Planning Board agenda packet — October 28, 2026 (full text)
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
DRAFT • OCTOBER 2026
CHAPTER 300
ZONING
CITY OF LACKAWANNA • NEW YORK
Page 21
This Space Left Intentionally Blank
Page 22
CONTENTS I OF II
CONTENTS
PART 1 §6-5 Open Space 45
Title and Purpose §6-6 Common Property 45
§1-1 Purpose 1
PART 7
§1-2 Authority 2 General Development Standards
§1-3 Title 2
§7-1 Measurements and Exceptions 47
§1-4 Repealer 2
§1-5 Application 2 §7-1-1 Building Height 47
§1-6 Interpretation 2 §7-1-2 Corner Visibility 47
§7-1-3 Driveways 47
§1-7 Official Record 2
§7-1-4 Flag Lots 47
PART 2 §7-1-5 Yards on Corner Lots 48
Word Usage and Definitions §7-2 Circulation, Parking, Loading and Stacking 48
§2-1 Word Usage 3 §7-2-1 Purpose 48
§2-2 Definitions 4 §7-2-2 Applicability 48
PART 3 §7-2-3 No Minimum Parking Requirements 48
Zoning Districts and Map §7-2-4 Continuation of Facilities 48
§7-2-5 Fractional Requirements. 48
§3-1 Districts Established 15
§7-2-6 General Provisions 49
§3-2 Zoning Map 15 §7-2-7 Off Street Parking
§3-3 Interpretation of Boundaries 15 Space and Parking Lot Design 49
§7-2-8 Parking, Loading,
PART 4
and Stacking Area Design Requirements 49
Permitted Uses §7-2-10 Bicycle Parking 50
§4-1 Use Schedule 17 §7-2-11 Electric Vehicle Charging Stations 50
§4-2 Uses Not Listed 24 §7-2-12 Residential Parking Requirements 50
PART 5 §7-2-9 Shared Parking 50
District Regulations §7-2-13 Loading Facilities 51
§7-2-14 Stacking 51
§5-1 Residential District 1 (R-1) 25
§5-2 Residential District 2 (R-2) 26 §7-4 Landscaping 52
§5-3 Residential District 3 (R-3) 27 §7-4-1 Purpose 52
§5-4 Central Business District (CBD) 28 §7-3 Erosion and Sedimentation 52
§5-5 Neighborhood Transition District (NT) 29 §7-4-2 Applicability 53
§5-6 Regional Commercial (RC) 30 §7-4-3 General Requirements 53
§5-7 Enterprise District (ENT) 31 §7-4-4 Buffers and Screening 53
§5-8 Open Space District (OS) 32 §7-4-5 Dumpsters and Refuse Containers 54
§5-9 Bethlehem Redevelopment Area (BRA) 33 §7-4-6 Fences 54
§5-10 Light Industry Overlay (LI) 39 §7-4-7 Parking Lots and Vehicle Use Areas 54
§5-11 Medium Industry Overlay (MI) 40 §7-4-8 Enforcement and Maintenance 55
§5-12 Heavy Industry Overlay (HI) 41 §7-5 Lighting 55
§5-13 Intermodal Overlay (INT) 42 §7-6 McKinley Parkway 56
§5-14 Lakefront Open Space Overlay (LOS) 43 §7-7 Outdoor Storage and Display 56
§5-15 Historic Property Overlay (HPO) 44 §7-8 Seaway Trail 57
§7-9 Signs 57
PART 6
Planned Unit Developments (PUD) §7-9-1 Purpose 57
§7-9-2 Definitions 57
§6-1 Purpose 45
§7-9-3 Prohibited Signs 58
§6-2 Uses 45
§7-9-4 Signs Exempt from Regulation 58
§6-3 Location 45 §7-9-5 General Standards 58
§6-4 Minimum Area 45
Page 23
II OF II CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§7-9-6 Measurement 59 §8-15-10 Safety 87
§7-9-7 Signs Requiring a Permit 59 §8-15-11 Permit Timeframe and Abandonment 88
§7-9-8 Sign Area 60 §8-15-12 Enforcement 88
§7-10 Smokes Creek 61 §8-15-13 Severability 88
§7-11 Sound 61 §8-16 Short-Term Rentals 88
§7-12 Stormwater Management 61 §8-17 Wind Energy Conservation Systems (WECS) 88
§7-12-1 Findings; purpose. 61 §8-17-1 Purpose 88
§7-12-2 Definitions 62 §8-17-2 Definitions 89
§7-12-3 Applicability; §8-17-3 Applicability 89
Exemptions; Conflict with Other Provisions 64 §8-17-4 Permits required;
§7-12-4 Procedure 65 Allowable/Zoning Districts 89
§7-12-5 Stormwater Pollution Prevention Plans 66 §8-17-5 Applications for Wind Energy Facilities 90
§7-12-6 Performance and Design Criteria 68 §8-17-6 Wind measurement towers 99
§7-12-7 Maintenance, §8-17-7 Permit Revocation 100
inspection and §8-17-8 Fees and costs 100
repair of stormwater facilities. 68 §8-17-9 Enforcement;
§7-12-8 Administration and Penalties for Offenses; Remedies 100
Enforcement; Penalties for Offenses; Fees 69
§7-13 Utilities 72 PART 9
Non-Conforming Uses, Lots, and Structures
PART 8 §9-1 Purpose 101
Additional Use Regulations §9-2 Nonconforming Uses 101
§8-1 Purpose 73 §9-3 Nonconforming Structures 102
§8-2 Applicability 73 §9-4 Nonconforming Lots 102
§8-3 Accessory Dwelling Units 73 §9-5 Nonconforming Parking,
§8-4 Accessory Structures 74 Loading, and Stacking Facilities 103
§8-5 Adult Uses 74 §9-6 Repairs and Maintenance 103
§8-6 Animal Service Facilities 76
PART 10
§8-7 Automotive Service Facilities 76
Administration
§8-8 Cannabis Facilities 76
§10-1 Zoning Officer 105
§8-9 Cemeteries 76
§10-2 Planning and Development Board 106
§8-10 Home Occupations 76
§10-3 Zoning Board of Appeals 107
§8-11 Manufactured Homes 77
§8-12 Manufactured Home Parks 77 PART 11
§8-13 Neighborhood Garden 77 Permit and Site Plan Procedures;
§8-14 Community Scale Agriculture 77 Enforcement and Penalties
§8-15 Solar Energy Systems 78 §11-1 Administrative Standards 111
§8-15-1 Authority 78 §11-2 Flood development permits. 111
§8-15-2 Statement of Purpose 78 §11-3 Building Permits 136
§8-15-3 Definitions 78 §11-3 Building Permits 136
§8-15-4 Applicability 80 §11-4 Zoning Permits. 136
§8-15-5 General Requirements 80 §11-5 Site Plan Review. 137
§8-15-6 Permitting §11-6 Notice and Public Hearing Requirements. 142
Requirements for
Tier 1 Solar Energy Systems 81 §11-7 Use and Area Variances 142
§8-15-7 Permitting §11-8 Amendments. 144
Requirements for §11-9 Special Use Permits. 145
Tier 2 Solar Energy Systems 82 §11-10 Enforcement and Penalties. 148
§8-15-8 Permitting §11-11 Fees 148
Requirements for
Tier 3 Solar Energy Systems 83
§8-15-9 Permitting
Requirements for
Tier 4 Solar Energy Systems 87
Page 24
PART 1 Title and Purpose 1 OF 148
PART 1
TITLE AND PURPOSE
§1-1 PURPOSE
A. The purpose of this chapter is to provide for the orderly and equitable development of the City of
Lackawanna in accordance with the goals and land use patterns outlined in the City of Lackawanna
Comprehensive Plan. The Zoning Chapter is developed to achieve, among others, the following objectives:
1. Protect the character and values of open 6. Encourage the efficient use of public
space, residential, commercial, industrial and infrastructure while preventing the
institutional land uses; overcrowding of land and excessive
2. Regulate the location and intensity of concentration of population
buildings and uses; 7. Provide adequate open spaces for light, air
3. Preserve and protect significant natural and outdoor uses;
resources that contribute to the health 8. Protect persons and property from damage
and wellness of the local and regional and injury due to fire or flood;
ecosystems, 9. To accomplish the specific intents and goals
4. Preserve and promote the aesthetic values set forth in the introductions to the respective
of the City to ensure that structures and sections; and,
land use arrangements are harmonious with 10. To protect the community from visual
surrounding structures and land uses; pollution resulting from the unregulated use
5. Facilitate the provision of adequate of signs and other advertising devices.
transportation and parking facilities to
maximize the utility of transportation
infrastructure, protect the safety of
pedestrians, cyclists, and motorists, and
promote the convenience of consumers and
employers;
Page 25
2 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§1-2 AUTHORITY §1-6 INTERPRETATION
This Zoning Chapter is adopted under the grant of A. Conflict with other laws and regulations.
power set forth in §20 of NYS General City Law. 1. The provisions of this chapter shall not
annul or in any way interfere with existing
§1-3 TITLE deed or plat restrictions, easements or other
agreements between persons, codes, laws,
This chapter shall be known and may be cited as
rules, regulations or permits previously
the “City of Lackawanna Zoning Law" for the City of
adopted or issued, except those ordinances
Lackawanna, County of Erie, State of New York.
or sections which are contrary to, or in
§1-4 REPEALER conflict with, this Zoning Chapter.
2. In their interpretation and application, the
A. The Zoning Chapter of the City of Lackawanna provisions of this chapter shall be held to
adopted January 22, 2002, the corresponding be the minimum requirements, adopted for
Zoning Map, together with all subsequent the promotion of the public health, safety
amendments, are repealed on the effective date and welfare. Whenever the requirements
of this Zoning Chapter. of this chapter are inconsistent with the
requirements of any other lawfully adopted
§1-5 APPLICATION rules, regulations or ordinances, the most
A. General application. This chapter shall apply restrictive, or that imposing the highest
on its effective date to all uses that have not standards, shall govern.
commenced and structures that have not been 3. Minimum requirements declaration.
constructed regardless of the status of permits 4. In the interpretation, application and
or certificates of occupancy issued pursuant to enforcement of the provisions of this chapter,
the New York State Uniform Fire Prevention and the provisions thereof shall be held to
Building Code. be minimum requirements necessary for
B. Buildings under construction. Nothing herein the protection of the public health, safety,
contained shall require any change in plans, convenience, comfort and prosperity and
construction or designated use of a building for general welfare of the City and shall apply
which a building permit has been issued and uniformly to each class or kind of structure or
which the entire building shall be completed land therein, except as otherwise provided in
within one year from the date of the passage of this chapter.
this chapter.
C. Future projects. No building, structure or §1-7 OFFICIAL RECORD
land shall hereafter be used or occupied, The official record of this Zoning Chapter and
and no building or structure shall be erected, any amendments thereto is kept by the City of
relocated, extended, enlarged or altered except Lackawanna City Clerk, all other representations,
in conformity with the regulations hereinafter digital or otherwise are a reproduction.
designated for the district in which such building,
structure or land is located.
Page 26
PART 2 Word Usage and Definitions 3 OF 148
PART 2
WORD USAGE AND DEFINITIONS
§2-1 WORD USAGE
Except where specifically defined, all words used in this chapter shall carry their customary meanings. The
following rules shall apply to the text of this chapter:
A. Words in their present tense include the future. H. The word "and" indicates that all connected
B. Words in the singular include the plural and the items, conditions, provisions or events shall apply.
plural the singular. I. The word "or" indicates that the connected items,
C. The word "shall" is intended to be mandatory. conditions, provisions or events may apply singly
or in any combination.
D. The word "lot" shall include the word "plot" or
"parcel." J. The words "either ...or" indicate the connected
items, conditions, provisions or events may apply
E. The word "person" shall include an individual, singly or in any combination.
firm, corporation, society, agency or institution.
K. Any question as to the precise meaning of any
F. The words "used" or "occupied" as applied to any word used in this chapter may be appealed to the
land or building shall be construed to include Zoning Board of Appeals and clarified under their
the words "intended, arranged or designed to be
powers of interpretation.
used or occupied."
G. A building or structure includes any part.
Page 27
4 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
A
§2-2 DEFINITIONS
#
1-Unit Housing. One-unit housing, or single-family
Accessory Dwelling Unit. A separate dwelling unit
that is within or substantially attached to a principal
residential dwelling used for the living, sleeping,
cooking, and bathroom facilities of individuals for a
housing, refers to a single dwelling unit built as a period of time longer than 6 months.
principal use on an individual lot. 1-unit housing can
Accessory Use or Structure. A use or structure
be detached, semi-detached, or attached (like a
which is customarily incidental and subordinate to the
townhome)
principal use of a lot, water area, or a building, and
2-Unit Housing. Two-unit housing refers to two located on the same lot or water area therewith.
dwelling units built as a principal use on an individual
ADT. Average daily traffic.
lot. 2-unit housing, sometimes called duplexes,
can appear as two units in the same building, two Adult Uses. Whenever used in this Zoning Chapter,
buildings attached, or two buildings detached. the words “adult use” or “adult uses” apply to the
following types of establishments:
3-Unit Housing. Three-unit housing refers to three
dwelling units built as a principal use on an individual Adult Bookstore. An establishment which has as
lot. 3-unit housing, sometimes called triplexes, can a substantial or significant portion of its stock-
appear as three units in the same building, three in-trade books, pamphlets, magazines and other
buildings attached, or three buildings detached periodicals, sculptures, photographs, pictures,
slides, videotapes, films or sound recordings and
Multi-Unit Housing. Multi-unit housing refers to four
which establishment excludes any minor by reason
or more dwelling units built as a principal use on an
of age.
individual lot. These building types, often referred to
as multi-family housing, apartments, or quadplexes Adult Entertainment Cabaret. A public or private
(if four units exactly), are designed to accommodate nightclub, bar, restaurant or similar establishment
multiple households within a single building, or can which presents topless or bottomless dancers,
appear as a group of interconnected structures, like go-go dancers, strippers, male or female
condominiums, townhouses, or large apartment impersonators, exotic dancers or other similar
blocks. entertainment, and which establishment excludes
any minor by reason of age.
Adult Video Store. An establishment having as a
substantial or significant portion of its stock-in-
trade videotapes or films for sale or viewing on
premises by use of motion picture devices, video
equipment or other coin-operated means and
which establishment excludes any minor by reason
of age.
Peep Show. A theater which presents material in
the form of live shows, films or videotapes viewed
from an enclosure for which a fee is charged and
which excludes any minor by reason of age.
Page 28
PART 2 Word Usage and Definitions 5 OF 148
Massage Establishment. Any establishment Animal Service Facilities. establishments primarily
having a fixed place of business where massages engaged in the care, grooming, training, boarding,
are administered for pay, including but not limited or medical treatment of domesticated animals. This
to massage parlors, sauna baths and steam baths. use includes, but is not limited to, veterinary clinics,
This definition shall not be construed to include a animal hospitals, pet grooming salons, boarding
hospital, nursing home, medical clinic or the office kennels, pet daycare centers, and animal training
of a physician, surgeon, chiropractor, osteopath or facilities.
duly licensed physical therapist or duly licensed
Automotive Sales. business primarily engaged in
massage therapist, or barber shops or beauty
the retail sale, lease, or rental of new or used motor
salons in which massages are administered only
vehicles, including but not limited to cars, trucks,
to the scalp, face, neck or shoulders. This definition
motorcycles, and recreational vehicles.
shall also exclude health clubs that have facilities
for physical exercise such as tennis courts, utomotive Service Stations. A commercial
racquetball courts or exercise rooms and which do establishment primarily engaged in the sale of motor
not receive their primary source of revenue through fuel, automotive repair, maintenance, and related
the administration of massages. services. Automotive services uses can include
fuel dispensing (gas stations), minor and major
Adult Motel. A motel which excludes minors
vehicle repairs, oil changes, tire services, and engine
by reason of age or which make available to
diagnostics, as well as auto detailing services such as
its patrons in their rooms films, slide shows or
cleaning, polishing, and cosmetic vehicle restoration.
videotapes which if presented in a public movie
theater would exclude any minor by reason of age.
B
Adult Theater. A theater that customarily presents
motion pictures, films, videotapes or slide shows
and which excludes minors by reason of age.
Body Painting Studio. An establishment or
business which provides the service of applying Berm. A man-made mound of earth in excess of
paint or other substance whether transparent two feet in vertical height used to shield or buffer
or nontransparent to or on the human body and properties from adjoining uses, highways, noise or
which excludes minors by reason of age. control the flow of surface water.
Adult Model Studio. Any establishment where, for Building. A structure designed, used, or intended to
any form of consideration or gratuity, figure models be used as a shelter of humans, animals or objects,
are provided to be observed, sketched, drawn, permanently fixed to a site or hauled to a site using an
painted, sculptured, photographed or similarly external source of propulsion. Mobile homes shall be
depicted by persons other than the proprietor, buildings for purposes of this code.
paying such consideration or gratuity and Building Area. The maximum horizontal projected
which excludes any minor by reason of age. This area measured from the exterior walls of the building
provision shall not apply to any school of art which and its accessory buildings. The building area
is operated by an individual firm, association, includes all overhanging building parts such as the
partnership, corporation or institution which meets edges of roofs and window ledges. The extension of
the requirements established in the NYS Education the building area across lot lines is prohibited.
Law for the issuance or conferring of and is in fact
authorized to issue or confer a diploma.
Page 29
6 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
Building Coverage. That percentage of the plot or Cluster Development. A planned development of
land area covered by the building area. five or more acres in which lots are plotted which
Building Height. The vertical distance measured have less than the minimum lot size and setback
from the average level of the ground surrounding requirements but which have access to common
the building to the highest point of the roof, but not open space that is part of the overall site development
including: chimneys, spires, towers, tanks and similar plan approved by the Planning and Development
projections; elevator or stair bulkheads, roof tanks Board. However, not more than the maximum density
or cooling towers, provided such structures do not of dwelling units permitted by the existing zoning
occupy more than 10% of the roof area; or parapet shall be allowed.
walls less than four feet high. Common Party Wall. Any interior wall or portion
Building Inspector. The Building Inspector of the City thereof located between adjacent residential units or
of Lackawanna, New York. uses provided for the separation of the individual and
separate living or use areas.
Building, Principal. A structure in which the principal
use of the site is situated or conducted. In any Common Property. A parcel or parcels of land
residential district, any dwelling shall be deemed together with improvements, the use of which is
to be a "principal building" on the lot on which the shared by the owners or occupants of the individual
structure is located. building sites.
Comprehensive Plan. A plan as defined and adopted
C
in accordance with § 20, Subdivisions 24 and 25
of the General City Law of the State of New York
and any amendments or master plans attached
thereto by resolution of the City Council of the City of
Lackawanna.
Car Wash. An establishment for the washing of motor
Community Scale Agriculture. A form of agricultural
vehicles, which may employ production-line methods,
activity that has a gross area of greater than 1,000
mechanical devices, staffed hand wash facilities, or
gross SQFT intended primarily to serve local
unstaffed self-wash facilities.
markets and meet the food needs of the surrounding
Cemetery. Land or structures dedicated to the community. These practices typically occur on
internment of human or animal remains. small to medium-sized parcels of land and include
Crematory/Crematorium(s). A facility in which the the cultivation of crops or related food production
remains of deceased human beings are processed by activities.
cremation. Condominium. A building or group of buildings in
Civic/Government Buildings. Offices owned, which residential, business or industrial units are
operated, or occupied by a government agency, owned individually while the structure, common areas
including government officials and departments, and facilities are owned jointly by all the owners on a
social service facilities, public works facilities, and proportional basis.
courthouses. Council. The City Council of the City of Lackawanna,
Erie County.
County. Erie County, New York.
Cultural Facility. A facility open to the public for
cultural services and exhibitions including, but not
limited to, museums, cultural centers, historical
societies, and libraries operated by a government.
Page 30
PART 2 Word Usage and Definitions 7 OF 148
D
Day Care Center. Care of seven or more individuals
E
Enlargement. An increase in floor area of an existing
away from their own home, for less than 24 hours building or an increase in the size of an existing
a day, in a facility licensed by the state for such structure or an increase in the area of land use for an
purposes, for compensation or otherwise, for at least existing open space. The word "enlargement" shall
three hours a day. include the word "extension."
Data Center. An establishment engaging in Electric Vehicle Charging Station. A structure that
the storage, management, processing, and/or supplies electric energy for the recharging of electric
transmission of digital data, and housing computer vehicles, such as plug-in electric vehicles, including
and/or network equipment, systems, servers, electric cars, neighborhood electric vehicles and
appliances, and other associated components related plug-in hybrids.
to digital data operations. Essential Public Services. The erection, construction,
Density. The number of individual residential units alteration or maintenance by public utilities, City
divided by the buildable area available for residential or other governmental agencies of underground or
units reduced by an allowance for recreation overhead gas, electrical, or water transmission or
space and dedication of streets and other public distribution systems, including poles, wires, mains,
improvements. Expressed as units per acre. drains, sewers, pipes, conduits, cables, fire alarm
Development. Any man-made change to improved boxes, police call boxes, traffic signals, hydrants and
or unimproved real estate, including but not limited to other similar equipment, buildings and accessories in
buildings, structures, minim, dredging, filling, grading, connection therewith, reasonably necessary for the
paving, excavation or drilling. furnishing of adequate service by such public utilities
or City or other governmental agencies or for the
Drive-Through/Drop-Off Window. An outdoor public health or safety or general welfare.
service window or similar area that allows for a
service to be provided from a building to persons in
F
vehicles.
Dwelling. Any building or portion thereof designed or
used exclusively as the residence or sleeping place of
one or more persons, except a manufactured home or
camping trailer. Farmers Market. an organized market, conducted on
a recurring basis, where two or more vendors offer
Dwelling Unit. One or more rooms, including cooking
agricultural products, food products, and related
facilities and sanitary facilities in a dwelling structure,
goods for sale directly to the public. A farmers’ market
designed as a unit for owner occupancy, rent or lease
may be held indoors or outdoors and may include
on a weekly, monthly or longer basis by not more than
products grown, raised, produced, or processed by
one family for living and sleeping purposes.
participating vendors. This definition does not include
a grocery store, or other retail businesses that sell
food or other goods directly to consumers.
Page 31
8 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
H
Floor Area. The total horizontal area of a building as
outlined by its exterior main walls, not including any
space the habitation of which is prohibited by any law,
built-in or attached garages, porches, or terraces.
Footcandle. The amount of light that is produced by a Historic Resources. Any historic building, structure,
candle at the distance of one foot. A footcandle is also facility, site or prehistoric site that is listed on the
the equivalent of one lumen per square foot. State and/or National Registers of Historic Places.
Any historic building, structure, facility, site or district
Fraternal Organization/Private Club. A facility for the
or prehistoric site that has been proposed by the NY
use of a membership organization or association with
Board on Historic Preservation for a recommendation
elected officers and directors, pursuant to a charter
to the State Historic Preservation Officer for a
or bylaws, that excludes the general public from its
nomination for inclusion in the National Register
premises and holds property for the common benefit
of Historic Places. Any locally significant historic
of its members.
resource designated pursuant to Article 5-K of the
Freight Terminal. A facility for freight pick-up, NYS General Municipal Law is also included.
transfer, or distribution by rail, truck, or water.
Home Occupation. an occupation carried on inside
Funeral Services. A facility where the deceased are of a dwelling unit by the resident thereof, provided
prepared for burial displays and for rituals before that the use is limited in extent and incidental and
burial or cremation. Such facilities may include secondary to the use of the dwelling unit and does
chapels, crematoriums, and showrooms for the not change the character thereof.
display and sale of caskets, vaults, urns, and other
items related to burial services.
G I
Industrial Uses, Light. businesses that are engaged
in the processing, assembly, packaging, storage,
Garage, Private. A building, accessory to dwellings, and distribution of products. Light industrial uses
used exclusively for the parking or temporary storage generally take place withing an enclosed building and
of motor vehicles, boats, and trailers. generate limited noise, odor, traffic, vibration, or air
Group Home. A dwelling licensed, certified, or pollution.
accredited by the appropriate local, state, or federal Industrial Uses, Medium. Enterprises in which goods
agencies, in which unrelated persons with disabilities, are generally mass-produced from raw materials
including those who have undergone treatment through the use of an assembly line or similar
for alcohol or drug addiction, function as a single process, usually for sale to wholesalers or other
housekeeping unit and share responsibilities, meals, industrial or manufacturing uses. Medium industrial
recreation, social activities, and other aspects of uses produce moderate external effects such as
residential living. A group home does not include a smoke, noise, soot, dirt, vibration or odor. Medium
residence that services persons as an alternative to industrial uses shall exclude enterprises which pose
incarceration, or that services people transitioning significant risks due to the involvement of explosives,
from incarceration. radioactive materials, poisons, pesticides, herbicides
or other hazardous materials in the manufacturing or
other process.
Page 32
PART 2 Word Usage and Definitions 9 OF 148
J
Lot, Corner. A lot abutting upon two or more streets
at their intersection or upon two parts of the same
street forming an interior angle of less than 135°.
The point of intersection of the street lot lines is the
Junkyard. A building, structure, parcel of land or "corner."
portion thereof, used for the storage, abandonment Lot, Coverage. The portion of a site that is covered by
or sale of junk, scrap material or similar waste, impervious surfaces, including structures and paving.
including the dismantling, demolition or abandonment
Lot, Depth. The mean horizontal distance between
of automobiles, other vehicles, machinery or parts.
the front and rear lot lines.
Automobile junkyards as defined in General Municipal
Law § 136 shall be included within this definition. Lot, Frontage. The horizontal distance between the
“Junkyard” shall be synonymous with “salvage yard.” side lot lines measured at the point where the side lot
lines intersect the street right-of-way. All sides of a lot
that abut a street shall be considered lot frontage. On
K
curvilinear streets, the arc between the side lot lines
shall be considered the lot frontage.
Lot Line, Front. The line separating the lot from the
public right-of-way.
Kennel. An establishment where four or more dogs
over six months of age are boarded, bred, raised, and Lot Line, Rear. The lot line opposite and most distant
trained. from the front lot line.
Lot Lines. The property lines bounding the lot.
L
Lot Line, Side. Any lot line other than a front or rear
lot line. A side lot line separating a lot from a street is
called a "side street lot line."
Lot, Interior. A lot other than a corner lot.
Lodging. establishments primarily engaged in Lot, Through. An interior lot having frontage on more
providing temporary accommodation for travelers, than one street.
tourists, and other short-term occupants (less
Lot Width. The distance between the two side lot
than 3 months). This includes, but is not limited to,
lines measured at the required setback line, which is
hotels, motels, or other extended stay commercial
determined by the minimum front yard permitted in
accommodations. inns, bed-and-breakfasts, and
the district.
similar facilities that offer sleeping accommodation.
Short-term rentals are not considered under this
definition and are prohibited within the City of
Lackawanna.
Lot. A parcel or piece of land, designated as a
separate parcel on a plat map or deed filed or
recorded in the office of the Erie County, New York
Clerk, occupied or intended to be occupied by a
principal building or a group of such buildings and
accessory buildings, or utilized for a principal use and
uses accessory or incidental to the operation thereof,
together with such open spaces as required by this
chapter, and having frontage on a public street.
Page 33
10 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
M
Medical Office/Health Care Facility (Major).
N
Neighborhood Garden. A small-scale agricultural
hospitals and similar facilities engaged primarily in use that has an area of less than 1,000 gross SQFT
providing diagnostic services, and extensive medical intended primarily for personal consumption,
treatment, including surgical and other hospital community sharing, or donation. Neighborhood
services. These establishments have organized gardens typically consist of individual or shared plots
medical staff, inpatient beds, and equipment and used for the cultivation of vegetables, fruits, herbs,
facilities to provide complete health care. May and ornamental plants.
include on-site accessory uses such as clinics and Nonconforming Lot, Use or Structure. A lot, use
laboratories, retail uses and emergency heliports. or structure or land lawfully occupied at the time of
Medical Office/Health Care Facility (Minor). A the enactment of this chapter by a use that does not
facility other than a hospital where medical, dental, conform to the regulation of the district in which it is
mental health, surgical, and/or other personal situated. The definition of nonconformin.
health care services are provided on an outpatient
O
basis. Includes medical offices (for example,
offices for chiropractors, dentists, medical doctors,
optometrists, prescription opticians, psychologists,
etc.), outpatient facilities which may include surgery,
urgent care facilities, dental laboratories, and medical
laboratories. Minor medical office/health care facility Overlay Zone. Zoning districts that superimpose
uses can include but are not limited to: additional requirements upon a base zoning district to
protect certain critical features and resources. Where
Manufactured Home. A structure, transportable in
the standards of the overlay and base zoning district
one or more sections, which is built on a permanent
are different, the more restrictive standards shall
chassis and designed to be used as a dwelling with
apply.
or without a permanent foundation when connected
to the required utilities, and includes the plumbing,
P
heating, air-conditioning, and electrical systems
contained in the structure.
Manufactured Home Park. A parcel of land held by
one owner that has been planned and improved for
the placement of two or more mobile homes for living Personal Services. Businesses providing personal
purposes. or household services typically by appointment or
on a walk-in basis during normal business hours
Municipality. The City of Lackawanna, New York.
with some limited weekend hours. Examples include
barber and beauty shops, nail salons, spas, shoe
repair, tailors, massage therapists, dry cleaning
and laundry pickup and drop-off locations without
on-site processing equipment and other personal or
household services accomplished on or off site.
Page 34
PART 2 Word Usage and Definitions 11 OF 148
R
Place of Worship. A facility primarily used for
religious ceremonies, services, and activities
conducted by a faith-based organization. This use
includes, but is not limited to, churches, temples,
synagogues, mosques, and similar religious Railway Facilities. Facilities for switches, spurs,
institutions. tracks, structures, rail yards, and other facilities used
Places of Assembly. A facility primarily used for in connection with the transportation of persons or
gatherings of people for civic, cultural, educational, goods by rail, including related equipment such as
social, or entertainment purposes. This use includes, locomotives and shipping containers.
but is not limited to, auditoriums, conference centers, Recreation Facility, Indoor. A facility for spectator
banquet halls, event venues, theaters, community and participatory uses conducted within an enclosed
centers, and similar establishments designed to building, such as movie theaters, sports arenas,
accommodate groups of people. bowling alleys, tumbling centers, ice rinks, roller rinks,
Planning and Development Board. The City of video game arcades, indoor child play centers, and
Lackawanna Planning and Development Board. pool halls. Recreation Facility, Outdoor - A facility
for spectator and participatory uses conducted
Professional Office. A commercial or institutional
outdoors or within partially enclosed structures, such
establishment primarily used for conducting business,
as fairgrounds, campgrounds, batting cages, drive-in
administrative, or professional services. This use
movie theater, recreational vehicle parks, petting zoos,
includes, but is not limited to, offices for businesses,
golf courses, miniature golf courses, and amusement
government agencies, nonprofit organizations,
parks.
and professionals such as attorneys, accountants,
consultants, architects, engineers, and similar Recycling Facility. A building in which discarded
occupations. Professional Offices do not include retail nontoxic objects and materials are sorted and
sales or the on-site storage of goods. reclaimed using means that do not require chemical,
electrical, or heating processes. This term shall
Public Park/Open Space. A site reserved for active or
specifically exclude the reclamation or treatment
passive recreation or natural resources protection.
of any liquids, gases, vehicles or parts thereof,
Public Safety Facility. A facility operated by a machinery, tools, or toxic solids. This term further
public safety agency, including fire stations and excludes the outdoor stockpiling of material to be
firefighting facilities, police and sheriff substations processed.
and headquarters, emergency medical services
Research & Development Facility. A facility
substations.
where research and development is conducted in
Public Utility. Facilities and services that primarily industries including, but not limited to, biotechnology,
serve local distribution needs, including, but not pharmaceuticals, medical instrumentation or
limited to, water and sewer pump stations, electrical supplies, communication and information technology,
transforming substations, water conveyance stations, electronics and instrumentation, and computer
gas regulating stations, telephone exchange/ hardware and software. A research/laboratory
switching centers, and emergency communication facility does not involve the manufacture, fabrication,
warning/ broadcast facilities. processing, or sale of products, with the exception of
prototype development.
Page 35
12 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
Residential Care Facility. A licensed care facility School, Vocational or Trade. A secondary or higher
that provides 24-hour medical or non-medical care education facility primarily teaching usable skills that
to persons in need of personal services, supervision, prepares students for jobs in a trade or in the arts,
protection, or assistance essential for sustaining the industry, construction, or commerce, and meeting all
activities of daily living. Residential care facilities applicable state requirements for a facility of its type.
include nursing homes, independent living, assisted Self-Storage. A building or group of buildings
living, continuum of care, and hospice facilities. in a controlled access and fenced outdoor
Restaurant/Tavern. A business enterprise engaged area that contains varying sizes of individual,
in serving and preparing food and beverages selected compartmentalized, and controlled access stalls or
from a full menu by patrons seated at a table or lockers for the storage of customers' goods or wares.
counter and consumed on the premises. Alcoholic Short Term Rental. The rental of a dwelling unit for a
beverages may also be sold for consumption on the period of time between 1 and 30 days.
premises
Site Plan. Site plans shall, in narrative or graphic
Retail Establishment. A business primarily engaged form, illustrate the intended design, arrangement
in the sale of goods, merchandise, or consumer and planned improvements to the land and describe
products directly to the general public for personal the proposal's physical, social and economic effects
or household consumption. This use typically on the community. The terms "site plan" and "site
includes, but is not limited to, department stores, development plan" are interchangeable.
specialty shops, supermarkets, convenience stores,
Slaughterhouse. A building or part thereof or
pharmacies, and similar commercial enterprises.
premises used or kept for the purpose of killing,
Retail establishments may operate within standalone
dressing or packing any cattle, sheep, hogs, calves
buildings, shopping centers, or mixed-use
or other animals, or the meat thereof, intended for
developments and may include incidental services
human consumption.
related to the sale of goods, such as delivery or repair
services, provided they remain subordinate to the Solar Energy System. See §8-15: Solar Energy and
primary retail function. Battery Energy Storage Systems
Storage Yard. The use of land to store material,
S
equipment, or vehicles for a period greater than 24
hours, and any structures associated with the outdoor
storage.
Structure. Anything constructed, the use of which
Scenic Resource. Any road, highway, lane, district requires permanent location on the ground or
or corridor designated pursuant to Article 49 of the attachment to something having permanent location
NYS Environmental Conservation Law. Any area on the ground, including stationary and portable
designated a Scenic Area of Statewide Significance carports.
pursuant to the NYS Coastal Management Program is Swimming Pool. Any receptacle for water having a
also included. depth at any point of more than two feet, or having
School, Public or Private. An educational facility a surface area exceeding 250 square feet, which
concerned with the teaching of students which is intended for recreation purposes, and including
satisfies the applicable laws of the State of New York all appurtenant decks, walks and equipment
for students in including but not limited to pre-school, constructed, installed, and maintained in or above the
early childhood learning centers, elementary or ground outside of the principal structure to which the
secondary levels of education. Accessory facilities pool is accessory
may include recreational fields, gymnasiums,
auditoriums, and stadiums.
Page 36
PART 2 Word Usage and Definitions 13 OF 148
T
Telecommunication Facility. Any commercial
U
Utility Shed (Shed). An accessory building used or
equipment used in connection with the provision of intended for use as vehicle or equipment storage.
wireless communication services, including cellular Use. The specific purpose for which land, water or a
telephone services, personal communications building or structure is designed, arranged, intended
services, radio and television broadcast or for which it is or may be occupied or maintained.
communications and private radio communications The term "permitted use" or its equivalent shall not be
services, and are regulated by the Federal deemed to include any nonconforming use.
Communications Commission, both in accordance
with the Telecommunications Act of 1996 and other
V
federal laws. A "telecommunication facility" shall
include monopole, guyed, or latticework tower(s),
as well as antenna(s), switching stations, principal
accessory telecommunication equipment and
supporting masts, wires, structures, and buildings. Vehicle Use Area. an area primarily used for parking,
Townhouse. A building or dwelling designed for or circulation, and storage of vehicles, including but not
occupied by no more than one family and attached to limited to parking lots, loading areas, stacking spaces,
other similar buildings or dwellings by not more than and driveways.
two common walls extending from the foundation to
W
the roof thereof and providing two direct means of
access from the outside. A townhouse is individually
owned, with an owner receiving a deed enabling him/
her to sell, mortgage or exchange his/her dwelling
unit independent of the owners of any other dwelling
Warehouse & Distribution Facility. A facility for the
unit attached thereto by common wall.
storage, wholesaling, and distribution of goods. If a
Trade and industrial schools. An educational warehouse/distribution use is ancillary to another
institution focused on workforce training by providing principal use and has a floor area of less than 10,000
vocational, technical, or skilled trades instruction square feet, it is considered part of the principal use
to prepare individuals for employment in various and is not considered a separate principal use.
industries. This use includes, but is not limited to,
Waste Transfer Station. A facility for the collection,
training programs for automotive repair, welding,
storage, and transference of solid waste, which may
plumbing, electrical work, carpentry, cosmetology,
include the collection, storage, processing, and
culinary arts, manufacturing, and mechanical trades.
transference of recyclables, and organic and yard
Training Facility. A secure building or lot owned, waste. A waste transfer facility does not include
operated, or occupied by a governmental agency or industrial or sanitary landfills, or waste incineration
public authority to provide instructional, practical, facilities.
and tactical training for public safety and emergency
Water Line, Mean. The annual average water height
protection personnel. This includes, but is not limited
of a water body.
to, law enforcement training centers, live-burn fire
training towers, driver-training tracks, and indoor or Wind Energy System. See §8-17 Wind Energy
outdoor firing ranges Conservation Systems.
Page 37
14 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
Y
Yard, Rear. An open space extending the full width of
the lot between a principal building and the rear lot
line, unoccupied and unobstructed from the ground
upward.
Yard. Any open space which lies between the Yard, Side. An open space extending from the front
principal building or group of buildings and the yard to the rear yard between a principal building
nearest lot line and is unoccupied and unobstructed and the nearest side lot line, unoccupied and
from the ground upward, except as herein permitted. unobstructed from the ground upward.
Yard, Front. An open space which lies between
Z
the principal building or group of buildings and the
street lot line, unoccupied and unobstructed from the
ground upward. In case of a corner lot or a through
lot, the owner may select either street lot line as
the front and shall designate same on any request
Zoning Board of Appeals. The City of Lackawanna,
for a building or use permit; however, the front yard
New York Zoning Board of Appeals.
requirements shall apply to yards fronting on any
street.
Page 38
PART 3 Zoning Districts and Map 15 OF 148
PART 3
ZONING DISTRICTS AND MAP
§3-1 DISTRICTS §3-2 ZONING MAP
ESTABLISHED
The boundaries of the zoning districts are hereby
For the purpose of this chapter, the City of established on a map entitled "City of Lackawanna
Lackawanna is hereby divided into the following Zoning Map" which accompanies and is hereby
districts: declared to be a part of this chapter.
MAP SYMBOL/ §3-3 INTERPRETATION OF
DISTRICT NAME ABBREVIATION BOUNDARIES
BASE DISTRICTS Where uncertainty exists with respect to the
Residential District 1 R-1 boundaries of the various districts as shown on the
Zoning Map, the following rules shall apply:
Residential District 2 R-2
A. Where the designation on the Zoning Map
Residential District 3 R-3 indicates a boundary approximately upon a road,
the center line of the road shall be construed to
Neighborhood Transition NT
be the boundary.
Central Business District CBD B. Where the designation on the Zoning Map
indicates a boundary approximately on a lot
Regional Commercial RC
line, such lot line shall be construed to be the
Enterprise ENT boundary.
Open Space OS C. Distances on the Zoning Map are perpendicular
distances from road center lines where distances
Bethlehem Redevelopment Area BRA are given parallel to the road center line.
OVERLAY DISTRICTS D. In other cases, the district boundary shall be
determined by the use of the scale of the Zoning
Historic Property Overlay HPO Map.
Light Industry LI E. Where a district boundary divides a lot of record
at the time such boundary is adopted, the district
Medium Industry MI requirements of the greater portion of the lot will
Heavy Industry HI become the requirements of the entire lot.
Intermodal INT
Lakefront Open Space LOS
Page 39
This Space Left Intentionally Blank
Page 40
PART 4 Permitted Uses 17 OF 148
PART 4
PERMITTED USES
§4-1 USE SCHEDULE
The following table outlines the permitted uses in each zoning district.
P 1. Uses marked with a “P” are permitted within the district as indicated.
S 2. Uses marked with an “S” require a Special Use Permit pursuant to the requirements in §11-9.
