Draft Local Law for Battery Energy Storage Systems (full text)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Page 1
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
TOWN OF WALES
LOCAL LAW 2026-5
Local Law Entitled
Regulation of Battery Energy Storage Systems (BESS)
97A LOCAL LAW, TO AMEND LOCAL LAW #1-1984 KNOWN AS “ADOPTION OF CODE”, ADOPTED
BY THE TOWN BOARD OF WALES ON DECEMBER 29, 19, BY THE ENACTMENT OF A CHAPTER
ENTITLED “REGULATION OF BATTERY ENERGY STORAGE SYSTEMS”
BE IT ENACTED BY THE TOWN BOARD OF THE TOWN OF WALES OF A CHAPTER 197 ENTITLED
"REGULATION OF BATTERY ENERGY STORAGE SYSTEMS" AS FOLLOWS:
Section 1; LEGISLATIVE INTENT
This Local Law will amend the Code by the enactment of regulations andd provisions for the land use and
operation and regulation of Battery Energy Storage Systems. ‘.
Section 2: Authority
This Battery Energy Storage System Law is adopted pursuant to ‘Article Ix of the New York State Constitution,
§2(c)(6) and (10), New York Statute of Local Governments, §'10 (1) and (7); sections 261-263 of the Town
Law, and section 10 of the Municipal Home Rule Law of the State of New York, which authorize the Town
of Wales to adopt zoning provisions that advance and protect the: health, safety and welfare of the
community. So
Section 3: CHAPTER 197
Chapter 197 shail be enacted as part of the Code of the Town of Wales entitied “Battery Energy Storage
Systems". : ened
Ys, ARTICLE|
“"<. GENERAL PROVISIONS
Section 197-1 Statement of Purpose and Intent
This Battery Energy Storage System Law is adopted to advance and protect the public health, safety,
welfare, and quality of life of the Town of Wales by creating regulations for the installation and use of
battery energy storage systems, with the following objectives:
A. To provide a regulatory scheme for the designation of properties suitable for the location,
construction and operation of battery energy storage systems;
B. Toensure compatible land uses in the vicinity of the areas affected by battery energy storage
systems;
C. Tomitigate the impacts of battery energy storage systems on environmental resources such as
important agricultural lands, forests, wildlife and other protected resources; and
D. Tocreate synergy between battery energy storage system development and other goals of the
~ BATTERY ENERGY STORAGE SYSTEMS
Page 2
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
Town of Wales pursuant to the Town of Wales Comprehensive Plan and the Town of Wales
Agriculture and Farmland Protection Plan (AFPP).
E. To define battery storage system size and use “tiers” which shail determine the type of
permitting mechanism required in the Town of Wales, and the administrative procedure
required for an application, application approval, and defining any conditions which shall apply
to the approved application for a battery energy storage system in the Town.
Section 197-2: Findings:
The Town Board of the Town of Wales recognizes that Battery Energy Storage Systems (BESS) are an
effects on privacy, neighborhood character, and the predominantly rural, agricultural, and forested areas
of the Town. The Board also acknowledges that BESS installations may offer benefits, such as increased
tax revenue, the possibility of a “Payment in Lieu of Taxes” (PILOT) agreement, and limited employment
opportunities related to operations and maintenance. oe
Section 197-3: Definitions
The following definitions shall apply to this Chapter:
ANSI: American National Standards Institute pee
BATTERY (IES): A single cell or a group of cells connected together electrically in series, in parallel, ora
combination of both, which can charge, discharge, and store energy electrochemically. For the purposes
of this law, batteries utilized in consumer products are excluded from these requirements.
BATTERY ENERGY STORAGEMANAGEMENT SYSTEM: An electronic system that protects energy
storage systems from operating outside their safe operating parameters and disconnects electrical
power to the energy storage ven or places itiina safe condition if potentially hazardous temperatures
or other conditions are detected. .
BATTERY ENERGY STORAGE SYSTEM: ‘One or more devices, assembled together, capable of storing
energy in orderto supply electrical energy at a future time, not to include a stand-alone 12-volt car battery
or an electric motor vehicle. A’ battery: energy storage system is classified as a Tier 1 or Tier 2 Battery
Energy Storage System (BESS) as. follows:
A. Tier ‘1.Battery Energy Storage Systems have an aggregate energy capacity less
~ than or-equal to 600kWh and, if in a room or enclosed area, consist of only a single
energy storage system technology. Generally, Tier 1 BESS would service a
~.. residential situation, or a small commercial land use and would be considered a
private. system for the benefit of the landowner or business owner.
By Tier 2 Battery Energy Storage Systems have an aggregate energy capacity greater than
, 600kWh or are comprised of more than one storage battery technology in a room or
*. enclosed area. It is generally considered that the Tier 2 BESS are larger in scope, likely
“consume substantial power from the grid, and supply the grid with substantial energy
during the battery discharge cycle. These systems would be considered as “grid-
connected” Utility-Scale BESS and subject to additional permitting and project review.
CELL: The basic electrochemical unit, characterized by an anode and a cathode, used to
receive, store, and deliver electrical energy.
COMMISSIONING: A systematic process that provides documented confirmation that a battery
energy storage system functions according to the intended design criteria and complies with
applicable code requirements.
