SPR 2026-003
A request of Home Leasing, for site plan approval for a property located at 2544 Clinton
Street to permit a 3-story multi-unit residential building with all associated site work.
NEW BUSINESS
SPR 2026-007
A request from Benchmark Streamline LLC for property located at 325 Orchard Park Rd
for approval of a multi-building, mixed use, development and all associated site work.
ADJOURN
Page 1 of 1174
Page 2
West Seneca Community Center Planning Board Proceedings
1300 Union Rd Minutes#2026-07
West Seneca, NY 14224 July 9, 2026
Roll Call
Present:
• Mark Beeler, Planning Board Member
• Joe Sherman, Planning Board Member
• Margaret Bebak, Chairperson
• James Frick, Planning Board Member
• Eric Sailer, Planning Board Member
• Tim Hayes, Planning Board Member
• William Wise, Planning Board Member
Absent: None
Call To Order
The meeting was called to order By Margaret Bebak, seconded by James Frick @ 6:00 pm
Approval of Proofs of Publication
• Motion: A motion was made to approve the proof of publication.
• Recommendation: Approve
• Motion by: Margaret Bebak
• Seconded by: James Frick
• Ayes: All
• Noes: None
• Abstain: None
• Motion Carried
Approval of Meeting Minutes #2026-06
• Motion: A motion was made to approve the minutes from the previous meeting.
• Recommendation: Approve
• Motion by: Margaret Bebak
• Seconded by: Joseph Sherman
• Ayes: All
• Noes: None
• Abstain: None
• Motion Carried
Page 2 of 1174
Page 3
Old Businesses
SPR 2026-002: New Leaf, Inc for site plan approval for property located at 705
Orchard Park Road to permit an EV Parking Station and all associated site
work.
• Motion: A motion was made to table the request
• Recommendation: Table
• Motion by: Margaret Bebak
• Seconded by: Tim Hayes
• Ayes: All
• Noes: None
• Abstain: None
• Motion Carried
SPR 2026-003: Home Leasing, for site plan approval for a property located at
2544 Clinton Street to permit a 3-story multi-unit residential building with all
associated site work.
• Motion: A motion was made to table the request for site plan approval.
• Recommendation: Table
• Motion by: Margaret Bebak
• Seconded by: Tim Hayes
• Ayes: All
• Noes: None
• Abstain: None
• Motion Carried
SPR 2026-005: Zen Nails, for property located at 1976 Ridge Road to permit an
addition to the existing building and all associated site work.
• Mike Berger of Sutton Architecture represented the business. He explained that after
failing to secure an access agreement with the adjacent property owner, the plan was
revised. The new plan eliminates rear access and maintains the existing access points on
Ridge Road. A 6x4 dumpster in an 8x8 enclosure will be added on the side of the
property, accessible only from the Zen Nails property. Details for landscaping have been
provided as requested at the last meeting.
• Board Questions and Answers:
o Q (Tim Hayes): Asked for clarification on exiting to the rear, noting it seems
physically possible.
o A (Mike Berger): Acknowledged it's not physically obstructed but stated they do
not have a legal agreement with the property owner, so they are closing it off with
green space and landscaping to discourage unauthorized use.
o Q (William Wise): Asked if the closure would be a fence.
o A (Mike Berger): No, it will be a grass transition with landscaping elements.
Page 3 of 1174
Page 4
o Q (Joseph Sherman): Asked if the business will remain "appointment only."
o A (Mike Berger): Yes, that is the intent.
o Q (Tim Hayes): Asked about addressing minor engineering questions.
o A (Mike Berger): Confirmed they will address ADA compliance issues.
Sidewalks will be flush, and bumper stops will be added for cars. They plan to
maintain existing grade levels to avoid issues with the building's interior floor
levels.
• Public Comments: None.
• Motion: To approve the site plan and landscaping, subject to the conditions in the Town
of West Seneca Engineering Department letter dated July 9, 2026.
• Recommendation: Approve with conditions
• Motion by: Margaret Bebak
• Seconded by: James Frick
• Ayes: All
• Noes: None
• Abstain: None
• Motion Carried
SPR 2026-006: Carmina Wood Design, for site plan approval for property
located at 1425 Orchard Park Road to permit the development of fa multi-unit
town house development with all associated site work.
• Anthony Pandolfi of Carmina Wood Design, the project engineer, presented updates
since the last meeting. Additional parking has been added for the two southern six-unit
buildings. "No Parking" signs will be added in front of the units. Regarding school bus
service, he spoke with West Seneca Schools' transportation director. Students in grades 7-
12 will likely use the bus shelter at the front of the site, as their policy allows for a walk
of up to 0.3 miles. For K-6 students, who are only required to walk up to 0.1 miles, the
bus will need to enter the site to pick them up from the rear units. A turning plan was
provided to and approved by the school. Attempts to get a response from the school about
a walking path to the playground have been unsuccessful. The town engineer issued a
letter indicating comfort with the board issuing an approval contingent on resolving
minor final engineering comments.
• Board Questions and Answers:
o Q (Margaret Bebak): Confirmed there are 29 units, not 25.
o A (Anthony Pandolfi): Correct, 29 units.
o Q (Tim Hayes): Asked if the "minor" engineering comments regarding
stormwater analysis would require new data collection.
o A (Anthony Pandolfi): No, he believes it's a minor issue. The town wants them
to account for offsite drainage in the pond calculations, but since the land already
drains toward the wetlands, they can simply reroute it without needing treatment,
which shouldn't require major plan changes.
o Q (Eric Sailer): Asked if additional waiting areas for K-6 students will be
provided, since a bus will enter the site for them.
o A (Anthony Pandolfi): The plan shows one shelter by Orchard Park Road, but
there are sidewalks where students can congregate in the back.
Page 4 of 1174
Page 5
o Q (Eric Sailer): Inquired about the anticipated number of children, given they are
patio homes.
o A (Anthony Pandolfi): They are all two-bedroom units, and the target
demographic is seniors looking to downsize, so they do not anticipate a large
number of children.
• Public Comments: None.
• Motion: To approve the site plan, subject to the applicant's response to the requirements
in the engineering department letter dated July 9, 2026.
• Recommendation: Approve with conditions
• Motion by: Margaret Bebak
• Seconded by: Eric Sailer
• Ayes: All
• Noes: None
• Abstain: None
• Motion Carried
New Businesses
SPR 2026-004: Armstrong's Beer Company, for property located at 1340
Orchard Park Road for a special permit to allow the service of alcohol.
• Alex Armstrong, the owner, described his plan to create a family-friendly tap house
inspired by a brewery in Rehoboth Beach, DE. The goal is to provide a social space for
families. The establishment will have a tavern wine license to serve draft and canned
craft beer, ciders, and wine. The layout includes tables, couches, and a kids' area in the
back with a theater, Lego room, and small arcade. A simple food menu with items like a
burger and fries will be offered, with a focus on a kids' menu. Service will be handled at
the bar, not via table service.
• Board Questions and Answers:
o Q (Joseph Sherman): Asked if they will have a self-pour system like The Ridge.
o A (Alex Armstrong): No, bartenders will pour all drinks.
o Q (Eric Sailer): Asked about outdoor seating.
o A (Alex Armstrong): There is an outdoor area they have rights to use, but they
will address outdoor seating plans in the spring as they plan to open in the late fall
or winter.
o Q (Joseph Sherman): Asked if alcohol would be served in the outdoor area.
o A (Alex Armstrong): Yes.
o Q (Tim Hayes): Confirmed no hard liquor will be served.
o A (Alex Armstrong): Correct, just beer, wine, and cider. They do not anticipate
being a late-night destination.
o Q (Tim Hayes): Asked about hours of operation.
o A (Alex Armstrong): 11:00 AM to 9:00 PM.
o Q (Margaret Bebak): Asked for clarification on the "family basement" concept.
o A (Alex Armstrong): Confirmed the concept. They will have cameras in the kids'
area so parents can monitor them on their phones, and there will be chairs nearby
for parents who wish to watch their children directly.
Page 5 of 1174
Page 6
o Q (Joseph Sherman): Asked about supervision for the children's area.
o A (Alex Armstrong): Parents will be responsible for their own children.
o Q (Alex Armstrong / Self-Addressed): Addressed potential parking concerns,
noting the shared lot with Molly's Mutt (a drop-off location) and a Mexican
restaurant is large and rarely full. He noted an unused grass area owned by the
landlord could potentially be converted to parking if needed.
• Public Comments: None.
• Motion: To recommend to the Town Board that they issue the special permit.
• Recommendation: Recommend Approval
• Motion by: Margaret Bebak
• Seconded by: William Wise
• Ayes: All
• Noes: None
• Abstain: None
• Motion Carried
Adjourn
• Motion by: Margaret Bebak
• Seconded by: Mark Beehler
• The motion was second and all were in favor. Meeting adjourned 6:23pm
Page 6 of 1174
Page 7
April 20, 2026
Jeffery Schieber
Code Enforcement Officer
1250 Union Road – Room 210
West Seneca, New York 14224
RE: 2544 Clinton Street – Home Leasing Development
Site Plan Review Application Package
Mr. Schieber:
On behalf of Home Leasing Development, I am pleased to submit a Site Plan Review Application
Package for the proposed affordable multi-family housing project “West Seneca Apartments”,
located on one parcel at 2544 Clinton Street.
Home Leasing is seeking Site Plan Approval to develop the project on an approximately 12.7-acre
site. (TA#124.00-2-5). The project proposes the construction of 75-units spanning across two
buildings – the existing mansion on site (15-units) and a new 3-story multifamily apartment building
(60-units) with associated parking, site and drainage improvements.
The original project was approved by the Town Board for Rezoning, Special Use Permit and SEQR
Negative Declaration on 1/27/2025. The revised layout for the project was approved by the Town
Board for an Amendment to the existing Special Use Permit on 2/9/2026.
This package includes a fully engineered site package for Planning Board Review.
Per Town of West Seneca Code – Site Plan Review Criteria - “Planning Board Actions; project review
criteria” (Code Section 102-12 (A & B)), we offer the following responses:
(1) Conformance with this chapter and other adopted Town plans, an approved development
plan that includes the subject site, if one exists, and all other applicable laws;
To the best of our knowledge, the project is in compliance with all regulations of the R-50 zoning
district and supplemental multifamily housing requirements. Based on the 2016 Comprehensive
Plan – Neighborhoods – Section A, B and C – the plan supports continuing to build affordable
housing with West Seneca.
(2) Compatibility of the proposed development with the natural features of the land and the
environmental attributes of the site;
The project is designed to preserve and avoid disturbance in the environmentally sensitive areas
located on the site. There will be no disturbance within the archeological buffer area and 100-year
floodplain. All development is located in FEMA Zone X and areas of minimal flood hazard.
Development is located away from Cayuga creek to maintaining an existing natural buffer. The site
layout is designed to maintain existing trees/vegetation along Clinton Street and along the perimeter
of the parcel.
Page 7 of 1174
Page 8
(3) The project's compliance with grading and drainage requirements of the Town;
The project is designed to comply with the town standards. Stormwater is designed to meet NYS
Stormwater Design Manual standards, grading and disturbance will be limited to areas as required
for installation of stormwater practices and to achieve positive drainage away from buildings/across
hardscape areas.
(4) The project's compliance with the Town's Flood Damage Prevention Law;
The project is located partially within FEMA Zone X, with the majority of the development sitting
outside of all mapped zones. Per Town Code Section 77-12 – A floodplain development permit is not
required for development within Zone X.
(5) The general layout and design of buildings, lighting, signage, open space and development
features consistent with reasonable planning principles;
The proposed singular new 3-story building (60-units) along with utilizing the existing mansion for an
additional 15-units was chosen to lessen the overall footprint on the property. The existing
landscaping and stone wall are being preserved to the greatest extent possible, providing screening
of the new building and parking lot from Clinton Street. Roads and parking lots have been designed
to meet town standards and allow for proper emergency access.
(6) The location and design of vehicular entrances/exits, including emergency access and fire
lanes, in relation to the street system, traffic circulation and control within the site, and
coordination of access points and circulation with adjoining properties;
The existing entrance to the property is being utilized with minor widening to allow for adequate
space for emergency vehicles. The parking lot and roadways are designed to meet NYS Fire Code
including: fire lanes for aerial apparatus access along two sides of building, fire turnarounds, a
looped parking lot, and two new private fire hydrants.
(7) The provision and protection of pedestrian movement on the site and coordination of
pedestrian movement on adjoining properties and the street system;
Sidewalks are provided throughout the proposed development. All sidewalks (as shown on the plans)
are ADA compliant. Sidewalk access is provided out to Clinton Street and a new segment of sidewalk
within the ROW and extends to the west to the limits of the existing guardrail, in accordance with
previous coordination with NYSDOT.
(8) The location, design, layout and adequacy of parking, loading and stacking areas, including
the provision of opportunities for handicapped parking;
The parking lot provides the code required 170 spaces – including 20 visitor spaces. The submitted
plans proposes 20-banked parking spaces to be constructed in the future if demand requires it. ADA
and EV spaces are provided at both buildings, adjacent to the accessible entrances for the
respective buildings.
(9) Provision of landscaping, screening and buffers to complement development and protect
adjacent uses and public rights-of-way from unsightliness, noise, glare and other nuisances.
Such elements shall also be used to promote the availability of green space in nonresidential
development and recreation space in residential development to avoid a continuous paved
or built environment;
2
Page 8 of 1174
Page 9
The project layout was designed to preserve open space. Existing natural buffers will be maintained
along the north, east and west boundaries of the site. Trees along the south (Clinton Street) will be
maintained – other than removal required for the widening of the driveway. A patio area and
playground are provided, along with landscaped islands throughout the parking lot. Trees will be
added along the entrance drive to provide additional screening of the new development from Clinton
Street.
(10) Adequate provision of drainage and stormwater management facilities;
A Stormwater Pollution Prevention Plan (SWPPP) was prepared for the site and is included in this
submission package. The site is designed per the NYS Stormwater Design Manual standards and
NYSDEC Standards and Specifications for Erosion and Sediment Control. Several stormwater
practices are proposed for the site including bioretention areas, underground stormwater chambers
and use of a hydrodynamic separator (water quality unit).
(11) Adequacy of sewer and water facilities, fire protection and conformance with Town
regulations for the provision and construction of those services;
A full sewer report (including flow testing) has been completed. Findings of the monitoring was
reviewed and approved by Erie County Sewer, concluding that the sewer has sufficient capacity to
support the proposed project. Existing flow tests for the watermain on Clinton Street have been
reviewed and it was determined that the existing watermain has sufficient pressure to support the
proposed project. Both buildings will be designed to meet NYS Fire Code (for rehabilitation of the
existing building and new construction).
(12) Where appropriate and applicable, the concurrence of Town agencies, New York State
Department of Transportation, New York State Department of Environmental Conservation
and other county or state agencies, as appropriate; and
Correspondence with reviewing agencies will be/has been provided to the town as a part of the site
plan review. To date NYSDOT and SHPO correspondence was provided as part of SEQR review and
issuance of the Special Use Permit.
(13) Meeting the requirements for a site plan, as identified in this chapter.
This application package as submitted meets the requirements of the Town Code, to the best of our
knowledge.
Included for your consideration in the Site Plan Review are the following items:
• Site Plan Application
• Civil Plan Set
• Architectural Elevations & Rendering
• Preliminary ALTA
• Engineering Report
• SWPPP
• Check – Review Fee (mailed separately)
3
Page 9 of 1174
Page 10
We look forward to presenting this project to the Planning Board on May 14th, 2026. If you have any
questions or need any additional information, please feel free to contact me at 585-770-2525 or
[email protected].
Respectfully submitted,
LaBella Associates
Shelby Vakiener, Civil Engineer
4
Page 10 of 1174
Page 11
4/20/2026
West Seneca Apartments
2544 Clinton Street - Nearest cross street - Lakeside Court ( +/- 750 LF to the East)
Home Leasing - (contact - Angela Eicholtz) (248) 978-4420
45 East Avenue, 2nd Floor, Rochester, NY 14604
Clinton Street Realty Holdings
Labella Associates DPC - (contact - Shelby Vakiener) (585) 454-6110
300 Pearl Street, Suite 130, Buffalo, NY 14202
124.00-2-5
Construction of a new multifamily housing project with 75 total units. Includes a new +/- 75,900 SF building with 60 units and the re-purposing of the
existing mansion on site with 15 units. Also includes, driveway, parking, stormwater management facilities
12.7 (to creek CL) N/A
Clinton Street: +/- 205 LF of frontage
R-50 R-50
Commercial
Residential - Mutlifamily
Zoning: R75(S), R-100 A, R-100A(S), C-2, C-2(S)
Uses include: 1 Family Residential, 2 Family Residential, Residential vacant land, Residential w/ community use, warehouse, converted residential
X X
Special Use Permit - Issued by Town Board on 2/9/2026
Page 11 of 1174
Page 12
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
Page 12 of 1174
Page 13
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
Page 13 of 1174
Page 14
SV
FUTURE
FUTURE
SV
SV
SV
SV
SV
SV
SV
SV
SV
Shelby Vakiener - agent for applicant West Seneca Apartments
2544 Clinton Street
Page 14 of 1174
Page 15
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
SV
FUTURE
Page 15 of 1174
Page 16
SV
SV
SV
SV
n/a
SV
SV
SV
SV
n/a
n/a
SV
SV
SV
n/a
SV
Page 16 of 1174
Page 17
SV
SV
FUTURE
SV
Page 17 of 1174
Page 18
Page 18 of 1174
Page 19
ISSUED FOR SITE PLAN APPROVAL
WEST SENECA APARTMENTS
2544 CLINTON ST,
WEST SENECA, NY 14224
APRIL 2026
PROJECT LOCATION
PROJECT NO: 2241067
HOME LEASING
LOCATION MAP
N.T.S.
2544 CLINTON ST, WEST SENECA, NY 14224
HOME LEASING
75 S CLINTON AVE SUITE 700,
WEST SENECA APARTMENTS
ROCHESTER, NEW YORK 14604
PROJECT NO: 2241067
APRIL 2026
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
Page 19 of 1174
Page 20
NOT FOR CONSTRUCTION
GENERAL NOTES UTILITY NOTES LEGEND
1. THE CONTRACTOR ALONE SHALL BE RESPONSIBLE TO LOCATE UTILITIES OUTSIDE THE 1. CONTRACTOR SHALL COORDINATE INSTALLATION OF WATER MAIN / WATER SERVICE
RIGHT-OF-WAY INCLUDING PRIVATE ROADS. WITH ERIE COUNTY WATER AUTHORITY AND THE ERIE COUNTY HEALTH DEPARTMENT EXISTING PROPOSED DESCRIPTION EXISTING PROPOSED DESCRIPTION
(ECDOH). NO WORK SHALL BEGIN ON THE WATER MAIN / WATER SERVICE WITHOUT
2. SITE DRAINAGE, INCLUDING THE PROJECT SITE AND ADJACENT PRIVATE AND PUBLIC
ECWA AND ECDOH SIGNATURES ON THE UTILITY PLAN.
ROADWAYS, DRIVES, PARKING AREAS OR PROPERTIES SHALL BE MAINTAINED FLOODZONE END SECTION
300 Pearl Street, Suite 130
THROUGHOUT THE CONSTRUCTION PERIOD. 2. CONTRACTOR SHALL COORDINATE INSTALLATION OF SANITARY MAIN / SANITARY
SERVICE WITH ERIE COUNTY PURE WATERS (ECPW). NO WORK SHALL BEGIN ON THE ARCHAEOLOGICAL BUFFER CATCH BASIN Buffalo, NY 14202
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING ALL MATERIALS, TOOLS AND 716-551-6281
SANITARY MAIN / SANITARY SERVICE WITHOUT ECPW SIGNATURE ON THE UTILITY PLAN.
EQUIPMENT, INCLUDING SPECIAL CUTTING DEVICES, NECESSARY TO PERFORM THE TREE REMOVAL Y DRAIN BASIN
WORK CONTAINED IN THIS CONTRACT.
X X X X UTILITY REMOVAL C INLET MANHOLE
labellapc.com
4. THE SIZES AND MATERIAL OF CONSTRUCTION OF WATER MAINS, SANITARY SEWERS AND
STORM SEWERS TO REMAIN ARE REPUTED. THE CONTRACTOR SHALL VERIFY SIZES OF SAWCUT D D STORM MANHOLE
ALL UTILITIES WHERE CONNECTIONS TO SAID EXISTING UTILITIES ARE REQUIRED.
EXCAVATION TO VERIFY THESE UTILITIES SHALL BE MADE AT NO ADDITIONAL COST TO
GRADING NOTES TREE PROTECTION S SANITARY MANHOLE
THE OWNER.
1. THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS OF OSHA, AND ANY OTHER
AGENCY HAVING JURISDICTION WITH REGARD TO SAFETY PRECAUTIONS WITH CHAIN LINK FENCE S INLET DRYWELL
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING SITE AMENITIES NOT DESIGNATED FOR
REMOVAL. TRENCHING OPERATIONS. THE REQUIREMENTS SET FORTH HEREIN ARE INTENDED TO
BOARD-ON-BOARD FENCE C0
CLEAN OUT
SUPPLEMENT REQUIREMENTS ESTABLISHED BY THESE AGENCIES. IN THE CASE OF A
6. UNLESS OTHERWISE INDICATED ON THE PLANS OR DIRECTED BY THE CONFLICT BETWEEN REQUIREMENTS OF OTHER JURISDICTIONAL AGENCIES AND THESE
GUARD RAIL DS DOWN SPOUT
ARCHITECT/ENGINEER, THE CONTRACTOR IS RESPONSIBLE FOR PRESERVING AND DOCUMENTS, THE MORE STRINGENT REQUIREMENT ON THE CONTRACTOR SHALL APPLY.
PROTECTING FROM DAMAGE ALL TREES, SHRUBS AND PLANTS IN THE VICINITY OF THE
2. SHEETING, IF REQUIRED DURING CONSTRUCTION, IS CONSIDERED TO BE PART OF THIS TREE/VEGETATION LIMIT HYDRANT
PROPOSED WORK.
CONTRACT AND SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
7. THE CONTRACTOR SHALL PROTECT AND SUPPORT ALL EXISTING UTILITIES DESIGNATED BLDG BUILDING/STRUCTURE VALVE
TO REMAIN FOR THE DURATION OF THE CONTRACT. 3. ALL TRENCHES THROUGH PAVEMENT SHALL BE SAW CUT PRIOR TO EXCAVATION AND
AGAIN PRIOR TO PAVEMENT RESTORATION. PROPERTY LINE FLOW ARROW
8. ANY SITE AMENITY, UTILITY, STREET APPURTENANCE, OR OTHER ITEM WHICH BECOMES EXP: EXP:
DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR 4. CONTRACTOR SHALL ADJUST THE RIMS OF ALL MANHOLES, CATCH BASINS, VALVE EASEMENTS TELEPHONE LINE
REPLACED IN-KIND BY THE CONTRACTOR AS DETERMINED BY THE PROJECT MANAGER BOXES AND OTHER UTILITY SITE STRUCTURES TO MEET FINISHED GRADE IN AREAS
OR ARCHITECT/ENGINEER AND AT NO ADDITIONAL COST TO THE OWNER. REQUIRING REPAVING OR REGRADING AS PART OF THE WORK, INCLUDING THOSE THAT RIGHT-OF-WAY OVERHEAD ELECTRIC CERTIFICATE OF AUTHORIZATION NUMBER:
MAY NOT BE SHOWN ON THE PLANS. PROFESSIONAL ENGINEERING: 0021272
RETAINING WALL UE UE UNDERGROUND ELECTRIC LAND SURVEYING: 0021271
5. VOIDS LEFT BY UTILITY OR STRUCTURE REMOVAL OR GRUBBING OPERATIONS SHALL BE
GEOLOGICAL: 0021659
BACKFILLED AND PROPERLY COMPACTED WITH STRUCTURAL FILL (NYSDOT ITEM 304.12) BOLLARD GAS LINE
SURVEY NOTES IN AREAS UNDER AND WITHIN 5 FEET HORIZONTALLY OF ALL STRUCTURES, BUILDINGS
AND PAVEMENTS. IN GRASSED AREAS, VOIDS LEFT SHALL BE FILLED AND PROPERLY FLAG
FLAG POLE
POLE SA SANITARY LINE
COMPACTED WITH SUITABLE ON-SITE OR IMPORTED EARTHEN BACKFILL. ALL It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO
DISTURBED AREAS SHALL BE RESTORED. SIGN ST STORM LINE Sec. 7307, for any person, unless acting under the direction of a licensed
ALLOWANCE WILL BE MADE FOR ADDITIONAL COSTS DUE TO CONTRACTOR'S FAILURE TO
architect, professional engineer, or land surveyor, to alter an item in any
VERIFY EXISTING CONDITIONS. 6. THE CONTRACTOR SHALL DEWATER ALL EXCAVATIONS TO PREVENT THE INTRODUCTION DECIDUOUS TREE UD UD UD STORM UNDERDRAIN PIPE way. If an item bearing the seal of an architect, engineer, or land surveyor
OF GROUNDWATER INTO THE TRENCHES/EXCAVATIONS. PROVIDE ALL EQUIPMENT is altered; the altering architect, engineer, or land surveyor shall affix to
2. THE CONTRACTOR SHALL LOCATE, MARK, SAFEGUARD AND PRESERVE ALL SURVEY
NECESSARY TO MAINTAIN THE GROUNDWATER LEVEL AS NECESSARY. CONIFEROUS TREE the item their seal and notation "altered by" followed by their signature and
MARKERS AND RIGHT-OF-WAY MARKERS IN THE AREA OF CONSTRUCTION. FS WATER FIRE SERVICE LINE
7. THE CONTRACTOR SHALL PLACE AT MINIMUM 6 INCHES OF CLEANED SCREENED date of such alteration, and a specific description of the alteration.
3. ANY IRON PINS, MONUMENTS OR OTHER ITEMS DEFINING PROPERTY LINES WHICH ARE TREE STUMP W WATER LINE
TOPSOIL IN ALL DISTURBED AREAS PRIOR TO SEEDING.
DISTURBED BY CONSTRUCTION OPERATIONS SHALL BE PROPERLY TIED AND
ACCURATELY RESET BY A NYS LICENSED SURVEYOR UPON COMPLETION OF THE WORK. OUTLET PROTECTION 510 MAJOR CONTOUR © 2024
2026 LaBella Associates
4. HORIZONTAL DATUM BASED OFF NAD83. BIORETENTION 509 MINOR CONTOUR
5. VERTICAL BASED OFF OF NAVD88.
EROSION AND SEDIMENT CONTROL NOTES BOLLARD LIGHT POLE ℄ OF DRAINAGE SWALE
LIGHT POLE
1. ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH NEW YORK EROSION FENCE
DEMOLITION NOTES STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL, AND LOCAL
GOVERNING SOIL AND WATER CONSERVATION AGENCY RECOMMENDATIONS AND
SINGLE
LIGHT POLE DOUBLE FLOW/SLOPE DIRECTION
HOME LEASING
STANDARDS. CONTRACTOR SHALL SUBMIT PROPOSED EROSION CONTROL PLAN 75 S CLINTON AVE SUITE 700,
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. NO UTILITY POLE
INCLUDING SEQUENCING OF WORK TO THE ENGINEER FOR REVIEW PRIOR TO START OF SILT SOCK INLET PROTECTION ROCHESTER, NEW YORK 14604
ALLOWANCE WILL BE MADE FOR ADDITIONAL COSTS DUE TO CONTRACTOR'S FAILURE TO
WORK.
VERIFY EXISTING CONDITIONS AND DIMENSIONS. HH HANDHOLE SILT FENCE INLET PROTECTION
2. UTILIZE CONSTRUCTION METHODS/TECHNIQUES, WHICH WILL LIMIT THE EXPOSED
2. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY DIG SAFE
EARTHEN AREAS AND MINIMIZE THE EFFECT OF EARTH DISTURBANCE ACTIVITIES ON SOIL E MANHOLE CHECK DAM
NEW YORK AT 811 TO REQUEST UTILITY STAKEOUT OF ALL PUBLIC UTILITIES.
EROSION. THE AREA OF DISTURBANCE SHALL BE LIMITED TO A MAXIMUM OF 5 ACRES
3. WORK ASSOCIATED WITH THIS CONTRACT WILL OCCUR AT AN ACTIVE AND FUNCTIONAL UNLESS OTHERWISE APPROVED BY THE ENGINEER.
FACILITY. CONTRACTOR SHALL COORDINATE WITH THE OWNER TO MINIMIZE DISRUPTION
3. ALL SEDIMENTATION BARRIERS AND OTHER TEMPORARY OR PERMANENT MEASURES STABILIZED CONSTRUCTION ENTRANCE
TO THE OPERATIONS OF THE FACILITY. CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO
SHALL BE IN PLACE PRIOR TO THE START OF CONSTRUCTION. PLANS SHOW THE
PROVIDE A SAFE WORK SITE AND TO PROTECT THE PUBLIC, VISITORS AND EMPLOYEES
SUGGESTED MINIMUM MEASURES REQUIRED.
FROM HARM AS A RESULT OF HIS CONSTRUCTION ACTIVITIES.
4. REMOVAL OF ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES
4. THE HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING ABOVE GROUND AND
SHALL BE COMPLETED AT THE APPROVAL OF THE OWNER AND ENGINEER. THE COST OF
BELOW GROUND UTILITIES, STRUCTURES, AND APPURTENANCES SHOWN ON THE PLANS
REMOVING THESE MEASURES SHALL ALSO BE INCLUDED IN THE BID PRICE.
ARE APPROXIMATE AND ARE NOT GUARANTEED. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DETERMINING THE EXACT HORIZONTAL AND VERTICAL LOCATION OF 5. FOR THE DURATION OF THE PROJECT, THE CONTRACTOR SHALL PROTECT ALL ON-SITE,
ALL UTILITIES, STRUCTURES, AND APPURTENANCES IN THE PATH OF AND ADJACENT TO ADJACENT AND/OR DOWNSTREAM STORM/SANITARY SEWERS, AND/OR OTHER WATER
THE PROPOSED WORK. COURSES FROM CONTAMINATION BY WATER BORNE SILTS, SEDIMENTS, FUELS,
SOLVENTS, LUBRICANTS OR OTHER POLLUTANTS ORIGINATING FROM ANY WORK DONE
5. SITE DRAINAGE, INCLUDING THE PROJECT SITE AND ADJACENT PRIVATE AND PUBLIC
ON, OR IN SUPPORT OF THIS PROJECT.
ROADWAYS, DRIVES, PARKING AREAS OR PROPERTIES SHALL BE MAINTAINED
THROUGHOUT THE CONSTRUCTION PERIOD. 6. DURING CONSTRUCTION NO WET OR FRESH CONCRETE OR LEACHATE SHALL BE
ALLOWED TO ESCAPE INTO STORM/SANITARY SEWERS, DITCHES OR OTHER WATERS OF
6. CONTRACTOR SHALL PROTECT AND SUPPORT ALL EXISTING UTILITIES DESIGNATED TO
REMAIN FOR THE DURATION OF THE CONTRACT.
NEW YORK STATE, NOR SHALL WASHINGS FROM CONCRETE TRUCKS, MIXERS OR OTHER
DEVICES BE ALLOWED TO ENTER ANY STORM/SANITARY SEWERS, DITCHES, RIVERS, OR
DRAWING INDEX
7. THE CONTRACTOR SHALL NOTIFY THE LOCAL GOVERNMENT, LOCAL FIRE DEPARTMENT WATER COURSES.
AND THE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION (NYSDEC)
7. ALL EXCAVATED OR IMPORTED EARTHEN STOCKPILES SHALL BE SUITABLY STABILIZED
C001 GENERAL NOTES, LEGEND, AND DRAWING INDEX
AS NECESSARY AND SHALL OBTAIN ANY REQUIRED PERMITS PRIOR TO BEGINNING
WORK. COPIES OF ANY REQUIRED PERMITS SHALL BE PROVIDED TO THE OWNER PRIOR
AND PROTECTED BY SILT FENCE SO THAT IT CANNOT REASONABLY ENTER ANY WATER WEST SENECA APARTMENTS
BODY, OR STORM OR SANITARY SEWER.
TO BEGINNING THE WORK. C003 TOTAL LAND HOLDINGS 2544 CLINTON ST,
8. ALL METHODS AND EQUIPMENT PROPOSED BY THE CONTRACTOR TO ACCOMPLISH THE WEST SENECA, NY 14224
8. CONTRACTOR SHALL REMOVE FROM SITE, MATERIALS NOT INDICATED TO BE SALVAGED
WORK FOR EROSION AND POLLUTION CONTROL SHALL BE SUBJECT TO APPROVAL OF
INCLUDING ALL DEBRIS. ALL REMOVED MATERIALS SHALL BECOME THE PROPERTY OF
THE ENGINEER. C101 EXISTING CONDITIONS AND DEMOLITION PLAN
CONTRACTOR WHO SHALL LEGALLY DISPOSE OF SAME.
9. THE CONTRACTOR SHALL BE REQUIRED TO TREAT TRAVELED AREAS TO CONTROL DUST.
9. ALL TREES, SHRUBS AND PLANTS DESIGNATED TO REMAIN AND DISTURBED BY
CONSTRUCTION OPERATIONS, SHALL BE REPLACED IN-KIND AS DIRECTED BY THE
WATER SHALL BE APPLIED TO SUCH TRAVELED AREAS AS THE ARCHITECT/ENGINEER OR C102 EXISTING CONDITIONS AND DEMOLITION PLAN
OWNER'S DESIGNATED REPRESENTATIVE MAY DESIGNATE. THE NUMBER OF
ARCHITECT/ENGINEER AND/OR OWNER'S DESIGNATED REPRESENTATIVE AT NO
APPLICATIONS AND THE AMOUNT OF WATER SHALL BE BASED UPON FIELD AND
ADDITIONAL COST TO THE OWNER.
WEATHER CONDITIONS. C200 OVERALL SITE PLAN
10. THE CONTRACTOR SHALL MAINTAIN SAFE VEHICULAR AND PEDESTRIAN ACCESS TO THE
10. ALL AREAS OF SOIL DISTURBANCE RESULTING FROM THIS PROJECT WHICH WILL NOT BE
EXISTING BUILDINGS FOR THE DURATION OF THE CONTRACT.
SUBJECT TO FURTHER EARTHWORK OR CONSTRUCTION ACTIVITIES SHALL BE
11. WHEN EXISTING CONSTRUCTION WHICH IS TO REMAIN IS DAMAGED DURING THE PERMANENTLY SEEDED TO ESTABLISH GRASS, AND MULCHED WITH HAY OR STRAW C201 SITE PLAN
COURSE OF CONSTRUCTION AS A RESULT OF CONTRACTORS WORK, IT SHALL BE WITHIN ONE WEEK OF FINAL DISTURBANCE. MULCH SHALL BE MAINTAINED UNTIL A
REPAIRED AND/OR REPLACED WITH SIMILAR OR LIKE MATERIALS AS MUCH AS POSSIBLE, SUITABLE VEGETATIVE COVER IS ESTABLISHED. NO: DATE: DESCRIPTION:
AT NO COST TO THE OWNER. ALL REPAIRS AND/OR REPLACEMENTS WILL BE SUBJECT TO
C202 SITE PLAN
11. CONTRACTOR STAGING AREAS AND CONSTRUCTION ENTRANCE LOCATIONS SHALL BE Revisions
OWNERS APPROVAL.
COORDINATED WITH THE OWNER PRIOR TO START OF CONSTRUCTION. STABILIZED
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C001 GENERAL NOTES.dwg
12. COORDINATE LOCATION OF TEMPORARY CONSTRUCTION FENCE AND TEMPORARY STONE CONSTRUCTION ENTRANCE(S), AS SHOWN ON THE PLANS SHALL BE PROVIDED. ALL C203 FIRE TRUCK AND SITE EMERGENCY ACCESS PLAN
STAGING AREA WITH OWNER DISTURBED AREAS SHALL BE RESTORED. PROJECT NUMBER:
2241067
12. ALL CATCH BASINS/DRAINAGE INLETS SHALL HAVE STONED INLET PROTECTION AROUND C301 UTILITY PLAN
SITE NOTES THEM AND GEOTEXTILE FABRIC OVER THE GRATE TO PREVENT SEDIMENTATION FROM
ENTERING THE STORM SYSTEM.
DRAWN BY:
EMM / SCB
1. WELL COMPACTED SUBGRADE SHALL BE UTILIZED UNDERNEATH CONSTRUCTION OF 13. TILL ALL COMPACTED SOILS LOCATED IN LAWN AREAS TO RESTORE THE ORIGINAL C302 UTILITY PLAN REVIEWED BY:
PAVEMENT AND CONCRETE BASES. PROPERTIES OF THE SOIL PRIOR TO SEEDING. SRV / DPB
2. ALL STAKEOUT FOR THE PROPOSED SITE IMPROVEMENTS SHALL BE COMPLETED BY A
C401 GRADING, EROSION, AND SEDIMENT CONTROL PLAN ISSUED FOR:
NEW YORK STATE LICENSED LAND SURVEYOR. SITE PLAN APPROVAL
3. IF ANY DISCREPANCIES ARE NOTED BETWEEN THESE CONSTRUCTION DOCUMENTS AND
INFORMATION PROVIDED OR AN ERROR IS SUSPECT, IT SHALL BE IMMEDIATELY C402 GRADING, EROSION, AND SEDIMENT CONTROL PLAN DATE:
REPORTED TO THE CONSTRUCTION MANAGER AND LABELLA ASSOCIATES PROJECT 4/20/2026
MANAGER IN WRITING.
C501 CONSTRUCTION DETAILS DRAWING NAME:
4. ANY PROOF-ROLLING OF EXPOSED SUBBASE BY A MINIMUM 10 TON SMOOTH DRUM
ROLLER SHALL BE DONE UNDER THE GUIDANCE OF, AND OBSERVED BY, QUALIFIED
ENGINEERING PERSONNEL PRIOR TO PLACEMENT OF SUBBASE MATERIAL. THE ROLLER C502 CONSTRUCTION DETAILS
SHOULD BE OPERATED IN THE STATIC MODE AND COMPLETE AT LEAST TWO (2) PASSES
OVER THE EXPOSED SUBGRADES.
5. EXISTING WETLANDS DELINEATED BY XXXX ON XX/XX/XXXX.
C503 CONSTRUCTION DETAILS GENERAL NOTES, LEGEND,
6. PARCEL LINES AS SHOWN BY XXXX COUNTY GIS DATABASE, FOR THE TOWN OF XXXX.
C504 CONSTRUCTION DETAILS AND DRAWING INDEX
C505 CONSTRUCTION DETAILS
C506 CONSTRUCTION DETAILS
DRAWING NUMBER:
C507 CONSTRUCTION DETAILS
4/20/2026 1:17:05 PM
C508 CONSTRUCTION DETAILS
L501 LANDSCAPE DETAILS
C001
Page 20 of 1174
Page 21
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
C0
D
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SEE SHEETS:
© 2024
2026 LaBella Associates
C101
C201
HOME LEASING
C301 75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
C401
PROPOSED
3-STORY C0
BUILDING C0
± 25,000 SF FOOTPRINT
C0
C0
C0
S
C0
D D
C0 D D
SEE SHEETS:
C0
DS
C102 WEST SENECA APARTMENTS
C202 2544 CLINTON ST,
WEST SENECA, NY 14224
DS
C302
C0
C402
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C003 OVERALL SITE PLAN.dwg
D
15.7'
NO: DATE: DESCRIPTION:
Revisions
C0
PROJECT NUMBER:
2241067
D
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
TOTAL LAND HOLDINGS
N
1 TOTAL LAND HOLDINGS 0' 60' 120' 180'
C003 SCALE: 1" = 60'
DRAWING NUMBER:
4/20/2026 1:17:07 PM
C003
Page 21 of 1174
Page 22
DEMOLITION KEY NOTES
NOT FOR CONSTRUCTION
1 REMOVE AND DISPOSE OF ASPHALT PAVEMENT SECTION, FULL DEPTH
REMOVE AND DISPOSE OF BUILDING, STRUCTURES, AND FOUNDATIONS
2 (REFER TO ARCHITECTURAL DRAWINGS AND SOIL MANAGEMENT PLAN
(SMP) FOR WORK WITHIN ARCHAEOLOGICAL BUFFER AREA)
3 REMOVE AND DISPOSE OF CONCRETE SIDEWALK SECTION, FULL DEPTH 300 Pearl Street, Suite 130
Buffalo, NY 14202
4 FULL DEPTH SAWCUT
716-551-6281
5 REMOVE AND DISPOSE OF TREE AND STUMP labellapc.com
6 REMOVE AND DISPOSE OF STUMP 15
REMOVE EXISTING UNDERGROUND UTILITY. EXACT EXTENTS OF UTILITY
7 X X
REMOVAL TO BE DETERMINED IN FIELD.
8 REMOVE EXISTING UTILITY STRUCTURE
9 REMOVE AND DISPOSE OF MOUNTED BUILDING LIGHTS(TYP.)
2
10 REMOVE AND DISPOSE OF MAILBOX
REMOVE AND PROTECT PORTION OF EXISTING STONE WALL FOR
11
REINSTALLATION
12 REMOVE AND DISPOSE OF GATE EXP: EXP:
13 PROTECT EXISTING TREE
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
14 PROTECT EXISTING UTILITY
LAND SURVEYING: 0021271
PROTECT EXISTING FENCE. FENCE TO BE EVALUATED BY OWNER. SECTIONS GEOLOGICAL: 0021659
15
TO BE REPLACED AS DETERMINED BY OWNER.
16 REMOVE AND DISPOSE OF EXISTING FLAG POLE AND FOUNDATION It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
17 REMOVE AND DISPOSE OF EXISTING SIGN architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
18 REMOVE AND DISPOSE OF EXISTING HVAC UNITS
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
19 PROTECT EXISTING STONE WALL
© 2024
2026 LaBella Associates
DEMOLITION PLAN NOTE:
1. ALL STUMPS AND BRUSH MAY NOT BE BURIED IN THE TOWN AND TOPSOIL MAY NOT
BE REMOVED FROM THE WORK SITE WITHOUT A PERMIT.
6
2
HOME LEASING
15
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
X
1
X
X
X
X
X
7
X
X
X
X
X
X
X
X
7
X
X
5
X
X
X
X
X
WEST SENECA APARTMENTS
X
X
X
2544 CLINTON ST,
X
X
8
WEST SENECA, NY 14224
X
X
2
X
5
3
15
1 NO: DATE: DESCRIPTION:
Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C100 DEMO PLAN.dwg
PROJECT NUMBER:
2241067
15 DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
1
DRAWING NAME:
EXISTING CONDITIONS AND
DEMOLITION PLAN
MATCH TO SHEET: C102
6
17
DRAWING NUMBER:
4/20/2026 1:17:39 PM
N
1 EXISTING CONDITIONS AND DEMOLITION PLAN 0' 20' 40' 60'
C101 SCALE: 1" = 20'
C101
Page 22 of 1174
Page 23
NOT FOR CONSTRUCTION
MATCH TO SHEET: C101
6
300 Pearl Street, Suite 130
17 Buffalo, NY 14202
716-551-6281
labellapc.com
6
DS
3
15
5
1
3
3
18
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
DS PROFESSIONAL ENGINEERING: 0021272
9
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
9 way. If an item bearing the seal of an architect, engineer, or land surveyor
3 7
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
X
10
3
X
© 2024
2026 LaBella Associates
X
X
X
X
X
HOME LEASING
T
X
1
75 S CLINTON AVE SUITE 700,
X
X
ROCHESTER, NEW YORK 14604
X
X
X
X
X
X 7
X
X
X
X
X
T
X
X
X
X
X
X
X
X
8
T
9
FLAG
POLE 15
15
WEST SENECA APARTMENTS
T
2544 CLINTON ST,
WEST SENECA, NY 14224
DEMOLITION KEY NOTES
T
1 REMOVE AND DISPOSE OF ASPHALT PAVEMENT SECTION, FULL DEPTH
REMOVE AND DISPOSE OF BUILDING, STRUCTURES, AND FOUNDATIONS
2 (REFER TO ARCHITECTURAL DRAWINGS AND SOIL MANAGEMENT PLAN
(SMP) FOR WORK WITHIN ARCHAEOLOGICAL BUFFER AREA)
3 REMOVE AND DISPOSE OF CONCRETE SIDEWALK SECTION, FULL DEPTH
4 FULL DEPTH SAWCUT 11 12
T
11 NO: DATE: DESCRIPTION:
Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C100 DEMO PLAN.dwg
5 REMOVE AND DISPOSE OF TREE AND STUMP
11 19 14
19 11
6 REMOVE AND DISPOSE OF STUMP PROJECT NUMBER:
REMOVE EXISTING UNDERGROUND UTILITY. EXACT EXTENTS OF UTILITY
2241067
14 ±18'
7 X X
REMOVAL TO BE DETERMINED IN FIELD. ±21'
19 DRAWN BY:
8 REMOVE EXISTING UTILITY STRUCTURE EMM / SCB
19
REVIEWED BY:
SRV / DPB
9 REMOVE AND DISPOSE OF MOUNTED BUILDING LIGHTS(TYP.) ±85'
4 ISSUED FOR:
10 REMOVE AND DISPOSE OF MAILBOX SITE PLAN APPROVAL
REMOVE AND PROTECT PORTION OF EXISTING STONE WALL FOR DATE:
11
REINSTALLATION 4/20/2026
12 REMOVE AND DISPOSE OF GATE DRAWING NAME:
13 PROTECT EXISTING TREE
14 PROTECT EXISTING UTILITY
15
PROTECT EXISTING FENCE. FENCE TO BE EVALUATED BY OWNER. SECTIONS
TO BE REPLACED AS DETERMINED BY OWNER.
EXISTING CONDITIONS AND
16 REMOVE AND DISPOSE OF EXISTING FLAG POLE AND FOUNDATION DEMOLITION PLAN
17 REMOVE AND DISPOSE OF EXISTING SIGN
18 REMOVE AND DISPOSE OF EXISTING HVAC UNITS
DRAWING NUMBER:
19 PROTECT EXISTING STONE WALL
DEMOLITION PLAN NOTE:
4/20/2026 1:17:13 PM
1. ALL STUMPS AND BRUSH MAY NOT BE BURIED IN THE TOWN AND TOPSOIL MAY NOT N
BE REMOVED FROM THE WORK SITE WITHOUT A PERMIT.
1 EXISTING CONDITIONS AND DEMOLITION PLAN 0' 20' 40' 60'
C102 SCALE: 1" = 20'
C102
Page 23 of 1174
Page 24
NOT FOR CONSTRUCTION
C201
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
C0
D
labellapc.com
±103'
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
PROPOSED architect, professional engineer, or land surveyor, to alter an item in any
3-STORY C0
way. If an item bearing the seal of an architect, engineer, or land surveyor
BUILDING is altered; the altering architect, engineer, or land surveyor shall affix to
C0
the item their seal and notation "altered by" followed by their signature and
± 25,000 SF FOOTPRINT date of such alteration, and a specific description of the alteration.
±103'
C0
© 2024
2026 LaBella Associates
C0
C0
S
C0
HOME LEASING
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
D D
C0 D D
C202 C0
DS
±445'
DS
25-FT SIDE SETBACK
WEST SENECA APARTMENTS
C0
2544 CLINTON ST,
WEST SENECA, NY 14224
PROJECT DATA
PARCEL INFORMATION
APPLICANT HOME LEASING
PARCEL ADDRESS 2544 CLINTON STREET
SLB # 124.00-2-5
D PARCEL AREA (TOTAL) 12.7 ACRES
15.7'
TOTAL PROJECT AREA ±7.0 ACRES
EXISTING IMPERVIOUS NO: DATE: DESCRIPTION:
1.06 ACRES
WITHIN PROJECT AREA Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C200 SITE PLAN.dwg
C0
PROPOSED IMPERVIOUS
2.98 ACRES
WITHIN PROJECT AREA
PROJECT NUMBER:
TOTAL DISTURBANCE AREA ±5.7 ACRES
2241067
ZONING INFORMATION
DRAWN BY:
REQUIRED PROPOSED EMM / SCB
D CLASSIFICATION R-50 R-50 REVIEWED BY:
SRV / DPB
FRONT SETBACK 30 FT ±445 FT
ISSUED FOR:
30-FT FRONT SETBACK SIDE SETBACK 25-FT* ±103 FT
SITE PLAN APPROVAL
REAR SETBACK 40-FT** ±255 FT
DATE:
OPEN SPACE - 8.5 ACRES
4/20/2026
MAX BUILDING HEIGHT 40 FT ±37 FT
DRAWING NAME:
TOTAL APARTMENT UNITS 75
PARKING INFORMATION
REQUIRED PROPOSED
170 (INCLUDING 20
PARKING SPACES 170
BANKED SPACES)
*OR A DISTANCE EQUAL TO THE HEIGHT OF PRINCIPAL BUILDING, WHICHEVER IS
OVERALL SITE PLAN
GREATER.
**FOR MULTIFAMILY DWELLINGS, EACH SIDE YARD SHALL BE 25 FEET OR A
DISTANCE EQUAL TO ONE-HALF (1/2) THE HEIGHT OF SUCH BUILDING, WHICHEVER
IS GREATER. THE TOTAL OF THE TWO SIDE YARDS SHALL BE TWICE THAT REQUIRED
FOR ONE SIDE YARD. THE TOWN BOARD SHALL HAVE THE POWER TO REDUCE SAID
SIDE YARD REQUIREMENTS UPON SHOWING OF SPECIAL CIRCUMSTANCES OR
HARDSHIP.
***MULTIFAMILY DEVELOPMENTS REQUIRE VISITOR PARKING. BASED ON UNIT DRAWING NUMBER:
COUNT (74), 20 VISITOR SPACES ARE REQUIRED FOR THIS COMMUNITY.
4/20/2026 1:17:19 PM
N
1 OVERALL SITE PLAN 0' 40' 80' 120'
C200 SCALE: 1" = 40'
C200
Page 24 of 1174
Page 25
NOT FOR CONSTRUCTION
SITE KEY NOTES
SIGN SUMMARY
1 NEW STANDARD DUTY ASPHALT PAVEMENT NUMBER NAME IMAGE SIZE MUTCD NUMBER QUANTITY
COLORS
NEW YORK STATE
2 NEW CONCRETE SIDEWALK BLACK LETTERING ON
1b 'HANDICAP' 12" x 18" SYMBOL 6
WHITE BACKGROUND
S:\MFriedle\blueicon.jpg
3 NEW CONCRETE DUMPSTER PAD, SEE DETAIL STANDARD 30' 300 Pearl Street, Suite 130
20'
NO PARKING NO
PARKING RED LETTERING ON Buffalo, NY 14202
4 NEW CONCRETE PAD FOR TRASH COLLECTION 2b ANY 12" x 18" R7-1 3 716-551-6281
SIGN TIME WHITE BACKGROUND
5 NEW CONCRETE GENERATOR/TRANSFORMER PAD, SEE DETAIL labellapc.com
RED SIGN WITH WHITE 29 R2
6 NEW PATIO AREA 3 STOP SIGN 30" x 30" R1-1 4 8'
LETTERING
C0
D
7 NEW CONCRETE CURB
ELECTRIC BLACK LETTERING ON 66'
8 NEW FLUSH CONCRETE CURB
4 EV PARKING VEHICLE 12" x 18" 8
PARKING
ONLY WHILE
CHARGING
WHITE BACKGROUND
9 NEW CURB TRANSITION 31
24'
10a NEW TYPE A CONCRETE ACCESS RAMP
10b NEW TYPE B CONCRETE ACCESS RAMP 4
8'
5'
EXP: EXP:
R2
10c NEW TYPE C CONCRETE ACCESS RAMP
14'
26'
10d NEW TYPE D CONCRETE ACCESS RAMP 30
CERTIFICATE OF AUTHORIZATION NUMBER:
2
25 28 PROFESSIONAL ENGINEERING: 0021272
11 NEW DETECTABLE WARNING SYSTEM 9 LAND SURVEYING: 0021271
7
GEOLOGICAL: 0021659
12 NEW PLAYGROUND AREA, WITH POURED IN PLACE PLAY SURFACING
20
13 NEW 4-FT CHAIN LINK FENCE (CLF) 9 25 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
12
architect, professional engineer, or land surveyor, to alter an item in any
14 NEW YELLOW PAVEMENT MARKINGS (TYP.)
13 way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
15 NEW CROSSWALK the item their seal and notation "altered by" followed by their signature and
14 date of such alteration, and a specific description of the alteration.
16 NEW ADA PARKING SYMBOL (TYP.)
© 2024
2026 LaBella Associates
17 NEW ADA PARKING STRIPING (TYP.)
20
18 NEW DUAL EV CHARGING UNIT (TYP.)
2 5
19 NEW EV PARKING SYMBOL AND SIGNAGE (TYP.)
20 NEW 4-FT CLF SWING GATE
HOME LEASING
28 75 S CLINTON AVE SUITE 700,
21
BANKED PARKING - FUTURE PAVED PARKING (TO BE CONSTRUCTED ROCHESTER, NEW YORK 14604
IF DEMAND INCREASES) 7
18'
22 RECONSTRUCT STONE WALL WITH SALVAGED MATERIALS 7
28.5'
23 NEW DETECTABLE WARNING SYSTEM
1
24 NEW STOP BAR
18' TYP. 30' 18' TYP.
25 NEW LIGHT POLE (TYP.) SEE UTILITY PLAN
26 NEW 6-FT BOARD-ON-BOARD FENCING 19
4
27 NEW 3-FT BOARD-ON-BOARD MANDOOR
28 LANDSCAPED AREA
PROPOSED 4
29
STORMWATER MANAGEMENT PRACTICE - REFER TO 300 SERIES
SHEETS FOR UTILITY DESIGN
3-STORY C0
9' TYP.
4
30 NEW SHED BUILDING 4 C0
31 NEW SNOW STORAGE AREA ± 25,000 SF FOOTPRINT 6' 7
4
WEST SENECA APARTMENTS
28 28
4 2544 CLINTON ST,
1b 2b 1b 1b 2b 1b
9 WEST SENECA, NY 14224
18
25
C0
10c 10c 10c 28
31
6'
C0
2
9 9 28
18' TYP.
7 9' TYP. 7
28 10a
C0 11
S
R2
C0
7
8'
7 9
16 17 16 17
NO: DATE: DESCRIPTION:
15 Revisions
30'
14
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C200 SITE PLAN.dwg
24
R4
0' PROJECT NUMBER:
7 9 3
7 2241067
R1
5 '
R1
5' 7 7
29 DRAWN BY:
EMM / SCB
18' TYP.
28 REVIEWED BY:
28 D
28
D
28 SRV / DPB
30' 30'
10b ISSUED FOR:
5' 21 SITE PLAN APPROVAL
18' TYP.
25 25 25 25
DATE:
4/20/2026
5'
7
R1
R1
DRAWING NAME:
5'
C0 D D
9
1 15
30'
14
24
3 17 16
21'
9
10b 3 SITE PLAN
9
MATCH TO SHEET: C202
8'
R2
18' TYP.
29'
8 9 7 7 7
26 9 28 28
19 10c 10c 2
27 10c
6'
28 DRAWING NUMBER:
C0
5'
4/20/2026 1:17:52 PM
N
1 SITE PLAN 0' 20' 40' 60'
C201 SCALE: 1" = 20'
C201
Page 25 of 1174
Page 26
NOT FOR CONSTRUCTION
3 17 16 9
10b 3
9 21'
MATCH TO SHEET: C201
8'
R2
18' TYP.
29'
8 9 7 7 7
26 9 28 28 300 Pearl Street, Suite 130
19 10c 10c 2
27 10c
Buffalo, NY 14202
6'
28 716-551-6281
C0
5'
18 9 labellapc.com
4 4 1b 2b 1b 25
DS
5'
21
EXP: EXP:
2
CERTIFICATE OF AUTHORIZATION NUMBER:
DS 2 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
5'
25
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
SITE KEY NOTES Sec. 7307, for any person, unless acting under the direction of a licensed
C0 architect, professional engineer, or land surveyor, to alter an item in any
1 NEW STANDARD DUTY ASPHALT PAVEMENT R8 way. If an item bearing the seal of an architect, engineer, or land surveyor
5' 5' is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
2 NEW CONCRETE SIDEWALK
date of such alteration, and a specific description of the alteration.
29
3 NEW CONCRETE DUMPSTER PAD, SEE DETAIL
25 © 2024
2026 LaBella Associates
4 NEW CONCRETE PAD FOR TRASH COLLECTION
25 2
5 NEW CONCRETE GENERATOR/TRANSFORMER PAD, SEE DETAIL
6'
6 NEW PATIO AREA
7 HOME LEASING
18' TYP.
9' TYP. 10d
7 NEW CONCRETE CURB 10' 75 S CLINTON AVE SUITE 700,
5 9
ROCHESTER, NEW YORK 14604
8 NEW FLUSH CONCRETE CURB
10'
2 14
9
9 NEW CURB TRANSITION 9' 14 11
14
24'
D
10a NEW TYPE A CONCRETE ACCESS RAMP 24
31 3 15
10b NEW TYPE B CONCRETE ACCESS RAMP
10c NEW TYPE C CONCRETE ACCESS RAMP 11 1
25
29
10d NEW TYPE D CONCRETE ACCESS RAMP
R8
5'
10d
C0
11 NEW DETECTABLE WARNING SYSTEM
12 NEW PLAYGROUND AREA, WITH POURED IN PLACE PLAY SURFACING 9
13 NEW 4-FT CHAIN LINK FENCE (CLF)
25
14 NEW YELLOW PAVEMENT MARKINGS (TYP.)
15 NEW CROSSWALK
7
WEST SENECA APARTMENTS
16 NEW ADA PARKING SYMBOL (TYP.)
2544 CLINTON ST,
NEW ADA PARKING STRIPING (TYP.) 14 WEST SENECA, NY 14224
17
D
5' 30'
18 NEW DUAL EV CHARGING UNIT (TYP.)
19 NEW EV PARKING SYMBOL AND SIGNAGE (TYP.)
2
20 NEW 4-FT CLF SWING GATE
25
BANKED PARKING - FUTURE PAVED PARKING (TO BE CONSTRUCTED
21
IF DEMAND INCREASES)
9
22 RECONSTRUCT STONE WALL WITH SALVAGED MATERIALS 22
22 NO: DATE: DESCRIPTION:
23 NEW DETECTABLE WARNING SYSTEM Revisions
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C200 SITE PLAN.dwg
7 22
24 NEW STOP BAR 22 3 PROJECT NUMBER:
2241067
25 NEW LIGHT POLE (TYP.) SEE UTILITY PLAN 8' 9
R28 R2
' DRAWN BY:
26 NEW 6-FT BOARD-ON-BOARD FENCING 24 EMM / SCB
REVIEWED BY:
27 NEW 3-FT BOARD-ON-BOARD MANDOOR 7 SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
2' 5'
28 LANDSCAPED AREA 10b
STORMWATER MANAGEMENT PRACTICE - REFER TO 300 SERIES DATE:
29
SHEETS FOR UTILITY DESIGN 4/20/2026
30 NEW SHED 9 DRAWING NAME:
31 NEW SNOW STORAGE AREA
SIGN SUMMARY
NUMBER NAME IMAGE SIZE COLORS MUTCD NUMBER QUANTITY
NEW YORK STATE
SITE PLAN
BLACK LETTERING ON
1b 'HANDICAP' 12" x 18" SYMBOL 6
WHITE BACKGROUND
S:\MFriedle\blueicon.jpg
STANDARD
NO
NO PARKING PARKING RED LETTERING ON
2b ANY 12" x 18" R7-1 3
SIGN TIME WHITE BACKGROUND
DRAWING NUMBER:
RED SIGN WITH WHITE
3 STOP SIGN 30" x 30" R1-1 4
LETTERING
4/20/2026 1:18:01 PM
N
1 SITE PLAN 0' 20' 40' 60'
C202
ELECTRIC BLACK LETTERING ON
4 EV PARKING VEHICLE 12" x 18" 8 C202
PARKING
ONLY WHILE
CHARGING
WHITE BACKGROUND SCALE: 1" = 20'
Page 26 of 1174
Page 27
NOT FOR CONSTRUCTION
WEST SENECA FIRE DEPARTMENT LADDER
TRUCK EQUIVALENT VEHICLE PATH 300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
14'
PROPOSED
HYDRANT
EXP: EXP:
HYDRANT COVERAGE
(600-LF MAX)
HYDRANT COVERAGE CERTIFICATE OF AUTHORIZATION NUMBER:
(600-LF MAX) PROFESSIONAL ENGINEERING: 0021272
28' LAND SURVEYING: 0021271
397' GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
PROPOSED architect, professional engineer, or land surveyor, to alter an item in any
3-STORY way. If an item bearing the seal of an architect, engineer, or land surveyor
HYDRANT COVERAGE BUILDING is altered; the altering architect, engineer, or land surveyor shall affix to
(600-LF MAX) the item their seal and notation "altered by" followed by their signature and
± 25,000 SF FOOTPRINT date of such alteration, and a specific description of the alteration.
ACCESSIBLE
ROUTE (TYP.)
© 2024
2026 LaBella Associates
28'
28'
396'
S
RIM=600.15 533'
HOME LEASING
75 S CLINTON AVE SUITE 700,
ACCESSIBLE
WEST SENECA FIRE DEPARTMENT LADDER ROUTE (TYP.)
ROCHESTER, NEW YORK 14604
TRUCK EQUIVALENT VEHICLE PATH
WEST SENECA FIRE DEPARTMENT LADDER
TRUCK EQUIVALENT VEHICLE PATH
HYDRANT COVERAGE
(600-LF MAX)
PROPOSED
HYDRANT
ACCESSIBLE
ROUTE (TYP.)
DS
HYDRANT COVERAGE ACCESSIBLE
(600-LF MAX) ROUTE (TYP.)
276'
276' DS
WEST SENECA APARTMENTS
2544 CLINTON ST,
HYDRANT COVERAGE
(600-LF MAX)
WEST SENECA, NY 14224
15.7'
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C203 CODE COMPLIANCE.dwg
NO: DATE: DESCRIPTION:
WEST SENECA FIRE DEPARTMENT LADDER Revisions
TRUCK EQUIVALENT VEHICLE PATH
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
E-ONE HP95 Mid Mount
47.75
FIRE TRUCK AND SITE
EMERGENCY ACCESS PLAN
7.917 18.417 4.833
20.833
E-ONE HP95 Mid Mount
Overall Length 47.750ft
Overall Width 8.333ft
Overall Body Height 11.000ft
Min Body Ground Clearance 1.393ft
Track Width 8.333ft DRAWING NUMBER:
Lock-to-lock time 6.00s
Max Wheel Angle 45.00°
4/20/2026 1:17:33 PM
N
1 FIRE TRUCK AND SITE EMERGENCY ACCESS PLAN 0' 40' 80' 120'
C203 SCALE: 1" = 40'
C203
Page 27 of 1174
Page 28
NOT FOR CONSTRUCTION
75 LF 12" SICPP
ST
@ 1.00% MIN. 599
600
601
MATCH TO INSET
ST
300 Pearl Street, Suite 130
Buffalo, NY 14202
END SECTION
INV=583.66 716-551-6281
12 LF 12" SICPP @ 1.00%
599
ST
600 labellapc.com
600
599 60
1
C0
598
ST
UD UD UD UD UD UD UD UD UD UD UD UD D
598
600.14 599
600
NEW BIORETENTION 600
AREA #1 (± 350 SF) ST-4.0
599
600
ST
75 LF 12" SICPP 4' DIA. MH
ST-4.1
597
597
598
599
ST
598
RIM=600.25
599
@ 1.00% MIN. 599
600 24"x24" CB N INV=594.36
600
600
RIM=599.00 W INV=594.46
601 N INV=594.58 S INV=595.25
6" SICPP @
ST
1.00% MIN.
ST
EXP: EXP:
ST
N CERTIFICATE OF AUTHORIZATION NUMBER:
2 INSET 60
0 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
C301 SCALE: 1"=20' GEOLOGICAL: 0021659
ST
NEW PRIVATE
FIRE HYDRANT
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
FS
ST-3.4 Sec. 7307, for any person, unless acting under the direction of a licensed
ST
24"x24" CB architect, professional engineer, or land surveyor, to alter an item in any
ST
RIM=599.65 way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
S INV=597.58
the item their seal and notation "altered by" followed by their signature and
FS
date of such alteration, and a specific description of the alteration.
ST
ST
© 2024
2026 LaBella Associates
FS
600
ST
ST
NEW 6" FIRE SERVICE
600
600
(AFTER BACKFLOW
PREVENTOR)
HOME LEASING
598
FS
598
599
599
ST
75 S CLINTON AVE SUITE 700,
600
ST
ROCHESTER, NEW YORK 14604
150 LF 12"
SICPP @ 1.00%
FS
ST
600
ST
595
596
FS
597
ST
598
ST
FS
NEW BACKFLOW PREVENTOR (IN FS
ST
MECHANICAL ROOM) FOR COMBINED
ST
SERVICE. DOMESTIC SERVICE WILL BE
PROPOSED METERED AFTER THE BACKFLOW.
600
600
W
3-STORY C0
ST
BUILDING C0
W
± 25,000 SF FOOTPRINT ST-3.3
ST
24"x24" CB
RIM=599.75
FFE=600.75' 6" SICPP @ N INV=596.08 WEST SENECA APARTMENTS
599
ST
599
1.00% MIN. SW INV=596.08
2544 CLINTON ST,
W
WEST SENECA, NY 14224
595
596
597
598
NEW 6" PVC SDR-21 C0
ST ST ST ST ST ST ST ST ST ST
ST
ST
ST ST ST ST ST ST
SA
SANITARY LATERAL
600
599
600
W
SA
C0
ST
CONNECT INTO
600
600
EXISTING
SAN CO 600
ST
SANITARY MAIN SA
SA
SA TYP.
SA
C0
SA
W
60
SA
0
S SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA C0
SA SA
ST
4' DIA. SAN MH SA SA SA SA SA SA SA
SAN CO 600
RIM=600.15 NEW 6" PVC SDR-21 102 LF 12"
TYP. SAN CO
E INV=589.50 SICPP @ 1.00%
SA
SANITARY LATERAL
ST
TYP. NO: DATE: DESCRIPTION:
W INV=589.40 70 LF 6" SICPP
W
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
@ 1.00% MIN. Revisions
ST
SA
ST-3.0
PROJECT NUMBER:
ST
ST-2.0 4' DIA. MH
2241067
SA
W
4' DIA. MH RIM=599.33
RIM=599.29 N INV=593.25
599
599
ST
W INV=592.12 S INV=592.25 DRAWN BY:
600
E INV=591.25 EMM / SCB
SA
W INV=591.25
ST
30 LF 12" SICPP REVIEWED BY:
SRV / DPB
W
D D
50 5LF
99 12" SICPP @ 5.00%
SA
@ 5.00% 599
ISSUED FOR:
ST
ST-2.2 SITE PLAN APPROVAL
59
24"x24" CB
9
SA
ST-1.1
ST
ST
RIM=598.62
W
4' DIA. MH DATE:
E INV=596.12 599 ST 85 LF 12" SICPP 4/20/2026
RIM=599.08
E INV=591.25 @ 2.00%
SA
SAN CO
ST ST ST ST ST ST ST ST
TYP. W INV=591.25 35 LF 12" SICPP DRAWING NAME:
C0 D D
ST ST ST ST ST ST ST @ 3.00%
W
ST-3.2
SA
120 LF 8" SICPP ST-2.1 ST-3.1
END SECTION ST-1.0 24"x24" CB
@ 1.00% 24"x24" CB 24"x24" CB NEW 6" COMBINED
ADS STORMTECH CHAMBER RIM=598.50
INV=589.75 RIM=598.87 CONTECH CASCADE CS4 WQU RIM=598.89
599 SYSTEM SC-3500 WATER SERVICE
NE INV=595.00
SA
W INV=593.62 RIM=599.00 N INV=593.30
NE INV=593.62 E INV=591.15 (100 CHAMBERS) W INV=593.30 599 W INV=595.00
W
NEW 4" PVC SDR-21 W INV=591.15
NEW PRIVATE
INV=591.25
UTILITY PLAN
SA
SANITARY LATERAL FIRE HYDRANT
MATCH TO SHEET: C302
SA
W
FS
600
DRAWING NUMBER:
SA
W
C0
600
UTILITY PLAN NOTES:
4/20/2026 1:18:02 PM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PLAN 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C301
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C301 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 28 of 1174
Page 29
599
CONTECH CASCADE CS4 WQU RIM=598.89 WATER SERVICE
SYSTEM SC-3500 NE INV=595.00
SA
W INV=593.62 RIM=599.00 N INV=593.30 24
NOT FOR CONSTRUCTION
NE INV=593.62 E INV=591.15 (100 CHAMBERS) W INV=593.30 599 W INV=595.00
W
NEW 4" PVC SDR-21 W INV=591.15 INV=591.25
NEW PRIVATE
SA
SANITARY LATERAL FIRE HYDRANT
MATCH TO SHEET: C301
SA
W
300 Pearl Street, Suite 130
FS
600 Buffalo, NY 14202
716-551-6281
SA
W
C0
SAN CO NEW 6" FIRE SERVICE 600 labellapc.com
FS
TYP. (AFTER BACKFLOW
PREVENTOR)
598
599
598
W
599
DS
599
W
W
EXP: EXP:
W
CERTIFICATE OF AUTHORIZATION NUMBER:
DS PROFESSIONAL ENGINEERING: 0021272
NEW BACKFLOW PREVENTOR LAND SURVEYING: 0021271
(IN MECHANICAL ROOM) FOR GEOLOGICAL: 0021659
W
598
COMBINED SERVICE.
597
DOMESTIC SERVICE WILL BE
597
598
599
METERED AFTER THE It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
BACKFLOW. NEW BIORETENTION Sec. 7307, for any person, unless acting under the direction of a licensed
600
AREA #2 (± 370 SF) architect, professional engineer, or land surveyor, to alter an item in any
W
C0
ST-5.2 UD
way. If an item bearing the seal of an architect, engineer, or land surveyor
24"x24" CB is altered; the altering architect, engineer, or land surveyor shall affix to
599 UD
RIM=597.00 the item their seal and notation "altered by" followed by their signature and
598 UD
W INV=592.58 UD date of such alteration, and a specific description of the alteration.
597
UD
W
596 UD
UD
132 LF 12" UD UD © 2024
2026 LaBella Associates
UD UD UD
60 SICPP @ 0.50% UD
596
W
0
ST
NEW 6" COMBINED 597
W
ST 598
WATER SERVICE
STW
W W W W W W W W W W W W W
HOME LEASING
T
ST 600
W
75 S CLINTON AVE SUITE 700,
ST-5.0 ST
ROCHESTER, NEW YORK 14604
4' DIA. MH
ST
RIM=599.08
S INV=591.30 598
59
ST
9
W
E INV=591.92
W INV=591.20 ST
59 597
T
D
ST 9
ST
ST 596
ST 28 LF 12" SICPP 6
ST 59 7
ST
W
ST @ 1.00% 59 8
ST
ST ST-5.1 59
ST
ST 9
598
ST
ST 220 LF 12" 598 24"x24" CB 59
ST SICPP @ 0.50% 597 RIM=596.00
596 N INV=591.58
W
END SECTION 595
UD UD UD
UD UD UD
INV=589.00 C0
UD UD UD UD UD UD
T
UD
UD
UD
UD
UD
595
W
NEW BIORETENTION
NEW 6" COMBINED
AREA #3 (± 700 SF)
WATER SERVICE
9
59
W
ST-6.0 596
4' DIA. MH 597
WEST SENECA APARTMENTS
T
RIM=597.50 598
E INV=590.10 2544 CLINTON ST,
598
599
597
W
596
595
595
W INV=590.00
596
597
WEST SENECA, NY 14224
598
599
ST ST ST ST ST D ST ST ST ST ST ST ST ST ST ST
ST ST ST ST ST
175 LF 12" 175 LF 12"
W
END SECTION ST-6.1
T
SICPP @ 1.00% SICPP @ 1.00%
INV=5#.## 36"x36" CB
RIM=594.35
598
W INV=591.85
W
T
NO: DATE: DESCRIPTION:
CONNECT TO EXISTING 6"
W
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
WATERMAIN WITH TS&V Revisions
PROJECT NUMBER:
2241067
W
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
UTILITY PLAN
DRAWING NUMBER:
UTILITY PLAN NOTES:
4/20/2026 1:17:32 PM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PLAN 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C302
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C302 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 29 of 1174
Page 30
NOT FOR CONSTRUCTION
599
600
601
601.17
601.62
300 Pearl Street, Suite 130
Buffalo, NY 14202
594.92
716-551-6281
601.26
599
600 600.87
labellapc.com
600
599 60
1
C0
598
UD UD UD UD UD UD UD UD UD UD UD UD D
598
599
600
600 600.54 600.90
INSTALL AND MAINTAIN
599
600
TEMPORARY SILT SOCK
597
597
598
599
600.10
598
599
600.18
600
600
600.54 600.54 600.72
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
60
0 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
600.39 TC 600.84 TC
599.89 BC 600.34 BC It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2024
2026 LaBella Associates
600
600
600
HOME LEASING
598
598
599
599
75 S CLINTON AVE SUITE 700,
600
ROCHESTER, NEW YORK 14604
600
595 600.78 TC
596 600.28 BC 601.23 TC
597 600.73 BC
598
PROPOSED
600
600
3-STORY C0
BUILDING C0
± 25,000 SF FOOTPRINT
FFE=600.75' WEST SENECA APARTMENTS
599
599
600.92 TC
600.42 BC
2544 CLINTON ST,
600.91 TC
WEST SENECA, NY 14224
595
600.41 BC
596
597
598
600.14
C0
600
599
600
C0
600.38 TC 600.67 TC 600.68 TC 600.79 TC
600.11 600 600.50 TC
599.09 HP
600
599.88 BC 600.17 BC 600.18 BC 600.29 BC 600.00 BC
600 600.63 TC 600.63 TC
C0
600.27 600.13 BC 600.13 BC
60
600.63 TC
0
S
C0
600.13 BC
600
RIM=600.15
600.04 599.87
NO: DATE: DESCRIPTION:
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C400 GRADING PLAN.dwg
Revisions
599.92 TC 600.13 TC 599.91 TC 599.59 TC PROJECT NUMBER:
599.42 BC 599.63 BC 599.41 BC 599.09 BC 2241067
599
599
599.49 TC DRAWN BY:
600
598.99 BC EMM / SCB
REVIEWED BY:
599 D D SRV / DPB
599
ISSUED FOR:
SITE PLAN APPROVAL
59
9
DATE:
599 598.89 4/20/2026
DRAWING NAME:
599.34 TC C0 D D 599.72 TC 599.32 TC 599.05 TC
598.84 BC 599.22 BC 598.82 BC 598.55 BC
599.16
599.48 TC 599
598.98 BC
599.48 599.62
599 GRADING, EROSION, AND
SEDIMENT CONTROL PLAN
MATCH TO SHEET: C402 599.84
599.80
600.27 TC 600.37 TC 600.45 TC 600.44 TC 600.11 TC 600.02 TC 599.80 TC
599.98 TC 599.61 BC 599.52 BC 599.30 BC
599.48 BC 599.77 BC 599.87 BC 599.95 BC 599.94 BC
600
600.17 DRAWING NUMBER:
599.19 599.46
C0
600 599.87
4/20/2026 1:17:56 PM
N
1
GRADING, EROSION, AND SEDIMENT CONTROL PLAN 0' 20' 40' 60'
C401 SCALE: 1" = 20'
C401
Page 30 of 1174
Page 31
599.48 TC 599
598.98 BC 24
NOT FOR CONSTRUCTION
599
599.48 599.62
MATCH TO SHEET: C401
599.80 599.84
600.27 TC 600.37 TC 600.45 TC 600.44 TC 600.11 TC 600.02 TC 599.80 TC
599.98 TC 599.61 BC 599.52 BC 599.30 BC
599.77 BC 599.87 BC 599.95 BC 599.94 BC
599.48 BC 300 Pearl Street, Suite 130
FS
600 Buffalo, NY 14202
600.17 716-551-6281
599.19 599.46
C0
600.50 600.50 600.37 600 599.87 labellapc.com
600.20
FS
598.74
598
599
598
600.45
599
DS
599
599.24
598.95
600.45
598.50
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
DS PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
598
600.54
597
597
600.22
598
599
600.36 600.61 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
600.43 Sec. 7307, for any person, unless acting under the direction of a licensed
600
598.09
C0 598.54 architect, professional engineer, or land surveyor, to alter an item in any
INSTALL AND MAINTAIN way. If an item bearing the seal of an architect, engineer, or land surveyor
TEMPORARY SILT SOCK is altered; the altering architect, engineer, or land surveyor shall affix to
599 the item their seal and notation "altered by" followed by their signature and
598
date of such alteration, and a specific description of the alteration.
597
596
600.50 © 2024
2026 LaBella Associates
60 600.29 600.30 596
0 600.11 600.04
600.02
599.53 597
598
600.17 TC
599.67 BC 600
600.18
598.01 HOME LEASING
599.50 TC 75 S CLINTON AVE SUITE 700,
599.00 BC
599.94 TC 599.88 ROCHESTER, NEW YORK 14604
599.44 BC
INSTALL AND MAINTAIN
598
59
TEMPORARY CONCRETE 600.04 TC 598.46
9
600.03
WASHOUT 599.54 BC
599.54
D 59
9 597 599.84
599.04 596
599.99 6
598.32 59 7
599.17 59 8
59
9
598
598 59
597
596
595
C0 599.46 TC
598.96 BC
599.46
595
599.34 TC
598.84 BC
INSTALL AND MAINTAIN
TEMPORARY SILT SOCK 9
59
596
597
598
WEST SENECA APARTMENTS
2544 CLINTON ST,
598
599
597
596
595
595
596
597
WEST SENECA, NY 14224
598
599
599.70 TC
D 599.20 BC
INSTALL AND MAINTAIN TEMPORARY
CONSTRUCTION ENTRANCE
599.65
598
600.11 TC NO: DATE: DESCRIPTION:
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C400 GRADING PLAN.dwg
599.61 BC
Revisions
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
GRADING, EROSION, AND
SEDIMENT CONTROL PLAN
DRAWING NUMBER:
4/20/2026 1:17:35 PM
N
1
GRADING, EROSION, AND SEDIMENT CONTROL PLAN 0' 20' 40' 60'
C402 SCALE: 1" = 20'
C402
Page 31 of 1174
Page 32
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
STORM SEWER GRATE way. If an item bearing the seal of an architect, engineer, or land surveyor
12 is altered; the altering architect, engineer, or land surveyor shall affix to
"
OV MIN the item their seal and notation "altered by" followed by their signature and
ER IM 2" X 2" WOODEN SPIKES
LA UM date of such alteration, and a specific description of the alteration.
P PLACED 10' O.C.
BLOWN/PLACED FILTER MEDIA COMPOST FILTER SOCK
© 2024
2026 LaBella Associates
DISTURBED AREA UNDISTURBED AREA
MIN.
12"
2
1 SLOPE OR LESS
EXISTING CONTOURS
SECTION VIEW HOME LEASING
75 S CLINTON AVE SUITE 700,
FILTER SOCK FILLED ROCHESTER, NEW YORK 14604
8'
WITH CRUSHED STONE
DISTURBED AREA
FLO
W
FLO
W
SECURE FILTER SOCK
AS RECOMMENDED MIN. SLOPE MIN. SLOPE
STORM SEWER GRATE BY MANUFACTURER SILT FENCE
FLOW FLOW NOTES:
2" X 2" WOODEN STAKES
1. AREA CHOSEN FOR STOCKPILING OPERATIONS SHALL BE DRY AND STABLE.
PLACED 10' O.C.
2. MAXIMUM SLOPE OF STOCKPILE SHALL BE 1V:2H.
UNDISTURBED AREA
3. UPON COMPLETION OF SOIL STOCKPILING, EACH PILE SHALL BE SURROUNDED WITH
COMPOST FILTER SOCK
SILT FENCING, THEN STABILIZED WITH VEGETATION OR COVERED.
PLAN VIEW 4. SEE SPECIFICATIONS AND DETAIL FOR INSTALLATION OF SILT FENCE.
6 INLET PROTECTION IN PAVEMENT 5 COMPOST FILTER SOCK 4 TEMPORARY SOIL STOCKPILE
C501 N.T.S. C501 NYS DEC DETAIL: COMPOST FILTER SOCK C501 N.T.S.
WOVEN WIRE FENCE (MIN. 14 GAUGE W/
MAX. 6" MESH SPACING WITH FILTER CLOTH 36" MIN. FENCE
POSTS, DRIVEN MIN.
WEST SENECA APARTMENTS
10' MAX. C. TO C.
16" INTO GROUND 2544 CLINTON ST,
50' MIN. MOUNTABLE
WEST SENECA, NY 14224
BERM (OPTIONAL)
MIN.
6"
EXISTING
PAVEMENT
FILTER = 18"
3' 5:1
HEIGHT OF
MIN.
10' TYP. 2"
STAKE (TYP.)
EXISTING GROUND FILTER CLOTH
4"
MIN.
PROFILE VIEW
6"
1/8" DIA. STEEL WIRE
W
FLO
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
50' MIN. STAPLE DETAIL W
FLO
B B NO: DATE: DESCRIPTION:
10' MIN.
10' TYP.
PERSPECTIVE VIEW 1 41" SQUARE HARDWOOD Revisions
EXISTING GROUND
# STAPLES (2 PER BALE) BINDING WIRE 36" MIN. FENCE POST
C### PROJECT NUMBER:
12' MIN.
12' MIN.
EXISTING STRAW BALE (TYP.)
2241067
WOVEN WIRE FENCE (MIN. 14 GAUGE W/
3' TYP.
PAVEMENT MAX. 6" MESH SPACING WITH FILTER CLOTH
IMPERMEABLE SHEETING DRAWN BY:
20" MIN.
EMM / SCB
REVIEWED BY:
SYMBOL IMPERMEABLE SHEETING STRAW BALE (TYP.) WOOD OR METAL STAKES (2 PER BALE) UNDISTURBED SRV / DPB
FLOW GROUND
PLAN SECTION B-B ISSUED FOR:
PLAN VIEW NOTE: SITE PLAN APPROVAL
EMBED FILTER CLOTH A MIN. OF 6" IN GROUND
1. CAN BE TWO STACKED BALES OR PARTIALLY EXCAVATED TO REACH 3 FT DEPTH DATE:
CONSTRUCTION SPECIFICATIONS: 4" MIN. 4/20/2026
16" MIN.
1. STONE SIZE - USE 1-4 INCH STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT.
CONSTRUCTION SPECIFICATIONS SYMBOL
DRAWING NAME:
2. LENGTH - NOT LESS THAN 50 FEET. COMPACTED SOIL
1. LOCATE WASHOUT STRUCTURE A MINIMUM OF 100 FEET AWAY FROM OPEN CHANNELS, STORM DRAIN INLETS, SENSITIVE AREAS, WETLANDS,
3. THICKNESS - NOT LESS THAN SIX (6) INCHES. BUFFERS AND WATER COURSES AND AWAY FROM CONSTRUCTION TRAFFIC.
4. WIDTH - TWENTY-FOUR (24) FOOT IF SINGLE ENTRANCE TO SITE. 2. SIZE WASHOUT STRUCTURE FOR VOLUME NECESSARY TO CONTAIN WASH WATER AND SOLIDS AND MAINTAIN AT LEAST 4 INCHES OF FREEBOARD.
5. GEOTEXTILE - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE.
6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ACCESS SHALL BE PIPED
TYPICAL DIMENSIONS ARE 10 FEET X 10 FEET X 3 FEET DEEP.
NOTES: SECTION VIEW
3. PREPARE SOIL BASE FREE OF ROCKS OR OTHER DEBRIS THAT MAY CAUSE TEARS OR HOLES IN THE LINER. FOR LINER, USE 10 MIL OR THICKER UV
BENEATH THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. RESISTANT, IMPERMEABLE SHEETING, FREE OF HOLES AND TEARS OR OTHER DEFECTS THAT COMPROMISE IMPERMEABILITY OF THE MATERIAL.
7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR
FLOWING OF SEDIMENT ONTO PUBLIC RIGHT OF WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED
4.
5.
PROVIDE A SIGN FOR THE WASHOUT IN CLOSE PROXIMITY TO THE FACILITY.
KEEP CONCRETE WASHOUT STRUCTURE WATER TIGHT. REPLACE IMPERMEABLE LINER IF DAMAGED (E.G., RIPPED OR PUNCTURED). EMPTY OR
1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. POSTS SHALL BE STEEL
EITHER "T" OR "U" TYPE OR HARDWOOD. CONSTRUCTION DETAILS
ONTO PUBLIC RIGHTS OF WAY MUST BE REMOVED IMMEDIATELY. REPLACE WASHOUT STRUCTURE THAT IS 75 PERCENT FULL, AND DISPOSE OF ACCUMULATED MATERIAL PROPERLY. DO NOT REUSE PLASTIC LINER. 2. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION.
8. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN WET-VACUUM STORED LIQUIDS THAT HAVE NOT EVAPORATED AND DISPOSE OF IN AN APPROVED MANNER. PRIOR TO FORECASTED RAINSTORMS, FENCE SHALL BE WOVEN WIRE, 6" MAXIMUM MESH OPENING.
APPROVED SEDIMENT TRAPPING DEVICE. REMOVE LIQUIDS OR COVER STRUCTURE TO PREVENT OVERFLOWS. REMOVE HARDENED SOLIDS, WHOLE OR BROKEN UP, FOR DISPOSAL OR 3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER-LAPPED BY SIX INCHES AND FOLDED.
9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN EVENT. RECYCLING. MAINTAIN RUNOFF DIVERSION AROUND EXCAVATED WASHOUT STRUCTURE UNTIL STRUCTURE IS REMOVED. FILTER CLOTH SHALL BE EITHER FILTER X, MIRAFI 100X, STABLINKA 140N, OR APPROVED EQUAL.
4. PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVED EQUAL.
5. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE.
3 STABILIZED CONSTRUCTION ENTRANCE 2 CONCRETE WASHOUT AREA WITH STRAW BALES 1 SILT FENCE DRAWING NUMBER:
C501 N.YS DEC DETAIL: STABILIZED CONSTRUCTION ACCESS C501 N.T.S. C501 NYS DEC DETAIL: SILT FENCE
4/20/2026 1:17:16 PM
C501
Page 32 of 1174
Page 33
NOT FOR CONSTRUCTION
SPACES SHOULD BE
EQUAL TO LINE WIDTH
NY R7-8 MUTCD R7-1 NY R7-8
300 Pearl Street, Suite 130
12"
1 MATCH ENDS OF TRANSITION
2" PREMOULDED Buffalo, NY 14202
CURB TO ADJACENT CURBS (OR
8"
BITUMINOUS CURB
UNLESS OTHERWISE
POST MOUNT SIGN OR
716-551-6281
NOTED ON PLANS
FLUSH WITH GRADE - SEE PLANS)
JOINT FILLER EXPANSION CAP
12
2" SIGN MOUNTED ON
"
8"
BOLLARD. SEE SITE
TOP OF CURB labellapc.com
7'-0"
TYP.
45°
PLAN (TYP.)
FLUSH CURB
4" WIDE
SEE PLANS
6"
PARKING
1'-4"
SPACE
PAVEMENT
12"
MARKING
1'-0"
1" 4'-0"
3'-0" MIN. NOTES:
#4 1'-6" LONG THIS PART OF DOWEL TO 6'-0" MAX.
4'-0"
BE PAINTED AND OILED 1. ALL STRIPING SHALL BE WHITE
ELEVATION AT EXPANSION JOINT TERMINAL/TRANSITION CURB 11 CROSSWALK
8' TYP. 8' TYP.
C502 N.T.S.
PAVEMENT SYMBOL PER ADA
WHITE ON BLUE BACKGROUND EXP: EXP:
NOTE: ALL PARKING STRIPING TO BE YELLOW 3
TOP OF CURB 8" CAP SCREW
#4 1'-6" LONG 3
8" FLAT WASHER
A
12 ADA PARKING SPACE STRIPING (ZINC PLATED)
CERTIFICATE OF AUTHORIZATION NUMBER:
SIGN FACE
C502 NEW SIGN PANEL (16 PROFESSIONAL ENGINEERING: 0021272
EXPANSION JOINT MATERIAL N.T.S. 2" x 2" SQ.
ROUNDED GA. GALV. STEEL) LAND SURVEYING: 0021271
AT CONCRETE SIDEWALKS
D
GEOLOGICAL: 0021659
D/2
R=1" 3
8" HEX NUT
CONCRETE SIDEWALK 8" (ZINC PLATED)
2"
A A
1
OR TOPSOIL
SECTION A-A
A CONSTRUCTION JOINT TOP OF PAVEMENT It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
TYP.
SEE PAVEMENT SECTION
6"
architect, professional engineer, or land surveyor, to alter an item in any
ELEVATION AT 2" x 2" SQUARE UNISTRUT POST way. If an item bearing the seal of an architect, engineer, or land surveyor
(GALV. STEEL) VARIABLE
1'-6"
CONSTRUCTION JOINT is altered; the altering architect, engineer, or land surveyor shall affix to
LENGTH (PERFORATED) the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SELECT DOMED CONCRETE FILL NEW SIGN PANEL (16 DOMED CONCRETE FILL
6" BACKFILL GA. GALV. STEEL)
7'-0" (MAX.)
5'-0" (MIN.)
MATERIAL CONTINUOUS BED © 2024
2026 LaBella Associates
6" O.D. STEEL PIPE WITH PLASTIC
SUBBASE COURSE 6" O.D. STEEL PIPE WITH PLASTIC
1'-9" (MIN.)
SLEEVE (YELLOW) A A SLEEVE (YELLOW)
MIN.
6"
DOWEL
3'-6"
D
3'-6"
DOMED IN GRASS AREA 2 14" x 2 1 4" SQUARE UNISTRUT
D/2
6" 6" FLUSH IN CONCRETE
OR PAVED AREA 2" x 2" SQUARE UNISTRUT POST POST BASE (GALVANIZED STEEL)
2"
3"
VERTICAL
(GALV. STEEL) VARIABLE
LENGTH (PERFORATED)
3
8" CAP SCREW
DOMED IN GRASS AREA
HOME LEASING
3
8" FLAT WASHER
75 S CLINTON AVE SUITE 700,
SECTION A-A
7'-0" (MAXIMUM)
5'-0" (MINIMUM)
(ZINC PLATED) ROCHESTER, NEW YORK 14604
SEE ASPHALT
TYPICAL SIGN FACE
PAVEMENT
TYPICAL
DETAILS
GRASS
PAVED AREA 2" x 2" SQ.
NOTES: AREA
4000 PSI CONCRETE 2 14" x 2 14" SQUARE UNISTRUT
3'-6"
3
8" HEX NUT (ZINC PLATED)
3'-6"
1. SLOPE TOP OF CURB 1/4" PER FOOT TOWARD PAVEMENT. POST BASE (GALVANIZED STEEL)
2. CONTRACTION JOINTS SHALL BE FORMED OR SAWCUT EVERY 10 FEET TO DEPTHS SLIGHTLY BELOW THE PAVEMENT SURFACE. UNDISTURBED EARTH SECTION A-A
4" TO 6"
3. EXPANSION JOINTS 1/2" IN WIDTH SHALL BE FORMED WITH A PREMOULDED BITUMINOUS JOINT FILLER EVERY 40 FEET. OR 18" SONOTUBE 5,000 PSI CONCRETE
3" x 3 8" BOLT (ZINC PLATED)
4. EXPANSIONS JOINTS AND FORMED CONTRACTION JOINTS ARE TO BE EDGED WITH CONCRETE FINISHING TOOLS. SUBBASE COURSE AND 3 8" 0 NUT (ZINC PLATED) UNDISTURBED EARTH
5. CONCRETE SEALING AGENT SHALL BE APPLIED THE SAME DAY THAT CURBS ARE CONSTRUCTED. NOTES:
6"
OR 18" SONOTUBE
4'-0"
6"
6. CONCRETE CURBING WITHIN R.O.W. SHALL CONFORM WITH NYSS M609-2R1.
7. CURB THICKNESS T IS TO BE 5" OR AS INDICATED ON THE DRAWINGS. 1. MAINTAIN TWO FEET OF CLEARANCE FROM SUBBASE COURSE
8" MIN.
8" MIN.
8. PROVIDE 0" CURB REVEAL FOR HEADER CURB CURB AT SIDEWALK RAMPS AND 1" CURB REVEAL FOR HEADER CURB AT DRIVEWAYS. FACE OF CURB TO ANY PART OF SIGN, AS
9. ALL CURB, EXCEPT HEADER CURB USED FOR SIDEWALK ACCESS RAMPS, IS TO HAVE THE 1" RADIUS. NOTE: APPLICABLE.
10. GRADED STONE BACKING IS TO BE PLACED WHEN SIDEWALK DOES NOT ABUT CURB. 2. SEE PLANS FOR SIGN AND POST LOCATIONS. NOTES:
1. FINAL LOCATION OF BOLLARDS SHALL BE APPROVED
11. USE 5000 PSI CONCRETE FOR CONVENTIONALLY FORMED CURB. AND 5000 PSI CONCRETE FOR MACHINE FORMED CURB. BY THE OWNER OR ARCHITECT/ENGINEER.
1. FINAL LOCATION OF BOLLARDS SHALL BE APPROVED BY THE OWNER OR ARCHITECT/ENGINEER.
10 CONCRETE CURB 9 BOLLARD 8 POST MOUNT SIGN 7 BOLLARD MOUNTED SIGN
C502 N.T.S. C502 N.T.S. C502 N.T.S. C502 N.T.S.
INITIAL FULL DEPTH SAW CUT
FINAL SAW CUT. MATCH EXISTING SEE NOTE 2
PAVEMENT. CAP SEAM WITH
BITUMINOUS SEALER. (SEE NOTE 2)
TOP COURSE
BINDER COURSE
WEST SENECA APARTMENTS
SEE NOTE 2 18" SUBBASE COURSE 2544 CLINTON ST,
WEST SENECA, NY 14224
EXISTING
ASPHALT PAVEMENT NOTES: PAVEMENT
1. HMA ITEMS ARE BASED ON PG 64-22 BINDER, ESALs LESS THAN 30,000,000. TACK COAT IS REQUIRED BETWEEN ALL LIFTS OF ASPHALT. USE OF POLYPHOSPHORIC ACID (PPA) TO MODIFY THE BINDER
6"x6" WELDED WIRE EXISTING
PROPERTIES IS PROHIBITED. THIS PROHIBITION ALSO APPLIES TO THE USE OF PPA AS A CROSS-LINKING AGENT FOR POLYMER MODIFICATION.
TOP AND BOTTOM SUBBASE
8" THICK
2. BUTT JOINTS, CREATED BY A FULL-DEPTH SAWCUT, SHALL BE USED BETWEEN NEW AND EXISTING PAVEMENTS. THE ASPHALT TOP COURSE SHALL BE LAID SUCH THAT IT UNIFORMLY OVERLAPS THE 4,500 PSI CONCRETE
ADJACENT COLD MAT BY 2"-3". THE THICKNESS OF THE OVERLAP MATERIAL SHALL BE 1/4 THE COMPACTED THICKNESS OF THE COURSE, SO AS TO RESULT IN A SMOOTH AND WELL-COMPACTED JOINT
AFTER ROLLING. BROADCASTING OF THE OVERLAP MATERIAL ONTO THE LANE IS NOT ALLOWED. IF THE OVERLAP IS EXCESSIVE, THE EXCESS MATERIAL SHALL BE TRIMMED OFF SO THAT THE MATERIAL x x x x x x x
ALONG THE JOINT IS UNIFORM. THE COARSE PARTICLES OF AGGREGATE IN THE OVERLAP MATERIAL SHALL BE REMOVED AND WASTED IF DEEMED NECESSARY BY THE INSPECTOR.
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
x x x x x x GEOTEXTILE STABILIZATION
3. DESIGN PGB CONTENT SELECTION: THE PRODUCER SELECTS THE DESIGN PGB CONTENT THAT RESULTS IN A COMPACTED DENSITY OF 96.5% Gmm AT THE DESIGN NUMBER OF GYRATIONS (Ndesign). 12" COMPACTED FABRIC (SEE ASPHALT
1 21" 9.5 F2 TOP COURSE HMA UNDER NO CIRCUMSTANCES SHALL THE PERFORMANCE GRADED BINDER CONTENT IN THE HMA MIXTURE BE LESS THAN 5.8% FOR A 9.5 DESIGN, 5.2% FOR A 12.5 DESIGN, 4.5% FOR A 19.0 DESIGN, 4.2% SUBBASE MATERIAL NO: DATE: DESCRIPTION:
PAVEMENT DETAILS)
80 SERIES COMPACTION FOR A 25.0 DESIGN, OR 3.7% FOR A 37.5 DESIGN. ALL VOLUMETRIC AND MECHANICAL PROPERTIES ARE CHECKED AT THIS PGB CONTENT TO ENSURE THAT ALL REQUIREMENTS ARE MET. NOTES: Revisions
NYSDOT ITEM NO. 402.098202 WELL COMPACTED SUBGRADE
2-1/2" 19.0 F9 BINDER COURSE HMA 4. PERFORM ALL WARRANTY WORK IN ACCORDANCE WITH MATERIALS PROCEDURE (MP) 402-01, WARRANTY REQUIREMENTS FOR HOT MIX ASPHALT (HMA) TOP COURSE. 1. VERTICALLY SAW CUT ALL ASPHALT FULL DEPTH.
80 SERIES COMPACTION 2. BLOW CLEAN AND APPLY TACK COAT 0.050 GAL/SY AT ALL ASPHALT TO ASPHALT SURFACES. PROJECT NUMBER:
COMPACTED
NYSDOT ITEM NO. 402.198902 5. AS PER STANDARD SPECIFICATION SECTION 401-4.01 CERTIFIED PRODUCTION, PRODUCTION LESS THAN 500 TONS, AND HIGHWAY PERMIT PRODUCTION, PRODUCTION MEETING THE SPECIFICATION 3. REFER TO STANDARD DUTY PAVEMENT SECTION DETAIL FOR COURSE THICKNESS. 2241067
SUBGRADE
REQUIREMENTS WILL BE ASSIGNED A QAF OF 1.00. PRODUCTION FAILING TO MEET THE SPECIFICATION REQUIREMENTS WILL BE SUBJECT TO EVALUATION ACCORDING TO SECTION 401-4.03, EVALUATION
6" 37.5 F9 BASE COURSE HMA OF SUBLOTS REPRESENTED BY 0.85 QAF.
6 CONCRETE PAD 5 STANDARD DUTY PAVEMENT JOINT DRAWN BY:
80 SERIES COMPACTION EMM / SCB
NYSDOT ITEM NO. 402.378902 1 1/2" ASPHALT CONCRETE TOP COURSE C502 N.T.S. C502 N.T.S. REVIEWED BY:
2 1/2" ASPHALT CONCRETE BINDER COURSE SRV / DPB
12" SUBBASE COURSE, TYPE 2 12" STONE SUBBASE COURSE
(INSTALLED IN TWO 6" LIFTS) BEVEL EDGE ISSUED FOR:
NYSDOT ITEM NO. 304.12 ASPHALT EMULSION TACK 6" SITE PLAN APPROVAL
COAT NYSDOT ITEM
407.01 - TACK COAT FINISH GRADE DATE:
4/20/2026
MATCH ORIGINAL RESTORE LAWN DISTURBED BY CONSTRUCTION MATCH ENDS OF TRANSITION
CURB
SHOULDER SLOPE AND PROVIDE NEW 6" MINIMUM DEPTH CURB TO ADJACENT CURBS (OR DRAWING NAME:
MECHANICALLY SCREENED TOPSOIL CURB CURB TERMINAL FLUSH WITH GRADE - SEE PLANS)
EXTEND BASE COURSE AT FREE EDGE
FLUSH CURB
6"
1'-6" 6"
COMPACTED SUBGRADE
1'-6"
FINISHED GRADE FINISHED GRADE
GEOTEXTILE STABILIZATION FABRIC,
TENSAR T-130 OR APPROVED EQUAL CONSTRUCTION DETAILS
1'-0"
NOTES: RESTORE LAWN DISTURBED BY
6'-0" UNLESS
6'-0" CONSTRUCTION AND PROVIDE NEW
COMPACTED 1. PROVIDE ADDITIONAL SUBBASE MATERIAL WHERE FILL IS REQUIRED TO OBTAIN PROPER 6" MINIMUM DEPTH MECHANICALLY OTHERWISE NOTED
SUBGRADE SUBGRADE ELEVATION, OR TO REPLACE UNSUITABLE SUBGRADE MATERIAL. SCREENED TOPSOIL
4 PAVEMENT SECTION WITHIN R.O.W. 3 ASPHALT PAVEMENT SECTION 2 CURB TERMINAL 1 CURB TRANSITION
DRAWING NUMBER:
C502 N.T.S. C502 N.T.S. C502 N.T.S. C502 N.T.S.
4/20/2026 1:17:48 PM
C502
Page 33 of 1174
Page 34
NOT FOR CONSTRUCTION
SIDEWALK SIDEWALK GR B
AS
S
4'-0
GR SE " MIN
AD
E BR
EP
LA
300 Pearl Street, Suite 130
A EA N
KB
AC
Buffalo, NY 14202
KO A
FC A 716-551-6281
UR
B >5 7.5% MAX SLOPE 4'-0" MIN.
'
3'-0" SEE PLAN 3'-0"
labellapc.com
SEE CONCRETE SIDEWALK DETAIL
SEE CONCRETE SIDEWALK DETAIL
B
DETECTABLE
0" TOP OF PAVEMENT
WARNING SYSTEM 2'- GR
AS
S SECTION A-A
MEET FLUSH WITH
A TOP OF PAVEMENT 25% MAX SLOPE
MEET FLUSH WITH MEET FLUSH WITH TOP OF PAVEMENT 3'-0
TOP OF PAVEMENT "
DETECTABLE WARNING SYSTEM A
0" CURB REVEAL VARIES
DETECTABLE WARNING SYSTEM
ACCESS RAMP AT CORNER - ISOMETRIC OPTION 1 ACCESS RAMP - ISOMETRIC OPTION 3 A PAVEMENT
7.5%
CURB
TOP OF CURB 7.5% MAX SLOPE
SIDEWALK TYPE "B" RAMP ISOMETRIC
SIDEWALK
SECTION B-B EXP: EXP:
GR
NOTES:
AD TOP OF PAVEMENT
E BR TRANSITION FLUSH WITH PAVEMENT CERTIFICATE OF AUTHORIZATION NUMBER:
A EA 1. 7.5% IS MAXIMUM SLOPE OF ACCESS RAMP.
KB PROFESSIONAL ENGINEERING: 0021272
AC 2. SURFACE OF ACCESS RAMP IS TO BE STABLE, FIRM AND SLIP-RESISTANT. TEXTURE SURFACE WITH
KO A LAND SURVEYING: 0021271
FC
UR SECTION A-A COARSE BROOM RUNNING TRANSVERSE TO SLOPE OF ACCESS RAMP.
GEOLOGICAL: 0021659
B< 3. ENTIRE AREA OF ACCESS RAMP AND LANDING PAD IS TO BE 7 INCH THICK CONCRETE.
5'
SEE CONCRETE SIDEWALK DETAIL
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
SEE CONCRETE SIDEWALK DETAIL
7 SIDEWALK RAMP TYPE B Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
C503 N.T.S. way. If an item bearing the seal of an architect, engineer, or land surveyor
MEET FLUSH WITH is altered; the altering architect, engineer, or land surveyor shall affix to
A TOP OF PAVEMENT MEET FLUSH WITH the item their seal and notation "altered by" followed by their signature and
TOP OF PAVEMENT date of such alteration, and a specific description of the alteration.
DETECTABLE WARNING SYSTEM A
B
DETECTABLE WARNING SYSTEM
ACCESS RAMP AT CORNER - ISOMETRIC OPTION 2 ACCESS RAMP - ISOMETRIC OPTION 4 © 2024
2026 LaBella Associates
8 SIDEWALK RAMP TYPE D 3'-0"
MINIM
A UM TOP OF PAVEMENT TOP OF CURB
C503 N.T.S. WIDTH VARIES, SEE PLANS SIDEW 12 12
ALK 1 1
B
8"
DETECTABLE WARNING 6'-0"
3'-0" MIN.
SEE PLAN 6'-0"
HOME LEASING
4,500 PSI CONCRETE TOOLED NOTCH 38" x 83" VERTICAL CURB 75 S CLINTON AVE SUITE 700,
SYSTEM PER DETAIL 2'-0"
" MEET FLUSH WITH SECTION A-A ROCHESTER, NEW YORK 14604
R1
SLOPE AS SHOWN ON PLANS 6" UNLESS OTHERWISE SHOWN ON PLANS TOP OF PAVEMENT
A
TOP OF SIDEWALK RAMP TYPE A ISOMETRIC
5"
SLOPE PAVEMENT GRASS
VARIES
TOP OF CURB SIDEWALK
12 12
6"
SEE PAVEMENT 1 1 3'-0
"M
10"
SECTIONS 12 IN.
(SE
6'-0" HEADER EP
1 LA
N)
SUBBASE MATERIAL TRANSITION CURB TRANISITON
A
TOP OF PAVEMENT
6"
0"
2'-
1 12
2" 2" 8" VIEW A-A MEET FLUSH WITH
NOTES: 1:50
TOP OF PAVEMENT
8" 0" CURB REVEAL DETECTABLE WARNING SYSTEM
12
1. 1:12 IS MAXIMUM SLOPE OF ACCESS RAMP AND MAX
1 SIDEWALK
SIDE FLARE IN PAVED AREA.
6 CONCRETE SIDEWALK AND INTEGRAL VERTICAL CURB SECTION 2. SURFACE OF ACCESS RAMP IS TO BE STABLE,
A
FIRM AND SLIP-RESISTANT. TEXTURE SURFACE
C503 N.T.S. ACCESS LANDING PAD
WITH COARSE BROOM RUNNING TRANSVERSE
RAMP 3'-0" MINIMUM
TO SLOPE OF ACCESS RAMP.
3. ENTIRE AREA OF ACCESS RAMP AND LANDING
ACCESS RAMP - TYPE C ISOMETRIC
PAD IS TO BE 7 INCH THICK CONCRETE.
NOTES:
SECTION B-B
1. 1:12 IS MAXIMUM SLOPE OF ACCESS RAMP. WEST SENECA APARTMENTS
5 SIDEWALK RAMP TYPE A 2. SURFACE OF ACCESS RAMP IS TO BE STABLE, FIRM AND SLIP-RESISTANT. TEXTURE SURFACE
WITH COARSE BROOM RUNNING TRANSVERSE TO SLOPE OF ACCESS RAMP.
2544 CLINTON ST,
4" WIDE 3. ENTIRE AREA OF ACCESS RAMP AND LANDING PAD IS TO BE 7 INCH THICK CONCRETE. WEST SENECA, NY 14224
C503 N.T.S.
PARKING
SPACE
50%-60% OF 4 SIDEWALK RAMP TYPE C
PAVEMENT
MARKING BASE DIAMETER C503 N.T.S.
4'-0"
2'-0"
4'-0"
0.20"
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
5)
TE
E NO
0.90"-1.41" S (SE NO: DATE: DESCRIPTION:
1 1 SAW-CUT, OR WET CUT CONCRETE
ELECTRIC CHARGING STATION RIE 2" WIDE PREMOULDED BITUMINOUS 2" WIDE PREMOULDED BITUMINOUS
PAVEMENT SYMBOL VA JOINT FILLER WITH 5 8" DEEP X 12" WIDE JOINT FILLER WITH 5 8" DEEP X 12" WIDE WITH TROWEL OR JOINT TOOL, Revisions
1
SELF LEVELING CAULKING SEALANT SELF LEVELING CAULKING SEALANT 3 SLAB THICKNESS, FULL WIDTH.
DOME SECTION FINISHED GRADE FINISHED GRADE FINISHED GRADE
PROJECT NUMBER:
NO ISOMETRIC
2241067
ELECTRIC PARKING 1.625"- 2.41"
C TO C FILL JOINTS WITH UNILOCK POLYMERIC DRAWN BY:
EMM / SCB
VEHICLE
PARKING
ANY JOINT SAND OR APPROVED EQUIVALENT 1" THICK COMPACTED SETTING BED
OF WASHED COARSE AGGREGATE REVIEWED BY:
SRV / DPB
TIME TYPICAL WARNING UNIT
1.625"-2.41"
ONLY WHILE THIS PART OF DOWEL TO EXPANSION JOINT CONTROL JOINT
C TO C
CHARGING SIDEWALK ACCESS RAMP BE PAINTED AND OILED ISSUED FOR:
1" TO 4"
12" X 18" #4 - 16" LONG SMOOTH DOWEL AT 18" ON-CENTER
SITE PLAN APPROVAL
12" X 18" 2" DIAMETER WEEP HOLE AT LOW POINT
ELECTRIC VEHICLE EDGE OF RAMP CONCRETE DRILL AND EPOXY GROUT INTO EXISTING CONCRETE
ACCESSIBLE SYMBOL CHARGING STATION
NO PARKING FILL WITH SETTING BED MATERIAL SIDEWALK (CENTERED) AND EXISTING BUILDING DATE:
COLOR WHITE ON BLUE BACKGROUND MUTCD R7-1 FOUNDATION AT DOORWAYS. COAT DOWEL IN NEW 4/20/2026
SIDEWALK NOTES:
0.625"
FEDERAL DESIGNATION
7"
SURFACE WITH BOND BREAKER
CURB FLUSH WITH PAVEMENT DRAWING NAME:
1"-4"
1. CONCRETE SHALL BE 4,500 PSI AIR ENTRAINED MIX AT 28 DAYS
2. COMPACTED SUBBASE MATERIAL SHALL COMPLY WITH NYSDOT ITEM 304.14,
RESERVED 1" 0.625"
RESHAPE CURB BACKING
AT WEEP HOLE LOCATION
CONTRACTOR TO RESTORE LAWN DISTURBED BY
CONSTRUCTION AND PROVIDE NEW 6" MECHANICALLY TYPE 4
PARKING 12" X 18" BACK EDGE OF CURB
SCREENED TOPSOIL AND ESTABLISH TURF. 3. CONCRETE SURFACE SHALL RECEIVE A BROOM FINISH AND TWO COATS OF A
MEMBRANE FORMING SEALER AT RATES SPECIFIED BY THE PRODUCT
6" SUBBASE COURSE 5" 4,500 PSI CONCRETE
RESERVED MANUFACTURE.
NY R7-8
FEDERAL DESIGNATION
DOME SPACING SECTION 3"
6" COMPACTED SUBBASE MATERIAL 4. EXPANSION JOINTS SHALL BE PROVIDED AT ALL FITTED STRUCTURES AND AT
EVERY 25' ON CENTER.
CONSTRUCTION DETAILS
NOTES: 5. CONTROL JOINTS SHALL BE EVERY 5' OR AS SHOWN ON THE PLANS AND IN
12" X 6" ACCORDANCE WITH ACI 330-R92. THESE JOINTS SHALL BE COMPLETED
1. QUANTITY OF TRUNCATED DOMES SHOWN IS FOR ILLUSTRATIVE PURPOSES ONLY AND TO DEPICT REQUIRED SQUARE GRID PATTERN.
VAN VAN ACCESSIBLE
2. TRUNCATED DOMES ARE TO BE ALIGNED ON THE SQUARE GRID PATTERN IN THE PREDOMINANT DIRECTION OF TRAVEL.
WITHIN 24 HOURS OF CONCRETE PLACEMENT. SCORED JOINTS SHALL BE
ELECTRIC CHARGING SYMBOL ACCESSIBLE MUTCD R7-8a
3. ENTIRE DETECTABLE WARNING SYSTEM FIELD, INCLUDING TRUNCATED DOMES, IS TO BE DARK GRAY IN COLOR, N7 PER MUNSELL BOOK NOTATION, OR APPROVED EQUIVALENT.
1 1
4-INCH WIDTH MINIMUM AND 3 OF THE THICKNESS OF THE CONCRETE
4'x4', COLOR WHITE ON GREEN FEDERAL DESIGNATION 6. SIDEWALK ADJACENT TO THE CURB SHALL HAVE A 2.00% CROSS-SLOPE TO
4. OUTER EDGE OF THE DETECTABLE WARNING SYSTEM FIELD IS TO BE LOCATED SO THAT THE EDGE OF THE WARNING FIELD NEAREST TO THE STREET IS 1 TO 4 INCHES BEHIND THE BACK
BACKGROUND THE CURB. OTHER AREA AS INDICATED ON THE GRADING PLAN.
EDGE OF THE CURB SECTION.
7. ALL JOINTS AND EXPOSED EDGES SHALL BE ROUNDED WITH JOINT TOOL. DRAWING NUMBER:
5. DETECTABLE WARNING SYSTEM IS TO EXTEND ACROSS THE FULL WIDTH OF A SIDEWALK ACCESS RAMP, BUT NOT UP THE SIDE FLARES. COMPACTED SUBGRADE
PAVEMENT MARKINGS AND SIGNAGE BRICK DETECTABLE WARNING SYSTEM AT CURB CONCRETE SIDEWALK
4/20/2026 1:17:24 PM
3 2 1
C503 N.T.S. C503 N.T.S. C503 N.T.S.
C503
Page 34 of 1174
Page 35
NOT FOR CONSTRUCTION
COVER PIPE CONNECTION TO END INSTALL FLAMP ON 24" (600 mm) ACCESS PIPE OPTIONAL INSPECTION PORT
CAP WITH ADS GEOSYNTHETICS 601T PART #: MCFLAMP
NON-WOVEN GEOTEXTILE
MC-3500 CHAMBER
MC-3500 END CAP
6" MAX
PONDING 4.0H
MAX. PONDING/
HEIGHT 1V
RIM OF CB OVERFLOW ELEV. STORMTECH HIGHLY RECOMMENDS
FLEXSTORM INSERTS IN ANY UPSTREAM 300 Pearl Street, Suite 130
STRUCTURES WITH OPEN GRATES
6" MIN. ORGANIC Buffalo, NY 14202
FILTER MEDIA 716-551-6281
NOTES: ELEVATED BYPASS MANIFOLD
1. CONTRACTOR SHALL INSTALL FILTER MEDIA AFTER SITE HAS BEEN STABILIZED TO labellapc.com
MINIMIZE POTENTIAL OF SEDIMENT CONTAMINATION OF MEDIA.
2. FILTER MEDIA SHALL BE LOAM/SAND MIX, NYSDOT BIO SOIL MIX ITEM #208.01030022,
CONTAINING A MINIMUM OF 85% TO 88% COARSE/MEDIUM SAND BY VOLUME, 8% TO 12%
24" MIN.
SOIL FINES, AND 3% TO 5% ORGANIC MATTER.
FILTER MEDIA 3. ORGANIC FILTER MEDIA SHALL MEET SAME CRITERIA AS ABOVE WITH THE EXCEPTION OF
CONTAINING 10% TO 12% ORGANIC MATTER.
4. SOIL SHOULD FALL WITHIN USCS TYPES SM OR ML WITH PERMEABILITY OF AT LEAST 1.0
FEET PER DAY. SOIL SHOULD BE FREE FROM STONES, STUMPS, ROOTS OR OTHER WOODY SUMP DEPTH TBD BY CATCH BASIN
MATERIAL OVER 1" IN DIAMETER. SITE DESIGN ENGINEER OR MANHOLE
(24" [600 mm] MIN RECOMMENDED)
5. PLACEMENT OF THE PLANTING SOIL SHOULD BE IN LIFTS OF 12" TO 18", LOOSELY
24" (600 mm) HDPE ACCESS PIPE REQUIRED ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN
6"-12" DRAINAGE COMPACTED TO AT MOST 80% PROCTOR TEST. PH RANGE: 5.2 - 7.00. USE FACTORY PARTIAL CUT END CAP PART #: FOUNDATION STONE AND CHAMBERS
GRAVEL JACKET 6. FILTER FABRIC TO BE NON-WOVEN CLASS 'C', MIRAFI 180-N OR APPROVED EQUIVALENT MC3500IEPP24BC OR MC3500IEPP24BW 8.25' (2.51 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
7. DRAINAGE GRAVEL TO MEET AASHTO M-43. NO.67, SIZE 0.25" TO 0.75"
8. CONTRACTOR TO PROVIDE PLANTING SOIL SUBMITTAL SPECIFICATION FOR REVIEW AND
FILTER FABRIC
APPROVAL PRIOR TO CONSTRUCTION.
9. WETLAND SEED MIX SHALL BE USED AS INDICATED IN SPECIFICATIONS. 7 MC-3500 ISOLATOR ROW PLUS DETAIL EXP: EXP:
4" PERFORATED PVC @ 0.2% SUBGRADE OR
10. CONTRACTOR SHALL PROVIDE AT LEAST TWO PERMEABILITY TESTS FOR EACH FACILITY C504 N.T.S.
EXISTING SOIL DRAINAGE GRAVEL
LOCATED AT OPPOSITE SIDES OF FACILITY.
8 BIORETENTION INSERTA TEE DETAIL UNDERDRAIN DETAIL CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
NTS NTS
C504 N.T.S. DO NOT INSTALL STORMTECH STORMTECH LAND SURVEYING: 0021271
INSERTA-TEE AT CHAMBERS STORMTECH CHAMBER GEOLOGICAL: 0021659
CHAMBER JOINTS END CAP
PROVIDE CAST IRON FRAME PROVIDE CAST IRON CLEANOUT THREADED PLUG IP THD OR BRASS A OUTLET MANIFOLD
AND COVER, SET FLUSH SCREW PLUG (HS 67). PVC PLUGS NOT ALLOWED. PROVIDE 1"-3" It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
WITH FINISH GRADE 10" CLEARANCE BETWEEN PLUG & UNDERSIDE OF COVER CONVEYANCE PIPE Sec. 7307, for any person, unless acting under the direction of a licensed
MATERIAL MAY VARY architect, professional engineer, or land surveyor, to alter an item in any
GRADE (PVC, HDPE, ETC.)
FOUNDATION STONE way. If an item bearing the seal of an architect, engineer, or land surveyor
FINISH GRADE FOR UNPAVED AREAS BENEATH CHAMBERS is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
7 1/2"
WITHOUT FRAME AND COVER
1"
date of such alteration, and a specific description of the alteration.
A
ADS GEOSYNTHETICS 601T
17" INSERTA TEE SECTION A-A
CONNECTION
INSERTA TEE TO BE NON-WOVEN GEOTEXTILE DUAL WALL © 2024
2026 LaBella Associates
COMPACTED FILL TAMPED IN 6" INSTALLED, CENTERED PERFORATED
(X)
LAYERS OVER CORRUGATION HDPE
STORMTECH UNDERDRAIN
STORM SECTION A-A SIDE VIEW END CAP
DWV PVC FEMALE ADAPTER, IP PLACE ADSPLUS WOVEN GEOTEXTILE
THREAD x SOCKET (CENTERED ON INSERTA-TEE INLET) OVER
C.O.
BEDDING STONE FOR SCOUR PROTECTION AT
6" RISER: SDR-35 PVC (ASTM D-2241)
WITH SOLVENT WELDED JOINTS LETTERING ON COVER
SIDE INLET CONNECTIONS. GEOTEXTILE MUST
EXTEND 6" (150 mm) PAST CHAMBER FOOT CHAMBER
MAX DIAMETER OF
INSERTA TEE
HEIGHT FROM BASE
OF CHAMBER (X)
B B
HOME LEASING
FOUNDATION STONE
PROVIDE SDR-35 GASKETED NOTES: SC-310 6" (150 mm) 4" (100 mm)
A BENEATH CHAMBERS
75 S CLINTON AVE SUITE 700,
FITTINGS AS NECESSARY; 1/8TH SC-800 10" (250 mm) 4" (100 mm) ROCHESTER, NEW YORK 14604
6" x 6" x 6" SDR-35 TRUE 45 DEGREE BEND, OR TWO 1/16TH BENDS 1. FRAME AND COVER TO BE USED DC-780 10" (250 mm) 4" (100 mm)
NOTES:
ONLY IN PAVED AREAS. ADS GEOSYNTHETICS 601T
WYE WITH BENDS AS NECESSARY COMPACTED CRUSHED STONE FILL · PART NUMBERS WILL VARY BASED ON INLET PIPE MC-3500 12" (300 mm) 6" (150 mm)
A NON-WOVEN GEOTEXTILE
MATERIALS. CONTACT STORMTECH FOR MORE
6" MIN. 6" MIN. DEPTH = 1/2 OD + 12" MIN. 2. CRUSHED STONE: NO. 1 WASHED MC-4500 12" (300 mm) 8" (200 mm)
INFORMATION.
STONE OR A MIX OF NO. 1 AND · CONTACT ADS ENGINEERING SERVICES IF INSERTA TEE MC-7200 12" (300 mm) 8" (200 mm) NUMBER AND SIZE OF UNDERDRAINS PER SITE DESIGN ENGINEER
4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS SECTION B-B
NO. 2 WASHED STONE INLET MUST BE RAISED AS NOT ALL INVERTS ARE INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS
POSSIBLE. 6" (150 mm) TYP FOR SC-800, DC-780, MC-3500, MC-4500 & MC-7200 SYSTEMS
RECOMMENDED METHODS FOR JOINING OF GASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRON
SOLVENT WELD PIPE:
SELECT SELECT
GRANULAR
FILL
GRANULAR
FILL
1. CLEAN DRY HUBS & SPIGOTS
5 MC-3500 INSERTA-TEE INLET 4 MC-3500 UNDERDRAIN
2. APPLY PRIMER TO PARTS BEING C504 N.T.S. C504 N.T.S.
CONNECTED
3. APPLY PVC SOLVENT WELD CEMENT
FLOW DIRECTLY OVER PRIMER
** PVC TYPE IS COMPATIBLE FOR SOLVENT
WELDING TO SDR-35 OR ANY OTHER PVC TYPE I ACCEPTABLE FILL MATERIALS: STORMTECH MC-3500 CHAMBER SYSTEMS
PIPE MADE TO STEEL PIPE OUTSIDE DIMENSIONS
MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT
FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE
6" SDR-35 PVC (ASTM D2241) UNDISTURBED EARTH CRUSHED STONE BEDDING 6" SDR-35 PVC (ASTM D2241) PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED
TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S
SERVICE LATERAL WITH PUSH ON D N/A INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND
SERVICE LATERAL WITH PUSH ON DEPTH=1/2 OD +6" PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.
PREPARATION REQUIREMENTS.
NEOPRENE RUBBER GASKETS NEOPRENE RUBBER GASKETS PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER
6 CLEANOUT FOR NEW STORM LATERAL INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE
GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35%
AASHTO M145¹
A-1, A-2-4, A-3 BEGIN COMPACTIONS AFTER 18" (450 mm) OF MATERIAL OVER
FINES OR PROCESSED AGGREGATE. THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS
C504 N.T.S. C
TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 18" (450 mm)
ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT
MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF
OR IN 12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY
FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY
WEST SENECA APARTMENTS
SUBBASE MAY BE A PART OF THE 'C' LAYER. AASHTO M43¹
THIS LAYER.
3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10
FOR PROCESSED AGGREGATE MATERIALS. 2544 CLINTON ST,
FRAME & GRATE: EJ CASTINGS WEST SENECA, NY 14224
NO. 4 BARS, 4 EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS
RETICULINE GRATE, H-20 LOAD RATED, CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5
AASHTO M43¹
GRASS CONCRETE B FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER NO COMPACTION REQUIRED
BICYCLE PROOF, ADA-COMPATIBLE SIDES (TYP.) 3, 357, 4, 467, 5, 56, 57
ABOVE.