P* S* 3. An asterisk (*) signifies that the use has additional requirements that must be met for the use to
be established. These additional requirements are listed in Part 8 of this Ordinance.
4. Uses that do not have one of the markings listed in this section are expressly prohibited.
R-1 R-2 R-3 CBD NT RC OS ENT BRA
PRINCIPAL USE LI MI HI INT LOS
RESIDENTIAL
1-Family Housing P P P P P — — — — — — — —
2-Family Housing P P P P P — — — — — — — —
3-Family Housing — P P P P — — — — — — — —
Manufactured Home Park — — P* — — — — — — — — — —
Multi-Family Housing — P P P P P — — — — — — —
Group Home — — — S S S — — — — — — —
Residential Care Facility — — — S S S — — — — — — —
Continued on Next Page
Page 41
18 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
Continued from Previous Page
R-1 R-2 R-3 CBD NT RC OS ENT BRA
PRINCIPAL USE LI MI HI INT LOS
COMMERCIAL
Adult Uses — — — — — — — S* — — — — —
Animal Service Facilities — — — P* P* P* — P** — — — — —
Automotive Sales — — — S S P — P — — — — —
Automotive Service Facility — — — S* S* P* — P* — — — — —
Car Wash — — — — — P — P — — — — —
Cannabis Facilities — — — — — — — — — — — — —
Day Care Center — — S P P P — — — — — — —
Lodging — — — P P P — — — — — — —
Medical Office/Health Care Facility (Major) — — — P S P — P — — — — —
Medical Office/Health Care Facility (Minor) — — — S P P — P — — — — —
Personal Services — — — P P P — — — — — — —
Professional Office — — — P P P — P P P — — —
Restaurant/Tavern — — — P P P — — — — — — —
Retail Establishment — — — P P P — — — — — — —
Nursery/Home and Garden Supply — — — S P P — P S — — — —
Page 42
PART 4 Permitted Uses 19 OF 148
R-1 R-2 R-3 CBD NT RC OS ENT BRA
PRINCIPAL USE LI MI HI INT LOS
CIVIC/PUBLIC USES
Recreation Facility, Indoor — — — P P P — P P — — — —
Recreation Facility, Outdoor — — — S P P P P — — — — —
Cemetery P* P* P* —— P** P* P* — — — — — —
Civic/Government Buildings P P P P P P P P — — — — —
Community Scale Agriculture — — P* — — — P* — — — — — —
Cultural Facility — — — P P P P — — — — — —
Farmers Market — — — — — — — — — — — — —
Funeral Services — — — P P P — P — — — — —
Lodge/Private Club — — — P P P — — — — — — —
Neighborhood Garden S* P* P* S* P* — P* — — — — — —
Place of Worship P P P P P P P P — — — — —
Places of Assembly — — — P P P P — — — — — —
Public Park/Open Space P P P P P P P P — — — — P
Public Safety Facility P P P P P P P P — — — — —
School, Public or Private P P P P P P — — — — — — —
School, Vocational or Trade — — — P P P — P P — — — —
Trails P P P P P P P P — — — — P
Continued on Next Page
Page 43
20 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
Continued from Previous Page
R-1 R-2 R-3 CBD NT RC OS ENT BRA
PRINCIPAL USE LI MI HI INT LOS
INDUSTRIAL/ENTERPRISE
Bulk cargo storage and handling facilities — — — — — — — — — — — — —
and loading/unloading equipment, including
cranes, conveyors, and hoppers
Asphalt Plant — — — — — — — — — — — — —
Data Facility/Crypto Currency Mining — — — — — — — — — — — — —
Coal and Coke Handling — — — — — — — — — — S — —
Concrete Production (Batch Plant),
— — — — — — — — — — S — —
Precast Concrete and Aggregate Products
Electrical and Power Production and
— — — — — — — P — — S — —
Power Facilities
Energy and Fuel Production, Including but
— — — — — — — — — — S — —
Not Limited to Biomass; Ethanol; and Biodiesel;
Extraction Industries Related to the
— — — — — — — — — — S — —
Mining of On-Site Materials
Freight Terminal — — — — — — — — — — S — —
Junkyard — — — — — — — — — — — — —
Production or Refining of
— — — — — — — — — — S — —
Petroleum-Related Products
Production of Bio-Mass-Derived Fuels — — — — — — — — — — S — —
Public Utility P P P P P P P P P P P P P
Railway Facilities — — — — — — — P — S P — —
Recycling Facility — — — — — — — P — P — — —
Research & Development Facility — — — — — — — P P — — — —
Page 44
PART 4 Permitted Uses 21 OF 148
R-1 R-2 R-3 CBD NT RC OS ENT BRA
PRINCIPAL USE LI MI HI INT LOS
Self-Storage — — — — — P — P — — — — —
Solar Energy System — — — — — — — — — — — — —
Tier 1 — — — — — — — — — — — — —
Tier 2 — — — — — — — — — — — — —
Tier 3 — — — — — — — S* S* S* S* — —
Tier 4 — — — — — — — — — — S* — —
Solid Waste Management Facility Under
— — — — — — — P — — S — —
Permit or License by the NYSDEC
Storage Yard — — — — — — — P S S — — —
Telecommunications Facility — — — — — P* — P* — — — — —
Warehouse & Distribution Facility — — — — — — — P S S S P —
Waste Transfer Station — — — — — — — P — — — — —
Wind Energy System — — — — — — — — — — S* — —
Laboratory — — — — — — — P P P — — —
Continued on Next Page
Page 45
22 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
Continued from Previous Page
R-1 R-2 R-3 CBD NT RC OS ENT BRA
PRINCIPAL USE LI MI HI INT LOS
Component and Equipment Assembly Including: — — — — — — — P P — — — —
• Electronic Component and Equipment Assembly
• Food and Beverage Products
• Household Items and Furniture
• Office Equipment
• Panels, Sheets, Tubes or Rods
• Pharmaceutical Products, Cosmetics or Toiletries
• Plastic and Rubber Components and Finished
Products
• Printing, Publishing and Engraving, Including
Newspapers
• Recreation Equipment or Toys
Manufacturing, Assembly, and/or Fabrication of: — — — — — — — P — P — — —
• Food and Beverage Products
• Household Items and Furniture
• Office Equipment
• Panels, Sheets, Tubes or Rods
• Pharmaceutical Products, Cosmetics or Toiletries
• Plastics and Plastic Components
• Printing, Publishing and Engraving
• Recreational Equipment or Toys
• Aluminum and Aluminum Products
• Automobile, Marine and Heavy Equipment
• Electrical and Electronic Equipment and
Appliances
• Extruded Products from Plastics, Metals and
Ceramics
• Fabrication of Metal Products
• Household and Industrial Chemical Compounds
• Machinery, Including Parts and Components
• Plastic and Rubber Components and Finished
Products
• Steel Refinishing
• Alternative Energy Components and Assembly
• Other Related Materials
Page 46
PART 4 Permitted Uses 23 OF 148
R-1 R-2 R-3 CBD NT RC OS ENT BRA
PRINCIPAL USE LI MI HI INT LOS
Manufacturing and/or Assembly of the — — — — — — — — — — S — —
Following Products:
• Cement, Lime, Gypsum, Plaster of Paris,
and Abrasives
• Fabrication and Finishing of Steel or
Other Metal Products
• Fertilizer, Glue, Gelatin, Grain Drying and Feed
• Steel
Manufacturing or Production of Gases
— — — — — — — — — — S — —
with Approval from the Fire Department
Lumber Yard — — — — — — — P S — — — —
Enclosed Bulk Cargo Storage and Handling — — — — — — — P — P — — —
Motor Freight Facility & Depot — — — — — — — P — S S P —
Intermodal Facility — — — — — — — — — S — P —
Maritime Terminal — — — — — — — — — — — P —
Training Facility — — — — — — — P P — — — —
Noncommercial Land Treatment and
— — — — — — — — — — P — —
Land Filling of On-Site Remediation Material
Slag Reclamation — — — — — — — — — — P — —
Slaughterhouse — — — — — — — S — — — — —
Page 47
24 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§4-2 USES NOT LISTED
The City of Lackawanna Zoning Enforcement Officer shall determine whether or not an unlisted use is similar to
an existing use or substantially similar to an already defined use. To determine similarity of an unlisted use, the
following shall be considered:
A. Actual or projected characteristics of the proposed H. Types of vehicles used and their parking
use requirements;
B. iThe relative amount of lot area or floor area and I. The number of vehicle trips generated;
equipment devoted to the proposed use:
J. How the proposed use is advertised;
C. Relative amounts of sales;
K. The likely impact on surrounding properties; and
D. The customer type;
L. Whether the activity is likely to be found
E. The relative number of employees; independent of the other activities on the lot.
F. Hours of operation;
G. Building and site arrangement;
Page 48
PART 5 District Regulations 25 OF 148
PART 5
DISTRICT REGULATIONS
§5-1 RESIDENTIAL DISTRICT 1 (R-1)
A. Purpose. The intent of the R-1 District is to permit D. Accessory Uses and Structures
the construction and/or reconstruction of homes
in a manner that generally consists of owner- ACCESSORY USE/STRUCTURE STANDARDS
occupied, detached homes on varied lot sizes, Detached Garage
with unobstructed front yards, sidewalks, street
trees, and other amenities. Shed
B. Principal and Special Uses. Permitted uses Off Street Parking §7-2
within the R-1 District are listed within the
Accessory Dwelling Unit §8-3
schedule of uses in §4-1. There shall not be more
than one principal residential structure permitted Home Occupation §8-10
on a lot in the R-1 District, however, the principal
structure may contain up to 2 dwelling units. Neighborhood Garden §8-13
Private Recreational Structures and Uses
C. Dimensional Standards
Fences §7-4-6
ACCESSORY USE/STRUCTURE STANDARDS
Private Schools and Day Cares, Accredited when Required by
Minimum Lot Size 6000 sq. ft. NYS, when Accessory to a Place of Worship
Minimum Lot Frontage 60 ft. Swimming Pools
Maximum Building Height 2.5 Stories or 25 ft. Signs §7-9
Minimum Front Yard Setback 25 ft. Solar energy system §8-15
Rear Yard Setback 25 ft. Other Uses and Structures that are
Customarily Incidental to the Principal Use
Side Yard Setback 8 ft. Each Side
Maximum Lot Coverage (Including 40%
E. Accessory Use Dimensional Standards
Accessory Structures)
ACCESSORY USE/STRUCTURE STANDARDS
Minimum Building Separation 5 ft.
Minimum from Lot Line 5 ft.
Maximum Height 20 ft. or Height of the
Principal Structure
F. General Development Standards. Development
in the R-1 District shall comply with the general
development standards listed in Part 7 of this Chapter
as applicable.
Page 49
26 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§5-2 RESIDENTIAL DISTRICT 2 (R-2)
A. Purpose. The intent of the R-2 District is to D. Accessory Uses and Structures
promote the development of a diversity of
housing types including attached and detached ACCESSORY USE/STRUCTURE STANDARDS
residential structures. This district intends to Detached Garage
provide flexibility in style, and placement while
protecting the value and character of existing Shed
neighborhoods. Off Street Parking §7-2
B. Principal and Special Uses. Permitted uses
Accessory Dwelling Unit §8-3
within the R-2 District are listed within the
schedule of uses in §4-1. Home Occupation §8-10
C. Dimensional Standards Neighborhood Garden §8-13
Fences §7-4-6
ACCESSORY USE/STRUCTURE STANDARDS
Minimum Lot Size 3,000 sq. ft. Swimming Pools
Minimum Lot Frontage 30 ft. Solar Energy System §8-15
Maximum Building Height 2.5 Stories or 25 ft. Private Schools and Day Cares, Accredited When Required by
NYS, When Accessory to a Place Of Worship
Front Yard Setback 10 ft.
Swimming Pools
Rear Yard Setback 20 ft.
Signs §7-9
Side Yard Setback 5 ft./10 ft. Combined
Other Uses and Structures that are
Maximum Lot Coverage (Including 40% Customarily Incidental to the Principal Use
Accessory Structures)
E. Accessory Use Dimensional Standards
ACCESSORY USE/STRUCTURE STANDARDS
Minimum Building Separation 5 ft.
Minimum From Lot Line 5 ft.
Maximum Height 20 ft. or Height of the
Principal Structure
Page 50
PART 5 District Regulations 27 OF 148
§5-3 RESIDENTIAL DISTRICT 3 (R-3)
A. Purpose. The intent of the R-3 District is to D. Accessory Uses and Structures
provide opportunity for the development of
medium density housing where the style, ACCESSORY USE/STRUCTURE STANDARDS
orientation, and character blend into the existing Detached Garage
fabric of the neighborhood.
Shed
B. Principal and Special Uses. Permitted uses
within the R-3 District are listed within the Off Street Parking §7-2
schedule of uses in §4-1.
Accessory Dwelling Unit §8-3
C. Dimensional Standards Home Occupation §8-10
ACCESSORY USE/STRUCTURE STANDARDS Neighborhood Garden §8-13
Minimum Lot Size 7,500 Fences §7-4-6
Minimum Lot Frontage 75 ft . Swimming Pools
Maximum Building Height 4 Stories or 45 ft. Solar Energy System §8-15
Minimum Front Yard Setback 20 ft. Other Uses and Structures that are
Customarily Incidental to the Principal Use
Rear Yard Setback 20 ft.
Side Yard Setback 10 ft .
E. Accessory Use Dimensional Standards
Maximum Lot Coverage (Including N/A
Accessory Structures) ACCESSORY USE/STRUCTURE STANDARDS
Minimum Building Separation 5 ft.
Minimum From Lot Line 5 ft.
Maximum Height 20 ft. or Height of the
Principal Structure
Page 51
28 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§5-4 CENTRAL BUSINESS DISTRICT (CBD)
A. Purpose. The Central Business District intends to D. Accessory Uses and Structures
foster the development of the City's commercial,
civic and tourism center. The CBD encourages ACCESSORY USE/STRUCTURE STANDARDS
residential, commercial and public uses acting Shed
together to create a vibrant, mixed-use activity
center. The scale and design of buildings Off Street Parking, Loading, and §7-2
should seek to preserve and enhance the urban Stacking Facilities
character of the corridor. Fences §7-4-6
B. Principal and Special Uses. Permitted uses
Signs §7-9
within the Central Business District are listed
within the schedule of uses in §4-1. Solar Energy System §8-15
C. Dimensional Standards Other Uses and Structures that are
Customarily Incidental to the Principal Use
ACCESSORY USE/STRUCTURE STANDARDS
Minimum Lot Size 4,000 sq. ft. E. Accessory Use Dimensional Standards
Minimum Lot Frontage N/A ACCESSORY USE/STRUCTURE STANDARDS
Maximum Building Height 4 Stories or 40 ft. Minimum Building Separation 5 ft.
Maximum Front Yard Setback 10 ft. Minimum From Lot Line 5 ft.
Rear Yard Setback 10 ft. Maximum Height 20 ft. or Height of the
Principal Structure
Side Yard Setback 0 ft.
Maximum Lot Coverage (Including 80%
Accessory Structures)
Minimum Floor Area (Ground Story) 1,000 sq. ft.
Page 52
PART 5 District Regulations 29 OF 148
§5-5 NEIGHBORHOOD TRANSITION DISTRICT (NT)
A. Purpose. The purpose of the Neighborhood D. Accessory Uses and Structures
Transition District is to encourage the
development of pedestrian scale commercial ACCESSORY USE/STRUCTURE STANDARDS
and residential uses that serve the day-to-day Detached Garage
needs of local residents, to support neighborhood
activities and insure the compatibility of Shed
development with the surrounding sensitive Off Street Parking §7-2
residential uses.
Accessory Dwelling Unit §8-3
B. Principal and Special Uses. Permitted uses
within the Neighborhood Transition District are Home Occupation §8-10
listed within the schedule of uses in §4-1.
Neighborhood Garden §8-13
C. Dimensional Standards Private recreational structures and uses
ACCESSORY USE/STRUCTURE STANDARDS Fences §7-4-6
Minimum Lot Size 2,500 sq. ft. Private Schools and Day Cares, Accredited when Required by
NYS, when Accessory to a Place of Worship
Minimum Lot Frontage 30 ft
Swimming Pools
Maximum Building Height 3 Stories or 35 ft.
Signs §7-9
Maximum Front Yard Setback 10 ft.
Solar Energy System §8-15
Rear Yard Setback 10 ft.
Other Uses and Structures that are
Side Yard Setback 3 ft. Customarily Incidental to the Principal Use
Maximum Lot Coverage (Including 80%
Accessory Structures)
Minimum Floor Area (Ground Story) 1,000 sq. ft.
Page 53
30 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§5-6 REGIONAL COMMERCIAL (RC)
A. Purpose. The Regional Commercial District D. Accessory Uses and Structures
focuses on the encouragement of commercial
uses, while protecting surrounding uses from ACCESSORY USE/STRUCTURE STANDARDS
increased traffic, lighting, noise and other Off Street Parking §7-2
encroachments.
Fences §7-4-6
B. Principal and Special Uses. Permitted uses
within the Regional Commercial District are listed Signs §7-9
within the schedule of uses in §4-1.
Solar Energy System §8-15
C. Dimensional Standards Other Uses and Structures that are
Customarily Incidental to the Principal Use
ACCESSORY USE/STRUCTURE STANDARDS
Minimum Lot Size 5,000 sq. ft.
Minimum Lot Frontage 50 ft.
Maximum Building Height 3 Stories or 35 ft.
Maximum Front Yard Setback 20 ft.
Rear Yard Setback
• Adjacent to a Residential Use 20 ft.
• Adjacent to a Non-Residential Use 5 ft.
Side Yard Setback
• Adjacent to a Residential Use 20 ft.
• Adjacent to a Non-Residential Use 5 ft.
Maximum Lot Coverage (Including 80%
Accessory Structures)
Page 54
PART 5 District Regulations 31 OF 148
§5-7 ENTERPRISE DISTRICT (ENT)
A. Purpose. The Enterprise District within the D. Accessory Uses and Structures
City of Lackawanna provides a balanced
employment mix and diversified tax base for the ACCESSORY USE/STRUCTURE STANDARDS
city. The district is designed to accommodate Off Street Parking §7-2
light industrial, assembly, and office uses
while providing the opportunity for large scale Fences §7-4-6
warehousing and distribution. Signs §7-9
B. Principal and Special Uses. Permitted uses
Solar Energy System §8-15
within the Regional Commercial District are listed
within the schedule of uses in §4-1. Other uses and Structures that are
Customarily Incidental to the Principal Use
C. Dimensional Standards
ACCESSORY USE/STRUCTURE STANDARDS
Minimum Lot Size 20,000 sq. ft.
Minimum Lot Frontage 75 ft.
Maximum Building Height 3 Stories or 35 ft.
Maximum Front Yard Setback 20 ft.
Rear Yard Setback
• Adjacent to a Residential Use 20 ft.
• Adjacent to a Non-Residential Use 5 ft.
Side Yard Setback
• Adjacent to a Residential Use 20 ft.
• Adjacent to a Non-Residential Use 5 ft.
Maximum Lot Coverage (Including 80%
Accessory Structures)
Page 55
32 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§5-8 OPEN SPACE DISTRICT (OS)
A. Purpose. The Open Space District has been D. Accessory Uses and Structures
designated in the City of Lackawanna to preserve
and protect natural and open space resources ACCESSORY USE/STRUCTURE STANDARDS
in the City of Lackawanna while allowing for the Accessory storage buildings
placement of essential public services, utilization
of property for recreation and open space uses. Solar Energy Systems §8-15
B. Principal and Special Uses. The permitted Fences §7-4-6
principal uses within this district are listed in the
Off-Street Parking and Loading Facilities §7-2
use schedule in §4-1.
Picnic and Transit Shelters
C. Dimensional Standards
Signs §7-9
ACCESSORY USE/STRUCTURE STANDARDS Other Uses and Structures that are
Customarily Incidental to the Principal Use
Minimum Lot Size N/A
Minimum Lot Frontage N/A
Floor Area—Maximum 5,000 sq. ft.
Maximum Building Height 2.5 stories or 25 ft.
Minimum Front Yard As Determined Through
Site Plan Review
Minimum Side Yard As Determined Through
Site Plan Review
Minimum Rear Yard As Determined Through
Site Plan Review
Maximum Building Coverage As Determined Through
Site Plan Review
Maximum Lot Coverage As Determined Through
Site Plan Review
Page 56
PART 5 District Regulations 33 OF 148
§5-9 BETHLEHEM REDEVELOPMENT AREA (BRA)
A. Purpose. The purpose of the Bethlehem E. Prohibited Uses. Per deed restrictions placed on
Redevelopment Area is to redevelop the former the former Bethlehem Steel Corporation property,
industrial site into a driver of economic activity for the following land uses are prohibited in the BRA:
Lackawanna and Western New York.
1. Residential (All Densities);
B. Principal and Special Uses. The Permitted
2. Schools;
principal uses within this overlay district are listed
in the use schedule in §4-1. 3. Day-care Facilities and Nursery Schools, or
Other Facilities Primarily used for Multiple
C. Dimensional Standards. The dimensional
Numbers of Persons Under the Age of 18
standards of the Bethlehem Redevelopment Area
Years; and,
are vested within the Light Industrial, Medium
Industrial, Heavy Industrial, Intermodal, and 4. Wells for Extraction of Water, Other than for
Lakefront Open Space Overlay Districts. Monitoring, Treating or Remediation.
F. Site Plan Review. All changes in land use or
D. Accessory Uses and Structures expansion of existing land uses are subject to
site plan review in accordance with §11-5 of this
ACCESSORY USE/STRUCTURE STANDARDS chapter.
Accessory Storage Buildings G. Design Standards.
Fences §7-4-6 1. Intent. These supplemental regulations are
intended to establish design standards for all
Off-Street Parking and Loading development occurring in the portions of the
§7-2
Facilities Bethlehem Redevelopment Area immediately
adjacent to New York State Route 5 and/
Transit Shelters
or the Hamburg Turnpike (which are both
Signs §7-9 segments of the Great Lakes Seaway Trail
and National Scenic Byway). Properties
Solar Energy System §8-15 visible from these roadways are part of the
gateway into the City of Lackawanna and
Other uses and Structures that are
Customarily Incidental to the Principal Use should be held to a higher design standard
to maintain a quality image of this part of the
City. It is the intent of this section to guide
site development as it relates to building
and parking orientation, general building
design, landscaping, site lighting, signage
and outdoor storage for all development that
occurs in this area of the BRA.
2. Applicability. The following supplemental
regulations and design guidelines shall apply
to development sites located within the BRA
that have property boundaries adjoining
New York State Route 5 and/or the Hamburg
Turnpike rights-of-way. These regulations
apply to all areas zoned BRA-LI, and some
property zoned BRA-MI.
Continued on Next Page
Page 57
34 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
Continued from Previous Page
3. Building and Lot Orientation. Unless A. Parking and Pedestrian Circulation.
otherwise specified, the following provisions
i. Minimum off-street parking
are supplemental to the applicable
requirements for site development
regulations outlined in Part 5 of this Chapter.
shall be as established pursuant to
a. All lots shall have primary frontage along §7-2.
the internal public roadway, with access
ii. All parking areas shall be paved and
to buildings and their associated parking
striped with the surfaces in good
lots provided from the internal roadway.
condition and designed for proper
b. For lots situated along New York State drainage.
Route 5 or the Hamburg Turnpike,
iii. No parking shall be permitted within
the portion of the building facing
eight feet of any portion of a building
these roadways shall be considered a
other than for loading area and
secondary frontage. No driveway access
access to the loading dock.
will be allowed onto New York State
Route 5 or the Hamburg Turnpike with the iv. The eight-foot area between parking
issuance of a Special Use Permit pursuant lots and buildings shall be used
to §11-9. for sidewalks, foundation plantings
and other site amenities, such as
c. The rear facades and side walls of
benches, bike racks and lighting.
buildings that face the Hamburg Turnpike
shall be designed in a manner that is in v. Shared parking and shared access
keeping with an aesthetic image for this between parking lots is encouraged
gateway area. Properties shall abide by all in order to reduce the total area
design standards. dedicated to parking.
d. Primary building entrances shall be vi. Where parking areas abut parking
oriented towards the internal roadway areas on adjacent lots, a minimum
with secondary entrances on the side or five-foot vegetative buffer strip shall
rear facing the parking area. be installed to break up the monotony
of the paved areas.
e. The subdivision of any BRA lots situated
along New York State Route 5 shall result vii. Clearly marked pedestrian pathways
in sublots that are symmetrical in layout shall be provided within the interior of
(square or rectangle); the creation of parking lots to avoid large expanses
oddly shaped lots is discouraged. of asphalt and to enhance pedestrian
safety.
f. Loading docks shall have access to the
internal public roadway and shall be viii. As per §7-4, shade trees shall be
properly screened from view. provided in parking lots to ensure
that within 15 years after the
4. Parking and Circulation. Unless otherwise establishment of the lot at least
specified, the following provisions are 40% of the lot, calculated by using
supplemental to the applicable existing the diameter of the tree crown at 15
regulations of §7-2: years, will be shaded. This can be
accomplished with center islands
and plantings along the parking lot
edges.
Page 58
PART 5 District Regulations 35 OF 148
ix. Areas that will be utilized by trucks (3) No building facade that
shall be built to a standard that can faces a street shall have a
effectively support the anticipated blank, uninterrupted wall
weight. of more than 20 linear
feet (40 feet for buildings
B. Sidewalks.
greater than 120 feet
i. Sidewalks measuring six feet in width in length). This can be
shall be provided along the internal achieved through the use of
public roadway in the BRA-LI District. a combination of divisions
ii. Interior sidewalks or striped or breaks in the materials,
crosswalks shall be provided to separate entrances and
ensure safe pedestrian travel entry treatments, windows,
between building and the sidewalk vegetation or other visual
along the internal public roadway. design elements, colors and
textures.
iii. Sidewalks shall be provided to
connect parking areas located to the (4) In multistory buildings,
sides and rear of buildings with the the ground floor shall be
front entrance. distinguished from the floors
above. This can be achieved
iv. Pedestrian amenities such as
through a combination of
benches and trash receptacles shall
an intermediate cornice
be provided where appropriate.
line, a difference in building
5. Building Character and Materials. materials or detailing, an
awning, trellis or arcade,
(A) Building Scale and Design.
special window lintels or
(1) Diversity in architectural brick corbels or quoins.
style is encouraged;
(5) Architectural elements and
however, multiple buildings
features should be designed
on the same site shall be
at a scale to be visible from
designed to present a
the street.
coordinated or compatible
visual relationship. (6) Buildings that front more
than one street shall have
(2) Exterior building design
a front facade facing each
features shall be
street.
encouraged to provide
individual character to (7) Rooftop screening shall be
buildings. Such features may incorporated in the design of
include decorative cornices, buildings to shield vents and
pilasters, columns, relief, rooftop-mounted equipment
medallions, dormers and from view of the street.
eave breaks. (8) Equipment that emits noise
shall be appropriately
screened to prevent sound
from traveling beyond the
property line.
Continued on Next Page
Page 59
36 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
Continued from Previous Page
(B) Accessory Structures (2) Foundation landscaping
(1) Mobile office trailers, truck shall consist of trees, shrubs,
trailers, shipping containers and flower beds.
or other storage trailers (3) Trees shall be planted along
shall not be permitted for the street frontage every 30
permanent use as office feet on center.
or production space, or for (4) Trees shall be provided in
storage purposes. setback areas to ensure
(C) Building Materials that within 15 years of
establishment at least 60%
(1) No fewer than two exterior
of the setback, calculated
materials shall be utilized for
as the diameter of the tree
building facades.
crown, will be shaded.
(2) Building materials shall be
(5) Landscaped islands, planted
comprised of materials of
with trees and shrubs, shall
high quality and durability.
be provided within parking
Walls shall be clad in a mix
areas for more than 30
of stone, brick, marble, metal
vehicles to break up the
paneling, cast concrete, vinyl
monotony of pavement
siding, Dryvit® and Hardie
and provide shaded areas.
board, cement paneling or
One island shall be placed
similar material.
between every 15 parking
(3) All walls visible from a public spaces.
right-of-way shall be clad
(4) Landscaping shall be
with the same material
protected from impacts of
required for the front facade
snow clearance and storage.
of the building.
vii. All on-site landscaping
(4) Roofing systems shall be
shall comply with additional
comprised of materials
standards found in § 230-34.
appropriate to the
architectural style and color viii. All landscape features
palette of the building. identified for site
development as part of an
(5) Deteriorated or damaged
approved site plan shall be
exterior building materials
properly maintained and,
shall be repaired or replaced
as necessary, replaced to
using appropriate materials.
ensure compliance with this
(D) Landscaping approval.
(1) The entrance points to any 6. Screening and Outdoor Storage
site shall be well designed
and landscaped as a unique (A) Screening. Unless otherwise
element of each business. specified, the following
provisions are supplemental
to the applicable regulations
outlined in §7-7:
Page 60
PART 5 District Regulations 37 OF 148
(1) Parking areas situated (B) Mechanical and Utility
between buildings and Equipment
the New York State Route (1) Ground-mounted
5 corridor shall utilize a mechanical and utility
combination of berms, equipment shall be properly
shrubs and trees to screened from view with
effectively screen these vegetative plantings or other
areas from view. measures to not be visible
(2) Loading docks shall be from New York State Route
effectively screened from 5 and the interior public
view from both Route roadway.
5 and primary interior (2) Roof-mounted mechanical
roadways through the equipment shall be screened
use of fencing, partitions with parapet walls or other
constructed of brick or appropriate measures to not
other acceptable materials, be visible from New York
berming, vegetation or any State Route 5 or the interior
combination thereof. public roadway.
(3) Dumpsters shall be properly
(C) Outdoor Storage. Outdoor
screened from view with
storage or display of bulk
fencing or a masonry
materials, equipment, component
enclosure that exceeds
products or finished products
the height of the trash
shall not be allowed in the
receptacles contained
BRA-LI District or portions of the
therein.
BRA-MI District located along
(4) Dumpster enclosures shall Route 5.
be gated and gates shall be
vii. Utilities. All on-site utilities shall
kept closed when not in use.
be designed and constructed in
(5) Trash compactors and compliance with the provisions of
recycling bins shall be §7-13.
properly screened with
viii. Lighting and Signage.
dense vegetation, wood
fencing or masonry
enclosures that match the
design of the building.
Continued on Next Page
Page 61
38 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
Continued from Previous Page
(A) Lighting (G) Signage. Unless otherwise
(1) All site lighting, both specified, the following
freestanding and fixtures guidelines are supplemental
attached to structures, shall to the applicable existing
be properly screened to regulations §7-9:
prevent glare, uplighting and (1) The size and color of
spill off the property. signs shall complement
(2) Night lighting must be the facade, scale and
provided for all pedestrian architectural style of the
facilities. building.
(3) Bollard lighting can be (2) Street numbers shall be
used as accent lighting prominently displayed at
along pedestrian paths the main entrance to every
and to highlight pedestrian business and be clearly
crossings in parking lots and visible from the street.
across streets. (3) Exterior signs shall
(4) Lighting within industrial be limited to business
sites for security and identification and
nighttime operation shall description; signs
be limited and properly advertising products shall be
screened. prohibited.
(5) Lighting on buildings to (4) External signage that is
highlight architectural detail illuminated shall be properly
is permissible. controlled to prohibit
excessive light that spills
(6) Lighting shall comply with outward or upward.
additional standards found
in §7-5. (5) Rooftop signs and billboards
on buildings shall be
prohibited.
(6) Directional signage may be
provided at key locations
within a site that has more
than one primary structure
for wayfinding purposes.
(7) No off-premises signs are
permitted.
Page 62
PART 5 District Regulations 39 OF 148
§5-10 LIGHT INDUSTRY OVERLAY (LI)
A. Purpose. The primary purpose of the Light D. Accessory Uses and Structures. The following
Industry Overlay District is to encourage are permitted in the Light Industry Overlay
the development of a mix of uses, such as District:
offices, research and development facilities,
1. Communication towers/dishes required for
wholesale, warehousing/distribution, and light
operation of primary use;
manufacturing uses, with the intent of offering
a wide range of job opportunities with a focus 2. Employee services, such as cafeterias, credit
on contributing to the City’s tax base. Properties unions and recreational facilities, which are
in the BRA-LI are visible from New York State located within the primary structure and
Route 5 and/or the Hamburg Turnpike and help occupy no more than 10% of the developed
establish the image of the area. Development in floor area;
this district is subject to higher design standards 3. Satellite television receiving antenna;
in order to present an attractive setting.
4. Truck shipping and delivery facilities
B. Principal and Special Uses. The Permitted accessory to primary operation;
principal uses within this overlay district are listed
5. Warehouse and distribution facilities ancillary
in the use schedule in §4-1.
to the primary use and limited to a floor area
not to exceed 35% of the gross floor area of
C. Dimensional Standards the primary use; and,
ACCESSORY USE/STRUCTURE STANDARDS 6. Rooftop solar energy system apparatus, if
not visible from a public right-of-way, and
Minimum Lot Size 5 Acres; or 50 Acres for PUD if attached to a primary structure, and if
Minimum Lot Frontage 300 ft. not creating an exceedance of area height
restrictions measured from top of apparatus
Maximum Building Height 45 feet or 3 Stories to ground [Amended 3-29-2021].
Minimum Front Yard 30 ft./50-foot Setback Required E. Accessory Use and Structure Dimensional
from New York State Route Standards. Accessory use and structures shall
5 Right-of-Way/Hamburg meet the minimum dimensional requirements
Turnpike Right-of-Way of the principal uses and structures of the Light
Industrial Overlay District.
Minimum Side Yard 25 ft.
Minimum Rear Yard N/A
Minimum Buffer to Smokes
50 ft.
Creek Mean Water Line
Minimum Building Coverage 15%
Maximum Lot Coverage 75%
Minimum Landscaping
25%
Coverage
Minimum Setback for Parking
10 ft.
from Right-of-Way
Page 63
40 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§5-11 MEDIUM INDUSTRY OVERLAY (MI)
A. Purpose. The Medium Industry (MI) Overlay D. Accessory Uses and Structures. The following
has been created to establish a transitional zone are permitted in the Medium Industry Overlay
between the Light Industry Overlay (LI) District District:
along New York State Route 5 and the Heavy
1. Communication towers/dishes required for
Industry Overlay District (HI) to the interior of
operation of primary use;
the site. This transitional zone is intended to
encourage "non-smokestack" manufacturing 2. Employee services such as cafeterias, credit
and high employment uses to promote unions and recreational facilities, which are
redevelopment, while remaining compatible with located within the primary structure and
both the HI and LI Districts. occupy no more than 10% of the developed
floor area;
B. Principal and Special Uses. The Permitted
principal uses within this overlay district are listed 3. Outdoor storage of finished goods produced
in the use schedule in §4-1. on-site (limited to 50% of site) and screened
from all internal roads and bike paths and
C. Dimensional Standards public recreational amenities, Route 5,
and all external roads to the Bethlehem
ACCESSORY USE/STRUCTURE STANDARDS Redevelopment Area; [Amended 3-29-2021]
Minimum Lot Size 8 Acres, or 4. Rail sidings and service;
50 Acres for PUD 5. Satellite television receiving antenna, if
attached to the primary structure;
Minimum Lot Frontage 500 ft.
6. Truck shipping and delivery accessory to
Maximum Building Height 60 ft. primary operation;
Minimum Front Yard 50 ft. 7. Warehouse and distribution facilities ancillary
to the primary use and limited to a floor area
Minimum Side Yard 50 ft.
not to exceed 35% of the gross floor area of
Minimum Rear Yard 50 ft. the primary use.
E. Accessory Use and Structure Dimensional
Minimum Buffer to Smokes Creek 50 ft.
Standards. Accessory use and structures shall
Mean Water Line
meet the minimum dimensional requirements of
Minimum Building Coverage 18% the principal uses and structures of the Medium
Industrial Overlay District.
Maximum Lot Coverage (Including Parking) 80%
Minimum Landscaping Coverage 20%
Page 64
PART 5 District Regulations 41 OF 148
§5-12 HEAVY INDUSTRY OVERLAY (HI)
A. Purpose. he Heavy Industry (HI) Overlay B. Principal and Special Uses. The Permitted
District has been designated to accommodate principal uses within this overlay district are listed
the redevelopment of the site for wind power, in the use schedule in §4-1.
heavy industry and general manufacturing
and production uses. The HI District allows D. Accessory Uses and Structures. The following
for a continuation of uses that have shaped are permitted in the Heavy Industry Overlay
Lackawanna's industrial past. The intent is to District:
utilize the site's size, history, environmental
limitations and existing infrastructure to take 1. Rooftop energy system apparatus for on-site
advantage of one of the region's best-suited sites operations, if attached to a primary structure;
for developing new heavy industry. This district [Amended 3-29-2021];
is intended to co-locate compatible industries 2. Employee services such as cafeterias, credit
on large lots in an organized manner to ensure unions and recreational facilities, which are
the efficient development of the interior of the located within the primary structure and
site. The district is established to encourage the occupy no more than 10% of the developed
development of a broad range of employment floor area;
opportunities within the City and to enhance the 3. Outdoor storage of equipment and bulk
City's tax base. materials, provided all such material must
be fully screened from an elevation from
C. Dimensional Standards all on-site bike paths, internal and external
roads to the Bethlehem Redevelopment
ACCESSORY USE/STRUCTURE STANDARDS Area, and all on-site recreational amenities,
Minimum Lot Size 20 Acres Individual Site or 50 including Smokes Creek; [Amended
Acres for PUD Development 3-29-2021];
4. Rail sidings and service; and,
Minimum Lot Frontage 500 ft.
5. Satellite television receiving antenna, if
Maximum Building Height 100 ft. attached to the primary structure.
Minimum Front Yard 50 ft. E. Accessory Use and Structure Dimensional
(Landscaped) Standards. Accessory use and structures shall
meet the minimum dimensional requirements of
Minimum Side Yard 50 ft.
the principal uses and structures of the Heavy
Minimum Rear Yard 50 ft. Industrial Overlay District.
Minimum Buffer To Smokes Creek 50 ft.
Mean Water Line
Minimum Building 75 ft.
Setback to the Canal
Minimum Building Coverage 10%
Maximum Lot Coverage 85%
Minimum Open Space 15%
Page 65
42 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§5-13 INTERMODAL OVERLAY (INT)
A. Purpose. The intent of the Intermodal (INT) D. Accessory Uses and Structures. The following
Overlay District is to encourage continued use are permitted in the Heavy Industry Overlay
and expansion of the BRA's existing shipping District:
and rail infrastructure. The area within this
1. Motor freight facilities for loading and
district uniquely benefits from the location of
unloading.
the Gateway Trade Center, the Lackawanna
Ship Canal and an extensive network of rail 2. Rail service lines and extensions.
lines and open areas to move, temporarily store 3. Offices related to operations.
and transfer goods between ship, rail and truck
E. Accessory Use and Structure Dimensional
transport. Activities permitted in this district shall
Standards. Accessory use and structures shall
facilitate the continuation of traditional water-
meet the minimum dimensional requirements of
related industrial uses and promote water-based
the principal uses and structures of the Heavy
and rail-based materials handling facilities on
Industrial Overlay District.
both sides of the Lackawanna Ship Canal.
F. Outdoor Storage and Screening
B. Principal and Special Uses. The Permitted
Requirements.
principal uses within this overlay district are listed
in the use schedule in §4-1. 1. Screening or enclosures shall be of sufficient
height and density to obstruct the view
C. Dimensional Standards of the component or finished products
stored on-site from New York State Route
ACCESSORY USE/STRUCTURE STANDARDS 5, Bethlehem Redevelopment Area interior
Minimum Setback to Canal (for Structures) N/A public roadways, all public bike paths, and
all recreational amenities, including Smokes
Minimum Lot Frontage N/A Creek and all exterior roads. [Amended
3-29-2021].
Maximum Building Height 100 ft.
2. Bulk materials stored outdoors must be
Minimum Front Yard 50 ft. contained or controlled in such a manner as
to not allow fugitive dust or blowing of bulk
Minimum Side Yard (Buildings and 50 ft.
Outdoor Storage of Bulk Materials) materials or odors migrating off premises and
negatively affecting neighboring properties.
Minimum Rear Yard (Buildings and 50 ft.