DEDICATED-USE BUILDING: A building that is built for the primary intention of housing battery
TOWN OF WALES ~ BATTERY ENERGY STORAGE SYSTEMS 2
Page 3
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
energy storage system equipment, is classified as Group F-1 occupancy as defined in the
International Building Code, and complies with the following:
1. The building’s only use is battery energy storage, energy generation, and other electrical grid-
related operations.
2. No other occupancy types are permitted in the building.
3. Occupants in the rooms and areas containing battery energy storage systems are limited to
personnel that operate, maintain, service, test, and repair the battery energy storage system and
other energy systems.
4. Administrative and support personnel are permitted in areas within the buildings that do not
contain battery energy storage system, provided the following:
a. The areas do not occupy more than 10 percent of the building area
2 of the story iin which
they are located. :
b. A means of egress is provided from the administrative and sis use areas to the
energy storage systems or other energy system equipment.
ENERGY CODE: The New York State Energy Conservation Construction Code adopted pursuant to
Article 11 ofthe Energy Law, as currently in effect and as hereafter: amended from time to time.
FIRE CODE: The fire code section of the New York State. Uniform Fire Prevention and Building Code
adopted pursuant to Article 18 of the Executive Law, as currently |in. effect and as hereafter amended
from time to time. 5
NATIONALLY RECOGNIZED TESTING LABORATORY (NRTL): AU.S. Department of Labor designation
recognizing a private sector organization to perform certification: for certain products to ensure that they
meet the requirements of both the construction and general industry OSHA electrical standards.
NEC: National Electric Code.
NFPA: National Fire Protection: Association.
NON-DEDICATED-USE BUILDING: All buildings that contain a battery energy storage system and do
not comply with the dedicated- -use building requirements.
NON- PARTICIPATING PROPERTY: Any property that is not a participating property.
NON- PARTICIPATING RESIDENCE: ‘Any residence located on non-participating property.
OCCUPIED COMMUNITY BUILDING: Any building in Occupancy GroupA, B, E, i, R, as defined in the
International Building Code, including but not limited to schools, colleges, daycare facilities, hospitals,
correctional facilities, public libraries, theaters, stadiums, apartments, hotels, and houses ofworship.
“PARTICIPATING PROPERTY: A battery energy storage system host property or any real property that
is the subject of an agreement that provides for the payment of monetary compensation to the
landowner from the battery energy storage system owner (or affiliate) regardless of whether any part of
a battery.energy. storage system is constructed on the property.
UNIFORM CODE: the New York State Uniform Fire Prevention and Building Code adopted
pursuant to Articie 18 of the Executive Law, as currently in effect and as hereafter amended from
time to time.
TOWN OF WALE
Page 4
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
Section 197-4. USE DISTRICTS AND BATTERY ENERGY STORAGE SYSTEM (BESS)
CATEGORIES & AUTHORITY:
For the Town of Wales, the following categories of use and general permitting characteristics are
tabulated in the Town of Wales Zoning Chapter 200, which defines Permitted Principal and Accessory
Uses for each Zoning District. For each Zoning District the Zoning Chapter 200 the permitted land use
for Battery Energy Storage Systems is recited. Chapter 200 should be consulted for that information in
the relevant sections for Residential (R1 & R2 & RRB), Commercial (C), or Agricultural (Ag) Zoning
Districts within the Town.
Section 197-5: Applicability
A. The requirements of this Local Law shall apply to all battery energy storage systems -
permitted, installed, or modified in the Town of Wales after the effective date: -of this Local:
Law, excluding general routine maintenance and repair. :
B. Battery energy storage systems constructed or installed priorto. the effective ‘date of this Local
Law shall not be required to meet the requirements, of this Local Law unless modified or
altered. AE 7 ‘.
C. Modifications to, retrofits, or replacements of an existing battery energy
e wy storage system that
increase the total battery energy storage system designed discharge duration or power
rating shall be subject to this Local Law.
Section 197-6: General Criteria and Requirements”:
A. Abuilding permit and an electrical inspection/approval shall be required for installation of ail battery
energy storage systems. =
B. Issuance of permits and-approvals by the Wales Code Enforcement Officers, and the
Wales Town Board after consideration of delegated advisory reports from the Wales
Planning Board and Wales: Environmental Board, shail include review pursuant to the State
Environmental Quality Review Act ECL Article 8 and its implementing regulations at 6
NYCRR Part 617 (‘SEQRA’) as currently in effect and as hereafter amended from time to
time. The Wales Town Board will act as Lead Agency during the SEQRA procedures.
C. All battery energy storage systems, all Dedicated Use Buildings, and all other buildings or
structures: that: ce
1) Contain or: are otherwise associated with a battery energy storage system and
. 2 Subject. to the Uniform Code and/or the Energy Code shall be designed, erected, and
__ installed:in accordance with all applicable provisions of the Uniform Code, all applicable
~- provisions of the Energy Code, and all applicable provisions of the codes, regulations, and
» industry standards as referenced in the Uniform Code, the Energy Code, and the Town of
“., Wales Code.