ASPHALT
4,000 PSI CONCRETE POURED IN PLACE FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE AASHTO M43¹
CL SUCH THAT RIM WILL MEET FINISH GRADE. A CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3
SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. 3, 357, 4, 467, 5, 56, 57
PLEASE NOTE:
TOPSOIL 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".
REFER TO ASPHALT 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.
SOILTIGHT ADAPTER PAVEMENT DETAILS 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR
4" MIN
COMPACTION REQUIREMENTS.
SELECT EARTH
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
4. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.
5. WHERE RECYCLED CONCRETE AGGREGATE IS USED IN LAYERS 'A' OR 'B' THE MATERIAL SHOULD ALSO MEET THE ACCEPTABILITY CRITERIA OUTLINED IN TECHNICAL NOTE 6.20 "RECYCLED CONCRETE STRUCTURAL BACKFILL".
ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL NO: DATE: DESCRIPTION:
AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS
TYPE 1 OR 2 SUBBASE PAVEMENT LAYER (DESIGNED Revisions
BY SITE DESIGN ENGINEER)
2" DEEP x 2" WIDE
XX" STANDARD H-20 GRATE CONSTRUCTION JOINT MINIMUM COVER ELEVATION: XX
EXPOXY GROUT 100% 6"
PLAN SOLIDS (TYP.) 30" SQUARE
TYP. ALL WALLS D *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED
8'
PROJECT NUMBER:
PERIMETER STONE
C
INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,
INCREASE COVER TO 24" (600 mm). 18" (450 mm) (2.4 m) 2241067
CONNECT UNDERDRAIN WHERE SHOWN (SEE NOTE 4) MIN* MAX
OR PROVIDE (2) 10 FOOT STUBS OF 12" (300 mm) MIN
TOP CHAMBER ELEVATION: XX DRAWN BY:
PERFORATED PVC, OPPOSITE SIDES. B
100 YEAR PEAK ELEVATION: XX EMM / SCB
PRECAST SECTION ASTM C-478 EXCAVATION WALL
(CAN BE SLOPED OR VERTICAL)
REVIEWED BY:
MEETING HS-20 LOADING 45" 10 YEAR PEAK ELEVATION: XX SRV / DPB
(1143 mm)
XX" DRAIN BASIN ISSUED FOR:
SEE PLAN
VARIES
BASE CHAMBER ELEVATION: XX SITE PLAN APPROVAL
A 1 YEAR PEAK ELEVATION: 1069.54 BASE STONE ELEVATION: XX
6" MIN.
9" (230 mm) MIN DATE:
(SEE NOTE 3) 4/20/2026
2.5' SEPARATION
6" (150 mm) MIN
SEE PLAN FOR DIAMETER MC-3500 6"
77" (1956 mm) 12" (300 mm) MIN
END CAP SUBGRADE SOILS (150 mm) MIN DRAWING NAME:
(SEE NOTE 3) **THIS CROSS SECTION DETAIL REPRESENTS
MINIMUM REQUIREMENTS FOR INSTALLATION.
GROUNDWATER ELEVATION: XX
6" MIN. STONE BEDDING
ALL CONCRETE
NOTES: PLEASE SEE THE LAYOUT SHEET(S) FOR
TO LIMITS OF EXCAVATION. PROJECT SPECIFIC REQUIREMENTS.
TO BE 4,000 PSI 1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS"
SAME MATERIAL USED
CHAMBER CLASSIFICATION 45x76 DESIGNATION SS.
6" MIN.
FOR SEWERS.
SOILTIGHT ADAPTER 2. MC-3500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
NOTES:
3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION
FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. REFERENCE STORMTECH DESIGN MANUAL FOR BEARING CAPACITY GUIDANCE.
CONSTRUCTION DETAILS
6" STONE BASE
4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.
1. THE ENTIRE EXTERIOR & INTERIOR SURFACES OF THE CATCH BASIN SHALL BE PAINTED WITH TWO COATS OF 5. REQUIREMENTS FOR HANDLING AND INSTALLATION:
BITUMASTIC COATING. · TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.
2. CATCH BASIN SHALL NOT BE CONNECTED TO ANY SANITARY SEWER. · TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3” (75 mm).
3. PROVIDE FRAMES AND GRATES CONFORMING TO NYSDOT STANDARD SHEETS M655-10R3, M655-6. · TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 500 LBS/FT/%.
SECTION 4. FRAMES TO HAVE APPROPRIATE STRAP ANCHORS. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS.
DRAWING NUMBER:
3 DRAIN BASIN 2 CATCH BASIN 1 MC-3500 CROSS SECTION
4/20/2026 1:17:45 PM
C504 N.T.S. C504 N.T.S. C504 N.T.S.
C504
Page 35 of 1174
Page 36
NOT FOR CONSTRUCTION
STANDARD C.I. MANHOLE FRAME & COVER.
SEE SPECIFICATIONS FOR COVER TYPE OPENING SHALL BE CORED & FILLED WITH EPOXY
MORTER SIKADUR 33 BY SIKE OR FLEXOLITH GEL
15" MAX. GRADE RINGS AS NECESSARY BY DURAL TO MAKE WATERTIGHT CONNECTION.
PRECAST OPENINGS ARE ALSO ALLOWED.
24" I.D. PRECAST REINFORCED CONCRETE PROVIDE FLEXIBLE WATERTIGHT CONNECTION.
WITH ECCENTRIC OPENING WILL BE GASKET SHALL MEET ASTM C-923
REQUIRED FOR MANHOLE WITH A 300 Pearl Street, Suite 130
12" MAX. DEPTH GREATER THAN 6'-0" FINISHED GRADE REMOVABLE CAST IRON COVER
LABEL "WATER" (PAINT BLUE)
Buffalo, NY 14202
TAPERED TOP 716-551-6281
ASTM C-748
labellapc.com
SEE NOTE 2 PRECAST REINFORCED CONC.
MANHOLE SECTION 2' 2-PIECE ADJUSTABLE
THROUGH 8' LENGTHS AS CAST IRON VALVE BOX
MINIMUM COVER
STEPS 12" O.C.
REQUIRED WITH A 4" HIGH MAX.
(SEE NOTE 5)
CAST IN PLACE .
TOP SECTION (ASTM C-478) " I.D STONE FULL WIDTH OF
24
COAT INTERIOR AND EXTERIOR TRENCH AROUND
WITH 2 COATS SIKAGARD 62, VALVE BOX
DURALKOTE 312 OR
GATE VALVE
APPROVED EQUIVALENT.
RUBBER GASKETS 12" MIN. WATER MAIN
(ASTM C-443) RETAINER GLAND
(SEE NOTE 6)
15" MAX.
EXP: EXP:
.
I.D
PIPE BEDDING CERTIFICATE OF AUTHORIZATION NUMBER:
3" MIN.
PLAN PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
8" MIN.
COMPACTED SELECT MINIMUM MANHOLE DIAMETERS UNDISTURBED EARTH SOLID CONCRETE BLOCK (MIN.
GEOLOGICAL: 0021659
GRANULAR FILL PIPE DIAMETERS 4" x 8" x 16") 1 REQUIRED AT
# OF NOTES: DIP WATER MAIN
CONNECTIONS 8" 10" 12" 15" 16" 18" 21" 24" 30" 36" 42" & UP It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
5,000 PSI CONCRETE 6" CRUSHER RUN SUBBASE COURSE, 1. VALVE BOXES SHALL BE CENTERED ON VALVE AND SET ON COMPACTED BACKFILL.
UNDISTURBED Sec. 7307, for any person, unless acting under the direction of a licensed
NYSDOT ITEM 304 TYPE 2 SOIL OR ROCK ONE 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' 2. VALVE SHALL NOT SUPPORT VALVE BOX. architect, professional engineer, or land surveyor, to alter an item in any
NOTE: 3. BODY AND BONNET BOLTS SHALL BE STAINLESS STEEL. way. If an item bearing the seal of an architect, engineer, or land surveyor
ELEVATION TWO 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' REQUIRES
4. VALVES SHALL BE OPEN RIGHT. is altered; the altering architect, engineer, or land surveyor shall affix to
SPECIAL
1. PRECAST REINFORCED CONCRETE BASE REQUIRED FOR MANHOLE WITH DEPTH GREATER THAN 4' 4' 4' 4' 4' 4' 5' 5' 5' 5' MANHOLE 5. MINIMUM COVER SHALL BE AS SHOWN ON WATER MAIN TRENCH DETAIL. the item their seal and notation "altered by" followed by their signature and
THREE
6'-0". 6. RETAINER GLANDS NOT REQUIRED AT HYDRANT GUARD VALVES. GUARD VALVES SHALL BE date of such alteration, and a specific description of the alteration.
2. REFER TO TABLE FOUR 4' 4' 4' 5' 5' 5' 5' 5' 5' 5' RESTRAINED WITH ANCHOR PIPE.
3. MANHOLES ARE TO BE FLANGED AND WATER TIGHT IN HIGH WATER TABLE AREAS 7. REFER TO PLANS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
© 2024
2026 LaBella Associates
8 CONCENTRIC STORM MANHOLE 7 MJ GATE VALVE
C505 N.T.S. C505 N.T.S.
MINIMUM MANHOLE DIAMETERS
# OF
CONNECTIONS
PIPE DIAMETERS
HOME LEASING
8" 10" 12" 15" 16" 18" 21" 24" 30" 36" 42" & UP
75 S CLINTON AVE SUITE 700,
2" MIN.
ONE 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' ROCHESTER, NEW YORK 14604
TWO 4' 4' 4' 4' 4' 4' 4' 4' 5' 5' REQUIRES
SPECIAL
THREE 4' 4' 4' 4' 4' 4' 5' 5' 5' 5' MANHOLE
LETTERING FOUR 4' 4' 4' 5' 5' 5' 5' 5' 5' 5'
ON COVER
STANDARD CI MH FRAME & COVER W/ MORTAR LEVELING COURSE, IN WATERTIGHT CI MH FRAME & COVER, SET IN MORTAR 6 WATER QUALITY UNIT
PAVED AREAS WITH GROUND WATER LEVEL GREATER THAN 30" BELOW LEVELING COURSE, IN UNPAVED AREAS WITH GROUND
8" MIN THICK REINF. TOP C505 N.T.S. FINISHED GRADE
FINISHED GRADE. WATER LEVEL LESS THAN 30" BELOW FINISHED GRADE
SLAB WITH 24" DIA. (SANITARY ONLY)
OPENING, SEE NOTE 7
CONCRETE ADJUSTING RINGS WITH
MIN. COVER
FINISHED GRADE
SEE NOTE 3
BITUMASTIC COATING ON INTERIOR SURFACE
FINISHED GRADE PROPOSED OR
MAX.
PRECAST REINF. CONC. MH, ASTM C478, 2'
18"
EXISTING WATER
6' MIN. IN PAVEMENT
THRU 8' HEIGHT AS NECESSARY. 4' MAX PROPOSED OR MAIN
5' MIN. IN LAWN
HEIGHT FOR TOP SECTION. ECCENTRIC CONE PROVIDE WATERTIGHT CONNECTION. TRACER WIRE FOR EXISTING UTILITY
4" MAX. TOP SECTION NOT SHOWN, SEE NOTE 7 PRECAST USE PRECAST RUBBER GASKET. WATER SERVICE PIPE
MAX
RUBBER GASKETS AT JOINTS, (ASTM C443) OPENING
12"
BACKFILL WITH SELECT FILL 45° BEND
WITH BUTYL RESIN STRIP SEALANT, ASTM WYE BRANCH FOR DROPS OVER IN ROADWAY, SIDEWALK, AND
C990, ON INSIDE & OUTSIDE LEDGE BRICK OR PVC 4', TEE DROPS FOR UP TO 4' DRIVEWAY AREAS. USE NATIVE SEPARATION
CAP TO 1/2 ID D=
SOIL IN GRASS AREAS. COMPACT DISTANCE
6"
STEPS 12" O.C. COATING (SEE NOTE 8) PROVIDE VERTICAL
VERTICAL SEE TABLE CL IN A MAXIMUM OF 6" LIFTS. RESTRAINT IN
CL
ZONE
PIPE
CAST IN PLACE 30° BEND WHEN
ACCORDANCE WITH THE
WYE IS USED IN ROCK, BACKFILL PIPE
VERTICAL THRUST
WEST SENECA APARTMENTS
CENTERLINE OF MH
ZONE WITH SAND
BLOCK DETAILS (TYP.)
6"
SEE NOTE 2
VERT. DROP SAME SIZE 2544 CLINTON ST,
COMPACTED 1/2 ID WATER SERVICE
AS THE SEWER ENTERING WEST SENECA, NY 14224
SELECT
THE MH, 8" MIN. NOTES:
GRANULAR FILL CL
"DIM. A"
90° ELBOW CL
PROVIDE FLEXIBLE WATERTIGHT CONNECTION. 1. SEPARATION DISTANCE DIMENSION D, (OUTSIDE EDGE TO OUTSIDE EDGE) SHALL BE PROVIDED AS FOLLOWS:
GAS AND WATER LINES D = 12" MIN. SANITARY FORCEMAINS, STORM SEWERS, AND SANITARY SEWERS D = 18" MIN.
MIN.
GASKET SHALL MEET ASTM C-923 6" MIN. IN ROCK
6"
TRENCH LIMITS 2. ONE STANDARD FULL LENGTH OF WATER MAIN SHALL BE CENTERED UNDER THE SEWER SO THAT BOTH JOINTS WILL BE AS FAR FROM THE SEWER
MAX.
6" MIN. FORMED 12" MIN. IN SOIL
15"
NORMAL PIPE DIA + 24" AS POSSIBLE.
CONCRETE ENCASEMENT 3. MIN, COVER DEPTH - SEE WATER MAIN TRENCH DETAIL.
S
ID
L OF DROP, 3,000 PSI
PIPE BEDDING
5 WATER SERVICE TRENCH 4 TYPICAL WATER MAIN VERTICAL TRANSITION
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
12" MIN.
C505 N.T.S. C505 N.T.S. AT EXISTING PAVEMENT:
INITIAL SAWCUT TYPICAL
UNDISTURBED
3" MIN.
NO: DATE: DESCRIPTION:
MIN.
12" MIN. CRUSHED STONE: EXTEND MIN. 12" EACH SIDE OF TRENCH.
8"
UNDISTURBED GROUND
SUBBASE BEYOND EXTERIOR EDGES OF STRUCTURE EXISTING OR (SEE PAVEMENT JOINT DETAIL Revisions
GROUND 5.5' BURY HYDRANT TO BE
COURSE 4,000 PSI CONC. BENCH. SLOPE PROPOSED SURFACE FOR PAVEMENT RESTORATION)
PROVIDE DROP WHERE DIM. "A" IS EQUAL TO OR GREATER THAN 2' INSTALLED W/ 4-1/2" NOZZLE
TOP OF BENCH @ 1/2"/FT. MIN. FACING THE ROADWAY
SECTION A-A TO DRAIN
FOR SANITARY SEWERS, OR EQUAL TO OR GREATER THAN 5' FOR
STORM SEWERS, UNLESS NOTED OTHERWISE ON PLANS. PROJECT NUMBER:
SECTION A-A GRADE 2241067
(FOR OUTSIDE DROP CONNECTION & WATERTIGHT MH FRAME & COVER) DRAWN BY:
FOR SURFACE RESTORATION
REFER TO ADDITIONAL DETAILS
EMM / SCB
NOTES: VALVE BOX
REVIEWED BY:
12" MIN SRV / DPB
1. IF AN INVERT IS NOT GIVEN, THE CROWN OF THE INFLUENT SEWER(S) SHOULD BE AT THE TRENCH BACKFILL MATERIAL
RADIUS NOT SAME LEVEL OR ABOVE THE CROWN OF THE OUTLET SEWER. EXTENSION ISSUED FOR:
LESS
-ROADWAY SIDEWALK AND ALL DRIVEWAY
SITE PLAN APPROVAL
THAN 1/2 MH ID 2. PIPE CONNECTIONS 6" DIAMETER AND SMALLER MAY BE FIELD CORED. CORED OPENINGS IN SAFE OPERATION
MANHOLE RISER SECTIONS SHALL BE NOT LESS THAN 6" FROM A RISER JOINT. SHEET PILING AREAS: SELECT GRANULAR FILL.
WARNING DATE:
A A (AS REQUIRED) TAPE
3. ALL RISER JOINTS SHALL BE RUBBER RING GASKETS CONFORMING TO ASTM C443 WITH -NON PAVED AREAS: 4/20/2026
FLEXIBLE JOINT SEALER ON OUTSIDE OF JOINTS. BASE SHALL BE COMMON EARTH BACKFILL
#1 WASHED STONE FOR DRAWING NAME:
4. PRECAST BASES, RISER SECTIONS & TOP SLABS SHALL CONFORM WITH ASTM C478, W/ WIDTH OF HYDRANT TRENCH
FLOW
A
HS-20 LOADING AND 30% IMPACT LOADING DESIGN.
NEW FLEXIBLE CONNECTOR
NOTE:
PIPE ZONE
COUPLING PVC x APPLICABLE PIPE BEDDING MATERIAL:
SHAPED 5. CONCRETE FOR STRUCTURE SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF SOLID CONCRETE BLOCK
EXISTING MATERIAL AS 4,000 PSI. (MIN.: 8"x8"x16")
PIPE
O.D.
INVERT NYSDOT 703-0201 50-50 BEDDING AND BACKFILL MATERIAL
NECESSARY WITH STAINLESS WATER MAIN
MIXTURE OF PRIMARY INSTALLED & COMPACTED IN
MAX.
6. INVERT AND BENCH MAY BE CONSTRUCTED WITH BRICK OR POURED CONCRETE. PVC
2'-0"
STEEL SHEAR BAND MAXIMUM 6" LIFTS.
AND/OR ABS PIPE SHALL NOT BE USED WITHIN THE MANHOLE. SIZE 1 & 2
CONSTRUCTION DETAILS
B
7. ECCENTRIC CONE TYPE TOP SECTIONS FOR MANHOLES SHALL BE USED WHERE THE INSIDE IN ROCK, BACKFILL PIPE PIPE DIA. DIM. A DIM. B
SOLID CONCRETE BLOCK 6"x18" (MIN.) ANCHOR PIPE
HEIGHT DIMENSION FROM THE BENCH WALL TO THE BOTTOM OF THE ECCENTRIC SECTION MJ ANCHOR TEE, 6" OUTLET ZONE WITH SAND A A
EXCEEDS 8', OTHERWISE PROVIDE FLAT SLAB TOP SECTIONS. (MIN.: 4"x4"x8") UP TO 18" 1'-0" (MIN.) 6"
EXISTING RCP, CIP 6" MJ GATE VALVE 6" MIN. PIPE 6" MIN.
OR VTP TO REMAIN 8. INSIDE AND OUTSIDE OF MANHOLE TO BE EPOXY COATED TO ONE FOOT ABOVE THE HIGHEST NOTES: IN ROCK O.D. IN ROCK 19" TO 36" 1'-6" (MIN.) 9"
PIPE CROWN. AREAS OUTSIDE OF ONE FOOT ABOVE HIGHEST PIPE CROWN TO RECEIVE TWO
COATS OF BITUMASTIC COATING ON BOTH THE INSIDE AND OUTSIDE OF MANHOLE. 1. HYDRANT TO BE MUELLER SUPER CENTURION 250 - MODEL A-423 OR APPROVED EQUAL. OVER 36" 2'-0" (MIN.) 12"
2. HYDRANT TO BE PAINTED RED.
3. HYDRANT MAIN VALVE SEAT SHALL BE 4 1/2" IN DIAMETER. DRAWING NUMBER:
4. HYDRANT VALVE TO TURN LEFT.
SANITARY MANHOLE HYDRANT ASSEMBLY STORM/SANITARY SEWER TRENCH AND PIPE BEDDING
4/20/2026 1:17:28 PM
3 2 1
C505 N.T.S. C505 N.T.S. C505 N.T.S.
C505
Page 36 of 1174
Page 37
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
VALVE BOX COVER SHALL 716-551-6281
BE LABELED "WATER"
FINISHED GRADE
labellapc.com
ROW
CURB STOP
TRACER WIRE RAN UP
OUTSIDE OF BOX, AS
REQUIRED
THREE PIECE CAST IRON
VALVE BOX
APPROVED BACKFILL
EXP: EXP:
MATERIAL
TAP VALVE (FLxMJ)
FUTURE CURB BOX CERTIFICATE OF AUTHORIZATION NUMBER:
5'-0" MIN.
TAPPING SLEEVE PROFESSIONAL ENGINEERING: 0021272
APPROVED BEDDING LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
MATERIAL
FUTURE CONNECTION TO
SOLID CONCRETE
EXISTING SERVICE WITH
BLOCKS (TYP.)
CURB STOP SUPPORTED It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
BY A SOLID CONCRETE Sec. 7307, for any person, unless acting under the direction of a licensed
BLOCK (4"x8"x8") architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
3
4", 1", OR 2" TYPE 'K'
COPPER TUBING © 2024
2026 LaBella Associates
CORPORATION STOP
UNDISTURBED EARTH WATERMAIN
NEW WATERMAIN
SOLID CONCRETE BLOCK
(4"x8"x16") WITH SOLID CONCRETE BLOCK
HARDWOOD SHIMS (4"x8"x16") WITH
HARDWOOD SHIMS
HOME LEASING
NOTES: 75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
1. VALVE SHALL NOT SUPPORT VALVE BOX.
NOTES:
2. TAP VALVE SHALL BE INSTALLED LEVEL AND VERTICALLY PLUMB.
1. AFTER COMPLETION OF TESTING, THE SAMPLE POINT SHALL BE UTILIZED FOR A SERVICE CONNECTION. IF UNABLE TO UTILIZE FOR A SERVICE
REPLACE THE CORPORATION STOP IN PIPE WITH A THREADED BRASS PLUG. 3. VALVE BOX SHALL BE PLUMB TO GRADE, WITH OPERATING NUT CENTERED IN BOX.
5 TEMPORARY BLOW-OFF / SAMPLE POINT 4 TAPPING SLEEVE AND VALVE
C506 ECWA STANDARD DETAIL C506 ECWA STANDARD DETAIL
B B B TRENCH UNDER OR WITHIN 5'-0" OF
ASPHALT OR CONCRETE PAVEMENT,
TRENCH UNDER OTHER AREA DRIVEWAY, SIDEWALK OR PARKING LOT
TRENCH UNDER OR WITHIN 5'-0" OF
ASPHALT OR CONCRETE PAVEMENT, PAYMENT LIMIT
A
A
A
TRENCH UNDER OTHER AREA DRIVEWAY, SIDEWALK OR PARKING LOT FOR ASPHALT
AND CONCRETE
1'-0" RESTORATION
TYP.
WEST SENECA APARTMENTS
A
A
A
PAYMENT LIMIT FOR
EXISTING GRADE ROCK EXCAVATION
INITIAL SAW CUT
2544 CLINTON ST,
AND SELECT FILL 1'-0"
PLAN PLAN PLAN WEST SENECA, NY 14224
FINAL SAW CUT
SOLID CONCRETE SOLID CONCRETE
SOLID CONCRETE EXISTING GRADE EXISTING PAVEMENT
BLOCK (TYP.) BLOCK (TYP.)
BLOCK (TYP.)
C
C
C
4'-0" MIN. COVER (PIPE ≥16")
5'-0" MIN. COVER (PIPE <16")
C
C
C
1'-6" CLEARANCE BETWEEN EXISTING SUITABLE EXCAVATED
UTILITY AND TOP OF WATERMAIN / CASING BACKFILL (PROPERLY
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
(INCREASE TO 3'-0" WHEN CROSSING STORM SELECT BACKFILL COMPACTED) DETECTABLE TAPE IN TRENCH 1'-6"
PROFILE PROFILE PROFILE SEWERS >36") (COMPACTED IN 6" LIFTS) BELOW GRADE (CONNECTED TO
1'-0" (PIPE <16") VALVE BOXES) NO: DATE: DESCRIPTION:
DEAD END HORIZONTAL BEND TEE PIPE BEDDING 2'-0" (PIPE ≥16")
Revisions
TYP. SELECT BACKFILL
(COMPACTED IN 6" LIFTS)
6"
PROJECT NUMBER:
2241067
H
6"
TRACER WIRE (NON-METALLIC PIPE), TAPED
AT 5'-0" INCREMENTS TO THE CROWN OF DRAWN BY:
EMM / SCB
6"
PIPE (CONNECTED TO VALVE BOXES)
WATERMAIN REVIEWED BY:
PLAN SRV / DPB
EPOXY COATED #5 PIPE BEDDING
6"
ISSUED FOR:
REBAR (TYP.) UNDISTURBED EARTH OR
ROCK TRENCH BOTTOM
SITE PLAN APPROVAL
WATERMAIN
DATE:
4/20/2026
D
UNDISTURBED EARTH OR
12" ROCK TRENCH BOTTOM
DRAWING NAME:
W
NOTES: 2" RIGID INSULATION BOARD, PLACED
ON TOP AND EACH SIDE
PROFILE 1. ALL EXISTING UTILITIES MUST BE SUPPORTED WITH APPROPRIATE CHAINS / STRAPS DURING CONSTRUCTION OF THE NEW WATERMAIN.
CONTRACTOR IS REQUIRED TO COORDINATE WITH THE OWNER FOR THEIR PREFERRED SUPPORT REQUIREMENTS.
2'
VERTICAL BEND 2. WHEN CROSSING A SEWER LINE WITH NEW WATERMAIN (AND WITHOUT A CASING PIPE), ONE FULL LENGTH (18'-0" MIN.) SHALL BE USED AT CONSTRUCTION DETAILS
W THE POINT OF CROSSING. THE WATERMAIN SHALL BE PLACED SO THAT BOTH JOINT ENDS ARE AS FAR AS POSSIBLE FROM THE EXISTING
NOTE: SEWER. FROST PROTECTION TRENCH
(COVER <4'-0")
FULL CONCRETE THRUST BLOCKS AS SHOWN ARE REQUIRED WHEN THRUST 3. IF CASING PIPE IS USED, IT SHALL EXTEND 5'-0" BEYOND THE EXISTING PIPE OUTER EDGE IN EACH DIRECTION, AND NO WATERMAIN JOINTS ECWA APPROVAL REQUIRED
RESTRAINT IS NOT PROVIDED BY OTHER MEANS SUCH AS MJ RESTRAINTS *LENGTHS SHOWN ARE MINIMUM REQUIREMENTS OR FITTINGS SHALL BE LOCATED WITHIN 4'-0" FROM THE CASING PIPE EDGE.
DRAWING NUMBER:
3 THRUST BLOCKS 2 PIPE CROSSING DETAIL 1 TYPICAL TRENCH DETAIL
4/20/2026 1:17:25 PM
C506 ECWA STANDARD DETAIL C506 ECWA STANDARD DETAIL C506 ECWA STANDARD DETAIL
C506
Page 37 of 1174
Page 38
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2024
2026 LaBella Associates
HOME LEASING
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
4 STANDARD FRAME AND COVER DETAIL 3 CLEANOUT IN PAVEMENT/SIDEWALK DETAIL
C507 ERIE COUNTY SEWER STANDARD DETAIL C507 ERIE COUNTY SEWER STANDARD DETAIL
WEST SENECA APARTMENTS
2544 CLINTON ST,
WEST SENECA, NY 14224
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
NO: DATE: DESCRIPTION:
Revisions
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / SCB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
CONSTRUCTION DETAILS
DRAWING NUMBER:
4/20/2026 1:17:17 PM
2 CLEANOUT DETAIL FOR SERVICE CONNECTION 1 TYPICAL COMMERCIAL SERVICE WITHOUT BASEMENT DETAIL
C507 ERIE COUNTY SEWER STANDARD DETAIL C507 ERIE COUNTY SEWER STANDARD DETAIL
C507
Page 38 of 1174
Page 39
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2024
2026 LaBella Associates
HOME LEASING
75 S CLINTON AVE SUITE 700,
ROCHESTER, NEW YORK 14604
WEST SENECA APARTMENTS
2544 CLINTON ST,
WEST SENECA, NY 14224
FURNISH AND INSTALL IN LINE FUSES.
BUSSMAN "TRON" WEATHERPROOF FUSES NO: DATE: DESCRIPTION:
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
GASKETED HAND HOLE HOLDERS #HEB-AD WITH "LP-CC" TIME DELAY Revisions
FUSES FOR EACH LUMINAIRE
VARIES - CONCRETE BASE TO BE INSTALLED FLUSH WITH PROJECT NUMBER:
3 PARKING LOT STEEL POLE (MC-01 POLE) FINISHED GRADE OR UP TO 36" EXPOSED. REFER TO SITE
LIGHTING SUMMARY ON UTILITY PLAN(S)
2241067
C508 N.T.S. 36" DRAWN BY:
MAX EMM / SCB
FINISHED GRADE REVIEWED BY:
SRV / DPB
GALVANIZED STEEL 'J' BOLTS (TYP. OF 4) ISSUED FOR:
3" MIN SITE PLAN APPROVAL
COVER
1" PVC SCHEDULE 80 CONDUIT DATE:
24" MIN
(TYP. OF 2) 4/20/2026
66" MIN
DRAWING NAME:
#6 CU GROUND WIRE 3/4" PVC SCHEDULE 80 CONDUIT FOR GROUND
ROD. CONNECTION AS REQUIRED.
EXOTHERMIC WELD
6#6 VERTICAL RODS AND
#3 TIES @ 12" O.C.
1/2"Øx8' CU DRIVEN
24"Ø CONSTRUCTION DETAILS
GROUND ROD.
PVC CONDUIT FITTING
DRAWING NUMBER:
2 TYPICAL SITE LIGHTING POLE BASE DETAIL 1 LIGHTING FIXTURES / PHOTO METRICS
4/20/2026 1:17:42 PM
C508 N.T.S. C508 N.T.S.
C508
Page 39 of 1174
Page 40
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
EXP: EXP:
WOVEN TREE STAKING MATERIAL (DEEPROOT ARBORTIE OR
APPROVED EQUAL, TWO TIES PER TREE, SPREAD 180° APART).
LOCATE 6" FROM TOP OF STAKE UP TO LOWEST BRANCHES.
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
TWO 3" DIAMETER X 8' CEDAR STAKE
ABOVE GROUND TO LOWEST BRANCHES GEOLOGICAL: 0021659
GROUND LINE TO BE SAME AS AT THE
1 NURSERY
2 ROOT BALL DIAMETER
GROUND LINE TO BE THE SAME AS AT THE NURSERY. It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
REMOVE ALL TWINE & STRAPS. CUT AND REMOVE TOP 1/3 OF Sec. 7307, for any person, unless acting under the direction of a licensed
BURLAP. WIRE CAGE AND ALL SYNTHETIC MATERIALS SHALL PRUNE ONLY DEAD, BROKEN OR
architect, professional engineer, or land surveyor, to alter an item in any
BE TOTALLY REMOVED. DAMAGED BRANCHES
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
SET TOP OF ROOT BALL FLUSH TO GRADE 3" SHREDDED HARDWOOD MULCH - EXTEND date of such alteration, and a specific description of the alteration.
OVER SAUCER BERM
3" DEPTH SHREDDED HARDWOOD MULCH; KEEP
6" FROM TRUNK OF TREE TO MAINTAIN A VISIBLE ROOT CONSTRUCT EARTH SAUCER WITH 4" HIGH
FLARE. BERM © 2024
2026 LaBella Associates
CONSTRUCT EARTH SAUCER WITH 4" HIGH BERM-FLOOD
WITH WATER TWICE IN FIRST 24 HRS. REMOVE ALL TWINE & STRAPS. CUT AND REMOVE BURLAP
~
AND WIRE BASKET FROM TOP 1/3 OF ROOTBALL. REMOVE
ALL SYNTHETIC MATERIALS AND TAGS.
BREAK UP OR LOOSEN
6"
MIN
BACKFILL WITH PLANTING SOIL MIXTURE IN 9"
HOME LEASING
SUBSOIL LAYERS. WATER EACH LAYER UNTIL SETTLED. DO 75 S CLINTON AVE SUITE 700,
BACKFILL WITH PLANTING SOIL MIXTURE
2X ROOT BALL DIAMETER
IN 9" LAYERS. WATER EACH LAYER UNTIL SETTLED. DO NOTE: NOT TAMP. ROCHESTER, NEW YORK 14604
NOT TAMP. 1. PROVIDE A CONTINUOUS MULCHED PLANTING BED FOR
NOTE: ALL SHRUB PLANTINGS.
1. REMOVE STAKES AND GUYS AT THE END OF BREAK UP OR LOOSEN SUBSOIL WITH A PICK 2. DO NOT OVERSEED SHRUBS IN PLANTING BEDS OR
THE FIRST GROWING SEASON AFTER PLANTING PITS IN MAINTAINED LAWN AREAS
2. PROVIDE A 6' DIA. MULCHED PLANTING BED AROUND EACH TREE.
3. DO NOT OVERSEED TREE PLANTING PITS IN MAINTAINED LAWN AREAS.
DECIDUOUS TREE PLANTING 3 SHRUB PLANTING
4
L501 N.T.S.
L501 N.T.S.
2" DEPTH MULCH
WEST SENECA APARTMENTS
2544 CLINTON ST,
WOVEN TREE STAKING MATERIAL (DEEPROOT WEST SENECA, NY 14224
SUBSOIL TO BE 18" DEEP BED OF PLANTING
ARBORTIE OR APPROVED EQUAL)
BROKEN WITH SOIL MIXTURE
A PICK AXE
3" DIAMETER X 8' CEDAR OR
PRESSURE TREATED STAKE, TWO NOTE: GROUND COVERS SHALL BE POT OR CONTAINER GROWN.
OPPOSITE.
SET TOP OF ROOT BALL FLUSH TO GROUNDCOVER SECTION
GRADE
GROUND LINE TO BE THE SAME AS
AT THE NURSERY. REMOVE ALL PLANTS SHALL BE SET AT THE
TWINE & STRAPS. CUT AND REMOVE 2" DEPTH MULCH;
SAME GROUND LINE AS IN THE
TOP 1/3 OF BURLAP. WIRE CAGE AND ALL SYNTHETIC DO NOT MOUND
CONTAINER
MATERIALS SHALL BE TOTALLY REMOVED. MULCH OVER ROOT
NO: DATE: DESCRIPTION:
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C500 CONSTRUCTION DETAILS.dwg
COLLAR
PLANTING SOIL FIRM SOIL AROUND Revisions
3" MIN. SHREDDED HARDWOOD MULCH - ROOT BALL WITH HANDS
KEEP 6" FROM TRUNK OF TREE, TO MAINTAIN VISIBLE MIXTURE
ROOT FLARE
PROJECT NUMBER:
SUBSOIL
2241067
DRAWN BY:
CONSTRUCT EARTH SAUCER WITH 4" HIGH EMM / SCB
BERM-FLOOD WITH WATER TWICE IN FIRST 24 PERENNIAL SECTION
HRS. REVIEWED BY:
SRV / DPB
BACKFILL WITH PLANTING SOIL MIXTURE IN 9" LAYERS.
WATER EACH LAYER UNTIL SETTLED. DO NOT TAMP. NOTES: ISSUED FOR:
1. PROVIDE 18" DEPTH PLANTING SOIL MIX , ADD SITE PLAN APPROVAL
BREAK SUBSOIL WITH A PICK FERTILIZER WHEN MIXING. DO NOT COMPACT AFTER PLANTING.
2X ROOT BALL DIA.
2. WATER THOROUGHLY AFTER PLANTING. DATE:
4/20/2026
3. PROVIDE WELL DRAINING SUBSOIL WHEN SOIL IS HEAVY
NOTE: OR COMPACTED. DRAWING NAME:
1. REMOVE STAKES AND GUYS AT THE END OF
4. PLANTS SHALL BE REMOVED FROM ALL CONTAINERS WHEN
THE FIRST GROWING SEASON AFTER PLANTING
PLANTED, UNLESS OTHERWISE STATED IN THE PLANT SCHEDULE.
2. PROVIDE A 6' DIA. MULCHED PLANTING BED AROUND EACH TREE.
3. DO NOT OVERSEED TREE PLANTING PITS IN MAINTAINED LAWN AREAS.
EVERGREEN TREE PLANTING PERENNIAL - GROUNDCOVER PLANTING
2 1 LANDSCAPE DETAILS
L501 N.T.S. L501 N.T.S.
DRAWING NUMBER:
4/20/2026 1:17:53 PM
L501
Page 40 of 1174
Page 41
FIBER CEMENT PANEL - BRICK -
HARDIE "COBBLESTONE" WATSONTOWN "ELK"
FIBER CEMENT BOARD
AND BATTEN -
HARDIE "IRON GRAY"
ALTERNATE MATERIAL: ALTERNATE MATERIAL:
FIBER CEMENT SIDING FIBER CEMENT SIDING
- HARDIE "BOOTHBAY BLUE" - HARDIE "MONTEREY TAUPE"
VINYL SIDING - VYTEC VINYL SIDING - VTEC
PRESTIGE "LAKESHORE BLUE" PRESTIGE "SPRING MEADOW"
3D View and Material Palette
Home Leasing - West Seneca
Page 41 of 1174
Page 42
T.O. PARAPET E9 E3
+37' - 0" ELEVATION KEY NOTES
E8
T.O. ROOF NO. DESCRIPTION
+32' - 0" E1 MASONRY VENEER. COLOR AND PATTERN TBD.
E2 FIBER CEMENT PANEL SYSTEM. COLOR TBD
E11 E3 FIBER CEMENT BOARD AND BATTEN SYSTEM. COLOR TBD
LEVEL 3 VINYL LAP SIDING, 7" EXPOSURE. COLOR TBD. (ALTERNATE MATERIAL: FIBER CEMENT
E2 E4
+22' - 0" SIDING)
E5 ALUMINUM STOREFRONT SYSTEM. COLOR AND FINISH TBD.
E6 EXTERIOR WALL SCONCE. FIXTURE TBD.
LEVEL 2
E7 FRAMED CANOPY W/ GFRC CORNICE
+12' - 0" E7
E8 ROOF PARAPET W/ GFRC CORNICE
E4 E9 6" TRIM BOARD
E10 12" TRIM BOARD AND ALUMINUM PARAPET COPING
LEVEL 1
E11 VINYL DOUBLE HUNG WINDOW. COLOR AND TRIM TBD
+0' - 0"
E5 E1
EXTERIOR ELEVATION - WEST
4 1/16" = 1'-0"
T.O. PARAPET E9 E3 E8 E2 E10
+37' - 0"
T.O. ROOF
+32' - 0"
E11
LEVEL 3
+22' - 0"
LEVEL 2
+12' - 0"
E4
LEVEL 1
+0' - 0"
E4 E1 E4
3 EXTERIOR
1/16" = 1'-0"
ELEVATION - NORTH
T.O. PARAPET
E2 E9 E3 E8
+37' - 0"
T.O. ROOF
+32' - 0"
E11
LEVEL 3
+22' - 0"
E2
LEVEL 2
+12' - 0"
E4
LEVEL 1
+0' - 0"
E1 E4 E4 E1
EXTERIOR ELEVATION - EAST
2 1/16" = 1'-0"
T.O. PARAPET E3 E2 E8 E9 E1
+37' - 0"
T.O. ROOF
+32' - 0"
E11
LEVEL 3
+22' - 0"
LEVEL 2
E4
+12' - 0"
LEVEL 1
+0' - 0"
E4 E4 E7 E5 E6 E1
1 EXTERIOR
1/16" = 1'-0"
ELEVATION - SOUTH
Exterior Elevations
Home Leasing - West Seneca
Page 42 of 1174
Page 43
A-3
3
3 BR
UNIT
3 BR W D
UNIT
DEAD END
15' - 1"
W D
STAIR 2
190 SF
UP
3-STORY BLDG - UNIT COUNTS EXISTING MANSION - UNIT COUNTS
1 BR = 15 UNITS 1 BR = 9 UNITS
2 BR = 25 UNITS 2 BR = 4 UNIT
3 BR = 20 UNITS 3 BR = 2 UNITS
W D
MAINT. SHOP EQUIP STOR.
397 SF 332 SF
60 UNITS TOTAL 15 UNITS TOTAL
SITE TOTAL: 75
3 BR
1 BR: 24 UNITS
2 BR: 29 UNITS UNIT
3 BR: 22 UNITS
COMPACTOR
RECYCLING 237 SF
102 SF
COMMUNITY ROOM MECH
848 SF 32 SF
2 A-3
TLT
56 SF
FITNESS
536 SF
TLT
56 SF
ELEV
122 SF
3 BR ELEC / WATER
UNIT D W
2 BR 1 BR 2 BR W D D W
2 BR 1 BR 2 BR W D
DATA
93 SF
722 SF
UNIT UNIT UNIT UNIT UNIT UNIT
A-3 4
JAN. MECH
D W
116 SF 116 SF
19' - 8 3/4" STOR.
DEAD END 49 SF
TLT
MAIL
D W
UP 68 SF
143 SF
OFFICE RECEPTION
167 SF 396 SF
3 BR STAIR 1
LOBBY
356 SF
UNIT 189 SF D W W D D W W D
1 BR 2 BR 2 BR 3 BR 2 BR DATA MECH
CONFERENCE
UNIT UNIT UNIT UNIT UNIT PKGS
203 SF FILES WORK RM
111 SF MECH/ 137 SF
VEST. STOR.
68 SF 38 SF
N
1
A-3
First Floor Plan
Home Leasing - West Seneca
Page 43 of 1174
Page 44
A-3
3
3 BR
UNIT
3 BR W D
UNIT
W D
STAIR 2 DN
190 SF
UP
W D
2 BR
3 BR UNIT
UNIT
TRASH CHUTE /
RECYCLING
120 SF
2 BR
UNIT
2 A-3
D W
1 BR
UNIT
3 BR DATA
1 BR
UNIT D W
2 BR 1 BR 2 BR W D D W
2 BR 1 BR 2 BR W D
93 SF
UNIT
UNIT UNIT UNIT UNIT UNIT UNIT
A-3 4
D W
JAN. MECH
116 SF 116 SF
STAIR 1
D W
D W
189 SF
UP
3 BR DN
3 BR
UNIT D W W D D W W D
UNIT
1 BR 2 BR 2 BR 3 BR 2 BR 1 BR
UNIT UNIT UNIT UNIT UNIT UNIT
N
1
A-3
Second and Third Floor Plans
Home Leasing - West Seneca
Page 44 of 1174
Page 45
3 BR
UNIT
1 BR 2 BR
UNIT UNIT
LAUNDRY
216 SF
1 BR
MAINTENANCE OFFICE
UNIT
235 SF
1 BR 1 BR
UNIT UNIT
3 BR
UNIT
1 BR
UNIT
SECOND FLOOR PLAN
2 1/16" = 1'-0"
2 BR
UNIT
DN UP
UP
1 BR 1 BR
UNIT UNIT
LAUNDRY
184 SF
2 BR
FITNESS 2 BR
UNIT 1 BR UP
309 SF UNIT
UNIT
DN
3 BR DN LOBBY/MAIL
OFFICE
UNIT 257 SF
142 SF
CONCEPTUAL RENDERING CONF. RM
OFFICE
206 SF
311 SF
ENTRY
169 SF
N
FIRST FLOOR PLAN
1 1/16" = 1'-0"
Existing Building Plans and Rendering
Home Leasing - West Seneca
Page 45 of 1174
Page 46
LINE LEGEND SYMBOL LEGEND I-90
CAYUGA CREEK ROAD
SECTION/PARCEL BOUNDARY D DRAINAGE MANHOLE E ELECTRIC MANHOLE
MIN. BUILDING SETBACK EM
CENTER LINE INLET DRAINAGE MANHOLE ELECTRIC METER
EK
A CRE
EXIST. EASEMENT LINE CATCH BASIN T TELEPHONE MANHOLE CAYUG
EXIST. RIGHT-OF-WAY LINE
EXIST. EDGE OF PAVEMENT
END SECTION TP TELEPHONE PEDESTAL
WV H
END OF PIPE PROJECT
D
Y
EXISTING WATER MAIN, VALVE, & HYDRANT.
1720'±
W PEDESTRIAN POLE
EXISTING SANITARY SEWER, & MANHOLE.
S MANHOLE TRAF.
LOCATION
HARLEM ROAD
MH
EXISTING DRAINAGE SEWER, FIELD INLET, SIG. TRAFFIC CONTROL CABINET
D CAB.
INLET MANHOLE, MANHOLE, & END SECTION. S SANITARY MANHOLE FRENCH ROAD
8 LAMP POST
57 57 OH OH EXISTING OVERHEAD UTILITIES
8 C.O. CLEAN OUT
LIGHT POLE
T T EXISTING TELEPHONE GV
GAS VALVE UTILITY POLE WITH LIGHT
UG UG EXISTING UNDERGROUND UTILITIES
GS
UNION ROAD
579 583
C
G G EXISTING GAS GAS SERVICE FLAG
LI
580 5
81 FLAG POLE
N
GM POLE
TO
E E EXISTING ELECTRIC
582 583 GAS METER
N
584 MAILBOX
ST
585
EXISTING GUARD RAIL SV
R
MB
BU
586
M
583
EE
58 SPRINKLER VALVE
IN
585 0
T
BOLLARD
FF
582 587 TREE,HEDGE,EDGE OF WOODS
ER
AL
SH
AL
581
SPRINKLER HEAD
O
8 POST
SP
580
57 EXISTING SWALE
CR
RI
WV
NG
EE
5 88 X , , BARBED WIRE,STOCKADE,CHAIN LINKED FENCE WATER VALVE
SIGN
S
K
RO
58 WS
5 410 EXISTING CONTOUR
AD
' WATER SERVICE
589
" E 71.00 590
x 420.4 EXISTING SPOT ELEVATION @ X
SIGN
9
2159'1 1
HYDRANT
SIGN
N76°
TO
592 CONCRETE PAD/ CONCRETE SIDEWALK
P
WM
OF
WATER METER
580
TURNING ARROW INDIAN CHURCH ROAD
BA
7
NK
58
WELL
HANDICAP
CA
9 '
BORE
.3 STOP BAR
5
STOP
YU
58
9
16 C CABLE TV PEDESTAL TREE DECIDUOUS
S3
LOCATION SKETCH
GA
"E
2°
SIGNAL POLE TREE CONIFEROUS
41
14
NOT TO SCALE
5'
CR
5 BUSH
'
UTILITY POLE
12
°
EE
45
"E
GUY WIRE AC AIR CONDITIONING UNIT
N
K
N SAN
20
PULL BOX SANITARY UTILITY LATH
6
6.2
58
593 ELECTRIC PULL BOX G GAS UTILITY LATH
2'
5 ELEC.
58
RIM=593.19
(NO ACCESS)
S
TELEPHONE PULL BOX
W WATER UTILITY LATH
UTILITY INFORMATION
TELE. T TELEPHONE UTILITY LATH
58
5
TR TRAFFIC PULL BOX UTILITY INFORMATION PER UFPO DESIGN TICKET # 10313-000-071-00
594 E ELECTRIC UTILITY LATH
GRID
57 DATED OCTOBER 31, 2023
9
T TRANSFORMER C CABLE UTILITY LATH
595 1. BUCKEYE PIPELINE COMPANY 610-904-4475
586
N00° 32' 17"E 174.62'
2
59
2. CHARTER COM NORTHEAST WESTERN NY 317-575-7800 x2
RIM=594.92
(NO ACCESS)
593 3. ERIE COUNTY DIVISION OF SEWER MANAGEMENT 716-858-8760
587
57
8
S
S4
4. ERIE COUNTY WATER AUTHORITY 716-685-8207
3°
42
BO
5. NATIONAL FUEL GAS | BUFFALO - NFG101 716-857-7431
6
'1
59 TT
OM
594
7"
OF 6. NYS THRUWAY AUTHORITY | BUFFALO 716-635-6224
BA
E
GATE NK
17
7. NYSEG LANCASTER ELECTRIC 585-484-5115
8.
00
8. TOWN OF CHEEKTOWAGA 716-686-3450
'
7
59
579
BO 9. TOWN OF WEST SENECA HIGHWAY 716-674-5600 x261
T TO
M
OF
57 BA 10. VERIZON | BUFFALO 315-937-2515
8 N
8 59 K
587
CE
S5 58
0 NT
ER
9° LIN
95
2 9' 58
5
E
OF
'±
CR
5
13 E
"E EK
74
59
'
0
580
585
59 .72
599
58
11
59
139 0
6
5
59
7.8
4
TO
596 59
7 PO
FB 5'
AN
599
58 40 K
.8'
.7'
6 8
E
59
20
38"
FE
NC
599 ONE STORY 6.9 E
' 1" PIN
600 FRAME GARAGE
31'
APPROXIMATE LOCATION 0.4' ABOVE
FF=599.29'
EASEMENT TO ERIE COUNTY GRADE
°
SEWER DISTRICT #4
N22
PER REF. 4 TWO STORY
0
FRAME BARN 60
FF=600.25'
59
7"
.8'
.4'
30
13"
6
58
20" 600
N CE
ONE STORY
FE
FRAME BUILDING
7
IC
58
E
FF=600.15'
T
599
NC
AS
6" PVC
FE
PL
S
D
'
D
RIM=602.51
.98
OO
AN
48" 32" 599 (NO ACCESS)
W
C
PV
OD
2
4'
CONCRETE 4"
18
WO
596.80
580
585
E 0
5'
0" 59
STONE / 5
6.9 N/F
CONCRETE 59
CLINTON STREET REALTY
GRILL
'1
14" HOLDINGS
27
5
TG=598.70 T.A.# 124.00-2-5
59
2544 CLINTON STREET
8
6°
57
9
LIBER 11299 PAGE 9093
59
N3
ASPHALT AREA = 9.402 ACRES TO
TIE LINE
AREA = 12.733 ACRES TO
8
59
C.O. 36" 8" CENTERLINE OF CREEK 0
36" 60
ASPHALT
4"
C.O.
18"
6
59
30" 600
8"
8' 32"
T1
1
EK
0
7.
T2
24"
60
LO
11
LO
BA
NK
R E DEAD
8
59
O
F
C " E 59
7 10"
GA
M CONCRETE PAD
O
TT
37 W/ HVAC UNITS 15" STUMP
BO '
Y U 0 32"
7' HIGH
°5
CA
10"
9 TWO STORY
45 NK 59 10" STUMP
EK
K 24" BLOCK/FRAME 7' HIGH
B AN N O F BA BUILDING 600
E
RE
OF P 36" 10"
DOWNSPOUT
LIN WOODS
M TO 32"
TO DOWNSPOUT
FC
T 4"
BO
N60° 14' 10"W 1'
TIE
.4
EO
97 T GM FF=600.70'
69'± FF=602.53'
TO
8" 16"
2"E
LIN
T 30" 34"
' 5 15" 599
16
0'
ER
6
5
°
3.4
59
59
58 597
N/F
NT
K
N
T
EE
8"
73
CLINTON STREET REALTY
4
T 16"
59
593
30"
CR
8 15" HOLDINGS
CE
59
580 36"
OF
T.A.# 124.00-2-8
59
MB 13" 21
NE
6.7 2602 CLINTON STREET
2
'
1.3
O
T '
LI
5 LIBER 11299 PAGE 9093
58
ER
CONCRETE W/
19
FLAG 13" 598
'±T
15"
NT
0 POLE OVERHANG
577 59 48" 15"
CE
7
5 ORIGINAL
80
59 T ASPHALT
N18° 32' 09"E 48"
NORTHERLY RIGHT 21
7
8"
E 4.1
57
OF WAY LINE OF T ET '
VT
WV 49.86' CLINTON STREET NC
R
P
OH
CO 598
CONCRETE WALL TRUCK ROUTE W/ H
75
WV 597
35 MPH
36" MILE MARKER x.
'W
W 354/5301/2009 1.4
'
5.8
S69
59
APPROXIMATE LOCATION
19
T 1
4.0
APPROPRIATION OF LANDS ° 30 3' STONE WALL 10' WIDE EASEMENT TO 4.3 599
T 59
3
FOR HIGHWAY PURPOSES
W ' 45 BOX BEAM NEW YORK STATE
595
LIBER 9006 PAGE 213 "E GUIDE RAIL ELECTRIC & GAS
600 CORPORATION TG=595.23
W 599 598 NYSEG 596
PER REF. 4
"E
494 T
9
60
59
W
303
2
LO 597
50
NO #
LO T 1
60
1
T3
4
.36' 598
'
45
28" 24"
W W
9°
599
24"
N2
600 G 24"
W
GATE
W GATE
OH
FE
NC
6.2 E ONE STORY
6' CHAIN '
WV 3' STONE WALL 1-1/4" FRAME GARAGE
12" LINK FENCE PIPE
2.6 FF=601.19'
OH W
CL W N6 20" '
S60° 14' 10"E
0°
OH IN TO 14 19" 0 88.00'
.7'
'1 60 2.5
.3'
'
15
494/38
NS 0"W
20
G 15"
TR G 20" 22
.5'
WOOD
W
E 601 W
0'
OH GAZEBO
(W ET (
60
18"
D
Y
H
1.0
0
#2561 22"
AP
G IDT N.Y PR
O
3.0
'
13
X
HV .S.
'
IM
0
AT TWO STORY
OH
R
1.0
EL
AR
W I O OC G
FRAME HOUSE
16
.5'
25"
APP G ES) UT AT W
IO
25
FF=605.33'
CONCRETE
13
'
ROX N1
E
9.7
IMA 2" 7.6 1 STEPS 600
T E LO
CAT
OH W
354 AT
ER 2'
60 4.0
'
) N/F
.6'
ION
'
OH
6.6
MA
0"W
4" G
46
AS G IN 3.0 2.0 CLINTON STREET
MAI AP 602 G ' '
N P GM 48" REALTY HOLDINGS
W ROX W WA T.A.# 124.00-2-7
.4'
OH 13"
'5
IM L
AT 1.0 L 22
30
EL ' .5' 2574 CLINTON STREET
45
G OC 28" STUMP LIBER 11299 PAGE 9093
AT
IO
N6 2' HIGH AREA = 0.265 ACRES
.1'
9°
1.8 L
L
NYSEG "W 603
16
WA
'
AT G
S2
40
W ER M
SURVEY NOTES
602
W
AIN 34"
G OH
COVERED
12" 01
STOOP 6 1. TOPOGRAPHY SHOWN FROM A FIELD SURVEY BY COSTICH ENGINEERING
ON 12/8/2023 HORIZONTAL AND VERTICAL DATA OBTAINED THROUGH
G
604
MB G6
0 3
N60° 14' 10"W NYSDOT CORS NETWORK REFERENCED TO THE FOLLOWING MONUMENT
W W
G
AP
PR
88.00'
OX
G IM HAMBURG CORS STATION
AT
EL -LATITUDE: 42-43-02.66326 (N) NAD 83 (CORS)
OC
AT -LONGITUDE: 078-50-47.27326 (W)
G IO
W W N2
"G
AS
-ELLIP HEIGHT: 212.494 METERS NAVD 88 (CORS)
MA
IN
G
W W
W W
SITE DATA CERTIFICATION
REFERENCES
1. EXISTING ZONING: M-1 (MANUFACTURING DISTRICT) WE, COSTICH ENGINEERING, D.P.C., HEREBY CERTIFY T0:
1. DEEDS AS SHOWN ON FILE AT THE ERIE COUNTY CLERK'S OFFICE.
2. BULK REQUIREMENTS:
2. MAP OF THE EBENEZER LANDS FILED IN THE ERIE COUNTY CLERK'S
REQUIRED
OFFICE UNDER COVER NO. 58.
MIN. LOT AREA (SF) 20.,000
3. NEW YORK STATE DEPARTMENT OF TRANSPORTATION ACQUISITION MAP,
MAX LOT COVERAGE N/A
CLINTON STREET, PART I, S.H. NO. 371, ERIE COUNTY, MAP NO. 44, PARCEL
NO. 37., FILED AT LIBER 9006 OF DEEDS, PAGE 213.
MIN. LOT WIDTH (FT) 100
4. MAP ENTITLED "BOUNDARY SURVEY OF 2544 CLINTON STREET",
FLOOD NOTE: MAX. BUILDING HEIGHT (FT) 40 THIS MAP WAS PREPARED FROM NOTES OF AN INSTRUMENT SURVEY COMPLETED ON
PREPARED BY NUSSBAUMER & CLARKE, INC., HAVING JOB NO 15J2-0079,
By graphic plotting only, this property is in Zone X & Zone AE of the Flood DRAWING NO. SB-2535, DATED 2/4/2015. DECEMBER 8, 2023 AND FROM THE REFERENCE(S) LISTED HEREON. NO SEARCH OF
MIN. FRONT YARD SETBACK (FT) 50 RECORDS, OTHER THAN THOSE REFERENCED, WAS MADE FOR EASEMENTS OR
Insurance Rate Map No. 36029C0331H Community Panel No. 360262, Town of
West Seneca, which bears an effective date of 6/7/2019 and Zone X & Zone AE 5. MAP ENTITLED "BOUNDARY SURVEY OF 2602 CLINTON STREET", ENCUMBRANCES AFFECTING THIS PARCEL.
MIN. SIDE YARD SETBACK (FT) 50
of the Flood Insurance Rate Map No. 36029C0332H Community Panel No. PREPARED BY NUSSBAUMER & CLARKE, INC., HAVING JOB NO 15J2-0080,
360262, Town of West Seneca, which bears an effective date of 6/7/2019, No DRAWING NO. SB-2534, DATED 2/4/2015.
field surveying was performed to determine this zone and an elevation certificate
may be needed to verify this determination or apply for a variance from the Federal
MIN. REAR YARD SETBACK (FT) 10
By:
PRELIMINARY Date:
Emergency Management Agency.
Daniel T. Hickok, N.Y.S. L.S., No. 050449
PROJECT MANAGER TITLE OF PROJECT
EXISTING UTILITIES (LOCATION, SIZES AND INVERTS) SHOWN ON THE
PLANS ARE APPROXIMATE AND ARE NOT CERTIFIED AS TO THE
COPYRIGHT © 2023
OF NEW
D.T.H. Civil 2544 & 2574 CLINTON STREET PROPERTIES
COSTICH ENGINEERING, D.P.C. Y
TE WEST SENECA
ACCURACY OF THEIR LOCATION OR COMPLETENESS. THE DRAWN BY
GRAPHIC SCALE L T. H I Engineering
O OK
CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT IE K.E.L.
A
TITLE OF DRAWING
RK
C
ST
N
K
LOCATIONS AND DEPTHS OF ALL UTILITIES AND STRUCTURES IN THE IT IS A VIOLATION OF LAW FOR ANY Land EXISTING FEATURES
DA
50 0 25 50 100 200 BOUNDARY
PERSON, UNLESS ACTING UNDER THE
PATH OF, OR CLOSELY PARALLEL TO, OR UNDER, THE PROPOSED DIRECTION OF A LICENSED PROFESSIONAL G.M.S. Surveying
CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ENGINEER, LAND SURVEYOR, ARCHITECT
OR LANDSCAPE ARCHITECT, TO ALTER ANY TOPO/BASE LOCATION OF PROJECT TAX PARCEL NO.'S 124.00-2-5 & 124.00-2-7
DELAYS OR DAMAGES OCCURRING AS A RESULT OF INCORRECTLY Landscape
ITEM ON THIS DOCUMENT IN ANY WAY . M.G. PART OF LOTS 1,2, & 34 OF THE EBENEZER LANDS,
LOCATED UTILITIES. IT IS THE CONTRACTORS RESPONSIBILITY TO
R
ANY LICENSEE WHO ALTERS THIS Architecture LOT 123, TOWNSHIP 10, RANGE 7, BUFFALO CREEK RESERVATION,
LI C
NOTIFY THE VARIOUS UTILITY OWNERS IN AMPLE TIME FOR THEM TO ( IN FEET ) L.
YO
DOCUMENT IS REQUIRED BY LAW TO AFFIX S. DATE TOWN OF WEST SENECA, COUNTY OF ERIE, STATE OF NEW YORK
9
4
1 inch = 50 ft. NO. 0 5 0 4
EN
LOCATE AND MARK THEIR FACILITIES. THE CONTRACTOR SHALL ALSO HIS/HER SEAL AND THE NOTATION 12/18/2023
E
"ALTERED BY", FOLLOWED BY HIS/HER S V Costich CLIENT
LABELLA ASSOCIATES DWG. # 9263
NOTIFY UNDERGROUND UTILITY LOCATION SERVICE AT LEAST 48 ED R 217 Lake Avenue
SU
HOURS IN ADVANCE OF COMMENCING ANY WORK.
NO. DATE REVISION BY CHKD. APVLS.
SIGNATURE AND SPECIFIC DESCRIPTION OF
THE ALTERATION, TO THE DOCUMENT. L AND SCALE
1"=50' Engineering
Rochester, NY 14608
(585) 458-3020
300 STATE STREET - SUITE 201
ROCHESTER, NEW YORK 14614
VA100
SHEET 1 OF 1
Page 46 of 1174
Page 47
Prepared For:
Home Leasing, LLC
75 South Clinton Avenue, Suite 700
Rochester, NY 14604
Submitted by:
LaBella Associates
300 State Street, Suite 201
Rochester, NY 14614
(716) 551-6281
ENGINEERING REPORT FOR WEST SENECA
Date: October 2024
Last Revised: April 2026
LBA Project No. 2241067
Page 47 of 1174
Page 48
West Seneca Sewer Report | Page 1
Table of Contents
Section 1 – Introduction .................................................................................................................... 2
Section 2 – General.............................................................................................................................. 2
Section 3 – Proposed Sanitary Facilities .............................................................................. 2
Section 4 – Propsoed Stormwater Facilities ..................................................................... 6
Section 5 – Proposed Water Facilities ................................................................................... 9
Appendices
Attachment A – Site Location Map
Page 48 of 1174
Page 49
West Seneca Sewer Report | Page 2
Section 1 – Introduction
Home Leasing is proposing the development of a new affordable housing complex on a +/-
12.7-acre parcel in West Seneca, NY. Home Leasing is also seeking Site Plan Approval from
West Seneca and HCR 9% funding from New York State. The proposed development
includes 75 units split between a repurposing of the existing mansion on site to and a new 3-
story apartment building in the rear of the property. The project includes a private road
accessing the apartments, parking, sidewalks, playground, landscaping and stormwater
management facilities.
1.1 Site Location
The 12.7-acre site is nestled between Clinton Street (State Route 354) to the south and Cayuga
Creek to the North and West. Within a quarter mile of the development there are multiple
commercial uses and Interstate 90. The neighborhood is predominately comprised of
agricultural land, single- and two-family homes and industrial/manufacturing facilities. See
appendix A for location site map.
Section 2 – General
2.1 Existing Site Conditions
The existing site includes the above-mentioned mansion, two barns, a stone wall along
Clinton Street and parking areas. The barns and parking areas will be demolished, while the
existing stone wall will remain, with the entrance being widened to allow for emergency
vehicle access to the site.
The site topography is relatively flat with elevations generally ranging from 600 to 580. Storm
water runoff from site drains either via sheet flow directly to Cayuga Street, or to drainage
inlets that drain to Cayuga Creek. The existing drainage system on site is minimal and consists
of a small swale and dry detention basis which collects and re-directs off-site drainage from
the east. Drainage is then conveyed to Cayuga Creek via storm pipes and open drainage
swales.
2.2 Proposed Site Conditions
The proposed development includes 75 units split between a repurposing of the existing
mansion on site to now include apartments and one apartment building in the rear of the
property.
Project Data:
Facility Type: Affordable Housing
No. of Buildings: 2 (Including one existing)
Section 3 – Proposed Sanitary Facilities
3.1 Building Utility Services – Sanitary
The following summarizes the sanitary sewer service sizes for each building.
Page 49 of 1174
Page 50
West Seneca Sewer Report | Page 3
Table 1: Sanitary Lateral Sizes
Sanitary Lateral
Building # Description
Size
1 Existing Mansion 6”
2 Proposed Building 6”
3.2 Sanitary Sewer
The project requires a Down Stream Sewer Capacity analysis (DSCA) to conform with
NYSDEC regulations considering proposed sanitary flows are intended to convey a flow
greater than 2,500 gallons per day.
In accordance with Erie County policy a downstream, dry weather sanitary capacity analysis
is included. The monitoring report is included in the appendices.
Based on the flow depth measurements recorded the following conclusions are reached:
• At no time did the flow depth exceed pipe diameter at any of the downstream
monitoring points during the wet weather events monitored.
• One time during the monitoring period the depth of flow exceeded the diameter of
the pipe.
3.3 DSCA Summary
Erie County provided three (3) nodes, described below:
• Flow Monitoring Period: August 13, 2024, to September 18, 2024
• Dry Week Days Monitored: Aug 13-15, Aug 20-23, Aug 26-30, Sept 2-5, Sept 10-13,
and Sept 16-18.
• Dry Weekend Days Monitored: Aug 24-25, Sept 8, and Sept 14-15.
Nodes (manholes):
• Node 1 MH BAA8A – 48” RCP (Matthews Cemetery NW Corner)
• Node 2 MH BAA9A – 60” RCP (Casimer Street)
• Node 3 MH BAAA8 – 66” RCP (8 Cable Street)
Design Parameters:
Hydraulic Loading rates per NYS Design Standards for Intermediate Wastewater Treatment
Systems, March 5, 2014. Calculations included below:
Apartments – Bedroom Units = 110 gpd/unit
Office Space= 15 gpd / employee
Average Daily Design Flow:
One Bdrm Units:(24 units) x (1 bdrm/unit)x 110gpd/bdrm=2,640 gpd
Two Bdrm Units:(29 units) x (2 bdrm/unit)x110gpd/bdrm=6,380 gpd
Page 50 of 1174
Page 51
West Seneca Sewer Report | Page 4
Three Bdrm Units:(22 units) x (3 bdrm/unit)x110gpd/bdrm=7,260 gpd
Office Space: 4 Employees x 15 gpd = 60 gpd
Total = 16,340 gpd
Peak Hourly Flow (Sanitary): 16,340 gpd x Peak Factor
Total Population=[(24x1)+(29x2)+(22x3)]x2 people per bedroom=
=148x2= 296People (assume 2 people per bedroom)+4 office employees=300. P = 0.300 (in
thousands)
Peaking Factor = (18 + √P) / (4+√P) = (18+0.548)/(4+0.548)=4.08
Peak Sanitary Demand =16,340x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Sanitary Demand Calculations:
Node 1 – Average 16,340 gpd (0.016 MGD)
Entire Site:
110-gal/d/unit x 1bdrmx24 units=2,640 gpd
+ 110-gal/d/unit x 2bdrmx29 units=6,380 gpd
+110-gal/d/unitx3bdrmx22 units=7,260 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,340 gpd
Ave. Total = 16,340 gpd (0.016 MGD)
Assume 2 people per bedroom. 2 x 148 bedrooms = 296 people + 4 office employees = 300
people. P = 0.300 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,340 x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Node 2 – Average 16,340 gpd (0.016 MGD)
Entire Site:
110-gal/d/unit x 1bdrmx24 units=2,640 gpd
+ 110-gal/d/unit x 2bdrmx29 units=6,380 gpd
+110-gal/d/unitx3bdrmx22 units=7,260 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,340 gpd
Ave. Total = 16,340 gpd (0.016 MGD)
Assume 2 people per bedroom. 2 x 148 bedrooms = 296 people + 4 office employees = 300
people. P = 0.300 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,340 x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Node 3 – Average 16,340 gpd (0.016 MGD)
Page 51 of 1174
Page 52
West Seneca Sewer Report | Page 5
Entire Site:
110-gal/d/unit x 1bdrmx24 units=2,640 gpd
+ 110-gal/d/unit x 2bdrmx29 units=6,380 gpd
+110-gal/d/unitx3bdrmx22 units=7,260 gpd
4 employees x 15 gpd=60 gpd
Site total= 16,340 gpd
Ave. Total = 16,340 gpd (0.017 MGD)
Assume 2 people per bedroom. 2 x 148 bedrooms = 296 people + 4 office employees = 300
people. P = 0.300 (in thousands)
Peaking Factor = (18 + √P) / (4+√P) = 4.08
Peak Sanitary Demand = 16,340 x 4.08 = 66,667 gpd
0.06667 MGD
(0.10 CFS)
Table 2: Dry Weather Peak Weekday
Proposed
Total
Existing Peak Theoretical
Ave. Daily Peak Available Capacity
Node Sewer Peak Flow Sanitary Capacity
Flow (mgd) Flow (Y/N)
(mgd) Flow (mgd)
(mgd)
(mgd)
1-MH 48” RCP @ 0.41%
BAA8A (Matthews
0.016 7.953* 0.067 8.020 59.6 Y
Cemetery NW
Corner)
2-MH 60” RCP @ 0.042%
0.016 11.619** 0.067 11.686 34.6 Y
BAA9A (Casimer Street)
3-MH 66” RCP @ 0.026%
BAAA8 0.016 10.614*** 0.067 10.614 35.1 Y
(8 Cable Street)
Notes:
*Peak Dry Week Day for Nodes 1 on Aug 27,2024
**Peak Dry Week Day for Node 2 on Aug 21,2024
***Peak Dry Week Day for Node 3 on Aug 21,2024
Table 3: Dry Weather Peak Weekend Day
Proposed
Total
Ave. Daily Existing Peak Theoretical
Peak Available Capacity
Node Sewer Flow Peak Flow Sanitary Capacity
Flow (Y/N)
(mgd) (mgd) Flow (mgd)
(mgd)
(mgd)
1-MH 48” RCP @ 0.41%
BAA8A (Matthews
0.016 6.070* 0.067 6.137 59.6 Y
Cemetery NW
Corner)
Page 52 of 1174
Page 53
West Seneca Sewer Report | Page 6
2-MH 60” RCP @ 0.042%
BAA9A 0.016 11.972** 0.067 12.039 34.6 Y
(Casimer Street)
3-MH 66” RCP @ 0.026%
BAAA8 0.016 11.615*** 0.067 11.682 35.1 Y
(8 Cable Street)
Notes:
*Peak Dry Weekend Day for Nodes 1 on Aug 25,2024
**Peak Dry Weekend Day for Node 2 on Sept 14,2024
***Peak Dry Weekend Day for Node 3 on Sept 14,2024
3.5 DSCA CONCLUSION
Based on the analysis and flow monitoring results the flow depth peak increases are
described below. The combined sewer has sufficient capacity to handle projected peak
flows.
• Node 1 projected peak 0.067 MGD flow (0.10 CFS) result in approximately a 1.6 inch
water level increase within the 48” RCP sewer.
• Node 2 projected peak 0.067 MGD flow (0.10 CFS) result in approximately 2.6 inch
water level increase within the 60” RCP sewer.
• Node 3 projected peak 0.067 MGD flow (0.10 CFS) result in approximately 2.9 inch
water level increase within the 66” RCP sewer.
Full sewer calculations including – TECsmith Flow Monitoring Data, TECsmith Time Tables,
Eire County Flow Monitoring and Erie County Time Tables are included in the Full Sewer
Report which was previously provided to the town as a part of the Special Use Permit review
process.
Section 4 – Proposed Stormwater Facilities
4.1 Proposed Stormwater Loading
A Stormwater Pollution Prevention Plan (SWPPP) has been developed as part of this project
and is included under a separate cover. The proposed on-site storm system will outlet to
Cayuga Creek. The stormwater design meets the Town of West Seneca Town Code (2025-
09-08) - Chapter 102A Stormwater Management and Erosion and Sediment Control and the
NYSDEC 2024 Stormwater Design Manual Regulations. However, pertinent information
pertaining to existing and proposed stormwater loading has been included for analysis in the
table below.
4.2 Required WQv
Stormwater runoff from impervious surfaces is recognized as a significant contributor of
pollution that can adversely affect the quality of receiving water bodies. Therefore, treatment
of stormwater runoff is important since most runoff related water quality contaminants are
Page 53 of 1174
Page 54
West Seneca Sewer Report | Page 7
transported from land, particularly the impervious surfaces, during the initial stages of storm
events.
The Design Manual requires that water quality treatment be provided for the initial flush of
runoff from every storm. The NYSDEC refers to the amount of runoff to be treated as the
“Water Quality Volume” (WQv). Section 4.2 of the Design Manual defines the Water Quality
Volume as follows:
WQv = [(P )(R V )(A )]
12
Where: P = 90% Rainfall Event Number
Rv = 0.05 + 0.009 (I)
I = Impervious Cover (Percent)
A = Contributing Area in Acres
This definition ensures that, all other things being equal, the Water Quality Volume will
increase along with the impervious cover percentage. This redevelopment project is
proposing a combination of WQv treatment by standard practice(s) and alternative practice(s)
as shown in the following tables:
Table 4: Required WQv Summary
P (inches) A (Ac) I (Ac) Rv WQv Required (cf)
1.00 5.68 2.98 0.29 8,672
4.3 RRv Requirements
Land use change and development in the watershed increases the volume of runoff. As such,
reductions in the amount of runoff from new development, accomplished through the
implementation of a stormwater management plan for the site, will play an important role in
the success or failure of the watershed-wide stormwater management plan. Runoff reduction
techniques can be applied to manage, reduce, and treat stormwater, while maintaining and
restoring natural hydrology through infiltration, evapo-transpiration, and the capture and
reuse of stormwater. Volume reduction techniques by themselves typically are not sufficient
to provide adequate attenuation of stormwater runoff, but they can decrease the size of the
peak runoff rate reduction facilities.
Section 9.2.1.B of the 2024 NYSDEC Design Manual indicates, “Although encouraged, meeting
the RRv criteria is not required for the redevelopment activity portion of a project. The need
to provide RRv shall be considered separately for each design point. For design points with a
net increase in impervious area, RRv is required for the increase in impervious area only.”
As such, bioretentions and a water quality unit have been applied to the project to meet the
WQv objective for the redevelopment activity of the project. The increase in impervious cover
will be treated as new development and both the WQv criteria and RRv criteria are met. The
table below indicates the required RRv for the site.
Page 54 of 1174
Page 55
West Seneca Sewer Report | Page 8
Table 5: Required RRv
Total Minimum
Soil Soil Soil Soil
Increase in Weighted RRv
Group A Group B Group C Group D Rv
Impervious S Factor Required
(%) (%) (%) (%)
Area (Ac) (cf)
1.92 0 0 0 100 0.95 0.20 1,324
4.4 Provided WQv and RRv
The following table summarizes both the water quality volume and reduced runoff volume
provided by each practice:
Stormwater Practice WQv Treated (cf) RRv Provided (cf)
Bioretention (3 total areas) 3,338 1,337
Water Quality Unit 6,627 0
Total 9,965 1,337
Based on the above table, the WQv and RRv requirements are being met.
4.5 Discharge Rates
A comparison of the pre- and post-development watershed conditions was performed for all
Design Points and storm events evaluated. For all Design Points and design storms, this
comparison demonstrates that the peak rate of runoff will not be increased. Therefore, the
project will not have a significant adverse impact on the adjacent or downstream properties
or receiving water courses.
The results of the computer modeling used to analyze the pre- and post-development
watersheds are presented in the following table below:
Table 6: Summary of Pre-Development and Post-Development Peak Discharge Rates
10-year 24-hour storm event 100-year 24-hour storm event
Analysis Point
(AP)
Pre Post Pre Post
1 16.3 13.9 36.8 31.7
Based on the table above, the proposed stormwater flows have been reduced for all storm
events to below pre-development conditions.
A full stormwater pollution prevention plan per NYS Stormwater Design Manual, NYSDEC
SPDES General Permit for Stormwater Discharge from Construction Activity and NYSDEC
Page 55 of 1174
Page 56
West Seneca Sewer Report | Page 9
Standards and Specifications for Erosion and Sediment Control has been prepared for this
project. The SWPPP is included in the Site Plan Application Package.
Section 5 – Proposed Water Facilities
5.1 Proposed Water Connections
The project is proposing a new water connection to the Eire County Water Authority (EWCA)
12” water main on the north side of Clinton Street.
5.2 Existing Flow Test Data
Existing hydrant flow test data was provided for hydrant J11F55 and completed on 7/15/2019.
The existing water line is a 6” cast iron pipe on the south side of Clinton Street. The residual
pressure was 54 psi at 872 gpm.
5.3 Proposed Water Demand
The anticipated average daily water demand from the proposed development was
calculated using Table B-3 of the NYSDEC Design Standards for Intermediate Sized
Wastewater Treatment Systems, dated March 5, 2014. For apartments constructed after
1994, the average daily water demand per bedroom is 110-gallons per day. The proposed
project includes updating all water fixtures to modern energy efficient fixtures. Based on
this, the anticipated average daily water demand for the proposed development is as
follows:
Table 7: Anticipated Water Demand
Average Daily Demand
No. of Bedrooms No. of Units Water Demand Per Unit (GPD)
(GPD)
1 Bedroom 24 110 2,640
2 Bedroom 29 220 6,380
3 Bedroom 22 330 7,260
Total Average Daily Demand 16,340
Maximum Day (2x Average Daily) 32,680
Peak Hourly (4x Average Daily) 35,360
5.4 Proposed Fire Protection and Backflow
The project is proposing one combined service from Clinton Street, which will split into
combined services feeding the existing mansion and new building respectively. New
backflow prevention devices are proposed for each of the buildings, splitting into separate
domestic and fire services after the backflows. The domestic services will be metered within
each building. The private hydrants on site will be fed after the backflow within each building.
Refer to the MEP and FP plans for detailed design.
Page 56 of 1174
Page 57
Stormwater Pollution Prevention Plan
Prepared for:
Home Leasing
75 South Clinton Avenue, Suite 700,
Rochester, NY 14604
Submitted by:
LaBella Associates
300 Pearl Street, Suite 130
Buffalo, NY 14202
(716) 551-6281
West Seneca Apartments
Town of West Seneca, Erie County, New York
Date: April 2026
Last revised: April 2026
Project No. 2241067
Page 57 of 1174
Page 58
Page 58 of 1174
Page 59
PREPARER OF THE SWPPP
“I certify under penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.”
Name and Title1: Kristopher Winkler, PE
Date: Issued: April 2026
1 This is a signature of a New York State licensed Professional Engineer employed by LaBella Associates that is duly
authorized to sign and seal Stormwater Pollution Prevention Plans (SWPPPs), NOIs, and NOTs prepared under their direct
supervision. Refer to Appendix B for the SWPPP Preparer Certification Form, and Appendix I for the LaBella Certifying
Professionals Letter.
Page 59 of 1174
Page 60
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY .................................................................................................................... 1
1.1 Project Description ................................................................................................................... 1
1.2 Stormwater Pollution Controls................................................................................................. 2
2.0 SITE CHARACTERISTICS .................................................................................................................. 3
2.1 State Environmental Quality Review ....................................................................................... 3
2.2 Land Use and Topography ....................................................................................................... 3
2.3 Soils and Groundwater............................................................................................................. 3
2.4 Watershed Designation ........................................................................................................... 4
2.5 Receiving Water Bodies ........................................................................................................... 4
2.6 Aquifer Designation .................................................................................................................. 4
2.7 Wetlands ................................................................................................................................... 4
2.8 Flood Plains .............................................................................................................................. 4
2.9 Listed, Endangered, or Threatened Species .......................................................................... 5
2.10 Historic Places ........................................................................................................................ 5
2.11 Rainfall Data........................................................................................................................... 5
2.12 Pre-development Watershed Conditions .............................................................................. 5
2.13 Post-development Watershed Conditions ............................................................................ 6
2.14 Description of Design Points ................................................................................................. 6
3.0 STORMWATER MANAGEMENT PLANNING .................................................................................... 6
3.1 STEP 1 – Site Planning ............................................................................................................ 7
3.2 STEP 2 – Calculate Water Quality Treatment Volume (WQv) ................................................ 7
3.3 STEP 3 – Apply RR Techniques and Standard SMPs with RRv Capacity to Reduce
Total WQv......................................................................................................................................... 8
3.4 STEP 4 – Calculate the Minimum RRv Required.................................................................... 9
3.5 STEP 5 – Apply Standard SMPs to Address Remaining Water Quality Volume .................... 9
3.6 STEP 6 - Apply Volume and Peak Rate Control .................................................................... 11
3.7 Climate Change Consideration .............................................................................................. 13
4.0 CONSTRUCTION SEQUENCE ......................................................................................................... 14
5.0 CONSTRUCTION-PHASE POLLUTION CONTROL ........................................................................... 14
5.1 Temporary Erosion and Sediment Control Measures .......................................................... 15
5.2 Permanent Erosion and Sediment Control Measures ......................................................... 17
5.3 Implementation Schedule for Erosion and Sediment Control Measures ........................... 17
Page 60 of 1174
Page 61
5.4 Other Pollutant Controls......................................................................................................... 18
5.5 Construction Housekeeping Practices .................................................................................. 21
6.0 INSPECTIONS, MAINTENANCE, AND REPORTING ....................................................................... 22
6.1 Inspection and Maintenance Requirements ........................................................................ 22
6.2 Reporting Requirements ........................................................................................................ 24
7.0 SWPPP IMPLEMENTATION RESPONSIBILITIES ........................................................................... 26
7.1 Owner’s/Operator's Responsibilities..................................................................................... 26
7.2 Owner’s/Operator’s Engineer’s Responsibilities.................................................................. 29
7.3 Contractor's Responsibilities ................................................................................................. 30
7.4 Qualified Inspector’s/Qualified Professional’s Responsibilities ......................................... 31
7.5 SWPPP Participants ............................................................................................................... 33
LIST OF TABLES
Table 1: USDA Soil Data .............................................................................................................................. 3
Table 2: Project Site HSG Data ................................................................................................................... 3
Table 3: Rainfall Data .................................................................................................................................. 5
Table 4: Required WQv Treatment by Alternative Practice ....................................................................... 8
Table 5: WQv Required Summary ............................................................................................................... 8
Table 6: Summary of Standard SMPs with RRv Capacity being Applied .................................................. 9
Table 7: RRv Summary ................................................................................................................................ 9
Table 8: Summary of WQv Provided ......................................................................................................... 10
Table 9: Summary of Hydrodynamic Unit(s) ............................................................................................. 11
Table 10: Design Events ............................................................................................................................ 13
Table 11: CPv Summary ............................................................................................................................ 13
Table 12: Summary of Pre- and Post-Development Peak Discharge Rates ........................................... 13
Table 13: Implementation Schedule for Erosion and Sediment Control Measures .............................. 18
Table 14: Common Construction Pollutants ............................................................................................ 20
Page 61 of 1174
Page 62
APPENDICES
Appendix A: Figures
• A-1: Site Location Map
• A-2: Soils Map
• A-3: Historic Places Screening Map
• A-4: Environmental Resource Map
• A-5: FEMA Firm Map
• A-6: Pre-Development Watershed Delineation Map (Pocket)
• A-7: Post-Development Watershed Delineation Map (Pocket)
Appendix B: Forms
• Notice of Intent (NOI)
• MS4 SWPPP Acceptance Form
• SWPPP Preparer Certification Form
• Owner/Operator Certification Form
• Contractor and Subcontractor Certification Forms
• Notice of Termination (NOT)
Appendix C: Project Evaluation and Design Calculations
Appendix D: Pre-Development Stormwater Modeling
Appendix E: Post-Development Stormwater Modeling
Appendix F: SWPPP Inspection Report (Sample Form)
Appendix G: Post-Construction Inspections and Maintenance
Appendix H: NYSDEC “Deep-Ripping and Decompaction,” April 2008
Appendix I: LaBella Certifying Professionals Letter
Appendix J: NYSDEC SPDES General Permit GP-0-25-001
Page 62 of 1174
Page 63
1.0 EXECUTIVE SUMMARY
This Stormwater Pollution Prevention Plan (SWPPP) has been prepared for major activities associated
with construction of a 75-unit affordable housing complex and related site work in the Town of West
Seneca. This SWPPP includes the elements necessary to comply with the national baseline general
permit for construction activities enacted by the U.S. Environmental Protection Agency (EPA) under the
National Pollutant Discharge Elimination System (NPDES) program and all local governing agency
requirements. This SWPPP must be executed, and permit coverage must be obtained prior to the
commencement of construction activity.
This SWPPP has been developed in accordance with the “New York State Department of Environmental
Conservation (NYSDEC) State Pollutant Discharge Elimination System (SPDES) General Permit for
Stormwater Discharges from Construction Activity,” Permit No. GP-0-25-001, effective January 29,
2025 through January 28, 2030. The SWPPP and accompanying plans identify and detail stormwater
management, pollution prevention, and erosion and sediment control measures necessary during and
following completion of construction.
This SWPPP and the accompanying plans entitled “West Seneca Apartments” have been submitted as
a set. These engineering drawings are considered an integral part of this SWPPP. Therefore, this
SWPPP is not considered complete without them. References made herein to “the plans” or to a
specific “sheet” refer to these drawings.
This report considers the impacts associated with the intended development with the purpose of:
1. Maintaining existing drainage patterns as much as possible while continuing the conveyance
of upland watershed runoff;
2. Controlling increases in the rate of stormwater runoff resulting from the proposed development
so as not to adversely alter downstream conditions; and
3. Mitigating potential stormwater quality impacts and preventing soil erosion and sedimentation
resulting from stormwater runoff generated both during and after construction.
The analysis and design completed and documented in this report is intended to be part of the
application made for a multi-family residential redevelopment project with an increase in impervious
area completed on behalf of the Owner/Operator.
1.1 Project Description
Home Leasing is proposing redevelopment project with an increase in impervious area, to include: 75-
unit affordable housing building, associated parking, sidewalks, and landscaping. The total project
area of disturbance proposed is 5.7 acres. The project will disturb one (1) or more acres and as
such, preparation of this SWPPP is required under GP-0-25-001. A Site Location Map has been
provided in Appendix A, as Figure A-1.
This type of project is included in Table 2 of Appendix B of GP-0-25-001; and the project site is not
located in one of the watersheds listed in Appendix C of GP-0-25-001. Therefore, this SWPPP includes
post-construction stormwater management practices, as well as erosion and sediment controls.
project is located within the Town Of West Seneca regulated, traditional land use control Municipal
Separate Stormwater Sewer System (MS4). Therefore, an MS4 SWPPP Acceptance Form is required
to accompany NOIs submitted to the NYSDEC.
Stormwater Pollution Prevention Plan
Page 1
2241067
Page 63 of 1174
Page 64
Runoff from the project site will discharge to the Cayuga Creek, which is not included in the list of
Section 303(d) water bodies included in Appendix D of GP-0-25-001.
Project construction activities will consist primarily of site grading, paving, building construction, and
the installation of storm drainage, water supply, sanitary sewer, and public utility infrastructure
necessary to support the proposed redevelopment project with an increase in impervious area.
Construction phase pollutant sources anticipated at the site are disturbed (exposed) soil, vehicle fuels
and lubricants, chemicals associated with building construction, and building materials. Without
adequate control there is the potential for each type of pollutant to be transported by stormwater.
1.2 Stormwater Pollution Controls
The stormwater pollution controls outlined herein have been designed and evaluated in accordance
with the following standards and guidelines:
• New York State Stormwater Management Design Manual, dated July 31, 2024 (Design
Manual).
• New York State Standards and Specifications for Erosion and Sediment Control, dated
November 2016 (SSESC).
• Town of West Seneca Town Code (2025-09-08) - Chapter 102A Stormwater Management and
Erosion and Sediment Control
Stormwater quality will be enhanced through the implementation of temporary and permanent erosion
and sediment control measures, the proposed stormwater management practice(s), and other
construction-phase pollution controls outlined herein.
The proposed stormwater management approach consisting of pipes, open drainage ways, and on-
site stormwater management practices will adequately collect, treat, and convey the stormwater
runoff.
Bioretentions and a water quality unit will be used to manage and treat stormwater runoff generated
by the proposed redevelopment project with an increase in impervious area.
Pre- and post-development surface runoff rates have been evaluated for the 1-, 10-, and 100-year 24-
hour storm events. Comparison of pre- and post-development watershed conditions demonstrates that
the peak rate of runoff from the project site will not be increased.
The pollutant loading analysis indicates stormwater quality will be enhanced through the
implementation of the proposed stormwater management practices outlined herein.
The post-construction stormwater management practice(s) will be privately owned by Home Leasing.
Deed restrictions will be in place, which require operation and maintenance of the practice(s) in
accordance with the operation and maintenance plan.
Stormwater Pollution Prevention Plan
Page 2
2241067
Page 64 of 1174
Page 65
2.0 SITE CHARACTERISTICS
2.1 State Environmental Quality Review
The construction activity is subject to State Environmental Quality Review (SEQR). The project is
considered a Unlisted action. As such, SEQR coordination has been completed. Negative Declaration
issued on 1/27/2025, amended on 2/9/2026. A copy of the SEQR documentation, in accordance
with Part I.A.5. of GP-0-25-001, is provided in Appendix A, as Figure A-5 upon receipt.
2.2 Land Use and Topography
The project site is located within the R-50 zoning district. Multiple-family dwellings is a permitted use
subject to a special use permit within this district. Special Use Permit was obtained on 2/9/2026.
The overall site is slightly sloping, with slopes ranging from 1 to 10 percent. Site elevations range from
approximately 580 feet above mean sea level (MSL) to 600 feet MSL. The site generally slopes to the
north and the west towards Cayuga Creek.
2.3 Soils and Groundwater
The US Department of Agriculture (USDA) Web Soil Survey (http://websoilsurvey.nrcs.usda.gov/app/)
was used to obtain surficial soil conditions for the study area, as follows:
Table 1: USDA Soil Data
Depth to Depth to
Hydrologic Erosion
Map Symbol & Description Water Table Bedrock
Soil Group Factor K
(feet) (feet)
Fu - Fluvaquents and Udifluvents, frequently
A/D 0.17 0.50 >6.0
flooded
GaA - Galen very fine sandy loam, 0 to 3
A/D 0.37 1.75 >6.0
percent slopes
GaB - Galen very fine sandy loam, 3 to 8
A/D 0.37 1.75 >6.0
percent slopes
Te – Teel silt loam B/D 0.37 1.75 >6.0
Upon review of the soil data presented in Table 1, the project site does not contain soils with a soil
slope phase of D with a map unit name that inclusive of slopes greater than 25%, and does not contain
soils with a soil slope phase of E or F.
The project site is composed of HSG A soils, HSG B soils, and HSG D soils, as shown in the table below.
For the purposes of this report, HSG X/D soils were modeled as HSG D soils to reflect the undrained
condition.
Table 2: Project Site HSG Data
HSG A HSG B HSG C HSG D
0% 0% 0% 100%
Stormwater Pollution Prevention Plan
Page 3
2241067
Page 65 of 1174
Page 66
The Soil Conservation Service defines the hydrologic soil groups as follows:
• Type A Soils: Soils having a high infiltration rate and low runoff potential when thoroughly wet.
These soils consist mainly of deep, well drained to excessively drained sands or gravelly sands.
These soils have a moderate rate of water transmission.
• Type B Soils: Soils having a moderate infiltration rate when thoroughly wet and consisting
mainly of moderately deep to deep, moderately well to well drained soils with moderately fine
to moderately course textures. These soils have a moderate rate of water transmission.
• Type D Soils: Soils having a very low infiltration rate and high runoff potential when thoroughly
wet. These soils consist chiefly of clays that have high shrink-swell potential, soils that have a
permanent high water table, soils that have a clay pan or clay layer at or near the surface, and
soils that are shallow over nearly impervious material. These soils have a very low rate of water
transmission.
The soils map for the study area is presented in Appendix A, as Figure A-2.
2.4 Watershed Designation
The project site is not located in a restricted watershed identified in Appendix C of GP-0-25-001.
2.5 Receiving Water Bodies
The nearest natural classified water course into which runoff from the project site will discharge is
Cayuga Creek. Cayuga Creek is classified by NYSDEC as a Class C water course, and is not included
in the Section 303(d) list of impaired waters found in Appendix D of GP-0-25-001.
2.6 Aquifer Designation
The project site is not located over a US EPA designated Sole Source aquifer; nor is it located over a
Primary or Principal aquifer listed in the NYSDEC Technical and Operational Guidance Series (TOGS)
2.1.3 (1980).
2.7 Wetlands
A search on the NYSDEC Environmental Resource Mapper on April 16, 2026, and a review of GIS
data, determined that there are no known regulated wetlands located on or in the vicinity of the project
site. A wetland delineation is scheduled for Spring 2026 to field verify if there are any wetland on site.
2.8 Flood Plains
According to the National Flood Insurance Program Flood Insurance Rate Map (FIRM), Town of West
Seneca, New York, Community, the project site lies within Flood Zone X, areas determined to be outside
500-year floodplain The FEMA Flood Map has been provided in Appendix A, as Figure A-5.
Stormwater Pollution Prevention Plan
Page 4
2241067
Page 66 of 1174
Page 67
2.9 Listed, Endangered, or Threatened Species
A search was performed on the NYSDEC Environmental Resource Mapper on April 16, 2026, and
determined that the project site may contain threatened or endangered species, or critical habitat.
An Environmental Resource Map has been provided in Appendix A, as Figure A-4.
2.10 Historic Places
A search on the New York State Cultural Resource Information System (CRIS) database, performed on
April 16, 2026, revealed the construction activity is located within an archeologically sensitive area A
printout of the historic places screening map is presented in Appendix A, as Figure A-3. As such,
NYSOPRHP coordination has been completed and a Phase 1 Archeological Survey was conducted on
June 22, 2023 by archeologist. A copy of the NYSOPRHP documentation, in accordance with Part I.A.4.
of GP-0-25-001, is provided in Appendix A, as Figure A-3A upon receipt.
2.11 Rainfall Data
Rainfall data utilized in the modeling and analysis was obtained from the Cornell University online
Extreme Precipitation in New York & New England website (http://precip.eas.cornell.edu/). A local IDF
file was imported, and specific mass curves were generated, in HydroCAD to evaluate the pre- and
post-development stormwater runoff characteristics. Rainfall data specific to the portion of Erie
County under consideration, for various 24-hour storm events, is presented in the following Table:
Table 3: Rainfall Data
Storm Event 24-Hour Rainfall
Return Period (inches)
1-year 1.82
10-year 3.14
100-year 5.22
2.12 Pre-development Watershed Conditions
The pre-development project site is covered predominantly by buildings, pavement, grass, and woods.
Analysis of pre-development conditions considered existing drainage patterns, soil types, ground
cover, and topography. The Pre-Development Watershed Delineation Map has been provided in
Appendix A, as Figure A-5.
The results of the computer modeling used to analyze the overall watershed under pre-development
conditions are presented in Appendix D. A summary of the pre-development watershed runoff rates at
each Design Point is presented in Table 10.
Subcatchment one is a 3.38± acre watershed consisting of grass and pavement. Runoff flows south
overland via sheet and shallow concentrated flow toward a swale and catch basin at the southeast
corner of the site. This subcatchment is tributary to Design Point (AP) 1.
Subcatchment two is a 7.74± acre watershed consisting of grass, pavement, and multiple buildings.
Runoff flows west overland via sheet and shallow concentrated flow toward Cayuga Creek west of the
site. This subcatchment is tributary to Design Point (AP) 1.
Stormwater Pollution Prevention Plan
Page 5
2241067
Page 67 of 1174
Page 68
2.13 Post-development Watershed Conditions
The post-development project site is covered predominantly by buildings, pavement, sidewalks, grass,
and woods. The analysis of post-development conditions considered existing drainage patterns, soil
types, ground cover to remain, planned site development, site grading, and stormwater management
facilities proposed as part of site improvements. The Post-Development Watershed Delineation Map
has been provided in Appendix A, as Figure A-6.
The results of the computer modeling used to analyze the overall watershed under post-development
conditions are presented in Appendix D. A summary of the post-development watershed runoff rates
at each Design Point is presented in Table 11.
There are numerous locations and methods for providing controls of off-site discharge of stormwater
from the project site. Each has been designed to provide the above quantity controls by attenuating
stormwater runoff and releasing runoff to off-site locations at a rate equal to or less than that which
existed prior to development of the site. Each device is detailed on the accompanying plans. A Post-
Development Watershed Delineation Map, with the tributary areas to each stormwater management
practice proposed, has been provided in Appendix A, as Figure A-6.
2.14 Description of Design Points
The study area consists of the 11.2 acre project site and 5.7 acre area of disturbance. The overall
watershed was broken down into smaller watersheds, or subcatchments, to allow for analysis of runoff
conditions at several locations throughout the study area. Each of these locations was defined as a
Design Point (DP) in order to compare the effects resulting from stormwater management facilities
proposed as part of the project. Descriptions of each of the selected Design Points are provided below.
• Design Point 1: Off-site discharge to Cayuga Creek
3.0 STORMWATER MANAGEMENT PLANNING
Chapter 3 of the Design Manual outlines a six-step planning process for site planning and selection of
stormwater management practices that must be implemented for both new development and
redevelopment projects. This process is intended to develop a design that maintains pre-construction
hydrologic conditions through the application of environmentally sound development principles, as
well as treatment and control of runoff discharges from the site. The following sections outline the
step-by-step process and how it has been applied to this project.
The goals of this Stormwater Management Plan are to analyze the peak rate of runoff under pre- and
post-development conditions, to maintain the pre-development rate of runoff in order to minimize
impacts to adjacent or downstream properties, and to minimize the impact to the quality of runoff
exiting the site.
The Design Manual provides both water quality and water quantity objectives to be met by projects
requiring a “Full SWPPP”. These objectives will be met by applying stormwater control practices to limit
peak runoff rates and improve the quality of runoff leaving the developed site.
Stormwater Pollution Prevention Plan
Page 6
2241067
Page 68 of 1174
Page 69
3.1 STEP 1 – Site Planning
During the Site Planning process, the project site is evaluated for implementation of the green
infrastructure planning measures identified in Table 3.1 of the Design Manual, in order to preserve
natural resources and reduce impervious cover. Appendix C provides a description of each green
infrastructure planning measure, along with a project specific evaluation.
3.2 STEP 2 – Calculate Water Quality Treatment Volume (WQv)
Stormwater runoff from impervious surfaces is recognized as a significant contributor of pollution that
can adversely affect the quality of receiving water bodies. Therefore, treatment of stormwater runoff
is important since most runoff related water quality contaminants are transported from land,
particularly the impervious surfaces, during the initial stages of storm events.
3.2.1 NYSDEC Requirements for Water Quality Volume
The Design Manual requires that water quality treatment be provided for the initial flush of runoff from
every storm. The NYSDEC refers to the amount of runoff to be treated as the “Water Quality Volume”
(WQv). Section 4.2 of the Design Manual defines the Water Quality Volume as follows:
WQv = (P)(R V )(A)
12
Where: P = 90% Rainfall Event Number
Rv = 0.05 + 0.009 (I)
I = Impervious Cover (Percent)
A = Contributing Area in Acres
This definition ensures that, all other things being equal, the Water Quality Volume will increase along
with the impervious cover percentage.
3.2.2 Methodology for Redevelopment Projects
Chapter 9 of the Design Manual outlines alternative WQv treatment objectives for redevelopment
projects.
According to Section 9.2.1.B.IV, redevelopment activities can achieve the water quality treatment
objective through a combination of impervious cover reduction, standard SMPs, and alternative SMPs
that provide a weighted average of at least two of the above methods, calculated as shown below. In
this case, 100% of any new increase in impervious area to a given design point must be treated by
approved alternate SMPs, standard SMPs, or RR techniques.
%ALT = [25-(% ICRED+ %SMP+ %RR)] x 3
Where:
%ALT = Percent of redevelopment impervious area treated by alternative SMP(s)
%ICRED = Percent reduction in existing disturbed impervious area
%SMP = Percent of redevelopment impervious area treated by standard SMP(s)
%RR = Percent of redevelopment impervious area treated by runoff reduction techniques(s)
Stormwater Pollution Prevention Plan
Page 7
2241067
Page 69 of 1174
Page 70
This redevelopment project is proposing a combination of WQv treatment by standard practice(s) and
alternative practice(s) as shown in the following tables:
Table 4: Required WQv Treatment by Alternative Practice
WQv Treatment by Impervious Cover WQv Treatment by Runoff Reduction
Alternative Practice Reduction (IC) Standard Practice
% Area (ac) % Area (ac) % Area (ac) % Area (ac)
38 2.13 0 0 34 1.96 0 0
Table 5: WQv Required Summary
P (inches) A (ac) I (ac) Rv WQv Required
1.00 5.68 2.98 0.29 8,672 cf 0.20 AF
The Water Quality Volume equation has been applied to the drainage area tributary to each of the
stormwater quality practices proposed for this project. The practices have been sized to accommodate
the Water Quality Volume, as per the performance criteria presented in Chapter 6 and/or Chapter 9 of
the Design Manual. Water quality volume calculations for each of the proposed practices are
presented in Appendix C.
3.3 STEP 3 – Apply RR Techniques and Standard SMPs with RRv Capacity to Reduce Total
WQv
Land use change and development in the watershed increases the volume of runoff. As such,
reductions in the amount of runoff from new development, accomplished through the implementation
of a stormwater management plan for the site, will play an important role in the success or failure of
the watershed-wide stormwater management plan. Runoff reduction techniques can be applied to
manage, reduce, and treat stormwater, while maintaining and restoring natural hydrology through
infiltration, evapo-transpiration, and the capture and reuse of stormwater. Volume reduction
techniques by themselves typically are not sufficient to provide adequate attenuation of stormwater
runoff, but they can decrease the size of the peak runoff rate reduction facilities.
3.3.1 NYSDEC Requirements for Redevelopment
Section 9.2.1.B of the Design Manual indicates, “Although encouraged, meeting the RRv criteria is not
required for the redevelopment activity portion of a project. The need to provide RRv shall be
considered separately for each design point. For design points with a net increase in impervious area,
RRv is required for the increase in impervious area only.”
As such, bioretentions and a water quality unit have been applied to the project to meet the WQv
objective for the redevelopment activity of the project. The increase in impervious cover will be treated
as new development and both the WQv criteria and RRv criteria are met.
3.3.2 Application of Standard Stormwater Management Practices (SMPs) with RRv Capacity
The following Table demonstrates a summary of the standard SMP(s) with RRv capacity that have been
incorporated into the stormwater management plan for this project. The standard SMP(s) with RRv
capacity have been designed in accordance with Chapter 6 of the Design Manual. Refer to the contract
drawings for practice dimensions, material specifications, and installation details. Practice specific
calculations are presented in Appendix C.
Stormwater Pollution Prevention Plan
Page 8
2241067
Page 70 of 1174
Page 71
Table 6: Summary of Standard SMPs with RRv Capacity being Applied
WQv
Pretreatment
Standard Pretreatment WQv Reduced WQv Total WQv
Design Volume RRv
SMP with Volume Required /RRv Treated1 Provided2
Variant Required Capacity
RRv Capacity Provided (CF) (CF) Provided (CF) (CF)
(% of WQv)
(CF)
Filtration
F-5 25 835 40% 8,672 1,337 2,001 3,338
Bioretention
Footnotes:
1WQv Treated = WQV Required - RRv Provided
2Total WQv Provided = WQV Treated + RRv Provided
3.3.3 RRv Performance Summary
A summary of the RRv provided is presented in the following table:
Table 7: RRv Summary
RRv Provided % RRv Provided/
WQv Required (CF)
WQv Reduced (CF) WQv Reduced
8,672 1,337 >100%
As indicated in the above table, the RRv provided is greater than the RRv required for the project site.
As such, the RRv criteria has been met and the designer can proceed to Step 6.
3.4 STEP 4 – Calculate the Minimum RRv Required
As indicated above, Section 9.2.1.B of the Design Manual indicates, “Although encouraged, meeting
the RRv criteria is not required for the redevelopment activity portion of a project.”
3.5 STEP 5 – Apply Standard SMPs to Address Remaining Water Quality Volume
If the entire Water Quality Volume is not treated through implementation of RR techniques and
standard SMPs with RRv capacity, then the design must achieve the remaining WQv through the
standard SMPs listed in Table 3.3 of the Design Manual or the Alternative Practices outlined in Section
9.4 of the Design Manual.
Stormwater Pollution Prevention Plan
Page 9
2241067
Page 71 of 1174
Page 72
Table 8: Summary of WQv Provided
Step 5
Step 3
Reduced WQv to be
Step 2 WQv Reduction by
Treated by Standard
WQv Required (CF) Standard SMPs w/ RRv
SMPs or Alternative
Capacity (CF)1
Practices (CF)2
8,672 3,338 6,627
Footnotes:
1Step 3: WQv Reduction = RRv Provided + WQv Treated by Standard SMP with RRv Capacity
2Step 5: Reduced WQv to be Treated = WQv Required – WQv Reduced
Based upon the results listed in the above Table, the entire WQv has not been treated by application
of RR techniques and standard SMPs with RRv capacity. As such, the standard SMPs or the Alternative
Practices (without RRv capacity) described in the following sections, have been incorporated into the
stormwater management plan for this project, to meet the WQv objective. Practice-specific calculations
are presented in Appendix C.
3.5.1 Underground Stormwater Detention System
Underground stormwater detention systems store and detain stormwater runoff in order to meet water
quantity control requirements. Stormwater is stored in subsurface vaults and/or a system of large
diameter interconnected storage pipes. Stored water is then released at rates designed to reduce
peak run-off flows during post-development storms. Underground stormwater storage provides
minimal stormwater quality benefits, but can be an effective component of a development’s overall
stormwater management plan.
3.5.2 Hydrodynamic Separators
Hydrodynamic separators accelerate the separation of floating and settling pollutants from stormwater
through the use of a vortex. These pre-fabricated devices come in the form of an underground manhole
or vault. The devices have no moving parts and are typically fabricated from concrete and marine grade
aluminum.
During operation, stormwater runoff enters the unit tangentially to promote a gentle swirling motion in
a treatment chamber. As stormwater circles within the chamber, settable solids fall into a sump and
are retained. Buoyant debris, oil, and grease rise to the surface and are separated from the water as
it flows under a baffle wall. Finally, treated water exits the treatment chamber through a flow control
orifice located behind the baffle wall.
During low-flow conditions all runoff is diverted into the treatment chamber by a flow partition. At higher
flow rates, a portion of the runoff spills over the flow partition and is diverted around the treatment
chamber to prevent re-suspension and washout of previously trapped pollutants. Water that spills over
the partition flows into a head equalization chamber above the treatment chamber outlet. As the head
equalization chamber fills, the head differential driving flow through the treatment chamber collapses.
The result is that flow rates in the treatment chamber remain relatively constant even as total flow
rates increase substantially. This configuration further reduces the potential for re-suspension or
washout.
Stormwater Pollution Prevention Plan
Page 10
2241067
Page 72 of 1174
Page 73
According to Chapter 9 of the Design Manual, hydrodynamic separators of the type proposed for this
project have been approved for use as a pretreatment system in new and redevelopment projects or
as a primary treatment system on redevelopment projects.
According to Chapter 9 of the Design Manual, membrane filtration, of the type proposed for this project,
has been approved for use as a primary treatment system on redevelopment projects.
The following Table summarizes both the Water Quality Volume requirements and the treatment
volumes provided.
Table 9: Summary of Hydrodynamic Unit(s)
SWM NYSDEC Required WQv Approved Manufactured Product Name
Required
Practice Design Flow Rate Treatment Flow Rate and
WQv (CF)
ID Variant (CFS) (MTFR) (CFS) Manufacturer
Contech
HYD-1 ALT 6,627 1.88 2.00
Cascade CS4
3.6 STEP 6 - Apply Volume and Peak Rate Control
This report presents the pre-development and post-development features and conditions associated
with the rate of surface water runoff within the study area. For both cases, the drainage patterns,
drainage structures, soil types, and ground cover types are considered in this study.
3.6.1 NYSDEC Requirements for New Development
Chapter 4 of the Design Manual requires that projects meet three separate stormwater quantity
criteria:
1. The Channel Protection (CPv) requirement is designed to protect stream channels from
erosion. This is accomplished by providing 24 hours of extended detention for the 1-year, 24-
hour storm event. The Manual defines the CPv detention time as the center of mass detention
time through each stormwater management practice.
2. The Overbank Flood Control (Qp) requirement is designed to prevent an increase in the
frequency and magnitude of flow events that exceed the bank-full capacity of a channel, and
therefore must spill over into the floodplain. This is accomplished by providing detention
storage to ensure that, at each Design Point, the post-development 10-year 24-hour peak
discharge rate does not exceed the corresponding pre-development rate.
3. The Extreme Flood Control (Qf) requirement is designed to prevent the increased risk of flood
damage from large storm events, to maintain the boundaries of the pre-development 100-year
floodplain, and to protect the physical integrity of stormwater management practices. This is
accomplished by providing detention storage to ensure that, at each Design Point, the post-
development 100-year 24-hour peak discharge rate does not exceed the corresponding pre-
development rate.
Stormwater Pollution Prevention Plan
Page 11
2241067
Page 73 of 1174
Page 74
3.6.2 Methodology
In order to demonstrate that the NYSDEC detention requirements are being met, the Design Manual
requires that a hydrologic and hydraulic analysis of the pre- and post-development conditions be
performed using the Natural Resources Conservation Service Technical Release 20 (TR-20) and
Technical Release 55 (TR-55) methodologies. HydroCAD, developed by HydroCAD Software Solutions
LLC of Tamworth, New Hampshire, is a Computer-Aided-Design (CAD) program for analyzing the
hydrologic and hydraulic characteristics of a given watershed and associated stormwater management
facilities. HydroCAD uses the TR-20 algorithms and TR-55 methods to create and route runoff
hydrographs.
HydroCAD has the capability of computing hydrographs (which represent discharge rates characteristic
of specified watershed conditions, precipitation, and geologic factors) combining hydrographs and
routing flows though pipes, streams and ponds. HydroCAD can also calculate the center of mass
detention time for various hydraulic features. Documentation for HydroCAD can be found on their
website: http://www.hydrocad.net/.
For this analysis, the watershed and drainage system was broken down into a network consisting of
three types of components as described below:
1. Subcatchment: A relatively homogeneous area of land, which produces a volume and rate of
runoff unique to that area.
2. Reach: Uniform streams, channels, or pipes that convey stormwater from one point to another.
3. Pond: Natural or man-made impoundment, which temporarily stores stormwater runoff and
empties in a manner determined by its geometry and the hydraulic structure located at its
outlets.
Subcatchments, reaches, and ponds are represented by hexagons, squares, and triangles,
respectively, on the watershed routing diagrams provided with the computations included in Appendix
D and Appendix E.
The analysis of hydrologic and hydraulic conditions and proposed stormwater management facilities,
servicing the study area, was performed by dividing the tributary watershed into relatively
homogeneous subcatchments. The separation of the watershed into subcatchments was dictated by
watershed conditions, methods of collection, conveyance, and points of discharge. Watershed
characteristics for each subcatchment were then assessed from United States Geological Service
(USGS) 7.5-minute topographic maps, aerial photographs, a topographical survey, soil surveys, site
investigations, and land use maps.
Proposed stormwater management practices were designed and evaluated in accordance with the
Design Manual and local regulatory requirements. A local IDF file was imported, and specific mass
curves were generated, in HydroCAD to evaluate the pre- and post-development stormwater runoff
characteristics for various 24-hour storm events identified in the following Table.
Stormwater Pollution Prevention Plan
Page 12
2241067
Page 74 of 1174
Page 75
Table 10: Design Events
Facility 24-hour Storm Event
Storm Sewer 10-year
1-year
Stormwater Management Practice(s) 10-year
100-year
Flood Conditions 100-year
3.6.3 Performance Summary
A comparison of the total required and provided CPv for the 1-year 24-hour storm event is shown in
the following table:
Table 11: CPv Summary
Design Point Required CPv Provided CPv
(DP) (af) (af)
1 0.20 0.36
A comparison of the pre- and post-development watershed conditions was performed for all Design
Points and storm events evaluated herein. For all Design Points and design storms, this comparison
demonstrates that the peak rate of runoff will not be increased. Therefore, the project will not have a
significant adverse impact on the adjacent or downstream properties or receiving water courses.
The results of the computer modeling used to analyze the pre- and post-development watersheds are
presented in Appendix D and Appendix E, respectively. The following Table summarizes the results of
this analysis.
Table 12: Summary of Pre- and Post-Development Peak Discharge Rates
Pre- vs. Post-Development Discharge Rate (cfs)
Design Point 10-year 24-hour storm event 100-year 24-hour storm event
(DP) Pre Post Pre Post
1 16.3 13.9 36.8 31.7
3.7 Climate Change Consideration
This report presents the consideration for future physical risks due to climate change, in accordance
with Part III.A.2 of the permit. Overall site planning, control measures and practices, conveyance
systems and detention systems were evaluated against the seven (7) physical risks identified by
NYSDEC due to climate change pursuant to the Community Risk and Resiliency Act (CRRA), 6 NYCRR
490, and associated guidance. Appendix C provides a description of each consideration, specific to
the project.
Stormwater Pollution Prevention Plan
Page 13
2241067
Page 75 of 1174
Page 76
4.0 CONSTRUCTION SEQUENCE
This project has not received written approval from the Town of West Seneca allowing the disturbance
of more than five acres of land at any one time. Therefore, if the Contractor’s construction sequence
requires the disturbance of more than five acres at any one time, written approval must be obtained
from written approval from the Town of West Seneca prior to disturbing more than five acres at once.
The “Erosion and Sediment Control Plan” and the “Erosion and Sediment Control Plan Prior to
Construction” in the accompanying drawings and waiver request identifies the major construction
activities that are the subject of this SWPPP. The order (or sequence) in which the major activities are
expected to begin is presented on the accompanying drawings, though each activity will not necessarily
be completed before the next begins. In addition, these activities could occur in a different order if
necessary to maintain adequate erosion and sediment control. If this is the case, the contractor shall
notify the Owner’s/Operator’s Engineer overseeing the implementation of the SWPPP.
The Contractor will be responsible for implementing the erosion and sediment control measures
identified on the plans. The Contractor may designate these tasks to certain subcontractors as they
see fit, but the ultimate responsibility for implementing these controls and ensuring their proper
function remains with the Contractor.
In accordance with Part III.B.c.iv. a phasing plan for the project and sequencing plans for all phases
have been provided. The plans address clearing and grubbing, excavation and grading, utility and
infrastructure installation, final stabilization, and any other construction activity at the site that will
result in soil disturbance. Refer to the plans for further information on the project phasing and
sequencing.
5.0 CONSTRUCTION-PHASE POLLUTION CONTROL
The SWPPP and accompanying plans identify the temporary and permanent erosion and sediment
control measures that have been incorporated into the design of this project. These measures will be
implemented during construction, to minimize soil erosion and control sediment transport off-site, and
after construction, to control the quality and quantity of stormwater runoff from the developed site.
Erosion control measures, designed to minimize soil loss, and sediment control measures, intended
to retain eroded soil and prevent it from reaching water bodies or adjoining properties, have been
developed in accordance with the following documents:
• NYSDEC SPDES General Permit for Stormwater Discharges From Construction Activity, Permit
No. GP-0-25-001 (effective January 29, 2025 through January 28, 2030)
• New York State Standards and Specifications for Erosion and Sediment Control, NYSDEC
(November 2016)
The SWPPP and accompanying plans outline the construction scheduling for implementing the erosion
and sediment control measures. These documents include limitations on the duration of soil exposure,
criteria and specifications for placement and installation of the erosion and sediment control
measures, a maintenance schedule, and specifications for the implementation of erosion and
sediment control practices and procedures.
Temporary and permanent erosion and sediment control measures that shall be applied during
construction generally include:
Stormwater Pollution Prevention Plan
Page 14
2241067
Page 76 of 1174
Page 77
1. Minimizing soil erosion and sedimentation by stabilization of disturbed areas and by removing
sediment from construction site discharges.
2. Preservation of existing vegetation to the greatest extent practical. Following the completion
of construction activities in any portion of the site, permanent vegetation shall be established
on all exposed soils.
3. Site preparation activities to minimize the area and duration of soil disruption.
4. Establishment of permanent traffic corridors to ensure that “routes of convenience” are
avoided.
5.1 Temporary Erosion and Sediment Control Measures
The temporary erosion and sediment control measures described in the following sections are
included as part of the construction documents.
5.1.1 Stabilized Construction Access
Prior to construction, stabilized construction access(es) will be installed, per accompanying plans, to
reduce the tracking of sediment onto public roadways.
Construction traffic must enter and exit the site at the stabilized construction access(es). The intent is
to trap dust and mud that would otherwise be carried off-site by construction traffic.
The access(es) shall be maintained in a condition, which will control tracking of sediment onto public
rights-of-way or streets. When necessary, additional aggregate will be placed atop the filter fabric to
assure the minimum thickness is maintained. All sediment and/or soil spilled, dropped, or washed
onto public rights-of-way must be removed immediately. Periodic inspection and needed maintenance
shall be provided after each substantial rainfall event.
5.1.2 Dust Control
Water trucks shall be used as needed during construction to reduce dust generated on-site. Dust
control must be provided by the Contractor(s) to a degree that is acceptable to the Owner, and in
compliance with the applicable local and state dust control requirements.
5.1.3 Temporary Soil Stockpile
Materials, such as topsoil, will be temporarily stockpiled (if necessary) on the site during the
construction process. Stockpiles shall be located in an area away from storm drainage, water bodies
and/or courses, and will be properly protected from erosion by a surrounding silt fence barrier.
5.1.4 Silt Fencing
Prior to the initiation of and during construction activities, a geotextile filter fabric (or silt fence) will be
established downgradient of all disturbed areas. These barriers may extend into non-impact areas to
provide adequate protection of adjacent lands.
Clearing and grubbing will be performed only as necessary for the installation of the sediment control
barrier. To facilitate effectiveness of the silt fencing, daily inspections and inspections immediately
after significant storm events will be performed by the Contractor(s). Maintenance of the fence will be
performed as needed.
Stormwater Pollution Prevention Plan
Page 15
2241067
Page 77 of 1174
Page 78
5.1.5 Temporary Seeding
For areas undergoing clearing, grading, and disturbance as part of construction activities, where work
has temporarily ceased, temporary soil stabilization measures must be initiated by the end of the next
business day and completed within fourteen (14) days from the date the soil disturbance activity has
temporarily ceased.
5.1.6 Manufactured Insert Inlet Protection
Install insert inlet protection beneath the grate of all catch basins, to prevent sediment from entering
the catch basins and storm sewer system. Remove sediment accumulation and repair or replace insert
as necessary to ensure proper function.
5.1.7 Filter Fabric Drop Inlet Protection
Install filter fabric or silt fence with wooden stakes at the perimeter of existing or proposed catch basins
located in lawn areas, to prevent sediment from entering the catch basins and storm sewer system.
Remove sediment accumulation and repair or replace fabric as necessary to ensure proper function.
5.1.8 Erosion Control Blanket
Erosion control blankets shall be installed in accordance with manufacturer’s requirements on all
slopes exceeding 3:1. Erosion control blankets provide temporary erosion protection, rapid vegetative
establishment, and long-term erosion resistance to shear stresses generated by high runoff flow
velocities associated with steep slopes.
5.1.9 Stone Check Dams
Stone check dams will be installed within drainage ditches to reduce the velocity of stormwater runoff,
promote settling of sediment, and reduce sediment transport off-site.
Sediment accumulated behind the stone check dam will be removed as needed to maintain flow
through the stone check dam and prevent large flows from carrying sediment over or around the dam.
Stones shall be replaced as needed to maintain the design cross section of the structures.
5.1.10 Temporary Sediment Trap
Temporary sediment traps shall be constructed to intercept sediment-laden runoff, reduce the amount
of sediment leaving the disturbed areas, and protect drainage ways, properties, and rights-of-way.
Accumulated sediment shall be removed from the trap when it reaches no greater than 50 percent of
the design capacity. Sediment shall not be placed downstream from the embankment, adjacent to a
stream, or floodplain.
Temporary sediment traps depicted on the accompanying plans have been designed to provide 3,600
CF of storage per acre of tributary watershed.
5.1.11 Temporary Diversion Swales
Temporary diversion swales shall be used to divert off-site runoff around the construction site and
divert runoff from stabilized areas around disturbed areas.
5.1.12 Dewatering Operations
Dewatering will be used to intercept sediment-laden stormwater or pumped groundwater and allow it
to settle out of the pumped discharge prior to being discharged from the site. Water from dewatering
Stormwater Pollution Prevention Plan
Page 16
2241067
Page 78 of 1174
Page 79
operations shall be treated to eliminate the discharge of sediment and other pollutants. Water
resulting from dewatering operations shall be directed to temporary sediment traps or dewatering
devices. Temporary sediment traps and dewatering bags will be provided, installed, and maintained
at downgradient locations to control sediment deposits to downstream surfaces.
5.1.13 Fiber Roll
Prior to the initiation of and during construction activities, fiber rolls (12” minimum diameter) will be
established downgradient of all disturbed areas to reduce sheet flow on slopes. These rolls may extend
into non-impact areas to provide adequate protection of adjacent lands. Spacing will conform to
NYSDEC specification for straw bale dike.
Clearing and grubbing will be performed only as necessary for the installation of the fiber rolls. To
facilitate effectiveness, daily inspections and inspections immediately after significant storm events
will be performed by the Contractor(s) and maintenance will be performed as needed.
5.2 Permanent Erosion and Sediment Control Measures
The permanent erosion and sediment control measures described in the following sections are
included as part of the construction documents.
5.2.1 Establishment of Permanent Vegetation
Disturbed areas that will be vegetated must be seeded in accordance with the contract documents.
The type of seed, mulch, and maintenance measures as described in the contract documents shall
also be followed.
Permanent soil stabilization measures must be initiated by the end of the next business day and
completed within fourteen (14) days from the date the soil disturbance activity has permanently
ceased.
Final site stabilization is achieved when all soil-disturbing activities at the site have been completed
and a uniform, perennial vegetative cover with a density of 80 percent has been established or
equivalent stabilization measures (such as the use of mulches or geotextiles) have been employed on
all unpaved areas and areas not covered by permanent structures.
5.2.2 Rock Outlet Protection
Rock outlet protection shall be installed at the locations as indicated and detailed on the
accompanying plans. The installation of rock outlet protection will reduce the velocity and energy of
water, such that the flow will not erode downstream surfaces.
5.3 Implementation Schedule for Erosion and Sediment Control Measures
Proper implementation of the outlined erosion and sediment control measures is critical to minimizing
soil erosion and controlling off-site sediment transport during construction, as well as controlling the
quality and quantity of stormwater runoff from the developed site after construction. The following
table outlines the implementation schedule for initial placement of these measures, and the duration
for which they should remain in place.
Stormwater Pollution Prevention Plan
Page 17
2241067
Page 79 of 1174
Page 80
Table 13: Implementation Schedule for Erosion and Sediment Control Measures
Erosion and Sediment
Initial Placement Duration to Remain In-Place
Control Measure
Stabilized Construction Access Upon mobilizing to site Until construction is complete
Dust Control As needed As needed
Upon delivery of materials to the
Until materials have been placed
Temporary Soil Stockpile site or excavation of on-site
or removed from the site
materials for reuse
Prior to upgradient soil Until upgradient area has achieved
Silt Fencing
disturbance permanent stabilization
Apply to any disturbed soil that will
Apply additional seed as needed
Temporary Seeding remain exposed for more than 14
for temporary stabilization
days
Existing structures: prior to
Manufactured Insert Inlet upgradient soil disturbance Until upgradient area has achieved
Protection New structures: upon installation permanent stabilization
of structure/grate
Upon completion of slope grading Prior to final grading, or kept in
Erosion Control Blanket
operations place permanently
Existing swales: upon completion
of swale reshaping
Stone Check Dams Permanent
New swales: upon completion of
swale excavation
As needed during grading Until final grading of tributary area
Temporary Sediment Trap
operations is complete
Until permanent drainage methods
As needed to divert flow around are established (i.e. closed storm
Temporary Diversion Swales
work area sewer, open conveyance swales,
etc.)
