculated for 0.476 af (100% of inflow)
Center-of-Mass det. time= 59.7 min ( 829.9 - 770.2 )
Volume Invert Avail.Storage Storage Description
#1A 591.25' 0.177 af 37.08'W x 149.10'L x 5.50'H Field A
0.698 af Overall - 0.256 af Embedded = 0.442 af x 40.0% Voids
#2A 592.00' 0.256 af ADS_StormTech MC-3500 d +Cap x 100 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
100 Chambers in 5 Rows
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
0.433 af Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
#1 Primary 591.25' 8.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.25' / 591.00' S= 0.0100 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=1.66 cfs @ 12.48 hrs HW=593.15' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 1.66 cfs @ 4.75 fps)
Page 240 of 1493
Page 241
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 41
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
5 Rows x 77.0" Wide + 9.0" Spacing x 4 + 12.0" Side Stone x 2 = 37.08' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
100 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 5 Rows = 11,144.2 cf Chamber Storage
30,410.2 cf Field - 11,144.2 cf Chambers = 19,266.0 cf Stone x 40.0% Voids = 7,706.4 cf Stone Storage
Chamber Storage + Stone Storage = 18,850.6 cf = 0.433 af
Overall Storage Efficiency = 62.0%
Overall System Size = 149.10' x 37.08' x 5.50'
100 Chambers
1,126.3 cy Field
713.6 cy Stone
Page 241 of 1493
Page 242
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 42
Pond CH-1: Chambers
Hydrograph
Inflow
9 8.11 cfs Primary
8
Inflow Area=2.091 ac
Peak Elev=593.15'
7
Storage=0.161 af
6
8.0"
Flow (cfs)
5
Round Culvert
4 n=0.013
3 L=25.0'
2
1.66 cfs S=0.0100 '/'
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 242 of 1493
Page 243
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 43
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=27,596 sf 33.98% Impervious Runoff Depth=3.67"
Tc=6.0 min CN=86 Runoff=3.44 cfs 0.194 af
Subcatchment PS-2: Runoff Area=72,316 sf 88.61% Impervious Runoff Depth=4.75"
Tc=6.0 min CN=96 Runoff=10.80 cfs 0.657 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=3.67"
Tc=6.0 min CN=86 Runoff=3.52 cfs 0.199 af
Subcatchment PS-4: Runoff Area=29,485 sf 70.98% Impervious Runoff Depth=4.41"
Tc=6.0 min CN=93 Runoff=4.23 cfs 0.249 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=4.98"
Tc=6.0 min CN=98 Runoff=2.85 cfs 0.179 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=4.98"
Tc=6.0 min CN=98 Runoff=1.01 cfs 0.063 af
Subcatchment PS-7: Runoff Area=245,856 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=391' Tc=14.0 min CN=80 Runoff=18.94 cfs 1.451 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=3.15 cfs 0.316 af
Reach DP-1: Design Point Inflow=31.66 cfs 3.307 af
Outflow=31.66 cfs 3.307 af
Pond BIO-1: Filtration Bioretention Peak Elev=599.25' Storage=1,462 cf Inflow=3.44 cfs 0.194 af
Primary=0.02 cfs 0.048 af Secondary=3.18 cfs 0.146 af Tertiary=0.00 cfs 0.000 af Outflow=3.21 cfs 0.194 af
Pond BIO-2: Filtration Bioretention Peak Elev=597.25' Storage=1,582 cf Inflow=3.52 cfs 0.199 af
Primary=0.02 cfs 0.052 af Secondary=3.23 cfs 0.147 af Tertiary=0.00 cfs 0.000 af Outflow=3.26 cfs 0.199 af
Pond BIO-3: Filtration Bioretention Peak Elev=596.27' Storage=2,865 cf Inflow=4.23 cfs 0.249 af
Primary=0.04 cfs 0.094 af Secondary=3.57 cfs 0.155 af Tertiary=0.00 cfs 0.000 af Outflow=3.61 cfs 0.249 af
Pond CH-1: Chambers Peak Elev=594.85' Storage=0.322 af Inflow=13.65 cfs 0.836 af
8.0" Round Culvert n=0.013 L=25.0' S=0.0100 '/' Outflow=2.40 cfs 0.836 af
Total Runoff Area = 11.074 ac Runoff Volume = 3.308 af Average Runoff Depth = 3.58"
73.21% Pervious = 8.107 ac 26.79% Impervious = 2.967 ac
Page 243 of 1493
Page 244
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 44
Summary for Subcatchment PS-1:
Runoff = 3.44 cfs @ 12.04 hrs, Volume= 0.194 af, Depth= 3.67"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
9,376 98 Paved parking, HSG D
18,220 80 >75% Grass cover, Good, HSG D
27,596 86 Weighted Average
18,220 66.02% Pervious Area
9,376 33.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
Runoff
3.44 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
3
Runoff Area=27,596 sf
Runoff Volume=0.194 af
Runoff Depth=3.67"
Tc=6.0 min
Flow (cfs)
2
CN=86
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 244 of 1493
Page 245
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 45
Summary for Subcatchment PS-2:
Runoff = 10.80 cfs @ 12.04 hrs, Volume= 0.657 af, Depth= 4.75"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
64,081 98 Paved parking, HSG D
8,235 80 >75% Grass cover, Good, HSG D
72,316 96 Weighted Average
8,235 11.39% Pervious Area
64,081 88.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
12 Runoff
10.80 cfs
11
NY-West Seneca 24-hr S1 100-yr
10 Rainfall=5.22"
9 Runoff Area=72,316 sf
Runoff Volume=0.657 af
8
Runoff Depth=4.75"
7
Tc=6.0 min
Flow (cfs)
6 CN=96
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 245 of 1493
Page 246
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 46
Summary for Subcatchment PS-3:
Runoff = 3.52 cfs @ 12.04 hrs, Volume= 0.199 af, Depth= 3.67"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
Runoff
3.52 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
3 Runoff Area=28,267 sf
Runoff Volume=0.199 af
Runoff Depth=3.67"
Tc=6.0 min
Flow (cfs)
2 CN=86
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 246 of 1493
Page 247
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 47
Summary for Subcatchment PS-4:
Runoff = 4.23 cfs @ 12.04 hrs, Volume= 0.249 af, Depth= 4.41"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
8,557 80 >75% Grass cover, Good, HSG D
29,485 93 Weighted Average
8,557 29.02% Pervious Area
20,928 70.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
4.23 cfs
NY-West Seneca 24-hr S1 100-yr
4
Rainfall=5.22"
Runoff Area=29,485 sf
Runoff Volume=0.249 af
3 Runoff Depth=4.41"
Tc=6.0 min
Flow (cfs)
CN=93
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 247 of 1493
Page 248
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 48
Summary for Subcatchment PS-5:
Runoff = 2.85 cfs @ 12.04 hrs, Volume= 0.179 af, Depth= 4.98"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
3 2.85 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
Runoff Area=18,756 sf
Runoff Volume=0.179 af
2 Runoff Depth=4.98"
Tc=6.0 min
Flow (cfs)
CN=98
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 248 of 1493
Page 249
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 49
Summary for Subcatchment PS-6:
Runoff = 1.01 cfs @ 12.04 hrs, Volume= 0.063 af, Depth= 4.98"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
1.01 cfs
1 NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
Runoff Area=6,622 sf
Runoff Volume=0.063 af
Runoff Depth=4.98"
Tc=6.0 min
Flow (cfs)
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 249 of 1493
Page 250
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 50
Summary for Subcatchment PS-7:
Runoff = 18.94 cfs @ 12.15 hrs, Volume= 1.451 af, Depth= 3.09"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
245,856 80 >75% Grass cover, Good, HSG D
245,856 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
21 Runoff
20 18.94 cfs
19 NY-West Seneca 24-hr S1 100-yr
18
17
Rainfall=5.22"
16 Runoff Area=245,856 sf
15
Runoff Volume=1.451 af
14
13 Runoff Depth=3.09"
Flow Length=391'
Flow (cfs)
12
11
10
Tc=14.0 min
9 CN=80
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 250 of 1493
Page 251
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 51
Summary for Subcatchment PS-8:
Runoff = 3.15 cfs @ 12.31 hrs, Volume= 0.316 af, Depth= 3.09"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
Runoff
3.15 cfs
NY-West Seneca 24-hr S1 100-yr
3
Rainfall=5.22"
Runoff Area=53,474 sf
Runoff Volume=0.316 af
Runoff Depth=3.09"
Flow Length=821'
Flow (cfs)
2
Slope=0.0100 '/'
Tc=25.7 min
CN=80
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 251 of 1493
Page 252
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 52
Summary for Reach DP-1: Design Point
Inflow Area = 11.074 ac, 26.79% Impervious, Inflow Depth = 3.58" for 100-yr event
Inflow = 31.66 cfs @ 12.12 hrs, Volume= 3.307 af
Outflow = 31.66 cfs @ 12.12 hrs, Volume= 3.307 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
31.66 cfs Outflow
34 31.66 cfs
32 Inflow Area=11.074 ac
30
28
26
24
22
Flow (cfs)
20
18
16
14
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 252 of 1493
Page 253
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 53
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.634 ac, 33.98% Impervious, Inflow Depth = 3.67" for 100-yr event
Inflow = 3.44 cfs @ 12.04 hrs, Volume= 0.194 af
Outflow = 3.21 cfs @ 12.06 hrs, Volume= 0.194 af, Atten= 7%, Lag= 1.5 min
Primary = 0.02 cfs @ 12.06 hrs, Volume= 0.048 af
Routed to Reach DP-1 : Design Point
Secondary = 3.18 cfs @ 12.06 hrs, Volume= 0.146 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 599.25' @ 12.06 hrs Surf.Area= 1,896 sf Storage= 1,462 cf
Flood Elev= 600.00' Surf.Area= 2,500 sf Storage= 3,120 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 168.5 min ( 967.4 - 798.9 )
Volume Invert Avail.Storage Storage Description
#1 598.00' 3,120 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
598.00 340 0 0
599.00 1,700 1,020 1,020
600.00 2,500 2,100 3,120
Device Routing Invert Outlet Devices
#1 Primary 598.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.06 hrs HW=599.25' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=3.18 cfs @ 12.06 hrs HW=599.25' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 3.18 cfs of 6.09 cfs potential flow)
2=Overflow Grate (Weir Controls 3.18 cfs @ 1.62 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 253 of 1493
Page 254
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 54
Pond BIO-1: Filtration Bioretention
Hydrograph
3.44 cfs Inflow
Outflow
3.21 cfs Inflow Area=0.634 ac Primary
Secondary
Tertiary
3.18 cfs Peak Elev=599.25'
Storage=1,462 cf
3
Flow (cfs)
2
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 254 of 1493
Page 255
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 55
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 3.67" for 100-yr event
Inflow = 3.52 cfs @ 12.04 hrs, Volume= 0.199 af
Outflow = 3.26 cfs @ 12.06 hrs, Volume= 0.199 af, Atten= 8%, Lag= 1.6 min
Primary = 0.02 cfs @ 12.06 hrs, Volume= 0.052 af
Routed to Reach DP-1 : Design Point
Secondary = 3.23 cfs @ 12.06 hrs, Volume= 0.147 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 597.25' @ 12.06 hrs Surf.Area= 2,044 sf Storage= 1,582 cf
Flood Elev= 598.00' Surf.Area= 2,630 sf Storage= 3,339 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 176.3 min ( 975.2 - 798.9 )
Volume Invert Avail.Storage Storage Description
#1 596.00' 3,339 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
596.00 348 0 0
597.00 1,850 1,099 1,099
598.00 2,630 2,240 3,339
Device Routing Invert Outlet Devices
#1 Primary 596.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.06 hrs HW=597.25' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=3.22 cfs @ 12.06 hrs HW=597.25' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 3.22 cfs of 5.63 cfs potential flow)
2=Overflow Grate (Weir Controls 3.22 cfs @ 1.63 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 255 of 1493
Page 256
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 56
Pond BIO-2: Filtration Bioretention
Hydrograph
3.52 cfs Inflow
Outflow
3.26 cfs Inflow Area=0.649 ac Primary
Secondary
Tertiary
3.23 cfs Peak Elev=597.25'
Storage=1,582 cf
3
Flow (cfs)
2
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 256 of 1493
Page 257
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 57
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.677 ac, 70.98% Impervious, Inflow Depth = 4.41" for 100-yr event
Inflow = 4.23 cfs @ 12.04 hrs, Volume= 0.249 af
Outflow = 3.61 cfs @ 12.08 hrs, Volume= 0.249 af, Atten= 15%, Lag= 2.3 min
Primary = 0.04 cfs @ 12.08 hrs, Volume= 0.094 af
Routed to Reach DP-1 : Design Point
Secondary = 3.57 cfs @ 12.08 hrs, Volume= 0.155 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.27' @ 12.08 hrs Surf.Area= 3,443 sf Storage= 2,865 cf
Flood Elev= 597.00' Surf.Area= 3,978 sf Storage= 5,592 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 255.7 min ( 1,030.5 - 774.9 )
Volume Invert Avail.Storage Storage Description
#1 595.00' 5,592 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
595.00 705 0 0
596.00 3,250 1,978 1,978
597.00 3,978 3,614 5,592
Device Routing Invert Outlet Devices
#1 Primary 595.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.04 cfs @ 12.08 hrs HW=596.26' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=3.57 cfs @ 12.08 hrs HW=596.26' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 3.57 cfs of 6.11 cfs potential flow)
2=Overflow Grate (Weir Controls 3.57 cfs @ 1.68 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 257 of 1493
Page 258
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 58
Pond BIO-3: Filtration Bioretention
Hydrograph
4.23 cfs Inflow
Outflow
Inflow Area=0.677 ac Primary
Secondary
Tertiary
3.61 cfs Peak Elev=596.27'
4
3.57 cfs Storage=2,865 cf
3
Flow (cfs)
2
1
0.04 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 258 of 1493
Page 259
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 59
Summary for Pond CH-1: Chambers
Inflow Area = 2.091 ac, 90.96% Impervious, Inflow Depth = 4.80" for 100-yr event
Inflow = 13.65 cfs @ 12.04 hrs, Volume= 0.836 af
Outflow = 2.40 cfs @ 12.57 hrs, Volume= 0.836 af, Atten= 82%, Lag= 31.8 min
Primary = 2.40 cfs @ 12.57 hrs, Volume= 0.836 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 594.85' @ 12.57 hrs Surf.Area= 0.127 ac Storage= 0.322 af
Flood Elev= 598.32' Surf.Area= 0.127 ac Storage= 0.433 af
Plug-Flow detention time= 68.0 min calculated for 0.836 af (100% of inflow)
Center-of-Mass det. time= 68.1 min ( 825.0 - 757.0 )
Volume Invert Avail.Storage Storage Description
#1A 591.25' 0.177 af 37.08'W x 149.10'L x 5.50'H Field A
0.698 af Overall - 0.256 af Embedded = 0.442 af x 40.0% Voids
#2A 592.00' 0.256 af ADS_StormTech MC-3500 d +Cap x 100 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
100 Chambers in 5 Rows
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
0.433 af Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
#1 Primary 591.25' 8.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.25' / 591.00' S= 0.0100 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=2.40 cfs @ 12.57 hrs HW=594.85' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 2.40 cfs @ 6.87 fps)
Page 259 of 1493
Page 260
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 60
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
5 Rows x 77.0" Wide + 9.0" Spacing x 4 + 12.0" Side Stone x 2 = 37.08' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
100 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 5 Rows = 11,144.2 cf Chamber Storage
30,410.2 cf Field - 11,144.2 cf Chambers = 19,266.0 cf Stone x 40.0% Voids = 7,706.4 cf Stone Storage
Chamber Storage + Stone Storage = 18,850.6 cf = 0.433 af
Overall Storage Efficiency = 62.0%
Overall System Size = 149.10' x 37.08' x 5.50'
100 Chambers
1,126.3 cy Field
713.6 cy Stone
Page 260 of 1493
Page 261
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 61
Pond CH-1: Chambers
Hydrograph
Inflow
15
13.65 cfs Primary
14 Inflow Area=2.091 ac
13
12
Peak Elev=594.85'
11 Storage=0.322 af
10
9
8.0"
Flow (cfs)
8 Round Culvert
7
n=0.013
6
5 L=25.0'
4
2.40 cfs S=0.0100 '/'
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 261 of 1493
Page 262
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 62
Events for Subcatchment PS-1:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.72 0.038 0.72
10-yr 3.14 1.71 0.094 1.78
100-yr 5.22 3.44 0.194 3.67
Page 262 of 1493
Page 263
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 63
Events for Subcatchment PS-2:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 3.74 0.194 1.40
10-yr 3.14 6.39 0.372 2.69
100-yr 5.22 10.80 0.657 4.75
Page 263 of 1493
Page 264
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 64
Events for Subcatchment PS-3:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.74 0.039 0.72
10-yr 3.14 1.75 0.096 1.78
100-yr 5.22 3.52 0.199 3.67
Page 264 of 1493
Page 265
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 65
Events for Subcatchment PS-4:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 1.28 0.065 1.15
10-yr 3.14 2.39 0.135 2.39
100-yr 5.22 4.23 0.249 4.41
Page 265 of 1493
Page 266
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 66
Events for Subcatchment PS-5:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 1.06 0.057 1.60
10-yr 3.14 1.72 0.104 2.91
100-yr 5.22 2.85 0.179 4.98
Page 266 of 1493
Page 267
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 67
Events for Subcatchment PS-6:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.37 0.020 1.60
10-yr 3.14 0.61 0.037 2.91
100-yr 5.22 1.01 0.063 4.98
Page 267 of 1493
Page 268
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 68
Events for Subcatchment PS-7:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 2.49 0.215 0.46
10-yr 3.14 8.08 0.638 1.36
100-yr 5.22 18.94 1.451 3.09
Page 268 of 1493
Page 269
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 69
Events for Subcatchment PS-8:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.40 0.047 0.46
10-yr 3.14 1.32 0.139 1.36
100-yr 5.22 3.15 0.316 3.09
Page 269 of 1493
Page 270
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 70
Events for Reach DP-1: Design Point
Event Inflow Outflow Elevation Storage
(cfs) (cfs) (feet) (cubic-feet)
1-yr 4.12 4.12 0.00 0
10-yr 13.96 13.96 0.00 0
100-yr 31.66 31.66 0.00 0
Page 270 of 1493
Page 271
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 71
Events for Pond BIO-1: Filtration Bioretention
Event Inflow Outflow Primary Secondary Tertiary Elevation Storage
(cfs) (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet)
1-yr 0.72 0.02 0.02 0.00 0.00 598.98 994
10-yr 1.71 1.12 0.02 1.10 0.00 599.12 1,232
100-yr 3.44 3.21 0.02 3.18 0.00 599.25 1,462
Page 271 of 1493
Page 272
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 72
Events for Pond BIO-2: Filtration Bioretention
Event Inflow Outflow Primary Secondary Tertiary Elevation Storage
(cfs) (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet)
1-yr 0.74 0.02 0.02 0.00 0.00 596.95 1,010
10-yr 1.75 1.06 0.02 1.04 0.00 597.12 1,319
100-yr 3.52 3.26 0.02 3.23 0.00 597.25 1,582
Page 272 of 1493
Page 273
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 73
Events for Pond BIO-3: Filtration Bioretention
Event Inflow Outflow Primary Secondary Tertiary Elevation Storage
(cfs) (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet)
1-yr 1.28 0.04 0.04 0.00 0.00 595.92 1,729
10-yr 2.39 1.07 0.04 1.03 0.00 596.12 2,359
100-yr 4.23 3.61 0.04 3.57 0.00 596.27 2,865
Page 273 of 1493
Page 274
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 74
Events for Pond CH-1: Chambers
Event Inflow Primary Elevation Storage
(cfs) (cfs) (feet) (acre-feet)
1-yr 4.80 1.18 592.38 0.079
10-yr 8.11 1.66 593.15 0.161
100-yr 13.65 2.40 594.85 0.322
Page 274 of 1493
Page 275
Appendix f:
Swppp inspection report
(sample form)
Page 275 of 1493
Page 276
Page 276 of 1493
Page 277
Prepared by:
LaBella Associates
Choose an item.
Choose an item.
Choose an item.
SWPPP INSPECTION REPORT NUMBER XX
CLIENT NAME
PROJECT NAME
PROJECT ADDRESS, TOWN OF X, X COUNTY, NY
PERMIT NUMBER
Performed: 2/1/2025 @ 12:00 AM
Report Issued: 2/1/2025
Status: SATISFACTORY (All erosion control measures are installed and in
working order)
Qualified Inspector (name and title) Qualified Professional (name and title)
Click or tap to enter a date. Click or tap to enter a date.
Date Date
Signature Signature
Page 277 of 1493
Page 278
Page 278 of 1493
Page 279
NYSDEC Documentation and SWPPP Forms
The project has received a Letter of Authorization (LOA) from NYSDEC Choose an item.
The project has received a five acre waiver approved by NYSDEC or MS4 Choose an item.
The project currently has disturbance greater than five acres Choose an item.
The project directly discharges to a 303d waterbody/course Choose an item.
The project is within a phosphorus enhanced watershed Choose an item.
Number of inspections required per week Choose an item.
Included in Site Log Book
Preconstruction Assessment Choose an item.
Copy of Notice of Intent (NOI) Choose an item.
Letter of Authorization (LOA) Choose an item.
SWPPP Preparer Certification Form Choose an item.
Owner/Operator Certification Form Choose an item.
MS4 SWPPP Acceptance Form Choose an item.
NYCDEP SWPPP Acceptance/Approval Form Choose an item.
MS4 No Jurisdiction Form Choose an item.
Contractor and Subcontractor Certifications Choose an item.
SPDES General Permit Choose an item.
Five Acre Waiver Authorization Choose an item.
Notice of Termination (NOT) Choose an item.
Site Conditions
Total area (acres) with active soil disturbance (not requiring temporary or final stabilization)
Total area (acres) with inactive soil disturbance (requiring temporary or final stabilization)
Total area (acres) that has achieved temporary stabilization
Total area (acres) that has achieved final stabilization
Allowable disturbed area (acres) per NOI and/or five acre waiver
Provide a general description of construction activities ongoing during inspection:
Weather Conditions Choose an item.
Temperature at time of inspection XX degrees F
Soil conditions at time of inspection Choose an item.
Description of Discharge
Sediment Discharge
Point/Surface Waters of Condition of Runoff Corrective Action(s)
Noted
the State
Choose an item. Choose an item.
Choose an item. Choose an item.
Choose an item. Choose an item.
Choose an item. Choose an item.
Page 279 of 1493
Page 280
Erosion and Sediment Control Deficiencies and Corrective Actions
In the following table, provide marks in the appropriate columns to indicate the conditions of all erosion and
sediment control practices at the site.
Erosion & Sediment Control Functioning as Needs Repair or Not Installed
Not Applicable
Practice Designed Maintenance Properly
Temporary Erosion & Sediment Control Practices
General Site Conditions ☐ ☐ ☐ ☐
Stabilized Construction Access ☐ ☐ ☐ ☐
Silt Fence ☐ ☐ ☐ ☐
Inlet Protection Measures ☐ ☐ ☐ ☐
Soil Stockpiles ☐ ☐ ☐ ☐
Dust Control Measures ☐ ☐ ☐ ☐
Pavement Sweeping ☐ ☐ ☐ ☐
Temporary Stabilization ☐ ☐ ☐ ☐
Dewatering Operations ☐ ☐ ☐ ☐
Slope Protection Measures ☐ ☐ ☐ ☐
Temporary Parking Areas ☐ ☐ ☐ ☐
Concrete Washout ☐ ☐ ☐ ☐
Temporary Swales and Berms ☐ ☐ ☐ ☐
Stone Check Dams ☐ ☐ ☐ ☐
Sediment Traps/Basins ☐ ☐ ☐ ☐
Compost Filter Sock ☐ ☐ ☐ ☐
Temporary Stream Crossing ☐ ☐ ☐ ☐
Fiber Roll ☐ ☐ ☐ ☐
Water Bars ☐ ☐ ☐ ☐
Flow Diffusers ☐ ☐ ☐ ☐
Other: ☐ ☐ ☐ ☐
Permanent Erosion & Sediment Control Practices
Rock Outlet Protection ☐ ☐ ☐ ☐
Permanent Turf Reinforcement ☐ ☐ ☐ ☐
Permanent Stabilization ☐ ☐ ☐ ☐
Other: ☐ ☐ ☐ ☐
Refer to the following page for deficiencies and corrective actions
Page 280 of 1493
Page 281
Corrective Actions
For all erosion and sediment control practices identified in the above table as “needs repair or maintenance” or “not
installed properly,” provide detailed corrective actions that are required.
Date
Date
Deficiency Deficiency
ESC Practice ID Deficiency and Corrective Action Deficiency
First Corrected?
Corrected
Reported
Choose an item. Click or Choose an Click or tap
Choose an item. tap to
Click or item. an
Choose to enter
Click a
or tap
Choose an item. enter
tap to
Click a
or item. an
Choose date.
to enter
Click a
or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. date.
to enter a
date.a
enter date.
date.
Page 281 of 1493
Page 282
Stormwater Management Practices
For all stormwater management practices proposed on the project, indicate the status of each practice at the time
of inspection, any deficiencies (if applicable) and corresponding corrective actions.
SMP
Sign Deficiency and Corrective Deficiency Corrected
Practice Status
Installed Action (if Applicable) Date Action Date
ID
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Page 282 of 1493
Page 283
Deficiencies and Corrective Action Photo Log
Deficiency Photo 1 Corrective Action Photo 1
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 2 Corrective Action Photo 2
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 3 Corrective Action Photo 3
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Page 283 of 1493
Page 284
Deficiencies and Corrective Action Photo Log (continued)
Deficiency Photo 4 Corrective Action Photo 4
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 5 Corrective Action Photo 5
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 6 Corrective Action Photo 6
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Page 284 of 1493
Page 285
Disturbance / Photo Location Map
Replace this page to include an 11x17 erosion control plan sketch to scale showing:
1. Areas with active soil disturbance activity
2. Areas with inactive soil disturbance activity
3. Areas that have achieved temporary stabilization
4. Areas that have achieved final stabilization
5. Photo locations for deficiencies
6. Photo locations for corrective actions
7. Location of erosion and sediment control practices installed
Use Bluebeam template with standard colors to indicate limits
Page 285 of 1493
Page 286
Page 286 of 1493
Page 287
Appendix G:
Post-construction
inspections and maintenance
Page 287 of 1493
Page 288
Page 288 of 1493
Page 289
Bioretention Stormwater Management Practices
Level 1 Inspection Checklist
SMP ID # SMP Owner Private
Public
SMP Location
(Address; Latitude
& Longitude)
Latitude Longitude
Party Responsible for
System Type Type of Site
Maintenance
Same as SMP Owner Seasonal Above Ground Commercial
Other Continuous Use Below Ground Industrial
Other Residential
_________________________
State
Inspection Date Inspection Time
Inspector
Date of Last
Inspection
BR Drainage Area
Look for areas that are uphill from the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Seed and mulch areas of bare soil to establish
vegetation.
Bare soil, erosion Fill in erosion areas with soil, compact, and seed and
of the ground straw to establish vegetation.
(rills washing out If a rill or small channel is forming, try to redirect water
the dirt) flowing to this area by creating a small berm or adding
topsoil to areas that are heavily compacted.
Other:
Page 1 of 8
Page 289 of 1493
Page 290
BR Drainage Area
Look for areas that are uphill from the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Kick-Out to Level 2 Inspection: Large areas of soil
have been eroded, or larger channels are forming.
May require rerouting of flow paths.
Piles of grass Remove or cover piles of grass clippings,
clippings, mulch, mulch, dirt, etc.
dirt, salt, or
other materials Other:
Cover or properly dispose of materials; consult your
Open containers local solid waste authority for guidance on materials
of oil, grease, that may be toxic or hazardous.
paint, or other
substances
Other:
Page 2 of 8
Page 290 of 1493
Page 291
BR Inlets
Stand in the Bioretention cell itself and look for all the places where water flows in. Often there will be multiple points of inflow to the
practice.
Problem (Check if Present) Follow-Up Actions
Use a flat shovel to remove grit and debris (especially at curb inlets
or openings). Parking lots generate fine grit that will accumulate at
these spots.
Pull out clumps of growing grass or weeds and scoop out the soil or grit
that the plants are growing in.
Remove any grass clippings, leaves, sticks, and other debris that is
collecting at inlets.
For pipes and ditches, remove sediment and debris that is partially
blocking the pipe or ditch opening where it enters the Bioretention cell.
Dispose of all material properly where it will not re-enter the
Bioretention cell.
Other:
Inlets collect grit and debris or grass/weeds.
Some water may not be getting into the
Bioretention cell. The objective is to have a
clear pathway for water to flow into the cell.
Kick-Out to Level 2 Inspection: Inlets are blocked to the extent that most
of the water does not seem to be entering the Bioretention cell.
For small areas of erosion, smooth out the eroded part and apply rock or
stone (e.g., river cobble) to prevent further erosion. Usually, filter fabric is
placed under the rock or stone.
In some cases, reseeding and applying erosion-control matting can be
used to prevent further erosion. Some of these materials may be available
at a garden center, but it may be best to consult a landscape contractor.
Other:
Kick-Out to Level 2 Inspection: Erosion is occurring at most of the inlets,
Some or all of the inlets are eroding so that and it looks like there is too much water that is concentrating at these
rills, gullies, and other erosion is present, or points. The inlet design may have to be modified.
there is bare dirt that is washing into the
Bioretention cell.
Page 3 of 8
Page 291 of 1493
Page 292
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Add new mulch to a total depth (including any existing mulch that is left) of 2
to 3 inches. The mulch should be shredded hardwood mulch that is less
likely to float away during rainstorms.
Avoid adding too much mulch so that inlets are obstructed or certain areas
become higher than the rest of the Bioretention surface.
Other:
Mulch (if used) needs to be replaced or
replenished. The mulch layer had
decomposed or is less than 1-inch thick.
Use a shovel to scoop out minor areas of sediment or grit, especially in the
spring after winter sanding materials may wash in and accumulate. Dispose
of the material where it cannot re-enter the Bioretention cell .
If removing the material creates a hole or low area, fill with soil mix that
matches original mix and cover with mulch so that the Bioretention surface
area is as flat as possible.
Remove trash, vegetative debris, and other undesirable materials.
Other:
Kick-Out to Level 2 Inspection: Sediment has accumulated more than 2-
inches deep and covers 25% or more of the Bioretention surface.
Kick-Out to Level 2 Inspection: The Bioretention cell is too
densely vegetated to assess sediment accumulation or ponding;
Minor areas of sediment, grit, trash, or other see BR-4, Vegetation.
debris are accumulating on the bottom.
Page 4 of 8
Page 292 of 1493
Page 293
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Try filling the eroded areas with clean topsoil or sand, and cover with
mulch.
If the problem recurs, you may have to use stone (e.g., river cobble) to fill
in problem areas.
If the erosion is on a side slope, fill with clay that can be compacted and
seed and mulch the area.
Other:
There is erosion in the bottom or on the side
slopes. Water seems to be carving out rills as
it flows across the Bioretention surface or on
the slopes, or sinkholes are forming in certain Kick-Out to Level 2 Inspection: The problem persists or the erosion is more
areas. than 3-inches deep and seems to be an issue with how water enters and
Source: Stormwater Maintenance, LLC. moves through the Bioretention cell.
Kick-Out to Level 2 Inspection: The problem does not seem to be caused
by flowing water, but a collapse or sinking of the surface (e.g., “sinkhole”)
due to some underground problem.
If the problem is minor (just small, isolated areas are not covered with
water), try raking the surface OR adding mulch to low spots to create a
more level surface. You may need to remove and replace plantings in
order to properly even off the surface.
Check the surface with a string and bubble level to get the surface as flat
as possible.
Other:
Kick-Out to Level 2 Inspection: Ponding water is isolated to less than half
The bottom of the Bioretention cell is not flat,
of the Bioretention surface area, and there seem to be elevation
and the water pools at one end, along an
differences of more than a couple of inches across the surface.
edge, or in certain pockets. The whole bottom
is not uniformly covered with water. See
design plan to verify that bioretention surface
is intended to be flat. Check during or
immediately after a rainstorm.
Page 5 of 8
Page 293 of 1493
Page 294
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Kick-Out to Level 2 Inspection: This is generally a serious problem, and it
will be necessary to activate a Level 2 Inspection.
Water stands on the surface more than 72
hours after a rainstorm and /or wetland-type
vegetation is present. The Bioretention cell
does not appear to be draining properly.
BR Vegetation
Examine all Bioretention cell vegetation.
Problem (Check if Present) Follow-Up Actions
If you can identify which plants are weeds or not intended to
be part of the planting plan, eliminate these, preferably by
hand pulling.
If weeds are widespread, check with the local stormwater
authority and/or Extension Office about proper use of
herbicides for areas connected with the flow of water.
Even vegetation that is intended to be present can become
large, overgrown, and/or crowd out surrounding plants. Prune
and thin accordingly.
If weeds or invasive plants have overtaken the whole
Bioretention cell , bush-hog the entire area before seedheads
form in the spring. It will be necessary to remove the root mat
manually or with appropriate herbicides, as noted above.
Re-plant with species that are aesthetically pleasing and
seem to be doing well in the Bioretention cell.
Other:
Kick-Out to Level 2 Inspection: You are unsure of the original
planting design, or the vegetation maintenance task is beyond
Vegetation requires regular maintenance—pulling
your capabilities of time, expertise, or resources. If you are
weeds, removing dead and diseased plants, replacing
unsure of the health of the vegetation (e.g. salt damage,
mulch around plants, adding plants to fill in areas that
invasives, which plants are undesirable) or the appropriate
are not well vegetated, etc.
season to conduct vegetation management, consult a
landscape professional before undertaking any cutting,
pruning, mowing, or brush hogging.
Page 6 of 8
Page 294 of 1493
Page 295
BR Vegetation
Examine all Bioretention cell vegetation.
Problem (Check if Present) Follow-Up Actions
The original plants are likely not suited for the actual
conditions within the Bioretention cell . If you are
knowledgeable about plants, select and plant more
appropriate vegetation (preferably native plants) so that
almost the entire surface area will be covered by the end of
the second growing season.
Other:
Kick-Out to Level 2 Inspection: For all but small practices
(e.g., rain gardens), this task will likely require a landscape
design professional or horticulturalist.
Vegetation is too thin, is not healthy, and there are
many spots that are not well vegetated.
BR Outlets
Examine outlets that release water out of the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Add stone to reduce the impact from the water flowing out of the outlet pipe or
weir during storms.
Other:
Erosion at outlet
Kick-Out to Level 2 Inspection: Rills have formed and erosion problem
becomes more severe.
Remove the debris and dispose of it where it cannot re-enter the
Bioretention cell .
Other:
Kick-Out to Level 2 Inspection: Outlet is completely clogged or obstructed;
there is too much material to remove by hand or with simple hand tools.
Outlet obstructed with mulch, sediment,
debris, trash, etc.
Page 7 of 8
Page 295 of 1493
Page 296
Additional Notes:
Inspector: Date:
Complete the following if follow-up/corrective actions were identified during this inspection:
Certified Completion of Follow-Up Actions:
“I hereby certify that the follow-up/corrective actions identified in the inspection
performed on _____________ (DATE) have been completed and any required
maintenance deficiencies have been adequately corrected.”
Inspector/Operator: Date:
Page 8 of 8
Page 296 of 1493
Page 297
Bioretention Stormwater Management Practices
Level 2 Inspection Checklist
SMP ID # SMP Owner Private
Public
SMP Location
(Address; Latitude
& Longitude)
Latitude Longitude
Party Responsible for
System Type Type of Site
Maintenance
Same as SMP Owner Seasonal Above Ground Commercial
Other Continuous Use Below Ground Industrial
Other Residential
_________________________ State
Inspection Date Inspection Time
Inspector
Date of Last
Inspection
Page 1 of 4
Page 297 of 1493
Page 298
Level 2 Inspection: BIORETENTION
NOTE: Key Source for this Information (CSN, 2013)
Recommended Repairs Triggers for Level 3 Inspection
Observed Condition: Water Stands on Surface for More than 72 Hours after Storm
Condition 1: Small pockets of standing water
Use a soil probe or auger to examine the soil profile. If isolated areas have
accumulated grit, fines, or vegetative debris or have bad soil media, try scraping
off top 3 inches of media and replacing with clean material. Also check to see
that surface is level and water is not ponding selectively in certain areas. Soil media is clogged and problem is not
evident from Level 2 inspection.
Level 2 inspection identifies problem, but it
Condition 2: Standing water is widespread or covers entire surface cannot be resolved easily or is associated
with the original design of the practice.
Requires diagnosis and resolution of problem:
Clogged underdrain?
Filter fabric between soil media and underdrain stone?
Need to install underdrain if not present? Level 3 inspection necessary
Too much sediment/grit washing in from drainage area?
Too much ponding depth?
Improper soil media?
Observed Condition: Vegetation is sparse or out of control
Condition 1: Original design planting plan seems good but has not been
maintained, so there are many invasives and/or dead plants
Vegetation deviates significantly from
Will require some horticultural experience to restore vegetation to intended original planting plan; Bioretention has
condition by weeding, pruning, removing plants, and adding new plants. been neglected and suffered from deferred
maintenance.
Owner/responsible party does not know
Condition 2: Original design planting plan is unknown or cannot be how to maintain the practice.
actualized
A landscape architect or horticulturalist will be needed to redo the planting plan.
Will likely require analysis of soil pH, moisture, organic content, sun/shade, and
other conditions to make sure plants match conditions. Plan should include Level 3 inspection necessary
invasive plant management and maintenance plan to include mulching,
watering, disease intervention, periodic thinning/pruning, etc.
Observed Condition: Bioretention does not conform to original design plan in surface area or storage
Condition 1: Level 2 Inspection reveals that practice is too small based More than a 25% departure from the
on design dimension, does not have adequate storage (e.g., ponding approved plan in surface area, storage, or
depth) based on the plan, and/or does not treat the drainage area runoff drainage area; sometimes less than this
as indicated on the plan threshold at the discretion of the Level 2
inspector.
Small areas of deviation can be corrected by the property owner or responsible
party, but it is likely that a Qualified Professional will have to revisit the design
and attempt a redesign that meets original objectives or that can be resubmitted
to the municipality for approval. Level 3 inspection necessary
Page 2 of 4
Page 298 of 1493
Page 299
Level 2 Inspection: BIORETENTION
NOTE: Key Source for this Information (CSN, 2013)
Recommended Repairs Triggers for Level 3 Inspection
Observed Condition: Severe erosion of filter bed, inlets, or around outlets
Condition 1: Erosion at inlets
The lining (e.g., grass, matting, stone, rock) may not be adequate for the actual
flow velocities coming through the inlets. First line of defense is to try a more
non-erosive lining and/or to extend the lining further down to where inlet slopes
meet the Bioretention surface. If problem persists, analysis by a Qualified Erosion (rills, gullies) is more than 12
Professional is warranted. inches deep at inlets or the filter bed or
more than 3 inches deep on side slopes.
If the issue is not caused by moving water
Condition 2: Erosion of Bioretention filter bed but some sort of subsurface defect. This
may manifest as a sinkhole or linear
This is often caused by “preferential flow paths” through and along the depression and be associated with
Bioretention surface. The source of flow should be analyzed and methods problems with the underdrain stone or pipe
employed to dissipate energy and disperse the flow (e.g., check dams, rock or underlying soil.
splash pads).
Condition 3: Erosion on side slopes
Level 3 inspection necessary
Again, the issue is likely linked with unanticipated flow paths down the side
slopes (probably overland flow that concentrates as it hits the edge of the
slope). For small or isolated areas, try filling, compacting, and re-establishing
healthy ground cover vegetation. If the problem is more widespread, further
analysis is required to determine how to redirect the flow.
Observed Condition: Significant sediment accumulation, indicating an uncontrolled source of sediment
Condition 1: Isolated areas of sediment accumulation, generally less than
3-inches deep
More than 2 inches of accumulated
Sediment source may be from a one-time or isolated event. Remove sediment cover 25% or more of the
accumulated sediment and top 2 to 3 inches of Bioretention soil media; replace Bioretention surface area.
with clean material. Check drainage area for any ongoing sources of sediment.
“Hard pan” of thin, crusty layer covers
majority of Bioretention surface area and
seems to be impeding flow of water down
Condition 2: Majority of the surface is caked with “hard pan” (thin layer of through the soil media.
clogging material) or accumulated sediment that is 3-inches deep or
more New sources of sediment seem to be
accumulating with each significant rainfall
This can be caused by an improper construction sequence (drainage area not event.
fully stabilized prior to installation of Bioretention soil media) or another chronic
source of sediment in the drainage area. Augering several holes down through
the media can indicate how severe the problem is; often the damage is confined
to the first several inches of soil media. Removing and replacing this top layer Level 3 inspection necessary
(or to the depth where sediment incursion is seen in auger holes) can be
adequate, as long as the problem does not recur.
Page 3 of 4
Page 299 of 1493
Page 300
Notes:
Inspector: Date:
Complete the following if follow-up/corrective actions were identified during this inspection:
Certified Completion of Follow-Up Actions:
“I hereby certify that the follow-up/corrective actions identified in the inspection
performed on _____________ (DATE) have been completed and any required
maintenance deficiencies have been adequately corrected.”
Inspector/Operator: Date:
Page 4 of 4
Page 300 of 1493
Page 301
Appendix e:
Nysdec “deep-ripping and
decompaction,” April 2008
Page 301 of 1493
Page 302
Page 302 of 1493
Page 303
New York State
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Document Prepared by:
John E. Lacey,
Land Resource Consultant and Environmental Compliance Monitor
Division of Water (Formerly with the Division of Agricultural Protection and Development Services,
NYS Dept. of Agriculture & Markets)
Deep-Ripping and
Decompaction
April 2008
New York State
Department of Environmental Conservation
Page 303 of 1493
Page 304
AlternativeȱStormwaterȱManagementȱ
DeepȬRippingȱandȱDecompactionȱ
ȱ ȱ ȱ ȱ ȱ ȱ ȱ ȱ ȱ Recommended Application of Practice
Description
Theȱobjective of Deep Ripping and
The two-phase practice of 1) “Deep Ripping;” and 2) “Decompaction” (deep subsoiling), of the Decompaction is to effectively fracture
soil material as a step in the cleanup and restoration/landscaping of a construction site, helps (vertically and laterallly) through the thickness
mitigate the physically induced impacts of soil compression; i.e.: soil compaction or the of the physically compressed subsoil material
substantial increase in the bulk density of the soil material. (see Figure 3), restoring soil porosity and
permeability and aiding infiltration to help
Deep Ripping and Decompaction are key factors which help in restoring soil pore space and reduce runoff. Together with topsoil stripping,
permeability for water infiltration. Conversely, the physical actions of cut-and-fill work, land the “two-phase” practice of Deep Ripping and
grading, the ongoing movement of construction equipment and the transport of building Decompaction first became established as a “best
materials throughout a site alter the architecture and structure of the soil, resulting in: the mixing management practice” through ongoing success
of layers (horizons) of soil materials, compression of those materials and diminished soil on commercial farmlands affected by heavy Fig. 3. Construction site with significant
porosity which, if left unchecked, severely impairs the soil’s water holding capacity and vertical utility construction right-of-way projects compaction of the deep basal till subsoil
drainage (rainfall infiltration), from the surface downward. (transmission pipelines and large power lines). extends 24 inches below this exposed cut-
and-fill work surface.
In a humid climate region, compaction damage on a site is virtually guaranteed over the duration Soil permeability, soil drainage and cropland
of a project. Soil in very moist to wet condition when compacted, will have severely reduced productivity were restored. For broader
permeability. Figure 1 displays the early stage of the deep-ripping phase (Note that all topsoil construction application, the two-phase practice of Deep Ripping and Decompaction is best
was stripped prior to construction access, and it remains stockpiled until the next phase – adapted to areas impacted with significant soil compaction, on contiguous open portions of large
decompaction – is complete). A heavy-duty tractor is pulling a three-shank ripper on the first of construction sites and inside long, open construction corridors used as temporary access over the
several series of incrementally deepening passes through the construction access corridor's duration of construction. Each mitigation area should have minimal above-and-below-ground
densely compressed subsoil material. Figure 2 illustrates the approximate volumetric obstructions for the easy avoidance and maneuvering of a large tractor and ripping/decompacting
composition of a loam surface soil when conditions are good for plant growth, with adequate implements. Conversely, the complete two-phase practice is not recommended in congested or
natural pore space for fluctuating moisture conditions. obstructed areas due to the limitations on tractor and implement movement.
Benefits
Aggressive “deep ripping” through the compressed thickness of exposed subsoil before the
replacement/respreading of the topsoil layer, followed by “decompaction,” i.e.: “sub-soiling,”
through the restored topsoil layer down into the subsoil, offers the following benefits:
x Increases the project (larger size) area’s direct surface infiltration of rainfall by
providing the open site’s mitigated soil condition and lowers the demand on
concentrated runoff control structures
Fig. 1. A typical deep ripping phase of this
practice, during the first in a series of Fig. 2. About 50% of the volume of undisturbed x Enhances direct groundwater recharge through greater dispersion across and through a
progressively deeper “rips” through severely loam surface soil is pore space, when soil is in broader surface than afforded by some runoff-control structural measures
compressed subsoil. good condition for plant growth. Brady, 2002.
x Decreases runoff volume generated and provides hydrologic source control
ȱ
x May be planned for application in feasible open locations either alone or in
1
2
Page 304 of 1493
Page 305
conjunction with plans for structural practices (e.g., subsurface drain line or lawn/ground cover to help maintain the restored subsoil structure. Infiltration after construction-
infiltration basin) serving the same or contiguous areas induced mixing and compression of such subsoil material can be notably rehabilitated with the
Deep Ripping and Decompaction practice, which prepares the site for the appropriate long-term
x Promotes successful long-term revegetation by restoring soil permeability, drainage and lawn/ground cover mix including deep taproot plants such as clover, fescue or trefoil, etc. needed
water holding capacity for healthy (rather than restricted) root-system development of for all rehabilitated soils.
trees, shrubs and deep rooted ground cover, minimizing plant drowning during wet
periods and burnout during dry periods. Generally, soils in Hydrologic Soil Groups A and B, which respectively may include deep, well-
drained, sandy-gravelly materials or deep, moderately well-drained basal till materials, are among
Feasibility/Limitations the easier ones to restore permeability and infiltration, by deep ripping and decompaction. Among
the many different soils in Hydrologic Soil Group C are those unique glacial tills having a natural
The effectiveness of Deep Ripping and Decompaction is governed mostly by site factors such as: fragipan zone, beginning about 12 to 18 inches (30 – 45cm), below surface. Although soils in
the original (undisturbed) soil’s hydrologic characteristics; the general slope; local weather/timing Hydrologic Soil Group C do require a somewhat more carefully applied level of the Deep Ripping
(soil moisture) for implementation; the space-related freedom of equipment/implement and Decompaction practice, it can greatly benefit such affected areas by reducing the runoff and
maneuverability (noted above in Recommended Application of Practice), and by the proper fostering infiltration to a level equal to that of pre-disturbance.
selection and operation of tractor and implements (explained below in Design Guidance). The
more notable site-related factors include: Soils in Hydrologic Soil Group D typically have a permanent high water table close to the surface,
influenced by a clay or other highly impervious layer of material. In many locations with clay
Soil subsoil material, the bulk density is so naturally high that heavy trafficking has little or no added
In the undisturbed condition, each identified soil type comprising a site is grouped into one of impact on infiltration; and structural runoff control practices rather than Deep Ripping and
four categories of soil hydrology, Hydrologic Soil Group A, B, C or D, determined primarily by a Decompaction should be considered.
range of characteristics including soil texture, drainage capability when thoroughly wet, and depth
to water table. The natural rates of infiltration and transmission of soil-water through the The information about Hydrologic Soil Groups is merely a general guideline. Site-specific data
undisturbed soil layers for Group A is “high” with a low runoff potential while soils in Group B such as limited depths of cut-and-fill grading with minimal removal or translocation of the inherent
are moderate in infiltration and the transmission of soil-water with a moderate runoff potential, subsoil materials (as analyzed in the county soil survey) or, conversely, the excavation and
depending somewhat on slope. Soils in Group C have slow rates of infiltration and transmission translocation of deeper, unconsolidated substratum or consolidated bedrock materials (unlike the
of soil-water and a moderately high runoff potential influenced by soil texture and slope; while analyzed subsoil horizons’ materials referred to in the county soil survey) should always be taken
soils in Group D have exceptionally slow into account.
rates of infiltration and transmission of soil-
water, and high runoff potential. Sites made up with significant quantities of large rocks, or having a very shallow depth to bedrock,
are not conducive to deep ripping and decompation (subsoiling); and other measures may be more
In Figure 4, the profile displays the practical.
undisturbed horizons of a soil in Hydrologic
Soil Group C and the naturally slow rate of Slope
infiltration through the subsoil. The slow rate The two-phase application of 1) deep ripping and 2) decompaction (deep subsoiling), is most
of infiltration begins immediately below the practical on flat, gentle and moderate slopes. In some situations, such as but not limited to
topsoil horizon (30 cm), due to the limited temporary construction access corridors, inclusion areas that are moderately steep along a project’s
amount of macro pores, e.g.: natural subsoil otherwise gentle or moderate slope may also be deep ripped and decompacted. For limited
fractures, worm holes and root channels. instances of moderate steepness on other projects, however, the post-construction land use and the
Infiltration after the construction-induced relative alignment of the potential ripping and decompaction work in relation to the lay of the
mixing and compression of such subsoil slope should be reviewed for safety and practicality. In broad construction areas predominated by
material is virtually absent; but can be moderately steep or steep slopes, the practice is generally not used.
restored back to this natural level with the
Fig. 4. Profile (in centimeters) displaying the Local Weather/Timing/Soil Moisture
two-phase practice of deep ripping and
infiltration test result of the natural undisturbed Effective fracturing of compressed subsoil material from the exposed work surface, laterally and
decompaction, followed by the permanent
horizons of a soil in Hydrologic Soil Group C. vertically down through the affected zone is achieved only when the soil material is moderately
establishment of an appropriate, deep taproot
dry to moderately moist. Neither one of the two-phases, deep ripping nor decompaction (deep
3 4
Page 305 of 1493
Page 306
subsoiling), can be effectively conducted when the soil material (subsoil or replaced topsoil) is in rainfall infiltration are being restored, a policy limiting all further traffic to permanent travel lanes
either a “plastic” or “liquid” state of soil consistency. Pulling the respective implements legs is maintained.
through the soil when it is overly moist only results in the “slicing and smearing” of the material or
added “squeezing and compression” instead of the necessary fracturing. Ample drying time is The other critical elements, outlined below, are: using the proper implements (deep, heavy-duty
needed for a “rippable” soil condition not merely in the material close to the surface, but rippers and subsoilers), and ample pulling-power equipment (tractors); and conducting the practice
throughout the material located down to the bottom of the physically compressed zone of the at the appropriate speed, depth and pattern(s) of movement.
subsoil.
Note that an appropriate plan for the separate practice of establishing a healthy perennial ground
The “poor man’s Atterberg field test” for soil cover, with deep rooting to help maintain the restored soil structure, should be developed in
plasticity is a simple “hand-roll” method used advance. This may require the assistance of an agronomist or landscape horticulturist.
for quick, on-site determination of whether or
not the moisture level of the affected soil
material is low enough for: effective deep Implements
ripping of subsoil; respreading of topsoil in a Avoid the use of all undersize implements. The small-to-medium, light-duty tool will, at best, only
friable state; and final decompaction (deep “scarify” the uppermost surface portion of the mass of compacted subsoil material. The term
subsoiling). Using a sample of soil material “chisel plow” is commonly but incorrectly applied to a broad range of implements. While a few
obtained from the planned bottom depth of may be adapted for the moderate subsoiling of non-impacted soils, the majority are less durable
ripping, e.g.: 20 - 24 inches below exposed and used for only lighter land-fitting (see Figure 6).
subsoil surface, the sample is hand rolled
between the palms down to a 1/8-inch diameter
thread. (Use the same test for stored topsoil Fig. 5. Augered from a depth of 19 inches
material before respreading on the site.) If the below the surface of the replaced topsoil,
respective soil sample crumbles apart in this subsoil sample was hand rolled to a
segments no greater than 3/8 of an inch long, by 1/8-inch diameter. The test shows the soil at
the time it is rolled down to 1/8 inch diameter, it this site stretches out too far without
is low enough in moisture for deep ripping (or crumbling; it indicates the material is in a
topsoil replacement), and decompaction. plastic state of consistence, too wet for final
Conversely, as shown in Figure 5, if the rolled decompaction (deep subsoiling) at this time.
sample stretches out in increments greater than
3/8 of an inch long before crumbling, it is in a “plastic” state of soil consistency and is too wet for
subsoil ripping (as well as topsoil replacement) and final decompaction.
Fig. 6. A light duty chisel implement, not Fig. 7. One of several variations of an
adequate for either the deep ripping or agricultural ripper. This unit has long, rugged
Design Guidance
shanks mounted on a steel V-frame for deep,
decompaction (deep subsoiling) phase.
aggressive fracturing through Phase 1.
Beyond the above-noted site factors, a vital requirement for the effective Deep Ripping and
Decompaction (deep subsoiling), is implementing the practice in its distinct, two-phase process:
Use a “heavy duty” agricultural-grade, deep ripper (see Figures 7,9,10 and 11) for the first phase:
1) Deep rip the affected thickness of exposed subsoil material (see Figure 10 and 11), aggressively the lateral and vertical fracturing of the mass of exposed and compressed subsoil, down and
fracturing it before the protected topsoil is reapplied on the site (see Figure 12); and through, to the bottom of impact, prior to the replacement of the topsoil layer. (Any oversize rocks
which are uplifted to the subsoil surface during the deep ripping phase are picked and removed.)
2) Decompact (deep subsoil), simultaneously through the restored topsoil layer and the upper half Like the heavy-duty class of implement for the first phase, the decompaction (deep subsoiling) of
of the affected subsoil (Figure 13). The second phase, “decompaction,” mitigates the partial Phase 2 is conducted with the heavy-duty version of the deep subsoiler. More preferable is the
recompaction which occurs during the heavy process of topsoil spreading/grading. Prior to deep angled-leg variety of deep subsoiler (shown in Figures 8 and 13). It minimizes the inversion of the
ripping and decompacting the site, all construction activity, including construction equipment and subsoil and topsoil layers while laterally and vertically fracturing the upper half of the previously
material storage, site cleanup and trafficking (Figure 14), should be finished; and the site closed off ripped subsoil layer and all of the topsoil layer by delivering a momentary, wave-like “lifting and
to further disturbance. Likewise, once the practice is underway and the area’s soil permeability and shattering” action up through the soil layers as it is pulled.
5 6
Page 306 of 1493
Page 307
Pulling-Power of Equipment Depth and Patterns of Movement
Use the following rule of thumb for tractor horsepower (hp) whenever deep ripping and As previously noted both Phase 1 Deep Ripping through significantly compressed, exposed subsoil
decompacting a significantly impacted site: For both types of implement, have at least 40 hp of and Phase 2 Decompaction (deep subsoiling) through the replaced topsoil and upper subsoil need
tractor pull available for each mounted shank/ leg. to be performed at maximum capable depth of each implement. With an implement’s guide wheels
attached, some have a “normal” maximum operating depth of 18 inches, while others may go
Using the examples of a 3-shank and a 5-shank implement, the respective tractors should have 120 deeper. In many situations, however, the tractor/implement operator must first remove the guide
and 200 hp available for fracturing down to the final depth of 20-to-24 inches per phase. Final wheels and other non essential elements from the implement. This adapts the ripper or the deep
depth for the deep ripping in Phase 1 is achieved incrementally by a progressive series of passes subsoiler for skillful pulling with its frame only a few inches above surface, while the shanks or
(see Depth and Patterns of Movement, below); while for Phase 2, the full operating depth of the legs, fracture the soil material 20-to-24 inches deep.
deep subsoiler is applied from the beginning.
There may be construction sites where the depth of the exposed subsoil’s compression is moderate,
The operating speed for pulling both types of e.g.: 12 inches, rather than deep. This can be verified by using a ¾ inch cone penetrometer and a
implement should not exceed 2 to 3 mph. At shovel to test the subsoil for its level of compaction, incrementally, every three inches of
this slow and managed rate of operating speed, increasing depth. Once the full thickness of the subsoil’s compacted zone is finally “pieced” and
maximum functional performance is sustained there is a significant drop in the psi measurements of the soil penetrometer, the depth/thickness of
by the tractor and the implement performing the compaction is determined. This is repeated at several representative locations of the construction
soil fracturing. Referring to Figure 8, the site. If the thickness of the site’s subsoil compaction is verified as, for example, ten inches, then
implement is the 6-leg version of the deep the Phase 1 Deep Ripping can be correspondingly reduced to the implement’s minimum operable
angled-leg subsoiler. Its two outside legs are depth of 12 inches. However, the Phase 2 simultaneous Decompation (subsoiling) of an 11 inch
“chained up” so that only four legs will be thick layer of replaced topsoil and the upper subsoil should run at the subsoiling implements full
engaged (at the maximum depth), requiring no operating depth.
less than 160 hp, (rather than 240 hp) of pull.
The 4-wheel drive, articulated-frame tractor in
Figure 8 is 174 hp. It will be decompacting this Fig. 8. A deep, angled-leg subsoiler, ideal for
unobstructed, former construction access area Phase 2 decompaction of after the topsoil layer
simultaneously through 11 inches of replaced is graded on top of the ripped subsoil.
topsoil and the upper 12 inches of the
previously deep-ripped subsoil. In constricted
areas of Phase 1) Deep Ripping, a medium-size
tractor with adequate hp, such as the one in
Figure 9 pulling a 3-shank deep ripper, may be
more maneuverable.
Some industrial-grade variations of ripping Fig. 10. An early pass with a 3-shank deep Fig. 11. A repeat run of the 3-shank ripper
implements are attached to power graders and ripper penetrating only 8 inches into this along the same patterned pass area as Fig. 9;
bulldozers. Although highly durable, they are worksite’s severely compressed subsoil. here, incrementally reaching 18 of the needed
generally not recommended. Typically, the 22 inches of subsoil fracture.
shanks or “teeth” of these rippers are too short
and stout; and they are mounted too far apart to
achieve the well-distributed type of lateral and Fig. 9. This medium tractor is pulling a 3- Typically, three separate series (patterns) are used for both the Phase 1 Deep Ripping and the
vertical fracturing of the soil materials shank deep ripper. The severely compacted Phase 2 Decompaction on significantly compacted sites. For Phase 1, each series begins with a
necessary to restore soil permeability and construction access corridor is narrow, and the moderate depth of rip and, by repeat-pass, continues until full depth is reached. Phase 2 applies the
infiltration. In addition, the power graders and 120 hp tractor is more maneuverable for Phase full depth of Decompation (subsoiling), from the beginning.
bulldozers, as pullers, are far less maneuverable 1 deep ripping (subsoil fracturing), here.
for turns and patterns than the tractor. Every separate series (pattern) consists of parallel, forward-and-return runs, with each progressive
7 8
Page 307 of 1493
Page 308
pass of the implement’s legs or shanks evenly staggered between those from the previous pass.
This compensates for the shank or leg-spacing on the implement, e.g., with 24-to-30 inches Ɣ A second series of passes makes a broad “S” shaped pattern of rips, continually
between each shank or leg. The staggered return pass ensures lateral and vertical fracturing and gradually alternating the “S” curves between opposite edges inside the
actuated every 12 to 15 inches across the densely compressed soil mass. compacted corridor.
Large, Unobstructed Areas Ɣ The third and final series again uses the broad, alternating S pattern, but it is
For larger easy areas, use the standard patterns of movement: “flip-flopped” to continually cross the previous S pattern along the corridor’s
centerline. This final series of the S pattern curves back along the edge areas
Ɣ The first series (pattern) of passes is applied lengthwise, parallel with the longest skipped by the second series.
spread of the site; gradually progressing across the site’s width, with each
successive pass. Maintenance and Cost
Ɣ The second series runs obliquely, crossing the first series at an angle of Once the two-phase practice of Deep Ripping and Decompation is completed, two items are
about 45 degrees. essential for maintaining a site’s soil porosity and permeability for infiltration. They are: planting
and maintaining the appropriate ground cover with deep roots to maintain the soil structure (see
Ɣ The third series runs at right angle (or 90 degrees), to the first series to complete Figure 15); and keeping the site free of traffic or other weight loads.
the fracturing and shattering on severely compacted sites, and avoid leaving large
unbroken blocks of compressed soil material. (In certain instances, the third series Note that site-specific choice of an appropriate vegetative ground-cover seed mix, including the
may be optional, depending on how thoroughly the first two series loosen the proper seeding ratio of one or more perennial species with a deep taproot system and the proper
material and eliminate large chunks/blocks of material as verified by tests with a ¾- amount of lime and soil nutrients (fertilizer mix) adapted to the soil-needs, are basic to the final
inch cone penetrometer.) practice of landscaping, i.e: surface tillage, seeding/planting/fertilizing and culti-packing or
mulching is applied. The "maintenance" of an effectively deep-ripped and decompacted area is
generally limited to the successful perennial (long-term) landscape ground cover; as long as no
weight-bearing force of soil compaction is applied.
Fig. 13. The same deep, angled-leg subsoiler
Fig. 12. Moderately dry topsoil is being
shown in Fig. 7 is engaged at maximum
replaced on the affected site now that Phase 1
depth for Phase 2, decompaction (deep
deep ripping of the compressed subsoil is
soiling), of the replaced topsoil and the upper Fig. 15. The same site as Fig. 14 after deep
complete. Fig. 14. The severely compacted soil of a
subsoil materials. ripping of the exposed subsoil, topsoil
temporary construction yard used daily by replacement, decompaction through the
heavy equipment for four months; shown topsoil and upper subsoil and final surface
before deep ripping, topsoil replacement, and tillage and revegetation to maintain soil
Corridors
decompaction. permeability and infiltration.
In long corridors of limited width and less maneuverability than larger sites, e.g.: along
compacted areas used as temporary construction access, a modified series of pattern passes
are used.
Ɣ First, apply the same initial lengthwise, parallel series of passes described above.
9 10
Page 308 of 1493
Page 309
The Deep Ripping and Decompaction practice is, by necessity, more extensive than periodic Resources
subsoiling of farmland.The cost of deep ripping and decompacting (deep subsoiling), will vary
according to the depth and severity of soil-material compression and the relative amount of Publications:ȱ
tractor and implement time that is required. In some instances, depending on open ȣȱAmericanȱȱSocietyȱofȱȱAgriculturalȱEngineers.ȱ1971.ȱȱCompactionȱofȱȱAgriculturalȱȱSoils.ȱȱASAE.ȱ
maneuverability, two-to-three acres of compacted project area may be deep-ripped in one day. In ȱ
other situations of more severe compaction and - or less maneuverability, as little as one acre may ȣȱBrady,ȱN.C.,ȱandȱR.R.ȱWeil.ȱ2002.ȱȱTheȱȱNatureȱȱandȱȱPropertiesȱȱofȱȱSoils.ȱ13thȱed.ȱPearsonȱEducation,ȱInc.ȱ
be fully ripped in a day. Generally, if the Phase 1) Deep Ripping is fully effective, the Phase 2) ȱ
Decompaction should be completed in 2/3 to 3/4 of the time required for Phase 1. ȣȱBaver,ȱL.D.ȱ1948.ȱSoilȱPhysics.ȱJohnȱWileyȱ&ȱSons.ȱ
ȱ
Using the example of two acres of Phase 1) Deep Ripping in one day, at $1800 per day, the net ȣȱCarpachi,ȱN.ȱ1987ȱ(1995ȱfifthȱprinting).ȱExcavationȱandȱGradingȱHandbook,ȱRevised.ȱȱ2ndȱed.ȱCraftsmanȱBookȱ
cost is $900 per acre. If the Phase 2) Decompacting or deep subsoiling takes 3/4 the time as Phase Companyȱ
1, it costs $675 per acre for a combined total of $1575 per acre to complete the practice (these ȣȱEllis,ȱB.ȱ(Editor).ȱ1997.ȱȱSafeȱ&ȱEasyȱLawnȱCare:ȱȱTheȱCompleteȱGuideȱtoȱOrganicȱLowȱMaintenanceȱLawn.ȱȱ
figures do not include the cost of the separate practice of topsoil stripping and replacement). Due HoughtonȱMifflin.ȱ
to the many variables, it must be recognized that cost will be determined by the specific conditions ȱ
or constraints of the site and the availability of proper equipment. ȣȱ Harpstead,ȱ M.I.,ȱ T.J.ȱ Sauer,ȱ andȱ W.F.ȱ Bennett.ȱ 2001.ȱ ȱ Soilȱ Scienceȱ Simplified.ȱ 4thȱ ed.ȱ Iowaȱ Stateȱ Universityȱȱ
Press.ȱ
ȱ
ȣȱ ȱ Magdoff,ȱ F.,ȱ ȱ andȱ ȱ H.ȱ vanȱ Es.ȱ ȱ 2000.ȱ ȱ Buildingȱ Soilsȱ ȱ forȱ ȱ Betterȱ Crops.ȱ 2ndȱ ed.ȱ Sustainableȱ Agriculturalȱ
Networksȱ
ȱ
ȣȱȱMcCarthy,ȱD.F.ȱ1993.ȱEssentialsȱofȱSoilȱMechanicsȱandȱFoundations,ȱBasicȱGeotechnicsȱ4thȱed.ȱRegents/Prenticeȱ
Hall.ȱ
ȱ
ȣȱȱȱȱȱȱPlaster,ȱE.J.ȱ1992.ȱSoilȱScienceȱ&ȱManagement.ȱ3rdȱed.ȱDelmarȱPublishers.ȱ
ȱ
ȣȱ ȱ ȱ Unionȱ Gasȱ Limited,ȱ Ontario,ȱ Canada.ȱ 1984.ȱ Rehabilitationȱ ofȱ Agriculturalȱ Lands,ȱ DawnȬKerwoodȱ ȱ Loopȱȱ
Pipeline;ȱȱȱTechnicalȱȱȱReport.ȱȱȱEcologicalȱȱȱServicesȱȱforȱȱPlanning,ȱȱLtd.;ȱRobinson,ȱMerrittȱ&ȱDevries,ȱ
Ltd.ȱandȱSmith,ȱHoffmanȱAssociates,ȱLtd.ȱ
ȱ
ȣȱȱȱUSȱDepartmentȱofȱAgricultureȱinȱcooperationȱwithȱCornellȱUniversityȱAgriculturalȱExperimentȱȱStation.ȱȱ
Variousȱyears.ȱȱSoilȱȱSurveyȱofȱȱ(variousȱnames)ȱȱCounty,ȱȱNewȱYork.ȱUSDA.ȱ
ȱ
InternetȱAccess:ȱ
ȣȱȱȱȱExamplesȱofȱimplements:ȱȱ
ȱVȬRippers.ȱȱAccessȱbyȱȱinternetȱsearchȱofȱJohnȱDeereȱAgȱȬNewȱEquipmentȱȱȱforȱȱ915ȱȱ(largerȬframeȱmodel)ȱȱVȬ
Rippe;ȱȱand,ȱȱȱforȱ913ȱȱ(smallerȬframeȱmodel)ȱVȬRipper.ȱȱDeep,ȱangledȬlegȱsubsoiler.ȱȱAccessȱȱbyȱȱinternetȱ
searchȱȱof:ȱBighamȱȱBrothersȱShearȱBoltȱȱParatillȬSubsoiler.ȱ
http://salesmanual.deere.com/sales/salesmanual/en_NA/primary_tillage/2008/feature/rippers/915v_pattern_frame.html?sbu=a
g&link=prodcat LastȱvisitedȱMarchȱ08.ȱ
ȱ
ȣȱ Soilsȱ dataȱ ofȱ USDAȱ Naturalȱ Resourcesȱ Conservationȱ Service.ȱ NRCSȱ Webȱ Soilȱ Survey.ȱȱȱȱȱȱȱȱȱȱȱȱȱȱ
http://websoilsurvey.nrcs.usda.gov/app/ȱȱȱandȱȱUSDAȬNRCSȱȱOfficialȱȱSoilȱȱSeriesȱDescriptions;ȱViewȱbyȱ
Name.ȱhttp://ortho.ftw.nrcs.usda.gov/cgiȬbin/osd/osdname.cgiȱ.ȱLastȱvisitedȱJan.ȱ08.ȱ
ȱ
ȣȱȱSoilȱȱpenetrometerȱȱinformation.ȱȱAccessȱȱbyȱȱȱinternetȱȱsearchesȱȱof:ȱȱȱDiagnosingȱSoilȱCompactionȱȱȱusingȱȱaȱ
Penetrometerȱ(soilȱcompactionȱtester),ȱPSUȱExtension;ȱȱasȱȱwellȱȱasȱDickeyȬjohnȱSoilȱCompactionȱTester.ȱ
http://www.dickey-johnproducts.com/pdf/SoilCompactionTest.pdf and http://cropsoil.psu.edu/Extension/Facts/uc178pdf Lastȱ
visitedȱSept.ȱ07ȱ
11 12
Page 309 of 1493
Page 310
Page 310 of 1493
Page 311
Appendix f:
Labella certifying
professionals letter
Page 311 of 1493
Page 312
Page 312 of 1493
Page 313
February 21, 2025
RE: LaBella Certifying Professionals for NYSDEC SPDES GP-0-25-001
To Whom it May Concern:
In accordance with the NYSDEC SPDES General Permit GP-0-25-001, Part VII.J.2, Kristopher Winkler,
PE, a New York State Qualified Professional employed by LaBella Associates, is duly authorized to sign
and seal Stormwater Pollution Prevention Plans (SWPPPs), Notice of Intents (NOIs) and Notice of
Terminations (NOTs).
Respectfully submitted,
LaBella Associates
Timothy Webber Kristopher Winkler, PE
Vice President, Civil Division Director Senior Civil Engineer
Team Leader
Page 313 of 1493
Page 314
Page 314 of 1493
Page 315
Appendix G:
Nysdec spdes general permit
gp-0-25-001
Page 315 of 1493
Page 316
Page 316 of 1493
Page 317
Page 317 of 1493
Page 318
Page 318 of 1493
Page 319
Page 319 of 1493
Page 320
Page 320 of 1493
Page 321
Page 321 of 1493
Page 322
Page 322 of 1493
Page 323
Page 323 of 1493
Page 324
Page 324 of 1493
Page 325
Page 325 of 1493
Page 326
Page 326 of 1493
Page 327
Page 327 of 1493
Page 328
Page 328 of 1493
Page 329
Page 329 of 1493
Page 330
Page 330 of 1493
Page 331
Page 331 of 1493
Page 332
Page 332 of 1493
Page 333
Page 333 of 1493
Page 334
Page 334 of 1493
Page 335
Page 335 of 1493
Page 336
Page 336 of 1493
Page 337
Page 337 of 1493
Page 338
Page 338 of 1493
Page 339
Page 339 of 1493
Page 340
Page 340 of 1493
Page 341
Page 341 of 1493
Page 342
Page 342 of 1493
Page 343
Page 343 of 1493
Page 344
Page 344 of 1493
Page 345
Page 345 of 1493
Page 346
Page 346 of 1493
Page 347
Page 347 of 1493
Page 348
Page 348 of 1493
Page 349
Page 349 of 1493
Page 350
Page 350 of 1493
Page 351
Page 351 of 1493
Page 352
Page 352 of 1493
Page 353
Page 353 of 1493
Page 354
Page 354 of 1493
Page 355
Page 355 of 1493
Page 356
Page 356 of 1493
Page 357
Page 357 of 1493
Page 358
Page 358 of 1493
Page 359
Page 359 of 1493
Page 360
Page 360 of 1493
Page 361
Page 361 of 1493
Page 362
Page 362 of 1493
Page 363
April 20, 2026
Jeffery Schieber
Code Enforcement Officer
1250 Union Road – Room 210
West Seneca, New York 14224
RE: 2544 Clinton Street – Home Leasing Development
Site Plan Review Application Package
Mr. Schieber:
On behalf of Home Leasing Development, I am pleased to submit a Site Plan Review Application
Package for the proposed affordable multi-family housing project “West Seneca Apartments”,
located on one parcel at 2544 Clinton Street.
Home Leasing is seeking Site Plan Approval to develop the project on an approximately 12.7-acre
site. (TA#124.00-2-5). The project proposes the construction of 75-units spanning across two
buildings – the existing mansion on site (15-units) and a new 3-story multifamily apartment building
(60-units) with associated parking, site and drainage improvements.
The original project was approved by the Town Board for Rezoning, Special Use Permit and SEQR
Negative Declaration on 1/27/2025. The revised layout for the project was approved by the Town
Board for an Amendment to the existing Special Use Permit on 2/9/2026.
This package includes a fully engineered site package for Planning Board Review.
Per Town of West Seneca Code – Site Plan Review Criteria - “Planning Board Actions; project review
criteria” (Code Section 102-12 (A & B)), we offer the following responses:
(1) Conformance with this chapter and other adopted Town plans, an approved development
plan that includes the subject site, if one exists, and all other applicable laws;
To the best of our knowledge, the project is in compliance with all regulations of the R-50 zoning
district and supplemental multifamily housing requirements. Based on the 2016 Comprehensive
Plan – Neighborhoods – Section A, B and C – the plan supports continuing to build affordable
housing with West Seneca.
(2) Compatibility of the proposed development with the natural features of the land and the
environmental attributes of the site;
The project is designed to preserve and avoid disturbance in the environmentally sensitive areas
located on the site. There will be no disturbance within the archeological buffer area and 100-year
floodplain. All development is located in FEMA Zone X and areas of minimal flood hazard.
Development is located away from Cayuga creek to maintaining an existing natural buffer. The site
layout is designed to maintain existing trees/vegetation along Clinton Street and along the perimeter
of the parcel.
Page 363 of 1493
Page 364
(3) The project's compliance with grading and drainage requirements of the Town;
The project is designed to comply with the town standards. Stormwater is designed to meet NYS
Stormwater Design Manual standards, grading and disturbance will be limited to areas as required
for installation of stormwater practices and to achieve positive drainage away from buildings/across
hardscape areas.
(4) The project's compliance with the Town's Flood Damage Prevention Law;
The project is located partially within FEMA Zone X, with the majority of the development sitting
outside of all mapped zones. Per Town Code Section 77-12 – A floodplain development permit is not
required for development within Zone X.
(5) The general layout and design of buildings, lighting, signage, open space and development
features consistent with reasonable planning principles;
The proposed singular new 3-story building (60-units) along with utilizing the existing mansion for an
additional 15-units was chosen to lessen the overall footprint on the property. The existing
landscaping and stone wall are being preserved to the greatest extent possible, providing screening
of the new building and parking lot from Clinton Street. Roads and parking lots have been designed
to meet town standards and allow for proper emergency access.
(6) The location and design of vehicular entrances/exits, including emergency access and fire
lanes, in relation to the street system, traffic circulation and control within the site, and
coordination of access points and circulation with adjoining properties;
The existing entrance to the property is being utilized with minor widening to allow for adequate
space for emergency vehicles. The parking lot and roadways are designed to meet NYS Fire Code
including: fire lanes for aerial apparatus access along two sides of building, fire turnarounds, a
looped parking lot, and two new private fire hydrants.
(7) The provision and protection of pedestrian movement on the site and coordination of
pedestrian movement on adjoining properties and the street system;
Sidewalks are provided throughout the proposed development. All sidewalks (as shown on the plans)
are ADA compliant. Sidewalk access is provided out to Clinton Street and a new segment of sidewalk
within the ROW and extends to the west to the limits of the existing guardrail, in accordance with
previous coordination with NYSDOT.
(8) The location, design, layout and adequacy of parking, loading and stacking areas, including
the provision of opportunities for handicapped parking;
The parking lot provides the code required 170 spaces – including 20 visitor spaces. The submitted
plans proposes 20-banked parking spaces to be constructed in the future if demand requires it. ADA
and EV spaces are provided at both buildings, adjacent to the accessible entrances for the
respective buildings.
(9) Provision of landscaping, screening and buffers to complement development and protect
adjacent uses and public rights-of-way from unsightliness, noise, glare and other nuisances.
Such elements shall also be used to promote the availability of green space in nonresidential
development and recreation space in residential development to avoid a continuous paved
or built environment;
2
Page 364 of 1493
Page 365
The project layout was designed to preserve open space. Existing natural buffers will be maintained
along the north, east and west boundaries of the site. Trees along the south (Clinton Street) will be
maintained – other than removal required for the widening of the driveway. A patio area and
playground are provided, along with landscaped islands throughout the parking lot. Trees will be
added along the entrance drive to provide additional screening of the new development from Clinton
Street.
(10) Adequate provision of drainage and stormwater management facilities;
A Stormwater Pollution Prevention Plan (SWPPP) was prepared for the site and is included in this
submission package. The site is designed per the NYS Stormwater Design Manual standards and
NYSDEC Standards and Specifications for Erosion and Sediment Control. Several stormwater
practices are proposed for the site including bioretention areas, underground stormwater chambers
and use of a hydrodynamic separator (water quality unit).
(11) Adequacy of sewer and water facilities, fire protection and conformance with Town
regulations for the provision and construction of those services;
A full sewer report (including flow testing) has been completed. Findings of the monitoring was
reviewed and approved by Erie County Sewer, concluding that the sewer has sufficient capacity to
support the proposed project. Existing flow tests for the watermain on Clinton Street have been
reviewed and it was determined that the existing watermain has sufficient pressure to support the
proposed project. Both buildings will be designed to meet NYS Fire Code (for rehabilitation of the
existing building and new construction).
(12) Where appropriate and applicable, the concurrence of Town agencies, New York State
Department of Transportation, New York State Department of Environmental Conservation
and other county or state agencies, as appropriate; and
Correspondence with reviewing agencies will be/has been provided to the town as a part of the site
plan review. To date NYSDOT and SHPO correspondence was provided as part of SEQR review and
issuance of the Special Use Permit.
(13) Meeting the requirements for a site plan, as identified in this chapter.
This application package as submitted meets the requirements of the Town Code, to the best of our
knowledge.
Included for your consideration in the Site Plan Review are the following items:
• Site Plan Application
• Civil Plan Set
• Architectural Elevations & Rendering
• Preliminary ALTA
• Engineering Report
• SWPPP
• Check – Review Fee (mailed separately)
3
Page 365 of 1493
Page 366
We look forward to presenting this project to the Planning Board on May 14th, 2026. If you have any
questions or need any additional information, please feel free to contact me at 585-770-2525 or
[email protected].
Respectfully submitted,
LaBella Associates
Shelby Vakiener, Civil Engineer
4
Page 366 of 1493
Page 367
4/20/2026
West Seneca Apartments
2544 Clinton Street - Nearest cross street - Lakeside Court ( +/- 750 LF to the East)
Home Leasing - (contact - Angela Eicholtz) (248) 978-4420
45 East Avenue, 2nd Floor, Rochester, NY 14604
Clinton Street Realty Holdings
Labella Associates DPC - (contact - Shelby Vakiener) (585) 454-6110
300 Pearl Street, Suite 130, Buffalo, NY 14202
124.00-2-5
Construction of a new multifamily housing project with 75 total units. Includes a new +/- 75,900 SF building with 60 units and the re-purposing of the
existing mansion on site with 15 units. Also includes, driveway, parking, stormwater management facilities
12.7 (to creek CL) N/A
Clinton Street: +/- 205 LF of frontage
R-50 R-50
Commercial
Residential - Mutlifamily
Zoning: R75(S), R-100 A, R-100A(S), C-2, C-2(S)
Uses include: 1 Family Residential, 2 Family Residential, Residential vacant land, Residential w/ community use, warehouse, converted residential
X X
Special Use Permit - Issued by Town Board on 2/9/2026
Page 367 of 1493
Page 368
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
Page 368 of 1493
Page 369
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
Page 369 of 1493
Page 370
SV
FUTURE
FUTURE
SV
SV
SV
SV
SV
SV
SV
SV
SV
Shelby Vakiener - agent for applicant West Seneca Apartments
2544 Clinton Street
Page 370 of 1493
Page 371
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
FUTURE
Page 371 of 1493
Page 372
SV
SV
SV
SV
n/a
SV
SV
SV
SV
n/a
n/a
SV
SV
SV
n/a
SV
Page 372 of 1493
Page 373
SV
SV
FUTURE
SV
Page 373 of 1493
Page 374
Page 374 of 1493
Page 375
ISSUED FOR SITE PLAN APPROVAL
WEST SENECA APARTMENTS
2544 CLINTON ST,
WEST SENECA, NY 14224
APRIL 2026
PROJECT LOCATION
PROJECT NO: 2241067
HOME LEASING
LOCATION MAP
N.T.S.
2544 CLINTON ST, WEST SENECA, NY 14224
HOME LEASING
75 S CLINTON AVE SUITE 700,
WEST SENECA APARTMENTS
ROCHESTER, NEW YORK 14604
PROJECT NO: 2241067
APRIL 2026
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
Page 375 of 1493
Page 376
NOT FOR CONSTRUCTION
GENERAL NOTES UTILITY NOTES LEGEND
1. THE CONTRACTOR ALONE SHALL BE RESPONSIBLE TO LOCATE UTILITIES OUTSIDE THE 1. CONTRACTOR SHALL COORDINATE INSTALLATION OF WATER MAIN / WATER SERVICE
RIGHT-OF-WAY INCLUDING PRIVATE ROADS. WITH ERIE COUNTY WATER AUTHORITY AND THE ERIE COUNTY HEALTH DEPARTMENT EXISTING PROPOSED DESCRIPTION EXISTING PROPOSED DESCRIPTION
(ECDOH). NO WORK SHALL BEGIN ON THE WATER MAIN / WATER SERVICE WITHOUT
2. SITE DRAINAGE, INCLUDING THE PROJECT SITE AND ADJACENT PRIVATE AND PUBLIC
ECWA AND ECDOH SIGNATURES ON THE UTILITY PLAN.
ROADWAYS, DRIVES, PARKING AREAS OR PROPERTIES SHALL BE MAINTAINED FLOODZONE END SECTION
300 Pearl Street, Suite 130
THROUGHOUT THE CONSTRUCTION PERIOD. 2. CONTRACTOR SHALL COORDINATE INSTALLATION OF SANITARY MAIN / SANITARY
SERVICE WITH ERIE COUNTY PURE WATERS (ECPW). NO WORK SHALL BEGIN ON THE ARCHAEOLOGICAL BUFFER CATCH BASIN Buffalo, NY 14202
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING ALL MATERIALS, TOOLS AND 716-551-6281
SANITARY MAIN / SANITARY SERVICE WITHOUT ECPW SIGNATURE ON THE UTILITY PLAN.
EQUIPMENT, INCLUDING SPECIAL CUTTING DEVICES, NECESSARY TO PERFORM THE TREE REMOVAL Y DRAIN BASIN
WORK CONTAINED IN THIS CONTRACT.
X X X X UTILITY REMOVAL C INLET MANHOLE
labellapc.com
4. THE SIZES AND MATERIAL OF CONSTRUCTION OF WATER MAINS, SANITARY SEWERS AND
STORM SEWERS TO REMAIN ARE REPUTED. THE CONTRACTOR SHALL VERIFY SIZES OF SAWCUT D D STORM MANHOLE
ALL UTILITIES WHERE CONNECTIONS TO SAID EXISTING UTILITIES ARE REQUIRED.
EXCAVATION TO VERIFY THESE UTILITIES SHALL BE MADE AT NO ADDITIONAL COST TO
GRADING NOTES TREE PROTECTION S SANITARY MANHOLE
THE OWNER.
1. THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS OF OSHA, AND ANY OTHER
AGENCY HAVING JURISDICTION WITH REGARD TO SAFETY PRECAUTIONS WITH CHAIN LINK FENCE S INLET DRYWELL
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING SITE AMENITIES NOT DESIGNATED FOR
REMOVAL. TRENCHING OPERATIONS. THE REQUIREMENTS SET FORTH HEREIN ARE INTENDED TO
BOARD-ON-BOARD FENCE C0
CLEAN OUT
SUPPLEMENT REQUIREMENTS ESTABLISHED BY THESE AGENCIES. IN THE CASE OF A
6. UNLESS OTHERWISE INDICATED ON THE PLANS OR DIRECTED BY THE CONFLICT BETWEEN REQUIREMENTS OF OTHER JURISDICTIONAL AGENCIES AND THESE
GUARD RAIL DS DOWN SPOUT
ARCHITECT/ENGINEER, THE CONTRACTOR IS RESPONSIBLE FOR PRESERVING AND DOCUMENTS, THE MORE STRINGENT REQUIREMENT ON THE CONTRACTOR SHALL APPLY.
PROTECTING FROM DAMAGE ALL TREES, SHRUBS AND PLANTS IN THE VICINITY OF THE
2. SHEETING, IF REQUIRED DURING CONSTRUCTION, IS CONSIDERED TO BE PART OF THIS TREE/VEGETATION LIMIT HYDRANT
PROPOSED WORK.
CONTRACT AND SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
7. THE CONTRACTOR SHALL PROTECT AND SUPPORT ALL EXISTING UTILITIES DESIGNATED BLDG BUILDING/STRUCTURE VALVE
TO REMAIN FOR THE DURATION OF THE CONTRACT. 3. ALL TRENCHES THROUGH PAVEMENT SHALL BE SAW CUT PRIOR TO EXCAVATION AND
AGAIN PRIOR TO PAVEMENT RESTORATION. PROPERTY LINE FLOW ARROW
8. ANY SITE AMENITY, UTILITY, STREET APPURTENANCE, OR OTHER ITEM WHICH BECOMES EXP: EXP:
DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR 4. CONTRACTOR SHALL ADJUST THE RIMS OF ALL MANHOLES, CATCH BASINS, VALVE EASEMENTS TELEPHONE LINE
REPLACED IN-KIND BY THE CONTRACTOR AS DETERMINED BY THE PROJECT MANAGER BOXES AND OTHER UTILITY SITE STRUCTURES TO MEET FINISHED GRADE IN AREAS
OR ARCHITECT/ENGINEER AND AT NO ADDITIONAL COST TO THE OWNER. REQUIRING REPAVING OR REGRADING AS PART OF THE WORK, INCLUDING THOSE THAT RIGHT-OF-WAY OVERHEAD ELECTRIC CERTIFICATE OF AUTHORIZATION NUMBER:
MAY NOT BE SHOWN ON THE PLANS. PROFESSIONAL ENGINEERING: 0021272
RETAINING WALL UE UE UNDERGROUND ELECTRIC LAND SURVEYING: 0021271
5. VOIDS LEFT BY UTILITY OR STRUCTURE REMOVAL OR GRUBBING OPERATIONS SHALL BE
GEOLOGICAL: 0021659
BACKFILLED AND PROPERLY COMPACTED WITH STRUCTURAL FILL (NYSDOT ITEM 304.12) BOLLARD GAS LINE
SURVEY NOTES IN AREAS UNDER AND WITHIN 5 FEET HORIZONTALLY OF ALL STRUCTURES, BUILDINGS
AND PAVEMENTS. IN GRASSED AREAS, VOIDS LEFT SHALL BE FILLED AND PROPERLY FLAG
FLAG POLE
POLE SA SANITARY LINE
COMPACTED WITH SUITABLE ON-SITE OR IMPORTED EARTHEN BACKFILL. ALL It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO
DISTURBED AREAS SHALL BE RESTORED. SIGN ST STORM LINE Sec. 7307, for any person, unless acting under the direction of a licensed
ALLOWANCE WILL BE MADE FOR ADDITIONAL COSTS DUE TO CONTRACTOR'S FAILURE TO
architect, professional engineer, or land surveyor, to alter an item in any
VERIFY EXISTING CONDITIONS. 6. THE CONTRACTOR SHALL DEWATER ALL EXCAVATIONS TO PREVENT THE INTRODUCTION DECIDUOUS TREE UD UD UD STORM UNDERDRAIN PIPE way. If an item bearing the seal of an architect, engineer, or land surveyor
OF GROUNDWATER INTO THE TRENCHES/EXCAVATIONS. PROVIDE ALL EQUIPMENT is altered; the altering architect, engineer, or land surveyor shall affix to
2. THE CONTRACTOR SHALL LOCATE, MARK, SAFEGUARD AND PRESERVE ALL SURVEY
NECESSARY TO MAINTAIN THE GROUNDWATER LEVEL AS NECESSARY. CONIFEROUS TREE the item their seal and notation "altered by" followed by their signature and
MARKERS AND RIGHT-OF-WAY MARKERS IN THE AREA OF CONSTRUCTION. FS WATER FIRE SERVICE LINE
7. THE CONTRACTOR SHALL PLACE AT MINIMUM 6 INCHES OF CLEANED SCREENED date of such alteration, and a specific description of the alteration.
3. ANY IRON PINS, MONUMENTS OR OTHER ITEMS DEFINING PROPERTY LINES WHICH ARE TREE STUMP W WATER LINE
TOPSOIL IN ALL DISTURBED AREAS PRIOR TO SEEDING.
DISTURBED BY CONSTRUCTION OPERATIONS SHALL BE PROPERLY TIED AND
ACCURATELY RESET BY A NYS LICENSED SURVEYOR UPON COMPLETION OF THE WORK. OUTLET PROTECTION 510 MAJOR CONTOUR © 2024
2026 LaBella Associates
4. HORIZONTAL DATUM BASED OFF NAD83. BIORETENTION 509 MINOR CONTOUR
5. VERTICAL BASED OFF OF NAVD88.
EROSION AND SEDIMENT CONTROL NOTES BOLLARD LIGHT POLE ℄ OF DRAINAGE SWALE
LIGHT POLE
1. ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH NEW YORK EROSION FENCE
DEMOLITION NOTES STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL, AND LOCAL
GOVERNING SOIL AND WATER CONSERVATION AGENCY RECOMMENDATIONS AND
SINGLE
LIGHT POLE DOUBLE FLOW/SLOPE DIRECTION
HOME LEASING
STANDARDS. CONTRACTOR SHALL SUBMIT PROPOSED EROSION CONTROL PLAN 75 S CLINTON AVE SUITE 700,
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO UTILITY POLE
INCLUDING SEQUENCING OF WORK TO THE ENGINEER FOR REVIEW PRIOR TO START OF SILT SOCK INLET PROTECTION ROCHESTER, NEW YORK 14604
ALLOWANCE WILL BE MADE FOR ADDITIONAL COSTS DUE TO CONTRACTOR'S FAILURE TO
WORK.
VERIFY EXISTING CONDITIONS AND DIMENSIONS. HH HANDHOLE SILT FENCE INLET PROTECTION
2. UTILIZE CONSTRUCTION METHODS/TECHNIQUES, WHICH WILL LIMIT THE EXPOSED
2. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY DIG SAFE
EARTHEN AREAS AND MINIMIZE THE EFFECT OF EARTH DISTURBANCE ACTIVITIES ON SOIL E MANHOLE CHECK DAM
NEW YORK AT 811 TO REQUEST UTILITY STAKEOUT OF ALL PUBLIC UTILITIES.
EROSION. THE AREA OF DISTURBANCE SHALL BE LIMITED TO A MAXIMUM OF 5 ACRES
3. WORK ASSOCIATED WITH THIS CONTRACT WILL OCCUR AT AN ACTIVE AND FUNCTIONAL UNLESS OTHERWISE APPROVED BY THE ENGINEER.
FACILITY. CONTRACTOR SHALL COORDINATE WITH THE OWNER TO MINIMIZE DISRUPTION
3. ALL SEDIMENTATION BARRIERS AND OTHER TEMPORARY OR PERMANENT MEASURES STABILIZED CONSTRUCTION ENTRANCE
TO THE OPERATIONS OF THE FACILITY. CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO
SHALL BE IN PLACE PRIOR TO THE START OF CONSTRUCTION. PLANS SHOW THE
PROVIDE A SAFE WORK SITE AND TO PROTECT THE PUBLIC, VISITORS AND EMPLOYEES
SUGGESTED MINIMUM MEASURES REQUIRED.
FROM HARM AS A RESULT OF HIS CONSTRUCTION ACTIVITIES.
4. REMOVAL OF ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES
4. THE HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING ABOVE GROUND AND
SHALL BE COMPLETED AT THE APPROVAL OF THE OWNER AND ENGINEER. THE COST OF
BELOW GROUND UTILITIES, STRUCTURES, AND APPURTENANCES SHOWN ON THE PLANS
REMOVING THESE MEASURES SHALL ALSO BE INCLUDED IN THE BID PRICE.
ARE APPROXIMATE AND ARE NOT GUARANTEED. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DETERMINING THE EXACT HORIZONTAL AND VERTICAL LOCATION OF 5. FOR THE DURATION OF THE PROJECT, THE CONTRACTOR SHALL PROTECT ALL ON-SITE,
ALL UTILITIES, STRUCTURES, AND APPURTENANCES IN THE PATH OF AND ADJACENT TO ADJACENT AND/OR DOWNSTREAM STORM/SANITARY SEWERS, AND/OR OTHER WATER
THE PROPOSED WORK. COURSES FROM CONTAMINATION BY WATER BORNE SILTS, SEDIMENTS, FUELS,
SOLVENTS, LUBRICANTS OR OTHER POLLUTANTS ORIGINATING FROM ANY WORK DONE
5. SITE DRAINAGE, INCLUDING THE PROJECT SITE AND ADJACENT PRIVATE AND PUBLIC
ON, OR IN SUPPORT OF THIS PROJECT.
ROADWAYS, DRIVES, PARKING AREAS OR PROPERTIES SHALL BE MAINTAINED
THROUGHOUT THE CONSTRUCTION PERIOD. 6. DURING CONSTRUCTION NO WET OR FRESH CONCRETE OR LEACHATE SHALL BE
ALLOWED TO ESCAPE INTO STORM/SANITARY SEWERS, DITCHES OR OTHER WATERS OF
6. CONTRACTOR SHALL PROTECT AND SUPPORT ALL EXISTING UTILITIES DESIGNATED TO
REMAIN FOR THE DURATION OF THE CONTRACT.
NEW YORK STATE, NOR SHALL WASHINGS FROM CONCRETE TRUCKS, MIXERS OR OTHER
DEVICES BE ALLOWED TO ENTER ANY STORM/SANITARY SEWERS, DITCHES, RIVERS, OR
DRAWING INDEX
7. THE CONTRACTOR SHALL NOTIFY THE LOCAL GOVERNMENT, LOCAL FIRE DEPARTMENT WATER COURSES.
AND THE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION (NYSDEC)
7. ALL EXCAVATED OR IMPORTED EARTHEN STOCKPILES SHALL BE SUITABLY STABILIZED
C001 GENERAL NOTES, LEGEND, AND DRAWING INDEX
AS NECESSARY AND SHALL OBTAIN ANY REQUIRED PERMITS PRIOR TO BEGINNING
WORK. COPIES OF ANY REQUIRED PERMITS SHALL BE PROVIDED TO THE OWNER PRIOR
AND PROTECTED BY SILT FENCE SO THAT IT CANNOT REASONABLY ENTER ANY WATER WEST SENECA APARTMENTS
BODY, OR STORM OR SANITARY SEWER.
TO BEGINNING THE WORK. C003 TOTAL LAND HOLDINGS 2544 CLINTON ST,
8. ALL METHODS AND EQUIPMENT PROPOSED BY THE CONTRACTOR TO ACCOMPLISH THE WEST SENECA, NY 14224
8. CONTRACTOR SHALL REMOVE FROM SITE, MATERIALS NOT INDICATED TO BE SALVAGED
WORK FOR EROSION AND POLLUTION CONTROL SHALL BE SUBJECT TO APPROVAL OF
INCLUDING ALL DEBRIS. ALL REMOVED MATERIALS SHALL BECOME THE PROPERTY OF
THE ENGINEER. C101 EXISTING CONDITIONS AND DEMOLITION PLAN
CONTRACTOR WHO SHALL LEGALLY DISPOSE OF SAME.
9. THE CONTRACTOR SHALL BE REQUIRED TO TREAT TRAVELED AREAS TO CONTROL DUST.
9. ALL TREES, SHRUBS AND PLANTS DESIGNATED TO REMAIN AND DISTURBED BY
CONSTRUCTION OPERATIONS, SHALL BE REPLACED IN-KIND AS DIRECTED BY THE
WATER SHALL BE APPLIED TO SUCH TRAVELED AREAS AS THE ARCHITECT/ENGINEER OR C102 EXISTING CONDITIONS AND DEMOLITION PLAN
OWNER'S DESIGNATED REPRESENTATIVE MAY DESIGNATE. THE NUMBER OF
ARCHITECT/ENGINEER AND/OR OWNER'S DESIGNATED REPRESENTATIVE AT NO
APPLICATIONS AND THE AMOUNT OF WATER SHALL BE BASED UPON FIELD AND
ADDITIONAL COST TO THE OWNER.
WEATHER CONDITIONS. C200 OVERALL SITE PLAN
10. THE CONTRACTOR SHALL MAINTAIN SAFE VEHICULAR AND PEDESTRIAN ACCESS TO THE
10. ALL AREAS OF SOIL DISTURBANCE RESULTING FROM THIS PROJECT WHICH WILL NOT BE
EXISTING BUILDINGS FOR THE DURATION OF THE CONTRACT.
SUBJECT TO FURTHER EARTHWORK OR CONSTRUCTION ACTIVITIES SHALL BE
11. WHEN EXISTING CONSTRUCTION WHICH IS TO REMAIN IS DAMAGED DURING THE PERMANENTLY SEEDED TO ESTABLISH GRASS, AND MULCHED WITH HAY OR STRAW C201 SITE PLAN
COURSE OF CONSTRUCTION AS A RESULT OF CONTRACTORS WORK, IT SHALL BE WITHIN ONE WEEK OF FINAL DISTURBANCE. MULCH SHALL BE MAINTAINED UNTIL A
REPAIRED AND/OR REPLACED WITH SIMILAR OR LIKE MATERIALS AS MUCH AS POSSIBLE, SUITABLE VEGETATIVE COVER IS ESTABLISHED. NO: DATE: DESCRIPTION:
AT NO COST TO THE OWNER. ALL REPAIRS AND/OR REPLACEMENTS WILL BE SUBJECT TO
C202 SITE PLAN
11. CONTRACTOR STAGING AREAS AND CONSTRUCTION ENTRANCE LOCATIONS SHALL BE Revisions
OWNERS APPROVAL.
COORDINATED WITH THE OWNER PRIOR TO START OF CONSTRUCTION. STABILIZED
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C001 GENERAL NOTES.dwg
12. COORDINATE LOCATION OF TEMPORARY CONSTRUCTION FENCE AND TEMPORARY STONE CONSTRUCTION ENTRANCE(S), AS SHOWN ON THE PLANS SHALL BE PROVIDED. ALL C203 FIRE TRUCK AND SITE EMERGENCY ACCESS PLAN
STAGING AREA WITH OWNER DISTURBED AREAS SHALL BE RESTORED. PROJECT NUMBER:
2241067
12. ALL CATCH BASINS/DRAINAGE INLETS SHALL HAVE STONED INLET PROTECTION AROUND C301 UTILITY PLAN
SITE NOTES THEM AND GEOTEXTILE FABRIC OVER THE GRATE TO PREVENT SEDIMENTATION FROM
ENTERING THE STORM SYSTEM.
DRAWN BY:
EMM / SCB
1. WELL COMPACTED SUBGRADE SHALL BE UTILIZED UNDERNEATH CONSTRUCTION OF 13. TILL ALL COMPACTED SOILS LOCATED IN LAWN AREAS TO RESTORE THE ORIGINAL C302 UTILITY PLAN REVIEWED BY:
PAVEMENT AND CONCRETE BASES. PROPERTIES OF THE SOIL PRIOR TO SEEDING. SRV / DPB
2. ALL STAKEOUT FOR THE PROPOSED SITE IMPROVEMENTS SHALL BE COMPLETED BY A
C401 GRADING, EROSION, AND SEDIMENT CONTROL PLAN ISSUED FOR:
NEW YORK STATE LICENSED LAND SURVEYOR. SITE PLAN APPROVAL
3. IF ANY DISCREPANCIES ARE NOTED BETWEEN THESE CONSTRUCTION DOCUMENTS AND
INFORMATION PROVIDED OR AN ERROR IS SUSPECT, IT SHALL BE IMMEDIATELY C402 GRADING, EROSION, AND SEDIMENT CONTROL PLAN DATE:
REPORTED TO THE CONSTRUCTION MANAGER AND LABELLA ASSOCIATES PROJECT 4/20/2026
MANAGER IN WRITING.
C501 CONSTRUCTION DETAILS DRAWING NAME:
4. ANY PROOF-ROLLING OF EXPOSED SUBBASE BY A MINIMUM 10 TON SMOOTH DRUM
ROLLER SHALL BE DONE UNDER THE GUIDANCE OF, AND OBSERVED BY, QUALIFIED
ENGINEERING PERSONNEL PRIOR TO PLACEMENT OF SUBBASE MATERIAL. THE ROLLER C502 CONSTRUCTION DETAILS
SHOULD BE OPERATED IN THE STATIC MODE AND COMPLETE AT LEAST TWO (2) PASSES
OVER THE EXPOSED SUBGRADES.
5. EXISTING WETLANDS DELINEATED BY XXXX ON XX/XX/XXXX.
C503 CONSTRUCTION DETAILS GENERAL NOTES, LEGEND,
6. PARCEL LINES AS SHOWN BY XXXX COUNTY GIS DATABASE, FOR THE TOWN OF XXXX.
C504 CONSTRUCTION DETAILS AND DRAWING INDEX
C505 CONSTRUCTION DETAILS
C506 CONSTRUCTION DETAILS
DRAWING NUMBER:
C507 CONSTRUCTION DETAILS
4/20/2026 1:17:05 PM
C508 CONSTRUCTION DETAILS
L501 LANDSCAPE DETAILS
C001
Page 376 of 1493
Page 377
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
C0
D
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SEE SHEETS:
© 2024
2026 LaBella Associates
C101
C201
HOME LEASING
C301 75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
C401
PROPOSED
3-STORY C0
BUILDING C0
± 25,000 SF FOOTPRINT
C0
C0
C0
S
C0
D D
C0 D D
SEE SHEETS:
C0
DS
C102 WEST SENECA APARTMENTS
C202 2544 CLINTON ST,
WEST SENECA, NY 14224
DS
C302
C0
C402
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C003 OVERALL SITE PLAN.dwg
D
15.7'
NO: DATE: DESCRIPTION:
Revisions
C0
PROJECT NUMBER:
2241067
D
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
TOTAL LAND HOLDINGS
N
1 TOTAL LAND HOLDINGS 0' 60' 120' 180'
C003 SCALE: 1" = 60'
DRAWING NUMBER:
4/20/2026 1:17:07 PM
C003
Page 377 of 1493
Page 378
DEMOLITION KEY NOTES
NOT FOR CONSTRUCTION
1 REMOVE AND DISPOSE OF ASPHALT PAVEMENT SECTION, FULL DEPTH
REMOVE AND DISPOSE OF BUILDING, STRUCTURES, AND FOUNDATIONS
2 (REFER TO ARCHITECTURAL DRAWINGS AND SOIL MANAGEMENT PLAN
(SMP) FOR WORK WITHIN ARCHAEOLOGICAL BUFFER AREA)
3 REMOVE AND DISPOSE OF CONCRETE SIDEWALK SECTION, FULL DEPTH 300 Pearl Street, Suite 130
Buffalo, NY 14202
4 FULL DEPTH SAWCUT
716-551-6281
5 REMOVE AND DISPOSE OF TREE AND STUMP labellapc.com
6 REMOVE AND DISPOSE OF STUMP 15
REMOVE EXISTING UNDERGROUND UTILITY. EXACT EXTENTS OF UTILITY
7 X X
REMOVAL TO BE DETERMINED IN FIELD.
8 REMOVE EXISTING UTILITY STRUCTURE
9 REMOVE AND DISPOSE OF MOUNTED BUILDING LIGHTS(TYP.)
2
10 REMOVE AND DISPOSE OF MAILBOX
REMOVE AND PROTECT PORTION OF EXISTING STONE WALL FOR
11
REINSTALLATION
12 REMOVE AND DISPOSE OF GATE EXP: EXP:
13 PROTECT EXISTING TREE
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
14 PROTECT EXISTING UTILITY
LAND SURVEYING: 0021271
PROTECT EXISTING FENCE. FENCE TO BE EVALUATED BY OWNER. SECTIONS GEOLOGICAL: 0021659
15
TO BE REPLACED AS DETERMINED BY OWNER.
16 REMOVE AND DISPOSE OF EXISTING FLAG POLE AND FOUNDATION It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
17 REMOVE AND DISPOSE OF EXISTING SIGN architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
18 REMOVE AND DISPOSE OF EXISTING HVAC UNITS
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
19 PROTECT EXISTING STONE WALL
© 2024
2026 LaBella Associates
DEMOLITION PLAN NOTE:
1. ALL STUMPS AND BRUSH MAY NOT BE BURIED IN THE TOWN AND TOPSOIL MAY NOT
BE REMOVED FROM THE WORK SITE WITHOUT A PERMIT.
6
2
HOME LEASING
15
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
X
1
X
X
X
X
X
7
X
X
X
X
X
X
X
X
7
X
X
5
X
X
X
X
X
WEST SENECA APARTMENTS
X
X
X
2544 CLINTON ST,
X
X
8
WEST SENECA, NY 14224
X
X
2
X
5
3
15
1 NO: DATE: DESCRIPTION:
Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C100 DEMO PLAN.dwg
PROJECT NUMBER:
2241067
15 DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
1
DRAWING NAME:
EXISTING CONDITIONS AND
DEMOLITION PLAN
MATCH TO SHEET: C102
6
17
DRAWING NUMBER:
4/20/2026 1:17:39 PM
N
1 EXISTING CONDITIONS AND DEMOLITION PLAN 0' 20' 40' 60'
C101 SCALE: 1" = 20'
C101
Page 378 of 1493
Page 379
NOT FOR CONSTRUCTION
MATCH TO SHEET: C101
6
300 Pearl Street, Suite 130
17 Buffalo, NY 14202
716-551-6281
labellapc.com
6
DS
3
15
5
1
3
3
18
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
DS PROFESSIONAL ENGINEERING: 0021272
9
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
9 way. If an item bearing the seal of an architect, engineer, or land surveyor
3 7
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
X
10
3
X
© 2024
2026 LaBella Associates
X
X
X
X
X
HOME LEASING
T
X
1
75 S CLINTON AVE SUITE 700,
X
X
ROCHESTER, NEW YORK 14604
X
X
X
X
X
X 7
X
X
X
X
X
T
X
X
X
X
X
X
X
X
8
T
9
FLAG
POLE 15
15
WEST SENECA APARTMENTS
T
2544 CLINTON ST,
WEST SENECA, NY 14224
DEMOLITION KEY NOTES
T
1 REMOVE AND DISPOSE OF ASPHALT PAVEMENT SECTION, FULL DEPTH
REMOVE AND DISPOSE OF BUILDING, STRUCTURES, AND FOUNDATIONS
2 (REFER TO ARCHITECTURAL DRAWINGS AND SOIL MANAGEMENT PLAN
(SMP) FOR WORK WITHIN ARCHAEOLOGICAL BUFFER AREA)
3 REMOVE AND DISPOSE OF CONCRETE SIDEWALK SECTION, FULL DEPTH
4 FULL DEPTH SAWCUT 11 12
T
11 NO: DATE: DESCRIPTION:
Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C100 DEMO PLAN.dwg
5 REMOVE AND DISPOSE OF TREE AND STUMP
11 19 14
19 11
6 REMOVE AND DISPOSE OF STUMP PROJECT NUMBER:
REMOVE EXISTING UNDERGROUND UTILITY. EXACT EXTENTS OF UTILITY
2241067
14 ±18'
7 X X
REMOVAL TO BE DETERMINED IN FIELD. ±21'
19 DRAWN BY:
8 REMOVE EXISTING UTILITY STRUCTURE EMM / SCB
19
REVIEWED BY:
SRV / DPB
9 REMOVE AND DISPOSE OF MOUNTED BUILDING LIGHTS(TYP.) ±85'
4 ISSUED FOR:
10 REMOVE AND DISPOSE OF MAILBOX SITE PLAN APPROVAL
REMOVE AND PROTECT PORTION OF EXISTING STONE WALL FOR DATE:
11
REINSTALLATION 4/20/2026
12 REMOVE AND DISPOSE OF GATE DRAWING NAME:
13 PROTECT EXISTING TREE
14 PROTECT EXISTING UTILITY
15
PROTECT EXISTING FENCE. FENCE TO BE EVALUATED BY OWNER. SECTIONS
TO BE REPLACED AS DETERMINED BY OWNER.
EXISTING CONDITIONS AND
16 REMOVE AND DISPOSE OF EXISTING FLAG POLE AND FOUNDATION DEMOLITION PLAN
17 REMOVE AND DISPOSE OF EXISTING SIGN
18 REMOVE AND DISPOSE OF EXISTING HVAC UNITS
DRAWING NUMBER:
19 PROTECT EXISTING STONE WALL
DEMOLITION PLAN NOTE:
4/20/2026 1:17:13 PM
1. ALL STUMPS AND BRUSH MAY NOT BE BURIED IN THE TOWN AND TOPSOIL MAY NOT N
BE REMOVED FROM THE WORK SITE WITHOUT A PERMIT.
1 EXISTING CONDITIONS AND DEMOLITION PLAN 0' 20' 40' 60'
C102 SCALE: 1" = 20'
C102
Page 379 of 1493
Page 380
NOT FOR CONSTRUCTION
C201
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
C0
D
labellapc.com
±103'
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
PROPOSED architect, professional engineer, or land surveyor, to alter an item in any
3-STORY C0
way. If an item bearing the seal of an architect, engineer, or land surveyor
BUILDING is altered; the altering architect, engineer, or land surveyor shall affix to
C0
the item their seal and notation "altered by" followed by their signature and
± 25,000 SF FOOTPRINT date of such alteration, and a specific description of the alteration.
±103'
C0
© 2024
2026 LaBella Associates
C0
C0
S
C0
HOME LEASING
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
D D
C0 D D
C202 C0
DS
±445'
DS
25-FT SIDE SETBACK
WEST SENECA APARTMENTS
C0
2544 CLINTON ST,
WEST SENECA, NY 14224
PROJECT DATA
PARCEL INFORMATION
APPLICANT HOME LEASING
PARCEL ADDRESS 2544 CLINTON STREET
SLB # 124.00-2-5
D PARCEL AREA (TOTAL) 12.7 ACRES
15.7'
TOTAL PROJECT AREA ±7.0 ACRES
EXISTING IMPERVIOUS NO: DATE: DESCRIPTION:
1.06 ACRES
WITHIN PROJECT AREA Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C200 SITE PLAN.dwg
C0
PROPOSED IMPERVIOUS
2.98 ACRES
WITHIN PROJECT AREA
PROJECT NUMBER:
TOTAL DISTURBANCE AREA ±5.7 ACRES
2241067
ZONING INFORMATION
DRAWN BY:
REQUIRED PROPOSED EMM / SCB
D CLASSIFICATION R-50 R-50 REVIEWED BY:
SRV / DPB
FRONT SETBACK 30 FT ±445 FT
ISSUED FOR:
30-FT FRONT SETBACK SIDE SETBACK 25-FT* ±103 FT
SITE PLAN APPROVAL
REAR SETBACK 40-FT** ±255 FT
DATE:
OPEN SPACE - 8.5 ACRES
4/20/2026
MAX BUILDING HEIGHT 40 FT ±37 FT
DRAWING NAME:
TOTAL APARTMENT UNITS 75
PARKING INFORMATION
REQUIRED PROPOSED
170 (INCLUDING 20
PARKING SPACES 170
BANKED SPACES)
*OR A DISTANCE EQUAL TO THE HEIGHT OF PRINCIPAL BUILDING, WHICHEVER IS
OVERALL SITE PLAN
GREATER.
**FOR MULTIFAMILY DWELLINGS, EACH SIDE YARD SHALL BE 25 FEET OR A
DISTANCE EQUAL TO ONE-HALF (1/2) THE HEIGHT OF SUCH BUILDING, WHICHEVER
IS GREATER. THE TOTAL OF THE TWO SIDE YARDS SHALL BE TWICE THAT REQUIRED
FOR ONE SIDE YARD. THE TOWN BOARD SHALL HAVE THE POWER TO REDUCE SAID
SIDE YARD REQUIREMENTS UPON SHOWING OF SPECIAL CIRCUMSTANCES OR
HARDSHIP.
***MULTIFAMILY DEVELOPMENTS REQUIRE VISITOR PARKING. BASED ON UNIT DRAWING NUMBER:
COUNT (74), 20 VISITOR SPACES ARE REQUIRED FOR THIS COMMUNITY.
4/20/2026 1:17:19 PM
N
1 OVERALL SITE PLAN 0' 40' 80' 120'
C200 SCALE: 1" = 40'
C200
Page 380 of 1493
Page 381
NOT FOR CONSTRUCTION
SITE KEY NOTES
SIGN SUMMARY
1 NEW STANDARD DUTY ASPHALT PAVEMENT NUMBER NAME IMAGE SIZE MUTCD NUMBER QUANTITY
COLORS
NEW YORK STATE
2 NEW CONCRETE SIDEWALK BLACK LETTERING ON
1b 'HANDICAP' 12" x 18" SYMBOL 6
WHITE BACKGROUND
S:\MFriedle\blueicon.jpg
3 NEW CONCRETE DUMPSTER PAD, SEE DETAIL STANDARD 30' 300 Pearl Street, Suite 130
20'
NO PARKING NO
PARKING RED LETTERING ON Buffalo, NY 14202
4 NEW CONCRETE PAD FOR TRASH COLLECTION 2b ANY 12" x 18" R7-1 3 716-551-6281
SIGN TIME WHITE BACKGROUND
5 NEW CONCRETE GENERATOR/TRANSFORMER PAD, SEE DETAIL labellapc.com
RED SIGN WITH WHITE 29 R2
6 NEW PATIO AREA 3 STOP SIGN 30" x 30" R1-1 4 8'
LETTERING
C0
D
7 NEW CONCRETE CURB
ELECTRIC BLACK LETTERING ON 66'
8 NEW FLUSH CONCRETE CURB
4 EV PARKING VEHICLE 12" x 18" 8
PARKING
ONLY WHILE
CHARGING
WHITE BACKGROUND
9 NEW CURB TRANSITION 31
24'
10a NEW TYPE A CONCRETE ACCESS RAMP
10b NEW TYPE B CONCRETE ACCESS RAMP 4
8'
5'
EXP: EXP:
R2
10c NEW TYPE C CONCRETE ACCESS RAMP
14'
26'
10d NEW TYPE D CONCRETE ACCESS RAMP 30
CERTIFICATE OF AUTHORIZATION NUMBER:
2
25 28 PROFESSIONAL ENGINEERING: 0021272
11 NEW DETECTABLE WARNING SYSTEM 9 LAND SURVEYING: 0021271
7
GEOLOGICAL: 0021659
12 NEW PLAYGROUND AREA, WITH POURED IN PLACE PLAY SURFACING
20
13 NEW 4-FT CHAIN LINK FENCE (CLF) 9 25 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
12
architect, professional engineer, or land surveyor, to alter an item in any
14 NEW YELLOW PAVEMENT MARKINGS (TYP.)
13 way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
15 NEW CROSSWALK the item their seal and notation "altered by" followed by their signature and
14 date of such alteration, and a specific description of the alteration.
16 NEW ADA PARKING SYMBOL (TYP.)
© 2024
2026 LaBella Associates
17 NEW ADA PARKING STRIPING (TYP.)
20
18 NEW DUAL EV CHARGING UNIT (TYP.)
2 5
19 NEW EV PARKING SYMBOL AND SIGNAGE (TYP.)
20 NEW 4-FT CLF SWING GATE
HOME LEASING
28 75 S CLINTON AVE SUITE 700,
21
BANKED PARKING - FUTURE PAVED PARKING (TO BE CONSTRUCTED ROCHESTER, NEW YORK 14604
IF DEMAND INCREASES) 7
18'
22 RECONSTRUCT STONE WALL WITH SALVAGED MATERIALS 7
28.5'
23 NEW DETECTABLE WARNING SYSTEM
1
24 NEW STOP BAR
18' TYP. 30' 18' TYP.
25 NEW LIGHT POLE (TYP.) SEE UTILITY PLAN
26 NEW 6-FT BOARD-ON-BOARD FENCING 19
4
27 NEW 3-FT BOARD-ON-BOARD MANDOOR
28 LANDSCAPED AREA
PROPOSED 4
29
STORMWATER MANAGEMENT PRACTICE - REFER TO 300 SERIES
SHEETS FOR UTILITY DESIGN
3-STORY C0
9' TYP.
4
30 NEW SHED BUILDING 4 C0
31 NEW SNOW STORAGE AREA ± 25,000 SF FOOTPRINT 6' 7
4
WEST SENECA APARTMENTS
28 28
4 2544 CLINTON ST,
1b 2b 1b 1b 2b 1b
9 WEST SENECA, NY 14224
18
25
C0
10c 10c 10c 28
31
6'
C0
2
9 9 28
18' TYP.
7 9' TYP. 7
28 10a
C0 11
S
R2
C0
7
8'
7 9
16 17 16 17
NO: DATE: DESCRIPTION:
15 Revisions
30'
14
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C200 SITE PLAN.dwg
24
R4
0' PROJECT NUMBER:
7 9 3
7 2241067
R1
5 '
R1
5' 7 7
29 DRAWN BY:
EMM / SCB
18' TYP.
28 REVIEWED BY:
28 D
28
D
28 SRV / DPB
30' 30'
10b ISSUED FOR:
5' 21 SITE PLAN APPROVAL
18' TYP.
25 25 25 25
DATE:
4/20/2026
5'
7
R1
R1
DRAWING NAME:
5'
C0 D D
9
1 15
30'
14
24
3 17 16
21'
9
10b 3 SITE PLAN
9
MATCH TO SHEET: C202
8'
R2
18' TYP.
29'
8 9 7 7 7
26 9 28 28
19 10c 10c 2
27 10c
6'
28 DRAWING NUMBER:
C0
5'
4/20/2026 1:17:52 PM
N
1 SITE PLAN 0' 20' 40' 60'
C201 SCALE: 1" = 20'
C201
Page 381 of 1493
Page 382
NOT FOR CONSTRUCTION
3 17 16 9
10b 3
9 21'
MATCH TO SHEET: C201
8'
R2
18' TYP.
29'
8 9 7 7 7
26 9 28 28 300 Pearl Street, Suite 130
19 10c 10c 2
27 10c
Buffalo, NY 14202
6'
28 716-551-6281
C0
5'
18 9 labellapc.com
4 4 1b 2b 1b 25
DS
5'
21
EXP: EXP:
2
CERTIFICATE OF AUTHORIZATION NUMBER:
DS 2 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
5'
25
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
SITE KEY NOTES Sec. 7307, for any person, unless acting under the direction of a licensed
C0 architect, professional engineer, or land surveyor, to alter an item in any
1 NEW STANDARD DUTY ASPHALT PAVEMENT R8 way. If an item bearing the seal of an architect, engineer, or land surveyor
5' 5' is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
2 NEW CONCRETE SIDEWALK
date of such alteration, and a specific description of the alteration.
29
3 NEW CONCRETE DUMPSTER PAD, SEE DETAIL
25 © 2024
2026 LaBella Associates
4 NEW CONCRETE PAD FOR TRASH COLLECTION
25 2
5 NEW CONCRETE GENERATOR/TRANSFORMER PAD, SEE DETAIL
6'
6 NEW PATIO AREA
7 HOME LEASING
18' TYP.
9' TYP. 10d
7 NEW CONCRETE CURB 10' 75 S CLINTON AVE SUITE 700,
5 9
ROCHESTER, NEW YORK 14604
8 NEW FLUSH CONCRETE CURB
10'
2 14
9
9 NEW CURB TRANSITION 9' 14 11
14
24'
D
10a NEW TYPE A CONCRETE ACCESS RAMP 24
31 3 15
10b NEW TYPE B CONCRETE ACCESS RAMP
10c NEW TYPE C CONCRETE ACCESS RAMP 11 1
25
29
10d NEW TYPE D CONCRETE ACCESS RAMP
R8
5'
10d
C0
11 NEW DETECTABLE WARNING SYSTEM
12 NEW PLAYGROUND AREA, WITH POURED IN PLACE PLAY SURFACING 9
13 NEW 4-FT CHAIN LINK FENCE (CLF)
25
14 NEW YELLOW PAVEMENT MARKINGS (TYP.)
15 NEW CROSSWALK
7
WEST SENECA APARTMENTS
16 NEW ADA PARKING SYMBOL (TYP.)
2544 CLINTON ST,
NEW ADA PARKING STRIPING (TYP.) 14 WEST SENECA, NY 14224
17
D
5' 30'
18 NEW DUAL EV CHARGING UNIT (TYP.)
19 NEW EV PARKING SYMBOL AND SIGNAGE (TYP.)
2
20 NEW 4-FT CLF SWING GATE
25
BANKED PARKING - FUTURE PAVED PARKING (TO BE CONSTRUCTED
21
IF DEMAND INCREASES)
9
22 RECONSTRUCT STONE WALL WITH SALVAGED MATERIALS 22
22 NO: DATE: DESCRIPTION:
23 NEW DETECTABLE WARNING SYSTEM Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C200 SITE PLAN.dwg
7 22
24 NEW STOP BAR 22 3 PROJECT NUMBER:
2241067
25 NEW LIGHT POLE (TYP.) SEE UTILITY PLAN 8' 9
R28 R2
' DRAWN BY:
26 NEW 6-FT BOARD-ON-BOARD FENCING 24 EMM / SCB
REVIEWED BY:
27 NEW 3-FT BOARD-ON-BOARD MANDOOR 7 SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
2' 5'
28 LANDSCAPED AREA 10b
STORMWATER MANAGEMENT PRACTICE - REFER TO 300 SERIES DATE:
29
SHEETS FOR UTILITY DESIGN 4/20/2026
30 NEW SHED 9 DRAWING NAME:
31 NEW SNOW STORAGE AREA
SIGN SUMMARY
NUMBER NAME IMAGE SIZE COLORS MUTCD NUMBER QUANTITY
NEW YORK STATE
SITE PLAN
BLACK LETTERING ON
1b 'HANDICAP' 12" x 18" SYMBOL 6
WHITE BACKGROUND
S:\MFriedle\blueicon.jpg
STANDARD
NO
NO PARKING PARKING RED LETTERING ON
2b ANY 12" x 18" R7-1 3
SIGN TIME WHITE BACKGROUND
DRAWING NUMBER:
RED SIGN WITH WHITE
3 STOP SIGN 30" x 30" R1-1 4
LETTERING
4/20/2026 1:18:01 PM
N
1 SITE PLAN 0' 20' 40' 60'
C202
ELECTRIC BLACK LETTERING ON
4 EV PARKING VEHICLE 12" x 18" 8 C202
PARKING
ONLY WHILE
CHARGING
WHITE BACKGROUND SCALE: 1" = 20'
Page 382 of 1493
Page 383
NOT FOR CONSTRUCTION
WEST SENECA FIRE DEPARTMENT LADDER
TRUCK EQUIVALENT VEHICLE PATH 300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
14'
PROPOSED
HYDRANT
EXP: EXP:
HYDRANT COVERAGE
(600-LF MAX)
HYDRANT COVERAGE CERTIFICATE OF AUTHORIZATION NUMBER:
(600-LF MAX) PROFESSIONAL ENGINEERING: 0021272
28' LAND SURVEYING: 0021271
397' GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
PROPOSED architect, professional engineer, or land surveyor, to alter an item in any
3-STORY way. If an item bearing the seal of an architect, engineer, or land surveyor
HYDRANT COVERAGE BUILDING is altered; the altering architect, engineer, or land surveyor shall affix to
(600-LF MAX) the item their seal and notation "altered by" followed by their signature and
± 25,000 SF FOOTPRINT date of such alteration, and a specific description of the alteration.
ACCESSIBLE
ROUTE (TYP.)
© 2024
2026 LaBella Associates
28'
28'
396'
S
RIM=600.15 533'
HOME LEASING
75 S CLINTON AVE SUITE 700,
ACCESSIBLE
WEST SENECA FIRE DEPARTMENT LADDER ROUTE (TYP.)
ROCHESTER, NEW YORK 14604
TRUCK EQUIVALENT VEHICLE PATH
WEST SENECA FIRE DEPARTMENT LADDER
TRUCK EQUIVALENT VEHICLE PATH
HYDRANT COVERAGE
(600-LF MAX)
PROPOSED
HYDRANT
ACCESSIBLE
ROUTE (TYP.)
DS
HYDRANT COVERAGE ACCESSIBLE
(600-LF MAX) ROUTE (TYP.)
276'
276' DS
WEST SENECA APARTMENTS
2544 CLINTON ST,
HYDRANT COVERAGE
(600-LF MAX)
WEST SENECA, NY 14224
15.7'
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C203 CODE COMPLIANCE.dwg
NO: DATE: DESCRIPTION:
WEST SENECA FIRE DEPARTMENT LADDER Revisions
TRUCK EQUIVALENT VEHICLE PATH
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
E-ONE HP95 Mid Mount
47.75
FIRE TRUCK AND SITE
EMERGENCY ACCESS PLAN
7.917 18.417 4.833
20.833
E-ONE HP95 Mid Mount
Overall Length 47.750ft
Overall Width 8.333ft
Overall Body Height 11.000ft
Min Body Ground Clearance 1.393ft
Track Width 8.333ft DRAWING NUMBER:
Lock-to-lock time 6.00s
Max Wheel Angle 45.00°
4/20/2026 1:17:33 PM
N
1 FIRE TRUCK AND SITE EMERGENCY ACCESS PLAN 0' 40' 80' 120'
C203 SCALE: 1" = 40'
C203
Page 383 of 1493
Page 384
NOT FOR CONSTRUCTION
75 LF 12" SICPP
ST
@ 1.00% MIN. 599
600
601
MATCH TO INSET
ST
300 Pearl Street, Suite 130
Buffalo, NY 14202
END SECTION
INV=583.66 716-551-6281
12 LF 12" SICPP @ 1.00%
599
ST
600 labellapc.com
600
599 60
1
C0
598
ST
UD UD UD UD UD UD UD UD UD UD UD UD D
598
600.14 599
600
NEW BIORETENTION 600
AREA #1 (± 350 SF) ST-4.0
599
600
ST
75 LF 12" SICPP 4' DIA. MH
ST-4.1
597
597
598
599
ST
598
RIM=600.25
599
@ 1.00% MIN. 599
600 24"x24" CB N INV=594.36
600
600
RIM=599.00 W INV=594.46
601 N INV=594.58 S INV=595.25
6" SICPP @
ST
1.00% MIN.
ST
EXP: EXP:
ST
N CERTIFICATE OF AUTHORIZATION NUMBER:
2 INSET 60
0 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
C301 SCALE: 1"=20' GEOLOGICAL: 0021659
ST
NEW PRIVATE
FIRE HYDRANT
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
FS
ST-3.4 Sec. 7307, for any person, unless acting under the direction of a licensed
ST
24"x24" CB architect, professional engineer, or land surveyor, to alter an item in any
ST
RIM=599.65 way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
S INV=597.58
the item their seal and notation "altered by" followed by their signature and
FS
date of such alteration, and a specific description of the alteration.
ST
ST
© 2024
2026 LaBella Associates
FS
600
ST
ST
NEW 6" FIRE SERVICE
600
600
(AFTER BACKFLOW
PREVENTOR)
HOME LEASING
598
FS
598
599
599
ST
75 S CLINTON AVE SUITE 700,
600
ST
ROCHESTER, NEW YORK 14604
150 LF 12"
SICPP @ 1.00%
FS
ST
600
ST
595
596
FS
597
ST
598
ST
FS
NEW BACKFLOW PREVENTOR (IN FS
ST
MECHANICAL ROOM) FOR COMBINED
ST
SERVICE. DOMESTIC SERVICE WILL BE
PROPOSED METERED AFTER THE BACKFLOW.
600
600
W
3-STORY C0
ST
BUILDING C0
W
± 25,000 SF FOOTPRINT ST-3.3
ST
24"x24" CB
RIM=599.75
FFE=600.75' 6" SICPP @ N INV=596.08 WEST SENECA APARTMENTS
599
ST
599
1.00% MIN. SW INV=596.08
2544 CLINTON ST,
W
WEST SENECA, NY 14224
595
596
597
598
NEW 6" PVC SDR-21 C0
ST ST ST ST ST ST ST ST ST ST
ST
ST
ST ST ST ST ST ST
SA
SANITARY LATERAL
600
599
600
W
SA
C0
ST
CONNECT INTO
600
600
EXISTING
SAN CO 600
ST
SANITARY MAIN SA
SA
SA TYP.
SA
C0
SA
W
60
SA
0
S SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA C0
SA SA
ST
4' DIA. SAN MH SA SA SA SA SA SA SA
SAN CO 600
RIM=600.15 NEW 6" PVC SDR-21 102 LF 12"
TYP. SAN CO
E INV=589.50 SICPP @ 1.00%
SA
SANITARY LATERAL
ST
TYP. NO: DATE: DESCRIPTION:
W INV=589.40 70 LF 6" SICPP
W
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
@ 1.00% MIN. Revisions
ST
SA
ST-3.0
PROJECT NUMBER:
ST
ST-2.0 4' DIA. MH
2241067
SA
W
4' DIA. MH RIM=599.33
RIM=599.29 N INV=593.25
599
599
ST
W INV=592.12 S INV=592.25 DRAWN BY:
600
E INV=591.25 EMM / SCB
SA
W INV=591.25
ST
30 LF 12" SICPP REVIEWED BY:
SRV / DPB
W
D D
50 5LF
99 12" SICPP @ 5.00%
SA
@ 5.00% 599
ISSUED FOR:
ST
ST-2.2 SITE PLAN APPROVAL
59
24"x24" CB
9
SA
ST-1.1
ST
ST
RIM=598.62
W
4' DIA. MH DATE:
E INV=596.12 599 ST 85 LF 12" SICPP 4/20/2026
RIM=599.08
E INV=591.25 @ 2.00%
SA
SAN CO
ST ST ST ST ST ST ST ST
TYP. W INV=591.25 35 LF 12" SICPP DRAWING NAME:
C0 D D
ST ST ST ST ST ST ST @ 3.00%
W
ST-3.2
SA
120 LF 8" SICPP ST-2.1 ST-3.1
END SECTION ST-1.0 24"x24" CB
@ 1.00% 24"x24" CB 24"x24" CB NEW 6" COMBINED
ADS STORMTECH CHAMBER RIM=598.50
INV=589.75 RIM=598.87 CONTECH CASCADE CS4 WQU RIM=598.89
599 SYSTEM SC-3500 WATER SERVICE
NE INV=595.00
SA
W INV=593.62 RIM=599.00 N INV=593.30
NE INV=593.62 E INV=591.15 (100 CHAMBERS) W INV=593.30 599 W INV=595.00
W
NEW 4" PVC SDR-21 W INV=591.15
NEW PRIVATE
INV=591.25
UTILITY PLAN
SA
SANITARY LATERAL FIRE HYDRANT
MATCH TO SHEET: C302
SA
W
FS
600
DRAWING NUMBER:
SA
W
C0
600
UTILITY PLAN NOTES:
4/20/2026 1:18:02 PM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PLAN 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C301
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C301 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 384 of 1493
Page 385
599
CONTECH CASCADE CS4 WQU RIM=598.89 WATER SERVICE
SYSTEM SC-3500 NE INV=595.00
SA
W INV=593.62 RIM=599.00 N INV=593.30 24
NOT FOR CONSTRUCTION
NE INV=593.62 E INV=591.15 (100 CHAMBERS) W INV=593.30 599 W INV=595.00
W
NEW 4" PVC SDR-21 W INV=591.15 INV=591.25
NEW PRIVATE
SA
SANITARY LATERAL FIRE HYDRANT
MATCH TO SHEET: C301
SA
W
300 Pearl Street, Suite 130
FS
600 Buffalo, NY 14202
716-551-6281
SA
W
C0
SAN CO NEW 6" FIRE SERVICE 600 labellapc.com
FS
TYP. (AFTER BACKFLOW
PREVENTOR)
598
599
598
W
599
DS
599
W
W
EXP: EXP:
W
CERTIFICATE OF AUTHORIZATION NUMBER:
DS PROFESSIONAL ENGINEERING: 0021272
NEW BACKFLOW PREVENTOR LAND SURVEYING: 0021271
(IN MECHANICAL ROOM) FOR GEOLOGICAL: 0021659
W
598
COMBINED SERVICE.
597
DOMESTIC SERVICE WILL BE
597
598
599
METERED AFTER THE It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
BACKFLOW. NEW BIORETENTION Sec. 7307, for any person, unless acting under the direction of a licensed
600
AREA #2 (± 370 SF) architect, professional engineer, or land surveyor, to alter an item in any
W
C0
ST-5.2 UD
way. If an item bearing the seal of an architect, engineer, or land surveyor
24"x24" CB is altered; the altering architect, engineer, or land surveyor shall affix to
599 UD
RIM=597.00 the item their seal and notation "altered by" followed by their signature and
598 UD
W INV=592.58 UD date of such alteration, and a specific description of the alteration.
597
UD
W
596 UD
UD
132 LF 12" UD UD © 2024
2026 LaBella Associates
UD UD UD
60 SICPP @ 0.50% UD
596
W
0
ST
NEW 6" COMBINED 597
W
ST 598
WATER SERVICE
STW
W W W W W W W W W W W W W
HOME LEASING
T
ST 600
W
75 S CLINTON AVE SUITE 700,
ST-5.0 ST
ROCHESTER, NEW YORK 14604
4' DIA. MH
ST
RIM=599.08
S INV=591.30 598
59
ST
9
W
E INV=591.92
W INV=591.20 ST
59 597
T
D
ST 9
ST
ST 596
ST 28 LF 12" SICPP 6
ST 59 7
ST
W
ST @ 1.00% 59 8
ST
ST ST-5.1 59
ST
ST 9
598
ST
ST 220 LF 12" 598 24"x24" CB 59
ST SICPP @ 0.50% 597 RIM=596.00
596 N INV=591.58
W
END SECTION 595
UD UD UD
UD UD UD
INV=589.00 C0
UD UD UD UD UD UD
T
UD
UD
UD
UD
UD
595
W
NEW BIORETENTION
NEW 6" COMBINED
AREA #3 (± 700 SF)
WATER SERVICE
9
59
W
ST-6.0 596
4' DIA. MH 597
WEST SENECA APARTMENTS
T
RIM=597.50 598
E INV=590.10 2544 CLINTON ST,
598
599
597
W
596
595
595
W INV=590.00
596
597
WEST SENECA, NY 14224
598
599
ST ST ST ST ST D ST ST ST ST ST ST ST ST ST ST
ST ST ST ST ST
175 LF 12" 175 LF 12"
W
END SECTION ST-6.1
T
SICPP @ 1.00% SICPP @ 1.00%
INV=5#.## 36"x36" CB
RIM=594.35
598
W INV=591.85
W
T
NO: DATE: DESCRIPTION:
CONNECT TO EXISTING 6"
W
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
WATERMAIN WITH TS&V Revisions
PROJECT NUMBER:
2241067
W
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
UTILITY PLAN
DRAWING NUMBER:
UTILITY PLAN NOTES:
4/20/2026 1:17:32 PM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PLAN 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C302
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C302 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 385 of 1493
Page 386
NOT FOR CONSTRUCTION
599
600
601
601.17
601.62
300 Pearl Street, Suite 130
Buffalo, NY 14202
594.92
716-551-6281
601.26
599
600 600.87
labellapc.com
600
599 60
1
C0
598
UD UD UD UD UD UD UD UD UD UD UD UD D
598
599
600
600 600.54 600.90
INSTALL AND MAINTAIN
599
600
TEMPORARY SILT SOCK
597
597
598
599
600.10
598
599
600.18
600
600
600.54 600.54 600.72
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
60
0 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
600.39 TC 600.84 TC
599.89 BC 600.34 BC It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2024
2026 LaBella Associates
600
600
600
HOME LEASING
598
598
599
599
75 S CLINTON AVE SUITE 700,
600
ROCHESTER, NEW YORK 14604
600
595 600.78 TC
596 600.28 BC 601.23 TC
597 600.73 BC
598
PROPOSED
600
600
3-STORY C0
BUILDING C0
± 25,000 SF FOOTPRINT
FFE=600.75' WEST SENECA APARTMENTS
599
599
600.92 TC
600.42 BC
2544 CLINTON ST,
600.91 TC
WEST SENECA, NY 14224
595
600.41 BC
596
597
598
600.14
C0
600
599
600
C0
600.38 TC 600.67 TC 600.68 TC 600.79 TC
600.11 600 600.50 TC
599.09 HP
600
599.88 BC 600.17 BC 600.18 BC 600.29 BC 600.00 BC
600 600.63 TC 600.63 TC
C0
600.27 600.13 BC 600.13 BC
60
600.63 TC
0
S
C0
600.13 BC
600
RIM=600.15
600.04 599.87
NO: DATE: DESCRIPTION:
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C400 GRADING PLAN.dwg
Revisions
599.92 TC 600.13 TC 599.91 TC 599.59 TC PROJECT NUMBER:
599.42 BC 599.63 BC 599.41 BC 599.09 BC 2241067
599
599
599.49 TC DRAWN BY:
600
598.99 BC EMM / SCB
REVIEWED BY:
599 D D SRV / DPB
599
ISSUED FOR:
SITE PLAN APPROVAL
59
9
DATE:
599 598.89 4/20/2026
DRAWING NAME:
599.34 TC C0 D D 599.72 TC 599.32 TC 599.05 TC
598.84 BC 599.22 BC 598.82 BC 598.55 BC
599.16
599.48 TC 599
598.98 BC
599.48 599.62
599 GRADING, EROSION, AND
SEDIMENT CONTROL PLAN
MATCH TO SHEET: C402 599.84
599.80
600.27 TC 600.37 TC 600.45 TC 600.44 TC 600.11 TC 600.02 TC 599.80 TC
599.98 TC 599.61 BC 599.52 BC 599.30 BC
599.48 BC 599.77 BC 599.87 BC 599.95 BC 599.94 BC
600
600.17 DRAWING NUMBER:
599.19 599.46
C0
600 599.87
4/20/2026 1:17:56 PM
N
1
GRADING, EROSION, AND SEDIMENT CONTROL PLAN 0' 20' 40' 60'
C401 SCALE: 1" = 20'
C401
Page 386 of 1493
Page 387
599.48 TC 599
598.98 BC 24
NOT FOR CONSTRUCTION
599
599.48 599.62
MATCH TO SHEET: C401
599.80 599.84
600.27 TC 600.37 TC 600.45 TC 600.44 TC 600.11 TC 600.02 TC 599.80 TC
599.98 TC 599.61 BC 599.52 BC 599.30 BC
599.77 BC 599.87 BC 599.95 BC 599.94 BC
599.48 BC 300 Pearl Street, Suite 130
FS
600 Buffalo, NY 14202
600.17 716-551-6281
599.19 599.46
C0
600.50 600.50 600.37 600 599.87 labellapc.com
600.20
FS
598.74
598
599
598
600.45
599
DS
599
599.24
598.95
600.45
598.50
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
DS PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
598
600.54
597
597
600.22
598
599
600.36 600.61 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
600.43 Sec. 7307, for any person, unless acting under the direction of a licensed
600
598.09
C0 598.54 architect, professional engineer, or land surveyor, to alter an item in any
INSTALL AND MAINTAIN way. If an item bearing the seal of an architect, engineer, or land surveyor
TEMPORARY SILT SOCK is altered; the altering architect, engineer, or land surveyor shall affix to
599 the item their seal and notation "altered by" followed by their signature and
598
date of such alteration, and a specific description of the alteration.
597
596
600.50 © 2024
2026 LaBella Associates
60 600.29 600.30 596
0 600.11 600.04
600.02
599.53 597
598
600.17 TC
599.67 BC 600
600.18
598.01 HOME LEASING
599.50 TC 75 S CLINTON AVE SUITE 700,
599.00 BC
599.94 TC 599.88 ROCHESTER, NEW YORK 14604
599.44 BC
INSTALL AND MAINTAIN
598
59
TEMPORARY CONCRETE 600.04 TC 598.46
9
600.03
WASHOUT 599.54 BC
599.54
D 59
9 597 599.84
599.04 596
599.99 6
598.32 59 7
599.17 59 8
59
9
598
598 59
597
596
595
C0 599.46 TC
598.96 BC
599.46
595
599.34 TC
598.84 BC
INSTALL AND MAINTAIN
TEMPORARY SILT SOCK 9
59
596
597
598
WEST SENECA APARTMENTS
2544 CLINTON ST,
598
599
597
596
595
595
596
597
WEST SENECA, NY 14224
598
599
599.70 TC
D 599.20 BC
INSTALL AND MAINTAIN TEMPORARY
CONSTRUCTION ENTRANCE
599.65
598
600.11 TC NO: DATE: DESCRIPTION:
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C400 GRADING PLAN.dwg
599.61 BC
Revisions
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
GRADING, EROSION, AND
SEDIMENT CONTROL PLAN
DRAWING NUMBER:
4/20/2026 1:17:35 PM
N
1
GRADING, EROSION, AND SEDIMENT CONTROL PLAN 0' 20' 40' 60'
C402 SCALE: 1" = 20'
C402
Page 387 of 1493
Page 388
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
STORM SEWER GRATE way. If an item bearing the seal of an architect, engineer, or land surveyor
12 is altered; the altering architect, engineer, or land surveyor shall affix to
"
OV MIN the item their seal and notation "altered by" followed by their signature and
ER IM 2" X 2" WOODEN SPIKES
LA UM date of such alteration, and a specific description of the alteration.
P PLACED 10' O.C.
BLOWN/PLACED FILTER MEDIA COMPOST FILTER SOCK
© 2024
2026 LaBella Associates
DISTURBED AREA UNDISTURBED AREA
MIN.
12"
2
1 SLOPE OR LESS
EXISTING CONTOURS
SECTION VIEW HOME LEASING
75 S CLINTON AVE SUITE 700,
FILTER SOCK FILLED ROCHESTER, NEW YORK 14604
8'
WITH CRUSHED STONE
DISTURBED AREA
FLO
W
FLO
W
SECURE FILTER SOCK
AS RECOMMENDED MIN. SLOPE MIN. SLOPE
STORM SEWER GRATE BY MANUFACTURER SILT FENCE
FLOW FLOW NOTES:
2" X 2" WOODEN STAKES
1. AREA CHOSEN FOR STOCKPILING OPERATIONS SHALL BE DRY AND STABLE.
PLACED 10' O.C.
2. MAXIMUM SLOPE OF STOCKPILE SHALL BE 1V:2H.
UNDISTURBED AREA
3. UPON COMPLETION OF SOIL STOCKPILING, EACH PILE SHALL BE SURROUNDED WITH
COMPOST FILTER SOCK
SILT FENCING, THEN STABILIZED WITH VEGETATION OR COVERED.
PLAN VIEW 4. SEE SPECIFICATIONS AND DETAIL FOR INSTALLATION OF SILT FENCE.
6 INLET PROTECTION IN PAVEMENT 5 COMPOST FILTER SOCK 4 TEMPORARY SOIL STOCKPILE
C501 N.T.S. C501 NYS DEC DETAIL: COMPOST FILTER SOCK C501 N.T.S.
WOVEN WIRE FENCE (MIN. 14 GAUGE W/
MAX. 6" MESH SPACING WITH FILTER CLOTH 36" MIN. FENCE
POSTS, DRIVEN MIN.
WEST SENECA APARTMENTS
10' MAX. C. TO C.
16" INTO GROUND 2544 CLINTON ST,
50' MIN. MOUNTABLE
WEST SENECA, NY 14224
BERM (OPTIONAL)
MIN.
6"
EXISTING
PAVEMENT
FILTER = 18"
3' 5:1
HEIGHT OF
MIN.
10' TYP. 2"
STAKE (TYP.)
EXISTING GROUND FILTER CLOTH
4"
MIN.
PROFILE VIEW
6"
1/8" DIA. STEEL WIRE
W
FLO
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
50' MIN. STAPLE DETAIL W
FLO
B B NO: DATE: DESCRIPTION:
10' MIN.
10' TYP.
PERSPECTIVE VIEW 1 41" SQUARE HARDWOOD Revisions
EXISTING GROUND
# STAPLES (2 PER BALE) BINDING WIRE 36" MIN. FENCE POST
C### PROJECT NUMBER:
12' MIN.
12' MIN.
EXISTING STRAW BALE (TYP.)
2241067
WOVEN WIRE FENCE (MIN. 14 GAUGE W/
3' TYP.
PAVEMENT MAX. 6" MESH SPACING WITH FILTER CLOTH
IMPERMEABLE SHEETING DRAWN BY:
20" MIN.
EMM / SCB
REVIEWED BY:
SYMBOL IMPERMEABLE SHEETING STRAW BALE (TYP.) WOOD OR METAL STAKES (2 PER BALE) UNDISTURBED SRV / DPB
FLOW GROUND
PLAN SECTION B-B ISSUED FOR:
PLAN VIEW NOTE: SITE PLAN APPROVAL
EMBED FILTER CLOTH A MIN. OF 6" IN GROUND
1. CAN BE TWO STACKED BALES OR PARTIALLY EXCAVATED TO REACH 3 FT DEPTH DATE:
CONSTRUCTION SPECIFICATIONS: 4" MIN. 4/20/2026
16" MIN.
1. STONE SIZE - USE 1-4 INCH STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.
CONSTRUCTION SPECIFICATIONS SYMBOL
DRAWING NAME:
2. LENGTH - NOT LESS THAN 50 FEET. COMPACTED SOIL
1. LOCATE WASHOUT STRUCTURE A MINIMUM OF 100 FEET AWAY FROM OPEN CHANNELS, STORM DRAIN INLETS, SENSITIVE AREAS, WETLANDS,
3. THICKNESS - NOT LESS THAN SIX (6) INCHES. BUFFERS AND WATER COURSES AND AWAY FROM CONSTRUCTION TRAFFIC.
4. WIDTH - TWENTY-FOUR (24) FOOT IF SINGLE ENTRANCE TO SITE. 2. SIZE WASHOUT STRUCTURE FOR VOLUME NECESSARY TO CONTAIN WASH WATER AND SOLIDS AND MAINTAIN AT LEAST 4 INCHES OF FREEBOARD.
5. GEOTEXTILE - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE.
6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ACCESS SHALL BE PIPED
TYPICAL DIMENSIONS ARE 10 FEET X 10 FEET X 3 FEET DEEP.
NOTES: SECTION VIEW
3. PREPARE SOIL BASE FREE OF ROCKS OR OTHER DEBRIS THAT MAY CAUSE TEARS OR HOLES IN THE LINER. FOR LINER, USE 10 MIL OR THICKER UV
BENEATH THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. RESISTANT, IMPERMEABLE SHEETING, FREE OF HOLES AND TEARS OR OTHER DEFECTS THAT COMPROMISE IMPERMEABILITY OF THE MATERIAL.
7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR
FLOWING OF SEDIMENT ONTO PUBLIC RIGHT OF WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED
4.
5.
PROVIDE A SIGN FOR THE WASHOUT IN CLOSE PROXIMITY TO THE FACILITY.
KEEP CONCRETE WASHOUT STRUCTURE WATER TIGHT. REPLACE IMPERMEABLE LINER IF DAMAGED (E.G., RIPPED OR PUNCTURED). EMPTY OR
1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. POSTS SHALL BE STEEL
EITHER "T" OR "U" TYPE OR HARDWOOD. CONSTRUCTION DETAILS
ONTO PUBLIC RIGHTS OF WAY MUST BE REMOVED IMMEDIATELY. REPLACE WASHOUT STRUCTURE THAT IS 75 PERCENT FULL, AND DISPOSE OF ACCUMULATED MATERIAL PROPERLY. DO NOT REUSE PLASTIC LINER. 2. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION.
8. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN WET-VACUUM STORED LIQUIDS THAT HAVE NOT EVAPORATED AND DISPOSE OF IN AN APPROVED MANNER. PRIOR TO FORECASTED RAINSTORMS, FENCE SHALL BE WOVEN WIRE, 6" MAXIMUM MESH OPENING.
APPROVED SEDIMENT TRAPPING DEVICE. REMOVE LIQUIDS OR COVER STRUCTURE TO PREVENT OVERFLOWS. REMOVE HARDENED SOLIDS, WHOLE OR BROKEN UP, FOR DISPOSAL OR 3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER-LAPPED BY SIX INCHES AND FOLDED.
9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN EVENT. RECYCLING. MAINTAIN RUNOFF DIVERSION AROUND EXCAVATED WASHOUT STRUCTURE UNTIL STRUCTURE IS REMOVED. FILTER CLOTH SHALL BE EITHER FILTER X, MIRAFI 100X, STABLINKA 140N, OR APPROVED EQUAL.
4. PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVED EQUAL.
5. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE.
3 STABILIZED CONSTRUCTION ENTRANCE 2 CONCRETE WASHOUT AREA WITH STRAW BALES 1 SILT FENCE DRAWING NUMBER:
C501 N.YS DEC DETAIL: STABILIZED CONSTRUCTION ACCESS C501 N.T.S. C501 NYS DEC DETAIL: SILT FENCE
4/20/2026 1:17:16 PM
C501
Page 388 of 1493
Page 389
NOT FOR CONSTRUCTION
SPACES SHOULD BE
EQUAL TO LINE WIDTH
NY R7-8 MUTCD R7-1 NY R7-8
300 Pearl Street, Suite 130
12"
1 MATCH ENDS OF TRANSITION
2" PREMOULDED Buffalo, NY 14202
CURB TO ADJACENT CURBS (OR
8"
BITUMINOUS CURB
UNLESS OTHERWISE
POST MOUNT SIGN OR
716-551-6281
NOTED ON PLANS
FLUSH WITH GRADE - SEE PLANS)
JOINT FILLER EXPANSION CAP
12
2" SIGN MOUNTED ON
"
8"
BOLLARD. SEE SITE
TOP OF CURB labellapc.com
7'-0"
TYP.
45°
PLAN (TYP.)
FLUSH CURB
4" WIDE
SEE PLANS
6"
PARKING
1'-4"
SPACE
PAVEMENT
12"
MARKING
1'-0"
1" 4'-0"
3'-0" MIN. NOTES:
#4 1'-6" LONG THIS PART OF DOWEL TO 6'-0" MAX.
4'-0"
BE PAINTED AND OILED 1. ALL STRIPING SHALL BE WHITE
ELEVATION AT EXPANSION JOINT TERMINAL/TRANSITION CURB 11 CROSSWALK
8' TYP. 8' TYP.
C502 N.T.S.
PAVEMENT SYMBOL PER ADA
WHITE ON BLUE BACKGROUND EXP: EXP:
NOTE: ALL PARKING STRIPING TO BE YELLOW 3
TOP OF CURB 8" CAP SCREW
#4 1'-6" LONG 3
8" FLAT WASHER
A
12 ADA PARKING SPACE STRIPING (ZINC PLATED)
CERTIFICATE OF AUTHORIZATION NUMBER:
SIGN FACE
C502 NEW SIGN PANEL (16 PROFESSIONAL ENGINEERING: 0021272
EXPANSION JOINT MATERIAL N.T.S. 2" x 2" SQ.
ROUNDED GA. GALV. STEEL) LAND SURVEYING: 0021271
AT CONCRETE SIDEWALKS
D
GEOLOGICAL: 0021659
D/2
R=1" 3
8" HEX NUT
CONCRETE SIDEWALK 8" (ZINC PLATED)
2"
A A
1
OR TOPSOIL
SECTION A-A
A CONSTRUCTION JOINT TOP OF PAVEMENT It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
TYP.
SEE PAVEMENT SECTION
6"
architect, professional engineer, or land surveyor, to alter an item in any
ELEVATION AT 2" x 2" SQUARE UNISTRUT POST way. If an item bearing the seal of an architect, engineer, or land surveyor
(GALV. STEEL) VARIABLE
1'-6"
CONSTRUCTION JOINT is altered; the altering architect, engineer, or land surveyor shall affix to
LENGTH (PERFORATED) the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SELECT DOMED CONCRETE FILL NEW SIGN PANEL (16 DOMED CONCRETE FILL
6" BACKFILL GA. GALV. STEEL)
7'-0" (MAX.)
5'-0" (MIN.)
MATERIAL CONTINUOUS BED © 2024
2026 LaBella Associates
6" O.D. STEEL PIPE WITH PLASTIC
SUBBASE COURSE 6" O.D. STEEL PIPE WITH PLASTIC
1'-9" (MIN.)
SLEEVE (YELLOW) A A SLEEVE (YELLOW)
MIN.
6"
DOWEL
3'-6"
D
3'-6"
DOMED IN GRASS AREA 2 14" x 2 1 4" SQUARE UNISTRUT
D/2
6" 6" FLUSH IN CONCRETE
OR PAVED AREA 2" x 2" SQUARE UNISTRUT POST POST BASE (GALVANIZED STEEL)
2"
3"
VERTICAL
(GALV. STEEL) VARIABLE
LENGTH (PERFORATED)
3
8" CAP SCREW
DOMED IN GRASS AREA
HOME LEASING
3
8" FLAT WASHER
75 S CLINTON AVE SUITE 700,
SECTION A-A
7'-0" (MAXIMUM)
5'-0" (MINIMUM)
(ZINC PLATED) ROCHESTER, NEW YORK 14604
SEE ASPHALT
TYPICAL SIGN FACE
PAVEMENT
TYPICAL
DETAILS
GRASS
PAVED AREA 2" x 2" SQ.
NOTES: AREA
4000 PSI CONCRETE 2 14" x 2 14" SQUARE UNISTRUT
3'-6"
3
8" HEX NUT (ZINC PLATED)
3'-6"
1. SLOPE TOP OF CURB 1/4" PER FOOT TOWARD PAVEMENT. POST BASE (GALVANIZED STEEL)
2. CONTRACTION JOINTS SHALL BE FORMED OR SAWCUT EVERY 10 FEET TO DEPTHS SLIGHTLY BELOW THE PAVEMENT SURFACE. UNDISTURBED EARTH SECTION A-A
4" TO 6"
3. EXPANSION JOINTS 1/2" IN WIDTH SHALL BE FORMED WITH A PREMOULDED BITUMINOUS JOINT FILLER EVERY 40 FEET. OR 18" SONOTUBE 5,000 PSI CONCRETE
3" x 3 8" BOLT (ZINC PLATED)
4. EXPANSIONS JOINTS AND FORMED CONTRACTION JOINTS ARE TO BE EDGED WITH CONCRETE FINISHING TOOLS. SUBBASE COURSE AND 3 8" 0 NUT (ZINC PLATED) UNDISTURBED EARTH
5. CONCRETE SEALING AGENT SHALL BE APPLIED THE SAME DAY THAT CURBS ARE CONSTRUCTED. NOTES:
6"
OR 18" SONOTUBE
4'-0"
6"
6. CONCRETE CURBING WITHIN R.O.W. SHALL CONFORM WITH NYSS M609-2R1.
7. CURB THICKNESS T IS TO BE 5" OR AS INDICATED ON THE DRAWINGS. 1. MAINTAIN TWO FEET OF CLEARANCE FROM SUBBASE COURSE
8" MIN.
8" MIN.
8. PROVIDE 0" CURB REVEAL FOR HEADER CURB CURB AT SIDEWALK RAMPS AND 1" CURB REVEAL FOR HEADER CURB AT DRIVEWAYS. FACE OF CURB TO ANY PART OF SIGN, AS
9. ALL CURB, EXCEPT HEADER CURB USED FOR SIDEWALK ACCESS RAMPS, IS TO HAVE THE 1" RADIUS. NOTE: APPLICABLE.
10. GRADED STONE BACKING IS TO BE PLACED WHEN SIDEWALK DOES NOT ABUT CURB. 2. SEE PLANS FOR SIGN AND POST LOCATIONS. NOTES:
1. FINAL LOCATION OF BOLLARDS SHALL BE APPROVED
11. USE 5000 PSI CONCRETE FOR CONVENTIONALLY FORMED CURB. AND 5000 PSI CONCRETE FOR MACHINE FORMED CURB. BY THE OWNER OR ARCHITECT/ENGINEER.
1. FINAL LOCATION OF BOLLARDS SHALL BE APPROVED BY THE OWNER OR ARCHITECT/ENGINEER.
10 CONCRETE CURB 9 BOLLARD 8 POST MOUNT SIGN 7 BOLLARD MOUNTED SIGN
C502 N.T.S. C502 N.T.S. C502 N.T.S. C502 N.T.S.
INITIAL FULL DEPTH SAW CUT
FINAL SAW CUT. MATCH EXISTING SEE NOTE 2
PAVEMENT. CAP SEAM WITH
BITUMINOUS SEALER. (SEE NOTE 2)
TOP COURSE
BINDER COURSE
WEST SENECA APARTMENTS
SEE NOTE 2 18" SUBBASE COURSE 2544 CLINTON ST,
WEST SENECA, NY 14224
EXISTING
ASPHALT PAVEMENT NOTES: PAVEMENT
1. HMA ITEMS ARE BASED ON PG 64-22 BINDER, ESALs LESS THAN 30,000,000. TACK COAT IS REQUIRED BETWEEN ALL LIFTS OF ASPHALT. USE OF POLYPHOSPHORIC ACID (PPA) TO MODIFY THE BINDER
6"x6" WELDED WIRE EXISTING
PROPERTIES IS PROHIBITED. THIS PROHIBITION ALSO APPLIES TO THE USE OF PPA AS A CROSS-LINKING AGENT FOR POLYMER MODIFICATION.
TOP AND BOTTOM SUBBASE
8" THICK
2. BUTT JOINTS, CREATED BY A FULL-DEPTH SAWCUT, SHALL BE USED BETWEEN NEW AND EXISTING PAVEMENTS. THE ASPHALT TOP COURSE SHALL BE LAID SUCH THAT IT UNIFORMLY OVERLAPS THE 4,500 PSI CONCRETE
ADJACENT COLD MAT BY 2"-3". THE THICKNESS OF THE OVERLAP MATERIAL SHALL BE 1/4 THE COMPACTED THICKNESS OF THE COURSE, SO AS TO RESULT IN A SMOOTH AND WELL-COMPACTED JOINT
AFTER ROLLING. BROADCASTING OF THE OVERLAP MATERIAL ONTO THE LANE IS NOT ALLOWED. IF THE OVERLAP IS EXCESSIVE, THE EXCESS MATERIAL SHALL BE TRIMMED OFF SO THAT THE MATERIAL x x x x x x x
ALONG THE JOINT IS UNIFORM. THE COARSE PARTICLES OF AGGREGATE IN THE OVERLAP MATERIAL SHALL BE REMOVED AND WASTED IF DEEMED NECESSARY BY THE INSPECTOR.
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
x x x x x x GEOTEXTILE STABILIZATION
3. DESIGN PGB CONTENT SELECTION: THE PRODUCER SELECTS THE DESIGN PGB CONTENT THAT RESULTS IN A COMPACTED DENSITY OF 96.5% Gmm AT THE DESIGN NUMBER OF GYRATIONS (Ndesign). 12" COMPACTED FABRIC (SEE ASPHALT
1 21" 9.5 F2 TOP COURSE HMA UNDER NO CIRCUMSTANCES SHALL THE PERFORMANCE GRADED BINDER CONTENT IN THE HMA MIXTURE BE LESS THAN 5.8% FOR A 9.5 DESIGN, 5.2% FOR A 12.5 DESIGN, 4.5% FOR A 19.0 DESIGN, 4.2% SUBBASE MATERIAL NO: DATE: DESCRIPTION:
PAVEMENT DETAILS)
80 SERIES COMPACTION FOR A 25.0 DESIGN, OR 3.7% FOR A 37.5 DESIGN. ALL VOLUMETRIC AND MECHANICAL PROPERTIES ARE CHECKED AT THIS PGB CONTENT TO ENSURE THAT ALL REQUIREMENTS ARE MET. NOTES: Revisions
NYSDOT ITEM NO. 402.098202 WELL COMPACTED SUBGRADE
2-1/2" 19.0 F9 BINDER COURSE HMA 4. PERFORM ALL WARRANTY WORK IN ACCORDANCE WITH MATERIALS PROCEDURE (MP) 402-01, WARRANTY REQUIREMENTS FOR HOT MIX ASPHALT (HMA) TOP COURSE. 1. VERTICALLY SAW CUT ALL ASPHALT FULL DEPTH.
80 SERIES COMPACTION 2. BLOW CLEAN AND APPLY TACK COAT 0.050 GAL/SY AT ALL ASPHALT TO ASPHALT SURFACES. PROJECT NUMBER:
COMPACTED
NYSDOT ITEM NO. 402.198902 5. AS PER STANDARD SPECIFICATION SECTION 401-4.01 CERTIFIED PRODUCTION, PRODUCTION LESS THAN 500 TONS, AND HIGHWAY PERMIT PRODUCTION, PRODUCTION MEETING THE SPECIFICATION 3. REFER TO STANDARD DUTY PAVEMENT SECTION DETAIL FOR COURSE THICKNESS. 2241067
SUBGRADE
REQUIREMENTS WILL BE ASSIGNED A QAF OF 1.00. PRODUCTION FAILING TO MEET THE SPECIFICATION REQUIREMENTS WILL BE SUBJECT TO EVALUATION ACCORDING TO SECTION 401-4.03, EVALUATION
6" 37.5 F9 BASE COURSE HMA OF SUBLOTS REPRESENTED BY 0.85 QAF.
6 CONCRETE PAD 5 STANDARD DUTY PAVEMENT JOINT DRAWN BY:
80 SERIES COMPACTION EMM / SCB
NYSDOT ITEM NO. 402.378902 1 1/2" ASPHALT CONCRETE TOP COURSE C502 N.T.S. C502 N.T.S. REVIEWED BY:
2 1/2" ASPHALT CONCRETE BINDER COURSE SRV / DPB
12" SUBBASE COURSE, TYPE 2 12" STONE SUBBASE COURSE
(INSTALLED IN TWO 6" LIFTS) BEVEL EDGE ISSUED FOR:
NYSDOT ITEM NO. 304.12 ASPHALT EMULSION TACK 6" SITE PLAN APPROVAL
COAT NYSDOT ITEM
407.01 - TACK COAT FINISH GRADE DATE:
4/20/2026
MATCH ORIGINAL RESTORE LAWN DISTURBED BY CONSTRUCTION MATCH ENDS OF TRANSITION
CURB
SHOULDER SLOPE AND PROVIDE NEW 6" MINIMUM DEPTH CURB TO ADJACENT CURBS (OR DRAWING NAME:
MECHANICALLY SCREENED TOPSOIL CURB CURB TERMINAL FLUSH WITH GRADE - SEE PLANS)
EXTEND BASE COURSE AT FREE EDGE
FLUSH CURB
6"
1'-6" 6"
COMPACTED SUBGRADE
1'-6"
FINISHED GRADE FINISHED GRADE
GEOTEXTILE STABILIZATION FABRIC,
TENSAR T-130 OR APPROVED EQUAL CONSTRUCTION DETAILS
1'-0"
NOTES: RESTORE LAWN DISTURBED BY
6'-0" UNLESS
6'-0" CONSTRUCTION AND PROVIDE NEW
COMPACTED 1. PROVIDE ADDITIONAL SUBBASE MATERIAL WHERE FILL IS REQUIRED TO OBTAIN PROPER 6" MINIMUM DEPTH MECHANICALLY OTHERWISE NOTED
SUBGRADE SUBGRADE ELEVATION, OR TO REPLACE UNSUITABLE SUBGRADE MATERIAL. SCREENED TOPSOIL
4 PAVEMENT SECTION WITHIN R.O.W. 3 ASPHALT PAVEMENT SECTION 2 CURB TERMINAL 1 CURB TRANSITION
DRAWING NUMBER:
C502 N.T.S. C502 N.T.S. C502 N.T.S. C502 N.T.S.
4/20/2026 1:17:48 PM
C502
Page 389 of 1493
Page 390
NOT FOR CONSTRUCTION
SIDEWALK SIDEWALK GR B
AS
S
4'-0
GR SE " MIN
AD
E BR
EP
LA
300 Pearl Street, Suite 130
A EA N
KB
AC
Buffalo, NY 14202
KO A
FC A 716-551-6281
UR
B >5 7.5% MAX SLOPE 4'-0" MIN.
'
3'-0" SEE PLAN 3'-0"
labellapc.com
SEE CONCRETE SIDEWALK DETAIL
SEE CONCRETE SIDEWALK DETAIL
B
DETECTABLE
0" TOP OF PAVEMENT
WARNING SYSTEM 2'- GR
AS
S SECTION A-A
MEET FLUSH WITH
A TOP OF PAVEMENT 25% MAX SLOPE
MEET FLUSH WITH MEET FLUSH WITH TOP OF PAVEMENT 3'-0
TOP OF PAVEMENT "
DETECTABLE WARNING SYSTEM A
0" CURB REVEAL VARIES
DETECTABLE WARNING SYSTEM
ACCESS RAMP AT CORNER - ISOMETRIC OPTION 1 ACCESS RAMP - ISOMETRIC OPTION 3 A PAVEMENT
7.5%
CURB
TOP OF CURB 7.5% MAX SLOPE
SIDEWALK TYPE "B" RAMP ISOMETRIC
SIDEWALK
SECTION B-B EXP: EXP:
GR
NOTES:
AD TOP OF PAVEMENT
E BR TRANSITION FLUSH WITH PAVEMENT CERTIFICATE OF AUTHORIZATION NUMBER:
A EA 1. 7.5% IS MAXIMUM SLOPE OF ACCESS RAMP.
KB PROFESSIONAL ENGINEERING: 0021272
AC 2. SURFACE OF ACCESS RAMP IS TO BE STABLE, FIRM AND SLIP-RESISTANT. TEXTURE SURFACE WITH
KO A LAND SURVEYING: 0021271
FC
UR SECTION A-A COARSE BROOM RUNNING TRANSVERSE TO SLOPE OF ACCESS RAMP.
GEOLOGICAL: 0021659
B< 3. ENTIRE AREA OF ACCESS RAMP AND LANDING PAD IS TO BE 7 INCH THICK CONCRETE.
5'
SEE CONCRETE SIDEWALK DETAIL
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
SEE CONCRETE SIDEWALK DETAIL
7 SIDEWALK RAMP TYPE B Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
C503 N.T.S. way. If an item bearing the seal of an architect, engineer, or land surveyor
MEET FLUSH WITH is altered; the altering architect, engineer, or land surveyor shall affix to
A TOP OF PAVEMENT MEET FLUSH WITH the item their seal and notation "altered by" followed by their signature and
TOP OF PAVEMENT date of such alteration, and a specific description of the alteration.
DETECTABLE WARNING SYSTEM A
B
DETECTABLE WARNING SYSTEM
ACCESS RAMP AT CORNER - ISOMETRIC OPTION 2 ACCESS RAMP - ISOMETRIC OPTION 4 © 2024
2026 LaBella Associates
8 SIDEWALK RAMP TYPE D 3'-0"
MINIM
A UM TOP OF PAVEMENT TOP OF CURB
C503 N.T.S. WIDTH VARIES, SEE PLANS SIDEW 12 12
ALK 1 1
B
8"
DETECTABLE WARNING 6'-0"
3'-0" MIN.
SEE PLAN 6'-0"
HOME LEASING
4,500 PSI CONCRETE TOOLED NOTCH 38" x 83" VERTICAL CURB 75 S CLINTON AVE SUITE 700,
SYSTEM PER DETAIL 2'-0"
" MEET FLUSH WITH SECTION A-A ROCHESTER, NEW YORK 14604
R1
SLOPE AS SHOWN ON PLANS 6" UNLESS OTHERWISE SHOWN ON PLANS TOP OF PAVEMENT
A
TOP OF SIDEWALK RAMP TYPE A ISOMETRIC
5"
SLOPE PAVEMENT GRASS
VARIES
TOP OF CURB SIDEWALK
12 12
6"
SEE PAVEMENT 1 1 3'-0
"M
10"
SECTIONS 12 IN.
(SE
6'-0" HEADER EP
1 LA
N)
SUBBASE MATERIAL TRANSITION CURB TRANISITON
A
TOP OF PAVEMENT
6"
0"
2'-
1 12
2" 2" 8" VIEW A-A MEET FLUSH WITH
NOTES: 1:50
TOP OF PAVEMENT
8" 0" CURB REVEAL DETECTABLE WARNING SYSTEM
12
1. 1:12 IS MAXIMUM SLOPE OF ACCESS RAMP AND MAX
1 SIDEWALK
SIDE FLARE IN PAVED AREA.
6 CONCRETE SIDEWALK AND INTEGRAL VERTICAL CURB SECTION 2. SURFACE OF ACCESS RAMP IS TO BE STABLE,
A
FIRM AND SLIP-RESISTANT. TEXTURE SURFACE
C503 N.T.S. ACCESS LANDING PAD
WITH COARSE BROOM RUNNING TRANSVERSE
RAMP 3'-0" MINIMUM
TO SLOPE OF ACCESS RAMP.
3. ENTIRE AREA OF ACCESS RAMP AND LANDING
ACCESS RAMP - TYPE C ISOMETRIC
PAD IS TO BE 7 INCH THICK CONCRETE.
NOTES:
SECTION B-B
1. 1:12 IS MAXIMUM SLOPE OF ACCESS RAMP. WEST SENECA APARTMENTS
5 SIDEWALK RAMP TYPE A 2. SURFACE OF ACCESS RAMP IS TO BE STABLE, FIRM AND SLIP-RESISTANT. TEXTURE SURFACE
WITH COARSE BROOM RUNNING TRANSVERSE TO SLOPE OF ACCESS RAMP.
2544 CLINTON ST,
4" WIDE 3. ENTIRE AREA OF ACCESS RAMP AND LANDING PAD IS TO BE 7 INCH THICK CONCRETE. WEST SENECA, NY 14224
C503 N.T.S.
PARKING
SPACE
50%-60% OF 4 SIDEWALK RAMP TYPE C
PAVEMENT
MARKING BASE DIAMETER C503 N.T.S.
4'-0"
2'-0"
4'-0"
0.20"
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
5)
TE
E NO
0.90"-1.41" S (SE NO: DATE: DESCRIPTION:
1 1 SAW-CUT, OR WET CUT CONCRETE
ELECTRIC CHARGING STATION RIE 2" WIDE PREMOULDED BITUMINOUS 2" WIDE PREMOULDED BITUMINOUS
PAVEMENT SYMBOL VA JOINT FILLER WITH 5 8" DEEP X 12" WIDE JOINT FILLER WITH 5 8" DEEP X 12" WIDE WITH TROWEL OR JOINT TOOL, Revisions
1
SELF LEVELING CAULKING SEALANT SELF LEVELING CAULKING SEALANT 3 SLAB THICKNESS, FULL WIDTH.
DOME SECTION FINISHED GRADE FINISHED GRADE FINISHED GRADE
PROJECT NUMBER:
NO ISOMETRIC
2241067
ELECTRIC PARKING 1.625"- 2.41"
C TO C FILL JOINTS WITH UNILOCK POLYMERIC DRAWN BY:
EMM / SCB
VEHICLE
PARKING
ANY JOINT SAND OR APPROVED EQUIVALENT 1" THICK COMPACTED SETTING BED
OF WASHED COARSE AGGREGATE REVIEWED BY:
SRV / DPB
TIME TYPICAL WARNING UNIT
1.625"-2.41"
ONLY WHILE THIS PART OF DOWEL TO EXPANSION JOINT CONTROL JOINT
C TO C
CHARGING SIDEWALK ACCESS RAMP BE PAINTED AND OILED ISSUED FOR:
1" TO 4"
12" X 18" #4 - 16" LONG SMOOTH DOWEL AT 18" ON-CENTER
SITE PLAN APPROVAL
12" X 18" 2" DIAMETER WEEP HOLE AT LOW POINT
ELECTRIC VEHICLE EDGE OF RAMP CONCRETE DRILL AND EPOXY GROUT INTO EXISTING CONCRETE
ACCESSIBLE SYMBOL CHARGING STATION
NO PARKING FILL WITH SETTING BED MATERIAL SIDEWALK (CENTERED) AND EXISTING BUILDING DATE:
COLOR WHITE ON BLUE BACKGROUND MUTCD R7-1 FOUNDATION AT DOORWAYS. COAT DOWEL IN NEW 4/20/2026
SIDEWALK NOTES:
0.625"
FEDERAL DESIGNATION
7"
SURFACE WITH BOND BREAKER
CURB FLUSH WITH PAVEMENT DRAWING NAME:
1"-4"
1. CONCRETE SHALL BE 4,500 PSI AIR ENTRAINED MIX AT 28 DAYS
2. COMPACTED SUBBASE MATERIAL SHALL COMPLY WITH NYSDOT ITEM 304.14,
RESERVED 1" 0.625"
RESHAPE CURB BACKING
AT WEEP HOLE LOCATION
CONTRACTOR TO RESTORE LAWN DISTURBED BY
CONSTRUCTION AND PROVIDE NEW 6" MECHANICALLY TYPE 4
PARKING 12" X 18" BACK EDGE OF CURB
SCREENED TOPSOIL AND ESTABLISH TURF. 3. CONCRETE SURFACE SHALL RECEIVE A BROOM FINISH AND TWO COATS OF A
MEMBRANE FORMING SEALER AT RATES SPECIFIED BY THE PRODUCT
6" SUBBASE COURSE 5" 4,500 PSI CONCRETE
RESERVED MANUFACTURE.
NY R7-8
FEDERAL DESIGNATION
DOME SPACING SECTION 3"
6" COMPACTED SUBBASE MATERIAL 4. EXPANSION JOINTS SHALL BE PROVIDED AT ALL FITTED STRUCTURES AND AT
EVERY 25' ON CENTER.
CONSTRUCTION DETAILS
NOTES: 5. CONTROL JOINTS SHALL BE EVERY 5' OR AS SHOWN ON THE PLANS AND IN
12" X 6" ACCORDANCE WITH ACI 330-R92. THESE JOINTS SHALL BE COMPLETED
1. QUANTITY OF TRUNCATED DOMES SHOWN IS FOR ILLUSTRATIVE PURPOSES ONLY AND TO DEPICT REQUIRED SQUARE GRID PATTERN.
VAN VAN ACCESSIBLE
2. TRUNCATED DOMES ARE TO BE ALIGNED ON THE SQUARE GRID PATTERN IN THE PREDOMINANT DIRECTION OF TRAVEL.
WITHIN 24 HOURS OF CONCRETE PLACEMENT. SCORED JOINTS SHALL BE
ELECTRIC CHARGING SYMBOL ACCESSIBLE MUTCD R7-8a
3. ENTIRE DETECTABLE WARNING SYSTEM FIELD, INCLUDING TRUNCATED DOMES, IS TO BE DARK GRAY IN COLOR, N7 PER MUNSELL BOOK NOTATION, OR APPROVED EQUIVALENT.
1 1
4-INCH WIDTH MINIMUM AND 3 OF THE THICKNESS OF THE CONCRETE
4'x4', COLOR WHITE ON GREEN FEDERAL DESIGNATION 6. SIDEWALK ADJACENT TO THE CURB SHALL HAVE A 2.00% CROSS-SLOPE TO
4. OUTER EDGE OF THE DETECTABLE WARNING SYSTEM FIELD IS TO BE LOCATED SO THAT THE EDGE OF THE WARNING FIELD NEAREST TO THE STREET IS 1 TO 4 INCHES BEHIND THE BACK
BACKGROUND THE CURB. OTHER AREA AS INDICATED ON THE GRADING PLAN.
EDGE OF THE CURB SECTION.
7. ALL JOINTS AND EXPOSED EDGES SHALL BE ROUNDED WITH JOINT TOOL. DRAWING NUMBER:
5. DETECTABLE WARNING SYSTEM IS TO EXTEND ACROSS THE FULL WIDTH OF A SIDEWALK ACCESS RAMP, BUT NOT UP THE SIDE FLARES. COMPACTED SUBGRADE
PAVEMENT MARKINGS AND SIGNAGE BRICK DETECTABLE WARNING SYSTEM AT CURB CONCRETE SIDEWALK
4/20/2026 1:17:24 PM
3 2 1
C503 N.T.S. C503 N.T.S. C503 N.T.S.
C503
Page 390 of 1493
Page 391
NOT FOR CONSTRUCTION
COVER PIPE CONNECTION TO END INSTALL FLAMP ON 24" (600 mm) ACCESS PIPE OPTIONAL INSPECTION PORT
CAP WITH ADS GEOSYNTHETICS 601T PART #: MCFLAMP
NON-WOVEN GEOTEXTILE
MC-3500 CHAMBER
MC-3500 END CAP
6" MAX
PONDING 4.0H
MAX. PONDING/
HEIGHT 1V
RIM OF CB OVERFLOW ELEV. STORMTECH HIGHLY RECOMMENDS
FLEXSTORM INSERTS IN ANY UPSTREAM 300 Pearl Street, Suite 130
STRUCTURES WITH OPEN GRATES
6" MIN. ORGANIC Buffalo, NY 14202
FILTER MEDIA 716-551-6281
NOTES: ELEVATED BYPASS MANIFOLD
1. CONTRACTOR SHALL INSTALL FILTER MEDIA AFTER SITE HAS BEEN STABILIZED TO labellapc.com
MINIMIZE POTENTIAL OF SEDIMENT CONTAMINATION OF MEDIA.
2. FILTER MEDIA SHALL BE LOAM/SAND MIX, NYSDOT BIO SOIL MIX ITEM #208.01030022,
CONTAINING A MINIMUM OF 85% TO 88% COARSE/MEDIUM SAND BY VOLUME, 8% TO 12%
24" MIN.
SOIL FINES, AND 3% TO 5% ORGANIC MATTER.
FILTER MEDIA 3. ORGANIC FILTER MEDIA SHALL MEET SAME CRITERIA AS ABOVE WITH THE EXCEPTION OF
CONTAINING 10% TO 12% ORGANIC MATTER.
4. SOIL SHOULD FALL WITHIN USCS TYPES SM OR ML WITH PERMEABILITY OF AT LEAST 1.0
FEET PER DAY. SOIL SHOULD BE FREE FROM STONES, STUMPS, ROOTS OR OTHER WOODY SUMP DEPTH TBD BY CATCH BASIN
MATERIAL OVER 1" IN DIAMETER. SITE DESIGN ENGINEER OR MANHOLE
(24" [600 mm] MIN RECOMMENDED)
5. PLACEMENT OF THE PLANTING SOIL SHOULD BE IN LIFTS OF 12" TO 18", LOOSELY
24" (600 mm) HDPE ACCESS PIPE REQUIRED ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN
6"-12" DRAINAGE COMPACTED TO AT MOST 80% PROCTOR TEST. PH RANGE: 5.2 - 7.00. USE FACTORY PARTIAL CUT END CAP PART #: FOUNDATION STONE AND CHAMBERS
GRAVEL JACKET 6. FILTER FABRIC TO BE NON-WOVEN CLASS 'C', MIRAFI 180-N OR APPROVED EQUIVALENT MC3500IEPP24BC OR MC3500IEPP24BW 8.25' (2.51 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
7. DRAINAGE GRAVEL TO MEET AASHTO M-43. NO.67, SIZE 0.25" TO 0.75"
8. CONTRACTOR TO PROVIDE PLANTING SOIL SUBMITTAL SPECIFICATION FOR REVIEW AND
FILTER FABRIC
APPROVAL PRIOR TO CONSTRUCTION.
9. WETLAND SEED MIX SHALL BE USED AS INDICATED IN SPECIFICATIONS. 7 MC-3500 ISOLATOR ROW PLUS DETAIL EXP: EXP:
4" PERFORATED PVC @ 0.2% SUBGRADE OR
10. CONTRACTOR SHALL PROVIDE AT LEAST TWO PERMEABILITY TESTS FOR EACH FACILITY C504 N.T.S.
EXISTING SOIL DRAINAGE GRAVEL
LOCATED AT OPPOSITE SIDES OF FACILITY.
8 BIORETENTION INSERTA TEE DETAIL UNDERDRAIN DETAIL CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
NTS NTS
C504 N.T.S. DO NOT INSTALL STORMTECH STORMTECH LAND SURVEYING: 0021271
INSERTA-TEE AT CHAMBERS STORMTECH CHAMBER GEOLOGICAL: 0021659
CHAMBER JOINTS END CAP
PROVIDE CAST IRON FRAME PROVIDE CAST IRON CLEANOUT THREADED PLUG IP THD OR BRASS A OUTLET MANIFOLD
AND COVER, SET FLUSH SCREW PLUG (HS 67). PVC PLUGS NOT ALLOWED. PROVIDE 1"-3" It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
WITH FINISH GRADE 10" CLEARANCE BETWEEN PLUG & UNDERSIDE OF COVER CONVEYANCE PIPE Sec. 7307, for any person, unless acting under the direction of a licensed
MATERIAL MAY VARY architect, professional engineer, or land surveyor, to alter an item in any
GRADE (PVC, HDPE, ETC.)
FOUNDATION STONE way. If an item bearing the seal of an architect, engineer, or land surveyor
FINISH GRADE FOR UNPAVED AREAS BENEATH CHAMBERS is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
7 1/2"
WITHOUT FRAME AND COVER
1"
date of such alteration, and a specific description of the alteration.
A
ADS GEOSYNTHETICS 601T
17" INSERTA TEE SECTION A-A
CONNECTION
INSERTA TEE TO BE NON-WOVEN GEOTEXTILE DUAL WALL © 2024
2026 LaBella Associates
COMPACTED FILL TAMPED IN 6" INSTALLED, CENTERED PERFORATED
(X)
LAYERS OVER CORRUGATION HDPE
STORMTECH UNDERDRAIN
STORM SECTION A-A SIDE VIEW END CAP
DWV PVC FEMALE ADAPTER, IP PLACE ADSPLUS WOVEN GEOTEXTILE
THREAD x SOCKET (CENTERED ON INSERTA-TEE INLET) OVER
C.O.
BEDDING STONE FOR SCOUR PROTECTION AT
6" RISER: SDR-35 PVC (ASTM D-2241)
WITH SOLVENT WELDED JOINTS LETTERING ON COVER
SIDE INLET CONNECTIONS. GEOTEXTILE MUST
EXTEND 6" (150 mm) PAST CHAMBER FOOT CHAMBER
MAX DIAMETER OF
INSERTA TEE
HEIGHT FROM BASE
OF CHAMBER (X)
B B
HOME LEASING
FOUNDATION STONE
PROVIDE SDR-35 GASKETED NOTES: SC-310 6" (150 mm) 4" (100 mm)
A BENEATH CHAMBERS
75 S CLINTON AVE SUITE 700,
FITTINGS AS NECESSARY; 1/8TH SC-800 10" (250 mm) 4" (100 mm) ROCHESTER, NEW YORK 14604
6" x 6" x 6" SDR-35 TRUE 45 DEGREE BEND, OR TWO 1/16TH BENDS 1. FRAME AND COVER TO BE USED DC-780 10" (250 mm) 4" (100 mm)
NOTES:
ONLY IN PAVED AREAS. ADS GEOSYNTHETICS 601T
WYE WITH BENDS AS NECESSARY COMPACTED CRUSHED STONE FILL · PART NUMBERS WILL VARY BASED ON INLET PIPE MC-3500 12" (300 mm) 6" (150 mm)
A NON-WOVEN GEOTEXTILE
MATERIALS. CONTACT STORMTECH FOR MORE
6" MIN. 6" MIN. DEPTH = 1/2 OD + 12" MIN. 2. CRUSHED STONE: NO. 1 WASHED MC-4500 12" (300 mm) 8" (200 mm)
INFORMATION.
STONE OR A MIX OF NO. 1 AND · CONTACT ADS ENGINEERING SERVICES IF INSERTA TEE MC-7200 12" (300 mm) 8" (200 mm) NUMBER AND SIZE OF UNDERDRAINS PER SITE DESIGN ENGINEER
4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS SECTION B-B
NO. 2 WASHED STONE INLET MUST BE RAISED AS NOT ALL INVERTS ARE INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS
POSSIBLE. 6" (150 mm) TYP FOR SC-800, DC-780, MC-3500, MC-4500 & MC-7200 SYSTEMS
RECOMMENDED METHODS FOR JOINING OF GASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRON
SOLVENT WELD PIPE:
SELECT SELECT
GRANULAR
FILL
GRANULAR
FILL
1. CLEAN DRY HUBS & SPIGOTS
5 MC-3500 INSERTA-TEE INLET 4 MC-3500 UNDERDRAIN
2. APPLY PRIMER TO PARTS BEING C504 N.T.S. C504 N.T.S.
CONNECTED
3. APPLY PVC SOLVENT WELD CEMENT
FLOW DIRECTLY OVER PRIMER
** PVC TYPE IS COMPATIBLE FOR SOLVENT
WELDING TO SDR-35 OR ANY OTHER PVC TYPE I ACCEPTABLE FILL MATERIALS: STORMTECH MC-3500 CHAMBER SYSTEMS
PIPE MADE TO STEEL PIPE OUTSIDE DIMENSIONS
MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT
FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE
6" SDR-35 PVC (ASTM D2241) UNDISTURBED EARTH CRUSHED STONE BEDDING 6" SDR-35 PVC (ASTM D2241) PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED
TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S
SERVICE LATERAL WITH PUSH ON D N/A INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND
SERVICE LATERAL WITH PUSH ON DEPTH=1/2 OD +6" PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.
PREPARATION REQUIREMENTS.
NEOPRENE RUBBER GASKETS NEOPRENE RUBBER GASKETS PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER
6 CLEANOUT FOR NEW STORM LATERAL INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE
GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35%
AASHTO M145¹
A-1, A-2-4, A-3 BEGIN COMPACTIONS AFTER 18" (450 mm) OF MATERIAL OVER
FINES OR PROCESSED AGGREGATE. THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS
C504 N.T.S. C
TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 18" (450 mm)
ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT
MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF
OR IN 12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY
FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY
WEST SENECA APARTMENTS
SUBBASE MAY BE A PART OF THE 'C' LAYER. AASHTO M43¹
THIS LAYER.
3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10
FOR PROCESSED AGGREGATE MATERIALS. 2544 CLINTON ST,
FRAME & GRATE: EJ CASTINGS WEST SENECA, NY 14224
NO. 4 BARS, 4 EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS
RETICULINE GRATE, H-20 LOAD RATED, CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5
AASHTO M43¹
GRASS CONCRETE B FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER NO COMPACTION REQUIRED
BICYCLE PROOF, ADA-COMPATIBLE SIDES (TYP.) 3, 357, 4, 467, 5, 56, 57
ABOVE.
ASPHALT
4,000 PSI CONCRETE POURED IN PLACE FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE AASHTO M43¹
CL SUCH THAT RIM WILL MEET FINISH GRADE. A CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3
SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. 3, 357, 4, 467, 5, 56, 57
PLEASE NOTE:
TOPSOIL 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".
REFER TO ASPHALT 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.
SOILTIGHT ADAPTER PAVEMENT DETAILS 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR
4" MIN
COMPACTION REQUIREMENTS.
SELECT EARTH
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
4. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.
5. WHERE RECYCLED CONCRETE AGGREGATE IS USED IN LAYERS 'A' OR 'B' THE MATERIAL SHOULD ALSO MEET THE ACCEPTABILITY CRITERIA OUTLINED IN TECHNICAL NOTE 6.20 "RECYCLED CONCRETE STRUCTURAL BACKFILL".
ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL NO: DATE: DESCRIPTION:
AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS
TYPE 1 OR 2 SUBBASE PAVEMENT LAYER (DESIGNED Revisions
BY SITE DESIGN ENGINEER)
2" DEEP x 2" WIDE
XX" STANDARD H-20 GRATE CONSTRUCTION JOINT MINIMUM COVER ELEVATION: XX
EXPOXY GROUT 100% 6"
PLAN SOLIDS (TYP.) 30" SQUARE
TYP. ALL WALLS D *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED
8'
PROJECT NUMBER:
PERIMETER STONE
C
INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,
INCREASE COVER TO 24" (600 mm). 18" (450 mm) (2.4 m) 2241067
CONNECT UNDERDRAIN WHERE SHOWN (SEE NOTE 4) MIN* MAX
OR PROVIDE (2) 10 FOOT STUBS OF 12" (300 mm) MIN
TOP CHAMBER ELEVATION: XX DRAWN BY:
PERFORATED PVC, OPPOSITE SIDES. B
100 YEAR PEAK ELEVATION: XX EMM / SCB
PRECAST SECTION ASTM C-478 EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
REVIEWED BY:
MEETING HS-20 LOADING 45" 10 YEAR PEAK ELEVATION: XX SRV / DPB
(1143 mm)
XX" DRAIN BASIN ISSUED FOR:
SEE PLAN
VARIES
BASE CHAMBER ELEVATION: XX SITE PLAN APPROVAL
A 1 YEAR PEAK ELEVATION: 1069.54 BASE STONE ELEVATION: XX
6" MIN.
9" (230 mm) MIN DATE:
(SEE NOTE 3) 4/20/2026
2.5' SEPARATION
6" (150 mm) MIN
SEE PLAN FOR DIAMETER MC-3500 6"
77" (1956 mm) 12" (300 mm) MIN
END CAP SUBGRADE SOILS (150 mm) MIN DRAWING NAME:
(SEE NOTE 3) **THIS CROSS SECTION DETAIL REPRESENTS
MINIMUM REQUIREMENTS FOR INSTALLATION.
GROUNDWATER ELEVATION: XX
6" MIN. STONE BEDDING
ALL CONCRETE
NOTES: PLEASE SEE THE LAYOUT SHEET(S) FOR
TO LIMITS OF EXCAVATION. PROJECT SPECIFIC REQUIREMENTS.
TO BE 4,000 PSI 1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS"
SAME MATERIAL USED
CHAMBER CLASSIFICATION 45x76 DESIGNATION SS.
6" MIN.
FOR SEWERS.
SOILTIGHT ADAPTER 2. MC-3500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
NOTES:
3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION
FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. REFERENCE STORMTECH DESIGN MANUAL FOR BEARING CAPACITY GUIDANCE.
CONSTRUCTION DETAILS
6" STONE BASE
4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.
1. THE ENTIRE EXTERIOR & INTERIOR SURFACES OF THE CATCH BASIN SHALL BE PAINTED WITH TWO COATS OF 5. REQUIREMENTS FOR HANDLING AND INSTALLATION:
BITUMASTIC COATING. · TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.
2. CATCH BASIN SHALL NOT BE CONNECTED TO ANY SANITARY SEWER. · TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3” (75 mm).
3. PROVIDE FRAMES AND GRATES CONFORMING TO NYSDOT STANDARD SHEETS M655-10R3, M655-6. · TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 500 LBS/FT/%.
SECTION 4. FRAMES TO HAVE APPROPRIATE STRAP ANCHORS. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS.
DRAWING NUMBER:
3 DRAIN BASIN 2 CATCH BASIN 1 MC-3500 CROSS SECTION
4/20/2026 1:17:45 PM
C504 N.T.S. C504 N.T.S. C504 N.T.S.
C504
Page 391 of 1493
Page 392
NOT FOR CONSTRUCTION
STANDARD C.I. MANHOLE FRAME & COVER.
SEE SPECIFICATIONS FOR COVER TYPE OPENING SHALL BE CORED & FILLED WITH EPOXY
MORTER SIKADUR 33 BY SIKE OR FLEXOLITH GEL
15" MAX. GRADE RINGS AS NECESSARY BY DURAL TO MAKE WATERTIGHT CONNECTION.
PRECAST OPENINGS ARE ALSO ALLOWED.
24" I.D. PRECAST REINFORCED CONCRETE PROVIDE FLEXIBLE WATERTIGHT CONNECTION.
WITH ECCENTRIC OPENING WILL BE GASKET SHALL MEET ASTM C-923
REQUIRED FOR MANHOLE WITH A 300 Pearl Street, Suite 130
12" MAX. DEPTH GREATER THAN 6'-0" FINISHED GRADE REMOVABLE CAST IRON COVER
LABEL "WATER" (PAINT BLUE)
Buffalo, NY 14202
TAPERED TOP 716-551-6281
ASTM C-748
labellapc.com
SEE NOTE 2 PRECAST REINFORCED CONC.
MANHOLE SECTION 2' 2-PIECE ADJUSTABLE
THROUGH 8' LENGTHS AS CAST IRON VALVE BOX
MINIMUM COVER
STEPS 12" O.C.
REQUIRED WITH A 4" HIGH MAX.
(SEE NOTE 5)
CAST IN PLACE .
TOP SECTION (ASTM C-478) " I.D STONE FULL WIDTH OF
24
COAT INTERIOR AND EXTERIOR TRENCH AROUND
WITH 2 COATS SIKAGARD 62, VALVE BOX
DURALKOTE 312 OR
GATE VALVE
APPROVED EQUIVALENT.
RUBBER GASKETS 12" MIN. WATER MAIN
(ASTM C-443) RETAINER GLAND
(SEE NOTE 6)
15" MAX.
EXP: EXP:
.
I.D
PIPE BEDDING CERTIFICATE OF AUTHORIZATION NUMBER:
3" MIN.
PLAN PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
8" MIN.
COMPACTED SELECT MINIMUM MANHOLE DIAMETERS UNDISTURBED EARTH SOLID CONCRETE BLOCK (MIN.
GEOLOGICAL: 0021659
GRANULAR FILL PIPE DIAMETERS 4" x 8" x 16") 1 REQUIRED AT
# OF NOTES: DIP WATER MAIN
CONNECTIONS 8" 10" 12" 15" 16" 18" 21" 24" 30" 36" 42" & UP It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
5,000 PSI CONCRETE 6" CRUSHER RUN SUBBASE COURSE, 1. VALVE BOXES SHALL BE CENTERED ON VALVE AND SET ON COMPACTED BACKFILL.
UNDISTURBED Sec. 7307, for any person, unless acting under the direction of a licensed
NYSDOT ITEM 304 TYPE 2 SOIL OR ROCK ONE 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' 2. VALVE SHALL NOT SUPPORT VALVE BOX. architect, professional engineer, or land surveyor, to alter an item in any
NOTE: 3. BODY AND BONNET BOLTS SHALL BE STAINLESS STEEL. way. If an item bearing the seal of an architect, engineer, or land surveyor
ELEVATION TWO 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' REQUIRES
4. VALVES SHALL BE OPEN RIGHT. is altered; the altering architect, engineer, or land surveyor shall affix to
SPECIAL
1. PRECAST REINFORCED CONCRETE BASE REQUIRED FOR MANHOLE WITH DEPTH GREATER THAN 4' 4' 4' 4' 4' 4' 5' 5' 5' 5' MANHOLE 5. MINIMUM COVER SHALL BE AS SHOWN ON WATER MAIN TRENCH DETAIL. the item their seal and notation "altered by" followed by their signature and
THREE
6'-0". 6. RETAINER GLANDS NOT REQUIRED AT HYDRANT GUARD VALVES. GUARD VALVES SHALL BE date of such alteration, and a specific description of the alteration.
2. REFER TO TABLE FOUR 4' 4' 4' 5' 5' 5' 5' 5' 5' 5' RESTRAINED WITH ANCHOR PIPE.
3. MANHOLES ARE TO BE FLANGED AND WATER TIGHT IN HIGH WATER TABLE AREAS 7. REFER TO PLANS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
© 2024
2026 LaBella Associates
8 CONCENTRIC STORM MANHOLE 7 MJ GATE VALVE
C505 N.T.S. C505 N.T.S.
MINIMUM MANHOLE DIAMETERS
# OF
CONNECTIONS
PIPE DIAMETERS
HOME LEASING
8" 10" 12" 15" 16" 18" 21" 24" 30" 36" 42" & UP
75 S CLINTON AVE SUITE 700,
2" MIN.
ONE 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' ROCHESTER, NEW YORK 14604
TWO 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' REQUIRES
SPECIAL
THREE 4' 4' 4' 4' 4' 4' 5' 5' 5' 5' MANHOLE
LETTERING FOUR 4' 4' 4' 5' 5' 5' 5' 5' 5' 5'
ON COVER
STANDARD CI MH FRAME & COVER W/ MORTAR LEVELING COURSE, IN WATERTIGHT CI MH FRAME & COVER, SET IN MORTAR 6 WATER QUALITY UNIT
PAVED AREAS WITH GROUND WATER LEVEL GREATER THAN 30" BELOW LEVELING COURSE, IN UNPAVED AREAS WITH GROUND
8" MIN THICK REINF. TOP C505 N.T.S. FINISHED GRADE
FINISHED GRADE. WATER LEVEL LESS THAN 30" BELOW FINISHED GRADE
SLAB WITH 24" DIA. (SANITARY ONLY)
OPENING, SEE NOTE 7
CONCRETE ADJUSTING RINGS WITH
MIN. COVER
FINISHED GRADE
SEE NOTE 3
BITUMASTIC COATING ON INTERIOR SURFACE
FINISHED GRADE PROPOSED OR
MAX.
PRECAST REINF. CONC. MH, ASTM C478, 2'
18"
EXISTING WATER
6' MIN. IN PAVEMENT
THRU 8' HEIGHT AS NECESSARY. 4' MAX PROPOSED OR MAIN
5' MIN. IN LAWN
HEIGHT FOR TOP SECTION. ECCENTRIC CONE PROVIDE WATERTIGHT CONNECTION. TRACER WIRE FOR EXISTING UTILITY
4" MAX. TOP SECTION NOT SHOWN, SEE NOTE 7 PRECAST USE PRECAST RUBBER GASKET. WATER SERVICE PIPE
MAX
RUBBER GASKETS AT JOINTS, (ASTM C443) OPENING
12"
BACKFILL WITH SELECT FILL 45° BEND
WITH BUTYL RESIN STRIP SEALANT, ASTM WYE BRANCH FOR DROPS OVER IN ROADWAY, SIDEWALK, AND
C990, ON INSIDE & OUTSIDE LEDGE BRICK OR PVC 4', TEE DROPS FOR UP TO 4' DRIVEWAY AREAS. USE NATIVE SEPARATION
CAP TO 1/2 ID D=
SOIL IN GRASS AREAS. COMPACT DISTANCE
6"
STEPS 12" O.C. COATING (SEE NOTE 8) PROVIDE VERTICAL
VERTICAL SEE TABLE CL IN A MAXIMUM OF 6" LIFTS. RESTRAINT IN
CL
ZONE
PIPE
CAST IN PLACE 30° BEND WHEN
ACCORDANCE WITH THE
WYE IS USED IN ROCK, BACKFILL PIPE
VERTICAL THRUST
WEST SENECA APARTMENTS
CENTERLINE OF MH
ZONE WITH SAND
BLOCK DETAILS (TYP.)
6"
SEE NOTE 2
VERT. DROP SAME SIZE 2544 CLINTON ST,
COMPACTED 1/2 ID WATER SERVICE
AS THE SEWER ENTERING WEST SENECA, NY 14224
SELECT
THE MH, 8" MIN. NOTES:
GRANULAR FILL CL
"DIM. A"
90° ELBOW CL
PROVIDE FLEXIBLE WATERTIGHT CONNECTION. 1. SEPARATION DISTANCE DIMENSION D, (OUTSIDE EDGE TO OUTSIDE EDGE) SHALL BE PROVIDED AS FOLLOWS:
GAS AND WATER LINES D = 12" MIN. SANITARY FORCEMAINS, STORM SEWERS, AND SANITARY SEWERS D = 18" MIN.
MIN.
GASKET SHALL MEET ASTM C-923 6" MIN. IN ROCK
6"
TRENCH LIMITS 2. ONE STANDARD FULL LENGTH OF WATER MAIN SHALL BE CENTERED UNDER THE SEWER SO THAT BOTH JOINTS WILL BE AS FAR FROM THE SEWER
MAX.
6" MIN. FORMED 12" MIN. IN SOIL
15"
NORMAL PIPE DIA + 24" AS POSSIBLE.
CONCRETE ENCASEMENT 3. MIN, COVER DEPTH - SEE WATER MAIN TRENCH DETAIL.
S
ID
L OF DROP, 3,000 PSI
PIPE BEDDING
5 WATER SERVICE TRENCH 4 TYPICAL WATER MAIN VERTICAL TRANSITION
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
12" MIN.
C505 N.T.S. C505 N.T.S. AT EXISTING PAVEMENT:
INITIAL SAWCUT TYPICAL
UNDISTURBED
3" MIN.
NO: DATE: DESCRIPTION:
MIN.
12" MIN. CRUSHED STONE: EXTEND MIN. 12" EACH SIDE OF TRENCH.
8"
UNDISTURBED GROUND
SUBBASE BEYOND EXTERIOR EDGES OF STRUCTURE EXISTING OR (SEE PAVEMENT JOINT DETAIL Revisions
GROUND 5.5' BURY HYDRANT TO BE
COURSE 4,000 PSI CONC. BENCH. SLOPE PROPOSED SURFACE FOR PAVEMENT RESTORATION)
PROVIDE DROP WHERE DIM. "A" IS EQUAL TO OR GREATER THAN 2' INSTALLED W/ 4-1/2" NOZZLE
TOP OF BENCH @ 1/2"/FT. MIN. FACING THE ROADWAY
SECTION A-A TO DRAIN
FOR SANITARY SEWERS, OR EQUAL TO OR GREATER THAN 5' FOR
STORM SEWERS, UNLESS NOTED OTHERWISE ON PLANS. PROJECT NUMBER:
SECTION A-A GRADE 2241067
(FOR OUTSIDE DROP CONNECTION & WATERTIGHT MH FRAME & COVER) DRAWN BY:
FOR SURFACE RESTORATION
REFER TO ADDITIONAL DETAILS
EMM / SCB
NOTES: VALVE BOX
REVIEWED BY:
12" MIN SRV / DPB
1. IF AN INVERT IS NOT GIVEN, THE CROWN OF THE INFLUENT SEWER(S) SHOULD BE AT THE TRENCH BACKFILL MATERIAL
RADIUS NOT SAME LEVEL OR ABOVE THE CROWN OF THE OUTLET SEWER. EXTENSION ISSUED FOR:
LESS
-ROADWAY SIDEWALK AND ALL DRIVEWAY
SITE PLAN APPROVAL
THAN 1/2 MH ID 2. PIPE CONNECTIONS 6" DIAMETER AND SMALLER MAY BE FIELD CORED. CORED OPENINGS IN SAFE OPERATION
MANHOLE RISER SECTIONS SHALL BE NOT LESS THAN 6" FROM A RISER JOINT. SHEET PILING AREAS: SELECT GRANULAR FILL.
WARNING DATE:
A A (AS REQUIRED) TAPE
3. ALL RISER JOINTS SHALL BE RUBBER RING GASKETS CONFORMING TO ASTM C443 WITH -NON PAVED AREAS: 4/20/2026
FLEXIBLE JOINT SEALER ON OUTSIDE OF JOINTS. BASE SHALL BE COMMON EARTH BACKFILL
#1 WASHED STONE FOR DRAWING NAME:
4. PRECAST BASES, RISER SECTIONS & TOP SLABS SHALL CONFORM WITH ASTM C478, W/ WIDTH OF HYDRANT TRENCH
FLOW
A
HS-20 LOADING AND 30% IMPACT LOADING DESIGN.
NEW FLEXIBLE CONNECTOR
NOTE:
PIPE ZONE
COUPLING PVC x APPLICABLE PIPE BEDDING MATERIAL:
SHAPED 5. CONCRETE FOR STRUCTURE SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF SOLID CONCRETE BLOCK
EXISTING MATERIAL AS 4,000 PSI. (MIN.: 8"x8"x16")
PIPE
O.D.
INVERT NYSDOT 703-0201 50-50 BEDDING AND BACKFILL MATERIAL
NECESSARY WITH STAINLESS WATER MAIN
MIXTURE OF PRIMARY INSTALLED & COMPACTED IN
MAX.
6. INVERT AND BENCH MAY BE CONSTRUCTED WITH BRICK OR POURED CONCRETE. PVC
2'-0"
STEEL SHEAR BAND MAXIMUM 6" LIFTS.
AND/OR ABS PIPE SHALL NOT BE USED WITHIN THE MANHOLE. SIZE 1 & 2
CONSTRUCTION DETAILS
B
7. ECCENTRIC CONE TYPE TOP SECTIONS FOR MANHOLES SHALL BE USED WHERE THE INSIDE IN ROCK, BACKFILL PIPE PIPE DIA. DIM. A DIM. B
SOLID CONCRETE BLOCK 6"x18" (MIN.) ANCHOR PIPE
HEIGHT DIMENSION FROM THE BENCH WALL TO THE BOTTOM OF THE ECCENTRIC SECTION MJ ANCHOR TEE, 6" OUTLET ZONE WITH SAND A A
EXCEEDS 8', OTHERWISE PROVIDE FLAT SLAB TOP SECTIONS. (MIN.: 4"x4"x8") UP TO 18" 1'-0" (MIN.) 6"
EXISTING RCP, CIP 6" MJ GATE VALVE 6" MIN. PIPE 6" MIN.