ARTICLE Il
PERMIT REQUIREMENTS
Section 197-7: Permitting Requirements for Tier 1 Battery Energy Storage Systems (s 600 kWh)
Tier 1 Battery Energy Storage Systems shall be permitted in all zoning districts, subject to the Town of
Wales Uniform Code “Battery Energy Storage System (BESS) Permit’. Tier 1 BESS are less than or
TOWN OF WALES
Page 5
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
equai to 600 kWh capacity, are generally exempt from site plan review, since Tier 1 systems are smaller
residential or small commercial systems for homes and businesses and they are processed by the
Wales BESS Permit and the related Town of Wales Building Permits. This procedure is via the
Town of Wales Code Enforcement Department. It is anticipated that most, if not all, residential and
commercial installations of a Tier 1 BESS will be designed, installed, and commissioned by a
professional contractor which has expertise and design experience to supply suitable technical and
engineering details for review by the Town of Wales staff. It is assumed that submissions will be
prepared by a NYS Licensed Design Professional (Professional Engineer, Registered Architect,
Professional Land Surveyor, etc.). To have the Tier 1 Application process be efficient, and non-
piecemeal, submissions of Tier 1 BESS applications the submittal requirements are:presented in
summary below for Tier 1 installations less than or equal to 600 kWh capacity. . ©
The submitted Applications for the installation of Tier 1 Battery Energy Storage System shall be:
1. Reviewed by the Code Enforcement Department for completeness. in some
circumstances the Code Enforcement Department may make a referral to the
complete when it addresses all matters listed in this Local Law including, but not
necessarily limited to,
a. Include a legend or key for the site and floor plan with equipment symbols,
b. The site plan shall include a professional survey, signed and sealed by a licensed
NYS Professional Land Surveyor, with. markings | to show:
i. The location of the structure and the location where the system is to be
installed.
ii Show conduit/cable. routing of battery energy storage system.
iii. Include underground trench detail, if applicable.
iv. Show overhead runs, if applicable:
Vv. Show method and location of required ventilation equipment (if
required) for indoor installations.
c. Identify the total number of: batteries for the BESS and location on the site plan
andd floor plan. ,
a ‘New equipment for the battery energy storage system.
a Existing equipment for interconnection.
iti. ; Show required working clearances for all existing/new electrical
equipment.
. Sy iv. Show whether the equipment is to be installed indoors or outdoors.
“ve. Show method and location of requirement ventilation equipment (if
~ required) for indoor installations.
yi. Show method of protection from physical damage for the battery energy
storage system.
vii. Show means of access to battery energy storage system.
Vii. Denote whether conductors are routed indoors or outdoors.
e. Provide an elevation drawing of the system equipment and specify elevation in
relation to flood plains.
i. If the house is in a flood zone, it shall be above base flood elevation.
f. Provide supporting documents from manufacturer if equipment is subject to
physical damage.
g. Electrical Compliance Confirmation, to include but not limited to:
i. Installations shall be in compliance with the Battery Energy Storage
TOWN OF WALES ~ BATTERY ENERGY STORAGE SYSTEMS
Page 6
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
System Inspection Checklist. The Battery Energy Storage System
inspection Checklist provides an overview of common points of inspection
that the applicant should be prepared to show compliance.
Plans shall include a note that a plug-in type back-fed circuit breakers
connected to an interconnected supply shall be secured in in accordance
with (NEC 408.36(D)).
Provide a permanent plaque or directory denoting all electric power
sources on or in the premises, which shall be installed at the main
service panel and at all locations of all electric power production
sources capable of being interconnection (e017 NEC. N 106. 11).
One or Three-Line Diagram
Show grounding and bonding for the battery: energy storage: system,
including the ground return path. Q
vi. Show method of interconnection.
Vii. Show overcurrent protection method and rating when required.
viii. include detailed wiring information for all new cirouits,including:
Conductor size/type ne
Number of conductors
xi. Conduit size
Xi. Conduit type :
xiii. Show all disconnection means. :
xiv. Show ratings (voltage; ‘ampacity ; ‘environmental, etc) for new and
existing service equipment...
XV. Specifications and installation: ‘instructions
xvi. Prepackaged and pre-engineered battery energy storage systems shail
be. installed in accordance with their listing and the manufacturer's
instructions. -
xvii Provide specifi cation sheets and installation instructions for the
». following: ‘equipment:
xviii Batteries a
xix. _ Inverter.
~ “Transformer or autotransformer
Transfer switch(es)
ESS support or racking
Converters
Interconnecting cables and connectors
Management system, including charge controller(s)
XXVi. Panelboards
XXvil. HVAC/thermal management system
xXxviil. Fire rated material
XXX, Storage batteries and battery storage systems shall comply with the
following:
Storage batteries shall be listed in accordance with UL 1973
Prepackaged and pre-engineered battery energy storage systems shall
be listed in accordance with UL 9540. Exception: Lead-acid batteries
are not required to be listed
TOWN OF WALES — BATT ERGY STORAGE SYSTEMS 6
Page 7
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
XXxXil. An approved energy management system shall be provided for battery
technologies other than lead-acid and nickel cadmium for monitoring
and balancing cell voltages, currents, and temperatures within the
manufacturer's specifications. The system shall transmit an alarm
signal to an approved location if potentially hazardous temperatures or
other conditions such as short circuits, over voltage or under voltage
are detected.
h. Structural Requirement Compliance:
i. If the battery energy storage system is wall mounted and its weight is
more than 200 pounds, provide structural details in: the drawings and
calculations as a separate document (Uniform Cede). ©
il. If multiple battery energy storage systems are:installed and the
combined weight is 400 pounds or more, provide structural details in
the drawings and calculations as a separate document (Uniform Code).
