Town Board Regular Meeting Agenda, Nov 2, 2026 — Agenda (full text)

Town of Hamburg Town Board Nov 2, 2026 111 pages

Page 1

Agenda Natalie E. Nitsche Town Clerk Town Board of the Town of Hamburg November 2, 2026 1. Roll Call 2. Pledge of Allegiance 3. Minutes of Previous Meeting RESOLVED, that the Town Board does hereby approve the minutes of the previous meetings as follows: October 5, 2026 & October 19, 2026 4. Agenda Items 4.1. PROCLAMATION HONORING DR. BRIAN CLEMENCY FOR OUTSTANDING CONTRIBUTIONS TO EMERGENCY MEDICAL SERVICES 4.2. Business/Community Recognition 4.3. Town of Hamburg Data Center Moratorium Adoption Resolution 4.4. Hamburg Woodlawn Gateway Brownfield Opportunity Area (BOA) Plan Lead Agency and Public Hearing Resolution 4.5. Amendments to the 2027 Supervisor's Budget 4.6. Order Establishing the Town of Hamburg Ambulance District 4.7. Urging New York State to Amend Criminal Procedure Law for Repeat Juvenile Offenders and Restore Judicial Discretion 4.8. Out of Town Travel Request – POLICE 4.9. Budget Adjustment - Youth, Recreation, & Senior Services - Town Park 4.10. POLICE / Dog Control Officer – Budget Adjustment/Transfer 4.11. POLICE – Budget Amendment Transfer - Grant 4.12. B&G Budget Transfer 4.13. Highway Budget Adjustment 4.14. B&G Revenue Account Transfer 4.15. ECWA Collection Administrative Fee 1

Page 2

4.16. Amendment of Planning & Engineering Fees 4.17. Twin Willow Water Service 4.18. B&G PAF 4.19. Youth, Recreation, & Senior Services P.A.F. 4.20. POLICE – Agreement with Auctions International 4.21. Cutting and removal of dead trees 4.22. Award Demolition Contractors for 6817 Boston State Rd. 4.23. Award Demolition Contractors for 6310 Southwestern Blvd. 4.24. Award Demolition Contractors for 5272 South Park Ave. 4.25. Ice Rink Equipment Cover Design 4.26. Authorize the Town Supervisor to sign the Proposal with Fisher & Associates 4.27. Authorizing the Non-Renewal of the Contract with Granicus at CARAHSOFT 4.28. Network Equipment Upgrade 5. Public Comment 6. Meeting is adjourned by Supervisor 2

Page 3

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.1. PROCLAMATION HONORING DR. BRIAN CLEMENCY FOR OUTSTANDING CONTRIBUTIONS TO EMERGENCY MEDICAL SERVICES WHEREAS, Dr. Brain Clemency has dedicated more than 25 years to prehospital care, beginning with his career as a firefighter and emergency medical technician, and has continued to advance the delivery of emergency medical services through his leadership, education, clinical practice, and research; and WHEREAS, Dr. Clemency earned his Bachelor of Arts degree in Economics and Pre-Professional Studies from the University of Notre Dame in 2002, followed by a Doctor of Osteopathic Medicine degree and a Master of Business Administration in Health Care Administration in 2006, and WHEREAS, Dr. Clemency continued his medical training at the University at Buffalo, completing his residency in Emergency Medicine in 2009 and a fellowship in Emergency Medical Services in 2010, and is board-certified in both Emergency Medicine and Emergency Medical Services; and WHEREAS, Dr. Clemency serves in numerous leadership and academic roles at the University at Buffalo Jacobs School of Medicine and Biomedical Sciences, including Professor with Tenure in Emergency Medicine, Interim Vice Chair for Research, and Vice Chair for Academic and Faculty Affairs; and WHEREAS, Dr. Clemency has contributed to the health and safety of the Western New York community through his work as an attending emergency physician at Erie County Medical Center and as an emergency physician for the Buffalo Bills, while also advancing the field of prehospital care through research, education, mentorship, and professional leadership at the local, regional, and national levels; and WHEREAS, Dr. Clemency serves as Subject Matter Expert and Medical Director for the Town of Hamburg Emergency Services, providing medical expertise and leadership that support the delivery of emergency medical services to the residents of Hamburg, while also serving as Associate Medical Director for Rural/Metro Medical Services of Western New York and providing medical direction to local volunteer EMS agencies; and WHEREAS, Dr. Clemency has been awarded the Award for Outstanding Contribution in EMS by the American College of Emergency Physicians (ACEP), which recognizes an ACEP member who has made an outstanding contribution to emergency medical services of national significance or application, honoring his impact on the advancement of EMS and his commitment to improving prehospital emergency care; and 3

Page 4

WHEREAS, Dr. Clemency’s longstanding commitment to excellence, innovation, and the advancement of emergency medical services exemplifies the highest standards of professionalism and public service and has made a lasting impact on the medical community and the lives of those served. NOW, THEREFORE, BE IT PROCLAIMED, that the Town of Hamburg hereby recognizes and honors Dr. Clemency for more than 25 years of dedicated service, outstanding leadership, and significant contributions to emergency medical services, medical education, and research; and BE IT FURTHER PROCLAIMED, that the Town of Hamburg congratulates Dr. Clemency on being the recipient of this distinguished national recognition and for his continued commitment to advancing emergency medical services and protecting the health and well-being of our community. In Witness Whereof, we have caused the seal of the Town of Hamburg to be affixed this 2nd day of November 2026. ____________________________________ Elizabeth Farrell Lorentz, Supervisor Daniel Kozub, Deputy Supervisor Frank Bogulski, Councilmember Lynne Dixon, Councilmember Nick Ortiz, Councilmember 4

Page 5

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.2. Business/Community Recognition 5

Page 6

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.3. Town of Hamburg Data Center Moratorium Adoption Resolution WHEREAS, the rapid development of large-scale data centers and artificial intelligence computing facilities presents significant land-use and infrastructure considerations, including electrical and water demands, noise, backup power generation, environmental impacts, and compatibility with surrounding properties; and WHEREAS, although the Town of Hamburg currently regulates artificial intelligence data centers under its zoning laws, the Town Board wishes to further review those regulations in light of the rapidly evolving nature and scale of these facilities; and WHEREAS, a one-year pause in the approval and development of new large-scale data centers would provide the Town with an opportunity to study these issues and determine whether additional regulations are necessary to protect Town residents, infrastructure, natural resources, and neighboring properties; and WHEREAS, the Code Review Committee needs time to update these zoning regulations related to data centers, and is recommending that the Town of Hamburg adopt a moratorium while these Codes are being updated; and WHEREAS, the Town has introduced the following proposed Local Law, entitled “A Local Law of the Town of Hamburg to Establish a Temporary One-Year Moratorium on Applications, Approvals, Permits and Construction Related to Data Centers Within the Town of Hamburg” and presented a copy to each member of the Board , which reads as follows: Be it enacted by the Town Board of the Town of Hamburg as follows: Section 1. Title: A Local Law of the Town of Hamburg to Establish a Temporary One-Year Moratorium on Applications, Approvals, Permits and Construction Related to Data Centers Within the Town of Hamburg. 6

Page 7

Section 2. Legislative Authorization: This Local law is authorized by New York State Municipal Home Rule Law Section 10. Section 3: Intent: It is the intent of this local law to establish a temporary one (1) year moratorium on the acceptance, processing, review, consideration, approval, and issuance of applications, permits, certificates, site plan approvals, special use permits, variances, building permits, and other land use approvals relating to the construction, establishment, expansion, enlargement, conversion, or operation of data centers within the Town. Section 4. Definitions: For purposes of the proposed Local Law, a "Data Center" shall mean a building, facility, or group of buildings and facilities used primarily for the housing, operation, management, processing, storage, transmission, or distribution of digital data or electronic information through computer servers, networking equipment, data storage systems, cooling equipment, backup power systems, and related infrastructure, including colocation facilities, cloud computing facilities, artificial intelligence computing facilities, high-performance computing facilities, and similar commercial computing operations. Section 5. Purpose: The purpose of the moratorium is to allow the Town Board sufficient time to study the potential land use, zoning, environmental, infrastructure, public safety, utility demand, noise, traffic, and community character impacts associated with data centers and to determine whether amendments to the Town's Comprehensive Plan, Zoning Law, Site Plan Review Law, and other applicable regulations are necessary to protect the health, safety, and welfare of the residents of the Town. Section 6. Moratorium: The proposed moratorium would remain in effect for a period of one (1) year from its effective date unless earlier modified, extended, or repealed by the Town Board. 7

Page 8

Section 7. Extensions: This Moratorium may be extended by Resolution for such additional periods as the Town Board may determine to be necessary to protect the public health, safety and welfare of the residents of the Town of Hamburg and accomplish the stated purposes and intent of this Local Law. Section 8. Severability: If a court determines that any, clause, sentence, paragraph, subdivision, or part of this local law or the application thereof to any person, firm, corporation, or circumstance is invalid or unconstitutional, the court’s order or judgment shall not affect, impair, or invalidate the remainder of this local law, but shall be confined in its operation to the clause, sentence, paragraph, subdivision, or part of this local law or in its application to the person, individual, firm or corporation or circumstance, directly involved in the controversy in which such judgment or order shall be rendered. Section 9. Effective Date: This Local Law shall become effective immediately, upon filing with the New York State Secretary of State. WHEREAS, the Hamburg Town Board held a public hearing for this proposed moratorium on October 19th, 2026; and WHEREAS, the Hamburg Town Board does hereby declare that the proposed moratorium is a Type II action and requires no further SEQR review pursuant to 6 NYCRR §617.5(c)(36); and WHEREAS, the Hamburg Town Board completed the required 239-m referral of this proposed moratorium to Erie County for their input. NOW THEREFORE BE IT RESOLVED, the Hamburg Town Board hereby enacts this local law and amends Local Law #10 of the year 1986 of the Code of the Town of Hamburg Chapter 280 entitled “Zoning” to provide for the revision of the Town Code as referenced above. 8

Page 9

BE IT FINALLY RESOLVED, this Local Law shall become effective immediately, upon filing with the New York State Secretary of State. ATTACHMENTS: FEAF Part 1 Data Center Moratorium.pdf 9

Page 10

Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies that would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No.” If the answer to the initial question is “Yes,” complete the following sub-questions. If the answer to the initial question is “No,” proceed to the next question. Section F allows the project sponsor to identify and attach additional information. Section G requires the name and signature of the applicant or project sponsor to verify the information in Part 1 is accurate and complete. A. Project and Applicant/Sponsor Information. Name of Action or Project: Town of Hamburg Data Center Moratorium Project Location (describe and attach a general location map): Town of Hamburg Brief Description of Proposed Action (include purpose or need): The proposed action involves the adoption of a temporary one-year moratorium on applications, approvals, permits and construction related to data centers within the Town of Hamburg. Name of Applicant/Sponsor: Telephone: 716-649-6111 Town of Hamburg E-Mail: Address: 6100 South Park Avenue City/PO: State: Zip Code: Hamburg NY 14075 Project Contact (if not same as sponsor; give name and title/role): Telephone: 716-649-2023 Joshua Rogers/Hamburg Planning Department E-Mail: [email protected] Address: 6100 South Park Avenue City/PO: State: Zip Code: Town of Hamburg NY 14075 Property Owner (if not same as sponsor): Telephone: E-Mail: Address: City/PO: State: Zip Code: Page 1 of 15 FEAF 2026 10