OR VTP TO REMAIN 8. INSIDE AND OUTSIDE OF MANHOLE TO BE EPOXY COATED TO ONE FOOT ABOVE THE HIGHEST NOTES: IN ROCK O.D. IN ROCK 19" TO 36" 1'-6" (MIN.) 9"
PIPE CROWN. AREAS OUTSIDE OF ONE FOOT ABOVE HIGHEST PIPE CROWN TO RECEIVE TWO
COATS OF BITUMASTIC COATING ON BOTH THE INSIDE AND OUTSIDE OF MANHOLE. 1. HYDRANT TO BE MUELLER SUPER CENTURION 250 - MODEL A-423 OR APPROVED EQUAL. OVER 36" 2'-0" (MIN.) 12"
2. HYDRANT TO BE PAINTED RED.
3. HYDRANT MAIN VALVE SEAT SHALL BE 4 1/2" IN DIAMETER. DRAWING NUMBER:
4. HYDRANT VALVE TO TURN LEFT.
SANITARY MANHOLE HYDRANT ASSEMBLY STORM/SANITARY SEWER TRENCH AND PIPE BEDDING
4/20/2026 1:17:28 PM
3 2 1
C505 N.T.S. C505 N.T.S. C505 N.T.S.
C505
Page 392 of 1493
Page 393
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
VALVE BOX COVER SHALL 716-551-6281
BE LABELED "WATER"
FINISHED GRADE
labellapc.com
ROW
CURB STOP
TRACER WIRE RAN UP
OUTSIDE OF BOX, AS
REQUIRED
THREE PIECE CAST IRON
VALVE BOX
APPROVED BACKFILL
EXP: EXP:
MATERIAL
TAP VALVE (FLxMJ)
FUTURE CURB BOX CERTIFICATE OF AUTHORIZATION NUMBER:
5'-0" MIN.
TAPPING SLEEVE PROFESSIONAL ENGINEERING: 0021272
APPROVED BEDDING LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
MATERIAL
FUTURE CONNECTION TO
SOLID CONCRETE
EXISTING SERVICE WITH
BLOCKS (TYP.)
CURB STOP SUPPORTED It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
BY A SOLID CONCRETE Sec. 7307, for any person, unless acting under the direction of a licensed
BLOCK (4"x8"x8") architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
3
4", 1", OR 2" TYPE 'K'
COPPER TUBING © 2024
2026 LaBella Associates
CORPORATION STOP
UNDISTURBED EARTH WATERMAIN
NEW WATERMAIN
SOLID CONCRETE BLOCK
(4"x8"x16") WITH SOLID CONCRETE BLOCK
HARDWOOD SHIMS (4"x8"x16") WITH
HARDWOOD SHIMS
HOME LEASING
NOTES: 75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
1. VALVE SHALL NOT SUPPORT VALVE BOX.
NOTES:
2. TAP VALVE SHALL BE INSTALLED LEVEL AND VERTICALLY PLUMB.
1. AFTER COMPLETION OF TESTING, THE SAMPLE POINT SHALL BE UTILIZED FOR A SERVICE CONNECTION. IF UNABLE TO UTILIZE FOR A SERVICE
REPLACE THE CORPORATION STOP IN PIPE WITH A THREADED BRASS PLUG. 3. VALVE BOX SHALL BE PLUMB TO GRADE, WITH OPERATING NUT CENTERED IN BOX.
5 TEMPORARY BLOW-OFF / SAMPLE POINT 4 TAPPING SLEEVE AND VALVE
C506 ECWA STANDARD DETAIL C506 ECWA STANDARD DETAIL
B B B TRENCH UNDER OR WITHIN 5'-0" OF
ASPHALT OR CONCRETE PAVEMENT,
TRENCH UNDER OTHER AREA DRIVEWAY, SIDEWALK OR PARKING LOT
TRENCH UNDER OR WITHIN 5'-0" OF
ASPHALT OR CONCRETE PAVEMENT, PAYMENT LIMIT
A
A
A
TRENCH UNDER OTHER AREA DRIVEWAY, SIDEWALK OR PARKING LOT FOR ASPHALT
AND CONCRETE
1'-0" RESTORATION
TYP.
WEST SENECA APARTMENTS
A
A
A
PAYMENT LIMIT FOR
EXISTING GRADE ROCK EXCAVATION
INITIAL SAW CUT
2544 CLINTON ST,
AND SELECT FILL 1'-0"
PLAN PLAN PLAN WEST SENECA, NY 14224
FINAL SAW CUT
SOLID CONCRETE SOLID CONCRETE
SOLID CONCRETE EXISTING GRADE EXISTING PAVEMENT
BLOCK (TYP.) BLOCK (TYP.)
BLOCK (TYP.)
C
C
C
4'-0" MIN. COVER (PIPE ≥16")
5'-0" MIN. COVER (PIPE <16")
C
C
C
1'-6" CLEARANCE BETWEEN EXISTING SUITABLE EXCAVATED
UTILITY AND TOP OF WATERMAIN / CASING BACKFILL (PROPERLY
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
(INCREASE TO 3'-0" WHEN CROSSING STORM SELECT BACKFILL COMPACTED) DETECTABLE TAPE IN TRENCH 1'-6"
PROFILE PROFILE PROFILE SEWERS >36") (COMPACTED IN 6" LIFTS) BELOW GRADE (CONNECTED TO
1'-0" (PIPE <16") VALVE BOXES) NO: DATE: DESCRIPTION:
DEAD END HORIZONTAL BEND TEE PIPE BEDDING 2'-0" (PIPE ≥16")
Revisions
TYP. SELECT BACKFILL
(COMPACTED IN 6" LIFTS)
6"
PROJECT NUMBER:
2241067
H
6"
TRACER WIRE (NON-METALLIC PIPE), TAPED
AT 5'-0" INCREMENTS TO THE CROWN OF DRAWN BY:
EMM / SCB
6"
PIPE (CONNECTED TO VALVE BOXES)
WATERMAIN REVIEWED BY:
PLAN SRV / DPB
EPOXY COATED #5 PIPE BEDDING
6"
ISSUED FOR:
REBAR (TYP.) UNDISTURBED EARTH OR
ROCK TRENCH BOTTOM
SITE PLAN APPROVAL
WATERMAIN
DATE:
4/20/2026
D
UNDISTURBED EARTH OR
12" ROCK TRENCH BOTTOM
DRAWING NAME:
W
NOTES: 2" RIGID INSULATION BOARD, PLACED
ON TOP AND EACH SIDE
PROFILE 1. ALL EXISTING UTILITIES MUST BE SUPPORTED WITH APPROPRIATE CHAINS / STRAPS DURING CONSTRUCTION OF THE NEW WATERMAIN.
CONTRACTOR IS REQUIRED TO COORDINATE WITH THE OWNER FOR THEIR PREFERRED SUPPORT REQUIREMENTS.
2'
VERTICAL BEND 2. WHEN CROSSING A SEWER LINE WITH NEW WATERMAIN (AND WITHOUT A CASING PIPE), ONE FULL LENGTH (18'-0" MIN.) SHALL BE USED AT CONSTRUCTION DETAILS
W THE POINT OF CROSSING. THE WATERMAIN SHALL BE PLACED SO THAT BOTH JOINT ENDS ARE AS FAR AS POSSIBLE FROM THE EXISTING
NOTE: SEWER. FROST PROTECTION TRENCH
(COVER <4'-0")
FULL CONCRETE THRUST BLOCKS AS SHOWN ARE REQUIRED WHEN THRUST 3. IF CASING PIPE IS USED, IT SHALL EXTEND 5'-0" BEYOND THE EXISTING PIPE OUTER EDGE IN EACH DIRECTION, AND NO WATERMAIN JOINTS ECWA APPROVAL REQUIRED
RESTRAINT IS NOT PROVIDED BY OTHER MEANS SUCH AS MJ RESTRAINTS *LENGTHS SHOWN ARE MINIMUM REQUIREMENTS OR FITTINGS SHALL BE LOCATED WITHIN 4'-0" FROM THE CASING PIPE EDGE.
DRAWING NUMBER:
3 THRUST BLOCKS 2 PIPE CROSSING DETAIL 1 TYPICAL TRENCH DETAIL
4/20/2026 1:17:25 PM
C506 ECWA STANDARD DETAIL C506 ECWA STANDARD DETAIL C506 ECWA STANDARD DETAIL
C506
Page 393 of 1493
Page 394
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2024
2026 LaBella Associates
HOME LEASING
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
4 STANDARD FRAME AND COVER DETAIL 3 CLEANOUT IN PAVEMENT/SIDEWALK DETAIL
C507 ERIE COUNTY SEWER STANDARD DETAIL C507 ERIE COUNTY SEWER STANDARD DETAIL
WEST SENECA APARTMENTS
2544 CLINTON ST,
WEST SENECA, NY 14224
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
NO: DATE: DESCRIPTION:
Revisions
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
CONSTRUCTION DETAILS
DRAWING NUMBER:
4/20/2026 1:17:17 PM
2 CLEANOUT DETAIL FOR SERVICE CONNECTION 1 TYPICAL COMMERCIAL SERVICE WITHOUT BASEMENT DETAIL
C507 ERIE COUNTY SEWER STANDARD DETAIL C507 ERIE COUNTY SEWER STANDARD DETAIL
C507
Page 394 of 1493
Page 395
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2024
2026 LaBella Associates
HOME LEASING
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
WEST SENECA APARTMENTS
2544 CLINTON ST,
WEST SENECA, NY 14224
FURNISH AND INSTALL IN LINE FUSES.
BUSSMAN "TRON" WEATHERPROOF FUSES NO: DATE: DESCRIPTION:
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
GASKETED HAND HOLE HOLDERS #HEB-AD WITH "LP-CC" TIME DELAY Revisions
FUSES FOR EACH LUMINAIRE
VARIES - CONCRETE BASE TO BE INSTALLED FLUSH WITH PROJECT NUMBER:
3 PARKING LOT STEEL POLE (MC-01 POLE) FINISHED GRADE OR UP TO 36" EXPOSED. REFER TO SITE
LIGHTING SUMMARY ON UTILITY PLAN(S)
2241067
C508 N.T.S. 36" DRAWN BY:
MAX EMM / SCB
FINISHED GRADE REVIEWED BY:
SRV / DPB
GALVANIZED STEEL 'J' BOLTS (TYP. OF 4) ISSUED FOR:
3" MIN SITE PLAN APPROVAL
COVER
1" PVC SCHEDULE 80 CONDUIT DATE:
24" MIN
(TYP. OF 2) 4/20/2026
66" MIN
DRAWING NAME:
#6 CU GROUND WIRE 3/4" PVC SCHEDULE 80 CONDUIT FOR GROUND
ROD. CONNECTION AS REQUIRED.
EXOTHERMIC WELD
6#6 VERTICAL RODS AND
#3 TIES @ 12" O.C.
1/2"Øx8' CU DRIVEN
24"Ø CONSTRUCTION DETAILS
GROUND ROD.
PVC CONDUIT FITTING
DRAWING NUMBER:
2 TYPICAL SITE LIGHTING POLE BASE DETAIL 1 LIGHTING FIXTURES / PHOTO METRICS
4/20/2026 1:17:42 PM
C508 N.T.S. C508 N.T.S.
C508
Page 395 of 1493
Page 396
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
WOVEN TREE STAKING MATERIAL (DEEPROOT ARBORTIE OR
APPROVED EQUAL, TWO TIES PER TREE, SPREAD 180° APART).
LOCATE 6" FROM TOP OF STAKE UP TO LOWEST BRANCHES.
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
TWO 3" DIAMETER X 8' CEDAR STAKE
ABOVE GROUND TO LOWEST BRANCHES GEOLOGICAL: 0021659
GROUND LINE TO BE SAME AS AT THE
1 NURSERY
2 ROOT BALL DIAMETER
GROUND LINE TO BE THE SAME AS AT THE NURSERY. It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
REMOVE ALL TWINE & STRAPS. CUT AND REMOVE TOP 1/3 OF Sec. 7307, for any person, unless acting under the direction of a licensed
BURLAP. WIRE CAGE AND ALL SYNTHETIC MATERIALS SHALL PRUNE ONLY DEAD, BROKEN OR
architect, professional engineer, or land surveyor, to alter an item in any
BE TOTALLY REMOVED. DAMAGED BRANCHES
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
SET TOP OF ROOT BALL FLUSH TO GRADE 3" SHREDDED HARDWOOD MULCH - EXTEND date of such alteration, and a specific description of the alteration.
OVER SAUCER BERM
3" DEPTH SHREDDED HARDWOOD MULCH; KEEP
6" FROM TRUNK OF TREE TO MAINTAIN A VISIBLE ROOT CONSTRUCT EARTH SAUCER WITH 4" HIGH
FLARE. BERM © 2024
2026 LaBella Associates
CONSTRUCT EARTH SAUCER WITH 4" HIGH BERM-FLOOD
WITH WATER TWICE IN FIRST 24 HRS. REMOVE ALL TWINE & STRAPS. CUT AND REMOVE BURLAP
~
AND WIRE BASKET FROM TOP 1/3 OF ROOTBALL. REMOVE
ALL SYNTHETIC MATERIALS AND TAGS.
BREAK UP OR LOOSEN
6"
MIN
BACKFILL WITH PLANTING SOIL MIXTURE IN 9"
HOME LEASING
SUBSOIL LAYERS. WATER EACH LAYER UNTIL SETTLED. DO 75 S CLINTON AVE SUITE 700,
BACKFILL WITH PLANTING SOIL MIXTURE
2X ROOT BALL DIAMETER
IN 9" LAYERS. WATER EACH LAYER UNTIL SETTLED. DO NOTE: NOT TAMP. ROCHESTER, NEW YORK 14604
NOT TAMP. 1. PROVIDE A CONTINUOUS MULCHED PLANTING BED FOR
NOTE: ALL SHRUB PLANTINGS.
1. REMOVE STAKES AND GUYS AT THE END OF BREAK UP OR LOOSEN SUBSOIL WITH A PICK 2. DO NOT OVERSEED SHRUBS IN PLANTING BEDS OR
THE FIRST GROWING SEASON AFTER PLANTING PITS IN MAINTAINED LAWN AREAS
2. PROVIDE A 6' DIA. MULCHED PLANTING BED AROUND EACH TREE.
3. DO NOT OVERSEED TREE PLANTING PITS IN MAINTAINED LAWN AREAS.
DECIDUOUS TREE PLANTING 3 SHRUB PLANTING
4
L501 N.T.S.
L501 N.T.S.
2" DEPTH MULCH
WEST SENECA APARTMENTS
2544 CLINTON ST,
WOVEN TREE STAKING MATERIAL (DEEPROOT WEST SENECA, NY 14224
SUBSOIL TO BE 18" DEEP BED OF PLANTING
ARBORTIE OR APPROVED EQUAL)
BROKEN WITH SOIL MIXTURE
A PICK AXE
3" DIAMETER X 8' CEDAR OR
PRESSURE TREATED STAKE, TWO NOTE: GROUND COVERS SHALL BE POT OR CONTAINER GROWN.
OPPOSITE.
SET TOP OF ROOT BALL FLUSH TO GROUNDCOVER SECTION
GRADE
GROUND LINE TO BE THE SAME AS
AT THE NURSERY. REMOVE ALL PLANTS SHALL BE SET AT THE
TWINE & STRAPS. CUT AND REMOVE 2" DEPTH MULCH;
SAME GROUND LINE AS IN THE
TOP 1/3 OF BURLAP. WIRE CAGE AND ALL SYNTHETIC DO NOT MOUND
CONTAINER
MATERIALS SHALL BE TOTALLY REMOVED. MULCH OVER ROOT
NO: DATE: DESCRIPTION:
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
COLLAR
PLANTING SOIL FIRM SOIL AROUND Revisions
3" MIN. SHREDDED HARDWOOD MULCH - ROOT BALL WITH HANDS
KEEP 6" FROM TRUNK OF TREE, TO MAINTAIN VISIBLE MIXTURE
ROOT FLARE
PROJECT NUMBER:
SUBSOIL
2241067
DRAWN BY:
CONSTRUCT EARTH SAUCER WITH 4" HIGH EMM / SCB
BERM-FLOOD WITH WATER TWICE IN FIRST 24 PERENNIAL SECTION
HRS. REVIEWED BY:
SRV / DPB
BACKFILL WITH PLANTING SOIL MIXTURE IN 9" LAYERS.
WATER EACH LAYER UNTIL SETTLED. DO NOT TAMP. NOTES: ISSUED FOR:
1. PROVIDE 18" DEPTH PLANTING SOIL MIX , ADD SITE PLAN APPROVAL
BREAK SUBSOIL WITH A PICK FERTILIZER WHEN MIXING. DO NOT COMPACT AFTER PLANTING.
2X ROOT BALL DIA.
2. WATER THOROUGHLY AFTER PLANTING. DATE:
4/20/2026
3. PROVIDE WELL DRAINING SUBSOIL WHEN SOIL IS HEAVY
NOTE: OR COMPACTED. DRAWING NAME:
1. REMOVE STAKES AND GUYS AT THE END OF
4. PLANTS SHALL BE REMOVED FROM ALL CONTAINERS WHEN
THE FIRST GROWING SEASON AFTER PLANTING
PLANTED, UNLESS OTHERWISE STATED IN THE PLANT SCHEDULE.
2. PROVIDE A 6' DIA. MULCHED PLANTING BED AROUND EACH TREE.
3. DO NOT OVERSEED TREE PLANTING PITS IN MAINTAINED LAWN AREAS.
EVERGREEN TREE PLANTING PERENNIAL - GROUNDCOVER PLANTING
2 1 LANDSCAPE DETAILS
L501 N.T.S. L501 N.T.S.
DRAWING NUMBER:
4/20/2026 1:17:53 PM
L501
Page 396 of 1493
Page 397
FIBER CEMENT PANEL - BRICK -
HARDIE "COBBLESTONE" WATSONTOWN "ELK"
FIBER CEMENT BOARD
AND BATTEN -
HARDIE "IRON GRAY"
ALTERNATE MATERIAL: ALTERNATE MATERIAL:
FIBER CEMENT SIDING FIBER CEMENT SIDING
- HARDIE "BOOTHBAY BLUE" - HARDIE "MONTEREY TAUPE"
VINYL SIDING - VYTEC VINYL SIDING - VTEC
PRESTIGE "LAKESHORE BLUE" PRESTIGE "SPRING MEADOW"
3D View and Material Palette
Home Leasing - West Seneca
Page 397 of 1493
Page 398
T.O. PARAPET E9 E3
+37' - 0" ELEVATION KEY NOTES
E8
T.O. ROOF NO. DESCRIPTION
+32' - 0" E1 MASONRY VENEER. COLOR AND PATTERN TBD.
E2 FIBER CEMENT PANEL SYSTEM. COLOR TBD
E11 E3 FIBER CEMENT BOARD AND BATTEN SYSTEM. COLOR TBD
LEVEL 3 VINYL LAP SIDING, 7" EXPOSURE. COLOR TBD. (ALTERNATE MATERIAL: FIBER CEMENT
E2 E4
+22' - 0" SIDING)
E5 ALUMINUM STOREFRONT SYSTEM. COLOR AND FINISH TBD.
E6 EXTERIOR WALL SCONCE. FIXTURE TBD.
LEVEL 2
E7 FRAMED CANOPY W/ GFRC CORNICE
+12' - 0" E7
E8 ROOF PARAPET W/ GFRC CORNICE
E4 E9 6" TRIM BOARD
E10 12" TRIM BOARD AND ALUMINUM PARAPET COPING
LEVEL 1
E11 VINYL DOUBLE HUNG WINDOW. COLOR AND TRIM TBD
+0' - 0"
E5 E1
EXTERIOR ELEVATION - WEST
4 1/16" = 1'-0"
T.O. PARAPET E9 E3 E8 E2 E10
+37' - 0"
T.O. ROOF
+32' - 0"
E11
LEVEL 3
+22' - 0"
LEVEL 2
+12' - 0"
E4
LEVEL 1
+0' - 0"
E4 E1 E4
3 EXTERIOR
1/16" = 1'-0"
ELEVATION - NORTH
T.O. PARAPET
E2 E9 E3 E8
+37' - 0"
T.O. ROOF
+32' - 0"
E11
LEVEL 3
+22' - 0"
E2
LEVEL 2
+12' - 0"
E4
LEVEL 1
+0' - 0"
E1 E4 E4 E1
EXTERIOR ELEVATION - EAST
2 1/16" = 1'-0"
T.O. PARAPET E3 E2 E8 E9 E1
+37' - 0"
T.O. ROOF
+32' - 0"
E11
LEVEL 3
+22' - 0"
LEVEL 2
E4
+12' - 0"
LEVEL 1
+0' - 0"
E4 E4 E7 E5 E6 E1
1 EXTERIOR
1/16" = 1'-0"
ELEVATION - SOUTH
Exterior Elevations
Home Leasing - West Seneca
Page 398 of 1493
Page 399
A-3
3
3 BR
UNIT
3 BR W D
UNIT
DEAD END
15' - 1"
W D
STAIR 2
190 SF
UP
3-STORY BLDG - UNIT COUNTS EXISTING MANSION - UNIT COUNTS
1 BR = 15 UNITS 1 BR = 9 UNITS
2 BR = 25 UNITS 2 BR = 4 UNIT
3 BR = 20 UNITS 3 BR = 2 UNITS
W D
MAINT. SHOP EQUIP STOR.
397 SF 332 SF
60 UNITS TOTAL 15 UNITS TOTAL
SITE TOTAL: 75
3 BR
1 BR: 24 UNITS
2 BR: 29 UNITS UNIT
3 BR: 22 UNITS
COMPACTOR
RECYCLING 237 SF
102 SF
COMMUNITY ROOM MECH
848 SF 32 SF
2 A-3
TLT
56 SF
FITNESS
536 SF
TLT
56 SF
ELEV
122 SF
3 BR ELEC / WATER
UNIT D W
2 BR 1 BR 2 BR W D D W
2 BR 1 BR 2 BR W D
DATA
93 SF
722 SF
UNIT UNIT UNIT UNIT UNIT UNIT
A-3 4
JAN. MECH
D W
116 SF 116 SF
19' - 8 3/4" STOR.
DEAD END 49 SF
TLT
MAIL
D W
UP 68 SF
143 SF
OFFICE RECEPTION
167 SF 396 SF
3 BR STAIR 1
LOBBY
356 SF
UNIT 189 SF D W W D D W W D
1 BR 2 BR 2 BR 3 BR 2 BR DATA MECH
CONFERENCE
UNIT UNIT UNIT UNIT UNIT PKGS
203 SF FILES WORK RM
111 SF MECH/ 137 SF
VEST. STOR.
68 SF 38 SF
N
1
A-3
First Floor Plan
Home Leasing - West Seneca
Page 399 of 1493
Page 400
A-3
3
3 BR
UNIT
3 BR W D
UNIT
W D
STAIR 2 DN
190 SF
UP
W D
2 BR
3 BR UNIT
UNIT
TRASH CHUTE /
RECYCLING
120 SF
2 BR
UNIT
2 A-3
D W
1 BR
UNIT
3 BR DATA
1 BR
UNIT D W
2 BR 1 BR 2 BR W D D W
2 BR 1 BR 2 BR W D
93 SF
UNIT
UNIT UNIT UNIT UNIT UNIT UNIT
A-3 4
D W
JAN. MECH
116 SF 116 SF
STAIR 1
D W
D W
189 SF
UP
3 BR DN
3 BR
UNIT D W W D D W W D
UNIT
1 BR 2 BR 2 BR 3 BR 2 BR 1 BR
UNIT UNIT UNIT UNIT UNIT UNIT
N
1
A-3
Second and Third Floor Plans
Home Leasing - West Seneca
Page 400 of 1493
Page 401
3 BR
UNIT
1 BR 2 BR
UNIT UNIT
LAUNDRY
216 SF
1 BR
MAINTENANCE OFFICE
UNIT
235 SF
1 BR 1 BR
UNIT UNIT
3 BR
UNIT
1 BR
UNIT
SECOND FLOOR PLAN
2 1/16" = 1'-0"
2 BR
UNIT
DN UP
UP
1 BR 1 BR
UNIT UNIT
LAUNDRY
184 SF
2 BR
FITNESS 2 BR
UNIT 1 BR UP
309 SF UNIT
UNIT
DN
3 BR DN LOBBY/MAIL
OFFICE
UNIT 257 SF
142 SF
CONCEPTUAL RENDERING CONF. RM
OFFICE
206 SF
311 SF
ENTRY
169 SF
N
FIRST FLOOR PLAN
1 1/16" = 1'-0"
Existing Building Plans and Rendering
Home Leasing - West Seneca
Page 401 of 1493
Page 402
LINE LEGEND SYMBOL LEGEND I-90
CAYUGA CREEK ROAD
SECTION/PARCEL BOUNDARY D DRAINAGE MANHOLE E ELECTRIC MANHOLE
MIN. BUILDING SETBACK EM
CENTER LINE INLET DRAINAGE MANHOLE ELECTRIC METER
EK
A CRE
EXIST. EASEMENT LINE CATCH BASIN T TELEPHONE MANHOLE CAYUG
EXIST. RIGHT-OF-WAY LINE
EXIST. EDGE OF PAVEMENT
END SECTION TP TELEPHONE PEDESTAL
WV H
END OF PIPE PROJECT
D
Y
EXISTING WATER MAIN, VALVE, & HYDRANT.
1720'±
W PEDESTRIAN POLE
EXISTING SANITARY SEWER, & MANHOLE.
S MANHOLE TRAF.
LOCATION
HARLEM ROAD
MH
EXISTING DRAINAGE SEWER, FIELD INLET, SIG. TRAFFIC CONTROL CABINET
D CAB.
INLET MANHOLE, MANHOLE, & END SECTION. S SANITARY MANHOLE FRENCH ROAD
8 LAMP POST
57 57 OH OH EXISTING OVERHEAD UTILITIES
8 C.O. CLEAN OUT
LIGHT POLE
T T EXISTING TELEPHONE GV
GAS VALVE UTILITY POLE WITH LIGHT
UG UG EXISTING UNDERGROUND UTILITIES
GS
UNION ROAD
579 583
C
G G EXISTING GAS GAS SERVICE FLAG
LI
580 5
81 FLAG POLE
N
GM POLE
TO
E E EXISTING ELECTRIC
582 583 GAS METER
N
584 MAILBOX
ST
585
EXISTING GUARD RAIL SV
R
MB
BU
586
M
583
EE
58 SPRINKLER VALVE
IN
585 0
T
BOLLARD
FF
582 587 TREE,HEDGE,EDGE OF WOODS
ER
AL
SH
AL
581
SPRINKLER HEAD
O
8 POST
SP
580
57 EXISTING SWALE
CR
RI
WV
NG
EE
5 88 X , , BARBED WIRE,STOCKADE,CHAIN LINKED FENCE WATER VALVE
SIGN
S
K
RO
58 WS
5 410 EXISTING CONTOUR
AD
' WATER SERVICE
589
" E 71.00 590
x 420.4 EXISTING SPOT ELEVATION @ X
SIGN
9
2159'1 1
HYDRANT
SIGN
N76°
TO
592 CONCRETE PAD/ CONCRETE SIDEWALK
P
WM
OF
WATER METER
580
TURNING ARROW INDIAN CHURCH ROAD
BA
7
NK
58
WELL
HANDICAP
CA
9 '
BORE
.3 STOP BAR
5
STOP
YU
58
9
16 C CABLE TV PEDESTAL TREE DECIDUOUS
S3
LOCATION SKETCH
GA
"E
2°
SIGNAL POLE TREE CONIFEROUS
41
14
NOT TO SCALE
5'
CR
5 BUSH
'
UTILITY POLE
12
°
EE
45
"E
GUY WIRE AC AIR CONDITIONING UNIT
N
K
N SAN
20
PULL BOX SANITARY UTILITY LATH
6
6.2
58
593 ELECTRIC PULL BOX G GAS UTILITY LATH
2'
5 ELEC.
58
RIM=593.19
(NO ACCESS)
S
TELEPHONE PULL BOX
W WATER UTILITY LATH
UTILITY INFORMATION
TELE. T TELEPHONE UTILITY LATH
58
5
TR TRAFFIC PULL BOX UTILITY INFORMATION PER UFPO DESIGN TICKET # 10313-000-071-00
594 E ELECTRIC UTILITY LATH
GRID
57 DATED OCTOBER 31, 2023
9
T TRANSFORMER C CABLE UTILITY LATH
595 1. BUCKEYE PIPELINE COMPANY 610-904-4475
586
N00° 32' 17"E 174.62'
2
59
2. CHARTER COM NORTHEAST WESTERN NY 317-575-7800 x2
RIM=594.92
(NO ACCESS)
593 3. ERIE COUNTY DIVISION OF SEWER MANAGEMENT 716-858-8760
587
57
8
S
S4
4. ERIE COUNTY WATER AUTHORITY 716-685-8207
3°
42
BO
5. NATIONAL FUEL GAS | BUFFALO - NFG101 716-857-7431
6
'1
59 TT
OM
594
7"
OF 6. NYS THRUWAY AUTHORITY | BUFFALO 716-635-6224
BA
E
GATE NK
17
7. NYSEG LANCASTER ELECTRIC 585-484-5115
8.
00
8. TOWN OF CHEEKTOWAGA 716-686-3450
'
7
59
579
BO 9. TOWN OF WEST SENECA HIGHWAY 716-674-5600 x261
T TO
M
OF
57 BA 10. VERIZON | BUFFALO 315-937-2515
8 N
8 59 K
587
CE
S5 58
0 NT
ER
9° LIN
95
2 9' 58
5
E
OF
'±
CR
5
13 E
"E EK
74
59
'
0
580
585
59 .72
599
58
11
59
139 0
6
5
59
7.8
4
TO
596 59
7 PO
FB 5'
AN
599
58 40 K
.8'
.7'
6 8
E
59
20
38"
FE
NC
599 ONE STORY 6.9 E
' 1" PIN
600 FRAME GARAGE
31'
APPROXIMATE LOCATION 0.4' ABOVE
FF=599.29'
EASEMENT TO ERIE COUNTY GRADE
°
SEWER DISTRICT #4
N22
PER REF. 4 TWO STORY
0
FRAME BARN 60
FF=600.25'
59
7"
.8'
.4'
30
13"
6
58
20" 600
N CE
ONE STORY
FE
FRAME BUILDING
7
IC
58
E
FF=600.15'
T
599
NC
AS
6" PVC
FE
PL
S
D
'
D
RIM=602.51
.98
OO
AN
48" 32" 599 (NO ACCESS)
W
C
PV
OD
2
4'
CONCRETE 4"
18
WO
596.80
580
585
E 0
5'
0" 59
STONE / 5
6.9 N/F
CONCRETE 59
CLINTON STREET REALTY
GRILL
'1
14" HOLDINGS
27
5
TG=598.70 T.A.# 124.00-2-5
59
2544 CLINTON STREET
8
6°
57
9
LIBER 11299 PAGE 9093
59
N3
ASPHALT AREA = 9.402 ACRES TO
TIE LINE
AREA = 12.733 ACRES TO
8
59
C.O. 36" 8" CENTERLINE OF CREEK 0
36" 60
ASPHALT
4"
C.O.
18"
6
59
30" 600
8"
8' 32"
T1
1
EK
0
7.
T2
24"
60
LO
11
LO
BA
NK
R E DEAD
8
59
O
F
C " E 59
7 10"
GA
M CONCRETE PAD
O
TT
37 W/ HVAC UNITS 15" STUMP
BO '
Y U 0 32"
7' HIGH
°5
CA
10"
9 TWO STORY
45 NK 59 10" STUMP
EK
K 24" BLOCK/FRAME 7' HIGH
B AN N O F BA BUILDING 600
E
RE
OF P 36" 10"
DOWNSPOUT
LIN WOODS
M TO 32"
TO DOWNSPOUT
FC
T 4"
BO
N60° 14' 10"W 1'
TIE
.4
EO
97 T GM FF=600.70'
69'± FF=602.53'
TO
8" 16"
2"E
LIN
T 30" 34"
' 5 15" 599
16
0'
ER
6
5
°
3.4
59
59
58 597
N/F
NT
K
N
T
EE
8"
73
CLINTON STREET REALTY
4
T 16"
59
593
30"
CR
8 15" HOLDINGS
CE
59
580 36"
OF
T.A.# 124.00-2-8
59
MB 13" 21
NE
6.7 2602 CLINTON STREET
2
'
1.3
O
T '
LI
5 LIBER 11299 PAGE 9093
58
ER
CONCRETE W/
19
FLAG 13" 598
'±T
15"
NT
0 POLE OVERHANG
577 59 48" 15"
CE
7
5 ORIGINAL
80
59 T ASPHALT
N18° 32' 09"E 48"
NORTHERLY RIGHT 21
7
8"
E 4.1
57
OF WAY LINE OF T ET '
VT
WV 49.86' CLINTON STREET NC
R
P
OH
CO 598
CONCRETE WALL TRUCK ROUTE W/ H
75
WV 597
35 MPH
36" MILE MARKER x.
'W
W 354/5301/2009 1.4
'
5.8
S69
59
APPROXIMATE LOCATION
19
T 1
4.0
APPROPRIATION OF LANDS ° 30 3' STONE WALL 10' WIDE EASEMENT TO 4.3 599
T 59
3
FOR HIGHWAY PURPOSES
W ' 45 BOX BEAM NEW YORK STATE
595
LIBER 9006 PAGE 213 "E GUIDE RAIL ELECTRIC & GAS
600 CORPORATION TG=595.23
W 599 598 NYSEG 596
PER REF. 4
"E
494 T
9
60
59
W
303
2
LO 597
50
NO #
LO T 1
60
1
T3
4
.36' 598
'
45
28" 24"
W W
9°
599
24"
N2
600 G 24"
W
GATE
W GATE
OH
FE
NC
6.2 E ONE STORY
6' CHAIN '
WV 3' STONE WALL 1-1/4" FRAME GARAGE
12" LINK FENCE PIPE
2.6 FF=601.19'
OH W
CL W N6 20" '
S60° 14' 10"E
0°
OH IN TO 14 19" 0 88.00'
.7'
'1 60 2.5
.3'
'
15
494/38
NS 0"W
20
G 15"
TR G 20" 22
.5'
WOOD
W
E 601 W
0'
OH GAZEBO
(W ET (
60
18"
D
Y
H
1.0
0
#2561 22"
AP
G IDT N.Y PR
O
3.0
'
13
X
HV .S.
'
IM
0
AT TWO STORY
OH
R
1.0
EL
AR
W I O OC G
FRAME HOUSE
16
.5'
25"
APP G ES) UT AT W
IO
25
FF=605.33'
CONCRETE
13
'
ROX N1
E
9.7
IMA 2" 7.6 1 STEPS 600
T E LO
CAT
OH W
354 AT
ER 2'
60 4.0
'
) N/F
.6'
ION
'
OH
6.6
MA
0"W
4" G
46
AS G IN 3.0 2.0 CLINTON STREET
MAI AP 602 G ' '
N P GM 48" REALTY HOLDINGS
W ROX W WA T.A.# 124.00-2-7
.4'
OH 13"
'5
IM L
AT 1.0 L 22
30
EL ' .5' 2574 CLINTON STREET
45
G OC 28" STUMP LIBER 11299 PAGE 9093
AT
IO
N6 2' HIGH AREA = 0.265 ACRES
.1'
9°
1.8 L
L
NYSEG "W 603
16
WA
'
AT G
S2
40
W ER M
SURVEY NOTES
602
W
AIN 34"
G OH
COVERED
12" 01
STOOP 6 1. TOPOGRAPHY SHOWN FROM A FIELD SURVEY BY COSTICH ENGINEERING
ON 12/8/2023 HORIZONTAL AND VERTICAL DATA OBTAINED THROUGH
G
604
MB G6
0 3
N60° 14' 10"W NYSDOT CORS NETWORK REFERENCED TO THE FOLLOWING MONUMENT
W W
G
AP
PR
88.00'
OX
G IM HAMBURG CORS STATION
AT
EL -LATITUDE: 42-43-02.66326 (N) NAD 83 (CORS)
OC
AT -LONGITUDE: 078-50-47.27326 (W)
G IO
W W N2
"G
AS
-ELLIP HEIGHT: 212.494 METERS NAVD 88 (CORS)
MA
IN
G
W W
W W
SITE DATA CERTIFICATION
REFERENCES
1. EXISTING ZONING: M-1 (MANUFACTURING DISTRICT) WE, COSTICH ENGINEERING, D.P.C., HEREBY CERTIFY T0:
1. DEEDS AS SHOWN ON FILE AT THE ERIE COUNTY CLERK'S OFFICE.
2. BULK REQUIREMENTS:
2. MAP OF THE EBENEZER LANDS FILED IN THE ERIE COUNTY CLERK'S
REQUIRED
OFFICE UNDER COVER NO. 58.
MIN. LOT AREA (SF) 20.,000
3. NEW YORK STATE DEPARTMENT OF TRANSPORTATION ACQUISITION MAP,
MAX LOT COVERAGE N/A
CLINTON STREET, PART I, S.H. NO. 371, ERIE COUNTY, MAP NO. 44, PARCEL
NO. 37., FILED AT LIBER 9006 OF DEEDS, PAGE 213.
MIN. LOT WIDTH (FT) 100
4. MAP ENTITLED "BOUNDARY SURVEY OF 2544 CLINTON STREET",
FLOOD NOTE: MAX. BUILDING HEIGHT (FT) 40 THIS MAP WAS PREPARED FROM NOTES OF AN INSTRUMENT SURVEY COMPLETED ON
PREPARED BY NUSSBAUMER & CLARKE, INC., HAVING JOB NO 15J2-0079,
By graphic plotting only, this property is in Zone X & Zone AE of the Flood DRAWING NO. SB-2535, DATED 2/4/2015. DECEMBER 8, 2023 AND FROM THE REFERENCE(S) LISTED HEREON. NO SEARCH OF
MIN. FRONT YARD SETBACK (FT) 50 RECORDS, OTHER THAN THOSE REFERENCED, WAS MADE FOR EASEMENTS OR
Insurance Rate Map No. 36029C0331H Community Panel No. 360262, Town of
West Seneca, which bears an effective date of 6/7/2019 and Zone X & Zone AE 5. MAP ENTITLED "BOUNDARY SURVEY OF 2602 CLINTON STREET", ENCUMBRANCES AFFECTING THIS PARCEL.
MIN. SIDE YARD SETBACK (FT) 50
of the Flood Insurance Rate Map No. 36029C0332H Community Panel No. PREPARED BY NUSSBAUMER & CLARKE, INC., HAVING JOB NO 15J2-0080,
360262, Town of West Seneca, which bears an effective date of 6/7/2019, No DRAWING NO. SB-2534, DATED 2/4/2015.
field surveying was performed to determine this zone and an elevation certificate
may be needed to verify this determination or apply for a variance from the Federal
MIN. REAR YARD SETBACK (FT) 10
By:
PRELIMINARY Date:
Emergency Management Agency.
Daniel T. Hickok, N.Y.S. L.S., No. 050449
PROJECT MANAGER TITLE OF PROJECT
EXISTING UTILITIES (LOCATION, SIZES AND INVERTS) SHOWN ON THE
PLANS ARE APPROXIMATE AND ARE NOT CERTIFIED AS TO THE
COPYRIGHT © 2023
OF NEW
D.T.H. Civil 2544 & 2574 CLINTON STREET PROPERTIES
COSTICH ENGINEERING, D.P.C. Y
TE WEST SENECA
ACCURACY OF THEIR LOCATION OR COMPLETENESS. THE DRAWN BY
GRAPHIC SCALE L T. H I Engineering
O OK
CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT IE K.E.L.
A
TITLE OF DRAWING
RK
C
ST
N
K
LOCATIONS AND DEPTHS OF ALL UTILITIES AND STRUCTURES IN THE IT IS A VIOLATION OF LAW FOR ANY Land EXISTING FEATURES
DA
50 0 25 50 100 200 BOUNDARY
PERSON, UNLESS ACTING UNDER THE
PATH OF, OR CLOSELY PARALLEL TO, OR UNDER, THE PROPOSED DIRECTION OF A LICENSED PROFESSIONAL G.M.S. Surveying
CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ENGINEER, LAND SURVEYOR, ARCHITECT
OR LANDSCAPE ARCHITECT, TO ALTER ANY TOPO/BASE LOCATION OF PROJECT TAX PARCEL NO.'S 124.00-2-5 & 124.00-2-7
DELAYS OR DAMAGES OCCURRING AS A RESULT OF INCORRECTLY Landscape
ITEM ON THIS DOCUMENT IN ANY WAY . M.G. PART OF LOTS 1,2, & 34 OF THE EBENEZER LANDS,
LOCATED UTILITIES. IT IS THE CONTRACTORS RESPONSIBILITY TO
R
ANY LICENSEE WHO ALTERS THIS Architecture LOT 123, TOWNSHIP 10, RANGE 7, BUFFALO CREEK RESERVATION,
LI C
NOTIFY THE VARIOUS UTILITY OWNERS IN AMPLE TIME FOR THEM TO ( IN FEET ) L.
YO
DOCUMENT IS REQUIRED BY LAW TO AFFIX S. DATE TOWN OF WEST SENECA, COUNTY OF ERIE, STATE OF NEW YORK
9
4
1 inch = 50 ft. NO. 0 5 0 4
EN
LOCATE AND MARK THEIR FACILITIES. THE CONTRACTOR SHALL ALSO HIS/HER SEAL AND THE NOTATION 12/18/2023
E
"ALTERED BY", FOLLOWED BY HIS/HER S V Costich CLIENT
LABELLA ASSOCIATES DWG. # 9263
NOTIFY UNDERGROUND UTILITY LOCATION SERVICE AT LEAST 48 ED R 217 Lake Avenue
SU
HOURS IN ADVANCE OF COMMENCING ANY WORK.
NO. DATE REVISION BY CHKD. APVLS.
SIGNATURE AND SPECIFIC DESCRIPTION OF
THE ALTERATION, TO THE DOCUMENT. L AND SCALE
1"=50' Engineering
Rochester, NY 14608
(585) 458-3020
300 STATE STREET - SUITE 201
ROCHESTER, NEW YORK 14614
VA100
SHEET 1 OF 1
Page 402 of 1493
Page 403
Prepared For:
Home Leasing, LLC
75 South Clinton Avenue, Suite 700
Rochester, NY 14604
Submitted by:
LaBella Associates
300 State Street, Suite 201
Rochester, NY 14614
(716) 551-6281
ENGINEERING REPORT FOR WEST SENECA
Date: October 2024
Last Revised: April 2026
LBA Project No. 2241067
Page 403 of 1493
Page 404
West Seneca Sewer Report | Page 1
Table of Contents
Section 1 – Introduction .................................................................................................................... 2
Section 2 – General.............................................................................................................................. 2
Section 3 – Proposed Sanitary Facilities .............................................................................. 2
Section 4 – Propsoed Stormwater Facilities ..................................................................... 6
Section 5 – Proposed Water Facilities ................................................................................... 9
Appendices
Attachment A – Site Location Map
Page 404 of 1493
Page 405
West Seneca Sewer Report | Page 2
Section 1 – Introduction
Home Leasing is proposing the development of a new affordable housing complex on a +/-
12.7-acre parcel in West Seneca, NY. Home Leasing is also seeking Site Plan Approval from
West Seneca and HCR 9% funding from New York State. The proposed development
includes 75 units split between a repurposing of the existing mansion on site to and a new 3-
story apartment building in the rear of the property. The project includes a private road
accessing the apartments, parking, sidewalks, playground, landscaping and stormwater
management facilities.
1.1 Site Location
The 12.7-acre site is nestled between Clinton Street (State Route 354) to the south and Cayuga
Creek to the North and West. Within a quarter mile of the development there are multiple
commercial uses and Interstate 90. The neighborhood is predominately comprised of
agricultural land, single- and two-family homes and industrial/manufacturing facilities. See
appendix A for location site map.
Section 2 – General
2.1 Existing Site Conditions
The existing site includes the above-mentioned mansion, two barns, a stone wall along
Clinton Street and parking areas. The barns and parking areas will be demolished, while the
existing stone wall will remain, with the entrance being widened to allow for emergency
vehicle access to the site.
The site topography is relatively flat with elevations generally ranging from 600 to 580. Storm
water runoff from site drains either via sheet flow directly to Cayuga Street, or to drainage
inlets that drain to Cayuga Creek. The existing drainage system on site is minimal and consists
of a small swale and dry detention basis which collects and re-directs off-site drainage from
the east. Drainage is then conveyed to Cayuga Creek via storm pipes and open drainage
swales.
2.2 Proposed Site Conditions
The proposed development includes 75 units split between a repurposing of the existing
mansion on site to now include apartments and one apartment building in the rear of the
property.
Project Data:
Facility Type: Affordable Housing
No. of Buildings: 2 (Including one existing)
Section 3 – Proposed Sanitary Facilities
3.1 Building Utility Services – Sanitary
The following summarizes the sanitary sewer service sizes for each building.
Page 405 of 1493
Page 406
West Seneca Sewer Report | Page 3
Table 1: Sanitary Lateral Sizes
Sanitary Lateral
Building # Description
Size
1 Existing Mansion 6”
2 Proposed Building 6”
3.2 Sanitary Sewer
The project requires a Down Stream Sewer Capacity analysis (DSCA) to conform with
NYSDEC regulations considering proposed sanitary flows are intended to convey a flow
greater than 2,500 gallons per day.
In accordance with Erie County policy a downstream, dry weather sanitary capacity analysis
is included. The monitoring report is included in the appendices.
Based on the flow depth measurements recorded the following conclusions are reached:
• At no time did the flow depth exceed pipe diameter at any of the downstream
monitoring points during the wet weather events monitored.
• One time during the monitoring period the depth of flow exceeded the diameter of
the pipe.
3.3 DSCA Summary
Erie County provided three (3) nodes, described below:
• Flow Monitoring Period: August 13, 2024, to September 18, 2024
• Dry Week Days Monitored: Aug 13-15, Aug 20-23, Aug 26-30, Sept 2-5, Sept 10-13,
and Sept 16-18.
• Dry Weekend Days Monitored: Aug 24-25, Sept 8, and Sept 14-15.
Nodes (manholes):
• Node 1 MH BAA8A – 48” RCP (Matthews Cemetery NW Corner)
• Node 2 MH BAA9A – 60” RCP (Casimer Street)
• Node 3 MH BAAA8 – 66” RCP (8 Cable Street)
Design Parameters:
Hydraulic Loading rates per NYS Design Standards for Intermediate Wastewater Treatment
Systems, March 5, 2014. Calculations included below:
Apartments – Bedroom Units = 110 gpd/unit
Office Space= 15 gpd / employee
Average Daily Design Flow:
One Bdrm Units:(24 units) x (1 bdrm/unit)x 110gpd/bdrm=2,640 gpd
Two Bdrm Units:(29 units) x (2 bdrm/unit)x110gpd/bdrm=6,380 gpd
Page 406 of 1493
Page 407
West Seneca Sewer Report | Page 4
Three Bdrm Units:(22 units) x (3 bdrm/unit)x110gpd/bdrm=7,260 gpd
Office Space: 4 Employees x 15 gpd = 60 gpd
Total = 16,340 gpd
Peak Hourly Flow (Sanitary): 16,340 gpd x Peak Factor
Total Population=[(24x1)+(29x2)+(22x3)]x2 people per bedroom=
=148x2= 296People (assume 2 people per bedroom)+4 office employees=300. P = 0.300 (in
thousands)
Peaking Factor = (18 + √P) / (4+√P) = (18+0.548)/(4+0.548)=4.08
Peak Sanitary Demand =16,340x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Sanitary Demand Calculations:
Node 1 – Average 16,340 gpd (0.016 MGD)
Entire Site:
110-gal/d/unit x 1bdrmx24 units=2,640 gpd
+ 110-gal/d/unit x 2bdrmx29 units=6,380 gpd
+110-gal/d/unitx3bdrmx22 units=7,260 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,340 gpd
Ave. Total = 16,340 gpd (0.016 MGD)
Assume 2 people per bedroom. 2 x 148 bedrooms = 296 people + 4 office employees = 300
people. P = 0.300 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,340 x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Node 2 – Average 16,340 gpd (0.016 MGD)
Entire Site:
110-gal/d/unit x 1bdrmx24 units=2,640 gpd
+ 110-gal/d/unit x 2bdrmx29 units=6,380 gpd
+110-gal/d/unitx3bdrmx22 units=7,260 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,340 gpd
Ave. Total = 16,340 gpd (0.016 MGD)
Assume 2 people per bedroom. 2 x 148 bedrooms = 296 people + 4 office employees = 300
people. P = 0.300 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,340 x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Node 3 – Average 16,340 gpd (0.016 MGD)
Page 407 of 1493
Page 408
West Seneca Sewer Report | Page 5
Entire Site:
110-gal/d/unit x 1bdrmx24 units=2,640 gpd
+ 110-gal/d/unit x 2bdrmx29 units=6,380 gpd
+110-gal/d/unitx3bdrmx22 units=7,260 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,340 gpd
Ave. Total = 16,340 gpd (0.017 MGD)
Assume 2 people per bedroom. 2 x 148 bedrooms = 296 people + 4 office employees = 300
people. P = 0.300 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,340 x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Table 2: Dry Weather Peak Weekday
Proposed
Total
Existing Peak Theoretical
Ave. Daily Peak Available Capacity
Node Sewer Peak Flow Sanitary Capacity
Flow (mgd) Flow (Y/N)
(mgd) Flow (mgd)
(mgd)
(mgd)
1-MH 48” RCP @ 0.41%
BAA8A (Matthews
0.016 7.953* 0.067 8.020 59.6 Y
Cemetery NW
Corner)
2-MH 60” RCP @ 0.042%
0.016 11.619** 0.067 11.686 34.6 Y
BAA9A (Casimer Street)
3-MH 66” RCP @ 0.026%
BAAA8 0.016 10.614*** 0.067 10.614 35.1 Y
(8 Cable Street)
Notes:
*Peak Dry Week Day for Nodes 1 on Aug 27,2024
**Peak Dry Week Day for Node 2 on Aug 21,2024
***Peak Dry Week Day for Node 3 on Aug 21,2024
Table 3: Dry Weather Peak Weekend Day
Proposed
Total
Ave. Daily Existing Peak Theoretical
Peak Available Capacity
Node Sewer Flow Peak Flow Sanitary Capacity
Flow (Y/N)
(mgd) (mgd) Flow (mgd)
(mgd)
(mgd)
1-MH 48” RCP @ 0.41%
BAA8A (Matthews
0.016 6.070* 0.067 6.137 59.6 Y
Cemetery NW
Corner)
Page 408 of 1493
Page 409
West Seneca Sewer Report | Page 6
2-MH 60” RCP @ 0.042%
BAA9A 0.016 11.972** 0.067 12.039 34.6 Y
(Casimer Street)
3-MH 66” RCP @ 0.026%
BAAA8 0.016 11.615*** 0.067 11.682 35.1 Y
(8 Cable Street)
Notes:
*Peak Dry Weekend Day for Nodes 1 on Aug 25,2024
**Peak Dry Weekend Day for Node 2 on Sept 14,2024
***Peak Dry Weekend Day for Node 3 on Sept 14,2024
3.5 DSCA CONCLUSION
Based on the analysis and flow monitoring results the flow depth peak increases are
described below. The combined sewer has sufficient capacity to handle projected peak
flows.
• Node 1 projected peak 0.067 MGD flow (0.10 CFS) result in approximately a 1.6 inch
water level increase within the 48” RCP sewer.
• Node 2 projected peak 0.067 MGD flow (0.10 CFS) result in approximately 2.6 inch
water level increase within the 60” RCP sewer.
• Node 3 projected peak 0.067 MGD flow (0.10 CFS) result in approximately 2.9 inch
water level increase within the 66” RCP sewer.
Full sewer calculations including – TECsmith Flow Monitoring Data, TECsmith Time Tables,
Eire County Flow Monitoring and Erie County Time Tables are included in the Full Sewer
Report which was previously provided to the town as a part of the Special Use Permit review
process.
Section 4 – Proposed Stormwater Facilities
4.1 Proposed Stormwater Loading
A Stormwater Pollution Prevention Plan (SWPPP) has been developed as part of this project
and is included under a separate cover. The proposed on-site storm system will outlet to
Cayuga Creek. The stormwater design meets the Town of West Seneca Town Code (2025-
09-08) - Chapter 102A Stormwater Management and Erosion and Sediment Control and the
NYSDEC 2024 Stormwater Design Manual Regulations. However, pertinent information
pertaining to existing and proposed stormwater loading has been included for analysis in the
table below.
4.2 Required WQv
Stormwater runoff from impervious surfaces is recognized as a significant contributor of
pollution that can adversely affect the quality of receiving water bodies. Therefore, treatment
of stormwater runoff is important since most runoff related water quality contaminants are
Page 409 of 1493
Page 410
West Seneca Sewer Report | Page 7
transported from land, particularly the impervious surfaces, during the initial stages of storm
events.
The Design Manual requires that water quality treatment be provided for the initial flush of
runoff from every storm. The NYSDEC refers to the amount of runoff to be treated as the
“Water Quality Volume” (WQv). Section 4.2 of the Design Manual defines the Water Quality
Volume as follows:
WQv = [(P )(R V )(A )]
12
Where: P = 90% Rainfall Event Number
Rv = 0.05 + 0.009 (I)
I = Impervious Cover (Percent)
A = Contributing Area in Acres
This definition ensures that, all other things being equal, the Water Quality Volume will
increase along with the impervious cover percentage. This redevelopment project is
proposing a combination of WQv treatment by standard practice(s) and alternative practice(s)
as shown in the following tables:
Table 4: Required WQv Summary
P (inches) A (Ac) I (Ac) Rv WQv Required (cf)
1.00 5.68 2.98 0.29 8,672
4.3 RRv Requirements
Land use change and development in the watershed increases the volume of runoff. As such,
reductions in the amount of runoff from new development, accomplished through the
implementation of a stormwater management plan for the site, will play an important role in
the success or failure of the watershed-wide stormwater management plan. Runoff reduction
techniques can be applied to manage, reduce, and treat stormwater, while maintaining and
restoring natural hydrology through infiltration, evapo-transpiration, and the capture and
reuse of stormwater. Volume reduction techniques by themselves typically are not sufficient
to provide adequate attenuation of stormwater runoff, but they can decrease the size of the
peak runoff rate reduction facilities.
Section 9.2.1.B of the 2024 NYSDEC Design Manual indicates, “Although encouraged, meeting
the RRv criteria is not required for the redevelopment activity portion of a project. The need
to provide RRv shall be considered separately for each design point. For design points with a
net increase in impervious area, RRv is required for the increase in impervious area only.”
As such, bioretentions and a water quality unit have been applied to the project to meet the
WQv objective for the redevelopment activity of the project. The increase in impervious cover
will be treated as new development and both the WQv criteria and RRv criteria are met. The
table below indicates the required RRv for the site.
Page 410 of 1493
Page 411
West Seneca Sewer Report | Page 8
Table 5: Required RRv
Total Minimum
Soil Soil Soil Soil
Increase in Weighted RRv
Group A Group B Group C Group D Rv
Impervious S Factor Required
(%) (%) (%) (%)
Area (Ac) (cf)
1.92 0 0 0 100 0.95 0.20 1,324
4.4 Provided WQv and RRv
The following table summarizes both the water quality volume and reduced runoff volume
provided by each practice:
Stormwater Practice WQv Treated (cf) RRv Provided (cf)
Bioretention (3 total areas) 3,338 1,337
Water Quality Unit 6,627 0
Total 9,965 1,337
Based on the above table, the WQv and RRv requirements are being met.
4.5 Discharge Rates
A comparison of the pre- and post-development watershed conditions was performed for all
Design Points and storm events evaluated. For all Design Points and design storms, this
comparison demonstrates that the peak rate of runoff will not be increased. Therefore, the
project will not have a significant adverse impact on the adjacent or downstream properties
or receiving water courses.
The results of the computer modeling used to analyze the pre- and post-development
watersheds are presented in the following table below:
Table 6: Summary of Pre-Development and Post-Development Peak Discharge Rates
10-year 24-hour storm event 100-year 24-hour storm event
Analysis Point
(AP)
Pre Post Pre Post
1 16.3 13.9 36.8 31.7
Based on the table above, the proposed stormwater flows have been reduced for all storm
events to below pre-development conditions.
A full stormwater pollution prevention plan per NYS Stormwater Design Manual, NYSDEC
SPDES General Permit for Stormwater Discharge from Construction Activity and NYSDEC
Page 411 of 1493
Page 412
West Seneca Sewer Report | Page 9
Standards and Specifications for Erosion and Sediment Control has been prepared for this
project. The SWPPP is included in the Site Plan Application Package.
Section 5 – Proposed Water Facilities
5.1 Proposed Water Connections
The project is proposing a new water connection to the Eire County Water Authority (EWCA)
12” water main on the north side of Clinton Street.
5.2 Existing Flow Test Data
Existing hydrant flow test data was provided for hydrant J11F55 and completed on 7/15/2019.
The existing water line is a 6” cast iron pipe on the south side of Clinton Street. The residual
pressure was 54 psi at 872 gpm.
5.3 Proposed Water Demand
The anticipated average daily water demand from the proposed development was
calculated using Table B-3 of the NYSDEC Design Standards for Intermediate Sized
Wastewater Treatment Systems, dated March 5, 2014. For apartments constructed after
1994, the average daily water demand per bedroom is 110-gallons per day. The proposed
project includes updating all water fixtures to modern energy efficient fixtures. Based on
this, the anticipated average daily water demand for the proposed development is as
follows:
Table 7: Anticipated Water Demand
Average Daily Demand
No. of Bedrooms No. of Units Water Demand Per Unit (GPD)
(GPD)
1 Bedroom 24 110 2,640
2 Bedroom 29 220 6,380
3 Bedroom 22 330 7,260
Total Average Daily Demand 16,340
Maximum Day (2x Average Daily) 32,680
Peak Hourly (4x Average Daily) 35,360
5.4 Proposed Fire Protection and Backflow
The project is proposing one combined service from Clinton Street, which will split into
combined services feeding the existing mansion and new building respectively. New
backflow prevention devices are proposed for each of the buildings, splitting into separate
domestic and fire services after the backflows. The domestic services will be metered within
each building. The private hydrants on site will be fed after the backflow within each building.
Refer to the MEP and FP plans for detailed design.
Page 412 of 1493
Page 413
Stormwater Pollution Prevention Plan
Prepared for:
Home Leasing
75 South Clinton Avenue, Suite 700,
Rochester, NY 14604
Submitted by:
LaBella Associates
300 Pearl Street, Suite 130
Buffalo, NY 14202
(716) 551-6281
West Seneca Apartments
Town of West Seneca, Erie County, New York
Date: April 2026
Last revised: April 2026
Project No. 2241067
Page 413 of 1493
Page 414
Page 414 of 1493
Page 415
PREPARER OF THE SWPPP
“I certify under penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.”
Name and Title1: Kristopher Winkler, PE
Date: Issued: April 2026
1 This is a signature of a New York State licensed Professional Engineer employed by LaBella Associates that is duly
authorized to sign and seal Stormwater Pollution Prevention Plans (SWPPPs), NOIs, and NOTs prepared under their direct
supervision. Refer to Appendix B for the SWPPP Preparer Certification Form, and Appendix I for the LaBella Certifying
Professionals Letter.
Page 415 of 1493
Page 416
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY .................................................................................................................... 1
1.1 Project Description ................................................................................................................... 1
1.2 Stormwater Pollution Controls................................................................................................. 2
2.0 SITE CHARACTERISTICS .................................................................................................................. 3
2.1 State Environmental Quality Review ....................................................................................... 3
2.2 Land Use and Topography ....................................................................................................... 3
2.3 Soils and Groundwater............................................................................................................. 3
2.4 Watershed Designation ........................................................................................................... 4
2.5 Receiving Water Bodies ........................................................................................................... 4
2.6 Aquifer Designation .................................................................................................................. 4
2.7 Wetlands ................................................................................................................................... 4
2.8 Flood Plains .............................................................................................................................. 4
2.9 Listed, Endangered, or Threatened Species .......................................................................... 5
2.10 Historic Places ........................................................................................................................ 5
2.11 Rainfall Data........................................................................................................................... 5
2.12 Pre-development Watershed Conditions .............................................................................. 5
2.13 Post-development Watershed Conditions ............................................................................ 6
2.14 Description of Design Points ................................................................................................. 6
3.0 STORMWATER MANAGEMENT PLANNING .................................................................................... 6
3.1 STEP 1 – Site Planning ............................................................................................................ 7
3.2 STEP 2 – Calculate Water Quality Treatment Volume (WQv) ................................................ 7
3.3 STEP 3 – Apply RR Techniques and Standard SMPs with RRv Capacity to Reduce
Total WQv......................................................................................................................................... 8
3.4 STEP 4 – Calculate the Minimum RRv Required.................................................................... 9
3.5 STEP 5 – Apply Standard SMPs to Address Remaining Water Quality Volume .................... 9
3.6 STEP 6 - Apply Volume and Peak Rate Control .................................................................... 11
3.7 Climate Change Consideration .............................................................................................. 13
4.0 CONSTRUCTION SEQUENCE ......................................................................................................... 14
5.0 CONSTRUCTION-PHASE POLLUTION CONTROL ........................................................................... 14
5.1 Temporary Erosion and Sediment Control Measures .......................................................... 15
5.2 Permanent Erosion and Sediment Control Measures ......................................................... 17
5.3 Implementation Schedule for Erosion and Sediment Control Measures ........................... 17
Page 416 of 1493
Page 417
5.4 Other Pollutant Controls......................................................................................................... 18
5.5 Construction Housekeeping Practices .................................................................................. 21
6.0 INSPECTIONS, MAINTENANCE, AND REPORTING ....................................................................... 22
6.1 Inspection and Maintenance Requirements ........................................................................ 22
6.2 Reporting Requirements ........................................................................................................ 24
7.0 SWPPP IMPLEMENTATION RESPONSIBILITIES ........................................................................... 26
7.1 Owner’s/Operator's Responsibilities..................................................................................... 26
7.2 Owner’s/Operator’s Engineer’s Responsibilities.................................................................. 29
7.3 Contractor's Responsibilities ................................................................................................. 30
7.4 Qualified Inspector’s/Qualified Professional’s Responsibilities ......................................... 31
7.5 SWPPP Participants ............................................................................................................... 33
LIST OF TABLES
Table 1: USDA Soil Data .............................................................................................................................. 3
Table 2: Project Site HSG Data ................................................................................................................... 3
Table 3: Rainfall Data .................................................................................................................................. 5
Table 4: Required WQv Treatment by Alternative Practice ....................................................................... 8
Table 5: WQv Required Summary ............................................................................................................... 8
Table 6: Summary of Standard SMPs with RRv Capacity being Applied .................................................. 9
Table 7: RRv Summary ................................................................................................................................ 9
Table 8: Summary of WQv Provided ......................................................................................................... 10
Table 9: Summary of Hydrodynamic Unit(s) ............................................................................................. 11
Table 10: Design Events ............................................................................................................................ 13
Table 11: CPv Summary ............................................................................................................................ 13
Table 12: Summary of Pre- and Post-Development Peak Discharge Rates ........................................... 13
Table 13: Implementation Schedule for Erosion and Sediment Control Measures .............................. 18
Table 14: Common Construction Pollutants ............................................................................................ 20
Page 417 of 1493
Page 418
APPENDICES
Appendix A: Figures
• A-1: Site Location Map
• A-2: Soils Map
• A-3: Historic Places Screening Map
• A-4: Environmental Resource Map
• A-5: FEMA Firm Map
• A-6: Pre-Development Watershed Delineation Map (Pocket)
• A-7: Post-Development Watershed Delineation Map (Pocket)
Appendix B: Forms
• Notice of Intent (NOI)
• MS4 SWPPP Acceptance Form
• SWPPP Preparer Certification Form
• Owner/Operator Certification Form
• Contractor and Subcontractor Certification Forms
• Notice of Termination (NOT)
Appendix C: Project Evaluation and Design Calculations
Appendix D: Pre-Development Stormwater Modeling
Appendix E: Post-Development Stormwater Modeling
Appendix F: SWPPP Inspection Report (Sample Form)
Appendix G: Post-Construction Inspections and Maintenance
Appendix H: NYSDEC “Deep-Ripping and Decompaction,” April 2008
Appendix I: LaBella Certifying Professionals Letter
Appendix J: NYSDEC SPDES General Permit GP-0-25-001
Page 418 of 1493
Page 419
1.0 EXECUTIVE SUMMARY
This Stormwater Pollution Prevention Plan (SWPPP) has been prepared for major activities associated
with construction of a 75-unit affordable housing complex and related site work in the Town of West
Seneca. This SWPPP includes the elements necessary to comply with the national baseline general
permit for construction activities enacted by the U.S. Environmental Protection Agency (EPA) under the
National Pollutant Discharge Elimination System (NPDES) program and all local governing agency
requirements. This SWPPP must be executed, and permit coverage must be obtained prior to the
commencement of construction activity.
This SWPPP has been developed in accordance with the “New York State Department of Environmental
Conservation (NYSDEC) State Pollutant Discharge Elimination System (SPDES) General Permit for
Stormwater Discharges from Construction Activity,” Permit No. GP-0-25-001, effective January 29,
2025 through January 28, 2030. The SWPPP and accompanying plans identify and detail stormwater
management, pollution prevention, and erosion and sediment control measures necessary during and
following completion of construction.
This SWPPP and the accompanying plans entitled “West Seneca Apartments” have been submitted as
a set. These engineering drawings are considered an integral part of this SWPPP. Therefore, this
SWPPP is not considered complete without them. References made herein to “the plans” or to a
specific “sheet” refer to these drawings.
This report considers the impacts associated with the intended development with the purpose of:
1. Maintaining existing drainage patterns as much as possible while continuing the conveyance
of upland watershed runoff;
2. Controlling increases in the rate of stormwater runoff resulting from the proposed development
so as not to adversely alter downstream conditions; and
3. Mitigating potential stormwater quality impacts and preventing soil erosion and sedimentation
resulting from stormwater runoff generated both during and after construction.
The analysis and design completed and documented in this report is intended to be part of the
application made for a multi-family residential redevelopment project with an increase in impervious
area completed on behalf of the Owner/Operator.
1.1 Project Description
Home Leasing is proposing redevelopment project with an increase in impervious area, to include: 75-
unit affordable housing building, associated parking, sidewalks, and landscaping. The total project
area of disturbance proposed is 5.7 acres. The project will disturb one (1) or more acres and as
such, preparation of this SWPPP is required under GP-0-25-001. A Site Location Map has been
provided in Appendix A, as Figure A-1.
This type of project is included in Table 2 of Appendix B of GP-0-25-001; and the project site is not
located in one of the watersheds listed in Appendix C of GP-0-25-001. Therefore, this SWPPP includes
post-construction stormwater management practices, as well as erosion and sediment controls.
project is located within the Town Of West Seneca regulated, traditional land use control Municipal
Separate Stormwater Sewer System (MS4). Therefore, an MS4 SWPPP Acceptance Form is required
to accompany NOIs submitted to the NYSDEC.
Stormwater Pollution Prevention Plan
Page 1
2241067
Page 419 of 1493
Page 420
Runoff from the project site will discharge to the Cayuga Creek, which is not included in the list of
Section 303(d) water bodies included in Appendix D of GP-0-25-001.
Project construction activities will consist primarily of site grading, paving, building construction, and
the installation of storm drainage, water supply, sanitary sewer, and public utility infrastructure
necessary to support the proposed redevelopment project with an increase in impervious area.
Construction phase pollutant sources anticipated at the site are disturbed (exposed) soil, vehicle fuels
and lubricants, chemicals associated with building construction, and building materials. Without
adequate control there is the potential for each type of pollutant to be transported by stormwater.
1.2 Stormwater Pollution Controls
The stormwater pollution controls outlined herein have been designed and evaluated in accordance
with the following standards and guidelines:
• New York State Stormwater Management Design Manual, dated July 31, 2024 (Design
Manual).
• New York State Standards and Specifications for Erosion and Sediment Control, dated
November 2016 (SSESC).
• Town of West Seneca Town Code (2025-09-08) - Chapter 102A Stormwater Management and
Erosion and Sediment Control
Stormwater quality will be enhanced through the implementation of temporary and permanent erosion
and sediment control measures, the proposed stormwater management practice(s), and other
construction-phase pollution controls outlined herein.
The proposed stormwater management approach consisting of pipes, open drainage ways, and on-
site stormwater management practices will adequately collect, treat, and convey the stormwater
runoff.
Bioretentions and a water quality unit will be used to manage and treat stormwater runoff generated
by the proposed redevelopment project with an increase in impervious area.
Pre- and post-development surface runoff rates have been evaluated for the 1-, 10-, and 100-year 24-
hour storm events. Comparison of pre- and post-development watershed conditions demonstrates that
the peak rate of runoff from the project site will not be increased.
The pollutant loading analysis indicates stormwater quality will be enhanced through the
implementation of the proposed stormwater management practices outlined herein.
The post-construction stormwater management practice(s) will be privately owned by Home Leasing.
Deed restrictions will be in place, which require operation and maintenance of the practice(s) in
accordance with the operation and maintenance plan.
Stormwater Pollution Prevention Plan
Page 2
2241067
Page 420 of 1493
Page 421
2.0 SITE CHARACTERISTICS
2.1 State Environmental Quality Review
The construction activity is subject to State Environmental Quality Review (SEQR). The project is
considered a Unlisted action. As such, SEQR coordination has been completed. Negative Declaration
issued on 1/27/2025, amended on 2/9/2026. A copy of the SEQR documentation, in accordance
with Part I.A.5. of GP-0-25-001, is provided in Appendix A, as Figure A-5 upon receipt.
2.2 Land Use and Topography
The project site is located within the R-50 zoning district. Multiple-family dwellings is a permitted use
subject to a special use permit within this district. Special Use Permit was obtained on 2/9/2026.
The overall site is slightly sloping, with slopes ranging from 1 to 10 percent. Site elevations range from
approximately 580 feet above mean sea level (MSL) to 600 feet MSL. The site generally slopes to the
north and the west towards Cayuga Creek.
2.3 Soils and Groundwater
The US Department of Agriculture (USDA) Web Soil Survey (http://websoilsurvey.nrcs.usda.gov/app/)
was used to obtain surficial soil conditions for the study area, as follows:
Table 1: USDA Soil Data
Depth to Depth to
Hydrologic Erosion
Map Symbol & Description Water Table Bedrock
Soil Group Factor K
(feet) (feet)
Fu - Fluvaquents and Udifluvents, frequently
A/D 0.17 0.50 >6.0
flooded
GaA - Galen very fine sandy loam, 0 to 3
A/D 0.37 1.75 >6.0
percent slopes
GaB - Galen very fine sandy loam, 3 to 8
A/D 0.37 1.75 >6.0
percent slopes
Te – Teel silt loam B/D 0.37 1.75 >6.0
Upon review of the soil data presented in Table 1, the project site does not contain soils with a soil
slope phase of D with a map unit name that inclusive of slopes greater than 25%, and does not contain
soils with a soil slope phase of E or F.
The project site is composed of HSG A soils, HSG B soils, and HSG D soils, as shown in the table below.
For the purposes of this report, HSG X/D soils were modeled as HSG D soils to reflect the undrained
condition.
Table 2: Project Site HSG Data
HSG A HSG B HSG C HSG D
0% 0% 0% 100%
Stormwater Pollution Prevention Plan
Page 3
2241067
Page 421 of 1493
Page 422
The Soil Conservation Service defines the hydrologic soil groups as follows:
• Type A Soils: Soils having a high infiltration rate and low runoff potential when thoroughly wet.
These soils consist mainly of deep, well drained to excessively drained sands or gravelly sands.
These soils have a moderate rate of water transmission.
• Type B Soils: Soils having a moderate infiltration rate when thoroughly wet and consisting
mainly of moderately deep to deep, moderately well to well drained soils with moderately fine
to moderately course textures. These soils have a moderate rate of water transmission.
• Type D Soils: Soils having a very low infiltration rate and high runoff potential when thoroughly
wet. These soils consist chiefly of clays that have high shrink-swell potential, soils that have a
permanent high water table, soils that have a clay pan or clay layer at or near the surface, and
soils that are shallow over nearly impervious material. These soils have a very low rate of water
transmission.
The soils map for the study area is presented in Appendix A, as Figure A-2.
2.4 Watershed Designation
The project site is not located in a restricted watershed identified in Appendix C of GP-0-25-001.
2.5 Receiving Water Bodies
The nearest natural classified water course into which runoff from the project site will discharge is
Cayuga Creek. Cayuga Creek is classified by NYSDEC as a Class C water course, and is not included
in the Section 303(d) list of impaired waters found in Appendix D of GP-0-25-001.
2.6 Aquifer Designation
The project site is not located over a US EPA designated Sole Source aquifer; nor is it located over a
Primary or Principal aquifer listed in the NYSDEC Technical and Operational Guidance Series (TOGS)
2.1.3 (1980).
2.7 Wetlands
A search on the NYSDEC Environmental Resource Mapper on April 16, 2026, and a review of GIS
data, determined that there are no known regulated wetlands located on or in the vicinity of the project
site. A wetland delineation is scheduled for Spring 2026 to field verify if there are any wetland on site.
2.8 Flood Plains
According to the National Flood Insurance Program Flood Insurance Rate Map (FIRM), Town of West
Seneca, New York, Community, the project site lies within Flood Zone X, areas determined to be outside
500-year floodplain The FEMA Flood Map has been provided in Appendix A, as Figure A-5.
Stormwater Pollution Prevention Plan
Page 4
2241067
Page 422 of 1493
Page 423
2.9 Listed, Endangered, or Threatened Species
A search was performed on the NYSDEC Environmental Resource Mapper on April 16, 2026, and
determined that the project site may contain threatened or endangered species, or critical habitat.
An Environmental Resource Map has been provided in Appendix A, as Figure A-4.
2.10 Historic Places
A search on the New York State Cultural Resource Information System (CRIS) database, performed on
April 16, 2026, revealed the construction activity is located within an archeologically sensitive area A
printout of the historic places screening map is presented in Appendix A, as Figure A-3. As such,
NYSOPRHP coordination has been completed and a Phase 1 Archeological Survey was conducted on
June 22, 2023 by archeologist. A copy of the NYSOPRHP documentation, in accordance with Part I.A.4.
of GP-0-25-001, is provided in Appendix A, as Figure A-3A upon receipt.
2.11 Rainfall Data
Rainfall data utilized in the modeling and analysis was obtained from the Cornell University online
Extreme Precipitation in New York & New England website (http://precip.eas.cornell.edu/). A local IDF
file was imported, and specific mass curves were generated, in HydroCAD to evaluate the pre- and
post-development stormwater runoff characteristics. Rainfall data specific to the portion of Erie
County under consideration, for various 24-hour storm events, is presented in the following Table:
Table 3: Rainfall Data
Storm Event 24-Hour Rainfall
Return Period (inches)
1-year 1.82
10-year 3.14
100-year 5.22
2.12 Pre-development Watershed Conditions
The pre-development project site is covered predominantly by buildings, pavement, grass, and woods.
Analysis of pre-development conditions considered existing drainage patterns, soil types, ground
cover, and topography. The Pre-Development Watershed Delineation Map has been provided in
Appendix A, as Figure A-5.
The results of the computer modeling used to analyze the overall watershed under pre-development
conditions are presented in Appendix D. A summary of the pre-development watershed runoff rates at
each Design Point is presented in Table 10.
Subcatchment one is a 3.38± acre watershed consisting of grass and pavement. Runoff flows south
overland via sheet and shallow concentrated flow toward a swale and catch basin at the southeast
corner of the site. This subcatchment is tributary to Design Point (AP) 1.
Subcatchment two is a 7.74± acre watershed consisting of grass, pavement, and multiple buildings.
Runoff flows west overland via sheet and shallow concentrated flow toward Cayuga Creek west of the
site. This subcatchment is tributary to Design Point (AP) 1.
Stormwater Pollution Prevention Plan
Page 5
2241067
Page 423 of 1493
Page 424
2.13 Post-development Watershed Conditions
The post-development project site is covered predominantly by buildings, pavement, sidewalks, grass,
and woods. The analysis of post-development conditions considered existing drainage patterns, soil
types, ground cover to remain, planned site development, site grading, and stormwater management
facilities proposed as part of site improvements. The Post-Development Watershed Delineation Map
has been provided in Appendix A, as Figure A-6.
The results of the computer modeling used to analyze the overall watershed under post-development
conditions are presented in Appendix D. A summary of the post-development watershed runoff rates
at each Design Point is presented in Table 11.
There are numerous locations and methods for providing controls of off-site discharge of stormwater
from the project site. Each has been designed to provide the above quantity controls by attenuating
stormwater runoff and releasing runoff to off-site locations at a rate equal to or less than that which
existed prior to development of the site. Each device is detailed on the accompanying plans. A Post-
Development Watershed Delineation Map, with the tributary areas to each stormwater management
practice proposed, has been provided in Appendix A, as Figure A-6.
2.14 Description of Design Points
The study area consists of the 11.2 acre project site and 5.7 acre area of disturbance. The overall
watershed was broken down into smaller watersheds, or subcatchments, to allow for analysis of runoff
conditions at several locations throughout the study area. Each of these locations was defined as a
Design Point (DP) in order to compare the effects resulting from stormwater management facilities
proposed as part of the project. Descriptions of each of the selected Design Points are provided below.
• Design Point 1: Off-site discharge to Cayuga Creek
3.0 STORMWATER MANAGEMENT PLANNING
Chapter 3 of the Design Manual outlines a six-step planning process for site planning and selection of
stormwater management practices that must be implemented for both new development and
redevelopment projects. This process is intended to develop a design that maintains pre-construction
hydrologic conditions through the application of environmentally sound development principles, as
well as treatment and control of runoff discharges from the site. The following sections outline the
step-by-step process and how it has been applied to this project.
The goals of this Stormwater Management Plan are to analyze the peak rate of runoff under pre- and
post-development conditions, to maintain the pre-development rate of runoff in order to minimize
impacts to adjacent or downstream properties, and to minimize the impact to the quality of runoff
exiting the site.
The Design Manual provides both water quality and water quantity objectives to be met by projects
requiring a “Full SWPPP”. These objectives will be met by applying stormwater control practices to limit
peak runoff rates and improve the quality of runoff leaving the developed site.
Stormwater Pollution Prevention Plan
Page 6
2241067
Page 424 of 1493
Page 425
3.1 STEP 1 – Site Planning
During the Site Planning process, the project site is evaluated for implementation of the green
infrastructure planning measures identified in Table 3.1 of the Design Manual, in order to preserve
natural resources and reduce impervious cover. Appendix C provides a description of each green
infrastructure planning measure, along with a project specific evaluation.
3.2 STEP 2 – Calculate Water Quality Treatment Volume (WQv)
Stormwater runoff from impervious surfaces is recognized as a significant contributor of pollution that
can adversely affect the quality of receiving water bodies. Therefore, treatment of stormwater runoff
is important since most runoff related water quality contaminants are transported from land,
particularly the impervious surfaces, during the initial stages of storm events.
3.2.1 NYSDEC Requirements for Water Quality Volume
The Design Manual requires that water quality treatment be provided for the initial flush of runoff from
every storm. The NYSDEC refers to the amount of runoff to be treated as the “Water Quality Volume”
(WQv). Section 4.2 of the Design Manual defines the Water Quality Volume as follows:
WQv = (P)(R V )(A)
12
Where: P = 90% Rainfall Event Number
Rv = 0.05 + 0.009 (I)
I = Impervious Cover (Percent)
A = Contributing Area in Acres
This definition ensures that, all other things being equal, the Water Quality Volume will increase along
with the impervious cover percentage.
3.2.2 Methodology for Redevelopment Projects
Chapter 9 of the Design Manual outlines alternative WQv treatment objectives for redevelopment
projects.
According to Section 9.2.1.B.IV, redevelopment activities can achieve the water quality treatment
objective through a combination of impervious cover reduction, standard SMPs, and alternative SMPs
that provide a weighted average of at least two of the above methods, calculated as shown below. In
this case, 100% of any new increase in impervious area to a given design point must be treated by
approved alternate SMPs, standard SMPs, or RR techniques.
%ALT = [25-(% ICRED+ %SMP+ %RR)] x 3
Where:
%ALT = Percent of redevelopment impervious area treated by alternative SMP(s)
%ICRED = Percent reduction in existing disturbed impervious area
%SMP = Percent of redevelopment impervious area treated by standard SMP(s)
%RR = Percent of redevelopment impervious area treated by runoff reduction techniques(s)
Stormwater Pollution Prevention Plan
Page 7
2241067
Page 425 of 1493
Page 426
This redevelopment project is proposing a combination of WQv treatment by standard practice(s) and
alternative practice(s) as shown in the following tables:
Table 4: Required WQv Treatment by Alternative Practice
WQv Treatment by Impervious Cover WQv Treatment by Runoff Reduction
Alternative Practice Reduction (IC) Standard Practice
% Area (ac) % Area (ac) % Area (ac) % Area (ac)
38 2.13 0 0 34 1.96 0 0
Table 5: WQv Required Summary
P (inches) A (ac) I (ac) Rv WQv Required
1.00 5.68 2.98 0.29 8,672 cf 0.20 AF
The Water Quality Volume equation has been applied to the drainage area tributary to each of the
stormwater quality practices proposed for this project. The practices have been sized to accommodate
the Water Quality Volume, as per the performance criteria presented in Chapter 6 and/or Chapter 9 of
the Design Manual. Water quality volume calculations for each of the proposed practices are
presented in Appendix C.
3.3 STEP 3 – Apply RR Techniques and Standard SMPs with RRv Capacity to Reduce Total
WQv
Land use change and development in the watershed increases the volume of runoff. As such,
reductions in the amount of runoff from new development, accomplished through the implementation
of a stormwater management plan for the site, will play an important role in the success or failure of
the watershed-wide stormwater management plan. Runoff reduction techniques can be applied to
manage, reduce, and treat stormwater, while maintaining and restoring natural hydrology through
infiltration, evapo-transpiration, and the capture and reuse of stormwater. Volume reduction
techniques by themselves typically are not sufficient to provide adequate attenuation of stormwater
runoff, but they can decrease the size of the peak runoff rate reduction facilities.
3.3.1 NYSDEC Requirements for Redevelopment
Section 9.2.1.B of the Design Manual indicates, “Although encouraged, meeting the RRv criteria is not
required for the redevelopment activity portion of a project. The need to provide RRv shall be
considered separately for each design point. For design points with a net increase in impervious area,
RRv is required for the increase in impervious area only.”
As such, bioretentions and a water quality unit have been applied to the project to meet the WQv
objective for the redevelopment activity of the project. The increase in impervious cover will be treated
as new development and both the WQv criteria and RRv criteria are met.
3.3.2 Application of Standard Stormwater Management Practices (SMPs) with RRv Capacity
The following Table demonstrates a summary of the standard SMP(s) with RRv capacity that have been
incorporated into the stormwater management plan for this project. The standard SMP(s) with RRv
capacity have been designed in accordance with Chapter 6 of the Design Manual. Refer to the contract
drawings for practice dimensions, material specifications, and installation details. Practice specific
calculations are presented in Appendix C.
Stormwater Pollution Prevention Plan
Page 8
2241067
Page 426 of 1493
Page 427
Table 6: Summary of Standard SMPs with RRv Capacity being Applied
WQv
Pretreatment
Standard Pretreatment WQv Reduced WQv Total WQv
Design Volume RRv
SMP with Volume Required /RRv Treated1 Provided2
Variant Required Capacity
RRv Capacity Provided (CF) (CF) Provided (CF) (CF)
(% of WQv)
(CF)
Filtration
F-5 25 835 40% 8,672 1,337 2,001 3,338
Bioretention
Footnotes:
1WQv Treated = WQV Required - RRv Provided
2Total WQv Provided = WQV Treated + RRv Provided
3.3.3 RRv Performance Summary
A summary of the RRv provided is presented in the following table:
Table 7: RRv Summary
RRv Provided % RRv Provided/
WQv Required (CF)
WQv Reduced (CF) WQv Reduced
8,672 1,337 >100%
As indicated in the above table, the RRv provided is greater than the RRv required for the project site.
As such, the RRv criteria has been met and the designer can proceed to Step 6.
3.4 STEP 4 – Calculate the Minimum RRv Required
As indicated above, Section 9.2.1.B of the Design Manual indicates, “Although encouraged, meeting
the RRv criteria is not required for the redevelopment activity portion of a project.”
3.5 STEP 5 – Apply Standard SMPs to Address Remaining Water Quality Volume
If the entire Water Quality Volume is not treated through implementation of RR techniques and
standard SMPs with RRv capacity, then the design must achieve the remaining WQv through the
standard SMPs listed in Table 3.3 of the Design Manual or the Alternative Practices outlined in Section
9.4 of the Design Manual.
Stormwater Pollution Prevention Plan
Page 9
2241067
Page 427 of 1493
Page 428
Table 8: Summary of WQv Provided
Step 5
Step 3
Reduced WQv to be
Step 2 WQv Reduction by
Treated by Standard
WQv Required (CF) Standard SMPs w/ RRv
SMPs or Alternative
Capacity (CF)1
Practices (CF)2
8,672 3,338 6,627
Footnotes:
1Step 3: WQv Reduction = RRv Provided + WQv Treated by Standard SMP with RRv Capacity
2Step 5: Reduced WQv to be Treated = WQv Required – WQv Reduced
Based upon the results listed in the above Table, the entire WQv has not been treated by application
of RR techniques and standard SMPs with RRv capacity. As such, the standard SMPs or the Alternative
Practices (without RRv capacity) described in the following sections, have been incorporated into the
stormwater management plan for this project, to meet the WQv objective. Practice-specific calculations
are presented in Appendix C.
3.5.1 Underground Stormwater Detention System
Underground stormwater detention systems store and detain stormwater runoff in order to meet water
quantity control requirements. Stormwater is stored in subsurface vaults and/or a system of large
diameter interconnected storage pipes. Stored water is then released at rates designed to reduce
peak run-off flows during post-development storms. Underground stormwater storage provides
minimal stormwater quality benefits, but can be an effective component of a development’s overall
stormwater management plan.
3.5.2 Hydrodynamic Separators
Hydrodynamic separators accelerate the separation of floating and settling pollutants from stormwater
through the use of a vortex. These pre-fabricated devices come in the form of an underground manhole
or vault. The devices have no moving parts and are typically fabricated from concrete and marine grade
aluminum.
During operation, stormwater runoff enters the unit tangentially to promote a gentle swirling motion in
a treatment chamber. As stormwater circles within the chamber, settable solids fall into a sump and
are retained. Buoyant debris, oil, and grease rise to the surface and are separated from the water as
it flows under a baffle wall. Finally, treated water exits the treatment chamber through a flow control
orifice located behind the baffle wall.
During low-flow conditions all runoff is diverted into the treatment chamber by a flow partition. At higher
flow rates, a portion of the runoff spills over the flow partition and is diverted around the treatment
chamber to prevent re-suspension and washout of previously trapped pollutants. Water that spills over
the partition flows into a head equalization chamber above the treatment chamber outlet. As the head
equalization chamber fills, the head differential driving flow through the treatment chamber collapses.
The result is that flow rates in the treatment chamber remain relatively constant even as total flow
rates increase substantially. This configuration further reduces the potential for re-suspension or
washout.
Stormwater Pollution Prevention Plan
Page 10
2241067
Page 428 of 1493
Page 429
According to Chapter 9 of the Design Manual, hydrodynamic separators of the type proposed for this
project have been approved for use as a pretreatment system in new and redevelopment projects or
as a primary treatment system on redevelopment projects.
According to Chapter 9 of the Design Manual, membrane filtration, of the type proposed for this project,
has been approved for use as a primary treatment system on redevelopment projects.
The following Table summarizes both the Water Quality Volume requirements and the treatment
volumes provided.
Table 9: Summary of Hydrodynamic Unit(s)
SWM NYSDEC Required WQv Approved Manufactured Product Name
Required
Practice Design Flow Rate Treatment Flow Rate and
WQv (CF)
ID Variant (CFS) (MTFR) (CFS) Manufacturer
Contech
HYD-1 ALT 6,627 1.88 2.00
Cascade CS4
3.6 STEP 6 - Apply Volume and Peak Rate Control
This report presents the pre-development and post-development features and conditions associated
with the rate of surface water runoff within the study area. For both cases, the drainage patterns,
drainage structures, soil types, and ground cover types are considered in this study.
3.6.1 NYSDEC Requirements for New Development
Chapter 4 of the Design Manual requires that projects meet three separate stormwater quantity
criteria:
1. The Channel Protection (CPv) requirement is designed to protect stream channels from
erosion. This is accomplished by providing 24 hours of extended detention for the 1-year, 24-
hour storm event. The Manual defines the CPv detention time as the center of mass detention
time through each stormwater management practice.
2. The Overbank Flood Control (Qp) requirement is designed to prevent an increase in the
frequency and magnitude of flow events that exceed the bank-full capacity of a channel, and
therefore must spill over into the floodplain. This is accomplished by providing detention
storage to ensure that, at each Design Point, the post-development 10-year 24-hour peak
discharge rate does not exceed the corresponding pre-development rate.
3. The Extreme Flood Control (Qf) requirement is designed to prevent the increased risk of flood
damage from large storm events, to maintain the boundaries of the pre-development 100-year
floodplain, and to protect the physical integrity of stormwater management practices. This is
accomplished by providing detention storage to ensure that, at each Design Point, the post-
development 100-year 24-hour peak discharge rate does not exceed the corresponding pre-
development rate.
Stormwater Pollution Prevention Plan
Page 11
2241067
Page 429 of 1493
Page 430
3.6.2 Methodology
In order to demonstrate that the NYSDEC detention requirements are being met, the Design Manual
requires that a hydrologic and hydraulic analysis of the pre- and post-development conditions be
performed using the Natural Resources Conservation Service Technical Release 20 (TR-20) and
Technical Release 55 (TR-55) methodologies. HydroCAD, developed by HydroCAD Software Solutions
LLC of Tamworth, New Hampshire, is a Computer-Aided-Design (CAD) program for analyzing the
hydrologic and hydraulic characteristics of a given watershed and associated stormwater management
facilities. HydroCAD uses the TR-20 algorithms and TR-55 methods to create and route runoff
hydrographs.
HydroCAD has the capability of computing hydrographs (which represent discharge rates characteristic
of specified watershed conditions, precipitation, and geologic factors) combining hydrographs and
routing flows though pipes, streams and ponds. HydroCAD can also calculate the center of mass
detention time for various hydraulic features. Documentation for HydroCAD can be found on their
website: http://www.hydrocad.net/.
For this analysis, the watershed and drainage system was broken down into a network consisting of
three types of components as described below:
1. Subcatchment: A relatively homogeneous area of land, which produces a volume and rate of
runoff unique to that area.
2. Reach: Uniform streams, channels, or pipes that convey stormwater from one point to another.
3. Pond: Natural or man-made impoundment, which temporarily stores stormwater runoff and
empties in a manner determined by its geometry and the hydraulic structure located at its
outlets.
Subcatchments, reaches, and ponds are represented by hexagons, squares, and triangles,
respectively, on the watershed routing diagrams provided with the computations included in Appendix
D and Appendix E.
The analysis of hydrologic and hydraulic conditions and proposed stormwater management facilities,
servicing the study area, was performed by dividing the tributary watershed into relatively
homogeneous subcatchments. The separation of the watershed into subcatchments was dictated by
watershed conditions, methods of collection, conveyance, and points of discharge. Watershed
characteristics for each subcatchment were then assessed from United States Geological Service
(USGS) 7.5-minute topographic maps, aerial photographs, a topographical survey, soil surveys, site
investigations, and land use maps.
Proposed stormwater management practices were designed and evaluated in accordance with the
Design Manual and local regulatory requirements. A local IDF file was imported, and specific mass
curves were generated, in HydroCAD to evaluate the pre- and post-development stormwater runoff
characteristics for various 24-hour storm events identified in the following Table.
Stormwater Pollution Prevention Plan
Page 12
2241067
Page 430 of 1493
Page 431
Table 10: Design Events
Facility 24-hour Storm Event
Storm Sewer 10-year
1-year
Stormwater Management Practice(s) 10-year
100-year
Flood Conditions 100-year
3.6.3 Performance Summary
A comparison of the total required and provided CPv for the 1-year 24-hour storm event is shown in
the following table:
Table 11: CPv Summary
Design Point Required CPv Provided CPv
(DP) (af) (af)
1 0.20 0.36
A comparison of the pre- and post-development watershed conditions was performed for all Design
Points and storm events evaluated herein. For all Design Points and design storms, this comparison
demonstrates that the peak rate of runoff will not be increased. Therefore, the project will not have a
significant adverse impact on the adjacent or downstream properties or receiving water courses.
The results of the computer modeling used to analyze the pre- and post-development watersheds are
presented in Appendix D and Appendix E, respectively. The following Table summarizes the results of
this analysis.
Table 12: Summary of Pre- and Post-Development Peak Discharge Rates
Pre- vs. Post-Development Discharge Rate (cfs)
Design Point 10-year 24-hour storm event 100-year 24-hour storm event
(DP) Pre Post Pre Post
1 16.3 13.9 36.8 31.7
3.7 Climate Change Consideration
This report presents the consideration for future physical risks due to climate change, in accordance
with Part III.A.2 of the permit. Overall site planning, control measures and practices, conveyance
systems and detention systems were evaluated against the seven (7) physical risks identified by
NYSDEC due to climate change pursuant to the Community Risk and Resiliency Act (CRRA), 6 NYCRR
490, and associated guidance. Appendix C provides a description of each consideration, specific to
the project.
Stormwater Pollution Prevention Plan
Page 13
2241067
Page 431 of 1493
Page 432
4.0 CONSTRUCTION SEQUENCE
This project has not received written approval from the Town of West Seneca allowing the disturbance
of more than five acres of land at any one time. Therefore, if the Contractor’s construction sequence
requires the disturbance of more than five acres at any one time, written approval must be obtained
from written approval from the Town of West Seneca prior to disturbing more than five acres at once.
The “Erosion and Sediment Control Plan” and the “Erosion and Sediment Control Plan Prior to
Construction” in the accompanying drawings and waiver request identifies the major construction
activities that are the subject of this SWPPP. The order (or sequence) in which the major activities are
expected to begin is presented on the accompanying drawings, though each activity will not necessarily
be completed before the next begins. In addition, these activities could occur in a different order if
necessary to maintain adequate erosion and sediment control. If this is the case, the contractor shall
notify the Owner’s/Operator’s Engineer overseeing the implementation of the SWPPP.
The Contractor will be responsible for implementing the erosion and sediment control measures
identified on the plans. The Contractor may designate these tasks to certain subcontractors as they
see fit, but the ultimate responsibility for implementing these controls and ensuring their proper
function remains with the Contractor.
In accordance with Part III.B.c.iv. a phasing plan for the project and sequencing plans for all phases
have been provided. The plans address clearing and grubbing, excavation and grading, utility and
infrastructure installation, final stabilization, and any other construction activity at the site that will
result in soil disturbance. Refer to the plans for further information on the project phasing and
sequencing.
5.0 CONSTRUCTION-PHASE POLLUTION CONTROL
The SWPPP and accompanying plans identify the temporary and permanent erosion and sediment
control measures that have been incorporated into the design of this project. These measures will be
implemented during construction, to minimize soil erosion and control sediment transport off-site, and
after construction, to control the quality and quantity of stormwater runoff from the developed site.
Erosion control measures, designed to minimize soil loss, and sediment control measures, intended
to retain eroded soil and prevent it from reaching water bodies or adjoining properties, have been
developed in accordance with the following documents:
• NYSDEC SPDES General Permit for Stormwater Discharges From Construction Activity, Permit
No. GP-0-25-001 (effective January 29, 2025 through January 28, 2030)
• New York State Standards and Specifications for Erosion and Sediment Control, NYSDEC
(November 2016)
The SWPPP and accompanying plans outline the construction scheduling for implementing the erosion
and sediment control measures. These documents include limitations on the duration of soil exposure,
criteria and specifications for placement and installation of the erosion and sediment control
measures, a maintenance schedule, and specifications for the implementation of erosion and
sediment control practices and procedures.
Temporary and permanent erosion and sediment control measures that shall be applied during
construction generally include:
Stormwater Pollution Prevention Plan
Page 14
2241067
Page 432 of 1493
Page 433
1. Minimizing soil erosion and sedimentation by stabilization of disturbed areas and by removing
sediment from construction site discharges.
2. Preservation of existing vegetation to the greatest extent practical. Following the completion
of construction activities in any portion of the site, permanent vegetation shall be established
on all exposed soils.
3. Site preparation activities to minimize the area and duration of soil disruption.
4. Establishment of permanent traffic corridors to ensure that “routes of convenience” are
avoided.
5.1 Temporary Erosion and Sediment Control Measures
The temporary erosion and sediment control measures described in the following sections are
included as part of the construction documents.
5.1.1 Stabilized Construction Access
Prior to construction, stabilized construction access(es) will be installed, per accompanying plans, to
reduce the tracking of sediment onto public roadways.
Construction traffic must enter and exit the site at the stabilized construction access(es). The intent is
to trap dust and mud that would otherwise be carried off-site by construction traffic.
The access(es) shall be maintained in a condition, which will control tracking of sediment onto public
rights-of-way or streets. When necessary, additional aggregate will be placed atop the filter fabric to
assure the minimum thickness is maintained. All sediment and/or soil spilled, dropped, or washed
onto public rights-of-way must be removed immediately. Periodic inspection and needed maintenance
shall be provided after each substantial rainfall event.
5.1.2 Dust Control
Water trucks shall be used as needed during construction to reduce dust generated on-site. Dust
control must be provided by the Contractor(s) to a degree that is acceptable to the Owner, and in
compliance with the applicable local and state dust control requirements.
5.1.3 Temporary Soil Stockpile
Materials, such as topsoil, will be temporarily stockpiled (if necessary) on the site during the
construction process. Stockpiles shall be located in an area away from storm drainage, water bodies
and/or courses, and will be properly protected from erosion by a surrounding silt fence barrier.
5.1.4 Silt Fencing
Prior to the initiation of and during construction activities, a geotextile filter fabric (or silt fence) will be
established downgradient of all disturbed areas. These barriers may extend into non-impact areas to
provide adequate protection of adjacent lands.
Clearing and grubbing will be performed only as necessary for the installation of the sediment control
barrier. To facilitate effectiveness of the silt fencing, daily inspections and inspections immediately
after significant storm events will be performed by the Contractor(s). Maintenance of the fence will be
performed as needed.
Stormwater Pollution Prevention Plan
Page 15
2241067
Page 433 of 1493
Page 434
5.1.5 Temporary Seeding
For areas undergoing clearing, grading, and disturbance as part of construction activities, where work
has temporarily ceased, temporary soil stabilization measures must be initiated by the end of the next
business day and completed within fourteen (14) days from the date the soil disturbance activity has
temporarily ceased.
5.1.6 Manufactured Insert Inlet Protection
Install insert inlet protection beneath the grate of all catch basins, to prevent sediment from entering
the catch basins and storm sewer system. Remove sediment accumulation and repair or replace insert
as necessary to ensure proper function.
5.1.7 Filter Fabric Drop Inlet Protection
Install filter fabric or silt fence with wooden stakes at the perimeter of existing or proposed catch basins
located in lawn areas, to prevent sediment from entering the catch basins and storm sewer system.
Remove sediment accumulation and repair or replace fabric as necessary to ensure proper function.
5.1.8 Erosion Control Blanket
Erosion control blankets shall be installed in accordance with manufacturer’s requirements on all
slopes exceeding 3:1. Erosion control blankets provide temporary erosion protection, rapid vegetative
establishment, and long-term erosion resistance to shear stresses generated by high runoff flow
velocities associated with steep slopes.
5.1.9 Stone Check Dams
Stone check dams will be installed within drainage ditches to reduce the velocity of stormwater runoff,
promote settling of sediment, and reduce sediment transport off-site.
Sediment accumulated behind the stone check dam will be removed as needed to maintain flow
through the stone check dam and prevent large flows from carrying sediment over or around the dam.
Stones shall be replaced as needed to maintain the design cross section of the structures.
5.1.10 Temporary Sediment Trap
Temporary sediment traps shall be constructed to intercept sediment-laden runoff, reduce the amount
of sediment leaving the disturbed areas, and protect drainage ways, properties, and rights-of-way.
Accumulated sediment shall be removed from the trap when it reaches no greater than 50 percent of
the design capacity. Sediment shall not be placed downstream from the embankment, adjacent to a
stream, or floodplain.
Temporary sediment traps depicted on the accompanying plans have been designed to provide 3,600
CF of storage per acre of tributary watershed.
5.1.11 Temporary Diversion Swales
Temporary diversion swales shall be used to divert off-site runoff around the construction site and
divert runoff from stabilized areas around disturbed areas.
5.1.12 Dewatering Operations
Dewatering will be used to intercept sediment-laden stormwater or pumped groundwater and allow it
to settle out of the pumped discharge prior to being discharged from the site. Water from dewatering
Stormwater Pollution Prevention Plan
Page 16
2241067
Page 434 of 1493
Page 435
operations shall be treated to eliminate the discharge of sediment and other pollutants. Water
resulting from dewatering operations shall be directed to temporary sediment traps or dewatering
devices. Temporary sediment traps and dewatering bags will be provided, installed, and maintained
at downgradient locations to control sediment deposits to downstream surfaces.
5.1.13 Fiber Roll
Prior to the initiation of and during construction activities, fiber rolls (12” minimum diameter) will be
established downgradient of all disturbed areas to reduce sheet flow on slopes. These rolls may extend
into non-impact areas to provide adequate protection of adjacent lands. Spacing will conform to
NYSDEC specification for straw bale dike.
Clearing and grubbing will be performed only as necessary for the installation of the fiber rolls. To
facilitate effectiveness, daily inspections and inspections immediately after significant storm events
will be performed by the Contractor(s) and maintenance will be performed as needed.
5.2 Permanent Erosion and Sediment Control Measures
The permanent erosion and sediment control measures described in the following sections are
included as part of the construction documents.
5.2.1 Establishment of Permanent Vegetation
Disturbed areas that will be vegetated must be seeded in accordance with the contract documents.
The type of seed, mulch, and maintenance measures as described in the contract documents shall
also be followed.
Permanent soil stabilization measures must be initiated by the end of the next business day and
completed within fourteen (14) days from the date the soil disturbance activity has permanently
ceased.
Final site stabilization is achieved when all soil-disturbing activities at the site have been completed
and a uniform, perennial vegetative cover with a density of 80 percent has been established or
equivalent stabilization measures (such as the use of mulches or geotextiles) have been employed on
all unpaved areas and areas not covered by permanent structures.
5.2.2 Rock Outlet Protection
Rock outlet protection shall be installed at the locations as indicated and detailed on the
accompanying plans. The installation of rock outlet protection will reduce the velocity and energy of
water, such that the flow will not erode downstream surfaces.
5.3 Implementation Schedule for Erosion and Sediment Control Measures
Proper implementation of the outlined erosion and sediment control measures is critical to minimizing
soil erosion and controlling off-site sediment transport during construction, as well as controlling the
quality and quantity of stormwater runoff from the developed site after construction. The following
table outlines the implementation schedule for initial placement of these measures, and the duration
for which they should remain in place.
Stormwater Pollution Prevention Plan
Page 17
2241067
Page 435 of 1493
Page 436
Table 13: Implementation Schedule for Erosion and Sediment Control Measures
Erosion and Sediment
Initial Placement Duration to Remain In-Place
Control Measure
Stabilized Construction Access Upon mobilizing to site Until construction is complete
Dust Control As needed As needed
Upon delivery of materials to the
Until materials have been placed
Temporary Soil Stockpile site or excavation of on-site
or removed from the site
materials for reuse
Prior to upgradient soil Until upgradient area has achieved
Silt Fencing
disturbance permanent stabilization
Apply to any disturbed soil that will
Apply additional seed as needed
Temporary Seeding remain exposed for more than 14
for temporary stabilization
days
Existing structures: prior to
Manufactured Insert Inlet upgradient soil disturbance Until upgradient area has achieved
Protection New structures: upon installation permanent stabilization
of structure/grate
Upon completion of slope grading Prior to final grading, or kept in
Erosion Control Blanket
operations place permanently
Existing swales: upon completion
of swale reshaping
Stone Check Dams Permanent
New swales: upon completion of
swale excavation
As needed during grading Until final grading of tributary area
Temporary Sediment Trap
operations is complete
Until permanent drainage methods
As needed to divert flow around are established (i.e. closed storm
Temporary Diversion Swales
work area sewer, open conveyance swales,
etc.)
Until excavation/backfilling is
Dewatering Operations As needed during excavation
complete
Prior to upgradient soil Until upgradient area has achieved
Fiber Roll
disturbance permanent stabilization
Permanent, apply additional seed
Establishment of Permanent As soon as possible after
as needed to achieve 80%
Vegetation completion of final grading
minimum uniform coverage
During installation of tributary
Rock Outlet Protection Permanent
culverts/pipes
5.4 Other Pollutant Controls
Part I.C.1 of GP-0-25-001 prohibits discharges from construction material wastewater, pollutants
used in vehicle and equipment operation and maintenance, vehicle and equipment washing and
toxic or hazardous substances.
Stormwater Pollution Prevention Plan
Page 18
2241067
Page 436 of 1493
Page 437
The following table identifies materials and/or chemicals commonly used and/or stored on
construction sites and should be addressed in the site-specific spill prevention and response plan:
Stormwater Pollution Prevention Plan
Page 19
2241067
Page 437 of 1493
Page 438
Table 14: Common Construction Pollutants
Material/Chemical Physical Description Stormwater Pollutants Location*
Pesticides Various colored to Chlorinated Herbicides used for
(insecticides, colorless liquid, hydrocarbons, noxious weed control
fungicides, powder, pellets, or organophosphates,
herbicides, grains carbamates, arsenic
rodenticides)
Fertilizer Liquid or solid grains Nitrogen, phosphorous Newly seeded areas
Cleaning solvents Colorless, blue, or Perchloroethylene, No equipment cleaning
yellow-green liquid methylene chloride, allowed in project limits
trichloroethylene,
petroleum distillates
Asphalt Black solid Oil, petroleum distillates Streets and roofing
Concrete White solid/grey liquid Limestone, sand, pH, Curb and gutter, building
chromium construction
Curing compounds Creamy white liquid Naphtha Curb and gutter
Hydraulic oil/fluids Brown oily petroleum Mineral oil Leaks or broken hoses
hydrocarbon from equipment
Gasoline Colorless, pale brown Benzene, ethyl benzene, Secondary containment /
or pink petroleum toluene, xylene, MTBE staging area
hydrocarbon
Diesel Fuel Clear, blue-green to Petroleum distillate, oil & Secondary containment /
yellow liquid grease, naphthalene, staging area
xylenes
Kerosene Pale yellow liquid Coal oil, petroleum Secondary containment /
petroleum distillates staging area
hydrocarbon
Antifreeze/coolant Clear green/yellow Ethylene glycol, propylene Leaks or broken hoses
liquid glycol, heavy metals from equipment
(copper, lead, zinc)
Sanitary toilets Various colored liquid Bacteria, parasites, and Staging area
viruses
Construction
materials
Granular fill Various colored solids Sediment Stockpile / fill areas
Subbase course Gray/brown solid Sediment, dust Stockpile
Topsoil Brown solid Sediment Stockpile
Mulch Various colored solid Sediment, debris Staging area
Seed Brown/yellow solid Nutrients, debris Staging area
HDPE Storm Pipe Black solid Staging area
SDR-35, SDR-21 Various colored solid Staging area
PVC Pipe
Metals Frames and Gray solid Staging area
Grates
Joint Sealant Light gray viscous Polyurethane Staging area
solid
*(Area where material/chemical is used on-site)
Stormwater Pollution Prevention Plan
Page 20
2241067
Page 438 of 1493
Page 439
5.5 Construction Housekeeping Practices
During the construction phase, the Contractor(s) will implement the following measures:
5.5.1 Sediment Sweeping/Vacuuming
Any sediment that is tracked by construction vehicles or erosion onto adjacent public or private
impervious surfaces must be swept or vacuumed, utilizing self-propelled and/or walk-behind
equipment, and removed on a daily basis. Kick brooms and sweeper attachments are not an
acceptable means of sweeping. Sweeping or vacuuming should not take place while tracked sediment
is wet. If tracked sediment is compacted, the sediment must be scraped loose prior to sweeping or
vacuuming.
5.5.2 Material Stockpiles
Material resulting from clearing and grubbing operations that will be stockpiled on-site, must be
adequately protected with downgradient erosion and sediment controls.
5.5.3 Equipment Cleaning and Maintenance
The Contractor(s) will designate areas for equipment cleaning, maintenance, and repair. The
Contractor(s) and subcontractor(s) will utilize those areas. The areas will be protected by a temporary
perimeter berm.
5.5.4 Detergents
The use of detergents for large-scale washing is prohibited (i.e., vehicles, buildings, pavement
surfaces, etc.)
5.5.5 Spill Prevention and Response
A Spill Prevention and Response Plan shall be developed, for the pollutants identified in Section 5.3,
for the site by the Contractor(s) that addresses the following:
1. Reducing chance of spills
2. Stopping the source of spills
3. Containing and cleaning up spills
4. Disposing of materials contaminated by spills
5. Training personnel responsible for spill prevention/response
6. Material handling procedures
7. Material storage requirements
The plan shall detail the steps required in the event of an accidental spill and shall identify contact
names and phone numbers of people and agencies that must be notified.
The plan shall include Safety Data Sheets (SDS) for all materials to be stored on-site. All workers on-
site will be required to be trained on safe handling and spill prevention procedures for all materials
used during construction. Regular tailgate safety meetings shall be held and all workers that are
expected on the site during the week shall be required to attend.
5.5.6 Concrete Washout Areas
A temporary concrete washout area shall be provided for every project where concrete will be poured
or otherwise formed on-site and shall consist of an excavated or above-ground lined construction pit
Stormwater Pollution Prevention Plan
Page 21
2241067
Page 439 of 1493
Page 440
where concrete trucks or equipment can be washed out after their loads have been discharged. Waste
generated from concrete wash water that shall not be allowed to flow into drainage ways, inlets,
receiving waters, highway right-of-way, or any location other than the designated concrete washout
area(s). Proper signage shall be placed adjacent to the facility to designate the “Concrete Washout
Area”. Locate the facility a minimum of 100-feet from drainage swales, storm drain inlets, wetlands,
streams, and other surface waters. Prevent surface water from entering the washout area.
The hardened residue from the concrete wash areas will be disposed of in the same manner as other
non-hazardous construction waste materials. Maintenance of the washout area shall include removal
of hardened material when 75% of the storage capacity is filled, and a minimum freeboard of 12
inches shall be maintained. The Contractor will be responsible for seeing that these procedures are
followed. The project may require the use of multiple concrete washout areas based on the frequency
of concrete pours.
5.5.7 Material Storage
Construction materials shall be stored in a dedicated staging area. The staging area shall be located
in an area that prevents negative impacts of construction materials on stormwater quality.
Chemicals, paints, solvents, fertilizers, and other toxic material must be stored in waterproof
containers. Except during application, the contents must be kept in trucks or within storage facilities.
Runoff containing such material must be collected, removed from the site, treated, and disposed of at
an approved solid waste or chemical disposal facility.
6.0 INSPECTIONS, MAINTENANCE, AND REPORTING
6.1 Inspection and Maintenance Requirements
6.1.1 Pre-Construction Inspection and Certification
Prior to the commencement of construction, the Qualified Inspector/Qualified Professional shall
conduct an assessment of the site and certify that the appropriate erosion and sediment control
measures have been adequately installed and implemented. The Contractor shall contact the Qualified
Inspector/Qualified Professional once the erosion and sediment control measures have been
installed.
6.1.2 Construction Phase Inspections and Maintenance
A Qualified Inspector/Qualified Professional, as defined in Appendix A of the General Permit GP-0-25-
001, shall conduct regular site inspections between the time this SWPPP is implemented and final site
stabilization. Site inspections shall occur at an interval of at least once every seven (7) calendar days.
The purpose of site inspections is to assess performance of pollutant controls. Based on these
inspections, the Qualified Inspector/Qualified Professional will decide whether it is necessary to modify
this SWPPP, add or relocate sediment barriers, or whatever else may be needed in order to prevent
pollutants from leaving the site via stormwater runoff. The general contractor has the duty to cause
pollutant control measures to be repaired, modified, maintained, supplemented, or whatever else is
necessary in order to achieve effective pollutant control.
Examples of particular items to evaluate during site inspections are listed below. This list is not
intended to be comprehensive. During each inspection the inspector must evaluate overall pollutant
Stormwater Pollution Prevention Plan
Page 22
2241067
Page 440 of 1493
Page 441
control system performance as well as particular details of individual system components. Additional
factors should be considered as appropriate to the circumstances.
1. Locations where vehicles enter and exit the site must be inspected for evidence of off-site
sediment tracking. A stabilized construction access will be constructed where vehicles enter
and exit. This access will be maintained or supplemented as necessary to prevent sediment
from leaving the site on vehicles.
2. Sediment barriers must be inspected and, if necessary, they must be enlarged or cleaned in
order to provide additional capacity. All material from behind sediment barriers will be
stockpiled on the up slope side. Additional sediment barriers must be constructed as needed.
3. Inspections will evaluate disturbed areas and areas used for storing materials that are exposed
to rainfall for evidence of, or the potential for, pollutants entering the drainage system. If
necessary, the materials must be covered or original covers must be repaired or
supplemented. Also, protective berms must be constructed, if needed, in order to contain
runoff from material storage areas.
4. Grassed areas will be inspected to confirm that a healthy stand of grass is maintained. The
site has achieved final stabilization once all areas are covered with building foundation or
pavement, or have a stand of grass with at least 80 percent density. The density of 80 percent
or greater must be maintained to be considered as stabilized. Areas must be watered,
fertilized, and reseeded as needed to achieve this goal.
5. All discharge points must be inspected to determine whether erosion control measures are
effective in preventing significant impacts to receiving waters.
The inspection reports must be completed entirely and additional remarks should be included if
needed to fully describe a situation. An important aspect of the inspection report is the description of
additional measures that need to be taken to enhance plan effectiveness. The inspection report must
identify whether the site was in compliance with the SWPPP at the time of inspection and specifically
identify all incidents of non-compliance.
Within one (1) business day of the completion of an inspection, the Qualified Inspector/Qualified
Professional shall notify the Owner/Operator and appropriate contractor or subcontractor of any
corrective actions that need to be taken. For corrective actions not requiring engineering design, the
contractor must begin implementing corrective actions within one business day and complete the
corrective actions within five business days. For corrective actions requiring engineering design, the
engineering design process must begin within five business days and the contractor must complete
the corrective action in a reasonable time frame but no later than 60 calendar days.
In addition to the inspections performed by the Qualified Inspector/Qualified Professional, the
Contractor shall perform routine inspections that include a visual check of all erosion and sediment
control measures. All inspections and maintenance shall be performed in accordance with the
inspection and maintenance schedule provided on the accompanying plans. Sediment removed from
erosion and sediment control measures will be exported from the site, stockpiled for later use, or used
immediately for general non-structural fill.
It is the responsibility of the general contractor to assure the adequacy of site pollutant discharge
controls. Actual physical site conditions or contractor practices could make it necessary to install more
structural controls than are shown on the accompanying plans. (For example, localized concentrations
of runoff could make it necessary to install additional sediment barriers, sediment traps, etc.)
Assessing the need for additional controls and implementing them or adjusting existing controls will
be a continuing aspect of this SWPPP until the site achieves final stabilization.
Stormwater Pollution Prevention Plan
Page 23
2241067
Page 441 of 1493
Page 442
6.1.3 Temporary Suspension of Construction Activities
For construction sites where soil disturbance activities have been temporarily suspended (e.g. Winter
shutdown) and temporary stabilization measures have been applied to all disturbed areas, the
frequency of Qualified Inspector/Qualified Professional inspections can be reduced to once every 30
calendar days. Prior to reducing the frequency of inspections, the Owner/Operator shall notify the
NYSDEC Region 9 stormwater contact person and the Town of West Seneca in writing.
6.1.4 Partial Project Completion
For construction sites where soil disturbance activities have been shut down with partial project
completion, all areas disturbed as of the project shutdown date have achieved final stabilization, and
all post-construction stormwater management practices required for the completed portion of the
project have been constructed in conformance with the SWPPP and are operational, the inspections
by the Qualified Inspector/Qualified Professional can stop. Prior to the shutdown, the Owner/Operator
shall notify the NYSDEC Region 9 stormwater contact person and the Town of West Seneca in writing.
If soil disturbance activities have not resumed within two years from the date of shutdown, a Notice of
Termination (NOT) shall be properly completed and submitted to the NYSDEC.
6.1.5 Post-Construction Inspections and Maintenance
Inspections and maintenance of final stabilization measures and post-construction stormwater
management practices shall be performed in accordance with Appendix G, once all disturbed areas
are stabilized and all stormwater management systems are in place and operable.
6.2 Reporting Requirements
6.2.1 Inspection Reports
Pursuant to Part IV.C of GP-0-25-001, inspection reports shall be prepared for the duration of
construction, as outlined herein, and shall be signed by the Qualified Inspector or Qualified
Professional. A sample inspection form is provided in Appendix F.
At a minimum, each inspection report shall record the following information:
1. Permit identification number; and
2. Date and time of inspection; and
3. Name and title of person(s) performing inspection; and
4. A description of the weather and soil conditions (e.g. dry, wet, saturated) at the time of the
inspection, including the temperature at the time of the inspection; and
5. A description of the condition of the runoff at all points of discharge from the construction site.
This must include identification of any discharges of sediment from the construction site.
Include discharges from conveyance systems (i.e. pipes, culverts, ditches, etc.) and overland
flow; and
6. A description of the condition of all surface waters of the State located within, or immediately
adjacent to, the property boundaries of the construction site which receive runoff from
disturbed areas. This must include identification of any discharges of sediment to the surface
waters of the State; and
Stormwater Pollution Prevention Plan
Page 24
2241067
Page 442 of 1493
Page 443
7. Identification of all erosion and sediment control practices and pollution prevention measures
that need repair or maintenance; and
8. Identification of all erosion and sediment control practices and pollution prevention measures
that were not installed properly or are not functioning as designed and need to be reinstalled
or replaced; and
9. Description and sketch (map) of areas with active soil disturbance activity, areas that have
been disturbed but are inactive at the time of the inspection, and areas that have been
stabilized (temporary and/or final) since the last inspection; and
10. Estimates, in square feet or acres, of the following areas:
a. Total area with active soil disturbance (not requiring either temporary stabilization or
final stabilization); and
b. Total area with inactive soil disturbance (requiring either temporary stabilization or
final stabilization); and
c. Total area that has achieved temporary stabilization; and
d. Total area that has achieved final stabilization; and
11. Current stage of construction of all SMPs and identification of all construction activity on site
that is not in conformance with the SWPPP and technical standards; and
12. Corrective action(s) that must be taken to install, repair, replace or maintain erosion and
sediment control practices and pollution prevention measures; and to correct deficiencies
identified with the construction of the SMP(s); and
13. Identification and status of all corrective actions that were required by previous inspection;
and
14. Digital photographs, with date stamp, that clearly show the condition of all practices that have
been identified as needing corrective actions. The qualified inspector must attach color copies
of the digital photographs to the inspection report being maintained onsite within seven (7)
calendar days of the date of the inspection. The qualified inspector must also take digital
photographs, with date stamp, that clearly show the condition of the practice(s) after the
corrective action has been completed. The qualified inspector must attach paper color copies
of the digital photographs to the inspection report that documents the completion of the
corrective action work within seven (7) calendar days of that inspection.
6.2.2 Site Log Book
Pursuant to Part I.E.3 of GP-0-25-001, the Owner/Operator shall retain a copy of the General Permit,
NOI, NOI Acknowledgment Letter, MS4 SWPPP Acceptance Form (if applicable), inspection reports,
contractor and subcontractor certification forms, and all documentation necessary to demonstrate
eligibility under the permit, at the construction site from commencement of construction activity until
the date that all areas of disturbance have achieved final stabilization and the Notice of Termination
has been submitted to the NYSDEC.
The Site Log Book shall be maintained on-site in a secure location (i.e. job trailer, on-site construction
office, or mailbox with lock) and must be accessible during normal business hours to an individual
performing a compliance inspection.
Stormwater Pollution Prevention Plan
Page 25
2241067
Page 443 of 1493
Page 444
6.2.3 Post Construction Records and Archiving
Following construction, the Owner/Operator shall retain copies of the SWPPP, the complete
construction Site Log Book, and records of all data used to complete the NOI to be covered by this
permit, for a period of at least five years from the date that the site is finally stabilized. This period may
be extended by the NYSDEC, at its sole discretion, at any time upon written notification.
Records shall be maintained of all post construction inspections and maintenance work performed in
accordance with the requirements outlined in Appendix G.
7.0 SWPPP IMPLEMENTATION RESPONSIBILITIES
A summary of the responsibilities and obligations of all parties involved with compliance with the
NYSDEC SPDES General Permit GP-0-25-001 conditions is outlined in the subsequent sections. For a
complete listing of the definitions, responsibilities, and obligations, refer to the SPDES General Permit
GP-0-25-001 presented in Appendix J.
7.1 Owner’s/Operator's Responsibilities
1. Ensure that control measures are selected, designed, installed, implemented and maintained
to minimize the discharge of pollutants and prevent a violation of the water quality standards,
meeting the non-numeric effluent limitations in Part II.B.1.(a)-(e) of the SPDES General Permit
and in accordance with the New York State Standards and Specifications for Erosion and
Sediment Control, dated November 2016.
2. Ensure that practices are selected, designed, installed, and maintained to meet the
performance criteria in the Design Manual. Practices must be designed to meet the applicable
sizing criteria in Part II.C.2.a., b., c. or d. of GP-0-25-001.
3. Retain the services of a “Qualified Inspector” or “Qualified Professional” as defined under GP-
0-25-001, to provide the services outlined in Section 7.5 “Qualified Inspector’s/Qualified
Professional’s Responsibilities.”
4. Retain the services of a “Qualified Professional,” as defined under GP-0-25-001, to provide
the services outlined in Section 2.3 “Owner’s/Operator’s Engineers Responsibilities.”
5. Have an authorized corporate officer sign the Owner/Operator Certification Form to
accompany the eNOI. A copy of the completed NOI is included in Appendix B.
6. Submit the electronic version of the NOI (eNOI) along with the MS4 SWPPP acceptance form
using the NYSDEC’s website (http://www.dec.ny.gov/chemical/43133.html).
7. Pay the required initial and annual fees upon receipt of invoices from NYSDEC. These invoices
are generally issued in the fall of each year. The initial fee is calculated as $110.00 per acre
disturbed plus $675.00 per acre of net increase in impervious cover, and the annual fee is
$110.00.
8. Prior to the commencement of construction activity, identify the contractor(s) and
subcontractor(s) that will be responsible for installing, constructing, repairing, replacing,
inspecting, and maintaining the erosion control practices included in the SWPPP and the
Stormwater Pollution Prevention Plan
Page 26
2241067
Page 444 of 1493
Page 445
contractor(s) and subcontractor(s) that will be responsible for constructing the SMPs included
in the SWPPP. Each of the contractors and subcontractors must identify at least one person
from their company to be the trained contractor that will be responsible for implementation of
the SWPPP. Ensure that at least one trained contractor is on site daily when soil disturbance
activities are being performed.
9. Schedule a pre-construction meeting which shall include the Town of West Seneca
representative, Owner’s/Operator’s Engineer, Qualified Inspector, Contractor, and their sub-
contractors to discuss responsibilities as they relate to the implementation of this SWPPP.
10. Retain the services of an independent certified materials testing and inspection firm operating
under the direction of a licensed Professional Engineer to perform regular tests, inspections,
and certifications of the construction materials used in the construction of all post-construction
stormwater management practices.
11. Retain the services of a NYS licensed land surveyor to perform an as-built topographic survey
of the completed post-construction stormwater management facilities.
12. Require the Contractor to fully implement the SWPPP prepared for the site by the
Owner/Operator’s Engineer to ensure that the provisions of the SWPPP are implemented from
the commencement of construction activity until all areas of disturbance have achieved final
stabilization and the Notice of Termination (NOT) has been submitted to the NYSDEC.
13. The Owner/Operator is authorized to commence construction activity as of the authorization
date indicated in the Letter of Authorization (LOA), which is sent by NYSDEC after a complete
eNOI is submitted.
14. Within five (5) business days of receipt of the LOA, send an electronic copy of the LOA to the
MS4 operator(s) with review authority.
15. Forward a copy of the LOA received from DEC to the Owner’s/Operator’s Engineer for project
records, and to the Contractor for display at the construction site.
16. As of the date the LOA is received, the Owner/Operator must make the eNOI, SWPPP and LOA
available for review and copying in accordance with the requirements in Part VII.H. of GP-0-25-
001. When applicable, as of the date an updated LOA is received, the Owner/Operator must
make the updated LOA available for review and copying in accordance with the requirements
in Part VII.H.
17. The Owner/Operator must ensure compliance with all requirements of GP-0-25-001 and that
the provisions of the SWPPP, including any changes made to the SWPPP in accordance with
Part III.A.5., are properly implemented and maintained from the commencement of
construction activity until all area of disturbance have achieved final stabilization; and the
Owner/Operator’s coverage under the permit is terminated in accordance with Part V.A.5.a.
18. As of the date of the commencement of construction activities until Part I.E.2.a. and b. have
been met, the Owner/Operator must maintain at the construction site, a copy of all
documentation necessary to demonstrate eligibility with GP-0-25-001, a copy of GP-0-25-001,
the SWPPP, the signed SWPPP Preparer Certification Form, the signed MS4 SWPPP
Acceptance Form, signed Owner/Operator Certification Form, eNOI, and LOA, and LOA
transmittal to the MS4 Operator in accordance with Part I.D.3.c.
Stormwater Pollution Prevention Plan
Page 27
2241067
Page 445 of 1493
Page 446
19. The Owner/Operator must maintain at the construction site, until Part I.E.2.a and b. have been
met, as of the date the documents become final or are received, a copy of the responsible
contractor’s or subcontractor's certification statement(s) in accordance with Part III.A.7, and
inspection reports in accordance with Part IV.C.4. and 6.
20. The Owner/Operator must maintain the documents in a secure location, such as a job trailer,
on-site construction office, or mailbox with lock. The secure location must be accessible during
normal business hours to an individual performing a compliance inspection. The documents
must be paper documents unless electronic documents are accessible to the inspector during
an inspection to the same extent as a paper copy stored at the site would be. If electronic
documents are kept on site, the Owner/Operator must maintain functional equipment on site
available to an inspector during normal hours of operation such that an inspector may view
the electronic documents in a format that can be read in a similar manner as a paper record
and in a legally dependable format with no less evidentiary value than their paper equivalent.
21. Upon finding a significant non-compliance with the practices described in the SWPPP or
violation of GP-0-25-001, NYSDEC may order an immediate stop to all construction activity at
the site until the non-compliance is remedied. The stop work order must be in writing, describe
the non-compliance in detail, and be sent to the Owner/Operator. Forward a copy of any stop
work order received immediately to the Owner’s/Operator’s Engineer and to the Contractor.
22. If any human remains or archaeological remains are encountered during excavation, the
Owner/Operator must immediately cease, or cause to cease, all construction activity in the
area of the remains and notify the appropriate Regional Water Engineer (RWE). Construction
activity shall not resume until written permission to do so has been received from the RWE.
23. To be authorized to implement modifications to the information previously submitted in the
eNOI, the Owner/Operator must notify NYSDEC via email at [email protected]
requesting access to update the eNOI, update the eNOI to reflect the modifications and
resubmit the eNOI in accordance with Part I.D., and receive an updated LOA.
24. The eNOI, SWPPP, LOA, updated LOAs, and inspection reports required by GP-0-25-001 are
public documents that the Owner/Operator must make available for review and copying by any
person within five (5) business days of the Owner/Operator receiving a written request by any
such person to review these documents. Copying of documents will be done at the requester’s
expense.
25. The Owner/Operator must terminate coverage when the project reaches total project
completion, has a planned shutdown with partial project completion, is changing
Owner/Operator or has obtained coverage under an alternative general SPDES permit or an
individual SPDES permit.
26. Have a qualified inspector perform a final site inspection prior to submitting the eNOT.
27. Have the MS4 sign the MS4 Acceptance statement on the eNOT in accordance with the
requirements in Part VII.J.
28. Prior to submitting a Notice of Termination, ensure for SMP(s) that are privately owned, the
Owner/Operator has a mechanism in place that requires operation and maintenance of the
practice(s) in accordance with the operation and maintenance plan, such as a deed covenant
in the Owner/Operator’s deed of record.
Stormwater Pollution Prevention Plan
Page 28
2241067
Page 446 of 1493
Page 447
29. Submit a complete Notice of Termination form electronically using the NYSDEC eNOT.
Coverage is terminated as of the termination date indicated in the Letter of Termination (LOT),
which is sent by NYSDEC after a complete eNOT is submitted.
30. Request and receive all SWPPP records from the Owner’s/Operator’s Engineer and archive
those records, along with the LOT, for a period of at least five (5) years from the date that
NYSDEC accepts a complete NOT submitted.
31. Implement the Post-Construction Inspections and Maintenance procedures outlined in
Appendix G.
32. The Owner/Operator must keep the SWPPP current so that it at all times accurately documents
the erosion and sediment controls practices that are being used or will be used during
construction, and all post-construction stormwater management practices that will be
constructed on the site. At a minimum, the Owner/Operator shall amend the SWPPP, including
construction drawings:
a) Whenever the current provisions prove to be ineffective in minimizing pollutants in
stormwater discharges from the project site;
b) Whenever there is a change in design, construction, or operation at the construction
site that has or could have an effect on the discharge of pollutants; and
c) To address issues or deficiencies identified during an inspection by the “Qualified
Inspector,” the Department, or other Regulatory Authority.
d) To document the final construction conditions.
33. When property ownership changes or when there is a change in operational control over the
construction plans and specifications, the original owner or operator must notify the new owner
or operator, in writing, of the requirement to obtain permit coverage by submitting a NOI with
the Department, in conformance with Part I.G.. For construction activities subject to the
requirements of a regulated, traditional land use control MS4, the original owner or operator
must also notify the MS4, in writing, of the change in ownership at least 30 calendar days prior
to the change in ownership.
7.2 Owner’s/Operator’s Engineer’s Responsibilities
1. Prepare the SWPPP using good engineering practices, best management practices, and in
compliance with all federal, state, and local regulatory requirements.
2. Prepare the electronic Notice of Intent (eNOI) (see Appendix B) and sign the “SWPPP Preparer
Certification Form.” Forward the Owner/Operator Certification Form to the Owner/Operator for
signature.
3. Provide copies of the SWPPP to the Town of West Seneca once all signatures and attachments
are complete.
4. Enter Contractor’s information in Section 7.5 “SWPPP Participants” once a Contractor is
selected by the Owner/Operator.
5. Participate in a pre-construction meeting which shall include the Town of West Seneca
representative, Owner/Operator, Qualified Inspector, Contractor, and all subcontractors to
discuss responsibilities as they relate to the implementation of this SWPPP.
Stormwater Pollution Prevention Plan
Page 29
2241067
Page 447 of 1493
Page 448
6. Update the SWPPP each time there is a significant modification to the pollution prevention
measures or a change of the principal Contractor working on the project who may disturb site
soil.
7.3 Contractor's Responsibilities
1. Sign the SWPPP Contractor's Certification Form contained within Appendix B and forward to
the Owner’s/Operator’s Engineer for inclusion in the Site Log Book.
2. Identify at least one Trained Contractor that will be responsible for implementation of this
SWPPP. Ensure that at least one Trained Contractor is on site on a daily basis when soil
disturbance activities are being performed. The Trained Contractor shall inspect the erosion
and sediment control practices and pollution prevention measures being implemented within
the active work area daily to ensure that they are being maintained in effective operating
conditions at all times. For corrective actions not requiring engineering design, the contractor
must begin implementing corrective actions within one business day and complete the
corrective actions within five business days. For corrective actions requiring engineering
design, the engineering design process must begin within five business days and the
contractor must complete the corrective action in a reasonable time frame but no later than
60 calendar days.
3. Provide the names and addresses of all subcontractors working on the project site. Require all
subcontractors who will be involved with construction activities that will result in soil
disturbance to identify at least one Trained Contractor that will be on site on a daily basis when
soil disturbance activities are being performed; and to sign a copy of the Subcontractor’s
Certification Form contained within Appendix B, then forward to the Owner’s/Operator’s
Engineer for inclusion into the Site Log Book. This information must be retained as part of the
Site Log Book.
4. Maintain a Spill Prevention and Response Plan in accordance with requirements outlined in
Section 5 of this SWPPP. This plan shall be provided to the Owner’s/Operator’s Engineer for
inclusion in the Site Log Book, prior to mobilization on-site.
5. Participate in a pre-construction meeting which shall include the Town of West Seneca
representative, Owner/Operator, Owner’s/Operator’s Engineer, Qualified Inspector, and all
subcontractors to discuss responsibilities as they relate to the implementation of this SWPPP.
6. If Contractor plans on utilizing adjacent properties for material, waste, borrow, or equipment
storage areas, or if Contractor plans to engage in industrial activity other than construction
(such as operating asphalt and/or concrete plants) at the site, Contractor shall submit
appropriate documentation to the Owner’s/Operator’s Engineer so that the SWPPP can be
modified accordingly.
7. Implement site stabilization, erosion and sediment control measures, and other requirements
of the SWPPP.
8. In accordance with the requirements in the most current version of the NYS Standards and
Specifications for Erosion and Sediment Control, conduct inspections of erosion and sediment
control measures installed at the site to ensure that they remain in effective operating
condition at all times. Prepare and retain written documentation of inspections as well as of
Stormwater Pollution Prevention Plan
Page 30
2241067
Page 448 of 1493
Page 449
all repairs/maintenance activities performed. This information must be retained as part of the
Site Log Book.
9. Begin implementing corrective actions within one (1) business day of receipt of notification by
the Qualified Inspector/Qualified Professional of any corrective actions. For corrective actions
not requiring engineering design, the contractor must begin implementing corrective actions
within one business day and complete the corrective actions within five business days. For
corrective actions requiring engineering design, the engineering design process must begin
within five business days and the contractor must complete the corrective action in a
reasonable time frame but no later than 60 calendar days.
10. Maintain a record of the date(s) and location(s) that soil restoration is performed in accordance
with the accompanying plans and NYSDEC Division of Water’s publication “Deep-Ripping and
Decompaction,” dated April 2008. A copy of this publication is provided in Appendix H. The
record that is to be maintained shall be a copy of the overall site grading plan delineating the
area(s) and date(s) that the soil was restored.
11. Upon completion of all construction at the site, the contractor responsible for overall SWPPP
Compliance shall sign the certification on their Contractor Certification Form indicating that:
a.) all temporary erosion and sediment control measures have been removed from the site, b.)
the on-site soils disturbed by construction activity have been restored in accordance with the
SWPPP and the NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction,”
and c.) all permanent stormwater management practices required by the SWPPP have been
installed in accordance with the contract documents.
7.4 Qualified Inspector’s/Qualified Professional’s Responsibilities
1. Participate in a pre-construction meeting with the Town of West Seneca representative,
Owner/Operator, Owner/Operator’s Engineer, Contractor, and their subcontractors to discuss
responsibilities as they relate to the implementation of this SWPPP.
2. Conduct an initial assessment of the site prior to the commencement of construction and
certify in an inspection report that the appropriate erosion and sediment control measures
described within this SWPPP have been adequately installed and implemented to ensure
overall preparedness of the site.
3. Provide on-site inspections to determine compliance with the SWPPP. Site inspections shall
occur at an interval of at least once every seven calendar days. A written inspection report
shall be provided to the Owner/Operator and general contractor within one business day of
the completion of the inspection, with any deficiencies identified. A sample inspection form is
provided in Appendix F.
4. Prepare an inspection report subsequent to each and every inspection that shall
include/address the items listed in Part IV.C.4 of GP-0-25-001. Sign all inspection reports and
maintain on site with the SWPPP.
5. Notify the owner/operator and appropriate contractor or subcontractor of any corrective
actions that need to be taken.
Stormwater Pollution Prevention Plan
Page 31
2241067
Page 449 of 1493
Page 450
6. Prepare a construction Site Log Book to be used as a record of all inspection reports generated
throughout the duration of construction. Ensure that the construction Site Log Book is
maintained and kept up-to-date throughout the duration of construction.
7. Review the Contractor’s SWPPP records on a periodic basis to ensure compliance with the
requirements for daily reports, soil restoration, inspections, and maintenance logs.
8. Based on the as-built survey and material testing certifications performed by others, the
Qualified Professional shall perform evaluations of the completed stormwater management
practices to determine whether they were constructed in accordance with this SWPPP.
9. The Qualified Professional shall conduct a final site assessment and prepare a certification
letter to the Owner/Operator indicating that, upon review of the material testing and inspection
reports prepared by the firm retained by the Owner/Operator, review of the completed
topographic survey, and evaluation of the completed stormwater management facilities, the
stormwater management facilities have been constructed substantially in accordance with the
contract documents and should function as designed.
10. Prepare the Notice of Termination (NOT). The Qualified Professional shall sign the NOT
Certifications VI (Final Stabilization) and VII (Post-construction Stormwater Management
Practices) and forward the NOT to the Owner/Operator for signature on Certification VIII
(Owner/Operator Certification).
11. The owner’s or operator’s coverage is terminated as of the termination date indicated in the
Letter of Termination (LOT), which is sent by NYSDEC after a complete eNOT is submitted.
12. Transfer the SWPPP documents, along with all NOI's, LOA, permit certificates, NOT's, LOT,
construction Site Log Book, and written records required by the General Permit to the
Owner/Operator for archiving.
Stormwater Pollution Prevention Plan
Page 32
2241067
Page 450 of 1493
Page 451
7.5 SWPPP Participants
1. Owner’s/Operator’s Engineer 3: Kristopher Winkler, PE
LaBella Associates, DPC
300 Pearl Street, Suite 130
Buffalo, NY 14202
Phone: (716) 483-3153
2. Owner/Operator 4: Home Leasing
75 South Clinton Avenue, Suite 700,
Rochester, NY 14604
Phone: 585-262-6210
3. Contractor5,6: Name and Title:
Company Name:
Mailing Address:
Phone:
Fax:
3
Refer to Appendix B for the SWPPP Preparer Certification Form.
4
Refer to Appendix B for the Owner/Operator Certification Form.
5
Refer to Appendix B for Contractor and Subcontractor Certification Form.
6
Contractor’s information to be entered once the Contractor has been selected.
Stormwater Pollution Prevention Plan
Page 33
2241067
Page 451 of 1493
Page 452
Page 452 of 1493
Page 453
Appendix A :
FIGURES
A-1: Site Location Map
A-2: Soils Map
A-3: Historic Places Screening Map
A-4: Environmental Resource Map
A-5: Environmental Review Documentation
A-6: FEMA Firm Map
A-7: Pre-Development Watershed Delineation Map
A-8: Post-Development Watershed Delineation Map
Page 453 of 1493
Page 454
Page 454 of 1493
Page 455
HARLEM ROAD
D
R OA
EK
RE
G AC
YU
CA
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
PROJECT LOCATION
cts\92100-92199\92112.00 - CONFIDENTIAL - WOH Gross Wetland Violation\DWG\9
CLIN
TON
STR
EET
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:40 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SITE LOCATION MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-1
Page 455 of 1493
Page 456
Page 456 of 1493
Page 457
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:42 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS MAP 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2a
Page 457 of 1493
Page 458
Page 458 of 1493
Page 459
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appen
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:43 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS LEGEND -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2b
Page 459 of 1493
Page 460
Page 460 of 1493
Page 461
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:45 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS TABLE -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2c
Page 461 of 1493
Page 462
Page 462 of 1493
Page 463
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
Missing or invalid reference It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:45 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
SWPPP FIGURE - NOT FOR CONSTRUCTION
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
File: ..\references\A-3 Historic Places Screening Map (CRIS)\Titleblock - 8
DRAWING NAME:
date of such alteration, and a specific description of the alteration.
DRAWN BY: DATE: PROJECT NO.:
HISTORIC PLACES SCREENING MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-3
Page 463 of 1493
Page 464
Page 464 of 1493
Page 465
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:47 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
ENVIRONMENTAL RESOURCE MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-4
Page 465 of 1493
Page 466
Page 466 of 1493
Page 467
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appen
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:50 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
FEMA FIRM MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-5
Page 467 of 1493
Page 468
Page 468 of 1493
Page 469
Page 469 of 1493
Page 470
Page 470 of 1493
Page 471
Page 471 of 1493
Page 472
Page 472 of 1493
Page 473
Page 473 of 1493
Page 474
Page 474 of 1493
Page 475
AP-1
593.19
594.95
594.92 602.49
602.51
ES-1
ES-2
DS
DS
600.04
FLAG
POLE
MB
LEGEND
SUBCATCHMENT BOUNDARY
Tc PATH
# SUBCATCHMENT
# REACH
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:59:33 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and SWPPP FIGURE - NOT FOR CONSTRUCTION
N DRAWING NAME:
date of such alteration, and a specific description of the alteration.
DRAWN BY: DATE: PROJECT NO.:
PRE-DEVELOPMENT WATERSHED DELINEATION MAP 04/20/2026 2241067
VERSION 21.1
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2026 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON STREET, BUFFALO, NY 14224
A-6
Page 475 of 1493
Page 476
Page 476 of 1493
Page 477
AP-1
593.19
600.14
PS-7 599
600
601
PS-1
594.92 599 602.51
600
599
598
60
600
598
599
599
600
600
597
09098
597
598
599
1
600
6559
60
0
600
PS-6
600
600
598
599
599
600
600
595
596
597
598
600
600
PS-5
599
600599
FFE=600.75'
55 98765
600
60909
59
600 600
60
600
0
599
599
600
599
PS-2 599
59
599
9
599 599
599
595
596
598
597
600
600
598
599
598
599
599
DS
600
PS-3
DS
559998778
600
559
559999876
00 5599678
6
600
PS-4
59 559998766 PS-8
59
9 5599789 599.84
9
598
59 8
7 5
5965
59
595
598.87 9
59678
59 59
99
55595678
559 9998765
598
LEGEND
606.31 607.17
SUBCATCHMENT BOUNDARY
Tc PATH
# SUBCATCHMENT
# REACH
POND
#
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 11:02:52 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
N altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
POST-DEVELOPMENT WATERSHED DELINEATION MAP 04/20/2026 2241067
VERSION 21.1
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2026 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON STREET, BUFFALO, NY 14224
A-7
Page 477 of 1493
Page 478
Page 478 of 1493
Page 479
Appendix B :
FORMS
Notice of Intent (NOI) Draft
MS4 SWPPP Acceptance Form
SWPPP Preparer Certification Form
Owner/Operator Certification Form
Contractor and Subcontractor Certification Forms
Notice of Termination (NOT)
Page 479 of 1493
Page 480
Page 480 of 1493
Page 481
MS4 SWPPP Acceptance Form
for construction activities seeking authorization under the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI
and submitted to NYSDEC electronically.)
I. Project Owner/Operator Information
1. Owner/Operator Name:
2. Contact Person:
3. Street Address:
4. City/State/Zip:
II. Project Site Information
5. Project/Site Name:
6. Street Address:
7. City/State/Zip:
III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance Information
8. SWPPP Reviewed by:
9. Title/Position:
10. Date Final SWPPP Reviewed and Accepted:
IV. Regulated MS4 Information
11. Name of MS4 Operator:
12. MS4 SPDES Permit Identification Number: NYR20A
13. Street Address:
14. City/State/Zip:
15. Telephone Number:
Page 1 of 2
Page 481 of 1493
Page 482
MS4 SWPPP Acceptance Form - continued
V. Certification Statement - MS4 Official (principal executive officer or ranking elected official) or
Duly Authorized Representative
I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project
identified in section II. of this form has been reviewed and meets the substantive requirements in the
SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP).
Note: The MS4 Operator, through the acceptance of the SWPPP, assumes no responsibility for the
accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of
the SWPPP by the MS4 Operator does not relieve the owner/operator or their SWPPP preparer of
responsibility or liability for errors or omissions in the plan.
Printed Name1:
Title/Position:
Signature:
Date:
VI. Additional Information
1 Printed name of the principal executive officer or ranking elected official for the MS4 Operator or their
duly authorized representative in accordance with CGP Part VII.J.2.
(NYSDEC - MS4 SWPPP Acceptance Form - January 2025)
Page 2 of 2
Page 482 of 1493
Page 483
SWPPP Preparer Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and
submitted to NYSDEC electronically.)
Project/Site Name:
eNOI Submission ID:
Owner/Operator Name:
Certification Statement – SWPPP Preparer
I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) has been
prepared in accordance with the requirements of GP-0-25-001. I certify under penalty
of law that the SWPPP and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge
and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
SWPPP Preparer First Name MI SWPPP Preparer Last Name
Signature Date
Revised: January 2025
Page 483 of 1493
Page 484
Owner/Operator Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b. or Part I.F.2. and 3., the completed form must be attached to the eNOI or the
Request to Continue Coverage, and submitted to NYSDEC electronically.
Project/Site Name: ________________________________________________________
eNOI Submission ID: _________________________________________________
eNOI Submitted by: Owner/Operator SWPPP Preparer Other
Certification Statement - Owner/Operator
I hereby certify that I read, and will comply with, the GP-0-25-001 permit requirements. I understand that
authorization to discharge under the permit for the project/site named above is dependent on receipt of a
Letter of Authorization (LOA) or a Letter of Continued Coverage (LOCC) from the New York State
Department of Environmental Conservation (NYSDEC) in accordance with CGP Part I.D.3.b. or Part I.F.4.
I am aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.
Owner/Operator First Name MI Owner/Operator Last Name
___________________________________________________________
Signature
________________________________
Date
Revised: January 2025
Page 484 of 1493
Page 485
Stormwater Pollution Prevention Plan
Contractor Certification Statement
(Responsible for overall SWPPP Compliance)
West Seneca
Town of West Seneca, Erie County, New York
This is to certify that the following contracting firm will be responsible for installing, constructing, repairing, inspecting and/or
maintaining the erosion and sediment control practices and post-construction stormwater management control practices
required by the SWPPP.
Contracting Firm Information
Name:
Address:
Telephone & Fax:
Trained Contractor(s) 1 Responsible for SWPPP Implementation (Provide name, title, and date of last training)
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
Prior to commencement of construction activity, the following certification shall be issued:
I hereby certify under penalty of law that I understand and agree to comply with the requirements of the SWPPP and agree to
implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner
or operator must comply with the requirements of the most current version of the New York State Pollutant Discharge
Elimination System (SPDES) Construction General Permit (CGP) for Stormwater Discharges from Construction Activities and
that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that
there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine
and imprisonment for knowing violations
Printed Name:
Title/Position:
Signature: Date:
Upon completion of construction activities, the following certification shall be issued, prior to issuance of the NOT:
I hereby certify that that all permanent stormwater management practices required by the SWPPP have been installed in
accordance with the contract documents. I further certify that all temporary erosion and sediment control measures have
been removed from the site, and that the on-site soils disturbed by construction activity have been restored in accordance
with the SWPPP and the NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction”.
Printed Name:
Title/Position:
Signature: Date:
1 “Trained Contractor” means an employee from a contracting (construction) company that has received four (4) hours of Department endorsed training in proper erosion and sediment
control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the “trained contractor” shall receive four (4)
hours of training every three (3) years. It can also mean an employee from the contracting (construction) company that meets the “qualified inspector” qualifications (e.g. licensed
Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registe red Landscape Architect, provided they
have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil an d Water Conservation District, or other Department
endorsed entity). The “Trained Contractor” will be responsible for the day to day implementation of the SWPPP.
Page 485 of 1493
Page 486
Stormwater Pollution Prevention Plan
Subcontractor Certification Statement
(whose work involves soil disturbance)
West Seneca
Town of West Seneca, Erie County, New York
Each Subcontractor whose work will involve soil disturbance of any kind is required to complete and sign this Certification
Statement before commencing any construction activity at the site. This completed Certification Statement(s) shall be
maintained at the construction site in the Site Log Book.
Subcontracting Firm Information
Name:
Address:
Telephone & Fax:
Trained Contractor(s) 2 Responsible for SWPPP Implementation (Provide name, title, and date of last training)
Prior to commencement of construction activities, the following certification shall be issued:
I hereby certify under penalty of law that I understand and agree to comply with the requirements of the SWPPP and agree to
implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner
or operator must comply with the requirements of the most current version of the New York State Pollutant Discharge
Elimination System (SPDES) Construction General Permit (CGP) for Stormwater Discharges from Construction Activities and
that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that
there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine
and imprisonment for knowing violations
Printed Name:
Title/Position:
Signature: Date:
2 “Trained Contractor” means an employee from a contracting (construction) company that has received four (4) hours of Department endorsed training in proper erosion and sediment
control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the “trained contractor” shall receive four (4)
hours of training every three (3) years. It can also mean an employee from the contracting (construction) company that meets the “qualified inspector” qualifications (e.g. licensed
Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registe red Landscape Architect, provided they
have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil an d Water Conservation District, or other Department
endorsed entity). The “Trained Contractor” will be responsible for the day to day implementation of the SWPPP.
Page 486 of 1493
Page 487
eNOT Owner or Operator Certification
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I certify that I have met the requirements of CGP Part V.A.1., 2., 3., and 4. I certify under
penalty of law that this document and all attachments were prepared under my direction
or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for
knowing violations.
a. Printed name of the Owner or Operator:
b. Title/Position:
c. Signature:
d. Date:
Page 487 of 1493
Page 488
eNOT Qualified Inspector Certification – Final Stabilization
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.i., ii., and iii. or CGP Part
V.A.1.b.i., ii., and iii. have been achieved. I certify under penalty of law that this
document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting
false information, including the possibility of fine and imprisonment for knowing
violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 488 of 1493
Page 489
eNOT Qualified Inspector Certification – SMPs
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.iv. or CGP Part V.A.1.b.iv.
have been achieved. I certify under penalty of law that this document and all
attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 489 of 1493
Page 490
Page 490 of 1493
Page 491
Appendix c:
Project evaluation and
design calculations
Page 491 of 1493
Page 492
Page 492 of 1493
Page 493
P= 1.00 inch
Total Area Existing Imperv Proposed Imperv Existing Disturbed Imperv Reduction
AREA
(Acres) (Acres) (Acres) Imperv Area (Acres) (Acres)
TO ALTERNATIVE PRACTICES 2.13 0.47 1.91 0.47 0%
TO AREA REDUCTION SMPS
SITE REMAINING AREA 3.55 0.59 1.07 0.35 0%
TOTAL SITE 5.68 1.06 2.98 0.82 0%
Water Quality Volume Calculation
Exist Disturbed Imperv Imperv Area (NEW Percent TOTAL WQV
Total Area WQv WQv Adjusted
New Development / Redevelopment WQv Treatment % Area (REDEVELOPMENT) DEVELOPMENT) Impervious Rv REQUIRED System Generated Notes
(Acres) (ft 3 ) (ft 3 )
(Acres) (Acres) % (ft 3 )
REDEVELOPMENT ALTERNATIVE 75% 0.47 0.47 - 100% 0.95 1,621 1,216
NEW DEVELOPMENT ALTERNATIVE 100% 1.66 - 1.44 87% 0.83 5,006 5,006
8,672
REDEVELOPMENT REMAINING AREA 25% 0.35 0.35 - 100% 0.95 1,207 302
NEW DEVELOPMENT REMAINING AREA 100% 3.20 - 0.48 15% 0.19 2,149 2,149
Minimum Runoff Reduction Volume Calculation
Total Impervious Area Added Percent MINIMUM RRv
Weighted S
AREA (NEW DEVELOPMENT) Soil Group A % Soil Group B % Soil Group C % Soil Group D % Impervious Rv REQUIRED System Generated Notes
Factor 3
(Acres) % (ft )
TOTAL SITE 1.92 0% 0% 0% 100% 100% 0.95 0.20 1,324
Page 493 of 1493
Page 494
Page 494 of 1493
Page 495
Step 2 - Calculate Water Quality Volume
Is this project subject to Section 4.3 of the NYS Design Manual for Enhanced Phosphorus
Removal? No
What is the nature of this construction project? Redevelopment with increase in impervious area
Design Point: 1
Enter 90% Rainfall Event as P
P= 1.00 inches
Calculate Required WQv
Contributing Percent
Drainage Area Impervious Area WQv SMP
Area Impervious Rv
Number (Acres) (cf) Description
(Acres) %
Filtration
1 0.63 0.22 34 0.36 817
Bioretention
Flow Based
2 1.70 1.48 87 0.83 5,144 Alternative
Practice
Filtration
3 0.65 0.22 33 0.35 829
Bioretention
Filtration
4 0.68 0.48 71 0.69 1,692
Bioretention
Flow Based
5 0.43 0.43 100 0.95 1,483 Alternative
Practice
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Total 4.09 2.82 69 0.67 9964 Required WQv
Page 495 of 1493
Page 496
Page 496 of 1493
Page 497
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
1 0.63 0.22 34 0.36 817 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 340 sf
Enter Provided Filter Area Af 340 sf
Recalculated Water Quality Volume (based on
WQv calc 816 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 326 cf
This is the portion of the WQv that is not reduced in
WQv Treated 491 cf
the practice.
Page 497 of 1493
Page 498
Page 498 of 1493
Page 499
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
3 0.65 0.22 33 0.35 829 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 345 sf
Enter Provided Filter Area Af 348 sf
Recalculated Water Quality Volume (based on
WQv calc 835.2 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 334 cf
This is the portion of the WQv that is not reduced in
WQv Treated 495 cf
the practice.
Page 499 of 1493
Page 500
Page 500 of 1493
Page 501
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
4 0.68 0.48 71 0.69 1,692 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 705 sf
Enter Provided Filter Area Af 705 sf
Recalculated Water Quality Volume (based on
WQv calc 1692 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 677 cf
This is the portion of the WQv that is not reduced in
WQv Treated 1015 cf
the practice.
Page 501 of 1493
Page 502
Page 502 of 1493
Page 503
Water Quality Peak Flow Calclations
NYSDEC Water Quality Volume (WQv) & Water Quality Peak Flow (Qp) Calculation
Worksheet (REQUIRED Qp)
PROJECT INFORMATION
Total Drainage Area A: 2.09 ac
Impervious Area I: 1.90 ac
Percent Impervious 90.9 %
NYSDEC 90% Rainfall P: 1.00 in.
Time of Concentration Tc: 0.27 hrs
Rv: 0.87
WATER QUALITY VOLUME
Water Quality Volume WQv=([(P)*(Rv)*(A)]/12)*43560 WQv: 6,587 cf
WATER QUALITY PEAK FLOW (NEW DEVELOPMENT)
Runoff Volume Q=WQv/(A*3600) Q: 0.87 in.
2 ½
CN=1000/(10+5*P+10*Q-10(Q +1.25*Q*P) ) CN: 98.80
CN Rounded CN: 99
CN < or = 98 CN: 98
Initial Abstraction (Ia=200/CN-2) Ia: 0.04 in.
RATIO R=Ia/P R: 0.04
2
C0 = A*R +B*R +C C0: 2.54
2
C1 = A*R +B*R +C C1: -0.58
2
C2 = A*R +B*R +C C2: -0.17
2
Unit Peak Discharge qu=10^(C0+C1*Log(Tc)+C2*(log(Tc)) ) qu: 663.03 cfs/mi2/in
Water Quality Peak Flow Qp=qu*A*Q/640 (100%) Qp: 1.88 cfs
REDVELOPMENT
Impeverious Area Reduction IC 0.00 %
WQv Treatment by Standard Practice SP 0.00 %
Runoff Reduction RR 0.00 %
Req. WQv% By Alt. Practice AP=(25-(% IC+%SP+%RR))*3: AP 75.0 %
Required Water Quality Peak Flow RD QP=(Qp*AP): RD Qp: 1.41 cfs
Page 1 of 1
Page 503 of 1493
Page 504
Page 504 of 1493
Page 505
Appendix d:
Pre-development stormwater
modeling
Page 505 of 1493
Page 506
Page 506 of 1493
Page 507
ES-1
W Site
AP-1
Cayuga Creek
ES-2
E Site
Subcat Reach Pond Link Routing Diagram for D_App D_Pre-Development Model
Prepared by Labella Associates, Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC
Page 507 of 1493
Page 508
Page 508 of 1493
Page 509
D_App D_Pre-Development Model
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing (selected events)
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-yr NY-West Seneca 24-hr S1 1-yr Default 24.00 1 1.82 2
2 10-yr NY-West Seneca 24-hr S1 10-yr Default 24.00 1 3.14 2
3 100-yr NY-West Seneca 24-hr S1 100-yr Default 24.00 1 5.22 2
Page 509 of 1493
Page 510
D_App D_Pre-Development Model
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (selected nodes)
Area CN Description
(acres) (subcatchment-numbers)
10.061 80 >75% Grass cover, Good, HSG D (ES-1, ES-2)
1.056 98 Paved parking, HSG D (ES-1, ES-2)
11.117 82 TOTAL AREA
Page 510 of 1493
Page 511
D_App D_Pre-Development Model
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (selected nodes)
Area Soil Subcatchment
(acres) Group Numbers
0.000 HSG A
0.000 HSG B
0.000 HSG C
11.117 HSG D ES-1, ES-2
0.000 Other
11.117 TOTAL AREA
Page 511 of 1493
Page 512
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 5
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=0.53"
Flow Length=391' Tc=14.0 min CN=82 Runoff=4.22 cfs 0.344 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=0.49"
Flow Length=390' Tc=19.4 min CN=81 Runoff=1.42 cfs 0.139 af
Reach AP-1: Cayuga Creek Inflow=5.48 cfs 0.483 af
Outflow=5.48 cfs 0.483 af
Total Runoff Area = 11.117 ac Runoff Volume = 0.483 af Average Runoff Depth = 0.52"
90.50% Pervious = 10.061 ac 9.50% Impervious = 1.056 ac
Page 512 of 1493
Page 513
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 6
Summary for Subcatchment ES-1: W Site
Runoff = 4.22 cfs @ 12.16 hrs, Volume= 0.344 af, Depth= 0.53"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
Runoff
4.22 cfs
NY-West Seneca 24-hr S1 1-yr
4
Rainfall=1.82"
Runoff Area=337,194 sf
Runoff Volume=0.344 af
3
Runoff Depth=0.53"
Flow (cfs)
Flow Length=391'
Tc=14.0 min
2
CN=82
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 513 of 1493
Page 514
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment ES-2: E Site
Runoff = 1.42 cfs @ 12.25 hrs, Volume= 0.139 af, Depth= 0.49"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
1.42 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
Runoff Area=147,058 sf
Runoff Volume=0.139 af
1
Runoff Depth=0.49"
Flow (cfs)
Flow Length=390'
Tc=19.4 min
CN=81
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 514 of 1493
Page 515
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Reach AP-1: Cayuga Creek
Inflow Area = 11.117 ac, 9.50% Impervious, Inflow Depth = 0.52" for 1-yr event
Inflow = 5.48 cfs @ 12.18 hrs, Volume= 0.483 af
Outflow = 5.48 cfs @ 12.18 hrs, Volume= 0.483 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
5.48 cfs Outflow
6 5.48 cfs
Inflow Area=11.117 ac
5
4
Flow (cfs)
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 515 of 1493
Page 516
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 9
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=1.49"
Flow Length=391' Tc=14.0 min CN=82 Runoff=12.32 cfs 0.961 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=1.42"
Flow Length=390' Tc=19.4 min CN=81 Runoff=4.40 cfs 0.400 af
Reach AP-1: Cayuga Creek Inflow=16.27 cfs 1.361 af
Outflow=16.27 cfs 1.361 af
Total Runoff Area = 11.117 ac Runoff Volume = 1.361 af Average Runoff Depth = 1.47"
90.50% Pervious = 10.061 ac 9.50% Impervious = 1.056 ac
Page 516 of 1493
Page 517
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment ES-1: W Site
Runoff = 12.32 cfs @ 12.15 hrs, Volume= 0.961 af, Depth= 1.49"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
Runoff
13 12.32 cfs
12 NY-West Seneca 24-hr S1 10-yr
11 Rainfall=3.14"
10
Runoff Area=337,194 sf
Runoff Volume=0.961 af
9
Runoff Depth=1.49"
8
Flow (cfs)
Flow Length=391'
7
Tc=14.0 min
6
CN=82
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 517 of 1493
Page 518
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment ES-2: E Site
Runoff = 4.40 cfs @ 12.23 hrs, Volume= 0.400 af, Depth= 1.42"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
4.40 cfs
NY-West Seneca 24-hr S1 10-yr
4 Rainfall=3.14"
Runoff Area=147,058 sf
Runoff Volume=0.400 af
3 Runoff Depth=1.42"
Flow (cfs)
Flow Length=390'
Tc=19.4 min
2 CN=81
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 518 of 1493
Page 519
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 12
Summary for Reach AP-1: Cayuga Creek
Inflow Area = 11.117 ac, 9.50% Impervious, Inflow Depth = 1.47" for 10-yr event
Inflow = 16.27 cfs @ 12.17 hrs, Volume= 1.361 af
Outflow = 16.27 cfs @ 12.17 hrs, Volume= 1.361 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
18 16.27 cfs Outflow
16.27 cfs
17
16
Inflow Area=11.117 ac
15
14
13
12
11
Flow (cfs)
10
9
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 519 of 1493
Page 520
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 13
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=3.28"
Flow Length=391' Tc=14.0 min CN=82 Runoff=27.59 cfs 2.114 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=3.18"
Flow Length=390' Tc=19.4 min CN=81 Runoff=10.17 cfs 0.895 af
Reach AP-1: Cayuga Creek Inflow=36.80 cfs 3.008 af
Outflow=36.80 cfs 3.008 af
Total Runoff Area = 11.117 ac Runoff Volume = 3.008 af Average Runoff Depth = 3.25"
90.50% Pervious = 10.061 ac 9.50% Impervious = 1.056 ac
Page 520 of 1493
Page 521
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 14
Summary for Subcatchment ES-1: W Site
Runoff = 27.59 cfs @ 12.15 hrs, Volume= 2.114 af, Depth= 3.28"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
30 Runoff
27.59 cfs
28
NY-West Seneca 24-hr S1 100-yr
26
Rainfall=5.22"
24
Runoff Area=337,194 sf
22
Runoff Volume=2.114 af
20
Runoff Depth=3.28"
18
Flow Length=391'
Flow (cfs)
16
Tc=14.0 min
14
CN=82
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 521 of 1493
Page 522
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 15
Summary for Subcatchment ES-2: E Site
Runoff = 10.17 cfs @ 12.22 hrs, Volume= 0.895 af, Depth= 3.18"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
11 10.17 cfs
10 NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
9
Runoff Area=147,058 sf
8 Runoff Volume=0.895 af
7 Runoff Depth=3.18"
Flow Length=390'
Flow (cfs)
6
Tc=19.4 min
5 CN=81
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 522 of 1493
Page 523
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 16
Summary for Reach AP-1: Cayuga Creek
Inflow Area = 11.117 ac, 9.50% Impervious, Inflow Depth = 3.25" for 100-yr event
Inflow = 36.80 cfs @ 12.16 hrs, Volume= 3.008 af
Outflow = 36.80 cfs @ 12.16 hrs, Volume= 3.008 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
36.80 cfs Outflow
40 36.80 cfs
38
36
Inflow Area=11.117 ac
34
32
30
28
26
24
Flow (cfs)
22
20
18
16
14
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 523 of 1493
Page 524
D_App D_Pre-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 17
Events for Subcatchment ES-1: W Site
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 4.22 0.344 0.53
10-yr 3.14 12.32 0.961 1.49
100-yr 5.22 27.59 2.114 3.28
Page 524 of 1493
Page 525
D_App D_Pre-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 18
Events for Subcatchment ES-2: E Site
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 1.42 0.139 0.49
10-yr 3.14 4.40 0.400 1.42
100-yr 5.22 10.17 0.895 3.18
Page 525 of 1493
Page 526
D_App D_Pre-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 19
Events for Reach AP-1: Cayuga Creek
Event Inflow Outflow Elevation Storage
(cfs) (cfs) (feet) (cubic-feet)
1-yr 5.48 5.48 0.00 0
10-yr 16.27 16.27 0.00 0
100-yr 36.80 36.80 0.00 0
Page 526 of 1493
Page 527
Appendix e:
Post development stormwater
modeling
Page 527 of 1493
Page 528
Page 528 of 1493
Page 529
PS-1 BIO-1
Filtration Bioretention
PS-6
PS-2
CH-1 DP-1 PS-7
Chambers Design Point
PS-5
PS-8
PS-3 BIO-2
Filtration Bioretention
PS-4 BIO-3
Filtration Bioretention
Subcat Reach Pond Link Routing Diagram for E_App E_Post-Development Model
Prepared by Labella Associates, Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC
Page 529 of 1493
Page 530
E_App E_Post-Development Model
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing (selected events)
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-yr NY-West Seneca 24-hr S1 1-yr Default 24.00 1 1.82 2
2 10-yr NY-West Seneca 24-hr S1 10-yr Default 24.00 1 3.14 2
3 100-yr NY-West Seneca 24-hr S1 100-yr Default 24.00 1 5.22 2
Page 530 of 1493
Page 531
E_App E_Post-Development Model
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (selected nodes)
Area CN Description
(acres) (subcatchment-numbers)
8.107 80 >75% Grass cover, Good, HSG D (PS-1, PS-2, PS-3, PS-4, PS-7, PS-8)
2.967 98 Paved parking, HSG D (PS-1, PS-2, PS-3, PS-4, PS-5, PS-6)
11.074 85 TOTAL AREA
Page 531 of 1493
Page 532
E_App E_Post-Development Model
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (selected nodes)
Area Soil Subcatchment
(acres) Group Numbers
0.000 HSG A
0.000 HSG B
0.000 HSG C
11.074 HSG D PS-1, PS-2, PS-3, PS-4, PS-5, PS-6, PS-7, PS-8
0.000 Other
11.074 TOTAL AREA
Page 532 of 1493
Page 533
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 5
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=27,596 sf 33.98% Impervious Runoff Depth=0.72"
Tc=6.0 min CN=86 Runoff=0.72 cfs 0.038 af
Subcatchment PS-2: Runoff Area=72,316 sf 88.61% Impervious Runoff Depth=1.40"
Tc=6.0 min CN=96 Runoff=3.74 cfs 0.194 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=0.72"
Tc=6.0 min CN=86 Runoff=0.74 cfs 0.039 af
Subcatchment PS-4: Runoff Area=29,485 sf 70.98% Impervious Runoff Depth=1.15"
Tc=6.0 min CN=93 Runoff=1.28 cfs 0.065 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=1.60"
Tc=6.0 min CN=98 Runoff=1.06 cfs 0.057 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=1.60"
Tc=6.0 min CN=98 Runoff=0.37 cfs 0.020 af
Subcatchment PS-7: Runoff Area=245,856 sf 0.00% Impervious Runoff Depth=0.46"
Flow Length=391' Tc=14.0 min CN=80 Runoff=2.49 cfs 0.215 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=0.46"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=0.40 cfs 0.047 af
Reach DP-1: Design Point Inflow=4.12 cfs 0.674 af
Outflow=4.12 cfs 0.674 af
Pond BIO-1: Filtration Bioretention Peak Elev=598.98' Storage=994 cf Inflow=0.72 cfs 0.038 af
Primary=0.02 cfs 0.038 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.02 cfs 0.038 af
Pond BIO-2: Filtration Bioretention Peak Elev=596.95' Storage=1,010 cf Inflow=0.74 cfs 0.039 af
Primary=0.02 cfs 0.039 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.02 cfs 0.039 af
Pond BIO-3: Filtration Bioretention Peak Elev=595.92' Storage=1,729 cf Inflow=1.28 cfs 0.065 af
Primary=0.04 cfs 0.065 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.04 cfs 0.065 af
Pond CH-1: Chambers Peak Elev=592.38' Storage=0.079 af Inflow=4.80 cfs 0.251 af
8.0" Round Culvert n=0.013 L=25.0' S=0.0100 '/' Outflow=1.18 cfs 0.251 af
Total Runoff Area = 11.074 ac Runoff Volume = 0.674 af Average Runoff Depth = 0.73"
73.21% Pervious = 8.107 ac 26.79% Impervious = 2.967 ac
Page 533 of 1493
Page 534
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 6
Summary for Subcatchment PS-1:
Runoff = 0.72 cfs @ 12.04 hrs, Volume= 0.038 af, Depth= 0.72"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
9,376 98 Paved parking, HSG D
18,220 80 >75% Grass cover, Good, HSG D
27,596 86 Weighted Average
18,220 66.02% Pervious Area
9,376 33.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
0.8 Runoff
0.75
0.72 cfs
0.7 NY-West Seneca 24-hr S1 1-yr
0.65 Rainfall=1.82"
0.6 Runoff Area=27,596 sf
0.55 Runoff Volume=0.038 af
0.5 Runoff Depth=0.72"
Flow (cfs)
0.45 Tc=6.0 min
0.4
CN=86
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 534 of 1493
Page 535
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment PS-2:
Runoff = 3.74 cfs @ 12.04 hrs, Volume= 0.194 af, Depth= 1.40"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
64,081 98 Paved parking, HSG D
8,235 80 >75% Grass cover, Good, HSG D
72,316 96 Weighted Average
8,235 11.39% Pervious Area
64,081 88.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
Runoff
4 3.74 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
3
Runoff Area=72,316 sf
Runoff Volume=0.194 af
Runoff Depth=1.40"
Flow (cfs)
Tc=6.0 min
2
CN=96
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 535 of 1493
Page 536
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment PS-3:
Runoff = 0.74 cfs @ 12.04 hrs, Volume= 0.039 af, Depth= 0.72"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
0.8 Runoff
0.74 cfs
0.75
NY-West Seneca 24-hr S1 1-yr
0.7
Rainfall=1.82"
0.65
0.6
Runoff Area=28,267 sf
0.55 Runoff Volume=0.039 af
0.5 Runoff Depth=0.72"
Flow (cfs)
0.45 Tc=6.0 min
0.4 CN=86
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 536 of 1493
Page 537
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 9
Summary for Subcatchment PS-4:
Runoff = 1.28 cfs @ 12.04 hrs, Volume= 0.065 af, Depth= 1.15"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
8,557 80 >75% Grass cover, Good, HSG D
29,485 93 Weighted Average
8,557 29.02% Pervious Area
20,928 70.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
1.28 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
Runoff Area=29,485 sf
1
Runoff Volume=0.065 af
Runoff Depth=1.15"
Flow (cfs)
Tc=6.0 min
CN=93
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 537 of 1493
Page 538
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment PS-5:
Runoff = 1.06 cfs @ 12.04 hrs, Volume= 0.057 af, Depth= 1.60"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
1.06 cfs
NY-West Seneca 24-hr S1 1-yr
1
Rainfall=1.82"
Runoff Area=18,756 sf
Runoff Volume=0.057 af
Runoff Depth=1.60"
Flow (cfs)
Tc=6.0 min
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 538 of 1493
Page 539
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment PS-6:
Runoff = 0.37 cfs @ 12.04 hrs, Volume= 0.020 af, Depth= 1.60"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
0.4 0.37 cfs
0.38
0.36
NY-West Seneca 24-hr S1 1-yr
0.34 Rainfall=1.82"
0.32
Runoff Area=6,622 sf
0.3
0.28 Runoff Volume=0.020 af
0.26 Runoff Depth=1.60"
0.24
Flow (cfs)
0.22
Tc=6.0 min
0.2 CN=98
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 539 of 1493
Page 540
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 12
Summary for Subcatchment PS-7:
Runoff = 2.49 cfs @ 12.17 hrs, Volume= 0.215 af, Depth= 0.46"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
245,856 80 >75% Grass cover, Good, HSG D
245,856 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
Runoff
2.49 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
2
Runoff Area=245,856 sf
Runoff Volume=0.215 af
Runoff Depth=0.46"
Flow (cfs)
Flow Length=391'
Tc=14.0 min
1
CN=80
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 540 of 1493
Page 541
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 13
Summary for Subcatchment PS-8:
Runoff = 0.40 cfs @ 12.36 hrs, Volume= 0.047 af, Depth= 0.46"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
0.44 Runoff
0.42
0.40 cfs
0.4 NY-West Seneca 24-hr S1 1-yr
0.38
0.36 Rainfall=1.82"
0.34 Runoff Area=53,474 sf
0.32
0.3 Runoff Volume=0.047 af
0.28 Runoff Depth=0.46"
0.26
Flow (cfs)
0.24 Flow Length=821'
0.22 Slope=0.0100 '/'
0.2
0.18 Tc=25.7 min
0.16 CN=80
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 541 of 1493
Page 542
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 14
Summary for Reach DP-1: Design Point
Inflow Area = 11.074 ac, 26.79% Impervious, Inflow Depth = 0.73" for 1-yr event
Inflow = 4.12 cfs @ 12.18 hrs, Volume= 0.674 af
Outflow = 4.12 cfs @ 12.18 hrs, Volume= 0.674 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
4.12 cfs Outflow
4.12 cfs
Inflow Area=11.074 ac
4
3
Flow (cfs)
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 542 of 1493
Page 543
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 15
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.634 ac, 33.98% Impervious, Inflow Depth = 0.72" for 1-yr event
Inflow = 0.72 cfs @ 12.04 hrs, Volume= 0.038 af
Outflow = 0.02 cfs @ 15.87 hrs, Volume= 0.038 af, Atten= 97%, Lag= 229.9 min
Primary = 0.02 cfs @ 15.87 hrs, Volume= 0.038 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 598.98' @ 15.87 hrs Surf.Area= 1,679 sf Storage= 994 cf
Flood Elev= 600.00' Surf.Area= 2,500 sf Storage= 3,120 cf
Plug-Flow detention time= 645.9 min calculated for 0.038 af (100% of inflow)
Center-of-Mass det. time= 646.0 min ( 1,495.6 - 849.7 )
Volume Invert Avail.Storage Storage Description
#1 598.00' 3,120 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
598.00 340 0 0
599.00 1,700 1,020 1,020
600.00 2,500 2,100 3,120
Device Routing Invert Outlet Devices
#1 Primary 598.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 15.87 hrs HW=598.98' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.00 cfs of 5.10 cfs potential flow)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 543 of 1493
Page 544
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 16
Pond BIO-1: Filtration Bioretention
Hydrograph
0.72 cfs Inflow
Outflow
Inflow Area=0.634 ac Primary
Secondary
Tertiary
0.8
0.75
Peak Elev=598.98'
0.7 Storage=994 cf
0.65
0.6
0.55
0.5
Flow (cfs)
0.45
0.4
0.35
0.3
0.25
0.2 0.02 cfs
0.15 0.02 cfs
0.1 0.00 cfs
0.00 cfs
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 544 of 1493
Page 545
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 17
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 0.72" for 1-yr event
Inflow = 0.74 cfs @ 12.04 hrs, Volume= 0.039 af
Outflow = 0.02 cfs @ 15.70 hrs, Volume= 0.039 af, Atten= 97%, Lag= 219.6 min
Primary = 0.02 cfs @ 15.70 hrs, Volume= 0.039 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.95' @ 15.70 hrs Surf.Area= 1,776 sf Storage= 1,010 cf
Flood Elev= 598.00' Surf.Area= 2,630 sf Storage= 3,339 cf
Plug-Flow detention time= 621.3 min calculated for 0.039 af (100% of inflow)
Center-of-Mass det. time= 621.4 min ( 1,471.1 - 849.7 )
Volume Invert Avail.Storage Storage Description
#1 596.00' 3,339 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
596.00 348 0 0
597.00 1,850 1,099 1,099
598.00 2,630 2,240 3,339
Device Routing Invert Outlet Devices
#1 Primary 596.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 15.70 hrs HW=596.95' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.00 cfs of 4.75 cfs potential flow)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 545 of 1493
Page 546
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 18
Pond BIO-2: Filtration Bioretention
Hydrograph
0.74 cfs Inflow
Outflow
Inflow Area=0.649 ac Primary
Secondary
Tertiary
0.8 Peak Elev=596.95'
0.75
0.7 Storage=1,010 cf
0.65
0.6
0.55
0.5
Flow (cfs)
0.45
0.4
0.35
0.3
0.25
0.2 0.02 cfs
0.15 0.02 cfs
0.1 0.00 cfs
0.00 cfs
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 546 of 1493
Page 547
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 19
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.677 ac, 70.98% Impervious, Inflow Depth = 1.15" for 1-yr event
Inflow = 1.28 cfs @ 12.04 hrs, Volume= 0.065 af
Outflow = 0.04 cfs @ 14.68 hrs, Volume= 0.065 af, Atten= 97%, Lag= 158.5 min
Primary = 0.04 cfs @ 14.68 hrs, Volume= 0.065 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 595.92' @ 14.68 hrs Surf.Area= 3,049 sf Storage= 1,729 cf
Flood Elev= 597.00' Surf.Area= 3,978 sf Storage= 5,592 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 587.3 min ( 1,401.4 - 814.2 )
Volume Invert Avail.Storage Storage Description
#1 595.00' 5,592 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
595.00 705 0 0
596.00 3,250 1,978 1,978
597.00 3,978 3,614 5,592
Device Routing Invert Outlet Devices
#1 Primary 595.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.04 cfs @ 14.68 hrs HW=595.92' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.00 cfs of 5.10 cfs potential flow)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 547 of 1493
Page 548
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 20
Pond BIO-3: Filtration Bioretention
Hydrograph
1.28 cfs Inflow
Outflow
Inflow Area=0.677 ac Primary
Secondary
Tertiary
Peak Elev=595.92'
Storage=1,729 cf
1
Flow (cfs)
0.04 cfs
0.04 cfs
0.00 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 548 of 1493
Page 549
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 21
Summary for Pond CH-1: Chambers
Inflow Area = 2.091 ac, 90.96% Impervious, Inflow Depth = 1.44" for 1-yr event
Inflow = 4.80 cfs @ 12.04 hrs, Volume= 0.251 af
Outflow = 1.18 cfs @ 12.29 hrs, Volume= 0.251 af, Atten= 75%, Lag= 15.4 min
Primary = 1.18 cfs @ 12.29 hrs, Volume= 0.251 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 592.38' @ 12.29 hrs Surf.Area= 0.127 ac Storage= 0.079 af
Flood Elev= 598.32' Surf.Area= 0.127 ac Storage= 0.433 af
Plug-Flow detention time= 60.5 min calculated for 0.251 af (100% of inflow)
Center-of-Mass det. time= 60.2 min ( 847.2 - 787.0 )
Volume Invert Avail.Storage Storage Description
#1A 591.25' 0.177 af 37.08'W x 149.10'L x 5.50'H Field A
0.698 af Overall - 0.256 af Embedded = 0.442 af x 40.0% Voids
#2A 592.00' 0.256 af ADS_StormTech MC-3500 d +Cap x 100 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
100 Chambers in 5 Rows
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
0.433 af Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
#1 Primary 591.25' 8.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.25' / 591.00' S= 0.0100 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=1.18 cfs @ 12.29 hrs HW=592.38' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 1.18 cfs @ 3.38 fps)
Page 549 of 1493
Page 550
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 22
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
5 Rows x 77.0" Wide + 9.0" Spacing x 4 + 12.0" Side Stone x 2 = 37.08' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
100 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 5 Rows = 11,144.2 cf Chamber Storage
30,410.2 cf Field - 11,144.2 cf Chambers = 19,266.0 cf Stone x 40.0% Voids = 7,706.4 cf Stone Storage
Chamber Storage + Stone Storage = 18,850.6 cf = 0.433 af
Overall Storage Efficiency = 62.0%
Overall System Size = 149.10' x 37.08' x 5.50'
100 Chambers
1,126.3 cy Field
713.6 cy Stone
Page 550 of 1493
Page 551
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 23
Pond CH-1: Chambers
Hydrograph
Inflow
4.80 cfs Primary
5
Inflow Area=2.091 ac
Peak Elev=592.38'
4
Storage=0.079 af
8.0"
Flow (cfs)
3
Round Culvert
n=0.013
2
L=25.0'
1.18 cfs
S=0.0100 '/'
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 551 of 1493
Page 552
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 24
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=27,596 sf 33.98% Impervious Runoff Depth=1.78"
Tc=6.0 min CN=86 Runoff=1.71 cfs 0.094 af
Subcatchment PS-2: Runoff Area=72,316 sf 88.61% Impervious Runoff Depth=2.69"
Tc=6.0 min CN=96 Runoff=6.39 cfs 0.372 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=1.78"
Tc=6.0 min CN=86 Runoff=1.75 cfs 0.096 af
Subcatchment PS-4: Runoff Area=29,485 sf 70.98% Impervious Runoff Depth=2.39"
Tc=6.0 min CN=93 Runoff=2.39 cfs 0.135 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=2.91"
Tc=6.0 min CN=98 Runoff=1.72 cfs 0.104 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=2.91"
Tc=6.0 min CN=98 Runoff=0.61 cfs 0.037 af
Subcatchment PS-7: Runoff Area=245,856 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=391' Tc=14.0 min CN=80 Runoff=8.08 cfs 0.638 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=1.32 cfs 0.139 af
Reach DP-1: Design Point Inflow=13.96 cfs 1.615 af
Outflow=13.96 cfs 1.615 af
Pond BIO-1: Filtration Bioretention Peak Elev=599.12' Storage=1,232 cf Inflow=1.71 cfs 0.094 af
Primary=0.02 cfs 0.045 af Secondary=1.10 cfs 0.049 af Tertiary=0.00 cfs 0.000 af Outflow=1.12 cfs 0.094 af
Pond BIO-2: Filtration Bioretention Peak Elev=597.12' Storage=1,319 cf Inflow=1.75 cfs 0.096 af
Primary=0.02 cfs 0.048 af Secondary=1.04 cfs 0.048 af Tertiary=0.00 cfs 0.000 af Outflow=1.06 cfs 0.096 af
Pond BIO-3: Filtration Bioretention Peak Elev=596.12' Storage=2,359 cf Inflow=2.39 cfs 0.135 af
Primary=0.04 cfs 0.084 af Secondary=1.03 cfs 0.050 af Tertiary=0.00 cfs 0.000 af Outflow=1.07 cfs 0.135 af
Pond CH-1: Chambers Peak Elev=593.15' Storage=0.161 af Inflow=8.11 cfs 0.476 af
8.0" Round Culvert n=0.013 L=25.0' S=0.0100 '/' Outflow=1.66 cfs 0.476 af
Total Runoff Area = 11.074 ac Runoff Volume = 1.615 af Average Runoff Depth = 1.75"
73.21% Pervious = 8.107 ac 26.79% Impervious = 2.967 ac
Page 552 of 1493
Page 553
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 25
Summary for Subcatchment PS-1:
Runoff = 1.71 cfs @ 12.04 hrs, Volume= 0.094 af, Depth= 1.78"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
9,376 98 Paved parking, HSG D
18,220 80 >75% Grass cover, Good, HSG D
27,596 86 Weighted Average
18,220 66.02% Pervious Area
9,376 33.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
Runoff
1.71 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=27,596 sf
Runoff Volume=0.094 af
Runoff Depth=1.78"
Flow (cfs)
1
Tc=6.0 min
CN=86
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 553 of 1493
Page 554
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 26
Summary for Subcatchment PS-2:
Runoff = 6.39 cfs @ 12.04 hrs, Volume= 0.372 af, Depth= 2.69"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
64,081 98 Paved parking, HSG D
8,235 80 >75% Grass cover, Good, HSG D
72,316 96 Weighted Average
8,235 11.39% Pervious Area
64,081 88.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
7 Runoff
6.39 cfs
NY-West Seneca 24-hr S1 10-yr
6
Rainfall=3.14"
Runoff Area=72,316 sf
5
Runoff Volume=0.372 af
Runoff Depth=2.69"
Flow (cfs)
4
Tc=6.0 min
CN=96
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 554 of 1493
Page 555
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 27
Summary for Subcatchment PS-3:
Runoff = 1.75 cfs @ 12.04 hrs, Volume= 0.096 af, Depth= 1.78"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
Runoff
1.75 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=28,267 sf
Runoff Volume=0.096 af
Runoff Depth=1.78"
Flow (cfs)
Tc=6.0 min
1
CN=86
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 555 of 1493
Page 556
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 28
Summary for Subcatchment PS-4:
Runoff = 2.39 cfs @ 12.04 hrs, Volume= 0.135 af, Depth= 2.39"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
8,557 80 >75% Grass cover, Good, HSG D
29,485 93 Weighted Average
8,557 29.02% Pervious Area
20,928 70.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
2.39 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
2 Runoff Area=29,485 sf
Runoff Volume=0.135 af
Runoff Depth=2.39"
Flow (cfs)
Tc=6.0 min
CN=93
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 556 of 1493
Page 557
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 29
Summary for Subcatchment PS-5:
Runoff = 1.72 cfs @ 12.04 hrs, Volume= 0.104 af, Depth= 2.91"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
1.72 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=18,756 sf
Runoff Volume=0.104 af
Runoff Depth=2.91"
Flow (cfs)
1
Tc=6.0 min
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 557 of 1493
Page 558
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 30
Summary for Subcatchment PS-6:
Runoff = 0.61 cfs @ 12.04 hrs, Volume= 0.037 af, Depth= 2.91"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
0.65 0.61 cfs
0.6 NY-West Seneca 24-hr S1 10-yr
0.55 Rainfall=3.14"
0.5 Runoff Area=6,622 sf
0.45 Runoff Volume=0.037 af
0.4
Runoff Depth=2.91"
Flow (cfs)
Tc=6.0 min
0.35
CN=98
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 558 of 1493
Page 559
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 31
Summary for Subcatchment PS-7:
Runoff = 8.08 cfs @ 12.15 hrs, Volume= 0.638 af, Depth= 1.36"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
245,856 80 >75% Grass cover, Good, HSG D
245,856 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
9 Runoff
8.08 cfs
8 NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
7
Runoff Area=245,856 sf
6 Runoff Volume=0.638 af
Runoff Depth=1.36"
Flow (cfs)
5 Flow Length=391'
Tc=14.0 min
4
CN=80
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 559 of 1493
Page 560
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 32
Summary for Subcatchment PS-8:
Runoff = 1.32 cfs @ 12.32 hrs, Volume= 0.139 af, Depth= 1.36"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
Runoff
1.32 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=53,474 sf
1 Runoff Volume=0.139 af
Runoff Depth=1.36"
Flow (cfs)
Flow Length=821'
Slope=0.0100 '/'
Tc=25.7 min
CN=80
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 560 of 1493
Page 561
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 33
Summary for Reach DP-1: Design Point
Inflow Area = 11.074 ac, 26.79% Impervious, Inflow Depth = 1.75" for 10-yr event
Inflow = 13.96 cfs @ 12.15 hrs, Volume= 1.615 af
Outflow = 13.96 cfs @ 12.15 hrs, Volume= 1.615 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
13.96 cfs Outflow
15 13.96 cfs
14 Inflow Area=11.074 ac
13
12
11
10
9
Flow (cfs)
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 561 of 1493
Page 562
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 34
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.634 ac, 33.98% Impervious, Inflow Depth = 1.78" for 10-yr event
Inflow = 1.71 cfs @ 12.04 hrs, Volume= 0.094 af
Outflow = 1.12 cfs @ 12.12 hrs, Volume= 0.094 af, Atten= 34%, Lag= 4.6 min
Primary = 0.02 cfs @ 12.12 hrs, Volume= 0.045 af
Routed to Reach DP-1 : Design Point
Secondary = 1.10 cfs @ 12.12 hrs, Volume= 0.049 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 599.12' @ 12.12 hrs Surf.Area= 1,797 sf Storage= 1,232 cf
Flood Elev= 600.00' Surf.Area= 2,500 sf Storage= 3,120 cf
Plug-Flow detention time= 326.2 min calculated for 0.094 af (100% of inflow)
Center-of-Mass det. time= 326.4 min ( 1,148.5 - 822.1 )
Volume Invert Avail.Storage Storage Description
#1 598.00' 3,120 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
598.00 340 0 0
599.00 1,700 1,020 1,020
600.00 2,500 2,100 3,120
Device Routing Invert Outlet Devices
#1 Primary 598.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.12 hrs HW=599.12' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=1.10 cfs @ 12.12 hrs HW=599.12' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 1.10 cfs of 6.00 cfs potential flow)
2=Overflow Grate (Weir Controls 1.10 cfs @ 1.14 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 562 of 1493
Page 563
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 35
Pond BIO-1: Filtration Bioretention
Hydrograph
1.71 cfs Inflow
Outflow
Inflow Area=0.634 ac Primary
Secondary
Tertiary
Peak Elev=599.12'
Storage=1,232 cf
1.12 cfs
1.10 cfs
Flow (cfs)
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 563 of 1493
Page 564
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 36
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 1.78" for 10-yr event
Inflow = 1.75 cfs @ 12.04 hrs, Volume= 0.096 af
Outflow = 1.06 cfs @ 12.13 hrs, Volume= 0.096 af, Atten= 39%, Lag= 5.6 min
Primary = 0.02 cfs @ 12.13 hrs, Volume= 0.048 af
Routed to Reach DP-1 : Design Point
Secondary = 1.04 cfs @ 12.13 hrs, Volume= 0.048 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 597.12' @ 12.13 hrs Surf.Area= 1,941 sf Storage= 1,319 cf
Flood Elev= 598.00' Surf.Area= 2,630 sf Storage= 3,339 cf
Plug-Flow detention time= 339.7 min calculated for 0.096 af (100% of inflow)
Center-of-Mass det. time= 339.9 min ( 1,162.0 - 822.1 )
Volume Invert Avail.Storage Storage Description
#1 596.00' 3,339 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
596.00 348 0 0
597.00 1,850 1,099 1,099
598.00 2,630 2,240 3,339
Device Routing Invert Outlet Devices
#1 Primary 596.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.13 hrs HW=597.12' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=1.04 cfs @ 12.13 hrs HW=597.12' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 1.04 cfs of 5.54 cfs potential flow)
2=Overflow Grate (Weir Controls 1.04 cfs @ 1.11 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 564 of 1493
Page 565
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 37
Pond BIO-2: Filtration Bioretention
Hydrograph
1.75 cfs Inflow
Outflow
Inflow Area=0.649 ac Primary
Secondary
Tertiary
Peak Elev=597.12'
Storage=1,319 cf
1.06 cfs
1.04 cfs
Flow (cfs)
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 565 of 1493
Page 566
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 38
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.677 ac, 70.98% Impervious, Inflow Depth = 2.39" for 10-yr event
Inflow = 2.39 cfs @ 12.04 hrs, Volume= 0.135 af
Outflow = 1.07 cfs @ 12.18 hrs, Volume= 0.135 af, Atten= 55%, Lag= 8.6 min
Primary = 0.04 cfs @ 12.18 hrs, Volume= 0.084 af
Routed to Reach DP-1 : Design Point
Secondary = 1.03 cfs @ 12.18 hrs, Volume= 0.050 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.12' @ 12.18 hrs Surf.Area= 3,334 sf Storage= 2,359 cf
Flood Elev= 597.00' Surf.Area= 3,978 sf Storage= 5,592 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 411.1 min ( 1,203.9 - 792.8 )
Volume Invert Avail.Storage Storage Description
#1 595.00' 5,592 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
595.00 705 0 0
596.00 3,250 1,978 1,978
597.00 3,978 3,614 5,592
Device Routing Invert Outlet Devices
#1 Primary 595.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.04 cfs @ 12.18 hrs HW=596.12' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=1.03 cfs @ 12.18 hrs HW=596.12' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 1.03 cfs of 6.00 cfs potential flow)
2=Overflow Grate (Weir Controls 1.03 cfs @ 1.11 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 566 of 1493
Page 567
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 39
Pond BIO-3: Filtration Bioretention
Hydrograph
2.39 cfs Inflow
Outflow
Inflow Area=0.677 ac Primary
Secondary
Tertiary
Peak Elev=596.12'
Storage=2,359 cf
2
1.07 cfs
Flow (cfs)
1.03 cfs
1
0.04 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 567 of 1493
Page 568
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 40
Summary for Pond CH-1: Chambers
Inflow Area = 2.091 ac, 90.96% Impervious, Inflow Depth = 2.73" for 10-yr event
Inflow = 8.11 cfs @ 12.04 hrs, Volume= 0.476 af
Outflow = 1.66 cfs @ 12.48 hrs, Volume= 0.476 af, Atten= 80%, Lag= 26.9 min
Primary = 1.66 cfs @ 12.48 hrs, Volume= 0.476 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 593.15' @ 12.48 hrs Surf.Area= 0.127 ac Storage= 0.161 af
Flood Elev= 598.32' Surf.Area= 0.127 ac Storage= 0.433 af
Plug-Flow detention time= 60.0 min calculated for 0.476 af (100% of inflow)
Center-of-Mass det. time= 59.7 min ( 829.9 - 770.2 )
Volume Invert Avail.Storage Storage Description
#1A 591.25' 0.177 af 37.08'W x 149.10'L x 5.50'H Field A
0.698 af Overall - 0.256 af Embedded = 0.442 af x 40.0% Voids
#2A 592.00' 0.256 af ADS_StormTech MC-3500 d +Cap x 100 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
100 Chambers in 5 Rows
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
0.433 af Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
#1 Primary 591.25' 8.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.25' / 591.00' S= 0.0100 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=1.66 cfs @ 12.48 hrs HW=593.15' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 1.66 cfs @ 4.75 fps)
Page 568 of 1493
Page 569
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 41
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
5 Rows x 77.0" Wide + 9.0" Spacing x 4 + 12.0" Side Stone x 2 = 37.08' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
100 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 5 Rows = 11,144.2 cf Chamber Storage
30,410.2 cf Field - 11,144.2 cf Chambers = 19,266.0 cf Stone x 40.0% Voids = 7,706.4 cf Stone Storage
Chamber Storage + Stone Storage = 18,850.6 cf = 0.433 af
Overall Storage Efficiency = 62.0%
Overall System Size = 149.10' x 37.08' x 5.50'
100 Chambers
1,126.3 cy Field
713.6 cy Stone
Page 569 of 1493
Page 570
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 42
Pond CH-1: Chambers
Hydrograph
Inflow
9 8.11 cfs Primary
8
Inflow Area=2.091 ac
Peak Elev=593.15'
7
Storage=0.161 af
6
8.0"
Flow (cfs)
5
Round Culvert
4 n=0.013
3 L=25.0'
2
1.66 cfs S=0.0100 '/'
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 570 of 1493
Page 571
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 43
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=27,596 sf 33.98% Impervious Runoff Depth=3.67"
Tc=6.0 min CN=86 Runoff=3.44 cfs 0.194 af
Subcatchment PS-2: Runoff Area=72,316 sf 88.61% Impervious Runoff Depth=4.75"
Tc=6.0 min CN=96 Runoff=10.80 cfs 0.657 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=3.67"
Tc=6.0 min CN=86 Runoff=3.52 cfs 0.199 af
Subcatchment PS-4: Runoff Area=29,485 sf 70.98% Impervious Runoff Depth=4.41"
Tc=6.0 min CN=93 Runoff=4.23 cfs 0.249 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=4.98"
Tc=6.0 min CN=98 Runoff=2.85 cfs 0.179 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=4.98"
Tc=6.0 min CN=98 Runoff=1.01 cfs 0.063 af
Subcatchment PS-7: Runoff Area=245,856 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=391' Tc=14.0 min CN=80 Runoff=18.94 cfs 1.451 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=3.15 cfs 0.316 af
Reach DP-1: Design Point Inflow=31.66 cfs 3.307 af
Outflow=31.66 cfs 3.307 af
Pond BIO-1: Filtration Bioretention Peak Elev=599.25' Storage=1,462 cf Inflow=3.44 cfs 0.194 af
Primary=0.02 cfs 0.048 af Secondary=3.18 cfs 0.146 af Tertiary=0.00 cfs 0.000 af Outflow=3.21 cfs 0.194 af
Pond BIO-2: Filtration Bioretention Peak Elev=597.25' Storage=1,582 cf Inflow=3.52 cfs 0.199 af
Primary=0.02 cfs 0.052 af Secondary=3.23 cfs 0.147 af Tertiary=0.00 cfs 0.000 af Outflow=3.26 cfs 0.199 af
Pond BIO-3: Filtration Bioretention Peak Elev=596.27' Storage=2,865 cf Inflow=4.23 cfs 0.249 af
Primary=0.04 cfs 0.094 af Secondary=3.57 cfs 0.155 af Tertiary=0.00 cfs 0.000 af Outflow=3.61 cfs 0.249 af
Pond CH-1: Chambers Peak Elev=594.85' Storage=0.322 af Inflow=13.65 cfs 0.836 af
8.0" Round Culvert n=0.013 L=25.0' S=0.0100 '/' Outflow=2.40 cfs 0.836 af
Total Runoff Area = 11.074 ac Runoff Volume = 3.308 af Average Runoff Depth = 3.58"
73.21% Pervious = 8.107 ac 26.79% Impervious = 2.967 ac
Page 571 of 1493
Page 572
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 44
Summary for Subcatchment PS-1:
Runoff = 3.44 cfs @ 12.04 hrs, Volume= 0.194 af, Depth= 3.67"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
9,376 98 Paved parking, HSG D
18,220 80 >75% Grass cover, Good, HSG D
27,596 86 Weighted Average
18,220 66.02% Pervious Area
9,376 33.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
Runoff
3.44 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
3
Runoff Area=27,596 sf
Runoff Volume=0.194 af
Runoff Depth=3.67"
Tc=6.0 min
Flow (cfs)
2
CN=86
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 572 of 1493
Page 573
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 45
Summary for Subcatchment PS-2:
Runoff = 10.80 cfs @ 12.04 hrs, Volume= 0.657 af, Depth= 4.75"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
64,081 98 Paved parking, HSG D
8,235 80 >75% Grass cover, Good, HSG D
72,316 96 Weighted Average
8,235 11.39% Pervious Area
64,081 88.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
12 Runoff
10.80 cfs
11
NY-West Seneca 24-hr S1 100-yr
10 Rainfall=5.22"
9 Runoff Area=72,316 sf
Runoff Volume=0.657 af
8
Runoff Depth=4.75"
7
Tc=6.0 min
Flow (cfs)
6 CN=96
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 573 of 1493
Page 574
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 46
Summary for Subcatchment PS-3:
Runoff = 3.52 cfs @ 12.04 hrs, Volume= 0.199 af, Depth= 3.67"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
Runoff
3.52 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
3 Runoff Area=28,267 sf
Runoff Volume=0.199 af
Runoff Depth=3.67"
Tc=6.0 min
Flow (cfs)
2 CN=86
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 574 of 1493
Page 575
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 47
Summary for Subcatchment PS-4:
Runoff = 4.23 cfs @ 12.04 hrs, Volume= 0.249 af, Depth= 4.41"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
8,557 80 >75% Grass cover, Good, HSG D
29,485 93 Weighted Average
8,557 29.02% Pervious Area
20,928 70.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
4.23 cfs
NY-West Seneca 24-hr S1 100-yr
4
Rainfall=5.22"
Runoff Area=29,485 sf
Runoff Volume=0.249 af
3 Runoff Depth=4.41"
Tc=6.0 min
Flow (cfs)
CN=93
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 575 of 1493
Page 576
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 48
Summary for Subcatchment PS-5:
Runoff = 2.85 cfs @ 12.04 hrs, Volume= 0.179 af, Depth= 4.98"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
3 2.85 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
Runoff Area=18,756 sf
Runoff Volume=0.179 af
2 Runoff Depth=4.98"
Tc=6.0 min
Flow (cfs)
CN=98
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 576 of 1493
Page 577
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 49
Summary for Subcatchment PS-6:
Runoff = 1.01 cfs @ 12.04 hrs, Volume= 0.063 af, Depth= 4.98"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
1.01 cfs
1 NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
Runoff Area=6,622 sf
Runoff Volume=0.063 af
Runoff Depth=4.98"
Tc=6.0 min
Flow (cfs)
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 577 of 1493
Page 578
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 50
Summary for Subcatchment PS-7:
Runoff = 18.94 cfs @ 12.15 hrs, Volume= 1.451 af, Depth= 3.09"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
245,856 80 >75% Grass cover, Good, HSG D
245,856 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
21 Runoff
20 18.94 cfs
19 NY-West Seneca 24-hr S1 100-yr
18
17
Rainfall=5.22"
16 Runoff Area=245,856 sf
15
Runoff Volume=1.451 af
14
13 Runoff Depth=3.09"
Flow Length=391'
Flow (cfs)
12
11
10
Tc=14.0 min
9 CN=80
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 578 of 1493
Page 579
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 51
Summary for Subcatchment PS-8:
Runoff = 3.15 cfs @ 12.31 hrs, Volume= 0.316 af, Depth= 3.09"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
Runoff
3.15 cfs
NY-West Seneca 24-hr S1 100-yr
3
Rainfall=5.22"
Runoff Area=53,474 sf
Runoff Volume=0.316 af
Runoff Depth=3.09"
Flow Length=821'
Flow (cfs)
2
Slope=0.0100 '/'
Tc=25.7 min
CN=80
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 579 of 1493
Page 580
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 52
Summary for Reach DP-1: Design Point
Inflow Area = 11.074 ac, 26.79% Impervious, Inflow Depth = 3.58" for 100-yr event
Inflow = 31.66 cfs @ 12.12 hrs, Volume= 3.307 af
Outflow = 31.66 cfs @ 12.12 hrs, Volume= 3.307 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
31.66 cfs Outflow
34 31.66 cfs
32 Inflow Area=11.074 ac
30
28
26
24
22
Flow (cfs)
20
18
16
14
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 580 of 1493
Page 581
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 53
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.634 ac, 33.98% Impervious, Inflow Depth = 3.67" for 100-yr event
Inflow = 3.44 cfs @ 12.04 hrs, Volume= 0.194 af
Outflow = 3.21 cfs @ 12.06 hrs, Volume= 0.194 af, Atten= 7%, Lag= 1.5 min
Primary = 0.02 cfs @ 12.06 hrs, Volume= 0.048 af
Routed to Reach DP-1 : Design Point
Secondary = 3.18 cfs @ 12.06 hrs, Volume= 0.146 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 599.25' @ 12.06 hrs Surf.Area= 1,896 sf Storage= 1,462 cf
Flood Elev= 600.00' Surf.Area= 2,500 sf Storage= 3,120 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 168.5 min ( 967.4 - 798.9 )
Volume Invert Avail.Storage Storage Description
#1 598.00' 3,120 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
598.00 340 0 0
599.00 1,700 1,020 1,020
600.00 2,500 2,100 3,120
Device Routing Invert Outlet Devices
#1 Primary 598.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.06 hrs HW=599.25' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=3.18 cfs @ 12.06 hrs HW=599.25' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 3.18 cfs of 6.09 cfs potential flow)
2=Overflow Grate (Weir Controls 3.18 cfs @ 1.62 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 581 of 1493
Page 582
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 54
Pond BIO-1: Filtration Bioretention
Hydrograph
3.44 cfs Inflow
Outflow
3.21 cfs Inflow Area=0.634 ac Primary
Secondary
Tertiary
3.18 cfs Peak Elev=599.25'
Storage=1,462 cf
3
Flow (cfs)
2
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 582 of 1493
Page 583
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 55
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 3.67" for 100-yr event
Inflow = 3.52 cfs @ 12.04 hrs, Volume= 0.199 af
Outflow = 3.26 cfs @ 12.06 hrs, Volume= 0.199 af, Atten= 8%, Lag= 1.6 min
Primary = 0.02 cfs @ 12.06 hrs, Volume= 0.052 af
Routed to Reach DP-1 : Design Point
Secondary = 3.23 cfs @ 12.06 hrs, Volume= 0.147 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 597.25' @ 12.06 hrs Surf.Area= 2,044 sf Storage= 1,582 cf
Flood Elev= 598.00' Surf.Area= 2,630 sf Storage= 3,339 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 176.3 min ( 975.2 - 798.9 )
Volume Invert Avail.Storage Storage Description
#1 596.00' 3,339 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
596.00 348 0 0
597.00 1,850 1,099 1,099
598.00 2,630 2,240 3,339
Device Routing Invert Outlet Devices
#1 Primary 596.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.06 hrs HW=597.25' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=3.22 cfs @ 12.06 hrs HW=597.25' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 3.22 cfs of 5.63 cfs potential flow)
2=Overflow Grate (Weir Controls 3.22 cfs @ 1.63 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 583 of 1493
Page 584
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 56
Pond BIO-2: Filtration Bioretention
Hydrograph
3.52 cfs Inflow
Outflow
3.26 cfs Inflow Area=0.649 ac Primary
Secondary
Tertiary
3.23 cfs Peak Elev=597.25'
Storage=1,582 cf
3
Flow (cfs)
2
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 584 of 1493
Page 585
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 57
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.677 ac, 70.98% Impervious, Inflow Depth = 4.41" for 100-yr event
Inflow = 4.23 cfs @ 12.04 hrs, Volume= 0.249 af
Outflow = 3.61 cfs @ 12.08 hrs, Volume= 0.249 af, Atten= 15%, Lag= 2.3 min
Primary = 0.04 cfs @ 12.08 hrs, Volume= 0.094 af
Routed to Reach DP-1 : Design Point
Secondary = 3.57 cfs @ 12.08 hrs, Volume= 0.155 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.27' @ 12.08 hrs Surf.Area= 3,443 sf Storage= 2,865 cf
Flood Elev= 597.00' Surf.Area= 3,978 sf Storage= 5,592 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 255.7 min ( 1,030.5 - 774.9 )
Volume Invert Avail.Storage Storage Description
#1 595.00' 5,592 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
595.00 705 0 0
596.00 3,250 1,978 1,978
597.00 3,978 3,614 5,592
Device Routing Invert Outlet Devices
#1 Primary 595.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.04 cfs @ 12.08 hrs HW=596.26' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=3.57 cfs @ 12.08 hrs HW=596.26' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 3.57 cfs of 6.11 cfs potential flow)
2=Overflow Grate (Weir Controls 3.57 cfs @ 1.68 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 585 of 1493
Page 586
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 58
Pond BIO-3: Filtration Bioretention
Hydrograph
4.23 cfs Inflow
Outflow
Inflow Area=0.677 ac Primary
Secondary
Tertiary
3.61 cfs Peak Elev=596.27'
4
3.57 cfs Storage=2,865 cf
3
Flow (cfs)
2
1
0.04 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 586 of 1493
Page 587
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 59
Summary for Pond CH-1: Chambers
Inflow Area = 2.091 ac, 90.96% Impervious, Inflow Depth = 4.80" for 100-yr event
Inflow = 13.65 cfs @ 12.04 hrs, Volume= 0.836 af
Outflow = 2.40 cfs @ 12.57 hrs, Volume= 0.836 af, Atten= 82%, Lag= 31.8 min
Primary = 2.40 cfs @ 12.57 hrs, Volume= 0.836 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 594.85' @ 12.57 hrs Surf.Area= 0.127 ac Storage= 0.322 af
Flood Elev= 598.32' Surf.Area= 0.127 ac Storage= 0.433 af
Plug-Flow detention time= 68.0 min calculated for 0.836 af (100% of inflow)
Center-of-Mass det. time= 68.1 min ( 825.0 - 757.0 )
Volume Invert Avail.Storage Storage Description
#1A 591.25' 0.177 af 37.08'W x 149.10'L x 5.50'H Field A
0.698 af Overall - 0.256 af Embedded = 0.442 af x 40.0% Voids
#2A 592.00' 0.256 af ADS_StormTech MC-3500 d +Cap x 100 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
100 Chambers in 5 Rows
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
0.433 af Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
#1 Primary 591.25' 8.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.25' / 591.00' S= 0.0100 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=2.40 cfs @ 12.57 hrs HW=594.85' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 2.40 cfs @ 6.87 fps)
Page 587 of 1493
Page 588
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 60
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
5 Rows x 77.0" Wide + 9.0" Spacing x 4 + 12.0" Side Stone x 2 = 37.08' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
100 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 5 Rows = 11,144.2 cf Chamber Storage
30,410.2 cf Field - 11,144.2 cf Chambers = 19,266.0 cf Stone x 40.0% Voids = 7,706.4 cf Stone Storage
Chamber Storage + Stone Storage = 18,850.6 cf = 0.433 af
Overall Storage Efficiency = 62.0%
Overall System Size = 149.10' x 37.08' x 5.50'
100 Chambers
1,126.3 cy Field
713.6 cy Stone
Page 588 of 1493
Page 589
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 61
Pond CH-1: Chambers
Hydrograph
Inflow
15
13.65 cfs Primary
14 Inflow Area=2.091 ac
13
12
Peak Elev=594.85'
11 Storage=0.322 af
10
9
8.0"
Flow (cfs)
8 Round Culvert
7
n=0.013
6
5 L=25.0'
4
2.40 cfs S=0.0100 '/'
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 589 of 1493
Page 590
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 62
Events for Subcatchment PS-1:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.72 0.038 0.72
10-yr 3.14 1.71 0.094 1.78
100-yr 5.22 3.44 0.194 3.67
Page 590 of 1493
Page 591
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 63
Events for Subcatchment PS-2:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 3.74 0.194 1.40
10-yr 3.14 6.39 0.372 2.69
100-yr 5.22 10.80 0.657 4.75
Page 591 of 1493
Page 592
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 64
Events for Subcatchment PS-3:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.74 0.039 0.72
10-yr 3.14 1.75 0.096 1.78
100-yr 5.22 3.52 0.199 3.67
Page 592 of 1493
Page 593
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 65
Events for Subcatchment PS-4:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 1.28 0.065 1.15
10-yr 3.14 2.39 0.135 2.39
100-yr 5.22 4.23 0.249 4.41
Page 593 of 1493
Page 594
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 66
Events for Subcatchment PS-5:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 1.06 0.057 1.60
10-yr 3.14 1.72 0.104 2.91
100-yr 5.22 2.85 0.179 4.98
Page 594 of 1493
Page 595
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 67
Events for Subcatchment PS-6:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.37 0.020 1.60
10-yr 3.14 0.61 0.037 2.91
100-yr 5.22 1.01 0.063 4.98
Page 595 of 1493
Page 596
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 68
Events for Subcatchment PS-7:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 2.49 0.215 0.46
10-yr 3.14 8.08 0.638 1.36
100-yr 5.22 18.94 1.451 3.09
Page 596 of 1493
Page 597
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 69
Events for Subcatchment PS-8:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.40 0.047 0.46
10-yr 3.14 1.32 0.139 1.36
100-yr 5.22 3.15 0.316 3.09
Page 597 of 1493
Page 598
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 70
Events for Reach DP-1: Design Point
Event Inflow Outflow Elevation Storage
(cfs) (cfs) (feet) (cubic-feet)
1-yr 4.12 4.12 0.00 0
10-yr 13.96 13.96 0.00 0
100-yr 31.66 31.66 0.00 0
Page 598 of 1493
Page 599
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 71
Events for Pond BIO-1: Filtration Bioretention
Event Inflow Outflow Primary Secondary Tertiary Elevation Storage
(cfs) (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet)
1-yr 0.72 0.02 0.02 0.00 0.00 598.98 994
10-yr 1.71 1.12 0.02 1.10 0.00 599.12 1,232
100-yr 3.44 3.21 0.02 3.18 0.00 599.25 1,462
Page 599 of 1493
Page 600
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 72
Events for Pond BIO-2: Filtration Bioretention
Event Inflow Outflow Primary Secondary Tertiary Elevation Storage
(cfs) (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet)
1-yr 0.74 0.02 0.02 0.00 0.00 596.95 1,010
10-yr 1.75 1.06 0.02 1.04 0.00 597.12 1,319
100-yr 3.52 3.26 0.02 3.23 0.00 597.25 1,582
Page 600 of 1493
Page 601
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 73
Events for Pond BIO-3: Filtration Bioretention
Event Inflow Outflow Primary Secondary Tertiary Elevation Storage
(cfs) (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet)
1-yr 1.28 0.04 0.04 0.00 0.00 595.92 1,729
10-yr 2.39 1.07 0.04 1.03 0.00 596.12 2,359
100-yr 4.23 3.61 0.04 3.57 0.00 596.27 2,865
Page 601 of 1493
Page 602
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 74
Events for Pond CH-1: Chambers
Event Inflow Primary Elevation Storage
(cfs) (cfs) (feet) (acre-feet)
1-yr 4.80 1.18 592.38 0.079
10-yr 8.11 1.66 593.15 0.161
100-yr 13.65 2.40 594.85 0.322
Page 602 of 1493
Page 603
Appendix f:
Swppp inspection report
(sample form)
Page 603 of 1493
Page 604
Page 604 of 1493
Page 605
Prepared by:
LaBella Associates
Choose an item.
