Text · page 10 of 101
Read the whole document on one page (all 101 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
otherwise satisfied within sixty (60) days after the Town receives written notice thereof from the Village, at no cost to the Village. 9. OWNERSHIP OF IMPROVEMENTS 9.1 All improvements constructed as part of the Project that are permanently affixed to the Building, including, without limitation; walls, ceilings, finishes, the raised judge’s platform, and mechanical, plumbing and electrical work, shall upon installation become part of the Building and the property of the Village, without compensation to the Town except as provided in Section 9.3. The Town shall not be required to remove such improvements or restore the Court Premises to their prior condition upon expiration or termination of the 2019 Agreement. 9.2, Appliances, trade fixtures, furniture, equipment, and Town information technology, telephone, internet and security systems installed by or for the Town shall remain the property of the Town and shall be governed by Paragraphs 3 and 5 of Lease Agreement (B). 9.3 If the Village terminates the Town’s occupancy of the Court Premises under the 2019 Agreement terminates or is not renewed, other than by the Town’s voluntary eletion or default, at an time before December 31, 2038, the Village shall reimburse the Town for the unamortized portion of the Project Costs actually paid by the Town, calculated on a straight-line basis over the period from the date of substantial completion through December 31, 2038, within 90 (ninety) days after the date of completion. 10. COMPLETION, WARRANTIES AND MAINTENANCE 10.1 Upon completion, the Town shall deliver to the Village copies of the certificate of occupancy or completion (if issued), final inspection approvals, record (as-built) drawings, operation and maintenance manuals, and warranties for the Project. 10.2 The Town shall enforce all contractor guarantees and warranties for the Project, including the contractor’s one-year guarantee against defects in materials and workmanship, and to the extent assignable, shall make such warranties available to the Village for the benefit of the Building. 10.3 Following completion, the Village shall, at its sole cost, maintain, repair and replace the improvements constructed as part of the Project that constitute electrical, plumbing, HVAC and cosmetic items (including painting, flooring and ceilings) in accordance with Paragraph 3 of Lease Agreement (B), notwithstanding any provision of Paragraph 3 that could be read to require such repairs to be made at the Town’s expense, except to the extent the need for repair is caused by the fault of the Town or its guests, employees or agents. During the contractor warranty period, the Town shall enforce the contractor’s warranty obligations for defects in the Project work. 11. TERM. This Agreement shall commence on the Effective Date and shall remain in effect until the later of (a) final completion and close-out of the Project and expiration of all contractor warranty periods, or (b) the resolution of any claim arising out of the Project; provided that Sections 3.4, 7, 9 and 10.3 shall survive for so long as the 2019 Agreement (as renewed) remains in effect and thereafter as to claims arising during its term. 12. DISPUTE RESOLUTION 12.1 The Parties shall attempt in good faith to resolve any dispute under this Agreement through discussion between the Town Supervisor and the Village Mayor. Any dispute not so resolved 5 11034126v2