Page 11

B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Council, Town Board, 9✔ Yes 9 No Town Board Approval November 2026 or Village Board of Trustees b. City, Town or Village 9 Yes 9 No Planning Board or Commission c. City, Town or 9 Yes 9 No Village Zoning Board of Appeals d. Other local agencies 9 Yes 9 No e. County agencies 9✔ Yes 9 No County 239-m referral October 2026 f. Regional agencies 9 Yes 9 No g. State agencies 9 Yes 9 No h. Federal agencies 9 Yes 9 No i. Coastal Resources. i. Is the project site within a Coastal Area or the waterfront area of a Designated Inland Waterway? 9 Yes 9✔ No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? 9 Yes No ✔ iii. Is the project site within a Coastal Erosion Hazard Area? 9 Yes 9✔ No C. Planning and Zoning C.1. Planning and zoning actions. Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule, or regulation be the 9 ✔ Yes 9 No only approval(s) that must be granted to enable the proposed action to proceed?  If Yes, complete sections C, F and G.  If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans. a. Do any municipally adopted (city, town, village, or county) comprehensive land use plan(s) include the site 9 ✔ Yes 9 No where the proposed action would be located? If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action Yes ✔ No would be located? 9 b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; ✔ Yes No Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; 9 9 or other)? If Yes, identify the plan(s): Erie Canal Heritage Area c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan Yes ✔ No or an adopted municipal farmland protection plan? 9 9 If Yes, identify the plan(s): Page 2 of 15 FEAF 2026 11

Page 12

d. Is the proposed action in a municipality with an adopted comprehensive or individual plan that addresses climate Yes ✔ No change? 9 9 If Yes , identify the elements of the plan that are relevant to the action: 9 9 C.3. Zoning 9 9 a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance? ✔ Yes No If Yes, what is the zoning classification(s) including any applicable overlay district? All zoning districts within Town b. Is the use permitted or allowed by a special or conditional use permit? Yes ✔ No c. Is a zoning change requested as part of the proposed action? Yes ✔ No If Yes, what is the proposed new zoning for the site? C.4. Existing community services. a. In what school district is the project site located? Frontier Central School District, Hamburg Central School District b. What police or other public protection forces serve the project site? Town of Hamburg Police, Village of Hamburg Police, Erie County Sheriff c. Which fire protection and emergency medical services serve the project site? All fire departments within Town of Hamburg d. What parks serve the project site? All parks within Town of Hamburg D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? 9 9 b. a. Total acreage of the site of the proposed action? acres b. Total acreage to be physically disturbed? acres 9 9 c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? acres c. Is the proposed action an expansion of an existing project or use? 9 Yes9 No If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % Units: d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes9 No If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ii. Is a cluster/conservation layout proposed? Yes No iii. Number of lots proposed? iv. Minimum and maximum proposed lot sizes? Minimum Maximum Page 3 of 15 FEAF 2026 12

Page 13

e. Will the proposed action be constructed in multiple phases? 9 Yes 9 No i. If No, anticipated period of construction: months ii. If Yes:  Total number of phases anticipated  Anticipated commencement date of phase 1 (including demolition) month year  Anticipated completion date of final phase month year  Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: 9 9 f. Does the project include new residential uses? Yes No If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family (four or more) 9 9 Initial Phase At completion of all phases 9 9 9 g. Does the proposed action include new non-residential construction (including expansions)? Yes No If Yes, i. Total number of structures ii. Dimensions (in feet) of largest proposed structure: height; width; and length iii. Approximate extent of building space to be heated or cooled: square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any Yes No liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: ii. If a water impoundment, the principal source of the water: Ground water Surface water streams 9 Other 9 specify: iii. If other than water, identify the type of impounded/contained liquids and their source. iv. Approximate size of the proposed impoundment. Volume: million gallons; surface area: acres v. Dimensions of the proposed dam or impounding structure: height; length vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? Yes No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i .What is the purpose of the excavation or dredging? ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?  Volume (specify tons or cubic yards): 9 9  Over what duration of time? iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? Yes No If yes, describe. 9 9 v. What is the total area to be dredged or excavated? acres vi. What is the maximum area to be worked at any one time? acres vii. What would be the maximum depth of excavation or dredging? feet viii. Will the excavation require blasting? Yes No ix. Summarize site reclamation goals and plan: Page 4 of 15 FEAF 2026 13

Page 14

b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ii. Describe how the proposed action would affect that waterbody or wetland, e.g., excavation, fill, placement of structures, or alteration of channels, banks, and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes No If Yes, describe: iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? Yes No If Yes:  acres of aquatic vegetation proposed to be removed:___________________________  expected acreage of aquatic vegetation remaining after project completion:  purpose of proposed removal (e.g. beach clearing, invasive species control, boat access):  proposed method of plant removal:  if chemical/herbicide treatment will be used, specify product(s): v. Describe any proposed reclamation/mitigation following disturbance: c. Will the proposed action use, or create a new demand for water? Yes No If Yes: i. Total anticipated water usage/demand per day: gallons/day ii. Will the proposed action obtain water from an existing public water supply? Yes No If Yes:  Name of district or service area:  Does the existing public water supply have capacity to serve the proposal? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing lines serve the project site? Yes No iii. Will line extension within an existing district be necessary to supply the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project:  Source(s) of supply for the district: iv. Is a new water supply district or service area proposed to be formed to serve the project site? Yes No If, Yes:  Applicant/sponsor for new district:  Date application submitted or anticipated:  Proposed source(s) of supply for new district: v. If a public water supply will not be used, describe plans to provide water supply for the project: vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: gallons/minute. Page 5 of 15 FEAF 2026 14

Page 15

d. Will the proposed action generate liquid wastes? Yes No If Yes: i. Total anticipated liquid waste generation per day: gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): iii. Will the proposed action use any existing public wastewater treatment facilities? Yes No If Yes:  Name of wastewater treatment plant to be used:  Name of district: 9 9  Does the existing wastewater treatment plant have capacity to serve the project? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing sewer lines serve the project site? Yes No  Will a line extension within an existing district be necessary to serve the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project: 9 9 iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? Yes No If Yes:  Applicant/sponsor for new district: 9 9  Date application submitted or anticipated:  What is the receiving water for the wastewater discharge? v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture, recycle or reuse liquid waste: 9 9 e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e., sheet flow) during construction or post construction? If Yes: 9 i. How much impervious surface will the project create in relation to total size of project parcel? Square feet or acres (impervious surface) Square feet or acres (parcel size) ii. Describe types of new point sources. iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water, or off-site surface waters)? 9 9  If to surface waters, identify receiving water bodies or wetlands:  Will stormwater runoff flow to adjacent properties? Yes No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? Yes No 9 9 9 9 9 9 Page 6 of 15 FEAF 2026 15

Page 16

f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes No combustion, waste incineration, or other processes or operations? If Yes, identify: i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) ______________________________________________________________________________________________________ ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ______________________________________________________________________________________________________ iii. Stationary sources during operations (e.g., process emissions, boilers, electric generation, surface coating) ______________________________________________________________________________________________________ g. Will any air emission sources named in D.2.f (above), require an Air Facility Registration, Air State Facility Yes No Permit, Title IV Permit or Title V Permit? If Yes: i. Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration Yes No requirements discussed in 6 NYCRR Part 231? ii. As calculated in the air permit application, the proposed action has the potential to emit:  Tons/year (short tons) of carbon monoxide (CO)  Tons/year (short tons) of oxides of nitrogen (NOx)  Tons/year (short tons) of particulate matter (PM-10, PM-2.5)  Tons/year (short tons) of volatile organic compounds (VOC)  Tons/year (short tons) of sulfur dioxide (SO2) iii. Will emissions of air contaminants from the proposed action described above exceed the corresponding major Yes No source thresholds? iv.Does the proposed action have the potential to emit 10 tons/year or more of any one designated hazardous air Yes No pollutant or 25 tons/year or more of any combination of such hazardous air pollutants (6NYCRR 200.1(ag))? If Yes, provide the total potential to emit hazardous air pollutants in short tons/year: _____________________________ h. Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions, such as carbon dioxide, methane, nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxide equivalents per year at any point in the lifetime of the proposed action (estimated using the carbon dioxide equivalent definition and global warming potentials provided in 6 NYCRR Part 496)? Yes No If Yes: i. Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric): ii. Describe any greenhouse gas capture, control, or elimination measures included in project design: i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes No quarry or landfill operations? If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial Yes No new demand for transportation facilities or services? If Yes: i. When is the peak traffic expected (Check all that apply): Morning Evening Weekend Randomly between hours of to . ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): iii. Parking spaces: Existing Proposed Net increase/decrease iv. Does the proposed action include any shared use parking? Yes No v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: ______________________________________________________________________________________________________________ vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? Yes No vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric Yes No or other alternative fueled vehicles? viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing Yes No pedestrian or bicycle routes? Page 7 of 15 FEAF 2026 16

Page 17

k. Will the proposed action (for commercial or industrial projects only) generate new or additional energy demand? Yes No If Yes: i. Estimate annual electricity demand during operation of the proposed action: ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other):________________________________________________________________________________________________ iii. Will the proposed action require a new, or an upgrade, to an existing substation? Yes No l. Hours of operation. Answer all items which apply. i. During Construction: ii. During Operations:  Monday - Friday:  Monday - Friday:  Saturday:  Saturday:  Sunday:  Sunday:  Holidays:  Holidays: m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes No operation, or both? If yes: i. Provide details including sources, time of day and duration: ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? Yes No Describe: n. Will the proposed action have outdoor lighting? Yes No If yes: i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes No Describe: o. Does the proposed action have the potential to produce odors for more than one hour per day? Yes No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) Yes No or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes: i. Product(s) to be stored ii. Volume(s) per unit time (e.g., month, year) iii. Generally, describe the proposed storage facilities: q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides Yes No (i.e., herbicides, insecticide) during construction or operation? If Yes: i. Describe proposed treatment(s): ii. Will the proposed action use Integrated Pest Management Practices? Yes No Page 8 of 15 FEAF 2026 17

Page 18

r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes No of solid waste (excluding hazardous materials)? If Yes: i. Describe any solid waste(s) to be generated during construction or operation of the facility:  Construction: tons per (unit of time)  Operation : tons per (unit of time) ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:  Construction:  Operation: iii. Proposed disposal methods/facilities for solid waste generated on-site:  Construction:  Operation: s. Does the proposed action include construction or modification of a solid waste management facility? Yes No If Yes: i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or9 9 other disposal activities): ii. Anticipated rate of disposal/processing:  Tons/month, if transfer or other non-combustion/thermal treatment, or  Tons/hour, if combustion or thermal treatment iii. If landfill, anticipated site life: years t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes No waste? If Yes: 9 9 i. Name(s) of all hazardous wastes or constituents to be generated, handled, or managed at facility: ii. Generally describe processes or activities involving hazardous wastes or constituents: iii. Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization, recycling, or reuse of hazardous constituents: 9 v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? Yes No If Yes: provide name and location of facility:________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: 9 9 9 Page 9 of 15 FEAF 2026 18

Page 19

9 99 E. Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a. Existing land uses. i. Check all uses that occur on, adjoining and near the project site. 9Urban 9Industrial 9Commercial 9Residential (suburban) 9Rural (non-farm) 9Forest 9Agriculture 9Aquatic 9Other (specify): 9 9 ii. If mix of uses, generally describe: 9 b. Land uses and cover types on the project site. Land use or Current Acreage After 9 Change 9 Cover type Acreage Project Completion (Acres +/-)  Roads, buildings, and other paved or impervious surfaces (total)  • Industrial or manufacturing • Commercial • Residential  Forested  Meadows, grasslands or brushlands (non- agricultural, including abandoned agricultural)  Agricultural (includes active orchards, field, greenhouse, etc.)  Surface water features (lakes, ponds, streams, rivers, etc.) 9 9  Wetlands (freshwater or tidal)  Non-vegetated (bare rock, earth, or fill)  Other, Describe: 9 9 Page 10 of 15 FEAF 2026 19