Choose an item.
Choose an item.
SWPPP INSPECTION REPORT NUMBER XX
CLIENT NAME
PROJECT NAME
PROJECT ADDRESS, TOWN OF X, X COUNTY, NY
PERMIT NUMBER
Performed: 2/1/2025 @ 12:00 AM
Report Issued: 2/1/2025
Status: SATISFACTORY (All erosion control measures are installed and in
working order)
Qualified Inspector (name and title) Qualified Professional (name and title)
Click or tap to enter a date. Click or tap to enter a date.
Date Date
Signature Signature
Page 605 of 1493
Page 606
Page 606 of 1493
Page 607
NYSDEC Documentation and SWPPP Forms
The project has received a Letter of Authorization (LOA) from NYSDEC Choose an item.
The project has received a five acre waiver approved by NYSDEC or MS4 Choose an item.
The project currently has disturbance greater than five acres Choose an item.
The project directly discharges to a 303d waterbody/course Choose an item.
The project is within a phosphorus enhanced watershed Choose an item.
Number of inspections required per week Choose an item.
Included in Site Log Book
Preconstruction Assessment Choose an item.
Copy of Notice of Intent (NOI) Choose an item.
Letter of Authorization (LOA) Choose an item.
SWPPP Preparer Certification Form Choose an item.
Owner/Operator Certification Form Choose an item.
MS4 SWPPP Acceptance Form Choose an item.
NYCDEP SWPPP Acceptance/Approval Form Choose an item.
MS4 No Jurisdiction Form Choose an item.
Contractor and Subcontractor Certifications Choose an item.
SPDES General Permit Choose an item.
Five Acre Waiver Authorization Choose an item.
Notice of Termination (NOT) Choose an item.
Site Conditions
Total area (acres) with active soil disturbance (not requiring temporary or final stabilization)
Total area (acres) with inactive soil disturbance (requiring temporary or final stabilization)
Total area (acres) that has achieved temporary stabilization
Total area (acres) that has achieved final stabilization
Allowable disturbed area (acres) per NOI and/or five acre waiver
Provide a general description of construction activities ongoing during inspection:
Weather Conditions Choose an item.
Temperature at time of inspection XX degrees F
Soil conditions at time of inspection Choose an item.
Description of Discharge
Sediment Discharge
Point/Surface Waters of Condition of Runoff Corrective Action(s)
Noted
the State
Choose an item. Choose an item.
Choose an item. Choose an item.
Choose an item. Choose an item.
Choose an item. Choose an item.
Page 607 of 1493
Page 608
Erosion and Sediment Control Deficiencies and Corrective Actions
In the following table, provide marks in the appropriate columns to indicate the conditions of all erosion and
sediment control practices at the site.
Erosion & Sediment Control Functioning as Needs Repair or Not Installed
Not Applicable
Practice Designed Maintenance Properly
Temporary Erosion & Sediment Control Practices
General Site Conditions ☐ ☐ ☐ ☐
Stabilized Construction Access ☐ ☐ ☐ ☐
Silt Fence ☐ ☐ ☐ ☐
Inlet Protection Measures ☐ ☐ ☐ ☐
Soil Stockpiles ☐ ☐ ☐ ☐
Dust Control Measures ☐ ☐ ☐ ☐
Pavement Sweeping ☐ ☐ ☐ ☐
Temporary Stabilization ☐ ☐ ☐ ☐
Dewatering Operations ☐ ☐ ☐ ☐
Slope Protection Measures ☐ ☐ ☐ ☐
Temporary Parking Areas ☐ ☐ ☐ ☐
Concrete Washout ☐ ☐ ☐ ☐
Temporary Swales and Berms ☐ ☐ ☐ ☐
Stone Check Dams ☐ ☐ ☐ ☐
Sediment Traps/Basins ☐ ☐ ☐ ☐
Compost Filter Sock ☐ ☐ ☐ ☐
Temporary Stream Crossing ☐ ☐ ☐ ☐
Fiber Roll ☐ ☐ ☐ ☐
Water Bars ☐ ☐ ☐ ☐
Flow Diffusers ☐ ☐ ☐ ☐
Other: ☐ ☐ ☐ ☐
Permanent Erosion & Sediment Control Practices
Rock Outlet Protection ☐ ☐ ☐ ☐
Permanent Turf Reinforcement ☐ ☐ ☐ ☐
Permanent Stabilization ☐ ☐ ☐ ☐
Other: ☐ ☐ ☐ ☐
Refer to the following page for deficiencies and corrective actions
Page 608 of 1493
Page 609
Corrective Actions
For all erosion and sediment control practices identified in the above table as “needs repair or maintenance” or “not
installed properly,” provide detailed corrective actions that are required.
Date
Date
Deficiency Deficiency
ESC Practice ID Deficiency and Corrective Action Deficiency
First Corrected?
Corrected
Reported
Choose an item. Click or Choose an Click or tap
Choose an item. tap to
Click or item. an
Choose to enter
Click a
or tap
Choose an item. enter
tap to
Click a
or item. an
Choose date.
to enter
Click a
or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. date.
to enter a
date.a
enter date.
date.
Page 609 of 1493
Page 610
Stormwater Management Practices
For all stormwater management practices proposed on the project, indicate the status of each practice at the time
of inspection, any deficiencies (if applicable) and corresponding corrective actions.
SMP
Sign Deficiency and Corrective Deficiency Corrected
Practice Status
Installed Action (if Applicable) Date Action Date
ID
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Page 610 of 1493
Page 611
Deficiencies and Corrective Action Photo Log
Deficiency Photo 1 Corrective Action Photo 1
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 2 Corrective Action Photo 2
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 3 Corrective Action Photo 3
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Page 611 of 1493
Page 612
Deficiencies and Corrective Action Photo Log (continued)
Deficiency Photo 4 Corrective Action Photo 4
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 5 Corrective Action Photo 5
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 6 Corrective Action Photo 6
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Page 612 of 1493
Page 613
Disturbance / Photo Location Map
Replace this page to include an 11x17 erosion control plan sketch to scale showing:
1. Areas with active soil disturbance activity
2. Areas with inactive soil disturbance activity
3. Areas that have achieved temporary stabilization
4. Areas that have achieved final stabilization
5. Photo locations for deficiencies
6. Photo locations for corrective actions
7. Location of erosion and sediment control practices installed
Use Bluebeam template with standard colors to indicate limits
Page 613 of 1493
Page 614
Page 614 of 1493
Page 615
Appendix G:
Post-construction
inspections and maintenance
Page 615 of 1493
Page 616
Page 616 of 1493
Page 617
Bioretention Stormwater Management Practices
Level 1 Inspection Checklist
SMP ID # SMP Owner Private
Public
SMP Location
(Address; Latitude
& Longitude)
Latitude Longitude
Party Responsible for
System Type Type of Site
Maintenance
Same as SMP Owner Seasonal Above Ground Commercial
Other Continuous Use Below Ground Industrial
Other Residential
_________________________
State
Inspection Date Inspection Time
Inspector
Date of Last
Inspection
BR Drainage Area
Look for areas that are uphill from the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Seed and mulch areas of bare soil to establish
vegetation.
Bare soil, erosion Fill in erosion areas with soil, compact, and seed and
of the ground straw to establish vegetation.
(rills washing out If a rill or small channel is forming, try to redirect water
the dirt) flowing to this area by creating a small berm or adding
topsoil to areas that are heavily compacted.
Other:
Page 1 of 8
Page 617 of 1493
Page 618
BR Drainage Area
Look for areas that are uphill from the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Kick-Out to Level 2 Inspection: Large areas of soil
have been eroded, or larger channels are forming.
May require rerouting of flow paths.
Piles of grass Remove or cover piles of grass clippings,
clippings, mulch, mulch, dirt, etc.
dirt, salt, or
other materials Other:
Cover or properly dispose of materials; consult your
Open containers local solid waste authority for guidance on materials
of oil, grease, that may be toxic or hazardous.
paint, or other
substances
Other:
Page 2 of 8
Page 618 of 1493
Page 619
BR Inlets
Stand in the Bioretention cell itself and look for all the places where water flows in. Often there will be multiple points of inflow to the
practice.
Problem (Check if Present) Follow-Up Actions
Use a flat shovel to remove grit and debris (especially at curb inlets
or openings). Parking lots generate fine grit that will accumulate at
these spots.
Pull out clumps of growing grass or weeds and scoop out the soil or grit
that the plants are growing in.
Remove any grass clippings, leaves, sticks, and other debris that is
collecting at inlets.
For pipes and ditches, remove sediment and debris that is partially
blocking the pipe or ditch opening where it enters the Bioretention cell.
Dispose of all material properly where it will not re-enter the
Bioretention cell.
Other:
Inlets collect grit and debris or grass/weeds.
Some water may not be getting into the
Bioretention cell. The objective is to have a
clear pathway for water to flow into the cell.
Kick-Out to Level 2 Inspection: Inlets are blocked to the extent that most
of the water does not seem to be entering the Bioretention cell.
For small areas of erosion, smooth out the eroded part and apply rock or
stone (e.g., river cobble) to prevent further erosion. Usually, filter fabric is
placed under the rock or stone.
In some cases, reseeding and applying erosion-control matting can be
used to prevent further erosion. Some of these materials may be available
at a garden center, but it may be best to consult a landscape contractor.
Other:
Kick-Out to Level 2 Inspection: Erosion is occurring at most of the inlets,
Some or all of the inlets are eroding so that and it looks like there is too much water that is concentrating at these
rills, gullies, and other erosion is present, or points. The inlet design may have to be modified.
there is bare dirt that is washing into the
Bioretention cell.
Page 3 of 8
Page 619 of 1493
Page 620
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Add new mulch to a total depth (including any existing mulch that is left) of 2
to 3 inches. The mulch should be shredded hardwood mulch that is less
likely to float away during rainstorms.
Avoid adding too much mulch so that inlets are obstructed or certain areas
become higher than the rest of the Bioretention surface.
Other:
Mulch (if used) needs to be replaced or
replenished. The mulch layer had
decomposed or is less than 1-inch thick.
Use a shovel to scoop out minor areas of sediment or grit, especially in the
spring after winter sanding materials may wash in and accumulate. Dispose
of the material where it cannot re-enter the Bioretention cell .
If removing the material creates a hole or low area, fill with soil mix that
matches original mix and cover with mulch so that the Bioretention surface
area is as flat as possible.
Remove trash, vegetative debris, and other undesirable materials.
Other:
Kick-Out to Level 2 Inspection: Sediment has accumulated more than 2-
inches deep and covers 25% or more of the Bioretention surface.
Kick-Out to Level 2 Inspection: The Bioretention cell is too
densely vegetated to assess sediment accumulation or ponding;
Minor areas of sediment, grit, trash, or other see BR-4, Vegetation.
debris are accumulating on the bottom.
Page 4 of 8
Page 620 of 1493
Page 621
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Try filling the eroded areas with clean topsoil or sand, and cover with
mulch.
If the problem recurs, you may have to use stone (e.g., river cobble) to fill
in problem areas.
If the erosion is on a side slope, fill with clay that can be compacted and
seed and mulch the area.
Other:
There is erosion in the bottom or on the side
slopes. Water seems to be carving out rills as
it flows across the Bioretention surface or on
the slopes, or sinkholes are forming in certain Kick-Out to Level 2 Inspection: The problem persists or the erosion is more
areas. than 3-inches deep and seems to be an issue with how water enters and
Source: Stormwater Maintenance, LLC. moves through the Bioretention cell.
Kick-Out to Level 2 Inspection: The problem does not seem to be caused
by flowing water, but a collapse or sinking of the surface (e.g., “sinkhole”)
due to some underground problem.
If the problem is minor (just small, isolated areas are not covered with
water), try raking the surface OR adding mulch to low spots to create a
more level surface. You may need to remove and replace plantings in
order to properly even off the surface.
Check the surface with a string and bubble level to get the surface as flat
as possible.
Other:
Kick-Out to Level 2 Inspection: Ponding water is isolated to less than half
The bottom of the Bioretention cell is not flat,
of the Bioretention surface area, and there seem to be elevation
and the water pools at one end, along an
differences of more than a couple of inches across the surface.
edge, or in certain pockets. The whole bottom
is not uniformly covered with water. See
design plan to verify that bioretention surface
is intended to be flat. Check during or
immediately after a rainstorm.
Page 5 of 8
Page 621 of 1493
Page 622
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Kick-Out to Level 2 Inspection: This is generally a serious problem, and it
will be necessary to activate a Level 2 Inspection.
Water stands on the surface more than 72
hours after a rainstorm and /or wetland-type
vegetation is present. The Bioretention cell
does not appear to be draining properly.
BR Vegetation
Examine all Bioretention cell vegetation.
Problem (Check if Present) Follow-Up Actions
If you can identify which plants are weeds or not intended to
be part of the planting plan, eliminate these, preferably by
hand pulling.
If weeds are widespread, check with the local stormwater
authority and/or Extension Office about proper use of
herbicides for areas connected with the flow of water.
Even vegetation that is intended to be present can become
large, overgrown, and/or crowd out surrounding plants. Prune
and thin accordingly.
If weeds or invasive plants have overtaken the whole
Bioretention cell , bush-hog the entire area before seedheads
form in the spring. It will be necessary to remove the root mat
manually or with appropriate herbicides, as noted above.
Re-plant with species that are aesthetically pleasing and
seem to be doing well in the Bioretention cell.
Other:
Kick-Out to Level 2 Inspection: You are unsure of the original
planting design, or the vegetation maintenance task is beyond
Vegetation requires regular maintenance—pulling
your capabilities of time, expertise, or resources. If you are
weeds, removing dead and diseased plants, replacing
unsure of the health of the vegetation (e.g. salt damage,
mulch around plants, adding plants to fill in areas that
invasives, which plants are undesirable) or the appropriate
are not well vegetated, etc.
season to conduct vegetation management, consult a
landscape professional before undertaking any cutting,
pruning, mowing, or brush hogging.
Page 6 of 8
Page 622 of 1493
Page 623
BR Vegetation
Examine all Bioretention cell vegetation.
Problem (Check if Present) Follow-Up Actions
The original plants are likely not suited for the actual
conditions within the Bioretention cell . If you are
knowledgeable about plants, select and plant more
appropriate vegetation (preferably native plants) so that
almost the entire surface area will be covered by the end of
the second growing season.
Other:
Kick-Out to Level 2 Inspection: For all but small practices
(e.g., rain gardens), this task will likely require a landscape
design professional or horticulturalist.
Vegetation is too thin, is not healthy, and there are
many spots that are not well vegetated.
BR Outlets
Examine outlets that release water out of the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Add stone to reduce the impact from the water flowing out of the outlet pipe or
weir during storms.
Other:
Erosion at outlet
Kick-Out to Level 2 Inspection: Rills have formed and erosion problem
becomes more severe.
Remove the debris and dispose of it where it cannot re-enter the
Bioretention cell .
Other:
Kick-Out to Level 2 Inspection: Outlet is completely clogged or obstructed;
there is too much material to remove by hand or with simple hand tools.
Outlet obstructed with mulch, sediment,
debris, trash, etc.
Page 7 of 8
Page 623 of 1493
Page 624
Additional Notes:
Inspector: Date:
Complete the following if follow-up/corrective actions were identified during this inspection:
Certified Completion of Follow-Up Actions:
“I hereby certify that the follow-up/corrective actions identified in the inspection
performed on _____________ (DATE) have been completed and any required
maintenance deficiencies have been adequately corrected.”
Inspector/Operator: Date:
Page 8 of 8
Page 624 of 1493
Page 625
Bioretention Stormwater Management Practices
Level 2 Inspection Checklist
SMP ID # SMP Owner Private
Public
SMP Location
(Address; Latitude
& Longitude)
Latitude Longitude
Party Responsible for
System Type Type of Site
Maintenance
Same as SMP Owner Seasonal Above Ground Commercial
Other Continuous Use Below Ground Industrial
Other Residential
_________________________ State
Inspection Date Inspection Time
Inspector
Date of Last
Inspection
Page 1 of 4
Page 625 of 1493
Page 626
Level 2 Inspection: BIORETENTION
NOTE: Key Source for this Information (CSN, 2013)
Recommended Repairs Triggers for Level 3 Inspection
Observed Condition: Water Stands on Surface for More than 72 Hours after Storm
Condition 1: Small pockets of standing water
Use a soil probe or auger to examine the soil profile. If isolated areas have
accumulated grit, fines, or vegetative debris or have bad soil media, try scraping
off top 3 inches of media and replacing with clean material. Also check to see
that surface is level and water is not ponding selectively in certain areas. Soil media is clogged and problem is not
evident from Level 2 inspection.
Level 2 inspection identifies problem, but it
Condition 2: Standing water is widespread or covers entire surface cannot be resolved easily or is associated
with the original design of the practice.
Requires diagnosis and resolution of problem:
Clogged underdrain?
Filter fabric between soil media and underdrain stone?
Need to install underdrain if not present? Level 3 inspection necessary
Too much sediment/grit washing in from drainage area?
Too much ponding depth?
Improper soil media?
Observed Condition: Vegetation is sparse or out of control
Condition 1: Original design planting plan seems good but has not been
maintained, so there are many invasives and/or dead plants
Vegetation deviates significantly from
Will require some horticultural experience to restore vegetation to intended original planting plan; Bioretention has
condition by weeding, pruning, removing plants, and adding new plants. been neglected and suffered from deferred
maintenance.
Owner/responsible party does not know
Condition 2: Original design planting plan is unknown or cannot be how to maintain the practice.
actualized
A landscape architect or horticulturalist will be needed to redo the planting plan.
Will likely require analysis of soil pH, moisture, organic content, sun/shade, and
other conditions to make sure plants match conditions. Plan should include Level 3 inspection necessary
invasive plant management and maintenance plan to include mulching,
watering, disease intervention, periodic thinning/pruning, etc.
Observed Condition: Bioretention does not conform to original design plan in surface area or storage
Condition 1: Level 2 Inspection reveals that practice is too small based More than a 25% departure from the
on design dimension, does not have adequate storage (e.g., ponding approved plan in surface area, storage, or
depth) based on the plan, and/or does not treat the drainage area runoff drainage area; sometimes less than this
as indicated on the plan threshold at the discretion of the Level 2
inspector.
Small areas of deviation can be corrected by the property owner or responsible
party, but it is likely that a Qualified Professional will have to revisit the design
and attempt a redesign that meets original objectives or that can be resubmitted
to the municipality for approval. Level 3 inspection necessary
Page 2 of 4
Page 626 of 1493
Page 627
Level 2 Inspection: BIORETENTION
NOTE: Key Source for this Information (CSN, 2013)
Recommended Repairs Triggers for Level 3 Inspection
Observed Condition: Severe erosion of filter bed, inlets, or around outlets
Condition 1: Erosion at inlets
The lining (e.g., grass, matting, stone, rock) may not be adequate for the actual
flow velocities coming through the inlets. First line of defense is to try a more
non-erosive lining and/or to extend the lining further down to where inlet slopes
meet the Bioretention surface. If problem persists, analysis by a Qualified Erosion (rills, gullies) is more than 12
Professional is warranted. inches deep at inlets or the filter bed or
more than 3 inches deep on side slopes.
If the issue is not caused by moving water
Condition 2: Erosion of Bioretention filter bed but some sort of subsurface defect. This
may manifest as a sinkhole or linear
This is often caused by “preferential flow paths” through and along the depression and be associated with
Bioretention surface. The source of flow should be analyzed and methods problems with the underdrain stone or pipe
employed to dissipate energy and disperse the flow (e.g., check dams, rock or underlying soil.
splash pads).
Condition 3: Erosion on side slopes
Level 3 inspection necessary
Again, the issue is likely linked with unanticipated flow paths down the side
slopes (probably overland flow that concentrates as it hits the edge of the
slope). For small or isolated areas, try filling, compacting, and re-establishing
healthy ground cover vegetation. If the problem is more widespread, further
analysis is required to determine how to redirect the flow.
Observed Condition: Significant sediment accumulation, indicating an uncontrolled source of sediment
Condition 1: Isolated areas of sediment accumulation, generally less than
3-inches deep
More than 2 inches of accumulated
Sediment source may be from a one-time or isolated event. Remove sediment cover 25% or more of the
accumulated sediment and top 2 to 3 inches of Bioretention soil media; replace Bioretention surface area.
with clean material. Check drainage area for any ongoing sources of sediment.
“Hard pan” of thin, crusty layer covers
majority of Bioretention surface area and
seems to be impeding flow of water down
Condition 2: Majority of the surface is caked with “hard pan” (thin layer of through the soil media.
clogging material) or accumulated sediment that is 3-inches deep or
more New sources of sediment seem to be
accumulating with each significant rainfall
This can be caused by an improper construction sequence (drainage area not event.
fully stabilized prior to installation of Bioretention soil media) or another chronic
source of sediment in the drainage area. Augering several holes down through
the media can indicate how severe the problem is; often the damage is confined
to the first several inches of soil media. Removing and replacing this top layer Level 3 inspection necessary
(or to the depth where sediment incursion is seen in auger holes) can be
adequate, as long as the problem does not recur.
Page 3 of 4
Page 627 of 1493
Page 628
Notes:
Inspector: Date:
Complete the following if follow-up/corrective actions were identified during this inspection:
Certified Completion of Follow-Up Actions:
“I hereby certify that the follow-up/corrective actions identified in the inspection
performed on _____________ (DATE) have been completed and any required
maintenance deficiencies have been adequately corrected.”
Inspector/Operator: Date:
Page 4 of 4
Page 628 of 1493
Page 629
Appendix e:
Nysdec “deep-ripping and
decompaction,” April 2008
Page 629 of 1493
Page 630
Page 630 of 1493
Page 631
New York State
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Document Prepared by:
John E. Lacey,
Land Resource Consultant and Environmental Compliance Monitor
Division of Water (Formerly with the Division of Agricultural Protection and Development Services,
NYS Dept. of Agriculture & Markets)
Deep-Ripping and
Decompaction
April 2008
New York State
Department of Environmental Conservation
Page 631 of 1493
Page 632
AlternativeȱStormwaterȱManagementȱ
DeepȬRippingȱandȱDecompactionȱ
ȱ ȱ ȱ ȱ ȱ ȱ ȱ ȱ ȱ Recommended Application of Practice
Description
Theȱobjective of Deep Ripping and
The two-phase practice of 1) “Deep Ripping;” and 2) “Decompaction” (deep subsoiling), of the Decompaction is to effectively fracture
soil material as a step in the cleanup and restoration/landscaping of a construction site, helps (vertically and laterallly) through the thickness
mitigate the physically induced impacts of soil compression; i.e.: soil compaction or the of the physically compressed subsoil material
substantial increase in the bulk density of the soil material. (see Figure 3), restoring soil porosity and
permeability and aiding infiltration to help
Deep Ripping and Decompaction are key factors which help in restoring soil pore space and reduce runoff. Together with topsoil stripping,
permeability for water infiltration. Conversely, the physical actions of cut-and-fill work, land the “two-phase” practice of Deep Ripping and
grading, the ongoing movement of construction equipment and the transport of building Decompaction first became established as a “best
materials throughout a site alter the architecture and structure of the soil, resulting in: the mixing management practice” through ongoing success
of layers (horizons) of soil materials, compression of those materials and diminished soil on commercial farmlands affected by heavy Fig. 3. Construction site with significant
porosity which, if left unchecked, severely impairs the soil’s water holding capacity and vertical utility construction right-of-way projects compaction of the deep basal till subsoil
drainage (rainfall infiltration), from the surface downward. (transmission pipelines and large power lines). extends 24 inches below this exposed cut-
and-fill work surface.
In a humid climate region, compaction damage on a site is virtually guaranteed over the duration Soil permeability, soil drainage and cropland
of a project. Soil in very moist to wet condition when compacted, will have severely reduced productivity were restored. For broader
permeability. Figure 1 displays the early stage of the deep-ripping phase (Note that all topsoil construction application, the two-phase practice of Deep Ripping and Decompaction is best
was stripped prior to construction access, and it remains stockpiled until the next phase – adapted to areas impacted with significant soil compaction, on contiguous open portions of large
decompaction – is complete). A heavy-duty tractor is pulling a three-shank ripper on the first of construction sites and inside long, open construction corridors used as temporary access over the
several series of incrementally deepening passes through the construction access corridor's duration of construction. Each mitigation area should have minimal above-and-below-ground
densely compressed subsoil material. Figure 2 illustrates the approximate volumetric obstructions for the easy avoidance and maneuvering of a large tractor and ripping/decompacting
composition of a loam surface soil when conditions are good for plant growth, with adequate implements. Conversely, the complete two-phase practice is not recommended in congested or
natural pore space for fluctuating moisture conditions. obstructed areas due to the limitations on tractor and implement movement.
Benefits
Aggressive “deep ripping” through the compressed thickness of exposed subsoil before the
replacement/respreading of the topsoil layer, followed by “decompaction,” i.e.: “sub-soiling,”
through the restored topsoil layer down into the subsoil, offers the following benefits:
x Increases the project (larger size) area’s direct surface infiltration of rainfall by
providing the open site’s mitigated soil condition and lowers the demand on
concentrated runoff control structures
Fig. 1. A typical deep ripping phase of this
practice, during the first in a series of Fig. 2. About 50% of the volume of undisturbed x Enhances direct groundwater recharge through greater dispersion across and through a
progressively deeper “rips” through severely loam surface soil is pore space, when soil is in broader surface than afforded by some runoff-control structural measures
compressed subsoil. good condition for plant growth. Brady, 2002.
x Decreases runoff volume generated and provides hydrologic source control
ȱ
x May be planned for application in feasible open locations either alone or in
1
2
Page 632 of 1493
Page 633
conjunction with plans for structural practices (e.g., subsurface drain line or lawn/ground cover to help maintain the restored subsoil structure. Infiltration after construction-
infiltration basin) serving the same or contiguous areas induced mixing and compression of such subsoil material can be notably rehabilitated with the
Deep Ripping and Decompaction practice, which prepares the site for the appropriate long-term
x Promotes successful long-term revegetation by restoring soil permeability, drainage and lawn/ground cover mix including deep taproot plants such as clover, fescue or trefoil, etc. needed
water holding capacity for healthy (rather than restricted) root-system development of for all rehabilitated soils.
trees, shrubs and deep rooted ground cover, minimizing plant drowning during wet
periods and burnout during dry periods. Generally, soils in Hydrologic Soil Groups A and B, which respectively may include deep, well-
drained, sandy-gravelly materials or deep, moderately well-drained basal till materials, are among
Feasibility/Limitations the easier ones to restore permeability and infiltration, by deep ripping and decompaction. Among
the many different soils in Hydrologic Soil Group C are those unique glacial tills having a natural
The effectiveness of Deep Ripping and Decompaction is governed mostly by site factors such as: fragipan zone, beginning about 12 to 18 inches (30 – 45cm), below surface. Although soils in
the original (undisturbed) soil’s hydrologic characteristics; the general slope; local weather/timing Hydrologic Soil Group C do require a somewhat more carefully applied level of the Deep Ripping
(soil moisture) for implementation; the space-related freedom of equipment/implement and Decompaction practice, it can greatly benefit such affected areas by reducing the runoff and
maneuverability (noted above in Recommended Application of Practice), and by the proper fostering infiltration to a level equal to that of pre-disturbance.
selection and operation of tractor and implements (explained below in Design Guidance). The
more notable site-related factors include: Soils in Hydrologic Soil Group D typically have a permanent high water table close to the surface,
influenced by a clay or other highly impervious layer of material. In many locations with clay
Soil subsoil material, the bulk density is so naturally high that heavy trafficking has little or no added
In the undisturbed condition, each identified soil type comprising a site is grouped into one of impact on infiltration; and structural runoff control practices rather than Deep Ripping and
four categories of soil hydrology, Hydrologic Soil Group A, B, C or D, determined primarily by a Decompaction should be considered.
range of characteristics including soil texture, drainage capability when thoroughly wet, and depth
to water table. The natural rates of infiltration and transmission of soil-water through the The information about Hydrologic Soil Groups is merely a general guideline. Site-specific data
undisturbed soil layers for Group A is “high” with a low runoff potential while soils in Group B such as limited depths of cut-and-fill grading with minimal removal or translocation of the inherent
are moderate in infiltration and the transmission of soil-water with a moderate runoff potential, subsoil materials (as analyzed in the county soil survey) or, conversely, the excavation and
depending somewhat on slope. Soils in Group C have slow rates of infiltration and transmission translocation of deeper, unconsolidated substratum or consolidated bedrock materials (unlike the
of soil-water and a moderately high runoff potential influenced by soil texture and slope; while analyzed subsoil horizons’ materials referred to in the county soil survey) should always be taken
soils in Group D have exceptionally slow into account.
rates of infiltration and transmission of soil-
water, and high runoff potential. Sites made up with significant quantities of large rocks, or having a very shallow depth to bedrock,
are not conducive to deep ripping and decompation (subsoiling); and other measures may be more
In Figure 4, the profile displays the practical.
undisturbed horizons of a soil in Hydrologic
Soil Group C and the naturally slow rate of Slope
infiltration through the subsoil. The slow rate The two-phase application of 1) deep ripping and 2) decompaction (deep subsoiling), is most
of infiltration begins immediately below the practical on flat, gentle and moderate slopes. In some situations, such as but not limited to
topsoil horizon (30 cm), due to the limited temporary construction access corridors, inclusion areas that are moderately steep along a project’s
amount of macro pores, e.g.: natural subsoil otherwise gentle or moderate slope may also be deep ripped and decompacted. For limited
fractures, worm holes and root channels. instances of moderate steepness on other projects, however, the post-construction land use and the
Infiltration after the construction-induced relative alignment of the potential ripping and decompaction work in relation to the lay of the
mixing and compression of such subsoil slope should be reviewed for safety and practicality. In broad construction areas predominated by
material is virtually absent; but can be moderately steep or steep slopes, the practice is generally not used.
restored back to this natural level with the
Fig. 4. Profile (in centimeters) displaying the Local Weather/Timing/Soil Moisture
two-phase practice of deep ripping and
infiltration test result of the natural undisturbed Effective fracturing of compressed subsoil material from the exposed work surface, laterally and
decompaction, followed by the permanent
horizons of a soil in Hydrologic Soil Group C. vertically down through the affected zone is achieved only when the soil material is moderately
establishment of an appropriate, deep taproot
dry to moderately moist. Neither one of the two-phases, deep ripping nor decompaction (deep
3 4
Page 633 of 1493
Page 634
subsoiling), can be effectively conducted when the soil material (subsoil or replaced topsoil) is in rainfall infiltration are being restored, a policy limiting all further traffic to permanent travel lanes
either a “plastic” or “liquid” state of soil consistency. Pulling the respective implements legs is maintained.
through the soil when it is overly moist only results in the “slicing and smearing” of the material or
added “squeezing and compression” instead of the necessary fracturing. Ample drying time is The other critical elements, outlined below, are: using the proper implements (deep, heavy-duty
needed for a “rippable” soil condition not merely in the material close to the surface, but rippers and subsoilers), and ample pulling-power equipment (tractors); and conducting the practice
throughout the material located down to the bottom of the physically compressed zone of the at the appropriate speed, depth and pattern(s) of movement.
subsoil.
Note that an appropriate plan for the separate practice of establishing a healthy perennial ground
The “poor man’s Atterberg field test” for soil cover, with deep rooting to help maintain the restored soil structure, should be developed in
plasticity is a simple “hand-roll” method used advance. This may require the assistance of an agronomist or landscape horticulturist.
for quick, on-site determination of whether or
not the moisture level of the affected soil
material is low enough for: effective deep Implements
ripping of subsoil; respreading of topsoil in a Avoid the use of all undersize implements. The small-to-medium, light-duty tool will, at best, only
friable state; and final decompaction (deep “scarify” the uppermost surface portion of the mass of compacted subsoil material. The term
subsoiling). Using a sample of soil material “chisel plow” is commonly but incorrectly applied to a broad range of implements. While a few
obtained from the planned bottom depth of may be adapted for the moderate subsoiling of non-impacted soils, the majority are less durable
ripping, e.g.: 20 - 24 inches below exposed and used for only lighter land-fitting (see Figure 6).
subsoil surface, the sample is hand rolled
between the palms down to a 1/8-inch diameter
thread. (Use the same test for stored topsoil Fig. 5. Augered from a depth of 19 inches
material before respreading on the site.) If the below the surface of the replaced topsoil,
respective soil sample crumbles apart in this subsoil sample was hand rolled to a
segments no greater than 3/8 of an inch long, by 1/8-inch diameter. The test shows the soil at
the time it is rolled down to 1/8 inch diameter, it this site stretches out too far without
is low enough in moisture for deep ripping (or crumbling; it indicates the material is in a
topsoil replacement), and decompaction. plastic state of consistence, too wet for final
Conversely, as shown in Figure 5, if the rolled decompaction (deep subsoiling) at this time.
sample stretches out in increments greater than
3/8 of an inch long before crumbling, it is in a “plastic” state of soil consistency and is too wet for
subsoil ripping (as well as topsoil replacement) and final decompaction.
Fig. 6. A light duty chisel implement, not Fig. 7. One of several variations of an
adequate for either the deep ripping or agricultural ripper. This unit has long, rugged
Design Guidance
shanks mounted on a steel V-frame for deep,
decompaction (deep subsoiling) phase.
aggressive fracturing through Phase 1.
Beyond the above-noted site factors, a vital requirement for the effective Deep Ripping and
Decompaction (deep subsoiling), is implementing the practice in its distinct, two-phase process:
Use a “heavy duty” agricultural-grade, deep ripper (see Figures 7,9,10 and 11) for the first phase:
1) Deep rip the affected thickness of exposed subsoil material (see Figure 10 and 11), aggressively the lateral and vertical fracturing of the mass of exposed and compressed subsoil, down and
fracturing it before the protected topsoil is reapplied on the site (see Figure 12); and through, to the bottom of impact, prior to the replacement of the topsoil layer. (Any oversize rocks
which are uplifted to the subsoil surface during the deep ripping phase are picked and removed.)
2) Decompact (deep subsoil), simultaneously through the restored topsoil layer and the upper half Like the heavy-duty class of implement for the first phase, the decompaction (deep subsoiling) of
of the affected subsoil (Figure 13). The second phase, “decompaction,” mitigates the partial Phase 2 is conducted with the heavy-duty version of the deep subsoiler. More preferable is the
recompaction which occurs during the heavy process of topsoil spreading/grading. Prior to deep angled-leg variety of deep subsoiler (shown in Figures 8 and 13). It minimizes the inversion of the
ripping and decompacting the site, all construction activity, including construction equipment and subsoil and topsoil layers while laterally and vertically fracturing the upper half of the previously
material storage, site cleanup and trafficking (Figure 14), should be finished; and the site closed off ripped subsoil layer and all of the topsoil layer by delivering a momentary, wave-like “lifting and
to further disturbance. Likewise, once the practice is underway and the area’s soil permeability and shattering” action up through the soil layers as it is pulled.
5 6
Page 634 of 1493
Page 635
Pulling-Power of Equipment Depth and Patterns of Movement
Use the following rule of thumb for tractor horsepower (hp) whenever deep ripping and As previously noted both Phase 1 Deep Ripping through significantly compressed, exposed subsoil
decompacting a significantly impacted site: For both types of implement, have at least 40 hp of and Phase 2 Decompaction (deep subsoiling) through the replaced topsoil and upper subsoil need
tractor pull available for each mounted shank/ leg. to be performed at maximum capable depth of each implement. With an implement’s guide wheels
attached, some have a “normal” maximum operating depth of 18 inches, while others may go
Using the examples of a 3-shank and a 5-shank implement, the respective tractors should have 120 deeper. In many situations, however, the tractor/implement operator must first remove the guide
and 200 hp available for fracturing down to the final depth of 20-to-24 inches per phase. Final wheels and other non essential elements from the implement. This adapts the ripper or the deep
depth for the deep ripping in Phase 1 is achieved incrementally by a progressive series of passes subsoiler for skillful pulling with its frame only a few inches above surface, while the shanks or
(see Depth and Patterns of Movement, below); while for Phase 2, the full operating depth of the legs, fracture the soil material 20-to-24 inches deep.
deep subsoiler is applied from the beginning.
There may be construction sites where the depth of the exposed subsoil’s compression is moderate,
The operating speed for pulling both types of e.g.: 12 inches, rather than deep. This can be verified by using a ¾ inch cone penetrometer and a
implement should not exceed 2 to 3 mph. At shovel to test the subsoil for its level of compaction, incrementally, every three inches of
this slow and managed rate of operating speed, increasing depth. Once the full thickness of the subsoil’s compacted zone is finally “pieced” and
maximum functional performance is sustained there is a significant drop in the psi measurements of the soil penetrometer, the depth/thickness of
by the tractor and the implement performing the compaction is determined. This is repeated at several representative locations of the construction
soil fracturing. Referring to Figure 8, the site. If the thickness of the site’s subsoil compaction is verified as, for example, ten inches, then
implement is the 6-leg version of the deep the Phase 1 Deep Ripping can be correspondingly reduced to the implement’s minimum operable
angled-leg subsoiler. Its two outside legs are depth of 12 inches. However, the Phase 2 simultaneous Decompation (subsoiling) of an 11 inch
“chained up” so that only four legs will be thick layer of replaced topsoil and the upper subsoil should run at the subsoiling implements full
engaged (at the maximum depth), requiring no operating depth.
less than 160 hp, (rather than 240 hp) of pull.
The 4-wheel drive, articulated-frame tractor in
Figure 8 is 174 hp. It will be decompacting this Fig. 8. A deep, angled-leg subsoiler, ideal for
unobstructed, former construction access area Phase 2 decompaction of after the topsoil layer
simultaneously through 11 inches of replaced is graded on top of the ripped subsoil.
topsoil and the upper 12 inches of the
previously deep-ripped subsoil. In constricted
areas of Phase 1) Deep Ripping, a medium-size
tractor with adequate hp, such as the one in
Figure 9 pulling a 3-shank deep ripper, may be
more maneuverable.
Some industrial-grade variations of ripping Fig. 10. An early pass with a 3-shank deep Fig. 11. A repeat run of the 3-shank ripper
implements are attached to power graders and ripper penetrating only 8 inches into this along the same patterned pass area as Fig. 9;
bulldozers. Although highly durable, they are worksite’s severely compressed subsoil. here, incrementally reaching 18 of the needed
generally not recommended. Typically, the 22 inches of subsoil fracture.
shanks or “teeth” of these rippers are too short
and stout; and they are mounted too far apart to
achieve the well-distributed type of lateral and Fig. 9. This medium tractor is pulling a 3- Typically, three separate series (patterns) are used for both the Phase 1 Deep Ripping and the
vertical fracturing of the soil materials shank deep ripper. The severely compacted Phase 2 Decompaction on significantly compacted sites. For Phase 1, each series begins with a
necessary to restore soil permeability and construction access corridor is narrow, and the moderate depth of rip and, by repeat-pass, continues until full depth is reached. Phase 2 applies the
infiltration. In addition, the power graders and 120 hp tractor is more maneuverable for Phase full depth of Decompation (subsoiling), from the beginning.
bulldozers, as pullers, are far less maneuverable 1 deep ripping (subsoil fracturing), here.
for turns and patterns than the tractor. Every separate series (pattern) consists of parallel, forward-and-return runs, with each progressive
7 8
Page 635 of 1493
Page 636
pass of the implement’s legs or shanks evenly staggered between those from the previous pass.
This compensates for the shank or leg-spacing on the implement, e.g., with 24-to-30 inches Ɣ A second series of passes makes a broad “S” shaped pattern of rips, continually
between each shank or leg. The staggered return pass ensures lateral and vertical fracturing and gradually alternating the “S” curves between opposite edges inside the
actuated every 12 to 15 inches across the densely compressed soil mass. compacted corridor.
Large, Unobstructed Areas Ɣ The third and final series again uses the broad, alternating S pattern, but it is
For larger easy areas, use the standard patterns of movement: “flip-flopped” to continually cross the previous S pattern along the corridor’s
centerline. This final series of the S pattern curves back along the edge areas
Ɣ The first series (pattern) of passes is applied lengthwise, parallel with the longest skipped by the second series.
spread of the site; gradually progressing across the site’s width, with each
successive pass. Maintenance and Cost
Ɣ The second series runs obliquely, crossing the first series at an angle of Once the two-phase practice of Deep Ripping and Decompation is completed, two items are
about 45 degrees. essential for maintaining a site’s soil porosity and permeability for infiltration. They are: planting
and maintaining the appropriate ground cover with deep roots to maintain the soil structure (see
Ɣ The third series runs at right angle (or 90 degrees), to the first series to complete Figure 15); and keeping the site free of traffic or other weight loads.
the fracturing and shattering on severely compacted sites, and avoid leaving large
unbroken blocks of compressed soil material. (In certain instances, the third series Note that site-specific choice of an appropriate vegetative ground-cover seed mix, including the
may be optional, depending on how thoroughly the first two series loosen the proper seeding ratio of one or more perennial species with a deep taproot system and the proper
material and eliminate large chunks/blocks of material as verified by tests with a ¾- amount of lime and soil nutrients (fertilizer mix) adapted to the soil-needs, are basic to the final
inch cone penetrometer.) practice of landscaping, i.e: surface tillage, seeding/planting/fertilizing and culti-packing or
mulching is applied. The "maintenance" of an effectively deep-ripped and decompacted area is
generally limited to the successful perennial (long-term) landscape ground cover; as long as no
weight-bearing force of soil compaction is applied.
Fig. 13. The same deep, angled-leg subsoiler
Fig. 12. Moderately dry topsoil is being
shown in Fig. 7 is engaged at maximum
replaced on the affected site now that Phase 1
depth for Phase 2, decompaction (deep
deep ripping of the compressed subsoil is
soiling), of the replaced topsoil and the upper Fig. 15. The same site as Fig. 14 after deep
complete. Fig. 14. The severely compacted soil of a
subsoil materials. ripping of the exposed subsoil, topsoil
temporary construction yard used daily by replacement, decompaction through the
heavy equipment for four months; shown topsoil and upper subsoil and final surface
before deep ripping, topsoil replacement, and tillage and revegetation to maintain soil
Corridors
decompaction. permeability and infiltration.
In long corridors of limited width and less maneuverability than larger sites, e.g.: along
compacted areas used as temporary construction access, a modified series of pattern passes
are used.
Ɣ First, apply the same initial lengthwise, parallel series of passes described above.
9 10
Page 636 of 1493
Page 637
The Deep Ripping and Decompaction practice is, by necessity, more extensive than periodic Resources
subsoiling of farmland.The cost of deep ripping and decompacting (deep subsoiling), will vary
according to the depth and severity of soil-material compression and the relative amount of Publications:ȱ
tractor and implement time that is required. In some instances, depending on open ȣȱAmericanȱȱSocietyȱofȱȱAgriculturalȱEngineers.ȱ1971.ȱȱCompactionȱofȱȱAgriculturalȱȱSoils.ȱȱASAE.ȱ
maneuverability, two-to-three acres of compacted project area may be deep-ripped in one day. In ȱ
other situations of more severe compaction and - or less maneuverability, as little as one acre may ȣȱBrady,ȱN.C.,ȱandȱR.R.ȱWeil.ȱ2002.ȱȱTheȱȱNatureȱȱandȱȱPropertiesȱȱofȱȱSoils.ȱ13thȱed.ȱPearsonȱEducation,ȱInc.ȱ
be fully ripped in a day. Generally, if the Phase 1) Deep Ripping is fully effective, the Phase 2) ȱ
Decompaction should be completed in 2/3 to 3/4 of the time required for Phase 1. ȣȱBaver,ȱL.D.ȱ1948.ȱSoilȱPhysics.ȱJohnȱWileyȱ&ȱSons.ȱ
ȱ
Using the example of two acres of Phase 1) Deep Ripping in one day, at $1800 per day, the net ȣȱCarpachi,ȱN.ȱ1987ȱ(1995ȱfifthȱprinting).ȱExcavationȱandȱGradingȱHandbook,ȱRevised.ȱȱ2ndȱed.ȱCraftsmanȱBookȱ
cost is $900 per acre. If the Phase 2) Decompacting or deep subsoiling takes 3/4 the time as Phase Companyȱ
1, it costs $675 per acre for a combined total of $1575 per acre to complete the practice (these ȣȱEllis,ȱB.ȱ(Editor).ȱ1997.ȱȱSafeȱ&ȱEasyȱLawnȱCare:ȱȱTheȱCompleteȱGuideȱtoȱOrganicȱLowȱMaintenanceȱLawn.ȱȱ
figures do not include the cost of the separate practice of topsoil stripping and replacement). Due HoughtonȱMifflin.ȱ
to the many variables, it must be recognized that cost will be determined by the specific conditions ȱ
or constraints of the site and the availability of proper equipment. ȣȱ Harpstead,ȱ M.I.,ȱ T.J.ȱ Sauer,ȱ andȱ W.F.ȱ Bennett.ȱ 2001.ȱ ȱ Soilȱ Scienceȱ Simplified.ȱ 4thȱ ed.ȱ Iowaȱ Stateȱ Universityȱȱ
Press.ȱ
ȱ
ȣȱ ȱ Magdoff,ȱ F.,ȱ ȱ andȱ ȱ H.ȱ vanȱ Es.ȱ ȱ 2000.ȱ ȱ Buildingȱ Soilsȱ ȱ forȱ ȱ Betterȱ Crops.ȱ 2ndȱ ed.ȱ Sustainableȱ Agriculturalȱ
Networksȱ
ȱ
ȣȱȱMcCarthy,ȱD.F.ȱ1993.ȱEssentialsȱofȱSoilȱMechanicsȱandȱFoundations,ȱBasicȱGeotechnicsȱ4thȱed.ȱRegents/Prenticeȱ
Hall.ȱ
ȱ
ȣȱȱȱȱȱȱPlaster,ȱE.J.ȱ1992.ȱSoilȱScienceȱ&ȱManagement.ȱ3rdȱed.ȱDelmarȱPublishers.ȱ
ȱ
ȣȱ ȱ ȱ Unionȱ Gasȱ Limited,ȱ Ontario,ȱ Canada.ȱ 1984.ȱ Rehabilitationȱ ofȱ Agriculturalȱ Lands,ȱ DawnȬKerwoodȱ ȱ Loopȱȱ
Pipeline;ȱȱȱTechnicalȱȱȱReport.ȱȱȱEcologicalȱȱȱServicesȱȱforȱȱPlanning,ȱȱLtd.;ȱRobinson,ȱMerrittȱ&ȱDevries,ȱ
Ltd.ȱandȱSmith,ȱHoffmanȱAssociates,ȱLtd.ȱ
ȱ
ȣȱȱȱUSȱDepartmentȱofȱAgricultureȱinȱcooperationȱwithȱCornellȱUniversityȱAgriculturalȱExperimentȱȱStation.ȱȱ
Variousȱyears.ȱȱSoilȱȱSurveyȱofȱȱ(variousȱnames)ȱȱCounty,ȱȱNewȱYork.ȱUSDA.ȱ
ȱ
InternetȱAccess:ȱ
ȣȱȱȱȱExamplesȱofȱimplements:ȱȱ
ȱVȬRippers.ȱȱAccessȱbyȱȱinternetȱsearchȱofȱJohnȱDeereȱAgȱȬNewȱEquipmentȱȱȱforȱȱ915ȱȱ(largerȬframeȱmodel)ȱȱVȬ
Rippe;ȱȱand,ȱȱȱforȱ913ȱȱ(smallerȬframeȱmodel)ȱVȬRipper.ȱȱDeep,ȱangledȬlegȱsubsoiler.ȱȱAccessȱȱbyȱȱinternetȱ
searchȱȱof:ȱBighamȱȱBrothersȱShearȱBoltȱȱParatillȬSubsoiler.ȱ
http://salesmanual.deere.com/sales/salesmanual/en_NA/primary_tillage/2008/feature/rippers/915v_pattern_frame.html?sbu=a
g&link=prodcat LastȱvisitedȱMarchȱ08.ȱ
ȱ
ȣȱ Soilsȱ dataȱ ofȱ USDAȱ Naturalȱ Resourcesȱ Conservationȱ Service.ȱ NRCSȱ Webȱ Soilȱ Survey.ȱȱȱȱȱȱȱȱȱȱȱȱȱȱ
http://websoilsurvey.nrcs.usda.gov/app/ȱȱȱandȱȱUSDAȬNRCSȱȱOfficialȱȱSoilȱȱSeriesȱDescriptions;ȱViewȱbyȱ
Name.ȱhttp://ortho.ftw.nrcs.usda.gov/cgiȬbin/osd/osdname.cgiȱ.ȱLastȱvisitedȱJan.ȱ08.ȱ
ȱ
ȣȱȱSoilȱȱpenetrometerȱȱinformation.ȱȱAccessȱȱbyȱȱȱinternetȱȱsearchesȱȱof:ȱȱȱDiagnosingȱSoilȱCompactionȱȱȱusingȱȱaȱ
Penetrometerȱ(soilȱcompactionȱtester),ȱPSUȱExtension;ȱȱasȱȱwellȱȱasȱDickeyȬjohnȱSoilȱCompactionȱTester.ȱ
http://www.dickey-johnproducts.com/pdf/SoilCompactionTest.pdf and http://cropsoil.psu.edu/Extension/Facts/uc178pdf Lastȱ
visitedȱSept.ȱ07ȱ
11 12
Page 637 of 1493
Page 638
Page 638 of 1493
Page 639
Appendix f:
Labella certifying
professionals letter
Page 639 of 1493
Page 640
Page 640 of 1493
Page 641
February 21, 2025
RE: LaBella Certifying Professionals for NYSDEC SPDES GP-0-25-001
To Whom it May Concern:
In accordance with the NYSDEC SPDES General Permit GP-0-25-001, Part VII.J.2, Kristopher Winkler,
PE, a New York State Qualified Professional employed by LaBella Associates, is duly authorized to sign
and seal Stormwater Pollution Prevention Plans (SWPPPs), Notice of Intents (NOIs) and Notice of
Terminations (NOTs).
Respectfully submitted,
LaBella Associates
Timothy Webber Kristopher Winkler, PE
Vice President, Civil Division Director Senior Civil Engineer
Team Leader
Page 641 of 1493
Page 642
Page 642 of 1493
Page 643
Appendix G:
Nysdec spdes general permit
gp-0-25-001
Page 643 of 1493
Page 644
Page 644 of 1493
Page 645
Page 645 of 1493
Page 646
Page 646 of 1493
Page 647
Page 647 of 1493
Page 648
Page 648 of 1493
Page 649
Page 649 of 1493
Page 650
Page 650 of 1493
Page 651
Page 651 of 1493
Page 652
Page 652 of 1493
Page 653
Page 653 of 1493
Page 654
Page 654 of 1493
Page 655
Page 655 of 1493
Page 656
Page 656 of 1493
Page 657
Page 657 of 1493
Page 658
Page 658 of 1493
Page 659
Page 659 of 1493
Page 660
Page 660 of 1493
Page 661
Page 661 of 1493
Page 662
Page 662 of 1493
Page 663
Page 663 of 1493
Page 664
Page 664 of 1493
Page 665
Page 665 of 1493
Page 666
Page 666 of 1493
Page 667
Page 667 of 1493
Page 668
Page 668 of 1493
Page 669
Page 669 of 1493
Page 670
Page 670 of 1493
Page 671
Page 671 of 1493
Page 672
Page 672 of 1493
Page 673
Page 673 of 1493
Page 674
Page 674 of 1493
Page 675
Page 675 of 1493
Page 676
Page 676 of 1493
Page 677
Page 677 of 1493
Page 678
Page 678 of 1493
Page 679
Page 679 of 1493
Page 680
Page 680 of 1493
Page 681
Page 681 of 1493
Page 682
Page 682 of 1493
Page 683
Page 683 of 1493
Page 684
Page 684 of 1493
Page 685
Page 685 of 1493
Page 686
Page 686 of 1493
Page 687
Page 687 of 1493
Page 688
Page 688 of 1493
Page 689
Page 689 of 1493
Page 690
Page 690 of 1493
Page 691
0.0
0.0
NOT FOR CONSTRUCTION
0.0 Luminaire Schedule
0.0
0.0 0.0 Symbol Tag Label Arrangement Description LLF Luminaire Luminaire Total Mounting BUG Rating
0.0
0.0 Lumens Watts Watts Height
0.0
0.0
0.0 0.0 S1 LITHONIA RSX1 LED P1 40K R3 Single RSX1 LED P1 40K R3 0.850 7096 51.34 718.76 20 B1-U0-G2
0.0 0.0
0.0 S2 LITHONIA RSX1 LED P1 40K R5 Back-Back RSX1 LED P1 40K R5 0.850 7284 51.34 410.72 20 B3-U0-G2
0.0
0.0 S3 LITHONIA RSX1 LED P1 40K R3 Single RSX1 LED P1 40K R3 0.850 7096 51.34 718.76 10 B1-U0-G2
0.0 0.0
0.0 0.0
0.0 0.0 300 Pearl Street, Suite 130
0.0 0.0
0.0 0.0 Calculation Summary
0.0
0.0 0.0
0.0
Label CalcType Units Avg Max Min Avg/Min Max/Min Max/Avg Buffalo, NY 14202
0.0 0.0
0.0
0.0 0.0 0.0 0.1
0.1 0.1 Parking Lot Illuminance Fc 0.86 5.0 0.0 N.A. N.A. 5.81 716-551-6281
0.0 0.1 0.1
0.1 0.1
0.1
0.1
0.1 0.1
0.1 Isoline Legend labellapc.com
0.0 0.2 0.1
0.0 0.1 0.1 Illuminance (Fc)
0.0 0.1 0.2 0.2
0.0 0.2 0.2 0.1
0.2 0.3 0.1 Color Value
0.3 0.1
0.1 0.4 0.1 0.1
0.0 0.4 0.2
0.0 0.1 0.2 0.4 0.3
0.0 0.4 0.4 0.1 0.5
0.0 0.5 0.1
0.6 0.1 1
0.6 0.2
0.1 0.7
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
0.1 0.4 0.6 0.3
0.0 0.1 0.2 0.5 0.1
0.0 0.1
0.0 0.8 0.5 0.2
1.0 0.9 0.2
1.1 1.1 0.3
0.8 1.0 1.0
0.1 0.3 0.5
0.1 0.2 0.1
0.0 0.2
0.0 0.6 0.4 0.3
1.2 0.9 0.4
1.7 1.4 0.4
1.5 1.7
0.1 0.5 0.8 1.2 0.0
0.1 0.3 0.3 0.2
0.1 0.5 0.4
0.0 0.5 0.4 0.5
1.2 0.8 0.6
1.8
S1 0.0 EXP: EXP:
0.2 0.4 0.4 0.5 0.8 1.4 2.3 2.7 2.0 1.3 0.8 0.1
0.2 0.3 0.4 0.2
0.1 0.8 0.6
0.0 0.4 0.6 0.9
0.0 1.0
0.4 0.1 CERTIFICATE OF AUTHORIZATION NUMBER:
0.4 0.3 1.0 1.2 0.8 0.5 0.3 0.3 0.1
0.3 0.5 0.5 0.3 PROFESSIONAL ENGINEERING: 0021272
0.1 0.9 0.9
0.1 0.3 0.6 1.3 LAND SURVEYING: 0021271
0.0 1.1
0.1 GEOLOGICAL: 0021659
0.7 0.5 0.0 0.1 0.2 0.2
0.4 0.8 0.9 0.4
0.2 1.0 1.3
0.1 0.3 0.6
0.0 0.0 0.1
0.8 0.1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
0.5 0.9 0.0 0.3
0.2 0.9 1.2 2.5 0.6 Sec. 7307, for any person, unless acting under the direction of a licensed
0.7 1.1 1.6 1.7
0.0
0.1
0.0 0.1 0.3 S1 architect, professional engineer, or land surveyor, to alter an item in any
0.9 0.0 way. If an item bearing the seal of an architect, engineer, or land surveyor
0.5 1.4 0.0 0.0
0.3 1.0 1.5 2.7 0.7 is altered; the altering architect, engineer, or land surveyor shall affix to
1.1 1.7 1.5
0.1 0.3 0.7 the item their seal and notation "altered by" followed by their signature and
0.0 0.0 0.1
0.0 date of such alteration, and a specific description of the alteration.
0.0 0.1
0.6 2.1 0.9 0.0 0.0 0.2
0.3 1.1 1.9 1.8 0.4
0.1 0.7 1.0 1.5 0.9
0.0 S1 0.1 0.4
0.0 0.1 © 2024
2026 LaBella Associates
0.0 0.1
0.0 0.7 2.2 0.9 0.0 0.1
0.3 1.1 1.9 1.2 0.2
0.1 1.0 1.3 0.5
0.4 0.7
0.0 0.1 0.2
0.0
0.0 0.0
0.0 1.5 0.0 0.1
0.0 1.1 1.5 0.1
1.0 0.8 0.3
0.7 1.0
0.2 0.4
0.1
0.0 0.0
0.0
0.0
0.0
1.0 1.2
0.9 0.0 0.1
0.0 HOME LEASING
0.0 0.0 0.7 0.5 0.2
0.0 0.0
0.0
0.2 0.4 0.6 0.8 0.5 75 S CLINTON AVE SUITE 700,
0.0 0.0 0.1
0.0 0.0 0.0 ROCHESTER, NEW YORK 14604
0.0 0.0 0.0 0.0
0.0 0.0 0.6 0.0 0.1
0.0 0.0 0.7 0.5 0.2
0.0 0.0 0.6 0.8 0.5
0.0 0.2 0.4
0.0 0.0 0.1
0.0 0.0 0.0 0.5
0.0 0.0 0.0 0.6 0.0
0.0 0.0 0.0 0.3 0.0 0.1
0.0 0.0 1.0 0.2
0.0 0.0 0.4 0.7 1.0 0.6
0.0 0.0 0.1 0.2
0.0 0.0 0.0 0.3
0.0 0.0 0.0 0.3
0.0 0.0 0.0 0.3 0.2 0.0 0.1
0.0 0.0 0.0 0.2 0.1
0.0 0.0 1.3 0.2
0.0 0.0 0.1 0.7 1.0 0.9
0.0 0.0 0.1 0.2 0.4
0.0 0.0 0.1
0.0 0.0 0.0 0.2
0.0 0.0 0.2 0.1
0.0 0.0 0.0 0.0 0.2
0.0 0.4
0.0 0.7 1.1 1.5 1.2
0.2 0.4
0.1
0.0 0.1
0.0 0.0 0.3
0.0 0.6
0.0 1.1 1.9 S1 1.5
0.0 0.2 0.4 0.8
0.1
0.0
0.0
0.0 PROPOSED 0.0
1.2 1.9 1.2
0.6
0.3
0.1
0.0 0.4 0.8
0.2
0.0
0.0
0.0
3-STORY 0.0
0.1
0.2
0.1
0.0 1.6 0.3
1.1 0.7
0.0
0.0
BUILDING 0.1 0.2 0.4 0.8 1.6
0.0 0.0 0.1
0.0
0.0
0.0
0.0
0.0
± 25,000 SF FOOTPRINT 0.1 0.2 0.5 0.8 1.1 1.3
0.9
0.4
0.1
0.0
0.1
0.1 0.1
0.9 0.2
0.1
0.1 WEST SENECA APARTMENTS
0.0 0.5 0.8 1.0 0.6
0.0 0.1 0.2
0.0 0.1 2544 CLINTON ST,
0.1
0.1 0.1 0.1
0.1
0.0 WEST SENECA, NY 14224
0.1 0.8 0.7 0.2
0.1 0.2 0.5 0.7 0.4
0.1 0.1 0.2
0.0 0.2 0.1
0.0 0.2
0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.2 0.0
0.1
0.1 0.8 0.7 0.1
0.1 0.3 0.5 0.7 0.4
0.1 0.3 0.3
0.0 0.3 0.3 0.2 0.2
0.2 0.2 0.3 0.3
0.3 0.2 0.3 0.3 0.3 0.2 0.2 0.1 0.0
0.3 0.3 0.2 0.3 0.1
0.3 0.3 0.2 0.2 1.1 1.0 0.1
0.2 0.3 0.3 0.3 0.2 0.6 0.9 0.5
0.1 0.3 0.4 0.3 0.2 0.3
0.1 0.4
0.1 0.4 0.4 0.4
0.3 0.4 0.5 0.4
S
0.4 0.3 0.3 0.5 0.5 0.3 0.2 0.0
0.5 0.4 0.4 0.5 0.1
0.5 0.5 0.3 0.4 1.3 0.2
0.3 0.5 0.5 0.4 0.4 0.3 0.9 1.2 0.6
0.2 0.4 0.6 0.5 0.3 0.6
0.2 0.7 0.6 0.2 0.2
0.1 0.6 0.7 0.5 0.4 0.3 1 06/23/2026 PLANNING BOARD COMMENTS
0.5 0.6 0.7 0.6
0.5 0.5 0.7 0.8 0.1
0.6 0.5 0.6 0.7 0.1 NO: DATE: DESCRIPTION:
0.8 0.7 0.5 0.5 1.9 0.3
0.7 0.8 0.8 0.5 0.4 1.0 1.3 0.8
0.3 0.6 0.7 0.6 0.4 0.6
0.2 0.9 0.8 0.3 0.2 2.0 Revisions
0.1 0.8 0.9 0.9 0.5 0.4
0.7 0.7 0.8 0.7
0.1 0.6 0.6 1.0 0.9
0.8 0.7 0.8 0.9 1.0 0.2
1.0 0.9 0.6 0.7 2.5 0.5
B:\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Electrical\E100 SITE PLAN.dwg
1.0 1.1 0.6 0.6 1.1 1.5 0.9
0.4 0.8 0.9 0.8 0.7 0.4 0.6 S1 PROJECT NUMBER:
0.3 0.6 1.1 1.0 0.3 0.3 2.5
0.2 1.0 1.2 1.2 0.7 0.5
0.1 0.7 0.8 0.9
1.4 1.3 1.0 0.8 2241067
0.9 0.8 0.7 1.1 1.3 0.2
1.4 1.1 0.8 0.9 0.4
1.5 1.5 0.6 0.7 1.4 2.5
0.6 0.9 1.2 0.8 0.7 0.6 1.0 0.7
0.7 1.2 1.0 0.3 0.4 1.8 DRAWN BY:
0.4
1.5 1.6 1.5 0.5 0.4
0.2 1.0 1.3 1.0 0.8 EMM
KBB
/ JBB
0.1 0.8 0.9 1.6 1.3
0.9 0.8 1.4 1.6 1.7 0.1
1.3 1.0 0.9 1.1 0.2 REVIEWED BY:
1.7 1.6 0.7 0.8 1.3 1.7
0.6 1.5 1.7 0.9 0.7 0.6 1.0 0.3 SRVCCL
/ DPB
0.8 1.1 1.4 1.1 0.3 0.4 1.0
0.4 1.7 1.7 0.5 0.3
0.1 S2 1.5 1.7 S2 S2 0.7 0.6
0.1 0.4 0.5 1.1 1.7 0.8
0.5 0.4 1.7 1.8 ISSUED FOR:
0.7 0.5 0.9 1.1 1.6 0.1
0.9 0.7 1.1 0.1
0.4 1.1 1.5 1.7 1.8
1.0 0.5 0.4 0.3
0.5 0.7 1.0 1.2 0.2 SITE PLAN APPROVAL
0.4 0.8 1.7 1.4 0.7 0.5 0.6
0.3 1.7 1.7 1.2 0.9
0.2 1.1 1.5 1.5 1.3
0.8 0.8 1.0 1.7 1.7
1.0 0.9 1.5 1.7 0.0 DATE:
1.6 1.3 0.7 0.9 1.1 0.1
0.7 1.0 1.4 1.6 1.6
1.0 0.8 0.7 0.6
0.6 0.7 0.8 0.8
0.3
0.1 4/20/2026
0.5 0.8 1.5 1.2 0.9 0.7
0.3 1.3 1.5 1.6 1.4 1.2
0.2 0.9 1.0 1.4 1.3
0.7 0.8 1.6 1.5
0.9 0.8 1.0 1.3 1.5 0.0 DRAWING NAME:
1.3 1.1 0.7 0.8 0.0
1.3 1.4 0.6 0.6 0.7 0.6 0.1
0.7 0.9 1.1 0.8 0.7 0.8 0.8 0.2
0.5 1.1 1.0 1.2 1.0 0.4
0.3 1.2 1.2 1.6 1.4
0.2 0.8 0.9 1.0 1.2 1.3
0.6 0.7 1.1 1.1
0.8 0.7 0.9 1.1
1.0 0.9 0.6 0.7 0.8 0.0
0.9 1.0 1.0 0.5 0.5 0.7 0.6 0.1
0.6 0.8 0.8 0.7 0.6 1.1 0.9 0.2
0.5 0.9 0.9 1.5 1.3 0.3
0.4 0.8 0.9 1.6 1.7
0.2 0.6 0.7 0.9 0.9 1.2
0.5 0.5 0.8 0.9
0.6 0.5 0.6 0.7
0.7
0.7
0.3 0.9 0.9 1.0 0.9 0.8
0.6 0.7 0.6 0.6 0.5 0.5 0.4 0.4 0.5 0.5
2.2 2.4 1.8 1.3 1.1 0.9 0.6
0.4
0.2
0.1
0.0
SITE PHOTOMETRIC PLAN
0.5 0.6 0.8 1.3
0.3 1.4 1.4 0.4 0.5 0.6 0.6 0.6
2.4 2.1 1.1 0.7 0.5 0.5 0.4 0.4
0.3 0.3 0.3 0.3 0.4 0.5 0.5 S1
1.3 1.1 0.7
0.2
0.1
0.0 MATCH TO SHEET: E052
0.2 0.4 0.4 0.4 2.2 1.6
1.4 0.4 0.4 2.6 0.4
0.4 0.4 0.4 0.4 0.7
0.5 4.0 4.4 0.3 0.3 0.4 0.4
0.2 0.3 0.3 0.4 1.3 2.1
0.6 0.4 0.3 0.3 0.3 0.0
3.6 1.4 0.2 0.2 0.8 0.1
5.0 0.2 0.2 1.3 1.1 0.2
0.1 0.3 0.3 0.2 0.3 1.3 1.4 0.4
1.4 0.3 0.3 0.5
0.5 0.2 0.2 0.2
0.2 5.6 10.2 0.2 0.1 0.7
3.4 1.3 0.5
0.2 0.2 0.1 0.1 0.5 0.7 0.0
DRAWING NUMBER:
8.0 0.3 0.3 0.2 0.2 0.2 0.3 0.1
S3 0.5 0.2 0.2 1.1 0.9
1.9 0.2 0.2 0.2 0.2 0.5 0.8 1.1 0.2
0.7 0.2 0.2 0.2 0.5
0.2
6/23/2026 1:56:56 PM
N
1 SITE PHOTOMETRIC PLAN
E051 SCALE: 1" = 20'
E051
Page 691 of 1493
Page 692
0.8 0.9 0.7 0.6 1.1 0.9 0.2
0.5 0.6 0.9 0.8 1.5 1.3 0.3
0.4 0.9 0.9 1.6 1.7
0.8 1.2
NOT FOR CONSTRUCTION
0.2 0.5 0.6 0.7 0.9 0.9
0.5 0.5 0.8 0.9
0.7 0.6 0.6 0.7 0.0
0.9 0.8 0.4 0.5 0.5
0.9 1.0 0.5 0.4 0.9 0.6 0.1
0.9 0.6 0.5 1.3 1.1 0.2
0.3
0.7 0.6 2.4 1.8 0.4
0.7 0.6 0.6 0.8 1.3 2.2
0.3 1.4 1.4 0.5 0.5 0.6 0.6
0.4 0.6
2.4 2.1 1.1 0.7 0.5 0.5 0.4 0.4
0.3 0.3 0.3 0.3 0.4 0.5 0.5 S1
1.1 0.7 0.1
0.0 MATCH TO SHEET: E051
0.2 0.4 0.4 0.4 2.2 1.6 1.3 0.2
1.4 0.4 0.4 2.6 0.4
0.4 0.4 0.4 0.7
0.5 4.0 4.4 0.3 0.3 0.4 0.4 0.4
0.2 0.3 0.3 0.4 1.3 2.1
0.6 0.4 0.3 0.3 0.3 0.0 300 Pearl Street, Suite 130
3.6 1.4 0.2 0.2 0.8 0.1
5.0 0.2 0.2 1.3 1.1 0.2
0.1 0.3 0.2 0.3 1.3 1.4
0.5
1.4 0.2 0.3
0.3 0.3 0.5
0.4 Buffalo, NY 14202
0.2 5.6 10.2 0.2 0.2 0.1 0.2
8.0 3.4 1.3 0.5
0.3 0.2 0.2
0.2 0.1 0.1
0.3 0.5 0.7 0.7
0.0 716-551-6281
0.3 C0 0.2 0.2 0.9 0.1
1.9
S3 0.5
0.2 0.2 0.2
0.2 0.2 0.2
0.5 0.8 1.1 1.1 0.2
0.2 0.2 0.5
0.2
0.7 0.4 0.1 0.1 0.2
0.1 0.1 0.2 labellapc.com
0.1 0.5 0.1 0.1 0.1 0.3
0.7 0.1 0.1 0.1 0.1 0.4
1.3 0.2 0.2 0.1 0.1 0.1 0.2 0.1
1.5 0.1 0.1 1.2 1.2
0.4 0.1 0.1 0.1 0.6 0.9 0.2
0.1 0.1 0.1 0.1 0.3 0.6
0.1 0.1 0.1 0.1 0.1
0.0 0.2 0.1 0.1 0.2
0.2 0.1D S 0.1 0.1 0.2
0.4 0.1 0.1 0.1 0.1 0.1 0.1
0.3 0.1 0.1 0.8 1.2 1.5 0.3
0.2 0.1 0.1 0.1 0.1 0.3 0.5
0.1 0.1 0.1 0.7
0.0 0.1 0.1 0.0 0.1 1.8
0.0 0.1 0.0 0.0
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
0.1 0.0 0.1 0.1
0.1 0.0 0.1
0.0 0.0 0.1 2.1 0.2
0.1 0.0 0.0
0.5 1.0 1.3 0.5
0.0 0.0 0.0 0.2 0.9
0.0
0.0 0.0
0.0
0.0 0.0 0.0
0.1
S1 2.4
0.0 0.0 0.1 0.1
0.0 0.0 0.0 0.1 0.0
0.0 0.0 1.4 2.5 0.5
0.0 0.0 0.0 0.3 0.6 1.0 0.8
0.0 0.0 0.0 2.2
0.0 0.0 0.0 2.1
0.0 0.0 0.0 0.1
0.0 0.0 0.1 1.3
0.0 0.1 0.1
0.0 0.0 0.0
0.0 0.0 0.0 1.0 0.3
0.0 0.3 0.6 0.5
0.0 0.0 0.0 1.3
0.0 0.0 0.0 1.7 EXP: EXP:
0.0 0.0 0.0 0.1 0.2 1.3
0.0 0.1 0.1
0.0 0.0 0.1
0.0 0.0 0.0 1.0
0.0 0.0 0.4 0.7 0.2
0.0 0.0 0.7
0.0 0.0 0.0 1.2
0.0 0.0 0.0 1.2 CERTIFICATE OF AUTHORIZATION NUMBER:
0.0 0.1 0.2
0.0 0.0 DS
0.0 0.0 0.1 PROFESSIONAL ENGINEERING: 0021272
0.0 0.0 0.0 0.1
0.0 0.0 0.0 0.0 0.0 0.9 1.1 LAND SURVEYING: 0021271
0.0 0.0 0.5 0.7 0.4
0.0 0.0
0.0 0.0 0.8 GEOLOGICAL: 0021659
0.0 0.0 0.0 0.5 1.0
0.0 0.0 0.0 0.3 0.3 1.1
0.0 0.0 0.0 0.1 0.2
0.0 0.0 0.0 0.0 0.1 1.1
0.0 0.0 1.1 1.1
0.0 0.0 0.0 0.5
0.0 0.0 0.0 0.7 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
0.0 0.0 0.0 0.9
0.0 0.0 0.7 0.9
0.0 0.0 0.0 0.2 0.4 Sec. 7307, for any person, unless acting under the direction of a licensed
0.0 0.0 0.1 0.1 1.2
0.0 0.1 1.7 1.3 architect, professional engineer, or land surveyor, to alter an item in any
0.0 0.0 0.0 C0 2.0
0.0 0.0 0.3 way. If an item bearing the seal of an architect, engineer, or land surveyor
0.0 0.0 0.0 0.5
0.0 0.0 0.0 1.1 2.3 0.7 is altered; the altering architect, engineer, or land surveyor shall affix to
0.0 0.0 0.0 0.5 0.9
0.0 0.2 0.2 S1
0.0 0.0 0.1 0.1 1.5 1.1 the item their seal and notation "altered by" followed by their signature and
0.1 0.1 0.1 2.5 2.4
0.0 0.0 0.1 0.3 date of such alteration, and a specific description of the alteration.
0.0 0.4 0.0 0.4
0.0 0.0 0.0
0.0 0.6 0.0 0.7 0.6
0.4 0.0 0.0 0.3 0.3 0.8
0.2 0.0 0.0 0.3 0.3 1.1 0.9
0.1 0.2 0.3 2.0 1.6 © 2024
2026 LaBella Associates
0.1 0.2 1.4
0.1 0.1 0.1
0.1 0.7 0.1 0.1 0.2
0.0 0.1 0.4
0.9 0.1 0.1 0.5 0.5 0.5
0.7 0.1 0.1 0.6 0.6 0.9 0.8
0.5 0.5 0.3 0.5 0.5 1.3 1.1
0.4 0.8 0.4 0.8 1.3
0.2 2.2 1.4 0.3 0.4 0.6
0.1 1.4 2.1 0.2 0.1
0.1 0.1 0.2 0.1
S1 0.1 0.1 0.1
0.5
0.3
0.2
0.1
0.2
0.4
0.7
1.0
1.4 1.8 2.3 2.0 1.5 1.0 0.6 0.3
0.2 0.3 0.5 0.6 0.7
0.9
0.8
1.0 1.0 1.0 1.0 0.8 0.7 0.8 1.1 1.0 0.8 0.7
0.1
HOME LEASING
0.2 0.2 0.1 75 S CLINTON AVE SUITE 700,
0.3 0.2 0.3
1.1 0.4
0.8 0.7 0.4 0.6 0.8 0.6 ROCHESTER, NEW YORK 14604
0.5 1.1 1.0 0.8 0.6 0.7
0.3 1.2 1.2 0.8 1.4 1.2
0.1 1.0 1.1 0.5 1.5 1.5
0.3 1.1 1.2 0.1
0.9
0.3 0.1
0.2 0.2 0.2 0.2
0.8 0.8 0.6 0.4 0.3
0.5 0.9 0.8 0.9 0.6 0.4
0.2 0.8 0.9 2.5 1.6 0.4
0.1 0.7 0.7 1.8 2.5 S1 0.3
1.0 1.3 0.3 0.0 Isoline Legend
0.3 0.5 0.6 0.4 0.0
0.2 0.3 0.7 0.1
0.5 0.4 0.3 0.2 1.2 0.1 Illuminance (Fc)
0.3 0.5 0.5 1.9 0.2
0.2 0.5 0.5 1.8 0.2 Value
0.1 0.4 0.4 0.4 0.2 Color
1.0 1.3
0.5 0.7 0.1
0.4 0.4 0.5 0.2 0.1
0.2 0.4 0.2 0.1
0.2 0.5 0.1 0.5
0.1 0.2 0.7 0.1
0.1 0.2 0.6 0.1
0.1 0.4
0.4 0.1 1
0.1 0.3 0.5 0.4 0.3 0.1
0.1 0.2 0.7 0.6 0.1
0.1 0.2 0.3
0.1 0.1 0.0 Calculation Summary
0.0 0.1 0.3
0.0 0.1 0.2
0.1 0.6 0.3 0.1 0.0 Label CalcType Units Avg Max Min Avg/Min Max/Min Max/Avg
C0
0.0 0.3 0.8 0.5 0.2 0.1
0.0 0.2 1.0 0.3 0.1 Parking Lot Illuminance Fc 0.86 5.0 0.0 N.A. N.A. 5.81
0.0 1.1 0.1
0.0 0.1 0.0
0.0 0.1 0.1
0.0 0.1 0.1
0.0 1.2 0.1
0.0 0.5 0.9 0.5 0.1
0.0 0.4 1.5 1.2 0.2
0.0 0.2 0.5
0.0 0.1 0.1 Luminaire Schedule
0.0 0.0 0.1
0.0 0.1
0.0 0.1 Symbol Tag Label Arrangement Description LLF Luminaire Luminaire Total Mounting BUG Rating
0.0 1.3 1.2 0.8 0.1
0.0 0.7 1.8 0.2 Lumens Watts Watts Height
0.1 .8 0.4
0.1 S1 2 S1 LITHONIA RSX1 LED P1 40K R3 Single RSX1 LED P1 40K R3 0.850 7096 51.34 718.76 20 B1-U0-G2
0.0
0.0
2.1 0.8 0.1 S2 LITHONIA RSX1 LED P1 40K R5 Back-Back RSX1 LED P1 40K R5 0.850 7284 51.34 410.72 20 B3-U0-G2
0.8 2.0 1.4 0.1
0.4 0.3 S3 LITHONIA RSX1 LED P1 40K R3 Single RSX1 LED P1 40K R3 0.850 7096 51.34 718.76 10 B1-U0-G2
0.1 0.7
0.0
0.0 WEST SENECA APARTMENTS
0.1
0.8 2.5 2.0 1.6 0.1 2544 CLINTON ST,
0.3 0.2
0.1 2.2 0.7 0.0
0.0 WEST SENECA, NY 14224
0.0
0.1
0.9 2.1 1.8 0.1
0.3 2.1 0.2
0.1 1.8 0.7
0.0 0.0
0.0
0.1
0.9 2.1 2.2 0.1
0.3 1.9 0.3
0.1 0.8
0.0 0.0
0.0
0.1
0.8 2.1 2.8 0.2
0.3 1.7 0.5
0.1 0.9
0.0 S1 2.5 0.0
0.0
0.0
0.7 1.9 3.0 0.0
0.3 1.4 0.5 1 06/23/2026 PLANNING BOARD COMMENTS
0.1 0.8
0.0 2.0 0.0
0.0 0.0 NO: DATE: DESCRIPTION:
0.1
0.7 1.6 2.2 0.1 Revisions
0.3 1.2 0.2
0.1 0.4
0.0 0.7 1.2 0.0
0.0 0.0
B:\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Electrical\E100 SITE PLAN.dwg
0.0 0.0
0.0 1.4 0.1 PROJECT NUMBER:
0.0 0.3 1.0 1.3 0.1
0.0
0.1 0.2 2241067
0.0 0.0
0.0 0.0
0.0 0.0
0.8 0.4 0.0 DRAWN BY:
0.0 0.3 0.6 0.9 1.0 0.1
0.0 0.1 EMM
KBB
/ JBB
0.0 0.0
0.0 0.0
0.0 0.0 REVIEWED BY:
0.0 0.1 0.0 SRVCCL
/ DPB
0.0 0.1 0.0
0.0 0.0 0.0
0.0 0.1
0.0 0.0 0.2 ISSUED FOR:
0.0 0.0 0.3
0.0 0.0 0.4 0.0 SITE PLAN APPROVAL
0.0 0.4 0.0
0.0 0.3 0.0
0.2 0.0
0.0 0.1
0.0 0.0 0.1 DATE:
0.0 0.2
0.0 0.2
0.0
0.0 0.0 0.2 4/20/2026
0.0 0.0 0.2
0.0 0.0 0.1
0.0 0.1
0.0 0.0 DRAWING NAME:
0.0 0.0
0.0 0.0 0.1
0.0 0.0 0.1
0.0 0.0 0.1
0.0 0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0 SITE PHOTOMETRIC PLAN
0.0
0.0
0.0
0.0
0.0
0.0
DRAWING NUMBER:
6/23/2026 1:57:28 PM
N
1 SITE PHOTOMETRIC PLAN
E052 SCALE: 1" = 20'
E052
Page 692 of 1493
Page 693
June 23, 2026
Jeffery Schieber
Code Enforcement Officer
1250 Union Road – Room 210
West Seneca, New York 14224
RE: 2544 Clinton Street – Home Leasing – West Seneca Apartments
Planning Board Submission – Additional Items for Review
Mr. Schieber:
On behalf of Home Leasing, we offer the following supplemental information and drawings
based on the feedback we received from meeting with at the June 11th Planning Board
meeting, and outstanding engineering comments (from the engineering comments from
CPL dated 5/8/2026).
Supplemental Drawings:
1. Landscaping Plans (sheets L401 – L403) per the Town of West Seneca Code are
provided for Planning Board review.
2. Site Photometric Plans (sheets E051 and E052) per the Town of West Seneca Code
are provided for Planning Board review. All proposed lights are downward facing,
night sky compliant with shielding (if needed).
3. Profile Views for Sanitary and Stormwater (sheets C303 and C304) per the Town of
West Seneca Code. Sketches SK-01-C305 and SK-02-C306 are also provided to
show each utility run and stationing correlating with the profile views.
Supplemental Data:
4. Pipe Sizing Calculation Sheets – calculation sheets for storm pipe sizing throughout
the site. Pipe sizes have been revised (as needed) to match the calculations for
conveyance of the 10-year storm event. Revised pipe sizes are shown the utility
plans on C305 and C306.
5. Pipe Sizing Drainage Map – Map correlating the site plan to the pipe runs in the
spreadsheets.
Attached with this submission are the following additional drawings to be added into the
set.
L401 – Planting Plan – Overall
L402 – Planting Plan -Enlargement 1
L403 – Planting Plan – Enlargement 2
E051 – Site Photometric Plan
Page 693 of 1493
Page 694
E052 – Site Photometric Plan
C303 – Storm Profiles
C304 – Storm Profiles
C305 – Utility Profile Legend
C306 - Utility Profile Legend
We look forward to presenting this project to the Planning Board on July 9th, 2026. If you
have any questions or need any additional information, please feel free to contact me at
585-770-2525 or [email protected].
Respectfully submitted,
LaBella Associates
Shelby Vakiener
Civil Engineer
2
Page 694 of 1493
Page 695
R S
6/23/2026 4:38:27 PM
NOIM=5 AN M
AC 94.9 H
CE 2
SS
N00° 32' 17"E 174.62'
S
KEYNOTE SCHEDULE
BO
S4
NO. Keynote Description
3°
TTO
42
'1
M
7"
1 TRANSFORMER PAD
E
OF
17
260 E Main St Suite 4000 Rochester, NY 14604
8.
B 2 GENERATOR
00
AN
'
585 232 8300 | [email protected]
K 3 EXISTING FENCE
SWBR NYS Certificate of
4 TRANSFORMER PAD Authorization #: 021723
5 STONE PIER TO MATCH FRONT WALL
BO 6 COLLAPSIBLE BOLLARDS FOR FIRE LANE ACCESS
FRA SUM
TTO
M 7 PLAYGROUND / COURTYARD
3 OF 8 STONE SEATWALL TO BE SIMILAR TO FRONT WALL
BAN
K 9 LIMITS OF ARCHAEOLOGICAL BUFFER AREA
CE
NT 10 EXISTING LAWN AREA WITH EXISTING TOPOGRAPHY
ER
48"
RC
P
L 11
BA INE 12
HAMMERHEAD TURNAROUND
S5 NK OF OUTDOOR SEATING
9°
29
'1
3"E 13 CONCRETE SEATING AREA
11
7.8
5' 14 PLAYGROUND / COURTYARD
TOP
OF
BAN
K
'
.72
SYR RET
139
MAL FLO
2
"E
2
' 38
° 31
P
CEL OCC
RC
N22
"
48
1
FRA MAS
1
7
R
NOIM=6 SAN
AC 02.5 MH
CE 1
SS
S
2
3
' 8
2.9
18
E "
10
2 7'
6°
N3
1
FRA MAS
2
CO GLE SKY
5 4
CO
FRA MAS
1 CEL OCC
4 FRA MAS
5
NK
BA E EK
OF CR 18
'
CEL OCC
GA
P
OM
7.
RC
11
YU
"
T
48
1
OT
"E
CA
7
'3
B
0
°5
45
N
NK NK
BA B A
OF OF
D
OM
S
T P
BO
T TO ACE RBR D
S
7039
1
600.16
LIGND
G
.41'
97
2"E
'5 PO
16 RC
H
8°
N5
CEL OCC ACE RBR
2
F
1
PLANT SCHEDULE
O
BA LINE
TIL GSP
SYMBOL QTY BOTANICAL NAME COMMON NAME REMARKS
NK
2
R
TE
TIL GSP Deciduous Trees
FILE PATH: Autodesk Docs://26054.00 Pennrose West Seneca Apartments/Pennrose West Seneca Apartments LA_R25.rvt
3
CEL OCC FRA SUM ACE RBR 10 Acer rubrum Red Maple
2 2
N18° 32' 09"E
49.86'
OR
IG
NO INAL
R ACE RBR
ACE SUG 1 Acer saccharum Sugar Maple
OF THER
WV
CL WAY LY R
INT
ON LINE
STR OF
EET
IGH
T 1 CEL OCC 9 Celtis occidentalis Common Hackberry
FRA SUM FRA MAS 9 Fraxinus pennsylvanica `Marshall`s Seedless` Marshall`s Seedless Green Ash
WV ACE RBR 2
2 FRA SUM 10 Fraxinus pennsylvanica `Summit` Summit Green Ash
ACE RBR
GLE SKY 5 Gleditsia triacanthos inermis `Skyline` Skyline Honey Locust
N69
° 30
' 45
"W
2
MAL FLO 2 Malus floribunda Flowering Crabapple
Drawn By: RC/DK
NYS
EG
494
SYR RET 2 Syringa reticulata Japanese Tree Lilac Checked By: ES
303
.36'
NO
# TIL GSP 5 Tilia cordata `Greenspire` Greenspire Littleleaf Linden Project Manager:
0"W
'5
45
These documents and all the ideas, arrangements,
9°
Evergreen Shrubs designs and plans indicated thereon or presented
S2
thereby are owned by and remain the property of
FRA SUM SWBR and no part thereof shall be utilized by any
3
BUX WME 49 Buxus x `Gold Gem` Gold Gem Boxwood person, firm, or corporation for any purpose
whatsoever except with the specific written
JUN SK2 30 Juniperus scopulorum `Skyrocket` Skyrocket Juniper permission of SWBR. All rights reserved. ©
Revisions
1-1/4"
ON
E
GAR STO
AGE RY Shrubs
FF= FRAM
PIPE
ABE DIS 113 Abeliophyllum distichum White Forsythia
WV 601 E
.19
'
494
/3 14 N6
S60° 14' 10"E
88.00' COR GR2 59 Cornus racemosa Gray Dogwood
8
0°
1 4'
10"W COR SI6 5 Cornus alba `Siberian Pearls` Siberian Pearls Tatarian Dogwood
3'
20.
DIE LON 37 Diervilla lonicera Bush Honeysuckle
WO
CLI
O D
22. GAZ
E
N
5' BO
(WID TON S HAM XIN 69 Hamamelis x `Rochester` Rochester Witch Hazel
0'
1.0
TR
AP
TH PR
VIB DEN 35 Viburnum dentatum `Arrowwood` Arrowwood Viburnum
VAR EET
13
OX
IMA
TE
L OC
IES)
AT #2
VIB L2 39 Viburnum lentago Nannyberry
ION 561
12"
PV
0'
CW 16.
Project Name
1.0
AT 5'
ER
13
MA
IN
'
9.7
25 4.0
SWBR Project Number 26054.00
7.6 '
2'
TW
6'
FRA O ST
'
6.6
46.
M OR
APPR
OXIM FFE E HOU 2Y.0'
ATE 605 SE
LOC
ATIO .33'
N 4
" GA
S M
AP
PR
G
Owner
4'
AIN NYS OX
30.
EG
40 IMA 22.
TE 5'
0"W
L OC
AT
'5
ION
45
6" C
AS
9°
T IR
S2
ON
WA
TE
RM
L-401
AIN
10485
603.38
MB N60° 14' 10"W
MB
88.00'
APP
RO
PLANTING PLAN -
XIM
ATE
LOC
ATIO
N
OVERALL
2"
GAS
MA
IN
N
0 40' 80' 120'
OVERALL PLANTING PlAN 2026-06-23
1 1" = 40'-0" PLANNING BOARD
SCALE: 1" = 40'
ISSUANCE
Page 695 of 1493
Page 696
CO
CO
6/23/2026 4:38:29 PM
PLANT SCHEDULE PLANT SCHEDULE
SYMBOL QTY BOTANICAL NAME COMMON NAME REMARKS SYMBOL QTY BOTANICAL NAME COMMON NAME REMARKS
Deciduous Trees Evergreen Shrubs
ACE RBR 10 Acer rubrum Red Maple BUX WME 49 Buxus x `Gold Gem` Gold Gem Boxwood 260 E Main St Suite 4000 Rochester, NY 14604
585 232 8300 | [email protected]
ACE SUG 1 Acer saccharum Sugar Maple JUN SK2 30 Juniperus scopulorum `Skyrocket` Skyrocket Juniper
CEL OCC NK9 Celtis occidentalis Common Hackberry
SWBR NYS Certificate of
BA
Authorization #: 021723
FRA MAS 9
E K
Fraxinus pennsylvanica `Marshall`s Seedless` Marshall`s Seedless Green Ash Shrubs
E
OF
FRA SUM 10
CR
Fraxinus pennsylvanica `Summit` Summit Green Ash
8'
ABE DIS 113 Abeliophyllum distichum White Forsythia
P
OM
GLE SKY 5
A
Gleditsia triacanthos inermis `Skyline` Skyline Honey Locust 17.1 COR GR2 59 Cornus racemosa Gray Dogwood
RC
G 1
"
T U
48
MAL FLO 2 Malus floribunda Flowering Crabapple"E COR SI6 5 Cornus alba `Siberian Pearls` Siberian Pearls Tatarian Dogwood
OT SYR RET 2 AY Syringa reticulata Japanese Tree Lilac 37 DIE LON 37 Diervilla lonicera Bush Honeysuckle
B TIL GSP 5C Tilia cordata `Greenspire` N
45
° 5
Greenspire Littleleaf
0'
Linden HAM XIN 69 Hamamelis x `Rochester` Rochester Witch Hazel
21
VIB DEN 35 Viburnum dentatum `Arrowwood` Arrowwood Viburnum B/2 STOR
NK K RIC Y FR
A N VIB L2 39 Viburnum lentago Nannyberry KH AM
#2 OUS E &
B B A FFE 544
602
E
OF
.53'
OF
D
S
OM P
T T T O
B O D
S
7039
600.16
LIGND
G
.4 1'
97
"E
' 52 PO
° 16 RC
H
N 58
N18° 32' 09"E
49.86' OR
I
NO GINAL
R
OF THER
CL WAY LY R
INT
ON LINE IGHT
WV STR OF
EET
WV
N69
° 30'
45"
W
NYS
E G
494
NO
303 #
.36'
0"W
'5
45
9°
FILE PATH: Autodesk Docs://26054.00 Pennrose West Seneca Apartments/Pennrose West Seneca Apartments LA_R25.rvt
S2
Drawn By: RC / DK
ON Checked By: ES
E
1-1/4" GAR STO
AGE RY Project Manager:
FF= FRAM
WV PIPE 60TheseE
1.1 documents and all the ideas, arrangements,
9' and plans indicated thereon or presented
designs
thereby are owned by and remain the property of
SWBR and no part thereof shall be utilized by any
person, firm, or corporation for any purpose
S60°
whatsoever except with 14' 10"E
the specific written
permission of SWBR. All rights reserved. ©
494
88.00'
/3
8 N6
0°
14 Revisions
'1
0"W
3'
20.
KEYNOTE SCHEDULE WO
CLI
OD
22. GAZ
EB
NTO
5'
NO. Keynote Description O
1 TRANSFORMER PAD
(WID N S
0'
2 GENERATOR
1.0
AP
3 EXISTING FENCE
TH TRE PR
O
13
XIM
VAR ET
4 TRANSFORMER PAD AT
E LO
5 STONE PIER TO MATCH FRONT WALL CA
IES)
6 COLLAPSIBLE BOLLARDS FOR FIRE LANE ACCESS TIO #2
561
N1
2" P Project Name
7 PLAYGROUND / COURTYARD VC
0'
W 16. SWBR Project Number 26054.00
1.0
8 STONE SEATWALL TO BE SIMILAR TO FRONT WALL AT 5'
ER
13
9 LIMITS OF ARCHAEOLOGICAL BUFFER AREA MA
IN
'
9.7
10 EXISTING LAWN AREA WITH EXISTING TOPOGRAPHY
11 HAMMERHEAD TURNAROUND 25 4.0 Owner
12 OUTDOOR SEATING 7.6 '
2'
13 CONCRETE SEATING AREA TW
6'
FRA O ST
'
6.6
46.
14 PLAYGROUND / COURTYARD M O
APPR FFE E HOU R2Y.0'
L-402
OXIM 605 SE
ATE .33'
LOC
ATIO
N 4 AP
" GA PR
S M
G
4'
AIN NYS OX
30.
EG IM AT 22.
40 5'
E
0"W
LO
CA
TIO PLANTING PLAN
'5
N6
45
"C
AS
T IR ENLARGEMENT 1
9°
ON
S2
WA
TE
RM
N
AIN 0 20' 40' 60'
2026-06-23
SITE PLAN ENLARGEMENT - ENTRANCE AND DRIVEWAY / PARKING
1 1" = 20'-0" SCALE: 1" = 20'
PLANNING BOARD
ISSUANCE
Page 696 of 1493
10485
Page 697
BO
3°
TTO
N00
42
'1
M
7"
E
OF
17
6/23/2026 4:38:35 PM
8.
BA
00
NK
'
PLANT SCHEDULE PLANT SCHEDULE
SYMBOL QTY BOTANICAL NAME COMMON NAME REMARKS SYMBOL QTY BOTANICAL NAME COMMON NAME REMARKS
260 E Main St Suite 4000 Rochester, NY 14604
Deciduous Trees Evergreen Shrubs 585 232 8300 | [email protected]
ACE RBR 10 Acer rubrum Red Maple BUX WME 49 Buxus x `Gold Gem` Gold Gem Boxwood
BO SWBR NYS Certificate of
TTO
Authorization #: 021723
ACE SUG 1 Acer saccharum Sugar Maple JUN SK2 30 Juniperus scopulorum `Skyrocket` Skyrocket Juniper
CEL OCC 9 Celtis occidentalis Common Hackberry
M
FRA MAS 9 Fraxinus pennsylvanica `Marshall`s Seedless` Marshall`s Seedless Green Ash Shrubs OF
FRA SUM 10 Fraxinus pennsylvanica `Summit` Summit Green Ash ABE DIS 113 Abeliophyllum distichum White Forsythia B AN
GLE SKY
MAL FLO
5
2
Gleditsia triacanthos inermis `Skyline`
Malus floribunda
Skyline Honey Locust
Flowering Crabapple
COR GR2
COR SI6
59
5
Cornus racemosa
Cornus alba `Siberian Pearls`
Gray Dogwood
Siberian Pearls Tatarian Dogwood
K
SYR RET 2 Syringa reticulata Japanese Tree Lilac DIE LON 37 Diervilla lonicera Bush Honeysuckle
TIL GSP 5 Tilia cordata `Greenspire` Greenspire Littleleaf Linden HAM XIN 69 Hamamelis x `Rochester` Rochester Witch Hazel 48"
RC
P
VIB DEN 35 Viburnum dentatum `Arrowwood` Arrowwood Viburnum
VIB L2 39 Viburnum lentago Nannyberry S5
9°
29
'1
3"E
11
7.8
5'
TOP
OF
COR GR2
B ANK
VIB DEN
'
.72
3
1
139 COR GR2 VIB L2 3
3
"E
VIB DEN VIB DEN
' 38
2 1
° 31
P
COR GR2
RC
5
N22
"
48
COR GR2
9
ABE DIS
5
VIB DEN HAM XIN
3 4
ABE DIS
VIB L2 5 4
VIB DEN
1
COR GR2
5 COR GR2 BUX WME
3 6
JUN SK2 VIB DEN
3 VIB L2 6 3
DIE LON DIE LON VIB DEN ABE DIS
2 4 1 6
HAM XIN
3 HAM XIN
1
VIB L2 2 ABE DIS
ABE DIS 3
JUN SK2
5 2 HAM XIN
HAM XIN 4
3
JUN SK2
4 HAM XIN
ABE DIS 3
2 BUX WME
VIB L2 6 3
ABE DIS HAM XIN
'
.98
9 3
2
BUX WME
18
HAM XIN
3 3
FILE PATH: Autodesk Docs://26054.00 Pennrose West Seneca Apartments/Pennrose West Seneca Apartments LA_R25.rvt
"E
HAM XIN
10
JUN SK2
5
'
4
27
ABE DIS
6°
N3
2
HAM XIN ABE DIS
3 2
JUN SK2
1
VIB L2 2
ABE DIS
JUN SK2 Drawn By: RC/DK
2
2
JUN SK2 Checked By: ES
BUX WME
1 HAM XIN
CO ABE DIS
4
5 Project Manager:
ABE DIS
2 VIB DEN
2 These documents and all the ideas, arrangements,
1 designs and plans indicated thereon or presented
VIB L2 1 HAM XIN thereby are owned by and remain the property of
CO ABE DIS 6
SWBR and no part thereof shall be utilized by any
person, firm, or corporation for any purpose
whatsoever except with the specific written
2 ABE DIS permission of SWBR. All rights reserved. ©
19
Revisions
P
RC
Project Name
SWBR Project Number 26054.00
Owner
L-403
D
S
PLANTING PLAN
D
S
7039
600.16
ENLARGEMENT 2
LIGND
FF
FF 600 E
602 E .70'
N
G
.53'
SITE PLAN ENLARGEMENT - PLAYGROUND / COURTYARD / PARKING LOT 1 0 20' 40' 60'
2026-06-23
1 1" = 20'-0" PLANNING BOARD
PO
RC
H SCALE: 1" = 20' ISSUANCE
Page 697 of 1493
Page 698
ENGINEERING.ARCHITECTURE.ENVIRONMENTAL.PLANNING
300 State Street, Suite 201 ● Rochester, NY 14614
Phone 585.454.6110 ● Fax 585.454.3066
www.labellapc.com
Project: West Seneca Apartments
Project No.: 2241067
Subject Pipe Sizing Calculations
Calc By: JB
Date: 6/15/2026
Catchment # Total (Acre) Weighted Value
Pervious (SF) Impervious (SF)
COLUMN C COLUMN D COLUMN E
1 ST-3.4 816.00 8,177.00 0.21 0.84
2 ST-3.3 300.00 4,946.00 0.12 0.86
3 ST-3.2 3,905.00 12,827.00 0.38 0.74
4.1 CHAM 0.00 7,189.00 0.17 0.90
5 ST-3.1 1,198.00 17,386.00 0.43 0.85
6 ST-2.1 760.00 15,654.00 0.38 0.87
7 ST-2.2 548.00 6,725.00 0.17 0.85
8 ST-6.1 41,805.00 0.00 0.96 0.20
4.2 ST-3.0 0.00 7,189.00 0.17 0.90
4.3 ST-3.3 0.00 4,388.00 0.10 0.90
4.4 ST-3.4 0.00 6,627.00 0.15 0.90
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
Totals for System
48516 SF 82931 SF
Catchment 3.02 Acres
1.11 Acres 1.9 Acres
Page 698 of 1493
Page 699
ENGINEERING.ARCHITECTURE.ENVIRONMENTAL.PLANNING Job # 2241067
300 State Street, Suite 201 ● Rochester, NY 14614 Project: West Seneca Apartments
Phone 585.454.6110 ● Fax 585.454.3066 Date: 6/15/2026
www.labellapc.com By: JB
Location: West Seneca, NY
Design Storm Event: 10-Year
Roughness Coefficient, N = 0.013
Storm Sewer Sizing Calculations, Run 01
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
ST-3.4 ST-3.3 1 ST-3.4 0.21 0.84 0.17 0.31 6.00 12.19 3.77 18 150 0.90% 0.67 5.7 0.44 1.50 1.767 4.712 0.375 9.99 PASS
ST-3.3 ST-3.2 2 ST-3.3 0.12 0.86 0.10 0.50 10.00 9.52 4.80 18 102 0.90% 0.85 5.7 0.30 1.50 1.767 4.712 0.375 9.99 PASS
ST-3.2 ST-3.1 3 ST-3.2 0.38 0.74 0.28 0.79 10.30 9.37 7.38 18 85 2.00% 0.88 8.4 0.17 1.50 1.767 4.712 0.375 14.90 PASS
ST-3.1 ST-3.0 5 ST-3.1 0.43 0.85 0.36 1.15 10.47 9.30 10.70 18 35 1.30% 1.58 6.8 0.09 1.50 1.767 4.712 0.375 12.01 PASS
#N/A #N/A #N/A #N/A 10.55 9.26 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 1.15 Ac
Next Tc = 10.55 Min.
Storm Sewer Sizing Calculations, Run 02
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
ST-2.2 ST-2.1 7 ST-2.2 0.17 0.85 0.14 0.14 5.00 13.19 1.87 12 50 2.00% 0.29 6.4 0.13 1.00 0.785 3.142 0.250 5.05 PASS
ST-2.1 CHAM 6 ST-2.1 0.38 0.87 0.33 0.47 5.13 13.05 6.11 18 30 1.83% 0.76 8.1 0.06 1.50 1.767 4.712 0.375 14.25 PASS
#N/A #N/A #N/A #N/A 5.19 12.98 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.47 Ac
Next Tc = 5.19 Min.
Storm Sewer Sizing Calculations, Run 03
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
BLDG CHAM 4.1 CHAM 0.17 0.90 0.15 0.15 5.00 13.19 1.96 10 206 1.25% 0.43 4.5 0.76 0.83 0.545 2.618 0.208 2.46 PASS
#N/A #N/A #N/A #N/A 5.76 12.41 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.15 Ac
Next Tc = 5.76 Min.
Page 699 of 1493
Page 700
Storm Sewer Sizing Calculations, Run 04
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
SWALE ST-6.1 8 ST-6.1 0.96 0.20 0.19 0.19 30.00 5.05 0.97 12 177 1.00% 0.21 4.5 0.65 1.00 0.785 3.142 0.250 3.57 PASS
#N/A #N/A #N/A #N/A 30.65 4.98 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.19 Ac
Next Tc = 30.65 Min.
Storm Sewer Sizing Calculations, Run 05
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
AREA 4.2 ST-3.0 4.2 ST-3.0 0.17 0.90 0.15 0.17 5.00 13.19 2.18 10 209 1.00% 0.54 4.0 0.86 0.83 0.545 2.618 0.208 2.20 PASS
#N/A #N/A #N/A #N/A 5.86 12.31 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.17 Ac
Next Tc = 5.86 Min.
Storm Sewer Sizing Calculations, Run 06
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
AREA 4.3 AREA 2 4.3 ST-3.3 0.10 0.90 0.09 0.09 5.00 13.19 1.20 10 26 3.38% 0.16 7.4 0.06 0.83 0.545 2.618 0.208 4.04 PASS
#N/A #N/A #N/A #N/A 5.06 13.12 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.09 Ac
Next Tc = 5.06 Min.
Page 700 of 1493
Page 701
Storm Sewer Sizing Calculations, Run 07
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
AREA 4.4 AREA 3.4 4.4 ST-3.4 0.15 0.90 0.14 0.14 5.00 13.19 1.81 10 26 1.00% 0.45 4.0 0.11 0.83 0.545 2.618 0.208 2.20 PASS
#N/A #N/A #N/A #N/A 5.11 13.07 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.14 Ac
Next Tc = 5.11 Min.
Page 701 of 1493
Page 702
' 39
169.
S43
° 42
' 17"
E 1
41"E
78.0
593.19
0'
° 55'
S59° 29' 13"E 117.85'
N45
600.14
ST
ST
602.49
602.51
594.95
594.92
C0
UD ST UD UD UD
ST UD C
600
60
0
N0
0°
C
NEW PRIVATE
FIRE HYDRANT
32
'1
7"E
FS
ST
17
4.6
600
AREA 4.4
2'
AREA 1
C0
FS
600
NEW 6" FIRE SERVICE
600
(AFTER BACKFLOW
PREVENTOR)
ST-3.4
ST
PROPOSED
PLAYGROUND ST-3.4
FS
ST
AREA 4.3
NEW BACKFLOW PREVENTOR (IN
FS
ST
MECHANICAL ROOM) FOR COMBINED
AREA 4.2
SERVICE. DOMESTIC SERVICE WILL BE
AREA 4.1 PROPOSED
3-STORY
METERED AFTER THE BACKFLOW.
ST-3.3 AREA 2
C0
N22° 31'
CHAM BUILDING
± 25,000 SF FOOTPRINT
ST-3.0
ST-3.3C
38"E 13
C0
C0 C0
C0
ST ST ST
C0
ST
C0
ST ST ST ST
SA
600
SA
ST
9.72'
SA
ST
ST
SA S
SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA
SA
ST
AREA 7 AREA 3
ST
ST
SA
599
599
ST-2.2
600
ST-3.2
SA
ST
599 D D
599
AREA 6 AREA 5
59
SA
ST
ST
9
599
C ST C
ST-2.1 ST-3.1 C
ST ST ST C
SA
ST ST ST ST D D
599
SA
RIM=599.00 599 NEW 6" COMBINED
8'
WATER SERVICE
NEW PRIVATE
0"E 182.9
FIRE HYDRANT
SA
600
FS
NEW 6" FIRE SERVICE 600
N36° 27' 1
(AFTER BACKFLOW
598
599
598
599
PREVENTOR)
599
DS
596.55
594.04
DS
NEW BACKFLOW PREVENTOR
(IN MECHANICAL ROOM) FOR
598
COMBINED SERVICE.
597
59987
DOMESTIC SERVICE WILL BE
S29° 45' 50"W
METERED AFTER THE
5
600
BACKFLOW.
C0
UD
5 9987 UD
5596.50
5 9 6 UD UD
60 UD UD
5 95966.50
18'
C
0
NEW 6" COMBINED 5 9978
5
117.
WATER SERVICE ST
ST
600
S60° 14' 10"E
37"E
ST
ST 598
88.00'
° 50'
59
9 59796
D
ST 599.84
ST 5 6
ST
AREA 8 59978
15.7'
N45
ST
ST 59
ST
ST
5
598
ST
ST 598 NEW 6" COMBINED
131.00'
WATER SERVICE
C0
UD UD UD
596
595
UD UD UD
C
ST-6.1
595
131.00'
C
598.87 9
59
'
.41
595.50
S29° 45' 50"W
596
97
598
598
597
596
595
595
59 6
5987
59
T
2"E
ST ST ST ST ST ST D
ST ST ST ST ST ST C
'5
16
598
8°
N5
N60° 14' 10"W
N60° 14' 10"W 257.62' 88.00'
N18° 32' 09"E 303.36'
CONNECT TO EXISTING 6"
49.86' ' 45"W
WATERMAIN WITH TS&V
N69° 30
N
WEST SENECA APARTMENTS DATE: 06/23/2026
SITE PIPE SIZING CONTRIBUTING AREAS SCALE: 1"=40'
Page 702 of 1493
Page 703
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
620 620
labellapc.com
620 620
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
610 610 610 610
610 610
ST-4.0 24"x24"
RIM=598.00
NE INV=594.58 ST-6.0 4' DIA. ST-5.2 24"x24" ST-5.0 4' DIA.
NW INV=594.58 NEW 6" COMBINED RIM=598.30 RIM=596.01 RIM=598.95
PROPOSED
WATER SERVICE NW INV=590.00 W INV=592.58 PROPOSED NW INV=591.20
GRADE
600 600 600 SE INV=590.10 600 E INV=592.58 GRADE E INV=591.92
EXISITNG EXP: EXP:
EXISITNG 600 S INV=591.30 600
GRADE
NEW GAS MAIN (REFER TO GRADE
± 75LF 12" SICPP
@ 1.43% MECHANICAL DRAWINGS) NEW 6" COMBINED
CERTIFICATE OF AUTHORIZATION NUMBER:
WATER SERVICE PROFESSIONAL ENGINEERING: 0021272
END SECTION ± 179LF 12" SICPP @ 0.9 LAND SURVEYING: 0021271
8% ± 134LF 12" SICPP @ 0.49%
INV=593.50 GEOLOGICAL: 0021659
590 590 ± 169LF 12" SICP
590 P @ 1.48% 590 ± 217LF 12" SICPP @ 1.0
1%
ST-6.1 24"x24"
RIM=594.35
590 590
NW INV=591.85 END SECTION It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
END SECTION Sec. 7307, for any person, unless acting under the direction of a licensed
INV=587.50
INV=589.00 architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
580 580 580 580 the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
580 580
© 2026
2024 LaBella Associates
570 570 570 570
570 570
HOME LEASING
599.08
599.08
598.73
598.73
588.29
588.29
599.39
599.39
599.48
599.48
598.74
598.74
598.18
598.18
598.40
598.40
597.24
597.24
594.08
594.08
592.69
592.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
593.61
593.61
597.45
597.45
596.94
596.94
598.80
598.80
599.27
599.27
598.76
598.76
598.33
598.33
595.40
595.40
585.47
585.47
75 S CLINTON AVE SUITE 700,
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ROCHESTER, NEW YORK 14604
0+00 0+50 0+95.42 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 3+77.01
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 3+70.49
5 E STORM 4 D STORM 3 C STORM
C303 SCALE: H: 1" = 40' V: 1"=8' C303 SCALE: H: 1" = 40' V: 1"=8' C303 SCALE: H: 1" = 40' V: 1"=8'
620 620
WEST SENECA APARTMENTS
610 610 2544 CLINTON ST,
WEST SENECA, NY 14224
ST-3.0 4' DIA. ST-1.0
ST-3.3 24"x24" ST-3.1 24"x24" RIM=599.33
610 610 ST-3.4 24"x24" ST-3.2 24"x24"
RIM=598.89
ST-1.1 4' DIA. ADS BARRACUDA MAX S6 WQU
RIM=599.62 RIM=599.74 RIM=598.47 PROPOSED NW INV=593.00 RIM=599.04 RIM=599.00
EXISITNG N INV=593.46
ST-2.2 24"x24" ST-2.0 4' DIA. SW INV=597.32 ± 82LF 18" SICPP @ 0.89% SW INV=595.86 NW INV=594.90 GRADE S INV=593.10 NW INV=590.30 E INV=590.20
NE INV=595.96
GRADE SE INV=593.56 NE INV=593.20
RIM=598.62 RIM=599.29 NE INV=595.00 SE INV=590.40 W INV=590.20
SE INV=594.77 SE INV=593.10 600 600
W INV=593.20
ST-2.1 24"x24" ± 104LF 18" SICPP @ 0.82% 4" SANITARY SEWER
RIM=598.87 ± 86LF 18" SICP
P @ 1.56% CROSSING
600 E INV=593.40 600 ± 44LF 18" SICPP @ 0.89% TOP OF PIPE EL:595.88
NW INV=593.50 ± 27LF 18" SICPP @ 0.89%
1 06/23/2026 PLANNING BOARD COMMENTS
18" MIN.
NEW 6" COMBINED ± 122LF 12" SICPP @ 0.37% NO: DATE: DESCRIPTION:
± 36LF 18" SICPP @ 1.00%
590 590
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
WATER SERVICE Revisions
± 5LF 18" SICPP @ 2.02% ADS STORMTECH CHAMBER ± 9LF 12" SICPP @ 1.15%
± 51LF 12" SICPP @ 2.48% END SECTION
SYSTEM SC-3500 ± 5LF 12" SICPP @ 2.01% INV=589.75
4" SANITARY SEWER (120 CHAMBERS) PROJECT NUMBER:
590 CROSSING 590 STONE INV=590.50 2241067
TOP OF PIPE EL:595.73 CHAMBER
± 31LF 18" SICPP @ 0.65% ELEVATION=591.25 DRAWN BY:
EMM / JBB
ADS STORMTECH CHAMBER 580 580
REVIEWED BY:
SYSTEM SC-3500 SRV / DPB
(120 CHAMBERS)
STONE INV=590.50 ISSUED FOR:
580 580 SITE PLAN APPROVAL
CHAMBER ELEVATION=591.25
594.39
594.39
596.20
596.20
598.66
598.66
598.68
598.68
DATE:
0.00
0.00
0.00
0.00
570 570 4/20/2026
DRAWING NAME:
599.61
599.61
599.77
599.77
599.78
599.78
599.58
599.58
599.89
599.89
599.93
599.93
599.90
599.90
599.98
599.98
599.03
599.03
598.27
598.27
594.54
594.54
587.19
587.19
600.27
600.27
600.04
600.04
595.06
595.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0+00 0+50 1+00 1+05.60
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 6+89.48
STORM PROFILES
2 B STORM 1 A STORM
C303 SCALE: H: 1" = 40' V: 1"=8' C303 SCALE: H: 1" = 40' V: 1"=8'
DRAWING NUMBER:
6/23/2026 1:47:37 PM
C303
Page 703 of 1493
Page 704
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2026
2024 LaBella Associates
620 620
PROPOSED BUILDING
HOME LEASING
620 620 75 S CLINTON AVE SUITE 700,
610 610 ROCHESTER, NEW YORK 14604
CONNECTION TO EXISTING
48" SANITARY SEWER AT
±INV=585.70
EXISTING BUILDING APPROXIMATE BASED ON
PROPOSED FFE=600.75 EXISITNG PROPOSED RECORD MAPPING
610 610 GRADE GRADE
600 600
EXISTING FFE=600.70 SAN 1.0 4' DIA.
RIM=599.80 ±242' 6" PVC SDR-21 @ 1.00%
PROPOSED
NW INV=592.69
GRADE
SE INV=592.72 ±25' 6" PVC SDR-21 @ 1.00%
EXISITNG S INV=593.99
GRADE
600 600 BUILDING 10" STORM 10" STORM
590 INV=595.75 SEWER CROSSING SEWER CROSSING 590
±123' 4" PVC TOP OF PIPE EL:594.48 TOP OF PIPE EL:593.28
SDR-21 @ 2.
00%
SAN 1.0 4' DIA.
RIM=599.80
±12' 4" PVC SDR-21 @ 2.00% INTERIOR DROP NW INV=587.00
BUILDING SE INV=592.72
590 18" STORM 590
INV=596.70 S INV=593.99
SEWER CROSSING 580 580
TOP OF PIPE EL:594.88 ±45' 6" PVC SDR-21 @ 2.88%
12" STORM
SEWER CROSSING EXISTING 48" SANITARY SEWER
WEST SENECA APARTMENTS
TOP OF PIPE EL:591.17 2544 CLINTON ST,
WEST SENECA, NY 14224
580 580
570 570
598.65
598.65
598.25
598.25
596.10
596.10
594.48
594.48
594.44
594.44
0.00
0.00
0.00
0.00
0.00
599.61
599.61
598.11
598.11
594.81
594.81
594.51
594.51
598.79
598.79
594.55
594.55
599.30
599.30
599.50
599.50
599.20
599.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0+00 0+50 1+00 1+50 1+55.70
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 3+68.23
1 06/23/2026 PLANNING BOARD COMMENTS
NO: DATE: DESCRIPTION:
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
1 B SANITARY 1 A SANITARY Revisions
C304 SCALE: H: 1" = 40' V: 1"=8' C304 SCALE: H: 1" = 40' V: 1"=8'
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / JBB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
SANITARY PROFILES
DRAWING NUMBER:
6/23/2026 1:47:39 PM
C304
Page 704 of 1493
Page 705
NOT FOR CONSTRUCTION
ST
599
ST
MATCH TO INSET
E STORM 0+95
300 Pearl Street, Suite 130
598
ST
Buffalo, NY 14202
RIPRAP OUTLET 716-551-6281
CONTROL (TYP.) ST-4.0
599 24"X24" CB labellapc.com
ST
END SECTION 600 RIM=598.00
INV= 593.50 600
599
598
600
ST
C0
UD UD
ST UD UD ST UD UD UD
ST UD UD ST UD UD C
NEW 2' WIDE
E STORM 0+00
GRAVEL DIAPHRAGM
600.14
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
ST
NEW BIORETENTION
± 75LF 12" SICPP @ 1.43%
599
AREA #1 (± 375 SF)
600
ST
ST
EXP: EXP:
N
A STORM 0+00
CERTIFICATE OF AUTHORIZATION NUMBER:
2 INSET 60
0 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
C305 SCALE: 1"=20' GEOLOGICAL: 0021659
C
NEW PRIVATE
FIRE HYDRANT
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
FS
Sec. 7307, for any person, unless acting under the direction of a licensed
ST
ST-3.4
24"X24" CB architect, professional engineer, or land surveyor, to alter an item in any
PROFILE LEGEND RIM=599.62 way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
ST
A STORM
FS
date of such alteration, and a specific description of the alteration.
B STORM
© 2026
2024 LaBella Associates
ST
C STORM
FS
600
C0
CLEANOUT ST
D STORM SE INV=597.26
NEW 6" FIRE SERVICE
600
G
600
(AFTER BACKFLOW
ST
E STORM PREVENTOR)
HOME LEASING
FS
PROPOSED
G
75 S CLINTON AVE SUITE 700,
A SANITARY
ROCHESTER, NEW YORK 14604
ST
PLAYGROUND
G
B SANITARY
FS
G
ST
A STORM 1+00
G
FS
ST
G
FS
ST
G
NEW BACKFLOW PREVENTOR (IN FS
MECHANICAL ROOM) FOR COMBINED
W W
G
SERVICE. DOMESTIC SERVICE WILL BE
PROPOSED
595
ST
METERED AFTER THE BACKFLOW.
W
G
3-STORY
596
CLEANOUT C0
ST
SE INV=596.51
597
BUILDING
G
W
598
ST
± 25,000 SF FOOTPRINT
G
CLEANOUT CLEANOUT BLDG INV=
BLDG INV= CLEANOUT CLEANOUT
FFE=600.75' WEST SENECA APARTMENTS
A SANITARY 0+00
NW INV=593.50 SW INV=593.90 SW INV=595.75
SW INV=595.08 SW INV=592.75 SE INV=594.38
G
NW INV=593.90
W
NW INV=592.75
99
CLEANOUT
SE INV=592.75
SE INV=593.90 C
2544 CLINTON ST,
SE5 INV=594.00 ST-3.3 WEST SENECA, NY 14224
G
C0 C0 24"X24" CB
600 C0 C0 C0 ST ST
C0 ST ST ST ST ST ST ST ST
SA
ST ST ST ST ST ST ST ST ST ST RIM=599.74
ST
1
W
60
G
SA
600
CONNECT INTO CLEANOUT
ST
B SA
SA
C0
EXISTING NW INV=594.85
NITA
ST
SANITARY MAIN
SA
SAN CO
G
SAN CO
ST
A SANIT
RY 1
ARY 3+ SA TYP.
6 8 SA TYP. C0
W
C0
SA SA
ST
+56
600
A STORM 2+00
SA
SA
G
SA S SA SA SA SA SA SA SA SA SA SA SA SA SA SA C0
SA SA SA SA SA SA SA SA SA SA SA
ST
SA SA SA SA SA SA SA SA
A SANITARY 3+00 A SANITARY 2+00 SAN CO
CLEANOUT
ST
INV=594.41 A SANITARY 1+00
SAN 1.0 4' DIA.
SA
RIM=593.62 TYP. SAN CO 1 06/23/2026 PLANNING BOARD COMMENTS
G
ST
RIM=594.70 C0
WYE THRU NW INV=593.08 TYP.
W
NO: DATE: DESCRIPTION:
NW INV=587.00 SE INV=593.08
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
SA
ST
SE INV=592.72 Revisions
G
E INV=593.08
ST
S INV=593.99
595
SA
ST
ST-2.0
4' DIA. MH PROJECT NUMBER:
G
596
W
2241067
ST
RIM=599.29
SA
ST
597
ST-3.0
599
599
4' DIA. MH
G
DRAWN BY:
ST
B SA
600
598
RIM=599.33 EMM / JBB
SA
NITA
REVIEWED BY:
W
B STORM 1+00
ST
SRV / DPB
G
RY 1
B STORM 1+06
599
599
SA
D D
599
+
M 4+00 ISSUED FOR:
A STOR
00
ST-1.1
SITE PLAN APPROVAL
G
ST
SA
ST
59
4' DIA. MH
9
ST
W
ST-2.2 RIM=599.04
DATE:
SA
24"X24" CB ST
G
ST
599 4/20/2026
RIM=598.62
B STORM 0+00
RIPRAP OUTLET SAN CO +00
ST ST ST TORM 5
SA
C C
CONTROL (TYP.) TYP. AS C ST ST ST ST ST ST C
DRAWING NAME:
G
ST ST ST ST ST ST ST ST ST C0 D D
A STORM 3+00
W
A STORM 6+89 A STORM 6+00 ST-3.2
SA
ST-2.1 ST-3.1 24"X24" CB
END SECTION
G
24"X24" CB 24"X24" CB RIM=598.47
INV= 589.75 ST-1.0
SA
599 RIM=598.87 RIM=598.89
ADS BARRACUDA MAX S6 WQU
ADS STORMTECH CHAMBER
W
G
RIM=599.00 599 NEW 6" COMBINED
SA
NEW PRIVATE
SYSTEM SC-3500
(120 CHAMBERS)
WATER SERVICE UTILITY PROFILE LEGEND
FIRE HYDRANT
G
SA
MATCH TO SHEET: C302
W
SA
G
FS
600
G
DRAWING NUMBER:
W
SA
C0
G
600
UTILITY PLAN NOTES:
6/23/2026 3:35:31 PM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PROFILE LEGEND 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C305
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C305 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 705 of 1493
Page 706
SA
599 RIM=598.87 RIM=598.89
ADS BARRACUDA MAX S6 WQU 24
NOT FOR CONSTRUCTION
ADS STORMTECH CHAMBER
W
G
RIM=599.00 599 NEW 6" COMBINED
SA
SYSTEM SC-3500 WATER SERVICE
NEW PRIVATE
(120 CHAMBERS)
FIRE HYDRANT
G
SA
MATCH TO SHEET: C301
W
SA
G
300 Pearl Street, Suite 130
FS
600 Buffalo, NY 14202
G
716-551-6281
W
SA
PROFILE LEGEND ±12' 4" PVC SDR-21 @ 2.00% C0
G
SAN CO NEW 6" FIRE SERVICE 600 labellapc.com
B SANITARY 0+00
A STORM
FS
TYP. (AFTER BACKFLOW
G
PREVENTOR)
598
W
599
598
599
B STORM BLDG INV=
599
DS
NE INV=596.70
G
C STORM
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
W
G
D STORM
E STORM
G
W
A SANITARY
G
B SANITARY EXP: EXP:
G
W
CERTIFICATE OF AUTHORIZATION NUMBER:
G
DS PROFESSIONAL ENGINEERING: 0021272
NEW BACKFLOW PREVENTOR LAND SURVEYING: 0021271
598 G
(IN MECHANICAL ROOM) FOR GEOLOGICAL: 0021659
W
COMBINED SERVICE.
597
DOMESTIC SERVICE WILL BE
597
NEW 2' WIDE
G
598
METERED AFTER THE GRAVEL DIAPHRAGM It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
BACKFLOW. NEW BIORETENTION G Sec. 7307, for any person, unless acting under the direction of a licensed
600
W
AREA #2 (± 370 SF) C0 architect, professional engineer, or land surveyor, to alter an item in any
G
UD
way. If an item bearing the seal of an architect, engineer, or land surveyor
ST-5.2
G is altered; the altering architect, engineer, or land surveyor shall affix to
24"X24" CB 599 UD W
the item their seal and notation "altered by" followed by their signature and
RIM=596.01 598 UD G
597 UD date of such alteration, and a specific description of the alteration.
596.50 UD W G
596 UD
UD
UD UD G © 2026
2024 LaBella Associates
UD00 UD
UD 0+
60 UD M W
TOR
C
5 9 6 .50
W
0 CS G
596 7
ST 59
NEW 6" COMBINED 598 G
ST
W
WATER SERVICE
G
ST
W W W W W W W W W W W
HOME LEASING
T
W G
ST
600 G
ST 75 S CLINTON AVE SUITE 700,
ST-5.0 ST W G ROCHESTER, NEW YORK 14604
4' DIA. MH ST 0
RIM=598.95 1+0 G
RM
ST C ST
O W 598
G
ST
G
W
59 597
T
D
ST 9
G
596
ST
ST
ST
ST
ST W G 6
C STORM 2+00 59 7
ST
ST
ST
ST
ST 59 8
RIPRAP OUTLET ST
ST G 59
598
ST ST-5.1
ST 598 NEW 6" COMBINED W
CONTROL (TYP.)
ST
ST C STORM 3+00 NEW 2' WIDE G
24"X24" CB WATER SERVICE
ST
GRAVEL DIAPHRAGM 596 RIM=596.10
C STORM 3+70 W
G PROPOSED SWALE
END SECTION 595 460 LF @ 1.0%
UD UD C G
UD UD UD UD BOTTOM WIDTH 1' MIN.
INV= 589.00 C0
UD UD UD UD
UD UD
G
T
UD
W
UD
UD
UD
UD
G
595 ST ES-5 ST
SE INV=585.58 W G
NEW BIORETENTION
G
C
AREA #3 (± 700 SF)
G
9
59
W
ST-5.3
G
595.50 24"X24" CB
596 RIM=598.85 WEST SENECA APARTMENTS
T
G
598
2544 CLINTON ST,
5 98
597
596
W
595
595
596
597
WEST SENECA, NY 14224
598
RIPRAP OUTLET
G
CONTROL (TYP.) ST ST ST ST ST ST ST ST ST ST ST C
ST ST ST ST ST ST ST ST ST ST ST ST D ST ST
D STORM 2+00 D STORM 1+00 D STORM 0+00
D STORM 3+68 D STORM 3+00
END SECTION
W
G
ST-6.0 ST-6.1
T
INV= 587.50
4' DIA. MH 30"X30" CB
RIM=598.30 RIM=594.35
598
G
W
G
1 06/23/2026 PLANNING BOARD COMMENTS
G
T
NO: DATE: DESCRIPTION:
W
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
Revisions
G
PROJECT NUMBER:
2241067
G
W
DRAWN BY:
EMM / JBB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
CONNECT TO EXISTING 6" SITE PLAN APPROVAL
WATERMAIN WITH TS&V
DATE:
4/20/2026
DRAWING NAME:
UTILITY PROFILE LEGEND
DRAWING NUMBER:
UTILITY PLAN NOTES:
6/23/2026 3:35:37 PM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PROFILE LEGEND 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C306
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C306 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 706 of 1493
Page 707
Short Environmental Assessment Form
Part 1 - Project Information
Instructions for Completing
Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as
thoroughly as possible based on current information.
Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the
lead agency; attach additional pages as necessary to supplement any item.
Part 1 – Project and Sponsor Information
Name of Action or Project:
Zen Nails
Project Location (describe, and attach a location map):
1976 Ridge Road - West Seneca, NY 14224
Brief Description of Proposed Action:
The property is currently owned by Tiffany Truc Phan, owner of Tiffany Zen Nails Spa of Erie LLC. The work included for this project will be the partial
demolition to an existing building to include a new addition. The project will provide a new salon with programs such as pedicure stations, manicure
stations, a bar and other aesthetic amenities. This property is located in the C-2 Zone.
Name of Applicant or Sponsor: Telephone: 716-932-7156
Michael Berger
E-Mail: [email protected]
Address:
5409 Main Street
City/PO: State: Zip Code:
Williamsiville New York 14221
1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES
administrative rule, or regulation?
If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that
✔
may be affected in the municipality and proceed to Part 2. If no, continue to question 2.
2. Does the proposed action require a permit, approval or funding from any other government Agency? NO YES
If Yes, list agency(s) name and permit or approval: Building Permit, Planning Approval, Demo Permit, ZBA Parking
Reduction ✔
3. a. Total acreage of the site of the proposed action? 0.460 acres
__________
b. Total acreage to be physically disturbed? __________
0.460 acres
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor? __________
0.460 acres
4. Check all land uses that occur on, are adjoining or near the proposed action:
5. ✔ Urban Rural (non-agriculture) Industrial ✔ Commercial Residential (suburban)
□ Forest Agriculture Aquatic Other(Specify):
□ Parkland
Page 1 of 3 SEAF 2019
Page 707 of 1493
Page 708
5. Is the proposed action, NO YES N/A
a. A permitted use under the zoning regulations?
✔
b. Consistent with the adopted comprehensive plan? ✔
NO YES
6. Is the proposed action consistent with the predominant character of the existing built or natural landscape?
✔
7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? NO YES
If Yes, identify: ________________________________________________________________________________
✔
NO YES
8. a. Will the proposed action result in a substantial increase in traffic above present levels?
✔
b. Are public transportation services available at or near the site of the proposed action?
✔
c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed
action?
✔
9. Does the proposed action meet or exceed the state energy code requirements? NO YES
If the proposed action will exceed requirements, describe design features and technologies:
Project will meet all state energy requirements
_____________________________________________________________________________________________
✔
_____________________________________________________________________________________________
10. Will the proposed action connect to an existing public/private water supply? NO YES
If No, describe method for providing potable water: _________________________________________
✔
_____________________________________________________________________________________________
11. Will the proposed action connect to existing wastewater utilities? NO YES
If No, describe method for providing wastewater treatment: ______________________________________
✔
_____________________________________________________________________________________________
12. a. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district NO YES
which is listed on the National or State Register of Historic Places, or that has been determined by the
Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the ✔
State Register of Historic Places?
✔
b. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for
archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain NO YES
wetlands or other waterbodies regulated by a federal, state or local agency?
✔
b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody?
✔
If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: _____________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
Page 2 of 3
Page 708 of 1493
Page 709
14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply:
□Shoreline □ Forest Agricultural/grasslands Early mid-successional
Wetland □ Urban
✔ Suburban
15. Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or NO YES
Federal government as threatened or endangered?
✔
16. Is the project site located in the 100-year flood plan? NO YES
✔
NO YES
17. Will the proposed action create storm water discharge, either from point or non-point sources?
If Yes, ✔
a. Will storm water discharges flow to adjacent properties? ✔
b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)? ✔
If Yes, briefly describe:
_____________________________________________________________________________________________
All Stormwater runoff will be directed to stormwater drains (Re-use existing)
_____________________________________________________________________________________________
18. Does the proposed action include construction or other activities that would result in the impoundment of water NO YES
or other liquids (e.g., retention pond, waste lagoon, dam)?
If Yes, explain the purpose and size of the impoundment:______________________________________________
✔
____________________________________________________________________________________________
_ Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste
19. NO YES
management facility?
If Yes, describe: _______________________________________________________________________________
✔
_____________________________________________________________________________________________
20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or NO YES
completed) for hazardous waste?
If Yes, describe: _______________________________________________________________________________
✔
_____________________________________________________________________________________________
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF
MY KNOWLEDGE
Applicant/sponsor/name: ____________________________________________________
Michael Berger
Date: 3/2/2021
__________________________
_____________________
Architect
Signature: _____________________________________________________Title:__________________________________
PRINT FORM Page 3 of 3
Page 709 of 1493
Page 710
Concept Rendering
NTS
82'-101 4"
22'-01 4"
Parapet Wall
Black Metal Cap
Top Of Parapet Top Of Parapet w/ Signage
(+18'-4 1/2" +/-) (+18'-4 1/2" +/-)
Black Metal Cap Black Metal Cap
Top Of Roof Top Of Roof Black Metal Cap
Framed
(+15'-10 1/2" +/-) Soffit w/ (+15'-10 1/2" +/-)
Down
4'-101 2"
4'-101 2"
Large Large Large
Lighting
Format Up/Down Format Format
Black Lighting Tile Up/Down Lighting Tile
Tile
Large Large
15'-101 2"
15'-101 2"
Format Format
Black Black
8'-10"
8'-10"
Tile Tile
W1 W1 W1 W2 W1 W1 W3 W3
2'-2"
2'-2"
102
Grade Level Grade Level
(+0'-0" +/-) Concrete Water Table (+0'-0" +/-)
Aluminum Framed Concrete Water Table Aluminum Framed Existing Grade Aluminum Framed Storefront Aluminum Existing Grade Aluminum Framed
Windows Windows Windows Framed Entrance Door Windows
South Elevation East Elevation
3/16" = 1'-0" 3/16" = 1'-0"
Parapet Wall PROPOSED EXISTING Black Metal Cap EXISTING PROPOSED
w/ Signage ADDITION BUILDING Top Of Parapet Top Of Parapet Parapet Wall Beyond BUILDING ADDITION
(+18'-4 1/2" +/-) (+18'-4 1/2" +/-)
Black Metal Cap Black Metal Cap Black Metal Cap
Top Of Roof Top Of Roof
(+15'-10 1/2" +/-) (+15'-10 1/2" +/-)
4'-101 2"
4'-101 2"
Large Large Large Large
Format Format Format Format
Tile Up/Down Lighting Tile Up/Down Lighting Tile Up/Down Lighting Tile
Large Large Large Large
15'-101 2"
15'-101 2"
Format Format Format Format
Black Black Black Black
8'-10"
8'-10"
Tile Tile Tile Tile
W3
2'-2"
2'-2"
101
EX Grade Level Grade Level
Existing Building Existing Door & (+0'-0" +/-) (+0'-0" +/-) Existing Building
Storefront Aluminum Existing Grade Aluminum Framed Existing Grade Existing Grade
Framed Entrance Door Windows To Remain Frame To Remain To Remain
West Elevation North Elevation
3/16" = 1'-0" 3/16" = 1'-0"
Proposed Elevations For:
Zen Nails
1976 Ridge Road "D
es ild
"
u
West Seneca, NY 14224
ig
2 B
n
Page 710 of 1493
Page 711
Page 711 of 1493
Page 712
Page 712 of 1493
Page 713
Page 713 of 1493
Page 714
Page 714 of 1493
148.80'
9 0°0
'0"
'
61.75'
30.10'
Existing inal
ig
ete Or
Concr uilding
30.10'
BlockNoB. 1976
61.70' ,46 Ac Site
Aerial View ed
Propos F
119.82'
S
1,698
n
Additio
8
150.0'
Parking Analysis:
Total Site Area: 20,074 sf / 0.460 Acres
Building Areas:
10 Retail Area: 3,550 sf / 0.08 Acres
Parking Calculations:
(3) Parking Spaces Per Salon Chair =
22 Chairs = 66 Parking Spaces
Total Parking Requirements: 66 Parking Spaces
Total Parking Available: 26 Parking Spaces
8 Additional Parking Needed: 40 Parking Spaces
ZBA Approved on April 22nd, 2026
Existing Photo #1 78
°32
'5 "'
'
152.81
G
Existing Photo #2 Site Plan
Proposed Site Plan For:
Zen Nails
1976 Ridge Road
West Seneca, NY 14224
Page 715
Page 715 of 1493
Page 716
Short Environmental Assessment Form
Part 1 - Project Information
Instructions for Completing
Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as
thoroughly as possible based on current information.
Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the
lead agency; attach additional pages as necessary to supplement any item.
Part 1 – Project and Sponsor Information
Name of Action or Project:
Zen Nails
Project Location (describe, and attach a location map):
1976 Ridge Road - West Seneca, NY 14224
Brief Description of Proposed Action:
The property is currently owned by Tiffany Truc Phan, owner of Tiffany Zen Nails Spa of Erie LLC. The work included for this project will be the partial
demolition to an existing building to include a new addition. The project will provide a new salon with programs such as pedicure stations, manicure
stations, a bar and other aesthetic amenities. This property is located in the C-2 Zone.
Name of Applicant or Sponsor: Telephone: 716-932-7156
Michael Berger
E-Mail: [email protected]
Address:
5409 Main Street
City/PO: State: Zip Code:
Williamsiville New York 14221
1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES
administrative rule, or regulation?
If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that
✔
may be affected in the municipality and proceed to Part 2. If no, continue to question 2.
2. Does the proposed action require a permit, approval or funding from any other government Agency? NO YES
If Yes, list agency(s) name and permit or approval: Building Permit, Planning Approval, Demo Permit, ZBA Parking
Reduction ✔
3. a. Total acreage of the site of the proposed action? 0.460 acres
__________
b. Total acreage to be physically disturbed? __________
0.460 acres
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor? __________
0.460 acres
4. Check all land uses that occur on, are adjoining or near the proposed action:
5. ✔ Urban Rural (non-agriculture) Industrial ✔ Commercial Residential (suburban)
□ Forest Agriculture Aquatic Other(Specify):
□ Parkland
Page 1 of 3 SEAF 2019
Page 716 of 1493
Page 717
5. Is the proposed action, NO YES N/A
a. A permitted use under the zoning regulations?
✔
b. Consistent with the adopted comprehensive plan? ✔
NO YES
6. Is the proposed action consistent with the predominant character of the existing built or natural landscape?
✔
7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? NO YES
If Yes, identify: ________________________________________________________________________________
✔
NO YES
8. a. Will the proposed action result in a substantial increase in traffic above present levels?
✔
b. Are public transportation services available at or near the site of the proposed action?
✔
c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed
action?
✔
9. Does the proposed action meet or exceed the state energy code requirements? NO YES
If the proposed action will exceed requirements, describe design features and technologies:
Project will meet all state energy requirements
_____________________________________________________________________________________________
✔
_____________________________________________________________________________________________
10. Will the proposed action connect to an existing public/private water supply? NO YES
If No, describe method for providing potable water: _________________________________________
✔
_____________________________________________________________________________________________
11. Will the proposed action connect to existing wastewater utilities? NO YES
If No, describe method for providing wastewater treatment: ______________________________________
✔
_____________________________________________________________________________________________
12. a. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district NO YES
which is listed on the National or State Register of Historic Places, or that has been determined by the
Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the ✔
State Register of Historic Places?
✔
b. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for
archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain NO YES
wetlands or other waterbodies regulated by a federal, state or local agency?
✔
b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody?
✔
If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: _____________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
Page 2 of 3
Page 717 of 1493
Page 718
14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply:
□Shoreline □ Forest Agricultural/grasslands Early mid-successional
Wetland □ Urban
✔ Suburban
15. Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or NO YES
Federal government as threatened or endangered?
✔
16. Is the project site located in the 100-year flood plan? NO YES
✔
NO YES
17. Will the proposed action create storm water discharge, either from point or non-point sources?
If Yes, ✔
a. Will storm water discharges flow to adjacent properties? ✔
b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)? ✔
If Yes, briefly describe:
_____________________________________________________________________________________________
All Stormwater runoff will be directed to stormwater drains (Re-use existing)
_____________________________________________________________________________________________
18. Does the proposed action include construction or other activities that would result in the impoundment of water NO YES
or other liquids (e.g., retention pond, waste lagoon, dam)?
If Yes, explain the purpose and size of the impoundment:______________________________________________
✔
____________________________________________________________________________________________
_ Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste
19. NO YES
management facility?
If Yes, describe: _______________________________________________________________________________
✔
_____________________________________________________________________________________________
20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or NO YES
completed) for hazardous waste?
If Yes, describe: _______________________________________________________________________________
✔
_____________________________________________________________________________________________
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF
MY KNOWLEDGE
Applicant/sponsor/name: ____________________________________________________
Michael Berger
Date: 3/2/2021
__________________________
_____________________
Architect
Signature: _____________________________________________________Title:__________________________________
PRINT FORM Page 3 of 3
Page 718 of 1493
Page 719
Concept Rendering
NTS
82'-101 4"
22'-01 4"
Parapet Wall
Black Metal Cap
Top Of Parapet Top Of Parapet w/ Signage
(+18'-4 1/2" +/-) (+18'-4 1/2" +/-)
Black Metal Cap Black Metal Cap
Top Of Roof Top Of Roof Black Metal Cap
Framed
(+15'-10 1/2" +/-) Soffit w/ (+15'-10 1/2" +/-)
Down
4'-101 2"
4'-101 2"
Large Large Large
Lighting
Format Up/Down Format Format
Black Lighting Tile Up/Down Lighting Tile
Tile
Large Large
15'-101 2"
15'-101 2"
Format Format
Black Black
8'-10"
8'-10"
Tile Tile
W1 W1 W1 W2 W1 W1 W3 W3
2'-2"
2'-2"
102
Grade Level Grade Level
(+0'-0" +/-) Concrete Water Table (+0'-0" +/-)
Aluminum Framed Concrete Water Table Aluminum Framed Existing Grade Aluminum Framed Storefront Aluminum Existing Grade Aluminum Framed
Windows Windows Windows Framed Entrance Door Windows
South Elevation East Elevation
3/16" = 1'-0" 3/16" = 1'-0"
Parapet Wall PROPOSED EXISTING Black Metal Cap EXISTING PROPOSED
w/ Signage ADDITION BUILDING Top Of Parapet Top Of Parapet Parapet Wall Beyond BUILDING ADDITION
(+18'-4 1/2" +/-) (+18'-4 1/2" +/-)
Black Metal Cap Black Metal Cap Black Metal Cap
Top Of Roof Top Of Roof
(+15'-10 1/2" +/-) (+15'-10 1/2" +/-)
4'-101 2"
4'-101 2"
Large Large Large Large
Format Format Format Format
Tile Up/Down Lighting Tile Up/Down Lighting Tile Up/Down Lighting Tile
Large Large Large Large
15'-101 2"
15'-101 2"
Format Format Format Format
Black Black Black Black
8'-10"
8'-10"
Tile Tile Tile Tile
W3
2'-2"
2'-2"
101
EX Grade Level Grade Level
Existing Building Existing Door & (+0'-0" +/-) (+0'-0" +/-) Existing Building
Storefront Aluminum Existing Grade Aluminum Framed Existing Grade Existing Grade
Framed Entrance Door Windows To Remain Frame To Remain To Remain
West Elevation North Elevation
3/16" = 1'-0" 3/16" = 1'-0"
Proposed Elevations For:
Zen Nails
1976 Ridge Road "D
es ild
"
u
West Seneca, NY 14224
ig
2 B
n
Page 719 of 1493
Page 720
Page 720 of 1493
Page 721
Page 721 of 1493
Page 722
Page 722 of 1493
Page 723
Page 723 of 1493
148.80'
9 0°0
'0"
'
61.75'
30.10'
Existing inal
ig
ete Or
Concr uilding
30.10'
BlockNoB. 1976
61.70' ,46 Ac Site
Aerial View ed
Propos F
119.82'
S
1,698
n
Additio
8
150.0'
Parking Analysis:
Total Site Area: 20,074 sf / 0.460 Acres
Building Areas:
10 Retail Area: 3,550 sf / 0.08 Acres
Parking Calculations:
(3) Parking Spaces Per Salon Chair =
22 Chairs = 66 Parking Spaces
Total Parking Requirements: 66 Parking Spaces
Total Parking Available: 26 Parking Spaces
8 Additional Parking Needed: 40 Parking Spaces
ZBA Approved on April 22nd, 2026
Existing Photo #1 78
°32
'5 "'
'
152.81
G
Existing Photo #2 Site Plan
Proposed Site Plan For:
Zen Nails
1976 Ridge Road
West Seneca, NY 14224
Page 724
Page 724 of 1493
Page 725
Page 725 of 1493
Page 726
Page 726 of 1493
Page 727
Page 727 of 1493
Page 728
Page 728 of 1493
Page 729
Page 729 of 1493
PROJECT TEAM
PROJECT OWNER:
Truc Phan
TEL: (716) 330-0679
PROJECT ARCHITECT:
Sutton Architecture
5409 Main Street
148.80'
Williamsville, NY 14221
CONTACT: Michael Berger
TEL: (716) 932-7156 x205 9 0° 0'0
AUTHORITIES HAVING JURISDICTION "'
BUILDING DEPARTMENT:
Town of West Seneca
1250 Union Road
West Seneca, NY 14224 61.75' 5
TEL: (716) 674-5600
30.10'
Existing inal
ig
ete Or
Concr uilding
30.10'
BlockNoB. 1976
61.70' ,46 Ac Site
ed
Propos
119.82'
SF
1,698
n
Additio
Location of Work Parking Analysis:
Aerial View 9 Total Site Area: 20,074 sf / 0.460 Acres
150.0'
Building Areas:
Retail Area: 3,550 sf / 0.08 Acres
Parking Calculations:
(3) Parking Spaces Per Salon Chair =
22 Chairs = 66 Parking Spaces
4
Total Parking Requirements: 66 Parking Spaces
Total Parking Available: 26 Parking Spaces
Additional Parking Needed: 40 Parking Spaces
Existing Photo #1 ZBA Approved on April 22nd, 2026
8
78
°3 2 '5"'
'
152.81
Existing Photo #2
Site Plan
Proposed Site Plan For:
Zen Nails
1976 Ridge Road
West Seneca, NY 14224
Page 730
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, New York
AGENCIES UTILITIES
OWNER/DEVELOPER
Name: Brian Hillery & William Sahlem
Address: 1 Woodthrush Trail
Orchard Park
Telephone: (716) 512-3425
LOCATION MAP
NOT TO SCALE
80 Silo City Row 111 Bain Street, Suite 332
Buffalo, New York 14203 Greensboro, North Carolina 27406
Phone: (716) 842-3165 Phone: (336) 937-9009
DESIGN CONSULTANTS
May 2026
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, New York
Page 730 of 1493
Page 731
MH
PREPARED FOR:
RIM:676.70
NW. INV:688.25 (12")
SE. INV:668.09 (12")
BRIAN HILLARY &
WILLIAM SAHLEM
1 WOODTHRUSH TRAIL
EX. PIN ORCHARD PARK
NEW YORK 14127
APPROX. LOCATION
682
CB
S.
SW
" RIM:680.53
M 8'-
32
.L
.& N. INV:671.23 (18")
EX 25' N .
D -5 683
IN
' 0°
5. 32' E
6 S. INV:671.23 (18")
.N .
E
.5 5 10
0.
3 52 67
W
680
AI
21
I LL
L
87°-09'-45"
8 .0
IE
PROJECT:
PA
684
TH L-8
RA
4'
E
LL
W 3 70,
CB
D.
. T
EL
HA P
LO
MS
RIM:683.34
T. 1425 & 1475 ORCHARD PARK ROAD,
&
W
LE -31
BI 68 5 N. INV:672.94 (18")
&
/S
D.
M
IN 9
S. INV:673.10 (18") TOWN OF WEST SENECA,
W
C.
'
S.
. 00
.L
68 0 COUNTY OF EIRE,
IN PAR
0
1.0
20 686
PP .
E
STATE OF NEW YORK
'E
OR K R
12"
EX. REBAR
CH OA
4.11' N.
AR D
23
MH
687
N
D
RIM:685.89
O
AY BEING PART OF
7 .6
TI
EW
CA
NW. INV:676.14 (12")
680
CO 9.8'
V LOTS 369 & 417, TOWNSHIP 10 RANGE 7
RI
2'
67 5
LO
SE 1142
D SE. INV:676.22 (12")
683
113°-18'-53"
NC
T.
L-
E BUFFALO CREEK RESERVATION
. C 0,
BI
D.
X.
ON
5
.P
O
7" ST
OR P-5
PR
AD
&
12"
.H 3
AP
671 .0'
MS
CB SBL No. 143.19-1-8 & 143.19-1-9
ILL
L-11420 23
ER
EX. PIN RIM:685.39 & 152.07-1-1
. 0
Y
N. INV:677.49 (18")
P-53
&
PP 8' E.
W. LINE HILERY& SAHLEM
S. INV:677.49 (16")
SA
180.00' D. & MS.
672
.
E. INV:676.99 (4")
HL
691
EM
EX 89' N
5. /L
.R .
±O
685
4.18' MS.
EB
2 12" 7"
AR
67
OR
NE 1144
10" & SAHLEM
S. LINE HILLERY
L-
PP
. C 2,
L-11420, P-53 1.0' E.
OR P-8 143
N
CH
MS. S. LINE CICHO
0 ' D. & 794.95'
. H 36
4
12.0 CH. = 792.0 L-11283, P-375 694
ILL
660.00' D. = 656.13' MS. 3 PP
67
ER
AR
EX. IP.
Y
11
&
5
PP
TER'S CHURCH 7.27' NW.
°-0
.86
' MS.
SA
NW. COR. LOT 417 90°-59'-13" N. LINE ST. PE
263.56
4'-
PARKING
'M
HL
D
S.
1
L-139, P-466
670
69
47
0' M
EM
S.
LOT
S. LINE LOT 369
.0
"
4
S. LINE LOT 369
692
9
105
3
69
PA
68
69
0
663
68 8
69
12"
5
EX. IP. 7 A
5
N. LINE LOT 417 RE PO Box 207
6
66
69
EX. IP. EX. PIN
66
.A
66
RK
N. INV: 660.98 (18" HDPE) 9.68' E. 3.77' N.
W. INV: 682.97 BIT Sanborn, New York 14132
12" (12" HDPE) 170°-37'-13"
89°-57'-36" PHONE: (716) 587-8380
668
HYD
2
4.05' W. APPROX. LOCATION
68
68 0 FAX: 716.587.8379
669
OF CEMETERY ST
RO
6" HEAD STONES NOT WEBSITE: www.360landsurvey.com
NE. INV: 680.89 (6" HDPE)
LOCATED 127°-49'-44"
NE A S S 7, P
AD
14"
W 332
28" 30"
. C MA -87
L-
40" 14"
OR N
MS.
674
18" EX. IP.
.
91
(6
4 NW. INV: 673.14 (12" CMP) 7"
66
°-4
. 00'
CL
4'-
6.0
ST
44
23"
15 0
"
SW. INV: 680.34 (6" HDPE)
12"
')
W. INV: 680.32 (6" HDPE)
SE. INV: 673.26 (12" CMP) 30" PARKING
68 7
S. INV: 662.31 (18" HDPE) LOT
16"
6 75
SW
34"
670
16
68 6
.L
EX. IP. E. INV: 680.75 (6" PVC)
7. 4
IN
65
.
6
683
O/L MS
3'
67 2
E
6 18"
68 PART OF .&
D
OR
1
4
146°-28'-21"
.&
'D
W. LINE LOT 417
68
68
.7 1
C
19" L-11442, P-836
5
MS
HA
9
68
29
77
.
RD
6 0
PA
68 TOTAL AREA =
RK
8 5 .0
RO
16.59 AC.
AD
NW. COR.
0' MS
WASSMAN 38"
VERIFIED NYSDEC WETLAND
PART OF 30" EXCEPTION
537.24' D. & MS.
8
69 0
.
100-FOOT ADJACENT AREA 149°-26'-50"
67
L-3327
EXCEPTING & RESERVING
11"
(APPROXIMATE LOCATION)
L-11442 10 24" EX. IP. P-87
HIGHWAY PURPOSES
PARKING
666
3. 2.04' NW.
60' WIDE STRIP FOR
P-836 LOT 00
'D
.&
PARCEL "A" M
S.
SCRUB SHRUB WETLANDS (PSS) 90 36"
33
(APPROXIMATE LOCATION) .0 5 8.
0 153°-18'-56"
"
0'
69
14"
10
'M D.
6'-
6
&
9
S.
°-4
7
24"
66
M
67
66
S.
89
8"
S.
M
&
D.
675
66 8
S.
113°-43'-57"
0'
'M
M 9'
0.
S.
. & .3
18"
20
00
D 51
0
0
3.
1
70
68
11
669
5" 2 00
T
. 00'
ND
32"
MS.
RA
S.
681
M
.B
.&
NE
'D
670
EX. REBAR
LI
682
S.
96
N.
M
7.
EXCEPTION
26
.&
'D
8" 12" 11"
O/L
L-3036
70
LC
2.
12" 6" 8"
671
12"
70 S.
M '
26
. & 00
7"
P-217
S.
D 75.
'M
20" 6"
M '
4
. & 89
3
S.
68
70
6" 12"
D 72.
6" 13"
9.
72 6"
14
6
')
EX. IP.
0
5
68
133°-32'-58"
0
12.33' W.
0.
67
673 5
69
(7
EX. IP.
3.20' S.
NW. COR. BRANDT 275.56' D. & MS.
674
AD
87°-23'-54" N. LINE ULRICH
700 705 L-3036, P-217 710
L-1120, P-212
RO
675 6
NW COR. ULRICH
L-1120, P-212 20" 68
7
8
68 68
9
695
68
N. INV: 669.78 (18" HDPE)
RG
676
683
684
685
1
113°-18'-53"
682
68
0 1190.00' MS.
BE
677 68
678 679 1510.08' D. = 1514.03' MS.
AD
RO
RG
BE
E
IN
.L
NW
1 SANITARY MH INFORMATION 4/29/2026
REV. NOTE DATE
UNAUTHORIZED ALTERATION OR ADDITION
TO THIS SURVEY MAP IS A VIOLATION OF
SECTION 7209. PROVISION 2 OF THE NEW
YORK STATE EDUCATION LAW.
0" 1" 2"
BITUMINOUS BIT. EAST E. PAVEMENT EDGE PE SHEET SCALE BAR
ADJUST ACCORDINGLY IF SCALE
BUILDING
ELEVATION ELEV POWER POLE PP IS NOT TWO INCHES
DRAWING NAME
BLDG.EXISTING EX. POLYVINYL CHLORIDE PVC
CATCH BASIN FENCE FNC.
SANITARY SEWER SMH
GENERAL NOTES: CONCRETE CONC. FIRE HYDRANT MAN HOLE
2"
1. THIS SURVEY WAS PREPARED FROM A FIELD SURVEY BY 360 LAND SURVEY, DPC. ON FEBRUARY 27, 2026. CONIFEROUS TREE W/ HIGH-DENSITY HPDE SOUTH S.
DIAMETER POLYETHYLENE
2. HORIZONTAL DATUM: NORTH AMERICAN DATUM OF 1983 (NAD83), ESTABLISHED WITH GPS USING THE NEW YORK STATE
DEPARTMENT OF TRANSPORTATION REAL TIME NETWORK (NYSDOT RTN). (US SURVEY FEET) .
CORRUGATED METAL PIPE CMP
2"
IRON PIPE
SPOT ELEVATION
STORY STY.
TOPOGRAPHIC
DECIDUOUS TREE W/ INVERT INV.
3. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), ESTABLISHED WITH GPS USING THE NEW YORK STATE DIAMETER
NORTH N.
WATER VALVE
WEST
WV
W.
SURVEY
DEPARTMENT OF TRANSPORTATION REAL TIME NETWORK (NYSDOT RTN). (US SURVEY FEET).
MAJOR CONTOUR LINE (5') XXX PROPERTY LINE TREE
WITH LINE W/
4. UTILITY INFORMATION SHOWN ON THIS MAP IS FROM VISIBLE FIELD EVIDENCE AT THE TIME OF FIELD SURVEY, FIELD MARKOUTS BY
MINOR CONTOUR LINE (1') XXX OVERHEAD ELECTRIC LINE OE UNDERGROUND
UTILITY COMPANIES, AND INFORMATION PROVIDED BY A 811 DESIGN TICKET. COM R
COMMUNICATIONS
FENCE LINE (AS NOTED) SANITARY STORM SA
5. WETLANDS INFORMATION TAKEN FROM A WETLAND AND STREAM DELINEATION SURVEY COMPLETE BY LABELLA, PROJECT No: UNDERGROUND UE
GAS LINE G STORM SEWER LINE ST
ELECTRIC
2251287 DATE: 12/1/2025. PROJ. NO. 26-040 SCALE 1"=60'
WATER LINE WV PTH 3/17/2026
Know what's below.
CREW DATE
SCRUB SHRUB WETLAND (PSS) VERIFIED NYSDEC WETLAND
CEMETERY LIMITS
100-FOOT ADJACENT AREA DWN. AJM CHK. CJS
TOPOGRAPHIC SURVEY LIMITS Call before you dig. DRAWING NUMBER
SHEET 1 OF 1
Page 731 of 1493
Page 732
EX. PIN CB
UE
RIM:683.34
G
APPROX. LOCATION
W
N. INV:672.94 (18")
ST
S. INV:673.10 (18")
SA
CB
OE
2" RIM:680.53
UE
8 '-3 N. INV:671.23 (18")
EX 5' N .ST
CB
°-5
G
5.2 32' E OE
0 S. INV:671.23 (18")
.N .
SILT FENCE/SILT SOCK 10 RIM:685.39
0W.
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
AI
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
(LIMIT OF DISTURBANCE) N. INV:677.49 (18")
L
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
87°-09'-45" S. INV:677.49 (16")
Greensboro
E. INV:676.99 (4")
UE
SA G
UE
OR
T MH
LO
W
CONCRETE B IT. RIM:685.89
NW. INV:676.14 (12")
UE
C
WASHOUT PIT
SE. INV:676.22 (12")
UE
HA
1.0
PP .
G OE
SW
SA
'E
T
UE
12"
EX. REBAR
R
4.11' N.
Utica
D
N
UE
O
AY
TI
EX. TREE TO BE EW
STABILIZED
X. UE
CA
CO
IV
G E
PA
REMOVED (TYP.) DR CONSTRUCTION
LO
O
W
NC
113°-18'-53" T.
BI ENTRANCE ONE
59
.P
O
7" ST
.8'
SA S
PR
AD
RK
UE
UE
12"
Buffalo
TOPSOIL STOCKPILE
AP
.0'
T
L-11420 W/ SILT FENCE 23
G E
EX. PIN
O
W
RO
EX. CONCRETE PAD AND
P-53
UE
PP 8' E.SA GSW
DRIVEWAY TO BE REMOVED
0.
UE
EX. TREE TO BE
AD
EX. TREES TO BE CLEARED. REFER REMOVED (TYP.)
EX 9' N
OE
UE
5.8 /L
.R .
T
TO SITE PLAN C-100 FOR LIMITS.
±O
EB
7"
(6
12"
AR
UE
D A
AN E ARE
10"
UE
6.0
EX. SITE TO BE CLEARED AND T
GRUBBED WITHIN DISTURBANCE EN AG
IPM STOR
SA SOE
U
LIMITS (SILT FENCE) AS SHOWN EQ IAL
')
OE
UE
TER
UE
PP
G
T
OE PP
MA OE
OE 1.0' E.
W
OE EX. IP.
14
11
INSTALL PROPOSED DETENTION BASIN DURING INITIAL PHASE OE
3 .8
5
PP 7.27' NW.
°-0
NW. COR. LOT 417 INSTALL PROTECTIVE FENCING
OF CONSTRUCTION TO ACT AS SEDIMENT BASIN. CLEAN TO
6'
UE
4'- SA W
PARKING
OE
MS
AROUND CEMETERY DURING
Multifamily Development
DESIGN GRADE FOLLOWING STABILIZATION. INSTALL
47
LOT
OE
.
S. LINE LOT 369
"
G
BIORETENTION SOIL AFTER SITE HAS BEEN STABILIZED. CONSTRUCTION
W
ST
12"
UE
EX. IP. A
RE
OE
.A
N. INV: 660.98 (18" HDPE) BIT
675 12" 170°-37'-13"
OE
89°-57'-36" 674
673
672 APPROX. LOCATION HYD
671 EX. TREES TO BE REMOVED
WG
670 OF CEMETERY
SA S
UE
6" HEAD STONES NOT NE. INV: 680.89 (6" HDPE)
LOCATED
T OE
673
127°-49'-44"
673
14"
28" 30"
40" 14"
UE
18" EX. IP.
W. INV: 682.97
NW. INV: 673.14 (12" CMP) 7" EX. TREE TO BE (12" HDPE)
ST
REMOVED (TYP.) EX. 6" PIPE TO
23" UE EX. 12" PIPE TO
BE REMOVED
1425 & 1475 Orchard Park Rd
COM
BE REMOVED SW. INV: 680.34 (6" HDPE)
12" W. INV: 680.32 (6" HDPE)
SE. INV: 673.26 (12" CMP) 30" PARKING
S. INV: 662.31 (18" HDPE) LOT
16"
UE
34"
EX. IP. E. INV: 680.75 (6" PVC)
MATERIAL STORAGE AREA
.
O/L MS
18" PART OF D.
&
EQUIPMENT AND
146°-28'-21"
W. LINE LOT 417
1'
UE
19" L-11442, P-836 9.7
© CARMINA WOOD DESIGN
29
West Seneca, NY
TOTAL AREA =
UE
TOPSOIL STOCKPILE
16.59 AC. W/ SILT FENCE
38"
UE
PART OF EXCEPTION
COM
30"
149°-26'-50"
11" L-3327
L-11442 10 24" EX. IP. P-87
PARKING 3. 2.04' NW.
P-836
UE
LOT 00
'D
.&
PARCEL "A" M
S.
SCRUB SHRUB WETLANDS (PSS) SILT FENCE/SILT SOCK 36"
33
(LIMIT OF DISTURBANCE) EX. SITE TO BE CLEARED AND
UE
(APPROXIMATE LOCATION) 153°-18'-56" 8.
"
14" 0'
10
GRUBBED WITHIN DISTURBANCE D
6'-
.&
LIMITS (SILT FENCE) AS SHOWN
°-4
24" M
Date
S.
89
8"
UE
S.
113°-43'-57"
'M
18"
00
3.
11
UE
COM
5"
T
ND
32"
RA
.B
UE
EX. TREE TO BE
NE
EX. REBAR
No. Description
LI
REMOVED (TYP.)
S.
N.
M
EXCEPTION
.&
'D
12"
REVISIONS:
8" 11"
O/L
L-3036
70
2.
12" 6" 8" 12"
26
7" P-217
20" 6"
& 89'
S.
6" 12"
D. 72.
M
6" 13"
6"
')
.0
EX. IP.
133°-32'-58" 12.33' W.
0
(7
COM
EX. IP.
3.20' S.
275.56' D. & MS.
AD
87°-23'-54"
RO
20"
N. INV: 669.78 (18" HDPE)
RG
BE
EROSION CONTROL NOTES
NOTES:
THE FOLLOWING EROSION CONTROL PROCEDURES SHALL BE ADHERED TO BY THE CONTRACTOR:
1. INSTALL TEMPORARY SILT FENCE BARRIERS AS DIRECTED BY THE OWNER AND AT ALL EXISTING STORMWATER CATCH BASINS WITHIN THE WORK AREA TO PREVENT SEDIMENT MIGRATION. ALL
Demo & Erosion Control Plan 1. THE CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT THOSE ITEMS TO REMAIN, SUCH AS TREES, PROPERTY CORNER
PINS, UTILITY POLES, VALVES, HYDRANTS, CURBS, MANHOLES AND CATCH BASINS.
SILT FENCE BARRIERS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS SHOWN ON THE PLANS.
SCALE: 1"=50' 2. TEMPORARY SILT FENCE AND STRAW BALES TO BE INSTALLED AS DIRECTED BY THE OWNERS FIELD REPRESENTATIVE.
2. TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON SITE FOR RE-USE AS DIRECTED BY THE OWNER. ALL LOCAL ORDINANCES REGARDING THE SALE OF TOPSOIL MUST BE FOLLOWED. TOPSOIL MAY MAINTAIN UNTIL VEGATATION IS ESTABLISHED AND PAVEMENT IS INSTALLED.
NOT BE REMOVED WITHOUT A PERMIT.
3. FOR THOSE STRUCTURES TO BE DEMOLISHED, ALL EXISTING UTILITY SERVICES SHALL BE ABANDONED IN ACCORDANCE WITH
3. ALL SILT FENCE BARRIERS SHALL BE REPLACED WHEREVER THEY BECOME CLOGGED OR INOPERABLE. LOCAL REGULATIONS, ALL METERS SHALL BE RETURNED TO PROPER OWNERS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND REMOVAL OF TEMPORARY SEDIMENTATION CONTROLS. 4. THE CONTRACTOR SHALL INSTALL STABILIZED CONSTRUCTION ENTRANCES WHERE ACCESSING THE SITE FROM PAVED
ROADWAYS. DEMO & EROSION CONTROL LEGEND: DRAWING NAME:
5. THE CONTRACTOR MUST CONTROL DUST DURING CONSTRUCTION. DURING EARTHWORK OPERATIONS, WATER-SPREADING EQUIPMENT SHALL BE PROVIDED BY THE CONTRACTOR, AND SPREAD
WATER AS NECESSARY AND AS DIRECTED BY THE OWNER IN ORDER TO CONTROL DUST. 5. THE CONTRACTOR SHALL INSTALL TEMPORARY TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH NYS M.U.T.C.D.
STANDARDS PRIOR TO STARTING WORK. INSTALL STORM DRAINAGE INLET PROTECTION
Demo & Erosion
6. DIRT OR DEBRIS LEFT ON LOCAL PUBLIC ROADS AS A RESULT OF THIS CONSTRUCTION PROJECT SHALL BE REMOVED AND ROAD SURFACES CLEANED BY THE CONTRACTOR ON A DAILY BASIS. Control Plan
7. ALL DISTURBED AREAS (EXCEPT AREAS TO BE PAVED OR BUILT UPON) SHALL BE TOPSOILED TO A MINIMUM 4" DEPTH AND SEEDED IMMEDIATELY AFTER FINE GRADING TAKES PLACE AND AS SOON
AS PHYSICALLY POSSIBLE.
PROPOSED SILT FENCE/SILT SOCK
8. THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE OF DOWNSTREAM STORM SEWERS, DITCHES, AND CULVERTS. SILT BUILDUP FOUND TO BE A RESULT OF THIS SITE CONSTRUCTION
WORK SHALL BE REMOVED FROM DOWNSTREAM CULVERTS BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER OR THE TOWN/CITY.
Date: 5/22/26
9. ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN PLACE PRIOR TO BEGINNING EARTHWORK OPERATIONS AND SHALL BE MAINTAINED UNTIL THE NEW SLOPES ARE Drawn By: A. Pandolfe
STABILIZED WITH SEEDING AND/OR SLOPE PROTECTION, AS DIRECTED BY THE ENGINEER. Scale: As Noted
10. INSTALL TEMPORARY SILT FENCE AROUND THE BASE OF STOCKPILES.
DRAWING NO.
11. THE PROFESSIONAL CERTIFYING COMPLIANCE TO NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS MUST INSPECT AT A MINIMUM WEEKLY AND SHALL PROVIDE THESE INSPECTION
REPORT WITH A WRITTEN CERTIFICATION OF CONSTRUCTION COMPLIANCE TO THE
WEST
TOWN
SENECA
OF WEEKLY.
12. THE ENGINEER OF RECORD FOR THIS PROJECT CERTIFIES THAT THESE DESIGN PLANS MEET THE REQUIREMENTS AND ARE IN COMPLIANCE WITH THE NEW YORK STORMWATER MANAGEMENT
DESIGN MANUAL AND NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS. DUE TO SOIL DISTURBANCE BEING GREATER THAN ONE ACRE, A NYSDEC SPDES PERMIT MUST BE OBTAINED
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
50 0 50 100Ft.
C-001
50' Project No: 23-4121
BEFORE ANY ON-SITE DISTURBANCE IS MADE.
Page 732 of 1493
Page 733
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
SANDBAG
10 mil PLASTIC LINING
Utica
3'
2"X4" WOOD FRAME
DEWATERING CONCRETE BLOCK BERM
1.5' MAX. STAKE SECTION A-A
FLOW NOT TO SCALE
FLOW
Buffalo
FABRIC LATH AND
STRAW BALE FLAGGING ON
2:1 SLOPE GRAVEL FILTER 10' MIN.
BINDER WIRE 3 SIDES
3' MIN.
STONE & BLOCK PLAN VIEW STAPLES PLYWOOD
(2 PER BALE) 10 mil PLASTIC SANDBAG
LINING 48"X24" BLACK LETTERS
TEMPORARY WIRE SCREEN PAINTED WHITE 6" HEIGHT
SEDIMENT POOL DEWATERING A A
VARIES
SECTION B-B CONCRETE LAG SCREWS
DROP INLET BURIED FABRIC WOOD OR NOT TO SCALE
WASHOUT
WITH GATE 1'MIN. 16" METAL STAKES WOOD POST
FLOW
36"
FRAME 2'MAX. (2 PER BALE) 10' MIN. 3.5"X3.5"X8'
FLOW
BERM
36"
2" DROP INLET
EXCAVATED AREA (AS REQUIRED) WITH GATE
1' MIN. CONCRETE WASHOUT 10 mil PLASTIC LINING
SEDIMENT B B SIGN DETAIL PLAN
(OR EQUIVALENT)
VARIES
SIDE SLOPE 2:1 GATHER EXCESS AT TEMPORARY SEDIMENT POOL STONE & BLOCK DETAIL NOT TO SCALE
CORNERS 2" TYPE "BELOW GRADE"
Multifamily Development
1'MIN. 2:1 SLOPE 3:1 SLOPE WIRE MESH (OPTIONAL)
EXCAVATED DEPTH MIN. 1' TO A
CONSTRUCTION SPECIFICATIONS 2'MAX. 1' 10 mil PLASTIC LINING
8"
MAX. 2' BELOW TOP OF INLET. WEEP HOLES GRAVEL SUPPORTED BY HARDWARE 1.12" DIA
FOR CLOTH TO ALLOW DRAINAGE AND 1. FILTER FABRIC SHALL HAVE AN EOS OF 40-85. BURLAP MAY BE USED FOR SHORT TERM APPLICATIONS. FINE GRAVEL FACE STEEL WIRE
DEWATERING RESTRICT SEDIMENT MOVEMENT. (1'MIN. THICKNESS) STAPLE
3" STONE 10 mil PLASTIC LINING STRAW BALE DETAIL
2. CUT FABRIC FROM A CONTINUOUS ROLL TO ELIMINATE JOINTS. IF JOINTS ARE NEEDED THEY WILL BE OVERLAPPED TO PLAN (TYP) WOOD FRAME SECURELY
THE NEXT STAKE. "DOUGHNUT" DETAIL NOT TO SCALE FASTENED AROUND SECTION B-B
ENTIRE PERIMETER NOT TO SCALE
3. STAKE MATERIALS WILL BE STANDARD 2" x 4" WOOD OR EQUIVALENT. METAL WITH A MINIMUM LENGTH OF 3 FEET. TYPE "ABOVE GRADE" WITH STRAW BALES WITH TWO STAKES
CONSTRUCTION SPECIFICATIONS
CONSTRUCTION SPECIFICATIONS 4. SPACE STAKES EVENLY AROUND INLET 3 FEET APART AND DRIVE A MINIMUM 18 INCHES DEEP. SPANS GREATER THAN 3 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE FOR DEWATERING. FOUNDATION SHALL BE 2 INCHES MINIMUM BELOW REST NOTES
OF 10' MIN.
FEET MAY BE BRIDGED WITH THE USE OF WIRE MESH BEHIND THE FILTER FABRIC FOR SUPPORT. INLET AND BLOCKS SHALL BE PLACED AGAINST INLET FOR SUPPORT. TWO-STACKED
1. CLEAR THE AREA OF ALL DEBRIS THAT WILL HINDER EXCAVATION. 1. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD. 2X12 ROUGH
5. FABRIC SHALL BE EMBEDDED 1 FOOT MINIMUM BELOW GROUND AND BACKFILLED. IT SHALL BE SECURELY FASTENED TO2. B B WOOD FRAME
HARDWARE CLOTH OR 1/2" WIRE MESH SHALL BE PLACED OVER BLOCK OPENINGS TO SUPPORT STONE. 2. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30' OF THE
2. GRADE APPROACH TO THE INLET UNIFORMLY AROUND THE BASIN. THE STAKES AND FRAME.
TEMPORARY CONCRETE WASHOUT FACILITY.
1425 & 1475 Orchard Park Rd
VARIES
3. USE CLEAN STONE OR GRAVEL 1/2-3/4 INCH IN DIAMETER PLACED 2 INCHES BELOW TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER.
3. WEEP HOLES SHALL BE PROTECTED BY GRAVEL. 6. A 2" x 4" WOOD FRAME SHALL BE COMPLETED AROUND THE CREST OF THE FABRIC FOR OVER FLOW STABILITY. 3. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT STAKE (TYP)
4. FOR STONE STRUCTURES ONLY, A 1 FOOT THICK LAYER OF THE FILTER STONE WILL BE PLACED AGAINST THE 3 INCH STONE AS SHOWN ON THE FACILITIES SHALL BE REMOVED FROM THE SITE OF THE WORK AND
4. MAXIMUN DRAINAGE AREA 1 ACRE
UPON STABILIZATION OF CONTRIBUTING DRAINAGE AREA, SEAL WEEP HOLES, FILL BASIN WITH STABLE SOIL TO FINAL GRADE, DRAWINGS. DISPOSED OF OR RECYCLED.
COMPACT IT PROPERLY AND STABILIZE WITH PERMANENT SEEDING.
MAXIMUM DRAINAGE AREA 1 ACRE 4. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY
MAXIMUM DRAINAGE AREA 1 ACRE THE REMOVAL OF THE TEMPORARY CONCRETE WASHOUT FACILITIES TYPE "ABOVE GROUND"
SHALL BE BACKFILLED, REPAIRED, AND STABILIZED TO PREVENT 10 mil PLASTIC LINING
PLAN WITH WOOD PLANKS
© CARMINA WOOD DESIGN
EROSION.
NOT TO SCALE
West Seneca, NY
INLET PROTECTION DETAIL 1 INLET PROTECTION DETAIL 2 INLET PROTECTION DETAIL 3 CONCRETE WASHOUT DETAIL
NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE
NOTE: INSTALL ONE OF THE INLET PROTECTION OPTIONS SHOWN PRIOR TO CONSTRUCTION
50'MIN. EXISTING
PAVEMENT
Date
FILTER CLOTH (SECURELY ATTACHED 3' 5:
1
TO STAKES) 6"MIN.
10' MAX. C. TO C. MOUNTABLE BERM
EXISTING FILTER
GROUND CLOTH PROFILE (OPTIONAL)
36" MIN. LENGTH FENCE POSTS DRIVEN
MIN. 16" INTO GROUND
50'MIN.
HEIGHT OF FILTER = 16" MIN. REFER TO 10'MIN.
EXISTING NOTE #7
GROUND
EMBED FILTER CLOTH A EXISTING
OW 12'MIN.
No. Description
FL OW MIN. OF 6" IN GROUND. 12'MIN. / 24' MAX. PAVEMENT
FL
WOODEN STAKES ON 10' LINEAL
REVISIONS:
SPACING REFER TO
FILTER CLOTH DEPTH PERSPECTIVE VIEW 2"x2" WOODEN STAKE NOTE #7 10'MIN.
MARKINGS
SILT SOCK (8" MIN) PLAN VIEW
AREA TO BE
PROTECTED 3" TO 4" CONSTRUCTION SPECIFICATIONS
36" MIN. FENCE POST
POSTS SHALL BE A MINIMUM OF 20" WATER FLOW AREA TO BE PROTECTED
SILT SOCK WORK AREA 1. STONE SIZE - USE 2" STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.
FILTER CLOTH ATTACHED TO POST ABOVE THE EXISTING GRADE
FLOW 2. LENGTH - NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE LOT WHERE A 30 FOOT MINIMUM LENGTH WOULD
UNDISTURBED GROUND WORK AREA APPLY).
12"±
COMPACTED SOIL
3. THICKNESS - NOT LESS THAN SIX (6) INCHES.
EMBED FILTER CLOTH POSTS SHALL BE A MINIMUM OF 16"
A MIN. OF 6" IN GROUND BELOW THE EXISTING GRADE 4. WIDTH - TWELVE (12) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS
4" OCCURS. TWENTY-FOUR (24) FOOT IF SINGLE ENTRANCE TO SITE.
SECTION VIEW PLAN VIEW SECTION VIEW
5. FILTER CLOTH - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE.
NOTES: 6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED
CONSTRUCTION SPECIFICATIONS
ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED.
CONTRACTOR SHALL INSPECT AND MAINTAIN SILT SOCK AS NEEDED DURING THE DURATION OF CONSTRUCTION PROJECT.
1. WOVEN FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. POSTS SHALL BE STEEL EITHER "T" 7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING
OR "U" TYPE OR HARDWOOD. CONTRACTOR SHALL REMOVE SEDIMENT COLLECTED AT THE BASE OF THE SILT SOCK WHEN IT21HAS
OF THE
REACHED
EXPOSED OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACTED ONTO PUBLIC
HEIGHT OF THE SILT SOCK. ALTERNATIVELY, RATHER THAN CREATE A SOIL DISTURBING ACTIVITY, THE ENGINEER MAY CALL FOR RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY. TEMPORARY ASPHALT SHALL BE PLACED WITHIN RIGHT-OR-WAY TO
2. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER-LAPPED BY SIX INCHES AND FOLDED. ADDITIONAL SILT SOCK TO BE ADDED AT AREAS OF HIGH SEDIMENTATION, PLACED IMMEDIATELY ON TOP OF THE EXISTING ENSURE THIS.
FILTER CLOTH SHALL BE EITHER FILTER X, MIRAFI 100X, STABILINKA T140N, OR APPROVED EQUIVALENT. SEDIMENT LADEN SILT SOCK.
8. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON A AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN
3. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE. APPROVED SEDIMENT TRAPPING DEVICE.
9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN.
SILT SOCK DETAIL STABILIZED CONSTRUCTION ENTRANCE DETAIL DRAWING NAME:
NOT TO SCALE
SILT FENCE DETAIL NOT TO SCALE
Demo & Erosion
NOT TO SCALE
Control Details
Date: 5/22/26
Drawn By: A. Pandolfe
Scale: As Noted
DRAWING NO.
C-002
Project No: 23-4121
Page 733 of 1493
Page 734
UE
EX. PIN CB
UE
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
RIM:683.34
G
APPROX. LOCATION
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
W
N. INV:672.94 (18")
ST
Greensboro
S. INV:673.10 (18")
SA
CB
OE
" RIM:680.53
32
UE
8'- N. INV:671.23 (18")
EX 5' N .ST
CB
°-5
G
5.2 32' E OE
0 S. INV:671.23 (18")
.N .
10 RIM:685.39
0W.
AI
N. INV:677.49 (18")
L
87°-09'-45" S. INV:677.49 (16")
E. INV:676.99 (4")
UE
LIMIT OF TREE CLEARING
SA G
UE
OR
T MH
LO
W
Utica
ACK T. RIM:685.89
IDE SETB BI
25' S
UE
NW. INV:676.14 (12")
CH
SE. INV:676.22 (12")
UE
25'
SI D
PRO
1 .0
E
PP .
G OE
SE T
AR
20'x8.5' MAIL KIOSK
SW
PO /AT
SA
'E
BAC
T
UE
Buffalo
SED TA
K
EX. REBAR & BUS SHELTER
W
1-S CHED
4.11' N.
D
N
UE
TO G
O
TI
RY AR
X. UE
CA
G E
PA
5-U AGE
LO
O
W
113°-18'-53"
NIT S
O
PROPOSED 1-STORY 4-UNIT BUILDING
BU
SA S
PR
RK
UE
IL
UE
AP
DIN
40'
ING
T
FRO
W/ATTACHED GARAGES
G
ILD
NT
G E
PROPOSED 1-STORY 4-UNIT BUILDING
EX. PIN
O
SET
BU
W
RO
BA
I T
CK
UN ES
UE
PP 8' E.SA GSW
-4 ARAG
0.
UE
Y
W/ATTACHED GARAGES
OR G
-ST CHED
A
1
SED TA
EX 9' N
OE
UE
PO W/AT
D
5.8 /L
.R .
T
O
±O
PR
30' REAR SETBACK
EB
STOP
(6
AR
UE
UE
6. 0
Multifamily Development
SA SOE
')
OE
UE
UE
PP
G
T
OE PP
OE 1.0' E.
OE
W
OE EX. IP.
14
11
OE
3.8
5°
PP 7.27' NW.
NW. COR. LOT 417
-0
BACK
6'
UE
LIMIT OF TREE CLEARING E SET
4'- SA W
PARKING
OE
25' SID
MS
47
STOP LOT
OE
.
S. LINE LOT 369
"
G
W
ST
12"
UE
EX. IP. EA
OE
. AR
N. INV: 660.98 (18" HDPE) BIT
25' SIDE SETBACK 12" 170°-37'-13"
OE
89°-57'-36"
APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF HYD
WG
OF CEMETERY CEMETERY AND NOTIFY DESIGN
SA S
UE
HEAD STONES NOT ENGINEER OF ANY POTENTIAL CONFLICTS
STORM WATER LOCATED
T OE
127°-49'-44"
1425 & 1475 Orchard Park Rd
MANAGEMENT AREA 14"
28"
14"
UE
EX. IP.
W. INV: 682.97
(12" HDPE)
ST
23"
UE
COM
12"
© CARMINA WOOD DESIGN
PARKING
S. INV: 662.31 (18" HDPE)
West Seneca, NY
LOT
UE
EX. IP.
729.52' .
O/L STOP PART OF &
MS
97.18' 146°-28'-21" D.
W. LINE LOT 417
1'
UE
L-11442, P-836 29
9.7
PROPOSED 1-STORY 6 UNIT BUILDING
UE
PROPOSED 1-STORY 6 UNIT BUILDING
W/ATTACHED GARAGES
38"
W/ATTACHED GARAGES
UE
EXCEPTION
COM
30"
149°-26'-50"
11" L-3327
10 24" EX. IP. P-87
30' REAR SETBACK
PARKING
Date
3. 2.04' NW.
UE
LOT 00
'D
.&
M
S.
SCRUB SHRUB WETLANDS (PSS) 36"
33
UE
(APPROXIMATE LOCATION) 153°-18'-56" 8.
"
14" 0'
10
D.
6'-
&
°-4
24" M
S.
89
8"
UE
S.
113°-43'-57"
'M
18"
00
No. Description
729.26'
3.
11
UE
COM
REVISIONS:
5"
T
ND
RA
.B
UE
NE
EX. REBAR
LI
S.
N.
M
EXCEPTION
.&
'D
8" 12" 11"
O/L
L-3036
70
2.
6" 8"
144.58'
12"
146.98'
150.63'
12"
26
153.06'
7" P-217
20" 6"
& 89'
S.
6" 12"
D. 72.
M
6" 13"
6"
0')
EX. IP.
133°-32'-58"
0.
25' SIDE SETBACK 12.33' W.
(7
COM
EX. IP.
3.20' S.
275.56' D. & MS.
AD
87°-23'-54"
RO
20"
N. INV: 669.78 (18" HDPE)
RG
SITE DATA ( REZONED TO C-1 (S) ) - 1425 & 1475 ORCHARD PARK RD - 16.59 ACRES GENERAL NOTES:
Overall Site Plan SITE LEGEND
BE
MULTI-FAMILY ALLOWED BY SPECIAL PERMIT 1. INSTALL ALL MATERIALS TO MANUFACTURER'S RECOMMENDATIONS AND BEST STANDARDS OF TRADE
INVOLVED. PROPERTY LINE
MIN. LOT WIDTH = 50 FT FOR FIRST DWELLING UNIT, PLUS 10 FT FOR EACH ADDITIONAL UNIT NEED NOT EXCEED 100 FT 2. SUBSTITUTIONS SHALL BE MADE ONLY WITH OWNER'S APPROVAL AND BE OF EQUIVALENT QUALITY TO
SCALE: 1"=50' WHAT IS SPECIFIED.
MIN. LOT AREA = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH ADDITIONAL DWELLING UNIT 3. WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH ALL LOCAL CODES AND OSHA SAFETY PROPOSED CONCRETE CURB
RULES AND REGULATIONS.
FRONT SETBACK = 40 FT 4. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT THE SITE. NOTIFY OWNER & ENGINEER OF
DISCREPANCIES IN CONDITIONS SHOWN ON DRAWINGS PRIOR TO PROCEEDING WITH THE WORK. DRAWING NAME:
1
SIDE SETBACK = 25 FT MIN. OR A DISTANCE EQUAL
2 HGT.
TO OF SUCH BUILDING, WHICHEVER IS GREATER PROPOSED SIDEWALK / CONCRETE PAD
5. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ANY EXISTING STRUCTURES TO REMAIN
REAR SETBACK = 30 FT or EQUAL TO THE HEIGHT OF THE BUILDING AND ANY FINISH MATERIAL INSTALLED WHILE WORKING ON OTHER COMPONENTS. Overall Site Plan
6. CONTRACTOR SHALL KEEP JOB FREE OF DEBRIS AND MAKE FINAL CLEANUP TO SATISFACTION OF NUMBER OF PARKING SPACES
MAXIMUM BUILDING HEIGHT = 40 FT (MULTI-FAMILY) OWNER. 27
7. CONTRACTOR SHALL ASCERTAIN THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION SO THAT
DRIVEWAY: 30 FT WIDE REQUIRED FOR MULTI-FAMILY THIS WORK WILL NOT DISTURB EXISTING LINES AND/OR INSTALLATIONS. COORDINATE ALL WORK WITHPROPOSED SIGN
THE APPLICABLE UTILITY COMPANIES.
DWELLING SIZE: 500 SF EACH MULTI-FAMILY UNIT 8. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS NECESSARY TO PERFORM THE
WORK. PROPOSED STANDARD DUTY
GROUP DWELLING: NO BUILDING SHALL BE NEARER TO ANY OTHER PRINCIPAL STRUCTURE THAN A DISTANCE EQUAL TO THE AVERAGE HEIGHT OF 9. ALL REASONABLE MEASURES SHALL BE TAKEN TO PROTECT EXISTING TREES WHICH ARE TO BE
SUCH BUILDINGS ASPHALT PAVEMENT Date: 5/22/26
PRESERVED FROM ALL POSSIBLE TYPES OF ROOT, TRUNK, AND LIMB DAMAGE; INCLUDING BUT NOT Drawn By: A. Pandolfe
LIMITED TO, RETAINING WALLS WHICH PREVENT FILLING ON TOP OF ROOTS OR EXCAVATING TREE
ROOTS. Scale: As Noted
PARKING CALCULATION: DENSITY CALCULATION (16.59 AC) PROPOSED LIGHT POLE
MULTI-FAMILY: DRAWING NO.
REQ'D = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH
REQ'D = 2 SPACES PER UNIT + 5/25 UNITS VISITORS ADDITIONAL DWELLING UNIT
C-100
NOTES:
REQ'D = 2 SPACES x 29 UNITS + (29/25 x645)SPACES
= NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
ALLOWED NUMBER OF UNITS: 1. ALL RADII SHALL BE 3'-0" UNLESS OTHERWISE NOTED. CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
TOTAL PROVIDED = 65 SPACES + 42 GARAGE SPACES
107 SPACES
= 1ST UNIT: 722,660 SF - 8,000 SF = 714,660 SF REMAINING 2. ALL DISTURBED AREAS: SHALL HAVE 4" MIN. OF TOPSOIL & SEED.
ADDITIONAL UNITS: 714,660 SF / 5,000 SF = 142 UNITS 3. ALL DIMENSIONS FROM PROPERTY LINES SHALL BE MEASURED PERPENDICULAR TO THE PROPERTY LINE. 50 0 50 100Ft.
4. CENTER ENTRANCE SIDEWALKS ON DOOR OPENINGS. 50' Project No: 23-4121
TOTAL ALLOWED UNITS = 143 UNITS 5. BUILDING DIMENSIONS ARE APPROXIMATE, REFER TO ARCHITECTURAL DRAWINGS FOR LAYOUT DIMENSIONS.
Page 734 of 1493
Page 735
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
UE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
G
UE
EX. PIN CB
W
RIM:683.34
APPROX. LOCATION
G
N. INV:672.94 (18")
ST
UE
S. INV:673.10 (18")
OE
SA
Utica
CB
W
2" RIM:680.53
G
53.0
3
8'-
UE
N. INV:671.23 (18")
EX 5A' N .
CB
3'
-5
OE
0°
ST W
5.2 S 2' E OE
0' S. INV:671.23 (18")
.N .
33.
Buffalo
10 RIM:685.39
0.3G
AI
N. INV:677.49 (18")
L
UE
3
62.9
87°-09'-45" S. INV:677.49 (16")
UE
3'
9
E. INV:676.99 (4")
W
LIMIT OF TREE CLEARING 3
20.0
STG
OR
UE
'
UE
R33'
SA
T MH
LO
OE
BAC
K T. RIM:685.89
BI
R55'
T
W
E
DE S
5.0
I
25' S NW. INV:676.14 (12")
3
CH
G
R25'
'
UE
R33' SA
9 5
SE. INV:676.22 (12")
30.0
25'
SI
'
DE
1.0
W
PP .
OE
SET
30.
2
AR
G
4A
0'
'E
20.0
7
UE
0'
24.
BAC
TYP.
R5'
ST
K
'
EX. REBAR
BU
4B 3
Multifamily Development
PRO ING .F.E.
1
ILD F
R25
PO W/A = 68
4.11' N. ' 3
W
SED TT 1.6
OE
D
0'
SA
20'x8.5' MAIL KIOSK
40.
G
R5'
UE
'
1-S ACH 0
0
21.
61.1
& BUS SHELTER TYP.
TO ED
3
R55'
4'
RY GA
3
4A
PA
2
5-U RAG
40.5
W
0' 2
NIT ES
113°-18'-53" 3
OE
20.
6'
4A
UE
3
G
24.
8
2
0'
SA
38.0' 3
RK
24.0'
6
21.
40'
SWT
3
OE
0'
0'
40.
FRO
UE
0' 2
G
2
3
30. 0'
BUILDING W/ATTACHED GARAGES
33.
NT
20.
EX. PIN
PROPOSED 1-STORY 4-UNIT
SET
0'
0'
9.0
21.0' 21.
RO
B
2
'
AC
SA GS
3
'
F.F.E. = 681.15
3 0 IT S
19.
OE
K
PP 8' E.
UN RAGE
1425 & 1475 Orchard Park Rd
W
1
UE
24.0' 4
0.
6
2 -
2 3 RY GA
' TO HED
T
5
5.0 S
24.
5 -
.0' 1 AC 80
BUILDING W/ATTACHED GARAGES
24 SED /ATT 684.
0'
AD
3 20.0' O
PROPOSED 1-STORY 4-UNIT
OP W =
PR ING .F.E.
1
OE
3
W
EX 9' N
UE
ILD F
4 3
SA
5.8 /L W G
20.0' BU
G
F.F.E. = 680.40
.R .
3 3 2
3
±OST E
30' REAR SETBACK
EB
6 3 STOP
© CARMINA WOOD DESIGN
6
2
(6
4A
AR
O
3
TY '
R5
P.
West Seneca, NY
1
UE
2 6
5.0'
4A 6
21.0'
24.0' .0'
6.0
9
SA
2
19.
4 3
3
R30'
1
9.0'
0'
UE
19.0'
ST
2
3 4 R1
2 5'
W
9
')
24.0'
OE
OE
PP
G
OE
5.0
2 3
OE
OE PP
'
OE 1.0' E.
SA
UE
'
OE
R20
3
32.19'
4A 1 OE
EX. IP.
30.0'
11
OE
R3 OE
WT
OE
S
OE
0'
5°
PP 7.27' NW.
R50'
0'
OE
-0
G
R2 3 ACK
SETB
4'- SA
38.0' DE PARKING
25' SI
47
STOP LOT
"
W
OE
OE
1
Date
G
ST
12" W
A
RE
OE
A
OE
W
LIMIT OF TREE CLEARING .
BIT
SA
3
12" 170°-37'-13"
OE
30.0' HYD
ST G E
APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF
O
W
OF CEMETERY CEMETERY AND NOTIFY DESIGN
ENGINEER OF ANY POTENTIAL CONFLICTS
STORM WATER MANAGEMENT AREA HEAD STONES NOT
SA
No. Description
LOCATED 127°-49'-44"
G
OE
4A
W
ST
REVISIONS:
14" 1
28"
14"
EX. IP.
W. INV: 682.97
(12" HDPE)
Site Plan - North
SCALE: 1"=30'
SITE DATA ( REZONED TO C-1 (S) ) - 1425 & 1475 ORCHARD PARK RD - 16.59 ACRES
MULTI-FAMILY ALLOWED BY SPECIAL PERMIT
MIN. LOT WIDTH = 50 FT FOR FIRST DWELLING UNIT, PLUS 10 FT FOR EACH ADDITIONAL UNIT NEED NOT EXCEED 100 FT
GENERAL NOTES:
MIN. LOT AREA = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH ADDITIONAL DWELLING UNIT
DETAIL LEGEND SEE SITE DETAIL SHEET NOTE LEGEND 1. INSTALL ALL MATERIALS TO MANUFACTURER'S RECOMMENDATIONS AND BEST STANDARDS OF TRADE SITE LEGEND
FRONT SETBACK = 40 FT INVOLVED.
1
SIDE SETBACK = 25 FT MIN. OR A DISTANCE EQUAL
2 HGT.
TO OF SUCH BUILDING, WHICHEVER IS GREATER 2. SUBSTITUTIONS SHALL BE MADE ONLY WITH OWNER'S APPROVAL AND BE OF EQUIVALENT QUALITY TO
REAR SETBACK = 30 FT or EQUAL TO THE HEIGHT OF THE BUILDING 1 CONCRETE SIDEWALK 1 INSTALL STOP SIGN - M.U.T.C.D. SIGN NO. R1-1B PROPERTY LINE
WHAT IS SPECIFIED.
2 90° PARKING STALL INSTALL "NO PARKING" SIGN, M.U.T.C.D. SIGN NO. P1-1C 3. WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH ALL LOCAL CODES AND OSHA SAFETY
MAXIMUM BUILDING HEIGHT = 40 FT (MULTI-FAMILY) 2 RULES AND REGULATIONS. PROPOSED CONCRETE CURB
3 STOP BAR 4. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT THE SITE. NOTIFY OWNER & ENGINEER OF
DRIVEWAY: 30 FT WIDE REQUIRED FOR MULTI-FAMILY 3 LANDSCAPED AREA - SEE LANDSCAPE PLAN, IF NO PLANTINGS, INSTALL TOPSOIL & SEED DISCREPANCIES IN CONDITIONS SHOWN ON DRAWINGS PRIOR TO PROCEEDING WITH THE WORK.
4A STANDARD DUTY ASPHALT DRAWING NAME:
5. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ANY EXISTING STRUCTURES TO REMAIN PROPOSED SIDEWALK / CONCRETE PAD
DWELLING SIZE: 500 SF EACH MULTI-FAMILY UNIT 4B EXTERIOR CONCRETE SLAB ON GRADE 4 1' WIDE WHITE PAVEMENT STRIPES @ 1' SPACING BETWEEN 4" WIDE WHITE CROSSWALK LINES AND ANY FINISH MATERIAL INSTALLED WHILE WORKING ON OTHER COMPONENTS.
6. CONTRACTOR SHALL KEEP JOB FREE OF DEBRIS AND MAKE FINAL CLEANUP TO SATISFACTION OF Site Plan - North
GROUP DWELLING: NO BUILDING SHALL BE NEARER TO ANY OTHER PRINCIPAL STRUCTURE THAN A DISTANCE EQUAL TO THE AVERAGE HEIGHT OF 5 HANDICAPPED PAVEMENT MARKINGS 5 RELOCATE EX. UTILITY POLE - COORDINATE WITH UTILITY COMPANY OWNER. NUMBER OF PARKING SPACES
SUCH BUILDINGS 7. CONTRACTOR SHALL ASCERTAIN THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION SO THAT 27
6 HANDICAPPED PARKING SIGN
THIS WORK WILL NOT DISTURB EXISTING LINES AND/OR INSTALLATIONS. COORDINATE ALL WORK WITH
6 TACTILE WARNING MAT
PARKING CALCULATION: DENSITY CALCULATION (16.59 AC) 7 LIGHT POLE FOUNDATION THE APPLICABLE UTILITY COMPANIES. PROPOSED SIGN
MULTI-FAMILY: 7 HOTBOX 8. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS NECESSARY TO PERFORM THE
REQ'D = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH 8 DUMPSTER ENCLOSURE WORK.
REQ'D = 2 SPACES PER UNIT + 5/25 UNITS VISITORS ADDITIONAL DWELLING UNIT 9. ALL REASONABLE MEASURES SHALL BE TAKEN TO PROTECT EXISTING TREES WHICH ARE TO BE PROPOSED STANDARD DUTY
9 WOODEN GUIDE RAIL PRESERVED FROM ALL POSSIBLE TYPES OF ROOT, TRUNK, AND LIMB DAMAGE; INCLUDING BUT NOT Date: 5/22/26
REQ'D = 2 SPACES x 29 UNITS + (29/25 x645)SPACES
= ASPHALT PAVEMENT
ALLOWED NUMBER OF UNITS: LIMITED TO, RETAINING WALLS WHICH PREVENT FILLING ON TOP OF ROOTS OR EXCAVATING TREE Drawn By: A. Pandolfe
TOTAL PROVIDED = 65 SPACES + 42 GARAGE SPACES
107 SPACES
= 1ST UNIT: 722,660 SF - 8,000 SF = 714,660 SF REMAINING ROOTS. Scale: As Noted
ADDITIONAL UNITS: 714,660 SF / 5,000 SF = 142 UNITS PROPOSED LIGHT POLE
DRAWING NO.
TOTAL ALLOWED UNITS = 143 UNITS NOTES:
1.
2.
3.
4.
ALL RADII SHALL BE 3'-0" UNLESS OTHERWISE NOTED.
ALL DISTURBED AREAS: SHALL HAVE 4" MIN. OF TOPSOIL & SEED.
ALL DIMENSIONS FROM PROPERTY LINES SHALL BE MEASURED PERPENDICULAR TO THE PROPERTY LINE.