2. Utility Lines and Electrical Circuitry. All on-site utility lines shall be placed
underground to the extent feasible and as permitted: by the. serving utility, especially
in the case of residential or commercial sites which require’new or upgraded
infrastructure from the serving utility. Exceptions are allowed for the main
disconnect, if any, at the utility company. right-of-way and any new interconnection
equipment, including without limitation any. Poles, with new easements and right-of-
way. one oe SS .
3. Signage. No permanent BESS signage
s at the rode. or in or near the roadway right
of way is permitted, with the exception of temporary promotional advertisement for
the project contractor during, or immediately following the site’s commissioning.
The presence of any promotional signis. limited to 60 days after approval and
closeout of the Town: of Wales permits.
Section 197-8: Permitting Reauiterents for Tier 2 Battery Energy Storage Systems (> 600kWh)
Tier 2 Battery Energy: Storage systems are permitted only through the issuance of a Special
Use Permit and may. only be considered within the Agricultural (Ag) zoning district. Tier 2
BESS projects are larger, potentially Utility-Scale Systems, and shall be subjectto the Uniform
Code and the: tigorous site plan review and application requirements set forth in this Section.
Tier 2 applications via Special Use Permits, must be in full compliance with all submission
requirements before they shall. be considered a “complete application” by the reviewing
agencies in Wales.
A Applications for. the installation of Tier 2 Battery Energy Storage System shall be:
4, Reviewed by the Code Enforcement Department, the Wales Planning Board, and the
oe Wales Environmental Board for completeness. An application shall be deemed
“complete when it addresses ail matters listed in this Local Law including, but not
necessarily limited to,
(a) Supply of a professional land survey, showing all parcels involved with the
project with nearby adjoining parcels indicated clearing showing the location of
buildings and dwellings on those adjoining parcels. The survey must be signed
and sealed by a NYS licensed Professional Land Surveyor.
(b) Compliance with all applicable provisions of the Uniform Code and all applicable
provisions of the Energy Code confirmed by a NYS Licensed design
professional, such as a Professional Engineer, a Registered Architect, or a
TOWN OF WALES ~ BATTERY ENERGY STORAGE SYSTEMS
Page 8
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
Professional Land Surveyor.
(c) Matters relating to the proposed battery energy storage system characteristics,
(d) Floodplain,
(e) Utility Lines,
(f) Electrical Circuitry,
(g) Signage,
(h) Lighting,
(i) Vegetation and Tree cutting,
(j) Noise, a
(k) Vehicles plan with entry and egress provisions clearly shown,
(l) Traffic Assessment, including Prediction studies for Traffic Volume and Traffic
Vehicle Size, as determined to be necessaryyby the, Town: Sh,
years for covering estimated costs and the amount of: the bond must be
adjusted in the event that the bond value.no longer covers a realistic
decommissioning/remediation ‘cost going forward in time The bond must be in
a form and means acceptable to the Wales Town Attorney, including
provisions defined for liquidation of. the bond ‘by the Town when necessary.
(n) SitePlan during Development,
(0) Site Plan at completion Post-Commissioning
(p) Special Use Permit Compliance, - :
(q) Development Schedule of Project Milestones,
(n). Ownership Changes: as applicable or planned,
6ss) Safety, ~
0) Permit Time Frame for project start and completion,
| < z w ): Abandonment and Contingency Plans.
° Applicants shall be advised within 45 business days of the completeness of their
application, or of any deficiencies that must be addressed prior to substantive review.
2. Be subject to a public hearing to hear all comments for and against the application. The
Town Board of the Town of Wales shall have a notice printed in a newspaper of general
circulation in the Town at least 10 days in advance of such hearing. Applicants shall have
delivered the notice by first class mail to adjoining landowners or landowners within 1,000
feet of the property at least 14 days priorto such a hearing. Proof of mailing shail be provided
to the Town Board at the public hearing.
3. Referral to the Erie County Department of Environment and Planning pursuant to General
Municipal Law § 239-m.
4. Upon closing of the public hearing, the Town Board shall take action on the application within
OWN OF WALIES ~ BATTERY ENERGY STORAGE SYSTEMS
Page 9
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
62 days of the public hearing, which can include approval, approval with conditions, or denial.
The 62-day period may be extended upon consent by both the Town Board and the
Applicant.
B. Utility Lines and Electrical Circuitry. All on-site utility lines shall be placed underground to the
extent feasible and as permitted by the serving utility, with the exception of the main service
connection at the utility company right-of-way and any new interconnection equipment,
including without limitation any poles, with new easements and right-of-way.
C. BESS Signage.
1. The signage shall be in compliance with ANSI Z535 and shall include the type of technology
associated with the battery energy storage systems, any special hazards associated, the
type of suppression system installed in the area of battery energy-storage systems, and 24-
hour emergency contact information, including reach-back phone: number,
2. As required by the NEC, disconnect and other emergency shutoff information shall be clearly
displayed on a light reflective surface. A clearly visible warning:sign concerning voltage shall
be placed at the base of all pad-mounted transformers and ‘substations.