Outdoor Storage of Bulk Materials)
Minimum Building Coverage N/A
Maximum Lot Coverage N/A
Minimum Landscaping Coverage N/A
Page 66
PART 5 District Regulations 43 OF 148
§5-14 LAKEFRONT OPEN SPACE OVERLAY (LOS)
A. Purpose. The intent of the Lakefront Open Space B. Principal and Special Uses. The Permitted
Overlay (LOS) is to provide for habitat restoration principal uses within this overlay district are listed
and limited opportunities for passive public open in the use schedule in §4-1.
space within the constraints of the site. This area C. Setback Requirement. A 100-foot setback from
shall include the establishment of a 100-foot the top of the bluff shall be established. No uses
vegetative buffer along the top of the bluff. Site or structures may be placed within the setback
conditions preclude public access along most area.
of the shoreline, but scenic overlooks may be
feasible near Smokes Creek
Page 67
44 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§5-15 HISTORIC PROPERTY OVERLAY (HPO)
A. Purpose. The Historic Property Overlay D. Dimensional Standards. The dimensional
(HPO) District is meant to provide additional requirements of the base zoning district shall be
protections to buildings, properties, and met for all properties within the Historic Property
features that are deemed architecturally and/or Overlay District.
culturally significant to the City of Lackawanna. E. Accessory Use and Structure Dimensional
Development that occurs within the Historic Standards. All accessory uses permitted within
Property Overlay District must be consistent with the underlying zoning district are permitted
the style of existing buildings and features on within the Historic Property Overlay District.
site and other buildings and features within the Additionally, the following uses are permitted as
district. This district is intended to: subordinate to a permitted principal use:
1. Promote the protection and enhancement 1. Public Parking.
of the historic buildings, sites and districts
2. Uses that are customarily incidental to the
which represent distinctive elements of
principal use.
Lackawanna’s historic, architectural and
cultural heritage as well as archaeological F. Design Standards.
sites;
1. Exterior wall surfaces of principal buildings
2. Foster civic pride in the accomplishments of shall be of masonry, brick, metal or a
the past; and combination thereof. Exterior building walls
3. Protect and enhance Lackawanna’s shall not include Exterior Insulation Finish
attractiveness to visitors and the support and Systems (EFIS), vinyl siding, glass block, or
stimulus to the economy thereby provided. vertical aluminum or metal siding.
B. The Historic Preservation Overlay District 2. Side or rear walls of principal buildings facing
regulations and procedures are intended to be a street right shall be comprised of the same
imposed in addition to those of the underlying exterior finish materials as the building front.
zoning district. F. Design Standards.
C. Principal and Special Uses. The Permitted 1. Exterior wall surfaces of principal buildings
principal uses within this overlay district follow shall be of masonry, brick, metal or a
the principal uses allowed in the base districts combination thereof. Exterior building walls
listed in the use schedule in §4-1, with the shall not include Exterior Insulation Finish
exception of: Systems (EFIS), vinyl siding, glass block, or
1. Pedestrian-oriented commercial uses, vertical aluminum or metal siding.
including retail and/or personal service 2. Side or rear walls of principal buildings facing
establishments, restaurants, hotels, private a street right shall be comprised of the same
clubs. exterior finish materials as the building front.
Page 68
PART 6 Planned Unit Developments 45 OF 148
PART 6
PLANNED UNIT DEVELOPMENTS (PUD)
§6-1 PURPOSE §6-4 MINIMUM AREA
Planned Unit Developments (PUDs) permit the Planned Unit Developments shall be comprised of
establishment of areas where diverse uses may be at least 50 acres. Public roads shall be permitted to
brought together in a unified plan of development. divide such acreage, provided that at least one acre of
This flexibility will lead to more creative design of contiguous land area exists in each portion.
development than what is currently allowed in the
conventional zoning districts. §6-5 OPEN SPACE
§6-2 USES A minimum of 25% of the site shall be used as open
space, with a minimum of 10% of the entire acreage
A. In PUDs, land and buildings may be used devoted to free public recreation space. Open space
for any lawful purposes, as determined by may include walkways, plazas, landscaped areas and
the City Council, based upon a review and recreation areas. Parking areas and vehicle access
recommendations by the Planning and facilities shall not be considered in calculating open
Development Board and subject to the limitations space.
and procedures of this chapter.
B. No uses, buildings, or structures which deviate §6-6 COMMON PROPERTY
from the approved PUD scheme, or the City
The landowner shall provide for and establish
of Lackawanna Comprehensive Plan shall be
a perpetual organization for the ownership and
allowed.
maintenance of any common property in the PUD.
§6-3 LOCATION Such organization shall not dispose of any common
property by sale or otherwise except to dedicate such
A. The PUD District shall be permitted in any area property to the City of Lackawanna for public use.
of the City of Lackawanna where the applicant The City may refuse the dedication of land if deemed
demonstrates that the characteristics of the appropriate.
development will satisfy the intent and objectives
of the City of Lackawanna Comprehensive Plan
and the provisions of this chapter.
B. Where a PUD is deemed appropriate, the
rezoning of land to a PUD District in accordance
with Part 11 of this chapter will replace all uses
and dimensional specifications contained
elsewhere in this chapter.
Page 69
This Space Left Intentionally Blank
Page 70
PART 7 General Development Standards 47 OF 148
PART 7
GENERAL DEVELOPMENT STANDARDS
§7-1 MEASUREMENTS AND EXCEPTIONS
§7-1-1 Building Height §7-1-3 Driveways
A. Building height refers to the vertical distance A. The parking of vehicles shall be prohibited in any
from the finished grade line to: required front yard except on a paved surface.
1. The highest point of the coping of a flat roof; B. Driveways may be located within the required
front yard and are not subject to the required
2. The ridge line of a gable, shed, hip, or
setbacks of the district in which they are located.
gambrel roof; and,
C. For parcels containing one to four residential
3. The highest point of the roof and any
dwelling units, the area of the driveway, measured
parapets of a mansard roof.
from the front lot line to the setback line of the
B. Mechanical equipment may exceed the maximum principal structure, shall not exceed 35% of the
height of the roof given that the equipment is full area between the front lot line and the front
screened from view from the public right-of-way façade of the principal structure.
and does not exceed 15 feet in height.
D. Parking shall not be permitted within areas that
C. Chimneys or antenna that are located upon are intended for sidewalks, walkways, or lawn
or integrally part of the roof may exceed the areas.
maximum allowable height provided that they do
E. Driveways or parking areas shall be constructed
not extend greater than 15 feet above the height
of concrete, asphalt, or other materials approved
of the roof.
by the Building Department.
§7-1-2 Corner Visibility §7-1-4 Flag Lots
A. Within the triangular area formed by two
A. No lot shall be divided so that the minimum lot
intersecting right-of-way lines and a line
size and minimum lot width are less than required
connecting points on such right-of-way 30 feet
by this chapter.
from their point of intersection, the following
regulations shall apply to allow maximum B. Any application to establish a flag lot must
vehicular visibility: be accompanied by a fire safety plan that
demonstrates the ability to accommodate
1. Maximum structure height: two feet; emergency vehicles in accordance with
2. Trees shall be maintained to allow between 2 the requirements of the Lackawanna Fire
and 10 feet of vertical clearance below lowest Department. Flag lots in existence as of the
branches; and, effective date of this section shall constitute
3. Signs are prohibited within the corner nonconforming lots, provided that the pole does
visibility triangle. not meet minimum frontage requirements for the
district in which the lot is located.
Page 71
48 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§7-1-5 Yards on Corner Lots C. Protect the users of adjacent properties from
nuisances caused by the noise, fumes, and glare
A. The shorter property line abutting two streets of headlights which may result from the operation
on a residential corner lot shall be considered of vehicles;
the front lot line. The exterior side yard shall be
D. Minimize further expansion of impervious
considered the side yard that abuts a public
surfaces within the City and reduce loss of green
right-of-way.
space; and,
B. The exterior side yard for any building or
E. Provide safe traveling conditions and off-street
structure on a corner lot shall meet the front yard
accommodations for motorists, pedestrians, and
requirement for the district within which it is
bicyclists.
located.
C. Fences may project into an exterior side yard in §7-2-2 Applicability
accordance with the following:
A. All nonresidential, mixed-use, and multi-family
1. For lots that are less than 60 feet in width, a development shall meet the requirements
fence may be established within the exterior of this chapter. No building permit shall be
side yard provided that it is a minimum of 3 issued for any use that does not conform to the
feet from the public right-of-way. requirements herein.
2. For lots that are greater than or equal to 60 1. 1, 2, and 3-Unit Housing shall be exempt from
feet in width, a fence may be established the requirements of this article, except for
within the exterior side yard provided that those located within the Central Business
it is a minimum of 10 feet from the public District (CBD).
right-of-way.
2. The provision and maintenance of off-street
3. Yards that abut a driveway must incorporate parking and loading areas is a continuing
a chamfer into the fence in the area adjacent obligation of the property owner.
to the driveway in order to maintain visibility
3. New construction and infill development
for pedestrians and passing vehicles.
shall be in conformance with all
§7-2 CIRCULATION, requirements of this article, unless otherwise
provided herein.
PARKING, LOADING AND
STACKING §7-2-3 No Minimum Parking
Requirements
§7-2-1 Purpose
The regulations do not mandate a minimum number
Regulations for parking, loading and stacking are of automobile parking spaces and recognize that
established to advance the safety, organization, and excessive off-street parking for automobiles conflicts
compatibility with their surroundings. Requirements with the city's goals related to transportation, land
for parking loading and stacking are set forth to use, and sustainability.
achieve the following:
A. To promote the safety and convenience of
§7-2-4 Continuation of Facilities
pedestrians, motorists, and bicyclists by Existing parking, loading or stacking facilities shall be
designing and locating parking areas to lessen continued and maintained, and shall not be reduced
the potential for conflicts among these groups; below the requirements of this chapter, for the
B. Reduce congestion on the primary street duration that the principal use is maintained.
networks of the City;
§7-2-5 Fractional Requirements.
Page 72
PART 7 General Development Standards 49 OF 148
Where the determination of minimum loading, §7-2-7 Off Street Parking Space
stacking, electric vehicle charging, or minimum
bicycle parking requirements result in a fractional
and Parking Lot Design
number, any fraction of ½ or less shall be disregarded, A. Parking Space Dimension
while a fraction greater than ½ shall be counted as (1)
1. Off street parking spaces shall have a
space.
minimum width of 9’ and a minimum length
§7-2-6 General Provisions of 19’.
2. Parallel parking spaces shall have a
A. Parking facilities shall be unobstructed and free
minimum width of 9’ and a minimum length
of other uses.
of 22’.
B. Parking facilities shall not be used for automobile
3. Minimum aisle width shall be as follows:
storage, commercial repairs, sales or service.
C. The parking and storage of inoperable vehicles §7-2-8 Parking, Loading, and
shall be located within an enclosed structure MINIMUM AISLE WIDTH
only. Parking of such inoperable vehicles ANGLE OF PARKING ONE WAY TWO WAY
outdoors shall be prohibited.
Parallel 13
D. All off-street parking facilities shall be provided
as set forth in this chapter at the time of the 30 degrees 13
construction, enlargement or conversion of any
45 degrees 13 24
use, building or structure.
E. All parking facilities required for uses subject 60 degrees 18
to site plan review shall be landscaped and
90 degrees 24
screened from public view in accordance with
§7-4, Landscaping.
F. Off-street parking facilities shall be located on Stacking Area Design
the same lot as the building to which it is an Requirements
accessory use.
A. Grading and Paving. Parking, Loading, and
G. Parking areas shall not be located within a
Stacking areas and access driveways shall be
required front yard.
graded and drained so that surface water does
H. No vehicles shall be parked on a lawn area. not run off onto adjacent properties. Parking
areas and driveways shall be constructed as
required by the Code Enforcement Officer.
B. Features. Parking Loading and Stacking areas
shall be arranged, marked and maintained in
accordance with the approved site plan on
record to provide the orderly and safe parking
and storage of vehicles.
1. Parking spaces shall be delineated by
painted lines.
2. The use of parking bumpers is prohibited
within parking lots.
Page 73
50 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
C. Illumination. Parking Loading and Stacking §7-2-10 Bicycle Parking
areas shall be illuminated in accordance with the
standards set forth in §7-5, Site Lighting. A. Bicycle parking must be provided in the CBD, NB,
RC, ENT, and OS zoning districts, in a quantity not
D. Pedestrian Accommodations. Pedestrian walks
less than the following:
shall be provided from the parking facilities to the
main building entrances.
E. Driveways to Parking, Loading, and Residential Uses .5 per unit, 20 max
Stacking Areas. (more Than 4 units)
1. Entrance and exit driveways that serve Commercial Uses 1 per 3,000 SF, 20 spaces max
parking, loading, and stacking facilities shall
Public and Civic Uses 1 per 3,000 SF, 20 spaces max
be provided in a location, size, and number
as to interfere as little as possible with the Industrial Uses 1 per 10,000 GSF
use of adjacent property and the flow of
traffic onto streets to which they connect.
B. Bicycle parking must be located on site and be
Parking Rooms. Parking areas that serve a publicly available in a location that is visible from
development of 100,000 SQFT or greater shall be the public right-of-way.
divided into parking rooms.
C. Each required bicycle parking space must be
1. Each parking room shall not exceed 80 1.5 feet by 6 feet to accommodate the ability for
parking spaces and shall be connected to an a bike to be locked on both sides of the parking
internal system of roadways. space. Each side of the bicycle parking space
shall be counted as (1) required space.
§7-2-9 Shared Parking
D. Required bicycle parking spaces must be located
Nonresidential uses may make arrangements for on a paved or pervious surface.
shared parking with other nonresidential uses. All
shared parking agreements must meet the following
standards: §7-2-11 Electric Vehicle Charging
A. Shared parking facilities must be located within Stations
500 feet of the primary building entrance. A. For multi-family residential uses (more than 4
B. Off-site shared parking facilities that serve a units), commercial uses, and industrial uses, 1% of
nonresidential use shall not be located within a all parking spaces must be electric vehicle ready,
residential zoning district. with a minimum of 2 EV-ready spaces for parking
lots over 20 spaces. At a minimum, EV-ready
C. If an off-site shared parking facility is not under
spaces must have conduit or other means
the same ownership as the use that it serves,
connected to power to each space at the time of
a written copy of the agreement attested by
construction of the parking facility.
both parties shall be provided to the Code
Enforcement Officer for recordation.
§7-2-12 Residential Parking
Requirements
A. The following standards apply in the residential
districts:
1. Parking is permitted within the required front
yard provided that the vehicles are located
on an approved driveway.
2. Parking is prohibited on grass areas and yard
Page 74
PART 7 General Development Standards 51 OF 148
space that is not hard-surfaced and properly not be designed or used to interfere with the free
designated for such use. use of any street, alley, or adjoining property.
3. Only one curb cut shall be permitted D. An off-street loading facility shall not be used for
per residential lot and shall conform to the repair or service of any motor vehicles.
the standards set forth by the City of E. Each off-street loading space shall be at least 20
Lackawanna in Chapter of 194: Streets and feet long by 12 feet wide.
Sidewalks of City Code.
F. The following off-street loading facilities shall be
4. The parking or storage of any vehicle or provided:
trailer being used for commercial purposes
over the tare weight of 5 tons shall not be
permitted on a residential parcel other than
being completely enclosed within a garage USE SQUARE FEET NUMBER OF BAYS
or other structure. Retail Under 5,000 1
4. Parking of personal seasonal vehicles, boats,
5,001 – 10,000 2
trailers, or recreational vehicles is permitted
from May 1st to October 31st, provided such Each Additional 10,000 1 Additional Space
vehicles:
Wholesale Under 40,000 1
a. Are registered and licensed; and Industrial
b. Are not used for living purposes; Operations 40,001 - 100,000 2
c. Are not parked within the front yard area; 100,000 and greater 3
d. Are parked on an approved surface; and,
Health-care 50,000 and greater 2 Bays, 1 of
e. Do not obstruct vehicular, pedestrian, or facilities with Which is for
bicyclist vision and access. ambulatory Emergency
service Vehicles
§7-2-13 Loading Facilities
All commercial and industrial uses shall provide
adequate off-street facilities for loading and §7-2-14 Stacking
unloading. Loading facilities shall be provided and
A. In addition to minimum parking and loading
maintained as long as the building is occupied, unless
requirements, drive-in facilities shall provide
equivalent facilities are provided in accordance with
five spaces per lane, booth, customer facility or
this chapter. Loading facilities shall meet the following
service window.
standards:
B. Drive-in facilities shall be sited to facilitate
A. Required off-street loading facilities shall not face principal on-site vehicular circulation and
or be visible from the frontage street, shall not be discourage vehicle stacking on the adjacent
located in a required front yard and may not be street.
located in a required side or rear yard if adjoining
C. The size of each stacking space shall be 20 feet
a residential district.
in length by nine feet in width.
B. Each required off-street loading space shall be
designed for vehicular access by means of a
driveway(s) to a public street.
C. Off-street loading facilities and driveways shall
Page 75
52 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§7-3 EROSION AND
SEDIMENTATION
[Amended 2-5-2008]
MINIMUM MAXIMUM
A. All land development activities subject to SLOPE SLOPE
regulation under Article XII of this chapter Planting areas 2% 12%
shall comply with the performance and design
criteria and other requirements set forth therein, Parking lot pavement 2% 4%
including the preparation of a stormwater
Driveways, access drives 2% 6%
pollution prevention plan.
B. For all construction activities that are not Pedestrian pavements 1% 2%
subject to regulation under Article XII of this
Sidewalks 1% 5%
chapter, and where a significant soil erosion or
sediment deposition may occur as a result of the Cut and fill slopes 12%
disturbance of the land, the City Planning and
Development Board may require an application
for site plan review to be accompanied by an §7-4 LANDSCAPING
erosion and sediment control plan conforming
to the standards and practices contained in the §7-4-1 Purpose
USDA Natural Resources Conservation Service
A. It is the purpose of this chapter to promote better
Engineering Field Services Manual (EFM) and
site design, introduce shade and habitat, prevent
the New York Standards and Specifications for
the erosion of soils, provide water absorption
Erosion and Sediment Control, or other erosion
and retention to limit excess stormwater runoff,
and sediment control manual recognized by
enhance air quality, provide natural buffers to
the Engineering Department or Planning and
development, and enhance the aesthetic and
Development Board.
scenic beauty of the City of Lackawanna.
C. Final grading shall coincide with the planting
B. The standards set forth in this chapter are
season to ensure quick soil stabilization;
intended to:
D. Construction phase topsoil stockpiles shall be
1. Dissuade the unnecessary clearing and
graded and covered or seeded within one month
disturbing of land and preserve the natural
of deposition;
growth of existing flora.
E. Upon construction completion, temporary
2. Conserve and stabilize property values,
berms, swales, settling ponds and other erosion
preserve a healthy environment, and facilitate
control mechanisms shall be reshaped and
the creation of a convenient, attractive, and
planted or otherwise maintained to conform with
harmonious community environment.
an approved site plan and to comply with any
stormwater pollution prevention plan approved 3. Provide shade.
by the City for the project; and, 4. Reduce the level of carbon dioxide and
F. All new developments must meet the following airborne pollutants and return oxygen to the
gradient standards: atmosphere.
5. Provide unpaved areas for the absorption of
surface waters.
Page 76
PART 7 General Development Standards 53 OF 148
§7-4-2 Applicability 2. One planting unit shall consist of 1 deciduous
shade tree and 5 shrubs.
A. All developments subject to site plan review
3. A minimum of one planting unit shall be
in accordance with §11-5shall meet the
required per 30 linear feet or fraction thereof.
requirements of this Section. A separate
landscape plan shall be submitted and approved, 4. Properties with 80% or greater building
approved with conditions or denied as a part of coverage shall be excluded from providing
this review procedure. site landscaping.
B. The landscape plan shall be prepared by 5. The Planning and Development Board may
a licensed landscape architect unless the alter the number of required planting units if
landscape plan is submitted as part of a minor existing site landscaping is present and will
site plan as defined in §11-5. be retained.
C. A revised site plan shall not diminish the B. Screening of Mechanical Equipment.
landscaping of the site below the requirements of 1. Non-single-family residential properties
this section. which may be viewed from residential uses,
public streets or public park areas shall
§7-4-3 General Requirements screen all roof, ground and wall mounted
A. Existing and natural features and vegetation shall mechanical equipment (utility structures,
be preserved and incorporated in the landscaped multiple meter boards, generators, air
area wherever possible. conditioning units, backflow preventor [RPZ]
B. Required landscaped areas shall be designed as hot boxes, etc.) from view at ground level of
an integral part of the site development and shall the property line.
be dispersed throughout the development site 2. Roof-mounted mechanical equipment shall
and vehicle use areas. be screened or arranged so as to not be
C. Plastic or other types of artificial plantings or visible from residential uses, public streets or
vegetation shall not be permitted. park areas and be shielded from view on four
sides. Screening shall consist of materials
D. All shrubs planted shall have a minimum height
consistent with the principal building
of 24 inches above the ground except when being
materials.
used as ground cover. All evergreen shrubs used
for screening shall have a minimum height of 48 3. Mechanical equipment shall not be mounted
inches (4 feet) above the finished grade. All large on the roof or located in the front yard in any
and small deciduous trees planted shall have single-family residential district.
a minimum caliper of two and one-half inches, 4. Wall or ground-mounted equipment
measured six inches above the ground. screening shall be constructed of:
a. Planting screens;
§7-4-4 Buffers and Screening
b. Brick, stone, reinforced concrete, vinyl
A. General Requirements
stockade or other similar material; and,
1. Landscaping is required along all side and c. Redwood, cedar, preservative pressure
rear property boundaries except when treated wood, or other similar materials.
approved shared parking lots adjoin abutting
properties.
Page 77
54 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§7-4-5 Dumpsters and Refuse §7-4-7 Parking Lots and Vehicle
Containers Use Areas
A. The following standards shall apply to dumpsters A. An interior landscaped island shall be provided
and other refuse collection areas in the R-3, CBD, for every 15 spaces. Each island shall have a
NC, RC, and ENT districts. minimum width of eight feet inside the curb and
B. Dumpster containers, other refuse containers, a minimum length of 16 feet for a single row and
and all refuse shall be visually screened on all 32 feet for a double row. Interior islands may be
sides from adjacent properties and private or consolidated, or intervals may be expanded to
public rights of way with an opaque material, preserve existing trees or facilitate snow plowing
which may include shrubs, walls, fences or if approved by the Planning and Development
berms. Materials and dumpsters stored in said Board, as applicable.
areas shall not protrude above the screen. B. All rows of spaces shall terminate in a
C. The setbacks for dumpsters in nonresidential landscaped island. Each island shall conform
districts shall be five (5) feet from the property to the specifications described in (A) above.
line of adjacent nonresidential districts and Terminal island intervals may be modified to
ten (10) feet from the property line of adjacent preserve existing trees or facilitate snow plowing
residential districts. if approved by the Planning and Development
Board, as applicable.
§7-4-6 Fences C. A minimum of one large deciduous tree shall be
A. Front yard fencing may not exceed three feet in provided for each landscaped island that is equal
height if comprised of a solid material. A front to or greater than 128 square feet. One additional
yard fence may be a maximum of four feet in large deciduous shade tree shall be provided
height if comprised of a transparent material. within landscaped islands for each 100 square
feet in excess of 128 square feet.
B. Perimeter fencing is prohibited in all front yards
within three feet of any sidewalk. D. In addition to trees, all landscaped islands and
divider medians shall be landscaped with grass,
C. The use of barbed wire and other security fencing
ground cover, shrubs or other landscape material
is prohibited.
acceptable to the Planning Board or Director of
D. The maximum height if a fence shall not exceed Development.
six feet measured from average finished grade,
E. All islands and medians shall have six-inch-high
except,
concrete curbing as a minimum to protect plant
1. Tennis courts and basketball courts may be materials from damage.
fully enclosed with a fence up to 12 feet in
height.
E. All fencing must follow the grade of the property
on which it is installed.
Page 78
PART 7 General Development Standards 55 OF 148
§7-4-8 Enforcement and 3. Multi-family dwellings over four units.
Maintenance B. Lighting Plan. A lighting plan shall be submitted
as part of the site plan review process. Lighting
A. All landscaped areas required and/or permitted
plans must be prepared by a lighting professional
by these regulations shall be maintained
and just include the following:
and preserved according to the approved
landscape plan. Landscaped areas shall be 1. Location of all exterior lights and their
kept free of trash, litter, weeds and other such specifications.
materials. Failure to maintain the landscaping 2. The level of illumination at each property line,
in accordance with the approved landscape measured in footcandles.
plan or to keep landscaped areas free of trash,
3. Height of pole and fixture and/or distance
litter, weeds and other such materials shall be a
above grade for wall-mounted lighting
violation of this Ordinance, and this requirement
fixtures.
shall be enforced by the Code Enforcement
Office. 4. A detail of the proposed light fixtures and any
shielding.
B. All plant materials provided for a development
in accordance with the approved landscape C. The following minimum lighting levels shall be
plan shall be in a healthy and vigorous provided for uses requiring site plan review:
growing condition and exhibit good form. All 1. Parking lots: 0.5 footcandles.
plant materials which are considered to be
2. Driveways: 0.25 footcandles.
unacceptable for the purposes of compliance
with these regulations shall be replaced with 3. Pedestrian walkways: 0.18 footcandles.
acceptable plant material prior to the issuance of 4. Building entrances: 0.5 footcandles.
a final Certificate of Occupancy or Certificate of
5. Accent illumination: 0.5 footcandles.
Compliance by the Code Enforcement Office.
D. All outdoor lighting shall be designed and located
C. Plantings intended to serve as a visual screen
such that the maximum illumination measured
which die or are not maintained in a healthy
in footcandles at the property line does not
and growing condition after three years from
exceed 0.2 on adjacent residential use, and
the date of issuance of the final Certificate of
0.5 on adjacent commercial sites and public
Occupancy or Certificate of Compliance by the
rights-of-way.
Code Enforcement Office shall be replaced with
plantings of a size and nature sufficient to achieve E. Light sources shall not be higher than 20 feet;
the visual screen intended. pedestrian light fixtures shall not exceed 15 feet in
height.
§7-5 LIGHTING F. Security lighting fixtures and exterior wall-
A. Applicability. These regulations shall apply to all mounted floodlights are restricted to enclosed
exterior lighting on any property utilized for the service courtyards.
following purposes: G. High intensity lighting is prohibited.
1. Nonresidential uses, including industrial
uses;
2. Mixed-uses, whether located on the same
site or within the same structure; and,
Page 79
56 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§7-6 MCKINLEY PARKWAY §7-7 OUTDOOR STORAGE
A. Design standards. Along McKinley Avenue, AND DISPLAY
from McKinley Circle to South Park Avenue, the A. Outdoor display and storage shall be allowed
following regulations shall apply in addition to in the RC and ENT districts in accordance with
those regulations of the underlying zone: this Section. Any merchandise, material or
1. The use of the following high canopy street equipment situated outdoors shall be subject to
tree species is encouraged: the requirements of this Section.
a. Acer plananoides Cleveland— B. Outdoor Display. Outdoor Display constitutes the
Norway Maple cultivar. display of items that are actively for sale.
b. Acer rubrim Autumn Blaze or Karpick— 1. Outdoor Display shall be permitted only in
Red Maple cultivar. a location that is adjacent to a wall of the
principal building and shall not be permitted
c. Fraxinux excelsior Empire—
to block windows, entrances or exits, and
European Ash cultivar.
shall not impair the ability of pedestrians to
d. Quercus rubrum—Northern Red Oak. use the building and sidewalk.
e. Tilia cordata Crimean, Glen Haven, C. Outdoor Storage is the temporary storage of
Greenspire or Redmuond— goods in individual packaging and not in storage
Littleleaf Linden Cultivar. containers. Organic materials stored on pallets
f. Ulmus Delaware, Homestead, or are considered limited outdoor storage.
Liberty—Elm cultivar. 1. No outdoor storage shall be permitted within
2. Sign design. the following areas:
a. Signposts and signs shall be finished in a. The public right-of-way;
a dark color, preferably black with green b. Any required landscape area;
in it, so as to be visually recessive and
c. A required front or side setback;
provide a parklike image.
d. Between a front setback and the building
b. Sign lettering and graphics should be
front;
white, silver or gold.
e. Between a side setback along a public
3. Paving materials. right-of-way and any structure; and,
a. Where slope, durability or reduced d. Any required off-street parking areas.
maintenance is required, asphalt or a
dark-pigmented concrete should be used.
b. The use of unit pavers such as brick
should be limited to areas of special
importance such as entrances.
Page 80
PART 7 General Development Standards 57 OF 148
§7-8 SEAWAY TRAIL C. To reduce signs or advertising distractions
or obstructions that may contribute to traffic
A. Design standards. Where a property abuts Route accidents.
5/Seaway Trail it shall comply with the following
design guidelines in addition to those regulations §7-9-2 Definitions
of the underlying zone:
Sign. Any device visible from a public place whose
1. A public view of Lake Erie shall not be purpose and design is to convey messages by means
obstructed for more than 400 feet. of words or images. A sign is not used to describe
2. Where a building obstructs a public view of public art that contains no commercial messages.
Lake Erie, side yards shall be a minimum of
Sign Face. The surface upon, against, or through
100 feet in width.
which the sign copy is displayed or illustrated, not
3. Parking lots shall be screened from view on including structural supports, architectural features of
the Seaway Trail through the use of dense a building or sign structure, non- structural thematic
vegetation. or decorative trim, or any areas that are separated
4. No fences, walls or hedges greater than four from the background surface upon which the sign
feet shall be erected, placed or maintained copy is displayed by a distinct delineation, such as a
between the waters of Lake Erie and the reveal or border.
nearest point of the principal building located
Sign, Off Premise. A permanent sign erected,
on the premises.
maintained, or used for the purpose of the display
5. Seaway Trail, Inc., logo shall be incorporated of messages not related to the use of, products sold
in signs visible from Route 5. on, or the sale or lease of, the property on which it is
6. Daffodils should be incorporated in displayed. Also called a billboard.
landscaped areas along Route 5.
Sign, On-Premise. A sign erected, maintained, or
7. Pedestrian and bicycle facilities shall be used for the purpose of the display of messages
provided along the entire length of Route 5 relating to the use of, products sold on, or the sale or
with pedestrian overlooks on bridges where lease of, the property on which it is displayed.
possible.
Pole Sign. A sign that is mounted on a freestanding
§7-9 SIGNS pole or other support so that the bottom edge of the
sign is a minimum of 8 feet above finished grade.
§7-9-1 Purpose
Ground Sign. A sign supported by uprights or braces
These sign regulations are intended to control the placed upon or in the ground and not attached to any
size, style, and location of signage within the City of building.
Lackawanna to achieve the following purposes:
Wall Sign. A sign integral with or attached to and
A. To create a more attractive business atmosphere supported by the exterior wall of a building.
and to protect against the effects of out-of-scale
signage. Message Center Sign. A sign supported by
uprights or braces placed upon or in the ground
B. To provide reasonable, yet appropriate, conditions
and not attached to any building which contains
for advertising goods sold or services rendered
an illuminated, programmatic message, or graphic,
in business districts by relating the size, type and
whether fixed or moving.
design of signs to the type of establishment.
Projecting Sign. A sign attached perpendicular to a
building or other structure.
Page 81
58 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
Awning Sign. A sign painted on, attached to or §7-9-4 Signs Exempt from
otherwise displayed on an awning. This sign type
does not include canopies over gas pumps.
Regulation
A. Customary holiday decorations;
Window Sign. A temporary, non-structural sign
B. House addresses, family name signs, “no
located in the interior of a window or door or any
trespassing” and similar signs;
other sign inside a building that contains a message
legible from the public right-of-way or adjacent C. Traffic control signs;
property clearly intended for public recognition from D. Gasoline price signs attached to a gasoline
outside the building. dispenser or service island canopy and not
exceeding one square foot per face;
§7-9-3 Prohibited Signs
E. Political signs not exceeding four square feet in
A. Any sign mounted, attached or painted on a area erected no earlier than three weeks before
trailer, boat, or motor vehicle when parked, an election and removed within seven calendar
stored, or displayed conspicuously on the public days following the election;
right-of-way or private premises in a manner
F. Real estate signs not exceeding six square feet in
intended to attract attention of the public for
area;
advertising purposes. This provision expressly
excludes business signs that are permanently G. No more than two directional and parking signs
painted on, or magnetically attached to, motor not exceeding two square feet per face and no
vehicles that are regularly used to conduct taller than seven feet high per business;
normal business activities. H. Signs, flags or emblems erected and maintained
B. Signs, as regulated by this Ordinance, used to pursuant to any government function;
attract attention to an object, product, place, I. Decorative or architectural features of a building,
activity, institution, organization or business not except letters or trademarks;
available or located on the premises where the
J. Memorial or historic plaques, markers,
sign is located.
monuments or tablets;
C. Signs advertising or identifying a business which
K. Safety signs; and,
is no longer operating. Any sign accessory or
incidental to a business shall be removed within L. One construction or renovation sign, four square
30 days after the business ceases to operate. feet in size or less, erected by a contractor,
engineer, architect or similar professional or
D. Signs that create a traffic hazard by obstructing
business and removed at the termination of their
the view at any street intersection or by design
portion of the project activity.
resemblance through color, shape or other
characteristics common to traffic control devices.
§7-9-5 General Standards
E. Rotating or revolving signs.
A. No person shall erect, alter, construct or
F. Banners, posters, pennants, ribbons, streamers, relocate any sign without having first obtained
spinners or other similar moving, fluttering or a sign permit from the Zoning Officer, upon
revolving devices or strings of lights. a demonstration of full compliance with the
G. Signs for businesses that have not received an provisions of this chapter.
approved business registration from the City of B. Signs located along state highways, including NY
Lackawanna. Route 5, should be submitted to the New York
State Department of Transportation for review
and approval where appropriate.
Page 82
PART 7 General Development Standards 59 OF 148
C. In general, all signs shall be permanently 2. The height of an awning, projecting,
mounted and securely anchored. All ground suspended, wall, or window sign shall
signs must be sufficiently secured to prevent be determined by measuring the vertical
movement from wind. distance between the top part of the sign
D. Illumination. face or structure, whichever is highest, to the
bottommost edge of the sign face.
1. Sign illumination shall not cause direct light
rays to cross any property line. §7-9-7 Signs Requiring a Permit
2. Sign illumination shall not cause an increase Upon issuance of a building permit in accordance
in light measured at any property line, with Chapter 75: Building Code Administration, the
other than a street line, of more than one following sign types are permitted pursuant to the
foot-candle. following standards:
§7-9-6 Measurement A. Building Mounted Signs.
A. Sign Area. 1. Wall Sign.
1. One-sided sign. The area of a sign shall be a. Wall signs shall not extend beyond the
computed by means of the smallest square, above or beyond the ends of a building
circle, rectangle, triangle, or geometric or its parapet, or the highest point of the
combination thereof that will encompass the roof, whichever is higher.
extreme limits of the writing, representation, b. Wall signs shall not project more than 12
graphic, and/or other display, together with inches from the wall face.
any material, backdrop, or structure on which
it is placed. 2. Awning Sign.
a. No sign shall exceed 20% of the area of
2. Two-sided sign. In the case of a two-sided
the awning on which it is located.
sign, only one side of the sign is considered
in determining sign area if the sides of the 3. Projecting Sign.
sign are back-to-back or diverge at an angle
a. Only one projecting sign is permitted per
of 45° or less. No sign shall be permitted to
building frontage that has an entrance for
have more than two sides.
the general public
3. The supporting structure of a sign shall not
b. A projecting sign shall not exceed 16
be computed as part of the sign area unless
square feet per side.
such supporting structure or bracing is made
a part of the message with the inclusion of c. Signs that encroach into a public right-
any text or graphics. of-way shall require a permit by the
appropriate issuing body prior to their
B. Sign Height.
installation.
1. The height of a freestanding sign shall d. The bottom edge of the sign shall be a
be calculated by measuring the vertical minimum height of 8 feet from finished
distance between the top part of such sign grade.
or its structure, whichever is highest, to the
elevation of the ground directly beneath the 4. Window Sign.
center of the sign. a. No sign shall exceed 20% of the area of
an individual windowpane.
Page 83
60 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
B. Free Standing Signs. C. Other Signs.
1. Ground Sign 1. Home Occupation Sign.
a. One ground sign shall be permitted per a. There shall only be one sign permitted
building on a single parcel. per home occupation.
b. Ground signs shall have a maximum b. Home occupation signs shall be non-
height of 8 feet, measured from finished illuminated and shall be a maximum of 2
grade to the tallest point of the sign square feet in area.
structure. c. Home occupation signs must be affixed to
c. The maximum total face area for a ground a building wall and are not permitted as a
sign shall be 160 square feet. freestanding sign.
d. Ground signs shall be setback a minimum
of 15 feet from any public right-of-way, 25
§7-9-8 Sign Area
feet from any residential lot, and 10 feet A. The maximum area of all signs, excluding those
from any non-residential lot. that are listed as exempt in §7-9-4 of this Chapter,
shall be calculated based on the zoning district
e. The base of the sign shall be no less than
in which the property is located and the length of
75% of the width of the sign.
the façade of the principal building in linear feet
2. Message Center Sign. that faces a public right-of-way.
a. A message center sign shall only B. In the instance that a building on a corner lot has
be permitted as part of a permitted two or more principal building facades that face a
freestanding sign. public right-of-way, the allowable sign area shall
b. Message center signs are not permitted in be calculated by taking a sum of the lengths of
the R-1, R-2, R-3, and NC zoning districts. each right-of-way facing façade in linear feet.
c. The information displayed on a message C. The minimum allotted sign face area for any
center sign shall stay static for a minimum non-residential building shall be 50 square feet.
of 10 minutes. D. The following table shall be used to calculate the
d. Each message center sign shall be allowable sign face area:
equipped with dimming capabilities.
e. Message center signs shall not located on
a site in a manner that the sign is visible DISTRICT MULTIPLIER
from any residential use. Neighborhood Commercial (NC) 1.0
f. Pole SignPole signs shall be prohibited
Central Business District (CBD) 2.0
within the City of Lackawanna.
Regional Commercial (RC) 1.5
3. Menu Board Sign.
a. There shall be a maximum of two menu Enterprise (ENT) 1.5
board signs per drive thru lane.
Open Space (OS) 1.0
b. Menu board signs shall have a maximum
sign area of 36 square feet. The sign area Bethlehem Redevelopment Area (BRA) 1.5
of a menu board will not count towards
the total sign area for a development
permitted.
Page 84
PART 7 General Development Standards 61 OF 148
§7-10 SMOKES CREEK and increase stormwater runoff rates and
volumes, flooding, stream channel erosion, or
A. Design standards. sediment transport and deposition;
1. Within 15 feet of the mean water line of 2. This stormwater runoff contributes to
Smokes Creek, an undisturbed buffer of increased quantities of waterborne
native or naturalized vegetation shall be pollutants, including siltation of aquatic
established through the natural succession habitat for fish and other desirable species;
of existing plant materials. Within this buffer 3. Clearing and grading during construction
area no more than 10% of vegetation may be tends to increase soil erosion and add to
cleared to provide creek access. the loss of native vegetation necessary for
2. Within 50 feet of the mean water line of terrestrial and aquatic habitat;
Smokes Creek the following uses shall be 4. Improper design and construction of
permitted: stormwater management practices can
a. Trailways, overlooks, picnic shelters and increase the velocity of stormwater runoff,
other structures appropriate to passive thereby increasing streambank erosion and
recreational uses. sedimentation;
b. Access for water-related activities. 5. Impervious surfaces allow less water to
percolate into the soil, thereby decreasing
Stormwater detention/retention.
groundwater recharge and stream baseflow;
3. Within 50 feet of the mean water line of
6. Substantial economic losses can result from
Smokes Creek the following uses shall be
these adverse impacts on the waters of the
prohibited:
City;
a. Sand and gravel excavations;
7. Stormwater runoff, soil erosion and
b. Dumping of snow or ice containing nonpoint source pollution can be controlled
deicing agents; and minimized through the regulation of
c. Bulk storage of salt, chemicals or stormwater runoff from land development
petroleum products; and, activities;
d. Parking lots. 8. The regulation of stormwater runoff
discharges from land development activities
§7-11 SOUND in order to control and minimize increases
in stormwater runoff rates and volumes,
A. All sound and noise shall comply with the soil erosion, stream channel erosion, and
standards set forth in Chapter 159 of City of nonpoint source pollution associated with
Lackawanna Code. stormwater runoff is in the public interest
and will minimize threats to public health and
§7-12 STORMWATER safety; and,
MANAGEMENT 9. Regulation of land development activities by
[Added 2-5-2008] means of performance standards governing
stormwater management and site design will
§7-12-1 Findings; purpose. produce development compatible with the
natural functions of a particular site or an
A. Findings. It is hereby determined that:
entire watershed and thereby mitigate the
1. Land development activities and associated adverse effects of erosion and sedimentation
increases in site impervious cover often alter from development.
the hydrologic response of local watersheds A. Purpose. The purpose of this article is to establish
Page 85
62 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
minimum stormwater management requirements §7-12-2 Definitions
and controls to protect and safeguard the general
health, safety, and welfare of the public residing As used in this article, the following terms shall have
within this This article seeks to meet those the meanings indicated:
purposes by achieving the following objectives:
Agricultural Activity. The activity of an active farm
1. Meet the requirements of minimum measures including grazing and watering livestock, irrigating
4 and 5 of the SPDES General Permit for crops, harvesting crops, using land for growing
Stormwater Discharges From Municipal agricultural products, and cutting timber for sale,
Separate Storm Sewer Systems (MS4s), but shall not include the operation of a dude ranch
Permit No. GP-02-02, or as amended or or similar operation, or the construction of new
revised; structures associated with agricultural activities.
