Southtowns Record

SUPPORTING DOCUMENTS 2A-5C3

Government
Town of Aurora
Board
Town Board
Meeting
Oct 26, 2026
Kind
Agenda packet
Topics
Audits and oversight, Budget and taxes, Public safety, Roads and traffic, Water, sewer and drainage

Original document

Same meeting

Text · page 10 of 101

Read the whole document on one page (all 101 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

otherwise satisfied within sixty (60) days after the Town receives written notice thereof from the
Village, at no cost to the Village.

9. OWNERSHIP OF IMPROVEMENTS
9.1 All improvements constructed as part of the Project that are permanently affixed to the
Building, including, without limitation; walls, ceilings, finishes, the raised judge’s platform, and
mechanical, plumbing and electrical work, shall upon installation become part of the Building and
the property of the Village, without compensation to the Town except as provided in Section 9.3.
The Town shall not be required to remove such improvements or restore the Court Premises to
their prior condition upon expiration or termination of the 2019 Agreement.
9.2, Appliances, trade fixtures, furniture, equipment, and Town information technology, telephone,
internet and security systems installed by or for the Town shall remain the property of the Town
and shall be governed by Paragraphs 3 and 5 of Lease Agreement (B).
9.3 If the Village terminates the Town’s occupancy of the Court Premises under the 2019
Agreement terminates or is not renewed, other than by the Town’s voluntary eletion or default, at
an time before December 31, 2038, the Village shall reimburse the Town for the unamortized
portion of the Project Costs actually paid by the Town, calculated on a straight-line basis over the
period from the date of substantial completion through December 31, 2038, within 90 (ninety)
days after the date of completion.

10. COMPLETION, WARRANTIES AND MAINTENANCE
10.1 Upon completion, the Town shall deliver to the Village copies of the certificate of occupancy
or completion (if issued), final inspection approvals, record (as-built) drawings, operation and
maintenance manuals, and warranties for the Project.
10.2 The Town shall enforce all contractor guarantees and warranties for the Project, including the
contractor’s one-year guarantee against defects in materials and workmanship, and to the extent
assignable, shall make such warranties available to the Village for the benefit of the Building.

10.3 Following completion, the Village shall, at its sole cost, maintain, repair and replace the
improvements constructed as part of the Project that constitute electrical, plumbing, HVAC and
cosmetic items (including painting, flooring and ceilings) in accordance with Paragraph 3 of Lease
Agreement (B), notwithstanding any provision of Paragraph 3 that could be read to require such
repairs to be made at the Town’s expense, except to the extent the need for repair is caused by the
fault of the Town or its guests, employees or agents. During the contractor warranty period, the
Town shall enforce the contractor’s warranty obligations for defects in the Project work.

11. TERM. This Agreement shall commence on the Effective Date and shall remain in effect
until the later of (a) final completion and close-out of the Project and expiration of all contractor
warranty periods, or (b) the resolution of any claim arising out of the Project; provided that
Sections 3.4, 7, 9 and 10.3 shall survive for so long as the 2019 Agreement (as renewed) remains
in effect and thereafter as to claims arising during its term.

12. DISPUTE RESOLUTION
12.1 The Parties shall attempt in good faith to resolve any dispute under this Agreement through
discussion between the Town Supervisor and the Village Mayor. Any dispute not so resolved