Until excavation/backfilling is
Dewatering Operations As needed during excavation
complete
Prior to upgradient soil Until upgradient area has achieved
Fiber Roll
disturbance permanent stabilization
Permanent, apply additional seed
Establishment of Permanent As soon as possible after
as needed to achieve 80%
Vegetation completion of final grading
minimum uniform coverage
During installation of tributary
Rock Outlet Protection Permanent
culverts/pipes
5.4 Other Pollutant Controls
Part I.C.1 of GP-0-25-001 prohibits discharges from construction material wastewater, pollutants
used in vehicle and equipment operation and maintenance, vehicle and equipment washing and
toxic or hazardous substances.
Stormwater Pollution Prevention Plan
Page 18
2241067
Page 80 of 1174
Page 81
The following table identifies materials and/or chemicals commonly used and/or stored on
construction sites and should be addressed in the site-specific spill prevention and response plan:
Stormwater Pollution Prevention Plan
Page 19
2241067
Page 81 of 1174
Page 82
Table 14: Common Construction Pollutants
Material/Chemical Physical Description Stormwater Pollutants Location*
Pesticides Various colored to Chlorinated Herbicides used for
(insecticides, colorless liquid, hydrocarbons, noxious weed control
fungicides, powder, pellets, or organophosphates,
herbicides, grains carbamates, arsenic
rodenticides)
Fertilizer Liquid or solid grains Nitrogen, phosphorous Newly seeded areas
Cleaning solvents Colorless, blue, or Perchloroethylene, No equipment cleaning
yellow-green liquid methylene chloride, allowed in project limits
trichloroethylene,
petroleum distillates
Asphalt Black solid Oil, petroleum distillates Streets and roofing
Concrete White solid/grey liquid Limestone, sand, pH, Curb and gutter, building
chromium construction
Curing compounds Creamy white liquid Naphtha Curb and gutter
Hydraulic oil/fluids Brown oily petroleum Mineral oil Leaks or broken hoses
hydrocarbon from equipment
Gasoline Colorless, pale brown Benzene, ethyl benzene, Secondary containment /
or pink petroleum toluene, xylene, MTBE staging area
hydrocarbon
Diesel Fuel Clear, blue-green to Petroleum distillate, oil & Secondary containment /
yellow liquid grease, naphthalene, staging area
xylenes
Kerosene Pale yellow liquid Coal oil, petroleum Secondary containment /
petroleum distillates staging area
hydrocarbon
Antifreeze/coolant Clear green/yellow Ethylene glycol, propylene Leaks or broken hoses
liquid glycol, heavy metals from equipment
(copper, lead, zinc)
Sanitary toilets Various colored liquid Bacteria, parasites, and Staging area
viruses
Construction
materials
Granular fill Various colored solids Sediment Stockpile / fill areas
Subbase course Gray/brown solid Sediment, dust Stockpile
Topsoil Brown solid Sediment Stockpile
Mulch Various colored solid Sediment, debris Staging area
Seed Brown/yellow solid Nutrients, debris Staging area
HDPE Storm Pipe Black solid Staging area
SDR-35, SDR-21 Various colored solid Staging area
PVC Pipe
Metals Frames and Gray solid Staging area
Grates
Joint Sealant Light gray viscous Polyurethane Staging area
solid
*(Area where material/chemical is used on-site)
Stormwater Pollution Prevention Plan
Page 20
2241067
Page 82 of 1174
Page 83
5.5 Construction Housekeeping Practices
During the construction phase, the Contractor(s) will implement the following measures:
5.5.1 Sediment Sweeping/Vacuuming
Any sediment that is tracked by construction vehicles or erosion onto adjacent public or private
impervious surfaces must be swept or vacuumed, utilizing self-propelled and/or walk-behind
equipment, and removed on a daily basis. Kick brooms and sweeper attachments are not an
acceptable means of sweeping. Sweeping or vacuuming should not take place while tracked sediment
is wet. If tracked sediment is compacted, the sediment must be scraped loose prior to sweeping or
vacuuming.
5.5.2 Material Stockpiles
Material resulting from clearing and grubbing operations that will be stockpiled on-site, must be
adequately protected with downgradient erosion and sediment controls.
5.5.3 Equipment Cleaning and Maintenance
The Contractor(s) will designate areas for equipment cleaning, maintenance, and repair. The
Contractor(s) and subcontractor(s) will utilize those areas. The areas will be protected by a temporary
perimeter berm.
5.5.4 Detergents
The use of detergents for large-scale washing is prohibited (i.e., vehicles, buildings, pavement
surfaces, etc.)
5.5.5 Spill Prevention and Response
A Spill Prevention and Response Plan shall be developed, for the pollutants identified in Section 5.3,
for the site by the Contractor(s) that addresses the following:
1. Reducing chance of spills
2. Stopping the source of spills
3. Containing and cleaning up spills
4. Disposing of materials contaminated by spills
5. Training personnel responsible for spill prevention/response
6. Material handling procedures
7. Material storage requirements
The plan shall detail the steps required in the event of an accidental spill and shall identify contact
names and phone numbers of people and agencies that must be notified.
The plan shall include Safety Data Sheets (SDS) for all materials to be stored on-site. All workers on-
site will be required to be trained on safe handling and spill prevention procedures for all materials
used during construction. Regular tailgate safety meetings shall be held and all workers that are
expected on the site during the week shall be required to attend.
5.5.6 Concrete Washout Areas
A temporary concrete washout area shall be provided for every project where concrete will be poured
or otherwise formed on-site and shall consist of an excavated or above-ground lined construction pit
Stormwater Pollution Prevention Plan
Page 21
2241067
Page 83 of 1174
Page 84
where concrete trucks or equipment can be washed out after their loads have been discharged. Waste
generated from concrete wash water that shall not be allowed to flow into drainage ways, inlets,
receiving waters, highway right-of-way, or any location other than the designated concrete washout
area(s). Proper signage shall be placed adjacent to the facility to designate the “Concrete Washout
Area”. Locate the facility a minimum of 100-feet from drainage swales, storm drain inlets, wetlands,
streams, and other surface waters. Prevent surface water from entering the washout area.
The hardened residue from the concrete wash areas will be disposed of in the same manner as other
non-hazardous construction waste materials. Maintenance of the washout area shall include removal
of hardened material when 75% of the storage capacity is filled, and a minimum freeboard of 12
inches shall be maintained. The Contractor will be responsible for seeing that these procedures are
followed. The project may require the use of multiple concrete washout areas based on the frequency
of concrete pours.
5.5.7 Material Storage
Construction materials shall be stored in a dedicated staging area. The staging area shall be located
in an area that prevents negative impacts of construction materials on stormwater quality.
Chemicals, paints, solvents, fertilizers, and other toxic material must be stored in waterproof
containers. Except during application, the contents must be kept in trucks or within storage facilities.
Runoff containing such material must be collected, removed from the site, treated, and disposed of at
an approved solid waste or chemical disposal facility.
6.0 INSPECTIONS, MAINTENANCE, AND REPORTING
6.1 Inspection and Maintenance Requirements
6.1.1 Pre-Construction Inspection and Certification
Prior to the commencement of construction, the Qualified Inspector/Qualified Professional shall
conduct an assessment of the site and certify that the appropriate erosion and sediment control
measures have been adequately installed and implemented. The Contractor shall contact the Qualified
Inspector/Qualified Professional once the erosion and sediment control measures have been
installed.
6.1.2 Construction Phase Inspections and Maintenance
A Qualified Inspector/Qualified Professional, as defined in Appendix A of the General Permit GP-0-25-
001, shall conduct regular site inspections between the time this SWPPP is implemented and final site
stabilization. Site inspections shall occur at an interval of at least once every seven (7) calendar days.
The purpose of site inspections is to assess performance of pollutant controls. Based on these
inspections, the Qualified Inspector/Qualified Professional will decide whether it is necessary to modify
this SWPPP, add or relocate sediment barriers, or whatever else may be needed in order to prevent
pollutants from leaving the site via stormwater runoff. The general contractor has the duty to cause
pollutant control measures to be repaired, modified, maintained, supplemented, or whatever else is
necessary in order to achieve effective pollutant control.
Examples of particular items to evaluate during site inspections are listed below. This list is not
intended to be comprehensive. During each inspection the inspector must evaluate overall pollutant
Stormwater Pollution Prevention Plan
Page 22
2241067
Page 84 of 1174
Page 85
control system performance as well as particular details of individual system components. Additional
factors should be considered as appropriate to the circumstances.
1. Locations where vehicles enter and exit the site must be inspected for evidence of off-site
sediment tracking. A stabilized construction access will be constructed where vehicles enter
and exit. This access will be maintained or supplemented as necessary to prevent sediment
from leaving the site on vehicles.
2. Sediment barriers must be inspected and, if necessary, they must be enlarged or cleaned in
order to provide additional capacity. All material from behind sediment barriers will be
stockpiled on the up slope side. Additional sediment barriers must be constructed as needed.
3. Inspections will evaluate disturbed areas and areas used for storing materials that are exposed
to rainfall for evidence of, or the potential for, pollutants entering the drainage system. If
necessary, the materials must be covered or original covers must be repaired or
supplemented. Also, protective berms must be constructed, if needed, in order to contain
runoff from material storage areas.
4. Grassed areas will be inspected to confirm that a healthy stand of grass is maintained. The
site has achieved final stabilization once all areas are covered with building foundation or
pavement, or have a stand of grass with at least 80 percent density. The density of 80 percent
or greater must be maintained to be considered as stabilized. Areas must be watered,
fertilized, and reseeded as needed to achieve this goal.
5. All discharge points must be inspected to determine whether erosion control measures are
effective in preventing significant impacts to receiving waters.
The inspection reports must be completed entirely and additional remarks should be included if
needed to fully describe a situation. An important aspect of the inspection report is the description of
additional measures that need to be taken to enhance plan effectiveness. The inspection report must
identify whether the site was in compliance with the SWPPP at the time of inspection and specifically
identify all incidents of non-compliance.
Within one (1) business day of the completion of an inspection, the Qualified Inspector/Qualified
Professional shall notify the Owner/Operator and appropriate contractor or subcontractor of any
corrective actions that need to be taken. For corrective actions not requiring engineering design, the
contractor must begin implementing corrective actions within one business day and complete the
corrective actions within five business days. For corrective actions requiring engineering design, the
engineering design process must begin within five business days and the contractor must complete
the corrective action in a reasonable time frame but no later than 60 calendar days.
In addition to the inspections performed by the Qualified Inspector/Qualified Professional, the
Contractor shall perform routine inspections that include a visual check of all erosion and sediment
control measures. All inspections and maintenance shall be performed in accordance with the
inspection and maintenance schedule provided on the accompanying plans. Sediment removed from
erosion and sediment control measures will be exported from the site, stockpiled for later use, or used
immediately for general non-structural fill.
It is the responsibility of the general contractor to assure the adequacy of site pollutant discharge
controls. Actual physical site conditions or contractor practices could make it necessary to install more
structural controls than are shown on the accompanying plans. (For example, localized concentrations
of runoff could make it necessary to install additional sediment barriers, sediment traps, etc.)
Assessing the need for additional controls and implementing them or adjusting existing controls will
be a continuing aspect of this SWPPP until the site achieves final stabilization.
Stormwater Pollution Prevention Plan
Page 23
2241067
Page 85 of 1174
Page 86
6.1.3 Temporary Suspension of Construction Activities
For construction sites where soil disturbance activities have been temporarily suspended (e.g. Winter
shutdown) and temporary stabilization measures have been applied to all disturbed areas, the
frequency of Qualified Inspector/Qualified Professional inspections can be reduced to once every 30
calendar days. Prior to reducing the frequency of inspections, the Owner/Operator shall notify the
NYSDEC Region 9 stormwater contact person and the Town of West Seneca in writing.
6.1.4 Partial Project Completion
For construction sites where soil disturbance activities have been shut down with partial project
completion, all areas disturbed as of the project shutdown date have achieved final stabilization, and
all post-construction stormwater management practices required for the completed portion of the
project have been constructed in conformance with the SWPPP and are operational, the inspections
by the Qualified Inspector/Qualified Professional can stop. Prior to the shutdown, the Owner/Operator
shall notify the NYSDEC Region 9 stormwater contact person and the Town of West Seneca in writing.
If soil disturbance activities have not resumed within two years from the date of shutdown, a Notice of
Termination (NOT) shall be properly completed and submitted to the NYSDEC.
6.1.5 Post-Construction Inspections and Maintenance
Inspections and maintenance of final stabilization measures and post-construction stormwater
management practices shall be performed in accordance with Appendix G, once all disturbed areas
are stabilized and all stormwater management systems are in place and operable.
6.2 Reporting Requirements
6.2.1 Inspection Reports
Pursuant to Part IV.C of GP-0-25-001, inspection reports shall be prepared for the duration of
construction, as outlined herein, and shall be signed by the Qualified Inspector or Qualified
Professional. A sample inspection form is provided in Appendix F.
At a minimum, each inspection report shall record the following information:
1. Permit identification number; and
2. Date and time of inspection; and
3. Name and title of person(s) performing inspection; and
4. A description of the weather and soil conditions (e.g. dry, wet, saturated) at the time of the
inspection, including the temperature at the time of the inspection; and
5. A description of the condition of the runoff at all points of discharge from the construction site.
This must include identification of any discharges of sediment from the construction site.
Include discharges from conveyance systems (i.e. pipes, culverts, ditches, etc.) and overland
flow; and
6. A description of the condition of all surface waters of the State located within, or immediately
adjacent to, the property boundaries of the construction site which receive runoff from
disturbed areas. This must include identification of any discharges of sediment to the surface
waters of the State; and
Stormwater Pollution Prevention Plan
Page 24
2241067
Page 86 of 1174
Page 87
7. Identification of all erosion and sediment control practices and pollution prevention measures
that need repair or maintenance; and
8. Identification of all erosion and sediment control practices and pollution prevention measures
that were not installed properly or are not functioning as designed and need to be reinstalled
or replaced; and
9. Description and sketch (map) of areas with active soil disturbance activity, areas that have
been disturbed but are inactive at the time of the inspection, and areas that have been
stabilized (temporary and/or final) since the last inspection; and
10. Estimates, in square feet or acres, of the following areas:
a. Total area with active soil disturbance (not requiring either temporary stabilization or
final stabilization); and
b. Total area with inactive soil disturbance (requiring either temporary stabilization or
final stabilization); and
c. Total area that has achieved temporary stabilization; and
d. Total area that has achieved final stabilization; and
11. Current stage of construction of all SMPs and identification of all construction activity on site
that is not in conformance with the SWPPP and technical standards; and
12. Corrective action(s) that must be taken to install, repair, replace or maintain erosion and
sediment control practices and pollution prevention measures; and to correct deficiencies
identified with the construction of the SMP(s); and
13. Identification and status of all corrective actions that were required by previous inspection;
and
14. Digital photographs, with date stamp, that clearly show the condition of all practices that have
been identified as needing corrective actions. The qualified inspector must attach color copies
of the digital photographs to the inspection report being maintained onsite within seven (7)
calendar days of the date of the inspection. The qualified inspector must also take digital
photographs, with date stamp, that clearly show the condition of the practice(s) after the
corrective action has been completed. The qualified inspector must attach paper color copies
of the digital photographs to the inspection report that documents the completion of the
corrective action work within seven (7) calendar days of that inspection.
6.2.2 Site Log Book
Pursuant to Part I.E.3 of GP-0-25-001, the Owner/Operator shall retain a copy of the General Permit,
NOI, NOI Acknowledgment Letter, MS4 SWPPP Acceptance Form (if applicable), inspection reports,
contractor and subcontractor certification forms, and all documentation necessary to demonstrate
eligibility under the permit, at the construction site from commencement of construction activity until
the date that all areas of disturbance have achieved final stabilization and the Notice of Termination
has been submitted to the NYSDEC.
The Site Log Book shall be maintained on-site in a secure location (i.e. job trailer, on-site construction
office, or mailbox with lock) and must be accessible during normal business hours to an individual
performing a compliance inspection.
Stormwater Pollution Prevention Plan
Page 25
2241067
Page 87 of 1174
Page 88
6.2.3 Post Construction Records and Archiving
Following construction, the Owner/Operator shall retain copies of the SWPPP, the complete
construction Site Log Book, and records of all data used to complete the NOI to be covered by this
permit, for a period of at least five years from the date that the site is finally stabilized. This period may
be extended by the NYSDEC, at its sole discretion, at any time upon written notification.
Records shall be maintained of all post construction inspections and maintenance work performed in
accordance with the requirements outlined in Appendix G.
7.0 SWPPP IMPLEMENTATION RESPONSIBILITIES
A summary of the responsibilities and obligations of all parties involved with compliance with the
NYSDEC SPDES General Permit GP-0-25-001 conditions is outlined in the subsequent sections. For a
complete listing of the definitions, responsibilities, and obligations, refer to the SPDES General Permit
GP-0-25-001 presented in Appendix J.
7.1 Owner’s/Operator's Responsibilities
1. Ensure that control measures are selected, designed, installed, implemented and maintained
to minimize the discharge of pollutants and prevent a violation of the water quality standards,
meeting the non-numeric effluent limitations in Part II.B.1.(a)-(e) of the SPDES General Permit
and in accordance with the New York State Standards and Specifications for Erosion and
Sediment Control, dated November 2016.
2. Ensure that practices are selected, designed, installed, and maintained to meet the
performance criteria in the Design Manual. Practices must be designed to meet the applicable
sizing criteria in Part II.C.2.a., b., c. or d. of GP-0-25-001.
3. Retain the services of a “Qualified Inspector” or “Qualified Professional” as defined under GP-
0-25-001, to provide the services outlined in Section 7.5 “Qualified Inspector’s/Qualified
Professional’s Responsibilities.”
4. Retain the services of a “Qualified Professional,” as defined under GP-0-25-001, to provide
the services outlined in Section 2.3 “Owner’s/Operator’s Engineers Responsibilities.”
5. Have an authorized corporate officer sign the Owner/Operator Certification Form to
accompany the eNOI. A copy of the completed NOI is included in Appendix B.
6. Submit the electronic version of the NOI (eNOI) along with the MS4 SWPPP acceptance form
using the NYSDEC’s website (http://www.dec.ny.gov/chemical/43133.html).
7. Pay the required initial and annual fees upon receipt of invoices from NYSDEC. These invoices
are generally issued in the fall of each year. The initial fee is calculated as $110.00 per acre
disturbed plus $675.00 per acre of net increase in impervious cover, and the annual fee is
$110.00.
8. Prior to the commencement of construction activity, identify the contractor(s) and
subcontractor(s) that will be responsible for installing, constructing, repairing, replacing,
inspecting, and maintaining the erosion control practices included in the SWPPP and the
Stormwater Pollution Prevention Plan
Page 26
2241067
Page 88 of 1174
Page 89
contractor(s) and subcontractor(s) that will be responsible for constructing the SMPs included
in the SWPPP. Each of the contractors and subcontractors must identify at least one person
from their company to be the trained contractor that will be responsible for implementation of
the SWPPP. Ensure that at least one trained contractor is on site daily when soil disturbance
activities are being performed.
9. Schedule a pre-construction meeting which shall include the Town of West Seneca
representative, Owner’s/Operator’s Engineer, Qualified Inspector, Contractor, and their sub-
contractors to discuss responsibilities as they relate to the implementation of this SWPPP.
10. Retain the services of an independent certified materials testing and inspection firm operating
under the direction of a licensed Professional Engineer to perform regular tests, inspections,
and certifications of the construction materials used in the construction of all post-construction
stormwater management practices.
11. Retain the services of a NYS licensed land surveyor to perform an as-built topographic survey
of the completed post-construction stormwater management facilities.
12. Require the Contractor to fully implement the SWPPP prepared for the site by the
Owner/Operator’s Engineer to ensure that the provisions of the SWPPP are implemented from
the commencement of construction activity until all areas of disturbance have achieved final
stabilization and the Notice of Termination (NOT) has been submitted to the NYSDEC.
13. The Owner/Operator is authorized to commence construction activity as of the authorization
date indicated in the Letter of Authorization (LOA), which is sent by NYSDEC after a complete
eNOI is submitted.
14. Within five (5) business days of receipt of the LOA, send an electronic copy of the LOA to the
MS4 operator(s) with review authority.
15. Forward a copy of the LOA received from DEC to the Owner’s/Operator’s Engineer for project
records, and to the Contractor for display at the construction site.
16. As of the date the LOA is received, the Owner/Operator must make the eNOI, SWPPP and LOA
available for review and copying in accordance with the requirements in Part VII.H. of GP-0-25-
001. When applicable, as of the date an updated LOA is received, the Owner/Operator must
make the updated LOA available for review and copying in accordance with the requirements
in Part VII.H.
17. The Owner/Operator must ensure compliance with all requirements of GP-0-25-001 and that
the provisions of the SWPPP, including any changes made to the SWPPP in accordance with
Part III.A.5., are properly implemented and maintained from the commencement of
construction activity until all area of disturbance have achieved final stabilization; and the
Owner/Operator’s coverage under the permit is terminated in accordance with Part V.A.5.a.
18. As of the date of the commencement of construction activities until Part I.E.2.a. and b. have
been met, the Owner/Operator must maintain at the construction site, a copy of all
documentation necessary to demonstrate eligibility with GP-0-25-001, a copy of GP-0-25-001,
the SWPPP, the signed SWPPP Preparer Certification Form, the signed MS4 SWPPP
Acceptance Form, signed Owner/Operator Certification Form, eNOI, and LOA, and LOA
transmittal to the MS4 Operator in accordance with Part I.D.3.c.
Stormwater Pollution Prevention Plan
Page 27
2241067
Page 89 of 1174
Page 90
19. The Owner/Operator must maintain at the construction site, until Part I.E.2.a and b. have been
met, as of the date the documents become final or are received, a copy of the responsible
contractor’s or subcontractor's certification statement(s) in accordance with Part III.A.7, and
inspection reports in accordance with Part IV.C.4. and 6.
20. The Owner/Operator must maintain the documents in a secure location, such as a job trailer,
on-site construction office, or mailbox with lock. The secure location must be accessible during
normal business hours to an individual performing a compliance inspection. The documents
must be paper documents unless electronic documents are accessible to the inspector during
an inspection to the same extent as a paper copy stored at the site would be. If electronic
documents are kept on site, the Owner/Operator must maintain functional equipment on site
available to an inspector during normal hours of operation such that an inspector may view
the electronic documents in a format that can be read in a similar manner as a paper record
and in a legally dependable format with no less evidentiary value than their paper equivalent.
21. Upon finding a significant non-compliance with the practices described in the SWPPP or
violation of GP-0-25-001, NYSDEC may order an immediate stop to all construction activity at
the site until the non-compliance is remedied. The stop work order must be in writing, describe
the non-compliance in detail, and be sent to the Owner/Operator. Forward a copy of any stop
work order received immediately to the Owner’s/Operator’s Engineer and to the Contractor.
22. If any human remains or archaeological remains are encountered during excavation, the
Owner/Operator must immediately cease, or cause to cease, all construction activity in the
area of the remains and notify the appropriate Regional Water Engineer (RWE). Construction
activity shall not resume until written permission to do so has been received from the RWE.
23. To be authorized to implement modifications to the information previously submitted in the
eNOI, the Owner/Operator must notify NYSDEC via email at [email protected]
requesting access to update the eNOI, update the eNOI to reflect the modifications and
resubmit the eNOI in accordance with Part I.D., and receive an updated LOA.
24. The eNOI, SWPPP, LOA, updated LOAs, and inspection reports required by GP-0-25-001 are
public documents that the Owner/Operator must make available for review and copying by any
person within five (5) business days of the Owner/Operator receiving a written request by any
such person to review these documents. Copying of documents will be done at the requester’s
expense.
25. The Owner/Operator must terminate coverage when the project reaches total project
completion, has a planned shutdown with partial project completion, is changing
Owner/Operator or has obtained coverage under an alternative general SPDES permit or an
individual SPDES permit.
26. Have a qualified inspector perform a final site inspection prior to submitting the eNOT.
27. Have the MS4 sign the MS4 Acceptance statement on the eNOT in accordance with the
requirements in Part VII.J.
28. Prior to submitting a Notice of Termination, ensure for SMP(s) that are privately owned, the
Owner/Operator has a mechanism in place that requires operation and maintenance of the
practice(s) in accordance with the operation and maintenance plan, such as a deed covenant
in the Owner/Operator’s deed of record.
Stormwater Pollution Prevention Plan
Page 28
2241067
Page 90 of 1174
Page 91
29. Submit a complete Notice of Termination form electronically using the NYSDEC eNOT.
Coverage is terminated as of the termination date indicated in the Letter of Termination (LOT),
which is sent by NYSDEC after a complete eNOT is submitted.
30. Request and receive all SWPPP records from the Owner’s/Operator’s Engineer and archive
those records, along with the LOT, for a period of at least five (5) years from the date that
NYSDEC accepts a complete NOT submitted.
31. Implement the Post-Construction Inspections and Maintenance procedures outlined in
Appendix G.
32. The Owner/Operator must keep the SWPPP current so that it at all times accurately documents
the erosion and sediment controls practices that are being used or will be used during
construction, and all post-construction stormwater management practices that will be
constructed on the site. At a minimum, the Owner/Operator shall amend the SWPPP, including
construction drawings:
a) Whenever the current provisions prove to be ineffective in minimizing pollutants in
stormwater discharges from the project site;
b) Whenever there is a change in design, construction, or operation at the construction
site that has or could have an effect on the discharge of pollutants; and
c) To address issues or deficiencies identified during an inspection by the “Qualified
Inspector,” the Department, or other Regulatory Authority.
d) To document the final construction conditions.
33. When property ownership changes or when there is a change in operational control over the
construction plans and specifications, the original owner or operator must notify the new owner
or operator, in writing, of the requirement to obtain permit coverage by submitting a NOI with
the Department, in conformance with Part I.G.. For construction activities subject to the
requirements of a regulated, traditional land use control MS4, the original owner or operator
must also notify the MS4, in writing, of the change in ownership at least 30 calendar days prior
to the change in ownership.
7.2 Owner’s/Operator’s Engineer’s Responsibilities
1. Prepare the SWPPP using good engineering practices, best management practices, and in
compliance with all federal, state, and local regulatory requirements.
2. Prepare the electronic Notice of Intent (eNOI) (see Appendix B) and sign the “SWPPP Preparer
Certification Form.” Forward the Owner/Operator Certification Form to the Owner/Operator for
signature.
3. Provide copies of the SWPPP to the Town of West Seneca once all signatures and attachments
are complete.
4. Enter Contractor’s information in Section 7.5 “SWPPP Participants” once a Contractor is
selected by the Owner/Operator.
5. Participate in a pre-construction meeting which shall include the Town of West Seneca
representative, Owner/Operator, Qualified Inspector, Contractor, and all subcontractors to
discuss responsibilities as they relate to the implementation of this SWPPP.
Stormwater Pollution Prevention Plan
Page 29
2241067
Page 91 of 1174
Page 92
6. Update the SWPPP each time there is a significant modification to the pollution prevention
measures or a change of the principal Contractor working on the project who may disturb site
soil.
7.3 Contractor's Responsibilities
1. Sign the SWPPP Contractor's Certification Form contained within Appendix B and forward to
the Owner’s/Operator’s Engineer for inclusion in the Site Log Book.
2. Identify at least one Trained Contractor that will be responsible for implementation of this
SWPPP. Ensure that at least one Trained Contractor is on site on a daily basis when soil
disturbance activities are being performed. The Trained Contractor shall inspect the erosion
and sediment control practices and pollution prevention measures being implemented within
the active work area daily to ensure that they are being maintained in effective operating
conditions at all times. For corrective actions not requiring engineering design, the contractor
must begin implementing corrective actions within one business day and complete the
corrective actions within five business days. For corrective actions requiring engineering
design, the engineering design process must begin within five business days and the
contractor must complete the corrective action in a reasonable time frame but no later than
60 calendar days.
3. Provide the names and addresses of all subcontractors working on the project site. Require all
subcontractors who will be involved with construction activities that will result in soil
disturbance to identify at least one Trained Contractor that will be on site on a daily basis when
soil disturbance activities are being performed; and to sign a copy of the Subcontractor’s
Certification Form contained within Appendix B, then forward to the Owner’s/Operator’s
Engineer for inclusion into the Site Log Book. This information must be retained as part of the
Site Log Book.
4. Maintain a Spill Prevention and Response Plan in accordance with requirements outlined in
Section 5 of this SWPPP. This plan shall be provided to the Owner’s/Operator’s Engineer for
inclusion in the Site Log Book, prior to mobilization on-site.
5. Participate in a pre-construction meeting which shall include the Town of West Seneca
representative, Owner/Operator, Owner’s/Operator’s Engineer, Qualified Inspector, and all
subcontractors to discuss responsibilities as they relate to the implementation of this SWPPP.
6. If Contractor plans on utilizing adjacent properties for material, waste, borrow, or equipment
storage areas, or if Contractor plans to engage in industrial activity other than construction
(such as operating asphalt and/or concrete plants) at the site, Contractor shall submit
appropriate documentation to the Owner’s/Operator’s Engineer so that the SWPPP can be
modified accordingly.
7. Implement site stabilization, erosion and sediment control measures, and other requirements
of the SWPPP.
8. In accordance with the requirements in the most current version of the NYS Standards and
Specifications for Erosion and Sediment Control, conduct inspections of erosion and sediment
control measures installed at the site to ensure that they remain in effective operating
condition at all times. Prepare and retain written documentation of inspections as well as of
Stormwater Pollution Prevention Plan
Page 30
2241067
Page 92 of 1174
Page 93
all repairs/maintenance activities performed. This information must be retained as part of the
Site Log Book.
9. Begin implementing corrective actions within one (1) business day of receipt of notification by
the Qualified Inspector/Qualified Professional of any corrective actions. For corrective actions
not requiring engineering design, the contractor must begin implementing corrective actions
within one business day and complete the corrective actions within five business days. For
corrective actions requiring engineering design, the engineering design process must begin
within five business days and the contractor must complete the corrective action in a
reasonable time frame but no later than 60 calendar days.
10. Maintain a record of the date(s) and location(s) that soil restoration is performed in accordance
with the accompanying plans and NYSDEC Division of Water’s publication “Deep-Ripping and
Decompaction,” dated April 2008. A copy of this publication is provided in Appendix H. The
record that is to be maintained shall be a copy of the overall site grading plan delineating the
area(s) and date(s) that the soil was restored.
11. Upon completion of all construction at the site, the contractor responsible for overall SWPPP
Compliance shall sign the certification on their Contractor Certification Form indicating that:
a.) all temporary erosion and sediment control measures have been removed from the site, b.)
the on-site soils disturbed by construction activity have been restored in accordance with the
SWPPP and the NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction,”
and c.) all permanent stormwater management practices required by the SWPPP have been
installed in accordance with the contract documents.
7.4 Qualified Inspector’s/Qualified Professional’s Responsibilities
1. Participate in a pre-construction meeting with the Town of West Seneca representative,
Owner/Operator, Owner/Operator’s Engineer, Contractor, and their subcontractors to discuss
responsibilities as they relate to the implementation of this SWPPP.
2. Conduct an initial assessment of the site prior to the commencement of construction and
certify in an inspection report that the appropriate erosion and sediment control measures
described within this SWPPP have been adequately installed and implemented to ensure
overall preparedness of the site.
3. Provide on-site inspections to determine compliance with the SWPPP. Site inspections shall
occur at an interval of at least once every seven calendar days. A written inspection report
shall be provided to the Owner/Operator and general contractor within one business day of
the completion of the inspection, with any deficiencies identified. A sample inspection form is
provided in Appendix F.
4. Prepare an inspection report subsequent to each and every inspection that shall
include/address the items listed in Part IV.C.4 of GP-0-25-001. Sign all inspection reports and
maintain on site with the SWPPP.
5. Notify the owner/operator and appropriate contractor or subcontractor of any corrective
actions that need to be taken.
Stormwater Pollution Prevention Plan
Page 31
2241067
Page 93 of 1174
Page 94
6. Prepare a construction Site Log Book to be used as a record of all inspection reports generated
throughout the duration of construction. Ensure that the construction Site Log Book is
maintained and kept up-to-date throughout the duration of construction.
7. Review the Contractor’s SWPPP records on a periodic basis to ensure compliance with the
requirements for daily reports, soil restoration, inspections, and maintenance logs.
8. Based on the as-built survey and material testing certifications performed by others, the
Qualified Professional shall perform evaluations of the completed stormwater management
practices to determine whether they were constructed in accordance with this SWPPP.
9. The Qualified Professional shall conduct a final site assessment and prepare a certification
letter to the Owner/Operator indicating that, upon review of the material testing and inspection
reports prepared by the firm retained by the Owner/Operator, review of the completed
topographic survey, and evaluation of the completed stormwater management facilities, the
stormwater management facilities have been constructed substantially in accordance with the
contract documents and should function as designed.
10. Prepare the Notice of Termination (NOT). The Qualified Professional shall sign the NOT
Certifications VI (Final Stabilization) and VII (Post-construction Stormwater Management
Practices) and forward the NOT to the Owner/Operator for signature on Certification VIII
(Owner/Operator Certification).
11. The owner’s or operator’s coverage is terminated as of the termination date indicated in the
Letter of Termination (LOT), which is sent by NYSDEC after a complete eNOT is submitted.
12. Transfer the SWPPP documents, along with all NOI's, LOA, permit certificates, NOT's, LOT,
construction Site Log Book, and written records required by the General Permit to the
Owner/Operator for archiving.
Stormwater Pollution Prevention Plan
Page 32
2241067
Page 94 of 1174
Page 95
7.5 SWPPP Participants
1. Owner’s/Operator’s Engineer 3: Kristopher Winkler, PE
LaBella Associates, DPC
300 Pearl Street, Suite 130
Buffalo, NY 14202
Phone: (716) 483-3153
2. Owner/Operator 4: Home Leasing
75 South Clinton Avenue, Suite 700,
Rochester, NY 14604
Phone: 585-262-6210
3. Contractor5,6: Name and Title:
Company Name:
Mailing Address:
Phone:
Fax:
3
Refer to Appendix B for the SWPPP Preparer Certification Form.
4
Refer to Appendix B for the Owner/Operator Certification Form.
5
Refer to Appendix B for Contractor and Subcontractor Certification Form.
6
Contractor’s information to be entered once the Contractor has been selected.
Stormwater Pollution Prevention Plan
Page 33
2241067
Page 95 of 1174
Page 96
Page 96 of 1174
Page 97
Appendix A :
FIGURES
A-1: Site Location Map
A-2: Soils Map
A-3: Historic Places Screening Map
A-4: Environmental Resource Map
A-5: Environmental Review Documentation
A-6: FEMA Firm Map
A-7: Pre-Development Watershed Delineation Map
A-8: Post-Development Watershed Delineation Map
Page 97 of 1174
Page 98
Page 98 of 1174
Page 99
HARLEM ROAD
D
R OA
EK
RE
G AC
YU
CA
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
PROJECT LOCATION
cts\92100-92199\92112.00 - CONFIDENTIAL - WOH Gross Wetland Violation\DWG\9
CLIN
TON
STR
EET
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:40 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SITE LOCATION MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-1
Page 99 of 1174
Page 100
Page 100 of 1174
Page 101
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:42 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS MAP 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2a
Page 101 of 1174
Page 102
Page 102 of 1174
Page 103
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appen
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:43 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS LEGEND -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2b
Page 103 of 1174
Page 104
Page 104 of 1174
Page 105
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:45 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS TABLE -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2c
Page 105 of 1174
Page 106
Page 106 of 1174
Page 107
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
Missing or invalid reference It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:45 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
SWPPP FIGURE - NOT FOR CONSTRUCTION
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
File: ..\references\A-3 Historic Places Screening Map (CRIS)\Titleblock - 8
DRAWING NAME:
date of such alteration, and a specific description of the alteration.
DRAWN BY: DATE: PROJECT NO.:
HISTORIC PLACES SCREENING MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-3
Page 107 of 1174
Page 108
Page 108 of 1174
Page 109
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:47 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
ENVIRONMENTAL RESOURCE MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-4
Page 109 of 1174
Page 110
Page 110 of 1174
Page 111
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appen
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:50 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
FEMA FIRM MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-5
Page 111 of 1174
Page 112
Page 112 of 1174
Page 113
Page 113 of 1174
Page 114
Page 114 of 1174
Page 115
Page 115 of 1174
Page 116
Page 116 of 1174
Page 117
Page 117 of 1174
Page 118
Page 118 of 1174
Page 119
AP-1
593.19
594.95
594.92 602.49
602.51
ES-1
ES-2
DS
DS
600.04
FLAG
POLE
MB
LEGEND
SUBCATCHMENT BOUNDARY
Tc PATH
# SUBCATCHMENT
# REACH
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:59:33 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and SWPPP FIGURE - NOT FOR CONSTRUCTION
N DRAWING NAME:
date of such alteration, and a specific description of the alteration.
DRAWN BY: DATE: PROJECT NO.:
PRE-DEVELOPMENT WATERSHED DELINEATION MAP 04/20/2026 2241067
VERSION 21.1
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2026 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON STREET, BUFFALO, NY 14224
A-6
Page 119 of 1174
Page 120
Page 120 of 1174
Page 121
AP-1
593.19
600.14
PS-7 599
600
601
PS-1
594.92 599 602.51
600
599
598
60
600
598
599
599
600
600
597
09098
597
598
599
1
600
6559
60
0
600
PS-6
600
600
598
599
599
600
600
595
596
597
598
600
600
PS-5
599
600599
FFE=600.75'
55 98765
600
60909
59
600 600
60
600
0
599
599
600
599
PS-2 599
59
599
9
599 599
599
595
596
598
597
600
600
598
599
598
599
599
DS
600
PS-3
DS
559998778
600
559
559999876
00 5599678
6
600
PS-4
59 559998766 PS-8
59
9 5599789 599.84
9
598
59 8
7 5
5965
59
595
598.87 9
59678
59 59
99
55595678
559 9998765
598
LEGEND
606.31 607.17
SUBCATCHMENT BOUNDARY
Tc PATH
# SUBCATCHMENT
# REACH
POND
#
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 11:02:52 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
N altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
POST-DEVELOPMENT WATERSHED DELINEATION MAP 04/20/2026 2241067
VERSION 21.1
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2026 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON STREET, BUFFALO, NY 14224
A-7
Page 121 of 1174
Page 122
Page 122 of 1174
Page 123
Appendix B :
FORMS
Notice of Intent (NOI) Draft
MS4 SWPPP Acceptance Form
SWPPP Preparer Certification Form
Owner/Operator Certification Form
Contractor and Subcontractor Certification Forms
Notice of Termination (NOT)
Page 123 of 1174
Page 124
Page 124 of 1174
Page 125
MS4 SWPPP Acceptance Form
for construction activities seeking authorization under the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI
and submitted to NYSDEC electronically.)
I. Project Owner/Operator Information
1. Owner/Operator Name:
2. Contact Person:
3. Street Address:
4. City/State/Zip:
II. Project Site Information
5. Project/Site Name:
6. Street Address:
7. City/State/Zip:
III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance Information
8. SWPPP Reviewed by:
9. Title/Position:
10. Date Final SWPPP Reviewed and Accepted:
IV. Regulated MS4 Information
11. Name of MS4 Operator:
12. MS4 SPDES Permit Identification Number: NYR20A
13. Street Address:
14. City/State/Zip:
15. Telephone Number:
Page 1 of 2
Page 125 of 1174
Page 126
MS4 SWPPP Acceptance Form - continued
V. Certification Statement - MS4 Official (principal executive officer or ranking elected official) or
Duly Authorized Representative
I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project
identified in section II. of this form has been reviewed and meets the substantive requirements in the
SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP).
Note: The MS4 Operator, through the acceptance of the SWPPP, assumes no responsibility for the
accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of
the SWPPP by the MS4 Operator does not relieve the owner/operator or their SWPPP preparer of
responsibility or liability for errors or omissions in the plan.
Printed Name1:
Title/Position:
Signature:
Date:
VI. Additional Information
1 Printed name of the principal executive officer or ranking elected official for the MS4 Operator or their
duly authorized representative in accordance with CGP Part VII.J.2.
(NYSDEC - MS4 SWPPP Acceptance Form - January 2025)
Page 2 of 2
Page 126 of 1174
Page 127
SWPPP Preparer Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and
submitted to NYSDEC electronically.)
Project/Site Name:
eNOI Submission ID:
Owner/Operator Name:
Certification Statement – SWPPP Preparer
I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) has been
prepared in accordance with the requirements of GP-0-25-001. I certify under penalty
of law that the SWPPP and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge
and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
SWPPP Preparer First Name MI SWPPP Preparer Last Name
Signature Date
Revised: January 2025
Page 127 of 1174
Page 128
Owner/Operator Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b. or Part I.F.2. and 3., the completed form must be attached to the eNOI or the
Request to Continue Coverage, and submitted to NYSDEC electronically.
Project/Site Name: ________________________________________________________
eNOI Submission ID: _________________________________________________
eNOI Submitted by: Owner/Operator SWPPP Preparer Other
Certification Statement - Owner/Operator
I hereby certify that I read, and will comply with, the GP-0-25-001 permit requirements. I understand that
authorization to discharge under the permit for the project/site named above is dependent on receipt of a
Letter of Authorization (LOA) or a Letter of Continued Coverage (LOCC) from the New York State
Department of Environmental Conservation (NYSDEC) in accordance with CGP Part I.D.3.b. or Part I.F.4.
I am aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.
Owner/Operator First Name MI Owner/Operator Last Name
___________________________________________________________
Signature
________________________________
Date
Revised: January 2025
Page 128 of 1174
Page 129
Stormwater Pollution Prevention Plan
Contractor Certification Statement
(Responsible for overall SWPPP Compliance)
West Seneca
Town of West Seneca, Erie County, New York
This is to certify that the following contracting firm will be responsible for installing, constructing, repairing, inspecting and/or
maintaining the erosion and sediment control practices and post-construction stormwater management control practices
required by the SWPPP.
Contracting Firm Information
Name:
Address:
Telephone & Fax:
Trained Contractor(s) 1 Responsible for SWPPP Implementation (Provide name, title, and date of last training)
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
Prior to commencement of construction activity, the following certification shall be issued:
I hereby certify under penalty of law that I understand and agree to comply with the requirements of the SWPPP and agree to
implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner
or operator must comply with the requirements of the most current version of the New York State Pollutant Discharge
Elimination System (SPDES) Construction General Permit (CGP) for Stormwater Discharges from Construction Activities and
that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that
there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine
and imprisonment for knowing violations
Printed Name:
Title/Position:
Signature: Date:
Upon completion of construction activities, the following certification shall be issued, prior to issuance of the NOT:
I hereby certify that that all permanent stormwater management practices required by the SWPPP have been installed in
accordance with the contract documents. I further certify that all temporary erosion and sediment control measures have
been removed from the site, and that the on-site soils disturbed by construction activity have been restored in accordance
with the SWPPP and the NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction”.
Printed Name:
Title/Position:
Signature: Date:
1 “Trained Contractor” means an employee from a contracting (construction) company that has received four (4) hours of Department endorsed training in proper erosion and sediment
control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the “trained contractor” shall receive four (4)
hours of training every three (3) years. It can also mean an employee from the contracting (construction) company that meets the “qualified inspector” qualifications (e.g. licensed
Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registe red Landscape Architect, provided they
have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil an d Water Conservation District, or other Department
endorsed entity). The “Trained Contractor” will be responsible for the day to day implementation of the SWPPP.
Page 129 of 1174
Page 130
Stormwater Pollution Prevention Plan
Subcontractor Certification Statement
(whose work involves soil disturbance)
West Seneca
Town of West Seneca, Erie County, New York
Each Subcontractor whose work will involve soil disturbance of any kind is required to complete and sign this Certification
Statement before commencing any construction activity at the site. This completed Certification Statement(s) shall be
maintained at the construction site in the Site Log Book.
Subcontracting Firm Information
Name:
Address:
Telephone & Fax:
Trained Contractor(s) 2 Responsible for SWPPP Implementation (Provide name, title, and date of last training)
Prior to commencement of construction activities, the following certification shall be issued:
I hereby certify under penalty of law that I understand and agree to comply with the requirements of the SWPPP and agree to
implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner
or operator must comply with the requirements of the most current version of the New York State Pollutant Discharge
Elimination System (SPDES) Construction General Permit (CGP) for Stormwater Discharges from Construction Activities and
that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that
there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine
and imprisonment for knowing violations
Printed Name:
Title/Position:
Signature: Date:
2 “Trained Contractor” means an employee from a contracting (construction) company that has received four (4) hours of Department endorsed training in proper erosion and sediment
control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the “trained contractor” shall receive four (4)
hours of training every three (3) years. It can also mean an employee from the contracting (construction) company that meets the “qualified inspector” qualifications (e.g. licensed
Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registe red Landscape Architect, provided they
have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil an d Water Conservation District, or other Department
endorsed entity). The “Trained Contractor” will be responsible for the day to day implementation of the SWPPP.
Page 130 of 1174
Page 131
eNOT Owner or Operator Certification
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I certify that I have met the requirements of CGP Part V.A.1., 2., 3., and 4. I certify under
penalty of law that this document and all attachments were prepared under my direction
or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for
knowing violations.
a. Printed name of the Owner or Operator:
b. Title/Position:
c. Signature:
d. Date:
Page 131 of 1174
Page 132
eNOT Qualified Inspector Certification – Final Stabilization
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.i., ii., and iii. or CGP Part
V.A.1.b.i., ii., and iii. have been achieved. I certify under penalty of law that this
document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting
false information, including the possibility of fine and imprisonment for knowing
violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 132 of 1174
Page 133
eNOT Qualified Inspector Certification – SMPs
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.iv. or CGP Part V.A.1.b.iv.
have been achieved. I certify under penalty of law that this document and all
attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 133 of 1174
Page 134
Page 134 of 1174
Page 135
Appendix c:
Project evaluation and
design calculations
Page 135 of 1174
Page 136
Page 136 of 1174
Page 137
P= 1.00 inch
Total Area Existing Imperv Proposed Imperv Existing Disturbed Imperv Reduction
AREA
(Acres) (Acres) (Acres) Imperv Area (Acres) (Acres)
TO ALTERNATIVE PRACTICES 2.13 0.47 1.91 0.47 0%
TO AREA REDUCTION SMPS
SITE REMAINING AREA 3.55 0.59 1.07 0.35 0%
TOTAL SITE 5.68 1.06 2.98 0.82 0%
Water Quality Volume Calculation
Exist Disturbed Imperv Imperv Area (NEW Percent TOTAL WQV
Total Area WQv WQv Adjusted
New Development / Redevelopment WQv Treatment % Area (REDEVELOPMENT) DEVELOPMENT) Impervious Rv REQUIRED System Generated Notes
(Acres) (ft 3 ) (ft 3 )
(Acres) (Acres) % (ft 3 )
REDEVELOPMENT ALTERNATIVE 75% 0.47 0.47 - 100% 0.95 1,621 1,216
NEW DEVELOPMENT ALTERNATIVE 100% 1.66 - 1.44 87% 0.83 5,006 5,006
8,672
REDEVELOPMENT REMAINING AREA 25% 0.35 0.35 - 100% 0.95 1,207 302
NEW DEVELOPMENT REMAINING AREA 100% 3.20 - 0.48 15% 0.19 2,149 2,149
Minimum Runoff Reduction Volume Calculation
Total Impervious Area Added Percent MINIMUM RRv
Weighted S
AREA (NEW DEVELOPMENT) Soil Group A % Soil Group B % Soil Group C % Soil Group D % Impervious Rv REQUIRED System Generated Notes
Factor 3
(Acres) % (ft )
TOTAL SITE 1.92 0% 0% 0% 100% 100% 0.95 0.20 1,324
Page 137 of 1174
Page 138
Page 138 of 1174
Page 139
Step 2 - Calculate Water Quality Volume
Is this project subject to Section 4.3 of the NYS Design Manual for Enhanced Phosphorus
Removal? No
What is the nature of this construction project? Redevelopment with increase in impervious area
Design Point: 1
Enter 90% Rainfall Event as P
P= 1.00 inches
Calculate Required WQv
Contributing Percent
Drainage Area Impervious Area WQv SMP
Area Impervious Rv
Number (Acres) (cf) Description
(Acres) %
Filtration
1 0.63 0.22 34 0.36 817
Bioretention
Flow Based
2 1.70 1.48 87 0.83 5,144 Alternative
Practice
Filtration
3 0.65 0.22 33 0.35 829
Bioretention
Filtration
4 0.68 0.48 71 0.69 1,692
Bioretention
Flow Based
5 0.43 0.43 100 0.95 1,483 Alternative
Practice
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Total 4.09 2.82 69 0.67 9964 Required WQv
Page 139 of 1174
Page 140
Page 140 of 1174
Page 141
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
1 0.63 0.22 34 0.36 817 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 340 sf
Enter Provided Filter Area Af 340 sf
Recalculated Water Quality Volume (based on
WQv calc 816 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 326 cf
This is the portion of the WQv that is not reduced in
WQv Treated 491 cf
the practice.
Page 141 of 1174
Page 142
Page 142 of 1174
Page 143
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
3 0.65 0.22 33 0.35 829 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 345 sf
Enter Provided Filter Area Af 348 sf
Recalculated Water Quality Volume (based on
WQv calc 835.2 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 334 cf
This is the portion of the WQv that is not reduced in
WQv Treated 495 cf
the practice.
Page 143 of 1174
Page 144
Page 144 of 1174
Page 145
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
4 0.68 0.48 71 0.69 1,692 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 705 sf
Enter Provided Filter Area Af 705 sf
Recalculated Water Quality Volume (based on
WQv calc 1692 cf
provided filter area)
Calculate Runoff Reduction
RRv Provided 677 cf
This is the portion of the WQv that is not reduced in
WQv Treated 1015 cf
the practice.
Page 145 of 1174
Page 146
Page 146 of 1174
Page 147
Water Quality Peak Flow Calclations
NYSDEC Water Quality Volume (WQv) & Water Quality Peak Flow (Qp) Calculation
Worksheet (REQUIRED Qp)
PROJECT INFORMATION
Total Drainage Area A: 2.09 ac
Impervious Area I: 1.90 ac
Percent Impervious 90.9 %
NYSDEC 90% Rainfall P: 1.00 in.
Time of Concentration Tc: 0.27 hrs
Rv: 0.87
WATER QUALITY VOLUME
Water Quality Volume WQv=([(P)*(Rv)*(A)]/12)*43560 WQv: 6,587 cf
WATER QUALITY PEAK FLOW (NEW DEVELOPMENT)
Runoff Volume Q=WQv/(A*3600) Q: 0.87 in.
2 ½
CN=1000/(10+5*P+10*Q-10(Q +1.25*Q*P) ) CN: 98.80
CN Rounded CN: 99
CN < or = 98 CN: 98
Initial Abstraction (Ia=200/CN-2) Ia: 0.04 in.
RATIO R=Ia/P R: 0.04
2
C0 = A*R +B*R +C C0: 2.54
2
C1 = A*R +B*R +C C1: -0.58
2
C2 = A*R +B*R +C C2: -0.17
2
Unit Peak Discharge qu=10^(C0+C1*Log(Tc)+C2*(log(Tc)) ) qu: 663.03 cfs/mi2/in
Water Quality Peak Flow Qp=qu*A*Q/640 (100%) Qp: 1.88 cfs
REDVELOPMENT
Impeverious Area Reduction IC 0.00 %
WQv Treatment by Standard Practice SP 0.00 %
Runoff Reduction RR 0.00 %
Req. WQv% By Alt. Practice AP=(25-(% IC+%SP+%RR))*3: AP 75.0 %
Required Water Quality Peak Flow RD QP=(Qp*AP): RD Qp: 1.41 cfs
Page 1 of 1
Page 147 of 1174
Page 148
Page 148 of 1174
Page 149
Appendix d:
Pre-development stormwater
modeling
Page 149 of 1174
Page 150
Page 150 of 1174
Page 151
ES-1
W Site
AP-1
Cayuga Creek
ES-2
E Site
Subcat Reach Pond Link Routing Diagram for D_App D_Pre-Development Model
Prepared by Labella Associates, Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC
Page 151 of 1174
Page 152
Page 152 of 1174
Page 153
D_App D_Pre-Development Model
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing (selected events)
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-yr NY-West Seneca 24-hr S1 1-yr Default 24.00 1 1.82 2
2 10-yr NY-West Seneca 24-hr S1 10-yr Default 24.00 1 3.14 2
3 100-yr NY-West Seneca 24-hr S1 100-yr Default 24.00 1 5.22 2
Page 153 of 1174
Page 154
D_App D_Pre-Development Model
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (selected nodes)
Area CN Description
(acres) (subcatchment-numbers)
10.061 80 >75% Grass cover, Good, HSG D (ES-1, ES-2)
1.056 98 Paved parking, HSG D (ES-1, ES-2)
11.117 82 TOTAL AREA
Page 154 of 1174
Page 155
D_App D_Pre-Development Model
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (selected nodes)
Area Soil Subcatchment
(acres) Group Numbers
0.000 HSG A
0.000 HSG B
0.000 HSG C
11.117 HSG D ES-1, ES-2
0.000 Other
11.117 TOTAL AREA
Page 155 of 1174
Page 156
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 5
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=0.53"
Flow Length=391' Tc=14.0 min CN=82 Runoff=4.22 cfs 0.344 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=0.49"
Flow Length=390' Tc=19.4 min CN=81 Runoff=1.42 cfs 0.139 af
Reach AP-1: Cayuga Creek Inflow=5.48 cfs 0.483 af
Outflow=5.48 cfs 0.483 af
Total Runoff Area = 11.117 ac Runoff Volume = 0.483 af Average Runoff Depth = 0.52"
90.50% Pervious = 10.061 ac 9.50% Impervious = 1.056 ac
Page 156 of 1174
Page 157
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 6
Summary for Subcatchment ES-1: W Site
Runoff = 4.22 cfs @ 12.16 hrs, Volume= 0.344 af, Depth= 0.53"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
Runoff
4.22 cfs
NY-West Seneca 24-hr S1 1-yr
4
Rainfall=1.82"
Runoff Area=337,194 sf
Runoff Volume=0.344 af
3
Runoff Depth=0.53"
Flow (cfs)
Flow Length=391'
Tc=14.0 min
2
CN=82
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 157 of 1174
Page 158
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment ES-2: E Site
Runoff = 1.42 cfs @ 12.25 hrs, Volume= 0.139 af, Depth= 0.49"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
1.42 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
Runoff Area=147,058 sf
Runoff Volume=0.139 af
1
Runoff Depth=0.49"
Flow (cfs)
Flow Length=390'
Tc=19.4 min
CN=81
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 158 of 1174
Page 159
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Reach AP-1: Cayuga Creek
Inflow Area = 11.117 ac, 9.50% Impervious, Inflow Depth = 0.52" for 1-yr event
Inflow = 5.48 cfs @ 12.18 hrs, Volume= 0.483 af
Outflow = 5.48 cfs @ 12.18 hrs, Volume= 0.483 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
5.48 cfs Outflow
6 5.48 cfs
Inflow Area=11.117 ac
5
4
Flow (cfs)
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 159 of 1174
Page 160
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 9
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=1.49"
Flow Length=391' Tc=14.0 min CN=82 Runoff=12.32 cfs 0.961 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=1.42"
Flow Length=390' Tc=19.4 min CN=81 Runoff=4.40 cfs 0.400 af
Reach AP-1: Cayuga Creek Inflow=16.27 cfs 1.361 af
Outflow=16.27 cfs 1.361 af
Total Runoff Area = 11.117 ac Runoff Volume = 1.361 af Average Runoff Depth = 1.47"
90.50% Pervious = 10.061 ac 9.50% Impervious = 1.056 ac
Page 160 of 1174
Page 161
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment ES-1: W Site
Runoff = 12.32 cfs @ 12.15 hrs, Volume= 0.961 af, Depth= 1.49"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
Runoff
13 12.32 cfs
12 NY-West Seneca 24-hr S1 10-yr
11 Rainfall=3.14"
10
Runoff Area=337,194 sf
Runoff Volume=0.961 af
9
Runoff Depth=1.49"
8
Flow (cfs)
Flow Length=391'
7
Tc=14.0 min
6
CN=82
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 161 of 1174
Page 162
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment ES-2: E Site
Runoff = 4.40 cfs @ 12.23 hrs, Volume= 0.400 af, Depth= 1.42"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
4.40 cfs
NY-West Seneca 24-hr S1 10-yr
4 Rainfall=3.14"
Runoff Area=147,058 sf
Runoff Volume=0.400 af
3 Runoff Depth=1.42"
Flow (cfs)
Flow Length=390'
Tc=19.4 min
2 CN=81
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 162 of 1174
Page 163
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 12
Summary for Reach AP-1: Cayuga Creek
Inflow Area = 11.117 ac, 9.50% Impervious, Inflow Depth = 1.47" for 10-yr event
Inflow = 16.27 cfs @ 12.17 hrs, Volume= 1.361 af
Outflow = 16.27 cfs @ 12.17 hrs, Volume= 1.361 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
18 16.27 cfs Outflow
16.27 cfs
17
16
Inflow Area=11.117 ac
15
14
13
12
11
Flow (cfs)
10
9
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 163 of 1174
Page 164
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 13
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=3.28"
Flow Length=391' Tc=14.0 min CN=82 Runoff=27.59 cfs 2.114 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=3.18"
Flow Length=390' Tc=19.4 min CN=81 Runoff=10.17 cfs 0.895 af
Reach AP-1: Cayuga Creek Inflow=36.80 cfs 3.008 af
Outflow=36.80 cfs 3.008 af
Total Runoff Area = 11.117 ac Runoff Volume = 3.008 af Average Runoff Depth = 3.25"
90.50% Pervious = 10.061 ac 9.50% Impervious = 1.056 ac
Page 164 of 1174
Page 165
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 14
Summary for Subcatchment ES-1: W Site
Runoff = 27.59 cfs @ 12.15 hrs, Volume= 2.114 af, Depth= 3.28"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
30 Runoff
27.59 cfs
28
NY-West Seneca 24-hr S1 100-yr
26
Rainfall=5.22"
24
Runoff Area=337,194 sf
22
Runoff Volume=2.114 af
20
Runoff Depth=3.28"
18
Flow Length=391'
Flow (cfs)
16
Tc=14.0 min
14
CN=82
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 165 of 1174
Page 166
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 15
Summary for Subcatchment ES-2: E Site
Runoff = 10.17 cfs @ 12.22 hrs, Volume= 0.895 af, Depth= 3.18"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
11 10.17 cfs
10 NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
9
Runoff Area=147,058 sf
8 Runoff Volume=0.895 af
7 Runoff Depth=3.18"
Flow Length=390'
Flow (cfs)
6
Tc=19.4 min
5 CN=81
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 166 of 1174
Page 167
D_App D_Pre-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 16
Summary for Reach AP-1: Cayuga Creek
Inflow Area = 11.117 ac, 9.50% Impervious, Inflow Depth = 3.25" for 100-yr event
Inflow = 36.80 cfs @ 12.16 hrs, Volume= 3.008 af
Outflow = 36.80 cfs @ 12.16 hrs, Volume= 3.008 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
36.80 cfs Outflow
40 36.80 cfs
38
36
Inflow Area=11.117 ac
34
32
30
28
26
24
Flow (cfs)
22
20
18
16
14
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 167 of 1174
Page 168
D_App D_Pre-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 17
Events for Subcatchment ES-1: W Site
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 4.22 0.344 0.53
10-yr 3.14 12.32 0.961 1.49
100-yr 5.22 27.59 2.114 3.28
Page 168 of 1174
Page 169
D_App D_Pre-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 18
Events for Subcatchment ES-2: E Site
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 1.42 0.139 0.49
10-yr 3.14 4.40 0.400 1.42
100-yr 5.22 10.17 0.895 3.18
Page 169 of 1174
Page 170
D_App D_Pre-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/17/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 19
Events for Reach AP-1: Cayuga Creek
Event Inflow Outflow Elevation Storage
(cfs) (cfs) (feet) (cubic-feet)
1-yr 5.48 5.48 0.00 0
10-yr 16.27 16.27 0.00 0
100-yr 36.80 36.80 0.00 0
Page 170 of 1174
Page 171
Appendix e:
Post development stormwater
modeling
Page 171 of 1174
Page 172
Page 172 of 1174
Page 173
PS-1 BIO-1
Filtration Bioretention
PS-6
PS-2
CH-1 DP-1 PS-7
Chambers Design Point
PS-5
PS-8
PS-3 BIO-2
Filtration Bioretention
PS-4 BIO-3
Filtration Bioretention
Subcat Reach Pond Link Routing Diagram for E_App E_Post-Development Model
Prepared by Labella Associates, Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC
Page 173 of 1174
Page 174
E_App E_Post-Development Model
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing (selected events)
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-yr NY-West Seneca 24-hr S1 1-yr Default 24.00 1 1.82 2
2 10-yr NY-West Seneca 24-hr S1 10-yr Default 24.00 1 3.14 2
3 100-yr NY-West Seneca 24-hr S1 100-yr Default 24.00 1 5.22 2
Page 174 of 1174
Page 175
E_App E_Post-Development Model
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (selected nodes)
Area CN Description
(acres) (subcatchment-numbers)
8.107 80 >75% Grass cover, Good, HSG D (PS-1, PS-2, PS-3, PS-4, PS-7, PS-8)
2.967 98 Paved parking, HSG D (PS-1, PS-2, PS-3, PS-4, PS-5, PS-6)
11.074 85 TOTAL AREA
Page 175 of 1174
Page 176
E_App E_Post-Development Model
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (selected nodes)
Area Soil Subcatchment
(acres) Group Numbers
0.000 HSG A
0.000 HSG B
0.000 HSG C
11.074 HSG D PS-1, PS-2, PS-3, PS-4, PS-5, PS-6, PS-7, PS-8
0.000 Other
11.074 TOTAL AREA
Page 176 of 1174
Page 177
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 5
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=27,596 sf 33.98% Impervious Runoff Depth=0.72"
Tc=6.0 min CN=86 Runoff=0.72 cfs 0.038 af
Subcatchment PS-2: Runoff Area=72,316 sf 88.61% Impervious Runoff Depth=1.40"
Tc=6.0 min CN=96 Runoff=3.74 cfs 0.194 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=0.72"
Tc=6.0 min CN=86 Runoff=0.74 cfs 0.039 af
Subcatchment PS-4: Runoff Area=29,485 sf 70.98% Impervious Runoff Depth=1.15"
Tc=6.0 min CN=93 Runoff=1.28 cfs 0.065 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=1.60"
Tc=6.0 min CN=98 Runoff=1.06 cfs 0.057 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=1.60"
Tc=6.0 min CN=98 Runoff=0.37 cfs 0.020 af
Subcatchment PS-7: Runoff Area=245,856 sf 0.00% Impervious Runoff Depth=0.46"
Flow Length=391' Tc=14.0 min CN=80 Runoff=2.49 cfs 0.215 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=0.46"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=0.40 cfs 0.047 af
Reach DP-1: Design Point Inflow=4.12 cfs 0.674 af
Outflow=4.12 cfs 0.674 af
Pond BIO-1: Filtration Bioretention Peak Elev=598.98' Storage=994 cf Inflow=0.72 cfs 0.038 af
Primary=0.02 cfs 0.038 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.02 cfs 0.038 af
Pond BIO-2: Filtration Bioretention Peak Elev=596.95' Storage=1,010 cf Inflow=0.74 cfs 0.039 af
Primary=0.02 cfs 0.039 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.02 cfs 0.039 af
Pond BIO-3: Filtration Bioretention Peak Elev=595.92' Storage=1,729 cf Inflow=1.28 cfs 0.065 af
Primary=0.04 cfs 0.065 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.04 cfs 0.065 af
Pond CH-1: Chambers Peak Elev=592.38' Storage=0.079 af Inflow=4.80 cfs 0.251 af
8.0" Round Culvert n=0.013 L=25.0' S=0.0100 '/' Outflow=1.18 cfs 0.251 af
Total Runoff Area = 11.074 ac Runoff Volume = 0.674 af Average Runoff Depth = 0.73"
73.21% Pervious = 8.107 ac 26.79% Impervious = 2.967 ac
Page 177 of 1174
Page 178
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 6
Summary for Subcatchment PS-1:
Runoff = 0.72 cfs @ 12.04 hrs, Volume= 0.038 af, Depth= 0.72"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
9,376 98 Paved parking, HSG D
18,220 80 >75% Grass cover, Good, HSG D
27,596 86 Weighted Average
18,220 66.02% Pervious Area
9,376 33.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
0.8 Runoff
0.75
0.72 cfs
0.7 NY-West Seneca 24-hr S1 1-yr
0.65 Rainfall=1.82"
0.6 Runoff Area=27,596 sf
0.55 Runoff Volume=0.038 af
0.5 Runoff Depth=0.72"
Flow (cfs)
0.45 Tc=6.0 min
0.4
CN=86
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 178 of 1174
Page 179
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment PS-2:
Runoff = 3.74 cfs @ 12.04 hrs, Volume= 0.194 af, Depth= 1.40"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
64,081 98 Paved parking, HSG D
8,235 80 >75% Grass cover, Good, HSG D
72,316 96 Weighted Average
8,235 11.39% Pervious Area
64,081 88.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
Runoff
4 3.74 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
3
Runoff Area=72,316 sf
Runoff Volume=0.194 af
Runoff Depth=1.40"
Flow (cfs)
Tc=6.0 min
2
CN=96
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 179 of 1174
Page 180
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment PS-3:
Runoff = 0.74 cfs @ 12.04 hrs, Volume= 0.039 af, Depth= 0.72"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
0.8 Runoff
0.74 cfs
0.75
NY-West Seneca 24-hr S1 1-yr
0.7
Rainfall=1.82"
0.65
0.6
Runoff Area=28,267 sf
0.55 Runoff Volume=0.039 af
0.5 Runoff Depth=0.72"
Flow (cfs)
0.45 Tc=6.0 min
0.4 CN=86
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 180 of 1174
Page 181
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 9
Summary for Subcatchment PS-4:
Runoff = 1.28 cfs @ 12.04 hrs, Volume= 0.065 af, Depth= 1.15"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
8,557 80 >75% Grass cover, Good, HSG D
29,485 93 Weighted Average
8,557 29.02% Pervious Area
20,928 70.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
1.28 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
Runoff Area=29,485 sf
1
Runoff Volume=0.065 af
Runoff Depth=1.15"
Flow (cfs)
Tc=6.0 min
CN=93
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 181 of 1174
Page 182
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment PS-5:
Runoff = 1.06 cfs @ 12.04 hrs, Volume= 0.057 af, Depth= 1.60"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
1.06 cfs
NY-West Seneca 24-hr S1 1-yr
1
Rainfall=1.82"
Runoff Area=18,756 sf
Runoff Volume=0.057 af
Runoff Depth=1.60"
Flow (cfs)
Tc=6.0 min
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 182 of 1174
Page 183
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment PS-6:
Runoff = 0.37 cfs @ 12.04 hrs, Volume= 0.020 af, Depth= 1.60"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
0.4 0.37 cfs
0.38
0.36
NY-West Seneca 24-hr S1 1-yr
0.34 Rainfall=1.82"
0.32
Runoff Area=6,622 sf
0.3
0.28 Runoff Volume=0.020 af
0.26 Runoff Depth=1.60"
0.24
Flow (cfs)
0.22
Tc=6.0 min
0.2 CN=98
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 183 of 1174
Page 184
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 12
Summary for Subcatchment PS-7:
Runoff = 2.49 cfs @ 12.17 hrs, Volume= 0.215 af, Depth= 0.46"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
245,856 80 >75% Grass cover, Good, HSG D
245,856 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
Runoff
2.49 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
2
Runoff Area=245,856 sf
Runoff Volume=0.215 af
Runoff Depth=0.46"
Flow (cfs)
Flow Length=391'
Tc=14.0 min
1
CN=80
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 184 of 1174
Page 185
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 13
Summary for Subcatchment PS-8:
Runoff = 0.40 cfs @ 12.36 hrs, Volume= 0.047 af, Depth= 0.46"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
0.44 Runoff
0.42
0.40 cfs
0.4 NY-West Seneca 24-hr S1 1-yr
0.38
0.36 Rainfall=1.82"
0.34 Runoff Area=53,474 sf
0.32
0.3 Runoff Volume=0.047 af
0.28 Runoff Depth=0.46"
0.26
Flow (cfs)
0.24 Flow Length=821'
0.22 Slope=0.0100 '/'
0.2
0.18 Tc=25.7 min
0.16 CN=80
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 185 of 1174
Page 186
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 14
Summary for Reach DP-1: Design Point
Inflow Area = 11.074 ac, 26.79% Impervious, Inflow Depth = 0.73" for 1-yr event
Inflow = 4.12 cfs @ 12.18 hrs, Volume= 0.674 af
Outflow = 4.12 cfs @ 12.18 hrs, Volume= 0.674 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
4.12 cfs Outflow
4.12 cfs
Inflow Area=11.074 ac
4
3
Flow (cfs)
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 186 of 1174
Page 187
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 15
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.634 ac, 33.98% Impervious, Inflow Depth = 0.72" for 1-yr event
Inflow = 0.72 cfs @ 12.04 hrs, Volume= 0.038 af
Outflow = 0.02 cfs @ 15.87 hrs, Volume= 0.038 af, Atten= 97%, Lag= 229.9 min
Primary = 0.02 cfs @ 15.87 hrs, Volume= 0.038 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 598.98' @ 15.87 hrs Surf.Area= 1,679 sf Storage= 994 cf
Flood Elev= 600.00' Surf.Area= 2,500 sf Storage= 3,120 cf
Plug-Flow detention time= 645.9 min calculated for 0.038 af (100% of inflow)
Center-of-Mass det. time= 646.0 min ( 1,495.6 - 849.7 )
Volume Invert Avail.Storage Storage Description
#1 598.00' 3,120 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
598.00 340 0 0
599.00 1,700 1,020 1,020
600.00 2,500 2,100 3,120
Device Routing Invert Outlet Devices
#1 Primary 598.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 15.87 hrs HW=598.98' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.00 cfs of 5.10 cfs potential flow)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 187 of 1174
Page 188
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 16
Pond BIO-1: Filtration Bioretention
Hydrograph
0.72 cfs Inflow
Outflow
Inflow Area=0.634 ac Primary
Secondary
Tertiary
0.8
0.75
Peak Elev=598.98'
0.7 Storage=994 cf
0.65
0.6
0.55
0.5
Flow (cfs)
0.45
0.4
0.35
0.3
0.25
0.2 0.02 cfs
0.15 0.02 cfs
0.1 0.00 cfs
0.00 cfs
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 188 of 1174
Page 189
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 17
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 0.72" for 1-yr event
Inflow = 0.74 cfs @ 12.04 hrs, Volume= 0.039 af
Outflow = 0.02 cfs @ 15.70 hrs, Volume= 0.039 af, Atten= 97%, Lag= 219.6 min
Primary = 0.02 cfs @ 15.70 hrs, Volume= 0.039 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.95' @ 15.70 hrs Surf.Area= 1,776 sf Storage= 1,010 cf
Flood Elev= 598.00' Surf.Area= 2,630 sf Storage= 3,339 cf
Plug-Flow detention time= 621.3 min calculated for 0.039 af (100% of inflow)
Center-of-Mass det. time= 621.4 min ( 1,471.1 - 849.7 )
Volume Invert Avail.Storage Storage Description
#1 596.00' 3,339 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
596.00 348 0 0
597.00 1,850 1,099 1,099
598.00 2,630 2,240 3,339
Device Routing Invert Outlet Devices
#1 Primary 596.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 15.70 hrs HW=596.95' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.00 cfs of 4.75 cfs potential flow)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 189 of 1174
Page 190
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 18
Pond BIO-2: Filtration Bioretention
Hydrograph
0.74 cfs Inflow
Outflow
Inflow Area=0.649 ac Primary
Secondary
Tertiary
0.8 Peak Elev=596.95'
0.75
0.7 Storage=1,010 cf
0.65
0.6
0.55
0.5
Flow (cfs)
0.45
0.4
0.35
0.3
0.25
0.2 0.02 cfs
0.15 0.02 cfs
0.1 0.00 cfs
0.00 cfs
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 190 of 1174
Page 191
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 19
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.677 ac, 70.98% Impervious, Inflow Depth = 1.15" for 1-yr event
Inflow = 1.28 cfs @ 12.04 hrs, Volume= 0.065 af
Outflow = 0.04 cfs @ 14.68 hrs, Volume= 0.065 af, Atten= 97%, Lag= 158.5 min
Primary = 0.04 cfs @ 14.68 hrs, Volume= 0.065 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 595.92' @ 14.68 hrs Surf.Area= 3,049 sf Storage= 1,729 cf
Flood Elev= 597.00' Surf.Area= 3,978 sf Storage= 5,592 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 587.3 min ( 1,401.4 - 814.2 )
Volume Invert Avail.Storage Storage Description
#1 595.00' 5,592 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
595.00 705 0 0
596.00 3,250 1,978 1,978
597.00 3,978 3,614 5,592
Device Routing Invert Outlet Devices
#1 Primary 595.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.04 cfs @ 14.68 hrs HW=595.92' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.00 cfs of 5.10 cfs potential flow)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 191 of 1174
Page 192
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 20
Pond BIO-3: Filtration Bioretention
Hydrograph
1.28 cfs Inflow
Outflow
Inflow Area=0.677 ac Primary
Secondary
Tertiary
Peak Elev=595.92'
Storage=1,729 cf
1
Flow (cfs)
0.04 cfs
0.04 cfs
0.00 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 192 of 1174
Page 193
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 21
Summary for Pond CH-1: Chambers
Inflow Area = 2.091 ac, 90.96% Impervious, Inflow Depth = 1.44" for 1-yr event
Inflow = 4.80 cfs @ 12.04 hrs, Volume= 0.251 af
Outflow = 1.18 cfs @ 12.29 hrs, Volume= 0.251 af, Atten= 75%, Lag= 15.4 min
Primary = 1.18 cfs @ 12.29 hrs, Volume= 0.251 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 592.38' @ 12.29 hrs Surf.Area= 0.127 ac Storage= 0.079 af
Flood Elev= 598.32' Surf.Area= 0.127 ac Storage= 0.433 af
Plug-Flow detention time= 60.5 min calculated for 0.251 af (100% of inflow)
Center-of-Mass det. time= 60.2 min ( 847.2 - 787.0 )
Volume Invert Avail.Storage Storage Description
#1A 591.25' 0.177 af 37.08'W x 149.10'L x 5.50'H Field A
0.698 af Overall - 0.256 af Embedded = 0.442 af x 40.0% Voids
#2A 592.00' 0.256 af ADS_StormTech MC-3500 d +Cap x 100 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
100 Chambers in 5 Rows
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
0.433 af Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
#1 Primary 591.25' 8.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.25' / 591.00' S= 0.0100 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=1.18 cfs @ 12.29 hrs HW=592.38' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 1.18 cfs @ 3.38 fps)
Page 193 of 1174
Page 194
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 22
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
5 Rows x 77.0" Wide + 9.0" Spacing x 4 + 12.0" Side Stone x 2 = 37.08' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
100 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 5 Rows = 11,144.2 cf Chamber Storage
30,410.2 cf Field - 11,144.2 cf Chambers = 19,266.0 cf Stone x 40.0% Voids = 7,706.4 cf Stone Storage
Chamber Storage + Stone Storage = 18,850.6 cf = 0.433 af
Overall Storage Efficiency = 62.0%
Overall System Size = 149.10' x 37.08' x 5.50'
100 Chambers
1,126.3 cy Field
713.6 cy Stone
Page 194 of 1174
Page 195
E_App E_Post-Development Model NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 23
Pond CH-1: Chambers
Hydrograph
Inflow
4.80 cfs Primary
5
Inflow Area=2.091 ac
Peak Elev=592.38'
4
Storage=0.079 af
8.0"
Flow (cfs)
3
Round Culvert
n=0.013
2
L=25.0'
1.18 cfs
S=0.0100 '/'
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 195 of 1174
Page 196
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 24
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=27,596 sf 33.98% Impervious Runoff Depth=1.78"
Tc=6.0 min CN=86 Runoff=1.71 cfs 0.094 af
Subcatchment PS-2: Runoff Area=72,316 sf 88.61% Impervious Runoff Depth=2.69"
Tc=6.0 min CN=96 Runoff=6.39 cfs 0.372 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=1.78"
Tc=6.0 min CN=86 Runoff=1.75 cfs 0.096 af
Subcatchment PS-4: Runoff Area=29,485 sf 70.98% Impervious Runoff Depth=2.39"
Tc=6.0 min CN=93 Runoff=2.39 cfs 0.135 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=2.91"
Tc=6.0 min CN=98 Runoff=1.72 cfs 0.104 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=2.91"
Tc=6.0 min CN=98 Runoff=0.61 cfs 0.037 af
Subcatchment PS-7: Runoff Area=245,856 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=391' Tc=14.0 min CN=80 Runoff=8.08 cfs 0.638 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=1.36"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=1.32 cfs 0.139 af
Reach DP-1: Design Point Inflow=13.96 cfs 1.615 af
Outflow=13.96 cfs 1.615 af
Pond BIO-1: Filtration Bioretention Peak Elev=599.12' Storage=1,232 cf Inflow=1.71 cfs 0.094 af
Primary=0.02 cfs 0.045 af Secondary=1.10 cfs 0.049 af Tertiary=0.00 cfs 0.000 af Outflow=1.12 cfs 0.094 af
Pond BIO-2: Filtration Bioretention Peak Elev=597.12' Storage=1,319 cf Inflow=1.75 cfs 0.096 af
Primary=0.02 cfs 0.048 af Secondary=1.04 cfs 0.048 af Tertiary=0.00 cfs 0.000 af Outflow=1.06 cfs 0.096 af
Pond BIO-3: Filtration Bioretention Peak Elev=596.12' Storage=2,359 cf Inflow=2.39 cfs 0.135 af
Primary=0.04 cfs 0.084 af Secondary=1.03 cfs 0.050 af Tertiary=0.00 cfs 0.000 af Outflow=1.07 cfs 0.135 af
Pond CH-1: Chambers Peak Elev=593.15' Storage=0.161 af Inflow=8.11 cfs 0.476 af
8.0" Round Culvert n=0.013 L=25.0' S=0.0100 '/' Outflow=1.66 cfs 0.476 af
Total Runoff Area = 11.074 ac Runoff Volume = 1.615 af Average Runoff Depth = 1.75"
73.21% Pervious = 8.107 ac 26.79% Impervious = 2.967 ac
Page 196 of 1174
Page 197
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 25
Summary for Subcatchment PS-1:
Runoff = 1.71 cfs @ 12.04 hrs, Volume= 0.094 af, Depth= 1.78"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
9,376 98 Paved parking, HSG D
18,220 80 >75% Grass cover, Good, HSG D
27,596 86 Weighted Average
18,220 66.02% Pervious Area
9,376 33.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
Runoff
1.71 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=27,596 sf
Runoff Volume=0.094 af
Runoff Depth=1.78"
Flow (cfs)
1
Tc=6.0 min
CN=86
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 197 of 1174
Page 198
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 26
Summary for Subcatchment PS-2:
Runoff = 6.39 cfs @ 12.04 hrs, Volume= 0.372 af, Depth= 2.69"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
64,081 98 Paved parking, HSG D
8,235 80 >75% Grass cover, Good, HSG D
72,316 96 Weighted Average
8,235 11.39% Pervious Area
64,081 88.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
7 Runoff
6.39 cfs
NY-West Seneca 24-hr S1 10-yr
6
Rainfall=3.14"
Runoff Area=72,316 sf
5
Runoff Volume=0.372 af
Runoff Depth=2.69"
Flow (cfs)
4
Tc=6.0 min
CN=96
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 198 of 1174
Page 199
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 27
Summary for Subcatchment PS-3:
Runoff = 1.75 cfs @ 12.04 hrs, Volume= 0.096 af, Depth= 1.78"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
Runoff
1.75 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=28,267 sf
Runoff Volume=0.096 af
Runoff Depth=1.78"
Flow (cfs)
Tc=6.0 min
1
CN=86
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 199 of 1174
Page 200
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 28
Summary for Subcatchment PS-4:
Runoff = 2.39 cfs @ 12.04 hrs, Volume= 0.135 af, Depth= 2.39"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
8,557 80 >75% Grass cover, Good, HSG D
29,485 93 Weighted Average
8,557 29.02% Pervious Area
20,928 70.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
2.39 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
2 Runoff Area=29,485 sf
Runoff Volume=0.135 af
Runoff Depth=2.39"
Flow (cfs)
Tc=6.0 min
CN=93
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 200 of 1174
Page 201
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 29
Summary for Subcatchment PS-5:
Runoff = 1.72 cfs @ 12.04 hrs, Volume= 0.104 af, Depth= 2.91"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
1.72 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=18,756 sf
Runoff Volume=0.104 af
Runoff Depth=2.91"
Flow (cfs)
1
Tc=6.0 min
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 201 of 1174
Page 202
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 30
Summary for Subcatchment PS-6:
Runoff = 0.61 cfs @ 12.04 hrs, Volume= 0.037 af, Depth= 2.91"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
0.65 0.61 cfs
0.6 NY-West Seneca 24-hr S1 10-yr
0.55 Rainfall=3.14"
0.5 Runoff Area=6,622 sf
0.45 Runoff Volume=0.037 af
0.4
Runoff Depth=2.91"
Flow (cfs)
Tc=6.0 min
0.35
CN=98
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 202 of 1174
Page 203
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 31
Summary for Subcatchment PS-7:
Runoff = 8.08 cfs @ 12.15 hrs, Volume= 0.638 af, Depth= 1.36"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
245,856 80 >75% Grass cover, Good, HSG D
245,856 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
9 Runoff
8.08 cfs
8 NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
7
Runoff Area=245,856 sf
6 Runoff Volume=0.638 af
Runoff Depth=1.36"
Flow (cfs)
5 Flow Length=391'
Tc=14.0 min
4
CN=80
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 203 of 1174
Page 204
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 32
Summary for Subcatchment PS-8:
Runoff = 1.32 cfs @ 12.32 hrs, Volume= 0.139 af, Depth= 1.36"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
Runoff
1.32 cfs
NY-West Seneca 24-hr S1 10-yr
Rainfall=3.14"
Runoff Area=53,474 sf
1 Runoff Volume=0.139 af
Runoff Depth=1.36"
Flow (cfs)
Flow Length=821'
Slope=0.0100 '/'
Tc=25.7 min
CN=80
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 204 of 1174
Page 205
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 33
Summary for Reach DP-1: Design Point
Inflow Area = 11.074 ac, 26.79% Impervious, Inflow Depth = 1.75" for 10-yr event
Inflow = 13.96 cfs @ 12.15 hrs, Volume= 1.615 af
Outflow = 13.96 cfs @ 12.15 hrs, Volume= 1.615 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
13.96 cfs Outflow
15 13.96 cfs
14 Inflow Area=11.074 ac
13
12
11
10
9
Flow (cfs)
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 205 of 1174
Page 206
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 34
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.634 ac, 33.98% Impervious, Inflow Depth = 1.78" for 10-yr event
Inflow = 1.71 cfs @ 12.04 hrs, Volume= 0.094 af
Outflow = 1.12 cfs @ 12.12 hrs, Volume= 0.094 af, Atten= 34%, Lag= 4.6 min
Primary = 0.02 cfs @ 12.12 hrs, Volume= 0.045 af
Routed to Reach DP-1 : Design Point
Secondary = 1.10 cfs @ 12.12 hrs, Volume= 0.049 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 599.12' @ 12.12 hrs Surf.Area= 1,797 sf Storage= 1,232 cf
Flood Elev= 600.00' Surf.Area= 2,500 sf Storage= 3,120 cf
Plug-Flow detention time= 326.2 min calculated for 0.094 af (100% of inflow)
Center-of-Mass det. time= 326.4 min ( 1,148.5 - 822.1 )
Volume Invert Avail.Storage Storage Description
#1 598.00' 3,120 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
598.00 340 0 0
599.00 1,700 1,020 1,020
600.00 2,500 2,100 3,120
Device Routing Invert Outlet Devices
#1 Primary 598.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.12 hrs HW=599.12' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=1.10 cfs @ 12.12 hrs HW=599.12' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 1.10 cfs of 6.00 cfs potential flow)
2=Overflow Grate (Weir Controls 1.10 cfs @ 1.14 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 206 of 1174
Page 207
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 35
Pond BIO-1: Filtration Bioretention
Hydrograph
1.71 cfs Inflow
Outflow
Inflow Area=0.634 ac Primary
Secondary
Tertiary
Peak Elev=599.12'
Storage=1,232 cf
1.12 cfs
1.10 cfs
Flow (cfs)
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 207 of 1174
Page 208
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 36
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 1.78" for 10-yr event
Inflow = 1.75 cfs @ 12.04 hrs, Volume= 0.096 af
Outflow = 1.06 cfs @ 12.13 hrs, Volume= 0.096 af, Atten= 39%, Lag= 5.6 min
Primary = 0.02 cfs @ 12.13 hrs, Volume= 0.048 af
Routed to Reach DP-1 : Design Point
Secondary = 1.04 cfs @ 12.13 hrs, Volume= 0.048 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 597.12' @ 12.13 hrs Surf.Area= 1,941 sf Storage= 1,319 cf
Flood Elev= 598.00' Surf.Area= 2,630 sf Storage= 3,339 cf
Plug-Flow detention time= 339.7 min calculated for 0.096 af (100% of inflow)
Center-of-Mass det. time= 339.9 min ( 1,162.0 - 822.1 )
Volume Invert Avail.Storage Storage Description
#1 596.00' 3,339 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
596.00 348 0 0
597.00 1,850 1,099 1,099
598.00 2,630 2,240 3,339
Device Routing Invert Outlet Devices
#1 Primary 596.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.13 hrs HW=597.12' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=1.04 cfs @ 12.13 hrs HW=597.12' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 1.04 cfs of 5.54 cfs potential flow)
2=Overflow Grate (Weir Controls 1.04 cfs @ 1.11 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 208 of 1174
Page 209
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 37
Pond BIO-2: Filtration Bioretention
Hydrograph
1.75 cfs Inflow
Outflow
Inflow Area=0.649 ac Primary
Secondary
Tertiary
Peak Elev=597.12'
Storage=1,319 cf
1.06 cfs
1.04 cfs
Flow (cfs)
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 209 of 1174
Page 210
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 38
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.677 ac, 70.98% Impervious, Inflow Depth = 2.39" for 10-yr event
Inflow = 2.39 cfs @ 12.04 hrs, Volume= 0.135 af
Outflow = 1.07 cfs @ 12.18 hrs, Volume= 0.135 af, Atten= 55%, Lag= 8.6 min
Primary = 0.04 cfs @ 12.18 hrs, Volume= 0.084 af
Routed to Reach DP-1 : Design Point
Secondary = 1.03 cfs @ 12.18 hrs, Volume= 0.050 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.12' @ 12.18 hrs Surf.Area= 3,334 sf Storage= 2,359 cf
Flood Elev= 597.00' Surf.Area= 3,978 sf Storage= 5,592 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 411.1 min ( 1,203.9 - 792.8 )
Volume Invert Avail.Storage Storage Description
#1 595.00' 5,592 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
595.00 705 0 0
596.00 3,250 1,978 1,978
597.00 3,978 3,614 5,592
Device Routing Invert Outlet Devices
#1 Primary 595.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.04 cfs @ 12.18 hrs HW=596.12' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=1.03 cfs @ 12.18 hrs HW=596.12' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 1.03 cfs of 6.00 cfs potential flow)
2=Overflow Grate (Weir Controls 1.03 cfs @ 1.11 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 210 of 1174
Page 211
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 39
Pond BIO-3: Filtration Bioretention
Hydrograph
2.39 cfs Inflow
Outflow
Inflow Area=0.677 ac Primary
Secondary
Tertiary
Peak Elev=596.12'
Storage=2,359 cf
2
1.07 cfs
Flow (cfs)
1.03 cfs
1
0.04 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 211 of 1174
Page 212
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 40
Summary for Pond CH-1: Chambers
Inflow Area = 2.091 ac, 90.96% Impervious, Inflow Depth = 2.73" for 10-yr event
Inflow = 8.11 cfs @ 12.04 hrs, Volume= 0.476 af
Outflow = 1.66 cfs @ 12.48 hrs, Volume= 0.476 af, Atten= 80%, Lag= 26.9 min
Primary = 1.66 cfs @ 12.48 hrs, Volume= 0.476 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 593.15' @ 12.48 hrs Surf.Area= 0.127 ac Storage= 0.161 af
Flood Elev= 598.32' Surf.Area= 0.127 ac Storage= 0.433 af
Plug-Flow detention time= 60.0 min calculated for 0.476 af (100% of inflow)
Center-of-Mass det. time= 59.7 min ( 829.9 - 770.2 )
Volume Invert Avail.Storage Storage Description
#1A 591.25' 0.177 af 37.08'W x 149.10'L x 5.50'H Field A
0.698 af Overall - 0.256 af Embedded = 0.442 af x 40.0% Voids
#2A 592.00' 0.256 af ADS_StormTech MC-3500 d +Cap x 100 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
100 Chambers in 5 Rows
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
0.433 af Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
#1 Primary 591.25' 8.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.25' / 591.00' S= 0.0100 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=1.66 cfs @ 12.48 hrs HW=593.15' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 1.66 cfs @ 4.75 fps)
Page 212 of 1174
Page 213
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 41
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
5 Rows x 77.0" Wide + 9.0" Spacing x 4 + 12.0" Side Stone x 2 = 37.08' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
100 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 5 Rows = 11,144.2 cf Chamber Storage
30,410.2 cf Field - 11,144.2 cf Chambers = 19,266.0 cf Stone x 40.0% Voids = 7,706.4 cf Stone Storage
Chamber Storage + Stone Storage = 18,850.6 cf = 0.433 af
Overall Storage Efficiency = 62.0%
Overall System Size = 149.10' x 37.08' x 5.50'
100 Chambers
1,126.3 cy Field
713.6 cy Stone
Page 213 of 1174
Page 214
E_App E_Post-Development Model NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 42
Pond CH-1: Chambers
Hydrograph
Inflow
9 8.11 cfs Primary
8
Inflow Area=2.091 ac
Peak Elev=593.15'
7
Storage=0.161 af
6
8.0"
Flow (cfs)
5
Round Culvert
4 n=0.013
3 L=25.0'
2
1.66 cfs S=0.0100 '/'
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 214 of 1174
Page 215
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 43
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=27,596 sf 33.98% Impervious Runoff Depth=3.67"
Tc=6.0 min CN=86 Runoff=3.44 cfs 0.194 af
Subcatchment PS-2: Runoff Area=72,316 sf 88.61% Impervious Runoff Depth=4.75"
Tc=6.0 min CN=96 Runoff=10.80 cfs 0.657 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=3.67"
Tc=6.0 min CN=86 Runoff=3.52 cfs 0.199 af
Subcatchment PS-4: Runoff Area=29,485 sf 70.98% Impervious Runoff Depth=4.41"
Tc=6.0 min CN=93 Runoff=4.23 cfs 0.249 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=4.98"
Tc=6.0 min CN=98 Runoff=2.85 cfs 0.179 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=4.98"
Tc=6.0 min CN=98 Runoff=1.01 cfs 0.063 af
Subcatchment PS-7: Runoff Area=245,856 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=391' Tc=14.0 min CN=80 Runoff=18.94 cfs 1.451 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=3.15 cfs 0.316 af
Reach DP-1: Design Point Inflow=31.66 cfs 3.307 af
Outflow=31.66 cfs 3.307 af
Pond BIO-1: Filtration Bioretention Peak Elev=599.25' Storage=1,462 cf Inflow=3.44 cfs 0.194 af
Primary=0.02 cfs 0.048 af Secondary=3.18 cfs 0.146 af Tertiary=0.00 cfs 0.000 af Outflow=3.21 cfs 0.194 af
Pond BIO-2: Filtration Bioretention Peak Elev=597.25' Storage=1,582 cf Inflow=3.52 cfs 0.199 af
Primary=0.02 cfs 0.052 af Secondary=3.23 cfs 0.147 af Tertiary=0.00 cfs 0.000 af Outflow=3.26 cfs 0.199 af
Pond BIO-3: Filtration Bioretention Peak Elev=596.27' Storage=2,865 cf Inflow=4.23 cfs 0.249 af
Primary=0.04 cfs 0.094 af Secondary=3.57 cfs 0.155 af Tertiary=0.00 cfs 0.000 af Outflow=3.61 cfs 0.249 af
Pond CH-1: Chambers Peak Elev=594.85' Storage=0.322 af Inflow=13.65 cfs 0.836 af
8.0" Round Culvert n=0.013 L=25.0' S=0.0100 '/' Outflow=2.40 cfs 0.836 af
Total Runoff Area = 11.074 ac Runoff Volume = 3.308 af Average Runoff Depth = 3.58"
73.21% Pervious = 8.107 ac 26.79% Impervious = 2.967 ac
Page 215 of 1174
Page 216
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 44
Summary for Subcatchment PS-1:
Runoff = 3.44 cfs @ 12.04 hrs, Volume= 0.194 af, Depth= 3.67"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
9,376 98 Paved parking, HSG D
18,220 80 >75% Grass cover, Good, HSG D
27,596 86 Weighted Average
18,220 66.02% Pervious Area
9,376 33.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
Runoff
3.44 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
3
Runoff Area=27,596 sf
Runoff Volume=0.194 af
Runoff Depth=3.67"
Tc=6.0 min
Flow (cfs)
2
CN=86
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 216 of 1174
Page 217
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 45
Summary for Subcatchment PS-2:
Runoff = 10.80 cfs @ 12.04 hrs, Volume= 0.657 af, Depth= 4.75"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
64,081 98 Paved parking, HSG D
8,235 80 >75% Grass cover, Good, HSG D
72,316 96 Weighted Average
8,235 11.39% Pervious Area
64,081 88.61% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
12 Runoff
10.80 cfs
11
NY-West Seneca 24-hr S1 100-yr
10 Rainfall=5.22"
9 Runoff Area=72,316 sf
Runoff Volume=0.657 af
8
Runoff Depth=4.75"
7
Tc=6.0 min
Flow (cfs)
6 CN=96
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 217 of 1174
Page 218
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 46
Summary for Subcatchment PS-3:
Runoff = 3.52 cfs @ 12.04 hrs, Volume= 0.199 af, Depth= 3.67"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
Runoff
3.52 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
3 Runoff Area=28,267 sf
Runoff Volume=0.199 af
Runoff Depth=3.67"
Tc=6.0 min
Flow (cfs)
2 CN=86
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 218 of 1174
Page 219
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 47
Summary for Subcatchment PS-4:
Runoff = 4.23 cfs @ 12.04 hrs, Volume= 0.249 af, Depth= 4.41"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
8,557 80 >75% Grass cover, Good, HSG D
29,485 93 Weighted Average
8,557 29.02% Pervious Area
20,928 70.98% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
4.23 cfs
NY-West Seneca 24-hr S1 100-yr
4
Rainfall=5.22"
Runoff Area=29,485 sf
Runoff Volume=0.249 af
3 Runoff Depth=4.41"
Tc=6.0 min
Flow (cfs)
CN=93
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 219 of 1174
Page 220
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 48
Summary for Subcatchment PS-5:
Runoff = 2.85 cfs @ 12.04 hrs, Volume= 0.179 af, Depth= 4.98"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
3 2.85 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
Runoff Area=18,756 sf
Runoff Volume=0.179 af
2 Runoff Depth=4.98"
Tc=6.0 min
Flow (cfs)
CN=98
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 220 of 1174
Page 221
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 49
Summary for Subcatchment PS-6:
Runoff = 1.01 cfs @ 12.04 hrs, Volume= 0.063 af, Depth= 4.98"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
1.01 cfs
1 NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
Runoff Area=6,622 sf
Runoff Volume=0.063 af
Runoff Depth=4.98"
Tc=6.0 min
Flow (cfs)
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 221 of 1174
Page 222
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 50
Summary for Subcatchment PS-7:
Runoff = 18.94 cfs @ 12.15 hrs, Volume= 1.451 af, Depth= 3.09"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
245,856 80 >75% Grass cover, Good, HSG D
245,856 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
21 Runoff
20 18.94 cfs
19 NY-West Seneca 24-hr S1 100-yr
18
17
Rainfall=5.22"
16 Runoff Area=245,856 sf
15
Runoff Volume=1.451 af
14
13 Runoff Depth=3.09"
Flow Length=391'
Flow (cfs)
12
11
10
Tc=14.0 min
9 CN=80
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 222 of 1174
Page 223
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 51
Summary for Subcatchment PS-8:
Runoff = 3.15 cfs @ 12.31 hrs, Volume= 0.316 af, Depth= 3.09"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
Runoff
3.15 cfs
NY-West Seneca 24-hr S1 100-yr
3
Rainfall=5.22"
Runoff Area=53,474 sf
Runoff Volume=0.316 af
Runoff Depth=3.09"
Flow Length=821'
Flow (cfs)
2
Slope=0.0100 '/'
Tc=25.7 min
CN=80
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 223 of 1174
Page 224
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 52
Summary for Reach DP-1: Design Point
Inflow Area = 11.074 ac, 26.79% Impervious, Inflow Depth = 3.58" for 100-yr event
Inflow = 31.66 cfs @ 12.12 hrs, Volume= 3.307 af
Outflow = 31.66 cfs @ 12.12 hrs, Volume= 3.307 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
31.66 cfs Outflow
34 31.66 cfs
32 Inflow Area=11.074 ac
30
28
26
24
22
Flow (cfs)
20
18
16
14
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 224 of 1174
Page 225
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 53
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.634 ac, 33.98% Impervious, Inflow Depth = 3.67" for 100-yr event
Inflow = 3.44 cfs @ 12.04 hrs, Volume= 0.194 af
Outflow = 3.21 cfs @ 12.06 hrs, Volume= 0.194 af, Atten= 7%, Lag= 1.5 min
Primary = 0.02 cfs @ 12.06 hrs, Volume= 0.048 af
Routed to Reach DP-1 : Design Point
Secondary = 3.18 cfs @ 12.06 hrs, Volume= 0.146 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 599.25' @ 12.06 hrs Surf.Area= 1,896 sf Storage= 1,462 cf
Flood Elev= 600.00' Surf.Area= 2,500 sf Storage= 3,120 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 168.5 min ( 967.4 - 798.9 )
Volume Invert Avail.Storage Storage Description
#1 598.00' 3,120 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
598.00 340 0 0
599.00 1,700 1,020 1,020
600.00 2,500 2,100 3,120
Device Routing Invert Outlet Devices
#1 Primary 598.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.06 hrs HW=599.25' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=3.18 cfs @ 12.06 hrs HW=599.25' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 3.18 cfs of 6.09 cfs potential flow)
2=Overflow Grate (Weir Controls 3.18 cfs @ 1.62 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=598.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 225 of 1174
Page 226
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 54
Pond BIO-1: Filtration Bioretention
Hydrograph
3.44 cfs Inflow
Outflow
3.21 cfs Inflow Area=0.634 ac Primary
Secondary
Tertiary
3.18 cfs Peak Elev=599.25'
Storage=1,462 cf
3
Flow (cfs)
2
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 226 of 1174
Page 227
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 55
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 3.67" for 100-yr event
Inflow = 3.52 cfs @ 12.04 hrs, Volume= 0.199 af
Outflow = 3.26 cfs @ 12.06 hrs, Volume= 0.199 af, Atten= 8%, Lag= 1.6 min
Primary = 0.02 cfs @ 12.06 hrs, Volume= 0.052 af
Routed to Reach DP-1 : Design Point
Secondary = 3.23 cfs @ 12.06 hrs, Volume= 0.147 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 597.25' @ 12.06 hrs Surf.Area= 2,044 sf Storage= 1,582 cf
Flood Elev= 598.00' Surf.Area= 2,630 sf Storage= 3,339 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 176.3 min ( 975.2 - 798.9 )
Volume Invert Avail.Storage Storage Description
#1 596.00' 3,339 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
596.00 348 0 0
597.00 1,850 1,099 1,099
598.00 2,630 2,240 3,339
Device Routing Invert Outlet Devices
#1 Primary 596.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.02 cfs @ 12.06 hrs HW=597.25' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=3.22 cfs @ 12.06 hrs HW=597.25' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 3.22 cfs of 5.63 cfs potential flow)
2=Overflow Grate (Weir Controls 3.22 cfs @ 1.63 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=596.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 227 of 1174
Page 228
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 56
Pond BIO-2: Filtration Bioretention
Hydrograph
3.52 cfs Inflow
Outflow
3.26 cfs Inflow Area=0.649 ac Primary
Secondary
Tertiary
3.23 cfs Peak Elev=597.25'
Storage=1,582 cf
3
Flow (cfs)
2
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 228 of 1174
Page 229
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 57
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.677 ac, 70.98% Impervious, Inflow Depth = 4.41" for 100-yr event
Inflow = 4.23 cfs @ 12.04 hrs, Volume= 0.249 af
Outflow = 3.61 cfs @ 12.08 hrs, Volume= 0.249 af, Atten= 15%, Lag= 2.3 min
Primary = 0.04 cfs @ 12.08 hrs, Volume= 0.094 af
Routed to Reach DP-1 : Design Point
Secondary = 3.57 cfs @ 12.08 hrs, Volume= 0.155 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.27' @ 12.08 hrs Surf.Area= 3,443 sf Storage= 2,865 cf
Flood Elev= 597.00' Surf.Area= 3,978 sf Storage= 5,592 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 255.7 min ( 1,030.5 - 774.9 )
Volume Invert Avail.Storage Storage Description
#1 595.00' 5,592 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
595.00 705 0 0
596.00 3,250 1,978 1,978
597.00 3,978 3,614 5,592
Device Routing Invert Outlet Devices
#1 Primary 595.00' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Primary OutFlow Max=0.04 cfs @ 12.08 hrs HW=596.26' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=3.57 cfs @ 12.08 hrs HW=596.26' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 3.57 cfs of 6.11 cfs potential flow)
2=Overflow Grate (Weir Controls 3.57 cfs @ 1.68 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=595.00' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Page 229 of 1174
Page 230
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 58
Pond BIO-3: Filtration Bioretention
Hydrograph
4.23 cfs Inflow
Outflow
Inflow Area=0.677 ac Primary
Secondary
Tertiary
3.61 cfs Peak Elev=596.27'
4
3.57 cfs Storage=2,865 cf
3
Flow (cfs)
2
1
0.04 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 230 of 1174
Page 231
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 59
Summary for Pond CH-1: Chambers
Inflow Area = 2.091 ac, 90.96% Impervious, Inflow Depth = 4.80" for 100-yr event
Inflow = 13.65 cfs @ 12.04 hrs, Volume= 0.836 af
Outflow = 2.40 cfs @ 12.57 hrs, Volume= 0.836 af, Atten= 82%, Lag= 31.8 min
Primary = 2.40 cfs @ 12.57 hrs, Volume= 0.836 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 594.85' @ 12.57 hrs Surf.Area= 0.127 ac Storage= 0.322 af
Flood Elev= 598.32' Surf.Area= 0.127 ac Storage= 0.433 af
Plug-Flow detention time= 68.0 min calculated for 0.836 af (100% of inflow)
Center-of-Mass det. time= 68.1 min ( 825.0 - 757.0 )
Volume Invert Avail.Storage Storage Description
#1A 591.25' 0.177 af 37.08'W x 149.10'L x 5.50'H Field A
0.698 af Overall - 0.256 af Embedded = 0.442 af x 40.0% Voids
#2A 592.00' 0.256 af ADS_StormTech MC-3500 d +Cap x 100 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
100 Chambers in 5 Rows
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
0.433 af Total Available Storage
Storage Group A created with Chamber Wizard
Device Routing Invert Outlet Devices
#1 Primary 591.25' 8.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.25' / 591.00' S= 0.0100 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
Primary OutFlow Max=2.40 cfs @ 12.57 hrs HW=594.85' TW=0.00' (Dynamic Tailwater)
1=Culvert (Inlet Controls 2.40 cfs @ 6.87 fps)
Page 231 of 1174
Page 232
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 60
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 5 rows = 149.0 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
5 Rows x 77.0" Wide + 9.0" Spacing x 4 + 12.0" Side Stone x 2 = 37.08' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
100 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 5 Rows = 11,144.2 cf Chamber Storage
30,410.2 cf Field - 11,144.2 cf Chambers = 19,266.0 cf Stone x 40.0% Voids = 7,706.4 cf Stone Storage
Chamber Storage + Stone Storage = 18,850.6 cf = 0.433 af
Overall Storage Efficiency = 62.0%
Overall System Size = 149.10' x 37.08' x 5.50'
100 Chambers
1,126.3 cy Field
713.6 cy Stone
Page 232 of 1174
Page 233
E_App E_Post-Development Model NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 61
Pond CH-1: Chambers
Hydrograph
Inflow
15
13.65 cfs Primary
14 Inflow Area=2.091 ac
13
12
Peak Elev=594.85'
11 Storage=0.322 af
10
9
8.0"
Flow (cfs)
8 Round Culvert
7
n=0.013
6
5 L=25.0'
4
2.40 cfs S=0.0100 '/'
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 233 of 1174
Page 234
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 62
Events for Subcatchment PS-1:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.72 0.038 0.72
10-yr 3.14 1.71 0.094 1.78
100-yr 5.22 3.44 0.194 3.67
Page 234 of 1174
Page 235
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 63
Events for Subcatchment PS-2:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 3.74 0.194 1.40
10-yr 3.14 6.39 0.372 2.69
100-yr 5.22 10.80 0.657 4.75
Page 235 of 1174
Page 236
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 64
Events for Subcatchment PS-3:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.74 0.039 0.72
10-yr 3.14 1.75 0.096 1.78
100-yr 5.22 3.52 0.199 3.67
Page 236 of 1174
Page 237
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 65
Events for Subcatchment PS-4:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 1.28 0.065 1.15
10-yr 3.14 2.39 0.135 2.39
100-yr 5.22 4.23 0.249 4.41
Page 237 of 1174
Page 238
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 66
Events for Subcatchment PS-5:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 1.06 0.057 1.60
10-yr 3.14 1.72 0.104 2.91
100-yr 5.22 2.85 0.179 4.98
Page 238 of 1174
Page 239
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 67
Events for Subcatchment PS-6:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.37 0.020 1.60
10-yr 3.14 0.61 0.037 2.91
100-yr 5.22 1.01 0.063 4.98
Page 239 of 1174
Page 240
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 68
Events for Subcatchment PS-7:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 2.49 0.215 0.46
10-yr 3.14 8.08 0.638 1.36
100-yr 5.22 18.94 1.451 3.09
Page 240 of 1174
Page 241
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 69
Events for Subcatchment PS-8:
Event Rainfall Runoff Volume Depth
(inches) (cfs) (acre-feet) (inches)
1-yr 1.82 0.40 0.047 0.46
10-yr 3.14 1.32 0.139 1.36
100-yr 5.22 3.15 0.316 3.09
Page 241 of 1174
Page 242
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 70
Events for Reach DP-1: Design Point
Event Inflow Outflow Elevation Storage
(cfs) (cfs) (feet) (cubic-feet)
1-yr 4.12 4.12 0.00 0
10-yr 13.96 13.96 0.00 0
100-yr 31.66 31.66 0.00 0
Page 242 of 1174
Page 243
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 71
Events for Pond BIO-1: Filtration Bioretention
Event Inflow Outflow Primary Secondary Tertiary Elevation Storage
(cfs) (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet)
1-yr 0.72 0.02 0.02 0.00 0.00 598.98 994
10-yr 1.71 1.12 0.02 1.10 0.00 599.12 1,232
100-yr 3.44 3.21 0.02 3.18 0.00 599.25 1,462
Page 243 of 1174
Page 244
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 72
Events for Pond BIO-2: Filtration Bioretention
Event Inflow Outflow Primary Secondary Tertiary Elevation Storage
(cfs) (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet)
1-yr 0.74 0.02 0.02 0.00 0.00 596.95 1,010
10-yr 1.75 1.06 0.02 1.04 0.00 597.12 1,319
100-yr 3.52 3.26 0.02 3.23 0.00 597.25 1,582
Page 244 of 1174
Page 245
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 73
Events for Pond BIO-3: Filtration Bioretention
Event Inflow Outflow Primary Secondary Tertiary Elevation Storage
(cfs) (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet)
1-yr 1.28 0.04 0.04 0.00 0.00 595.92 1,729
10-yr 2.39 1.07 0.04 1.03 0.00 596.12 2,359
100-yr 4.23 3.61 0.04 3.57 0.00 596.27 2,865
Page 245 of 1174
Page 246
E_App E_Post-Development Model Multi-Event Tables
Prepared by Labella Associates Printed 4/20/2026
HydroCAD® 10.20-7a s/n 09581 © 2025 HydroCAD Software Solutions LLC Page 74
Events for Pond CH-1: Chambers
Event Inflow Primary Elevation Storage
(cfs) (cfs) (feet) (acre-feet)
1-yr 4.80 1.18 592.38 0.079
10-yr 8.11 1.66 593.15 0.161
100-yr 13.65 2.40 594.85 0.322
Page 246 of 1174
Page 247
Appendix f:
Swppp inspection report
(sample form)
Page 247 of 1174
Page 248
Page 248 of 1174
Page 249
Prepared by:
LaBella Associates
Choose an item.
Choose an item.
Choose an item.
SWPPP INSPECTION REPORT NUMBER XX
CLIENT NAME
PROJECT NAME
PROJECT ADDRESS, TOWN OF X, X COUNTY, NY
PERMIT NUMBER
Performed: 2/1/2025 @ 12:00 AM
Report Issued: 2/1/2025
Status: SATISFACTORY (All erosion control measures are installed and in
working order)
Qualified Inspector (name and title) Qualified Professional (name and title)
Click or tap to enter a date. Click or tap to enter a date.
Date Date
Signature Signature
Page 249 of 1174
Page 250
Page 250 of 1174
Page 251
NYSDEC Documentation and SWPPP Forms
The project has received a Letter of Authorization (LOA) from NYSDEC Choose an item.
The project has received a five acre waiver approved by NYSDEC or MS4 Choose an item.
The project currently has disturbance greater than five acres Choose an item.
The project directly discharges to a 303d waterbody/course Choose an item.
The project is within a phosphorus enhanced watershed Choose an item.
Number of inspections required per week Choose an item.
Included in Site Log Book
Preconstruction Assessment Choose an item.
Copy of Notice of Intent (NOI) Choose an item.
Letter of Authorization (LOA) Choose an item.
SWPPP Preparer Certification Form Choose an item.
Owner/Operator Certification Form Choose an item.
MS4 SWPPP Acceptance Form Choose an item.
NYCDEP SWPPP Acceptance/Approval Form Choose an item.
MS4 No Jurisdiction Form Choose an item.
Contractor and Subcontractor Certifications Choose an item.
SPDES General Permit Choose an item.
Five Acre Waiver Authorization Choose an item.
Notice of Termination (NOT) Choose an item.
Site Conditions
Total area (acres) with active soil disturbance (not requiring temporary or final stabilization)
Total area (acres) with inactive soil disturbance (requiring temporary or final stabilization)
Total area (acres) that has achieved temporary stabilization
Total area (acres) that has achieved final stabilization
Allowable disturbed area (acres) per NOI and/or five acre waiver
Provide a general description of construction activities ongoing during inspection:
Weather Conditions Choose an item.
Temperature at time of inspection XX degrees F
Soil conditions at time of inspection Choose an item.
Description of Discharge
Sediment Discharge
Point/Surface Waters of Condition of Runoff Corrective Action(s)
Noted
the State
Choose an item. Choose an item.
Choose an item. Choose an item.
Choose an item. Choose an item.
Choose an item. Choose an item.
Page 251 of 1174
Page 252
Erosion and Sediment Control Deficiencies and Corrective Actions
In the following table, provide marks in the appropriate columns to indicate the conditions of all erosion and
sediment control practices at the site.
Erosion & Sediment Control Functioning as Needs Repair or Not Installed
Not Applicable
Practice Designed Maintenance Properly
Temporary Erosion & Sediment Control Practices
General Site Conditions ☐ ☐ ☐ ☐
Stabilized Construction Access ☐ ☐ ☐ ☐
Silt Fence ☐ ☐ ☐ ☐
Inlet Protection Measures ☐ ☐ ☐ ☐
Soil Stockpiles ☐ ☐ ☐ ☐
Dust Control Measures ☐ ☐ ☐ ☐
Pavement Sweeping ☐ ☐ ☐ ☐
Temporary Stabilization ☐ ☐ ☐ ☐
Dewatering Operations ☐ ☐ ☐ ☐
Slope Protection Measures ☐ ☐ ☐ ☐
Temporary Parking Areas ☐ ☐ ☐ ☐
Concrete Washout ☐ ☐ ☐ ☐
Temporary Swales and Berms ☐ ☐ ☐ ☐
Stone Check Dams ☐ ☐ ☐ ☐
Sediment Traps/Basins ☐ ☐ ☐ ☐
Compost Filter Sock ☐ ☐ ☐ ☐
Temporary Stream Crossing ☐ ☐ ☐ ☐
Fiber Roll ☐ ☐ ☐ ☐
Water Bars ☐ ☐ ☐ ☐
Flow Diffusers ☐ ☐ ☐ ☐
Other: ☐ ☐ ☐ ☐
Permanent Erosion & Sediment Control Practices
Rock Outlet Protection ☐ ☐ ☐ ☐
Permanent Turf Reinforcement ☐ ☐ ☐ ☐
Permanent Stabilization ☐ ☐ ☐ ☐
Other: ☐ ☐ ☐ ☐
Refer to the following page for deficiencies and corrective actions
Page 252 of 1174
Page 253
Corrective Actions
For all erosion and sediment control practices identified in the above table as “needs repair or maintenance” or “not
installed properly,” provide detailed corrective actions that are required.
Date
Date
Deficiency Deficiency
ESC Practice ID Deficiency and Corrective Action Deficiency
First Corrected?
Corrected
Reported
Choose an item. Click or Choose an Click or tap
Choose an item. tap to
Click or item. an
Choose to enter
Click a
or tap
Choose an item. enter
tap to
Click a
or item. an
Choose date.
to enter
Click a
or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. date.
to enter a
date.a
enter date.
date.
Page 253 of 1174
Page 254
Stormwater Management Practices
For all stormwater management practices proposed on the project, indicate the status of each practice at the time
of inspection, any deficiencies (if applicable) and corresponding corrective actions.
SMP
Sign Deficiency and Corrective Deficiency Corrected
Practice Status
Installed Action (if Applicable) Date Action Date
ID
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Page 254 of 1174
Page 255
Deficiencies and Corrective Action Photo Log
Deficiency Photo 1 Corrective Action Photo 1
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 2 Corrective Action Photo 2
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 3 Corrective Action Photo 3
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Page 255 of 1174
Page 256
Deficiencies and Corrective Action Photo Log (continued)
Deficiency Photo 4 Corrective Action Photo 4
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 5 Corrective Action Photo 5
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 6 Corrective Action Photo 6
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Page 256 of 1174
Page 257
Disturbance / Photo Location Map
Replace this page to include an 11x17 erosion control plan sketch to scale showing:
1. Areas with active soil disturbance activity
2. Areas with inactive soil disturbance activity
3. Areas that have achieved temporary stabilization
4. Areas that have achieved final stabilization
5. Photo locations for deficiencies
6. Photo locations for corrective actions
7. Location of erosion and sediment control practices installed
Use Bluebeam template with standard colors to indicate limits
Page 257 of 1174
Page 258
Page 258 of 1174
Page 259
Appendix G:
Post-construction
inspections and maintenance
Page 259 of 1174
Page 260
Page 260 of 1174
Page 261
Bioretention Stormwater Management Practices
Level 1 Inspection Checklist
SMP ID # SMP Owner Private
Public
SMP Location
(Address; Latitude
& Longitude)
Latitude Longitude
Party Responsible for
System Type Type of Site
Maintenance
Same as SMP Owner Seasonal Above Ground Commercial
Other Continuous Use Below Ground Industrial
Other Residential
_________________________
State
Inspection Date Inspection Time
Inspector
Date of Last
Inspection
BR Drainage Area
Look for areas that are uphill from the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Seed and mulch areas of bare soil to establish
vegetation.
Bare soil, erosion Fill in erosion areas with soil, compact, and seed and
of the ground straw to establish vegetation.
(rills washing out If a rill or small channel is forming, try to redirect water
the dirt) flowing to this area by creating a small berm or adding
topsoil to areas that are heavily compacted.
Other:
Page 1 of 8
Page 261 of 1174
Page 262
BR Drainage Area
Look for areas that are uphill from the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Kick-Out to Level 2 Inspection: Large areas of soil
have been eroded, or larger channels are forming.
May require rerouting of flow paths.
Piles of grass Remove or cover piles of grass clippings,
clippings, mulch, mulch, dirt, etc.
dirt, salt, or
other materials Other:
Cover or properly dispose of materials; consult your
Open containers local solid waste authority for guidance on materials
of oil, grease, that may be toxic or hazardous.
paint, or other
substances
Other:
Page 2 of 8
Page 262 of 1174
Page 263
BR Inlets
Stand in the Bioretention cell itself and look for all the places where water flows in. Often there will be multiple points of inflow to the
practice.
Problem (Check if Present) Follow-Up Actions
Use a flat shovel to remove grit and debris (especially at curb inlets
or openings). Parking lots generate fine grit that will accumulate at
these spots.
Pull out clumps of growing grass or weeds and scoop out the soil or grit
that the plants are growing in.
Remove any grass clippings, leaves, sticks, and other debris that is
collecting at inlets.
For pipes and ditches, remove sediment and debris that is partially
blocking the pipe or ditch opening where it enters the Bioretention cell.
Dispose of all material properly where it will not re-enter the
Bioretention cell.
Other:
Inlets collect grit and debris or grass/weeds.
Some water may not be getting into the
Bioretention cell. The objective is to have a
clear pathway for water to flow into the cell.
Kick-Out to Level 2 Inspection: Inlets are blocked to the extent that most
of the water does not seem to be entering the Bioretention cell.
For small areas of erosion, smooth out the eroded part and apply rock or
stone (e.g., river cobble) to prevent further erosion. Usually, filter fabric is
placed under the rock or stone.
In some cases, reseeding and applying erosion-control matting can be
used to prevent further erosion. Some of these materials may be available
at a garden center, but it may be best to consult a landscape contractor.
Other:
Kick-Out to Level 2 Inspection: Erosion is occurring at most of the inlets,
Some or all of the inlets are eroding so that and it looks like there is too much water that is concentrating at these
rills, gullies, and other erosion is present, or points. The inlet design may have to be modified.
there is bare dirt that is washing into the
Bioretention cell.
Page 3 of 8
Page 263 of 1174
Page 264
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Add new mulch to a total depth (including any existing mulch that is left) of 2
to 3 inches. The mulch should be shredded hardwood mulch that is less
likely to float away during rainstorms.
Avoid adding too much mulch so that inlets are obstructed or certain areas
become higher than the rest of the Bioretention surface.
Other:
Mulch (if used) needs to be replaced or
replenished. The mulch layer had
decomposed or is less than 1-inch thick.
Use a shovel to scoop out minor areas of sediment or grit, especially in the
spring after winter sanding materials may wash in and accumulate. Dispose
of the material where it cannot re-enter the Bioretention cell .
If removing the material creates a hole or low area, fill with soil mix that
matches original mix and cover with mulch so that the Bioretention surface
area is as flat as possible.
Remove trash, vegetative debris, and other undesirable materials.
Other:
Kick-Out to Level 2 Inspection: Sediment has accumulated more than 2-
inches deep and covers 25% or more of the Bioretention surface.
Kick-Out to Level 2 Inspection: The Bioretention cell is too
densely vegetated to assess sediment accumulation or ponding;
Minor areas of sediment, grit, trash, or other see BR-4, Vegetation.
debris are accumulating on the bottom.
Page 4 of 8
Page 264 of 1174
Page 265
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Try filling the eroded areas with clean topsoil or sand, and cover with
mulch.
If the problem recurs, you may have to use stone (e.g., river cobble) to fill
in problem areas.
If the erosion is on a side slope, fill with clay that can be compacted and
seed and mulch the area.
Other:
There is erosion in the bottom or on the side
slopes. Water seems to be carving out rills as
it flows across the Bioretention surface or on
the slopes, or sinkholes are forming in certain Kick-Out to Level 2 Inspection: The problem persists or the erosion is more
areas. than 3-inches deep and seems to be an issue with how water enters and
Source: Stormwater Maintenance, LLC. moves through the Bioretention cell.
Kick-Out to Level 2 Inspection: The problem does not seem to be caused
by flowing water, but a collapse or sinking of the surface (e.g., “sinkhole”)
due to some underground problem.
If the problem is minor (just small, isolated areas are not covered with
water), try raking the surface OR adding mulch to low spots to create a
more level surface. You may need to remove and replace plantings in
order to properly even off the surface.
Check the surface with a string and bubble level to get the surface as flat
as possible.
Other:
Kick-Out to Level 2 Inspection: Ponding water is isolated to less than half
The bottom of the Bioretention cell is not flat,
of the Bioretention surface area, and there seem to be elevation
and the water pools at one end, along an
differences of more than a couple of inches across the surface.
edge, or in certain pockets. The whole bottom
is not uniformly covered with water. See
design plan to verify that bioretention surface
is intended to be flat. Check during or
immediately after a rainstorm.
Page 5 of 8
Page 265 of 1174
Page 266
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Kick-Out to Level 2 Inspection: This is generally a serious problem, and it
will be necessary to activate a Level 2 Inspection.
Water stands on the surface more than 72
hours after a rainstorm and /or wetland-type
vegetation is present. The Bioretention cell
does not appear to be draining properly.
BR Vegetation
Examine all Bioretention cell vegetation.
Problem (Check if Present) Follow-Up Actions
If you can identify which plants are weeds or not intended to
be part of the planting plan, eliminate these, preferably by
hand pulling.
If weeds are widespread, check with the local stormwater
authority and/or Extension Office about proper use of
herbicides for areas connected with the flow of water.
Even vegetation that is intended to be present can become
large, overgrown, and/or crowd out surrounding plants. Prune
and thin accordingly.
If weeds or invasive plants have overtaken the whole
Bioretention cell , bush-hog the entire area before seedheads
form in the spring. It will be necessary to remove the root mat
manually or with appropriate herbicides, as noted above.
Re-plant with species that are aesthetically pleasing and
seem to be doing well in the Bioretention cell.
Other:
Kick-Out to Level 2 Inspection: You are unsure of the original
planting design, or the vegetation maintenance task is beyond
Vegetation requires regular maintenance—pulling
your capabilities of time, expertise, or resources. If you are
weeds, removing dead and diseased plants, replacing
unsure of the health of the vegetation (e.g. salt damage,
mulch around plants, adding plants to fill in areas that
invasives, which plants are undesirable) or the appropriate
are not well vegetated, etc.
season to conduct vegetation management, consult a
landscape professional before undertaking any cutting,
pruning, mowing, or brush hogging.
Page 6 of 8
Page 266 of 1174
Page 267
BR Vegetation
Examine all Bioretention cell vegetation.
Problem (Check if Present) Follow-Up Actions
The original plants are likely not suited for the actual
conditions within the Bioretention cell . If you are
knowledgeable about plants, select and plant more
appropriate vegetation (preferably native plants) so that
almost the entire surface area will be covered by the end of
the second growing season.
Other:
Kick-Out to Level 2 Inspection: For all but small practices
(e.g., rain gardens), this task will likely require a landscape
design professional or horticulturalist.