2. Require land development activities to
Applicant. A property owner or agent of a property
conform to the substantive requirements of
owner who has filed an application for a land
the SPDES General Permit for Stormwater
development activity
Discharges From Construction Activity,
Permit No. GP-02-01, or as amended or Building. Any structure, either temporary or
revised; permanent, having walls and a roof, designed for
3. Minimize increases in stormwater runoff the shelter of any person, animal or property, and
from land development activities in order to occupying more than 100 square feet of area.
reduce flooding, siltation, increases in stream
Channel. A natural or artificial watercourse with a
temperature, and streambank erosion and
definite bed and banks that conducts continuously or
maintain the integrity of stream channels;
periodically flowing water.
4. Minimize increases in pollution caused by
stormwater runoff from land development Clearing. Any activity that removes the vegetative
activities which would otherwise degrade surface cover.
local water quality;
DEC. The New York State Department of
5. Minimize the total annual volume of Environmental Conservation.
stormwater runoff which flows from
any specific site during and following Dedication. The deliberate appropriation of property
development to the maximum extent by its owner for general public use.
practicable; and, Design Manual. The New York State Stormwater
6. Reduce stormwater runoff rates and volumes, Management Design Manual (New York State
soil erosion and nonpoint source pollution, Department of Environmental Conservation), most
wherever possible, through stormwater recent version or its successor, including applicable
management practices and ensure that updates, which serves as the official guide for
these management practices are properly stormwater management principles, methods and
maintained and eliminate threats to public practices.
safety.
Developer. A person who undertakes land
development activities.
Erosion Control Manual. The New York Standards
and Specifications for Erosion and Sediment
Control (Empire State Chapter of the Soil and Water
Conservation Society, 2004), most current version or
its successor, commonly known as the "Blue Book.”
Page 86
PART 7 General Development Standards 63 OF 148
Grading. Excavation or fill of material, including the Nonpoint source pollution. Pollution from any
resulting conditions thereof. source other than from any discernible, confined, and
discrete conveyances, and shall include, but not be
Impervious Cover. Those surfaces, improvements
limited to, pollutants from agricultural, silvicultural,
and structures that cannot effectively infiltrate
mining, construction, subsurface disposal and urban
rainfall, snowmelt and water (e.g., building rooftops,
runoff sources.
pavement, sidewalks, driveways, etc.).
Phasing. Clearing a parcel of land in distinct
Industrial Stormwater Permit. A State Pollutant
pieces or parts, with the stabilization of each piece
Discharge Elimination System (SPDES) permit issued
completed before the clearing of the next.
to a commercial industry or group of industries
which regulates the pollutant levels associated with Pollutant of Concern. Sediment or a water quality
industrial stormwater discharges or specifies on-site measurement that addresses sediment (such as
pollution control strategies. total suspended solids, turbidity or siltation) and any
other pollutant that has been identified as a cause
Infiltration. The process of percolating stormwater
of impairment of any water body that will receive a
into the subsoil.
discharge from the land development activity.
Jurisdictional Wetland. An area that is inundated
Project. Land development activity.
or saturated by surface water or groundwater at
a frequency and duration sufficient to support a Recharge. The replenishment of underground water
prevalence of vegetation typically adapted for life reserves.
in saturated soil conditions, commonly known as
"hydrophytic vegetation." Sediment Control. Measures that prevent eroded
sediment from leaving the site.
Land Development Activity. Construction
activity including clearing, grading, excavating, soil Sensitive Areas. Coldwater fisheries, shellfish beds,
disturbance or placement of fill that results in land swimming beaches, groundwater recharge areas,
disturbance of equal to or greater than one acre, water supply reservoirs, or habitats for threatened,
or activities disturbing less than one acre of total endangered or special concern species.
land area that is part of a larger common plan of SPDES General Permit For Stormwater Discharges
development or sale disturbing one acre or more in From Construction Activity, Permit NO. GP-02-
the aggregate, even though multiple separate and 01. A permit under the New York State Pollutant
distinct land development activities may take place at Discharge Elimination System (SPDES) issued to
different times on different schedules. developers of construction activities to regulate
Landowner. The legal or beneficial owner of land, disturbance of one or more acres of land.
including those holding the right to purchase or lease SPDES General Permit For Stormwater Discharges
the land, or any other person holding proprietary From Municipal Separate Storm Sewer Systems
rights in the land. GP-02-02. A permit under the New York State
Licensed Professional. A professional engineer or Pollutant Discharge Elimination System (SPDES)
landscape architect licensed to practice his or her issued to municipalities to regulate discharges from
profession in New York State. municipal separate storm sewers for compliance with
EPA established water quality standards and/or to
Maintenance Agreement. A legally recorded specify stormwater control standards.
document that acts as a property deed restriction,
and which provides for long-term maintenance of Stabilization. The use of practices that prevent
stormwater management practices. exposed soil from eroding.
Page 87
64 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
Stop-Work Order. An order issued which requires are wholly or partially within or bordering the state
that all construction activity on a site be stopped. or within its jurisdiction. Storm sewers and waste
treatment systems, including treatment ponds or
Stormwater. Rainwater, surface runoff, snowmelt and lagoons which also meet the criteria of this definition,
drainage. are not waters of the state. This exclusion applies
Stormwater Management. The use of structural or only to man-made bodies of water which neither
nonstructural practices that are designed to reduce were originally created in waters of the state (such
stormwater runoff and mitigate its adverse impacts on as a disposal area in wetlands) nor resulted from
property, natural resources and the environment. impoundment of waters of the state.
Stormwater Management Facility. One or a series Watercourse. A permanent or intermittent stream
of stormwater management practices installed, or other body of water, either natural or man-made,
stabilized and operating for the purpose of controlling which gathers or carries surface water.
stormwater runoff. Waterway. A channel that directs surface runoff to a
Stormwater Management Officer (SMO). An watercourse or to the public storm drain.
employee or officer of the City of Lackawanna
designated by the City Council to accept and review
§7-12-3 Applicability; Exemptions;
stormwater pollution prevention plans (SWPPPs), Conflict with Other
forward the plans to such employee, officer or board Provisions
of the City of Lackawanna which may be reviewing A. Applicability. This article shall be applicable to all
any application for a construction activity requiring land development activities within the City.
submission of a SWPPP, and inspect stormwater
B. Exemptions. The following activities shall be
management practices.
exempt from review under this article:
Stormwater Management Practices (SMPs).
1. Agricultural activity;
Measures, either structural or nonstructural, that
are determined to be the most effective, practical 2. Silvicultural activity, except that landing areas
means of preventing flood damage and preventing or and log haul roads are subject to this article;
reducing point source or nonpoint source pollution 3. Routine maintenance activities that disturb
inputs to stormwater runoff and water bodies. less than five acres and are performed
to maintain the original line and grade,
Stormwater Pollution Prevention Plan (SWPPP). A
hydraulic capacity or original purpose of a
plan for controlling stormwater runoff and pollutants
facility;
from a site during and after construction activities.
4. Repairs to any stormwater management
Stormwater Runoff. Flow on the surface of the practice or facility deemed necessary by the
ground resulting from precipitation. SMO;
Surface Waters of The State Of New York. Lakes, 5. Land development activities for which a
bays, sounds, ponds, impounding reservoirs, springs, building permit has been approved on or
wells, rivers, streams, creeks, estuaries, marshes, before the effective date of this article;
inlets, canals, the Atlantic Ocean within the territorial 6. Cemetery graves;
seas of the State of New York and all other bodies of
7. Installation of fence, sign, telephone, and
surface water, natural or artificial, inland or coastal,
electric poles and other kinds of posts or
fresh or salt, public or private (except those private
poles;
waters that do not combine or effect a junction
with natural surface or underground waters), which
Page 88
PART 7 General Development Standards 65 OF 148
8. Emergency activity immediately necessary to modifications, or disapprove the SWPPP,
protect life, property or natural resources; to the employee, officer, or board of the
9. Activities of an individual engaging in home City which is reviewing an application for
gardening by growing flowers, vegetables or approval of a land development activity
other plants primarily for use by that person requiring submission of a SWPPP. A
and his or her family; and recommendation of approval shall only
be given if the SWPPP complies with the
10. Landscaping and horticultural activities in requirements of this article. In making
connection with an existing structure. a recommendation to approve with
C. Conflict. Where the conditions imposed by modifications or disapprove the SWPPP, the
any provisions of this article are either more SMO shall state the reasons for the decision
restrictive or less restrictive than comparable in writing.
conditions imposed by any other applicable law, 2. Review by final reviewing body. The
ordinance, resolution, rule or regulation of any employee, officer or board of the City
kind, the regulations which are more restrictive reviewing the application for approval of
and impose higher standards or requirements a land development activity shall review
shall govern. the SWPPP and recommendation of the
SMO and shall act to approve, approve with
§7-12-4 Procedure
modifications, or disapprove the SWPPP.
A. The City shall designate an SMO who shall Such reviewing body shall not act to approve
accept and review all SWPPPs. The SMO may. the SWPPP unless it complies with the
requirements of this article. If the reviewing
1. Review the SWPPPs;
body acts to approve with modifications or
2. Upon approval by the City Council, engage disapprove the SWPPP, the reasons for the
the services of a registered professional decision shall be stated in writing. In order
engineer to review the SWPPPs, to be approved, the applicant shall revise
specifications and related documents at a a SWPPP that has been approved with
cost not to exceed a fee schedule established modifications or disapproved in accordance
by the City Council; or with the recommendations of the reviewing
3. Accept the certification of a licensed body and shall submit the revised SWPPP to
professional that the SWPPPs conform to the such body for review.
requirements of this article. C. For all land development activities not subject
B. For all land development activities subject to to review by the Zoning Officer or Planning and
review and approval by the Zoning Officer or Development Board as stated in § 230-93B
Planning and Development Board under mobile of this article, the applicant or developer shall
home or site plan regulations, the applicant or be required to submit a SWPPP prepared in
developer shall be required to submit a SWPPP accordance with the standards contained in this
that complies with the requirements of this article article to the SMO, and such SWPPP must be
to the SMO, and the land development activity approved prior to commencement of the land
shall be reviewed subject to the standards development activity. Within 60 days of receipt of
contained in this article. a SWPPP, the SMO shall approve, approve with
modifications, or disapprove the SWPPP. Approval
1. Review by SMO. Within 60 days of receipt
shall only be given if the SWPPP complies with
of a SWPPP, the SMO shall forward the
the requirements of this article. In approving
SWPPP, together with his or her written
with modifications or disapproving the SWPPP,
recommendation to approve, approve with
the SMO shall state the reasons for the decision
Page 89
66 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
in writing. In order to be approved, an applicant d. Construction phasing plan describing
shall revise a SWPPP that has been approved the intended sequence of construction
with modifications or disapproved in accordance activities, including clearing and
with the recommendations of the SMO and shall grubbing, excavation and grading, utility
submit the revised SWPPP to the SMO for review. and infrastructure installation and any
other activity at the site that results in soil
§7-12-5 Stormwater Pollution disturbance. Consistent with the Erosion
Prevention Plans Control Manual, not more than five acres
shall be disturbed at any one time unless
A. Stormwater pollution prevention plan
pursuant to an approved SWPPP;
requirement. No application for approval of a land
development activity shall be reviewed and no e. Description of the pollution prevention
land development activity shall be commenced measures that will be used to control
until the SMO or such employee, officer or board litter, construction chemicals and
of the City which may be reviewing an application construction debris from becoming a
for approval of a land development activity pollutant source in stormwater runoff;
requiring submission of a SWPPP has received f. Description of construction and waste
a SWPPP the complies with the specifications in materials expected to be stored on
this article and has approved such SWPPP. site with updates as appropriate, and
B. Contents of stormwater pollution prevention a description of controls to reduce
plans. pollutants from these materials including
storage practices to minimize exposure of
1. All SWPPPs shall provide the following
the materials to stormwater, and spill-
background information and erosion and
prevention and response;
sediment controls:
g. Temporary and permanent structural and
a. Background information about the scope
vegetative measures to be used for soil
of the project, including the location, type
stabilization, runoff control and sediment
and size of the project;
control for each stage of the project,
b. (Site map/construction drawing(s) for from initial land clearing and grubbing to
the project, including a general location project close-out;
map. The site map should be at a scale
h. A site map/construction drawing(s)
of no smaller than one inch to 100 feet.
specifying the location(s), size(s) and
At a minimum, the site map should show
length(s) of each erosion and sediment
the total site area; all improvements;
control practice;
areas of disturbance; areas that will
not be disturbed; existing vegetation; i. Dimensions, material specifications and
on-site and adjacent off-site surface installation details for all erosion and
water(s); wetlands and drainage patterns sediment control practices, including
that could be affected by the land the siting and sizing of any temporary
development activity; existing and final sediment basins;
slopes; locations of off-site material, j. Temporary practices that will be
waste, borrow or equipment storage converted to permanent control
areas; and location(s) of the stormwater measures;
discharges(s);
k. Implementation schedule for staging
c. Description of the soil(s) present at the temporary erosion and sediment control
site; practices, including the timing of initial
placement and duration that each
practice should remain in place;
Page 90
PART 7 General Development Standards 67 OF 148
l. Maintenance schedule to ensure b. Description of each postconstruction
continuous and effective operation of the stormwater management practice;
erosion and sediment control practice; c. Site map/construction drawing(s)
m. Name(s) of the receiving water(s); showing the specific location(s) and
n. Delineation of SWPPP implementation size(s) of each postconstruction
responsibilities for each part of the site; stormwater management practice;
o. Description of structural practices d. Hydrologic and hydraulic analysis for all
designed to divert flows from exposed structural components of the stormwater
soils, store flows, or otherwise limit runoff management system for the applicable
and the discharge of pollutants from design storms;
exposed areas of the site to the degree e. Comparison of post development
attainable; and stormwater runoff conditions with
p. Any existing data that describes the predevelopment conditions;
stormwater runoff at the site. f. Dimensions, material specifications
and installation details for each
2. Land development activities meeting
postconstruction stormwater
Condition A, B or C below shall also include
management practice;
water quantity and water quality controls
(postconstruction stormwater runoff controls) g. Maintenance schedule to ensure
as set forth in § 230-94B(3) of this article as continuous and effective operation
applicable: of each postconstruction stormwater
management practice;
a. Condition A: stormwater runoff from
land development activity discharging a h. Maintenance easements to ensure access
pollutant of concern to either an impaired to all stormwater management practices
water identified on DEC's 303(d) list of at the site for the purpose of inspection
impaired waters or a total maximum daily and repair. Easements shall be recorded
load (TMDL) designated watershed for on the plan and shall remain in effect with
which pollutants in stormwater have been transfer of title to the property;
identified as a source of the impairment. i. Inspection and maintenance agreement
b. Condition B: stormwater runoff from land binding on all subsequent landowners
development activity disturbing five or served by the on-site stormwater
more acres. management measures in accordance
with § 230-96 of this article; and,
c. Condition C: stormwater runoff from land
development activity disturbing between j. For any land development activity
one and five acres of land during the meeting Condition A in § 230-94B(2), the
course of the project, exclusive of the SWPPP shall be prepared by a licensed
construction of single-family residences professional and must be signed by the
and construction activities at agricultural professional preparing the plan, who shall
properties. certify that the design of all stormwater
management practices meets the
3. SWPPP requirements for Conditions A, B requirements in this article.
or C (postconstruction stormwater runoff
controls):
a. All information in § 230-94B(1) of this
article;
Page 91
68 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
C. Other environmental permits. The applicant shall with these technical documents shall be
assure that all other applicable environmental presumed to meet the standards imposed by this
permits have been or will be acquired for the land article:
development activity prior to approval of the final
1. The Design Manual; and
stormwater design plan.
2. The Erosion Control Manual.
D. Contractor certification.
B. Equivalence to technical standards. Where
1. Each contractor and subcontractor identified stormwater management practices are not
in the SWPPP who will be involved in soil in accordance with technical standards, the
disturbance and/or stormwater management applicant or developer must demonstrate
practice installation shall sign and date a equivalence to the technical standards set forth
copy of the following certification statement in § 230-95A of this article and the SWPPP shall
before undertaking any land development be prepared by a licensed professional.
activity: "I certify under penalty of law that
C. Water quality standards. Any land development
I understand and agree to comply with the
activity shall not cause an increase in turbidity
terms and conditions of the stormwater
that will result in substantial visible contrast to
pollution prevention plan. I also understand
natural conditions in surface waters of the state
that it is unlawful for any person to cause
of New York.
or contribute to a violation of water quality
standards."
§7-12-7 Maintenance, inspection
2. The certification must include the name and and repair of stormwater
title of the person providing the signature,
facilities.
address and telephone number of the
contracting firm; the address (or other A. Maintenance and inspection during construction.
identifying description) of the site; and the 1. The applicant or developer of the land
date the certification is made. development activity or his or her
3. The certification statement(s) shall be representative shall at all times properly
included with and become part of the operate and maintain all facilities and
SWPPP for the land development activity. systems of treatment and control (and related
E. A copy of the SWPPP shall be retained at the appurtenances) which are installed or used
site of the land development activity during by the applicant or developer to achieve
construction from the date of initiation of compliance with the conditions of this article.
construction activities to the date of final Sediment shall be removed from sediment
stabilization. traps or sediment ponds whenever their
design capacity has been reduced by 50%.
§7-12-6 Performance and Design 2. For land development activities meeting
Criteria Condition A, B or C in § 230-94B(2) of this
article, the applicant shall have a qualified
All land development activities shall be subject to the
professional conduct site inspections and
following performance and design criteria:
document the effectiveness of all erosion
A. Technical standards. For the purposes of this and sediment control practices every seven
article, the following documents shall serve as the days and within 24 hours of any storm event
official guides and specifications for stormwater producing 0.5 inch of precipitation or more.
management. Stormwater management practices Inspection reports shall be maintained in a
that are designed and constructed in accordance site logbook.
Page 92
PART 7 General Development Standards 69 OF 148
B. Maintenance easement(s). Prior to the chapter entitled "Sample Stormwater Control
issuance of any approval that has a stormwater Facility Maintenance Agreement. The City,
management facility as one of the requirements, in lieu of a maintenance agreement, at its
the applicant or developer must execute a sole discretion, may accept dedication of any
maintenance easement agreement that shall be existing or future stormwater management
binding on all subsequent landowners served facility, provided such facility meets all the
by the stormwater management facility. The requirements of this article and includes
easement shall provide for access to the facility adequate and perpetual access and
at reasonable times for periodic inspection by sufficient area, by easement or otherwise, for
the City to ensure that the facility is maintained inspection and regular maintenance.
in proper working condition to meet design
standards and any other provisions established
§7-12-8 Administration and
by this article. The easement shall be recorded by Enforcement; Penalties for
the grantor in the office of the County Clerk after Offenses; Fees
approval by the counsel for the City.
A. Construction inspection.
C. Maintenance after construction. The owner or
1. Erosion and sediment control inspection.
operator of permanent stormwater management
practices installed in accordance with this article a. The SMO may require such inspections
shall ensure they are operated and maintained to as necessary to determine compliance
achieve the goals of this article. Proper operation with this article and may either approve
and maintenance also includes, as a minimum, that portion of the work completed or
the following: notify the applicant wherein the work
fails to comply with the requirements of
1. A preventive/corrective maintenance
this article and the SWPPP as approved.
program for all critical facilities and
To obtain inspections, the applicant shall
systems of treatment and control (or related
notify the SMO at least 48 hours before
appurtenances) which are installed or used
any of the following, as required by the
by the owner or operator to achieve the goals
SMO:
of this article.
i. Start of construction;
2. Written procedures for operation and
maintenance and training new maintenance ii. iInstallation of sediment and erosion
personnel. control measures;
3. Discharges from the SMPs shall not exceed iii. Completion of site clearing;
design criteria or cause or contribute iv. Completion of rough grading;
to water quality standard violations in
v. Completion of final grading;
accordance with § 230-95 of this article.
vi. Close of the construction season;
4. Maintenance agreements. The City shall
approve a formal maintenance agreement vii. Completion of final landscaping; or
for stormwater management facilities viii. Successful establishment of
binding on all subsequent landowners and landscaping in public areas.
recorded in the office of the County Clerk
as a deed restriction on the property prior
to final plan approval. The maintenance
agreement shall be consistent with the
terms and conditions of Appendix A of this
Page 93
70 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
b. If any violations are found, the applicant e. Submission of reports. The SMO may
and developer shall be notified in writing require monitoring and reporting from
of the nature of the violation and the entities subject to this article as are
required corrective actions. No further necessary to determine compliance with
work shall be conducted except for this article.
site stabilization until any violations f. Right-of-entry for inspection. When any
are corrected and all work previously new stormwater management facility is
completed has received approval by the installed on private property or when any
SMO. new connection is made between private
c. Stormwater management practice property and the public stormwater
inspections. The SMO is responsible system, the landowner shall grant to the
for conducting inspections of SMPs. All City the right to enter the property at
applicants are required to submit as-built reasonable times and in a reasonable
plans for any SMPs located on-site after manner for the purpose of inspection as
final construction is completed. The plan specified in § 230-97A(3) of this article.
must show the final design specifications
B. Performance guarantee.
for all stormwater management facilities
and must be certified by a professional 1. Construction completion guarantee. In order
engineer. to ensure the full and faithful completion of
all land development activities related to
d. Inspection of stormwater facilities
compliance with all conditions set forth by
after project completion. Inspection
the City in its approval of the SWPPP, the
programs shall be established on any
may require the applicant or developer to
reasonable basis, including but not
provide, prior to construction, a performance
limited to: routine inspections; random
bond, cash escrow, or irrevocable letter of
inspections; inspections based upon
credit from an appropriate financial or surety
complaints or other notice of possible
institution which guarantees satisfactory
violations; inspection of drainage basins
or areas identified as higher-than- completion of the project and names the
typical sources of sediment or other City as the beneficiary. The security shall
be in an amount to be determined by the
contaminants or pollutants; inspections
City based on submission of final design
of businesses or industries of a type
plans, with reference to actual construction
associated with higher-than-usual
and landscaping costs. The performance
discharges of contaminants or pollutants
guarantee shall remain in force until the
or with discharges of a type which are
surety is released from liability by the City,
more likely than the typical discharge
provided that such period shall not be
to cause violations of state or federal
less than one year from the date of final
water or sediment quality standards
acceptance or such other certification that
or the SPDES stormwater permit; and
the facility(ies) have been constructed in
joint inspections with other agencies
accordance with the approved plans and
inspecting under environmental or safety
specifications and that a one-year inspection
laws. Inspections may include, but are
has been conducted and the facilities have
not limited to: reviewing maintenance
been found to be acceptable to City. Per
and repair records; sampling discharges,
annum interest on cash escrow deposits
surface water, groundwater, and material
shall be reinvested in the account until the
or water in drainage control facilities;
surety is released from liability.
and evaluating the condition of drainage
control facilities and other stormwater
management practices.
Page 94
PART 7 General Development Standards 71 OF 148
2. Maintenance guarantee. Where stormwater e. A statement of the penalty or penalties
management and erosion and sediment that shall or may be assessed against the
control facilities are to be operated person to whom the notice of violation is
and maintained by the developer or by directed; and,
a corporation that owns or manages f. A statement that the determination of
a commercial or industrial facility, the violation may be appealed to the City
developer, prior to construction, may Council by filing a written notice of appeal
be required to provide the City with an within 15 days of service of notice of
irrevocable letter of credit from an approved violation.
financial institution or surety to ensure
proper operation and maintenance of all 2. Stop-work orders. The City may issue a
stormwater management and erosion control stop-work order for violations of this article.
facilities both during and after construction, Persons receiving a stop-work order shall
and until the facilities are removed from be required to halt all land development
operation. If the developer or landowner fails activities, except those activities that address
to properly operate and maintain stormwater the violations leading to the stop-work order.
management and erosion and sediment The stop-work order shall be in effect until
control facilities, the City may draw upon the City confirms that the land development
the account to cover the costs of proper activity is in compliance and the violation
operation and maintenance, including has been satisfactorily addressed. Failure
engineering and inspection costs. to address a stop-work order in a timely
manner may result in civil, criminal, or
3. Recordkeeping. The City may require entities
monetary penalties in accordance with the
subject to this article to maintain records
enforcement measures authorized in this
demonstrating compliance with this article.
article.
C. Enforcement and penalties.
3. Violations. Any land development activity that
1. Notice of violation. When the City determines is commenced or is conducted contrary to
that a land development activity is not this article, may be restrained by injunction
being carried out in accordance with the or otherwise abated in a manner provided by
requirements of this article, it may issue a law.
written notice of violation to the landowner. 4. Penalties. Except as otherwise stated in
The notice of violation shall contain: this article, violations of this article are
a. The name and address of the landowner, punishable as provided in §11-10 of this Code.
developer or applicant; 5. Withholding of certificate of occupancy. If
b. The address, when available, or a any building or land development activity
description of the building, structure is installed or conducted in violation of this
or land upon which the violation is article, the SMO may prevent the occupancy
occurring; of said building or land.
c. A statement specifying the nature of the 6. Restoration of lands. Any violator may be
violation; required to restore land to its undisturbed
d. A description of the remedial measures condition. In the event that restoration is
necessary to bring the land development not undertaken within a reasonable time
activity into compliance with this article after notice, the City may take necessary
and a time schedule for the completion of corrective action, the cost of which shall
such remedial action; become a lien upon the property until paid.
Page 95
72 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
D. Fees. In addition to any other fees required by 2. Fees for subsequent phases. For all land
law, any person undertaking a land development development activities to be completed in
activity regulated by this article shall, upon multiple phases over time, the applicant or
submission of a stormwater pollution prevention developer, in addition to the fee provided for
plan (SWPPP) to the City, pay the following fees in §7-12-8D (1) above, shall pay the City an
for review of the SWPPP and any subsequent additional $500 for each subsequent phase
revisions thereto and for related inspections after the first phase of the project, to be paid
authorized by this article. Such fees may be at the beginning of each such subsequent
amended by the City Council from time to time by phase.
resolution.
1. Fees for land development activities. Any
§7-13 UTILITIES
applicant or developer submitting a SWPPP A. All exterior on-site utilities shall be installed and
to the City for a project to be completed in a maintained underground.
single phase shall pay the City a fee based B. On-site underground utilities shall be designed
on the acreage of the entire development, in and installed to minimize surface disruption.
accordance with the following fee schedule.
C. Temporary overhead power and telephone
Any applicant or developer submitting
facilities are permitted during construction only.
a SWPPP to the City for a project to be
completed in multiple phases shall pay
the City a fee based on the acreage of the
entire development, including the acreage
of subsequent phases that are part of a
common scheme of development or sale, in
accordance with the following fee schedule,
and shall also submit the fees required under
§7-12-8D(2) below.
ACREAGE OF ENTIRE SWPPP REVIEW
DEVELOPMENT AND INSPECTION FEE
0 to 5 Acres $500
5 to 10 Acres $850
Over 10 Acres $850 + $300 for Every
5 Acres above 10 Acres
Page 96
PART 8 General Development Standards 73 OF 148
PART 8
ADDITIONAL USE REGULATIONS
§8-1 PURPOSE 5. A maximum of 2 bedrooms shall be permitted
for an accessory dwelling unit. A third
This article provides additional regulations for uses bedroom is permitted if built within the roof
that are generally considered to have a higher portion of the structure.
potential for incompatibility with residential or low
6. The accessory dwelling unit shall have its
impact commercial uses without proper mitigation
own entrance, which may be shared with the
measures.
principal dwelling by a common area.
§8-2 APPLICABILITY 7. A minimum of one (1) off street parking space
shall be provided with a maximum of two (2)
The following requirements are applicable to all uses, parking spaces permitted. Driveways shall
permitted (P) and specially permitted (S), as noted in not be expanded in the area between the
the use tables of §4-1 of this chapter. front wall of the principal structure and the
right-of-way line to accommodate required
§8-3 ACCESSORY DWELLING ADU parking.
UNITS 8. The principal dwelling or accessory dwelling
unit must be owner occupied. The property
Where permitted as an accessory use in Part 5, an
owner must certify that either unit is their
accessory dwelling unit may be constructed within
principal place of residence and legal
any single-family detached dwelling following
domicile. Both the principal structure and
approval of a Special Use Permit as set forth in §11-9,
accessory dwelling unit must remain in
subject to the following standards:
common ownership.
A. General Standards for Accessory Dwelling Units.
9. Accessory dwelling units must maintain a
1. A maximum of one (1) accessory dwelling complementary exterior finish to the principal
unit is permitted on an individual lot. structure.
2. Accessory dwelling units shall be within 10. Exterior lighting shall meet the standards
or substantially attached to the principal listed in § 7-5 of this Ordinance.
structure that satisfy the minimum B. The Special Use Permit for an accessory dwelling
dimensional standards listed in Part 5 as unit shall be valid for a period not exceeding two
amended. years. Thereafter the Code Enforcement Officer,
3. Accessory dwelling units shall be a minimum with concurrence from the Zoning Enforcement
of 500 sq. ft and the accessory dwelling unit Officer, may renew a Special Use Permit upon
shall not exceed 49% of the gross floor area satisfactory proof of compliance with the
of the principal dwelling up to 900 sq. ft., standards listed above and any conditions placed
whichever is less restrictive. by the Planning and Development Board on the
original permit.
4. The maximum height of an accessory
dwelling unit is limited to the maximum
height of the principal structure in the
respective zoning district.
Page 97
74 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
1. A Special Use Permit renewal shall be valid
for a period not exceeding two years.
§8-5 ADULT USES
A. Purpose. The nature of adult uses is such that
2. The original Special Use Permit or
they are recognized as having adverse secondary
any subsequent renewal by the Code
characteristics, particularly when they are
Enforcement Officer shall not be transferable.
accessible to minors and located near residential
A new property owner shall seek approval
property or related residential uses such as
from the Zoning Board of Appeals.
schools, day-care centers, libraries or parks.
3. The Code Enforcement Officer may deny the Furthermore, the concentration of adult uses has
renewal of a Special Use Permit based on the an adverse effect upon the use and enjoyment of
following: adjacent areas. The nature of adult uses requires
a. Failure to comply with NYS Building Code that they not be allowed within certain zoning
for property maintenance. districts, or within minimum distances from each
other or residential uses. Special regulation
b. Falsification of a certification of legal
of adult uses is necessary to ensure that the
residence.
adverse secondary effects would not contribute
4. If a Special Use Permit renewal is denied, the to or enhance criminal activity in the area of
property owner must seek a new Special Use such uses, nor will it contribute to the blighting
Permit approval from the Zoning Board of or downgrading of the surrounding property and
Appeals pursuant to §11-9 of this Ordinance. lessening of its value. [Amended 7-2-2007]
§8-4 ACCESSORY B. Requirements. [Amended 7-2-2007]
STRUCTURES 1. General. Adult uses, as defined in this
chapter, shall be subject to the following
A. In any district, the distance between a principal
general provisions:
building and an accessory building shall be a
minimum of ten (10) feet. a. Activities classified as obscene, as
defined by Minnesota Statutes 617.241, are
1. Accessory Dwelling Units as defined in this not permitted and are prohibited.
chapter, are required to be substantially
b. Adult uses, either principal or accessory,
attached to the principal structure.
shall be prohibited from locating in
B. All accessory structures shall be located in the any building which is also utilized for
side or rear yard. residential purposes.
C. Accessory structures shall not exceed the lot c. Adult uses, either principal or accessory,
coverage of the principal structure. shall be prohibited from locating in any
D. Accessory structures shall have a maximum place which is also used to dispense or
height that is equal to the height of the principal consume alcoholic beverages.
structure or 20 feet, whichever is more restrictive. d. An adult use which does not qualify as an
accessory use shall be classified as an
adult use-principal.
Page 98
PART 8 General Development Standards 75 OF 148
2. Adult uses-principal. ii. Shall comply with the size and
a. Adult uses both principal and accessory, number requirements for the district
shall be permitted in the Enterprise in which they are located.
District and only upon site plan approval. e. Adult use-principal activities shall be
b. Adult uses-principal shall be located at prohibited at any public show, movie,
least 1,000 radial feet as measured in a caravan, circus, carnival, theatrical,
straight line from the closest point of the or other performance or exhibition
property line of the building upon which presented to the general public where
the adult use-principal is located to the minors are permitted.
property line of: 3. Adult uses-accessory.
i. Residentially zoned property. a. Adult uses-accessory shall:
ii. A licensed day-care center. i. Comprise no more than 10% of the
ii. A public or private education facility floor area of the establishment in
classified as elementary, junior high which it is located.
or senior high. ii. Comprise no more than 20% of the
iv. A public library. gross receipts of the entire business
v. A public park. operation.
vi. Another adult use-principal. iii. Not involve or include any activity
except the sale or rental of
vii. An on-site liquor retail sales merchandise.
establishment.
b. Adult uses-accessory shall be restricted
viii. An historic or scenic resource;
from and prohibit access to minors by the
historic route or highway; or a civic or
physical separation of such items from
cultural facility.
areas of general public access.
c. Adult uses-principal shall be located at
i. Movie rentals. Display areas shall be
least 500 radial feet, as measured in a
restricted from general view and shall
straight line, from one another.
be located within a separate room,
d. Adult use-principal activities, as defined the access of which is in clear view
by this chapter, shall be classified as one and under the control of the persons
use. No two adult uses-principal shall responsible for the operation.
be located in the same building or upon
ii. Magazines. Publications classified
the same property, and each use shall
or qualifying as adult uses shall not
be subject to Subsection B(1)(b) and (c),
be accessible to minors and shall
above.
be covered with a wrapper or other
e. Adult uses-principal shall adhere to the means to prevent display of any
following signing regulations: material other than the publication
i. Sign messages shall be generic in title.
nature and shall only identify the iii. Other use. Adult uses-accessory
type of business which is being not specifically cited shall comply
conducted; and with the intent of this section
ii. Shall not contain material classified subject to the approval of the Zoning
as advertising; and Enforcement Officer.
Page 99
76 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
c. Adult uses-accessory shall be prohibited 2. Display vehicles shall be arranged in an
from both internal and external orderly fashion and provide reasonable room
advertising and signing of adult materials for pedestrian and vehicular maneuvering.
and products. 3. No vehicle storage, display or parking shall
d. Adult use-accessory activities shall be be permitted within the required front
prohibited at any public show, movie, setback.
caravan, circus, carnival, theatrical 4. Overhead doors shall not face a residential
or other performance or exhibition district and doors must remain closed except
presented to the general public where for the entry and exit of vehicles.
minors are permitted.
C. All building openings, including doors and §8-8 CANNABIS FACILITIES
windows, shall be coated, covered or screened
All cannabis facilities and uses shall conform to the
in such a manner as to prevent a view into the
requirements of City of Lackawanna Code Chapter
establishment from any public street, sidewalk or
93: Cannabis.
parking area.
D. No loudspeakers or sound equipment shall be §8-9 CEMETERIES
used by adult uses that can be heard by the
public outside the establishment. A. Any cemetery must be a contiguous parcel of
land containing at least 20 acres.
§8-6 ANIMAL SERVICE B. Mausoleums shall be located at least 200 feet
FACILITIES from any adjoining residential parcel.
A. All animals shall be retained within a wholly
enclosed building during the hours of 6:00 p.m.
§8-10 HOME OCCUPATIONS
and 8:00 a.m. Following the issuance of a Special Use Permit
B. All outdoor animal exercise areas or runs shall be in accordance with §11-9 of this Chapter, a home
fully enclosed within a fenced area that meets the occupation may be established. Upon demonstration
requirements of §7-4-6 of this Zoning Ordinance. of continued compliance with the conditions of the
original approval, the Code Enforcement Officer
C. All outdoor animal exercise areas or runs shall be
shall annually renew the special use permit. Based
located a minimum of 25 feet from all property
on compliance with applicable building codes and
boundaries.
this chapter, the Special Use Permit may be revoked
by the Code Enforcement Officer. An application for
§8-7 AUTOMOTIVE SERVICE a new special use permit shall be submitted to the
FACILITIES Zoning Board of Appeals. The Code Enforcement
A. An automotive service facility is permitted in Officer may inspect the premises without prior notice
accordance with the district use tables in §4-1, during normal business hours. Such home occupation
subject to the following standards. shall meet the following standards
1. Wheel stops or other permanent barriers A. There shall be no change in the exterior of
shall be installed to prevent vehicles from the building or other evidence that a home
encroaching on required setbacks or occupation is being conducted within.
landscaping. B. All activities involving outside visitors, clients or
deliveries shall be limited to the hours between 8
A.M. and 9 P.M.
Page 100
PART 8 General Development Standards 77 OF 148
C. No parking spaces, other than driveways, may be D. Manufactured Homes shall be set back at least
located in the required front yard. 100 feet from public streets, roadways and other
D. A home occupation shall not be permitted within property lines; and
an Accessory Dwelling Unit. E. The maximum allowable density shall not exceed
E. No more than one unlighted sign not more than 12 units/gross acre.
two square feet in size, identifying the resident
and the business, attached flat against the §8-13 NEIGHBORHOOD
building, shall be permitted. GARDEN
F. One (1) sign shall be permitted with a maximum A Neighborhood Garden is permitted in accordance
of two (2) square feet in area. The sign shall be with the use schedule in §4-1, subject to the following
located on the premises conducting the home standards:
occupation.
A. Garden areas shall be setback a minimum of 10
G. The following uses are prohibited from being
feet from all property lines.
established as home occupations:
B. The garden area must be fully enclosed by a
1. Automotive Service Facilities fence that meets the standards listed in §7-4-6
2. Restaurants/Taverns Fences.
3. 3Sale of Firearms and/or weapons 1. Fences shall not be opaque.
4. Uses which require the boarding, training, C. All materials and equipment shall be stored in a
raising or treatment of dogs, cats, or other fully enclosed structure when not in use.
animals on site
D. Site lighting shall not be permitted.
5. Food handling and/or processing/ catering
E. Accessory structures are permitted and are
§8-11 MANUFACTURED subject to the dimensional standards set forth
within the district in which the garden is located.
HOMES
A Manufactured Home shall not be parked and/ §8-14 COMMUNITY SCALE
or occupied in any district outside of an approved AGRICULTURE
Manufactured Home Park for more than 48 hours.
Community Scale Agriculture is permitted in
§8-12 MANUFACTURED HOME accordance with the use schedule in §4-1, subject to
site plan review and the following standards:
PARKS
A. Garden areas shall be setback a minimum of 20
Manufactured Home parks shall be allowed in the R-3 feet from all property lines.
zoning district subject to site plan approval and the
B. The garden area must be fully enclosed by a
following standards:
fence that meets the standards listed in §7-4-6
A. A minimum development size of five acres; Fences.
B. A street system shall be provided which gives 1. Fences shall not be opaque.
access to all Manufactured Home spaces with an
C. All materials and equipment shall be stored in a
adequate entrance drive from the public street at
fully enclosed structure when not in use.
least 20 feet wide;
C. Manufactured Homes shall be organized so that
each unit resides on land of at least 3,000 square
feet in size with a minimum width of 40 feet and a
minimum depth of 75 feet are established.
Page 101
78 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
D. Site lighting shall not be permitted. §8-15-2 Statement of Purpose
E. Accessory structures are permitted and are
This Solar Energy Local Law is adopted to advance
subject to the dimensional standards set forth
and protect the public health, safety, and welfare of
within the district in which the garden is located.
the City of Lackawanna by creating regulations for
F. Operations shall be limited to the hours of 7am the installation and use of solar energy generating
– 7pm. systems and equipment, with the following objectives:
G. A maintenance plan is required as part of site
A. To take advantage of a safe, abundant, renewable
plan approval and at a minimum must include:
and non-polluting energy resource;
1. The location of refuse containers and B. To decrease the cost of electricity to the owners
schedule of refuse pickup. of residential and commercial properties,
2. An odor mitigation/control plan. including single-family houses;
3. A pest mitigation/control plan. C. To increase employment and business
4. Emergency contact information for the owner development in the City of Lackawanna, to the
or their representative responsible for the extent reasonably practical, by furthering the
operations of the garden. installation of Solar Energy Systems; and,
D. To mitigate the impacts of Solar Energy Systems
§8-15 SOLAR ENERGY on environmental resources such as important
SYSTEMS agricultural lands, forests, wildlife, and other
protected resources.