Page 20

c. Is the project site presently used by members of the community for public recreation? 9 Yes 9 No i. If Yes: explain: d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed 9 Yes 9 No day care centers, or group homes) within 1500 feet of the project site? If Yes, i. Identify facilities: e. Does the project site contain an existing dam? 9 Yes 9 No If Yes: i. Dimensions of the dam and impoundment:  Dam height: feet  Dam length: feet  Surface area: acres  Volume impounded: gallons OR acre-feet ii. Dam’s existing hazard classification: iii. Provide date and summarize results of last inspection: f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, 9 Yes 9 No or does the project site adjoin property that is now, or was at one time, used as a solid waste management facility? If Yes: i. Has the facility been formally closed? 9 Yes 9 No  If Yes, cite sources/documentation: ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: iii. Describe any development constraints due to the prior solid waste activities: g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin 9 Yes 9 No property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred: h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any 9 Yes 9 No remedial actions been conducted at or adjacent to the proposed site? If Yes: i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site 9 Yes 9 No Remediation database? Check all that apply: 9 Yes – Spills Incidents database Provide DEC ID number(s): 9 Yes – Environmental Site Remediation database Provide DEC ID number(s): 9 Neither database ii. If site has been subject of RCRA corrective activities, describe control measures: iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? 9 Yes 9 No If Yes, provide DEC ID number(s): iv. If Yes to (i), (ii) or (iii) above, describe current status of site(s): Page 11 of 15 FEAF 2026 20

Page 21

v. Is the project site subject to an institutional control limiting property uses? 9 Yes9 No  If Yes, DEC site ID number:  Describe the type of institutional control (e.g., deed restriction or easement):  Describe any use limitations:  Describe any engineering controls:  Will the project affect the institutional or engineering controls in place? 9 Yes9 No  Explain: E.2. Natural Resources On or Near Project Site a. What is the average depth to bedrock on the project site? feet b. Are there bedrock outcroppings on the project site? 9 Yes9 No If Yes, what proportion of the site is comprised of bedrock outcroppings? % c. Predominant soil type(s) present on project site: % ________________________ _________% ________________________ _________% d. What is the average depth to the water table on the project site? Average: feet e. Drainage status of project site soils: 9 Well Drained: % of site 9 Moderately Well Drained: % of site 9 Poorly Drained % of site f. Approximate proportion of proposed action site with slopes: 9 0-10%: % of site 9 10-15%: % of site 9 15% or greater: % of site g. Are there any unique geologic features on the project site? 9 9 Yes No If Yes, describe: h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, 9 Yes 9 No ponds, or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? 9 Yes No If Yes to either i or ii, continue. If No, skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, 9 Yes No state or local agency? iv. For each identified regulated wetland and waterbody on the project site, provide the following information:  Streams: Name Classification • Lakes or Ponds: Name Classification • Wetlands: Name Approximate Size • Wetland No. (if regulated by DEC) v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired 9 Yes9 No waterbodies? If Yes, name of impaired water body/bodies and basis for listing as impaired: i. Is the project site in a designated Floodway? 9 9 Yes No j. Is the project site in the 100-year Floodplain? 9 9 Yes No 9 9 k. Is the project site in the 500-year Floodplain? Yes No 9 9 l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? Yes No If Yes: i. Name of aquifer: Page 12 of 15 FEAF 2026 21

Page 22

m. Identify the predominant wildlife species that occupy or use the project site: n. Does the project site contain a designated significant natural community? 9 Yes 9 No If Yes: i. Describe the habitat/community (composition, function, and basis for designation): ii. Source(s) of description or evaluation: iii. Extent of community/habitat:  Currently: acres  Following completion of project as proposed: acres  Gain or loss (indicate + or -): acres o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as 9 Yes 9 No endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? If Yes: i. Species and listing (endangered or threatened): p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of 9 Yes 9 No special concern? If Yes: i. Species and listing: q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? 9 Yes 9 No If Yes, give a brief description of how the proposed action may affect that use: E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to 9 Yes 9 No Agriculture and Markets Law, Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: b. Are agricultural lands consisting of highly productive soils present? 9 Yes 9 No i. If Yes: acreage(s) on project site? ii. Source(s) of soil rating(s): c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National 9 Yes 9 No Natural Landmark? If Yes: i. Nature of the natural landmark: 9 Biological Community 9 Geological Feature ii. Provide brief description of landmark, including values behind designation and approximate size/extent: d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? 9 Yes 9 No If Yes: i. CEA name: ii. Basis for designation: iii. Designating agency and date: Page 13 of 15 FEAF 2026 22

Page 23

e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district Yes No listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYSOffice of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes: i. Nature of historic/archaeological resource: Archaeological Site Historic Building or District ii. Name: iii. Brief description of attributes on which listing is based: f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for Yes No archaeological sites on the New York State Historic Preservation Office (SHPO) archaeological site inventory? g. Have additional archaeological or historic site(s) or resources been identified on the project site? Yes No If Yes: i. Describe possible resource(s): ii. Basis for identification: h. Is the project site within five miles of any officially designated and publicly accessible federal, state, or local Yes No scenic, or aesthetic resource? If Yes: i. Identify resource: ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail, or scenic byway, etc.): iii. Distance between project and resource: miles. i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers Yes No Program 6 NYCRR 666? If Yes: i. Identify the name of the river and its designation: ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? Yes No E.4. Disadvantaged Communities Designated Pursuant to ECL Article 75 a. Is the project located within, or within ½ mile of, a disadvantaged community? Yes No If No, could impacts(see examples below in E.4.b) from the project affect a disadvantaged community? Yes No If Yes to either question in E.4.a, answer the remaining questions in this section. b. Will there be direct or indirect impacts that may affect a disadvantaged community, such as those listed below? Yes No i. new noise sources or expansions/modification of existing noise sources; - noise from operational sources - noise from construction activities ii. emissions of air pollutants including, mobile emissions; iii. wastewater discharges; iv. generation of odors; v. light pollution; vi. new or modified radiation sources; vii. new or modified sources of solid waste generation, management, or disposal. If Yes, describe the impacts: c. Do any of the State agency approvals identified in question B.g include any of the following DEC permits? State Pollutant Discharge Elimination System (SPDES) Yes No Solid Waste Management Facility Yes No Hazardous Waste Management Facility Yes No Air Pollution Control (Title V or Air State Facility) Yes No Water Withdrawal over 20 MGD for Cooling Water Yes No Waste Transporter Yes No Page 14 of 15 FEAF 2026 23

Page 24

E.5 Future Physical Climate Risks Will the proposed action be vulnerable to the following future physical climate risks under current or projected future conditions: a. Is the proposed action vulnerable to damage from a projected 100-year flood? Yes No b. Is the proposed action vulnerable to damage from a projected 500-year flood? Yes No c. Is the proposed action in an area potentially affected by sea level rise? Yes No d. Will the proposed action increase the vulnerability of human or ecological communities to the following: i. drought? Yes No ii. temperature extremes (hot or cold)? Yes No iii. extreme storms, including high winds? Yes No iv. landslides? Yes No v. coastal erosion? Yes No vi. stormwater flooding? Yes No vii. other climate or weather hazards? Yes No If Yes, describe: _____________________________________ F. Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verification I certify that the information provided is true to the best of my knowledge. Joshua Rogers 9-18-26 Applicant/Sponsor Name Date Town Planner Signature Title Page 15 of 15 FEAF 2026 24

Page 25

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.4. Hamburg Woodlawn Gateway Brownfield Opportunity Area (BOA) Plan Lead Agency and Public Hearing Resolution WHEREAS, the Town of Hamburg has participated in the preparation of the Hamburg Woodlawn Gateway Brownfield Opportunity Area (BOA) Plan pursuant to the New York State Brownfield Opportunity Area Program; and WHEREAS, the Hamburg Woodlawn Gateway BOA Plan provides a comprehensive framework for the revitalization, redevelopment, and sustainable growth of properties within the designated Brownfield Opportunity Area; and WHEREAS, the adoption of the Hamburg Woodlawn Gateway BOA Plan constitutes an action subject to review under the New York State Environmental Quality Review Act (SEQRA); and WHEREAS, pursuant to section 617.4 (b)(1) of the SEQRA regulations, the Town Board has determined that the Proposed Action constitutes a “Type I Action,” and a coordinated review will be conducted; and WHEREAS, pursuant to SEQRA and its implementing regulations, the Town of Hamburg Town Board has determined that it is the appropriate agency to coordinate the environmental review of the proposed action. NOW, THEREFORE, BE IT RESOLVED, that the Town of Hamburg Town Board hereby declares its intent to serve as Lead Agency for the environmental review associated with the adoption of the Hamburg Woodlawn Gateway BOA Plan pursuant to the State Environmental Quality Review Act and its implementing regulations; and BE IT FURTHER RESOLVED, that the Town Planning Department is hereby authorized and directed to circulate the appropriate Lead Agency Coordination Notice to all involved and interested agencies, as required by SEQRA; and BE IT FURTHER RESOLVED, the Town of Hamburg Town Board hereby authorizes the 239-M referral of the Hamburg Woodlawn Gateway BOA Plan to Erie County; and BE IT FURTHER RESOLVED, the Town of Hamburg Town Board sets a Public Hearing on the 25

Page 26

Hamburg Woodlawn Gateway BOA Plan at the Hamburg Town Hall, 6100 South Park Avenue, Hamburg, NY at 6:00 pm on December 14th, 2026. BE IT FURTHER RESOLVED, a copy of the Hamburg Woodlawn Gateway BOA Plan can be found on the Town Planning Department page on the Town website: https://www.townofhamburgny.gov/577/Hamburg-Woodlawn-Gateway-Brownfield-Oppo BE IT FINALLY RESOLVED, that upon completion of the coordination process and environmental review, the Town Board shall consider the adoption of the Hamburg Woodlawn Gateway BOA Plan and any related findings and determinations. ATTACHMENTS: Hamburg Woodlawn Gateway BOA FEAF Part 1 updated.pdf 26

Page 27

Full Environmental Assessment Form Part 1 - Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor; and, when possible, generally describe work or studies that would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that must be answered either “Yes” or “No.” If the answer to the initial question is “Yes,” complete the following sub-questions. If the answer to the initial question is “No,” proceed to the next question. Section F allows the project sponsor to identify and attach additional information. Section G requires the name and signature of the applicant or project sponsor to verify the information in Part 1 is accurate and complete. A. Project and Applicant/Sponsor Information. Name of Action or Project: Hamburg Woodlawn Gateway BOA Plan Project Location (describe and attach a general location map): Hamlets of Woodlawn and Athol Springs, Town of Hamburg, NY Brief Description of Proposed Action (include purpose or need): The proposed action involves adoption by the Town Board of the Hamburg Woodlawn Brownfield Opportunity Area (BOA) Plan. The Plan establishes a community-supported vision and framework for revitalization and redevelopment within the Woodlawn BOA study area. It identifies opportunities to address brownfield and underutilized properties, encourage compatible redevelopment, enhance the public realm, improve connectivity, and support economic development. The Plan includes recommendations and implementation strategies intended to guide future public and private investment and decision-making within the study area. Name of Applicant/Sponsor: Telephone: (716) 649-6111 Town of Hamburg E-Mail: [email protected] Address: 6100 South Park Avenue City/PO: State: Zip Code: Hamburg New York 14075 Project Contact (if not same as sponsor; give name and title/role): Telephone: E-Mail: Address: City/PO: State: Zip Code: Property Owner (if not same as sponsor): Telephone: E-Mail: Address: City/PO: State: Zip Code: Page 1 of 15 FEAF 2026 27

