Text · page 1 of 5
Read the whole document on one page (all 5 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
WORKSHOP- 5:15PM. Pocket Park @ 83 N Main Street Engineer- Donald Gallo asked the Village Board to go over the final drawing and go over any final edits. Trustee Stonitsch would like to see a different color on the archway. Don explained color can be selected during construction. Simulated wood is used as it last longer finishes nice... real wood is not used in most cases. If left white it may last longer. Trustee Dybdhal confirmed with Don that the brick will be matched to the building next door. Brick samples will be pulled to select by Board. Trustee Stonitsch does not like the bicycle on archway. Changes will be made and a park name will be added to the sign. Trustee Ludwig likes the name “Village Community Park”. Trustee Dybdahl would like the font style to match the NY Forward logo “Angola” Don explained it can be worked up separately. Pressure treated timbers will be used on the L shaped planters. Trustee Dybdahl would like 6x6 used for the raised flower bed. Trustee Stonitsch would like an outlet added to the top of the shelter for a Christmas wreath. Black roof and sofit confirmed. Engineer would like to have a project completion date of October 31, 2026 Construction site will have a temporary fence. All changes will be submitted this week.