§8-15-1 Authority
§8-15-3 Definitions
This Solar Energy Local Law is adopted pursuant to
Sections 19 and 20 of the City Law and Section 20 Active Agricultural Land. Land used for a Farm
of the Municipal Home Rule Law of the State of New Operation in accordance with Agriculture and
York, which authorize the City of Lackawanna to Markets Law § 301 – uses of which include production
adopt land use regulations and zoning provisions that of crops, livestock, and livestock products—within the
advance and protect the health, safety, and welfare past five years.
of the community, and, in accordance with the City
Battery Energy Storage System. One or more
law of New York State, “to make provision for, so far
devices, assembled together, capable of storing
as conditions may permit, the accommodation of
energy in order to supply electrical energy at a future
Solar Energy Systems and equipment and access to
time (not to include a stand-alone 12-volt car battery
sunlight necessary therefor.”
or an electric motor vehicle).
Building-Integrated Solar Energy System. A
combination of Solar Panels and Solar Energy
Equipment integrated into any building envelope
system such as vertical facades, semitransparent
skylight systems, roofing materials, or shading
over windows, which produce electricity for onsite
consumption.
Page 102
PART 8 General Development Standards 79 OF 148
Facility Area. The cumulative land area occupied Nameplate Capacity. A solar energy system’s
during the commercial operation of the solar maximum electric power output under optimal
energy generating facility. This shall include all operating conditions. Nameplate Capacity may be
areas and equipment within the facility’s perimeter expressed in terms of Alternating Current (AC) or
boundary – including the solar energy system, Direct Current (DC).
onsite interconnection equipment, onsite electrical
Native Perennial Vegetation. Native wildflowers,
energy storage equipment, and any other associated
forbs, and grasses that serve as habitat, forage,
equipment – as well as any site improvements beyond
and migratory way stations for Pollinators and shall
the facility’s perimeter boundary such as access
not include any prohibited or regulated invasive
roads, permanent parking areas, or other permanent
species as determined by the NYS Department of
improvements. The facility area shall not include
Environmental Conservation.
site improvements established for impact mitigation
purposes, including but not limited to vegetative On-Farm Solar Energy System. A Solar Energy
buffers and landscaping features. System located on a farm which is a “farm operation”
(as defined by Article 25-AA of the Agriculture and
Farm Operation. Land and on-farm buildings,
Markets Law, which may include one or multiple
equipment, facilities, and practices which contribute
contiguous or non-contiguous parcels) in an
to the production, preparation, and marketing
agricultural district, which is designed, installed,
of crops, livestock, and livestock products as
and operated so that the anticipated annual total
a commercial enterprise (in accordance with
amounts of electrical energy generated do not exceed
Agriculture & Markets Law § 301[11]).
more than 110 percent of the anticipated annual total
Glare. The effect by reflections of light with intensity electrical energy consumed by the farm operation.
sufficient as determined in a commercially reasonable
Pollinator. Bees, birds, bats, and other insects or
manner to cause annoyance, discomfort, or loss
wildlife that pollinate flowering plants, and includes
in visual performance and visibility in any material
both wild and managed insects.
respects.
Roof-Mounted Solar Energy System. A Solar Energy
Ground-Mounted Solar Energy System. A Solar
System located on the roof of any legally permitted
Energy System which is secured to the ground via
building or structure that produces electricity for
a pole, ballast system, or other mounting system;
onsite or offsite consumption.
is detached from any other structure; and which
generates electricity for onsite oroffsite consumption. Solar Access. Space open to the sun and clear of
overhangs or shade so as to permit the use of active
Kilowatt (kW). A unit of power equal to 1,000
and/or passive Solar Energy Systems on individual
watts. The nameplate capacity of residential and
properties.
commercial solar energy systems may be described
in terms of kW. Solar Energy Equipment. Electrical material,
hardware, inverters, conduit, energy storage devices,
Megawatt (MW). A unit of power equal to 1,000
or other electrical and photovoltaic equipment
kW. The nameplate capacity of larger solar energy
associated with the production and storage of
systems may be described in terms of MW.
electricity.
Mineral Soil Groups 1-4 (MSG 1-4). Soils recognized
by the New York State (NYS) Department of
Agriculture and Markets as having the highest
value based on soil productivity and capability,
in accordance with the uniform statewide land
classification system developed for the NYS
Agricultural Assessment Program.
Page 103
80 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
Solar Energy System. The components and B. Solar Energy Systems constructed or installed
subsystems required to convert solar energy into prior to the effective date of this Local Law shall
electric energy suitable for use. The term includes, not be required to meet the requirements of this
but is not limited to, Solar Panels and Solar Energy Local Law.
Equipment. A Solar Energy System is classified as a C. Modifications to an existing Solar Energy System
Tier 1, Tier 2, Tier 3, or Tier 4 Solar Energy System as that increase the Facility Area by more than 5 %
follows. of the original Facility Area (exclusive of moving
A. Tier 1 Solar Energy Systems include the following: any fencing) shall be subject to this Local Law.
1. Roof-Mounted Solar Energy Systems. §8-15-5 General Requirements
2. Building-Integrated Solar Energy Systems. A. A Building permit shall be required for installation
3. Ground-Mounted Solar Energy Systems with of all Solar Energy Systems.
a total solar panel surface area of up to 4,000 B. Prior to the issuance of the building permit or
square feet. final approval by the Code Enforcement Officer,
B. Tier 2 Solar Energy Systems include the following: construction and/or site plan documents must
be signed and stamped by a NYS Licensed
1. Ground-Mounted Solar Energy Systems not
Professional Engineer or NYS Registered
included under Tier 1 Solar Energy Systems
Architect.
with a Facility Area of up to 8 acres in size
and which generate up to 110 % of the C. Local land use boards are encouraged
electricity consumed on the site over the to condition their approval of proposed
previous 12 months. developments on sites adjacent to Solar Energy
Systems so as to protect their access to sufficient
C. Tier 3 Solar Energy Systems include the
sunlight to remain economically feasible over
following:
time.
1. Ground-Mounted Solar Energy Systems not D. Issuance of permits and approvals by the City
included under Tier 1 or Tier 2 Solar Energy of Lackawanna Planning and Development
Systems with a Facility Area of up to 40 acres Board shall include review pursuant to the State
in size. Environmental Quality Review Act [ECL Article 8
D. Tier 4 Solar Energy Systems are Solar Energy and its implementing regulations at 6 NYCRR Part
Systems which are not included under Tier 1, Tier 617 (“SEQRA”)].
2, or Tier 3 Solar Energy Systems. E. All Solar Energy Systems shall be designed,
E. Solar Panel: A photovoltaic device capable of erected, and installed in accordance with all
collecting and converting solar energy into applicable codes, regulations, and industry
electricity. standards as referenced in the NYS Uniform Fire
Prevention and Building Code (“Uniform Code”),
§8-15-4 Applicability the NYS Energy Conservation Code (“Energy
A. The requirements of this Local Law shall apply Code”), and the City of Lackawanna Code.
to all Solar Energy Systems permitted, installed, F. For Solar Energy Systems subject to site plan
or modified in the City of Lackawanna after the review, the City of Lackawanna shall impose, and
effective date of this Local Law, excluding general may update as appropriate, a schedule of fees to
maintenance and repair. recover expenses associated with engineering,
environmental, or legal services determined to
be reasonably necessary in the processing of an
application under this law.
Page 104
PART 8 General Development Standards 81 OF 148
§8-15-6 Permitting Requirements C. Ground-Mounted Solar Energy Systems
for Tier 1 Solar Energy 1. Glare. All Solar Panels shall have anti-
Systems reflective coating(s).
2. Setbacks. Tier 1 Solar Energy Systems
All Tier 1 Solar Energy Systems shall be permitted in
shall be subject to the setback regulations
all zoning districts and shall be exempt from site plan
specified for the accessory structures
review under the local zoning code or other land use
within the underlying zoning district. All
regulation, subject to the following conditions for
Ground-Mounted Solar Energy Systems shall
each type of Solar Energy Systems:
only be installed in the side or rear yards in
A. Roof-Mounted Solar Energy Systems. residential districts.
1. Roof-Mounted Solar Energy Systems shall 3. Height. Tier 1 Solar Energy Systems shall be
incorporate, when feasible, the following subject to the height limitations specified for
design requirements (exceptions may be accessory structures within the underlying
approved by the Code Enforcement Official): zoning district.
a. Solar Panels on pitched roofs shall be 4. Lot Size. Tier 1 Solar Energy Systems shall
mounted with a maximum distance of comply with the existing lot size requirement
8 inches between the roof surface the specified for accessory structures within the
highest edge of the system. underlying zoning district.
b. Solar Panels on pitched roofs shall be 5. Lot coverage. Tier 1 Solar Energy Systems are
installed parallel to the roof surface on exempt from the lot coverage requirements
which they are mounted or attached. in the underlying zoning district.
c. Solar Panels on pitched roofs shall not 6. Screening and Visibility.
extend higher than the highest point a. All Tier 1 Solar Energy Systems shall have
of the roof surface on which they are views minimized from adjacent properties
mounted or attached. to the extent reasonably practicable.
d. Solar Panels on flat roofs shall not extend b. Solar Energy Equipment shall be located
above the top of the surrounding parapet, in a manner to reasonably avoid and/
or more than 24 inches above the flat or minimize blockage of views from
surface of the roof, whichever is higher. surrounding properties and shading of
2. Glare. All Solar Panels shall have anti- property to the north, while still providing
reflective coating(s). adequate Solar Access.
3. Height. All Roof-Mounted Solar Energy
Systems shall be subject to the maximum
height regulations specified for principal and
accessory buildings within the underlying
zoning district.
B. Building-Integrated Solar Energy Systems.
1. Building-Integrated Solar Energy Systems
shall be shown on the plans submitted
for the building permit application for the
building containing the system.
Page 105
82 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§8-15-7 Permitting Requirements 8. A one- or three-line electrical diagram
detailing the entire Solar Energy System
for Tier 2 Solar Energy layout, including the number of Solar Panels
Systems in each ground-mount array, solar collector
All Tier 2 Ground-Mounted Solar Energy Systems installation, associated components,
shall be permitted in the Enterprise district as an inverters, electrical interconnection
accessory structure and shall be subject to site plan methods, and utility meter, with all National
approval. Tier 2 Solar Energy Systems shall adhere Electrical Code compliant disconnects and
to the standards and requirements established for over current devices. The diagram should
Tier 1 Ground-Mounted Systems in Section 8-15-6, describe the location and layout of all Battery
in addition to (or in some cases amended by) the Energy Storage System components if
following requirements: applicable and should include applicable
setback and other bulk and area standards.
A. Application & Site Plan Review Requirements.
9. A preliminary equipment specification sheet
Applications for Tier 2 Solar Energy Systems,
that documents all proposed Solar Panels,
including materials for site plan review, shall
system components, mounting systems,
include the following:
racking system details, and inverters
1. Name, address, and contact information that are to be installed. A final equipment
of proposed or potential system installer specification sheet shall be submitted prior
and the owner and/or operator of the Solar to the issuance of building permit.
Energy System. Such information of the final
B. Standards. Tier 2 Systems shall adhere to the
system installer shall be submitted prior to
following standards.
the issuance of building permit.
1. Lot coverage. Tier 2 Solar Energy Systems
2. Name, address, contact information, and
are exempt from the lot coverage
signature of the project applicant, as well as
requirements in the underlying zoning
all the property owners, demonstrating their
district.
consent to the application and the use of the
property for the Solar Energy System. 2. Screening/Visibility. Tier 2 Solar Energy
Systems shall have views minimized from
3. Nameplate Capacity of the Solar Energy
adjacent properties to the extent reasonably
System (as expressed in kW or MW).
practicable using architectural features,
4. Zoning district designation for the parcel(s) earth berms, landscaping, or other screening
of land comprising the Facility Area. methods that will harmonize with the
5. Property lines and physical features, character of the property and surrounding
including roads, for the project site. area.
6. Adjacent land uses on contiguous parcels 3. Environmental Resources
within a certain radius of the site boundary. a. Tree-cutting. Removal of existing trees
7. Proposed changes to the landscape of larger than 6 inches in diameter should
the site, including site grading, vegetation be minimized to the extent possible.
clearing and planting, the removal of any b. To the extent practicable, Tier 2 Solar
large trees, access roads, exterior lighting, Energy System Owners shall utilize and
signage, fencing, landscaping, and screening maintain native perennial vegetation to
vegetation or structures. provide foraging habitat for pollinators in
all appropriate areas within the Facility
Area.
Page 106
PART 8 General Development Standards 83 OF 148
c. Use integrated pest management B. Application & Site Plan Review Requirements.
practices to refrain from/limit pesticide Applications for Tier 3 Solar Energy Systems,
use (including herbicides) for long-term including materials for site plan review, shall
operation and site maintenance. include the following:
§8-15-8 Permitting Requirements 1. Name, address, and contact information
of proposed or potential system installer
for Tier 3 Solar Energy and the owner and/or operator of the Solar
Systems Energy System. Such information of the final
All Tier 3 Solar Energy Systems are permitted through system installer shall be submitted prior to
the issuance of a Special Use Permit within the BRA the issuance of building permit.
and Enterprise zoning districts, and subject to site 2. Name, address, contact information, and
plan application requirements set forth in this Section. signature of the project applicant, as well as
all the property owners, demonstrating their
A. Applications for the installation of Tier 3 Solar
consent to the application and the use of the
Energy System shall be:
property for the Solar Energy System.
1. Reviewed by the Zoning Enforcement
3. Nameplate Capacity of the Solar Energy
Officer for completeness. Applicants shall be
System (as expressed in MW).
advised within 30 days of the completeness
of their application or any deficiencies that 4. Zoning district designation for the parcel(s)
must be addressed prior to substantive of land comprising the Facility Area.
review. 5. Property lines and physical features,
2. Subject to a public hearing to hear all including roads, for the project site.
comments for and against the application. 6. Map(s) of MSG 1-4 soils and Active
This hearing shall be in compliance with Agriculture Lands on the parcel(s)
all existing public hearing requirements comprising the Facility Area and adjacent
established under law by the City of parcels.
Lackawanna.
7. Adjacent land uses on contiguous parcels
3. Referred to the Erie County Department of within a certain radius of the site boundary.
Planning pursuant to General Municipal Law
8. Proposed changes to the landscape of
§ 239-m if required.
the site, including site grading, vegetation
4. Upon closing of the public hearing, the clearing and planting, the removal of any
Planning and Development Board shall take large trees, access roads, exterior lighting,
action on the application within 60-days signage, fencing, landscaping, and screening
of the public hearing, which can include vegetation or structures.
approval, approval with conditions, or
9. Erosion and sediment control and storm
denial. The 60-day period may be extended
water management plans prepared to NYS
upon consent by both the Planning and
Department of Environmental Conservation
Development Board and applicant.
standards, if applicable, and to such
standards as may be established by the
Planning Board.
Page 107
84 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
10. A one- or three-line electrical diagram d. The provision of a decommissioning
detailing the entire Solar Energy System security which shall adhere to the
layout, including the number of Solar Panels following requirements:
in each ground-mount array, solar collector
i. The deposit, executions, or filing
installation, associated components,
with the City Clerk of cash, bond, or
inverters, electrical interconnection
other form of security reasonably
methods, and utility meter, with all National
acceptable to the City attorney and/
Electrical Code compliant disconnects and
or engineer, shall be in an amount
over current devices. The diagram should
sufficient to ensure the good faith
describe the location and layout of all Battery
performance of the terms and
Energy Storage System components if
conditions of the permit issued
applicable and should include applicable
pursuant hereto and to provide for
setback and other bulk and area standards.
the removal and restorations of the
11. A preliminary equipment specification sheet site subsequent to removal.
that documents all proposed Solar Panels,
(A) The amount of the bond or
system components, mounting systems,
security shall be 115% of the cost
racking system details, and inverters
of removal and site restoration
that are to be installed. A final equipment
for the Tier 3 Solar Energy
specification sheet shall be submitted prior
System and shall be revisited
to the issuance of building permit.
every 5 years and updated as
12. A Property Operation and Maintenance Plan needed to reflect any changes
that describes continuing site maintenance, (due to inflation or other cost
anticipated dual-use, and property upkeep, changes). The decommissioning
such as mowing and trimming. amount shall be reduced by the
13. A Decommissioning Plan signed by the amount of the estimated salvage
owner and/or operator of the Solar Energy value of the Solar Energy System.
System shall be submitted by the applicant. ii. In the event of default upon
The decommissioning plan shall address the performance of such conditions,
following: after proper notice and expiration of
a. The time required to decommission and any cure periods, the cash deposit,
remove the Solar Energy System and any bond, or security shall be forfeited to
ancillary structures. the City of Lackawanna, which shall
b. The time required to repair any damage be entitled to maintain an action
caused to the property by the installation thereon. The cash deposit, bond, or
and removal of the Solar Energy System. security shall remain in full force and
effect until restoration of the property
c. The cost of decommissioning and
as set forth in the decommissioning
removing the Solar Energy System, as
plan is completed.
well as all necessary site remediation or
restoration.
Page 108
PART 8 General Development Standards 85 OF 148
C. Special Use Permit Standards. The Planning and 5. Lighting. Lighting of the Solar Energy
Development Board may issue a special use Systems shall be limited to that minimally
permit for a Tier 3 Solar Energy System only after required for safety and operational purposes
it has found that all the following standards and and shall be reasonably shielded and
conditions have been satisfied: downcast from abutting properties.
1. Underground Requirements. All utility lines 6. Multiple lots. At the discretion of the
located outside of the Facility Area shall be Planning and Development Board, where
placed underground to the extent feasible a Tier 3 Solar Energy System’s Facility
and as permitted by the serving utility, with Area comprises multiple lots (regardless
the exception of the main service connection of ownership by an individual or multiple
at the utility company right-of-way and any participating landowners), the combined
new interconnection equipment, including lots may be treated a single lot for the
without limitation any poles, with new purposes of applying specific standards and
easements and right-of-way. requirements.
2. Vehicular Paths. Vehicular paths within the 7. Lot size. The property on which the Tier 3
Facility Area shall be designed in compliance Solar Energy System is placed shall meet
with Uniform Code requirements to ensure the lot size requirements of the underlying
emergency access, while minimizing the zoning district.
extent of impervious materials and soil 8. Setbacks. The Tier 3 Solar Energy
compaction. Systems shall have a minimum setback
3. Signage. of 100 feet from all property boundaries.
Fencing, collection lines, access roads and
a. No signage or graphic content shall be
landscaping may occur within the setback.
displayed on the Solar Energy Systems
except the manufacturer’s name, 9. Height. The Tier 3 Solar Energy Systems shall
equipment specification information, have a maximum height of 20 feet to the apex
safety information, and 24-hour of the panel at its maximum tilt.
emergency contact information. Said a. This height requirement can be waived
information shall be depicted within an by the Planning and Development
area no more than [8] square feet. Board if the panels are being raised
b. As required by National Electric Code to accommodate continued or new
(NEC), disconnect and other emergency agricultural purposes.
shutoff information shall be clearly 10. Lot coverage. Tier 3 Solar Energy
displayed on a light reflective surface. A Systems are exempt from the lot coverage
clearly visible warning sign concerning requirements in the underlying zoning
voltage shall be placed at the base district.
of all pad-mounted transformers and
11. Fencing Requirements. All mechanical
substations.
equipment, including any structure for
4. Glare. All Solar Panels shall have anti- Battery Energy Storage System components,
reflective coating(s). shall be enclosed by a 7-foot-high fence, as
required by NEC, with a self-locking gate to
prevent unauthorized access.
Page 109
86 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
12. Screening and Visibility. iv. The Planning and Development
a. Solar Energy Systems smaller than 1 acre Board may elect to waive certain
shall have views minimized from adjacent screening and landscaping
properties to the extent reasonably requirements in select locations
practicable using architectural features, based on an applicant’s
earth berms, landscaping, or other demonstration of non-impact or
screening methods that will harmonize impact mitigation on adjacent
with the character of the property and parcels.
surrounding area. 13. Environmental Resources
b. Solar Energy Systems larger than 1 acre a. Tree-cutting. Removal of existing trees
shall be required to: larger than 6 inches in diameter should
i. Conduct a visual assessment of the be minimized to the extent possible.
visual impacts of the Solar Energy b. Tier 3 Solar Energy System owners shall
System on public roadways and develop, implement, and maintain native
adjacent properties. At a minimum, vegetation to the extent practicable
a line-of-sight profile analysis shall pursuant to a vegetation management
be provided. Depending upon the plan by providing Native Perennial
scope and potential significance Vegetation and foraging habitat beneficial
of the visual impacts, additional to game birds, songbirds, and Pollinators.
impact analyses, including for To the extent practicable, when
example a digital viewshed report, establishing perennial vegetation and
may be required to submitted by the beneficial foraging habitat, the owners
applicant. shall use native plant species and seed
ii. Submit a screening & landscaping mixes and seed all appropriate areas
plan to show adequate measures to within the Facility Area. Any project which
screen through landscaping, grading, is designed to incorporate agricultural
or other means so that views of Solar or farm-related activities or uses within
Panels and Solar Energy Equipment the Facility Area may be excluded from
shall be minimized as reasonably this requirement based on the amount
practical from public roadways and of space actually occupied by the
adjacent properties to the extent agricultural use(s). This exclusion will
feasible. only be allowed based on the Planning
and Development Board determination
iii. iThe screening & landscaping plan that these lands are being used for actual
shall specify the locations, elevations, agricultural uses.
height, plant species, and/or materials
that will comprise the structures, c. Use integrated pest management
landscaping, and/or grading used to practices to refrain from/limit pesticide
screen and/or mitigate any adverse use (including herbicides) for long-term
aesthetic effects of the system, operation and site maintenance.
following the applicable rules and
standards established by the City of
Lackawanna.
Page 110
PART 8 General Development Standards 87 OF 148
D. Ownership Changes. If the owner or operator of 2. At the pre-application meeting, the Applicant
the Solar Energy System changes or the owner must provide:
of the property changes, the special use permit a. a brief description of the proposed facility
shall remain in effect, provided that the successor and its environmental setting;
owner or operator assumes in writing all of the
b. a map of the proposed facility showing
obligations of the decommissioning plan. A new
project components;
owner or operator of the Solar Energy System
shall notify the zoning enforcement officer of c. the proposed facility’s anticipated
such change in ownership or operator within 30 impacts;
days of the ownership change. d. a designated contact person with
telephone number, email address, and
§8-15-9 Permitting Requirements mailing address from whom information
for Tier 4 Solar Energy will be available going-forward basis; and,
Systems e. an anticipated application submission
All Tier 4 Solar Energy Systems are permitted through date.
the issuance of a Special Use Permit within BRA-HI
C. Special Use Permit Standards
zoning district, and are subject to the site plan
and special use permit application requirements 1. Setbacks: Tier 4 Solar Energy Systems shall
established for Tier 3 Solar Energy Systems in Section have a setback of 100 feet from all property
8-15-8, in addition to (or in some cases amended by) boundaries. Fencing, collection lines, access
the following requirements: roads and landscaping may occur within the
setback.
A. Applications for Tier 4 Solar Energy Systems
shall: §8-15-10 Safety
1. Be reviewed by the Zoning Enforcement A. Solar Energy Systems and Solar Energy
Officer for completeness. Applicants shall be Equipment shall be certified under the applicable
advised within 60 days of the completeness electrical and/or building codes as required.
of their application or any deficiencies that B. Solar Energy Systems shall be maintained
must be addressed prior to substantive in good working order and in accordance
review. with industry standards. Site access shall be
B. Pre-Application Meeting. maintained, including snow removal at a level
acceptable to the local fire department and, if
1. At least 60 days prior to the submission of
the Tier 3 Solar Energy System is located in an
an application, the Applicant shall conduct
ambulance district, the local ambulance corps.
a pre-application meeting with the City staff
to ensure all parties have clear expectations C. If a Battery Energy Storage System is included as
regarding any City requirements applicable part of the Solar Energy System, they shall meet
to the proposed Solar Energy System. A the requirements of any applicable fire prevention
written request for this purpose shall be and building code when in use and, when no
sent to the Chairperson of the City Council. longer used, shall be disposed of in accordance
Submission and review of the application with the laws and regulations of the City of
shall not be delayed based on the failure Lackawanna and any applicable federal, state, or
of the Chairperson to respond in a timely county laws or regulations.
manner to a properly filed meeting request.
Page 111
88 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
D. Where deemed necessary by the Planning and §8-15-12 Enforcement
Development Board, the Applicant shall ensure
emergency access to the Facility Area for local Any violation of this Solar Energy Law shall be subject
first responders by installing an emergency to the same enforcement requirements, including the
lock box or similar device, in a location subject civil and criminal penalties, provided for in the zoning
to approval by the City of Lackawanna Fire or land use regulations of City of Lackawanna.
Department.
§8-15-13 Severability
§8-15-11 Permit Timeframe and
The invalidity or unenforceability of any section,
Abandonment subsection, paragraph, sentence, clause, provision, or
A. The Special Use Permit and site plan approval phrase of the aforementioned sections, as declared
for a Solar Energy System shall be valid for a by the valid judgment of any court of competent
period of 36 months, provided that a building jurisdiction to be unconstitutional, shall not affect
permit is issued for construction. In the event the validity or enforceability of any other section,
construction is not completed in accordance with subsection, paragraph, sentence, clause, provision, or
the final site plan – as may have been amended phrase, which shall remain in full force and effect.
and approved – as required by the Planning
and Development Board, within 36 months, the §8-16 SHORT-TERM RENTALS
applicant may request to extend the time to
complete construction for 12 months. Approval Short Term Rentals are prohibited in the City of
of a request to extend the time to complete Lackawanna pursuant to Chapter 207 of City Code.
construction shall not be unreasonably withheld
by the City of Lackawanna. If the owner and/or §8-17 WIND ENERGY
operator fails to perform substantial construction CONSERVATION
within 48 months, the approvals shall expire. SYSTEMS (WECS)
B. Upon cessation of electricity generation of a
Solar Energy System on a continuous basis
§8-17-1 Purpose
for 12 months, the City of Lackawanna may The City of Lackawanna has determined that a
notify and instruct the owner and/or operator comprehensive local law regulating the development
of the Solar Energy System to implement the of WECS is necessary to protect the interests of the
decommissioning plan. The decommissioning City and its residents. The City adopts this article to
plan must be completed within 12 months of promote the effective and efficient use of the City's
notification. wind energy resource through WECS and to regulate
C. If the owner and/or operator fails to comply with the placement of such systems so that the public
decommissioning upon any abandonment, the health, safety and welfare will not be jeopardized and
City of Lackawanna may, at its discretion, utilize that the WECS will not have a significant adverse
the bond and/or security for the removal of the impact on the aesthetic qualities of the City.
Solar Energy System and restoration of the site in
accordance with the decommissioning plan.
Page 112
PART 8 General Development Standards 89 OF 148
§8-17-2 Definitions Wind Measurement Tower. A tower used for
the measurement of meteorological data such as
Commercial Wind Energy System. A wind energy temperature, wind speed and wind direction.
conversion system consisting of one wind turbine,
one tower and associated control or conversion §8-17-3 Applicability
electronics which has a rated capacity greater than
[Amended 3-5-2008]
250 kilowatts and a total height of more than 150 feet
and is intended to solely supply electrical power into The requirements of this article shall apply to all
a power grid for sale. wind energy facilities proposed, operated, modified,
or constructed after the effective date of this article
Noncommercial Wind Energy System. A wind
except for those which began operation shall to the
energy conversion system consisting of one wind
effective date of this article and also except for wind
turbine, one tower and associated control or
energy facilities within the Bethlehem Redevelopment
conversion electronics which has a rated capacity of
Area (BRA) where the requirements of this article
not more than 250 kilowatts and a total height of less
shall apply to all wind energy facilities proposed,
than 150 feet.
operated, modified, or constructed after the effective
Total Height or Maximum Overall Height. The date of this article unless the Planning Board has
height of the wind energy conversion system issued final approval for such wind energy facilities
measured from the ground elevation to the top of the prior to December 31, 2007.
tip of the blade in the vertical position.
§8-17-4 Permits required;
Tower. The support structure, including guyed, Allowable/Zoning Districts
monopole and lattice types, upon which a wind
turbine or other mechanical device is mounted. [Amended 10-1-2007; 3-5-2008]
A. No wind energy facilities shall be constructed,
Tower Height. The height above grade of the
reconstructed, modified, or operated in the City
uppermost fixed portion of the tower, excluding the
of Lackawanna except in compliance with this
length of any axial rotating turbine blades.
article.
Wind Energy Conversion Systems (WECS). One B. No wind energy facilities shall be constructed,
or more mechanical devices such as wind chargers, reconstructed, modified, or operated in the City
windmills or wind turbines which are designed and of Lackawanna except in Enterprise (ENT) or
used to convert wind energy into a form of useful Bethlehem Redevelopment Area (BRA), and with
energy for use on site to reduce power costs for the issuance of a special use permit approved
sale or redistribution to others. WECS include both pursuant to this article, the completion of SEQR,
commercial and noncommercial systems. and upon issuance of a building permit.
Wind Energy Facility. Any wind energy conversion C. Any future construction of wind energy facilities
system or wind measurement tower, including all shall be located in an area west of the canal but
related infrastructure, electrical lines and substations, in no event shall be closer than 2,000 feet west of
access roads and accessory structures. the westerly line of Hamburg Turnpike.
D. No wind measurement tower shall be
Wind Energy System. The equipment that converts
constructed in the City of Lackawanna except in
and then stores or transfers energy from the wind
the allowable districts pursuant to a special use
into usable forms of energy and includes any
permit and this article.
base, blade, foundation, generator, nacelle, rotor,
tower, transformer, turbine, vane, wire, substation,
maintenance or control facilities or other component
used in the system.
Page 113
90 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§8-17-5 Applications for Wind ii. Utility lines, both above and below
ground, within a radius equal to the
Energy Facilities proposed tower height, including the
[Amended 3-5-2008] blades.
A. Applications for a special use permit for WECS iii. Property lot lines and the location
will follow the general process for the issuance of and dimensions of all existing
a special use permit as described in Part 11 of the structures and uses on site within
City Code and this article, and shall be made as 1,000 feet of the wind energy
follows: conversion systems.
iv. Surrounding land use and all
1. Applicants for a special use permit for wind
structures within 1,500 feet of the
energy conversion systems within the City
wind energy conversion systems.
of Lackawanna shall submit the following
information to the City for its referral to a v. Dimensional representation of the
professional engineer or consultant and to various structural components of
the Planning Board of the City for review and the tower construction, including the
recommendation to the City Council: base and footing.
a. Name and address of the applicant. vi. Certification by a registered New
York State professional engineer that
b. Evidence that the applicant is the owner
the tower's design is sufficient to
of the property involved or has the written
withstand wind loading requirements
permission of the owner to make such an
for structures as established by the
application.
New York State Uniform Construction
c. Visual environmental assessment form Code.
(visual EAF), landscaping plan, and
vii. Existing topography.
visual assessment report, including
appropriate models and photography viii. Proposed plan for grading and
assessing the visibility from key removal of natural vegetation.
viewpoints identified in the visual EAF ix. Proposed plan for restoration after
or by the City of Lackawanna, existing construction according to City of
tree lines and proposed elevations. The Lackawanna and NYS Department
visual EAF shall include a detailed or of Environmental Conservation
photographic simulation showing the site guidelines.
fully developed with all proposed wind
x. Wind characteristics and dominant
turbines and accessory structures.
wind direction from which 50% or
d. (A SEQR full environmental assessment more of the energy contained in the
form (EAF). wind flows.
e. A site plan drawn in sufficient detail to
show the following:
i. Location of the tower(s) on the site
and the tower height, including
blades, rotor diameter and ground
clearance.
Page 114
PART 8 General Development Standards 91 OF 148
xi. Plan for ingress and egress to the g. Turbine drawings: must contain
proposed project site, including: photographs or detailed drawings of each
wind turbine model, including the tower
(A) A description of the access route
and foundation.
from the nearest state, county,
and/or City-maintained roads to h. Noise report. A noise report shall be
include: furnished which shall include the
following:
(1) Road surface material,
stating the type and amount i. A description and map of the projects
of surface cover. noise-producing features, including
(2) Width and length of access the range of noise levels expected,
route. and the tonal and frequency
characteristics expected. The noise
(3) Dust control procedures. report shall include low frequency,
(B) A road maintenance schedule or infrasound, pure tone, and repetitive/
program. impulsive sound.
(C) Review of railroad accessibility ii. A description and map of the noise-
for deliveries. sensitive environment, including
any sensitive noise receptors (i.e.,
xii. Detailed construction plan, including
residences, hospitals, libraries,
but not limited to a construction
schools, places of worship and other
schedule; hours of operation;
facilities where quiet is important)
designation of heavy haul routes; a
within two miles of the proposed
list of material equipment and loads
facilities.
to be transported; identification
of temporary facilities intended iii. A survey and report prepared by
to be constructed; and a contact a qualified engineer that analyzes
representative in the field with a the preexisting ambient noise
name and phone number. regime, including seasonal variation,
including but not limited to separate
xiii. Tree removal. All groves of trees shall
measurements of low frequency and
be located on the site plan at the time
A-weighted noise levels across a
of application. No grove or woodlots
range of wind speeds, including near
of trees shall be removed without
cut-in, turbulence measurements,
approval of the Planning Board,
distance from the turbines, location
excluding the BRA area.
of sensitive receptors relative to wind
f. Turbine information: must contain direction and analyses at affected
specific information on the type, size, sensitive receptors, located within
height, rotor material, rated power two miles of the proposed project
output, performance, safety, and noise site.
characteristics of each commercial wind
turbine model, tower, and electrical
transmission equipment.
Page 115
92 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
iv. A description and map showing the j. Ice throw calculations: a report from a
potential noise impacts, including New York State professional engineer
estimates of expected noise impacts that calculates the maximum distance
upon construction and operation that ice from the turbine blades could he
workers and estimates of expected thrown. The basis of the calculation and
noise levels at sensitive receptor all assumptions must be disclosed.
locations. k. Blade throw calculations: a report from
v. A description and map of the a New York State professional engineer
cumulative noise impacts. that calculates the maximum distance
vi. A description of the project's that pieces of the turbine blades could be
proposed noise-control features, thrown. The basis of the calculation and
including specific measures all assumptions must be disclosed.
proposed to protect workers and l. Catastrophic tower failure: a report from
specific measures proposed to the turbine manufacturer stating the wind
mitigate noise impacts for sensitive speed and conditions that the turbine
receptors consistent with levels in is designed to withstand, including all
this article. assumptions.
vii. Identification of any problem areas. m. FAA notification: a copy of written
viii. Manufacturers' noise design and field notification to the Federal Aviation
testing data, both audible dB(A) and Administration.
low frequency (deep bass vibration), n. (Utility notification: utility interconnection
for all proposed structures. data and a copy of a written notification
ix. A report that out lines issues and to the utility of the proposed
considerations for individuals that use interconnection.
hearing aids. o. (Notification to microwave
communications link operators. An
i. A geotechnical report shall be furnished
application that includes any wind turbine
which shall, at a minimum, include the
which is located within two miles of any
following:
microwave communications link shall
i. Soils engineering and engineering be accompanied by a copy of a written
geologic characteristics of the site notification to the operator of the link.
based on oil-site sampling and p. Floodplain. An application that includes
testing. any wind turbine which is located within
ii. Foundation design criteria for all a one-hundred-year floodplain area, as
proposed structures. such flood hazard areas are shown on the
iii. Slope stability analysis. floodplain maps, shall be accompanied by
a detailed report which shall address the
iv. Grading criteria for ground
potential for wind erosion, water erosion,
preparation, cuts and fills, and soil
sedimentation and flooding, and which
compaction.
shall propose mitigation measures for
such impacts.
Page 116
PART 8 General Development Standards 93 OF 148
q. Other information: such additional i. Notwithstanding the provisions set forth
information as may be reasonably in these subsections, such setbacks from
requested by the Technical Support lot lines do not apply if the application
Department, Code Enforcement Officer, is accompanied by a legally enforceable
Planning Board, or City Council. agreement for a period of 25 years or the
life of the permit, whichever is longer, that
B. Special use permits issued for wind energy
the adjacent landowner agrees to the
conversion systems shall be subject to the
elimination of the setback.
following conditions:
2. Maximum overall height. The maximum
1. Setbacks. The applicant shall adhere to the
overall height of any wind energy conversion
following setbacks:
system shall be 450 feet. The maximum
a. No commercial wind energy systems shall height shall be measured from the ground
be allowed in any residential district. elevation to the top of the tip of the blade in
b. One thousand feet from any residential the vertical position.
district boundary line. 3. Signage. No advertising sign shall be placed
c. A minimum of 1.5 times the total WECS or painted on any commercial wind energy
height from any building located outside facility.
the applicant's property line. 4. Color and finish. Wind turbines shall
d. A minimum of 1,500 feet from any be painted a nonobtrusive (e.g., light
dwelling. environmental color such as white, gray, or
beige) color that is nonreflective. The design
e. (From property lines (excluding residential
of commercial wind energy facility buildings
zones and the BRA):
and related structures shall, to the extent
i. A minimum of 1.5 times the total reasonably possible, use materials, colors,
WECS height from any property line, textures, screening and landscaping that will
excluding adjoining lot lines of project blend the facility to the natural setting and
participants. the existing environment.
f. A minimum of 1.5 times the total WECS 5. Lighting. The applicant shall submit a
height from any public road and highway. commercial wind energy facility lighting
plan that describes all lighting that will be
g. Where the lot line abuts a public right-
required, including any lighting that may be
of-way, the setbacks specified above shall
required by the FAA. Such plan shall include
be measured from the center line of such
but is not limited to the planned number and
right-of-way.
location of lights, light color, whether any
h. From aboveground transmission lines such lights will be flashing, and mitigation
greater than 12 kilovolts: measures planned to control the light so
i. A minimum of 1.5 times the total that it is does not spill over onto neighboring
WECS height from any aboveground properties.
transmission line greater than C. Compliance with regulatory agencies. The
12 kilovolts, excluding where applicant is required to obtain all necessary
transmission lines are located within regulatory approvals and permits from all
PUD Zones and those transmission federal, state, county, and local agencies
lines associated with the WECS and having jurisdiction and approval related to
in the BRA. the completion of the wind energy conversion
system.
Page 117
94 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
D. Safety and security requirements. The applicant 7. Access doors locked. All access doors to
shall adhere to the following safety and security wind turbine towers and electrical equipment
requirements: shall be lockable and shall remain locked at
all times when operator personnel are not
1. Safety shutdown. Each wind turbine shall be
present.
equipped with both manual and automatic
controls to limit the rotational speed of 8. Self-supporting structures. All wind energy
the blade within the design limits of the conversion system structures shall be of
rotor. Manual electrical and/or overspeed monopole construction (single pole). No
shutdown disconnect switches shall be lattice structures or guy-wire-supported
provided and clearly labeled on the wind structures shall be permitted.
turbine structure. No wind turbine shall be 9. Signage. Appropriate warning signage
permitted that lacks an automatic braking, shall be placed on wind turbine towers,
governing, or feathering system to prevent electrical equipment, and wind energy
uncontrolled rotation, overspeeding and facility entrances. Signage shall also include
excessive pressure on the tower structure, two twenty-four-hour emergency contact
rotor blades, and turbine components. numbers to the owner of the wind turbine
2. Grounding. All structures which may be in accordance with local, state, and federal
charged with lightning shall be grounded codes.
according to applicable electrical codes. 10. Ice throw. The permit shall determine
3. Wiring. All wiring between the wind turbines the acceptable ice throw range based
and the wind energy facility substation shall on the activities in the area, location and
be underground. The applicant is required to calculations of the ice throw.
provide a site plan showing the locations of E. Noise requirements. The applicant shall adhere to
all overhead and underground electric utility the following noise requirements:
lines, including substations for the project.
