WEST SENECA COURT ROOM  DRAFT TOWN BOARD
1250 Union Road  Minutes Meeting # 2026-13
West Seneca, NY 14224  July 13, 2026

including manholes and sanitary laterals by open cut method along Orchard Park ROad from the 36"
trunk sewer to approximately East & West Road
  - spot repairs and rehabilitation, as necessary, within the Phase 10 area (FM-9 and FM-12)
  - lateral lining within FM-2 area (Covington Drive)
- Estimated total cost $11,304,000.00
- Annual cost per dwelling unit and be lowered by WQIP and WIIA grant funds
- NYSDOT has a project planned for Orchard Park Road in 2028 and the town will need to upsize the
sewer before this
- Recommended next steps:
  - apply for WQIP grant
  - adopt a Type II SEQR resolution
  - adopt a WQIP authorizing resolution
  - advance the engineering design immediately

Supervisor Dickson stated the town must eliminate the overflows and commented that taking
advantage of the NYSDOT reconstruction of Orchard Park Road could save the town money. The
motions at this meeting allow the town to apply for the grant. Councilmember Sherman questioned if
the town is committed to go through with the project if the grant is awarded to West Seneca. Mr.
Hardenbrook stated the town would need a further resolution to move forward.

Councilmember Breidenstein asked when the grant was open to apply. Mr. Hardenbrook stated
grants are announced randomly and believes this one was announced at the beginning of June.
Councilmember Breidenstein stated that while he is hopeful that the NYSDOT project along Orchard
Park Road would favor West Seneca's chances of receiving the grant, how much the engineering
designs and permitting cost. Mr. Hardenbrook stated the engineering costs would be $960,000.
Councilmember Breidenstein asked when the grant would be awarded. Mr. Hardenbrook stated in
December.

Councilmember Robertson asked if NYS would be correcting the stormwater drainage as part of their
project and if there would be an opportunity for the town to piggyback on this project. Mr.
Hardenbrook stated that it is likely NYSDOT would correct drainage and does not think the town
could piggyback on the project.

Councilmember Sherman asked if we did not receive the grant, would the town have to decide about
funding the project. Mr. Hardenbrook stated the town would need to decide how to proceed.
Councilmember Sherman asked how the $6M amount was determined. Mr. Hardenbrook stated
recent projects are used to estimate the costs and commented that the grant funds would only cover
construction costs.
4. COMMUNICATIONS TO BE VOTED ON
1. Councilmember Breidenstein re Facility Naming and Dedication Policy

Councilmember Breidenstein requested that the item be held until the next meeting.
2. Town Engineer re WQIP Grant Resolution

Motion by Supervisor Dickson, seconded by Councilmember Robertson, to adopt the following Type
II SEQR determination:

  9