Vegetation is too thin, is not healthy, and there are
many spots that are not well vegetated.
BR Outlets
Examine outlets that release water out of the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Add stone to reduce the impact from the water flowing out of the outlet pipe or
weir during storms.
Other:
Erosion at outlet
Kick-Out to Level 2 Inspection: Rills have formed and erosion problem
becomes more severe.
Remove the debris and dispose of it where it cannot re-enter the
Bioretention cell .
Other:
Kick-Out to Level 2 Inspection: Outlet is completely clogged or obstructed;
there is too much material to remove by hand or with simple hand tools.
Outlet obstructed with mulch, sediment,
debris, trash, etc.
Page 7 of 8
Page 267 of 1174
Page 268
Additional Notes:
Inspector: Date:
Complete the following if follow-up/corrective actions were identified during this inspection:
Certified Completion of Follow-Up Actions:
“I hereby certify that the follow-up/corrective actions identified in the inspection
performed on _____________ (DATE) have been completed and any required
maintenance deficiencies have been adequately corrected.”
Inspector/Operator: Date:
Page 8 of 8
Page 268 of 1174
Page 269
Bioretention Stormwater Management Practices
Level 2 Inspection Checklist
SMP ID # SMP Owner Private
Public
SMP Location
(Address; Latitude
& Longitude)
Latitude Longitude
Party Responsible for
System Type Type of Site
Maintenance
Same as SMP Owner Seasonal Above Ground Commercial
Other Continuous Use Below Ground Industrial
Other Residential
_________________________ State
Inspection Date Inspection Time
Inspector
Date of Last
Inspection
Page 1 of 4
Page 269 of 1174
Page 270
Level 2 Inspection: BIORETENTION
NOTE: Key Source for this Information (CSN, 2013)
Recommended Repairs Triggers for Level 3 Inspection
Observed Condition: Water Stands on Surface for More than 72 Hours after Storm
Condition 1: Small pockets of standing water
Use a soil probe or auger to examine the soil profile. If isolated areas have
accumulated grit, fines, or vegetative debris or have bad soil media, try scraping
off top 3 inches of media and replacing with clean material. Also check to see
that surface is level and water is not ponding selectively in certain areas. Soil media is clogged and problem is not
evident from Level 2 inspection.
Level 2 inspection identifies problem, but it
Condition 2: Standing water is widespread or covers entire surface cannot be resolved easily or is associated
with the original design of the practice.
Requires diagnosis and resolution of problem:
Clogged underdrain?
Filter fabric between soil media and underdrain stone?
Need to install underdrain if not present? Level 3 inspection necessary
Too much sediment/grit washing in from drainage area?
Too much ponding depth?
Improper soil media?
Observed Condition: Vegetation is sparse or out of control
Condition 1: Original design planting plan seems good but has not been
maintained, so there are many invasives and/or dead plants
Vegetation deviates significantly from
Will require some horticultural experience to restore vegetation to intended original planting plan; Bioretention has
condition by weeding, pruning, removing plants, and adding new plants. been neglected and suffered from deferred
maintenance.
Owner/responsible party does not know
Condition 2: Original design planting plan is unknown or cannot be how to maintain the practice.
actualized
A landscape architect or horticulturalist will be needed to redo the planting plan.
Will likely require analysis of soil pH, moisture, organic content, sun/shade, and
other conditions to make sure plants match conditions. Plan should include Level 3 inspection necessary
invasive plant management and maintenance plan to include mulching,
watering, disease intervention, periodic thinning/pruning, etc.
Observed Condition: Bioretention does not conform to original design plan in surface area or storage
Condition 1: Level 2 Inspection reveals that practice is too small based More than a 25% departure from the
on design dimension, does not have adequate storage (e.g., ponding approved plan in surface area, storage, or
depth) based on the plan, and/or does not treat the drainage area runoff drainage area; sometimes less than this
as indicated on the plan threshold at the discretion of the Level 2
inspector.
Small areas of deviation can be corrected by the property owner or responsible
party, but it is likely that a Qualified Professional will have to revisit the design
and attempt a redesign that meets original objectives or that can be resubmitted
to the municipality for approval. Level 3 inspection necessary
Page 2 of 4
Page 270 of 1174
Page 271
Level 2 Inspection: BIORETENTION
NOTE: Key Source for this Information (CSN, 2013)
Recommended Repairs Triggers for Level 3 Inspection
Observed Condition: Severe erosion of filter bed, inlets, or around outlets
Condition 1: Erosion at inlets
The lining (e.g., grass, matting, stone, rock) may not be adequate for the actual
flow velocities coming through the inlets. First line of defense is to try a more
non-erosive lining and/or to extend the lining further down to where inlet slopes
meet the Bioretention surface. If problem persists, analysis by a Qualified Erosion (rills, gullies) is more than 12
Professional is warranted. inches deep at inlets or the filter bed or
more than 3 inches deep on side slopes.
If the issue is not caused by moving water
Condition 2: Erosion of Bioretention filter bed but some sort of subsurface defect. This
may manifest as a sinkhole or linear
This is often caused by “preferential flow paths” through and along the depression and be associated with
Bioretention surface. The source of flow should be analyzed and methods problems with the underdrain stone or pipe
employed to dissipate energy and disperse the flow (e.g., check dams, rock or underlying soil.
splash pads).
Condition 3: Erosion on side slopes
Level 3 inspection necessary
Again, the issue is likely linked with unanticipated flow paths down the side
slopes (probably overland flow that concentrates as it hits the edge of the
slope). For small or isolated areas, try filling, compacting, and re-establishing
healthy ground cover vegetation. If the problem is more widespread, further
analysis is required to determine how to redirect the flow.
Observed Condition: Significant sediment accumulation, indicating an uncontrolled source of sediment
Condition 1: Isolated areas of sediment accumulation, generally less than
3-inches deep
More than 2 inches of accumulated
Sediment source may be from a one-time or isolated event. Remove sediment cover 25% or more of the
accumulated sediment and top 2 to 3 inches of Bioretention soil media; replace Bioretention surface area.
with clean material. Check drainage area for any ongoing sources of sediment.
“Hard pan” of thin, crusty layer covers
majority of Bioretention surface area and
seems to be impeding flow of water down
Condition 2: Majority of the surface is caked with “hard pan” (thin layer of through the soil media.
clogging material) or accumulated sediment that is 3-inches deep or
more New sources of sediment seem to be
accumulating with each significant rainfall
This can be caused by an improper construction sequence (drainage area not event.
fully stabilized prior to installation of Bioretention soil media) or another chronic
source of sediment in the drainage area. Augering several holes down through
the media can indicate how severe the problem is; often the damage is confined
to the first several inches of soil media. Removing and replacing this top layer Level 3 inspection necessary
(or to the depth where sediment incursion is seen in auger holes) can be
adequate, as long as the problem does not recur.
Page 3 of 4
Page 271 of 1174
Page 272
Notes:
Inspector: Date:
Complete the following if follow-up/corrective actions were identified during this inspection:
Certified Completion of Follow-Up Actions:
“I hereby certify that the follow-up/corrective actions identified in the inspection
performed on _____________ (DATE) have been completed and any required
maintenance deficiencies have been adequately corrected.”
Inspector/Operator: Date:
Page 4 of 4
Page 272 of 1174
Page 273
Appendix e:
Nysdec “deep-ripping and
decompaction,” April 2008
Page 273 of 1174
Page 274
Page 274 of 1174
Page 275
New York State
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Document Prepared by:
John E. Lacey,
Land Resource Consultant and Environmental Compliance Monitor
Division of Water (Formerly with the Division of Agricultural Protection and Development Services,
NYS Dept. of Agriculture & Markets)
Deep-Ripping and
Decompaction
April 2008
New York State
Department of Environmental Conservation
Page 275 of 1174
Page 276
AlternativeȱStormwaterȱManagementȱ
DeepȬRippingȱandȱDecompactionȱ
ȱ ȱ ȱ ȱ ȱ ȱ ȱ ȱ ȱ Recommended Application of Practice
Description
Theȱobjective of Deep Ripping and
The two-phase practice of 1) “Deep Ripping;” and 2) “Decompaction” (deep subsoiling), of the Decompaction is to effectively fracture
soil material as a step in the cleanup and restoration/landscaping of a construction site, helps (vertically and laterallly) through the thickness
mitigate the physically induced impacts of soil compression; i.e.: soil compaction or the of the physically compressed subsoil material
substantial increase in the bulk density of the soil material. (see Figure 3), restoring soil porosity and
permeability and aiding infiltration to help
Deep Ripping and Decompaction are key factors which help in restoring soil pore space and reduce runoff. Together with topsoil stripping,
permeability for water infiltration. Conversely, the physical actions of cut-and-fill work, land the “two-phase” practice of Deep Ripping and
grading, the ongoing movement of construction equipment and the transport of building Decompaction first became established as a “best
materials throughout a site alter the architecture and structure of the soil, resulting in: the mixing management practice” through ongoing success
of layers (horizons) of soil materials, compression of those materials and diminished soil on commercial farmlands affected by heavy Fig. 3. Construction site with significant
porosity which, if left unchecked, severely impairs the soil’s water holding capacity and vertical utility construction right-of-way projects compaction of the deep basal till subsoil
drainage (rainfall infiltration), from the surface downward. (transmission pipelines and large power lines). extends 24 inches below this exposed cut-
and-fill work surface.
In a humid climate region, compaction damage on a site is virtually guaranteed over the duration Soil permeability, soil drainage and cropland
of a project. Soil in very moist to wet condition when compacted, will have severely reduced productivity were restored. For broader
permeability. Figure 1 displays the early stage of the deep-ripping phase (Note that all topsoil construction application, the two-phase practice of Deep Ripping and Decompaction is best
was stripped prior to construction access, and it remains stockpiled until the next phase – adapted to areas impacted with significant soil compaction, on contiguous open portions of large
decompaction – is complete). A heavy-duty tractor is pulling a three-shank ripper on the first of construction sites and inside long, open construction corridors used as temporary access over the
several series of incrementally deepening passes through the construction access corridor's duration of construction. Each mitigation area should have minimal above-and-below-ground
densely compressed subsoil material. Figure 2 illustrates the approximate volumetric obstructions for the easy avoidance and maneuvering of a large tractor and ripping/decompacting
composition of a loam surface soil when conditions are good for plant growth, with adequate implements. Conversely, the complete two-phase practice is not recommended in congested or
natural pore space for fluctuating moisture conditions. obstructed areas due to the limitations on tractor and implement movement.
Benefits
Aggressive “deep ripping” through the compressed thickness of exposed subsoil before the
replacement/respreading of the topsoil layer, followed by “decompaction,” i.e.: “sub-soiling,”
through the restored topsoil layer down into the subsoil, offers the following benefits:
x Increases the project (larger size) area’s direct surface infiltration of rainfall by
providing the open site’s mitigated soil condition and lowers the demand on
concentrated runoff control structures
Fig. 1. A typical deep ripping phase of this
practice, during the first in a series of Fig. 2. About 50% of the volume of undisturbed x Enhances direct groundwater recharge through greater dispersion across and through a
progressively deeper “rips” through severely loam surface soil is pore space, when soil is in broader surface than afforded by some runoff-control structural measures
compressed subsoil. good condition for plant growth. Brady, 2002.
x Decreases runoff volume generated and provides hydrologic source control
ȱ
x May be planned for application in feasible open locations either alone or in
1
2
Page 276 of 1174
Page 277
conjunction with plans for structural practices (e.g., subsurface drain line or lawn/ground cover to help maintain the restored subsoil structure. Infiltration after construction-
infiltration basin) serving the same or contiguous areas induced mixing and compression of such subsoil material can be notably rehabilitated with the
Deep Ripping and Decompaction practice, which prepares the site for the appropriate long-term
x Promotes successful long-term revegetation by restoring soil permeability, drainage and lawn/ground cover mix including deep taproot plants such as clover, fescue or trefoil, etc. needed
water holding capacity for healthy (rather than restricted) root-system development of for all rehabilitated soils.
trees, shrubs and deep rooted ground cover, minimizing plant drowning during wet
periods and burnout during dry periods. Generally, soils in Hydrologic Soil Groups A and B, which respectively may include deep, well-
drained, sandy-gravelly materials or deep, moderately well-drained basal till materials, are among
Feasibility/Limitations the easier ones to restore permeability and infiltration, by deep ripping and decompaction. Among
the many different soils in Hydrologic Soil Group C are those unique glacial tills having a natural
The effectiveness of Deep Ripping and Decompaction is governed mostly by site factors such as: fragipan zone, beginning about 12 to 18 inches (30 – 45cm), below surface. Although soils in
the original (undisturbed) soil’s hydrologic characteristics; the general slope; local weather/timing Hydrologic Soil Group C do require a somewhat more carefully applied level of the Deep Ripping
(soil moisture) for implementation; the space-related freedom of equipment/implement and Decompaction practice, it can greatly benefit such affected areas by reducing the runoff and
maneuverability (noted above in Recommended Application of Practice), and by the proper fostering infiltration to a level equal to that of pre-disturbance.
selection and operation of tractor and implements (explained below in Design Guidance). The
more notable site-related factors include: Soils in Hydrologic Soil Group D typically have a permanent high water table close to the surface,
influenced by a clay or other highly impervious layer of material. In many locations with clay
Soil subsoil material, the bulk density is so naturally high that heavy trafficking has little or no added
In the undisturbed condition, each identified soil type comprising a site is grouped into one of impact on infiltration; and structural runoff control practices rather than Deep Ripping and
four categories of soil hydrology, Hydrologic Soil Group A, B, C or D, determined primarily by a Decompaction should be considered.
range of characteristics including soil texture, drainage capability when thoroughly wet, and depth
to water table. The natural rates of infiltration and transmission of soil-water through the The information about Hydrologic Soil Groups is merely a general guideline. Site-specific data
undisturbed soil layers for Group A is “high” with a low runoff potential while soils in Group B such as limited depths of cut-and-fill grading with minimal removal or translocation of the inherent
are moderate in infiltration and the transmission of soil-water with a moderate runoff potential, subsoil materials (as analyzed in the county soil survey) or, conversely, the excavation and
depending somewhat on slope. Soils in Group C have slow rates of infiltration and transmission translocation of deeper, unconsolidated substratum or consolidated bedrock materials (unlike the
of soil-water and a moderately high runoff potential influenced by soil texture and slope; while analyzed subsoil horizons’ materials referred to in the county soil survey) should always be taken
soils in Group D have exceptionally slow into account.
rates of infiltration and transmission of soil-
water, and high runoff potential. Sites made up with significant quantities of large rocks, or having a very shallow depth to bedrock,
are not conducive to deep ripping and decompation (subsoiling); and other measures may be more
In Figure 4, the profile displays the practical.
undisturbed horizons of a soil in Hydrologic
Soil Group C and the naturally slow rate of Slope
infiltration through the subsoil. The slow rate The two-phase application of 1) deep ripping and 2) decompaction (deep subsoiling), is most
of infiltration begins immediately below the practical on flat, gentle and moderate slopes. In some situations, such as but not limited to
topsoil horizon (30 cm), due to the limited temporary construction access corridors, inclusion areas that are moderately steep along a project’s
amount of macro pores, e.g.: natural subsoil otherwise gentle or moderate slope may also be deep ripped and decompacted. For limited
fractures, worm holes and root channels. instances of moderate steepness on other projects, however, the post-construction land use and the
Infiltration after the construction-induced relative alignment of the potential ripping and decompaction work in relation to the lay of the
mixing and compression of such subsoil slope should be reviewed for safety and practicality. In broad construction areas predominated by
material is virtually absent; but can be moderately steep or steep slopes, the practice is generally not used.
restored back to this natural level with the
Fig. 4. Profile (in centimeters) displaying the Local Weather/Timing/Soil Moisture
two-phase practice of deep ripping and
infiltration test result of the natural undisturbed Effective fracturing of compressed subsoil material from the exposed work surface, laterally and
decompaction, followed by the permanent
horizons of a soil in Hydrologic Soil Group C. vertically down through the affected zone is achieved only when the soil material is moderately
establishment of an appropriate, deep taproot
dry to moderately moist. Neither one of the two-phases, deep ripping nor decompaction (deep
3 4
Page 277 of 1174
Page 278
subsoiling), can be effectively conducted when the soil material (subsoil or replaced topsoil) is in rainfall infiltration are being restored, a policy limiting all further traffic to permanent travel lanes
either a “plastic” or “liquid” state of soil consistency. Pulling the respective implements legs is maintained.
through the soil when it is overly moist only results in the “slicing and smearing” of the material or
added “squeezing and compression” instead of the necessary fracturing. Ample drying time is The other critical elements, outlined below, are: using the proper implements (deep, heavy-duty
needed for a “rippable” soil condition not merely in the material close to the surface, but rippers and subsoilers), and ample pulling-power equipment (tractors); and conducting the practice
throughout the material located down to the bottom of the physically compressed zone of the at the appropriate speed, depth and pattern(s) of movement.
subsoil.
Note that an appropriate plan for the separate practice of establishing a healthy perennial ground
The “poor man’s Atterberg field test” for soil cover, with deep rooting to help maintain the restored soil structure, should be developed in
plasticity is a simple “hand-roll” method used advance. This may require the assistance of an agronomist or landscape horticulturist.
for quick, on-site determination of whether or
not the moisture level of the affected soil
material is low enough for: effective deep Implements
ripping of subsoil; respreading of topsoil in a Avoid the use of all undersize implements. The small-to-medium, light-duty tool will, at best, only
friable state; and final decompaction (deep “scarify” the uppermost surface portion of the mass of compacted subsoil material. The term
subsoiling). Using a sample of soil material “chisel plow” is commonly but incorrectly applied to a broad range of implements. While a few
obtained from the planned bottom depth of may be adapted for the moderate subsoiling of non-impacted soils, the majority are less durable
ripping, e.g.: 20 - 24 inches below exposed and used for only lighter land-fitting (see Figure 6).
subsoil surface, the sample is hand rolled
between the palms down to a 1/8-inch diameter
thread. (Use the same test for stored topsoil Fig. 5. Augered from a depth of 19 inches
material before respreading on the site.) If the below the surface of the replaced topsoil,
respective soil sample crumbles apart in this subsoil sample was hand rolled to a
segments no greater than 3/8 of an inch long, by 1/8-inch diameter. The test shows the soil at
the time it is rolled down to 1/8 inch diameter, it this site stretches out too far without
is low enough in moisture for deep ripping (or crumbling; it indicates the material is in a
topsoil replacement), and decompaction. plastic state of consistence, too wet for final
Conversely, as shown in Figure 5, if the rolled decompaction (deep subsoiling) at this time.
sample stretches out in increments greater than
3/8 of an inch long before crumbling, it is in a “plastic” state of soil consistency and is too wet for
subsoil ripping (as well as topsoil replacement) and final decompaction.
Fig. 6. A light duty chisel implement, not Fig. 7. One of several variations of an
adequate for either the deep ripping or agricultural ripper. This unit has long, rugged
Design Guidance
shanks mounted on a steel V-frame for deep,
decompaction (deep subsoiling) phase.
aggressive fracturing through Phase 1.
Beyond the above-noted site factors, a vital requirement for the effective Deep Ripping and
Decompaction (deep subsoiling), is implementing the practice in its distinct, two-phase process:
Use a “heavy duty” agricultural-grade, deep ripper (see Figures 7,9,10 and 11) for the first phase:
1) Deep rip the affected thickness of exposed subsoil material (see Figure 10 and 11), aggressively the lateral and vertical fracturing of the mass of exposed and compressed subsoil, down and
fracturing it before the protected topsoil is reapplied on the site (see Figure 12); and through, to the bottom of impact, prior to the replacement of the topsoil layer. (Any oversize rocks
which are uplifted to the subsoil surface during the deep ripping phase are picked and removed.)
2) Decompact (deep subsoil), simultaneously through the restored topsoil layer and the upper half Like the heavy-duty class of implement for the first phase, the decompaction (deep subsoiling) of
of the affected subsoil (Figure 13). The second phase, “decompaction,” mitigates the partial Phase 2 is conducted with the heavy-duty version of the deep subsoiler. More preferable is the
recompaction which occurs during the heavy process of topsoil spreading/grading. Prior to deep angled-leg variety of deep subsoiler (shown in Figures 8 and 13). It minimizes the inversion of the
ripping and decompacting the site, all construction activity, including construction equipment and subsoil and topsoil layers while laterally and vertically fracturing the upper half of the previously
material storage, site cleanup and trafficking (Figure 14), should be finished; and the site closed off ripped subsoil layer and all of the topsoil layer by delivering a momentary, wave-like “lifting and
to further disturbance. Likewise, once the practice is underway and the area’s soil permeability and shattering” action up through the soil layers as it is pulled.
5 6
Page 278 of 1174
Page 279
Pulling-Power of Equipment Depth and Patterns of Movement
Use the following rule of thumb for tractor horsepower (hp) whenever deep ripping and As previously noted both Phase 1 Deep Ripping through significantly compressed, exposed subsoil
decompacting a significantly impacted site: For both types of implement, have at least 40 hp of and Phase 2 Decompaction (deep subsoiling) through the replaced topsoil and upper subsoil need
tractor pull available for each mounted shank/ leg. to be performed at maximum capable depth of each implement. With an implement’s guide wheels
attached, some have a “normal” maximum operating depth of 18 inches, while others may go
Using the examples of a 3-shank and a 5-shank implement, the respective tractors should have 120 deeper. In many situations, however, the tractor/implement operator must first remove the guide
and 200 hp available for fracturing down to the final depth of 20-to-24 inches per phase. Final wheels and other non essential elements from the implement. This adapts the ripper or the deep
depth for the deep ripping in Phase 1 is achieved incrementally by a progressive series of passes subsoiler for skillful pulling with its frame only a few inches above surface, while the shanks or
(see Depth and Patterns of Movement, below); while for Phase 2, the full operating depth of the legs, fracture the soil material 20-to-24 inches deep.
deep subsoiler is applied from the beginning.
There may be construction sites where the depth of the exposed subsoil’s compression is moderate,
The operating speed for pulling both types of e.g.: 12 inches, rather than deep. This can be verified by using a ¾ inch cone penetrometer and a
implement should not exceed 2 to 3 mph. At shovel to test the subsoil for its level of compaction, incrementally, every three inches of
this slow and managed rate of operating speed, increasing depth. Once the full thickness of the subsoil’s compacted zone is finally “pieced” and
maximum functional performance is sustained there is a significant drop in the psi measurements of the soil penetrometer, the depth/thickness of
by the tractor and the implement performing the compaction is determined. This is repeated at several representative locations of the construction
soil fracturing. Referring to Figure 8, the site. If the thickness of the site’s subsoil compaction is verified as, for example, ten inches, then
implement is the 6-leg version of the deep the Phase 1 Deep Ripping can be correspondingly reduced to the implement’s minimum operable
angled-leg subsoiler. Its two outside legs are depth of 12 inches. However, the Phase 2 simultaneous Decompation (subsoiling) of an 11 inch
“chained up” so that only four legs will be thick layer of replaced topsoil and the upper subsoil should run at the subsoiling implements full
engaged (at the maximum depth), requiring no operating depth.
less than 160 hp, (rather than 240 hp) of pull.
The 4-wheel drive, articulated-frame tractor in
Figure 8 is 174 hp. It will be decompacting this Fig. 8. A deep, angled-leg subsoiler, ideal for
unobstructed, former construction access area Phase 2 decompaction of after the topsoil layer
simultaneously through 11 inches of replaced is graded on top of the ripped subsoil.
topsoil and the upper 12 inches of the
previously deep-ripped subsoil. In constricted
areas of Phase 1) Deep Ripping, a medium-size
tractor with adequate hp, such as the one in
Figure 9 pulling a 3-shank deep ripper, may be
more maneuverable.
Some industrial-grade variations of ripping Fig. 10. An early pass with a 3-shank deep Fig. 11. A repeat run of the 3-shank ripper
implements are attached to power graders and ripper penetrating only 8 inches into this along the same patterned pass area as Fig. 9;
bulldozers. Although highly durable, they are worksite’s severely compressed subsoil. here, incrementally reaching 18 of the needed
generally not recommended. Typically, the 22 inches of subsoil fracture.
shanks or “teeth” of these rippers are too short
and stout; and they are mounted too far apart to
achieve the well-distributed type of lateral and Fig. 9. This medium tractor is pulling a 3- Typically, three separate series (patterns) are used for both the Phase 1 Deep Ripping and the
vertical fracturing of the soil materials shank deep ripper. The severely compacted Phase 2 Decompaction on significantly compacted sites. For Phase 1, each series begins with a
necessary to restore soil permeability and construction access corridor is narrow, and the moderate depth of rip and, by repeat-pass, continues until full depth is reached. Phase 2 applies the
infiltration. In addition, the power graders and 120 hp tractor is more maneuverable for Phase full depth of Decompation (subsoiling), from the beginning.
bulldozers, as pullers, are far less maneuverable 1 deep ripping (subsoil fracturing), here.
for turns and patterns than the tractor. Every separate series (pattern) consists of parallel, forward-and-return runs, with each progressive
7 8
Page 279 of 1174
Page 280
pass of the implement’s legs or shanks evenly staggered between those from the previous pass.
This compensates for the shank or leg-spacing on the implement, e.g., with 24-to-30 inches Ɣ A second series of passes makes a broad “S” shaped pattern of rips, continually
between each shank or leg. The staggered return pass ensures lateral and vertical fracturing and gradually alternating the “S” curves between opposite edges inside the
actuated every 12 to 15 inches across the densely compressed soil mass. compacted corridor.
Large, Unobstructed Areas Ɣ The third and final series again uses the broad, alternating S pattern, but it is
For larger easy areas, use the standard patterns of movement: “flip-flopped” to continually cross the previous S pattern along the corridor’s
centerline. This final series of the S pattern curves back along the edge areas
Ɣ The first series (pattern) of passes is applied lengthwise, parallel with the longest skipped by the second series.
spread of the site; gradually progressing across the site’s width, with each
successive pass. Maintenance and Cost
Ɣ The second series runs obliquely, crossing the first series at an angle of Once the two-phase practice of Deep Ripping and Decompation is completed, two items are
about 45 degrees. essential for maintaining a site’s soil porosity and permeability for infiltration. They are: planting
and maintaining the appropriate ground cover with deep roots to maintain the soil structure (see
Ɣ The third series runs at right angle (or 90 degrees), to the first series to complete Figure 15); and keeping the site free of traffic or other weight loads.
the fracturing and shattering on severely compacted sites, and avoid leaving large
unbroken blocks of compressed soil material. (In certain instances, the third series Note that site-specific choice of an appropriate vegetative ground-cover seed mix, including the
may be optional, depending on how thoroughly the first two series loosen the proper seeding ratio of one or more perennial species with a deep taproot system and the proper
material and eliminate large chunks/blocks of material as verified by tests with a ¾- amount of lime and soil nutrients (fertilizer mix) adapted to the soil-needs, are basic to the final
inch cone penetrometer.) practice of landscaping, i.e: surface tillage, seeding/planting/fertilizing and culti-packing or
mulching is applied. The "maintenance" of an effectively deep-ripped and decompacted area is
generally limited to the successful perennial (long-term) landscape ground cover; as long as no
weight-bearing force of soil compaction is applied.
Fig. 13. The same deep, angled-leg subsoiler
Fig. 12. Moderately dry topsoil is being
shown in Fig. 7 is engaged at maximum
replaced on the affected site now that Phase 1
depth for Phase 2, decompaction (deep
deep ripping of the compressed subsoil is
soiling), of the replaced topsoil and the upper Fig. 15. The same site as Fig. 14 after deep
complete. Fig. 14. The severely compacted soil of a
subsoil materials. ripping of the exposed subsoil, topsoil
temporary construction yard used daily by replacement, decompaction through the
heavy equipment for four months; shown topsoil and upper subsoil and final surface
before deep ripping, topsoil replacement, and tillage and revegetation to maintain soil
Corridors
decompaction. permeability and infiltration.
In long corridors of limited width and less maneuverability than larger sites, e.g.: along
compacted areas used as temporary construction access, a modified series of pattern passes
are used.
Ɣ First, apply the same initial lengthwise, parallel series of passes described above.
9 10
Page 280 of 1174
Page 281
The Deep Ripping and Decompaction practice is, by necessity, more extensive than periodic Resources
subsoiling of farmland.The cost of deep ripping and decompacting (deep subsoiling), will vary
according to the depth and severity of soil-material compression and the relative amount of Publications:ȱ
tractor and implement time that is required. In some instances, depending on open ȣȱAmericanȱȱSocietyȱofȱȱAgriculturalȱEngineers.ȱ1971.ȱȱCompactionȱofȱȱAgriculturalȱȱSoils.ȱȱASAE.ȱ
maneuverability, two-to-three acres of compacted project area may be deep-ripped in one day. In ȱ
other situations of more severe compaction and - or less maneuverability, as little as one acre may ȣȱBrady,ȱN.C.,ȱandȱR.R.ȱWeil.ȱ2002.ȱȱTheȱȱNatureȱȱandȱȱPropertiesȱȱofȱȱSoils.ȱ13thȱed.ȱPearsonȱEducation,ȱInc.ȱ
be fully ripped in a day. Generally, if the Phase 1) Deep Ripping is fully effective, the Phase 2) ȱ
Decompaction should be completed in 2/3 to 3/4 of the time required for Phase 1. ȣȱBaver,ȱL.D.ȱ1948.ȱSoilȱPhysics.ȱJohnȱWileyȱ&ȱSons.ȱ
ȱ
Using the example of two acres of Phase 1) Deep Ripping in one day, at $1800 per day, the net ȣȱCarpachi,ȱN.ȱ1987ȱ(1995ȱfifthȱprinting).ȱExcavationȱandȱGradingȱHandbook,ȱRevised.ȱȱ2ndȱed.ȱCraftsmanȱBookȱ
cost is $900 per acre. If the Phase 2) Decompacting or deep subsoiling takes 3/4 the time as Phase Companyȱ
1, it costs $675 per acre for a combined total of $1575 per acre to complete the practice (these ȣȱEllis,ȱB.ȱ(Editor).ȱ1997.ȱȱSafeȱ&ȱEasyȱLawnȱCare:ȱȱTheȱCompleteȱGuideȱtoȱOrganicȱLowȱMaintenanceȱLawn.ȱȱ
figures do not include the cost of the separate practice of topsoil stripping and replacement). Due HoughtonȱMifflin.ȱ
to the many variables, it must be recognized that cost will be determined by the specific conditions ȱ
or constraints of the site and the availability of proper equipment. ȣȱ Harpstead,ȱ M.I.,ȱ T.J.ȱ Sauer,ȱ andȱ W.F.ȱ Bennett.ȱ 2001.ȱ ȱ Soilȱ Scienceȱ Simplified.ȱ 4thȱ ed.ȱ Iowaȱ Stateȱ Universityȱȱ
Press.ȱ
ȱ
ȣȱ ȱ Magdoff,ȱ F.,ȱ ȱ andȱ ȱ H.ȱ vanȱ Es.ȱ ȱ 2000.ȱ ȱ Buildingȱ Soilsȱ ȱ forȱ ȱ Betterȱ Crops.ȱ 2ndȱ ed.ȱ Sustainableȱ Agriculturalȱ
Networksȱ
ȱ
ȣȱȱMcCarthy,ȱD.F.ȱ1993.ȱEssentialsȱofȱSoilȱMechanicsȱandȱFoundations,ȱBasicȱGeotechnicsȱ4thȱed.ȱRegents/Prenticeȱ
Hall.ȱ
ȱ
ȣȱȱȱȱȱȱPlaster,ȱE.J.ȱ1992.ȱSoilȱScienceȱ&ȱManagement.ȱ3rdȱed.ȱDelmarȱPublishers.ȱ
ȱ
ȣȱ ȱ ȱ Unionȱ Gasȱ Limited,ȱ Ontario,ȱ Canada.ȱ 1984.ȱ Rehabilitationȱ ofȱ Agriculturalȱ Lands,ȱ DawnȬKerwoodȱ ȱ Loopȱȱ
Pipeline;ȱȱȱTechnicalȱȱȱReport.ȱȱȱEcologicalȱȱȱServicesȱȱforȱȱPlanning,ȱȱLtd.;ȱRobinson,ȱMerrittȱ&ȱDevries,ȱ
Ltd.ȱandȱSmith,ȱHoffmanȱAssociates,ȱLtd.ȱ
ȱ
ȣȱȱȱUSȱDepartmentȱofȱAgricultureȱinȱcooperationȱwithȱCornellȱUniversityȱAgriculturalȱExperimentȱȱStation.ȱȱ
Variousȱyears.ȱȱSoilȱȱSurveyȱofȱȱ(variousȱnames)ȱȱCounty,ȱȱNewȱYork.ȱUSDA.ȱ
ȱ
InternetȱAccess:ȱ
ȣȱȱȱȱExamplesȱofȱimplements:ȱȱ
ȱVȬRippers.ȱȱAccessȱbyȱȱinternetȱsearchȱofȱJohnȱDeereȱAgȱȬNewȱEquipmentȱȱȱforȱȱ915ȱȱ(largerȬframeȱmodel)ȱȱVȬ
Rippe;ȱȱand,ȱȱȱforȱ913ȱȱ(smallerȬframeȱmodel)ȱVȬRipper.ȱȱDeep,ȱangledȬlegȱsubsoiler.ȱȱAccessȱȱbyȱȱinternetȱ
searchȱȱof:ȱBighamȱȱBrothersȱShearȱBoltȱȱParatillȬSubsoiler.ȱ
http://salesmanual.deere.com/sales/salesmanual/en_NA/primary_tillage/2008/feature/rippers/915v_pattern_frame.html?sbu=a
g&link=prodcat LastȱvisitedȱMarchȱ08.ȱ
ȱ
ȣȱ Soilsȱ dataȱ ofȱ USDAȱ Naturalȱ Resourcesȱ Conservationȱ Service.ȱ NRCSȱ Webȱ Soilȱ Survey.ȱȱȱȱȱȱȱȱȱȱȱȱȱȱ
http://websoilsurvey.nrcs.usda.gov/app/ȱȱȱandȱȱUSDAȬNRCSȱȱOfficialȱȱSoilȱȱSeriesȱDescriptions;ȱViewȱbyȱ
Name.ȱhttp://ortho.ftw.nrcs.usda.gov/cgiȬbin/osd/osdname.cgiȱ.ȱLastȱvisitedȱJan.ȱ08.ȱ
ȱ
ȣȱȱSoilȱȱpenetrometerȱȱinformation.ȱȱAccessȱȱbyȱȱȱinternetȱȱsearchesȱȱof:ȱȱȱDiagnosingȱSoilȱCompactionȱȱȱusingȱȱaȱ
Penetrometerȱ(soilȱcompactionȱtester),ȱPSUȱExtension;ȱȱasȱȱwellȱȱasȱDickeyȬjohnȱSoilȱCompactionȱTester.ȱ
http://www.dickey-johnproducts.com/pdf/SoilCompactionTest.pdf and http://cropsoil.psu.edu/Extension/Facts/uc178pdf Lastȱ
visitedȱSept.ȱ07ȱ
11 12
Page 281 of 1174
Page 282
Page 282 of 1174
Page 283
Appendix f:
Labella certifying
professionals letter
Page 283 of 1174
Page 284
Page 284 of 1174
Page 285
February 21, 2025
RE: LaBella Certifying Professionals for NYSDEC SPDES GP-0-25-001
To Whom it May Concern:
In accordance with the NYSDEC SPDES General Permit GP-0-25-001, Part VII.J.2, Kristopher Winkler,
PE, a New York State Qualified Professional employed by LaBella Associates, is duly authorized to sign
and seal Stormwater Pollution Prevention Plans (SWPPPs), Notice of Intents (NOIs) and Notice of
Terminations (NOTs).
Respectfully submitted,
LaBella Associates
Timothy Webber Kristopher Winkler, PE
Vice President, Civil Division Director Senior Civil Engineer
Team Leader
Page 285 of 1174
Page 286
Page 286 of 1174
Page 287
Appendix G:
Nysdec spdes general permit
gp-0-25-001
Page 287 of 1174
Page 288
Page 288 of 1174
Page 289
Page 289 of 1174
Page 290
Page 290 of 1174
Page 291
Page 291 of 1174
Page 292
Page 292 of 1174
Page 293
Page 293 of 1174
Page 294
Page 294 of 1174
Page 295
Page 295 of 1174
Page 296
Page 296 of 1174
Page 297
Page 297 of 1174
Page 298
Page 298 of 1174
Page 299
Page 299 of 1174
Page 300
Page 300 of 1174
Page 301
Page 301 of 1174
Page 302
Page 302 of 1174
Page 303
Page 303 of 1174
Page 304
Page 304 of 1174
Page 305
Page 305 of 1174
Page 306
Page 306 of 1174
Page 307
Page 307 of 1174
Page 308
Page 308 of 1174
Page 309
Page 309 of 1174
Page 310
Page 310 of 1174
Page 311
Page 311 of 1174
Page 312
Page 312 of 1174
Page 313
Page 313 of 1174
Page 314
Page 314 of 1174
Page 315
Page 315 of 1174
Page 316
Page 316 of 1174
Page 317
Page 317 of 1174
Page 318
Page 318 of 1174
Page 319
Page 319 of 1174
Page 320
Page 320 of 1174
Page 321
Page 321 of 1174
Page 322
Page 322 of 1174
Page 323
Page 323 of 1174
Page 324
Page 324 of 1174
Page 325
Page 325 of 1174
Page 326
Page 326 of 1174
Page 327
Page 327 of 1174
Page 328
Page 328 of 1174
Page 329
Page 329 of 1174
Page 330
Page 330 of 1174
Page 331
Page 331 of 1174
Page 332
Page 332 of 1174
Page 333
Page 333 of 1174
Page 334
Page 334 of 1174
Page 335
July 27, 2026
Jeffery Schieber
Code Enforcement Officer
1250 Union Road – Room 210
West Seneca, New York 14224
RE: 2544 Clinton Street – Home Leasing – West Seneca Apartments
Planning Board Submission – Additional Items for Review
Mr. Schieber:
On behalf of Home Leasing, we offer the following responses, supplemental information
and drawings based on the Site Plan Submission Review letter dated July 9th 2026.
1. Coordinate with the New York State Department of Environmental Conservation
(NYSDEC) to determine whether any permits or approvals are required for the
proposed work within or adjacent to the Buffalo Creek streambank.
Response: Fieldwork for the wetland and stream delineation was performed on
7/22/2026. No wetlands were found on site, the delineation report is forthcoming. Top
of Stream bank was also delineated and added to the plans (shown in red on C301 and
C302). There is no work proposed below the Top of Bank, all proposed storm outlet
pipes are above the delineation limits.
2. Provide documentation of NYSDEC's determination and obtain any required permits
or approvals prior to Planning Board approval.
Response: Wetland delineation report is forthcoming. Based on the outcome of the
delineation, we do not anticipate that any permits related to the project’s proximity to
the creek are required. A DEC SPDES permit will be obtained for the SWPPP.
3. Revise the stormwater calculations to account for the off-site drainage area that
enters the property through the existing swale along the front of the site. Based on
field observations, it appears that a significant upstream watershed, estimated to
exceed five (5) acres, contributes runoff to the site's drainage system.
Response: The additional 5-acres of off-site drainage have been added as a
standalone drainage area to the stormwater calculations, SWPPP, and pipe sizing
worksheet. The proposed diversion drainage swale accommodates the additional
runoff without any sizing changes. The outlet pipe from the swale to Cayuga Creek has
been increased to 15”. See revised pipe sizing calculations, C301 and C302.
4. The revised drainage analysis shall evaluate the impact of this contributing
watershed on the proposed stormwater management facilities and include any
necessary modifications to the design.
Page 335 of 1174
Page 336
Response: After including the additional 5-acres of off-site drainage, the stormwater
calculations were updated accordingly. The compiled revised SWPPP in is included for
review. An overview of the resulting revisions:
• Updated redevelopment worksheet to include the additional 5-acres which
increased the required WQv for the site (Appendix C).
• Treatment for the additional water quality is achieved via a new bioretention
area – “Bio – 1A” to treat drainage area PS-1A. (SWPPP narrative, Appendix C,
Figure A-7, Sheets C301 and C401).
• The total WQv and RRv for the site are achieved through 4 bioretention areas
and 1 water quality unit (Appendix C).
• HydroCAD – The pre-development and post-development models were updated
to include the 5-acre off-site drainage area. Bio-1A was added to the post-
development model. Per Town code the calculations were checked to ensure
that the post-development 25-yr storm runoff is less than the pre-development
10-year storm (SWPPP narrative, Appendix D, Appendix E)
• eNOI was updated to reflect the above mentioned SWPPP revisions (Appendix B)
5. The submitted photometric plan indicates minor increases in light levels on the
adjacent parcel to the west. While these increases appear to be minimal and are
expected to be mitigated by existing or proposed screening, the applicant should
verify that the lighting design complies with applicable Town requirements.
Response: Per Town Code Section 79-2 – The design meets listed code requirements.
Existing vegetation will remain along the creek on the western side of the property to
provide screening, should light spillage extend to the property line (center of creek). All
lights fixtures will be downward facing and dark sky compliant.
6. Additional investigation of existing utilities is required. Updated information
identifying the location, size, and status of existing utilities shall be provided and
incorporated into the construction plans.
Response: Additional fieldwork and site investigation to location the existing mansion
utilities will be performed prior to issuance of the final construction documents. The
project is proposing all new utility connections for property. Existing utility connections
will abandoned and/or removed as directed by the Town staff.
7. Provide additional geotechnical investigation and supporting documentation to
evaluate existing soil conditions and groundwater elevations. The investigation shall
demonstrate that the proposed stormwater treatment practices and underground
stormwater storage system are feasible and will function as intended given the
potential for a high groundwater table.
Response: Acknowledged, groundwater elevation testing will be completed to verify
that the proposed stormwater practices have sufficient separation. Should the results
2
Page 336 of 1174
Page 337
come back with a higher water table than expected, an impermeable liner will be
installed in stormwater practices within that area(s).
Attached with this submission are the following revised items:
• C301 – Utility Plan
• C302 - Utility Plan
• C401 – Grading Plan
• Compiled SWPPP – Revised July 2026
• Pipe Sizing Calculations – Revised July 2026
We look forward to presenting this project to the Planning Board on August 13th, 2026. If you
have any questions or need any additional information, please feel free to contact me at
585-770-2525 or [email protected].
Respectfully submitted,
LaBella Associates
Shelby Vakiener
Civil Engineer
3
Page 337 of 1174
Page 338
NOT FOR CONSTRUCTION
ST
± 75LF 12" SICPP @ 1.33%
599
2
ST
MATCH TO INSET
E STORM 0+95
300 Pearl Street, Suite 130
598
ST
Buffalo, NY 14202
RIPRAP OUTLET 716-551-6281
CONTROL (TYP.) ST-4.0
599 24"X24" CB labellapc.com
ST
END SECTION 600 RIM=599.00
INV= 593.50 CLEANOUT 600 NE INV=594.51
SE INV=594.51 599
598 NW INV=594.51
W INV=594.51
600
ST
C0
UD UD UD UD UD UD UD UD UD UD UD C
NEW 2' WIDE
.00% ST ± 63LF 6" PCPP @ 0.00%
NEW 2' WIDE
E STORM 0+00
HDP E@1 ST
GRAVEL DIAPHRAGM
600.14 GRAVEL DIAPHRAGM LF 6"
± 57 ST
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
ST-4.1
ST
ST NEW BIORETENTION
± 75LF 12" SICPP @ 1.33%
599
24"X24" CB C
AREA #1 (± 375 SF)
RIM=599.00
600
E INV=595.08
UD
600
SW INV=595.08
600
ST
UD
2
599
UD
± 65LF 6" PCPP @ 0.00%
UD
ST
EXP: EXP:
UD
NEW BIORETENTION
N
UD
AREA #1A (± 160 SF)
A STORM 0+00
CERTIFICATE OF AUTHORIZATION NUMBER:
INSET 60
UD
2 0 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
UD
C301 SCALE: 1"=20' GEOLOGICAL: 0021659
UD
C
NEW PRIVATE
FIRE HYDRANT
UD
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
FS
UD
± 44LF 18" SICPP @ 0.89%
Sec. 7307, for any person, unless acting under the direction of a licensed
ST
ST-3.4
24"X24" CB architect, professional engineer, or land surveyor, to alter an item in any
UD
C0
RIM=599.62 way. If an item bearing the seal of an architect, engineer, or land surveyor
2 SW INV=597.32 is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
ST
ST
FS
date of such alteration, and a specific description of the alteration.
© 2024
2026 LaBella Associates
ST
ST
± 66LF 8" HDPE @ 0.25%
FS
±
C 0 26LF 10" SICPP @ 1.00%
600
CLEANOUT ST
SE INV=597.26
NEW 6" FIRE SERVICE
600
ST
UD G
600
NEW PLAYGROUND UD (AFTER BACKFLOW
ST
UD
UD
PREVENTOR)
HOME LEASING
FS
DRAIN @ 15 O.C.
PROPOSED
G
75 S CLINTON AVE SUITE 700,
ST
UD ROCHESTER, NEW YORK 14604
ST
PLAYGROUND UD
G
UD
UD
FS
UD
± 82LF 18" SICPP @ 0.89%
UD
UD
ST
UD
G
UD
ST
UD UD
UD
UD
UD
A STORM 1+00
UD
G
FS
ST
G
FS
ST
G
NEW BACKFLOW PREVENTOR (IN FS
MECHANICAL ROOM) FOR COMBINED
W W
G
SERVICE. DOMESTIC SERVICE WILL BE
PROPOSED
595
ST
METERED AFTER THE BACKFLOW.
W
G
3-STORY
596
CLEANOUT C±
0 26LF 8" SICPP @ 3.38%
ST
SE INV=596.51
597
BUILDING
G
W
598
ST
± 25,000 SF FOOTPRINT ± 27LF 18" SICPP @ 0.89%
G
CLEANOUT CLEANOUT BLDG INV=
BLDG INV= CLEANOUT CLEANOUT
FFE=600.75' WEST SENECA APARTMENTS
A SANITARY 0+00
NW INV=593.50 SW INV=593.90 SW INV=595.75
SW INV=595.08 SW INV=592.75 SE INV=594.38
G
NW INV=593.90
W
NW INV=592.75
99
CLEANOUT
SE INV=592.75
SE INV=593.90 C
2544 CLINTON ST,
SE5 INV=594.00 ST-3.3 WEST SENECA, NY 14224
G
± 48LF 10" SICPP @ 1.00% C0 C0 24"X24" CB
600 C0 ± 93LF 10" SICPP @ 1.34% C0 C0 C0
ST ST ST ST ST ST ST ST ST ST
SA
ST ST ST ST ST ST ST ST RIM=599.74
ST ST
± 50LF 10" SICPP @ 1.51% ± 91LF 10" SICPP @ 1.04%
ST
1 SW INV=595.86
W
60
G
SA
600
CONNECT INTO CLEANOUT NE INV=595.96
ST
B SA
SA
C0
EXISTING NW INV=594.85
±22' 6" PVC SDR-21 @ 2.00%
NITA
ST
SANITARY MAIN
SA
SAN CO
G
SAN CO
ST
A SANIT ±25' 6" PVC SDR-21 @ 1.00%
RY 1
ARY 3+ SA TYP.
68 ±45' 6S"A TYP. C0
W
± 64LF 10" SICPP @ 1.25%
C0
PVC SDSA SA ±12' 6" PVC SDR-21 @ 12.59%
ST
+56
600
A STORM 2+00
R-21 @SA
SA
± 70LF 10" SICPP @ 1.00%
G
2 .88% SA S SA SA SA SA SA SA SA SA SA SA SA SA SA C0
±36' 6" PVC SDR-21 @ 1.00% SA SA SA SA SA SA SA SA SA SA SA SA
ST
SA SA SA SA SA SA SA SA
A SANITARY 3+00 A SANITARY 2+00 ±242' 6" PVC SDR-21 @ 1.00%
SAN 2 7/27/2026 PLANNING BOARD COMMENTS
CO
± 104LF 18" SICPP @ 0.82%
CLEANOUT
ST
INV=594.41 A SANITARY 1+00
SAN 1.0 4' DIA.
SA
RIM=593.62 TYP. SAN CO 1 06/23/2026 PLANNING BOARD COMMENTS
G
ST
RIM=594.70 C0
WYE THRU NW INV=593.08 TYP.
W
NO: DATE: DESCRIPTION:
NW INV=587.00 SE INV=593.08
SA
ST
SE INV=592.72 Revisions
G
E INV=593.08
ST
S INV=593.99
595
SA
ST
ST-2.0
B:\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
4' DIA. MH PROJECT NUMBER:
G
596
W
2241067
ST
RIM=599.29
SA
ST
597
SE INV=593.10 ST-3.0
599
599
4' DIA. MH
G
W INV=593.20 DRAWN BY:
ST
±123' 4" PVC SDR-21 @ 2.00%
B SA
600
598
RIM=599.33 EMM / JBB
SA
NITA
NW INV=593.00
REVIEWED BY:
W
B STORM 1+00
ST
± 5LF 18" SICPP @ 2.02% S INV=593.10 SRV / DPB
G
RY 1
B STORM 1+06
599
599
SA
D D
NE INV=593.20
± 5LF 12" SICPP @ 2.01% 599
+00
M 4+00 ± ISSUED FOR:
± 51LF 12" SICPP @ 2.48% ST-1.1 A STOR 36
SITE PLAN APPROVAL
G
ST
SA
LF ST
59
4' DIA. MH 18
9
ST
± 31LF 18" SICPP @ 0.65% " SIC
W
ST-2.2 RIM=599.04
PP DATE:
SA
24"X24" CB NW INV=590.30 @ ST
G
ST
599 4/20/2026
RIM=598.62
B STORM 0+00 SE INV=590.40 1.0
RIPRAP OUTLET 0
SE INV=594.77 SAN CO M 5+00 %
A STOR
ST ST ST
SA
C C
CONTROL (TYP.) TYP. C ST ST ST ST ST ST C
DRAWING NAME:
G
ST ST ST ST ST ST ST ST ST C0 D D ± 86LF 18" SICPP @ 1.56%
A STORM 3+00
W
A STORM 6+89 A STORM 6+00 ± 5LF 12" SICPP @ 2.01% ST-3.2
SA
± 122LF 12" SICPP @ 0.37%
ST-2.1 ST-3.1 24"X24" CB
END SECTION ± 9LF 12" SICPP @ 1.15%
G
24"X24" CB 24"X24" CB RIM=598.47
INV= 589.75 ST-1.0
SA
599 RIM=598.87 RIM=598.89 NW INV=594.90
E INV=593.40 ADS BARRACUDA MAX S6 WQU N INV=593.46 NE INV=595.00
ADS STORMTECH CHAMBER
W
G
NW INV=593.50 RIM=599.00 SE INV=593.56 599 NEW 6" COMBINED
UTILITY PLAN
SA
E INV=590.20 SYSTEM SC-3500 WATER SERVICE
NEW PRIVATE
W INV=590.20 (120 CHAMBERS)
FIRE HYDRANT
G
STONE INV=590.50
SA
MATCH TO SHEET: C302 CHAMBER ELEVATION=591.25
W
SA
G
FS
600
G
DRAWING NUMBER:
W
SA
±12' 4" PVC SDR-21 @ 2.00% C0
G
600
UTILITY PLAN NOTES:
7/27/2026 8:57:03 AM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PLAN 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C301
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C301 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 338 of 1174
Page 339
SA
599 RIM=598.87 RIM=598.89 NW INV=594.90
E INV=593.40 ADS BARRACUDA MAX S6 WQU N INV=593.46 24
NE INV=595.00
NOT FOR CONSTRUCTION
ADS STORMTECH CHAMBER
W
G
NW INV=593.50 RIM=599.00 SE INV=593.56 599 NEW 6" COMBINED
SA
E INV=590.20 SYSTEM SC-3500 WATER SERVICE
NEW PRIVATE
W INV=590.20 (120 CHAMBERS)
FIRE HYDRANT
G
STONE INV=590.50
SA
MATCH TO SHEET: C301 CHAMBER ELEVATION=591.25
W
SA
G
300 Pearl Street, Suite 130
FS
600 Buffalo, NY 14202
G
716-551-6281
W
SA
±12' 4" PVC SDR-21 @ 2.00% C0
G
SAN CO NEW 6" FIRE SERVICE 600 labellapc.com
B SANITARY 0+00
FS
TYP. (AFTER BACKFLOW
G
PREVENTOR)
598
W
599
598
599
BLDG INV=
599
DS
NE INV=596.70
G
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
W
G
G
W
G
EXP: EXP:
G
W
CERTIFICATE OF AUTHORIZATION NUMBER:
G
DS PROFESSIONAL ENGINEERING: 0021272
NEW BACKFLOW PREVENTOR LAND SURVEYING: 0021271
598 G
(IN MECHANICAL ROOM) FOR GEOLOGICAL: 0021659
W
COMBINED SERVICE.
597
DOMESTIC SERVICE WILL BE
597
NEW 2' WIDE
G
598
METERED AFTER THE GRAVEL DIAPHRAGM It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
BACKFLOW. NEW BIORETENTION G Sec. 7307, for any person, unless acting under the direction of a licensed
600
W
AREA #2 (± 370 SF) C0 architect, professional engineer, or land surveyor, to alter an item in any
G
UD
way. If an item bearing the seal of an architect, engineer, or land surveyor
ST-5.2
G is altered; the altering architect, engineer, or land surveyor shall affix to
24"X24" CB 599 UD W
the item their seal and notation "altered by" followed by their signature and
RIM=597.00 5 98 UD G
597 UD date of such alteration, and a specific description of the alteration.
W INV=592.58
96.50 UD W
E INV=592.58 559 6 UD
G
UD
UD UD G © 2024
2026 LaBella Associates
UD00 UD
UD 0+
UD W
60 C
ORM 5 9 6 .50
W
0 C ST 596 7
G
ST 59
NEW 6" COMBINED 598 G
ST
W
WATER SERVICE
G
ST
W W W W W W W W W W W
HOME LEASING
T
W G
ST
.49% 600
ST PP @0 G
75 S CLINTON AVE SUITE 700,
SIC
F 12" W
ST-5.0 ST
± 134L G ROCHESTER, NEW YORK 14604
4' DIA. MH ST 00 G
RIM=598.95 OR M 1+
NW INV=591.20 ST C ST W 598
G
E INV=591.92 ST
S INV=591.30 G
W
59 597
T
D
ST 9
G
596
ST
±3
ST
ST
ST
0LF
ST W G 6
C STORM 2+00 59 7
ST
ST
ST
" SICPP @ 1.01
% 59 8
12"
ST
ST
RIPRAP OUTLET ST
ST ± 217LF 12 G 59
SIC
598
ST ST-5.1
ST 598 NEW 6" COMBINED W
CONTROL (TYP.) C STORM 3+00
PP
ST G
ST NEW 2' WIDE 24"X24" CB WATER SERVICE
ST
@0
GRAVEL DIAPHRAGM 596 RIM=596.00
C STORM 3+70 G PROPOSED SWALE
.93%
N INV=591.58 W
END SECTION 595 460 LF @ 1.0%
UD UD UD C
NW INV=591.58 G
INV= 589.00 C0 UD UD UD UD UD BOTTOM WIDTH 1' MIN.
UD 0.00%
± 66LF 6" PCPP @
UD UD UD
G
T
UD
W
UD
UD
±
UD
27L
UD
F1 G
595 ST ES-5 2" ST
SIC W
SE INV=585.58 PP G
NEW BIORETENTION @
0.9
5% G
C
AREA #3 (± 700 SF)
G
9
59
W
ST-5.3
G
595.50 24"X24" CB
596 RIM=598.85
WEST SENECA APARTMENTS
T
NW INV=585.84
598
G
2544 CLINTON ST,
598
597
596
W
595
595
596
597
WEST SENECA, NY 14224
598
RIPRAP OUTLET
G
CONTROL (TYP.) ST ST ST ST ST ST ST ST ST ST ST C
ST ST ST ST ST ST ST ST ST ST ST ST D ST ST
± 169LF 15" SICPP @ 1.48% ± 179LF 15" SICPP @ 0.98% D STORM 0+00
D STORM 3+00 D STORM 2+00 D STORM 1+00
D STORM 3+68
END SECTION
W
G
2 ST-6.0 ST-6.1
T
INV= 587.50
4' DIA. MH 2 30"X30" CB
RIM=598.30 RIM=594.35
598
G
NW INV=590.00 NW INV=591.85
SE INV=590.10
W
G
2 7/27/2026 PLANNING BOARD COMMENTS
1 06/23/2026 PLANNING BOARD COMMENTS
G
T
NO: DATE: DESCRIPTION:
W
Revisions
G
B:\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
PROJECT NUMBER:
2241067
G
W
DRAWN BY:
EMM / JBB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
CONNECT TO EXISTING 6" SITE PLAN APPROVAL
WATERMAIN WITH TS&V
DATE:
4/20/2026
DRAWING NAME:
UTILITY PLAN
DRAWING NUMBER:
UTILITY PLAN NOTES:
7/27/2026 8:56:39 AM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PLAN 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C302
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C302 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 339 of 1174
Page 340
NOT FOR CONSTRUCTION
599
CONSTRUCTION SEQUENCE LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
1. SUBMIT EROSION CONTROL MEASURES AND SEQUENCING 13. DEWATER EXCAVATIONS AS NECESSARY. PUMPED WATER
FOR REVIEW AND APPROVAL BY THE QUALIFIED INSPECTOR. SHALL BE TREATED TO REMOVE SEDIMENT PRIOR TO
DISCHARGE.
2. INSTALL STABILIZED CONSTRUCTION ENTRANCE.
14. RESTORE TO FINISHED GRADE AS TRENCH BACKFILLING LO
3. INSTALL CONSTRUCTION AREA AND STAGING AREA FENCING.
PROGRESSES. MAINTAIN PROPER SITE DRAINAGE TO
D 300 Pearl Street, Suite 130
598
D
LO
4. INSTALL PERIMETER SEDIMENT CONTROLS PROTECT WORK AREA, ADJACENT PROPERTIES, SWALES, Buffalo, NY 14202
AND OTHER WATERCOURSES. 716-551-6281
5. PROTECT EXISTING VEGETATION AND OTHER 594.92
ST-4.0
ENVIRONMENTAL FEATURES TO BE PRESERVED WITH 15. BOX OUT AREAS FOR ROADS, PARKING AREAS, AND
599 24"X24" CB labellapc.com
LOD
ORANGE CONSTRUCTION FENCE OR TREE PROTECTION. BUILDING PADS. AS UTILITY REPLACEMENTS ARE D 600
LO CLEANOUT RIM=599.00
COMPLETE, PREPARE THE ROADWAY AND SIDEWALK 600
6. CLEAR AND GRUB TREES, BRUSH, SHRUBS, AND OTHER
-9.21%
SUBGRADE AS REQUIRED, INSTALL GEOTEXTILES, STONE SE INV=594.51 599
DEBRIS WITHIN DESIGNATED AREAS. AND CURBING. W INV=594.51 598
LOD 600 C0
UD UD UD UD UD UD UD UD UD UD UD
7. REMOVE AND PROPERLY DISPOSE OF ASPHALT AND
C
NEW 2' WIDE
16. INSTALL CONCRETE WASHOUT AREA. NO WET OR FRESH NEW 2' WIDE
E STORM 0+00
CONCRETE PAVEMENT AND OTHER ITEMS DESIGNATED FOR GRAVEL DIAPHRAGM
CONCRETE, WASHINGS FROM CONCRETE TRUCKS, MIXERS GRAVEL DIAPHRAGM
LO
LOD
REMOVAL. OR OTHER DEVICES, OR CONCRETE LEACHATE SHALL BE D INSTALL AND MAINTAIN
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
ST-4.1
ALLOWED TO ESCAPE INTO ANY WATERS. TEMPORARY SILT SOCK NEW BIORETENTION
8. INSTALL ADDITIONAL EROSION AND SEDIMENT CONTROLS 24"X24" CB C 600.05
600.32 AREA #1 (± 375 SF)
ACCORDING TO PLAN. INSPECT, CLEAN, AND MAINTAIN RIM=599.00 600.05
600
17. POUR CONCRETE SIDEWALKS, GUTTERS, PADS, ETC. AS
-1.56%
EROSION CONTROL MEASURES AS NECESSARY AND AS
UD
SHOWN ON THE CONTRACT DOCUMENTS.
-1.6
600
-1.
ORDERED BY THE QUALIFIED INSPECTOR. SWEEP PUBLIC OR
600
1
LOD
5
1%
UD
18. COMPLETE GRADING, REAPPLY TOPSOIL, INSTALL
%
PRIVATE ROADWAYS, DRIVES AND PARKING AREAS AS 600.50
LOD
599
NECESSARY TO MAINTAIN CLEAN FROM DEBRIS. RELOCATE PERMANENT SEEDING, FERTILIZER, AND MULCH.
UD
600.25 600.55
AND RESET EROSION CONTROL MEASURES AND
19. COMPLETE FINAL PAVING. 600.52
-2
CONSTRUCTION FENCING AS REQUIRED TO COMPLETE
UD
.7
9%
WORK. ALL APPROPRIATE EROSION AND SEDIMENT 20. CAPTURE, REMOVE, AND DISPOSE OF ACCUMULATED SILT 2 EXP: EXP:
UD
CONTROL MEASURES SHALL BE IN PLACE AND FUNCTIONAL OR SEDIMENT FROM SILT FENCE AND INLET PROTECTION.
NEW BIORETENTION
LOD
BEFORE COMMENCEMENT OF CONSTRUCTION OF ANY
UD
21. CLEAN THE SITE OF ALL INCIDENTAL CONSTRUCTION AREA #1A (± 160 SF)
A STORM 0+00
SEGMENT OF THE PROJECT THAT REQUIRES SUCH
LOD
MATERIALS THAT ARE NOT INCORPORATED INTO THE WORK, CERTIFICATE OF AUTHORIZATION NUMBER:
60
UD
MEASURES. 0 PROFESSIONAL ENGINEERING: 0021272
AND PROPERLY DISPOSE OFFSITE.
600.10 LAND SURVEYING: 0021271
9. STRIP AND STOCKPILE TOPSOIL AND GRADE SITE. PROVIDE
UD
22. SEED, MULCH AND FERTILIZE TO ESTABLISH VEGETATION AT 600.50 GEOLOGICAL: 0021659
SILT FENCE SURROUNDING TOPSOIL STOCKPILES.
DISTURBED AREAS NOT DESIGNATED FOR PAVEMENT OR
UD
C
10. INSTALL CHECK DAMS ALONG GRADED SWALES. OTHER SURFACES. WHERE SEED DOES NOT GERMINATE, OR
LOD
UD
WHERE WASH OUT, EROSION, RUTTING OR OTHER DAMAGE 600.39 TC 600.10
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
LOD
11. STABILIZE DENUDED AREAS AND STOCKPILES WITHIN 14 599.89 BC
OCCURS, REPAIR DAMAGE, RE-SEED AND RE-FERTILIZE AS
UD
DAYS OF LAST CONSTRUCTION ACTIVITY IN EACH AREA. ST-3.4 Sec. 7307, for any person, unless acting under the direction of a licensed
NECESSARY TO ACHIEVE 80% GERMINATION OVER 100% OF 600.84 TC
24"X24" CB architect, professional engineer, or land surveyor, to alter an item in any
600.34 BC
UD
12. INSTALL UTILITIES AND STORM SEWER. EXCESS MATERIALS THE SITE. C0
RIM=599.62 way. If an item bearing the seal of an architect, engineer, or land surveyor
NOT BACKFILLED IN UTILITY TRENCHES SHALL BE REMOVED -1.58 is altered; the altering architect, engineer, or land surveyor shall affix to
23. REMOVE ALL TEMPORARY EROSION CONTROL PRACTICES
D
%
LO
FROM THE SITE OR SPOILED IN AREAS APPROVED BY THE the item their seal and notation "altered by" followed by their signature and
UPON APPROVAL OF FINAL STABILIZATION BY THE QUALIFIED
OWNER. EROSION CONTROL MEASURES ARE NOT REQUIRED date of such alteration, and a specific description of the alteration.
INSPECTOR.
LOD
AROUND SOILS (EARTHEN MATERIALS) EXCAVATED, SIDE
CAST AND BACKFILLED INTO THE TRENCH WITHIN THE SAME
DAY. © 2024
2026 LaBella Associates
D
LO
600
C0
CLEANOUT
SE INV=597.26
LOD
INSTALL AND MAINTAIN
600
UD
600
TEMPORARY SILT FENCE D UD
NEW PLAYGROUND LO
DRAIN @ 15 O.C. UD
UD
HOME LEASING
LOD
PROPOSED 600.65
600.45 -1.5
8%
75 S CLINTON AVE SUITE 700,
ANTICIPATED UD ROCHESTER, NEW YORK 14604
±5.44 ACRES
PLAYGROUND UD
UD
LOD
UD
DISTURBANCE D UD
LO UD
LOD LOD LOD UD
UD
UD
UD UD
UD
LOD UD
LOD UD 600.78 TC
A STORM 1+00
UD 601.23 TC
LOD 600.28 BC
600.73 BC
LOD
LOD
INSTALL AND MAINTAIN
LOD
LOD
TEMPORARY SILT FENCE
TEMPORARY
PROPOSED
595
SOIL STOCK PILE
3-STORY
596
CLEANOUT C0
SE INV=596.51
597
LOD
LOD
BUILDING -1.50%
598
± 25,000 SF FOOTPRINT CLEANOUT CLEANOUT BLDG INV=
BLDG INV= CLEANOUT CLEANOUT
FFE=600.75' WEST SENECA APARTMENTS
A SANITARY 0+00
NW INV=593.50 SW INV=593.90 SW INV=595.75
SW INV=595.08 SW INV=592.75 SE INV=594.38
LOD
NW INV=593.90
LOD
NW INV=592.75 600.92C TC
99
CLEANOUT
SE INV=592.75
SE INV=593.90
600.42 BC
2544 CLINTON ST,
SE5 INV=594.00 600.91 TC
ST-3.3 600.41 BC WEST SENECA, NY 14224
C0 24"X24" CB
600 C0 C0 C0 C0 600.14
C0
RIM=599.74
1
60
600
LOD
CLEANOUT
B SA
LOD
C0
NW INV=594.85
600.98 TC 600.73 TC 600.67 TC 600.68 TC 600.79 TC 600.50 TC
NITA
SAN CO 600.17 BC 600.18 BC 600.29 BC 600.11 600.00 BC 599.09 HP
600.48 BC 600.23 BC
SAN CO
-1.7
-1.1
A SANIT 600.63 TC 600.63 TC
RY 1
ARY 3+ TYP. 600.27
68 TYP. 600.13 BC
6%
2%
C0 600.13 BC
-1.17%
C0
+56
600
A STORM 2+00
-1.14%
S 600.63 TC
C0
-1.7
600.13 BC %
LOD
A SANITARY 3+00 A SANITARY 2+00 SAN CO .96 2 7/27/2026 PLANNING BOARD COMMENTS
CLEANOUT -1
2%
A SANITARY 1+00
LOD
SAN 1.0 4' DIA. RIM=593.62 TYP. SAN CO 1 06/23/2026 PLANNING BOARD COMMENTS
600.04 C0
599.87
RIM=594.70 WYE THRU NW INV=593.08 TYP. NO: DATE: DESCRIPTION:
NW INV=587.00 SE INV=593.08
Revisions
-1.98%
SE INV=592.72 E INV=593.08
S INV=593.99
595
%
LOD
-1.6
B:\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C400 GRADING PLAN.dwg
ST-2.0
-1.46
6%
-1.29%
599.92 TC 600.13 TC 599.91 TC 599.59 TC PROJECT NUMBER:
LOD
5
-1.2
4' DIA. MH
596
599.63 BC 599.41 BC
%
599.42 BC 599.09 BC
RIM=599.29 2241067
597
ST-3.0
599
599
599.49 TC 4' DIA. MH DRAWN BY:
B SA
600
598
598.99 BC RIM=599.33 EMM / JBB
NITA
LOD
B STORM 1+00 REVIEWED BY:
SRV / DPB
RY 1
B STORM 1+06
599
599
LOD
D D
599
+00
M 4+00 ISSUED FOR:
ST-1.1 A STOR
SITE PLAN APPROVAL
59
4' DIA. MH
9
ST-2.2 RIM=599.04
% DATE:
56
24"X24" CB -1.
3%
LOD
599 4/20/2026
8%
RIM=598.62 598.89
-1.6
B STORM 0+00
-1.2
RIPRAP OUTLET
M 5+00
LOD
SAN CO
A STOR
C C
CONTROL (TYP.) LOD LOD TYP. C C
DRAWING NAME:
599.34 TC C0 599.72 TC 599.32 TC 599.05 TC
LOD
D D
A STORM 3+00
-2
LOD 599.22 BC 598.82 BC 598.55 BC
A STORM 6+00598.84 BC
.1
A STORM 6+89 ST-3.2 599.16
2%
ST-2.1 ST-3.1 24"X24" CB
END SECTION
24"X24" CB 24"X24" CB RIM=598.47
INV= 589.75
%
ST-1.0
599.48 TC 599 RIM=598.87 RIM=598.89
-1.58
598.98 BC ADS BARRACUDA MAX S6 WQU
LOD
RIM=599.00 ADS STORMTECH CHAMBER 599 GRADING, EROSION, AND
%
599.48 599.62 SYSTEM SC-3500
LOD
-1.58
-1.50%
-1.50%
(120 CHAMBERS)
SEDIMENT CONTROL PLAN
8%
0%
-1.6
9%
MATCH TO SHEET: C402
-1.5
-1.5
%
599.80 599.84
-1.58
600.37 TC 600.45 TC 600.44 TC 600.11 TC 600.02 TC 599.80 TC
LOD
599.98 TC 600.27 TC
599.77 BC 599.87 BC 599.95 BC 599.94 BC 599.61 BC 599.52 BC 599.30 BC
599.48 BC
LOD
600
600.17 DRAWING NUMBER:
599.19 599.46
C0
600
7/27/2026 8:56:20 AM
N GRADING NOTE
1
GRADING, EROSION, AND SEDIMENT CONTROL PLAN 0' 20' 40' 60'
C401
1. A 5-ACRE WAIVER HAS NOT BEEN OBTAINED. CONTRACTOR SHALL NOT DISTURB GREATER THAN 5-ACRES WITHOUT WRITTEN
C401 SCALE: 1" = 20' APPROVAL FROM ENGINEER, TOWN AND NYSDEC.
Page 340 of 1174
Page 341
Stormwater Pollution Prevention Plan
Prepared for:
Home Leasing
75 South Clinton Avenue, Suite 700,
Rochester, NY 14604
Submitted by:
LaBella Associates
300 Pearl Street, Suite 130
Buffalo, NY 14202
(716) 551-6281
West Seneca Apartments
Town of West Seneca, Erie County, New York
Date: April 2026
Last revised: July 2026
Project No. 2241067
Page 341 of 1174
Page 342
Page 342 of 1174
Page 343
PREPARER OF THE SWPPP
“I certify under penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.”
Name and Title1: Kristopher Winkler, PE
Date: Issued: April 2026
1 This is a signature of a New York State licensed Professional Engineer employed by LaBella Associates that is duly
authorized to sign and seal Stormwater Pollution Prevention Plans (SWPPPs), NOIs, and NOTs prepared under their direct
supervision. Refer to Appendix B for the SWPPP Preparer Certification Form, and Appendix I for the LaBella Certifying
Professionals Letter.
Page 343 of 1174
Page 344
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY .................................................................................................................... 1
1.1 Project Description ................................................................................................................... 1
1.2 Stormwater Pollution Controls................................................................................................. 2
2.0 SITE CHARACTERISTICS .................................................................................................................. 3
2.1 State Environmental Quality Review ....................................................................................... 3
2.2 Land Use and Topography ....................................................................................................... 3
2.3 Soils and Groundwater............................................................................................................. 3
2.4 Watershed Designation ........................................................................................................... 4
2.5 Receiving Water Bodies ........................................................................................................... 4
2.6 Aquifer Designation .................................................................................................................. 4
2.7 Wetlands ................................................................................................................................... 4
2.8 Flood Plains .............................................................................................................................. 4
2.9 Listed, Endangered, or Threatened Species .......................................................................... 5
2.10 Historic Places........................................................................................................................ 5
2.11 Rainfall Data........................................................................................................................... 5
2.12 Pre-development Watershed Conditions .............................................................................. 5
2.13 Post-development Watershed Conditions ............................................................................ 6
2.14 Description of Design Points ................................................................................................. 6
3.0 STORMWATER MANAGEMENT PLANNING .................................................................................... 6
3.1 STEP 1 – Site Planning ............................................................................................................ 7
3.2 STEP 2 – Calculate Water Quality Treatment Volume (WQv) ................................................ 7
3.3 STEP 3 – Apply RR Techniques and Standard SMPs with RRv Capacity to Reduce
Total WQv......................................................................................................................................... 8
3.4 STEP 4 – Calculate the Minimum RRv Required.................................................................... 9
3.5 STEP 5 – Apply Standard SMPs to Address Remaining Water Quality Volume.................... 9
3.6 STEP 6 - Apply Volume and Peak Rate Control .................................................................... 11
3.7 Climate Change Consideration .............................................................................................. 13
4.0 CONSTRUCTION SEQUENCE ......................................................................................................... 14
5.0 CONSTRUCTION-PHASE POLLUTION CONTROL ........................................................................... 14
5.1 Temporary Erosion and Sediment Control Measures .......................................................... 15
5.2 Permanent Erosion and Sediment Control Measures ......................................................... 17
5.3 Implementation Schedule for Erosion and Sediment Control Measures ........................... 17
Page 344 of 1174
Page 345
5.4 Other Pollutant Controls......................................................................................................... 18
5.5 Construction Housekeeping Practices .................................................................................. 21
6.0 INSPECTIONS, MAINTENANCE, AND REPORTING ....................................................................... 22
6.1 Inspection and Maintenance Requirements ........................................................................ 22
6.2 Reporting Requirements ........................................................................................................ 24
7.0 SWPPP IMPLEMENTATION RESPONSIBILITIES ........................................................................... 26
7.1 Owner’s/Operator's Responsibilities..................................................................................... 26
7.2 Owner’s/Operator’s Engineer’s Responsibilities.................................................................. 29
7.3 Contractor's Responsibilities ................................................................................................. 30
7.4 Qualified Inspector’s/Qualified Professional’s Responsibilities ......................................... 31
7.5 SWPPP Participants ............................................................................................................... 33
LIST OF TABLES
Table 1: USDA Soil Data .............................................................................................................................. 3
Table 2: Project Site HSG Data ................................................................................................................... 3
Table 3: Rainfall Data .................................................................................................................................. 5
Table 4: Required WQv Treatment by Alternative Practice ....................................................................... 8
Table 5: WQv Required Summary ............................................................................................................... 8
Table 6: Summary of Standard SMPs with RRv Capacity being Applied .................................................. 9
Table 7: RRv Summary ................................................................................................................................ 9
Table 8: Summary of WQv Provided ......................................................................................................... 10
Table 9: Summary of Hydrodynamic Unit(s) ............................................................................................. 11
Table 10: Design Events ............................................................................................................................ 13
Table 11: CPv Summary ............................................................................................................................ 13
Table 12: Summary of Pre- and Post-Development Peak Discharge Rates ........................................... 13
Table 13: Implementation Schedule for Erosion and Sediment Control Measures .............................. 18
Table 14: Common Construction Pollutants ............................................................................................ 20
Page 345 of 1174
Page 346
APPENDICES
Appendix A: Figures
• A-1: Site Location Map
• A-2: Soils Map
• A-3: Historic Places Screening Map
• A-4: Environmental Resource Map
• A-5: FEMA Firm Map
• A-6: Pre-Development Watershed Delineation Map (Pocket)
• A-7: Post-Development Watershed Delineation Map (Pocket)
Appendix B: Forms
• Notice of Intent (NOI)
• MS4 SWPPP Acceptance Form
• SWPPP Preparer Certification Form
• Owner/Operator Certification Form
• Contractor and Subcontractor Certification Forms
• Notice of Termination (NOT)
Appendix C: Project Evaluation and Design Calculations
Appendix D: Pre-Development Stormwater Modeling
Appendix E: Post-Development Stormwater Modeling
Appendix F: SWPPP Inspection Report (Sample Form)
Appendix G: Post-Construction Inspections and Maintenance
Appendix H: NYSDEC “Deep-Ripping and Decompaction,” April 2008
Appendix I: LaBella Certifying Professionals Letter
Appendix J: NYSDEC SPDES General Permit GP-0-25-001
Page 346 of 1174
Page 347
1.0 EXECUTIVE SUMMARY
This Stormwater Pollution Prevention Plan (SWPPP) has been prepared for major activities associated
with construction of a 75-unit affordable housing complex and related site work in the Town of West
Seneca. This SWPPP includes the elements necessary to comply with the national baseline general
permit for construction activities enacted by the U.S. Environmental Protection Agency (EPA) under the
National Pollutant Discharge Elimination System (NPDES) program and all local governing agency
requirements. This SWPPP must be executed, and permit coverage must be obtained prior to the
commencement of construction activity.
This SWPPP has been developed in accordance with the “New York State Department of Environmental
Conservation (NYSDEC) State Pollutant Discharge Elimination System (SPDES) General Permit for
Stormwater Discharges from Construction Activity,” Permit No. GP-0-25-001, effective January 29,
2025 through January 28, 2030. The SWPPP and accompanying plans identify and detail stormwater
management, pollution prevention, and erosion and sediment control measures necessary during and
following completion of construction.
This SWPPP and the accompanying plans entitled “West Seneca Apartments” have been submitted as
a set. These engineering drawings are considered an integral part of this SWPPP. Therefore, this
SWPPP is not considered complete without them. References made herein to “the plans” or to a
specific “sheet” refer to these drawings.
This report considers the impacts associated with the intended development with the purpose of:
1. Maintaining existing drainage patterns as much as possible while continuing the conveyance
of upland watershed runoff;
2. Controlling increases in the rate of stormwater runoff resulting from the proposed development
so as not to adversely alter downstream conditions; and
3. Mitigating potential stormwater quality impacts and preventing soil erosion and sedimentation
resulting from stormwater runoff generated both during and after construction.
The analysis and design completed and documented in this report is intended to be part of the
application made for a multi-family residential redevelopment project with an increase in impervious
area completed on behalf of the Owner/Operator.
1.1 Project Description
Home Leasing is proposing redevelopment project with an increase in impervious area, to include: 75-
unit affordable housing building, associated parking, sidewalks, and landscaping. The total project
area of disturbance proposed is 5.44 acres. The project will disturb one (1) or more acres and as
such, preparation of this SWPPP is required under GP-0-25-001. A Site Location Map has been
provided in Appendix A, as Figure A-1.
This type of project is included in Table 2 of Appendix B of GP-0-25-001; and the project site is not
located in one of the watersheds listed in Appendix C of GP-0-25-001. Therefore, this SWPPP includes
post-construction stormwater management practices, as well as erosion and sediment controls.
project is located within the Town Of West Seneca regulated, traditional land use control Municipal
Separate Stormwater Sewer System (MS4). Therefore, an MS4 SWPPP Acceptance Form is required
to accompany NOIs submitted to the NYSDEC.
Stormwater Pollution Prevention Plan
Page 1
2241067
Page 347 of 1174
Page 348
Runoff from the project site will discharge to the Cayuga Creek, which is not included in the list of
Section 303(d) water bodies included in Appendix D of GP-0-25-001.
Project construction activities will consist primarily of site grading, paving, building construction, and
the installation of storm drainage, water supply, sanitary sewer, and public utility infrastructure
necessary to support the proposed redevelopment project with an increase in impervious area.
Construction phase pollutant sources anticipated at the site are disturbed (exposed) soil, vehicle fuels
and lubricants, chemicals associated with building construction, and building materials. Without
adequate control there is the potential for each type of pollutant to be transported by stormwater.
1.2 Stormwater Pollution Controls
The stormwater pollution controls outlined herein have been designed and evaluated in accordance
with the following standards and guidelines:
• New York State Stormwater Management Design Manual, dated July 31, 2024 (Design
Manual).
• New York State Standards and Specifications for Erosion and Sediment Control, dated
November 2016 (SSESC).
• Town of West Seneca Town Code (2025-09-08) - Chapter 102A Stormwater Management and
Erosion and Sediment Control
Stormwater quality will be enhanced through the implementation of temporary and permanent erosion
and sediment control measures, the proposed stormwater management practice(s), and other
construction-phase pollution controls outlined herein.
The proposed stormwater management approach consisting of pipes, open drainage ways, and on-
site stormwater management practices will adequately collect, treat, and convey the stormwater
runoff.
Bioretentions and a water quality unit will be used to manage and treat stormwater runoff generated
by the proposed redevelopment project with an increase in impervious area.
Pre- and post-development surface runoff rates have been evaluated for the 1-, 10-, 25-, and 100-year
24-hour storm events. Comparison of pre- and post-development watershed conditions demonstrates
that the peak rate of runoff from the project site will not be increased.
The pollutant loading analysis indicates stormwater quality will be enhanced through the
implementation of the proposed stormwater management practices outlined herein.
The post-construction stormwater management practice(s) will be privately owned by Home Leasing.
Deed restrictions will be in place, which require operation and maintenance of the practice(s) in
accordance with the operation and maintenance plan.
Stormwater Pollution Prevention Plan
Page 2
2241067
Page 348 of 1174
Page 349
2.0 SITE CHARACTERISTICS
2.1 State Environmental Quality Review
The construction activity is subject to State Environmental Quality Review (SEQR). The project is
considered a Unlisted action. As such, SEQR coordination has been completed. Negative Declaration
issued on 1/27/2025, amended on 2/9/2026. A copy of the SEQR documentation, in accordance
with Part I.A.5. of GP-0-25-001, is provided in Appendix A, as Figure A-5 upon receipt.
2.2 Land Use and Topography
The project site is located within the R-50 zoning district. Multiple-family dwellings is a permitted use
subject to a special use permit within this district. Special Use Permit was obtained on 2/9/2026.
The overall site is slightly sloping, with slopes ranging from 1 to 10 percent. Site elevations range from
approximately 580 feet above mean sea level (MSL) to 600 feet MSL. The site generally slopes to the
north and the west towards Cayuga Creek.
2.3 Soils and Groundwater
The US Department of Agriculture (USDA) Web Soil Survey (http://websoilsurvey.nrcs.usda.gov/app/)
was used to obtain surficial soil conditions for the study area, as follows:
Table 1: USDA Soil Data
Depth to Depth to
Hydrologic Erosion
Map Symbol & Description Water Table Bedrock
Soil Group Factor K
(feet) (feet)
Fu - Fluvaquents and Udifluvents, frequently
A/D 0.17 0.50 >6.0
flooded
GaA - Galen very fine sandy loam, 0 to 3
A/D 0.37 1.75 >6.0
percent slopes
GaB - Galen very fine sandy loam, 3 to 8
A/D 0.37 1.75 >6.0
percent slopes
Te – Teel silt loam B/D 0.37 1.75 >6.0
Upon review of the soil data presented in Table 1, the project site does not contain soils with a soil
slope phase of D with a map unit name that inclusive of slopes greater than 25%, and does not contain
soils with a soil slope phase of E or F.
The project site is composed of HSG A soils, HSG B soils, and HSG D soils, as shown in the table below.
For the purposes of this report, HSG X/D soils were modeled as HSG D soils to reflect the undrained
condition.
Table 2: Project Site HSG Data
HSG A HSG B HSG C HSG D
0% 0% 0% 100%
Stormwater Pollution Prevention Plan
Page 3
2241067
Page 349 of 1174
Page 350
The Soil Conservation Service defines the hydrologic soil groups as follows:
• Type A Soils: Soils having a high infiltration rate and low runoff potential when thoroughly wet.
These soils consist mainly of deep, well drained to excessively drained sands or gravelly sands.
These soils have a moderate rate of water transmission.
• Type B Soils: Soils having a moderate infiltration rate when thoroughly wet and consisting
mainly of moderately deep to deep, moderately well to well drained soils with moderately fine
to moderately course textures. These soils have a moderate rate of water transmission.
• Type D Soils: Soils having a very low infiltration rate and high runoff potential when thoroughly
wet. These soils consist chiefly of clays that have high shrink-swell potential, soils that have a
permanent high water table, soils that have a clay pan or clay layer at or near the surface, and
soils that are shallow over nearly impervious material. These soils have a very low rate of water
transmission.
The soils map for the study area is presented in Appendix A, as Figure A-2.
2.4 Watershed Designation
The project site is not located in a restricted watershed identified in Appendix C of GP-0-25-001.
2.5 Receiving Water Bodies
The nearest natural classified water course into which runoff from the project site will discharge is
Cayuga Creek. Cayuga Creek is classified by NYSDEC as a Class C water course, and is not included
in the Section 303(d) list of impaired waters found in Appendix D of GP-0-25-001.
2.6 Aquifer Designation
The project site is not located over a US EPA designated Sole Source aquifer; nor is it located over a
Primary or Principal aquifer listed in the NYSDEC Technical and Operational Guidance Series (TOGS)
2.1.3 (1980).
2.7 Wetlands
A search on the NYSDEC Environmental Resource Mapper on April 16, 2026, and a review of GIS
data, determined that there are no known regulated wetlands located on or in the vicinity of the project
site. A wetland delineation is scheduled for Spring 2026 to field verify if there are any wetland on site.
2.8 Flood Plains
According to the National Flood Insurance Program Flood Insurance Rate Map (FIRM), Town of West
Seneca, New York. The project site lies within Flood Zone AE, areas of 0.2% annual chance flood; areas
of 1% annual chance flood with average depths of less than 1 foot or with drainage areas less than 1
square mile; and areas protected by levees from 1% annual chance flood, and Flood Zone X, areas
determined to be outside 500-year floodplain. No development is proposed to take place within the
100-year floodplain, therefore no floodplain development permit will be required. The FEMA Flood Map
has been provided in Appendix A, as Figure A-5.
Stormwater Pollution Prevention Plan
Page 4
2241067
Page 350 of 1174
Page 351
2.9 Listed, Endangered, or Threatened Species
A search was performed on the NYSDEC Environmental Resource Mapper on April 16, 2026, and
determined that the project site may contain threatened or endangered species, or critical habitat.
An Environmental Resource Map has been provided in Appendix A, as Figure A-4.
2.10 Historic Places
A search on the New York State Cultural Resource Information System (CRIS) database, performed on
April 16, 2026, revealed the construction activity is located within an archeologically sensitive area A
printout of the historic places screening map is presented in Appendix A, as Figure A-3. As such,
NYSOPRHP coordination has been completed and a Phase 1 Archeological Survey was conducted on
June 22, 2023 by archeologist. A copy of the NYSOPRHP documentation, in accordance with Part I.A.4.
of GP-0-25-001, is provided in Appendix A, as Figure A-3A upon receipt.
2.11 Rainfall Data
Rainfall data utilized in the modeling and analysis was obtained from the Cornell University online
Extreme Precipitation in New York & New England website (http://precip.eas.cornell.edu/). A local IDF
file was imported, and specific mass curves were generated, in HydroCAD to evaluate the pre- and
post-development stormwater runoff characteristics. Rainfall data specific to the portion of Erie
County under consideration, for various 24-hour storm events, is presented in the following Table:
Table 3: Rainfall Data
Storm Event 24-Hour Rainfall
Return Period (inches)
1-year 1.82
10-year 3.14
100-year 5.22
2.12 Pre-development Watershed Conditions
The pre-development project site is covered predominantly by buildings, pavement, grass, and woods.
Analysis of pre-development conditions considered existing drainage patterns, soil types, ground
cover, and topography. The Pre-Development Watershed Delineation Map has been provided in
Appendix A, as Figure A-5.
The results of the computer modeling used to analyze the overall watershed under pre-development
conditions are presented in Appendix D. A summary of the pre-development watershed runoff rates at
each Design Point is presented in Table 10.
Subcatchment one is a 7.74± acre watershed consisting of grass, pavement, and multiple buildings.
Runoff flows west overland via sheet and shallow concentrated flow toward Cayuga Creek west of the
site. This subcatchment is tributary to Design Point (AP) 1.
Subcatchment two is a 3.38± acre watershed consisting of grass and pavement. Runoff flows south
overland via sheet and shallow concentrated flow toward a swale and catch basin at the southeast
corner of the site. This subcatchment is tributary to Design Point (AP) 1.
Stormwater Pollution Prevention Plan
Page 5
2241067
Page 351 of 1174
Page 352
Subcatchment three is a 5.00± acre watershed consisting of off-site drainage including a forresed
area and grass. Runoff flows west overland via sheet and shallow concentrated flow toward a swale
and catch basin at the southeast corner of the site. This subcatchment is tributary to Design Point (AP)
1
2.13 Post-development Watershed Conditions
The post-development project site is covered predominantly by buildings, pavement, sidewalks, grass,
and woods. The analysis of post-development conditions considered existing drainage patterns, soil
types, ground cover to remain, planned site development, site grading, and stormwater management
facilities proposed as part of site improvements. The Post-Development Watershed Delineation Map
has been provided in Appendix A, as Figure A-6.
The results of the computer modeling used to analyze the overall watershed under post-development
conditions are presented in Appendix D. A summary of the post-development watershed runoff rates
at each Design Point is presented in Table 11.
There are numerous locations and methods for providing controls of off-site discharge of stormwater
from the project site. Each has been designed to provide the above quantity controls by attenuating
stormwater runoff and releasing runoff to off-site locations at a rate equal to or less than that which
existed prior to development of the site. Each device is detailed on the accompanying plans. A Post-
Development Watershed Delineation Map, with the tributary areas to each stormwater management
practice proposed, has been provided in Appendix A, as Figure A-6.
2.14 Description of Design Points
The study area consists of the 16.2 acre project site and 5.44 acre area of disturbance. The overall
watershed was broken down into smaller watersheds, or subcatchments, to allow for analysis of runoff
conditions at several locations throughout the study area. Each of these locations was defined as a
Design Point (DP) in order to compare the effects resulting from stormwater management facilities
proposed as part of the project. Descriptions of each of the selected Design Points are provided below.
• Design Point 1: Off-site discharge to Cayuga Creek
3.0 STORMWATER MANAGEMENT PLANNING
Chapter 3 of the Design Manual outlines a six-step planning process for site planning and selection of
stormwater management practices that must be implemented for both new development and
redevelopment projects. This process is intended to develop a design that maintains pre-construction
hydrologic conditions through the application of environmentally sound development principles, as
well as treatment and control of runoff discharges from the site. The following sections outline the
step-by-step process and how it has been applied to this project.
The goals of this Stormwater Management Plan are to analyze the peak rate of runoff under pre- and
post-development conditions, to maintain the pre-development rate of runoff in order to minimize
impacts to adjacent or downstream properties, and to minimize the impact to the quality of runoff
exiting the site.
Stormwater Pollution Prevention Plan
Page 6
2241067
Page 352 of 1174
Page 353
The Design Manual provides both water quality and water quantity objectives to be met by projects
requiring a “Full SWPPP”. These objectives will be met by applying stormwater control practices to limit
peak runoff rates and improve the quality of runoff leaving the developed site.
3.1 STEP 1 – Site Planning
During the Site Planning process, the project site is evaluated for implementation of the green
infrastructure planning measures identified in Table 3.1 of the Design Manual, in order to preserve
natural resources and reduce impervious cover. Appendix C provides a description of each green
infrastructure planning measure, along with a project specific evaluation.
3.2 STEP 2 – Calculate Water Quality Treatment Volume (WQv)
Stormwater runoff from impervious surfaces is recognized as a significant contributor of pollution that
can adversely affect the quality of receiving water bodies. Therefore, treatment of stormwater runoff
is important since most runoff related water quality contaminants are transported from land,
particularly the impervious surfaces, during the initial stages of storm events.
3.2.1 NYSDEC Requirements for Water Quality Volume
The Design Manual requires that water quality treatment be provided for the initial flush of runoff from
every storm. The NYSDEC refers to the amount of runoff to be treated as the “Water Quality Volume”
(WQv). Section 4.2 of the Design Manual defines the Water Quality Volume as follows:
WQv = [(P )(R V )(A )]
12
Where: P = 90% Rainfall Event Number
Rv = 0.05 + 0.009 (I)
I = Impervious Cover (Percent)
A = Contributing Area in Acres
This definition ensures that, all other things being equal, the Water Quality Volume will increase along
with the impervious cover percentage.
3.2.2 Methodology for Redevelopment Projects
Chapter 9 of the Design Manual outlines alternative WQv treatment objectives for redevelopment
projects.
According to Section 9.2.1.B.IV, redevelopment activities can achieve the water quality treatment
objective through a combination of impervious cover reduction, standard SMPs, and alternative SMPs
that provide a weighted average of at least two of the above methods, calculated as shown below. In
this case, 100% of any new increase in impervious area to a given design point must be treated by
approved alternate SMPs, standard SMPs, or RR techniques.
%ALT = [25-(% ICRED+ %SMP+ %RR)] x 3
Where:
%ALT = Percent of redevelopment impervious area treated by alternative SMP(s)
Stormwater Pollution Prevention Plan
Page 7
2241067
Page 353 of 1174
Page 354
%ICRED = Percent reduction in existing disturbed impervious area
%SMP = Percent of redevelopment impervious area treated by standard SMP(s)
%RR = Percent of redevelopment impervious area treated by runoff reduction techniques(s)
This redevelopment project is proposing a combination of WQv treatment by standard practice(s) and
alternative practice(s) as shown in the following tables:
Table 4: Required WQv Treatment by Alternative Practice
WQv Treatment by Impervious Cover WQv Treatment by Runoff Reduction
Alternative Practice Reduction (IC) Standard Practice
% Area (ac) % Area (ac) % Area (ac) % Area (ac)
55% 2.28 0 0 45% 1.86 0 0
Table 5: WQv Required Summary
P (inches) A (ac) I (ac) Rv WQv Required
1.00 16.62 3.01 0.29 10,567 cf 0.24 AF
The Water Quality Volume equation has been applied to the drainage area tributary to each of the
stormwater quality practices proposed for this project. The practices have been sized to accommodate
the Water Quality Volume, as per the performance criteria presented in Chapter 6 and/or Chapter 9 of
the Design Manual. Water quality volume calculations for each of the proposed practices are
presented in Appendix C.
3.3 STEP 3 – Apply RR Techniques and Standard SMPs with RRv Capacity to Reduce Total
WQv
Land use change and development in the watershed increases the volume of runoff. As such,
reductions in the amount of runoff from new development, accomplished through the implementation
of a stormwater management plan for the site, will play an important role in the success or failure of
the watershed-wide stormwater management plan. Runoff reduction techniques can be applied to
manage, reduce, and treat stormwater, while maintaining and restoring natural hydrology through
infiltration, evapo-transpiration, and the capture and reuse of stormwater. Volume reduction
techniques by themselves typically are not sufficient to provide adequate attenuation of stormwater
runoff, but they can decrease the size of the peak runoff rate reduction facilities.
3.3.1 NYSDEC Requirements for Redevelopment
Section 9.2.1.B of the Design Manual indicates, “Although encouraged, meeting the RRv criteria is not
required for the redevelopment activity portion of a project. The need to provide RRv shall be
considered separately for each design point. For design points with a net increase in impervious area,
RRv is required for the increase in impervious area only.”
As such, bioretentions and a water quality unit have been applied to the project to meet the WQv
objective for the redevelopment activity of the project. The increase in impervious cover will be treated
as new development and both the WQv criteria and RRv criteria are met.
Stormwater Pollution Prevention Plan
Page 8
2241067
Page 354 of 1174
Page 355
3.3.2
3.3.2 Application of Standard Stormwater Management Practices (SMPs) with RRv Capacity
The following Table demonstrates a summary of the standard SMP(s) with RRv capacity that have been
incorporated into the stormwater management plan for this project. The standard SMP(s) with RRv
capacity have been designed in accordance with Chapter 6 of the Design Manual. Refer to the contract
drawings for practice dimensions, material specifications, and installation details. Practice specific
calculations are presented in Appendix C.
Table 6: Summary of Standard SMPs with RRv Capacity being Applied
WQv
Pretreatment
Standard Pretreatment WQv Reduced WQv Total WQv
Design Volume RRv
SMP with Volume Required /RRv Treated1 Provided2
Variant Required Capacity
RRv Capacity Provided (CF) (CF) Provided (CF) (CF)
(% of WQv)
(CF)
Filtration
F-5 25 875 40% 3,499 1,500 1,999 3,499
Bioretention
Footnotes:
1WQv Treated = WQV Required - RRv Provided
2Total WQv Provided = WQV Treated + RRv Provided
3.3.3 RRv Performance Summary
A summary of the RRv provided is presented in the following table:
Table 7: RRv Summary
RRv Provided % RRv Provided/
WQv Required (CF)
WQv Reduced (CF) WQv Reduced
10,567 1,500 >100%
As indicated in the above table, the RRv provided is greater than the RRv required for the project site.
As such, the RRv criteria has been met and the designer can proceed to Step 6.
3.4 STEP 4 – Calculate the Minimum RRv Required
As indicated above, Section 9.2.1.B of the Design Manual indicates, “Although encouraged, meeting
the RRv criteria is not required for the redevelopment activity portion of a project.”
3.5 STEP 5 – Apply Standard SMPs to Address Remaining Water Quality Volume
If the entire Water Quality Volume is not treated through implementation of RR techniques and
standard SMPs with RRv capacity, then the design must achieve the remaining WQv through the
standard SMPs listed in Table 3.3 of the Design Manual or the Alternative Practices outlined in Section
9.4 of the Design Manual.
Stormwater Pollution Prevention Plan
Page 9
2241067
Page 355 of 1174
Page 356
Table 8: Summary of WQv Provided
Step 5
Step 3
Reduced WQv to be
Step 2 WQv Reduction by
Treated by Standard
WQv Required (CF) Standard SMPs w/ RRv
SMPs or Alternative
Capacity (CF)1
Practices (CF)2
10,567 3,499 7,144
Footnotes:
1Step 3: WQv Reduction = RRv Provided + WQv Treated by Standard SMP with RRv Capacity
2Step 5: Reduced WQv to be Treated = WQv Required – WQv Reduced
Based upon the results listed in the above Table, the entire WQv has not been treated by application
of RR techniques and standard SMPs with RRv capacity. As such, the standard SMPs or the Alternative
Practices (without RRv capacity) described in the following sections, have been incorporated into the
stormwater management plan for this project, to meet the WQv objective. Practice-specific calculations
are presented in Appendix C.
3.5.1 Underground Stormwater Detention System
Underground stormwater detention systems store and detain stormwater runoff in order to meet water
quantity control requirements. Stormwater is stored in subsurface vaults and/or a system of large
diameter interconnected storage pipes. Stored water is then released at rates designed to reduce
peak run-off flows during post-development storms. Underground stormwater storage provides
minimal stormwater quality benefits, but can be an effective component of a development’s overall
stormwater management plan.
3.5.2 Hydrodynamic Separators
Hydrodynamic separators accelerate the separation of floating and settling pollutants from stormwater
through the use of a vortex. These pre-fabricated devices come in the form of an underground manhole
or vault. The devices have no moving parts and are typically fabricated from concrete and marine grade
aluminum.
During operation, stormwater runoff enters the unit tangentially to promote a gentle swirling motion in
a treatment chamber. As stormwater circles within the chamber, settable solids fall into a sump and
are retained. Buoyant debris, oil, and grease rise to the surface and are separated from the water as
it flows under a baffle wall. Finally, treated water exits the treatment chamber through a flow control
orifice located behind the baffle wall.
During low-flow conditions all runoff is diverted into the treatment chamber by a flow partition. At higher
flow rates, a portion of the runoff spills over the flow partition and is diverted around the treatment
chamber to prevent re-suspension and washout of previously trapped pollutants. Water that spills over
the partition flows into a head equalization chamber above the treatment chamber outlet. As the head
equalization chamber fills, the head differential driving flow through the treatment chamber collapses.
The result is that flow rates in the treatment chamber remain relatively constant even as total flow
rates increase substantially. This configuration further reduces the potential for re-suspension or
washout.
Stormwater Pollution Prevention Plan
Page 10
2241067
Page 356 of 1174
Page 357
According to Chapter 9 of the Design Manual, hydrodynamic separators of the type proposed for this
project have been approved for use as a pretreatment system in new and redevelopment projects or
as a primary treatment system on redevelopment projects.
According to Chapter 9 of the Design Manual, membrane filtration, of the type proposed for this project,
has been approved for use as a primary treatment system on redevelopment projects.
The following Table summarizes both the Water Quality Volume requirements and the treatment
volumes provided.
Table 9: Summary of Hydrodynamic Unit(s)
SWM NYSDEC Required WQv Approved Manufactured Product Name
Required
Practice Design Flow Rate Treatment Flow Rate and
WQv (CF)
ID Variant (CFS) (MTFR) (CFS) Manufacturer
ADS Barracuda
HYD-1 ALT 7,144 2.08 3.08
Max S6
3.6 STEP 6 - Apply Volume and Peak Rate Control
This report presents the pre-development and post-development features and conditions associated
with the rate of surface water runoff within the study area. For both cases, the drainage patterns,
drainage structures, soil types, and ground cover types are considered in this study.
3.6.1 NYSDEC Requirements for New Development
Chapter 4 of the Design Manual requires that projects meet three separate stormwater quantity
criteria:
1. The Channel Protection (CPv) requirement is designed to protect stream channels from
erosion. This is accomplished by providing 24 hours of extended detention for the 1-year, 24-
hour storm event. The Manual defines the CPv detention time as the center of mass detention
time through each stormwater management practice.
2. The Overbank Flood Control (Qp) requirement is designed to prevent an increase in the
frequency and magnitude of flow events that exceed the bank-full capacity of a channel, and
therefore must spill over into the floodplain. This is accomplished by providing detention
storage to ensure that, at each Design Point, the post-development 10-year 24-hour peak
discharge rate does not exceed the corresponding pre-development rate.
3. The Extreme Flood Control (Qf) requirement is designed to prevent the increased risk of flood
damage from large storm events, to maintain the boundaries of the pre-development 100-year
floodplain, and to protect the physical integrity of stormwater management practices. This is
accomplished by providing detention storage to ensure that, at each Design Point, the post-
development 100-year 24-hour peak discharge rate does not exceed the corresponding pre-
development rate.
Stormwater Pollution Prevention Plan
Page 11
2241067
Page 357 of 1174
Page 358
3.6.2 Methodology
In order to demonstrate that the NYSDEC detention requirements are being met, the Design Manual
requires that a hydrologic and hydraulic analysis of the pre- and post-development conditions be
performed using the Natural Resources Conservation Service Technical Release 20 (TR-20) and
Technical Release 55 (TR-55) methodologies. HydroCAD, developed by HydroCAD Software Solutions
LLC of Tamworth, New Hampshire, is a Computer-Aided-Design (CAD) program for analyzing the
hydrologic and hydraulic characteristics of a given watershed and associated stormwater management
facilities. HydroCAD uses the TR-20 algorithms and TR-55 methods to create and route runoff
hydrographs.
HydroCAD has the capability of computing hydrographs (which represent discharge rates characteristic
of specified watershed conditions, precipitation, and geologic factors) combining hydrographs and
routing flows though pipes, streams and ponds. HydroCAD can also calculate the center of mass
detention time for various hydraulic features. Documentation for HydroCAD can be found on their
website: http://www.hydrocad.net/.
For this analysis, the watershed and drainage system was broken down into a network consisting of
three types of components as described below:
1. Subcatchment: A relatively homogeneous area of land, which produces a volume and rate of
runoff unique to that area.
2. Reach: Uniform streams, channels, or pipes that convey stormwater from one point to another.
3. Pond: Natural or man-made impoundment, which temporarily stores stormwater runoff and
empties in a manner determined by its geometry and the hydraulic structure located at its
outlets.
Subcatchments, reaches, and ponds are represented by hexagons, squares, and triangles,
respectively, on the watershed routing diagrams provided with the computations included in Appendix
D and Appendix E.
The analysis of hydrologic and hydraulic conditions and proposed stormwater management facilities,
servicing the study area, was performed by dividing the tributary watershed into relatively
homogeneous subcatchments. The separation of the watershed into subcatchments was dictated by
watershed conditions, methods of collection, conveyance, and points of discharge. Watershed
characteristics for each subcatchment were then assessed from United States Geological Service
(USGS) 7.5-minute topographic maps, aerial photographs, a topographical survey, soil surveys, site
investigations, and land use maps.
Proposed stormwater management practices were designed and evaluated in accordance with the
Design Manual and local regulatory requirements. A local IDF file was imported, and specific mass
curves were generated, in HydroCAD to evaluate the pre- and post-development stormwater runoff
characteristics for various 24-hour storm events identified in the following Table.
Stormwater Pollution Prevention Plan
Page 12
2241067
Page 358 of 1174
Page 359
Table 10: Design Events
Facility 24-hour Storm Event
Storm Sewer 10-year
1-year
Stormwater Management Practice(s) 10-year
100-year
Flood Conditions 100-year
3.6.3 Performance Summary
A comparison of the total required and provided CPv for the 1-year 24-hour storm event is shown in
the following table:
Table 11: CPv Summary
Design Point Required CPv Provided CPv
(DP) (af) (af)
1 0.20 0.36
A comparison of the pre- and post-development watershed conditions was performed for all Design
Points and storm events evaluated herein. For all Design Points and design storms, this comparison
demonstrates that the peak rate of runoff will not be increased. Therefore, the project will not have a
significant adverse impact on the adjacent or downstream properties or receiving water courses.
The results of the computer modeling used to analyze the pre- and post-development watersheds are
presented in Appendix D and Appendix E, respectively. The following Table summarizes the results of
this analysis.
Table 12: Summary of Pre- and Post-Development Peak Discharge Rates
Pre- vs. Post-Development Discharge Rate (cfs)
Design 1-year 24-hour 10-year 24-hour 25-year 24-hour 100-year 24-hour storm
Point storm event storm event storm event event
(DP) Pre Post Pre Post Pre Post Pre Post
1 5.58 2.94 17.02 9.76 NA 16.38 39.07 31.21
3.7 Climate Change Consideration
This report presents the consideration for future physical risks due to climate change, in accordance
with Part III.A.2 of the permit. Overall site planning, control measures and practices, conveyance
systems and detention systems were evaluated against the seven (7) physical risks identified by
NYSDEC due to climate change pursuant to the Community Risk and Resiliency Act (CRRA), 6 NYCRR
490, and associated guidance. Appendix C provides a description of each consideration, specific to
the project.
Stormwater Pollution Prevention Plan
Page 13
2241067
Page 359 of 1174
Page 360
4.0 CONSTRUCTION SEQUENCE
This project has not received written approval from the Town of West Seneca allowing the disturbance
of more than five acres of land at any one time. Therefore, if the Contractor’s construction sequence
requires the disturbance of more than five acres at any one time, written approval must be obtained
from written approval from the Town of West Seneca prior to disturbing more than five acres at once.
The “Erosion and Sediment Control Plan” and the “Erosion and Sediment Control Plan Prior to
Construction” in the accompanying drawings and waiver request identifies the major construction
activities that are the subject of this SWPPP. The order (or sequence) in which the major activities are
expected to begin is presented on the accompanying drawings, though each activity will not necessarily
be completed before the next begins. In addition, these activities could occur in a different order if
necessary to maintain adequate erosion and sediment control. If this is the case, the contractor shall
notify the Owner’s/Operator’s Engineer overseeing the implementation of the SWPPP.
The Contractor will be responsible for implementing the erosion and sediment control measures
identified on the plans. The Contractor may designate these tasks to certain subcontractors as they
see fit, but the ultimate responsibility for implementing these controls and ensuring their proper
function remains with the Contractor.
In accordance with Part III.B.c.iv. a phasing plan for the project and sequencing plans for all phases
have been provided. The plans address clearing and grubbing, excavation and grading, utility and
infrastructure installation, final stabilization, and any other construction activity at the site that will
result in soil disturbance. Refer to the plans for further information on the project phasing and
sequencing.
5.0 CONSTRUCTION-PHASE POLLUTION CONTROL
The SWPPP and accompanying plans identify the temporary and permanent erosion and sediment
control measures that have been incorporated into the design of this project. These measures will be
implemented during construction, to minimize soil erosion and control sediment transport off-site, and
after construction, to control the quality and quantity of stormwater runoff from the developed site.
Erosion control measures, designed to minimize soil loss, and sediment control measures, intended
to retain eroded soil and prevent it from reaching water bodies or adjoining properties, have been
developed in accordance with the following documents:
• NYSDEC SPDES General Permit for Stormwater Discharges From Construction Activity, Permit
No. GP-0-25-001 (effective January 29, 2025 through January 28, 2030)
• New York State Standards and Specifications for Erosion and Sediment Control, NYSDEC
(November 2016)
The SWPPP and accompanying plans outline the construction scheduling for implementing the erosion
and sediment control measures. These documents include limitations on the duration of soil exposure,
criteria and specifications for placement and installation of the erosion and sediment control
measures, a maintenance schedule, and specifications for the implementation of erosion and
sediment control practices and procedures.
Temporary and permanent erosion and sediment control measures that shall be applied during
construction generally include:
Stormwater Pollution Prevention Plan
Page 14
2241067
Page 360 of 1174
Page 361
1. Minimizing soil erosion and sedimentation by stabilization of disturbed areas and by removing
sediment from construction site discharges.
2. Preservation of existing vegetation to the greatest extent practical. Following the completion
of construction activities in any portion of the site, permanent vegetation shall be established
on all exposed soils.
3. Site preparation activities to minimize the area and duration of soil disruption.
4. Establishment of permanent traffic corridors to ensure that “routes of convenience” are
avoided.
5.1 Temporary Erosion and Sediment Control Measures
The temporary erosion and sediment control measures described in the following sections are
included as part of the construction documents.
5.1.1 Stabilized Construction Access
Prior to construction, stabilized construction access(es) will be installed, per accompanying plans, to
reduce the tracking of sediment onto public roadways.
Construction traffic must enter and exit the site at the stabilized construction access(es). The intent is
to trap dust and mud that would otherwise be carried off-site by construction traffic.
The access(es) shall be maintained in a condition, which will control tracking of sediment onto public
rights-of-way or streets. When necessary, additional aggregate will be placed atop the filter fabric to
assure the minimum thickness is maintained. All sediment and/or soil spilled, dropped, or washed
onto public rights-of-way must be removed immediately. Periodic inspection and needed maintenance
shall be provided after each substantial rainfall event.
5.1.2 Dust Control
Water trucks shall be used as needed during construction to reduce dust generated on-site. Dust
control must be provided by the Contractor(s) to a degree that is acceptable to the Owner, and in
compliance with the applicable local and state dust control requirements.
5.1.3 Temporary Soil Stockpile
Materials, such as topsoil, will be temporarily stockpiled (if necessary) on the site during the
construction process. Stockpiles shall be located in an area away from storm drainage, water bodies
and/or courses, and will be properly protected from erosion by a surrounding silt fence barrier.
5.1.4 Silt Fencing
Prior to the initiation of and during construction activities, a geotextile filter fabric (or silt fence) will be
established downgradient of all disturbed areas. These barriers may extend into non-impact areas to
provide adequate protection of adjacent lands.
Clearing and grubbing will be performed only as necessary for the installation of the sediment control
barrier. To facilitate effectiveness of the silt fencing, daily inspections and inspections immediately
after significant storm events will be performed by the Contractor(s). Maintenance of the fence will be
performed as needed.
Stormwater Pollution Prevention Plan
Page 15
2241067
Page 361 of 1174
Page 362
5.1.5 Temporary Seeding
For areas undergoing clearing, grading, and disturbance as part of construction activities, where work
has temporarily ceased, temporary soil stabilization measures must be initiated by the end of the next
business day and completed within fourteen (14) days from the date the soil disturbance activity has
temporarily ceased.
5.1.6 Manufactured Insert Inlet Protection
Install insert inlet protection beneath the grate of all catch basins, to prevent sediment from entering
the catch basins and storm sewer system. Remove sediment accumulation and repair or replace insert
as necessary to ensure proper function.
5.1.7 Filter Fabric Drop Inlet Protection
Install filter fabric or silt fence with wooden stakes at the perimeter of existing or proposed catch basins
located in lawn areas, to prevent sediment from entering the catch basins and storm sewer system.
Remove sediment accumulation and repair or replace fabric as necessary to ensure proper function.
5.1.8 Erosion Control Blanket
Erosion control blankets shall be installed in accordance with manufacturer’s requirements on all
slopes exceeding 3:1. Erosion control blankets provide temporary erosion protection, rapid vegetative
establishment, and long-term erosion resistance to shear stresses generated by high runoff flow
velocities associated with steep slopes.
5.1.9 Stone Check Dams
Stone check dams will be installed within drainage ditches to reduce the velocity of stormwater runoff,
promote settling of sediment, and reduce sediment transport off-site.
Sediment accumulated behind the stone check dam will be removed as needed to maintain flow
through the stone check dam and prevent large flows from carrying sediment over or around the dam.
Stones shall be replaced as needed to maintain the design cross section of the structures.
5.1.10 Temporary Sediment Trap
Temporary sediment traps shall be constructed to intercept sediment-laden runoff, reduce the amount
of sediment leaving the disturbed areas, and protect drainage ways, properties, and rights-of-way.
Accumulated sediment shall be removed from the trap when it reaches no greater than 50 percent of
the design capacity. Sediment shall not be placed downstream from the embankment, adjacent to a
stream, or floodplain.
Temporary sediment traps depicted on the accompanying plans have been designed to provide 3,600
CF of storage per acre of tributary watershed.
5.1.11 Temporary Diversion Swales
Temporary diversion swales shall be used to divert off-site runoff around the construction site and
divert runoff from stabilized areas around disturbed areas.
5.1.12 Dewatering Operations
Dewatering will be used to intercept sediment-laden stormwater or pumped groundwater and allow it
to settle out of the pumped discharge prior to being discharged from the site. Water from dewatering
Stormwater Pollution Prevention Plan
Page 16
2241067
Page 362 of 1174
Page 363
operations shall be treated to eliminate the discharge of sediment and other pollutants. Water
resulting from dewatering operations shall be directed to temporary sediment traps or dewatering
devices. Temporary sediment traps and dewatering bags will be provided, installed, and maintained
at downgradient locations to control sediment deposits to downstream surfaces.
5.1.13 Fiber Roll
Prior to the initiation of and during construction activities, fiber rolls (12” minimum diameter) will be
established downgradient of all disturbed areas to reduce sheet flow on slopes. These rolls may extend
into non-impact areas to provide adequate protection of adjacent lands. Spacing will conform to
NYSDEC specification for straw bale dike.
Clearing and grubbing will be performed only as necessary for the installation of the fiber rolls. To
facilitate effectiveness, daily inspections and inspections immediately after significant storm events
will be performed by the Contractor(s) and maintenance will be performed as needed.
5.2 Permanent Erosion and Sediment Control Measures
The permanent erosion and sediment control measures described in the following sections are
included as part of the construction documents.
5.2.1 Establishment of Permanent Vegetation
Disturbed areas that will be vegetated must be seeded in accordance with the contract documents.
The type of seed, mulch, and maintenance measures as described in the contract documents shall
also be followed.
Permanent soil stabilization measures must be initiated by the end of the next business day and
completed within fourteen (14) days from the date the soil disturbance activity has permanently
ceased.
Final site stabilization is achieved when all soil-disturbing activities at the site have been completed
and a uniform, perennial vegetative cover with a density of 80 percent has been established or
equivalent stabilization measures (such as the use of mulches or geotextiles) have been employed on
all unpaved areas and areas not covered by permanent structures.
5.2.2 Rock Outlet Protection
Rock outlet protection shall be installed at the locations as indicated and detailed on the
accompanying plans. The installation of rock outlet protection will reduce the velocity and energy of
water, such that the flow will not erode downstream surfaces.
5.3 Implementation Schedule for Erosion and Sediment Control Measures
Proper implementation of the outlined erosion and sediment control measures is critical to minimizing
soil erosion and controlling off-site sediment transport during construction, as well as controlling the
quality and quantity of stormwater runoff from the developed site after construction. The following
table outlines the implementation schedule for initial placement of these measures, and the duration
for which they should remain in place.
Stormwater Pollution Prevention Plan
Page 17
2241067
Page 363 of 1174
Page 364
Table 13: Implementation Schedule for Erosion and Sediment Control Measures
Erosion and Sediment
Initial Placement Duration to Remain In-Place
Control Measure
Stabilized Construction Access Upon mobilizing to site Until construction is complete
Dust Control As needed As needed
Upon delivery of materials to the
Until materials have been placed
Temporary Soil Stockpile site or excavation of on-site
or removed from the site
materials for reuse
Prior to upgradient soil Until upgradient area has achieved
Silt Fencing
disturbance permanent stabilization
Apply to any disturbed soil that will
Apply additional seed as needed
Temporary Seeding remain exposed for more than 14
for temporary stabilization
days
Existing structures: prior to
Manufactured Insert Inlet upgradient soil disturbance Until upgradient area has achieved
Protection New structures: upon installation permanent stabilization
of structure/grate
Upon completion of slope grading Prior to final grading, or kept in
Erosion Control Blanket
operations place permanently
Existing swales: upon completion
of swale reshaping
Stone Check Dams Permanent
New swales: upon completion of
swale excavation
As needed during grading Until final grading of tributary area
Temporary Sediment Trap
operations is complete
Until permanent drainage methods
As needed to divert flow around are established (i.e. closed storm
Temporary Diversion Swales
work area sewer, open conveyance swales,
etc.)
Until excavation/backfilling is
Dewatering Operations As needed during excavation
complete
Prior to upgradient soil Until upgradient area has achieved
Fiber Roll
disturbance permanent stabilization
Permanent, apply additional seed
Establishment of Permanent As soon as possible after
as needed to achieve 80%
Vegetation completion of final grading
minimum uniform coverage
During installation of tributary
Rock Outlet Protection Permanent
culverts/pipes
5.4 Other Pollutant Controls
Part I.C.1 of GP-0-25-001 prohibits discharges from construction material wastewater, pollutants
used in vehicle and equipment operation and maintenance, vehicle and equipment washing and
toxic or hazardous substances.
Stormwater Pollution Prevention Plan
Page 18
2241067
Page 364 of 1174
Page 365
The following table identifies materials and/or chemicals commonly used and/or stored on
construction sites and should be addressed in the site-specific spill prevention and response plan:
Stormwater Pollution Prevention Plan
Page 19
2241067
Page 365 of 1174
Page 366
Table 14: Common Construction Pollutants
Material/Chemical Physical Description Stormwater Pollutants Location*
Pesticides Various colored to Chlorinated Herbicides used for
(insecticides, colorless liquid, hydrocarbons, noxious weed control
fungicides, powder, pellets, or organophosphates,
herbicides, grains carbamates, arsenic
rodenticides)
Fertilizer Liquid or solid grains Nitrogen, phosphorous Newly seeded areas
Cleaning solvents Colorless, blue, or Perchloroethylene, No equipment cleaning
yellow-green liquid methylene chloride, allowed in project limits
trichloroethylene,
petroleum distillates
Asphalt Black solid Oil, petroleum distillates Streets and roofing
Concrete White solid/grey liquid Limestone, sand, pH, Curb and gutter, building
chromium construction
Curing compounds Creamy white liquid Naphtha Curb and gutter
Hydraulic oil/fluids Brown oily petroleum Mineral oil Leaks or broken hoses
hydrocarbon from equipment
Gasoline Colorless, pale brown Benzene, ethyl benzene, Secondary containment /
or pink petroleum toluene, xylene, MTBE staging area
hydrocarbon
Diesel Fuel Clear, blue-green to Petroleum distillate, oil & Secondary containment /
yellow liquid grease, naphthalene, staging area
xylenes
Kerosene Pale yellow liquid Coal oil, petroleum Secondary containment /
petroleum distillates staging area
hydrocarbon
Antifreeze/coolant Clear green/yellow Ethylene glycol, propylene Leaks or broken hoses
liquid glycol, heavy metals from equipment
(copper, lead, zinc)
Sanitary toilets Various colored liquid Bacteria, parasites, and Staging area
viruses
Construction
materials
Granular fill Various colored solids Sediment Stockpile / fill areas
Subbase course Gray/brown solid Sediment, dust Stockpile
Topsoil Brown solid Sediment Stockpile
Mulch Various colored solid Sediment, debris Staging area
Seed Brown/yellow solid Nutrients, debris Staging area
HDPE Storm Pipe Black solid Staging area
SDR-35, SDR-21 Various colored solid Staging area
PVC Pipe
Metals Frames and Gray solid Staging area
Grates
Joint Sealant Light gray viscous Polyurethane Staging area
solid
*(Area where material/chemical is used on-site)
Stormwater Pollution Prevention Plan
Page 20
2241067
Page 366 of 1174
Page 367
5.5 Construction Housekeeping Practices
During the construction phase, the Contractor(s) will implement the following measures:
5.5.1 Sediment Sweeping/Vacuuming
Any sediment that is tracked by construction vehicles or erosion onto adjacent public or private
impervious surfaces must be swept or vacuumed, utilizing self-propelled and/or walk-behind
equipment, and removed on a daily basis. Kick brooms and sweeper attachments are not an
acceptable means of sweeping. Sweeping or vacuuming should not take place while tracked sediment
is wet. If tracked sediment is compacted, the sediment must be scraped loose prior to sweeping or
vacuuming.
5.5.2 Material Stockpiles
Material resulting from clearing and grubbing operations that will be stockpiled on-site, must be
adequately protected with downgradient erosion and sediment controls.
5.5.3 Equipment Cleaning and Maintenance
The Contractor(s) will designate areas for equipment cleaning, maintenance, and repair. The
Contractor(s) and subcontractor(s) will utilize those areas. The areas will be protected by a temporary
perimeter berm.
5.5.4 Detergents
The use of detergents for large-scale washing is prohibited (i.e., vehicles, buildings, pavement
surfaces, etc.)
5.5.5 Spill Prevention and Response
A Spill Prevention and Response Plan shall be developed, for the pollutants identified in Section 5.3,
for the site by the Contractor(s) that addresses the following:
1. Reducing chance of spills
2. Stopping the source of spills
3. Containing and cleaning up spills
4. Disposing of materials contaminated by spills
5. Training personnel responsible for spill prevention/response
6. Material handling procedures
7. Material storage requirements
The plan shall detail the steps required in the event of an accidental spill and shall identify contact
names and phone numbers of people and agencies that must be notified.
The plan shall include Safety Data Sheets (SDS) for all materials to be stored on-site. All workers on-
site will be required to be trained on safe handling and spill prevention procedures for all materials
used during construction. Regular tailgate safety meetings shall be held and all workers that are
expected on the site during the week shall be required to attend.
5.5.6 Concrete Washout Areas
A temporary concrete washout area shall be provided for every project where concrete will be poured
or otherwise formed on-site and shall consist of an excavated or above-ground lined construction pit
Stormwater Pollution Prevention Plan
Page 21
2241067
Page 367 of 1174
Page 368
where concrete trucks or equipment can be washed out after their loads have been discharged. Waste
generated from concrete wash water that shall not be allowed to flow into drainage ways, inlets,
receiving waters, highway right-of-way, or any location other than the designated concrete washout
area(s). Proper signage shall be placed adjacent to the facility to designate the “Concrete Washout
Area”. Locate the facility a minimum of 100-feet from drainage swales, storm drain inlets, wetlands,
streams, and other surface waters. Prevent surface water from entering the washout area.