1. Compliance with noise regulations required.
4. All transmission lines from wind energy A WECS permit shall not be granted
conversion systems to oil-site substations unless the applicant demonstrates that the
shall be underground. The City Council shall proposed project complies with all noise
have the authority to waive this requirement regulations.
if the owner of the property upon which the
2. Noise study required. The applicant
transmission line will be sited consents to
shall submit a noise study based on the
aboveground transmission lines or if the
requirements set out in Subsection B of this
City Council has sufficient engineering data
section. The Planning Board and Technical
submitted by the applicant to demonstrate
Support Department shall determine
that underground transmission lines are
the adequacy of the noise study and, if
unfeasible.
necessary, may require further submissions.
5. Ground clearance. The blade tip of any The noise study shall consider the following:
wind turbine shall, at its lowest point, have a
a. Low-frequency noise.
ground clearance of not less than 50 feet.
b. Infrasound noise.
6. Climb ability. Wind turbine towers shall not
be climbable up to 15 feet above ground level. c. (Pure tone.
d. Repetitive/impulsive sound.
Page 118
PART 8 General Development Standards 95 OF 148
3. Noise setbacks. The City Council may impose G. Impact on wildlife species and habitat. The
a noise setback that exceeds the other applicant shall adhere to the following regarding
setbacks set out in this section if it deems the impact on wildlife species and habitat:
that such greater setbacks are necessary to
1. Endangered or threatened species.
protect the public health, safety and welfare
Development and operation of a WECS
of the community.
facility shall not have a significant adverse
4. Audible noise standard. The audible noise impact on endangered or threatened fish,
standard due to wind turbine operations shall wildlife, or plant species or their critical
not be created which causes the noise level habitats, or other significant habitats
at the boundary of the proposed project site identified in the City of Lackawanna
to exceed the greater of 45 dB(A) for more Comprehensive Plan and/or the studies and
than five minutes out of any one-hour time plans of the regional planning commissions
period or 6 dB(A) greater than the prevailing based on criteria established by federal or
background noise. state regulatory agencies.
5. Operations, low-frequency noise. A WECS 2. Migratory birds. Development and operation
facility shall not be operated so that of a commercial wind energy facility shall be
impulsive sound below 20 Hz adversely evaluated based on SEQRA findings.
affects the habitability or use of any dwelling
H. Unsafe and inoperable wind energy facilities; site
unit, hospital, school, library, nursing home,
reclamation. The applicant shall adhere to the
or other sensitive noise receptor.
following:
6. Noise complaint and investigation process
1. Removal and site restoration. Unsafe WECS
required. The applicant shall submit a noise
facilities, inoperable WECS facilities and
complaint and investigation process. The
WECS facilities for which the permit has
Planning Board shall determine the adequacy
expired shall be removed by the owner
of the noise complaint and investigation
at his or her expense. All safety hazards
process.
created by the installation and operation of
F. Fire hazard protection. The applicant shall the commercial wind energy facility shall be
submit a fire control and prevention program eliminated, and the site shall be restored to
that is appropriate and adequate for the its natural condition to the extent feasible as
proposed facility. The proposed program may per Subsection B(11)(b) of this section. A bond
include, but is not limited to, the following: or other appropriate form of security shall be
1. Fireproof or fire-resistant building materials. required to cover the cost of the removal and
2. Buffers or fire-retardant landscaping. site restoration at the time of building permit
application. The bond shall be payable to
3. iAvailability of water. the City of Lackawanna for the removal
4. An automatic fire-extinguishing system for of nonfunctional towers and appurtenant
all buildings or equipment enclosures of facilities in an amount to be determined by
substantial size containing control panels, the City for the period of the life of the facility.
switching equipment, or transmission Any fund established may consist of a letter
equipment without regular human of credit from a State of New York licensed
occupancy. financial institution. All costs of the financial
5. Provision of training and fire-fighting security shall be borne by the applicant.
equipment for local fire protection personnel.
Page 119
96 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
2. Removal and site restoration plan required. 6. Compliance with FAA regulations. All
The applicant shall submit a removal and commercial wind energy siting shall comply
site restoration plan and removal and site with Federal Aviation Administration (FAA)
restoration plan cost estimate to the Code regulations.
Enforcement Officer and City Council for a. Locking mechanisms to limit radar
review and approval. The restoration plan interference required. All WECS facilities
shall identify the specific properties it applies shall include a locking mechanism which
to and shall indicate removal of all buildings, prevents the blades from rotating when
structures wind turbines, access roads and/or not producing power, in order to limit
driveways and foundations to four feet below airport radar interference or "clutter." This
finish grade; road repair costs, if any: and all provision does not apply while the WECS
regrading and revegetation necessary to return is "free-wheeling" during startup and
the subject property to the condition existing shutdown. The City Council may modify
prior to establishment of the WECS facility. or eliminate the requirement for a locking
The restoration shall reflect the site-specific mechanism if sufficient evidence is
character, including topography, vegetation, presented that no significant airport radar
drainage, and any unique environmental interference or "clutter" will be caused by
features. The plan shall include a certified the WECS facility.
estimate of the total cost (by element) of
implementing the removal and site restoration I. Erosion control. The applicant shall adhere to the
plan. following:
3. Public nuisance. Every unsafe WECS facility 1. Erosion control plan required. Before the
and every inoperable WECS facility is hereby City of Lackawanna shall issue a grading
declared a public nuisance which shall be or building permit for the WECS facility, the
subject to abatement by repair, rehabilitation, applicant shall submit an erosion control
demolition, or removal. An inoperable WECS plan to the Technical Support Department for
facility shall not be considered a public review and approval. The plan shall minimize
nuisance, provided that the owner can the potential adverse impacts on wetlands
demonstrate that modernization, rebuilding or and Class I and II streams and the banks and
repairs are in progress or planned and will be vegetation along those streams and wetlands
completed within no more than six months. and to minimize erosion or sedimentation.
4. "Inoperable" defined. A commercial wind 2. If the proposed project disturbs over one
energy facility shall be deemed inoperable if it acre, the applicant must comply with the
has not generated power within the preceding New York State Department of Environmental
six months. Conversion SPDES General Permit for
Stormwater Discharges from Construction
5. Interference with residential television,
Activity (Permit No. GP-02-01). A copy of
microwave and radio reception. The
the notice of intent (N.O.I.) and stormwater
applicant must submit proof that the
pollution prevention plan (SWPPP), as
proposed construction of the wind
required by the general permit, must be
energy conversion system will not cause
filed with the City of Lackawanna prior
interference with microwave transmissions,
cellular transmissions, residential television to construction. Per the general permit,
interference or radio reception of domestic construction cannot begin until the required
time period for NYSDEC review has passed.
or foreign signals. The applicant shall include
specific measures proposed to prevent
interference, a complaint procedure, and
specific measures proposed to mitigate
interference impacts.
Page 120
PART 8 General Development Standards 97 OF 148
J. Certification. The applicant shall provide the K. Monitoring requirements for wind energy
following certifications: conversion systems.
1. Certification of structural components. 1. Right to enter premises for monitoring. Upon
The foundation, tower and compatibility of reasonable notice, City of Lackawanna
the tower with the rotor and rotor-related officials or their designated representatives
equipment shall be certified in writing by a may enter a lot on which a WECS facility
structural engineer licensed and registered permit has been granted for the purpose of
in New York. The engineer shall certify compliance with any permit requirements.
compliance with good engineering practices Twenty-four hours' advance notice by
and compliance with the appropriate telephone to the owner/operator or
provisions of the Uniform Building and designated contact person shall be deemed
Construction Code that have been adopted reasonable notice.
in New York State. 2. Avian/bat impact study plan. The applicant
2. Certification of post construction. After shall submit a plan for monitoring the avian
completion of the wind energy conversion impact of the commercial wind energy
system, the applicant shall provide a facility to the Planning Board for its review
postconstruction certification from a and approval. Such plan shall document
licensed professional engineer licensed and and follow accepted scientific study
registered in the State of New York that the procedures. In addition, the applicant shall
project complies with applicable codes and agree to submit a report to the Planning
industry practices and has been completed Board according to the requirements of the
according to the design plans. applicable regulatory agencies that identifies
3. Certification of electrical system. The all dead birds found within 500 feet of the
electrical system shall be certified in writing commercial wind energy facility.
by an electrical engineer registered in New 3. Periodic reporting required. The applicant
York. The engineer shall certify compliance shall agree to submit periodic monitoring
with good engineering practices and with the reports to the City. The report shall contain
appropriate provisions of the Electric Code data on the operations and environmental
that have been adopted by New York State. impacts and shall be in the form prescribed
4. Certification of rotor overspeed control. The by the Code Enforcement Officer.
rotor overspeed control system shall be 4. Power production report required. The
certified in writing by a mechanical engineer applicant shall agree to submit as requested
licensed and registered in New York State. by the City Council a power production
The engineer shall certify compliance with report to the City. The power production
good engineering practices. report shall include actual power production
5. Certification of project. A certificate of in kilowatt hours for each WECS facility.
completion must be supplied by the
applicant and approved by the City of
Lackawanna Code Enforcement Officer.
Page 121
98 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
5. Inspections. Unless waived by the City 2. Development fees to be paid. A one-time or
Council, wind turbines or poles over 150 periodic fee and a requirement to provide
feet in height shall be inspected annually public works or services may be imposed
by a New York State licensed professional as a condition of a commercial wind energy
engineer that has been approved by the City system permit. Such fees must be related to
or at any other time upon a determination the public need created by the wind energy
by the City's Code Enforcement Office that development. The purposes for which the
the wind turbine, tower or pole may have permit fee may be used include, but are not
sustained structural damage, and a copy of limited to, providing roads required by the
the inspection report shall be submitted to wind development, providing fire protection
the City Code Enforcement Officer. Any fee or services, and establishing and operating a
expense associated with this inspection shall monitoring system.
be borne entirely by the permit holder. 3. Proof of insurance. Prior to the issuance of a
6. General complaint process. building permit, the applicant shall provide
a. During construction, the City of the City Clerk with proof of insurance in a
Lackawanna Code Enforcement Officer sufficient dollar amount to cover potential
can issue a stop-work order at any time personal and property damage associated
for any violations of the permit. with the construction and operation thereof.
b. (Postconstruction. After construction M. Findings.
is complete, the permit holder shall 1. Findings necessary to grant a WECS facility
establish a contact person, including permit. In order to grant a WECS facility
name and phone number, for receipt of permit, the City of Lackawanna shall review
any complaint concerning any permit the application and all filings by any other
requirements. Upon receipt of a complaint party and conduct a public hearing. A
from the City of Lackawanna Code commercial wind energy facility permit
Enforcement Officer, the permit holder shall not be granted unless the City of
contact person shall have seven working Lackawanna makes the following findings
days to reply to the City in writing. based on substantial evidence:
L. Application and development fees and costs. 2. Consistent with the Comprehensive Plan. The
proposed commercial wind energy facility
1. Application fee. The applicant shall pay a fee
project is consistent with the Comprehensive
of $5,000 per wind energy system associated
Plan of the City of Lackawanna.
with the City of Lackawanna's review and
processing of the application. The applicant 3. Will not unreasonably interfere with the
shall submit a deposit with the application orderly land use and development plans.
in the amount as set forth above. Following The proposed WECS facility will not
action on the application, any unused unreasonably interfere with the orderly land
amount of the deposit(s) shall be returned to use and development plans of the City of
the applicant with a summary of the costs Lackawanna.
incurred. 4. Benefits to the applicant and public will
exceed any burdens. The benefits of the
proposed WECS facility project to the
applicant and the public will exceed any
burdens.
Page 122
PART 8 General Development Standards 99 OF 148
5. Not detrimental to the public health, safety S. The applicant shall certify to the City that
and general welfare of the community. appropriate security will be in place to restrict
The proposed WECS facility will not he access to the WECS and facilities following
detrimental to the public health, safety or completion of construction.
general welfare of the community.
6. Complies with all required provisions
§8-17-6 Wind measurement towers
of the Zoning Ordinance. The proposed [Amended 3-5-2008]
WECS facility shall comply with all required
provisions of the Zoning Ordinance, unless The City Council acknowledges that prior to
variances have been properly applied for and construction of a WECS, a wind site assessment
granted pursuant to Part 11 of this Chapter. is conducted to determine the wind speeds and
feasibility of using particular sites. Installation of wind
N. The City Council may grant the special use
measurement towers, also known as "anemometer
permit, deny the special use permit, or grant the
("met") towers," shall be permitted as a special use in
special use permit with written stated conditions.
the same zoning districts as the WECS.
Denial of the special use permit shall be by
written decision based upon substantial evidence A. An application for a wind measurement tower
submitted to the Board. Upon issuance of the shall include:
special use permit, the applicant shall obtain a
1. Name, address and telephone number of the
building permit for each tower.
applicant. If the applicant is represented by
O. WECS permits approved by the City Council an agent, the application shall include the
of the City of Lackawanna shall be renewed name, address and telephone number of the
annually. The permit holder shall make renewal agent as well as an original signature of the
application to the Supervising Building Inspector applicant authorizing the representation.
60 days prior to expiration to allow for inspection
2. Name, address and telephone number of the
and full compliance with all applicable laws and
property owner. If the property owner is not
regulations. The renewal application will include
the applicant, the application shall include
a fee as set by the City Council of no more than
a letter or other written permission signed
$500 per wind energy system.
by the property owner confirming that the
P. The special use permit shall not be assignable property owner is familiar with the proposed
or transferable without the approval of the City applications and authorizing the submission
Council. of the application.
Q. Amendments to special use permit. Any changes 3. Address of each proposed tower site,
or alterations postconstruction to the WECS shall including Tax Map section, block and lot
be done only by amendment to the special use number.
permit and subject to all requirements of this
4. Site plan.
article.
5. Decommissioning plan, including a security
R. The applicant licensee shall agree to indemnify
bond or cash for removal.
and hold the City, its City Council, officers, agents
and employees harmless from any liability B. The City Council may attach such conditions as
imposed upon the City, its officers, agents and/ it deems appropriate to variance approvals as it
or employees arising from the construction, deems necessary to minimize the impact of the
operation or maintenance of the WECS. variance.
C. The "Met" towers installed prior to February 1,
2008 shall be exempt from the requirements set
forth in this section.
Page 123
100 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§8-17-7 Permit Revocation §8-17-8 Fees and costs
A. Testing fund. A special use permit shall contain [Amended 3-5-2008]
a requirement that the application fund periodic
A. All fees required under this article shall be
noise testing by a qualified independent third-
approved by the City Council by resolution.
party acoustical measurement consultant, which
Nothing in this article shall he read as limiting the
may be required as often as every two years or
ability of the City to enter into host community
more frequently upon request of the City Council
agreements with any applicant to compensate
in response to complaints by residents. The
the City for expenses or impacts on the
scope of the noise testing shall be to demonstrate
community. The City shall require any applicant
compliance with the terms and conditions of the
to enter into an escrow agreement to pay the
special use permit and this article and shall also
engineering and legal costs of any application
include an evaluation of any complaints received
review, including the review required by SEQRA.
by the City. The applicant shall have 90 days after
written notice from the City Council to cure any
§8-17-9 Enforcement; Penalties for
deficiency. An extension of the ninety-day period
may be considered by the City Council, but the
Offenses; Remedies
total period may not exceed 180 days. A. Any person owning, controlling or managing any
B. Operation. A WECS shall be maintained in building, structure or land who shall undertake
operational condition at all times, subject to a WECS or wind measurement tower in violation
reasonable maintenance and repair outages. of this article or in noncompliance with the terms
Operational condition includes meeting all noise and conditions of any permit issued pursuant to
requirements and other permit conditions. Should this article or any order of the enforcement officer
a WECS become inoperable, or should any part of and any person who shall assist in so doing shall
the WECS be damaged, or should a WECS violate be guilty of an offense and subjected to a fine
permit conditions, the owner or operator shall of not more than $250 or to imprisonment for a
remedy the situation within 90 days after written period of not more than six months, or both. Every
notice from the City Council. The applicant shall such person shall be deemed guilty of a separate
have 90 days after written notice from the City offense for each week such violation shall
Council to cure any deficiency. An extension of continue. The City may institute a civil proceeding
the ninety-day period may be considered by the to collect civil penalties in the amount of $250
City Council, but the total period may not exceed for each violation, and each week said violation
180 days. continues shall be deemed a separate violation.
C. Notwithstanding any other abatement provision B. In case of any violation or threatened violation
under this article, if the WECS is not repaired of any of the provisions of this article, including
or made operational or brought into permit the terms and conditions imposed by any permit
compliance after said notice, the City may, after issued pursuant to this article, in addition to
a public hearing at which the operator or owner other remedies and penalties herein provided,
shall be given opportunity to be heard and the City may institute any appropriate action or
present evidence, including a plan to come into proceeding to prevent such unlawful erection,
compliance, either order remedial action within structural alteration, reconstruction, moving and/
a particular timeframe or order revocation of the or use, and to restrain, correct or abate such
wind energy permit or the WECS and require the violation to prevent the illegal act.
removal of the WECS within 90 days. If the WECS
is not removed, the City Council shall have the
right to use the security posted as part of the
decommission plan to remove the WECS.
Page 124
PART 9 Non-Conforming Uses, Lots, and Structures 101 OF 148
PART 9
NON-CONFORMING USES, LOTS, AND STRUCTURES
§9-1 PURPOSE B. Change in use. A nonconforming use may only
be changed to a conforming use. A conforming
Within the districts established by this Chapter use may not thereafter be changed back to any
or amendments that may be adopted, there exist nonconforming use.
lots, structures, uses of land and characteristics
C. Discontinuance of a Nonconforming Use.
of use that were lawful before this Chapter or
amendments thereto were passed, but that would 1. When a nonconforming use has been
be prohibited, regulated or restricted under terms discontinued for a period of at least six
of this Chapter or future amendments. Regulations consecutive months, the use shall not
for the continuance, maintenance, repair, restoring, thereafter be reestablished, and the future
moving and discontinuance of such nonconforming use shall be in conformance with the
lots, structures, land and uses are established for the provisions of this chapter.
following purposes: 2. Discontinuance of the active and
A. To permit these nonconformities to continue, but continuous operation of a nonconforming
to minimize any adverse effect on the adjoining use, a part or portion of the operation of
properties and development; the nonconforming use, for a period of
12 consecutive months is construed and
B. To regulate their maintenance and repair;
considered to be an abandonment of such
C. To restrict their rebuilding if substantially nonconforming use, regardless of any
destroyed; reservation of an intent not to abandon same
D. To require their permanent discontinuance if not or of an intent to resume active operations.
operated for certain periods of time; and 3. If actual abandonment in fact is evidenced
E. To require conformity if they are discontinued, to by the removal of buildings, structures,
bring about eventual conformity in accordance machinery, equipment and other evidences
with the objectives of the Comprehensive Plan of such nonconforming use of the land and
and Zoning Chapter of the City of Lackawanna. premises, then the abandonment shall be
construed and considered to be completed
§9-2 NONCONFORMING within a period of less than six months, and
USES all rights to reestablish or continue such
nonconforming use shall terminate.
A. Continuation of existing use. Except as provided
in this article, any use of land, building, structure
or part thereof existing at the time that this
chapter or any amendment hereto becomes
effective may be continued after the passage of
this chapter, provided that the use and character
of the premises at the time of the enactment of
this chapter remains unchanged.
Page 125
102 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§9-3 NONCONFORMING 2. In any commercial or industrial district, any
nonconforming use may be enlarged to
STRUCTURES an extent not exceeding 25% of the gross
A. When a nonconforming structure is damaged floor area devoted to such nonconforming
or destroyed to the extent of 50% or more of its use. In no case shall such enlargement
replacement value, the structure may be repaired extend beyond the lot occupied by such
or rebuilt only if it conforms to the provisions of nonconforming use.
this Ordinance. 3. When the total of all enlargements equals
B. When a nonconforming structure is damaged or 25% of the gross floor area existing at the
destroyed to the extent of less than 50% of its time such use became a nonconforming use,
replacement value, it may be repaired and rebuilt no further enlargement shall be permitted.
to its previous condition, so long as the cause of
damage was not by any means within the control §9-4 NONCONFORMING LOTS
of the owner, the nonconformity is not expanded,
A. In any R-1, R-2 or R-3 district in which single-
and no new nonconformity is created.
family detached dwellings are permitted, a
C. A building permit for repairs or reconstruction single-family detached dwelling and customary
must be granted within one year of the date of accessory structures may be erected on any
damage or destruction, unless an additional one single nonconforming lot of record at the effective
year extension is granted by the Zoning Board of date of adoption or amendment of this Chapter,
Appeals. notwithstanding limitations imposed by other
D. The replacement value of the structure is based provisions of this Chapter. Such lot shall be
on: in separate ownership and not of continuous
frontage with other lots in the same ownership.
1. the sale of that structure within the previous
B. This provision shall apply even though the
year or, if that is not available;
nonconforming lot of record fails to meet the
2. an appraisal within the last two years or, if requirements for area or width, or both, that are
that is not available; generally applicable in the district, provided that
3. the amount for which the structure was yard dimensions and requirements other than
insured prior to the date of the damage or these applying to area or width, or both, of the
destruction or, if that is not available; d) an nonconforming lot of record shall conform to the
alternative method determined acceptable by regulations for the district in which such lot is
the Zoning Administrator; and, located. Variance of yard requirements shall be
obtained only through action of the Zoning Board
4. In the event that a building permit is not
of Appeals.
obtained within one year of the date of
damage or destruction, and no extension C. If two or more lots or combinations of lots or
has been applied for, the structure may be portions of lots with continuous frontage in single
repaired or rebuilt only if it conforms to the ownership are of record at the time of passage
provisions of this Ordinance. or amendment of this Chapter, and if all or part of
the lots do not meet the requirements established
E. Extensions and Enlargements.
for width and area, the lands involved shall be
1. Nonconforming structures may be enlarged considered an undivided parcel for the purposes
or extended, provided that the enlargement of this Chapter. The provisions of this Section
does not increase the degree of the existing shall not apply if any portion of said parcel shall,
nonconformity, and the enlargement after the adoption of this Chapter or amendment,
or extension does not create a new be used or divided in a manner which prevents
nonconformity. or diminishes compliance with the requirements
established by this Chapter or amendment
thereto.
Page 126
PART 9 Non-Conforming Uses, Lots, and Structures 103 OF 148
§9-5 NONCONFORMING §9-6 REPAIRS AND
PARKING, LOADING, MAINTENANCE
AND STACKING A. Normal maintenance, including nonstructural
FACILITIES repairs and incidental alterations of a building or
A. A structure, use or occupancy existing lawfully at structure containing a nonconforming use shall
the time this Chapter or any amendment thereto be permitted.
becomes effective, but which does not conform B. No structural alterations shall be made in
with the off-street parking, loading and stacking a building or other structure containing a
regulations, may be occupied or continued nonconforming use except:
without such parking and/or loading spaces
1. When required by law.
being provided.
2. To restore to a safe condition any building
B. Any such spaces that may be provided thereafter
or structure declared unsafe by the Building
shall comply with the regulations of this Chapter.
Inspector.
C. If an existing structure, use or occupancy is
3. To permit enlargements as provided in this
altered so that there is an increase of the number
article.
of dwelling units, seating capacity or floor area,
or if the use or occupancy is changed to one
requiring more off-street facilities, then off-street
parking, stacking and loading spaces shall be
provided at least equal to the number required
for the increased area for the structure or use in
accordance with all provisions of this Chapter.
Page 127
This Space Left Intentionally Blank
Page 128
PART 10 Administration 105 OF 148
PART 10
ADMINISTRATION
§10-1 ZONING OFFICER 2. Final Authority. The Zoning Officer shall be
responsible for final action regarding the
A. The Department of Development, through such
following:
division or divisions as may be established
pursuant to the City Charter shall have and a. Interpretation of district boundaries;
exercise the functions of a Zoning Officer under b. Written interpretation of this Ordinance;
the City Zoning Chapter. c. Determination of similar uses.
B. Delegation of Authority. The Director of d. Approval of zoning permits
Development for the City of Lackawanna shall act
as the Zoning Office and may designate any staff 3. General Authority:
member or representative of the City to represent a. The Zoning Officer may exercise
the Zoning Officer in any function assigned in additional powers as may be described
this Article. The Zoning Officer shall remain elsewhere in this Ordinance and as
responsible for any final action taken. permitted by NYS General City Law.
C. Powers and Duties: The Zoning Officer shall have b. The Zoning Officer shall perform related
the following powers and duties: duties as directed by the City Council.
1. Review Authority: The Zoning Officer shall be c. Coordinate overall inspection of site
responsible for reviewing the following: improvements with the Code Enforcement
a. Amendments to the zoning map Officer, Planning and Development
(rezoning) Board and other appropriate officials and
agencies;
b. Amendments to the text of the zoning
ordinance d. Maintain the Special Zoning Orders Book
as required by Chapter 75, §75-24 of this
c. cApplications for review of an Open Area Municipal Code.
Development pursuant to NYS General
City Law §36 4. Enforcement:
d. Site plan applications a. This Ordinance shall be administered by
the Zoning Officer. The Zoning Officer
e. Variance requests
shall notify the Code Enforcement Officer
f. Applications for administrative appeal when it has been determined that a
g. Applications for special use permits violation of this Ordinance may exist.
h. Applications for temporary use permits
i. Make recommendations to the Planning
and Development Board, Zoning Board
of Appeals and City Council as may be
appropriate or requested;
Page 129
106 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§10-2 PLANNING AND C. Membership, operation and appropriations.
DEVELOPMENT BOARD 1. No municipal officer or employee shall be
appointed to the Planning and Development
A. Establishment. A seven-member Planning and
Board in the event that such officer or
Development Board has been established by §
employee cannot carry out the duties of
8.3 of the City Charter.
his or her position without a conflict in
B. Duties. The Planning and Development Board the performance of his or her duties as a
shall have the following powers and duties: member of the Planning and Development.
1. Review Authority: 2. The Planning and Development Board
shall annually elect a Chairman from its
a. Amendments to the Comprehensive Plan
own members to serve for one year or the
for the City of Lackawanna;
remaining term of office, whichever is greater.
b. Amendments to the text of this ordinance
3. All meetings of the Planning and
c. Amendments to the zoning map; and, Development Board shall be held at the call
d. Recommendations regarding planning of the Chairperson and at such times as such
and development matters, upon its own Board may determine. Such Chairperson, or
initiative or referral by the City Council in his or her absence, the Acting Chairperson,
or Zoning Board of Appeals, provided may administer oaths and compel the
such expenditures do not exceed attendance of witnesses.
appropriations. 4. All Planning and Development Board
2. Final Authority. The Planning and members are required to attend each and
Development Board shall be responsible for every Planning and Development Board
final action regarding the following: meeting. A member may only be excused
from a scheduled meeting for reasons
a. Applications for site plan approval.
of health or welfare; the excusal must be
b. Applications for special use permits. arranged and approved by the Chairman of
c. Applications for temporary use permits. the Board. A maximum of three absences
and/or excuses shall be allowed within a
3. General Authority.
one-year period.
a. The Planning Board may exercise
additional powers as directed by the
City Council and as may be described
elsewhere in this Ordinance and as
permitted by NYS General City Law.
Page 130
PART 10 Administration 107 OF 148
5. All members are required to attend the
scheduled meeting prepared to conduct
§10-3 ZONING BOARD OF
the business on the agenda. Members shall
APPEALS
review agenda items, visit each location on A. Establishment. A Zoning Board of Appeals is
the agenda and discuss questions about hereby established in accordance with §81 and
proposed items with the Zoning Officer prior §81-a of the General City Law of New York.
to the scheduled meeting.
B. Powers and duties. The Zoning Board of Appeals
6. Each member of the Planning and shall have the following powers and duties
Development Board shall attend training
1. Final Authority: The ZBA shall be responsible
within six months of appointment and
for final action regarding the following:
attend refreshment course training annually.
Training shall be scheduled as courses a. Applications for variances;
become available through the Erie County b. Administrative appeals;
Department of Planning and Environment or
New York State Department of State or other I. Upon appeal of a decision from the
Board-approved venues. Zoning Enforcement Officer, the
Zoning Board of Appeals shall decide
7. The Mayor shall have the power to remove, any question involving interpretation
after public hearing, any member of the of any portions of this chapter. Such
Planning and Development Board for cause. appeal shall be initiated within 60
Any Planning and Development Board calendar days of the adverse decision
member may be disciplined or removed for
noncompliance with the above minimum c. Amendments to restrictions enacted by
requirements regarding meeting attendance the ZBA.
and training. 2. General Authority.
8. The City Council shall provide an a. The ZBA may exercise additional powers
appropriation to the Planning and as directed by the City Council and as
Development Board to cover necessary may be described elsewhere in this
expenses, including the means for the Ordinance and as permitted by law.
Planning and Development Board to maintain
a written record of its meetings and public C. Membership.
hearings. 1. The terms of the initial appointees shall be
for one, two and three years from and after
the date of appointment, so as to provide for
an equal number of appointees each year.
Succeeding appointees shall be appointed
for a term of three years. The alternate shall
serve a term of one year.
2. Members of the Zoning Board of Appeals
on the effective date of this chapter shall
continue in office until the expiration of their
present terms.
Page 131
108 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
3. If a vacancy shall occur otherwise than by D. Operation.
expiration of term, the Mayor shall appoint
1. The Zoning Board of Appeals shall conduct
the new member for the unexpired term.
its annual organization meeting at the regular
4. No person who is a member of the City meeting in January of each year. A Chairman,
Council shall be eligible for membership on Vice Chairman and Secretary shall be
the Zoning Board of Appeals; no municipal elected at this meeting.
officer or employee shall be appointed to the
2. All Zoning Board of Appeals members are
Zoning Board of Appeals in the event that
required to attend each and every Zoning
such officer or employee cannot carry out the
Board of Appeals meeting. A member may
duties of his or her position without a conflict
only be excused from a scheduled meeting
in the performance of his or her duties as a
for reasons of health or welfare; the excusal
member of the Zoning Board of Appeals.
must be arranged and approved by the
5. The City Clerk shall serve as the Clerk of Chairman of the Board. A maximum of three
the Zoning Board of Appeals and shall absences and/or excuses shall be allowed
perform such duties as required by it. The within a one-year period.
City Council shall provide a Secretary for the
3. All members are required to attend the
Board who shall work under the supervision
scheduled meeting prepared to conduct
of the City Clerk. The City Clerk shall be
the business on the agenda. Members shall
responsible for keeping a factual record,
review agenda items, visit each location on
including minutes, of all of the Board's
the agenda and discuss questions about
proceedings showing the vote of each
proposed items with the Zoning Officer prior
member upon every question, or if absent or
to the scheduled meeting.
failing to vote, indicating such a fact.
4. Each member of the Zoning Board of Appeals
shall attend training within six months of
appointment and attend refreshment course
training annually. Training shall be scheduled
as courses become available through the
Erie County Department of Planning and
Environment, New York State Department of
State or other Board-approved venue.
Page 132
PART 10 Administration 109 OF 148
5. The Mayor shall have the power to remove, E. Meetings. All meetings of the Zoning Board of
after public hearing, any member of the Appeals shall be held at the call of the Chairman
Zoning Board of Appeals for cause. Any and at such times as the Zoning Board of Appeals
Zoning Board of Appeals member may be may determine and shall be conducted under the
disciplined or removed for noncompliance following authority and requirements:
with the above minimum requirements
1. The presence of a majority of Board
regarding meeting attendance and training.
members shall constitute a quorum for the
6. The Zoning Board of Appeals may adopt conduct of business before the Zoning Board
rules or bylaws for the conduct of its own of Appeals, including the application for any
business consistent with statute and this variance.
chapter.
2. All votes of the Board shall be taken by roll
7. The City Council shall provide an call.
appropriation to the Zoning Board of Appeals
3. In accordance with General Municipal Law
to cover necessary expenses, including any
§ 809, a member of the Zoning Board of
compensation for appointed members of the
Appeals having a conflict of interest shall
Zoning Board of Appeals and provisions for
abstain from any discussion or voting on that
maintaining a written record of its meetings
matter.
and public hearings.
4. The concurring vote of a majority of the
Board shall be necessary to:
a. Make a decision:
i. Reverse any order, decision or
determination of any administrative
official of the City charged with
enforcement of the provisions of this
chapter; or
ii. Effect any variation of this chapter.
Page 133
110 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
5. Every decision of the Zoning Board of 9. The City Clerk shall make and file in its
Appeals shall be by written resolution, each office a factual record of all Zoning Board
of which shall contain a full record of the of Appeals proceedings, including keeping
findings of the Zoning Board of Appeals in minutes, the reading of the case, public
the particular case. hearing, deliberation, voting and decisions
6. All meetings of the Zoning Board of Appeals of the Zoning Board of Appeals. The minutes
shall be open to the public, and all decisions of each meeting shall contain a statement of
shall be voted upon at public sessions. findings for each decision and shall record
the vote of each member upon each question
7. The Zoning Board of Appeals may request or if absent of failing to vote, indicating such
and obtain advice or opinions on the law fact.
relating to any matter before the Zoning
Board of Appeals from the City Attorney 10. The Chairman of the Zoning Board of
and may require the City Attorney to attend Appeals, or in his or her absence the Acting
its meetings. The Zoning Board of Appeals Chairman, may administer oaths to compel
may require the Zoning Officer to attend its the attendance of witnesses in the manner
meetings to present any facts relating to any and to the extent permitted by the New York
matter before the Zoning Board of Appeals. General City Law and the Civil Practice Law
and Rules.
8. The Zoning Board of Appeals shall have
the power to subpoena and require the
attendance of witnesses, administer oaths,
compel testimony and the production of
books, papers, files and other evidence
pertinent to the matters before it.
Page 134
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 111 OF 148
PART 11
PERMIT AND SITE PLAN PROCEDURES;
ENFORCEMENT AND PENALTIES
§11-1 ADMINISTRATIVE b. Require that uses vulnerable to floods,
STANDARDS including facilities which serve such uses,
be protected against flood damage at the
Whenever in the course of the administration and time of initial construction;
enforcement of this chapter it is necessary or
c. Control the alteration of natural
desirable to make any administrative decision, then,
floodplains, stream channels, and natural
unless other standards are in this chapter provided,
protective barriers which are involved in
the decision shall be made so that the result will not
the accommodation of floodwaters;
be contrary to the spirit and purpose of this chapter or
injurious to the surrounding neighborhood. d. Control filling, grading, dredging and
other development which may increase
§11-2 FLOOD DEVELOPMENT erosion or flood damages;
PERMITS. e. Regulate the construction of flood barriers
which will unnaturally divert floodwaters
[Amended 2-5-2008; 6-19-2018; 4-29-2019] or which may increase flood hazards to
A. Statutory authorization and purpose. other lands; and
f. Qualify for and maintain participation in
1. Findings. The City Council of the City of
the National Flood Insurance Program.
Lackawanna finds that the potential and/or
actual damages from flooding and erosion 3. Objectives. The objectives of this section are:
may be a problem to the residents of the City a. To protect human life and health;
of Lackawanna and that such damages may
b. To minimize expenditure of public money
include: destruction or loss of private and
for costly flood control projects;
public housing, damage to public facilities,
both publicly and privately owned, and injury c. To minimize the need for rescue and
to and loss of human life. In order to minimize relief efforts associated with flooding and
the threat of such damages and to achieve generally undertaken at the expense of
the purposes and objectives hereinafter set the general public;
forth, this section is adopted. d. To minimize prolonged business
2. Statement of purpose. It is the purpose of this interruptions;
section to promote the public health, safety, e. To minimize damage to public facilities
and general welfare, and to minimize public and utilities such as water and gas mains,
and private losses due to flood conditions in electric, telephone, sewer lines, streets
specific areas by provisions designed to: and bridges located in areas of special
a. Regulate uses which are dangerous to flood hazard;
health, safety and property due to water f. To help maintain a stable tax base
or erosion hazards, or which result in by providing for the sound use and
damaging increases in erosion or in flood development of areas of special flood
heights or velocities; hazard so as to minimize future flood
blight areas;
Page 135
112 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
g. To provide that developers are notified Base Flood. The flood having a one-percent chance
that property is in an area of special flood of being equaled or exceeded in any given year.
hazard; and
Basement. That portion of a building having its floor
h. To ensure that those who occupy the subgrade (below ground level) on all sides.
areas of special flood hazard assume
responsibility for their actions. Breakaway Wall. A wall that is not part of the
structural support of the building and is intended
B. Definitions. Unless specifically defined below,
through its design and construction to collapse
words or phrases used in this section shall be
under specific lateral loading forces without causing
interpreted so as to give them the meaning they
damage to the elevated portion of the building or the
have in common usage and to give this section
supporting foundation system.
its most reasonable application.
Building. See "structure."
100-Year Flood. Has the same meaning as "base
flood." Cellar. Has the same meaning as "basement."
Accessory Structure. A structure used solely for Coastal A Zone. Area within a SFHA, landward of a
parking (two-car detached garages or smaller) or V1-V30, VE, or V Zone or landward of an open coast
limited storage, represents a minimal investment without mapped coastal high hazard areas. In a
of not more than 10% of the value of the primary Coastal A Zone, the principal source of flood must be
structure, and may not be used for human habitation. astronomical tides, storm surges, seiches or tsunamis,
not riverine flooding. During the base flood conditions,
Appeal. A request for a review of the local
the potential for breaking wave height shall be greater
administrator's interpretation of any provision of this
than or equal to 1 1/2 feet (457 mm). The inland limit
section or a request for a variance.
of Coastal A Zone is: a) the limit of moderate wave
Area of Shallow Flooding. A designated AO, AH or action if delineated on a FIRM; or b) designated by the
VO Zone on a community's FIRM with a one-percent- authority having jurisdiction.
or-greater annual chance of flooding to an average
Coastal High Hazard Area. An area of special flood
annual depth of one foot to three feet where a clearly
hazard extending from offshore to the inland limit of
defined channel does not exist, where the path of
a primary frontal dune along an open coast and any
flooding is unpredictable and where velocity flow may
other area subject to high velocity wave action from
be evident. Such flooding is characterized by ponding
storms or seismic sources. The area is designated on
or sheet flow.
a FIRM as Zone V1-V30, VE, VO or V.
Area Of Special Flood Hazard. The land in the
Crawl Space. An enclosed area beneath the lowest
floodplain within a community subject to a one-
elevated floor, 18 inches or more in height, which
percent-or-greater chance of flooding in any given
is used to service the underside of the lowest
year. This area may be designated as Zone A, AE,
elevated floor. The elevation of the floor of this
AH, AO, A1-A30, A99, V, VO, VE, or V1-V30. It is also
enclosed area, which may be of soil, gravel, concrete
commonly referred to as the base floodplain or 100-
or other material, must be equal to or above the
year floodplain. For purposes of this section, the term
lowest adjacent exterior grade. The enclosed crawl
"special flood hazard area (SFHA)" is synonymous
space area shall be properly vented to allow for the
in meaning with the phrase "area of special flood
equalization of hydrostatic forces which would be
hazard."
experienced during periods of flooding.
Page 136
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 113 OF 148
Critical Facilities. even though the lower area is enclosed by
means of breakaway walls that meet the
1. Structures or facilities that produce, use or
federal standards.
store highly volatile, flammable, explosive,
toxic and/or water-reactive materials; Federal Emergency Management Agency.The
2. Hospitals, nursing homes, and housing federal agency that administers the National Flood
likely to contain occupants who may not be Insurance Program.
sufficiently mobile to avoid death or injury Flood Boundary And Floodway Map (Fbfm).
during a flood; An official map of the community published by the
3. Police stations, fire stations, vehicle and Federal Emergency Management Agency as part
equipment storage facilities, and emergency of a riverine community's Flood Insurance Study.
operations centers that are needed for flood The FBFM delineates a regulatory floodway along
response activities before, during, and after a watercourses studied in detail in the Flood Insurance
flood; and Study.
4. Public and private utility facilities that are Flood Elevation Study. An examination, evaluation
vital to maintaining or restoring normal and determination of the flood hazards and, if
services to flooded areas before, during and appropriate, corresponding water surface elevations,
after a flood. or an examination, evaluation and determination of
Development. Any man-made change to improved flood-related erosion hazards.
or unimproved real estate, including but not limited to
Flood Hazard Boundary Map (FHBM). An
buildings or other structures, mining, dredging, filling,
official map of a community, issued by the Federal
paving, excavation or drilling operations or storage of
Emergency Management Agency, where the
equipment or materials.
boundaries of the areas of special flood hazard have
Elevated Building. A non-basement building: been designated as Zone A but no flood elevations
are provided.