CENTER ENTRANCE SIDEWALKS ON DOOR OPENINGS.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-101
5. BUILDING DIMENSIONS ARE APPROXIMATE, REFER TO ARCHITECTURAL DRAWINGS FOR LAYOUT DIMENSIONS. Project No: 23-4121
30'
Page 735 of 1493
Page 736
STOP
OE
1
UE
12"
A
RE
OE
LIMIT OF TREE CLEARING . A
BIT
UE
3
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
25' SIDE SETBACK 12" 170°-37'-13"
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
OE
Greensboro
30.0'
APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF
OF CEMETERY CEMETERY AND NOTIFY DESIGN
UE
ENGINEER OF ANY POTENTIAL CONFLICTS
STORM WATER MANAGEMENT AREA HEAD STONES NOT
LOCATED 127°-49'-44"
UE
4A
14" 1
28"
14"
Utica
UE
W. INV: 682.97
(12" HDPE)
Buffalo
UE
R8
0'
R5
0'
UE
30.0'
4A
3 PARKING
'
R15
R15
LOT
UE
'
4
UE
3 STOP 1
PART OF
3 3 97.18' 146°-28'-21"
L-11442, P-836
UE
Multifamily Development
24.0' 24.0'
2 2
UE
3 3
UE
21.0' 21.0'
2
UE
4A 2
BUILDING W/ATTACHED GARAGES
20.0' 20.0'
PROPOSED 1-STORY 6 UNIT
BUILDING W/ATTACHED GARAGES
149°-26'-50"
PROPOSED 1-STORY 6 UNIT
UE
F.F.E. = 682.80
1425 & 1475 Orchard Park Rd
F.F.E. = 682.80
30.0'
3 3 PARKING
UE
LOT
20.0' 20.0'
UE
© CARMINA WOOD DESIGN
SCRUB SHRUB WETLANDS (PSS) 2 2
West Seneca, NY
(APPROXIMATE LOCATION) 153°-18'-56"
21.0' 21.0'
UE
3 3
8"
UE
2 4A
2
24.0' 24.0'
UE
4B
3 3
UE
Date
UE
8
UE
8" 12" 11"
No. Description
6" 8" 12"
7"
REVISIONS:
6"
6" 6" 12"
13"
6"
25' SIDE SETBACK
133°-32'-58"
GENERAL NOTES:
SITE DATA ( REZONED TO C-1 (S) ) - 1425 & 1475 ORCHARD PARK RD - 16.59 ACRES
MULTI-FAMILY ALLOWED BY SPECIAL PERMIT Site Plan - South 1.
2.
INSTALL ALL MATERIALS TO MANUFACTURER'S RECOMMENDATIONS AND BEST STANDARDS OF TRADE SITE LEGEND
INVOLVED.
SUBSTITUTIONS SHALL BE MADE ONLY WITH OWNER'S APPROVAL AND BE OF EQUIVALENT QUALITY TOPROPERTY LINE
MIN. LOT WIDTH = 50 FT FOR FIRST DWELLING UNIT, PLUS 10 FT FOR EACH ADDITIONAL UNIT NEED NOT EXCEED 100 FT SCALE: 1"=30' WHAT IS SPECIFIED.
3. WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH ALL LOCAL CODES AND OSHA SAFETY
MIN. LOT AREA = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH ADDITIONAL DWELLING UNIT RULES AND REGULATIONS. PROPOSED CONCRETE CURB
4. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT THE SITE. NOTIFY OWNER & ENGINEER OF
FRONT SETBACK = 40 FT DISCREPANCIES IN CONDITIONS SHOWN ON DRAWINGS PRIOR TO PROCEEDING WITH THE WORK. DRAWING NAME:
1
SIDE SETBACK = 25 FT MIN. OR A DISTANCE EQUAL
2 HGT.
TO OF SUCH BUILDING, WHICHEVER IS GREATER DETAIL LEGEND SEE SITE DETAIL SHEET NOTE LEGEND 5. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ANY EXISTING STRUCTURES TO REMAIN PROPOSED SIDEWALK / CONCRETE PAD
REAR SETBACK = 30 FT or EQUAL TO THE HEIGHT OF THE BUILDING AND ANY FINISH MATERIAL INSTALLED WHILE WORKING ON OTHER COMPONENTS.
1 CONCRETE SIDEWALK INSTALL STOP SIGN - M.U.T.C.D. SIGN NO. R1-1B 6. CONTRACTOR SHALL KEEP JOB FREE OF DEBRIS AND MAKE FINAL CLEANUP TO SATISFACTION OF Site Plan - South
MAXIMUM BUILDING HEIGHT = 40 FT (MULTI-FAMILY) 1
OWNER. NUMBER OF PARKING SPACES
2 90° PARKING STALL 7. CONTRACTOR SHALL ASCERTAIN THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION SO THAT 27
2 INSTALL "NO PARKING" SIGN, M.U.T.C.D. SIGN NO. P1-1C
DRIVEWAY: 30 FT WIDE REQUIRED FOR MULTI-FAMILY THIS WORK WILL NOT DISTURB EXISTING LINES AND/OR INSTALLATIONS. COORDINATE ALL WORK WITH
3 STOP BAR
THE APPLICABLE UTILITY COMPANIES.
LANDSCAPED AREA - SEE LANDSCAPE PLAN, IF NO PLANTINGS, INSTALL TOPSOIL & SEED PROPOSED SIGN
DWELLING SIZE: 500 SF EACH MULTI-FAMILY UNIT 4A STANDARD DUTY ASPHALT 3 8. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS NECESSARY TO PERFORM THE
1' WIDE WHITE PAVEMENT STRIPES @ 1' SPACING BETWEEN 4" WIDE WHITE CROSSWALK LINES WORK.
GROUP DWELLING: NO BUILDING SHALL BE NEARER TO ANY OTHER PRINCIPAL STRUCTURE THAN A DISTANCE EQUAL TO THE AVERAGE HEIGHT OF 4B EXTERIOR CONCRETE SLAB ON GRADE 4 9. ALL REASONABLE MEASURES SHALL BE TAKEN TO PROTECT EXISTING TREES WHICH ARE TO BE PROPOSED STANDARD DUTY
SUCH BUILDINGS PRESERVED FROM ALL POSSIBLE TYPES OF ROOT, TRUNK, AND LIMB DAMAGE; INCLUDING BUT NOT ASPHALT PAVEMENT Date: 5/22/26
5 HANDICAPPED PAVEMENT MARKINGS 5 RELOCATE EX. UTILITY POLE - COORDINATE WITH UTILITY COMPANY LIMITED TO, RETAINING WALLS WHICH PREVENT FILLING ON TOP OF ROOTS OR EXCAVATING TREE Drawn By: A. Pandolfe
6 HANDICAPPED PARKING SIGN ROOTS. Scale: As Noted
PARKING CALCULATION: DENSITY CALCULATION (16.59 AC) TACTILE WARNING MAT
6 PROPOSED LIGHT POLE
MULTI-FAMILY: 7 LIGHT POLE FOUNDATION DRAWING NO.
REQ'D = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH
REQ'D = 2 SPACES PER UNIT + 5/25 UNITS VISITORS ADDITIONAL DWELLING UNIT 7 HOTBOX NOTES:
8 DUMPSTER ENCLOSURE
REQ'D = 2 SPACES x 29 UNITS + (29/25 x645)SPACES
=
TOTAL PROVIDED = 65 SPACES + 42 GARAGE SPACES
107 SPACES
=
ALLOWED NUMBER OF UNITS:
1ST UNIT: 722,660 SF - 8,000 SF = 714,660 SF REMAINING
ADDITIONAL UNITS: 714,660 SF / 5,000 SF = 142 UNITS
9 WOODEN GUIDE RAIL 1.
2.
3.
4.
ALL RADII SHALL BE 3'-0" UNLESS OTHERWISE NOTED.
ALL DISTURBED AREAS: SHALL HAVE 4" MIN. OF TOPSOIL & SEED.
ALL DIMENSIONS FROM PROPERTY LINES SHALL BE MEASURED PERPENDICULAR TO THE PROPERTY LINE.
CENTER ENTRANCE SIDEWALKS ON DOOR OPENINGS.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-102
Project No: 23-4121
TOTAL ALLOWED UNITS = 143 UNITS 5. BUILDING DIMENSIONS ARE APPROXIMATE, REFER TO ARCHITECTURAL DRAWINGS FOR LAYOUT DIMENSIONS.
30'
Page 736 of 1493
Page 737
12" X 18" RED ON WHITE (M.U.T.C.D. SIGN NO. R7-1),
PAVEMENT WIDTH VARIES SEE SITE PLAN 7' ABOVE GRADE, MOUNT ON 2"Ø PIPE
TRAFFIC YELLOW 4" WIDE
NEW CONCRETE (MIN. 3,500 PSI) PAINTED LINE (TYP) EDGE OF PVMT. 1.5" ASPHALT TOP COURSE, TYPE 7 NO FACING PARKING AISLE (MAY BE BUILDING
SIDEWALK - 4" MIN. THK. (N.Y.S.D.O.T. ITEM 403.18) PARKING MOUNTED, SEE SITE PLAN) FOR INSTALLATION IN
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
DRIVEWAY - 6" MIN THK. W/W.W.F.6X6/10X10 ANY PAVEMENT, SEE HANDICAPPED PARKING SIGN DETAIL.
EXPANSION JOINT 2.5" ASPHALT BINDER COURSE, TYPE 3
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
TIME
Greensboro
1/2" RECESS GRASS AREA (N.Y.S.D.O.T. ITEM 403.13)
SEE PLAN
SLOPE 8" SUBBASE COURSE MATERIAL, TYPE 1 NO PARKING SIGN (SEE DETAIL), LOCATE
EXISTING SIDEWALK CURB LANDSCAPED AREA AS SHOWN ON SITE PLAN
1/4" / FT. (N.Y.S.D.O.T. ITEM 304.02)
HANDICAPPED PARKING
PAVEMENT 9'-0" 9'-0" 9'-0" 9'-0" SIGN (SEE DETAIL)
19'
EDGE OF PAVEMENT
EDGE OF PVMT.
19'
NONWOVEN GEOTEXTILE FABRIC
MIRAFI 600X OR APPROVED EQUAL (IF
FORM SUBBASE WARRANTED BY SITE CONDITIONS
STONE SUBBASE MATERIAL TYPE 2 (N.Y.S.D.O.T. ITEM DURING CONSTRUCTION)
Utica
CROSS SECTION TRAFFIC YELLOW 4" WIDE
19'-0' (TYP)
304.12)
MIN. 4" THICK (SIDEWALK) GRADED AND COMPACTED PAVEMENT SUBGRADE PAINTED LINE (TYP)
SEE PLAN 9'-0" 9'-0" MIN. 9'-0"
MIN. 6" THICK (DRIVEWAY) NOTE: CONSTRUCTION METHODS FOR ASPHALT PAVEMENT SHALL
NOTES: CONFORM TO NYSDOT STANDARD SPECIFICATION 401-3, WITH INTERNATIONAL
1. CONTROL JOINTS TO BE AT 5'-0" O.C., BOTH WAYS WHERE APPLICABLE. SEE SPECIFICATIONS FOR FURTHER JOINT HANDICAP SYMBOL - 5A
Buffalo
SUBBASE CONSTRUCTION METHODS CONFORMING TO NYSDOT
REQUIREMENTS NYSDOT 702-0700. 90° PARKING STALL LAYOUT - 2 STANDARD SPECIFICATION 304-3.
24" (TYP)
2. CONCRETE SIDEWALK AND DRIVEWAY MATERIAL SHALL CONFORM TO NYSDOT STANDARD SPECIFICATION 501 AND 2'-0" (TYP) 45° (TYP)
CONSTRUCTION METHODS SHALL CONFORM TO NYSDOT STANDARD SPECIFICATION 608-3. STANDARD DUTY ASPHALT SECTION - 4A
3. SUBBASE GRADE SHALL FOLLOW THE PROPOSED GRADE OF THE SIDEWALK AND SLOPE AWAY FROM BUILDING WHERE
APPLICABLE, PROVIDE CONTINUOUS STONE PATH TO CURB UNDERDRAIN WHERE PROVIDED. HANDICAPPED PAVEMENT MARKINGS & SIGNAGE - 5
4. FULL DEPTH EXPANSION JOINTS SHALL BE INSTALLED EVERY 20' O.C., BOTHWAYS WHERE APPLICABLE. SEE
SPECIFICATIONS FOR FURTHER JOINT REQUIREMENTS NYSDOT 702-0700.
SEE
TRAFFIC REFLECTIVE PLAN
5. SEE CURB DETAIL FOR DOWLING REQUIREMENTS WHERE ABUTTING CURB.
WHITE PAINT 2'-0" PAVEMENT WIDTH VARIES SEE SITE PLAN WHITE REFLECTIVE
STOP SIGN - M.U.T.C.D. SIGN NO. R1-1 PAINT
6. INSTALL 6" LONG #3 DOWELS @ 12" O.C. WHERE SIDEWALK ABUTS A BUILDING WALL AT AN ENTRANCE, THICKEN SIDEWALK
TO 6" AT BUILDING WALL AND INSTALL DOWEL CENTERED IN THE 6" DEPTH. DOWELS AND THICKENING OF SIDEWALK 6" CONCRETE SLAB (MIN. 4,000 PSI)
SHALL EXTEND 18" EITHER SIDE OF ENTRANCE. 4'-0" CONTROL JOINTS @ 10' O.C. BOTH WAYS. SEAL ALL JOINTS
1'-6" 2'-0" WITH ASPHALT CEMENT, NYSDOT SPECIFICATIONS 702-0700
CENTER LINE TWO LANE PAVEMENT
SAFETY BLUE
Multifamily Development
7. INSTALL 1/2" PREMOLDED EXPANSION JOINT WITH BACKER ROD & SEALANT WHERE SIDEWALK ABUTS BUILDING OR OTHER STOP BAR BACKGROUND
STRUCTURE.
STOP 6"x6" 10/10 WELDED WIRE FABRIC (3" BELOW TOP OF SLAB)
8'-0"
X X X X X X X
42"
FACE OF CURB OR
5" SUBBASE COURSE
CONCRETE SIDEWALK - 1 EDGE OF PAVEMENT,
SEE PLAN MATERIAL, TYPE 1
(NYSDOT ITEM 304.02)
51/2" 1'-8"
GRADED AND COMPACTED PAVEMENT SUBGRADE
(TYP)
8'-5"
CENTERED IN LANE NOTE: CONCRETE PAVEMENT MATERIAL SHALL CONFORM TO NYSDOT
SEE PLAN STANDARD SPECIFICATION 501 AND CONSTRUCTION METHODS
SHALL CONFORM TO NYSDOT STANDARD SPECIFICATION 502-3. 42"
STOP BAR DETAIL - 3 EXTERIOR CONCRETE SYMBOL TO BE CENTERED IN PARKING SPACE
SLAB-ON-GRADE SECTION - 4B
1425 & 1475 Orchard Park Rd
INTERNATIONAL HANDICAP
12'-0"
CENTER TO CENTER SYMBOL - 5A
6'-0" 4" DIAMETER GALVANIZED STEEL GATE POST (TYP.
3" DIAMETER GALVANIZED STEEL TYP. EACH SIDE)
POST (TYP.)
© CARMINA WOOD DESIGN
1' x 1' CHAMFER (TYP. EACH SIDE)
24'-0"
West Seneca, NY
FENCE GATE POST 4"Ø STANDARD WEIGHT, HANDICAPPED PARKING SIGN
CENTER TO CENTER M.U.T.C.D. SIGN NO. P4-6C
SCH. 40, HOT DIPPED GALVANIZED W/ MIN.
TYP.
6'-0"
1.8 OZ/SF OF ZINC (TYP.)
11'-0" RESERVED
EDGE OF CONCRETE OPENING - FACE TO FACE PARKING
DOUBLE GATE
LATCH 4"
FENCE GATE POST (TYP.)
CENTER TO CENTER
24'-0"
DUMPSTER ON CONC. PAD,
DOUBLE GATE - CHAIN LINK FENCE
SEE SITE PLAN W/VINYL SCREENING STRIPS AND DROP
ROD
2" SQR. GALVANIZED PUNCH TUBE
6'-0"
7'-0"
Date
SLEEVE FOR 3/4" DROP ROD,
AT GRADE WITH CONCRETE, 1 1/2" RECESS
PROVIDE 1 FOR EACH SIDE OF GATE
(TYP. BOTH SIDES)
GRADE
DOUBLE GATE - CHAIN LINK FENCE W/VINYL
SCREENING STRIPS AND DROP ROD (120° SWING 6"
6"
MIN.) DROP ROD 9" 9" TOP OF CONCRETE
(TYP. OF 2)
3'-6" MIN.
GATE FRAME CHAIN LINK FENCE GATE NOTES:
6' HIGH BOARD ALL WELDED JOINTS TO 3,500 PSI CONCRETE
6" Ø PIPE BOLLARD SET IN CONCRETE 3' BELOW GRADE, EXTEND
FENCE, SEE DETAIL MAKE SOLID FRAME 1. GATE POST FOOTINGS TO BE MIN. 36" DEEP x (4x) POST DIAMETER, EXTEND POST TO WITHIN 6" OF BOTTOM. 1'-6" DIA. CONCRETE BASE
No. Description
4' ABOVE GRADE, FILL W/CONCRETE, PAINT OSHA YELLOW (TYP.
OF 6)
3' WIDE CHAIN LINK FENCE GATE & FRAME WITH VINYL SCREENING STRIPS, 2. GATE FRAMES TO BE 2" SQ. GALVANIZED STEEL, WEIGHING 2.60 LB/FT IN ACCORDANCE WITH ASTM F 900.
REVISIONS:
5' WIDE SIDEWALK TO GATE TO HAVE LATCHING MECHANISM TO KEEP CLOSED WHEN NOT BEING FRONT VIEW
PLAN VIEW ACCESS GATE, EXTEND TO 3. CHAIN LINK FENCE FABRIC SHALL BE 2" MESH, 9 GAUGE, ZINC COATED STEEL CORE WIRE. INSTALL MESH WITH HOOK BOLTS
ACCESSED 2" 1'-6"
ASPHALT DRIVE AND TENSION BARS ON ALL 4 SIDES, ATTACH AT 15" MAX.
4. DOUBLE GATE LATCH TO BE FORKED TYPE CAPABLE OF RETAINING GATE IN CLOSED POSITION AND HAVE PROVISION FOR PAD NOTES:
DUMPSTER ENCLOSURE - 8 LOCK. LATCH SHALL BE OPERABLE FROM EITHER SIDE OF GATE.
1. HANDICAPPED PARKING SIGN SHALL CONFORM WITH
CURRENT STATE AND LOCAL CODES AND REGULATIONS.
5. ALL HARDWARE TO BE HOT DIPPED GALVANIZED STEEL TO SUIT GATE SIZE.
HANDICAP PARKING SIGNS - 6
INSTALLED IN GRASS/LANDSCAPED AREA
A FIXTURE FURNISHED,
INSTALLED AND WIRED BY ELECTRICAL
CONTRACTOR.
1" X 6" BOARD 1"
TYP.
2" X 6" TOP RAILS
ELECTRICAL CONTRACTOR FURNISHED POLE 8"
3-20# NAILS ATTACHED 4"x6" GASKET HAND HOLE 13" x 5/8 " GALVANIZED CARRIAGE BOLT,
TO RAIL POST (EACH SIDE) ELECT. CONTRACTOR TO WASHER & NUT COUNTERSUNK (TYP.)
CONNECT OR CADWELD FURNISHED AND INSTALL IN-LINE PRESSURE TREATED PINE
GROUND WIRE TO BALLAST FUSES IN BUSSMANN LENGTHS: INTERMEDIATE
5'-6" (6' HIGH FENCE)
3" Ø GALVANIZED STEEL POST,
8"
"TRON" WEATHERPROOF FUSE SPANS - 8'-0", END
8'-0" O.C. 12' LONG (8' HIGH FENCE) 1"x45° CHAMFER SPANS - 8'-3"
8'-0" O.C. 10' LONG (6' HIGH FENCE) HOLDERS #HEB-AD WITH #KTK
ROUND FORMED CONCRETE FUSES (SIZE AS REQUIRED)
BASE 30" DIAMETER
6'-0"
4 - 40"x1"Ø ANCHOR BOLTS 8'-0" O.C. (TYP.)
2" X 6" CENTER RAILS
#3 REINFORCING TIES
12" ON CENTER 4"
SEE NOTE
1" 3"
1"
5"
2" X 6" BOTTOM RAILS FINISHED GRADE
10"
#6 BARE GROUND WIRE
12" DIA. HOLE, FILL WITH 3,000 PSI CADWELD CONNECTION DRAWING NAME:
3'-0" MIN.
(BOTH ENDS)
6'-6" MIN.
2'-6"
CONC.
8'-0" MIN. AND DOWN
3/4 "x10" COPPER WELD 3" x 10" ROUGH SAWN Site Details
6"
GRADE
TO SOLID BEARING
GROUND ROD (LIGHTING FACE ALL SIDES GRADE
PROTECTION)
CARLON PLASTIC CONDUIT
2'-0" GRAVEL FILL GALVANIZED STEEL TO CARLON
4'-0" MIN.
3" COVER
CONDUIT CONNECTOR
END POST
4'-0"
NOTES:
GALVANIZED CONDUIT "ELL"
6"
1. ALL WOODEN FENCE MATERIAL TO BE PRESSURE TREATED PINE.
2. CENTER, BOTTOM AND TOP RAILS TO BE FASTENED TO 3" Ø GALVANIZED 4 - #8 VERTICAL INTERMEDIATE POST
STEEL FENCE POSTS USING SIMPSON PIPE GRIP TIES OR EQUAL. ALL REINF. BARS
ALL CONCRETE WORK AND Date: 5/22/26
6"
HARDWARE TO BE GALVANIZED. REINFORCING SHALL BE 24" DIA.
3. ATTACH EACH 1" X 6" BOARD TO RAILS USING (3) GALVANIZED NAILS AT BY SITE CONTRACTOR CONCRETE 3,000 PSI CONCRETE Drawn By: A. Pandolfe
EACH RAIL LOCATION. BASE 1-6" DIA. 8" x 8" ACTUAL POSTS ROUGH FOUNDATION (TYP.) Scale: As Noted
4. WOOD POSTS CAN BE SUBSTITUTED FOR STEEL. NOTES: SAWN FACE ALL SIDES, 1"
1. FOR LOCATIONS OF FOUNDATIONS SEE SITE PLAN CHAMFER TOP AND SIDES, DRAWING NO.
2. FOR LIGHT FIXTURE ORDERING INFORMATION SEE SITE LIGHTING PLAN PRESSURE TREATED PINE
SECTION A-A
C-103
3. LIGHT POLE BASE EXPOSURE ABOVE GRADE SHALL BE:
A IN CURBED ISLANDS: 6" ABOVE TOP OF CURB ELEVATION
IN PAVEMENT: 3' ABOVE GRADE DECORATIVE WOODEN GUIDE RAIL - 9
IN NON-CURBED GRASS AREAS: 6" ABOVE GRADE
BOARD ON BOARD FENCE - FOR DUMPSTER ENCLOSURE
LIGHT POLE FOUNDATION - 7 Project No: 23-4121
Page 737 of 1493
Page 738
UE
EX. PIN CB
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
UE
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
RIM:683.34
G
APPROX. LOCATION
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
W
Greensboro
N. INV:672.94 (18")
ST
S. INV:673.10 (18")
SA
CB
OE
2" RIM:680.53
UE
8 '-3 N. INV:671.23 (18")
EX 5' N .ST
CB
°-5
G
5.2 32' E OE
0 S. INV:671.23 (18")
.N .
10 RIM:685.39
0W.
AI
678 N. INV:677.49 (18")
L
676 677 87°-09'-45"
679 S. INV:677.49 (16")
680 81
E. INV:676.99 (4")
UE
6
SA G
UE
OR
T MH
Utica
LO
W
T. RIM:685.89
BI
UE
NW. INV:676.14 (12")
CH
681
SE. INV:676.22 (12")
UE
1 .0
683
PP . 684
G OE
AR
SW
SA
'E
Buffalo
T
UE
EX. REBAR
BU
PRO ING .F.E.
680
684
ILD F
2
PO W/A = 68
4.11' N. 671 67
SED TT 1.6
4
673 67
D
N
UE
6
675 67
O
1-S ACH 0
8
682
677 67
TI
TO ED
UE
679
CA
RY GA
G E
PA
5-U RAG
LO
O
W
NIT ES
113°-18'-53"
9
67
X.
RO
SA S
RK
P
UE
UE
AP
680
T
680
BUILDING W/ATTACHED GARAGES
GE
EX. PIN
PROPOSED 1-STORY 4-UNIT
O
W
RO
F.F.E. = 681.15
IT S
UE
685
681
PP 8' E.SA GSW
UN GE
-4 RA
0.
RY D GA
UE
684
O
686
T E
1-S CH 0
687
BUILDING W/ATTACHED GARAGES
ED TA .8
OS W/AT = 684
A
PROPOSED 1-STORY 4-UNIT
O P
684 PR ING .F.E.
EX 9 ' N
ILD F
OE
UE
D
5.8 /L
BU
F.F.E. = 680.40
.R .
T
683
±O
EB
STOP
679
(6
AR
UE
681
UE
6.0
688
Multifamily Development
9
68
682 684
SA SOE
')
OE
UE
UE
PP
G
T
OE PP
OE 1.0' E.
OE
W
OE EX. IP.
14
11
680
681 OE 687 688 689
3.8
0
5°
PP 7.27' NW.
68
NW. COR. LOT 417
-0
6'
UE
684 685
4'- SA W
PARKING
OE
MS
686
47
STOP LOT
OE
.
S. LINE LOT 369 679
"
G
678
677
W
ST
12" 682
UE
670
EX. IP. 671
672 EA
OE
R
673 .A
N. INV: 660.98 (18" HDPE)
674
675 BIT
675 12" 170°-37'-13"
OE
89°-57'-36" 674
673
672 APPROX. LOCATION HYD
671 CONTRACTOR TO VERIFY LIMITS OF
WG
670 OF CEMETERY CEMETERY AND NOTIFY DESIGN
SA S
UE
ENGINEER OF ANY POTENTIAL CONFLICTS
HEAD STONES NOT
LOCATED
T OE
673
1425 & 1475 Orchard Park Rd
127°-49'-44"
673
14"
28"
14"
UE
EX. IP.
W. INV: 682.97
(12" HDPE)
ST
675 682
674 677
678
23"
UE
COM
676
© CARMINA WOOD DESIGN
12"
9 PARKING
West Seneca, NY
S. INV: 662.31 (18" HDPE) 67 680 68
1
LOT
UE
685 684
686
683
EX. IP.
.
O/L STOP 682
PART OF &
MS
146°-28'-21" D.
W. LINE LOT 417
1'
UE
68
1 L-11442, P-836 29
9.7
679
UE
680
682
681
38"
682
682
UE
BUILDING W/ATTACHED GARAGES
EXCEPTION
COM
30"
PROPOSED 1-STORY 6 UNIT
BUILDING W/ATTACHED GARAGES
149°-26'-50"
L-3327
PROPOSED 1-STORY 6 UNIT
11"
F.F.E. = 682.80
F.F.E. = 682.80
10 24" EX. IP. P-87
Date
682
PARKING 3. 2.04' NW.
UE
LOT 00
'D
.&
M
S.
682
SCRUB SHRUB WETLANDS (PSS) 36"
33
UE
(APPROXIMATE LOCATION) 153°-18'-56" 8.
"
14" 0'
10
D.
6'-
&
°-4
24" M
S.
89
8"
UE
S.
113°-43'-57"
'M
18"
No. Description
00
3.
682
11
UE
COM
REVISIONS:
5" 682
T
ND
RA
.B
UE
683
NE
684
EX. REBAR
685
LI
S.
686
687
N.
M
688
EXCEPTION
.&
'D
8" 12" 11"
O/L
L-3036
70
2.
12" 6" 8" 12"
26
7" P-217
20" 6"
& 89'
S.
6" 12"
D. 72.
M
6" 13"
6"
0')
EX. IP.
133°-32'-58"
0.
12.33' W.
(7
COM
EX. IP.
3.20' S.
275.56' D. & MS.
AD
87°-23'-54"
RO
20"
N. INV: 669.78 (18" HDPE)
RG
PROPOSED GRADING LEGEND
BE
PROPOSED CONTOUR 101
Overall Grading Plan PROPOSED SPOT ELEVATION 100.80
SCALE: 1"=50' TW 100.50 DRAWING NAME:
PROPOSED TOP/BOTTOM OF WALL ELEV.
BW 100.00 Overall Grading Plan
PROPOSED CATCH BASIN CB
PAVEMENT/GROUND SLOPE
PROPOSED YARD DRAIN YD
Date: 5/22/26
Drawn By: A. Pandolfe
PROPOSED MANHOLE MH Scale: As Noted
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
50 0 50 100Ft.
C-200
50' Project No: 23-4121
Page 738 of 1493
Page 739
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
UE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
G
UE
EX. PIN CB
W
RIM:683.34
APPROX. LOCATION
G
N. INV:672.94 (18")
ST
UE
S. INV:673.10 (18")
Utica
OE
SA
CB
W
2" RIM:680.53
G
-' 3
UE
8 N. INV:671.23 (18")
EX 5A' N .
-5 CB
OE
°
ST W
5.2 S32' E OE
Buffalo
0 S. INV:671.23 (18")
.N .
10 RIM:685.39
0. G
AI
678 N. INV:677.49 (18")
L
677
UE
676 679 0
YD 4 87°-09'-45" 683.55 S. INV:677.49 (16")
UE
68 RIM 680.20 683.0±
681 MATCH EX. E. INV:676.99 (4")
W
STG
OR
UE
679.95
UE
SA
679.20 681.10 OT 683.7± MH
OE
L
PATIO IT. MATCH EX. RIM:685.89
W
CB 6 B %
681.60 683.60 2.3 NW. INV:676.14 (12")
CH
G
RIM 679.00
681
UE
679.75 % 684.00
681.10 1.5 SE. INV:676.22 (12")
1.2% 683.45 684.5±
SA
% MATCH EX.
679.70 1.3% 3.9
1.0
W
683
PP .684
OE
679.95 679.20
AR
680.90
G
'E
.3% 684.50
UE
3 684.25 CB 1
ST
RIM 683.25
Multifamily Development
EX. REBAR
BU
PRO ING F.E.
680
1.2% 684
ILD F.
2
PO W/A = 68
4.11' N. 671 67 684.10
W
4
SED TT 1.6
OE
673 67
D
681.10
SA
6 683.45
G
675 67
UE
%
1-S ACH 0
8
3.0
682
677 67 683.45
TO ED
679 680.65 679.90
RY GA
PATIO F.F.E. = 683.70 %
PA
1.3
5-U RAG
681.60 YD 5
W
NIT ES
113°-18'-53"
OE
%
9
% 683.90
3.1 1.3
67
1.2
2.5
RIM 680.20
UE
G
679.00 CB 7 4.7%
%
%
680.65 PATIO
1.9
SA
RIM 678.80 681.15 680.55 684.00
%
RK
680.20
1.3
%
% 684.20
684.30
SWT
OE
1.3 CB 2
1.4
680
679.90
UE
680 680.25
%
G
CB 5 PATIO RIM 683.25
BUILDING W/ATTACHED GARAGES
RIM 679.80 681.60 EX. PIN 683.85 684.30
PROPOSED 1-STORY 4-UNIT
1.9
2.1% 680.65 % 681.10
2.8
%
RO
4.2%
SA GS
F.F.E. = 681.15
1425 & 1475 Orchard Park Rd
679.90
1.2%
PATIO 680.35 % 684.30 UNIT GES
685
OE
681
PP 8' E.
1.2
W
681.10
-4 RA
UE
680.40 679.30
0.
1.5% %
680.65 1.3 RY D GA
684
% 683.65 O
1.5
686
2.3
T E
T
1-S TACH .80 PATIO
687
BUILDING W/ATTACHED GARAGES
1.2% 680.25
%
% E D
1.3 683.35 OS AT 684
A
4.3% 684.80
OP G W/ E. =
2.5
YD 7
PROPOSED 1-STORY 4-UNIT
684
OE
R
%
P IN .F.
W
EX 9' N
RIM 680.00 683.20
UE
% ILD F
1.2
D
680.80
SA
684.30
5.8 /L W G
680.60 684.10 BU
1.3
G
F.F.E. = 680.40
2.3%
.R .
683
±OST E
%
YD 6 PATIO 684.10
683.00
EB
STOP
© CARMINA WOOD DESIGN
680.70 RIM 680.20 684.80
679
679.90 YD 1
(6
West Seneca, NY
AR
O
PATIO
681
684.30 RIM 683.70
UE
CB 8 4.7% 680.65 681.15 680.45 680.95
2.9% RIM 678.80 682.65 684.20 YD 2
6
1.2
682.35 RIM 683.70 9
688
SA
68
%
683.40
1.2%
.0'
680.35 680.85 682.00 682 684
1.2%
680.65 CB 3
UE
ST
RIM 682.15
681.20
W
PATIO 2.2%
1.5
OE
OE
)
680.40 683.50 PP
%
G
OE
679.90 PP
1.3
684.10 OE
1.5% OE
1.2%
1.0' E.
%
681.50 OE
SA
UE
1.2% 680.55 OE
679.55 CB 4 OE
OE
EX. IP.
11
680
1.2% 1.2% 682.75 OE
RIM 679.90 689
WST
BIORETENTION AREA #1 681 OE 687 688
OE
0
5°
PP 7.27' NW.
68
2,855 S.F. 679.90 679.35 681.90 682.85
OE
680.35 681.50
-0
G
679.55 680.10 682.35
(2,850 S.F. REQUIRED) 684 685
4'- SA
TOP ELEV = 673.50 STM MH 1 680.55 682.10 PARKING
686
47
BOTTOM ELEV = 673.00
679
RIM 679.20
STOP YD 3 LOT
"
W
YD 12-15 (TYP.)
OE
OE
678 RIM 684.00
Date
RIM 673.50 677
G
ST
12" 682 W
A
RE
OE
A
OE
673
W
.
674
BIT
SA
675
12" 170°-37'-13"
OE
HYD
ST G E
APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF
O
W
OF CEMETERY CEMETERY AND NOTIFY DESIGN 682.70
ENGINEER OF ANY POTENTIAL CONFLICTS CB 12
HEAD STONES NOT
1.2%
682.90 RIM 682.90
No. Description
END SECTION
SA
673 INV 673.00 LOCATED 127°-49'-44"
G
OE
REVISIONS:
1.5%
W
673
ST
14" 682.90
YD 16-18 (TYP.) 28"
RIM 673.50 683.10
14"
END SECTION EX. IP.
INV 673.00 W. INV: 682.97
678.20 678.95 (12" HDPE)
675 682
674 677 679.70 681.30
678
END SECTION
INV 669.57
STM MH 2
676
CB 11 1.5% 1.2% CB 10 1.5% 681.10 RIM 683.00
POND 675.30 RIM 678.00 RIM 679.50
678.75
9 PARKING
678.20 678.40 678.95 67 679.88 680 68
1 681.30
BIORETENTION AREA #2 679.15 LOT
1,700 S.F.
684
686
Grading Plan - North
PROPOSED GRADING LEGEND
SCALE: 1"=30'
PROPOSED CONTOUR 101
PROPOSED SPOT ELEVATION 100.80
TW 100.50 DRAWING NAME:
PROPOSED TOP/BOTTOM OF WALL ELEV.
BW 100.00 Grading Plan - North
PROPOSED CATCH BASIN CB
PAVEMENT/GROUND SLOPE
PROPOSED YARD DRAIN YD
Date: 5/22/26
Drawn By: A. Pandolfe
PROPOSED MANHOLE MH Scale: As Noted
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-201
Project No: 23-4121
30'
Page 739 of 1493
Page 740
679.55 CB 4 OE
OE
680
1.2% 1.2% RIM 679.90 682.75 OE
BIORETENTION AREA #1 681 688
UE
OE 687
0
PP
68
2,855 S.F. 679.90 679.35 681.90 682.85
OE
679.55 680.35 681.50 682.35
(2,850 S.F. REQUIRED) 680.10 684 685
TOP ELEV = 673.50 STM MH 1 680.55 682.10
686
UE
YD 12-15 (TYP.)
BOTTOM ELEV = 673.00
679
RIM 679.20
STOP YD 3
OE
678 RIM 684.00
RIM 673.50 677
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
UE
670 12" 682
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
671
EA
Greensboro
OE
672
673 . AR
674
BI T
UE
675
674
675 12" 170°-37'-13"
OE
673
672 APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF
671
670 OF CEMETERY CEMETERY AND NOTIFY DESIGN 682.70
UE
END SECTION ENGINEER OF ANY POTENTIAL CONFLICTS CB 12
HEAD STONES NOT
1.2%
INV 668.80 END SECTION 682.90 RIM 682.90
END SECTION
Utica
INV 669.00 END SECTION 673 INV 673.00 LOCATED 127°-49'-44"
INV 669.57
UE
1.5%
673 682.90
YD 16-18 (TYP.)
14"
28"
RIM 673.50 683.10
14"
Buffalo
END SECTION
UE
INV 673.00 W. INV: 682.97
678.20 678.95 (12" HDPE)
682
UE
OUTLET 674 675 677
678 679.70 681.30
STRUCTURE END SECTION
RIM 674.80 INV 669.57
STM MH 2
UE
676
10' WIDE EMERGENCY CB 11 681.10
TOP OF 1.5% 1.2% CB 10 1.5% RIM 683.00
SPILLWAY ELEV. 674.80 RIM 678.00
POND 675.30 RIM 679.50
LINE WITH LIGHT STONE FILL 678.75
9 PARKING
RIP RAP FLUSH WITH SPILLWAY 678.20 678.40 678.95 67 679.88 680 68
1 681.30
BIORETENTION AREA #2 679.15 LOT
UE
1,700 S.F.
685 684
686
(1,620 S.F. REQUIRED)
683
TOP ELEV = 673.50
BOTTOM ELEV = 673.00 681.50
UE
STOP
Multifamily Development
682
END SECTION
INV 675.00 146°-28'-21"
PART OF
682.30
L-11442, P-836
2.5%
68 682.30
UE
1
3.6% 3.6%
682.30 680.90 682.30
679
PATIO PATIO
UE
682.80 2.9% 2.9% 682.80
682.10
680
UE
2.6% 2.6%
682
681
682.30 682.30
682
UE
682
1425 & 1475 Orchard Park Rd
BUILDING W/ATTACHED GARAGES
PROPOSED 1-STORY 6 UNIT
1.7% 1.7%
BUILDING W/ATTACHED GARAGES
YD 8 149°-26'-50"
PROPOSED 1-STORY 6 UNIT
RIM 681.90
UE
F.F.E. = 682.80
1.2%
F.F.E. = 682.80
PATIO 682.10 682.10 PATIO 682.10
682
682.80 682.80 PARKING
UE
1.3%
681.90 LOT
© CARMINA WOOD DESIGN
West Seneca, NY
1.8% 1.8%
682
UE
SCRUB SHRUB WETLANDS (PSS) 682.30 682.30 YD 9
(APPROXIMATE LOCATION) RIM 681.90 153°-18'-56"
2.7% 2.7%
UE
8"
CB 9
UE
PATIO RIM 681.00
3.3% 3.3% PATIO
682.80 682.30 682.30 682.80
UE
682.10
682.30 YD 11 682.30
Date
682
RIM 681.70
UE
682
682.10 682.10 YD 10
1.2%
RIM 681.90
UE
683
684
685
UE
686
687
No. Description
681.60 688
12"
REVISIONS:
8" 11"
6" 8" 12"
7"
6"
6" 6" 12"
13"
6"
133°-32'-58"
PROPOSED GRADING LEGEND
PROPOSED CONTOUR 101
PROPOSED SPOT ELEVATION 100.80
Grading Plan - South PROPOSED TOP/BOTTOM OF WALL ELEV.
TW 100.50
BW 100.00
DRAWING NAME:
SCALE: 1"=30' Grading Plan - South
PROPOSED CATCH BASIN CB
PAVEMENT/GROUND SLOPE
PROPOSED YARD DRAIN YD
Date: 5/22/26
Drawn By: A. Pandolfe
PROPOSED MANHOLE MH Scale: As Noted
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-202
Project No: 23-4121
30'
Page 740 of 1493
Page 741
EX. PIN CB
UE
RIM:683.34
G
APPROX. LOCATION
W
N. INV:672.94 (18")
ST
S. INV:673.10 (18")
SA
CB
OE
2" RIM:680.53
UE
8 '-3 N. INV:671.23 (18")
EX 5' N .ST
CB
°-5
G
5.2 32' E OE
0 S. INV:671.23 (18")
.N .
10 RIM:685.39
0W.
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
AI
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
N. INV:677.49 (18")
L
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
87°-09'-45" S. INV:677.49 (16")
Greensboro
E. INV:676.99 (4")
UE
SA G
UE
OR
T MH
LO
W
B IT. RIM:685.89
NW. INV:676.14 (12")
UE
C
SE. INV:676.22 (12")
UE
HA
1.0
PP .
G OE
SW
SA
'E
T
UE
EX. REBAR
R
BU
PRO ING F.E.
ILD F.
PO W/A = 68
4.11' N.
Utica
SED TT 1.6
D
N
UE
O
1-S ACH 0
TI
TO ED
X. UE
CA
RY GA
G E
PA
5-U RAG
LO
O
W
NIT ES
113°-18'-53"
O
SA S
PR
RK
UE
UE
Buffalo
AP
T
BUILDING W/ATTACHED GARAGES
G E
EX. PIN
PROPOSED 1-STORY 4-UNIT
O
W
RO
F.F.E. = 681.15
IT S
UE
PP 8' E.SA GSW
UN AGE
Y-4 GAR
0.
R
UE
TO ED
1-S CH 0
BUILDING W/ATTACHED GARAGES
ED TA .8
OS W/AT = 684
AD
PROPOSED 1-STORY 4-UNIT
O P
PR ING .F.E.
EX 9' N
ILD F
OE
UE
5.8 /L
BU
F.F.E. = 680.40
.R .
T
±O
EB
STOP
(6
AR
UE
UE
6.0
SA SOE
')
OE
UE
UE
PP
G
T
OE PP
OE 1.0' E.
OE
W
OE EX. IP.
14
11
OE
3 .8
5
PP 7.27' NW.
°-0
NW. COR. LOT 417
6'
UE
4'- SA W
PARKING
OE
MS
Multifamily Development
47
STOP LOT
OE
.
S. LINE LOT 369
"
G
W
ST
12"
UE
EX. IP. A
RE
OE
.A
N. INV: 660.98 (18" HDPE) BIT
675 12" 170°-37'-13"
OE
89°-57'-36" 674
673
672 APPROX. LOCATION HYD
671 CONTRACTOR TO VERIFY LIMITS OF
WG
670 OF CEMETERY CEMETERY AND NOTIFY DESIGN
SA S
UE
ENGINEER OF ANY POTENTIAL CONFLICTS
HEAD STONES NOT
LOCATED
T OE
673
127°-49'-44"
673
14"
28"
14"
UE
EX. IP.
W. INV: 682.97
(12" HDPE)
ST
23" UE
1425 & 1475 Orchard Park Rd
COM
12"
PARKING
S. INV: 662.31 (18" HDPE) LOT
UE
EX. IP.
.
O/L STOP PART OF &
MS
146°-28'-21" D.
W. LINE LOT 417
1'
UE
L-11442, P-836 9.7
© CARMINA WOOD DESIGN
29
West Seneca, NY
UE
38"
UE
BUILDING W/ATTACHED GARAGES
EXCEPTION
COM
30"
PROPOSED 1-STORY 6 UNIT
BUILDING W/ATTACHED GARAGES
149°-26'-50"
L-3327
PROPOSED 1-STORY 6 UNIT
11"
F.F.E. = 682.80
F.F.E. = 682.80
10 24" EX. IP. P-87
PARKING 3. 2.04' NW.
UE
LOT 00
'D
.&
M
S.
SCRUB SHRUB WETLANDS (PSS) 36"
33
UE
(APPROXIMATE LOCATION) 153°-18'-56" 8.
"
14" 0'
10
D
6'-
.&
°-4
24" M
Date
S.
89
8"
UE
S.
113°-43'-57"
'M
18"
00
3.
11
UE
COM
5"
T
ND
RA
.B
UE
NE
EX. REBAR
No. Description
LI
S.
N.
M
EXCEPTION
.&
'D
12"
REVISIONS:
8" 11"
O/L
L-3036
70
2.
12" 6" 8" 12"
26
7" P-217
20" 6"
& 89'
S.
6" 12"
D. 72.
M
6" 13"
6"
')
.0
EX. IP.
133°-32'-58" 12.33' W.
0
(7
COM
EX. IP.
3.20' S.
275.56' D. & MS.
AD
87°-23'-54"
RO
20"
N. INV: 669.78 (18" HDPE)
RG
PROPOSED UTILITY LEGEND
BE
STORMWATER RUNOFF SUMMARY PROPOSED STORM SEWER ST
Overall Drainage Plan TO DETENTION:
EVENT PROP. RUNOFF (CFS) ELEVATION (FEET) STORAGE (CF)
PROPOSED SANITARY SEWER 6" SA
SCALE: 1"=50' 1-YEAR 1.94 671.04 5,335
PROPOSED WATERLINE 1" W
10-YEAR 2.82 672.95 15,013
25-YEAR 3.10 673.70 21,268
100-YEAR 3.45 674.73 34,966
PROPOSED CATCH BASIN CB
DIRECT:
EVENT PROP. RUNOFF (CFS) PROPOSED YARD DRAIN YD DRAWING NAME:
1-YEAR 0.38
10-YEAR 1.12
25-YEAR 1.57 PROPOSED MANHOLE MH Overall Drainage
100-YEAR 2.52
PROPOSED HYDRANT ASSEMBLY
Plan
TOTAL SITE:
EVENT EX. RUNOFF (CFS) PROP. RUNOFF (CFS)
1-YEAR 2.63 2.32 PROPOSED GATE VALVE GV
10-YEAR 8.17 3.94
25-YEAR 11.66 4.67 NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A Date: 5/22/26
100-YEAR 18.97 5.97 3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE
Drawn By: A. Pandolfe
COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE
BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK. Scale: As Noted
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
50 0 50 100Ft.
C-300
50' Project No: 23-4121
Page 741 of 1493
Page 742
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
UE
G
UE
EX. PIN CB
W
RIM:683.34
Utica
APPROX. LOCATION
G
N. INV:672.94 (18")
ST
UE
S. INV:673.10 (18")
OE
SA
CB
W
Buffalo
2" RIM:680.53
G
3
8'-
UE
N. INV:671.23 (18")
EX 5A' N .
CB
°-5
OE
ST W
5.2 S 2' E OE
0 S. INV:671.23 (18")
.N .
0 RIM:685.39
0.3G
1
AI
C.O. N. INV:677.49 (18")
L
UE
CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER 87°-09'-45" S. INV:677.49 (16")
UE
DRAIN @ 1.0%. COORDINATE DOWNSPOUT YD 4 E. INV:676.99 (4")
W
LOCATIONS WITH ARCHITECTURAL PLANS.
STG
RIM 680.20
OR
INV 678.70
UE
UE
SA
OT MH
OE
L
IT. RIM:685.89
W
CB 6 C.O. B
NW. INV:676.14 (12")
CH
G
RIM 679.00
UE
INV 676.80 SE. INV:676.22 (12")
SA
Multifamily Development
1 .0
130 LF 6"
W
PP .
OE
AR
HDPE @ 0.5%
G
CB 1
'E
CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER
UE
RIM 683.25
ST
DRAIN @ 1.0%. COORDINATE DOWNSPOUT
EX. REBAR
BU
PRO ING .F.E.
LOCATIONS WITH ARCHITECTURAL PLANS. INV 681.00
ILD F
126 LF 8"
PO W/A = 68
4.11' N.
W
HDPE @ 0.5%
SED TT 1.6
OE
D
SA
C.O. C.O.
G
UE
1-S ACH 0
100 LF 8"
TO ED
HDPE @ 0.7% C.O.
RY GA
PA
5-U RAG
W
NIT ES
113°-18'-53"
OE
CB 7
UE
G
RIM 678.80
SA
INV 676.30
RK
C.O. C.O. YD 5 CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER
SWT
OE
RIM 680.20 DRAIN @ 1.0%. COORDINATE DOWNSPOUT
UE
1425 & 1475 Orchard Park Rd
INV 678.05
G
CB 2 LOCATIONS WITH ARCHITECTURAL PLANS.
BUILDING W/ATTACHED GARAGES
51 LF 12" 32 LF 6" HDPE ROOF
EX. PIN RIM 683.25
PROPOSED 1-STORY 4-UNIT
HDPE @ 0.5% LEADER @ 1.0% C.O. INV 680.30 NE
RO
82 LF 12"
SA GS
F.F.E. = 681.15
CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER INV 677.97 SW IT S
OE
PP 8' E.
UN RAGE
W
HDPE @ 0.3% CB 5
UE
DRAIN @ 1.0%. COORDINATE DOWNSPOUT 52 LF 6" 4 C.O.
0.
RIM 679.80 Y - A
LOCATIONS WITH ARCHITECTURAL PLANS. YD 7 HDPE @ 0.5% T OR ED G
T
RIM 680.00 INV 676.17 32 LF 6" HDPE ROOF S
1- CH 0
BUILDING W/ATTACHED GARAGES
S ED ATTA 84.8 YD 1
AD
INV 675.92 LEADER @ 1.0% O 6
OP W/ =
PROPOSED 1-STORY 4-UNIT
RIM 683.70
PR ING .F.E.
© CARMINA WOOD DESIGN
OE
YD 6
W
EX 9' N
INV 681.98
UE
RIM 680.20 ILD F
SA
West Seneca, NY
5.8 /L W G
BU
G
F.F.E. = 680.40
C.O. C.O.
.R .
INV 677.28 12"x6" TEE
±OST E
CB 8
EB
RIM 678.80
STOP INV 677.79
(6
INV 676.05
AR
O
UE
30 LF 6" HDPE ROOF 17 LF 6" HDPE ROOF 66 LF 6"
LEADER @ 1.0% 132 LF 12" LEADER @ 1.0% HDPE @ 0.5%
6.0
HDPE @ 0.7%
SA
46 LF 6"
HDPE @ 0.5% 149 LF 8" YD 2
UE
ST
71 LF 12" HDPE @ 0.8% RIM 683.70
HDPE @ 0.5%
W
C.O. C.O. INV 681.65
')
CB 3
OE
OE
32 LF 6" HDPE ROOF RIM 682.15 PP
G
63 LF 12" 70 LF 8" OE
LEADER @ 1.0% INV 679.90 E C.O. OE
OE PP
HDPE @ 0.5% HDPE @O0.8%
E 1.0' E.
SA
UE
148 LF 12" INV 677.05 NE, NW, W OE
32 LF 6" HDPE ROOF OE
OE EX. IP.
11
HDPE @ 1.0% OE YD 3
LEADER @ 1.0%
WST
BIORETENTION AREA #1 OE
OE
RIM 684.00
5°
2,855 S.F. CB 4 PP 7.27' NW.
OE
INV 681.09
-0
G
(2,850 S.F. REQUIRED) RIM 679.90
Date
4'- SA
C.O. C.O. PARKING
TOP ELEV = 673.50 INV 675.57
47
YD 12-15 (TYP.)
RIM 673.50
BOTTOM ELEV = 673.00 STOP LOT
"
W
30 LF 6" PERF. 131 LF 12"
OE
OE
INV 669.67 HDPE @ 0.0% 121 LF 12" STM MH 1 HDPE @ 1.0%
G
HDPE @ 1.0% RIM 679.20
ST
31 LF 6" INV 675.74 N 12" W
A
48 LF 6" HDPE ROOF INV 674.21 SW, E
RE
OE
HDPE @ 0.3% EX. PIPE TO DISCHARGE
.A
OE
W
LEADER @ 1.0% DIRECTLY TO CB 12
BIT
SA
12" 170°-37'-13"
OE
HYD
ST G E
APPROX. LOCATION CB 12
No. Description
12"x6" TEE CONTRACTOR TO VERIFY LIMITS OF
O
W
INV 673.58 OF CEMETERY CEMETERY AND NOTIFY DESIGN RIM 682.90
INV 679.28
REVISIONS:
END SECTION ENGINEER OF ANY POTENTIAL CONFLICTS
INV 673.00
HEAD STONES NOT
SA
673 LOCATED 127°-49'-44"
G
OE
W
673 YD 16-18 (TYP.)
ST
RIM 673.50 14"
INV 669.67 28"
14"
END SECTION EX. IP.
INV 673.00 W. INV: 682.97
355 LF 12" HDPE @ 1.0%
EX. STORM SEWER TO BE (12" HDPE)
12" E-W INV 675.41
48 LF 12" 12" NW-SE INV 673.40 RE-ROUTED.
END SECTION
INV 669.57 HDPE @ 1.1% 73 LF 12" HDPE @ 1.0%
EX. STORM SEWER TO BE
31 LF 6" RE-ROUTED.
HDPE @ 0.3%
TOP OF CB 10 STM MH 2
POND 675.30 BIORETENTION AREA #2 END SECTION PARKING
1,700 S.F. CB 11 12"x6" TEE 123 LF 12" RIM 679.50 RIM 683.00
INV 675.00 RIM 678.00 INV 675.98 HDPE @ 1.1% INV 676.83 INV 678.55
(1,620 S.F. REQUIRED)
INV 675.48 E
LOT
TOP ELEV = 673.50
BOTTOM ELEV = 673.00 INV 673.53 NW
STORMWATER RUNOFF SUMMARY
Drainage Plan - North TO DETENTION:
PROPOSED UTILITY LEGEND
PROPOSED STORM SEWER ST
SCALE: 1"=30' EVENT PROP. RUNOFF (CFS) ELEVATION (FEET) STORAGE (CF)
1-YEAR 1.94 671.04 5,335
10-YEAR 2.82 672.95 15,013 PROPOSED SANITARY SEWER 6" SA DRAWING NAME:
25-YEAR 3.10 673.70 21,268
100-YEAR 3.45 674.73 34,966 Drainage
PROPOSED WATERLINE 1" W
DIRECT: Plan - North
EVENT PROP. RUNOFF (CFS) PROPOSED CATCH BASIN CB
1-YEAR 0.38
10-YEAR 1.12
25-YEAR 1.57 PROPOSED YARD DRAIN YD
100-YEAR 2.52 Date: 5/22/26
Drawn By: A. Pandolfe
TOTAL SITE: PROPOSED MANHOLE MH Scale: As Noted
EVENT EX. RUNOFF (CFS) PROP. RUNOFF (CFS) DRAWING NO.
1-YEAR 2.63 2.32 PROPOSED HYDRANT ASSEMBLY
10-YEAR 8.17 3.94
25-YEAR
100-YEAR
11.66
18.97
4.67
5.97 PROPOSED GATE VALVE
NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A
3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE
GV NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-301
Project No: 23-4121
COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE 30'
BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK.
Page 742 of 1493
Page 743
32 LF 6" HDPE ROOF OE YD 3
LEADER @ 1.0% HDPE @ 1.0% OE
BIORETENTION AREA #1
UE
OE RIM 684.00
2,855 S.F. CB 4 PP
OE
INV 681.09
(2,850 S.F. REQUIRED) C.O. RIM 679.90
TOP ELEV = 673.50 C.O. INV 675.57
UE
YD 12-15 (TYP.)
RIM 673.50 30 LF 6" PERF.
BOTTOM ELEV = 673.00
131 LF 12" STOP
OE
INV 669.67 HDPE @ 0.0% 121 LF 12" STM MH 1 HDPE @ 1.0%
HDPE @ 1.0% RIM 679.20
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
UE
INV 675.74 N 12"
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
31 LF 6" A
Greensboro
48 LF 6" HDPE ROOF INV 674.21 SW, E
RE
OE
HDPE @ 0.3% EX. PIPE TO DISCHARGE
LEADER @ 1.0% DIRECTLY TO CB 12 . A
BIT
UE
17 LF 8"
HDPE @ 0.5%
674
675 12" 170°-37'-13"
OE
673
25 LF 8" 672 12"x6" TEE APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF CB 12
671 RIM 682.90
HDPE @ 0.5% 670 INV 673.58 OF CEMETERY CEMETERY AND NOTIFY DESIGN
UE
END SECTION ENGINEER OF ANY POTENTIAL CONFLICTS INV 679.28
END SECTION END SECTION HEAD STONES NOT
INV 668.80 INV 673.00
INV 669.00
Utica
673 LOCATED 127°-49'-44"
END SECTION
UE
673 YD 16-18 (TYP.)
INV 669.57 RIM 673.50 14"
INV 669.67 28"
14"
Buffalo
UE
END SECTION
OUTLET INV 673.00 W. INV: 682.97
STRUCTURE 355 LF 12" HDPE @ 1.0%
RIM 674.80 EX. STORM SEWER TO BE (12" HDPE)
12" E-W INV 675.41
INV 668.93 RE-ROUTED.
UE
END SECTION 48 LF 12" 12" NW-SE INV 673.40
INV 669.57 HDPE @ 1.1% 73 LF 12" HDPE @ 1.0%
EX. STORM SEWER TO BE
31 LF 6" RE-ROUTED.
UE
10' WIDE EMERGENCY HDPE @ 0.3%
SPILLWAY ELEV. 674.80 TOP OF CB 10 STM MH 2
LINE WITH LIGHT STONE FILL POND 675.30 BIORETENTION AREA #2 END SECTION PARKING
1,700 S.F. CB 11 12"x6" TEE 123 LF 12" RIM 679.50 RIM 683.00
RIP RAP FLUSH WITH SPILLWAY INV 675.00 RIM 678.00 INV 675.98 HDPE @ 1.1% INV 676.83 INV 678.55
(1,620 S.F. REQUIRED) LOT
UE
TOP ELEV = 673.50 INV 675.48 E
BOTTOM ELEV = 673.00 INV 673.53 NW
UE
20 LF 6" PERF. 40 LF 6" HDPE ROOF STOP
Multifamily Development
HDPE @ 0.0% LEADER @ 1.0% C.O. C.O. C.O. C.O.
146°-28'-21"
PART OF
L-11442, P-836
UE
CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER
UE
DRAIN @ 1.0%. COORDINATE DOWNSPOUT
LOCATIONS WITH ARCHITECTURAL PLANS.
UE
YD 8
UE
209 LF 12"
1425 & 1475 Orchard Park Rd
BUILDING W/ATTACHED GARAGES
HDPE @ 0.8% RIM 681.90
INV 679.80
PROPOSED 1-STORY 6 UNIT
BUILDING W/ATTACHED GARAGES
149°-26'-50"
PROPOSED 1-STORY 6 UNIT
UE
F.F.E. = 682.80
F.F.E. = 682.80
63 LF 8"
CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER HDPE @ 0.5% PARKING
DRAIN @ 1.0%. COORDINATE DOWNSPOUT
UE
LOT
© CARMINA WOOD DESIGN
LOCATIONS WITH ARCHITECTURAL PLANS.
West Seneca, NY
UE
YD 9
SCRUB SHRUB WETLANDS (PSS) RIM 681.90
(APPROXIMATE LOCATION) INV 679.48 153°-18'-56"
UE
32 LF 6" HDPE ROOF
CB 9 LEADER @ 1.0% 8"
RIM 681.00
UE
73 LF 8"
INV 678.50 HDPE @ 0.5%
UE
36 LF 8"
Date
C.O. C.O. HDPE @ 0.5% C.O.
UE
C.O.
32 LF 6" HDPE ROOF YD 11
LEADER @ 1.0% RIM 681.70 YD 10
INV 678.68 85 LF 8" RIM 681.90
UE
HDPE @ 0.5% INV 679.11
UE
No. Description
12"
REVISIONS:
8" 11"
6" 8" 12"
7"
6"
6" 6" 12"
13"
6"
133°-32'-58"
STORMWATER RUNOFF SUMMARY PROPOSED UTILITY LEGEND
Drainage Plan - South TO DETENTION:
EVENT PROP. RUNOFF (CFS) ELEVATION (FEET) STORAGE (CF)
PROPOSED STORM SEWER ST
1-YEAR 1.94 671.04 5,335 PROPOSED SANITARY SEWER 6" SA DRAWING NAME:
SCALE: 1"=30' 10-YEAR 2.82 672.95 15,013
25-YEAR 3.10 673.70 21,268
PROPOSED WATERLINE 1" W
Drainage
100-YEAR 3.45 674.73 34,966
DIRECT:
Plan - South
PROPOSED CATCH BASIN CB
EVENT PROP. RUNOFF (CFS)
1-YEAR 0.38
10-YEAR 1.12 PROPOSED YARD DRAIN YD
25-YEAR 1.57 Date: 5/22/26
100-YEAR 2.52
Drawn By: A. Pandolfe
PROPOSED MANHOLE MH
TOTAL SITE: Scale: As Noted
DRAWING NO.
EVENT EX. RUNOFF (CFS) PROP. RUNOFF (CFS) PROPOSED HYDRANT ASSEMBLY
1-YEAR 2.63 2.32
10-YEAR
25-YEAR
100-YEAR
8.17
11.66
18.97
3.94
4.67
5.97
PROPOSED GATE VALVE GV
NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A
3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-302
Project No: 23-4121
COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE 30'
BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK.
Page 743 of 1493
Page 744
6'
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
2'
DETECTABLE TAPE, 1'-6"
TRENCH WIDTH BELOW FINISHED GRADE
WIDTH OF PIPE
(I.D. + 24")
2
Utica
2'
12" (I.D.) 12"
Buffalo
12"
1
. PLAN VIEW
O.D.
IA
.)
D
D
(I.
(6"MIN.)
1/3 I.D.
(12"MAX.)
NOTES:
A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS.
Multifamily Development
B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING.
6'-0"
C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL
PLACEMENT AND MAXIMUM PAY LIMITS.
D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL
BE USED IN ALL UNSHEETED TRENCH AREAS.
MATERIALS ELEVATION
PIPE BEDDING MATERIAL (NYSDOT 1985 EDITION)
1 NO. 1 CRUSHED STONE OR CRUSHED GRAVEL WITH A GRADATION CONFORMING WITH NYSDOT
SECTION 703-02. THE MATERIAL SHALL BE WELL GRADED WITH NO PARTICLES LARGER THAN ONE
INCH AND HAVING A MAXIMUM GRADATION MEETING THE LIMITS DESCRIBED IN THE TYPICAL PIPE OUTLET W/END SECTION & RIP RAP
SPECIFICATIONS. THE BEDDING SHALL BE COMPACTED IN 6" LIFTS WITH EQUIPMENT
ACCEPTABLE TO THE PIPE MANUFACTURER.
1425 & 1475 Orchard Park Rd
NO SLAG SHALL BE ALLOWED FOR MATERIAL 1
2 TYPE 2 CRUSHED STONE OR CRUSHED GRAVEL WITH A GRADATION CONFORMING WITH NYSDOT
SECTION 304-2.02 TYPE 2. THE MATERAIL SHALL BE WELL GRADED WITH NO PARTICLES LARGER THAN TYPICAL PRECAST CATCH BASIN
TWO INCHES AND HAVING A MAXIMUM GRADATION MEETING THE LIMITS DESCRIBED IN THE
SPECIFICATIONS. THE BEDDING SHALL BE COMPACTED IN 6" LIFTS WITH EQUIPMENT
© CARMINA WOOD DESIGN
ACCEPTABLE TO THE PIPE MANUFACTURER.
West Seneca, NY
NO SLAG SHALL BE ALLOWED FOR MATERIAL 2
STORM SEWER TRENCH SECTION
IN PAVED AREAS
GRADE
Date
6" TOPSOIL (MIN.)
HYDROSEED
3H
8" DIA. INLINE YARD DRAIN WITH "STANDARD" GRATE 1V NOTES:
MAX. PONDING/
OVERFLOW ELEV. 1. FILTER FABRIC TO BE NON-WOVEN CLASS 'C', MIRAFI 180-N OR
6"
EXCAVATED FROM TRENCH
RIM OF YD
APPROVED EQUIVALENT
BACKFILL WITH MATERIAL
DETECTABLE TAPE, 1'-6" EL. 673.50
6" PONDING HEIGHT
BELOW FINISHED GRADE EL. 673.00 2. DRAINAGE GRAVEL TO MEET AASHTO M-43. NO.67, SIZE 0.25" TO
TRENCH WIDTH
0.75"
(I.D. + 24")
3. CONTRACTOR TO PROVIDE PLANTING SOIL SUBMITTAL
No. Description
SPECIFICATION FOR REVIEW AND APPROVAL PRIOR TO
2 CONSTRUCTION.
YARD DRAINS SHALL BE 4. BIORETENTION SOIL IS NOT TO BE INSTALLED UNTIL SITE IS
REVISIONS:
NYLOPLAST AMERICA INC. OR APPROVED EQUAL STABILIZED.
30" MIN. PLANTING SOIL DEPTH
PLANTING SOIL BED NOTE:PLANTING SOIL SHALL BE LOAM/SAND MIX CONTAINING A
MINIMUM OF 35 TO 60% SAND BY VOLUME AND LESS THAN 25% CLAY.
12" (I.D.) 12" SOIL SHOULD FALL WITHIN USCS TYPES SM OR ML WITH PERMEABILITY
OF AT LEAST 1.0 FEET PER DAY. SOIL SHOULD BE FREE FROM STONES,
HDPE RISER PIPE STUMPS, ROOTS OR OTHER WOODY MATERIAL OVER 1" IN DIAMETER.
TOP OF PIPE ZONE
6" PERFORATED HDPE PLACEMENT OF THE PLANTING SOIL SHOULD BE IN LIFTS OF 12" TO
12"
UNDERDRAIN IN 10" EL. 670.50 18", LOOSELY COMPACTED.
1 DRAINAGE GRAVEL JACKET
EL. 669.67 CHARACTERISTICS SHALL BE:
PH RANGE: 5.2 - 7.00
. ORGANIC MATTER: 1.5 - 4.0%
O.D.
IA FILTER FABRIC
.)
D MAGNESIUM: 35 LBS PER ACRE MIN.
D
6" PHDPE SUBGRADE OR EX.
(I.
SOIL PHOSPHORUS: 75 LBS PER ACRE MIN.
UNDERDRAIN DRAINAGE GRAVEL
POTASSIUM: 85 LBS PER ACRE MIN.
(6"MIN.) PIPE @ 0.0% SOLUBLE SALTS: 500 PPM
1/3 I.D.
(12"MAX.) 90° HDPE ELBOW CLAY: 10 TO 25%
SILT: 30 TO 55%
BIORETENTION AREA #1 & #2 - TYPICAL SECTION SAND: 35 TO 60%
NOTE:
FOR INLINE DRAINS, THE ELBOW SHALL
NOTES:
BE REPLACED BY A TEE
A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS.
bio-retention area seeding spec (Northeast Wetland Grass Seed Mix):
B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING. HDPE PIPE, SEE PLAN FOR SIZE & SLOPE
Seed Mixture Variety Percent by No. of Seeds
C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL Creeping Bentgrass Agrostis stolonifera 63.0
PLACEMENT AND MAXIMUM PAY LIMITS. Rough Bluegrass Poa trivialis 17.0
NOTE: Meadow Foxtail Alopecurus arundinaceus 11.0
D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL SEE TYPICAL TRENCH SECTION FOR BEDDING REQUIREMENTS Annual Ryegrass Lolium multiflorum 4.5
BE USED IN ALL UNSHEETED TRENCH AREAS. Deertongue Panicum clandestinum 4.5
MATERIALS DRAWING NAME:
PIPE BEDDING MATERIAL (NYSDOT 1985 EDITION)
TYPICAL YARD DRAIN DETAIL Drainage Details
1 NO. 1 CRUSHED STONE OR CRUSHED GRAVEL WITH A GRADATION CONFORMING WITH NYSDOT
SECTION 703-02. THE MATERIAL SHALL BE WELL GRADED WITH NO PARTICLES LARGER THAN ONE
INCH AND HAVING A MAXIMUM GRADATION MEETING THE LIMITS DESCRIBED IN THE
SPECIFICATIONS. THE BEDDING SHALL BE COMPACTED IN 6" LIFTS WITH EQUIPMENT
ACCEPTABLE TO THE PIPE MANUFACTURER.
NO SLAG SHALL BE ALLOWED FOR MATERIAL 1
Date: 5/22/26
2 BACKFILL MATERIAL SHALL BE NATIVE SOIL CONTAINING NO UNSUITABLE MATERIAL
COMPACTED IN 6" LIFTS.
Drawn By: A. Pandolfe
Scale: As Noted
DRAWING NO.
STORM SEWER TRENCH SECTION
IN UNPAVED AREAS C-303
Project No: 23-4121
Page 744 of 1493
Page 745
EX. PIN CB
UE
RIM:683.34
G
APPROX. LOCATION
W
N. INV:672.94 (18")
ST
S. INV:673.10 (18")
SA
CB
OE
" RIM:680.53
32
UE
8'- N. INV:671.23 (18")
EX 5' N .ST
-5 CB
G
°
5.2 32' E OE
00 S. INV:671.23 (18")
.N .
RIM:685.39
0W.
1
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
AI
N. INV:677.49 (18")
L
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
87°-09'-45" S. INV:677.49 (16")
Greensboro
E. INV:676.99 (4")
UE
SA G
UE
OR
T MH
LO
W
T. RIM:685.89
BI
NW. INV:676.14 (12")
UE
CH
SE. INV:676.22 (12")
UE
1 .0
PP .
G OE
AR
SW
SA
'E
T
UE
EX. REBAR
BU
PRO ING F.E.
ILD F.
PO W/A = 68
Utica
4.11' N.
SED TT 1.6
D
N
UE
O
1-S ACH 0
TI
TO ED
X. UE
CA
RY GA
G E
PA
5 -U R A G
LO
O
W
NIT ES
113°-18'-53"
O
SA S
PR
RK
Buffalo
UE
UE
AP
T OE
BUILDING W/ATTACHED GARAGES
G
EX. PIN
PROPOSED 1-STORY 4-UNIT
W
RO
F.F.E. = 681.15
IT S
UE
PP 8' E.SA GSW
UN GE
-4 RA
0.
RY D GA
UE
O
T E
1-S ACH 80
BUILDING W/ATTACHED GARAGES
SED TT 4.
A
PO W/A . = 68
PROPOSED 1-STORY 4-UNIT
O
PR ING .F.E
EX 9' N
ILD F
OE
UE
D
5.8 /L
BU
F.F.E. = 680.40
.R .
T
±O
EB
STOP
(6
AR
UE
UE
6. 0
SA SOE
')
OE
UE
UE
PP
G
T
OE PP
OE 1.0' E.
OE
W
OE EX. IP.
14
11
OE
3.8
5
PP 7.27' NW.
°-0
NW. COR. LOT 417
UE
6'
4'- SA W
PARKING
OE
Multifamily Development
MS
47
STOP LOT
OE
.
S. LINE LOT 369
"
G
W
ST
12"
UE
EX. IP. A
RE
OE
. A
N. INV: 660.98 (18" HDPE) BIT
675 12" 170°-37'-13"
OE
89°-57'-36" 674
673
672 APPROX. LOCATION HYD
671 CONTRACTOR TO VERIFY LIMITS OF
WG
670 OF CEMETERY CEMETERY AND NOTIFY DESIGN
SA S
UE
ENGINEER OF ANY POTENTIAL CONFLICTS
HEAD STONES NOT
LOCATED
T OE
673
127°-49'-44"
673
14"
28"
14"
UE
EX. IP.
W. INV: 682.97
(12" HDPE)
ST
23"
UE
1425 & 1475 Orchard Park Rd
COM
12"
PARKING
S. INV: 662.31 (18" HDPE) LOT
UE
EX. IP.
.
O/L STOP PART OF MS
146°-28'-21" .&
'D
W. LINE LOT 417
UE
1
© CARMINA WOOD DESIGN
L-11442, P-836 29
9.7
West Seneca, NY
UE
38"
UE
BUILDING W/ATTACHED GARAGES
EXCEPTION
COM
30"
PROPOSED 1-STORY 6 UNIT
BUILDING W/ATTACHED GARAGES
149°-26'-50"
L-3327
PROPOSED 1-STORY 6 UNIT
11"
F.F.E. = 682.80
F.F.E. = 682.80
10 24" EX. IP. P-87
PARKING 3. 2.04' NW.
UE
LOT 00
'D
.&
M
S.
SCRUB SHRUB WETLANDS (PSS) 36"
33
UE
(APPROXIMATE LOCATION) 153°-18'-56" 8.
"
14" 0'
10
D
6'-
.&
°-4
Date
24" M
S.
89
8"
UE
S.
113°-43'-57"
'M
18"
00
3.
11
UE
COM
5"
T
ND
RA
.B
UE
E
IN
EX. REBAR
No. Description
L
S.
N.
M
EXCEPTION
.&
REVISIONS:
'D
8" 12" 11"
O/L
L-3036
70
2.
12" 6" 8" 12"
26
7" P-217
20" 6"
& 89'
S.
6" 12"
D. 72.
M
6" 13"
6"
0')
EX. IP.
133°-32'-58"
0.
12.33' W.
(7
COM
EX. IP.
3.20' S.
275.56' D. & MS.
AD
87°-23'-54"
RO
20"
N. INV: 669.78 (18" HDPE)
RG
PROPOSED UTILITY LEGEND
Overall Utility Plan
BE
PROPOSED STORM SEWER ST
SCALE: 1"=50'
PROPOSED SANITARY SEWER 6" SA
UTILITY NOTES: NOTES: 1" W
PROPOSED WATERLINE
1. FOR ALL SANITARY SEWERS, INSTALL SELECT FILL IN PAVED AREAS, EXTEND 5' MIN. BEYOND PAVEMENT LIMITS 1. ALL SANITARY SEWER CONSTRUCTION SHALL CONFORMTOWNTOOF WEST SENECA SEWER
SPECIFICATIONS AND DETAILS, AND ERIE COUNTY DEPARTMENT OF HEALTH RULES AND
2. BUILDINGS TO HAVE6"AHOUSE TRAP, VENT AND CLEANOUT INSTALLED AT ENTRANCE POINT. INVERT ELEVATION REGULATIONS. PROPOSED CATCH BASIN CB
TO BE5' MIN.BELOW F.F.E. OF THE BUILDING. PIPE TO
6" SDR-35
BE PVC @ 1.0% MIN WITH MIN 4' OF COVER. ADD
ADDITIONAL CLEANOUTS @ 100' MAX. SPACING 6" LATERALS
FOR OVER 90' IN LENGTH. 2. PRIOR STARTING ANY WORK ASSOCIATED WITH OR NEAR EXISTING SANITARY MANHOLES,
THE CONTRACTOR SHALL MEET WITHTOWN
THE OF WEST SENECA
TO DISCUSS AND AGREE PROPOSED YARD DRAIN YD DRAWING NAME:
3. COORDINATE GAS & ELEC. METER BANK LOCATIONS ON BUILDINGS WITH M.E.P. PLANS & UTILITY CO.'S. TO THE WORK.
4. COORDINATE LOCATION OF CTV & TELEPHONE SERVICE TO BUILDINGS WITH M.E.P. PLANS AND UTILITY CO.'S. 3. FILL SHALL BE PLACED AND SATISFACTORILY COMPACTED PRIOR TO INSTALLATION OF PROPOSED MANHOLE MH Overall Utility Plan
UTILITIES, AND MUST BE APPROVED BY THE SUPERVISING PROJECT ENGINEER.
5. ANY EXISTING UTILITIES WHICH ARE TO BE ABANDONED AND FALL UNDER PAVEMENT OR BUILDINGS SHALL BE
REMOVED VS. BEING ABANDONED UNLESS THOSE UTILITIES ARE FILLED WITH FLOWABLE FILL. 4. ALL OTHER REQUIRED PERMITS BY THE STATE OF NEW YORK, COUNTY OFTOWN
ERIE AND PROPOSED HYDRANT ASSEMBLY
OF WEST SENECA
ARE THE RESPONSIBILITY OF THE CONTRACTOR/DEVELOPER.
6. EXISTING GAS SERVICES TO REMAIN UNLESS OTHERWISE NOTED. ANY PORTIONS TO BE RELOCATED SHALL BE
COORDINATED WITH NATIONAL FUEL GAS. PROPOSED GATE VALVE GV
7. ALL UNDERGROUND TELEPHONE SERVICES SHALL REMAIN AND BE PROTECTED DURING CONSTRUCTION.
NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A Date: 5/22/26
3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE Drawn By: A. Pandolfe
8. A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES OF VERTICAL SEPARATION MUST BE MAINTAINED BETWEEN ALL COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE Scale: As Noted
SANITARY SEWER AND WATER SERVICES. BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK.
DRAWING NO.
9. ERIE COUNTY WATER AUTHORITY (ECWA) IS TO BE NOTIFIED A MINIMUM OF 48-HOURS PRIOR TO STARTING THE
CONNECTION TO THE NEW WATER SERVICE.
10. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM, SANITARY) THAT CROSS THROUGH
PAVEMENT AREAS.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
50 0 50 100Ft.
C-400
50' Project No: 23-4121
Page 745 of 1493
Page 746
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
UE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
G
UE
EX. PIN CB
W
RIM:683.34
APPROX. LOCATION
G
N. INV:672.94 (18")
ST
UE
S. INV:673.10 (18")
Utica
OE
SA
CB
W
" RIM:680.53
G
' - 32
UE
8 N. INV:671.23 (18")
EX 5A' N .
-5 CB
OE
°
ST W
5.2 S 2' E OE
Buffalo
0 S. INV:671.23 (18")
.N .
10 RIM:685.39
0.3G
AI
N. INV:677.49 (18")
L
UE
87°-09'-45" S. INV:677.49 (16")
E. INV:676.99 (4")
W
STG
OR
UE
SA
O T MH
OE
T .L RIM:685.89
BI
W
NW. INV:676.14 (12")
C
G
UE
HEATED ENCLOSURE SE. INV:676.22 (12")
6" TAPPING SLEEVE
HA
FOR 6" RPZ & METER
SA
& VALVE (BY ECWA)
1.0
63 LF 8" SDR-35
W
PP .
OE
6"-45° BENDS PVC PRIVATE SAN
G
'E
UE
SEWER @ 0.4%
ST
Multifamily Development
EX. REBAR 8"x6" WYE
RD
BU
PRO ING .F.E.
ILD F
SAN MH 1 INV 676.66 WATERTIGHT CONNECTION
PO W/A = 68
4.11' N.
W
SED TT 1.6
OE
RIM 684.10 TO EX. MH, INV 676.30
SA
G
UE
1-S ACH 0
6" AWWA C-900 PVC WATER INV 676.55
TO ED
MAIN (MIN. 5' COVER)
RY GA
PA
5-U RAG
W
NIT ES
113°-18'-53"
OE
UE
G
285 LF 3" SDR-21 PVC PRIVATE
FORCE MAIN (MIN. 4' COVER)
SA
RK
27 LF 6" SDR-35 PVC
INV 679.80
SWT
SANITARY SEWER
OE
REDUCE TO 2"
UE
18" MIN. VERTICAL LATERAL @ 1.0% MIN.
G
DOMESTIC SERVICE
BUILDING W/ATTACHED GARAGES
INSIDE BUILDING EX. PIN SEPARATION (TYP.) INSTALL C.O., TRAP AND
PROPOSED 1-STORY 4-UNIT
VENT IN GREENSPACE
RO
SA GS
1425 & 1475 Orchard Park Rd
F.F.E. = 681.15
6"x6"x4" TEE IT ES
OE
PP ' E.
INV 675.60
W
6" STM INV 680.54 UN RAG
UE
4
0.8
4" GATE VALE -
3" SAN INV 679.29 RY GA
TO HED
T
4" AWWA C-900 - S
1 AC 80
BUILDING W/ATTACHED GARAGES
INSTALL C.O., TRAP AND PVC DOMESTIC SED /ATT 684.
AD
O
PROPOSED 1-STORY 4-UNIT
VENT IN GREENSPACE WATER SERVICE OP W =
PR ING .F.E.
OE
W
EX 9' N
UE
(MIN. 5' COVER) ILD F
SA
5.8 /L W G
BU
G
F.F.E. = 680.40
93 LF 6" SDR-35 PVC SANITARY
.R .
±OST E
REDUCE TO 2" SEWER LATERAL @ 1.0% MIN.
© CARMINA WOOD DESIGN
EB
DOMESTIC SERVICE
STOP 6"x6"x4" TEE REDUCE TO 2"
(6
DOMESTIC SERVICE
West Seneca, NY
AR
O
INSIDE BUILDING 4" AWWA C-900
UE
6" STM INV 677.14 INSIDE BUILDING
INV 674.15 6" SAN INV 675.20 PVC DOMESTIC
6.0
WATER SERVICE
SA
6"x4" REDUCER INSTALL C.O., TRAP AND (MIN. 5' COVER)
HYDRANT 12" STM INV 676.95
4" GATE VALE VENT IN GREENSPACE 4" GATE VALE
UE
6" AWWA C-900 PVC WATER ASSEMBLY 6" SAN INV 675.04
ST
REDUCE TO 2"
6"-45° BENDS MAIN
47 LF 6" SDR-35 PVC(MIN. 5' COVER)
SANITARY
W
DOMESTIC SERVICE 4"-45° BENDS
')
OE
SEWER LATERAL @ 2.4% MIN. 6"-22.5° OE
INSIDE BUILDING 6"x6"x6" TEE & (2) PP
G
4" AWWA C-900 PVC DOMESTIC BEND 8" STM INV 680.18 OE
OE
PP
SERVICE (MIN. 5' COVER) 6" GATE VALVES OE
INV 673.15 12" STM INV 674.98 3" SAN INV 678.47 OE 1.0' E.
SA
UE
4"-45° BENDS OE
6" SAN INV 673.86 OE
OE EX. IP.
11
INSTALL C.O., TRAP AND 18" MIN. VERTICAL OE
WT
OE
S
OE
SEPARATION (TYP.)
5°
VENT IN GREENSPACE 4" GATE VALE PP 7.27' NW.
OE
-0
G
4'- SA
PARKING
SAN MH 2
47
6"x6"x4" TEE
6"-22.5° STOP 8"x6" WYE PUMP STATION LOT
"
W
OE
OE
Date
202 LF 8" SDR-35 BEND INV 670.86 RIM 682.40
15 LF 6" SDR-35 PVC SANITARY
G
C.O. INV 678.40 NE
ST
SEWER LATERAL @ 1.0% MIN. C.O. SAN MH 5 PVC PRIVATE SAN
RIM 678.00 SEWER @ 0.4%12" INV 673.20 SW
A W
4" AWWA C-900 PVC DOMESTIC INV 670.68 W
RE
OE
71 LF 6" SDR-35 PVC SANITARY INV 673.00 N
A
OE
W
SERVICE (MIN. 5' COVER) SEWER LATERAL @ 1.0% MIN. INV 671.59 W 6" AWWA C-900 PVC DOMESTIC .
WATER (MIN. 5' COVER) BIT
SA
INV 671.49 E
12" 170°-37'-13"
71 LF 6" SDR-35 PVC SANITARY
OE
HYD
ST G E
SEWER LATERAL @ 1.0% MIN. APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF
O
W
OF CEMETERY CEMETERY AND NOTIFY DESIGN
12" STM INV 674.00 ENGINEER OF ANY POTENTIAL CONFLICTS
HEAD STONES NOT
No. Description
8" SAN INV 672.50
SA
673 LOCATED 127°-49'-44"
G
OE
REVISIONS:
W
673
ST
14" 6"-22.5°
28" BEND
14"
EX. IP.
W. INV: 682.97
180 LF 8" SDR-35
6" AWWA C-900 PVC WATER 4" AWWA C-900 PVC PVC PRIVATE SAN
(12" HDPE)
18" MIN. VERTICAL MAIN (MIN. 5' COVER) DOMESTIC SERVICE SEWER @ 0.4%
Utility Plan - North
SCALE: 1"=30' PROPOSED UTILITY LEGEND
PROPOSED STORM SEWER ST
PROPOSED SANITARY SEWER 6" SA
UTILITY NOTES: NOTES: 1" W
PROPOSED WATERLINE
1. FOR ALL SANITARY SEWERS, INSTALL SELECT FILL IN PAVED AREAS, EXTEND 5' MIN. BEYOND PAVEMENT LIMITS 1. ALL SANITARY SEWER CONSTRUCTION SHALL CONFORMTOWNTOOF WEST SENECA SEWER
SPECIFICATIONS AND DETAILS, AND ERIE COUNTY DEPARTMENT OF HEALTH RULES AND
2. BUILDINGS TO HAVE6"AHOUSE TRAP, VENT AND CLEANOUT INSTALLED AT ENTRANCE POINT. INVERT ELEVATION REGULATIONS. PROPOSED CATCH BASIN CB
TO BE5' MIN.BELOW F.F.E. OF THE BUILDING. PIPE TO
6" SDR-35
BE PVC @ 1.0% MIN WITH MIN 4' OF COVER. ADD
ADDITIONAL CLEANOUTS @ 100' MAX. SPACING 6" LATERALS
FOR OVER 90' IN LENGTH. 2. PRIOR STARTING ANY WORK ASSOCIATED WITH OR NEAR EXISTING SANITARY MANHOLES,
THE CONTRACTOR SHALL MEET WITHTOWN
THE OF WEST SENECA
TO DISCUSS AND AGREE PROPOSED YARD DRAIN YD DRAWING NAME:
3. COORDINATE GAS & ELEC. METER BANK LOCATIONS ON BUILDINGS WITH M.E.P. PLANS & UTILITY CO.'S. TO THE WORK.
4. COORDINATE LOCATION OF CTV & TELEPHONE SERVICE TO BUILDINGS WITH M.E.P. PLANS AND UTILITY CO.'S. 3. FILL SHALL BE PLACED AND SATISFACTORILY COMPACTED PRIOR TO INSTALLATION OF PROPOSED MANHOLE MH Utility Plan - North
UTILITIES, AND MUST BE APPROVED BY THE SUPERVISING PROJECT ENGINEER.
5. ANY EXISTING UTILITIES WHICH ARE TO BE ABANDONED AND FALL UNDER PAVEMENT OR BUILDINGS SHALL BE
REMOVED VS. BEING ABANDONED UNLESS THOSE UTILITIES ARE FILLED WITH FLOWABLE FILL. 4. ALL OTHER REQUIRED PERMITS BY THE STATE OF NEW YORK, COUNTY OFTOWN
ERIE AND PROPOSED HYDRANT ASSEMBLY
OF WEST SENECA
ARE THE RESPONSIBILITY OF THE CONTRACTOR/DEVELOPER.
6. EXISTING GAS SERVICES TO REMAIN UNLESS OTHERWISE NOTED. ANY PORTIONS TO BE RELOCATED SHALL BE
COORDINATED WITH NATIONAL FUEL GAS. PROPOSED GATE VALVE GV
7. ALL UNDERGROUND TELEPHONE SERVICES SHALL REMAIN AND BE PROTECTED DURING CONSTRUCTION.
NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A Date: 5/22/26
3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE Drawn By: A. Pandolfe
8. A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES OF VERTICAL SEPARATION MUST BE MAINTAINED BETWEEN ALL COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE Scale: As Noted
SANITARY SEWER AND WATER SERVICES. BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK.
DRAWING NO.
9. ERIE COUNTY WATER AUTHORITY (ECWA) IS TO BE NOTIFIED A MINIMUM OF 48-HOURS PRIOR TO STARTING THE
CONNECTION TO THE NEW WATER SERVICE.
10. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM, SANITARY) THAT CROSS THROUGH
PAVEMENT AREAS.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-401
Project No: 23-4121
30'
Page 746 of 1493
Page 747
6"-22.5° STOP 8"x6" WYE PUMP STATION
OE
202 LF 8" SDR-35 BEND INV 670.86 RIM 682.40
15 LF 6" SDR-35 PVC SANITARY C.O.
C.O. SAN MH 5 INV 678.40 NE
UE
SEWER LATERAL @ 1.0% MIN. PVC PRIVATE SAN
RIM 678.00 SEWER @ 0.4%12" INV 673.20 SW
4" AWWA C-900 PVC DOMESTIC INV 670.68 W EA
OE
INV 673.00 N
SERVICE (MIN. 5' COVER)
71 LF 6" SDR-35 PVC SANITARY
SEWER LATERAL @ 1.0% MIN. INV 671.59 W 6" AWWA C-900 PVC DOMESTIC . AR
BI T
UE
INV 671.49 E WATER (MIN. 5' COVER)
170°-37'-13"
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
675
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
674 71 LF 6" SDR-35 PVC SANITARY
12"
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
OE
673
Greensboro
672 SEWER LATERAL @ 1.0% MIN. APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF
671
670 OF CEMETERY CEMETERY AND NOTIFY DESIGN
UE
12" STM INV 674.00 ENGINEER OF ANY POTENTIAL CONFLICTS
8" SAN INV 672.50 HEAD STONES NOT
673 LOCATED 127°-49'-44"
UE
673 6"-22.5°
14" BEND
28"
14"
Utica
UE
W. INV: 682.97
180 LF 8" SDR-35
6" AWWA C-900 PVC WATER 4" AWWA C-900 PVC PVC PRIVATE SAN
(12" HDPE)
18" MIN. VERTICAL MAIN (MIN. 5' COVER) DOMESTIC SERVICE
UE
Buffalo
SEWER @ 0.4%
SEPARATION (TYP.) (MIN. 5' COVER)
SAN MH 4
RIM 680.00
UE
6"x4" REDUCER
INV 675.00 E
6"-45° BEND
6"x6"x4" TEE PARKING
4"-45° BENDS HYDRANT LOT
UE
8"x6" WYE 12" STM INV 677.07 8"x6" WYE ASSEMBLY
INV 675.14 8" SAN INV 674.74 INV 674.62
UE
11 LF 6" SDR-35 PVC SANITARY
STOP 11 LF 6" SDR-35 PVC SANITARY SAN MH 3
PART OF
4" GATE VALE SEWER LATERAL @ 1.0% MIN. SEWER LATERAL @ 1.0% MIN. RIM 686.00 146°-28'-21"
4" GATE VALE INV 674.02 W
L-11442, P-836
UE
INSTALL C.O., TRAP AND INV 673.92 NE
VENT IN GREENSPACE INSTALL C.O., TRAP AND
Multifamily Development
VENT IN GREENSPACE
INV 677.80 246 LF 8" SDR-35
REDUCE TO 2" INV 677.80
UE
PVC PRIVATE SAN REDUCE TO 2"
DOMESTIC SERVICE SEWER @ 0.4% DOMESTIC SERVICE
INSIDE BUILDING INSIDE BUILDING
UE
UE
BUILDING W/ATTACHED GARAGES
PROPOSED 1-STORY 6 UNIT
BUILDING W/ATTACHED GARAGES
149°-26'-50"
PROPOSED 1-STORY 6 UNIT
UE
F.F.E. = 682.80
F.F.E. = 682.80
1425 & 1475 Orchard Park Rd
PARKING
UE
LOT
UE
SCRUB SHRUB WETLANDS (PSS)
© CARMINA WOOD DESIGN
(APPROXIMATE LOCATION)
West Seneca, NY
153°-18'-56"
UE
8"
UE
UE
UE
Date
UE
UE
8" 12" 11"
6" 8"
No. Description
7" 12"
6"
REVISIONS:
6" 6" 12"
13"
6"
133°-32'-58"
PROPOSED UTILITY LEGEND
PROPOSED STORM SEWER ST
Utility Plan - South PROPOSED SANITARY SEWER 6" SA
UTILITY NOTES: NOTES:
SCALE: 1"=30' 1" W
PROPOSED WATERLINE
1. FOR ALL SANITARY SEWERS, INSTALL SELECT FILL IN PAVED AREAS, EXTEND 5' MIN. BEYOND PAVEMENT LIMITS 1. ALL SANITARY SEWER CONSTRUCTION SHALL CONFORMTOWNTOOF WEST SENECA SEWER
SPECIFICATIONS AND DETAILS, AND ERIE COUNTY DEPARTMENT OF HEALTH RULES AND
2. BUILDINGS TO HAVE6"AHOUSE TRAP, VENT AND CLEANOUT INSTALLED AT ENTRANCE POINT. INVERT ELEVATION REGULATIONS.
TO BE5' MIN.BELOW F.F.E. OF THE BUILDING. PIPE TO
6" SDR-35
BE PVC @ 1.0% MIN WITH MIN 4' OF COVER. ADD
PROPOSED CATCH BASIN CB
ADDITIONAL CLEANOUTS @ 100' MAX. SPACING 6" LATERALS
FOR OVER 90' IN LENGTH. 2. PRIOR STARTING ANY WORK ASSOCIATED WITH OR NEAR EXISTING SANITARY MANHOLES,
THE CONTRACTOR SHALL MEET WITHTOWN
THE OF WEST SENECA
TO DISCUSS AND AGREE DRAWING NAME:
3. COORDINATE GAS & ELEC. METER BANK LOCATIONS ON BUILDINGS WITH M.E.P. PLANS & UTILITY CO.'S. TO THE WORK.
PROPOSED YARD DRAIN YD
4. COORDINATE LOCATION OF CTV & TELEPHONE SERVICE TO BUILDINGS WITH M.E.P. PLANS AND UTILITY CO.'S. 3. FILL SHALL BE PLACED AND SATISFACTORILY COMPACTED PRIOR TO INSTALLATION OF
Utility Plan - South
UTILITIES, AND MUST BE APPROVED BY THE SUPERVISING PROJECT ENGINEER.
PROPOSED MANHOLE MH
5. ANY EXISTING UTILITIES WHICH ARE TO BE ABANDONED AND FALL UNDER PAVEMENT OR BUILDINGS SHALL BE
REMOVED VS. BEING ABANDONED UNLESS THOSE UTILITIES ARE FILLED WITH FLOWABLE FILL. 4. ALL OTHER REQUIRED PERMITS BY THE STATE OF NEW YORK, COUNTY OFTOWN
ERIE AND PROPOSED HYDRANT ASSEMBLY
OF WEST SENECA
ARE THE RESPONSIBILITY OF THE CONTRACTOR/DEVELOPER.
6. EXISTING GAS SERVICES TO REMAIN UNLESS OTHERWISE NOTED. ANY PORTIONS TO BE RELOCATED SHALL BE
COORDINATED WITH NATIONAL FUEL GAS. PROPOSED GATE VALVE GV
Date: 5/22/26
7. ALL UNDERGROUND TELEPHONE SERVICES SHALL REMAIN AND BE PROTECTED DURING CONSTRUCTION. NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A Drawn By: A. Pandolfe
3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE
8. A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES OF VERTICAL SEPARATION MUST BE MAINTAINED BETWEEN ALL COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE Scale: As Noted
SANITARY SEWER AND WATER SERVICES. BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK. DRAWING NO.
9. ERIE COUNTY WATER AUTHORITY (ECWA) IS TO BE NOTIFIED A MINIMUM OF 48-HOURS PRIOR TO STARTING THE
CONNECTION TO THE NEW WATER SERVICE.
10. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM, SANITARY) THAT CROSS THROUGH
PAVEMENT AREAS.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-402
Project No: 23-4121
30'
Page 747 of 1493
Page 748
6" TOPSOIL (MIN.)
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
DETECTABLE TAPE, 1'-6"
EXCAVATED FROM TRENCH
BACKFILL WITH MATERIAL
BELOW FINISHED GRADE
TRENCH WIDTH DETECTABLE TAPE, 1'-6"
(I.D. + 24") TRENCH WIDTH BELOW FINISHED GRADE
(I.D. + 24")
2
Utica
12" (I.D.) 12"
12" (I.D.) 12"
Buffalo
TOP OF PIPE ZONE
12"
12"
1
1
.
O.D.
IA .
.)
D
O.D.
IA
D
(I.
.)
D
D
(I.
(6"MIN.)
1/3 I.D. (6"MIN.)
(12"MAX.)
1/3 I.D.
(12"MAX.)
NOTES:
NOTES: A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS.
A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS. B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING.
Multifamily Development
B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING.
C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL
PLACEMENT AND MAXIMUM PAY LIMITS.
C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL
PLACEMENT AND MAXIMUM PAY LIMITS. D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL
BE USED IN ALL UNSHEETED TRENCH AREAS.
D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL
BE USED IN ALL UNSHEETED TRENCH AREAS.
1425 & 1475 Orchard Park Rd
UTILITY TRENCH SECTION IN PAVED AREAS
UTILITY TRENCH SECTION
IN UNPAVED AREAS
© CARMINA WOOD DESIGN
West Seneca, NY
Date
No. Description
REVISIONS:
DRAWING NAME:
Utility Details
Date: 5/22/26
Drawn By: A. Pandolfe
Scale: As Noted
DRAWING NO.
C-403
Project No: 23-4121
Page 748 of 1493
Page 749
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
© CARMINA WOOD DESIGN sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
REVISIONS:
Date:
Scale:
No. Description Date
Drawn By:
Multifamily Development
Project No:
DRAWING NO.
1425 & 1475 Orchard Park Rd
DRAWING NAME:
West Seneca, NY
Utility Details
23-4121
C-404
Buffalo Utica Greensboro
Page 749 of 1493
As Noted
5/22/26
A. Pandolfe
Page 750
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
© CARMINA WOOD DESIGN sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
REVISIONS:
Date:
Scale:
No. Description Date
Drawn By:
Multifamily Development
Project No:
DRAWING NO.
1425 & 1475 Orchard Park Rd
DRAWING NAME:
West Seneca, NY
Utility Details
23-4121
C-405
Buffalo Utica Greensboro
Page 750 of 1493
As Noted
5/22/26
A. Pandolfe
Page 751
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
© CARMINA WOOD DESIGN sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
Cleanout in Pavement/Sidewalks
Cleanout in Field/lawn areas
Non Residential and Commercial Projects
Non Residential and Commercial Projects
6" METER & RPZ INSULATED ENCLOSURE
REVISIONS:
Date:
Scale:
No. Description Date
Drawn By:
Multifamily Development
Project No:
DRAWING NO.
1425 & 1475 Orchard Park Rd
DRAWING NAME:
West Seneca, NY
Utility Details
23-4121
C-406
Buffalo Utica Greensboro
Page 751 of 1493
5/22/26
A. Pandolfe
As Noted
Page 752
UE
EX. PIN CB
UE
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
RIM:683.34
G
APPROX. LOCATION
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
W
N. INV:672.94 (18")
ST
Greensboro
S. INV:673.10 (18")
SA
CB
OE
" RIM:680.53
32
UE
8'- N. INV:671.23 (18")
EX 5' N .ST
CB
°-5
G
5.2 32' E OE
0 S. INV:671.23 (18")
.N .
10 RIM:685.39
0W.
AI
N. INV:677.49 (18")
L
87°-09'-45" S. INV:677.49 (16")
E. INV:676.99 (4")
UE
SA G
UE
OR
T MH
LO
W
Utica
T. RIM:685.89
BI
UE
NW. INV:676.14 (12")
CH
SE. INV:676.22 (12")
UE
S W S
1 .0
PP .
G OE
AR
S
SW
SA
'E
T
UE
Buffalo
EX. REBAR
BU
PRO ING F.E.
ILD F.
PO W/A = 68
4.11' N.
SED TT 1.6
D
N
UE
O
1-S ACH 0
TI
TO ED
W
X. UE
CA
RY GA
G E
PA
5-U RAG
LO
O
W
NIT ES
113°-18'-53"
W
O
SA S
PR
RK
UE
W
UE
AP
T
BUILDING W/ATTACHED GARAGES
S
G E
EX. PIN
PROPOSED 1-STORY 4-UNIT
O
W
RO
W W W
F.F.E. = 681.15
IT S
UE
PP 8' E.SA GSW
W UN GE
-4 RA
0.
RY D GA
UE
O
T E
1-S CH 0
BUILDING W/ATTACHED GARAGES
ED TA .8
OS W/AT = 684
A
PROPOSED 1-STORY 4-UNIT
O P
PR ING .F.E.
EX 9' N
W ILD F
OE
UE
D
5.8 /L
S BU
F.F.E. = 680.40
.R .
T
±O
EB
STOP
(6
W
AR
UE
W
UE
6. 0
Multifamily Development
SA SOE
')
OE
UE
UE
W S S PP
G
T
OE PP
OE 1.0' E.
OE
W
OE EX. IP.
14
11
OE
3.8
5°
S PP 7.27' NW.
NW. COR. LOT 417
-0
6'
UE
4'- SA W
PARKING
OE
MS
S
47
STOP LOT
OE
.
S. LINE LOT 369
"
G
W
ST
12"
UE
EX. IP. EA
OE
. AR
N. INV: 660.98 (18" HDPE) BIT
12" 170°-37'-13"
OE
89°-57'-36"
APPROX. LOCATION HYD
CONTRACTOR TO VERIFY LIMITS OF
WG
OF CEMETERY CEMETERY AND NOTIFY DESIGN
SA S
UE
HEAD STONES NOT ENGINEER OF ANY POTENTIAL CONFLICTS S
LOCATED
T OE
127°-49'-44"
1425 & 1475 Orchard Park Rd
14"
28"
14"
UE
EX. IP.
W. INV: 682.97
(12" HDPE)
ST
23"
UE
COM
12"
© CARMINA WOOD DESIGN
PARKING
S. INV: 662.31 (18" HDPE) S
West Seneca, NY
LOT
UE
S S
EX. IP.
.
O/L STOP PART OF &
MS
146°-28'-21" D.
W. LINE LOT 417
1'
UE
L-11442, P-836 29
9.7
W W
UE
38"
W W
UE
BUILDING W/ATTACHED GARAGES
EXCEPTION
COM
30"
PROPOSED 1-STORY 6 UNIT
BUILDING W/ATTACHED GARAGES
149°-26'-50"
L-3327
PROPOSED 1-STORY 6 UNIT
11"
F.F.E. = 682.80
F.F.E. = 682.80
10 24" EX. IP. P-87
PARKING
Date
3. 2.04' NW.
UE
LOT 00
'D
.&
M
S.
SCRUB SHRUB WETLANDS (PSS) 36"
W 33
W
UE
(APPROXIMATE LOCATION) 153°-18'-56" 8.
"
14" 0'
10
D.
6'-
&
°-4
24" M
S.
89
8"
UE
W W
S.
113°-43'-57"
'M
18"
00
No. Description
3.
11
UE
S
COM
REVISIONS:
5"
T
ND
RA
.B
UE
NE
EX. REBAR
LI
S.
N.
M
EXCEPTION
.&
'D
8" 12" 11"
O/L
L-3036
70
2.
12" 6" 8" 12"
26
7" P-217
20" 6"
& 89'
S.
6" 12"
D. 72.
M
6" 13"
6"
0')
EX. IP.
133°-32'-58"
0.
12.33' W.
(7
COM
EX. IP.
3.20' S.
275.56' D. & MS.
AD
87°-23'-54"
RO
20"
N. INV: 669.78 (18" HDPE)
RG
Lighting Plan
BE
SCALE: 1"=50'
DRAWING NAME:
Lighting Plan
Date: 5/22/26
Drawn By: A. Pandolfe
Scale: As Noted
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
50 0 50 100Ft.
LP-100
Project No: 23-4121
50'
Page 752 of 1493
Page 753
ENGINEER’S REPORT
for
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, Erie County, New York
Prepared for
Brian Hillery & William Sahlem
1 Woodthrush Trail
Orchard Park, NY 14127
Prepared by
Carmina Wood Design
80 Silo City Row, Suite 100
Buffalo, NY 14203
Telephone: (716) 842-3165
Fax: (716) 842-0263
May 2026
Page 753 of 1493
Page 754
Table of Contents
Written Engineer’s Report
Section 1 – Location & Description Page 1
Section 2 – Water Service Page 1
Section 3 – Sanitary Sewer Service Page 1
Section 4 – Storm Sewer Service Page 2
Section 5 – Erosion Control Summary Page 3
Section 6 – Geotechnical Items Page 4
Appendices
Appendix A Site Location Map
Appendix B Sanitary Sewer & Water Demand Calculations
Appendix C Downstream Sewer Capacity Analysis Report
Appendix D Storm Water Calculations
Appendix E Soil Information
Page 754 of 1493
Page 755
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 1 of 4
5/26/2026
Section 1 – Location & Description
This new development project involves the construction of three (3) 4-unit, one (1) 5-unit and two (2) 6-
unit ranch style townhomes, for a total of 29 units. Construction will also consist of associated parking,
storm water management, utility, lighting, and landscaping improvements. The site is currently vacant
consisting of grass, brush and tree cover. The total area of the site is 16.59 acres with an area of
disturbance of approximately 7.37 acres. The site has been rezoned to C-1(S) to allow for the development.
See Appendix A for Site Location Map.
Section 2 – Water System
The proposed 6” combined water service will connect to an existing 8” PVC water main located on the west
side of Orchard Park Road. The proposed service will tap the main and enter a heated enclosure where an
RPZ and meter will be provided. The combined service will enter the buildings and reduce to a 2” domestic
service. Two (2) private fire hydrants are proposed to provide fire protection. Drainage from the hotbox
due to testing or failure will be via gravity to the nearest drainage inlet. Water inside the building will be
used for typical bathroom and janitorial uses.
Domestic Summary:
Peak Operating Demand: 87 gpm
Water Main: 8” PVC water main along Orchard Park Road
Static Pressure: 70 psi
Friction Loss: 0.2 psi
Elevation Loss: -2.0 psi
Meter & RPZ Loss: 13 psi
Pressure at furthest unit: 58.8 psi
Fire Summary:
Peak Operating Demand: 1,000 gpm
Water Main: 8” PVC water main along Orchard Park Road
Static Pressure: 70 psi
Friction Loss: 12.6 psi
Elevation Loss: -2.0 psi
Meter & RPZ Loss: 13 psi
Pressure at furthest hydrant: 46.4 psi
Repairs to all devices will be made during off hours; dual backflow preventers are not required. The site is
not located in a 100-year flood plain.
Disinfection of the water service following installation will be continuous feed, according to AWWA C-651,
latest revision.
See Appendix B for Sanitary Sewer & Water Calculations.
Section 3 – Sanitary Sewer Service
The proposed sanitary sewer service will connect to an existing manhole located along the west side of
Orchard Park Road. The proposed service will consist of approximately 691 LF of 8” SDR-35 PVC private
sanitary sewer main at a slope of 0.4%, 346 LF of 6” SDR-35 PVC sanitary sewer lateral at a minimum slope
of 1.0% and 285 LF of 3” SDR-21 PVC force main with a minimum cover of 4’.
Page 755 of 1493
Page 756
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 2 of 4
5/26/2026
Design Parameters:
Multifamily Development: 29 units x 220 gpd/unit = 6,380 gpd
Since the sanitary sewer extension is designed to convey greater than 2,500 gpd, a downstream sewer
capacity analysis was performed to ensure that the existing sewer could handle the additional flow.
The hydraulic loading rates per “Design Standard for Wastewater Treatment Works” 2014, NYSDEC.
See Appendix B for Sanitary Sewer & Water Calculations
See Appendix C for Downstream Sewer Capacity Analysis Report
Section 4 – Storm Sewer Service
The existing site sheet drains from east to west to a USACE jurisdictional wetland area at the rear of the
site.
The proposed development will replicate the existing hydrology of the site. The proposed hydrology for the
development project area will consist of overland sheet flow and pipe channel flow. The storm sewer
system for this site will consist of 6”, 8” and 12” HDPE pipes connected by a series of catch basins and yard
drains. Stormwater runoff generated from the site will enter the pipe network and be conveyed to a
detention basin on the west side of the site. The detention basin will discharge runoff, at a controlled rate,
to the existing wetlands. To meet NYSDEC water quality requirements, runoff will be conveyed to a
bioretention areas prior to the detention basin. Runoff that is currently being discharged on to the site
from the church parking lot to the east will be collected and piped to the west side of the site.
Design Criteria
Storm pipes: 10-year storm
Detention: Comparison of the existing 1-year vs. the proposed 1-year runoff.
Comparison of the existing 10-year vs. the proposed 10-year runoff.
Comparison of the existing 10-year vs. the proposed 25-year runoff.
Comparison of the existing 100-year vs. the proposed 100-year runoff.
Stormwater Runoff Summary:
To Detention:
Event Prop. Runoff (cfs) Elevation (ft) Storage (cf)
1-yr 1.94 671.04 5,335
10-yr 2.82 672.95 15,013
25-yr 3.10 673.70 21,268
100-yr 3.45 674.73 34,966
Direct:
Event Prop. Runoff (cfs)
1-yr 0.38
10-yr 1.12
25-yr 1.57
100-yr 2.52
Total Site:
Event Ex. Runoff (cfs) Prop. Runoff (cfs)
1-yr 2.63 2.32
10-yr 8.17 3.94
25-yr 11.66 4.67
100-yr 18.97 5.97
Page 756 of 1493
Page 757
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 3 of 4
5/26/2026
See Appendix D for Storm Water Calculations
Section 5 – Erosion Control Summary
Stabilization Practices
Stabilization practices for this site include:
A. Land clearing activities shall be done only in areas where earthwork will be performed and shall
progress as earthwork is needed.
B. Use of stabilization fabric for all slopes having a slope greater than 1V:3H.
C. Permanent seeding and planting of all unpaved areas using the hydromulching grass seeding
technique.
D. Mulching exposed areas.
E. Frequent watering to minimize wind erosion during construction.
Structural Practices
Structural practices for this site include:
A. Inlet protection using a method detailed in the Construction Documents
B. Perimeter protection using temporary silt fence
C. Temporary stone wash off areas
Sequence of Major Activities
The Contractor will be responsible for implementing the following erosion control and storm water
management control measures. The Contractor may designate these tasks to certain subcontractors as he
sees fit, but the ultimate responsibility for implementing these controls and ensuring their proper
functioning remains with the Contractor. The order of activities will be as follows:
A. Construct temporary construction exit at location shown on the Demo & Erosion Control Plan Sheet.
B. Install perimeter silt fences in the locations shown on the Demo & Erosion Control Plan sheet.
C. Clear and grub site within disturbance (silt fence) limits.
D. Installation of detention basin to act as sediment basin (do not install bioretention soil or underdrains
until stabilized)
E. Commence site grading.
F. Disturbed areas of the site where construction activity has ceased for more than 14 days shall be
temporarily seeded and watered.
G. Construction of buildings.
H. Installation of proposed utilities.
I. Finalize pavement subgrade preparation.
J. Construct all curb, drainage inlets, storm sewer pipes and storm sewer manholes, as shown on the
plans. Install temporary inlet protection at the locations of all new inlets.
K. Dust control.
L. Remove inlet protection around inlets and manholes no more than 48 hours prior to placing stabilized
base course.
M. Install base material as required for pavement.
N. Carry out final grading and seeding and planting.
O. Clean storm system following construction.
P. Remove silt fencing only after all paving is complete and exposed surfaces are stabilized.
Page 757 of 1493
Page 758
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 4 of 4
5/26/2026
Section 6 – Geotechnical Items
According to the USDA Web Soil Survey, the onsite soil is made up of Darien silt loam, Niagara silt loam and
Remsen silty clay loam. These soils are categorized under hydrologic soil groups C/D and D and will have a
slow infiltration rate when thoroughly wet.
See Appendix D for Soil Information.
Page 758 of 1493
Page 759
Appendix A
Site Location Map
Page 759 of 1493
Page 760
Site Location Map
Page 760 of 1493
Page 761
Appendix B
Sanitary Sewer & Water Demand Calculations
Page 761 of 1493
Page 762
CARMINA WOOD DESIGN Project No.: 23-4121 Date: 5/22/2026
80 Silo City Row, Suite 100 Project Name: Multifamily Development
Buffalo, New York 14203 Project Address: 1425-1475 Orchard Park Road - West Seneca
(716) 842-3165 Subject: Sanitary Sewer Demand Calcs
FAX (716) 842-0263 Sheet: 1 of 1
Sanitary Sewage Demand Calculations:
Proposed Townhomes
220 gal/d/unit x 29 units = 6,380 gpd *use 220 gallons per unit per day (2-bdrm)
Find Peak Sanitary Demand:
Peaking Factor based on Population:
Total demand: 6,380 gpd / 51.96 gpcd = 123 per capita
Population (P) = 123 people
Peaking Factor : (18 +√P) / (4 + √P ) where P is in thousands
Peaking Factor = 4.22
Peak Sanitary Demand = 6,380 x 4.22 = 26,911 gpd
= 0.027 MGD
= 0.042 cfs
Required Infiltration and Inflow Mitigation:
Mitigation Fee = $2.40 /gal = $15,312.00
Page 762 of 1493
Page 763
Carmina Wood Design Project No.: 23-4121 Date: 5/18/2026
80 Silo City Row, Suite 100 Project Name: Multifamily Development
Buffalo, NY 14203 Project Address: 1475 Orchard Park Road - Town of West Seneca
(716) 842-3165 Subject: Sanitary Sewage Pump Station Design
FAX (716) 842-0263 Sheet: 1 of 1
Sanitary Sewage Demand Calculations:
Proposed Apartments
220 gpd/unit x 25 units = 5,500 gpd
Average Site Sanitary Flow: = 5,500 gpd
Peak Site Sanitary Flow: = 22,000 gpd
PF = 4.0
* assume flow over 18 hour period
Peak Site Sanitary Flow: = 20.4 gpm
8" inlet into pump station invert: 670.68
Forcemain invert at tie into downstream sewer: 676.55
Pump chamber diameter: 5 ft ( 147 gal/ft)
Storge required:
* use filling time of 30 minutes @ 20.4 gpm (peak flow)
Storage required = 20.4 gpm x 30 mins = 4.16 ft
147 gal
Top of pump station: 682.40
Inlet & Alarm: 670.68
2 pumps on: 670.18 (inlet minus 0.5 ft)
1 pump on: 669.68 (2 pumps on minus 0.5 ft)
pumps off: 665.52 (1 pump on minus storage required)
Bottom of station: 664.27 (pumps off minus 1.15 ft)
Total depth: 18.13 ft
Cleansing velocity:
Using a 3 inch forcemain, find flow for min 2 fps cleansing velocity
A= 0.05 ft2
2
Q=VxA= 2 fps x 0.05 ft = 0.09817 cfs = 44.1 gpm
Page 763 of 1493
Page 764
CARMINA WOOD DESIGN Project No.: 23-4121 Date: 5/22/2026
80 Silo City Row, Suite 100 Project Name: Multifamily Development
Buffalo, New York 14203 Project Address: 1425-1475 Orchard Park Road - West Seneca
(716) 842-3165 Subject: Water Demand Calcs
FAX (716) 842-0263 Sheet: 1 of 1
Water Demand Calculations (domestic):
Townhome Development:
Q = 3 gpm/unit x 29 units = 87 gpm ECDOH Requirement
Water Demand Calculations (fire):
Q= 1500 gpm * per ISO Guidelines
Elev. at ex. residual hydrant = 684.5 ft
Static pressure at ex. hydrant = 70 psi
El. @ road tap = 684.5 ft
Δ elev ex. hydrant to road tap = 0 ft = 0.0 psi (positive is decrease in pressure from static)
(negative is increase in pressure from static)
Static pressure at road tap = 70.0 psi
El. @ furthest building = 679.9 ft
Δ elev road tap to furthest building = -4.6 ft = -2.0 psi (positive is decrease in pressure from static)
(negative is increase in pressure from static)
Find residual at furthest unit using domestic flow:
Headlosses:
Qpeak = 87.0 gpm
Pipe = 6 inch PVC C = 150
Length = 646 LF (approx. distance from tap to furthest building)
10.44 L Q1.85 10.44(646)(87)1.85
HL = 1.85 4.866 = = 0.40 ft = 0.2 psi
C D (150)1.85 (6)4.866
Loss through 6-inch RPZ & meter = 13 psi
Residual pressure at furthest unit = Static pressure at road tap - headlosses - Δ elev
=70.0 - 0.2 - 13 - (-2)
= 58.8 psi
Find residual at furthest hydrant using fire flow:
Headlosses:
Qpeak = 1000 gpm
Pipe = 6 inch PVC C = 150
Length = 509 LF (approx. distance from tap to furthest hydrant)
10.44 L Q1.85 10.44(509)(1000)
1.85
HL = 1.85 4.866 = 1.85 4.866 = 29.05 ft = 12.6 psi
C D (150) (6)
Loss through 6-inch RPZ = 13 psi
Residual pressure at furthest unit = Static pressure at road tap - headloss - Δ elev
= 70.0 - 12.6 - 13 - (-2)
= 46.4 psi
Page 764 of 1493
Page 765
Appendix C
Downstream Sewer Capacity Analysis Report
Page 765 of 1493
Page 766
TOWN OF WEST SENECA
TOWN SUPERVISOR
GARY A. DICKSON
TOWN COUNCIL
JEFF PIEKAREC
ENGINEERING DEPARTMENT SCOTT ROBERTSON
ROBERT BREIDENSTEIN
MARY SHERMAN
1/6/2026
Jeffrey Scheiber
Code Enforcement Officer
Town of West Seneca
Re: Proposed Townhouses (1425 Orchard Park Road)
Sanitary Sewer Capacity Analysis (Revised December 2025)
Dear Mr. Schieber,
In January 2025, the Town Board approved the discharge of sanitary sewage flow from the proposed
developments at 1425 Orchard Park Road and 1130 Orchard Park Road into the Town’s existing 10” sewer
main located along Orchard Park Road which is part of the Town’s Sewer District 13.
At that time, the proposed average daily flow from 1425 Orchard Park Road development was calculated to
be 7,040 gallons per day. This volume was based on a total of (32) 2-bedroom apartments, assuming 110
gallons per day per bedroom.
PROPOSED CHANGES:
The developer is now proposing to construct twenty-nine (29) 2-bedroom townhouses instead of the
apartment units, which has reduced the proposed sewage flow from 7,040 gallons per day to 6,380 gallons
per day, assuming 110 gallons per day per bedroom.
CONCLUSION:
Since the proposed sewer flow for the twenty nine, 2 bedroom townhouses is less than the previously
approved apartments, I have no additional concerns with the capacity of the sewer.
SEWER MITIGATION FEE
Please note in July 2024 the Town increased the cost per gallon for the sewer mitigation fee from
$1.20/gallon to $2.40/gallon. The original application was submitted prior to that date but the revised
project for 1425 Orchard Park Road was submitted after the fee changed, so I am proposing to utilize the
new fee to calculate the total amount for the revised project as follows:
TOWN HALL 1250 UNION ROAD· WEST SENECA. NEW YORK 14224 • (716) 558-3220 • FAX (716) 677-5448
www.westseneca.net
Page 766 of 1493
Page 767
1425 Orchard Park Road:
6,380 GPD (increase of average daily flow)
x $2.40 ($/gallon)
$15,312
A sewer mitigation fee, as calculated above, should be collected by your office and applied toward the sewer
repair fund for Sewer District 13.
Very truly yours,
Jason A. Foote, P.E.
Town Engineer
cc: Files:
Chris Trapp, Town Attorney
Supervisor Dickson and Town Board Members
TOWN HALL 1250 UNION ROAD· WEST SENECA. NEW YORK 14224 • (716) 558-3220 • FAX (716) 677-5448
www.westseneca.net
Page 767 of 1493
Page 768
DOWNSTREAM SANITARY SEWER CAPACITY
ANALYSIS REPORT
for
Proposed Apartments
1425 Orchard Park Road
Town of West Seneca, Erie, NY
Prepared for
William Sahlem and Brian Hillery
1 Woodthrush Trail,
Orchard Park, NY 14127
Prepared by
Carmina Wood Design
487 Main Street, Suite 500
Buffalo, NY 14203
Telephone: (716) 842-3165
Fax: (716) 842-0263
December 2023
Page 768 of 1493
Page 769
Project Description
This project is a development of a 3.17 acre +/- site located on the west side of Orchard Park Road in the Town of
West Seneca. The property will be developed with (26) 2-bedroom apartment units and (4) 3-bedroom apartment
units. This analysis will also include the recently approved multi-family project at 1130 Orchard Park Road (45 2-
bedroom units).
The proposed sewer service for this development will connect to an existing 10” Town of West Seneca sewer main
the runs along the west side of Orchard Park Road.
Node 1 – 1001 Orchard Park Rd (12”):
Existing Peak Flow measured (wet weather event) = 2.844 cfs (1.838 mgd)*
Proposed Apartments Peak Flow (Flattery’s) = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road) = 0.046 cfs**
Proposed Total Peak Flow = 2.955 cfs
Theoretical capacity of existing 12” pipe @ 0.36% = 2.314 cfs
Conclusion: Monitored flows the day following the 0.72” rainfall event exceeded the capacity of the existing pipe
12” sewer. One time during the monitoring period the flow depth exceeded the pipe diameter at Node 1, but at
no time during the monitoring period did the flow at any point slow or stall which would have caused a backup or
flooding at the manhole. The 12” sewer receives surcharges from a 27” sewer and 36” sewer downstream during
high rainfall events. Outside of these events, the 12” sewer has ample capacity to handle the additional proposed
total peak flow. I/I mitigation shall be required for the contribution proposed for this project.
Node 2 – Orchard Park Rd (15”):
Existing Peak Flow measured (wet weather event) = 2.917 cfs (1.885 mgd)*
Proposed Apartments Peak Flow (Flattery’s) = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road) = 0.046 cfs**
Proposed Total Peak Flow = 3.028 cfs
Theoretical capacity of existing 15” pipe @ 0.34% = 4.077 cfs
Conclusion: The proposed total peak flow is less than the capacity of the 15” pipe, therefore there is sufficient
capacity. One time during the monitoring period the flow depth exceeded the pipe diameter at Node 2, but at no
time during the monitoring period did the flow at any point slow or stall which would have caused a backup or
flooding at the manhole. The 15” sewer receives surcharges from a 27” sewer and 36” sewer downstream during
high rainfall events. Outside of these events, the 15” sewer has ample capacity to handle the additional proposed
total peak flow. I/I mitigation shall be required for the contribution proposed for this project.
Proposed Apartments
10/3/2022
Page 1 of 2
Page 769 of 1493
Page 770
Node 3 – Orchard Park Rd & Fairfax (48”):
Existing Peak Flow measured (wet weather event) = 14.470 cfs (9.352 mgd)*
Proposed Apartments Peak Flow (Flattery’s) = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road) = 0.046 cfs**
Proposed Total Peak Flow = 14.581 cfs
Existing Peak Flow measured (overall) = 16.150 cfs (10.438 mgd)*
Proposed Apartments Peak Flow (Flattery’s) = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road) = 0.046 cfs**
Proposed Total Peak Flow = 16.261 cfs
Theoretical capacity of existing 48” pipe @ 0.15% = 60.218 cfs
Conclusion: The proposed total peak flow is less than the capacity of the 48” pipe, therefore there is sufficient
capacity. At no time during the monitoring period did flow depth exceed the pipe diameter at Node 3 of the
downstream monitoring points during the rain events monitored.
Foot Notes:
Downstream capacity node information provided by Town of West Seneca
*Converted from measurements in TECSmith report dated 9/15/22 & 4/19/22
** See Sanitary Sewage Demand Calculations
Proposed Apartments
10/3/2022
Page 2 of 2
Page 770 of 1493
Page 771
Location Map
Page 771 of 1493
Page 772
Page 772 of 1493
Page 773
Sanitary Demand Calculations
Page 773 of 1493
Page 774
CARMINA WOOD DESIGN Project No.: 23-4121 Date: 12/11/2023
487 MAIN STREET, SUITE 500 Project Name: Proposed Apartment Development
BUFFALO, NEW YORK, 14203 Project Address: 1425 Orchard Park Road
(716) 842-3165 Subject: I & I Mitigation
FAX (716) 842-0263 Sheet: 1 of 1
Sanitary Sewage Demand Calculations:
Proposed Development
220 gal/d/unit x 26 units = 5,720 gpd *use 220 gal/d/unit (2-bdrm apt)
330 gal/d/unit x 4 units = 1,320 gpd *use 330 gal/d/unit (3-bdrm apt)
Total Site Sanitary Demand: = 7,040 gpd
Find Peak Sanitary Demand:
Peaking Factor based on Population:
Total demand: 7,040 gpd / 52 gpcd = 135 per capita
Population (P) = 135 people
Peaking Factor : (18 +√P) / (4 + √P ) where P is in thousands
Peaking Factor = 4.21
Peak Sanitary Demand = 7,040 x 4.21 = 29,604 gpd
= 0.030 MGD
= 0.046 cfs
Required Infiltration and Inflow Mitigation:
Total Sanitary Flow = 7,040 gpd
Mitigation Credit = $1.20 / gpm (Town of West Seneca)
Mitigation Agreement Amount = $8,448.00
Page 774 of 1493
Page 775
CARMINA WOOD DESIGN Project No.: 22.128 Date: 10/3/2022
487 MAIN STREET, SUITE 500 Project Name: Residential Apartments
BUFFALO, NEW YORK, 14203 Project Address: 1130 Orchard Park Road West Seneca, NY
(716) 842-3165 Subject: Sanitary Sewer Demand Calcs
FAX (716) 842-0263 Sheet: 1 of 1
Sanitary Sewage Demand Calculations:
Proposed Apartments
220 gal/d/unit x 45 units = 9,900 gpd *use 220 gallons per unit per day (2-bdrm)
Total Site Sanitary Demand: = 9,900 gpd
Find Peak Sanitary Demand:
Peaking Factor based on Population:
Total demand: 9,900 gpd / 100 gpcd = 99 per capita
Population (P) = 99 people
Peaking Factor : (18 +ÖP) / (4 + ÖP ) where P is in thousands
Peaking Factor = 4.24
Peak Sanitary Demand = 9,900 x 4.24 = 42,023 gpd
= 0.042 MGD
= 0.065 cfs
Required Infiltration and Inflow Mitigation:
Peak Sanitary Flow = 42,023 gpd = 29.18 gpm
4:1 offset flow per NYSDEC requirements = 29.18 x 4 = 116.73 gpm req'd
Mitigation Credit = 30 gpm / lateral
Laterals to be replaced* = 3.9 laterals
= 4 laterals *(or other mitigation as identified by the Town)
From DSCA for Multi-family project
at 1130 Orchard Park Road
Page 775 of 1493
Page 776
TECSmith Monitoring Report
Page 776 of 1493
Page 777
Date Node 1 Node 2 Rain 2 Date Node 3 Rain 2 Snow
1001 Orchard Park Rd (12") Orchard Park Rd 15" (15") Orchard Park Rd & Fairfax (48")
FLOW PEAK FLOW PEAK FLOW PEAK FLOW PEAK (inches) FLOW PEAK FLOW PEAK (inches) (inches)
(GAL x 1,000) (MGD) LEVEL (IN) (GAL x 1,000) (MDG) LEVEL (IN) (GAL x 1,000) (MDG) LEVEL (IN)
8/16/2022 89.257 0.440 5.964 168.586 0.721 4.437 0.23 3/17/2022 3196.614 6.783 13.938 0 0
8/17/2022 215.037 0.376 4.744 438.779 0.622 3.770 0 3/18/2022 5684.090 6.485 13.639 0 0
8/18/2022 189.150 0.370 4.686 427.549 0.628 3.826 0 3/19/2022 6314.024 7.874 17.857 0.27 0
8/19/2022 185.188 0.342 4.512 414.203 0.666 4.069 0 3/20/2022 7506.892 9.168 20.985 0.08 0
8/20/2022 202.299 0.331 4.923 396.354 0.689 4.133 0 3/21/2022 6601.632 8.220 19.365 0 0
8/21/2022 242.472 0.443 5.850 452.414 0.758 4.278 0.11 3/22/2022 5911.885 6.708 14.066 0 0
8/22/2022 211.005 0.478 4.897 492.229 0.645 3.891 0.14 3/23/2022 6366.253 9.352 21.857 0.51 0
8/23/2022 205.428 0.447 4.517 162.364 0.422 3.395 0.05 3/24/2022 8410.107 10.438 23.577 0 0
8/24/2022 203.451 0.394 4.725 253.953 0.604 4.307 0.45 3/25/2022 7059.230 8.020 19.386 0 0
8/25/2022 181.878 0.416 4.675 439.324 0.669 4.150 0 3/26/2022 7112.401 8.489 19.148 0.09 0.1
8/26/2022 190.142 0.419 4.851 414.269 0.625 3.883 0 3/27/2022 7001.414 8.461 18.753 0.06 2.3
8/27/2022 177.502 0.405 4.759 424.759 0.670 4.011 0 3/28/2022 6396.917 7.538 17.111 0.01 0.4
8/28/2022 149.262 0.306 4.729 402.881 0.700 4.187 0 3/29/2022 5909.058 6.957 14.053 0 0
8/29/2022 131.545 0.272 4.563 409.867 0.776 4.384 0 3/30/2022 5521.696 6.653 13.811 0.01 0
8/30/2022 277.592 0.705 7.523 530.810 1.126 5.440 0.97 3/31/2022 5943.213 7.661 16.548 0.09 0
8/31/2022 207.872 0.351 5.185 507.470 0.687 4.085 0 4/1/2022 5419.635 6.277 14.053 0.06 0.1
9/1/2022 185.028 0.361 5.419 434.561 0.610 3.756 0 4/2/2022 5147.186 6.140 13.371 0 0
9/2/2022 157.770 0.346 4.843 411.119 0.619 3.892 0 4/3/2022 5083.174 6.186 13.093 0.01 0
9/3/2022 147.788 0.355 5.089 391.309 0.645 4.003 0 4/4/2022 4946.766 6.325 12.723 0 0
9/4/2022 166.764 0.303 4.897 378.377 0.635 3.860 0.04 4/5/2022 4901.882 5.708 12.382 0 0
9/5/2022 464.216 1.838 32.342 716.100 1.885 64.943 0.72 4/6/2022 4842.495 5.943 12.848 0.21 0
9/6/2022 241.691 0.307 5.076 505.569 0.654 4.013 0 4/7/2022 7751.294 9.369 21.493 0.25 0
9/7/2022 190.037 0.354 5.440 449.703 0.749 4.317 0.01 4/8/2022 7000.725 8.355 18.804 0 0
9/8/2022 182.211 0.372 4.852 443.591 0.642 3.912 0 4/9/2022 6041.826 7.017 13.864 0 0
9/9/2022 180.567 0.332 5.309 426.468 0.702 4.143 0 4/10/2022 5473.970 6.521 13.216 0 0
9/10/2022 169.443 0.373 5.192 428.528 0.686 4.058 0 4/11/2022 5257.193 7.976 15.138 0.13 0
9/11/2022 98.925 0.532 6.704 397.027 0.919 4.930 0.03 4/12/2022 7299.038 9.109 16.993 0.14 0
9/12/2022 336.528 0.958 8.256 552.252 1.290 5.735 0.28 4/13/2022 6134.522 7.267 14.479 0.05 0
9/13/2022 356.909 0.736 6.372 589.969 0.876 4.687 0.14 4/14/2022 3692.282 6.917 14.240 0 0
9/14/2022 112.265 0.350 5.193 258.683 0.696 4.002 0 ‐‐‐ --- --- --- --- ---
--- --- --- --- --- --- --- 3.17 --- --- --- --- 1.97 2.9
MGD CFS MGD CFS MGD CFS
Wet 1.838 2.844 Wet 1.885 2.917 Wet 9.352 14.470
Dry 0.958 1.482 Dry 1.290 1.996 Dry 10.438 16.150
`
Page 777 of 1493
Page 778
TECsmith
TECSMITH, Inc.
PO Box 95
Clarence, NY 14031
Tel: 716-462-0382
Date: September 15, 2022
SANITARY SEWER FLOW CAPACITY STUDY – Summary Review
Prepared For: 1130 Orchard Park Road Capacity Analysis
R. Christopher Wood, PE Partner
487 Main Street, Suite 500
Buffalo, New York 14203
Project Name: 1130 Orchard Park Road Capacity Analysis
Flow Monitoring Period: August 16, 2022 to September 14, 2022
Rain Events (> 0.5-inches) Monitored: August 30 (0.97”), and September 5 (0.72”)
Number of Monitoring Nodes: Two (2) downstream manholes
Node Locations and Descriptions:
• Node 1 1001 Orchard Park Rd (12”)
• Node 2 Orchard Park Rd 15" (15”)
Summary Conclusion:
Based on the data presented in this report, specifically the flow depth measurements recorded
(see graphs below)
• One time the flow depth exceeds pipe diameter at all nodes of the downstream
monitoring points during the wet weather events monitored.
water and wastewater monitoring specialists
Page 778 of 1493
Page 779
7(&smith
7(&60,7+,QF
32%R[
(OPD1HZ<RUN
7HO
)D[
'DWH$SULO
6$1,7$5<6(:(5)/2:&$3$&,7<678'<±6XPPDU\5HYLHZ
3UHSDUHG)RU2UFKDUG3DUN5RDG&DSDFLW\$QDO\VLV
5&KULVWRSKHU:RRG3(3DUWQHU
0DLQ6WUHHW6XLWH
%XIIDOR1HZ<RUN
3URMHFW1DPH2UFKDUG3DUN5RDG&DSDFLW\$QDO\VLV
)ORZ0RQLWRULQJ3HULRG0DUFKWR$SULO
5DLQ(YHQWV !LQFKHV 0RQLWRUHG0DUFK ´
1XPEHURI0RQLWRULQJ1RGHV7KUHH GRZQVWUHDPPDQKROHV
1RGH/RFDWLRQVDQG'HVFULSWLRQV
x 1RGH0DUWKD 3DUN 5G
2UFKDUG
x 1RGH :DUQHU
2UFKDUG 3DUN 5G
x 1RGH 7UDQVLW5RDG
2UFKDUG 3DUN 5G
)DLUID[
6XPPDU\&RQFOXVLRQ
%DVHGRQWKHGDWDSUHVHQWHGLQWKLVUHSRUWVSHFLILFDOO\WKHIORZGHSWKPHDVXUHPHQWVUHFRUGHG
VHHJUDSKVEHORZ
x 2QHWLPHWKHIORZGHSWKH[FHHGVSLSHGLDPHWHUDW1RGHRIWKHGRZQVWUHDPPRQLWRULQJ
SRLQWVGXULQJWKHZHWZHDWKHUHYHQWVPRQLWRUHG
x 7ZRWLPHVWKHIORZGHSWKH[FHHGVSLSHGLDPHWHUDW1RGHRIWKHGRZQVWUHDPPRQLWRULQJ
SRLQWVGXULQJWKHZHWZHDWKHUHYHQWVPRQLWRUHG
x $WQRWLPHWKHIORZGHSWKH[FHHGVSLSHGLDPHWHUDW1RGHRIWKHGRZQVWUHDPPRQLWRULQJ
SRLQWVGXULQJWKHZHWZHDWKHUHYHQWVPRQLWRUHG
water and wastewater monitoring specialists
Page 779 of 1493
Page 780
TECsmith
TECSMITH, Inc.
PO Box 95
Clarence, NY 14031
Tel: 716-462-0382
Depth of Flow Capacity Summary:
Depth of flow capacity is based on diameter of pipe. See graphs below.
• One time during the monitoring period did depth of flow exceed pipe diameter at Node 1.
Node 1
35
30
25
Level and Pipe Size
20
15
10
5
0
17-Aug-22
18-Aug-22
19-Aug-22
20-Aug-22
20-Aug-22
21-Aug-22
22-Aug-22
23-Aug-22
24-Aug-22
25-Aug-22
25-Aug-22
26-Aug-22
27-Aug-22
28-Aug-22
29-Aug-22
30-Aug-22
30-Aug-22
31-Aug-22
1-Sep-22
2-Sep-22
3-Sep-22
4-Sep-22
4-Sep-22
5-Sep-22
6-Sep-22
7-Sep-22
8-Sep-22
9-Sep-22
9-Sep-22
10-Sep-22
11-Sep-22
12-Sep-22
13-Sep-22
14-Sep-22
Level Pipe Size (in.)
water and wastewater monitoring specialists
Page 780 of 1493
Page 781
•
Level and Pipe Size
10
20
30
40
50
60
70
0
17-Aug-22
18-Aug-22
19-Aug-22
19-Aug-22
TECsmith
20-Aug-22
21-Aug-22
22-Aug-22
22-Aug-22
23-Aug-22
24-Aug-22
25-Aug-22
26-Aug-22
26-Aug-22
27-Aug-22
28-Aug-22
Level
29-Aug-22
29-Aug-22
30-Aug-22
Node 2
31-Aug-22
1-Sep-22
2-Sep-22
Pipe Size
2-Sep-22
3-Sep-22
water and wastewater monitoring specialists
4-Sep-22
5-Sep-22
6-Sep-22
6-Sep-22
7-Sep-22
8-Sep-22
9-Sep-22
9-Sep-22
10-Sep-22
11-Sep-22
One time during the monitoring period did depth of flow exceed pipe diameter at Node 2.
12-Sep-22
13-Sep-22
13-Sep-22
PO Box 95
Clarence, NY 14031
TECSMITH, Inc.
Tel: 716-462-0382
Page 781 of 1493
Page 782
>ĞǀĞůĂŶĚWŝƉĞ^ŝnjĞ
ϭϬ
ϮϬ
ϯϬ
ϰϬ
ϱϬ
ϲϬ
Ϭ
ϭϳͲDĂƌͲϮϮ
ϭϴͲDĂƌͲϮϮ
ϭϵͲDĂƌͲϮϮ
ϭϵͲDĂƌͲϮϮ
ϮϬͲDĂƌͲϮϮ
7(&smith
ϮϭͲDĂƌͲϮϮ
ϮϮͲDĂƌͲϮϮ
ϮϮͲDĂƌͲϮϮ
ϮϯͲDĂƌͲϮϮ
ϮϰͲDĂƌͲϮϮ
ϮϱͲDĂƌͲϮϮ
ϮϱͲDĂƌͲϮϮ
ϮϲͲDĂƌͲϮϮ
ϮϳͲDĂƌͲϮϮ
ϮϴͲDĂƌͲϮϮ
ϮϵͲDĂƌͲϮϮ
>ĞǀĞů
ϮϵͲDĂƌͲϮϮ
ϯϬͲDĂƌͲϮϮ
ϯϭͲDĂƌͲϮϮ
EŽĚĞϯ
ϭͲƉƌͲϮϮ
ϭͲƉƌͲϮϮ
WŝƉĞ^ŝnjĞ
ϮͲƉƌͲϮϮ
ϯͲƉƌͲϮϮ
ϰͲƉƌͲϮϮ
water and wastewater monitoring specialists
ϰͲƉƌͲϮϮ
ϱͲƉƌͲϮϮ
ϲͲƉƌͲϮϮ
ϳͲƉƌͲϮϮ
ϴͲƉƌͲϮϮ
ϴͲƉƌͲϮϮ
ϵͲƉƌͲϮϮ
ϭϬͲƉƌͲϮϮ
ϭϭͲƉƌͲϮϮ
ϭϭͲƉƌͲϮϮ
x $WQRWLPHGXULQJWKHPRQLWRULQJSHULRGGLGGHSWKRIIORZH[FHHGSLSHGLDPHWHUDW1RGH
ϭϮͲƉƌͲϮϮ
ϭϯͲƉƌͲϮϮ
ϭϰͲƉƌͲϮϮ
(OPD1HZ<RUN
7HO
7(&60,7+,QF
)D[
32%R[
Page 782 of 1493
Page 783
Sewer Node Maps
Page 783 of 1493
Page 784
Page 784 of 1493
Page 785
Page 785 of 1493
Page 786
Page 786 of 1493
Page 787
Appendix D
Storm Water Calculations
Page 787 of 1493
Page 788
Calculate Water Quality Volume
Is this project subject to Section 4.3 of the NYS Design Manual for Enhanced Phosphorus
Removal? No
What is the nature of this construction project? New Construction
Design Point: 1
Enter 90% Rainfall Event as P
P= 1.00 inches
Calculate Required WQv
Contributing Percent
Drainage Area Impervious Area WQv SMP
Area Impervious Rv
Number (Acres) (cf) Description
(Acres) %
Filtration
1 3.66 1.89 52 0.51 6,839
Bioretention
Filtration
2 2.16 1.07 50 0.50 3,888
Bioretention
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Total 5.82 2.96 51 0.51 10727 Required WQv
Page 788 of 1493
Page 789
Calcuate Minimum RRv Required
Enter the Soils Data for the site
Hydrologic Soil
Acres S
Group
A 55%
B 40%
C 30%
D 2.96 20%
Total Area 2.96
Calculate the Minimum RRv
S= 0.20
Impervious = 2.96 acres
Precipitation 1.00 inches
Rv 0.95
Minimum RRv 0.047 af
2047 cf
Page 789 of 1493
Page 790
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
1 3.66 1.89 52 0.51 6,839 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) >2
Enter depth to bedrock (ft) >2
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 15
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 2850 sf
Enter Provided Filter Area Af 2855 sf
Recalculated Water Quality Volume (based on
WQv calc 6852 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 2,741 cf
This is the portion of the WQv that is not reduced in
WQv Treated 4098 cf
the practice.
Page 790 of 1493
Page 791
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
2 2.16 1.07 50 0.50 3,888 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) >2
Enter depth to bedrock (ft) >2
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 15
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 1620 sf
Enter Provided Filter Area Af 1705 sf
Recalculated Water Quality Volume (based on
WQv calc 4092 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 1,637 cf
This is the portion of the WQv that is not reduced in
WQv Treated 2251 cf
the practice.
Page 791 of 1493
Page 792
Filtration Bioretention (F-5)
Total Area 5.82 acres
Total Impervious 3 acres
Total RRv Provided 4,378 cf
Total WQv Provided 6,349 cf
Page 792 of 1493
Page 793
1S
Existing - North
2S
Existing - South
Subcat Reach Pond Link Routing Diagram for 23-4121 storm calcs - Existing
Prepared by Carmina Wood Design, Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC
Page 793 of 1493
Page 794
23-4121 storm calcs - Existing
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-Year Type II 24-hr Default 24.00 1 1.87 2
2 10-Year Type II 24-hr Default 24.00 1 3.14 2
3 25-Year Type II 24-hr Default 24.00 1 3.84 2
4 100-Year Type II 24-hr Default 24.00 1 5.23 2
Page 794 of 1493
Page 795
23-4121 storm calcs - Existing
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (all nodes)
Area CN Description
(sq-ft) (subcatchment-numbers)
225,751 80 Pasture/grassland/range, Good, HSG D (1S, 2S)
49,422 79 Woods/grass comb., Good, HSG D (1S)
275,173 80 TOTAL AREA
Page 795 of 1493
Page 796
23-4121 storm calcs - Existing
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (all nodes)
Area Soil Subcatchment
(sq-ft) Group Numbers
0 HSG A
0 HSG B
0 HSG C
275,173 HSG D 1S, 2S
0 Other
275,173 TOTAL AREA
Page 796 of 1493
Page 797
23-4121 storm calcs - Existing
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 5
Ground Covers (all nodes)
HSG-A HSG-B HSG-C HSG-D Other Total Ground
(sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) Cover
0 0 0 225,751 0 225,751 Pasture/grasslan
d/range, Good
0 0 0 49,422 0 49,422 Woods/grass
comb., Good
0 0 0 275,173 0 275,173 TOTAL AREA
Page 797 of 1493
Page 798
23-4121 storm calcs - Existing Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 6
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing - North Runoff Area=181,234 sf 0.00% Impervious Runoff Depth=0.48"
Flow Length=806' Tc=28.2 min CN=80 Runoff=1.59 cfs 7,325 cf
Subcatchment 2S: Existing - South Runoff Area=93,939 sf 0.00% Impervious Runoff Depth=0.48"
Flow Length=362' Slope=0.0370 '/' Tc=20.1 min CN=80 Runoff=1.04 cfs 3,797 cf
Total Runoff Area = 275,173 sf Runoff Volume = 11,121 cf Average Runoff Depth = 0.48"
100.00% Pervious = 275,173 sf 0.00% Impervious = 0 sf
Page 798 of 1493
Page 799
23-4121 storm calcs - Existing Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment 1S: Existing - North
Runoff = 1.59 cfs @ 12.25 hrs, Volume= 7,325 cf, Depth= 0.48"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
131,812 80 Pasture/grassland/range, Good, HSG D
49,422 79 Woods/grass comb., Good, HSG D
181,234 80 Weighted Average
181,234 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
16.9 150 0.0400 0.15 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
5.2 287 0.0170 0.91 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
4.0 284 0.0280 1.17 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
2.1 85 0.0180 0.67 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
28.2 806 Total
Subcatchment 1S: Existing - North
Hydrograph
Runoff
1.59 cfs
Type II 24-hr
1-Year Rainfall=1.87"
Runoff Area=181,234 sf
Runoff Volume=7,325 cf
Flow (cfs)
1
Runoff Depth=0.48"
Flow Length=806'
Tc=28.2 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 799 of 1493
Page 800
23-4121 storm calcs - Existing Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment 2S: Existing - South
Runoff = 1.04 cfs @ 12.15 hrs, Volume= 3,797 cf, Depth= 0.48"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
93,939 80 Pasture/grassland/range, Good, HSG D
93,939 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
17.5 150 0.0370 0.14 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
2.6 212 0.0370 1.35 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
20.1 362 Total
Subcatchment 2S: Existing - South
Hydrograph
Runoff
1.04 cfs
1 Type II 24-hr
1-Year Rainfall=1.87"
Runoff Area=93,939 sf
Runoff Volume=3,797 cf
Flow (cfs)
Runoff Depth=0.48"
Flow Length=362'
Slope=0.0370 '/'
Tc=20.1 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 800 of 1493
Page 801
23-4121 storm calcs - Existing Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 9
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing - North Runoff Area=181,234 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=806' Tc=28.2 min CN=80 Runoff=4.98 cfs 20,479 cf
Subcatchment 2S: Existing - South Runoff Area=93,939 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=362' Slope=0.0370 '/' Tc=20.1 min CN=80 Runoff=3.19 cfs 10,615 cf
Total Runoff Area = 275,173 sf Runoff Volume = 31,093 cf Average Runoff Depth = 1.36"
100.00% Pervious = 275,173 sf 0.00% Impervious = 0 sf
Page 801 of 1493
Page 802
23-4121 storm calcs - Existing Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment 1S: Existing - North
Runoff = 4.98 cfs @ 12.23 hrs, Volume= 20,479 cf, Depth= 1.36"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
131,812 80 Pasture/grassland/range, Good, HSG D
49,422 79 Woods/grass comb., Good, HSG D
181,234 80 Weighted Average
181,234 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
16.9 150 0.0400 0.15 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
5.2 287 0.0170 0.91 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
4.0 284 0.0280 1.17 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
2.1 85 0.0180 0.67 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
28.2 806 Total
Subcatchment 1S: Existing - North
Hydrograph
Runoff
4.98 cfs
5
Type II 24-hr
10-Year Rainfall=3.14"
4 Runoff Area=181,234 sf
Runoff Volume=20,479 cf
Flow (cfs)
3 Runoff Depth=1.36"
Flow Length=806'
2
Tc=28.2 min
CN=80
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 802 of 1493
Page 803
23-4121 storm calcs - Existing Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment 2S: Existing - South
Runoff = 3.19 cfs @ 12.13 hrs, Volume= 10,615 cf, Depth= 1.36"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
93,939 80 Pasture/grassland/range, Good, HSG D
93,939 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
17.5 150 0.0370 0.14 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
2.6 212 0.0370 1.35 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
20.1 362 Total
Subcatchment 2S: Existing - South
Hydrograph
Runoff
3.19 cfs
3
Type II 24-hr
10-Year Rainfall=3.14"
Runoff Area=93,939 sf
Runoff Volume=10,615 cf
Flow (cfs)
2
Runoff Depth=1.36"
Flow Length=362'
Slope=0.0370 '/'
1 Tc=20.1 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 803 of 1493
Page 804
23-4121 storm calcs - Existing Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 12
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing - North Runoff Area=181,234 sf 0.00% Impervious Runoff Depth=1.91"
Flow Length=806' Tc=28.2 min CN=80 Runoff=7.12 cfs 28,850 cf
Subcatchment 2S: Existing - South Runoff Area=93,939 sf 0.00% Impervious Runoff Depth=1.91"
Flow Length=362' Slope=0.0370 '/' Tc=20.1 min CN=80 Runoff=4.54 cfs 14,954 cf
Total Runoff Area = 275,173 sf Runoff Volume = 43,803 cf Average Runoff Depth = 1.91"
100.00% Pervious = 275,173 sf 0.00% Impervious = 0 sf
Page 804 of 1493
Page 805
23-4121 storm calcs - Existing Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 13
Summary for Subcatchment 1S: Existing - North
Runoff = 7.12 cfs @ 12.23 hrs, Volume= 28,850 cf, Depth= 1.91"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
131,812 80 Pasture/grassland/range, Good, HSG D
49,422 79 Woods/grass comb., Good, HSG D
181,234 80 Weighted Average
181,234 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
16.9 150 0.0400 0.15 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
5.2 287 0.0170 0.91 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
4.0 284 0.0280 1.17 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
2.1 85 0.0180 0.67 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
28.2 806 Total
Subcatchment 1S: Existing - North
Hydrograph
Runoff
7.12 cfs
7 Type II 24-hr
25-Year Rainfall=3.84"
6
Runoff Area=181,234 sf
5 Runoff Volume=28,850 cf
Flow (cfs)
Runoff Depth=1.91"
4
Flow Length=806'
3 Tc=28.2 min
CN=80
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 805 of 1493
Page 806
23-4121 storm calcs - Existing Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 14
Summary for Subcatchment 2S: Existing - South
Runoff = 4.54 cfs @ 12.13 hrs, Volume= 14,954 cf, Depth= 1.91"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
93,939 80 Pasture/grassland/range, Good, HSG D
93,939 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
17.5 150 0.0370 0.14 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
2.6 212 0.0370 1.35 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
20.1 362 Total
Subcatchment 2S: Existing - South
Hydrograph
5 Runoff
4.54 cfs
Type II 24-hr
4 25-Year Rainfall=3.84"
Runoff Area=93,939 sf
Runoff Volume=14,954 cf
3
Flow (cfs)
Runoff Depth=1.91"
Flow Length=362'
2
Slope=0.0370 '/'
Tc=20.1 min
1 CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 806 of 1493
Page 807
23-4121 storm calcs - Existing Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 15
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing - North Runoff Area=181,234 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=806' Tc=28.2 min CN=80 Runoff=11.60 cfs 46,735 cf
Subcatchment 2S: Existing - South Runoff Area=93,939 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=362' Slope=0.0370 '/' Tc=20.1 min CN=80 Runoff=7.37 cfs 24,224 cf
Total Runoff Area = 275,173 sf Runoff Volume = 70,959 cf Average Runoff Depth = 3.09"
100.00% Pervious = 275,173 sf 0.00% Impervious = 0 sf
Page 807 of 1493
Page 808
23-4121 storm calcs - Existing Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 16
Summary for Subcatchment 1S: Existing - North
Runoff = 11.60 cfs @ 12.22 hrs, Volume= 46,735 cf, Depth= 3.09"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
131,812 80 Pasture/grassland/range, Good, HSG D
49,422 79 Woods/grass comb., Good, HSG D
181,234 80 Weighted Average
181,234 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
16.9 150 0.0400 0.15 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
5.2 287 0.0170 0.91 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
4.0 284 0.0280 1.17 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
2.1 85 0.0180 0.67 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
28.2 806 Total
Subcatchment 1S: Existing - North
Hydrograph
Runoff
11.60 cfs
12
11
Type II 24-hr
10
100-Year Rainfall=5.23"
9 Runoff Area=181,234 sf
8 Runoff Volume=46,735 cf
Flow (cfs)
7 Runoff Depth=3.09"
6 Flow Length=806'
5 Tc=28.2 min
4 CN=80
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 808 of 1493
Page 809
23-4121 storm calcs - Existing Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 17
Summary for Subcatchment 2S: Existing - South
Runoff = 7.37 cfs @ 12.13 hrs, Volume= 24,224 cf, Depth= 3.09"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
93,939 80 Pasture/grassland/range, Good, HSG D
93,939 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
17.5 150 0.0370 0.14 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
2.6 212 0.0370 1.35 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
20.1 362 Total
Subcatchment 2S: Existing - South
Hydrograph
8 Runoff
7.37 cfs
7
Type II 24-hr
100-Year Rainfall=5.23"
6
Runoff Area=93,939 sf
5
Runoff Volume=24,224 cf
Flow (cfs)
Runoff Depth=3.09"
4
Flow Length=362'
3 Slope=0.0370 '/'
Tc=20.1 min
2
CN=80
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 809 of 1493
Page 810
1S
Proposed - North
1P 3S
2S Detention Pond Direct
Proposed - South
Subcat Reach Pond Link Routing Diagram for 23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design, Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC
Page 810 of 1493
Page 811
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-Year Type II 24-hr Default 24.00 1 1.87 2
2 10-Year Type II 24-hr Default 24.00 1 3.14 2
3 25-Year Type II 24-hr Default 24.00 1 3.84 2
4 100-Year Type II 24-hr Default 24.00 1 5.23 2
Page 811 of 1493
Page 812
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (all nodes)
Area CN Description
(sq-ft) (subcatchment-numbers)
146,543 80 >75% Grass cover, Good, HSG D (1S, 2S, 3S)
1,626 98 Concrete, HSG D (2S)
67,908 98 Paved parking, HSG D (1S, 2S)
55,578 98 Roofs, HSG D (1S, 2S)
3,518 98 Sidewalk, HSG D (1S)
275,173 88 TOTAL AREA
Page 812 of 1493
Page 813
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (all nodes)
Area Soil Subcatchment
(sq-ft) Group Numbers
0 HSG A
0 HSG B
0 HSG C
275,173 HSG D 1S, 2S, 3S
0 Other
275,173 TOTAL AREA
Page 813 of 1493
Page 814
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 5
Ground Covers (all nodes)
HSG-A HSG-B HSG-C HSG-D Other Total Ground Su
(sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) Cover Nu
0 0 0 146,543 0 146,543 >75% Grass
cover, Good
0 0 0 1,626 0 1,626 Concrete
0 0 0 67,908 0 67,908 Paved parking
0 0 0 55,578 0 55,578 Roofs
0 0 0 3,518 0 3,518 Sidewalk
0 0 0 275,173 0 275,173 TOTAL AREA
Page 814 of 1493
Page 815
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 6
Pipe Listing (all nodes)
Line# Node In-Invert Out-Invert Length Slope n Width Diam/Height Inside-Fill Node
Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) Name
1 1S 0.00 0.00 182.0 0.0050 0.013 0.0 6.0 0.0
2 1S 0.00 0.00 70.0 0.0070 0.013 0.0 12.0 0.0
3 1S 0.00 0.00 400.0 0.0100 0.013 0.0 12.0 0.0
4 2S 0.00 0.00 194.0 0.0050 0.013 0.0 8.0 0.0
5 2S 0.00 0.00 209.0 0.0080 0.013 0.0 12.0 0.0
6 2S 0.00 0.00 171.0 0.0110 0.013 0.0 12.0 0.0
7 1P 669.00 668.92 17.0 0.0047 0.013 0.0 8.0 0.0
8 1P 668.92 668.80 25.0 0.0048 0.013 0.0 8.0 0.0
Page 815 of 1493
Page 816
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 7
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=0.92"
Flow Length=738' Tc=24.8 min CN=89 Runoff=3.28 cfs 12,245 cf
Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=0.92"
Flow Length=627' Tc=19.8 min CN=89 Runoff=2.21 cfs 7,211 cf
Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=0.48"
Flow Length=58' Tc=7.8 min CN=80 Runoff=0.38 cfs 878 cf
Pond 1P: Detention Pond Peak Elev=671.04' Storage=5,335 cf Inflow=5.40 cfs 19,456 cf
Outflow=1.94 cfs 19,456 cf
Total Runoff Area = 275,173 sf Runoff Volume = 20,334 cf Average Runoff Depth = 0.89"
53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf
Page 816 of 1493
Page 817
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment 1S: Proposed - North
[47] Hint: Peak is 826% of capacity of segment #3
[47] Hint: Peak is 110% of capacity of segment #4
Runoff = 3.28 cfs @ 12.19 hrs, Volume= 12,245 cf, Depth= 0.92"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
32,787 98 Roofs, HSG D
45,906 98 Paved parking, HSG D
* 3,518 98 Sidewalk, HSG D
77,291 80 >75% Grass cover, Good, HSG D
159,502 89 Weighted Average
77,291 48.46% Pervious Area
82,211 51.54% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.4 21 0.0090 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.1 65 0.0100 0.07 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.5 182 0.0050 2.02 0.40 Pipe Channel, 6" @ 0.5%
6.0" Round Area= 0.2 sf Perim= 1.6' r= 0.13'
n= 0.013 Corrugated PE, smooth interior
0.3 70 0.0070 3.80 2.98 Pipe Channel, 12" @ 0.7%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
1.5 400 0.0100 4.54 3.56 Pipe Channel, 12" @ 1.0%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
24.8 738 Total
Page 817 of 1493
Page 818
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 9
Subcatchment 1S: Proposed - North
Hydrograph
Runoff
3.28 cfs
Type II 24-hr
3
1-Year Rainfall=1.87"
Runoff Area=159,502 sf
Runoff Volume=12,245 cf
Flow (cfs)
2 Runoff Depth=0.92"
Flow Length=738'
Tc=24.8 min
1
CN=89
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 818 of 1493
Page 819
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment 2S: Proposed - South
[47] Hint: Peak is 258% of capacity of segment #3
Runoff = 2.21 cfs @ 12.13 hrs, Volume= 7,211 cf, Depth= 0.92"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
22,791 98 Roofs, HSG D
22,002 98 Paved parking, HSG D
* 1,626 98 Concrete, HSG D
47,520 80 >75% Grass cover, Good, HSG D
93,939 89 Weighted Average
47,520 50.59% Pervious Area
46,419 49.41% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.4 10 0.0900 0.12 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.6 43 0.0040 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.3 194 0.0050 2.45 0.85 Pipe Channel, 8" @ 0.5%
8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'
n= 0.013 Corrugated PE, smooth interior
0.9 209 0.0080 4.06 3.19 Pipe Channel, 12" @ 0.8%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.6 171 0.0110 4.76 3.74 Pipe Channel, 12" @ 1.1%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
19.8 627 Total
Page 819 of 1493
Page 820
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 11
Subcatchment 2S: Proposed - South
Hydrograph
Runoff
2.21 cfs
Type II 24-hr
2
1-Year Rainfall=1.87"
Runoff Area=93,939 sf
Runoff Volume=7,211 cf
Flow (cfs)
Runoff Depth=0.92"
Flow Length=627'
1
Tc=19.8 min
CN=89
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 820 of 1493
Page 821
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 12
Summary for Subcatchment 3S: Direct
Runoff = 0.38 cfs @ 12.00 hrs, Volume= 878 cf, Depth= 0.48"
Routed to nonexistent node 2P
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
21,732 80 >75% Grass cover, Good, HSG D
21,732 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.4 10 0.0100 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
4.4 48 0.1200 0.18 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
7.8 58 Total
Subcatchment 3S: Direct
Hydrograph
0.42 Runoff
0.4
0.38 cfs
0.38
0.36
Type II 24-hr
0.34
0.32
1-Year Rainfall=1.87"
0.3
0.28
Runoff Area=21,732 sf
0.26
Runoff Volume=878 cf
Flow (cfs)
0.24
0.22
0.2
Runoff Depth=0.48"
0.18
0.16
Flow Length=58'
0.14
0.12
Tc=7.8 min
0.1
0.08
CN=80
0.06
0.04
0.02
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 821 of 1493
Page 822
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 13
Summary for Pond 1P: Detention Pond
Inflow Area = 253,441 sf, 50.75% Impervious, Inflow Depth = 0.92" for 1-Year event
Inflow = 5.40 cfs @ 12.16 hrs, Volume= 19,456 cf
Outflow = 1.94 cfs @ 12.51 hrs, Volume= 19,456 cf, Atten= 64%, Lag= 21.3 min
Primary = 1.94 cfs @ 12.51 hrs, Volume= 19,456 cf
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 671.04' @ 12.51 hrs Surf.Area= 4,107 sf Storage= 5,335 cf
Plug-Flow detention time= 26.2 min calculated for 19,456 cf (100% of inflow)
Center-of-Mass det. time= 26.2 min ( 873.2 - 847.0 )
Volume Invert Avail.Storage Storage Description
#1 669.00' 38,878 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
669.00 0 0 0
670.00 3,130 1,565 1,565
671.00 4,065 3,598 5,163
672.00 5,060 4,563 9,725
673.00 6,110 5,585 15,310
674.00 13,125 9,618 24,928
675.00 14,775 13,950 38,878
Device Routing Invert Outlet Devices
#1 Device 3 669.00' 8.0" Round Culvert
L= 17.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 669.00' / 668.92' S= 0.0047 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 3 674.80' 24.0" x 24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Primary 668.92' 8.0" Round Culvert
L= 25.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 668.92' / 668.80' S= 0.0048 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=1.94 cfs @ 12.51 hrs HW=671.04' (Free Discharge)
3=Culvert (Passes 1.94 cfs of 1.98 cfs potential flow)
1=Culvert (Inlet Controls 1.94 cfs @ 5.55 fps)
2=Orifice/Grate ( Controls 0.00 cfs)
Page 822 of 1493
Page 823
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 14
Pond 1P: Detention Pond
Hydrograph
Inflow
6 5.40 cfs Primary
Inflow Area=253,441 sf
5 Peak Elev=671.04'
Storage=5,335 cf
4
Flow (cfs)
3
1.94 cfs
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 823 of 1493
Page 824
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 15
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=2.03"
Flow Length=738' Tc=24.8 min CN=89 Runoff=7.22 cfs 26,940 cf
Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=2.03"
Flow Length=627' Tc=19.8 min CN=89 Runoff=4.85 cfs 15,867 cf
Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=58' Tc=7.8 min CN=80 Runoff=1.12 cfs 2,456 cf
Pond 1P: Detention Pond Peak Elev=672.95' Storage=15,013 cf Inflow=11.90 cfs 42,807 cf
Outflow=2.82 cfs 42,807 cf
Total Runoff Area = 275,173 sf Runoff Volume = 45,263 cf Average Runoff Depth = 1.97"
53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf
Page 824 of 1493
Page 825
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 16
Summary for Subcatchment 1S: Proposed - North
[47] Hint: Peak is 1821% of capacity of segment #3
[47] Hint: Peak is 242% of capacity of segment #4
[47] Hint: Peak is 203% of capacity of segment #5
Runoff = 7.22 cfs @ 12.18 hrs, Volume= 26,940 cf, Depth= 2.03"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
32,787 98 Roofs, HSG D
45,906 98 Paved parking, HSG D
* 3,518 98 Sidewalk, HSG D
77,291 80 >75% Grass cover, Good, HSG D
159,502 89 Weighted Average
77,291 48.46% Pervious Area
82,211 51.54% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.4 21 0.0090 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.1 65 0.0100 0.07 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.5 182 0.0050 2.02 0.40 Pipe Channel, 6" @ 0.5%
6.0" Round Area= 0.2 sf Perim= 1.6' r= 0.13'
n= 0.013 Corrugated PE, smooth interior
0.3 70 0.0070 3.80 2.98 Pipe Channel, 12" @ 0.7%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
1.5 400 0.0100 4.54 3.56 Pipe Channel, 12" @ 1.0%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
24.8 738 Total
Page 825 of 1493
Page 826
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 17
Subcatchment 1S: Proposed - North
Hydrograph
8 Runoff
7.22 cfs
7 Type II 24-hr
10-Year Rainfall=3.14"
6
Runoff Area=159,502 sf
5 Runoff Volume=26,940 cf
Flow (cfs)
Runoff Depth=2.03"
4
Flow Length=738'
3 Tc=24.8 min
CN=89
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 826 of 1493
Page 827
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 18
Summary for Subcatchment 2S: Proposed - South
[47] Hint: Peak is 567% of capacity of segment #3
[47] Hint: Peak is 152% of capacity of segment #4
[47] Hint: Peak is 130% of capacity of segment #5
Runoff = 4.85 cfs @ 12.12 hrs, Volume= 15,867 cf, Depth= 2.03"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
22,791 98 Roofs, HSG D
22,002 98 Paved parking, HSG D
* 1,626 98 Concrete, HSG D
47,520 80 >75% Grass cover, Good, HSG D
93,939 89 Weighted Average
47,520 50.59% Pervious Area
46,419 49.41% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.4 10 0.0900 0.12 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.6 43 0.0040 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.3 194 0.0050 2.45 0.85 Pipe Channel, 8" @ 0.5%
8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'
n= 0.013 Corrugated PE, smooth interior
0.9 209 0.0080 4.06 3.19 Pipe Channel, 12" @ 0.8%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.6 171 0.0110 4.76 3.74 Pipe Channel, 12" @ 1.1%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
19.8 627 Total
Page 827 of 1493
Page 828
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 19
Subcatchment 2S: Proposed - South
Hydrograph
Runoff
4.85 cfs
5
Type II 24-hr
10-Year Rainfall=3.14"
4
Runoff Area=93,939 sf
Runoff Volume=15,867 cf
Flow (cfs)
3 Runoff Depth=2.03"
Flow Length=627'
2 Tc=19.8 min
CN=89
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 828 of 1493
Page 829
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 20
Summary for Subcatchment 3S: Direct
Runoff = 1.12 cfs @ 12.00 hrs, Volume= 2,456 cf, Depth= 1.36"
Routed to nonexistent node 2P
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
21,732 80 >75% Grass cover, Good, HSG D
21,732 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.4 10 0.0100 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
4.4 48 0.1200 0.18 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
7.8 58 Total
Subcatchment 3S: Direct
Hydrograph
Runoff
1.12 cfs
Type II 24-hr
1
10-Year Rainfall=3.14"
Runoff Area=21,732 sf
Runoff Volume=2,456 cf
Flow (cfs)
Runoff Depth=1.36"
Flow Length=58'
Tc=7.8 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 829 of 1493
Page 830
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 21
Summary for Pond 1P: Detention Pond
Inflow Area = 253,441 sf, 50.75% Impervious, Inflow Depth = 2.03" for 10-Year event
Inflow = 11.90 cfs @ 12.15 hrs, Volume= 42,807 cf
Outflow = 2.82 cfs @ 12.64 hrs, Volume= 42,807 cf, Atten= 76%, Lag= 29.2 min
Primary = 2.82 cfs @ 12.64 hrs, Volume= 42,807 cf
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 672.95' @ 12.64 hrs Surf.Area= 6,059 sf Storage= 15,013 cf
Plug-Flow detention time= 47.9 min calculated for 42,782 cf (100% of inflow)
Center-of-Mass det. time= 47.9 min ( 872.3 - 824.5 )
Volume Invert Avail.Storage Storage Description
#1 669.00' 38,878 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
669.00 0 0 0
670.00 3,130 1,565 1,565
671.00 4,065 3,598 5,163
672.00 5,060 4,563 9,725
673.00 6,110 5,585 15,310
674.00 13,125 9,618 24,928
675.00 14,775 13,950 38,878
Device Routing Invert Outlet Devices
#1 Device 3 669.00' 8.0" Round Culvert
L= 17.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 669.00' / 668.92' S= 0.0047 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 3 674.80' 24.0" x 24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Primary 668.92' 8.0" Round Culvert
L= 25.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 668.92' / 668.80' S= 0.0048 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=2.82 cfs @ 12.64 hrs HW=672.95' (Free Discharge)
3=Culvert (Passes 2.82 cfs of 2.85 cfs potential flow)
1=Culvert (Inlet Controls 2.82 cfs @ 8.08 fps)
2=Orifice/Grate ( Controls 0.00 cfs)
Page 830 of 1493
Page 831
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 22
Pond 1P: Detention Pond
Hydrograph
Inflow
11.90 cfs Primary
13
12 Inflow Area=253,441 sf
11 Peak Elev=672.95'
10
Storage=15,013 cf
9
8
Flow (cfs)
7
6
5
4
2.82 cfs
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 831 of 1493
Page 832
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 23
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=2.67"
Flow Length=738' Tc=24.8 min CN=89 Runoff=9.47 cfs 35,532 cf
Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=2.67"
Flow Length=627' Tc=19.8 min CN=89 Runoff=6.35 cfs 20,927 cf
Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=1.91"
Flow Length=58' Tc=7.8 min CN=80 Runoff=1.57 cfs 3,459 cf
Pond 1P: Detention Pond Peak Elev=673.70' Storage=21,268 cf Inflow=15.59 cfs 56,458 cf
Outflow=3.10 cfs 56,458 cf
Total Runoff Area = 275,173 sf Runoff Volume = 59,918 cf Average Runoff Depth = 2.61"
53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf
Page 832 of 1493
Page 833
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 24
Summary for Subcatchment 1S: Proposed - North
[47] Hint: Peak is 2386% of capacity of segment #3
[47] Hint: Peak is 318% of capacity of segment #4
[47] Hint: Peak is 266% of capacity of segment #5
Runoff = 9.47 cfs @ 12.18 hrs, Volume= 35,532 cf, Depth= 2.67"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
32,787 98 Roofs, HSG D
45,906 98 Paved parking, HSG D
* 3,518 98 Sidewalk, HSG D
77,291 80 >75% Grass cover, Good, HSG D
159,502 89 Weighted Average
77,291 48.46% Pervious Area
82,211 51.54% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.4 21 0.0090 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.1 65 0.0100 0.07 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.5 182 0.0050 2.02 0.40 Pipe Channel, 6" @ 0.5%
6.0" Round Area= 0.2 sf Perim= 1.6' r= 0.13'
n= 0.013 Corrugated PE, smooth interior
0.3 70 0.0070 3.80 2.98 Pipe Channel, 12" @ 0.7%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
1.5 400 0.0100 4.54 3.56 Pipe Channel, 12" @ 1.0%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
24.8 738 Total
Page 833 of 1493
Page 834
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 25
Subcatchment 1S: Proposed - North
Hydrograph
Runoff
10 9.47 cfs
9
Type II 24-hr
25-Year Rainfall=3.84"
8
Runoff Area=159,502 sf
7
Runoff Volume=35,532 cf
Flow (cfs)
6
Runoff Depth=2.67"
5 Flow Length=738'
4 Tc=24.8 min
3 CN=89
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 834 of 1493
Page 835
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 26
Summary for Subcatchment 2S: Proposed - South
[47] Hint: Peak is 743% of capacity of segment #3
[47] Hint: Peak is 199% of capacity of segment #4
[47] Hint: Peak is 170% of capacity of segment #5
Runoff = 6.35 cfs @ 12.12 hrs, Volume= 20,927 cf, Depth= 2.67"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
22,791 98 Roofs, HSG D
22,002 98 Paved parking, HSG D
* 1,626 98 Concrete, HSG D
47,520 80 >75% Grass cover, Good, HSG D
93,939 89 Weighted Average
47,520 50.59% Pervious Area
46,419 49.41% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.4 10 0.0900 0.12 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.6 43 0.0040 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.3 194 0.0050 2.45 0.85 Pipe Channel, 8" @ 0.5%
8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'
n= 0.013 Corrugated PE, smooth interior
0.9 209 0.0080 4.06 3.19 Pipe Channel, 12" @ 0.8%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.6 171 0.0110 4.76 3.74 Pipe Channel, 12" @ 1.1%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
19.8 627 Total
Page 835 of 1493
Page 836
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 27
Subcatchment 2S: Proposed - South
Hydrograph
7 Runoff
6.35 cfs
6
Type II 24-hr
25-Year Rainfall=3.84"
5 Runoff Area=93,939 sf
Runoff Volume=20,927 cf
Flow (cfs)
4
Runoff Depth=2.67"
Flow Length=627'
3
Tc=19.8 min
2 CN=89
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 836 of 1493
Page 837
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 28
Summary for Subcatchment 3S: Direct
Runoff = 1.57 cfs @ 11.99 hrs, Volume= 3,459 cf, Depth= 1.91"
Routed to nonexistent node 2P
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
21,732 80 >75% Grass cover, Good, HSG D
21,732 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.4 10 0.0100 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
4.4 48 0.1200 0.18 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
7.8 58 Total
Subcatchment 3S: Direct
Hydrograph
Runoff
1.57 cfs
Type II 24-hr
25-Year Rainfall=3.84"
Runoff Area=21,732 sf
Runoff Volume=3,459 cf
Flow (cfs)
1
Runoff Depth=1.91"
Flow Length=58'
Tc=7.8 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 837 of 1493
Page 838
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 29
Summary for Pond 1P: Detention Pond
Inflow Area = 253,441 sf, 50.75% Impervious, Inflow Depth = 2.67" for 25-Year event
Inflow = 15.59 cfs @ 12.15 hrs, Volume= 56,458 cf
Outflow = 3.10 cfs @ 12.70 hrs, Volume= 56,458 cf, Atten= 80%, Lag= 33.0 min
Primary = 3.10 cfs @ 12.70 hrs, Volume= 56,458 cf
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 673.70' @ 12.70 hrs Surf.Area= 10,997 sf Storage= 21,268 cf
Plug-Flow detention time= 60.6 min calculated for 56,426 cf (100% of inflow)
Center-of-Mass det. time= 60.6 min ( 877.2 - 816.6 )
Volume Invert Avail.Storage Storage Description
#1 669.00' 38,878 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
669.00 0 0 0
670.00 3,130 1,565 1,565
671.00 4,065 3,598 5,163
672.00 5,060 4,563 9,725
673.00 6,110 5,585 15,310
674.00 13,125 9,618 24,928
675.00 14,775 13,950 38,878
Device Routing Invert Outlet Devices
#1 Device 3 669.00' 8.0" Round Culvert
L= 17.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 669.00' / 668.92' S= 0.0047 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 3 674.80' 24.0" x 24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Primary 668.92' 8.0" Round Culvert
L= 25.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 668.92' / 668.80' S= 0.0048 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=3.10 cfs @ 12.70 hrs HW=673.70' (Free Discharge)
3=Culvert (Passes 3.10 cfs of 3.13 cfs potential flow)
1=Culvert (Inlet Controls 3.10 cfs @ 8.87 fps)
2=Orifice/Grate ( Controls 0.00 cfs)
Page 838 of 1493
Page 839
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 30
Pond 1P: Detention Pond
Hydrograph
Inflow
15.59 cfs Primary
17
16 Inflow Area=253,441 sf
15
14 Peak Elev=673.70'
13
12
Storage=21,268 cf
11
Flow (cfs)
10
9
8
7
6
5
4 3.10 cfs
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 839 of 1493
Page 840
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 31
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=3.99"
Flow Length=738' Tc=24.8 min CN=89 Runoff=13.94 cfs 53,068 cf
Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=3.99"
Flow Length=627' Tc=19.8 min CN=89 Runoff=9.33 cfs 31,254 cf
Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=58' Tc=7.8 min CN=80 Runoff=2.52 cfs 5,604 cf
Pond 1P: Detention Pond Peak Elev=674.73' Storage=34,966 cf Inflow=22.95 cfs 84,322 cf
Outflow=3.45 cfs 84,322 cf
Total Runoff Area = 275,173 sf Runoff Volume = 89,926 cf Average Runoff Depth = 3.92"
53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf
Page 840 of 1493
Page 841
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 32
Summary for Subcatchment 1S: Proposed - North
[47] Hint: Peak is 3513% of capacity of segment #3
[47] Hint: Peak is 468% of capacity of segment #4
[47] Hint: Peak is 391% of capacity of segment #5
Runoff = 13.94 cfs @ 12.17 hrs, Volume= 53,068 cf, Depth= 3.99"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
32,787 98 Roofs, HSG D
45,906 98 Paved parking, HSG D
* 3,518 98 Sidewalk, HSG D
77,291 80 >75% Grass cover, Good, HSG D
159,502 89 Weighted Average
77,291 48.46% Pervious Area
82,211 51.54% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.4 21 0.0090 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.1 65 0.0100 0.07 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.5 182 0.0050 2.02 0.40 Pipe Channel, 6" @ 0.5%
6.0" Round Area= 0.2 sf Perim= 1.6' r= 0.13'
n= 0.013 Corrugated PE, smooth interior
0.3 70 0.0070 3.80 2.98 Pipe Channel, 12" @ 0.7%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
1.5 400 0.0100 4.54 3.56 Pipe Channel, 12" @ 1.0%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
24.8 738 Total
Page 841 of 1493
Page 842
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 33
Subcatchment 1S: Proposed - North
Hydrograph
Runoff
15 13.94 cfs
14
Type II 24-hr
13
12
100-Year Rainfall=5.23"
11 Runoff Area=159,502 sf
10
Runoff Volume=53,068 cf
9
Flow (cfs)
8
Runoff Depth=3.99"
7 Flow Length=738'
6 Tc=24.8 min
5
CN=89
4
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 842 of 1493
Page 843
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 34
Summary for Subcatchment 2S: Proposed - South
[47] Hint: Peak is 1092% of capacity of segment #3
[47] Hint: Peak is 293% of capacity of segment #4
[47] Hint: Peak is 250% of capacity of segment #5
Runoff = 9.33 cfs @ 12.12 hrs, Volume= 31,254 cf, Depth= 3.99"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
22,791 98 Roofs, HSG D
22,002 98 Paved parking, HSG D
* 1,626 98 Concrete, HSG D
47,520 80 >75% Grass cover, Good, HSG D
93,939 89 Weighted Average
47,520 50.59% Pervious Area
46,419 49.41% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.4 10 0.0900 0.12 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.6 43 0.0040 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.3 194 0.0050 2.45 0.85 Pipe Channel, 8" @ 0.5%
8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'
n= 0.013 Corrugated PE, smooth interior
0.9 209 0.0080 4.06 3.19 Pipe Channel, 12" @ 0.8%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.6 171 0.0110 4.76 3.74 Pipe Channel, 12" @ 1.1%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
19.8 627 Total
Page 843 of 1493
Page 844
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 35
Subcatchment 2S: Proposed - South
Hydrograph
Runoff
10 9.33 cfs
9 Type II 24-hr
8
100-Year Rainfall=5.23"
Runoff Area=93,939 sf
7
Runoff Volume=31,254 cf
6
Flow (cfs)
Runoff Depth=3.99"
5
Flow Length=627'
4 Tc=19.8 min
3 CN=89
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 844 of 1493
Page 845
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 36
Summary for Subcatchment 3S: Direct
Runoff = 2.52 cfs @ 11.99 hrs, Volume= 5,604 cf, Depth= 3.09"
Routed to nonexistent node 2P
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
21,732 80 >75% Grass cover, Good, HSG D
21,732 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.4 10 0.0100 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
4.4 48 0.1200 0.18 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
7.8 58 Total
Subcatchment 3S: Direct
Hydrograph
Runoff
2.52 cfs
Type II 24-hr
100-Year Rainfall=5.23"
2 Runoff Area=21,732 sf
Runoff Volume=5,604 cf
Flow (cfs)
Runoff Depth=3.09"
Flow Length=58'
1 Tc=7.8 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 845 of 1493
Page 846
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 37
Summary for Pond 1P: Detention Pond
Inflow Area = 253,441 sf, 50.75% Impervious, Inflow Depth = 3.99" for 100-Year event
Inflow = 22.95 cfs @ 12.15 hrs, Volume= 84,322 cf
Outflow = 3.45 cfs @ 12.81 hrs, Volume= 84,322 cf, Atten= 85%, Lag= 39.9 min
Primary = 3.45 cfs @ 12.81 hrs, Volume= 84,322 cf
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 674.73' @ 12.81 hrs Surf.Area= 14,332 sf Storage= 34,966 cf
Plug-Flow detention time= 89.0 min calculated for 84,273 cf (100% of inflow)
Center-of-Mass det. time= 89.0 min ( 894.3 - 805.3 )
Volume Invert Avail.Storage Storage Description
#1 669.00' 38,878 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
669.00 0 0 0
670.00 3,130 1,565 1,565
671.00 4,065 3,598 5,163
672.00 5,060 4,563 9,725
673.00 6,110 5,585 15,310
674.00 13,125 9,618 24,928
675.00 14,775 13,950 38,878
Device Routing Invert Outlet Devices
#1 Device 3 669.00' 8.0" Round Culvert
L= 17.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 669.00' / 668.92' S= 0.0047 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 3 674.80' 24.0" x 24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Primary 668.92' 8.0" Round Culvert
L= 25.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 668.92' / 668.80' S= 0.0048 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=3.45 cfs @ 12.81 hrs HW=674.73' (Free Discharge)
3=Culvert (Passes 3.45 cfs of 3.47 cfs potential flow)
1=Culvert (Inlet Controls 3.45 cfs @ 9.87 fps)
2=Orifice/Grate ( Controls 0.00 cfs)
Page 846 of 1493
Page 847
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 38
Pond 1P: Detention Pond
Hydrograph
Inflow
22.95 cfs Primary
24
Inflow Area=253,441 sf
22
20
Peak Elev=674.73'
18
Storage=34,966 cf
16
Flow (cfs)
14
12
10
8
6
3.45 cfs
4
2
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 847 of 1493
Page 848
Appendix E
Soil Information
Page 848 of 1493
Page 849
Hydrologic Soil Group—Erie County, New York
78° 46' 6'' W
78° 45' 44'' W
682440 682490 682540 682590 682640 682690 682740 682790 682840 682890 682940
42° 48' 45'' N 42° 48' 45'' N
4742410
4742410
4742360
4742360
4742310
4742310
4742260
4742260
4742210
4742210
4742160
4742160
4742110
Soil Map may not be valid at this scale.
4742110
42° 48' 34'' N 42° 48' 34'' N
682490 682540 682590 682640 682690 682740 682790 682840 682890 682940
Map Scale: 1:2,300 if printed on A landscape (11" x 8.5") sheet.
Meters
78° 46' 6'' W
78° 45' 44'' W
N 0 30 60 120 180
Feet
0 100 200 400 600
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84
Natural Resources Web Soil Survey 5/14/2026
Page 849 of 1493
Conservation Service National Cooperative Soil Survey Page 1 of 4
Page 850
Hydrologic Soil Group—Erie County, New York
MAP LEGEND MAP INFORMATION
Area of Interest (AOI) C The soil surveys that comprise your AOI were mapped at
Area of Interest (AOI) 1:15,800.
C/D
Soils Warning: Soil Map may not be valid at this scale.
D
Soil Rating Polygons
Not rated or not available Enlargement of maps beyond the scale of mapping can cause
A
misunderstanding of the detail of mapping and accuracy of soil
A/D Water Features line placement. The maps do not show the small areas of
Streams and Canals contrasting soils that could have been shown at a more detailed
B scale.
Transportation
B/D
Rails Please rely on the bar scale on each map sheet for map
C measurements.
Interstate Highways
C/D Source of Map: Natural Resources Conservation Service
US Routes
D
Web Soil Survey URL:
Major Roads Coordinate System: Web Mercator (EPSG:3857)
Not rated or not available
Local Roads Maps from the Web Soil Survey are based on the Web Mercator
Soil Rating Lines projection, which preserves direction and shape but distorts
Background
A distance and area. A projection that preserves area, such as the
Aerial Photography
Albers equal-area conic projection, should be used if more
A/D accurate calculations of distance or area are required.
B This product is generated from the USDA-NRCS certified data as
B/D
of the version date(s) listed below.
C Soil Survey Area: Erie County, New York
Survey Area Data: Version 25, Sep 4, 2025
C/D
Soil map units are labeled (as space allows) for map scales
D 1:50,000 or larger.
Not rated or not available Date(s) aerial images were photographed: May 13, 2023—May
27, 2023
Soil Rating Points
A The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
A/D imagery displayed on these maps. As a result, some minor
B shifting of map unit boundaries may be evident.
B/D
Natural Resources Web Soil Survey 5/14/2026
Page 850 of 1493
Conservation Service National Cooperative Soil Survey Page 2 of 4
Page 851
Hydrologic Soil Group—Erie County, New York
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
DbA Darien silt loam, 0 to 3 C/D 6.3 43.8%
percent slopes
Nh Niagara silt loam, till C/D 2.1 14.5%
substratum
RfB Remsen silty clay loam, D 6.0 41.7%
3 to 8 percent slopes
Totals for Area of Interest 14.5 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Natural Resources Web Soil Survey 5/14/2026
Conservation Service National Cooperative Soil Survey Page 3 of 4
Page 851 of 1493
Page 852
Hydrologic Soil Group—Erie County, New York
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Natural Resources Web Soil Survey 5/14/2026
Conservation Service National Cooperative Soil Survey Page 4 of 4
Page 852 of 1493
Page 853
STORMWATER POLLUTION
PREVENTION PLAN
for
CONSTRUCTION ACTIVITIES
At
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, Erie County, New York
Prepared for
Brian Hillery & William Sahlem
1 Woodthrush Trail
Orchard Park, NY 14127
Prepared by
Carmina Wood Design
80 Silo City Row, Suite 100
Buffalo, NY 14203
Telephone: (716) 842-3165
Fax: (716) 842-0263
May 2026
Page 853 of 1493
Page 854
Table of Contents
Section 101 - Scope
Section 102 - Project Name and Location
Section 103 - Operator’s Name and Address
Section 104 - Project Description
Section 105 - Runoff Coefficient, Soils and Rainfall Information
Section 106 - Name of Receiving Waters
Section 107 - Indian Country Lands
Section 108 - Endangered or Threatened Species
Section 109 - Critical Habitat
Section 110 - Historic Places
Section 111 - Wetlands and/or Other Surface Waters
Section 112 - Erosion and Sediment Controls
Section 112.1 - Stabilization Practices
Section 112.2 - Structural Practices
Section 112.3 - Sequence of Major Activities
Section 112.4 - Storm Water Management
Section 113 - Other Controls
Section 114 - Compliance with Federal, State and Local Regulations
Section 115 - Inspection and Maintenance Procedures
Section 116 - Inspection and Maintenance Report Forms
Section 117 - Other Record-Keeping Requirements
Section 118 - Spill Prevention Control and Countermeasures (SPCC) Plan
Section 118.1 - Materials Covered
Section 118.2 - Material Management Practices
Section 118.3 - Spill Prevention and Response Procedures
Section 119 - Control of Non-Storm Water Discharges
Section 120 – Storm Water Control Facility Maintenance
Multifamily Development
5/26/26
Page 1 of 23
Page 854 of 1493
Page 855
Table of Contents (con’t)
Appendix A Site Location Map
Appendix B NYSDEC Notice of Intent (NOI)
Appendix C MS4 SWPPP Acceptance Form
Appendix D Engineer’s Report
Appendix E NYSDEC SPDES General Permit for Stormwater Discharges from Construction Activity Permit No.
GP-0-25-001
Appendix F Forms
• Contractor’s Certification
• Owner/Operator Certification
• SWPPP Preparer Certification
• NYSDEC Letter of Acknowledgment
Appendix G NYSDEC Notice of Termination (NOT)
Appendix H Construction Documents
Appendix I Standard Erosion Control Details
Appendix J Wetland Delineation Figure: by LaBella
Appendix K OPRHP Clearance Letter
Appendix L NYSDEC Stormwater Management Inspection Lists
Multifamily Development
5/26/26
Page 2 of 23
Page 855 of 1493
Page 856
101 SCOPE
A. PURPOSE: Brian Hellery & William Sahlem have placed an emphasis on following the New York State
Department of Environmental Conservation (NYSDEC) SPDES General Permit for Stormwater Discharges
from Construction Activity governing storm water discharges during construction, and in accordance with
erosion control practices. The Contractor’s participation in this program is mandatory and its non-
compliance is subject to various remedies, including without limitation, monetary set-offs, withholding
payments; reimbursement for costs, expenses (including reasonable attorney’s fees), fines and civil
penalties incurred by the owner; and/or liquidated damages. This section provides a descriptive
explanation of the owner’s Storm Water Pollution Prevention Program and required Contractor
participation.
The Engineer of record for this project certifies that this SWPPP meets the requirements and is in
compliance with the New York State Stormwater Management Design Manual and latest NYSDEC Phase II
stormwater regulation requirements.
B. SPDES General Permit for Stormwater Discharges from Construction Activity: Regulations promulgated
by the NYSDEC to regulate the discharge of storm water from construction activities on sites where more
than one (1) acre of soil is disturbed. One of the ways to comply with these regulations for affected sites
is to request coverage under the General Permit for Construction Activities for New York State. In order
to use the General Permit, a Notice of Intent (NOI) form must be completed and electronically submitted
to the NYSDEC at least 5 business days prior to any earth-disturbing activities (this time frame may
increase to 60 business days if a full review of the SWPPP is determined necessary by the NYSDEC) and a
Storm Water Pollution Prevention Plan (SWPPP) for the site must be prepared and followed during the
construction activities. Once a copy of the SPDES permit is received from NYSDEC, a copy will be included
in Appendix F of this report.
Approval from a regulated, traditional land use control MS4:
1. An owner or operator of a construction activity that is not subject to the requirements of a
regulated, traditional land use control MS4 must first develop a SWPPP in accordance with all
applicable requirements of this permit and then submit a completed NOI form to the NYSDEC.
2. An owner or operator of a construction activity that is subject to the requirements of a
regulated, traditional land use control MS4 must first develop a SWPPP in accordance with all
applicable requirements of this permit and then have its SWPPP reviewed and accepted by the
MS4 prior to submitting the NOI to the NYSDEC. The owner or operator shall have the “MS4
SWPPP Acceptance” form signed by the principal executive officer or ranking elected official
from the regulated, traditional land use control MS4, or by a duly authorized representative of
that person, and then submit that form along with the NOI to the address referenced under
“Notice of Intent (NOI) Submittal”.
C. RESPONSIBILITIES OF THE CONTRACTOR: The Contractor shall manage the discharge of storm water from
the site in accordance with the NYSDEC General Permit for Construction Activities conditions and the
following provisions of this section. The Operator shall be responsible for conducting the storm water
management practices in accordance with the permit. The Contractor shall be responsible for providing
qualified inspectors to conduct the inspections required by the SWPPP. The Contractor shall be
responsible for any enforcement action taken or imposed by federal, state, or local agencies, including
the cost of fines, construction delays, and remedial actions resulting from the Contractor’s failure to
comply with the permit provisions. It shall be the responsibility of the Contractor to make any changes to
the SWPPP necessary when the Contractor or any of his subcontractors elects to use borrow or fill or
Multifamily Development
5/26/26
Page 3 of 23
Page 856 of 1493
Page 857
material storage sites, either contiguous to or remote from the construction site, when such sites are
used solely for this construction site. Such sites are considered to be part of the construction site
covered by the permit and this SWPPP. Off-site borrow, fill, or material storage sites which are used for
multiple construction projects are not subject to this requirement, unless specifically required by state or
local jurisdictional entity regulations. The Contractor should consider this requirement in negotiating with
earthwork subcontractors, since the choice of an off-site borrow, fill, or material storage site may impact
their duty to implement, make changes to, and perform inspections required by the SWPPP for the site.
D. NOTICE OF INTENT: The Operator has petitioned the NYSDEC for coverage under the storm water
discharges during construction at this site to be covered by the SPDES General Permit for Construction
Activity for the State of New York. A Notice of Intent (NOI) for coverage under this permit has been filed
by the Operator. The SWPPP must be prepared prior to submittal of the NOI form. The Operator will
require the Contractor to be a co-permittee with the Operator. The Contractor will be required to post
the NOI at the construction site along with any building permits.
E. CONTRACTOR CERTIFICATION & TRAINING: Proof of Training/Certification of the Contractor’s
designated individual shall be kept on site at all times.
F. REQUIREMENTS FOR THE GENERAL CONTRACTOR AND SUBCONTRACTOR(S): The General Contractor
and Subcontractor(s) shall sign the “Contractor’s Certification Statement” (located in the Appendix of this
report) verifying they have been instructed on how to comply with and fully understand the requirements
of the SPDES General Permit for Construction Activity for the State of New York and the SWPPP. These
certifications must be signed, by a responsible corporate officer or other party meeting the “Signatory
Requirements” of the SPDES General Permit, on behalf of each entity, prior to the beginning of any
construction activities.
G. STORM WATER POLLUTION PREVENTION PROGRAM LOCATION REQUIREMENTS: The SWPPP is meant to
be a working document that shall be maintained at the site of the Construction Activities at all times
throughout the project, shall be readily available upon request by the Operator’s personnel or NYSDEC or
any other agency with regulatory authority over storm water issues, and shall be kept on-site until the
site complies with the Final Stabilization section of this document. A sign or other notice must be posted
near the main entrance of the construction site which contains a completed NOI, the location of the
SWPPP and the name and phone number of a contact person responsible for scheduling SWPPP viewing
times, and any other state specific requirements.
H. INSPECTIONS AND RECORD-KEEPING:
A. General Construction Site Inspection and Maintenance Requirements
1. The owner or operator must ensure that all erosion and sediment control practices and
all post-construction stormwater management practices identified in the SWPPP are
maintained in effective operating condition at all times.
2. The terms of this permit shall not be construed to prohibit the State of New York from
exercising any authority pursuant to the ECL, common law or federal law, or prohibit
New York State from taking any measures, whether civil or criminal, to prevent
violations of the laws of the State of New York, or protect the public health and safety
and/or the environment.
B. Owner or operator Maintenance Inspection Requirements
1. The owner or operator shall inspect, in accordance with the requirements in the most
current version of the technical standard, New York State Standards and Specifications
Multifamily Development
5/26/26
Page 4 of 23
Page 857 of 1493
Page 858
for Erosion and Sediment Control, the erosion and sediment controls identified in the
SWPPP to ensure that they are being maintained in effective operating condition at all
times.
2. For construction sites where soil disturbance activities have been temporarily suspended
(e.g. winter shutdown) and temporary stabilization measures have been applied to all
disturbed areas, the owner or operator can stop conducting the maintenance
inspections. The owner or operator shall begin conducting the maintenance inspections
in accordance with Part IV.B.1. of the General Permit as soon as soil disturbance
activities resume.
3. For construction sites where soil disturbance activities have been shut down with partial
project completion, the owner or operator can stop conducting the maintenance
inspections if all areas disturbed as of the project shutdown date have achieved final
stabilization and all post-construction stormwater management practices required for
the completed portion of the project have been constructed in conformance with the
SWPPP and are operational.
C. Qualified inspector Inspection Requirements
The owner or operator shall have a qualified inspector conduct site inspections in conformance
with the following requirements:
Note: The trained contractor identified in Part III.A.6 of the General Permit cannot conduct the
qualified inspector site inspections unless they meet the qualified inspector qualifications
included in Appendix A of the General Permit. In order to perform these inspections, the trained
contractor would have to be a:
• Licensed Professional Engineer,
• Certified Professional in Erosion and Sediment Control (CPESC),
• Registered Landscape Architect, or
• Someone working under the direct supervision of, and at the same company as, the
licensed Professional Engineer or Registered Landscape Architect, provided they have
received four (4) hours of Department endorsed training in proper erosion and sediment
control principles from a Soil and Water Conservation District, or other Department
endorsed entity.
1. A qualified inspector shall conduct site inspections for all construction activities identified in
Tables 1 and 2 of Appendix B of the General Permit, with the exception of:
a. The construction of a single family residential subdivision with 25% or less impervious
cover at total site build-out that involves a soil disturbance of one (1) or more acres of
land but less than five (5) acres and is not located in one of the watersheds listed in
Appendix C of the General Permit and not directly discharging to one of the 303(d)
segments listed in Appendix E of the General Permit;
b. The construction of a single family home that involves a soil disturbance of one (1) or
more acres of land but less than five (5) acres and is not located in one of the
watersheds listed in Appendix C and not directly discharging to one of the 303(d)
segments listed in Appendix E of the General Permit;
Multifamily Development
5/26/26
Page 5 of 23
Page 858 of 1493
Page 859
c. Construction on agricultural property that involves a soil disturbance of one (1) or more
acres of land but less than five (5) acres; and
d. Construction activities located in the watersheds identified in Appendix D of the
General Permit that involve soil disturbances between five thousand (5000) square feet
and one (1) acre of land.
2. Unless otherwise notified by the Department, the qualified inspector shall conduct site
inspections in accordance with the following timetable:
a. For construction sites where soil disturbance activities are on-going, the qualified
inspector shall conduct a site inspection at least once every seven (7) calendar days.
b. For construction sites where soil disturbance activities are on-going and the owner or
operator has received authorization in accordance with Part II.C.3 of the General
Permit to disturb greater than five (5) acres of soil at any one time, the qualified
inspector shall conduct at least two (2) site inspections every seven (7) calendar days.
The two (2) inspections shall be separated by a minimum of two (2) full calendar days.
c. For construction sites where soil disturbance activities have been temporarily
suspended (e.g. winter shutdown) and temporary stabilization measures have been
applied to all disturbed areas, the qualified inspector shall conduct a site inspection
at least once every thirty (30) calendar days. The owner or operator shall notify the
Regional Office stormwater contact person (see contact information in Appendix F of
the General Permit) or, in areas under the jurisdiction of a regulated, traditional land
use control MS4, the MS4 (provided the MS4 is not the owner or operator of the
construction activity) in writing prior to reducing the frequency of inspections.
d. For construction sites where soil disturbance activities have been shut down with
partial project completion, the qualified inspector can stop conducting inspections if
all areas disturbed as of the project shutdown date have achieved final stabilization and
all post-construction stormwater management practices required for the completed
portion of the project have been constructed in conformance with the SWPPP and are
operational. The owner or operator shall notify the Regional Office stormwater contact
person or, in areas under the jurisdiction of a regulated, traditional land use control
MS4, the MS4 (provided the MS4 is not the owner or operator of the construction
activity). in writing prior to the shutdown. If soil disturbance activities are not resumed
within 2 years from the date of shutdown, the owner or operator shall have the
qualified inspector perform a final inspection and certify that all disturbed areas have
achieved final stabilization, and all temporary, structural erosion and sediment control
measures have been removed; and that all post-construction stormwater management
practices have been constructed in conformance with the SWPPP by signing the “Final
Stabilization” and “Post-Construction Stormwater Management Practice” certification
statements on the NOT. The owner or operator shall then submit the completed NOT
form to the address in Part II.A.1 of the General Permit.
3. At a minimum, the qualified inspector shall inspect all erosion and sediment control practices to
ensure integrity and effectiveness, all post-construction stormwater management practices
under construction to ensure that they are constructed in conformance with the SWPPP, all areas
of disturbance that have not achieved final stabilization, all points of discharge to natural
surface waterbodies located within, or immediately adjacent to, the property boundaries of the
construction site, and all points of discharge from the construction site.
Multifamily Development
5/26/26
Page 6 of 23
Page 859 of 1493
Page 860
4. The qualified inspector shall prepare an inspection report subsequent to each and every
inspection. At a minimum, the inspection report shall include and/or address the following:
a. Date and time of inspection;
b. Name and title of person(s) performing inspection;
c. A description of the weather and soil conditions (e.g. dry, wet, saturated) at the time of
the inspection;
d. A description of the condition of the runoff at all points of discharge from the
construction site. This shall include identification of any discharges of sediment from
the construction site. Include discharges from conveyance systems (i.e. pipes, culverts,
ditches, etc.) and overland flow;
e. A description of the condition of all natural surface waterbodies located within, or
immediately adjacent to, the property boundaries of the construction site which receive
runoff from disturbed areas. This shall include identification of any discharges of
sediment to the surface waterbody;
f. Identification of all erosion and sediment control practices that need repair or
maintenance;
g. Identification of all erosion and sediment control practices that were not installed
properly or are not functioning as designed and need to be reinstalled or replaced;
h. Description and sketch of areas that are disturbed at the time of the inspection and
areas that have been stabilized (temporary and/or final) since the last inspection;
i. Current phase of construction of all post-construction stormwater management
practices and identification of all construction that is not in conformance with the
SWPPP and technical standards;
j. Corrective action(s) that must be taken to install, repair, replace or maintain erosion
and sediment control practices; and to correct deficiencies identified with the
construction of the post-construction stormwater management practice(s); and
k. Digital photographs, with date stamp, that clearly show the condition of all practices
that have been identified as needing corrective actions. The qualified inspector shall
attach paper color copies of the digital photographs to the inspection report being
maintained onsite within seven (7) calendar days of the date of the inspection. The
qualified inspector shall also take digital photographs, with date stamp, that clearly
show the condition of the practice(s) after the corrective action has been completed.
The qualified inspector shall attach paper color copies of the digital photographs to the
inspection report that documents the completion of the corrective action work within
seven (7) calendar days of that inspection.
5. Within one business day of the completion of an inspection, the qualified inspector shall notify
the owner or operator and appropriate contractor or subcontractor identified in Part III.A.6. of
any corrective actions that need to be taken. The contractor or subcontractor shall begin
implementing the corrective actions within one business day of this notification and shall
complete the corrective actions in a reasonable time frame.
Multifamily Development
5/26/26
Page 7 of 23
Page 860 of 1493
Page 861
6. All inspection reports shall be signed by the qualified inspector. Pursuant to Part II.C.2 of the
General Permit, the inspection reports shall be maintained on site with the SWPPP.
Record Retention - The owner or operator shall retain a copy of the NOI, NOI Acknowledgment Letter,
SWPPP, MS4 SWPPP Acceptance form and any inspection reports that were prepared in conjunction with
this permit for a period of at least five (5) years from the date that the site achieves final stabilization.
This period may be extended by the Department, in its sole discretion, at any time upon written
notification.
I. SWPPP MODIFICATIONS: The inspection report should also identify if any revisions to the SWPPP are
warranted due to unexpected conditions. The SWPPP is meant to be a dynamic working guide that is to
be kept current and amended whenever there is a change in design, construction, operation, or
maintenance at the construction site that has or could have a significant effect on the discharge of
pollutants or when the plan proves to be ineffective in eliminating or significantly minimizing pollutant
discharges. The Contractor’s failure to modify or report deficiencies to the Operator will result in the
Contractor being liable for fines and construction delays resulting from any federal, state, or local agency
enforcement action.
J. FINAL STABILIZATION AND TERMINATION OF PERMIT COVERAGE: A site can be considered finally
stabilized when all soil disturbing activities have been completed and a uniform perennial vegetative
cover with a density of 85% for the unpaved areas and areas not covered by permanent structures has
been established or equivalent permanent stabilization measures have been established and the facility
no longer discharges storm water associated with construction activities and a Notice of Termination
(NOT) form filed by the Operator(s) with the NYSDEC. The Operator’s Project Manager must complete the
NOT. The NOT must be signed by the signatory (or equivalent position) on the NOI and subsequently
submitted to the appropriate agency. The Operator’s Project Manager must provide a completed copy of
the NOT to the Contractor for inclusion in the SWPPP, which will then be optically scanned into the final
SWPPP document as required. This filing terminates coverage under the General Permit and terminates
the Contractor’s responsibility to implement the SWPPP, but the requirements of the SWPPP, including
periodic inspections, must be continued until the NOT is filed. The owner or operator shall also have the
qualified inspector perform a final site inspection prior to submitting the NOT to the Department. Final
payment and/or the release of retainage will be withheld until all provisions of the SWPPP have been
submitted, completed and accepted by the Operator.
102 PROJECT NAME AND LOCATION
Multifamily Development
1425 & 1475 Orchard Park Road
Town of West Seneca, County of Erie, New York
Easting: 192275
Northing: 4746778
Estimated Area of Site ≈ 16.59 acres
Estimated Area to be disturbed by Construction Activities ≈ 7.37 acres
A general location map is included as Appendix A.
103 OPERATOR’S NAME AND ADDRESS
Brian Hillery & William Sahlem
Multifamily Development
5/26/26
Page 8 of 23
Page 861 of 1493
Page 862
1 Woodthrush Trail
Orchard Park, NY 14127
Contact Person: Brian Hillery
Telephone: 716-512-3425
104 PROJECT DESCRIPTION
This new development project involves the construction of three (3) 4-unit, one (1) 5-unit and two (2) 6-
unit ranch style townhomes, for a total of 29 units. Construction will also consist of associated parking,
storm water management, utility, lighting, and landscaping improvements. The site is currently vacant
consisting of grass, brush and tree cover. The total area of the site is 16.59 acres with an area of
disturbance of approximately 7.37 acres. The site has been rezoned to C-1(S) to allow for the
development.
Soil disturbing activities will include:
A. Construction of temporary construction exit points
B. Clearing & grubbing of the site within disturbance limits
C. Installation of the detention basin & bioretention areas including topsoil & seed
D. Installation of storm sewer pipes and inlets
E. Construction of utilities
F. Construction of curb and parking lot
G. Final grading & landscaping
H. Construction of buildings
This project is owned by Brian Hillery and William Sahlem and will be developed by the same. The work
area consists of approximately 7.37 acres for which erosion and sediment controls have been developed
and fully addressed in this written plan and the Erosion and Sediment Control Plans. See the construction
documents for additional details.
105 RUNOFF COEFFICIENT, SOILS, AND RAINFALL INFORMATION
The initial runoff curve number for the pre-construction site is "CN" = 80. The post-construction runoff
curve number for the site will be "CN" = 88. The site is 7.37 acres of which approximately 7.37 acres will
be disturbed by construction activities.
The site is in Erie County, which receives an average of approximately 45 inches rainfall annually with the
highest amounts of rainfall received in the months of May through September. Annual snow for this area
is approximately 120 inches.
106 WATERS
The runoff generated from this site will discharge to existing wetlands on the west side of the project
site. Runoff is eventually discharged to Smoke Creek.
Multifamily Development
5/26/26
Page 9 of 23
Page 862 of 1493
Page 863
107 INDIAN COUNTRY LANDS
This project is not located on Indian Lands.
108 ENDANGERED AND THREATENED SPECIES
No endangered or threatened species have been determined to be on the site.
109 CRITICAL HABITAT
See section 108 above.
110 HISTORIC PLACES
The assessed property is shown on the NYSHPO map as an archeologically sensitive area. A Phase I
Cultural Resource Investigation Report was prepared for the site.
Refer to Appendix K for OPRHP Clearance Letter
111 WETLANDS AND/OR OTHER SURFACE WATERS
Approximately 5.60 acres of USACE wetlands were delineated on site. The proposed development will not
encroach on nor disturb the wetlands.
Refer to Appendix J for Wetland Delineation Figure: by LaBella
112 EROSION AND SEDIMENT CONTROLS
112.1 STABILIZATION PRACTICES
Stabilization practices for this site include:
A. Land clearing activities shall be done only in areas where earthwork will be performed and shall
progress as earthwork is needed.
B. Use of stabilization method for all slopes having a slope greater than 1V:3H.
C. Permanent seeding and planting of all unpaved areas using the hydromulching grass seeding
technique.
D. Mulching exposed areas.
E. Vegetation preservation in undisturbed areas.
F. Frequent watering to minimize wind erosion during construction.
a. For sites where 5 acres or more are disturbed at any one time: In areas where soil
disturbance activity has been temporarily or permanently ceased, temporary and/or
permanent soil stabilization measures shall be installed and/or implemented within
seven (7) days from the date the soil disturbance activity ceased. The soil stabilization
measures selected shall be in conformance with the most current version of the New
York Standards and Specifications for Erosion and Sediment Control.
b. The owner or operator shall prepare a phasing plan that defines maximum disturbed
area per phase and shows required cuts and fills.