Page 28

B. Government Approvals B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Council, Town Board, 9✔ Yes 9 No Town Board - Plan adoption October-December 2026 or Village Board of Trustees b. City, Town or Village 9✔ Yes 9 No Planning Board - recommendation October-December 2026 Planning Board or Commission for Plan adoption c. City, Town or 9 Yes 9✔ No Village Zoning Board of Appeals d. Other local agencies 9 Yes 9✔ No e. County agencies 9 Yes 9✔ No f. Regional agencies 9 Yes 9✔ No g. State agencies 9✔ Yes 9 No New York State Department of State October 2026-Winter 2027 (NYSDOS) BOA Designation h. Federal agencies 9 Yes 9✔ No i. Coastal Resources. i. Is the project site within a Coastal Area or the waterfront area of a Designated Inland Waterway? 9 ✔ Yes 9 No ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? 9 Yes No ✔ iii. Is the project site within a Coastal Erosion Hazard Area? 9 ✔ Yes 9 No C. Planning and Zoning C.1. Planning and zoning actions. Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule, or regulation be the 9 ✔ Yes 9 No only approval(s) that must be granted to enable the proposed action to proceed?  If Yes, complete sections C, F and G.  If No, proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2. Adopted land use plans. a. Do any municipally adopted (city, town, village, or county) comprehensive land use plan(s) include the site 9 ✔ Yes 9 No where the proposed action would be located? If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action ✔ Yes No would be located? 9 b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; ✔ Yes No Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; 9 9 or other)? If Yes, identify the plan(s): Western Erie Canal Natural Heritage Corridor, Erie County Agricultural and Farmland Protection Plan, Regional Niagara River/Lake Erie Watershed Management Plan c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan ✔ Yes No or an adopted municipal farmland protection plan? 9 9 If Yes, identify the plan(s): Erie County Parks Master Plan Page 2 of 15 FEAF 2026 28

Page 29

d. Is the proposed action in a municipality with an adopted comprehensive or individual plan that addresses climate Yes ✔ No change? 9 9 If Yes , identify the elements of the plan that are relevant to the action: 9 9 C.3. Zoning 9 9 a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance? Yes No If Yes, what is the zoning classification(s) including any applicable overlay district? Numerous zoning districts. Proposed action is the adoption of a BOA Plan for the Hamburg Woodlawn Gateway study area b. Is the use permitted or allowed by a special or conditional use permit? N/A Yes No c. Is a zoning change requested as part of the proposed action? Yes ✔ No If Yes, what is the proposed new zoning for the site? C.4. Existing community services. a. In what school district is the project site located? Frontier Central School District b. What police or other public protection forces serve the project site? Hamburg Police Department, Blasdell Police Department, Erie County Sheriff New York State Police c. Which fire protection and emergency medical services serve the project site? Woodlawn Volunteer Fire Department, Village of Blasdell Volunteer Fire Department d. What parks serve the project site? There are 12 parks within or in the immediate vicinity of the BOA. D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? 9 9 b. a. Total acreage of the site of the proposed action? acres b. Total acreage to be physically disturbed? acres 9 9 c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? acres c. Is the proposed action an expansion of an existing project or use? 9 Yes9 No If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % Units: d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes9 No If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ii. Is a cluster/conservation layout proposed? Yes No iii. Number of lots proposed? iv. Minimum and maximum proposed lot sizes? Minimum Maximum Page 3 of 15 FEAF 2026 29

Page 30

e. Will the proposed action be constructed in multiple phases? 9 Yes 9 No i. If No, anticipated period of construction: months ii. If Yes:  Total number of phases anticipated  Anticipated commencement date of phase 1 (including demolition) month year  Anticipated completion date of final phase month year  Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: 9 9 f. Does the project include new residential uses? Yes No If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family (four or more) 9 9 Initial Phase At completion of all phases 9 9 9 g. Does the proposed action include new non-residential construction (including expansions)? Yes No If Yes, i. Total number of structures ii. Dimensions (in feet) of largest proposed structure: height; width; and length iii. Approximate extent of building space to be heated or cooled: square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any Yes No liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: ii. If a water impoundment, the principal source of the water: Ground water Surface water streams 9 Other 9 specify: iii. If other than water, identify the type of impounded/contained liquids and their source. iv. Approximate size of the proposed impoundment. Volume: million gallons; surface area: acres v. Dimensions of the proposed dam or impounding structure: height; length vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? Yes No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i .What is the purpose of the excavation or dredging? ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?  Volume (specify tons or cubic yards): 9 9  Over what duration of time? iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? Yes No If yes, describe. 9 9 v. What is the total area to be dredged or excavated? acres vi. What is the maximum area to be worked at any one time? acres vii. What would be the maximum depth of excavation or dredging? feet viii. Will the excavation require blasting? Yes No ix. Summarize site reclamation goals and plan: Page 4 of 15 FEAF 2026 30

Page 31

b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ii. Describe how the proposed action would affect that waterbody or wetland, e.g., excavation, fill, placement of structures, or alteration of channels, banks, and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes No If Yes, describe: iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? Yes No If Yes:  acres of aquatic vegetation proposed to be removed:___________________________  expected acreage of aquatic vegetation remaining after project completion:  purpose of proposed removal (e.g. beach clearing, invasive species control, boat access):  proposed method of plant removal:  if chemical/herbicide treatment will be used, specify product(s): v. Describe any proposed reclamation/mitigation following disturbance: c. Will the proposed action use, or create a new demand for water? Yes No If Yes: i. Total anticipated water usage/demand per day: gallons/day ii. Will the proposed action obtain water from an existing public water supply? Yes No If Yes:  Name of district or service area:  Does the existing public water supply have capacity to serve the proposal? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing lines serve the project site? Yes No iii. Will line extension within an existing district be necessary to supply the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project:  Source(s) of supply for the district: iv. Is a new water supply district or service area proposed to be formed to serve the project site? Yes No If, Yes:  Applicant/sponsor for new district:  Date application submitted or anticipated:  Proposed source(s) of supply for new district: v. If a public water supply will not be used, describe plans to provide water supply for the project: vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: gallons/minute. Page 5 of 15 FEAF 2026 31

Page 32

d. Will the proposed action generate liquid wastes? Yes No If Yes: i. Total anticipated liquid waste generation per day: gallons/day ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and approximate volumes or proportions of each): iii. Will the proposed action use any existing public wastewater treatment facilities? Yes No If Yes:  Name of wastewater treatment plant to be used:  Name of district: 9 9  Does the existing wastewater treatment plant have capacity to serve the project? Yes No  Is the project site in the existing district? Yes No  Is expansion of the district needed? Yes No  Do existing sewer lines serve the project site? Yes No  Will a line extension within an existing district be necessary to serve the project? Yes No If Yes:  Describe extensions or capacity expansions proposed to serve this project: 9 9 iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? Yes No If Yes:  Applicant/sponsor for new district: 9 9  Date application submitted or anticipated:  What is the receiving water for the wastewater discharge? v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed receiving water (name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture, recycle or reuse liquid waste: 9 9 e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes No sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point source (i.e., sheet flow) during construction or post construction? If Yes: 9 i. How much impervious surface will the project create in relation to total size of project parcel? Square feet or acres (impervious surface) Square feet or acres (parcel size) ii. Describe types of new point sources. iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties, groundwater, on-site surface water, or off-site surface waters)? 9 9  If to surface waters, identify receiving water bodies or wetlands:  Will stormwater runoff flow to adjacent properties? Yes No iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? Yes No 9 9 9 9 9 9 Page 6 of 15 FEAF 2026 32

Page 33

f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes No combustion, waste incineration, or other processes or operations? If Yes, identify: i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles) ______________________________________________________________________________________________________ ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers) ______________________________________________________________________________________________________ iii. Stationary sources during operations (e.g., process emissions, boilers, electric generation, surface coating) ______________________________________________________________________________________________________ g. Will any air emission sources named in D.2.f (above), require an Air Facility Registration, Air State Facility Yes No Permit, Title IV Permit or Title V Permit? If Yes: i. Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration Yes No requirements discussed in 6 NYCRR Part 231? ii. As calculated in the air permit application, the proposed action has the potential to emit:  Tons/year (short tons) of carbon monoxide (CO)  Tons/year (short tons) of oxides of nitrogen (NOx)  Tons/year (short tons) of particulate matter (PM-10, PM-2.5)  Tons/year (short tons) of volatile organic compounds (VOC)  Tons/year (short tons) of sulfur dioxide (SO2) iii. Will emissions of air contaminants from the proposed action described above exceed the corresponding major Yes No source thresholds? iv.Does the proposed action have the potential to emit 10 tons/year or more of any one designated hazardous air Yes No pollutant or 25 tons/year or more of any combination of such hazardous air pollutants (6NYCRR 200.1(ag))? If Yes, provide the total potential to emit hazardous air pollutants in short tons/year: _____________________________ h. Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions, such as carbon dioxide, methane, nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxide equivalents per year at any point in the lifetime of the proposed action (estimated using the carbon dioxide equivalent definition and global warming potentials provided in 6 NYCRR Part 496)? Yes No If Yes: i. Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric): ii. Describe any greenhouse gas capture, control, or elimination measures included in project design: i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes No quarry or landfill operations? If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust): j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial Yes No new demand for transportation facilities or services? If Yes: i. When is the peak traffic expected (Check all that apply): Morning Evening Weekend Randomly between hours of to . ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): iii. Parking spaces: Existing Proposed Net increase/decrease iv. Does the proposed action include any shared use parking? Yes No v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe: ______________________________________________________________________________________________________________ vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? Yes No vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric Yes No or other alternative fueled vehicles? viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing Yes No pedestrian or bicycle routes? Page 7 of 15 FEAF 2026 33

Page 34

k. Will the proposed action (for commercial or industrial projects only) generate new or additional energy demand? Yes No If Yes: i. Estimate annual electricity demand during operation of the proposed action: ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other):________________________________________________________________________________________________ iii. Will the proposed action require a new, or an upgrade, to an existing substation? Yes No l. Hours of operation. Answer all items which apply. i. During Construction: ii. During Operations:  Monday - Friday:  Monday - Friday:  Saturday:  Saturday:  Sunday:  Sunday:  Holidays:  Holidays: m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes No operation, or both? If yes: i. Provide details including sources, time of day and duration: ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? Yes No Describe: n. Will the proposed action have outdoor lighting? Yes No If yes: i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes No Describe: o. Does the proposed action have the potential to produce odors for more than one hour per day? Yes No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) Yes No or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes: i. Product(s) to be stored ii. Volume(s) per unit time (e.g., month, year) iii. Generally, describe the proposed storage facilities: q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides Yes No (i.e., herbicides, insecticide) during construction or operation? If Yes: i. Describe proposed treatment(s): ii. Will the proposed action use Integrated Pest Management Practices? Yes No Page 8 of 15 FEAF 2026 34