D. Lighting. Lighting of the battery energy storage systems shall be limited to that .
minimally required for safety and operational purposes and shall be (easonably
shielded and downcast from abutting properties. es :
E. Vegetation and tree-cutting. Areas within. 50. feet on: each side of Tier 22 Battery Energy Storage
Systems shall be cleared of combustible: vegetation and other combustible growth. Single
specimens of trees, shrubbery, or cultivated ground cover such as green grass, ivy, succulents,
or similar plants used as ground covers shall be permitted to be exempt provided that they do not
form a means of readily transmitting fire. Removal: of trees should be minimized to the extent
possible. :
F. Noise. The 1-hour average noise generated from the battery energy storage systems,
components, and associated ancillary equipment shall not exceed a noise level of 60 dBA as
measured at the’ property line / boundary line of any non-participating residence or occupied
community building adjoining. or adjacent parcel. Applicants may submit equipment and
component manufacturers noise ratings to demonstrate compliance and a NYS Licensed
Professional Engineer certification is supplied which indicates that the manufacturer's ratings
are technically valid and applicable for the specific site plan of the BESS project. The applicant
may.be required to provide Operating Sound Pressure Level measurements from a reasonable
number of sampled locations at the parcel’s perimeter of the battery energy storage system to
demonstrate compliance with this standard.
9
~ G, ‘Decominissi i
“4. Decommissioning Plan. The applicant shall submit a decommissioning plan, developed in
“accordance with the Uniform Code, to be implemented upon abandonment and/or in
conjunction with removal from the facility. The decommissioning plan shall include:
(a) Anarrative description of the activities to be accomplished, including who will perform
that activity and at what point in time, for complete physical removal of all battery
energy storage system components, structures, equipment, security barriers, and
transmission lines from the site;
(b) Disposal of ail solid and hazardous waste in accordance with local, state, and federal waste
disposal regulations;
(c) The anticipated life of the battery energy storagesystem;
TOWN OF WALES ~ BATTERY ENERGY STORAGE SYSTEMS g
Page 10
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
(d) The estimated decommissioning costs and how said estimate was determined;
(e) The method of ensuring that funds will be available for decommissioning and restoration;
(f) The method by which the decommissioning cost will be kept current;
(g) The manner in which the site will be restored, including a description of how any
changes to the surrounding areas and other systems adjacent to the battery energy
storage system, such as, but not limited to, structural elements, building
penetrations, means of egress, and required fire detection suppression systems, will
be protected during decommissioning and confirmed as being acceptable after the
system is removed; and
(h) A listing of any contingencies for removing an intact operational energy storage
system from service, and for removing an energy storage syetem from service that
has been damaged by a fire or other event.
(i) The Plan shall illustrate that the decommissioning costs ‘are properly covered in the
applications submission of a bond in an amount adequate to: fully cover decommissioning
costs, including remediation and restoration. of.land to the pre-BESS condition(s). The
value of the bond evaluated every 5 years: for covering estimated costs and the amount
of the bond must be adjusted in the event that the ‘bond value no longer covers a realistic
decommissioning/remediation cost going forward in time The bond must be in a form
and means acceptable to the Wales Town. Attorney, including provisions defined for
liquidation of the bond by the Town when necessary.
2. Decommissioning Fund. The owner and/or Operator ofthe energy storage system, shall
continuously maintain a fund or bond payable tothe Town of Wales, in a form approved by the
Town for the removal of the battery energy storage. system, in an amount to be determined by the
Town of Wales, for the period of the life of the facility. This fund may consist of a letter of credit
from a State of New York licensed-financial institution. All costs of the financial security shall be
borne by the applicant.” oe se
H. Site plan application: All Tier 2 Battery Energy Storage Systems shall require a Special Use Permit,
and site plan approval shallbe required, relevant submissions under NYS SEQRA, and including
submission of any and all supplemental data, design details, and drawings which are requested by
the Town of. Wales Planning Board, the Wales's Town Engineer, or the Wales Town Board before an
application is deemed complete and ready for ultimate action by the Town Board. Any site plan
application: shall include, asa minimum, the following information:
1 * Property lines and. -physical features, including roads, for the project site on a survey produced,
signed and sealed, by a licensed NYS licensed Registered Professional Land Surveyor (RPLS).
2. . Proposed changes to the landscape of the site, grading, vegetation clearing and planting,
- ‘exterior lighting, and screening vegetation or structures.
3. A three-line electrical diagram detailing the battery energy storage system layout, associated
components, and electrical interconnection methods, with all National Electrical Code compliant
disconnects and over current devices.
4. Apreliminary equipment specification sheet that documents the proposed battery energy
storage system components, inverters and associated electrical equipment that are to be
installed. A final equipment specification sheet shall be submitted prior to the issuance of
building permit.
5. Name, address, and contact information of proposed or potential system installer and the owner
TOWN OF WALES ~ BATTERY ENERGY STORAGE SYSTEMS 1
Page 11
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
and/or operator of the battery energy storage system. Such information of the final system
installer shall be submitted prior to the issuance of building permit.
6. Name, address, phone number, and signature of the project Applicant, as well as all the
property owners, demonstrating their consent to the application and the use of the property for
the battery energy storage system.