The hardened residue from the concrete wash areas will be disposed of in the same manner as other
non-hazardous construction waste materials. Maintenance of the washout area shall include removal
of hardened material when 75% of the storage capacity is filled, and a minimum freeboard of 12
inches shall be maintained. The Contractor will be responsible for seeing that these procedures are
followed. The project may require the use of multiple concrete washout areas based on the frequency
of concrete pours.
5.5.7 Material Storage
Construction materials shall be stored in a dedicated staging area. The staging area shall be located
in an area that prevents negative impacts of construction materials on stormwater quality.
Chemicals, paints, solvents, fertilizers, and other toxic material must be stored in waterproof
containers. Except during application, the contents must be kept in trucks or within storage facilities.
Runoff containing such material must be collected, removed from the site, treated, and disposed of at
an approved solid waste or chemical disposal facility.
6.0 INSPECTIONS, MAINTENANCE, AND REPORTING
6.1 Inspection and Maintenance Requirements
6.1.1 Pre-Construction Inspection and Certification
Prior to the commencement of construction, the Qualified Inspector/Qualified Professional shall
conduct an assessment of the site and certify that the appropriate erosion and sediment control
measures have been adequately installed and implemented. The Contractor shall contact the Qualified
Inspector/Qualified Professional once the erosion and sediment control measures have been
installed.
6.1.2 Construction Phase Inspections and Maintenance
A Qualified Inspector/Qualified Professional, as defined in Appendix A of the General Permit GP-0-25-
001, shall conduct regular site inspections between the time this SWPPP is implemented and final site
stabilization. Site inspections shall occur at an interval of at least once every seven (7) calendar days.
The purpose of site inspections is to assess performance of pollutant controls. Based on these
inspections, the Qualified Inspector/Qualified Professional will decide whether it is necessary to modify
this SWPPP, add or relocate sediment barriers, or whatever else may be needed in order to prevent
pollutants from leaving the site via stormwater runoff. The general contractor has the duty to cause
pollutant control measures to be repaired, modified, maintained, supplemented, or whatever else is
necessary in order to achieve effective pollutant control.
Examples of particular items to evaluate during site inspections are listed below. This list is not
intended to be comprehensive. During each inspection the inspector must evaluate overall pollutant
Stormwater Pollution Prevention Plan
Page 22
2241067
Page 368 of 1174
Page 369
control system performance as well as particular details of individual system components. Additional
factors should be considered as appropriate to the circumstances.
1. Locations where vehicles enter and exit the site must be inspected for evidence of off-site
sediment tracking. A stabilized construction access will be constructed where vehicles enter
and exit. This access will be maintained or supplemented as necessary to prevent sediment
from leaving the site on vehicles.
2. Sediment barriers must be inspected and, if necessary, they must be enlarged or cleaned in
order to provide additional capacity. All material from behind sediment barriers will be
stockpiled on the up slope side. Additional sediment barriers must be constructed as needed.
3. Inspections will evaluate disturbed areas and areas used for storing materials that are exposed
to rainfall for evidence of, or the potential for, pollutants entering the drainage system. If
necessary, the materials must be covered or original covers must be repaired or
supplemented. Also, protective berms must be constructed, if needed, in order to contain
runoff from material storage areas.
4. Grassed areas will be inspected to confirm that a healthy stand of grass is maintained. The
site has achieved final stabilization once all areas are covered with building foundation or
pavement, or have a stand of grass with at least 80 percent density. The density of 80 percent
or greater must be maintained to be considered as stabilized. Areas must be watered,
fertilized, and reseeded as needed to achieve this goal.
5. All discharge points must be inspected to determine whether erosion control measures are
effective in preventing significant impacts to receiving waters.
The inspection reports must be completed entirely and additional remarks should be included if
needed to fully describe a situation. An important aspect of the inspection report is the description of
additional measures that need to be taken to enhance plan effectiveness. The inspection report must
identify whether the site was in compliance with the SWPPP at the time of inspection and specifically
identify all incidents of non-compliance.
Within one (1) business day of the completion of an inspection, the Qualified Inspector/Qualified
Professional shall notify the Owner/Operator and appropriate contractor or subcontractor of any
corrective actions that need to be taken. For corrective actions not requiring engineering design, the
contractor must begin implementing corrective actions within one business day and complete the
corrective actions within five business days. For corrective actions requiring engineering design, the
engineering design process must begin within five business days and the contractor must complete
the corrective action in a reasonable time frame but no later than 60 calendar days.
In addition to the inspections performed by the Qualified Inspector/Qualified Professional, the
Contractor shall perform routine inspections that include a visual check of all erosion and sediment
control measures. All inspections and maintenance shall be performed in accordance with the
inspection and maintenance schedule provided on the accompanying plans. Sediment removed from
erosion and sediment control measures will be exported from the site, stockpiled for later use, or used
immediately for general non-structural fill.
It is the responsibility of the general contractor to assure the adequacy of site pollutant discharge
controls. Actual physical site conditions or contractor practices could make it necessary to install more
structural controls than are shown on the accompanying plans. (For example, localized concentrations
of runoff could make it necessary to install additional sediment barriers, sediment traps, etc.)
Assessing the need for additional controls and implementing them or adjusting existing controls will
be a continuing aspect of this SWPPP until the site achieves final stabilization.
Stormwater Pollution Prevention Plan
Page 23
2241067
Page 369 of 1174
Page 370
6.1.3 Temporary Suspension of Construction Activities
For construction sites where soil disturbance activities have been temporarily suspended (e.g. Winter
shutdown) and temporary stabilization measures have been applied to all disturbed areas, the
frequency of Qualified Inspector/Qualified Professional inspections can be reduced to once every 30
calendar days. Prior to reducing the frequency of inspections, the Owner/Operator shall notify the
NYSDEC Region 9 stormwater contact person and the Town of West Seneca in writing.
6.1.4 Partial Project Completion
For construction sites where soil disturbance activities have been shut down with partial project
completion, all areas disturbed as of the project shutdown date have achieved final stabilization, and
all post-construction stormwater management practices required for the completed portion of the
project have been constructed in conformance with the SWPPP and are operational, the inspections
by the Qualified Inspector/Qualified Professional can stop. Prior to the shutdown, the Owner/Operator
shall notify the NYSDEC Region 9 stormwater contact person and the Town of West Seneca in writing.
If soil disturbance activities have not resumed within two years from the date of shutdown, a Notice of
Termination (NOT) shall be properly completed and submitted to the NYSDEC.
6.1.5 Post-Construction Inspections and Maintenance
Inspections and maintenance of final stabilization measures and post-construction stormwater
management practices shall be performed in accordance with Appendix G, once all disturbed areas
are stabilized and all stormwater management systems are in place and operable.
6.2 Reporting Requirements
6.2.1 Inspection Reports
Pursuant to Part IV.C of GP-0-25-001, inspection reports shall be prepared for the duration of
construction, as outlined herein, and shall be signed by the Qualified Inspector or Qualified
Professional. A sample inspection form is provided in Appendix F.
At a minimum, each inspection report shall record the following information:
1. Permit identification number; and
2. Date and time of inspection; and
3. Name and title of person(s) performing inspection; and
4. A description of the weather and soil conditions (e.g. dry, wet, saturated) at the time of the
inspection, including the temperature at the time of the inspection; and
5. A description of the condition of the runoff at all points of discharge from the construction site.
This must include identification of any discharges of sediment from the construction site.
Include discharges from conveyance systems (i.e. pipes, culverts, ditches, etc.) and overland
flow; and
6. A description of the condition of all surface waters of the State located within, or immediately
adjacent to, the property boundaries of the construction site which receive runoff from
disturbed areas. This must include identification of any discharges of sediment to the surface
waters of the State; and
Stormwater Pollution Prevention Plan
Page 24
2241067
Page 370 of 1174
Page 371
7. Identification of all erosion and sediment control practices and pollution prevention measures
that need repair or maintenance; and
8. Identification of all erosion and sediment control practices and pollution prevention measures
that were not installed properly or are not functioning as designed and need to be reinstalled
or replaced; and
9. Description and sketch (map) of areas with active soil disturbance activity, areas that have
been disturbed but are inactive at the time of the inspection, and areas that have been
stabilized (temporary and/or final) since the last inspection; and
10. Estimates, in square feet or acres, of the following areas:
a. Total area with active soil disturbance (not requiring either temporary stabilization or
final stabilization); and
b. Total area with inactive soil disturbance (requiring either temporary stabilization or
final stabilization); and
c. Total area that has achieved temporary stabilization; and
d. Total area that has achieved final stabilization; and
11. Current stage of construction of all SMPs and identification of all construction activity on site
that is not in conformance with the SWPPP and technical standards; and
12. Corrective action(s) that must be taken to install, repair, replace or maintain erosion and
sediment control practices and pollution prevention measures; and to correct deficiencies
identified with the construction of the SMP(s); and
13. Identification and status of all corrective actions that were required by previous inspection;
and
14. Digital photographs, with date stamp, that clearly show the condition of all practices that have
been identified as needing corrective actions. The qualified inspector must attach color copies
of the digital photographs to the inspection report being maintained onsite within seven (7)
calendar days of the date of the inspection. The qualified inspector must also take digital
photographs, with date stamp, that clearly show the condition of the practice(s) after the
corrective action has been completed. The qualified inspector must attach paper color copies
of the digital photographs to the inspection report that documents the completion of the
corrective action work within seven (7) calendar days of that inspection.
6.2.2 Site Log Book
Pursuant to Part I.E.3 of GP-0-25-001, the Owner/Operator shall retain a copy of the General Permit,
NOI, NOI Acknowledgment Letter, MS4 SWPPP Acceptance Form (if applicable), inspection reports,
contractor and subcontractor certification forms, and all documentation necessary to demonstrate
eligibility under the permit, at the construction site from commencement of construction activity until
the date that all areas of disturbance have achieved final stabilization and the Notice of Termination
has been submitted to the NYSDEC.
The Site Log Book shall be maintained on-site in a secure location (i.e. job trailer, on-site construction
office, or mailbox with lock) and must be accessible during normal business hours to an individual
performing a compliance inspection.
Stormwater Pollution Prevention Plan
Page 25
2241067
Page 371 of 1174
Page 372
6.2.3 Post Construction Records and Archiving
Following construction, the Owner/Operator shall retain copies of the SWPPP, the complete
construction Site Log Book, and records of all data used to complete the NOI to be covered by this
permit, for a period of at least five years from the date that the site is finally stabilized. This period may
be extended by the NYSDEC, at its sole discretion, at any time upon written notification.
Records shall be maintained of all post construction inspections and maintenance work performed in
accordance with the requirements outlined in Appendix G.
7.0 SWPPP IMPLEMENTATION RESPONSIBILITIES
A summary of the responsibilities and obligations of all parties involved with compliance with the
NYSDEC SPDES General Permit GP-0-25-001 conditions is outlined in the subsequent sections. For a
complete listing of the definitions, responsibilities, and obligations, refer to the SPDES General Permit
GP-0-25-001 presented in Appendix J.
7.1 Owner’s/Operator's Responsibilities
1. Ensure that control measures are selected, designed, installed, implemented and maintained
to minimize the discharge of pollutants and prevent a violation of the water quality standards,
meeting the non-numeric effluent limitations in Part II.B.1.(a)-(e) of the SPDES General Permit
and in accordance with the New York State Standards and Specifications for Erosion and
Sediment Control, dated November 2016.
2. Ensure that practices are selected, designed, installed, and maintained to meet the
performance criteria in the Design Manual. Practices must be designed to meet the applicable
sizing criteria in Part II.C.2.a., b., c. or d. of GP-0-25-001.
3. Retain the services of a “Qualified Inspector” or “Qualified Professional” as defined under GP-
0-25-001, to provide the services outlined in Section 7.5 “Qualified Inspector’s/Qualified
Professional’s Responsibilities.”
4. Retain the services of a “Qualified Professional,” as defined under GP-0-25-001, to provide
the services outlined in Section 2.3 “Owner’s/Operator’s Engineers Responsibilities.”
5. Have an authorized corporate officer sign the Owner/Operator Certification Form to
accompany the eNOI. A copy of the completed NOI is included in Appendix B.
6. Submit the electronic version of the NOI (eNOI) along with the MS4 SWPPP acceptance form
using the NYSDEC’s website (http://www.dec.ny.gov/chemical/43133.html).
7. Pay the required initial and annual fees upon receipt of invoices from NYSDEC. These invoices
are generally issued in the fall of each year. The initial fee is calculated as $110.00 per acre
disturbed plus $675.00 per acre of net increase in impervious cover, and the annual fee is
$110.00.
8. Prior to the commencement of construction activity, identify the contractor(s) and
subcontractor(s) that will be responsible for installing, constructing, repairing, replacing,
inspecting, and maintaining the erosion control practices included in the SWPPP and the
Stormwater Pollution Prevention Plan
Page 26
2241067
Page 372 of 1174
Page 373
contractor(s) and subcontractor(s) that will be responsible for constructing the SMPs included
in the SWPPP. Each of the contractors and subcontractors must identify at least one person
from their company to be the trained contractor that will be responsible for implementation of
the SWPPP. Ensure that at least one trained contractor is on site daily when soil disturbance
activities are being performed.
9. Schedule a pre-construction meeting which shall include the Town of West Seneca
representative, Owner’s/Operator’s Engineer, Qualified Inspector, Contractor, and their sub-
contractors to discuss responsibilities as they relate to the implementation of this SWPPP.
10. Retain the services of an independent certified materials testing and inspection firm operating
under the direction of a licensed Professional Engineer to perform regular tests, inspections,
and certifications of the construction materials used in the construction of all post-construction
stormwater management practices.
11. Retain the services of a NYS licensed land surveyor to perform an as-built topographic survey
of the completed post-construction stormwater management facilities.
12. Require the Contractor to fully implement the SWPPP prepared for the site by the
Owner/Operator’s Engineer to ensure that the provisions of the SWPPP are implemented from
the commencement of construction activity until all areas of disturbance have achieved final
stabilization and the Notice of Termination (NOT) has been submitted to the NYSDEC.
13. The Owner/Operator is authorized to commence construction activity as of the authorization
date indicated in the Letter of Authorization (LOA), which is sent by NYSDEC after a complete
eNOI is submitted.
14. Within five (5) business days of receipt of the LOA, send an electronic copy of the LOA to the
MS4 operator(s) with review authority.
15. Forward a copy of the LOA received from DEC to the Owner’s/Operator’s Engineer for project
records, and to the Contractor for display at the construction site.
16. As of the date the LOA is received, the Owner/Operator must make the eNOI, SWPPP and LOA
available for review and copying in accordance with the requirements in Part VII.H. of GP-0-25-
001. When applicable, as of the date an updated LOA is received, the Owner/Operator must
make the updated LOA available for review and copying in accordance with the requirements
in Part VII.H.
17. The Owner/Operator must ensure compliance with all requirements of GP-0-25-001 and that
the provisions of the SWPPP, including any changes made to the SWPPP in accordance with
Part III.A.5., are properly implemented and maintained from the commencement of
construction activity until all area of disturbance have achieved final stabilization; and the
Owner/Operator’s coverage under the permit is terminated in accordance with Part V.A.5.a.
18. As of the date of the commencement of construction activities until Part I.E.2.a. and b. have
been met, the Owner/Operator must maintain at the construction site, a copy of all
documentation necessary to demonstrate eligibility with GP-0-25-001, a copy of GP-0-25-001,
the SWPPP, the signed SWPPP Preparer Certification Form, the signed MS4 SWPPP
Acceptance Form, signed Owner/Operator Certification Form, eNOI, and LOA, and LOA
transmittal to the MS4 Operator in accordance with Part I.D.3.c.
Stormwater Pollution Prevention Plan
Page 27
2241067
Page 373 of 1174
Page 374
19. The Owner/Operator must maintain at the construction site, until Part I.E.2.a and b. have been
met, as of the date the documents become final or are received, a copy of the responsible
contractor’s or subcontractor's certification statement(s) in accordance with Part III.A.7, and
inspection reports in accordance with Part IV.C.4. and 6.
20. The Owner/Operator must maintain the documents in a secure location, such as a job trailer,
on-site construction office, or mailbox with lock. The secure location must be accessible during
normal business hours to an individual performing a compliance inspection. The documents
must be paper documents unless electronic documents are accessible to the inspector during
an inspection to the same extent as a paper copy stored at the site would be. If electronic
documents are kept on site, the Owner/Operator must maintain functional equipment on site
available to an inspector during normal hours of operation such that an inspector may view
the electronic documents in a format that can be read in a similar manner as a paper record
and in a legally dependable format with no less evidentiary value than their paper equivalent.
21. Upon finding a significant non-compliance with the practices described in the SWPPP or
violation of GP-0-25-001, NYSDEC may order an immediate stop to all construction activity at
the site until the non-compliance is remedied. The stop work order must be in writing, describe
the non-compliance in detail, and be sent to the Owner/Operator. Forward a copy of any stop
work order received immediately to the Owner’s/Operator’s Engineer and to the Contractor.
22. If any human remains or archaeological remains are encountered during excavation, the
Owner/Operator must immediately cease, or cause to cease, all construction activity in the
area of the remains and notify the appropriate Regional Water Engineer (RWE). Construction
activity shall not resume until written permission to do so has been received from the RWE.
23. To be authorized to implement modifications to the information previously submitted in the
eNOI, the Owner/Operator must notify NYSDEC via email at [email protected]
requesting access to update the eNOI, update the eNOI to reflect the modifications and
resubmit the eNOI in accordance with Part I.D., and receive an updated LOA.
24. The eNOI, SWPPP, LOA, updated LOAs, and inspection reports required by GP-0-25-001 are
public documents that the Owner/Operator must make available for review and copying by any
person within five (5) business days of the Owner/Operator receiving a written request by any
such person to review these documents. Copying of documents will be done at the requester’s
expense.
25. The Owner/Operator must terminate coverage when the project reaches total project
completion, has a planned shutdown with partial project completion, is changing
Owner/Operator or has obtained coverage under an alternative general SPDES permit or an
individual SPDES permit.
26. Have a qualified inspector perform a final site inspection prior to submitting the eNOT.
27. Have the MS4 sign the MS4 Acceptance statement on the eNOT in accordance with the
requirements in Part VII.J.
28. Prior to submitting a Notice of Termination, ensure for SMP(s) that are privately owned, the
Owner/Operator has a mechanism in place that requires operation and maintenance of the
practice(s) in accordance with the operation and maintenance plan, such as a deed covenant
in the Owner/Operator’s deed of record.
Stormwater Pollution Prevention Plan
Page 28
2241067
Page 374 of 1174
Page 375
29. Submit a complete Notice of Termination form electronically using the NYSDEC eNOT.
Coverage is terminated as of the termination date indicated in the Letter of Termination (LOT),
which is sent by NYSDEC after a complete eNOT is submitted.
30. Request and receive all SWPPP records from the Owner’s/Operator’s Engineer and archive
those records, along with the LOT, for a period of at least five (5) years from the date that
NYSDEC accepts a complete NOT submitted.
31. Implement the Post-Construction Inspections and Maintenance procedures outlined in
Appendix G.
32. The Owner/Operator must keep the SWPPP current so that it at all times accurately documents
the erosion and sediment controls practices that are being used or will be used during
construction, and all post-construction stormwater management practices that will be
constructed on the site. At a minimum, the Owner/Operator shall amend the SWPPP, including
construction drawings:
a) Whenever the current provisions prove to be ineffective in minimizing pollutants in
stormwater discharges from the project site;
b) Whenever there is a change in design, construction, or operation at the construction
site that has or could have an effect on the discharge of pollutants; and
c) To address issues or deficiencies identified during an inspection by the “Qualified
Inspector,” the Department, or other Regulatory Authority.
d) To document the final construction conditions.
33. When property ownership changes or when there is a change in operational control over the
construction plans and specifications, the original owner or operator must notify the new owner
or operator, in writing, of the requirement to obtain permit coverage by submitting a NOI with
the Department, in conformance with Part I.G.. For construction activities subject to the
requirements of a regulated, traditional land use control MS4, the original owner or operator
must also notify the MS4, in writing, of the change in ownership at least 30 calendar days prior
to the change in ownership.
7.2 Owner’s/Operator’s Engineer’s Responsibilities
1. Prepare the SWPPP using good engineering practices, best management practices, and in
compliance with all federal, state, and local regulatory requirements.
2. Prepare the electronic Notice of Intent (eNOI) (see Appendix B) and sign the “SWPPP Preparer
Certification Form.” Forward the Owner/Operator Certification Form to the Owner/Operator for
signature.
3. Provide copies of the SWPPP to the Town of West Seneca once all signatures and attachments
are complete.
4. Enter Contractor’s information in Section 7.5 “SWPPP Participants” once a Contractor is
selected by the Owner/Operator.
5. Participate in a pre-construction meeting which shall include the Town of West Seneca
representative, Owner/Operator, Qualified Inspector, Contractor, and all subcontractors to
discuss responsibilities as they relate to the implementation of this SWPPP.
Stormwater Pollution Prevention Plan
Page 29
2241067
Page 375 of 1174
Page 376
6. Update the SWPPP each time there is a significant modification to the pollution prevention
measures or a change of the principal Contractor working on the project who may disturb site
soil.
7.3 Contractor's Responsibilities
1. Sign the SWPPP Contractor's Certification Form contained within Appendix B and forward to
the Owner’s/Operator’s Engineer for inclusion in the Site Log Book.
2. Identify at least one Trained Contractor that will be responsible for implementation of this
SWPPP. Ensure that at least one Trained Contractor is on site on a daily basis when soil
disturbance activities are being performed. The Trained Contractor shall inspect the erosion
and sediment control practices and pollution prevention measures being implemented within
the active work area daily to ensure that they are being maintained in effective operating
conditions at all times. For corrective actions not requiring engineering design, the contractor
must begin implementing corrective actions within one business day and complete the
corrective actions within five business days. For corrective actions requiring engineering
design, the engineering design process must begin within five business days and the
contractor must complete the corrective action in a reasonable time frame but no later than
60 calendar days.
3. Provide the names and addresses of all subcontractors working on the project site. Require all
subcontractors who will be involved with construction activities that will result in soil
disturbance to identify at least one Trained Contractor that will be on site on a daily basis when
soil disturbance activities are being performed; and to sign a copy of the Subcontractor’s
Certification Form contained within Appendix B, then forward to the Owner’s/Operator’s
Engineer for inclusion into the Site Log Book. This information must be retained as part of the
Site Log Book.
4. Maintain a Spill Prevention and Response Plan in accordance with requirements outlined in
Section 5 of this SWPPP. This plan shall be provided to the Owner’s/Operator’s Engineer for
inclusion in the Site Log Book, prior to mobilization on-site.
5. Participate in a pre-construction meeting which shall include the Town of West Seneca
representative, Owner/Operator, Owner’s/Operator’s Engineer, Qualified Inspector, and all
subcontractors to discuss responsibilities as they relate to the implementation of this SWPPP.
6. If Contractor plans on utilizing adjacent properties for material, waste, borrow, or equipment
storage areas, or if Contractor plans to engage in industrial activity other than construction
(such as operating asphalt and/or concrete plants) at the site, Contractor shall submit
appropriate documentation to the Owner’s/Operator’s Engineer so that the SWPPP can be
modified accordingly.
7. Implement site stabilization, erosion and sediment control measures, and other requirements
of the SWPPP.
8. In accordance with the requirements in the most current version of the NYS Standards and
Specifications for Erosion and Sediment Control, conduct inspections of erosion and sediment
control measures installed at the site to ensure that they remain in effective operating
condition at all times. Prepare and retain written documentation of inspections as well as of
Stormwater Pollution Prevention Plan
Page 30
2241067
Page 376 of 1174
Page 377
all repairs/maintenance activities performed. This information must be retained as part of the
Site Log Book.
9. Begin implementing corrective actions within one (1) business day of receipt of notification by
the Qualified Inspector/Qualified Professional of any corrective actions. For corrective actions
not requiring engineering design, the contractor must begin implementing corrective actions
within one business day and complete the corrective actions within five business days. For
corrective actions requiring engineering design, the engineering design process must begin
within five business days and the contractor must complete the corrective action in a
reasonable time frame but no later than 60 calendar days.
10. Maintain a record of the date(s) and location(s) that soil restoration is performed in accordance
with the accompanying plans and NYSDEC Division of Water’s publication “Deep-Ripping and
Decompaction,” dated April 2008. A copy of this publication is provided in Appendix H. The
record that is to be maintained shall be a copy of the overall site grading plan delineating the
area(s) and date(s) that the soil was restored.
11. Upon completion of all construction at the site, the contractor responsible for overall SWPPP
Compliance shall sign the certification on their Contractor Certification Form indicating that:
a.) all temporary erosion and sediment control measures have been removed from the site, b.)
the on-site soils disturbed by construction activity have been restored in accordance with the
SWPPP and the NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction,”
and c.) all permanent stormwater management practices required by the SWPPP have been
installed in accordance with the contract documents.
7.4 Qualified Inspector’s/Qualified Professional’s Responsibilities
1. Participate in a pre-construction meeting with the Town of West Seneca representative,
Owner/Operator, Owner/Operator’s Engineer, Contractor, and their subcontractors to discuss
responsibilities as they relate to the implementation of this SWPPP.
2. Conduct an initial assessment of the site prior to the commencement of construction and
certify in an inspection report that the appropriate erosion and sediment control measures
described within this SWPPP have been adequately installed and implemented to ensure
overall preparedness of the site.
3. Provide on-site inspections to determine compliance with the SWPPP. Site inspections shall
occur at an interval of at least once every seven calendar days. A written inspection report
shall be provided to the Owner/Operator and general contractor within one business day of
the completion of the inspection, with any deficiencies identified. A sample inspection form is
provided in Appendix F.
4. Prepare an inspection report subsequent to each and every inspection that shall
include/address the items listed in Part IV.C.4 of GP-0-25-001. Sign all inspection reports and
maintain on site with the SWPPP.
5. Notify the owner/operator and appropriate contractor or subcontractor of any corrective
actions that need to be taken.
Stormwater Pollution Prevention Plan
Page 31
2241067
Page 377 of 1174
Page 378
6. Prepare a construction Site Log Book to be used as a record of all inspection reports generated
throughout the duration of construction. Ensure that the construction Site Log Book is
maintained and kept up-to-date throughout the duration of construction.
7. Review the Contractor’s SWPPP records on a periodic basis to ensure compliance with the
requirements for daily reports, soil restoration, inspections, and maintenance logs.
8. Based on the as-built survey and material testing certifications performed by others, the
Qualified Professional shall perform evaluations of the completed stormwater management
practices to determine whether they were constructed in accordance with this SWPPP.
9. The Qualified Professional shall conduct a final site assessment and prepare a certification
letter to the Owner/Operator indicating that, upon review of the material testing and inspection
reports prepared by the firm retained by the Owner/Operator, review of the completed
topographic survey, and evaluation of the completed stormwater management facilities, the
stormwater management facilities have been constructed substantially in accordance with the
contract documents and should function as designed.
10. Prepare the Notice of Termination (NOT). The Qualified Professional shall sign the NOT
Certifications VI (Final Stabilization) and VII (Post-construction Stormwater Management
Practices) and forward the NOT to the Owner/Operator for signature on Certification VIII
(Owner/Operator Certification).
11. The owner’s or operator’s coverage is terminated as of the termination date indicated in the
Letter of Termination (LOT), which is sent by NYSDEC after a complete eNOT is submitted.
12. Transfer the SWPPP documents, along with all NOI's, LOA, permit certificates, NOT's, LOT,
construction Site Log Book, and written records required by the General Permit to the
Owner/Operator for archiving.
Stormwater Pollution Prevention Plan
Page 32
2241067
Page 378 of 1174
Page 379
7.5 SWPPP Participants
1. Owner’s/Operator’s Engineer 3: Kristopher Winkler, PE
LaBella Associates, DPC
300 Pearl Street, Suite 130
Buffalo, NY 14202
Phone: (716) 483-3153
2. Owner/Operator 4: Home Leasing
75 South Clinton Avenue, Suite 700,
Rochester, NY 14604
Phone: 585-262-6210
3. Contractor5,6: Name and Title:
Company Name:
Mailing Address:
Phone:
Fax:
3
Refer to Appendix B for the SWPPP Preparer Certification Form.
4
Refer to Appendix B for the Owner/Operator Certification Form.
5
Refer to Appendix B for Contractor and Subcontractor Certification Form.
6
Contractor’s information to be entered once the Contractor has been selected.
Stormwater Pollution Prevention Plan
Page 33
2241067
Page 379 of 1174
Page 380
Appendix A:
FIGURES
A-1: Site Location Map
A-2: Soils Map
A-3: Historic Places Screening Map
A-4: Environmental Resource Map
A-5: FEMA Firm Map
A-6: Special Use Permit and SEQR Negative Declaration
A-7: Pre-Development Watershed Delineation Map
A-8: Post-Development Watershed Delineation Map
Page 380 of 1174
Page 381
Page 381 of 1174
Page 382
HARLEM ROAD
D
R OA
EK
RE
G AC
YU
CA
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
PROJECT LOCATION
cts\92100-92199\92112.00 - CONFIDENTIAL - WOH Gross Wetland Violation\DWG\9
CLIN
TON
STR
EET
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:40 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SITE LOCATION MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-1
Page 382 of 1174
Page 383
Page 383 of 1174
Page 384
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:42 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS MAP 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2a
Page 384 of 1174
Page 385
Page 385 of 1174
Page 386
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appen
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:43 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS LEGEND -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2b
Page 386 of 1174
Page 387
Page 387 of 1174
Page 388
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:45 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
SOILS TABLE -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-2c
Page 388 of 1174
Page 389
Page 389 of 1174
Page 390
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
Missing or invalid reference It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:45 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
SWPPP FIGURE - NOT FOR CONSTRUCTION
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
File: ..\references\A-3 Historic Places Screening Map (CRIS)\Titleblock - 8
DRAWING NAME:
date of such alteration, and a specific description of the alteration.
DRAWN BY: DATE: PROJECT NO.:
HISTORIC PLACES SCREENING MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-3
Page 390 of 1174
Page 391
Page 391 of 1174
Page 392
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appendix A\A_App
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:47 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
ENVIRONMENTAL RESOURCE MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-4
Page 392 of 1174
Page 393
Page 393 of 1174
Page 394
\\cash.lab\u\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\05_Design\Civil\LD-LA\Stormwater\Parts\Appen
A_FIGURES.dwg
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
4/20/2026 10:29:50 AM
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
FEMA FIRM MAP -- 04/20/2026 2241067
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2022 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON ST, WEST SENECA, NY 14224
A-5
Page 394 of 1174
Page 395
Page 395 of 1174
Page 396
Page 396 of 1174
Page 397
Page 397 of 1174
Page 398
Page 398 of 1174
Page 399
Page 399 of 1174
Page 400
Page 400 of 1174
Page 401
Page 401 of 1174
Page 402
AP-1
593.19
594.95
594.92 602.51
602.49
ES-1
ES-2 ES-3
DS
DS
600.04
FLAG
POLE
MB
LEGEND
SUBCATCHMENT BOUNDARY
Tc PATH
# SUBCATCHMENT
# REACH
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
7/26/2026 3:59:54 PM
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and SWPPP FIGURE - NOT FOR CONSTRUCTION
N DRAWING NAME:
date of such alteration, and a specific description of the alteration.
DRAWN BY: DATE: PROJECT NO.:
PRE-DEVELOPMENT WATERSHED DELINEATION MAP 04/20/2026 2241067
VERSION 21.1
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2026 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON STREET, BUFFALO, NY 14224
A-6 (REV 1)
Page 402 of 1174
Page 403
Page 403 of 1174
Page 404
AP-1
593.19
600.14
599
PS-7 PS-1
594.92 598 602.51
599 600
600
599
60 0 598
600
600
600
599
60
0
PS-1A
600
PS-6
600
600
PROPOSED
PLAYGROUND
9559598597965
PS-5
FFE=600.75'
519
600
600
60
600
595
596
PS-9
597
599
599
600
598
599
599
PS-2 599
59
599
9
599 599
600
600
598
599
598
599
PROPOSED SWALE
599
460 LF @ 1.0%
BOTTOM WIDTH 1' MIN.
DS
PS-3
DS
55998778
600
59
98
00 55559996767
596.50
6
559 8
596.50
600
PS-4
599 559998766 PS-8 599.84
559978
598
59 8 5
5965
59 PROPOSED SWALE
460 LF @ 1.0%
BOTTOM WIDTH 1' MIN.
595
598.87 9
5968 59
55995678
59 595.50
998765
5559
598
LEGEND
606.31 607.17
SUBCATCHMENT BOUNDARY
Tc PATH
# SUBCATCHMENT
# REACH
POND
#
It is a violation of New York Education Law Article 145 Sec.7209, for any person, unless acting under the direction of a licensed architect, ISSUED FOR:
professional engineer, or land surveyor, to alter an item in any way. If an item bearing the seal of an architect, engineer, or land surveyor is
N
7/27/2026 7:46:34 AM
altered; the altering architect, engineer, or land surveyor shall affix to the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
SWPPP FIGURE - NOT FOR CONSTRUCTION
DRAWING NAME: DRAWN BY: DATE: PROJECT NO.:
POST-DEVELOPMENT WATERSHED DELINEATION MAP 04/20/2026 2241067
VERSION 21.1
300 State Street, Suite 201
Rochester, NY 14614 PROJECT NAME: DRAWING NUMBER:
585-454-6110
labellapc.com © 2026 LaBella Associates
WEST SENECA APARTMENTS
2544 CLINTON STREET, BUFFALO, NY 14224
A-7 (REV 1)
Page 404 of 1174
Page 405
Page 405 of 1174
Page 406
Appendix B:
FORMS
Notice of Intent (NOI) Draft eNOI
MS4 SWPPP Acceptance Form
SWPPP Preparer Certification Form
Owner/Operator Certification Form
Contractor and Subcontractor Certification Forms
Notice of Termination (NOT)
Page 406 of 1174
Page 407
Page 407 of 1174
Page 408
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1
Construction General Permit
(CGP) Electronic Notice of
Intent (eNOI) GP-0-25-001
version 1.18
(Submission #: HQN-WSKP-J4899, version 1)
Details
Originally Started By Joseph Bognanno
Alternate Identifier West Seneca Apartments—Region 9
Submission ID HQN-WSKP-J4899
Status Draft
Form Input
Eligibility
Disturbance Threshold
1. Will the construction activity involve soil disturbances listed in Part I.A.1 of GP-0-
25-001?
Yes
1.a. Will any runoff from the site enter a sewer system classified as a combined
sewer?
No
1.b. Is this a remediation project being done under a Department approved work
plan (i.e. CERCLA, RCRA, Voluntary Cleanup Agreement, etc.) with a SWPPP which
meets the substantive requirements of GP-0-25-001?
No
1.c. Is the construction activity related to a stormwater discharge that does not
require a permit as described in 40 CFR 122.3(e), e.g. non-point source agriculture
or silviculture activities?
No
https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12 1/10
Page 408 of 1174
Page 409
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1
Other SPDES Permits
2. Will the discharge from the construction activity meet all conditions listed in Part
I.A.2 of GP-0-25-001?
Yes
Threatened and Endangered Species
3. Will the construction activity potentially adversely affect a species that is
endangered or threatened per Part I.A.3.?
No
State Historic Preservation Act (SHPA)
4. Is the construction activity designated by the Commissioner of the Office of
Parks, Recreation and Historic Preservation (OPRHP), pursuant to 9 NYCRR
§§428.12 or 428.13 as exempt from the SHPA review (see Attachment 2 of the Letter
of Resolution between NYSDEC and OPRHP, dated January 9, 2015)?
NONE PROVIDED
State Environmental Quality Review (SEQR)
5. Is the construction activity subject to SEQR (Part I.A.5.), or the equivalent
environmental review from another NYS or federal agency (Part I.A.6.)?
Yes
5.a. Has the owner/operator obtained documentation that the project review
pursuant to SEQR, or the equivalent, has been satisfied per Part I.A.5. or I.A.6. of
GP-0-25-001?
Yes
Uniform Procedures Act (UPA) Permits
6. Has the owner/operator obtained all necessary UPA permits from NYSDEC, or the
equivalent from another NYS or federal agency per Part I.A.7.a. of GP-0-25-001?
Select "Yes" if no UPA permits, or the equivalent, are required for this construction
activity.
Yes
Steep Slope
https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12 2/10
Page 409 of 1174
Page 410
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1
7. Is the construction activity within the watershed of surface waters of the State
classified as AA or AA-S identified utilizing the Stormwater Interactive Map on
NYSDEC’s website?
No
Owner/Operator Information
8. Owner/Operator Name
Home Leasing
9. Owner/Operator Contact Person Information
First and Last Name Phone E-mail
Angela Eicholtz 2489784420 [email protected]
10. Owner/Operator Mailing Address
75 South Clinton Avenue, Suite 700
Rochester, NY 14604
USA
11. Is the billing contact different from the Owner/Operator Contact?
No
12. What type of organization is the owner/operator?
Corporation
12.b. Is the owner/operator registered with the Department of State to do business
in New York State?
Yes
12.b.i. Department of State ID #
207792
The Department of State ID can be found using the following link:
Department of State | Division of Corporations
Site Information
13. Project/Site Name
West Seneca Apartments
14. Site Address
2544 Clinton Street
West Seneca, NY 14224
Erie
https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12 3/10
Page 410 of 1174
Page 411
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1
DEC Region
9
15. Site Latitude & Longitude
42.871757741927205,-78.78125301461476
Project Details
16. This eNOI submission is for:
A construction activity not part of a common plan of development or sale in accordance
with Part I.D.1.a.
17. Does the project type fall under Table 1 or Table 2 of Appendix B of GP-0-25-001?
If any portion of the construction activity falls under Table 2, regardless of the size
of the disturbance, select "Table 2".
Table 2
18. Consistent with Part III.B.1.c.i. of GP-0-25-001, provide a concise overview of the
project. Describe existing and proposed conditions, and include any other relevant
information.
The project proposes a redevelopment project with a 3-story 25,000 SF footprint multi-
family residence. There is an existing mansion on site that will be renovated to include
additional multi-family units. Additionally, there will be parking lots, new utility connections,
stormwater management systems, and overall site grading involved in this project
Enter the total project site acreage, the acreage to be disturbed, and the future impervious
area (acreage) within the disturbed area, rounded to the nearest tenth of an acre.
19. Total Site Area (acres)
16.2
20. Total Area to be Disturbed (acres)
5.4
21. Existing Impervious Area to be Disturbed (acres)
0.8
22. Future Impervious Area Within Disturbed Area (acres)
3.0
Nature of the project:
Redevelopment with increase in impervious area
23. Do you plan to disturb more than 5 acres of soil at any one time?
No
https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12 4/10
Page 411 of 1174
Page 412
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1
24. Indicate the percentage (%) of each Hydrologic Soil Group(HSG) at the site.
A (%)
0
B (%)
0
C (%)
0
D (%)
100
25. Enter the planned start and end dates of the disturbance activities.
Start Date
09/01/2027
End Date
03/01/2028
26. Identify the nearest surface waterbody(ies) to which construction site runoff will
discharge.
Cayuga Creek, Lower, and tribs - 0103-0007
27. Type of waterbody identified in question 26?
River Off Site
28. Has the surface waterbody in question 26 been identified as a 303(d) segment in
Appendix D of GP-0-25-001?
No
29. Is this project located in one of the Watersheds identified in Appendix C of GP-0-
25-001?
No
30. Will the project disturb soils within a State regulated wetland or the protected
100 foot adjacent area?
No
31. Does the site runoff enter a separate storm sewer system (including roadside
drains, swales, ditches, culverts, etc)?
No
32. Will future use of this site be an agricultural property as defined by the NYS
Agriculture and Markets Law?
No
https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12 5/10
Page 412 of 1174
Page 413
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1
33. Is this property owned by a state authority, state agency, federal government or
local government?
No
Required SWPPP Components
General SWPPP Requirements
34. Has a SWPPP been developed in conformance with the requirements in Part III.
of GP-0-25-001?
Yes
35. Does the SWPPP demonstrate consideration of the future physical risks due to
climate change pursuant to the CRRA, 6 NYCRR Part 490, and associated guidance
per Part III.A.2. of GP-0-25-001?
Yes
36. Has the required Erosion and Sediment Control component of the SWPPP been
developed in conformance with the current NYS Standards and Specifications for
Erosion and Sediment Control (aka Blue Book)?
Yes
37. Has the post-construction stormwater management practice component of the
SWPPP been developed in conformance with the NYS Stormwater Management
Design Manual?
Yes
37.a. Which version of the NYS Stormwater Management Design Manual was used
to develop the SWPPP?
2024
SWPPP Preparer
39. The Stormwater Pollution Prevention Plan (SWPPP) was prepared by:
Professional Engineer (P.E.)
40. Name of the person who prepared the SWPPP
Kristopher Winkler
41. SWPPP Preparer Organization Name
LaBella Associates
42. SWPPP Preparer Contact Information
First and Last Name Phone E-mail
Kristopher Winkler 7167683411 [email protected]
https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12 6/10
Page 413 of 1174
Page 414
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1
43. SWPPP Preparer Address
300 Pearl Street
Suite 130
Buffalo, NY 14202
Download SWPPP Preparer Certification Form
Please take the following steps to prepare and upload your preparer certification form:
1) Click on the link below to download a blank certification form
2) The certified SWPPP preparer should sign this form
3) Upload the completed form
Download SWPPP Preparer Certification Form
44. Please upload the SWPPP Preparer Certification
NONE PROVIDED
Comment
NONE PROVIDED
44.a. Has the SWPPP Preparer Certification Form been signed by the SWPPP
preparer in accordance with Part VII.J of GP-0-25-001?
NONE PROVIDED
Erosion & Sediment Control Criteria
45. Has a construction sequence schedule for the planned management practices
been prepared?
Yes
Post-Construction Criteria
Site Planning and Soil Restoration
46. Identify all site planning practices that were used to prepare the final site
plan/layout for the project.
Building Footprint Reduction
Sidewalk Reduction
Preservation of Undisturbed Area
Preservation of Buffers
Reduction of Clearing and Grading
47. Indicate which of the following soil restoration criteria was used to address the
requirements in Section 5.1.6 ("Soil Restoration") of the Design Manual.
All disturbed areas will be restored in accordance with the Soil Restoration requirements in
Table 5.3 of the Design Manual (see page 5-22).
https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12 7/10
Page 414 of 1174
Page 415
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1
Water Quality Criteria
49. Water Quality Sizing Criteria
Total WQv Total RRv Minimum Total WQv Sum of RRv
required provided RRv (acre- provided and WQv
(acre-feet) (acre-feet) feet) (acre-feet) provided
0.24 0.03 0.03 0.21 0.24
Water Quantity Criteria
50. Per Section 9.2.1.C.VI and VII of the 2024 Design Manual, is there 0% change to
hydrology that increases the discharge rate and volume from the project site?
Yes
Operation and Maintenance
53. Has a long-term Operation and Maintenance Plan for the post-construction
stormwater management practice(s) been developed?
Yes
53.a. Identify the entity responsible for the long-term Operation and Maintenance.
Property Owner
Post-Construction SMP Identification
54. Post-Construction RR Techniques and Standard SMPs
RR Techniques and Contributing Impervious Area Total Contributing Area
SMPs (acres) (acres)
Filtration Bioretention
1.0
(F-5)
55. Alternative SMPs
Contributing
Type of Manufacturer of the Name of the
Impervious Area
Alternative SMP Alternative SMP Alternative SMP
(acres)
Barracuda Max
Hydrodynamic ADS 2.28
S6
Other Permits
56. Identify other permits, existing and new, that are required for this project/facility.
None
https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12 8/10
Page 415 of 1174
Page 416
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1
57. Is this NOI for a change in owner/operator per Part I.G.?
No
MS4 SWPPP Acceptance
59. Will the construction activities be within the municipal boundary(ies) of
Traditional Land Use Control MS4 Operator(s) and discharge to the MS4(s)?
Yes
59.a. Which form is required per Part I.D.2.b.ii.?
MS4 SWPPP Acceptance Form
MS4 SWPPP Acceptance Form Download
Download the MS4 SWPPP Acceptance Form from the link below.
MS4 SWPPP Acceptance Form
60. MS4 Acceptance or No Jurisdiction Form Upload
NONE PROVIDED
Comment
NONE PROVIDED
60.a. Has the form been signed by the principal executive officer or ranking elected
official—or duly authorized representative of that person—in accordance with Part
VII.J. and submitted along with this NOI?
No
All forms submitted with the eNOI must be signed in accordance with Part VII.J. per
Part I.D.2.b. of GP-0-25-001.
Owner/Operator Certification
Owner/Operator Certification Form Download
Download the Owner/Operator Certification Form by clicking the link below.
Owner/Operator Certification Form
61. Upload Owner/Operator Certification Form
NONE PROVIDED
Comment
NONE PROVIDED
61.a. Has the Owner/Operator Certification Form from Appendix J been signed by
the owner/operator, or a representative of the owner/operator in accordance with
Part VII.J of GP-0-25-001 and uploaded to the eNOI?
No
https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12 9/10
Page 416 of 1174
Page 417
7/27/26, 8:55 AM NYSDEC eBusiness Portal System - Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001. Revision 1
All forms submitted with the eNOI must be signed in accordance with Part VII.J. per
Part I.D.2.b. of GP-0-25-001.
Additional Project Information
62. Enter any additional pertinent project information in the text box below.
NONE PROVIDED
https://nform-prod.dec.ny.gov/app/#/submissionwizard/ea47aba3-47ef-4702-8e38-18fda6040ce5/12
Page 417 of 10/10
1174
Page 418
MS4 SWPPP Acceptance Form
for construction activities seeking authorization under the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI
and submitted to NYSDEC electronically.)
I. Project Owner/Operator Information
1. Owner/Operator Name:
2. Contact Person:
3. Street Address:
4. City/State/Zip:
II. Project Site Information
5. Project/Site Name:
6. Street Address:
7. City/State/Zip:
III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance Information
8. SWPPP Reviewed by:
9. Title/Position:
10. Date Final SWPPP Reviewed and Accepted:
IV. Regulated MS4 Information
11. Name of MS4 Operator:
12. MS4 SPDES Permit Identification Number: NYR20A
13. Street Address:
14. City/State/Zip:
15. Telephone Number:
Page 1 of 2
Page 418 of 1174
Page 419
MS4 SWPPP Acceptance Form - continued
V. Certification Statement - MS4 Official (principal executive officer or ranking elected official) or
Duly Authorized Representative
I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project
identified in section II. of this form has been reviewed and meets the substantive requirements in the
SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP).
Note: The MS4 Operator, through the acceptance of the SWPPP, assumes no responsibility for the
accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of
the SWPPP by the MS4 Operator does not relieve the owner/operator or their SWPPP preparer of
responsibility or liability for errors or omissions in the plan.
Printed Name1:
Title/Position:
Signature:
Date:
VI. Additional Information
1 Printed name of the principal executive officer or ranking elected official for the MS4 Operator or their
duly authorized representative in accordance with CGP Part VII.J.2.
(NYSDEC - MS4 SWPPP Acceptance Form - January 2025)
Page 2 of 2
Page 419 of 1174
Page 420
SWPPP Preparer Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and
submitted to NYSDEC electronically.)
Project/Site Name:
eNOI Submission ID:
Owner/Operator Name:
Certification Statement – SWPPP Preparer
I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) has been
prepared in accordance with the requirements of GP-0-25-001. I certify under penalty
of law that the SWPPP and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge
and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
SWPPP Preparer First Name MI SWPPP Preparer Last Name
Signature Date
Revised: January 2025
Page 420 of 1174
Page 421
Owner/Operator Certification Form
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(In accordance with CGP Part I.D.2.b. or Part I.F.2. and 3., the completed form must be attached to the eNOI or the
Request to Continue Coverage, and submitted to NYSDEC electronically.
Project/Site Name: ________________________________________________________
eNOI Submission ID: _________________________________________________
eNOI Submitted by: Owner/Operator SWPPP Preparer Other
Certification Statement - Owner/Operator
I hereby certify that I read, and will comply with, the GP-0-25-001 permit requirements. I understand that
authorization to discharge under the permit for the project/site named above is dependent on receipt of a
Letter of Authorization (LOA) or a Letter of Continued Coverage (LOCC) from the New York State
Department of Environmental Conservation (NYSDEC) in accordance with CGP Part I.D.3.b. or Part I.F.4.
I am aware that there are significant penalties for submitting false information, including the possibility of
fine and imprisonment for knowing violations.
Owner/Operator First Name MI Owner/Operator Last Name
___________________________________________________________
Signature
________________________________
Date
Revised: January 2025
Page 421 of 1174
Page 422
eNOT Owner or Operator Certification
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I certify that I have met the requirements of CGP Part V.A.1., 2., 3., and 4. I certify under
penalty of law that this document and all attachments were prepared under my direction
or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for
knowing violations.
a. Printed name of the Owner or Operator:
b. Title/Position:
c. Signature:
d. Date:
Page 422 of 1174
Page 423
eNOT Qualified Inspector Certification – Final Stabilization
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.i., ii., and iii. or CGP Part
V.A.1.b.i., ii., and iii. have been achieved. I certify under penalty of law that this
document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the person or persons
who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are significant penalties for submitting
false information, including the possibility of fine and imprisonment for knowing
violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 423 of 1174
Page 424
eNOT Qualified Inspector Certification – SMPs
for construction activities seeking termination from the
SPDES General Permit for Stormwater Discharges from
Construction Activity, GP-0-25-001 (CGP)
(The completed form must be attached to the eNOT, which must be submitted
to NYSDEC electronically in accordance with CGP Part V.A.5.)
I. Project Owner/Operator Information
a. Owner/Operator Name:
b. Contact Person:
c. Street Address:
d. City/State/Zip:
II. Project Site Information
a. Project/Site Name:
b. Street Address:
c. City/State/Zip:
d. CGP SPDES Permit ID:
III. Certification Statement
I hereby certify that all the requirements in CGP Part V.A.1.a.iv. or CGP Part V.A.1.b.iv.
have been achieved. I certify under penalty of law that this document and all
attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
a. Printed name of the Qualified Inspector:
b. Title/Position:
c. Signature:
d. Date:
Page 424 of 1174
Page 425
Stormwater Pollution Prevention Plan
Contractor Certification Statement
(Responsible for overall SWPPP Compliance)
West Seneca
Town of West Seneca, Erie County, New York
This is to certify that the following contracting firm will be responsible for installing, constructing, repairing, inspecting and/or
maintaining the erosion and sediment control practices and post-construction stormwater management control practices
required by the SWPPP.
Contracting Firm Information
Name:
Address:
Telephone & Fax:
Trained Contractor(s) 1 Responsible for SWPPP Implementation (Provide name, title, and date of last training)
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
Prior to commencement of construction activity, the following certification shall be issued:
I hereby certify under penalty of law that I understand and agree to comply with the requirements of the SWPPP and agree to
implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner
or operator must comply with the requirements of the most current version of the New York State Pollutant Discharge
Elimination System (SPDES) Construction General Permit (CGP) for Stormwater Discharges from Construction Activities and
that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that
there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine
and imprisonment for knowing violations
Printed Name:
Title/Position:
Signature: Date:
Upon completion of construction activities, the following certification shall be issued, prior to issuance of the NOT:
I hereby certify that that all permanent stormwater management practices required by the SWPPP have been installed in
accordance with the contract documents. I further certify that all temporary erosion and sediment control measures have
been removed from the site, and that the on-site soils disturbed by construction activity have been restored in accordance
with the SWPPP and the NYSDEC Division of Water’s publication “Deep-Ripping and Decompaction”.
Printed Name:
Title/Position:
Signature: Date:
1 “Trained Contractor” means an employee from a contracting (construction) company that has received four (4) hours of Department endorsed training in proper erosion and sediment
control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the “trained contractor” shall receive four (4)
hours of training every three (3) years. It can also mean an employee from the contracting (construction) company that meets the “qualified inspector” qualifications (e.g. licensed
Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registe red Landscape Architect, provided they
have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil an d Water Conservation District, or other Department
endorsed entity). The “Trained Contractor” will be responsible for the day to day implementation of the SWPPP.
Page 425 of 1174
Page 426
Stormwater Pollution Prevention Plan
Subcontractor Certification Statement
(whose work involves soil disturbance)
West Seneca
Town of West Seneca, Erie County, New York
Each Subcontractor whose work will involve soil disturbance of any kind is required to complete and sign this Certification
Statement before commencing any construction activity at the site. This completed Certification Statement(s) shall be
maintained at the construction site in the Site Log Book.
Subcontracting Firm Information
Name:
Address:
Telephone & Fax:
Trained Contractor(s) 2 Responsible for SWPPP Implementation (Provide name, title, and date of last training)
Prior to commencement of construction activities, the following certification shall be issued:
I hereby certify under penalty of law that I understand and agree to comply with the requirements of the SWPPP and agree to
implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner
or operator must comply with the requirements of the most current version of the New York State Pollutant Discharge
Elimination System (SPDES) Construction General Permit (CGP) for Stormwater Discharges from Construction Activities and
that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that
there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine
and imprisonment for knowing violations
Printed Name:
Title/Position:
Signature: Date:
2 “Trained Contractor” means an employee from a contracting (construction) company that has received four (4) hours of Department endorsed training in proper erosion and sediment
control principles from a Soil and Water Conservation District, or other Department endorsed entity. After receiving the initial training, the “trained contractor” shall receive four (4)
hours of training every three (3) years. It can also mean an employee from the contracting (construction) company that meets the “qualified inspector” qualifications (e.g. licensed
Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registe red Landscape Architect, provided they
have received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil an d Water Conservation District, or other Department
endorsed entity). The “Trained Contractor” will be responsible for the day to day implementation of the SWPPP.
Page 426 of 1174
Page 427
Page 427 of 1174
Page 428
Appendix c:
Project evaluations and
design calculations
Page 428 of 1174
Page 429
Page 429 of 1174
Page 430
P= 1.00 inch
Total Area Existing Imperv Proposed Imperv Existing Disturbed Imperv Reduction
AREA
(Acres) (Acres) (Acres) Imperv Area (Acres) (Acres)
TO ALTERNATIVE PRACTICES 2.28 0.47 2.06 0.47 0%
TO AREA REDUCTION SMPS
SITE REMAINING AREA 13.84 0.62 0.95 0.35 0%
TOTAL SITE 16.12 1.09 3.01 0.82 0%
Water Quality Volume Calculation
Exist Disturbed Imperv Imperv Area (NEW Percent TOTAL WQV
Total Area WQv WQv Adjusted
New Development / Redevelopment WQv Treatment % Area (REDEVELOPMENT) DEVELOPMENT) Impervious Rv REQUIRED System Generated Notes
(Acres) (ft 3 ) (ft 3 )
(Acres) (Acres) % (ft 3 )
REDEVELOPMENT ALTERNATIVE 75% 0.47 0.47 - 100% 0.95 1,621 1,216
NEW DEVELOPMENT ALTERNATIVE 100% 1.81 - 1.59 88% 0.84 5,523 5,523
10,567
REDEVELOPMENT REMAINING AREA 25% 0.35 0.35 - 100% 0.95 1,207 302
NEW DEVELOPMENT REMAINING AREA 100% 13.49 - 0.33 2% 0.07 3,527 3,527
Minimum Runoff Reduction Volume Calculation
Total Impervious Area Added Percent MINIMUM RRv
Weighted S
AREA (NEW DEVELOPMENT) Soil Group A % Soil Group B % Soil Group C % Soil Group D % Impervious Rv REQUIRED System Generated Notes
Factor
(Acres) % (ft 3 )
TOTAL SITE 1.92 0% 0% 0% 100% 100% 0.95 0.20 1,324
Page 430 of 1174
Page 431
Page 431 of 1174
Page 432
Step 2 - Calculate Water Quality Volume
Is this project subject to Section 4.3 of the NYS Design Manual for Enhanced Phosphorus
Removal? No
What is the nature of this construction project? Redevelopment with increase in impervious area
Design Point: 1
Enter 90% Rainfall Event as P
P= 1.00 inches
Calculate Required WQv
Contributing Percent
Drainage Area Impervious Area WQv SMP
Area Impervious Rv
Number (Acres) (cf) Description
(Acres) %
Filtration
1 0.42 0.16 38 0.39 599
Bioretention
Flow Based
2 1.70 1.48 87 0.83 5,144 Alternative
Practice
Filtration
3 0.65 0.22 33 0.35 829
Bioretention
Filtration
4 0.68 0.48 71 0.69 1,692
Bioretention
Flow Based
5 0.43 0.43 100 0.95 1,483 Alternative
Practice
Flow Based
6 0.15 0.15 100 0.95 517 Alternative
Practice
Filtration
7 0.11 0.11 100 0.95 379
Bioretention
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Total 4.14 3.03 73 0.71 10642 Required WQv
Page 432 of 1174
Page 433
Page 433 of 1174
Page 434
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
1 0.42 0.16 38 0.39 599 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 250 sf
Enter Provided Filter Area Af 350 sf
Recalculated Water Quality Volume (based
WQv calc 840 cf
on provided filter area)
Calculate Runoff Reduction
RRv Provided 336 cf
This is the portion of the WQv that is not reduced in
WQv Treated 263 cf
the practice.
Page 434 of 1174
Page 435
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
3 0.65 0.22 33 0.35 829 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 345 sf
Enter Provided Filter Area Af 348 sf
Recalculated Water Quality Volume (based
WQv calc 835.2 cf
on provided filter area)
Calculate Runoff Reduction
RRv Provided 334 cf
This is the portion of the WQv that is not reduced in
WQv Treated 495 cf
the practice.
Page 435 of 1174
Page 436
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
4 0.68 0.48 71 0.69 1,692 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 705 sf
Enter Provided Filter Area Af 705 sf
Recalculated Water Quality Volume (based
WQv calc 1692 cf
on provided filter area)
Calculate Runoff Reduction
RRv Provided 677 cf
This is the portion of the WQv that is not reduced in
WQv Treated 1015 cf
the practice.
Page 436 of 1174
Page 437
Filtration Bioretention (F-5)
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
Filtration
7 0.11 0.11 100 0.95 379 1.00
Bioretention
Design Criteria
Enter underlying soil infiltration rate (based on
0 Underdrains required
geotechnical testing, refer to Appendix D)
Is the contributing area to the practice a
No
stormwater hotspot?
Is the practice the first in series for treatment
No
of a Level 1 (Infiltration Restricted) hotspot?
Is contributing area greater than max.
No
contributing area?
Enter depth to seasonal high water table (ft) 6
Enter depth to bedrock (ft) 6
Is pretreatment provided, in conformance with
Yes
Section 6.4.3.1
Enter average height of ponding (ft) 0.5
Enter depth of surface layer (inches) 3
Enter depth of filter media (ft) 2.5
Enter depth of drainage layer (inches) 10
Enter slope of maintenance access (%) 1
Enter width of maintenance access (ft) 12
Sizing Criteria
Value Units Notes
Permeability Flow Rate k 1 ft/day
Filter Time tf 2 days
Required Filter Area Af 158 sf
Enter Provided Filter Area Af 160 sf
Recalculated Water Quality Volume (based
WQv calc 384 cf
on provided filter area)
Calculate Runoff Reduction
RRv Provided 154 cf
This is the portion of the WQv that is not reduced in
WQv Treated 225 cf
the practice.
Page 437 of 1174
Page 438
Filtration Bioretention (F-5)
Total Area 1.86 acres
Total Impervious 1 acres
Total RRv Provided 1,500 cf
Total WQv Provided 1,999 cf
Page 438 of 1174
Page 439
Page 439 of 1174
Page 440
Water Quality Peak Flow Calclations
NYSDEC Water Quality Volume (WQv) & Water Quality Peak Flow (Qp) Calculation
Worksheet (REQUIRED Qp)
PROJECT INFORMATION
Total Drainage Area A: 2.28 ac
Impervious Area I: 2.06 ac
Percent Impervious 90.4 %
NYSDEC 90% Rainfall P: 1.00 in.
Time of Concentration Tc: 0.10 hrs
Rv: 0.86
WATER QUALITY VOLUME
Water Quality Volume WQv=([(P)*(Rv)*(A)]/12)*43560 WQv: 7,144 cf
WATER QUALITY PEAK FLOW (NEW DEVELOPMENT)
Runoff Volume Q=WQv/(A*3600) Q: 0.86 in.
2 ½
CN=1000/(10+5*P+10*Q-10(Q +1.25*Q*P) ) CN: 98.76
CN Rounded CN: 99
CN < or = 98 CN: 98
Initial Abstraction (Ia=200/CN-2) Ia: 0.04 in.
RATIO R=Ia/P R: 0.04
2
C0 = A*R +B*R +C C0 : 2.54
2
C1 = A*R +B*R +C C1 : -0.58
2
C2 = A*R +B*R +C C2 : -0.17
2
Unit Peak Discharge qu=10^(C0+C1*Log(Tc)+C2*(log(Tc)) ) qu: 900.33 cfs/mi2/in
Water Quality Peak Flow Qp=qu*A*Q/640 (100%) Qp: 2.77 cfs
REDVELOPMENT
Impeverious Area Reduction IC 0.00 %
WQv Treatment by Standard Practice SP 0.00 %
Runoff Reduction RR 0.00 %
Req. WQv% By Alt. Practice AP=(25-(% IC+%SP+%RR))*3: AP 75.0 %
Required Water Quality Peak Flow RD QP=(Qp*AP): RD Qp: 2.08 cfs
Page 1 of 1
Page 440 of 1174
Page 441
Page 441 of 1174
Page 442
Appendix d:
Pre-development stormwater
modeling
Page 442 of 1174
Page 443
Page 443 of 1174
Page 444
ES-1
W Site
ES-2 AP-1
E Site Cayuga Creek
ES-3
OFF-SITE DRAINAGE
Subcat Reach Pond Link Routing Diagram for D_App D_Pre-Development Model_REV 1
Prepared by Labella Associates, Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC
Page 444 of 1174
Page 445
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 2
Project Notes
Defined 9 rainfall events from NY-West Seneca IDF
Copied 9 events from NY-West Seneca 24-hr S1 storm
Page 445 of 1174
Page 446
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 3
Rainfall Events Listing (selected events)
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-yr NY-West Seneca 24-hr S1 1-yr Default 24.00 1 1.82 2
2 10-yr NY-West Seneca 24-hr S1 10-yr Default 24.00 1 3.14 2
3 100-yr NY-West Seneca 24-hr S1 100-yr Default 24.00 1 5.22 2
Page 446 of 1174
Page 447
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 4
Area Listing (all nodes)
Area CN Description
(acres) (subcatchment-numbers)
10.112 80 >75% Grass cover, Good, HSG D (ES-1, ES-2, ES-3)
1.069 98 Paved parking, HSG D (ES-1, ES-2, ES-3)
4.941 79 Woods, Fair, HSG D (ES-3)
16.122 81 TOTAL AREA
Page 447 of 1174
Page 448
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 5
Soil Listing (all nodes)
Area Soil Subcatchment
(acres) Group Numbers
0.000 HSG A
0.000 HSG B
0.000 HSG C
16.122 HSG D ES-1, ES-2, ES-3
0.000 Other
16.122 TOTAL AREA
Page 448 of 1174
Page 449
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 6
Ground Covers (all nodes)
HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment
(acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers
0.000 0.000 0.000 10.112 0.000 10.112 >75% Grass cover, Good ES-1,
ES-2,
ES-3
0.000 0.000 0.000 1.069 0.000 1.069 Paved parking ES-1,
ES-2,
ES-3
0.000 0.000 0.000 4.941 0.000 4.941 Woods, Fair ES-3
0.000 0.000 0.000 16.122 0.000 16.122 TOTAL AREA
Page 449 of 1174
Page 450
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 7
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=0.53"
Flow Length=391' Tc=14.0 min CN=82 Runoff=4.22 cfs 0.344 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=0.49"
Flow Length=390' Tc=19.4 min CN=81 Runoff=1.42 cfs 0.139 af
Subcatchment ES-3: OFF-SITE DRAINAGE Runoff Area=218,018 sf 0.26% Impervious Runoff Depth=0.42"
Flow Length=832' Slope=0.0100 '/' Tc=58.6 min CN=79 Runoff=0.93 cfs 0.175 af
Reach AP-1: Cayuga Creek Inflow=5.58 cfs 0.658 af
Outflow=5.58 cfs 0.658 af
Total Runoff Area = 16.122 ac Runoff Volume = 0.658 af Average Runoff Depth = 0.49"
93.37% Pervious = 15.053 ac 6.63% Impervious = 1.069 ac
Page 450 of 1174
Page 451
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment ES-1: W Site
Runoff = 4.22 cfs @ 12.16 hrs, Volume= 0.344 af, Depth= 0.53"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
Runoff
4.22 cfs
NY-West Seneca 24-hr S1 1-yr
4
Rainfall=1.82"
Runoff Area=337,194 sf
Runoff Volume=0.344 af
3
Runoff Depth=0.53"
Flow (cfs)
Flow Length=391'
Tc=14.0 min
2
CN=82
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 451 of 1174
Page 452
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 9
Summary for Subcatchment ES-2: E Site
Runoff = 1.42 cfs @ 12.25 hrs, Volume= 0.139 af, Depth= 0.49"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
1.42 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
Runoff Area=147,058 sf
Runoff Volume=0.139 af
1
Runoff Depth=0.49"
Flow (cfs)
Flow Length=390'
Tc=19.4 min
CN=81
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 452 of 1174
Page 453
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment ES-3: OFF-SITE DRAINAGE
Runoff = 0.93 cfs @ 12.89 hrs, Volume= 0.175 af, Depth= 0.42"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
2,218 80 >75% Grass cover, Good, HSG D
570 98 Paved parking, HSG D
215,230 79 Woods, Fair, HSG D
218,018 79 Weighted Average
217,448 99.74% Pervious Area
570 0.26% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
34.2 100 0.0100 0.05 Sheet Flow, 100'
Woods: Light underbrush n= 0.400 P2= 2.20"
24.4 732 0.0100 0.50 Shallow Concentrated Flow, REMAINING
Woodland Kv= 5.0 fps
58.6 832 Total
Subcatchment ES-3: OFF-SITE DRAINAGE
Hydrograph
Runoff
1
0.93 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
Runoff Area=218,018 sf
Runoff Volume=0.175 af
Runoff Depth=0.42"
Flow (cfs)
Flow Length=832'
Slope=0.0100 '/'
Tc=58.6 min
CN=79
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 453 of 1174
Page 454
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 11
Summary for Reach AP-1: Cayuga Creek
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 16.122 ac, 6.63% Impervious, Inflow Depth = 0.49" for 1-yr event
Inflow = 5.58 cfs @ 12.18 hrs, Volume= 0.658 af
Outflow = 5.58 cfs @ 12.18 hrs, Volume= 0.658 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
5.58 cfs Outflow
6
5.58 cfs
Inflow Area=16.122 ac
5
4
Flow (cfs)
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 454 of 1174
Page 455
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 12
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=1.49"
Flow Length=391' Tc=14.0 min CN=82 Runoff=12.32 cfs 0.961 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=1.42"
Flow Length=390' Tc=19.4 min CN=81 Runoff=4.40 cfs 0.400 af
Subcatchment ES-3: OFF-SITE DRAINAGE Runoff Area=218,018 sf 0.26% Impervious Runoff Depth=1.29"
Flow Length=832' Slope=0.0100 '/' Tc=58.6 min CN=79 Runoff=3.29 cfs 0.539 af
Reach AP-1: Cayuga Creek Inflow=17.02 cfs 1.900 af
Outflow=17.02 cfs 1.900 af
Total Runoff Area = 16.122 ac Runoff Volume = 1.900 af Average Runoff Depth = 1.41"
93.37% Pervious = 15.053 ac 6.63% Impervious = 1.069 ac
Page 455 of 1174
Page 456
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 13
Summary for Subcatchment ES-1: W Site
Runoff = 12.32 cfs @ 12.15 hrs, Volume= 0.961 af, Depth= 1.49"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
Runoff
13 12.32 cfs
12 NY-West Seneca 24-hr S1 10-yr
11 Rainfall=3.14"
10
Runoff Area=337,194 sf
Runoff Volume=0.961 af
9
Runoff Depth=1.49"
8
Flow (cfs)
Flow Length=391'
7
Tc=14.0 min
6
CN=82
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 456 of 1174
Page 457
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 14
Summary for Subcatchment ES-2: E Site
Runoff = 4.40 cfs @ 12.23 hrs, Volume= 0.400 af, Depth= 1.42"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
Runoff
4.40 cfs
NY-West Seneca 24-hr S1 10-yr
4 Rainfall=3.14"
Runoff Area=147,058 sf
Runoff Volume=0.400 af
3 Runoff Depth=1.42"
Flow (cfs)
Flow Length=390'
Tc=19.4 min
2 CN=81
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 457 of 1174
Page 458
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 15
Summary for Subcatchment ES-3: OFF-SITE DRAINAGE
Runoff = 3.29 cfs @ 12.82 hrs, Volume= 0.539 af, Depth= 1.29"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Area (sf) CN Description
2,218 80 >75% Grass cover, Good, HSG D
570 98 Paved parking, HSG D
215,230 79 Woods, Fair, HSG D
218,018 79 Weighted Average
217,448 99.74% Pervious Area
570 0.26% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
34.2 100 0.0100 0.05 Sheet Flow, 100'
Woods: Light underbrush n= 0.400 P2= 2.20"
24.4 732 0.0100 0.50 Shallow Concentrated Flow, REMAINING
Woodland Kv= 5.0 fps
58.6 832 Total
Subcatchment ES-3: OFF-SITE DRAINAGE
Hydrograph
Runoff
3.29 cfs
NY-West Seneca 24-hr S1 10-yr
3 Rainfall=3.14"
Runoff Area=218,018 sf
Runoff Volume=0.539 af
Runoff Depth=1.29"
Flow (cfs)
2 Flow Length=832'
Slope=0.0100 '/'
Tc=58.6 min
CN=79
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 458 of 1174
Page 459
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 10-yr Rainfall=3.14"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 16
Summary for Reach AP-1: Cayuga Creek
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 16.122 ac, 6.63% Impervious, Inflow Depth = 1.41" for 10-yr event
Inflow = 17.02 cfs @ 12.18 hrs, Volume= 1.900 af
Outflow = 17.02 cfs @ 12.18 hrs, Volume= 1.900 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
19 Outflow
17.02 cfs
18
17
17.02 cfs
Inflow Area=16.122 ac
16
15
14
13
12
11
Flow (cfs)
10
9
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 459 of 1174
Page 460
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 17
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment ES-1: W Site Runoff Area=337,194 sf 11.34% Impervious Runoff Depth=3.28"
Flow Length=391' Tc=14.0 min CN=82 Runoff=27.59 cfs 2.114 af
Subcatchment ES-2: E Site Runoff Area=147,058 sf 5.28% Impervious Runoff Depth=3.18"
Flow Length=390' Tc=19.4 min CN=81 Runoff=10.17 cfs 0.895 af
Subcatchment ES-3: OFF-SITE DRAINAGE Runoff Area=218,018 sf 0.26% Impervious Runoff Depth=2.99"
Flow Length=832' Slope=0.0100 '/' Tc=58.6 min CN=79 Runoff=8.11 cfs 1.248 af
Reach AP-1: Cayuga Creek Inflow=39.07 cfs 4.256 af
Outflow=39.07 cfs 4.256 af
Total Runoff Area = 16.122 ac Runoff Volume = 4.256 af Average Runoff Depth = 3.17"
93.37% Pervious = 15.053 ac 6.63% Impervious = 1.069 ac
Page 460 of 1174
Page 461
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 18
Summary for Subcatchment ES-1: W Site
Runoff = 27.59 cfs @ 12.15 hrs, Volume= 2.114 af, Depth= 3.28"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
38,223 98 Paved parking, HSG D
298,971 80 >75% Grass cover, Good, HSG D
337,194 82 Weighted Average
298,971 88.66% Pervious Area
38,223 11.34% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment ES-1: W Site
Hydrograph
30 Runoff
27.59 cfs
28
NY-West Seneca 24-hr S1 100-yr
26
Rainfall=5.22"
24
Runoff Area=337,194 sf
22
Runoff Volume=2.114 af
20
Runoff Depth=3.28"
18
Flow Length=391'
Flow (cfs)
16
Tc=14.0 min
14
CN=82
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 461 of 1174
Page 462
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 19
Summary for Subcatchment ES-2: E Site
Runoff = 10.17 cfs @ 12.22 hrs, Volume= 0.895 af, Depth= 3.18"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
7,764 98 Paved parking, HSG D
139,294 80 >75% Grass cover, Good, HSG D
147,058 81 Weighted Average
139,294 94.72% Pervious Area
7,764 5.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
13.3 100 0.0150 0.13 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
6.1 290 0.0130 0.80 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
19.4 390 Total
Subcatchment ES-2: E Site
Hydrograph
11 Runoff
10.17 cfs
10 NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
9
Runoff Area=147,058 sf
8 Runoff Volume=0.895 af
7 Runoff Depth=3.18"
Flow Length=390'
Flow (cfs)
6
Tc=19.4 min
5 CN=81
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 462 of 1174
Page 463
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 20
Summary for Subcatchment ES-3: OFF-SITE DRAINAGE
Runoff = 8.11 cfs @ 12.77 hrs, Volume= 1.248 af, Depth= 2.99"
Routed to Reach AP-1 : Cayuga Creek
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
2,218 80 >75% Grass cover, Good, HSG D
570 98 Paved parking, HSG D
215,230 79 Woods, Fair, HSG D
218,018 79 Weighted Average
217,448 99.74% Pervious Area
570 0.26% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
34.2 100 0.0100 0.05 Sheet Flow, 100'
Woods: Light underbrush n= 0.400 P2= 2.20"
24.4 732 0.0100 0.50 Shallow Concentrated Flow, REMAINING
Woodland Kv= 5.0 fps
58.6 832 Total
Subcatchment ES-3: OFF-SITE DRAINAGE
Hydrograph
9 Runoff
8.11 cfs
8 NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
7
Runoff Area=218,018 sf
Runoff Volume=1.248 af
6
Runoff Depth=2.99"
Flow Length=832'
Flow (cfs)
5
Slope=0.0100 '/'
4 Tc=58.6 min
CN=79
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 463 of 1174
Page 464
WEST SENECA - PRE DEVELOPMENT
D_App D_Pre-Development Model_REV 1 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 21
Summary for Reach AP-1: Cayuga Creek
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 16.122 ac, 6.63% Impervious, Inflow Depth = 3.17" for 100-yr event
Inflow = 39.07 cfs @ 12.17 hrs, Volume= 4.256 af
Outflow = 39.07 cfs @ 12.17 hrs, Volume= 4.256 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach AP-1: Cayuga Creek
Hydrograph
Inflow
39.07 cfs Outflow
42
40
38
39.07 cfs
Inflow Area=16.122 ac
36
34
32
30
28
26
Flow (cfs)
24
22
20
18
16
14
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 464 of 1174
Page 465
Page 465 of 1174
Page 466
Appendix e:
Post-development
stormwater modeling
Page 466 of 1174
Page 467
Page 467 of 1174
Page 468
PS-1A
PS-1 BIO-1
Filtration Bioretention
BIO-1A
Filtration Bioretention
PS-2
PS-6 CH-1 DP-1 PS-7
Chambers Design Point
PS-5 PS-8
8R 9R
15" Pipe East Swale
PS-3 BIO-2 PS-9
Filtration Bioretention OFF-SITE DRAINAGE
PS-4 BIO-3
Filtration Bioretention
Subcat Reach Pond Link Routing Diagram for E_App E_Post-Development Model_REV 2
Prepared by Labella Associates, Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC
Page 468 of 1174
Page 469
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 2
Project Notes
Copied 9 events from NY-West Seneca 24-hr S1 storm
Page 469 of 1174
Page 470
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 3
Rainfall Events Listing (selected events)
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-yr NY-West Seneca 24-hr S1 1-yr Default 24.00 1 1.82 2
2 25-yr NY-West Seneca 24-hr S1 25-yr Default 24.00 1 3.84 2
3 100-yr NY-West Seneca 24-hr S1 100-yr Default 24.00 1 5.22 2
Page 470 of 1174
Page 471
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 4
Area Listing (selected nodes)
Area CN Description
(acres) (subcatchment-numbers)
8.136 80 >75% Grass cover, Good, HSG D (PS-1, PS-1A, PS-2, PS-3, PS-4, PS-7, PS-8,
PS-9)
3.052 98 Paved parking, HSG D (PS-1, PS-1A, PS-2, PS-3, PS-4, PS-5, PS-6, PS-9)
4.935 79 Woods, Fair, HSG D (PS-9)
16.122 83 TOTAL AREA
Page 471 of 1174
Page 472
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 5
Soil Listing (selected nodes)
Area Soil Subcatchment
(acres) Group Numbers
0.000 HSG A
0.000 HSG B
0.000 HSG C
16.122 HSG D PS-1, PS-1A, PS-2, PS-3, PS-4, PS-5, PS-6, PS-7, PS-8, PS-9
0.000 Other
16.122 TOTAL AREA
Page 472 of 1174
Page 473
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 6
Ground Covers (selected nodes)
HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment
(acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers
0.000 0.000 0.000 8.136 0.000 8.136 >75% Grass cover, Good PS-1,
PS-1A,
PS-2,
PS-3,
PS-4,
PS-7,
PS-8,
PS-9
0.000 0.000 0.000 3.052 0.000 3.052 Paved parking PS-1,
PS-1A,
PS-2,
PS-3,
PS-4,
PS-5,
PS-6,
PS-9
0.000 0.000 0.000 4.935 0.000 4.935 Woods, Fair PS-9
0.000 0.000 0.000 16.122 0.000 16.122 TOTAL AREA
Page 473 of 1174
Page 474
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 7
Pipe Listing (selected nodes)
Line# Node In-Invert Out-Invert Length Slope n Width Diam/Height Inside-Fill Node
Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) Name
1 PS-8 0.00 0.00 350.0 0.0100 0.013 0.0 12.0 0.0
2 8R 591.85 588.49 350.0 0.0096 0.013 0.0 15.0 0.0
3 BIO-1 594.58 594.33 25.0 0.0100 0.012 0.0 12.0 0.0
4 BIO-1A 594.58 594.33 25.0 0.0100 0.012 0.0 6.0 0.0
5 BIO-2 592.58 591.92 132.0 0.0050 0.012 0.0 12.0 0.0
6 BIO-3 591.58 591.30 28.0 0.0100 0.012 0.0 12.0 0.0
7 CH-1 590.50 589.25 120.0 0.0104 0.013 0.0 8.0 0.0
Page 474 of 1174
Page 475
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 8
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=18,210 sf 38.59% Impervious Runoff Depth=0.77"
Tc=6.0 min CN=87 Runoff=0.52 cfs 0.027 af
Subcatchment PS-1A: Runoff Area=10,120 sf 38.46% Impervious Runoff Depth=0.77"
Tc=6.0 min CN=87 Runoff=0.29 cfs 0.015 af
Subcatchment PS-2: Runoff Area=74,205 sf 86.99% Impervious Runoff Depth=1.40"
Tc=6.0 min CN=96 Runoff=3.84 cfs 0.199 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=0.72"
Tc=6.0 min CN=86 Runoff=0.74 cfs 0.039 af
Subcatchment PS-4: Runoff Area=32,374 sf 64.64% Impervious Runoff Depth=1.08"
Tc=6.0 min CN=92 Runoff=1.32 cfs 0.067 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=1.60"
Tc=6.0 min CN=98 Runoff=1.06 cfs 0.057 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=1.60"
Tc=6.0 min CN=98 Runoff=0.37 cfs 0.020 af
Subcatchment PS-7: Runoff Area=242,510 sf 0.00% Impervious Runoff Depth=0.46"
Flow Length=391' Tc=14.0 min CN=80 Runoff=2.46 cfs 0.212 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=0.46"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=0.40 cfs 0.047 af
Subcatchment PS-9: OFF-SITE DRAINAGE Runoff Area=217,757 sf 0.78% Impervious Runoff Depth=0.42"
Flow Length=857' Slope=0.0100 '/' Tc=59.4 min CN=79 Runoff=0.92 cfs 0.175 af
Reach 8R: 15" Pipe Avg. Flow Depth=0.35' Max Vel=3.87 fps Inflow=1.10 cfs 0.222 af
0" Round Pipe n=0.013 L=350.0' S=0.0096 '/' Capacity=6.33 cfs Outflow=1.10 cfs 0.222 af Overflow=0.00 cfs 0.000 af
Reach 9R: East Swale Avg. Flow Depth=0.21' Max Vel=2.04 fps Inflow=1.11 cfs 0.222 af
n=0.022 L=460.0' S=0.0101 '/' Capacity=303.17 cfs Outflow=1.10 cfs 0.222 af
Reach DP-1: Design Point Inflow=2.94 cfs 0.810 af
Outflow=2.94 cfs 0.810 af
Pond BIO-1: Filtration Bioretention Peak Elev=598.47' Storage=780 cf Inflow=0.52 cfs 0.027 af
Primary=0.01 cfs 0.027 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.01 cfs 0.027 af
Pond BIO-1A: Filtration Bioretention Peak Elev=597.88' Storage=454 cf Inflow=0.29 cfs 0.015 af
Primary=0.00 cfs 0.015 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.00 cfs 0.015 af
Pond BIO-2: Filtration Bioretention Peak Elev=596.51' Storage=1,048 cf Inflow=0.74 cfs 0.039 af
Primary=0.02 cfs 0.039 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.02 cfs 0.039 af
Page 475 of 1174
Page 476
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 9
Pond BIO-3: Filtration Bioretention Peak Elev=595.48' Storage=1,854 cf Inflow=1.32 cfs 0.067 af
Primary=0.03 cfs 0.067 af Secondary=0.00 cfs 0.000 af Tertiary=0.00 cfs 0.000 af Outflow=0.03 cfs 0.067 af
Pond CH-1: Chambers Peak Elev=592.21' Storage=7,377 cf Inflow=5.27 cfs 0.276 af
Outflow=0.38 cfs 0.229 af
Total Runoff Area = 16.122 ac Runoff Volume = 0.857 af Average Runoff Depth = 0.64"
81.07% Pervious = 13.071 ac 18.93% Impervious = 3.052 ac
Page 476 of 1174
Page 477
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment PS-1:
Runoff = 0.52 cfs @ 12.04 hrs, Volume= 0.027 af, Depth= 0.77"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
7,027 98 Paved parking, HSG D
11,183 80 >75% Grass cover, Good, HSG D
18,210 87 Weighted Average
11,183 61.41% Pervious Area
7,027 38.59% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
Runoff
0.55
0.52 cfs
0.5 NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
0.45
Runoff Area=18,210 sf
0.4 Runoff Volume=0.027 af
0.35 Runoff Depth=0.77"
Flow (cfs)
0.3
Tc=6.0 min
CN=87
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 477 of 1174
Page 478
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment PS-1A:
Runoff = 0.29 cfs @ 12.04 hrs, Volume= 0.015 af, Depth= 0.77"
Routed to Pond BIO-1A : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
3,892 98 Paved parking, HSG D
6,228 80 >75% Grass cover, Good, HSG D
10,120 87 Weighted Average
6,228 61.54% Pervious Area
3,892 38.46% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1A:
Hydrograph
0.32
Runoff
0.3 0.29 cfs
0.28 NY-West Seneca 24-hr S1 1-yr
0.26 Rainfall=1.82"
0.24 Runoff Area=10,120 sf
0.22 Runoff Volume=0.015 af
0.2 Runoff Depth=0.77"
Flow (cfs)
0.18
Tc=6.0 min
0.16
CN=87
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 478 of 1174
Page 479
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 12
Summary for Subcatchment PS-2:
Runoff = 3.84 cfs @ 12.04 hrs, Volume= 0.199 af, Depth= 1.40"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
64,548 98 Paved parking, HSG D
9,657 80 >75% Grass cover, Good, HSG D
74,205 96 Weighted Average
9,657 13.01% Pervious Area
64,548 86.99% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
Runoff
4 3.84 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
Runoff Area=74,205 sf
3
Runoff Volume=0.199 af
Runoff Depth=1.40"
Flow (cfs)
Tc=6.0 min
2 CN=96
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 479 of 1174
Page 480
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 13
Summary for Subcatchment PS-3:
Runoff = 0.74 cfs @ 12.04 hrs, Volume= 0.039 af, Depth= 0.72"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
0.8 Runoff
0.74 cfs
0.75
NY-West Seneca 24-hr S1 1-yr
0.7
Rainfall=1.82"
0.65
0.6
Runoff Area=28,267 sf
0.55 Runoff Volume=0.039 af
0.5 Runoff Depth=0.72"
Flow (cfs)
0.45 Tc=6.0 min
0.4 CN=86
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 480 of 1174
Page 481
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 14
Summary for Subcatchment PS-4:
Runoff = 1.32 cfs @ 12.04 hrs, Volume= 0.067 af, Depth= 1.08"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
11,446 80 >75% Grass cover, Good, HSG D
32,374 92 Weighted Average
11,446 35.36% Pervious Area
20,928 64.64% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
1.32 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
Runoff Area=32,374 sf
1 Runoff Volume=0.067 af
Runoff Depth=1.08"
Flow (cfs)
Tc=6.0 min
CN=92
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 481 of 1174
Page 482
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 15
Summary for Subcatchment PS-5:
Runoff = 1.06 cfs @ 12.04 hrs, Volume= 0.057 af, Depth= 1.60"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
1.06 cfs
NY-West Seneca 24-hr S1 1-yr
1
Rainfall=1.82"
Runoff Area=18,756 sf
Runoff Volume=0.057 af
Runoff Depth=1.60"
Flow (cfs)
Tc=6.0 min
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 482 of 1174
Page 483
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 16
Summary for Subcatchment PS-6:
Runoff = 0.37 cfs @ 12.04 hrs, Volume= 0.020 af, Depth= 1.60"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
0.4
0.37 cfs
0.38
0.36
NY-West Seneca 24-hr S1 1-yr
0.34 Rainfall=1.82"
0.32
Runoff Area=6,622 sf
0.3
0.28 Runoff Volume=0.020 af
0.26 Runoff Depth=1.60"
0.24
Flow (cfs)
0.22
Tc=6.0 min
0.2 CN=98
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 483 of 1174
Page 484
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 17
Summary for Subcatchment PS-7:
Runoff = 2.46 cfs @ 12.17 hrs, Volume= 0.212 af, Depth= 0.46"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
242,510 80 >75% Grass cover, Good, HSG D
242,510 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
Runoff
2.46 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
2 Runoff Area=242,510 sf
Runoff Volume=0.212 af
Runoff Depth=0.46"
Flow (cfs)
Flow Length=391'
Tc=14.0 min
1
CN=80
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 484 of 1174
Page 485
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 18
Summary for Subcatchment PS-8:
Runoff = 0.40 cfs @ 12.36 hrs, Volume= 0.047 af, Depth= 0.46"
Routed to Reach 9R : East Swale
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
0.44 Runoff
0.42 0.40 cfs
0.4 NY-West Seneca 24-hr S1 1-yr
0.38
0.36 Rainfall=1.82"
0.34 Runoff Area=53,474 sf
0.32
0.3 Runoff Volume=0.047 af
0.28 Runoff Depth=0.46"
0.26
Flow (cfs)
0.24 Flow Length=821'
0.22 Slope=0.0100 '/'
0.2
0.18 Tc=25.7 min
0.16 CN=80
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 485 of 1174
Page 486
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 19
Summary for Subcatchment PS-9: OFF-SITE DRAINAGE
Runoff = 0.92 cfs @ 12.87 hrs, Volume= 0.175 af, Depth= 0.42"
Routed to Reach 9R : East Swale
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Area (sf) CN Description
1,089 80 >75% Grass cover, Good, HSG D
1,699 98 Paved parking, HSG D
214,969 79 Woods, Fair, HSG D
217,757 79 Weighted Average
216,058 99.22% Pervious Area
1,699 0.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
20.0 600 0.0100 0.50 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
34.2 100 0.0100 0.05 Sheet Flow, 100'
Woods: Light underbrush n= 0.400 P2= 2.20"
5.2 157 0.0100 0.50 Shallow Concentrated Flow, Swale
Woodland Kv= 5.0 fps
59.4 857 Total
Subcatchment PS-9: OFF-SITE DRAINAGE
Hydrograph
1 Runoff
0.92 cfs
NY-West Seneca 24-hr S1 1-yr
Rainfall=1.82"
Runoff Area=217,757 sf
Runoff Volume=0.175 af
Runoff Depth=0.42"
Flow (cfs)
Flow Length=857'
Slope=0.0100 '/'
Tc=59.4 min
CN=79
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 486 of 1174
Page 487
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 20
Summary for Reach 8R: 15" Pipe
[52] Hint: Inlet/Outlet conditions not evaluated
Inflow Area = 6.227 ac, 0.63% Impervious, Inflow Depth = 0.43" for 1-yr event
Inflow = 1.10 cfs @ 12.82 hrs, Volume= 0.222 af
Outflow = 1.10 cfs @ 12.84 hrs, Volume= 0.222 af, Atten= 0%, Lag= 1.1 min
Routed to Reach DP-1 : Design Point
Overflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Max. Velocity= 3.87 fps, Min. Travel Time= 1.5 min
Avg. Velocity = 1.88 fps, Avg. Travel Time= 3.1 min
Peak Storage= 100 cf @ 12.84 hrs
Average Depth at Peak Storage= 0.35' , Surface Width= 1.13'
Defined Flood Depth= 598.00' Flow Area= 100.4 sf, Capacity= -12,672.78 cfs
Bank-Full Depth= 1.25' Flow Area= 1.2 sf, Capacity= 6.33 cfs
Any excess flow will be diverted to the secondary overflow
15.0" Round Pipe
n= 0.013 Corrugated PE, smooth interior
Length= 350.0' Slope= 0.0096 '/'
Inlet Invert= 591.85', Outlet Invert= 588.49'
Page 487 of 1174
Page 488
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 21
Reach 8R: 15" Pipe
Hydrograph
Inflow
1.10 cfs Outflow
Overflow
1.10 cfs
Inflow Area=6.227 ac
Avg. Flow Depth=0.35'
1
Max Vel=3.87 fps
15.0"
Round Pipe
Flow (cfs)
n=0.013
L=350.0'
S=0.0096 '/'
Capacity=6.33 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 488 of 1174
Page 489
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 22
Summary for Reach 9R: East Swale
Inflow Area = 6.227 ac, 0.63% Impervious, Inflow Depth = 0.43" for 1-yr event
Inflow = 1.11 cfs @ 12.75 hrs, Volume= 0.222 af
Outflow = 1.10 cfs @ 12.82 hrs, Volume= 0.222 af, Atten= 0%, Lag= 4.3 min
Routed to Reach 8R : 15" Pipe
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Max. Velocity= 2.04 fps, Min. Travel Time= 3.8 min
Avg. Velocity = 0.99 fps, Avg. Travel Time= 7.8 min
Peak Storage= 249 cf @ 12.82 hrs
Average Depth at Peak Storage= 0.21' , Surface Width= 3.24'
Bank-Full Depth= 3.00' Flow Area= 33.0 sf, Capacity= 303.17 cfs
2.00' x 3.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 3.0 '/' Top Width= 20.00'
Length= 460.0' Slope= 0.0101 '/'
Inlet Invert= 599.00', Outlet Invert= 594.35'
Reach 9R: East Swale
Hydrograph
Inflow
1.11 cfs Outflow
1.10 cfs
Inflow Area=6.227 ac
1 Avg. Flow Depth=0.21'
Max Vel=2.04 fps
n=0.022
Flow (cfs)
L=460.0'
S=0.0101 '/'
Capacity=303.17 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 489 of 1174
Page 490
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 23
Summary for Reach DP-1: Design Point
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 16.122 ac, 18.93% Impervious, Inflow Depth > 0.60" for 1-yr event
Inflow = 2.94 cfs @ 12.18 hrs, Volume= 0.810 af
Outflow = 2.94 cfs @ 12.18 hrs, Volume= 0.810 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
2.94 cfs Outflow
3
2.94 cfs
Inflow Area=16.122 ac
2
Flow (cfs)
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 490 of 1174
Page 491
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 24
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.418 ac, 38.59% Impervious, Inflow Depth = 0.77" for 1-yr event
Inflow = 0.52 cfs @ 12.04 hrs, Volume= 0.027 af
Outflow = 0.01 cfs @ 17.73 hrs, Volume= 0.027 af, Atten= 98%, Lag= 341.1 min
Primary = 0.01 cfs @ 17.73 hrs, Volume= 0.027 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 598.47' @ 17.73 hrs Surf.Area= 874 sf Storage= 780 cf
Flood Elev= 600.00' Surf.Area= 2,203 sf Storage= 3,248 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 1,193.3 min ( 2,038.4 - 845.1 )
Volume Invert Avail.Storage Storage Description
#1 594.42' 3,248 cf Bioretention (Prismatic)Listed below (Recalc)
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
594.42 350 0.0 0 0
594.43 350 20.0 1 1
595.25 350 20.0 57 58
597.75 350 40.0 350 408
598.00 350 100.0 88 496
599.00 1,476 100.0 913 1,409
600.00 2,203 100.0 1,840 3,248
Device Routing Invert Outlet Devices
#1 Primary 594.42' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Page 491 of 1174
Page 492
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 25
Primary OutFlow Max=0.01 cfs @ 17.73 hrs HW=598.47' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.01 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=594.42' TW=0.00' (Dynamic Tailwater)
3=Culvert ( Controls 0.00 cfs)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=594.42' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Pond BIO-1: Filtration Bioretention
Hydrograph
Inflow
0.52 cfs Outflow
Inflow Area=0.418 ac Primary
Secondary
Tertiary
0.55 Peak Elev=598.47'
0.5 Storage=780 cf
0.45
0.4
0.35
Flow (cfs)
0.3
0.25
0.2
0.15
0.01 cfs
0.1 0.01 cfs
0.05 0.00 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 492 of 1174
Page 493
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 26
Summary for Pond BIO-1A: Filtration Bioretention
Inflow Area = 0.232 ac, 38.46% Impervious, Inflow Depth = 0.77" for 1-yr event
Inflow = 0.29 cfs @ 12.04 hrs, Volume= 0.015 af
Outflow = 0.00 cfs @ 11.29 hrs, Volume= 0.015 af, Atten= 99%, Lag= 0.0 min
Primary = 0.00 cfs @ 11.29 hrs, Volume= 0.015 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 597.88' @ 21.08 hrs Surf.Area= 350 sf Storage= 454 cf
Flood Elev= 600.00' Surf.Area= 2,203 sf Storage= 3,248 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 1,120.1 min ( 1,965.2 - 845.1 )
Volume Invert Avail.Storage Storage Description
#1 594.42' 3,248 cf Bioretention (Prismatic)Listed below (Recalc)
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
594.42 350 0.0 0 0
594.43 350 20.0 1 1
595.25 350 20.0 57 58
597.75 350 40.0 350 408
598.00 350 100.0 88 496
599.00 1,476 100.0 913 1,409
600.00 2,203 100.0 1,840 3,248
Device Routing Invert Outlet Devices
#1 Primary 594.42' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 6.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.20 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Page 493 of 1174
Page 494
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 27
Primary OutFlow Max=0.00 cfs @ 11.29 hrs HW=594.43' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.00 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=594.42' TW=0.00' (Dynamic Tailwater)
3=Culvert ( Controls 0.00 cfs)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=594.42' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Pond BIO-1A: Filtration Bioretention
Hydrograph
Inflow
0.29 cfs Outflow
Inflow Area=0.232 ac Primary
Secondary
0.32 Tertiary
0.3
Peak Elev=597.88'
0.28 Storage=454 cf
0.26
0.24
0.22
0.2
Flow (cfs)
0.18
0.16
0.14
0.12
0.1
0.08
0.00 cfs
0.06
0.00 cfs
0.04
0.00 cfs
0.02
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 494 of 1174
Page 495
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 28
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 0.72" for 1-yr event
Inflow = 0.74 cfs @ 12.04 hrs, Volume= 0.039 af
Outflow = 0.02 cfs @ 16.10 hrs, Volume= 0.039 af, Atten= 97%, Lag= 243.6 min
Primary = 0.02 cfs @ 16.10 hrs, Volume= 0.039 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.51' @ 16.10 hrs Surf.Area= 1,651 sf Storage= 1,048 cf
Flood Elev= 598.00' Surf.Area= 3,117 sf Storage= 4,754 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 972.2 min ( 1,821.9 - 849.7 )
Volume Invert Avail.Storage Storage Description
#1 592.42' 4,754 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
592.42 370 0.0 0 0
592.43 370 20.0 1 1
593.25 370 20.0 61 61
595.75 370 40.0 370 431
596.00 370 100.0 93 524
596.50 1,629 100.0 500 1,024
597.00 2,353 100.0 996 2,019
598.00 3,117 100.0 2,735 4,754
Device Routing Invert Outlet Devices
#1 Primary 592.42' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Page 495 of 1174
Page 496
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 29
Primary OutFlow Max=0.02 cfs @ 16.10 hrs HW=596.51' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=592.42' TW=0.00' (Dynamic Tailwater)
3=Culvert ( Controls 0.00 cfs)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=592.42' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Pond BIO-2: Filtration Bioretention
Hydrograph
Inflow
0.74 cfs Outflow
Inflow Area=0.649 ac Primary
Secondary
Tertiary
0.8 Peak Elev=596.51'
0.75
0.7 Storage=1,048 cf
0.65
0.6
0.55
0.5
Flow (cfs)
0.45
0.4
0.35
0.3
0.25
0.2
0.02 cfs
0.15 0.02 cfs
0.1
0.00 cfs
0.05
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 496 of 1174
Page 497
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 30
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.743 ac, 64.64% Impervious, Inflow Depth = 1.08" for 1-yr event
Inflow = 1.32 cfs @ 12.04 hrs, Volume= 0.067 af
Outflow = 0.03 cfs @ 15.20 hrs, Volume= 0.067 af, Atten= 98%, Lag= 189.6 min
Primary = 0.03 cfs @ 15.20 hrs, Volume= 0.067 af
Routed to Reach DP-1 : Design Point
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 595.48' @ 15.20 hrs Surf.Area= 2,839 sf Storage= 1,854 cf
Flood Elev= 597.00' Surf.Area= 4,176 sf Storage= 7,294 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 984.1 min ( 1,804.3 - 820.1 )
Volume Invert Avail.Storage Storage Description
#1 591.42' 12,099 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
591.42 705 0.0 0 0
591.43 705 20.0 1 1
592.25 705 20.0 116 117
594.75 705 40.0 705 822
595.00 705 100.0 176 998
595.50 2,913 100.0 905 1,903
596.00 3,433 100.0 1,587 3,489
597.00 4,176 100.0 3,805 7,294
598.00 5,434 100.0 4,805 12,099
Device Routing Invert Outlet Devices
#1 Primary 591.42' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Page 497 of 1174
Page 498
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 31
Primary OutFlow Max=0.03 cfs @ 15.20 hrs HW=595.48' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.03 cfs)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=591.42' TW=0.00' (Dynamic Tailwater)
3=Culvert ( Controls 0.00 cfs)
2=Overflow Grate ( Controls 0.00 cfs)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=591.42' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Pond BIO-3: Filtration Bioretention
Hydrograph
Inflow
1.32 cfs Outflow
Inflow Area=0.743 ac Primary
Secondary
Tertiary
Peak Elev=595.48'
Storage=1,854 cf
1
Flow (cfs)
0.03 cfs
0.03 cfs
0.00 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 498 of 1174
Page 499
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 32
Summary for Pond CH-1: Chambers
Inflow Area = 2.286 ac, 90.30% Impervious, Inflow Depth = 1.45" for 1-yr event
Inflow = 5.27 cfs @ 12.04 hrs, Volume= 0.276 af
Outflow = 0.38 cfs @ 12.72 hrs, Volume= 0.229 af, Atten= 93%, Lag= 41.0 min
Primary = 0.38 cfs @ 12.72 hrs, Volume= 0.229 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 592.21' @ 12.72 hrs Surf.Area= 6,598 sf Storage= 7,377 cf
Flood Elev= 598.32' Surf.Area= 13,198 sf Storage= 26,499 cf
Plug-Flow detention time= 341.3 min calculated for 0.229 af (83% of inflow)
Center-of-Mass det. time= 269.3 min ( 1,055.1 - 785.8 )
Volume Invert Avail.Storage Storage Description
#1A 590.50' 9,166 cf 44.25'W x 149.10'L x 5.50'H Field A
36,287 cf Overall - 13,373 cf Embedded = 22,914 cf x 40.0% Voids
#2A 591.25' 13,373 cf ADS_StormTech MC-3500 d +Cap x 120 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
120 Chambers in 6 Rows
Cap Storage= 14.9 cf x 2 x 6 rows = 178.8 cf
#3 596.00' 3,960 cf Custom Stage Data (Prismatic)Listed below (Recalc)
26,499 cf Total Available Storage
Storage Group A created with Chamber Wizard
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
596.00 6,600 0.0 0 0
597.50 6,600 40.0 3,960 3,960
Device Routing Invert Outlet Devices
#1 Primary 590.50' 8.0" Round Culvert
L= 120.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 590.50' / 589.25' S= 0.0104 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 1 591.25' 4.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads
#3 Device 1 594.35' 4.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s)
Primary OutFlow Max=0.38 cfs @ 12.72 hrs HW=592.21' TW=0.00' (Dynamic Tailwater)
1=Culvert (Passes 0.38 cfs of 1.47 cfs potential flow)
2=Orifice/Grate (Orifice Controls 0.38 cfs @ 4.30 fps)
3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 499 of 1174
Page 500
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 33
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 6 rows = 178.8 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
6 Rows x 77.0" Wide + 9.0" Spacing x 5 + 12.0" Side Stone x 2 = 44.25' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
120 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 6 Rows = 13,373.0 cf Chamber Storage
36,287.2 cf Field - 13,373.0 cf Chambers = 22,914.2 cf Stone x 40.0% Voids = 9,165.7 cf Stone Storage
Chamber Storage + Stone Storage = 22,538.7 cf = 0.517 af
Overall Storage Efficiency = 62.1%
Overall System Size = 149.10' x 44.25' x 5.50'
120 Chambers
1,344.0 cy Field
848.7 cy Stone
Page 500 of 1174
Page 501
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 1-yr Rainfall=1.82"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 34
Pond CH-1: Chambers
Hydrograph
Inflow
5.27 cfs Primary
Inflow Area=2.286 ac
5
Peak Elev=592.21'
4
Storage=7,377 cf
Flow (cfs)
3
2
1
0.38 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 501 of 1174
Page 502
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 35
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=18,210 sf 38.59% Impervious Runoff Depth=2.49"
Tc=6.0 min CN=87 Runoff=1.57 cfs 0.087 af
Subcatchment PS-1A: Runoff Area=10,120 sf 38.46% Impervious Runoff Depth=2.49"
Tc=6.0 min CN=87 Runoff=0.87 cfs 0.048 af
Subcatchment PS-2: Runoff Area=74,205 sf 86.99% Impervious Runoff Depth=3.38"
Tc=6.0 min CN=96 Runoff=8.11 cfs 0.480 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=2.40"
Tc=6.0 min CN=86 Runoff=2.35 cfs 0.130 af
Subcatchment PS-4: Runoff Area=32,374 sf 64.64% Impervious Runoff Depth=2.96"
Tc=6.0 min CN=92 Runoff=3.24 cfs 0.184 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=3.61"
Tc=6.0 min CN=98 Runoff=2.11 cfs 0.129 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=3.61"
Tc=6.0 min CN=98 Runoff=0.74 cfs 0.046 af
Subcatchment PS-7: Runoff Area=242,510 sf 0.00% Impervious Runoff Depth=1.91"
Flow Length=391' Tc=14.0 min CN=80 Runoff=11.45 cfs 0.886 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=1.91"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=1.91 cfs 0.195 af
Subcatchment PS-9: OFF-SITE DRAINAGE Runoff Area=217,757 sf 0.78% Impervious Runoff Depth=1.83"
Flow Length=857' Slope=0.0100 '/' Tc=59.4 min CN=79 Runoff=4.77 cfs 0.764 af
Reach 8R: 15" Pipe Avg. Flow Depth=0.93' Max Vel=5.84 fps Inflow=5.71 cfs 0.960 af
0" Round Pipe n=0.013 L=350.0' S=0.0096 '/' Capacity=6.33 cfs Outflow=5.70 cfs 0.960 af Overflow=0.00 cfs 0.000 af
Reach 9R: East Swale Avg. Flow Depth=0.50' Max Vel=3.29 fps Inflow=5.72 cfs 0.960 af
n=0.022 L=460.0' S=0.0101 '/' Capacity=303.17 cfs Outflow=5.71 cfs 0.960 af
Reach DP-1: Design Point Inflow=16.38 cfs 2.887 af
Outflow=16.38 cfs 2.887 af
Pond BIO-1: Filtration Bioretention Peak Elev=599.09' Storage=1,543 cf Inflow=1.57 cfs 0.087 af
Primary=0.02 cfs 0.048 af Secondary=0.69 cfs 0.036 af Tertiary=0.00 cfs 0.000 af Outflow=0.71 cfs 0.083 af
Pond BIO-1A: Filtration Bioretention Peak Elev=599.01' Storage=1,417 cf Inflow=0.87 cfs 0.048 af
Primary=0.02 cfs 0.044 af Secondary=0.01 cfs 0.001 af Tertiary=0.00 cfs 0.000 af Outflow=0.03 cfs 0.046 af
Pond BIO-2: Filtration Bioretention Peak Elev=597.11' Storage=2,288 cf Inflow=2.35 cfs 0.130 af
Primary=0.03 cfs 0.072 af Secondary=0.99 cfs 0.055 af Tertiary=0.00 cfs 0.000 af Outflow=1.01 cfs 0.126 af
Page 502 of 1174
Page 503
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 36
Pond BIO-3: Filtration Bioretention Peak Elev=596.11' Storage=3,881 cf Inflow=3.24 cfs 0.184 af
Primary=0.04 cfs 0.116 af Secondary=0.99 cfs 0.061 af Tertiary=0.00 cfs 0.000 af Outflow=1.03 cfs 0.177 af
Pond CH-1: Chambers Peak Elev=594.31' Storage=17,647 cf Inflow=10.97 cfs 0.655 af
Outflow=0.71 cfs 0.608 af
Total Runoff Area = 16.122 ac Runoff Volume = 2.949 af Average Runoff Depth = 2.20"
81.07% Pervious = 13.071 ac 18.93% Impervious = 3.052 ac
Page 503 of 1174
Page 504
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 37
Summary for Subcatchment PS-1:
Runoff = 1.57 cfs @ 12.04 hrs, Volume= 0.087 af, Depth= 2.49"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Area (sf) CN Description
7,027 98 Paved parking, HSG D
11,183 80 >75% Grass cover, Good, HSG D
18,210 87 Weighted Average
11,183 61.41% Pervious Area
7,027 38.59% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
Runoff
1.57 cfs
NY-West Seneca 24-hr S1 25-yr
Rainfall=3.84"
Runoff Area=18,210 sf
Runoff Volume=0.087 af
Runoff Depth=2.49"
Flow (cfs)
1
Tc=6.0 min
CN=87
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 504 of 1174
Page 505
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 38
Summary for Subcatchment PS-1A:
Runoff = 0.87 cfs @ 12.04 hrs, Volume= 0.048 af, Depth= 2.49"
Routed to Pond BIO-1A : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Area (sf) CN Description
3,892 98 Paved parking, HSG D
6,228 80 >75% Grass cover, Good, HSG D
10,120 87 Weighted Average
6,228 61.54% Pervious Area
3,892 38.46% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1A:
Hydrograph
0.95 Runoff
0.9 0.87 cfs
0.85 NY-West Seneca 24-hr S1 25-yr
0.8 Rainfall=3.84"
0.75
Runoff Area=10,120 sf
0.7
0.65 Runoff Volume=0.048 af
0.6 Runoff Depth=2.49"
Flow (cfs)
0.55
Tc=6.0 min
0.5
0.45 CN=87
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 505 of 1174
Page 506
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 39
Summary for Subcatchment PS-2:
Runoff = 8.11 cfs @ 12.04 hrs, Volume= 0.480 af, Depth= 3.38"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Area (sf) CN Description
64,548 98 Paved parking, HSG D
9,657 80 >75% Grass cover, Good, HSG D
74,205 96 Weighted Average
9,657 13.01% Pervious Area
64,548 86.99% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
9 Runoff
8.11 cfs
8 NY-West Seneca 24-hr S1 25-yr
Rainfall=3.84"
7
Runoff Area=74,205 sf
6
Runoff Volume=0.480 af
Runoff Depth=3.38"
Flow (cfs)
5 Tc=6.0 min
CN=96
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 506 of 1174
Page 507
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 40
Summary for Subcatchment PS-3:
Runoff = 2.35 cfs @ 12.04 hrs, Volume= 0.130 af, Depth= 2.40"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
Runoff
2.35 cfs
NY-West Seneca 24-hr S1 25-yr
Rainfall=3.84"
2 Runoff Area=28,267 sf
Runoff Volume=0.130 af
Runoff Depth=2.40"
Flow (cfs)
Tc=6.0 min
CN=86
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 507 of 1174
Page 508
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 41
Summary for Subcatchment PS-4:
Runoff = 3.24 cfs @ 12.04 hrs, Volume= 0.184 af, Depth= 2.96"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
11,446 80 >75% Grass cover, Good, HSG D
32,374 92 Weighted Average
11,446 35.36% Pervious Area
20,928 64.64% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
Runoff
3.24 cfs
NY-West Seneca 24-hr S1 25-yr
3 Rainfall=3.84"
Runoff Area=32,374 sf
Runoff Volume=0.184 af
Runoff Depth=2.96"
Flow (cfs)
2 Tc=6.0 min
CN=92
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 508 of 1174
Page 509
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 42
Summary for Subcatchment PS-5:
Runoff = 2.11 cfs @ 12.04 hrs, Volume= 0.129 af, Depth= 3.61"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
2.11 cfs
NY-West Seneca 24-hr S1 25-yr
2
Rainfall=3.84"
Runoff Area=18,756 sf
Runoff Volume=0.129 af
Runoff Depth=3.61"
Flow (cfs)
Tc=6.0 min
CN=98
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 509 of 1174
Page 510
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 43
Summary for Subcatchment PS-6:
Runoff = 0.74 cfs @ 12.04 hrs, Volume= 0.046 af, Depth= 3.61"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
0.8
0.74 cfs
0.75
NY-West Seneca 24-hr S1 25-yr
0.7
Rainfall=3.84"
0.65
Runoff Area=6,622 sf
0.6
0.55
Runoff Volume=0.046 af
0.5 Runoff Depth=3.61"
Flow (cfs)
0.45 Tc=6.0 min
0.4 CN=98
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 510 of 1174
Page 511
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 44
Summary for Subcatchment PS-7:
Runoff = 11.45 cfs @ 12.15 hrs, Volume= 0.886 af, Depth= 1.91"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Area (sf) CN Description
242,510 80 >75% Grass cover, Good, HSG D
242,510 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
Runoff
12 11.45 cfs
11
NY-West Seneca 24-hr S1 25-yr
Rainfall=3.84"
10
Runoff Area=242,510 sf
9
Runoff Volume=0.886 af
8 Runoff Depth=1.91"
Flow (cfs)
7 Flow Length=391'
6 Tc=14.0 min
5
CN=80
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 511 of 1174
Page 512
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 45
Summary for Subcatchment PS-8:
Runoff = 1.91 cfs @ 12.31 hrs, Volume= 0.195 af, Depth= 1.91"
Routed to Reach 9R : East Swale
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
Runoff
2 1.91 cfs
NY-West Seneca 24-hr S1 25-yr
Rainfall=3.84"
Runoff Area=53,474 sf
Runoff Volume=0.195 af
Runoff Depth=1.91"
Flow (cfs)
Flow Length=821'
1 Slope=0.0100 '/'
Tc=25.7 min
CN=80
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 512 of 1174
Page 513
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 46
Summary for Subcatchment PS-9: OFF-SITE DRAINAGE
Runoff = 4.77 cfs @ 12.80 hrs, Volume= 0.764 af, Depth= 1.83"
Routed to Reach 9R : East Swale
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Area (sf) CN Description
1,089 80 >75% Grass cover, Good, HSG D
1,699 98 Paved parking, HSG D
214,969 79 Woods, Fair, HSG D
217,757 79 Weighted Average
216,058 99.22% Pervious Area
1,699 0.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
20.0 600 0.0100 0.50 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
34.2 100 0.0100 0.05 Sheet Flow, 100'
Woods: Light underbrush n= 0.400 P2= 2.20"
5.2 157 0.0100 0.50 Shallow Concentrated Flow, Swale
Woodland Kv= 5.0 fps
59.4 857 Total
Subcatchment PS-9: OFF-SITE DRAINAGE
Hydrograph
Runoff
5 4.77 cfs
NY-West Seneca 24-hr S1 25-yr
Rainfall=3.84"
4 Runoff Area=217,757 sf
Runoff Volume=0.764 af
Runoff Depth=1.83"
Flow (cfs)
3
Flow Length=857'
Slope=0.0100 '/'
Tc=59.4 min
2
CN=79
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 513 of 1174
Page 514
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 47
Summary for Reach 8R: 15" Pipe
[52] Hint: Inlet/Outlet conditions not evaluated
Inflow Area = 6.227 ac, 0.63% Impervious, Inflow Depth = 1.85" for 25-yr event
Inflow = 5.71 cfs @ 12.75 hrs, Volume= 0.960 af
Outflow = 5.70 cfs @ 12.76 hrs, Volume= 0.960 af, Atten= 0%, Lag= 0.7 min
Routed to Reach DP-1 : Design Point
Overflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Max. Velocity= 5.84 fps, Min. Travel Time= 1.0 min
Avg. Velocity = 2.52 fps, Avg. Travel Time= 2.3 min
Peak Storage= 342 cf @ 12.76 hrs
Average Depth at Peak Storage= 0.93' , Surface Width= 1.09'
Defined Flood Depth= 598.00' Flow Area= 100.4 sf, Capacity= -12,672.78 cfs
Bank-Full Depth= 1.25' Flow Area= 1.2 sf, Capacity= 6.33 cfs
Any excess flow will be diverted to the secondary overflow
15.0" Round Pipe
n= 0.013 Corrugated PE, smooth interior
Length= 350.0' Slope= 0.0096 '/'
Inlet Invert= 591.85', Outlet Invert= 588.49'
Page 514 of 1174
Page 515
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 48
Reach 8R: 15" Pipe
Hydrograph
Inflow
5.71 cfs Outflow
Overflow
6
5.70 cfs
Inflow Area=6.227 ac
Avg. Flow Depth=0.93'
5 Max Vel=5.84 fps
15.0"
4 Round Pipe
Flow (cfs)
n=0.013
3
L=350.0'
S=0.0096 '/'
2
Capacity=6.33 cfs
1
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 515 of 1174
Page 516
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 49
Summary for Reach 9R: East Swale
Inflow Area = 6.227 ac, 0.63% Impervious, Inflow Depth = 1.85" for 25-yr event
Inflow = 5.72 cfs @ 12.73 hrs, Volume= 0.960 af
Outflow = 5.71 cfs @ 12.75 hrs, Volume= 0.960 af, Atten= 0%, Lag= 0.9 min
Routed to Reach 8R : 15" Pipe
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Max. Velocity= 3.29 fps, Min. Travel Time= 2.3 min
Avg. Velocity = 1.36 fps, Avg. Travel Time= 5.6 min
Peak Storage= 798 cf @ 12.75 hrs
Average Depth at Peak Storage= 0.50' , Surface Width= 4.98'
Bank-Full Depth= 3.00' Flow Area= 33.0 sf, Capacity= 303.17 cfs
2.00' x 3.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 3.0 '/' Top Width= 20.00'
Length= 460.0' Slope= 0.0101 '/'
Inlet Invert= 599.00', Outlet Invert= 594.35'
Reach 9R: East Swale
Hydrograph
Inflow
5.72 cfs Outflow
6 5.71 cfs
Inflow Area=6.227 ac
5
Avg. Flow Depth=0.50'
Max Vel=3.29 fps
4 n=0.022
Flow (cfs)
L=460.0'
3
S=0.0101 '/'
2
Capacity=303.17 cfs
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 516 of 1174
Page 517
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 50
Summary for Reach DP-1: Design Point
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 16.122 ac, 18.93% Impervious, Inflow Depth > 2.15" for 25-yr event
Inflow = 16.38 cfs @ 12.19 hrs, Volume= 2.887 af
Outflow = 16.38 cfs @ 12.19 hrs, Volume= 2.887 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
18 16.38 cfs Outflow
17
16
16.38 cfs
Inflow Area=16.122 ac
15
14
13
12
11
Flow (cfs)
10
9
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 517 of 1174
Page 518
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 51
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.418 ac, 38.59% Impervious, Inflow Depth = 2.49" for 25-yr event
Inflow = 1.57 cfs @ 12.04 hrs, Volume= 0.087 af
Outflow = 0.71 cfs @ 12.19 hrs, Volume= 0.083 af, Atten= 55%, Lag= 8.9 min
Primary = 0.02 cfs @ 12.19 hrs, Volume= 0.048 af
Routed to Reach DP-1 : Design Point
Secondary = 0.69 cfs @ 12.19 hrs, Volume= 0.036 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 599.09' @ 12.19 hrs Surf.Area= 1,541 sf Storage= 1,543 cf
Flood Elev= 600.00' Surf.Area= 2,203 sf Storage= 3,248 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 614.7 min ( 1,423.8 - 809.1 )
Volume Invert Avail.Storage Storage Description
#1 594.42' 3,248 cf Bioretention (Prismatic)Listed below (Recalc)
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
594.42 350 0.0 0 0
594.43 350 20.0 1 1
595.25 350 20.0 57 58
597.75 350 40.0 350 408
598.00 350 100.0 88 496
599.00 1,476 100.0 913 1,409
600.00 2,203 100.0 1,840 3,248
Device Routing Invert Outlet Devices
#1 Primary 594.42' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Page 518 of 1174
Page 519
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 52
Primary OutFlow Max=0.02 cfs @ 12.19 hrs HW=599.09' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=0.69 cfs @ 12.19 hrs HW=599.09' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.69 cfs of 5.98 cfs potential flow)
2=Overflow Grate (Weir Controls 0.69 cfs @ 0.98 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=594.42' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Pond BIO-1: Filtration Bioretention
Hydrograph
Inflow
1.57 cfs Outflow
Inflow Area=0.418 ac Primary
Secondary
Tertiary
Peak Elev=599.09'
Storage=1,543 cf
0.71 cfs
Flow (cfs)
1
0.69 cfs
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 519 of 1174
Page 520
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 53
Summary for Pond BIO-1A: Filtration Bioretention
Inflow Area = 0.232 ac, 38.46% Impervious, Inflow Depth = 2.49" for 25-yr event
Inflow = 0.87 cfs @ 12.04 hrs, Volume= 0.048 af
Outflow = 0.03 cfs @ 14.29 hrs, Volume= 0.046 af, Atten= 97%, Lag= 134.9 min
Primary = 0.02 cfs @ 14.29 hrs, Volume= 0.044 af
Routed to Reach DP-1 : Design Point
Secondary = 0.01 cfs @ 14.29 hrs, Volume= 0.001 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 599.01' @ 14.29 hrs Surf.Area= 1,480 sf Storage= 1,417 cf
Flood Elev= 600.00' Surf.Area= 2,203 sf Storage= 3,248 cf
Plug-Flow detention time= 1,094.7 min calculated for 0.046 af (95% of inflow)
Center-of-Mass det. time= 1,065.2 min ( 1,874.3 - 809.1 )
Volume Invert Avail.Storage Storage Description
#1 594.42' 3,248 cf Bioretention (Prismatic)Listed below (Recalc)
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
594.42 350 0.0 0 0
594.43 350 20.0 1 1
595.25 350 20.0 57 58
597.75 350 40.0 350 408
598.00 350 100.0 88 496
599.00 1,476 100.0 913 1,409
600.00 2,203 100.0 1,840 3,248
Device Routing Invert Outlet Devices
#1 Primary 594.42' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 6.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.20 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Page 520 of 1174
Page 521
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 54
Primary OutFlow Max=0.02 cfs @ 14.29 hrs HW=599.01' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=0.01 cfs @ 14.29 hrs HW=599.01' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.01 cfs of 1.53 cfs potential flow)
2=Overflow Grate (Weir Controls 0.01 cfs @ 0.25 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=594.42' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Pond BIO-1A: Filtration Bioretention
Hydrograph
Inflow
0.87 cfs Outflow
Inflow Area=0.232 ac Primary
Secondary
Tertiary
0.95
0.9
Peak Elev=599.01'
0.85
0.8
Storage=1,417 cf
0.75
0.7
0.65
0.6
Flow (cfs)
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.03 cfs
0.2
0.15 0.02 cfs
0.1 0.01 cfs
0.05
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 521 of 1174
Page 522
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 55
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 2.40" for 25-yr event
Inflow = 2.35 cfs @ 12.04 hrs, Volume= 0.130 af
Outflow = 1.01 cfs @ 12.20 hrs, Volume= 0.126 af, Atten= 57%, Lag= 9.7 min
Primary = 0.03 cfs @ 12.20 hrs, Volume= 0.072 af
Routed to Reach DP-1 : Design Point
Secondary = 0.99 cfs @ 12.20 hrs, Volume= 0.055 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 597.11' @ 12.20 hrs Surf.Area= 2,439 sf Storage= 2,288 cf
Flood Elev= 598.00' Surf.Area= 3,117 sf Storage= 4,754 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 552.4 min ( 1,364.9 - 812.4 )
Volume Invert Avail.Storage Storage Description
#1 592.42' 4,754 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
592.42 370 0.0 0 0
592.43 370 20.0 1 1
593.25 370 20.0 61 61
595.75 370 40.0 370 431
596.00 370 100.0 93 524
596.50 1,629 100.0 500 1,024
597.00 2,353 100.0 996 2,019
598.00 3,117 100.0 2,735 4,754
Device Routing Invert Outlet Devices
#1 Primary 592.42' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Page 522 of 1174
Page 523
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 56
Primary OutFlow Max=0.03 cfs @ 12.20 hrs HW=597.11' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.03 cfs)
Secondary OutFlow Max=0.99 cfs @ 12.20 hrs HW=597.11' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.99 cfs of 5.54 cfs potential flow)
2=Overflow Grate (Weir Controls 0.99 cfs @ 1.10 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=592.42' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Pond BIO-2: Filtration Bioretention
Hydrograph
Inflow
2.35 cfs Outflow
Inflow Area=0.649 ac Primary
Secondary
Tertiary
Peak Elev=597.11'
Storage=2,288 cf
2
Flow (cfs)
1.01 cfs
0.99 cfs
1
0.03 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 523 of 1174
Page 524
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 57
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.743 ac, 64.64% Impervious, Inflow Depth = 2.96" for 25-yr event
Inflow = 3.24 cfs @ 12.04 hrs, Volume= 0.184 af
Outflow = 1.03 cfs @ 12.28 hrs, Volume= 0.177 af, Atten= 68%, Lag= 14.3 min
Primary = 0.04 cfs @ 12.28 hrs, Volume= 0.116 af
Routed to Reach DP-1 : Design Point
Secondary = 0.99 cfs @ 12.28 hrs, Volume= 0.061 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.11' @ 12.28 hrs Surf.Area= 3,517 sf Storage= 3,881 cf
Flood Elev= 597.00' Surf.Area= 4,176 sf Storage= 7,294 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 695.6 min ( 1,485.5 - 790.0 )
Volume Invert Avail.Storage Storage Description
#1 591.42' 12,099 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
591.42 705 0.0 0 0
591.43 705 20.0 1 1
592.25 705 20.0 116 117
594.75 705 40.0 705 822
595.00 705 100.0 176 998
595.50 2,913 100.0 905 1,903
596.00 3,433 100.0 1,587 3,489
597.00 4,176 100.0 3,805 7,294
598.00 5,434 100.0 4,805 12,099
Device Routing Invert Outlet Devices
#1 Primary 591.42' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Page 524 of 1174
Page 525
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 58
Primary OutFlow Max=0.04 cfs @ 12.28 hrs HW=596.11' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=0.99 cfs @ 12.28 hrs HW=596.11' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.99 cfs of 6.00 cfs potential flow)
2=Overflow Grate (Weir Controls 0.99 cfs @ 1.10 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=591.42' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Pond BIO-3: Filtration Bioretention
Hydrograph
Inflow
3.24 cfs Outflow
Inflow Area=0.743 ac Primary
Secondary
Tertiary
Peak Elev=596.11'
3
Storage=3,881 cf
Flow (cfs)
2
1.03 cfs
0.99 cfs
1
0.04 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 525 of 1174
Page 526
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 59
Summary for Pond CH-1: Chambers
Inflow Area = 2.286 ac, 90.30% Impervious, Inflow Depth = 3.44" for 25-yr event
Inflow = 10.97 cfs @ 12.04 hrs, Volume= 0.655 af
Outflow = 0.71 cfs @ 12.82 hrs, Volume= 0.608 af, Atten= 93%, Lag= 47.0 min
Primary = 0.71 cfs @ 12.82 hrs, Volume= 0.608 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 594.31' @ 12.82 hrs Surf.Area= 6,598 sf Storage= 17,647 cf
Flood Elev= 598.32' Surf.Area= 13,198 sf Storage= 26,499 cf
Plug-Flow detention time= 360.4 min calculated for 0.608 af (93% of inflow)
Center-of-Mass det. time= 321.0 min ( 1,084.7 - 763.8 )
Volume Invert Avail.Storage Storage Description
#1A 590.50' 9,166 cf 44.25'W x 149.10'L x 5.50'H Field A
36,287 cf Overall - 13,373 cf Embedded = 22,914 cf x 40.0% Voids
#2A 591.25' 13,373 cf ADS_StormTech MC-3500 d +Cap x 120 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
120 Chambers in 6 Rows
Cap Storage= 14.9 cf x 2 x 6 rows = 178.8 cf
#3 596.00' 3,960 cf Custom Stage Data (Prismatic)Listed below (Recalc)
26,499 cf Total Available Storage
Storage Group A created with Chamber Wizard
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
596.00 6,600 0.0 0 0
597.50 6,600 40.0 3,960 3,960
Device Routing Invert Outlet Devices
#1 Primary 590.50' 8.0" Round Culvert
L= 120.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 590.50' / 589.25' S= 0.0104 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 1 591.25' 4.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads
#3 Device 1 594.35' 4.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s)
Primary OutFlow Max=0.71 cfs @ 12.82 hrs HW=594.31' TW=0.00' (Dynamic Tailwater)
1=Culvert (Passes 0.71 cfs of 2.03 cfs potential flow)
2=Orifice/Grate (Orifice Controls 0.71 cfs @ 8.19 fps)
3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 526 of 1174
Page 527
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 60
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 6 rows = 178.8 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
6 Rows x 77.0" Wide + 9.0" Spacing x 5 + 12.0" Side Stone x 2 = 44.25' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
120 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 6 Rows = 13,373.0 cf Chamber Storage
36,287.2 cf Field - 13,373.0 cf Chambers = 22,914.2 cf Stone x 40.0% Voids = 9,165.7 cf Stone Storage
Chamber Storage + Stone Storage = 22,538.7 cf = 0.517 af
Overall Storage Efficiency = 62.1%
Overall System Size = 149.10' x 44.25' x 5.50'
120 Chambers
1,344.0 cy Field
848.7 cy Stone
Page 527 of 1174
Page 528
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 25-yr Rainfall=3.84"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 61
Pond CH-1: Chambers
Hydrograph
Inflow
12 10.97 cfs Primary
11 Inflow Area=2.286 ac
10 Peak Elev=594.31'
9
Storage=17,647 cf
8
Flow (cfs)
7
6
5
4
3
2
0.71 cfs
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 528 of 1174
Page 529
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 62
Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment PS-1: Runoff Area=18,210 sf 38.59% Impervious Runoff Depth=3.77"
Tc=6.0 min CN=87 Runoff=2.32 cfs 0.132 af
Subcatchment PS-1A: Runoff Area=10,120 sf 38.46% Impervious Runoff Depth=3.77"
Tc=6.0 min CN=87 Runoff=1.29 cfs 0.073 af
Subcatchment PS-2: Runoff Area=74,205 sf 86.99% Impervious Runoff Depth=4.75"
Tc=6.0 min CN=96 Runoff=11.08 cfs 0.674 af
Subcatchment PS-3: Runoff Area=28,267 sf 33.49% Impervious Runoff Depth=3.67"
Tc=6.0 min CN=86 Runoff=3.52 cfs 0.199 af
Subcatchment PS-4: Runoff Area=32,374 sf 64.64% Impervious Runoff Depth=4.30"
Tc=6.0 min CN=92 Runoff=4.57 cfs 0.267 af
Subcatchment PS-5: Runoff Area=18,756 sf 100.00% Impervious Runoff Depth=4.98"
Tc=6.0 min CN=98 Runoff=2.85 cfs 0.179 af
Subcatchment PS-6: Runoff Area=6,622 sf 100.00% Impervious Runoff Depth=4.98"
Tc=6.0 min CN=98 Runoff=1.01 cfs 0.063 af
Subcatchment PS-7: Runoff Area=242,510 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=391' Tc=14.0 min CN=80 Runoff=18.68 cfs 1.432 af
Subcatchment PS-8: Runoff Area=53,474 sf 0.00% Impervious Runoff Depth=3.09"
Flow Length=821' Slope=0.0100 '/' Tc=25.7 min CN=80 Runoff=3.15 cfs 0.316 af
Subcatchment PS-9: OFF-SITE DRAINAGE Runoff Area=217,757 sf 0.78% Impervious Runoff Depth=2.99"
Flow Length=857' Slope=0.0100 '/' Tc=59.4 min CN=79 Runoff=8.05 cfs 1.246 af
Reach 8R: 15" Pipe Avg. Flow Depth=1.02' Max Vel=5.88 fps Inflow=9.63 cfs 1.562 af
0" Round Pipe n=0.013 L=350.0' S=0.0096 '/' Capacity=6.33 cfs Outflow=6.33 cfs 1.405 af Overflow=3.30 cfs 0.157 af
Reach 9R: East Swale Avg. Flow Depth=0.64' Max Vel=3.79 fps Inflow=9.64 cfs 1.562 af
n=0.022 L=460.0' S=0.0101 '/' Capacity=303.17 cfs Outflow=9.63 cfs 1.562 af
Reach DP-1: Design Point Inflow=31.21 cfs 4.516 af
Outflow=31.21 cfs 4.516 af
Pond BIO-1: Filtration Bioretention Peak Elev=599.18' Storage=1,692 cf Inflow=2.32 cfs 0.132 af
Primary=0.02 cfs 0.049 af Secondary=2.06 cfs 0.080 af Tertiary=0.00 cfs 0.000 af Outflow=2.08 cfs 0.128 af
Pond BIO-1A: Filtration Bioretention Peak Elev=599.07' Storage=1,508 cf Inflow=1.29 cfs 0.073 af
Primary=0.02 cfs 0.047 af Secondary=0.45 cfs 0.023 af Tertiary=0.00 cfs 0.000 af Outflow=0.46 cfs 0.070 af
Pond BIO-2: Filtration Bioretention Peak Elev=597.23' Storage=2,585 cf Inflow=3.52 cfs 0.199 af
Primary=0.03 cfs 0.073 af Secondary=2.92 cfs 0.122 af Tertiary=0.00 cfs 0.000 af Outflow=2.95 cfs 0.195 af
Page 529 of 1174
Page 530
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 63
Pond BIO-3: Filtration Bioretention Peak Elev=596.25' Storage=4,357 cf Inflow=4.57 cfs 0.267 af
Primary=0.04 cfs 0.120 af Secondary=3.20 cfs 0.140 af Tertiary=0.00 cfs 0.000 af Outflow=3.24 cfs 0.260 af
Pond CH-1: Chambers Peak Elev=595.88' Storage=22,228 cf Inflow=14.93 cfs 0.916 af
Outflow=2.37 cfs 0.869 af
Total Runoff Area = 16.122 ac Runoff Volume = 4.580 af Average Runoff Depth = 3.41"
81.07% Pervious = 13.071 ac 18.93% Impervious = 3.052 ac
Page 530 of 1174
Page 531
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 64
Summary for Subcatchment PS-1:
Runoff = 2.32 cfs @ 12.04 hrs, Volume= 0.132 af, Depth= 3.77"
Routed to Pond BIO-1 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
7,027 98 Paved parking, HSG D
11,183 80 >75% Grass cover, Good, HSG D
18,210 87 Weighted Average
11,183 61.41% Pervious Area
7,027 38.59% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1:
Hydrograph
Runoff
2.32 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
2 Runoff Area=18,210 sf
Runoff Volume=0.132 af
Runoff Depth=3.77"
Tc=6.0 min
Flow (cfs)
CN=87
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 531 of 1174
Page 532
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 65
Summary for Subcatchment PS-1A:
Runoff = 1.29 cfs @ 12.04 hrs, Volume= 0.073 af, Depth= 3.77"
Routed to Pond BIO-1A : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
3,892 98 Paved parking, HSG D
6,228 80 >75% Grass cover, Good, HSG D
10,120 87 Weighted Average
6,228 61.54% Pervious Area
3,892 38.46% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-1A:
Hydrograph
Runoff
1.29 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
Runoff Area=10,120 sf
1 Runoff Volume=0.073 af
Runoff Depth=3.77"
Tc=6.0 min
Flow (cfs)
CN=87
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 532 of 1174
Page 533
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 66
Summary for Subcatchment PS-2:
Runoff = 11.08 cfs @ 12.04 hrs, Volume= 0.674 af, Depth= 4.75"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
64,548 98 Paved parking, HSG D
9,657 80 >75% Grass cover, Good, HSG D
74,205 96 Weighted Average
9,657 13.01% Pervious Area
64,548 86.99% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-2:
Hydrograph
12 Runoff
11.08 cfs
11 NY-West Seneca 24-hr S1 100-yr
10 Rainfall=5.22"
Runoff Area=74,205 sf
9
Runoff Volume=0.674 af
8
Runoff Depth=4.75"
Tc=6.0 min
Flow (cfs)
7
6 CN=96
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 533 of 1174
Page 534
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 67
Summary for Subcatchment PS-3:
Runoff = 3.52 cfs @ 12.04 hrs, Volume= 0.199 af, Depth= 3.67"
Routed to Pond BIO-2 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
9,466 98 Paved parking, HSG D
18,801 80 >75% Grass cover, Good, HSG D
28,267 86 Weighted Average
18,801 66.51% Pervious Area
9,466 33.49% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-3:
Hydrograph
Runoff
3.52 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
3 Runoff Area=28,267 sf
Runoff Volume=0.199 af
Runoff Depth=3.67"
Tc=6.0 min
Flow (cfs)
2 CN=86
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 534 of 1174
Page 535
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 68
Summary for Subcatchment PS-4:
Runoff = 4.57 cfs @ 12.04 hrs, Volume= 0.267 af, Depth= 4.30"
Routed to Pond BIO-3 : Filtration Bioretention
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
20,928 98 Paved parking, HSG D
11,446 80 >75% Grass cover, Good, HSG D
32,374 92 Weighted Average
11,446 35.36% Pervious Area
20,928 64.64% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-4:
Hydrograph
5 Runoff
4.57 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
4
Runoff Area=32,374 sf
Runoff Volume=0.267 af
Runoff Depth=4.30"
3
Tc=6.0 min
Flow (cfs)
CN=92
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 535 of 1174
Page 536
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 69
Summary for Subcatchment PS-5:
Runoff = 2.85 cfs @ 12.04 hrs, Volume= 0.179 af, Depth= 4.98"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
18,756 98 Paved parking, HSG D
18,756 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-5:
Hydrograph
Runoff
3 2.85 cfs
NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
Runoff Area=18,756 sf
Runoff Volume=0.179 af
2 Runoff Depth=4.98"
Tc=6.0 min
Flow (cfs)
CN=98
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 536 of 1174
Page 537
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 70
Summary for Subcatchment PS-6:
Runoff = 1.01 cfs @ 12.04 hrs, Volume= 0.063 af, Depth= 4.98"
Routed to Pond CH-1 : Chambers
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
6,622 98 Paved parking, HSG D
6,622 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Direct
Subcatchment PS-6:
Hydrograph
Runoff
1.01 cfs
1 NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
Runoff Area=6,622 sf
Runoff Volume=0.063 af
Runoff Depth=4.98"
Tc=6.0 min
Flow (cfs)
CN=98
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 537 of 1174
Page 538
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 71
Summary for Subcatchment PS-7:
Runoff = 18.68 cfs @ 12.15 hrs, Volume= 1.432 af, Depth= 3.09"
Routed to Reach DP-1 : Design Point
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
242,510 80 >75% Grass cover, Good, HSG D
242,510 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
8.5 100 0.0450 0.20 Sheet Flow,
Grass: Short n= 0.150 P2= 2.20"
5.3 271 0.0148 0.85 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
0.2 20 0.1500 1.94 Shallow Concentrated Flow, SCF
Woodland Kv= 5.0 fps
14.0 391 Total
Subcatchment PS-7:
Hydrograph
Runoff
20
18.68 cfs
19
18
NY-West Seneca 24-hr S1 100-yr
17 Rainfall=5.22"
16 Runoff Area=242,510 sf
15
14
Runoff Volume=1.432 af
13 Runoff Depth=3.09"
12 Flow Length=391'
Flow (cfs)
11
10
Tc=14.0 min
9 CN=80
8
7
6
5
4
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 538 of 1174
Page 539
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 72
Summary for Subcatchment PS-8:
Runoff = 3.15 cfs @ 12.31 hrs, Volume= 0.316 af, Depth= 3.09"
Routed to Reach 9R : East Swale
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
53,474 80 >75% Grass cover, Good, HSG D
53,474 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
15.6 100 0.0100 0.11 Sheet Flow, SF
Grass: Short n= 0.150 P2= 2.20"
8.8 371 0.0100 0.70 Shallow Concentrated Flow, SCF
Short Grass Pasture Kv= 7.0 fps
1.3 350 0.0100 4.54 3.56 Pipe Channel, Pipe Flow
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
25.7 821 Total
Subcatchment PS-8:
Hydrograph
Runoff
3.15 cfs
NY-West Seneca 24-hr S1 100-yr
3
Rainfall=5.22"
Runoff Area=53,474 sf
Runoff Volume=0.316 af
Runoff Depth=3.09"
Flow Length=821'
Flow (cfs)
2
Slope=0.0100 '/'
Tc=25.7 min
CN=80
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 539 of 1174
Page 540
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 73
Summary for Subcatchment PS-9: OFF-SITE DRAINAGE
Runoff = 8.05 cfs @ 12.80 hrs, Volume= 1.246 af, Depth= 2.99"
Routed to Reach 9R : East Swale
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Area (sf) CN Description
1,089 80 >75% Grass cover, Good, HSG D
1,699 98 Paved parking, HSG D
214,969 79 Woods, Fair, HSG D
217,757 79 Weighted Average
216,058 99.22% Pervious Area
1,699 0.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
20.0 600 0.0100 0.50 Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
34.2 100 0.0100 0.05 Sheet Flow, 100'
Woods: Light underbrush n= 0.400 P2= 2.20"
5.2 157 0.0100 0.50 Shallow Concentrated Flow, Swale
Woodland Kv= 5.0 fps
59.4 857 Total
Subcatchment PS-9: OFF-SITE DRAINAGE
Hydrograph
9
Runoff
8.05 cfs
8 NY-West Seneca 24-hr S1 100-yr
Rainfall=5.22"
7
Runoff Area=217,757 sf
6
Runoff Volume=1.246 af
Runoff Depth=2.99"
Flow Length=857'
Flow (cfs)
5
Slope=0.0100 '/'
4 Tc=59.4 min
CN=79
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 540 of 1174
Page 541
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 74
Summary for Reach 8R: 15" Pipe
[52] Hint: Inlet/Outlet conditions not evaluated
Inflow Area = 6.227 ac, 0.63% Impervious, Inflow Depth = 3.01" for 100-yr event
Inflow = 9.63 cfs @ 12.74 hrs, Volume= 1.562 af
Outflow = 6.33 cfs @ 12.83 hrs, Volume= 1.405 af, Atten= 34%, Lag= 5.6 min
Routed to Reach DP-1 : Design Point
Overflow = 3.30 cfs @ 12.74 hrs, Volume= 0.157 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Max. Velocity= 5.88 fps, Min. Travel Time= 1.0 min
Avg. Velocity = 2.74 fps, Avg. Travel Time= 2.1 min
Peak Storage= 377 cf @ 12.83 hrs
Average Depth at Peak Storage= 1.02' , Surface Width= 0.96'
Defined Flood Depth= 598.00' Flow Area= 100.4 sf, Capacity= -12,672.78 cfs
Bank-Full Depth= 1.25' Flow Area= 1.2 sf, Capacity= 6.33 cfs
Any excess flow will be diverted to the secondary overflow
15.0" Round Pipe
n= 0.013 Corrugated PE, smooth interior
Length= 350.0' Slope= 0.0096 '/'
Inlet Invert= 591.85', Outlet Invert= 588.49'
Page 541 of 1174
Page 542
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 75
Reach 8R: 15" Pipe
Hydrograph
Inflow
9.63 cfs Outflow
Overflow
10
Inflow Area=6.227 ac
Avg. Flow Depth=1.02'
9
Max Vel=5.88 fps
8
6.33 cfs
15.0"
7
Round Pipe
Flow (cfs)
6
n=0.013
5
L=350.0'
4
3.30 cfs S=0.0096 '/'
3 Capacity=6.33 cfs
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 542 of 1174
Page 543
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 76
Summary for Reach 9R: East Swale
Inflow Area = 6.227 ac, 0.63% Impervious, Inflow Depth = 3.01" for 100-yr event
Inflow = 9.64 cfs @ 12.73 hrs, Volume= 1.562 af
Outflow = 9.63 cfs @ 12.74 hrs, Volume= 1.562 af, Atten= 0%, Lag= 0.4 min
Routed to Reach 8R : 15" Pipe
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Max. Velocity= 3.79 fps, Min. Travel Time= 2.0 min
Avg. Velocity = 1.50 fps, Avg. Travel Time= 5.1 min
Peak Storage= 1,167 cf @ 12.74 hrs
Average Depth at Peak Storage= 0.64' , Surface Width= 5.87'
Bank-Full Depth= 3.00' Flow Area= 33.0 sf, Capacity= 303.17 cfs
2.00' x 3.00' deep channel, n= 0.022 Earth, clean & straight
Side Slope Z-value= 3.0 '/' Top Width= 20.00'
Length= 460.0' Slope= 0.0101 '/'
Inlet Invert= 599.00', Outlet Invert= 594.35'
Reach 9R: East Swale
Hydrograph
Inflow
9.64 cfs Outflow
10 9.63 cfs
Inflow Area=6.227 ac
9
Avg. Flow Depth=0.64'
8
Max Vel=3.79 fps
7
n=0.022
Flow (cfs)
6
L=460.0'
5
S=0.0101 '/'
4
Capacity=303.17 cfs
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 543 of 1174
Page 544
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 77
Summary for Reach DP-1: Design Point
[40] Hint: Not Described (Outflow=Inflow)
Inflow Area = 16.122 ac, 18.93% Impervious, Inflow Depth > 3.36" for 100-yr event
Inflow = 31.21 cfs @ 12.15 hrs, Volume= 4.516 af
Outflow = 31.21 cfs @ 12.15 hrs, Volume= 4.516 af, Atten= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Reach DP-1: Design Point
Hydrograph
Inflow
34 31.21 cfs Outflow
32
31.21 cfs
Inflow Area=16.122 ac
30
28
26
24
22
Flow (cfs)
20
18
16
14
12
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 544 of 1174
Page 545
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 78
Summary for Pond BIO-1: Filtration Bioretention
Inflow Area = 0.418 ac, 38.59% Impervious, Inflow Depth = 3.77" for 100-yr event
Inflow = 2.32 cfs @ 12.04 hrs, Volume= 0.132 af
Outflow = 2.08 cfs @ 12.07 hrs, Volume= 0.128 af, Atten= 10%, Lag= 1.9 min
Primary = 0.02 cfs @ 12.07 hrs, Volume= 0.049 af
Routed to Reach DP-1 : Design Point
Secondary = 2.06 cfs @ 12.07 hrs, Volume= 0.080 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 599.18' @ 12.07 hrs Surf.Area= 1,610 sf Storage= 1,692 cf
Flood Elev= 600.00' Surf.Area= 2,203 sf Storage= 3,248 cf
Plug-Flow detention time= 424.1 min calculated for 0.128 af (97% of inflow)
Center-of-Mass det. time= 408.9 min ( 1,204.9 - 796.0 )
Volume Invert Avail.Storage Storage Description
#1 594.42' 3,248 cf Bioretention (Prismatic)Listed below (Recalc)
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
594.42 350 0.0 0 0
594.43 350 20.0 1 1
595.25 350 20.0 57 58
597.75 350 40.0 350 408
598.00 350 100.0 88 496
599.00 1,476 100.0 913 1,409
600.00 2,203 100.0 1,840 3,248
Device Routing Invert Outlet Devices
#1 Primary 594.42' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 12.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Page 545 of 1174
Page 546
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 79
Primary OutFlow Max=0.02 cfs @ 12.07 hrs HW=599.18' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=2.06 cfs @ 12.07 hrs HW=599.18' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 2.06 cfs of 6.05 cfs potential flow)
2=Overflow Grate (Weir Controls 2.06 cfs @ 1.40 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=594.42' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Pond BIO-1: Filtration Bioretention
Hydrograph
Inflow
2.32 cfs Outflow
Inflow Area=0.418 ac Primary
Secondary
Tertiary
2.08 cfs
Peak Elev=599.18'
2.06 cfs
Storage=1,692 cf
2
Flow (cfs)
1
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 546 of 1174
Page 547
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 80
Summary for Pond BIO-1A: Filtration Bioretention
Inflow Area = 0.232 ac, 38.46% Impervious, Inflow Depth = 3.77" for 100-yr event
Inflow = 1.29 cfs @ 12.04 hrs, Volume= 0.073 af
Outflow = 0.46 cfs @ 12.26 hrs, Volume= 0.070 af, Atten= 64%, Lag= 13.6 min
Primary = 0.02 cfs @ 12.26 hrs, Volume= 0.047 af
Routed to Reach DP-1 : Design Point
Secondary = 0.45 cfs @ 12.26 hrs, Volume= 0.023 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 599.07' @ 12.26 hrs Surf.Area= 1,524 sf Storage= 1,508 cf
Flood Elev= 600.00' Surf.Area= 2,203 sf Storage= 3,248 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 721.2 min ( 1,517.1 - 796.0 )
Volume Invert Avail.Storage Storage Description
#1 594.42' 3,248 cf Bioretention (Prismatic)Listed below (Recalc)
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
594.42 350 0.0 0 0
594.43 350 20.0 1 1
595.25 350 20.0 57 58
597.75 350 40.0 350 408
598.00 350 100.0 88 496
599.00 1,476 100.0 913 1,409
600.00 2,203 100.0 1,840 3,248
Device Routing Invert Outlet Devices
#1 Primary 594.42' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 599.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 594.58' 6.0" Round Culvert
L= 25.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 594.58' / 594.33' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.20 sf
#4 Tertiary 599.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Page 547 of 1174
Page 548
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 81
Primary OutFlow Max=0.02 cfs @ 12.26 hrs HW=599.07' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.02 cfs)
Secondary OutFlow Max=0.44 cfs @ 12.26 hrs HW=599.07' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 0.44 cfs of 1.54 cfs potential flow)
2=Overflow Grate (Weir Controls 0.44 cfs @ 0.84 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=594.42' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Pond BIO-1A: Filtration Bioretention
Hydrograph
Inflow
1.29 cfs Outflow
Inflow Area=0.232 ac Primary
Secondary
Tertiary
Peak Elev=599.07'
Storage=1,508 cf
1
Flow (cfs)
0.46 cfs
0.45 cfs
0.02 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 548 of 1174
Page 549
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 82
Summary for Pond BIO-2: Filtration Bioretention
Inflow Area = 0.649 ac, 33.49% Impervious, Inflow Depth = 3.67" for 100-yr event
Inflow = 3.52 cfs @ 12.04 hrs, Volume= 0.199 af
Outflow = 2.95 cfs @ 12.08 hrs, Volume= 0.195 af, Atten= 16%, Lag= 2.5 min
Primary = 0.03 cfs @ 12.08 hrs, Volume= 0.073 af
Routed to Reach DP-1 : Design Point
Secondary = 2.92 cfs @ 12.08 hrs, Volume= 0.122 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 597.23' @ 12.08 hrs Surf.Area= 2,530 sf Storage= 2,585 cf
Flood Elev= 598.00' Surf.Area= 3,117 sf Storage= 4,754 cf
Plug-Flow detention time= 379.4 min calculated for 0.195 af (98% of inflow)
Center-of-Mass det. time= 368.3 min ( 1,167.1 - 798.9 )
Volume Invert Avail.Storage Storage Description
#1 592.42' 4,754 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
592.42 370 0.0 0 0
592.43 370 20.0 1 1
593.25 370 20.0 61 61
595.75 370 40.0 370 431
596.00 370 100.0 93 524
596.50 1,629 100.0 500 1,024
597.00 2,353 100.0 996 2,019
598.00 3,117 100.0 2,735 4,754
Device Routing Invert Outlet Devices
#1 Primary 592.42' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 597.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 592.58' 12.0" Round Culvert
L= 132.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 592.58' / 591.92' S= 0.0050 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 597.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Page 549 of 1174
Page 550
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 83
Primary OutFlow Max=0.03 cfs @ 12.08 hrs HW=597.23' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.03 cfs)
Secondary OutFlow Max=2.92 cfs @ 12.08 hrs HW=597.23' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 2.92 cfs of 5.62 cfs potential flow)
2=Overflow Grate (Weir Controls 2.92 cfs @ 1.57 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=592.42' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Pond BIO-2: Filtration Bioretention
Hydrograph
Inflow
3.52 cfs Outflow
Inflow Area=0.649 ac Primary
Secondary
Tertiary
2.95 cfs
Peak Elev=597.23'
2.92 cfs
Storage=2,585 cf
3
Flow (cfs)
2
1
0.03 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 550 of 1174
Page 551
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 84
Summary for Pond BIO-3: Filtration Bioretention
Inflow Area = 0.743 ac, 64.64% Impervious, Inflow Depth = 4.30" for 100-yr event
Inflow = 4.57 cfs @ 12.04 hrs, Volume= 0.267 af
Outflow = 3.24 cfs @ 12.10 hrs, Volume= 0.260 af, Atten= 29%, Lag= 3.9 min
Primary = 0.04 cfs @ 12.10 hrs, Volume= 0.120 af
Routed to Reach DP-1 : Design Point
Secondary = 3.20 cfs @ 12.10 hrs, Volume= 0.140 af
Routed to Reach DP-1 : Design Point
Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 596.25' @ 12.10 hrs Surf.Area= 3,616 sf Storage= 4,357 cf
Flood Elev= 597.00' Surf.Area= 4,176 sf Storage= 7,294 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 492.4 min ( 1,271.4 - 779.0 )
Volume Invert Avail.Storage Storage Description
#1 591.42' 12,099 cf Above Mulch Surface (Prismatic)Listed below (Recalc)
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
591.42 705 0.0 0 0
591.43 705 20.0 1 1
592.25 705 20.0 116 117
594.75 705 40.0 705 822
595.00 705 100.0 176 998
595.50 2,913 100.0 905 1,903
596.00 3,433 100.0 1,587 3,489
597.00 4,176 100.0 3,805 7,294
598.00 5,434 100.0 4,805 12,099
Device Routing Invert Outlet Devices
#1 Primary 591.42' 0.500 in/hr Exfiltration Through Media over Surface area
#2 Device 3 596.00' 24.0" x 24.0" Horiz. Overflow Grate C= 0.600
Limited to weir flow at low heads
#3 Secondary 591.58' 12.0" Round Culvert
L= 28.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 591.58' / 591.30' S= 0.0100 '/' Cc= 0.900
n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf
#4 Tertiary 596.50' 10.0' long x 3.0' breadth Emergency Overflow Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50
Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68
2.72 2.81 2.92 2.97 3.07 3.32
Page 551 of 1174
Page 552
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 85
Primary OutFlow Max=0.04 cfs @ 12.10 hrs HW=596.25' TW=0.00' (Dynamic Tailwater)
1=Exfiltration Through Media (Exfiltration Controls 0.04 cfs)
Secondary OutFlow Max=3.19 cfs @ 12.10 hrs HW=596.25' TW=0.00' (Dynamic Tailwater)
3=Culvert (Passes 3.19 cfs of 6.09 cfs potential flow)
2=Overflow Grate (Weir Controls 3.19 cfs @ 1.62 fps)
Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=591.42' TW=0.00' (Dynamic Tailwater)
4=Emergency Overflow Weir ( Controls 0.00 cfs)
Pond BIO-3: Filtration Bioretention
Hydrograph
Inflow
4.57 cfs Outflow
Inflow Area=0.743 ac Primary
Secondary
Tertiary
5 Peak Elev=596.25'
3.24 cfs
Storage=4,357 cf
4
3.20 cfs
3
Flow (cfs)
2
1
0.04 cfs
0.00 cfs
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 552 of 1174
Page 553
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 86
Summary for Pond CH-1: Chambers
Inflow Area = 2.286 ac, 90.30% Impervious, Inflow Depth = 4.81" for 100-yr event
Inflow = 14.93 cfs @ 12.04 hrs, Volume= 0.916 af
Outflow = 2.37 cfs @ 12.58 hrs, Volume= 0.869 af, Atten= 84%, Lag= 32.5 min
Primary = 2.37 cfs @ 12.58 hrs, Volume= 0.869 af
Routed to Reach DP-1 : Design Point
Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 595.88' @ 12.58 hrs Surf.Area= 6,598 sf Storage= 22,228 cf
Flood Elev= 598.32' Surf.Area= 13,198 sf Storage= 26,499 cf
Plug-Flow detention time= 299.4 min calculated for 0.869 af (95% of inflow)
Center-of-Mass det. time= 269.4 min ( 1,025.7 - 756.3 )
Volume Invert Avail.Storage Storage Description
#1A 590.50' 9,166 cf 44.25'W x 149.10'L x 5.50'H Field A
36,287 cf Overall - 13,373 cf Embedded = 22,914 cf x 40.0% Voids
#2A 591.25' 13,373 cf ADS_StormTech MC-3500 d +Cap x 120 Inside #1
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
120 Chambers in 6 Rows
Cap Storage= 14.9 cf x 2 x 6 rows = 178.8 cf
#3 596.00' 3,960 cf Custom Stage Data (Prismatic)Listed below (Recalc)
26,499 cf Total Available Storage
Storage Group A created with Chamber Wizard
Elevation Surf.Area Voids Inc.Store Cum.Store
(feet) (sq-ft) (%) (cubic-feet) (cubic-feet)
596.00 6,600 0.0 0 0
597.50 6,600 40.0 3,960 3,960
Device Routing Invert Outlet Devices
#1 Primary 590.50' 8.0" Round Culvert
L= 120.0' CPP, projecting, no headwall, Ke= 0.900
Inlet / Outlet Invert= 590.50' / 589.25' S= 0.0104 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf
#2 Device 1 591.25' 4.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads
#3 Device 1 594.35' 4.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s)
Primary OutFlow Max=2.37 cfs @ 12.58 hrs HW=595.88' TW=0.00' (Dynamic Tailwater)
1=Culvert (Barrel Controls 2.37 cfs @ 6.78 fps)
2=Orifice/Grate (Passes < 0.89 cfs potential flow)
3=Sharp-Crested Rectangular Weir (Passes < 22.91 cfs potential flow)
Page 553 of 1174
Page 554
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 87
Pond CH-1: Chambers - Chamber Wizard Field A
Chamber Model = ADS_StormTechMC-3500 d +Cap (ADS StormTech® MC-3500 d rev 03/14 with Cap
volume)
Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf
Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap
Cap Storage= 14.9 cf x 2 x 6 rows = 178.8 cf
77.0" Wide + 9.0" Spacing = 86.0" C-C Row Spacing
20 Chambers/Row x 7.17' Long +1.85' Cap Length x 2 = 147.10' Row Length +12.0" End Stone x 2 =
149.10' Base Length
6 Rows x 77.0" Wide + 9.0" Spacing x 5 + 12.0" Side Stone x 2 = 44.25' Base Width
9.0" Stone Base + 45.0" Chamber Height + 12.0" Stone Cover = 5.50' Field Height
120 Chambers x 110.0 cf + 14.9 cf Cap Volume x 2 x 6 Rows = 13,373.0 cf Chamber Storage
36,287.2 cf Field - 13,373.0 cf Chambers = 22,914.2 cf Stone x 40.0% Voids = 9,165.7 cf Stone Storage
Chamber Storage + Stone Storage = 22,538.7 cf = 0.517 af
Overall Storage Efficiency = 62.1%
Overall System Size = 149.10' x 44.25' x 5.50'
120 Chambers
1,344.0 cy Field
848.7 cy Stone
Page 554 of 1174
Page 555
WEST SENECA - POST DEVELOPMENT
E_App E_Post-Development Model_REV 2 NY-West Seneca 24-hr S1 100-yr Rainfall=5.22"
Prepared by Labella Associates Printed 7/26/2026
HydroCAD® 10.20-6a s/n 09581 © 2024 HydroCAD Software Solutions LLC Page 88
Pond CH-1: Chambers
Hydrograph
Inflow
14.93 cfs Primary
16
15 Inflow Area=2.286 ac
14
13
Peak Elev=595.88'
12
Storage=22,228 cf
11
10
Flow (cfs)
9
8
7
6
5
4
3 2.37 cfs
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
Page 555 of 1174
Page 556
Page 556 of 1174
Page 557
Appendix f:
Swppp inspection report
(sample form)
Page 557 of 1174
Page 558
Page 558 of 1174
Page 559
Prepared by:
LaBella Associates
Choose an item.