Multifamily Development
5/26/26
Page 10 of 23
Page 863 of 1493
Page 864
c. The owner or operator shall install any additional measures needed to protect water
quality.
112.2 STRUCTURAL PRACTICES
Structural practices for this site include:
A. Inlet protection using a method detailed in the Construction Documents.
B. Perimeter protection using temporary silt fence/silt sock or silt sock.
C. Outlet protection using rip-rap stone and end sections.
D. Stabilized Construction Entrance.
E. Temporary stone wash off areas.
F. Storm sewer, curb/gutter.
G. Sediment traps and basins.
112.3 SEQUENCE OF MAJOR ACTIVITIES
The Contractor will be responsible for implementing the following erosion control and storm water
management control measures. The Contractor may designate these tasks to certain subcontractors as he
sees fit, but the ultimate responsibility for implementing these controls and ensuring their proper
functioning remains with the Contractor. The order of activities will be as follows:
A. Construct temporary construction exit at location shown on the Demo & Erosion Control Plan Sheet.
B. Install perimeter silt fences in the locations shown on the Demo & Erosion Control Plan sheet.
C. Clear and grub site within disturbance (silt fence) limits.
D. Installation of detention basin to act as sediment basin (do not install bioretention soil or underdrains
until stabilized)
E. Commence site grading.
F. Disturbed areas of the site where construction activity has ceased for more than 14 days shall be
temporarily seeded and watered.
G. Construction of buildings.
H. Installation of proposed utilities.
I. Finalize pavement subgrade preparation.
J. Construct all curb, drainage inlets, storm sewer pipes and storm sewer manholes, as shown on the
plans. Install temporary inlet protection at the locations of all new inlets.
K. Dust control.
L. Remove inlet protection around inlets and manholes no more than 48 hours prior to placing stabilized
base course.
M. Install base material as required for pavement.
Multifamily Development
5/26/26
Page 11 of 23
Page 864 of 1493
Page 865
N. Carry out final grading and seeding and planting.
O. Clean storm system following construction.
P. Remove silt fencing only after all paving is complete and exposed surfaces are stabilized.
Note: Sediment control storage during construction (traps & basins) during construction shall be 134 cy
per acre of disturbance per NYSDEC requirements.
112.4 STORM WATER MANAGEMENT
The existing site sheet drains from east to west to a USACE jurisdictional wetland area at the rear of the
site.
The proposed development will replicate the existing hydrology of the site. The proposed hydrology for
the development project area will consist of overland sheet flow and pipe channel flow. The storm sewer
system for this site will consist of 6”, 8” and 12” HDPE pipes connected by a series of catch basins and
yard drains. Stormwater runoff generated from the site will enter the pipe network and be conveyed to a
detention basin on the west side of the site. The detention basin will discharge runoff, at a controlled
rate, to the existing wetlands. To meet NYSDEC water quality requirements, runoff will be conveyed to a
bioretention areas prior to the detention basin. Runoff that is currently being discharged on to the site
from the church parking lot to the east will be collected and piped to the west side of the site.
The NYSDEC Stormwater Management Design Manual requires a five-step process for Stormwater
Management Planning as outlined in Chapter 3. The five steps include:
1. Site planning to preserve natural features and reduce impervious cover.
• Approximately 5.6 acres of existing vegetation within the existing wetlands will remain
and be protected.
2. Calculation of Water Quality Volume (WQv=RRv) for site.
• See Stormwater Drainage Calculations.
3. Incorporation of Green Infrastructure techniques and standard SMPs with Runoff Reduction
Volume (RRv) capacity.
• Bioretention areas were incorporated into the site design to provide required RRv for
the development. See Stormwater Drainage Calculations.
4. Use of standard SMPs where applicable, to treat the portion of water quality volume not
addressed by green infrastructure techniques and standard SMPs with RRv capacity.
• The bioretention areas serve to the treat the remaining WQv.
5. Design of volume and peak rate control practices where required.
• See Stormwater Drainage Calculations.
The NYSDEC Stormwater Management Design Manual requires (5) five different criteria be considered
when designing a stormwater management system. Those criteria are Water Quality, Runoff
Reduction Volume, Channel Protection, Overbank Flooding and Extreme Storm Protection. Below is a
summary of each item and how it is incorporated into this project.
Multifamily Development
5/26/26
Page 12 of 23
Page 865 of 1493
Page 866
Water Quality & Runoff Reduction Volume:
The NYSDEC requires reduction of the total water quality volume by green infrastructure techniques and
SMP’s to replicate pre-development hydrology. Bioretention areas were incorporated into the site layout
to provide the required RRv for contributing WQv runoff area for the development. The bioretention
areas will provide 4,378 cf RRv. The minimum RRv required is 2,047 cf. The bioretention areas will also
treat 6,349 cf of WQv. The required WQv = 10,727 cf. The sum of the WQv treated and the RRv is equal
to the required WQv, therefore the practice is acceptable.
Channel Protection:
The NYSDEC requires that 24-Hour extended detention be provided for the proposed 1-year storm event.
A volume of 5,335 cf is accommodated in the detention basin at elevation 671.04.
Overbank Flooding:
The NYSDEC requires that the 10-year proposed storm event be attenuated with detention and that the
outlet be restricted to the 10-year existing storm event. A volume of 15,013 cf is accommodated in the
detention basin at elevation 672.95.
Extreme Storm Protection:
The NYSDEC requires that the 100-year proposed storm event be attenuated with detention and that the
outlet be restricted to the 100-year existing storm event. A volume of 34,966 cf is accommodated in the
detention basin at elevation 674.73.
Refer to the engineer’s report for storm sewer design criteria, runoff summary tables and stormwater
drainage calculations.
113 OTHER CONTROLS
113.1 OFF-SITE VEHICLE TRACKING
A stabilized construction exit will be provided to help reduce vehicle tracking of sediments. Existing
paved areas will remain as long as possible and will be used for vehicle wash areas and to further aid in
the reduction of vehicle tracking of sediments. The paved streets adjacent to the site entrance shall be
inspected daily and swept as necessary to remove any excess mud, dirt, or rock tracked from the site.
Dump trucks hauling material to/from the construction site will be covered with a tarpaulin. The job site
superintendent will be responsible for seeing that these procedures are followed.
113.2 EXCAVATION SPOIL MATERIALS
Excavation spoil materials are generated during the excavation of the development’s building and utilities
installation. These materials must be properly managed to prevent them from contributing to storm
water discharges. The materials generated from the development of this project will be hauled off-site
or stockpiled for re-use in designated areas which will have temporary erosion & sediment control
measures installed. Any removal from site will be done under the necessary permits required by the local
governing agencies.
113.3 DUST CONTROL
Minimizing wind erosion and controlling dust will be accomplished by one or more of the following
methods:
Multifamily Development
5/26/26
Page 13 of 23
Page 866 of 1493
Page 867
A. Frequent watering of excavation and fill areas.
B. Providing gravel or paving at entrance/exit drives, parking areas and transit paths.
113.4 WASTE DISPOSAL
If needed, all waste materials will be collected and stored in securely lidded metal dumpsters rented
from an approved waste management company. The dumpster will comply with all local and state solid
waste management regulations.
All trash and construction debris from the site will be deposited in the dumpsters. The dumpsters will be
emptied when full and then hauled to a NYSDEC approved landfill for proper disposal. No construction
waste will be buried on-site. All personnel will be instructed regarding the correct procedures for waste
disposal.
113.5 SANITARY WASTE
If needed, portable toilet units or field offices with toilet facilities connected to the municipal sanitary
sewer will be used for sanitary purposes. All portable toilet units will be emptied a minimum of once per
week by a licensed portable facility provided in compliance with local and state regulations.
113.6 CONCRETE WASTE FROM CONCRETE TRUCKS
A. Emptying of excess unhardened concrete and/or washout from concrete delivery trucks will be
allowed on the job site, but in either (1) specifically designated diked areas which have been
prepared to prevent contact between concrete and/or washout and storm water which will be
discharged from the site or (2) in locations where waste concrete will be poured into forms to
make rip-rap or other useful concrete products.
B. Hardened waste concrete from the designated diked areas described above will be disposed of in
accordance with applicable local and state regulations with regards to disposal of construction
debris.
113.7 HAZARDOUS SUBSTANCES & HAZARDOUS WASTE
A. All hazardous waste materials will be disposed of by the Contractor in the manner specified by
local, state, and/or federal regulations and by the manufacturer of such products. Site
personnel will be instructed in these practices by the job superintendent, who will also be
responsible for seeing these practices are followed. Material Safety Data Sheets (MSDS’s) for
each substance with hazardous properties that is used on the job site will be obtained and used
for the proper management of potential wastes that may result from these products. An MSDS
will be posted in the immediate area where such products are stored and/or used and another
copy of each MSDS will be maintained in the SWPPP file at the job site construction office. Each
employee who must handle a substance with hazardous properties will be instructed on the use
of MSDS sheets and the specific information in the applicable MSDS for the product he/she is
using, particularly regarding spill control techniques.
B. The contractor will implement the Spill Prevention Control and Countermeasures (SPCC) Plan
found within this SWPPP and will train all personnel in the proper cleanup and handling of spilled
materials. No spilled hazardous materials of hazardous wastes will be allowed to come in
contact with storm water discharges. If such contact occurs, the storm water discharge shall be
contained on site until appropriate measures in compliance with state and federal regulations
are taken to dispose of such contaminated storm water. It shall be the responsibility of the job
superintendent to properly train all personnel in the use of the SPCC plan.
Multifamily Development
5/26/26
Page 14 of 23
Page 867 of 1493
Page 868
C. Any spills of hazardous materials which are in excess of the Reportable Quantities as defined by
the EPA regulations shall be immediately reported to the EPA National Response Center at 1-100-
424-1102. From SWPPP-9 “Reportable Quantity Release Form” must be filled out.
D. In order to minimize the potential for a spill of hazardous materials to come in contact with
storm water, the following steps will be implemented:
1. All materials with hazardous properties (such as pesticides, petroleum products,
fertilizers, detergents, construction chemicals, acids, paints, paint solvents, cleaning
solvents, additives for soil stabilization, concrete curing compounds and additives, etc.)
will be stored in a secure location, under cover, when not in use.
2. The minimum practical quantity of all such materials will be kept on the job site.
3. A spill control and containment kit (containing for example, absorbent such as kitty
litter or sawdust, acid neutralizing powder, brooms, dust pans, mops, rags, gloves,
goggles, plastic and metal trash containers, etc.) will be provided at the storage site.
4. All of the product in a container will be used before the container is disposed of. All
such containers will be triple rinsed with water prior to disposal. The rinse water used
in these containers will be disposed of in a manner in compliance with state and federal
regulations and will not be allowed to mix with storm water discharges.
5. All products will be stored in and used from the original container with the original
product label.
6. All products will be used in strict compliance with instructions on the product label.
7. The disposal of excess or used products will be in strict compliance with instructions on
the product label.
113.8 CONTAMINATED SOILS
A. Any contaminated soils (resulting from spills of materials with hazardous properties) which may
result from construction activities will be contained and cleaned up immediately in accordance
with the procedures given in the Spill Prevention Control and Countermeasures (SPCC) Plan and
in accordance with applicable state and federal regulations.
B. The job site superintendent will be responsible for seeing that these procedures are followed.
114 COMPLIANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS
The Contractor will obtain copies of any and all local and state regulations which are applicable to storm
water management, erosion control, and pollution minimization at this job site and will comply fully with
such regulations. The Contractor will submit written evidence of such compliance if requested by the
Operator or any agent of a regulatory body. The Contractor will comply with all conditions of the SPDES
General Permit for Construction Activity for the State of New York, including the conditions related to
maintaining the SWPPP and evidence of compliance with the SWPPP at the job site and allowing
regulatory personnel access to the job site and to records in order to determine compliance.
The SWPPP for this site development project requires regulated MS4 approval from the Town of West
Seneca. All changes to the SWPPP must be approved by the Town of West Seneca prior to applying
changes to the SWPPP in the field.
Multifamily Development
5/26/26
Page 15 of 23
Page 868 of 1493
Page 869
115 INSPECTION AND MAINTENANCE PROCEDURES
The following inspection and maintenance practices will be used to maintain erosion and sediment
controls and stabilization measures.
1. All control measures will be inspected by the owner/operator at least weekly and shall continue
until the site complies with the Final Stabilization section of this document (See Section 116).
2. All control measures will be inspected by a Qualified Professional at least weekly and shall
continue until the site complies with the Final Stabilization section of this document (See Section
116).
3. All measures will be maintained in good working order; if repairs or other measures are found to
be necessary, they will be initiated within 24 hours of report.
4. Built up sediment will be removed from silt fence/silt sock when it has reached one-third the
height of the fence.
5. Silt fence/silt socks will be inspected for depth of sediment, tears, etc., to see if the fabric is
securely attached to the fence posts, and to see that the fence posts are securely in the ground.
6. Temporary and permanent seeding and all other stabilization measures will be inspected for bare
spots, washouts, and healthy growth.
7. A maintenance inspection report will be made after each inspection. Copies of the report forms
to be completed by the inspector are included in this SWPPP.
8. The job site superintendent will be responsible for selecting and training the individuals who will
be responsible for these inspections, maintenance and repair activities, and filling out inspection
and maintenance reports.
9. Personnel selected for the inspection and maintenance responsibilities will receive training from
the job site superintendent. They will be trained in all the inspection and maintenance practices
necessary for keeping the erosion and sediment controls that are used onsite in good working
order. They will also be trained in the completion of, initiation of actions required by, and the
filing of the inspection forms. Documentation of this personnel training will be kept on site with
the SWPPP.
10. Disturbed areas and materials storage areas will be inspected for evidence of or potential for
pollutants entering stormwater systems.
11. Report to the NYSDEC within 24 hours any noncompliance with the SWPPP that will endanger
public health or the environment. Follow up with a written report within 5 days of the
noncompliance event. The following events require 24 hour reporting: a) any unanticipated
bypass which exceeds any effluent limitation in the permit, b) any upset which exceeds any
effluent limitation in the permit, and c) a violation of a maximum daily discharge limitation for
any of the pollutants listed by the NYSDEC in the permit to be reported within 24 hours. The
written submission must contain a description of the non-compliance and its cause; the period of
non-compliance, including exact dates and times, and if the non-compliance has not been
corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce,
eliminate, and prevent recurrence of the non-compliance.
12. Releases of hazardous substances or oil in excess of reportable quantities (as established under
40 CFR 110, 40 CFR 117 or 40 CFR 302) must be reported.
Multifamily Development
5/26/26
Page 16 of 23
Page 869 of 1493
Page 870
Upon completion of construction, the property owner is responsible for ensuring that the stormwater
facilities are regularly inspected and maintained. Maintenance and inspection procedures are as follows.
1. On a quarterly basis and following significant rainfall events or snow-melts, perform the
following:
• Inspect catch basins, storm manholes, treatment structures, storm piping and
stormwater pond for debris and accumulation of sediment.
• Remove and properly dispose of any collected debris and sediment in accordance with
applicable state, federal and local regulations.
• Flush piping with water if necessary to remove accumulated sediment.
• Bioretention areas shall be maintained per the NYSDEC Maintenance and Management
Checklist included in this SWPPP.
• Check all stone outfall structures for erosion and re-stone if necessary to prevent
further erosion.
• Inspect grassed/landscaped areas for un-vegetated areas or areas with less than 85%
healthy stand of grass and reseed and mulch as necessary. Water daily if reseeded in
July and August.
• A record of all inspections should be kept.
2. Maintain all lawn areas by regular mowing, including the grassed slopes of the stormwater pond
and any grass swales. Any eroded areas shall be regarded, seeded and mulched immediately.
116 INSPECTION AND MAINTENANCE REPORT FORMS
Once installation of any required or optional erosion control device or measure has been implemented,
inspections shall be performed by a Qualified Professional at least once every seven (7) calendar days.
For construction sites where soil disturbance activities are on-going and the owner or operator has
received authorization in accordance with Part II.C.3 of the General Permit to disturb greater than five
(5) acres of soil at any one time, the qualified inspector shall conduct at least two (2) site inspections
every seven (7) calendar days. The two (2) inspections shall be separated by a minimum of two (2) full
calendar days. The owner and contractor shall obtain from the MS4 an approval for disturbing more than
five-acres at any given time. For construction sites where active construction has been suspended,
inspection frequency under the general permit can be reduced to once every 30 days, provided temporary
stabilization measures have been applied to all disturbed areas. The forms found in this SWPPP shall be
used by the inspectors to inventory and report the condition of each measure to assist in maintaining the
erosion and sediment control measures in good working order.
These report forms shall become an integral part of the SWPPP and shall be made readily accessible to
governmental inspection officials, the Operator’s Engineer, and the Operator for review upon request
during visits to the project site. In addition, copies of the reports shall be provided to any of these
persons, upon request, via mail or facsimile transmission. Inspection and maintenance report forms are to
be maintained by the permittee for five years following the final stabilization of the site.
117 OTHER RECORD-KEEPING REQUIREMENTS
The Contractor shall keep the following records related to construction activities at the site:
Multifamily Development
5/26/26
Page 17 of 23
Page 870 of 1493
Page 871
• Dates when major grading activities occur and the areas which were graded
• Dates and details concerning the installation of structural controls
• Dates when construction activities cease in an area
• Dates when an areas is stabilized, either temporarily or permanently
• Dates of rainfall and the amount of rainfall
• Dates and descriptions of the character and amount of any spills of hazardous materials
• Records of reports filed with regulatory agencies if reportable quantities of hazardous materials
spilled
118 SPILL PREVENTION CONTROL AND COUNTERMEASURES (SPCC) PLAN
118.1 MATERIALS COVERED
The following materials or substances are expected to be present onsite during construction:
• Concrete/Additives/Wastes
• Cleaning solvents
• Sanitary wastes
• Detergents
• Petroleum based products
• Paints/Solvents
• Pesticides
• Solid and construction wastes
• Acids
• Fertilizers
• Soil stabilization additives
118.2 MATERIAL MANAGEMENT PRACTICES
The following are the material management practices that will be used to reduce the risk of spills or
other accidental exposure of materials and substances to stormwater runoff. The job site superintendent
will be responsible for ensuring that these procedures are followed.
A. Good Housekeeping
The following good housekeeping practices will be followed onsite during the construction
project.
1. An effort will be made to store only enough products required to do the job.
2. All materials stored onsite will be stored in a neat, orderly manner and, if possible,
under a roof or in a containment area. At a minimum, all containers will be stored with
their lids on when not in use. Drip pans shall be provided under all dispensers.
3. Products will be kept in their original containers with the original manufacturer's label
in legible condition.
4. Substances will not be mixed with one another unless recommended by the
manufacturer.
5. Whenever possible, all of a product will be used up before disposing of the container.
Multifamily Development
5/26/26
Page 18 of 23
Page 871 of 1493
Page 872
6. Manufacturer's recommendations for proper use and disposal will be followed.
7. The job site superintendent will be responsible for daily inspections to ensure proper
use and disposal of materials.
B. Hazardous Products
These practices will be used to reduce the risks associated with hazardous materials. Material
Safety Data Sheets (MSDS's) for each substance with hazardous properties that is used on the job
site will be obtained and used for the proper management of potential wastes that may result
from these products. An MSDS will be posted in the immediate area where such product is stored
and/or used and another copy of each MSDS will be maintained in the SWPPP file at the job site
construction trailer office. Each employee who must handle a substance with hazardous
properties will be instructed on the use of MSDS sheets and the specific information in the
applicable MSDS for the product he/she is using, particularly regarding spill control techniques.
1. Products will be kept in original containers with the original labels in legible condition.
2. Original labels and material safety data sheets (MSDS's) will be procured and used for
each material.
3. If surplus product must be disposed of, manufacturer's or local/state/federal
recommended methods for proper disposal will be followed.
4. A spill control and containment kit (containing for example, absorbent such as kitty
litter or sawdust, acid neutralizing powder, brooms, dust pans, mops, rags, gloves,
goggles, plastic and metal trash containers, etc.) will be provided at the storage site.
5. All of the product in a container will be used before the container is disposed of. All
such containers will be triple rinsed with water prior to disposal. The rinse water used
in these containers will be disposed of in a manner in compliance with state and federal
regulations and will not be allowed to mix with storm water discharges.
C. Hazardous Waste
All hazardous waste materials will be disposed of by the Contractor in the manner specified by
local, state, and/or federal regulations and by the manufacturer of such products. Site
personnel will be instructed in these practices by the job site superintendent, who will also be
responsible for seeing that these practices are followed.
D. Product Specific Practices
The following product specific practices will be followed on the job site.
1. Petroleum Products
All onsite vehicles will be monitored for leaks and receive regular preventative
maintenance to reduce the chance of leakage. Petroleum products will be stored in
tightly sealed containers which are clearly labeled. Any petroleum storage tanks stored
onsite will be located within a containment area that is designed with an impervious
surface between the tank and the ground. The secondary containment must be
designed to provide a containment volume that is equal to 110% of the volume of the
largest tank. Drip pans shall be provided for all dispensers. Any asphalt substances
used onsite will be applied according to the manufacturer's recommendations. The
Multifamily Development
5/26/26
Page 19 of 23
Page 872 of 1493
Page 873
location of any fuel tanks and/or equipment storage areas must be identified on a plan
by the contractor once the locations have been determined.
2. Fertilizers
Fertilizers will be applied only in the minimum amounts recommended by the
manufacturer. Once applied, fertilizer will be worked in the soil to limit exposure to
stormwater. Storage will be in a covered shed. The contents of any partially used bags
of fertilizer will be transferred to a sealable plastic bin to avoid spills.
3. Paints, Paint Solvents, and Cleaning Solvents
All containers will be tightly sealed and stored when not in use. Excess paint and
solvents will not be discharged to the storm sewer system but will be properly disposed
of according to manufacturer's instructions or state and federal regulations.
4. Concrete Wastes
Concrete trucks will be allowed to wash out or discharge surplus concrete or drum wash
water on the site, but only in either (1) specifically designated diked areas which have
been prepared to prevent contact between the concrete and/or wash out and storm
water which will be discharged from the site or (2) in locations where waste concrete
can be poured into forms to make riprap or other useful concrete products.
The hardened residue from the concrete wash out diked areas will be disposed of in the
same manner as other non-hazardous construction waste materials or may be broken up
and used on site as deemed appropriate by the Contractor. The job site superintendent
will be responsible for seeing that these procedures are followed.
All concrete wash out areas will be located in an area where the likelihood of the area
contributing to storm water discharges is negligible. If required, additional BMPs must
be implemented to prevent concrete wastes from contributing to storm water
discharges. The location of concrete wash out area(s) must be identified on a plan by
the contractor once the locations have been determined. In addition, a standard detail
on the construction of the concrete wash out shall be included on this plan.
E. Solid and Construction Wastes
All waste materials will be collected and stored in an appropriately covered container and/or
securely lidded metal dumpster rented from a local waste management company which must be
a solid waste management company licensed to do business in New York and the Town of Orchard
Park. The dumpster will comply with all local and state solid waste management regulations.
All trash and construction debris from the site will be deposited in the dumpster. The dumpster
will be emptied a minimum of twice per week or more often if necessary, and the trash will be
hauled to a landfill approved by the NYSDEC. No construction waste materials will be buried on
site. All personnel will be instructed regarding the correct procedures for waste disposal.
All waste dumpsters and roll-off containers will be located in an area where the likelihood of the
containers contributing to storm water discharges is negligible. If required, additional BMPs must
be implemented, such as sandbags around the base, to prevent wastes from contributing to
storm water discharges. The location of waste dumpsters and roll-off containers must be
identified on a plan by the contractor once the locations have been determined.
Multifamily Development
5/26/26
Page 20 of 23
Page 873 of 1493
Page 874
F. Sanitary Wastes
Portable toilet units or field offices with toilet facilities connected to the municipal sanitary
sewer will be used for sanitary purposes. All portable toilet units will be emptied a minimum of
once per week by a licensed portable facility provided in compliance with local and state
regulations.
All sanitary waste units will be located in an area where the likelihood of the unit contributing to
storm water discharges is negligible. If required, additional BMPs must be implemented, such as
sandbags around the base, to prevent wastes from contributing to storm water discharges. The
location of sanitary waste units must be identified on a plan by the contractor once the locations
have been determined.
G. Contaminated Soils
Any contaminated soils (resulting from spills of materials with hazardous properties) which may
result from construction activities will be contained and cleaned up immediately in accordance
with the procedures given in the Materials Management Plan and in accordance with applicable
state and federal regulations.
118.3 SPILL PREVENTION AND RESPONSE PROCEDURES
The Contractor will train all personnel in the proper handling and cleanup of spilled materials.
No spilled hazardous materials or hazardous wastes will be allowed to come in contact with
storm water discharges. If such contact occurs, the storm water discharge will be contained on
site until appropriate measures in compliance with state and federal regulations are taken to
dispose of such contaminated storm water. It shall be the responsibility of the job site
superintendent to properly train all personnel in spill prevention and clean up procedures.
A. In order to minimize the potential for a spill of hazardous materials to come into contact with
storm water, the following steps will be implemented:
1. All materials with hazardous properties (such as pesticides, petroleum products,
fertilizers, detergents, construction chemicals, acids, paints, paint solvents, cleaning
solvents, additives for soil stabilization, concrete curing compounds and additives, etc.)
will be stored in a secure location, with their lids on, preferably under cover, when not
in use.
2. The minimum practical quantity of all such materials will be kept on the job site.
3. A spill control and containment kit (containing, for example, absorbent materials, acid
neutralizing powder, brooms, dust pans, mops, rags, gloves, goggles, plastic and metal
trash containers, etc.) will be provided at the storage site.
4. Manufacturer's recommended methods for spill cleanup will be clearly posted and site
personnel will be trained regarding these procedures and the location of the information
and cleanup supplies.
B. In the event of a spill, the following procedures should be followed
1. All spills will be cleaned up immediately after discovery.
2. The spill area will be kept well ventilated and personnel will wear appropriate
protective clothing to prevent injury from contact with the hazardous substances.
Multifamily Development
5/26/26
Page 21 of 23
Page 874 of 1493
Page 875
3. The project manager and the Engineer of Record will be notified immediately.
Spills of toxic or hazardous materials will be reported to the appropriate federal, state,
and/or local government agency, regardless of the size of the spill. Spills of amounts
that exceed Reportable Quantities of certain substances specifically mentioned in
federal regulations (40 CFR 110, 40 CFR 117, and 40 CFR 302) must be immediately
reported to the EPA National Response Center, telephone 1-100-424-1102. From SWPPP-
9 “Reportable Quantity Release Form” must be filled out.
4. If the spill exceeds a Reportable Quantity, the SWPPP must be modified within seven (7)
calendar days of knowledge of the discharge to provide a description of the release, the
circumstances leading to the release, and the date of the release. The plans must
identify measures to prevent the recurrence of such releases and to respond to such
releases.
C. The job site superintendent will be the spill prevention and response coordinator. He will
designate the individuals who will receive spill prevention and response training. These
individuals will each become responsible for a particular phase of prevention and response. The
names of these personnel will be posted in the material storage area and in the office trailer
onsite.
119 CONTROL OF NON-STORM WATER DISCHARGES
Certain types of discharges are allowable under the NYSDEC SPDES General Permit for Construction
Activity for the State of New York, and it is the intent of this SWPPP to allow such discharges. These
types of discharges will be allowed under the conditions that no pollutants will be allowed to come in
contact with the water prior to or after its discharge. The control measures which have been outlined
previously in this SWPPP will be strictly followed to ensure that no contamination of these non-storm
water discharges takes place. The following allowable non-storm water discharges which may occur at
the job site include:
A. Discharges from firefighting activities.
B. Fire hydrant flushings (see note below)
C. Waters used to wash vehicles or control dust in order to minimize offsite sediment tracking.
D. Routine external building washdown which does not use detergents.
E. Pavement wash waters where spills or leaks of hazardous materials have not occurred or
detergents have not been used.
F. Air conditioning condensate.
G. Springs or other uncontaminated groundwater, including dewatering ground water infiltration.
H. Foundation or footing drains where no contamination with process materials such as solvents is
present.
Note: The Contractor shall discharge any super-chlorinated water from water distribution pipe
disinfection activities into sanitary sewer system
Multifamily Development
5/26/26
Page 22 of 23
Page 875 of 1493
Page 876
120 STORM WATER CONTROL FACILITY MAINTENANCE
The frequency of inspections for the bioretention areas shall match the frequencies listed on the
“Bioretention Operation, Maintenance and Management Inspection Checklist” in Appendix L of the SWPPP.
The proposed catch basins, as per section 115, shall be inspected 4 times per year for removal of
floatable debris. Any silt buildup over 6” in depth shall be removed and disposed of properly off-site.
Multifamily Development
5/26/26
Page 23 of 23
Page 876 of 1493
Page 877
Appendix A
Site Location Map
Page 877 of 1493
Page 878
Site Location Map
Page 878 of 1493
Page 879
Appendix B
NYSDEC Notice of Intent (NOI)
Page 879 of 1493
Page 880
012345674812 2 5 5840
74512871487 12424
!"#$%$&
'6(833812)*+,-../012345 53812
1 483
58682 7'454897:";<!"=#>?"@!AB
C452 4 8 24885 DEA;B?FA=#GA!HF";IJK!"#L
'6(8338121 MNOPQ&$&PRSGTU
'4463 G?B;
V15 2W64
868(8847
183465( 27 XY53Y18
[08 4Y 712345674812 748584782515 318883465( 27 3 834882 54[C[1 \
Z
[[08 27562151 4Y 384 245 3 ] 53734 7 33888 3 71(82 83 ] 5\
O!
[([34Y83 5 884812W51^74( 826812 628 5 1 W 54 24 WW515 8]15_W 28[[0`0aC4
`0`C4-1624570 26WC65 244 47[]84Y '0]Y87Y 434Y 36(342485
5b685 2431 \
O!
[7[34Y 712345674812 74858475 4841 3415] 458837Y 56 4Y 481 32145b685 W 584 3
8 3758( 882c0V`[d4 [6[212W182431657 65876465 15385876465 74858483\
O!
4Y 5'1' 5843
[08 4Y 8837Y 56 51 4Y 712345674812 7485847 4 7128848123 834882 54[C[1
\
Z
XY5 42 8 2828 26 58'W 783
Page 880 of 1493
Page 881
STU8JJ3V5 93L 384 3883MW 35384JJM4R595JM4QQ5 349W5 8593V43895R4X55R
3V54355RW543YTTSTZ
01
234357893 8 595438 327
[TY93V5 93L 384 3883MR598X435R\M3V5] II89985Q3V5^QQ85Q4_9`N5 5438
4R7893 8 595438^ N7 `WL9L433abc]NNdd[efTge [efTgS495h5IW3Q I3V5
27 585O955334 VI53eQ3V5i5335QN59 JL38\53O55bc2jH]4R^ N7 `R435R
k4L4Ma`elgmZ
01
1!1"#$
%1!&11'#"((1"#)*+1
,%"*11--*1*#(1()(1,',-1'10
1./'1-011+1
%!(&*),!('11!1&-11&'(-1)
,!('+!!+11,2)134#1((51/01+011"1
61))11-6-(7181")+19!-(*"1*1-1()(
1#:11'#'-,!('+!!+11,2$
;<<<<<<<<<=>31-(!,?@4-
;<<<<<<<<<3>@41-(!,?34-
;<<<<<<<<<@4A1-(!,?=44-B
C
[T4T8T7453V58IW4 393V893 8W W53859\5559 J5RZ
C
[T4T8TgTUV8VQ3V5QJJO8XR LI53438O8JJ\5I483485R433V5 93L 389835Z
,%D1!)11--1#1)*&.1=4E1-01011"1F-1
1)1!*12
j LI53438Q94389Q4 3 M IWJ84 5O83V25 38glnQ3V5b4384J7893 8 595438
3Q 4 35I8 L9W o5 3454p
01G--:010111*F--(
23435H8 I534JKL4J83MN585O2HKN
mTY93V5 93L 384 3883M9L\o5 332HKN43YTTmT` 3V55qL84J5358 I534J585O
Q I4 3V5bc2 Q5R54J4X5 M43YTTnTZ
C
mT4T7493V5O5rW543 \3485RR LI534383V433V5W o5 3585OWL9L4332HKN`
3V55qL84J53`V49\5594389Q85RW543YTTmT YTTnTQs tltemtllgZ
C
P8Q I 5RL59 3P 5I839
Page 881 of 1493
Page 882
_`+4/59 5965499a45-885)5++bc*D654+9d3X0(e94/55f\g854
994/5d395-58C5)b65*4Dh9i*1A1j[1AA@k3585)4ld5+l9c*D
654+e94/55f\g854e55f\5-94/+)9+4\)49)4g4b
012
3455638965
h+4/5)9+4\)49)4g4b4/4/545+/5-9+\)545+94/53445)8++5-+DD
9DD13-545-\48mC4/5349 4545)4g5B69d3X0(n+5a+45k
56549949
565495
1!"#$%&1$
' 56549(94)4*5+9949
,+4-.+45 */95 018
1! 234563758976 :;&1!<&=>112>>1;?$
@A 56549B8CD--5++
3# E>&=2&F
G?&EHIJ039372
K%L
@@+4/5a88C)94)4-55494/5 56549(94)4k
@jo/44b6599Cm49+4/59 596549k
MENE=
345949
@O*9P5)43455
Q=>R$!S1N1 T$1>
@U345D--5++
3976G?&EHIV E
#12>%11?J039779
W1
X0(Y5C9
Z
@[345.44\-5].9C4\-5
97;^332Z66J52^;248887^
*9P5)4X548+
Page 882 of 1493
Page 883
iV)%$'_j-$@<B%$$%"#%$0",`
023456782693426996436 7632334433 46375942237 4296 76
k;"'$&)'7,":'/&&A7'0+??@#9',V+<?'",V+<?'4"0X77'#9%=."01*23245233l-0+#A7",&%"#
"0&)'/"#$&,@/&%"#+/&%8%&A0+??$@#9',V+<?'46,'>+,9?'$$"0&)'$%m'"0&)'9%$&@,<+#/'6$'?'/&
nV+<?'4n
!"#$%$&'#&(%&)*+,&---./%"01*2324523367,"8%9'+/"#/%$'"8',8%'("0&)'7,":'/&
;'$/,%<''=%$&%#>+#97,"7"$'9/"#9%&%"#$6+#9%#/?@9'+#A"&)',,'?'8+#&%#0",B+&%"#
9543 4673C2694356234567826934367DEFGH8496I34DFJH8496463DFKH8496
7425663435I376363L84965M3456782693495323459563553296 7N94OI5637
67 4 O46I86996I9O694OI4452 94O9 7346559695287746 246234595694O
3O755I7854672376367 3659695KJL2759647 395687 423
73P9 6QEQ275596 547R3463MHDSF6333763 46
T467663673C2659627 OI627 O6395687I4686879 793857 D27 OF
96946956877 I73846364 7566463427
UV"&+?W%&'X,'+Y+/,'$Z
KK
43V"&+?X,'+&"<';%$&@,<'9Y+/,'$Z
QG
4[=%$&%#>-B7',8%"@$X,'+&"<';%$&@,<'9Y+/,'$Z
\\
44]@&@,'-B7',8%"@$X,'+^%&)%#;%$&@,<'9X,'+Y+/,'$Z
E\
_+&@,'"0&)'7,":'/&`
aM34567826934
4o;"A"@7?+#&"9%$&@,<B",'&)+#5+/,'$"0$"%?+&+#A"#'&%B'l
b5
347c3 7637856667d89746594 76TK379568794OO7 676 49275
643469
G492667246ODeF3 2f 733O92S39g738 DfSgF66596
XYhZ
\
.YhZ
\
!YhZ
\
Page 883 of 1493
Page 884
0234
566
789 9
0
6656
0
556
7!9" # $ #24$ $% 9
&'()*+,-
7B9C# $ # ; 7!D
.'()*+,/','0*)12304-,45(46+17+184('
7E9F $ #; 7! GHG24 %? I J0
@=KHK78KHHLD
96
7M9"N < I J>@=KHK78KHHLD
96
GH9< N$ % $ LHHN
D
96
GL90 ? $ # ?2% O$O
O O 4D
96
G79< % # # PQI%
RS T$D
96
GG9" #$ # #O % #O % ?
% ? D
96
: ;<===>?
@ <===: ;?
GU9F<=== ? $ ;? ="""9@=KHK78KHHLD
A'-
G890 <=== ? #S ? %
>::IO!PQ>::=UMHO % ="""9I979@=KHK78K
HHLD
A'-
G!9F ; ? > ? <===
? $ PQ ? >
2SV VS4D
A'-
Page 884 of 1493
Page 885
K_` %#$ !%#>9!&%#Z9#1!&%#! ' # & 0 &# 9#19 9! !& &#!"#$ 67888a &
( b ?! (1&9!&"! &9 '1#$#$ c66#! ' # d & 0 &#S %10&d &Z ?e
012
K_7$19$b %1!&!"#$ c66#! ' # d & 0 &#S %10&d &Z ?' %Z% (#!( b ?! #$
67888e
3435
678888
Kfg$ 6#! ' # 8!??Z#1!&8 b !&8?&h67888i' % (ajk
12211
!"#$ %!&'$! (#$ 67888
)*+,-1
.678888 / 0 &12#1!&
345-612
7678888 8!	#:&"! #1!&
;1%# &(< %# 8$!& => 1?
)*+,-1 @ABCD53CEABF G-1HI4J--12I4
K678888 L(( %%
D4M3*,NJOMP*1A44
QPOR0A534E
S!'&?! (678888 8 #1"19 #1!&;!
121*T1*+1J2*1G2*G1G1-PG-,PG1G1I1*I*4U
A3IT*+1TV1J*-J-VTI1*I*4
3W+1I1*1-M5G1G12+P-2*+24
EXG-*+1I4G1*1-4
6J-M51G131*I*Y4
8? % Z ?! (#$ 678888 8 #1"19 #1!&
2JGGI1*421-G-C4F[3B[343BA3UF4\
8! &#
` %#$ 678888 8 #1"19 #1!&;! a &%10& (aj#$ 67888 1&
99!( &9 '1#$8 #l::m!"n8>>7o>.e
012
=!%1!&]6 (1 !&#!?8 1# 1
o` % 9!&%#Z9#1!&% pZ &9 %9$ (Z? "! #$ ?&& ( & 0 &# 9#19 %a & (e
012
8!%#>8!&%#Z9#1!&8 1# 1
61# 8?&&1&0 &(6!1?^ %#! #1!&
Page 885 of 1493
Page 886
4c6-d?+9*1C2-)00-O1*+-F0)9919:-F,)A*1A+O-*P)*-e+,+-/O+?-*<-F,+F),+-*P+-C19)0-O1*+-F0)9f0)2</*-C<,-*P+
F,<Q+A*6
0123214567898 9 73612 125
0123214567898 213
2 67898 2517959 15 79
4g6-d9?1A)*+-eP1AP-<C-*P+-C<00<e19:-O<10-,+O*<,)*1<9-A,1*+,1)-e)O-/O+?-*<-)??,+OO-*P+-,+>/1,+H+9*O-19
7+A*1<9-W6R6c-@h7<10-E+O*<,)*1<9hD-<C-*P+-^+O1:9-G)9/)06
73612 51253721236812 7958159276628723681567891271229637952 8 62
!2379"595#322$52%&&'
()*+,-./)01*2-3,1*+,1)
456-()*+,-./)01*2-71819:-3,1*+,1)
;<*)0-(.= ;<*)0-EE= ;<*)0-(.= 7/H-<C-EE=-)9?
,+>/1,+?-@)A,+B F,<=1?+?-@)A,+B G1@91 H/H-EE= F,<=
)A,+BC++*D 1?+?-@)A,+B (.=-F,<=1?+?
C++*D C++*D C++*D
I&JK ILIL IIJM ILJK I&JM
456)6-NO+-*P1O-OF)A+-*<-O/HH),18+-*P+-OF+A1C1A-O1*+-01H1*)*1<9O-)9?-Q/O*1C1A)*1<9-C<,-9<*-,+?/A19:
RSST-<C-(.=-,+>/1,+?6
76277656789379 238737638797615678915623#U$2!'
()*+,-./)9*1*2-3,1*+,1)
WR6-^<+O-<9+-<C-*P+-e)1=+,-A<9?1*1<9O-)FF02-*<-*P+-AP)99+0-F,<*+A*1<9-C<,-*P1O-A<9O*,/A*1<9
)A*1=1*2i
V8
WR6X616-3Y=-E+>/1,+?-@)A,+BC++*D
IL&&
WR6X6116-3Y=-Y,<=1?+?-@)A,+BC++*D
IL&&
W]6-^<+O-<9+-<C-*P+-e)1=+,-A<9?1*1<9O-)FF02-*<-*P+-.F-)9?-.C-C<,-*P1O-A<9O*,/A*1<9-)A*1=1*2i
V8
Z=+,X)9[-\0<<?-3<9*,<0-3,1*+,1)[email protected]
W]6X616-Y,+B^+=+0<FH+9*-@3\7D
_LM
W]6X6116-Y<O*B^+=+0<FH+9*-@3\7D
`J
;<*)0-ab*,+H+-\0<<?-3<9*,<0-3,1*+,1)[email protected]
W]6X61116-Y,+B^+=+0<FH+9*-@3\7D
L_`M
W]6X61=6-Y<O*B^+=+0<FH+9*-@3\7D
`M
ZF+,)*1<9-)9?-G)19*+9)9A+
Page 886 of 1493
Page 887
345V66 6 6 96 6 &6 ( J6
6 6 6 01 9 . 9W
012
3456589 6 6 96 6 5
!"#$$1%
&' ( )&89 6
3*5&' ( ++, -( 6 9)6 969)&
++, -( 6 9 ' ( 8 .(/6 ,6' ( /6
)& 061 061
2$334!"4131!34!"52678 9:;
335/ 6 . )&
, 6 (6( <6 ' ( 8 .(
/ 6 . )& / 6 . )& / 6 . )& /6061
&
3R589 XY 6 9 JX66-(9Z[65
=4!1
3\58<866 J [ 6 &685]5W
=4
)*)>&&&/ 6
3^5> ( 6 . J ( 6( 960 1,69 6_6 9U
' )* 6016 996 )*01W
012
3^565>-(9 &685I5̀555W
?@A"@BCCC"DEE1F3!E1"24G
)*)>&&&/ 6 HIJ 69
K4L!$4 M"3N1"?@A"@BCCC"DEE1F3!E1"24G"O4G"3N1"$!P"Q1$4L:"
?@A"@BCCC"DEE1F3!E1"24G
RS5)*/ 6 <T(9 HU69
'
RS565V6 9 6Y ( . 6 a 96b
9(6(c9 6 . 6 b 696 J &6d885T56 9( 96
J <8W
=4
Page 887 of 1493
Page 888
011345677896 6879 7 45 5 55943
! "
#$%&'(#)&'*+,'-.&'+/0/1*+/,%
#$%&'(#)&'*+,'-.&'+/0/1*+/,%-2,'3-4,$%5,*6
414 57 5458 53494569:1; 1;9 14
57 5458 5349456
<=>-?)5,*6-#$%&'(#)&'*+,'-.&'+/0/1*+/,%-2,'3
.,33&%+
<=>*>-O*J-+G&-#$%&'(#)&'*+,'-.&'+/0/1*+/,%-2,'3-0',3-@))&%6/H-P-I&&%-J/Q%&6-IF-+G&
,$%&'(,)&'*+,'R-,'-*-'&)'&J&%+*+/S&-,0-+G&-,$%&'(,)&'*+,'-/%-*11,'6*%1&-$/+G-A*'+-TCC>P-,0-UAVWVDXV
WW=-*%6-Y)5,*6&6-+,-+G&-&K#CZ
4
011345677896 6879 7 45 5 55943
! "
@66/+/,%*5-A',B&1+-C%0,'3*+/,%
<D>-E%+&'-*%F-*66/+/,%*5-)&'+/%&%+-)',B&1+-/%0,'3*+/,%-/%-+G&-+&H+-I,H-I&5,$>
@++*1G3&%+J
4*+& @++*1G3&%+-K*3& .,%+&H+ ?J&'
!7L7 L"M! N 7534567 3 0 6 04: 413
Page 888 of 1493
Page 889
Appendix C
MS4 SWPPP Acceptance Form
Page 889 of 1493
Page 890
MS4 SWPPP Acceptance Form
for construction activities seeking authorization under the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI
and submitted to NYSDEC electronically.)
I. Project Owner/Operator Information
1. Owner/Operator Name: Brian Hillery & William Sahlem
2. Contact Person: Brian Hillery
3. Street Address: 1 Woodthrush Trail
4. City/State/Zip: Orchard Park, NY 14127
II. Project Site Information
5. Project/Site Name: Multifamily Development
6. Street Address: 1425 & 1475 Orchard Park Road
7. City/State/Zip: West Seneca, NY 14224
III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance Information
8. SWPPP Reviewed by:
9. Title/Position:
10. Date Final SWPPP Reviewed and Accepted:
IV. Regulated MS4 Information
11. Name of MS4 Operator:
12. MS4 SPDES Permit Identification Number: NYR20A
13. Street Address:
14. City/State/Zip:
15. Telephone Number:
Page 1 of 2
Page 890 of 1493
Page 891
MS4 SWPPP Acceptance Form - continued
V. Certification Statement - MS4 Official (principal executive officer or ranking elected official) or
Duly Authorized Representative
I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project
identified in section II. of this form has been reviewed and meets the substantive requirements in the
SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP).
Note: The MS4 Operator, through the acceptance of the SWPPP, assumes no responsibility for the
accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of
the SWPPP by the MS4 Operator does not relieve the owner/operator or their SWPPP preparer of
responsibility or liability for errors or omissions in the plan.
Printed Name1:
Title/Position:
Signature:
Date:
VI. Additional Information
1 Printed name of the principal executive officer or ranking elected official for the MS4 Operator or their
duly authorized representative in accordance with CGP Part VII.J.2.
(NYSDEC - MS4 SWPPP Acceptance Form - January 2025)
Page 2 of 2
Page 891 of 1493
Page 892
Appendix D
Engineer’s Report
Page 892 of 1493
Page 893
ENGINEER’S REPORT
for
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, Erie County, New York
Prepared for
Brian Hillery & William Sahlem
1 Woodthrush Trail
Orchard Park, NY 14127
Prepared by
Carmina Wood Design
80 Silo City Row, Suite 100
Buffalo, NY 14203
Telephone: (716) 842-3165
Fax: (716) 842-0263
May 2026
Page 893 of 1493
Page 894
Table of Contents
Written Engineer’s Report
Section 1 – Location & Description Page 1
Section 2 – Water Service Page 1
Section 3 – Sanitary Sewer Service Page 1
Section 4 – Storm Sewer Service Page 2
Section 5 – Erosion Control Summary Page 3
Section 6 – Geotechnical Items Page 4
Appendices
Appendix A Site Location Map
Appendix B Sanitary Sewer & Water Demand Calculations
Appendix C Downstream Sewer Capacity Analysis Report
Appendix D Storm Water Calculations
Appendix E Soil Information
Page 894 of 1493
Page 895
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 1 of 4
5/26/2026
Section 1 – Location & Description
This new development project involves the construction of three (3) 4-unit, one (1) 5-unit and two (2) 6-
unit ranch style townhomes, for a total of 29 units. Construction will also consist of associated parking,
storm water management, utility, lighting, and landscaping improvements. The site is currently vacant
consisting of grass, brush and tree cover. The total area of the site is 16.59 acres with an area of
disturbance of approximately 7.37 acres. The site has been rezoned to C-1(S) to allow for the development.
See Appendix A for Site Location Map.
Section 2 – Water System
The proposed 6” combined water service will connect to an existing 8” PVC water main located on the west
side of Orchard Park Road. The proposed service will tap the main and enter a heated enclosure where an
RPZ and meter will be provided. The combined service will enter the buildings and reduce to a 2” domestic
service. Two (2) private fire hydrants are proposed to provide fire protection. Drainage from the hotbox
due to testing or failure will be via gravity to the nearest drainage inlet. Water inside the building will be
used for typical bathroom and janitorial uses.
Domestic Summary:
Peak Operating Demand: 87 gpm
Water Main: 8” PVC water main along Orchard Park Road
Static Pressure: 70 psi
Friction Loss: 0.2 psi
Elevation Loss: -2.0 psi
Meter & RPZ Loss: 13 psi
Pressure at furthest unit: 58.8 psi
Fire Summary:
Peak Operating Demand: 1,000 gpm
Water Main: 8” PVC water main along Orchard Park Road
Static Pressure: 70 psi
Friction Loss: 12.6 psi
Elevation Loss: -2.0 psi
Meter & RPZ Loss: 13 psi
Pressure at furthest hydrant: 46.4 psi
Repairs to all devices will be made during off hours; dual backflow preventers are not required. The site is
not located in a 100-year flood plain.
Disinfection of the water service following installation will be continuous feed, according to AWWA C-651,
latest revision.
See Appendix B for Sanitary Sewer & Water Calculations.
Section 3 – Sanitary Sewer Service
The proposed sanitary sewer service will connect to an existing manhole located along the west side of
Orchard Park Road. The proposed service will consist of approximately 691 LF of 8” SDR-35 PVC private
sanitary sewer main at a slope of 0.4%, 346 LF of 6” SDR-35 PVC sanitary sewer lateral at a minimum slope
of 1.0% and 285 LF of 3” SDR-21 PVC force main with a minimum cover of 4’.
Page 895 of 1493
Page 896
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 2 of 4
5/26/2026
Design Parameters:
Multifamily Development: 29 units x 220 gpd/unit = 6,380 gpd
Since the sanitary sewer extension is designed to convey greater than 2,500 gpd, a downstream sewer
capacity analysis was performed to ensure that the existing sewer could handle the additional flow.
The hydraulic loading rates per “Design Standard for Wastewater Treatment Works” 2014, NYSDEC.
See Appendix B for Sanitary Sewer & Water Calculations
See Appendix C for Downstream Sewer Capacity Analysis Report
Section 4 – Storm Sewer Service
The existing site sheet drains from east to west to a USACE jurisdictional wetland area at the rear of the
site.
The proposed development will replicate the existing hydrology of the site. The proposed hydrology for the
development project area will consist of overland sheet flow and pipe channel flow. The storm sewer
system for this site will consist of 6”, 8” and 12” HDPE pipes connected by a series of catch basins and yard
drains. Stormwater runoff generated from the site will enter the pipe network and be conveyed to a
detention basin on the west side of the site. The detention basin will discharge runoff, at a controlled rate,
to the existing wetlands. To meet NYSDEC water quality requirements, runoff will be conveyed to a
bioretention areas prior to the detention basin. Runoff that is currently being discharged on to the site
from the church parking lot to the east will be collected and piped to the west side of the site.
Design Criteria
Storm pipes: 10-year storm
Detention: Comparison of the existing 1-year vs. the proposed 1-year runoff.
Comparison of the existing 10-year vs. the proposed 10-year runoff.
Comparison of the existing 10-year vs. the proposed 25-year runoff.
Comparison of the existing 100-year vs. the proposed 100-year runoff.
Stormwater Runoff Summary:
To Detention:
Event Prop. Runoff (cfs) Elevation (ft) Storage (cf)
1-yr 1.94 671.04 5,335
10-yr 2.82 672.95 15,013
25-yr 3.10 673.70 21,268
100-yr 3.45 674.73 34,966
Direct:
Event Prop. Runoff (cfs)
1-yr 0.38
10-yr 1.12
25-yr 1.57
100-yr 2.52
Total Site:
Event Ex. Runoff (cfs) Prop. Runoff (cfs)
1-yr 2.63 2.32
10-yr 8.17 3.94
25-yr 11.66 4.67
100-yr 18.97 5.97
Page 896 of 1493
Page 897
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 3 of 4
5/26/2026
See Appendix D for Storm Water Calculations
Section 5 – Erosion Control Summary
Stabilization Practices
Stabilization practices for this site include:
A. Land clearing activities shall be done only in areas where earthwork will be performed and shall
progress as earthwork is needed.
B. Use of stabilization fabric for all slopes having a slope greater than 1V:3H.
C. Permanent seeding and planting of all unpaved areas using the hydromulching grass seeding
technique.
D. Mulching exposed areas.
E. Frequent watering to minimize wind erosion during construction.
Structural Practices
Structural practices for this site include:
A. Inlet protection using a method detailed in the Construction Documents
B. Perimeter protection using temporary silt fence
C. Temporary stone wash off areas
Sequence of Major Activities
The Contractor will be responsible for implementing the following erosion control and storm water
management control measures. The Contractor may designate these tasks to certain subcontractors as he
sees fit, but the ultimate responsibility for implementing these controls and ensuring their proper
functioning remains with the Contractor. The order of activities will be as follows:
A. Construct temporary construction exit at location shown on the Demo & Erosion Control Plan Sheet.
B. Install perimeter silt fences in the locations shown on the Demo & Erosion Control Plan sheet.
C. Clear and grub site within disturbance (silt fence) limits.
D. Installation of detention basin to act as sediment basin (do not install bioretention soil or underdrains
until stabilized)
E. Commence site grading.
F. Disturbed areas of the site where construction activity has ceased for more than 14 days shall be
temporarily seeded and watered.
G. Construction of buildings.
H. Installation of proposed utilities.
I. Finalize pavement subgrade preparation.
J. Construct all curb, drainage inlets, storm sewer pipes and storm sewer manholes, as shown on the
plans. Install temporary inlet protection at the locations of all new inlets.
K. Dust control.
L. Remove inlet protection around inlets and manholes no more than 48 hours prior to placing stabilized
base course.
M. Install base material as required for pavement.
N. Carry out final grading and seeding and planting.
O. Clean storm system following construction.
P. Remove silt fencing only after all paving is complete and exposed surfaces are stabilized.
Page 897 of 1493
Page 898
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 4 of 4
5/26/2026
Section 6 – Geotechnical Items
According to the USDA Web Soil Survey, the onsite soil is made up of Darien silt loam, Niagara silt loam and
Remsen silty clay loam. These soils are categorized under hydrologic soil groups C/D and D and will have a
slow infiltration rate when thoroughly wet.
See Appendix D for Soil Information.
Page 898 of 1493
Page 899
Appendix A
Site Location Map
Page 899 of 1493
Page 900
Site Location Map
Page 900 of 1493
Page 901
Appendix B
Sanitary Sewer & Water Demand Calculations
Page 901 of 1493
Page 902
CARMINA WOOD DESIGN Project No.: 23-4121 Date: 5/22/2026
80 Silo City Row, Suite 100 Project Name: Multifamily Development
Buffalo, New York 14203 Project Address: 1425-1475 Orchard Park Road - West Seneca
(716) 842-3165 Subject: Sanitary Sewer Demand Calcs
FAX (716) 842-0263 Sheet: 1 of 1
Sanitary Sewage Demand Calculations:
Proposed Townhomes
220 gal/d/unit x 29 units = 6,380 gpd *use 220 gallons per unit per day (2-bdrm)
Find Peak Sanitary Demand:
Peaking Factor based on Population:
Total demand: 6,380 gpd / 51.96 gpcd = 123 per capita
Population (P) = 123 people
Peaking Factor : (18 +√P) / (4 + √P ) where P is in thousands
Peaking Factor = 4.22
Peak Sanitary Demand = 6,380 x 4.22 = 26,911 gpd
= 0.027 MGD
= 0.042 cfs
Required Infiltration and Inflow Mitigation:
Mitigation Fee = $2.40 /gal = $15,312.00
Page 902 of 1493
Page 903
Carmina Wood Design Project No.: 23-4121 Date: 5/18/2026
80 Silo City Row, Suite 100 Project Name: Multifamily Development
Buffalo, NY 14203 Project Address: 1475 Orchard Park Road - Town of West Seneca
(716) 842-3165 Subject: Sanitary Sewage Pump Station Design
FAX (716) 842-0263 Sheet: 1 of 1
Sanitary Sewage Demand Calculations:
Proposed Apartments
220 gpd/unit x 25 units = 5,500 gpd
Average Site Sanitary Flow: = 5,500 gpd
Peak Site Sanitary Flow: = 22,000 gpd
PF = 4.0
* assume flow over 18 hour period
Peak Site Sanitary Flow: = 20.4 gpm
8" inlet into pump station invert: 670.68
Forcemain invert at tie into downstream sewer: 676.55
Pump chamber diameter: 5 ft ( 147 gal/ft)
Storge required:
* use filling time of 30 minutes @ 20.4 gpm (peak flow)
Storage required = 20.4 gpm x 30 mins = 4.16 ft
147 gal
Top of pump station: 682.40
Inlet & Alarm: 670.68
2 pumps on: 670.18 (inlet minus 0.5 ft)
1 pump on: 669.68 (2 pumps on minus 0.5 ft)
pumps off: 665.52 (1 pump on minus storage required)
Bottom of station: 664.27 (pumps off minus 1.15 ft)
Total depth: 18.13 ft
Cleansing velocity:
Using a 3 inch forcemain, find flow for min 2 fps cleansing velocity
A= 0.05 ft2
2
Q=VxA= 2 fps x 0.05 ft = 0.09817 cfs = 44.1 gpm
Page 903 of 1493
Page 904
CARMINA WOOD DESIGN Project No.: 23-4121 Date: 5/22/2026
80 Silo City Row, Suite 100 Project Name: Multifamily Development
Buffalo, New York 14203 Project Address: 1425-1475 Orchard Park Road - West Seneca
(716) 842-3165 Subject: Water Demand Calcs
FAX (716) 842-0263 Sheet: 1 of 1
Water Demand Calculations (domestic):
Townhome Development:
Q = 3 gpm/unit x 29 units = 87 gpm ECDOH Requirement
Water Demand Calculations (fire):
Q= 1500 gpm * per ISO Guidelines
Elev. at ex. residual hydrant = 684.5 ft
Static pressure at ex. hydrant = 70 psi
El. @ road tap = 684.5 ft
Δ elev ex. hydrant to road tap = 0 ft = 0.0 psi (positive is decrease in pressure from static)
(negative is increase in pressure from static)
Static pressure at road tap = 70.0 psi
El. @ furthest building = 679.9 ft
Δ elev road tap to furthest building = -4.6 ft = -2.0 psi (positive is decrease in pressure from static)
(negative is increase in pressure from static)
Find residual at furthest unit using domestic flow:
Headlosses:
Qpeak = 87.0 gpm
Pipe = 6 inch PVC C = 150
Length = 646 LF (approx. distance from tap to furthest building)
10.44 L Q1.85 10.44(646)(87)1.85
HL = 1.85 4.866 = = 0.40 ft = 0.2 psi
C D (150)1.85 (6)4.866
Loss through 6-inch RPZ & meter = 13 psi
Residual pressure at furthest unit = Static pressure at road tap - headlosses - Δ elev
=70.0 - 0.2 - 13 - (-2)
= 58.8 psi
Find residual at furthest hydrant using fire flow:
Headlosses:
Qpeak = 1000 gpm
Pipe = 6 inch PVC C = 150
Length = 509 LF (approx. distance from tap to furthest hydrant)
10.44 L Q1.85 10.44(509)(1000)
1.85
HL = 1.85 4.866 = 1.85 4.866 = 29.05 ft = 12.6 psi
C D (150) (6)
Loss through 6-inch RPZ = 13 psi
Residual pressure at furthest unit = Static pressure at road tap - headloss - Δ elev
= 70.0 - 12.6 - 13 - (-2)
= 46.4 psi
Page 904 of 1493
Page 905
Appendix C
Downstream Sewer Capacity Analysis Report
Page 905 of 1493
Page 906
TOWN OF WEST SENECA
TOWN SUPERVISOR
GARY A. DICKSON
TOWN COUNCIL
JEFF PIEKAREC
ENGINEERING DEPARTMENT SCOTT ROBERTSON
ROBERT BREIDENSTEIN
MARY SHERMAN
1/6/2026
Jeffrey Scheiber
Code Enforcement Officer
Town of West Seneca
Re: Proposed Townhouses (1425 Orchard Park Road)
Sanitary Sewer Capacity Analysis (Revised December 2025)
Dear Mr. Schieber,
In January 2025, the Town Board approved the discharge of sanitary sewage flow from the proposed
developments at 1425 Orchard Park Road and 1130 Orchard Park Road into the Town’s existing 10” sewer
main located along Orchard Park Road which is part of the Town’s Sewer District 13.
At that time, the proposed average daily flow from 1425 Orchard Park Road development was calculated to
be 7,040 gallons per day. This volume was based on a total of (32) 2-bedroom apartments, assuming 110
gallons per day per bedroom.
PROPOSED CHANGES:
The developer is now proposing to construct twenty-nine (29) 2-bedroom townhouses instead of the
apartment units, which has reduced the proposed sewage flow from 7,040 gallons per day to 6,380 gallons
per day, assuming 110 gallons per day per bedroom.
CONCLUSION:
Since the proposed sewer flow for the twenty nine, 2 bedroom townhouses is less than the previously
approved apartments, I have no additional concerns with the capacity of the sewer.
SEWER MITIGATION FEE
Please note in July 2024 the Town increased the cost per gallon for the sewer mitigation fee from
$1.20/gallon to $2.40/gallon. The original application was submitted prior to that date but the revised
project for 1425 Orchard Park Road was submitted after the fee changed, so I am proposing to utilize the
new fee to calculate the total amount for the revised project as follows:
TOWN HALL 1250 UNION ROAD· WEST SENECA. NEW YORK 14224 • (716) 558-3220 • FAX (716) 677-5448
www.westseneca.net
Page 906 of 1493
Page 907
1425 Orchard Park Road:
6,380 GPD (increase of average daily flow)
x $2.40 ($/gallon)
$15,312
A sewer mitigation fee, as calculated above, should be collected by your office and applied toward the sewer
repair fund for Sewer District 13.
Very truly yours,
Jason A. Foote, P.E.
Town Engineer
cc: Files:
Chris Trapp, Town Attorney
Supervisor Dickson and Town Board Members
TOWN HALL 1250 UNION ROAD· WEST SENECA. NEW YORK 14224 • (716) 558-3220 • FAX (716) 677-5448
www.westseneca.net
Page 907 of 1493
Page 908
DOWNSTREAM SANITARY SEWER CAPACITY
ANALYSIS REPORT
for
Proposed Apartments
1425 Orchard Park Road
Town of West Seneca, Erie, NY
Prepared for
William Sahlem and Brian Hillery
1 Woodthrush Trail,
Orchard Park, NY 14127
Prepared by
Carmina Wood Design
487 Main Street, Suite 500
Buffalo, NY 14203
Telephone: (716) 842-3165
Fax: (716) 842-0263
December 2023
Page 908 of 1493
Page 909
Project Description
This project is a development of a 3.17 acre +/- site located on the west side of Orchard Park Road in the Town of
West Seneca. The property will be developed with (26) 2-bedroom apartment units and (4) 3-bedroom apartment
units. This analysis will also include the recently approved multi-family project at 1130 Orchard Park Road (45 2-
bedroom units).
The proposed sewer service for this development will connect to an existing 10” Town of West Seneca sewer main
the runs along the west side of Orchard Park Road.
Node 1 – 1001 Orchard Park Rd (12”):
Existing Peak Flow measured (wet weather event) = 2.844 cfs (1.838 mgd)*
Proposed Apartments Peak Flow (Flattery’s) = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road) = 0.046 cfs**
Proposed Total Peak Flow = 2.955 cfs
Theoretical capacity of existing 12” pipe @ 0.36% = 2.314 cfs
Conclusion: Monitored flows the day following the 0.72” rainfall event exceeded the capacity of the existing pipe
12” sewer. One time during the monitoring period the flow depth exceeded the pipe diameter at Node 1, but at
no time during the monitoring period did the flow at any point slow or stall which would have caused a backup or
flooding at the manhole. The 12” sewer receives surcharges from a 27” sewer and 36” sewer downstream during
high rainfall events. Outside of these events, the 12” sewer has ample capacity to handle the additional proposed
total peak flow. I/I mitigation shall be required for the contribution proposed for this project.
Node 2 – Orchard Park Rd (15”):
Existing Peak Flow measured (wet weather event) = 2.917 cfs (1.885 mgd)*
Proposed Apartments Peak Flow (Flattery’s) = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road) = 0.046 cfs**
Proposed Total Peak Flow = 3.028 cfs
Theoretical capacity of existing 15” pipe @ 0.34% = 4.077 cfs
Conclusion: The proposed total peak flow is less than the capacity of the 15” pipe, therefore there is sufficient
capacity. One time during the monitoring period the flow depth exceeded the pipe diameter at Node 2, but at no
time during the monitoring period did the flow at any point slow or stall which would have caused a backup or
flooding at the manhole. The 15” sewer receives surcharges from a 27” sewer and 36” sewer downstream during
high rainfall events. Outside of these events, the 15” sewer has ample capacity to handle the additional proposed
total peak flow. I/I mitigation shall be required for the contribution proposed for this project.
Proposed Apartments
10/3/2022
Page 1 of 2
Page 909 of 1493
Page 910
Node 3 – Orchard Park Rd & Fairfax (48”):
Existing Peak Flow measured (wet weather event) = 14.470 cfs (9.352 mgd)*
Proposed Apartments Peak Flow (Flattery’s) = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road) = 0.046 cfs**
Proposed Total Peak Flow = 14.581 cfs
Existing Peak Flow measured (overall) = 16.150 cfs (10.438 mgd)*
Proposed Apartments Peak Flow (Flattery’s) = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road) = 0.046 cfs**
Proposed Total Peak Flow = 16.261 cfs
Theoretical capacity of existing 48” pipe @ 0.15% = 60.218 cfs
Conclusion: The proposed total peak flow is less than the capacity of the 48” pipe, therefore there is sufficient
capacity. At no time during the monitoring period did flow depth exceed the pipe diameter at Node 3 of the
downstream monitoring points during the rain events monitored.
Foot Notes:
Downstream capacity node information provided by Town of West Seneca
*Converted from measurements in TECSmith report dated 9/15/22 & 4/19/22
** See Sanitary Sewage Demand Calculations
Proposed Apartments
10/3/2022
Page 2 of 2
Page 910 of 1493
Page 911
Location Map
Page 911 of 1493
Page 912
Page 912 of 1493
Page 913
Sanitary Demand Calculations
Page 913 of 1493
Page 914
CARMINA WOOD DESIGN Project No.: 23-4121 Date: 12/11/2023
487 MAIN STREET, SUITE 500 Project Name: Proposed Apartment Development
BUFFALO, NEW YORK, 14203 Project Address: 1425 Orchard Park Road
(716) 842-3165 Subject: I & I Mitigation
FAX (716) 842-0263 Sheet: 1 of 1
Sanitary Sewage Demand Calculations:
Proposed Development
220 gal/d/unit x 26 units = 5,720 gpd *use 220 gal/d/unit (2-bdrm apt)
330 gal/d/unit x 4 units = 1,320 gpd *use 330 gal/d/unit (3-bdrm apt)
Total Site Sanitary Demand: = 7,040 gpd
Find Peak Sanitary Demand:
Peaking Factor based on Population:
Total demand: 7,040 gpd / 52 gpcd = 135 per capita
Population (P) = 135 people
Peaking Factor : (18 +√P) / (4 + √P ) where P is in thousands
Peaking Factor = 4.21
Peak Sanitary Demand = 7,040 x 4.21 = 29,604 gpd
= 0.030 MGD
= 0.046 cfs
Required Infiltration and Inflow Mitigation:
Total Sanitary Flow = 7,040 gpd
Mitigation Credit = $1.20 / gpm (Town of West Seneca)
Mitigation Agreement Amount = $8,448.00
Page 914 of 1493
Page 915
CARMINA WOOD DESIGN Project No.: 22.128 Date: 10/3/2022
487 MAIN STREET, SUITE 500 Project Name: Residential Apartments
BUFFALO, NEW YORK, 14203 Project Address: 1130 Orchard Park Road West Seneca, NY
(716) 842-3165 Subject: Sanitary Sewer Demand Calcs
FAX (716) 842-0263 Sheet: 1 of 1
Sanitary Sewage Demand Calculations:
Proposed Apartments
220 gal/d/unit x 45 units = 9,900 gpd *use 220 gallons per unit per day (2-bdrm)
Total Site Sanitary Demand: = 9,900 gpd
Find Peak Sanitary Demand:
Peaking Factor based on Population:
Total demand: 9,900 gpd / 100 gpcd = 99 per capita
Population (P) = 99 people
Peaking Factor : (18 +ÖP) / (4 + ÖP ) where P is in thousands
Peaking Factor = 4.24
Peak Sanitary Demand = 9,900 x 4.24 = 42,023 gpd
= 0.042 MGD
= 0.065 cfs
Required Infiltration and Inflow Mitigation:
Peak Sanitary Flow = 42,023 gpd = 29.18 gpm
4:1 offset flow per NYSDEC requirements = 29.18 x 4 = 116.73 gpm req'd
Mitigation Credit = 30 gpm / lateral
Laterals to be replaced* = 3.9 laterals
= 4 laterals *(or other mitigation as identified by the Town)
From DSCA for Multi-family project
at 1130 Orchard Park Road
Page 915 of 1493
Page 916
TECSmith Monitoring Report
Page 916 of 1493
Page 917
Date Node 1 Node 2 Rain 2 Date Node 3 Rain 2 Snow
1001 Orchard Park Rd (12") Orchard Park Rd 15" (15") Orchard Park Rd & Fairfax (48")
FLOW PEAK FLOW PEAK FLOW PEAK FLOW PEAK (inches) FLOW PEAK FLOW PEAK (inches) (inches)
(GAL x 1,000) (MGD) LEVEL (IN) (GAL x 1,000) (MDG) LEVEL (IN) (GAL x 1,000) (MDG) LEVEL (IN)
8/16/2022 89.257 0.440 5.964 168.586 0.721 4.437 0.23 3/17/2022 3196.614 6.783 13.938 0 0
8/17/2022 215.037 0.376 4.744 438.779 0.622 3.770 0 3/18/2022 5684.090 6.485 13.639 0 0
8/18/2022 189.150 0.370 4.686 427.549 0.628 3.826 0 3/19/2022 6314.024 7.874 17.857 0.27 0
8/19/2022 185.188 0.342 4.512 414.203 0.666 4.069 0 3/20/2022 7506.892 9.168 20.985 0.08 0
8/20/2022 202.299 0.331 4.923 396.354 0.689 4.133 0 3/21/2022 6601.632 8.220 19.365 0 0
8/21/2022 242.472 0.443 5.850 452.414 0.758 4.278 0.11 3/22/2022 5911.885 6.708 14.066 0 0
8/22/2022 211.005 0.478 4.897 492.229 0.645 3.891 0.14 3/23/2022 6366.253 9.352 21.857 0.51 0
8/23/2022 205.428 0.447 4.517 162.364 0.422 3.395 0.05 3/24/2022 8410.107 10.438 23.577 0 0
8/24/2022 203.451 0.394 4.725 253.953 0.604 4.307 0.45 3/25/2022 7059.230 8.020 19.386 0 0
8/25/2022 181.878 0.416 4.675 439.324 0.669 4.150 0 3/26/2022 7112.401 8.489 19.148 0.09 0.1
8/26/2022 190.142 0.419 4.851 414.269 0.625 3.883 0 3/27/2022 7001.414 8.461 18.753 0.06 2.3
8/27/2022 177.502 0.405 4.759 424.759 0.670 4.011 0 3/28/2022 6396.917 7.538 17.111 0.01 0.4
8/28/2022 149.262 0.306 4.729 402.881 0.700 4.187 0 3/29/2022 5909.058 6.957 14.053 0 0
8/29/2022 131.545 0.272 4.563 409.867 0.776 4.384 0 3/30/2022 5521.696 6.653 13.811 0.01 0
8/30/2022 277.592 0.705 7.523 530.810 1.126 5.440 0.97 3/31/2022 5943.213 7.661 16.548 0.09 0
8/31/2022 207.872 0.351 5.185 507.470 0.687 4.085 0 4/1/2022 5419.635 6.277 14.053 0.06 0.1
9/1/2022 185.028 0.361 5.419 434.561 0.610 3.756 0 4/2/2022 5147.186 6.140 13.371 0 0
9/2/2022 157.770 0.346 4.843 411.119 0.619 3.892 0 4/3/2022 5083.174 6.186 13.093 0.01 0
9/3/2022 147.788 0.355 5.089 391.309 0.645 4.003 0 4/4/2022 4946.766 6.325 12.723 0 0
9/4/2022 166.764 0.303 4.897 378.377 0.635 3.860 0.04 4/5/2022 4901.882 5.708 12.382 0 0
9/5/2022 464.216 1.838 32.342 716.100 1.885 64.943 0.72 4/6/2022 4842.495 5.943 12.848 0.21 0
9/6/2022 241.691 0.307 5.076 505.569 0.654 4.013 0 4/7/2022 7751.294 9.369 21.493 0.25 0
9/7/2022 190.037 0.354 5.440 449.703 0.749 4.317 0.01 4/8/2022 7000.725 8.355 18.804 0 0
9/8/2022 182.211 0.372 4.852 443.591 0.642 3.912 0 4/9/2022 6041.826 7.017 13.864 0 0
9/9/2022 180.567 0.332 5.309 426.468 0.702 4.143 0 4/10/2022 5473.970 6.521 13.216 0 0
9/10/2022 169.443 0.373 5.192 428.528 0.686 4.058 0 4/11/2022 5257.193 7.976 15.138 0.13 0
9/11/2022 98.925 0.532 6.704 397.027 0.919 4.930 0.03 4/12/2022 7299.038 9.109 16.993 0.14 0
9/12/2022 336.528 0.958 8.256 552.252 1.290 5.735 0.28 4/13/2022 6134.522 7.267 14.479 0.05 0
9/13/2022 356.909 0.736 6.372 589.969 0.876 4.687 0.14 4/14/2022 3692.282 6.917 14.240 0 0
9/14/2022 112.265 0.350 5.193 258.683 0.696 4.002 0 ‐‐‐ --- --- --- --- ---
--- --- --- --- --- --- --- 3.17 --- --- --- --- 1.97 2.9
MGD CFS MGD CFS MGD CFS
Wet 1.838 2.844 Wet 1.885 2.917 Wet 9.352 14.470
Dry 0.958 1.482 Dry 1.290 1.996 Dry 10.438 16.150
`
Page 917 of 1493
Page 918
TECsmith
TECSMITH, Inc.
PO Box 95
Clarence, NY 14031
Tel: 716-462-0382
Date: September 15, 2022
SANITARY SEWER FLOW CAPACITY STUDY – Summary Review
Prepared For: 1130 Orchard Park Road Capacity Analysis
R. Christopher Wood, PE Partner
487 Main Street, Suite 500
Buffalo, New York 14203
Project Name: 1130 Orchard Park Road Capacity Analysis
Flow Monitoring Period: August 16, 2022 to September 14, 2022
Rain Events (> 0.5-inches) Monitored: August 30 (0.97”), and September 5 (0.72”)
Number of Monitoring Nodes: Two (2) downstream manholes
Node Locations and Descriptions:
• Node 1 1001 Orchard Park Rd (12”)
• Node 2 Orchard Park Rd 15" (15”)
Summary Conclusion:
Based on the data presented in this report, specifically the flow depth measurements recorded
(see graphs below)
• One time the flow depth exceeds pipe diameter at all nodes of the downstream
monitoring points during the wet weather events monitored.
water and wastewater monitoring specialists
Page 918 of 1493
Page 919
7(&smith
7(&60,7+,QF
32%R[
(OPD1HZ<RUN
7HO
)D[
'DWH$SULO
6$1,7$5<6(:(5)/2:&$3$&,7<678'<±6XPPDU\5HYLHZ
3UHSDUHG)RU2UFKDUG3DUN5RDG&DSDFLW\$QDO\VLV
5&KULVWRSKHU:RRG3(3DUWQHU
0DLQ6WUHHW6XLWH
%XIIDOR1HZ<RUN
3URMHFW1DPH2UFKDUG3DUN5RDG&DSDFLW\$QDO\VLV
)ORZ0RQLWRULQJ3HULRG0DUFKWR$SULO
5DLQ(YHQWV !LQFKHV 0RQLWRUHG0DUFK ´
1XPEHURI0RQLWRULQJ1RGHV7KUHH GRZQVWUHDPPDQKROHV
1RGH/RFDWLRQVDQG'HVFULSWLRQV
x 1RGH0DUWKD 3DUN 5G
2UFKDUG
x 1RGH :DUQHU
2UFKDUG 3DUN 5G
x 1RGH 7UDQVLW5RDG
2UFKDUG 3DUN 5G
)DLUID[
6XPPDU\&RQFOXVLRQ
%DVHGRQWKHGDWDSUHVHQWHGLQWKLVUHSRUWVSHFLILFDOO\WKHIORZGHSWKPHDVXUHPHQWVUHFRUGHG
VHHJUDSKVEHORZ
x 2QHWLPHWKHIORZGHSWKH[FHHGVSLSHGLDPHWHUDW1RGHRIWKHGRZQVWUHDPPRQLWRULQJ
SRLQWVGXULQJWKHZHWZHDWKHUHYHQWVPRQLWRUHG
x 7ZRWLPHVWKHIORZGHSWKH[FHHGVSLSHGLDPHWHUDW1RGHRIWKHGRZQVWUHDPPRQLWRULQJ
SRLQWVGXULQJWKHZHWZHDWKHUHYHQWVPRQLWRUHG
x $WQRWLPHWKHIORZGHSWKH[FHHGVSLSHGLDPHWHUDW1RGHRIWKHGRZQVWUHDPPRQLWRULQJ
SRLQWVGXULQJWKHZHWZHDWKHUHYHQWVPRQLWRUHG
water and wastewater monitoring specialists
Page 919 of 1493
Page 920
TECsmith
TECSMITH, Inc.
PO Box 95
Clarence, NY 14031
Tel: 716-462-0382
Depth of Flow Capacity Summary:
Depth of flow capacity is based on diameter of pipe. See graphs below.
• One time during the monitoring period did depth of flow exceed pipe diameter at Node 1.
Node 1
35
30
25
Level and Pipe Size
20
15
10
5
0
17-Aug-22
18-Aug-22
19-Aug-22
20-Aug-22
20-Aug-22
21-Aug-22
22-Aug-22
23-Aug-22
24-Aug-22
25-Aug-22
25-Aug-22
26-Aug-22
27-Aug-22
28-Aug-22
29-Aug-22
30-Aug-22
30-Aug-22
31-Aug-22
1-Sep-22
2-Sep-22
3-Sep-22
4-Sep-22
4-Sep-22
5-Sep-22
6-Sep-22
7-Sep-22
8-Sep-22
9-Sep-22
9-Sep-22
10-Sep-22
11-Sep-22
12-Sep-22
13-Sep-22
14-Sep-22
Level Pipe Size (in.)
water and wastewater monitoring specialists
Page 920 of 1493
Page 921
•
Level and Pipe Size
10
20
30
40
50
60
70
0
17-Aug-22
18-Aug-22
19-Aug-22
19-Aug-22
TECsmith
20-Aug-22
21-Aug-22
22-Aug-22
22-Aug-22
23-Aug-22
24-Aug-22
25-Aug-22
26-Aug-22
26-Aug-22
27-Aug-22
28-Aug-22
Level
29-Aug-22
29-Aug-22
30-Aug-22
Node 2
31-Aug-22
1-Sep-22
2-Sep-22
Pipe Size
2-Sep-22
3-Sep-22
water and wastewater monitoring specialists
4-Sep-22
5-Sep-22
6-Sep-22
6-Sep-22
7-Sep-22
8-Sep-22
9-Sep-22
9-Sep-22
10-Sep-22
11-Sep-22
One time during the monitoring period did depth of flow exceed pipe diameter at Node 2.
12-Sep-22
13-Sep-22
13-Sep-22
PO Box 95
Clarence, NY 14031
TECSMITH, Inc.
Tel: 716-462-0382
Page 921 of 1493
Page 922
>ĞǀĞůĂŶĚWŝƉĞ^ŝnjĞ
ϭϬ
ϮϬ
ϯϬ
ϰϬ
ϱϬ
ϲϬ
Ϭ
ϭϳͲDĂƌͲϮϮ
ϭϴͲDĂƌͲϮϮ
ϭϵͲDĂƌͲϮϮ
ϭϵͲDĂƌͲϮϮ
ϮϬͲDĂƌͲϮϮ
7(&smith
ϮϭͲDĂƌͲϮϮ
ϮϮͲDĂƌͲϮϮ
ϮϮͲDĂƌͲϮϮ
ϮϯͲDĂƌͲϮϮ
ϮϰͲDĂƌͲϮϮ
ϮϱͲDĂƌͲϮϮ
ϮϱͲDĂƌͲϮϮ
ϮϲͲDĂƌͲϮϮ
ϮϳͲDĂƌͲϮϮ
ϮϴͲDĂƌͲϮϮ
ϮϵͲDĂƌͲϮϮ
>ĞǀĞů
ϮϵͲDĂƌͲϮϮ
ϯϬͲDĂƌͲϮϮ
ϯϭͲDĂƌͲϮϮ
EŽĚĞϯ
ϭͲƉƌͲϮϮ
ϭͲƉƌͲϮϮ
WŝƉĞ^ŝnjĞ
ϮͲƉƌͲϮϮ
ϯͲƉƌͲϮϮ
ϰͲƉƌͲϮϮ
water and wastewater monitoring specialists
ϰͲƉƌͲϮϮ
ϱͲƉƌͲϮϮ
ϲͲƉƌͲϮϮ
ϳͲƉƌͲϮϮ
ϴͲƉƌͲϮϮ
ϴͲƉƌͲϮϮ
ϵͲƉƌͲϮϮ
ϭϬͲƉƌͲϮϮ
ϭϭͲƉƌͲϮϮ
ϭϭͲƉƌͲϮϮ
x $WQRWLPHGXULQJWKHPRQLWRULQJSHULRGGLGGHSWKRIIORZH[FHHGSLSHGLDPHWHUDW1RGH
ϭϮͲƉƌͲϮϮ
ϭϯͲƉƌͲϮϮ
ϭϰͲƉƌͲϮϮ
(OPD1HZ<RUN
7HO
7(&60,7+,QF
)D[
32%R[
Page 922 of 1493
Page 923
Sewer Node Maps
Page 923 of 1493
Page 924
Page 924 of 1493
Page 925
Page 925 of 1493
Page 926
Page 926 of 1493
Page 927
Appendix D
Storm Water Calculations
Page 927 of 1493
Page 928
Calculate Water Quality Volume
Is this project subject to Section 4.3 of the NYS Design Manual for Enhanced Phosphorus
Removal? No
What is the nature of this construction project? New Construction
Design Point: 1
Enter 90% Rainfall Event as P
P= 1.00 inches
Calculate Required WQv
Contributing Percent
Drainage Area Impervious Area WQv SMP
Area Impervious Rv
Number (Acres) (cf) Description
(Acres) %
Filtration
1 3.66 1.89 52 0.51 6,839
Bioretention
Filtration
2 2.16 1.07 50 0.50 3,888
Bioretention
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Total 5.82 2.96 51 0.51 10727 Required WQv
Page 928 of 1493
Page 929
Calcuate Minimum RRv Required
Enter the Soils Data for the site
Hydrologic Soil
Acres S
Group
A 55%
B 40%
C 30%
D 2.96 20%
Total Area 2.96
Calculate the Minimum RRv
S= 0.20
Impervious = 2.96 acres
Precipitation 1.00 inches
Rv 0.95
Minimum RRv 0.047 af
2047 cf
Page 929 of 1493
Page 930
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
1 3.66 1.89 52 0.51 6,839 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) >2
Enter depth to bedrock (ft) >2
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 15
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 2850 sf
Enter Provided Filter Area Af 2855 sf
Recalculated Water Quality Volume (based on
WQv calc 6852 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 2,741 cf
This is the portion of the WQv that is not reduced in
WQv Treated 4098 cf
the practice.
Page 930 of 1493
Page 931
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
2 2.16 1.07 50 0.50 3,888 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) >2
Enter depth to bedrock (ft) >2
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 15
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 1620 sf
Enter Provided Filter Area Af 1705 sf
Recalculated Water Quality Volume (based on
WQv calc 4092 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 1,637 cf
This is the portion of the WQv that is not reduced in
WQv Treated 2251 cf
the practice.
Page 931 of 1493
Page 932
Filtration Bioretention (F-5)
Total Area 5.82 acres
Total Impervious 3 acres
Total RRv Provided 4,378 cf
Total WQv Provided 6,349 cf
Page 932 of 1493
Page 933
1S
Existing - North
2S
Existing - South
Subcat Reach Pond Link Routing Diagram for 23-4121 storm calcs - Existing
Prepared by Carmina Wood Design, Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC
Page 933 of 1493
Page 934
23-4121 storm calcs - Existing
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-Year Type II 24-hr Default 24.00 1 1.87 2
2 10-Year Type II 24-hr Default 24.00 1 3.14 2
3 25-Year Type II 24-hr Default 24.00 1 3.84 2
4 100-Year Type II 24-hr Default 24.00 1 5.23 2
Page 934 of 1493
Page 935
23-4121 storm calcs - Existing
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (all nodes)
Area CN Description
(sq-ft) (subcatchment-numbers)
225,751 80 Pasture/grassland/range, Good, HSG D (1S, 2S)
49,422 79 Woods/grass comb., Good, HSG D (1S)
275,173 80 TOTAL AREA
Page 935 of 1493
Page 936
23-4121 storm calcs - Existing
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (all nodes)
Area Soil Subcatchment
(sq-ft) Group Numbers
0 HSG A
0 HSG B
0 HSG C
275,173 HSG D 1S, 2S
0 Other
275,173 TOTAL AREA
Page 936 of 1493
Page 937
23-4121 storm calcs - Existing
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 5
Ground Covers (all nodes)
HSG-A HSG-B HSG-C HSG-D Other Total Ground
(sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) Cover
0 0 0 225,751 0 225,751 Pasture/grasslan
d/range, Good
0 0 0 49,422 0 49,422 Woods/grass
comb., Good
0 0 0 275,173 0 275,173 TOTAL AREA
Page 937 of 1493
Page 938
23-4121 storm calcs - Existing Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 6
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing - North Runoff Area=181,234 sf 0.00% Impervious Runoff Depth=0.48"
Flow Length=806' Tc=28.2 min CN=80 Runoff=1.59 cfs 7,325 cf
Subcatchment 2S: Existing - South Runoff Area=93,939 sf 0.00% Impervious Runoff Depth=0.48"
Flow Length=362' Slope=0.0370 '/' Tc=20.1 min CN=80 Runoff=1.04 cfs 3,797 cf
Total Runoff Area = 275,173 sf Runoff Volume = 11,121 cf Average Runoff Depth = 0.48"
100.00% Pervious = 275,173 sf 0.00% Impervious = 0 sf
Page 938 of 1493
Page 939
23-4121 storm calcs - Existing Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment 1S: Existing - North
Runoff = 1.59 cfs @ 12.25 hrs, Volume= 7,325 cf, Depth= 0.48"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
131,812 80 Pasture/grassland/range, Good, HSG D
49,422 79 Woods/grass comb., Good, HSG D
181,234 80 Weighted Average
181,234 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
16.9 150 0.0400 0.15 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
5.2 287 0.0170 0.91 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
4.0 284 0.0280 1.17 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
2.1 85 0.0180 0.67 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
28.2 806 Total
Subcatchment 1S: Existing - North
Hydrograph
Runoff
1.59 cfs
Type II 24-hr
1-Year Rainfall=1.87"
Runoff Area=181,234 sf
Runoff Volume=7,325 cf
Flow (cfs)
1
Runoff Depth=0.48"
Flow Length=806'
Tc=28.2 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 939 of 1493
Page 940
23-4121 storm calcs - Existing Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment 2S: Existing - South
Runoff = 1.04 cfs @ 12.15 hrs, Volume= 3,797 cf, Depth= 0.48"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
93,939 80 Pasture/grassland/range, Good, HSG D
93,939 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
17.5 150 0.0370 0.14 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
2.6 212 0.0370 1.35 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
20.1 362 Total
Subcatchment 2S: Existing - South
Hydrograph
Runoff
1.04 cfs
1 Type II 24-hr
1-Year Rainfall=1.87"
Runoff Area=93,939 sf
Runoff Volume=3,797 cf
Flow (cfs)
Runoff Depth=0.48"
Flow Length=362'
Slope=0.0370 '/'
Tc=20.1 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 940 of 1493
Page 941
23-4121 storm calcs - Existing Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 9
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing - North Runoff Area=181,234 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=806' Tc=28.2 min CN=80 Runoff=4.98 cfs 20,479 cf
Subcatchment 2S: Existing - South Runoff Area=93,939 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=362' Slope=0.0370 '/' Tc=20.1 min CN=80 Runoff=3.19 cfs 10,615 cf
Total Runoff Area = 275,173 sf Runoff Volume = 31,093 cf Average Runoff Depth = 1.36"
100.00% Pervious = 275,173 sf 0.00% Impervious = 0 sf
Page 941 of 1493
Page 942
23-4121 storm calcs - Existing Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment 1S: Existing - North
Runoff = 4.98 cfs @ 12.23 hrs, Volume= 20,479 cf, Depth= 1.36"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
131,812 80 Pasture/grassland/range, Good, HSG D
49,422 79 Woods/grass comb., Good, HSG D
181,234 80 Weighted Average
181,234 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
16.9 150 0.0400 0.15 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
5.2 287 0.0170 0.91 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
4.0 284 0.0280 1.17 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
2.1 85 0.0180 0.67 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
28.2 806 Total
Subcatchment 1S: Existing - North
Hydrograph
Runoff
4.98 cfs
5
Type II 24-hr
10-Year Rainfall=3.14"
4 Runoff Area=181,234 sf
Runoff Volume=20,479 cf
Flow (cfs)
3 Runoff Depth=1.36"
Flow Length=806'
2
Tc=28.2 min
CN=80
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 942 of 1493
Page 943
23-4121 storm calcs - Existing Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment 2S: Existing - South
Runoff = 3.19 cfs @ 12.13 hrs, Volume= 10,615 cf, Depth= 1.36"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
93,939 80 Pasture/grassland/range, Good, HSG D
93,939 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
17.5 150 0.0370 0.14 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
2.6 212 0.0370 1.35 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
20.1 362 Total
Subcatchment 2S: Existing - South
Hydrograph
Runoff
3.19 cfs
3
Type II 24-hr
10-Year Rainfall=3.14"
Runoff Area=93,939 sf
Runoff Volume=10,615 cf
Flow (cfs)
2
Runoff Depth=1.36"
Flow Length=362'
Slope=0.0370 '/'
1 Tc=20.1 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 943 of 1493
Page 944
23-4121 storm calcs - Existing Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 12
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing - North Runoff Area=181,234 sf 0.00% Impervious Runoff Depth=1.91"
Flow Length=806' Tc=28.2 min CN=80 Runoff=7.12 cfs 28,850 cf
Subcatchment 2S: Existing - South Runoff Area=93,939 sf 0.00% Impervious Runoff Depth=1.91"
Flow Length=362' Slope=0.0370 '/' Tc=20.1 min CN=80 Runoff=4.54 cfs 14,954 cf
Total Runoff Area = 275,173 sf Runoff Volume = 43,803 cf Average Runoff Depth = 1.91"
100.00% Pervious = 275,173 sf 0.00% Impervious = 0 sf
Page 944 of 1493
Page 945
23-4121 storm calcs - Existing Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 13
Summary for Subcatchment 1S: Existing - North
Runoff = 7.12 cfs @ 12.23 hrs, Volume= 28,850 cf, Depth= 1.91"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
131,812 80 Pasture/grassland/range, Good, HSG D
49,422 79 Woods/grass comb., Good, HSG D
181,234 80 Weighted Average
181,234 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
16.9 150 0.0400 0.15 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
5.2 287 0.0170 0.91 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
4.0 284 0.0280 1.17 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
2.1 85 0.0180 0.67 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
28.2 806 Total
Subcatchment 1S: Existing - North
Hydrograph
Runoff
7.12 cfs
7 Type II 24-hr
25-Year Rainfall=3.84"
6
Runoff Area=181,234 sf
5 Runoff Volume=28,850 cf
Flow (cfs)
Runoff Depth=1.91"
4
Flow Length=806'
3 Tc=28.2 min
CN=80
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 945 of 1493
Page 946
23-4121 storm calcs - Existing Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 14
Summary for Subcatchment 2S: Existing - South
Runoff = 4.54 cfs @ 12.13 hrs, Volume= 14,954 cf, Depth= 1.91"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
93,939 80 Pasture/grassland/range, Good, HSG D
93,939 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
17.5 150 0.0370 0.14 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
2.6 212 0.0370 1.35 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
20.1 362 Total
Subcatchment 2S: Existing - South
Hydrograph
5 Runoff
4.54 cfs
Type II 24-hr
4 25-Year Rainfall=3.84"
Runoff Area=93,939 sf
Runoff Volume=14,954 cf
3
Flow (cfs)
Runoff Depth=1.91"
Flow Length=362'
2
Slope=0.0370 '/'
Tc=20.1 min
1 CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 946 of 1493
Page 947
23-4121 storm calcs - Existing Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 15
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing - North Runoff Area=181,234 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=806' Tc=28.2 min CN=80 Runoff=11.60 cfs 46,735 cf
Subcatchment 2S: Existing - South Runoff Area=93,939 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=362' Slope=0.0370 '/' Tc=20.1 min CN=80 Runoff=7.37 cfs 24,224 cf
Total Runoff Area = 275,173 sf Runoff Volume = 70,959 cf Average Runoff Depth = 3.09"
100.00% Pervious = 275,173 sf 0.00% Impervious = 0 sf
Page 947 of 1493
Page 948
23-4121 storm calcs - Existing Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 16
Summary for Subcatchment 1S: Existing - North
Runoff = 11.60 cfs @ 12.22 hrs, Volume= 46,735 cf, Depth= 3.09"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
131,812 80 Pasture/grassland/range, Good, HSG D
49,422 79 Woods/grass comb., Good, HSG D
181,234 80 Weighted Average
181,234 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
16.9 150 0.0400 0.15 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
5.2 287 0.0170 0.91 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
4.0 284 0.0280 1.17 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
2.1 85 0.0180 0.67 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
28.2 806 Total
Subcatchment 1S: Existing - North
Hydrograph
Runoff
11.60 cfs
12
11
Type II 24-hr
10
100-Year Rainfall=5.23"
9 Runoff Area=181,234 sf
8 Runoff Volume=46,735 cf
Flow (cfs)
7 Runoff Depth=3.09"
6 Flow Length=806'
5 Tc=28.2 min
4 CN=80
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 948 of 1493
Page 949
23-4121 storm calcs - Existing Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 17
Summary for Subcatchment 2S: Existing - South
Runoff = 7.37 cfs @ 12.13 hrs, Volume= 24,224 cf, Depth= 3.09"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
93,939 80 Pasture/grassland/range, Good, HSG D
93,939 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
17.5 150 0.0370 0.14 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
2.6 212 0.0370 1.35 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
20.1 362 Total
Subcatchment 2S: Existing - South
Hydrograph
8 Runoff
7.37 cfs
7
Type II 24-hr
100-Year Rainfall=5.23"
6
Runoff Area=93,939 sf
5
Runoff Volume=24,224 cf
Flow (cfs)
Runoff Depth=3.09"
4
Flow Length=362'
3 Slope=0.0370 '/'
Tc=20.1 min
2
CN=80
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 949 of 1493
Page 950
1S
Proposed - North
1P 3S
2S Detention Pond Direct
Proposed - South
Subcat Reach Pond Link Routing Diagram for 23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design, Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC
Page 950 of 1493
Page 951
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-Year Type II 24-hr Default 24.00 1 1.87 2
2 10-Year Type II 24-hr Default 24.00 1 3.14 2
3 25-Year Type II 24-hr Default 24.00 1 3.84 2
4 100-Year Type II 24-hr Default 24.00 1 5.23 2
Page 951 of 1493
Page 952
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (all nodes)
Area CN Description
(sq-ft) (subcatchment-numbers)
146,543 80 >75% Grass cover, Good, HSG D (1S, 2S, 3S)
1,626 98 Concrete, HSG D (2S)
67,908 98 Paved parking, HSG D (1S, 2S)
55,578 98 Roofs, HSG D (1S, 2S)
3,518 98 Sidewalk, HSG D (1S)
275,173 88 TOTAL AREA
Page 952 of 1493
Page 953
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (all nodes)
Area Soil Subcatchment
(sq-ft) Group Numbers
0 HSG A
0 HSG B
0 HSG C
275,173 HSG D 1S, 2S, 3S
0 Other
275,173 TOTAL AREA
Page 953 of 1493
Page 954
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 5
Ground Covers (all nodes)
HSG-A HSG-B HSG-C HSG-D Other Total Ground Su
(sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) Cover Nu
0 0 0 146,543 0 146,543 >75% Grass
cover, Good
0 0 0 1,626 0 1,626 Concrete
0 0 0 67,908 0 67,908 Paved parking
0 0 0 55,578 0 55,578 Roofs
0 0 0 3,518 0 3,518 Sidewalk
0 0 0 275,173 0 275,173 TOTAL AREA
Page 954 of 1493
Page 955
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 6
Pipe Listing (all nodes)
Line# Node In-Invert Out-Invert Length Slope n Width Diam/Height Inside-Fill Node
Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) Name
1 1S 0.00 0.00 182.0 0.0050 0.013 0.0 6.0 0.0
2 1S 0.00 0.00 70.0 0.0070 0.013 0.0 12.0 0.0
3 1S 0.00 0.00 400.0 0.0100 0.013 0.0 12.0 0.0
4 2S 0.00 0.00 194.0 0.0050 0.013 0.0 8.0 0.0
5 2S 0.00 0.00 209.0 0.0080 0.013 0.0 12.0 0.0
6 2S 0.00 0.00 171.0 0.0110 0.013 0.0 12.0 0.0
7 1P 669.00 668.92 17.0 0.0047 0.013 0.0 8.0 0.0
8 1P 668.92 668.80 25.0 0.0048 0.013 0.0 8.0 0.0
Page 955 of 1493
Page 956
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 7
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=0.92"
Flow Length=738' Tc=24.8 min CN=89 Runoff=3.28 cfs 12,245 cf
Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=0.92"
Flow Length=627' Tc=19.8 min CN=89 Runoff=2.21 cfs 7,211 cf
Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=0.48"
Flow Length=58' Tc=7.8 min CN=80 Runoff=0.38 cfs 878 cf
Pond 1P: Detention Pond Peak Elev=671.04' Storage=5,335 cf Inflow=5.40 cfs 19,456 cf
Outflow=1.94 cfs 19,456 cf
Total Runoff Area = 275,173 sf Runoff Volume = 20,334 cf Average Runoff Depth = 0.89"
53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf
Page 956 of 1493
Page 957
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment 1S: Proposed - North
[47] Hint: Peak is 826% of capacity of segment #3
[47] Hint: Peak is 110% of capacity of segment #4
Runoff = 3.28 cfs @ 12.19 hrs, Volume= 12,245 cf, Depth= 0.92"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
32,787 98 Roofs, HSG D
45,906 98 Paved parking, HSG D
* 3,518 98 Sidewalk, HSG D
77,291 80 >75% Grass cover, Good, HSG D
159,502 89 Weighted Average
77,291 48.46% Pervious Area
82,211 51.54% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.4 21 0.0090 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.1 65 0.0100 0.07 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.5 182 0.0050 2.02 0.40 Pipe Channel, 6" @ 0.5%
6.0" Round Area= 0.2 sf Perim= 1.6' r= 0.13'
n= 0.013 Corrugated PE, smooth interior
0.3 70 0.0070 3.80 2.98 Pipe Channel, 12" @ 0.7%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
1.5 400 0.0100 4.54 3.56 Pipe Channel, 12" @ 1.0%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
24.8 738 Total
Page 957 of 1493
Page 958
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 9
Subcatchment 1S: Proposed - North
Hydrograph
Runoff
3.28 cfs
Type II 24-hr
3
1-Year Rainfall=1.87"
Runoff Area=159,502 sf
Runoff Volume=12,245 cf
Flow (cfs)
2 Runoff Depth=0.92"
Flow Length=738'
Tc=24.8 min
1
CN=89
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 958 of 1493
Page 959
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment 2S: Proposed - South
[47] Hint: Peak is 258% of capacity of segment #3
Runoff = 2.21 cfs @ 12.13 hrs, Volume= 7,211 cf, Depth= 0.92"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
22,791 98 Roofs, HSG D
22,002 98 Paved parking, HSG D
* 1,626 98 Concrete, HSG D
47,520 80 >75% Grass cover, Good, HSG D
93,939 89 Weighted Average
47,520 50.59% Pervious Area
46,419 49.41% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.4 10 0.0900 0.12 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.6 43 0.0040 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.3 194 0.0050 2.45 0.85 Pipe Channel, 8" @ 0.5%
8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'
n= 0.013 Corrugated PE, smooth interior
0.9 209 0.0080 4.06 3.19 Pipe Channel, 12" @ 0.8%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.6 171 0.0110 4.76 3.74 Pipe Channel, 12" @ 1.1%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
19.8 627 Total
Page 959 of 1493
Page 960
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 11
Subcatchment 2S: Proposed - South
Hydrograph
Runoff
2.21 cfs
Type II 24-hr
2
1-Year Rainfall=1.87"
Runoff Area=93,939 sf
Runoff Volume=7,211 cf
Flow (cfs)
Runoff Depth=0.92"
Flow Length=627'
1
Tc=19.8 min
CN=89
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 960 of 1493
Page 961
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 12
Summary for Subcatchment 3S: Direct
Runoff = 0.38 cfs @ 12.00 hrs, Volume= 878 cf, Depth= 0.48"
Routed to nonexistent node 2P
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
21,732 80 >75% Grass cover, Good, HSG D
21,732 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.4 10 0.0100 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
4.4 48 0.1200 0.18 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
7.8 58 Total
Subcatchment 3S: Direct
Hydrograph
0.42 Runoff
0.4
0.38 cfs
0.38
0.36
Type II 24-hr
0.34
0.32
1-Year Rainfall=1.87"
0.3
0.28
Runoff Area=21,732 sf
0.26
Runoff Volume=878 cf
Flow (cfs)
0.24
0.22
0.2
Runoff Depth=0.48"
0.18
0.16
Flow Length=58'
0.14
0.12
Tc=7.8 min
0.1
0.08
CN=80
0.06
0.04
0.02
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 961 of 1493
Page 962
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 13
Summary for Pond 1P: Detention Pond
Inflow Area = 253,441 sf, 50.75% Impervious, Inflow Depth = 0.92" for 1-Year event
Inflow = 5.40 cfs @ 12.16 hrs, Volume= 19,456 cf
Outflow = 1.94 cfs @ 12.51 hrs, Volume= 19,456 cf, Atten= 64%, Lag= 21.3 min
Primary = 1.94 cfs @ 12.51 hrs, Volume= 19,456 cf
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 671.04' @ 12.51 hrs Surf.Area= 4,107 sf Storage= 5,335 cf
Plug-Flow detention time= 26.2 min calculated for 19,456 cf (100% of inflow)
Center-of-Mass det. time= 26.2 min ( 873.2 - 847.0 )
Volume Invert Avail.Storage Storage Description
#1 669.00' 38,878 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
669.00 0 0 0
670.00 3,130 1,565 1,565
671.00 4,065 3,598 5,163
672.00 5,060 4,563 9,725
673.00 6,110 5,585 15,310
674.00 13,125 9,618 24,928
675.00 14,775 13,950 38,878
Device Routing Invert Outlet Devices
#1 Device 3 669.00' 8.0" Round Culvert
L= 17.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 669.00' / 668.92' S= 0.0047 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 3 674.80' 24.0" x 24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Primary 668.92' 8.0" Round Culvert
L= 25.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 668.92' / 668.80' S= 0.0048 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=1.94 cfs @ 12.51 hrs HW=671.04' (Free Discharge)
3=Culvert (Passes 1.94 cfs of 1.98 cfs potential flow)
1=Culvert (Inlet Controls 1.94 cfs @ 5.55 fps)
2=Orifice/Grate ( Controls 0.00 cfs)
Page 962 of 1493
Page 963
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 14
Pond 1P: Detention Pond
Hydrograph
Inflow
6 5.40 cfs Primary
Inflow Area=253,441 sf
5 Peak Elev=671.04'
Storage=5,335 cf
4
Flow (cfs)
3
1.94 cfs
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 963 of 1493
Page 964
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 15
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=2.03"
Flow Length=738' Tc=24.8 min CN=89 Runoff=7.22 cfs 26,940 cf
Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=2.03"
Flow Length=627' Tc=19.8 min CN=89 Runoff=4.85 cfs 15,867 cf
Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=58' Tc=7.8 min CN=80 Runoff=1.12 cfs 2,456 cf
Pond 1P: Detention Pond Peak Elev=672.95' Storage=15,013 cf Inflow=11.90 cfs 42,807 cf
Outflow=2.82 cfs 42,807 cf
Total Runoff Area = 275,173 sf Runoff Volume = 45,263 cf Average Runoff Depth = 1.97"
53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf
Page 964 of 1493
Page 965
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 16
Summary for Subcatchment 1S: Proposed - North
[47] Hint: Peak is 1821% of capacity of segment #3
[47] Hint: Peak is 242% of capacity of segment #4
[47] Hint: Peak is 203% of capacity of segment #5
Runoff = 7.22 cfs @ 12.18 hrs, Volume= 26,940 cf, Depth= 2.03"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
32,787 98 Roofs, HSG D
45,906 98 Paved parking, HSG D
* 3,518 98 Sidewalk, HSG D
77,291 80 >75% Grass cover, Good, HSG D
159,502 89 Weighted Average
77,291 48.46% Pervious Area
82,211 51.54% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.4 21 0.0090 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.1 65 0.0100 0.07 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.5 182 0.0050 2.02 0.40 Pipe Channel, 6" @ 0.5%
6.0" Round Area= 0.2 sf Perim= 1.6' r= 0.13'
n= 0.013 Corrugated PE, smooth interior
0.3 70 0.0070 3.80 2.98 Pipe Channel, 12" @ 0.7%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
1.5 400 0.0100 4.54 3.56 Pipe Channel, 12" @ 1.0%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
24.8 738 Total
Page 965 of 1493
Page 966
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 17
Subcatchment 1S: Proposed - North
Hydrograph
8 Runoff
7.22 cfs
7 Type II 24-hr
10-Year Rainfall=3.14"
6
Runoff Area=159,502 sf
5 Runoff Volume=26,940 cf
Flow (cfs)
Runoff Depth=2.03"
4
Flow Length=738'
3 Tc=24.8 min
CN=89
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 966 of 1493
Page 967
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 18
Summary for Subcatchment 2S: Proposed - South
[47] Hint: Peak is 567% of capacity of segment #3
[47] Hint: Peak is 152% of capacity of segment #4
[47] Hint: Peak is 130% of capacity of segment #5
Runoff = 4.85 cfs @ 12.12 hrs, Volume= 15,867 cf, Depth= 2.03"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
22,791 98 Roofs, HSG D
22,002 98 Paved parking, HSG D
* 1,626 98 Concrete, HSG D
47,520 80 >75% Grass cover, Good, HSG D
93,939 89 Weighted Average
47,520 50.59% Pervious Area
46,419 49.41% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.4 10 0.0900 0.12 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.6 43 0.0040 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.3 194 0.0050 2.45 0.85 Pipe Channel, 8" @ 0.5%
8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'
n= 0.013 Corrugated PE, smooth interior
0.9 209 0.0080 4.06 3.19 Pipe Channel, 12" @ 0.8%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.6 171 0.0110 4.76 3.74 Pipe Channel, 12" @ 1.1%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
19.8 627 Total
Page 967 of 1493
Page 968
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 19
Subcatchment 2S: Proposed - South
Hydrograph
Runoff
4.85 cfs
5
Type II 24-hr
10-Year Rainfall=3.14"
4
Runoff Area=93,939 sf
Runoff Volume=15,867 cf
Flow (cfs)
3 Runoff Depth=2.03"
Flow Length=627'
2 Tc=19.8 min
CN=89
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 968 of 1493
Page 969
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 20
Summary for Subcatchment 3S: Direct
Runoff = 1.12 cfs @ 12.00 hrs, Volume= 2,456 cf, Depth= 1.36"
Routed to nonexistent node 2P
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
21,732 80 >75% Grass cover, Good, HSG D
21,732 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.4 10 0.0100 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
4.4 48 0.1200 0.18 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
7.8 58 Total
Subcatchment 3S: Direct
Hydrograph
Runoff
1.12 cfs
Type II 24-hr
1
10-Year Rainfall=3.14"
Runoff Area=21,732 sf
Runoff Volume=2,456 cf
Flow (cfs)
Runoff Depth=1.36"
Flow Length=58'
Tc=7.8 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 969 of 1493
Page 970
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 21
Summary for Pond 1P: Detention Pond
Inflow Area = 253,441 sf, 50.75% Impervious, Inflow Depth = 2.03" for 10-Year event
Inflow = 11.90 cfs @ 12.15 hrs, Volume= 42,807 cf
Outflow = 2.82 cfs @ 12.64 hrs, Volume= 42,807 cf, Atten= 76%, Lag= 29.2 min
Primary = 2.82 cfs @ 12.64 hrs, Volume= 42,807 cf
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 672.95' @ 12.64 hrs Surf.Area= 6,059 sf Storage= 15,013 cf
Plug-Flow detention time= 47.9 min calculated for 42,782 cf (100% of inflow)
Center-of-Mass det. time= 47.9 min ( 872.3 - 824.5 )
Volume Invert Avail.Storage Storage Description
#1 669.00' 38,878 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
669.00 0 0 0
670.00 3,130 1,565 1,565
671.00 4,065 3,598 5,163
672.00 5,060 4,563 9,725
673.00 6,110 5,585 15,310
674.00 13,125 9,618 24,928
675.00 14,775 13,950 38,878
Device Routing Invert Outlet Devices
#1 Device 3 669.00' 8.0" Round Culvert
L= 17.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 669.00' / 668.92' S= 0.0047 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 3 674.80' 24.0" x 24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Primary 668.92' 8.0" Round Culvert
L= 25.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 668.92' / 668.80' S= 0.0048 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=2.82 cfs @ 12.64 hrs HW=672.95' (Free Discharge)
3=Culvert (Passes 2.82 cfs of 2.85 cfs potential flow)
1=Culvert (Inlet Controls 2.82 cfs @ 8.08 fps)
2=Orifice/Grate ( Controls 0.00 cfs)
Page 970 of 1493
Page 971
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 22
Pond 1P: Detention Pond
Hydrograph
Inflow
11.90 cfs Primary
13
12 Inflow Area=253,441 sf
11 Peak Elev=672.95'
10
Storage=15,013 cf
9
8
Flow (cfs)
7
6
5
4
2.82 cfs
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 971 of 1493
Page 972
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 23
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=2.67"
Flow Length=738' Tc=24.8 min CN=89 Runoff=9.47 cfs 35,532 cf
Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=2.67"
Flow Length=627' Tc=19.8 min CN=89 Runoff=6.35 cfs 20,927 cf
Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=1.91"
Flow Length=58' Tc=7.8 min CN=80 Runoff=1.57 cfs 3,459 cf
Pond 1P: Detention Pond Peak Elev=673.70' Storage=21,268 cf Inflow=15.59 cfs 56,458 cf
Outflow=3.10 cfs 56,458 cf
Total Runoff Area = 275,173 sf Runoff Volume = 59,918 cf Average Runoff Depth = 2.61"
53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf
Page 972 of 1493
Page 973
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 24
Summary for Subcatchment 1S: Proposed - North
[47] Hint: Peak is 2386% of capacity of segment #3
[47] Hint: Peak is 318% of capacity of segment #4
[47] Hint: Peak is 266% of capacity of segment #5
Runoff = 9.47 cfs @ 12.18 hrs, Volume= 35,532 cf, Depth= 2.67"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
32,787 98 Roofs, HSG D
45,906 98 Paved parking, HSG D
* 3,518 98 Sidewalk, HSG D
77,291 80 >75% Grass cover, Good, HSG D
159,502 89 Weighted Average
77,291 48.46% Pervious Area
82,211 51.54% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.4 21 0.0090 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.1 65 0.0100 0.07 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.5 182 0.0050 2.02 0.40 Pipe Channel, 6" @ 0.5%
6.0" Round Area= 0.2 sf Perim= 1.6' r= 0.13'
n= 0.013 Corrugated PE, smooth interior
0.3 70 0.0070 3.80 2.98 Pipe Channel, 12" @ 0.7%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
1.5 400 0.0100 4.54 3.56 Pipe Channel, 12" @ 1.0%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
24.8 738 Total
Page 973 of 1493
Page 974
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 25
Subcatchment 1S: Proposed - North
Hydrograph
Runoff
10 9.47 cfs
9
Type II 24-hr
25-Year Rainfall=3.84"
8
Runoff Area=159,502 sf
7
Runoff Volume=35,532 cf
Flow (cfs)
6
Runoff Depth=2.67"
5 Flow Length=738'
4 Tc=24.8 min
3 CN=89
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 974 of 1493
Page 975
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 26
Summary for Subcatchment 2S: Proposed - South
[47] Hint: Peak is 743% of capacity of segment #3
[47] Hint: Peak is 199% of capacity of segment #4
[47] Hint: Peak is 170% of capacity of segment #5
Runoff = 6.35 cfs @ 12.12 hrs, Volume= 20,927 cf, Depth= 2.67"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
22,791 98 Roofs, HSG D
22,002 98 Paved parking, HSG D
* 1,626 98 Concrete, HSG D
47,520 80 >75% Grass cover, Good, HSG D
93,939 89 Weighted Average
47,520 50.59% Pervious Area
46,419 49.41% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.4 10 0.0900 0.12 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.6 43 0.0040 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.3 194 0.0050 2.45 0.85 Pipe Channel, 8" @ 0.5%
8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'
n= 0.013 Corrugated PE, smooth interior
0.9 209 0.0080 4.06 3.19 Pipe Channel, 12" @ 0.8%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.6 171 0.0110 4.76 3.74 Pipe Channel, 12" @ 1.1%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
19.8 627 Total
Page 975 of 1493
Page 976
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 27
Subcatchment 2S: Proposed - South
Hydrograph
7 Runoff
6.35 cfs
6
Type II 24-hr
25-Year Rainfall=3.84"
5 Runoff Area=93,939 sf
Runoff Volume=20,927 cf
Flow (cfs)
4
Runoff Depth=2.67"
Flow Length=627'
3
Tc=19.8 min
2 CN=89
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 976 of 1493
Page 977
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 28
Summary for Subcatchment 3S: Direct
Runoff = 1.57 cfs @ 11.99 hrs, Volume= 3,459 cf, Depth= 1.91"
Routed to nonexistent node 2P
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
21,732 80 >75% Grass cover, Good, HSG D
21,732 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.4 10 0.0100 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
4.4 48 0.1200 0.18 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
7.8 58 Total
Subcatchment 3S: Direct
Hydrograph
Runoff
1.57 cfs
Type II 24-hr
25-Year Rainfall=3.84"
Runoff Area=21,732 sf
Runoff Volume=3,459 cf
Flow (cfs)
1
Runoff Depth=1.91"
Flow Length=58'
Tc=7.8 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 977 of 1493
Page 978
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 29
Summary for Pond 1P: Detention Pond
Inflow Area = 253,441 sf, 50.75% Impervious, Inflow Depth = 2.67" for 25-Year event
Inflow = 15.59 cfs @ 12.15 hrs, Volume= 56,458 cf
Outflow = 3.10 cfs @ 12.70 hrs, Volume= 56,458 cf, Atten= 80%, Lag= 33.0 min
Primary = 3.10 cfs @ 12.70 hrs, Volume= 56,458 cf
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 673.70' @ 12.70 hrs Surf.Area= 10,997 sf Storage= 21,268 cf
Plug-Flow detention time= 60.6 min calculated for 56,426 cf (100% of inflow)
Center-of-Mass det. time= 60.6 min ( 877.2 - 816.6 )
Volume Invert Avail.Storage Storage Description
#1 669.00' 38,878 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
669.00 0 0 0
670.00 3,130 1,565 1,565
671.00 4,065 3,598 5,163
672.00 5,060 4,563 9,725
673.00 6,110 5,585 15,310
674.00 13,125 9,618 24,928
675.00 14,775 13,950 38,878
Device Routing Invert Outlet Devices
#1 Device 3 669.00' 8.0" Round Culvert
L= 17.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 669.00' / 668.92' S= 0.0047 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 3 674.80' 24.0" x 24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Primary 668.92' 8.0" Round Culvert
L= 25.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 668.92' / 668.80' S= 0.0048 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=3.10 cfs @ 12.70 hrs HW=673.70' (Free Discharge)
3=Culvert (Passes 3.10 cfs of 3.13 cfs potential flow)
1=Culvert (Inlet Controls 3.10 cfs @ 8.87 fps)
2=Orifice/Grate ( Controls 0.00 cfs)
Page 978 of 1493
Page 979
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 30
Pond 1P: Detention Pond
Hydrograph
Inflow
15.59 cfs Primary
17
16 Inflow Area=253,441 sf
15
14 Peak Elev=673.70'
13
12
Storage=21,268 cf
11
Flow (cfs)
10
9
8
7
6
5
4 3.10 cfs
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 979 of 1493
Page 980
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 31
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=3.99"
Flow Length=738' Tc=24.8 min CN=89 Runoff=13.94 cfs 53,068 cf
Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=3.99"
Flow Length=627' Tc=19.8 min CN=89 Runoff=9.33 cfs 31,254 cf
Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=58' Tc=7.8 min CN=80 Runoff=2.52 cfs 5,604 cf
Pond 1P: Detention Pond Peak Elev=674.73' Storage=34,966 cf Inflow=22.95 cfs 84,322 cf
Outflow=3.45 cfs 84,322 cf
Total Runoff Area = 275,173 sf Runoff Volume = 89,926 cf Average Runoff Depth = 3.92"
53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf
Page 980 of 1493
Page 981
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 32
Summary for Subcatchment 1S: Proposed - North
[47] Hint: Peak is 3513% of capacity of segment #3
[47] Hint: Peak is 468% of capacity of segment #4
[47] Hint: Peak is 391% of capacity of segment #5
Runoff = 13.94 cfs @ 12.17 hrs, Volume= 53,068 cf, Depth= 3.99"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
32,787 98 Roofs, HSG D
45,906 98 Paved parking, HSG D
* 3,518 98 Sidewalk, HSG D
77,291 80 >75% Grass cover, Good, HSG D
159,502 89 Weighted Average
77,291 48.46% Pervious Area
82,211 51.54% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.4 21 0.0090 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.1 65 0.0100 0.07 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.5 182 0.0050 2.02 0.40 Pipe Channel, 6" @ 0.5%
6.0" Round Area= 0.2 sf Perim= 1.6' r= 0.13'
n= 0.013 Corrugated PE, smooth interior
0.3 70 0.0070 3.80 2.98 Pipe Channel, 12" @ 0.7%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
1.5 400 0.0100 4.54 3.56 Pipe Channel, 12" @ 1.0%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
24.8 738 Total
Page 981 of 1493
Page 982
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 33
Subcatchment 1S: Proposed - North
Hydrograph
Runoff
15 13.94 cfs
14
Type II 24-hr
13
12
100-Year Rainfall=5.23"
11 Runoff Area=159,502 sf
10
Runoff Volume=53,068 cf
9
Flow (cfs)
8
Runoff Depth=3.99"
7 Flow Length=738'
6 Tc=24.8 min
5
CN=89
4
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 982 of 1493
Page 983
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 34
Summary for Subcatchment 2S: Proposed - South
[47] Hint: Peak is 1092% of capacity of segment #3
[47] Hint: Peak is 293% of capacity of segment #4
[47] Hint: Peak is 250% of capacity of segment #5
Runoff = 9.33 cfs @ 12.12 hrs, Volume= 31,254 cf, Depth= 3.99"
Routed to Pond 1P : Detention Pond
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
22,791 98 Roofs, HSG D
22,002 98 Paved parking, HSG D
* 1,626 98 Concrete, HSG D
47,520 80 >75% Grass cover, Good, HSG D
93,939 89 Weighted Average
47,520 50.59% Pervious Area
46,419 49.41% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.4 10 0.0900 0.12 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.6 43 0.0040 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.3 194 0.0050 2.45 0.85 Pipe Channel, 8" @ 0.5%
8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'
n= 0.013 Corrugated PE, smooth interior
0.9 209 0.0080 4.06 3.19 Pipe Channel, 12" @ 0.8%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.6 171 0.0110 4.76 3.74 Pipe Channel, 12" @ 1.1%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
19.8 627 Total
Page 983 of 1493
Page 984
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 35
Subcatchment 2S: Proposed - South
Hydrograph
Runoff
10 9.33 cfs
9 Type II 24-hr
8
100-Year Rainfall=5.23"
Runoff Area=93,939 sf
7
Runoff Volume=31,254 cf
6
Flow (cfs)
Runoff Depth=3.99"
5
Flow Length=627'
4 Tc=19.8 min
3 CN=89
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 984 of 1493
Page 985
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 36
Summary for Subcatchment 3S: Direct
Runoff = 2.52 cfs @ 11.99 hrs, Volume= 5,604 cf, Depth= 3.09"
Routed to nonexistent node 2P
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
21,732 80 >75% Grass cover, Good, HSG D
21,732 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.4 10 0.0100 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
4.4 48 0.1200 0.18 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
7.8 58 Total
Subcatchment 3S: Direct
Hydrograph
Runoff
2.52 cfs
Type II 24-hr
100-Year Rainfall=5.23"
2 Runoff Area=21,732 sf
Runoff Volume=5,604 cf
Flow (cfs)
Runoff Depth=3.09"
Flow Length=58'
1 Tc=7.8 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 985 of 1493
Page 986
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 37
Summary for Pond 1P: Detention Pond
Inflow Area = 253,441 sf, 50.75% Impervious, Inflow Depth = 3.99" for 100-Year event
Inflow = 22.95 cfs @ 12.15 hrs, Volume= 84,322 cf
Outflow = 3.45 cfs @ 12.81 hrs, Volume= 84,322 cf, Atten= 85%, Lag= 39.9 min
Primary = 3.45 cfs @ 12.81 hrs, Volume= 84,322 cf
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 674.73' @ 12.81 hrs Surf.Area= 14,332 sf Storage= 34,966 cf
Plug-Flow detention time= 89.0 min calculated for 84,273 cf (100% of inflow)
Center-of-Mass det. time= 89.0 min ( 894.3 - 805.3 )
Volume Invert Avail.Storage Storage Description
#1 669.00' 38,878 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
669.00 0 0 0
670.00 3,130 1,565 1,565
671.00 4,065 3,598 5,163
672.00 5,060 4,563 9,725
673.00 6,110 5,585 15,310
674.00 13,125 9,618 24,928
675.00 14,775 13,950 38,878
Device Routing Invert Outlet Devices
#1 Device 3 669.00' 8.0" Round Culvert
L= 17.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 669.00' / 668.92' S= 0.0047 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 3 674.80' 24.0" x 24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Primary 668.92' 8.0" Round Culvert
L= 25.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 668.92' / 668.80' S= 0.0048 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=3.45 cfs @ 12.81 hrs HW=674.73' (Free Discharge)
3=Culvert (Passes 3.45 cfs of 3.47 cfs potential flow)
1=Culvert (Inlet Controls 3.45 cfs @ 9.87 fps)
2=Orifice/Grate ( Controls 0.00 cfs)
Page 986 of 1493
Page 987
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 38
Pond 1P: Detention Pond
Hydrograph
Inflow
22.95 cfs Primary
24
Inflow Area=253,441 sf
22
20
Peak Elev=674.73'
18
Storage=34,966 cf
16
Flow (cfs)
14
12
10
8
6
3.45 cfs
4
2
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 987 of 1493
Page 988
Appendix E
Soil Information
Page 988 of 1493
Page 989
Hydrologic Soil Group—Erie County, New York
78° 46' 6'' W
78° 45' 44'' W
682440 682490 682540 682590 682640 682690 682740 682790 682840 682890 682940
42° 48' 45'' N 42° 48' 45'' N
4742410
4742410
4742360
4742360
4742310
4742310
4742260
4742260
4742210
4742210
4742160
4742160
4742110
Soil Map may not be valid at this scale.
4742110
42° 48' 34'' N 42° 48' 34'' N
682490 682540 682590 682640 682690 682740 682790 682840 682890 682940
Map Scale: 1:2,300 if printed on A landscape (11" x 8.5") sheet.
Meters
78° 46' 6'' W
78° 45' 44'' W
N 0 30 60 120 180
Feet
0 100 200 400 600
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84
Natural Resources Web Soil Survey 5/14/2026
Page 989 of 1493
Conservation Service National Cooperative Soil Survey Page 1 of 4
Page 990
Hydrologic Soil Group—Erie County, New York
MAP LEGEND MAP INFORMATION
Area of Interest (AOI) C The soil surveys that comprise your AOI were mapped at
Area of Interest (AOI) 1:15,800.
C/D
Soils Warning: Soil Map may not be valid at this scale.
D
Soil Rating Polygons
Not rated or not available Enlargement of maps beyond the scale of mapping can cause
A
misunderstanding of the detail of mapping and accuracy of soil
A/D Water Features line placement. The maps do not show the small areas of
Streams and Canals contrasting soils that could have been shown at a more detailed
B scale.
Transportation
B/D
Rails Please rely on the bar scale on each map sheet for map
C measurements.
Interstate Highways
C/D Source of Map: Natural Resources Conservation Service
US Routes
D
Web Soil Survey URL:
Major Roads Coordinate System: Web Mercator (EPSG:3857)
Not rated or not available
Local Roads Maps from the Web Soil Survey are based on the Web Mercator
Soil Rating Lines projection, which preserves direction and shape but distorts
Background
A distance and area. A projection that preserves area, such as the
Aerial Photography
Albers equal-area conic projection, should be used if more
A/D accurate calculations of distance or area are required.
B This product is generated from the USDA-NRCS certified data as
B/D
of the version date(s) listed below.
C Soil Survey Area: Erie County, New York
Survey Area Data: Version 25, Sep 4, 2025
C/D
Soil map units are labeled (as space allows) for map scales
D 1:50,000 or larger.
Not rated or not available Date(s) aerial images were photographed: May 13, 2023—May
27, 2023
Soil Rating Points
A The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
A/D imagery displayed on these maps. As a result, some minor
B shifting of map unit boundaries may be evident.
B/D
Natural Resources Web Soil Survey 5/14/2026
Page 990 of 1493
Conservation Service National Cooperative Soil Survey Page 2 of 4
Page 991
Hydrologic Soil Group—Erie County, New York
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
DbA Darien silt loam, 0 to 3 C/D 6.3 43.8%
percent slopes
Nh Niagara silt loam, till C/D 2.1 14.5%
substratum
RfB Remsen silty clay loam, D 6.0 41.7%
3 to 8 percent slopes
Totals for Area of Interest 14.5 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Natural Resources Web Soil Survey 5/14/2026
Conservation Service National Cooperative Soil Survey Page 3 of 4
Page 991 of 1493
Page 992
Hydrologic Soil Group—Erie County, New York
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Natural Resources Web Soil Survey 5/14/2026
Conservation Service National Cooperative Soil Survey Page 4 of 4
Page 992 of 1493
Page 993
Appendix E
NYSDEC SPDES General Permit for Stormwater Discharges from Construction
Activity Permit No. GP-0-25-001
Page 993 of 1493
Page 994
Page 994 of 1493
Page 995
PREFACE
Pursuant to Section 402 of the Clean Water Act (CWA), and 40 CFR
122.26(b)(14)(x), (15)(i), and (15)(ii), stormwater discharges from certain construction
activities are unlawful unless they are authorized by a National Pollutant Discharge
Elimination System (NPDES) permit or by a state permit program. New York State
administers the approved State Pollutant Discharge Elimination System (SPDES)
program with permits issued in accordance with the New York State Environmental
Conservation Law (ECL) Article 17, Titles 7 and 8, and Article 70, as well as 6 NYCRR
Parts 621 and 750.
Construction activities constitute construction of a point source and, therefore,
pursuant to ECL sections 17-0505, 17-0701, and 17-0803, the owner or operator must
have coverage under a SPDES permit prior to commencement of construction activities.
The owner or operator cannot wait until there is an actual discharge from the
construction site to obtain permit coverage.
*Note: The italicized words/phrases within this permit are defined in Appendix A.
Page 995 of 1493
Page 996
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
SPDES CONSTRUCTION GENERAL PERMIT (CGP) GP-0-25-001
FOR STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITIES
Table of Contents
Part I. How to Obtain Coverage and General Requirements ..................................... 5
A. Eligibility Requirements ...................................................................................... 5
B. Types of Discharges Authorized ........................................................................ 9
C. Prohibited Discharges ...................................................................................... 10
D. Electronic Notice of Intent (eNOI) Submittal..................................................... 10
E. General Requirements for Owners or Operators with Permit Coverage .......... 14
F. Permit Coverage for Discharges Authorized Under GP-0-20-001.................... 18
G. Change of Owner or Operator.......................................................................... 19
Part II. Water Quality-Based Effluent Limitations ..................................................... 20
A. Maintaining Water Quality ................................................................................ 20
B. Effluent Limitations Applicable to Discharges from Construction Activities ...... 20
C. Post-Construction Stormwater Management Practice (SMP) Requirements ... 23
Part III. Stormwater Pollution Prevention Plan (SWPPP) ......................................... 28
A. General SWPPP Requirements ....................................................................... 28
B. Required SWPPP Contents ............................................................................. 32
C. Required SWPPP Components by Project Type.............................................. 37
Part IV. Inspection and Maintenance Requirements ................................................ 37
A. General Construction Site Inspection and Maintenance Requirements ........... 37
B. Contractor Maintenance Inspection Requirements .......................................... 37
C. Qualified Inspector Inspection Requirements................................................... 38
Part V. How to Terminate CGP Coverage.................................................................. 43
A. Electronic Notice of Termination (eNOT) Submittal.......................................... 43
Part VI. Record Retention and Reporting.................................................................. 45
A. Record Retention ............................................................................................. 46
B. Reporting ......................................................................................................... 46
Part VII. Standard Permit Requirements ................................................................... 46
A. Duty to Comply................................................................................................. 46
B. Need to Halt or Reduce Activity Not a Defense................................................ 46
C. Penalties .......................................................................................................... 46
D. False Statements ............................................................................................. 47
E. Re-Opener Clause ........................................................................................... 47
F. Duty to Mitigate ................................................................................................ 47
G. Requiring Another General Permit or Individual SPDES Permit....................... 47
H. Duty to Provide Information.............................................................................. 49
I. Extension ......................................................................................................... 49
J. Signatories and Certification ............................................................................ 50
K. Inspection and Entry ........................................................................................ 52
L. Confidentiality of Information............................................................................ 53
M. Other Permits May Be Required ...................................................................... 53
Page 996 of 1493
Page 997
N. NYSDEC Orders or Civil Decrees/Judgments.................................................. 53
O. Property Rights ................................................................................................ 53
P. Compliance with Interstate Standards.............................................................. 53
Q. Oil and Hazardous Substance Liability............................................................. 54
R. Severability....................................................................................................... 54
S. NYSDEC Approved Forms............................................................................... 54
APPENDIX A – Abbreviations and Definitions.......................................................... 55
Abbreviations............................................................................................................. 55
Definitions.................................................................................................................. 56
APPENDIX B – Required SWPPP Components by Project Type............................. 64
Table 1....................................................................................................................... 64
Table 2....................................................................................................................... 66
APPENDIX C – Watersheds Requiring Enhanced Phosphorus Removal............... 68
APPENDIX D – Impaired Waterbodies (by Construction Related Pollutants) ........ 74
APPENDIX E – List of NYSDEC Regional Offices..................................................... 80
APPENDIX F – SWPPP Preparer Certification Form ................................................ 81
APPENDIX G – MS4 SWPPP Acceptance Form ........................................................ 83
APPENDIX H – NYCDEP SWPPP Acceptance/Approval Form ................................ 86
APPENDIX I – MS4 No Jurisdiction Form.................................................................. 89
APPENDIX J – Owner/Operator Certification Form .................................................. 91
Page 997 of 1493
Page 998
Part I.
Part I. How to Obtain Coverage and General Requirements
To be covered under this permit, the owner or operator must meet all eligibility
requirements in Part I.A. and follow the requirements for obtaining permit coverage in
Part I.D., F., or G.
A. Eligibility Requirements
For a common plan of development or sale, the phase(s) that meet the eligibility
requirements in Part I.A. may obtain coverage under this permit even if other
phase(s) of the same common plan of development or sale do not meet the
eligibility requirements and require an individual SPDES permit.
1. The owner’s or operator’s construction activities involve soil disturbances of:
a. one or more acres; or
b. less than one acre which are part of a common plan of development or
sale that will ultimately disturb one or more acres; or
c. less than one acre where NYSDEC has determined that a SPDES
permit is required for stormwater discharges based on the potential for
contribution to a violation of a water quality standard or for significant
contribution of pollutants to surface waters of the State.
i. 5,000 square feet or more, but less than one acre, and are in
the New York City Watershed located east of the Hudson River,
Appendix C Figure 1; or
ii. 20,000 square feet or more, but less than one acre, within the
municipal boundaries of the City of New York (NYC); or
iii. less than 20,000 square feet which are part of a common plan
of development or sale that will ultimately disturb 20,000 square
feet or more, but less than one acre, within the municipal
boundaries of NYC; or
iv. that creates 5,000 square feet or more of impervious area within
the municipal boundaries of NYC.
5
Page 998 of 1493
Page 999
Part I.A.2.
2. Discharges from the owner’s or operator’s construction activities are/were not:
a. already covered by a different SPDES permit; or
b. covered under a different SPDES permit that was denied, terminated,
or revoked; or
c. identified in an expired individual SPDES permit that was not renewed;
or
d. required to obtain an individual SPDES permit or another general
SPDES permit in accordance with Part VII.K.
3. If construction activities may adversely affect a species that is endangered or
threatened, the owner or operator must obtain a:
a. permit issued pursuant to 6 NYCRR Part 182 for the project; or
b. letter issued by NYSDEC of non-jurisdiction pursuant to 6 NYCRR Part
182 for the project.
4. If construction activities have the potential to affect an historic property, the
owner or operator must obtain one of the following:
a. documentation that the construction activity is not within an
archeological buffer area indicated on the sensitivity map, and that the
construction activity is not located on or immediately adjacent to a
property listed or determined to be eligible for listing on the National or
State Registers of Historic Places, and that there is no new permanent
building on the construction site within the following distances from a
building, structure, or object that is more than 50 years old, or if there
is such a new permanent building on the construction site within those
parameters that NYS Office of Parks, Recreation and Historic
Preservation (OPRHP), a Historic Preservation Commission of a
Certified Local Government, or a qualified preservation professional
has determined that the building, structure, or object more than 50
years old is not historically/archeologically significant:
i. 1-5 acres of disturbance - 20 feet; or
ii. 5-20 acres of disturbance - 50 feet; or
6
Page 999 of 1493
Page 1000
Part I.A.4.a.iii.
iii. 20+ acres of disturbance - 100 feet.
b. NYSDEC consultation form sent to OPRHP, 1 and copied to NYSDEC’s
Agency Historic Preservation Officer (APO), and
i. the State Environmental Quality Review Act (SEQR)
Environmental Assessment Form (EAF) with a negative
declaration or the Findings Statement, with documentation of
OPRHP’s agreement with the resolution; or
ii. documentation from OPRHP that the construction activity will
result in No Impact; or
iii. documentation from OPRHP providing a determination of No
Adverse Impact; or
iv. a Letter of Resolution signed by the owner or operator, OPRHP
and the DEC APO which allows for this construction activity to
be eligible for coverage under the general permit in terms of the
State Historic Preservation Act (SHPA).
c. documentation of satisfactory compliance with Section 106 of the
National Historic Preservation Act for a coterminous project area:
i. No Affect; or
ii. No Adverse Affect; or
iii. Executed Memorandum of Agreement.
d. documentation that SHPA Section 14.09 has been completed by
NYSDEC or another state agency.
5. If construction activities are subject to SEQR, the owner or operator must
obtain documentation that SEQR has been satisfied.
6. If construction activities are not subject to SEQR, but subject to the equivalent
environmental review from another New York State or federal agency, the
1
The consultation form can be submitted, along with other project information, through
OPRHP's Cultural Resource Information System (CRIS) portal. If submitted through CRIS,
paper copies of the consultation form need not be mailed.
7
Page 1000 of 1493
Page 1001
Part I.A.6.
owner or operator must obtain documentation that project review, pursuant to
a process equivalent to SEQR from another New York State or federal
agency, has been satisfied.
7. If construction activities require Uniform Procedures Act (UPA) Permits (see 6
NYCRR Part 621) from NYSDEC, or the equivalent from another New York
State or federal agency, the owner or operator must:
a. obtain all such necessary permits; or
b. receive notification from NYSDEC pursuant to 6 NYCRR 621.3(a)(4)
excepting Part I.A.7.a.
8. Construction activities are not eligible if they meet the following criteria in Part
I.A.8.a. or b.:
a. For linear transportation and linear utility project types, the construction
activities:
i. are within the watershed of surface waters of the State
classified as AA or AA-S identified utilizing the Stormwater
Interactive Map on NYSDEC’s website; and
ii. are undertaken on land with no existing impervious cover; and
iii. disturb two or more acres of steep slope.
b. For all other project types, the construction activities:
i. are within the watershed of surface waters of the State
classified as AA or AA-S identified utilizing the Stormwater
Interactive Map on NYSDEC’s website; and
ii. are undertaken on land with no existing impervious cover; and
iii. disturb one or more acres of steep slope.
8
Page 1001 of 1493
Page 1002
Part I.B.
B. Types of Discharges Authorized
1. The following stormwater discharges are authorized under this permit:
a. Stormwater discharges, including stormwater runoff, snowmelt runoff, and
surface runoff and drainage, associated with construction activity, are
authorized under this permit provided that appropriate stormwater controls
are designed, installed, and maintained in accordance with Part II. and
Part III.
b. Stormwater discharges from construction support activities at the
construction site (including concrete or asphalt batch plants, equipment
staging yards, material storage areas, excavated material disposal areas,
and borrow areas) if the following requirements are met:
i. The support activity is directly related to the construction site
required to have permit coverage for stormwater discharges; and
ii. The support activity is not a commercial operation, nor does it serve
multiple unrelated construction sites; and
iii. The support activity does not continue to operate beyond the
completion of the construction activity at the site it supports; and
iv. Stormwater controls are implemented in accordance with Part II.
and Part III. for discharges from the support activity areas.
2. The following non-stormwater discharges associated with construction activity
are authorized under this permit:
a. Non-stormwater discharges listed in 6 NYCRR 750-1.2(a)(29)(vi), with the
following exception: “Discharges from firefighting activities are authorized
only when the firefighting activities are emergencies/unplanned”; and
b. Non-stormwater discharges of waters to which other components have not
been added that are used in accordance with the SWPPP to control dust
or irrigate vegetation in stabilized areas; and
c. Uncontaminated discharges from dewatering operations
9
Page 1002 of 1493
Page 1003
Part I.B.3.
3. Authorized discharges of stormwater or authorized discharges of non-
stormwater, commingled with a discharge authorized by a different SPDES
permit and/or a discharge that does not require SPDES permit authorization,
are also authorized under this permit.
C. Prohibited Discharges
1. Non-stormwater discharges prohibited under this permit include but are not
limited to:
a. Wastewater from washout of concrete; and
b. Wastewater from washout and cleanout of stucco, paint, form release
oils, curing compounds, and other construction materials; and
c. Fuels, oils, or other pollutants used in vehicle and equipment operation
and maintenance; and
d. Soaps, solvents, or detergents used in vehicle and equipment washing
or external building washdown; and
e. Toxic or hazardous substances from a spill or other release.
D. Electronic Notice of Intent (eNOI) Submittal
To receive authorization in accordance with Part I.D.3.b., the owner or operator
must submit a complete eNOI in accordance with the requirements in Part I.D.
The eNOI contains questions to: ensure eligibility requirements in Part I.A. have
been met; obtain owner or operator contact information; obtain the total area to
be disturbed and the existing/future impervious areas (rounded to the nearest
tenth of an acre); confirm Traditional Land Use Control MS4 Operator jurisdiction
over construction projects; satisfy the EPA eRule requirements; confirm that the
Water Quality-Based Effluent Limitations in Part II. have been met; demonstrate
consideration of the future risks due to climate change in accordance with Part
III.A.2.; and confirm that the other Stormwater Pollution Prevention Plan
(SWPPP) requirements in Part III. have been met.
1. An eNOI may be submitted for:
a. construction activities that are not part of a common plan of
development or sale; or
10
Page 1003 of 1493
Page 1004
Part I.D.1.b.
b. an entire common plan of development or sale; or
c. separate phase(s) of a common plan of development or sale if the
following requirements are met:
i. the common plan of development or sale meets the eligibility
requirements of Part I.A.5. or 6.; and
ii. the phase(s) meet(s) all other eligibility requirements of Part
I.A.; and
iii. Part III.C. Required SWPPP Components by Project Type is
based on the common plan of development or sale, not the
phase(s); or
d. tree clearing that is associated with, or will support, a renewable
energy generation, transmission, or storage project that meets Part
I.A.5. and 6., if the tree clearing:
i. meets all other eligibility requirements of Part I.A.; and
ii. will occur in NYSDEC’s Regions 3-9; and
iii. is not within ¼ mile of a bat hibernaculum protected pursuant to
6 NYCRR Part 182; and
iv. will occur between November 1st and March 31st.
2. As prerequisites for submitting an eNOI, the owner or operator must:
a. prepare a SWPPP for Part I.D.1.a., b., c., or d. in accordance with Part
III.; and
b. based on the following criteria, upload the following signature forms
signed in accordance with Part VII.J. to the eNOI prior to submission:
i. for all eNOIs:
1. the SWPPP Preparer Certification Form, Appendix F,
signed by the SWPPP preparer; and
11
Page 1004 of 1493
Page 1005
Part I.D.2.b.i.2.
2. the Owner/Operator Certification Form, Appendix J,
signed by the owner or operator; and
ii. if an eNOI includes construction activities within the municipal
boundary(ies) of Traditional Land Use Control MS4 Operator(s)
that will discharge to the MS4(s):
1. determine if the Traditional Land Use Control MS4
Operator(s) have review authority. A Traditional Land
Use Control MS4 Operator does not have review
authority where:
a. the owner or operator of the construction activities
in Part I.D.2.b.ii. is the same entity as the
Traditional Land Use Control MS4 Operator
identified in Part I.D.2.b.ii.; or
b. there is a statute exempting the owner or operator
from zoning review by the Traditional Land Use
Control MS4 Operator; or
c. there is no such statute per Part I.D.2.b.ii.1.b., the
Traditional Land Use Control MS4 Operator
concludes, after public hearing, that it does not
have zoning review authority in accordance with
Legal Memorandum LU14 Updated January 2020
“Governmental Immunity from Zoning and Other
Legislation”; and
2. if the Traditional Land Use Control MS4 Operator(s) have
review authority, submit the SWPPP to the Traditional
Land Use Control MS4 Operator(s) for review and have:
a. if outside the municipal boundaries of NYC: the
MS4 SWPPP Acceptance Form, Appendix G,
signed by the principal executive officer or ranking
elected official from the Traditional Land Use
Control MS4 Operator, or by a duly authorized
representative of that person in accordance with
Part VII.J.2.; or
12
Page 1005 of 1493
Page 1006
Part I.D.2.b.ii.2.b.
b. if within the municipal boundaries of NYC: The
City of New York Department of Environmental
Protection (NYCDEP) SWPPP
Acceptance/Approval Form, Appendix H, signed
by the principal executive officer or ranking elected
official from the Traditional Land Use Control MS4
Operator, or by a duly authorized representative of
that person in accordance with Part VII.J.2.; and
3. if the Traditional Land Use Control MS4 Operator does
not have review authority, have the MS4 No Jurisdiction
Form, Appendix I, signed by the principal executive
officer or ranking elected official from the Traditional Land
Use Control MS4 Operator, or by a duly authorized
representative of that person in accordance with Part
VII.J.2.
3. Submitting an eNOI:
a. The owner or operator must submit a complete Notice of Intent
electronically using a NYSDEC approved form. 2
b. The owner or operator is authorized to commence construction activity
as of the authorization date indicated in the Letter of Authorization
(LOA), which is sent by NYSDEC after a complete eNOI is submitted.
i. If an eNOI is received for a SWPPP that deviates from one of
the technical standards but demonstrates equivalence in
accordance with Part III.B.1.a.ii. or Part III.B.2.b.ii., if the
SWPPP includes construction activities that are not within the
municipal boundary(ies) of Traditional Land Use Control MS4
Operator(s), and/or if the SWPPP includes construction
activities within the municipal boundary(ies) of Traditional Land
Use Control MS4 Operator(s) that do not have review authority
in accordance with Part I.D.2.b.ii.1., the authorization date
indicated in the LOA will be 60 business days after the eNOI
submission date.
2 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or (d). All waiver requests must
be submitted to [email protected] or NYSDEC, Bureau of Water Permits, 625 Broadway, 4th
Floor, Albany, New York 12233-3505.
13
Page 1006 of 1493
Page 1007
Part I.D.3.c.
c. If Traditional Land Use Control MS4 Operator(s) have review authority
in accordance with Part I.D.2.b.ii.2., the owner or operator must, within
five business days of receipt of the LOA, send an electronic copy of the
LOA to the Traditional Land Use Control MS4 Operator(s) with review
authority.
E. General Requirements for Owners or Operators with Permit Coverage
1. As of the date the LOA is received, the owner or operator must make the
eNOI, SWPPP, and LOA available for review and copying in accordance with
the requirements in Part VII.H. When applicable, as of the date an updated
LOA is received, the owner or operator must make the updated LOA available
for review and copying in accordance with the requirements in Part VII.H.
2. The owner or operator must ensure compliance with all requirements of this
permit and that the provisions of the SWPPP, including any changes made to
the SWPPP in accordance with Part III.A.5., are properly implemented and
maintained from the commencement of construction activity until:
a. all areas of disturbance have achieved final stabilization; and
b. the owner’s or operator’s coverage under this permit is terminated in
accordance with Part V.A.5.a.
3. As of the date of the commencement of construction activities until Part
I.E.2.a. and b. have been met, the owner or operator must maintain at the
construction site, a copy of:
a. all documentation necessary to demonstrate eligibility with this permit; and
b. this permit; and
c. the SWPPP; and
d. the signed SWPPP Preparer Certification Form; and
e. the signed MS4 SWPPP Acceptance Form or signed NYCDEP SWPPP
Acceptance/Approval Form or signed MS4 No Jurisdiction Form (when
applicable); and
f. the signed Owner/Operator Certification Form; and
14
Page 1007 of 1493
Page 1008
Part I.E.3.g.
g. the eNOI; and
h. the LOA; and
i. the LOA transmittal to the Traditional Land Use Control MS4 Operator in
accordance with Part I.D.3.c. (when applicable).
4. The owner or operator must maintain at the construction site, until Part
I.E.2.a. and b. have been met, as of the date the documents become final or
are received, a copy of the:
a. responsible contractor’s or subcontractor’s certification statement(s) in
accordance with Part III.A.7.; and
b. inspection reports in accordance with Part IV.C.4. and 6.; and
c. Request to Disturb Greater Than Five Acres and the Authorization Letter
to Disturb Greater Than Five Acres in accordance with Part I.E.6. (when
applicable); and
d. Request to Continue Coverage and the Letter of Continued Coverage
(LOCC) in accordance with Part I.F.2. and 4. (when applicable); and
e. The updated LOA(s) in accordance with Part I.E.9. (when applicable).
5. The owner or operator must maintain the documents in Part I.E.3. and 4. in a
secure location, such as a job trailer, on-site construction office, or mailbox
with lock. The secure location must be accessible during normal business
hours to an individual performing a compliance inspection. The documents
must be paper documents unless electronic documents are accessible to the
inspector during an inspection to the same extent as a paper copy stored at
the site would be. If electronic documents are kept on site, the owner or
operator must maintain functional equipment on site available to an inspector
during normal hours of operation such that an inspector may view the
electronic documents in a format that can be read in a similar manner as a
paper record and in a legally dependable format with no less evidentiary
value than their paper equivalent.
6. The owner or operator must meet the following requirements prior to
disturbing greater than five acres of soil at any one time:
a. The owner or operator must submit a written Request to Disturb Greater
Than Five Acres to:
15
Page 1008 of 1493
Page 1009
Part I.E.6.a.i.
i. NYSDEC’s Regional Office Division of Water staff based on the
project location, Appendix E, if a Traditional Land Use Control MS4
Operator does not have review authority in accordance with Part
I.D.2.b.ii.1.; or
ii. the Traditional Land Use Control MS4 Operator, if a Traditional
Land Use Control MS4 Operator has review authority in
accordance with Part I.D.2.b.ii.1.; or
iii. NYSDEC’s Regional Office Division of Water staff based on the
project location, Appendix E, and each involved Traditional Land
Use Control MS4 Operator, if the project spans multiple
municipalities with more than one Traditional Land Use Control
MS4 Operator involved with review authority in accordance with
Part I.D.2.b.ii.1.
b. The written Request to Disturb Greater Than Five Acres must include:
i. The SPDES permit identification number (Permit ID); and
ii. Full technical justification demonstrating why alternative methods of
construction that would result in five acres of soil disturbance or
less at any one time are not feasible; and
iii. The phasing plan for the project and sequencing plans for all
phases from the SWPPP in accordance with Part III.B.1.d.; and
iv. Plans with locations and details of erosion and sediment control
practices such that the heightened concern for erosion when
disturbing greater than five acres at one time has been addressed;
and
v. Acknowledgment that “the owner or operator will comply with the
requirements in Part IV.C.2.b.”; and
vi. Acknowledgment that “the owner or operator will comply with the
requirements in Part II.B.1.b.”
c. The owner or operator must be in receipt of an Authorization Letter to
Disturb Greater Than Five Acres, which will include when the
16
Page 1009 of 1493
Page 1010
Part I.E.6.c.
authorization begins and ends and indicate a maximum area (acres) of
soil disturbance allowed at any one time, from:
i. NYSDEC, if Part I.E.6.a.i. or iii. apply; or
ii. the Traditional Land Use Control MS4 Operator, if Part I.E.6.a.ii.
applies.
7. Upon a finding of significant non-compliance with the practices described in
the SWPPP or violation of this permit, NYSDEC may order an immediate stop
to all construction activity at the site until the non-compliance is remedied.
The stop work order must be in writing, describe the non-compliance in detail,
and be sent to the owner or operator.
8. If any human remains or archaeological remains are encountered during
excavation, the owner or operator must immediately cease, or cause to
cease, all construction activity in the area of the remains and notify the
appropriate Regional Water Engineer (RWE). 3 Construction activity shall not
resume until written permission to do so has been received from the RWE.
9. To be authorized to implement modifications to the information previously
submitted in the eNOI, the owner or operator must:
a. notify NYSDEC via email at [email protected] requesting
access to update the eNOI; and
b. update the eNOI to reflect the modifications and resubmit the eNOI in
accordance with Part I.D.; and
c. receive an updated LOA.
10. The eNOI, SWPPP, LOA, updated LOAs (when applicable), and inspection
reports required by this permit are public documents that the owner or
operator must make available for review and copying by any person within
five business days of the owner or operator receiving a written request by any
such person to review these documents. Copying of documents will be done
at the requester’s expense.
3 The Regional Water Manager where a DEC Region does not have a RWE.
17
Page 1010 of 1493
Page 1011
Part I.F.
F. Permit Coverage for Discharges Authorized Under GP-0-20-001
When applicable:
1. Upon the effective date of this permit, an owner or operator of a construction
activity, with coverage under GP-0-20-001, will have interim coverage under
GP-0-25-001 for 45 calendar days starting on the effective date of GP-0-25-
001 so long as the owner or operator maintains compliance with all applicable
requirements of this permit.
2. Within 30 calendar days of the effective date of this permit, the owner or
operator, with coverage under GP-0-20-001, must submit a complete Request
to Continue Coverage electronically using a NYSDEC approved form, 4 which
contains the information identified in Part I.F.3. below, if:
a. the owner or operator continues to implement the SMP component in
conformance with the technical standards in place at the time of initial
project authorization; and
b. the owner or operator will comply with all non-design requirements of GP-
0-25-001.
3. The Request to Continue Coverage form contains questions to: ensure
eligibility requirements in Part I.A. have been met; verify owner or operator
contact information; verify the permit identification number; verify the original
eNOI submission ID, if applicable; verify Part I.F.2.a. and b.; verify the version
of the Design Manual that the technical/design components conform to; and
receive an updated Owner/Operator Certification Form, Appendix I.
4. The owner or operator has obtained continued coverage under GP-0-25-001
as of the date indicated in the LOCC, which is sent by NYSDEC after a
complete Request to Continue Coverage form is submitted.
5. If the owner or operator does not submit the Request to Continue Coverage
form in accordance with Part I.F.2. and 3., coverage under this permit is
automatically terminated after interim coverage expires.
4 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or (d). All waiver requests must
be submitted to [email protected] or NYSDEC, Bureau of Water Permits, 625 Broadway, 4th
Floor, Albany, New York 12233-3505.
18
Page 1011 of 1493
Page 1012
Part I.G.
G. Change of Owner or Operator
When applicable:
1. When property ownership changes, or when there is a change in operational
control over the construction plans and specifications, the following process
applies:
a. The new owner or operator must meet the applicable prerequisites for
submitting an eNOI in accordance with Part I.D.2.; and
b. The new owner or operator must submit an eNOI in accordance with Part
I.D.3.; and
c. Permit coverage for the new owner or operator will be effective upon
receipt of the LOA in accordance with Part I.D.3.b.; and
d. The new owner or operator, upon receipt of their LOA, must provide their
Permit ID to the original owner or operator; and
e. If the original owner or operator will no longer be the owner or operator of
the construction activity identified in the original owner’s or operator’s
eNOI, the original owner or operator, upon receipt of the new owner’s or
operator’s Permit ID in accordance with Part I.G.1.d., must submit to
NYSDEC a completed eNOT in accordance with Part V. that includes the
name and Permit ID of the new owner or operator; or
f. If the original owner or operator maintains ownership of a portion of the
construction activity, the original owner or operator must maintain their
coverage under the permit by modifying their eNOI; modifications to the
eNOI must include:
i. the revised area of disturbance and/or impervious area(s); and
ii. the revised SMP information, if applicable; and
iii. a narrative description of what has changed; and
iv. the new owner’s or operator’s Permit ID for the portion of the
project removed from the eNOI.
Owners or operators must follow Part I.E.9. to modify the eNOI.
19
Page 1012 of 1493
Page 1013
Part II.
Part II. Water Quality-Based Effluent Limitations
A. Maintaining Water Quality
NYSDEC expects that compliance with the requirements of this permit will control
discharges necessary to meet applicable water quality standards. It shall be a
violation of the ECL for any discharge to either cause or contribute to a violation
of the following water quality standards as contained in Parts 700 through 705 of
Title 6 of the Official Compilation of Codes, Rules and Regulations of the State of
New York:
1. There must be no increase in turbidity that will cause a substantial visible
contrast to natural conditions; and
2. There must be no increase in suspended, colloidal or settleable solids that will
cause deposition or impair the waters for their best usages; and
3. There must be no residue from oil and floating substances, nor visible oil film,
nor globules of grease.
If there is evidence indicating that the stormwater discharges authorized by this
permit are causing, have the reasonable potential to cause, or are contributing to
a violation of the water quality standard, the owner or operator must take
appropriate corrective action in accordance with Part IV.C.5. of this permit and
document in accordance with Part IV.C.4. of this permit. To address the water
quality standard violation the owner or operator must include and implement
appropriate controls in the SWPPP to correct the problem or obtain an individual
SPDES permit.
If, despite compliance with the requirements of this permit, it is demonstrated that
the stormwater discharges authorized by this permit are causing or contributing
to a violation of water quality standards, or if NYSDEC determines that a
modification of this permit is necessary to prevent a violation of water quality
standards, the authorized discharges will no longer be eligible for coverage under
this permit, and the owner or operator must obtain an individual SPDES permit
prior to further discharges from the construction site.
B. Effluent Limitations Applicable to Discharges from Construction Activities
Discharges authorized by this permit must achieve, at a minimum, the effluent
limitations in Part II.B.1.a., b., c., d., and e. These limitations represent the
20
Page 1013 of 1493
Page 1014
Part II.B.
degree of effluent reduction attainable by the application of best practicable
technology currently available.
1. Erosion and Sediment Control Requirements - The owner or operator must
select, design, install, implement, and maintain control measures to minimize
the discharge of pollutants and prevent a violation of the water quality
standards. The selection, design, installation, implementation, and
maintenance of these control measures must meet the non-numeric effluent
limitations in Part II.B.1.a., b., c., d., and e. and be in accordance with the
New York State Standards and Specifications for Erosion and Sediment
Control (BB), dated November 2016, using sound engineering judgment.
Where control measures are not designed in conformance with the design
criteria included in the technical standard, the owner or operator must include
in SWPPP the reason(s) for the deviation, or alternative design, and provide
information in the SWPPP demonstrating that the deviation or alternative
design is equivalent to the technical standard.
a. Erosion and Sediment Controls. At a minimum, erosion and sediment
controls must be selected, designed, installed, implemented, and
maintained to:
i. Minimize soil erosion through application of runoff control and soil
stabilization control measure to minimize pollutant discharges; and
ii. Control stormwater discharges, including both peak flow rates and
total stormwater volume, to minimize channel and streambank
erosion and scour in the immediate vicinity of the discharge points;
and
iii. Minimize the amount of soil exposed during construction activity;
and
iv. Minimize the disturbance of steep slope; and
v. Minimize sediment discharges from the site; and
vi. Provide and maintain natural buffers around surface waters, direct
stormwater to vegetated areas and maximize stormwater infiltration
to reduce pollutant discharges, unless infeasible; and
vii. Minimize soil compaction. Minimizing soil compaction is not required
21
Page 1014 of 1493
Page 1015
Part II.B.1.a.vii.
where the intended function of a specific area of the site dictates that
it be compacted; and
viii. Unless infeasible, preserve a sufficient amount of topsoil to complete
soil restoration and establish a uniform, dense vegetative cover; and
ix. Minimize dust. On areas of exposed soil, minimize dust through the
appropriate application of water or other dust suppression techniques
to control the generation of pollutants that could be discharged from
the site.
b. Soil Stabilization. In areas where soil disturbance activity has ceased,
whether permanently or temporarily ceased, the application of soil
stabilization measures must be initiated by the end of the next business
day and completed within 14 calendar days from the date the current soil
disturbance activity ceased. For construction sites that directly discharge
to one of the 303(d) segments listed in Appendix D, or are located in one
of the watersheds listed in Appendix C, or are authorized to disturb greater
than five acres in accordance with Part I.E.5.a.viii., the application of soil
stabilization measures must be initiated by the end of the next business
day and completed within seven calendar days from the date the soil
disturbance activity ceased.
c. Dewatering. Discharges from dewatering activities, including discharges
from dewatering of trenches and excavations, must be managed by
appropriate control measures.
d. Pollution Prevention Measures. Select, design, install, implement, and
maintain effective pollution prevention measures to minimize the
discharge of pollutants and prevent a violation of the water quality
standards. At a minimum, such measures must be selected, designed,
installed, implemented, and maintained to:
i. Minimize the discharge of pollutants from equipment and vehicle
washing, wheel wash water, and other wash waters. Soaps,
detergents and solvents cannot be used; and
ii. Minimize the exposure of building materials, building products,
construction wastes, trash, landscape materials, fertilizers,
pesticides, herbicides, detergents, sanitary waste, hazardous and
toxic waste, and other materials present on the site to precipitation
22
Page 1015 of 1493
Page 1016
Part II.B.1.d.ii.
and to stormwater. Minimization of exposure is not required in
cases where the exposure to precipitation and to stormwater will
not result in a discharge of pollutants, or where exposure of a
specific material or product poses little risk of stormwater
contamination (such as final products and materials intended for
outdoor use); and
iii. Prevent the discharge of pollutants from spills and leaks and
implement chemical spill and leak prevention and response
procedures.
e. Surface Outlets. When discharging from basins and impoundments, the
surface outlets must be designed, constructed, and maintained in such a
manner that sediment does not leave the basin or impoundment and that
erosion at or below the outlet does not occur.
C. Post-Construction Stormwater Management Practice (SMP) Requirements
1. The owner or operator of a construction activity that requires post-
construction SMPs, in accordance with Part III.C., must select, design, install,
implement, and maintain the SMPs to meet the performance criteria in the
New York State Stormwater Management Design Manual, dated July 31,
2024 (DM), using sound engineering judgment. Where SMPs are not
designed in conformance with the performance criteria in the DM, the owner
or operator must include in the SWPPP the reason(s) for the deviation or
alternative design and provide information which demonstrates that the
deviation or alternative design is equivalent to the technical standard.
2. The owner or operator of a construction activity, that requires SMPs in
accordance with Part III.C., must design the practices to meet the applicable
sizing criteria in Part II.C.2.a., b., c., or d.
a. Sizing Criteria for New Development
i. Runoff Reduction Volume (RRv) and Water Quality Volume (WQv):
1. Reduce the total WQv by application of RR techniques and
standard SMPs with RRv capacity. The total WQv must be
calculated in accordance with the criteria in Section 4.2 of
the DM; or
23
Page 1016 of 1493
Page 1017
Part II.C.2.a.i.2.
2. Minimum RRv and Treatment of Remaining Total WQv:
Construction activities that cannot meet the requirements in
Part II.C.2.a.i.1. due to site limitations must direct runoff from
all newly constructed impervious areas to a RR technique or
standard SMP with RRv capacity unless infeasible. The
specific site limitations that prevent the reduction of 100% of
the WQv must be documented in the SWPPP. For each
impervious area that is not directed to a RR technique or
standard SMP with RRv capacity, the SWPPP must include
documentation which demonstrates that all options were
considered and for each option explains why it is considered
infeasible.
In no case shall the runoff reduction achieved from the
newly constructed impervious areas be less than the
Minimum RRv as calculated using the criteria in Section
4.4 of the DM. The remaining portion of the total WQv that
cannot be reduced must be treated by application of
standard SMPs.
ii. Channel Protection Volume (CPv): Provide 24 hour extended
detention of the post-developed 1-year, 24-hour storm event,
remaining after runoff reduction. Where a CPv control orifice is
provided, the minimum orifice size must be 3 inches, with
acceptable external trash rack or orifice protection. The CPv
requirement does not apply when:
1. Reduction of the entire CPv is achieved by application of
runoff reduction techniques or infiltration systems; or
2. The 1-year post-development peak discharge is less than or
equal to 2.0 cfs without detention or velocity controls; or
3. The site directly discharges into a fifth order or larger water
body (stream, river, or lake), or tidal waters, where the
increase in smaller flows will not impact the stream bank or
channel integrity. However, the point of discharge must be
adequately protected against scour and erosion by the
increased peak discharge.
24
Page 1017 of 1493
Page 1018
Part II.C.2.a.iii.
iii. Overbank Flood Control Criteria (Qp): Requires storage to
attenuate the post-development 10-year, 24-hour peak discharge
rate (Qp) to predevelopment rates. The Qp requirement does not
apply when:
1. the site directly discharges to tidal waters or fifth order or
larger streams, or
2. A downstream analysis reveals that overbank control is not
required.
iv. Extreme Flood Control Criteria (Qf): Requires storage to attenuate
the post-development 100-year, 24-hour peak discharge rate (Qf)
to predevelopment rates. The Qf requirement does not apply when:
1. the site directly discharges to tidal waters or fifth order or
larger streams, or
2. A downstream analysis reveals that overbank control is not
required.
b. Sizing Criteria for New Development in Enhanced Phosphorus
Removal Watersheds
i. Runoff Reduction Volume (RRv) and Water Quality Volume (WQv):
1. Reduce the WQv by application of RR techniques and
standard SMPs with RRv capacity. The total WQv is the
runoff volume from the 1-year, 24-hour design storm over
the post-developed watershed and must be calculated in
accordance with the criteria in Section 4.3 of the DM; or
2. Minimum RRv and Treatment of Remaining Total WQv:
Construction activities that cannot meet the criteria in Part
II.C.2.b.i.1. due to site limitations must direct runoff from all
newly constructed impervious areas to a RR technique or
standard SMP with RRv capacity unless infeasible. The
specific site limitations that prevent the reduction of 100% of
the WQv must be documented in the SWPPP. For each
impervious area that is not directed to a RR technique or
standard SMP with RRv capacity, the SWPPP must include
25
Page 1018 of 1493
Page 1019
Part II.C.2.b.i.2.
documentation which demonstrates that all options were
considered and for each option explains why it is considered
infeasible.
In no case shall the runoff reduction achieved from the
newly constructed impervious areas be less than the
Minimum RRv as calculated using the criteria in Section
4.5 of the DM. The remaining portion of the total WQv that
cannot be reduced must be treated by application of
standard SMPs.
ii. Channel Protection Volume (CPv): Provide 24 hour extended
detention of the post-developed 1-year, 24-hour storm event,
remaining after runoff reduction. Where a CPv control orifice is
provided, the minimum orifice size must be 3 inches, with
acceptable external trash rack or orifice protection. The CPv
requirement does not apply when:
1. Reduction of the entire CPv is achieved by application of
runoff reduction techniques or infiltration systems; or
2. The 1-year post-development peak discharge is less than or
equal to 2.0 cfs; or
3. The site directly discharges to tidal waters, or a fifth order or
larger water body (stream, river, or lake) where the increase
in smaller flows will not impact the stream bank or channel
integrity. However, the point of discharge must be
adequately protected against scour and erosion by the
increased peak discharge.
iii. Overbank Flood Control Criteria (Qp): Requires storage to
attenuate the post-development 10-year, 24-hour peak discharge
rate (Qp) to predevelopment rates. The Qp requirement does not
apply when:
1. the site directly discharges to tidal waters or fifth order or
larger streams; or
2. A downstream analysis reveals that overbank control is not
required.
26
Page 1019 of 1493
Page 1020
Part II.C.2.b.iv.
iv. Extreme Flood Control Criteria (Qf): Requires storage to attenuate
the post-development 100-year, 24-hour peak discharge rate (Qf)
to predevelopment rates. The Qf requirement does not apply when:
1. the site directly discharges to tidal waters or fifth order or
larger streams; or
2. A downstream analysis reveals that overbank control is not
required.
c. Sizing Criteria for Redevelopment Activity
i. Water Quality Volume (WQv): The WQv treatment objective for
redevelopment activity must be addressed by one of the following
options, as outlined in Section 9.2.1. Redevelopment activities
located in an Enhanced Phosphorus Removal Watershed (see Part
III.B.3. and Appendix C) must calculate the WQv in accordance
with Section 4.3 of the DM. All other redevelopment activities must
calculate the WQv in accordance with Section 4.2 of the DM.
1. Reduce the existing impervious cover by a minimum of 25%
of the total disturbed, impervious area. The Soil Restoration
criteria in Section 5.1.6 of the DM must be applied to all
newly created pervious areas; or
2. Capture and treat 100% of the required WQv, for a minimum
of 25% of the disturbed redevelopment impervious area, by
implementation of standard SMPs or reduced by application
of runoff reduction techniques; or
3. Capture and treat 100% of the required WQv, for a minimum
of 75% of the disturbed redevelopment impervious area, by
implementation of a volume-based alternative SMP, as
defined in Section 9.4 of the DM; or
4. Capture and treat 100% of the required WQv, for a minimum
of 75% of the disturbed redevelopment impervious area, by
implementation of a flow-through alternative SMP sized to
treat the peak rate of runoff from the WQv design storm; or
27
Page 1020 of 1493
Page 1021
Part II.C.2.c.i.5.
5. Application of a combination of 1 through 4 above that
provide a weighted average of at least two of the above
methods. Application of this method must be in accordance
with the criteria in Section 9.2.1(A)(V) of the DM; or
6. If there is an existing SMP located on the site that captures
and treats runoff from the impervious area that is being
disturbed, the WQv treatment option selected must, at a
minimum, provide treatment equal to the treatment that was
being provided by the existing practice(s) if that treatment is
greater than the treatment required by options 1 through 5
above.
ii. Channel Protection Volume (CPv) is not required if there is 0%
change to hydrology that increases the discharge rate and volume
from the project site.
iii. Overbank Flood Control (Qp) is not required if there is 0% change
to hydrology that increases the discharge rate from the project site.
iv. Extreme Flood Control (Qf) is not required if there is 0% change to
hydrology that increases the discharge rate from the project site.
d. Sizing Criteria for Combination of Redevelopment Activity and New
Development
Construction projects, that include both new development and redevelopment
activity, must use SMPs that meet the sizing criteria calculated as an
aggregate of the sizing criteria in Part II.C.2.a. or b. for the new development
portion of the project and Part II.C.2.c. for the redevelopment activity portion
of the project.
Part III. Stormwater Pollution Prevention Plan (SWPPP)
A. General SWPPP Requirements
1. A SWPPP must be prepared and implemented by the owner or operator of all
construction activity covered by this permit. All authorized discharges must be
identified in the SWPPP. The SWPPP must document the selection, design,
installation, implementation and maintenance of the control measures and
28
Page 1021 of 1493
Page 1022
Part III.A.1.
practices that will be used to meet the effluent limitations in Part II.B. and,
where applicable, the SMP requirements in Part II.C.
2. The SWPPP must demonstrate consideration in narrative format of the future
physical risks due to climate change pursuant to the Community Risk and
Resiliency Act (CRRA), 6 NYCRR Part 490, and associated guidance.
a. The owner or operator must consider:
i. the following physical risks due to climate change:
(i) increasing temperature; and
(ii) increasing precipitation; and
(iii) increasing variability in precipitation, including chance of
drought; and
(iv) increasing frequency and severity of flooding; and
(v) rising sea level; and
(vi) increasing storm surge; and
(vii) shifting ecology.
ii. for each of the following:
(i) overall site planning; and
(ii) location, elevation, and sizing of:
a. control measures and practices; and
b. conveyance system(s); and
c. detention system(s).
3. The SWPPP must describe the erosion and sediment control practices and
where required, SMPs that will be used and/or constructed to reduce the
pollutants in stormwater discharges and to assure compliance with the
29
Page 1022 of 1493
Page 1023
Part III.A.3.
requirements of this permit. In addition, the SWPPP must identify potential
sources of pollution which may reasonably be expected to affect the quality of
stormwater discharges.
4. All SWPPPs, that require the SMP component in accordance with Part
III.B.2., must be prepared by a qualified professional.
5. The owner or operator must keep the SWPPP current so that, at all times, it
accurately documents the erosion and sediment control practices that are
being used or will be used during construction, and all SMPs that will be
constructed on the site. At a minimum, the owner or operator must modify the
SWPPP, including construction drawings:
a. whenever the current provisions prove to be ineffective in minimizing
pollutants in stormwater discharges from the site; and
b. whenever there is a change in design, construction, or operation at the
construction site that has or could have an effect on the discharge of
pollutants; and
c. to address issues or deficiencies identified during an inspection by the
qualified inspector, NYSDEC, or other regulatory authority; and
d. to document the final construction conditions in an as-built drawing.
6. NYSDEC may notify the owner or operator at any time that the SWPPP does
not meet one or more of the minimum requirements of this permit. The
notification must be in writing and identify the provisions of the SWPPP that
require modification. Within fourteen (14) calendar days of such notification,
or as otherwise indicated by NYSDEC, the owner or operator must make the
required changes to the SWPPP and submit written notification to NYSDEC
that the changes have been made. If the owner or operator does not respond
to NYSDEC’s comments in the specified time frame, NYSDEC may suspend
the owner’s or operator’s coverage under this permit or require the owner or
operator to obtain coverage under an individual SPDES permit in accordance
with Part II.D.4.
7. Prior to the commencement of construction activity, the owner or operator
must identify the contractor(s) and subcontractor(s) that will be responsible for
installing, constructing, repairing, replacing, inspecting, and maintaining the
erosion and sediment control practices included in the SWPPP and the
30
Page 1023 of 1493
Page 1024
Part III.A.7.
contractor(s) and subcontractor(s) that will be responsible for constructing the
SMPs included in the SWPPP. The owner or operator must have each of the
contractors and subcontractors identify at least one person from their
company to be trained contractor that will be responsible for implementation
of the SWPPP. The owner or operator must ensure that at least one trained
contractor is on site daily when soil disturbance activities are being
performed.
The owner or operator must have each of the contractors and subcontractors
identified above sign a copy of the following certification statement below
before the commencement of construction activities:
"I hereby certify under penalty of law that I understand and agree to
comply with the requirements of the SWPPP and agree to implement any
corrective actions identified by the qualified inspector during a site
inspection. I also understand that the owner or operator must comply with
the requirements of the most current version of the New York State
Pollutant Discharge Elimination System (SPDES) Construction General
Permit (CGP) for Stormwater Discharges from Construction Activities and
that it is unlawful for any person to cause or contribute to a violation of
water quality standards. Furthermore, I am aware that there are significant
penalties for submitting false information, that I do not believe to be true,
including the possibility of fine and imprisonment for knowing violations"
In addition to providing the certification statement above, the certification
page must also identify the specific elements of the SWPPP that each
contractor and subcontractor will be responsible for and include the name and
title of the person providing the signature; the name and title of the trained
contractor responsible for SWPPP implementation; the name, address and
telephone number of the contracting firm; the address (or other identifying
description) of the site; and the date the certification statement is signed. The
owner or operator must attach the certification statement(s) to the copy of the
SWPPP that is maintained at the construction site. If new or additional
contractors are hired to implement measures identified in the SWPPP after
the commencement of construction activities, they must also sign the
certification statement and provide the information listed above prior to
performing construction activities.
31
Page 1024 of 1493
Page 1025
Part III.B.
B. Required SWPPP Contents
1. Erosion and sediment control component - The owner or operator must
prepare a SWPPP that includes erosion and sediment control practices.
a. Erosion and sediment control practices must be designed:
i. in conformance with the BB; or
ii. equivalent to the BB if deviating from Part III.B.1.a.i.
b. If the erosion and sediment control practices are designed in conformance
with Part III.B.1.a.ii., the SWPPP must include a demonstration of
equivalence to the BB.
c. At a minimum, the erosion and sediment control component of the
SWPPP must include the following:
i. Background information about the scope of the project, including
the location, type and size of project; and
ii. A site map/construction drawing(s) with north arrows for the project,
including a general location map. At a minimum, the site map must
show the total site area; all improvements; areas of disturbance;
areas that will not be disturbed; existing vegetation; on-site and
adjacent off-site surface water(s); floodplain/floodway boundaries;
wetlands and drainage patterns that could be affected by the
construction activity; existing and final contours; locations of
different soil types with boundaries; material, waste, borrow or
equipment storage areas located on adjacent properties; and
location(s) of the stormwater discharge(s) and receiving surface
water(s); and
iii. A description of the soil(s) present at the site, including an
identification of the Hydrologic Soil Group (HSG); and
iv. A phasing plan for the project and sequencing plans for all phases,
both of which must address clearing and grubbing, excavation and
grading, utility and infrastructure installation, final stabilization,
32
Page 1025 of 1493
Page 1026
Part III.B.1.c.iv.
and any other construction activity at the site that will result in soil
disturbance.
1. The phasing plan must include:
a. a map delineating and labeling the limits of soil
disturbance for all phases of a project; and
b. a table identifying the order and intended schedule of
when each phase will begin and end its sequencing
plan. The table must identify the total disturbed area
for each phase at any one time and the total disturbed
area for the overall project at any one time all on one
timeline showing all overlapping quantities of
disturbed area at any one time; and
2. A sequencing plan for a specific phase must include:
a. a table indicating the order and intended schedule of
construction activities within a phase, and
corresponding construction drawings with a
description of the work to be performed; and
b. all permanent and temporary stabilization measures;
and
v. A description of the minimum erosion and sediment control
practices to be installed or implemented for each construction
activity that will result in soil disturbance. Include a schedule that
identifies the timing of initial placement or implementation of each
erosion and sediment control practice and the minimum time
frames that each practice should remain in place or be
implemented; and
vi. A site map/construction drawing(s) showing the specific location(s),
size(s), and length(s) of each erosion and sediment control
practice; and
vii. The dimensions, material specifications, installation details, and
operation and maintenance requirements for all erosion and
sediment control practices. Include the location and sizing of any
33
Page 1026 of 1493
Page 1027
Part III.B.1.c.vii.
temporary sediment basins and structural practices that will be
used to divert flows from exposed soils; and
viii. A maintenance inspection schedule for the contractor(s) and
subcontractor(s) identified in Part III.A.7. to ensure continuous and
effective operation of the erosion and sediment control practices.
The maintenance inspection schedule must be in accordance with
the requirements in the BB technical standard; and
ix. A description of the pollution prevention measures that will be used
to control litter, construction chemicals and construction debris from
becoming a pollutant source in the stormwater discharges; and
x. A description and location of any stormwater discharges associated
with industrial activity other than construction at the site, including,
but not limited to, stormwater discharges from asphalt plants and
concrete plants located on the construction site; and
xi. Identification of any elements of the design that are not in
conformance with the design criteria in the BB technical standard.
Include the reason for the deviation or alternative design and
provide information which demonstrates that the deviation or
alternative design is equivalent to the technical standard.
2. SMP component – The owner or operator of construction activity identified in
Table 2 of Appendix B must prepare a SWPPP that includes SMPs.
a. SMPs must be designed in conformance with the applicable sizing criteria
in Part II.C.2.a., c., or d.; and
b. SMPs must be designed in conformance with the performance criteria:
i. in the DM; or
ii. equivalent to the DM if deviating from Part III.B.2.b.i.; or
iii. in the New York State Stormwater Management Design Manual,
dated January 2015 (2015 Design Manual), or equivalent to it, if the
following criteria are met:
34
Page 1027 of 1493
Page 1028
Part III.B.2.b.iii.1.
1. The eNOI is submitted in accordance with Part I.D. before
January 29, 2027 for construction activities that are either:
a. subject to governmental review and approval:
i. where the owner or operator made any
application to that governmental entity prior to
the effective date of this permit; and
ii. such application included a SWPPP developed
using the 2015 Design Manual or equivalent to
it; or
b. not subject to governmental review and approval:
i. where a fiscal allocation for the construction
activities has been developed and approved by
a governmental entity; and
ii. the SWPPP was developed using the 2015
Design Manual or equivalent to it; and
c. If SMPs are designed in conformance with Part III.B.2.b.ii., the SWPPP
must include the reason(s) for the deviation or alternative design and a
demonstration of equivalence to the DM; and
d. If SMPs are designed in conformance with Part III.B.2.b.iii., the SWPPP
must include supporting information or documentation demonstrating that
Part III.B.2.b.iii.1.a. or b. apply; and
e. The SMP component of the SWPPP must include the following:
i. Identification of all SMPs to be constructed as part of the project,
including which option the SMP designs conform to, either Part
III.B.2.b.i., ii., or iii. Include the dimensions, material specifications
and installation details for each SMP; and
ii. A site map/construction drawing(s) showing the specific location
and size of each SMP; and
35
Page 1028 of 1493
Page 1029
Part III.B.2.e.iii.
iii. A Stormwater Modeling and Analysis Report that includes:
(i) Map(s) showing pre-development conditions, including
watershed/subcatchments boundaries, flow
paths/routing, and design points; and
(ii) Map(s) showing post-development conditions, including
watershed/subcatchments boundaries, flow
paths/routing, design points and SMPs; and
(iii) Results of stormwater modeling (i.e. hydrology and
hydraulic analysis) for the required storm events. Include
supporting calculations (model runs), methodology, and a
summary table that compares pre- and post-development
runoff rates and volumes for the different storm events;
and
(iv) Summary table, with supporting calculations, which
demonstrates that each SMP has been designed in
conformance with the sizing criteria included in the DM;
and
(v) Identification of any sizing criteria that is not required
based on the requirements included in Part II.C.; and
(vi) Identification of any elements of the design that are not in
conformance with the performance criteria in the DM.
Include the reason(s) for the deviation or alternative
design and provide information which demonstrates that
the deviation or alternative design is equivalent to the
DM.
iv. Soil testing results and locations (test pits, borings); and
v. Infiltration test results, when required in accordance with Part
III.B.2.a.; and
vi. An operations and maintenance plan that includes inspection and
maintenance schedules and actions to ensure continuous and
effective operation of each SMP. The plan must identify the entity
36
Page 1029 of 1493
Page 1030
Part III.B.2.e.vi.
that will be responsible for the long-term operation and
maintenance of each practice; and
3. Enhanced Phosphorus Removal Standards - The owner or operator of
construction activity identified in Table 2 of Appendix B that is located in a
watershed identified in Appendix C must prepare a SWPPP that includes
SMPs designed in conformance with the applicable sizing criteria in Part
II.C.2.b., c., or d. and the performance criteria Enhanced Phosphorus
Removal Standards included in the DM. At a minimum, the SMP component
of the SWPPP must meet the requirements of Part III.B.2.
C. Required SWPPP Components by Project Type
Owners or operators of construction activities, identified in Table 1 of Appendix
B, are required to prepare a SWPPP that only includes erosion and sediment
control practices designed in accordance with Part III.B.1. Owners or operators of
the construction activities, identified in Table 2 of Appendix B, must prepare a
SWPPP that also includes SMPs designed in accordance with Part III.B.2 or 3.
For the entire area of disturbance, including the entire common plan of
development or sale if applicable, the owner or operator must evaluate every
bullet from Appendix B Table 1 and Table 2 separately. If bullets from both Table
1 and Table 2 apply, the SWPPP must include erosion and sediment control
practices for all construction activities but SMPs for only those portions of the
construction activities that fall under Table 2 bullet(s).
Part IV. Inspection and Maintenance Requirements
A. General Construction Site Inspection and Maintenance Requirements
1. The owner or operator must ensure that all erosion and sediment control
practices (including pollution prevention measures), and all SMPs identified in
the SWPPP, are inspected and maintained in accordance with Part IV.B. and
C.
B. Contractor Maintenance Inspection Requirements
1. The owner or operator of each construction activity, identified in Tables 1 and
2 of Appendix B, must have a trained contractor inspect the erosion and
sediment control practices and pollution prevention measures being
37
Page 1030 of 1493
Page 1031
Part IV.B.1.
implemented within the active work area daily to ensure that they are being
maintained in effective operating condition at all times. If deficiencies are
identified, the contractor must:
a. if the corrective action does not require engineering design:
i. begin implementing corrective actions within one business day; and
ii. complete the corrective actions within five business days; or
b. if the corrective action requires engineering design:
i. begin the engineering design process within five business days;
and
ii. complete the corrective action in a reasonable time frame but no
later than within 60 calendar days.
2. For construction sites where soil disturbance activities have been temporarily
suspended (e.g. winter shutdown) and temporary stabilization measures have
been applied to all disturbed areas, the trained contractor can stop conducting
the maintenance inspections in accordance with Part IV.B.1. The trained
contractor must begin conducting the maintenance inspections in accordance
with Part IV.B.1. as soon as soil disturbance activities resume.
3. For construction sites where soil disturbance activities have been shut down
with partial project completion, the trained contractor can stop conducting the
maintenance inspections in accordance with Part IV.B.1. if all areas disturbed
as of the project shutdown date have achieved final stabilization and all SMPs
required for the completed portion of the project have been constructed in
conformance with the SWPPP and are operational.
C. Qualified Inspector Inspection Requirements
1. With the exception of the following construction activities identified in Tables 1
and 2 of Appendix B, a qualified inspector must conduct site inspections for
all other construction activities identified in Tables 1 and 2 of Appendix B:
a. the construction of a single-family residential subdivision with 25% or less
impervious cover at total site build-out that involves a soil disturbance of
one (1) or more acres of land but less than or equal to five (5) acres and is
38
Page 1031 of 1493
Page 1032
Part IV.C.1.a.
not located in one of the watersheds listed in Appendix C and not directly
discharging to one of the 303(d) segments listed in Appendix D; and
b. the construction of a single-family home that involves soil disturbances of
one (1) or more acres but less than or equal to five (5) acres and is not
located in one of the watersheds listed in Appendix C and not directly
discharging to one of the 303(d) segments listed in Appendix D; and
c. construction on agricultural property that involves soil disturbances of one
(1) or more acres but less than five (5) acres; and
d. construction activities located in the New York City Watershed located
east of the Hudson River, see Appendix C Figure 1, that involve soil
disturbances of 5,000 square feet or more, but less than one acre.
2. The qualified inspector must conduct site inspections in accordance with the
following timetable:
a. For construction sites where soil disturbance activities are on-going, the
qualified inspector must conduct a site inspection at least once every
seven (7) calendar days; or
b. For construction sites where soil disturbance activities are on-going and
the owner or operator has received authorization in accordance with Part
I.E.6. to disturb greater than five (5) acres of soil at any one time, the
qualified inspector must conduct at least two (2) site inspections every
seven (7) calendar days. The two (2) inspections must be separated by a
minimum of two (2) full calendar days; or
c. For construction sites where soil disturbance activities have been
temporarily suspended (e.g. winter shutdown) and temporary stabilization
measures have been applied to all disturbed areas, the qualified inspector
must conduct a site inspection at least once every thirty (30) calendar
days. The owner or operator must notify the DOW Water (SPDES)
Program contact at the Regional Office (see contact information in
Appendix E) or, in areas under the jurisdiction of a Traditional Land Use
Control MS4 Operator, the Traditional Land Use Control MS4 Operator
(provided the Traditional Land Use Control MS4 Operator is not the owner
or operator of the construction activity) by hard copy or email prior to
reducing the inspections to this frequency and again by hard copy or email
prior to re-commencing construction; or
39
Page 1032 of 1493
Page 1033
Part IV.C.2.d.
d. For construction sites where soil disturbance activities have been shut
down with partial project completion, the requirement to have the qualified
inspector conduct inspections ceases if all areas disturbed as of the
project shutdown date have achieved final stabilization and all SMPs
required for the completed portion of the project have been constructed in
conformance with the SWPPP and are operational. The owner or operator
must notify the DOW Water (SPDES) Program contact at the Regional
Office (see contact information in Appendix E) or, in areas subject to the
review authority of Traditional Land Use Control MS4 Operator(s) in
accordance with Part I.D.2.b.ii.1., the Traditional Land Use Control MS4
Operator(s) (provided the Traditional Land Use Control MS4 Operator(s)
are not the owners or operators of the construction activity) in writing prior
to the shutdown and again in writing prior to resuming construction
activity. If soil disturbance activities are not resumed within 2 years from
the date of shutdown, the owner or operator must terminate coverage by
meeting the requirements of Part V; or
e. For construction sites involving soil disturbance of one (1) or more acres
that directly discharge to one of the 303(d) segments listed in Appendix D
or is located in one of the watersheds listed in Appendix C, the qualified
inspector must conduct at least two (2) site inspections every seven (7)
calendar days. The two (2) inspections must be separated by a minimum
of two (2) full calendar days.
3. At a minimum, the qualified inspector must inspect:
a. all erosion and sediment control practices and pollution prevention
measures to ensure integrity and effectiveness; and
b. all SMPs under construction to ensure that they are constructed in
conformance with the SWPPP; and
c. all areas of disturbance that have not achieved final stabilization; and
d. all points of discharge to surface waters of the State located within, or
immediately adjacent to, the property boundaries of the construction site;
and
e. all points of discharge from the construction site.
40
Page 1033 of 1493
Page 1034
Part IV.C.4.
4. The qualified inspector must prepare an inspection report subsequent to each
and every inspection. At a minimum, the inspection report must include and/or
address all of the following, for all construction activities except those listed in
Part IV.C.1.:
a. Permit identification number; and
b. Date and time of inspection; and
c. Name and title of person(s) performing inspection; and
d. A description of the weather and soil conditions (e.g. dry, wet, saturated)
at the time of the inspection, including the temperature at the time of the
inspection; and
e. A description of the condition of the runoff at all points of discharge from
the construction site. This must include identification of any discharges of
sediment from the construction site. Include discharges from conveyance
systems (i.e. pipes, culverts, ditches, etc.) and overland flow; and
f. A description of the condition of all surface waters of the State located
within, or immediately adjacent to, the property boundaries of the
construction site which receive runoff from disturbed areas. This must
include identification of any discharges of sediment to the surface waters
of the State; and
g. Identification of all erosion and sediment control practices and pollution
prevention measures that need repair or maintenance; and
h. Identification of all erosion and sediment control practices and pollution
prevention measures that were not installed properly or are not functioning
as designed and need to be reinstalled or replaced; and
i. Description and sketch (map) of areas with active soil disturbance activity,
areas that have been disturbed but are inactive at the time of the
inspection, and areas that have been stabilized (temporary and/or final)
since the last inspection; and
j. Estimates, in square feet or acres, of the following areas:
41
Page 1034 of 1493
Page 1035
Part IV.C.4.j.i.
i. Total area with active soil disturbance (not requiring either
temporary stabilization or final stabilization); and
ii. Total area with inactive soil disturbance (requiring either temporary
stabilization or final stabilization); and
iii. Total area that has achieved temporary stabilization; and
iv. Total area that has achieved final stabilization; and
k. Current stage of construction of all SMPs and identification of all
construction activity on site that is not in conformance with the SWPPP
and technical standards; and
l. Corrective action(s) that must be taken to install, repair, replace or
maintain erosion and sediment control practices and pollution prevention
measures; and to correct deficiencies identified with the construction of
the SMP(s); and
m. Identification and status of all corrective actions that were required by
previous inspection; and
n. Digital photographs, with date stamp, that clearly show the condition of all
practices that have been identified as needing corrective actions. The
qualified inspector must attach color copies of the digital photographs to
the inspection report being maintained onsite within seven (7) calendar
days of the date of the inspection. The qualified inspector must also take
digital photographs, with date stamp, that clearly show the condition of the
practice(s) after the corrective action has been completed. The qualified
inspector must attach paper color copies of the digital photographs to the
inspection report that documents the completion of the corrective action
work within seven (7) calendar days of that inspection.
5. Within one business day of the completion of an inspection, the qualified
inspector must notify the owner or operator, and appropriate contractor or
subcontractor identified in Part III.A.7., of any corrective actions that need to
be taken. The contractor or subcontractor must:
a. if the corrective action does not require engineering design:
42
Page 1035 of 1493
Page 1036
Part IV.C.5.a.i.
i. begin implementing corrective actions within one business day; and
ii. complete the corrective actions within five business days; or
b. if the corrective action requires engineering design:
i. begin the engineering design process within five business days;
and
ii. complete the corrective action in a reasonable time frame but no
later than within 60 calendar days.
6. All inspection reports must be signed by the qualified inspector. In
accordance with Part I.E.3., the inspection reports must be maintained on site
with the SWPPP.
Part V. How to Terminate CGP Coverage
A. Electronic Notice of Termination (eNOT) Submittal
The eNOT contains questions to ensure requirements in Part V.A. have been
met.
1. An owner or operator must terminate coverage when one or more of the
following requirements have been met:
a. Total project completion:
i. all construction activity identified in the SWPPP has been
completed; and
ii. all areas of disturbance have achieved final stabilization; and
iii. all temporary, structural erosion and sediment control measures
have been removed; and
iv. all SMPs have been constructed in conformance with the SWPPP
and are operational; and
v. an as-built drawing has been prepared; or
43
Page 1036 of 1493
Page 1037
Part V.A.1.b.
b. Planned shutdown with partial project completion:
i. all soil disturbance activities have ceased; and
ii. all areas disturbed as of the project shutdown date have achieved
final stabilization; and
iii. all temporary, structural erosion and sediment control measures
have been removed; and
iv. all SMPs required for the completed portion of the project have
been constructed in conformance with the SWPPP and are
operational; and
v. an as-built drawing has been prepared; or
c. In accordance with Part I.G. Change of Owner or Operator; or
d. The owner or operator has obtained coverage under an alternative
general SPDES permit or an individual SPDES permit.
2. For construction activities that require qualified inspector inspections in
accordance with Part IV.C.1. and have met Part V.A.1.a. or b., the owner or
operator must have the qualified inspector perform a final site inspection prior
to submitting the eNOT. The qualified inspector must, by signing the “Final
Stabilization” and “Post-Construction Stormwater Management Practice(s)”
certification statements on the eNOT, certify that all the requirements in Part
V.A.1.a. or b. have been achieved.
3. For construction activities that are subject to the review authority of
Traditional Land Use Control MS4 Operator(s) in accordance with Part
I.D.2.b.ii.1. and meet Part V.A.1.a. or b., the owner or operator must have the
Traditional Land Use Control MS4 Operator(s) sign the “MS4 Acceptance”
statement on the eNOT in accordance with the requirements in Part VII.J. A
Traditional Land Use Control MS4 Operator official, by signing this statement,
determined that it is acceptable for the owner or operator to submit the eNOT
in accordance with the requirements of this Part. A Traditional Land Use
Control MS4 Operator can make this determination by performing a final site
inspection themselves or by accepting the qualified inspector’s final site
inspection certification(s) when required in Part V.A.2.
44
Page 1037 of 1493
Page 1038
Part V.A.4.
4. For construction activities that require SMPs and meet Part V.A.1.a. or b., the
owner or operator must, prior to submitting the eNOT, ensure one of the
following:
a. for SMP(s) that were constructed by a private entity, but will be owned,
operated, and maintained by a public entity, the SMP(s) and any right-of-
way(s) needed to operate and maintain such practice(s) have been
deeded to the municipality in which the practice(s) is located; or
b. for SMP(s) that are privately owned, but will be operated and maintained
by a public entity, an executed operation and maintenance agreement is in
place with the municipality that will operate and maintain the SMP(s); or
c. for SMP(s) that are privately owned, the owner or operator has a
mechanism in place that requires operation and maintenance of the
practice(s) in accordance with the operation and maintenance plan, such
as a deed covenant in the owner or operator’s deed of record; or
d. for SMP(s) that are owned by a public or private institution (e.g. school,
university, hospital), government agency or authority, or public utility, the
owner or operator has policies and procedures in place that ensure
operation and maintenance of the practices in accordance with the
operation and maintenance plan.
5. An owner or operator that has met the requirements of Part V.A.1., 2., 3., and 4.
must request termination of coverage under this permit by submitting a complete
Notice of Termination form electronically using a NYSDEC approved form. 5
a. The owner’s or operator’s coverage is terminated as of the termination
date indicated in the Letter of Termination (LOT), which is sent by
NYSDEC after a complete eNOT is submitted.
5 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or (d). All waiver requests must
be submitted to [email protected] or NYSDEC, Bureau of Water Permits, 625 Broadway, 4th
Floor, Albany, New York 12233-3505.
45
Page 1038 of 1493
Page 1039
Part VI.
Part VI. Record Retention and Reporting
A. Record Retention
The owner or operator must retain a copy of the documents listed in Part I.E.3. and a
copy of the LOT for a period of at least five years from the date that NYSDEC
accepts a complete NOT submitted in accordance with Part V.
B. Reporting
Except for the eNOI, the signature forms associated with the eNOI, and the eNOT,
all other written correspondence requested by NYSDEC, including individual permit
applications, must be sent to the address of the appropriate DOW (SPDES) Program
contact at the Regional Office listed in Appendix E.
Part VII. Standard Permit Requirements
For the purposes of this permit, examples of contractors and subcontractors include:
third-party maintenance and construction contractors.
A. Duty to Comply
The owner or operator, and all contractors or subcontractors, must comply with all
requirements of this permit. Any non-compliance with the requirements of this permit
constitutes a violation of the New York State Environmental Conservation Law
(ECL), and its implementing regulations, and is grounds for enforcement action.
Filing of a request for termination of coverage under this permit, or a notification of
planned changes or anticipated non-compliance, does not limit, diminish or stay
compliance with any requirements of this permit.
B. Need to Halt or Reduce Activity Not a Defense
The necessity to halt or reduce the construction activity regulated by this permit, in
order to maintain compliance with the requirements of this permit, must not be a
defense in an enforcement action.
C. Penalties
There are substantial criminal, civil, and administrative penalties associated with
violating the requirements of this permit. Fines of up to $37,500 per day for each
46
Page 1039 of 1493
Page 1040
Part VII.C.
violation and imprisonment for up to 15 years may be assessed depending upon the
nature and degree of the offense.
D. False Statements
Any person who knowingly makes any false material statement, representation, or
certification in any application, record, report, or other document filed or required to
be maintained under this permit, including monitoring reports or reports of
compliance or noncompliance must, upon conviction, be punished in accordance
with ECL §71-1933 and or New York State Penal Law Articles 175 and 210.
E. Re-Opener Clause
Upon issuance of this permit, a determination has been made on the basis of a
submitted Notice of Intent, plans, or other available information, that compliance with
the specified permit requirements will reasonably protect classified water use and
assure compliance with applicable water quality standards. Satisfaction of the
requirements of this permit notwithstanding, if operation pursuant to this permit
causes or contributes to a condition in contravention of State water quality standards
or guidance values, or if NYSDEC determines that a modification is necessary to
prevent impairment of the best use of the waters or to assure maintenance of water
quality standards or compliance with other provisions of ECL Article 17 or the Clean
Water Act (CWA), or any regulations adopted pursuant thereto, NYSDEC may
require such modification and the Commissioner may require abatement action to be
taken by the owner or operator and may also prohibit such operation until the
modification has been implemented.
F. Duty to Mitigate
The owner or operator, and its contractors and subcontractors, must take all
reasonable steps to minimize or prevent any discharge in violation of this permit
which has a reasonable likelihood of adversely affecting human health or the
environment.
G. Requiring Another General Permit or Individual SPDES Permit
NYSDEC may require any owner or operator authorized to discharge in accordance
with this permit to apply for and obtain an individual SPDES permit or apply for
authorization to discharge in accordance with another general SPDES permit.
1. Cases where an individual SPDES permit or authorization to discharge in
accordance with another general SPDES permit may be required include, but is
not limited to the following:
47
Page 1040 of 1493
Page 1041
Part VII.G.1.a.
a. the owner or operator is not in compliance with the conditions of this
permit or does not meet the requirements for coverage under this permit;
and
b. a change has occurred in the availability of demonstrated technology or
practices for the control or abatement of pollutants applicable to the point
source; and
c. new effluent limitation guidelines or new source performance standards
are promulgated that are applicable to point sources authorized to
discharge in accordance with this permit; and
d. existing effluent limitation guidelines or new source performance
standards that are applicable to point sources authorized to discharge in
accordance with this permit are modified; and
e. a water quality management plan containing requirements applicable to
such point sources is approved by NYSDEC; and
f. circumstances have changed since the time of the request to be covered
so that the owner or operator is no longer appropriately controlled under
this permit, or either a temporary or permanent reduction or elimination of
the authorized discharge is necessary; and
g. the discharge is in violation of section 17-0501 of the ECL; and
h. the discharge(s) is a significant contributor of pollutants. In making this
determination, NYSDEC may consider the following factors:
i. the location of the discharge(s) with respect to surface waters of the
State; and
ii. the size of the discharge(s); and
iii. the quantity and nature of the pollutants discharged to surface
waters of the State; and
iv. other relevant factors including compliance with other provisions of
ECL Article 17, or the CWA.
2. When NYSDEC requires any owner or operator authorized by this permit to apply
for an individual SPDES permit as provided for in this subdivision, it must notify
the owner or operator in writing that a permit application is required. This notice
must include a brief statement of the reasons for this decision, an application
48
Page 1041 of 1493
Page 1042
Part VII.G.2.
form, a statement setting a time for the owner or operator to file the application
for an individual SPDES permit, and a deadline, not sooner than 180 days from
the owner’s or operator's receipt of the notification letter, whereby the
authorization to discharge under this permit must be terminated. NYSDEC may
grant additional time upon demonstration, to the satisfaction of the RWE, 6 that
additional time to apply for an alternative authorization is necessary or where
NYSDEC has not provided a permit determination in accordance with 6 NYCRR
Part 621.
3. When an individual SPDES permit is issued to an owner or operator authorized
to discharge under this permit for the same discharge(s), this permit authorization
for construction activities authorized under the individual SPDES permit is
automatically terminated on the effective date of the individual SPDES permit
unless termination is earlier in accordance with 6 NYCRR Part 750.
H. Duty to Provide Information
The owner or operator must furnish to NYSDEC, within five business days,
unless otherwise set forth by NYSDEC, any information that NYSDEC may request
to determine whether cause exists to determine compliance with this permit or to
determine whether cause exists for requiring an individual SPDES permit in
accordance with 6 NYCRR 750-1.21(e) (see Part VII.G. Requiring Another General
Permit or Individual Permit).
The owner or operator must make available to NYSDEC, for inspection and copying,
or furnish to NYSDEC within 25 business days of receipt of a NYSDEC request for
such information, any information retained in accordance with this permit.
Except for Part I.D.4. and 5. and Part I.G., the following applies: where the owner or
operator becomes aware that it failed to submit any relevant facts on the Notice of
Intent, or submitted incorrect information in a Notice of Intent or in any report to
NYSDEC, the owner or operator must submit such facts or corrected information to
NYSDEC within five business days.
I. Extension
In the event a new permit is not issued and effective prior to the expiration of this
permit, and this permit is extended pursuant to the State Administrative Procedure
Act and 6 NYCRR Part 621, then the owner or operator with coverage under this
permit may continue to operate and discharge in accordance with the requirements
of this permit until a new permit is issued and effective.
6 The Regional Water Manager where a DEC Region does not have a RWE.
49
Page 1042 of 1493
Page 1043
Part VII.J.
J. Signatories and Certification
The Notice of Intent, Notice of Termination, and reports required by this permit must
be signed as provided in 40 CFR §122.22.
1. All Notices of Intent and Notices of Termination must be signed as follows:
a. For a corporation. By a responsible corporate officer. For the purpose of
this section, a responsible corporate officer means:
(i) a president, secretary, treasurer, or vice-president of the corporation
in charge of a principal business function, or any other person who
performs similar policy- or decision-making functions for the
corporation; or
(ii) the manager of one or more manufacturing, production or operating
facilities, provided, the manager is authorized to make management
decisions which govern the operation of the regulated facility
including having the explicit or implicit duty of making major capital
investment recommendations, and initiating and directing other
comprehensive measures to assure long term environmental
compliance with environmental laws and regulations; the manager
can ensure that the necessary systems are established or actions
taken to gather complete and accurate information for Notice of Intent
or Notice of Termination requirements; and where authority to sign
documents has been assigned or delegated to the manager in
accordance with corporate procedures.
Note: NYSDEC does not require specific assignments or delegations of
authority to responsible corporate officers identified in 40 CFR
§122.22(a)(1)(i). NYSDEC will presume that these responsible corporate
officers have the requisite authority to sign the Notice of Intent or Notice of
Termination unless the corporation has notified NYSDEC to the contrary.
Corporate procedures governing authority to sign a Notice of Intent or
Notice of Termination may provide for assignment or delegation to
applicable corporate positions under 40 CFR §122.22(a)(1)(ii) rather than
to specific individuals.
b. For a partnership or sole proprietorship. By a general partner or the
proprietor, respectively.
50
Page 1043 of 1493
Page 1044
Part VII.J.1.c.
c. For a municipality, State, Federal, or other public agency. By either a
principal executive officer or ranking elected official. For purposes of this
section, a principal executive officer of a Federal agency includes:
1. the chief executive officer of the agency; or
2. a senior executive officer having responsibility for the overall
operations of a principal geographic unit of the agency (e.g.,
Regional Administrators of EPA).
2. All reports required by this permit, and other information requested by
NYSDEC, must be signed by a person described in Part VII.J.1., or by a duly
authorized representative of that person. A person is a duly authorized
representative only if:
a. The authorization is made in writing by a person described in Part VII.J.1.
or using the Duly Authorized Form, found on the DEC website; and
b. The authorization specifies either an individual or a position having
responsibility for the overall operation of the regulated facility or activity,
position of equivalent responsibility, or an individual or position having
overall responsibility for environmental matters for the company. (A duly
authorized representative may thus be either a named individual or any
individual occupying a named position); and
c. The written authorization is submitted to NYSDEC.
3. Changes to authorization. If an authorization under Part VII.J.2. is no longer
accurate because a different individual or position has responsibility for the
overall operation of the construction activity, a new authorization satisfying
the requirements of Part VII.J.2. must be submitted to NYSDEC prior to or
together with any reports, information, or applications to be signed by an
authorized representative.
4. Certification. Any person signing a document under Part VII.J.1. or 2. must
make the following certification:
I certify under penalty of law that this document and all attachments were
prepared under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who
51
Page 1044 of 1493
Page 1045
Part VII.J.4.
manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
5. Electronic reporting. If documents described in Part VII.J.1. or 2. are
submitted electronically by or on behalf of the construction activity with
coverage under this permit, any person providing the electronic signature for
such documents must meet all relevant requirements of this section, and
must ensure that all of the relevant requirements of 40 CFR Part 3 (including,
in all cases, subpart D to Part 3) (Cross-Media Electronic Reporting) and 40
CFR Part 127 (NPDES Electronic Reporting Requirements) are met for that
submission.