Page 35

r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes No of solid waste (excluding hazardous materials)? If Yes: i. Describe any solid waste(s) to be generated during construction or operation of the facility:  Construction: tons per (unit of time)  Operation : tons per (unit of time) ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:  Construction:  Operation: iii. Proposed disposal methods/facilities for solid waste generated on-site:  Construction:  Operation: s. Does the proposed action include construction or modification of a solid waste management facility? Yes No If Yes: i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or9 9 other disposal activities): ii. Anticipated rate of disposal/processing:  Tons/month, if transfer or other non-combustion/thermal treatment, or  Tons/hour, if combustion or thermal treatment iii. If landfill, anticipated site life: years t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes No waste? If Yes: 9 9 i. Name(s) of all hazardous wastes or constituents to be generated, handled, or managed at facility: ii. Generally describe processes or activities involving hazardous wastes or constituents: iii. Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization, recycling, or reuse of hazardous constituents: 9 v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? Yes No If Yes: provide name and location of facility:________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: 9 9 9 Page 9 of 15 FEAF 2026 35

Page 36

9 99 E. Site and Setting of Proposed Action E.1. Land uses on and surrounding the project site a. Existing land uses. i. Check all uses that occur on, adjoining and near the project site. 9Urban 9Industrial 9Commercial 9Residential (suburban) 9Rural (non-farm) 9Forest 9Agriculture 9Aquatic 9Other (specify): 9 9 ii. If mix of uses, generally describe: 9 b. Land uses and cover types on the project site. Land use or Current Acreage After 9 Change 9 Cover type Acreage Project Completion (Acres +/-)  Roads, buildings, and other paved or impervious surfaces (total)  • Industrial or manufacturing • Commercial • Residential  Forested  Meadows, grasslands or brushlands (non- agricultural, including abandoned agricultural)  Agricultural (includes active orchards, field, greenhouse, etc.)  Surface water features (lakes, ponds, streams, rivers, etc.) 9 9  Wetlands (freshwater or tidal)  Non-vegetated (bare rock, earth, or fill)  Other, Describe: 9 9 Page 10 of 15 FEAF 2026 36

Page 37

c. Is the project site presently used by members of the community for public recreation? 9 Yes 9 No i. If Yes: explain: d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed 9 Yes 9 No day care centers, or group homes) within 1500 feet of the project site? If Yes, i. Identify facilities: e. Does the project site contain an existing dam? 9 Yes 9 No If Yes: i. Dimensions of the dam and impoundment:  Dam height: feet  Dam length: feet  Surface area: acres  Volume impounded: gallons OR acre-feet ii. Dam’s existing hazard classification: iii. Provide date and summarize results of last inspection: f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, 9 Yes 9 No or does the project site adjoin property that is now, or was at one time, used as a solid waste management facility? If Yes: i. Has the facility been formally closed? 9 Yes 9 No  If Yes, cite sources/documentation: ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: iii. Describe any development constraints due to the prior solid waste activities: g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin 9 Yes 9 No property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred: h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any 9 Yes 9 No remedial actions been conducted at or adjacent to the proposed site? If Yes: i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site 9 Yes 9 No Remediation database? Check all that apply: 9 Yes – Spills Incidents database Provide DEC ID number(s): 9 Yes – Environmental Site Remediation database Provide DEC ID number(s): 9 Neither database ii. If site has been subject of RCRA corrective activities, describe control measures: iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? 9 Yes 9 No If Yes, provide DEC ID number(s): iv. If Yes to (i), (ii) or (iii) above, describe current status of site(s): Page 11 of 15 FEAF 2026 37

Page 38

v. Is the project site subject to an institutional control limiting property uses? 9 Yes9 No  If Yes, DEC site ID number:  Describe the type of institutional control (e.g., deed restriction or easement):  Describe any use limitations:  Describe any engineering controls:  Will the project affect the institutional or engineering controls in place? 9 Yes9 No  Explain: E.2. Natural Resources On or Near Project Site a. What is the average depth to bedrock on the project site? feet b. Are there bedrock outcroppings on the project site? 9 Yes9 No If Yes, what proportion of the site is comprised of bedrock outcroppings? % c. Predominant soil type(s) present on project site: % ________________________ _________% ________________________ _________% d. What is the average depth to the water table on the project site? Average: feet e. Drainage status of project site soils: 9 Well Drained: % of site 9 Moderately Well Drained: % of site 9 Poorly Drained % of site f. Approximate proportion of proposed action site with slopes: 9 0-10%: % of site 9 10-15%: % of site 9 15% or greater: % of site g. Are there any unique geologic features on the project site? 9 9 Yes No If Yes, describe: h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, 9 Yes 9 No ponds, or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? 9 Yes No If Yes to either i or ii, continue. If No, skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, 9 Yes No state or local agency? iv. For each identified regulated wetland and waterbody on the project site, provide the following information:  Streams: Name Classification • Lakes or Ponds: Name Classification • Wetlands: Name Approximate Size • Wetland No. (if regulated by DEC) v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired 9 Yes9 No waterbodies? If Yes, name of impaired water body/bodies and basis for listing as impaired: i. Is the project site in a designated Floodway? 9 9 Yes No j. Is the project site in the 100-year Floodplain? 9 9 Yes No 9 9 k. Is the project site in the 500-year Floodplain? Yes No 9 9 l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? Yes No If Yes: i. Name of aquifer: Page 12 of 15 FEAF 2026 38

Page 39

m. Identify the predominant wildlife species that occupy or use the project site: n. Does the project site contain a designated significant natural community? 9 Yes 9 No If Yes: i. Describe the habitat/community (composition, function, and basis for designation): ii. Source(s) of description or evaluation: iii. Extent of community/habitat:  Currently: acres  Following completion of project as proposed: acres  Gain or loss (indicate + or -): acres o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as 9 Yes 9 No endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species? If Yes: i. Species and listing (endangered or threatened): p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of 9 Yes 9 No special concern? If Yes: i. Species and listing: q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? 9 Yes 9 No If Yes, give a brief description of how the proposed action may affect that use: E.3. Designated Public Resources On or Near Project Site a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to 9 Yes 9 No Agriculture and Markets Law, Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: b. Are agricultural lands consisting of highly productive soils present? 9 Yes 9 No i. If Yes: acreage(s) on project site? ii. Source(s) of soil rating(s): c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National 9 Yes 9 No Natural Landmark? If Yes: i. Nature of the natural landmark: 9 Biological Community 9 Geological Feature ii. Provide brief description of landmark, including values behind designation and approximate size/extent: d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? 9 Yes 9 No If Yes: i. CEA name: ii. Basis for designation: iii. Designating agency and date: Page 13 of 15 FEAF 2026 39

Page 40

e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district Yes No listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYSOffice of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes: i. Nature of historic/archaeological resource: Archaeological Site Historic Building or District ii. Name: iii. Brief description of attributes on which listing is based: f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for Yes No archaeological sites on the New York State Historic Preservation Office (SHPO) archaeological site inventory? g. Have additional archaeological or historic site(s) or resources been identified on the project site? Yes No If Yes: i. Describe possible resource(s): ii. Basis for identification: h. Is the project site within five miles of any officially designated and publicly accessible federal, state, or local Yes No scenic, or aesthetic resource? If Yes: i. Identify resource: ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail, or scenic byway, etc.): iii. Distance between project and resource: miles. i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers Yes No Program 6 NYCRR 666? If Yes: i. Identify the name of the river and its designation: ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? Yes No E.4. Disadvantaged Communities Designated Pursuant to ECL Article 75 a. Is the project located within, or within ½ mile of, a disadvantaged community? Yes No If No, could impacts(see examples below in E.4.b) from the project affect a disadvantaged community? Yes No If Yes to either question in E.4.a, answer the remaining questions in this section. b. Will there be direct or indirect impacts that may affect a disadvantaged community, such as those listed below? Yes No i. new noise sources or expansions/modification of existing noise sources; - noise from operational sources - noise from construction activities ii. emissions of air pollutants including, mobile emissions; iii. wastewater discharges; iv. generation of odors; v. light pollution; vi. new or modified radiation sources; vii. new or modified sources of solid waste generation, management, or disposal. If Yes, describe the impacts: c. Do any of the State agency approvals identified in question B.g include any of the following DEC permits? State Pollutant Discharge Elimination System (SPDES) Yes No Solid Waste Management Facility Yes No Hazardous Waste Management Facility Yes No Air Pollution Control (Title V or Air State Facility) Yes No Water Withdrawal over 20 MGD for Cooling Water Yes No Waste Transporter Yes No Page 14 of 15 FEAF 2026 40

Page 41

E.5 Future Physical Climate Risks Will the proposed action be vulnerable to the following future physical climate risks under current or projected future conditions: a. Is the proposed action vulnerable to damage from a projected 100-year flood? Yes No b. Is the proposed action vulnerable to damage from a projected 500-year flood? Yes No c. Is the proposed action in an area potentially affected by sea level rise? Yes No d. Will the proposed action increase the vulnerability of human or ecological communities to the following: i. drought? Yes No ii. temperature extremes (hot or cold)? Yes No iii. extreme storms, including high winds? Yes No iv. landslides? Yes No v. coastal erosion? Yes No vi. stormwater flooding? Yes No vii. other climate or weather hazards? Yes No If Yes, describe: _____________________________________ F. Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verification I certify that the information provided is true to the best of my knowledge. Town of Hamburg Applicant/Sponsor Name Date Signature Title Page 15 of 15 FEAF 2026 41

Page 42

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.5. Amendments to the 2027 Supervisor's Budget WHEREAS, the following amendments to the 2027 Supervisor's Budget do not result in any change to the proposed ad valorem tax rates. NOW, THEREFORE, BE IT RESOLVED, that the Hamburg Town Board hereby amends the 2027 Supervisor's Budget as follows: ATTACHMENTS: DOC103026-004.pdf 42

Page 43

43

Page 44

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.6. Order Establishing the Town of Hamburg Ambulance District WHEREAS, on September 28, 2026, the Town Board of the Town of Hamburg, New York (the “Town Board”), in accordance with the requirements of Article 12-a of the New York Town Law, adopted a resolution approving the creation of the Town of Hamburg Ambulance District (“District”) subject to a permissive referendum (the “Resolution”); and WHEREAS, prior to the adoption of said resolution, the Town Board authorized the preparation of a map, plan and report pursuant to the requirements of Town Law § 209-c (“Report”) to support the establishment of the District, and the Town Board, on August 10, 2026, duly adopted an order pursuant to Town Law § 209-d calling for a public a public hearing on the establishment of the District (“Notice of Hearing”); and WHEREAS, on August 24, 2026, the Town Board held a public hearing on the establishment of the District and to hear all persons interested in the subject thereof concerning the same; and WHEREAS, as stated in the Notice of Hearing, it is in the best interest of the Town that the District include all properties within the boundaries of the Town, including all properties located within the Villages of Blasdell and Hamburg (the “Villages”); and WHEREAS, the Villages have not duly adopted resolutions consenting to their inclusion in the District; and WHEREAS, the Town Clerk reported to the Town Board that notices of the adoption of the Resolution were duly posted and published as required by law and that the Town Clerk had petitions requesting a permissive referendum available in the Town Clerk’s Office and that more than thirty (30) days have elapsed since September 28, 2026 and no petitions requesting a permissive referendum have been filed with the Town Clerk; and WHEREAS, this Town Board is now empowered to order the establishment of the District; NOW, THEREFORE, BE IT ORDERED, by the Town Board, as follows: 44

Page 45

1. Consistent with the Report, the Notice of Hearing, and the Resolution establishing the District, the Town of Hamburg Ambulance District is hereby established to include all properties within the boundaries of the Town, excluding the Village of Hamburg and Village of Blasdell. 2. The Town Clerk is hereby directed to certify a copy of this Order and forthwith record the same in the office of the Clerk of the County of Erie in which the Town of Hamburg is situated and to forward a certified copy of the same to the Department of Audit and Control. 45

