Text · page 84 of 101
Read the whole document on one page (all 101 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
FIXED FEE Spreadsheet Azar Design Estimate# 19 PIN # 5765.55.121 Overhead 138% Approved OH Orig Agree Total Fixed Fee 15,893.99 15,893.99 Total Est Cost 160,698.92 160,698.92 Subconsultant 0.00 0.00 Estimate # 19 Direct Tech Labor (reg) 4,755.71 Direct Tech Labor (OT) 0.00 DNSC 0.00 Overhead 6,562.88 11,318.59 Fixed Fee | 0.00] Subconsultant 0.00 TOTAL 11,318.59 Fixed Fee = [(Direct Tech Labor + Overhead) x 11% ) DNSC = Direct Non-Salary Costs excluding subconsultants but including subcontractors