7. Zoning district designation for the parcel(s) of land comprising the project site.
8. Commissioning Plan. Such plan shall document and verify that the system andits associated
controls and safety systems are in proper working condition per requirements set forth in the
Uniform Code. Where commissioning is required by the Uniform Code, Battery energy storage
system commissioning shall be conducted by a New York State(NYS) Licensed Professional
Engineer (P.E.) after the installation is complete but priorto final inspection and approval: A
corrective action plan shall be developed for any open or continuing issues that are allowed to be
continued after commissioning. A report describing the results of the system commissioning and
including the results of the initial acceptance testing required in the Uniform Code shall be provided
to the Wales Code Enforcement Department and Wales Planning Board: for advisory
recommendations and conditions prior to action by the Wales Town: Board: prior to final
inspection and approval. The report shall be submitted to the Town. and an identical copy
maintained at an approved on-site location. . oe
9. Fire Safety Compliance Plan. Such plan. shall document
d and verify that the system and its
associated controls and safety systems are:in compliance with the Uniform Code. The Plan
should clearly indicate compliance with all provision of the NFPA, including methods and
means for the supply of adequate water for potential fire “suppression of the structure itself,
and non-battery materials needed by Wales First Responders and the Wales Fire
Company. Full compliance with the requirements, procedures, and documentation in
accordance with NYS Uniform: Fire NFPA 855 shall be included in the plan.
10. Operation and: Maintenance: Manual. ‘Such plan shail describe continuing battery energy
installation, testing and commissioning information and shall meet alll requirements set
forth in. the Uniform, Code.
11. Erosion and sediment control and storm water management plans prepared to New York State
Department of Environmental Conservation standards, ifapplicable, and to such standardsas may be
established by the Planning Board.
oe 42. “Prior to: the issuance of the building permit or final approval by the Wales Town Board, but not
SE required as part: of the application, engineering documents must be signed and sealed by aNYS
me Licensed Professional Engineer.
13. Emergency Operations Plan. A copy of the approved Emergency Operations Plan shail be
givento the system owner, the local fire department, and local fire code official. A permanent
copy shail also be placed in an approved location to be accessible to facility personnel, fire
code officials, and emergency responders. The emergency operations plan shall include the
following information:
(a) Procedures for safe shutdown, de-energizing, or isolation of equipment and systems
under emergency conditions to reduce the risk of fire, electric shock, and personal
injuries, and for safe start-up following cessation of emergency conditions.
TOWN OF WALES ~ BATTERY ENERGY STORAGE SYSTEMS VW
Page 12
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
(b) Procedures for inspection and testing of associated alarms, interlocks, and controls.
(c) Procedures to be followed in response to notifications from the Battery Energy Storage
Management System, when provided, that could signify potentially dangerous
conditions, including shutting down equipment, summoning service and repair
personnel, and providing agreed upon notification to fire department personnel for
potentially hazardous conditions in the event of a system failure.
(d) Emergency procedures to be followed in case of fire, explosion, release of liquids or
vapors, damage to critical moving parts, or other potentially dangerous conditions.
Procedures can include sounding the alarm, notifying the fire department, evacuating
personnel, de-energizing equipment, and controlling and extinguishing
the fire.
(e) Response considerations similar to a safety data sheet (SDS) that will address .
response safety concerns and extinguishment when an SDS is notrequired.
(f) Procedures for dealing with battery energy storage system equipment damaged in a fire
or other emergency event, including maintaining contact information for personnel
qualified to safely remove damaged battery energy y storage system equipment from the
facility.
(g) Other procedures as determined necessary) by the Town of Wales to provide for the
safety of occupants, neighboring properties, and emergency responders.
(h) Procedures and schedules for conducting drilts of these procedures and for training local
first responders on the contents of the plan and: appropriate response procedures.
1. Special Use Permit Standards.
1. Setbacks. Tier 2 Battery Energy Storage Systems are only permitted in Ag-Zoning districts
and shall have a front setback no less than 300’ from the edge of the road frontage Right
boundary lines. The rear “yard setback shall be no less than 100’ from the parcel’s rear
boundary line. For: all situations. the site. plan shall take into account neighboring dwellings
and/or commercial structures: which are considered by this Chapter as non-participating
entities. The ‘distance from the-applicant’s BESS structure(s) to the nearest non-
participating entity,on all nearby parcels shall always meet a structure-to-structure
distance of at least a 200 feet>
During. the Town of Wales’ s Site Plan review process, based upon unique project site
layouts, the Planning Board advisory recommendations, and the Town Board’s action(s)
may: require: additional setback distances for justifications related to the parcel geometry,
néarby neighbors, conflicting land use, nearby dwellings or structures, and other relevant
~ factors, including, but not limited to, noise criteria. In all cases the predicted and
- measured noise level at the parcel’s boundary lines shall meet the dB requirements of this
Chapter.
Height. Tier 2 Battery Energy Storage Systems shall comply with the building height
limitations for principal structures of the underlying Ag-Zoning district.
Fencing Requirements. Tier 2 Battery Energy Storage Systems, including all mechanical
equipment, shall be enclosed by a 7-foot-high security fence with a self-locking gate to
prevent unauthorized access, unless housed in a dedicated-use building with a structure
and design so as to not interfere with ventilation or exhaust ports required for safe
operations.