1. Built, in the case of a building in Zones
A1-A30, AE, A, A99, AO, AH, B, C, X, or D, to Flood Insurance Rate Map (Firm). An official map
have the top of the elevated floor, or in the of a community, on which the Federal Emergency
case of a building in Zones V1-30, VE, or V, Management Agency has delineated both the areas
to have the bottom of the lowest horizontal of special flood hazard and the risk premium zones
structural member of the elevated floor, applicable to the community.
elevated above the ground level by means of
Flood Insurance Study. See "flood elevation study."
pilings, columns (posts and piers), or shear
walls parallel to the flow of the water; and , Flood or Flooding.
2. Adequately anchored so as not to impair
1. A general and temporary condition of partial
the structural integrity of the building during
or complete inundation of normally dry land
a flood of up to the magnitude of the base
areas from:
flood. In the case of Zones A1-A30, AE, A,
A99, AO, AH, B, C, X, or D, "elevated building" a. The overflow of inland or tidal waters;
also includes a building elevated by means b. The unusual and rapid accumulation or
of fill or solid foundation perimeter walls runoff of surface waters from any source.
with openings sufficient to facilitate the
unimpeded movement of floodwaters. In the
case of Zones V1-V30, VE, or V, "elevated
building" also includes a building otherwise
meeting the definition of "elevated building,"
Page 137
114 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
2. "Flood" or "flooding" also means the collapse 2. Certified or preliminarily determined by the
or subsidence of land along the shore of Secretary of the Interior as contributing to the
a lake or other body of water as a result of historical significance of a registered historic
erosion or undermining caused by waves district or a district preliminarily determined
or currents of water exceeding anticipated by the Secretary to qualify as a registered
cyclical levels or suddenly caused by an historic district;
unusually high water level in a natural body 3. Individually listed on a state inventory
of water, accompanied by a severe storm, or of historic places in states with historic
by an unanticipated force of nature, such as preservation programs which have been
a flash flood or an abnormal tidal surge, or approved by the Secretary of the Interior; or
by some similarly unusual and unforeseeable
4. Individually listed on a local inventory of
event which results in flooding as defined in
historic places in communities with historic
Subsection (1)(a) above.
preservation programs that have been
Floodplain or Flood-Prone Area. Any land area certified either:
susceptible to being inundated by water from any
a. By an approved state program as
source (see definition of "flooding").
determined by the Secretary of the
Floodproofing. Any combination of structural and Interior; or
nonstructural additions, changes, or adjustments to b. Directly by the Secretary of the Interior in
structures which reduce or eliminate flood damage states without approved programs.
to real estate or improved real property, water and
sanitary facilities, structures and their contents. Limit Of Moderate Wave Action (LiMWA). Line
shown on FIRMs to indicate the inland limit of the 1 1/2
Floodway. Has the same meaning as "regulatory foot (457 mm) breaking wave height during the base
floodway." flood.
Functionally Dependent Use. A use which cannot Local Administrator. The person appointed by the
perform its intended purpose unless it is located community to administer and implement this section
or carried out in close proximity to water, such as by granting or denying development permits in
a docking or port facility necessary for the loading accordance with its provisions. This person is often
and unloading of cargo or passengers, shipbuilding, the Building Inspector, Code Enforcement Officer, or
and ship repair facilities. The term does not include employee of an engineering department.
long-term storage, manufacturing, sales, or service
facilities. Lowest Floor. Lowest floor of the lowest enclosed
area (including basement or cellar). An unfinished or
Highest Adjacent Grade. The highest natural flood-resistant enclosure, usable solely for parking of
elevation of the ground surface, prior to construction, vehicles, building access, or storage in an area other
next to the proposed walls of a structure. than a basement area is not considered a building's
lowest floor; provided that such enclosure is not
Historic Structure. Any structure that is:
built so as to render the structure in violation of the
1. Listed individually in the National Register of applicable non-elevation design requirements of this
Historic Places (a listing maintained by the section.
Department of the Interior) or preliminarily
determined by the Secretary of the Interior Manufactured Home. A structure, transportable in
as meeting the requirements for individual one or more sections, which is built on a permanent
listing on the National Register; chassis and designed to be used with or without
a permanent foundation when connected to the
required utilities. The term does not include a
"recreational vehicle."
Page 138
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 115 OF 148
Manufactured Home Park Or Subdivision. A parcel Regulatory Floodway. The channel of a river or other
(or contiguous parcels) of land divided into two or watercourse and the adjacent land areas that must be
more manufactured home lots for rent or sale. reserved in order to discharge the base flood without
cumulatively increasing the water surface elevation
Mean Sea Level. For purposes of the National Flood more than a designated height as determined by the
Insurance Program, the National Geodetic Vertical Federal Emergency Management Agency in a Flood
Datum (NGVD) of 1929, the North American Vertical Insurance Study or by other agencies as provided in
Datum of 1988 (NAVD 88), or other datum to which Subsection D(4)(b) of this section.
base flood elevations shown on a community's FIRM
are referenced. Sand Dunes. Naturally occurring accumulations of
sand in ridges or mounds landward of the beach.
Mobile Home. Has the same meaning as
"manufactured home." Start of Construction. The date of permit issuance
for new construction and substantial improvements
New Construction. Structures for which the start to existing structures, provided that actual start of
of construction commenced on or after the effective construction, repair, reconstruction, rehabilitation,
date of a floodplain management regulation adopted addition placement, or other improvement is within
by the community and includes any subsequent 180 days after the date of issuance. The actual start of
improvements to such structure. construction means the first placement of permanent
Primary Frontal Dune. A continuous or nearly construction of a building (including a manufactured
continuous mound or ridge of sand with relatively home) on a site, such as the pouring of a slab or
steep seaward and landward slopes immediately footings, installation of pilings or construction of
landward and adjacent to the beach and subject to columns. Permanent construction does not include
erosion and overtopping from high tides and waves land preparation (such as clearing, excavation,
during major coastal storms. The inland limit of the grading, or filling), or the installation of streets or
primary frontal dune occurs at the point where there walkways, or excavation for a basement, footings,
is a distinct change from a relatively steep slope to a piers or foundations, or the erection of temporary
relatively mild slope. forms, or the installation of accessory buildings such
as garages or sheds not occupied as dwelling units
Principally Aboveground. At least 51% of the actual or not part of the main building. For a substantial
cash value of the structure, excluding land value, is improvement, the actual "start of construction"
aboveground. means the first alteration of any wall, ceiling, floor,
or other structural part of a building, whether or not
Recreational Vehicle. A vehicle which is:
that alteration affects the external dimensions of the
1. Built on a single chassis; building.
2. Four hundred square feet or less when Structure. A walled and roofed building, including
measured at the largest horizontal a gas or liquid storage tank, that is principally
projections; aboveground, as well as a manufactured home.
3. Designed to be self-propelled or permanently
Substantial Damage. Damage of any origin
towable by a light-duty truck; and
sustained by a structure whereby the cost of restoring
4. Not designed primarily for use as a the structure to its before-damaged condition would
permanent dwelling but as temporary living equal or exceed 50% of the market value of the
quarters for recreational, camping, travel, or structure before the damage occurred.
seasonal use.
Page 139
116 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
Substantial Improvement. Any reconstruction, (B) 36029C0309J, 36029C0328J,
rehabilitation, addition, or other improvement of a 36029C0329J, 36029C0336J
structure, the cost of which equals or exceeds 50% whose effective dates are June
of the market value of the structure before the start of 16, 2021, and any subsequent
construction of the improvement. The term includes revisions to these map parcels
structures which have incurred substantial damage, that do not affect areas under
regardless of the actual repair work performed. The our community's jurisdiction.
term does not, however, include either: ii. A scientific and engineering report
1. Any project for improvement of a structure entitled "Flood Insurance Study, Erie
to correct existing violations of state or local County, New York (All Jurisdictions),"
health, sanitary, or safety code specifications dated June 16, 2021.
which have been identified by the local (A) The above documents are
code enforcement official and which are the hereby adopted and declared
minimum necessary to assure safe living to be a part of this section. The
conditions; or Flood Insurance Study and/
2. Any alteration of an historic structure or maps are on file at: Office of
provided that the alteration will not preclude Code Enforcement, City Hall, City
the structure's continued designation as an of Lackawanna.
historic structure. 3. Interpretation and conflict with other laws.
Variance. A grant of relief from the requirements of a. This section includes all revisions to
this section which permits construction or use in a the National Flood Insurance Program
manner that would otherwise be prohibited by this through October 27, 1997, and shall
section. supersede all previous laws adopted for
the purpose of flood damage prevention.
Violation. The failure of a structure or other
development to be fully compliant with the b. In their interpretation and application, the
community's floodplain management regulations. provisions of this section shall be held to
be minimum requirements, adopted for
C. General provisions. the promotion of the public health, safety,
1. Lands to which this section applies. This and welfare. Whenever the requirements
section shall apply to all areas of special of this section are at variance with
flood hazard within the jurisdiction of the City the requirements of any other lawfully
of Lackawanna. adopted rules, regulations, or ordinances,
the most restrictive, or that imposing the
2. Basis for establishing the areas of special
higher standards, shall govern.
flood hazard. [Amended 5-18-2021]
a. The areas of special flood hazard are 4. Severability. The invalidity of any section or
identified and defined on the following provision of this section shall not invalidate
documents prepared by the Federal any other section or provision thereof.
Emergency Management Agency:
i. Flood insurance rate maps:
(A) 36029C0333H, 36029C0337H,
36029C0341H whose effective
dates are June 7, 2019;
Page 140
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 117 OF 148
5. Penalties for noncompliance. No structure D. Administration.
in an area of special flood hazard shall
1. Designation of the local administrator.
hereafter be constructed, located, extended,
The Code Enforcement Officer is hereby
converted, or altered and no land shall be
appointed local administrator to administer
excavated or filled without full compliance
and implement this section by granting or
with the terms of this section and any other
denying floodplain development permits in
applicable regulations. Any infraction of the
accordance with its provisions.
provisions of this section by failure to comply
with any of its requirements, including 2. The floodplain development permit.
infractions of conditions and safeguards a. Purpose. A floodplain development permit
established in connection with conditions of is hereby established for all construction
the permit, shall constitute a violation. Any and other development to be undertaken
person who violates this section or fails to in areas of special flood hazard in this
comply with any of its requirements shall, community for the purpose of protecting
upon conviction thereof, be fined no more its citizens from increased flood hazards
than $250 or imprisoned for not more than and insuring that new development is
15 days or both. Each day of noncompliance constructed in a manner that minimizes
shall be considered a separate offense. its exposure to flooding. It shall be
Nothing herein contained shall prevent the unlawful to undertake any development
City of Lackawanna from taking such other in an area of special flood hazard, as
lawful action as necessary to prevent or shown on the Flood Insurance Rate Map
remedy an infraction. Any structure found enumerated in Subsection C(2), without
not compliant with the requirements of a valid floodplain development permit.
this section for which the developer and/or Application for a permit shall be made on
owner has not applied for and received an forms furnished by the local administrator
approved variance under Subsection F will and may include, but not be limited to,
be declared noncompliant and notification plans, in duplicate, drawn to scale and
sent to the Federal Emergency Management showing: the nature, location, dimensions,
Agency. and elevations of the area in question;
6. Warning and disclaimer of liability. The existing or proposed structures, fill,
degree of flood protection required by storage of materials, drainage facilities;
this section is considered reasonable and the location of the foregoing.
for regulatory purposes and is based on b. Fees. All applications for a floodplain
scientific and engineering considerations. development permit shall be
Larger floods can and will occur on rare accompanied by an application fee
occasions. Flood heights may be increased of $25. In addition, the applicant shall
by man-made or natural causes. This section be responsible for reimbursing the
does not imply that land outside the area City of Lackawanna for any additional
of special flood hazards or uses permitted costs necessary for review, inspection
within such areas will be free from flooding and approval of this project. The local
or flood damages. This section shall not administrator may require a deposit of no
create liability on the part of the City of more than $500 to cover these additional
Lackawanna, any officer or employee thereof, costs.
or the Federal Emergency Management
Agency, for any flood damages that result
from reliance on this section or any
administrative decision lawfully made there
under.
Page 141
118 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
3. Application for a permit. The applicant f. A description of the extent to which
shall provide the following information as any watercourse will be altered or
appropriate. Additional information may be relocated as a result of proposed
required on the permit application form. development. Computations by a
a. The proposed elevation, in relation to licensed professional engineer must
mean sea level, of the top of the lowest be submitted that demonstrate that the
floor (including basement or cellar) of any altered or relocated segment will provide
new or substantially improved structure equal or greater conveyance than the
to be located in Zones A1-A30, AE or AH, original stream segment. The applicant
or Zone A if base flood elevation data are must submit any maps, computations or
available. Upon completion of the lowest other material required by the Federal
floor, the permitee shall submit to the Emergency Management Agency (FEMA)
local administrator the as-built elevation, to revise the documents enumerated in
certified by a licensed professional Subsection C(2), when notified by the
engineer or surveyor. local administrator, and must pay any fees
or other costs assessed by FEMA for this
b. The proposed elevation, in relation to purpose. The applicant must also provide
mean sea level, of the bottom of the assurances that the conveyance capacity
lowest structural member of the lowest of the altered or relocated stream
floor (excluding pilings and columns) segment will be maintained.
of any new or substantially improved
structure to be located in Zones V1-V30 g. A technical analysis, by a licensed
or VE, or Zone V if base flood elevation professional engineer, if required by the
data are available. Upon completion local administrator, which shows whether
of the lowest floor, the permitee shall proposed development to be located in
submit to the local administrator the an area of special flood hazard may result
as-built elevation, certified by a licensed in physical damage to any other property.
professional engineer or surveyor. h. In Zone A, when no base flood elevation
c. The proposed elevation, in relation to data are available from other sources,
mean sea level, to which any new or base flood elevation data shall be
substantially improved nonresidential provided by the permit applicant for
structure will be floodproofed. Upon subdivision proposals and other proposed
completion of the floodproofed portion of developments (including proposals for
the structure, the permitee shall submit manufactured home and recreational
to the local administrator the as-built vehicle parks and subdivisions) that are
floodproofed elevation, certified by a greater than either 50 lots or five acres.
professional engineer or surveyor. i. In Zones V1-V30 and VE, and also Zone
d. A certificate from a licensed professional V if base flood elevation are available,
engineer or architect that any utility designs and specifications, certified
floodproofing will meet the criteria in by a licensed professional engineer or
Section 5.2-3, UTILITIES. architect, for any breakaway walls in a
proposed structure with design strengths
e. A certificate from a licensed professional in excess of 20 pounds per square foot.
engineer or architect that any
nonresidential floodproofed structure
will meet the floodproofing criteria
in Subsection E(5), Nonresidential
structures.
Page 142
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 119 OF 148
j. In Zones V1-V30 and VE, and also Zone proposals.
V if base flood elevation are available, for iii. Determine whether any proposed
all new and substantial improvements development in an area of
to structures, floodplain development special flood hazard may result
permit applications shall be accompanied in physical damage to any other
by design plans and specifications, property (e.g., stream bank erosion
prepared in sufficient detail to enable and increased flood velocities).
independent review of the foundation The local administrator may
support and connection components. require the applicant to submit
Said plans and specifications shall be additional technical analyses and
developed or reviewed by a licensed data necessary to complete the
professional engineer or architect, and determination. If the proposed
shall be accompanied by a statement, development may result in physical
bearing the signature of the architect or damage to any other property
engineer, certifying that the design and or fails to meet the requirements
methods of construction to be used are in of Subsection E, Construction
accordance with accepted standards of standards, no permit shall be
practice and with all applicable provisions issued. The applicant may revise the
of this section. application to include measures that
4. Duties and responsibilities of the mitigate or eliminate the adverse
local administrator. Duties of the local effects and resubmit the application.
administrator shall include, but not be limited IV. Determine that all necessary permits
to, the following: have been received from those
a. Permit application review. The local governmental agencies from which
administrator shall conduct the following approval is required by state or
permit application review before issuing a federal law.
floodplain development permit: b. Use of other flood data.
i. Review all applications for i. When the Federal Emergency
completeness, particularly with the Management Agency has designated
requirements of Subsection D(3), areas of special flood hazard on the
Application for a permit, and for community's Flood Insurance Rate
compliance with the provisions and Map (FIRM) but has neither produced
standards of this section. water surface elevation data (these
ii. Review subdivision and other areas are designated Zone A or V on
proposed new development, the FIRM) nor identified a floodway,
including manufactured home parks, the local administrator shall obtain,
to determine whether proposed review and reasonably utilize any
building sites will be reasonably safe base flood elevation and floodway
from flooding. If a proposed building data available from a federal, state
site is located in an area of special or other source, including data
flood hazard, all new construction developed pursuant to Subsection
and substantial improvements shall D(3)(h), as criteria for requiring
meet the applicable standards that new construction, substantial
of Subsection E, Construction improvements or other proposed
standards, and, in particular, development meet the requirements
Subsection E(1)(b), Subdivision of this section.
Page 143
120 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
ii. When base flood elevation data are vehicle if it remains on a site for 180
not available, the local administrator consecutive days or longer (unless
may use flood information from any it is fully licensed and ready for
other authoritative source, such as highway use).
historical data, to establish flood ii. In Zones V1-V30, VE, and V if base
elevations within the areas of special flood elevation data are available,
flood hazard, for the purposes of this upon placement of the lowest floor
section. of a new or substantially improved
c. Alteration of watercourses. structure, the permit holder shall
submit to the local administrator a
i. Notification to adjacent municipalities certificate of elevation, in relation
that may be affected and the to mean sea level, of the bottom
New York State Department of of the lowest structural member of
Environmental Conservation prior the lowest floor (excluding pilings
to permitting any alteration or and columns). The certificate shall
relocation of a watercourse and be prepared by or under the direct
submit evidence of such notification supervision of a licensed land
to the Regional Administrator, Region surveyor or professional engineer and
II, Federal Emergency Management certified by same. For manufactured
Agency. homes, the permit holder shall submit
ii. Determine that the permit holder the certificate of elevation upon
has provided for maintenance within placement of the structure on the site.
the altered or relocated portion of An elevation certificate must also be
said watercourse so that the flood- submitted for a recreational vehicle if
carrying capacity is not diminished. it remains on a site 180 consecutive
days or longer (unless it is fully
d. Construction stage.
licensed and ready for highway use).
i. In Zones A1-A30, AE, AH, and
iii. Any further work undertaken prior
Zone A if base flood elevation data
to submission and approval of the
are available, upon placement of
certification shall be at the permit
the lowest floor or completion
holder's risk. The local administrator
of floodproofing of a new or
shall review all data submitted.
substantially improved structure,
Deficiencies detected shall be cause
obtain from the permit holder a
to issue a stop-work order for the
certification of the as-built elevation
project unless immediately corrected.
of the lowest floor or floodproofed
elevation, in relation to mean
sea level. The certificate shall be
prepared by or under the direct
supervision of a licensed land
surveyor or professional engineer and
certified by same. For manufactured
homes, the permit holder shall submit
the certificate of elevation upon
placement of the structure on the
site. A certificate of elevation must
also be submitted for a recreational
Page 144
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 121 OF 148
e. Inspections. The local administrator and/ ii. A certificate of compliance shall be
or the developer's engineer or architect issued by the local administrator
shall make periodic inspections at upon satisfactory completion of all
appropriate times throughout the period development in areas of special flood
of construction in order to monitor hazard.
compliance with permit conditions iii. Issuance of the certificate shall
and enable said inspector to certify, if be based upon the inspections
requested, that the development is in conducted as prescribed in
compliance with the requirements of the Subsection D(4)(e), Inspections, and/
floodplain development permit and/or any or any certified elevations, hydraulic
variance provisions. data, floodproofing, anchoring
f. Stop-work orders. requirements or encroachment
analyses which may have been
vii. The local administrator shall issue, or
required as a condition of the
cause to be issued, a stop-work order
approved permit.
for any floodplain development found
ongoing without a development h. Information to be retained. The local
permit. Disregard of a stop-work administrator shall retain and make
order shall subject the violator to the available for inspection copies of the
penalties described in Subsection following:
C(5) of this section.
i. Floodplain development permits and
viii. The local administrator shall issue, or certificates of compliance;
cause to be issued, a stop-work order
ii. Certifications of as-built lowest floor
for any floodplain development found
elevations of structures required
noncompliant with the provisions of
pursuant to Subsection D(4)(d)[1]
this section and/or the conditions of
and [2], and whether the structures
the development permit. Disregard of
contain a basement;
a stop-work order shall subject the
violator to the penalties described in iii. Floodproofing certificates required
Subsection C(5) of this section. pursuant to Subsection D(4)(d)[1],
and whether the structures contain a
g. Certificate of compliance. basement;
i. In areas of special flood hazard, iv. Variances issued pursuant to
as determined by documents Subsection F, Variance procedures;
enumerated in Subsection C(2), it and
shall be unlawful to occupy or to
v. Notices required under Subsection
permit the use or occupancy of any
D(4)(c), Alteration of watercourses.
building or premises, or both, or part
thereof hereafter created, erected, vi. Base flood elevations developed
changed, converted or wholly or pursuant to Subsection D(3)(g) and
partly altered or enlarged in its use supporting technical analysis.
or structure until a certificate of
compliance has been issued by the
local administrator stating that the
building or land conforms to the
requirements of this section.
Page 145
122 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
E. Construction standards. iv. Proposed development shall
not result in physical damage to
1. General standards. The following standards
any other property (e.g., stream
apply to new development, including new
bank erosion or increased flood
and substantially improved structures, in
velocities). If requested by the local
the areas of special flood hazard shown on
administrator, the applicant shall
the Flood Insurance Rate Map designated in
provide a technical analysis, by
Subsection C(2).
a licensed professional engineer,
a. Coastal high hazard areas and Coastal A demonstrating that this condition has
Zones. The following requirements apply been met.
within Zones V1-V30, VE and V:
v. Proposed development shall be
i. All new construction, including designed, located, and constructed
manufactured homes and so as to offer the minimum resistance
recreational vehicles on site 180 to the flow of water and shall be
days or longer and not fully licensed designed to have a minimum effect
for highway use, shall be located upon the height of floodwater.
landward of the reach of high tide. vi. Any equipment or materials located
ii. The use of fill for structural support in a special flood hazard area shall be
of buildings, manufactured homes or elevated, anchored, and floodproofed
recreational vehicles on site 180 days as necessary to prevent flotation,
or longer is prohibited. flood damage, and the release of
iii. Man-made alteration of sand dunes hazardous substances.
which would increase potential flood vii. No alteration or relocation of a
damage is prohibited. watercourse shall be permitted
unless:
b. Subdivision and development proposals.
The following standards apply to all (A) A technical evaluation by a
new subdivision proposals and other licensed professional engineer
proposed development in areas of special demonstrates that the altered or
flood hazard (including proposals for relocated segment will provide
manufactured home and recreational conveyance equal to or greater
vehicle parks and subdivisions): than that of the original stream
segment and will not result in
i. Proposals shall be consistent with the
physical damage to any other
need to minimize flood damage.
property;
ii. Public utilities and facilities such
as sewer, gas, electrical and water
systems shall be located and
constructed to minimize flood
damage.
iii. [Adequate drainage shall be provided
to reduce exposure to flood damage.
Page 146
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 123 OF 148
(B) If warranted, a conditional (B) The City of Lackawanna
revision of the Flood Insurance agrees to apply to the Federal
Rate Map is obtained from the Emergency Management
Federal Emergency Management Agency (FEMA) for a conditional
Agency, with the applicant FIRM revision, FEMA approval
providing the necessary is received and the applicant
data, analyses, and mapping provides all necessary data,
and reimbursing the City of analyses and mapping
Lackawanna for all fees and and reimburses the City of
other costs in relation to the Lackawanna for all fees and
application; and other costs in relation to the
(C) The applicant provides application. The applicant must
assurance that maintenance also provide all data, analyses
will be provided so that the and mapping and reimburse the
flood-carrying capacity of the City of Lackawanna for all costs
altered or relocated portion related to the final map revision.
of the watercourse will not be ii. On streams with a regulatory
diminished. floodway, as shown on the Flood
c. Encroachments. Boundary and Floodway Map or
the Flood Insurance Rate Map
i. Within Zones A1-A30 and AE, adopted in Subsection C(2), no
on streams without a regulatory new construction, substantial
floodway, no new construction, improvements or other development
substantial improvements or other in the floodway (including fill) shall be
development (including fill) shall be permitted unless:
permitted unless:
(A) A technical evaluation by a
(A) The applicant demonstrates licensed professional engineer
that the cumulative effect of the demonstrates through hydrologic
proposed development, when and hydraulic analyses
combined with all other existing performed in accordance with
and anticipated development, standard engineering practice
will not increase the water that such an encroachment shall
surface elevation of the base not result in any increase in flood
flood more than one foot at any levels during occurrence of the
location; or base flood; or
Page 147
124 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
(B) The City of Lackawanna 2. Standards for all structures. The following
agrees to apply to the Federal standards apply to new development,
Emergency Management including new and substantially improved
Agency (FEMA) for a conditional structures, in the areas of special flood
FIRM and floodway revision, hazard shown on the Flood Insurance Rate
FEMA approval is received Map designated in Subsection C(2).
and the applicant provides all a. Anchoring. New structures and
necessary data, analyses and substantial improvement to structures
mapping and reimburses the in areas of special flood hazard shall be
City of Lackawanna for all fees anchored to prevent flotation, collapse,
and other costs in relation to the or lateral movement during the base
application. The applicant must flood. This requirement is in addition
also provide all data, analyses to applicable state and local anchoring
and mapping and reimburse the requirements for resisting wind forces.
City of Lackawanna for all costs
b. Construction materials and methods.
related to the final map revisions.
iii. In Zones A1-A30, AE and AH, i. New construction and substantial
and also Zone A if base flood improvements to structures shall be
elevation data are available, if any constructed with materials and utility
development is found to increase equipment resistant to flood damage.
or decrease base flood elevations, ii. New construction and substantial
the City of Lackawanna shall as improvements to structures shall
soon as practicable, but not later be constructed using methods
than six months after the date such and practices that minimize flood
information becomes available, damage.
notify FEMA and the New York
iii. Enclosed areas below lowest floor.
State Department of Environmental
Conservation of the changes by (A) For enclosed areas below
submitting technical or scientific the lowest floor of a structure
data in accordance with standard within Zones A1-A30, AE, AO
engineering practice. or A, new and substantially
improved structures shall have
iv. Whenever any portion of a floodplain
fully enclosed areas below the
is authorized for development, the
lowest floor that are useable
volume of space occupied by the
solely for parking of vehicles,
authorized fill or structure below
building access or storage in an
the base flood elevation shall be
area other than a basement and
compensated for and balanced by
which are subject to flooding,
a hydraulically equivalent volume
designed to automatically
of excavation taken from below the
equalize hydrostatic flood
base flood elevation at or adjacent
forces on exterior walls by
to the development site. All such
allowing for the entry and
excavations shall be construed to
exit of floodwaters. Designs
drain freely to the watercourse. No
for meeting this requirement
area below the waterline of a pond or
must either be certified by a
other body of water can be credited
licensed professional engineer or
as a compensating excavation.
architect or meet or exceed the
following minimum criteria:
Page 148
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 125 OF 148
(1) A minimum of two openings (B) Utilities.
of each enclosed area (1) New and replacement
having a total net area of electrical equipment,
not less than one square heating, ventilating, air
inch for every square foot conditioning, plumbing
of enclosed area subject to connections, and other
flooding; service equipment shall
(2) The bottom of all such be located at least two
openings no higher than one feet above the base flood
foot above grade; and elevation, or be designed to
(3) Openings not less than three prevent water from entering
inches in any direction. and accumulating within the
components during a flood
(B) Openings may be equipped with and to resist hydrostatic
louvers, valves, screens or other and hydrodynamic loads
coverings or devices provided and stresses. Electrical
they permit the automatic entry wiring and outlets, switches,
and exit of floodwaters. Enclosed junction boxes and
areas subgrade on all sides are panels shall be elevated
considered basements and are or designed to prevent
not permitted. water from entering and
iv. Within Zones V1-V30 and VE, accumulating within the
and also within Zone V if base components unless they
flood elevation are available, new conform to the appropriate
construction and substantial provisions of the electrical
improvements shall have the space part of the Building Code
below the lowest floor either free of New York State or the
from obstruction or constructed with Residential Code of New
nonsupporting breakaway walls, York State for location of
open wood lattice-work or insect such items in wet locations;
screening intended to collapse [Amended 6-29-2021]
under wind and water loads without (2) New and replacement
causing collapse, displacement, water supply systems shall
or other structural damage to the be designed to minimize
elevated portion of the building or eliminate infiltration of
or supporting foundation system. floodwaters into the system;
The enclosed space below the
lowest floor shall be used only for
parking vehicles, building access or
storage. Use of this space for human
habitation is expressly prohibited.
The construction of stairs, stairwells
and elevator shafts are subject to the
design requirements for breakaway
walls.
Page 149
126 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
(3) New and replacement 3. Residential structures (except coastal high
sanitary sewage systems hazard areas).
shall be designed to a. Elevation. The following standards apply
minimize or eliminate to new and substantially improved
infiltration of floodwaters. residential structures located in areas
Sanitary sewer and storm of special flood hazard, in addition to
drainage systems for the requirements in Subsections E(1)
buildings that have openings (b), Subdivision proposals, and E(1)(c),
below the base flood Encroachments, and Subsection E(2),
elevation shall be provided Standards for all structures.
with automatic backflow
valves or other automatic i. Within Zones A1-A30, AE and AH and
backflow devices that are also Zone A if base flood elevation
installed in each discharge data are available, new construction
line passing through a and substantial improvements shall
building's exterior wall; and have the top of the lowest floor
(including basement) elevated to or
(4) On-site waste disposal
above two feet above the base flood
systems shall be located to
elevation.
avoid impairment to them
or contamination from them ii. Within Zone A: [Amended 6-29-2021]
during flooding. b. When no base flood elevation data are
(D). Storage tanks. available, a base flood elevation shall be
determined by either:
(1) Underground tanks shall
be anchored to prevent i. Obtain and reasonably use data
flotation, collapse and lateral available from a federal, state,
movement during conditions or other source plus two feet of
of the base flood. freeboard; or
(2) Aboveground tanks shall be: ii. Determine the base flood elevation in
accordance with accepted hydrologic
a. Anchored to prevent flotation, collapse or
and hydraulic engineering practice,
lateral movement during conditions of the
plus two feet of freeboard.
base flood; or
b. Determinations shall be undertaken
b. Installed at or above the base flood
by a registered design professional
elevation as shown on the Flood
who shall document that the technical
Insurance Rate Map enumerated in
methods used reflect currently accepted
Subsection C(2) plus two feet.
engineering practice. Studies, analyses,
and computations shall be submitted in
sufficient detail to allow thorough review
and approval.
Page 150
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 127 OF 148
c. Within Zone AO, new construction b. Determination of loading forces.
and substantial improvements shall Structural design shall consider the
have the lowest floor (including effects of wind and water loads acting
basement) elevated above the highest simultaneously during the base flood on
adjacent grade at least as high as the all building components.
depth number specified in feet on the
i. The structural design shall be
community's Flood Insurance Rate Map
adequate to resist water forces that
enumerated in Subsection C(2) plus two
would occur during the base flood.
feet (at least three feet if no depth number
Horizontal water loads considered
is specified).
shall include inertial and drag forces
d. Within Zones AH and AO, adequate of waves, current drag forces, and
drainage paths are required to guide impact forces from waterborne storm
floodwaters around and away from debris. Dynamic uplift loads shall also
proposed structures on slopes. be considered if bulkheads, walls,
4. Residential structures (coastal high hazard or other natural or man-made flow
areas and Coastal A Zones). The following obstructions could cause wave runup
standards, in addition to the standards in beyond the elevation of the base
Subsections E(1)(a), Coastal high hazard flood.
areas and Coastal A Zones, and E(1)(b), ii. Buildings shall be designed and
Subdivision proposals, and Subsection constructed to resist the forces due
E(2), Standards for all structures, apply to to wind pressure. Wind forces on the
new and substantially improved residential superstructure include windward
structures located in areas of special flood and leeward forces on vertical walls,
hazard shown as Zones V1-V30, VE or V on uplift on the roof, internal forces
the community's Flood Insurance Rate Map when openings allow wind to enter
designated in Subsection C(2). the house, and upward force on
a. Elevation. New construction and the underside of the house when
substantial improvements shall be it is exposed. In the design, the
elevated on pilings, columns or shear wind should be assumed to blow
walls such that the bottom of the lowest potentially from any lateral direction
horizontal structural member supporting relative to the house.
the lowest elevated floor (excluding iii. Wind loading values used shall be
columns, piles, diagonal bracing attached those required by the building code.
to the piles or columns, grade beams,
pile caps and other members designed
to either withstand storm action or break
away without imparting damaging loads
to the structure) is elevated to or above
two feet above base flood elevation so as
not to impede the flow of water.
Page 151
128 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
c. Foundation standards. iii Pile foundation analysis shall also
include consideration of piles in
i. The pilings or column foundation
column action from the bottom of the
and structure attached thereto
structure to the stable soil elevation
shall be adequately anchored to
of the site. Pilings may be horizontally
resist flotation, collapse or lateral
or diagonally braced to withstand
movement due to the effects of
wind and water forces.
wind and water pressures acting
simultaneously on all building iv. The minimum acceptable sizes for
components. Foundations must be timber piles are a tip diameter of
designed to transfer safely to the eight inches for round timber piles
underlying soil all loads due to wind, and eight inches by eight inches for
water, dead load, live load and other square timber piles. All wood piles
loads (including uplift due to wind must be treated in accordance with
and water). requirements of EPEE-C3 to minimize
decay and damage from fungus.
ii. Spread footings and fill material shall
not be used for structural support v. Reinforced concrete piles shall be
of a new building or substantial cast of concrete having a twenty-
improvement of an existing structure. eight-day ultimate compressive
strength of not less than 5,000
d. Pile foundation design. pounds per square inch, and shall
i. The design ratio of pile spacing to be reinforced with a minimum of
pile diameter shall not be less than four longitudinal steel bars having
8:1 for individual piles (this shall not a combined area of not less than
apply to pile clusters located below 1% nor more than 4% of the gross
the design grade). The maximum concrete area. Reinforcing for precast
center-to-center spacing of wood piles shall have a concrete cover of
piles shall not be more than 12 feet not less than 1 1/4 inches for No. 5
on center under load-bearing sills, bars and smaller and not less than
beams, or girders. 1 1/2 inches for No. 6 through No. 11
bars. Reinforcement for piles cast in
ii. Pilings shall have adequate soil
the field shall have a concrete cover
penetration (bearing capacity)
of not less than two inches.
to resist the combined wave and
wind loads (lateral and uplift) vi. Piles shall be driven by means of a
associated with the base flood acting pile driver or drop hammer, jetted, or
simultaneously with typical structure augered into place.
(live and dead) loads, and shall vii. Additional support for piles in the
include consideration of decreased form of bracing may include lateral or
resistance capacity caused by diagonal bracing between piles.
erosion of soil strata surrounding the
piles. The minimum penetration for
foundation piles is to an elevation of
five feet below mean sea level (msl)
datum if the BFE is +10 msl or less, or
to be at least 10 feet below msl if the
BFE is greater than +10 msl.
Page 152
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 129 OF 148
viii. When necessary, piles shall be f. Connectors and fasteners. Galvanized
braced at the ground line in both metal connectors, wood connectors,
directions by a wood timber grade or bolts of size and number adequate
beam or a reinforced concrete grade for the calculated loads must be used
beam. These at-grade supports to connect adjoining components of
should be securely attached to a structure. Toe nailing as a principal
the piles to provide support even if method of connection is not permitted.
scoured from beneath. All metal connectors and fasteners
ix. Diagonal bracing between piles, used in exposed locations shall be steel,
consisting of two-inch-by-eight-inch hot-dipped galvanized after fabrication.
(minimum) members bolted to the Connectors in protected interior locations
piles, shall be limited in location shall be fabricated from galvanized sheet.
to below the lowest supporting g. Beam to pile connections. The primary
structural member and above the floor beams or girders shall span the
stable soil elevation, and aligned in supports in the direction parallel to the
the vertical plane along pile rows flow of potential floodwater and wave
perpendicular to the shoreline. action and shall be fastened to the
Galvanized steel rods (minimum columns or pilings by bolting, with or
diameter 1/2 inch) or cable type without cover plates. Concrete members
bracing is permitted in any plane. shall be connected by reinforcement,
x. [Knee braces, which stiffen both the if cast in place, or (if precast) shall be
upper portion of a pile and the beam- securely connected by bolting and
to-pile connection, may be used welding. If sills, beams, or girders are
along pile rows perpendicular and attached to wood piling at a notch, a
parallel to the shoreline. Knee braces minimum of two 5/8-inch galvanized
shall be two-by-eight lumber bolted steel bolts or two hot-dipped galvanized
to the sides of the pile/beam, or four- straps 3/16-inch by four inches by 18
by-four or larger braces framed into inches each bolted with two 1/2-inch
the pile/beam. Bolting shall consist lag bolts per beam member shall be
of two 5/8-inch galvanized steel used. Notching of pile tops shall be the
bolts (each end) for two-by-eight minimum sufficient to provide ledge
members, or one 5/8-inch lag bolt support for beam members without
(each end) for square members. Knee unduly weakening pile connections. Piling
braces shall not extend more than shall not be notched so that the cross
three feet below the elevation of the section is reduced below 50%.
base flood.
e. Column foundation design.
i. Masonry piers or poured-in-place
concrete piers shall be internally
reinforced to resist vertical and lateral
loads, and be connected with a
movement-resisting connection to a
pile cap or pile shaft.