Choose an item.
Choose an item.
SWPPP INSPECTION REPORT NUMBER XX
CLIENT NAME
PROJECT NAME
PROJECT ADDRESS, TOWN OF X, X COUNTY, NY
PERMIT NUMBER
Performed: 2/1/2025 @ 12:00 AM
Report Issued: 2/1/2025
Status: SATISFACTORY (All erosion control measures are installed and in
working order)
Qualified Inspector (name and title) Qualified Professional (name and title)
Click or tap to enter a date. Click or tap to enter a date.
Date Date
Signature Signature
Page 559 of 1174
Page 560
NYSDEC Documentation and SWPPP Forms
The project has received a Letter of Authorization (LOA) from NYSDEC Choose an item.
The project has received a five acre waiver approved by NYSDEC or MS4 Choose an item.
The project currently has disturbance greater than five acres Choose an item.
The project directly discharges to a 303d waterbody/course Choose an item.
The project is within a phosphorus enhanced watershed Choose an item.
Number of inspections required per week Choose an item.
Included in Site Log Book
Preconstruction Assessment Choose an item.
Copy of Notice of Intent (NOI) Choose an item.
Letter of Authorization (LOA) Choose an item.
SWPPP Preparer Certification Form Choose an item.
Owner/Operator Certification Form Choose an item.
MS4 SWPPP Acceptance Form Choose an item.
NYCDEP SWPPP Acceptance/Approval Form Choose an item.
MS4 No Jurisdiction Form Choose an item.
Contractor and Subcontractor Certifications Choose an item.
SPDES General Permit Choose an item.
Five Acre Waiver Authorization Choose an item.
Notice of Termination (NOT) Choose an item.
Site Conditions
Total area (acres) with active soil disturbance (not requiring temporary or final stabilization)
Total area (acres) with inactive soil disturbance (requiring temporary or final stabilization)
Total area (acres) that has achieved temporary stabilization
Total area (acres) that has achieved final stabilization
Allowable disturbed area (acres) per NOI and/or five acre waiver
Provide a general description of construction activities ongoing during inspection:
Weather Conditions Choose an item.
Temperature at time of inspection XX degrees F
Soil conditions at time of inspection Choose an item.
Description of Discharge
Sediment Discharge
Point/Surface Waters of Condition of Runoff Corrective Action(s)
Noted
the State
Choose an item. Choose an item.
Choose an item. Choose an item.
Choose an item. Choose an item.
Choose an item. Choose an item.
Page 560 of 1174
Page 561
Erosion and Sediment Control Deficiencies and Corrective Actions
In the following table, provide marks in the appropriate columns to indicate the conditions of all erosion and
sediment control practices at the site.
Erosion & Sediment Control Functioning as Needs Repair or Not Installed
Not Applicable
Practice Designed Maintenance Properly
Temporary Erosion & Sediment Control Practices
General Site Conditions ☐ ☐ ☐ ☐
Stabilized Construction Access ☐ ☐ ☐ ☐
Silt Fence ☐ ☐ ☐ ☐
Inlet Protection Measures ☐ ☐ ☐ ☐
Soil Stockpiles ☐ ☐ ☐ ☐
Dust Control Measures ☐ ☐ ☐ ☐
Pavement Sweeping ☐ ☐ ☐ ☐
Temporary Stabilization ☐ ☐ ☐ ☐
Dewatering Operations ☐ ☐ ☐ ☐
Slope Protection Measures ☐ ☐ ☐ ☐
Temporary Parking Areas ☐ ☐ ☐ ☐
Concrete Washout ☐ ☐ ☐ ☐
Temporary Swales and Berms ☐ ☐ ☐ ☐
Stone Check Dams ☐ ☐ ☐ ☐
Sediment Traps/Basins ☐ ☐ ☐ ☐
Compost Filter Sock ☐ ☐ ☐ ☐
Temporary Stream Crossing ☐ ☐ ☐ ☐
Fiber Roll ☐ ☐ ☐ ☐
Water Bars ☐ ☐ ☐ ☐
Flow Diffusers ☐ ☐ ☐ ☐
Other: ☐ ☐ ☐ ☐
Permanent Erosion & Sediment Control Practices
Rock Outlet Protection ☐ ☐ ☐ ☐
Permanent Turf Reinforcement ☐ ☐ ☐ ☐
Permanent Stabilization ☐ ☐ ☐ ☐
Other: ☐ ☐ ☐ ☐
Refer to the following page for deficiencies and corrective actions
Page 561 of 1174
Page 562
Corrective Actions
For all erosion and sediment control practices identified in the above table as “needs repair or maintenance” or “not
installed properly,” provide detailed corrective actions that are required.
Date
Date
Deficiency Deficiency
ESC Practice ID Deficiency and Corrective Action Deficiency
First Corrected?
Corrected
Reported
Choose an item. Click or Choose an Click or tap
Choose an item. tap to
Click or item. an
Choose to enter
Click a
or tap
Choose an item. enter
tap to
Click a
or item. an
Choose date.
to enter
Click a
or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. an date.
to enter a
Choose an item. Click or Choose Click or tap
date.
enter
tap toa item. date.
to enter a
date.a
enter date.
date.
Page 562 of 1174
Page 563
Stormwater Management Practices
For all stormwater management practices proposed on the project, indicate the status of each practice at the time
of inspection, any deficiencies (if applicable) and corresponding corrective actions.
SMP
Sign Deficiency and Corrective Deficiency Corrected
Practice Status
Installed Action (if Applicable) Date Action Date
ID
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Choose Click or tap Click or tap
Choose an item.
an item. to enter a to enter a
date. date.
Page 563 of 1174
Page 564
Deficiencies and Corrective Action Photo Log
Deficiency Photo 1 Corrective Action Photo 1
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 2 Corrective Action Photo 2
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 3 Corrective Action Photo 3
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Page 564 of 1174
Page 565
Deficiencies and Corrective Action Photo Log (continued)
Deficiency Photo 4 Corrective Action Photo 4
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 5 Corrective Action Photo 5
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Deficiency Photo 6 Corrective Action Photo 6
ESC/SMP Practice ID: ESC/SMP Practice ID:
Deficiency Date: Click or tap to enter a date. Corrective Action Photo Date: Click or tap to enter a date.
Page 565 of 1174
Page 566
Disturbance / Photo Location Map
Replace this page to include an 11x17 erosion control plan sketch to scale showing:
1. Areas with active soil disturbance activity
2. Areas with inactive soil disturbance activity
3. Areas that have achieved temporary stabilization
4. Areas that have achieved final stabilization
5. Photo locations for deficiencies
6. Photo locations for corrective actions
7. Location of erosion and sediment control practices installed
Use Bluebeam template with standard colors to indicate limits
Page 566 of 1174
Page 567
Page 567 of 1174
Page 568
Appendix G:
Post-construction
inspections and maintenance
Page 568 of 1174
Page 569
Page 569 of 1174
Page 570
Bioretention Stormwater Management Practices
Level 1 Inspection Checklist
SMP ID # SMP Owner Private
Public
SMP Location
(Address; Latitude
& Longitude)
Latitude Longitude
Party Responsible for
System Type Type of Site
Maintenance
Same as SMP Owner Seasonal Above Ground Commercial
Other Continuous Use Below Ground Industrial
Other Residential
_________________________
State
Inspection Date Inspection Time
Inspector
Date of Last
Inspection
BR Drainage Area
Look for areas that are uphill from the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Seed and mulch areas of bare soil to establish
vegetation.
Bare soil, erosion Fill in erosion areas with soil, compact, and seed and
of the ground straw to establish vegetation.
(rills washing out If a rill or small channel is forming, try to redirect water
the dirt) flowing to this area by creating a small berm or adding
topsoil to areas that are heavily compacted.
Other:
Page 1 of 8
Page 570 of 1174
Page 571
BR Drainage Area
Look for areas that are uphill from the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Kick-Out to Level 2 Inspection: Large areas of soil
have been eroded, or larger channels are forming.
May require rerouting of flow paths.
Piles of grass Remove or cover piles of grass clippings,
clippings, mulch, mulch, dirt, etc.
dirt, salt, or
other materials Other:
Cover or properly dispose of materials; consult your
Open containers local solid waste authority for guidance on materials
of oil, grease, that may be toxic or hazardous.
paint, or other
substances
Other:
Page 2 of 8
Page 571 of 1174
Page 572
BR Inlets
Stand in the Bioretention cell itself and look for all the places where water flows in. Often there will be multiple points of inflow to the
practice.
Problem (Check if Present) Follow-Up Actions
Use a flat shovel to remove grit and debris (especially at curb inlets
or openings). Parking lots generate fine grit that will accumulate at
these spots.
Pull out clumps of growing grass or weeds and scoop out the soil or grit
that the plants are growing in.
Remove any grass clippings, leaves, sticks, and other debris that is
collecting at inlets.
For pipes and ditches, remove sediment and debris that is partially
blocking the pipe or ditch opening where it enters the Bioretention cell.
Dispose of all material properly where it will not re-enter the
Bioretention cell.
Other:
Inlets collect grit and debris or grass/weeds.
Some water may not be getting into the
Bioretention cell. The objective is to have a
clear pathway for water to flow into the cell.
Kick-Out to Level 2 Inspection: Inlets are blocked to the extent that most
of the water does not seem to be entering the Bioretention cell.
For small areas of erosion, smooth out the eroded part and apply rock or
stone (e.g., river cobble) to prevent further erosion. Usually, filter fabric is
placed under the rock or stone.
In some cases, reseeding and applying erosion-control matting can be
used to prevent further erosion. Some of these materials may be available
at a garden center, but it may be best to consult a landscape contractor.
Other:
Kick-Out to Level 2 Inspection: Erosion is occurring at most of the inlets,
Some or all of the inlets are eroding so that and it looks like there is too much water that is concentrating at these
rills, gullies, and other erosion is present, or points. The inlet design may have to be modified.
there is bare dirt that is washing into the
Bioretention cell.
Page 3 of 8
Page 572 of 1174
Page 573
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Add new mulch to a total depth (including any existing mulch that is left) of 2
to 3 inches. The mulch should be shredded hardwood mulch that is less
likely to float away during rainstorms.
Avoid adding too much mulch so that inlets are obstructed or certain areas
become higher than the rest of the Bioretention surface.
Other:
Mulch (if used) needs to be replaced or
replenished. The mulch layer had
decomposed or is less than 1-inch thick.
Use a shovel to scoop out minor areas of sediment or grit, especially in the
spring after winter sanding materials may wash in and accumulate. Dispose
of the material where it cannot re-enter the Bioretention cell .
If removing the material creates a hole or low area, fill with soil mix that
matches original mix and cover with mulch so that the Bioretention surface
area is as flat as possible.
Remove trash, vegetative debris, and other undesirable materials.
Other:
Kick-Out to Level 2 Inspection: Sediment has accumulated more than 2-
inches deep and covers 25% or more of the Bioretention surface.
Kick-Out to Level 2 Inspection: The Bioretention cell is too
densely vegetated to assess sediment accumulation or ponding;
Minor areas of sediment, grit, trash, or other see BR-4, Vegetation.
debris are accumulating on the bottom.
Page 4 of 8
Page 573 of 1174
Page 574
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Try filling the eroded areas with clean topsoil or sand, and cover with
mulch.
If the problem recurs, you may have to use stone (e.g., river cobble) to fill
in problem areas.
If the erosion is on a side slope, fill with clay that can be compacted and
seed and mulch the area.
Other:
There is erosion in the bottom or on the side
slopes. Water seems to be carving out rills as
it flows across the Bioretention surface or on
the slopes, or sinkholes are forming in certain Kick-Out to Level 2 Inspection: The problem persists or the erosion is more
areas. than 3-inches deep and seems to be an issue with how water enters and
Source: Stormwater Maintenance, LLC. moves through the Bioretention cell.
Kick-Out to Level 2 Inspection: The problem does not seem to be caused
by flowing water, but a collapse or sinking of the surface (e.g., “sinkhole”)
due to some underground problem.
If the problem is minor (just small, isolated areas are not covered with
water), try raking the surface OR adding mulch to low spots to create a
more level surface. You may need to remove and replace plantings in
order to properly even off the surface.
Check the surface with a string and bubble level to get the surface as flat
as possible.
Other:
Kick-Out to Level 2 Inspection: Ponding water is isolated to less than half
The bottom of the Bioretention cell is not flat,
of the Bioretention surface area, and there seem to be elevation
and the water pools at one end, along an
differences of more than a couple of inches across the surface.
edge, or in certain pockets. The whole bottom
is not uniformly covered with water. See
design plan to verify that bioretention surface
is intended to be flat. Check during or
immediately after a rainstorm.
Page 5 of 8
Page 574 of 1174
Page 575
BR Ponding Area
Examine the entire Bioretention surface and side slopes
Problem (Check if Present) Follow-Up Actions
Kick-Out to Level 2 Inspection: This is generally a serious problem, and it
will be necessary to activate a Level 2 Inspection.
Water stands on the surface more than 72
hours after a rainstorm and /or wetland-type
vegetation is present. The Bioretention cell
does not appear to be draining properly.
BR Vegetation
Examine all Bioretention cell vegetation.
Problem (Check if Present) Follow-Up Actions
If you can identify which plants are weeds or not intended to
be part of the planting plan, eliminate these, preferably by
hand pulling.
If weeds are widespread, check with the local stormwater
authority and/or Extension Office about proper use of
herbicides for areas connected with the flow of water.
Even vegetation that is intended to be present can become
large, overgrown, and/or crowd out surrounding plants. Prune
and thin accordingly.
If weeds or invasive plants have overtaken the whole
Bioretention cell , bush-hog the entire area before seedheads
form in the spring. It will be necessary to remove the root mat
manually or with appropriate herbicides, as noted above.
Re-plant with species that are aesthetically pleasing and
seem to be doing well in the Bioretention cell.
Other:
Kick-Out to Level 2 Inspection: You are unsure of the original
planting design, or the vegetation maintenance task is beyond
Vegetation requires regular maintenance—pulling
your capabilities of time, expertise, or resources. If you are
weeds, removing dead and diseased plants, replacing
unsure of the health of the vegetation (e.g. salt damage,
mulch around plants, adding plants to fill in areas that
invasives, which plants are undesirable) or the appropriate
are not well vegetated, etc.
season to conduct vegetation management, consult a
landscape professional before undertaking any cutting,
pruning, mowing, or brush hogging.
Page 6 of 8
Page 575 of 1174
Page 576
BR Vegetation
Examine all Bioretention cell vegetation.
Problem (Check if Present) Follow-Up Actions
The original plants are likely not suited for the actual
conditions within the Bioretention cell . If you are
knowledgeable about plants, select and plant more
appropriate vegetation (preferably native plants) so that
almost the entire surface area will be covered by the end of
the second growing season.
Other:
Kick-Out to Level 2 Inspection: For all but small practices
(e.g., rain gardens), this task will likely require a landscape
design professional or horticulturalist.
Vegetation is too thin, is not healthy, and there are
many spots that are not well vegetated.
BR Outlets
Examine outlets that release water out of the Bioretention cell.
Problem (Check if Present) Follow-Up Actions
Add stone to reduce the impact from the water flowing out of the outlet pipe or
weir during storms.
Other:
Erosion at outlet
Kick-Out to Level 2 Inspection: Rills have formed and erosion problem
becomes more severe.
Remove the debris and dispose of it where it cannot re-enter the
Bioretention cell .
Other:
Kick-Out to Level 2 Inspection: Outlet is completely clogged or obstructed;
there is too much material to remove by hand or with simple hand tools.
Outlet obstructed with mulch, sediment,
debris, trash, etc.
Page 7 of 8
Page 576 of 1174
Page 577
Additional Notes:
Inspector: Date:
Complete the following if follow-up/corrective actions were identified during this inspection:
Certified Completion of Follow-Up Actions:
“I hereby certify that the follow-up/corrective actions identified in the inspection
performed on _____________ (DATE) have been completed and any required
maintenance deficiencies have been adequately corrected.”
Inspector/Operator: Date:
Page 8 of 8
Page 577 of 1174
Page 578
Bioretention Stormwater Management Practices
Level 2 Inspection Checklist
SMP ID # SMP Owner Private
Public
SMP Location
(Address; Latitude
& Longitude)
Latitude Longitude
Party Responsible for
System Type Type of Site
Maintenance
Same as SMP Owner Seasonal Above Ground Commercial
Other Continuous Use Below Ground Industrial
Other Residential
_________________________ State
Inspection Date Inspection Time
Inspector
Date of Last
Inspection
Page 1 of 4
Page 578 of 1174
Page 579
Level 2 Inspection: BIORETENTION
NOTE: Key Source for this Information (CSN, 2013)
Recommended Repairs Triggers for Level 3 Inspection
Observed Condition: Water Stands on Surface for More than 72 Hours after Storm
Condition 1: Small pockets of standing water
Use a soil probe or auger to examine the soil profile. If isolated areas have
accumulated grit, fines, or vegetative debris or have bad soil media, try scraping
off top 3 inches of media and replacing with clean material. Also check to see
that surface is level and water is not ponding selectively in certain areas. Soil media is clogged and problem is not
evident from Level 2 inspection.
Level 2 inspection identifies problem, but it
Condition 2: Standing water is widespread or covers entire surface cannot be resolved easily or is associated
with the original design of the practice.
Requires diagnosis and resolution of problem:
Clogged underdrain?
Filter fabric between soil media and underdrain stone?
Need to install underdrain if not present? Level 3 inspection necessary
Too much sediment/grit washing in from drainage area?
Too much ponding depth?
Improper soil media?
Observed Condition: Vegetation is sparse or out of control
Condition 1: Original design planting plan seems good but has not been
maintained, so there are many invasives and/or dead plants
Vegetation deviates significantly from
Will require some horticultural experience to restore vegetation to intended original planting plan; Bioretention has
condition by weeding, pruning, removing plants, and adding new plants. been neglected and suffered from deferred
maintenance.
Owner/responsible party does not know
Condition 2: Original design planting plan is unknown or cannot be how to maintain the practice.
actualized
A landscape architect or horticulturalist will be needed to redo the planting plan.
Will likely require analysis of soil pH, moisture, organic content, sun/shade, and
other conditions to make sure plants match conditions. Plan should include Level 3 inspection necessary
invasive plant management and maintenance plan to include mulching,
watering, disease intervention, periodic thinning/pruning, etc.
Observed Condition: Bioretention does not conform to original design plan in surface area or storage
Condition 1: Level 2 Inspection reveals that practice is too small based More than a 25% departure from the
on design dimension, does not have adequate storage (e.g., ponding approved plan in surface area, storage, or
depth) based on the plan, and/or does not treat the drainage area runoff drainage area; sometimes less than this
as indicated on the plan threshold at the discretion of the Level 2
inspector.
Small areas of deviation can be corrected by the property owner or responsible
party, but it is likely that a Qualified Professional will have to revisit the design
and attempt a redesign that meets original objectives or that can be resubmitted
to the municipality for approval. Level 3 inspection necessary
Page 2 of 4
Page 579 of 1174
Page 580
Level 2 Inspection: BIORETENTION
NOTE: Key Source for this Information (CSN, 2013)
Recommended Repairs Triggers for Level 3 Inspection
Observed Condition: Severe erosion of filter bed, inlets, or around outlets
Condition 1: Erosion at inlets
The lining (e.g., grass, matting, stone, rock) may not be adequate for the actual
flow velocities coming through the inlets. First line of defense is to try a more
non-erosive lining and/or to extend the lining further down to where inlet slopes
meet the Bioretention surface. If problem persists, analysis by a Qualified Erosion (rills, gullies) is more than 12
Professional is warranted. inches deep at inlets or the filter bed or
more than 3 inches deep on side slopes.
If the issue is not caused by moving water
Condition 2: Erosion of Bioretention filter bed but some sort of subsurface defect. This
may manifest as a sinkhole or linear
This is often caused by “preferential flow paths” through and along the depression and be associated with
Bioretention surface. The source of flow should be analyzed and methods problems with the underdrain stone or pipe
employed to dissipate energy and disperse the flow (e.g., check dams, rock or underlying soil.
splash pads).
Condition 3: Erosion on side slopes
Level 3 inspection necessary
Again, the issue is likely linked with unanticipated flow paths down the side
slopes (probably overland flow that concentrates as it hits the edge of the
slope). For small or isolated areas, try filling, compacting, and re-establishing
healthy ground cover vegetation. If the problem is more widespread, further
analysis is required to determine how to redirect the flow.
Observed Condition: Significant sediment accumulation, indicating an uncontrolled source of sediment
Condition 1: Isolated areas of sediment accumulation, generally less than
3-inches deep
More than 2 inches of accumulated
Sediment source may be from a one-time or isolated event. Remove sediment cover 25% or more of the
accumulated sediment and top 2 to 3 inches of Bioretention soil media; replace Bioretention surface area.
with clean material. Check drainage area for any ongoing sources of sediment.
“Hard pan” of thin, crusty layer covers
majority of Bioretention surface area and
seems to be impeding flow of water down
Condition 2: Majority of the surface is caked with “hard pan” (thin layer of through the soil media.
clogging material) or accumulated sediment that is 3-inches deep or
more New sources of sediment seem to be
accumulating with each significant rainfall
This can be caused by an improper construction sequence (drainage area not event.
fully stabilized prior to installation of Bioretention soil media) or another chronic
source of sediment in the drainage area. Augering several holes down through
the media can indicate how severe the problem is; often the damage is confined
to the first several inches of soil media. Removing and replacing this top layer Level 3 inspection necessary
(or to the depth where sediment incursion is seen in auger holes) can be
adequate, as long as the problem does not recur.
Page 3 of 4
Page 580 of 1174
Page 581
Notes:
Inspector: Date:
Complete the following if follow-up/corrective actions were identified during this inspection:
Certified Completion of Follow-Up Actions:
“I hereby certify that the follow-up/corrective actions identified in the inspection
performed on _____________ (DATE) have been completed and any required
maintenance deficiencies have been adequately corrected.”
Inspector/Operator: Date:
Page 4 of 4
Page 581 of 1174
Page 582
Isolator® Row Plus
O&M Manual
Page 582 of 1174
Page 583
The Isolator® Row Plus
Introduction
An important component of any Stormwater Pollution Prevention Plan
is inspection and maintenance. The StormTech Isolator Row Plus is a
technique to inexpensively enhance Total Suspended Solids (TSS),
Total Phosphorus (TP), Total Petroluem Hydrocarbons (TPH) and
Total Nitrogen (TN) removal with easy access for inspection and
maintenance.
The Isolator Row Plus
The Isolator Row Plus is a row of StormTech chambers, either SC-160, SC-
310, DC-780, SC-800, MC-3500, MC-4500 or MC-7200 models, are lined with
filter fabric and connected to a closely located manhole for easy access.
Looking down the Isolator Row
The fabric lined chambers provide for sediment settling and filtration as
Plus from the manhole opening,
stormwater rises in the Isolator Row Plus and passes through the filter
ADS Plus Fabric is shown between
fabric. The open bottom chambers allow stormwater to flow vertically the chamber and stone base.
out of the chambers. Sediments are captured in the Isolator Row Plus
protecting the adjacent stone and chambers storage areas from sediment
accumulation.
ADS Isolator Row and Plus fabric are placed between the stone and the
Isolator Row Plus chambers. The woven geotextile provides a media for
stormwater filtration, a durable surface for maintenance, prevents scour
of the underlying stone and remains intact during high pressure jetting.
The Isolator Row Plus is designed to capture the “first flush” runoff and
offers the versatility to be sized on a volume basis or a flow-rate basis. An
upstream manhole provides access to the Isolator Row Plus and includes
a high/low concept such that stormwater flow rates or volumes that
exceed the capacity of the Isolator Row Plus bypass through a manifold to
the other chambers. This is achieved with an elevated bypass manifold or
a high-flow weir. This creates a differential between the Isolator Row Plus
row of chambers and the manifold to the rest of the system, thus allowing
for settlement time in the Isolator Row Plus. After Stormwater flows
through the Isolator Row Plus and into the rest of the chamber system StormTech Isolator Row Plus
it is either exfiltrated into the soils below or passed at a controlled rate with Overflow Structure
through an outlet manifold and outlet control structure. (not to scale)
The Isolator Row Plus FlampTM is a flared end ramp apparatus attached to
the inlet pipe on the inside of the chamber end cap. The FLAMP provides
a smooth transition from pipe invert to fabric bottom. It is configured
to improve chamber function performance by enhancing outflow of
solid debris that would otherwise collect at the chamber's end, or more
difficult to remove and require confined space entry into the chamber
area. It also serves to improve the fluid and solid flow into the access pipe
during maintenance and cleaning and to guide cleaning and inspection
equipment back into the inlet pipe when complete.
The Isolator Row Plus may be part of a treatment train system. The
treatment train design and pretreatment device selection by the
design engineer is often driven by regulatory requirements. Whether
pretreatment is used or not, StormTech recommend using the Isolator
Row Plus to minimize maintenance requirements and maintenance costs.
Note: See the StormTech Design Manual for detailed information on designing
inlets for a StormTech system, including the Isolator Row Plus.
2
Page 583 of 1174
Page 584
Isolator Row Plus Inspection/Maintenance
Inspection via a manhole(s) located on the end(s) of the row for
The frequency of inspection and maintenance varies cleanout. If entry into the manhole is required, please
by location. A routine inspection schedule needs to follow local and OSHA rules for a confined space
be established for each individual location based entry.
upon site specific variables. The type of land use Maintenance is accomplished with the JetVac
(i.e. industrial, commercial, residential), anticipated process. The JetVac process utilizes a high pressure
pollutant load, percent imperviousness, climate, water nozzle to propel itself down the Isolator Row
etc. all play a critical role in determining the actual Plus while scouring and suspending sediments.
frequency of inspection and maintenance practices. As the nozzle is retrieved, the captured pollutants
At a minimum, StormTech recommends annual are flushed back into the manhole for vacuuming.
inspections. Initially, the Isolator Row Plus should Most sewer and pipe maintenance companies have
be inspected every 6 months for the first year of vacuum/JetVac combination vehicles. Selection of an
operation. For subsequent years, the inspection appropriate JetVac nozzle will improve maintenance
should be adjusted based upon previous observation efficiency. Fixed nozzles designed for culverts or large
of sediment deposition. diameter pipe cleaning are preferable. Rear facing
jets with an effective spread of at least 45” are best.
The Isolator Row Plus incorporates a combination StormTech recommends a maximum nozzle pressure
of standard manhole(s) and strategically located of 2000 psi be utilized during cleaning. JetVac reels
inspection ports (as needed). The inspection ports can vary in length. For ease of maintenance, ADS
allow for easy access to the system from the surface, recommends Isolator Row Plus lengths up to 200'
eliminating the need to perform a confined space (61 m). The JetVac process shall only be performed
entry for inspection purposes. on StormTech Isolator Row Plus that have ADS
If upon visual inspection it is found that sediment Plus Fabric (as specified by StormTech) over their
has accumulated, a stadia rod should be inserted to angular base stone.
determine the depth of sediment. When the average
depth of sediment exceeds 3" (75 mm) throughout
the length of the Isolator Row Plus, clean-out should
be performed.
Maintenance
The Isolator Row Plus was designed to reduce the cost
of periodic maintenance. By “isolating” sediments
to just one row, costs are dramatically reduced
by eliminating the need to clean out each row of
the entire storage bed. If inspection indicates the
potential need for maintenance, access is provided
StormTech Isolator Row Plus (not to scale)
3
Page 584 of 1174
Page 585
Isolator Row Plus Step By Step Maintenance Procedures
Step 1
Inspect Isolator Row Plus for sediment.
A) Inspection ports (if present)
i. Remove lid from floor box frame
ii. Remove cap from inspection riser
iii. Using a flashlight and stadia rod,measure depth of sediment and record results on maintenance log.
iv. If sediment is at or above 3 inch depth, proceed to Step 2. If not, proceed to Step 3.
B) All Isolator Row Plus
i. Remove cover from manhole at upstream end of Isolator Row Plus
ii. Using a flashlight, inspect down Isolator Row Plus through outlet pipe
1. Mirrors on poles or cameras may be used to avoid a confined space entry
2. Follow OSHA regulations for confined space entry if entering manhole
iii. If sediment is at or above the lower row of sidewall holes (approximately 3 inches), proceed to Step
2.
If not, proceed to Step 3.
Step 2
Clean out Isolator Row Plus using the JetVac process.
A) A
fixed floor cleaning nozzle with rear facing nozzle spread of 45 inches or more is preferable
B) Apply multiple passes of JetVac until backflush water is clean
C) Vacuum manhole sump as required
Step 3
Replace all caps, lids and covers, record observations and actions.
Step 4
Inspect & clean catch basins and manholes upstream of the StormTech system.
1) B) 2 1) A)
4
Sample Maintenance Log
Stadia Rod Readings Sedi-
Fixed point ment
Date Fixed point Observations/Actions Inspector
to top of
to chamber Depth
sediment
bottom (1) (1)–(2)
(2)
3/15/11 6.3 ft none New installation. Fixed DJM
point is CI frame at grade
9/24/11 6.2 0.1 ft Some grit felt SM
6/20/13 5.8 0.5 ft Mucky feel, debris visible NV
in manhole and in Isolator
Row Plus, maintenance due adspipe.com
7/7/13 6.3 ft 0 System jetted and DJM 800-821-6710
vacuumed
ADS “Terms and Conditions of Sale” are available on the ADS website, www.adspipe.com
The ADS logo, StormTech®, the Isolator ® Row Plus and the Green Stripe are registered trademarks of Advanced Drainage Systems, Inc.
© 2025 Advanced Drainage Systems, Inc. #11081 5/25 CS
Page 585 of 1174
Page 586
Page 586 of 1174
Page 587
Appendix H:
NYSDEC “DEEP-RIPPING AND
DECOMPACTION”, APRIL 2008
Page 587 of 1174
Page 588
Page 588 of 1174
Page 589
New York State
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Document Prepared by:
John E. Lacey,
Land Resource Consultant and Environmental Compliance Monitor
Division of Water (Formerly with the Division of Agricultural Protection and Development Services,
NYS Dept. of Agriculture & Markets)
Deep-Ripping and
Decompaction
April 2008
New York State
Department of Environmental Conservation
Page 589 of 1174
Page 590
AlternativeȱStormwaterȱManagementȱ
DeepȬRippingȱandȱDecompactionȱ
ȱ ȱ ȱ ȱ ȱ ȱ ȱ ȱ ȱ Recommended Application of Practice
Description
Theȱobjective of Deep Ripping and
The two-phase practice of 1) “Deep Ripping;” and 2) “Decompaction” (deep subsoiling), of the Decompaction is to effectively fracture
soil material as a step in the cleanup and restoration/landscaping of a construction site, helps (vertically and laterallly) through the thickness
mitigate the physically induced impacts of soil compression; i.e.: soil compaction or the of the physically compressed subsoil material
substantial increase in the bulk density of the soil material. (see Figure 3), restoring soil porosity and
permeability and aiding infiltration to help
Deep Ripping and Decompaction are key factors which help in restoring soil pore space and reduce runoff. Together with topsoil stripping,
permeability for water infiltration. Conversely, the physical actions of cut-and-fill work, land the “two-phase” practice of Deep Ripping and
grading, the ongoing movement of construction equipment and the transport of building Decompaction first became established as a “best
materials throughout a site alter the architecture and structure of the soil, resulting in: the mixing management practice” through ongoing success
of layers (horizons) of soil materials, compression of those materials and diminished soil on commercial farmlands affected by heavy Fig. 3. Construction site with significant
porosity which, if left unchecked, severely impairs the soil’s water holding capacity and vertical utility construction right-of-way projects compaction of the deep basal till subsoil
drainage (rainfall infiltration), from the surface downward. (transmission pipelines and large power lines). extends 24 inches below this exposed cut-
and-fill work surface.
In a humid climate region, compaction damage on a site is virtually guaranteed over the duration Soil permeability, soil drainage and cropland
of a project. Soil in very moist to wet condition when compacted, will have severely reduced productivity were restored. For broader
permeability. Figure 1 displays the early stage of the deep-ripping phase (Note that all topsoil construction application, the two-phase practice of Deep Ripping and Decompaction is best
was stripped prior to construction access, and it remains stockpiled until the next phase – adapted to areas impacted with significant soil compaction, on contiguous open portions of large
decompaction – is complete). A heavy-duty tractor is pulling a three-shank ripper on the first of construction sites and inside long, open construction corridors used as temporary access over the
several series of incrementally deepening passes through the construction access corridor's duration of construction. Each mitigation area should have minimal above-and-below-ground
densely compressed subsoil material. Figure 2 illustrates the approximate volumetric obstructions for the easy avoidance and maneuvering of a large tractor and ripping/decompacting
composition of a loam surface soil when conditions are good for plant growth, with adequate implements. Conversely, the complete two-phase practice is not recommended in congested or
natural pore space for fluctuating moisture conditions. obstructed areas due to the limitations on tractor and implement movement.
Benefits
Aggressive “deep ripping” through the compressed thickness of exposed subsoil before the
replacement/respreading of the topsoil layer, followed by “decompaction,” i.e.: “sub-soiling,”
through the restored topsoil layer down into the subsoil, offers the following benefits:
x Increases the project (larger size) area’s direct surface infiltration of rainfall by
providing the open site’s mitigated soil condition and lowers the demand on
concentrated runoff control structures
Fig. 1. A typical deep ripping phase of this
practice, during the first in a series of Fig. 2. About 50% of the volume of undisturbed x Enhances direct groundwater recharge through greater dispersion across and through a
progressively deeper “rips” through severely loam surface soil is pore space, when soil is in broader surface than afforded by some runoff-control structural measures
compressed subsoil. good condition for plant growth. Brady, 2002.
x Decreases runoff volume generated and provides hydrologic source control
ȱ
x May be planned for application in feasible open locations either alone or in
1
2
Page 590 of 1174
Page 591
conjunction with plans for structural practices (e.g., subsurface drain line or lawn/ground cover to help maintain the restored subsoil structure. Infiltration after construction-
infiltration basin) serving the same or contiguous areas induced mixing and compression of such subsoil material can be notably rehabilitated with the
Deep Ripping and Decompaction practice, which prepares the site for the appropriate long-term
x Promotes successful long-term revegetation by restoring soil permeability, drainage and lawn/ground cover mix including deep taproot plants such as clover, fescue or trefoil, etc. needed
water holding capacity for healthy (rather than restricted) root-system development of for all rehabilitated soils.
trees, shrubs and deep rooted ground cover, minimizing plant drowning during wet
periods and burnout during dry periods. Generally, soils in Hydrologic Soil Groups A and B, which respectively may include deep, well-
drained, sandy-gravelly materials or deep, moderately well-drained basal till materials, are among
Feasibility/Limitations the easier ones to restore permeability and infiltration, by deep ripping and decompaction. Among
the many different soils in Hydrologic Soil Group C are those unique glacial tills having a natural
The effectiveness of Deep Ripping and Decompaction is governed mostly by site factors such as: fragipan zone, beginning about 12 to 18 inches (30 – 45cm), below surface. Although soils in
the original (undisturbed) soil’s hydrologic characteristics; the general slope; local weather/timing Hydrologic Soil Group C do require a somewhat more carefully applied level of the Deep Ripping
(soil moisture) for implementation; the space-related freedom of equipment/implement and Decompaction practice, it can greatly benefit such affected areas by reducing the runoff and
maneuverability (noted above in Recommended Application of Practice), and by the proper fostering infiltration to a level equal to that of pre-disturbance.
selection and operation of tractor and implements (explained below in Design Guidance). The
more notable site-related factors include: Soils in Hydrologic Soil Group D typically have a permanent high water table close to the surface,
influenced by a clay or other highly impervious layer of material. In many locations with clay
Soil subsoil material, the bulk density is so naturally high that heavy trafficking has little or no added
In the undisturbed condition, each identified soil type comprising a site is grouped into one of impact on infiltration; and structural runoff control practices rather than Deep Ripping and
four categories of soil hydrology, Hydrologic Soil Group A, B, C or D, determined primarily by a Decompaction should be considered.
range of characteristics including soil texture, drainage capability when thoroughly wet, and depth
to water table. The natural rates of infiltration and transmission of soil-water through the The information about Hydrologic Soil Groups is merely a general guideline. Site-specific data
undisturbed soil layers for Group A is “high” with a low runoff potential while soils in Group B such as limited depths of cut-and-fill grading with minimal removal or translocation of the inherent
are moderate in infiltration and the transmission of soil-water with a moderate runoff potential, subsoil materials (as analyzed in the county soil survey) or, conversely, the excavation and
depending somewhat on slope. Soils in Group C have slow rates of infiltration and transmission translocation of deeper, unconsolidated substratum or consolidated bedrock materials (unlike the
of soil-water and a moderately high runoff potential influenced by soil texture and slope; while analyzed subsoil horizons’ materials referred to in the county soil survey) should always be taken
soils in Group D have exceptionally slow into account.
rates of infiltration and transmission of soil-
water, and high runoff potential. Sites made up with significant quantities of large rocks, or having a very shallow depth to bedrock,
are not conducive to deep ripping and decompation (subsoiling); and other measures may be more
In Figure 4, the profile displays the practical.
undisturbed horizons of a soil in Hydrologic
Soil Group C and the naturally slow rate of Slope
infiltration through the subsoil. The slow rate The two-phase application of 1) deep ripping and 2) decompaction (deep subsoiling), is most
of infiltration begins immediately below the practical on flat, gentle and moderate slopes. In some situations, such as but not limited to
topsoil horizon (30 cm), due to the limited temporary construction access corridors, inclusion areas that are moderately steep along a project’s
amount of macro pores, e.g.: natural subsoil otherwise gentle or moderate slope may also be deep ripped and decompacted. For limited
fractures, worm holes and root channels. instances of moderate steepness on other projects, however, the post-construction land use and the
Infiltration after the construction-induced relative alignment of the potential ripping and decompaction work in relation to the lay of the
mixing and compression of such subsoil slope should be reviewed for safety and practicality. In broad construction areas predominated by
material is virtually absent; but can be moderately steep or steep slopes, the practice is generally not used.
restored back to this natural level with the
Fig. 4. Profile (in centimeters) displaying the Local Weather/Timing/Soil Moisture
two-phase practice of deep ripping and
infiltration test result of the natural undisturbed Effective fracturing of compressed subsoil material from the exposed work surface, laterally and
decompaction, followed by the permanent
horizons of a soil in Hydrologic Soil Group C. vertically down through the affected zone is achieved only when the soil material is moderately
establishment of an appropriate, deep taproot
dry to moderately moist. Neither one of the two-phases, deep ripping nor decompaction (deep
3 4
Page 591 of 1174
Page 592
subsoiling), can be effectively conducted when the soil material (subsoil or replaced topsoil) is in rainfall infiltration are being restored, a policy limiting all further traffic to permanent travel lanes
either a “plastic” or “liquid” state of soil consistency. Pulling the respective implements legs is maintained.
through the soil when it is overly moist only results in the “slicing and smearing” of the material or
added “squeezing and compression” instead of the necessary fracturing. Ample drying time is The other critical elements, outlined below, are: using the proper implements (deep, heavy-duty
needed for a “rippable” soil condition not merely in the material close to the surface, but rippers and subsoilers), and ample pulling-power equipment (tractors); and conducting the practice
throughout the material located down to the bottom of the physically compressed zone of the at the appropriate speed, depth and pattern(s) of movement.
subsoil.
Note that an appropriate plan for the separate practice of establishing a healthy perennial ground
The “poor man’s Atterberg field test” for soil cover, with deep rooting to help maintain the restored soil structure, should be developed in
plasticity is a simple “hand-roll” method used advance. This may require the assistance of an agronomist or landscape horticulturist.
for quick, on-site determination of whether or
not the moisture level of the affected soil
material is low enough for: effective deep Implements
ripping of subsoil; respreading of topsoil in a Avoid the use of all undersize implements. The small-to-medium, light-duty tool will, at best, only
friable state; and final decompaction (deep “scarify” the uppermost surface portion of the mass of compacted subsoil material. The term
subsoiling). Using a sample of soil material “chisel plow” is commonly but incorrectly applied to a broad range of implements. While a few
obtained from the planned bottom depth of may be adapted for the moderate subsoiling of non-impacted soils, the majority are less durable
ripping, e.g.: 20 - 24 inches below exposed and used for only lighter land-fitting (see Figure 6).
subsoil surface, the sample is hand rolled
between the palms down to a 1/8-inch diameter
thread. (Use the same test for stored topsoil Fig. 5. Augered from a depth of 19 inches
material before respreading on the site.) If the below the surface of the replaced topsoil,
respective soil sample crumbles apart in this subsoil sample was hand rolled to a
segments no greater than 3/8 of an inch long, by 1/8-inch diameter. The test shows the soil at
the time it is rolled down to 1/8 inch diameter, it this site stretches out too far without
is low enough in moisture for deep ripping (or crumbling; it indicates the material is in a
topsoil replacement), and decompaction. plastic state of consistence, too wet for final
Conversely, as shown in Figure 5, if the rolled decompaction (deep subsoiling) at this time.
sample stretches out in increments greater than
3/8 of an inch long before crumbling, it is in a “plastic” state of soil consistency and is too wet for
subsoil ripping (as well as topsoil replacement) and final decompaction.
Fig. 6. A light duty chisel implement, not Fig. 7. One of several variations of an
adequate for either the deep ripping or agricultural ripper. This unit has long, rugged
Design Guidance
shanks mounted on a steel V-frame for deep,
decompaction (deep subsoiling) phase.
aggressive fracturing through Phase 1.
Beyond the above-noted site factors, a vital requirement for the effective Deep Ripping and
Decompaction (deep subsoiling), is implementing the practice in its distinct, two-phase process:
Use a “heavy duty” agricultural-grade, deep ripper (see Figures 7,9,10 and 11) for the first phase:
1) Deep rip the affected thickness of exposed subsoil material (see Figure 10 and 11), aggressively the lateral and vertical fracturing of the mass of exposed and compressed subsoil, down and
fracturing it before the protected topsoil is reapplied on the site (see Figure 12); and through, to the bottom of impact, prior to the replacement of the topsoil layer. (Any oversize rocks
which are uplifted to the subsoil surface during the deep ripping phase are picked and removed.)
2) Decompact (deep subsoil), simultaneously through the restored topsoil layer and the upper half Like the heavy-duty class of implement for the first phase, the decompaction (deep subsoiling) of
of the affected subsoil (Figure 13). The second phase, “decompaction,” mitigates the partial Phase 2 is conducted with the heavy-duty version of the deep subsoiler. More preferable is the
recompaction which occurs during the heavy process of topsoil spreading/grading. Prior to deep angled-leg variety of deep subsoiler (shown in Figures 8 and 13). It minimizes the inversion of the
ripping and decompacting the site, all construction activity, including construction equipment and subsoil and topsoil layers while laterally and vertically fracturing the upper half of the previously
material storage, site cleanup and trafficking (Figure 14), should be finished; and the site closed off ripped subsoil layer and all of the topsoil layer by delivering a momentary, wave-like “lifting and
to further disturbance. Likewise, once the practice is underway and the area’s soil permeability and shattering” action up through the soil layers as it is pulled.
5 6
Page 592 of 1174
Page 593
Pulling-Power of Equipment Depth and Patterns of Movement
Use the following rule of thumb for tractor horsepower (hp) whenever deep ripping and As previously noted both Phase 1 Deep Ripping through significantly compressed, exposed subsoil
decompacting a significantly impacted site: For both types of implement, have at least 40 hp of and Phase 2 Decompaction (deep subsoiling) through the replaced topsoil and upper subsoil need
tractor pull available for each mounted shank/ leg. to be performed at maximum capable depth of each implement. With an implement’s guide wheels
attached, some have a “normal” maximum operating depth of 18 inches, while others may go
Using the examples of a 3-shank and a 5-shank implement, the respective tractors should have 120 deeper. In many situations, however, the tractor/implement operator must first remove the guide
and 200 hp available for fracturing down to the final depth of 20-to-24 inches per phase. Final wheels and other non essential elements from the implement. This adapts the ripper or the deep
depth for the deep ripping in Phase 1 is achieved incrementally by a progressive series of passes subsoiler for skillful pulling with its frame only a few inches above surface, while the shanks or
(see Depth and Patterns of Movement, below); while for Phase 2, the full operating depth of the legs, fracture the soil material 20-to-24 inches deep.
deep subsoiler is applied from the beginning.
There may be construction sites where the depth of the exposed subsoil’s compression is moderate,
The operating speed for pulling both types of e.g.: 12 inches, rather than deep. This can be verified by using a ¾ inch cone penetrometer and a
implement should not exceed 2 to 3 mph. At shovel to test the subsoil for its level of compaction, incrementally, every three inches of
this slow and managed rate of operating speed, increasing depth. Once the full thickness of the subsoil’s compacted zone is finally “pieced” and
maximum functional performance is sustained there is a significant drop in the psi measurements of the soil penetrometer, the depth/thickness of
by the tractor and the implement performing the compaction is determined. This is repeated at several representative locations of the construction
soil fracturing. Referring to Figure 8, the site. If the thickness of the site’s subsoil compaction is verified as, for example, ten inches, then
implement is the 6-leg version of the deep the Phase 1 Deep Ripping can be correspondingly reduced to the implement’s minimum operable
angled-leg subsoiler. Its two outside legs are depth of 12 inches. However, the Phase 2 simultaneous Decompation (subsoiling) of an 11 inch
“chained up” so that only four legs will be thick layer of replaced topsoil and the upper subsoil should run at the subsoiling implements full
engaged (at the maximum depth), requiring no operating depth.
less than 160 hp, (rather than 240 hp) of pull.
The 4-wheel drive, articulated-frame tractor in
Figure 8 is 174 hp. It will be decompacting this Fig. 8. A deep, angled-leg subsoiler, ideal for
unobstructed, former construction access area Phase 2 decompaction of after the topsoil layer
simultaneously through 11 inches of replaced is graded on top of the ripped subsoil.
topsoil and the upper 12 inches of the
previously deep-ripped subsoil. In constricted
areas of Phase 1) Deep Ripping, a medium-size
tractor with adequate hp, such as the one in
Figure 9 pulling a 3-shank deep ripper, may be
more maneuverable.
Some industrial-grade variations of ripping Fig. 10. An early pass with a 3-shank deep Fig. 11. A repeat run of the 3-shank ripper
implements are attached to power graders and ripper penetrating only 8 inches into this along the same patterned pass area as Fig. 9;
bulldozers. Although highly durable, they are worksite’s severely compressed subsoil. here, incrementally reaching 18 of the needed
generally not recommended. Typically, the 22 inches of subsoil fracture.
shanks or “teeth” of these rippers are too short
and stout; and they are mounted too far apart to
achieve the well-distributed type of lateral and Fig. 9. This medium tractor is pulling a 3- Typically, three separate series (patterns) are used for both the Phase 1 Deep Ripping and the
vertical fracturing of the soil materials shank deep ripper. The severely compacted Phase 2 Decompaction on significantly compacted sites. For Phase 1, each series begins with a
necessary to restore soil permeability and construction access corridor is narrow, and the moderate depth of rip and, by repeat-pass, continues until full depth is reached. Phase 2 applies the
infiltration. In addition, the power graders and 120 hp tractor is more maneuverable for Phase full depth of Decompation (subsoiling), from the beginning.
bulldozers, as pullers, are far less maneuverable 1 deep ripping (subsoil fracturing), here.
for turns and patterns than the tractor. Every separate series (pattern) consists of parallel, forward-and-return runs, with each progressive
7 8
Page 593 of 1174
Page 594
pass of the implement’s legs or shanks evenly staggered between those from the previous pass.
This compensates for the shank or leg-spacing on the implement, e.g., with 24-to-30 inches Ɣ A second series of passes makes a broad “S” shaped pattern of rips, continually
between each shank or leg. The staggered return pass ensures lateral and vertical fracturing and gradually alternating the “S” curves between opposite edges inside the
actuated every 12 to 15 inches across the densely compressed soil mass. compacted corridor.
Large, Unobstructed Areas Ɣ The third and final series again uses the broad, alternating S pattern, but it is
For larger easy areas, use the standard patterns of movement: “flip-flopped” to continually cross the previous S pattern along the corridor’s
centerline. This final series of the S pattern curves back along the edge areas
Ɣ The first series (pattern) of passes is applied lengthwise, parallel with the longest skipped by the second series.
spread of the site; gradually progressing across the site’s width, with each
successive pass. Maintenance and Cost
Ɣ The second series runs obliquely, crossing the first series at an angle of Once the two-phase practice of Deep Ripping and Decompation is completed, two items are
about 45 degrees. essential for maintaining a site’s soil porosity and permeability for infiltration. They are: planting
and maintaining the appropriate ground cover with deep roots to maintain the soil structure (see
Ɣ The third series runs at right angle (or 90 degrees), to the first series to complete Figure 15); and keeping the site free of traffic or other weight loads.
the fracturing and shattering on severely compacted sites, and avoid leaving large
unbroken blocks of compressed soil material. (In certain instances, the third series Note that site-specific choice of an appropriate vegetative ground-cover seed mix, including the
may be optional, depending on how thoroughly the first two series loosen the proper seeding ratio of one or more perennial species with a deep taproot system and the proper
material and eliminate large chunks/blocks of material as verified by tests with a ¾- amount of lime and soil nutrients (fertilizer mix) adapted to the soil-needs, are basic to the final
inch cone penetrometer.) practice of landscaping, i.e: surface tillage, seeding/planting/fertilizing and culti-packing or
mulching is applied. The "maintenance" of an effectively deep-ripped and decompacted area is
generally limited to the successful perennial (long-term) landscape ground cover; as long as no
weight-bearing force of soil compaction is applied.
Fig. 13. The same deep, angled-leg subsoiler
Fig. 12. Moderately dry topsoil is being
shown in Fig. 7 is engaged at maximum
replaced on the affected site now that Phase 1
depth for Phase 2, decompaction (deep
deep ripping of the compressed subsoil is
soiling), of the replaced topsoil and the upper Fig. 15. The same site as Fig. 14 after deep
complete. Fig. 14. The severely compacted soil of a
subsoil materials. ripping of the exposed subsoil, topsoil
temporary construction yard used daily by replacement, decompaction through the
heavy equipment for four months; shown topsoil and upper subsoil and final surface
before deep ripping, topsoil replacement, and tillage and revegetation to maintain soil
Corridors
decompaction. permeability and infiltration.
In long corridors of limited width and less maneuverability than larger sites, e.g.: along
compacted areas used as temporary construction access, a modified series of pattern passes
are used.
Ɣ First, apply the same initial lengthwise, parallel series of passes described above.
9 10
Page 594 of 1174
Page 595
The Deep Ripping and Decompaction practice is, by necessity, more extensive than periodic Resources
subsoiling of farmland.The cost of deep ripping and decompacting (deep subsoiling), will vary
according to the depth and severity of soil-material compression and the relative amount of Publications:ȱ
tractor and implement time that is required. In some instances, depending on open ȣȱAmericanȱȱSocietyȱofȱȱAgriculturalȱEngineers.ȱ1971.ȱȱCompactionȱofȱȱAgriculturalȱȱSoils.ȱȱASAE.ȱ
maneuverability, two-to-three acres of compacted project area may be deep-ripped in one day. In ȱ
other situations of more severe compaction and - or less maneuverability, as little as one acre may ȣȱBrady,ȱN.C.,ȱandȱR.R.ȱWeil.ȱ2002.ȱȱTheȱȱNatureȱȱandȱȱPropertiesȱȱofȱȱSoils.ȱ13thȱed.ȱPearsonȱEducation,ȱInc.ȱ
be fully ripped in a day. Generally, if the Phase 1) Deep Ripping is fully effective, the Phase 2) ȱ
Decompaction should be completed in 2/3 to 3/4 of the time required for Phase 1. ȣȱBaver,ȱL.D.ȱ1948.ȱSoilȱPhysics.ȱJohnȱWileyȱ&ȱSons.ȱ
ȱ
Using the example of two acres of Phase 1) Deep Ripping in one day, at $1800 per day, the net ȣȱCarpachi,ȱN.ȱ1987ȱ(1995ȱfifthȱprinting).ȱExcavationȱandȱGradingȱHandbook,ȱRevised.ȱȱ2ndȱed.ȱCraftsmanȱBookȱ
cost is $900 per acre. If the Phase 2) Decompacting or deep subsoiling takes 3/4 the time as Phase Companyȱ
1, it costs $675 per acre for a combined total of $1575 per acre to complete the practice (these ȣȱEllis,ȱB.ȱ(Editor).ȱ1997.ȱȱSafeȱ&ȱEasyȱLawnȱCare:ȱȱTheȱCompleteȱGuideȱtoȱOrganicȱLowȱMaintenanceȱLawn.ȱȱ
figures do not include the cost of the separate practice of topsoil stripping and replacement). Due HoughtonȱMifflin.ȱ
to the many variables, it must be recognized that cost will be determined by the specific conditions ȱ
or constraints of the site and the availability of proper equipment. ȣȱ Harpstead,ȱ M.I.,ȱ T.J.ȱ Sauer,ȱ andȱ W.F.ȱ Bennett.ȱ 2001.ȱ ȱ Soilȱ Scienceȱ Simplified.ȱ 4thȱ ed.ȱ Iowaȱ Stateȱ Universityȱȱ
Press.ȱ
ȱ
ȣȱ ȱ Magdoff,ȱ F.,ȱ ȱ andȱ ȱ H.ȱ vanȱ Es.ȱ ȱ 2000.ȱ ȱ Buildingȱ Soilsȱ ȱ forȱ ȱ Betterȱ Crops.ȱ 2ndȱ ed.ȱ Sustainableȱ Agriculturalȱ
Networksȱ
ȱ
ȣȱȱMcCarthy,ȱD.F.ȱ1993.ȱEssentialsȱofȱSoilȱMechanicsȱandȱFoundations,ȱBasicȱGeotechnicsȱ4thȱed.ȱRegents/Prenticeȱ
Hall.ȱ
ȱ
ȣȱȱȱȱȱȱPlaster,ȱE.J.ȱ1992.ȱSoilȱScienceȱ&ȱManagement.ȱ3rdȱed.ȱDelmarȱPublishers.ȱ
ȱ
ȣȱ ȱ ȱ Unionȱ Gasȱ Limited,ȱ Ontario,ȱ Canada.ȱ 1984.ȱ Rehabilitationȱ ofȱ Agriculturalȱ Lands,ȱ DawnȬKerwoodȱ ȱ Loopȱȱ
Pipeline;ȱȱȱTechnicalȱȱȱReport.ȱȱȱEcologicalȱȱȱServicesȱȱforȱȱPlanning,ȱȱLtd.;ȱRobinson,ȱMerrittȱ&ȱDevries,ȱ
Ltd.ȱandȱSmith,ȱHoffmanȱAssociates,ȱLtd.ȱ
ȱ
ȣȱȱȱUSȱDepartmentȱofȱAgricultureȱinȱcooperationȱwithȱCornellȱUniversityȱAgriculturalȱExperimentȱȱStation.ȱȱ
Variousȱyears.ȱȱSoilȱȱSurveyȱofȱȱ(variousȱnames)ȱȱCounty,ȱȱNewȱYork.ȱUSDA.ȱ
ȱ
InternetȱAccess:ȱ
ȣȱȱȱȱExamplesȱofȱimplements:ȱȱ
ȱVȬRippers.ȱȱAccessȱbyȱȱinternetȱsearchȱofȱJohnȱDeereȱAgȱȬNewȱEquipmentȱȱȱforȱȱ915ȱȱ(largerȬframeȱmodel)ȱȱVȬ
Rippe;ȱȱand,ȱȱȱforȱ913ȱȱ(smallerȬframeȱmodel)ȱVȬRipper.ȱȱDeep,ȱangledȬlegȱsubsoiler.ȱȱAccessȱȱbyȱȱinternetȱ
searchȱȱof:ȱBighamȱȱBrothersȱShearȱBoltȱȱParatillȬSubsoiler.ȱ
http://salesmanual.deere.com/sales/salesmanual/en_NA/primary_tillage/2008/feature/rippers/915v_pattern_frame.html?sbu=a
g&link=prodcat LastȱvisitedȱMarchȱ08.ȱ
ȱ
ȣȱ Soilsȱ dataȱ ofȱ USDAȱ Naturalȱ Resourcesȱ Conservationȱ Service.ȱ NRCSȱ Webȱ Soilȱ Survey.ȱȱȱȱȱȱȱȱȱȱȱȱȱȱ
http://websoilsurvey.nrcs.usda.gov/app/ȱȱȱandȱȱUSDAȬNRCSȱȱOfficialȱȱSoilȱȱSeriesȱDescriptions;ȱViewȱbyȱ
Name.ȱhttp://ortho.ftw.nrcs.usda.gov/cgiȬbin/osd/osdname.cgiȱ.ȱLastȱvisitedȱJan.ȱ08.ȱ
ȱ
ȣȱȱSoilȱȱpenetrometerȱȱinformation.ȱȱAccessȱȱbyȱȱȱinternetȱȱsearchesȱȱof:ȱȱȱDiagnosingȱSoilȱCompactionȱȱȱusingȱȱaȱ
Penetrometerȱ(soilȱcompactionȱtester),ȱPSUȱExtension;ȱȱasȱȱwellȱȱasȱDickeyȬjohnȱSoilȱCompactionȱTester.ȱ
http://www.dickey-johnproducts.com/pdf/SoilCompactionTest.pdf and http://cropsoil.psu.edu/Extension/Facts/uc178pdf Lastȱ
visitedȱSept.ȱ07ȱ
11 12
Page 595 of 1174
Page 596
Page 596 of 1174
Page 597
Appendix I:
LABELLA CERTIFYING
PROFESSIONALS LETTER
Page 597 of 1174
Page 598
Page 598 of 1174
Page 599
February 21, 2025
RE: LaBella Certifying Professionals for NYSDEC SPDES GP-0-25-001
To Whom it May Concern:
In accordance with the NYSDEC SPDES General Permit GP-0-25-001, Part VII.J.2, Kristopher Winkler,
PE, a New York State Qualified Professional employed by LaBella Associates, is duly authorized to sign
and seal Stormwater Pollution Prevention Plans (SWPPPs), Notice of Intents (NOIs) and Notice of
Terminations (NOTs).
Respectfully submitted,
LaBella Associates
Timothy Webber Kristopher Winkler, PE
Vice President, Civil Division Director Senior Civil Engineer
Team Leader
Page 599 of 1174
Page 600
Page 600 of 1174
Page 601
Appendix J:
NYSDEC SPDES GENERAL PERMIT
GP-0-25-001
Page 601 of 1174
Page 602
Page 602 of 1174
Page 603
Page 603 of 1174
Page 604
Page 604 of 1174
Page 605
Page 605 of 1174
Page 606
Page 606 of 1174
Page 607
Page 607 of 1174
Page 608
Page 608 of 1174
Page 609
Page 609 of 1174
Page 610
Page 610 of 1174
Page 611
Page 611 of 1174
Page 612
Page 612 of 1174
Page 613
Page 613 of 1174
Page 614
Page 614 of 1174
Page 615
Page 615 of 1174
Page 616
Page 616 of 1174
Page 617
Page 617 of 1174
Page 618
Page 618 of 1174
Page 619
Page 619 of 1174
Page 620
Page 620 of 1174
Page 621
Page 621 of 1174
Page 622
Page 622 of 1174
Page 623
Page 623 of 1174
Page 624
Page 624 of 1174
Page 625
Page 625 of 1174
Page 626
Page 626 of 1174
Page 627
Page 627 of 1174
Page 628
Page 628 of 1174
Page 629
Page 629 of 1174
Page 630
Page 630 of 1174
Page 631
Page 631 of 1174
Page 632
Page 632 of 1174
Page 633
Page 633 of 1174
Page 634
Page 634 of 1174
Page 635
Page 635 of 1174
Page 636
Page 636 of 1174
Page 637
Page 637 of 1174
Page 638
Page 638 of 1174
Page 639
Page 639 of 1174
Page 640
Page 640 of 1174
Page 641
Page 641 of 1174
Page 642
Page 642 of 1174
Page 643
Page 643 of 1174
Page 644
Page 644 of 1174
Page 645
Page 645 of 1174
Page 646
Page 646 of 1174
Page 647
Page 647 of 1174
Page 648
Page 648 of 1174
Page 649
' 39
169.
S43
° 42
' 17"
E 1
41"E
78.0
593.19
0'
° 55'
S59° 29' 13"E 117.85'
N45
600.14
ST
ST
602.49
602.51
594.95
594.92
C0
UD ST UD UD UD
ST UD C
600
60
0
N0
0°
C
NEW PRIVATE
FIRE HYDRANT
32
'1
7"E
FS
ST
17
4.6
600
AREA 4.4
2'
AREA 1
C0
FS
600
NEW 6" FIRE SERVICE
600
(AFTER BACKFLOW
PREVENTOR)
ST-3.4
ST
PROPOSED
PLAYGROUND ST-3.4
FS
ST
AREA 4.3
NEW BACKFLOW PREVENTOR (IN
FS
ST
MECHANICAL ROOM) FOR COMBINED
AREA 4.2
SERVICE. DOMESTIC SERVICE WILL BE
AREA 4.1 PROPOSED
3-STORY
METERED AFTER THE BACKFLOW.
ST-3.3 AREA 2
C0
N22° 31'
CHAM BUILDING
± 25,000 SF FOOTPRINT
ST-3.0
ST-3.3C
38"E 13
C0
C0 C0
C0
ST ST ST
C0
ST
C0
ST ST ST ST
SA
600
SA
ST
9.72'
SA
ST
ST
SA S
SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA
SA
ST
AREA 7 AREA 3
ST
ST
SA
599
599
ST-2.2 AREA 8
600
ST-3.2
SA
ST
599 D D
599
AREA 6 AREA 5 ST-6.1
59
SA
ST
ST
9
599
C ST C
ST-2.1 ST-3.1 C
ST ST ST C
SA
ST ST ST ST D D
599
SA
RIM=599.00 599 NEW 6" COMBINED
8'
WATER SERVICE
NEW PRIVATE
0"E 182.9
FIRE HYDRANT
SA
600
FS
NEW 6" FIRE SERVICE 600
N36° 27' 1
(AFTER BACKFLOW
598
599
598
599
PREVENTOR)
599
DS
596.55
594.04
DS
NEW BACKFLOW PREVENTOR
(IN MECHANICAL ROOM) FOR
598
COMBINED SERVICE.
597
59987
DOMESTIC SERVICE WILL BE
S29° 45' 50"W
METERED AFTER THE
5
600
BACKFLOW.
C0
UD
5 9987 UD
5596.50
5 9 6 UD UD
60 UD UD
5 95966.50
18'
C
0
NEW 6" COMBINED 5 9978
5
117.
WATER SERVICE ST
ST
600
S60° 14' 10"E
37"E
ST
ST 598
88.00'
° 50'
59
9 59796
D
ST 599.84
ST 5 6
ST
AREA 8 59978
15.7'
N45
ST
ST 59
ST
ST
5
598
ST
ST 598 NEW 6" COMBINED
131.00'
WATER SERVICE
C0
UD UD UD
596
595
UD UD UD
C
ST-6.1
595
131.00'
C
598.87 9
59
'
.41
595.50
S29° 45' 50"W
596
97
598
598
597
596
595
595
59 6
5987
59
T
2"E
ST ST ST ST ST ST D
ST ST ST ST ST ST C
'5
16
598
8°
N5
N60° 14' 10"W
N60° 14' 10"W 257.62' 88.00'
N18° 32' 09"E 303.36'
CONNECT TO EXISTING 6"
49.86' ' 45"W
WATERMAIN WITH TS&V
N69° 30
N
WEST SENECA APARTMENTS DATE: 06/23/2026
SITE PIPE SIZING CONTRIBUTING AREAS SCALE: 1"=40'
Page 649 of 1174
Page 650
ENGINEERING.ARCHITECTURE.ENVIRONMENTAL.PLANNING
300 State Street, Suite 201 ● Rochester, NY 14614
Phone 585.454.6110 ● Fax 585.454.3066
www.labellapc.com
Project: West Seneca Apartments
Project No.: 2241067
Subject Pipe Sizing Calculations
Calc By: JB
Date: 6/15/2026
Catchment # Total (Acre) Weighted Value
Pervious (SF) Impervious (SF)
COLUMN C COLUMN D COLUMN E
1 ST-3.4 816.00 8,177.00 0.21 0.84
2 ST-3.3 300.00 4,946.00 0.12 0.86
3 ST-3.2 3,905.00 12,827.00 0.38 0.74
4.1 CHAM 0.00 7,189.00 0.17 0.90
5 ST-3.1 1,198.00 17,386.00 0.43 0.85
6 ST-2.1 760.00 15,654.00 0.38 0.87
7 ST-2.2 548.00 6,725.00 0.17 0.85
8 ST-6.1 259,605.00 0.00 5.96 0.20
4.2 ST-3.0 0.00 7,189.00 0.17 0.90
4.3 ST-3.3 0.00 4,388.00 0.10 0.90
4.4 ST-3.4 0.00 6,627.00 0.15 0.90
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
Totals for System
266316 SF 82931 SF
Catchment 8.02 Acres
6.11 Acres 1.9 Acres
Page 650 of 1174
Page 651
ENGINEERING.ARCHITECTURE.ENVIRONMENTAL.PLANNING Job # 2241067
300 State Street, Suite 201 ● Rochester, NY 14614 Project: West Seneca Apartments
Phone 585.454.6110 ● Fax 585.454.3066 Date: 6/15/2026
www.labellapc.com By: JB
Location: West Seneca, NY
Design Storm Event: 10-Year
Roughness Coefficient, N = 0.013
Storm Sewer Sizing Calculations, Run 01
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
ST-3.4 ST-3.3 1 ST-3.4 0.21 0.84 0.17 0.31 6.00 12.19 3.77 18 150 0.90% 0.67 5.7 0.44 1.50 1.767 4.712 0.375 9.99 PASS
ST-3.3 ST-3.2 2 ST-3.3 0.12 0.86 0.10 0.50 10.00 9.52 4.80 18 102 0.90% 0.85 5.7 0.30 1.50 1.767 4.712 0.375 9.99 PASS
ST-3.2 ST-3.1 3 ST-3.2 0.38 0.74 0.28 0.79 10.30 9.37 7.38 18 85 2.00% 0.88 8.4 0.17 1.50 1.767 4.712 0.375 14.90 PASS
ST-3.1 ST-3.0 5 ST-3.1 0.43 0.85 0.36 1.15 10.47 9.30 10.70 18 35 1.30% 1.58 6.8 0.09 1.50 1.767 4.712 0.375 12.01 PASS
#N/A #N/A #N/A #N/A 10.55 9.26 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 1.15 Ac
Next Tc = 10.55 Min.
Storm Sewer Sizing Calculations, Run 02
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
ST-2.2 ST-2.1 7 ST-2.2 0.17 0.85 0.14 0.14 5.00 13.19 1.87 12 50 2.00% 0.29 6.4 0.13 1.00 0.785 3.142 0.250 5.05 PASS
ST-2.1 CHAM 6 ST-2.1 0.38 0.87 0.33 0.47 5.13 13.05 6.11 18 30 1.83% 0.76 8.1 0.06 1.50 1.767 4.712 0.375 14.25 PASS
#N/A #N/A #N/A #N/A 5.19 12.98 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.47 Ac
Next Tc = 5.19 Min.
Storm Sewer Sizing Calculations, Run 03
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
BLDG CHAM 4.1 CHAM 0.17 0.90 0.15 0.15 5.00 13.19 1.96 10 206 1.25% 0.43 4.5 0.76 0.83 0.545 2.618 0.208 2.46 PASS
#N/A #N/A #N/A #N/A 5.76 12.41 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.15 Ac
Next Tc = 5.76 Min.
Page 651 of 1174
Page 652
Storm Sewer Sizing Calculations, Run 04
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
SWALE ST-6.1 8 ST-6.1 5.96 0.20 1.19 1.19 59.40 3.26 3.89 15 177 1.00% 0.74 5.3 0.56 1.25 1.227 3.927 0.313 6.48 PASS
#N/A #N/A #N/A #N/A 59.96 3.24 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 1.19 Ac
Next Tc = 59.96 Min.
Storm Sewer Sizing Calculations, Run 05
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
AREA 4.2 ST-3.0 4.2 ST-3.0 0.17 0.90 0.15 0.17 5.00 13.19 2.18 10 209 1.00% 0.54 4.0 0.86 0.83 0.545 2.618 0.208 2.20 PASS
#N/A #N/A #N/A #N/A 5.86 12.31 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.17 Ac
Next Tc = 5.86 Min.
Storm Sewer Sizing Calculations, Run 06
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
AREA 4.3 AREA 2 4.3 ST-3.3 0.10 0.90 0.09 0.09 5.00 13.19 1.20 10 26 3.38% 0.16 7.4 0.06 0.83 0.545 2.618 0.208 4.04 PASS
#N/A #N/A #N/A #N/A 5.06 13.12 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.09 Ac
Next Tc = 5.06 Min.
Page 652 of 1174
Page 653
Storm Sewer Sizing Calculations, Run 07
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
AREA 4.4 AREA 3.4 4.4 ST-3.4 0.15 0.90 0.14 0.14 5.00 13.19 1.81 10 26 1.00% 0.45 4.0 0.11 0.83 0.545 2.618 0.208 2.20 PASS
#N/A #N/A #N/A #N/A 5.11 13.07 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.14 Ac
Next Tc = 5.11 Min.
Page 653 of 1174
Page 654
0.0
0.0
NOT FOR CONSTRUCTION
0.0 Luminaire Schedule
0.0
0.0 0.0 Symbol Tag Label Arrangement Description LLF Luminaire Luminaire Total Mounting BUG Rating
0.0
0.0 Lumens Watts Watts Height
0.0
0.0
0.0 0.0 S1 LITHONIA RSX1 LED P1 40K R3 Single RSX1 LED P1 40K R3 0.850 7096 51.34 718.76 20 B1-U0-G2
0.0 0.0
0.0 S2 LITHONIA RSX1 LED P1 40K R5 Back-Back RSX1 LED P1 40K R5 0.850 7284 51.34 410.72 20 B3-U0-G2
0.0
0.0 S3 LITHONIA RSX1 LED P1 40K R3 Single RSX1 LED P1 40K R3 0.850 7096 51.34 718.76 10 B1-U0-G2
0.0 0.0
0.0 0.0
0.0 0.0 300 Pearl Street, Suite 130
0.0 0.0
0.0 0.0 Calculation Summary
0.0
0.0 0.0
0.0
Label CalcType Units Avg Max Min Avg/Min Max/Min Max/Avg Buffalo, NY 14202
0.0 0.0
0.0
0.0 0.0 0.0 0.1
0.1 0.1 Parking Lot Illuminance Fc 0.86 5.0 0.0 N.A. N.A. 5.81 716-551-6281
0.0 0.1 0.1
0.1 0.1
0.1
0.1
0.1 0.1
0.1 Isoline Legend labellapc.com
0.0 0.2 0.1
0.0 0.1 0.1 Illuminance (Fc)
0.0 0.1 0.2 0.2
0.0 0.2 0.2 0.1
0.2 0.3 0.1 Color Value
0.3 0.1
0.1 0.4 0.1 0.1
0.0 0.4 0.2
0.0 0.1 0.2 0.4 0.3
0.0 0.4 0.4 0.1 0.5
0.0 0.5 0.1
0.6 0.1 1
0.6 0.2
0.1 0.7
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
0.1 0.4 0.6 0.3
0.0 0.1 0.2 0.5 0.1
0.0 0.1
0.0 0.8 0.5 0.2
1.0 0.9 0.2
1.1 1.1 0.3
0.8 1.0 1.0
0.1 0.3 0.5
0.1 0.2 0.1
0.0 0.2
0.0 0.6 0.4 0.3
1.2 0.9 0.4
1.7 1.4 0.4
1.5 1.7
0.1 0.5 0.8 1.2 0.0
0.1 0.3 0.3 0.2
0.1 0.5 0.4
0.0 0.5 0.4 0.5
1.2 0.8 0.6
1.8
S1 0.0 EXP: EXP:
0.2 0.4 0.4 0.5 0.8 1.4 2.3 2.7 2.0 1.3 0.8 0.1
0.2 0.3 0.4 0.2
0.1 0.8 0.6
0.0 0.4 0.6 0.9
0.0 1.0
0.4 0.1 CERTIFICATE OF AUTHORIZATION NUMBER:
0.4 0.3 1.0 1.2 0.8 0.5 0.3 0.3 0.1
0.3 0.5 0.5 0.3 PROFESSIONAL ENGINEERING: 0021272
0.1 0.9 0.9
0.1 0.3 0.6 1.3 LAND SURVEYING: 0021271
0.0 1.1
0.1 GEOLOGICAL: 0021659
0.7 0.5 0.0 0.1 0.2 0.2
0.4 0.8 0.9 0.4
0.2 1.0 1.3
0.1 0.3 0.6
0.0 0.0 0.1
0.8 0.1 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
0.5 0.9 0.0 0.3
0.2 0.9 1.2 2.5 0.6 Sec. 7307, for any person, unless acting under the direction of a licensed
0.7 1.1 1.6 1.7
0.0
0.1
0.0 0.1 0.3 S1 architect, professional engineer, or land surveyor, to alter an item in any
0.9 0.0 way. If an item bearing the seal of an architect, engineer, or land surveyor
0.5 1.4 0.0 0.0
0.3 1.0 1.5 2.7 0.7 is altered; the altering architect, engineer, or land surveyor shall affix to
1.1 1.7 1.5
0.1 0.3 0.7 the item their seal and notation "altered by" followed by their signature and
0.0 0.0 0.1
0.0 date of such alteration, and a specific description of the alteration.
0.0 0.1
0.6 2.1 0.9 0.0 0.0 0.2
0.3 1.1 1.9 1.8 0.4
0.1 0.7 1.0 1.5 0.9
0.0 S1 0.1 0.4
0.0 0.1 © 2024
2026 LaBella Associates
0.0 0.1
0.0 0.7 2.2 0.9 0.0 0.1
0.3 1.1 1.9 1.2 0.2
0.1 1.0 1.3 0.5
0.4 0.7
0.0 0.1 0.2
0.0
0.0 0.0
0.0 1.5 0.0 0.1
0.0 1.1 1.5 0.1
1.0 0.8 0.3
0.7 1.0
0.2 0.4
0.1
0.0 0.0
0.0
0.0
0.0
1.0 1.2
0.9 0.0 0.1
0.0 HOME LEASING
0.0 0.0 0.7 0.5 0.2
0.0 0.0
0.0
0.2 0.4 0.6 0.8 0.5 75 S CLINTON AVE SUITE 700,
0.0 0.0 0.1
0.0 0.0 0.0 ROCHESTER, NEW YORK 14604
0.0 0.0 0.0 0.0
0.0 0.0 0.6 0.0 0.1
0.0 0.0 0.7 0.5 0.2
0.0 0.0 0.6 0.8 0.5
0.0 0.2 0.4
0.0 0.0 0.1
0.0 0.0 0.0 0.5
0.0 0.0 0.0 0.6 0.0
0.0 0.0 0.0 0.3 0.0 0.1
0.0 0.0 1.0 0.2
0.0 0.0 0.4 0.7 1.0 0.6
0.0 0.0 0.1 0.2
0.0 0.0 0.0 0.3
0.0 0.0 0.0 0.3
0.0 0.0 0.0 0.3 0.2 0.0 0.1
0.0 0.0 0.0 0.2 0.1
0.0 0.0 1.3 0.2
0.0 0.0 0.1 0.7 1.0 0.9
0.0 0.0 0.1 0.2 0.4
0.0 0.0 0.1
0.0 0.0 0.0 0.2
0.0 0.0 0.2 0.1
0.0 0.0 0.0 0.0 0.2
0.0 0.4
0.0 0.7 1.1 1.5 1.2
0.2 0.4
0.1
0.0 0.1
0.0 0.0 0.3
0.0 0.6
0.0 1.1 1.9 S1 1.5
0.0 0.2 0.4 0.8
0.1
0.0
0.0
0.0 PROPOSED 0.0
1.2 1.9 1.2
0.6
0.3
0.1
0.0 0.4 0.8
0.2
0.0
0.0
0.0
3-STORY 0.0
0.1
0.2
0.1
0.0 1.6 0.3
1.1 0.7
0.0
0.0
BUILDING 0.1 0.2 0.4 0.8 1.6
0.0 0.0 0.1
0.0
0.0
0.0
0.0
0.0
± 25,000 SF FOOTPRINT 0.1 0.2 0.5 0.8 1.1 1.3
0.9
0.4
0.1
0.0
0.1
0.1 0.1
0.9 0.2
0.1
0.1 WEST SENECA APARTMENTS
0.0 0.5 0.8 1.0 0.6
0.0 0.1 0.2
0.0 0.1 2544 CLINTON ST,
0.1
0.1 0.1 0.1
0.1
0.0 WEST SENECA, NY 14224
0.1 0.8 0.7 0.2
0.1 0.2 0.5 0.7 0.4
0.1 0.1 0.2
0.0 0.2 0.1
0.0 0.2
0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.2 0.0
0.1
0.1 0.8 0.7 0.1
0.1 0.3 0.5 0.7 0.4
0.1 0.3 0.3
0.0 0.3 0.3 0.2 0.2
0.2 0.2 0.3 0.3
0.3 0.2 0.3 0.3 0.3 0.2 0.2 0.1 0.0
0.3 0.3 0.2 0.3 0.1
0.3 0.3 0.2 0.2 1.1 1.0 0.1
0.2 0.3 0.3 0.3 0.2 0.6 0.9 0.5
0.1 0.3 0.4 0.3 0.2 0.3
0.1 0.4
0.1 0.4 0.4 0.4
0.3 0.4 0.5 0.4
S
0.4 0.3 0.3 0.5 0.5 0.3 0.2 0.0
0.5 0.4 0.4 0.5 0.1
0.5 0.5 0.3 0.4 1.3 0.2
0.3 0.5 0.5 0.4 0.4 0.3 0.9 1.2 0.6
0.2 0.4 0.6 0.5 0.3 0.6
0.2 0.7 0.6 0.2 0.2
0.1 0.6 0.7 0.5 0.4 0.3 1 06/23/2026 PLANNING BOARD COMMENTS
0.5 0.6 0.7 0.6
0.5 0.5 0.7 0.8 0.1
0.6 0.5 0.6 0.7 0.1 NO: DATE: DESCRIPTION:
0.8 0.7 0.5 0.5 1.9 0.3
0.7 0.8 0.8 0.5 0.4 1.0 1.3 0.8
0.3 0.6 0.7 0.6 0.4 0.6
0.2 0.9 0.8 0.3 0.2 2.0 Revisions
0.1 0.8 0.9 0.9 0.5 0.4
0.7 0.7 0.8 0.7
0.1 0.6 0.6 1.0 0.9
0.8 0.7 0.8 0.9 1.0 0.2
1.0 0.9 0.6 0.7 2.5 0.5
B:\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Electrical\E100 SITE PLAN.dwg
1.0 1.1 0.6 0.6 1.1 1.5 0.9
0.4 0.8 0.9 0.8 0.7 0.4 0.6 S1 PROJECT NUMBER:
0.3 0.6 1.1 1.0 0.3 0.3 2.5
0.2 1.0 1.2 1.2 0.7 0.5
0.1 0.7 0.8 0.9
1.4 1.3 1.0 0.8 2241067
0.9 0.8 0.7 1.1 1.3 0.2
1.4 1.1 0.8 0.9 0.4
1.5 1.5 0.6 0.7 1.4 2.5
0.6 0.9 1.2 0.8 0.7 0.6 1.0 0.7
0.7 1.2 1.0 0.3 0.4 1.8 DRAWN BY:
0.4
1.5 1.6 1.5 0.5 0.4
0.2 1.0 1.3 1.0 0.8 EMM
KBB
/ JBB
0.1 0.8 0.9 1.6 1.3
0.9 0.8 1.4 1.6 1.7 0.1
1.3 1.0 0.9 1.1 0.2 REVIEWED BY:
1.7 1.6 0.7 0.8 1.3 1.7
0.6 1.5 1.7 0.9 0.7 0.6 1.0 0.3 SRVCCL
/ DPB
0.8 1.1 1.4 1.1 0.3 0.4 1.0
0.4 1.7 1.7 0.5 0.3
0.1 S2 1.5 1.7 S2 S2 0.7 0.6
0.1 0.4 0.5 1.1 1.7 0.8
0.5 0.4 1.7 1.8 ISSUED FOR:
0.7 0.5 0.9 1.1 1.6 0.1
0.9 0.7 1.1 0.1
0.4 1.1 1.5 1.7 1.8
1.0 0.5 0.4 0.3
0.5 0.7 1.0 1.2 0.2 SITE PLAN APPROVAL
0.4 0.8 1.7 1.4 0.7 0.5 0.6
0.3 1.7 1.7 1.2 0.9
0.2 1.1 1.5 1.5 1.3
0.8 0.8 1.0 1.7 1.7
1.0 0.9 1.5 1.7 0.0 DATE:
1.6 1.3 0.7 0.9 1.1 0.1
0.7 1.0 1.4 1.6 1.6
1.0 0.8 0.7 0.6
0.6 0.7 0.8 0.8
0.3
0.1 4/20/2026
0.5 0.8 1.5 1.2 0.9 0.7
0.3 1.3 1.5 1.6 1.4 1.2
0.2 0.9 1.0 1.4 1.3
0.7 0.8 1.6 1.5
0.9 0.8 1.0 1.3 1.5 0.0 DRAWING NAME:
1.3 1.1 0.7 0.8 0.0
1.3 1.4 0.6 0.6 0.7 0.6 0.1
0.7 0.9 1.1 0.8 0.7 0.8 0.8 0.2
0.5 1.1 1.0 1.2 1.0 0.4
0.3 1.2 1.2 1.6 1.4
0.2 0.8 0.9 1.0 1.2 1.3
0.6 0.7 1.1 1.1
0.8 0.7 0.9 1.1
1.0 0.9 0.6 0.7 0.8 0.0
0.9 1.0 1.0 0.5 0.5 0.7 0.6 0.1
0.6 0.8 0.8 0.7 0.6 1.1 0.9 0.2
0.5 0.9 0.9 1.5 1.3 0.3
0.4 0.8 0.9 1.6 1.7
0.2 0.6 0.7 0.9 0.9 1.2
0.5 0.5 0.8 0.9
0.6 0.5 0.6 0.7
0.7
0.7
0.3 0.9 0.9 1.0 0.9 0.8
0.6 0.7 0.6 0.6 0.5 0.5 0.4 0.4 0.5 0.5
2.2 2.4 1.8 1.3 1.1 0.9 0.6
0.4
0.2
0.1
0.0
SITE PHOTOMETRIC PLAN
0.5 0.6 0.8 1.3
0.3 1.4 1.4 0.4 0.5 0.6 0.6 0.6
2.4 2.1 1.1 0.7 0.5 0.5 0.4 0.4
0.3 0.3 0.3 0.3 0.4 0.5 0.5 S1
1.3 1.1 0.7
0.2
0.1
0.0 MATCH TO SHEET: E052
0.2 0.4 0.4 0.4 2.2 1.6
1.4 0.4 0.4 2.6 0.4
0.4 0.4 0.4 0.4 0.7
0.5 4.0 4.4 0.3 0.3 0.4 0.4
0.2 0.3 0.3 0.4 1.3 2.1
0.6 0.4 0.3 0.3 0.3 0.0
3.6 1.4 0.2 0.2 0.8 0.1
5.0 0.2 0.2 1.3 1.1 0.2
0.1 0.3 0.3 0.2 0.3 1.3 1.4 0.4
1.4 0.3 0.3 0.5
0.5 0.2 0.2 0.2
0.2 5.6 10.2 0.2 0.1 0.7
3.4 1.3 0.5
0.2 0.2 0.1 0.1 0.5 0.7 0.0
DRAWING NUMBER:
8.0 0.3 0.3 0.2 0.2 0.2 0.3 0.1
S3 0.5 0.2 0.2 1.1 0.9
1.9 0.2 0.2 0.2 0.2 0.5 0.8 1.1 0.2
0.7 0.2 0.2 0.2 0.5
0.2
6/23/2026 1:56:56 PM
N
1 SITE PHOTOMETRIC PLAN
E051 SCALE: 1" = 20'
E051
Page 654 of 1174
Page 655
0.8 0.9 0.7 0.6 1.1 0.9 0.2
0.5 0.6 0.9 0.8 1.5 1.3 0.3
0.4 0.9 0.9 1.6 1.7
0.8 1.2
NOT FOR CONSTRUCTION
0.2 0.5 0.6 0.7 0.9 0.9
0.5 0.5 0.8 0.9
0.7 0.6 0.6 0.7 0.0
0.9 0.8 0.4 0.5 0.5
0.9 1.0 0.5 0.4 0.9 0.6 0.1
0.9 0.6 0.5 1.3 1.1 0.2
0.3
0.7 0.6 2.4 1.8 0.4
0.7 0.6 0.6 0.8 1.3 2.2
0.3 1.4 1.4 0.5 0.5 0.6 0.6
0.4 0.6
2.4 2.1 1.1 0.7 0.5 0.5 0.4 0.4
0.3 0.3 0.3 0.3 0.4 0.5 0.5 S1
1.1 0.7 0.1
0.0 MATCH TO SHEET: E051
0.2 0.4 0.4 0.4 2.2 1.6 1.3 0.2
1.4 0.4 0.4 2.6 0.4
0.4 0.4 0.4 0.7
0.5 4.0 4.4 0.3 0.3 0.4 0.4 0.4
0.2 0.3 0.3 0.4 1.3 2.1
0.6 0.4 0.3 0.3 0.3 0.0 300 Pearl Street, Suite 130
3.6 1.4 0.2 0.2 0.8 0.1
5.0 0.2 0.2 1.3 1.1 0.2
0.1 0.3 0.2 0.3 1.3 1.4
0.5
1.4 0.2 0.3
0.3 0.3 0.5
0.4 Buffalo, NY 14202
0.2 5.6 10.2 0.2 0.2 0.1 0.2
8.0 3.4 1.3 0.5
0.3 0.2 0.2
0.2 0.1 0.1
0.3 0.5 0.7 0.7
0.0 716-551-6281
0.3 C0 0.2 0.2 0.9 0.1
1.9
S3 0.5
0.2 0.2 0.2
0.2 0.2 0.2
0.5 0.8 1.1 1.1 0.2
0.2 0.2 0.5
0.2
0.7 0.4 0.1 0.1 0.2
0.1 0.1 0.2 labellapc.com
0.1 0.5 0.1 0.1 0.1 0.3
0.7 0.1 0.1 0.1 0.1 0.4
1.3 0.2 0.2 0.1 0.1 0.1 0.2 0.1
1.5 0.1 0.1 1.2 1.2
0.4 0.1 0.1 0.1 0.6 0.9 0.2
0.1 0.1 0.1 0.1 0.3 0.6
0.1 0.1 0.1 0.1 0.1
0.0 0.2 0.1 0.1 0.2
0.2 0.1D S 0.1 0.1 0.2
0.4 0.1 0.1 0.1 0.1 0.1 0.1
0.3 0.1 0.1 0.8 1.2 1.5 0.3
0.2 0.1 0.1 0.1 0.1 0.3 0.5
0.1 0.1 0.1 0.7
0.0 0.1 0.1 0.0 0.1 1.8
0.0 0.1 0.0 0.0
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
0.1 0.0 0.1 0.1
0.1 0.0 0.1
0.0 0.0 0.1 2.1 0.2
0.1 0.0 0.0
0.5 1.0 1.3 0.5
0.0 0.0 0.0 0.2 0.9
0.0
0.0 0.0
0.0
0.0 0.0 0.0
0.1
S1 2.4
0.0 0.0 0.1 0.1
0.0 0.0 0.0 0.1 0.0
0.0 0.0 1.4 2.5 0.5
0.0 0.0 0.0 0.3 0.6 1.0 0.8
0.0 0.0 0.0 2.2
0.0 0.0 0.0 2.1
0.0 0.0 0.0 0.1
0.0 0.0 0.1 1.3
0.0 0.1 0.1
0.0 0.0 0.0
0.0 0.0 0.0 1.0 0.3
0.0 0.3 0.6 0.5
0.0 0.0 0.0 1.3
0.0 0.0 0.0 1.7 EXP: EXP:
0.0 0.0 0.0 0.1 0.2 1.3
0.0 0.1 0.1
0.0 0.0 0.1
0.0 0.0 0.0 1.0
0.0 0.0 0.4 0.7 0.2
0.0 0.0 0.7
0.0 0.0 0.0 1.2
0.0 0.0 0.0 1.2 CERTIFICATE OF AUTHORIZATION NUMBER:
0.0 0.1 0.2
0.0 0.0 DS
0.0 0.0 0.1 PROFESSIONAL ENGINEERING: 0021272
0.0 0.0 0.0 0.1
0.0 0.0 0.0 0.0 0.0 0.9 1.1 LAND SURVEYING: 0021271
0.0 0.0 0.5 0.7 0.4
0.0 0.0
0.0 0.0 0.8 GEOLOGICAL: 0021659
0.0 0.0 0.0 0.5 1.0
0.0 0.0 0.0 0.3 0.3 1.1
0.0 0.0 0.0 0.1 0.2
0.0 0.0 0.0 0.0 0.1 1.1
0.0 0.0 1.1 1.1
0.0 0.0 0.0 0.5
0.0 0.0 0.0 0.7 It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
0.0 0.0 0.0 0.9
0.0 0.0 0.7 0.9
0.0 0.0 0.0 0.2 0.4 Sec. 7307, for any person, unless acting under the direction of a licensed
0.0 0.0 0.1 0.1 1.2
0.0 0.1 1.7 1.3 architect, professional engineer, or land surveyor, to alter an item in any
0.0 0.0 0.0 C0 2.0
0.0 0.0 0.3 way. If an item bearing the seal of an architect, engineer, or land surveyor
0.0 0.0 0.0 0.5
0.0 0.0 0.0 1.1 2.3 0.7 is altered; the altering architect, engineer, or land surveyor shall affix to
0.0 0.0 0.0 0.5 0.9
0.0 0.2 0.2 S1
0.0 0.0 0.1 0.1 1.5 1.1 the item their seal and notation "altered by" followed by their signature and
0.1 0.1 0.1 2.5 2.4
0.0 0.0 0.1 0.3 date of such alteration, and a specific description of the alteration.