POWN OF WALES ~ BAS
Page 13
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
4. Screening and Visibility. Tier 2 Battery Energy Storage Systems shall have views minimized from
adjacent properties to the extent reasonably practicable using architectural features, earth
berms, landscaping, or other screening methods that will harmonize with the character of the
property and surrounding area and not interfering with the BESS infrastructure for ventilation
and cooling or heating exhaust ports.
5. AVisual Impact Assessment, prepared by a NYS Licensed Professional Engineer, shall be
supplied to indicate the impact of the BESS to adjacent parcels as well as from traffic and
pedestrian use of the roadway.
J. Ownership Changes:
if the owner of the battery energy storage system changes or the owner of the property. changes, the
special use permit shall remain in effect, provided that the successor owner or operator } assumes in
writing all of the obligations of the special use permit, site plan approval, and. decommissioning pian.
A new owner or operator of the battery energy storage system shall. notity the Wales Code Enforcement
owner or operator must provide such notification to the Code Enforcement Department and Wales
Town Clerk in writing. The special use permit and all other local approvals for the: battery energy
storage system would be void if a new owner or operator fails to provide 'written notification to the
Town of Wales in the required timeframe or manner. Reinstatement ofa void special use permit will
be subject to the same review and approval processes: for an initial new application under this Local
Law. = 2
Section 197-9: Safety Requirements
A. System Certification. Battery energy storage systems and equipment shall be listed by a
Nationally Recognized Testing Laboratory to UL 9540 (Standard for battery energy storage
systems and Equipment).or: “approved. equivalent, with subcomponents meeting each of the
following standards as applicable:
dp UL 1973 (Standard for: Batteries for Use in Stationary, Vehicle Auxiliary Power and
= Light Electric Rail Applications),
ie UL 1642 (Standard for Lithium Batteries),
: _. li, UL 1741 or UL 62109 (Inverters and Power Converters),
v. Certified under the applicable electrical, building, and fire
prevention codes as required.
v. Alternatively, field evaluation by an approved testing laboratory for
compliance with UL 9540 (or approved equivalent) and applicable
codes, regulations and safety standards may be used to meet
system certification requirements.
B. Site Access. Battery energy storage systems shall be maintained in good working order and in
accordance with industry standards. Site access shall be maintained, including snow removal at
a level acceptable to the Wales Fire Company and other First Responders. Additionally, for
Tier 2 Battery Energy Storage System site access shail be subject to the requirements of the
Town of Wales EMS Service as well as the County of Erie EMS crews located at the Wales
Fire Company site. Periodic inspections by the EMS forces shail be performed to confirm
compliance with their needs.
TOWN OF WALES ~ BATTERY ENERGY STORAGE SYSTEMS te 3
Page 14
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
C. Annual Special Use Permit Inspections. The Town of Wales, during the annual period of
Special Use Permit inspections, shall access the site and perform an annual site inspection to
confirm that all provisions of the applicable Special Use Permit are in compliance. The results
of the annual inspection will be reviewed and either approved or if non-compliance was
identified not-approved by the Wales Town Board. In the event of non-approval, based upon
inspection results or other factors, the Town will give the Applicant formal notice with a specific
timeframe defined for correction of any items of non-compliance with the Special Use Permit
provisions. A reinspection will be done after remedial action is taken and approved. Lack of
remedial action by the applicant shall be grounds for revocation of the Special Use Permit per
procedural mechanisms. oe
D. Battery energy storage systems, components, and associated ancillary equipment shall have
required working space clearances, and electrical circuitry shall be within weatherproof
enclosures marked with the environmental rating suitable for the type of exposure in compliance
with NFPA70 as currently in effect and as hereafter amended:from time to time. .
E. Hazardous Materials Management, Spill Prevention, and Containment
(a) Hazardous Materials Management Plan Required
The Applicant shall submit a Hazardous Materials Management.Plan prepared by a
qualified professional identifying all hazardous materials associated with the Battery
Energy Storage System (BESS) facility, including but not limited to batteries, electrolytes,
coolants, transformer oils, fire Suppression agents, and any ancillary hazardous
substances.
The Plan shall include: _ Sy, *
i. Identification and quantities of hazardous materials to be stored on-site;
ii, Safety Data, Sheets (SDs) for. applicable materials;
iii. Storage methods and containment measures;
iv. Spill prevention ’procedures:
v... Emergency notification procedures; and
vi. Procedures for handling, cleanup, transport, and disposal of contaminated
materials.
(b) Spil Prevention and Secondary Containment
“The BESS facility shall be designed, constructed, and operated to prevent the release of
»> hazardous materials to the environment.
“Where hazardous liquids are present, secondary containment shall be provided in
s ., accordance with applicable federal, state, and local requirements and shall be designed to
~ contain not less than one hundred ten percent (110%) of the volume of the largest
individual vessel or container, unless otherwise approved by the applicable regulatory
authority.
(c) Firefighting Water and Contaminated Runoff Management
The Applicant shall demonstrate measures to prevent contaminated runoff, fire
suppression water, battery electrolyte, or debris resulting from equipment failure, thermal
events, or emergency response activities from entering:
i. Surface waters;
TOWN OF WALES ~ BA’ ERGY STORAGE SYSTEMS
Page 15
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
ii, Wetlands;
ii. Stormwater conveyance systems;
iv. Groundwater; and
v. Adjacent properties.