K. Inspection and Entry
The owner or operator must allow NYSDEC, the USEPA Regional Administrator, the
applicable county health department, or any authorized representatives of those
entities, or, in the case of a construction site which discharges through an MS4, an
authorized representative of the MS4 receiving the discharge, upon the presentation
of credentials and other documents as may be required by law, to:
1. enter upon the owner’s or operator's premises where a regulated facility or
activity is located or conducted or where records must be kept under the
requirements of this permit; and
2. have access to and copy at reasonable times, any records that must be kept
under the requirements of this permit, including records required to be
maintained for purposes of operation and maintenance; and
3. inspect at reasonable times any facilities, equipment (including monitoring
and control equipment), practices or operations regulated or required under
this permit; and
4. sample or monitor at reasonable times, for the purposes of assuring general
SPDES permit compliance or as otherwise authorized by the CWA or ECL,
any substances or parameters at any location; and
5. enter upon the property of any contributor to the regulated facility or activity
under authority of the owner or operator.
52
Page 1045 of 1493
Page 1046
Part VII.L.
L. Confidentiality of Information
The following must not be held confidential: this permit, the fact sheet for this permit,
the name and address of any owner or operator, effluent data, the Notice of Intent,
and information regarding the need to obtain an individual permit or an alternative
general SPDES permit. This includes information submitted on forms themselves
and any attachments used to supply information required by the forms (except
information submitted on usage of substances). Upon the request of the owner or
operator, NYSDEC must make determinations of confidentiality in accordance with 6
NYCRR Part 616, except as set forth in the previous sentence. Any information
accorded confidential status must be disclosed to the Regional Administrator upon
his or her written request. Prior to disclosing such information to the Regional
Administrator, NYSDEC will notify the Regional Administrator of the confidential
status of such information.
M. Other Permits May Be Required
Nothing in this permit relieves the owner or operator from a requirement to obtain
any other permits required by law.
N. NYSDEC Orders or Civil Decrees/Judgments
The issuance of this permit by the NYSDEC, and the coverage under this permit by
the owner or operator, does not supersede, revoke, or rescind any existing order on
consent or civil Decree/Judgment, or modification to any such documents or to any
order issued by the Commissioner, or any of the terms, conditions, or requirements
contained in such order or modification therefore, unless expressly noted.
O. Property Rights
Coverage under this permit does not convey any property rights in either real or
personal property, or any exclusive privileges, nor does it authorize any injury to
private property or any invasion of personal rights, nor any infringement of Federal,
State, or local laws or regulations, nor does it obviate the necessity of obtaining the
assent of any other jurisdiction as required by law for the discharge authorized.
P. Compliance with Interstate Standards
If the construction activity covered by this permit originates within the jurisdiction of
an interstate water pollution control agency, then the construction activity must also
comply with any applicable effluent standards or water quality standards
promulgated by that interstate agency and as set forth in this permit for such
construction activities.
53
Page 1046 of 1493
Page 1047
Part VII.Q.
Q. Oil and Hazardous Substance Liability
Coverage under this permit does not affect the imposition of responsibilities upon, or
the institution of any legal action against, the owner or operator under section 311 of
the CWA, which must be in conformance with regulations promulgated pursuant to
section 311 governing the applicability of section 311 of the CWA to discharges from
facilities with NPDES permits, nor must such issuance preclude the institution of any
legal action or relieve the owner or operator from any responsibilities, liabilities, or
penalties to which the owner or operator is or may be subject pursuant to the
Comprehensive Environmental Response, Compensation and Liability Act of 1980,
42 U.S.C. section 9601 et seq. (CERCLA).
R. Severability
The provisions of this permit are severable, and if any provision of this permit, or the
application of any provision of this permit to any circumstance, is held invalid, the
application of such provision to other circumstances, and the remainder of this
permit, must not be affected thereby.
S. NYSDEC Approved Forms
The owner or operator must provide all relevant information that is requested by
NYSDEC, and required by this permit, on all NYSDEC approved forms.
54
Page 1047 of 1493
Page 1048
Appendix A
APPENDIX A – Abbreviations and Definitions
Abbreviations
APO – Agency Preservation Officer
BB – New York State Standards and Specifications for Erosion and Sediment Control
(Blue Book), dated November 2016
BMP – Best Management Practice
CPESC – Certified Professional in Erosion and Sediment Control
CPv – Channel Protection Volume
CWA – Clean Water Act (or the Federal Water Pollution Control Act, 33 U.S.C. §1251 et
seq)
DM – New York State Stormwater Management Design Manual (Design Manual), dated
July 31, 2024
DOW – Division of Water
EAF – Environmental Assessment Form
ECL – chapter 43-B of the Consolidated Laws of the State of New York, entitled the
Environmental Conservation Law
EPA – U.S. Environmental Protection Agency
HSG – Hydrologic Soil Group
MS4 – Municipal Separate Storm Sewer System
NOI – Notice of Intent
NOT – Notice of Termination
NPDES – National Pollutant Discharge Elimination System
NYC – The City of New York
NYCDEP – The City of New York Department of Environmental Protection
NYSDEC – The New York State Department of Environmental Conservation
OPRHP – Office of Parks, Recreation and Historic Places
Qf – Extreme Flood
Qp – Overbank Flood
RR – Runoff Reduction
RRv – Runoff Reduction Volume
RWE – Regional Water Engineer
SEQR – State Environmental Quality Review Act
SHPA – State Historic Preservation Act
SMP – Post-Construction Stormwater Management Practice
SPDES – State Pollutant Discharge Elimination System
SWPPP – Stormwater Pollution Prevention Plan
TMDL – Total Maximum Daily Load
UPA – Uniform Procedures Act
USDA – United States Department of Agriculture
WQv – Water Quality Volume
55
Page 1048 of 1493
Page 1049
Appendix A
Definitions
All definitions in this section are solely for the purposes of this permit. If a word is not
italicized in the permit, use its common definition.
Agricultural Building – a structure designed and constructed to house farm
implements, hay, grain, poultry, livestock or other horticultural products; excluding any
structure designed, constructed or used, in whole or in part, for human habitation, as a
place of employment where agricultural products are processed, treated or packaged,
or as a place used by the public.
Agricultural Property – the land for construction of a barn, agricultural building, silo,
stockyard, pen or other structural practices identified in Table II in the “Agricultural Best
Management Practice Systems Catalogue” (dated June 2023).
Alter Hydrology from Pre- to Post-Development Conditions – the post-development
peak flow rate(s) has increased by more than 5% of the pre-developed condition for the
design storm of interest (e.g. 10 yr and 100 yr).
Combined Sewer System – a sewer system which conveys sewage and stormwater
through a single pipe system to a publicly owned treatment works.
Commence (Commencement of) Construction Activities – the initial disturbance of
soils associated with clearing, grading or excavation activities; or other construction
related activities that disturb or expose soils such as demolition, stockpiling of fill
material, and the initial installation of erosion and sediment control practices required in
the SWPPP. See definition for “Construction Activity(ies)” also.
Common Plan of Development or Sale – a contiguous area where multiple separate
and distinct construction activities are occurring, or may occur, under one plan. The
“common plan” of development or sale is broadly defined as any announcement or
piece of documentation (including a sign, public notice or hearing, marketing plan,
advertisement, drawing, permit application, State Environmental Quality Review Act
(SEQR) environmental assessment form or other documents, zoning request, computer
design, etc.) or physical demarcation (including boundary signs, lot stakes, surveyor
markings, etc.) indicating construction activities may occur on a specific plot. A common
plan of development or sale is comprised of two or more phases.
Common plan of development or sale does not include separate and distinct
construction activities that are occurring, or may occur, under one plan that are at least
1/4 mile apart provided any interconnecting road, pipeline or utility project that is part of
the same “common plan” is not concurrently being disturbed.
56
Page 1049 of 1493
Page 1050
Appendix A
Construction Activity(ies) – identified within 40 CFR 122.26(b)(14)(x),
122.26(b)(15)(i), and 122.26(b)(15)(ii), any clearing, grading, excavation, filling,
demolition or stockpiling activities that result in soil disturbance. Clearing activities can
include, but are not limited to, mechanized logging equipment operation, the cutting and
skidding of trees, stump removal and/or brush root removal.
Construction activity does not include routine maintenance that is performed to maintain
the original line and grade, hydraulic capacity, or original purpose of a facility, which is
excluded from the calculation of the soil disturbance for a project. Routine maintenance
includes, but is not limited to:
Re-grading of gravel roads or parking lots; and
Cleaning and shaping of existing roadside ditches and culverts that maintains
the approximate original line and grade, and maintains or improves the
hydraulic capacity of the ditch; and
Replacement of existing culverts that maintains the approximate original line
and grade, and maintains or improves the hydraulic capacity of a ditch; and
Replacement of existing bridges that maintains the approximate original line
and grade, and maintains or improves the hydraulic capacity beneath the
bridges; and
Cleaning and shaping of existing roadside ditches that does not maintain the
approximate original grade, hydraulic capacity and purpose of the ditch if the
changes to the line and grade, hydraulic capacity or purpose of the ditch are
installed to improve water quality and quantity controls (e.g. installing grass
lined ditch); and
Placement of aggregate shoulder backing that stabilizes the transition between
the road shoulder and the ditch or embankment; and
Full depth milling and filling of existing asphalt pavements, replacement of
concrete pavement slabs, and similar work that does not expose soil or disturb
the bottom six (6) inches of subbase material; and
Long-term use of equipment storage areas at or near highway maintenance
facilities; and
Removal of sediment from the edge of the highway to restore a previously
existing sheet-flow drainage connection from the highway surface to the
highway ditch or embankment; and
Existing use of Canal Corp owned upland disposal sites for the canal, and
Replacement of curbs, gutters, sidewalks and guide rail posts; and
Maintenance of ski trails including brush hog use and mowing; and
Above ground snowmaking pipe replacement; and
Replacement of existing utility poles; etc.
Construction Site – the land area where construction activity(ies) will occur. See also
the definitions for “Commence (Commencement of) Construction Activities” and
“Common Plan of Development or Sale.”
57
Page 1050 of 1493
Page 1051
Appendix A
Dewatering – the act of draining rainwater and/or groundwater from building
foundations, vaults or excavations/trenches.
Directly Discharge(s)(ing) (to a specific surface waterbody) – runoff flows from a
construction site by overland flow and the first point of discharge is the specific surface
waterbody, or runoff flows from a construction site to a separate storm sewer system
and the first point of discharge from the separate storm sewer system is the specific
surface waterbody.
Discharge(s)(d) – any addition of any pollutant to waters of the State through an outlet
or point source.
Embankment – an earthen or rock slope that supports a road/highway.
Equivalent (Equivalence) – the practice or measure meets all the performance,
longevity, maintenance, and safety objectives of the technical standard and will provide
an equal or greater degree of water quality protection.
Final Stabilization – all soil disturbance activities have ceased and a uniform, perennial
vegetative cover with a density of eighty (80) percent over the entire pervious surface
has been established; or other equivalent stabilization measures, such as permanent
landscape mulches, rock rip-rap or washed/crushed stone have been applied on all
disturbed areas that are not covered by permanent structures, concrete or pavement.
Historic Property – any building, structure, site, object or district that is listed on the
State or National Registers of Historic Places or is determined to be eligible for listing on
the State or National Registers of Historic Places.
Impervious Area (Cover) – all impermeable surfaces that cannot effectively infiltrate
rainfall. This includes paved, concrete and compacted gravel surfaces (i.e. parking lots,
driveways, roads, runways and sidewalks); building rooftops and miscellaneous
impermeable structures such as patios, pools, and sheds.
Infeasible – not technologically possible, or not economically practicable and
achievable considering best industry practices.
Minimize(ing)(ation) – reduce and/or eliminate to the extent achievable using control
measures (including best management practices) that are technologically available and
economically practicable and achievable in light of best industry practices.
Municipal Separate Storm Sewer System (MS4) - a conveyance or system of
conveyances (including roads with drainage systems, municipal streets, catch basins,
curbs, gutters, ditches, man-made channels, or storm drains):
58
Page 1051 of 1493
Page 1052
Appendix A
1. owned or operated by a State, city, town, village, borough, county, parish,
district, association, or other public body (created by or pursuant to State
law) having jurisdiction over disposal of sewage, industrial wastes,
stormwater, or other wastes, including special districts under State law such
as a sewer district, flood control district or drainage district, or similar entity,
or an Indian tribe or an authorized Indian tribal organization, or a designated
and approved management agency under section 208 of the CWA, that
discharges to surface waters of the State; and
2. designed or used for collecting or conveying stormwater; and
3. which is not a combined sewer system; and
4. which is not part of a Publicly Owned Treatment Works (POTW) as defined
at 40 CFR 122.2.
Natural Buffer(s) – an undisturbed area with natural cover running along a surface
water (e.g. wetland, stream, river, lake, etc.).
New Development – any land disturbance that does not meet the definition of
Redevelopment Activity included in this appendix.
New York State Erosion and Sediment Control Certificate Program – a certificate
program that establishes and maintains a process to identify and recognize individuals
who are capable of developing, designing, inspecting and maintaining erosion and
sediment control plans on projects that disturb soils in New York State. The certificate
program is administered by the New York State Conservation District Employees
Association.
Nonpoint Source(s) – any source of water pollution or pollutants which is not a discrete
conveyance or point source permitted pursuant to Title 7 or 8 of Article 17 of the
Environmental Conservation Law (see ECL Section 17-1403).
Overbank – flow events that exceed the capacity of the stream channel and spill out
into the adjacent floodplain.
Owner or Operator – the person, persons, or legal entity which owns or leases the
property on which the construction activity is occurring; an entity that has operational
control over the construction plans and specifications, including the ability to make
modifications to the plans and specifications; and/or an entity that has day-to-day
operational control of those activities at a project that are necessary to ensure
compliance with the permit requirements.
59
Page 1052 of 1493
Page 1053
Appendix A
Performance Criteria – the six performance criteria for each group of SMPs in
Chapters 5 and 6 of the technical standard, New York State Stormwater Management
Design Manual (DM), dated July 31, 2024. These include feasibility, conveyance,
pretreatment, treatment, landscaping, and maintenance. It does not include the Sizing
Criteria (i.e. WQv, RRv, CPv, Qp and Qf) in Part I.C.2. of the permit.
Phase – a defined area in which construction activities are occurring or will occur
separate from other defined area(s).
Point Source – any discernible, confined, and discrete conveyance, including but
not limited to any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container,
rolling stock, concentrated animal feeding operation, vessel or other floating craft, or
landfill leachate collection system from which pollutants are or may be discharged.
Pollutant(s) – dredged spoil, filter backwash, solid waste, incinerator residue, sewage,
garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive
materials, heat, wrecked or discarded equipment, rock, sand and industrial, municipal,
agricultural waste and ballast discharged into water; which may cause or might
reasonably be expected to cause pollution of the waters of the state in contravention of
the standards or guidance values adopted as provided in 6 NYCRR Parts 700 et seq.
Qualified Inspector – a person that is knowledgeable in the principles and practices of
erosion and sediment control, such as a licensed Professional Engineer, Certified
Professional in Erosion and Sediment Control (CPESC), Registered Landscape
Architect, New York State Erosion and Sediment Control Certificate Program holder or
other NYSDEC endorsed individual(s).
It can also mean someone working under the direct supervision of, and at the same
company as, the licensed Professional Engineer or Registered Landscape Architect,
provided that person has training in the principles and practices of erosion and sediment
control. Training in the principles and practices of erosion and sediment control means
that the individual working under the direct supervision of the licensed Professional
Engineer or Registered Landscape Architect has received four (4) hours of NYSDEC
endorsed training in proper erosion and sediment control principles from a Soil and
Water Conservation District, or other NYSDEC endorsed entity. After receiving the initial
training, the individual working under the direct supervision of the licensed Professional
Engineer or Registered Landscape Architect shall receive four (4) hours of training
every three (3) years.
It can also mean a person that meets the Qualified Professional qualifications in
addition to the Qualified Inspector qualifications.
Note: Inspections of any SMPs that include structural components, such as a dam for
an impoundment, shall be performed by a licensed Professional Engineer.
60
Page 1053 of 1493
Page 1054
Appendix A
Qualified Professional – a person that is knowledgeable in the principles and practices
of stormwater management and treatment, such as a licensed Professional Engineer,
Registered Landscape Architect or other NYSDEC endorsed individual(s). Individuals
preparing SWPPPs that require the SMP component must have an understanding of the
principles of hydrology, water quality management practice design, water quantity
control design, and, in many cases, the principles of hydraulics. All components of the
SWPPP that involve the practice of engineering, as defined by the NYS Education Law
(see Article 145), shall be prepared by, or under the direct supervision of, a professional
engineer licensed to practice in the State of New York.
Redevelopment Activity(ies) – the disturbance and reconstruction of existing
impervious area, including impervious areas that were removed from a project site
within five (5) years of preliminary project plan submission to the local government (i.e.
site plan, subdivision, etc.).
Renewable Energy – electricity or thermal energy generated by renewable energy
systems through use of the following technologies: solar thermal, photovoltaics, on land
and offshore wind, hydroelectric, geothermal electric, geothermal ground source heat,
tidal energy, wave energy, ocean thermal, and fuel cells which do not utilize a fossil fuel
resource in the process of generating electricity.
Site Limitations – site conditions that prevent the use of an infiltration technique and or
infiltration of the total WQv. Typical site limitations include: seasonal high groundwater,
shallow depth to bedrock, and soils with an infiltration rate less than 0.5 inches/hour.
The existence of site limitations shall be confirmed and documented using actual field
testing (i.e. test pits, soil borings, and infiltration test) or using information from the most
current United States Department of Agriculture (USDA) Soil Survey for the County
where the project is located.
Sizing Criteria – the criteria included in Part I.C.2 of the permit that are used to size
SMPs. The criteria include; Water Quality Volume (WQv), Runoff Reduction Volume
(RRv), Channel Protection Volume (Cpv), Overbank Flood (Qp), and Extreme Flood
(Qf).
Steep Slope – land area designated on the current United States Department of
Agriculture (USDA) Soil Survey as Soil Slope Phase D, (provided the map unit name or
description is inclusive of slopes greater than 25%), or Soil Slope Phase E or F,
(regardless of the map unit name), or a combination of the three designations.
Stormwater – that portion of precipitation that, once having fallen to the ground, is in
excess of the evaporative or infiltrative capacity of soils, or the retentive capacity of
surface features, which flows or will flow off the land by surface runoff to waters of the
State.
61
Page 1054 of 1493
Page 1055
Appendix A
Streambank – the terrain alongside the bed of a creek or stream. The bank consists of
the sides of the channel, between which the flow is confined.
Stormwater Pollution Prevention Plan (SWPPP) – a project specific report, including
construction drawings, that among other things: describes the construction activity(ies),
identifies the potential sources of pollution at the construction site; describes and shows
the stormwater controls that will be used to control the pollutants (i.e. erosion and
sediment controls; for many projects, includes SMPs); and identifies procedures the
owner or operator will implement to comply with the requirements of the permit. See
Part III of the permit for a complete description of the information that must be included
in the SWPPP.
Surface Waters of the State – shall be construed to include lakes, bays, sounds,
ponds, impounding reservoirs, springs, rivers, streams, creeks, estuaries, marshes,
inlets, canals, the Atlantic ocean within the territorial seas of the state of New York and
all other bodies of surface water, natural or artificial, inland or coastal, fresh or salt,
public or private (except those private waters that do not combine or effect a junction
with natural surface waters), which are wholly or partially within or bordering the state or
within its jurisdiction. Waters of the state are further defined in 6 NYCRR Parts 800 to
941.
Temporarily Ceased – an existing disturbed area will not be disturbed again within 14
calendar days of the previous soil disturbance.
Temporary Stabilization – exposed soil has been covered with material(s) as set forth
in the technical standard, New York Standards and Specifications for Erosion and
Sediment Control, to prevent the exposed soil from eroding. The materials can include,
but are not limited to, mulch, seed and mulch, and erosion control mats (e.g. jute twisted
yarn, excelsior wood fiber mats).
Total Maximum Daily Load (TMDL) – the sum of the allowable loads of a single
pollutant from all contributing point and nonpoint sources. It is a calculation of the
maximum amount of a pollutant that a waterbody can receive and still meet water
quality standards, and an allocation of that amount to the pollutant's sources. A TMDL
stipulates Waste Load Allocations (WLA) for point source discharges, Load Allocations
(LA) for nonpoint sources, and a margin of safety (MOS).
Traditional Land Use Control MS4 Operator – a city, town, or village with land use
control authority that is authorized to discharge under New York State DEC’s SPDES
General Permit For Stormwater Discharges from Municipal Separate Stormwater Sewer
Systems (MS4s) or the City of New York’s Individual SPDES Permit for their Municipal
Separate Storm Sewer Systems (NY-0287890).
Trained Contractor – an employee from the contracting (construction) company,
identified in Part III.A.7., that has received four (4) hours of NYSDEC endorsed training
62
Page 1055 of 1493
Page 1056
Appendix A
in proper erosion and sediment control principles from a Soil and Water Conservation
District, or other NYSDEC endorsed entity. After receiving the initial training, the trained
contractor shall receive four (4) hours of training every three (3) years.
It can also mean an employee from the contracting (construction) company, identified in
Part III.A.7., that meets the qualified inspector qualifications (e.g. licensed Professional
Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered
Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same
company as, the licensed Professional Engineer or Registered Landscape Architect,
provided they have received four (4) hours of NYSDEC endorsed training in proper
erosion and sediment control principles from a Soil and Water Conservation District, or
other NYSDEC endorsed entity).
The trained contractor is responsible for the day-to-day implementation of the SWPPP.
Tree Clearing – construction activities limited to felling and removal of trees.
Tree clearing does not include hand felling and leaving the trees in place with no
support from mechanized equipment, which is not considered construction activity
requiring coverage under this permit.
Water Quality Standard – such measures of purity or quality for any waters in relation
to their reasonable and necessary use as promulgated in 6 NYCRR Part 700 et seq.
63
Page 1056 of 1493
Page 1057
Appendix B
APPENDIX B – Required SWPPP Components by Project Type
Table 1
CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP
THAT ONLY INCLUDES EROSION AND SEDIMENT CONTROLS
The following construction activities that involve soil disturbances of one (1) or more acres of
land, but less than five (5) acres:
• Single-family home not located in one of the watersheds listed in Appendix C and not directly
discharging to one of the 303(d) segments listed in Appendix D
• Single-family residential subdivisions with 25% or less impervious cover at total site build-out and
not located in one of the watersheds listed in Appendix C and not directly discharging to one of the
303(d) segments listed in Appendix D
• Construction of a barn or other agricultural building, silo, stock yard or pen.
• Structural agricultural conservation practices as identified in Table II in the “Agricultural Best
Management Practice Systems Catalogue” (dated June 2023) that include construction or
reconstruction of impervious area or alter hydrology from pre- to post-development conditions.
The following construction activities that involve soil disturbances between five thousand (5000)
square feet and one (1) acre of land:
• All construction activities located in the New York City Watershed located east of the Hudson River,
see Appendix C Figure 1, that involve soil disturbances between five thousand (5,000) square feet
and one (1) acre of land.
Within the municipal boundaries of NYC:
• Stand-alone road reconstruction, where the total soil disturbance from only that road construction, is
less than one (1) acre of land.
The following construction activities:
• Installation of underground linear utilities; such as gas lines, fiber-optic cable, cable TV,
electric, telephone, sewer mains, and water mains
• Environmental enhancement projects, such as wetland mitigation, stormwater retrofits, stream
restoration, and resiliency projects that reconstruct shoreline areas to address sea level rise
• Pond construction
• Linear bike paths running through areas with vegetative cover, including bike paths surfaced with an
impervious cover
• Cross-country ski trails, walking/hiking trails, and mountain biking trails, including a de minimis
parking lot (maximum 10 spaces total, sized for passenger cars) with 35 feet minimum preservation
of undisturbed area downgradient from the parking lot
• Dam rehabilitation (the structure of the dam itself)
• Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are not part of
residential, commercial, or institutional development;
• Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that include incidental
shoulder or curb work along an existing highway to support construction of the sidewalk, bike path,
or walking path.
64
Page 1057 of 1493
Page 1058
Appendix B
Table 1 (Continued)
CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP
THAT ONLY INCLUDES EROSION AND SEDIMENT CONTROLS
The following construction activities:
• Slope stabilization
• Slope flattening that changes the grade of the site, but does not significantly change the runoff
characteristics
• Spoil areas that will be covered with vegetation
• Vegetated open space (i.e. recreational parks, lawns, meadows, fields, downhill ski trails) that do
not alter hydrology from pre- to post-development conditions
• Athletic fields (natural grass) that do not include the construction or reconstruction of impervious
area and do not alter hydrology from pre- to post-development conditions
• Demolition where vegetation will be established, and no redevelopment activity is planned1
• Installation or replacement of either an overhead electric transmission line or a ski lift tower that
does not include the construction of permanent access roads or parking areas surfaced with
impervious cover.
• Solar array field areas that have tables elevated off the ground, spaced one table width apart, do
not alter hydrology from pre- to post-development conditions, and address water quality volume and
runoff reduction volume by maintaining sheet flow on slopes less than 8%.
• Structural agricultural conservation practices as identified in Table II in the “Agricultural Best
Management Practice Systems Catalogue” (dated June 2023) that do not include construction or
reconstruction of impervious area and do not alter hydrology from pre- to post-development
conditions.
• Temporary access roads, median crossovers, detour roads, lanes, or other temporary impervious
areas that will be restored to pre-construction conditions once the construction activity is complete
(in this context, “temporary” means the impervious area will be in place for two years or less)
• Other construction activities that do not include the construction or reconstruction of impervious
area, and do not alter hydrology from pre- to post-development conditions, and are not listed in
Table 2.
1. If the site is redeveloped in the future, a new eNOI must be submitted.
65
Page 1058 of 1493
Page 1059
Appendix B
Table 2
CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP THAT INCLUDES
POST-CONSTRUCTION STORMWATER MANAGEMENT PRACTICES (SMPS)
The following construction activities:
• Single-family home located in one of the watersheds listed in Appendix C or directly discharging to
one of the 303(d) segments listed in Appendix D
• Single-family home that disturbs five (5) or more acres of land
• Single-family residential subdivisions located in one of the watersheds listed in Appendix C or
directly discharging to one of the 303(d) segments listed in Appendix D
• Single-family residential subdivisions that involve soil disturbances of between one (1) and five (5)
acres of land with greater than 25% impervious cover at total site build-out
• Single-family residential subdivisions that involve soil disturbances of between 20,000 square feet
and one (1) acre of land within the municipal boundaries of NYC with greater than 25% impervious
cover at total site build-out
• Single-family residential subdivisions that involve soil disturbances of five (5) or more acres of land,
and single-family residential subdivisions that involve soil disturbances of less than five (5) acres
that are part of a common plan of development or sale that will ultimately disturb five (5) or more
acres of land
• Multi-family residential developments; includes duplexes, townhomes, condominiums, senior
housing complexes, apartment complexes, and mobile home parks
• Creation of 5,000 square feet or more of impervious area in the municipal boundaries of NYC
• Airports
• Amusement parks
• Breweries, cideries, and wineries, including establishments constructed on agricultural land
• Campgrounds
• Cemeteries that include the construction or reconstruction of impervious area (>5% of disturbed
area) or alter the hydrology from pre- to post-development conditions
• Commercial developments
• Churches and other places of worship
• Construction of a barn or other agricultural building (e.g. silo) that involves soil disturbance greater
than five acres.
• Structural agricultural conservation practices as identified in Table II in the “Agricultural Best
Management Practice Systems Catalogue” (dated June 2023) that involves soil disturbance greater
than five acres and include the construction or reconstruction of impervious area or alter hydrology
from pre- to post-development conditions.
• Facility buildings, including ski lodges, restroom buildings, pumphouses, ski lift terminals, and
maintenance and groomer garages
• Institutional development; includes hospitals, prisons, schools and colleges
• Industrial facilities; includes industrial parks
• Landfills; including creation of landfills or capping landfills.
• Municipal facilities; includes highway garages, transfer stations, office buildings, POTWs, water
treatment plants, and water storage tanks
• Golf courses
• Office complexes
66
Page 1059 of 1493
Page 1060
Appendix B
Table 2 (Continued)
CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP THAT INCLUDES
POST-CONSTRUCTION STORMWATER MANAGEMENT PRACTICES (SMPS)
The following construction activities:
• Permanent laydown yards and equipment storage lots
• Playgrounds that include the construction or reconstruction of impervious area
• Sports complexes
• Racetracks; includes racetracks with earthen (dirt) surfaces
• Road construction or reconstruction, outside the municipal boundaries of NYC
• Road construction within the municipal boundaries of NYC
• Stand-alone road reconstruction, within the municipal boundaries of NYC where the total soil
disturbance from that road reconstruction involves soil disturbance of one (1) acre or more of land
• Parking lot construction or reconstruction (as with all Table 2 bullets, this includes parking lots
constructed as part of the construction activities listed in Table 1, unless a Table 1 bullet specifies
otherwise)
• Athletic fields (natural grass) that include the construction or reconstruction of impervious area
(>5% of disturbed area) or alter the hydrology from pre- to post-development conditions
• Athletic fields with artificial turf
• Permanent access roads, parking areas, substations, compressor stations, and well drilling pads,
surfaced with impervious cover, and constructed as part of an overhead electric transmission line,
wind-power, cell tower, oil or gas well drilling, sewer or water main, ski lift, or other linear utility
project
• Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are part of a
residential, commercial or institutional development
• Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are part of
highway construction or reconstruction
• Solar array field areas on slopes greater than 8% that cannot maintain sheet flow using
management practices identified in the BB or the DM
• Solar array field areas on slopes less than 8% that will alter the hydrology from pre- to post-
development conditions
• Solar array field areas with tables that are not elevated high enough to achieve final stabilization
beneath the tables
• Traditional impervious areas associated with solar development (e.g. roads, buildings,
transformers)
• Utility pads surfaced with impervious cover, including electric vehicle charging stations
• All other construction activities that include the construction or reconstruction of impervious area
or alter the hydrology from pre- to post-development conditions, and are not listed in Table 1
67
Page 1060 of 1493
Page 1061
Appendix C
APPENDIX C – Watersheds Requiring Enhanced Phosphorus Removal
Watersheds where owners or operators of construction activities identified in
Table 2 of Appendix B must prepare a SWPPP that includes SMPs designed in
conformance with the Enhanced Phosphorus Removal Standards included in the
DM technical standard.
• Entire New York City Watershed located east of the Hudson River – Figure 1
• Onondaga Lake Watershed – Figure 2
• Greenwood Lake Watershed – Figure 3
• Oscawana Lake Watershed – Figure 4
• Kinderhook Lake Watershed – Figure 5
68
Page 1061 of 1493
Page 1062
Appendix C
Figure 1 - New York City Watershed East of the Hudson
69
Page 1062 of 1493
Page 1063
Appendix C
Figure 2 - Onondaga Lake Watershed
70
Page 1063 of 1493
Page 1064
Appendix C
Figure 3 - Greenwood Lake Watershed
71
Page 1064 of 1493
Page 1065
Appendix C
Figure 4 - Oscawana Lake Watershed
72
Page 1065 of 1493
Page 1066
Appendix C
Figure 5 - Kinderhook Lake Watershed
73
Page 1066 of 1493
Page 1067
APPENDIX D – Impaired Waterbodies (by Construction Related Pollutants)
List of waterbodies impaired by pollutants related to construction activity, including turbidity,
silt/sediment, and nutrients (e.g. nitrogen, phosphorus). This list is a subset of “The Final New
York State 2018 Section 303(d) List of Impaired Waters Requiring a TMDL” dated June 2020.
County Waterbody Pollutant
Albany Ann Lee (Shakers) Pond, Stump Pond (1201-0096) Phosphorus
Albany Lawsons Lake (1301-0235) Phosphorus
Allegany Amity Lake, Saunders Pond (0403-0054) Phosphorus
Allegany Andover Pond (0403-0056) Phosphorus
Bronx Reservoir No.1/Lake Isle (1702-0075) Phosphorus
Bronx Van Cortlandt Lake (1702-0008) Phosphorus
Broome Blueberry, Laurel Lakes (1404-0033) Phosphorus
Broome Fly Pond, Deer Lake (1404-0038) Phosphorus
Broome Minor Tribs to Lower Susquehanna (0603-0044) Phosphorus
Broome Whitney Point Lake/Reservoir (0602-0004) Phosphorus
Cattaraugus Allegheny River/Reservoir (0201-0023) Phosphorus
Cattaraugus Beaver Lake/Alma Pond (0201-0073) Phosphorus
Cattaraugus Case Lake (0201-0020) Phosphorus
Cattaraugus Linlyco/Club Pond (0201-0035) Phosphorus
Cayuga Duck Lake (0704-0025) Phosphorus
Cayuga Owasco Inlet, Upper, and tribs (0706-0014) Nutrients
Chautauqua Chadakoin River and tribs (0202-0018) Phosphorus
Chautauqua Hulburt/Clymer Pond (0202-0079) Phosphorus
Chautauqua Middle Cassadaga Lake (0202-0002) Phosphorus
Clinton Great Chazy River, Lower, Main Stem (1002-0001) Silt/Sediment
Columbia Robinson Pond (1308-0003) Phosphorus
Cortland Dean Pond (0602-0077) Phosphorus
Dutchess Fallkill Creek (1301-0087) Phosphorus
Dutchess Hillside Lake (1304-0001) Phosphorus
Dutchess Wappingers Lake (1305-0001) Phosphorus
Dutchess Wappingers Lake (1305-0001) Silt/Sediment
Erie Beeman Creek and tribs (0102-0030) Phosphorus
Erie Delaware Park Pond (0101-0026) Phosphorus
Erie Ellicott Creek, Lower, and tribs (0102-0018) Phosphorus
Erie Ellicott Creek, Lower, and tribs (0102-0018) Silt/Sediment
Erie Green Lake (0101-0038) Phosphorus
Erie Little Sister Creek, Lower, and tribs (0104-0045) Phosphorus
Erie Murder Creek, Lower, and tribs (0102-0031) Phosphorus
Page 1067 of 1493
Page 1068
Erie Rush Creek and tribs (0104-0018) Phosphorus
Erie Scajaquada Creek, Lower, and tribs (0101-0023) Phosphorus
Erie Scajaquada Creek, Middle, and tribs (0101-0033) Phosphorus
Erie Scajaquada Creek, Upper, and tribs (0101-0034) Phosphorus
South Branch Smoke Cr, Lower, and tribs
Erie Phosphorus
(0101-0036)
South Branch Smoke Cr, Lower, and tribs
Erie Silt/Sediment
(0101-0036)
Genesee Bigelow Creek and tribs (0402-0016) Phosphorus
Genesee Black Creek, Middle, and minor tribs (0402 0028) Phosphorus
Genesee Black Creek, Upper, and minor tribs (0402-0048) Phosphorus
Genesee Bowen Brook and tribs (0102-0036) Phosphorus
Genesee LeRoy Reservoir (0402-0003) Phosphorus
Genesee Mill Pond (0402-0050) Phosphorus
Genesee Oak Orchard Cr, Upper, and tribs (0301-0014) Phosphorus
Genesee Oatka Creek, Middle, and minor tribs (0402-0031) Phosphorus
Genessee Tonawanda Cr, Middle, Main Stem (0102-0002) Phosphorus
Greene Schoharie Reservoir (1202-0012) Silt/Sediment
Greene Sleepy Hollow Lake (1301-0059) Silt/Sediment
Herkimer Steele Creek tribs (1201-0197) Phosphorus
Herkimer Steele Creek tribs (1201-0197) Silt/Sediment
Kings Hendrix Creek (1701-0006) 18 Nitrogen
Kings Prospect Park Lake (1701-0196) Phosphorus
Lewis Mill Creek/South Branch, and tribs (0801-0200) Nutrients
Livingston Christie Creek and tribs (0402-0060) Phosphorus
Livingston Conesus Lake (0402-0004) Phosphorus
Livingston Mill Creek and minor tribs (0404-0011) Silt/Sediment
Monroe Black Creek, Lower, and minor tribs (0402-0033) Phosphorus
Monroe Buck Pond (0301-0017) Phosphorus
Monroe Cranberry Pond (0301-0016) Phosphorus
Monroe Durand, Eastman Lakes (0302-0037) Phosphorus
Monroe Lake Ontario Shoreline, Western (0301-0069) 9 Phosphorus
Monroe Long Pond (0301-0015) Phosphorus
Monroe Mill Creek and tribs (0302-0025) Phosphorus 2
Monroe Mill Creek/Blue Pond Outlet and tribs (0402-0049) Phosphorus
Monroe Minor Tribs to Irondequoit Bay (0302-0038) Phosphorus
Monroe Rochester Embayment - East (0302-0002) [9] Phosphorus
Monroe Rochester Embayment - West (0301-0068) 9 Phosphorus
Monroe Shipbuilders Creek and tribs (0302-0026) Phosphorus 2
Monroe Thomas Creek/White Brook and tribs (0302-0023) Phosphorus
75
Page 1068 of 1493
Page 1069
Nassau Bannister Creek/Bay (1701-0380) Nitrogen
Nassau Beaver Lake (1702-0152) Phosphorus
Nassau Browswere Bay (1701-0383) Nitrogen
Nassau Camaans Pond (1701-0052) Phosphorus
Nassau East Meadow Brook, Upper, and tribs (1701-0211) Silt/Sediment
Nassau East Rockaway Channel (1701-0381) Nitrogen
Nassau Glen Cove Creek, Lower, and tribs (1702-0146) Silt/Sediment
Nassau Grant Park Pond (1701-0054) Phosphorus
Nassau Hempstead Bay, Broad Channel (1701-0032) Nitrogen
Nassau Hempstead Lake (1701-0015) Phosphorus
Nassau Hewlett Bay (1701-0382) Nitrogen
Nassau Hog Island Channel (1701-0220) Nitrogen
Nassau Massapequa Creek, Upper, and tribs (1701-0174) Phosphorus
Milburn/Parsonage Creeks, Upp, and tribs (1701-
Nassau Phosphorus
0212)
Nassau Reynolds Channel, East (1701-0215) [12] Nitrogen
Nassau Reynolds Channel, West (1701-0216) 12 Nitrogen
Nassau Tidal Tribs to Hempstead Bay (1701-0218) Nitrogen
Nassau Tribs (fresh) to East Bay (1701-0204) Silt/Sediment
Nassau Tribs (fresh) to East Bay (1701-0204) Phosphorus
Nassau Tribs to Smith Pond/Halls Pond (1701-0221) Phosphorus
Nassau Woodmere Channel (1701-0219) Nitrogen
New York Harlem Meer (1702-0103) Phosphorus
New York The Lake in Central Park (1702-0105) Phosphorus
Niagara Bergholtz Creek and tribs (0101-0004) Phosphorus
Niagara Hyde Park Lake (0101-0030) Phosphorus
Niagara Lake Ontario Shoreline, Western (0301-0053) 9 Phosphorus
Niagara Lake Ontario Shoreline, Western (0301-0072) 9 Phosphorus
Oneida Ballou, Nail Creeks (1201-0203) Phosphorus
Nutrients
Onondaga Ley Creek and tribs (0702-0001) 10
(phosphorus)
Nutrients
Onondaga Minor Tribs to Onondaga Lake (0702-0022) 10
(phosphorus)
Onondaga Minor Tribs to Onondaga Lake (0702-0022) 10 Nitrogen (NH3, NO2)
Nutrients
Onondaga Onondaga Creek, Lower (0702-0023) 10
(phosphorus)
Onondaga Onondaga Creek, Lower, and tribs (0702-0023) Turbidity
Onondaga Onondaga Creek, Middle, and tribs (0702-0004) Turbidity
Onondaga Onondaga Creek, Upper, and tribs (0702-0024) Turbidity
Ontario Great Brook and minor tribs (0704-0034) Phosphorus 2
Ontario Great Brook and minor tribs (0704-0034) Silt/Sediment
76
Page 1069 of 1493
Page 1070
Ontario Hemlock Lake Outlet and minor tribs (0402-0013) Phosphorus
Ontario Honeoye Lake (0402-0032) Phosphorus
Orange Brown Pond Reservoir (1303-0013) Phosphorus
Orange Lake Washington (1303-0012) Phosphorus
Orange Minor Tribs to Middle Wallkill (1306-0061) Phosphorus
Orange Monhagen Brook and tribs (1306-0074) Phosphorus
Orange Orange Lake (1301-0008) [16] Phosphorus
Orange Quaker Creek and tribs (1306-0025) Phosphorus
Orange Wallkill River, Middle, Main Stem (1306-0038) Phosphorus
Orange Wallkill River, Upper, and Minor tribs (1306-0017) Phosphorus
Orleans Glenvwood Lake (0301-0041) Phosphorus
Orleans Lake Ontario Shoreline, Western (0301-0070) 9 Phosphorus
Orleans Lake Ontario Shoreline, Western (0301-0071) 9 Phosphorus
Nutrients
Oswego Lake Neatahwanta (0701-0018)
(phosphorus)
Oswego Pleasant Lake (0703-0047) Phosphorus
Putnam Lost Lake, Putnam Lake (1302-0053) Phosphorus
Putnam Minor Tribs to Croton Falls Reservoir (1302-0001) Phosphorus
Queens Bergen Basin (1701-0009) 18 Nitrogen
Jamaica Bay, Eastern, and tribs, Queens (1701-
Queens Nitrogen
0005) 18
Queens Kissena Lake (1702-0258) Phosphorus
Queens Meadow Lake (1702-0030) Phosphorus
Queens Shellbank Basin (1701-0001) 18 Nitrogen
Queens Willow Lake (1702-0031) Phosphorus
Rensselaer Nassau Lake (1310-0001) Phosphorus
Rensselaer Snyders Lake (1301-0043) Phosphorus
Richmond Grassmere Lake/Bradys Pond (1701-0357) Phosphorus
Rockland Congers Lake, Swartout Lake (1501-0019) Phosphorus
Rockland Rockland Lake (1501-0021) Phosphorus
Saratoga Ballston Lake (1101-0036) Phosphorus
Saratoga Dwaas Kill and tribs (1101-0007) Phosphorus
Saratoga Dwaas Kill and tribs (1101-0007) Silt/Sediment
Saratoga Lake Lonely (1101-0034) Phosphorus
Saratoga Round Lake (1101-0060) Phosphorus
Saratoga Tribs to Lake Lonely (1101-0001) Phosphorus
Schenectady Collins Lake (1201-0077) Phosphorus
Schenectady Duane Lake (1311-0006) Phosphorus
Schenectady Lake Mariaville Lake (1201-0113) Phosphorus
Schuyler Cayuta Lake (0603-0005) Phosphorus
77
Page 1070 of 1493
Page 1071
Seneca Reeder Creek and tribs (0705-0074) Phosphorus
St.Lawrence Black Lake Outlet, Black Lake (0906-0001) Phosphorus
St.Lawrence Fish Creek and minor tribs (0906-0026) Phosphorus
Steuben Smith Pond (0502-0012) Phosphorus
Suffolk Agawam Lake (1701-0117) Phosphorus
Suffolk Big/Little Fresh Ponds (1701-0125) Phosphorus
Suffolk Canaan Lake (1701-0018) Phosphorus
Suffolk Canaan Lake (1701-0018) Silt/Sediment
Suffolk Fresh Pond (1701-0241) Phosphorus
Suffolk Great South Bay, East (1701-0039) Nitrogen
Suffolk Great South Bay, Middle (1701-0040) Nitrogen
Suffolk Great South Bay, West (1701-0173) Nitrogen
Suffolk Lake Ronkonkoma (1701-0020) Phosphorus
Suffolk Mattituck/Marratooka Pond (1701-0129) Phosphorus
Suffolk Mill and Seven Ponds (1701-0113) Phosphorus
Suffolk Millers Pond (1702-0013) Phosphorus
Suffolk Moriches Bay, East (1701-0305) Nitrogen
Suffolk Moriches Bay, West (1701-0038) Nitrogen
Suffolk Quantuck Bay (1701-0042) Nitrogen
Suffolk Shinnecock Bay and Inlet (1701-0033) Nitrogen
Suffolk Tidal Tribs to West Moriches Bay (1701-0312) Nitrogen
Sullivan Bodine, Mongomery Lakes (1401-0091) Phosphorus
Sullivan Davies Lake (1402-0047) Phosphorus
Sullivan Evens Lake (1402-0004) Phosphorus
Sullivan Pleasure Lake (1402-0055) Phosphorus
Sullivan Swan Lake (1401-0063) Phosphorus
Tompkins Cayuga Lake, Southern End (0705-0040) Phosphorus
Tompkins Cayuga Lake, Southern End (0705-0040) Silt/Sediment
Ulster Ashokan Reservoir (1307-0004) Silt/Sediment
Ulster Esopus Creek, Lower, Main Stem (1307-0010) [17] Turbidity
Ulster Esopus Creek, Middle, Main Stem (1307-0003) 17 Turbidity
Esopus Creek, Upper, and minor tribs
Ulster Silt/Sediment
(1307-0007)[3]
Ulster Wallkill River, Lower, Main Stem (1306-0027) Phosphorus
Warren Hague Brook and tribs (1006-0006) Silt/Sediment
Warren Huddle/Finkle Brooks and tribs (1006-0003) Silt/Sediment
Warren Indian Brook and tribs (1006-0002) Silt/Sediment
Warren Lake George (1006-0016) and tribs Silt/Sediment
Warren Tribs to Lake George, East Shore (1006-0020) Silt/Sediment
Warren Tribs to Lake George, Lk.George Village (1006-0008) Silt/Sediment
78
Page 1071 of 1493
Page 1072
Washington Wood Cr/Champlain Canal and tribs (1005-0036) Phosphorus
Westchester Lake Katonah (1302-0136) Phosphorus
Westchester Lake Lincolndale (1302-0089) Phosphorus
Westchester Lake Meahagh (1301-0053) Phosphorus
Westchester Lake Mohegan (1301-0149) Phosphorus
Westchester Lake Shenorock (1302-0083) Phosphorus
Westchester Mamaroneck River, Lower (1702-0071) Silt/Sediment
Westchester Mamaroneck River, Upp, & minor tribs (1702-0123) Silt/Sediment
Westchester Saw Mill River (1301-0007) Phosphorus
Westchester Saw Mill River, Middle, and tribs (1301-0100) Phosphorus
Westchester Sheldrake River (1702-0069) Phosphorus
Westchester Sheldrake River (1702-0069) Silt/Sedimnt
Westchester Silver Lake (1702-0040) Phosphorus
Westchester Teatown Lake (1302-0150) Phosphorus
Westchester Truesdale Lake (1302-0054) Phosphorus
Westchester Wallace Pond (1301-0140) Phosphorus
79
Page 1072 of 1493
Page 1073
APPENDIX E – List of NYSDEC Regional Offices
DIVISION OF DIVISION OF WATER
COVERING THE ENVIRONMENTAL
Region (DOW)
FOLLOWING COUNTIES: PERMITS (DEP) WATER (SPDES) PROGRAM
PERMIT ADMINISTRATORS
50 CIRCLE ROAD 50 CIRCLE ROAD
1 NASSAU AND SUFFOLK STONY BROOK, NY 11790 STONY BROOK, NY 11790-3409
TEL. (631) 444-0365 TEL. (631) 444-0405
1 HUNTERS POINT PLAZA, 1 HUNTERS POINT PLAZA,
BRONX, KINGS, NEW YORK, 47-40 21ST ST. 47-40 21ST ST.
2 QUEENS AND RICHMOND LONG ISLAND CITY, NY 11101-5407 LONG ISLAND CITY, NY 11101-5407
TEL. (718) 482-4997 TEL. (718) 482-4933
DUTCHESS, ORANGE, PUTNAM, 21 SOUTH PUTT CORNERS ROAD
220 WHITE PLAINS ROAD, SUITE 110
3 ROCKLAND, SULLIVAN, ULSTER NEW PALTZ, NY 12561-1696
TEL. (914) 428 - 2505
AND WESTCHESTER TEL. (845) 256-3059
ALBANY, COLUMBIA,
DELAWARE, GREENE, 1130 NORTH WESTCOTT ROAD 1130 NORTH WESTCOTT ROAD
4 MONTGOMERY, OTSEGO, SCHENECTADY, NY 12306-2014 SCHENECTADY, NY 12306-2014
RENSSELAER, SCHENECTADY TEL. (518) 357-2069 TEL. (518) 357-2045
AND SCHOHARIE
CLINTON, ESSEX, FRANKLIN,
1115 STATE ROUTE 86, PO BOX 296 232 GOLF COURSE ROAD
FULTON, HAMILTON,
5 SARATOGA, WARREN AND
RAY BROOK, NY 12977-0296 WARRENSBURG, NY 12885-1172
TEL. (518) 897-1234 TEL. (518) 623-1200
WASHINGTON
STATE OFFICE BUILDING STATE OFFICE BUILDING
HERKIMER, JEFFERSON,
317 WASHINGTON STREET 207 GENESEE STREET
6 LEWIS, ONEIDA AND
WATERTOWN, NY 13601-3787 UTICA, NY 13501-2885
ST. LAWRENCE
TEL. (315) 785-2245 TEL. (315) 793-2554
BROOME, CAYUGA,
CHENANGO, CORTLAND, 5786 WIDEWATERS PARKWAY 5786 WIDEWATERS PARKWAY
7 MADISON, ONONDAGA, SYRACUSE, NY 13214-1867 SYRACUSE, NY 13214-1867
OSWEGO, TIOGA AND TEL. (315) 426-7438 TEL. (315) 426-7500
TOMPKINS
CHEMUNG, GENESEE,
LIVINGSTON, MONROE, 6274 EAST AVON-LIMA 6274 EAST AVON-LIMA RD.
ONTARIO, ORLEANS,
8 SCHUYLER, SENECA,
ROADAVON, NY 14414-9519 AVON, NY 14414-9519
TEL. (585) 226-2466 TEL. (585) 226-2466
STEUBEN, WAYNE AND
YATES
ALLEGANY,
700 DELAWARE AVENUE 700 DELAWARE AVENUE
CATTARAUGUS,
9 CHAUTAUQUA, ERIE,
BUFFALO, NY 14209-2999 BUFFALO, NY 14209-2999
TEL. (716) 851-7165 TEL. (716) 851-7070
NIAGARA AND WYOMING
80
Page 1073 of 1493
Page 1074
APPENDIX F – SWPPP Preparer Certification Form
The SWPPP Preparer Certification Form required by this permit begins on the following
page.
81
Page 1074 of 1493
Page 1075
SWPPP Preparer Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and
submitted to NYSDEC electronically.)
Project/Site Name:
eNOI Submission ID:
Owner/Operator Name:
Certification Statement – SWPPP Preparer
I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) has been
prepared in accordance with the requirements of GP-0-25-001. I certify under penalty
of law that the SWPPP and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge
and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
SWPPP Preparer First Name MI SWPPP Preparer Last Name
Signature Date
Revised: January 2025
Page 1075 of 1493
Page 1076
APPENDIX G – MS4 SWPPP Acceptance Form
The MS4 SWPPP Acceptance Form required by this permit begins on the following
page.
83
Page 1076 of 1493
Page 1077
MS4 SWPPP Acceptance Form
for construction activities seeking authorization under the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI
and submitted to NYSDEC electronically.)
I. Project Owner/Operator Information
1. Owner/Operator Name:
2. Contact Person:
3. Street Address:
4. City/State/Zip:
II. Project Site Information
5. Project/Site Name:
6. Street Address:
7. City/State/Zip:
III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance Information
8. SWPPP Reviewed by:
9. Title/Position:
10. Date Final SWPPP Reviewed and Accepted:
IV. Regulated MS4 Information
11. Name of MS4 Operator:
12. MS4 SPDES Permit Identification Number: NYR20A
13. Street Address:
14. City/State/Zip:
15. Telephone Number:
Page 1 of 2
Page 1077 of 1493
Page 1078
MS4 SWPPP Acceptance Form - continued
V. Certification Statement - MS4 Official (principal executive officer or ranking elected official) or
Duly Authorized Representative
I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project
identified in section II. of this form has been reviewed and meets the substantive requirements in the
SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP).
Note: The MS4 Operator, through the acceptance of the SWPPP, assumes no responsibility for the
accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of
the SWPPP by the MS4 Operator does not relieve the owner/operator or their SWPPP preparer of
responsibility or liability for errors or omissions in the plan.
Printed Name1:
Title/Position:
Signature:
Date:
VI. Additional Information
1 Printed name of the principal executive officer or ranking elected official for the MS4 Operator or their
duly authorized representative in accordance with CGP Part VII.J.2.
(NYSDEC - MS4 SWPPP Acceptance Form - January 2025)
Page 2 of 2
Page 1078 of 1493
Page 1079
APPENDIX H – NYCDEP SWPPP Acceptance/Approval Form
The City of New York Department of Environmental Protection (NYCDEP) SWPPP
Acceptance/Approval form required by this permit begins on the following page.
86
Page 1079 of 1493
Page 1080
THE CITY OF NEW YORK
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Bureau of Environmental Planning and Analysis
59-17 Junction Blvd., 9th Floor; Flushing, NY 11373
SWPPP Acceptance/Approval
Application Number:
I. Project Owner/Operator Information
1. Owner/Operator Name:
2. Contact Person:
3. Street Address:
4. City/State/Zip:
II. Project Site Information
5. Project/Site Name:
6. Street Address:
7. City/State/Zip:
III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance/Approval
8. SWPPP Reviewed by:
9. Title/Position: /
10. Date Final SWPPP Reviewed and Accepted:
11. Acceptance/Approval Expiration Date:
IV. Regulated MS4 Information for projects that require coverage under the NY State Pollution
Discharge Elimination System General Permit for Stormwater Discharges from Construction
Activity
12. Name of MS4: CITY OF NEW YORK
13. MS4 SPDES Permit Identification Number: NY-0287890
14. Contact Person:
15. Street Address: 59-17 Junction Blvd. 9th Floor
16. City/State/Zip: Flushing, NY 11373
17. Telephone Number:
Projects in the MS4 area must submit a copy of this SWPPP Acceptance with a Notice of
Intent for coverage under the NY SPDES General Permit for Stormwater Discharges from
Construction Activity to: NYS Department of Environmental Conservation, Division of Water;
625 Broadway, 4th Floor; Albany, New York 12233-3505.
Page 1080 of 1493
Page 1 Of 2
Page 1081
THE CITY OF NEW YORK
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Bureau of Environmental Planning and Analysis
59-17 Junction Blvd., 9th Floor; Flushing, NY 11373
V. Certification Statement - MS4 Official (principal executive officer or ranking elected official) or
Duly Authorized Representative
I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project identified
in question 5 has been reviewed and meets the substantive requirements in the SPDES General Permit For
Stormwater Discharges from Municipal Separate Storm Sewer Systems (MS4s).
Note: The MS4, through the acceptance of the SWPPP, assumes no responsibility for the accuracy and adequacy of
the design included in the SWPPP. In addition, review and acceptance of the SWPPP by the MS4 does not
relieve the owner/operator or their SWPPP preparer of responsibility or liability for errors or omissions in the plan.
Printed Name:
Title/Position:
Signature:
Date:
VI. Conditions of Acceptance/Approval and Additional Information
Projects in the MS4 area must submit a copy of this SWPPP Acceptance with a Notice of
Intent for coverage under the NY SPDES General Permit for Stormwater Discharges from
Construction Activity to: NYS Department of Environmental Conservation, Division of Water;
625 Broadway, 4th Floor; Albany, New York 12233-3505.
Page 1081 of 1493
Page 2 Of 2
Page 1082
APPENDIX I – MS4 No Jurisdiction Form
The MS4 No Jurisdiction Form required by this permit begins on the following page.
89
Page 1082 of 1493
Page 1083
MS4 No Jurisdiction Form
for construction activities seeking authorization under the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and submitted to NYSDEC
electronically.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. eNOI Submission ID:
III. Traditional Land Use Control MS4 Operator Information
a. Name of MS4 Operator:
b. MS4 SPDES Permit ID Number: NYR20A
c. Street Address:
d. City/State/Zip:
e. Telephone Number:
IV. Certification Statement
In accordance with CGP Part I.D.2.b.ii.3., I hereby certify that the Traditional Land Use Control MS4
Operator identified in section III. of this form does not have review authority over the construction
project identified in section II. of this form, which is owned/operated by the entity identified in section I.
of this form. I am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations.
a. Printed name of the principal executive officer or ranking elected official for the MS4 Operator or
their duly authorized representative in accordance with CGP Part VII.J.2.:
b. Title/Position:
c. Signature:
d. Date:
Page 1083 of 1493
Page 1084
APPENDIX J – Owner/Operator Certification Form
The Owner/Operator Certification Form required by this permit begins on the following
page.
91
Page 1084 of 1493
Page 1085
Owner/Operator Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b. or Part I.F.2. and 3., the completed form must be attached to the eNOI or the
Request to Continue Coverage, and submitted to NYSDEC electronically.
Project/Site Name: ________________________________________________________
eNOI Submission ID: _________________________________________________
eNOI Submitted by: Owner/Operator SWPPP Preparer Other
Certification Statement - Owner/Operator
I hereby certify that I read, and will comply with, the GP-0-25-001 permit requirements. I understand that
authorization to discharge under the permit for the project/site named above is dependent on receipt of a
Letter of Authorization (LOA) or a Letter of Continued Coverage (LOCC) from the New York State
Department of Environmental Conservation (NYSDEC) in accordance with CGP Part I.D.3.b. or Part I.F.4.
I am aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.
Owner/Operator First Name MI Owner/Operator Last Name
___________________________________________________________
Signature
________________________________
Date
Revised: January 2025
Page 1085 of 1493
Page 1086
Appendix F
Forms
Page 1086 of 1493
Page 1087
STORM WATER POLLUTION PREVENTION PLAN
CONTRACTOR’S CERTIFICATION STATEMENT
Multifamily Development – 1425 & 1475 Orchard Park Road
CONTRACTOR'S CERTIFICATION:
“I certify under penalty of law that I understand and agree to comply with the terms and conditions of the SWPPP
for the construction site identified in such SWPPP as a condition of authorization to discharge storm water. I also
understand that the operator must comply with the terms and conditions of the New York State Pollutant
Discharge Elimination System (SPDES) general permit for storm water discharges from construction activities and
that it is unlawful for any person to cause or contribute to a violation of water quality standards.”
Note: The contractor shall have at least one NYSDEC trained individual onsite at all times when earthwork and
other SWPPP associated work is being performed from each contractor(s) and subcontractor(s). Each contractor(s)
and subcontractor(s) shall provide copies of these individuals’ certifications to the Town of West Seneca.
Name:
(Print)
Signature:
Title:
Company Name:
Address: ___________________________________
Telephone Number: __________________________
Date: ______________________________________
Scope of Services:
Trained Individual(s) Responsible for Implementation: __________________________________________
This form must be signed by a responsible corporate officer or other party meeting the
“Signatory Requirements” of the NYSDEC SPDES General Permit
Page 1087 of 1493
Page 1088
Owner/Operator Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b. or Part I.F.2. and 3., the completed form must be attached to the eNOI or the
Request to Continue Coverage, and submitted to NYSDEC electronically.
Multifamily Development
Project/Site Name: ________________________________________________________
HQN-V818-KWDXZ
eNOI Submission ID: _________________________________________________
eNOI Submitted by: Owner/Operator ✔ SWPPP Preparer Other
Certification Statement - Owner/Operator
I hereby certify that I read, and will comply with, the GP-0-25-001 permit requirements. I understand that
authorization to discharge under the permit for the project/site named above is dependent on receipt of a
Letter of Authorization (LOA) or a Letter of Continued Coverage (LOCC) from the New York State
Department of Environmental Conservation (NYSDEC) in accordance with CGP Part I.D.3.b. or Part I.F.4.
I am aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.
Brian Hillery
Owner/Operator First Name MI Owner/Operator Last Name
___________________________________________________________
Signature
________________________________
Date
Revised: January 2025
Page 1088 of 1493
Page 1089
SWPPP Preparer Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and
submitted to NYSDEC electronically.)
Project/Site Name: Multifamily Development
eNOI Submission ID: HQN-V818-KWDXZ
Brian Hillery & William Sahlem
Owner/Operator Name:
Certification Statement – SWPPP Preparer
I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) has been
prepared in accordance with the requirements of GP-0-25-001. I certify under penalty
of law that the SWPPP and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge
and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
Anthony J Pandolfe
SWPPP Preparer First Name MI SWPPP Preparer Last Name
5/26/26
Signature Date
Revised: January 2025
Page 1089 of 1493
Page 1090
Appendix G
NYSDEC Notice of Termination (NOT)
Page 1090 of 1493
Page 1091
eNOT MS4 Acceptance
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Traditional Land Use Control MS4 Operator Information
a. Name of MS4 Operator:
b. MS4 SPDES Permit ID Number: NYR20A
c. Street Address:
d. City/State/Zip:
e. Telephone Number:
IV. Certification Statement
I have determined that it is acceptable for the owner or operator of the construction project identified
above to submit the electronic Notice of Termination in accordance with CGP Part V. I certify under
penalty of law that this document and all attachments were prepared under my direction or supervision
in accordance with a system designed to assure that qualified personnel properly gather and evaluate
the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations.
a. Printed name of the principal executive officer or ranking elected official for the MS4 Operator or
their duly authorized representative in accordance with CGP Part VII.J.2.:
b. Title/Position:
c. Signature:
d. Date:
Page 1091 of 1493
Page 1092
eNOT Owner or Operator Certification
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I certify that I have met the requirements of CGP Part V.A.1., 2., 3., and 4. I certify under
penalty of law that this document and all attachments were prepared under my direction
or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for
knowing violations.
a. Printed name of the Owner or Operator:
b. Title/Position:
c. Signature:
d. Date:
Page 1092 of 1493
Page 1093
eNOT Qualified Inspector Certification – Final Stabilization
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.i., ii., and iii. or CGP Part
V.A.1.b.i., ii., and iii. have been achieved. I certify under penalty of law that this
document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting
false information, including the possibility of fine and imprisonment for knowing
violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 1093 of 1493
Page 1094
eNOT Qualified Inspector Certification – SMPs
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.iv. or CGP Part V.A.1.b.iv.
have been achieved. I certify under penalty of law that this document and all
attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 1094 of 1493
Page 1095
Appendix H
Construction Documents
Page 1095 of 1493
Page 1096
Page 1096 of 1493
Page 1097
Page 1097 of 1493
Page 1098
Page 1098 of 1493
Page 1099
Page 1099 of 1493
Page 1100
Page 1100 of 1493
Page 1101
Page 1101 of 1493
Page 1102
Page 1102 of 1493
Page 1103
Page 1103 of 1493
Page 1104
Page 1104 of 1493
Page 1105
Page 1105 of 1493
Page 1106
Page 1106 of 1493
Page 1107
Page 1107 of 1493
Page 1108
Page 1108 of 1493
Page 1109
Page 1109 of 1493
Page 1110
Page 1110 of 1493
Page 1111
Page 1111 of 1493
Page 1112
Page 1112 of 1493
Page 1113
Page 1113 of 1493
Page 1114
Page 1114 of 1493
Page 1115
Page 1115 of 1493
Page 1116
Page 1116 of 1493
Page 1117
Page 1117 of 1493
Page 1118
Page 1118 of 1493
Page 1119
Appendix I
Standard Erosion Control Details
Page 1119 of 1493
Page 1120
Page 1120 of 1493
Page 1121
Page 1121 of 1493
Page 1122
Page 1122 of 1493
Page 1123
Page 1123 of 1493
Page 1124
Page 1124 of 1493
Page 1125
Page 1125 of 1493
Page 1126
Page 1126 of 1493
Page 1127
Page 1127 of 1493
Page 1128
Page 1128 of 1493
Page 1129
Appendix J
Wetland Delineation Figure: by LaBella
Page 1129 of 1493
Page 1130
Or
c
ha
rd
Brian Hillary
Pa
r
kR
Creator: ASM Reviewer: LD
Wetland and Stream
d
Nh
Delineation Report
1475 Orchard
St
at
e
Park Road
Rt
e
Orchard Park, NY
24
0
Wetland 1 Retention Pond
Swale 1
PSS PuB
Ephemeral
Wetland continues off-site
0 62.5 125 Feet
UPV-1 Culvert d
eR
erv 1 inch = 125 feet
Culvert Res
Legend
W1-5 Culvert Study Area
Bridge Data Point Location
W1-10
Wetland/Stream Flag Location
Culvert Culvert/Bridge
WET1-A
Scrub-Shrub Wetland (PSS)
Swale 2
UPL1-A Retention Pond
W1-15
Ephemeral
Ephemeral Stream
Culvert Area
Approximate Offsite Wetland/
Stream Boundary
Stream Flow Direction
W1-20 UPV-2 Road
W1-40
Soil
DbA
RfB
W1-35
WET1-B
UPL1-B
W1-30 W1-45
W1-25
Wetland continues off-site
Sources:
1. Study Area: Created by LaBella using information
Rd
provided by the client.
gr
2. Basemap: Esri, DigitalGloce, GeoEye, Earthstar,
Be
Geographics, CNES/Airbus DS, USDA, USGS
Notes: AeroGRID, IGN, and GIS User Community, 2023.
3. Mapped soil data were obtained from the NRCS
1) Wetland/stream delineation flag locations were online Soil Data (soildatamart.nrcs.usda.gov).
surveyed using a sub-foot GPS unit.
2) All areas outside of the wetlands/stream delineated
within the Project Site are considered to be upland. Approximate
3) Only select wetland/stream flag locations are labeled. Approximate NYSDEC RfA Stream Wetland and Stream
4) All wetland/stream boundaries and jurisdictions Cowardin Area within Stream
Wetland- ID Classification Waterbody Length Delineation Survey
are subject to verification by NYSDEC/USACE. Name
Classification Study Area Classification within Study
(acres) Area (lf)
All features are pending a USACE Jurisdictional Review FIGURE 5
4
and NYSDEC Jurisdictional Review under the revised Wetland 1 PSS 5.60 Swale 1 Ephemeral Unclassified 515
NYSDEC Freshwater Wetland Regulations. Retention Pond PuB 0.03 Swale 2 Ephemeral Unclassified 190
LaBella Project No: 2251287
Path: B:\GLOBAL\Projects\Hillary, Brian\2251287 - 1475 Orchard Park Road
Date: 3/27/2025
Page 1130 of 1493
Page 1131
Appendix K
OPRHP Clearance Letter
Page 1131 of 1493
Page 1132
KATHY HOCHUL ERIK KULLESEID
Governor Commissioner
January 29, 2024
Jeffrey Schieber
Town of West Seneca
1250 Union Rd
West Seneca, NY 14224
Re: DEC
Multi-Family Residential New Development
1425 Orchard Park Rd, Buffalo, NY 14224
23PR10321
Dear Jeffrey Schieber:
Thank you for requesting the comments of the Division for Historic Preservation of the Office of
Parks, Recreation and Historic Preservation (OPRHP). We have reviewed the submitted
materials in accordance with the New York State Historic Preservation Act of 1980 (section
14.09 of the New York Parks, Recreation and Historic Preservation Law). These comments are
those of the Division for Historic Preservation and relate only to Historic/Cultural resources.
They do not include potential environmental impacts to New York State Parkland that may be
involved in or near your project.
The Archaeology Unit has reviewed the Phase IA/IB Archaeological Survey Report prepared for
this project (24SR00034; January 2024). No archaeological sites were identified by the survey
and the OPRHP concurs with the report recommendation that no additional archaeological work
is necessary.
Please note that these comments pertain only to archaeological resources. Please continue to
consult with our Survey and National Register Unit. If you have any questions concerning
archaeology, I can be reached at [email protected].
Sincerely,
Sydney Snyder
Scientist - Archaeology
New York State Office of Parks, Recreation and Historic Preservation
Division for Historic Preservation, Peebles Island, PO Box 189, Waterford, New York 12188-0189
(518) 237-8643 • https://parks.ny.gov/shpo
Page 1132 of 1493
Page 1133
Appendix L
NYSDEC Stormwater Management Inspection Lists
Page 1133 of 1493
Page 1134
New York State Stormwater Management Design Manual Appendix G
Bioretention Operation, Maintenance and
Management Inspection Checklist
Project:
Location:
Site Status:
Date:
Time:
Inspector:
MAINTENANCE ITEM SATISFACTORY /
COMMENTS
UNSATISFACTORY
1. Debris Cleanout (Monthly)
Bioretention and contributing areas
clean of debris
No dumping of yard wastes into
practice
Litter (branches, etc.) have been
removed
2. Vegetation (Monthly)
Plant height not less than design
water depth
Fertilized per specifications
Plant composition according to
approved plans
No placement of inappropriate plants
Grass height not greater than 6 inches
No evidence of erosion
3. Check Dams/Energy Dissipaters/Sumps (Annual, After Major Storms)
No evidence of sediment buildup
G-10
Page 1134 of 1493
Page 1135
New York State Stormwater Management Design Manual Appendix G
MAINTENANCE ITEM SATISFACTORY /
COMMENTS
UNSATISFACTORY
Sumps should not be more than 50%
full of sediment
No evidence of erosion at downstream
toe of drop structure
4. Dewatering (Monthly)
Dewaters between storms
No evidence of standing water
5. Sediment Deposition (Annual)
Swale clean of sediments
Sediments should not be > 20% of
swale design depth
6. Outlet/Overflow Spillway (Annual, After Major Storms)
Good condition, no need for repair
No evidence of erosion
No evidence of any blockages
7. Integrity of Filter Bed (Annual)
Filter bed has not been blocked or
filled inappropriately
G-11
Page 1135 of 1493
Page 1136
New York State Stormwater Management Design Manual Appendix G
Comments:
Actions to be Taken:
G-12
Page 1136 of 1493
Page 1137
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, New York
AGENCIES UTILITIES
OWNER/DEVELOPER
Name: Brian Hillery & William Sahlem
Address: 1 Woodthrush Trail
Orchard Park
Telephone: (716) 512-3425
LOCATION MAP
NOT TO SCALE
80 Silo City Row 111 Bain Street, Suite 332
Buffalo, New York 14203 Greensboro, North Carolina 27406
Phone: (716) 842-3165 Phone: (336) 937-9009
DESIGN CONSULTANTS
May 2026
Revised June 2026
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, New York
Page 1137 of 1493
Page 1138
MH
PREPARED FOR:
RIM:676.70
NW. INV:688.25 (12")
SE. INV:668.09 (12")
BRIAN HILLARY &
WILLIAM SAHLEM
1 WOODTHRUSH TRAIL
EX. PIN ORCHARD PARK
NEW YORK 14127
APPROX. LOCATION
682
CB
S.
SW
" RIM:680.53
M 8'-
32
.L
.& N. INV:671.23 (18")
EX 25' N .
D -5 683
IN
' 0°
5. 32' E
6 S. INV:671.23 (18")
.N .
E
.5 5 10
0.
3 52 67
W
680
AI
21
I LL
L
87°-09'-45"
8 .0
IE
PROJECT:
PA
684
TH L-8
RA
4'
E
LL
W 3 70,
CB
D.
. T
EL
HA P
LO
MS
RIM:683.34
T. 1425 & 1475 ORCHARD PARK ROAD,
&
W
LE -31
BI 68 5 N. INV:672.94 (18")
&
/S
D.
M
IN 9
S. INV:673.10 (18") TOWN OF WEST SENECA,
W
C.
'
S.
. 00
.L
68 0 COUNTY OF EIRE,
IN PAR
0
1.0
20 686
PP .
E
STATE OF NEW YORK
'E
OR K R
12"
EX. REBAR
CH OA
4.11' N.
AR D
23
MH
687
N
D
RIM:685.89
O
AY BEING PART OF
7 .6
TI
EW
CA
NW. INV:676.14 (12")
680
CO 9.8'
V LOTS 369 & 417, TOWNSHIP 10 RANGE 7
RI
2'
67 5
LO
SE 1142
D SE. INV:676.22 (12")
683
113°-18'-53"
NC
T.
L-
E BUFFALO CREEK RESERVATION
. C 0,
BI
D.
X.
ON
5
.P
O
7" ST
OR P-5
PR
AD
&
12"
.H 3
AP
671 .0'
MS
CB SBL No. 143.19-1-8 & 143.19-1-9
ILL
L-11420 23
ER
EX. PIN RIM:685.39 & 152.07-1-1
. 0
Y
N. INV:677.49 (18")
P-53
&
PP 8' E.
W. LINE HILERY& SAHLEM
S. INV:677.49 (16")
SA
180.00' D. & MS.
672
.
E. INV:676.99 (4")
HL
691
EM
EX 89' N
5. /L
.R .
±O
685
4.18' MS.
EB
2 12" 7"
AR
67
OR
NE 1144
10" & SAHLEM
S. LINE HILLERY
L-
PP
. C 2,
L-11420, P-53 1.0' E.
OR P-8 143
N
CH
MS. S. LINE CICHO
0 ' D. & 794.95'
. H 36
4
12.0 CH. = 792.0 L-11283, P-375 694
ILL
660.00' D. = 656.13' MS. 3 PP
67
ER
AR
EX. IP.
Y
11
&
5
PP
TER'S CHURCH 7.27' NW.
°-0
.86
' MS.
SA
NW. COR. LOT 417 90°-59'-13" N. LINE ST. PE
263.56
4'-
PARKING
'M
HL
D
S.
1
L-139, P-466
670
69
47
0' M
EM
S.
LOT
S. LINE LOT 369
.0
"
4
S. LINE LOT 369
692
9
105
3
69
PA
68
69
0
663
68 8
69
12"
5
EX. IP. 7 A
5
N. LINE LOT 417 RE PO Box 207
6
66
69
EX. IP. EX. PIN
66
.A
66
RK
N. INV: 660.98 (18" HDPE) 9.68' E. 3.77' N.
W. INV: 682.97 BIT Sanborn, New York 14132
12" (12" HDPE) 170°-37'-13"
89°-57'-36" PHONE: (716) 587-8380
668
HYD
2
4.05' W. APPROX. LOCATION
68
68 0 FAX: 716.587.8379
669
OF CEMETERY ST
RO
6" HEAD STONES NOT WEBSITE: www.360landsurvey.com
NE. INV: 680.89 (6" HDPE)
LOCATED 127°-49'-44"
NE A S S 7, P
AD
14"
W 332
28" 30"
. C MA -87
L-
40" 14"
OR N
MS.
674
18" EX. IP.
.
91
(6
4 NW. INV: 673.14 (12" CMP) 7"
66
°-4
. 00'
CL
4'-
6.0
ST
44
23"
15 0
"
SW. INV: 680.34 (6" HDPE)
12"
')
W. INV: 680.32 (6" HDPE)
SE. INV: 673.26 (12" CMP) 30" PARKING
68 7
S. INV: 662.31 (18" HDPE) LOT
16"
6 75
SW
34"
670
16
68 6
.L
EX. IP. E. INV: 680.75 (6" PVC)
7. 4
IN
65
.
6
683
O/L MS
3'
67 2
E
6 18"
68 PART OF .&
D
OR
1
4
146°-28'-21"
.&
'D
W. LINE LOT 417
68
68
.7 1
C
19" L-11442, P-836
5
MS
HA
9
68
29
77
.
RD
6 0
PA
68 TOTAL AREA =
RK
8 5 .0
RO
16.59 AC.
AD
NW. COR.
0' MS
WASSMAN 38"
VERIFIED NYSDEC WETLAND
PART OF 30" EXCEPTION
537.24' D. & MS.
8
69 0
.
100-FOOT ADJACENT AREA 149°-26'-50"
67
L-3327
EXCEPTING & RESERVING
11"
(APPROXIMATE LOCATION)
L-11442 10 24" EX. IP. P-87
HIGHWAY PURPOSES
PARKING
666
3. 2.04' NW.
60' WIDE STRIP FOR
P-836 LOT 00
'D
.&
PARCEL "A" M
S.
SCRUB SHRUB WETLANDS (PSS) 90 36"
33
(APPROXIMATE LOCATION) .0 5 8.
0 153°-18'-56"
"
0'
69
14"
10
'M D.
6'-
6
&
9
S.
°-4
7
24"
66
M
67
66
S.
89
8"
S.
M
&
D.
675
66 8
S.
113°-43'-57"
0'
'M
M 9'
0.
S.
. & .3
18"
20
00
D 51
0
0
3.
1
70
68
11
669
5" 2 00
T
. 00'
ND
32"
MS.
RA
S.
681
M
.B
.&
NE
'D
670
EX. REBAR
LI
682
S.
96
N.
M
7.
EXCEPTION
26
.&
'D
8" 12" 11"
O/L
L-3036
70
LC
2.
12" 6" 8"
671
12"
70 S.
M '
26
. & 00
7"
P-217
S.
D 75.
'M
20" 6"
M '
4
. & 89
3
S.
68
70
6" 12"
D 72.
6" 13"
9.
72 6"
14
6
')
EX. IP.
0
5
68
133°-32'-58"
0
12.33' W.
0.
67
673 5
69
(7
EX. IP.
3.20' S.
NW. COR. BRANDT 275.56' D. & MS.
674
AD
87°-23'-54" N. LINE ULRICH
700 705 L-3036, P-217 710
L-1120, P-212
RO
675 6
NW COR. ULRICH
L-1120, P-212 20" 68
7
8
68 68
9
695
68
N. INV: 669.78 (18" HDPE)
RG
676
683
684
685
1
113°-18'-53"
682
68
0 1190.00' MS.
BE
677 68
678 679 1510.08' D. = 1514.03' MS.
AD
RO
RG
BE
E
IN
.L
NW
1 SANITARY MH INFORMATION 4/29/2026
REV. NOTE DATE
UNAUTHORIZED ALTERATION OR ADDITION
TO THIS SURVEY MAP IS A VIOLATION OF
SECTION 7209. PROVISION 2 OF THE NEW
YORK STATE EDUCATION LAW.
0" 1" 2"
BITUMINOUS BIT. EAST E. PAVEMENT EDGE PE SHEET SCALE BAR
ADJUST ACCORDINGLY IF SCALE
BUILDING
ELEVATION ELEV POWER POLE PP IS NOT TWO INCHES
DRAWING NAME
BLDG.EXISTING EX. POLYVINYL CHLORIDE PVC
CATCH BASIN FENCE FNC.
SANITARY SEWER SMH
GENERAL NOTES: CONCRETE CONC. FIRE HYDRANT MAN HOLE
2"
1. THIS SURVEY WAS PREPARED FROM A FIELD SURVEY BY 360 LAND SURVEY, DPC. ON FEBRUARY 27, 2026. CONIFEROUS TREE W/ HIGH-DENSITY HPDE SOUTH S.
DIAMETER POLYETHYLENE
2. HORIZONTAL DATUM: NORTH AMERICAN DATUM OF 1983 (NAD83), ESTABLISHED WITH GPS USING THE NEW YORK STATE
DEPARTMENT OF TRANSPORTATION REAL TIME NETWORK (NYSDOT RTN). (US SURVEY FEET) .
CORRUGATED METAL PIPE CMP
2"
IRON PIPE
SPOT ELEVATION
STORY STY.
TOPOGRAPHIC
DECIDUOUS TREE W/ INVERT INV.
3. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), ESTABLISHED WITH GPS USING THE NEW YORK STATE DIAMETER
NORTH N.
WATER VALVE
WEST
WV
W.
SURVEY
DEPARTMENT OF TRANSPORTATION REAL TIME NETWORK (NYSDOT RTN). (US SURVEY FEET).
MAJOR CONTOUR LINE (5') XXX PROPERTY LINE TREE
WITH LINE W/
4. UTILITY INFORMATION SHOWN ON THIS MAP IS FROM VISIBLE FIELD EVIDENCE AT THE TIME OF FIELD SURVEY, FIELD MARKOUTS BY
MINOR CONTOUR LINE (1') XXX OVERHEAD ELECTRIC LINE OE UNDERGROUND
UTILITY COMPANIES, AND INFORMATION PROVIDED BY A 811 DESIGN TICKET. COM R
COMMUNICATIONS
FENCE LINE (AS NOTED) SANITARY STORM SA
5. WETLANDS INFORMATION TAKEN FROM A WETLAND AND STREAM DELINEATION SURVEY COMPLETE BY LABELLA, PROJECT No: UNDERGROUND UE
GAS LINE G STORM SEWER LINE ST
ELECTRIC
2251287 DATE: 12/1/2025. PROJ. NO. 26-040 SCALE 1"=60'
WATER LINE WV PTH 3/17/2026
Know what's below.
CREW DATE
SCRUB SHRUB WETLAND (PSS) VERIFIED NYSDEC WETLAND
CEMETERY LIMITS
100-FOOT ADJACENT AREA DWN. AJM CHK. CJS
TOPOGRAPHIC SURVEY LIMITS Call before you dig. DRAWING NUMBER
SHEET 1 OF 1
Page 1138 of 1493
Page 1139
EX. PIN CB
UE
RIM:683.34
G
APPROX. LOCATION
TOPSOIL STOCKPILE
W
682 N. INV:672.94 (18")
ST
W/ SILT FENCE S. INV:673.10 (18")
SA
CB
OE
" RIM:680.53
32
UE
8'- N. INV:671.23 (18")
EX 5' N .ST
CB
°-5 683
G
5.2 32' E OE
0 S. INV:671.23 (18")
.N .
SILT FENCE/SILT SOCK 5 10 RIM:685.39
0W.
67 680
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
AI
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
(LIMIT OF DISTURBANCE) N. INV:677.49 (18")
L
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
87°-09'-45" S. INV:677.49 (16")
Greensboro
684 E. INV:676.99 (4")
UE
SA G
UE
OR
T MH
LO
W
CONCRETE IT. RIM:685.89
B 685 NW. INV:676.14 (12")
UE
C
WASHOUT PIT
SE. INV:676.22 (12")
UE
680
HA
1.0
686
PP .
G OE
SW
SA
'E
T
UE
12"
EX. REBAR
R
4.11' N.
Utica
687
D
N
UE
O
AY
TI
EX. TREE TO BE EW
STABILIZED
X. UE
CA
680
CO
IV
G E
PA
CONSTRUCTION
675
REMOVED (TYP.) DR
LO
O
683
W
NC
113°-18'-53" T.
BI ENTRANCE ONE
59
.P
O
7" ST
.8'
SA S
PR
AD
RK
UE
UE
12"
Buffalo
CONSTRUCTION TRAILER
AP
671 .0'
T
L-11420 OFFICE IF NEEDED 23
G E
EX. PIN
O
W
RO
EX. CONCRETE PAD AND
P-53
UE
PP 8' E.SA GSW
672 DRIVEWAY TO BE REMOVED
0.
UE
EX. TREE TO BE
691
AD
EX. TREES TO BE CLEARED. REFER REMOVED (TYP.)
EX 9' N
OE
UE
5.8 /L
.R .
T
TO SITE PLAN C-100 FOR LIMITS.
±O
685
EB
2 7"
(6
12"
AR
UE
67
D A
AN E ARE
10"
UE
6.0
AREA OF DISTURBANCE EX. SITE TO BE CLEARED AND T
= 7.42 AC. EN AG
GRUBBED WITHIN DISTURBANCE IPM STOR
SA SOE
U
LIMITS AS SHOWN EQ IAL
')
OE 694
UE
TER
UE
PP
G
T
3 OE PP
67 MA OE
OE 1.0' E.
W
OE EX. IP.
14
11
INSTALL PROPOSED DETENTION BASIN DURING INITIAL PHASE INSTALL ORANGE MESH PROTECTIVE OE
3 .8
5
PP 7.27' NW.
°-0
NW. COR. LOT 417 FENCING AROUND CEMETERY
OF CONSTRUCTION TO ACT AS SEDIMENT BASIN. CLEAN TO
6'
UE
4'- SA W
PARKING
1
OE
MS
6 70
DURING CONSTRUCTION.
Multifamily Development
DESIGN GRADE FOLLOWING STABILIZATION. INSTALL
69
47
LOT
OE
.
S. LINE LOT 369
"
4
G
692
BIORETENTION SOIL AFTER SITE HAS BEEN STABILIZED. CONTRACTOR TO SUBMIT SHOP
9
3
69
68
69
0
W
ST
663 DRAWING PRIOR TO CONSTRUCTION
688
69
12"
UE
5
EX. IP. 7 A
5
RE
66
6
69
OE
66
.A
66
N. INV: 660.98 (18" HDPE) BIT
675 12" 170°-37'-13"
OE
89°-57'-36" 674
668
673 HYD
2
672 APPROX. LOCATION
68
671
680 EX. TREES TO BE REMOVED
669
WG
670 OF CEMETERY
SA S
UE
6" HEAD STONES NOT NE. INV: 680.89 (6" HDPE)
LOCATED
T OE
673.50
127°-49'-44"
673.50
14"
28" 30"
40" 14"
674
UE
18" EX. IP.
W. INV: 682.97 NOTE: STUMPS AND BRUSH MAY NOT
4 NW. INV: 673.14 (12" CMP) 7" EX. TREE TO BE BE BURIED IN THE TOWN AND
66
(12" HDPE)
ST
REMOVED (TYP.) TOPSOIL MAY NOT BE REMOVED FROM
EX. 6" PIPE TO
23" UE EX. 12" PIPE TO THE WORK SITE WITHOUT A PERMIT
BE REMOVED
1425 & 1475 Orchard Park Rd
COM
BE REMOVED SW. INV: 680.34 (6" HDPE)
12" W. INV: 680.32 (6" HDPE)
SE. INV: 673.26 (12" CMP) 30" PARKING
687
S. INV: 662.31 (18" HDPE) LOT
16"
75
UE
670 6 34"
686
EX. IP. E. INV: 680.75 (6" PVC)
MATERIAL STORAGE AREA
5 6 MS
.
683
O/L
66 67 18"
68
2 PART OF &
1
D.
4
EQUIPMENT AND
146°-28'-21"
68
W. LINE LOT 417
1'
68
UE
19" L-11442, P-836 9.7
5
© CARMINA WOOD DESIGN
68
29
7
West Seneca, NY
67 0
68 TOTAL AREA =
UE
TOPSOIL STOCKPILE
16.59 AC. W/ SILT FENCE
38"
UE
PART OF EXCEPTION
COM
30"
8
690
149°-26'-50"
67
11" L-3327
L-11442 10 24" EX. IP. P-87
PARKING
666
3. 2.04' NW.
P-836
UE
LOT 00
'D
.&
PARCEL "A" M
S.
SCRUB SHRUB WETLANDS (PSS) SILT FENCE/SILT SOCK 36"
33
(LIMIT OF DISTURBANCE) EX. SITE TO BE CLEARED AND
UE
(APPROXIMATE LOCATION) 153°-18'-56" 5 8.
"
0'
69
14"
10
6/15/26
GRUBBED WITHIN DISTURBANCE D
6'-
.&
6
9
°-4
LIMITS AS SHOWN
7
24"
66
M
Date
67
66
S.
89
8"
UE
675
668
S.
113°-43'-57"
'M
18"
00
0
0
3.
Per Engineering comments
70
68
11
UE
669
COM
5"
T
ND
32"
RA
681
.B
UE
EX. TREE TO BE
NE
670
EX. REBAR
No. Description
LI
REMOVED (TYP.)
682
S.
N.
M
EXCEPTION
.&
'D
12"
REVISIONS:
8" 11"
O/L
L-3036
70
2.
12" 6" 8"
671
12"
26
7" P-217
20" 6"
& 89'
4
3
S.
1
68
70
6" 12"
D. 72.
M
6" 13"
2 6"
67
')
.0
EX. IP.
5
68
133°-32'-58"
COM 670
12.33' W.
0
673 5
69
(7
EX. IP.
3.20' S.
275.56' D. & MS.
AD
674 700 710
87°-23'-54" 705
RO
675 6
20" 68
7
8
68 9
68 695
68
N. INV: 669.78 (18" HDPE)
RG
676
683
1
68
BE
EROSION CONTROL NOTES
NOTES:
THE FOLLOWING EROSION CONTROL PROCEDURES SHALL BE ADHERED TO BY THE CONTRACTOR:
1. INSTALL TEMPORARY SILT FENCE BARRIERS AS DIRECTED BY THE OWNER AND AT ALL EXISTING STORMWATER CATCH BASINS WITHIN THE WORK AREA TO PREVENT SEDIMENT MIGRATION. ALL
Demo & Erosion Control Plan 1. THE CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT THOSE ITEMS TO REMAIN, SUCH AS TREES, PROPERTY CORNER
PINS, UTILITY POLES, VALVES, HYDRANTS, CURBS, MANHOLES AND CATCH BASINS.
SILT FENCE BARRIERS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS SHOWN ON THE PLANS.
SCALE: 1"=50' 2. TEMPORARY SILT FENCE AND STRAW BALES TO BE INSTALLED AS DIRECTED BY THE OWNERS FIELD REPRESENTATIVE.
2. TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON SITE FOR RE-USE AS DIRECTED BY THE OWNER. ALL LOCAL ORDINANCES REGARDING THE SALE OF TOPSOIL MUST BE FOLLOWED. TOPSOIL MAY MAINTAIN UNTIL VEGATATION IS ESTABLISHED AND PAVEMENT IS INSTALLED.
NOT BE REMOVED WITHOUT A PERMIT.
3. FOR THOSE STRUCTURES TO BE DEMOLISHED, ALL EXISTING UTILITY SERVICES SHALL BE ABANDONED IN ACCORDANCE WITH
3. ALL SILT FENCE BARRIERS SHALL BE REPLACED WHEREVER THEY BECOME CLOGGED OR INOPERABLE. LOCAL REGULATIONS, ALL METERS SHALL BE RETURNED TO PROPER OWNERS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND REMOVAL OF TEMPORARY SEDIMENTATION CONTROLS. 4. THE CONTRACTOR SHALL INSTALL STABILIZED CONSTRUCTION ENTRANCES WHERE ACCESSING THE SITE FROM PAVED
ROADWAYS. DEMO & EROSION CONTROL LEGEND: DRAWING NAME:
5. THE CONTRACTOR MUST CONTROL DUST DURING CONSTRUCTION. DURING EARTHWORK OPERATIONS, WATER-SPREADING EQUIPMENT SHALL BE PROVIDED BY THE CONTRACTOR, AND SPREAD
WATER AS NECESSARY AND AS DIRECTED BY THE OWNER IN ORDER TO CONTROL DUST. 5. THE CONTRACTOR SHALL INSTALL TEMPORARY TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH NYS M.U.T.C.D.
STANDARDS PRIOR TO STARTING WORK. INSTALL STORM DRAINAGE INLET PROTECTION
Demo & Erosion
6. DIRT OR DEBRIS LEFT ON LOCAL PUBLIC ROADS AS A RESULT OF THIS CONSTRUCTION PROJECT SHALL BE REMOVED AND ROAD SURFACES CLEANED BY THE CONTRACTOR ON A DAILY BASIS.
6. STUMPS AND BRUSH MAY NOT BE BURIED IN THE TOWN AND TOPSOIL MAY NOT BE REMOVED FROM THE WORK SITE WITHOUT
Control Plan
7. ALL DISTURBED AREAS (EXCEPT AREAS TO BE PAVED OR BUILT UPON) SHALL BE TOPSOILED TO A MINIMUM 4" DEPTH AND SEEDED IMMEDIATELY AFTER FINE GRADING TAKES PLACE AND AS SOON A PERMIT
AS PHYSICALLY POSSIBLE. PROPOSED SILT FENCE/SILT SOCK
8. THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE OF DOWNSTREAM STORM SEWERS, DITCHES, AND CULVERTS. SILT BUILDUP FOUND TO BE A RESULT OF THIS SITE CONSTRUCTION
WORK SHALL BE REMOVED FROM DOWNSTREAM CULVERTS BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER OR THE TOWN/CITY.
Date: 5/22/26
AREA OF DISTURBANCE
9. ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN PLACE PRIOR TO BEGINNING EARTHWORK OPERATIONS AND SHALL BE MAINTAINED UNTIL THE NEW SLOPES ARE Drawn By: A. Pandolfe
STABILIZED WITH SEEDING AND/OR SLOPE PROTECTION, AS DIRECTED BY THE ENGINEER. Scale: As Noted
10. INSTALL TEMPORARY SILT FENCE AROUND THE BASE OF STOCKPILES.
DRAWING NO.
11. THE PROFESSIONAL CERTIFYING COMPLIANCE TO NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS MUST INSPECT AT A MINIMUM WEEKLY AND SHALL PROVIDE THESE INSPECTION
REPORT WITH A WRITTEN CERTIFICATION OF CONSTRUCTION COMPLIANCE TO THE
WEST
TOWN
SENECA
OF WEEKLY.
12. THE ENGINEER OF RECORD FOR THIS PROJECT CERTIFIES THAT THESE DESIGN PLANS MEET THE REQUIREMENTS AND ARE IN COMPLIANCE WITH THE NEW YORK STORMWATER MANAGEMENT
DESIGN MANUAL AND NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS. DUE TO SOIL DISTURBANCE BEING GREATER THAN ONE ACRE, A NYSDEC SPDES PERMIT MUST BE OBTAINED
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
50 0 50 100Ft.
C-001
50' Project No: 23-4121
BEFORE ANY ON-SITE DISTURBANCE IS MADE.
Page 1139 of 1493
Page 1140
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
SANDBAG
10 mil PLASTIC LINING
Utica
3'
2"X4" WOOD FRAME
DEWATERING CONCRETE BLOCK BERM
1.5' MAX. STAKE SECTION A-A
FLOW NOT TO SCALE
FLOW
Buffalo
FABRIC LATH AND
STRAW BALE FLAGGING ON
2:1 SLOPE GRAVEL FILTER 10' MIN.
BINDER WIRE 3 SIDES
3' MIN.
STONE & BLOCK PLAN VIEW STAPLES PLYWOOD
(2 PER BALE) 10 mil PLASTIC SANDBAG
LINING 48"X24" BLACK LETTERS
TEMPORARY WIRE SCREEN PAINTED WHITE 6" HEIGHT
SEDIMENT POOL DEWATERING A A
VARIES
SECTION B-B CONCRETE LAG SCREWS
DROP INLET BURIED FABRIC WOOD OR NOT TO SCALE
WASHOUT
WITH GATE 1'MIN. 16" METAL STAKES WOOD POST
FLOW
36"
FRAME 2'MAX. (2 PER BALE) 10' MIN. 3.5"X3.5"X8'
FLOW
BERM
36"
2" DROP INLET
EXCAVATED AREA (AS REQUIRED) WITH GATE
1' MIN. CONCRETE WASHOUT 10 mil PLASTIC LINING
SEDIMENT B B SIGN DETAIL PLAN
(OR EQUIVALENT)
VARIES
SIDE SLOPE 2:1 GATHER EXCESS AT TEMPORARY SEDIMENT POOL STONE & BLOCK DETAIL NOT TO SCALE
CORNERS 2" TYPE "BELOW GRADE"
Multifamily Development
1'MIN. 2:1 SLOPE 3:1 SLOPE WIRE MESH (OPTIONAL)
EXCAVATED DEPTH MIN. 1' TO A
CONSTRUCTION SPECIFICATIONS 2'MAX. 1' 10 mil PLASTIC LINING
8"
MAX. 2' BELOW TOP OF INLET. WEEP HOLES GRAVEL SUPPORTED BY HARDWARE 1.12" DIA
FOR CLOTH TO ALLOW DRAINAGE AND 1. FILTER FABRIC SHALL HAVE AN EOS OF 40-85. BURLAP MAY BE USED FOR SHORT TERM APPLICATIONS. FINE GRAVEL FACE STEEL WIRE
DEWATERING RESTRICT SEDIMENT MOVEMENT. (1'MIN. THICKNESS) STAPLE
3" STONE 10 mil PLASTIC LINING STRAW BALE DETAIL
2. CUT FABRIC FROM A CONTINUOUS ROLL TO ELIMINATE JOINTS. IF JOINTS ARE NEEDED THEY WILL BE OVERLAPPED TO PLAN (TYP) WOOD FRAME SECURELY
THE NEXT STAKE. "DOUGHNUT" DETAIL NOT TO SCALE FASTENED AROUND SECTION B-B
ENTIRE PERIMETER NOT TO SCALE
3. STAKE MATERIALS WILL BE STANDARD 2" x 4" WOOD OR EQUIVALENT. METAL WITH A MINIMUM LENGTH OF 3 FEET. TYPE "ABOVE GRADE" WITH STRAW BALES WITH TWO STAKES
CONSTRUCTION SPECIFICATIONS
CONSTRUCTION SPECIFICATIONS 4. SPACE STAKES EVENLY AROUND INLET 3 FEET APART AND DRIVE A MINIMUM 18 INCHES DEEP. SPANS GREATER THAN 3 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE FOR DEWATERING. FOUNDATION SHALL BE 2 INCHES MINIMUM BELOW REST NOTES
OF 10' MIN.
FEET MAY BE BRIDGED WITH THE USE OF WIRE MESH BEHIND THE FILTER FABRIC FOR SUPPORT. INLET AND BLOCKS SHALL BE PLACED AGAINST INLET FOR SUPPORT. TWO-STACKED
1. CLEAR THE AREA OF ALL DEBRIS THAT WILL HINDER EXCAVATION. 1. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD. 2X12 ROUGH
5. FABRIC SHALL BE EMBEDDED 1 FOOT MINIMUM BELOW GROUND AND BACKFILLED. IT SHALL BE SECURELY FASTENED TO2. B B WOOD FRAME
HARDWARE CLOTH OR 1/2" WIRE MESH SHALL BE PLACED OVER BLOCK OPENINGS TO SUPPORT STONE. 2. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30' OF THE
2. GRADE APPROACH TO THE INLET UNIFORMLY AROUND THE BASIN. THE STAKES AND FRAME.
TEMPORARY CONCRETE WASHOUT FACILITY.
1425 & 1475 Orchard Park Rd
VARIES
3. USE CLEAN STONE OR GRAVEL 1/2-3/4 INCH IN DIAMETER PLACED 2 INCHES BELOW TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER.
3. WEEP HOLES SHALL BE PROTECTED BY GRAVEL. 6. A 2" x 4" WOOD FRAME SHALL BE COMPLETED AROUND THE CREST OF THE FABRIC FOR OVER FLOW STABILITY. 3. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT STAKE (TYP)
4. FOR STONE STRUCTURES ONLY, A 1 FOOT THICK LAYER OF THE FILTER STONE WILL BE PLACED AGAINST THE 3 INCH STONE AS SHOWN ON THE FACILITIES SHALL BE REMOVED FROM THE SITE OF THE WORK AND
4. MAXIMUN DRAINAGE AREA 1 ACRE
UPON STABILIZATION OF CONTRIBUTING DRAINAGE AREA, SEAL WEEP HOLES, FILL BASIN WITH STABLE SOIL TO FINAL GRADE, DRAWINGS. DISPOSED OF OR RECYCLED.
COMPACT IT PROPERLY AND STABILIZE WITH PERMANENT SEEDING.
MAXIMUM DRAINAGE AREA 1 ACRE 4. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY
MAXIMUM DRAINAGE AREA 1 ACRE THE REMOVAL OF THE TEMPORARY CONCRETE WASHOUT FACILITIES TYPE "ABOVE GROUND"
SHALL BE BACKFILLED, REPAIRED, AND STABILIZED TO PREVENT 10 mil PLASTIC LINING
PLAN WITH WOOD PLANKS
© CARMINA WOOD DESIGN
EROSION.
NOT TO SCALE
West Seneca, NY
INLET PROTECTION DETAIL 1 INLET PROTECTION DETAIL 2 INLET PROTECTION DETAIL 3 CONCRETE WASHOUT DETAIL
NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE
NOTE: INSTALL ONE OF THE INLET PROTECTION OPTIONS SHOWN PRIOR TO CONSTRUCTION
50'MIN. EXISTING
PAVEMENT
Date
FILTER CLOTH (SECURELY ATTACHED 3' 5:
1
TO STAKES) 6"MIN.
10' MAX. C. TO C. MOUNTABLE BERM
EXISTING FILTER
GROUND CLOTH PROFILE (OPTIONAL)
36" MIN. LENGTH FENCE POSTS DRIVEN
MIN. 16" INTO GROUND
50'MIN.
HEIGHT OF FILTER = 16" MIN. REFER TO 10'MIN.
EXISTING NOTE #7
GROUND
EMBED FILTER CLOTH A EXISTING
OW 12'MIN.
No. Description
FL OW MIN. OF 6" IN GROUND. 12'MIN. / 24' MAX. PAVEMENT
FL
WOODEN STAKES ON 10' LINEAL
REVISIONS:
SPACING REFER TO
FILTER CLOTH DEPTH PERSPECTIVE VIEW 2"x2" WOODEN STAKE NOTE #7 10'MIN.
MARKINGS
SILT SOCK (8" MIN) PLAN VIEW
AREA TO BE
PROTECTED 3" TO 4" CONSTRUCTION SPECIFICATIONS
36" MIN. FENCE POST
POSTS SHALL BE A MINIMUM OF 20" WATER FLOW AREA TO BE PROTECTED
SILT SOCK WORK AREA 1. STONE SIZE - USE 2" STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.
FILTER CLOTH ATTACHED TO POST ABOVE THE EXISTING GRADE
FLOW 2. LENGTH - NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE LOT WHERE A 30 FOOT MINIMUM LENGTH WOULD
UNDISTURBED GROUND WORK AREA APPLY).
12"±
COMPACTED SOIL
3. THICKNESS - NOT LESS THAN SIX (6) INCHES.
EMBED FILTER CLOTH POSTS SHALL BE A MINIMUM OF 16"
A MIN. OF 6" IN GROUND BELOW THE EXISTING GRADE 4. WIDTH - TWELVE (12) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS
4" OCCURS. TWENTY-FOUR (24) FOOT IF SINGLE ENTRANCE TO SITE.
SECTION VIEW PLAN VIEW SECTION VIEW
5. FILTER CLOTH - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE.
NOTES: 6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED
CONSTRUCTION SPECIFICATIONS
ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED.
CONTRACTOR SHALL INSPECT AND MAINTAIN SILT SOCK AS NEEDED DURING THE DURATION OF CONSTRUCTION PROJECT.
1. WOVEN FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. POSTS SHALL BE STEEL EITHER "T" 7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING
OR "U" TYPE OR HARDWOOD. CONTRACTOR SHALL REMOVE SEDIMENT COLLECTED AT THE BASE OF THE SILT SOCK WHEN IT21HAS
OF THE
REACHED
EXPOSED OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACTED ONTO PUBLIC
HEIGHT OF THE SILT SOCK. ALTERNATIVELY, RATHER THAN CREATE A SOIL DISTURBING ACTIVITY, THE ENGINEER MAY CALL FOR RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY. TEMPORARY ASPHALT SHALL BE PLACED WITHIN RIGHT-OR-WAY TO
2. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER-LAPPED BY SIX INCHES AND FOLDED. ADDITIONAL SILT SOCK TO BE ADDED AT AREAS OF HIGH SEDIMENTATION, PLACED IMMEDIATELY ON TOP OF THE EXISTING ENSURE THIS.
FILTER CLOTH SHALL BE EITHER FILTER X, MIRAFI 100X, STABILINKA T140N, OR APPROVED EQUIVALENT. SEDIMENT LADEN SILT SOCK.
8. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON A AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN
3. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE. APPROVED SEDIMENT TRAPPING DEVICE.
9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN.
SILT SOCK DETAIL STABILIZED CONSTRUCTION ENTRANCE DETAIL DRAWING NAME:
NOT TO SCALE
SILT FENCE DETAIL NOT TO SCALE
Demo & Erosion
NOT TO SCALE
Control Details
Date: 5/22/26
Drawn By: A. Pandolfe
Scale: As Noted
DRAWING NO.
C-002
Project No: 23-4121
Page 1140 of 1493
Page 1141
UE
EX. PIN CB
UE
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
RIM:683.34
G
APPROX. LOCATION
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
W
N. INV:672.94 (18")
ST
Greensboro
S. INV:673.10 (18")
SA
CB
OE
" RIM:680.53
32
UE
8'- N. INV:671.23 (18")
EX 5' N .ST
CB
°-5
G
5.2 32' E OE
0 S. INV:671.23 (18")
.N .
10 RIM:685.39
0W.
AI
N. INV:677.49 (18")
L
87°-09'-45" S. INV:677.49 (16")
E. INV:676.99 (4")
UE
LIMIT OF TREE CLEARING
SA G
UE
OR
T MH
LO
W
Utica
ACK T. RIM:685.89
IDE SETB BI
25' S
UE
NW. INV:676.14 (12")
CH
SE. INV:676.22 (12")
UE
25'
PRO
SI D
1 .0
ES
PP .
G OE
P
AR
ETB
20'x8.5' MAIL KIOSK
SW
OSE W/AT
SA
'E
T
UE
AC
Buffalo
K
& BUS SHELTER
D 1 TAC
EX. REBAR
-ST HE
4.11' N.
D
N
UE
OR D G
O
TI
Y 5 AR
X. UE
CA
G E
PA
-UN AG
LO
O
W
113°-18'-53"
IT B ES
PROPOSED 1-STORY 4-UNIT BUILDING #3
O
UIL
SA S
PR
RK
UE
UE
DIN
AP
40'
1
G#
G
T
FRO
W/ATTACHED GARAGES
PROPOSED 1-STORY 4-UNIT BUILDING #4
IN
#2
NT
G E
EX. PIN
ILD
O
SET
U
W
RO
B
BA
IT S
CK
UE
PP 8' E.SA GSW
UN RAGE
0.
4
UE
Y- A
W/ATTACHED GARAGES
T OR ED G
A
S
1- CH
ED ATTA
EX 9' N
OE
UE
D
S
5.8 /L
PO /
.R .
T
±O
RO W
30' REAR SETBACK
EB
STOP P
(6
AR
UE
UE
6. 0
Multifamily Development
SA SOE
')
OE
UE
UE
PP
G
T
OE PP
OE 1.0' E.
OE
W
OE EX. IP.
14
11
OE
3.8
5°
PP 7.27' NW.
NW. COR. LOT 417
-0
BACK
6'
UE
LIMIT OF TREE CLEARING E SET
4'- SA W
PARKING
OE
25' SID
MS
47
STOP LOT
OE
.
S. LINE LOT 369
"
G
W
ST
12"
UE
EX. IP. EA
OE
. AR
N. INV: 660.98 (18" HDPE) BIT
25' SIDE SETBACK 12" 170°-37'-13"
OE
89°-57'-36"
APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF HYD
WG
OF CEMETERY CEMETERY AND NOTIFY DESIGN
SA S
UE
HEAD STONES NOT ENGINEER OF ANY POTENTIAL CONFLICTS
STORM WATER LOCATED
T OE
127°-49'-44"
1425 & 1475 Orchard Park Rd
MANAGEMENT AREA 14"
28"
14"
UE
EX. IP.
W. INV: 682.97
DECORATIVE ALUMINUM RAIL FENCE. (12" HDPE)
ST
STYLE TO BE COORDINATED W/ OWNER.
23"
UE
COM
12"
© CARMINA WOOD DESIGN
PARKING
S. INV: 662.31 (18" HDPE)
West Seneca, NY
LOT
UE
EX. IP.
729.52' .
O/L STOP PART OF &
MS
97.18' 146°-28'-21" D.
W. LINE LOT 417
1'
UE
L-11442, P-836 29
9.7
UE
PROPOSED 1-STORY 6 UNIT BUILDING #6
PROPOSED 1-STORY 6 UNIT BUILDING #5
38"
W/ATTACHED GARAGES
UE
EXCEPTION
COM
30"
W/ATTACHED GARAGES
149°-26'-50"
11" L-3327
6/15/26
10 24" EX. IP. P-87
30' REAR SETBACK
PARKING
Date
3. 2.04' NW.
UE
LOT 00
'D
.&
M
S.
SCRUB SHRUB WETLANDS (PSS) 36"
33
Per Planning Board comments
UE
(APPROXIMATE LOCATION) 153°-18'-56" 8.
"
14" 0'
10
D.
6'-
&
°-4
24" M
S.
89
8"
UE
S.
113°-43'-57"
'M
18"
00
No. Description
729.26'
3.
11
UE
COM
REVISIONS:
5"
T
ND
RA
.B
UE
1
NE
EX. REBAR
LI
S.
N.
M
EXCEPTION
.&
'D
8" 12" 11"
O/L
L-3036
70
2.
6" 8"
144.58'
12"
146.98'
150.63'
12"
26
153.06'
7" P-217
20" 6"
& 89'
S.
6" 12"
D. 72.
M
6" 13"
6"
0')
EX. IP.
133°-32'-58"
0.
25' SIDE SETBACK 12.33' W.
(7
COM
EX. IP.
3.20' S.
275.56' D. & MS.
AD
87°-23'-54"
RO
20"
N. INV: 669.78 (18" HDPE)
RG
SITE DATA ( REZONED TO C-1 (S) ) - 1425 & 1475 ORCHARD PARK RD - 16.59 ACRES GENERAL NOTES:
Overall Site Plan SITE LEGEND
BE
MULTI-FAMILY ALLOWED BY SPECIAL PERMIT 1. INSTALL ALL MATERIALS TO MANUFACTURER'S RECOMMENDATIONS AND BEST STANDARDS OF TRADE
INVOLVED. PROPERTY LINE
MIN. LOT WIDTH = 50 FT FOR FIRST DWELLING UNIT, PLUS 10 FT FOR EACH ADDITIONAL UNIT NEED NOT EXCEED 100 FT 2. SUBSTITUTIONS SHALL BE MADE ONLY WITH OWNER'S APPROVAL AND BE OF EQUIVALENT QUALITY TO
SCALE: 1"=50' WHAT IS SPECIFIED.
MIN. LOT AREA = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH ADDITIONAL DWELLING UNIT 3. WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH ALL LOCAL CODES AND OSHA SAFETY PROPOSED CONCRETE CURB
RULES AND REGULATIONS.
FRONT SETBACK = 40 FT 4. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT THE SITE. NOTIFY OWNER & ENGINEER OF
DISCREPANCIES IN CONDITIONS SHOWN ON DRAWINGS PRIOR TO PROCEEDING WITH THE WORK. DRAWING NAME:
1
SIDE SETBACK = 25 FT MIN. OR A DISTANCE EQUAL
2 HGT.
TO OF SUCH BUILDING, WHICHEVER IS GREATER PROPOSED SIDEWALK / CONCRETE PAD
5. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ANY EXISTING STRUCTURES TO REMAIN
REAR SETBACK = 30 FT or EQUAL TO THE HEIGHT OF THE BUILDING AND ANY FINISH MATERIAL INSTALLED WHILE WORKING ON OTHER COMPONENTS. Overall Site Plan
6. CONTRACTOR SHALL KEEP JOB FREE OF DEBRIS AND MAKE FINAL CLEANUP TO SATISFACTION OF NUMBER OF PARKING SPACES
MAXIMUM BUILDING HEIGHT = 40 FT (MULTI-FAMILY) OWNER. 27
7. CONTRACTOR SHALL ASCERTAIN THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION SO THAT
DRIVEWAY: 30 FT WIDE REQUIRED FOR MULTI-FAMILY THIS WORK WILL NOT DISTURB EXISTING LINES AND/OR INSTALLATIONS. COORDINATE ALL WORK WITHPROPOSED SIGN
THE APPLICABLE UTILITY COMPANIES.
DWELLING SIZE: 500 SF EACH MULTI-FAMILY UNIT 8. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS NECESSARY TO PERFORM THE
WORK. PROPOSED STANDARD DUTY
GROUP DWELLING: NO BUILDING SHALL BE NEARER TO ANY OTHER PRINCIPAL STRUCTURE THAN A DISTANCE EQUAL TO THE AVERAGE HEIGHT OF 9. ALL REASONABLE MEASURES SHALL BE TAKEN TO PROTECT EXISTING TREES WHICH ARE TO BE
SUCH BUILDINGS ASPHALT PAVEMENT Date: 5/22/26
PRESERVED FROM ALL POSSIBLE TYPES OF ROOT, TRUNK, AND LIMB DAMAGE; INCLUDING BUT NOT Drawn By: A. Pandolfe
LIMITED TO, RETAINING WALLS WHICH PREVENT FILLING ON TOP OF ROOTS OR EXCAVATING TREE
Scale: As Noted
PARKING CALCULATION: DENSITY CALCULATION (16.59 AC) ROOTS. PROPOSED LIGHT POLE
MULTI-FAMILY: DRAWING NO.
REQ'D = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH
REQ'D = 2 SPACES PER UNIT + 5/25 UNITS VISITORS ADDITIONAL DWELLING UNIT
C-100
NOTES:
REQ'D = 2 SPACES x 29 UNITS + (29/25 x645)SPACES
= NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
ALLOWED NUMBER OF UNITS: 1. ALL RADII SHALL BE 3'-0" UNLESS OTHERWISE NOTED. CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
TOTAL PROVIDED = 41 DRIVEWAY + 41 GARAGE + 27 OFF-STREET1ST UNIT: 722,660 SF - 8,000 SF = 714,660 SF REMAINING 2. ALL DISTURBED AREAS: SHALL HAVE 4" MIN. OF TOPSOIL & SEED.
= 109 SPACES ADDITIONAL UNITS: 714,660 SF / 5,000 SF = 142 UNITS 3. ALL DIMENSIONS FROM PROPERTY LINES SHALL BE MEASURED PERPENDICULAR TO THE PROPERTY LINE. 50 0 50 100Ft.
4. CENTER ENTRANCE SIDEWALKS ON DOOR OPENINGS. 50' Project No: 23-4121
TOTAL ALLOWED UNITS = 143 UNITS 5. BUILDING DIMENSIONS ARE APPROXIMATE, REFER TO ARCHITECTURAL DRAWINGS FOR LAYOUT DIMENSIONS.
Page 1141 of 1493
Page 1142
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
UE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
G
UE
EX. PIN CB
W
RIM:683.34
APPROX. LOCATION
G
N. INV:672.94 (18")
ST
UE
S. INV:673.10 (18")
OE
SA
Utica
CB
W
2" RIM:680.53
G
53.0
3
8'-
UE
N. INV:671.23 (18")
EX 5A' N .
CB
3'
-5
OE
0°
ST W
5.2 S 2' E OE
0' S. INV:671.23 (18")
.N .
33.
Buffalo
10 RIM:685.39
0.3G
AI
N. INV:677.49 (18")
L
UE
3
62.9
87°-09'-45" S. INV:677.49 (16")
UE
3'
9
E. INV:676.99 (4")
W
LIMIT OF TREE CLEARING 3 8
20.0
STG
OR
UE
'
UE
R33'
SA
T MH
LO
OE
BAC
K T. RIM:685.89
BI
R55'
T
W
E
DE S
5.0
I
25' S NW. INV:676.14 (12")
3
CH
G
R25'
'
UE
R33' SA
9 5
SE. INV:676.22 (12")
30.0
25'
SI
'
DE
1.0
W
PP .
OE
SET
30.
2
AR
G
4A
0'
'E
20.0
7
UE
0'
24.
BAC
TYP.
PRO
R5'
ST
K
'
PO W/A F.F.E
EX. REBAR 4B 3
Multifamily Development
3 1
SED TT . =
R25
4.11' N. '
1-S ACH 681
W
OE
2
D
0'
SA
TO ED .60
20'x8.5' MAIL KIOSK
40.
G
R5'
UE
0'
RY GA
21.
61.1
& BUS SHELTER TYP.
5-U RAG
3
R55'
4'
3
NIT ES
4A
PA
2
40.5
2
BU
W
113°-18'-53" 3
0' 2
OE
ILD
20.
6'
4A
UE
3
G
24.
IN
8
2
G#
0'
SA
38.0'
2
RK
24.0' 2
3
6
21.
40'
2
SWT
3
OE
0'
0'
2
PROPOSED 1-STORY 4-UNIT BUILDING #3
40.
FRO
UE
3
0' 2
G
2
30. 0'
33.
NT
20.
2
EX. PIN
SET
0'
0' #1
W/ATTACHED GARAGES
9.0
21.0' 21.
RO
ING
B
2
'
AC
SA GS
2
.0'
F.F.E. = 681.15
ILD
3
OE
K
PP 8' E.
19
1425 & 1475 Orchard Park Rd
W
1 BU
UE
24.0'
NIT AGES
0.
3
2 3 6
2
PROPOSED 1-STORY 4-UNIT BUILDING #4
U
' -4 R
T
5
5.0 RY D GA 80
24.
5
0'
24. T O .
0'
3 E
1-S ACH = 684
AD
20.0' 2
E D T
OS AT .E.
1
OE
W/ATTACHED GARAGES
W
2
EX 9' N
OP W/ F.F
UE
4 3
PR
SA
5.8 /L W G
3
20.0'
G
F.F.E. = 680.40
.R .
3 2
3
±OST E
3
30' REAR SETBACK
EB
2
6 3 STOP
© CARMINA WOOD DESIGN
6
2
(6
4A
AR
O
3
TY '
R5
P.
West Seneca, NY
1
UE
2 6
5.0'
4A 6
21.0'
24.0' .0'
6.0
9
SA
2
2
19.
4 3
R30'
1
9.0'
0'
UE
19.0'
ST
3 2
3 4 R1
2 5'
W
9
')
24.0'
OE
OE
PP
G
OE
5.0
2 3
OE
OE PP
'
OE 1.0' E.
SA
UE
'
OE
R20
3
32.19'
4A 1 OE
EX. IP.
30.0'
11
OE
R3 OE
WT
OE
S
OE
0'
5°
PP 7.27' NW.
R50'
0'
OE
-0
G
R2 3 ACK
SETB
4'- SA
38.0' DE PARKING
25' SI
47
STOP LOT
6/15/26
"
W
OE
OE
1
Date
9
G
ST
12" W
A
RE
OE
A
OE
W
LIMIT OF TREE CLEARING .
BIT
Per Planning Board comments
SA
3
12" 170°-37'-13"
OE
30.0' HYD
ST G E
APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF
O
W
OF CEMETERY CEMETERY AND NOTIFY DESIGN
ENGINEER OF ANY POTENTIAL CONFLICTS
STORM WATER MANAGEMENT AREA HEAD STONES NOT
SA
No. Description
LOCATED 127°-49'-44"
G
OE
4A
W
ST
REVISIONS:
14" 1
28"
14" GATE EX. IP.
1
R80 W. INV: 682.97
'
9 (12" HDPE)
Site Plan - North
SCALE: 1"=30'
SITE DATA ( REZONED TO C-1 (S) ) - 1425 & 1475 ORCHARD PARK RD - 16.59 ACRES
MULTI-FAMILY ALLOWED BY SPECIAL PERMIT
MIN. LOT WIDTH = 50 FT FOR FIRST DWELLING UNIT, PLUS 10 FT FOR EACH ADDITIONAL UNIT NEED NOT EXCEED 100 FT
GENERAL NOTES:
MIN. LOT AREA = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH ADDITIONAL DWELLING UNIT
DETAIL LEGEND SEE SITE DETAIL SHEET NOTE LEGEND 1. INSTALL ALL MATERIALS TO MANUFACTURER'S RECOMMENDATIONS AND BEST STANDARDS OF TRADE SITE LEGEND
FRONT SETBACK = 40 FT INVOLVED.
1
SIDE SETBACK = 25 FT MIN. OR A DISTANCE EQUAL
2 HGT.
TO OF SUCH BUILDING, WHICHEVER IS GREATER 2. SUBSTITUTIONS SHALL BE MADE ONLY WITH OWNER'S APPROVAL AND BE OF EQUIVALENT QUALITY TO
REAR SETBACK = 30 FT or EQUAL TO THE HEIGHT OF THE BUILDING 1 CONCRETE SIDEWALK 1 INSTALL STOP SIGN - M.U.T.C.D. SIGN NO. R1-1B PROPERTY LINE
WHAT IS SPECIFIED.
2 90° PARKING STALL INSTALL "NO PARKING" SIGN, M.U.T.C.D. SIGN NO. P1-1C 3. WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH ALL LOCAL CODES AND OSHA SAFETY
MAXIMUM BUILDING HEIGHT = 40 FT (MULTI-FAMILY) 2 RULES AND REGULATIONS. PROPOSED CONCRETE CURB
3 STOP BAR 4. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT THE SITE. NOTIFY OWNER & ENGINEER OF
DRIVEWAY: 30 FT WIDE REQUIRED FOR MULTI-FAMILY 3 LANDSCAPED AREA - SEE LANDSCAPE PLAN, IF NO PLANTINGS, INSTALL TOPSOIL & SEED DISCREPANCIES IN CONDITIONS SHOWN ON DRAWINGS PRIOR TO PROCEEDING WITH THE WORK.
4A STANDARD DUTY ASPHALT DRAWING NAME:
5. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ANY EXISTING STRUCTURES TO REMAIN PROPOSED SIDEWALK / CONCRETE PAD
DWELLING SIZE: 500 SF EACH MULTI-FAMILY UNIT 4B EXTERIOR CONCRETE SLAB ON GRADE 4 1' WIDE WHITE PAVEMENT STRIPES @ 1' SPACING BETWEEN 4" WIDE WHITE CROSSWALK LINES AND ANY FINISH MATERIAL INSTALLED WHILE WORKING ON OTHER COMPONENTS.
6. CONTRACTOR SHALL KEEP JOB FREE OF DEBRIS AND MAKE FINAL CLEANUP TO SATISFACTION OF Site Plan - North
GROUP DWELLING: NO BUILDING SHALL BE NEARER TO ANY OTHER PRINCIPAL STRUCTURE THAN A DISTANCE EQUAL TO THE AVERAGE HEIGHT OF 5 HANDICAPPED PAVEMENT MARKINGS 5 RELOCATE EX. UTILITY POLE - COORDINATE WITH UTILITY COMPANY OWNER. NUMBER OF PARKING SPACES
SUCH BUILDINGS 7. CONTRACTOR SHALL ASCERTAIN THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION SO THAT 27
6 HANDICAPPED PARKING SIGN
THIS WORK WILL NOT DISTURB EXISTING LINES AND/OR INSTALLATIONS. COORDINATE ALL WORK WITH
6 TACTILE WARNING MAT
PARKING CALCULATION: DENSITY CALCULATION (16.59 AC) 7 LIGHT POLE FOUNDATION THE APPLICABLE UTILITY COMPANIES. PROPOSED SIGN
MULTI-FAMILY: 7 HOTBOX 8. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS NECESSARY TO PERFORM THE
REQ'D = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH 8 DUMPSTER ENCLOSURE WORK.
REQ'D = 2 SPACES PER UNIT + 5/25 UNITS VISITORS ADDITIONAL DWELLING UNIT GROUND SIGN - SEE PLANS FROM OTHERS & COORDINATE LOCATION W/ OWNER 9. ALL REASONABLE MEASURES SHALL BE TAKEN TO PROTECT EXISTING TREES WHICH ARE TO BE PROPOSED STANDARD DUTY
9 WOODEN GUIDE RAIL 8 PRESERVED FROM ALL POSSIBLE TYPES OF ROOT, TRUNK, AND LIMB DAMAGE; INCLUDING BUT NOT
REQ'D = 2 SPACES x 29 UNITS + (29/25 x645)SPACES
= ASPHALT PAVEMENT Date: 5/22/26
ALLOWED NUMBER OF UNITS: LIMITED TO, RETAINING WALLS WHICH PREVENT FILLING ON TOP OF ROOTS OR EXCAVATING TREE Drawn By: A. Pandolfe
9 DECORATIVE ALUMINUM RAIL FENCE - COORDINATE STYLE W/ OWNER ROOTS.
TOTAL PROVIDED = 41 DRIVEWAY + 41 GARAGE + 27 OFF-STREET1ST UNIT: 722,660 SF - 8,000 SF = 714,660 SF REMAINING Scale: As Noted
= 109 SPACES ADDITIONAL UNITS: 714,660 SF / 5,000 SF = 142 UNITS PROPOSED LIGHT POLE
DRAWING NO.
TOTAL ALLOWED UNITS = 143 UNITS NOTES:
1.
2.
3.
4.
ALL RADII SHALL BE 3'-0" UNLESS OTHERWISE NOTED.
ALL DISTURBED AREAS: SHALL HAVE 4" MIN. OF TOPSOIL & SEED.
ALL DIMENSIONS FROM PROPERTY LINES SHALL BE MEASURED PERPENDICULAR TO THE PROPERTY LINE.
CENTER ENTRANCE SIDEWALKS ON DOOR OPENINGS.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-101
5. BUILDING DIMENSIONS ARE APPROXIMATE, REFER TO ARCHITECTURAL DRAWINGS FOR LAYOUT DIMENSIONS. Project No: 23-4121
30'
Page 1142 of 1493
Page 1143
STOP
OE
1
9
UE
12"
A
RE
OE
LIMIT OF TREE CLEARING . A
BIT
UE
3
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
25' SIDE SETBACK 12" 170°-37'-13"
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
OE
Greensboro
30.0'
APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF
OF CEMETERY CEMETERY AND NOTIFY DESIGN
UE
ENGINEER OF ANY POTENTIAL CONFLICTS
STORM WATER MANAGEMENT AREA HEAD STONES NOT
LOCATED 127°-49'-44"
UE
4A
14" 1
28"
14"
Utica
GATE
UE
R80 W. INV: 682.97
'
9 (12" HDPE)
Buffalo
UE
R5
0'
UE
30.0'
4A
9.0' 3 PARKING
'
R15
R15
LOT
UE
'
4
19.0
2
8
'
UE
1
2 3 STOP 2
PART OF
97.18' 146°-28'-21"
L-11442, P-836
UE
3 3
Multifamily Development
24.0' 24.0'
2 2
UE
2 2
UE
3 3
21.0' 21.0'
PROPOSED 1-STORY 6 UNIT BUILDING #6
2
UE
4A 2
PROPOSED 1-STORY 6 UNIT BUILDING #5
20.0' 20.0'
W/ATTACHED GARAGES
149°-26'-50"
W/ATTACHED GARAGES
UE
F.F.E. = 682.80
1425 & 1475 Orchard Park Rd
F.F.E. = 682.80
2 30.0' 2
PARKING
UE
3 3
LOT
20.0' 20.0'
UE
© CARMINA WOOD DESIGN
SCRUB SHRUB WETLANDS (PSS) 2 2
West Seneca, NY
(APPROXIMATE LOCATION) 153°-18'-56"
21.0' 21.0'
UE
2 2
3
8"
3
UE
2 4A
2
24.0' 24.0'
UE
4B
2 2
UE
6/15/26
3 3
Date
UE
8
Per Planning Board comments
UE
8" 12" 11"
No. Description
6" 8" 12"
7"
REVISIONS:
6"
6" 6" 12"
13"
1
6"
25' SIDE SETBACK
133°-32'-58"
GENERAL NOTES:
SITE DATA ( REZONED TO C-1 (S) ) - 1425 & 1475 ORCHARD PARK RD - 16.59 ACRES
MULTI-FAMILY ALLOWED BY SPECIAL PERMIT Site Plan - South 1.
2.
INSTALL ALL MATERIALS TO MANUFACTURER'S RECOMMENDATIONS AND BEST STANDARDS OF TRADE SITE LEGEND
INVOLVED.
SUBSTITUTIONS SHALL BE MADE ONLY WITH OWNER'S APPROVAL AND BE OF EQUIVALENT QUALITY TOPROPERTY LINE
MIN. LOT WIDTH = 50 FT FOR FIRST DWELLING UNIT, PLUS 10 FT FOR EACH ADDITIONAL UNIT NEED NOT EXCEED 100 FT SCALE: 1"=30' WHAT IS SPECIFIED.
3. WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH ALL LOCAL CODES AND OSHA SAFETY
MIN. LOT AREA = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH ADDITIONAL DWELLING UNIT RULES AND REGULATIONS. PROPOSED CONCRETE CURB
4. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT THE SITE. NOTIFY OWNER & ENGINEER OF
FRONT SETBACK = 40 FT DISCREPANCIES IN CONDITIONS SHOWN ON DRAWINGS PRIOR TO PROCEEDING WITH THE WORK. DRAWING NAME:
1
SIDE SETBACK = 25 FT MIN. OR A DISTANCE EQUAL
2 HGT.
TO OF SUCH BUILDING, WHICHEVER IS GREATER DETAIL LEGEND SEE SITE DETAIL SHEET NOTE LEGEND 5. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ANY EXISTING STRUCTURES TO REMAIN PROPOSED SIDEWALK / CONCRETE PAD
REAR SETBACK = 30 FT or EQUAL TO THE HEIGHT OF THE BUILDING AND ANY FINISH MATERIAL INSTALLED WHILE WORKING ON OTHER COMPONENTS.
1 CONCRETE SIDEWALK INSTALL STOP SIGN - M.U.T.C.D. SIGN NO. R1-1B 6. CONTRACTOR SHALL KEEP JOB FREE OF DEBRIS AND MAKE FINAL CLEANUP TO SATISFACTION OF Site Plan - South
MAXIMUM BUILDING HEIGHT = 40 FT (MULTI-FAMILY) 1
OWNER. NUMBER OF PARKING SPACES
2 90° PARKING STALL 7. CONTRACTOR SHALL ASCERTAIN THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION SO THAT 27
2 INSTALL "NO PARKING" SIGN, M.U.T.C.D. SIGN NO. P1-1C
DRIVEWAY: 30 FT WIDE REQUIRED FOR MULTI-FAMILY THIS WORK WILL NOT DISTURB EXISTING LINES AND/OR INSTALLATIONS. COORDINATE ALL WORK WITH
3 STOP BAR
THE APPLICABLE UTILITY COMPANIES.
LANDSCAPED AREA - SEE LANDSCAPE PLAN, IF NO PLANTINGS, INSTALL TOPSOIL & SEED PROPOSED SIGN
DWELLING SIZE: 500 SF EACH MULTI-FAMILY UNIT 4A STANDARD DUTY ASPHALT 3 8. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS NECESSARY TO PERFORM THE
1' WIDE WHITE PAVEMENT STRIPES @ 1' SPACING BETWEEN 4" WIDE WHITE CROSSWALK LINES WORK.
GROUP DWELLING: NO BUILDING SHALL BE NEARER TO ANY OTHER PRINCIPAL STRUCTURE THAN A DISTANCE EQUAL TO THE AVERAGE HEIGHT OF 4B EXTERIOR CONCRETE SLAB ON GRADE 4 9. ALL REASONABLE MEASURES SHALL BE TAKEN TO PROTECT EXISTING TREES WHICH ARE TO BE PROPOSED STANDARD DUTY
SUCH BUILDINGS PRESERVED FROM ALL POSSIBLE TYPES OF ROOT, TRUNK, AND LIMB DAMAGE; INCLUDING BUT NOT ASPHALT PAVEMENT Date: 5/22/26
5 HANDICAPPED PAVEMENT MARKINGS 5 RELOCATE EX. UTILITY POLE - COORDINATE WITH UTILITY COMPANY LIMITED TO, RETAINING WALLS WHICH PREVENT FILLING ON TOP OF ROOTS OR EXCAVATING TREE Drawn By: A. Pandolfe
6 HANDICAPPED PARKING SIGN ROOTS. Scale: As Noted
PARKING CALCULATION: DENSITY CALCULATION (16.59 AC) TACTILE WARNING MAT
6 PROPOSED LIGHT POLE
MULTI-FAMILY: 7 LIGHT POLE FOUNDATION DRAWING NO.
REQ'D = 8,000 SF FOR FIRST DWELLING UNIT, PLUS 5,000 FOR EACH
REQ'D = 2 SPACES PER UNIT + 5/25 UNITS VISITORS ADDITIONAL DWELLING UNIT 7 HOTBOX NOTES:
8 DUMPSTER ENCLOSURE
REQ'D = 2 SPACES x 29 UNITS + (29/25 x645)SPACES
=
ALLOWED NUMBER OF UNITS:
TOTAL PROVIDED = 41 DRIVEWAY + 41 GARAGE + 27 OFF-STREET1ST UNIT: 722,660 SF - 8,000 SF = 714,660 SF REMAINING
= 109 SPACES ADDITIONAL UNITS: 714,660 SF / 5,000 SF = 142 UNITS
9 WOODEN GUIDE RAIL 8
9
GROUND SIGN - SEE PLANS FROM OTHERS & COORDINATE LOCATION W/ OWNER
DECORATIVE ALUMINUM RAIL FENCE - COORDINATE STYLE W/ OWNER
1.
2.
3.
4.
ALL RADII SHALL BE 3'-0" UNLESS OTHERWISE NOTED.
ALL DISTURBED AREAS: SHALL HAVE 4" MIN. OF TOPSOIL & SEED.
ALL DIMENSIONS FROM PROPERTY LINES SHALL BE MEASURED PERPENDICULAR TO THE PROPERTY LINE.
CENTER ENTRANCE SIDEWALKS ON DOOR OPENINGS.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-102
Project No: 23-4121
TOTAL ALLOWED UNITS = 143 UNITS 5. BUILDING DIMENSIONS ARE APPROXIMATE, REFER TO ARCHITECTURAL DRAWINGS FOR LAYOUT DIMENSIONS.
30'
Page 1143 of 1493
Page 1144
12" X 18" RED ON WHITE (M.U.T.C.D. SIGN NO. R7-1),
PAVEMENT WIDTH VARIES SEE SITE PLAN 7' ABOVE GRADE, MOUNT ON 2"Ø PIPE
TRAFFIC YELLOW 4" WIDE
NEW CONCRETE (MIN. 3,500 PSI) PAINTED LINE (TYP) EDGE OF PVMT. 1.5" ASPHALT TOP COURSE, TYPE 7 NO FACING PARKING AISLE (MAY BE BUILDING
SIDEWALK - 4" MIN. THK. (N.Y.S.D.O.T. ITEM 403.18) PARKING MOUNTED, SEE SITE PLAN) FOR INSTALLATION IN
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
DRIVEWAY - 6" MIN THK. W/W.W.F.6X6/10X10 ANY PAVEMENT, SEE HANDICAPPED PARKING SIGN DETAIL.
EXPANSION JOINT 2.5" ASPHALT BINDER COURSE, TYPE 3
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
TIME
Greensboro
1/2" RECESS GRASS AREA (N.Y.S.D.O.T. ITEM 403.13)
SEE PLAN
SLOPE 8" SUBBASE COURSE MATERIAL, TYPE 1 NO PARKING SIGN (SEE DETAIL), LOCATE
EXISTING SIDEWALK CURB LANDSCAPED AREA AS SHOWN ON SITE PLAN
1/4" / FT. (N.Y.S.D.O.T. ITEM 304.02)
HANDICAPPED PARKING
PAVEMENT 9'-0" 9'-0" 9'-0" 9'-0" SIGN (SEE DETAIL)
19'
EDGE OF PAVEMENT
EDGE OF PVMT.
19'
NONWOVEN GEOTEXTILE FABRIC
MIRAFI 600X OR APPROVED EQUAL (IF
FORM SUBBASE WARRANTED BY SITE CONDITIONS
STONE SUBBASE MATERIAL TYPE 2 (N.Y.S.D.O.T. ITEM DURING CONSTRUCTION)
Utica
CROSS SECTION TRAFFIC YELLOW 4" WIDE
19'-0' (TYP)
304.12)
MIN. 4" THICK (SIDEWALK) GRADED AND COMPACTED PAVEMENT SUBGRADE PAINTED LINE (TYP)
SEE PLAN 9'-0" 9'-0" MIN. 9'-0"
MIN. 6" THICK (DRIVEWAY) NOTE: CONSTRUCTION METHODS FOR ASPHALT PAVEMENT SHALL
NOTES: CONFORM TO NYSDOT STANDARD SPECIFICATION 401-3, WITH INTERNATIONAL
1. CONTROL JOINTS TO BE AT 5'-0" O.C., BOTH WAYS WHERE APPLICABLE. SEE SPECIFICATIONS FOR FURTHER JOINT HANDICAP SYMBOL - 5A
Buffalo
SUBBASE CONSTRUCTION METHODS CONFORMING TO NYSDOT
REQUIREMENTS NYSDOT 702-0700. 90° PARKING STALL LAYOUT - 2 STANDARD SPECIFICATION 304-3.
24" (TYP)
2. CONCRETE SIDEWALK AND DRIVEWAY MATERIAL SHALL CONFORM TO NYSDOT STANDARD SPECIFICATION 501 AND 2'-0" (TYP) 45° (TYP)
CONSTRUCTION METHODS SHALL CONFORM TO NYSDOT STANDARD SPECIFICATION 608-3. STANDARD DUTY ASPHALT SECTION - 4A
3. SUBBASE GRADE SHALL FOLLOW THE PROPOSED GRADE OF THE SIDEWALK AND SLOPE AWAY FROM BUILDING WHERE
APPLICABLE, PROVIDE CONTINUOUS STONE PATH TO CURB UNDERDRAIN WHERE PROVIDED. HANDICAPPED PAVEMENT MARKINGS & SIGNAGE - 5
4. FULL DEPTH EXPANSION JOINTS SHALL BE INSTALLED EVERY 20' O.C., BOTHWAYS WHERE APPLICABLE. SEE
SPECIFICATIONS FOR FURTHER JOINT REQUIREMENTS NYSDOT 702-0700.
SEE
TRAFFIC REFLECTIVE PLAN
5. SEE CURB DETAIL FOR DOWLING REQUIREMENTS WHERE ABUTTING CURB.
WHITE PAINT 2'-0" PAVEMENT WIDTH VARIES SEE SITE PLAN WHITE REFLECTIVE
STOP SIGN - M.U.T.C.D. SIGN NO. R1-1 PAINT
6. INSTALL 6" LONG #3 DOWELS @ 12" O.C. WHERE SIDEWALK ABUTS A BUILDING WALL AT AN ENTRANCE, THICKEN SIDEWALK
TO 6" AT BUILDING WALL AND INSTALL DOWEL CENTERED IN THE 6" DEPTH. DOWELS AND THICKENING OF SIDEWALK 6" CONCRETE SLAB (MIN. 4,000 PSI)
SHALL EXTEND 18" EITHER SIDE OF ENTRANCE. 4'-0" CONTROL JOINTS @ 10' O.C. BOTH WAYS. SEAL ALL JOINTS
1'-6" 2'-0" WITH ASPHALT CEMENT, NYSDOT SPECIFICATIONS 702-0700
CENTER LINE TWO LANE PAVEMENT
SAFETY BLUE
Multifamily Development
7. INSTALL 1/2" PREMOLDED EXPANSION JOINT WITH BACKER ROD & SEALANT WHERE SIDEWALK ABUTS BUILDING OR OTHER STOP BAR BACKGROUND
STRUCTURE.
STOP 6"x6" 10/10 WELDED WIRE FABRIC (3" BELOW TOP OF SLAB)
8'-0"
X X X X X X X
42"
FACE OF CURB OR
5" SUBBASE COURSE
CONCRETE SIDEWALK - 1 EDGE OF PAVEMENT,
SEE PLAN MATERIAL, TYPE 1
(NYSDOT ITEM 304.02)
51/2" 1'-8"
GRADED AND COMPACTED PAVEMENT SUBGRADE
(TYP)
8'-5"
CENTERED IN LANE NOTE: CONCRETE PAVEMENT MATERIAL SHALL CONFORM TO NYSDOT
SEE PLAN STANDARD SPECIFICATION 501 AND CONSTRUCTION METHODS
SHALL CONFORM TO NYSDOT STANDARD SPECIFICATION 502-3. 42"
STOP BAR DETAIL - 3 EXTERIOR CONCRETE SYMBOL TO BE CENTERED IN PARKING SPACE
SLAB-ON-GRADE SECTION - 4B
1425 & 1475 Orchard Park Rd
INTERNATIONAL HANDICAP
12'-0"
CENTER TO CENTER SYMBOL - 5A
6'-0" 4" DIAMETER GALVANIZED STEEL GATE POST (TYP.
3" DIAMETER GALVANIZED STEEL TYP. EACH SIDE)
POST (TYP.)
© CARMINA WOOD DESIGN
1' x 1' CHAMFER (TYP. EACH SIDE)
24'-0"
West Seneca, NY
FENCE GATE POST 4"Ø STANDARD WEIGHT, HANDICAPPED PARKING SIGN
CENTER TO CENTER M.U.T.C.D. SIGN NO. P4-6C
SCH. 40, HOT DIPPED GALVANIZED W/ MIN.
TYP.
6'-0"
1.8 OZ/SF OF ZINC (TYP.)
11'-0" RESERVED
EDGE OF CONCRETE OPENING - FACE TO FACE PARKING
DOUBLE GATE
LATCH 4"
FENCE GATE POST (TYP.)
CENTER TO CENTER
24'-0"
DUMPSTER ON CONC. PAD,
DOUBLE GATE - CHAIN LINK FENCE
SEE SITE PLAN W/VINYL SCREENING STRIPS AND DROP
ROD
2" SQR. GALVANIZED PUNCH TUBE
6'-0"
7'-0"
Date
SLEEVE FOR 3/4" DROP ROD,
AT GRADE WITH CONCRETE, 1 1/2" RECESS
PROVIDE 1 FOR EACH SIDE OF GATE
(TYP. BOTH SIDES)
GRADE
DOUBLE GATE - CHAIN LINK FENCE W/VINYL
SCREENING STRIPS AND DROP ROD (120° SWING 6"
6"
MIN.) DROP ROD 9" 9" TOP OF CONCRETE
(TYP. OF 2)
3'-6" MIN.
GATE FRAME CHAIN LINK FENCE GATE NOTES:
6' HIGH BOARD ALL WELDED JOINTS TO 3,500 PSI CONCRETE
6" Ø PIPE BOLLARD SET IN CONCRETE 3' BELOW GRADE, EXTEND
FENCE, SEE DETAIL MAKE SOLID FRAME 1. GATE POST FOOTINGS TO BE MIN. 36" DEEP x (4x) POST DIAMETER, EXTEND POST TO WITHIN 6" OF BOTTOM. 1'-6" DIA. CONCRETE BASE
No. Description
4' ABOVE GRADE, FILL W/CONCRETE, PAINT OSHA YELLOW (TYP.
OF 6)
3' WIDE CHAIN LINK FENCE GATE & FRAME WITH VINYL SCREENING STRIPS, 2. GATE FRAMES TO BE 2" SQ. GALVANIZED STEEL, WEIGHING 2.60 LB/FT IN ACCORDANCE WITH ASTM F 900.
REVISIONS:
5' WIDE SIDEWALK TO GATE TO HAVE LATCHING MECHANISM TO KEEP CLOSED WHEN NOT BEING FRONT VIEW
PLAN VIEW ACCESS GATE, EXTEND TO 3. CHAIN LINK FENCE FABRIC SHALL BE 2" MESH, 9 GAUGE, ZINC COATED STEEL CORE WIRE. INSTALL MESH WITH HOOK BOLTS
ACCESSED 2" 1'-6"
ASPHALT DRIVE AND TENSION BARS ON ALL 4 SIDES, ATTACH AT 15" MAX.
4. DOUBLE GATE LATCH TO BE FORKED TYPE CAPABLE OF RETAINING GATE IN CLOSED POSITION AND HAVE PROVISION FOR PAD NOTES:
DUMPSTER ENCLOSURE - 8 LOCK. LATCH SHALL BE OPERABLE FROM EITHER SIDE OF GATE.
1. HANDICAPPED PARKING SIGN SHALL CONFORM WITH
CURRENT STATE AND LOCAL CODES AND REGULATIONS.
5. ALL HARDWARE TO BE HOT DIPPED GALVANIZED STEEL TO SUIT GATE SIZE.
HANDICAP PARKING SIGNS - 6
INSTALLED IN GRASS/LANDSCAPED AREA
A FIXTURE FURNISHED,
INSTALLED AND WIRED BY ELECTRICAL
CONTRACTOR.
1" X 6" BOARD 1"
TYP.
2" X 6" TOP RAILS
ELECTRICAL CONTRACTOR FURNISHED POLE 8"
3-20# NAILS ATTACHED 4"x6" GASKET HAND HOLE 13" x 5/8 " GALVANIZED CARRIAGE BOLT,
TO RAIL POST (EACH SIDE) ELECT. CONTRACTOR TO WASHER & NUT COUNTERSUNK (TYP.)
CONNECT OR CADWELD FURNISHED AND INSTALL IN-LINE PRESSURE TREATED PINE
GROUND WIRE TO BALLAST FUSES IN BUSSMANN LENGTHS: INTERMEDIATE
5'-6" (6' HIGH FENCE)
3" Ø GALVANIZED STEEL POST,
8"
"TRON" WEATHERPROOF FUSE SPANS - 8'-0", END
8'-0" O.C. 12' LONG (8' HIGH FENCE) 1"x45° CHAMFER SPANS - 8'-3"
8'-0" O.C. 10' LONG (6' HIGH FENCE) HOLDERS #HEB-AD WITH #KTK
ROUND FORMED CONCRETE FUSES (SIZE AS REQUIRED)
BASE 30" DIAMETER
6'-0"
4 - 40"x1"Ø ANCHOR BOLTS 8'-0" O.C. (TYP.)
2" X 6" CENTER RAILS
#3 REINFORCING TIES
12" ON CENTER 4"
SEE NOTE
1" 3"
1"
5"
2" X 6" BOTTOM RAILS FINISHED GRADE
10"
#6 BARE GROUND WIRE
12" DIA. HOLE, FILL WITH 3,000 PSI CADWELD CONNECTION DRAWING NAME:
3'-0" MIN.
(BOTH ENDS)
6'-6" MIN.
2'-6"
CONC.
8'-0" MIN. AND DOWN
3/4 "x10" COPPER WELD 3" x 10" ROUGH SAWN Site Details
6"
GRADE
TO SOLID BEARING
GROUND ROD (LIGHTING FACE ALL SIDES GRADE
PROTECTION)
CARLON PLASTIC CONDUIT
2'-0" GRAVEL FILL GALVANIZED STEEL TO CARLON
4'-0" MIN.
3" COVER
CONDUIT CONNECTOR
END POST
4'-0"
NOTES:
GALVANIZED CONDUIT "ELL"
6"
1. ALL WOODEN FENCE MATERIAL TO BE PRESSURE TREATED PINE.
2. CENTER, BOTTOM AND TOP RAILS TO BE FASTENED TO 3" Ø GALVANIZED 4 - #8 VERTICAL INTERMEDIATE POST
STEEL FENCE POSTS USING SIMPSON PIPE GRIP TIES OR EQUAL. ALL REINF. BARS
ALL CONCRETE WORK AND Date: 5/22/26
6"
HARDWARE TO BE GALVANIZED. REINFORCING SHALL BE 24" DIA.
3. ATTACH EACH 1" X 6" BOARD TO RAILS USING (3) GALVANIZED NAILS AT BY SITE CONTRACTOR CONCRETE 3,000 PSI CONCRETE Drawn By: A. Pandolfe
EACH RAIL LOCATION. BASE 1-6" DIA. 8" x 8" ACTUAL POSTS ROUGH FOUNDATION (TYP.) Scale: As Noted
4. WOOD POSTS CAN BE SUBSTITUTED FOR STEEL. NOTES: SAWN FACE ALL SIDES, 1"
1. FOR LOCATIONS OF FOUNDATIONS SEE SITE PLAN CHAMFER TOP AND SIDES, DRAWING NO.
2. FOR LIGHT FIXTURE ORDERING INFORMATION SEE SITE LIGHTING PLAN PRESSURE TREATED PINE
SECTION A-A
C-103
3. LIGHT POLE BASE EXPOSURE ABOVE GRADE SHALL BE:
A IN CURBED ISLANDS: 6" ABOVE TOP OF CURB ELEVATION
IN PAVEMENT: 3' ABOVE GRADE DECORATIVE WOODEN GUIDE RAIL - 9
IN NON-CURBED GRASS AREAS: 6" ABOVE GRADE
BOARD ON BOARD FENCE - FOR DUMPSTER ENCLOSURE
LIGHT POLE FOUNDATION - 7 Project No: 23-4121
Page 1144 of 1493
Page 1145
UE
EX. PIN CB
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
UE
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
RIM:683.34
G
APPROX. LOCATION
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
W
Greensboro
682 N. INV:672.94 (18")
ST
S. INV:673.10 (18")
SA
CB
OE
2" RIM:680.53
UE
8 '-3 N. INV:671.23 (18")
EX 5' N .ST
CB
°-5 683
G
5.2 32' E OE
0 S. INV:671.23 (18")
.N .
RIM:685.39
75 10
0W.
6 680
AI
678 N. INV:677.49 (18")
L
676 677 87°-09'-45"
679 S. INV:677.49 (16")
680 81
684 E. INV:676.99 (4")
UE
6
SA G
UE
OR
T MH
Utica
LO
W
T. RIM:685.89
BI 685
UE
NW. INV:676.14 (12")
CH
681
SE. INV:676.22 (12")
UE
680
1 .0
683 686
PP . 684
G OE
AR
SW
SA
'E
PRO
Buffalo
T
UE
PO W/A F.F.E
EX. REBAR
680
SED TT . =
2 684
4.11' N. 671 67
1-S ACH 681
4
673 67
687
D
N
UE
TO ED .60
6
675 67
O
RY GA
8
682
677 67
TI
5-U RAG
UE
679
CA
680
NIT ES
G E
PA
675
LO
O
BU
683
W
113°-18'-53"
ILD
9
67
X.
ING
RO
SA S
#2
RK
P
UE
UE
AP
671
680
T
PROPOSED 1-STORY 4-UNIT BUILDING #3
680
GE
EX. PIN
O
1
W/ATTACHED GARAGES
G#
W
RO
IN
F.F.E. = 681.15
ILD
UE
685
681
PP 8' E.SA GSW
T BU S
672
0.
I E
UN G
PROPOSED 1-STORY 4-UNIT BUILDING #4
UE
684
-4 RA
686
RY GA
687
TO HED 84.80
691
-S
A
1 C 6
684 ED TA =
OS AT .E.
W/ATTACHED GARAGES
EX 9 ' N
OP W/ F.F
OE
UE
D
PR
5.8 /L
F.F.E. = 680.40
.R .
T
683
±O
685
EB
STOP
679
2
(6
AR
UE
67
681
UE
6.0
688
Multifamily Development
9
68
682 684
SA SOE
')
OE 694
UE
UE
PP
G
T
3 OE PP
67 OE
OE 1.0' E.
W
OE EX. IP.
14
11
680
681 OE 687 688 689
3.8
0
5°
PP 7.27' NW.
68
NW. COR. LOT 417
-0
6'
UE
684 685
4'- SA W
PARKING
1
OE
MS
670
686
69
47
STOP LOT
OE
.
S. LINE LOT 369 679
"
4
G
692
9
678
3
69
677
68
69
0
W
ST
663 682
688
69
12"
UE
670
5
EX. IP. 7 671
EA
5
66
6
672
69
OE
R
66
66 673 .A
N. INV: 660.98 (18" HDPE)
674
675 BIT
675 12" 170°-37'-13"
OE
89°-57'-36" 674
668
673 HYD
2
672 APPROX. LOCATION
68
CONTRACTOR TO VERIFY LIMITS OF
671
680
669
WG
670 OF CEMETERY CEMETERY AND NOTIFY DESIGN
SA S
UE
ENGINEER OF ANY POTENTIAL CONFLICTS
HEAD STONES NOT
LOCATED
T OE
673.50
1425 & 1475 Orchard Park Rd
127°-49'-44"
673.50
14"
28"
14"
674
UE
EX. IP.
W. INV: 682.97
4
66
(12" HDPE)
ST
675 682
674 677
678
23"
UE
COM
676
© CARMINA WOOD DESIGN
12"
9 PARKING
West Seneca, NY
67 680 1
687
S. INV: 662.31 (18" HDPE) 68 LOT
75
UE
685 684
6
686
670
686
683
EX. IP.
5 6 STOP MS
.
683
O/L
66 67 68
2 682
PART OF &
1
D.
4
146°-28'-21"
68
W. LINE LOT 417
1'
68
UE
68
L-11442, P-836 9.7
5
1
68
29
7
67 0
679
68
UE
680
682
681
38"
PROPOSED 1-STORY 6 UNIT BUILDING #6
682
682
UE
EXCEPTION
COM
30"
PROPOSED 1-STORY 6 UNIT BUILDING #5
8
690
W/ATTACHED GARAGES
149°-26'-50"
67
11" L-3327
W/ATTACHED GARAGES
6/15/26
F.F.E. = 682.80
F.F.E. = 682.80
10 24" EX. IP. P-87
Date
682
PARKING
666
3. 2.04' NW.
UE
LOT 00
'D
.&
M
S.
682
SCRUB SHRUB WETLANDS (PSS) 36"
33
UE
(APPROXIMATE LOCATION) 153°-18'-56" 5 8.
"
0'
69
14"
10
Per Engineering comments
D.
6'-
6
&
9
°-4
7
24"
66
M
67
66
S.
89
8"
UE
675
668
S.
113°-43'-57"
'M
18"
No. Description
00
0
0
3.
682
70
68
11
UE
669
COM
REVISIONS:
5" 682
T
ND
RA
681
.B
UE
1
683
NE
684
670
EX. REBAR
685
LI
682
S.
686
687
N.
M
688
EXCEPTION
.&
'D
8" 12" 11"
O/L
L-3036
70
2.
12" 6" 8"
671
12"
26
7" P-217
20" 6"
& 89'
4
3
S.
68
70
6" 12"
D. 72.
M
6" 13"
2 6"
67
0')
EX. IP.
5
68
133°-32'-58"
COM 670
0.
12.33' W.
673 5
69
(7
EX. IP.
3.20' S.
275.56' D. & MS.
AD
674 700 710
87°-23'-54" 705
RO
675 6
20" 68
7
8
68 9
68 695
68
N. INV: 669.78 (18" HDPE)
RG
676
683
1
68
PROPOSED GRADING LEGEND
BE
PROPOSED CONTOUR 101
Overall Grading Plan PROPOSED SPOT ELEVATION 100.80
SCALE: 1"=50' TW 100.50 DRAWING NAME:
PROPOSED TOP/BOTTOM OF WALL ELEV.
BW 100.00 Overall Grading Plan
PROPOSED CATCH BASIN CB
PAVEMENT/GROUND SLOPE
PROPOSED YARD DRAIN YD
Date: 5/22/26
Drawn By: A. Pandolfe
PROPOSED MANHOLE MH Scale: As Noted
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
50 0 50 100Ft.
C-200
50' Project No: 23-4121
Page 1145 of 1493
Page 1146
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
UE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
G
UE
EX. PIN CB
W
RIM:683.34
APPROX. LOCATION
G
682 N. INV:672.94 (18")
ST
UE
S. INV:673.10 (18")
Utica
OE
SA
CB
W
2" RIM:680.53
G
-' 3
UE
8 N. INV:671.23 (18")
EX 5A' N .
-5 CB
683
OE
°
ST W
5.2 S32' E OE
Buffalo
0 S. INV:671.23 (18")
.N .
5 10 RIM:685.39
0. G
67 680
AI
678 N. INV:677.49 (18")
L
677
UE
676 679 0
YD 4 87°-09'-45" 683.55 S. INV:677.49 (16")
UE
68 RIM 680.20 683.0±
681 MATCH EX. 684 E. INV:676.99 (4")
W
STG
OR
UE
679.95
UE
SA
679.20 681.10 OT 683.7± MH
OE
L
IT. MATCH EX. RIM:685.89
PATIO
685
W
CB 6 B %
681.60 683.60 2.3 NW. INV:676.14 (12")
CH
G
RIM 679.00
681
UE
679.75 .5% 684.00
681.10 1 SE. INV:676.22 (12")
1.2% 683.45
80
684.5±
SA
% MATCH EX.
679.70 1.3% 6679.20 3.9
1.0
W
683 686
PP . 684
OE
679.95
AR
680.90
G
'E
.3% 684.50
UE
CB 1
PRO
3 684.25
ST
RIM 683.25
Multifamily Development
PO W/A F.F.E
EX. REBAR
680
SED TT . =
2 1.2% 684
4.11' N. 671 67 684.10
1-S ACH 681
W
4
OE
673 67
687
D
681.10
TO ED .60
SA
6 683.45
G
675 67
UE
%
RY GA
8
3.0
682
677 67 683.45
5-U RAG
679 680.65 679.90 F.F.E. = 683.70
680
NIT ES
PATIO %
PA
1.3
675
681.60
BU
YD 5
683
W
113°-18'-53"
OE
ILD
%
9
% 683.90
3.1 1.3
67
1.2
2.5
RIM 680.20
UE
G
IN
679.00 CB 7 4.7%
%
%
G#
680.65 PATIO
1.9
SA
RIM 678.80
2
681.15 680.55 684.00
%
RK
680.20
1.3
%
684.20
671 % 684.30
SWT
OE
1.3 CB 2
1.4
680
679.90
PROPOSED 1-STORY 4-UNIT BUILDING #3
UE
680 680.25
%
G
CB 5 PATIO RIM 683.25
RIM 679.80 681.60 EX. PIN 683.85 684.30
1.9
2.1% 680.65 % 681.10 1
W/ATTACHED GARAGES
2.8 G#
%
RO
4.2%
DIN
SA GS
F.F.E. = 681.15
1425 & 1475 Orchard Park Rd
679.90
1.2%
PATIO 680.35 % 684.30 BUIL
685
OE
681
PP 8' E.
1.2
W
681.10
UE
680.40 679.30 IT S
67 2
0.
1.5% 680.65 %
1.3 UN RAGE
PROPOSED 1-STORY 4-UNIT BUILDING #4
684
% 683.65 4
1.5
686
2.3
-
T
Y A
OR ED G 4.80 PATIO
687
1.2% 680.25
%
% T
691
1.3 683.35 S
1- CH 68
A
4.3% 684.80
2.5
YD 7 ED ATTA E. =
684 S
OE
W/ATTACHED GARAGES
%
PO / F.
W
EX 9' N
RIM 680.00 683.20
UE
1.2
% RO W F.
D
680.80
SA
684.30 P
5.8 /L W G
680.60 684.10
1.3
G
F.F.E. = 680.40
2.3%
.R .
683
±OST E
%
685
YD 6 PATIO 684.10
683.00
EB
STOP
© CARMINA WOOD DESIGN
680.70 RIM 680.20 684.80
679
YD 1
2 679.90
(6
West Seneca, NY
AR
67
O
PATIO
681
684.30 RIM 683.70
UE
CB 8 4.7% 680.65 681.15 680.45 680.95
2.9% RIM 678.80 682.65 684.20 YD 2
6
1.2
682.35 RIM 683.70 9
688
SA
68
%
683.40
1.2%
.0'
680.35 680.85 682.00 682 684
1.2%
680.65 CB 3
UE
ST
RIM 682.15
681.20
W
PATIO 2.2%
1.5
OE
OE
694
)
680.40 683.50 PP
%
G
OE
3 679.90 PP
1.3
684.10 OE
1.5% OE
67
1.2%
1.0' E.
%
681.50 OE
SA
UE
1.2% 680.55 OE
679.55 CB 4 OE
OE
EX. IP.
11
680
1.2% 1.2% 682.75 OE
RIM 679.90 689
WST
BIORETENTION AREA #1 681 OE 687 688
OE
0
5°
PP 7.27' NW.
68
2,855 S.F. 679.90 679.35 681.90 682.85
OE
680.35 681.50
-0
G
679.55 680.10 682.35
(2,850 S.F. REQUIRED) 684 685
4'- SA
680.55 682.10 PARKING
1
TOP ELEV = 673.50 STM MH 1 686
69
47
STOP LOT
6/15/26
BOTTOM ELEV = 673.00 RIM 679.20 YD 3
679
"
W
4
YD 12-15 (TYP.)
OE
692
OE
9
678 RIM 684.00
Date
3
69
RIM 673.50 677
68
69
0
G
ST
682
688
69
12" W
5
A
RE
OE
69
A
OE
673
W
.
674
BIT
SA
675
Per Engineering comments
END SECTION 12" 170°-37'-13"
OE
INV 673.00 HYD
2
ST G E
APPROX. LOCATION
68
CONTRACTOR TO VERIFY LIMITS OF
680
O
W
OF CEMETERY CEMETERY AND NOTIFY DESIGN 682.70
ENGINEER OF ANY POTENTIAL CONFLICTS CB 12
INSTALL BERM BETWEEN HEAD STONES NOT
1.2%
682.90 RIM 682.90
No. Description
SA
BIORETENTION AREAS,
673.50 ELEV. 674.00 LOCATED 127°-49'-44"
G
OE
REVISIONS:
1.5%
W
673.50
ST
14" 682.90
YD 16-18 (TYP.) 28"
RIM 673.50 683.10
14"
674
1
END SECTION EX. IP.
INV 673.00 W. INV: 682.97
678.20 678.95 (12" HDPE)
675 682
674 677 679.70 681.30
678
END SECTION
INV 669.57
STM MH 2
676
CB 11 1.5% 1.2% CB 10 1.5% 681.10 RIM 683.00
POND 675.30 RIM 678.00 RIM 679.50
678.75
9 PARKING
67 680 1
687
BIORETENTION AREA #2 678.20 678.40 678.95 679.88 68 681.30
LOT
679.15
PROVIDE RIP-RAP STABILIZATION 75 1,700 S.F.
684
6
686
Grading Plan - North
PROPOSED GRADING LEGEND
SCALE: 1"=30'
PROPOSED CONTOUR 101
PROPOSED SPOT ELEVATION 100.80
TW 100.50 DRAWING NAME:
PROPOSED TOP/BOTTOM OF WALL ELEV.
BW 100.00 Grading Plan - North
PROPOSED CATCH BASIN CB
PAVEMENT/GROUND SLOPE
PROPOSED YARD DRAIN YD
Date: 5/22/26
Drawn By: A. Pandolfe
PROPOSED MANHOLE MH Scale: As Noted
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-201
Project No: 23-4121
30'
Page 1146 of 1493
Page 1147
6 679.55 CB 4 OE
OE
680
1.2% 1.2% RIM 679.90 682.75 OE
BIORETENTION AREA #1 681 688
UE
OE 687
0
PP
68
2,855 S.F. 679.90 679.35 681.90 682.85
OE
679.55 680.35 681.50 682.35
(2,850 S.F. REQUIRED) 680.10 684 685
TOP ELEV = 673.50 STM MH 1 680.55 682.10
670
PROVIDE RIP-RAP STABILIZATION 686
UE
ALONG BANK OF DETENTION POND
YD 12-15 (TYP.)
BOTTOM ELEV = 673.00
679
RIM 679.20
STOP YD 3
OE
9
ADJACENT TO BIORETENTION AREA 678 RIM 684.00
RIM 673.50 677
68
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
UE
682
688
670 12"
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
7 671
EA
Greensboro
6
6
OE
672
6 673 AR
66
T.
674
BI
UE
675
674
675 END SECTION 12" 170°-37'-13"
OE
INV 673.00
668
673
2
672 APPROX. LOCATION
68
CONTRACTOR TO VERIFY LIMITS OF
671
680
669
670 OF CEMETERY CEMETERY AND NOTIFY DESIGN 682.70
UE
END SECTION ENGINEER OF ANY POTENTIAL CONFLICTS CB 12
INSTALL BERM BETWEEN HEAD STONES NOT
1.2%
INV 668.80 END SECTION 682.90 RIM 682.90
BIORETENTION AREAS,
Utica
INV 669.00 END SECTION 673.50 ELEV. 674.00 LOCATED 127°-49'-44"
INV 669.57
UE
1.5%
673.50 682.90
YD 16-18 (TYP.)
14"
28"
RIM 673.50 683.10
14"
674
Buffalo
END SECTION
UE
INV 673.00 W. INV: 682.97
678.20 678.95 (12" HDPE)
682
UE
OUTLET 674 675 677
678 679.70 681.30
STRUCTURE END SECTION
RIM 674.80 INV 669.57
STM MH 2
UE
676
10' WIDE EMERGENCY CB 11 681.10
TOP OF 1.5% 1.2% CB 10 1.5% RIM 683.00
SPILLWAY ELEV. 674.80 RIM 678.00
POND 675.30 RIM 679.50
LINE WITH LIGHT STONE FILL 678.75
9 PARKING
67 680 1
687
RIP RAP FLUSH WITH SPILLWAY 678.20 678.40 678.95 679.88 68 681.30
BIORETENTION AREA #2 679.15 LOT
75 1,700 S.F.
UE
PROVIDE RIP-RAP STABILIZATION
685 684
6
686
ALONG BANK OF DETENTION POND (1,620 S.F. REQUIRED)
670
686
683
ADJACENT TO BIORETENTION AREA TOP ELEV = 673.50
BOTTOM ELEV = 673.00 681.50
UE
76 STOP
683
2
Multifamily Development
682
6 END SECTION
8 PART OF
1
6
4
INV 675.00 146°-28'-21"
68
68
682.30
L-11442, P-836
2.5%
68 682.30
5
UE
1
68
7 3.6% 3.6%
67 682.30 680.90
80
682.30
679
PATIO PATIO
UE
682.80
6 2.9% 2.9% 682.80
682.10
680
UE
2.6% 2.6%
682
681
PROPOSED 1-STORY 6 UNIT BUILDING #6
682.30 682.30
682
UE
682
1425 & 1475 Orchard Park Rd
PROPOSED 1-STORY 6 UNIT BUILDING #5
1.7%
8
1.7%
690
W/ATTACHED GARAGES
YD 8 149°-26'-50"
67
W/ATTACHED GARAGES
RIM 681.90
UE
F.F.E. = 682.80
1.2%
F.F.E. = 682.80
PATIO 682.10 682.10 PATIO 682.10
682
682.80 682.80 PARKING
UE
1.3%
681.90 LOT
© CARMINA WOOD DESIGN
West Seneca, NY
1.8% 1.8%
682
UE
SCRUB SHRUB WETLANDS (PSS) 682.30 682.30 YD 9
(APPROXIMATE LOCATION)
2.7%
RIM 681.90 153°-18'-56" 9 5
2.7%
6
UE
9
67
8"
CB 9
UE
PATIO RIM 681.00
3.3% 3.3% PATIO
682.80 682.30 682.30 682.80
675
UE
682.10
6/15/26
682.30 YD 11 682.30
0
Date
0
682
RIM 681.70
0
68
7
UE
682
682.10 682.10 YD 10
1.2%
Per Engineering comments
RIM 681.90
UE
681 683
684
685
UE
682
686
687
No. Description
681.60 688
12"
REVISIONS:
8" 11"
6" 8" 12"
7"
1
6"
6" 84 12"
6" 6 13"
6"
8 5 133°-32'-58"
6
5
69
700 705 710
86
6 PROPOSED GRADING LEGEND
7
8
8 9
68 695
68
6 PROPOSED CONTOUR 101
PROPOSED SPOT ELEVATION 100.80
Grading Plan - South PROPOSED TOP/BOTTOM OF WALL ELEV.
TW 100.50
BW 100.00
DRAWING NAME:
SCALE: 1"=30' Grading Plan - South
PROPOSED CATCH BASIN CB
PAVEMENT/GROUND SLOPE
PROPOSED YARD DRAIN YD
Date: 5/22/26
Drawn By: A. Pandolfe
PROPOSED MANHOLE MH Scale: As Noted
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-202
Project No: 23-4121
30'
Page 1147 of 1493
Page 1148
EX. PIN CB
UE
RIM:683.34
G
APPROX. LOCATION
W
N. INV:672.94 (18")
ST
S. INV:673.10 (18")
SA
CB
OE
2" RIM:680.53
UE
8 '-3 N. INV:671.23 (18")
EX 5' N .ST
CB
°-5
G
5.2 32' E OE
0 S. INV:671.23 (18")
.N .
10 RIM:685.39
0W.
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
AI
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
N. INV:677.49 (18")
L
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
87°-09'-45" S. INV:677.49 (16")
Greensboro
E. INV:676.99 (4")
UE
SA G
UE
OR
T MH
LO
W
B IT. RIM:685.89
NW. INV:676.14 (12")
UE
C
SE. INV:676.22 (12")
UE
HA
1.0
PP .
G OE
SW
SA
'E
PRO
T
UE
PO W/A F.F.E
EX. REBAR
R
SED TT . =
4.11' N.
1-S ACH 681
Utica
D
N
UE
TO ED .60
O
RY GA
TI
5-U RAG
X. UE
CA
NIT ES
G E
PA
LO
O
BU
W
113°-18'-53"
ILD
ING
O
#2
SA S
PR
RK
UE
UE
Buffalo
AP
T
PROPOSED 1-STORY 4-UNIT BUILDING #3
G E
EX. PIN
O
1
W/ATTACHED GARAGES
G#
W
RO
IN
F.F.E. = 681.15
ILD
UE
PP 8' E.SA GSW
T BU S
0.
I
UN GE
PROPOSED 1-STORY 4-UNIT BUILDING #4
UE
-4 RA
RY GA
- STO HED 84.80
AD
1 C 6
ED TA =
OS AT .E.
W/ATTACHED GARAGES
EX 9' N
OP W/ F.F
OE
UE
PR
5.8 /L
F.F.E. = 680.40
.R .
T
±O
EB
STOP
(6
AR
UE
UE
6.0
SA SOE
')
OE
UE
UE
PP
G
T
OE PP
OE 1.0' E.
OE
W
OE EX. IP.
14
11
OE
3 .8
5
PP 7.27' NW.
°-0
NW. COR. LOT 417
6'
UE
4'- SA W
PARKING
OE
MS
Multifamily Development
47
STOP LOT
OE
.
S. LINE LOT 369
"
G
W
ST
12"
UE
EX. IP. A
RE
OE
.A
N. INV: 660.98 (18" HDPE) BIT
675 12" 170°-37'-13"
OE
89°-57'-36" 674
673
672 APPROX. LOCATION HYD
671 CONTRACTOR TO VERIFY LIMITS OF
WG
670 OF CEMETERY CEMETERY AND NOTIFY DESIGN
SA S
UE
ENGINEER OF ANY POTENTIAL CONFLICTS
HEAD STONES NOT
LOCATED
T OE
673.50
127°-49'-44"
673.50
14"
28"
14"
UE
EX. IP.
W. INV: 682.97
(12" HDPE)
ST
23" UE
1425 & 1475 Orchard Park Rd
COM
12"
PARKING
S. INV: 662.31 (18" HDPE) LOT
UE
EX. IP.
.
O/L STOP PART OF &
MS
146°-28'-21" D.
W. LINE LOT 417
1'
UE
L-11442, P-836 9.7
© CARMINA WOOD DESIGN
29
West Seneca, NY
UE
38"
PROPOSED 1-STORY 6 UNIT BUILDING #6
UE
EXCEPTION
COM
30"
PROPOSED 1-STORY 6 UNIT BUILDING #5
W/ATTACHED GARAGES
149°-26'-50"
11" L-3327
W/ATTACHED GARAGES
F.F.E. = 682.80
F.F.E. = 682.80
10 24" EX. IP. P-87
PARKING 3. 2.04' NW.
UE
LOT 00
'D
.&
M
S.
SCRUB SHRUB WETLANDS (PSS) 36"
33
UE
(APPROXIMATE LOCATION) 153°-18'-56" 8.
"
14" 0'
10
6/18/26
D
6'-
.&
°-4
24" M
Date
S.
89
8"
UE
S.
113°-43'-57"
'M
18"
00
3.
Per Engineering comments
11
UE
COM
5"
T
ND
RA
.B
UE
NE
EX. REBAR
No. Description
LI
S.
N.
M
EXCEPTION
.&
'D
12"
REVISIONS:
8" 11"
O/L
L-3036
70
2.
12" 6" 8" 12"
26
7" P-217
20" 6"
& 89'
S.
1
6" 12"
D. 72.
M
6" 13"
6"
')
.0
EX. IP.
133°-32'-58" 12.33' W.
0
(7
COM
EX. IP.
3.20' S.
275.56' D. & MS.
AD
87°-23'-54"
RO
20"
N. INV: 669.78 (18" HDPE)
RG
PROPOSED UTILITY LEGEND
BE
STORMWATER RUNOFF SUMMARY PROPOSED STORM SEWER ST
Overall Drainage Plan TO DETENTION:
EVENT PROP. RUNOFF (CFS) ELEVATION (FEET) STORAGE (CF)
PROPOSED SANITARY SEWER 6" SA
SCALE: 1"=50' 1-YEAR 1.83 670.86 4,596
PROPOSED WATERLINE 1" W
10-YEAR 2.80 672.91 14,741
25-YEAR 3.08 673.66 20,871
100-YEAR 3.43 674.69 34,430
PROPOSED CATCH BASIN CB
DIRECT:
EVENT PROP. RUNOFF (CFS) PROPOSED YARD DRAIN YD DRAWING NAME:
1-YEAR 0.38
10-YEAR 1.12
25-YEAR 1.57 PROPOSED MANHOLE MH Overall Drainage
100-YEAR 2.52
PROPOSED HYDRANT ASSEMBLY
Plan
TOTAL SITE:
EVENT EX. RUNOFF (CFS) PROP. RUNOFF (CFS)
1-YEAR 2.63 1.87 PROPOSED GATE VALVE GV
10-YEAR 8.17 2.89
25-YEAR 11.66 3.23 NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A Date: 5/22/26
100-YEAR 18.97 4.61 3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE
Drawn By: A. Pandolfe
COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE
BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK. Scale: As Noted
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
50 0 50 100Ft.
C-300
50' Project No: 23-4121
Page 1148 of 1493
Page 1149
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
UE
G
UE
EX. PIN CB
W
RIM:683.34
Utica
APPROX. LOCATION
G
N. INV:672.94 (18")
ST
UE
S. INV:673.10 (18")
OE
SA
CB
W
Buffalo
2" RIM:680.53
G
3
8'-
UE
N. INV:671.23 (18")
EX 5A' N .
CB
°-5
OE
ST W
5.2 S 2' E OE
0 S. INV:671.23 (18")
.N .
0 RIM:685.39
0.3G
1
AI
C.O. N. INV:677.49 (18")
L
UE
CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER 87°-09'-45" S. INV:677.49 (16")
UE
DRAIN @ 1.0%. COORDINATE DOWNSPOUT YD 4 E. INV:676.99 (4")
W
LOCATIONS WITH ARCHITECTURAL PLANS.
STG
RIM 680.20
OR
INV 678.70
UE
UE
SA
OT MH
OE
L
IT. RIM:685.89
W
CB 6 C.O. B
NW. INV:676.14 (12")
CH
G
RIM 679.00
UE
INV 676.80 SE. INV:676.22 (12")
SA
Multifamily Development
1 .0
130 LF 6"
W
PP .
OE
AR
HDPE @ 0.5%
G
CB 1
'E
CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER
UE
PRO
RIM 683.25
ST
DRAIN @ 1.0%. COORDINATE DOWNSPOUT
PO W/A F.F.E
EX. REBAR LOCATIONS WITH ARCHITECTURAL PLANS. INV 681.00
SED TT . =
126 LF 8"
4.11' N.
1-S ACH 681
W
HDPE @ 0.5%
OE
D
TO ED .60
SA
C.O. C.O.
G
UE
R Y GA
100 LF 8"
5-U RAG
HDPE @ 0.7% C.O.
NIT ES
PA
BU
W
113°-18'-53"
OE
ILD
CB 7
UE
G
IN
G#
RIM 678.80
SA
2
INV 676.30
RK
C.O. C.O. YD 5 CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER
SWT
OE
RIM 680.20 DRAIN @ 1.0%. COORDINATE DOWNSPOUT
PROPOSED 1-STORY 4-UNIT BUILDING #3
UE
1425 & 1475 Orchard Park Rd
INV 678.05
G
32 LF 6" HDPE ROOF CB 2 LOCATIONS WITH ARCHITECTURAL PLANS.
51 LF 12" EX. PIN RIM 683.25
LEADER @ 1.0% C.O. #1
W/ATTACHED GARAGES
HDPE @ 0.5% INV 680.30 NE, SE
RO
G
82 LF 12" DIN
SA GS
F.F.E. = 681.15
CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER INV 677.97 SW I L
OE
PP 8' E.
W
HDPE @ 0.3% CB 5 BU
UE
DRAIN @ 1.0%. COORDINATE DOWNSPOUT C.O.
52 LF 6" NIT AGES
0.
YD 7 RIM 679.80
PROPOSED 1-STORY 4-UNIT BUILDING #4
LOCATIONS WITH ARCHITECTURAL PLANS. HDPE @ 0.5% U
-4 R
T
RIM 680.00 INV 676.17 32 LF 6" HDPE ROOF O RY D GA 80
T E . YD 1
1-S ACH = 684
AD
INV 675.92 LEADER @ 1.0%
E D TT . RIM 683.70
© CARMINA WOOD DESIGN
S
OE
W/ATTACHED GARAGES
YD 6 PO W/A F.F.E
W
EX 9' N
INV 681.98
UE
O
RIM 680.20 PR
SA
West Seneca, NY
5.8 /L W G
G
F.F.E. = 680.40
C.O. C.O.
.R .
INV 677.28 12"x6" TEE
±OST E
CB 8
EB
RIM 678.80
STOP INV 677.79
(6
INV 676.05
AR
O
UE
30 LF 6" HDPE ROOF 17 LF 6" HDPE ROOF 66 LF 6"
LEADER @ 1.0% 132 LF 12" LEADER @ 1.0% HDPE @ 0.5%
6.0
HDPE @ 0.7%
SA
46 LF 6"
HDPE @ 0.5% 149 LF 8" YD 2
UE
ST
71 LF 12" HDPE @ 0.8% RIM 683.70
HDPE @ 0.5%
W
C.O. C.O. INV 681.65
')
CB 3
OE
OE
32 LF 6" HDPE ROOF RIM 682.15 PP
G
63 LF 12" 70 LF 8" OE
LEADER @ 1.0% INV 679.90 E C.O. OE
OE PP
HDPE @ 0.5% HDPE @O0.8%
E 1.0' E.
SA
UE
148 LF 12" INV 677.05 NE, NW, W OE
32 LF 6" HDPE ROOF OE
OE EX. IP.
11
HDPE @ 1.0% OE YD 3
LEADER @ 1.0%
WST
BIORETENTION AREA #1 OE
OE
RIM 684.00
5°
PP 7.27' NW.
6/18/26
2,855 S.F. CB 4
OE
INV 681.09
-0
G
(2,850 S.F. REQUIRED) RIM 679.90
Date
4'- SA
C.O. C.O. PARKING
TOP ELEV = 673.50 INV 675.57
47
YD 12-15 (TYP.)
RIM 673.50
BOTTOM ELEV = 673.00 STOP LOT
"
W
30 LF 6" PERF. 131 LF 15"
OE
OE
INV 669.67 HDPE @ 0.0% 121 LF 18" STM MH 1 HDPE @ 1.0%
G
HDPE @ 1.0% RIM 679.20
ST
INV 675.74 N 12"
Per Engineering comments
31 LF 6" W
A
48 LF 6" HDPE ROOF INV 674.21 SW, E
RE
OE
HDPE @ 0.3% EX. PIPE TO DISCHARGE
.A
OE
W
LEADER @ 1.0% DIRECTLY TO CB 12
BIT
SA
12" 170°-37'-13"
OE
HYD
ST G E
APPROX. LOCATION CB 12
No. Description
18"x6" TEE CONTRACTOR TO VERIFY LIMITS OF
O
W
INV 673.83 OF CEMETERY CEMETERY AND NOTIFY DESIGN RIM 682.90
INV 679.28
REVISIONS:
END SECTION ENGINEER OF ANY POTENTIAL CONFLICTS
INV 673.00
HEAD STONES NOT
SA
673.50 LOCATED 127°-49'-44"
G
OE
W
YD 16-18 (TYP.)
1
673.50
ST
RIM 673.50 14"
INV 669.67 28"
14"
END SECTION EX. IP.
INV 673.00 W. INV: 682.97
355 LF 12" HDPE @ 1.0%
EX. STORM SEWER TO BE (12" HDPE)
12" E-W INV 675.41
48 LF 12" 12" NW-SE INV 673.40 RE-ROUTED.
END SECTION
INV 669.57 HDPE @ 1.1% 73 LF 12" HDPE @ 1.0%
EX. STORM SEWER TO BE
31 LF 6" RE-ROUTED.
HDPE @ 0.3%
TOP OF CB 10 STM MH 2
POND 675.30 BIORETENTION AREA #2 END SECTION PARKING
1,700 S.F. CB 11 12"x6" TEE 123 LF 12" RIM 679.50 RIM 683.00
INV 675.00 RIM 678.00 INV 675.98 HDPE @ 1.1% INV 676.83 INV 678.55
(1,620 S.F. REQUIRED)
INV 675.48 E
LOT
TOP ELEV = 673.50
BOTTOM ELEV = 673.00 INV 673.53 NW
STORMWATER RUNOFF SUMMARY
Drainage Plan - North TO DETENTION:
PROPOSED UTILITY LEGEND
PROPOSED STORM SEWER ST
SCALE: 1"=30' EVENT PROP. RUNOFF (CFS) ELEVATION (FEET) STORAGE (CF)
1-YEAR 1.83 670.86 4,596
10-YEAR 2.80 672.91 14,741 PROPOSED SANITARY SEWER 6" SA DRAWING NAME:
25-YEAR 3.08 673.66 20,871
100-YEAR 3.43 674.69 34,430 Drainage
PROPOSED WATERLINE 1" W
DIRECT: Plan - North
EVENT PROP. RUNOFF (CFS) PROPOSED CATCH BASIN CB
1-YEAR 0.38
10-YEAR 1.12
25-YEAR 1.57 PROPOSED YARD DRAIN YD
100-YEAR 2.52 Date: 5/22/26
Drawn By: A. Pandolfe
TOTAL SITE: PROPOSED MANHOLE MH Scale: As Noted
EVENT EX. RUNOFF (CFS) PROP. RUNOFF (CFS) DRAWING NO.
1-YEAR 2.63 1.87 PROPOSED HYDRANT ASSEMBLY
10-YEAR 8.17 2.89
25-YEAR
100-YEAR
11.66
18.97
3.23
4.61 PROPOSED GATE VALVE
NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A
3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE
GV NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-301
Project No: 23-4121
COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE 30'
BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK.
Page 1149 of 1493
Page 1150
32 LF 6" HDPE ROOF OE YD 3
LEADER @ 1.0% HDPE @ 1.0% OE
BIORETENTION AREA #1
UE
OE RIM 684.00
2,855 S.F. CB 4 PP
OE
INV 681.09
(2,850 S.F. REQUIRED) C.O. RIM 679.90
TOP ELEV = 673.50 C.O. INV 675.57
UE
YD 12-15 (TYP.)
RIM 673.50 30 LF 6" PERF.
BOTTOM ELEV = 673.00
131 LF 15" STOP
OE
INV 669.67 HDPE @ 0.0% 121 LF 18" STM MH 1 HDPE @ 1.0%
HDPE @ 1.0% RIM 679.20
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
UE
INV 675.74 N 12"
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
31 LF 6" A
Greensboro
48 LF 6" HDPE ROOF INV 674.21 SW, E
RE
OE
HDPE @ 0.3% EX. PIPE TO DISCHARGE
LEADER @ 1.0% DIRECTLY TO CB 12 . A
BIT
UE
17 LF 8"
HDPE @ 0.5%
674
675 12" 170°-37'-13"
OE
673
25 LF 8" 672 18"x6" TEE APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF CB 12
671 RIM 682.90
HDPE @ 0.5% 670 INV 673.83 OF CEMETERY CEMETERY AND NOTIFY DESIGN
UE
END SECTION ENGINEER OF ANY POTENTIAL CONFLICTS INV 679.28
END SECTION END SECTION HEAD STONES NOT
INV 668.80 INV 673.00
INV 669.00
Utica
673.50 LOCATED 127°-49'-44"
END SECTION
UE
673.50 YD 16-18 (TYP.)
INV 669.57 RIM 673.50 14"
INV 669.67 28"
14"
Buffalo
UE
END SECTION
OUTLET INV 673.00 W. INV: 682.97
STRUCTURE 355 LF 12" HDPE @ 1.0%
RIM 674.80 EX. STORM SEWER TO BE (12" HDPE)
12" E-W INV 675.41
INV 668.93 RE-ROUTED.
UE
END SECTION 48 LF 12" 12" NW-SE INV 673.40
INV 669.57 HDPE @ 1.1% 73 LF 12" HDPE @ 1.0%
EX. STORM SEWER TO BE
31 LF 6" RE-ROUTED.
UE
10' WIDE EMERGENCY HDPE @ 0.3%
SPILLWAY ELEV. 674.80 TOP OF CB 10 STM MH 2
LINE WITH LIGHT STONE FILL POND 675.30 BIORETENTION AREA #2 END SECTION PARKING
1,700 S.F. CB 11 12"x6" TEE 123 LF 12" RIM 679.50 RIM 683.00
RIP RAP FLUSH WITH SPILLWAY INV 675.00 RIM 678.00 INV 675.98 HDPE @ 1.1% INV 676.83 INV 678.55
(1,620 S.F. REQUIRED) LOT
UE
TOP ELEV = 673.50 INV 675.48 E
BOTTOM ELEV = 673.00 INV 673.53 NW
UE
20 LF 6" PERF. 40 LF 6" HDPE ROOF STOP
Multifamily Development
HDPE @ 0.0% LEADER @ 1.0% C.O. C.O. C.O. C.O.
146°-28'-21"
PART OF
L-11442, P-836
UE
CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER
UE
DRAIN @ 1.0%. COORDINATE DOWNSPOUT
LOCATIONS WITH ARCHITECTURAL PLANS.
UE
PROPOSED 1-STORY 6 UNIT BUILDING #6
YD 8
UE
209 LF 12"
1425 & 1475 Orchard Park Rd
HDPE @ 0.8% RIM 681.90
PROPOSED 1-STORY 6 UNIT BUILDING #5
INV 679.80
W/ATTACHED GARAGES
149°-26'-50"
W/ATTACHED GARAGES
UE
F.F.E. = 682.80
F.F.E. = 682.80
63 LF 8"
CONNECT DOWNSPOUTS TO 6" HDPE PERIMETER HDPE @ 0.5% PARKING
DRAIN @ 1.0%. COORDINATE DOWNSPOUT
UE
LOT
© CARMINA WOOD DESIGN
LOCATIONS WITH ARCHITECTURAL PLANS.
West Seneca, NY
UE
YD 9
SCRUB SHRUB WETLANDS (PSS) RIM 681.90
(APPROXIMATE LOCATION) INV 679.48 153°-18'-56"
UE
32 LF 6" HDPE ROOF
CB 9 LEADER @ 1.0% 8"
RIM 681.00
UE
73 LF 8"
INV 678.50 HDPE @ 0.5%
UE
6/18/26
7 LF 6" HDPE ROOF
36 LF 8"
Date
LEADER @ 1.0%
C.O. C.O. HDPE @ 0.5% C.O.
UE
C.O.
32 LF 6" HDPE ROOF YD 11
LEADER @ 1.0% RIM 681.70 YD 10
85 LF 8" RIM 681.90
Per Engineering comments
INV 678.68
UE
HDPE @ 0.5% INV 679.11
UE
No. Description
12"
REVISIONS:
8" 11"
6" 8" 12"
7"
1
6"
6" 6" 12"
13"
6"
133°-32'-58"
STORMWATER RUNOFF SUMMARY PROPOSED UTILITY LEGEND
Drainage Plan - South TO DETENTION:
EVENT PROP. RUNOFF (CFS) ELEVATION (FEET) STORAGE (CF)
PROPOSED STORM SEWER ST
1-YEAR 1.83 670.86 4,596 PROPOSED SANITARY SEWER 6" SA DRAWING NAME:
SCALE: 1"=30' 10-YEAR 2.80 672.91 14,741
25-YEAR 3.08 673.66 20,871
PROPOSED WATERLINE 1" W
Drainage
100-YEAR 3.43 674.69 34,430
DIRECT:
Plan - South
PROPOSED CATCH BASIN CB
EVENT PROP. RUNOFF (CFS)
1-YEAR 0.38
10-YEAR 1.12 PROPOSED YARD DRAIN YD
25-YEAR 1.57 Date: 5/22/26
100-YEAR 2.52
Drawn By: A. Pandolfe
PROPOSED MANHOLE MH
TOTAL SITE: Scale: As Noted
DRAWING NO.
EVENT EX. RUNOFF (CFS) PROP. RUNOFF (CFS) PROPOSED HYDRANT ASSEMBLY
1-YEAR 2.63 1.87
10-YEAR
25-YEAR
100-YEAR
8.17
11.66
18.97
2.89
3.23
4.61
PROPOSED GATE VALVE GV
NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A
3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-302
Project No: 23-4121
COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE 30'
BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK.
Page 1150 of 1493
Page 1151
6'
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
2'
DETECTABLE TAPE, 1'-6"
TRENCH WIDTH BELOW FINISHED GRADE
WIDTH OF PIPE
(I.D. + 24")
2
Utica
2'
12" (I.D.) 12"
Buffalo
12"
1
. PLAN VIEW
O.D.
IA
.)
D
D
(I.
(6"MIN.)
1/3 I.D.
(12"MAX.)
NOTES:
A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS.
Multifamily Development
B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING.
6'-0"
C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL
PLACEMENT AND MAXIMUM PAY LIMITS.
D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL
BE USED IN ALL UNSHEETED TRENCH AREAS.
TYPICAL PRECAST CATCH BASIN
MATERIALS ELEVATION
PIPE BEDDING MATERIAL (NYSDOT 1985 EDITION)
1 NO. 1 CRUSHED STONE OR CRUSHED GRAVEL WITH A GRADATION CONFORMING WITH NYSDOT
SECTION 703-02. THE MATERIAL SHALL BE WELL GRADED WITH NO PARTICLES LARGER THAN ONE
INCH AND HAVING A MAXIMUM GRADATION MEETING THE LIMITS DESCRIBED IN THE GRADE TYPICAL PIPE OUTLET W/END SECTION & RIP RAP
SPECIFICATIONS. THE BEDDING SHALL BE COMPACTED IN 6" LIFTS WITH EQUIPMENT
ACCEPTABLE TO THE PIPE MANUFACTURER.
1425 & 1475 Orchard Park Rd
NO SLAG SHALL BE ALLOWED FOR MATERIAL 1
8" DIA. INLINE YARD DRAIN WITH "STANDARD" GRATE
2 TYPE 2 CRUSHED STONE OR CRUSHED GRAVEL WITH A GRADATION CONFORMING WITH NYSDOT
6"
SECTION 304-2.02 TYPE 2. THE MATERAIL SHALL BE WELL GRADED WITH NO PARTICLES LARGER THAN
TWO INCHES AND HAVING A MAXIMUM GRADATION MEETING THE LIMITS DESCRIBED IN THE
SPECIFICATIONS. THE BEDDING SHALL BE COMPACTED IN 6" LIFTS WITH EQUIPMENT
© CARMINA WOOD DESIGN
ACCEPTABLE TO THE PIPE MANUFACTURER.
HYDROSEED
West Seneca, NY
3H
NO SLAG SHALL BE ALLOWED FOR MATERIAL 2 YARD DRAINS SHALL BE 1V NOTES:
NYLOPLAST AMERICA INC. OR APPROVED EQUAL MAX. PONDING/
OVERFLOW ELEV. 1. FILTER FABRIC TO BE NON-WOVEN CLASS 'C', MIRAFI 180-N OR
RIM OF YD
6" PONDING HEIGHT
EL. 673.50 APPROVED EQUIVALENT
EL. 673.00 2. DRAINAGE GRAVEL TO MEET AASHTO M-43. NO.67, SIZE 0.25" TO
0.75"
STORM SEWER TRENCH SECTION 3. CONTRACTOR TO PROVIDE PLANTING SOIL SUBMITTAL
SPECIFICATION FOR REVIEW AND APPROVAL PRIOR TO
HDPE RISER PIPE
IN PAVED AREAS CONSTRUCTION.
4. BIORETENTION SOIL IS NOT TO BE INSTALLED UNTIL SITE IS
STABILIZED.
30" MIN. PLANTING SOIL DEPTH
PLANTING SOIL BED NOTE:PLANTING SOIL SHALL BE LOAM/SAND MIX CONTAINING A
MINIMUM OF 35 TO 60% SAND BY VOLUME AND LESS THAN 25% CLAY.
SOIL SHOULD FALL WITHIN USCS TYPES SM OR ML WITH PERMEABILITY
OF AT LEAST 1.0 FEET PER DAY. SOIL SHOULD BE FREE FROM STONES,
6/15/26
STUMPS, ROOTS OR OTHER WOODY MATERIAL OVER 1" IN DIAMETER.
Date
6" PERFORATED HDPE PLACEMENT OF THE PLANTING SOIL SHOULD BE IN LIFTS OF 12" TO
UNDERDRAIN IN 10" EL. 670.50 18", LOOSELY COMPACTED.
6" TOPSOIL (MIN.) 90° HDPE ELBOW DRAINAGE GRAVEL JACKET
EL. 669.67 CHARACTERISTICS SHALL BE:
PH RANGE: 5.2 - 7.00
NOTE: ORGANIC MATTER: 1.5 - 4.0%
FILTER FABRIC
Per Engineering comments
FOR INLINE DRAINS, THE ELBOW SHALL 6" PHDPE SUBGRADE OR EX. MAGNESIUM: 35 LBS PER ACRE MIN.
BE REPLACED BY A TEE SOIL PHOSPHORUS: 75 LBS PER ACRE MIN.
UNDERDRAIN DRAINAGE GRAVEL
EXCAVATED FROM TRENCH
POTASSIUM: 85 LBS PER ACRE MIN.
BACKFILL WITH MATERIAL
DETECTABLE TAPE, 1'-6"
BELOW FINISHED GRADE PIPE @ 0.0% SOLUBLE SALTS: 500 PPM
TRENCH WIDTH
HDPE PIPE, SEE PLAN FOR SIZE & SLOPE CLAY: 10 TO 25%
(I.D. + 24")
SILT: 30 TO 55%
BIORETENTION AREA #1 & #2 - TYPICAL SECTION
No. Description
SAND: 35 TO 60%
2
REVISIONS:
NOTE:
SEE TYPICAL TRENCH SECTION FOR BEDDING REQUIREMENTS
bio-retention area seeding spec (Northeast Wetland Grass Seed Mix):
1
12" (I.D.) 12"
Seed Mixture Variety Percent by No. of Seeds
Creeping Bentgrass Agrostis stolonifera 63.0
TOP OF PIPE ZONE
TYPICAL YARD DRAIN DETAIL Rough Bluegrass
Meadow Foxtail
Poa trivialis
Alopecurus arundinaceus
17.0
11.0
12"
Annual Ryegrass Lolium multiflorum 4.5
1 Deertongue Panicum clandestinum 4.5
.
O.D.
IA
.)
D
D
(I.
3H
(6"MIN.) BASIN GRADE
1/3 I.D.
(12"MAX.) HEAVY DUTY FRAME 1V
AND GRATE, NEENAH
R4832B, HS20-44,
BICYCLE PROOF
NOTES:
RIM 674.80
A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS. TOP OF POND 3:1 (H:V) MAX
3H ELEV. 675.30 SIDE SLOPE
BASIN GRADE 10'
B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING. 1V
C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL
PLACEMENT AND MAXIMUM PAY LIMITS.
PRECAST CONCRETE SPILLWAY ELEV.
D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL
CATCH BASIN UNIT, 674.80
BE USED IN ALL UNSHEETED TRENCH AREAS.
KISTNER CB-2436 6" 2'-0" 6"
OR EQUAL MIN.
6" FREEBOARD 100-YR FLOOD
MATERIALS ELEV. 674.73 DRAWING NAME:
12" LIGHT STONE
PIPE BEDDING MATERIAL (NYSDOT 1985 EDITION)
FLOW
INV 668.93 8" HDPE OUTLET PIPE
FILL RIP-RAP Drainage Details
1 NO. 1 CRUSHED STONE OR CRUSHED GRAVEL WITH A GRADATION CONFORMING WITH NYSDOT
SECTION 703-02. THE MATERIAL SHALL BE WELL GRADED WITH NO PARTICLES LARGER THAN ONE INV. 668.93
(SEE PLAN)
EMERGENCY SPILLWAY DETAIL
INCH AND HAVING A MAXIMUM GRADATION MEETING THE LIMITS DESCRIBED IN THE
SUMP
SPECIFICATIONS. THE BEDDING SHALL BE COMPACTED IN 6" LIFTS WITH EQUIPMENT INV 669.00
ACCEPTABLE TO THE PIPE MANUFACTURER. END SECTION 17 LF 8" HDPE @ 0.5%
BOTTOM OF CB 667.93 NOT TO SCALE
6"
NO SLAG SHALL BE ALLOWED FOR MATERIAL 1
Date: 5/22/26
2 BACKFILL MATERIAL SHALL BE NATIVE SOIL CONTAINING NO UNSUITABLE MATERIAL
COMPACTED IN 6" LIFTS.
Drawn By: A. Pandolfe
6" COMPACTED NYSDOT Scale: As Noted
TYPE 2 R.O.C. STONE BASE
NYSDOT ITEM 304.12 DRAWING NO.
STORM SEWER TRENCH SECTION
IN UNPAVED AREAS DETENTION BASIN OUTLET STRUCTURE
NOT TO SCALE
C-303
Project No: 23-4121
Page 1151 of 1493
Page 1152
EX. PIN CB
UE
RIM:683.34
G
APPROX. LOCATION
W
N. INV:672.94 (18")
ST
S. INV:673.10 (18")
SA
CB
OE
" RIM:680.53
32
UE
8'- N. INV:671.23 (18")
EX 5' N .ST
-5 CB
G
°
5.2 32' E OE
00 S. INV:671.23 (18")
.N .
RIM:685.39
0W.
1
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
AI
N. INV:677.49 (18")
L
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
87°-09'-45" S. INV:677.49 (16")
Greensboro
E. INV:676.99 (4")
UE
SA G
UE
OR
T MH
LO
W
T. RIM:685.89
BI
UE
NW. INV:676.14 (12")
CH
SE. INV:676.22 (12")
UE
1 .0
PP .
G OE
AR
SW
SA
'E
PRO
T
UE
PO W/A F.F.E
EX. REBAR
SED TT . =
Utica
4.11' N.
1-S ACH 681
D
N
UE
TO ED .60
O
RY GA
TI
5-U RAG
UE
CA
NIT ES
G E
PA
LO
O
BU
W
113°-18'-53"
ILD
X.
IN
G#
O
SA S
PR
2
RK
Buffalo
UE
UE
AP
T OE
PROPOSED 1-STORY 4-UNIT BUILDING #3
G
EX. PIN
#1
W/ATTACHED GARAGES
W
RO
ING
F.F.E. = 681.15
ILD
UE
PP 8' E.SA GSW
BU
IT S
0.
UN RAGE
PROPOSED 1-STORY 4-UNIT BUILDING #4
UE
- 4
RY GA
TO ED .80
1-S ACH = 684
AD
E D T
OS AT .E.
W/ATTACHED GARAGES
EX 9' N
OP W/ F.F
UE
OE
PR
5.8 /L
F.F.E. = 680.40
.R .
T
±O
EB
STOP
(6
AR
UE
UE
6 .0'
SA SOE
OE
)
UE
UE
PP
G
T
OE PP
OE 1.0' E.
OE
W
OE EX. IP.
14
11
OE
3.8
5°
PP 7.27' NW.
NW. COR. LOT 417
-0
UE
6'
4
PARKING
OE
Multifamily Development
MS
'-4
STOP LOT
7"
OE
SA W
.
S. LINE LOT 369
G
W
ST
12"
UE
EX. IP. A
RE
OE
. A
N. INV: 660.98 (18" HDPE) BIT
675 12" 170°-37'-13"
OE
89°-57'-36" 674
673
672 APPROX. LOCATION HYD
671 CONTRACTOR TO VERIFY LIMITS OF
WG
670 OF CEMETERY CEMETERY AND NOTIFY DESIGN
SA S
UE
ENGINEER OF ANY POTENTIAL CONFLICTS
HEAD STONES NOT
LOCATED
T OE
673.50
127°-49'-44"
673.50
14"
28"
14"
UE
EX. IP.
W. INV: 682.97
(12" HDPE)
ST
23"
UE
1425 & 1475 Orchard Park Rd
COM
12"
PARKING
S. INV: 662.31 (18" HDPE) LOT
UE
EX. IP.
.
O/L STOP PART OF MS
146°-28'-21" D.&
W. LINE LOT 417
1'
UE
© CARMINA WOOD DESIGN
L-11442, P-836 29
9.7
West Seneca, NY
UE
38"
PROPOSED 1-STORY 6 UNIT BUILDING #6
UE
EXCEPTION
COM
30"
PROPOSED 1-STORY 6 UNIT BUILDING #5
W/ATTACHED GARAGES
149°-26'-50"
11" L-3327
W/ATTACHED GARAGES
F.F.E. = 682.80
F.F.E. = 682.80
10 24" EX. IP. P-87
PARKING 3. 2.04' NW.
UE
LOT 00
' D.
&
M
S.
SCRUB SHRUB WETLANDS (PSS) 36"
33
UE
(APPROXIMATE LOCATION) 153°-18'-56" 8.
"
0'
6/17/26
14"
10
D.
6'-
&
°-4
Date
24" M
S.
89
8"
UE
S.
113°-43'-57"
'M
18"
00
Per Engineering comments
3.
11
UE
COM
5"
T
A ND
BR
UE
N E.
EX. REBAR
No. Description
LI
S.
N.
M
EXCEPTION
.&
REVISIONS:
'D
8" 12" 11"
O/L
L-3036
70
2.
12" 6" 8" 12"
26
7" P-217
20" 6"
& 89'
1
S.
6" 12"
D. 72.
M
6" 13"
6"
0')
EX. IP.
133°-32'-58"
0.
12.33' W.
(7
COM
EX. IP.
3.20' S.
275.56' D. & MS.
AD
87°-23'-54"
RO
20"
N. INV: 669.78 (18" HDPE)
RG
PROPOSED UTILITY LEGEND
Overall Utility Plan
BE
PROPOSED STORM SEWER ST
SCALE: 1"=50'
PROPOSED SANITARY SEWER 6" SA
UTILITY NOTES: NOTES: 1" W
PROPOSED WATERLINE
1. FOR ALL SANITARY SEWERS, INSTALL SELECT FILL IN PAVED AREAS, EXTEND 5' MIN. BEYOND PAVEMENT LIMITS 1. ALL SANITARY SEWER CONSTRUCTION SHALL CONFORMTOWNTOOF WEST SENECA SEWER
SPECIFICATIONS AND DETAILS, AND ERIE COUNTY DEPARTMENT OF HEALTH RULES AND
2. BUILDINGS TO HAVE6"AHOUSE TRAP, VENT AND CLEANOUT INSTALLED AT ENTRANCE POINT. INVERT ELEVATION REGULATIONS. PROPOSED CATCH BASIN CB
TO BE5' MIN.BELOW F.F.E. OF THE BUILDING. PIPE TO
6" SDR-35
BE PVC @ 1.0% MIN WITH MIN 4' OF COVER. ADD
ADDITIONAL CLEANOUTS @ 100' MAX. SPACING 6" LATERALS
FOR OVER 90' IN LENGTH. 2. PRIOR STARTING ANY WORK ASSOCIATED WITH OR NEAR EXISTING SANITARY MANHOLES,
THE CONTRACTOR SHALL MEET WITHTOWN
THE OF WEST SENECA
TO DISCUSS AND AGREE PROPOSED YARD DRAIN YD DRAWING NAME:
3. COORDINATE GAS & ELEC. METER BANK LOCATIONS ON BUILDINGS WITH M.E.P. PLANS & UTILITY CO.'S. TO THE WORK.
4. COORDINATE LOCATION OF CTV & TELEPHONE SERVICE TO BUILDINGS WITH M.E.P. PLANS AND UTILITY CO.'S. 3. FILL SHALL BE PLACED AND SATISFACTORILY COMPACTED PRIOR TO INSTALLATION OF PROPOSED MANHOLE MH Overall Utility Plan
UTILITIES, AND MUST BE APPROVED BY THE SUPERVISING PROJECT ENGINEER.
5. ANY EXISTING UTILITIES WHICH ARE TO BE ABANDONED AND FALL UNDER PAVEMENT OR BUILDINGS SHALL BE
REMOVED VS. BEING ABANDONED UNLESS THOSE UTILITIES ARE FILLED WITH FLOWABLE FILL. 4. ALL OTHER REQUIRED PERMITS BY THE STATE OF NEW YORK, COUNTY OFTOWN
ERIE AND PROPOSED HYDRANT ASSEMBLY
OF WEST SENECA
ARE THE RESPONSIBILITY OF THE CONTRACTOR/DEVELOPER.
6. EXISTING GAS SERVICES TO REMAIN UNLESS OTHERWISE NOTED. ANY PORTIONS TO BE RELOCATED SHALL BE
COORDINATED WITH NATIONAL FUEL GAS. PROPOSED GATE VALVE GV
7. ALL UNDERGROUND TELEPHONE SERVICES SHALL REMAIN AND BE PROTECTED DURING CONSTRUCTION.
NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A Date: 5/22/26
3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE Drawn By: A. Pandolfe
8. A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES OF VERTICAL SEPARATION MUST BE MAINTAINED BETWEEN ALL COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE Scale: As Noted
SANITARY SEWER AND WATER SERVICES. BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK.
DRAWING NO.
9. ERIE COUNTY WATER AUTHORITY (ECWA) IS TO BE NOTIFIED A MINIMUM OF 48-HOURS PRIOR TO STARTING THE
CONNECTION TO THE NEW WATER SERVICE.
10. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM, SANITARY) THAT CROSS THROUGH
PAVEMENT AREAS.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
50 0 50 100Ft.
C-400
50' Project No: 23-4121
Page 1152 of 1493
Page 1153
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
UE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
G
UE
EX. PIN CB
W
RIM:683.34
APPROX. LOCATION
G
N. INV:672.94 (18")
ST
UE
S. INV:673.10 (18")
Utica
OE
SA
CB
W
" RIM:680.53
G
' - 32
UE
8 N. INV:671.23 (18")
EX 5A' N .