Page 46

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.7. Urging New York State to Amend Criminal Procedure Law for Repeat Juvenile Offenders and Restore Judicial Discretion WHEREAS, the Town Board of the Town of Hamburg is committed to protecting the safety, welfare, and quality of life of its residents; and WHEREAS, municipalities throughout Erie County and New York State have experienced incidents involving repeat juvenile offenders, including vehicle thefts, property crimes, and other offenses that have significant impacts on residents, businesses, and law enforcement resources; and WHEREAS, local governments and law enforcement agencies have expressed concerns regarding the ability to effectively address repeat juvenile offending while ensuring accountability, and public safety; and WHEREAS, the Town Board recognizes the importance of balancing rehabilitation opportunities for youth with the need to protect victims and communities from repeated criminal behavior; and WHEREAS, repeated criminal activity, court-related noncompliance, and property offenses committed by repeat offenders may result in increased expenditures of municipal resources, including law enforcement response, public safety services, court administration, and related governmental functions; and WHEREAS, enhancing public safety tools and improving accountability for repeat offenders may help reduce the long-term financial burden on local governments and taxpayers. NOW, THEREFORE, BE IT RESOLVED, that the Hamburg Town Board respectfully urges the New York State Legislature to review and amend existing laws, where appropriate, to restore judicial discretion in release and detention determinations to address repeat juvenile offending and chronic failures to appear in court; and BE IT FURTHER RESOLVED, that such review should consider measures that enhance judicial discretion, improve accountability for repeat offenders, support victims of crime, and strengthen public safety while preserving appropriate rehabilitation opportunities for youth; and 46

Page 47

BE IT FURTHER RESOLVED, that the Town Board encourages other municipalities and local government organizations throughout New York State to join in advocating for public safety reforms that address repeat juvenile offending and its impact on local communities; and BE IT FINALLY RESOLVED, that the Town Clerk is hereby directed to transmit copies of this Resolution to the State of New York, the Majority and Minority Leaders of the New York State Senate and Assembly, the New York State legislature delegation representing Erie County, The Erie County Legislature, neighboring municipalities, and such other officials as may be appropriate. 47

Page 48

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.8. Out of Town Travel Request – POLICE WHEREAS, the National Computer Forensics Institute (NCFI) is offering Introduction to Phone Repair Course (IPR 27-02) from Monday, December 7, 2026 – Friday, December 11, 2026, in Pelham, Alabama; and WHEREAS, there is NO COST for LODGING, MEALS, or TRANSPORTATION; and NOW, THEREFORE BE IT, RESOLVED, the Town Board authorize Officer William Blette to attend the Introduction to Phone Repair Course (IPR 27-02) at no cost. 48

Page 49

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.9. Budget Adjustment - Youth, Recreation, & Senior Services - Town Park WHEREFORE, the Town Board of the Town of Hamburg hereby authorizes the following budget adjustment for Fiscal Year 2026 within the Department of Youth, Recreation & Senior Services to account for an underfunded Town Park Contractual Account (A7180.0440) WHEREAS, funds are available in Senior Services Contractual Account (A6772.0440) NOW, THEREFORE, BE IT RESOLVED, that the Town Supervisor and Finance Department are authorized to adjust the 2026 Budget as follows: Transfer From A6772.0440 to Account A7180.0440 $5,000.00 49

Page 50

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.10. POLICE / Dog Control Officer – Budget Adjustment/Transfer WHEREAS, the Police Department/DCO has requested a budget adjustment as outlined on the Town of Hamburg Budget Adjustment Form to fund necessary expenditures; and NOW, THEREFORE, BE IT RESOLVED, that the Town Board of the Town of Hamburg hereby authorizes the budget adjustment as detailed on the attached Budget Adjustment Form for Fiscal Year 2026; and BE IT FURTHER RESOLVED, the final adopted resolution, together with the completed Budget Adjustment Form, shall be forwarded to the Town Finance Department for processing. ATTACHMENTS: Police_DCO-Budget Adj_Transfer Form-11-2-2026.pdf 50

Page 51

51

Page 52

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.11. POLICE – Budget Amendment Transfer - Grant WHEREAS, the Town of Hamburg Police Department receives grants/donations from time to time and, WHEREAS, the use of these funds has been determined by the granting agency/donor and, NOW, THEREFORE BE IT RESOLVED, that the Town Board approves the receipt of the following monies and approves a budget amendment to the revenue and expenditure accounts as follows: ATTACHMENTS: Budget Adjustment - Spark Good Grant_Shop with a Cop 2026.pdf 52

Page 53

Board Meeting Date: Monday, November 2, 2026 Resolution Number: Recoveries and Sales Budget Adjustment Receipt Revenue Code Expenditure Code Amount To Increase To Increase Purpose/Source $5,000.00 B2705 B3120.0450 Shop with a Cop / Spark Good Grants Total: $5,000.00 53

Page 54

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.12. B&G Budget Transfer RESOLVED, that the Town Board approves the following budget tansfers; and BE IT FURTHER RESOLVED, that the Town Supervisor and Finance Office are authorized and directed to make the necessary accounting and budgetary entries to carry out these transfers. Transfer From: Transfer To: Amount A.1620.303 A.1620.466 $1,617.35 A.1620.303 A.7140.466 $1,165.57 A.1620.303 A.7181.466 $3,812.08 A.1620.303 A.7183.466 $1,029.31 A.1620.303 A.7185.466 $1,013.03 54

Page 55

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.13. Highway Budget Adjustment NOW, THEREFORE BE IT, RESOLVED, that the Town Board approve the transfer of $185,923.00 from the DB Fund Balance into Account DB5142.467 Chemicals (Road Salt) for purchase of road salt that has exceeded the Budget appropriation due to increased need in the first quarter of the year because of frequent snow and ice events that necessitated using the entire allotment of salt purchased through the Erie County Bid process. 55

Page 56

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.14. B&G Revenue Account Transfer WHEREAS, the Buildings & Grounds Department received a check from Auctions International, Inc. for $2,570.00 for a 2013 Ford E350 Shahl Utility Truck, and THEREFORE BE IT RESOLVED, the Town Board approves funds in the amount of $2,570.00 to be deposited into Revenue Account A.2665 and transferred to Account A.1640.201. 56

Page 57

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.15. ECWA Collection Administrative Fee WHEREAS, the Erie County Water Authority (“ECWA”) has formally implemented a procedure that requires municipalities under a Direct Service Agreement with ECWA to collect delinquent water accounts, and remit past due amounts to ECWA; and WHEREAS, the method to collect delinquent water accounts owed to ECWA will be to include the unpaid water accounts on the Town of Hamburg tax bill; and WHEREAS, pursuant to NYS Town Law §198(3)(d) the Town Board may provide that unpaid ECWA charges in arrears for ninety (90) days or longer to be included on the tax bill shall be subject to a surcharge not to exceed ten (10) per centum of the amount due. NOW, THEREFORE, BE IT RESOLVED, that the Town Board of the Town of Hamburg authorizes the assessment of a administrative fee for the collection of ECWA any unpaid charges to ECWA in arrears for ninety (90) days or longer, equal to ten (10) per centum of the amount due, and to be added to the unpaid town ECWA charges on the tax bill. 57

Page 58

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.16. Amendment of Planning & Engineering Fees WHEREAS, the Town of Hamburg Planning and Engineering Departments have various application fees associated with planning board applications, sketch plan reviews, SWPPP reviews, site plan approvals, subdivision approvals, special use permits, rezoning applications, etc.; and WHEREAS, the fees are reviewed and reassessed on an annual basis to meet the costs of such efforts, reviews and inspections by Town personnel. NOW, THEREFORE, BE IT RESOLVED, that the Hamburg Town Board adopts the attached 2027 Schedule of Fees for the Planning and Engineering Departments, which shall apply to all applications starting January 1, 2027. ATTACHMENTS: 2027 Schedule of Fees.xlsx 58

Page 59

TOWN OF HAMBURG 6100 S. Park Ave Hamburg, NY 14075 716-649-6111 www.townofhamburgny.gov Schedule of Fees January 1, 2027 MAJOR SUBDIVISON - PRIVATE Fees WITH NO PUBLIC IMPROVEMENTS Rezoning Application Fees Planning Department Fees Engineering Department Fees 1 Acre or less $550 None >1 - 5 Acres $1,600 None >5 - 10 Acres $3,200 None >10 - 50 Acres $5,300 None >50 Acres $8,000 None MINOR SUBDIVISION UP TO 4 LOTS Planning Department Fees Engineering Department Fees Sketch Plan $200 None Preliminary Plan $300 + $300/lot over 2 $200 (if required) Public Hearing Fee $350 None Final Plat Map Cover (if required) None $350 MAJOR SUBDIVISION 5 LOTS OR MORE (no PIP) Planning Department Fees Engineering Department Fees Sketch Plan $750 $500 Preliminary Plan + $300/lot over 5 $1,500 + $300/lot over 5 $1,000 + $200/lot over 5 Public Hearing Fee $350 $200 Final Plat Map Cover (if required) None $1,000 Re-review of subdivision materials None $1,500 MAJOR SUBDIVISION 5 LOTS OR MORE (with PIP) Planning Department Fees Engineering Department Fees Sketch Plan $750 $750 Preliminary Plan + $300/lot over 5 $2,000 + $300/lot over 5 $2,500 + $300/lot over 5 Public Hearing Fee $415 $375 Final Plat Map Cover (if required) None $2,000 Re-review of subdivision materials None $2,000 All Subdivisions per # Lots/Units Planning Department Fees Engineering Department Fees Final Engineering Review Fee None $70 per lot/unit up to 20 Final Engineering Review Fee None $50 per lot/unit over 20 Public Improvement Permit Planning Department Fees Engineering Department Fees PIP Permits None Based on project costs Clearing, Striping and Erosion Sediment Control None Based on project costs SWPPP Plan Review (Subdivisions) Planning Department Fees Engineering Department Fees 1-4.99 acres None $1,000 5-10 acres None $1,500 Greater than 10 acres None $2,500 Yearly renewal fee None $300 Page 1 of 2 59

Page 60

TOWN OF HAMBURG 6100 S. Park Ave Hamburg, NY 14075 716-649-6111 www.townofhamburgny.gov Schedule of Fees January 1, 2027 SITE PLAN REVIEW FEES Fees Sketch Plan $250 $250 Public Hearing $350 $350 Preliminary Engineering Fee* $400 None Minor Addition and site improvements $400 $400 Less than 1 acre $1,000 $1,000 1 to <2 acres $1,750 $1,750 2 to <5 acres + $500 per acre over 2 $2,000 $2,000 5 to <10 acres + $500 per acre over 5 $5,000 $5,000 10 acres & above + $500 per acre over 10 $10,000 $10,000 $750, $1,000, $1,500, $2,000 & $2,500 $750, $1,000, $1,500, $2,000 & $2,500 Re-review of site plan materials (not a new application) (for each category) (for each category) Special Use Permit $350 + site plan fees Site plan fees only Site Plan Waiver $150 $150 SWPPP Plan Review (Site Plans) Planning Department Fees Engineering Department Fees 1-4.99 acres None $1,000 5-9.99 acres None $1,400 10 acres or greater None $1,900 Yearly renewal fee None $300 *Preliminary Engineering Fee is required for all site plan applications at the time of submittal to the Planning Department. A separate check made to the Town of Hamburg is required. The amount will be deducted from Engineering Department Fees should the application move forward to engineering review following Planning Board approval. If not, the fee shall be forefeited. Page 2 of 2 60