Page 153
130 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
h. Floor and deck connections. joints. In lieu of the plywood,
galvanized steel rods of 1/2-inch
i. Wood two-by-four-inch (minimum)
diameter or galvanized steel
connectors or metal joist anchors
straps not less than one inch
shall be used to tie floor joists to
wide by 1/16-inch thick may be
floor beams/girders. These should be
used to connect from the top
installed on alternate floor joists, at a
wall plate to the sill, beam, or
minimum. Cross bridging of all floor
girder. Washers with a minimum
joists shall be provided. Such cross
diameter of three inches shall be
bridging may be one-by-three-inch
used at each end of the 1/2-inch
members, placed eight feet on center
round rods. These anchors shall
maximum, or solid bridging of same
be installed no more than two
depth as joist at same spacing.
feet from each corner rod, no
ii. Plywood should be used for more than four feet on center.
subflooring and attic flooring to
j. Ceiling joist/rafter connections.
provide good torsional resistance in
the horizontal plane of the structure. i. All ceiling joists or rafters shall be
The plywood should not be less than installed in such a manner that
3/4-inch total thickness, and should the joists provide a continuous tie
be exterior grade and fastened to across the rafters. Ceiling joists and
beams or joists with 8d annular or rafters shall be securely fastened at
spiral thread galvanized nails. Such their intersections. A metal or wood
fastening shall be supplemented connector shall be used at alternate
by the application of waterproof ceiling joist/rafter connections to the
industrial adhesive applied to all wall top plate.
bearing surfaces. ii. Gable roofs shall be additionally
(A) Exterior wall connections. All stabilized by installing two-by-four
bottom plates shall have any blocking on two-foot centers
required breaks under a wall between the rafters at each gable
stud or an anchor bolt. Approved end. Blocking shall be installed a
anchors will be used to secure minimum of eight feet toward the
rafters or joists and top and house interior from each gable end.
bottom plates to studs in exterior k. Projecting members. All cantilevers
and bearing walls to form a and other projecting members must be
continuous tie. Continuous adequately supported and braced to
15/32-inch or thicker plywood withstand wind and water uplift forces.
sheathing-overlapping the top Roof eave overhangs shall be limited to a
wall plate and continuing down maximum of two feet and joist overhangs
to the sill, beam, or girder-may be to a maximum of one foot. Larger
used to provide the continuous overhangs and porches will be permitted
tie. If the sheets of plywood are if designed or reviewed and certified by
not vertically continuous, then a registered professional engineer or
two-by-four-nailer blocking shall architect.
be provided at all horizontal
Page 154
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 131 OF 148
l. Roof sheathing. be confirmed using established
procedures. Grade beams shall be
i. Plywood, or other wood material,
installed in both directions for all piles
when used as roof sheathing,
considered to carry the breakaway
shall not be less than 15/32 inch in
wall load. Knee braces are required
thickness, and shall be of exterior
for front row piles that support
sheathing grade or equivalent. All
breakaway walls.
attaching devices for sheathing and
roof coverings shall be galvanized ii. Use of breakaway wall strengths
or be of other suitable corrosion- in excess of 20 pounds per square
resistant material. foot shall not be permitted unless
a registered professional engineer
ii. All corners, gable ends, and roof
or architect has developed or
overhangs exceeding six inches shall
reviewed the structural design
be reinforced by the application
and specifications for the building
of waterproof industrial adhesive
foundation and breakaway wall
applied to all bearing surfaces of any
components, and certifies that:
plywood sheet used in the sheathing
1) the breakaway walls will fail
of such corner, gable end, or roof
under water loads less than those
overhang.
that would occur during the base
iii. In addition, roofs should be sloped as flood; and 2) the elevated portion
steeply as practicable to reduce uplift of the building and supporting
pressures, and special care should be foundation system will not be
used in securing ridges, hips, valleys, subject to collapse, displacement,
eaves, vents, chimneys, and other or other structural damage due
points of discontinuity in the roofing to the effects of wind and water
surface. loads acting simultaneously on all
m. Protection of openings. All exterior glass building components (structural
panels, windows, and doors shall be and nonstructural). Water loading
designed, detailed, and constructed to values used shall be those associated
withstand loads due to the design wind with the base flood. Wind loading
speed of 75 mph. Connections for these values shall be those required by the
elements must be designed to transfer building code.
safely the design loads to the supporting 5. Nonresidential structures (except
structure. Panel widths of multiple panel coastal high hazard areas). The following
sliding glass doors shall not exceed three standards apply to new and substantially
feet. improved commercial, industrial and
n. Breakaway wall design standards. other nonresidential structures located in
areas of special flood hazard, in addition
i. The breakaway wall shall have a
to the requirements in Subsections E(1)
design safe loading resistance of
(b), Subdivision proposals, and E(1)(c),
not less than 10 and not more than
Encroachments, and Subsection E(2),
20 pounds per square foot, with the
Standards for all structures.
criterion that the safety of the overall
structure at the point of wall failure
Page 155
132 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
a. Within Zones A1-A30, AE and AH, and c. If the structure is to be floodproofed,
also Zone A if base flood elevation a licensed professional engineer or
data are available, new construction architect shall develop and/or review
and substantial improvements of any structural design, specifications, and
nonresidential structure, together with plans for construction. A floodproofing
attendant utility and sanitary facilities, certificate or other certification shall
shall either: be provided to the local administrator
that certifies the design and methods
i. Have the lowest floor, including
of construction are in accordance with
basement or cellar, elevated to or
accepted standards of practice for
above two feet above the base flood
meeting the provisions of Subsection E(5)
elevation; or,
(a)[2], including the specific elevation (in
ii. Be floodproofed so that the structure relation to mean sea level) to which the
is watertight below two feet above structure is to be floodproofed.
the base flood elevation, including
d. Within Zones AH and AO, adequate
attendant utility and sanitary facilities,
drainage paths are required to guide
with walls substantially impermeable
floodwaters around and away from
to the passage of water. All structural
proposed structures on slopes.
components located below the
base flood elevation must be e. Within Zone A, when no base flood
capable of resisting hydrostatic and elevation data are available, the lowest
hydrodynamic loads and the effects floor (including basement) shall be
of buoyancy. elevated at least three feet above the
highest adjacent grade.
b. Within Zone AO, new construction
and substantial improvements of 6. Nonresidential structures (coastal high
nonresidential structures shall: hazard areas and Coastal A Zones). In Zones
V1-V30, VE and also Zone V if base flood
i. Have the lowest floor (including elevations are available, new construction
basement) elevated above the and substantial improvements of any
highest adjacent grade at least as nonresidential structure, together with
high as the depth number specified attendant utility and sanitary facilities, shall
in feet on the community's FIRM have the bottom of lowest member of the
plus two feet (at least three feet if no lowest floor elevated to or above two feet
depth number is specified); or above the base flood elevation. Floodproofing
ii. Together with attendant utility and of structures is not an allowable alternative to
sanitary facilities, be completely elevating the lowest floor to two feet above
floodproofed to that level to meet the the base flood elevation in Zones V1-V30, VE
floodproofing standard specified in and V.
Subsection E(5)(a)[2]. 7. Manufactured homes and recreational
vehicles. The following standards in addition
to the standards in Subsections E(1),
General standards, and E(2), Standards for
all structures, apply, as indicated, in areas
of special flood hazard to manufactured
homes and to recreational vehicles which are
located in areas of special flood hazard.
Page 156
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 133 OF 148
a. Recreational vehicles. e. Within V or VE, manufactured homes
must meet the requirements of
i. Recreational vehicles placed on sites
Subsection E(4).
within Zones A, A1-A30, AE, AH, AO,
V1-V30, V, and VE shall either: 8. Accessory structures, including detached
garages. The following standards apply to
(A) Be on site fewer than 180
new and substantially improved accessory
consecutive days;
structures, including detached garages, in
(B) Be fully licensed and ready for the areas of special flood hazard shown on
highway use; or the Flood Insurance Rate Map designated in
(C) Meet the requirements for Subsection C(2).
manufactured homes in a. Within Zones A1-A30, AE, AO, AH,
Subsection E(7)(b), (c) and (d). A, accessory structures must meet
ii. A recreational vehicle is ready for the standards of Subsection E(2)(a),
highway use if it is on its wheels or Anchoring.
jacking system, is attached to the site b. Within Zones A1-A30, AE and AH, and also
only by quick disconnect type utilities Zone A if base flood elevation data are
and security devices and has no available, areas below two feet above the
permanently attached additions. base flood elevation shall be constructed
b. A manufactured home that is placed using methods and practices that
or substantially improved in Zones minimize flood damage.
A1-A30, AE, and AH shall be elevated on c. Within Zones AO and Zone A, if base
a permanent foundation such that the flood elevation data are not available,
bottom of the frame of the manufactured areas below three feet above the highest
home chassis is elevated to or above two adjacent grade shall be constructed using
feet above the base flood elevation and methods and practices that minimize
is securely anchored to an adequately flood damage.
anchored foundation system to resist d. Structures must be designed to
flotation, collapse and lateral movement. automatically equalize hydrostatic flood
Elevation on piers consisting of dry forces on exterior walls by allowing
stacked blocks is prohibited. for the entry and exit of floodwaters in
c. Within Zone A, the bottom of the frame of accordance with Subsection E(2)(c),
the manufactured home shall be elevated Utilities.
to meet the requirements of Subsection e. Within Zones V1-V30, VE, and V,
E(3)(a)[2]. [Amended 6-29-2021] accessory structures (unless properly
d. Within Zone AO, the bottom of the frame elevated to the base flood elevation plus
of the manufactured home chassis shall two feet on piles or columns) must be
be elevated above the highest adjacent limited to small, low-value structures that
grade at least as high as the depth are disposable. If a community wishes to
number specified on the Flood Insurance allow unelevated accessory buildings, it
Rate Map enumerated in Subsection must define "small" and "low cost."
C(2) plus two feet (at least three feet if no f. Within Zones V1-V30, VE, and V,
depth number is specified). Elevation on unelevated accessory buildings must
piers consisting of dry stacked blocks is be unfinished inside, constructed with
prohibited. flood-resistant materials, and used only
for storage.
Page 157
134 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
g. Within Zones VI-V30, VE, and V, when an i. The danger that materials may be
accessory building is placed, the design swept onto other lands to the injury
professional must determine the effect of others;
that debris from the accessory building ii. The danger to life and property due
will have on nearby buildings. If the to flooding or erosion damage;
accessory building is large enough that
iii. The susceptibility of the proposed
its failure could create damaging debris
facility and its contents to flood
or divert flood flows, it must be elevated
damage and the effect of such
above the base flood elevation plus two
damage on the individual owner;
feet.
iv. The importance of the services
9. Critical facilities. In order to prevent potential
provided by the proposed facility to
flood damage to certain facilities that would
the community;
result in serious danger to life and health,
widespread social or economic dislocation, v. The necessity to the facility of a
no new critical facility shall be located within waterfront location, where applicable;
any area of special flood hazard, or within vi. The availability of alternative
any 500-year flood zone shown as a B Zone locations for the proposed use which
or a Shaded X Zone on the Community's are not subject to flooding or erosion
Flood Insurance Rate Maps. damage;
F. Variance procedure. vii. The compatibility of the proposed
use with existing and anticipated
1. Appeals board.
development;
a. The Zoning Board of Appeals as
viii. The relationship of the proposed
established by the City of Lackawanna
use to the comprehensive plan and
shall hear and decide appeals and
floodplain management program of
requests for variances from the
that area;
requirements of this section.
ix. The safety of access to the property
b. The Zoning Board of Appeals shall hear
in times of flood for ordinary and
and decide appeals when it is alleged
emergency vehicles;
there is an error in any requirement,
decision, or determination made by the x. The costs to local governments
local administrator in the enforcement or and the dangers associated with
administration of this section. conducting search and rescue
operations during periods of flooding;
c. (c) the Zoning Board of Appeals may
appeal such decision to the Supreme xi. The expected heights, velocity,
Court pursuant to Article 78 of the Civil duration, rate of rise and sediment
Practice Law and Rules. transport of the floodwaters and the
effects of wave action, if applicable,
d. In passing upon such applications, the
expected at the site; and
Zoning Board of Appeals, shall consider
all technical evaluations, all relevant
factors, standards specified in other
sections of this section and:
Page 158
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 135 OF 148
xii. The costs of providing governmental c. Variances may be issued by a community
services during and after flood for new construction and substantial
conditions, including search and improvements and for other development
rescue operations, maintenance and necessary for the conduct of a
repair of public utilities and facilities functionally dependent use provided that:
such as sewer, gas, electrical, and
i. The criteria of subparagraphs 1, 4, 5,
water systems and streets and
and 6 of this Section are met; and
bridges.
ii. The structure or other development is
e. Upon consideration of the factors of protected by methods that minimize
Section 6.1(4) and the purposes of this flood damages during the base flood
section, the Zoning Board of Appeals may and create no additional threat to
attach such conditions to the granting public safety.
of variances as it deems necessary to
further the purposes of this section. d. Variances shall not be issued within
any designated floodway if any increase
f. The local administrator shall maintain the
in flood levels during the base flood
records of all appeal actions including
discharge would result.
technical information and report any
variances to the Federal Emergency e. Variances shall only be issued upon a
Management Agency upon request. determination that the variance is the
minimum necessary, considering the
2. Conditions for variances. flood hazard, to afford relief.
a. Generally, variances may be issued f. Variances shall only be issued upon
for new construction and substantial receiving written justification of:
improvements to be erected on a lot of
one-half acre or less in size contiguous i. A showing of good and sufficient
to and surrounded by lots with existing cause;
structures constructed below the base ii. A determination that failure to
flood elevation, providing items (i-xii) in grant the variance would result in
Section 6.1(4) have been fully considered. exceptional hardship to the applicant;
As the lot size increases beyond the and
one-half acre, the technical justification
iii. [A determination that the granting of
required for issuing the variance
a variance will not result in increased
increases.
flood heights, additional threats to
b. Variances may be issued for the repair or public safety, extraordinary public
rehabilitation of historic structures upon expense, create nuisances, cause
determination that: fraud on or victimization of the public
i. The proposed repair or rehabilitation or conflict with existing local laws or
will not preclude the structure's ordinances.
continued designation as a "Historic
structure"; and
ii. The variance is the minimum
necessary to preserve the historic
character and design of the structure.
Page 159
136 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
g. Notification.
§11-4 ZONING PERMITS.
i. Any applicant to whom a variance is
A. Authorization. The City Zoning Officer is
granted for a building with the lowest
authorized to approve or disapprove zoning
floor below the base flood elevation
permit applications in accordance with the
shall be given written notice over the
standards outlined in this chapter.
signature of a community official that:
B. Application. It shall be unlawful to commence the
(A) The issuance of a variance to excavation for, or the construction of, any building
construct a structure below or structure, including accessory buildings, or
the base flood level will result to commence the moving or alteration of any
in increased premium rates for building structure, including accessory buildings,
flood insurance up to amounts as until the City Zoning Officer has issued a zoning
high as $25 for $100 of insurance permit for such work.
coverage; and
C. Permit Application Requirements. In order for
(B) Such construction below the a Zoning Permit application to be deemed
base flood level increases risks complete it shall include the following at a
to life and property. minimum:
II. Such notification shall be maintained
1. The property address and SBL
with the record of all variance actions
as required in Section 4.4-8 of this 2. The contact information of the property
section. owner and applicant (if different than the
property owner).
§11-3 BUILDING PERMITS 3. A site plan that illustrates the proposed
change. At a minimum the site plan drawing
A. Applications for building permits shall be
shall show the following,
submitted to the City of Lackawanna Code
Enforcement Officer in accordance with Chapter d. A property survey that shows all property
75, Building Construction. lines and easements,
B. No building permit shall be issued unless the e. A site plan that shows the locations of all
applicant has received a zoning permit from existing and proposed buildings, roads,
the City Zoning Officer in accordance with the parking areas, and landscaping as well as
provisions of this chapter. all natural features (wetlands, floodplains,
etc.).
§11-3 BUILDING PERMITS D. Procedure.
A. Applications for building permits shall be 1. Applications for zoning permits shall be
submitted to the City of Lackawanna Code submitted to the City Zoning Officer.
Enforcement Officer in accordance with Chapter
2. If the proposed excavations, construction,
75, Building Construction.
alterations or moving as set forth in the
A. No building permit shall be issued unless the application are in conformity with the
applicant has received a zoning permit from provisions of this chapter, the Zoning
the City Zoning Officer in accordance with the Officer may issue a zoning permit for such
provisions of this chapter. excavation, construction, alteration or
moving. The issuance of a zoning permit shall
in no case be construed as a waiver for any
provision of this chapter that does not fall
under the subject of the zoning permit.
Page 160
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 137 OF 148
3. If a zoning permit is denied, the Zoning 2. Where the use is identified in the provisions
Officer shall state such refusal, in writing, of this chapter as requiring site plan review,
with the cause and shall immediately mail the application shall be forwarded to the
notice of such refusal to the applicant at the Planning and Development Board for
address indicated on the application. approval in accordance with the provisions of
4. Each order, requirement, decision, this chapter.
interpretation or determination of the Zoning 3. Site plan review shall not be required for
Officer shall be filed in the Zoning Officer's the development of two or fewer single- or
office within five business days from the day two-family lots.
its is rendered and shall be a public record. 4. The addition of residential units to a
5. Any applicant, after being denied zoning mixed-use development shall be regulated by
permit, may appeal the Zoning Officer's the provisions for residential development
findings to the Zoning Board of Appeals for 5. The following table outlines the level of
an interpretation or, if appropriate, a variance. review required.
An appeal shall be taken within 60 days after
C. Procedure.
the filing of any order, requirement, decision,
interpretation or determination of the Zoning 1. Before submitting an application for
Officer. Where an appeal is requested, the development approval, it is required that
Zoning Officer shall notify and forward all each petitioner schedule a pre-application
necessary supporting information to the conference with the Zoning Officer, as
Zoning Board of Appeals Secretary. applicable, to discuss the procedures,
6. A zoning permit shall become void 12 months standards and regulations required for
from the date of issuance unless substantial development approval in accordance with
progress has been made by that date on the the provisions of this Chapter. Applicants
project described therein. shall provide the following materials at the
pre-application conference:
§11-5 SITE PLAN REVIEW. a. A draft plan that shows the locations of all
A. Authorization. The Planning and Development existing and proposed buildings, roads,
Board is authorized to review and approve, parking areas, and landscaping as well as
approve with modifications or conditions or all natural features (wetlands, floodplains,
disapprove site plans in accordance with the etc.)
standards outlined in this chapter. b. An accurate property survey that
B. Applicability. Site plan review and site plan demonstrates the property boundaries,
approval by the City of Lackawanna Planning and easements, adjacent streets, topography,
Development Board shall be required for all uses, and other pertinent features.
buildings and structures that require site plan
approval as outlined in this chapter. Fees outlined
and adopted by the City of Lackawanna will apply
to all site plan reviews.
1. No construction or site improvement may
commence until site plan approval or a
zoning permit, when required, has been
granted,
Page 161
138 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
TYPE OF DEVELOPMENT SITE PLAN REVIEW ZONING PERMIT
RESIDENTIAL
Up to 4 Residential Units
Proposed construction of 3 or 4 residential uses (not on individual lots) ✓
5 or More Residential Units
Proposed construction of 5 or more residential units (not on individual lots) subdivision approval* ✓
SEQRA Type I Actions
Any proposed residential development classified as a Type 1 action per 6 NYCCR Part 617 ✓
Addition of Accessory Structures
Proposed addition of accessory structures greater than 144 SF (garages, sheds, decks, etc.) ✓
Modifications to parking, loading, or stacking ✓
NON-RESIDENTIAL
Addition of less than 750 SF ✓
Proposed addition of between 750 and 4000 SF of gross floor area closer than 100 feet to a
residential property boundary, as measured from the limit of work shown on the site plan drawing. If ✓
no limit of work is shown, the closest property boundary shall be used.
Proposed addition of between 750 and 4000 SF of gross floor area and greater than 100 feet from a
residential property boundary, as measured from the work limit show on the site plan drawing. If no ✓
limit of work is shown, the closest property boundary shall be used.
Proposed addition of more than 4000 SF ✓
Modifications to parking, loading, or stacking ✓
SEQRA Type I Actions
OTHER
Proposed modification to a previously approved site plan where the proposed scope is not included
✓
in any of the other categories of this section
Page 162
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 139 OF 148
2. Application. Copies of a site plan and D. Site plan contents. A complete site plan
supplementary information along with application shall include or be accompanied by
the complete application and appropriate the following information, as deemed appropriate
fees for site plan review shall be submitted by the Zoning Officer. During a preapplication
to the City Zoning Officer in a quantity to meeting the Zoning Officer may waive the
be determined by the City Zoning Officer requirements set forth in this section as deemed
for distribution to the City Engineer, Fire appropriate but may not waive the requirement
Department, Police Department, Planning that a stormwater pollution prevention plan
and Development Board and other review be submitted where required. The plan shall
agencies as required (ex. County Planning be prepared by a licensed engineer, architect,
Department, New York State Department of landscape architect or surveyor.
Transportation where project is on or affects
1. Complete application form
state highways).
2. Title of drawings, including name of the
3. Who May Submit Applications. Applications
development, name, telephone number and
shall only be accepted from persons
address of applicant and the name of the
having the legal authority to submit such
person who prepared the drawing.
applications. In general, applications shall be
made by the owners or lessees of property, 3. Key plan, north point, professional stamp,
or persons who have contracted to purchase scale (1 inch = 20 feet or other appropriate
property contingent upon their ability to scale) and date.
acquire the necessary approval under this 4. Zoning, land use and ownership of
Zoning Ordinance. surrounding and adjacent properties,
4. Review. Staff and other review agencies including all structures on adjacent and
shall review and notify the Planning surrounding properties.
and Development Board in writing of its 5. A boundary survey of the proposed
comments or recommendations at least development plotted to scale and including
seven calendar days prior to the scheduled its acreage, a legal description thereof and
Planning and Development Board meeting detailing existing topographic features,
regarding the application. The Planning including contours, spot elevations, large
and Development Board shall review the trees, buildings, structures, streets, property
application, site plan and supporting data. lines, utility easements, rights-of-way and
In unique or large-scale cases, the Planning land use.
and Development Board may retain private,
6. Layout and number of lots.
expert consultants to assist in the review.
7. All lot dimensions, including, but not limited
to, lot frontage, lot area, building coverage, lot
coverage, front yard, side yard, rear yard, and
building heights.
8. All improvement dimensions, including, but
not limited to, access roads, streets, street
names, snow removal/storage areas, parking
area, sidewalks, buildings, drains, culverts,
retaining walls, fences, etc.
Page 163
140 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
9. Existing roadways, driveways, sidewalks and 20. Landscape plan indicating location, type
pedestrian paths immediately adjoining and and size of existing trees and vegetation and
opposite from the proposed site, including those to be preserved or removed as well as
names. location, type and size of trees, vegetation,
10. Location and dimensions of all parking, amenities to be provided, tree staking, plant
loading and stacking areas. installation, soil preparation details and all
other applicable installation details and
11. Paving, including typical cross sections and calculation of the total landscaped area.
profiles of proposed streets, crosswalks,
pedestrian walkways and bikeways. 21. Location and proposed development of all
buffer areas, including existing vegetative
12. Location, proposed use, height, building cover.
elevations, floor plans and finished elevations
of all structures. 22. Location, design and illumination field of all
pools, ponds, water features, lighting fixtures,
13. Colors, materials, dimensions, access and fences and walls.
roof top plans of all structures.
23. Location, dimension, design and construction
14. Location and proposed development type of all signs.
of all open spaces, including parks and
playgrounds. 24. Required screening and enclosures.
15. Existing and proposed watercourses 25. Location of public transit stops and shelters.
16. Drainage plan showing existing and finished 26. Proposed easements, restrictions, covenants
grades, stormwater management plan, and provisions for homeowners' associations
impact of the watershed and any slopes and common ownerships.
greater than 5%. The best management 27. Location, design and construction of all
practices employed to mitigate the impacts energy distribution facilities, including
of stormwater management shall be set electrical, gas, solar and wind energy.
forth in detail. A copy of the storm drainage 28. Identification of any state or county permits
analysis shall be submitted for review when required for the project's execution and
required by the City Engineer. documentation of application for and
17. Water supply plan, including existing and approval status of all necessary permits from
proposed location of fire hydrants, fire lanes, state and county officials.
size of service line and a note indicating 29. Additional supporting data or plans
backflow preventor. deemed necessary and relevant to carry
18. A description of the method of securing out the Planning and Development Board's
public water and location, design and responsibility for site plan review upon
construction materials of such facilities. notification to the proposed developer
19. Sewage disposal method and location, and their decision to proceed with the
design and construction materials of such application.
facilities. 30. A stormwater pollution prevention plan
(SWPPP), if required for the proposed
development under Article XII of this chapter,
together with the recommendation of the
Stormwater Management Officer to approve,
approve with modifications, or disapprove
the SWPPP pursuant to § 230-93B of this
chapter
Page 164
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 141 OF 148
E. Action By the Planning Board. Within 62 days of iii. The use will not cause substantial
the public hearing, or receipt of the application injury to the value of the other
if no public hearing is held, the Board shall, at a property in the neighborhood where
regular or special meeting: it is located.
1. Approve upon a finding that: iv. The use will be compatible with
adjoining development and the
a. The proposed site plan is consistent
character of the neighborhood where
with the goals and objectives of the
it is located.
Comprehensive Plan, and
b. The proposed site plan is consistent 3. Disapprove the site plan.
with the intent, objectives and specific a. The Planning and Development Board
requirements of this chapter, and shall file a full written record of its
c. Adequate services and utilities will be minutes and decision with all documents
available prior to occupancy, and pertaining to the case with the City Clerk,
with a copy to the Zoning Officer, and
d. The site plan is consistent with all shall mail a copy to the applicant. Where a
applicable laws, and site plan is denied approval, the Planning
e. If a stormwater pollution prevention plan and Development Board shall state its
(SWPPP) was submitted in accordance reasons for disapproval in writing.
with § 230-71D(35), the site plan and b. Costs incurred by the Planning and
SWPPP comply with the requirements Development Board for consultation
of Article XII of this chapter. [Added fees or other extraordinary expenses in
2-5-2008] connection with the review of a proposed
2. Approve with modifications or conditions site plan shall be charged to the applicant.
limiting the use and occupancy of the land or The Board shall notify the applicant
proposed buildings consistent with the intent prior to it incurring any extraordinary
or purposes of this chapter; expenses and provide an opportunity for
the applicant to remove its application to
a. Criteria for review and recommendations.
avoid the expenses.
In considering and acting upon site plan
reviews and approvals, the Planning and 4. Expiration. Site plan approvals shall
Development Board shall consider and expire after 12 months unless a successful
may prescribe conditions as necessary to application for a building permit has been
ensure: made within that period. One six-month
extension may be granted by the Planning
i. The development complies with all
and Development Board to obtain the
applicable regulations of this chapter
building permit.
and all other applicable laws.
5. Alterations. Property owners wishing to
ii. The use is designed, located and
make any changes in an approved site plan
proposed to be operated so the
shall submit a revised site plan review and
public health, safety, welfare and
approval in accordance with the table in
convenience will be protected.
§11-5.
Page 165
142 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
6. Appeal. Any person aggrieved by any
decision of the Planning and Development
§11-7 USE AND AREA
Board may apply to the Supreme Court
VARIANCES
for a review under Article 78 of the Civil A. Authorization. The Zoning Board of Appeals is
Practice Law and Rules in accordance with authorized to approve, approve with conditions or
General City Law § 27-a, Subdivision 11. Such disapprove area and use variances in accordance
proceedings shall be instituted within 30 with the standards outlined in this chapter.
days after the filing of a decision in the office
B. Applications. On an appeal from an order,
of the City Clerk.
requirement, decision or determination of the
7. Security as condition of approval. As an Zoning Officer or any other administrative official
alternative to the installation of required charged with the enforcement of this chapter,
infrastructure and improvements, the where it is alleged that there are practical
Planning and Development Board may difficulties or unnecessary hardships in the
require, as a condition of site plan approval, way of carrying out the strict application of
the property owner to furnish cash, an any provision of this chapter, the Zoning Board
irrevocable letter of credit, a performance of Appeals may grant a variance in the strict
bond or other security sufficient to cover the application of such provision in accordance with
full cost of the same. this article.
C. Procedure.
§11-6 NOTICE AND
PUBLIC HEARING 1. Preapplication conference. A preapplication
REQUIREMENTS. conference shall be held between the City
Zoning Officer and the applicant prior to
A. Planning Board Discretion. The Planning and the preparation and submission of a formal
Development Board, by majority vote, may application to the Zoning Board of Appeals to
require a public hearing for an application under determine the basis for the variance request,
review. If a public hearing is required, it shall be advise the applicant on procedure, and to
conducted within 62 days of receipt of a complete identify information necessary for a complete
application. variance application package.
B. Mailing Requirements. The Planning and 2. Application.
Development Board shall provide written notice
a. A complete application for variance shall
by mail of said hearing to the applicant at least
be submitted to the Zoning Officer.
10 days before said hearing and shall give public
notice to said hearing in the official newspaper of b. A complete application must include,
the City at least five days prior to the date thereof. i. The name and address of the
Where required under General Municipal Law § applicant. If the applicant is different
239-m the Board shall mail notice of the hearing from the property owner, a signed
to the County Planning Board at least 10 days affidavit by the record owner granting
prior to the hearing. permission to file the application will
be required
ii. The address of the subject property
and the zoning district it is in,
Page 166
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 143 OF 148
iii. A description of the present 4. Decision.
improvements and proposed a. Following the public hearing, the Zoning
changes to be made under the Board of Appeals shall render a decision
application, indicating the size of of approval, conditional approval, or
such proposed improvements, denial.
material and general construction
b. The Zoning Board of Appeals shall file
thereof.
a full written record of its minutes and
iv. A plot plan of the real property to be decision with the City Clerk, with a copy
affected indicating the lot and size of to the Zoning Officer and shall mail a copy
improvements thereon and proposed to the applicant. Where an application is
to be erected thereon. denied, the record shall state the reasons
3. Public hearing. for denial.
a. Within 62 calendar days of receipt of a c. Variance application approvals shall
complete application the Zoning Board of expire if the applicant fails to obtain any
Appeals shall hold a public hearing. necessary building permit or to comply
with the conditions of said authorization
b. Notices of the public hearing shall be
within six months from the date of
mailed at least five calendar days prior
authorization thereof.
to the date of the hearing to the parties,
property owners within 1,500 feet from d. Costs incurred by the Planning and
the property line, to such other property Development Board for consultation
owners as the Chairman of the Zoning fees or other extraordinary expenses in
Board of Appeals may direct, to the connection with the review of a proposed
regional state park commission having site plan shall be charged to the applicant.
jurisdiction over any state park or e. Appeals.
parkway within 500 feet of the property
1. The Zoning Board shall refuse to hold
affected by such appeal and to the County
further hearings on a denied application or
Planning Board, as required by § 239-m of
one substantially similar by the applicant
the General Municipal Law.
for a period of one year unless the Zoning
c. The public hearing shall be advertised at Board of Appeals shall find that changed
least once in the official City paper or in a conditions have occurred which warrant a
newspaper of general circulation at least reconsideration. Such a rehearing would be
five calendar days before the hearing. allowable only upon a motion initiated by
[Amended 10-19-2016] a member of the Zoning Board of Appeals
d. The Zoning Board of Appeals may adjourn and adopted by the unanimous vote of
the hearing for a reasonable period to the members present, but not less than a
deliver notice to such other property majority of all members.
owners as it decides may be interested in 2. Any person aggrieved by any decision of
said application or appeal. the Zoning Board of Appeals may apply to
the NYS Supreme Court for a review under
Article 78 of the Civil Practice Law and Rules.
Such proceedings shall be instituted within
30 days after the filing of a decision in the
office of the City Clerk.
Page 167
144 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
D. Criteria for use variance approvals. The Zoning
Board of Appeals may grant a use variance,
§11-8 AMENDMENTS.
based upon unnecessary hardship, where the A. Authority.
applicant has established all of the following
1. The regulations, restrictions and boundaries
factors:
established by this chapter may be amended,
1. The applicant cannot realize a reasonable supplemented, changed or repealed to meet
return, provided that lack of return is the growing and changing needs of the City
substantial as demonstrated by competent of Lackawanna.
financial evidence; 2. The City Council, subject to the provisions
2. The alleged hardship relating to the property and restrictions contained herein, on its own
in question is unique, and does not apply motion, on petition or on recommendation
to a substantial portion of the district or of the Planning and Development Board,
neighborhood; by amendment, may supplement, repeal, or
change the regulations and provisions of this
3. The requested use variance, if granted,
chapter.
will not alter the essential character of the
neighborhood; and B. Procedure.
4. The alleged hardship has not been 1. Application.
self-created.
a. A petition to amend, change or
E. Criteria for area variance approvals. The Zoning supplement the text of this chapter or
Board of Appeals, in the granting of an area any zoning district, as designated on the
variance, shall grant the minimum variance that Zoning Map, shall be filed with the City
it shall deem necessary and adequate and at the Clerk on forms obtained by the Zoning
same time preserve and protect the character Officer and transmitted to the City
of the neighborhood and the health, safety and Council. The project's status under the
welfare of the community. The Zoning Board State Environmental Quality Review Act
of Appeals may grant an area variance, upon a shall be determined at this time.
consideration of the following:
b. The petitioner shall submit a conceptual
1. Whether an undesirable change will plan showing the extent, location and
be produced in the character of the character of proposed structures,
neighborhood or a detriment to nearby improvements and uses as well as the
properties will be created by the granting of overall development density.
the area variance;
2. Planning and Development Board review.
2. Whether the benefit sought by the applicant Each proposed amendment, except
can be achieved by some method feasible for those initiated by the City Planning and
the applicant to pursue, other than an area Development Board, shall be submitted to
variance; the Planning and Development Board for an
3. Whether the requested area variance is advisory report and recommendation prior to
substantial; the public hearing held by the City Council.
4. Whether the proposed variance will have
an adverse effect or impact on the physical
and environmental conditions in the
neighborhood or district; and,
5. Whether the alleged difficulty was
self-created.
Page 168
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 145 OF 148
3. Planning and Development Board c. A written notice of any proposed change
Review Criteria. In making a favorable or amendment affecting property within
recommendation the Planning and 500 feet of the boundary of any state park
Development Board shall take into shall be given to the regional state park
consideration and make findings based on commission having jurisdiction over such
the following: facilities at least 10 days prior to the date
a. The proposed zoning designation or of such hearing. At the public hearing, full
language is generally consistent with the opportunities to be heard shall be given to
policies of the adopted Comprehensive any citizen and all parties in interest.
Plan and this Chapter; d. Decision.
b. Whether or not there are adequate f. An amendment shall be effected by a
services or utilities available or proposed simple majority vote of the City Council
to be made in the construction of the except that the favorable vote of at least
development; 75% of the members of the City Council
c. Compatibility with the present zoning shall be required for the passage of an
and conforming uses of the nearby amendment which is protested by the
properties and with the character of the owners of 20% or more of the area of
neighborhood; land included in the proposed change or
the land within 100 feet from the street
d. Suitability of the subject property for the
frontage of such land.
uses permitted by the current versus the
proposed district; and, e. The City Council shall file a full written
record of its minutes and decision with
e. Whether the proposed change tends to all documents pertaining to the case
improve the balance of uses or meets a with the City Clerk, with a copy to the
specific demand within the city. Zoning Officer, and shall mail a copy to
4. Public hearing. the applicant. Where an amendment is
denied approval, the City Council shall
a. Following the receipt of a
state its reasons for disapproval in writing.
recommendation by the Planning and
Development Board, the City Council
shall hold a public hearing for the §11-9 SPECIAL USE PERMITS.
proposed amendment within 62 days of A. Applicability
the Planning and Development Board's
1. Special uses within the zoning districts are
recommendation.
generally considered to be uses which are
b. The public hearing shall be advertised appropriate in a particular zoning district but
at least once in the City of Lackawanna because of their potential for incompatibility
official newspaper at least 10 days with adjacent uses require individual review
before the hearing. The notice shall and may require the imposition of conditions
state the general nature of the proposed to assure the appropriateness of the use in a
amendment in such reasonable detail as particular zoning district.
will give adequate notice of the subject
2. A special use permit shall be required in
of the hearing and shall name the place
accordance with the district use tables in
or places where copies of the proposed
Section 4-1.
amendment may be examined.
Page 169
146 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
3. The Planning and Development Board shall 5. (The Planning and Development Board
hear and decide all applications for special shall have the authority to impose such
use permits in accordance with § 27-b of reasonable conditions and restrictions as
NYS General City Law, with the exception of are directly related to and incidental to the
Solar Energy Systems. proposed special use permit. Upon approval
4. The City Council shall hear and decide of a special use permit, any such conditions
all applications for special use permits in shall be met in connection with issuance of
accordance with §27-b of NYS General City permits by applicable agents and officers of
Law for Solar Energy Systems. the City.
B. Application Requirements E. Action by the City Council.
a. An application shall not be considered 1. Following completion of Planning and
complete until a SEQR determination Development Board review of a request
under 6 NYCCR Part 617 Environmental for a Tier III Solar Energy System, the City
Quality Review, as amended, can be Council shall schedule a public hearing
made. and give notice in accordance with §11-6,
Notice and Public Hearing Requirements. A
C. Action by the Zoning Enforcement Officer. The further public notice shall be published and
Zoning Enforcement Officer shall prepare a report paid for by the petitioner when a hearing
that reviews the request for a special use permit. postponement is requested by the petitioner.
D. Action by the Zoning Board of Appeals. 2. If the petitioner does not request a public
1. Within 62 days following receipt of the hearing before the City Council as provided
application, the Planning and Development for by this Chapter within six months after
Board shall schedule a public hearing and the Planning and Development Board makes
give notice in accordance with §11-6, Notice its report of a request for a Tier III Solar
and Public Hearing Requirements. Energy System, the petition shall be deemed
withdrawn.
2. After review of the special use permit
application and the public hearing, the 3. Upon request, the City Council shall hold
Planning and Development Board shall make the public hearing and render a decision
written findings of approval, approval with on a request for a Tier III Solar Energy
modifications or conditions, or denial. System within 62 days thereafter. The time
within which the City Council shall render a
3. After conducting the public hearing, the
decision may be extended by mutual consent
Planning and Development Board shall
of the petitioner and the City Council.
render a decision within 62 days thereafter.
The time within which the decision shall 4. The City Council may approve, approve with
be rendered may be extended by mutual modifications, or disapprove the application
consent of the petitioner and the Board. for a special use permit for a Tier III Solar
Energy System.
4. The Planning and Development Board may
approve, approve with modifications, or 5. The City Council shall have the authority
disapprove the application for a special use to impose such reasonable conditions and
permit restrictions as are directly related to and
incidental to the proposed special use permit
for a Tier III Solar Energy System. Upon
approval of a special use permit, any such
conditions shall be met in connection with
issuance of permits by applicable agents and
officers of the Town.
Page 170
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 147 OF 148
F. Review Criteria. In rendering a decision, the I. Renewal of Special Use Permits with Specific
Planning and Development Board and the City Time Periods. Special use permits that have been
Council, where applicable, shall consider and issued for specific time periods are subject to
make findings that the proposed use: review for compliance with all of the conditions
imposed at the time of approval of the initial
1. Will be generally consistent with the policies
permit. Following a public hearing on the matter,
of the Comprehensive Plan;
the Planning and Development Board or City
2. Meets any specific criteria set forth in this Council, where applicable, may deny a renewal
Chapter; of a special use permit when any of the following
3. Will be compatible with existing uses apply:
adjacent to and near the property; 1. The petitioner has failed to comply with
4. Will be in harmony with the general purpose one or more of the conditions of the prior
of this Chapter; approval;
5. Will not tend to depreciate the value of 2. Substantial new issues regarding the permit
adjacent property; conditions during the operation of the use
6. Will not create a hazard to health, safety or have arisen;
the general welfare; 3. The general requirements of this Zoning
7. Will not alter the essential character of the Ordinance have not been met; and,
neighborhood nor be detrimental to the 4. There are changes in the area or
neighborhood residents; and, neighborhood which would be incompatible
8. Will not otherwise be detrimental to the with the special use.
public convenience and welfare. J. Period of Validity.
G. Conditions on Special Use Permits. The Planning 1. A special use permit shall become null
and Development Board or the City Council, and void twelve months after the date on
where applicable, may impose such conditions which it was issued unless the special use is
upon the premises benefited by a special use established within twelve months of the date
permit as may be necessary to prevent or of Planning and Development Board or City
minimize adverse effects upon other property Council approval.
in the neighborhood, including limitations on
2. A special use permit shall become null
the time period for which the permit is granted.
and void upon a finding by the Zoning
Such conditions shall be expressly set forth in the
Enforcement Officer that any of the
resolution authorizing the special use permit.
conditions in the permit have been violated.
H. Notice of Decision. The decision of the Planning
3. A special use permit shall be deemed to
and Development Board or City Council, where
authorize only the particular use or its
applicable, shall be filed in the City Clerk’s Office
operation for which it was issued, and such
within five business days after the decision is
permit shall automatically expire and cease
rendered, and a copy mailed to the petitioner.
to be of any force or effect if such use shall,
for any reason, be discontinued for a period
of six consecutive months.
Page 171
148 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning
§11-10 ENFORCEMENT AND E. The City of Lackawanna may pursue each
violation as a civil remedy for injunction or as
PENALTIES. criminal prosecution; each shall be mutually
A. No structure shall hereafter be constructed, exclusive remedies. Nothing herein contained
located, extended, converted or altered and shall prevent the City of Lackawanna from taking
no land shall be excavated or filled without full such other lawful action as necessary to prevent
compliance with the terms of this chapter and or remedy an infraction.
any other applicable regulations. F. Where appropriate, notification of noncompliance
B. Whenever a violation of this chapter occurs, any will be forwarded to appropriate government
person may file a written complaint with the enforcement agencies including the Federal
Zoning Officer who shall properly record such Emergency Management Agency.
complaint and immediately investigate and report
to the City Council. Complaints regarding the §11-11 FEES
State Uniform Building Code shall be filed with
A. Special permit fees and site plan review fees shall
the City Director of Development.
be collected and paid according to the following
C. Whenever such persons shall have been fee structure as may be amended by the Council.
duly notified by the City Council of the City of
B. Special use permit/use and area variances/
Lackawanna, New York, or its duly authorized
zoning permit/zoning classification change: $100.
official, or the Zoning Officer or by service or
summons in a prosecution or in any other way C. Site plan review.
that they are committing such violation of this
chapter, each week that they shall continue such
violation after such notification shall constitute AREA (ACRES) FEE
a separate offense punishable by a like fine or
penalty. Less than 0.5 $50
D. Any person, firm or corporation who violates, 0.5 to 1.0 $75
disobeys, neglects or refuses to comply with
1.0 to 2.0 $150
any provision of this chapter shall be guilty of
an offense and upon conviction thereof shall 2.0 to 5.0 $250
be subject to a fine of not more than $350 or
imprisonment for a period of not more than 15 Greater than 5.0 $250, plus $50 per acre.
days, or both, for conviction of a first offense. For
conviction of a second offense within five years
of the first, a fine not less than $350 nor more
than $700 or imprisonment not to exceed 15
days, or both, may be imposed. Upon conviction
of a third or subsequent offense, all of which
were committed within a period of five years, a
fine not less than $700 nor more than $1,000 or
imprisonment for a period not to exceed 15 days,
or both. Such fines or penalties shall be collected
as like fines or penalties are now by law collected.