-5 CB
OE
°
ST W
5.2 S 2' E OE
Buffalo
0 S. INV:671.23 (18")
.N .
10 RIM:685.39
0.3G
AI
N. INV:677.49 (18")
L
UE
87°-09'-45" S. INV:677.49 (16")
EX. UTILITY POLE TO BE RELOCATED. E. INV:676.99 (4")
W
CONTRACTOR TO COORDINATE WITH
STG
OR
UTILITY COMPANY.
UE
SA
O T MH
OE
T .L RIM:685.89
BI
W
NW. INV:676.14 (12")
C
G
UE
HEATED ENCLOSURE SE. INV:676.22 (12")
6" TAPPING SLEEVE
HA
FOR 6" RPZ & METER
SA
& VALVE (BY ECWA)
1.0
W
PP .
OE
6"-45° BENDS
G
'E
UE
PRO
ST
Multifamily Development
PO W/A F.F.E
EX. REBAR
RD
SED TT . =
4.11' N. WATERTIGHT CONNECTION
1-S ACH 681
W
OE
TO EX. MH, INV 676.30
TO ED .60
SA
G
UE
R Y GA
6" AWWA C-900 PVC WATER
5-U RAG
MAIN (MIN. 5' COVER)
NIT ES
PA
BU
W
113°-18'-53"
OE
ILD
UE
G
IN
338 LF 3" FUSED HDPE PRIVATE
G#
FORCE MAIN (MIN. 4' COVER)
SA
2
RK
INV 679.80
SWT
OE
REDUCE TO 2"
PROPOSED 1-STORY 4-UNIT BUILDING #3
UE
18" MIN. VERTICAL 34 LF 8" SDR-35
G
DOMESTIC SERVICE INSTALL C.O., TRAP AND
INSIDE BUILDING EX. PIN SEPARATION (TYP.) PVC PRIVATE SAN
VENT1 IN GREENSPACE SAN MH 1
W/ATTACHED GARAGES
# SEWER @ 0.4%
RO
ING 44 LF 6" SDR-35 PVC C.O. RIM 684.10
SA GS
1425 & 1475 Orchard Park Rd
F.F.E. = 681.15
6"x6"x4" TEE I L D
OE
PP ' E.
INV 675.60
W
6" STM INV 680.54 BU SANITARY SEWER INV 680.10 NW
UE
4" GATE VALE IT GES
0.8
3" SAN INV 679.29 U N INV 679.36 SW
PROPOSED 1-STORY 4-UNIT BUILDING #4
A LATERAL @ 1.0% MIN.
Y-4 GAR 0
T
4" AWWA C-900 R INV 676.44 NE
INSTALL C.O., TRAP AND PVC DOMESTIC TO ED .8
1-S ACH = 684
AD
VENT IN GREENSPACE WATER SERVICE D
SE TT .
OE
W/ATTACHED GARAGES
PO W/A F.F.E
W
EX 9' N
UE
(MIN. 5' COVER) O
PR
SA
5.8 /L W G
G
F.F.E. = 680.40
92 LF 6" SDR-35 PVC SANITARY
.R .
±OST E
SEWER LATERAL @ 1.0% MIN.
© CARMINA WOOD DESIGN
EB
REDUCE TO 2" STOP REDUCE TO 2"
DOMESTIC SERVICE
(6
DOMESTIC SERVICE
West Seneca, NY
AR
O
4" AWWA C-900
UE
INSIDE BUILDING 6" STM INV 677.12 INSIDE BUILDING
6" SAN INV 675.20 PVC DOMESTIC
INV 674.15
6.0
WATER SERVICE
SA
6"x4" REDUCER INSTALL C.O., TRAP AND 6"x6"x4" TEE (MIN. 5' COVER)
HYDRANT 12" STM INV 676.98
4" GATE VALE VENT IN GREENSPACE 4" GATE VALE
UE
ASSEMBLY 6" SAN INV 675.04
ST
REDUCE TO 2" 6"-45° BENDS 47 LF 6" SDR-35 PVC SANITARY
W
4"-45° BENDS
')
OE
DOMESTIC SERVICE SEWER LATERAL @ 2.4% MIN. 6" AWWA C-900 PVC WATER 6"-22.5° OE
6"x6"x6" TEE & (2) PP
G
INSIDE BUILDING 4" AWWA C-900 PVC DOMESTIC MAIN (MIN. 5' COVER) BEND OE
OE
PP
SERVICE (MIN. 5' COVER) 6" GATE VALVES OE
12" STM INV 674.98 OE 1.0' E.
SA
UE
INV 673.15 4"-45° BENDS OE
6" SAN INV 673.86 OE
OE EX. IP.
11
18" MIN. VERTICAL OE
WT
INSTALL C.O., TRAP AND 8" STM INV 680.18 OE
S
OE
SEPARATION (TYP.)
5°
VENT IN GREENSPACE 4" GATE VALE 3" SAN INV 678.47
PP 7.27' NW.
OE
-0
G
4'- SA
COORDINATE GAS, CTV AND ELECTRIC
PARKING
SAN MH 2
47
6"x6"x4" TEE
STOP
6/17/26
6"-22.5° PUMP STATION UTILITY LOCATION AND SIZE WITH LOT
"
W
OE
OE
UTILITY COMPANIES AND MEP DRAWINGS
Date
202 LF 8" SDR-35 BEND RIM 682.40
15 LF 6" SDR-35 PVC SANITARY
G
C.O. INV 678.40 NE
ST
SEWER LATERAL @ 1.0% MIN. C.O. SAN MH 5 PVC PRIVATE SAN
RIM 678.00 SEWER @ 0.4%12" INV 674.68 N
A W
4" AWWA C-900 PVC DOMESTIC INV 670.68 W, SW
RE
OE
71 LF 6" SDR-35 PVC SANITARY INV 673.68 N
A
OE
W
SERVICE (MIN. 5' COVER) SEWER LATERAL @ 1.0% MIN. INV 671.59 W COORDINATE GAS, CTV AND ELECTRIC 6" AWWA C-900 PVC DOMESTIC .
WATER (MIN. 5' COVER) BIT
Per Engineering comments
SA
INV 671.49 E UTILITY LOCATION AND SIZE WITH
UTILITY COMPANIES AND MEP DRAWINGS 12" 170°-37'-13"
71 LF 6" SDR-35 PVC SANITARY
OE
HYD
ST G E
SEWER LATERAL @ 1.0% MIN. APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF
O
W
OF CEMETERY CEMETERY AND NOTIFY DESIGN
18" STM INV 674.00 ENGINEER OF ANY POTENTIAL CONFLICTS
HEAD STONES NOT
No. Description
8" SAN INV 672.50
SA
673.50 LOCATED 127°-49'-44"
G
OE
REVISIONS:
W
673.50
ST
14" 6"-22.5°
28" BEND
14"
1
EX. IP.
W. INV: 682.97
180 LF 8" SDR-35
4" AWWA C-900 PVC PVC PRIVATE SAN
(12" HDPE)
18" MIN. VERTICAL DOMESTIC SERVICE SEWER @ 0.4%
Utility Plan - North
SCALE: 1"=30' PROPOSED UTILITY LEGEND
PROPOSED STORM SEWER ST
PROPOSED SANITARY SEWER 6" SA
UTILITY NOTES: NOTES: 1" W
PROPOSED WATERLINE
1. FOR ALL SANITARY SEWERS, INSTALL SELECT FILL IN PAVED AREAS, EXTEND 5' MIN. BEYOND PAVEMENT LIMITS 1. ALL SANITARY SEWER CONSTRUCTION SHALL CONFORMTOWNTOOF WEST SENECA SEWER
SPECIFICATIONS AND DETAILS, AND ERIE COUNTY DEPARTMENT OF HEALTH RULES AND
2. BUILDINGS TO HAVE6"AHOUSE TRAP, VENT AND CLEANOUT INSTALLED AT ENTRANCE POINT. INVERT ELEVATION REGULATIONS. PROPOSED CATCH BASIN CB
TO BE5' MIN.BELOW F.F.E. OF THE BUILDING. PIPE TO
6" SDR-35
BE PVC @ 1.0% MIN WITH MIN 4' OF COVER. ADD
ADDITIONAL CLEANOUTS @ 100' MAX. SPACING 6" LATERALS
FOR OVER 90' IN LENGTH. 2. PRIOR STARTING ANY WORK ASSOCIATED WITH OR NEAR EXISTING SANITARY MANHOLES,
THE CONTRACTOR SHALL MEET WITHTOWN
THE OF WEST SENECA
TO DISCUSS AND AGREE PROPOSED YARD DRAIN YD DRAWING NAME:
3. COORDINATE GAS & ELEC. METER BANK LOCATIONS ON BUILDINGS WITH M.E.P. PLANS & UTILITY CO.'S. TO THE WORK.
4. COORDINATE LOCATION OF CTV & TELEPHONE SERVICE TO BUILDINGS WITH M.E.P. PLANS AND UTILITY CO.'S. 3. FILL SHALL BE PLACED AND SATISFACTORILY COMPACTED PRIOR TO INSTALLATION OF PROPOSED MANHOLE MH Utility Plan - North
UTILITIES, AND MUST BE APPROVED BY THE SUPERVISING PROJECT ENGINEER.
5. ANY EXISTING UTILITIES WHICH ARE TO BE ABANDONED AND FALL UNDER PAVEMENT OR BUILDINGS SHALL BE
REMOVED VS. BEING ABANDONED UNLESS THOSE UTILITIES ARE FILLED WITH FLOWABLE FILL. 4. ALL OTHER REQUIRED PERMITS BY THE STATE OF NEW YORK, COUNTY OFTOWN
ERIE AND PROPOSED HYDRANT ASSEMBLY
OF WEST SENECA
ARE THE RESPONSIBILITY OF THE CONTRACTOR/DEVELOPER.
6. EXISTING GAS SERVICES TO REMAIN UNLESS OTHERWISE NOTED. ANY PORTIONS TO BE RELOCATED SHALL BE
COORDINATED WITH NATIONAL FUEL GAS. PROPOSED GATE VALVE GV
7. ALL UNDERGROUND TELEPHONE SERVICES SHALL REMAIN AND BE PROTECTED DURING CONSTRUCTION.
NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A Date: 5/22/26
3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE Drawn By: A. Pandolfe
8. A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES OF VERTICAL SEPARATION MUST BE MAINTAINED BETWEEN ALL COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE Scale: As Noted
SANITARY SEWER AND WATER SERVICES. BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK.
DRAWING NO.
9. ERIE COUNTY WATER AUTHORITY (ECWA) IS TO BE NOTIFIED A MINIMUM OF 48-HOURS PRIOR TO STARTING THE
CONNECTION TO THE NEW WATER SERVICE.
10. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM, SANITARY) THAT CROSS THROUGH
PAVEMENT AREAS.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-401
Project No: 23-4121
30'
Page 1153 of 1493
Page 1154
6"-22.5° STOP PUMP STATION UTILITY LOCATION AND SIZE WITH
OE
RIM 682.40 UTILITY COMPANIES AND MEP DRAWINGS
15 LF 6" SDR-35 PVC SANITARY 202 LF 8" SDR-35 BEND
C.O. C.O. SAN MH 5 INV 678.40 NE
UE
SEWER LATERAL @ 1.0% MIN. PVC PRIVATE SAN
RIM 678.00 SEWER @ 0.4%12" INV 674.68 N
4" AWWA C-900 PVC DOMESTIC INV 670.68 W, SW EA
OE
71 LF 6" SDR-35 PVC SANITARY INV 673.68 N R
SERVICE (MIN. 5' COVER) SEWER LATERAL @ 1.0% MIN. INV 671.59 W COORDINATE GAS, CTV AND ELECTRIC 6" AWWA C-900 PVC DOMESTIC .A
BIT
UE
INV 671.49 E UTILITY LOCATION AND SIZE WITH WATER (MIN. 5' COVER)
170°-37'-13"
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
675
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
674 71 LF 6" SDR-35 PVC SANITARY UTILITY COMPANIES AND MEP DRAWINGS 12"
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
OE
673
Greensboro
672 SEWER LATERAL @ 1.0% MIN. APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF
671
670 OF CEMETERY CEMETERY AND NOTIFY DESIGN
UE
18" STM INV 674.00 ENGINEER OF ANY POTENTIAL CONFLICTS
8" SAN INV 672.50 HEAD STONES NOT
673.50 LOCATED 127°-49'-44"
UE
673.50 6"-22.5°
14" BEND
28"
14"
Utica
UE
W. INV: 682.97
180 LF 8" SDR-35
4" AWWA C-900 PVC PVC PRIVATE SAN
(12" HDPE)
18" MIN. VERTICAL DOMESTIC SERVICE
UE
Buffalo
SEWER @ 0.4%
SEPARATION (TYP.) 12" STM INV 677.07 (MIN. 5' COVER)
8" SAN INV 674.74 COORDINATE GAS, CTV AND ELECTRIC
SAN MH 4
RIM 680.00 6" AWWA C-900 PVC WATER UTILITY LOCATION AND SIZE WITH
UE
6"x4" REDUCER
INV 672.48 E MAIN (MIN. 5' COVER) 6"-45° BEND UTILITY COMPANIES AND MEP DRAWINGS
8"x6" WYE 6"x6"x4" TEE 8"x6" WYE PARKING
4"-45° BENDS INV 672.62 INV 672.10
LOT
UE
HYDRANT
ASSEMBLY
UE
11 LF 6" SDR-35 PVC SANITARY
STOP 11 LF 6" SDR-35 PVC SANITARY SAN MH 3
PART OF
4" GATE VALE SEWER LATERAL @ 1.0% MIN. SEWER LATERAL @ 1.0% MIN. RIM 686.00 146°-28'-21"
4" GATE VALE INV 671.50 W
L-11442, P-836
UE
INSTALL C.O., TRAP AND INV 671.40 NE
VENT IN GREENSPACE INSTALL C.O., TRAP AND
Multifamily Development
VENT IN GREENSPACE
INV 673.80 246 LF 8" SDR-35
REDUCE TO 2" INV 673.30
UE
PVC PRIVATE SAN REDUCE TO 2"
DOMESTIC SERVICE SEWER @ 0.4% DOMESTIC SERVICE
INSIDE BUILDING INSIDE BUILDING
UE
PROPOSED 1-STORY 6 UNIT BUILDING #6
UE
PROPOSED 1-STORY 6 UNIT BUILDING #5
W/ATTACHED GARAGES
149°-26'-50"
W/ATTACHED GARAGES
UE
F.F.E. = 682.80
F.F.E. = 682.80
1425 & 1475 Orchard Park Rd
PARKING
UE
LOT
UE
SCRUB SHRUB WETLANDS (PSS)
© CARMINA WOOD DESIGN
(APPROXIMATE LOCATION)
West Seneca, NY
153°-18'-56"
UE
8"
UE
UE
UE
6/17/26
Date
UE
UE
Per Engineering comments
8" 12" 11"
6" 8"
No. Description
7" 12"
6"
REVISIONS:
6" 6" 12"
13"
1
6"
133°-32'-58"
PROPOSED UTILITY LEGEND
PROPOSED STORM SEWER ST
Utility Plan - South PROPOSED SANITARY SEWER 6" SA
UTILITY NOTES: NOTES:
SCALE: 1"=30' 1" W
PROPOSED WATERLINE
1. FOR ALL SANITARY SEWERS, INSTALL SELECT FILL IN PAVED AREAS, EXTEND 5' MIN. BEYOND PAVEMENT LIMITS 1. ALL SANITARY SEWER CONSTRUCTION SHALL CONFORMTOWNTOOF WEST SENECA SEWER
SPECIFICATIONS AND DETAILS, AND ERIE COUNTY DEPARTMENT OF HEALTH RULES AND
2. BUILDINGS TO HAVE6"AHOUSE TRAP, VENT AND CLEANOUT INSTALLED AT ENTRANCE POINT. INVERT ELEVATION REGULATIONS.
TO BE5' MIN.BELOW F.F.E. OF THE BUILDING. PIPE TO
6" SDR-35
BE PVC @ 1.0% MIN WITH MIN 4' OF COVER. ADD
PROPOSED CATCH BASIN CB
ADDITIONAL CLEANOUTS @ 100' MAX. SPACING 6" LATERALS
FOR OVER 90' IN LENGTH. 2. PRIOR STARTING ANY WORK ASSOCIATED WITH OR NEAR EXISTING SANITARY MANHOLES,
THE CONTRACTOR SHALL MEET WITHTOWN
THE OF WEST SENECA
TO DISCUSS AND AGREE DRAWING NAME:
3. COORDINATE GAS & ELEC. METER BANK LOCATIONS ON BUILDINGS WITH M.E.P. PLANS & UTILITY CO.'S. TO THE WORK.
PROPOSED YARD DRAIN YD
4. COORDINATE LOCATION OF CTV & TELEPHONE SERVICE TO BUILDINGS WITH M.E.P. PLANS AND UTILITY CO.'S. 3. FILL SHALL BE PLACED AND SATISFACTORILY COMPACTED PRIOR TO INSTALLATION OF
Utility Plan - South
UTILITIES, AND MUST BE APPROVED BY THE SUPERVISING PROJECT ENGINEER.
PROPOSED MANHOLE MH
5. ANY EXISTING UTILITIES WHICH ARE TO BE ABANDONED AND FALL UNDER PAVEMENT OR BUILDINGS SHALL BE
REMOVED VS. BEING ABANDONED UNLESS THOSE UTILITIES ARE FILLED WITH FLOWABLE FILL. 4. ALL OTHER REQUIRED PERMITS BY THE STATE OF NEW YORK, COUNTY OFTOWN
ERIE AND PROPOSED HYDRANT ASSEMBLY
OF WEST SENECA
ARE THE RESPONSIBILITY OF THE CONTRACTOR/DEVELOPER.
6. EXISTING GAS SERVICES TO REMAIN UNLESS OTHERWISE NOTED. ANY PORTIONS TO BE RELOCATED SHALL BE
COORDINATED WITH NATIONAL FUEL GAS. PROPOSED GATE VALVE GV
Date: 5/22/26
7. ALL UNDERGROUND TELEPHONE SERVICES SHALL REMAIN AND BE PROTECTED DURING CONSTRUCTION. NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A Drawn By: A. Pandolfe
3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE
8. A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES OF VERTICAL SEPARATION MUST BE MAINTAINED BETWEEN ALL COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE Scale: As Noted
SANITARY SEWER AND WATER SERVICES. BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK. DRAWING NO.
9. ERIE COUNTY WATER AUTHORITY (ECWA) IS TO BE NOTIFIED A MINIMUM OF 48-HOURS PRIOR TO STARTING THE
CONNECTION TO THE NEW WATER SERVICE.
10. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM, SANITARY) THAT CROSS THROUGH
PAVEMENT AREAS.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
C-402
Project No: 23-4121
30'
Page 1154 of 1493
Page 1155
6" TOPSOIL (MIN.)
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
DETECTABLE TAPE, 1'-6"
EXCAVATED FROM TRENCH
BACKFILL WITH MATERIAL
BELOW FINISHED GRADE
TRENCH WIDTH DETECTABLE TAPE, 1'-6"
(I.D. + 24") TRENCH WIDTH BELOW FINISHED GRADE
(I.D. + 24")
2
Utica
12" (I.D.) 12"
12" (I.D.) 12"
Buffalo
TOP OF PIPE ZONE
12"
12"
1
1
.
O.D.
IA .
.)
D
O.D.
IA
D
(I.
.)
D
D
(I.
(6"MIN.)
1/3 I.D. (6"MIN.)
(12"MAX.)
1/3 I.D.
(12"MAX.)
NOTES:
NOTES: A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS.
A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS. B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING.
Multifamily Development
B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING.
C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL
PLACEMENT AND MAXIMUM PAY LIMITS.
C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL
PLACEMENT AND MAXIMUM PAY LIMITS. D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL
BE USED IN ALL UNSHEETED TRENCH AREAS.
D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL
BE USED IN ALL UNSHEETED TRENCH AREAS.
1425 & 1475 Orchard Park Rd
UTILITY TRENCH SECTION IN PAVED AREAS
UTILITY TRENCH SECTION
IN UNPAVED AREAS
© CARMINA WOOD DESIGN
West Seneca, NY
Date
No. Description
REVISIONS:
DRAWING NAME:
Utility Details
Date: 5/22/26
Drawn By: A. Pandolfe
Scale: As Noted
DRAWING NO.
C-403
Project No: 23-4121
Page 1155 of 1493
Page 1156
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
© CARMINA WOOD DESIGN sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
670.68
8"
670.68
6"
8"
12"
8"
3 HP
16 FT
4.5 IN
60 GPM
3450 RPM
MYERS WG30H
12"
2.7
678.40
6"
6"
8"
8"
668.68
669.18
664.52
669.68
REVISIONS:
Date:
Scale:
No. Description Date
Drawn By:
1 Per Engineering comments 6/17/26 Multifamily Development
Project No:
DRAWING NO.
1425 & 1475 Orchard Park Rd
DRAWING NAME:
West Seneca, NY
Utility Details
23-4121
C-404
Buffalo Utica Greensboro
Page 1156 of 1493
As Noted
5/22/26
A. Pandolfe
Page 1157
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
© CARMINA WOOD DESIGN sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
Cleanout in Pavement/Sidewalks
Cleanout in Field/lawn areas
Non Residential and Commercial Projects
Non Residential and Commercial Projects
6" METER & RPZ INSULATED ENCLOSURE
REVISIONS:
Date:
Scale:
No. Description Date
Drawn By:
Multifamily Development
Project No:
DRAWING NO.
1425 & 1475 Orchard Park Rd
DRAWING NAME:
West Seneca, NY
Utility Details
23-4121
C-405
Buffalo Utica Greensboro
Page 1157 of 1493
As Noted
5/22/26
A. Pandolfe
Page 1158
INV 670.68 W, SW
PUMP STATION
INV 680.10 NW
INV 676.14 NW
INV 679.36 SW
INV 676.30 SW
INV 678.40 NE
INV 676.44 NE
INV 676.22 SE
INV 671.59 W
INV 673.68 N
INV 674.68 N
INV 671.49 E
EX. SAN MH
RIM 678.00
RIM 682.40
RIM 684.10
RIM 685.89
SAN MH 5
SAN MH 2
SAN MH 1
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
690 690
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
PROPOSED GRADE
685 685
SELECT FILL
Utica
F.F.E. = PROPOSED GRADE
680.40
680 680
C.O.
18" MIN.
6" STM INV 680.54
Buffalo
C.O. 6" WATER 8" STM INV 680.18 4" WATER
ELEVATION
18" STM
INV 674.00
675 675
SELECT FILL 338 LF 3" FUSED HDPE PRIVATE
FORCE MAIN (MIN. 4' COVER) 34 LF 8" SDR-35 PVC
PRIVATE SAN SEWER @ 0.4%
INSTALL C.O., TRAP AND
670 VENT IN GREENSPACE 670
INV 673.15 71 LF 6" SDR-35 PVC SANITARY
SEWER LATERAL @ 1.0% MIN. 202 LF 8" SDR-35 PVC
71 LF 6" SDR-35 PVC SANITARY PRIVATE SAN SEWER @ 0.4%
SEWER LATERAL @ 1.0% MIN.
665 665
Multifamily Development
660 660
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50
STATION
PRIVATE SANITARY SEWER - BLDG. #4 TO EX. SAN MH
1425 & 1475 Orchard Park Rd
INV 670.68 W, SW
PUMP STATION
INV 671.40 NE
INV 678.40 NE
INV 671.50 W
INV 674.68 N
INV 672.48 E
RIM 680.00
RIM 686.00
RIM 682.40
SAN MH 4
SAN MH 3
SAN MH 2
690 690 690 690
ELEVATION © CARMINA WOOD DESIGN
PROPOSED GRADE
West Seneca, NY
685 685 685 685
F.F.E. = PROPOSED GRADE
PROPOSED GRADE
682.80
12" STM INV 683.00
5' COVER MIN.
680 680 680 12" STM 680
18" MIN.
12" STM INV 678.08
INV 676.92
ELEVATION
SELECT FILL SELECT FILL
6/17/26
675 12" STM INV 677.07 4" WATER 675 675 675
Date
6"-45° BEND 6"x6"x6" TEE 6"-22.5° BEND 6"-22.5° BEND 6"x6"x6" TEE
6"x6"x4" TEE
6" AWWA C-900 PVC DOMESTIC
6"x4" REDUCER 6" GATE VALVE
6" AWWA C-900 PVC WATER WATER (MIN. 5' COVER)
4"-45° BENDS MAIN (MIN. 5' COVER)
Per Engineering comments
670 670 670 670
4" GATE VALE 8" SAN
246 LF 8" SDR-35 PVC INV 670.80
PRIVATE SAN SEWER @ 0.4% REDUCE TO 2"
180 LF 8" SDR-35 PVC
DOMESTIC SERVICE
PRIVATE SAN SEWER @ 0.4%
INSIDE BUILDING
No. Description
665 665 665 665
REVISIONS:
1
660 660 660 660
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50
STATION STATION
PRIVATE SANITARY SEWER - SAN MH 4 TO PUMP STATION PRIVATE WATER SERVICE - BLDG. #6 TO TEE
690 690
HOTBOX
PROPOSED GRADE
685 685
PROPOSED GRADE
5' COVER MIN.
18" MIN.
8" STM 6" STM
F.F.E. = INV 680.03 INV 680.42
680.40
680 680
5' COVER MIN.
18" MIN.
12" STM
18" MIN.
15" STM 6" TAPPING SLEEVE
INV 675.77
ELEVATION
INV 674.73 & VALVE (BY ECWA)
18" MIN.
6"x6"x4" TEE 6"-45° BENDS
6"x6"x4" TEE 6" AWWA C-900 PVC WATER
6" SAN
18" MIN.
675 6"-22.5° MAIN (MIN. 5' COVER) 675 DRAWING NAME:
INV 673.83 BEND 6" SAN
6"x6"x6" TEE
INV 674.87 Utility Profiles
6" AWWA C-900 PVC WATER 6"x6"x6" TEE
4" GATE VALE MAIN (MIN. 5' COVER) 6" GATE VALVE
670 6"x6"x4" TEE 670
6"-45° BENDS
4"-45° BENDS
6"x4" REDUCER
REDUCE TO 2" Date: 5/22/26
DOMESTIC SERVICE Drawn By: A. Pandolfe
665 INSIDE BUILDING 665 Scale: As Noted
DRAWING NO.
660
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00
660 C-406
Project No: 23-4121
STATION
PRIVATE WATER SERVICE - BLDG. #4 TO TAP Page 1158 of 1493
Page 1159
UE
G
W
ST
SA
OE
UE
G
W
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
ST
OE
UE
SA G
UE
W
UE
UE
G OE
SW
SA
PRO
T
UE
PO W/A F.F.E
SED TT . =
Utica
1-S ACH 681
UE
TO ED .60
RY GA
5-U RAG
UE
NIT ES
G E
O
BU
W
ILD
IN
G#
SA S
2
Buffalo
UE
UE
T OE
PROPOSED 1-STORY 4-UNIT BUILDING #3
G
#1
W/ATTACHED GARAGES
W
ING
F.F.E. = 681.15
ILD
UE
BU
IT S
UN RAGE
PROPOSED 1-STORY 4-UNIT BUILDING #4
UE
- 4
RY GA
TO ED .80
1-S ACH = 684
SA GS
E D T
OS AT .E.
W/ATTACHED GARAGES
OP W/ F.F
UE
OE
PR
F.F.E. = 680.40
W
T
STOP
UE
UE
SA SOE
OE
UE
UE
G
T
OE
OE
OE
W
OE
OE
UE
OE
Multifamily Development
COORDINATE GAS, CTV AND ELECTRIC
STOP UTILITY LOCATION AND SIZE WITH
OE
SA W
G
UTILITY COMPANIES AND MEP DRAWINGS
W
ST
UE
OE
COORDINATE GAS, CTV AND ELECTRIC
UTILITY LOCATION AND SIZE WITH
675 UTILITY COMPANIES AND MEP DRAWINGS
OE
674
673
672 CONTRACTOR TO VERIFY LIMITS OF
671
WG
670 CEMETERY AND NOTIFY DESIGN
SA S
UE
ENGINEER OF ANY POTENTIAL CONFLICTS
T OE
673.50
673.50
UE
ST
UE
1425 & 1475 Orchard Park Rd
COM
COORDINATE GAS, CTV AND ELECTRIC
UTILITY LOCATION AND SIZE WITH
UTILITY COMPANIES AND MEP DRAWINGS
UE
.
STOP MS
D.&
1'
UE
© CARMINA WOOD DESIGN
9.7
29
West Seneca, NY
UE
PROPOSED 1-STORY 6 UNIT BUILDING #6
UE
COM
PROPOSED 1-STORY 6 UNIT BUILDING #5
W/ATTACHED GARAGES
W/ATTACHED GARAGES
F.F.E. = 682.80
F.F.E. = 682.80
UE
UE
Date
UE
UE
COM
UE
No. Description
REVISIONS:
COM
Overall Landscape Plan
SCALE: 1"=50'
DRAWING NAME:
Overall Landscape
Plan
Date: 5/22/26
Drawn By: A. Pandolfe
Scale: As Noted
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
50 0 50 100Ft.
L-100
Project No: 23-4121
Reference sheets L-101, L-102 and L-103 for Enlarged Landscape Plans 50'
Page 1159 of 1493
Page 1160
WG
ST
UE
SA
WG
OE
UE
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
ST
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
3-PAcu 1-PAcu
Greensboro
WG
SA
OE
UE
2-AC
ST
WG
OE
UE
3-PAcu
SA
Utica
2-PAcu
WG
OE
UE
ST
1-AC
SA
1-PAcu
Buffalo
WG
OE
UE
ST
WG
OE
UE
SA
1-PAcu
WG
UE
OE
SA
1-PAcu
ST G
W
UE
3-PMp
P RO
OE
PO W/A F.F.E
4-QRxB
Multifamily Development
SED TT . =
SA
3-PAcu 1-GT
WG
UE
1-JCp
1-S ACH 681
ST
1-CBl 3-PMp 1-PAcu
TO ED .60
OE
RY GA 3-PFv
5-U RAG
UE
WG
NIT ES 1-AC
SA
2-PAcu
OE
BU
ILD
1-AF
UE
1-SR
WG
ING
ST
#2
OE
2-ATxP
SA
1-AC
3-AxC
UE
WG
1425 & 1475 Orchard Park Rd
OE
ST
1-SR
UE
1-PAcu
SA
WG
2-JCp
2-PAcu 6-RRr #1
NG
OE
5-CBl DI
UIL
© CARMINA WOOD DESIGN
B
UE
1-GT
NIT AGES
ST
1-AC
West Seneca, NY
WG
U
Y-4 GAR 0
SA
OE
R
O D 8
3-ATxP 1-AxC -ST ACHE 684.
UE
1
SED /ATT .E. =
WG
O
OP W F.F
OE
ST
PR
SA
UE
WG
STOP 3-QRxB 3-PAcu
OE
3-CBl
UE
ST
SA
WG
5-JCp
OE
Date
UE
2-GT 6-RRr
3-PMp
ST
SA
W G
1-AF
UE
OE
1-JCp
OE
OE
OE
OE
OE
OE
ST
OE
W G
UE
OE 1-JCp OE
SA
OE
OE
OE
OE
No. Description
OE
OE
OE
REVISIONS:
W SG
OE
T
OE
SA
OE
STOP
W G
OE
ST
OE
2-AF
SA
FOUNDATION PLANTINGS REFERENCE
W
1-PFv 1-FSs SHEET L-104
GE
1-NCs
O
(TOTAL NUMBER OF PLANTS IS
OE
1-PFv 3-AC
REFLECTED IN THE PLANT SCHEDULE W
3-VL
PLANTING PLAN IS REPRESENTED PER
ST
W
TYPE OF UNIT - 4, 5 AND/OR 6 UNITS
OE
SA
PER DWELLING)
OE
G
OE
CONTRACTOR TO VERIFY LIMITS OF
W S
LANDSCAPE NOTES:
OE
T
CEMETERY AND NOTIFY DESIGN
ENGINEER OF ANY POTENTIAL CONFLICTS 1. ALL PLANTS INSTALLED SHALL MEET OR EXCEED THE MINIMUM REQUIREMENTS AS NOTED ON THE PLANS AND IN THE LATEST EDITION ON
THE AMERICAN STANDARD FOR NURSERY STOCK, BY THE AMERICAN ASSOCIATION OF NURSERYMEN, ANSI 260.1
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN QUANTITY TAKEOFF, THE QUANTITIES SHOWN ARE A MINIMUM AND ARE FOR
REFERENCE ONLY. PLANTING NOTES:
3. THE CONTRACTOR SHALL PERFORM A ROUGH FIELD STAKEOUT OF ALL PLANTING MATERIAL LOCATIONS AND CONTACT THE OWNERS FIELD 1. ALL INTERIOR LANDSCAPED AREAS SHALL HAVE A MINIMUM PLANTING SOIL DEPTH OF THREE (3)
REPRESENTATIVE PRIOR TO ACTUALL INSTALLING. THE PLANTING MATERIAL LOCATIONS SHOWN ON THE PLANS ARE TO CONVEY THE FEET AND BE FREE FROM ALL FORMS OF CONSTRUCTION DEBRIS AND FOREIGN MATERIAL.
1-FSs DESIGN INTENT ONLY, ACTUAL LOCATIONS WILL BE FINALIZED BY THE OWNERS FIELD REPRESENTATIVE AT THE TIME OF INSTALLATION.
2. ALL TREE PIT SAUCERS, SHRUB BEDS, ORNAMENTAL GRASS BEDS, AND PERENNIAL FLOWER BEDS
4. THE CONTRACTOR IS HEREBY NOTIFIED THAT IF UNDERGROUND UTILITIES EXIST IN THE VICINITY OF THE PLANTINGS, ALL PROPOSED SHALL RECEIVE "PREEN" HERBICIDE AND THREE (3) INCHES DEPTH OF DARK SHREDDED DRAWING NAME:
PLANTINGS SHALL BE INSTALLED A MINIMUM OF 5' FROM ANY UNDERGROUND UTILITY, CONTACT THE OWNERS FIELD REPRESENTATIVE IF HARDWOOD BARK MULCH.
Landscape Plan - East 5.
PLANTINGS SHOWN ON THE PLANS VIOLATE THIS SITUATION.
ALL TREES SHALL BE INSTALLED A MINIMUM OF 20' FROM ANY OVERHEAD ELECTRIC LINES.
3. ALL SEASONAL FLOWER BEDS SHALL BE A MINIMUM OF TWELVE (12) INCHES DEEP WITH A
WELL-BLENDED MIXTURE OF 50% PEAT MOSS & 50% SCREENED TOPSOIL. SEASONAL FLOWER
Landscape
Plan - East
BEDS SHALL RECEIVE "PREEN" HERBICIDE. NO MULCH SHALL BE INSTALLED IN THE SEASONAL
SCALE: 1"=20' 6. 1 PART
PLANTING BACKFILL MIXTURE SHALL CONSIST OF 4 PARTS TOPSOIL, 1 PART PEAT
3 MOSS,
WELL ROTTED MANURE, 10 LBS 5-10-5 FLOWER BEDS.
PLANTING FERTILIZER THOROUGHLY MIXED PER CUBIC YARD.
4. ALL DECIDUOUS AND EVERGREEN TREES SHALL BE STAKED WITH THREE (3) TREE STAKES AS PER
7. STAKE AND WRAP TREES IMMEDIATELY FOLLOWING INSTALLATION. TREE PLANTING DETAIL.
8. ALL PLANTED AREAS SHALL RECEIVE A 3" LAYER OF SHREDDED PINE BARK MULCH OVER 10 MIL. WEED MAT EQUAL TO "WEEDBLOCK" BY EASY Date: 5/22/26
GARDENER OR DEWITT WEED BARRIER. Drawn By: A. Pandolfe
Scale: As Noted
9. THE AREAS ON THE PLAN TO BE SEEDED SHALL HAVE 4" MINIMUM OF TOPSOIL, DISK PLOWED, LEVELED AND HAND RAKED SMOOTH.
SURFACE SHALL BE ROLLED TO REMOVE LUMPS. DRAWING NO.
10. ALL SEEDED AREAS SHALL BE HYDROSEEDED IN ACCORDANCE WITH THE SPECIFICATION INDICATED. WHERE REQUIRED BY CLIMATIC
CONDITIONS, SLOPE OR SEASON OF PLANTING, SOD MAY BE SUBSTITUTED FOR SEEDING IN ORDER TO ACHIEVE THE REQUIRED COVERAGE.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING, MOWING AND OTHER MAINTENANCE TO SEEDED AREAS UNTIL THE PROJECT IS
ACCEPTED BY THE OWNER, THIS SHALL INCLUDE WATERING DAILY FOR 15 DAYS OR AS REQUIRED BY WEATHER CONDITIONS AND
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
20 0 20 40Ft.
L-101
RE-SEEDING OF THIN SPOTS FOLLOWING THE GERMINATION OF THE SEEDS. 20' Project No: 23-4121
Page 1160 of 1493
Page 1161
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
3-PAcu 1-PAcu
2-AC
3-PAcu
Utica
2-PAcu
3-AF
1-AC
Buffalo
1-PAcu
LANDSCAPE NOTES:
1. ALL PLANTS INSTALLED SHALL MEET OR EXCEED THE MINIMUM REQUIREMENTS AS NOTED ON THE PLANS AND IN THE LATEST EDITION ON
THE AMERICAN STANDARD FOR NURSERY STOCK, BY THE AMERICAN ASSOCIATION OF NURSERYMEN, ANSI 260.1
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN QUANTITY TAKEOFF, THE QUANTITIES SHOWN ARE A MINIMUM AND ARE FOR 13-CSd
REFERENCE ONLY.
3. THE CONTRACTOR SHALL PERFORM A ROUGH FIELD STAKEOUT OF ALL PLANTING MATERIAL LOCATIONS AND CONTACT THE OWNERS FIELD
REPRESENTATIVE PRIOR TO ACTUALL INSTALLING. THE PLANTING MATERIAL LOCATIONS SHOWN ON THE PLANS ARE TO CONVEY THE
DESIGN INTENT ONLY, ACTUAL LOCATIONS WILL BE FINALIZED BY THE OWNERS FIELD REPRESENTATIVE AT THE TIME OF INSTALLATION. 13-CSd
4. THE CONTRACTOR IS HEREBY NOTIFIED THAT IF UNDERGROUND UTILITIES EXIST IN THE VICINITY OF THE PLANTINGS, ALL PROPOSED
PRO
PLANTINGS SHALL BE INSTALLED A MINIMUM OF 5' FROM ANY UNDERGROUND UTILITY, CONTACT THE OWNERS FIELD REPRESENTATIVE IF 2-GDM
Multifamily Development
PLANTINGS SHOWN ON THE PLANS VIOLATE THIS SITUATION. 13-CSd
PO W/A F.F.E
1-CNp
SED TT . =
5. ALL TREES SHALL BE INSTALLED A MINIMUM OF 20' FROM ANY OVERHEAD ELECTRIC LINES.
1-S ACH 681
1 PART
1-CBl
6. PLANTING BACKFILL MIXTURE SHALL CONSIST OF 4 PARTS TOPSOIL, 1 PART PEAT MOSS,
WELL ROTTED MANURE, 10 LBS 5-10-5
TO ED .60
3
PLANTING FERTILIZER THOROUGHLY MIXED PER CUBIC YARD. 1-GT
RY GA
5-U RAG
7. STAKE AND WRAP TREES IMMEDIATELY FOLLOWING INSTALLATION.
NIT ES
8. ALL PLANTED AREAS SHALL RECEIVE A 3" LAYER OF SHREDDED PINE BARK MULCH OVER 10 MIL. WEED MAT EQUAL TO "WEEDBLOCK" BY EASY 3-ARr 3-PAcu
BU
GARDENER OR DEWITT WEED BARRIER.
ILD
5-JCog
IN
9. THE AREAS ON THE PLAN TO BE SEEDED SHALL HAVE 4" MINIMUM OF TOPSOIL, DISK PLOWED, LEVELED AND HAND RAKED SMOOTH. 2-CBl
G#
SURFACE SHALL BE ROLLED TO REMOVE LUMPS.
2
2-ATxP
10. ALL SEEDED AREAS SHALL BE HYDROSEEDED IN ACCORDANCE WITH THE SPECIFICATION INDICATED. WHERE REQUIRED BY CLIMATIC
1425 & 1475 Orchard Park Rd
1-SR 3-AxC
CONDITIONS, SLOPE OR SEASON OF PLANTING, SOD MAY BE SUBSTITUTED FOR SEEDING IN ORDER TO ACHIEVE THE REQUIRED COVERAGE.
3-JCp
PROPOSED 1-STORY 4-UNIT BUILDING #3
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING, MOWING AND OTHER MAINTENANCE TO SEEDED AREAS UNTIL THE PROJECT IS
ACCEPTED BY THE OWNER, THIS SHALL INCLUDE WATERING DAILY FOR 15 DAYS OR AS REQUIRED BY WEATHER CONDITIONS AND
RE-SEEDING OF THIN SPOTS FOLLOWING THE GERMINATION OF THE SEEDS.
W/ATTACHED GARAGES
© CARMINA WOOD DESIGN
F.F.E. = 681.15
West Seneca, NY
1-AC
PROPOSED 1-STORY 4-UNIT BUILDING #4
1-SR
3-ATxP 1-AxC
W/ATTACHED GARAGES
1-SR
F.F.E. = 680.40
STOP
PLANTING NOTES: 3-CBl
1. ALL INTERIOR LANDSCAPED AREAS SHALL HAVE A MINIMUM PLANTING SOIL DEPTH OF THREE (3)
FEET AND BE FREE FROM ALL FORMS OF CONSTRUCTION DEBRIS AND FOREIGN MATERIAL.
Date
2. ALL TREE PIT SAUCERS, SHRUB BEDS, ORNAMENTAL GRASS BEDS, AND PERENNIAL FLOWER BEDS 1-SR
SHALL RECEIVE "PREEN" HERBICIDE AND THREE (3) INCHES DEPTH OF DARK SHREDDED 2-GT 6-RRr
HARDWOOD BARK MULCH. 3-JCp 3-PMp
1-GT
3. ALL SEASONAL FLOWER BEDS SHALL BE A MINIMUM OF TWELVE (12) INCHES DEEP WITH A FOUNDATION PLANTINGS REFERENCE
WELL-BLENDED MIXTURE OF 50% PEAT MOSS & 50% SCREENED TOPSOIL. SEASONAL FLOWER SHEET L-104
BEDS SHALL RECEIVE "PREEN" HERBICIDE. NO MULCH SHALL BE INSTALLED IN THE SEASONAL (TOTAL NUMBER OF PLANTS IS
FLOWER BEDS. REFLECTED IN THE PLANT SCHEDULE
PLANTING PLAN IS REPRESENTED PER
4. ALL DECIDUOUS AND EVERGREEN TREES SHALL BE STAKED WITH THREE (3) TREE STAKES AS PER TYPE OF UNIT - 4, 5 AND/OR 6 UNITS
PER DWELLING)
No. Description
TREE PLANTING DETAIL.
REVISIONS:
3-JCp
1-QRxB
STOP
1-NCs
1-QB 1-AC 1-PFv 1-FSs
1-PFv 1-NCs
3-VL 3-AC
1-NCs 3-VL
1-VL 2-PFv
1-FSs
675
674
673 1-PFv
672 CONTRACTOR TO VERIFY LIMITS OF
671 1-QB 3-VL
670 CEMETERY AND NOTIFY DESIGN
ENGINEER OF ANY POTENTIAL CONFLICTS
673.50
673.50
1-PAcu
1-FSs
1-AC DRAWING NAME:
1-AC 1-QRxB
1-QB
3-PFv 3-VL 1-AC
2-GDM Landscape
1-NCs 1-QRxB
1-PFv 1-PFv
1-QRxB Plan - West
1-PAcu
1-FSs
1-PAcu 1-PAcu 1-PFv
Date: 5/22/26
Drawn By: A. Pandolfe
Scale: As Noted
DRAWING NO.
Landscape Plan - West
SCALE: 1"=20'
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
20 0 20 40Ft.
L-102
20' Project No: 23-4121
Page 1161 of 1493
Page 1162
ENGINEER OF ANY POTENTIAL CONFLICTS
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
673.50
673.50
1-PAcu
1-FSs
1-AC
1-AC 1-QRxB
1-QB
2-GDM
Utica
3-PFv 3-VL 1-AC LANDSCAPE NOTES:
1-NCs 1-QRxB 1-QRxB 1. ALL PLANTS INSTALLED SHALL MEET OR EXCEED THE MINIMUM REQUIREMENTS AS NOTED ON THE PLANS AND IN THE LATEST EDITION ON
1-PFv 1-PFv THE AMERICAN STANDARD FOR NURSERY STOCK, BY THE AMERICAN ASSOCIATION OF NURSERYMEN, ANSI 260.1
1-PAcu
Buffalo
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN QUANTITY TAKEOFF, THE QUANTITIES SHOWN ARE A MINIMUM AND ARE FOR
1-FSs REFERENCE ONLY.
1-PAcu 1-PAcu 1-PFv
3. THE CONTRACTOR SHALL PERFORM A ROUGH FIELD STAKEOUT OF ALL PLANTING MATERIAL LOCATIONS AND CONTACT THE OWNERS FIELD
REPRESENTATIVE PRIOR TO ACTUALL INSTALLING. THE PLANTING MATERIAL LOCATIONS SHOWN ON THE PLANS ARE TO CONVEY THE
DESIGN INTENT ONLY, ACTUAL LOCATIONS WILL BE FINALIZED BY THE OWNERS FIELD REPRESENTATIVE AT THE TIME OF INSTALLATION.
4. THE CONTRACTOR IS HEREBY NOTIFIED THAT IF UNDERGROUND UTILITIES EXIST IN THE VICINITY OF THE PLANTINGS, ALL PROPOSED
PLANTINGS SHALL BE INSTALLED A MINIMUM OF 5' FROM ANY UNDERGROUND UTILITY, CONTACT THE OWNERS FIELD REPRESENTATIVE IF
PLANTINGS SHOWN ON THE PLANS VIOLATE THIS SITUATION.
1-GT 1-GT 1-GBps
1-GT 5. ALL TREES SHALL BE INSTALLED A MINIMUM OF 20' FROM ANY OVERHEAD ELECTRIC LINES.
6. 1 PART
PLANTING BACKFILL MIXTURE SHALL CONSIST OF 4 PARTS TOPSOIL, 1 PART PEAT MOSS,
WELL ROTTED MANURE, 10 LBS 5-10-5
3
PLANTING FERTILIZER THOROUGHLY MIXED PER CUBIC YARD.
7. STAKE AND WRAP TREES IMMEDIATELY FOLLOWING INSTALLATION.
Multifamily Development
1-QB
1-NSW
1-GT STOP 8. ALL PLANTED AREAS SHALL RECEIVE A 3" LAYER OF SHREDDED PINE BARK MULCH OVER 10 MIL. WEED MAT EQUAL TO "WEEDBLOCK" BY EASY
GARDENER OR DEWITT WEED BARRIER.
9. THE AREAS ON THE PLAN TO BE SEEDED SHALL HAVE 4" MINIMUM OF TOPSOIL, DISK PLOWED, LEVELED AND HAND RAKED SMOOTH.
SURFACE SHALL BE ROLLED TO REMOVE LUMPS.
10. ALL SEEDED AREAS SHALL BE HYDROSEEDED IN ACCORDANCE WITH THE SPECIFICATION INDICATED. WHERE REQUIRED BY CLIMATIC
1-QB CONDITIONS, SLOPE OR SEASON OF PLANTING, SOD MAY BE SUBSTITUTED FOR SEEDING IN ORDER TO ACHIEVE THE REQUIRED COVERAGE.
2-PAcu 1-GT 1-PR
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING, MOWING AND OTHER MAINTENANCE TO SEEDED AREAS UNTIL THE PROJECT IS
ACCEPTED BY THE OWNER, THIS SHALL INCLUDE WATERING DAILY FOR 15 DAYS OR AS REQUIRED BY WEATHER CONDITIONS AND
1-NSW 1-QB RE-SEEDING OF THIN SPOTS FOLLOWING THE GERMINATION OF THE SEEDS.
1-SR
1425 & 1475 Orchard Park Rd
3-JCp 1-PGd
1-SR
3-PR
1-PR
© CARMINA WOOD DESIGN
PROPOSED 1-STORY 6 UNIT BUILDING #6
West Seneca, NY
1-PAcu
PROPOSED 1-STORY 6 UNIT BUILDING #5
1-JCp
W/ATTACHED GARAGES
2-QRn 1-PGd PLANTING NOTES:
W/ATTACHED GARAGES
F.F.E. = 682.80
1. ALL INTERIOR LANDSCAPED AREAS SHALL HAVE A MINIMUM PLANTING SOIL DEPTH OF THREE (3)
F.F.E. = 682.80
FEET AND BE FREE FROM ALL FORMS OF CONSTRUCTION DEBRIS AND FOREIGN MATERIAL.
2. ALL TREE PIT SAUCERS, SHRUB BEDS, ORNAMENTAL GRASS BEDS, AND PERENNIAL FLOWER BEDS
SHALL RECEIVE "PREEN" HERBICIDE AND THREE (3) INCHES DEPTH OF DARK SHREDDED
1-NSW HARDWOOD BARK MULCH.
1-JCp
3. ALL SEASONAL FLOWER BEDS SHALL BE A MINIMUM OF TWELVE (12) INCHES DEEP WITH A
1-PGd WELL-BLENDED MIXTURE OF 50% PEAT MOSS & 50% SCREENED TOPSOIL. SEASONAL FLOWER
2-QRn BEDS SHALL RECEIVE "PREEN" HERBICIDE. NO MULCH SHALL BE INSTALLED IN THE SEASONAL
Date
FLOWER BEDS.
4. ALL DECIDUOUS AND EVERGREEN TREES SHALL BE STAKED WITH THREE (3) TREE STAKES AS PER
TREE PLANTING DETAIL.
3-PAcu
5-JCp
1-NSW
1-SR
No. Description
REVISIONS:
1-SR
1-QB
1-PR 1-QPgp 1-QPgp
2-PGd
1-QB
FOUNDATION PLANTINGS REFERENCE
3-PAcu SHEET L-104
3-JCog 3-JCog (TOTAL NUMBER OF PLANTS IS
1-QB REFLECTED IN THE PLANT SCHEDULE
1-NSW 1-NSW PLANTING PLAN IS REPRESENTED PER
TYPE OF UNIT - 4, 5 AND/OR 6 UNITS
1-QB PER DWELLING)
1-QB 1-QB
3-PAcu
DRAWING NAME:
Landscape
Plan - South
Landscape Plan - South
SCALE: 1"=30'
Date: 5/22/26
Drawn By: A. Pandolfe
Scale: As Noted
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
30 0 30 60Ft.
L-103
Project No: 23-4121
30'
Page 1162 of 1493
Page 1163
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
OE
OE
4-WRW 1-JS 1-JS 2-JS
Utica
3-JS 3-JS
OE
6-VC 3-JS 1-JS 9-WRW 6-VC 1-JCp 3-SC 1-CKst
Buffalo
1-ALso
PROPOSED 1-STORY 5-UNIT BUILDING #2 5-VC 3-AFR
3-SC W/ATTACHED GARAGES 1-ALso 3-RO
1-IxMH
1-CKst
3-JhW
F.F.E. = 681.60 1-CKst
3-JS 1-CJbd
3-AFR 5-HQ
3-AFR 1-ALso
PROPOSED 1-STORY-4 UNIT BUILDING #1
Multifamily Development
1-IxMH 3-VC
3-RO 1-IxMH
1-JS
W/ATTACHED GARAGES
1-RO 1-RO
5-IGgb
F.F.E. = 684.80
6-NxF
6-NxF
1425 & 1475 Orchard Park Rd
1-JS
5-IGgb
3-VC
10-RAgl 1-ALso
© CARMINA WOOD DESIGN
West Seneca, NY
Foundation Planting Plan @ 5 Unit
SCALE: 1"=10' NOTE: TOTAL OF 1 - 5 UNIT COMPLEX ON SITE 3-JS
1-CJbd
1-ALso 3-RO
5-VC
3-AFR
Date
1-CKst
5-WRW 1-ALso 1-JCp
1-ALso
1-ALso 1-ALso
3-JS 4-SPn 5-WRW
No. Description
3-JS 1-ALso 4-SPn 6-CSb
REVISIONS:
3-JS 1-CNp
1.0' E.
PROPOSED 1-STORY 6 UNIT BUILDING #6
W/ATTACHED GARAGES Foundation Planting Plan @ 4 Unit
3-JhW
1-CKst
1-IxMH F.F.E. = 682.80 1-CNp SCALE: 1"=10' NOTE: TOTAL OF 3 -4 UNIT COMPLEX(S) ON SITE
1-IxMH
3-JhW 5-HQ 1-CKst
3-AFR
3-AFR
3-RO
1-IxMH 1-IxMH
3-RO
1-RO 1-RO
DRAWING NAME:
Foundation
Planting Plan
10-RAgl
Date: 5/22/26
Drawn By: A. Pandolfe
Scale: As Noted
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
DRAWING NO.
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
Foundation Planting Plan @ 6 Unit 10 0 10 20Ft.
L-104
10'
SCALE: 1"=10' NOTE: TOTAL OF 2 - 6 UNIT COMPLEX(S) ON SITE
Project No: 23-4121
Page 1163 of 1493
Page 1164
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
Plant Schedule -Multi-Family Development 1425 & 1475 Orchard Park Road-West Seneca, New York
KEY QTY. BOTANICAL NAME COMMON NAME MIN. SIZE REMARKS
QB 12 Quercus bicolor Swamp White Oak 2 1/2" - 3" CAL. B&B, HT. 60', W 40'
PRUNE AS SPECIFIED AND
GT 11 Gleditsia triacanthos "Draves" Street Keeper Honey Locust 2 1/2" - 3" CAL. B&B, HT. 40', W 35' DETAILED PRUNE ONLY DAMAGED OR
Utica
AxC 4 Aesculus x carnea 'Briotii' Red Horse Chestnut 2 1/2" - 3" CAL. B&B, HT. 60', W 40' BROKEN BRANCHES
DRIVE STAKES INTO SUBGR. AS
ARr 3 Acer rubrum 'Frank Jr.' Redpointe Maple 2 1/2" - 3" CAL. B&B, HT. 40', W 35' SHOWN. 3/TREE OVER 5' HT. AND
2/TREE 5' HT. AND UNDER. DRIVE STAKES INTO SUBGR. AS
AF 7 Acer freemanii 'Jeffersred' Autumn Blaze Maple 2 1/2" - 3" CAL. B&B, HT. 40', W 35'
Buffalo
SHOWN. 3/TREE OVER 2'' CALIPER
QPgp 2 Quercus palustris 'Green Pillar' Green Pillar Pin Oak 2 1/2" - 3" CAL. B&B, HT. 35', W 18' HOSE AND DOUBLE STRAND WIRE AND 2/TREE 2''CALIPER AND
GUYS. SET GUYS 1/2 TO 2/3 UP UNDER.
NSW 6 Nyssa sylvatica 'Wildfire' Wildfire Tupelo 2 1/2" - 3" CAL. B&B, HT. 35', W 18'
TREE.
NCs 4 Northern catalpa 'Speciosa' Northern Catalpa 2 1/2" - 3" CAL. B&B, HT. 40', W 35' INSIDE CONTINUOUS HOSE AND DOUBLE STRAND WIRE
PLANT BED
Kindred Spirit Oak B&B, HT. 30', W 6' CONDITION
SAUCER AT INSIDE PLANT CONTINUOUS GUYS
QRn 4 Quercus robur x bicolor Nadler PP17604' 2 1/2" - 3" CAL. EDGE IN BED CONDITION SAUCER AT SET ROOT FLARE AT FINISH GRADE
GBps 1 Ginkgo biloba 'Princeton Sentry' Prnceton Sentry Ginkgo(Maidenhair Tree) 2 1/2" - 3" CAL. B&B, HT. 40', W 20' LAWN EDGE IN LAWN KEEP MULCH 2" FROM TRUNK
CONDITION CONDITION
CBl 11 Carpinus betulus 'Lucas' Lucas Columnar Hornbeam 2 1/2" - 3" CAL. B&B, HT. 50', W 30' FINISH GRADE AT SAUCER FINISH GRADE AT SAUCER
2"
2"
GDM 4 Gymnogladus dioicus 'Morton' Kentucky Coffee Tree 'Morton' 2 1/2" - 3" CAL. B&B, HT. 35', W 18' TOPSOIL
ROOT BALL MAX.
MULCH 2" - 4" DEPTH
DEPTH OF 6"
QRxB 11 Quercus robur x bicolor 'Long' Regal Prince Oak 2 1/2" - 3" CAL. B&B, HT. 35', W 18' TOPSOIL
CUT AND LAYBACK TOP 1/3
6"
MULCH 2" - 4" DEPTH
FSs 4 Fagus sylvatica 'Riversii' Rivers Purple European Beech 2 1/2" - 3" CAL. B&B, HT. 45', W 25' BURLAP FROM ROOTBALL
ATxP 5 Acer truncatum x plantanoides 'JFS-KW202' Crimson Sunset Maple 2 1/2" - 3" CAL. B&B, HT. 35', W 25' CUT AND LAY BACK TOP 1/3 PLANTING SOIL MIXTURE
Multifamily Development
BURLAP FROM ROOT BALL
6"
PLANTING SOIL MIXTURE ROOT BALL TO REST ON
6"
1'-6"
UNDISTURBED SUBGRADE OR
COMPACTED MOUND
1'-6"
ALso 26 Amelanchier 'Standing Ovation' Standing Ovation Serviceberry 1 1/2" x 2" CAL. B&B, HT. 20', W 15' LIGHTLY HAND TAMP SUBGRADE 2-0"
SR 10 Syringa reticulata 'Ivory Silk' Ivory Silk Tree Lilac 1 1/2" X 2 1/2" CAL. B&B, HT. 20', W 15'
3 x WIDER THAN ROOT BALL
CKst 12 Cornus kousa 'Snow Tower' Kousa Dogwood 1 1/2" x 2 1/2" CAL. B&B, HT. 15', W 8' 6"
MIN.
STD. DECIDUOUS TREET PLANTING
NOT TO SCALE
STD. EVERGREEN PLANTING
NOT TO SCALE
JS 56 Juniperus scopolarum 'Skyrocket' Skyrocket Juniper 6-8' Tall B&B, HT. 16', W 4'
1425 & 1475 Orchard Park Rd
PAcu 40 Picea abies 'Cupressina' Norway Spruce - Columnar 6-8' Tall B&B, HT. 20', W 8'
AC 13 Abies concolor White Fir 6-8' Tall B&B, HT. 60', W 20'
CNp 6 Chamaecyparis nootkatensis 'Pendula' Weeping Nootka Cypress 6-8' Tall B&B, HT. 20', W 8'
PFv 14 Pinus flexilis 'Vanderwolf's' Blue Limber Pine 6-8' Tall B&B, HT. 20', W 8'
CJbd 6 Cryptomeria Japonica 'Black Dragon' Back Dragon Japanese cedar 6-8' Tall B&B, HT. 20', W 8'
© CARMINA WOOD DESIGN
West Seneca, NY
PGd 5 Picea glauca "Densata" Black Hills Spruce 6-8' Tall B&B, HT. 25', W 15'
PMp 9 Pinus mugo 'Pumila' Mugo Pine 24-36'' Tall B&B, HT. 3', W 4'
Juniperus chinensis 'Perfecta' Perfecta Juniper B&B, HT. 16', W 7' ''X''
JCp 29 24-36" Tall
JCog 11 Juniperus chinensis 'Ontario Green' Ontario Green Juniper 24-36" Tall B&B, HT. 8', W 6'
''X'
TYPICAL SPACING ''X''
'
''X'
PRUNE AS SPECIFIED AND AS
'
PR 6 Pinus resinosa Red Pine 6-8' Tall B&B, HT. 60', W 20' NOTED ON DRAWINGS AS DETAILED
ON-CENTER DIMENSION.
RUBBER HOSE ON EACH MAJOR
SPACING VARIES. SEE PLANT LIST. STEM. ALL MAJOR STEMS
Rhus aromatica 'Gro-low' Fragrant Sumac Cont. #3, HT. 2-3, W 6' SHOULD BE WIRED TOGETHER.
RAgl 30 18-24" Tall
PLAN
VC 60 Viburnum carlesii Korean Spice Viburnum 24-36" Tall B&B, HT. 4', W 4' DOUBLE STRAND GUY WIRES 4''W TREE WRAP TO FIRST LIMB
6/17/26
Cornus sericea 'Farrow' Arctic Fire Red Twig Dogwood B&B, HT. 4', W 4' "X" "X" (3). WHITE FLAG ON EACH TO
AFR 36 24-36" Tall
INCREASE VISIBILITY. SET TREE AT ORIGINAL GRADE
Date
PLACE THE CROWN OF THE INSIDE PLANT CONTINUOUS
WRW 33 Ilex verticillata 'Winter Red' Winter Red Winterberry Holly 24-36" Tall B&B, HT. 7', W 5' PLANT LEVEL WITH FINISH SAUCER AT
BED EXPOSED ROOT FLARE KEEP
Blue Rug Juniper GRADE OF PLANTING SOIL. EDGE IN LAWN
JhW 15 Juniperus horizontalis 'Wiltonii' 6-8" Tall B&B, HT.1.5', W 6' CONDITION MULCH 2" FROM TRUNK
MULCH 2"-4" CONDITION
CSd 39 Cornus sericea Red Twig Dogwood 24-36" Tall B&B, HT. 4', W 4' 4" SETTLED DEPTH MULCH. DEPTH FINISH GRADE AT SAUCER
TYPE AS SPECIFIED.
Per Engineering comments
American Eldeberry TOPSOIL
SC 12 Sambucus canadensis 24-36" Tall B&B, HT. 4', W 3'
4"
GENTLY LOOSEN ROOT BALL PRIOR 2'-0'' MIN. LENGTH WOOD
2"
RRr 12 Rosa radrazz Knockout Rose 18-24" Tall Cont. no.3 - 3'Tall, 3'Wide TO PLANTING. IF CIRCLING ROOTS STAKES (3). DRIVE INTO
MAX.
ROOT BALL
6"
DEPTH OF
ARE PRESENT CUT WITH A CLEAN SUBGRADE AS SHOWN.
1'-6"
HQ 15 Hydrangea quercifolia Oakleaf Hydrangea 24-36" Tall B&B, HT. 5', W 5' SHARP BLADE. CUT & LAYBACK TOP 1/3
Nannyberry Viburnum BURLAP FROM ROOT BALL
No. Description
VL 13 Viburnum lentago 36-48" Tall B&B, HT. 5-7', W 6'
PLANTING SOIL MIXTURE NON-BIODEGRADEABLE
SPn 16 Salix purperea 'Nana' Blue Arctic Willow 24-36" Tall B&B, HT. 12', W 6' MATERIAL SHALL BE REMOVED.
6"
SCARIFY SUBSOIL
REVISIONS:
IxMH 11 Ilex x meserveae 'Hachfee' Castle Spire Blue Holly 24-36" Tall B&B, HT. 10', W 4' PLANTING SOIL MIXTURE
Red Twig Dogwood 95% COMPACTED OR ROOT BALL TO REST ON
CSb 12 Cornus sericea baileyi 24-36" Tall B&B, HT. 8', W 8' UNDISTURBED SUBGRADE
1
UNDISTURBED SUBGRADE
Ilex glabra 'Gembox' Gem Box Inkberry Holly 2-3 x WIDER THAN ROOT BALL
IGgb 30 24-36" Tall B&B, HT. 3', W 3'
SPs 0 Salix purperea 'Streamco' Streamco Willow 24-36" Tall B&B, HT. 12', W 6'
SECTION
NOTE: PLANT BULBS IN TRENCHES AND BOUQUET PLANTING
DECIDUOUS TREE PLANTING - MULTI - STEM
GROUND COVER PLANT SPACING NO TO SCALE
NO TO SCALE
RO 29 Andropogon Gerardii 'Red October' Red October Big Blue Stem 18-24" Tall Cont. #3, HT. 4', W 6'
NxF 36 Nepeta x faassenii 'Walker's Low' Walkers Low Catmint 6-12" Tall Cont. no.3 - 18" Tall, 1-4'Wide
FINISH GRADE. PITCH AWAY
OF BUILDING, WALL, FENCE
WHERE APPLICABLE - FACE
FROM STRUCTURE.
PRUNE ONLY BROKEN OR
OR STRUCTURE
DAMAGED BRANCHES
CONTINUOUS SETTLED DEPTH
MULCH BED - 4" DEPTH
45° SPADE CUT EDGE WHERE
BED ABUTS LAWN UNLESS
OTHERWISE NOTED OR
SPECIFIED.
3"
CUT AND LAY BACK TOP 1/3 DRAWING NAME:
BURLAP FROM ROOT-BALL
PLANTING SOIL MIXTURE Landscape Details
UNDISTRUBED SUBGRADE
2'-0" MIN. 2'-0" MIN.
SEE DRWGS. SEE DRWGS.
Date: 5/22/26
Drawn By: A. Pandolfe
STD. SHRUB PLANTING Scale: As Noted
NOT TO SCALE
DRAWING NO.
L-105
Project No: 23-4121
Page 1164 of 1493
Page 1165
UE
EX. PIN CB
UE
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
RIM:683.34
G
APPROX. LOCATION
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
W
682 N. INV:672.94 (18")
ST
Greensboro
S. INV:673.10 (18")
SA
CB
OE
2" RIM:680.53
UE
'-3 N. INV:671.23 (18")
58
EX 5' N .ST
CB
°- 683
G
5.2 32' E OE
0 S. INV:671.23 (18")
.N .
5 10 RIM:685.39
0W.
67 680
AI
N. INV:677.49 (18")
L
87°-09'-45" S. INV:677.49 (16")
684 E. INV:676.99 (4")
UE
SA G
UE
OR
T MH
LO
W
Utica
T. RIM:685.89
BI 685
UE
NW. INV:676.14 (12")
CH
SE. INV:676.22 (12")
UE
W
S
680 S
1 .0
686
PP .
G OE
AR
S
SW
SA
'E
PRO
T
UE
Buffalo
PO W/A F.F.E
EX. REBAR
SED TT . =
4.11' N.
1-S ACH 681
687
D
N
UE
TO ED .60
O
RY G A
TI
5-U RAG
W
X. UE
CA
680
NIT ES
G E
PA
675
LO
O
BU
683
W
113°-18'-53"
ILD
IN
W
G#
O
SA S
PR
2
RK
UE
W
UE
AP
671
T
PROPOSED 1-STORY 4-UNIT BUILDING #3
S
G E
EX. PIN
O
1
W/ATTACHED GARAGES
G#
W
RO
W W W IN
F.F.E. = 681.15
ILD
UE
PP 8' E.SA GSW
W T BU S
672
0.
I E
UN G
PROPOSED 1-STORY 4-UNIT BUILDING #4
UE
-4 RA
RY GA
TO HED 84.80
691
- S
A
1 C 6
ED TA =
OS AT .E.
W/ATTACHED GARAGES
EX 9' N
W OP W/ F.F
OE
UE
PR
D
5.8 /L
S
F.F.E. = 680.40
.R .
T
±O
685
EB
STOP
2
(6
W
AR
UE
67 W
UE
6. 0
Multifamily Development
SA SOE
')
OE 694
UE
UE
W S S PP
G
T
3 OE PP
67 OE
OE 1.0' E.
W
OE EX. IP.
14
11
OE
3.8
5°
S PP 7.27' NW.
NW. COR. LOT 417
-0
6'
UE
4'- SA W
PARKING
1
OE
MS
S
670
69
47
STOP LOT
OE
.
S. LINE LOT 369
"
4
G
692
9
3
69
68
69
0
W
ST
663
688
69
12"
UE
5
EX. IP. 7 EA
5
66
6
69
OE
AR
66
66
.
N. INV: 660.98 (18" HDPE) BIT
12" 170°-37'-13"
OE
89°-57'-36"
668
HYD
2
APPROX. LOCATION
68
CONTRACTOR TO VERIFY LIMITS OF
680
669
WG
OF CEMETERY CEMETERY AND NOTIFY DESIGN
SA S
UE
HEAD STONES NOT ENGINEER OF ANY POTENTIAL CONFLICTS S
LOCATED
T OE
127°-49'-44"
1425 & 1475 Orchard Park Rd
14"
28"
14"
674
UE
EX. IP.
W. INV: 682.97
4
66
(12" HDPE)
ST
23"
UE
COM
12"
© CARMINA WOOD DESIGN
PARKING
S
687
S. INV: 662.31 (18" HDPE)
West Seneca, NY
LOT
75
UE
S S
6
670
686
EX. IP.
5 6 STOP MS
.
683
O/L
66 67 68
2 PART OF &
1
D.
4
146°-28'-21"
68
W. LINE LOT 417
1'
68
UE
L-11442, P-836 9.7
5
68
29
7
67 W
0 W
68
UE
38"
PROPOSED 1-STORY 6 UNIT BUILDING #6
W W
UE
EXCEPTION
COM
30"
PROPOSED 1-STORY 6 UNIT BUILDING #5
8
690
W/ATTACHED GARAGES
149°-26'-50"
67
11" L-3327
W/ATTACHED GARAGES
F.F.E. = 682.80
F.F.E. = 682.80
10 24" EX. IP. P-87
PARKING
Date
666
3. 2.04' NW.
UE
LOT 00
'D
.&
M
S.
SCRUB SHRUB WETLANDS (PSS) 36"
W 33
W
UE
(APPROXIMATE LOCATION) 153°-18'-56" 5 8.
"
0'
69
14"
10
D.
6'-
6
&
9
°-4
7
24"
66
M
67
66
S.
89
8"
UE
W W
675
668
S.
113°-43'-57"
'M
18"
00
No. Description
0 0
3.
70
68
11
UE
S
669
COM
REVISIONS:
5"
T
ND
RA
681
.B
UE
NE
670
EX. REBAR
LI
682
S.
N.
M
EXCEPTION
.&
'D
8" 12" 11"
O/L
L-3036
70
2.
12" 6" 8"
671
12"
26
7" P-217
20" 6"
& 89'
4
3
S.
68
70
6" 12"
D. 72.
M
6" 13"
2 6"
67
0')
EX. IP.
5
68
133°-32'-58"
COM 670
0.
12.33' W.
673 5
69
(7
EX. IP.
3.20' S.
275.56' D. & MS.
AD
674 700 710
87°-23'-54" 705
RO
675 6
20" 68
7
8
68 9
68 695
68
N. INV: 669.78 (18" HDPE)
RG
676
683
1
Lighting Plan
68
BE
SCALE: 1"=50'
DRAWING NAME:
Lighting Plan
Date: 5/22/26
Drawn By: A. Pandolfe
Scale: As Noted
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
50 0 50 100Ft.
LP-100
Project No: 23-4121
50'
Page 1165 of 1493
Page 1166
June 23, 2026
Mr. Jeffrey Schieber
Town of West Seneca
Code Enforcement Officer
1250 Union Road – Room 210
West Seneca, NY 14224
Re: Revised Site Plan Submittal
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Dear Mr. Schieber:
On behalf of our client, Brian Hillery and William Sahlem, please find the enclosed revised civil site
plans and SWPPP Report. These items have been updated based on input received from the Planning
Board at their meeting held on June 11, 2026 and the engineering review comment letter issued on
June 10, 2026.
Below is a summary of updates and revisions based on discussion with the Planning Board:
1. As requested, the Site Plan has been revised to include “No Parking” signs in the greenspace
areas between units.
2. As requested, additional guest parking has been added for the two 6-unit buildings to the
south.
3. A decorative aluminum rail fence has been added around the cemetery.
We offer the following responses to the engineering comment letter issued 6/10/26:
General Comments
1. Please include the 100’ wetland buffer on all project plans.
Response: Due to the recent overturn of the 2025 NYSDEC regulations, DEC no longer has
wetland jurisdiction over this site. Therefore the 100-ft buffer no longer applies.
2. In addition to previously mentioned details, please provide details for the following:
a. All Proposed signage
Response: A ground sign has been added to the site plan C-100. This will be
approved and permitted by the Building Department under a separate application.
b. Curbs (if applicable)
Response: Not Applicable
c. Curb Ramps (if applicable)
Page 1166 of 1493
Page 1167
Response: Not Applicable
d. Bus Shelter
Response: Building plans for the bus shelter, and all other proposed structures, will
be reviewed and approved by the Building Department under a separate application.
e. Emergency Spillway
Response: Detail has been added to Sheet C-303
f. Dumpster enclosure pad
Response: The dumpster pad will be the same as the concrete slab on grade detail
and is noted as such on the site plans.
C-0 Series - Erosion & sediment Control Plans
1. Please indicate the full extent of the limits of disturbance on the ESC plan. Also indicate the
total acreage of proposed disturbance. (This can be shown slightly offset from the true
disturbance to avoid linework conflicts.)
Response: The limits of disturbance and total acreage of disturbance are shown and
noted on Sheet C-001.
2. Please add contour labels to the ESC plan.
Response: Contour labels have been added to Sheet C-001.
3. Please provide a ‘Protective Fencing Detail’ as this is called out for protecting the cemetery.
Has consideration been given to the effects of vibrations caused by heavy machinery (diggers,
vibratory rollers, etc.) to the existing gravestones?
Response: This note has been updated to indicate the fencing to be orange mesh
construction fencing and for the contractor to submit shop drawings prior to
construction. Consideration has been given to the proximity of the cemetery and it is
our opinion that there is a sufficient buffer so as to not disturb the existing gravestones.
4. Please show the location for the construction trailer office/ contractor staging areas on the
ESC plans.
Response: Location of the construction trailer office / contractor staging area has been
added to Sheet C-001.
5. Wherever possible, please adjust silt sock/fence to be installed parallel to contours.
Response: Where possible, the silt sock / fence has been adjusted accordingly.
6. Please include a note on the plan to indicate that stumps and brush may not be buried in the
Town and that topsoil may not be removed from the work site without a permit.
Response: The requested not has been added to Sheet C-001.
Page 1167 of 1493
Page 1168
C-2 Series - Grading Plans
1. Per the site plan checklist, the minimum slope of pavement is to be 1.5%. While the majority
of asphalt grades are close to this, and drainage is not anticipated to be a major concern as
shown, please review grading plans to best attempt to meet this requirement within reason.
Response: The pavement grading, especially on the north section, was largely
constrained due to placement of the buildings and the existing grade. It is our opinion
that the 1.2% minimum slope will be sufficient to provide proper drainage.
2. It is assumed that two separate bioretention areas have been included in order to ensure each
falls under the maximum contributing area threshold of 5-acres. We’d recommend to the
applicant to further vertically separate these two bioretention areas to ensure they act
independently from each other. Furthermore, we’d recommend the applicant review the
potential need for rip-rap stabilization on the larger detention area’s side slopes adjacent to
the bioretention basins to prevent erosion in the case the bioretention basins overflow.
Response: The grading plan has been revised to note a berm is to be installed between
the two bioretention areas to ensure that they acti independently. In the case of
overflow, runoff will be directed to the detention area, which has been noted to be
lined with rip-rap.
C-3 Series - Drainage Plans/ Details
1. Please provide an outlet structure detail for the bioretention areas clearly showing the
elevations of the proposed outlets. Maintain coordination with the HydroCAD model for these
elevations.
Response: An outlet structure detail has been added to Sheet C-303.
C-4 Series - Utility Plans/ Details
1. Please provide utility profiles for all proposed Sanitary Sewers/Laterals and Water service
lines ensuring that all utility crossings are included.
Response: Utility profiles are shown on Sheet C-406.
2. While it is anticipated final locations will be coordinated with and determined by the utility
provider, please provide approximate locations for electrical and gas services.
Response: Approximate locations for electrical and gas services have been added to the
utility plans.
3. Please relocate San MH-1 further to the South such that the new gravity section of sewer is
perpendicular with the existing manhole. The proposed force main and 6” gravity sewer
lateral form the adjacent building can be extended and routed into the manhole. This will
improve the hydraulics of the sewage from the site entering the Town System and eliminates
a potential conflict with existing catch basins.
Response: SAN MH 1 has been relocated as requested.
4. We recommend the applicant utilize fused 3” or 4” HDPE pipe instead of 3” SDR-21 PVC pipes
as it will help eliminate bends and pipe joints which are potential points for leaks.
Page 1168 of 1493
Page 1169
Response: The force main pipe material has been revised from PVC to fused HDPE.
5. We recommend the applicant relocate the sanitary lateral from the Northern apartment
building such that it discharges directly into San MH-2 as opposed to the sewer main in order
to provide improve maintenance access.
Response: The lateral in question has been relocated to connect directly to SAN MH 2.
6. Please provide more information on the size and capacity of the proposed sanitary pumps in
order to ensure the discharge rate is not high enough to inundate the Town’s sewers.
Response: The pump characteristic table on the pump station detail has been filled in on
Sheet C-404.
L-Series - Landscaping Plans/ Details
1. Please review the planting details for trees, evergreens, and shrubs. The Town of West Seneca
states that the ‘crown of the root ball is to be 6” above finished grade for trees and 3” above
finished grade for shrubs’.
Response: The planting details have been updated accordingly.
SWPPP Comments
1. Please add the SBL to Section 102 of the SWPPP document.
Response: SBL No’s. added to Section 102.
2. In Section 110, it is understood that New York State Historic Preservation Office has given
clearance to the project. Has the project engineer or developers reached out to West Seneca
Historical Society or New York State Division of Cemeteries to receive input/comment on the
potential impact to the onsite cemetery? The cemetery, St. Paul’s Union Church of Christ
Cemetery, is registered with the Town of West Seneca and is listed as an active cemetery.
Correspondence with the Church should be had about the nature of how active the cemetery
is, if there are any remaining plots to be filled or plots already purchased for use, and if these
plots have been taken into account in the project design. Please forward all correspondence
to the review engineers.
Response: The onsite cemetery is not listed on the New York State Division of
Cemeteries list as an active cemetery. Conversations with representatives from the
Church indicate that activity levels are low and that there are no remaining plots to be
filed nor plots that have been purchased. The last burial at this cemetery was in 1921.
3. Is more than 5 acres of disturbance at one time proposed? If so, a waiver will need to be
obtained from the Town of West Seneca. Number 23 of the eNOI was answered in the
affirmative, if this is case then please specifically state this in the SWPPP document.
Response: It is expected that more than 5 acres will be disturbed at one time. The need
for a 5 acre waiver has been added to Section 104 – Project Description.
4. Please mention the protective fence for the cemetery in Section 112.3 of the SWPPP.
Page 1169 of 1493
Page 1170
Response: Installation of the temporary protective fencing around the cemetery has
been added to Section 112.3.
5. Please include the number for NYSDEC Spill Response in section 118.3 B3 of the SWPPP.
Response: The NYSDEC Spill Response number has been added to this section.
6. Please provide scaled pre and post drainage area maps for review including all watersheds,
hatches indicating different types of land covers, and a time of concentration line. Please
ensure these are annotated to correspond to the HydroCAD report.
Response: Pre and post construction drainage area maps have been added to the
Engineer’s Report in Appendix D.
7. Please provide pre and post drainage area descriptions within the SWPPP.
Response: Pre and post drainage area descriptions are provided in Section 104 – Project
Description and Section 112.4 – Storm Water Management.
8. Please provide stage-storage table for the proposed bioretention node in the HydroCAD
model.
Response: The bioretention areas have been added to the HydroCAD model.
9. Please ensure all rainfall inputs into the HydroCAD model have been set following Section
4.9 of NYSDEC’s 2024 Stormwater Management Design Manual.
Response: The rainfall inputs have been set accordingly per the NYSSMDM.
10. Many of the HydroCAD nodes have warnings that the peak is exceeding the capacity. Please
review and address or offer an explanation to these warnings.
Response: The warnings refer to the runoff exceeding the capacity of the pipe that is
modeled as part of the time of concentration. This is because the program assumes that
all of the runoff from the subcatchment flows through this pipe, which is not the case.
11. Please include a final link node in the HydroCAD reports to directly compare the total runoff
offsite of the existing and proposed conditions.
Response: A final link has been added to the model accordingly.
12. It is recommended with a site of this size to further break-up watersheds, especially in the
proposed conditions HydroCAD report to improve the accuracy, and better size the proposed
drainage piping.
Response: This is essentially achieved via the pipe sizing calculations provided which
very closely match the HydroCAD model.
13. Please provide stormwater pipe sizing calculations.
Response: Pipe sizing calculations have been added to the Engineer’s Report in
Appendix D.
Page 1170 of 1493
Page 1171
14. Please note, further in-depth review of the SWPPP is needed and may result and further
comments when information requested is provided for review.
Response: Comment acknowledged.
If you should have any questions regarding this letter, please contact me at (716) 213-3750 or via email
at [email protected].
Thank you.
Sincerely,
Carmina Wood Design
Anthony J. Pandolfe, PE | Senior Associate
Page 1171 of 1493
Page 1172
STORMWATER POLLUTION
PREVENTION PLAN
for
CONSTRUCTION ACTIVITIES
At
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, Erie County, New York
Prepared for
Brian Hillery & William Sahlem
1 Woodthrush Trail
Orchard Park, NY 14127
Prepared by
Carmina Wood Design
80 Silo City Row, Suite 100
Buffalo, NY 14203
Telephone: (716) 842-3165
Fax: (716) 842-0263
May 2026
Revised June 2026
Page 1172 of 1493
Page 1173
Table of Contents
Section 101 - Scope
Section 102 - Project Name and Location
Section 103 - Operator’s Name and Address
Section 104 - Project Description
Section 105 - Runoff Coefficient, Soils and Rainfall Information
Section 106 - Name of Receiving Waters
Section 107 - Indian Country Lands
Section 108 - Endangered or Threatened Species
Section 109 - Critical Habitat
Section 110 - Historic Places
Section 111 - Wetlands and/or Other Surface Waters
Section 112 - Erosion and Sediment Controls
Section 112.1 - Stabilization Practices
Section 112.2 - Structural Practices
Section 112.3 - Sequence of Major Activities
Section 112.4 - Storm Water Management
Section 113 - Other Controls
Section 114 - Compliance with Federal, State and Local Regulations
Section 115 - Inspection and Maintenance Procedures
Section 116 - Inspection and Maintenance Report Forms
Section 117 - Other Record-Keeping Requirements
Section 118 - Spill Prevention Control and Countermeasures (SPCC) Plan
Section 118.1 - Materials Covered
Section 118.2 - Material Management Practices
Section 118.3 - Spill Prevention and Response Procedures
Section 119 - Control of Non-Storm Water Discharges
Section 120 – Storm Water Control Facility Maintenance
Multifamily Development
6/17/26
Page 1 of 23
Page 1173 of 1493
Page 1174
Table of Contents (con’t)
Appendix A Site Location Map
Appendix B NYSDEC Notice of Intent (NOI)
Appendix C MS4 SWPPP Acceptance Form
Appendix D Engineer’s Report
Appendix E NYSDEC SPDES General Permit for Stormwater Discharges from Construction Activity Permit No.
GP-0-25-001
Appendix F Forms
• Contractor’s Certification
• Owner/Operator Certification
• SWPPP Preparer Certification
• NYSDEC Letter of Acknowledgment
Appendix G NYSDEC Notice of Termination (NOT)
Appendix H Construction Documents
Appendix I Standard Erosion Control Details
Appendix J Wetland Delineation Figure: by LaBella
Appendix K OPRHP Clearance Letter
Appendix L NYSDEC Stormwater Management Inspection Lists
Multifamily Development
6/17/26
Page 2 of 23
Page 1174 of 1493
Page 1175
101 SCOPE
A. PURPOSE: Brian Hellery & William Sahlem have placed an emphasis on following the New York State
Department of Environmental Conservation (NYSDEC) SPDES General Permit for Stormwater Discharges
from Construction Activity governing storm water discharges during construction, and in accordance with
erosion control practices. The Contractor’s participation in this program is mandatory and its non-
compliance is subject to various remedies, including without limitation, monetary set-offs, withholding
payments; reimbursement for costs, expenses (including reasonable attorney’s fees), fines and civil
penalties incurred by the owner; and/or liquidated damages. This section provides a descriptive
explanation of the owner’s Storm Water Pollution Prevention Program and required Contractor
participation.
The Engineer of record for this project certifies that this SWPPP meets the requirements and is in
compliance with the New York State Stormwater Management Design Manual and latest NYSDEC Phase II
stormwater regulation requirements.
B. SPDES General Permit for Stormwater Discharges from Construction Activity: Regulations promulgated
by the NYSDEC to regulate the discharge of storm water from construction activities on sites where more
than one (1) acre of soil is disturbed. One of the ways to comply with these regulations for affected sites
is to request coverage under the General Permit for Construction Activities for New York State. In order
to use the General Permit, a Notice of Intent (NOI) form must be completed and electronically submitted
to the NYSDEC at least 5 business days prior to any earth-disturbing activities (this time frame may
increase to 60 business days if a full review of the SWPPP is determined necessary by the NYSDEC) and a
Storm Water Pollution Prevention Plan (SWPPP) for the site must be prepared and followed during the
construction activities. Once a copy of the SPDES permit is received from NYSDEC, a copy will be included
in Appendix F of this report.
Approval from a regulated, traditional land use control MS4:
1. An owner or operator of a construction activity that is not subject to the requirements of a
regulated, traditional land use control MS4 must first develop a SWPPP in accordance with all
applicable requirements of this permit and then submit a completed NOI form to the NYSDEC.
2. An owner or operator of a construction activity that is subject to the requirements of a
regulated, traditional land use control MS4 must first develop a SWPPP in accordance with all
applicable requirements of this permit and then have its SWPPP reviewed and accepted by the
MS4 prior to submitting the NOI to the NYSDEC. The owner or operator shall have the “MS4
SWPPP Acceptance” form signed by the principal executive officer or ranking elected official
from the regulated, traditional land use control MS4, or by a duly authorized representative of
that person, and then submit that form along with the NOI to the address referenced under
“Notice of Intent (NOI) Submittal”.
C. RESPONSIBILITIES OF THE CONTRACTOR: The Contractor shall manage the discharge of storm water from
the site in accordance with the NYSDEC General Permit for Construction Activities conditions and the
following provisions of this section. The Operator shall be responsible for conducting the storm water
management practices in accordance with the permit. The Contractor shall be responsible for providing
qualified inspectors to conduct the inspections required by the SWPPP. The Contractor shall be
responsible for any enforcement action taken or imposed by federal, state, or local agencies, including
the cost of fines, construction delays, and remedial actions resulting from the Contractor’s failure to
comply with the permit provisions. It shall be the responsibility of the Contractor to make any changes to
the SWPPP necessary when the Contractor or any of his subcontractors elects to use borrow or fill or
Multifamily Development
6/17/26
Page 3 of 23
Page 1175 of 1493
Page 1176
material storage sites, either contiguous to or remote from the construction site, when such sites are
used solely for this construction site. Such sites are considered to be part of the construction site
covered by the permit and this SWPPP. Off-site borrow, fill, or material storage sites which are used for
multiple construction projects are not subject to this requirement, unless specifically required by state or
local jurisdictional entity regulations. The Contractor should consider this requirement in negotiating with
earthwork subcontractors, since the choice of an off-site borrow, fill, or material storage site may impact
their duty to implement, make changes to, and perform inspections required by the SWPPP for the site.
D. NOTICE OF INTENT: The Operator has petitioned the NYSDEC for coverage under the storm water
discharges during construction at this site to be covered by the SPDES General Permit for Construction
Activity for the State of New York. A Notice of Intent (NOI) for coverage under this permit has been filed
by the Operator. The SWPPP must be prepared prior to submittal of the NOI form. The Operator will
require the Contractor to be a co-permittee with the Operator. The Contractor will be required to post
the NOI at the construction site along with any building permits.
E. CONTRACTOR CERTIFICATION & TRAINING: Proof of Training/Certification of the Contractor’s
designated individual shall be kept on site at all times.
F. REQUIREMENTS FOR THE GENERAL CONTRACTOR AND SUBCONTRACTOR(S): The General Contractor
and Subcontractor(s) shall sign the “Contractor’s Certification Statement” (located in the Appendix of this
report) verifying they have been instructed on how to comply with and fully understand the requirements
of the SPDES General Permit for Construction Activity for the State of New York and the SWPPP. These
certifications must be signed, by a responsible corporate officer or other party meeting the “Signatory
Requirements” of the SPDES General Permit, on behalf of each entity, prior to the beginning of any
construction activities.
G. STORM WATER POLLUTION PREVENTION PROGRAM LOCATION REQUIREMENTS: The SWPPP is meant to
be a working document that shall be maintained at the site of the Construction Activities at all times
throughout the project, shall be readily available upon request by the Operator’s personnel or NYSDEC or
any other agency with regulatory authority over storm water issues, and shall be kept on-site until the
site complies with the Final Stabilization section of this document. A sign or other notice must be posted
near the main entrance of the construction site which contains a completed NOI, the location of the
SWPPP and the name and phone number of a contact person responsible for scheduling SWPPP viewing
times, and any other state specific requirements.
H. INSPECTIONS AND RECORD-KEEPING:
A. General Construction Site Inspection and Maintenance Requirements
1. The owner or operator must ensure that all erosion and sediment control practices and
all post-construction stormwater management practices identified in the SWPPP are
maintained in effective operating condition at all times.
2. The terms of this permit shall not be construed to prohibit the State of New York from
exercising any authority pursuant to the ECL, common law or federal law, or prohibit
New York State from taking any measures, whether civil or criminal, to prevent
violations of the laws of the State of New York, or protect the public health and safety
and/or the environment.
B. Owner or operator Maintenance Inspection Requirements
1. The owner or operator shall inspect, in accordance with the requirements in the most
current version of the technical standard, New York State Standards and Specifications
Multifamily Development
6/17/26
Page 4 of 23
Page 1176 of 1493
Page 1177
for Erosion and Sediment Control, the erosion and sediment controls identified in the
SWPPP to ensure that they are being maintained in effective operating condition at all
times.
2. For construction sites where soil disturbance activities have been temporarily suspended
(e.g. winter shutdown) and temporary stabilization measures have been applied to all
disturbed areas, the owner or operator can stop conducting the maintenance
inspections. The owner or operator shall begin conducting the maintenance inspections
in accordance with Part IV.B.1. of the General Permit as soon as soil disturbance
activities resume.
3. For construction sites where soil disturbance activities have been shut down with partial
project completion, the owner or operator can stop conducting the maintenance
inspections if all areas disturbed as of the project shutdown date have achieved final
stabilization and all post-construction stormwater management practices required for
the completed portion of the project have been constructed in conformance with the
SWPPP and are operational.
C. Qualified inspector Inspection Requirements
The owner or operator shall have a qualified inspector conduct site inspections in conformance
with the following requirements:
Note: The trained contractor identified in Part III.A.6 of the General Permit cannot conduct the
qualified inspector site inspections unless they meet the qualified inspector qualifications
included in Appendix A of the General Permit. In order to perform these inspections, the trained
contractor would have to be a:
• Licensed Professional Engineer,
• Certified Professional in Erosion and Sediment Control (CPESC),
• Registered Landscape Architect, or
• Someone working under the direct supervision of, and at the same company as, the
licensed Professional Engineer or Registered Landscape Architect, provided they have
received four (4) hours of Department endorsed training in proper erosion and sediment
control principles from a Soil and Water Conservation District, or other Department
endorsed entity.
1. A qualified inspector shall conduct site inspections for all construction activities identified in
Tables 1 and 2 of Appendix B of the General Permit, with the exception of:
a. The construction of a single family residential subdivision with 25% or less impervious
cover at total site build-out that involves a soil disturbance of one (1) or more acres of
land but less than five (5) acres and is not located in one of the watersheds listed in
Appendix C of the General Permit and not directly discharging to one of the 303(d)
segments listed in Appendix E of the General Permit;
b. The construction of a single family home that involves a soil disturbance of one (1) or
more acres of land but less than five (5) acres and is not located in one of the
watersheds listed in Appendix C and not directly discharging to one of the 303(d)
segments listed in Appendix E of the General Permit;
Multifamily Development
6/17/26
Page 5 of 23
Page 1177 of 1493
Page 1178
c. Construction on agricultural property that involves a soil disturbance of one (1) or more
acres of land but less than five (5) acres; and
d. Construction activities located in the watersheds identified in Appendix D of the
General Permit that involve soil disturbances between five thousand (5000) square feet
and one (1) acre of land.
2. Unless otherwise notified by the Department, the qualified inspector shall conduct site
inspections in accordance with the following timetable:
a. For construction sites where soil disturbance activities are on-going, the qualified
inspector shall conduct a site inspection at least once every seven (7) calendar days.
b. For construction sites where soil disturbance activities are on-going and the owner or
operator has received authorization in accordance with Part II.C.3 of the General
Permit to disturb greater than five (5) acres of soil at any one time, the qualified
inspector shall conduct at least two (2) site inspections every seven (7) calendar days.
The two (2) inspections shall be separated by a minimum of two (2) full calendar days.
c. For construction sites where soil disturbance activities have been temporarily
suspended (e.g. winter shutdown) and temporary stabilization measures have been
applied to all disturbed areas, the qualified inspector shall conduct a site inspection
at least once every thirty (30) calendar days. The owner or operator shall notify the
Regional Office stormwater contact person (see contact information in Appendix F of
the General Permit) or, in areas under the jurisdiction of a regulated, traditional land
use control MS4, the MS4 (provided the MS4 is not the owner or operator of the
construction activity) in writing prior to reducing the frequency of inspections.
d. For construction sites where soil disturbance activities have been shut down with
partial project completion, the qualified inspector can stop conducting inspections if
all areas disturbed as of the project shutdown date have achieved final stabilization and
all post-construction stormwater management practices required for the completed
portion of the project have been constructed in conformance with the SWPPP and are
operational. The owner or operator shall notify the Regional Office stormwater contact
person or, in areas under the jurisdiction of a regulated, traditional land use control
MS4, the MS4 (provided the MS4 is not the owner or operator of the construction
activity). in writing prior to the shutdown. If soil disturbance activities are not resumed
within 2 years from the date of shutdown, the owner or operator shall have the
qualified inspector perform a final inspection and certify that all disturbed areas have
achieved final stabilization, and all temporary, structural erosion and sediment control
measures have been removed; and that all post-construction stormwater management
practices have been constructed in conformance with the SWPPP by signing the “Final
Stabilization” and “Post-Construction Stormwater Management Practice” certification
statements on the NOT. The owner or operator shall then submit the completed NOT
form to the address in Part II.A.1 of the General Permit.
3. At a minimum, the qualified inspector shall inspect all erosion and sediment control practices to
ensure integrity and effectiveness, all post-construction stormwater management practices
under construction to ensure that they are constructed in conformance with the SWPPP, all areas
of disturbance that have not achieved final stabilization, all points of discharge to natural
surface waterbodies located within, or immediately adjacent to, the property boundaries of the
construction site, and all points of discharge from the construction site.
Multifamily Development
6/17/26
Page 6 of 23
Page 1178 of 1493
Page 1179
4. The qualified inspector shall prepare an inspection report subsequent to each and every
inspection. At a minimum, the inspection report shall include and/or address the following:
a. Date and time of inspection;
b. Name and title of person(s) performing inspection;
c. A description of the weather and soil conditions (e.g. dry, wet, saturated) at the time of
the inspection;
d. A description of the condition of the runoff at all points of discharge from the
construction site. This shall include identification of any discharges of sediment from
the construction site. Include discharges from conveyance systems (i.e. pipes, culverts,
ditches, etc.) and overland flow;
e. A description of the condition of all natural surface waterbodies located within, or
immediately adjacent to, the property boundaries of the construction site which receive
runoff from disturbed areas. This shall include identification of any discharges of
sediment to the surface waterbody;
f. Identification of all erosion and sediment control practices that need repair or
maintenance;
g. Identification of all erosion and sediment control practices that were not installed
properly or are not functioning as designed and need to be reinstalled or replaced;
h. Description and sketch of areas that are disturbed at the time of the inspection and
areas that have been stabilized (temporary and/or final) since the last inspection;
i. Current phase of construction of all post-construction stormwater management
practices and identification of all construction that is not in conformance with the
SWPPP and technical standards;
j. Corrective action(s) that must be taken to install, repair, replace or maintain erosion
and sediment control practices; and to correct deficiencies identified with the
construction of the post-construction stormwater management practice(s); and
k. Digital photographs, with date stamp, that clearly show the condition of all practices
that have been identified as needing corrective actions. The qualified inspector shall
attach paper color copies of the digital photographs to the inspection report being
maintained onsite within seven (7) calendar days of the date of the inspection. The
qualified inspector shall also take digital photographs, with date stamp, that clearly
show the condition of the practice(s) after the corrective action has been completed.
The qualified inspector shall attach paper color copies of the digital photographs to the
inspection report that documents the completion of the corrective action work within
seven (7) calendar days of that inspection.
5. Within one business day of the completion of an inspection, the qualified inspector shall notify
the owner or operator and appropriate contractor or subcontractor identified in Part III.A.6. of
any corrective actions that need to be taken. The contractor or subcontractor shall begin
implementing the corrective actions within one business day of this notification and shall
complete the corrective actions in a reasonable time frame.
Multifamily Development
6/17/26
Page 7 of 23
Page 1179 of 1493
Page 1180
6. All inspection reports shall be signed by the qualified inspector. Pursuant to Part II.C.2 of the
General Permit, the inspection reports shall be maintained on site with the SWPPP.
Record Retention - The owner or operator shall retain a copy of the NOI, NOI Acknowledgment Letter,
SWPPP, MS4 SWPPP Acceptance form and any inspection reports that were prepared in conjunction with
this permit for a period of at least five (5) years from the date that the site achieves final stabilization.
This period may be extended by the Department, in its sole discretion, at any time upon written
notification.
I. SWPPP MODIFICATIONS: The inspection report should also identify if any revisions to the SWPPP are
warranted due to unexpected conditions. The SWPPP is meant to be a dynamic working guide that is to
be kept current and amended whenever there is a change in design, construction, operation, or
maintenance at the construction site that has or could have a significant effect on the discharge of
pollutants or when the plan proves to be ineffective in eliminating or significantly minimizing pollutant
discharges. The Contractor’s failure to modify or report deficiencies to the Operator will result in the
Contractor being liable for fines and construction delays resulting from any federal, state, or local agency
enforcement action.
J. FINAL STABILIZATION AND TERMINATION OF PERMIT COVERAGE: A site can be considered finally
stabilized when all soil disturbing activities have been completed and a uniform perennial vegetative
cover with a density of 85% for the unpaved areas and areas not covered by permanent structures has
been established or equivalent permanent stabilization measures have been established and the facility
no longer discharges storm water associated with construction activities and a Notice of Termination
(NOT) form filed by the Operator(s) with the NYSDEC. The Operator’s Project Manager must complete the
NOT. The NOT must be signed by the signatory (or equivalent position) on the NOI and subsequently
submitted to the appropriate agency. The Operator’s Project Manager must provide a completed copy of
the NOT to the Contractor for inclusion in the SWPPP, which will then be optically scanned into the final
SWPPP document as required. This filing terminates coverage under the General Permit and terminates
the Contractor’s responsibility to implement the SWPPP, but the requirements of the SWPPP, including
periodic inspections, must be continued until the NOT is filed. The owner or operator shall also have the
qualified inspector perform a final site inspection prior to submitting the NOT to the Department. Final
payment and/or the release of retainage will be withheld until all provisions of the SWPPP have been
submitted, completed and accepted by the Operator.
102 PROJECT NAME AND LOCATION
Multifamily Development
1425 & 1475 Orchard Park Road (SBL Nos. 143.19-1-8, 143.19-1-9 & 152.07-1-1)
Town of West Seneca, County of Erie, New York
Easting: 192275
Northing: 4746778
Estimated Area of Site ≈ 16.59 acres
Estimated Area to be disturbed by Construction Activities ≈ 7.37 acres
A general location map is included as Appendix A.
103 OPERATOR’S NAME AND ADDRESS
Brian Hillery & William Sahlem
Multifamily Development
6/17/26
Page 8 of 23
Page 1180 of 1493
Page 1181
1 Woodthrush Trail
Orchard Park, NY 14127
Contact Person: Brian Hillery
Telephone: 716-512-3425
104 PROJECT DESCRIPTION
This new development project involves the construction of three (3) 4-unit, one (1) 5-unit and two (2) 6-
unit ranch style townhomes, for a total of 29 units. Construction will also consist of associated parking,
storm water management, utility, lighting, and landscaping improvements. The site is currently vacant
consisting of grass, brush and tree cover. The total area of the site is 16.59 acres with an area of
disturbance of approximately 7.37 acres. The site has been rezoned to C-1(S) to allow for the
development. Since more than five (5) acres will be disturbed at one time, a waiver will be obtained from
the Town of West Seneca and inspections shall be performed twice per week.
Soil disturbing activities will include:
A. Construction of temporary construction exit points
B. Clearing & grubbing of the site within disturbance limits
C. Installation of the detention basin & bioretention areas including topsoil & seed
D. Installation of storm sewer pipes and inlets
E. Construction of utilities
F. Construction of curb and parking lot
G. Final grading & landscaping
H. Construction of buildings
This project is owned by Brian Hillery and William Sahlem and will be developed by the same. The work
area consists of approximately 7.37 acres for which erosion and sediment controls have been developed
and fully addressed in this written plan and the Erosion and Sediment Control Plans. See the construction
documents for additional details.
105 RUNOFF COEFFICIENT, SOILS, AND RAINFALL INFORMATION
The initial runoff curve number for the pre-construction site is "CN" = 80. The post-construction runoff
curve number for the site will be "CN" = 88. The site is 7.37 acres of which approximately 7.37 acres will
be disturbed by construction activities.
The site is in Erie County, which receives an average of approximately 45 inches rainfall annually with the
highest amounts of rainfall received in the months of May through September. Annual snow for this area
is approximately 120 inches.
106 WATERS
The runoff generated from this site will discharge to existing wetlands on the west side of the project
site. Runoff is eventually discharged to Smoke Creek.
Multifamily Development
6/17/26
Page 9 of 23
Page 1181 of 1493
Page 1182
107 INDIAN COUNTRY LANDS
This project is not located on Indian Lands.
108 ENDANGERED AND THREATENED SPECIES
No endangered or threatened species have been determined to be on the site.
109 CRITICAL HABITAT
See section 108 above.
110 HISTORIC PLACES
The assessed property is shown on the NYSHPO map as an archeologically sensitive area. A Phase I
Cultural Resource Investigation Report was prepared for the site.
Refer to Appendix K for OPRHP Clearance Letter
111 WETLANDS AND/OR OTHER SURFACE WATERS
Approximately 5.60 acres of USACE wetlands were delineated on site. The proposed development will not
encroach on nor disturb the wetlands.
Refer to Appendix J for Wetland Delineation Figure: by LaBella
112 EROSION AND SEDIMENT CONTROLS
112.1 STABILIZATION PRACTICES
Stabilization practices for this site include:
A. Land clearing activities shall be done only in areas where earthwork will be performed and shall
progress as earthwork is needed.
B. Use of stabilization method for all slopes having a slope greater than 1V:3H.
C. Permanent seeding and planting of all unpaved areas using the hydromulching grass seeding
technique.
D. Mulching exposed areas.
E. Vegetation preservation in undisturbed areas.
F. Frequent watering to minimize wind erosion during construction.
a. For sites where 5 acres or more are disturbed at any one time: In areas where soil
disturbance activity has been temporarily or permanently ceased, temporary and/or
permanent soil stabilization measures shall be installed and/or implemented within
seven (7) days from the date the soil disturbance activity ceased. The soil stabilization
measures selected shall be in conformance with the most current version of the New
York Standards and Specifications for Erosion and Sediment Control.
b. The owner or operator shall prepare a phasing plan that defines maximum disturbed
area per phase and shows required cuts and fills.
Multifamily Development
6/17/26
Page 10 of 23
Page 1182 of 1493
Page 1183
c. The owner or operator shall install any additional measures needed to protect water
quality.
112.2 STRUCTURAL PRACTICES
Structural practices for this site include:
A. Inlet protection using a method detailed in the Construction Documents.
B. Perimeter protection using temporary silt fence/silt sock or silt sock.
C. Outlet protection using rip-rap stone and end sections.
D. Stabilized Construction Entrance.
E. Temporary stone wash off areas.
F. Storm sewer, curb/gutter.
G. Sediment traps and basins.
112.3 SEQUENCE OF MAJOR ACTIVITIES
The Contractor will be responsible for implementing the following erosion control and storm water
management control measures. The Contractor may designate these tasks to certain subcontractors as he
sees fit, but the ultimate responsibility for implementing these controls and ensuring their proper
functioning remains with the Contractor. The order of activities will be as follows:
A. Construct temporary construction exit at location shown on the Demo & Erosion Control Plan Sheet.
B. Install perimeter silt fences in the locations shown on the Demo & Erosion Control Plan Sheet.
C. Install protective fencing around cemetery as noted on the Demo & Erosion Control Plan Sheet.
D. Clear and grub site within disturbance (silt fence) limits.
E. Installation of detention basin to act as sediment basin (do not install bioretention soil or underdrains
until stabilized)
F. Commence site grading.
G. Disturbed areas of the site where construction activity has ceased for more than 14 days shall be
temporarily seeded and watered.
H. Construction of buildings.
I. Installation of proposed utilities.
J. Finalize pavement subgrade preparation.
K. Construct all curb, drainage inlets, storm sewer pipes and storm sewer manholes, as shown on the
plans. Install temporary inlet protection at the locations of all new inlets.
L. Dust control.
M. Remove inlet protection around inlets and manholes no more than 48 hours prior to placing stabilized
base course.
Multifamily Development
6/17/26
Page 11 of 23
Page 1183 of 1493
Page 1184
N. Install base material as required for pavement.
O. Carry out final grading and seeding and planting.
P. Clean storm system following construction.
Q. Remove silt fencing only after all paving is complete and exposed surfaces are stabilized.
Note: Sediment control storage during construction (traps & basins) during construction shall be 134 cy
per acre of disturbance per NYSDEC requirements.
112.4 STORM WATER MANAGEMENT
The existing site sheet drains from east to west to a USACE jurisdictional wetland area at the rear of the
site.
The proposed development will replicate the existing hydrology of the site. The proposed hydrology for
the development project area will consist of overland sheet flow and pipe channel flow. The storm sewer
system for this site will consist of 6”, 8” and 12” HDPE pipes connected by a series of catch basins and
yard drains. Stormwater runoff generated from the site will enter the pipe network and be conveyed to a
detention basin on the west side of the site. The detention basin will discharge runoff, at a controlled
rate, to the existing wetlands. To meet NYSDEC water quality requirements, runoff will be conveyed to a
bioretention areas prior to the detention basin. Runoff that is currently being discharged on to the site
from the church parking lot to the east will be collected and piped to the west side of the site.
The NYSDEC Stormwater Management Design Manual requires a five-step process for Stormwater
Management Planning as outlined in Chapter 3. The five steps include:
1. Site planning to preserve natural features and reduce impervious cover.
• Approximately 5.6 acres of existing vegetation within the existing wetlands will remain
and be protected.
2. Calculation of Water Quality Volume (WQv=RRv) for site.
• See Stormwater Drainage Calculations.
3. Incorporation of Green Infrastructure techniques and standard SMPs with Runoff Reduction
Volume (RRv) capacity.
• Bioretention areas were incorporated into the site design to provide required RRv for
the development. See Stormwater Drainage Calculations.
4. Use of standard SMPs where applicable, to treat the portion of water quality volume not
addressed by green infrastructure techniques and standard SMPs with RRv capacity.
• The bioretention areas serve to the treat the remaining WQv.
5. Design of volume and peak rate control practices where required.
• See Stormwater Drainage Calculations.
The NYSDEC Stormwater Management Design Manual requires (5) five different criteria be considered
when designing a stormwater management system. Those criteria are Water Quality, Runoff
Reduction Volume, Channel Protection, Overbank Flooding and Extreme Storm Protection. Below is a
summary of each item and how it is incorporated into this project.
Multifamily Development
6/17/26
Page 12 of 23
Page 1184 of 1493
Page 1185
Water Quality & Runoff Reduction Volume:
The NYSDEC requires reduction of the total water quality volume by green infrastructure techniques and
SMP’s to replicate pre-development hydrology. Bioretention areas were incorporated into the site layout
to provide the required RRv for contributing WQv runoff area for the development. The bioretention
areas will provide 4,378 cf RRv. The minimum RRv required is 2,047 cf. The bioretention areas will also
treat 6,349 cf of WQv. The required WQv = 10,727 cf. The sum of the WQv treated and the RRv is equal
to the required WQv, therefore the practice is acceptable.
Channel Protection:
The NYSDEC requires that 24-Hour extended detention be provided for the proposed 1-year storm event.
A volume of 5,335 cf is accommodated in the detention basin at elevation 671.04.
Overbank Flooding:
The NYSDEC requires that the 10-year proposed storm event be attenuated with detention and that the
outlet be restricted to the 10-year existing storm event. A volume of 15,013 cf is accommodated in the
detention basin at elevation 672.95.
Extreme Storm Protection:
The NYSDEC requires that the 100-year proposed storm event be attenuated with detention and that the
outlet be restricted to the 100-year existing storm event. A volume of 34,966 cf is accommodated in the
detention basin at elevation 674.73.
Refer to the engineer’s report for storm sewer design criteria, runoff summary tables and stormwater
drainage calculations.
113 OTHER CONTROLS
113.1 OFF-SITE VEHICLE TRACKING
A stabilized construction exit will be provided to help reduce vehicle tracking of sediments. Existing
paved areas will remain as long as possible and will be used for vehicle wash areas and to further aid in
the reduction of vehicle tracking of sediments. The paved streets adjacent to the site entrance shall be
inspected daily and swept as necessary to remove any excess mud, dirt, or rock tracked from the site.
Dump trucks hauling material to/from the construction site will be covered with a tarpaulin. The job site
superintendent will be responsible for seeing that these procedures are followed.
113.2 EXCAVATION SPOIL MATERIALS
Excavation spoil materials are generated during the excavation of the development’s building and utilities
installation. These materials must be properly managed to prevent them from contributing to storm
water discharges. The materials generated from the development of this project will be hauled off-site
or stockpiled for re-use in designated areas which will have temporary erosion & sediment control
measures installed. Any removal from site will be done under the necessary permits required by the local
governing agencies.
113.3 DUST CONTROL
Multifamily Development
6/17/26
Page 13 of 23
Page 1185 of 1493
Page 1186
Minimizing wind erosion and controlling dust will be accomplished by one or more of the following
methods:
A. Frequent watering of excavation and fill areas.
B. Providing gravel or paving at entrance/exit drives, parking areas and transit paths.
113.4 WASTE DISPOSAL
If needed, all waste materials will be collected and stored in securely lidded metal dumpsters rented
from an approved waste management company. The dumpster will comply with all local and state solid
waste management regulations.
All trash and construction debris from the site will be deposited in the dumpsters. The dumpsters will be
emptied when full and then hauled to a NYSDEC approved landfill for proper disposal. No construction
waste will be buried on-site. All personnel will be instructed regarding the correct procedures for waste
disposal.
113.5 SANITARY WASTE
If needed, portable toilet units or field offices with toilet facilities connected to the municipal sanitary
sewer will be used for sanitary purposes. All portable toilet units will be emptied a minimum of once per
week by a licensed portable facility provided in compliance with local and state regulations.
113.6 CONCRETE WASTE FROM CONCRETE TRUCKS
A. Emptying of excess unhardened concrete and/or washout from concrete delivery trucks will be
allowed on the job site, but in either (1) specifically designated diked areas which have been
prepared to prevent contact between concrete and/or washout and storm water which will be
discharged from the site or (2) in locations where waste concrete will be poured into forms to
make rip-rap or other useful concrete products.
B. Hardened waste concrete from the designated diked areas described above will be disposed of in
accordance with applicable local and state regulations with regards to disposal of construction
debris.
113.7 HAZARDOUS SUBSTANCES & HAZARDOUS WASTE
A. All hazardous waste materials will be disposed of by the Contractor in the manner specified by
local, state, and/or federal regulations and by the manufacturer of such products. Site
personnel will be instructed in these practices by the job superintendent, who will also be
responsible for seeing these practices are followed. Material Safety Data Sheets (MSDS’s) for
each substance with hazardous properties that is used on the job site will be obtained and used
for the proper management of potential wastes that may result from these products. An MSDS
will be posted in the immediate area where such products are stored and/or used and another
copy of each MSDS will be maintained in the SWPPP file at the job site construction office. Each
employee who must handle a substance with hazardous properties will be instructed on the use
of MSDS sheets and the specific information in the applicable MSDS for the product he/she is
using, particularly regarding spill control techniques.
B. The contractor will implement the Spill Prevention Control and Countermeasures (SPCC) Plan
found within this SWPPP and will train all personnel in the proper cleanup and handling of spilled
materials. No spilled hazardous materials of hazardous wastes will be allowed to come in
contact with storm water discharges. If such contact occurs, the storm water discharge shall be
Multifamily Development
6/17/26
Page 14 of 23
Page 1186 of 1493
Page 1187
contained on site until appropriate measures in compliance with state and federal regulations
are taken to dispose of such contaminated storm water. It shall be the responsibility of the job
superintendent to properly train all personnel in the use of the SPCC plan.
C. Any spills of hazardous materials which are in excess of the Reportable Quantities as defined by
the EPA regulations shall be immediately reported to the EPA National Response Center at 1-100-
424-1102. From SWPPP-9 “Reportable Quantity Release Form” must be filled out.
D. In order to minimize the potential for a spill of hazardous materials to come in contact with
storm water, the following steps will be implemented:
1. All materials with hazardous properties (such as pesticides, petroleum products,
fertilizers, detergents, construction chemicals, acids, paints, paint solvents, cleaning
solvents, additives for soil stabilization, concrete curing compounds and additives, etc.)
will be stored in a secure location, under cover, when not in use.
2. The minimum practical quantity of all such materials will be kept on the job site.
3. A spill control and containment kit (containing for example, absorbent such as kitty
litter or sawdust, acid neutralizing powder, brooms, dust pans, mops, rags, gloves,
goggles, plastic and metal trash containers, etc.) will be provided at the storage site.
4. All of the product in a container will be used before the container is disposed of. All
such containers will be triple rinsed with water prior to disposal. The rinse water used
in these containers will be disposed of in a manner in compliance with state and federal
regulations and will not be allowed to mix with storm water discharges.
5. All products will be stored in and used from the original container with the original
product label.
6. All products will be used in strict compliance with instructions on the product label.
7. The disposal of excess or used products will be in strict compliance with instructions on
the product label.
113.8 CONTAMINATED SOILS
A. Any contaminated soils (resulting from spills of materials with hazardous properties) which may
result from construction activities will be contained and cleaned up immediately in accordance
with the procedures given in the Spill Prevention Control and Countermeasures (SPCC) Plan and
in accordance with applicable state and federal regulations.
B. The job site superintendent will be responsible for seeing that these procedures are followed.
114 COMPLIANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS
The Contractor will obtain copies of any and all local and state regulations which are applicable to storm
water management, erosion control, and pollution minimization at this job site and will comply fully with
such regulations. The Contractor will submit written evidence of such compliance if requested by the
Operator or any agent of a regulatory body. The Contractor will comply with all conditions of the SPDES
General Permit for Construction Activity for the State of New York, including the conditions related to
maintaining the SWPPP and evidence of compliance with the SWPPP at the job site and allowing
regulatory personnel access to the job site and to records in order to determine compliance.
Multifamily Development
6/17/26
Page 15 of 23
Page 1187 of 1493
Page 1188
The SWPPP for this site development project requires regulated MS4 approval from the Town of West
Seneca. All changes to the SWPPP must be approved by the Town of West Seneca prior to applying
changes to the SWPPP in the field.
115 INSPECTION AND MAINTENANCE PROCEDURES
The following inspection and maintenance practices will be used to maintain erosion and sediment
controls and stabilization measures.
1. All control measures will be inspected by the owner/operator at least weekly and shall continue
until the site complies with the Final Stabilization section of this document (See Section 116).
2. All control measures will be inspected by a Qualified Professional at least weekly and shall
continue until the site complies with the Final Stabilization section of this document (See Section
116).
3. All measures will be maintained in good working order; if repairs or other measures are found to
be necessary, they will be initiated within 24 hours of report.
4. Built up sediment will be removed from silt fence/silt sock when it has reached one-third the
height of the fence.
5. Silt fence/silt socks will be inspected for depth of sediment, tears, etc., to see if the fabric is
securely attached to the fence posts, and to see that the fence posts are securely in the ground.
6. Temporary and permanent seeding and all other stabilization measures will be inspected for bare
spots, washouts, and healthy growth.
7. A maintenance inspection report will be made after each inspection. Copies of the report forms
to be completed by the inspector are included in this SWPPP.
8. The job site superintendent will be responsible for selecting and training the individuals who will
be responsible for these inspections, maintenance and repair activities, and filling out inspection
and maintenance reports.
9. Personnel selected for the inspection and maintenance responsibilities will receive training from
the job site superintendent. They will be trained in all the inspection and maintenance practices
necessary for keeping the erosion and sediment controls that are used onsite in good working
order. They will also be trained in the completion of, initiation of actions required by, and the
filing of the inspection forms. Documentation of this personnel training will be kept on site with
the SWPPP.
10. Disturbed areas and materials storage areas will be inspected for evidence of or potential for
pollutants entering stormwater systems.
11. Report to the NYSDEC within 24 hours any noncompliance with the SWPPP that will endanger
public health or the environment. Follow up with a written report within 5 days of the
noncompliance event. The following events require 24 hour reporting: a) any unanticipated
bypass which exceeds any effluent limitation in the permit, b) any upset which exceeds any
effluent limitation in the permit, and c) a violation of a maximum daily discharge limitation for
any of the pollutants listed by the NYSDEC in the permit to be reported within 24 hours. The
written submission must contain a description of the non-compliance and its cause; the period of
non-compliance, including exact dates and times, and if the non-compliance has not been
Multifamily Development
6/17/26
Page 16 of 23
Page 1188 of 1493
Page 1189
corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce,
eliminate, and prevent recurrence of the non-compliance.
12. Releases of hazardous substances or oil in excess of reportable quantities (as established under
40 CFR 110, 40 CFR 117 or 40 CFR 302) must be reported.
Upon completion of construction, the property owner is responsible for ensuring that the stormwater
facilities are regularly inspected and maintained. Maintenance and inspection procedures are as follows.
1. On a quarterly basis and following significant rainfall events or snow-melts, perform the
following:
• Inspect catch basins, storm manholes, treatment structures, storm piping and
stormwater pond for debris and accumulation of sediment.
• Remove and properly dispose of any collected debris and sediment in accordance with
applicable state, federal and local regulations.
• Flush piping with water if necessary to remove accumulated sediment.
• Bioretention areas shall be maintained per the NYSDEC Maintenance and Management
Checklist included in this SWPPP.
• Check all stone outfall structures for erosion and re-stone if necessary to prevent
further erosion.
• Inspect grassed/landscaped areas for un-vegetated areas or areas with less than 85%
healthy stand of grass and reseed and mulch as necessary. Water daily if reseeded in
July and August.
• A record of all inspections should be kept.
2. Maintain all lawn areas by regular mowing, including the grassed slopes of the stormwater pond
and any grass swales. Any eroded areas shall be regarded, seeded and mulched immediately.
116 INSPECTION AND MAINTENANCE REPORT FORMS
Once installation of any required or optional erosion control device or measure has been implemented,
inspections shall be performed by a Qualified Professional at least once every seven (7) calendar days.
For construction sites where soil disturbance activities are on-going and the owner or operator has
received authorization in accordance with Part II.C.3 of the General Permit to disturb greater than five
(5) acres of soil at any one time, the qualified inspector shall conduct at least two (2) site inspections
every seven (7) calendar days. The two (2) inspections shall be separated by a minimum of two (2) full
calendar days. The owner and contractor shall obtain from the MS4 an approval for disturbing more than
five-acres at any given time. For construction sites where active construction has been suspended,
inspection frequency under the general permit can be reduced to once every 30 days, provided temporary
stabilization measures have been applied to all disturbed areas. The forms found in this SWPPP shall be
used by the inspectors to inventory and report the condition of each measure to assist in maintaining the
erosion and sediment control measures in good working order.
These report forms shall become an integral part of the SWPPP and shall be made readily accessible to
governmental inspection officials, the Operator’s Engineer, and the Operator for review upon request
during visits to the project site. In addition, copies of the reports shall be provided to any of these
Multifamily Development
6/17/26
Page 17 of 23
Page 1189 of 1493
Page 1190
persons, upon request, via mail or facsimile transmission. Inspection and maintenance report forms are to
be maintained by the permittee for five years following the final stabilization of the site.
117 OTHER RECORD-KEEPING REQUIREMENTS
The Contractor shall keep the following records related to construction activities at the site:
• Dates when major grading activities occur and the areas which were graded
• Dates and details concerning the installation of structural controls
• Dates when construction activities cease in an area
• Dates when an areas is stabilized, either temporarily or permanently
• Dates of rainfall and the amount of rainfall
• Dates and descriptions of the character and amount of any spills of hazardous materials
• Records of reports filed with regulatory agencies if reportable quantities of hazardous materials
spilled
118 SPILL PREVENTION CONTROL AND COUNTERMEASURES (SPCC) PLAN
118.1 MATERIALS COVERED
The following materials or substances are expected to be present onsite during construction:
• Concrete/Additives/Wastes
• Cleaning solvents
• Sanitary wastes
• Detergents
• Petroleum based products
• Paints/Solvents
• Pesticides
• Solid and construction wastes
• Acids
• Fertilizers
• Soil stabilization additives
118.2 MATERIAL MANAGEMENT PRACTICES
The following are the material management practices that will be used to reduce the risk of spills or
other accidental exposure of materials and substances to stormwater runoff. The job site superintendent
will be responsible for ensuring that these procedures are followed.
A. Good Housekeeping
The following good housekeeping practices will be followed onsite during the construction
project.
1. An effort will be made to store only enough products required to do the job.
2. All materials stored onsite will be stored in a neat, orderly manner and, if possible,
under a roof or in a containment area. At a minimum, all containers will be stored with
their lids on when not in use. Drip pans shall be provided under all dispensers.
Multifamily Development
6/17/26
Page 18 of 23
Page 1190 of 1493
Page 1191
3. Products will be kept in their original containers with the original manufacturer's label
in legible condition.
4. Substances will not be mixed with one another unless recommended by the
manufacturer.
5. Whenever possible, all of a product will be used up before disposing of the container.
6. Manufacturer's recommendations for proper use and disposal will be followed.
7. The job site superintendent will be responsible for daily inspections to ensure proper
use and disposal of materials.
B. Hazardous Products
These practices will be used to reduce the risks associated with hazardous materials. Material
Safety Data Sheets (MSDS's) for each substance with hazardous properties that is used on the job
site will be obtained and used for the proper management of potential wastes that may result
from these products. An MSDS will be posted in the immediate area where such product is stored
and/or used and another copy of each MSDS will be maintained in the SWPPP file at the job site
construction trailer office. Each employee who must handle a substance with hazardous
properties will be instructed on the use of MSDS sheets and the specific information in the
applicable MSDS for the product he/she is using, particularly regarding spill control techniques.
1. Products will be kept in original containers with the original labels in legible condition.
2. Original labels and material safety data sheets (MSDS's) will be procured and used for
each material.
3. If surplus product must be disposed of, manufacturer's or local/state/federal
recommended methods for proper disposal will be followed.
4. A spill control and containment kit (containing for example, absorbent such as kitty
litter or sawdust, acid neutralizing powder, brooms, dust pans, mops, rags, gloves,
goggles, plastic and metal trash containers, etc.) will be provided at the storage site.
5. All of the product in a container will be used before the container is disposed of. All
such containers will be triple rinsed with water prior to disposal. The rinse water used
in these containers will be disposed of in a manner in compliance with state and federal
regulations and will not be allowed to mix with storm water discharges.
C. Hazardous Waste
All hazardous waste materials will be disposed of by the Contractor in the manner specified by
local, state, and/or federal regulations and by the manufacturer of such products. Site
personnel will be instructed in these practices by the job site superintendent, who will also be
responsible for seeing that these practices are followed.
D. Product Specific Practices
The following product specific practices will be followed on the job site.
1. Petroleum Products
Multifamily Development
6/17/26
Page 19 of 23
Page 1191 of 1493
Page 1192
All onsite vehicles will be monitored for leaks and receive regular preventative
maintenance to reduce the chance of leakage. Petroleum products will be stored in
tightly sealed containers which are clearly labeled. Any petroleum storage tanks stored
onsite will be located within a containment area that is designed with an impervious
surface between the tank and the ground. The secondary containment must be
designed to provide a containment volume that is equal to 110% of the volume of the
largest tank. Drip pans shall be provided for all dispensers. Any asphalt substances
used onsite will be applied according to the manufacturer's recommendations. The
location of any fuel tanks and/or equipment storage areas must be identified on a plan
by the contractor once the locations have been determined.
2. Fertilizers
Fertilizers will be applied only in the minimum amounts recommended by the
manufacturer. Once applied, fertilizer will be worked in the soil to limit exposure to
stormwater. Storage will be in a covered shed. The contents of any partially used bags
of fertilizer will be transferred to a sealable plastic bin to avoid spills.
3. Paints, Paint Solvents, and Cleaning Solvents
All containers will be tightly sealed and stored when not in use. Excess paint and
solvents will not be discharged to the storm sewer system but will be properly disposed
of according to manufacturer's instructions or state and federal regulations.
4. Concrete Wastes
Concrete trucks will be allowed to wash out or discharge surplus concrete or drum wash
water on the site, but only in either (1) specifically designated diked areas which have
been prepared to prevent contact between the concrete and/or wash out and storm
water which will be discharged from the site or (2) in locations where waste concrete
can be poured into forms to make riprap or other useful concrete products.
The hardened residue from the concrete wash out diked areas will be disposed of in the
same manner as other non-hazardous construction waste materials or may be broken up
and used on site as deemed appropriate by the Contractor. The job site superintendent
will be responsible for seeing that these procedures are followed.
All concrete wash out areas will be located in an area where the likelihood of the area
contributing to storm water discharges is negligible. If required, additional BMPs must
be implemented to prevent concrete wastes from contributing to storm water
discharges. The location of concrete wash out area(s) must be identified on a plan by
the contractor once the locations have been determined. In addition, a standard detail
on the construction of the concrete wash out shall be included on this plan.
E. Solid and Construction Wastes
All waste materials will be collected and stored in an appropriately covered container and/or
securely lidded metal dumpster rented from a local waste management company which must be
a solid waste management company licensed to do business in New York and the Town of Orchard
Park. The dumpster will comply with all local and state solid waste management regulations.
All trash and construction debris from the site will be deposited in the dumpster. The dumpster
will be emptied a minimum of twice per week or more often if necessary, and the trash will be
Multifamily Development
6/17/26
Page 20 of 23
Page 1192 of 1493
Page 1193
hauled to a landfill approved by the NYSDEC. No construction waste materials will be buried on
site. All personnel will be instructed regarding the correct procedures for waste disposal.
All waste dumpsters and roll-off containers will be located in an area where the likelihood of the
containers contributing to storm water discharges is negligible. If required, additional BMPs must
be implemented, such as sandbags around the base, to prevent wastes from contributing to
storm water discharges. The location of waste dumpsters and roll-off containers must be
identified on a plan by the contractor once the locations have been determined.
F. Sanitary Wastes
Portable toilet units or field offices with toilet facilities connected to the municipal sanitary
sewer will be used for sanitary purposes. All portable toilet units will be emptied a minimum of
once per week by a licensed portable facility provided in compliance with local and state
regulations.
All sanitary waste units will be located in an area where the likelihood of the unit contributing to
storm water discharges is negligible. If required, additional BMPs must be implemented, such as
sandbags around the base, to prevent wastes from contributing to storm water discharges. The
location of sanitary waste units must be identified on a plan by the contractor once the locations
have been determined.
G. Contaminated Soils
Any contaminated soils (resulting from spills of materials with hazardous properties) which may
result from construction activities will be contained and cleaned up immediately in accordance
with the procedures given in the Materials Management Plan and in accordance with applicable
state and federal regulations.
118.3 SPILL PREVENTION AND RESPONSE PROCEDURES
The Contractor will train all personnel in the proper handling and cleanup of spilled materials.
No spilled hazardous materials or hazardous wastes will be allowed to come in contact with
storm water discharges. If such contact occurs, the storm water discharge will be contained on
site until appropriate measures in compliance with state and federal regulations are taken to
dispose of such contaminated storm water. It shall be the responsibility of the job site
superintendent to properly train all personnel in spill prevention and clean up procedures.
A. In order to minimize the potential for a spill of hazardous materials to come into contact with
storm water, the following steps will be implemented:
1. All materials with hazardous properties (such as pesticides, petroleum products,
fertilizers, detergents, construction chemicals, acids, paints, paint solvents, cleaning
solvents, additives for soil stabilization, concrete curing compounds and additives, etc.)
will be stored in a secure location, with their lids on, preferably under cover, when not
in use.
2. The minimum practical quantity of all such materials will be kept on the job site.
3. A spill control and containment kit (containing, for example, absorbent materials, acid
neutralizing powder, brooms, dust pans, mops, rags, gloves, goggles, plastic and metal
trash containers, etc.) will be provided at the storage site.
Multifamily Development
6/17/26
Page 21 of 23
Page 1193 of 1493
Page 1194
4. Manufacturer's recommended methods for spill cleanup will be clearly posted and site
personnel will be trained regarding these procedures and the location of the information
and cleanup supplies.
B. In the event of a spill, the following procedures should be followed
1. All spills will be cleaned up immediately after discovery.
2. The spill area will be kept well ventilated and personnel will wear appropriate
protective clothing to prevent injury from contact with the hazardous substances.
3. The project manager and the Engineer of Record will be notified immediately.
Spills of toxic or hazardous materials will be reported to the appropriate federal, state,
and/or local government agency, regardless of the size of the spill. Spills of amounts
that exceed Reportable Quantities of certain substances specifically mentioned in
federal regulations (40 CFR 110, 40 CFR 117, and 40 CFR 302) must be immediately
reported to the EPA National Response Center, telephone 1-100-424-1102 and NYSDEC
Spill Response, telephone 1-800-457-7362. From SWPPP-9 “Reportable Quantity Release
Form” must be filled out.
4. If the spill exceeds a Reportable Quantity, the SWPPP must be modified within seven (7)
calendar days of knowledge of the discharge to provide a description of the release, the
circumstances leading to the release, and the date of the release. The plans must
identify measures to prevent the recurrence of such releases and to respond to such
releases.
C. The job site superintendent will be the spill prevention and response coordinator. He will
designate the individuals who will receive spill prevention and response training. These
individuals will each become responsible for a particular phase of prevention and response. The
names of these personnel will be posted in the material storage area and in the office trailer
onsite.
119 CONTROL OF NON-STORM WATER DISCHARGES
Certain types of discharges are allowable under the NYSDEC SPDES General Permit for Construction
Activity for the State of New York, and it is the intent of this SWPPP to allow such discharges. These
types of discharges will be allowed under the conditions that no pollutants will be allowed to come in
contact with the water prior to or after its discharge. The control measures which have been outlined
previously in this SWPPP will be strictly followed to ensure that no contamination of these non-storm
water discharges takes place. The following allowable non-storm water discharges which may occur at
the job site include:
A. Discharges from firefighting activities.
B. Fire hydrant flushings (see note below)
C. Waters used to wash vehicles or control dust in order to minimize offsite sediment tracking.
D. Routine external building washdown which does not use detergents.
E. Pavement wash waters where spills or leaks of hazardous materials have not occurred or
detergents have not been used.
Multifamily Development
6/17/26
Page 22 of 23
Page 1194 of 1493
Page 1195
F. Air conditioning condensate.
G. Springs or other uncontaminated groundwater, including dewatering ground water infiltration.
H. Foundation or footing drains where no contamination with process materials such as solvents is
present.
Note: The Contractor shall discharge any super-chlorinated water from water distribution pipe
disinfection activities into sanitary sewer system
120 STORM WATER CONTROL FACILITY MAINTENANCE
The frequency of inspections for the bioretention areas shall match the frequencies listed on the
“Bioretention Operation, Maintenance and Management Inspection Checklist” in Appendix L of the SWPPP.
The proposed catch basins, as per section 115, shall be inspected 4 times per year for removal of
floatable debris. Any silt buildup over 6” in depth shall be removed and disposed of properly off-site.
Multifamily Development
6/17/26
Page 23 of 23
Page 1195 of 1493
Page 1196
Appendix A
Site Location Map
Page 1196 of 1493
Page 1197
Site Location Map
Page 1197 of 1493
Page 1198
Appendix B
NYSDEC Notice of Intent (NOI)
Page 1198 of 1493
Page 1199
012345674812 2 5 5840
74512871487 12424
!"#$%$&
'6(833812)*+,-../012345 53812
1 483
58682 7'454897:";<!"=#>?"@!AB
C452 4 8 24885 DEA;B?FA=#GA!HF";IJK!"#L
'6(8338121 MNOPQ&$&PRSGTU
'4463 G?B;
V15 2W64
868(8847
183465( 27 XY53Y18
[08 4Y 712345674812 748584782515 318883465( 27 3 834882 54[C[1 \
Z
[[08 27562151 4Y 384 245 3 ] 53734 7 33888 3 71(82 83 ] 5\
O!
[([34Y83 5 884812W51^74( 826812 628 5 1 W 54 24 WW515 8]15_W 28[[0`0aC4
`0`C4-1624570 26WC65 244 47[]84Y '0]Y87Y 434Y 36(342485
5b685 2431 \
O!
[7[34Y 712345674812 74858475 4841 3415] 458837Y 56 4Y 481 32145b685 W 584 3
8 3758( 882c0V`[d4 [6[212W182431657 65876465 15385876465 74858483\
O!
4Y 5'1' 5843
[08 4Y 8837Y 56 51 4Y 712345674812 7485847 4 7128848123 834882 54[C[1
\
Z
XY5 42 8 2828 26 58'W 783
Page 1199 of 1493
Page 1200
STU8JJ3V5 93L 384 3883MW 35384JJM4R595JM4QQ5 349W5 8593V43895R4X55R
3V54355RW543YTTSTZ
01
234357893 8 595438 327
[TY93V5 93L 384 3883MR598X435R\M3V5] II89985Q3V5^QQ85Q4_9`N5 5438
4R7893 8 595438^ N7 `WL9L433abc]NNdd[efTge [efTgS495h5IW3Q I3V5
27 585O955334 VI53eQ3V5i5335QN59 JL38\53O55bc2jH]4R^ N7 `R435R
k4L4Ma`elgmZ
01
1!1"#$
%1!&11'#"((1"#)*+1
,%"*11--*1*#(1()(1,',-1'10
1./'1-011+1
%!(&*),!('11!1&-11&'(-1)
,!('+!!+11,2)134#1((51/01+011"1
61))11-6-(7181")+19!-(*"1*1-1()(
1#:11'#'-,!('+!!+11,2$
;<<<<<<<<<=>31-(!,?@4-
;<<<<<<<<<3>@41-(!,?34-
;<<<<<<<<<@4A1-(!,?=44-B
C
[T4T8T7453V58IW4 393V893 8W W53859\5559 J5RZ
C
[T4T8TgTUV8VQ3V5QJJO8XR LI53438O8JJ\5I483485R433V5 93L 389835Z
,%D1!)11--1#1)*&.1=4E1-01011"1F-1
1)1!*12
j LI53438Q94389Q4 3 M IWJ84 5O83V25 38glnQ3V5b4384J7893 8 595438
3Q 4 35I8 L9W o5 3454p
01G--:010111*F--(
23435H8 I534JKL4J83MN585O2HKN
mTY93V5 93L 384 3883M9L\o5 332HKN43YTTmT` 3V55qL84J5358 I534J585O
Q I4 3V5bc2 Q5R54J4X5 M43YTTnTZ
C
mT4T7493V5O5rW543 \3485RR LI534383V433V5W o5 3585OWL9L4332HKN`
3V55qL84J53`V49\5594389Q85RW543YTTmT YTTnTQs tltemtllgZ
C
P8Q I 5RL59 3P 5I839
Page 1200 of 1493
Page 1201
_`+4/59 5965499a45-885)5++bc*D654+9d3X0(e94/55f\g854
994/5d395-58C5)b65*4Dh9i*1A1j[1AA@k3585)4ld5+l9c*D
654+e94/55f\g854e55f\5-94/+)9+4\)49)4g4b
012
3455638965
h+4/5)9+4\)49)4g4b4/4/545+/5-9+\)545+94/53445)8++5-+DD
9DD13-545-\48mC4/5349 4545)4g5B69d3X0(n+5a+45k
56549949
565495
1!"#$%&1$
' 56549(94)4*5+9949
,+4-.+45 */95 018
1! 234563758976 :;&1!<&=>112>>1;?$
@A 56549B8CD--5++
3# E>&=2&F
G?&EHIJ039372
K%L
@@+4/5a88C)94)4-55494/5 56549(94)4k
@jo/44b6599Cm49+4/59 596549k
MENE=
345949
@O*9P5)43455
Q=>R$!S1N1 T$1>
@U345D--5++
3976G?&EHIV E
#12>%11?J039779
W1
X0(Y5C9
Z
@[345.44\-5].9C4\-5
97;^332Z66J52^;248887^
*9P5)4X548+
Page 1201 of 1493
Page 1202
iV)%$'_j-$@<B%$$%"#%$0",`
023456782693426996436 7632334433 46375942237 4296 76
k;"'$&)'7,":'/&&A7'0+??@#9',V+<?'",V+<?'4"0X77'#9%=."01*23245233l-0+#A7",&%"#
"0&)'/"#$&,@/&%"#+/&%8%&A0+??$@#9',V+<?'46,'>+,9?'$$"0&)'$%m'"0&)'9%$&@,<+#/'6$'?'/&
nV+<?'4n
!"#$%$&'#&(%&)*+,&---./%"01*2324523367,"8%9'+/"#/%$'"8',8%'("0&)'7,":'/&
;'$/,%<''=%$&%#>+#97,"7"$'9/"#9%&%"#$6+#9%#/?@9'+#A"&)',,'?'8+#&%#0",B+&%"#
9543 4673C2694356234567826934367DEFGH8496I34DFJH8496463DFKH8496
7425663435I376363L84965M3456782693495323459563553296 7N94OI5637
67 4 O46I86996I9O694OI4452 94O9 7346559695287746 246234595694O
3O755I7854672376367 3659695KJL2759647 395687 423
73P9 6QEQ275596 547R3463MHDSF6333763 46
T467663673C2659627 OI627 O6395687I4686879 793857 D27 OF
96946956877 I73846364 7566463427
UV"&+?W%&'X,'+Y+/,'$Z
KK
43V"&+?X,'+&"<';%$&@,<'9Y+/,'$Z
QG
4[=%$&%#>-B7',8%"@$X,'+&"<';%$&@,<'9Y+/,'$Z
\\
44]@&@,'-B7',8%"@$X,'+^%&)%#;%$&@,<'9X,'+Y+/,'$Z
E\
_+&@,'"0&)'7,":'/&`
aM34567826934
4o;"A"@7?+#&"9%$&@,<B",'&)+#5+/,'$"0$"%?+&+#A"#'&%B'l
b5
347c3 7637856667d89746594 76TK379568794OO7 676 49275
643469
G492667246ODeF3 2f 733O92S39g738 DfSgF66596
XYhZ
\
.YhZ
\
!YhZ
\
Page 1202 of 1493
Page 1203
0234
566
789 9
0
6656
0
556
7!9" # $ #24$ $% 9
&'()*+,-
7B9C# $ # ; 7!D
.'()*+,/','0*)12304-,45(46+17+184('
7E9F $ #; 7! GHG24 %? I J0
@=KHK78KHHLD
96
7M9"N < I J>@=KHK78KHHLD
96
GH9< N$ % $ LHHN
D
96
GL90 ? $ # ?2% O$O
O O 4D
96
G79< % # # PQI%
RS T$D
96
GG9" #$ # #O % #O % ?
% ? D
96
: ;<===>?
@ <===: ;?
GU9F<=== ? $ ;? ="""9@=KHK78KHHLD
A'-
G890 <=== ? #S ? %
>::IO!PQ>::=UMHO % ="""9I979@=KHK78K
HHLD
A'-
G!9F ; ? > ? <===
? $ PQ ? >
2SV VS4D
A'-
Page 1203 of 1493
Page 1204
K_` %#$ !%#>9!&%#Z9#1!&%#! ' # & 0 &# 9#19 9! !& &#!"#$ 67888a &
( b ?! (1&9!&"! &9 '1#$#$ c66#! ' # d & 0 &#S %10&d &Z ?e
012
K_7$19$b %1!&!"#$ c66#! ' # d & 0 &#S %10&d &Z ?' %Z% (#!( b ?! #$
67888e
3435
678888
Kfg$ 6#! ' # 8!??Z#1!&8 b !&8?&h67888i' % (ajk
12211
!"#$ %!&'$! (#$ 67888
)*+,-1
.678888 / 0 &12#1!&
345-612
7678888 8!	#:&"! #1!&
;1%# &(< %# 8$!& => 1?
)*+,-1 @ABCD53CEABF G-1HI4J--12I4
K678888 L(( %%
D4M3*,NJOMP*1A44
QPOR0A534E
S!'&?! (678888 8 #1"19 #1!&;!
121*T1*+1J2*1G2*G1G1-PG-,PG1G1I1*I*4U
A3IT*+1TV1J*-J-VTI1*I*4
3W+1I1*1-M5G1G12+P-2*+24
EXG-*+1I4G1*1-4
6J-M51G131*I*Y4
8? % Z ?! (#$ 678888 8 #1"19 #1!&
2JGGI1*421-G-C4F[3B[343BA3UF4\
8! &#
` %#$ 678888 8 #1"19 #1!&;! a &%10& (aj#$ 67888 1&
99!( &9 '1#$8 #l::m!"n8>>7o>.e
012
=!%1!&]6 (1 !&#!?8 1# 1
o` % 9!&%#Z9#1!&% pZ &9 %9$ (Z? "! #$ ?&& ( & 0 &# 9#19 %a & (e
012
8!%#>8!&%#Z9#1!&8 1# 1
61# 8?&&1&0 &(6!1?^ %#! #1!&
Page 1204 of 1493
Page 1205
4c6-d?+9*1C2-)00-O1*+-F0)9919:-F,)A*1A+O-*P)*-e+,+-/O+?-*<-F,+F),+-*P+-C19)0-O1*+-F0)9f0)2</*-C<,-*P+
F,<Q+A*6
0123214567898 9 73612 125
0123214567898 213
2 67898 2517959 15 79
4g6-d9?1A)*+-eP1AP-<C-*P+-C<00<e19:-O<10-,+O*<,)*1<9-A,1*+,1)-e)O-/O+?-*<-)??,+OO-*P+-,+>/1,+H+9*O-19
7+A*1<9-W6R6c-@h7<10-E+O*<,)*1<9hD-<C-*P+-^+O1:9-G)9/)06
73612 51253721236812 7958159276628723681567891271229637952 8 62
!2379"595#322$52%&&'
()*+,-./)01*2-3,1*+,1)
456-()*+,-./)01*2-71819:-3,1*+,1)
;<*)0-(.= ;<*)0-EE= ;<*)0-(.= 7/H-<C-EE=-)9?
,+>/1,+?-@)A,+B F,<=1?+?-@)A,+B G1@91 H/H-EE= F,<=
)A,+BC++*D 1?+?-@)A,+B (.=-F,<=1?+?
C++*D C++*D C++*D
I&JK ILIL IIJM ILJK I&JM
456)6-NO+-*P1O-OF)A+-*<-O/HH),18+-*P+-OF+A1C1A-O1*+-01H1*)*1<9O-)9?-Q/O*1C1A)*1<9-C<,-9<*-,+?/A19:
RSST-<C-(.=-,+>/1,+?6
76277656789379 238737638797615678915623#U$2!'
()*+,-./)9*1*2-3,1*+,1)
WR6-^<+O-<9+-<C-*P+-e)1=+,-A<9?1*1<9O-)FF02-*<-*P+-AP)99+0-F,<*+A*1<9-C<,-*P1O-A<9O*,/A*1<9
)A*1=1*2i
V8
WR6X616-3Y=-E+>/1,+?-@)A,+BC++*D
IL&&
WR6X6116-3Y=-Y,<=1?+?-@)A,+BC++*D
IL&&
W]6-^<+O-<9+-<C-*P+-e)1=+,-A<9?1*1<9O-)FF02-*<-*P+-.F-)9?-.C-C<,-*P1O-A<9O*,/A*1<9-)A*1=1*2i
V8
Z=+,X)9[-\0<<?-3<9*,<0-3,1*+,1)[email protected]
W]6X616-Y,+B^+=+0<FH+9*-@3\7D
_LM
W]6X6116-Y<O*B^+=+0<FH+9*-@3\7D
`J
;<*)0-ab*,+H+-\0<<?-3<9*,<0-3,1*+,1)[email protected]
W]6X61116-Y,+B^+=+0<FH+9*-@3\7D
L_`M
W]6X61=6-Y<O*B^+=+0<FH+9*-@3\7D
`M
ZF+,)*1<9-)9?-G)19*+9)9A+
Page 1205 of 1493
Page 1206
345V66 6 6 96 6 &6 ( J6
6 6 6 01 9 . 9W
012
3456589 6 6 96 6 5
!"#$$1%
&' ( )&89 6
3*5&' ( ++, -( 6 9)6 969)&
++, -( 6 9 ' ( 8 .(/6 ,6' ( /6
)& 061 061
2$334!"4131!34!"52678 9:;
335/ 6 . )&
, 6 (6( <6 ' ( 8 .(
/ 6 . )& / 6 . )& / 6 . )& /6061
&
3R589 XY 6 9 JX66-(9Z[65
=4!1
3\58<866 J [ 6 &685]5W
=4
)*)>&&&/ 6
3^5> ( 6 . J ( 6( 960 1,69 6_6 9U
' )* 6016 996 )*01W
012
3^565>-(9 &685I5̀555W
?@A"@BCCC"DEE1F3!E1"24G
)*)>&&&/ 6 HIJ 69
K4L!$4 M"3N1"?@A"@BCCC"DEE1F3!E1"24G"O4G"3N1"$!P"Q1$4L:"
?@A"@BCCC"DEE1F3!E1"24G
RS5)*/ 6 <T(9 HU69
'
RS565V6 9 6Y ( . 6 a 96b
9(6(c9 6 . 6 b 696 J &6d885T56 9( 96
J <8W
=4
Page 1206 of 1493
Page 1207
011345677896 6879 7 45 5 55943
! "
#$%&'(#)&'*+,'-.&'+/0/1*+/,%
#$%&'(#)&'*+,'-.&'+/0/1*+/,%-2,'3-4,$%5,*6
414 57 5458 53494569:1; 1;9 14
57 5458 5349456
<=>-?)5,*6-#$%&'(#)&'*+,'-.&'+/0/1*+/,%-2,'3
.,33&%+
<=>*>-O*J-+G&-#$%&'(#)&'*+,'-.&'+/0/1*+/,%-2,'3-0',3-@))&%6/H-P-I&&%-J/Q%&6-IF-+G&
,$%&'(,)&'*+,'R-,'-*-'&)'&J&%+*+/S&-,0-+G&-,$%&'(,)&'*+,'-/%-*11,'6*%1&-$/+G-A*'+-TCC>P-,0-UAVWVDXV
WW=-*%6-Y)5,*6&6-+,-+G&-&K#CZ
4
011345677896 6879 7 45 5 55943
! "
@66/+/,%*5-A',B&1+-C%0,'3*+/,%
<D>-E%+&'-*%F-*66/+/,%*5-)&'+/%&%+-)',B&1+-/%0,'3*+/,%-/%-+G&-+&H+-I,H-I&5,$>
@++*1G3&%+J
4*+& @++*1G3&%+-K*3& .,%+&H+ ?J&'
!7L7 L"M! N 7534567 3 0 6 04: 413
Page 1207 of 1493
Page 1208
Appendix C
MS4 SWPPP Acceptance Form
Page 1208 of 1493
Page 1209
MS4 SWPPP Acceptance Form
for construction activities seeking authorization under the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI
and submitted to NYSDEC electronically.)
I. Project Owner/Operator Information
1. Owner/Operator Name: Brian Hillery & William Sahlem
2. Contact Person: Brian Hillery
3. Street Address: 1 Woodthrush Trail
4. City/State/Zip: Orchard Park, NY 14127
II. Project Site Information
5. Project/Site Name: Multifamily Development
6. Street Address: 1425 & 1475 Orchard Park Road
7. City/State/Zip: West Seneca, NY 14224
III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance Information
8. SWPPP Reviewed by:
9. Title/Position:
10. Date Final SWPPP Reviewed and Accepted:
IV. Regulated MS4 Information
11. Name of MS4 Operator:
12. MS4 SPDES Permit Identification Number: NYR20A
13. Street Address:
14. City/State/Zip:
15. Telephone Number:
Page 1 of 2
Page 1209 of 1493
Page 1210
MS4 SWPPP Acceptance Form - continued
V. Certification Statement - MS4 Official (principal executive officer or ranking elected official) or
Duly Authorized Representative
I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project
identified in section II. of this form has been reviewed and meets the substantive requirements in the
SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP).
Note: The MS4 Operator, through the acceptance of the SWPPP, assumes no responsibility for the
accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of
the SWPPP by the MS4 Operator does not relieve the owner/operator or their SWPPP preparer of
responsibility or liability for errors or omissions in the plan.
Printed Name1:
Title/Position:
Signature:
Date:
VI. Additional Information
1 Printed name of the principal executive officer or ranking elected official for the MS4 Operator or their
duly authorized representative in accordance with CGP Part VII.J.2.
(NYSDEC - MS4 SWPPP Acceptance Form - January 2025)
Page 2 of 2
Page 1210 of 1493
Page 1211
Appendix D
Engineer’s Report
Page 1211 of 1493
Page 1212
ENGINEER’S REPORT
for
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, Erie County, New York
Prepared for
Brian Hillery & William Sahlem
1 Woodthrush Trail
Orchard Park, NY 14127
Prepared by
Carmina Wood Design
80 Silo City Row, Suite 100
Buffalo, NY 14203
Telephone: (716) 842-3165
Fax: (716) 842-0263
May 2026
Revised June 2026
Page 1212 of 1493
Page 1213
Table of Contents
Written Engineer’s Report
Section 1 – Location & Description Page 1
Section 2 – Water Service Page 1
Section 3 – Sanitary Sewer Service Page 1
Section 4 – Storm Sewer Service Page 2
Section 5 – Erosion Control Summary Page 3
Section 6 – Geotechnical Items Page 4
Appendices
Appendix A Site Location Map
Appendix B Sanitary Sewer & Water Demand Calculations
Appendix C Downstream Sewer Capacity Analysis Report
Appendix D Storm Water Calculations
Appendix E Soil Information
Page 1213 of 1493
Page 1214
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 1 of 4
6/18/2026
Section 1 – Location & Description
This new development project involves the construction of three (3) 4-unit, one (1) 5-unit and two (2) 6-
unit ranch style townhomes, for a total of 29 units. Construction will also consist of associated parking,
storm water management, utility, lighting, and landscaping improvements. The site is currently vacant
consisting of grass, brush and tree cover. The total area of the site is 16.59 acres with an area of
disturbance of approximately 7.37 acres. The site has been rezoned to C-1(S) to allow for the development.
See Appendix A for Site Location Map.
Section 2 – Water System
The proposed 6” combined water service will connect to an existing 8” PVC water main located on the west
side of Orchard Park Road. The proposed service will tap the main and enter a heated enclosure where an
RPZ and meter will be provided. The combined service will enter the buildings and reduce to a 2” domestic
service. Two (2) private fire hydrants are proposed to provide fire protection. Drainage from the hotbox
due to testing or failure will be via gravity to the nearest drainage inlet. Water inside the building will be
used for typical bathroom and janitorial uses.
Domestic Summary:
Peak Operating Demand: 87 gpm
Water Main: 8” PVC water main along Orchard Park Road
Static Pressure: 70 psi
Friction Loss: 0.2 psi
Elevation Loss: -2.0 psi
Meter & RPZ Loss: 13 psi
Pressure at furthest unit: 58.8 psi
Fire Summary:
Peak Operating Demand: 1,000 gpm
Water Main: 8” PVC water main along Orchard Park Road
Static Pressure: 70 psi
Friction Loss: 12.6 psi
Elevation Loss: -2.0 psi
Meter & RPZ Loss: 13 psi
Pressure at furthest hydrant: 46.4 psi
Repairs to all devices will be made during off hours; dual backflow preventers are not required. The site is
not located in a 100-year flood plain.
Disinfection of the water service following installation will be continuous feed, according to AWWA C-651,
latest revision.
See Appendix B for Sanitary Sewer & Water Calculations.
Section 3 – Sanitary Sewer Service
The proposed sanitary sewer service will connect to an existing manhole located along the west side of
Orchard Park Road. The proposed service will consist of approximately 691 LF of 8” SDR-35 PVC private
sanitary sewer main at a slope of 0.4%, 346 LF of 6” SDR-35 PVC sanitary sewer lateral at a minimum slope
of 1.0% and 285 LF of 3” SDR-21 PVC force main with a minimum cover of 4’.
Page 1214 of 1493
Page 1215
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 2 of 4
6/18/2026
Design Parameters:
Multifamily Development: 29 units x 220 gpd/unit = 6,380 gpd
Since the sanitary sewer extension is designed to convey greater than 2,500 gpd, a downstream sewer
capacity analysis was performed to ensure that the existing sewer could handle the additional flow.
The hydraulic loading rates per “Design Standard for Wastewater Treatment Works” 2014, NYSDEC.
See Appendix B for Sanitary Sewer & Water Calculations
See Appendix C for Downstream Sewer Capacity Analysis Report
Section 4 – Storm Sewer Service
The existing site sheet drains from east to west to a USACE jurisdictional wetland area at the rear of the
site.
The proposed development will replicate the existing hydrology of the site. The proposed hydrology for the
development project area will consist of overland sheet flow and pipe channel flow. The storm sewer
system for this site will consist of 6”, 8” and 12” HDPE pipes connected by a series of catch basins and yard
drains. Stormwater runoff generated from the site will enter the pipe network and be conveyed to a
detention basin on the west side of the site. The detention basin will discharge runoff, at a controlled rate,
to the existing wetlands. To meet NYSDEC water quality requirements, runoff will be conveyed to a
bioretention areas prior to the detention basin. Runoff that is currently being discharged on to the site
from the church parking lot to the east will be collected and piped to the west side of the site.
Design Criteria
Storm pipes: 10-year storm
Detention: Comparison of the existing 1-year vs. the proposed 1-year runoff.
Comparison of the existing 10-year vs. the proposed 10-year runoff.
Comparison of the existing 10-year vs. the proposed 25-year runoff.
Comparison of the existing 100-year vs. the proposed 100-year runoff.
Stormwater Runoff Summary:
To Detention:
Event Prop. Runoff (cfs) Elevation (ft) Storage (cf)
1-yr 1.83 670.86 4,596
10-yr 2.80 672.91 14,741
25-yr 3.08 673.66 20,871
100-yr 3.43 674.69 34,430
Direct:
Event Prop. Runoff (cfs)
1-yr 0.38
10-yr 1.12
25-yr 1.57
100-yr 2.52
Total Site:
Event Ex. Runoff (cfs) Prop. Runoff (cfs)
1-yr 2.63 1.87
10-yr 8.17 2.89
25-yr 11.66 3.23
100-yr 18.97 4.61
Page 1215 of 1493
Page 1216
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 3 of 4
6/18/2026
See Appendix D for Storm Water Calculations
Section 5 – Erosion Control Summary
Stabilization Practices
Stabilization practices for this site include:
A. Land clearing activities shall be done only in areas where earthwork will be performed and shall
progress as earthwork is needed.
B. Use of stabilization fabric for all slopes having a slope greater than 1V:3H.
C. Permanent seeding and planting of all unpaved areas using the hydromulching grass seeding
technique.
D. Mulching exposed areas.
E. Frequent watering to minimize wind erosion during construction.
Structural Practices
Structural practices for this site include:
A. Inlet protection using a method detailed in the Construction Documents
B. Perimeter protection using temporary silt fence
C. Temporary stone wash off areas
Sequence of Major Activities
The Contractor will be responsible for implementing the following erosion control and storm water
management control measures. The Contractor may designate these tasks to certain subcontractors as he
sees fit, but the ultimate responsibility for implementing these controls and ensuring their proper
functioning remains with the Contractor. The order of activities will be as follows:
A. Construct temporary construction exit at location shown on the Demo & Erosion Control Plan Sheet.
B. Install perimeter silt fences in the locations shown on the Demo & Erosion Control Plan Sheet.
C. Install protective fencing around cemetery as noted on the Demo & Erosion Control Plan Sheet.
D. Clear and grub site within disturbance (silt fence) limits.
E. Installation of detention basin to act as sediment basin (do not install bioretention soil or underdrains
until stabilized)
F. Commence site grading.
G. Disturbed areas of the site where construction activity has ceased for more than 14 days shall be
temporarily seeded and watered.
H. Construction of buildings.
I. Installation of proposed utilities.
J. Finalize pavement subgrade preparation.
K. Construct all curb, drainage inlets, storm sewer pipes and storm sewer manholes, as shown on the
plans. Install temporary inlet protection at the locations of all new inlets.
L. Dust control.
M. Remove inlet protection around inlets and manholes no more than 48 hours prior to placing stabilized
base course.
N. Install base material as required for pavement.
O. Carry out final grading and seeding and planting.
P. Clean storm system following construction.
Q. Remove silt fencing only after all paving is complete and exposed surfaces are stabilized.
Page 1216 of 1493
Page 1217
Multifamily Development
1425 & 1475 Orchard Park Road
West Seneca, NY 14224
Page 4 of 4
6/18/2026
Section 6 – Geotechnical Items
According to the USDA Web Soil Survey, the onsite soil is made up of Darien silt loam, Niagara silt loam and
Remsen silty clay loam. These soils are categorized under hydrologic soil groups C/D and D and will have a
slow infiltration rate when thoroughly wet.
See Appendix D for Soil Information.
Page 1217 of 1493
Page 1218
Appendix A
Site Location Map
Page 1218 of 1493
Page 1219
Site Location Map
Page 1219 of 1493
Page 1220
Appendix B
Sanitary Sewer & Water Demand Calculations
Page 1220 of 1493
Page 1221
CARMINA WOOD DESIGN Project No.: 23-4121 Date: 5/22/2026
80 Silo City Row, Suite 100 Project Name: Multifamily Development
Buffalo, New York 14203 Project Address: 1425-1475 Orchard Park Road - West Seneca
(716) 842-3165 Subject: Sanitary Sewer Demand Calcs
FAX (716) 842-0263 Sheet: 1 of 1
Sanitary Sewage Demand Calculations:
Proposed Townhomes
220 gal/d/unit x 29 units = 6,380 gpd *use 220 gallons per unit per day (2-bdrm)
Find Peak Sanitary Demand:
Peaking Factor based on Population:
Total demand: 6,380 gpd / 51.96 gpcd = 123 per capita
Population (P) = 123 people
Peaking Factor : (18 +√P) / (4 + √P ) where P is in thousands
Peaking Factor = 4.22
Peak Sanitary Demand = 6,380 x 4.22 = 26,911 gpd
= 0.027 MGD
= 0.042 cfs
Required Infiltration and Inflow Mitigation:
Mitigation Fee = $2.40 /gal = $15,312.00
Page 1221 of 1493
Page 1222
Carmina Wood Design Project No.: 23-4121 Date: 5/18/2026
80 Silo City Row, Suite 100 Project Name: Multifamily Development
Buffalo, NY 14203 Project Address: 1475 Orchard Park Road - Town of West Seneca
(716) 842-3165 Subject: Sanitary Sewage Pump Station Design
FAX (716) 842-0263 Sheet: 1 of 1
Sanitary Sewage Demand Calculations:
Proposed Apartments
220 gpd/unit x 25 units = 5,500 gpd
Average Site Sanitary Flow: = 5,500 gpd
Peak Site Sanitary Flow: = 22,000 gpd
PF = 4.0
* assume flow over 18 hour period
Peak Site Sanitary Flow: = 20.4 gpm
8" inlet into pump station invert: 670.68
Forcemain invert at tie into downstream sewer: 676.55
Pump chamber diameter: 5 ft ( 147 gal/ft)
Storge required:
* use filling time of 30 minutes @ 20.4 gpm (peak flow)
Storage required = 20.4 gpm x 30 mins = 4.16 ft
147 gal
Top of pump station: 682.40
Inlet & Alarm: 670.68
2 pumps on: 670.18 (inlet minus 0.5 ft)
1 pump on: 669.68 (2 pumps on minus 0.5 ft)
pumps off: 665.52 (1 pump on minus storage required)
Bottom of station: 664.27 (pumps off minus 1.15 ft)
Total depth: 18.13 ft
Cleansing velocity:
Using a 3 inch forcemain, find flow for min 2 fps cleansing velocity
A= 0.05 ft2
2
Q=VxA= 2 fps x 0.05 ft = 0.09817 cfs = 44.1 gpm
Page 1222 of 1493
Page 1223
CARMINA WOOD DESIGN Project No.: 23-4121 Date: 5/22/2026
80 Silo City Row, Suite 100 Project Name: Multifamily Development
Buffalo, New York 14203 Project Address: 1425-1475 Orchard Park Road - West Seneca
(716) 842-3165 Subject: Water Demand Calcs
FAX (716) 842-0263 Sheet: 1 of 1
Water Demand Calculations (domestic):
Townhome Development:
Q = 3 gpm/unit x 29 units = 87 gpm ECDOH Requirement
Water Demand Calculations (fire):
Q= 1500 gpm * per ISO Guidelines
Elev. at ex. residual hydrant = 684.5 ft
Static pressure at ex. hydrant = 70 psi
El. @ road tap = 684.5 ft
Δ elev ex. hydrant to road tap = 0 ft = 0.0 psi (positive is decrease in pressure from static)
(negative is increase in pressure from static)
Static pressure at road tap = 70.0 psi
El. @ furthest building = 679.9 ft
Δ elev road tap to furthest building = -4.6 ft = -2.0 psi (positive is decrease in pressure from static)
(negative is increase in pressure from static)
Find residual at furthest unit using domestic flow:
Headlosses:
Qpeak = 87.0 gpm
Pipe = 6 inch PVC C = 150
Length = 646 LF (approx. distance from tap to furthest building)
10.44 L Q1.85 10.44(646)(87)1.85
HL = 1.85 4.866 = = 0.40 ft = 0.2 psi
C D (150)1.85 (6)4.866
Loss through 6-inch RPZ & meter = 13 psi
Residual pressure at furthest unit = Static pressure at road tap - headlosses - Δ elev
=70.0 - 0.2 - 13 - (-2)
= 58.8 psi
Find residual at furthest hydrant using fire flow:
Headlosses:
Qpeak = 1000 gpm
Pipe = 6 inch PVC C = 150
Length = 509 LF (approx. distance from tap to furthest hydrant)
10.44 L Q1.85 10.44(509)(1000)
1.85
HL = 1.85 4.866 = 1.85 4.866 = 29.05 ft = 12.6 psi
C D (150) (6)
Loss through 6-inch RPZ = 13 psi
Residual pressure at furthest unit = Static pressure at road tap - headloss - Δ elev
= 70.0 - 12.6 - 13 - (-2)
= 46.4 psi
Page 1223 of 1493
Page 1224
Appendix C
Downstream Sewer Capacity Analysis Report
Page 1224 of 1493
Page 1225
TOWN OF WEST SENECA
TOWN SUPERVISOR
GARY A. DICKSON
TOWN COUNCIL
JEFF PIEKAREC
ENGINEERING DEPARTMENT SCOTT ROBERTSON
ROBERT BREIDENSTEIN
MARY SHERMAN
1/6/2026
Jeffrey Scheiber
Code Enforcement Officer
Town of West Seneca
Re: Proposed Townhouses (1425 Orchard Park Road)
Sanitary Sewer Capacity Analysis (Revised December 2025)
Dear Mr. Schieber,
In January 2025, the Town Board approved the discharge of sanitary sewage flow from the proposed
developments at 1425 Orchard Park Road and 1130 Orchard Park Road into the Town’s existing 10” sewer
main located along Orchard Park Road which is part of the Town’s Sewer District 13.
At that time, the proposed average daily flow from 1425 Orchard Park Road development was calculated to
be 7,040 gallons per day. This volume was based on a total of (32) 2-bedroom apartments, assuming 110
gallons per day per bedroom.
PROPOSED CHANGES:
The developer is now proposing to construct twenty-nine (29) 2-bedroom townhouses instead of the
apartment units, which has reduced the proposed sewage flow from 7,040 gallons per day to 6,380 gallons
per day, assuming 110 gallons per day per bedroom.
CONCLUSION:
Since the proposed sewer flow for the twenty nine, 2 bedroom townhouses is less than the previously
approved apartments, I have no additional concerns with the capacity of the sewer.
SEWER MITIGATION FEE
Please note in July 2024 the Town increased the cost per gallon for the sewer mitigation fee from
$1.20/gallon to $2.40/gallon. The original application was submitted prior to that date but the revised
project for 1425 Orchard Park Road was submitted after the fee changed, so I am proposing to utilize the
new fee to calculate the total amount for the revised project as follows:
TOWN HALL 1250 UNION ROAD· WEST SENECA. NEW YORK 14224 • (716) 558-3220 • FAX (716) 677-5448
www.westseneca.net
Page 1225 of 1493
Page 1226
1425 Orchard Park Road:
6,380 GPD (increase of average daily flow)
x $2.40 ($/gallon)
$15,312
A sewer mitigation fee, as calculated above, should be collected by your office and applied toward the sewer
repair fund for Sewer District 13.
Very truly yours,
Jason A. Foote, P.E.
Town Engineer
cc: Files:
Chris Trapp, Town Attorney
Supervisor Dickson and Town Board Members
TOWN HALL 1250 UNION ROAD· WEST SENECA. NEW YORK 14224 • (716) 558-3220 • FAX (716) 677-5448
www.westseneca.net
Page 1226 of 1493
Page 1227
DOWNSTREAM SANITARY SEWER CAPACITY
ANALYSIS REPORT
for
Proposed Apartments
1425 Orchard Park Road
Town of West Seneca, Erie, NY
Prepared for
William Sahlem and Brian Hillery
1 Woodthrush Trail,
Orchard Park, NY 14127
Prepared by
Carmina Wood Design
487 Main Street, Suite 500
Buffalo, NY 14203
Telephone: (716) 842-3165
Fax: (716) 842-0263
December 2023
Page 1227 of 1493
Page 1228
Project Description
This project is a development of a 3.17 acre +/- site located on the west side of Orchard Park Road in the Town of
West Seneca. The property will be developed with (26) 2-bedroom apartment units and (4) 3-bedroom apartment
units. This analysis will also include the recently approved multi-family project at 1130 Orchard Park Road (45 2-
bedroom units).
The proposed sewer service for this development will connect to an existing 10” Town of West Seneca sewer main
the runs along the west side of Orchard Park Road.
Node 1 – 1001 Orchard Park Rd (12”):
Existing Peak Flow measured (wet weather event) = 2.844 cfs (1.838 mgd)*
Proposed Apartments Peak Flow (Flattery’s) = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road) = 0.046 cfs**
Proposed Total Peak Flow = 2.955 cfs
Theoretical capacity of existing 12” pipe @ 0.36% = 2.314 cfs
Conclusion: Monitored flows the day following the 0.72” rainfall event exceeded the capacity of the existing pipe
12” sewer. One time during the monitoring period the flow depth exceeded the pipe diameter at Node 1, but at
no time during the monitoring period did the flow at any point slow or stall which would have caused a backup or
flooding at the manhole. The 12” sewer receives surcharges from a 27” sewer and 36” sewer downstream during
high rainfall events. Outside of these events, the 12” sewer has ample capacity to handle the additional proposed
total peak flow. I/I mitigation shall be required for the contribution proposed for this project.
Node 2 – Orchard Park Rd (15”):
Existing Peak Flow measured (wet weather event) = 2.917 cfs (1.885 mgd)*
Proposed Apartments Peak Flow (Flattery’s) = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road) = 0.046 cfs**
Proposed Total Peak Flow = 3.028 cfs
Theoretical capacity of existing 15” pipe @ 0.34% = 4.077 cfs
Conclusion: The proposed total peak flow is less than the capacity of the 15” pipe, therefore there is sufficient
capacity. One time during the monitoring period the flow depth exceeded the pipe diameter at Node 2, but at no
time during the monitoring period did the flow at any point slow or stall which would have caused a backup or
flooding at the manhole. The 15” sewer receives surcharges from a 27” sewer and 36” sewer downstream during
high rainfall events. Outside of these events, the 15” sewer has ample capacity to handle the additional proposed
total peak flow. I/I mitigation shall be required for the contribution proposed for this project.
Proposed Apartments
10/3/2022
Page 1 of 2
Page 1228 of 1493
Page 1229
Node 3 – Orchard Park Rd & Fairfax (48”):
Existing Peak Flow measured (wet weather event) = 14.470 cfs (9.352 mgd)*
Proposed Apartments Peak Flow (Flattery’s) = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road) = 0.046 cfs**
Proposed Total Peak Flow = 14.581 cfs
Existing Peak Flow measured (overall) = 16.150 cfs (10.438 mgd)*
Proposed Apartments Peak Flow (Flattery’s) = 0.065 cfs**
Proposed Apartments Peak Flow (1425 OP Road) = 0.046 cfs**
Proposed Total Peak Flow = 16.261 cfs
Theoretical capacity of existing 48” pipe @ 0.15% = 60.218 cfs
Conclusion: The proposed total peak flow is less than the capacity of the 48” pipe, therefore there is sufficient
capacity. At no time during the monitoring period did flow depth exceed the pipe diameter at Node 3 of the
downstream monitoring points during the rain events monitored.
Foot Notes:
Downstream capacity node information provided by Town of West Seneca
*Converted from measurements in TECSmith report dated 9/15/22 & 4/19/22
** See Sanitary Sewage Demand Calculations
Proposed Apartments
10/3/2022
Page 2 of 2
Page 1229 of 1493
Page 1230
Location Map
Page 1230 of 1493
Page 1231
Page 1231 of 1493
Page 1232
Sanitary Demand Calculations
Page 1232 of 1493
Page 1233
CARMINA WOOD DESIGN Project No.: 23-4121 Date: 12/11/2023
487 MAIN STREET, SUITE 500 Project Name: Proposed Apartment Development
BUFFALO, NEW YORK, 14203 Project Address: 1425 Orchard Park Road
(716) 842-3165 Subject: I & I Mitigation
FAX (716) 842-0263 Sheet: 1 of 1
Sanitary Sewage Demand Calculations:
Proposed Development
220 gal/d/unit x 26 units = 5,720 gpd *use 220 gal/d/unit (2-bdrm apt)
330 gal/d/unit x 4 units = 1,320 gpd *use 330 gal/d/unit (3-bdrm apt)
Total Site Sanitary Demand: = 7,040 gpd
Find Peak Sanitary Demand:
Peaking Factor based on Population:
Total demand: 7,040 gpd / 52 gpcd = 135 per capita
Population (P) = 135 people
Peaking Factor : (18 +√P) / (4 + √P ) where P is in thousands
Peaking Factor = 4.21
Peak Sanitary Demand = 7,040 x 4.21 = 29,604 gpd
= 0.030 MGD
= 0.046 cfs
Required Infiltration and Inflow Mitigation:
Total Sanitary Flow = 7,040 gpd
Mitigation Credit = $1.20 / gpm (Town of West Seneca)
Mitigation Agreement Amount = $8,448.00
Page 1233 of 1493
Page 1234
CARMINA WOOD DESIGN Project No.: 22.128 Date: 10/3/2022
487 MAIN STREET, SUITE 500 Project Name: Residential Apartments
BUFFALO, NEW YORK, 14203 Project Address: 1130 Orchard Park Road West Seneca, NY
(716) 842-3165 Subject: Sanitary Sewer Demand Calcs
FAX (716) 842-0263 Sheet: 1 of 1
Sanitary Sewage Demand Calculations:
Proposed Apartments
220 gal/d/unit x 45 units = 9,900 gpd *use 220 gallons per unit per day (2-bdrm)
Total Site Sanitary Demand: = 9,900 gpd
Find Peak Sanitary Demand:
Peaking Factor based on Population:
Total demand: 9,900 gpd / 100 gpcd = 99 per capita
Population (P) = 99 people
Peaking Factor : (18 +ÖP) / (4 + ÖP ) where P is in thousands
Peaking Factor = 4.24
Peak Sanitary Demand = 9,900 x 4.24 = 42,023 gpd
= 0.042 MGD
= 0.065 cfs
Required Infiltration and Inflow Mitigation:
Peak Sanitary Flow = 42,023 gpd = 29.18 gpm
4:1 offset flow per NYSDEC requirements = 29.18 x 4 = 116.73 gpm req'd
Mitigation Credit = 30 gpm / lateral
Laterals to be replaced* = 3.9 laterals
= 4 laterals *(or other mitigation as identified by the Town)
From DSCA for Multi-family project
at 1130 Orchard Park Road
Page 1234 of 1493
Page 1235
TECSmith Monitoring Report
Page 1235 of 1493
Page 1236
Date Node 1 Node 2 Rain 2 Date Node 3 Rain 2 Snow
1001 Orchard Park Rd (12") Orchard Park Rd 15" (15") Orchard Park Rd & Fairfax (48")
FLOW PEAK FLOW PEAK FLOW PEAK FLOW PEAK (inches) FLOW PEAK FLOW PEAK (inches) (inches)
(GAL x 1,000) (MGD) LEVEL (IN) (GAL x 1,000) (MDG) LEVEL (IN) (GAL x 1,000) (MDG) LEVEL (IN)
8/16/2022 89.257 0.440 5.964 168.586 0.721 4.437 0.23 3/17/2022 3196.614 6.783 13.938 0 0
8/17/2022 215.037 0.376 4.744 438.779 0.622 3.770 0 3/18/2022 5684.090 6.485 13.639 0 0
8/18/2022 189.150 0.370 4.686 427.549 0.628 3.826 0 3/19/2022 6314.024 7.874 17.857 0.27 0
8/19/2022 185.188 0.342 4.512 414.203 0.666 4.069 0 3/20/2022 7506.892 9.168 20.985 0.08 0
8/20/2022 202.299 0.331 4.923 396.354 0.689 4.133 0 3/21/2022 6601.632 8.220 19.365 0 0
8/21/2022 242.472 0.443 5.850 452.414 0.758 4.278 0.11 3/22/2022 5911.885 6.708 14.066 0 0
8/22/2022 211.005 0.478 4.897 492.229 0.645 3.891 0.14 3/23/2022 6366.253 9.352 21.857 0.51 0
8/23/2022 205.428 0.447 4.517 162.364 0.422 3.395 0.05 3/24/2022 8410.107 10.438 23.577 0 0
8/24/2022 203.451 0.394 4.725 253.953 0.604 4.307 0.45 3/25/2022 7059.230 8.020 19.386 0 0
8/25/2022 181.878 0.416 4.675 439.324 0.669 4.150 0 3/26/2022 7112.401 8.489 19.148 0.09 0.1
8/26/2022 190.142 0.419 4.851 414.269 0.625 3.883 0 3/27/2022 7001.414 8.461 18.753 0.06 2.3
8/27/2022 177.502 0.405 4.759 424.759 0.670 4.011 0 3/28/2022 6396.917 7.538 17.111 0.01 0.4
8/28/2022 149.262 0.306 4.729 402.881 0.700 4.187 0 3/29/2022 5909.058 6.957 14.053 0 0
8/29/2022 131.545 0.272 4.563 409.867 0.776 4.384 0 3/30/2022 5521.696 6.653 13.811 0.01 0
8/30/2022 277.592 0.705 7.523 530.810 1.126 5.440 0.97 3/31/2022 5943.213 7.661 16.548 0.09 0
8/31/2022 207.872 0.351 5.185 507.470 0.687 4.085 0 4/1/2022 5419.635 6.277 14.053 0.06 0.1
9/1/2022 185.028 0.361 5.419 434.561 0.610 3.756 0 4/2/2022 5147.186 6.140 13.371 0 0
9/2/2022 157.770 0.346 4.843 411.119 0.619 3.892 0 4/3/2022 5083.174 6.186 13.093 0.01 0
9/3/2022 147.788 0.355 5.089 391.309 0.645 4.003 0 4/4/2022 4946.766 6.325 12.723 0 0
9/4/2022 166.764 0.303 4.897 378.377 0.635 3.860 0.04 4/5/2022 4901.882 5.708 12.382 0 0
9/5/2022 464.216 1.838 32.342 716.100 1.885 64.943 0.72 4/6/2022 4842.495 5.943 12.848 0.21 0
9/6/2022 241.691 0.307 5.076 505.569 0.654 4.013 0 4/7/2022 7751.294 9.369 21.493 0.25 0
9/7/2022 190.037 0.354 5.440 449.703 0.749 4.317 0.01 4/8/2022 7000.725 8.355 18.804 0 0
9/8/2022 182.211 0.372 4.852 443.591 0.642 3.912 0 4/9/2022 6041.826 7.017 13.864 0 0
9/9/2022 180.567 0.332 5.309 426.468 0.702 4.143 0 4/10/2022 5473.970 6.521 13.216 0 0
9/10/2022 169.443 0.373 5.192 428.528 0.686 4.058 0 4/11/2022 5257.193 7.976 15.138 0.13 0
9/11/2022 98.925 0.532 6.704 397.027 0.919 4.930 0.03 4/12/2022 7299.038 9.109 16.993 0.14 0
9/12/2022 336.528 0.958 8.256 552.252 1.290 5.735 0.28 4/13/2022 6134.522 7.267 14.479 0.05 0
9/13/2022 356.909 0.736 6.372 589.969 0.876 4.687 0.14 4/14/2022 3692.282 6.917 14.240 0 0
9/14/2022 112.265 0.350 5.193 258.683 0.696 4.002 0 ‐‐‐ --- --- --- --- ---
--- --- --- --- --- --- --- 3.17 --- --- --- --- 1.97 2.9
MGD CFS MGD CFS MGD CFS
Wet 1.838 2.844 Wet 1.885 2.917 Wet 9.352 14.470
Dry 0.958 1.482 Dry 1.290 1.996 Dry 10.438 16.150
`
Page 1236 of 1493
Page 1237
TECsmith
TECSMITH, Inc.
PO Box 95
Clarence, NY 14031
Tel: 716-462-0382
Date: September 15, 2022
SANITARY SEWER FLOW CAPACITY STUDY – Summary Review
Prepared For: 1130 Orchard Park Road Capacity Analysis
R. Christopher Wood, PE Partner
487 Main Street, Suite 500
Buffalo, New York 14203
Project Name: 1130 Orchard Park Road Capacity Analysis
Flow Monitoring Period: August 16, 2022 to September 14, 2022
Rain Events (> 0.5-inches) Monitored: August 30 (0.97”), and September 5 (0.72”)
Number of Monitoring Nodes: Two (2) downstream manholes
Node Locations and Descriptions:
• Node 1 1001 Orchard Park Rd (12”)
• Node 2 Orchard Park Rd 15" (15”)
Summary Conclusion:
Based on the data presented in this report, specifically the flow depth measurements recorded
(see graphs below)
• One time the flow depth exceeds pipe diameter at all nodes of the downstream
monitoring points during the wet weather events monitored.
water and wastewater monitoring specialists
Page 1237 of 1493
Page 1238
7(&smith
7(&60,7+,QF
32%R[
(OPD1HZ<RUN
7HO
)D[
'DWH$SULO
6$1,7$5<6(:(5)/2:&$3$&,7<678'<±6XPPDU\5HYLHZ
3UHSDUHG)RU2UFKDUG3DUN5RDG&DSDFLW\$QDO\VLV
5&KULVWRSKHU:RRG3(3DUWQHU
0DLQ6WUHHW6XLWH
%XIIDOR1HZ<RUN
3URMHFW1DPH2UFKDUG3DUN5RDG&DSDFLW\$QDO\VLV
)ORZ0RQLWRULQJ3HULRG0DUFKWR$SULO
5DLQ(YHQWV !LQFKHV 0RQLWRUHG0DUFK ´
1XPEHURI0RQLWRULQJ1RGHV7KUHH GRZQVWUHDPPDQKROHV
1RGH/RFDWLRQVDQG'HVFULSWLRQV
x 1RGH0DUWKD 3DUN 5G
2UFKDUG
x 1RGH :DUQHU
2UFKDUG 3DUN 5G
x 1RGH 7UDQVLW5RDG
2UFKDUG 3DUN 5G
)DLUID[
6XPPDU\&RQFOXVLRQ
%DVHGRQWKHGDWDSUHVHQWHGLQWKLVUHSRUWVSHFLILFDOO\WKHIORZGHSWKPHDVXUHPHQWVUHFRUGHG
VHHJUDSKVEHORZ
x 2QHWLPHWKHIORZGHSWKH[FHHGVSLSHGLDPHWHUDW1RGHRIWKHGRZQVWUHDPPRQLWRULQJ
SRLQWVGXULQJWKHZHWZHDWKHUHYHQWVPRQLWRUHG
x 7ZRWLPHVWKHIORZGHSWKH[FHHGVSLSHGLDPHWHUDW1RGHRIWKHGRZQVWUHDPPRQLWRULQJ
SRLQWVGXULQJWKHZHWZHDWKHUHYHQWVPRQLWRUHG
x $WQRWLPHWKHIORZGHSWKH[FHHGVSLSHGLDPHWHUDW1RGHRIWKHGRZQVWUHDPPRQLWRULQJ
SRLQWVGXULQJWKHZHWZHDWKHUHYHQWVPRQLWRUHG
water and wastewater monitoring specialists
Page 1238 of 1493
Page 1239
TECsmith
TECSMITH, Inc.
PO Box 95
Clarence, NY 14031
Tel: 716-462-0382
Depth of Flow Capacity Summary:
Depth of flow capacity is based on diameter of pipe. See graphs below.
• One time during the monitoring period did depth of flow exceed pipe diameter at Node 1.
Node 1
35
30
25
Level and Pipe Size
20
15
10
5
0
17-Aug-22
18-Aug-22
19-Aug-22
20-Aug-22
20-Aug-22
21-Aug-22
22-Aug-22
23-Aug-22
24-Aug-22
25-Aug-22
25-Aug-22
26-Aug-22
27-Aug-22
28-Aug-22
29-Aug-22
30-Aug-22
30-Aug-22
31-Aug-22
1-Sep-22
2-Sep-22
3-Sep-22
4-Sep-22
4-Sep-22
5-Sep-22
6-Sep-22
7-Sep-22
8-Sep-22
9-Sep-22
9-Sep-22
10-Sep-22
11-Sep-22
12-Sep-22
13-Sep-22
14-Sep-22
Level Pipe Size (in.)
water and wastewater monitoring specialists
Page 1239 of 1493
Page 1240
•
Level and Pipe Size
10
20
30
40
50
60
70
0
17-Aug-22
18-Aug-22
19-Aug-22
19-Aug-22
TECsmith
20-Aug-22
21-Aug-22
22-Aug-22
22-Aug-22
23-Aug-22
24-Aug-22
25-Aug-22
26-Aug-22
26-Aug-22
27-Aug-22
28-Aug-22
Level
29-Aug-22
29-Aug-22
30-Aug-22
Node 2
31-Aug-22
1-Sep-22
2-Sep-22
Pipe Size
2-Sep-22
3-Sep-22
water and wastewater monitoring specialists
4-Sep-22
5-Sep-22
6-Sep-22
6-Sep-22
7-Sep-22
8-Sep-22
9-Sep-22
9-Sep-22
10-Sep-22
11-Sep-22
One time during the monitoring period did depth of flow exceed pipe diameter at Node 2.
12-Sep-22
13-Sep-22
13-Sep-22
PO Box 95
Clarence, NY 14031
TECSMITH, Inc.
Tel: 716-462-0382
Page 1240 of 1493
Page 1241
>ĞǀĞůĂŶĚWŝƉĞ^ŝnjĞ
ϭϬ
ϮϬ
ϯϬ
ϰϬ
ϱϬ
ϲϬ
Ϭ
ϭϳͲDĂƌͲϮϮ
ϭϴͲDĂƌͲϮϮ
ϭϵͲDĂƌͲϮϮ
ϭϵͲDĂƌͲϮϮ
ϮϬͲDĂƌͲϮϮ
7(&smith
ϮϭͲDĂƌͲϮϮ
ϮϮͲDĂƌͲϮϮ
ϮϮͲDĂƌͲϮϮ
ϮϯͲDĂƌͲϮϮ
ϮϰͲDĂƌͲϮϮ
ϮϱͲDĂƌͲϮϮ
ϮϱͲDĂƌͲϮϮ
ϮϲͲDĂƌͲϮϮ
ϮϳͲDĂƌͲϮϮ
ϮϴͲDĂƌͲϮϮ
ϮϵͲDĂƌͲϮϮ
>ĞǀĞů
ϮϵͲDĂƌͲϮϮ
ϯϬͲDĂƌͲϮϮ
ϯϭͲDĂƌͲϮϮ
EŽĚĞϯ
ϭͲƉƌͲϮϮ
ϭͲƉƌͲϮϮ
WŝƉĞ^ŝnjĞ
ϮͲƉƌͲϮϮ
ϯͲƉƌͲϮϮ
ϰͲƉƌͲϮϮ
water and wastewater monitoring specialists
ϰͲƉƌͲϮϮ
ϱͲƉƌͲϮϮ
ϲͲƉƌͲϮϮ
ϳͲƉƌͲϮϮ
ϴͲƉƌͲϮϮ
ϴͲƉƌͲϮϮ
ϵͲƉƌͲϮϮ
ϭϬͲƉƌͲϮϮ
ϭϭͲƉƌͲϮϮ
ϭϭͲƉƌͲϮϮ
x $WQRWLPHGXULQJWKHPRQLWRULQJSHULRGGLGGHSWKRIIORZH[FHHGSLSHGLDPHWHUDW1RGH
ϭϮͲƉƌͲϮϮ
ϭϯͲƉƌͲϮϮ
ϭϰͲƉƌͲϮϮ
(OPD1HZ<RUN
7HO
7(&60,7+,QF
)D[
32%R[
Page 1241 of 1493
Page 1242
Sewer Node Maps
Page 1242 of 1493
Page 1243
Page 1243 of 1493
Page 1244
Page 1244 of 1493
Page 1245
Page 1245 of 1493
Page 1246
Appendix D
Storm Water Calculations
Page 1246 of 1493
Page 1247
Calculate Water Quality Volume
Is this project subject to Section 4.3 of the NYS Design Manual for Enhanced Phosphorus
Removal? No
What is the nature of this construction project? New Construction
Design Point: 1
Enter 90% Rainfall Event as P
P= 1.00 inches
Calculate Required WQv
Contributing Percent
Drainage Area Impervious Area WQv SMP
Area Impervious Rv
Number (Acres) (cf) Description
(Acres) %
Filtration
1 3.66 1.89 52 0.51 6,839
Bioretention
Filtration
2 2.16 1.07 50 0.50 3,888
Bioretention
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Total 5.82 2.96 51 0.51 10727 Required WQv
Page 1247 of 1493
Page 1248
Calcuate Minimum RRv Required
Enter the Soils Data for the site
Hydrologic Soil
Acres S
Group
A 55%
B 40%
C 30%
D 2.96 20%
Total Area 2.96
Calculate the Minimum RRv
S= 0.20
Impervious = 2.96 acres
Precipitation 1.00 inches
Rv 0.95
Minimum RRv 0.047 af
2047 cf
Page 1248 of 1493
Page 1249
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
1 3.66 1.89 52 0.51 6,839 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) >2
Enter depth to bedrock (ft) >2
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 15
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 2850 sf
Enter Provided Filter Area Af 2855 sf
Recalculated Water Quality Volume (based on
WQv calc 6852 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 2,741 cf
This is the portion of the WQv that is not reduced in
WQv Treated 4098 cf
the practice.
Page 1249 of 1493
Page 1250
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
2 2.16 1.07 50 0.50 3,888 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) >2
Enter depth to bedrock (ft) >2
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 15
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 1620 sf
Enter Provided Filter Area Af 1705 sf
Recalculated Water Quality Volume (based on
WQv calc 4092 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 1,637 cf
This is the portion of the WQv that is not reduced in
WQv Treated 2251 cf
the practice.