0.0 0.4 0.0 0.4
0.0 0.0 0.0
0.0 0.6 0.0 0.7 0.6
0.4 0.0 0.0 0.3 0.3 0.8
0.2 0.0 0.0 0.3 0.3 1.1 0.9
0.1 0.2 0.3 2.0 1.6 © 2024
2026 LaBella Associates
0.1 0.2 1.4
0.1 0.1 0.1
0.1 0.7 0.1 0.1 0.2
0.0 0.1 0.4
0.9 0.1 0.1 0.5 0.5 0.5
0.7 0.1 0.1 0.6 0.6 0.9 0.8
0.5 0.5 0.3 0.5 0.5 1.3 1.1
0.4 0.8 0.4 0.8 1.3
0.2 2.2 1.4 0.3 0.4 0.6
0.1 1.4 2.1 0.2 0.1
0.1 0.1 0.2 0.1
S1 0.1 0.1 0.1
0.5
0.3
0.2
0.1
0.2
0.4
0.7
1.0
1.4 1.8 2.3 2.0 1.5 1.0 0.6 0.3
0.2 0.3 0.5 0.6 0.7
0.9
0.8
1.0 1.0 1.0 1.0 0.8 0.7 0.8 1.1 1.0 0.8 0.7
0.1
HOME LEASING
0.2 0.2 0.1 75 S CLINTON AVE SUITE 700,
0.3 0.2 0.3
1.1 0.4
0.8 0.7 0.4 0.6 0.8 0.6 ROCHESTER, NEW YORK 14604
0.5 1.1 1.0 0.8 0.6 0.7
0.3 1.2 1.2 0.8 1.4 1.2
0.1 1.0 1.1 0.5 1.5 1.5
0.3 1.1 1.2 0.1
0.9
0.3 0.1
0.2 0.2 0.2 0.2
0.8 0.8 0.6 0.4 0.3
0.5 0.9 0.8 0.9 0.6 0.4
0.2 0.8 0.9 2.5 1.6 0.4
0.1 0.7 0.7 1.8 2.5 S1 0.3
1.0 1.3 0.3 0.0 Isoline Legend
0.3 0.5 0.6 0.4 0.0
0.2 0.3 0.7 0.1
0.5 0.4 0.3 0.2 1.2 0.1 Illuminance (Fc)
0.3 0.5 0.5 1.9 0.2
0.2 0.5 0.5 1.8 0.2 Value
0.1 0.4 0.4 0.4 0.2 Color
1.0 1.3
0.5 0.7 0.1
0.4 0.4 0.5 0.2 0.1
0.2 0.4 0.2 0.1
0.2 0.5 0.1 0.5
0.1 0.2 0.7 0.1
0.1 0.2 0.6 0.1
0.1 0.4
0.4 0.1 1
0.1 0.3 0.5 0.4 0.3 0.1
0.1 0.2 0.7 0.6 0.1
0.1 0.2 0.3
0.1 0.1 0.0 Calculation Summary
0.0 0.1 0.3
0.0 0.1 0.2
0.1 0.6 0.3 0.1 0.0 Label CalcType Units Avg Max Min Avg/Min Max/Min Max/Avg
C0
0.0 0.3 0.8 0.5 0.2 0.1
0.0 0.2 1.0 0.3 0.1 Parking Lot Illuminance Fc 0.86 5.0 0.0 N.A. N.A. 5.81
0.0 1.1 0.1
0.0 0.1 0.0
0.0 0.1 0.1
0.0 0.1 0.1
0.0 1.2 0.1
0.0 0.5 0.9 0.5 0.1
0.0 0.4 1.5 1.2 0.2
0.0 0.2 0.5
0.0 0.1 0.1 Luminaire Schedule
0.0 0.0 0.1
0.0 0.1
0.0 0.1 Symbol Tag Label Arrangement Description LLF Luminaire Luminaire Total Mounting BUG Rating
0.0 1.3 1.2 0.8 0.1
0.0 0.7 1.8 0.2 Lumens Watts Watts Height
0.1 .8 0.4
0.1 S1 2 S1 LITHONIA RSX1 LED P1 40K R3 Single RSX1 LED P1 40K R3 0.850 7096 51.34 718.76 20 B1-U0-G2
0.0
0.0
2.1 0.8 0.1 S2 LITHONIA RSX1 LED P1 40K R5 Back-Back RSX1 LED P1 40K R5 0.850 7284 51.34 410.72 20 B3-U0-G2
0.8 2.0 1.4 0.1
0.4 0.3 S3 LITHONIA RSX1 LED P1 40K R3 Single RSX1 LED P1 40K R3 0.850 7096 51.34 718.76 10 B1-U0-G2
0.1 0.7
0.0
0.0 WEST SENECA APARTMENTS
0.1
0.8 2.5 2.0 1.6 0.1 2544 CLINTON ST,
0.3 0.2
0.1 2.2 0.7 0.0
0.0 WEST SENECA, NY 14224
0.0
0.1
0.9 2.1 1.8 0.1
0.3 2.1 0.2
0.1 1.8 0.7
0.0 0.0
0.0
0.1
0.9 2.1 2.2 0.1
0.3 1.9 0.3
0.1 0.8
0.0 0.0
0.0
0.1
0.8 2.1 2.8 0.2
0.3 1.7 0.5
0.1 0.9
0.0 S1 2.5 0.0
0.0
0.0
0.7 1.9 3.0 0.0
0.3 1.4 0.5 1 06/23/2026 PLANNING BOARD COMMENTS
0.1 0.8
0.0 2.0 0.0
0.0 0.0 NO: DATE: DESCRIPTION:
0.1
0.7 1.6 2.2 0.1 Revisions
0.3 1.2 0.2
0.1 0.4
0.0 0.7 1.2 0.0
0.0 0.0
B:\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Electrical\E100 SITE PLAN.dwg
0.0 0.0
0.0 1.4 0.1 PROJECT NUMBER:
0.0 0.3 1.0 1.3 0.1
0.0
0.1 0.2 2241067
0.0 0.0
0.0 0.0
0.0 0.0
0.8 0.4 0.0 DRAWN BY:
0.0 0.3 0.6 0.9 1.0 0.1
0.0 0.1 EMM
KBB
/ JBB
0.0 0.0
0.0 0.0
0.0 0.0 REVIEWED BY:
0.0 0.1 0.0 SRVCCL
/ DPB
0.0 0.1 0.0
0.0 0.0 0.0
0.0 0.1
0.0 0.0 0.2 ISSUED FOR:
0.0 0.0 0.3
0.0 0.0 0.4 0.0 SITE PLAN APPROVAL
0.0 0.4 0.0
0.0 0.3 0.0
0.2 0.0
0.0 0.1
0.0 0.0 0.1 DATE:
0.0 0.2
0.0 0.2
0.0
0.0 0.0 0.2 4/20/2026
0.0 0.0 0.2
0.0 0.0 0.1
0.0 0.1
0.0 0.0 DRAWING NAME:
0.0 0.0
0.0 0.0 0.1
0.0 0.0 0.1
0.0 0.0 0.1
0.0 0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0 SITE PHOTOMETRIC PLAN
0.0
0.0
0.0
0.0
0.0
0.0
DRAWING NUMBER:
6/23/2026 1:57:28 PM
N
1 SITE PHOTOMETRIC PLAN
E052 SCALE: 1" = 20'
E052
Page 655 of 1174
Page 656
June 23, 2026
Jeffery Schieber
Code Enforcement Officer
1250 Union Road – Room 210
West Seneca, New York 14224
RE: 2544 Clinton Street – Home Leasing – West Seneca Apartments
Planning Board Submission – Additional Items for Review
Mr. Schieber:
On behalf of Home Leasing, we offer the following supplemental information and drawings
based on the feedback we received from meeting with at the June 11th Planning Board
meeting, and outstanding engineering comments (from the engineering comments from
CPL dated 5/8/2026).
Supplemental Drawings:
1. Landscaping Plans (sheets L401 – L403) per the Town of West Seneca Code are
provided for Planning Board review.
2. Site Photometric Plans (sheets E051 and E052) per the Town of West Seneca Code
are provided for Planning Board review. All proposed lights are downward facing,
night sky compliant with shielding (if needed).
3. Profile Views for Sanitary and Stormwater (sheets C303 and C304) per the Town of
West Seneca Code. Sketches SK-01-C305 and SK-02-C306 are also provided to
show each utility run and stationing correlating with the profile views.
Supplemental Data:
4. Pipe Sizing Calculation Sheets – calculation sheets for storm pipe sizing throughout
the site. Pipe sizes have been revised (as needed) to match the calculations for
conveyance of the 10-year storm event. Revised pipe sizes are shown the utility
plans on C305 and C306.
5. Pipe Sizing Drainage Map – Map correlating the site plan to the pipe runs in the
spreadsheets.
Attached with this submission are the following additional drawings to be added into the
set.
L401 – Planting Plan – Overall
L402 – Planting Plan -Enlargement 1
L403 – Planting Plan – Enlargement 2
E051 – Site Photometric Plan
Page 656 of 1174
Page 657
E052 – Site Photometric Plan
C303 – Storm Profiles
C304 – Storm Profiles
C305 – Utility Profile Legend
C306 - Utility Profile Legend
We look forward to presenting this project to the Planning Board on July 9th, 2026. If you
have any questions or need any additional information, please feel free to contact me at
585-770-2525 or [email protected].
Respectfully submitted,
LaBella Associates
Shelby Vakiener
Civil Engineer
2
Page 657 of 1174
Page 658
R S
6/23/2026 4:38:27 PM
NOIM=5 AN M
AC 94.9 H
CE 2
SS
N00° 32' 17"E 174.62'
S
KEYNOTE SCHEDULE
BO
S4
NO. Keynote Description
3°
TTO
42
'1
M
7"
1 TRANSFORMER PAD
E
OF
17
260 E Main St Suite 4000 Rochester, NY 14604
8.
B 2 GENERATOR
00
AN
'
585 232 8300 | [email protected]
K 3 EXISTING FENCE
SWBR NYS Certificate of
4 TRANSFORMER PAD Authorization #: 021723
5 STONE PIER TO MATCH FRONT WALL
BO 6 COLLAPSIBLE BOLLARDS FOR FIRE LANE ACCESS
FRA SUM
TTO
M 7 PLAYGROUND / COURTYARD
3 OF 8 STONE SEATWALL TO BE SIMILAR TO FRONT WALL
BAN
K 9 LIMITS OF ARCHAEOLOGICAL BUFFER AREA
CE
NT 10 EXISTING LAWN AREA WITH EXISTING TOPOGRAPHY
ER
48"
RC
P
L 11
BA INE 12
HAMMERHEAD TURNAROUND
S5 NK OF OUTDOOR SEATING
9°
29
'1
3"E 13 CONCRETE SEATING AREA
11
7.8
5' 14 PLAYGROUND / COURTYARD
TOP
OF
BAN
K
'
.72
SYR RET
139
MAL FLO
2
"E
2
' 38
° 31
P
CEL OCC
RC
N22
"
48
1
FRA MAS
1
7
R
NOIM=6 SAN
AC 02.5 MH
CE 1
SS
S
2
3
' 8
2.9
18
E "
10
2 7'
6°
N3
1
FRA MAS
2
CO GLE SKY
5 4
CO
FRA MAS
1 CEL OCC
4 FRA MAS
5
NK
BA E EK
OF CR 18
'
CEL OCC
GA
P
OM
7.
RC
11
YU
"
T
48
1
OT
"E
CA
7
'3
B
0
°5
45
N
NK NK
BA B A
OF OF
D
OM
S
T P
BO
T TO ACE RBR D
S
7039
1
600.16
LIGND
G
.41'
97
2"E
'5 PO
16 RC
H
8°
N5
CEL OCC ACE RBR
2
F
1
PLANT SCHEDULE
O
BA LINE
TIL GSP
SYMBOL QTY BOTANICAL NAME COMMON NAME REMARKS
NK
2
R
TE
TIL GSP Deciduous Trees
FILE PATH: Autodesk Docs://26054.00 Pennrose West Seneca Apartments/Pennrose West Seneca Apartments LA_R25.rvt
3
CEL OCC FRA SUM ACE RBR 10 Acer rubrum Red Maple
2 2
N18° 32' 09"E
49.86'
OR
IG
NO INAL
R ACE RBR
ACE SUG 1 Acer saccharum Sugar Maple
OF THER
WV
CL WAY LY R
INT
ON LINE
STR OF
EET
IGH
T 1 CEL OCC 9 Celtis occidentalis Common Hackberry
FRA SUM FRA MAS 9 Fraxinus pennsylvanica `Marshall`s Seedless` Marshall`s Seedless Green Ash
WV ACE RBR 2
2 FRA SUM 10 Fraxinus pennsylvanica `Summit` Summit Green Ash
ACE RBR
GLE SKY 5 Gleditsia triacanthos inermis `Skyline` Skyline Honey Locust
N69
° 30
' 45
"W
2
MAL FLO 2 Malus floribunda Flowering Crabapple
Drawn By: RC/DK
NYS
EG
494
SYR RET 2 Syringa reticulata Japanese Tree Lilac Checked By: ES
303
.36'
NO
# TIL GSP 5 Tilia cordata `Greenspire` Greenspire Littleleaf Linden Project Manager:
0"W
'5
45
These documents and all the ideas, arrangements,
9°
Evergreen Shrubs designs and plans indicated thereon or presented
S2
thereby are owned by and remain the property of
FRA SUM SWBR and no part thereof shall be utilized by any
3
BUX WME 49 Buxus x `Gold Gem` Gold Gem Boxwood person, firm, or corporation for any purpose
whatsoever except with the specific written
JUN SK2 30 Juniperus scopulorum `Skyrocket` Skyrocket Juniper permission of SWBR. All rights reserved. ©
Revisions
1-1/4"
ON
E
GAR STO
AGE RY Shrubs
FF= FRAM
PIPE
ABE DIS 113 Abeliophyllum distichum White Forsythia
WV 601 E
.19
'
494
/3 14 N6
S60° 14' 10"E
88.00' COR GR2 59 Cornus racemosa Gray Dogwood
8
0°
1 4'
10"W COR SI6 5 Cornus alba `Siberian Pearls` Siberian Pearls Tatarian Dogwood
3'
20.
DIE LON 37 Diervilla lonicera Bush Honeysuckle
WO
CLI
O D
22. GAZ
E
N
5' BO
(WID TON S HAM XIN 69 Hamamelis x `Rochester` Rochester Witch Hazel
0'
1.0
TR
AP
TH PR
VIB DEN 35 Viburnum dentatum `Arrowwood` Arrowwood Viburnum
VAR EET
13
OX
IMA
TE
L OC
IES)
AT #2
VIB L2 39 Viburnum lentago Nannyberry
ION 561
12"
PV
0'
CW 16.
Project Name
1.0
AT 5'
ER
13
MA
IN
'
9.7
25 4.0
SWBR Project Number 26054.00
7.6 '
2'
TW
6'
FRA O ST
'
6.6
46.
M OR
APPR
OXIM FFE E HOU 2Y.0'
ATE 605 SE
LOC
ATIO .33'
N 4
" GA
S M
AP
PR
G
Owner
4'
AIN NYS OX
30.
EG
40 IMA 22.
TE 5'
0"W
L OC
AT
'5
ION
45
6" C
AS
9°
T IR
S2
ON
WA
TE
RM
L-401
AIN
10485
603.38
MB N60° 14' 10"W
MB
88.00'
APP
RO
PLANTING PLAN -
XIM
ATE
LOC
ATIO
N
OVERALL
2"
GAS
MA
IN
N
0 40' 80' 120'
OVERALL PLANTING PlAN 2026-06-23
1 1" = 40'-0" PLANNING BOARD
SCALE: 1" = 40'
ISSUANCE
Page 658 of 1174
Page 659
CO
CO
6/23/2026 4:38:29 PM
PLANT SCHEDULE PLANT SCHEDULE
SYMBOL QTY BOTANICAL NAME COMMON NAME REMARKS SYMBOL QTY BOTANICAL NAME COMMON NAME REMARKS
Deciduous Trees Evergreen Shrubs
ACE RBR 10 Acer rubrum Red Maple BUX WME 49 Buxus x `Gold Gem` Gold Gem Boxwood 260 E Main St Suite 4000 Rochester, NY 14604
585 232 8300 | [email protected]
ACE SUG 1 Acer saccharum Sugar Maple JUN SK2 30 Juniperus scopulorum `Skyrocket` Skyrocket Juniper
CEL OCC NK9 Celtis occidentalis Common Hackberry
SWBR NYS Certificate of
BA
Authorization #: 021723
FRA MAS 9
E K
Fraxinus pennsylvanica `Marshall`s Seedless` Marshall`s Seedless Green Ash Shrubs
E
OF
FRA SUM 10
CR
Fraxinus pennsylvanica `Summit` Summit Green Ash
8'
ABE DIS 113 Abeliophyllum distichum White Forsythia
P
OM
GLE SKY 5
A
Gleditsia triacanthos inermis `Skyline` Skyline Honey Locust 17.1 COR GR2 59 Cornus racemosa Gray Dogwood
RC
G 1
"
T U
48
MAL FLO 2 Malus floribunda Flowering Crabapple"E COR SI6 5 Cornus alba `Siberian Pearls` Siberian Pearls Tatarian Dogwood
OT SYR RET 2 AY Syringa reticulata Japanese Tree Lilac 37 DIE LON 37 Diervilla lonicera Bush Honeysuckle
B TIL GSP 5C Tilia cordata `Greenspire` N
45
° 5
Greenspire Littleleaf
0'
Linden HAM XIN 69 Hamamelis x `Rochester` Rochester Witch Hazel
21
VIB DEN 35 Viburnum dentatum `Arrowwood` Arrowwood Viburnum B/2 STOR
NK K RIC Y FR
A N VIB L2 39 Viburnum lentago Nannyberry KH AM
#2 OUS E &
B B A FFE 544
602
E
OF
.53'
OF
D
S
OM P
T T T O
B O D
S
7039
600.16
LIGND
G
.4 1'
97
"E
' 52 PO
° 16 RC
H
N 58
N18° 32' 09"E
49.86' OR
I
NO GINAL
R
OF THER
CL WAY LY R
INT
ON LINE IGHT
WV STR OF
EET
WV
N69
° 30'
45"
W
NYS
E G
494
NO
303 #
.36'
0"W
'5
45
9°
FILE PATH: Autodesk Docs://26054.00 Pennrose West Seneca Apartments/Pennrose West Seneca Apartments LA_R25.rvt
S2
Drawn By: RC / DK
ON Checked By: ES
E
1-1/4" GAR STO
AGE RY Project Manager:
FF= FRAM
WV PIPE 60TheseE
1.1 documents and all the ideas, arrangements,
9' and plans indicated thereon or presented
designs
thereby are owned by and remain the property of
SWBR and no part thereof shall be utilized by any
person, firm, or corporation for any purpose
S60°
whatsoever except with 14' 10"E
the specific written
permission of SWBR. All rights reserved. ©
494
88.00'
/3
8 N6
0°
14 Revisions
'1
0"W
3'
20.
KEYNOTE SCHEDULE WO
CLI
OD
22. GAZ
EB
NTO
5'
NO. Keynote Description O
1 TRANSFORMER PAD
(WID N S
0'
2 GENERATOR
1.0
AP
3 EXISTING FENCE
TH TRE PR
O
13
XIM
VAR ET
4 TRANSFORMER PAD AT
E LO
5 STONE PIER TO MATCH FRONT WALL CA
IES)
6 COLLAPSIBLE BOLLARDS FOR FIRE LANE ACCESS TIO #2
561
N1
2" P Project Name
7 PLAYGROUND / COURTYARD VC
0'
W 16. SWBR Project Number 26054.00
1.0
8 STONE SEATWALL TO BE SIMILAR TO FRONT WALL AT 5'
ER
13
9 LIMITS OF ARCHAEOLOGICAL BUFFER AREA MA
IN
'
9.7
10 EXISTING LAWN AREA WITH EXISTING TOPOGRAPHY
11 HAMMERHEAD TURNAROUND 25 4.0 Owner
12 OUTDOOR SEATING 7.6 '
2'
13 CONCRETE SEATING AREA TW
6'
FRA O ST
'
6.6
46.
14 PLAYGROUND / COURTYARD M O
APPR FFE E HOU R2Y.0'
L-402
OXIM 605 SE
ATE .33'
LOC
ATIO
N 4 AP
" GA PR
S M
G
4'
AIN NYS OX
30.
EG IM AT 22.
40 5'
E
0"W
LO
CA
TIO PLANTING PLAN
'5
N6
45
"C
AS
T IR ENLARGEMENT 1
9°
ON
S2
WA
TE
RM
N
AIN 0 20' 40' 60'
2026-06-23
SITE PLAN ENLARGEMENT - ENTRANCE AND DRIVEWAY / PARKING
1 1" = 20'-0" SCALE: 1" = 20'
PLANNING BOARD
ISSUANCE
Page 659 of 1174
10485
Page 660
BO
3°
TTO
N00
42
'1
M
7"
E
OF
17
6/23/2026 4:38:35 PM
8.
BA
00
NK
'
PLANT SCHEDULE PLANT SCHEDULE
SYMBOL QTY BOTANICAL NAME COMMON NAME REMARKS SYMBOL QTY BOTANICAL NAME COMMON NAME REMARKS
260 E Main St Suite 4000 Rochester, NY 14604
Deciduous Trees Evergreen Shrubs 585 232 8300 | [email protected]
ACE RBR 10 Acer rubrum Red Maple BUX WME 49 Buxus x `Gold Gem` Gold Gem Boxwood
BO SWBR NYS Certificate of
TTO
Authorization #: 021723
ACE SUG 1 Acer saccharum Sugar Maple JUN SK2 30 Juniperus scopulorum `Skyrocket` Skyrocket Juniper
CEL OCC 9 Celtis occidentalis Common Hackberry
M
FRA MAS 9 Fraxinus pennsylvanica `Marshall`s Seedless` Marshall`s Seedless Green Ash Shrubs OF
FRA SUM 10 Fraxinus pennsylvanica `Summit` Summit Green Ash ABE DIS 113 Abeliophyllum distichum White Forsythia B AN
GLE SKY
MAL FLO
5
2
Gleditsia triacanthos inermis `Skyline`
Malus floribunda
Skyline Honey Locust
Flowering Crabapple
COR GR2
COR SI6
59
5
Cornus racemosa
Cornus alba `Siberian Pearls`
Gray Dogwood
Siberian Pearls Tatarian Dogwood
K
SYR RET 2 Syringa reticulata Japanese Tree Lilac DIE LON 37 Diervilla lonicera Bush Honeysuckle
TIL GSP 5 Tilia cordata `Greenspire` Greenspire Littleleaf Linden HAM XIN 69 Hamamelis x `Rochester` Rochester Witch Hazel 48"
RC
P
VIB DEN 35 Viburnum dentatum `Arrowwood` Arrowwood Viburnum
VIB L2 39 Viburnum lentago Nannyberry S5
9°
29
'1
3"E
11
7.8
5'
TOP
OF
COR GR2
B ANK
VIB DEN
'
.72
3
1
139 COR GR2 VIB L2 3
3
"E
VIB DEN VIB DEN
' 38
2 1
° 31
P
COR GR2
RC
5
N22
"
48
COR GR2
9
ABE DIS
5
VIB DEN HAM XIN
3 4
ABE DIS
VIB L2 5 4
VIB DEN
1
COR GR2
5 COR GR2 BUX WME
3 6
JUN SK2 VIB DEN
3 VIB L2 6 3
DIE LON DIE LON VIB DEN ABE DIS
2 4 1 6
HAM XIN
3 HAM XIN
1
VIB L2 2 ABE DIS
ABE DIS 3
JUN SK2
5 2 HAM XIN
HAM XIN 4
3
JUN SK2
4 HAM XIN
ABE DIS 3
2 BUX WME
VIB L2 6 3
ABE DIS HAM XIN
'
.98
9 3
2
BUX WME
18
HAM XIN
3 3
FILE PATH: Autodesk Docs://26054.00 Pennrose West Seneca Apartments/Pennrose West Seneca Apartments LA_R25.rvt
"E
HAM XIN
10
JUN SK2
5
'
4
27
ABE DIS
6°
N3
2
HAM XIN ABE DIS
3 2
JUN SK2
1
VIB L2 2
ABE DIS
JUN SK2 Drawn By: RC/DK
2
2
JUN SK2 Checked By: ES
BUX WME
1 HAM XIN
CO ABE DIS
4
5 Project Manager:
ABE DIS
2 VIB DEN
2 These documents and all the ideas, arrangements,
1 designs and plans indicated thereon or presented
VIB L2 1 HAM XIN thereby are owned by and remain the property of
CO ABE DIS 6
SWBR and no part thereof shall be utilized by any
person, firm, or corporation for any purpose
whatsoever except with the specific written
2 ABE DIS permission of SWBR. All rights reserved. ©
19
Revisions
P
RC
Project Name
SWBR Project Number 26054.00
Owner
L-403
D
S
PLANTING PLAN
D
S
7039
600.16
ENLARGEMENT 2
LIGND
FF
FF 600 E
602 E .70'
N
G
.53'
SITE PLAN ENLARGEMENT - PLAYGROUND / COURTYARD / PARKING LOT 1 0 20' 40' 60'
2026-06-23
1 1" = 20'-0" PLANNING BOARD
PO
RC
H SCALE: 1" = 20' ISSUANCE
Page 660 of 1174
Page 661
ENGINEERING.ARCHITECTURE.ENVIRONMENTAL.PLANNING
300 State Street, Suite 201 ● Rochester, NY 14614
Phone 585.454.6110 ● Fax 585.454.3066
www.labellapc.com
Project: West Seneca Apartments
Project No.: 2241067
Subject Pipe Sizing Calculations
Calc By: JB
Date: 6/15/2026
Catchment # Total (Acre) Weighted Value
Pervious (SF) Impervious (SF)
COLUMN C COLUMN D COLUMN E
1 ST-3.4 816.00 8,177.00 0.21 0.84
2 ST-3.3 300.00 4,946.00 0.12 0.86
3 ST-3.2 3,905.00 12,827.00 0.38 0.74
4.1 CHAM 0.00 7,189.00 0.17 0.90
5 ST-3.1 1,198.00 17,386.00 0.43 0.85
6 ST-2.1 760.00 15,654.00 0.38 0.87
7 ST-2.2 548.00 6,725.00 0.17 0.85
8 ST-6.1 41,805.00 0.00 0.96 0.20
4.2 ST-3.0 0.00 7,189.00 0.17 0.90
4.3 ST-3.3 0.00 4,388.00 0.10 0.90
4.4 ST-3.4 0.00 6,627.00 0.15 0.90
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
0.00 #DIV/0!
Totals for System
48516 SF 82931 SF
Catchment 3.02 Acres
1.11 Acres 1.9 Acres
Page 661 of 1174
Page 662
ENGINEERING.ARCHITECTURE.ENVIRONMENTAL.PLANNING Job # 2241067
300 State Street, Suite 201 ● Rochester, NY 14614 Project: West Seneca Apartments
Phone 585.454.6110 ● Fax 585.454.3066 Date: 6/15/2026
www.labellapc.com By: JB
Location: West Seneca, NY
Design Storm Event: 10-Year
Roughness Coefficient, N = 0.013
Storm Sewer Sizing Calculations, Run 01
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
ST-3.4 ST-3.3 1 ST-3.4 0.21 0.84 0.17 0.31 6.00 12.19 3.77 18 150 0.90% 0.67 5.7 0.44 1.50 1.767 4.712 0.375 9.99 PASS
ST-3.3 ST-3.2 2 ST-3.3 0.12 0.86 0.10 0.50 10.00 9.52 4.80 18 102 0.90% 0.85 5.7 0.30 1.50 1.767 4.712 0.375 9.99 PASS
ST-3.2 ST-3.1 3 ST-3.2 0.38 0.74 0.28 0.79 10.30 9.37 7.38 18 85 2.00% 0.88 8.4 0.17 1.50 1.767 4.712 0.375 14.90 PASS
ST-3.1 ST-3.0 5 ST-3.1 0.43 0.85 0.36 1.15 10.47 9.30 10.70 18 35 1.30% 1.58 6.8 0.09 1.50 1.767 4.712 0.375 12.01 PASS
#N/A #N/A #N/A #N/A 10.55 9.26 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 1.15 Ac
Next Tc = 10.55 Min.
Storm Sewer Sizing Calculations, Run 02
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
ST-2.2 ST-2.1 7 ST-2.2 0.17 0.85 0.14 0.14 5.00 13.19 1.87 12 50 2.00% 0.29 6.4 0.13 1.00 0.785 3.142 0.250 5.05 PASS
ST-2.1 CHAM 6 ST-2.1 0.38 0.87 0.33 0.47 5.13 13.05 6.11 18 30 1.83% 0.76 8.1 0.06 1.50 1.767 4.712 0.375 14.25 PASS
#N/A #N/A #N/A #N/A 5.19 12.98 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.47 Ac
Next Tc = 5.19 Min.
Storm Sewer Sizing Calculations, Run 03
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
BLDG CHAM 4.1 CHAM 0.17 0.90 0.15 0.15 5.00 13.19 1.96 10 206 1.25% 0.43 4.5 0.76 0.83 0.545 2.618 0.208 2.46 PASS
#N/A #N/A #N/A #N/A 5.76 12.41 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.15 Ac
Next Tc = 5.76 Min.
Page 662 of 1174
Page 663
Storm Sewer Sizing Calculations, Run 04
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
SWALE ST-6.1 8 ST-6.1 0.96 0.20 0.19 0.19 30.00 5.05 0.97 12 177 1.00% 0.21 4.5 0.65 1.00 0.785 3.142 0.250 3.57 PASS
#N/A #N/A #N/A #N/A 30.65 4.98 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.19 Ac
Next Tc = 30.65 Min.
Storm Sewer Sizing Calculations, Run 05
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
AREA 4.2 ST-3.0 4.2 ST-3.0 0.17 0.90 0.15 0.17 5.00 13.19 2.18 10 209 1.00% 0.54 4.0 0.86 0.83 0.545 2.618 0.208 2.20 PASS
#N/A #N/A #N/A #N/A 5.86 12.31 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.17 Ac
Next Tc = 5.86 Min.
Storm Sewer Sizing Calculations, Run 06
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
AREA 4.3 AREA 2 4.3 ST-3.3 0.10 0.90 0.09 0.09 5.00 13.19 1.20 10 26 3.38% 0.16 7.4 0.06 0.83 0.545 2.618 0.208 4.04 PASS
#N/A #N/A #N/A #N/A 5.06 13.12 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.09 Ac
Next Tc = 5.06 Min.
Page 663 of 1174
Page 664
Storm Sewer Sizing Calculations, Run 07
Area Time of Pipe Pipe Pipe Partially Velocity Time of Pipe Pipe Wetted Hydraulic Qmax
From To Area Coefficient Equivalent Accum. Intensity Q = CIA
Number Concentration Dia. Length Slope Full Pipe at Reqd. Flow Dia. Area Perimeter Radius (Full Pipe)
ST ST (see map) (Ac) of Runoff Area (Ac) Area (Ac) (min) (in/hr) (cfs) (in.) (ft) (%) Area (sf) (fps) (min) (ft) (sf) (ft) (ft) (cfs)
AREA 4.4 AREA 3.4 4.4 ST-3.4 0.15 0.90 0.14 0.14 5.00 13.19 1.81 10 26 1.00% 0.45 4.0 0.11 0.83 0.545 2.618 0.208 2.20 PASS
#N/A #N/A #N/A #N/A 5.11 13.07 #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 0.000 0.000 #DIV/0! #DIV/0! #DIV/0!
Contributing Area = 0.14 Ac
Next Tc = 5.11 Min.
Page 664 of 1174
Page 665
' 39
169.
S43
° 42
' 17"
E 1
41"E
78.0
593.19
0'
° 55'
S59° 29' 13"E 117.85'
N45
600.14
ST
ST
602.49
602.51
594.95
594.92
C0
UD ST UD UD UD
ST UD C
600
60
0
N0
0°
C
NEW PRIVATE
FIRE HYDRANT
32
'1
7"E
FS
ST
17
4.6
600
AREA 4.4
2'
AREA 1
C0
FS
600
NEW 6" FIRE SERVICE
600
(AFTER BACKFLOW
PREVENTOR)
ST-3.4
ST
PROPOSED
PLAYGROUND ST-3.4
FS
ST
AREA 4.3
NEW BACKFLOW PREVENTOR (IN
FS
ST
MECHANICAL ROOM) FOR COMBINED
AREA 4.2
SERVICE. DOMESTIC SERVICE WILL BE
AREA 4.1 PROPOSED
3-STORY
METERED AFTER THE BACKFLOW.
ST-3.3 AREA 2
C0
N22° 31'
CHAM BUILDING
± 25,000 SF FOOTPRINT
ST-3.0
ST-3.3C
38"E 13
C0
C0 C0
C0
ST ST ST
C0
ST
C0
ST ST ST ST
SA
600
SA
ST
9.72'
SA
ST
ST
SA S
SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA SA
SA
ST
AREA 7 AREA 3
ST
ST
SA
599
599
ST-2.2
600
ST-3.2
SA
ST
599 D D
599
AREA 6 AREA 5
59
SA
ST
ST
9
599
C ST C
ST-2.1 ST-3.1 C
ST ST ST C
SA
ST ST ST ST D D
599
SA
RIM=599.00 599 NEW 6" COMBINED
8'
WATER SERVICE
NEW PRIVATE
0"E 182.9
FIRE HYDRANT
SA
600
FS
NEW 6" FIRE SERVICE 600
N36° 27' 1
(AFTER BACKFLOW
598
599
598
599
PREVENTOR)
599
DS
596.55
594.04
DS
NEW BACKFLOW PREVENTOR
(IN MECHANICAL ROOM) FOR
598
COMBINED SERVICE.
597
59987
DOMESTIC SERVICE WILL BE
S29° 45' 50"W
METERED AFTER THE
5
600
BACKFLOW.
C0
UD
5 9987 UD
5596.50
5 9 6 UD UD
60 UD UD
5 95966.50
18'
C
0
NEW 6" COMBINED 5 9978
5
117.
WATER SERVICE ST
ST
600
S60° 14' 10"E
37"E
ST
ST 598
88.00'
° 50'
59
9 59796
D
ST 599.84
ST 5 6
ST
AREA 8 59978
15.7'
N45
ST
ST 59
ST
ST
5
598
ST
ST 598 NEW 6" COMBINED
131.00'
WATER SERVICE
C0
UD UD UD
596
595
UD UD UD
C
ST-6.1
595
131.00'
C
598.87 9
59
'
.41
595.50
S29° 45' 50"W
596
97
598
598
597
596
595
595
59 6
5987
59
T
2"E
ST ST ST ST ST ST D
ST ST ST ST ST ST C
'5
16
598
8°
N5
N60° 14' 10"W
N60° 14' 10"W 257.62' 88.00'
N18° 32' 09"E 303.36'
CONNECT TO EXISTING 6"
49.86' ' 45"W
WATERMAIN WITH TS&V
N69° 30
N
WEST SENECA APARTMENTS DATE: 06/23/2026
SITE PIPE SIZING CONTRIBUTING AREAS SCALE: 1"=40'
Page 665 of 1174
Page 666
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
620 620
labellapc.com
620 620
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
610 610 610 610
610 610
ST-4.0 24"x24"
RIM=598.00
NE INV=594.58 ST-6.0 4' DIA. ST-5.2 24"x24" ST-5.0 4' DIA.
NW INV=594.58 NEW 6" COMBINED RIM=598.30 RIM=596.01 RIM=598.95
PROPOSED
WATER SERVICE NW INV=590.00 W INV=592.58 PROPOSED NW INV=591.20
GRADE
600 600 600 SE INV=590.10 600 E INV=592.58 GRADE E INV=591.92
EXISITNG EXP: EXP:
EXISITNG 600 S INV=591.30 600
GRADE
NEW GAS MAIN (REFER TO GRADE
± 75LF 12" SICPP
@ 1.43% MECHANICAL DRAWINGS) NEW 6" COMBINED
CERTIFICATE OF AUTHORIZATION NUMBER:
WATER SERVICE PROFESSIONAL ENGINEERING: 0021272
END SECTION ± 179LF 12" SICPP @ 0.9 LAND SURVEYING: 0021271
8% ± 134LF 12" SICPP @ 0.49%
INV=593.50 GEOLOGICAL: 0021659
590 590 ± 169LF 12" SICP
590 P @ 1.48% 590 ± 217LF 12" SICPP @ 1.0
1%
ST-6.1 24"x24"
RIM=594.35
590 590
NW INV=591.85 END SECTION It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
END SECTION Sec. 7307, for any person, unless acting under the direction of a licensed
INV=587.50
INV=589.00 architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
580 580 580 580 the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
580 580
© 2026
2024 LaBella Associates
570 570 570 570
570 570
HOME LEASING
599.08
599.08
598.73
598.73
588.29
588.29
599.39
599.39
599.48
599.48
598.74
598.74
598.18
598.18
598.40
598.40
597.24
597.24
594.08
594.08
592.69
592.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
593.61
593.61
597.45
597.45
596.94
596.94
598.80
598.80
599.27
599.27
598.76
598.76
598.33
598.33
595.40
595.40
585.47
585.47
75 S CLINTON AVE SUITE 700,
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ROCHESTER, NEW YORK 14604
0+00 0+50 0+95.42 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 3+77.01
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 3+70.49
5 E STORM 4 D STORM 3 C STORM
C303 SCALE: H: 1" = 40' V: 1"=8' C303 SCALE: H: 1" = 40' V: 1"=8' C303 SCALE: H: 1" = 40' V: 1"=8'
620 620
WEST SENECA APARTMENTS
610 610 2544 CLINTON ST,
WEST SENECA, NY 14224
ST-3.0 4' DIA. ST-1.0
ST-3.3 24"x24" ST-3.1 24"x24" RIM=599.33
610 610 ST-3.4 24"x24" ST-3.2 24"x24"
RIM=598.89
ST-1.1 4' DIA. ADS BARRACUDA MAX S6 WQU
RIM=599.62 RIM=599.74 RIM=598.47 PROPOSED NW INV=593.00 RIM=599.04 RIM=599.00
EXISITNG N INV=593.46
ST-2.2 24"x24" ST-2.0 4' DIA. SW INV=597.32 ± 82LF 18" SICPP @ 0.89% SW INV=595.86 NW INV=594.90 GRADE S INV=593.10 NW INV=590.30 E INV=590.20
NE INV=595.96
GRADE SE INV=593.56 NE INV=593.20
RIM=598.62 RIM=599.29 NE INV=595.00 SE INV=590.40 W INV=590.20
SE INV=594.77 SE INV=593.10 600 600
W INV=593.20
ST-2.1 24"x24" ± 104LF 18" SICPP @ 0.82% 4" SANITARY SEWER
RIM=598.87 ± 86LF 18" SICP
P @ 1.56% CROSSING
600 E INV=593.40 600 ± 44LF 18" SICPP @ 0.89% TOP OF PIPE EL:595.88
NW INV=593.50 ± 27LF 18" SICPP @ 0.89%
1 06/23/2026 PLANNING BOARD COMMENTS
18" MIN.
NEW 6" COMBINED ± 122LF 12" SICPP @ 0.37% NO: DATE: DESCRIPTION:
± 36LF 18" SICPP @ 1.00%
590 590
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
WATER SERVICE Revisions
± 5LF 18" SICPP @ 2.02% ADS STORMTECH CHAMBER ± 9LF 12" SICPP @ 1.15%
± 51LF 12" SICPP @ 2.48% END SECTION
SYSTEM SC-3500 ± 5LF 12" SICPP @ 2.01% INV=589.75
4" SANITARY SEWER (120 CHAMBERS) PROJECT NUMBER:
590 CROSSING 590 STONE INV=590.50 2241067
TOP OF PIPE EL:595.73 CHAMBER
± 31LF 18" SICPP @ 0.65% ELEVATION=591.25 DRAWN BY:
EMM / JBB
ADS STORMTECH CHAMBER 580 580
REVIEWED BY:
SYSTEM SC-3500 SRV / DPB
(120 CHAMBERS)
STONE INV=590.50 ISSUED FOR:
580 580 SITE PLAN APPROVAL
CHAMBER ELEVATION=591.25
594.39
594.39
596.20
596.20
598.66
598.66
598.68
598.68
DATE:
0.00
0.00
0.00
0.00
570 570 4/20/2026
DRAWING NAME:
599.61
599.61
599.77
599.77
599.78
599.78
599.58
599.58
599.89
599.89
599.93
599.93
599.90
599.90
599.98
599.98
599.03
599.03
598.27
598.27
594.54
594.54
587.19
587.19
600.27
600.27
600.04
600.04
595.06
595.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0+00 0+50 1+00 1+05.60
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 6+89.48
STORM PROFILES
2 B STORM 1 A STORM
C303 SCALE: H: 1" = 40' V: 1"=8' C303 SCALE: H: 1" = 40' V: 1"=8'
DRAWING NUMBER:
6/23/2026 1:47:37 PM
C303
Page 666 of 1174
Page 667
NOT FOR CONSTRUCTION
300 Pearl Street, Suite 130
Buffalo, NY 14202
716-551-6281
labellapc.com
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
EXP: EXP:
CERTIFICATE OF AUTHORIZATION NUMBER:
PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
GEOLOGICAL: 0021659
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
Sec. 7307, for any person, unless acting under the direction of a licensed
architect, professional engineer, or land surveyor, to alter an item in any
way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
date of such alteration, and a specific description of the alteration.
© 2026
2024 LaBella Associates
620 620
PROPOSED BUILDING
HOME LEASING
620 620 75 S CLINTON AVE SUITE 700,
610 610 ROCHESTER, NEW YORK 14604
CONNECTION TO EXISTING
48" SANITARY SEWER AT
±INV=585.70
EXISTING BUILDING APPROXIMATE BASED ON
PROPOSED FFE=600.75 EXISITNG PROPOSED RECORD MAPPING
610 610 GRADE GRADE
600 600
EXISTING FFE=600.70 SAN 1.0 4' DIA.
RIM=599.80 ±242' 6" PVC SDR-21 @ 1.00%
PROPOSED
NW INV=592.69
GRADE
SE INV=592.72 ±25' 6" PVC SDR-21 @ 1.00%
EXISITNG S INV=593.99
GRADE
600 600 BUILDING 10" STORM 10" STORM
590 INV=595.75 SEWER CROSSING SEWER CROSSING 590
±123' 4" PVC TOP OF PIPE EL:594.48 TOP OF PIPE EL:593.28
SDR-21 @ 2.
00%
SAN 1.0 4' DIA.
RIM=599.80
±12' 4" PVC SDR-21 @ 2.00% INTERIOR DROP NW INV=587.00
BUILDING SE INV=592.72
590 18" STORM 590
INV=596.70 S INV=593.99
SEWER CROSSING 580 580
TOP OF PIPE EL:594.88 ±45' 6" PVC SDR-21 @ 2.88%
12" STORM
SEWER CROSSING EXISTING 48" SANITARY SEWER
WEST SENECA APARTMENTS
TOP OF PIPE EL:591.17 2544 CLINTON ST,
WEST SENECA, NY 14224
580 580
570 570
598.65
598.65
598.25
598.25
596.10
596.10
594.48
594.48
594.44
594.44
0.00
0.00
0.00
0.00
0.00
599.61
599.61
598.11
598.11
594.81
594.81
594.51
594.51
598.79
598.79
594.55
594.55
599.30
599.30
599.50
599.50
599.20
599.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0+00 0+50 1+00 1+50 1+55.70
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 3+68.23
1 06/23/2026 PLANNING BOARD COMMENTS
NO: DATE: DESCRIPTION:
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
1 B SANITARY 1 A SANITARY Revisions
C304 SCALE: H: 1" = 40' V: 1"=8' C304 SCALE: H: 1" = 40' V: 1"=8'
PROJECT NUMBER:
2241067
DRAWN BY:
EMM / JBB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
SITE PLAN APPROVAL
DATE:
4/20/2026
DRAWING NAME:
SANITARY PROFILES
DRAWING NUMBER:
6/23/2026 1:47:39 PM
C304
Page 667 of 1174
Page 668
NOT FOR CONSTRUCTION
ST
599
ST
MATCH TO INSET
E STORM 0+95
300 Pearl Street, Suite 130
598
ST
Buffalo, NY 14202
RIPRAP OUTLET 716-551-6281
CONTROL (TYP.) ST-4.0
599 24"X24" CB labellapc.com
ST
END SECTION 600 RIM=598.00
INV= 593.50 600
599
598
600
ST
C0
UD UD
ST UD UD ST UD UD UD
ST UD UD ST UD UD C
NEW 2' WIDE
E STORM 0+00
GRAVEL DIAPHRAGM
600.14
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
ST
NEW BIORETENTION
± 75LF 12" SICPP @ 1.43%
599
AREA #1 (± 375 SF)
600
ST
ST
EXP: EXP:
N
A STORM 0+00
CERTIFICATE OF AUTHORIZATION NUMBER:
2 INSET 60
0 PROFESSIONAL ENGINEERING: 0021272
LAND SURVEYING: 0021271
C305 SCALE: 1"=20' GEOLOGICAL: 0021659
C
NEW PRIVATE
FIRE HYDRANT
It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
FS
Sec. 7307, for any person, unless acting under the direction of a licensed
ST
ST-3.4
24"X24" CB architect, professional engineer, or land surveyor, to alter an item in any
PROFILE LEGEND RIM=599.62 way. If an item bearing the seal of an architect, engineer, or land surveyor
is altered; the altering architect, engineer, or land surveyor shall affix to
the item their seal and notation "altered by" followed by their signature and
ST
A STORM
FS
date of such alteration, and a specific description of the alteration.
B STORM
© 2026
2024 LaBella Associates
ST
C STORM
FS
600
C0
CLEANOUT ST
D STORM SE INV=597.26
NEW 6" FIRE SERVICE
600
G
600
(AFTER BACKFLOW
ST
E STORM PREVENTOR)
HOME LEASING
FS
PROPOSED
G
75 S CLINTON AVE SUITE 700,
A SANITARY
ROCHESTER, NEW YORK 14604
ST
PLAYGROUND
G
B SANITARY
FS
G
ST
A STORM 1+00
G
FS
ST
G
FS
ST
G
NEW BACKFLOW PREVENTOR (IN FS
MECHANICAL ROOM) FOR COMBINED
W W
G
SERVICE. DOMESTIC SERVICE WILL BE
PROPOSED
595
ST
METERED AFTER THE BACKFLOW.
W
G
3-STORY
596
CLEANOUT C0
ST
SE INV=596.51
597
BUILDING
G
W
598
ST
± 25,000 SF FOOTPRINT
G
CLEANOUT CLEANOUT BLDG INV=
BLDG INV= CLEANOUT CLEANOUT
FFE=600.75' WEST SENECA APARTMENTS
A SANITARY 0+00
NW INV=593.50 SW INV=593.90 SW INV=595.75
SW INV=595.08 SW INV=592.75 SE INV=594.38
G
NW INV=593.90
W
NW INV=592.75
99
CLEANOUT
SE INV=592.75
SE INV=593.90 C
2544 CLINTON ST,
SE5 INV=594.00 ST-3.3 WEST SENECA, NY 14224
G
C0 C0 24"X24" CB
600 C0 C0 C0 ST ST
C0 ST ST ST ST ST ST ST ST
SA
ST ST ST ST ST ST ST ST ST ST RIM=599.74
ST
1
W
60
G
SA
600
CONNECT INTO CLEANOUT
ST
B SA
SA
C0
EXISTING NW INV=594.85
NITA
ST
SANITARY MAIN
SA
SAN CO
G
SAN CO
ST
A SANIT
RY 1
ARY 3+ SA TYP.
6 8 SA TYP. C0
W
C0
SA SA
ST
+56
600
A STORM 2+00
SA
SA
G
SA S SA SA SA SA SA SA SA SA SA SA SA SA SA SA C0
SA SA SA SA SA SA SA SA SA SA SA
ST
SA SA SA SA SA SA SA SA
A SANITARY 3+00 A SANITARY 2+00 SAN CO
CLEANOUT
ST
INV=594.41 A SANITARY 1+00
SAN 1.0 4' DIA.
SA
RIM=593.62 TYP. SAN CO 1 06/23/2026 PLANNING BOARD COMMENTS
G
ST
RIM=594.70 C0
WYE THRU NW INV=593.08 TYP.
W
NO: DATE: DESCRIPTION:
NW INV=587.00 SE INV=593.08
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
SA
ST
SE INV=592.72 Revisions
G
E INV=593.08
ST
S INV=593.99
595
SA
ST
ST-2.0
4' DIA. MH PROJECT NUMBER:
G
596
W
2241067
ST
RIM=599.29
SA
ST
597
ST-3.0
599
599
4' DIA. MH
G
DRAWN BY:
ST
B SA
600
598
RIM=599.33 EMM / JBB
SA
NITA
REVIEWED BY:
W
B STORM 1+00
ST
SRV / DPB
G
RY 1
B STORM 1+06
599
599
SA
D D
599
+
M 4+00 ISSUED FOR:
A STOR
00
ST-1.1
SITE PLAN APPROVAL
G
ST
SA
ST
59
4' DIA. MH
9
ST
W
ST-2.2 RIM=599.04
DATE:
SA
24"X24" CB ST
G
ST
599 4/20/2026
RIM=598.62
B STORM 0+00
RIPRAP OUTLET SAN CO +00
ST ST ST TORM 5
SA
C C
CONTROL (TYP.) TYP. AS C ST ST ST ST ST ST C
DRAWING NAME:
G
ST ST ST ST ST ST ST ST ST C0 D D
A STORM 3+00
W
A STORM 6+89 A STORM 6+00 ST-3.2
SA
ST-2.1 ST-3.1 24"X24" CB
END SECTION
G
24"X24" CB 24"X24" CB RIM=598.47
INV= 589.75 ST-1.0
SA
599 RIM=598.87 RIM=598.89
ADS BARRACUDA MAX S6 WQU
ADS STORMTECH CHAMBER
W
G
RIM=599.00 599 NEW 6" COMBINED
SA
NEW PRIVATE
SYSTEM SC-3500
(120 CHAMBERS)
WATER SERVICE UTILITY PROFILE LEGEND
FIRE HYDRANT
G
SA
MATCH TO SHEET: C302
W
SA
G
FS
600
G
DRAWING NUMBER:
W
SA
C0
G
600
UTILITY PLAN NOTES:
6/23/2026 3:35:31 PM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PROFILE LEGEND 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C305
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C305 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 668 of 1174
Page 669
SA
599 RIM=598.87 RIM=598.89
ADS BARRACUDA MAX S6 WQU 24
NOT FOR CONSTRUCTION
ADS STORMTECH CHAMBER
W
G
RIM=599.00 599 NEW 6" COMBINED
SA
SYSTEM SC-3500 WATER SERVICE
NEW PRIVATE
(120 CHAMBERS)
FIRE HYDRANT
G
SA
MATCH TO SHEET: C301
W
SA
G
300 Pearl Street, Suite 130
FS
600 Buffalo, NY 14202
G
716-551-6281
W
SA
PROFILE LEGEND ±12' 4" PVC SDR-21 @ 2.00% C0
G
SAN CO NEW 6" FIRE SERVICE 600 labellapc.com
B SANITARY 0+00
A STORM
FS
TYP. (AFTER BACKFLOW
G
PREVENTOR)
598
W
599
598
599
B STORM BLDG INV=
599
DS
NE INV=596.70
G
C STORM
C:\Users\EMerkley\Documents\KJW Stamp-jpeg.jpg
W
G
D STORM
E STORM
G
W
A SANITARY
G
B SANITARY EXP: EXP:
G
W
CERTIFICATE OF AUTHORIZATION NUMBER:
G
DS PROFESSIONAL ENGINEERING: 0021272
NEW BACKFLOW PREVENTOR LAND SURVEYING: 0021271
598 G
(IN MECHANICAL ROOM) FOR GEOLOGICAL: 0021659
W
COMBINED SERVICE.
597
DOMESTIC SERVICE WILL BE
597
NEW 2' WIDE
G
598
METERED AFTER THE GRAVEL DIAPHRAGM It is a violation of New York Education Law Art. 145 Sec. 7209 & Art. 147
BACKFLOW. NEW BIORETENTION G Sec. 7307, for any person, unless acting under the direction of a licensed
600
W
AREA #2 (± 370 SF) C0 architect, professional engineer, or land surveyor, to alter an item in any
G
UD
way. If an item bearing the seal of an architect, engineer, or land surveyor
ST-5.2
G is altered; the altering architect, engineer, or land surveyor shall affix to
24"X24" CB 599 UD W
the item their seal and notation "altered by" followed by their signature and
RIM=596.01 598 UD G
597 UD date of such alteration, and a specific description of the alteration.
596.50 UD W G
596 UD
UD
UD UD G © 2026
2024 LaBella Associates
UD00 UD
UD 0+
60 UD M W
TOR
C
5 9 6 .50
W
0 CS G
596 7
ST 59
NEW 6" COMBINED 598 G
ST
W
WATER SERVICE
G
ST
W W W W W W W W W W W
HOME LEASING
T
W G
ST
600 G
ST 75 S CLINTON AVE SUITE 700,
ST-5.0 ST W G ROCHESTER, NEW YORK 14604
4' DIA. MH ST 0
RIM=598.95 1+0 G
RM
ST C ST
O W 598
G
ST
G
W
59 597
T
D
ST 9
G
596
ST
ST
ST
ST
ST W G 6
C STORM 2+00 59 7
ST
ST
ST
ST
ST 59 8
RIPRAP OUTLET ST
ST G 59
598
ST ST-5.1
ST 598 NEW 6" COMBINED W
CONTROL (TYP.)
ST
ST C STORM 3+00 NEW 2' WIDE G
24"X24" CB WATER SERVICE
ST
GRAVEL DIAPHRAGM 596 RIM=596.10
C STORM 3+70 W
G PROPOSED SWALE
END SECTION 595 460 LF @ 1.0%
UD UD C G
UD UD UD UD BOTTOM WIDTH 1' MIN.
INV= 589.00 C0
UD UD UD UD
UD UD
G
T
UD
W
UD
UD
UD
UD
G
595 ST ES-5 ST
SE INV=585.58 W G
NEW BIORETENTION
G
C
AREA #3 (± 700 SF)
G
9
59
W
ST-5.3
G
595.50 24"X24" CB
596 RIM=598.85 WEST SENECA APARTMENTS
T
G
598
2544 CLINTON ST,
5 98
597
596
W
595
595
596
597
WEST SENECA, NY 14224
598
RIPRAP OUTLET
G
CONTROL (TYP.) ST ST ST ST ST ST ST ST ST ST ST C
ST ST ST ST ST ST ST ST ST ST ST ST D ST ST
D STORM 2+00 D STORM 1+00 D STORM 0+00
D STORM 3+68 D STORM 3+00
END SECTION
W
G
ST-6.0 ST-6.1
T
INV= 587.50
4' DIA. MH 30"X30" CB
RIM=598.30 RIM=594.35
598
G
W
G
1 06/23/2026 PLANNING BOARD COMMENTS
G
T
NO: DATE: DESCRIPTION:
W
\\cash.lab\P\GLOBAL\Projects\Home Leasing Services\2241067 - Affordable Housing West Seneca\06_Drawings\Civil\C300 UTILITY PLAN.dwg
Revisions
G
PROJECT NUMBER:
2241067
G
W
DRAWN BY:
EMM / JBB
REVIEWED BY:
SRV / DPB
ISSUED FOR:
CONNECT TO EXISTING 6" SITE PLAN APPROVAL
WATERMAIN WITH TS&V
DATE:
4/20/2026
DRAWING NAME:
UTILITY PROFILE LEGEND
DRAWING NUMBER:
UTILITY PLAN NOTES:
6/23/2026 3:35:37 PM
1. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18" OF VERTICAL SEPARATION
N MUST BE MAINTAINED BETWEEN ALL SANITARY AND WATER SERVICES
1 UTILITY PROFILE LEGEND 0' 20' 40' 60' 2. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A MINIMUM OF
C306
48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE
C306 SCALE: 1" = 20' 3. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM,
SANITARY) THAT CROSS THROUGH ANY PAVEMENT AREA
Page 669 of 1174
Page 670
ENGINEER’S REPORT
for
West Seneca Exchange
Former Seneca Mall, SE corner of Orchard Park Rd & Slade Ave
0 Orchard Park Road
West Seneca, Erie County, NY
Prepared for
Benchmark Streamline, LLC
4053 Maple Road
Amherst NY, 14226
Prepared by
Carmina Wood Design
80 Silo City Row, Suite 100
Buffalo, NY 14203
Telephone: (716) 842-3165
Fax: (716) 842-0263
July 2026
Page 670 of 1174
Page 671
Page 671 of 1174
Page 672
Table of Contents
Written Engineer’s Report
Section 1 - Location & Description
Section 2 - Water Service
Section 3 - Sanitary Sewer Service
Section 4 - Storm Sewer Service
Appendices
Appendix A Sanitary Sewer and Water Demand Calculations
• Hydrant Flow Test Data
Appendix B Storm Sewer System Drainage Calculations
• Existing Runoff
• Proposed Runoff
o Green Infrastructure & Water Quality Calculation
Page 672 of 1174
Page 673
Page 673 of 1174
Page 674
Section 1 - Location & Description
This project consists of the first phase of the redevelopment of the approximately 56 acre former Seneca
Mall property, located within the area bounded by Slade Avenue, Ridge Road, and Orchard Park Road in the
Town of West Seneca. The proposed redevelopment includes construction of an approximately 158,000
square foot commercial building to be occupied by Costco Wholesale, along with associated parking,
utilities, stormwater management facilities, and other supporting site improvements. This phase also
includes the primary infrastructure necessary to accommodate future phases and the ultimate full build out
of the redevelopment site.
Proposed site improvements include upgrades to the existing utility infrastructure, construction of a new
internal roadway network, parking facilities, site lighting, landscaping, and stormwater management
system designed for the full build out. These improvements are intended to provide the framework required
for future development throughout the remainder of the property.
The project site is currently occupied by the remnants of the former Seneca Mall and the existing Tops
Market grocery store. The Tops Market will remain operational throughout construction and will not be
impacted by the proposed redevelopment. Construction activities associated with the redevelopment are
expected to result in approximately 27.71 acres of land disturbance.
Section 2 - Water Service
Water service for the proposed Seneca Mall redevelopment will be provided by a new private 8-inch
combined water service main connected to an existing 24-inch Erie County Water Authority (ECWA) water
main located within the northbound travel lane of Slade Avenue. The proposed water distribution system
will consist of 8 & 10-inch AWWA C900 water main and will be designed to accommodate both domestic
water demand and fire protection requirements for the development. Proposed and future buildings within
the redevelopment will be served by separate 6-inch polyethylene combined water services connected to
the proposed private water main system. The water distribution infrastructure has been designed to
support the phased development of the site while providing adequate domestic and fire flow capacity for
the ultimate build out condition.
The proposed 8-inch water main will extend into a dedicated insulated enclosure housing the water meter
and backflow prevention equipment. This enclosure will contain a reduced pressure zone (RPZ) backflow
preventer and will be heated to prevent freezing during winter conditions.
Discharge resulting from RPZ testing, maintenance, or relief valve operation will be conveyed by gravity to
the nearest drainage inlet. The property owner will be responsible for maintaining the drainage conveyance
system and ensuring that all drainage ports remain free of snow, ice, and debris to allow proper operation.
Water service within the apartment buildings will be utilized for typical domestic purposes, including
potable water supply and fire protection.
Four private hydrants will be installed on site as part of the development to ensure fire hose coverage not
exceeding 400’.
Domestic Summary:
Peak Operating Demand: 168.38 gpm
Water Main: 24” on Slade Avenue
Static Pressure: 90 psi (Per ECWA)
Friction Loss: 0.0 psi
Loss through meter/RPZ: 13 psi
Elevation Loss: 12.99 psi
Pressure after RPZ: 77.0 psi
Repairs to all devices will be made during off hours, dual backflow preventers are not required. The site is
not located in a 100-year flood plain. Disinfection of the water service following installation will be
continuous feed, according to AWWA C-651, latest revision.
West Seneca Exchange
07/20/2026
1 of 3
Page 674 of 1174
Page 675
Section 3 - Sanitary Sewer Service
Sanitary sewer service for the proposed Seneca Mall redevelopment will be provided by a private sanitary
sewer collection system consisting of 8 inch and 10 inch sanitary sewer mains, with manholes installed at all
changes in alignment and at appropriate intervals in accordance with Town of West Seneca and Erie County
standards. The proposed sanitary sewer system has been designed to accommodate both the initial phase of
development and future build out of the site.
Individual proposed and future buildings within the redevelopment will be connected to the private sanitary
sewer system through separate 6 inch SDR 35 PVC sanitary service laterals installed at a minimum slope of
1.0 percent. The sanitary collection infrastructure has been designed to provide adequate capacity for the
anticipated wastewater flows associated with the ultimate development of the property.
Design Parameters
0.1 gal/d/sf x 241,000 sf = 24,100 gpd
500 gal/d/wind. x 4 wind. = 2,000 gpd
25 gal/d/seat x 222 seats = 5,550 gpd
0.1 gal/d/sf x 120,025 sf = 12,003 gpd
15.0 gal/d/Employ. x 5 Employ. = 75 gpd
35 gal/d/seat x 500 seats = 17,500 gpd
Total Sanitary Sewer Demand = 61,228 gpd
61,228 gpd * 3.93 = 240,462 gpd *use peaking factor of 3.93
The hydraulic loading rate is per “Design Standards for Intermediate Sized Wastewater Treatment Systems”
2014, NYSDEC.
See Appendix A for detailed Calculations
Section 4 - Storm Sewer Service
Existing site drainage generally flows to two primary drainage areas. The western portion of the site drains
toward Slade Avenue, while the remainder of the site is collected by an existing network of catch basins
that ultimately discharge through a large storm sewer outlet located near the north central portion of the
site. This outlet conveys runoff directly to Cazenovia Creek.
Stormwater runoff generated by the proposed redevelopment will be collected and conveyed through a
stormwater management system consisting of a wet pond, catch basins, yard drains, manholes, and smooth
interior HDPE storm sewer pipe. The proposed stormwater management infrastructure has been designed to
accommodate the ultimate full build out of the site and will provide the necessary conveyance, water
quality treatment, and peak flow attenuation for future development phases.
As a redevelopment project, the site is required to provide Water Quality Volume (WQv) treatment for 25
percent of the disturbed impervious area and 100 percent of any new impervious area in accordance with
NYSDEC requirements. The existing site contains approximately 47.80 acres of impervious cover, while the
proposed redevelopment will result in approximately 47.0 acres of impervious cover which includes the
widening of Slade Ave and Orchard Park road. Since the project does not create any new impervious area,
all proposed improvements are classified as disturbed impervious area and are therefore subject to the 25
percent WQv treatment requirement. Because no new impervious cover is being created, no Runoff
Reduction Volume (RRv) is required for the project.
The proposed wet pond provides 100 percent of the required Water Quality Volume (WQv) treatment for
the redevelopment and also provides peak flow attenuation. Discharge from the wet pond is controlled
West Seneca Exchange
07/20/2026
2 of 3
Page 675 of 1174
Page 676
through a 48 inch outlet pipe that connects to the existing storm sewer outlet system and ultimately
discharges to Cazenovia Creek. The stormwater management facilities have been designed to satisfy the
requirements of both the Town of West Seneca and the NYSDEC. The overall stormwater management
system, including water quality treatment and peak flow control, has been designed in accordance with
Chapters 4 and 9 of the NYSDEC Stormwater Management Design Manual.
Wet Pond Summary:
Top of basin elevation = 614.50
Permanent pool elevation = 607.80
Bottom of basin elevation = 601.80
100-year storm storage volume = 283,293 cf @ 612.22
Water Quality Summary:
WQv req’d = 46,210 cf (1.061 ac-ft)
RRv min. req’d = 0 cf (0 ac-ft)
WQv provided – Wet Pond = 46,210 cf (1.061 ac-ft)
WQv provided – 46,210 cf = WQv provided = 46,210 cf
Note: Since the proposed redevelopment results in a net decrease in impervious area, no Runoff Reduction
Volume (RRv) is required. All new impervious surfaces associated with the project are classified as
disturbed impervious areas. The proposed wet pond has been designed to provide stormwater treatment for
the ultimate full buildout condition of the site.
Total Runoff Summary:
Event Ex. Runoff (cfs) Pro. Runoff (cfs) Result (cfs)
1-year 103.89 38.71 -65.18
10-year 184.66 87.97 -96.69
25-year 229.09 109.83 -119.26
100-year 317.14 141.36 -175.78
West Seneca Exchange
07/20/2026
3 of 3
Page 676 of 1174
Page 677
Page 677 of 1174
Page 678
Appendix A
Sanitary Sewer and Water Demand Calculations
Page 678 of 1174
Page 679
Page 679 of 1174
Page 680
CARMINA WOOD DESIGN Project No.: 24-4113 Date: 7/13/2026
80 SILO CITY ROW, SUITE 100 Project Name: West Seneca Exchange
BUFFALO, NEW YORK, 14203 Project Address: Orchard Park Rd West Seneca, NY
(716) 842-3165 Subject: Sanitary Sewer & Water Demand Calcs
FAX (716) 842-0263 Sheet: 1 of 3
Sanitary Sewage Demand Calculations:
0.1 gal/d/sf x 241,000 sf = 24,100 gpd *use 0.1 gallons per sq. ft. per day (shopping center)
500 gal/d/wind. x 4 wind. = 2,000 gpd *use 500 gallons per drive thru window per day
25 gal/d/seat x 222 seats = 5,550 gpd *use 25 gallons per seat per day (fast food)
0.1 gal/d/sf x 120,025 sf = 12,003 gpd *use 0.1 gallons per sq. ft. per day (retail)
15.0 gal/d/Employ. x 5 Employ. = 75 gpd *use 0.1 gallons per sq. ft. per day (retail)
35 gal/d/seat x 500 seats = 17,500 gpd *use 25 gallons per seat per day (Ordinary Restraunt)
Total Site Sanitary Demand: = 61,228 gpd
* The hydraulic loading rate is per “Design Standards for Intermediate Sized Wastewater Treatment Systems” 2014, NYSDEC
Find Peak Sanitary Demand:
Peaking Factor based on Population:
Total demand: 61,228 gpd / 100 gpcd = 612 per capita
Population (P) = 612 people
Peaking Factor : (18 +√P) / (4 + √P ) where P is in thousands
Peaking Factor = 3.93
Peak Sanitary Demand = 61,228 x 3.93 = 240,462 gpd
= 0.240 MGD
= 0.372 cfs
Peak Sanitary Flow = 240,462 gpd = 167.0 gpm
4:1 offset flow per NYSDEC requirements = 167.0 x 4 = 667.9 gpm req'd
Required Infiltration and Inflow Mitigation:
Mitigation Credit = $2.40 / gpd of average daily demand
Mitigation Agreement Amount = $146,946.00
Page 680 of 1174
Page 681
Page 681 of 1174
Page 682
ST
OP
OP
ST
15
20
24
25
25
FUT
25
25 U RE 1
28 80,3 -STORY
00 S RE
29
P O
ST
.F. TAIL
29
29
29
29
29
29
29
29
SITE 2
18
(RETAIL)
28
29
28
29
13
SITE 3
28 29
13 28
29
13
29
SITE 9 WHO PROPO
16
13 29
(FAST FOOD)
13
LE SED
-BW
158 SALE R
-BW
76
STOP
-BW
76
STOP
-BW
76
,000 ETA
(RETAIL)
76
13 SF IL
8
O
SITE 8
PATI
FUT
UR
STOP 130 E RETA
9,10 'x70' IL
STOP
(BANK)
FUTU 10
8
0 SF
REST RE DR
STOP
AURA IVE- 8
SITE 1
NT 4, THRU
IO
TION
PAT
963
CAU
SF
STOP
13
STOP
STOP
SITE 4 (COSTCO)
STOP
CAU
TION
STOP
9
7
CAU
GV
TION
FU
2,50 TURE
(FAST FOOD)
TION
CAU
0
BAN G.S.F.
5 STOP FU
K 27 RESTTURE D
16
11 AURA RIVE
NT 2, -THRU
TION
CAU
9
380
STOP
5
12 STOP SF
STOP
CAU
TION
STOP
5
CAU
13
STOP
TION
STOP
STOP 29
TION
CAU
20
FU
REST TURE DR
STOP
9 19
6 AURA IVE- 8
STOP
NT, THRU
18
2,30 7
0 SF
CAU
TION
17
1
TION
6
STOP 2
CAU
10 16
3
GV
11
25
STOP
5
5
STOP STOP 15 12
4
SITE 10,11,12 & 13
STOP
15
13
23 23 14
21
CAU
22
TION
CAU
TION
TION
19
(RETAIL)
CAU
19
TION
STOP
SITE 5
CAU
SITE 6
17
18
STOP
16
STOP 17
STOP
13
(FAST FOOD)
CAU
12 15
ST
TION
14
(RETAIL)
STOP
STOP
ST
TION
CAU
12
PROPOSED STORMWATER
ST
ST
MANAGEMENT AREA
FU
STOP STOP STOP STOP 2,92 TURE
STOP 5
RET G.S.F.
STOP STOP STOP STOP STOP
AIL
ST
STOP
STOP
5
STOP
STOP
ST
STOP
STOP
ST 4
STOP
14
18
FU
ST ST RESTTURE D
ST AURA RIVE
STOP
FUTURE RETAIL FUTURE RETAIL FUTURE RETAIL
NT 2, -THRU
STOP
110'x200' FUTURE RETAIL 380
SF
110'x200' 110'x200' 110'x200' 10
22,000 SF 22,000 SF 22,000 SF
12
10 STOP 9
22,000 SF
FUTURE
RESTAURANT FUTURE RETAIL FUTURE RETAIL
100'x100' 100'x100' 13
100'x100'
10,000 SF
10 10
10,000 SF 10,000 SF
EX. OFFICE
7,980 SF SITE 7
(FAST FOOD)
STOP 10 10
STOP
ST ST ST
STOP
SITE 16 GV
SITE 14 & 15
(RESTRAUNT) (RETAIL)
SANITARY BREAKDOWN MAP NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
SCALE: 1"=250' 250 0 250 500Ft.
250'
Page 682 of 1174
Page 683
Page 683 of 1174
Page 684
CARMINA WOOD DESIGN Project No.: 24-4113 Date: 7/13/2026
80 SILO CITY ROW, SUITE 100 Project Name: West Seneca Exchange
BUFFALO, NEW YORK, 14203 Project Address: Orchard Park Road West Seneca, NY
(716) 842-3165 Subject: Sanitary Sewer & Water Demand Calcs
FAX (716) 842-0263 Sheet: 2 of 3
Sanitary Sewage Demand Calculations:
Site 1 (Costco)
0.1 gal/d/sf x 158,000 sf = 15,800 gpd *use 0.1 gallons per sq. ft. per day (shopping center)
Site 2 (Retail)
0.1 gal/d/sf x 83,000 sf = 8,300 gpd *use 0.1 gallons per sq. ft. per day (shopping center)
Site 3 (Fast Food)
500 gal/d/wind. x 1 wind. = 500 gpd *use 500 gallons per drive thru window per day
25 gal/d/seat x 50 seats = 1,250 gpd *use 25 gallons per seat per day (fast food)
Site 4 (Fast Food)
500 gal/d/wind. x 1 wind. = 500 gpd *use 500 gallons per drive thru window per day
25 gal/d/seat x 50 seats = 1,250 gpd *use 25 gallons per seat per day (fast food)
Site 5 (Fast Food)
500 gal/d/wind. x 1 wind. = 500 gpd *use 500 gallons per drive thru window per day
25 gal/d/seat x 60 seats = 1,500 gpd *use 25 gallons per seat per day (fast food)
Site 6 (Retail)
0.1 gal/d/sf x 2,925 sf = 293 gpd *use 0.1 gallons per sq. ft. per day (retail)
Site 7 (Fast Food)
500 gal/d/wind. x 1 wind. = 500 gpd *use 500 gallons per drive thru window per day
25 gal/d/seat x 62 seats = 1,550 gpd *use 25 gallons per seat per day (fast food)
Site 8 (Bank)
15 gal/d/Employee x 5 Employ. = 75 gpd *use 15 gallons per Employee per day
Site 9 (Retail)
0.1 gal/d/sf x 9,100 sf = 910 gpd *use 0.1 gallons per sq. ft. per day (retail)
Site 10 (Retail)
0.1 gal/d/sf x 22,000 sf = 2,200 gpd *use 0.1 gallons per sq. ft. per day (retail)
Site 11 (Retail)
0.1 gal/d/sf x 22,000 sf = 2,200 gpd *use 0.1 gallons per sq. ft. per day (retail)
Site 12 (Retail)
0.1 gal/d/sf x 22,000 sf = 2,200 gpd *use 0.1 gallons per sq. ft. per day (retail)
Site 13 (Retail)
0.1 gal/d/sf x 22,000 sf = 2,200 gpd *use 0.1 gallons per sq. ft. per day (retail)
Site 14 (Retail)
0.1 gal/d/sf x 10,000 sf = 1,000 gpd *use 0.1 gallons per sq. ft. per day (retail)
Site 15 (Retail)
0.1 gal/d/sf x 10,000 sf = 1,000 gpd *use 0.1 gallons per sq. ft. per day (retail)
Site 16 (Restraunt)
35.0 gal/d/seat x 500 seats = 17,500 gpd *use 35 gallons per seat per day (restraunt)
Total Site Sanitary Demand: = 61,228 gpd
Page 684 of 1174
Page 685
CARMINA WOOD DESIGN Project No.: 24-4113 Date: 7/13/2026
80 SILO CITY ROW, SUITE 100 Project Name: West Seneca Exchange
BUFFALO, NEW YORK, 14203 Project Address: Orchard Park Road West Seneca, NY
(716) 842-3165 Subject: Sanitary Sewer & Water Demand Calcs
FAX (716) 842-0263 Sheet: 3 of 3
Water Demand Calculations (domestic):
Proposed Shopping Center Development
61,228 gpd x 1.1 = 67,350 gpd *use 110% of sewage demand
*use 1.8 peaking factor and assume a 12 hour day
67,350 gpm x 1day/12hr x 1hr/60min = 93.54 gpm
93.54 gpm x 1.8 = 168.38 gpm Qpeak
Headlosses:
Qpeak = 168.38 gpm
Pipe = 8 inch Polyethylene C = 140
Length = 50 LF (approx. distance from tap to RPZ)
10.44 L Q1.85 10.44(50)(27.89) 1.85
HL = 1.85 4.866 = = 0.03 ft = 0.01 psi
C D (140)1.85 (8)4.866
Δ elev = 0 ft = 0.00 psi
Loss through meter = 1 psi
Loss through RPZ = 12 psi
Total Losses = 13.0 psi
Static Pressure = 90 psi (per ECWA)
Residual Pressure Following RPZ = 40 - 13.0 = 77.0 psi (available after rpz & meter)
Residual Pressure 30" above 2nd Floor
Δ elev = 15 ft = 6.50 psi
Residual Pressure 30" above 2nd Floor = 70.5 psi *
Water Demand Calculations (fire):
Proposed Shopping Center Development
Q= 1,000 gpd
Headlosses:
Qpeak = 1168 gpm
Pipe = 10 inch C-900 PVC C = 140
Length = 1,300 LF (approx. distance from RPZ to farthest hydrant)
10.44 L Q1.85 10.44(1300)(1168)
1.85
HL = 1.85 4.866 = 1.85 4.866 = 9.36 ft = 4.05 psi
C D (140) (8)
Δ elev = 4 ft = 1.73 psi
Static Pressure after RPZ = 77.0 psi
Residual Pressure at hydrant = 77 - 5.8 = 71.2 psi
Page 685 of 1174
Page 686
Hydrant Flow Test Data
Page 686 of 1174
Page 687
Page 687 of 1174
Page 688
!
SLADE AVE & RIDGE RD., WSTN
<
´
M
¬J13A64 5B 2983
<
[
! !
! ¬
S
!
J13A64B X3B 2987
!
¬
¬
J13A64B 2G
REAR-2987 3045
!
¬
! !!! %'MM
310 J13F01 4B
M
315
J13A64
[¬
¬
! 24 350
"C REAR-370
REAR-315 (<! ast I
675-679 705 J13F01 3U( ron
[ Pip
!
!
J13F01A 2P
M
e
370
J13E08 !
J13F03 1B J13F06 1B
SOUTH
%
!
197
SLADE AVE
! !
193
5086
J13F12 2GS
181
164 A 174 J13F12 1P J13F13 1G
!
175
<
M
172 171 [
!
¬
12
!
! !
l
¬
"C
tee
!
J13E16 2GSJ13E16 1SV
162 M as 550 550
S
tI
90 PSI
<
!!
ro
(
<
J13E16 4GS!
16"
! ¬
n
e
Pi
Pip
!
%
160 pe
158 J13E16 FLOW
n
%! <!
!
US
164 B HYDRANT
Iro
154 ¬
e
<
!
144 J13F14A 1AR
Pip
tile
139
HW
140 )
uc
on
135
24" Cast Iron Pipe
132
J13F23 4B
D
M
Ir
126
Y 21
123
24"
ast
!
120
C
116 119 355
115
16"
9
110
24" Cast Iron Pipe
104
%
!
100 J13F20 1AR
RESIDUAL
I 90
98 ) ¬J13F20 5B
96 HYDRANT !J13F20 9AR
)
96 99-101
80 SOUTH
76 SOUTH
1900
70 J13F28 9BJ13F28 10B 1810 Legend:
66 ¬
J13F28 6B 1980
J13E32A 1GS J13E32A 2P
!¬! Parcels
) ¬
!
e
Pip 1900
60 <![
% '
! !
US HWY
J13E32A J13E32 1SV
on
I 90
t Ir
J13F28A 1GS
!
(
as
1956
"C
!
<
1940
16
J13E40 1B
24" Cast Iron Pipe
S
¬ J13E40 2BO 1910
24" Cast Iron Pipe
2
!
19
J13F34A 1P
e
e
Iron Pip
Pip
st K
!
12" C a
<
[
!
M M <
J13F39 2GS
!
J13F37 1G
!
!
n
!
'
!!
'
Iro
¬ 1941
RIDGE RD RIDGE RD ! J13F36A 3SS
) ! %
50861929 1947
ile
!
Pipe
12" Cast Iron ! S J13F36 §2G
!!´ !
(
'
M
J13F37 SOUTH
(
! X
uct
!
!
¬J13E39 6B
(¬
!
!
J13E38 1U 1879
( !
D
348-350 18811883
J13E39 8AR SOUTH
16"
) 735
Page 688 of 1174
Page 689
Page 689 of 1174
Page 690
ARM Hydrant Flow Test Inquiry -- Hydrant: J13E24 Test Date/Time: 7/25/2019 14:15 CHI095-B
Address: 115 SLADE AVE Side: E Location: 2ND N/O RIDGE RD
W SENECA
Size of Main/Branch: 24"/6" Fire District: 68024 FIRE DIST 5 Water District: 044 ECWA AREA-WEST SENECA
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Performed By: BPS/CHM Comments: HYDRANT FLOW TEST REQUESTED BY THOMAS YAGER, ISO
PHONE: 716-207-4967; EMAIL: [email protected]
CW #40336
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Dischrge Coef: .90 Elvtn Usgs(ft): Static(psi): 90 Residual(psi): 84 Required Residual Pressure(psi): 20
Gallons Used..: 7,140 Total Flow(gpm): 2,372 Flow at Reqd Resid Pressure: 8,939
Flow Hydrants:
C Flow Hyd Flow Hydrant Address Main/Brnch Nzle Size Pitot Flow Comments
J13 E16 OP 160 SLADE AVE 24"/6" 1: 2.50 50.0 1,186
3RD HYD N/O RIDGE RD 2: 2.50 50.0 1,186
3: Tot Flow: 2,372
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Bottom
I=Flow Hydrant Inquiry
ENTER=Continue F3=Exit F6=Maintain Test F7=Test Hydrant Inquiry F15=Print Test Information
Page 690 of 1174
Page 691
Page 691 of 1174
Page 692
Appendix B
Storm Sewer System Drainage Calculations
Page 692 of 1174
Page 693
Page 693 of 1174
Page 694
Existing Runoff
Page 694 of 1174
Page 695
Page 695 of 1174
Page 696
ST
OP
OP
ST
OP
ST
ST
PO
DA PRE-DEV EAST
27.17 AC
OP
ST
STS
OTPO
P
GV
DA PRE-DEV CENTRAL
GV
22.66 AC
TIME OF
CONCENTRATION
FLOW PATH
GV
DA PRE-DEV WEST
5.75 AC EX. OFFICE
7,980 SF
GV
PRE-DEV DRAINAGE MAP NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
SCALE: 1"=200' 250 0 250 500Ft.
250'
Page 696 of 1174
Page 697
Page 697 of 1174
Page 698
1S 2S 3S
Existing - West Existing - Central Existing - East
4L
TOTAL EXISTING
Subcat Reach Pond Link Routing Diagram for 24-4113 WEST SENECA EXCHANGE EXISTING
Prepared by Carmina Wood Design, Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC
Page 698 of 1174
Page 699
24-4113 WEST SENECA EXCHANGE EXISTING
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 2
Rainfall Events Listing (selected events)
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-Year Type II 24-hr Default 24.00 1 1.87 2
2 10-Year Type II 24-hr Default 24.00 1 3.14 2
3 25-Year Type II 24-hr Default 24.00 1 3.84 2
4 100-Year Type II 24-hr Default 24.00 1 5.23 2
Page 699 of 1174
Page 700
24-4113 WEST SENECA EXCHANGE EXISTING
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 3
Area Listing (selected nodes)
Area CN Description
(acres) (subcatchment-numbers)
7.850 80 >75% Grass cover, Good, HSG D (1S, 2S, 3S)
46.500 98 Paved parking, HSG D (2S, 3S)
1.250 98 Water Surface, HSG D (1S)
55.600 95 TOTAL AREA
Page 700 of 1174
Page 701
24-4113 WEST SENECA EXCHANGE EXISTING
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 4
Soil Listing (selected nodes)
Area Soil Subcatchment
(acres) Group Numbers
0.000 HSG A
0.000 HSG B
0.000 HSG C
55.600 HSG D 1S, 2S, 3S
0.000 Other
55.600 TOTAL AREA
Page 701 of 1174
Page 702
24-4113 WEST SENECA EXCHANGE EXISTING
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 5
Ground Covers (selected nodes)
HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment
(acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers
0.000 0.000 0.000 7.850 0.000 7.850 >75% Grass cover, Good 1S, 2S,
3S
0.000 0.000 0.000 46.500 0.000 46.500 Paved parking 2S, 3S
0.000 0.000 0.000 1.250 0.000 1.250 Water Surface 1S
0.000 0.000 0.000 55.600 0.000 55.600 TOTAL AREA
Page 702 of 1174
Page 703
24-4113 WEST SENECA EXCHANGE EXISTING
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 6
Pipe Listing (selected nodes)
Line# Node In-Invert Out-Invert Length Slope n Width Diam/Height Inside-Fill Node
Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) Name
1 2S 0.00 0.00 745.0 0.0037 0.025 0.0 36.0 0.0
2 2S 0.00 0.00 267.0 0.0015 0.025 0.0 42.0 0.0
3 2S 0.00 0.00 300.0 0.0070 0.025 0.0 54.0 0.0
4 3S 0.00 0.00 745.0 0.0037 0.025 0.0 36.0 0.0
5 3S 0.00 0.00 267.0 0.0015 0.025 0.0 42.0 0.0
6 3S 0.00 0.00 300.0 0.0070 0.025 0.0 54.0 0.0
Page 703 of 1174
Page 704
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 7
Time span=0.00-60.00 hrs, dt=0.01 hrs, 6001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment 1S: Existing - West Runoff Area=5.700 ac 21.93% Impervious Runoff Depth=0.65"
Flow Length=160' Slope=0.0280 '/' Tc=20.6 min CN=84 Runoff=3.92 cfs 0.310 af
Subcatchment 2S: Existing - Central Runoff Area=22.800 ac 87.72% Impervious Runoff Depth=1.45"
Flow Length=2,297' Tc=12.7 min CN=96 Runoff=44.18 cfs 2.753 af
Subcatchment 3S: Existing - East Runoff Area=27.100 ac 97.79% Impervious Runoff Depth=1.65"
Flow Length=2,297' Tc=12.7 min CN=98 Runoff=56.79 cfs 3.716 af
Link 4L: TOTAL EXISTING Inflow=103.89 cfs 6.779 af
Primary=103.89 cfs 6.779 af
Total Runoff Area = 55.600 ac Runoff Volume = 6.779 af Average Runoff Depth = 1.46"
14.12% Pervious = 7.850 ac 85.88% Impervious = 47.750 ac
Page 704 of 1174
Page 705
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment 1S: Existing - West
Runoff = 3.92 cfs @ 12.15 hrs, Volume= 0.310 af, Depth= 0.65"
Routed to Link 4L : TOTAL EXISTING
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (ac) CN Description
1.250 98 Water Surface, HSG D
4.450 80 >75% Grass cover, Good, HSG D
5.700 84 Weighted Average
4.450 78.07% Pervious Area
1.250 21.93% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
20.6 160 0.0280 0.13 Sheet Flow, grass
Grass: Dense n= 0.240 P2= 2.50"
Subcatchment 1S: Existing - West
Hydrograph
Runoff
3.92 cfs
4
Type II 24-hr
1-Year Rainfall=1.87"
3 Runoff Area=5.700 ac
Runoff Volume=0.310 af
Flow (cfs)
Runoff Depth=0.65"
2 Flow Length=160'
Slope=0.0280 '/'
Tc=20.6 min
1
CN=84
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 705 of 1174
Page 706
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 9
Summary for Subcatchment 2S: Existing - Central
[47] Hint: Peak is 209% of capacity of segment #4
[47] Hint: Peak is 218% of capacity of segment #5
Runoff = 44.18 cfs @ 12.04 hrs, Volume= 2.753 af, Depth= 1.45"
Routed to Link 4L : TOTAL EXISTING
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (ac) CN Description
20.000 98 Paved parking, HSG D
2.800 80 >75% Grass cover, Good, HSG D
22.800 96 Weighted Average
2.800 12.28% Pervious Area
20.000 87.72% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.6 300 0.0160 1.39 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
1.1 175 0.0160 2.57 Shallow Concentrated Flow, pavement
Paved Kv= 20.3 fps
0.8 510 0.0110 11.00 132.00 Channel Flow, ditch/swale
Area= 12.0 sf Perim= 10.0' r= 1.20'
n= 0.016 Asphalt, rough
4.2 745 0.0037 2.98 21.10 Pipe Channel, 36" Pipe
36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75'
n= 0.025 Corrugated metal
2.1 267 0.0015 2.11 20.26 Pipe Channel, 42" Pipe
42.0" Round Area= 9.6 sf Perim= 11.0' r= 0.88'
n= 0.025 Corrugated metal
0.9 300 0.0070 5.38 85.55 Pipe Channel, 54" Pipe
54.0" Round Area= 15.9 sf Perim= 14.1' r= 1.13'
n= 0.025 Corrugated metal
12.7 2,297 Total
Page 706 of 1174
Page 707
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 10
Subcatchment 2S: Existing - Central
Hydrograph
48 Runoff
46
44.18 cfs
44
42
Type II 24-hr
40
38 1-Year Rainfall=1.87"
36
34 Runoff Area=22.800 ac
32
30 Runoff Volume=2.753 af
Flow (cfs)
28
26 Runoff Depth=1.45"
24
22 Flow Length=2,297'
20
18 Tc=12.7 min
16
14
12
CN=96
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 707 of 1174
Page 708
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment 3S: Existing - East
[47] Hint: Peak is 269% of capacity of segment #4
[47] Hint: Peak is 280% of capacity of segment #5
Runoff = 56.79 cfs @ 12.04 hrs, Volume= 3.716 af, Depth= 1.65"
Routed to Link 4L : TOTAL EXISTING
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Type II 24-hr 1-Year Rainfall=1.87"
Area (ac) CN Description
26.500 98 Paved parking, HSG D
0.600 80 >75% Grass cover, Good, HSG D
27.100 98 Weighted Average
0.600 2.21% Pervious Area
26.500 97.79% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.6 300 0.0160 1.39 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
1.1 175 0.0160 2.57 Shallow Concentrated Flow, pavement
Paved Kv= 20.3 fps
0.8 510 0.0110 11.00 132.00 Channel Flow, ditch/swale
Area= 12.0 sf Perim= 10.0' r= 1.20'
n= 0.016 Asphalt, rough
4.2 745 0.0037 2.98 21.10 Pipe Channel, 36" Pipe
36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75'
n= 0.025 Corrugated metal
2.1 267 0.0015 2.11 20.26 Pipe Channel, 42" Pipe
42.0" Round Area= 9.6 sf Perim= 11.0' r= 0.88'
n= 0.025 Corrugated metal
0.9 300 0.0070 5.38 85.55 Pipe Channel, 54" Pipe
54.0" Round Area= 15.9 sf Perim= 14.1' r= 1.13'
n= 0.025 Corrugated metal
12.7 2,297 Total
Page 708 of 1174
Page 709
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 12
Subcatchment 3S: Existing - East
Hydrograph
Runoff
60 56.79 cfs
55 Type II 24-hr
50 1-Year Rainfall=1.87"
45 Runoff Area=27.100 ac
40 Runoff Volume=3.716 af
Flow (cfs)
35
Runoff Depth=1.65"
30
Flow Length=2,297'
25
Tc=12.7 min
20
CN=98
15
10
5
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 709 of 1174
Page 710
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 13
Summary for Link 4L: TOTAL EXISTING
Inflow Area = 55.600 ac, 85.88% Impervious, Inflow Depth = 1.46" for 1-Year event
Inflow = 103.89 cfs @ 12.04 hrs, Volume= 6.779 af
Primary = 103.89 cfs @ 12.04 hrs, Volume= 6.779 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Link 4L: TOTAL EXISTING
Hydrograph
Inflow
115 103.89 cfs Primary
110 103.89 cfs
105 Inflow Area=55.600 ac
100
95
90
85
80
75
70
Flow (cfs)
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 710 of 1174
Page 711
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 14
Time span=0.00-60.00 hrs, dt=0.01 hrs, 6001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment 1S: Existing - West Runoff Area=5.700 ac 21.93% Impervious Runoff Depth=1.63"
Flow Length=160' Slope=0.0280 '/' Tc=20.6 min CN=84 Runoff=10.17 cfs 0.775 af
Subcatchment 2S: Existing - Central Runoff Area=22.800 ac 87.72% Impervious Runoff Depth=2.69"
Flow Length=2,297' Tc=12.7 min CN=96 Runoff=79.12 cfs 5.111 af
Subcatchment 3S: Existing - East Runoff Area=27.100 ac 97.79% Impervious Runoff Depth=2.91"
Flow Length=2,297' Tc=12.7 min CN=98 Runoff=97.41 cfs 6.567 af
Link 4L: TOTAL EXISTING Inflow=184.66 cfs 12.453 af
Primary=184.66 cfs 12.453 af
Total Runoff Area = 55.600 ac Runoff Volume = 12.453 af Average Runoff Depth = 2.69"
14.12% Pervious = 7.850 ac 85.88% Impervious = 47.750 ac
Page 711 of 1174
Page 712
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 15
Summary for Subcatchment 1S: Existing - West
Runoff = 10.17 cfs @ 12.13 hrs, Volume= 0.775 af, Depth= 1.63"
Routed to Link 4L : TOTAL EXISTING
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (ac) CN Description
1.250 98 Water Surface, HSG D
4.450 80 >75% Grass cover, Good, HSG D
5.700 84 Weighted Average
4.450 78.07% Pervious Area
1.250 21.93% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
20.6 160 0.0280 0.13 Sheet Flow, grass
Grass: Dense n= 0.240 P2= 2.50"
Subcatchment 1S: Existing - West
Hydrograph
Runoff
11 10.17 cfs
10 Type II 24-hr
9 10-Year Rainfall=3.14"
8 Runoff Area=5.700 ac
7 Runoff Volume=0.775 af
Flow (cfs)
6 Runoff Depth=1.63"
5 Flow Length=160'
4 Slope=0.0280 '/'
3 Tc=20.6 min
2 CN=84
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 712 of 1174
Page 713
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 16
Summary for Subcatchment 2S: Existing - Central
[47] Hint: Peak is 375% of capacity of segment #4
[47] Hint: Peak is 390% of capacity of segment #5
Runoff = 79.12 cfs @ 12.04 hrs, Volume= 5.111 af, Depth= 2.69"
Routed to Link 4L : TOTAL EXISTING
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (ac) CN Description
20.000 98 Paved parking, HSG D
2.800 80 >75% Grass cover, Good, HSG D
22.800 96 Weighted Average
2.800 12.28% Pervious Area
20.000 87.72% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.6 300 0.0160 1.39 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
1.1 175 0.0160 2.57 Shallow Concentrated Flow, pavement
Paved Kv= 20.3 fps
0.8 510 0.0110 11.00 132.00 Channel Flow, ditch/swale
Area= 12.0 sf Perim= 10.0' r= 1.20'
n= 0.016 Asphalt, rough
4.2 745 0.0037 2.98 21.10 Pipe Channel, 36" Pipe
36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75'
n= 0.025 Corrugated metal
2.1 267 0.0015 2.11 20.26 Pipe Channel, 42" Pipe
42.0" Round Area= 9.6 sf Perim= 11.0' r= 0.88'
n= 0.025 Corrugated metal
0.9 300 0.0070 5.38 85.55 Pipe Channel, 54" Pipe
54.0" Round Area= 15.9 sf Perim= 14.1' r= 1.13'
n= 0.025 Corrugated metal
12.7 2,297 Total
Page 713 of 1174
Page 714
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 17
Subcatchment 2S: Existing - Central
Hydrograph
Runoff
85 79.12 cfs
80
75
Type II 24-hr
70 10-Year Rainfall=3.14"
65
60
Runoff Area=22.800 ac
55 Runoff Volume=5.111 af
Flow (cfs)
50
45
Runoff Depth=2.69"
40 Flow Length=2,297'
35
30
Tc=12.7 min
25 CN=96
20
15
10
5
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 714 of 1174
Page 715
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 18
Summary for Subcatchment 3S: Existing - East
[47] Hint: Peak is 462% of capacity of segment #4
[47] Hint: Peak is 481% of capacity of segment #5
[47] Hint: Peak is 114% of capacity of segment #6
Runoff = 97.41 cfs @ 12.04 hrs, Volume= 6.567 af, Depth= 2.91"
Routed to Link 4L : TOTAL EXISTING
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Type II 24-hr 10-Year Rainfall=3.14"
Area (ac) CN Description
26.500 98 Paved parking, HSG D
0.600 80 >75% Grass cover, Good, HSG D
27.100 98 Weighted Average
0.600 2.21% Pervious Area
26.500 97.79% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.6 300 0.0160 1.39 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
1.1 175 0.0160 2.57 Shallow Concentrated Flow, pavement
Paved Kv= 20.3 fps
0.8 510 0.0110 11.00 132.00 Channel Flow, ditch/swale
Area= 12.0 sf Perim= 10.0' r= 1.20'
n= 0.016 Asphalt, rough
4.2 745 0.0037 2.98 21.10 Pipe Channel, 36" Pipe
36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75'
n= 0.025 Corrugated metal
2.1 267 0.0015 2.11 20.26 Pipe Channel, 42" Pipe
42.0" Round Area= 9.6 sf Perim= 11.0' r= 0.88'
n= 0.025 Corrugated metal
0.9 300 0.0070 5.38 85.55 Pipe Channel, 54" Pipe
54.0" Round Area= 15.9 sf Perim= 14.1' r= 1.13'
n= 0.025 Corrugated metal
12.7 2,297 Total
Page 715 of 1174
Page 716
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 19
Subcatchment 3S: Existing - East
Hydrograph
Runoff
105 97.41 cfs
100
95 Type II 24-hr
90
85 10-Year Rainfall=3.14"
80
75 Runoff Area=27.100 ac
70
65
Runoff Volume=6.567 af
Flow (cfs)
60
55
Runoff Depth=2.91"
50
45
Flow Length=2,297'
40 Tc=12.7 min
35
30 CN=98
25
20
15
10
5
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 716 of 1174
Page 717
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 10-Year Rainfall=3.14"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 20
Summary for Link 4L: TOTAL EXISTING
Inflow Area = 55.600 ac, 85.88% Impervious, Inflow Depth = 2.69" for 10-Year event
Inflow = 184.66 cfs @ 12.04 hrs, Volume= 12.453 af
Primary = 184.66 cfs @ 12.04 hrs, Volume= 12.453 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Link 4L: TOTAL EXISTING
Hydrograph
Inflow
184.66 cfs Primary
200 184.66 cfs
190
180
Inflow Area=55.600 ac
170
160
150
140
130
120
Flow (cfs)
110
100
90
80
70
60
50
40
30
20
10
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 717 of 1174
Page 718
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 21
Time span=0.00-60.00 hrs, dt=0.01 hrs, 6001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment 1S: Existing - West Runoff Area=5.700 ac 21.93% Impervious Runoff Depth=2.23"
Flow Length=160' Slope=0.0280 '/' Tc=20.6 min CN=84 Runoff=13.91 cfs 1.060 af
Subcatchment 2S: Existing - Central Runoff Area=22.800 ac 87.72% Impervious Runoff Depth=3.38"
Flow Length=2,297' Tc=12.7 min CN=96 Runoff=98.15 cfs 6.425 af
Subcatchment 3S: Existing - East Runoff Area=27.100 ac 97.79% Impervious Runoff Depth=3.61"
Flow Length=2,297' Tc=12.7 min CN=98 Runoff=119.64 cfs 8.142 af
Link 4L: TOTAL EXISTING Inflow=229.09 cfs 15.627 af
Primary=229.09 cfs 15.627 af
Total Runoff Area = 55.600 ac Runoff Volume = 15.627 af Average Runoff Depth = 3.37"
14.12% Pervious = 7.850 ac 85.88% Impervious = 47.750 ac
Page 718 of 1174
Page 719
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 22
Summary for Subcatchment 1S: Existing - West
Runoff = 13.91 cfs @ 12.13 hrs, Volume= 1.060 af, Depth= 2.23"
Routed to Link 4L : TOTAL EXISTING
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (ac) CN Description
1.250 98 Water Surface, HSG D
4.450 80 >75% Grass cover, Good, HSG D
5.700 84 Weighted Average
4.450 78.07% Pervious Area
1.250 21.93% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
20.6 160 0.0280 0.13 Sheet Flow, grass
Grass: Dense n= 0.240 P2= 2.50"
Subcatchment 1S: Existing - West
Hydrograph
Runoff
15 13.91 cfs
14
Type II 24-hr
13
12 25-Year Rainfall=3.84"
11 Runoff Area=5.700 ac
10
Runoff Volume=1.060 af
9
Flow (cfs)
8 Runoff Depth=2.23"
7 Flow Length=160'
6
Slope=0.0280 '/'
5
4 Tc=20.6 min
3 CN=84
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 719 of 1174
Page 720
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 23
Summary for Subcatchment 2S: Existing - Central
[47] Hint: Peak is 465% of capacity of segment #4
[47] Hint: Peak is 484% of capacity of segment #5
[47] Hint: Peak is 115% of capacity of segment #6
Runoff = 98.15 cfs @ 12.04 hrs, Volume= 6.425 af, Depth= 3.38"
Routed to Link 4L : TOTAL EXISTING
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (ac) CN Description
20.000 98 Paved parking, HSG D
2.800 80 >75% Grass cover, Good, HSG D
22.800 96 Weighted Average
2.800 12.28% Pervious Area
20.000 87.72% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.6 300 0.0160 1.39 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
1.1 175 0.0160 2.57 Shallow Concentrated Flow, pavement
Paved Kv= 20.3 fps
0.8 510 0.0110 11.00 132.00 Channel Flow, ditch/swale
Area= 12.0 sf Perim= 10.0' r= 1.20'
n= 0.016 Asphalt, rough
4.2 745 0.0037 2.98 21.10 Pipe Channel, 36" Pipe
36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75'
n= 0.025 Corrugated metal
2.1 267 0.0015 2.11 20.26 Pipe Channel, 42" Pipe
42.0" Round Area= 9.6 sf Perim= 11.0' r= 0.88'
n= 0.025 Corrugated metal
0.9 300 0.0070 5.38 85.55 Pipe Channel, 54" Pipe
54.0" Round Area= 15.9 sf Perim= 14.1' r= 1.13'
n= 0.025 Corrugated metal
12.7 2,297 Total
Page 720 of 1174
Page 721
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 24
Subcatchment 2S: Existing - Central
Hydrograph
Runoff
105 98.15 cfs
100
95 Type II 24-hr
90
85 25-Year Rainfall=3.84"
80
75 Runoff Area=22.800 ac
70
65
Runoff Volume=6.425 af
Flow (cfs)
60
55
Runoff Depth=3.38"
50
45
Flow Length=2,297'
40 Tc=12.7 min
35
30 CN=96
25
20
15
10
5
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 721 of 1174
Page 722
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 25
Summary for Subcatchment 3S: Existing - East
[47] Hint: Peak is 567% of capacity of segment #4
[47] Hint: Peak is 590% of capacity of segment #5
[47] Hint: Peak is 140% of capacity of segment #6
Runoff = 119.64 cfs @ 12.04 hrs, Volume= 8.142 af, Depth= 3.61"
Routed to Link 4L : TOTAL EXISTING
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Type II 24-hr 25-Year Rainfall=3.84"
Area (ac) CN Description
26.500 98 Paved parking, HSG D
0.600 80 >75% Grass cover, Good, HSG D
27.100 98 Weighted Average
0.600 2.21% Pervious Area
26.500 97.79% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.6 300 0.0160 1.39 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
1.1 175 0.0160 2.57 Shallow Concentrated Flow, pavement
Paved Kv= 20.3 fps
0.8 510 0.0110 11.00 132.00 Channel Flow, ditch/swale
Area= 12.0 sf Perim= 10.0' r= 1.20'
n= 0.016 Asphalt, rough
4.2 745 0.0037 2.98 21.10 Pipe Channel, 36" Pipe
36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75'
n= 0.025 Corrugated metal
2.1 267 0.0015 2.11 20.26 Pipe Channel, 42" Pipe
42.0" Round Area= 9.6 sf Perim= 11.0' r= 0.88'
n= 0.025 Corrugated metal
0.9 300 0.0070 5.38 85.55 Pipe Channel, 54" Pipe
54.0" Round Area= 15.9 sf Perim= 14.1' r= 1.13'
n= 0.025 Corrugated metal
12.7 2,297 Total
Page 722 of 1174
Page 723
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 26
Subcatchment 3S: Existing - East
Hydrograph
130 Runoff
119.64 cfs
120
Type II 24-hr
110
25-Year Rainfall=3.84"
100
90
Runoff Area=27.100 ac
80 Runoff Volume=8.142 af
Flow (cfs)
70 Runoff Depth=3.61"
60 Flow Length=2,297'
50 Tc=12.7 min
40
CN=98
30
20
10
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 723 of 1174
Page 724
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 25-Year Rainfall=3.84"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 27
Summary for Link 4L: TOTAL EXISTING
Inflow Area = 55.600 ac, 85.88% Impervious, Inflow Depth = 3.37" for 25-Year event
Inflow = 229.09 cfs @ 12.04 hrs, Volume= 15.627 af
Primary = 229.09 cfs @ 12.04 hrs, Volume= 15.627 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Link 4L: TOTAL EXISTING
Hydrograph
Inflow
229.09 cfs Primary
229.09 cfs
240
Inflow Area=55.600 ac
220
200
180
160
Flow (cfs)
140
120
100
80
60
40
20
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 724 of 1174
Page 725
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 28
Time span=0.00-60.00 hrs, dt=0.01 hrs, 6001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment 1S: Existing - West Runoff Area=5.700 ac 21.93% Impervious Runoff Depth=3.48"
Flow Length=160' Slope=0.0280 '/' Tc=20.6 min CN=84 Runoff=21.56 cfs 1.654 af
Subcatchment 2S: Existing - Central Runoff Area=22.800 ac 87.72% Impervious Runoff Depth=4.76"
Flow Length=2,297' Tc=12.7 min CN=96 Runoff=135.65 cfs 9.046 af
Subcatchment 3S: Existing - East Runoff Area=27.100 ac 97.79% Impervious Runoff Depth=4.99"
Flow Length=2,297' Tc=12.7 min CN=98 Runoff=163.64 cfs 11.275 af
Link 4L: TOTAL EXISTING Inflow=317.14 cfs 21.975 af
Primary=317.14 cfs 21.975 af
Total Runoff Area = 55.600 ac Runoff Volume = 21.975 af Average Runoff Depth = 4.74"
14.12% Pervious = 7.850 ac 85.88% Impervious = 47.750 ac
Page 725 of 1174
Page 726
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 29
Summary for Subcatchment 1S: Existing - West
Runoff = 21.56 cfs @ 12.13 hrs, Volume= 1.654 af, Depth= 3.48"
Routed to Link 4L : TOTAL EXISTING
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (ac) CN Description
1.250 98 Water Surface, HSG D
4.450 80 >75% Grass cover, Good, HSG D
5.700 84 Weighted Average
4.450 78.07% Pervious Area
1.250 21.93% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
20.6 160 0.0280 0.13 Sheet Flow, grass
Grass: Dense n= 0.240 P2= 2.50"
Subcatchment 1S: Existing - West
Hydrograph
24 Runoff
23 21.56 cfs
22
21 Type II 24-hr
20
19 100-Year Rainfall=5.23"
18
17 Runoff Area=5.700 ac
16
15
14
Runoff Volume=1.654 af
Flow (cfs)
13
12
Runoff Depth=3.48"
11
10
Flow Length=160'
9
8
Slope=0.0280 '/'
7
6
Tc=20.6 min
5
4
CN=84
3
2
1
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 726 of 1174
Page 727
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 30
Summary for Subcatchment 2S: Existing - Central
[47] Hint: Peak is 103% of capacity of segment #3
[47] Hint: Peak is 643% of capacity of segment #4
[47] Hint: Peak is 669% of capacity of segment #5
[47] Hint: Peak is 159% of capacity of segment #6
Runoff = 135.65 cfs @ 12.04 hrs, Volume= 9.046 af, Depth= 4.76"
Routed to Link 4L : TOTAL EXISTING
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (ac) CN Description
20.000 98 Paved parking, HSG D
2.800 80 >75% Grass cover, Good, HSG D
22.800 96 Weighted Average
2.800 12.28% Pervious Area
20.000 87.72% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.6 300 0.0160 1.39 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
1.1 175 0.0160 2.57 Shallow Concentrated Flow, pavement
Paved Kv= 20.3 fps
0.8 510 0.0110 11.00 132.00 Channel Flow, ditch/swale
Area= 12.0 sf Perim= 10.0' r= 1.20'
n= 0.016 Asphalt, rough
4.2 745 0.0037 2.98 21.10 Pipe Channel, 36" Pipe
36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75'
n= 0.025 Corrugated metal
2.1 267 0.0015 2.11 20.26 Pipe Channel, 42" Pipe
42.0" Round Area= 9.6 sf Perim= 11.0' r= 0.88'
n= 0.025 Corrugated metal
0.9 300 0.0070 5.38 85.55 Pipe Channel, 54" Pipe
54.0" Round Area= 15.9 sf Perim= 14.1' r= 1.13'
n= 0.025 Corrugated metal
12.7 2,297 Total
Page 727 of 1174
Page 728
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 31
Subcatchment 2S: Existing - Central
Hydrograph
150 Runoff
135.65 cfs
140
130 Type II 24-hr
120 100-Year Rainfall=5.23"
110
Runoff Area=22.800 ac
100
90
Runoff Volume=9.046 af
Flow (cfs)
80 Runoff Depth=4.76"
70
Flow Length=2,297'
60
50
Tc=12.7 min
40 CN=96
30
20
10
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 728 of 1174
Page 729
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 32
Summary for Subcatchment 3S: Existing - East
[47] Hint: Peak is 124% of capacity of segment #3
[47] Hint: Peak is 776% of capacity of segment #4
[47] Hint: Peak is 808% of capacity of segment #5
[47] Hint: Peak is 191% of capacity of segment #6
Runoff = 163.64 cfs @ 12.04 hrs, Volume= 11.275 af, Depth= 4.99"
Routed to Link 4L : TOTAL EXISTING
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Type II 24-hr 100-Year Rainfall=5.23"
Area (ac) CN Description
26.500 98 Paved parking, HSG D
0.600 80 >75% Grass cover, Good, HSG D
27.100 98 Weighted Average
0.600 2.21% Pervious Area
26.500 97.79% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
3.6 300 0.0160 1.39 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
1.1 175 0.0160 2.57 Shallow Concentrated Flow, pavement
Paved Kv= 20.3 fps
0.8 510 0.0110 11.00 132.00 Channel Flow, ditch/swale
Area= 12.0 sf Perim= 10.0' r= 1.20'
n= 0.016 Asphalt, rough
4.2 745 0.0037 2.98 21.10 Pipe Channel, 36" Pipe
36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75'
n= 0.025 Corrugated metal
2.1 267 0.0015 2.11 20.26 Pipe Channel, 42" Pipe
42.0" Round Area= 9.6 sf Perim= 11.0' r= 0.88'
n= 0.025 Corrugated metal
0.9 300 0.0070 5.38 85.55 Pipe Channel, 54" Pipe
54.0" Round Area= 15.9 sf Perim= 14.1' r= 1.13'
n= 0.025 Corrugated metal
12.7 2,297 Total
Page 729 of 1174
Page 730
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 33
Subcatchment 3S: Existing - East
Hydrograph
180 Runoff
163.64 cfs
170
160 Type II 24-hr
150
140
100-Year Rainfall=5.23"
130 Runoff Area=27.100 ac
120
110
Runoff Volume=11.275 af
Flow (cfs)
100 Runoff Depth=4.99"
90
80
Flow Length=2,297'
70 Tc=12.7 min
60
50
CN=98
40
30
20
10
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 730 of 1174
Page 731
24-4113 WEST SENECA EXCHANGE EXISTING Type II 24-hr 100-Year Rainfall=5.23"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 34
Summary for Link 4L: TOTAL EXISTING
Inflow Area = 55.600 ac, 85.88% Impervious, Inflow Depth = 4.74" for 100-Year event
Inflow = 317.14 cfs @ 12.04 hrs, Volume= 21.975 af
Primary = 317.14 cfs @ 12.04 hrs, Volume= 21.975 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs
Link 4L: TOTAL EXISTING
Hydrograph
Inflow
317.14 cfs Primary
340 317.14 cfs
320 Inflow Area=55.600 ac
300
280
260
240
220
Flow (cfs)
200
180
160
140
120
100
80
60
40
20
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60
Time (hours)
Page 731 of 1174
Page 732
Proposed Runoff
Page 732 of 1174
Page 733
Page 733 of 1174
Page 734
ST
OP
DA UNCONTROLLED
OP
ST
15
11.34 AC
20
DA PROPOSED EAST
24
25
25
25
25
6.76 AC 28
29
29
29
29
29
OP
ST
29
29
29
29
18
28
29
28
29
13
28 29
13 28
29
13
29
WHO PROPO
16
13 29
13
LE SED
-BW
158 SALE R
W
76
-B
STOP
-BW
76
STO
W
P
76
,000 ETA
-B
76
13 SF IL
8
O
PATI
STOP
STOP
8
DA COSTCO
10
STOP
8
O
PATI
TION
CAU
STOP
13
STOP
STOP
STOP
CAU
TION
STOP
7
9
21.49 AC
CAU
GV
TION
TION
CAU
5 STOP
16
11
27
9 TIME OF TION
CAU
STOP
5
12 STOP
CONCENTRATION
STOP
CAU
TION
STOP
5
CAU
13
STOP
TION
STOP
STOP 29
FLOW PATH
TION
CAU
20
STOP
9 19
6
8
18
STOP
7
CAU
TION
17
1
TION
6
STOP 2
CAU
10 16
3
GV
11
25
STOP
5
5
STOP STOP 15 12
4
STOP
15
13
23 23 14
21
CAU
22
TION
CAU
TION
TION
19
CAU
19
TION
STOP
CAU
17
DA PROPOSED WEST
18
STOP
16
STOP 17
STOP
13
CAU
12 15
ST
TION
14
STOP
STOP
ST
TION
CAU
12
ST
19.31 AC
ST
STOP STOP STOP STOP STOP STOP STOP STOP STOP
STOP
ST
STOP
STOP
5
STOP
STOP
ST
STOP
STOP
ST 4
STOP
14
18
ST ST ST
STOP
STOP
10
12
10 STOP
DA SLADE AVE
9
0.90 AC EX. OFFICE
7,980 SF
13
10 10
STOP 10 10
STOP
ST ST ST
STOP
GV
POST-DEV DRAINAGE MAP NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
SCALE: 1"=250' 250 0 250 500Ft.
250'
Page 734 of 1174
Page 735
Page 735 of 1174
Page 736
12L
15S
14S
COSTCO
PDA-3
1S Proposed - East
6S
Proposed - West
DA Uncontrolled
13S
18P
Slade Ave CB 13L
16P
POND
TOTAL
12S OUTLET PIPE
Slade Ave
Subcat Reach Pond Link Routing Diagram for 24-4113 WEST SENECA EXCAHNGE PROPOSED
Prepared by Carmina Wood Design, Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC
Page 736 of 1174
Page 737
24-4113 WEST SENECA EXCAHNGE PROPOSED
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 2
Project Notes
Copied 10 events from NY-WestSeneca_NOAA14 24-hr S1 storm
Copied 10 events from NY-WestSeneca_NOAA14 24-hr S1 storm
Page 737 of 1174
Page 738
24-4113 WEST SENECA EXCAHNGE PROPOSED
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 3
Rainfall Events Listing
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 1-yr NY-WestSeneca_NOAA14 24-hr S1 1-yr Default 24.00 1 1.87 2
2 10-yr NY-WestSeneca_NOAA14 24-hr S1 10-yr Default 24.00 1 3.39 2
3 25-yr NY-WestSeneca_NOAA14 24-hr S1 25-yr Default 24.00 1 4.10 2
4 100-yr NY-WestSeneca_NOAA14 24-hr S1 100-yr Default 24.00 1 5.20 2
Page 738 of 1174
Page 739
24-4113 WEST SENECA EXCAHNGE PROPOSED
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 4
Area Listing (selected nodes)
Area CN Description
(acres) (subcatchment-numbers)
6.876 80 >75% Grass cover, Good, HSG D (1S, 6S, 14S, 15S)
23.175 98 Paved parking, HSG D (1S, 6S, 12S, 13S, 14S, 15S)
8.420 98 Roofs, HSG D (1S, 6S, 14S)
38.471 95 TOTAL AREA
Page 739 of 1174
Page 740
24-4113 WEST SENECA EXCAHNGE PROPOSED
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 5
Soil Listing (selected nodes)
Area Soil Subcatchment
(acres) Group Numbers
0.000 HSG A
0.000 HSG B
0.000 HSG C
38.471 HSG D 1S, 6S, 12S, 13S, 14S, 15S
0.000 Other
38.471 TOTAL AREA
Page 740 of 1174
Page 741
24-4113 WEST SENECA EXCAHNGE PROPOSED
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 6
Ground Covers (selected nodes)
HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment
(acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers
0.000 0.000 0.000 6.876 0.000 6.876 >75% Grass cover, Good 1S, 6S,
14S,
15S
0.000 0.000 0.000 23.175 0.000 23.175 Paved parking 1S, 6S,
12S,
13S,
14S,
15S
0.000 0.000 0.000 8.420 0.000 8.420 Roofs 1S, 6S,
14S
0.000 0.000 0.000 38.471 0.000 38.471 TOTAL AREA
Page 741 of 1174
Page 742
24-4113 WEST SENECA EXCAHNGE PROPOSED
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 7
Pipe Listing (selected nodes)
Line# Node In-Invert Out-Invert Length Slope n Width Diam/Height Inside-Fill Node
Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) Name
1 1S 0.00 0.00 950.0 0.0080 0.013 0.0 18.0 0.0
2 6S 0.00 0.00 580.0 0.0040 0.025 0.0 36.0 0.0
3 12S 0.00 0.00 60.0 0.0025 0.013 0.0 12.0 0.0
4 13S 0.00 0.00 60.0 0.0025 0.013 0.0 12.0 0.0
5 14S 0.00 0.00 700.0 0.0050 0.013 0.0 24.0 0.0
6 16P 603.56 601.35 641.0 0.0034 0.013 58.0 94.0 0.0
7 18P 607.95 604.56 685.0 0.0049 0.013 0.0 48.0 0.0
Page 742 of 1174
Page 743
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 8
Time span=0.00-150.00 hrs, dt=0.01 hrs, 15001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment 1S: Proposed - West Runoff Area=19.210 ac 73.66% Impervious Runoff Depth=1.20"
Flow Length=1,050' Tc=4.8 min CN=93 Runoff=40.40 cfs 1.915 af
Subcatchment 6S: DA Uncontrolled Runoff Area=11.340 ac 86.77% Impervious Runoff Depth=1.45"
Flow Length=850' Tc=6.0 min CN=96 Runoff=26.40 cfs 1.369 af
Subcatchment 12S: Slade Ave Runoff Area=0.450 ac 100.00% Impervious Runoff Depth=1.65"
Flow Length=90' Tc=0.9 min CN=98 Runoff=1.33 cfs 0.062 af
Subcatchment 13S: Slade Ave Runoff Area=0.450 ac 100.00% Impervious Runoff Depth=1.65"
Flow Length=90' Tc=0.9 min CN=98 Runoff=1.33 cfs 0.062 af
Subcatchment 14S: Proposed - East Runoff Area=6.760 ac 97.78% Impervious Runoff Depth=1.65"
Flow Length=890' Tc=4.8 min CN=98 Runoff=18.18 cfs 0.927 af
Subcatchment 15S: PDA-3 Runoff Area=11,375 sf 36.48% Impervious Runoff Depth=0.81"
Tc=5.0 min CN=87 Runoff=0.36 cfs 0.018 af
Pond 16P: OUTLET PIPE Peak Elev=605.42' Inflow=38.71 cfs 6.652 af
58.0" x 94.0" Box Culvert n=0.013 L=641.0' S=0.0034 '/' Outflow=38.71 cfs 6.652 af
Pond 18P: POND Peak Elev=609.62' Storage=99,248 cf Inflow=106.67 cfs 5.283 af
Primary=20.20 cfs 5.283 af Secondary=0.00 cfs 0.000 af Outflow=20.20 cfs 5.283 af
1-yr
LinkPrimary Outflow Imported from COSTCO HYDROCAD 2026-04-13~Link 16L.hce Inflow=46.67 cfs 2.301 af
Area= 924,495 sf 78.41% Imperv. Primary=46.67 cfs 2.301 af
Link 13L: TOTAL Inflow=38.71 cfs 6.652 af
Primary=38.71 cfs 6.652 af
Total Runoff Area = 38.471 ac Runoff Volume = 4.352 af Average Runoff Depth = 1.36"
17.87% Pervious = 6.876 ac 82.13% Impervious = 31.595 ac
Page 743 of 1174
Page 744
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 9
Summary for Subcatchment 1S: Proposed - West
[47] Hint: Peak is 430% of capacity of segment #2
Runoff = 40.40 cfs @ 12.03 hrs, Volume= 1.915 af, Depth= 1.20"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Area (ac) CN Description
5.060 80 >75% Grass cover, Good, HSG D
4.110 98 Roofs, HSG D
10.040 98 Paved parking, HSG D
19.210 93 Weighted Average
5.060 26.34% Pervious Area
14.150 73.66% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.8 100 0.0100 0.92 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
3.0 950 0.0080 5.32 9.40 Pipe Channel, 18" PIPE
18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38'
n= 0.013 Corrugated PE, smooth interior
4.8 1,050 Total
Subcatchment 1S: Proposed - West
Hydrograph
44 Runoff
40.40 cfs
42
40 NY-WestSeneca_NOAA14 24-hr S1 1-yr
38 Rainfall=1.87"
36 Runoff Area=19.210 ac
34
Runoff Volume=1.915 af
32
30
Runoff Depth=1.20"
28 Flow Length=1,050'
26 Tc=4.8 min
Flow (cfs)
24 CN=93
22
20
18
16
14
12
10
8
6
4
2
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 744 of 1174
Page 745
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment 6S: DA Uncontrolled
[47] Hint: Peak is 120% of capacity of segment #3
Runoff = 26.40 cfs @ 12.04 hrs, Volume= 1.369 af, Depth= 1.45"
Routed to Pond 16P : OUTLET PIPE
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Area (ac) CN Description
7.720 98 Paved parking, HSG D
1.500 80 >75% Grass cover, Good, HSG D
2.120 98 Roofs, HSG D
11.340 96 Weighted Average
1.500 13.23% Pervious Area
9.840 86.77% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.8 100 0.0100 0.92 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
1.1 170 0.0150 2.49 Shallow Concentrated Flow, PVMT
Paved Kv= 20.3 fps
3.1 580 0.0040 3.10 21.94 Pipe Channel, 36" Pipe
36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75'
n= 0.025 Corrugated metal
6.0 850 Total
Page 745 of 1174
Page 746
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 11
Subcatchment 6S: DA Uncontrolled
Hydrograph
Runoff
28 26.40 cfs
26 NY-WestSeneca_NOAA14 24-hr S1 1-yr
Rainfall=1.87"
24
Runoff Area=11.340 ac
22 Runoff Volume=1.369 af
20 Runoff Depth=1.45"
18
Flow Length=850'
Tc=6.0 min
Flow (cfs)
16
CN=96
14
12
10
8
6
4
2
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 746 of 1174
Page 747
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 12
Summary for Subcatchment 12S: Slade Ave
[49] Hint: Tc<2dt may require smaller dt
Runoff = 1.33 cfs @ 11.99 hrs, Volume= 0.062 af, Depth= 1.65"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Area (ac) CN Description
0.450 98 Paved parking, HSG D
0.450 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.5 30 0.0200 0.96 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
0.4 60 0.0025 2.27 1.78 Pipe Channel, 12" pipe
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.9 90 Total
Subcatchment 12S: Slade Ave
Hydrograph
Runoff
1.33 cfs
NY-WestSeneca_NOAA14 24-hr S1 1-yr
Rainfall=1.87"
Runoff Area=0.450 ac
Runoff Volume=0.062 af
1 Runoff Depth=1.65"
Flow Length=90'
Tc=0.9 min
Flow (cfs)
CN=98
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 747 of 1174
Page 748
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 13
Summary for Subcatchment 13S: Slade Ave
[49] Hint: Tc<2dt may require smaller dt
Runoff = 1.33 cfs @ 11.99 hrs, Volume= 0.062 af, Depth= 1.65"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Area (ac) CN Description
0.450 98 Paved parking, HSG D
0.450 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.5 30 0.0200 0.96 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
0.4 60 0.0025 2.27 1.78 Pipe Channel, 12" pipe
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.9 90 Total
Subcatchment 13S: Slade Ave
Hydrograph
Runoff
1.33 cfs
NY-WestSeneca_NOAA14 24-hr S1 1-yr
Rainfall=1.87"
Runoff Area=0.450 ac
Runoff Volume=0.062 af
1 Runoff Depth=1.65"
Flow Length=90'
Tc=0.9 min
Flow (cfs)
CN=98
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 748 of 1174
Page 749
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 14
Summary for Subcatchment 14S: Proposed - East
[47] Hint: Peak is 114% of capacity of segment #3
Runoff = 18.18 cfs @ 12.02 hrs, Volume= 0.927 af, Depth= 1.65"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Area (ac) CN Description
4.420 98 Paved parking, HSG D
2.190 98 Roofs, HSG D
0.150 80 >75% Grass cover, Good, HSG D
6.760 98 Weighted Average
0.150 2.22% Pervious Area
6.610 97.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.8 100 0.0100 0.92 Sheet Flow, PVMT
Smooth surfaces n= 0.011 P2= 2.50"
0.7 90 0.0100 2.03 Shallow Concentrated Flow,
Paved Kv= 20.3 fps
2.3 700 0.0050 5.09 16.00 Pipe Channel, PIPE
24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50'
n= 0.013 Concrete pipe, bends & connections
4.8 890 Total
Page 749 of 1174
Page 750
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 15
Subcatchment 14S: Proposed - East
Hydrograph
20 Runoff
19
18.18 cfs
18 NY-WestSeneca_NOAA14 24-hr S1 1-yr
17 Rainfall=1.87"
16 Runoff Area=6.760 ac
15 Runoff Volume=0.927 af
14 Runoff Depth=1.65"
13 Flow Length=890'
12 Tc=4.8 min
Flow (cfs)
11
CN=98
10
9
8
7
6
5
4
3
2
1
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 750 of 1174
Page 751
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 16
Summary for Subcatchment 15S: PDA-3
Runoff = 0.36 cfs @ 12.03 hrs, Volume= 0.018 af, Depth= 0.81"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Area (sf) CN Description
7,225 80 >75% Grass cover, Good, HSG D
4,150 98 Paved parking, HSG D
11,375 87 Weighted Average
7,225 63.52% Pervious Area
4,150 36.48% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry,
Subcatchment 15S: PDA-3
Hydrograph
0.4 Runoff
0.38 0.36 cfs
0.36 NY-WestSeneca_NOAA14 24-hr S1 1-yr
0.34 Rainfall=1.87"
0.32 Runoff Area=11,375 sf
0.3 Runoff Volume=0.018 af
0.28 Runoff Depth=0.81"
0.26
Tc=5.0 min
0.24
CN=87
Flow (cfs)
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 751 of 1174
Page 752
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 17
Summary for Pond 16P: OUTLET PIPE
Inflow Area = 59.695 ac, 80.80% Impervious, Inflow Depth = 1.34" for 1-yr event
Inflow = 38.71 cfs @ 12.05 hrs, Volume= 6.652 af
Outflow = 38.71 cfs @ 12.05 hrs, Volume= 6.652 af, Atten= 0%, Lag= 0.0 min
Primary = 38.71 cfs @ 12.05 hrs, Volume= 6.652 af
Routed to Link 13L : TOTAL
Routing by Dyn-Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
Peak Elev= 605.42' @ 12.05 hrs
Flood Elev= 612.00'
Device Routing Invert Outlet Devices
#1 Primary 603.56' 58.0" W x 94.0" H Box Culvert
L= 641.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 603.56' / 601.35' S= 0.0034 '/' Cc= 0.900
n= 0.013 Concrete pipe, bends & connections, Flow Area= 37.86 sf
Primary OutFlow Max=38.68 cfs @ 12.05 hrs HW=605.42' TW=0.00' (Dynamic Tailwater)
1=Culvert (Barrel Controls 38.68 cfs @ 5.74 fps)
Pond 16P: OUTLET PIPE
Hydrograph
Inflow
38.71 cfs Primary
42 38.71 cfs
40
38
Inflow Area=59.695 ac
36
34
Peak Elev=605.42'
32
30
58.0" x 94.0"
28
26 Box Culvert
Flow (cfs)
24
22 n=0.013
20
18 L=641.0'
16
14 S=0.0034 '/'
12
10
8
6
4
2
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 752 of 1174
Page 753
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 18
Summary for Pond 18P: POND
[44] Hint: Outlet device #1 is below defined storage
Inflow Area = 48.355 ac, 79.40% Impervious, Inflow Depth = 1.31" for 1-yr event
Inflow = 106.67 cfs @ 12.03 hrs, Volume= 5.283 af
Outflow = 20.20 cfs @ 12.36 hrs, Volume= 5.283 af, Atten= 81%, Lag= 20.0 min
Primary = 20.20 cfs @ 12.36 hrs, Volume= 5.283 af
Routed to Pond 16P : OUTLET PIPE
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Dyn-Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
Peak Elev= 609.62' @ 12.36 hrs Surf.Area= 64,897 sf Storage= 99,248 cf
Plug-Flow detention time= 185.3 min calculated for 5.283 af (100% of inflow)
Center-of-Mass det. time= 185.5 min ( 983.8 - 798.3 )
Volume Invert Avail.Storage Storage Description
#1 608.00' 471,250 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
608.00 57,300 0 0
614.50 87,700 471,250 471,250
Device Routing Invert Outlet Devices
#1 Primary 607.95' 48.0" Round Culvert
L= 685.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 607.95' / 604.56' S= 0.0049 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 12.57 sf
#2 Secondary 614.00' 50.0' long + 3.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=20.20 cfs @ 12.36 hrs HW=609.62' TW=604.95' (Dynamic Tailwater)
1=Culvert (Barrel Controls 20.20 cfs @ 5.98 fps)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=608.00' (Free Discharge)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 753 of 1174
Page 754
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 19
Pond 18P: POND
Hydrograph
106.67 cfs Inflow
Outflow
Primary
Inflow Area=48.355 ac Secondary
110 Peak Elev=609.62'
100 Storage=99,248 cf
90
80
70
Flow (cfs)
60
50
40 20.20 cfs
20.20 cfs
30
20
10
0.00 cfs
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 754 of 1174
Page 755
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 20
Summary for Link 12L: COSTCO
Inflow Area = 21.223 ac, 78.41% Impervious, Inflow Depth = 1.30" for 1-yr event
Inflow = 46.67 cfs @ 12.03 hrs, Volume= 2.301 af
Primary = 46.67 cfs @ 12.03 hrs, Volume= 2.301 af, Atten= 0%, Lag= 0.0 min
Routed to Pond 18P : POND
Primary outflow = Inflow, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
1-yr Primary Outflow Imported from COSTCO HYDROCAD 2026-04-13~Link 16L.hce
Link 12L: COSTCO
Hydrograph
Inflow
46.67 cfs Primary
50 46.67 cfs Inflow Area=21.223 ac
1-yr Primary Outflow
45 Imported from
COSTCO HYDROCAD 2026-04-13~Link 16L.hce
40 Area= 924,495 sf
78.41% Imperv.