Containment methods may include grading controls, berms, containment basins, shutoff
valves, isolation structures, or other equivalent engineering measures acceptable to the
Town. S
(d) Emergency Response Coordination
The Applicant shall provide documentation demonstrating coordination with the applicable
fire department and emergency responders regarding emergency Procedures addpessing
i. Thermal runaway events;
ii. Fire suppression;
iii. Hazardous materialreleases;
iv. Off-gassing events; and
v. Site access and emergency response protocols;
(e) Regulatory Compliance
The facility shall comply with all applicable federal, state, and local regulations governing
hazardous materials management, spill prevention, environmental protection, and
emergency response, including any applicable
Spill Prevention, Control, and
Countermeasure (SPCC) requirements.
(f) Decommissioning fo
The Decommissioning: Plan shall address removal, transport, recycling, disposal, and
lawful management of batteries, ‘electrolytes, contaminated materials, and any associated
hazardous substances. :
Section 197-1 0: Permit Time Frame and Abandonment
A “The Building Permit associated with the Special Use Permit and site plan approval for a
. “battery: energy. storage system shall be valid for a period of 24-months, provided that a building
Sh permit i is issued for construction and construction is commenced. In the event construction is
“not completed i in accordance with the final site plan and schedules, as may have been
amended and approved, as required by the Wales Town Board, within 24-months after
approval, the Town Board, at their discretion, may extend the time to complete construction for
up to 180-days. If the owner and/or operator fails to perform substantial construction after 36-
months, the approvals shail expire.
B. The battery energy storage system shall be considered abandoned when it is no longer capable
of the storage and delivery of energy to the grid for a period of 12 consecutive months. ifthe
owner and/or operator fails to comply with decommissioning upon any abandonment, the Town of
Wales may, at its discretion, enter the property and utilize the available bond and/or security for
the removal of a Tier 2 Battery Energy Storage System and the full restoration of the site in
TOWN OF WALES ~ BATTERY
Page 16
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
accordance with the decommissioning plan.
C. Conditions ina Wales BESS Special Use Permit shall include a provision which requires an
annual inspection by Town of Wales Officials during the Annual Scheduled SUP Inspection
Day. Advance notification of the inspection will be provided by the Town Clerk’s Office via
notice addressed to the designated official for the Tier 2 BESS Site.
ARTICLE Ill
FEES
Section 197-11. Fees
For a Tier 1 BESS, a non-refundable Town of Wales “Battery Energy Storage System (BESS). Permit’
application fee, and a Building Permit Fee shall be due for Tier 1 Battery Energy Storage System
developments. The fees shall be as determined by the Town of Wales's fee and:fines schedule, as
updated from time to time by the Town Board, with all fees paid by the Applicant. “The Code Enforcement
Department and/or the Town Clerk’s office should be consulted by the “Applicant tcto > ngpect the current
Fines and Fees schedule adopted by the Town Board. eee
For a Tier 2 BESS, a non-refundable application fee, a non-refundable Special Use Permit Fee, an
annual Special Use Permit Inspection fee, and a Building Permit:Feeé shall be:due for Battery Energy
Storage System developments. The fees shall be as determined by the Town of Wales’s fee schedule,
as updated from time to time by the Town Board, with all fees. paid: ‘by the Applicant. The Code
Enforcement Department and/or the Town Clerk’s office should be consulted by the Applicant to inspect
the current Fines and Fees schedule adopted by the Town Board. Due to the complexity and the
specialty skills involved in a Tier 2 BESS, it is presumed ‘that the: Town will employ certain professional
services during review of the applicant's-Special Use Permit and Building Permit submissions. Since
those Professional Engineering and Specialized Consultant activities cannot well defined in advance, the
recovery of costs for those services will be in:accordance with the Time and Materials municipal billing
rates of the engaged professional: It is.also anticipated that there may be disbursements or other direct
costs for the review of applicant submissions by these professionals. Both of these costs will be invoiced
to the applicant, and peimbursed to the Town by. the Applicant, within 60 days.
“ARTICLE iV
"ENFORCEMENT AND PENALTIES FOR OFFENSES
Section 197-12: Enforcement :
Any violation. of this Battery Energy Storage System (BESS) Law shall be subject to the same
enforcement requirements, including the civil and criminal penalties, provided for in the zoning or land
usé regulations of the Town of Wales, and/or if applicable, the relevant regulations of the County of
Erie or the State of New York.
ARTICLE V
SEVERABILITY AND EFFECTIVE DATE
Section 197-13: Severability and Effective Date
The invalidity or unenforceability of any section, subsection, paragraph, sentence, clause, provision, or
phrase of the aforementioned sections, as declared by the valid judgment of any court of competent
TOWN OF WALES ~ BATTERY ENERGY STORA
Page 17
Draft Wales Chapter #197 Battery Energy Storage Systems
Initial Draft (dated 10/26/26)
jurisdiction to be unconstitutional, shall not affect the validity or enforceability of any other section,
subsection, paragraph, sentence, clause, provision, or phrase, which shall remain in full force and
effect.
This Local Law shall take effect immediately upon filing with the Secretary of State of New York.
TOWN OF WALES ~ BATTERY ENERGY STORAGE SYSTEMS