Page 1250 of 1493
Page 1251
Filtration Bioretention (F-5)
Total Area 5.82 acres
Total Impervious 3 acres
Total RRv Provided 4,378 cf
Total WQv Provided 6,349 cf
Page 1251 of 1493
Page 1252
Project Name: Multifamily Development - 1425 & 1475 Orchard Park Rd
Job Number: 23-4121
Re: Storm Sewer Pipe Sizing Calculations
Calculated By: AJP Date: 06/17/26
STORM SEWER PIPE SIZING CALCULATIONS
INLET & TRIBUTARY RUNOFF INLET TIME OF INTENSITY RUNOFF Q PIPE DESIGN PIPE FLOW
STORM SEWER AREA (A) COEFF. TIME CONCEN. i (10-yr) DIRECT SUM DIA S V Q L TIME
LOCATION (sq ft) (acres) C (min) (total-min) (in/hr) (cfs) (cfs) (in) (ft/ft) n (fps) (cfs) (ft) (min)
YD 4 1933 0.04 0.20 21.5 21.5 2.90 0.03 0.03
to 6 0.0050 0.013 2.03 0.40 130 1.1
YD 5 8896 0.20 0.61 21.5 22.5 2.90 0.36 0.39
to 6 0.0050 0.013 2.03 0.40 52 0.4
CB 2
YD 1 8274 0.19 0.20 14.0 14.0 3.60 0.14 0.14
to 6 0.0050 0.013 2.03 0.40 66 0.5
YD 2 8696 0.20 0.50 15.2 15.2 3.40 0.34 0.47
to 8 0.0080 0.013 3.10 1.08 70 0.4
YD 3 749 0.02 0.20 2.1 15.6 3.40 0.01 0.48
to 8 0.0080 0.013 3.10 1.08 149 0.8
CB 3
CB 6 10135 0.23 0.60 9.6 9.6 4.30 0.60 0.60
to 8 0.0050 0.013 2.45 0.86 126 0.9
CB 5 14271 0.33 0.79 6.7 10.5 4.10 1.06 1.67
to 12 0.0050 0.013 3.22 2.52 51 0.3
YD 7 6970 0.16 0.57 9.8 10.7 4.10 0.37 2.04
to 12 0.0050 0.013 3.22 2.52 71 0.4
CB 4
CB 7 8721 0.20 0.65 14.4 14.4 3.50 0.45 0.45
to 12 0.0030 0.013 2.49 1.96 82 0.5
CB 8 21631 0.50 0.82 9.6 16.4 3.30 1.34 2.27
to 12 0.0050 0.013 3.22 2.52 63 0.3
STM MH 1
CB 1 8357 0.19 0.55 12.6 12.6 3.80 0.40 0.40
to 8 0.0070 0.013 2.90 1.01 100 0.6
CB 2 10541 0.24 0.75 6.5 23.0 2.90 0.53 1.32
to 12 0.0070 0.013 3.81 2.99 132 0.6
CB 3 13150 0.30 0.51 20.8 23.5 2.80 0.43 2.23
to 12 0.0100 0.013 4.55 3.57 148 0.5
CB 4 14499 0.33 0.65 8.4 24.1 2.80 0.60 4.87
to 15 0.0100 0.013 5.28 6.47 131 0.4
STM MH 1 24.5 2.80 0.00 7.15
to 18 0.0100 0.013 5.96 10.53 121 0.3
Bioretention #1
YD 8 4185 0.10 0.20 10.2 10.2 4.20 0.08 0.08
to 8 0.0050 0.013 2.45 0.86 63 0.4
23-4121 Storm Pipe Sizing Spreadsheet.xls 1 6/18/2026
Page 1252 of 1493
Page 1253
Project Name: Multifamily Development - 1425 & 1475 Orchard Park Rd
Job Number: 23-4121
Re: Storm Sewer Pipe Sizing Calculations
Calculated By: AJP Date: 06/17/26
STORM SEWER PIPE SIZING CALCULATIONS
INLET & TRIBUTARY RUNOFF INLET TIME OF INTENSITY RUNOFF Q PIPE DESIGN PIPE FLOW
STORM SEWER AREA (A) COEFF. TIME CONCEN. i (10-yr) DIRECT SUM DIA S V Q L TIME
LOCATION (sq ft) (acres) C (min) (total-min) (in/hr) (cfs) (cfs) (in) (ft/ft) n (fps) (cfs) (ft) (min)
YD 9 3540 0.08 0.20 14.3 14.3 3.60 0.06 0.14
to 8 0.0050 0.013 2.45 0.86 73 0.5
YD 10 8114 0.19 0.66 10.2 14.8 3.50 0.43 0.57
to 8 0.0050 0.013 2.45 0.86 85 0.6
YD 11 2896 0.07 0.20 16.5 16.5 3.30 0.04 0.62
to 8 0.0050 0.013 2.45 0.86 36 0.2
CB 9 3540 0.08 0.73 14.3 16.8 3.30 0.20 0.81
to 12 0.0080 0.013 4.07 3.19 209 0.9
CB 10 25464 0.58 0.61 13.2 17.6 3.20 1.14 1.96
to 12 0.0110 0.013 4.77 3.74 123 0.4
CB 11 12587 0.29 0.79 4.4 18.0 3.20 0.73 2.68
to 12 0.0110 0.013 4.77 3.74 121 0.4
Bioretention #2
23-4121 Storm Pipe Sizing Spreadsheet.xls 2 6/18/2026
Page 1253 of 1493
Page 1254
Page 1254 of 1493
Page 1255
1S
Existing - North
2S
Existing - South
Subcat Reach Pond Link Routing Diagram for 23-4121 storm calcs - Existing
Prepared by Carmina Wood Design, Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC
Page 1255 of 1493
Page 1256
23-4121 storm calcs - Existing
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-Year Type II 24-hr Default 24.00 1 1.87 2
2 10-Year Type II 24-hr Default 24.00 1 3.14 2
3 25-Year Type II 24-hr Default 24.00 1 3.84 2
4 100-Year Type II 24-hr Default 24.00 1 5.23 2
Page 1256 of 1493
Page 1257
23-4121 storm calcs - Existing
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (all nodes)
Area CN Description
(sq-ft) (subcatchment-numbers)
225,751 80 Pasture/grassland/range, Good, HSG D (1S, 2S)
49,422 79 Woods/grass comb., Good, HSG D (1S)
275,173 80 TOTAL AREA
Page 1257 of 1493
Page 1258
23-4121 storm calcs - Existing
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (all nodes)
Area Soil Subcatchment
(sq-ft) Group Numbers
0 HSG A
0 HSG B
0 HSG C
275,173 HSG D 1S, 2S
0 Other
275,173 TOTAL AREA
Page 1258 of 1493
Page 1259
23-4121 storm calcs - Existing
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 5
Ground Covers (all nodes)
HSG-A HSG-B HSG-C HSG-D Other Total Ground
(sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) Cover
0 0 0 225,751 0 225,751 Pasture/grasslan
d/range, Good
0 0 0 49,422 0 49,422 Woods/grass
comb., Good
0 0 0 275,173 0 275,173 TOTAL AREA
Page 1259 of 1493
Page 1260
23-4121 storm calcs - Existing Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 6
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing - North Runoff Area=181,234 sf 0.00% Impervious Runoff Depth=0.48"
Flow Length=806' Tc=28.2 min CN=80 Runoff=1.59 cfs 7,325 cf
Subcatchment 2S: Existing - South Runoff Area=93,939 sf 0.00% Impervious Runoff Depth=0.48"
Flow Length=362' Slope=0.0370 '/' Tc=20.1 min CN=80 Runoff=1.04 cfs 3,797 cf
Total Runoff Area = 275,173 sf Runoff Volume = 11,121 cf Average Runoff Depth = 0.48"
100.00% Pervious = 275,173 sf 0.00% Impervious = 0 sf
Page 1260 of 1493
Page 1261
23-4121 storm calcs - Existing Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment 1S: Existing - North
Runoff = 1.59 cfs @ 12.25 hrs, Volume= 7,325 cf, Depth= 0.48"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
131,812 80 Pasture/grassland/range, Good, HSG D
49,422 79 Woods/grass comb., Good, HSG D
181,234 80 Weighted Average
181,234 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
16.9 150 0.0400 0.15 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
5.2 287 0.0170 0.91 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
4.0 284 0.0280 1.17 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
2.1 85 0.0180 0.67 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
28.2 806 Total
Subcatchment 1S: Existing - North
Hydrograph
Runoff
1.59 cfs
Type II 24-hr
1-Year Rainfall=1.87"
Runoff Area=181,234 sf
Runoff Volume=7,325 cf
Flow (cfs)
1
Runoff Depth=0.48"
Flow Length=806'
Tc=28.2 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1261 of 1493
Page 1262
23-4121 storm calcs - Existing Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment 2S: Existing - South
Runoff = 1.04 cfs @ 12.15 hrs, Volume= 3,797 cf, Depth= 0.48"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
93,939 80 Pasture/grassland/range, Good, HSG D
93,939 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
17.5 150 0.0370 0.14 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
2.6 212 0.0370 1.35 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
20.1 362 Total
Subcatchment 2S: Existing - South
Hydrograph
Runoff
1.04 cfs
1 Type II 24-hr
1-Year Rainfall=1.87"
Runoff Area=93,939 sf
Runoff Volume=3,797 cf
Flow (cfs)
Runoff Depth=0.48"
Flow Length=362'
Slope=0.0370 '/'
Tc=20.1 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1262 of 1493
Page 1263
23-4121 storm calcs - Existing Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 9
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing - North Runoff Area=181,234 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=806' Tc=28.2 min CN=80 Runoff=4.98 cfs 20,479 cf
Subcatchment 2S: Existing - South Runoff Area=93,939 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=362' Slope=0.0370 '/' Tc=20.1 min CN=80 Runoff=3.19 cfs 10,615 cf
Total Runoff Area = 275,173 sf Runoff Volume = 31,093 cf Average Runoff Depth = 1.36"
100.00% Pervious = 275,173 sf 0.00% Impervious = 0 sf
Page 1263 of 1493
Page 1264
23-4121 storm calcs - Existing Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment 1S: Existing - North
Runoff = 4.98 cfs @ 12.23 hrs, Volume= 20,479 cf, Depth= 1.36"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
131,812 80 Pasture/grassland/range, Good, HSG D
49,422 79 Woods/grass comb., Good, HSG D
181,234 80 Weighted Average
181,234 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
16.9 150 0.0400 0.15 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
5.2 287 0.0170 0.91 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
4.0 284 0.0280 1.17 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
2.1 85 0.0180 0.67 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
28.2 806 Total
Subcatchment 1S: Existing - North
Hydrograph
Runoff
4.98 cfs
5
Type II 24-hr
10-Year Rainfall=3.14"
4 Runoff Area=181,234 sf
Runoff Volume=20,479 cf
Flow (cfs)
3 Runoff Depth=1.36"
Flow Length=806'
2
Tc=28.2 min
CN=80
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1264 of 1493
Page 1265
23-4121 storm calcs - Existing Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment 2S: Existing - South
Runoff = 3.19 cfs @ 12.13 hrs, Volume= 10,615 cf, Depth= 1.36"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
93,939 80 Pasture/grassland/range, Good, HSG D
93,939 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
17.5 150 0.0370 0.14 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
2.6 212 0.0370 1.35 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
20.1 362 Total
Subcatchment 2S: Existing - South
Hydrograph
Runoff
3.19 cfs
3
Type II 24-hr
10-Year Rainfall=3.14"
Runoff Area=93,939 sf
Runoff Volume=10,615 cf
Flow (cfs)
2
Runoff Depth=1.36"
Flow Length=362'
Slope=0.0370 '/'
1 Tc=20.1 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1265 of 1493
Page 1266
23-4121 storm calcs - Existing Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 12
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing - North Runoff Area=181,234 sf 0.00% Impervious Runoff Depth=1.91"
Flow Length=806' Tc=28.2 min CN=80 Runoff=7.12 cfs 28,850 cf
Subcatchment 2S: Existing - South Runoff Area=93,939 sf 0.00% Impervious Runoff Depth=1.91"
Flow Length=362' Slope=0.0370 '/' Tc=20.1 min CN=80 Runoff=4.54 cfs 14,954 cf
Total Runoff Area = 275,173 sf Runoff Volume = 43,803 cf Average Runoff Depth = 1.91"
100.00% Pervious = 275,173 sf 0.00% Impervious = 0 sf
Page 1266 of 1493
Page 1267
23-4121 storm calcs - Existing Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 13
Summary for Subcatchment 1S: Existing - North
Runoff = 7.12 cfs @ 12.23 hrs, Volume= 28,850 cf, Depth= 1.91"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
131,812 80 Pasture/grassland/range, Good, HSG D
49,422 79 Woods/grass comb., Good, HSG D
181,234 80 Weighted Average
181,234 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
16.9 150 0.0400 0.15 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
5.2 287 0.0170 0.91 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
4.0 284 0.0280 1.17 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
2.1 85 0.0180 0.67 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
28.2 806 Total
Subcatchment 1S: Existing - North
Hydrograph
Runoff
7.12 cfs
7 Type II 24-hr
25-Year Rainfall=3.84"
6
Runoff Area=181,234 sf
5 Runoff Volume=28,850 cf
Flow (cfs)
Runoff Depth=1.91"
4
Flow Length=806'
3 Tc=28.2 min
CN=80
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1267 of 1493
Page 1268
23-4121 storm calcs - Existing Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 14
Summary for Subcatchment 2S: Existing - South
Runoff = 4.54 cfs @ 12.13 hrs, Volume= 14,954 cf, Depth= 1.91"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
93,939 80 Pasture/grassland/range, Good, HSG D
93,939 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
17.5 150 0.0370 0.14 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
2.6 212 0.0370 1.35 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
20.1 362 Total
Subcatchment 2S: Existing - South
Hydrograph
5 Runoff
4.54 cfs
Type II 24-hr
4 25-Year Rainfall=3.84"
Runoff Area=93,939 sf
Runoff Volume=14,954 cf
3
Flow (cfs)
Runoff Depth=1.91"
Flow Length=362'
2
Slope=0.0370 '/'
Tc=20.1 min
1 CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1268 of 1493
Page 1269
23-4121 storm calcs - Existing Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 15
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Existing - North Runoff Area=181,234 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=806' Tc=28.2 min CN=80 Runoff=11.60 cfs 46,735 cf
Subcatchment 2S: Existing - South Runoff Area=93,939 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=362' Slope=0.0370 '/' Tc=20.1 min CN=80 Runoff=7.37 cfs 24,224 cf
Total Runoff Area = 275,173 sf Runoff Volume = 70,959 cf Average Runoff Depth = 3.09"
100.00% Pervious = 275,173 sf 0.00% Impervious = 0 sf
Page 1269 of 1493
Page 1270
23-4121 storm calcs - Existing Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 16
Summary for Subcatchment 1S: Existing - North
Runoff = 11.60 cfs @ 12.22 hrs, Volume= 46,735 cf, Depth= 3.09"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
131,812 80 Pasture/grassland/range, Good, HSG D
49,422 79 Woods/grass comb., Good, HSG D
181,234 80 Weighted Average
181,234 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
16.9 150 0.0400 0.15 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
5.2 287 0.0170 0.91 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
4.0 284 0.0280 1.17 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
2.1 85 0.0180 0.67 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
28.2 806 Total
Subcatchment 1S: Existing - North
Hydrograph
Runoff
11.60 cfs
12
11
Type II 24-hr
10
100-Year Rainfall=5.23"
9 Runoff Area=181,234 sf
8 Runoff Volume=46,735 cf
Flow (cfs)
7 Runoff Depth=3.09"
6 Flow Length=806'
5 Tc=28.2 min
4 CN=80
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1270 of 1493
Page 1271
23-4121 storm calcs - Existing Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 5/14/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 17
Summary for Subcatchment 2S: Existing - South
Runoff = 7.37 cfs @ 12.13 hrs, Volume= 24,224 cf, Depth= 3.09"
Routed to nonexistent node 6L
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
93,939 80 Pasture/grassland/range, Good, HSG D
93,939 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
17.5 150 0.0370 0.14 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
2.6 212 0.0370 1.35 Shallow Concentrated Flow,
Short Grass Pasture Kv= 7.0 fps
20.1 362 Total
Subcatchment 2S: Existing - South
Hydrograph
8 Runoff
7.37 cfs
7
Type II 24-hr
100-Year Rainfall=5.23"
6
Runoff Area=93,939 sf
5
Runoff Volume=24,224 cf
Flow (cfs)
Runoff Depth=3.09"
4
Flow Length=362'
3 Slope=0.0370 '/'
Tc=20.1 min
2
CN=80
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1271 of 1493
Page 1272
Page 1272 of 1493
Page 1273
1S 1P
Proposed - North Bioretention #1
3P
2S 2P Detention Pond
3L
Proposed - South Bioretention #2
Proposed - Total
3S
Direct
Subcat Reach Pond Link Routing Diagram for 23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design, Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC
Page 1273 of 1493
Page 1274
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-Year Type II 24-hr Default 24.00 1 1.87 2
2 10-Year Type II 24-hr Default 24.00 1 3.14 2
3 25-Year Type II 24-hr Default 24.00 1 3.84 2
4 100-Year Type II 24-hr Default 24.00 1 5.23 2
Page 1274 of 1493
Page 1275
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (all nodes)
Area CN Description
(sq-ft) (subcatchment-numbers)
146,543 80 >75% Grass cover, Good, HSG D (1S, 2S, 3S)
1,626 98 Concrete, HSG D (2S)
67,908 98 Paved parking, HSG D (1S, 2S)
55,578 98 Roofs, HSG D (1S, 2S)
3,518 98 Sidewalk, HSG D (1S)
275,173 88 TOTAL AREA
Page 1275 of 1493
Page 1276
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (all nodes)
Area Soil Subcatchment
(sq-ft) Group Numbers
0 HSG A
0 HSG B
0 HSG C
275,173 HSG D 1S, 2S, 3S
0 Other
275,173 TOTAL AREA
Page 1276 of 1493
Page 1277
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 5
Ground Covers (all nodes)
HSG-A HSG-B HSG-C HSG-D Other Total Ground Su
(sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) Cover Nu
0 0 0 146,543 0 146,543 >75% Grass
cover, Good
0 0 0 1,626 0 1,626 Concrete
0 0 0 67,908 0 67,908 Paved parking
0 0 0 55,578 0 55,578 Roofs
0 0 0 3,518 0 3,518 Sidewalk
0 0 0 275,173 0 275,173 TOTAL AREA
Page 1277 of 1493
Page 1278
23-4121 storm calcs - Proposed
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 6
Pipe Listing (all nodes)
Line# Node In-Invert Out-Invert Length Slope n Width Diam/Height Inside-Fill Node
Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) Name
1 1S 0.00 0.00 182.0 0.0050 0.013 0.0 6.0 0.0
2 1S 0.00 0.00 70.0 0.0070 0.013 0.0 12.0 0.0
3 1S 0.00 0.00 400.0 0.0100 0.013 0.0 12.0 0.0
4 2S 0.00 0.00 194.0 0.0050 0.013 0.0 8.0 0.0
5 2S 0.00 0.00 209.0 0.0080 0.013 0.0 12.0 0.0
6 2S 0.00 0.00 171.0 0.0110 0.013 0.0 12.0 0.0
7 1P 669.67 669.57 31.0 0.0032 0.013 0.0 6.0 0.0
8 2P 669.67 669.57 31.0 0.0032 0.013 0.0 6.0 0.0
9 3P 669.00 668.92 17.0 0.0047 0.013 0.0 8.0 0.0
10 3P 668.92 668.80 25.0 0.0048 0.013 0.0 8.0 0.0
Page 1278 of 1493
Page 1279
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 7
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=0.92"
Flow Length=738' Tc=24.8 min CN=89 Runoff=3.28 cfs 12,245 cf
Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=0.92"
Flow Length=627' Tc=19.8 min CN=89 Runoff=2.21 cfs 7,211 cf
Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=0.48"
Flow Length=58' Tc=7.8 min CN=80 Runoff=0.38 cfs 878 cf
Pond 1P: Bioretention #1 Peak Elev=673.76' Storage=2,122 cf Inflow=3.28 cfs 12,245 cf
Primary=2.90 cfs 10,904 cf Secondary=0.00 cfs 0 cf Outflow=2.90 cfs 10,904 cf
Pond 2P: Bioretention #2 Peak Elev=673.72' Storage=1,182 cf Inflow=2.21 cfs 7,211 cf
Primary=2.14 cfs 6,420 cf Secondary=0.00 cfs 0 cf Outflow=2.14 cfs 6,420 cf
Pond 3P: Detention Pond Peak Elev=670.86' Storage=4,596 cf Inflow=4.98 cfs 17,324 cf
Outflow=1.83 cfs 17,324 cf
Link 3L: Proposed - Total Inflow=1.87 cfs 18,202 cf
Primary=1.87 cfs 18,202 cf
Total Runoff Area = 275,173 sf Runoff Volume = 20,334 cf Average Runoff Depth = 0.89"
53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf
Page 1279 of 1493
Page 1280
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment 1S: Proposed - North
Runoff = 3.28 cfs @ 12.19 hrs, Volume= 12,245 cf, Depth= 0.92"
Routed to Pond 1P : Bioretention #1
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
32,787 98 Roofs, HSG D
45,906 98 Paved parking, HSG D
* 3,518 98 Sidewalk, HSG D
77,291 80 >75% Grass cover, Good, HSG D
159,502 89 Weighted Average
77,291 48.46% Pervious Area
82,211 51.54% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.4 21 0.0090 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.1 65 0.0100 0.07 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.5 182 0.0050 2.02 0.40 Pipe Channel, 6" @ 0.5%
6.0" Round Area= 0.2 sf Perim= 1.6' r= 0.13'
n= 0.013 Corrugated PE, smooth interior
0.3 70 0.0070 3.80 2.98 Pipe Channel, 12" @ 0.7%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
1.5 400 0.0100 4.54 3.56 Pipe Channel, 12" @ 1.0%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
24.8 738 Total
Page 1280 of 1493
Page 1281
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 9
Subcatchment 1S: Proposed - North
Hydrograph
Runoff
3.28 cfs
Type II 24-hr
3
1-Year Rainfall=1.87"
Runoff Area=159,502 sf
Runoff Volume=12,245 cf
Flow (cfs)
2 Runoff Depth=0.92"
Flow Length=738'
Tc=24.8 min
1
CN=89
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1281 of 1493
Page 1282
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment 2S: Proposed - South
Runoff = 2.21 cfs @ 12.13 hrs, Volume= 7,211 cf, Depth= 0.92"
Routed to Pond 2P : Bioretention #2
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
22,791 98 Roofs, HSG D
22,002 98 Paved parking, HSG D
* 1,626 98 Concrete, HSG D
47,520 80 >75% Grass cover, Good, HSG D
93,939 89 Weighted Average
47,520 50.59% Pervious Area
46,419 49.41% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.4 10 0.0900 0.12 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.6 43 0.0040 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.3 194 0.0050 2.45 0.85 Pipe Channel, 8" @ 0.5%
8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'
n= 0.013 Corrugated PE, smooth interior
0.9 209 0.0080 4.06 3.19 Pipe Channel, 12" @ 0.8%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.6 171 0.0110 4.76 3.74 Pipe Channel, 12" @ 1.1%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
19.8 627 Total
Page 1282 of 1493
Page 1283
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 11
Subcatchment 2S: Proposed - South
Hydrograph
Runoff
2.21 cfs
Type II 24-hr
2
1-Year Rainfall=1.87"
Runoff Area=93,939 sf
Runoff Volume=7,211 cf
Flow (cfs)
Runoff Depth=0.92"
Flow Length=627'
1
Tc=19.8 min
CN=89
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1283 of 1493
Page 1284
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 12
Summary for Subcatchment 3S: Direct
Runoff = 0.38 cfs @ 12.00 hrs, Volume= 878 cf, Depth= 0.48"
Routed to Link 3L : Proposed - Total
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (sf) CN Description
21,732 80 >75% Grass cover, Good, HSG D
21,732 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.4 10 0.0100 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
4.4 48 0.1200 0.18 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
7.8 58 Total
Subcatchment 3S: Direct
Hydrograph
0.42 Runoff
0.4
0.38 cfs
0.38
0.36
Type II 24-hr
0.34
0.32
1-Year Rainfall=1.87"
0.3
0.28
Runoff Area=21,732 sf
0.26
Runoff Volume=878 cf
Flow (cfs)
0.24
0.22
0.2
Runoff Depth=0.48"
0.18
0.16
Flow Length=58'
0.14
0.12
Tc=7.8 min
0.1
0.08
CN=80
0.06
0.04
0.02
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1284 of 1493
Page 1285
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 13
Summary for Pond 1P: Bioretention #1
Inflow Area = 159,502 sf, 51.54% Impervious, Inflow Depth = 0.92" for 1-Year event
Inflow = 3.28 cfs @ 12.19 hrs, Volume= 12,245 cf
Outflow = 2.90 cfs @ 12.28 hrs, Volume= 10,904 cf, Atten= 11%, Lag= 5.4 min
Primary = 2.90 cfs @ 12.28 hrs, Volume= 10,904 cf
Routed to Pond 3P : Detention Pond
Secondary = 0.00 cfs @ 0.50 hrs, Volume= 0 cf
Routed to Pond 3P : Detention Pond
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 673.76' @ 12.28 hrs Surf.Area= 3,084 sf Storage= 2,122 cf
Plug-Flow detention time= 81.0 min calculated for 10,898 cf (89% of inflow)
Center-of-Mass det. time= 26.2 min ( 874.9 - 848.7 )
Volume Invert Avail.Storage Storage Description
#1 673.00' 2,859 cf Custom Stage Data (Prismatic)Listed below (Recalc)
#2 669.67' 18 cf 6.0" Round Pipe Storage
L= 90.0'
2,876 cf Total Available Storage
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
673.00 2,435 0 0
673.50 2,855 1,323 1,323
674.00 3,290 1,536 2,859
Device Routing Invert Outlet Devices
#1 Device 2 673.50' 8.0" Horiz. Orifice/Grate X 4.00 C= 1.000
Limited to weir flow at low heads
#2 Primary 669.67' 6.0" Round Culvert X 2.00
L= 31.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 669.67' / 669.57' S= 0.0032 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.20 sf
#3 Secondary 674.00' 18.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28)
Primary OutFlow Max=2.90 cfs @ 12.28 hrs HW=673.76' (Free Discharge)
2=Culvert (Barrel Controls 2.90 cfs @ 7.39 fps)
1=Orifice/Grate (Passes 2.90 cfs of 3.67 cfs potential flow)
Secondary OutFlow Max=0.00 cfs @ 0.50 hrs HW=669.67' (Free Discharge)
3=Sharp-Crested Vee/Trap Weir ( Controls 0.00 cfs)
Page 1285 of 1493
Page 1286
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 14
Pond 1P: Bioretention #1
Hydrograph
3.28 cfs Inflow
Outflow
Primary
Inflow Area=159,502 sf Secondary
2.90 cfs
2.90 cfs Peak Elev=673.76'
3 Storage=2,122 cf
Flow (cfs)
2
1
0.00 cfs
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1286 of 1493
Page 1287
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 15
Summary for Pond 2P: Bioretention #2
Inflow Area = 93,939 sf, 49.41% Impervious, Inflow Depth = 0.92" for 1-Year event
Inflow = 2.21 cfs @ 12.13 hrs, Volume= 7,211 cf
Outflow = 2.14 cfs @ 12.17 hrs, Volume= 6,420 cf, Atten= 3%, Lag= 2.3 min
Primary = 2.14 cfs @ 12.17 hrs, Volume= 6,420 cf
Routed to Pond 3P : Detention Pond
Secondary = 0.00 cfs @ 0.50 hrs, Volume= 0 cf
Routed to Pond 3P : Detention Pond
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 673.72' @ 12.17 hrs Surf.Area= 1,833 sf Storage= 1,182 cf
Plug-Flow detention time= 79.8 min calculated for 6,416 cf (89% of inflow)
Center-of-Mass det. time= 24.9 min ( 869.0 - 844.1 )
Volume Invert Avail.Storage Storage Description
#1 673.00' 1,709 cf Custom Stage Data (Prismatic)Listed below (Recalc)
#2 669.67' 8 cf 6.0" Round Pipe Storage
L= 40.0'
1,717 cf Total Available Storage
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
673.00 1,430 0 0
673.50 1,705 784 784
674.00 1,995 925 1,709
Device Routing Invert Outlet Devices
#1 Device 2 673.50' 8.0" Horiz. Orifice/Grate X 3.00 C= 1.000
Limited to weir flow at low heads
#2 Primary 669.67' 6.0" Round Culvert X 2.00
L= 31.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 669.67' / 669.57' S= 0.0032 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.20 sf
#3 Secondary 674.00' 18.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28)
Primary OutFlow Max=2.11 cfs @ 12.17 hrs HW=673.72' (Free Discharge)
2=Culvert (Passes 2.11 cfs of 2.89 cfs potential flow)
1=Orifice/Grate (Weir Controls 2.11 cfs @ 1.53 fps)
Secondary OutFlow Max=0.00 cfs @ 0.50 hrs HW=669.67' (Free Discharge)
3=Sharp-Crested Vee/Trap Weir ( Controls 0.00 cfs)
Page 1287 of 1493
Page 1288
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 16
Pond 2P: Bioretention #2
Hydrograph
2.21 cfs Inflow
Outflow
Primary
2.14 cfs
2.14 cfs
Inflow Area=93,939 sf Secondary
Peak Elev=673.72'
2 Storage=1,182 cf
Flow (cfs)
1
0.00 cfs
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1288 of 1493
Page 1289
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 17
Summary for Pond 3P: Detention Pond
Inflow Area = 253,441 sf, 50.75% Impervious, Inflow Depth = 0.82" for 1-Year event
Inflow = 4.98 cfs @ 12.19 hrs, Volume= 17,324 cf
Outflow = 1.83 cfs @ 12.59 hrs, Volume= 17,324 cf, Atten= 63%, Lag= 23.9 min
Primary = 1.83 cfs @ 12.59 hrs, Volume= 17,324 cf
Routed to Link 3L : Proposed - Total
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 670.86' @ 12.59 hrs Surf.Area= 3,933 sf Storage= 4,596 cf
Plug-Flow detention time= 24.7 min calculated for 17,314 cf (100% of inflow)
Center-of-Mass det. time= 24.7 min ( 897.4 - 872.7 )
Volume Invert Avail.Storage Storage Description
#1 669.00' 38,878 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
669.00 0 0 0
670.00 3,130 1,565 1,565
671.00 4,065 3,598 5,163
672.00 5,060 4,563 9,725
673.00 6,110 5,585 15,310
674.00 13,125 9,618 24,928
675.00 14,775 13,950 38,878
Device Routing Invert Outlet Devices
#1 Device 3 669.00' 8.0" Round Culvert
L= 17.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 669.00' / 668.92' S= 0.0047 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 3 674.80' 24.0" x 24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Primary 668.92' 8.0" Round Culvert
L= 25.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 668.92' / 668.80' S= 0.0048 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=1.83 cfs @ 12.59 hrs HW=670.86' (Free Discharge)
3=Culvert (Passes 1.83 cfs of 1.88 cfs potential flow)
1=Culvert (Inlet Controls 1.83 cfs @ 5.24 fps)
2=Orifice/Grate ( Controls 0.00 cfs)
Page 1289 of 1493
Page 1290
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 18
Pond 3P: Detention Pond
Hydrograph
Inflow
4.98 cfs Primary
5 Inflow Area=253,441 sf
Peak Elev=670.86'
4 Storage=4,596 cf
Flow (cfs)
3
1.83 cfs
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1290 of 1493
Page 1291
23-4121 storm calcs - Proposed Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 19
Summary for Link 3L: Proposed - Total
Inflow Area = 275,173 sf, 46.75% Impervious, Inflow Depth = 0.79" for 1-Year event
Inflow = 1.87 cfs @ 12.57 hrs, Volume= 18,202 cf
Primary = 1.87 cfs @ 12.57 hrs, Volume= 18,202 cf, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Link 3L: Proposed - Total
Hydrograph
Inflow
1.87 cfs Primary
2 1.87 cfs
Inflow Area=275,173 sf
Flow (cfs)
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1291 of 1493
Page 1292
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 20
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=2.03"
Flow Length=738' Tc=24.8 min CN=89 Runoff=7.22 cfs 26,940 cf
Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=2.03"
Flow Length=627' Tc=19.8 min CN=89 Runoff=4.85 cfs 15,867 cf
Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=58' Tc=7.8 min CN=80 Runoff=1.12 cfs 2,456 cf
Pond 1P: Bioretention #1 Peak Elev=674.22' Storage=2,876 cf Inflow=7.22 cfs 26,940 cf
Primary=3.08 cfs 21,913 cf Secondary=6.13 cfs 3,688 cf Outflow=9.21 cfs 25,600 cf
Pond 2P: Bioretention #2 Peak Elev=674.14' Storage=1,717 cf Inflow=4.85 cfs 15,867 cf
Primary=3.05 cfs 14,217 cf Secondary=3.26 cfs 858 cf Outflow=6.31 cfs 15,075 cf
Pond 3P: Detention Pond Peak Elev=672.91' Storage=14,741 cf Inflow=15.52 cfs 40,675 cf
Outflow=2.80 cfs 40,675 cf
Link 3L: Proposed - Total Inflow=2.89 cfs 43,131 cf
Primary=2.89 cfs 43,131 cf
Total Runoff Area = 275,173 sf Runoff Volume = 45,263 cf Average Runoff Depth = 1.97"
53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf
Page 1292 of 1493
Page 1293
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 21
Summary for Subcatchment 1S: Proposed - North
Runoff = 7.22 cfs @ 12.18 hrs, Volume= 26,940 cf, Depth= 2.03"
Routed to Pond 1P : Bioretention #1
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
32,787 98 Roofs, HSG D
45,906 98 Paved parking, HSG D
* 3,518 98 Sidewalk, HSG D
77,291 80 >75% Grass cover, Good, HSG D
159,502 89 Weighted Average
77,291 48.46% Pervious Area
82,211 51.54% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.4 21 0.0090 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.1 65 0.0100 0.07 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.5 182 0.0050 2.02 0.40 Pipe Channel, 6" @ 0.5%
6.0" Round Area= 0.2 sf Perim= 1.6' r= 0.13'
n= 0.013 Corrugated PE, smooth interior
0.3 70 0.0070 3.80 2.98 Pipe Channel, 12" @ 0.7%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
1.5 400 0.0100 4.54 3.56 Pipe Channel, 12" @ 1.0%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
24.8 738 Total
Page 1293 of 1493
Page 1294
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 22
Subcatchment 1S: Proposed - North
Hydrograph
8 Runoff
7.22 cfs
7 Type II 24-hr
10-Year Rainfall=3.14"
6
Runoff Area=159,502 sf
5 Runoff Volume=26,940 cf
Flow (cfs)
Runoff Depth=2.03"
4
Flow Length=738'
3 Tc=24.8 min
CN=89
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1294 of 1493
Page 1295
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 23
Summary for Subcatchment 2S: Proposed - South
Runoff = 4.85 cfs @ 12.12 hrs, Volume= 15,867 cf, Depth= 2.03"
Routed to Pond 2P : Bioretention #2
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
22,791 98 Roofs, HSG D
22,002 98 Paved parking, HSG D
* 1,626 98 Concrete, HSG D
47,520 80 >75% Grass cover, Good, HSG D
93,939 89 Weighted Average
47,520 50.59% Pervious Area
46,419 49.41% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.4 10 0.0900 0.12 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.6 43 0.0040 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.3 194 0.0050 2.45 0.85 Pipe Channel, 8" @ 0.5%
8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'
n= 0.013 Corrugated PE, smooth interior
0.9 209 0.0080 4.06 3.19 Pipe Channel, 12" @ 0.8%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.6 171 0.0110 4.76 3.74 Pipe Channel, 12" @ 1.1%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
19.8 627 Total
Page 1295 of 1493
Page 1296
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 24
Subcatchment 2S: Proposed - South
Hydrograph
Runoff
4.85 cfs
5
Type II 24-hr
10-Year Rainfall=3.14"
4
Runoff Area=93,939 sf
Runoff Volume=15,867 cf
Flow (cfs)
3 Runoff Depth=2.03"
Flow Length=627'
2 Tc=19.8 min
CN=89
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1296 of 1493
Page 1297
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 25
Summary for Subcatchment 3S: Direct
Runoff = 1.12 cfs @ 12.00 hrs, Volume= 2,456 cf, Depth= 1.36"
Routed to Link 3L : Proposed - Total
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (sf) CN Description
21,732 80 >75% Grass cover, Good, HSG D
21,732 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.4 10 0.0100 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
4.4 48 0.1200 0.18 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
7.8 58 Total
Subcatchment 3S: Direct
Hydrograph
Runoff
1.12 cfs
Type II 24-hr
1
10-Year Rainfall=3.14"
Runoff Area=21,732 sf
Runoff Volume=2,456 cf
Flow (cfs)
Runoff Depth=1.36"
Flow Length=58'
Tc=7.8 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1297 of 1493
Page 1298
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 26
Summary for Pond 1P: Bioretention #1
Inflow Area = 159,502 sf, 51.54% Impervious, Inflow Depth = 2.03" for 10-Year event
Inflow = 7.22 cfs @ 12.18 hrs, Volume= 26,940 cf
Outflow = 9.21 cfs @ 12.14 hrs, Volume= 25,600 cf, Atten= 0%, Lag= 0.0 min
Primary = 3.08 cfs @ 12.14 hrs, Volume= 21,913 cf
Routed to Pond 3P : Detention Pond
Secondary = 6.13 cfs @ 12.14 hrs, Volume= 3,688 cf
Routed to Pond 3P : Detention Pond
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 674.22' @ 12.14 hrs Surf.Area= 3,290 sf Storage= 2,876 cf
Plug-Flow detention time= 47.3 min calculated for 25,586 cf (95% of inflow)
Center-of-Mass det. time= 19.0 min ( 845.2 - 826.2 )
Volume Invert Avail.Storage Storage Description
#1 673.00' 2,859 cf Custom Stage Data (Prismatic)Listed below (Recalc)
#2 669.67' 18 cf 6.0" Round Pipe Storage
L= 90.0'
2,876 cf Total Available Storage
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
673.00 2,435 0 0
673.50 2,855 1,323 1,323
674.00 3,290 1,536 2,859
Device Routing Invert Outlet Devices
#1 Device 2 673.50' 8.0" Horiz. Orifice/Grate X 4.00 C= 1.000
Limited to weir flow at low heads
#2 Primary 669.67' 6.0" Round Culvert X 2.00
L= 31.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 669.67' / 669.57' S= 0.0032 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.20 sf
#3 Secondary 674.00' 18.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28)
Primary OutFlow Max=3.08 cfs @ 12.14 hrs HW=674.22' (Free Discharge)
2=Culvert (Barrel Controls 3.08 cfs @ 7.84 fps)
1=Orifice/Grate (Passes 3.08 cfs of 9.51 cfs potential flow)
Secondary OutFlow Max=6.12 cfs @ 12.14 hrs HW=674.22' (Free Discharge)
3=Sharp-Crested Vee/Trap Weir (Weir Controls 6.12 cfs @ 1.54 fps)
Page 1298 of 1493
Page 1299
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 27
Pond 1P: Bioretention #1
Hydrograph
Inflow
Outflow
9.21 cfs Primary
Inflow Area=159,502 sf Secondary
10
7.22 cfs Peak Elev=674.22'
9
Storage=2,876 cf
8
7 6.13 cfs
6
Flow (cfs)
5
3.08 cfs
4
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1299 of 1493
Page 1300
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 28
Summary for Pond 2P: Bioretention #2
Inflow Area = 93,939 sf, 49.41% Impervious, Inflow Depth = 2.03" for 10-Year event
Inflow = 4.85 cfs @ 12.12 hrs, Volume= 15,867 cf
Outflow = 6.31 cfs @ 12.14 hrs, Volume= 15,075 cf, Atten= 0%, Lag= 1.1 min
Primary = 3.05 cfs @ 12.14 hrs, Volume= 14,217 cf
Routed to Pond 3P : Detention Pond
Secondary = 3.26 cfs @ 12.14 hrs, Volume= 858 cf
Routed to Pond 3P : Detention Pond
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 674.14' @ 12.14 hrs Surf.Area= 1,995 sf Storage= 1,717 cf
Plug-Flow detention time= 46.2 min calculated for 15,066 cf (95% of inflow)
Center-of-Mass det. time= 17.7 min ( 839.3 - 821.6 )
Volume Invert Avail.Storage Storage Description
#1 673.00' 1,709 cf Custom Stage Data (Prismatic)Listed below (Recalc)
#2 669.67' 8 cf 6.0" Round Pipe Storage
L= 40.0'
1,717 cf Total Available Storage
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
673.00 1,430 0 0
673.50 1,705 784 784
674.00 1,995 925 1,709
Device Routing Invert Outlet Devices
#1 Device 2 673.50' 8.0" Horiz. Orifice/Grate X 3.00 C= 1.000
Limited to weir flow at low heads
#2 Primary 669.67' 6.0" Round Culvert X 2.00
L= 31.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 669.67' / 669.57' S= 0.0032 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.20 sf
#3 Secondary 674.00' 18.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28)
Primary OutFlow Max=3.05 cfs @ 12.14 hrs HW=674.14' (Free Discharge)
2=Culvert (Barrel Controls 3.05 cfs @ 7.76 fps)
1=Orifice/Grate (Passes 3.05 cfs of 6.72 cfs potential flow)
Secondary OutFlow Max=3.14 cfs @ 12.14 hrs HW=674.14' (Free Discharge)
3=Sharp-Crested Vee/Trap Weir (Weir Controls 3.14 cfs @ 1.23 fps)
Page 1300 of 1493
Page 1301
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 29
Pond 2P: Bioretention #2
Hydrograph
Inflow
Outflow
6.31 cfs Primary
7 Inflow Area=93,939 sf Secondary
4.85 cfs Peak Elev=674.14'
6
Storage=1,717 cf
5
Flow (cfs)
4 3.05
3.26 cfscfs
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1301 of 1493
Page 1302
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 30
Summary for Pond 3P: Detention Pond
Inflow Area = 253,441 sf, 50.75% Impervious, Inflow Depth = 1.93" for 10-Year event
Inflow = 15.52 cfs @ 12.14 hrs, Volume= 40,675 cf
Outflow = 2.80 cfs @ 12.80 hrs, Volume= 40,675 cf, Atten= 82%, Lag= 39.7 min
Primary = 2.80 cfs @ 12.80 hrs, Volume= 40,675 cf
Routed to Link 3L : Proposed - Total
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 672.91' @ 12.80 hrs Surf.Area= 6,011 sf Storage= 14,741 cf
Plug-Flow detention time= 49.3 min calculated for 40,652 cf (100% of inflow)
Center-of-Mass det. time= 49.3 min ( 892.3 - 843.0 )
Volume Invert Avail.Storage Storage Description
#1 669.00' 38,878 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
669.00 0 0 0
670.00 3,130 1,565 1,565
671.00 4,065 3,598 5,163
672.00 5,060 4,563 9,725
673.00 6,110 5,585 15,310
674.00 13,125 9,618 24,928
675.00 14,775 13,950 38,878
Device Routing Invert Outlet Devices
#1 Device 3 669.00' 8.0" Round Culvert
L= 17.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 669.00' / 668.92' S= 0.0047 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 3 674.80' 24.0" x 24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Primary 668.92' 8.0" Round Culvert
L= 25.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 668.92' / 668.80' S= 0.0048 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=2.80 cfs @ 12.80 hrs HW=672.90' (Free Discharge)
3=Culvert (Passes 2.80 cfs of 2.83 cfs potential flow)
1=Culvert (Inlet Controls 2.80 cfs @ 8.03 fps)
2=Orifice/Grate ( Controls 0.00 cfs)
Page 1302 of 1493
Page 1303
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 31
Pond 3P: Detention Pond
Hydrograph
Inflow
17
15.52 cfs Primary
16 Inflow Area=253,441 sf
15
14 Peak Elev=672.91'
13
12
Storage=14,741 cf
11
10
Flow (cfs)
9
8
7
6
5
4 2.80 cfs
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1303 of 1493
Page 1304
23-4121 storm calcs - Proposed Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 32
Summary for Link 3L: Proposed - Total
Inflow Area = 275,173 sf, 46.75% Impervious, Inflow Depth = 1.88" for 10-Year event
Inflow = 2.89 cfs @ 12.79 hrs, Volume= 43,131 cf
Primary = 2.89 cfs @ 12.79 hrs, Volume= 43,131 cf, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Link 3L: Proposed - Total
Hydrograph
Inflow
2.89 cfs Primary
2.89 cfs
3
Inflow Area=275,173 sf
2
Flow (cfs)
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1304 of 1493
Page 1305
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 33
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=2.67"
Flow Length=738' Tc=24.8 min CN=89 Runoff=9.47 cfs 35,532 cf
Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=2.67"
Flow Length=627' Tc=19.8 min CN=89 Runoff=6.35 cfs 20,927 cf
Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=1.91"
Flow Length=58' Tc=7.8 min CN=80 Runoff=1.57 cfs 3,459 cf
Pond 1P: Bioretention #1 Peak Elev=674.23' Storage=2,876 cf Inflow=9.47 cfs 35,532 cf
Primary=3.08 cfs 27,057 cf Secondary=6.47 cfs 7,134 cf Outflow=9.55 cfs 34,192 cf
Pond 2P: Bioretention #2 Peak Elev=674.16' Storage=1,717 cf Inflow=6.35 cfs 20,927 cf
Primary=3.05 cfs 17,745 cf Secondary=3.75 cfs 2,390 cf Outflow=6.81 cfs 20,135 cf
Pond 3P: Detention Pond Peak Elev=673.66' Storage=20,871 cf Inflow=16.28 cfs 54,327 cf
Outflow=3.08 cfs 54,327 cf
Link 3L: Proposed - Total Inflow=3.23 cfs 57,786 cf
Primary=3.23 cfs 57,786 cf
Total Runoff Area = 275,173 sf Runoff Volume = 59,918 cf Average Runoff Depth = 2.61"
53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf
Page 1305 of 1493
Page 1306
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 34
Summary for Subcatchment 1S: Proposed - North
Runoff = 9.47 cfs @ 12.18 hrs, Volume= 35,532 cf, Depth= 2.67"
Routed to Pond 1P : Bioretention #1
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
32,787 98 Roofs, HSG D
45,906 98 Paved parking, HSG D
* 3,518 98 Sidewalk, HSG D
77,291 80 >75% Grass cover, Good, HSG D
159,502 89 Weighted Average
77,291 48.46% Pervious Area
82,211 51.54% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.4 21 0.0090 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.1 65 0.0100 0.07 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.5 182 0.0050 2.02 0.40 Pipe Channel, 6" @ 0.5%
6.0" Round Area= 0.2 sf Perim= 1.6' r= 0.13'
n= 0.013 Corrugated PE, smooth interior
0.3 70 0.0070 3.80 2.98 Pipe Channel, 12" @ 0.7%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
1.5 400 0.0100 4.54 3.56 Pipe Channel, 12" @ 1.0%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
24.8 738 Total
Page 1306 of 1493
Page 1307
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 35
Subcatchment 1S: Proposed - North
Hydrograph
Runoff
10 9.47 cfs
9
Type II 24-hr
25-Year Rainfall=3.84"
8
Runoff Area=159,502 sf
7
Runoff Volume=35,532 cf
Flow (cfs)
6
Runoff Depth=2.67"
5 Flow Length=738'
4 Tc=24.8 min
3 CN=89
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1307 of 1493
Page 1308
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 36
Summary for Subcatchment 2S: Proposed - South
Runoff = 6.35 cfs @ 12.12 hrs, Volume= 20,927 cf, Depth= 2.67"
Routed to Pond 2P : Bioretention #2
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
22,791 98 Roofs, HSG D
22,002 98 Paved parking, HSG D
* 1,626 98 Concrete, HSG D
47,520 80 >75% Grass cover, Good, HSG D
93,939 89 Weighted Average
47,520 50.59% Pervious Area
46,419 49.41% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.4 10 0.0900 0.12 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.6 43 0.0040 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.3 194 0.0050 2.45 0.85 Pipe Channel, 8" @ 0.5%
8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'
n= 0.013 Corrugated PE, smooth interior
0.9 209 0.0080 4.06 3.19 Pipe Channel, 12" @ 0.8%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.6 171 0.0110 4.76 3.74 Pipe Channel, 12" @ 1.1%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
19.8 627 Total
Page 1308 of 1493
Page 1309
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 37
Subcatchment 2S: Proposed - South
Hydrograph
7 Runoff
6.35 cfs
6
Type II 24-hr
25-Year Rainfall=3.84"
5 Runoff Area=93,939 sf
Runoff Volume=20,927 cf
Flow (cfs)
4
Runoff Depth=2.67"
Flow Length=627'
3
Tc=19.8 min
2 CN=89
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1309 of 1493
Page 1310
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 38
Summary for Subcatchment 3S: Direct
Runoff = 1.57 cfs @ 11.99 hrs, Volume= 3,459 cf, Depth= 1.91"
Routed to Link 3L : Proposed - Total
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (sf) CN Description
21,732 80 >75% Grass cover, Good, HSG D
21,732 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.4 10 0.0100 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
4.4 48 0.1200 0.18 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
7.8 58 Total
Subcatchment 3S: Direct
Hydrograph
Runoff
1.57 cfs
Type II 24-hr
25-Year Rainfall=3.84"
Runoff Area=21,732 sf
Runoff Volume=3,459 cf
Flow (cfs)
1
Runoff Depth=1.91"
Flow Length=58'
Tc=7.8 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1310 of 1493
Page 1311
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 39
Summary for Pond 1P: Bioretention #1
Inflow Area = 159,502 sf, 51.54% Impervious, Inflow Depth = 2.67" for 25-Year event
Inflow = 9.47 cfs @ 12.18 hrs, Volume= 35,532 cf
Outflow = 9.55 cfs @ 12.15 hrs, Volume= 34,192 cf, Atten= 0%, Lag= 0.0 min
Primary = 3.08 cfs @ 12.15 hrs, Volume= 27,057 cf
Routed to Pond 3P : Detention Pond
Secondary = 6.47 cfs @ 12.15 hrs, Volume= 7,134 cf
Routed to Pond 3P : Detention Pond
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 674.23' @ 12.15 hrs Surf.Area= 3,290 sf Storage= 2,876 cf
Plug-Flow detention time= 39.5 min calculated for 34,192 cf (96% of inflow)
Center-of-Mass det. time= 17.1 min ( 835.5 - 818.3 )
Volume Invert Avail.Storage Storage Description
#1 673.00' 2,859 cf Custom Stage Data (Prismatic)Listed below (Recalc)
#2 669.67' 18 cf 6.0" Round Pipe Storage
L= 90.0'
2,876 cf Total Available Storage
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
673.00 2,435 0 0
673.50 2,855 1,323 1,323
674.00 3,290 1,536 2,859
Device Routing Invert Outlet Devices
#1 Device 2 673.50' 8.0" Horiz. Orifice/Grate X 4.00 C= 1.000
Limited to weir flow at low heads
#2 Primary 669.67' 6.0" Round Culvert X 2.00
L= 31.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 669.67' / 669.57' S= 0.0032 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.20 sf
#3 Secondary 674.00' 18.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28)
Primary OutFlow Max=3.08 cfs @ 12.15 hrs HW=674.23' (Free Discharge)
2=Culvert (Barrel Controls 3.08 cfs @ 7.84 fps)
1=Orifice/Grate (Passes 3.08 cfs of 9.54 cfs potential flow)
Secondary OutFlow Max=6.31 cfs @ 12.15 hrs HW=674.23' (Free Discharge)
3=Sharp-Crested Vee/Trap Weir (Weir Controls 6.31 cfs @ 1.56 fps)
Page 1311 of 1493
Page 1312
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 40
Pond 1P: Bioretention #1
Hydrograph
Inflow
9.47 cfs Outflow
9.55 cfs Primary
Inflow Area=159,502 sf Secondary
10
Peak Elev=674.23'
9
Storage=2,876 cf
8
7
6.47 cfs
Flow (cfs)
6
5
3.08 cfs
4
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1312 of 1493
Page 1313
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 41
Summary for Pond 2P: Bioretention #2
Inflow Area = 93,939 sf, 49.41% Impervious, Inflow Depth = 2.67" for 25-Year event
Inflow = 6.35 cfs @ 12.12 hrs, Volume= 20,927 cf
Outflow = 6.81 cfs @ 12.14 hrs, Volume= 20,135 cf, Atten= 0%, Lag= 1.0 min
Primary = 3.05 cfs @ 12.14 hrs, Volume= 17,745 cf
Routed to Pond 3P : Detention Pond
Secondary = 3.75 cfs @ 12.14 hrs, Volume= 2,390 cf
Routed to Pond 3P : Detention Pond
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 674.16' @ 12.14 hrs Surf.Area= 1,995 sf Storage= 1,717 cf
Plug-Flow detention time= 38.5 min calculated for 20,135 cf (96% of inflow)
Center-of-Mass det. time= 16.1 min ( 829.8 - 813.7 )
Volume Invert Avail.Storage Storage Description
#1 673.00' 1,709 cf Custom Stage Data (Prismatic)Listed below (Recalc)
#2 669.67' 8 cf 6.0" Round Pipe Storage
L= 40.0'
1,717 cf Total Available Storage
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
673.00 1,430 0 0
673.50 1,705 784 784
674.00 1,995 925 1,709
Device Routing Invert Outlet Devices
#1 Device 2 673.50' 8.0" Horiz. Orifice/Grate X 3.00 C= 1.000
Limited to weir flow at low heads
#2 Primary 669.67' 6.0" Round Culvert X 2.00
L= 31.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 669.67' / 669.57' S= 0.0032 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.20 sf
#3 Secondary 674.00' 18.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28)
Primary OutFlow Max=3.05 cfs @ 12.14 hrs HW=674.16' (Free Discharge)
2=Culvert (Barrel Controls 3.05 cfs @ 7.78 fps)
1=Orifice/Grate (Passes 3.05 cfs of 6.80 cfs potential flow)
Secondary OutFlow Max=3.63 cfs @ 12.14 hrs HW=674.16' (Free Discharge)
3=Sharp-Crested Vee/Trap Weir (Weir Controls 3.63 cfs @ 1.29 fps)
Page 1313 of 1493
Page 1314
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 42
Pond 2P: Bioretention #2
Hydrograph
Inflow
Outflow
6.81 cfscfs
6.35 Primary
Inflow Area=93,939 sf Secondary
7 Peak Elev=674.16'
6
Storage=1,717 cf
5
Flow (cfs)
3.75 cfs
4 3.05 cfs
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1314 of 1493
Page 1315
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 43
Summary for Pond 3P: Detention Pond
Inflow Area = 253,441 sf, 50.75% Impervious, Inflow Depth = 2.57" for 25-Year event
Inflow = 16.28 cfs @ 12.14 hrs, Volume= 54,327 cf
Outflow = 3.08 cfs @ 12.88 hrs, Volume= 54,327 cf, Atten= 81%, Lag= 44.5 min
Primary = 3.08 cfs @ 12.88 hrs, Volume= 54,327 cf
Routed to Link 3L : Proposed - Total
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 673.66' @ 12.88 hrs Surf.Area= 10,740 sf Storage= 20,871 cf
Plug-Flow detention time= 62.2 min calculated for 54,327 cf (100% of inflow)
Center-of-Mass det. time= 62.2 min ( 895.6 - 833.4 )
Volume Invert Avail.Storage Storage Description
#1 669.00' 38,878 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
669.00 0 0 0
670.00 3,130 1,565 1,565
671.00 4,065 3,598 5,163
672.00 5,060 4,563 9,725
673.00 6,110 5,585 15,310
674.00 13,125 9,618 24,928
675.00 14,775 13,950 38,878
Device Routing Invert Outlet Devices
#1 Device 3 669.00' 8.0" Round Culvert
L= 17.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 669.00' / 668.92' S= 0.0047 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 3 674.80' 24.0" x 24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Primary 668.92' 8.0" Round Culvert
L= 25.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 668.92' / 668.80' S= 0.0048 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=3.08 cfs @ 12.88 hrs HW=673.66' (Free Discharge)
3=Culvert (Passes 3.08 cfs of 3.11 cfs potential flow)
1=Culvert (Inlet Controls 3.08 cfs @ 8.84 fps)
2=Orifice/Grate ( Controls 0.00 cfs)
Page 1315 of 1493
Page 1316
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 44
Pond 3P: Detention Pond
Hydrograph
Inflow
18 16.28 cfs Primary
17
16
Inflow Area=253,441 sf
15 Peak Elev=673.66'
14
13 Storage=20,871 cf
12
11
Flow (cfs)
10
9
8
7
6
5
4 3.08 cfs
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1316 of 1493
Page 1317
23-4121 storm calcs - Proposed Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 45
Summary for Link 3L: Proposed - Total
Inflow Area = 275,173 sf, 46.75% Impervious, Inflow Depth = 2.52" for 25-Year event
Inflow = 3.23 cfs @ 12.01 hrs, Volume= 57,786 cf
Primary = 3.23 cfs @ 12.01 hrs, Volume= 57,786 cf, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Link 3L: Proposed - Total
Hydrograph
Inflow
3.23 cfs Primary
3.23 cfs
Inflow Area=275,173 sf
3
Flow (cfs)
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1317 of 1493
Page 1318
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 46
Time span=0.50-70.00 hrs, dt=0.04 hrs, 1739 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1S: Proposed - North Runoff Area=159,502 sf 51.54% Impervious Runoff Depth=3.99"
Flow Length=738' Tc=24.8 min CN=89 Runoff=13.94 cfs 53,068 cf
Subcatchment 2S: Proposed - South Runoff Area=93,939 sf 49.41% Impervious Runoff Depth=3.99"
Flow Length=627' Tc=19.8 min CN=89 Runoff=9.33 cfs 31,254 cf
Subcatchment 3S: Direct Runoff Area=21,732 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=58' Tc=7.8 min CN=80 Runoff=2.52 cfs 5,604 cf
Pond 1P: Bioretention #1 Peak Elev=674.34' Storage=2,876 cf Inflow=13.94 cfs 53,068 cf
Primary=3.12 cfs 36,834 cf Secondary=11.94 cfs 14,893 cf Outflow=15.07 cfs 51,727 cf
Pond 2P: Bioretention #2 Peak Elev=674.24' Storage=1,717 cf Inflow=9.33 cfs 31,254 cf
Primary=3.08 cfs 24,295 cf Secondary=6.77 cfs 6,168 cf Outflow=9.85 cfs 30,463 cf
Pond 3P: Detention Pond Peak Elev=674.69' Storage=34,430 cf Inflow=24.24 cfs 82,190 cf
Outflow=3.43 cfs 82,190 cf
Link 3L: Proposed - Total Inflow=4.61 cfs 87,794 cf
Primary=4.61 cfs 87,794 cf
Total Runoff Area = 275,173 sf Runoff Volume = 89,926 cf Average Runoff Depth = 3.92"
53.25% Pervious = 146,543 sf 46.75% Impervious = 128,630 sf
Page 1318 of 1493
Page 1319
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 47
Summary for Subcatchment 1S: Proposed - North
Runoff = 13.94 cfs @ 12.17 hrs, Volume= 53,068 cf, Depth= 3.99"
Routed to Pond 1P : Bioretention #1
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
32,787 98 Roofs, HSG D
45,906 98 Paved parking, HSG D
* 3,518 98 Sidewalk, HSG D
77,291 80 >75% Grass cover, Good, HSG D
159,502 89 Weighted Average
77,291 48.46% Pervious Area
82,211 51.54% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.4 21 0.0090 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.1 65 0.0100 0.07 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.5 182 0.0050 2.02 0.40 Pipe Channel, 6" @ 0.5%
6.0" Round Area= 0.2 sf Perim= 1.6' r= 0.13'
n= 0.013 Corrugated PE, smooth interior
0.3 70 0.0070 3.80 2.98 Pipe Channel, 12" @ 0.7%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
1.5 400 0.0100 4.54 3.56 Pipe Channel, 12" @ 1.0%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
24.8 738 Total
Page 1319 of 1493
Page 1320
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 48
Subcatchment 1S: Proposed - North
Hydrograph
Runoff
15 13.94 cfs
14
Type II 24-hr
13
12
100-Year Rainfall=5.23"
11 Runoff Area=159,502 sf
10
Runoff Volume=53,068 cf
9
Flow (cfs)
8
Runoff Depth=3.99"
7 Flow Length=738'
6 Tc=24.8 min
5
CN=89
4
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1320 of 1493
Page 1321
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 49
Summary for Subcatchment 2S: Proposed - South
Runoff = 9.33 cfs @ 12.12 hrs, Volume= 31,254 cf, Depth= 3.99"
Routed to Pond 2P : Bioretention #2
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
22,791 98 Roofs, HSG D
22,002 98 Paved parking, HSG D
* 1,626 98 Concrete, HSG D
47,520 80 >75% Grass cover, Good, HSG D
93,939 89 Weighted Average
47,520 50.59% Pervious Area
46,419 49.41% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.4 10 0.0900 0.12 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
15.6 43 0.0040 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
1.3 194 0.0050 2.45 0.85 Pipe Channel, 8" @ 0.5%
8.0" Round Area= 0.3 sf Perim= 2.1' r= 0.17'
n= 0.013 Corrugated PE, smooth interior
0.9 209 0.0080 4.06 3.19 Pipe Channel, 12" @ 0.8%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.6 171 0.0110 4.76 3.74 Pipe Channel, 12" @ 1.1%
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
19.8 627 Total
Page 1321 of 1493
Page 1322
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 50
Subcatchment 2S: Proposed - South
Hydrograph
Runoff
10 9.33 cfs
9 Type II 24-hr
8
100-Year Rainfall=5.23"
Runoff Area=93,939 sf
7
Runoff Volume=31,254 cf
6
Flow (cfs)
Runoff Depth=3.99"
5
Flow Length=627'
4 Tc=19.8 min
3 CN=89
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1322 of 1493
Page 1323
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 51
Summary for Subcatchment 3S: Direct
Runoff = 2.52 cfs @ 11.99 hrs, Volume= 5,604 cf, Depth= 3.09"
Routed to Link 3L : Proposed - Total
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (sf) CN Description
21,732 80 >75% Grass cover, Good, HSG D
21,732 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.4 10 0.0100 0.05 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
4.4 48 0.1200 0.18 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.50"
7.8 58 Total
Subcatchment 3S: Direct
Hydrograph
Runoff
2.52 cfs
Type II 24-hr
100-Year Rainfall=5.23"
2 Runoff Area=21,732 sf
Runoff Volume=5,604 cf
Flow (cfs)
Runoff Depth=3.09"
Flow Length=58'
1 Tc=7.8 min
CN=80
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1323 of 1493
Page 1324
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 52
Summary for Pond 1P: Bioretention #1
Inflow Area = 159,502 sf, 51.54% Impervious, Inflow Depth = 3.99" for 100-Year event
Inflow = 13.94 cfs @ 12.17 hrs, Volume= 53,068 cf
Outflow = 15.07 cfs @ 12.18 hrs, Volume= 51,727 cf, Atten= 0%, Lag= 0.4 min
Primary = 3.12 cfs @ 12.18 hrs, Volume= 36,834 cf
Routed to Pond 3P : Detention Pond
Secondary = 11.94 cfs @ 12.18 hrs, Volume= 14,893 cf
Routed to Pond 3P : Detention Pond
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 674.34' @ 12.18 hrs Surf.Area= 3,290 sf Storage= 2,876 cf
Plug-Flow detention time= 30.0 min calculated for 51,698 cf (97% of inflow)
Center-of-Mass det. time= 14.5 min ( 821.6 - 807.1 )
Volume Invert Avail.Storage Storage Description
#1 673.00' 2,859 cf Custom Stage Data (Prismatic)Listed below (Recalc)
#2 669.67' 18 cf 6.0" Round Pipe Storage
L= 90.0'
2,876 cf Total Available Storage
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
673.00 2,435 0 0
673.50 2,855 1,323 1,323
674.00 3,290 1,536 2,859
Device Routing Invert Outlet Devices
#1 Device 2 673.50' 8.0" Horiz. Orifice/Grate X 4.00 C= 1.000
Limited to weir flow at low heads
#2 Primary 669.67' 6.0" Round Culvert X 2.00
L= 31.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 669.67' / 669.57' S= 0.0032 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.20 sf
#3 Secondary 674.00' 18.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28)
Primary OutFlow Max=3.12 cfs @ 12.18 hrs HW=674.34' (Free Discharge)
2=Culvert (Barrel Controls 3.12 cfs @ 7.95 fps)
1=Orifice/Grate (Passes 3.12 cfs of 10.29 cfs potential flow)
Secondary OutFlow Max=11.88 cfs @ 12.18 hrs HW=674.34' (Free Discharge)
3=Sharp-Crested Vee/Trap Weir (Weir Controls 11.88 cfs @ 1.92 fps)
Page 1324 of 1493
Page 1325
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 53
Pond 1P: Bioretention #1
Hydrograph
Inflow
Outflow
15.07 cfscfs
13.94 Primary
Inflow Area=159,502 sf Secondary
16
15
Peak Elev=674.34'
14 Storage=2,876 cf
13 11.94 cfs
12
11
10
Flow (cfs)
9
8
7
6
5 3.12 cfs
4
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1325 of 1493
Page 1326
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 54
Summary for Pond 2P: Bioretention #2
Inflow Area = 93,939 sf, 49.41% Impervious, Inflow Depth = 3.99" for 100-Year event
Inflow = 9.33 cfs @ 12.12 hrs, Volume= 31,254 cf
Outflow = 9.85 cfs @ 12.10 hrs, Volume= 30,463 cf, Atten= 0%, Lag= 0.0 min
Primary = 3.08 cfs @ 12.10 hrs, Volume= 24,295 cf
Routed to Pond 3P : Detention Pond
Secondary = 6.77 cfs @ 12.10 hrs, Volume= 6,168 cf
Routed to Pond 3P : Detention Pond
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 674.24' @ 12.10 hrs Surf.Area= 1,995 sf Storage= 1,717 cf
Plug-Flow detention time= 29.3 min calculated for 30,463 cf (97% of inflow)
Center-of-Mass det. time= 13.7 min ( 816.1 - 802.4 )
Volume Invert Avail.Storage Storage Description
#1 673.00' 1,709 cf Custom Stage Data (Prismatic)Listed below (Recalc)
#2 669.67' 8 cf 6.0" Round Pipe Storage
L= 40.0'
1,717 cf Total Available Storage
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
673.00 1,430 0 0
673.50 1,705 784 784
674.00 1,995 925 1,709
Device Routing Invert Outlet Devices
#1 Device 2 673.50' 8.0" Horiz. Orifice/Grate X 3.00 C= 1.000
Limited to weir flow at low heads
#2 Primary 669.67' 6.0" Round Culvert X 2.00
L= 31.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 669.67' / 669.57' S= 0.0032 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.20 sf
#3 Secondary 674.00' 18.0' long Sharp-Crested Vee/Trap Weir Cv= 2.62 (C= 3.28)
Primary OutFlow Max=3.08 cfs @ 12.10 hrs HW=674.23' (Free Discharge)
2=Culvert (Barrel Controls 3.08 cfs @ 7.85 fps)
1=Orifice/Grate (Passes 3.08 cfs of 7.19 cfs potential flow)
Secondary OutFlow Max=6.61 cfs @ 12.10 hrs HW=674.23' (Free Discharge)
3=Sharp-Crested Vee/Trap Weir (Weir Controls 6.61 cfs @ 1.58 fps)
Page 1326 of 1493
Page 1327
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 55
Pond 2P: Bioretention #2
Hydrograph
Inflow
Outflow
9.85
9.33
cfscfs Primary
11 Inflow Area=93,939 sf Secondary
10 Peak Elev=674.24'
9 Storage=1,717 cf
8
6.77 cfs
7
Flow (cfs)
6
5
3.08 cfs
4
3
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1327 of 1493
Page 1328
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 56
Summary for Pond 3P: Detention Pond
Inflow Area = 253,441 sf, 50.75% Impervious, Inflow Depth = 3.89" for 100-Year event
Inflow = 24.24 cfs @ 12.18 hrs, Volume= 82,190 cf
Outflow = 3.43 cfs @ 13.03 hrs, Volume= 82,190 cf, Atten= 86%, Lag= 51.0 min
Primary = 3.43 cfs @ 13.03 hrs, Volume= 82,190 cf
Routed to Link 3L : Proposed - Total
Routing by Stor-Ind method, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Peak Elev= 674.69' @ 13.03 hrs Surf.Area= 14,270 sf Storage= 34,430 cf
Plug-Flow detention time= 90.9 min calculated for 82,190 cf (100% of inflow)
Center-of-Mass det. time= 90.8 min ( 910.4 - 819.6 )
Volume Invert Avail.Storage Storage Description
#1 669.00' 38,878 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
669.00 0 0 0
670.00 3,130 1,565 1,565
671.00 4,065 3,598 5,163
672.00 5,060 4,563 9,725
673.00 6,110 5,585 15,310
674.00 13,125 9,618 24,928
675.00 14,775 13,950 38,878
Device Routing Invert Outlet Devices
#1 Device 3 669.00' 8.0" Round Culvert
L= 17.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 669.00' / 668.92' S= 0.0047 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 3 674.80' 24.0" x 24.0" Horiz. Orifice/Grate C= 0.600
Limited to weir flow at low heads
#3 Primary 668.92' 8.0" Round Culvert
L= 25.0' CPP, mitered to conform to fill, Ke= 0.700
Inlet / Outlet Invert= 668.92' / 668.80' S= 0.0048 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=3.43 cfs @ 13.03 hrs HW=674.69' (Free Discharge)
3=Culvert (Passes 3.43 cfs of 3.46 cfs potential flow)
1=Culvert (Inlet Controls 3.43 cfs @ 9.84 fps)
2=Orifice/Grate ( Controls 0.00 cfs)
Page 1328 of 1493
Page 1329
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 57
Pond 3P: Detention Pond
Hydrograph
Inflow
24.24 cfs Primary
26
24
Inflow Area=253,441 sf
22 Peak Elev=674.69'
20
Storage=34,430 cf
18
16
Flow (cfs)
14
12
10
8
6
3.43 cfs
4
2
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1329 of 1493
Page 1330
23-4121 storm calcs - Proposed Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 6/18/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 58
Summary for Link 3L: Proposed - Total
Inflow Area = 275,173 sf, 46.75% Impervious, Inflow Depth = 3.83" for 100-Year event
Inflow = 4.61 cfs @ 12.01 hrs, Volume= 87,794 cf
Primary = 4.61 cfs @ 12.01 hrs, Volume= 87,794 cf, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Link 3L: Proposed - Total
Hydrograph
Inflow
4.61 cfs Primary
5 4.61 cfs
Inflow Area=275,173 sf
4
3
Flow (cfs)
2
1
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Time (hours)
Page 1330 of 1493
Page 1331
Appendix E
Soil Information
Page 1331 of 1493
Page 1332
Hydrologic Soil Group—Erie County, New York
78° 46' 6'' W
78° 45' 44'' W
682440 682490 682540 682590 682640 682690 682740 682790 682840 682890 682940
42° 48' 45'' N 42° 48' 45'' N
4742410
4742410
4742360
4742360
4742310
4742310
4742260
4742260
4742210
4742210
4742160
4742160
4742110
Soil Map may not be valid at this scale.
4742110
42° 48' 34'' N 42° 48' 34'' N
682490 682540 682590 682640 682690 682740 682790 682840 682890 682940
Map Scale: 1:2,300 if printed on A landscape (11" x 8.5") sheet.
Meters
78° 46' 6'' W
78° 45' 44'' W
N 0 30 60 120 180
Feet
0 100 200 400 600
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84
Natural Resources Web Soil Survey 5/14/2026
Page 1332 of 1493
Conservation Service National Cooperative Soil Survey Page 1 of 4
Page 1333
Hydrologic Soil Group—Erie County, New York
MAP LEGEND MAP INFORMATION
Area of Interest (AOI) C The soil surveys that comprise your AOI were mapped at
Area of Interest (AOI) 1:15,800.
C/D
Soils Warning: Soil Map may not be valid at this scale.
D
Soil Rating Polygons
Not rated or not available Enlargement of maps beyond the scale of mapping can cause
A
misunderstanding of the detail of mapping and accuracy of soil
A/D Water Features line placement. The maps do not show the small areas of
Streams and Canals contrasting soils that could have been shown at a more detailed
B scale.
Transportation
B/D
Rails Please rely on the bar scale on each map sheet for map
C measurements.
Interstate Highways
C/D Source of Map: Natural Resources Conservation Service
US Routes
D
Web Soil Survey URL:
Major Roads Coordinate System: Web Mercator (EPSG:3857)
Not rated or not available
Local Roads Maps from the Web Soil Survey are based on the Web Mercator
Soil Rating Lines projection, which preserves direction and shape but distorts
Background
A distance and area. A projection that preserves area, such as the
Aerial Photography
Albers equal-area conic projection, should be used if more
A/D accurate calculations of distance or area are required.
B This product is generated from the USDA-NRCS certified data as
B/D
of the version date(s) listed below.
C Soil Survey Area: Erie County, New York
Survey Area Data: Version 25, Sep 4, 2025
C/D
Soil map units are labeled (as space allows) for map scales
D 1:50,000 or larger.
Not rated or not available Date(s) aerial images were photographed: May 13, 2023—May
27, 2023
Soil Rating Points
A The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
A/D imagery displayed on these maps. As a result, some minor
B shifting of map unit boundaries may be evident.
B/D
Natural Resources Web Soil Survey 5/14/2026
Page 1333 of 1493
Conservation Service National Cooperative Soil Survey Page 2 of 4
Page 1334
Hydrologic Soil Group—Erie County, New York
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
DbA Darien silt loam, 0 to 3 C/D 6.3 43.8%
percent slopes
Nh Niagara silt loam, till C/D 2.1 14.5%
substratum
RfB Remsen silty clay loam, D 6.0 41.7%
3 to 8 percent slopes
Totals for Area of Interest 14.5 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Natural Resources Web Soil Survey 5/14/2026
Conservation Service National Cooperative Soil Survey Page 3 of 4
Page 1334 of 1493
Page 1335
Hydrologic Soil Group—Erie County, New York
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Natural Resources Web Soil Survey 5/14/2026
Conservation Service National Cooperative Soil Survey Page 4 of 4
Page 1335 of 1493
Page 1336
Appendix E
NYSDEC SPDES General Permit for Stormwater Discharges from Construction
Activity Permit No. GP-0-25-001
Page 1336 of 1493
Page 1337
Page 1337 of 1493
Page 1338
PREFACE
Pursuant to Section 402 of the Clean Water Act (CWA), and 40 CFR
122.26(b)(14)(x), (15)(i), and (15)(ii), stormwater discharges from certain construction
activities are unlawful unless they are authorized by a National Pollutant Discharge
Elimination System (NPDES) permit or by a state permit program. New York State
administers the approved State Pollutant Discharge Elimination System (SPDES)
program with permits issued in accordance with the New York State Environmental
Conservation Law (ECL) Article 17, Titles 7 and 8, and Article 70, as well as 6 NYCRR
Parts 621 and 750.
Construction activities constitute construction of a point source and, therefore,
pursuant to ECL sections 17-0505, 17-0701, and 17-0803, the owner or operator must
have coverage under a SPDES permit prior to commencement of construction activities.
The owner or operator cannot wait until there is an actual discharge from the
construction site to obtain permit coverage.
*Note: The italicized words/phrases within this permit are defined in Appendix A.
Page 1338 of 1493
Page 1339
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
SPDES CONSTRUCTION GENERAL PERMIT (CGP) GP-0-25-001
FOR STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITIES
Table of Contents
Part I. How to Obtain Coverage and General Requirements ..................................... 5
A. Eligibility Requirements ...................................................................................... 5
B. Types of Discharges Authorized ........................................................................ 9
C. Prohibited Discharges ...................................................................................... 10
D. Electronic Notice of Intent (eNOI) Submittal..................................................... 10
E. General Requirements for Owners or Operators with Permit Coverage .......... 14
F. Permit Coverage for Discharges Authorized Under GP-0-20-001.................... 18
G. Change of Owner or Operator.......................................................................... 19
Part II. Water Quality-Based Effluent Limitations ..................................................... 20
A. Maintaining Water Quality ................................................................................ 20
B. Effluent Limitations Applicable to Discharges from Construction Activities ...... 20
C. Post-Construction Stormwater Management Practice (SMP) Requirements ... 23
Part III. Stormwater Pollution Prevention Plan (SWPPP) ......................................... 28
A. General SWPPP Requirements ....................................................................... 28
B. Required SWPPP Contents ............................................................................. 32
C. Required SWPPP Components by Project Type.............................................. 37
Part IV. Inspection and Maintenance Requirements ................................................ 37
A. General Construction Site Inspection and Maintenance Requirements ........... 37
B. Contractor Maintenance Inspection Requirements .......................................... 37
C. Qualified Inspector Inspection Requirements................................................... 38
Part V. How to Terminate CGP Coverage.................................................................. 43
A. Electronic Notice of Termination (eNOT) Submittal.......................................... 43
Part VI. Record Retention and Reporting.................................................................. 45
A. Record Retention ............................................................................................. 46
B. Reporting ......................................................................................................... 46
Part VII. Standard Permit Requirements ................................................................... 46
A. Duty to Comply................................................................................................. 46
B. Need to Halt or Reduce Activity Not a Defense................................................ 46
C. Penalties .......................................................................................................... 46
D. False Statements ............................................................................................. 47
E. Re-Opener Clause ........................................................................................... 47
F. Duty to Mitigate ................................................................................................ 47
G. Requiring Another General Permit or Individual SPDES Permit....................... 47
H. Duty to Provide Information.............................................................................. 49
I. Extension ......................................................................................................... 49
J. Signatories and Certification ............................................................................ 50
K. Inspection and Entry ........................................................................................ 52
L. Confidentiality of Information............................................................................ 53
M. Other Permits May Be Required ...................................................................... 53
Page 1339 of 1493
Page 1340
N. NYSDEC Orders or Civil Decrees/Judgments.................................................. 53
O. Property Rights ................................................................................................ 53
P. Compliance with Interstate Standards.............................................................. 53
Q. Oil and Hazardous Substance Liability............................................................. 54
R. Severability....................................................................................................... 54
S. NYSDEC Approved Forms............................................................................... 54
APPENDIX A – Abbreviations and Definitions.......................................................... 55
Abbreviations............................................................................................................. 55
Definitions.................................................................................................................. 56
APPENDIX B – Required SWPPP Components by Project Type............................. 64
Table 1....................................................................................................................... 64
Table 2....................................................................................................................... 66
APPENDIX C – Watersheds Requiring Enhanced Phosphorus Removal............... 68
APPENDIX D – Impaired Waterbodies (by Construction Related Pollutants) ........ 74
APPENDIX E – List of NYSDEC Regional Offices..................................................... 80
APPENDIX F – SWPPP Preparer Certification Form ................................................ 81
APPENDIX G – MS4 SWPPP Acceptance Form ........................................................ 83
APPENDIX H – NYCDEP SWPPP Acceptance/Approval Form ................................ 86
APPENDIX I – MS4 No Jurisdiction Form.................................................................. 89
APPENDIX J – Owner/Operator Certification Form .................................................. 91
Page 1340 of 1493
Page 1341
Part I.
Part I. How to Obtain Coverage and General Requirements
To be covered under this permit, the owner or operator must meet all eligibility
requirements in Part I.A. and follow the requirements for obtaining permit coverage in
Part I.D., F., or G.
A. Eligibility Requirements
For a common plan of development or sale, the phase(s) that meet the eligibility
requirements in Part I.A. may obtain coverage under this permit even if other
phase(s) of the same common plan of development or sale do not meet the
eligibility requirements and require an individual SPDES permit.
1. The owner’s or operator’s construction activities involve soil disturbances of:
a. one or more acres; or
b. less than one acre which are part of a common plan of development or
sale that will ultimately disturb one or more acres; or
c. less than one acre where NYSDEC has determined that a SPDES
permit is required for stormwater discharges based on the potential for
contribution to a violation of a water quality standard or for significant
contribution of pollutants to surface waters of the State.
i. 5,000 square feet or more, but less than one acre, and are in
the New York City Watershed located east of the Hudson River,
Appendix C Figure 1; or
ii. 20,000 square feet or more, but less than one acre, within the
municipal boundaries of the City of New York (NYC); or
iii. less than 20,000 square feet which are part of a common plan
of development or sale that will ultimately disturb 20,000 square
feet or more, but less than one acre, within the municipal
boundaries of NYC; or
iv. that creates 5,000 square feet or more of impervious area within
the municipal boundaries of NYC.
5
Page 1341 of 1493
Page 1342
Part I.A.2.
2. Discharges from the owner’s or operator’s construction activities are/were not:
a. already covered by a different SPDES permit; or
b. covered under a different SPDES permit that was denied, terminated,
or revoked; or
c. identified in an expired individual SPDES permit that was not renewed;
or
d. required to obtain an individual SPDES permit or another general
SPDES permit in accordance with Part VII.K.
3. If construction activities may adversely affect a species that is endangered or
threatened, the owner or operator must obtain a:
a. permit issued pursuant to 6 NYCRR Part 182 for the project; or
b. letter issued by NYSDEC of non-jurisdiction pursuant to 6 NYCRR Part
182 for the project.
4. If construction activities have the potential to affect an historic property, the
owner or operator must obtain one of the following:
a. documentation that the construction activity is not within an
archeological buffer area indicated on the sensitivity map, and that the
construction activity is not located on or immediately adjacent to a
property listed or determined to be eligible for listing on the National or
State Registers of Historic Places, and that there is no new permanent
building on the construction site within the following distances from a
building, structure, or object that is more than 50 years old, or if there
is such a new permanent building on the construction site within those
parameters that NYS Office of Parks, Recreation and Historic
Preservation (OPRHP), a Historic Preservation Commission of a
Certified Local Government, or a qualified preservation professional
has determined that the building, structure, or object more than 50
years old is not historically/archeologically significant:
i. 1-5 acres of disturbance - 20 feet; or
ii. 5-20 acres of disturbance - 50 feet; or
6
Page 1342 of 1493
Page 1343
Part I.A.4.a.iii.
iii. 20+ acres of disturbance - 100 feet.
b. NYSDEC consultation form sent to OPRHP, 1 and copied to NYSDEC’s
Agency Historic Preservation Officer (APO), and
i. the State Environmental Quality Review Act (SEQR)
Environmental Assessment Form (EAF) with a negative
declaration or the Findings Statement, with documentation of
OPRHP’s agreement with the resolution; or
ii. documentation from OPRHP that the construction activity will
result in No Impact; or
iii. documentation from OPRHP providing a determination of No
Adverse Impact; or
iv. a Letter of Resolution signed by the owner or operator, OPRHP
and the DEC APO which allows for this construction activity to
be eligible for coverage under the general permit in terms of the
State Historic Preservation Act (SHPA).
c. documentation of satisfactory compliance with Section 106 of the
National Historic Preservation Act for a coterminous project area:
i. No Affect; or
ii. No Adverse Affect; or
iii. Executed Memorandum of Agreement.
d. documentation that SHPA Section 14.09 has been completed by
NYSDEC or another state agency.
5. If construction activities are subject to SEQR, the owner or operator must
obtain documentation that SEQR has been satisfied.
6. If construction activities are not subject to SEQR, but subject to the equivalent
environmental review from another New York State or federal agency, the
1
The consultation form can be submitted, along with other project information, through
OPRHP's Cultural Resource Information System (CRIS) portal. If submitted through CRIS,
paper copies of the consultation form need not be mailed.
7
Page 1343 of 1493
Page 1344
Part I.A.6.
owner or operator must obtain documentation that project review, pursuant to
a process equivalent to SEQR from another New York State or federal
agency, has been satisfied.
7. If construction activities require Uniform Procedures Act (UPA) Permits (see 6
NYCRR Part 621) from NYSDEC, or the equivalent from another New York
State or federal agency, the owner or operator must:
a. obtain all such necessary permits; or
b. receive notification from NYSDEC pursuant to 6 NYCRR 621.3(a)(4)
excepting Part I.A.7.a.
8. Construction activities are not eligible if they meet the following criteria in Part
I.A.8.a. or b.:
a. For linear transportation and linear utility project types, the construction
activities:
i. are within the watershed of surface waters of the State
classified as AA or AA-S identified utilizing the Stormwater
Interactive Map on NYSDEC’s website; and
ii. are undertaken on land with no existing impervious cover; and
iii. disturb two or more acres of steep slope.
b. For all other project types, the construction activities:
i. are within the watershed of surface waters of the State
classified as AA or AA-S identified utilizing the Stormwater
Interactive Map on NYSDEC’s website; and
ii. are undertaken on land with no existing impervious cover; and
iii. disturb one or more acres of steep slope.
8
Page 1344 of 1493
Page 1345
Part I.B.
B. Types of Discharges Authorized
1. The following stormwater discharges are authorized under this permit:
a. Stormwater discharges, including stormwater runoff, snowmelt runoff, and
surface runoff and drainage, associated with construction activity, are
authorized under this permit provided that appropriate stormwater controls
are designed, installed, and maintained in accordance with Part II. and
Part III.
b. Stormwater discharges from construction support activities at the
construction site (including concrete or asphalt batch plants, equipment
staging yards, material storage areas, excavated material disposal areas,
and borrow areas) if the following requirements are met:
i. The support activity is directly related to the construction site
required to have permit coverage for stormwater discharges; and
ii. The support activity is not a commercial operation, nor does it serve
multiple unrelated construction sites; and
iii. The support activity does not continue to operate beyond the
completion of the construction activity at the site it supports; and
iv. Stormwater controls are implemented in accordance with Part II.
and Part III. for discharges from the support activity areas.
2. The following non-stormwater discharges associated with construction activity
are authorized under this permit:
a. Non-stormwater discharges listed in 6 NYCRR 750-1.2(a)(29)(vi), with the
following exception: “Discharges from firefighting activities are authorized
only when the firefighting activities are emergencies/unplanned”; and
b. Non-stormwater discharges of waters to which other components have not
been added that are used in accordance with the SWPPP to control dust
or irrigate vegetation in stabilized areas; and
c. Uncontaminated discharges from dewatering operations
9
Page 1345 of 1493
Page 1346
Part I.B.3.
3. Authorized discharges of stormwater or authorized discharges of non-
stormwater, commingled with a discharge authorized by a different SPDES
permit and/or a discharge that does not require SPDES permit authorization,
are also authorized under this permit.
C. Prohibited Discharges
1. Non-stormwater discharges prohibited under this permit include but are not
limited to:
a. Wastewater from washout of concrete; and
b. Wastewater from washout and cleanout of stucco, paint, form release
oils, curing compounds, and other construction materials; and
c. Fuels, oils, or other pollutants used in vehicle and equipment operation
and maintenance; and
d. Soaps, solvents, or detergents used in vehicle and equipment washing
or external building washdown; and
e. Toxic or hazardous substances from a spill or other release.
D. Electronic Notice of Intent (eNOI) Submittal
To receive authorization in accordance with Part I.D.3.b., the owner or operator
must submit a complete eNOI in accordance with the requirements in Part I.D.
The eNOI contains questions to: ensure eligibility requirements in Part I.A. have
been met; obtain owner or operator contact information; obtain the total area to
be disturbed and the existing/future impervious areas (rounded to the nearest
tenth of an acre); confirm Traditional Land Use Control MS4 Operator jurisdiction
over construction projects; satisfy the EPA eRule requirements; confirm that the
Water Quality-Based Effluent Limitations in Part II. have been met; demonstrate
consideration of the future risks due to climate change in accordance with Part
III.A.2.; and confirm that the other Stormwater Pollution Prevention Plan
(SWPPP) requirements in Part III. have been met.
1. An eNOI may be submitted for:
a. construction activities that are not part of a common plan of
development or sale; or
10
Page 1346 of 1493
Page 1347
Part I.D.1.b.
b. an entire common plan of development or sale; or
c. separate phase(s) of a common plan of development or sale if the
following requirements are met:
i. the common plan of development or sale meets the eligibility
requirements of Part I.A.5. or 6.; and
ii. the phase(s) meet(s) all other eligibility requirements of Part
I.A.; and
iii. Part III.C. Required SWPPP Components by Project Type is
based on the common plan of development or sale, not the
phase(s); or
d. tree clearing that is associated with, or will support, a renewable
energy generation, transmission, or storage project that meets Part
I.A.5. and 6., if the tree clearing:
i. meets all other eligibility requirements of Part I.A.; and
ii. will occur in NYSDEC’s Regions 3-9; and
iii. is not within ¼ mile of a bat hibernaculum protected pursuant to
6 NYCRR Part 182; and
iv. will occur between November 1st and March 31st.
2. As prerequisites for submitting an eNOI, the owner or operator must:
a. prepare a SWPPP for Part I.D.1.a., b., c., or d. in accordance with Part
III.; and
b. based on the following criteria, upload the following signature forms
signed in accordance with Part VII.J. to the eNOI prior to submission:
i. for all eNOIs:
1. the SWPPP Preparer Certification Form, Appendix F,
signed by the SWPPP preparer; and
11
Page 1347 of 1493
Page 1348
Part I.D.2.b.i.2.
2. the Owner/Operator Certification Form, Appendix J,
signed by the owner or operator; and
ii. if an eNOI includes construction activities within the municipal
boundary(ies) of Traditional Land Use Control MS4 Operator(s)
that will discharge to the MS4(s):
1. determine if the Traditional Land Use Control MS4
Operator(s) have review authority. A Traditional Land
Use Control MS4 Operator does not have review
authority where:
a. the owner or operator of the construction activities
in Part I.D.2.b.ii. is the same entity as the
Traditional Land Use Control MS4 Operator
identified in Part I.D.2.b.ii.; or
b. there is a statute exempting the owner or operator
from zoning review by the Traditional Land Use
Control MS4 Operator; or
c. there is no such statute per Part I.D.2.b.ii.1.b., the
Traditional Land Use Control MS4 Operator
concludes, after public hearing, that it does not
have zoning review authority in accordance with
Legal Memorandum LU14 Updated January 2020
“Governmental Immunity from Zoning and Other
Legislation”; and
2. if the Traditional Land Use Control MS4 Operator(s) have
review authority, submit the SWPPP to the Traditional
Land Use Control MS4 Operator(s) for review and have:
a. if outside the municipal boundaries of NYC: the
MS4 SWPPP Acceptance Form, Appendix G,
signed by the principal executive officer or ranking
elected official from the Traditional Land Use
Control MS4 Operator, or by a duly authorized
representative of that person in accordance with
Part VII.J.2.; or
12
Page 1348 of 1493
Page 1349
Part I.D.2.b.ii.2.b.
b. if within the municipal boundaries of NYC: The
City of New York Department of Environmental
Protection (NYCDEP) SWPPP
Acceptance/Approval Form, Appendix H, signed
by the principal executive officer or ranking elected
official from the Traditional Land Use Control MS4
Operator, or by a duly authorized representative of
that person in accordance with Part VII.J.2.; and
3. if the Traditional Land Use Control MS4 Operator does
not have review authority, have the MS4 No Jurisdiction
Form, Appendix I, signed by the principal executive
officer or ranking elected official from the Traditional Land
Use Control MS4 Operator, or by a duly authorized
representative of that person in accordance with Part
VII.J.2.
3. Submitting an eNOI:
a. The owner or operator must submit a complete Notice of Intent
electronically using a NYSDEC approved form. 2
b. The owner or operator is authorized to commence construction activity
as of the authorization date indicated in the Letter of Authorization
(LOA), which is sent by NYSDEC after a complete eNOI is submitted.
i. If an eNOI is received for a SWPPP that deviates from one of
the technical standards but demonstrates equivalence in
accordance with Part III.B.1.a.ii. or Part III.B.2.b.ii., if the
SWPPP includes construction activities that are not within the
municipal boundary(ies) of Traditional Land Use Control MS4
Operator(s), and/or if the SWPPP includes construction
activities within the municipal boundary(ies) of Traditional Land
Use Control MS4 Operator(s) that do not have review authority
in accordance with Part I.D.2.b.ii.1., the authorization date
indicated in the LOA will be 60 business days after the eNOI
submission date.
2 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or (d). All waiver requests must
be submitted to [email protected] or NYSDEC, Bureau of Water Permits, 625 Broadway, 4th
Floor, Albany, New York 12233-3505.
13
Page 1349 of 1493
Page 1350
Part I.D.3.c.
c. If Traditional Land Use Control MS4 Operator(s) have review authority
in accordance with Part I.D.2.b.ii.2., the owner or operator must, within
five business days of receipt of the LOA, send an electronic copy of the
LOA to the Traditional Land Use Control MS4 Operator(s) with review
authority.
E. General Requirements for Owners or Operators with Permit Coverage
1. As of the date the LOA is received, the owner or operator must make the
eNOI, SWPPP, and LOA available for review and copying in accordance with
the requirements in Part VII.H. When applicable, as of the date an updated
LOA is received, the owner or operator must make the updated LOA available
for review and copying in accordance with the requirements in Part VII.H.
2. The owner or operator must ensure compliance with all requirements of this
permit and that the provisions of the SWPPP, including any changes made to
the SWPPP in accordance with Part III.A.5., are properly implemented and
maintained from the commencement of construction activity until:
a. all areas of disturbance have achieved final stabilization; and
b. the owner’s or operator’s coverage under this permit is terminated in
accordance with Part V.A.5.a.
3. As of the date of the commencement of construction activities until Part
I.E.2.a. and b. have been met, the owner or operator must maintain at the
construction site, a copy of:
a. all documentation necessary to demonstrate eligibility with this permit; and
b. this permit; and
c. the SWPPP; and
d. the signed SWPPP Preparer Certification Form; and
e. the signed MS4 SWPPP Acceptance Form or signed NYCDEP SWPPP
Acceptance/Approval Form or signed MS4 No Jurisdiction Form (when
applicable); and
f. the signed Owner/Operator Certification Form; and
14
Page 1350 of 1493
Page 1351
Part I.E.3.g.
g. the eNOI; and
h. the LOA; and
i. the LOA transmittal to the Traditional Land Use Control MS4 Operator in
accordance with Part I.D.3.c. (when applicable).
4. The owner or operator must maintain at the construction site, until Part
I.E.2.a. and b. have been met, as of the date the documents become final or
are received, a copy of the:
a. responsible contractor’s or subcontractor’s certification statement(s) in
accordance with Part III.A.7.; and
b. inspection reports in accordance with Part IV.C.4. and 6.; and
c. Request to Disturb Greater Than Five Acres and the Authorization Letter
to Disturb Greater Than Five Acres in accordance with Part I.E.6. (when
applicable); and
d. Request to Continue Coverage and the Letter of Continued Coverage
(LOCC) in accordance with Part I.F.2. and 4. (when applicable); and
e. The updated LOA(s) in accordance with Part I.E.9. (when applicable).
5. The owner or operator must maintain the documents in Part I.E.3. and 4. in a
secure location, such as a job trailer, on-site construction office, or mailbox
with lock. The secure location must be accessible during normal business
hours to an individual performing a compliance inspection. The documents
must be paper documents unless electronic documents are accessible to the
inspector during an inspection to the same extent as a paper copy stored at
the site would be. If electronic documents are kept on site, the owner or
operator must maintain functional equipment on site available to an inspector
during normal hours of operation such that an inspector may view the
electronic documents in a format that can be read in a similar manner as a
paper record and in a legally dependable format with no less evidentiary
value than their paper equivalent.
6. The owner or operator must meet the following requirements prior to
disturbing greater than five acres of soil at any one time:
a. The owner or operator must submit a written Request to Disturb Greater
Than Five Acres to:
15
Page 1351 of 1493
Page 1352
Part I.E.6.a.i.
i. NYSDEC’s Regional Office Division of Water staff based on the
project location, Appendix E, if a Traditional Land Use Control MS4
Operator does not have review authority in accordance with Part
I.D.2.b.ii.1.; or
ii. the Traditional Land Use Control MS4 Operator, if a Traditional
Land Use Control MS4 Operator has review authority in
accordance with Part I.D.2.b.ii.1.; or
iii. NYSDEC’s Regional Office Division of Water staff based on the
project location, Appendix E, and each involved Traditional Land
Use Control MS4 Operator, if the project spans multiple
municipalities with more than one Traditional Land Use Control
MS4 Operator involved with review authority in accordance with
Part I.D.2.b.ii.1.
b. The written Request to Disturb Greater Than Five Acres must include:
i. The SPDES permit identification number (Permit ID); and
ii. Full technical justification demonstrating why alternative methods of
construction that would result in five acres of soil disturbance or
less at any one time are not feasible; and
iii. The phasing plan for the project and sequencing plans for all
phases from the SWPPP in accordance with Part III.B.1.d.; and
iv. Plans with locations and details of erosion and sediment control
practices such that the heightened concern for erosion when
disturbing greater than five acres at one time has been addressed;
and
v. Acknowledgment that “the owner or operator will comply with the
requirements in Part IV.C.2.b.”; and
vi. Acknowledgment that “the owner or operator will comply with the
requirements in Part II.B.1.b.”
c. The owner or operator must be in receipt of an Authorization Letter to
Disturb Greater Than Five Acres, which will include when the
16
Page 1352 of 1493
Page 1353
Part I.E.6.c.
authorization begins and ends and indicate a maximum area (acres) of
soil disturbance allowed at any one time, from:
i. NYSDEC, if Part I.E.6.a.i. or iii. apply; or
ii. the Traditional Land Use Control MS4 Operator, if Part I.E.6.a.ii.
applies.
7. Upon a finding of significant non-compliance with the practices described in
the SWPPP or violation of this permit, NYSDEC may order an immediate stop
to all construction activity at the site until the non-compliance is remedied.
The stop work order must be in writing, describe the non-compliance in detail,
and be sent to the owner or operator.
8. If any human remains or archaeological remains are encountered during
excavation, the owner or operator must immediately cease, or cause to
cease, all construction activity in the area of the remains and notify the
appropriate Regional Water Engineer (RWE). 3 Construction activity shall not
resume until written permission to do so has been received from the RWE.
9. To be authorized to implement modifications to the information previously
submitted in the eNOI, the owner or operator must:
a. notify NYSDEC via email at [email protected] requesting
access to update the eNOI; and
b. update the eNOI to reflect the modifications and resubmit the eNOI in
accordance with Part I.D.; and
c. receive an updated LOA.
10. The eNOI, SWPPP, LOA, updated LOAs (when applicable), and inspection
reports required by this permit are public documents that the owner or
operator must make available for review and copying by any person within
five business days of the owner or operator receiving a written request by any
such person to review these documents. Copying of documents will be done
at the requester’s expense.
3 The Regional Water Manager where a DEC Region does not have a RWE.
17
Page 1353 of 1493
Page 1354
Part I.F.
F. Permit Coverage for Discharges Authorized Under GP-0-20-001
When applicable:
1. Upon the effective date of this permit, an owner or operator of a construction
activity, with coverage under GP-0-20-001, will have interim coverage under
GP-0-25-001 for 45 calendar days starting on the effective date of GP-0-25-
001 so long as the owner or operator maintains compliance with all applicable
requirements of this permit.
2. Within 30 calendar days of the effective date of this permit, the owner or
operator, with coverage under GP-0-20-001, must submit a complete Request
to Continue Coverage electronically using a NYSDEC approved form, 4 which
contains the information identified in Part I.F.3. below, if:
a. the owner or operator continues to implement the SMP component in
conformance with the technical standards in place at the time of initial
project authorization; and
b. the owner or operator will comply with all non-design requirements of GP-
0-25-001.
3. The Request to Continue Coverage form contains questions to: ensure
eligibility requirements in Part I.A. have been met; verify owner or operator
contact information; verify the permit identification number; verify the original
eNOI submission ID, if applicable; verify Part I.F.2.a. and b.; verify the version
of the Design Manual that the technical/design components conform to; and
receive an updated Owner/Operator Certification Form, Appendix I.
4. The owner or operator has obtained continued coverage under GP-0-25-001
as of the date indicated in the LOCC, which is sent by NYSDEC after a
complete Request to Continue Coverage form is submitted.
5. If the owner or operator does not submit the Request to Continue Coverage
form in accordance with Part I.F.2. and 3., coverage under this permit is
automatically terminated after interim coverage expires.
4 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or (d). All waiver requests must
be submitted to [email protected] or NYSDEC, Bureau of Water Permits, 625 Broadway, 4th
Floor, Albany, New York 12233-3505.
18
Page 1354 of 1493
Page 1355
Part I.G.
G. Change of Owner or Operator
When applicable:
1. When property ownership changes, or when there is a change in operational
control over the construction plans and specifications, the following process
applies:
a. The new owner or operator must meet the applicable prerequisites for
submitting an eNOI in accordance with Part I.D.2.; and
b. The new owner or operator must submit an eNOI in accordance with Part
I.D.3.; and
c. Permit coverage for the new owner or operator will be effective upon
receipt of the LOA in accordance with Part I.D.3.b.; and
d. The new owner or operator, upon receipt of their LOA, must provide their
Permit ID to the original owner or operator; and
e. If the original owner or operator will no longer be the owner or operator of
the construction activity identified in the original owner’s or operator’s
eNOI, the original owner or operator, upon receipt of the new owner’s or
operator’s Permit ID in accordance with Part I.G.1.d., must submit to
NYSDEC a completed eNOT in accordance with Part V. that includes the
name and Permit ID of the new owner or operator; or
f. If the original owner or operator maintains ownership of a portion of the
construction activity, the original owner or operator must maintain their
coverage under the permit by modifying their eNOI; modifications to the
eNOI must include:
i. the revised area of disturbance and/or impervious area(s); and
ii. the revised SMP information, if applicable; and
iii. a narrative description of what has changed; and
iv. the new owner’s or operator’s Permit ID for the portion of the
project removed from the eNOI.
Owners or operators must follow Part I.E.9. to modify the eNOI.
19
Page 1355 of 1493
Page 1356
Part II.
Part II. Water Quality-Based Effluent Limitations
A. Maintaining Water Quality
NYSDEC expects that compliance with the requirements of this permit will control
discharges necessary to meet applicable water quality standards. It shall be a
violation of the ECL for any discharge to either cause or contribute to a violation
of the following water quality standards as contained in Parts 700 through 705 of
Title 6 of the Official Compilation of Codes, Rules and Regulations of the State of
New York:
1. There must be no increase in turbidity that will cause a substantial visible
contrast to natural conditions; and
2. There must be no increase in suspended, colloidal or settleable solids that will
cause deposition or impair the waters for their best usages; and
3. There must be no residue from oil and floating substances, nor visible oil film,
nor globules of grease.
If there is evidence indicating that the stormwater discharges authorized by this
permit are causing, have the reasonable potential to cause, or are contributing to
a violation of the water quality standard, the owner or operator must take
appropriate corrective action in accordance with Part IV.C.5. of this permit and
document in accordance with Part IV.C.4. of this permit. To address the water
quality standard violation the owner or operator must include and implement
appropriate controls in the SWPPP to correct the problem or obtain an individual
SPDES permit.
If, despite compliance with the requirements of this permit, it is demonstrated that
the stormwater discharges authorized by this permit are causing or contributing
to a violation of water quality standards, or if NYSDEC determines that a
modification of this permit is necessary to prevent a violation of water quality
standards, the authorized discharges will no longer be eligible for coverage under
this permit, and the owner or operator must obtain an individual SPDES permit
prior to further discharges from the construction site.
B. Effluent Limitations Applicable to Discharges from Construction Activities
Discharges authorized by this permit must achieve, at a minimum, the effluent
limitations in Part II.B.1.a., b., c., d., and e. These limitations represent the
20
Page 1356 of 1493
Page 1357
Part II.B.
degree of effluent reduction attainable by the application of best practicable
technology currently available.
1. Erosion and Sediment Control Requirements - The owner or operator must
select, design, install, implement, and maintain control measures to minimize
the discharge of pollutants and prevent a violation of the water quality
standards. The selection, design, installation, implementation, and
maintenance of these control measures must meet the non-numeric effluent
limitations in Part II.B.1.a., b., c., d., and e. and be in accordance with the
New York State Standards and Specifications for Erosion and Sediment
Control (BB), dated November 2016, using sound engineering judgment.
Where control measures are not designed in conformance with the design
criteria included in the technical standard, the owner or operator must include
in SWPPP the reason(s) for the deviation, or alternative design, and provide
information in the SWPPP demonstrating that the deviation or alternative
design is equivalent to the technical standard.
a. Erosion and Sediment Controls. At a minimum, erosion and sediment
controls must be selected, designed, installed, implemented, and
maintained to:
i. Minimize soil erosion through application of runoff control and soil
stabilization control measure to minimize pollutant discharges; and
ii. Control stormwater discharges, including both peak flow rates and
total stormwater volume, to minimize channel and streambank
erosion and scour in the immediate vicinity of the discharge points;
and
iii. Minimize the amount of soil exposed during construction activity;
and
iv. Minimize the disturbance of steep slope; and
v. Minimize sediment discharges from the site; and
vi. Provide and maintain natural buffers around surface waters, direct
stormwater to vegetated areas and maximize stormwater infiltration
to reduce pollutant discharges, unless infeasible; and
vii. Minimize soil compaction. Minimizing soil compaction is not required
21
Page 1357 of 1493
Page 1358
Part II.B.1.a.vii.
where the intended function of a specific area of the site dictates that
it be compacted; and
viii. Unless infeasible, preserve a sufficient amount of topsoil to complete
soil restoration and establish a uniform, dense vegetative cover; and
ix. Minimize dust. On areas of exposed soil, minimize dust through the
appropriate application of water or other dust suppression techniques
to control the generation of pollutants that could be discharged from
the site.
b. Soil Stabilization. In areas where soil disturbance activity has ceased,
whether permanently or temporarily ceased, the application of soil
stabilization measures must be initiated by the end of the next business
day and completed within 14 calendar days from the date the current soil
disturbance activity ceased. For construction sites that directly discharge
to one of the 303(d) segments listed in Appendix D, or are located in one
of the watersheds listed in Appendix C, or are authorized to disturb greater
than five acres in accordance with Part I.E.5.a.viii., the application of soil
stabilization measures must be initiated by the end of the next business
day and completed within seven calendar days from the date the soil
disturbance activity ceased.
c. Dewatering. Discharges from dewatering activities, including discharges
from dewatering of trenches and excavations, must be managed by
appropriate control measures.
d. Pollution Prevention Measures. Select, design, install, implement, and
maintain effective pollution prevention measures to minimize the
discharge of pollutants and prevent a violation of the water quality
standards. At a minimum, such measures must be selected, designed,
installed, implemented, and maintained to:
i. Minimize the discharge of pollutants from equipment and vehicle
washing, wheel wash water, and other wash waters. Soaps,
detergents and solvents cannot be used; and
ii. Minimize the exposure of building materials, building products,
construction wastes, trash, landscape materials, fertilizers,
pesticides, herbicides, detergents, sanitary waste, hazardous and
toxic waste, and other materials present on the site to precipitation
22
Page 1358 of 1493
Page 1359
Part II.B.1.d.ii.
and to stormwater. Minimization of exposure is not required in
cases where the exposure to precipitation and to stormwater will
not result in a discharge of pollutants, or where exposure of a
specific material or product poses little risk of stormwater
contamination (such as final products and materials intended for
outdoor use); and
iii. Prevent the discharge of pollutants from spills and leaks and
implement chemical spill and leak prevention and response
procedures.
e. Surface Outlets. When discharging from basins and impoundments, the
surface outlets must be designed, constructed, and maintained in such a
manner that sediment does not leave the basin or impoundment and that
erosion at or below the outlet does not occur.
C. Post-Construction Stormwater Management Practice (SMP) Requirements
1. The owner or operator of a construction activity that requires post-
construction SMPs, in accordance with Part III.C., must select, design, install,
implement, and maintain the SMPs to meet the performance criteria in the
New York State Stormwater Management Design Manual, dated July 31,
2024 (DM), using sound engineering judgment. Where SMPs are not
designed in conformance with the performance criteria in the DM, the owner
or operator must include in the SWPPP the reason(s) for the deviation or
alternative design and provide information which demonstrates that the
deviation or alternative design is equivalent to the technical standard.
2. The owner or operator of a construction activity, that requires SMPs in
accordance with Part III.C., must design the practices to meet the applicable
sizing criteria in Part II.C.2.a., b., c., or d.
a. Sizing Criteria for New Development
i. Runoff Reduction Volume (RRv) and Water Quality Volume (WQv):
1. Reduce the total WQv by application of RR techniques and
standard SMPs with RRv capacity. The total WQv must be
calculated in accordance with the criteria in Section 4.2 of
the DM; or
23
Page 1359 of 1493
Page 1360
Part II.C.2.a.i.2.
2. Minimum RRv and Treatment of Remaining Total WQv:
Construction activities that cannot meet the requirements in
Part II.C.2.a.i.1. due to site limitations must direct runoff from
all newly constructed impervious areas to a RR technique or
standard SMP with RRv capacity unless infeasible. The
specific site limitations that prevent the reduction of 100% of
the WQv must be documented in the SWPPP. For each
impervious area that is not directed to a RR technique or
standard SMP with RRv capacity, the SWPPP must include
documentation which demonstrates that all options were
considered and for each option explains why it is considered
infeasible.
In no case shall the runoff reduction achieved from the
newly constructed impervious areas be less than the
Minimum RRv as calculated using the criteria in Section
4.4 of the DM. The remaining portion of the total WQv that
cannot be reduced must be treated by application of
standard SMPs.
ii. Channel Protection Volume (CPv): Provide 24 hour extended
detention of the post-developed 1-year, 24-hour storm event,
remaining after runoff reduction. Where a CPv control orifice is
provided, the minimum orifice size must be 3 inches, with
acceptable external trash rack or orifice protection. The CPv
requirement does not apply when:
1. Reduction of the entire CPv is achieved by application of
runoff reduction techniques or infiltration systems; or
2. The 1-year post-development peak discharge is less than or
equal to 2.0 cfs without detention or velocity controls; or
3. The site directly discharges into a fifth order or larger water
body (stream, river, or lake), or tidal waters, where the
increase in smaller flows will not impact the stream bank or
channel integrity. However, the point of discharge must be
adequately protected against scour and erosion by the
increased peak discharge.
24
Page 1360 of 1493
Page 1361
Part II.C.2.a.iii.
iii. Overbank Flood Control Criteria (Qp): Requires storage to
attenuate the post-development 10-year, 24-hour peak discharge
rate (Qp) to predevelopment rates. The Qp requirement does not
apply when:
1. the site directly discharges to tidal waters or fifth order or
larger streams, or
2. A downstream analysis reveals that overbank control is not
required.
iv. Extreme Flood Control Criteria (Qf): Requires storage to attenuate
the post-development 100-year, 24-hour peak discharge rate (Qf)
to predevelopment rates. The Qf requirement does not apply when:
1. the site directly discharges to tidal waters or fifth order or
larger streams, or
2. A downstream analysis reveals that overbank control is not
required.
b. Sizing Criteria for New Development in Enhanced Phosphorus
Removal Watersheds
i. Runoff Reduction Volume (RRv) and Water Quality Volume (WQv):
1. Reduce the WQv by application of RR techniques and
standard SMPs with RRv capacity. The total WQv is the
runoff volume from the 1-year, 24-hour design storm over
the post-developed watershed and must be calculated in
accordance with the criteria in Section 4.3 of the DM; or
2. Minimum RRv and Treatment of Remaining Total WQv:
Construction activities that cannot meet the criteria in Part
II.C.2.b.i.1. due to site limitations must direct runoff from all
newly constructed impervious areas to a RR technique or
standard SMP with RRv capacity unless infeasible. The
specific site limitations that prevent the reduction of 100% of
the WQv must be documented in the SWPPP. For each
impervious area that is not directed to a RR technique or
standard SMP with RRv capacity, the SWPPP must include
25
Page 1361 of 1493
Page 1362
Part II.C.2.b.i.2.
documentation which demonstrates that all options were
considered and for each option explains why it is considered
infeasible.
In no case shall the runoff reduction achieved from the
newly constructed impervious areas be less than the
Minimum RRv as calculated using the criteria in Section
4.5 of the DM. The remaining portion of the total WQv that
cannot be reduced must be treated by application of
standard SMPs.
ii. Channel Protection Volume (CPv): Provide 24 hour extended
detention of the post-developed 1-year, 24-hour storm event,
remaining after runoff reduction. Where a CPv control orifice is
provided, the minimum orifice size must be 3 inches, with
acceptable external trash rack or orifice protection. The CPv
requirement does not apply when:
1. Reduction of the entire CPv is achieved by application of
runoff reduction techniques or infiltration systems; or
2. The 1-year post-development peak discharge is less than or
equal to 2.0 cfs; or
3. The site directly discharges to tidal waters, or a fifth order or
larger water body (stream, river, or lake) where the increase
in smaller flows will not impact the stream bank or channel
integrity. However, the point of discharge must be
adequately protected against scour and erosion by the
increased peak discharge.
iii. Overbank Flood Control Criteria (Qp): Requires storage to
attenuate the post-development 10-year, 24-hour peak discharge
rate (Qp) to predevelopment rates. The Qp requirement does not
apply when:
1. the site directly discharges to tidal waters or fifth order or
larger streams; or
2. A downstream analysis reveals that overbank control is not
required.
26
Page 1362 of 1493
Page 1363
Part II.C.2.b.iv.
iv. Extreme Flood Control Criteria (Qf): Requires storage to attenuate
the post-development 100-year, 24-hour peak discharge rate (Qf)
to predevelopment rates. The Qf requirement does not apply when:
1. the site directly discharges to tidal waters or fifth order or
larger streams; or
2. A downstream analysis reveals that overbank control is not
required.
c. Sizing Criteria for Redevelopment Activity
i. Water Quality Volume (WQv): The WQv treatment objective for
redevelopment activity must be addressed by one of the following
options, as outlined in Section 9.2.1. Redevelopment activities
located in an Enhanced Phosphorus Removal Watershed (see Part
III.B.3. and Appendix C) must calculate the WQv in accordance
with Section 4.3 of the DM. All other redevelopment activities must
calculate the WQv in accordance with Section 4.2 of the DM.
1. Reduce the existing impervious cover by a minimum of 25%
of the total disturbed, impervious area. The Soil Restoration
criteria in Section 5.1.6 of the DM must be applied to all
newly created pervious areas; or
2. Capture and treat 100% of the required WQv, for a minimum
of 25% of the disturbed redevelopment impervious area, by
implementation of standard SMPs or reduced by application
of runoff reduction techniques; or
3. Capture and treat 100% of the required WQv, for a minimum
of 75% of the disturbed redevelopment impervious area, by
implementation of a volume-based alternative SMP, as
defined in Section 9.4 of the DM; or
4. Capture and treat 100% of the required WQv, for a minimum
of 75% of the disturbed redevelopment impervious area, by
implementation of a flow-through alternative SMP sized to
treat the peak rate of runoff from the WQv design storm; or
27
Page 1363 of 1493
Page 1364
Part II.C.2.c.i.5.
5. Application of a combination of 1 through 4 above that
provide a weighted average of at least two of the above
methods. Application of this method must be in accordance
with the criteria in Section 9.2.1(A)(V) of the DM; or
6. If there is an existing SMP located on the site that captures
and treats runoff from the impervious area that is being
disturbed, the WQv treatment option selected must, at a
minimum, provide treatment equal to the treatment that was
being provided by the existing practice(s) if that treatment is
greater than the treatment required by options 1 through 5
above.
ii. Channel Protection Volume (CPv) is not required if there is 0%
change to hydrology that increases the discharge rate and volume
from the project site.
iii. Overbank Flood Control (Qp) is not required if there is 0% change
to hydrology that increases the discharge rate from the project site.
iv. Extreme Flood Control (Qf) is not required if there is 0% change to
hydrology that increases the discharge rate from the project site.
d. Sizing Criteria for Combination of Redevelopment Activity and New
Development
Construction projects, that include both new development and redevelopment
activity, must use SMPs that meet the sizing criteria calculated as an
aggregate of the sizing criteria in Part II.C.2.a. or b. for the new development
portion of the project and Part II.C.2.c. for the redevelopment activity portion
of the project.
Part III. Stormwater Pollution Prevention Plan (SWPPP)
A. General SWPPP Requirements
1. A SWPPP must be prepared and implemented by the owner or operator of all
construction activity covered by this permit. All authorized discharges must be
identified in the SWPPP. The SWPPP must document the selection, design,
installation, implementation and maintenance of the control measures and
28
Page 1364 of 1493
Page 1365
Part III.A.1.
practices that will be used to meet the effluent limitations in Part II.B. and,
where applicable, the SMP requirements in Part II.C.
2. The SWPPP must demonstrate consideration in narrative format of the future
physical risks due to climate change pursuant to the Community Risk and
Resiliency Act (CRRA), 6 NYCRR Part 490, and associated guidance.
a. The owner or operator must consider:
i. the following physical risks due to climate change:
(i) increasing temperature; and
(ii) increasing precipitation; and
(iii) increasing variability in precipitation, including chance of
drought; and
(iv) increasing frequency and severity of flooding; and
(v) rising sea level; and
(vi) increasing storm surge; and
(vii) shifting ecology.
ii. for each of the following:
(i) overall site planning; and
(ii) location, elevation, and sizing of:
a. control measures and practices; and
b. conveyance system(s); and
c. detention system(s).
3. The SWPPP must describe the erosion and sediment control practices and
where required, SMPs that will be used and/or constructed to reduce the
pollutants in stormwater discharges and to assure compliance with the
29
Page 1365 of 1493
Page 1366
Part III.A.3.
requirements of this permit. In addition, the SWPPP must identify potential
sources of pollution which may reasonably be expected to affect the quality of
stormwater discharges.
4. All SWPPPs, that require the SMP component in accordance with Part
III.B.2., must be prepared by a qualified professional.
5. The owner or operator must keep the SWPPP current so that, at all times, it
accurately documents the erosion and sediment control practices that are
being used or will be used during construction, and all SMPs that will be
constructed on the site. At a minimum, the owner or operator must modify the
SWPPP, including construction drawings:
a. whenever the current provisions prove to be ineffective in minimizing
pollutants in stormwater discharges from the site; and
b. whenever there is a change in design, construction, or operation at the
construction site that has or could have an effect on the discharge of
pollutants; and
c. to address issues or deficiencies identified during an inspection by the
qualified inspector, NYSDEC, or other regulatory authority; and
d. to document the final construction conditions in an as-built drawing.
6. NYSDEC may notify the owner or operator at any time that the SWPPP does
not meet one or more of the minimum requirements of this permit. The
notification must be in writing and identify the provisions of the SWPPP that
require modification. Within fourteen (14) calendar days of such notification,
or as otherwise indicated by NYSDEC, the owner or operator must make the
required changes to the SWPPP and submit written notification to NYSDEC
that the changes have been made. If the owner or operator does not respond
to NYSDEC’s comments in the specified time frame, NYSDEC may suspend
the owner’s or operator’s coverage under this permit or require the owner or
operator to obtain coverage under an individual SPDES permit in accordance
with Part II.D.4.
7. Prior to the commencement of construction activity, the owner or operator
must identify the contractor(s) and subcontractor(s) that will be responsible for
installing, constructing, repairing, replacing, inspecting, and maintaining the
erosion and sediment control practices included in the SWPPP and the
30
Page 1366 of 1493
Page 1367
Part III.A.7.
contractor(s) and subcontractor(s) that will be responsible for constructing the
SMPs included in the SWPPP. The owner or operator must have each of the
contractors and subcontractors identify at least one person from their
company to be trained contractor that will be responsible for implementation
of the SWPPP. The owner or operator must ensure that at least one trained
contractor is on site daily when soil disturbance activities are being
performed.
The owner or operator must have each of the contractors and subcontractors
identified above sign a copy of the following certification statement below
before the commencement of construction activities:
"I hereby certify under penalty of law that I understand and agree to
comply with the requirements of the SWPPP and agree to implement any
corrective actions identified by the qualified inspector during a site
inspection. I also understand that the owner or operator must comply with
the requirements of the most current version of the New York State
Pollutant Discharge Elimination System (SPDES) Construction General
Permit (CGP) for Stormwater Discharges from Construction Activities and
that it is unlawful for any person to cause or contribute to a violation of
water quality standards. Furthermore, I am aware that there are significant
penalties for submitting false information, that I do not believe to be true,
including the possibility of fine and imprisonment for knowing violations"
In addition to providing the certification statement above, the certification
page must also identify the specific elements of the SWPPP that each
contractor and subcontractor will be responsible for and include the name and
title of the person providing the signature; the name and title of the trained
contractor responsible for SWPPP implementation; the name, address and
telephone number of the contracting firm; the address (or other identifying
description) of the site; and the date the certification statement is signed. The
owner or operator must attach the certification statement(s) to the copy of the
SWPPP that is maintained at the construction site. If new or additional
contractors are hired to implement measures identified in the SWPPP after
the commencement of construction activities, they must also sign the
certification statement and provide the information listed above prior to
performing construction activities.
31
Page 1367 of 1493
Page 1368
Part III.B.
B. Required SWPPP Contents
1. Erosion and sediment control component - The owner or operator must
prepare a SWPPP that includes erosion and sediment control practices.
a. Erosion and sediment control practices must be designed:
i. in conformance with the BB; or
ii. equivalent to the BB if deviating from Part III.B.1.a.i.
b. If the erosion and sediment control practices are designed in conformance
with Part III.B.1.a.ii., the SWPPP must include a demonstration of
equivalence to the BB.
c. At a minimum, the erosion and sediment control component of the
SWPPP must include the following:
i. Background information about the scope of the project, including
the location, type and size of project; and
ii. A site map/construction drawing(s) with north arrows for the project,
including a general location map. At a minimum, the site map must
show the total site area; all improvements; areas of disturbance;
areas that will not be disturbed; existing vegetation; on-site and
adjacent off-site surface water(s); floodplain/floodway boundaries;
wetlands and drainage patterns that could be affected by the
construction activity; existing and final contours; locations of
different soil types with boundaries; material, waste, borrow or
equipment storage areas located on adjacent properties; and
location(s) of the stormwater discharge(s) and receiving surface
water(s); and
iii. A description of the soil(s) present at the site, including an
identification of the Hydrologic Soil Group (HSG); and
iv. A phasing plan for the project and sequencing plans for all phases,
both of which must address clearing and grubbing, excavation and
grading, utility and infrastructure installation, final stabilization,
32
Page 1368 of 1493
Page 1369
Part III.B.1.c.iv.
and any other construction activity at the site that will result in soil
disturbance.
1. The phasing plan must include:
a. a map delineating and labeling the limits of soil
disturbance for all phases of a project; and
b. a table identifying the order and intended schedule of
when each phase will begin and end its sequencing
plan. The table must identify the total disturbed area
for each phase at any one time and the total disturbed
area for the overall project at any one time all on one
timeline showing all overlapping quantities of
disturbed area at any one time; and
2. A sequencing plan for a specific phase must include:
a. a table indicating the order and intended schedule of
construction activities within a phase, and
corresponding construction drawings with a
description of the work to be performed; and
b. all permanent and temporary stabilization measures;
and
v. A description of the minimum erosion and sediment control
practices to be installed or implemented for each construction
activity that will result in soil disturbance. Include a schedule that
identifies the timing of initial placement or implementation of each
erosion and sediment control practice and the minimum time
frames that each practice should remain in place or be
implemented; and
vi. A site map/construction drawing(s) showing the specific location(s),
size(s), and length(s) of each erosion and sediment control
practice; and
vii. The dimensions, material specifications, installation details, and
operation and maintenance requirements for all erosion and
sediment control practices. Include the location and sizing of any
33
Page 1369 of 1493
Page 1370
Part III.B.1.c.vii.
temporary sediment basins and structural practices that will be
used to divert flows from exposed soils; and
viii. A maintenance inspection schedule for the contractor(s) and
subcontractor(s) identified in Part III.A.7. to ensure continuous and
effective operation of the erosion and sediment control practices.
The maintenance inspection schedule must be in accordance with
the requirements in the BB technical standard; and
ix. A description of the pollution prevention measures that will be used
to control litter, construction chemicals and construction debris from
becoming a pollutant source in the stormwater discharges; and
x. A description and location of any stormwater discharges associated
with industrial activity other than construction at the site, including,
but not limited to, stormwater discharges from asphalt plants and
concrete plants located on the construction site; and
xi. Identification of any elements of the design that are not in
conformance with the design criteria in the BB technical standard.
Include the reason for the deviation or alternative design and
provide information which demonstrates that the deviation or
alternative design is equivalent to the technical standard.
2. SMP component – The owner or operator of construction activity identified in
Table 2 of Appendix B must prepare a SWPPP that includes SMPs.
a. SMPs must be designed in conformance with the applicable sizing criteria
in Part II.C.2.a., c., or d.; and
b. SMPs must be designed in conformance with the performance criteria:
i. in the DM; or
ii. equivalent to the DM if deviating from Part III.B.2.b.i.; or
iii. in the New York State Stormwater Management Design Manual,
dated January 2015 (2015 Design Manual), or equivalent to it, if the
following criteria are met:
34
Page 1370 of 1493
Page 1371
Part III.B.2.b.iii.1.
1. The eNOI is submitted in accordance with Part I.D. before
January 29, 2027 for construction activities that are either:
a. subject to governmental review and approval:
i. where the owner or operator made any
application to that governmental entity prior to
the effective date of this permit; and
ii. such application included a SWPPP developed
using the 2015 Design Manual or equivalent to
it; or
b. not subject to governmental review and approval:
i. where a fiscal allocation for the construction
activities has been developed and approved by
a governmental entity; and
ii. the SWPPP was developed using the 2015
Design Manual or equivalent to it; and
c. If SMPs are designed in conformance with Part III.B.2.b.ii., the SWPPP
must include the reason(s) for the deviation or alternative design and a
demonstration of equivalence to the DM; and
d. If SMPs are designed in conformance with Part III.B.2.b.iii., the SWPPP
must include supporting information or documentation demonstrating that
Part III.B.2.b.iii.1.a. or b. apply; and
e. The SMP component of the SWPPP must include the following:
i. Identification of all SMPs to be constructed as part of the project,
including which option the SMP designs conform to, either Part
III.B.2.b.i., ii., or iii. Include the dimensions, material specifications
and installation details for each SMP; and
ii. A site map/construction drawing(s) showing the specific location
and size of each SMP; and
35
Page 1371 of 1493
Page 1372
Part III.B.2.e.iii.
iii. A Stormwater Modeling and Analysis Report that includes:
(i) Map(s) showing pre-development conditions, including
watershed/subcatchments boundaries, flow
paths/routing, and design points; and
(ii) Map(s) showing post-development conditions, including
watershed/subcatchments boundaries, flow
paths/routing, design points and SMPs; and
(iii) Results of stormwater modeling (i.e. hydrology and
hydraulic analysis) for the required storm events. Include
supporting calculations (model runs), methodology, and a
summary table that compares pre- and post-development
runoff rates and volumes for the different storm events;
and
(iv) Summary table, with supporting calculations, which
demonstrates that each SMP has been designed in
conformance with the sizing criteria included in the DM;
and
(v) Identification of any sizing criteria that is not required
based on the requirements included in Part II.C.; and
(vi) Identification of any elements of the design that are not in
conformance with the performance criteria in the DM.
Include the reason(s) for the deviation or alternative
design and provide information which demonstrates that
the deviation or alternative design is equivalent to the
DM.
iv. Soil testing results and locations (test pits, borings); and
v. Infiltration test results, when required in accordance with Part
III.B.2.a.; and
vi. An operations and maintenance plan that includes inspection and
maintenance schedules and actions to ensure continuous and
effective operation of each SMP. The plan must identify the entity
36
Page 1372 of 1493
Page 1373
Part III.B.2.e.vi.
that will be responsible for the long-term operation and
maintenance of each practice; and
3. Enhanced Phosphorus Removal Standards - The owner or operator of
construction activity identified in Table 2 of Appendix B that is located in a
watershed identified in Appendix C must prepare a SWPPP that includes
SMPs designed in conformance with the applicable sizing criteria in Part
II.C.2.b., c., or d. and the performance criteria Enhanced Phosphorus
Removal Standards included in the DM. At a minimum, the SMP component
of the SWPPP must meet the requirements of Part III.B.2.
C. Required SWPPP Components by Project Type
Owners or operators of construction activities, identified in Table 1 of Appendix
B, are required to prepare a SWPPP that only includes erosion and sediment
control practices designed in accordance with Part III.B.1. Owners or operators of
the construction activities, identified in Table 2 of Appendix B, must prepare a
SWPPP that also includes SMPs designed in accordance with Part III.B.2 or 3.
For the entire area of disturbance, including the entire common plan of
development or sale if applicable, the owner or operator must evaluate every
bullet from Appendix B Table 1 and Table 2 separately. If bullets from both Table
1 and Table 2 apply, the SWPPP must include erosion and sediment control
practices for all construction activities but SMPs for only those portions of the
construction activities that fall under Table 2 bullet(s).
Part IV. Inspection and Maintenance Requirements
A. General Construction Site Inspection and Maintenance Requirements
1. The owner or operator must ensure that all erosion and sediment control
practices (including pollution prevention measures), and all SMPs identified in
the SWPPP, are inspected and maintained in accordance with Part IV.B. and
C.
B. Contractor Maintenance Inspection Requirements
1. The owner or operator of each construction activity, identified in Tables 1 and
2 of Appendix B, must have a trained contractor inspect the erosion and
sediment control practices and pollution prevention measures being
37
Page 1373 of 1493
Page 1374
Part IV.B.1.
implemented within the active work area daily to ensure that they are being
maintained in effective operating condition at all times. If deficiencies are
identified, the contractor must:
a. if the corrective action does not require engineering design:
i. begin implementing corrective actions within one business day; and
ii. complete the corrective actions within five business days; or
b. if the corrective action requires engineering design:
i. begin the engineering design process within five business days;
and
ii. complete the corrective action in a reasonable time frame but no
later than within 60 calendar days.
2. For construction sites where soil disturbance activities have been temporarily
suspended (e.g. winter shutdown) and temporary stabilization measures have
been applied to all disturbed areas, the trained contractor can stop conducting
the maintenance inspections in accordance with Part IV.B.1. The trained
contractor must begin conducting the maintenance inspections in accordance
with Part IV.B.1. as soon as soil disturbance activities resume.
3. For construction sites where soil disturbance activities have been shut down
with partial project completion, the trained contractor can stop conducting the
maintenance inspections in accordance with Part IV.B.1. if all areas disturbed
as of the project shutdown date have achieved final stabilization and all SMPs
required for the completed portion of the project have been constructed in
conformance with the SWPPP and are operational.
C. Qualified Inspector Inspection Requirements
1. With the exception of the following construction activities identified in Tables 1
and 2 of Appendix B, a qualified inspector must conduct site inspections for
all other construction activities identified in Tables 1 and 2 of Appendix B:
a. the construction of a single-family residential subdivision with 25% or less
impervious cover at total site build-out that involves a soil disturbance of
one (1) or more acres of land but less than or equal to five (5) acres and is
38
Page 1374 of 1493
Page 1375
Part IV.C.1.a.
not located in one of the watersheds listed in Appendix C and not directly
discharging to one of the 303(d) segments listed in Appendix D; and
b. the construction of a single-family home that involves soil disturbances of
one (1) or more acres but less than or equal to five (5) acres and is not
located in one of the watersheds listed in Appendix C and not directly
discharging to one of the 303(d) segments listed in Appendix D; and
c. construction on agricultural property that involves soil disturbances of one
(1) or more acres but less than five (5) acres; and
d. construction activities located in the New York City Watershed located
east of the Hudson River, see Appendix C Figure 1, that involve soil
disturbances of 5,000 square feet or more, but less than one acre.
2. The qualified inspector must conduct site inspections in accordance with the
following timetable:
a. For construction sites where soil disturbance activities are on-going, the
qualified inspector must conduct a site inspection at least once every
seven (7) calendar days; or
b. For construction sites where soil disturbance activities are on-going and
the owner or operator has received authorization in accordance with Part
I.E.6. to disturb greater than five (5) acres of soil at any one time, the
qualified inspector must conduct at least two (2) site inspections every
seven (7) calendar days. The two (2) inspections must be separated by a
minimum of two (2) full calendar days; or
c. For construction sites where soil disturbance activities have been
temporarily suspended (e.g. winter shutdown) and temporary stabilization
measures have been applied to all disturbed areas, the qualified inspector
must conduct a site inspection at least once every thirty (30) calendar
days. The owner or operator must notify the DOW Water (SPDES)
Program contact at the Regional Office (see contact information in
Appendix E) or, in areas under the jurisdiction of a Traditional Land Use
Control MS4 Operator, the Traditional Land Use Control MS4 Operator
(provided the Traditional Land Use Control MS4 Operator is not the owner
or operator of the construction activity) by hard copy or email prior to
reducing the inspections to this frequency and again by hard copy or email
prior to re-commencing construction; or
39
Page 1375 of 1493
Page 1376
Part IV.C.2.d.
d. For construction sites where soil disturbance activities have been shut
down with partial project completion, the requirement to have the qualified
inspector conduct inspections ceases if all areas disturbed as of the
project shutdown date have achieved final stabilization and all SMPs
required for the completed portion of the project have been constructed in
conformance with the SWPPP and are operational. The owner or operator
must notify the DOW Water (SPDES) Program contact at the Regional
Office (see contact information in Appendix E) or, in areas subject to the
review authority of Traditional Land Use Control MS4 Operator(s) in
accordance with Part I.D.2.b.ii.1., the Traditional Land Use Control MS4
Operator(s) (provided the Traditional Land Use Control MS4 Operator(s)
are not the owners or operators of the construction activity) in writing prior
to the shutdown and again in writing prior to resuming construction
activity. If soil disturbance activities are not resumed within 2 years from
the date of shutdown, the owner or operator must terminate coverage by
meeting the requirements of Part V; or
e. For construction sites involving soil disturbance of one (1) or more acres
that directly discharge to one of the 303(d) segments listed in Appendix D
or is located in one of the watersheds listed in Appendix C, the qualified
inspector must conduct at least two (2) site inspections every seven (7)
calendar days. The two (2) inspections must be separated by a minimum
of two (2) full calendar days.
3. At a minimum, the qualified inspector must inspect:
a. all erosion and sediment control practices and pollution prevention
measures to ensure integrity and effectiveness; and
b. all SMPs under construction to ensure that they are constructed in
conformance with the SWPPP; and
c. all areas of disturbance that have not achieved final stabilization; and
d. all points of discharge to surface waters of the State located within, or
immediately adjacent to, the property boundaries of the construction site;
and
e. all points of discharge from the construction site.
40
Page 1376 of 1493
Page 1377
Part IV.C.4.
4. The qualified inspector must prepare an inspection report subsequent to each
and every inspection. At a minimum, the inspection report must include and/or
address all of the following, for all construction activities except those listed in
Part IV.C.1.:
a. Permit identification number; and
b. Date and time of inspection; and
c. Name and title of person(s) performing inspection; and
d. A description of the weather and soil conditions (e.g. dry, wet, saturated)
at the time of the inspection, including the temperature at the time of the
inspection; and
e. A description of the condition of the runoff at all points of discharge from
the construction site. This must include identification of any discharges of
sediment from the construction site. Include discharges from conveyance
systems (i.e. pipes, culverts, ditches, etc.) and overland flow; and
f. A description of the condition of all surface waters of the State located
within, or immediately adjacent to, the property boundaries of the
construction site which receive runoff from disturbed areas. This must
include identification of any discharges of sediment to the surface waters
of the State; and
g. Identification of all erosion and sediment control practices and pollution
prevention measures that need repair or maintenance; and
h. Identification of all erosion and sediment control practices and pollution
prevention measures that were not installed properly or are not functioning
as designed and need to be reinstalled or replaced; and
i. Description and sketch (map) of areas with active soil disturbance activity,
areas that have been disturbed but are inactive at the time of the
inspection, and areas that have been stabilized (temporary and/or final)
since the last inspection; and
j. Estimates, in square feet or acres, of the following areas:
41
Page 1377 of 1493
Page 1378
Part IV.C.4.j.i.
i. Total area with active soil disturbance (not requiring either
temporary stabilization or final stabilization); and
ii. Total area with inactive soil disturbance (requiring either temporary
stabilization or final stabilization); and
iii. Total area that has achieved temporary stabilization; and
iv. Total area that has achieved final stabilization; and
k. Current stage of construction of all SMPs and identification of all
construction activity on site that is not in conformance with the SWPPP
and technical standards; and
l. Corrective action(s) that must be taken to install, repair, replace or
maintain erosion and sediment control practices and pollution prevention
measures; and to correct deficiencies identified with the construction of
the SMP(s); and
m. Identification and status of all corrective actions that were required by
previous inspection; and
n. Digital photographs, with date stamp, that clearly show the condition of all
practices that have been identified as needing corrective actions. The
qualified inspector must attach color copies of the digital photographs to
the inspection report being maintained onsite within seven (7) calendar
days of the date of the inspection. The qualified inspector must also take
digital photographs, with date stamp, that clearly show the condition of the
practice(s) after the corrective action has been completed. The qualified
inspector must attach paper color copies of the digital photographs to the
inspection report that documents the completion of the corrective action
work within seven (7) calendar days of that inspection.
5. Within one business day of the completion of an inspection, the qualified
inspector must notify the owner or operator, and appropriate contractor or
subcontractor identified in Part III.A.7., of any corrective actions that need to
be taken. The contractor or subcontractor must:
a. if the corrective action does not require engineering design:
42
Page 1378 of 1493
Page 1379
Part IV.C.5.a.i.
i. begin implementing corrective actions within one business day; and
ii. complete the corrective actions within five business days; or
b. if the corrective action requires engineering design:
i. begin the engineering design process within five business days;
and
ii. complete the corrective action in a reasonable time frame but no
later than within 60 calendar days.
6. All inspection reports must be signed by the qualified inspector. In
accordance with Part I.E.3., the inspection reports must be maintained on site
with the SWPPP.
Part V. How to Terminate CGP Coverage
A. Electronic Notice of Termination (eNOT) Submittal
The eNOT contains questions to ensure requirements in Part V.A. have been
met.
1. An owner or operator must terminate coverage when one or more of the
following requirements have been met:
a. Total project completion:
i. all construction activity identified in the SWPPP has been
completed; and
ii. all areas of disturbance have achieved final stabilization; and
iii. all temporary, structural erosion and sediment control measures
have been removed; and
iv. all SMPs have been constructed in conformance with the SWPPP
and are operational; and
v. an as-built drawing has been prepared; or
43
Page 1379 of 1493
Page 1380
Part V.A.1.b.
b. Planned shutdown with partial project completion:
i. all soil disturbance activities have ceased; and
ii. all areas disturbed as of the project shutdown date have achieved
final stabilization; and
iii. all temporary, structural erosion and sediment control measures
have been removed; and
iv. all SMPs required for the completed portion of the project have
been constructed in conformance with the SWPPP and are
operational; and
v. an as-built drawing has been prepared; or
c. In accordance with Part I.G. Change of Owner or Operator; or
d. The owner or operator has obtained coverage under an alternative
general SPDES permit or an individual SPDES permit.
2. For construction activities that require qualified inspector inspections in
accordance with Part IV.C.1. and have met Part V.A.1.a. or b., the owner or
operator must have the qualified inspector perform a final site inspection prior
to submitting the eNOT. The qualified inspector must, by signing the “Final
Stabilization” and “Post-Construction Stormwater Management Practice(s)”
certification statements on the eNOT, certify that all the requirements in Part
V.A.1.a. or b. have been achieved.
3. For construction activities that are subject to the review authority of
Traditional Land Use Control MS4 Operator(s) in accordance with Part
I.D.2.b.ii.1. and meet Part V.A.1.a. or b., the owner or operator must have the
Traditional Land Use Control MS4 Operator(s) sign the “MS4 Acceptance”
statement on the eNOT in accordance with the requirements in Part VII.J. A
Traditional Land Use Control MS4 Operator official, by signing this statement,
determined that it is acceptable for the owner or operator to submit the eNOT
in accordance with the requirements of this Part. A Traditional Land Use
Control MS4 Operator can make this determination by performing a final site
inspection themselves or by accepting the qualified inspector’s final site
inspection certification(s) when required in Part V.A.2.
44
Page 1380 of 1493
Page 1381
Part V.A.4.
4. For construction activities that require SMPs and meet Part V.A.1.a. or b., the
owner or operator must, prior to submitting the eNOT, ensure one of the
following:
a. for SMP(s) that were constructed by a private entity, but will be owned,
operated, and maintained by a public entity, the SMP(s) and any right-of-
way(s) needed to operate and maintain such practice(s) have been
deeded to the municipality in which the practice(s) is located; or
b. for SMP(s) that are privately owned, but will be operated and maintained
by a public entity, an executed operation and maintenance agreement is in
place with the municipality that will operate and maintain the SMP(s); or
c. for SMP(s) that are privately owned, the owner or operator has a
mechanism in place that requires operation and maintenance of the
practice(s) in accordance with the operation and maintenance plan, such
as a deed covenant in the owner or operator’s deed of record; or
d. for SMP(s) that are owned by a public or private institution (e.g. school,
university, hospital), government agency or authority, or public utility, the
owner or operator has policies and procedures in place that ensure
operation and maintenance of the practices in accordance with the
operation and maintenance plan.
5. An owner or operator that has met the requirements of Part V.A.1., 2., 3., and 4.
must request termination of coverage under this permit by submitting a complete
Notice of Termination form electronically using a NYSDEC approved form. 5
a. The owner’s or operator’s coverage is terminated as of the termination
date indicated in the Letter of Termination (LOT), which is sent by
NYSDEC after a complete eNOT is submitted.
5 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or (d). All waiver requests must
be submitted to [email protected] or NYSDEC, Bureau of Water Permits, 625 Broadway, 4th
Floor, Albany, New York 12233-3505.
45
Page 1381 of 1493
Page 1382
Part VI.
Part VI. Record Retention and Reporting
A. Record Retention
The owner or operator must retain a copy of the documents listed in Part I.E.3. and a
copy of the LOT for a period of at least five years from the date that NYSDEC
accepts a complete NOT submitted in accordance with Part V.
B. Reporting
Except for the eNOI, the signature forms associated with the eNOI, and the eNOT,
all other written correspondence requested by NYSDEC, including individual permit
applications, must be sent to the address of the appropriate DOW (SPDES) Program
contact at the Regional Office listed in Appendix E.
Part VII. Standard Permit Requirements
For the purposes of this permit, examples of contractors and subcontractors include:
third-party maintenance and construction contractors.
A. Duty to Comply
The owner or operator, and all contractors or subcontractors, must comply with all
requirements of this permit. Any non-compliance with the requirements of this permit
constitutes a violation of the New York State Environmental Conservation Law
(ECL), and its implementing regulations, and is grounds for enforcement action.
Filing of a request for termination of coverage under this permit, or a notification of
planned changes or anticipated non-compliance, does not limit, diminish or stay
compliance with any requirements of this permit.
B. Need to Halt or Reduce Activity Not a Defense
The necessity to halt or reduce the construction activity regulated by this permit, in
order to maintain compliance with the requirements of this permit, must not be a
defense in an enforcement action.
C. Penalties
There are substantial criminal, civil, and administrative penalties associated with
violating the requirements of this permit. Fines of up to $37,500 per day for each
46
Page 1382 of 1493
Page 1383
Part VII.C.
violation and imprisonment for up to 15 years may be assessed depending upon the
nature and degree of the offense.
D. False Statements
Any person who knowingly makes any false material statement, representation, or
certification in any application, record, report, or other document filed or required to
be maintained under this permit, including monitoring reports or reports of
compliance or noncompliance must, upon conviction, be punished in accordance
with ECL §71-1933 and or New York State Penal Law Articles 175 and 210.
E. Re-Opener Clause
Upon issuance of this permit, a determination has been made on the basis of a
submitted Notice of Intent, plans, or other available information, that compliance with
the specified permit requirements will reasonably protect classified water use and
assure compliance with applicable water quality standards. Satisfaction of the
requirements of this permit notwithstanding, if operation pursuant to this permit
causes or contributes to a condition in contravention of State water quality standards
or guidance values, or if NYSDEC determines that a modification is necessary to
prevent impairment of the best use of the waters or to assure maintenance of water
quality standards or compliance with other provisions of ECL Article 17 or the Clean
Water Act (CWA), or any regulations adopted pursuant thereto, NYSDEC may
require such modification and the Commissioner may require abatement action to be
taken by the owner or operator and may also prohibit such operation until the
modification has been implemented.
F. Duty to Mitigate
The owner or operator, and its contractors and subcontractors, must take all
reasonable steps to minimize or prevent any discharge in violation of this permit
which has a reasonable likelihood of adversely affecting human health or the
environment.
G. Requiring Another General Permit or Individual SPDES Permit
NYSDEC may require any owner or operator authorized to discharge in accordance
with this permit to apply for and obtain an individual SPDES permit or apply for
authorization to discharge in accordance with another general SPDES permit.
1. Cases where an individual SPDES permit or authorization to discharge in
accordance with another general SPDES permit may be required include, but is
not limited to the following:
47
Page 1383 of 1493
Page 1384
Part VII.G.1.a.
a. the owner or operator is not in compliance with the conditions of this
permit or does not meet the requirements for coverage under this permit;
and
b. a change has occurred in the availability of demonstrated technology or
practices for the control or abatement of pollutants applicable to the point
source; and
c. new effluent limitation guidelines or new source performance standards
are promulgated that are applicable to point sources authorized to
discharge in accordance with this permit; and
d. existing effluent limitation guidelines or new source performance
standards that are applicable to point sources authorized to discharge in
accordance with this permit are modified; and
e. a water quality management plan containing requirements applicable to
such point sources is approved by NYSDEC; and
f. circumstances have changed since the time of the request to be covered
so that the owner or operator is no longer appropriately controlled under
this permit, or either a temporary or permanent reduction or elimination of
the authorized discharge is necessary; and
g. the discharge is in violation of section 17-0501 of the ECL; and
h. the discharge(s) is a significant contributor of pollutants. In making this
determination, NYSDEC may consider the following factors:
i. the location of the discharge(s) with respect to surface waters of the
State; and
ii. the size of the discharge(s); and
iii. the quantity and nature of the pollutants discharged to surface
waters of the State; and
iv. other relevant factors including compliance with other provisions of
ECL Article 17, or the CWA.
2. When NYSDEC requires any owner or operator authorized by this permit to apply
for an individual SPDES permit as provided for in this subdivision, it must notify
the owner or operator in writing that a permit application is required. This notice
must include a brief statement of the reasons for this decision, an application
48
Page 1384 of 1493
Page 1385
Part VII.G.2.
form, a statement setting a time for the owner or operator to file the application
for an individual SPDES permit, and a deadline, not sooner than 180 days from
the owner’s or operator's receipt of the notification letter, whereby the
authorization to discharge under this permit must be terminated. NYSDEC may
grant additional time upon demonstration, to the satisfaction of the RWE, 6 that
additional time to apply for an alternative authorization is necessary or where
NYSDEC has not provided a permit determination in accordance with 6 NYCRR
Part 621.
3. When an individual SPDES permit is issued to an owner or operator authorized
to discharge under this permit for the same discharge(s), this permit authorization
for construction activities authorized under the individual SPDES permit is
automatically terminated on the effective date of the individual SPDES permit
unless termination is earlier in accordance with 6 NYCRR Part 750.
H. Duty to Provide Information
The owner or operator must furnish to NYSDEC, within five business days,
unless otherwise set forth by NYSDEC, any information that NYSDEC may request
to determine whether cause exists to determine compliance with this permit or to
determine whether cause exists for requiring an individual SPDES permit in
accordance with 6 NYCRR 750-1.21(e) (see Part VII.G. Requiring Another General
Permit or Individual Permit).
The owner or operator must make available to NYSDEC, for inspection and copying,
or furnish to NYSDEC within 25 business days of receipt of a NYSDEC request for
such information, any information retained in accordance with this permit.
Except for Part I.D.4. and 5. and Part I.G., the following applies: where the owner or
operator becomes aware that it failed to submit any relevant facts on the Notice of
Intent, or submitted incorrect information in a Notice of Intent or in any report to
NYSDEC, the owner or operator must submit such facts or corrected information to
NYSDEC within five business days.
I. Extension
In the event a new permit is not issued and effective prior to the expiration of this
permit, and this permit is extended pursuant to the State Administrative Procedure
Act and 6 NYCRR Part 621, then the owner or operator with coverage under this
permit may continue to operate and discharge in accordance with the requirements
of this permit until a new permit is issued and effective.
6 The Regional Water Manager where a DEC Region does not have a RWE.
49
Page 1385 of 1493
Page 1386
Part VII.J.
J. Signatories and Certification
The Notice of Intent, Notice of Termination, and reports required by this permit must
be signed as provided in 40 CFR §122.22.
1. All Notices of Intent and Notices of Termination must be signed as follows:
a. For a corporation. By a responsible corporate officer. For the purpose of
this section, a responsible corporate officer means:
(i) a president, secretary, treasurer, or vice-president of the corporation
in charge of a principal business function, or any other person who
performs similar policy- or decision-making functions for the
corporation; or
(ii) the manager of one or more manufacturing, production or operating
facilities, provided, the manager is authorized to make management
decisions which govern the operation of the regulated facility
including having the explicit or implicit duty of making major capital
investment recommendations, and initiating and directing other
comprehensive measures to assure long term environmental
compliance with environmental laws and regulations; the manager
can ensure that the necessary systems are established or actions
taken to gather complete and accurate information for Notice of Intent
or Notice of Termination requirements; and where authority to sign
documents has been assigned or delegated to the manager in
accordance with corporate procedures.
Note: NYSDEC does not require specific assignments or delegations of
authority to responsible corporate officers identified in 40 CFR
§122.22(a)(1)(i). NYSDEC will presume that these responsible corporate
officers have the requisite authority to sign the Notice of Intent or Notice of
Termination unless the corporation has notified NYSDEC to the contrary.
Corporate procedures governing authority to sign a Notice of Intent or
Notice of Termination may provide for assignment or delegation to
applicable corporate positions under 40 CFR §122.22(a)(1)(ii) rather than
to specific individuals.
b. For a partnership or sole proprietorship. By a general partner or the
proprietor, respectively.
50
Page 1386 of 1493
Page 1387
Part VII.J.1.c.
c. For a municipality, State, Federal, or other public agency. By either a
principal executive officer or ranking elected official. For purposes of this
section, a principal executive officer of a Federal agency includes:
1. the chief executive officer of the agency; or
2. a senior executive officer having responsibility for the overall
operations of a principal geographic unit of the agency (e.g.,
Regional Administrators of EPA).
2. All reports required by this permit, and other information requested by
NYSDEC, must be signed by a person described in Part VII.J.1., or by a duly
authorized representative of that person. A person is a duly authorized
representative only if:
a. The authorization is made in writing by a person described in Part VII.J.1.
or using the Duly Authorized Form, found on the DEC website; and
b. The authorization specifies either an individual or a position having
responsibility for the overall operation of the regulated facility or activity,
position of equivalent responsibility, or an individual or position having
overall responsibility for environmental matters for the company. (A duly
authorized representative may thus be either a named individual or any
individual occupying a named position); and
c. The written authorization is submitted to NYSDEC.
3. Changes to authorization. If an authorization under Part VII.J.2. is no longer
accurate because a different individual or position has responsibility for the
overall operation of the construction activity, a new authorization satisfying
the requirements of Part VII.J.2. must be submitted to NYSDEC prior to or
together with any reports, information, or applications to be signed by an
authorized representative.
4. Certification. Any person signing a document under Part VII.J.1. or 2. must
make the following certification:
I certify under penalty of law that this document and all attachments were
prepared under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who
51
Page 1387 of 1493
Page 1388
Part VII.J.4.
manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
5. Electronic reporting. If documents described in Part VII.J.1. or 2. are
submitted electronically by or on behalf of the construction activity with
coverage under this permit, any person providing the electronic signature for
such documents must meet all relevant requirements of this section, and
must ensure that all of the relevant requirements of 40 CFR Part 3 (including,
in all cases, subpart D to Part 3) (Cross-Media Electronic Reporting) and 40
CFR Part 127 (NPDES Electronic Reporting Requirements) are met for that
submission.
K. Inspection and Entry
The owner or operator must allow NYSDEC, the USEPA Regional Administrator, the
applicable county health department, or any authorized representatives of those
entities, or, in the case of a construction site which discharges through an MS4, an
authorized representative of the MS4 receiving the discharge, upon the presentation
of credentials and other documents as may be required by law, to:
1. enter upon the owner’s or operator's premises where a regulated facility or
activity is located or conducted or where records must be kept under the
requirements of this permit; and
2. have access to and copy at reasonable times, any records that must be kept
under the requirements of this permit, including records required to be
maintained for purposes of operation and maintenance; and
3. inspect at reasonable times any facilities, equipment (including monitoring
and control equipment), practices or operations regulated or required under
this permit; and
4. sample or monitor at reasonable times, for the purposes of assuring general
SPDES permit compliance or as otherwise authorized by the CWA or ECL,
any substances or parameters at any location; and
5. enter upon the property of any contributor to the regulated facility or activity
under authority of the owner or operator.
52
Page 1388 of 1493
Page 1389
Part VII.L.
L. Confidentiality of Information
The following must not be held confidential: this permit, the fact sheet for this permit,
the name and address of any owner or operator, effluent data, the Notice of Intent,
and information regarding the need to obtain an individual permit or an alternative
general SPDES permit. This includes information submitted on forms themselves
and any attachments used to supply information required by the forms (except
information submitted on usage of substances). Upon the request of the owner or
operator, NYSDEC must make determinations of confidentiality in accordance with 6
NYCRR Part 616, except as set forth in the previous sentence. Any information
accorded confidential status must be disclosed to the Regional Administrator upon
his or her written request. Prior to disclosing such information to the Regional
Administrator, NYSDEC will notify the Regional Administrator of the confidential
status of such information.
M. Other Permits May Be Required
Nothing in this permit relieves the owner or operator from a requirement to obtain
any other permits required by law.
N. NYSDEC Orders or Civil Decrees/Judgments
The issuance of this permit by the NYSDEC, and the coverage under this permit by
the owner or operator, does not supersede, revoke, or rescind any existing order on
consent or civil Decree/Judgment, or modification to any such documents or to any
order issued by the Commissioner, or any of the terms, conditions, or requirements
contained in such order or modification therefore, unless expressly noted.
O. Property Rights
Coverage under this permit does not convey any property rights in either real or
personal property, or any exclusive privileges, nor does it authorize any injury to
private property or any invasion of personal rights, nor any infringement of Federal,
State, or local laws or regulations, nor does it obviate the necessity of obtaining the
assent of any other jurisdiction as required by law for the discharge authorized.
P. Compliance with Interstate Standards
If the construction activity covered by this permit originates within the jurisdiction of
an interstate water pollution control agency, then the construction activity must also
comply with any applicable effluent standards or water quality standards
promulgated by that interstate agency and as set forth in this permit for such
construction activities.
53
Page 1389 of 1493
Page 1390
Part VII.Q.
Q. Oil and Hazardous Substance Liability
Coverage under this permit does not affect the imposition of responsibilities upon, or
the institution of any legal action against, the owner or operator under section 311 of
the CWA, which must be in conformance with regulations promulgated pursuant to
section 311 governing the applicability of section 311 of the CWA to discharges from
facilities with NPDES permits, nor must such issuance preclude the institution of any
legal action or relieve the owner or operator from any responsibilities, liabilities, or
penalties to which the owner or operator is or may be subject pursuant to the
Comprehensive Environmental Response, Compensation and Liability Act of 1980,
42 U.S.C. section 9601 et seq. (CERCLA).
R. Severability
The provisions of this permit are severable, and if any provision of this permit, or the
application of any provision of this permit to any circumstance, is held invalid, the
application of such provision to other circumstances, and the remainder of this
permit, must not be affected thereby.
S. NYSDEC Approved Forms
The owner or operator must provide all relevant information that is requested by
NYSDEC, and required by this permit, on all NYSDEC approved forms.
54
Page 1390 of 1493
Page 1391
Appendix A
APPENDIX A – Abbreviations and Definitions
Abbreviations
APO – Agency Preservation Officer
BB – New York State Standards and Specifications for Erosion and Sediment Control
(Blue Book), dated November 2016
BMP – Best Management Practice
CPESC – Certified Professional in Erosion and Sediment Control
CPv – Channel Protection Volume
CWA – Clean Water Act (or the Federal Water Pollution Control Act, 33 U.S.C. §1251 et
seq)
DM – New York State Stormwater Management Design Manual (Design Manual), dated
July 31, 2024
DOW – Division of Water
EAF – Environmental Assessment Form
ECL – chapter 43-B of the Consolidated Laws of the State of New York, entitled the
Environmental Conservation Law
EPA – U.S. Environmental Protection Agency
HSG – Hydrologic Soil Group
MS4 – Municipal Separate Storm Sewer System
NOI – Notice of Intent
NOT – Notice of Termination
NPDES – National Pollutant Discharge Elimination System
NYC – The City of New York
NYCDEP – The City of New York Department of Environmental Protection
NYSDEC – The New York State Department of Environmental Conservation
OPRHP – Office of Parks, Recreation and Historic Places
Qf – Extreme Flood
Qp – Overbank Flood
RR – Runoff Reduction
RRv – Runoff Reduction Volume
RWE – Regional Water Engineer
SEQR – State Environmental Quality Review Act
SHPA – State Historic Preservation Act
SMP – Post-Construction Stormwater Management Practice
SPDES – State Pollutant Discharge Elimination System
SWPPP – Stormwater Pollution Prevention Plan
TMDL – Total Maximum Daily Load
UPA – Uniform Procedures Act
USDA – United States Department of Agriculture
WQv – Water Quality Volume
55
Page 1391 of 1493
Page 1392
Appendix A
Definitions
All definitions in this section are solely for the purposes of this permit. If a word is not
italicized in the permit, use its common definition.
Agricultural Building – a structure designed and constructed to house farm
implements, hay, grain, poultry, livestock or other horticultural products; excluding any
structure designed, constructed or used, in whole or in part, for human habitation, as a
place of employment where agricultural products are processed, treated or packaged,
or as a place used by the public.
Agricultural Property – the land for construction of a barn, agricultural building, silo,
stockyard, pen or other structural practices identified in Table II in the “Agricultural Best
Management Practice Systems Catalogue” (dated June 2023).
Alter Hydrology from Pre- to Post-Development Conditions – the post-development
peak flow rate(s) has increased by more than 5% of the pre-developed condition for the
design storm of interest (e.g. 10 yr and 100 yr).
Combined Sewer System – a sewer system which conveys sewage and stormwater
through a single pipe system to a publicly owned treatment works.
Commence (Commencement of) Construction Activities – the initial disturbance of
soils associated with clearing, grading or excavation activities; or other construction
related activities that disturb or expose soils such as demolition, stockpiling of fill
material, and the initial installation of erosion and sediment control practices required in
the SWPPP. See definition for “Construction Activity(ies)” also.
Common Plan of Development or Sale – a contiguous area where multiple separate
and distinct construction activities are occurring, or may occur, under one plan. The
“common plan” of development or sale is broadly defined as any announcement or
piece of documentation (including a sign, public notice or hearing, marketing plan,
advertisement, drawing, permit application, State Environmental Quality Review Act
(SEQR) environmental assessment form or other documents, zoning request, computer
design, etc.) or physical demarcation (including boundary signs, lot stakes, surveyor
markings, etc.) indicating construction activities may occur on a specific plot. A common
plan of development or sale is comprised of two or more phases.
Common plan of development or sale does not include separate and distinct
construction activities that are occurring, or may occur, under one plan that are at least
1/4 mile apart provided any interconnecting road, pipeline or utility project that is part of
the same “common plan” is not concurrently being disturbed.
56
Page 1392 of 1493
Page 1393
Appendix A
Construction Activity(ies) – identified within 40 CFR 122.26(b)(14)(x),
122.26(b)(15)(i), and 122.26(b)(15)(ii), any clearing, grading, excavation, filling,
demolition or stockpiling activities that result in soil disturbance. Clearing activities can
include, but are not limited to, mechanized logging equipment operation, the cutting and
skidding of trees, stump removal and/or brush root removal.
Construction activity does not include routine maintenance that is performed to maintain
the original line and grade, hydraulic capacity, or original purpose of a facility, which is
excluded from the calculation of the soil disturbance for a project. Routine maintenance
includes, but is not limited to:
Re-grading of gravel roads or parking lots; and
Cleaning and shaping of existing roadside ditches and culverts that maintains
the approximate original line and grade, and maintains or improves the
hydraulic capacity of the ditch; and
Replacement of existing culverts that maintains the approximate original line
and grade, and maintains or improves the hydraulic capacity of a ditch; and
Replacement of existing bridges that maintains the approximate original line
and grade, and maintains or improves the hydraulic capacity beneath the
bridges; and
Cleaning and shaping of existing roadside ditches that does not maintain the
approximate original grade, hydraulic capacity and purpose of the ditch if the
changes to the line and grade, hydraulic capacity or purpose of the ditch are
installed to improve water quality and quantity controls (e.g. installing grass
lined ditch); and
Placement of aggregate shoulder backing that stabilizes the transition between
the road shoulder and the ditch or embankment; and
Full depth milling and filling of existing asphalt pavements, replacement of
concrete pavement slabs, and similar work that does not expose soil or disturb
the bottom six (6) inches of subbase material; and
Long-term use of equipment storage areas at or near highway maintenance
facilities; and
Removal of sediment from the edge of the highway to restore a previously
existing sheet-flow drainage connection from the highway surface to the
highway ditch or embankment; and
Existing use of Canal Corp owned upland disposal sites for the canal, and
Replacement of curbs, gutters, sidewalks and guide rail posts; and
Maintenance of ski trails including brush hog use and mowing; and
Above ground snowmaking pipe replacement; and
Replacement of existing utility poles; etc.
Construction Site – the land area where construction activity(ies) will occur. See also
the definitions for “Commence (Commencement of) Construction Activities” and
“Common Plan of Development or Sale.”
57
Page 1393 of 1493
Page 1394
Appendix A
Dewatering – the act of draining rainwater and/or groundwater from building
foundations, vaults or excavations/trenches.
Directly Discharge(s)(ing) (to a specific surface waterbody) – runoff flows from a
construction site by overland flow and the first point of discharge is the specific surface
waterbody, or runoff flows from a construction site to a separate storm sewer system
and the first point of discharge from the separate storm sewer system is the specific
surface waterbody.
Discharge(s)(d) – any addition of any pollutant to waters of the State through an outlet
or point source.
Embankment – an earthen or rock slope that supports a road/highway.
Equivalent (Equivalence) – the practice or measure meets all the performance,
longevity, maintenance, and safety objectives of the technical standard and will provide
an equal or greater degree of water quality protection.
Final Stabilization – all soil disturbance activities have ceased and a uniform, perennial
vegetative cover with a density of eighty (80) percent over the entire pervious surface
has been established; or other equivalent stabilization measures, such as permanent
landscape mulches, rock rip-rap or washed/crushed stone have been applied on all
disturbed areas that are not covered by permanent structures, concrete or pavement.
Historic Property – any building, structure, site, object or district that is listed on the
State or National Registers of Historic Places or is determined to be eligible for listing on
the State or National Registers of Historic Places.
Impervious Area (Cover) – all impermeable surfaces that cannot effectively infiltrate
rainfall. This includes paved, concrete and compacted gravel surfaces (i.e. parking lots,
driveways, roads, runways and sidewalks); building rooftops and miscellaneous
impermeable structures such as patios, pools, and sheds.
Infeasible – not technologically possible, or not economically practicable and
achievable considering best industry practices.
Minimize(ing)(ation) – reduce and/or eliminate to the extent achievable using control
measures (including best management practices) that are technologically available and
economically practicable and achievable in light of best industry practices.
Municipal Separate Storm Sewer System (MS4) - a conveyance or system of
conveyances (including roads with drainage systems, municipal streets, catch basins,
curbs, gutters, ditches, man-made channels, or storm drains):
58
Page 1394 of 1493
Page 1395
Appendix A
1. owned or operated by a State, city, town, village, borough, county, parish,
district, association, or other public body (created by or pursuant to State
law) having jurisdiction over disposal of sewage, industrial wastes,
stormwater, or other wastes, including special districts under State law such
as a sewer district, flood control district or drainage district, or similar entity,
or an Indian tribe or an authorized Indian tribal organization, or a designated
and approved management agency under section 208 of the CWA, that
discharges to surface waters of the State; and
2. designed or used for collecting or conveying stormwater; and
3. which is not a combined sewer system; and
4. which is not part of a Publicly Owned Treatment Works (POTW) as defined
at 40 CFR 122.2.
Natural Buffer(s) – an undisturbed area with natural cover running along a surface
water (e.g. wetland, stream, river, lake, etc.).
New Development – any land disturbance that does not meet the definition of
Redevelopment Activity included in this appendix.
New York State Erosion and Sediment Control Certificate Program – a certificate
program that establishes and maintains a process to identify and recognize individuals
who are capable of developing, designing, inspecting and maintaining erosion and
sediment control plans on projects that disturb soils in New York State. The certificate
program is administered by the New York State Conservation District Employees
Association.
Nonpoint Source(s) – any source of water pollution or pollutants which is not a discrete
conveyance or point source permitted pursuant to Title 7 or 8 of Article 17 of the
Environmental Conservation Law (see ECL Section 17-1403).
Overbank – flow events that exceed the capacity of the stream channel and spill out
into the adjacent floodplain.
Owner or Operator – the person, persons, or legal entity which owns or leases the
property on which the construction activity is occurring; an entity that has operational
control over the construction plans and specifications, including the ability to make
modifications to the plans and specifications; and/or an entity that has day-to-day
operational control of those activities at a project that are necessary to ensure
compliance with the permit requirements.
59
Page 1395 of 1493
Page 1396
Appendix A
Performance Criteria – the six performance criteria for each group of SMPs in
Chapters 5 and 6 of the technical standard, New York State Stormwater Management
Design Manual (DM), dated July 31, 2024. These include feasibility, conveyance,
pretreatment, treatment, landscaping, and maintenance. It does not include the Sizing
Criteria (i.e. WQv, RRv, CPv, Qp and Qf) in Part I.C.2. of the permit.
Phase – a defined area in which construction activities are occurring or will occur
separate from other defined area(s).
Point Source – any discernible, confined, and discrete conveyance, including but
not limited to any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container,
rolling stock, concentrated animal feeding operation, vessel or other floating craft, or
landfill leachate collection system from which pollutants are or may be discharged.
Pollutant(s) – dredged spoil, filter backwash, solid waste, incinerator residue, sewage,
garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive
materials, heat, wrecked or discarded equipment, rock, sand and industrial, municipal,
agricultural waste and ballast discharged into water; which may cause or might
reasonably be expected to cause pollution of the waters of the state in contravention of
the standards or guidance values adopted as provided in 6 NYCRR Parts 700 et seq.
Qualified Inspector – a person that is knowledgeable in the principles and practices of
erosion and sediment control, such as a licensed Professional Engineer, Certified
Professional in Erosion and Sediment Control (CPESC), Registered Landscape
Architect, New York State Erosion and Sediment Control Certificate Program holder or
other NYSDEC endorsed individual(s).
It can also mean someone working under the direct supervision of, and at the same
company as, the licensed Professional Engineer or Registered Landscape Architect,
provided that person has training in the principles and practices of erosion and sediment
control. Training in the principles and practices of erosion and sediment control means
that the individual working under the direct supervision of the licensed Professional
Engineer or Registered Landscape Architect has received four (4) hours of NYSDEC
endorsed training in proper erosion and sediment control principles from a Soil and
Water Conservation District, or other NYSDEC endorsed entity. After receiving the initial
training, the individual working under the direct supervision of the licensed Professional
Engineer or Registered Landscape Architect shall receive four (4) hours of training
every three (3) years.
It can also mean a person that meets the Qualified Professional qualifications in
addition to the Qualified Inspector qualifications.
Note: Inspections of any SMPs that include structural components, such as a dam for
an impoundment, shall be performed by a licensed Professional Engineer.
60
Page 1396 of 1493
Page 1397
Appendix A
Qualified Professional – a person that is knowledgeable in the principles and practices
of stormwater management and treatment, such as a licensed Professional Engineer,
Registered Landscape Architect or other NYSDEC endorsed individual(s). Individuals
preparing SWPPPs that require the SMP component must have an understanding of the
principles of hydrology, water quality management practice design, water quantity
control design, and, in many cases, the principles of hydraulics. All components of the
SWPPP that involve the practice of engineering, as defined by the NYS Education Law
(see Article 145), shall be prepared by, or under the direct supervision of, a professional
engineer licensed to practice in the State of New York.
Redevelopment Activity(ies) – the disturbance and reconstruction of existing
impervious area, including impervious areas that were removed from a project site
within five (5) years of preliminary project plan submission to the local government (i.e.
site plan, subdivision, etc.).
Renewable Energy – electricity or thermal energy generated by renewable energy
systems through use of the following technologies: solar thermal, photovoltaics, on land
and offshore wind, hydroelectric, geothermal electric, geothermal ground source heat,
tidal energy, wave energy, ocean thermal, and fuel cells which do not utilize a fossil fuel
resource in the process of generating electricity.
Site Limitations – site conditions that prevent the use of an infiltration technique and or
infiltration of the total WQv. Typical site limitations include: seasonal high groundwater,
shallow depth to bedrock, and soils with an infiltration rate less than 0.5 inches/hour.
The existence of site limitations shall be confirmed and documented using actual field
testing (i.e. test pits, soil borings, and infiltration test) or using information from the most
current United States Department of Agriculture (USDA) Soil Survey for the County
where the project is located.
Sizing Criteria – the criteria included in Part I.C.2 of the permit that are used to size
SMPs. The criteria include; Water Quality Volume (WQv), Runoff Reduction Volume
(RRv), Channel Protection Volume (Cpv), Overbank Flood (Qp), and Extreme Flood
(Qf).
Steep Slope – land area designated on the current United States Department of
Agriculture (USDA) Soil Survey as Soil Slope Phase D, (provided the map unit name or
description is inclusive of slopes greater than 25%), or Soil Slope Phase E or F,
(regardless of the map unit name), or a combination of the three designations.
Stormwater – that portion of precipitation that, once having fallen to the ground, is in
excess of the evaporative or infiltrative capacity of soils, or the retentive capacity of
surface features, which flows or will flow off the land by surface runoff to waters of the
State.
61
Page 1397 of 1493
Page 1398
Appendix A
Streambank – the terrain alongside the bed of a creek or stream. The bank consists of
the sides of the channel, between which the flow is confined.
Stormwater Pollution Prevention Plan (SWPPP) – a project specific report, including
construction drawings, that among other things: describes the construction activity(ies),
identifies the potential sources of pollution at the construction site; describes and shows
the stormwater controls that will be used to control the pollutants (i.e. erosion and
sediment controls; for many projects, includes SMPs); and identifies procedures the
owner or operator will implement to comply with the requirements of the permit. See
Part III of the permit for a complete description of the information that must be included
in the SWPPP.
Surface Waters of the State – shall be construed to include lakes, bays, sounds,
ponds, impounding reservoirs, springs, rivers, streams, creeks, estuaries, marshes,
inlets, canals, the Atlantic ocean within the territorial seas of the state of New York and
all other bodies of surface water, natural or artificial, inland or coastal, fresh or salt,
public or private (except those private waters that do not combine or effect a junction
with natural surface waters), which are wholly or partially within or bordering the state or
within its jurisdiction. Waters of the state are further defined in 6 NYCRR Parts 800 to
941.
Temporarily Ceased – an existing disturbed area will not be disturbed again within 14
calendar days of the previous soil disturbance.
Temporary Stabilization – exposed soil has been covered with material(s) as set forth
in the technical standard, New York Standards and Specifications for Erosion and
Sediment Control, to prevent the exposed soil from eroding. The materials can include,
but are not limited to, mulch, seed and mulch, and erosion control mats (e.g. jute twisted
yarn, excelsior wood fiber mats).
Total Maximum Daily Load (TMDL) – the sum of the allowable loads of a single
pollutant from all contributing point and nonpoint sources. It is a calculation of the
maximum amount of a pollutant that a waterbody can receive and still meet water
quality standards, and an allocation of that amount to the pollutant's sources. A TMDL
stipulates Waste Load Allocations (WLA) for point source discharges, Load Allocations
(LA) for nonpoint sources, and a margin of safety (MOS).
Traditional Land Use Control MS4 Operator – a city, town, or village with land use
control authority that is authorized to discharge under New York State DEC’s SPDES
General Permit For Stormwater Discharges from Municipal Separate Stormwater Sewer
Systems (MS4s) or the City of New York’s Individual SPDES Permit for their Municipal
Separate Storm Sewer Systems (NY-0287890).
Trained Contractor – an employee from the contracting (construction) company,
identified in Part III.A.7., that has received four (4) hours of NYSDEC endorsed training
62
Page 1398 of 1493
Page 1399
Appendix A
in proper erosion and sediment control principles from a Soil and Water Conservation
District, or other NYSDEC endorsed entity. After receiving the initial training, the trained
contractor shall receive four (4) hours of training every three (3) years.
It can also mean an employee from the contracting (construction) company, identified in
Part III.A.7., that meets the qualified inspector qualifications (e.g. licensed Professional
Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered
Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same
company as, the licensed Professional Engineer or Registered Landscape Architect,
provided they have received four (4) hours of NYSDEC endorsed training in proper
erosion and sediment control principles from a Soil and Water Conservation District, or
other NYSDEC endorsed entity).
The trained contractor is responsible for the day-to-day implementation of the SWPPP.
Tree Clearing – construction activities limited to felling and removal of trees.
Tree clearing does not include hand felling and leaving the trees in place with no
support from mechanized equipment, which is not considered construction activity
requiring coverage under this permit.
Water Quality Standard – such measures of purity or quality for any waters in relation
to their reasonable and necessary use as promulgated in 6 NYCRR Part 700 et seq.
63
Page 1399 of 1493
Page 1400
Appendix B
APPENDIX B – Required SWPPP Components by Project Type
Table 1
CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP
THAT ONLY INCLUDES EROSION AND SEDIMENT CONTROLS
The following construction activities that involve soil disturbances of one (1) or more acres of
land, but less than five (5) acres:
• Single-family home not located in one of the watersheds listed in Appendix C and not directly
discharging to one of the 303(d) segments listed in Appendix D
• Single-family residential subdivisions with 25% or less impervious cover at total site build-out and
not located in one of the watersheds listed in Appendix C and not directly discharging to one of the
303(d) segments listed in Appendix D
• Construction of a barn or other agricultural building, silo, stock yard or pen.
• Structural agricultural conservation practices as identified in Table II in the “Agricultural Best
Management Practice Systems Catalogue” (dated June 2023) that include construction or
reconstruction of impervious area or alter hydrology from pre- to post-development conditions.
The following construction activities that involve soil disturbances between five thousand (5000)
square feet and one (1) acre of land:
• All construction activities located in the New York City Watershed located east of the Hudson River,
see Appendix C Figure 1, that involve soil disturbances between five thousand (5,000) square feet
and one (1) acre of land.
Within the municipal boundaries of NYC:
• Stand-alone road reconstruction, where the total soil disturbance from only that road construction, is
less than one (1) acre of land.
The following construction activities:
• Installation of underground linear utilities; such as gas lines, fiber-optic cable, cable TV,
electric, telephone, sewer mains, and water mains
• Environmental enhancement projects, such as wetland mitigation, stormwater retrofits, stream
restoration, and resiliency projects that reconstruct shoreline areas to address sea level rise
• Pond construction
• Linear bike paths running through areas with vegetative cover, including bike paths surfaced with an
impervious cover
• Cross-country ski trails, walking/hiking trails, and mountain biking trails, including a de minimis
parking lot (maximum 10 spaces total, sized for passenger cars) with 35 feet minimum preservation
of undisturbed area downgradient from the parking lot
• Dam rehabilitation (the structure of the dam itself)
• Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are not part of
residential, commercial, or institutional development;
• Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that include incidental
shoulder or curb work along an existing highway to support construction of the sidewalk, bike path,
or walking path.
64
Page 1400 of 1493
Page 1401
Appendix B
Table 1 (Continued)
CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP
THAT ONLY INCLUDES EROSION AND SEDIMENT CONTROLS
The following construction activities:
• Slope stabilization
• Slope flattening that changes the grade of the site, but does not significantly change the runoff
characteristics
• Spoil areas that will be covered with vegetation
• Vegetated open space (i.e. recreational parks, lawns, meadows, fields, downhill ski trails) that do
not alter hydrology from pre- to post-development conditions
• Athletic fields (natural grass) that do not include the construction or reconstruction of impervious
area and do not alter hydrology from pre- to post-development conditions
• Demolition where vegetation will be established, and no redevelopment activity is planned1
• Installation or replacement of either an overhead electric transmission line or a ski lift tower that
does not include the construction of permanent access roads or parking areas surfaced with
impervious cover.
• Solar array field areas that have tables elevated off the ground, spaced one table width apart, do
not alter hydrology from pre- to post-development conditions, and address water quality volume and
runoff reduction volume by maintaining sheet flow on slopes less than 8%.
• Structural agricultural conservation practices as identified in Table II in the “Agricultural Best
Management Practice Systems Catalogue” (dated June 2023) that do not include construction or
reconstruction of impervious area and do not alter hydrology from pre- to post-development
conditions.
• Temporary access roads, median crossovers, detour roads, lanes, or other temporary impervious
areas that will be restored to pre-construction conditions once the construction activity is complete
(in this context, “temporary” means the impervious area will be in place for two years or less)
• Other construction activities that do not include the construction or reconstruction of impervious
area, and do not alter hydrology from pre- to post-development conditions, and are not listed in
Table 2.
1. If the site is redeveloped in the future, a new eNOI must be submitted.
65
Page 1401 of 1493
Page 1402
Appendix B
Table 2
CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP THAT INCLUDES
POST-CONSTRUCTION STORMWATER MANAGEMENT PRACTICES (SMPS)
The following construction activities:
• Single-family home located in one of the watersheds listed in Appendix C or directly discharging to
one of the 303(d) segments listed in Appendix D
• Single-family home that disturbs five (5) or more acres of land
• Single-family residential subdivisions located in one of the watersheds listed in Appendix C or
directly discharging to one of the 303(d) segments listed in Appendix D
• Single-family residential subdivisions that involve soil disturbances of between one (1) and five (5)
acres of land with greater than 25% impervious cover at total site build-out
• Single-family residential subdivisions that involve soil disturbances of between 20,000 square feet
and one (1) acre of land within the municipal boundaries of NYC with greater than 25% impervious
cover at total site build-out
• Single-family residential subdivisions that involve soil disturbances of five (5) or more acres of land,
and single-family residential subdivisions that involve soil disturbances of less than five (5) acres
that are part of a common plan of development or sale that will ultimately disturb five (5) or more
acres of land
• Multi-family residential developments; includes duplexes, townhomes, condominiums, senior
housing complexes, apartment complexes, and mobile home parks
• Creation of 5,000 square feet or more of impervious area in the municipal boundaries of NYC
• Airports
• Amusement parks
• Breweries, cideries, and wineries, including establishments constructed on agricultural land
• Campgrounds
• Cemeteries that include the construction or reconstruction of impervious area (>5% of disturbed
area) or alter the hydrology from pre- to post-development conditions
• Commercial developments
• Churches and other places of worship
• Construction of a barn or other agricultural building (e.g. silo) that involves soil disturbance greater
than five acres.
• Structural agricultural conservation practices as identified in Table II in the “Agricultural Best
Management Practice Systems Catalogue” (dated June 2023) that involves soil disturbance greater
than five acres and include the construction or reconstruction of impervious area or alter hydrology
from pre- to post-development conditions.
• Facility buildings, including ski lodges, restroom buildings, pumphouses, ski lift terminals, and
maintenance and groomer garages
• Institutional development; includes hospitals, prisons, schools and colleges
• Industrial facilities; includes industrial parks
• Landfills; including creation of landfills or capping landfills.
• Municipal facilities; includes highway garages, transfer stations, office buildings, POTWs, water
treatment plants, and water storage tanks
• Golf courses
• Office complexes
66
Page 1402 of 1493
Page 1403
Appendix B
Table 2 (Continued)
CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP THAT INCLUDES
POST-CONSTRUCTION STORMWATER MANAGEMENT PRACTICES (SMPS)
The following construction activities:
• Permanent laydown yards and equipment storage lots
• Playgrounds that include the construction or reconstruction of impervious area
• Sports complexes
• Racetracks; includes racetracks with earthen (dirt) surfaces
• Road construction or reconstruction, outside the municipal boundaries of NYC
• Road construction within the municipal boundaries of NYC
• Stand-alone road reconstruction, within the municipal boundaries of NYC where the total soil
disturbance from that road reconstruction involves soil disturbance of one (1) acre or more of land
• Parking lot construction or reconstruction (as with all Table 2 bullets, this includes parking lots
constructed as part of the construction activities listed in Table 1, unless a Table 1 bullet specifies
otherwise)
• Athletic fields (natural grass) that include the construction or reconstruction of impervious area
(>5% of disturbed area) or alter the hydrology from pre- to post-development conditions
• Athletic fields with artificial turf
• Permanent access roads, parking areas, substations, compressor stations, and well drilling pads,
surfaced with impervious cover, and constructed as part of an overhead electric transmission line,
wind-power, cell tower, oil or gas well drilling, sewer or water main, ski lift, or other linear utility
project
• Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are part of a
residential, commercial or institutional development
• Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are part of
highway construction or reconstruction
• Solar array field areas on slopes greater than 8% that cannot maintain sheet flow using
management practices identified in the BB or the DM
• Solar array field areas on slopes less than 8% that will alter the hydrology from pre- to post-
development conditions
• Solar array field areas with tables that are not elevated high enough to achieve final stabilization
beneath the tables
• Traditional impervious areas associated with solar development (e.g. roads, buildings,
transformers)
• Utility pads surfaced with impervious cover, including electric vehicle charging stations
• All other construction activities that include the construction or reconstruction of impervious area
or alter the hydrology from pre- to post-development conditions, and are not listed in Table 1
67
Page 1403 of 1493
Page 1404
Appendix C
APPENDIX C – Watersheds Requiring Enhanced Phosphorus Removal
Watersheds where owners or operators of construction activities identified in
Table 2 of Appendix B must prepare a SWPPP that includes SMPs designed in
conformance with the Enhanced Phosphorus Removal Standards included in the
DM technical standard.
• Entire New York City Watershed located east of the Hudson River – Figure 1
• Onondaga Lake Watershed – Figure 2
• Greenwood Lake Watershed – Figure 3
• Oscawana Lake Watershed – Figure 4
• Kinderhook Lake Watershed – Figure 5
68
Page 1404 of 1493
Page 1405
Appendix C
Figure 1 - New York City Watershed East of the Hudson
69
Page 1405 of 1493
Page 1406
Appendix C
Figure 2 - Onondaga Lake Watershed
70
Page 1406 of 1493
Page 1407
Appendix C
Figure 3 - Greenwood Lake Watershed
71
Page 1407 of 1493
Page 1408
Appendix C
Figure 4 - Oscawana Lake Watershed
72
Page 1408 of 1493
Page 1409
Appendix C
Figure 5 - Kinderhook Lake Watershed
73
Page 1409 of 1493
Page 1410
APPENDIX D – Impaired Waterbodies (by Construction Related Pollutants)
List of waterbodies impaired by pollutants related to construction activity, including turbidity,
silt/sediment, and nutrients (e.g. nitrogen, phosphorus). This list is a subset of “The Final New
York State 2018 Section 303(d) List of Impaired Waters Requiring a TMDL” dated June 2020.
County Waterbody Pollutant
Albany Ann Lee (Shakers) Pond, Stump Pond (1201-0096) Phosphorus
Albany Lawsons Lake (1301-0235) Phosphorus
Allegany Amity Lake, Saunders Pond (0403-0054) Phosphorus
Allegany Andover Pond (0403-0056) Phosphorus
Bronx Reservoir No.1/Lake Isle (1702-0075) Phosphorus
Bronx Van Cortlandt Lake (1702-0008) Phosphorus
Broome Blueberry, Laurel Lakes (1404-0033) Phosphorus
Broome Fly Pond, Deer Lake (1404-0038) Phosphorus
Broome Minor Tribs to Lower Susquehanna (0603-0044) Phosphorus
Broome Whitney Point Lake/Reservoir (0602-0004) Phosphorus
Cattaraugus Allegheny River/Reservoir (0201-0023) Phosphorus
Cattaraugus Beaver Lake/Alma Pond (0201-0073) Phosphorus
Cattaraugus Case Lake (0201-0020) Phosphorus
Cattaraugus Linlyco/Club Pond (0201-0035) Phosphorus
Cayuga Duck Lake (0704-0025) Phosphorus
Cayuga Owasco Inlet, Upper, and tribs (0706-0014) Nutrients
Chautauqua Chadakoin River and tribs (0202-0018) Phosphorus
Chautauqua Hulburt/Clymer Pond (0202-0079) Phosphorus
Chautauqua Middle Cassadaga Lake (0202-0002) Phosphorus
Clinton Great Chazy River, Lower, Main Stem (1002-0001) Silt/Sediment
Columbia Robinson Pond (1308-0003) Phosphorus
Cortland Dean Pond (0602-0077) Phosphorus
Dutchess Fallkill Creek (1301-0087) Phosphorus
Dutchess Hillside Lake (1304-0001) Phosphorus
Dutchess Wappingers Lake (1305-0001) Phosphorus
Dutchess Wappingers Lake (1305-0001) Silt/Sediment
Erie Beeman Creek and tribs (0102-0030) Phosphorus
Erie Delaware Park Pond (0101-0026) Phosphorus
Erie Ellicott Creek, Lower, and tribs (0102-0018) Phosphorus
Erie Ellicott Creek, Lower, and tribs (0102-0018) Silt/Sediment
Erie Green Lake (0101-0038) Phosphorus
Erie Little Sister Creek, Lower, and tribs (0104-0045) Phosphorus
Erie Murder Creek, Lower, and tribs (0102-0031) Phosphorus
Page 1410 of 1493
Page 1411
Erie Rush Creek and tribs (0104-0018) Phosphorus
Erie Scajaquada Creek, Lower, and tribs (0101-0023) Phosphorus
Erie Scajaquada Creek, Middle, and tribs (0101-0033) Phosphorus
Erie Scajaquada Creek, Upper, and tribs (0101-0034) Phosphorus
South Branch Smoke Cr, Lower, and tribs
Erie Phosphorus
(0101-0036)
South Branch Smoke Cr, Lower, and tribs
Erie Silt/Sediment
(0101-0036)
Genesee Bigelow Creek and tribs (0402-0016) Phosphorus
Genesee Black Creek, Middle, and minor tribs (0402 0028) Phosphorus
Genesee Black Creek, Upper, and minor tribs (0402-0048) Phosphorus
Genesee Bowen Brook and tribs (0102-0036) Phosphorus
Genesee LeRoy Reservoir (0402-0003) Phosphorus
Genesee Mill Pond (0402-0050) Phosphorus
Genesee Oak Orchard Cr, Upper, and tribs (0301-0014) Phosphorus
Genesee Oatka Creek, Middle, and minor tribs (0402-0031) Phosphorus
Genessee Tonawanda Cr, Middle, Main Stem (0102-0002) Phosphorus
Greene Schoharie Reservoir (1202-0012) Silt/Sediment
Greene Sleepy Hollow Lake (1301-0059) Silt/Sediment
Herkimer Steele Creek tribs (1201-0197) Phosphorus
Herkimer Steele Creek tribs (1201-0197) Silt/Sediment
Kings Hendrix Creek (1701-0006) 18 Nitrogen
Kings Prospect Park Lake (1701-0196) Phosphorus
Lewis Mill Creek/South Branch, and tribs (0801-0200) Nutrients
Livingston Christie Creek and tribs (0402-0060) Phosphorus
Livingston Conesus Lake (0402-0004) Phosphorus
Livingston Mill Creek and minor tribs (0404-0011) Silt/Sediment
Monroe Black Creek, Lower, and minor tribs (0402-0033) Phosphorus
Monroe Buck Pond (0301-0017) Phosphorus
Monroe Cranberry Pond (0301-0016) Phosphorus
Monroe Durand, Eastman Lakes (0302-0037) Phosphorus
Monroe Lake Ontario Shoreline, Western (0301-0069) 9 Phosphorus
Monroe Long Pond (0301-0015) Phosphorus
Monroe Mill Creek and tribs (0302-0025) Phosphorus 2
Monroe Mill Creek/Blue Pond Outlet and tribs (0402-0049) Phosphorus
Monroe Minor Tribs to Irondequoit Bay (0302-0038) Phosphorus
Monroe Rochester Embayment - East (0302-0002) [9] Phosphorus
Monroe Rochester Embayment - West (0301-0068) 9 Phosphorus
Monroe Shipbuilders Creek and tribs (0302-0026) Phosphorus 2
Monroe Thomas Creek/White Brook and tribs (0302-0023) Phosphorus
75
Page 1411 of 1493
Page 1412
Nassau Bannister Creek/Bay (1701-0380) Nitrogen
Nassau Beaver Lake (1702-0152) Phosphorus
Nassau Browswere Bay (1701-0383) Nitrogen
Nassau Camaans Pond (1701-0052) Phosphorus
Nassau East Meadow Brook, Upper, and tribs (1701-0211) Silt/Sediment
Nassau East Rockaway Channel (1701-0381) Nitrogen
Nassau Glen Cove Creek, Lower, and tribs (1702-0146) Silt/Sediment
Nassau Grant Park Pond (1701-0054) Phosphorus
Nassau Hempstead Bay, Broad Channel (1701-0032) Nitrogen
Nassau Hempstead Lake (1701-0015) Phosphorus
Nassau Hewlett Bay (1701-0382) Nitrogen
Nassau Hog Island Channel (1701-0220) Nitrogen
Nassau Massapequa Creek, Upper, and tribs (1701-0174) Phosphorus
Milburn/Parsonage Creeks, Upp, and tribs (1701-
Nassau Phosphorus
0212)
Nassau Reynolds Channel, East (1701-0215) [12] Nitrogen
Nassau Reynolds Channel, West (1701-0216) 12 Nitrogen
Nassau Tidal Tribs to Hempstead Bay (1701-0218) Nitrogen
Nassau Tribs (fresh) to East Bay (1701-0204) Silt/Sediment
Nassau Tribs (fresh) to East Bay (1701-0204) Phosphorus
Nassau Tribs to Smith Pond/Halls Pond (1701-0221) Phosphorus
Nassau Woodmere Channel (1701-0219) Nitrogen
New York Harlem Meer (1702-0103) Phosphorus
New York The Lake in Central Park (1702-0105) Phosphorus
Niagara Bergholtz Creek and tribs (0101-0004) Phosphorus
Niagara Hyde Park Lake (0101-0030) Phosphorus
Niagara Lake Ontario Shoreline, Western (0301-0053) 9 Phosphorus
Niagara Lake Ontario Shoreline, Western (0301-0072) 9 Phosphorus
Oneida Ballou, Nail Creeks (1201-0203) Phosphorus
Nutrients
Onondaga Ley Creek and tribs (0702-0001) 10
(phosphorus)
Nutrients
Onondaga Minor Tribs to Onondaga Lake (0702-0022) 10
(phosphorus)
Onondaga Minor Tribs to Onondaga Lake (0702-0022) 10 Nitrogen (NH3, NO2)
Nutrients
Onondaga Onondaga Creek, Lower (0702-0023) 10
(phosphorus)
Onondaga Onondaga Creek, Lower, and tribs (0702-0023) Turbidity
Onondaga Onondaga Creek, Middle, and tribs (0702-0004) Turbidity
Onondaga Onondaga Creek, Upper, and tribs (0702-0024) Turbidity
Ontario Great Brook and minor tribs (0704-0034) Phosphorus 2
Ontario Great Brook and minor tribs (0704-0034) Silt/Sediment
76
Page 1412 of 1493
Page 1413
Ontario Hemlock Lake Outlet and minor tribs (0402-0013) Phosphorus
Ontario Honeoye Lake (0402-0032) Phosphorus
Orange Brown Pond Reservoir (1303-0013) Phosphorus
Orange Lake Washington (1303-0012) Phosphorus
Orange Minor Tribs to Middle Wallkill (1306-0061) Phosphorus
Orange Monhagen Brook and tribs (1306-0074) Phosphorus
Orange Orange Lake (1301-0008) [16] Phosphorus
Orange Quaker Creek and tribs (1306-0025) Phosphorus
Orange Wallkill River, Middle, Main Stem (1306-0038) Phosphorus
Orange Wallkill River, Upper, and Minor tribs (1306-0017) Phosphorus
Orleans Glenvwood Lake (0301-0041) Phosphorus
Orleans Lake Ontario Shoreline, Western (0301-0070) 9 Phosphorus
Orleans Lake Ontario Shoreline, Western (0301-0071) 9 Phosphorus
Nutrients
Oswego Lake Neatahwanta (0701-0018)
(phosphorus)
Oswego Pleasant Lake (0703-0047) Phosphorus
Putnam Lost Lake, Putnam Lake (1302-0053) Phosphorus
Putnam Minor Tribs to Croton Falls Reservoir (1302-0001) Phosphorus
Queens Bergen Basin (1701-0009) 18 Nitrogen
Jamaica Bay, Eastern, and tribs, Queens (1701-
Queens Nitrogen
0005) 18
Queens Kissena Lake (1702-0258) Phosphorus
Queens Meadow Lake (1702-0030) Phosphorus
Queens Shellbank Basin (1701-0001) 18 Nitrogen
Queens Willow Lake (1702-0031) Phosphorus
Rensselaer Nassau Lake (1310-0001) Phosphorus
Rensselaer Snyders Lake (1301-0043) Phosphorus
Richmond Grassmere Lake/Bradys Pond (1701-0357) Phosphorus
Rockland Congers Lake, Swartout Lake (1501-0019) Phosphorus
Rockland Rockland Lake (1501-0021) Phosphorus
Saratoga Ballston Lake (1101-0036) Phosphorus
Saratoga Dwaas Kill and tribs (1101-0007) Phosphorus
Saratoga Dwaas Kill and tribs (1101-0007) Silt/Sediment
Saratoga Lake Lonely (1101-0034) Phosphorus
Saratoga Round Lake (1101-0060) Phosphorus
Saratoga Tribs to Lake Lonely (1101-0001) Phosphorus
Schenectady Collins Lake (1201-0077) Phosphorus
Schenectady Duane Lake (1311-0006) Phosphorus
Schenectady Lake Mariaville Lake (1201-0113) Phosphorus
Schuyler Cayuta Lake (0603-0005) Phosphorus
77
Page 1413 of 1493
Page 1414
Seneca Reeder Creek and tribs (0705-0074) Phosphorus
St.Lawrence Black Lake Outlet, Black Lake (0906-0001) Phosphorus
St.Lawrence Fish Creek and minor tribs (0906-0026) Phosphorus
Steuben Smith Pond (0502-0012) Phosphorus
Suffolk Agawam Lake (1701-0117) Phosphorus
Suffolk Big/Little Fresh Ponds (1701-0125) Phosphorus
Suffolk Canaan Lake (1701-0018) Phosphorus
Suffolk Canaan Lake (1701-0018) Silt/Sediment
Suffolk Fresh Pond (1701-0241) Phosphorus
Suffolk Great South Bay, East (1701-0039) Nitrogen
Suffolk Great South Bay, Middle (1701-0040) Nitrogen
Suffolk Great South Bay, West (1701-0173) Nitrogen
Suffolk Lake Ronkonkoma (1701-0020) Phosphorus
Suffolk Mattituck/Marratooka Pond (1701-0129) Phosphorus
Suffolk Mill and Seven Ponds (1701-0113) Phosphorus
Suffolk Millers Pond (1702-0013) Phosphorus
Suffolk Moriches Bay, East (1701-0305) Nitrogen
Suffolk Moriches Bay, West (1701-0038) Nitrogen
Suffolk Quantuck Bay (1701-0042) Nitrogen
Suffolk Shinnecock Bay and Inlet (1701-0033) Nitrogen
Suffolk Tidal Tribs to West Moriches Bay (1701-0312) Nitrogen
Sullivan Bodine, Mongomery Lakes (1401-0091) Phosphorus
Sullivan Davies Lake (1402-0047) Phosphorus
Sullivan Evens Lake (1402-0004) Phosphorus
Sullivan Pleasure Lake (1402-0055) Phosphorus
Sullivan Swan Lake (1401-0063) Phosphorus
Tompkins Cayuga Lake, Southern End (0705-0040) Phosphorus
Tompkins Cayuga Lake, Southern End (0705-0040) Silt/Sediment
Ulster Ashokan Reservoir (1307-0004) Silt/Sediment
Ulster Esopus Creek, Lower, Main Stem (1307-0010) [17] Turbidity
Ulster Esopus Creek, Middle, Main Stem (1307-0003) 17 Turbidity
Esopus Creek, Upper, and minor tribs
Ulster Silt/Sediment
(1307-0007)[3]
Ulster Wallkill River, Lower, Main Stem (1306-0027) Phosphorus
Warren Hague Brook and tribs (1006-0006) Silt/Sediment
Warren Huddle/Finkle Brooks and tribs (1006-0003) Silt/Sediment
Warren Indian Brook and tribs (1006-0002) Silt/Sediment
Warren Lake George (1006-0016) and tribs Silt/Sediment
Warren Tribs to Lake George, East Shore (1006-0020) Silt/Sediment
Warren Tribs to Lake George, Lk.George Village (1006-0008) Silt/Sediment
78
Page 1414 of 1493
Page 1415
Washington Wood Cr/Champlain Canal and tribs (1005-0036) Phosphorus
Westchester Lake Katonah (1302-0136) Phosphorus
Westchester Lake Lincolndale (1302-0089) Phosphorus
Westchester Lake Meahagh (1301-0053) Phosphorus
Westchester Lake Mohegan (1301-0149) Phosphorus
Westchester Lake Shenorock (1302-0083) Phosphorus
Westchester Mamaroneck River, Lower (1702-0071) Silt/Sediment
Westchester Mamaroneck River, Upp, & minor tribs (1702-0123) Silt/Sediment
Westchester Saw Mill River (1301-0007) Phosphorus
Westchester Saw Mill River, Middle, and tribs (1301-0100) Phosphorus
Westchester Sheldrake River (1702-0069) Phosphorus
Westchester Sheldrake River (1702-0069) Silt/Sedimnt
Westchester Silver Lake (1702-0040) Phosphorus
Westchester Teatown Lake (1302-0150) Phosphorus
Westchester Truesdale Lake (1302-0054) Phosphorus
Westchester Wallace Pond (1301-0140) Phosphorus
79
Page 1415 of 1493
Page 1416
APPENDIX E – List of NYSDEC Regional Offices
DIVISION OF DIVISION OF WATER
COVERING THE ENVIRONMENTAL
Region (DOW)
FOLLOWING COUNTIES: PERMITS (DEP) WATER (SPDES) PROGRAM
PERMIT ADMINISTRATORS
50 CIRCLE ROAD 50 CIRCLE ROAD
1 NASSAU AND SUFFOLK STONY BROOK, NY 11790 STONY BROOK, NY 11790-3409
TEL. (631) 444-0365 TEL. (631) 444-0405
1 HUNTERS POINT PLAZA, 1 HUNTERS POINT PLAZA,
BRONX, KINGS, NEW YORK, 47-40 21ST ST. 47-40 21ST ST.
2 QUEENS AND RICHMOND LONG ISLAND CITY, NY 11101-5407 LONG ISLAND CITY, NY 11101-5407
TEL. (718) 482-4997 TEL. (718) 482-4933
DUTCHESS, ORANGE, PUTNAM, 21 SOUTH PUTT CORNERS ROAD
220 WHITE PLAINS ROAD, SUITE 110
3 ROCKLAND, SULLIVAN, ULSTER NEW PALTZ, NY 12561-1696
TEL. (914) 428 - 2505
AND WESTCHESTER TEL. (845) 256-3059
ALBANY, COLUMBIA,
DELAWARE, GREENE, 1130 NORTH WESTCOTT ROAD 1130 NORTH WESTCOTT ROAD
4 MONTGOMERY, OTSEGO, SCHENECTADY, NY 12306-2014 SCHENECTADY, NY 12306-2014
RENSSELAER, SCHENECTADY TEL. (518) 357-2069 TEL. (518) 357-2045
AND SCHOHARIE
CLINTON, ESSEX, FRANKLIN,
1115 STATE ROUTE 86, PO BOX 296 232 GOLF COURSE ROAD
FULTON, HAMILTON,
5 SARATOGA, WARREN AND
RAY BROOK, NY 12977-0296 WARRENSBURG, NY 12885-1172
TEL. (518) 897-1234 TEL. (518) 623-1200
WASHINGTON
STATE OFFICE BUILDING STATE OFFICE BUILDING
HERKIMER, JEFFERSON,
317 WASHINGTON STREET 207 GENESEE STREET
6 LEWIS, ONEIDA AND
WATERTOWN, NY 13601-3787 UTICA, NY 13501-2885
ST. LAWRENCE
TEL. (315) 785-2245 TEL. (315) 793-2554
BROOME, CAYUGA,
CHENANGO, CORTLAND, 5786 WIDEWATERS PARKWAY 5786 WIDEWATERS PARKWAY
7 MADISON, ONONDAGA, SYRACUSE, NY 13214-1867 SYRACUSE, NY 13214-1867
OSWEGO, TIOGA AND TEL. (315) 426-7438 TEL. (315) 426-7500
TOMPKINS
CHEMUNG, GENESEE,
LIVINGSTON, MONROE, 6274 EAST AVON-LIMA 6274 EAST AVON-LIMA RD.
ONTARIO, ORLEANS,
8 SCHUYLER, SENECA,
ROADAVON, NY 14414-9519 AVON, NY 14414-9519
TEL. (585) 226-2466 TEL. (585) 226-2466
STEUBEN, WAYNE AND
YATES
ALLEGANY,
700 DELAWARE AVENUE 700 DELAWARE AVENUE
CATTARAUGUS,
9 CHAUTAUQUA, ERIE,
BUFFALO, NY 14209-2999 BUFFALO, NY 14209-2999
TEL. (716) 851-7165 TEL. (716) 851-7070
NIAGARA AND WYOMING
80
Page 1416 of 1493
Page 1417
APPENDIX F – SWPPP Preparer Certification Form
The SWPPP Preparer Certification Form required by this permit begins on the following
page.
81
Page 1417 of 1493
Page 1418
SWPPP Preparer Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and
submitted to NYSDEC electronically.)
Project/Site Name:
eNOI Submission ID:
Owner/Operator Name:
Certification Statement – SWPPP Preparer
I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) has been
prepared in accordance with the requirements of GP-0-25-001. I certify under penalty
of law that the SWPPP and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge
and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
SWPPP Preparer First Name MI SWPPP Preparer Last Name
Signature Date
Revised: January 2025
Page 1418 of 1493
Page 1419
APPENDIX G – MS4 SWPPP Acceptance Form
The MS4 SWPPP Acceptance Form required by this permit begins on the following
page.
83
Page 1419 of 1493
Page 1420
MS4 SWPPP Acceptance Form
for construction activities seeking authorization under the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI
and submitted to NYSDEC electronically.)
I. Project Owner/Operator Information
1. Owner/Operator Name:
2. Contact Person:
3. Street Address:
4. City/State/Zip:
II. Project Site Information
5. Project/Site Name:
6. Street Address:
7. City/State/Zip:
III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance Information
8. SWPPP Reviewed by:
9. Title/Position:
10. Date Final SWPPP Reviewed and Accepted:
IV. Regulated MS4 Information
11. Name of MS4 Operator:
12. MS4 SPDES Permit Identification Number: NYR20A
13. Street Address:
14. City/State/Zip:
15. Telephone Number:
Page 1 of 2
Page 1420 of 1493
Page 1421
MS4 SWPPP Acceptance Form - continued
V. Certification Statement - MS4 Official (principal executive officer or ranking elected official) or
Duly Authorized Representative
I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project
identified in section II. of this form has been reviewed and meets the substantive requirements in the
SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP).
Note: The MS4 Operator, through the acceptance of the SWPPP, assumes no responsibility for the
accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of
the SWPPP by the MS4 Operator does not relieve the owner/operator or their SWPPP preparer of
responsibility or liability for errors or omissions in the plan.
Printed Name1:
Title/Position:
Signature:
Date:
VI. Additional Information
1 Printed name of the principal executive officer or ranking elected official for the MS4 Operator or their
duly authorized representative in accordance with CGP Part VII.J.2.
(NYSDEC - MS4 SWPPP Acceptance Form - January 2025)
Page 2 of 2
Page 1421 of 1493
Page 1422
APPENDIX H – NYCDEP SWPPP Acceptance/Approval Form
The City of New York Department of Environmental Protection (NYCDEP) SWPPP
Acceptance/Approval form required by this permit begins on the following page.
86
Page 1422 of 1493
Page 1423
THE CITY OF NEW YORK
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Bureau of Environmental Planning and Analysis
59-17 Junction Blvd., 9th Floor; Flushing, NY 11373
SWPPP Acceptance/Approval
Application Number:
I. Project Owner/Operator Information
1. Owner/Operator Name:
2. Contact Person:
3. Street Address:
4. City/State/Zip:
II. Project Site Information
5. Project/Site Name:
6. Street Address:
7. City/State/Zip:
III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance/Approval
8. SWPPP Reviewed by:
9. Title/Position: /
10. Date Final SWPPP Reviewed and Accepted:
11. Acceptance/Approval Expiration Date:
IV. Regulated MS4 Information for projects that require coverage under the NY State Pollution
Discharge Elimination System General Permit for Stormwater Discharges from Construction
Activity
12. Name of MS4: CITY OF NEW YORK
13. MS4 SPDES Permit Identification Number: NY-0287890
14. Contact Person:
15. Street Address: 59-17 Junction Blvd. 9th Floor
16. City/State/Zip: Flushing, NY 11373
17. Telephone Number:
Projects in the MS4 area must submit a copy of this SWPPP Acceptance with a Notice of
Intent for coverage under the NY SPDES General Permit for Stormwater Discharges from
Construction Activity to: NYS Department of Environmental Conservation, Division of Water;
625 Broadway, 4th Floor; Albany, New York 12233-3505.
Page 1423 of 1493
Page 1 Of 2
Page 1424
THE CITY OF NEW YORK
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Bureau of Environmental Planning and Analysis
59-17 Junction Blvd., 9th Floor; Flushing, NY 11373
V. Certification Statement - MS4 Official (principal executive officer or ranking elected official) or
Duly Authorized Representative
I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project identified
in question 5 has been reviewed and meets the substantive requirements in the SPDES General Permit For
Stormwater Discharges from Municipal Separate Storm Sewer Systems (MS4s).
Note: The MS4, through the acceptance of the SWPPP, assumes no responsibility for the accuracy and adequacy of
the design included in the SWPPP. In addition, review and acceptance of the SWPPP by the MS4 does not
relieve the owner/operator or their SWPPP preparer of responsibility or liability for errors or omissions in the plan.
Printed Name:
Title/Position:
Signature:
Date:
VI. Conditions of Acceptance/Approval and Additional Information
Projects in the MS4 area must submit a copy of this SWPPP Acceptance with a Notice of
Intent for coverage under the NY SPDES General Permit for Stormwater Discharges from
Construction Activity to: NYS Department of Environmental Conservation, Division of Water;
625 Broadway, 4th Floor; Albany, New York 12233-3505.
Page 1424 of 1493
Page 2 Of 2
Page 1425
APPENDIX I – MS4 No Jurisdiction Form
The MS4 No Jurisdiction Form required by this permit begins on the following page.
89
Page 1425 of 1493
Page 1426
MS4 No Jurisdiction Form
for construction activities seeking authorization under the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and submitted to NYSDEC
electronically.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. eNOI Submission ID:
III. Traditional Land Use Control MS4 Operator Information
a. Name of MS4 Operator:
b. MS4 SPDES Permit ID Number: NYR20A
c. Street Address:
d. City/State/Zip:
e. Telephone Number:
IV. Certification Statement
In accordance with CGP Part I.D.2.b.ii.3., I hereby certify that the Traditional Land Use Control MS4
Operator identified in section III. of this form does not have review authority over the construction
project identified in section II. of this form, which is owned/operated by the entity identified in section I.
of this form. I am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations.
a. Printed name of the principal executive officer or ranking elected official for the MS4 Operator or
their duly authorized representative in accordance with CGP Part VII.J.2.:
b. Title/Position:
c. Signature:
d. Date:
Page 1426 of 1493
Page 1427
APPENDIX J – Owner/Operator Certification Form
The Owner/Operator Certification Form required by this permit begins on the following
page.
91
Page 1427 of 1493
Page 1428
Owner/Operator Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b. or Part I.F.2. and 3., the completed form must be attached to the eNOI or the
Request to Continue Coverage, and submitted to NYSDEC electronically.
Project/Site Name: ________________________________________________________
eNOI Submission ID: _________________________________________________
eNOI Submitted by: Owner/Operator SWPPP Preparer Other
Certification Statement - Owner/Operator
I hereby certify that I read, and will comply with, the GP-0-25-001 permit requirements. I understand that
authorization to discharge under the permit for the project/site named above is dependent on receipt of a
Letter of Authorization (LOA) or a Letter of Continued Coverage (LOCC) from the New York State
Department of Environmental Conservation (NYSDEC) in accordance with CGP Part I.D.3.b. or Part I.F.4.
I am aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.
Owner/Operator First Name MI Owner/Operator Last Name
___________________________________________________________
Signature
________________________________
Date
Revised: January 2025
Page 1428 of 1493
Page 1429
Appendix F
Forms
Page 1429 of 1493
Page 1430
STORM WATER POLLUTION PREVENTION PLAN
CONTRACTOR’S CERTIFICATION STATEMENT
Multifamily Development – 1425 & 1475 Orchard Park Road
CONTRACTOR'S CERTIFICATION:
“I certify under penalty of law that I understand and agree to comply with the terms and conditions of the SWPPP
for the construction site identified in such SWPPP as a condition of authorization to discharge storm water. I also
understand that the operator must comply with the terms and conditions of the New York State Pollutant
Discharge Elimination System (SPDES) general permit for storm water discharges from construction activities and
that it is unlawful for any person to cause or contribute to a violation of water quality standards.”
Note: The contractor shall have at least one NYSDEC trained individual onsite at all times when earthwork and
other SWPPP associated work is being performed from each contractor(s) and subcontractor(s). Each contractor(s)
and subcontractor(s) shall provide copies of these individuals’ certifications to the Town of West Seneca.
Name:
(Print)
Signature:
Title:
Company Name:
Address: ___________________________________
Telephone Number: __________________________
Date: ______________________________________
Scope of Services:
Trained Individual(s) Responsible for Implementation: __________________________________________
This form must be signed by a responsible corporate officer or other party meeting the
“Signatory Requirements” of the NYSDEC SPDES General Permit
Page 1430 of 1493
Page 1431
Owner/Operator Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b. or Part I.F.2. and 3., the completed form must be attached to the eNOI or the
Request to Continue Coverage, and submitted to NYSDEC electronically.
Multifamily Development
Project/Site Name: ________________________________________________________
HQN-V818-KWDXZ
eNOI Submission ID: _________________________________________________
eNOI Submitted by: Owner/Operator ✔ SWPPP Preparer Other
Certification Statement - Owner/Operator
I hereby certify that I read, and will comply with, the GP-0-25-001 permit requirements. I understand that
authorization to discharge under the permit for the project/site named above is dependent on receipt of a
Letter of Authorization (LOA) or a Letter of Continued Coverage (LOCC) from the New York State
Department of Environmental Conservation (NYSDEC) in accordance with CGP Part I.D.3.b. or Part I.F.4.
I am aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.
Brian Hillery
Owner/Operator First Name MI Owner/Operator Last Name
___________________________________________________________
Signature
________________________________
Date
Revised: January 2025
Page 1431 of 1493
Page 1432
SWPPP Preparer Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and
submitted to NYSDEC electronically.)
Project/Site Name: Multifamily Development
eNOI Submission ID: HQN-V818-KWDXZ
Brian Hillery & William Sahlem
Owner/Operator Name:
Certification Statement – SWPPP Preparer
I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) has been
prepared in accordance with the requirements of GP-0-25-001. I certify under penalty
of law that the SWPPP and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge
and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
Anthony J Pandolfe
SWPPP Preparer First Name MI SWPPP Preparer Last Name
5/26/26
Signature Date
Revised: January 2025
Page 1432 of 1493
Page 1433
Appendix G
NYSDEC Notice of Termination (NOT)
Page 1433 of 1493
Page 1434
eNOT MS4 Acceptance
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Traditional Land Use Control MS4 Operator Information
a. Name of MS4 Operator:
b. MS4 SPDES Permit ID Number: NYR20A
c. Street Address:
d. City/State/Zip:
e. Telephone Number:
IV. Certification Statement
I have determined that it is acceptable for the owner or operator of the construction project identified
above to submit the electronic Notice of Termination in accordance with CGP Part V. I certify under
penalty of law that this document and all attachments were prepared under my direction or supervision
in accordance with a system designed to assure that qualified personnel properly gather and evaluate
the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations.
a. Printed name of the principal executive officer or ranking elected official for the MS4 Operator or
their duly authorized representative in accordance with CGP Part VII.J.2.:
b. Title/Position:
c. Signature:
d. Date:
Page 1434 of 1493
Page 1435
eNOT Owner or Operator Certification
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I certify that I have met the requirements of CGP Part V.A.1., 2., 3., and 4. I certify under
penalty of law that this document and all attachments were prepared under my direction
or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for
knowing violations.
a. Printed name of the Owner or Operator:
b. Title/Position:
c. Signature:
d. Date:
Page 1435 of 1493
Page 1436
eNOT Qualified Inspector Certification – Final Stabilization
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.i., ii., and iii. or CGP Part
V.A.1.b.i., ii., and iii. have been achieved. I certify under penalty of law that this
document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting
false information, including the possibility of fine and imprisonment for knowing
violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 1436 of 1493
Page 1437
eNOT Qualified Inspector Certification – SMPs
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.iv. or CGP Part V.A.1.b.iv.
have been achieved. I certify under penalty of law that this document and all
attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 1437 of 1493
Page 1438
Appendix H
Construction Documents
Page 1438 of 1493
Page 1439
Page 1439 of 1493
Page 1440
Page 1440 of 1493
Page 1441
Page 1441 of 1493
Page 1442
Page 1442 of 1493
Page 1443
Page 1443 of 1493
Page 1444
Page 1444 of 1493
Page 1445
Page 1445 of 1493
Page 1446
Page 1446 of 1493
Page 1447
Page 1447 of 1493
Page 1448
Page 1448 of 1493
Page 1449
Page 1449 of 1493
Page 1450
Page 1450 of 1493
Page 1451
Page 1451 of 1493
Page 1452
Page 1452 of 1493
Page 1453
Page 1453 of 1493
Page 1454
Page 1454 of 1493
Page 1455
Page 1455 of 1493
Page 1456
Page 1456 of 1493
Page 1457
Page 1457 of 1493
Page 1458
Page 1458 of 1493
Page 1459
Page 1459 of 1493
Page 1460
Page 1460 of 1493
Page 1461
Page 1461 of 1493
Page 1462
Page 1462 of 1493
Page 1463
Page 1463 of 1493
Page 1464
Page 1464 of 1493
Page 1465
Page 1465 of 1493
Page 1466
Page 1466 of 1493
Page 1467
Page 1467 of 1493
Page 1468
Appendix I
Standard Erosion Control Details
Page 1468 of 1493
Page 1469
Page 1469 of 1493
Page 1470
Page 1470 of 1493
Page 1471
Page 1471 of 1493
Page 1472
Page 1472 of 1493
Page 1473
Page 1473 of 1493
Page 1474
Page 1474 of 1493
Page 1475
Page 1475 of 1493
Page 1476
Page 1476 of 1493
Page 1477
Page 1477 of 1493
Page 1478
Appendix J
Wetland Delineation Figure: by LaBella
Page 1478 of 1493
Page 1479
Or
c
ha
rd
Brian Hillary
Pa
r
kR
Creator: ASM Reviewer: LD
Wetland and Stream
d
Nh
Delineation Report
1475 Orchard
St
at
e
Park Road
Rt
e
Orchard Park, NY
24
0
Wetland 1 Retention Pond
Swale 1
PSS PuB
Ephemeral
Wetland continues off-site
0 62.5 125 Feet
UPV-1 Culvert d
eR
erv 1 inch = 125 feet
Culvert Res
Legend
W1-5 Culvert Study Area
Bridge Data Point Location
W1-10
Wetland/Stream Flag Location
Culvert Culvert/Bridge
WET1-A
Scrub-Shrub Wetland (PSS)
Swale 2
UPL1-A Retention Pond
W1-15
Ephemeral
Ephemeral Stream
Culvert Area
Approximate Offsite Wetland/
Stream Boundary
Stream Flow Direction
W1-20 UPV-2 Road
W1-40
Soil
DbA
RfB
W1-35
WET1-B
UPL1-B
W1-30 W1-45
W1-25
Wetland continues off-site
Sources:
1. Study Area: Created by LaBella using information
Rd
provided by the client.
gr
2. Basemap: Esri, DigitalGloce, GeoEye, Earthstar,
Be
Geographics, CNES/Airbus DS, USDA, USGS
Notes: AeroGRID, IGN, and GIS User Community, 2023.
3. Mapped soil data were obtained from the NRCS
1) Wetland/stream delineation flag locations were online Soil Data (soildatamart.nrcs.usda.gov).
surveyed using a sub-foot GPS unit.
2) All areas outside of the wetlands/stream delineated
within the Project Site are considered to be upland. Approximate
3) Only select wetland/stream flag locations are labeled. Approximate NYSDEC RfA Stream Wetland and Stream
4) All wetland/stream boundaries and jurisdictions Cowardin Area within Stream
Wetland- ID Classification Waterbody Length Delineation Survey
are subject to verification by NYSDEC/USACE. Name
Classification Study Area Classification within Study
(acres) Area (lf)
All features are pending a USACE Jurisdictional Review FIGURE 5
4
and NYSDEC Jurisdictional Review under the revised Wetland 1 PSS 5.60 Swale 1 Ephemeral Unclassified 515
NYSDEC Freshwater Wetland Regulations. Retention Pond PuB 0.03 Swale 2 Ephemeral Unclassified 190
LaBella Project No: 2251287
Path: B:\GLOBAL\Projects\Hillary, Brian\2251287 - 1475 Orchard Park Road
Date: 3/27/2025
Page 1479 of 1493
Page 1480
Appendix K
OPRHP Clearance Letter
Page 1480 of 1493
Page 1481
KATHY HOCHUL ERIK KULLESEID
Governor Commissioner
January 29, 2024
Jeffrey Schieber
Town of West Seneca
1250 Union Rd
West Seneca, NY 14224
Re: DEC
Multi-Family Residential New Development
1425 Orchard Park Rd, Buffalo, NY 14224
23PR10321
Dear Jeffrey Schieber:
Thank you for requesting the comments of the Division for Historic Preservation of the Office of
Parks, Recreation and Historic Preservation (OPRHP). We have reviewed the submitted
materials in accordance with the New York State Historic Preservation Act of 1980 (section
14.09 of the New York Parks, Recreation and Historic Preservation Law). These comments are
those of the Division for Historic Preservation and relate only to Historic/Cultural resources.
They do not include potential environmental impacts to New York State Parkland that may be
involved in or near your project.
The Archaeology Unit has reviewed the Phase IA/IB Archaeological Survey Report prepared for
this project (24SR00034; January 2024). No archaeological sites were identified by the survey
and the OPRHP concurs with the report recommendation that no additional archaeological work
is necessary.
Please note that these comments pertain only to archaeological resources. Please continue to
consult with our Survey and National Register Unit. If you have any questions concerning
archaeology, I can be reached at [email protected].
Sincerely,
Sydney Snyder
Scientist - Archaeology
New York State Office of Parks, Recreation and Historic Preservation
Division for Historic Preservation, Peebles Island, PO Box 189, Waterford, New York 12188-0189
(518) 237-8643 • https://parks.ny.gov/shpo
Page 1481 of 1493
Page 1482
Appendix L
NYSDEC Stormwater Management Inspection Lists
Page 1482 of 1493
Page 1483
New York State Stormwater Management Design Manual Appendix G
Bioretention Operation, Maintenance and
Management Inspection Checklist
Project:
Location:
Site Status:
Date:
Time:
Inspector:
MAINTENANCE ITEM SATISFACTORY /
COMMENTS
UNSATISFACTORY
1. Debris Cleanout (Monthly)
Bioretention and contributing areas
clean of debris
No dumping of yard wastes into
practice
Litter (branches, etc.) have been
removed
2. Vegetation (Monthly)
Plant height not less than design
water depth
Fertilized per specifications
Plant composition according to
approved plans
No placement of inappropriate plants
Grass height not greater than 6 inches
No evidence of erosion
3. Check Dams/Energy Dissipaters/Sumps (Annual, After Major Storms)
No evidence of sediment buildup
G-10
Page 1483 of 1493
Page 1484
New York State Stormwater Management Design Manual Appendix G
MAINTENANCE ITEM SATISFACTORY /
COMMENTS
UNSATISFACTORY
Sumps should not be more than 50%
full of sediment
No evidence of erosion at downstream
toe of drop structure
4. Dewatering (Monthly)
Dewaters between storms
No evidence of standing water
5. Sediment Deposition (Annual)
Swale clean of sediments
Sediments should not be > 20% of
swale design depth
6. Outlet/Overflow Spillway (Annual, After Major Storms)
Good condition, no need for repair
No evidence of erosion
No evidence of any blockages
7. Integrity of Filter Bed (Annual)
Filter bed has not been blocked or
filled inappropriately
G-11
Page 1484 of 1493
Page 1485
New York State Stormwater Management Design Manual Appendix G
Comments:
Actions to be Taken:
G-12
Page 1485 of 1493
Page 1486
Page 1486 of 1493
Page 1487
Page 1487 of 1493
Page 1488
Page 1488 of 1493
Page 1489
Page 1489 of 1493
Page 1490
Page 1490 of 1493
Page 1491
Page 1491 of 1493
Page 1492
Page 1492 of 1493
Page 1493
Page 1493 of 1493