Page 61

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.17. Twin Willow Water Service WHEREAS, the Town of Hamburg is responsible for the waterlines within the Twin Willow area; and WHEREAS, a leak has been detected related to vacant home at 5036 Lakeshore Road, Hamburg 14075, and no shut off valve was located; and WHEREAS, the Engineering Department recommends hiring Russo Development Inc. to install a curb box to address the issue at a cost of $1,490.00. NOW THEREFORE BE IT RESOLVED, that the Town Board authorizes the Town Engineer to sign the attached quote from Russo Development Inc. and for work to start immediately. Funds are available in B.1490.0440.2 ATTACHMENTS: Town of Hamburg - low risk constuction.docx Russo_TOH CONTRACTOR AGREEMENT.docx 61

Page 62

Insurance Requirements Instructions pertaining to the Town of Hamburg regarding: CONTRACTORS’ INSURANCE COVERAGE AND CERTIFICATES 1. GENERAL PROVISIONS As to all required insurance: .1 The Contractor shall provide current Certificates of Insurance and accompanying documents as described herein for the Town’s approval prior to Town’s signing of contract(s). .2 “Certificate Holder” shall be Town of Hamburg at the address of 6100 South Park Avenue Hamburg, NY 14075 .3 Coverage must comply with all specifications set forth herein. .4 All insurance documents must be executed with authorized signatures. .5 The Contractor’s required liability policies must be endorsed to provide that any Notice of Cancellation or Notice of Non-Renewal given to the First Named Insured shall also be given to the Additional Insureds for this project. A copy of such endorsement(s) must be furnished to the Certificate Holder. .6 Failure of the Town to object to the Contractor’s failure to furnish a Certificate or other evidence of the required insurance coverages, object to any defect in such Certificate or other evidence of coverage, or demand receipt of such Certificate or other evidence of coverage shall not be deemed a waiver of Contractor’s obligation to furnish the required insurance coverages described herein. Nothing contained herein imposes on the Town a duty or obligation to review any evidence of insurance coverages or issue any formal approval or acceptance of such evidence. .7 The Contractor’s liability and indemnification of the Town shall not be relieved or diminished by the Contractor securing insurance coverage in accordance with the Town’s requirements. Any approval by the Town of such insurance coverage shall not be construed as accepting in any way the deficiencies in the Contractor’s insurance coverage. .8 In addition to Certificates of Insurance and other documents, the Contractor shall provide to the Town and other Certificate Holders, on a timely basis, copies of any subsequently issued endorsement(s) that amend applicable coverages or limits. .9 When any required insurance shall expire, due to the attainment of a normal expiration or renewal date, the Contractor shall supply, no later than ten (10) days prior to such expiration, the Town with Certificates of Insurance and accompanying documents evidencing continuation of coverage in the same manner, limits of protection and scope as provided by the previous policy. .10 The Contractor will assure that any and all subcontractors retained by the Contractor carry and maintain insurance with reasonably prudent limits and coverage satisfactory to the Town in light of the work to be performed, written by companies meeting the same criteria as required in Section 2. LIABILITY INSURANCE, and that the Town is named additional insured on the subcontractor’s liability policies according to the same requirements as described in Section 2.1(b). .11 The Contractor shall disclose to the Town any deductible or self-insured retentions applicable to any of the coverages required herein of the Contractor. .12 The Contractor’s liabiltiy coverage must not contain any exlcusions or restriction of coverage for claims involving New York Labor Law, Employer’s Liability, third party over actions, or equivalent. 62

Page 63

2. LIABILITY INSURANCE The Contractor agrees to secure and maintain, at the Contractor’s own expense, all insurance coverage required herein from one or more insurance companies that are licensed to write such insurance in New York State or are eligible non-admitted insurers, per the current Excess Line Association of New York’s (ELANY) official list. Insurers must carry an A.M. Best “Secure” rating of A- or better. The Contractor’s insurance shall include the following, and shall be written with limits no less than hereinafter specified: .1 COMMERCIAL GENERAL LIABILITY (a) Occurrence based Commercial General Liability coverage to include bodily injury, personal injury, and property damage applicable to ongoing operations, products & completed operations, and contractual liability, all with a per-project aggregate endorsement. There shall be no exclusions for NY State Labor Law. There shall be no exclusions for explosion, collapse, and underground operations (“XCU”). The coverage limits applicable shall be the greater of the amounts indicated below or the amounts carried by the Contractor: General Aggregate $2,000,000 Products & Comp/Op. Aggregate $2,000,000 Personal & Advertising Injury $1,000,000 Each Occurrence $1,000,000 Fire Damage (any one fire) $ 50,000 Med. Expense (any one person) $ 5,000 (b) Additional Insured: Coverage in Commercial General Liability, Automobile Liability, and Excess Liability and/or Umbrella Liability policies or coverage sections shall be written or endorsed so as to apply to the following as additional insured on a primary and non-contributory basis: "Town of Hamburg and its employees, authorized volunteers, committee members and board members” This Additional Insured coverage must be at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 2037 forms together if later revisions are used, or the equivalent. In addition, the primacy of coverage must be at least as broad as ISO Form CG 20 01 04 13. The Certificate of Insurance must clearly state how Additional Insured coverage is achieved in the General Liability, Automobile Liability, and Umbrella/Excess Liability policies. Certificates of Insurance must show the form numbers that are used to achieve all of the Additional Insured coverage. A copy of the actual policy language that achieves this coverage in each policy must be provided to the Owner with the Certificate of Insurance. (b) Products & Completed Operations coverages must be maintained in force for a minimum of three (3) years following Final Completion of the Project. (c) Waiver of Subrogation: To the fullest extent permitted by applicable state law, a Waiver of Subrogation Clause shall be added to the General Liability, Automobile, Umbrella/Excess Liability, and Workers Compensation policies in favor of the Town. .2 AUTOMOBILE LIABILITY INSURANCE Bodily Injury and Property Damage, coverage for the Contractor as the owner or the lessee of automobiles, trucks, trailers, self-propelled Contractor’s equipment and all other owned, hired and non- owned vehicles registered for use on the public highway and/or used in operations relating to work under contract. If any such vehicles are to be used to transport hazardous materials, the Contractor shall also provide pollution liability broadened coverage evidenced by ISO Form CA 99 48. The coverage limit applicable shall be the greater of the amounts indicated below or the amount(s) carried by the Contractor: Combined Single Limit $1,000,000 Note: See Section 2.1(b) above for additional insured requirements applicable to Automobile Liability insurance. 63

Page 64

.3 EXCESS LIABILITY AND/OR UMBRELLA LIABILITY applicable to Commercial General Liability and Automobile Liability policies. The Excess Liability and/or Umbrella Liability coverage limits applicable shall be the greater of the amounts indicated below or the amounts carried by the Contractor: Each Occurrence $1,000,000 Aggregate $1,000,000 Note: See Section 2.1(b) above for additional insured requirements applicable to the Excess Liability and/or Umbrella Liability insurance. 4. WORKERS COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE, Must include Waiver of Subrogation in favor of Owner. Coverage required by the laws of New York State as further described below. .1 Requirements. To comply with coverage provisions of Section 57 of the Workers’ Compensation Law, businesses must (1) be legally exempt from obtaining workers’ compensation insurance coverage, (2) obtain such coverage from insurance carriers, or (3) be self-insured or participate in an authorized group self-insurance plan. .2 Coverage Evidence. The Contractor must provide one of the following forms to the Owner, or the current equivalent of any of them in the event of revisions or replacements: (a) Either: CE-200, Affidavit For New York Entities And Any Out Of State Entities With No Employees, That New York State Workers’ Compensation And/Or Disability Benefits Insurance Coverage Is Not Required Or: CE-200, Affidavit That An OUT-OF-STATE OR FOREIGN EMPLOYER Working In New York State Does Not Require Specific New York State Workers’ Compensation And/Or Disability Benefits Insurance Coverage (Affidavits must be stamped as received by the N.Y.S. Workers’ Compensation Board) OR (b) Either: C-105.2, Certificate of Workers’ Compensation Or: U-26.3, New York State Insurance Fund Certificate of Workers’ Compensation Coverage OR (c) Either: SI-12 – Certificate of Workers’ Compensation Self-Insurance, Or: GSI-105.2 – Certificate of Participation in Workers’ Compensation Group Self- Insurance 5. NEW YORK DISABILITY (NYDBL) Coverage required by the laws of New York State as further described below. DISABILITY BENEFITS REQUIREMENTS UNDER WCL SECTION 220 SUBD. 8 .1 Requirements. To comply with coverage provisions of the New York State Disability Benefits Law, businesses must (1) be legally exempt from obtaining disability benefits insurance coverage, (2) obtain such coverage from insurance carriers, or (3) be self-insured. .2 Coverage Evidence. The Contractor must provide one of the following forms to the Owner, or the current equivalent of any of them in the event of revisions or replacements: (a) Either: CE-200, Affidavit For New York Entities And Any Out Of State Entities With No Employees, That New York State Workers’ Compensation And/Or Disability Benefits Insurance Coverage Is Not Required 64

Page 65

Or: CE-200, Affidavit That An OUT-OF-STATE OR FOREIGN EMPLOYER Working In New York State Does Not Require Specific New York State Workers’ Compensation And/Or Disability Benefits Insurance Coverage (Affidavits must be stamped as received by the N.Y.S. Workers’ Compensation Board) OR (b) Either: DB-120.1, Certificate of Disability Benefits Insurance Or: DB-820/829, Certificate/Cancellation of Insurance OR (c) DB-155, Certificate of Disability Benefits Self-Insurance 65

Page 66

AGREEMENT THIS AGREEMENT made on October 23, 2026, between TOWN OF HAMBURG, a municipal corporation formed pursuant to the laws of the State of New York, with a mailing address of 6100 South Park Avenue, Hamburg, New York 14075 (“TOWN”) and Russo Development Inc., with a mailing address of 3710 Milestrip Rd./ Blasdell, NY 14219 (“CONTRACTOR”) agree as follows: 1. SCOPE OF WORK: The Contractor agrees to perform the scope of work as follows: - ¾” curb stop installation on an existing main at 5036 Lakeshore Road, Hamburg. - Materials: curb stop and curb box. - Backfill with materials generated at installation. - Lawn restoration of excavated area. No asphalt or concrete restoration. - Traffic control not included. - Prevailing wage rate and tax-exempt status. 2. COST OF WORK TO BE PERFORMED: -Town shall pay Contractor the sum of $1,490.00 for the work performed. -Contractor shall be responsible for providing the following when performing the services: -Labor, including, but not limited to, employees, subcontractors and any other individuals or agents. -Materials, including, but not limited to, all supplies and products. -Equipment, including but not limited to, machinery, accessories. 3. LOCATION: The primary location for the work to be completed by the Contractor is: In front of 5036 Lakeshore Rd. (Twin Willows), Hamburg, New York 4. Commencement date: The Contractor will begin on:_________________________ 5. Completion Date: The Contractor will be required, unless otherwise stated under the terms of this Agreement to complete the work by:_______________________ 6. INSURANCE: The Contractor shall comply with all Town insurance requirements on the attached “Exhibit A – Insurance Requirements,” which is incorporated by reference herein and 66

Page 67

made a part of this Agreement. Prior to commencement of the work, Contractor shall provide to the Town evidence, including without limitation certificates of insurance, of all insurance coverages outlined on the attached “Exhibit A – Insurance Requirements,”. 7. HOLD HARMLESS/INDEMNITY: The Contractor shall, to the fullest extent permitted by law, and at its expense, defend, indemnify, and hold the Town of Hamburg, its officers, employees and agents, harmless from and against any and all liability, loss, expense, damage, or claims for injury or damages of any kind, including reasonable attorneys' fees, arising out of the work performed by the Contractor. 8. ADDITIONAL PROVISIONS: ______________________________________ IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed by subscribing the same, this _______day of ______________, 2026 TOWN OF HAMBURG BY: ________________________________ Elizabeth Farrell-Lorentz, Supervisor CONTRACTOR BY: _______________________________ Name, Title 67

Page 68

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.18. B&G PAF BE IT RESOLVED, that the Town Board approves the termination and hiring of the following employees in Buildings & Grounds. ATTACHMENTS: signed BG PAF 11-2-26.pdf 68

Page 69

69

Page 70

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.19. Youth, Recreation, & Senior Services P.A.F. BE IT RESOLVED, that the Town Board approve the termination and hiring of personnel for the Youth, Recreation & Senior Services Department as attached. ATTACHMENTS: scan_2026_10_28_11_49_44_463.pdf 70

Page 71

71

Page 72

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.20. POLICE – Agreement with Auctions International WHEREAS, the Asset Disposition Policy states all assets shall be disposed of in accordance with the Town Sale of Surplus Property Policy, and NOW THEREFORE, BE IT RESOLVED, the Town Board authorize the Town of Hamburg Police Department to enter into a contract with Auctions International for the disposal of excess equipment and supplies. ATTACHMENTS: Online Auction Contract 11-2-2026.pdf 72

Page 73

73

Page 74

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.21. Cutting and removal of dead trees WHEREAS, on October 19, 2026 the Town of Hamburg Board approved the removal of dead trees located on a vacant parcel SBL 160.14-1-27 per the Town of Hamburg Code Chapter 90 Dead Trees, and, WHEREAS, the Code Enforcement Department obtained two quotes for the removal of the trees as follows: Branch Managers, INC. $4,250.00 Davey $6,500.00 , and, NOW THEREFOR BE IT RESOLVED, that the Town Board authorizes Branch Managers, INC. to remove the dead trees from parcel SBL 160.14-1-27. Funds are available to be charged to Clean up of properties A3620.469 ATTACHMENTS: DOC102826-10282026124227.pdf 74

Page 75

75

Page 76

76

Page 77

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.22. Award Demolition Contractors for 6817 Boston State Rd. WHEREAS, the Town of Hamburg Code Chapter 80 references the procedure for unsafe buildings in the Town of Hamburg, and, WHEREAS, the Town of Hamburg Board deemed the structures 6817 Boston State Rd. unsafe and ordered the demolition of the structures on the property, and, WHEREAS, Bids for a demolition contractor where publically opened and quotes for an air monitoring company were received as follows: Demolition Contractors Hannah Demolition $19,500.00 Geiter Done of WNY INC. $34,000.00 Air monitoring companies 56 Services $2,610.00 , and, BE IT RESOLVED, that the Town Board approves Hannah Demolition as the demolition contractor and 56 Services as the air monitoring company for the demolition of 6817 Boston State Rd. The demolition will begin after December 1st 2026, and, BE IT FUTHER RESOLVED, that the Town Supervisor sign any contracts required for the demolition, and, BE IT FINALLY RESOLVED, that the Town Board shall levy the costs incurred for the demolition upon the land on which the unsafe structures are located. 77

Page 78

ATTACHMENTS: DOC102926-10292026094602.pdf 78

Page 79

79

Page 80

80

Page 81

81

Page 82

82

Page 83

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.23. Award Demolition Contractors for 6310 Southwestern Blvd. WHEREAS, the Town of Hamburg Code Chapter 80 references the procedure for unsafe buildings in the Town of Hamburg, and, WHEREAS, the Town of Hamburg Board deemed the structures located at 6310 Southwestern Blvd. unsafe and ordered the demolition of the structures on the property, and, WHEREAS, Bids for a demolition contractor were publicly opened and quotes for an air monitoring company were received as follows: Demolition Contractors Geiter Done of WNY INC. $32,000.00 Regional Environmental Demolition INC $59,253.00 EBD Construction Services $73,900.00 Air monitoring companies Advanced Contracting Services $3,000.00 56 Services $4882.00 , and, BE IT RESOLVED, that the Town Board approves Geiter Done of WNY INC as the demolition contractor and Advanced Contracting Services as the air monitoring company for the demolition of structured at 6310 Southwestern Blvd., and, BE IT FUTHER RESOLVED, that the Town Supervisor sign any contracts required for the demolition, and, 83

Page 84

BE IT FINALLY RESOLVED, that the Town Board shall levy the costs incurred for the demolition upon the land on which the unsafe structures are located. ATTACHMENTS: DOC102926-10292026095252.pdf 84

Page 85

85

Page 86

86

Page 87

87

Page 88

88

Page 89

89

Page 90

90

Page 91

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.24. Award Demolition Contractors for 5272 South Park Ave. WHEREAS, the Town of Hamburg Code Chapter 80 references the procedure for unsafe buildings in the Town of Hamburg, and, WHEREAS, the Town of Hamburg Board deemed the chapel of the main building and the detached greenhouse structures at 5272 South Park Ave. unsafe and ordered the demolition of those structures, and, WHEREAS, Bids for a demolition contractor were publicly opened and quotes for an air monitoring company were received as follows: Demolition Contractors Regional Environmental Demolition INC. $172,752.00 with an allowance of $40,000.00 extra for the shoring and board up of the main structure after demolition. Air monitoring companies Advanced Contracting Services $10,000.00 56 Services $11,632.00 Stohl Environmental $13,250.00 , and, BE IT RESOLVED, that the Town Board approves Regional Environmental Demolition INC as the demolition contractor and Advanced Contracting Services as the air monitoring company for the demolition of the chapel of the main building and the detached greenhouse located at 5272 South Park Ave., and, BE IT FUTHER RESOLVED, that the Town Supervisor sign any contracts required for the demolition, and, 91

Page 92

BE IT FINALLY RESOLVED, that the Town Board shall levy the costs incurred for the demolition upon the land on which the unsafe structures are located. ATTACHMENTS: DOC102926-10292026101931.pdf 92

Page 93

93

Page 94

94

Page 95

95

Page 96

96

Page 97

97

Page 98

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.25. Ice Rink Equipment Cover Design WHEREAS, the Town of Hamburg ice rink has a large equipment pad in the rear of the building, which is impacted by snow sliding off the roof, and WHEREAS, last winter this resulted in a damaged gas pipe and prompted the need for a permanent structure to cover the area; and WHEREAS, the Town Engineer has worked with a local architect, Michael E. Lukaszewski, R.A., who has submitted a proposal for $6,900 to design a structure, columns and foundations. NOW THEREFORE BE IT RESOLVED, that the Town Board authorizes the Supervisor to enter into an agreement with Michael E. Lukaszewski, R.A. for not-to-exceed $6,900 and work to begin immediately. Funds are available in H.21.7141.0303 ATTACHMENTS: Town of Hamburg Recreation Center 10-27-2026.pdf 98

Page 99

Michael Lukaszewski, Architect P.O. Box 1046, Orchard Park, NY 14127 phone (716) 923-3300 [email protected] October 27 2026 Attn: Camie Jarrell Via email [email protected] Re: Town of Hamburg Recreation Center 2982 Lakeview Road, Hamburg NY 14075 New roof structure At Equipment I am pleased to offer this letter of proposal to provide architectural services for the above-mentioned project. I feel that I have a good understanding of what you are hoping to accomplish with this new structure. A. Project Scope Services will include complete Structural and Architectural documentation; to include Floor Plans and Details, Exterior Elevations, Wall Sections and Details as required. B. Basic Services  Architectural Design of new roof structure approximately 16’-0’ x 45’-0” in size  Complete Structural design included – new roof structure to be freestanding and will not depend on existing building for structural support  Architect / Engineer stamped drawings will be provided for your use C. Architectural Services and Responsibilities 1. Construction Document a. Construction Documents and Specifications will be completed to a level to allow for competitive bidding and securing a building permit from the Town. b. Architectural Documents to include  Floor Plans  Exterior Elevations  Wall Sections and Details  Roof Plan  Framing plan and connection details 2. Contract Administration Phase a. During this phase, one site visit will be provided and scheduled during completion of critical construction elements. b. If necessary, the architect will provide clarification to the contract documents P.O. Box 1046, Orchard Park, NY 14127 99

Page 100

Michael E. Lukaszewski, RA D. Owners and Responsibilities The following items are to be provided by the property owner if available: 1. Property Survey if needed (not anticipated) 2. Additional contract costs related to the completion of the project detailed below. E. Additional Costs not Included in Contract Fees 1. Permit Fees 2. Soil boring / geotechnical report if required a. Soil borings will not be required to design the structure. 3. Extensive Construction Administration – not anticipated however I am available for questions throughout the project 4. Any variances required – none are anticipated 5. Construction cost estimating is not included F. Fees The proposed sum based upon the Scope of Work described herein, totals: Not to exceed cost $6,900 This proposal is valid for sixty (60) days from the date noted on the cover letter. If this document is not executed within this time period, revision will be necessary prior to final submission. Revisions to the project above and beyond the initial intent of the project will be subject to additional fees. I hope that this proposal meets with your approval and I look forward to working together. Sincerely, Accepted ____________________________________ _________________________________________ Michael E Lukaszewski, R.A. P.O. Box 1046, Orchard Park, NY 14127 100

Page 101

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.26. Authorize the Town Supervisor to sign the Proposal with Fisher & Associates RESOLVED, the Hamburg Town Board authorizes the Town Supervisor to sign the Proposal with Fisher & Associates for Conceptual Multimodal Design on South Park Ave. from Scranton to Bayview Rd. and Bayview to Big Tree Rd., including in the vicinity of Frontier High School to address infrastructure and safety issues in preparation for funding support application submissions, not to exceed to $8,000. Funds available in B.8020.0456.0403 ATTACHMENTS: DOC102926-004.pdf 101

Page 102

102

Page 103

103

Page 104

104

Page 105

105

Page 106

106

Page 107

107

Page 108

108

Page 109

109

Page 110

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.27. Authorizing the Non-Renewal of the Contract with Granicus at CARAHSOFT WHEREAS, the Town of Hamburg implemented live streaming services for Town meetings during the COVID-19 pandemic to provide residents with a means of viewing and accessing meetings remotely; and WHEREAS, live streaming is not mandated by New York State law and was implemented as a courtesy to Town residents to improve public access during limited in-person participation; and WHEREAS, the Town of Hamburg entered into an agreement with Granicus at Carahsoft in December 2024 for the purpose of live streaming Town Board and Planning Board meetings; and WHEREAS, the current agreement is scheduled to expire on December 31, 2026; and WHEREAS, due to financial considerations and the limited viewership of the services provided, the Town Board has determined that continuing the agreement would not be in the best financial interest of the Town; and WHEREAS, the Town Board desires to provide formal written notice to Granicus at Carahsoft of the Town’s decision not to renew the agreement in accordance with the notice requirements set forth in the contract; NOW, THEREFORE, BE IT RESOLVED, that the Town Board of the Town of Hamburg hereby authorizes the Supervisor to sign and submit a formal non-renewal contract notice to Granicus at Carahsoft effective December 31, 2026. 110

Page 111

Town Board of the Town of Hamburg November 2, 2026 Meeting 4.28. Network Equipment Upgrade WHEREAS, the Town of Hamburg needs to upgrade network equipment townwide, and WHEREAS, the equipment will cost $464,238.64 and is on NCPA Contract (#01-125) and NCPA Contract (#01-97), and WHEREAS, the equipment will be financed through Extreme Capital Services for a 60-month term, with a monthly payment of $8,885.15, and NOW, THEREFORE BE IT RESOLVED, that the Town Board approves authorizing the Supervisor to sign the finance agreement with Extreme Capital Services. Funds are available in account A.1690.0207.1 111