35
30
Flow (cfs)
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 755 of 1174
Page 756
24-4113 WEST SENECA EXCAHNGE NY-WestSeneca_NOAA14 24-hr S1 1-yr Rainfall=1.87"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 21
Summary for Link 13L: TOTAL
Inflow Area = 59.695 ac, 80.80% Impervious, Inflow Depth = 1.34" for 1-yr event
Inflow = 38.71 cfs @ 12.05 hrs, Volume= 6.652 af
Primary = 38.71 cfs @ 12.05 hrs, Volume= 6.652 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
Link 13L: TOTAL
Hydrograph
Inflow
38.71 cfs Primary
42 38.71 cfs
40
38
Inflow Area=59.695 ac
36
34
32
30
28
26
Flow (cfs)
24
22
20
18
16
14
12
10
8
6
4
2
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 756 of 1174
Page 757
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 22
Time span=0.00-150.00 hrs, dt=0.01 hrs, 15001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment 1S: Proposed - West Runoff Area=19.210 ac 73.66% Impervious Runoff Depth=2.63"
Flow Length=1,050' Tc=4.8 min CN=93 Runoff=86.22 cfs 4.208 af
Subcatchment 6S: DA Uncontrolled Runoff Area=11.340 ac 86.77% Impervious Runoff Depth=2.94"
Flow Length=850' Tc=6.0 min CN=96 Runoff=51.57 cfs 2.775 af
Subcatchment 12S: Slade Ave Runoff Area=0.450 ac 100.00% Impervious Runoff Depth=3.16"
Flow Length=90' Tc=0.9 min CN=98 Runoff=2.45 cfs 0.118 af
Subcatchment 13S: Slade Ave Runoff Area=0.450 ac 100.00% Impervious Runoff Depth=3.16"
Flow Length=90' Tc=0.9 min CN=98 Runoff=2.45 cfs 0.118 af
Subcatchment 14S: Proposed - East Runoff Area=6.760 ac 97.78% Impervious Runoff Depth=3.16"
Flow Length=890' Tc=4.8 min CN=98 Runoff=33.74 cfs 1.778 af
Subcatchment 15S: PDA-3 Runoff Area=11,375 sf 36.48% Impervious Runoff Depth=2.08"
Tc=5.0 min CN=87 Runoff=0.95 cfs 0.045 af
Pond 16P: OUTLET PIPE Peak Elev=606.96' Inflow=87.97 cfs 13.894 af
58.0" x 94.0" Box Culvert n=0.013 L=641.0' S=0.0034 '/' Outflow=87.97 cfs 13.894 af
Pond 18P: POND Peak Elev=610.89' Storage=185,425 cf Inflow=218.75 cfs 11.119 af
Primary=53.90 cfs 11.119 af Secondary=0.00 cfs 0.000 af Outflow=53.90 cfs 11.119 af
10-yr
LinkPrimary Outflow Imported from COSTCO HYDROCAD 2026-04-13~Link 16L.hce Inflow=96.07 cfs 4.850 af
Area= 924,495 sf 78.41% Imperv. Primary=96.07 cfs 4.850 af
Link 13L: TOTAL Inflow=87.97 cfs 13.894 af
Primary=87.97 cfs 13.894 af
Total Runoff Area = 38.471 ac Runoff Volume = 9.044 af Average Runoff Depth = 2.82"
17.87% Pervious = 6.876 ac 82.13% Impervious = 31.595 ac
Page 757 of 1174
Page 758
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 23
Summary for Subcatchment 1S: Proposed - West
[47] Hint: Peak is 918% of capacity of segment #2
Runoff = 86.22 cfs @ 12.02 hrs, Volume= 4.208 af, Depth= 2.63"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Area (ac) CN Description
5.060 80 >75% Grass cover, Good, HSG D
4.110 98 Roofs, HSG D
10.040 98 Paved parking, HSG D
19.210 93 Weighted Average
5.060 26.34% Pervious Area
14.150 73.66% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.8 100 0.0100 0.92 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
3.0 950 0.0080 5.32 9.40 Pipe Channel, 18" PIPE
18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38'
n= 0.013 Corrugated PE, smooth interior
4.8 1,050 Total
Subcatchment 1S: Proposed - West
Hydrograph
95 Runoff
90
86.22 cfs
85 NY-WestSeneca_NOAA14 24-hr S1 10-yr
80 Rainfall=3.39"
75 Runoff Area=19.210 ac
70 Runoff Volume=4.208 af
65 Runoff Depth=2.63"
60 Flow Length=1,050'
Tc=4.8 min
Flow (cfs)
55
50 CN=93
45
40
35
30
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 758 of 1174
Page 759
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 24
Summary for Subcatchment 6S: DA Uncontrolled
[47] Hint: Peak is 235% of capacity of segment #3
Runoff = 51.57 cfs @ 12.04 hrs, Volume= 2.775 af, Depth= 2.94"
Routed to Pond 16P : OUTLET PIPE
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Area (ac) CN Description
7.720 98 Paved parking, HSG D
1.500 80 >75% Grass cover, Good, HSG D
2.120 98 Roofs, HSG D
11.340 96 Weighted Average
1.500 13.23% Pervious Area
9.840 86.77% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.8 100 0.0100 0.92 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
1.1 170 0.0150 2.49 Shallow Concentrated Flow, PVMT
Paved Kv= 20.3 fps
3.1 580 0.0040 3.10 21.94 Pipe Channel, 36" Pipe
36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75'
n= 0.025 Corrugated metal
6.0 850 Total
Page 759 of 1174
Page 760
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 25
Subcatchment 6S: DA Uncontrolled
Hydrograph
Runoff
55 51.57 cfs
NY-WestSeneca_NOAA14 24-hr S1 10-yr
50
Rainfall=3.39"
45 Runoff Area=11.340 ac
Runoff Volume=2.775 af
40 Runoff Depth=2.94"
35
Flow Length=850'
Tc=6.0 min
Flow (cfs)
30 CN=96
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 760 of 1174
Page 761
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 26
Summary for Subcatchment 12S: Slade Ave
[49] Hint: Tc<2dt may require smaller dt
[47] Hint: Peak is 138% of capacity of segment #2
Runoff = 2.45 cfs @ 11.99 hrs, Volume= 0.118 af, Depth= 3.16"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Area (ac) CN Description
0.450 98 Paved parking, HSG D
0.450 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.5 30 0.0200 0.96 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
0.4 60 0.0025 2.27 1.78 Pipe Channel, 12" pipe
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.9 90 Total
Subcatchment 12S: Slade Ave
Hydrograph
Runoff
2.45 cfs
NY-WestSeneca_NOAA14 24-hr S1 10-yr
Rainfall=3.39"
Runoff Area=0.450 ac
2 Runoff Volume=0.118 af
Runoff Depth=3.16"
Flow Length=90'
Tc=0.9 min
Flow (cfs)
CN=98
1
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 761 of 1174
Page 762
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 27
Summary for Subcatchment 13S: Slade Ave
[49] Hint: Tc<2dt may require smaller dt
[47] Hint: Peak is 138% of capacity of segment #2
Runoff = 2.45 cfs @ 11.99 hrs, Volume= 0.118 af, Depth= 3.16"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Area (ac) CN Description
0.450 98 Paved parking, HSG D
0.450 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.5 30 0.0200 0.96 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
0.4 60 0.0025 2.27 1.78 Pipe Channel, 12" pipe
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.9 90 Total
Subcatchment 13S: Slade Ave
Hydrograph
Runoff
2.45 cfs
NY-WestSeneca_NOAA14 24-hr S1 10-yr
Rainfall=3.39"
Runoff Area=0.450 ac
2 Runoff Volume=0.118 af
Runoff Depth=3.16"
Flow Length=90'
Tc=0.9 min
Flow (cfs)
CN=98
1
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 762 of 1174
Page 763
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 28
Summary for Subcatchment 14S: Proposed - East
[47] Hint: Peak is 211% of capacity of segment #3
Runoff = 33.74 cfs @ 12.02 hrs, Volume= 1.778 af, Depth= 3.16"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Area (ac) CN Description
4.420 98 Paved parking, HSG D
2.190 98 Roofs, HSG D
0.150 80 >75% Grass cover, Good, HSG D
6.760 98 Weighted Average
0.150 2.22% Pervious Area
6.610 97.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.8 100 0.0100 0.92 Sheet Flow, PVMT
Smooth surfaces n= 0.011 P2= 2.50"
0.7 90 0.0100 2.03 Shallow Concentrated Flow,
Paved Kv= 20.3 fps
2.3 700 0.0050 5.09 16.00 Pipe Channel, PIPE
24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50'
n= 0.013 Concrete pipe, bends & connections
4.8 890 Total
Page 763 of 1174
Page 764
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 29
Subcatchment 14S: Proposed - East
Hydrograph
Runoff
36 33.74 cfs
34 NY-WestSeneca_NOAA14 24-hr S1 10-yr
32 Rainfall=3.39"
30 Runoff Area=6.760 ac
28 Runoff Volume=1.778 af
26 Runoff Depth=3.16"
24 Flow Length=890'
22 Tc=4.8 min
Flow (cfs)
20 CN=98
18
16
14
12
10
8
6
4
2
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 764 of 1174
Page 765
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 30
Summary for Subcatchment 15S: PDA-3
Runoff = 0.95 cfs @ 12.03 hrs, Volume= 0.045 af, Depth= 2.08"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Area (sf) CN Description
7,225 80 >75% Grass cover, Good, HSG D
4,150 98 Paved parking, HSG D
11,375 87 Weighted Average
7,225 63.52% Pervious Area
4,150 36.48% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry,
Subcatchment 15S: PDA-3
Hydrograph
Runoff
1 0.95 cfs
NY-WestSeneca_NOAA14 24-hr S1 10-yr
Rainfall=3.39"
Runoff Area=11,375 sf
Runoff Volume=0.045 af
Runoff Depth=2.08"
Tc=5.0 min
CN=87
Flow (cfs)
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 765 of 1174
Page 766
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 31
Summary for Pond 16P: OUTLET PIPE
Inflow Area = 59.695 ac, 80.80% Impervious, Inflow Depth = 2.79" for 10-yr event
Inflow = 87.97 cfs @ 12.05 hrs, Volume= 13.894 af
Outflow = 87.97 cfs @ 12.05 hrs, Volume= 13.894 af, Atten= 0%, Lag= 0.0 min
Primary = 87.97 cfs @ 12.05 hrs, Volume= 13.894 af
Routed to Link 13L : TOTAL
Routing by Dyn-Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
Peak Elev= 606.96' @ 12.05 hrs
Flood Elev= 612.00'
Device Routing Invert Outlet Devices
#1 Primary 603.56' 58.0" W x 94.0" H Box Culvert
L= 641.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 603.56' / 601.35' S= 0.0034 '/' Cc= 0.900
n= 0.013 Concrete pipe, bends & connections, Flow Area= 37.86 sf
Primary OutFlow Max=87.86 cfs @ 12.05 hrs HW=606.96' TW=0.00' (Dynamic Tailwater)
1=Culvert (Barrel Controls 87.86 cfs @ 7.13 fps)
Pond 16P: OUTLET PIPE
Hydrograph
Inflow
87.97 cfs Primary
95 87.97 cfs
90 Inflow Area=59.695 ac
85
80 Peak Elev=606.96'
75
70 58.0" x 94.0"
65
60 Box Culvert
Flow (cfs)
55
50 n=0.013
45
40 L=641.0'
35
30 S=0.0034 '/'
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 766 of 1174
Page 767
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 32
Summary for Pond 18P: POND
[44] Hint: Outlet device #1 is below defined storage
Inflow Area = 48.355 ac, 79.40% Impervious, Inflow Depth = 2.76" for 10-yr event
Inflow = 218.75 cfs @ 12.02 hrs, Volume= 11.119 af
Outflow = 53.90 cfs @ 12.25 hrs, Volume= 11.119 af, Atten= 75%, Lag= 13.3 min
Primary = 53.90 cfs @ 12.25 hrs, Volume= 11.119 af
Routed to Pond 16P : OUTLET PIPE
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Dyn-Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
Peak Elev= 610.89' @ 12.25 hrs Surf.Area= 70,836 sf Storage= 185,425 cf
Plug-Flow detention time= 131.1 min calculated for 11.118 af (100% of inflow)
Center-of-Mass det. time= 131.3 min ( 910.8 - 779.5 )
Volume Invert Avail.Storage Storage Description
#1 608.00' 471,250 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
608.00 57,300 0 0
614.50 87,700 471,250 471,250
Device Routing Invert Outlet Devices
#1 Primary 607.95' 48.0" Round Culvert
L= 685.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 607.95' / 604.56' S= 0.0049 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 12.57 sf
#2 Secondary 614.00' 50.0' long + 3.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=53.90 cfs @ 12.25 hrs HW=610.89' TW=606.37' (Dynamic Tailwater)
1=Culvert (Barrel Controls 53.90 cfs @ 7.58 fps)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=608.00' (Free Discharge)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 767 of 1174
Page 768
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 33
Pond 18P: POND
Hydrograph
218.75 cfs Inflow
Outflow
Primary
240
Inflow Area=48.355 ac Secondary
220 Peak Elev=610.89'
200 Storage=185,425 cf
180
160
Flow (cfs)
140
120
100
53.90 cfs
80 53.90 cfs
60
40
20
0.00 cfs
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 768 of 1174
Page 769
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 34
Summary for Link 12L: COSTCO
Inflow Area = 21.223 ac, 78.41% Impervious, Inflow Depth = 2.74" for 10-yr event
Inflow = 96.07 cfs @ 12.03 hrs, Volume= 4.850 af
Primary = 96.07 cfs @ 12.03 hrs, Volume= 4.850 af, Atten= 0%, Lag= 0.0 min
Routed to Pond 18P : POND
Primary outflow = Inflow, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
10-yr Primary Outflow Imported from COSTCO HYDROCAD 2026-04-13~Link 16L.hce
Link 12L: COSTCO
Hydrograph
Inflow
96.07 cfs Primary
105 96.07 cfs
100 Inflow Area=21.223 ac
10-yr Primary Outflow
95
Imported from
90
COSTCO HYDROCAD 2026-04-13~Link 16L.hce
85 Area= 924,495 sf
80 78.41% Imperv.
75
70
65
Flow (cfs)
60
55
50
45
40
35
30
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 769 of 1174
Page 770
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 10-yr Rainfall=3.39"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 35
Summary for Link 13L: TOTAL
Inflow Area = 59.695 ac, 80.80% Impervious, Inflow Depth = 2.79" for 10-yr event
Inflow = 87.97 cfs @ 12.05 hrs, Volume= 13.894 af
Primary = 87.97 cfs @ 12.05 hrs, Volume= 13.894 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
Link 13L: TOTAL
Hydrograph
Inflow
87.97 cfs Primary
95 87.97 cfs
90 Inflow Area=59.695 ac
85
80
75
70
65
60
Flow (cfs)
55
50
45
40
35
30
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 770 of 1174
Page 771
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 36
Time span=0.00-150.00 hrs, dt=0.01 hrs, 15001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment 1S: Proposed - West Runoff Area=19.210 ac 73.66% Impervious Runoff Depth=3.32"
Flow Length=1,050' Tc=4.8 min CN=93 Runoff=107.55 cfs 5.310 af
Subcatchment 6S: DA Uncontrolled Runoff Area=11.340 ac 86.77% Impervious Runoff Depth=3.64"
Flow Length=850' Tc=6.0 min CN=96 Runoff=63.19 cfs 3.439 af
Subcatchment 12S: Slade Ave Runoff Area=0.450 ac 100.00% Impervious Runoff Depth=3.86"
Flow Length=90' Tc=0.9 min CN=98 Runoff=2.98 cfs 0.145 af
Subcatchment 13S: Slade Ave Runoff Area=0.450 ac 100.00% Impervious Runoff Depth=3.86"
Flow Length=90' Tc=0.9 min CN=98 Runoff=2.98 cfs 0.145 af
Subcatchment 14S: Proposed - East Runoff Area=6.760 ac 97.78% Impervious Runoff Depth=3.86"
Flow Length=890' Tc=4.8 min CN=98 Runoff=40.97 cfs 2.177 af
Subcatchment 15S: PDA-3 Runoff Area=11,375 sf 36.48% Impervious Runoff Depth=2.73"
Tc=5.0 min CN=87 Runoff=1.24 cfs 0.059 af
Pond 16P: OUTLET PIPE Peak Elev=607.58' Inflow=109.83 cfs 17.346 af
58.0" x 94.0" Box Culvert n=0.013 L=641.0' S=0.0034 '/' Outflow=109.83 cfs 17.346 af
Pond 18P: POND Peak Elev=611.43' Storage=223,774 cf Inflow=271.07 cfs 13.907 af
Primary=69.28 cfs 13.907 af Secondary=0.00 cfs 0.000 af Outflow=69.28 cfs 13.907 af
25-yr
LinkPrimary Outflow Imported from COSTCO HYDROCAD 2026-04-13~Link 16L.hce Inflow=119.16 cfs 6.071 af
Area= 924,495 sf 78.41% Imperv. Primary=119.16 cfs 6.071 af
Link 13L: TOTAL Inflow=109.83 cfs 17.346 af
Primary=109.83 cfs 17.346 af
Total Runoff Area = 38.471 ac Runoff Volume = 11.276 af Average Runoff Depth = 3.52"
17.87% Pervious = 6.876 ac 82.13% Impervious = 31.595 ac
Page 771 of 1174
Page 772
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 37
Summary for Subcatchment 1S: Proposed - West
[47] Hint: Peak is 1145% of capacity of segment #2
Runoff = 107.55 cfs @ 12.02 hrs, Volume= 5.310 af, Depth= 3.32"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Area (ac) CN Description
5.060 80 >75% Grass cover, Good, HSG D
4.110 98 Roofs, HSG D
10.040 98 Paved parking, HSG D
19.210 93 Weighted Average
5.060 26.34% Pervious Area
14.150 73.66% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.8 100 0.0100 0.92 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
3.0 950 0.0080 5.32 9.40 Pipe Channel, 18" PIPE
18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38'
n= 0.013 Corrugated PE, smooth interior
4.8 1,050 Total
Subcatchment 1S: Proposed - West
Hydrograph
120
Runoff
115 107.55 cfs
110
105
NY-WestSeneca_NOAA14 24-hr S1 25-yr
100 Rainfall=4.10"
95 Runoff Area=19.210 ac
90 Runoff Volume=5.310 af
85
80
Runoff Depth=3.32"
75 Flow Length=1,050'
70 Tc=4.8 min
Flow (cfs)
65
CN=93
60
55
50
45
40
35
30
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 772 of 1174
Page 773
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 38
Summary for Subcatchment 6S: DA Uncontrolled
[47] Hint: Peak is 288% of capacity of segment #3
Runoff = 63.19 cfs @ 12.04 hrs, Volume= 3.439 af, Depth= 3.64"
Routed to Pond 16P : OUTLET PIPE
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Area (ac) CN Description
7.720 98 Paved parking, HSG D
1.500 80 >75% Grass cover, Good, HSG D
2.120 98 Roofs, HSG D
11.340 96 Weighted Average
1.500 13.23% Pervious Area
9.840 86.77% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.8 100 0.0100 0.92 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
1.1 170 0.0150 2.49 Shallow Concentrated Flow, PVMT
Paved Kv= 20.3 fps
3.1 580 0.0040 3.10 21.94 Pipe Channel, 36" Pipe
36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75'
n= 0.025 Corrugated metal
6.0 850 Total
Page 773 of 1174
Page 774
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 39
Subcatchment 6S: DA Uncontrolled
Hydrograph
70 Runoff
63.19 cfs
65
NY-WestSeneca_NOAA14 24-hr S1 25-yr
60 Rainfall=4.10"
55 Runoff Area=11.340 ac
Runoff Volume=3.439 af
50
Runoff Depth=3.64"
45 Flow Length=850'
Tc=6.0 min
Flow (cfs)
40
CN=96
35
30
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 774 of 1174
Page 775
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 40
Summary for Subcatchment 12S: Slade Ave
[49] Hint: Tc<2dt may require smaller dt
[47] Hint: Peak is 167% of capacity of segment #2
Runoff = 2.98 cfs @ 11.99 hrs, Volume= 0.145 af, Depth= 3.86"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Area (ac) CN Description
0.450 98 Paved parking, HSG D
0.450 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.5 30 0.0200 0.96 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
0.4 60 0.0025 2.27 1.78 Pipe Channel, 12" pipe
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.9 90 Total
Subcatchment 12S: Slade Ave
Hydrograph
Runoff
2.98 cfs
3 NY-WestSeneca_NOAA14 24-hr S1 25-yr
Rainfall=4.10"
Runoff Area=0.450 ac
Runoff Volume=0.145 af
Runoff Depth=3.86"
Flow Length=90'
2
Tc=0.9 min
Flow (cfs)
CN=98
1
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 775 of 1174
Page 776
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 41
Summary for Subcatchment 13S: Slade Ave
[49] Hint: Tc<2dt may require smaller dt
[47] Hint: Peak is 167% of capacity of segment #2
Runoff = 2.98 cfs @ 11.99 hrs, Volume= 0.145 af, Depth= 3.86"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Area (ac) CN Description
0.450 98 Paved parking, HSG D
0.450 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.5 30 0.0200 0.96 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
0.4 60 0.0025 2.27 1.78 Pipe Channel, 12" pipe
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.9 90 Total
Subcatchment 13S: Slade Ave
Hydrograph
Runoff
2.98 cfs
3 NY-WestSeneca_NOAA14 24-hr S1 25-yr
Rainfall=4.10"
Runoff Area=0.450 ac
Runoff Volume=0.145 af
Runoff Depth=3.86"
Flow Length=90'
2
Tc=0.9 min
Flow (cfs)
CN=98
1
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 776 of 1174
Page 777
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 42
Summary for Subcatchment 14S: Proposed - East
[47] Hint: Peak is 256% of capacity of segment #3
Runoff = 40.97 cfs @ 12.02 hrs, Volume= 2.177 af, Depth= 3.86"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Area (ac) CN Description
4.420 98 Paved parking, HSG D
2.190 98 Roofs, HSG D
0.150 80 >75% Grass cover, Good, HSG D
6.760 98 Weighted Average
0.150 2.22% Pervious Area
6.610 97.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.8 100 0.0100 0.92 Sheet Flow, PVMT
Smooth surfaces n= 0.011 P2= 2.50"
0.7 90 0.0100 2.03 Shallow Concentrated Flow,
Paved Kv= 20.3 fps
2.3 700 0.0050 5.09 16.00 Pipe Channel, PIPE
24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50'
n= 0.013 Concrete pipe, bends & connections
4.8 890 Total
Page 777 of 1174
Page 778
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 43
Subcatchment 14S: Proposed - East
Hydrograph
Runoff
44 40.97 cfs
42
40
NY-WestSeneca_NOAA14 24-hr S1 25-yr
38 Rainfall=4.10"
36 Runoff Area=6.760 ac
34 Runoff Volume=2.177 af
32
Runoff Depth=3.86"
30
28
Flow Length=890'
Tc=4.8 min
Flow (cfs)
26
24 CN=98
22
20
18
16
14
12
10
8
6
4
2
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 778 of 1174
Page 779
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 44
Summary for Subcatchment 15S: PDA-3
Runoff = 1.24 cfs @ 12.03 hrs, Volume= 0.059 af, Depth= 2.73"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Area (sf) CN Description
7,225 80 >75% Grass cover, Good, HSG D
4,150 98 Paved parking, HSG D
11,375 87 Weighted Average
7,225 63.52% Pervious Area
4,150 36.48% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry,
Subcatchment 15S: PDA-3
Hydrograph
Runoff
1.24 cfs
NY-WestSeneca_NOAA14 24-hr S1 25-yr
Rainfall=4.10"
Runoff Area=11,375 sf
1 Runoff Volume=0.059 af
Runoff Depth=2.73"
Tc=5.0 min
CN=87
Flow (cfs)
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 779 of 1174
Page 780
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 45
Summary for Pond 16P: OUTLET PIPE
Inflow Area = 59.695 ac, 80.80% Impervious, Inflow Depth = 3.49" for 25-yr event
Inflow = 109.83 cfs @ 12.05 hrs, Volume= 17.346 af
Outflow = 109.83 cfs @ 12.05 hrs, Volume= 17.346 af, Atten= 0%, Lag= 0.0 min
Primary = 109.83 cfs @ 12.05 hrs, Volume= 17.346 af
Routed to Link 13L : TOTAL
Routing by Dyn-Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
Peak Elev= 607.58' @ 12.05 hrs
Flood Elev= 612.00'
Device Routing Invert Outlet Devices
#1 Primary 603.56' 58.0" W x 94.0" H Box Culvert
L= 641.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 603.56' / 601.35' S= 0.0034 '/' Cc= 0.900
n= 0.013 Concrete pipe, bends & connections, Flow Area= 37.86 sf
Primary OutFlow Max=109.70 cfs @ 12.05 hrs HW=607.58' TW=0.00' (Dynamic Tailwater)
1=Culvert (Barrel Controls 109.70 cfs @ 7.54 fps)
Pond 16P: OUTLET PIPE
Hydrograph
Inflow
109.83 cfs Primary
120 109.83 cfs
115
110 Inflow Area=59.695 ac
105
100 Peak Elev=607.58'
95
90
85
58.0" x 94.0"
80
75 Box Culvert
Flow (cfs)
70
65 n=0.013
60
55
50
L=641.0'
45
40 S=0.0034 '/'
35
30
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 780 of 1174
Page 781
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 46
Summary for Pond 18P: POND
[44] Hint: Outlet device #1 is below defined storage
Inflow Area = 48.355 ac, 79.40% Impervious, Inflow Depth = 3.45" for 25-yr event
Inflow = 271.07 cfs @ 12.02 hrs, Volume= 13.907 af
Outflow = 69.28 cfs @ 12.23 hrs, Volume= 13.907 af, Atten= 74%, Lag= 12.4 min
Primary = 69.28 cfs @ 12.23 hrs, Volume= 13.907 af
Routed to Pond 16P : OUTLET PIPE
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Dyn-Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
Peak Elev= 611.43' @ 12.23 hrs Surf.Area= 73,324 sf Storage= 223,774 cf
Plug-Flow detention time= 119.2 min calculated for 13.906 af (100% of inflow)
Center-of-Mass det. time= 119.4 min ( 893.6 - 774.2 )
Volume Invert Avail.Storage Storage Description
#1 608.00' 471,250 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
608.00 57,300 0 0
614.50 87,700 471,250 471,250
Device Routing Invert Outlet Devices
#1 Primary 607.95' 48.0" Round Culvert
L= 685.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 607.95' / 604.56' S= 0.0049 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 12.57 sf
#2 Secondary 614.00' 50.0' long + 3.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=69.28 cfs @ 12.23 hrs HW=611.43' TW=606.95' (Dynamic Tailwater)
1=Culvert (Barrel Controls 69.28 cfs @ 7.99 fps)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=608.00' (Free Discharge)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 781 of 1174
Page 782
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 47
Pond 18P: POND
Hydrograph
271.07 cfs Inflow
Outflow
Primary
300
Inflow Area=48.355 ac Secondary
280 Peak Elev=611.43'
260
240
Storage=223,774 cf
220
200
180
Flow (cfs)
160
140
120 69.28 cfs
100 69.28 cfs
80
60
40
0.00 cfs
20
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 782 of 1174
Page 783
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 48
Summary for Link 12L: COSTCO
Inflow Area = 21.223 ac, 78.41% Impervious, Inflow Depth = 3.43" for 25-yr event
Inflow = 119.16 cfs @ 12.03 hrs, Volume= 6.071 af
Primary = 119.16 cfs @ 12.03 hrs, Volume= 6.071 af, Atten= 0%, Lag= 0.0 min
Routed to Pond 18P : POND
Primary outflow = Inflow, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
25-yr Primary Outflow Imported from COSTCO HYDROCAD 2026-04-13~Link 16L.hce
Link 12L: COSTCO
Hydrograph
Inflow
119.16 cfs Primary
130 119.16 cfs Inflow Area=21.223 ac
120 25-yr Primary Outflow
Imported from
110 COSTCO HYDROCAD 2026-04-13~Link 16L.hce
Area= 924,495 sf
100
78.41% Imperv.
90
80
Flow (cfs)
70
60
50
40
30
20
10
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 783 of 1174
Page 784
24-4113 WEST SENECA EXCAHNGENY-WestSeneca_NOAA14 24-hr S1 25-yr Rainfall=4.10"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 49
Summary for Link 13L: TOTAL
Inflow Area = 59.695 ac, 80.80% Impervious, Inflow Depth = 3.49" for 25-yr event
Inflow = 109.83 cfs @ 12.05 hrs, Volume= 17.346 af
Primary = 109.83 cfs @ 12.05 hrs, Volume= 17.346 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
Link 13L: TOTAL
Hydrograph
Inflow
109.83 cfs Primary
120 109.83 cfs
115
110 Inflow Area=59.695 ac
105
100
95
90
85
80
75
Flow (cfs)
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 784 of 1174
Page 785
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 50
Time span=0.00-150.00 hrs, dt=0.01 hrs, 15001 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment 1S: Proposed - West Runoff Area=19.210 ac 73.66% Impervious Runoff Depth=4.39"
Flow Length=1,050' Tc=4.8 min CN=93 Runoff=140.14 cfs 7.035 af
Subcatchment 6S: DA Uncontrolled Runoff Area=11.340 ac 86.77% Impervious Runoff Depth=4.73"
Flow Length=850' Tc=6.0 min CN=96 Runoff=80.95 cfs 4.471 af
Subcatchment 12S: Slade Ave Runoff Area=0.450 ac 100.00% Impervious Runoff Depth=4.96"
Flow Length=90' Tc=0.9 min CN=98 Runoff=3.78 cfs 0.186 af
Subcatchment 13S: Slade Ave Runoff Area=0.450 ac 100.00% Impervious Runoff Depth=4.96"
Flow Length=90' Tc=0.9 min CN=98 Runoff=3.78 cfs 0.186 af
Subcatchment 14S: Proposed - East Runoff Area=6.760 ac 97.78% Impervious Runoff Depth=4.96"
Flow Length=890' Tc=4.8 min CN=98 Runoff=52.06 cfs 2.796 af
Subcatchment 15S: PDA-3 Runoff Area=11,375 sf 36.48% Impervious Runoff Depth=3.76"
Tc=5.0 min CN=87 Runoff=1.68 cfs 0.082 af
Pond 16P: OUTLET PIPE Peak Elev=608.42' Inflow=141.36 cfs 22.734 af
58.0" x 94.0" Box Culvert n=0.013 L=641.0' S=0.0034 '/' Outflow=141.36 cfs 22.734 af
Pond 18P: POND Peak Elev=612.22' Storage=283,293 cf Inflow=351.21 cfs 18.262 af
Primary=90.10 cfs 18.262 af Secondary=0.00 cfs 0.000 af Outflow=90.10 cfs 18.262 af
100-yr
LinkPrimary Outflow Imported from COSTCO HYDROCAD 2026-04-13~Link 16L.hce Inflow=154.57 cfs 7.978 af
Area= 924,495 sf 78.41% Imperv. Primary=154.57 cfs 7.978 af
Link 13L: TOTAL Inflow=141.36 cfs 22.734 af
Primary=141.36 cfs 22.734 af
Total Runoff Area = 38.471 ac Runoff Volume = 14.756 af Average Runoff Depth = 4.60"
17.87% Pervious = 6.876 ac 82.13% Impervious = 31.595 ac
Page 785 of 1174
Page 786
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 51
Summary for Subcatchment 1S: Proposed - West
[47] Hint: Peak is 1492% of capacity of segment #2
Runoff = 140.14 cfs @ 12.02 hrs, Volume= 7.035 af, Depth= 4.39"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Area (ac) CN Description
5.060 80 >75% Grass cover, Good, HSG D
4.110 98 Roofs, HSG D
10.040 98 Paved parking, HSG D
19.210 93 Weighted Average
5.060 26.34% Pervious Area
14.150 73.66% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.8 100 0.0100 0.92 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
3.0 950 0.0080 5.32 9.40 Pipe Channel, 18" PIPE
18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38'
n= 0.013 Corrugated PE, smooth interior
4.8 1,050 Total
Subcatchment 1S: Proposed - West
Hydrograph
Runoff
150 140.14 cfs
140 NY-WestSeneca_NOAA14 24-hr S1 100-yr
Rainfall=5.20"
130
Runoff Area=19.210 ac
120 Runoff Volume=7.035 af
110 Runoff Depth=4.39"
Flow Length=1,050'
100
Tc=4.8 min
90 CN=93
Flow (cfs)
80
70
60
50
40
30
20
10
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 786 of 1174
Page 787
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 52
Summary for Subcatchment 6S: DA Uncontrolled
[47] Hint: Peak is 369% of capacity of segment #3
Runoff = 80.95 cfs @ 12.04 hrs, Volume= 4.471 af, Depth= 4.73"
Routed to Pond 16P : OUTLET PIPE
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Area (ac) CN Description
7.720 98 Paved parking, HSG D
1.500 80 >75% Grass cover, Good, HSG D
2.120 98 Roofs, HSG D
11.340 96 Weighted Average
1.500 13.23% Pervious Area
9.840 86.77% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.8 100 0.0100 0.92 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
1.1 170 0.0150 2.49 Shallow Concentrated Flow, PVMT
Paved Kv= 20.3 fps
3.1 580 0.0040 3.10 21.94 Pipe Channel, 36" Pipe
36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75'
n= 0.025 Corrugated metal
6.0 850 Total
Page 787 of 1174
Page 788
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 53
Subcatchment 6S: DA Uncontrolled
Hydrograph
90 Runoff
85 80.95 cfs
80 NY-WestSeneca_NOAA14 24-hr S1 100-yr
Rainfall=5.20"
75
Runoff Area=11.340 ac
70
Runoff Volume=4.471 af
65 Runoff Depth=4.73"
60 Flow Length=850'
55 Tc=6.0 min
CN=96
Flow (cfs)
50
45
40
35
30
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 788 of 1174
Page 789
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 54
Summary for Subcatchment 12S: Slade Ave
[49] Hint: Tc<2dt may require smaller dt
[47] Hint: Peak is 212% of capacity of segment #2
Runoff = 3.78 cfs @ 11.99 hrs, Volume= 0.186 af, Depth= 4.96"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Area (ac) CN Description
0.450 98 Paved parking, HSG D
0.450 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.5 30 0.0200 0.96 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
0.4 60 0.0025 2.27 1.78 Pipe Channel, 12" pipe
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.9 90 Total
Subcatchment 12S: Slade Ave
Hydrograph
Runoff
4 3.78 cfs
NY-WestSeneca_NOAA14 24-hr S1 100-yr
Rainfall=5.20"
Runoff Area=0.450 ac
Runoff Volume=0.186 af
3 Runoff Depth=4.96"
Flow Length=90'
Tc=0.9 min
CN=98
Flow (cfs)
2
1
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 789 of 1174
Page 790
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 55
Summary for Subcatchment 13S: Slade Ave
[49] Hint: Tc<2dt may require smaller dt
[47] Hint: Peak is 212% of capacity of segment #2
Runoff = 3.78 cfs @ 11.99 hrs, Volume= 0.186 af, Depth= 4.96"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Area (ac) CN Description
0.450 98 Paved parking, HSG D
0.450 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
0.5 30 0.0200 0.96 Sheet Flow, pavement
Smooth surfaces n= 0.011 P2= 2.50"
0.4 60 0.0025 2.27 1.78 Pipe Channel, 12" pipe
12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
n= 0.013 Corrugated PE, smooth interior
0.9 90 Total
Subcatchment 13S: Slade Ave
Hydrograph
Runoff
4 3.78 cfs
NY-WestSeneca_NOAA14 24-hr S1 100-yr
Rainfall=5.20"
Runoff Area=0.450 ac
Runoff Volume=0.186 af
3 Runoff Depth=4.96"
Flow Length=90'
Tc=0.9 min
CN=98
Flow (cfs)
2
1
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 790 of 1174
Page 791
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 56
Summary for Subcatchment 14S: Proposed - East
[47] Hint: Peak is 325% of capacity of segment #3
Runoff = 52.06 cfs @ 12.02 hrs, Volume= 2.796 af, Depth= 4.96"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Area (ac) CN Description
4.420 98 Paved parking, HSG D
2.190 98 Roofs, HSG D
0.150 80 >75% Grass cover, Good, HSG D
6.760 98 Weighted Average
0.150 2.22% Pervious Area
6.610 97.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1.8 100 0.0100 0.92 Sheet Flow, PVMT
Smooth surfaces n= 0.011 P2= 2.50"
0.7 90 0.0100 2.03 Shallow Concentrated Flow,
Paved Kv= 20.3 fps
2.3 700 0.0050 5.09 16.00 Pipe Channel, PIPE
24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50'
n= 0.013 Concrete pipe, bends & connections
4.8 890 Total
Page 791 of 1174
Page 792
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 57
Subcatchment 14S: Proposed - East
Hydrograph
Runoff
55 52.06 cfs
NY-WestSeneca_NOAA14 24-hr S1 100-yr
50 Rainfall=5.20"
Runoff Area=6.760 ac
45
Runoff Volume=2.796 af
Runoff Depth=4.96"
40
Flow Length=890'
35 Tc=4.8 min
CN=98
Flow (cfs)
30
25
20
15
10
5
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 792 of 1174
Page 793
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 58
Summary for Subcatchment 15S: PDA-3
Runoff = 1.68 cfs @ 12.03 hrs, Volume= 0.082 af, Depth= 3.76"
Routed to Pond 18P : POND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Area (sf) CN Description
7,225 80 >75% Grass cover, Good, HSG D
4,150 98 Paved parking, HSG D
11,375 87 Weighted Average
7,225 63.52% Pervious Area
4,150 36.48% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry,
Subcatchment 15S: PDA-3
Hydrograph
Runoff
1.68 cfs
NY-WestSeneca_NOAA14 24-hr S1 100-yr
Rainfall=5.20"
Runoff Area=11,375 sf
Runoff Volume=0.082 af
Runoff Depth=3.76"
Tc=5.0 min
CN=87
Flow (cfs)
1
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 793 of 1174
Page 794
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 59
Summary for Pond 16P: OUTLET PIPE
Inflow Area = 59.695 ac, 80.80% Impervious, Inflow Depth = 4.57" for 100-yr event
Inflow = 141.36 cfs @ 12.05 hrs, Volume= 22.734 af
Outflow = 141.36 cfs @ 12.05 hrs, Volume= 22.734 af, Atten= 0%, Lag= 0.0 min
Primary = 141.36 cfs @ 12.05 hrs, Volume= 22.734 af
Routed to Link 13L : TOTAL
Routing by Dyn-Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
Peak Elev= 608.42' @ 12.05 hrs
Flood Elev= 612.00'
Device Routing Invert Outlet Devices
#1 Primary 603.56' 58.0" W x 94.0" H Box Culvert
L= 641.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 603.56' / 601.35' S= 0.0034 '/' Cc= 0.900
n= 0.013 Concrete pipe, bends & connections, Flow Area= 37.86 sf
Primary OutFlow Max=141.28 cfs @ 12.05 hrs HW=608.42' TW=0.00' (Dynamic Tailwater)
1=Culvert (Barrel Controls 141.28 cfs @ 8.02 fps)
Pond 16P: OUTLET PIPE
Hydrograph
Inflow
141.36 cfs Primary
150 141.36 cfs
140
Inflow Area=59.695 ac
130 Peak Elev=608.42'
120
110
58.0" x 94.0"
100 Box Culvert
Flow (cfs)
90
80
n=0.013
70 L=641.0'
60
50
S=0.0034 '/'
40
30
20
10
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 794 of 1174
Page 795
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 60
Summary for Pond 18P: POND
[44] Hint: Outlet device #1 is below defined storage
Inflow Area = 48.355 ac, 79.40% Impervious, Inflow Depth = 4.53" for 100-yr event
Inflow = 351.21 cfs @ 12.02 hrs, Volume= 18.262 af
Outflow = 90.10 cfs @ 12.23 hrs, Volume= 18.262 af, Atten= 74%, Lag= 12.2 min
Primary = 90.10 cfs @ 12.23 hrs, Volume= 18.262 af
Routed to Pond 16P : OUTLET PIPE
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Dyn-Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
Peak Elev= 612.22' @ 12.23 hrs Surf.Area= 77,027 sf Storage= 283,293 cf
Plug-Flow detention time= 107.0 min calculated for 18.261 af (100% of inflow)
Center-of-Mass det. time= 107.2 min ( 875.1 - 767.9 )
Volume Invert Avail.Storage Storage Description
#1 608.00' 471,250 cf Custom Stage Data (Prismatic)Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
608.00 57,300 0 0
614.50 87,700 471,250 471,250
Device Routing Invert Outlet Devices
#1 Primary 607.95' 48.0" Round Culvert
L= 685.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 607.95' / 604.56' S= 0.0049 '/' Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 12.57 sf
#2 Secondary 614.00' 50.0' long + 3.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Primary OutFlow Max=90.10 cfs @ 12.23 hrs HW=612.22' TW=607.69' (Dynamic Tailwater)
1=Culvert (Barrel Controls 90.10 cfs @ 8.36 fps)
Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=608.00' (Free Discharge)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 795 of 1174
Page 796
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 61
Pond 18P: POND
Hydrograph
351.21 cfs Inflow
Outflow
Primary
Inflow Area=48.355 ac Secondary
380
360 Peak Elev=612.22'
340
320 Storage=283,293 cf
300
280
260
240
Flow (cfs)
220
200
180
160 90.10 cfs
140 90.10 cfs
120
100
80
60
40
0.00 cfs
20
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 796 of 1174
Page 797
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 62
Summary for Link 12L: COSTCO
Inflow Area = 21.223 ac, 78.41% Impervious, Inflow Depth = 4.51" for 100-yr event
Inflow = 154.57 cfs @ 12.03 hrs, Volume= 7.978 af
Primary = 154.57 cfs @ 12.03 hrs, Volume= 7.978 af, Atten= 0%, Lag= 0.0 min
Routed to Pond 18P : POND
Primary outflow = Inflow, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
100-yr Primary Outflow Imported from COSTCO HYDROCAD 2026-04-13~Link 16L.hce
Link 12L: COSTCO
Hydrograph
Inflow
170
154.57 cfs Primary
154.57 cfs Inflow Area=21.223 ac
160
100-yr Primary Outflow
150 Imported from
140 COSTCO HYDROCAD 2026-04-13~Link 16L.hce
Area= 924,495 sf
130
78.41% Imperv.
120
110
100
Flow (cfs)
90
80
70
60
50
40
30
20
10
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 797 of 1174
Page 798
24-4113 WEST SENECA EXCAHNG NY-WestSeneca_NOAA14 24-hr S1 100-yr Rainfall=5.20"
Prepared by Carmina Wood Design Printed 7/13/2026
HydroCAD® 10.20-7a s/n 05019 © 2025 HydroCAD Software Solutions LLC Page 63
Summary for Link 13L: TOTAL
Inflow Area = 59.695 ac, 80.80% Impervious, Inflow Depth = 4.57" for 100-yr event
Inflow = 141.36 cfs @ 12.05 hrs, Volume= 22.734 af
Primary = 141.36 cfs @ 12.05 hrs, Volume= 22.734 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs
Link 13L: TOTAL
Hydrograph
Inflow
141.36 cfs Primary
150 141.36 cfs
140
Inflow Area=59.695 ac
130
120
110
100
Flow (cfs)
90
80
70
60
50
40
30
20
10
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Time (hours)
Page 798 of 1174
Page 799
Page 799 of 1174
Page 800
ST
OP
OP
ST
OP
ST
614
615
6
61
88
17+ WHO PROPO
LE SED
158 SALE R
STOP ,000 ETA
STOP SF IL
0
7+0
ST
O
0 1
PATI
ST
ST +026
STOP
STOP
6+0
23+56
STOP
81+80
IO
PAT
STOP
0 1
STOP
STOP
23+
STOP
STOP
0 1
ST
10+ 00
GV
0
22+
15+
0 7+0
STOP
0 11 0
ST
+00 0 0 2 ST
STOP
STOP
+0 1+0
0 1
STOP
12+0 0 2
STOP
0 13+00 14
STOP STOP
STOP
0+0
ST
6+0
STOP
0 1
STOP
9+0
0 1
ST
0 1
STOP
GV
STOP
STOP STOP
8+0
STOP
0
0 1
15+
ST
7+00
STOP
STOP
STOP STOP
16+
00
14+ST
00
STOP
STOP
ST ST
15+
ST
ST
00
14+ ST
+00
STOP STOP STOP STOP STOP STOP STOP 00 STOP
13+
STOP STOP
10+00 11+00 12+00 13
00
ST
STOP
STOP
ST
12+
STOP
STOP
STOP
STOP
ST
00 ST
STOP
ST ST ST 11+
STOP
00
STOP
STOP
10
+0
EX. OFFICE
0
7,980 SF
STOP
STOP
ST ST ST
STOP
GV
OVERALL STORM MAP NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
250 0 250 500Ft.
SCALE: 1"=100' 250'
Page 800 of 1174
Page 801
Page 801 of 1174
Page 802
DA CB 1 22+
S
0.05 AC DA CB 15 ST
00
ST
1.37 AC
00
STOP ST
ST
ST
ST
DA CB 8
15+
0.09 AC
00
DA CB 13
ST
ST
10+ 21+
17+
ST
STOP
00 0.04 AC 0 0
STOP
0.07 AC ST
DA CB 38
ST
STOP
DA CB 2
STOP
11+0 DA CB 36
ST
STOP
ST
20+
ST
STOP
0 0
0.04 AC 14
+0
STOP
ST 00 0.02 AC
DA CB 6 0.94 AC
STOP
ST
12+0
ST
ST
STOP
00
0 ST
19+
13+00
+
0.13 AC 00
ST 16
ST
DA CB 5
ST
STOP
ST ST
DA CB 37
GV
STOP
STOP
0.02 AC STOP ST
STOP
ST
0.01 AC
ST
ST ST
00
ST
DA CB 3
15+
STOP
DA CB 4 ST
DA CB 35
1.74 AC
STOP
STOP
0.04 AC ST DA CB 34 STOP
ST
ST
0.05 AC
ST
3.36 AC
STOP
STOP
ST
ST
ST
00
ST
DA W
ST
14+
ST
ST
ST
ST
ST
ST
STOP STOP STOP STOP STOP STOP STOP STOP STOP
ST +00
13
STOP
ST ST ST
STOP
STOP
STOP
STOP
DA CB 32 DA CB 33
ST
0.03 AC 1.57 AC
ST
ST
STOP
ST
12+00
DA CB 31
ST
STOP
0.00 AC
ST
DA CB 28
DA CB 30
ST
4.18 AC
ST 0.05 AC DA CB 29
ST
ST 11+00
ST 0.02 AC DA CB
ST
ST ST ST ST ST ST ST ST
STOP 1.87
ST ST ST ST
ST
GV
10+00
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHE
STORM MAP CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURAC
100 0 100 200Ft.
SCALE: 1"=100' 100'
Page 802 of 1174
Page 803
Page 803 of 1174
Page 804
0.05 AC DA CB 15 S S
0.05 AC
ST
ST
0.09 AC
00
21+
17+
00 ST
STOP
DA CB 18
ST
STOP
DA CB 38 0.75 AC
20+
ST 00 0.02 AC
STOP
+00
19+
00
ST 16
ST
DA CB 37 18+
00
0.01 AC DA CB 20
00
ST 17+0
DA CB 19 0 0.16 AC
15+
ST
DA CB 35
0.12 AC 16+
0.05 AC 00ST
STOP
DA CB 21 ST
15+
DA CB 23
00
DA WET POND 0.17 AC 00
ST
14+
2.53 AC ST 0.13 AC
DA CB 22 14+
00
ST ST
0.03 AC ST DA CB 25
STOP 13+
00
ST ST
0.17 AC
DA CB 24 ST
ST ST
ST
ST ST 12+
0.17 AC 00
STOP
STOP
DA CB 33
ST
ST ST
STOP
ST
ST
ST
ST 1.57 AC 11+
ST
00
STOP
ST ST ST ST ST
STOP
ST
DA CB 26
ST
10
ST
STOP
1.30 AC ST +0
0
DA CB 29
0.02 AC DA CB 27 EX. OFFICE
7,980 SF
ST
1.87 AC
ST
STOP
STOP
ST ST ST ST ST ST ST
STOP
STORM MAP NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHE
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURAC
100 0 100 200Ft.
SCALE: 1"=100' 100'
Page 804 of 1174
Page 805
Page 805 of 1174
Page 806
1.63 AC
614
615
616
ST
DA CB 10 ST
88
0.08 AC
17+
STOP
STOP
DA CB 11
00
ST
17+
DA CB 9 ST
0.06 AC
IO
PAT
1.88 AC
ST
ST
ST
TOP S
STOP
DA CB 12 DA CB 16
STOP
ST 23+56
ST 6
ST
8+2
00
IO
0.04 AC 1.33 AC
PAT
16+
STOP
01
DA CB 7
ST 18+0
STOP
STOP
STOP 23+ ST
0.09 AC STOP 00 ST DA CB 14
DA CB 17
ST
DA CB 1
ST
ST
0.05 AC DA CB 15
GV
ST
22+
00 0.05 AC
ST
1.37 AC
00
STOP ST
ST
ST
ST
DA CB 8
15+
0.09 AC
00
DA CB 13
ST
ST
10+ 21+
17+
ST
STOP
00 0.04 AC 00 STOP
0.07 AC ST
DA CB 38
ST
STOP
DA CB 2
STOP
11+0 DA CB 36
ST
STOP
ST
20+
ST
STOP
0 0
0.04 AC 14
+0
STOP
ST 00 0.02 AC
DA CB 6 0.94 AC
STOP
ST
12+0 ST
ST
STOP
+00
0 ST
19+
13+00 0.13 AC 00
ST 16
ST
ST
STOP
ST DA CB 5 ST
DA CB 37
STOP
STOP
0.02 AC STOP STOP ST
ST
0.01 AC
ST
ST ST
00
ST
DA CB 3 DA CB 19
15+
STOP
DA CB 4 ST
DA CB 35
1.74 AC
STOP
STOP
0.04 AC ST DA CB 34 STOP
0.12 AC
ST
ST
0.05 AC
ST
3.36 AC
STOP
STOP
ST
ST
STORM MAP NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHER
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
SCALE: 1"=100' 100 0 100 200Ft.
100'
Page 806 of 1174
Page 807
Page 807 of 1174
Page 808
OP
ST
DA CB 42
1.63 AC
DA CB 41 DA CB 39
1.72 AC 2.18 AC
ST
ST WHO PROPO
LE SED
158 SALE R
ST ,000 ET
SF
ST
ST
ST
ST
B 12 DA CB 16
ST 6
2
IO
AC 1.33 AC DA COSTCO
018+
PAT
ST 18+0
STOP
ST
DA CB 14 21.46 AC
DA CB 17
ST
0.05 AC DA CB 15
ST ST
0.05 AC
ST
ST
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTH
STORM MAP CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURAC
100 0 100 200Ft.
SCALE: 1"=100' 100'
Page 808 of 1174
Page 809
Page 809 of 1174
Page 810
Page 810 of 1174
Page 811
Page 811 of 1174
Page 812
Page 812 of 1174
Page 813
Page 813 of 1174
Page 814
Green Infrastructure & Water Quality Calculations
Page 814 of 1174
Page 815
Page 815 of 1174
Page 816
West Seneca Exchange - Orchard Park Rd, Slade Ave, Ridge Rd
Town of West Seneca, Erie County, New York
WATER QUALITY REQUIRED FOR PROPOSED DEVELOPMENT AREA Area, Acres = 53
(Note: Reference Chap. 9 NYSDEC Stormwater Design Manual)
"Redevelopment Activity", Acres = 47.75 "New development", Acres = 5.25
(existing, disturbed impervious area)
Total proposed impervious, Acres = 47.00 Adjusted impervious, Acres = 11.19
"New" impervious, Acres = -0.75 (25% redevelopment, 100% new development)
Water Quality Volume (WQv) WQv=(P*Rv*A)/12
Where: P=90% Rainfall Event Number P= 1
Rv= 0.05+0.009*(I) Rv= 0.24
IC=Impervious Cover, Acres IC= 11.19
I=Impervious Cover (%) I= 21
A=Runoff Area, Acres A= 53
WQv (ac-ft)= 1.060
WQv (cf)= 46,174
RRv PROVIDED FOR PROPOSED DEVELOPMENT AREA (See NYSDEC worksheets)
WQv, cf RRv, cf
Min. RRv Req'd, cf = 0 RRv, none required 0 0
Min. RRv Req'd, ac-ft = 0.000 WQv, Wet Pond 46,174 0
TOTAL, cf 46174 0
TOTAL, ac-ft 1.060 0.000
WQ & RR SUMMARY (ac-ft):
TOTAL WATER QUALITY PROVIDED FOR PROPOSED DEVELOPMENT AREA 1.060
IS WATER QUALITY VOLUME REQUIREMENT MET? Yes
(WQv provided equal to or greater than WQv required)
IS RUNOFF REDUCTION VOLUME REQUIREMENT MET? Yes
(RRv provided equal to or greater than Min. RRv required)
Page 816 of 1174
Page 817
Step 2 - Calculate Water Quality Volume
Is this project subject to Section 4.3 of the NYS Design Manual for Enhanced Phosphorus
Removal? No
What is the nature of this construction project? Redevelopment with no increase in impervious area
Design Point: 1
Enter 90% Rainfall Event as P
P= 1.00 inches
Calculate Required WQv
Contributing Percent
Drainage Area Impervious Area WQv SMP
Area Impervious Rv
Number (Acres) (cf) Description
(Acres) %
1 53.00 11.20 21 0.24 46,210
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Total 53.00 11.20 21 0.24 46210 Required WQv
Page 817 of 1174
Page 818
Step 2 - Calculate Water Quality Volume
Is this project subject to Section 4.3 of the NYS Design Manual for Enhanced Phosphorus
Removal? No
What is the nature of this construction project? Redevelopment with no increase in impervious area
Design Point: 1
Enter 90% Rainfall Event as P
P= 1.00 inches
Calculate Required WQv
Contributing Percent
Drainage Area Impervious Area WQv SMP
Area Impervious Rv
Number (Acres) (cf) Description
(Acres) %
1 53.00 11.20 21 0.24 46,210
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Total 53.00 11.20 21 0.24 46210 Required WQv
Page 818 of 1174
Page 819
Stormwater Ponds
Design Point: 1
Enter Site Data For Drainage Area to be Treated by Practice
Contributing Impervious Percent
Drainage Area WQv Precipitation
Area Area Impervious Rv Description
Number (cf) (in)
(Acres) (Acres) %
1 53.00 11.20 21 0.24 46,210 1.00 0
Select pond type Wet Pond
Design Criteria
Is the pond located within jurisdictional waters? No
Enter the natural slope of the pond area (%) 2
Enter underlying soil infiltration rate (based on
0
geotechnical testing, refer to Appendix D).
Has an impermeable liner been provided? No
Is the pond located within a sole source aquifer? No
Is the pond located within a designated hotspot? No
Enter depth to seasonal high water table (ft) 5
Enter depth to sound bedrock (ft) 5
List any drainage areas treated by other practices Additional
0
that will be directed to this practice. Areas
Is the contributing area less than the minimum
No
contributing area?
Will the pond discharge to trout waters? No
Has a controlled outlet been provided? Yes
Has an emergency spillway been provided? Yes
Has pretreatment been provided per Section
Yes
6.1.3?
Enter freeboard depth (ft) 1
Enter side slopes above permanent pool (X:1) 4
Enter aquatic bench slope (%) 15
Enter aquatic bench slope to pond floor (X:1) 6.66
Enter min. aquatic bench width provided (ft) 10
Enter aquatic bench average width provided (ft) 15
Enter aquatic bench depth (inches) 1.5
Enter maintenance access slope (%) 5
Enter maintenance access width (ft) 20
Enter permanent pool depth (ft) 4
Minimum permanent pool depth per Water
4.00
Balance Calculation (ft)
Sizing Criteria
Value Units Notes
Required Water Quality Volume 46210 cf
Pretreatment WQv Provided 5000 cf
Permanent Pool WQv Provided 50000 cf
Extended Detention WQv Provided 0 cf
Determine the Water Quality Volume Treated
Water Quality Volume Treated 46,210 cf
Page 819 of 1174
Page 820
STORMWATER POLLUTION
PREVENTION PLAN
At
West Seneca Exchange
Former Seneca Mall, SE corner of Orchard Park Rd & Slade Ave
0 Orchard Park Road
West, Erie County, NY
Prepared for
Benchmark Streamline, LLC
4053 Maple Road
Amherst NY,14226
Prepared by
Carmina Wood Design
80 Silo City Row, Ste 100
Buffalo, NY 14203
Telephone: (716) 842-3165
Fax: (716) 842-0263
July 2026
Page 820 of 1174
Page 821
Page 821 of 1174
Page 822
Table of Contents
Section 101 - Scope
Section 102 - Project Name and Location
Section 103 - Operator’s Name and Address
Section 104 - Project Description
Section 105 - Runoff Coefficient, Soils and Rainfall Information
Section 106 - Name of Receiving Waters
Section 107 - Indian Country Lands
Section 108 - Endangered or Threatened Species
Section 109 - Critical Habitat
Section 110 – Historic Places
Section 111 - Wetlands and/or Other Surface Waters
Section 112 - Erosion and Sediment Controls
Section 112.1 - Stabilization Practices
Section 112.2 - Structural Practices
Section 112.3 - Sequence of Major Activities
Section 112.4 - Storm Water Management
Section 113 - Other Controls
Section 114 - Compliance with Federal, State and Local Regulations
Section 115 - Inspection and Maintenance Procedures
Section 116 - Inspection and Maintenance Report Forms
Section 117 - Other Record-Keeping Requirements
Section 118 - Spill Prevention Control and Countermeasures (SPCC) Plan
Section 118.1 - Materials Covered
Section 118.2 - Material Management Practices
Section 118.3 - Spill Prevention and Response Procedures
Section 119 - Control of Non-Storm Water Discharges
Section 120 – Storm Water Control Facility Maintenance
West Seneca Exchange
07/20/2026
Page 1 of 24
Page 822 of 1174
Page 823
Table of Contents (con’t)
Appendix A Site Location Map
Appendix B NYSDEC Electronic Notice of Intent (eNOI)
Appendix C MS4 SWPPP Acceptance Form
Appendix D NYSDEC SPDES General Permit for Stormwater Discharges from Construction Activity Permit No.
GP-0-25-001
Appendix E Forms
• Contractor’s Certification
• Owner/Operator Certification
• SWPPP Preparer Certification
Appendix F NYSDEC Notice of Termination (NOT)
Appendix G Construction Documents
Appendix H Soils Information
Appendix I Standard Erosion Control Details
Appendix J NYSDEC Stormwater Management Inspection Lists
Appendix K SHPO Clearence Letter
Appendix L NYSDEC Environmental Resource Mapper
West Seneca Exchange
07/20/2026
Page 2 of 24
Page 823 of 1174
Page 824
101 SCOPE
A. PURPOSE: Benchmark Streamline, LLC (BS) has placed an emphasis on following the New York State
Department of Environmental Conservation (NYSDEC) SPDES General Permit for Stormwater Discharges
from Construction Activity governing storm water discharges during construction, and in accordance with
erosion control practices. The Contractor’s participation in this program is mandatory and its non-
compliance is subject to various remedies, including without limitation, monetary set-offs, withholding
payments; reimbursement for costs, expenses (including reasonable attorney’s fees), fines and civil
penalties incurred by BS; and/or liquidated damages. This section provides a descriptive explanation of
BS’s Storm Water Pollution Prevention Program and required Contractor participation.
The Engineer of record for this project certifies that this SWPPP meets the requirements and is in
compliance with the New York State Stormwater Management Design Manual and latest NYSDEC Phase II
stormwater regulation requirements.
B. SPDES General Permit for Stormwater Discharges from Construction Activity: Regulations promulgated
by the NYSDEC to regulate the discharge of storm water from construction activities on sites where more
than one (1) acre of soil is disturbed. One of the ways to comply with these regulations for affected sites
is to request coverage under the General Permit for Construction Activities for New York State. In order
to use the General Permit, a Notice of Intent (NOI) form must be completed and electronically submitted
to the NYSDEC at least 5 business days prior to any earth-disturbing activities (this time frame may
increase to 60 business days if a full review of the SWPPP is determined necessary by the NYSDEC) and a
Storm Water Pollution Prevention Plan (SWPPP) for the site must be prepared and followed during the
construction activities. Once a copy of the SPDES permit is received from NYSDEC, a copy will be included
in Appendix E of this report.
Approval from a regulated, traditional land use control MS4:
1. An owner or operator of a construction activity that is not subject to the requirements of a
regulated, traditional land use control MS4 must first develop a SWPPP in accordance with all
applicable requirements of this permit and then submit a completed NOI form to the NYSDEC.
2. An owner or operator of a construction activity that is subject to the requirements of a
regulated, traditional land use control MS4 must first develop a SWPPP in accordance with all
applicable requirements of this permit and then have its SWPPP reviewed and accepted by the
MS4 prior to submitting the NOI to the NYSDEC. The owner or operator shall have the “MS4
SWPPP Acceptance” form signed by the principal executive officer or ranking elected official
from the regulated, traditional land use control MS4, or by a duly authorized representative of
that person, and then submit that form along with the NOI to the address referenced under
“Notice of Intent (NOI) Submittal”.
C. RESPONSIBILITIES OF THE CONTRACTOR: The Contractor shall manage the discharge of storm water from
the site in accordance with the NYSDEC General Permit for Construction Activities conditions and the
following provisions of this section. The Operator shall be responsible for conducting the storm water
management practices in accordance with the permit. The Contractor shall be responsible for providing
qualified inspectors to conduct the inspections required by the SWPPP. The Contractor shall be
responsible for any enforcement action taken or imposed by federal, state, or local agencies, including
the cost of fines, construction delays, and remedial actions resulting from the Contractor’s failure to
comply with the permit provisions. It shall be the responsibility of the Contractor to make any changes to
the SWPPP necessary when the Contractor or any of his subcontractors elects to use borrow or fill or
material storage sites, either contiguous to or remote from the construction site, when such sites are
used solely for this construction site. Such sites are considered to be part of the construction site
covered by the permit and this SWPPP. Off-site borrow, fill, or material storage sites which are used for
West Seneca Exchange
07/20/2026
Page 3 of 24
Page 824 of 1174
Page 825
multiple construction projects are not subject to this requirement, unless specifically required by state or
local jurisdictional entity regulations. The Contractor should consider this requirement in negotiating with
earthwork subcontractors, since the choice of an off-site borrow, fill, or material storage site may impact
their duty to implement, make changes to, and perform inspections required by the SWPPP for the site.
D. NOTICE OF INTENT: The Operator has petitioned the NYSDEC for coverage under the storm water
discharges during construction at this site to be covered by the SPDES General Permit for Construction
Activity for the State of New York. A Notice of Intent (NOI) for coverage under this permit has been filed
by the Operator. The SWPPP must be prepared prior to submittal of the NOI form. The Operator will
require the Contractor to be a co-permittee with the Operator. The Contractor will be required to post
the NOI at the construction site along with any building permits.
E. CONTRACTOR CERTIFICATION & TRAINING: Proof of Training/Certification of the Contractor’s
designated individual shall be kept on site at all times.
F. REQUIREMENTS FOR THE GENERAL CONTRACTOR AND SUBCONTRACTOR(S): The General Contractor
and Subcontractor(s) shall sign the “Contractor’s Certification Statement” (located in the Appendix of this
report) verifying they have been instructed on how to comply with and fully understand the requirements
of the SPDES General Permit for Construction Activity for the State of New York and the SWPPP. These
certifications must be signed, by a responsible corporate officer or other party meeting the “Signatory
Requirements” of the SPDES General Permit, on behalf of each entity, prior to the beginning of any
construction activities.
G. STORM WATER POLLUTION PREVENTION PROGRAM LOCATION REQUIREMENTS: The SWPPP is meant to
be a working document that shall be maintained at the site of the Construction Activities at all times
throughout the project, shall be readily available upon request by the Operator’s personnel or NYSDEC or
any other agency with regulatory authority over storm water issues, and shall be kept on-site until the
site complies with the Final Stabilization section of this document. A sign or other notice must be posted
near the main entrance of the construction site which contains a completed NOI, the location of the
SWPPP and the name and phone number of a contact person responsible for scheduling SWPPP viewing
times, and any other state specific requirements. Disturbances greater than 5-acres requires MS4 (Town
of West Seneca) approval.
H. INSPECTIONS AND RECORD-KEEPING:
A. General Construction Site Inspection and Maintenance Requirements
1. The owner or operator must ensure that all erosion and sediment control practices and
all post-construction stormwater management practices identified in the SWPPP are
maintained in effective operating condition at all times.
2. The terms of this permit shall not be construed to prohibit the State of New York from
exercising any authority pursuant to the ECL, common law or federal law, or prohibit
New York State from taking any measures, whether civil or criminal, to prevent
violations of the laws of the State of New York, or protect the public health and safety
and/or the environment.
B. Owner or operator Maintenance Inspection Requirements
1. The owner or operator shall inspect, in accordance with the requirements in the most
current version of the technical standard, New York State Standards and Specifications
for Erosion and Sediment Control, the erosion and sediment controls identified in the
West Seneca Exchange
07/20/2026
Page 4 of 24
Page 825 of 1174
Page 826
SWPPP to ensure that they are being maintained in effective operating condition at all
times.
2. For construction sites where soil disturbance activities have been temporarily suspended
(e.g. winter shutdown) and temporary stabilization measures have been applied to all
disturbed areas, the owner or operator can stop conducting the maintenance
inspections. The owner or operator shall begin conducting the maintenance inspections
in accordance with Part IV.B.1. of the General Permit as soon as soil disturbance
activities resume.
3. For construction sites where soil disturbance activities have been shut down with partial
project completion, the owner or operator can stop conducting the maintenance
inspections if all areas disturbed as of the project shutdown date have achieved final
stabilization and all post-construction stormwater management practices required for
the completed portion of the project have been constructed in conformance with the
SWPPP and are operational.
C. Qualified inspector Inspection Requirements
The owner or operator shall have a qualified inspector conduct site inspections in conformance
with the following requirements:
Note: The trained contractor identified in Part III.A.6 of the General Permit cannot conduct the
qualified inspector site inspections unless they meet the qualified inspector qualifications
included in Appendix A of the General Permit. In order to perform these inspections, the trained
contractor would have to be a:
• Licensed Professional Engineer,
• Certified Professional in Erosion and Sediment Control (CPESC),
• Registered Landscape Architect, or
• Someone working under the direct supervision of, and at the same company as, the
licensed Professional Engineer or Registered Landscape Architect, provided they have
received four (4) hours of Department endorsed training in proper erosion and sediment
control principles from a Soil and Water Conservation District, or other Department
endorsed entity.
1. A qualified inspector shall conduct site inspections for all construction activities identified in
Tables 1 and 2 of Appendix B of the General Permit, with the exception of:
a. The construction of a single family residential subdivision with 25% or less impervious
cover at total site build-out that involves a soil disturbance of one (1) or more acres of
land but less than five (5) acres and is not located in one of the watersheds listed in
Appendix C of the General Permit and not directly discharging to one of the 303(d)
segments listed in Appendix E of the General Permit;
b. The construction of a single family home that involves a soil disturbance of one (1) or
more acres of land but less than five (5) acres and is not located in one of the
watersheds listed in Appendix C and not directly discharging to one of the 303(d)
segments listed in Appendix E of the General Permit;
West Seneca Exchange
07/20/2026
Page 5 of 24
Page 826 of 1174
Page 827
c. Construction on agricultural property that involves a soil disturbance of one (1) or more
acres of land but less than five (5) acres; and
d. Construction activities located in the watersheds identified in Appendix D of the
General Permit that involve soil disturbances between five thousand (5000) square feet
and one (1) acre of land.
2. Unless otherwise notified by the Department, the qualified inspector shall conduct site
inspections in accordance with the following timetable:
a. For construction sites where soil disturbance activities are on-going, the qualified
inspector shall conduct a site inspection at least once every seven (7) calendar days.
b. For construction sites where soil disturbance activities are on-going and the owner or
operator has received authorization in accordance with Part II.C.3 of the General
Permit to disturb greater than five (5) acres of soil at any one time, the qualified
inspector shall conduct at least two (2) site inspections every seven (7) calendar days.
The two (2) inspections shall be separated by a minimum of two (2) full calendar days.
Disturbances greater than 5-acres requires MS4 (Town of West Seneca) approval.
c. For construction sites where soil disturbance activities have been temporarily
suspended (e.g. winter shutdown) and temporary stabilization measures have been
applied to all disturbed areas, the qualified inspector shall conduct a site inspection
at least once every thirty (30) calendar days. The owner or operator shall notify the
Regional Office stormwater contact person (see contact information in Appendix F of
the General Permit) or, in areas under the jurisdiction of a regulated, traditional land
use control MS4, the MS4 (provided the MS4 is not the owner or operator of the
construction activity) in writing prior to reducing the frequency of inspections.
d. For construction sites where soil disturbance activities have been shut down with
partial project completion, the qualified inspector can stop conducting inspections if
all areas disturbed as of the project shutdown date have achieved final stabilization and
all post-construction stormwater management practices required for the completed
portion of the project have been constructed in conformance with the SWPPP and are
operational. The owner or operator shall notify the Regional Office stormwater contact
person or, in areas under the jurisdiction of a regulated, traditional land use control
MS4, the MS4 (provided the MS4 is not the owner or operator of the construction
activity). in writing prior to the shutdown. If soil disturbance activities are not resumed
within 2 years from the date of shutdown, the owner or operator shall have the
qualified inspector perform a final inspection and certify that all disturbed areas have
achieved final stabilization, and all temporary, structural erosion and sediment control
measures have been removed; and that all post-construction stormwater management
practices have been constructed in conformance with the SWPPP by signing the “Final
Stabilization” and “Post-Construction Stormwater Management Practice” certification
statements on the NOT. The owner or operator shall then submit the completed NOT
form to the address in Part II.A.1 of the General Permit.
3. At a minimum, the qualified inspector shall inspect all erosion and sediment control practices to
ensure integrity and effectiveness, all post-construction stormwater management practices
under construction to ensure that they are constructed in conformance with the SWPPP, all areas
of disturbance that have not achieved final stabilization, all points of discharge to natural
surface waterbodies located within, or immediately adjacent to, the property boundaries of the
construction site, and all points of discharge from the construction site.
West Seneca Exchange
07/20/2026
Page 6 of 24
Page 827 of 1174
Page 828
4. The qualified inspector shall prepare an inspection report subsequent to each and every
inspection. At a minimum, the inspection report shall include and/or address the following:
a. Date and time of inspection;
b. Name and title of person(s) performing inspection;
c. A description of the weather and soil conditions (e.g. dry, wet, saturated) at the time of
the inspection;
d. A description of the condition of the runoff at all points of discharge from the
construction site. This shall include identification of any discharges of sediment from
the construction site. Include discharges from conveyance systems (i.e. pipes, culverts,
ditches, etc.) and overland flow;
e. A description of the condition of all natural surface waterbodies located within, or
immediately adjacent to, the property boundaries of the construction site which receive
runoff from disturbed areas. This shall include identification of any discharges of
sediment to the surface waterbody;
f. Identification of all erosion and sediment control practices that need repair or
maintenance;
g. Identification of all erosion and sediment control practices that were not installed
properly or are not functioning as designed and need to be reinstalled or replaced;
h. Description and sketch of areas that are disturbed at the time of the inspection and
areas that have been stabilized (temporary and/or final) since the last inspection;
i. Current phase of construction of all post-construction stormwater management
practices and identification of all construction that is not in conformance with the
SWPPP and technical standards;
j. Corrective action(s) that must be taken to install, repair, replace or maintain erosion
and sediment control practices; and to correct deficiencies identified with the
construction of the post-construction stormwater management practice(s); and
k. Digital photographs, with date stamp, that clearly show the condition of all practices
that have been identified as needing corrective actions. The qualified inspector shall
attach paper color copies of the digital photographs to the inspection report being
maintained onsite within seven (7) calendar days of the date of the inspection. The
qualified inspector shall also take digital photographs, with date stamp, that clearly
show the condition of the practice(s) after the corrective action has been completed.
The qualified inspector shall attach paper color copies of the digital photographs to the
inspection report that documents the completion of the corrective action work within
seven (7) calendar days of that inspection.
5. Within one business day of the completion of an inspection, the qualified inspector shall notify
the owner or operator and appropriate contractor or subcontractor identified in Part III.A.6. of
any corrective actions that need to be taken. The contractor or subcontractor shall begin
implementing the corrective actions within one business day of this notification and shall
complete the corrective actions in a reasonable time frame.
West Seneca Exchange
07/20/2026
Page 7 of 24
Page 828 of 1174
Page 829
6. All inspection reports shall be signed by the qualified inspector. Pursuant to Part II.C.2 of the
General Permit, the inspection reports shall be maintained on site with the SWPPP.
Record Retention - The owner or operator shall retain a copy of the NOI, NOI Acknowledgment Letter,
SWPPP, MS4 SWPPP Acceptance form and any inspection reports that were prepared in conjunction with
this permit for a period of at least five (5) years from the date that the site achieves final stabilization.
This period may be extended by the Department, in its sole discretion, at any time upon written
notification.
I. SWPPP MODIFICATIONS: The inspection report should also identify if any revisions to the SWPPP are
warranted due to unexpected conditions. The SWPPP is meant to be a dynamic working guide that is to
be kept current and amended whenever there is a change in design, construction, operation, or
maintenance at the construction site that has or could have a significant effect on the discharge of
pollutants or when the plan proves to be ineffective in eliminating or significantly minimizing pollutant
discharges. The Contractor’s failure to modify or report deficiencies to the Operator will result in the
Contractor being liable for fines and construction delays resulting from any federal, state, or local agency
enforcement action. The MS4 (Town of West Seneca) must be notified, and approval is required of
changes to the SWPPP prior to applying said changes in the field.
J. FINAL STABILIZATION AND TERMINATION OF PERMIT COVERAGE: A site can be considered finally
stabilized when all soil disturbing activities have been completed and a uniform perennial vegetative
cover with a density of 85% for the unpaved areas and areas not covered by permanent structures has
been established or equivalent permanent stabilization measures have been established and the facility
no longer discharges storm water associated with construction activities and a Notice of Termination
(NOT) form filed by the Operator(s) with the NYSDEC. The Operator’s Project Manager must complete the
NOT. The NOT must be signed by the signatory (or equivalent position) on the NOI and subsequently
submitted to the appropriate agency. The MS4 (Town of West Seneca) must accept and sign the NOT prior
to submission to NYSDEC. The Operator’s Project Manager must provide a completed copy of the NOT to
the Contractor for inclusion in the SWPPP, which will then be optically scanned into the final SWPPP
document as required. This filing terminates coverage under the General Permit and terminates the
Contractor’s responsibility to implement the SWPPP, but the requirements of the SWPPP, including
periodic inspections, must be continued until the NOT is filed. The owner or operator shall also have the
qualified inspector perform a final site inspection prior to submitting the NOT to the Department. Final
payment and/or the release of retainage will be withheld until all provisions of the SWPPP have been
submitted, completed and accepted by the Operator.
102 PROJECT NAME AND LOCATION
West Seneca Exchange
Former Seneca Mall, SE corner of Orchard Park Rd & Slade Ave, 0 Orchard Park Road
Town of West Seneca, County of Erie
Easting: 190518.567
Northing: 4749144.180
Estimated Area of Site ≈ 56 acres
Estimated Area to be disturbed by Construction Activities ≈ 27.71 acres.
A general location map is included as Appendix A.
West Seneca Exchange
07/20/2026
Page 8 of 24
Page 829 of 1174
Page 830
103 OPERATOR’S NAME AND ADDRESS
Benchmark Streamline, LLC
4053 Maple Road
Amherst, NY 14226
Contact Person: Jared Lemankiewicz
Telephone: 716-876-0160
104 PROJECT DESCRIPTION
This project consists of the first phase of the redevelopment of the approximately 56 acre former Seneca
Mall property, located within the area bounded by Slade Avenue, Ridge Road, and Orchard Park Road in
the Town of West Seneca. The proposed redevelopment includes construction of an approximately
158,000 square foot commercial building to be occupied by Costco Wholesale, along with associated
parking, utilities, stormwater management facilities, and other supporting site improvements. This phase
also includes the primary infrastructure necessary to accommodate future phases and the ultimate full
build out of the redevelopment site.
Proposed site improvements include upgrades to the existing utility infrastructure, construction of a new
internal roadway network, parking facilities, site lighting, landscaping, and stormwater management
system designed for the full build out. These improvements are intended to provide the framework
required for future development throughout the remainder of the property.
The project site is currently occupied by the remnants of the former Seneca Mall and the existing Tops
Market grocery store. The Tops Market will remain operational throughout construction and will not be
impacted by the proposed redevelopment. Construction activities associated with the redevelopment are
expected to result in approximately 27.71 acres of land disturbance.
Soil disturbing activities will include:
A. Construction of temporary construction exit points
B. Clearing & grubbing of the site within disturbance limits
C. Installation of the detention basin & bioretention areas including topsoil & seed
D. Installation of storm sewer pipes and inlets
E. Construction of utilities
F. Construction of curb and parking lot
G. Final grading & landscaping
H. Construction of buildings
This project is owned by Benchmark Streamline, LLC and will be developed by the same. The work area
consists of approximately 27.71 acres for which erosion and sediment controls have been developed and
fully addressed in this written plan and the Erosion and Sediment Control Plans. See the construction
documents for additional details.
West Seneca Exchange
07/20/2026
Page 9 of 24
Page 830 of 1174
Page 831
105 RUNOFF COEFFICIENT, SOILS, AND RAINFALL INFORMATION
The initial runoff curve number for the pre-construction site is "CN" = 96. The post-construction runoff
curve number for the site will be "CN" = 96. The site is 56 acres of which approximately 27.71 acres will
be disturbed by construction activities.
See soils information located in Appendix H.
The site is in Erie County, which receives an average of approximately 45 inches rainfall annually with the
highest amounts of rainfall received in the months of May thru September. Annual snow for this area is
approximately 120 inches.
106 WATERS
Existing site drainage generally flows to two primary drainage areas. The western portion of the site
drains toward Slade Avenue, while the remainder of the site is collected by an existing network of catch
basins that ultimately discharge through a large storm sewer outlet located near the north central portion
of the site. This outlet conveys runoff directly to Cazenovia Creek.
107 INDIAN COUNTRY LANDS
This project is not located on Indian Lands.
108 ENDANGERED AND THREATENED SPECIES
No endangered or threatened species have been determined to be on the site.
109 CRITICAL HABITAT
See section 108 above.
110 HISTORIC PLACES
The assessed property is not shown on the NYSHPO map as an archeologically sensitive area. A review by
NYSHPO was conducted, a copy of their review and clearance letter is included in Appendix K of this
report.
111 WETLANDS AND/OR OTHER SURFACE WATERS
There are no known wetlands located on site. See Appendix L for NYSDEC Environmental Resource
Mapper.
112 EROSION AND SEDIMENT CONTROLS
112.1 STABILIZATION PRACTICES
Stabilization practices for this site include:
A. Land clearing activities shall be done only in areas where earthwork will be performed and shall
progress as earthwork is needed.
B. Use of stabilization method for all slopes having a slope greater than 1V:3H.
West Seneca Exchange
07/20/2026
Page 10 of 24
Page 831 of 1174
Page 832
C. Permanent seeding and planting of all unpaved areas using the hydromulching grass seeding
technique.
D. Mulching exposed areas.
E. Vegetation preservation in undisturbed areas.
F. Frequent watering to minimize wind erosion during construction.
a. For sites where 5 acres or more are disturbed at any one time: In areas where soil
disturbance activity has been temporarily or permanently ceased, temporary and/or
permanent soil stabilization measures shall be installed and/or implemented within
seven (7) days from the date the soil disturbance activity ceased. The soil stabilization
measures selected shall be in conformance with the most current version of the New
York Standards and Specifications for Erosion and Sediment Control.
b. The owner or operator shall prepare a phasing plan that defines maximum disturbed
area per phase and shows required cuts and fills.
c. The owner or operator shall install any additional measures needed to protect water
quality.
112.2 STRUCTURAL PRACTICES
Structural practices for this site include:
A. Inlet protection using a method detailed in the Construction Documents.
B. Perimeter protection using temporary silt fence/silt sock or silt sock.
C. Outlet protection using rip-rap stone and end sections.
D. Stabilized Construction Entrance.
E. Temporary stone wash off areas.
F. Storm sewer, curb/gutter.
G. Sediment traps and basins.
112.3 SEQUENCE OF MAJOR ACTIVITIES
The Contractor will be responsible for implementing the following erosion control and storm water
management control measures. The Contractor may designate these tasks to certain subcontractors as he
sees fit, but the ultimate responsibility for implementing these controls and ensuring their proper
functioning remains with the Contractor. The order of activities will be as follows:
A. Construct temporary construction exits at locations shown on the Demolition & Erosion Control
Plan Sheet.
B. Install perimeter silt fence/silt socks/silt sock in the locations shown on the Demolition & Erosion
Control Plan Sheet.
C. Clear & Grub site.
D. Installation of detention basin to act as sediment basins (do not install bioretention soil or
underdrains until stabilized)
West Seneca Exchange
07/20/2026
Page 11 of 24
Page 832 of 1174
Page 833
E. Commence site grading.
F. Disturbed areas of the site where construction activity has ceased for more than 14 days shall be
temporarily seeded and watered.
G. Construction of buildings
H. Installation of proposed utilities
I. Finalize pavement subgrade preparation.
J. Construct all curb, drainage inlets, storm sewer pipes and storm sewer manholes, as shown on
the plans. Install temporary inlet protection at the locations of all inlets.
K. Dust control.
L. Remove inlet protection around inlets and manholes no more than 48 hours prior to placing
stabilized base course.
M. Install base material as required for pavement.
N. Carry out final grading and seeding and planting.
O. Clean storm system following construction, clean detention basins of any silt and return to design
grades.
P. Remove silt fencing/silt sock only after all paving is complete and exposed surfaces are
stabilized.
Q. Remove temporary construction exits only prior to pavement construction in these areas.
Note: Sediment control storage during construction (traps & basins) during construction shall be 134 cy
per acre of disturbance per NYSDEC requirements.
112.4 STORMWATER MANAGEMENT
Existing site drainage generally flows to two primary drainage areas. The western portion of the site
drains toward Slade Avenue, while the remainder of the site is collected by an existing network of catch
basins that ultimately discharge through a large storm sewer outlet located near the north central portion
of the site. This outlet conveys runoff directly to Cazenovia Creek.
Stormwater runoff generated by the proposed redevelopment will be collected and conveyed through a
stormwater management system consisting of a wet pond, catch basins, yard drains, manholes, and
smooth interior HDPE storm sewer pipe. The proposed stormwater management infrastructure has been
designed to accommodate the ultimate full build out of the site and will provide the necessary
conveyance, water quality treatment, and peak flow attenuation for future development phases.
As a redevelopment project, the site is required to provide Water Quality Volume (WQv) treatment for 25
percent of the disturbed impervious area and 100 percent of any new impervious area in accordance with
NYSDEC requirements. The existing site contains approximately 47.75 acres of impervious cover, while the
proposed redevelopment will result in approximately 47.0 acres of impervious cover. Since the project
does not create any new impervious area, all proposed improvements are classified as disturbed
impervious area and are therefore subject to the 25 percent WQv treatment requirement. Because no
new impervious cover is being created, no Runoff Reduction Volume (RRv) is required for the project.
The proposed wet pond provides 100 percent of the required Water Quality Volume (WQv) treatment for
the redevelopment and also provides peak flow attenuation. Discharge from the wet pond is controlled
West Seneca Exchange
07/20/2026
Page 12 of 24
Page 833 of 1174
Page 834
through a 48 inch outlet pipe that connects to the existing storm sewer outlet system and ultimately
discharges to Cazenovia Creek. The stormwater management facilities have been designed to satisfy the
requirements of both the Town of West Seneca and the NYSDEC. The overall stormwater management
system, including water quality treatment and peak flow control, has been designed in accordance with
Chapters 4 and 9 of the NYSDEC Stormwater Management Design Manual.
Water Quality & Runoff Reduction Volume:
The proposed wet pond provides 100 percent of the required Water Quality Volume (WQv) treatment for
the redevelopment. See the Stormwater Drainage Calculations for additional information. The project does
not create any new impervious area, all proposed improvements are classified as disturbed impervious area
and are therefore subject to the 25 percent WQv treatment requirement. Because no new impervious cover
is being created, no Runoff Reduction Volume (RRv) is required for the project.
The NYSDEC Stormwater Management Design Manual requires a five-step process for Stormwater
Management Planning as outlined in Chapter 3. The five steps include:
1. Site planning to preserve natural features and reduce impervious cover.
• Existing vegetation to remain shall be protected from construction activities.
2. Calculation of Water Quality Volume (WQv=RRv) for site.
• See Stormwater Drainage Calculations.
3. Incorporation of Green Infrastructure techniques and standard SMPs with Runoff Reduction
Volume (RRv) capacity.
• The proposed wet pond provides 100 percent of the required Water Quality Volume
(WQv) treatment for the redevelopment. See the Stormwater Drainage Calculations for
additional information.
4. Use of standard SMPs where applicable, to treat the portion of water quality volume not
addressed by green infrastructure techniques and standard SMPs with RRv capacity.
• The project does not create any new impervious area, all proposed improvements are
classified as disturbed impervious area and are therefore subject to the 25 percent WQv
treatment requirement. Because no new impervious cover is being created, no Runoff
Reduction Volume (RRv) is required for the project.
5. Design of volume and peak rate control practices where required.
• See Stormwater Drainage Calculations.
The NYSDEC Stormwater Management Design Manual requires (5) five different criteria be considered
when designing a stormwater management system. Those criteria are Water Quality, Runoff
Reduction Volume, Channel Protection, Overbank Flooding and Extreme Storm Protection. Below is a
summary of each item and how it is incorporated into this project.
The NYSDEC requires stormwater runoff from development sites to be treated through approved green
infrastructure practices and stormwater management practices (SMPs) to improve water quality and
better replicate predevelopment hydrology.
As a redevelopment project, only 25% of the Water Quality Volume (WQv) generated from disturbed
impervious areas is required to be treated in accordance with the NYSDEC Stormwater Management
Design Manual. Because the proposed redevelopment results in a net decrease in impervious area, all new
West Seneca Exchange
07/20/2026
Page 13 of 24
Page 834 of 1174
Page 835
impervious surfaces associated with the project are classified as disturbed impervious areas, and no
Runoff Reduction Volume (RRv) is required.
The total required Water Quality Volume (WQv) for the development is 46,210 cubic feet (1.061 ac-ft).
This required treatment volume is fully provided by the proposed wet pond, which has been designed to
treat stormwater runoff from the site under full buildout conditions.
Therefore, the proposed stormwater management system satisfies the NYSDEC water quality treatment
and runoff reduction requirements for the development.
Channel Protection:
The NYSDEC requires that 24-Hour extended detention be provided for the proposed 1-year storm event.
A volume of 99,248 cf is accommodated in the Wet Pond at elevation 609.62. The existing runoff flow rate
is 103.89 cfs. The proposed runoff is 38.71 cfs. The flow rate has decreased by 65.18 cfs.
Overbank Flooding:
The NYSDEC requires that the 10-year proposed storm event be attenuated with detention and that the
outlet be restricted to the 10-year existing storm event. A volume of 185,425 cf is accommodated in the
Wet Pond at elevation 610.89. The existing runoff flow rate is 184.66 cfs. The proposed runoff is 87.97
cfs. The flow rate has decreased by 96.69 cfs.
Extreme Storm Protection:
The NYSDEC requires that the 100-year proposed storm event be attenuated with detention and that the
outlet be restricted to the 100-year existing storm event. A volume of 283,293 cf is accommodated in the
Wet Pond at elevation 612.22. The existing runoff flow rate is 317.14 cfs. The proposed runoff is 141.36
cfs. The flow rate has decreased by 175.78 cfs.
Refer to the engineer’s report for storm sewer design criteria, runoff summary tables and stormwater
drainage calculations.
113 OTHER CONTROLS
113.1 OFF-SITE VEHICLE TRACKING
A stabilized construction exit will be provided to help reduce vehicle tracking of sediments. Existing
paved areas will remain as long as possible and will be used for vehicle wash areas and to further aid in
the reduction of vehicle tracking of sediments. The paved streets adjacent to the site entrance shall be
inspected daily and swept as necessary to remove any excess mud, dirt, or rock tracked from the site.
Dump trucks hauling material to/from the construction site will be covered with a tarpaulin. The job site
superintendent will be responsible for seeing that these procedures are followed.
113.2 EXCAVATION SPOIL MATERIALS
Excavation spoil materials are generated during the excavation of the development’s building and utilities
installation. These materials must be properly managed to prevent them from contributing to storm
water discharges. The materials generated from the development of this project will be hauled off-site
or stockpiled for re-use in designated areas which will have temporary erosion & sediment control
measures installed. Any removal from site will be done under the necessary permits required by the local
governing agencies.
West Seneca Exchange
07/20/2026
Page 14 of 24
Page 835 of 1174
Page 836
113.3 DUST CONTROL
Minimizing wind erosion and controlling dust will be accomplished by one or more of the following
methods:
A. Frequent watering of excavation and fill areas.
B. Providing gravel or paving at entrance/exit drives, parking areas and transit paths.
113.4 WASTE DISPOSAL
If needed, all waste materials will be collected and stored in securely lidded metal dumpsters rented
from an approved waste management company. The dumpster will comply with all local and state solid
waste management regulations.
All trash and construction debris from the site will be deposited in the dumpsters. The dumpsters will be
emptied when full and then hauled to a NYSDEC approved landfill for proper disposal. No construction
waste will be buried on-site. All personnel will be instructed regarding the correct procedures for waste
disposal.
113.5 SANITARY WASTE
If needed, portable toilet units or field offices with toilet facilities connected to the municipal sanitary
sewer will be used for sanitary purposes. All portable toilet units will be emptied a minimum of once per
week by a licensed portable facility provided in compliance with local and state regulations.
113.6 CONCRETE WASTE FROM CONCRETE TRUCKS
A. Emptying of excess unhardened concrete and/or washout from concrete delivery trucks will be
allowed on the job site, but in either (1) specifically designated diked areas which have been
prepared to prevent contact between concrete and/or washout and storm water which will be
discharged from the site or (2) in locations where waste concrete will be poured into forms to
make rip-rap or other useful concrete products.
B. Hardened waste concrete from the designated diked areas described above will be disposed of in
accordance with applicable local and state regulations with regards to disposal of construction
debris.
113.7 HAZARDOUS SUBSTANCES & HAZARDOUS WASTE
A. All hazardous waste materials will be disposed of by the Contractor in the manner specified by
local, state, and/or federal regulations and by the manufacturer of such products. Site
personnel will be instructed in these practices by the job superintendent, who will also be
responsible for seeing these practices are followed. Material Safety Data Sheets (MSDS’s) for
each substance with hazardous properties that is used on the job site will be obtained and used
for the proper management of potential wastes that may result from these products. An MSDS
will be posted in the immediate area where such products are stored and/or used and another
copy of each MSDS will be maintained in the SWPPP file at the job site construction office. Each
employee who must handle a substance with hazardous properties will be instructed on the use
of MSDS sheets and the specific information in the applicable MSDS for the product he/she is
using, particularly regarding spill control techniques.
B. The contractor will implement the Spill Prevention Control and Countermeasures (SPCC) Plan
found within this SWPPP and will train all personnel in the proper cleanup and handling of spilled
West Seneca Exchange
07/20/2026
Page 15 of 24
Page 836 of 1174
Page 837
materials. No spilled hazardous materials of hazardous wastes will be allowed to come in
contact with storm water discharges. If such contact occurs, the storm water discharge shall be
contained on site until appropriate measures in compliance with state and federal regulations
are taken to dispose of such contaminated storm water. It shall be the responsibility of the job
superintendent to properly train all personnel in the use of the SPCC plan.
C. Any spills of hazardous materials which are in excess of the Reportable Quantities as defined by
the EPA regulations shall be immediately reported to the EPA National Response Center at 1-100-
424-1102. From SWPPP-9 “Reportable Quantity Release Form” must be filled out.
D. In order to minimize the potential for a spill of hazardous materials to come in contact with
storm water, the following steps will be implemented:
1. All materials with hazardous properties (such as pesticides, petroleum products,
fertilizers, detergents, construction chemicals, acids, paints, paint solvents, cleaning
solvents, additives for soil stabilization, concrete curing compounds and additives, etc.)
will be stored in a secure location, under cover, when not in use.
2. The minimum practical quantity of all such materials will be kept on the job site.
3. A spill control and containment kit (containing for example, absorbent such as kitty
litter or sawdust, acid neutralizing powder, brooms, dust pans, mops, rags, gloves,
goggles, plastic and metal trash containers, etc.) will be provided at the storage site.
4. All of the product in a container will be used before the container is disposed of. All
such containers will be triple rinsed with water prior to disposal. The rinse water used
in these containers will be disposed of in a manner in compliance with state and federal
regulations and will not be allowed to mix with storm water discharges.
5. All products will be stored in and used from the original container with the original
product label.
6. All products will be used in strict compliance with instructions on the product label.
7. The disposal of excess or used products will be in strict compliance with instructions on
the product label.
113.8 CONTAMINATED SOILS
A. Any contaminated soils (resulting from spills of materials with hazardous properties) which may
result from construction activities will be contained and cleaned up immediately in accordance
with the procedures given in the Spill Prevention Control and Countermeasures (SPCC) Plan and
in accordance with applicable state and federal regulations.
B. The job site superintendent will be responsible for seeing that these procedures are followed.
114 COMPLIANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS
The Contractor will obtain copies of any and all local and state regulations which are applicable to storm
water management, erosion control, and pollution minimization at this job site and will comply fully with
such regulations. The Contractor will submit written evidence of such compliance if requested by the
Operator or any agent of a regulatory body. The Contractor will comply with all conditions of the SPDES
General Permit for Construction Activity for the State of New York, including the conditions related to
West Seneca Exchange
07/20/2026
Page 16 of 24
Page 837 of 1174
Page 838
maintaining the SWPPP and evidence of compliance with the SWPPP at the job site and allowing
regulatory personnel access to the job site and to records in order to determine compliance.
The SWPPP for this site development project requires regulated MS4 approval from the Town of West
Seneca. All changes to the SWPPP must be approved by the Town of West Seneca prior to applying
changes to the SWPPP in the field.
This project demonstrates consideration of the future physical risks due to climate change by reducing
development below allowed zoning requirements to conserve, restore, or mimic natural processes that
reduce risk from flooding and erosion in accordance with the Community Risk and Resiliency Act (CRRA), 6
NYCRR 490 and associated guidance.
115 INSPECTION AND MAINTENANCE PROCEDURES
The following inspection and maintenance practices will be used to maintain erosion and sediment
controls and stabilization measures.
1. All control measures will be inspected by the owner/operator at least weekly and shall continue
until the site complies with the Final Stabilization section of this document (See Section 116).
2. All control measures will be inspected by a Qualified Professional at least weekly and shall
continue until the site complies with the Final Stabilization section of this document (See Section
116).
3. All measures will be maintained in good working order; if repairs or other measures are found to
be necessary, they will be initiated within 24 hours of report.
4. Built up sediment will be removed from silt fence/silt sock when it has reached one-third the
height of the fence.
5. Silt fence/silt socks will be inspected for depth of sediment, tears, etc., to see if the fabric is
securely attached to the fence posts, and to see that the fence posts are securely in the ground.
6. Temporary and permanent seeding and all other stabilization measures will be inspected for bare
spots, washouts, and healthy growth.
7. A maintenance inspection report will be made after each inspection. Copies of the report forms
to be completed by the inspector are included in this SWPPP.
8. The job site superintendent will be responsible for selecting and training the individuals who will
be responsible for these inspections, maintenance and repair activities, and filling out inspection
and maintenance reports.
9. Personnel selected for the inspection and maintenance responsibilities will receive training from
the job site superintendent. They will be trained in all the inspection and maintenance practices
necessary for keeping the erosion and sediment controls that are used onsite in good working
order. They will also be trained in the completion of, initiation of actions required by, and the
filing of the inspection forms. Documentation of this personnel training will be kept on site with
the SWPPP.
10. Disturbed areas and materials storage areas will be inspected for evidence of or potential for
pollutants entering stormwater systems.
West Seneca Exchange
07/20/2026
Page 17 of 24
Page 838 of 1174
Page 839
11. Report to the NYSDEC within 24 hours any noncompliance with the SWPPP that will endanger
public health or the environment. Follow up with a written report within 5 days of the
noncompliance event. The following events require 24 hour reporting: a) any unanticipated
bypass which exceeds any effluent limitation in the permit, b) any upset which exceeds any
effluent limitation in the permit, and c) a violation of a maximum daily discharge limitation for
any of the pollutants listed by the NYSDEC in the permit to be reported within 24 hours. The
written submission must contain a description of the non-compliance and its cause; the period of
non-compliance, including exact dates and times, and if the non-compliance has not been
corrected, the anticipated time it is expected to continue; and steps taken or planned to reduce,
eliminate, and prevent recurrence of the non-compliance.
12. Releases of hazardous substances or oil in excess of reportable quantities (as established under
40 CFR 110, 40 CFR 117 or 40 CFR 302) must be reported.
Upon completion of construction, the property owner is responsible for ensuring that the stormwater
facilities are regularly inspected and maintained. Maintenance and inspection procedures are as follows.
1. On a quarterly basis and following significant rainfall events or snow-melts, perform the
following:
• Inspect catch basins, storm manholes, treatment structures, storm piping and
stormwater pond for debris and accumulation of sediment.
• Remove and properly dispose of any collected debris and sediment in accordance with
applicable state, federal and local regulations.
• Flush piping with water if necessary to remove accumulated sediment.
• Bioretention areas shall be maintained per the NYSDEC Maintenance and Management
Checklist included in this SWPPP.
• Check all stone outfall structures for erosion and re-stone if necessary to prevent
further erosion.
• Inspect grassed/landscaped areas for un-vegetated areas or areas with less than 85%
healthy stand of grass and reseed and mulch as necessary. Water daily if reseeded in
July and August.
• A record of all inspections should be kept.
2. Maintain all lawn areas by regular mowing, including the grassed slopes of the stormwater pond
and any grass swales. Any eroded areas shall be regarded, seeded and mulched immediately.
116 INSPECTION AND MAINTENANCE REPORT FORMS
Once installation of any required or optional erosion control device or measure has been implemented,
inspections shall be performed by a Qualified Professional at least once every seven (7) calendar days.
For construction sites where soil disturbance activities are on-going and the owner or operator has
received authorization in accordance with Part II.C.3 of the General Permit to disturb greater than five
(5) acres of soil at any one time, the qualified inspector shall conduct at least two (2) site inspections
every seven (7) calendar days. The two (2) inspections shall be separated by a minimum of two (2) full
calendar days. The owner and contractor shall obtain from the MS4 an approval for disturbing more than
five-acres at any given time. For construction sites where active construction has been suspended,
inspection frequency under the general permit can be reduced to once every 30 days, provided temporary
West Seneca Exchange
07/20/2026
Page 18 of 24
Page 839 of 1174
Page 840
stabilization measures have been applied to all disturbed areas. The forms found in this SWPPP shall be
used by the inspectors to inventory and report the condition of each measure to assist in maintaining the
erosion and sediment control measures in good working order.
These report forms shall become an integral part of the SWPPP and shall be made readily accessible to
governmental inspection officials, the Operator’s Engineer, and the Operator for review upon request
during visits to the project site. In addition, copies of the reports shall be provided to any of these
persons, upon request, via mail or facsimile transmission. Inspection and maintenance report forms are to
be maintained by the permittee for five years following the final stabilization of the site.
117 OTHER RECORD-KEEPING REQUIREMENTS
The Contractor shall keep the following records related to construction activities at the site:
• Dates when major grading activities occur and the areas which were graded
• Dates and details concerning the installation of structural controls
• Dates when construction activities cease in an area
• Dates when an areas is stabilized, either temporarily or permanently
• Dates of rainfall and the amount of rainfall
• Dates and descriptions of the character and amount of any spills of hazardous materials
• Records of reports filed with regulatory agencies if reportable quantities of hazardous materials
spilled
118 SPILL PREVENTION CONTROL AND COUNTERMEASURES (SPCC) PLAN
118.1 MATERIALS COVERED
The following materials or substances are expected to be present onsite during construction:
• Concrete/Additives/Wastes
• Cleaning solvents
• Sanitary wastes
• Detergents
• Petroleum based products
• Paints/Solvents
• Pesticides
• Solid and construction wastes
• Acids
• Fertilizers
• Soil stabilization additives
118.2 MATERIAL MANAGEMENT PRACTICES
The following are the material management practices that will be used to reduce the risk of spills or
other accidental exposure of materials and substances to stormwater runoff. The job site superintendent
will be responsible for ensuring that these procedures are followed.
A. Good Housekeeping
West Seneca Exchange
07/20/2026
Page 19 of 24
Page 840 of 1174
Page 841
The following good housekeeping practices will be followed onsite during the construction
project.
1. An effort will be made to store only enough products required to do the job.
2. All materials stored onsite will be stored in a neat, orderly manner and, if possible,
under a roof or in a containment area. At a minimum, all containers will be stored with
their lids on when not in use. Drip pans shall be provided under all dispensers.
3. Products will be kept in their original containers with the original manufacturer's label
in legible condition.
4. Substances will not be mixed with one another unless recommended by the
manufacturer.
5. Whenever possible, all of a product will be used up before disposing of the container.
6. Manufacturer's recommendations for proper use and disposal will be followed.
7. The job site superintendent will be responsible for daily inspections to ensure proper
use and disposal of materials.
B. Hazardous Products
These practices will be used to reduce the risks associated with hazardous materials. Material
Safety Data Sheets (MSDS's) for each substance with hazardous properties that is used on the job
site will be obtained and used for the proper management of potential wastes that may result
from these products. An MSDS will be posted in the immediate area where such product is stored
and/or used and another copy of each MSDS will be maintained in the SWPPP file at the job site
construction trailer office. Each employee who must handle a substance with hazardous
properties will be instructed on the use of MSDS sheets and the specific information in the
applicable MSDS for the product he/she is using, particularly regarding spill control techniques.
1. Products will be kept in original containers with the original labels in legible condition.
2. Original labels and material safety data sheets (MSDS's) will be procured and used for
each material.
3. If surplus product must be disposed of, manufacturer's or local/state/federal
recommended methods for proper disposal will be followed.
4. A spill control and containment kit (containing for example, absorbent such as kitty
litter or sawdust, acid neutralizing powder, brooms, dust pans, mops, rags, gloves,
goggles, plastic and metal trash containers, etc.) will be provided at the storage site.
5. All of the product in a container will be used before the container is disposed of. All
such containers will be triple rinsed with water prior to disposal. The rinse water used
in these containers will be disposed of in a manner in compliance with state and federal
regulations and will not be allowed to mix with storm water discharges.
C. Hazardous Waste
All hazardous waste materials will be disposed of by the Contractor in the manner specified by
local, state, and/or federal regulations and by the manufacturer of such products. Site
West Seneca Exchange
07/20/2026
Page 20 of 24
Page 841 of 1174
Page 842
personnel will be instructed in these practices by the job site superintendent, who will also be
responsible for seeing that these practices are followed.
D. Product Specific Practices
The following product specific practices will be followed on the job site.
1. Petroleum Products
All onsite vehicles will be monitored for leaks and receive regular preventative
maintenance to reduce the chance of leakage. Petroleum products will be stored in
tightly sealed containers which are clearly labeled. Any petroleum storage tanks stored
onsite will be located within a containment area that is designed with an impervious
surface between the tank and the ground. The secondary containment must be
designed to provide a containment volume that is equal to 110% of the volume of the
largest tank. Drip pans shall be provided for all dispensers. Any asphalt substances
used onsite will be applied according to the manufacturer's recommendations. The
location of any fuel tanks and/or equipment storage areas must be identified on a plan
by the contractor once the locations have been determined.
2. Fertilizers
Fertilizers will be applied only in the minimum amounts recommended by the
manufacturer. Once applied, fertilizer will be worked in the soil to limit exposure to
stormwater. Storage will be in a covered shed. The contents of any partially used bags
of fertilizer will be transferred to a sealable plastic bin to avoid spills.
3. Paints, Paint Solvents, and Cleaning Solvents
All containers will be tightly sealed and stored when not in use. Excess paint and
solvents will not be discharged to the storm sewer system but will be properly disposed
of according to manufacturer's instructions or state and federal regulations.
4. Concrete Wastes
Concrete trucks will be allowed to wash out or discharge surplus concrete or drum wash
water on the site, but only in either (1) specifically designated diked areas which have
been prepared to prevent contact between the concrete and/or wash out and storm
water which will be discharged from the site or (2) in locations where waste concrete
can be poured into forms to make riprap or other useful concrete products.
The hardened residue from the concrete wash out diked areas will be disposed of in the
same manner as other non-hazardous construction waste materials or may be broken up
and used on site as deemed appropriate by the Contractor. The job site superintendent
will be responsible for seeing that these procedures are followed.
All concrete wash out areas will be located in an area where the likelihood of the area
contributing to storm water discharges is negligible. If required, additional BMPs must
be implemented to prevent concrete wastes from contributing to storm water
discharges. The location of concrete wash out area(s) must be identified on a plan by
the contractor once the locations have been determined. In addition, a standard detail
on the construction of the concrete wash out shall be included on this plan.
E. Solid and Construction Wastes
West Seneca Exchange
07/20/2026
Page 21 of 24
Page 842 of 1174
Page 843
All waste materials will be collected and stored in an appropriately covered container and/or
securely lidded metal dumpster rented from a local waste management company which must be
a solid waste management company licensed to do business in New York and the Town of West
Seneca. The dumpster will comply with all local and state solid waste management regulations.
All trash and construction debris from the site will be deposited in the dumpster. The dumpster
will be emptied a minimum of twice per week or more often if necessary, and the trash will be
hauled to a landfill approved by the NYSDEC. No construction waste materials will be buried on
site. All personnel will be instructed regarding the correct procedures for waste disposal.
All waste dumpsters and roll-off containers will be located in an area where the likelihood of the
containers contributing to storm water discharges is negligible. If required, additional BMPs must
be implemented, such as sandbags around the base, to prevent wastes from contributing to
storm water discharges. The location of waste dumpsters and roll-off containers must be
identified on a plan by the contractor once the locations have been determined.
F. Sanitary Wastes
Portable toilet units or field offices with toilet facilities connected to the municipal sanitary
sewer will be used for sanitary purposes. All portable toilet units will be emptied a minimum of
once per week by a licensed portable facility provided in compliance with local and state
regulations.
All sanitary waste units will be located in an area where the likelihood of the unit contributing to
storm water discharges is negligible. If required, additional BMPs must be implemented, such as
sandbags around the base, to prevent wastes from contributing to storm water discharges. The
location of sanitary waste units must be identified on a plan by the contractor once the locations
have been determined.
G. Contaminated Soils
Any contaminated soils (resulting from spills of materials with hazardous properties) which may
result from construction activities will be contained and cleaned up immediately in accordance
with the procedures given in the Materials Management Plan and in accordance with applicable
state and federal regulations.
118.3 SPILL PREVENTION AND RESPONSE PROCEDURES
The Contractor will train all personnel in the proper handling and cleanup of spilled materials.
No spilled hazardous materials or hazardous wastes will be allowed to come in contact with
storm water discharges. If such contact occurs, the storm water discharge will be contained on
site until appropriate measures in compliance with state and federal regulations are taken to
dispose of such contaminated storm water. It shall be the responsibility of the job site
superintendent to properly train all personnel in spill prevention and clean up procedures.
A. In order to minimize the potential for a spill of hazardous materials to come into contact with
storm water, the following steps will be implemented:
1. All materials with hazardous properties (such as pesticides, petroleum products,
fertilizers, detergents, construction chemicals, acids, paints, paint solvents, cleaning
solvents, additives for soil stabilization, concrete curing compounds and additives, etc.)
West Seneca Exchange
07/20/2026
Page 22 of 24
Page 843 of 1174
Page 844
will be stored in a secure location, with their lids on, preferably under cover, when not
in use.
2. The minimum practical quantity of all such materials will be kept on the job site.
3. A spill control and containment kit (containing, for example, absorbent materials, acid
neutralizing powder, brooms, dust pans, mops, rags, gloves, goggles, plastic and metal
trash containers, etc.) will be provided at the storage site.
4. Manufacturer's recommended methods for spill cleanup will be clearly posted and site
personnel will be trained regarding these procedures and the location of the information
and cleanup supplies.
B. In the event of a spill, the following procedures should be followed
1. All spills will be cleaned up immediately after discovery.
2. The spill area will be kept well ventilated and personnel will wear appropriate
protective clothing to prevent injury from contact with the hazardous substances.
3. The project manager and the Engineer of Record will be notified immediately.
Spills of toxic or hazardous materials will be reported to the appropriate federal, state,
and/or local government agency, regardless of the size of the spill. Spills of amounts
that exceed Reportable Quantities of certain substances specifically mentioned in
federal regulations (40 CFR 110, 40 CFR 117, and 40 CFR 302) must be immediately
reported to the EPA National Response Center, telephone 1-100-424-1102. From SWPPP-
9 “Reportable Quantity Release Form” must be filled out.
4. If the spill exceeds a Reportable Quantity, the SWPPP must be modified within seven (7)
calendar days of knowledge of the discharge to provide a description of the release, the
circumstances leading to the release, and the date of the release. The plans must
identify measures to prevent the recurrence of such releases and to respond to such
releases.
C. The job site superintendent will be the spill prevention and response coordinator. He will
designate the individuals who will receive spill prevention and response training. These
individuals will each become responsible for a particular phase of prevention and response. The
names of these personnel will be posted in the material storage area and in the office trailer
onsite.
119 CONTROL OF NON-STORM WATER DISCHARGES
Certain types of discharges are allowable under the NYSDEC SPDES General Permit for Construction
Activity for the State of New York, and it is the intent of this SWPPP to allow such discharges. These
types of discharges will be allowed under the conditions that no pollutants will be allowed to come in
contact with the water prior to or after its discharge. The control measures which have been outlined
previously in this SWPPP will be strictly followed to ensure that no contamination of these non-storm
water discharges takes place. The following allowable non-storm water discharges which may occur at
the job site include:
A. Discharges from firefighting activities.
B. Fire hydrant flushings (see note below)
West Seneca Exchange
07/20/2026
Page 23 of 24
Page 844 of 1174
Page 845
C. Waters used to wash vehicles or control dust in order to minimize offsite sediment tracking.
D. Routine external building washdown which does not use detergents.
E. Pavement wash waters where spills or leaks of hazardous materials have not occurred or
detergents have not been used.
F. Air conditioning condensate.
G. Springs or other uncontaminated groundwater, including dewatering ground water infiltration.
H. Foundation or footing drains where no contamination with process materials such as solvents is
present.
Note: The Contractor shall discharge any super-chlorinated water from water distribution pipe
disinfection activities into sanitary sewer system
120 STORM WATER CONTROL FACILITY MAINTENANCE
The frequency of inspections for the Wet Pond shall match the frequencies listed on the
“Stormwater/Wetland Pond Construction Inspection Checklist” in Appendix J of the SWPPP.
The proposed catch basins, as per section 115, shall be inspected 4 times per year for removal of
floatable debris. Any silt buildup over 6” in depth shall be removed and disposed of properly off-site.
West Seneca Exchange
07/20/2026
Page 24 of 24
Page 845 of 1174
Page 846
Appendix A
Site Location Map
Page 846 of 1174
Page 847
Page 847 of 1174
Page 848
Erie County On-Line Mapping Application
PROJECT Legend
LOCATION Parcels
0 0.14 0.3 Miles This map is a user generated static output from
ERIE COUNTY
an Internet mapping site and is for reference only.
WGS_1984_Web_Mercator_Auxiliary_Sphere
DEPARTMENT OF ENVIRONMENT & PLANNING Data layers that appear on this map may or may 1: 9,028
THIS MAP IS NOT TO BE USED FOR NAVIGATION OFFICE OF GIS not be accurate, current, or otherwise reliable.
Page 848 of 1174
Page 849
Page 849 of 1174
Page 850
012345167189 7547974
!"#$%
&
'()*& +,-%&&&&./01.2314565654 & 7-%&&&&858/.883.200/115/
&
9-":9,"& 9-"%&&&&;5235248616.1.</<8& 9,"%&&&&8<326<<156/140868
=>!"#$%
?@A&B@CDE&FG&HAEG&BAIAJK
L"!%&MNOA
P%&HAEG&BAIAJK
'QRQS"%&TUVVFWX&BM
YZ&[C\N&DNC]AJG&CN&KJ^CI&OE&_OG@OI&CN&IAKN&KI&KNAK&_OG@&K&NKNA&KIÒKab&K&DAN`OG&`K[&cA&NAd\ONAe&OZ&G@A&EDAJOAE&OE&aOEGAe&KE
AIeKIfANAe&CN&G@NAKGAIAe&KIe&G@A&eADKNG`AIG&eAGAN`OIAE&G@A&KJ^CI&`K[&cA&@KN`Z\a&GC&G@A&EDAJOAE&CN&OGE&@KcOGKG3
YZ&[C\N&DNC]AJG&CN&KJ^CI&OE&_OG@OI&CN&IAKN&KI&KNAK&_OG@&NKNA&DaKIGE&KIegCN&EOfIOhJKIG&IKG\NKa&JC``\IO^AEb&G@A
AIiONCI`AIGKa&ÒDKJGE&`K[&IAAe&GC&cA&KeeNAEEAe3
?@A&DNAEAIJA&CZ&K&\IOd\A&fACaCfOJKa&ZAKG\NA&CN&aKIeZCN`&IAKN&K&DNC]AJGb&\IGC&OGEAaZb&eCAE&ICG&GNOffAN&K&NAd\ONA`AIG&ZCN&K
jkB&lMm&DAN`OG3&nAKeANE&KNA&KeiOEAeb&@C_AiANb&G@KG&G@ANA&OE&G@A&J@KIJA&G@KG&K&\IOd\A&ZAKG\NA&`K[&KaEC&E@C_&OI&KICG@AN
eKGK&aK[AN&oOA3&K&_AGaKIep&KIe&G@\E&cA&E\c]AJG&GC&DAN`OG&]\NOEeOJ^CI3
qaAKEA&NAZAN&GC&G@A&rjAAe&K&qAN`OGsr&GKc&ZCN&DAN`OG&OIZCN`K^CI&CN&CG@AN&K\G@CNOtK^CIE&NAfKNeOIf&G@AEA&IKG\NKa&NAEC\NJAE3
u#>%&YZ&[C\&KNA&JCIEOeANOIf&K&DNC]AJG&CN&KJ^CI&OIb&CN&IAKNb&K&_AGaKIe&CN&K&EGNAK`b&K&jkB&lMm&DAN`OG&`K[&cA&NAd\ONAe3
?@A&MIiONCI`AIGKa&nAEC\NJAE&vKDDAN&eCAE&ICG&E@C_&Kaa&IKG\NKa&NAEC\NJAE&_@OJ@&KNA&NAf\aKGAe&c[&jkB&lMPage mb&KI850
e&ZCofN&_@OJ@
1174
Page 851
Page 851 of 1174
Page 852
Appendix B
NYSDEC Electronic Notice of Intent (eNOI)
Page 852 of 1174
Page 853
Page 853 of 1174
Page 854
0123124573892 !"#"$!!!%&# '&$"32(337)*+7
,-811% -.).!))/+1--101123.13.3139271229.30449451(444!.%61172 7177
Page 854 of 1174
Page 855
0123124573892 !"#"$!!!%&# '&$"32(337)*+7
,-811% -.).!))/+1--101123.13.3139271229.30449451(444!.%61172 2177
Page 855 of 1174
Page 856
0123124573892 !"#"$!!!%&# '&$"32(337)*+7
,-811% -.).!))/+1--101123.13.3139271229.30449451(444!.%61172 6177
Page 856 of 1174
Page 857
0123124573892 !"#"$!!!%&# '&$"32(337)*+7
,-811% -.).!))/+1--101123.13.3139271229.30449451(444!.%61172 9177
Page 857 of 1174
Page 858
0123124573892 !"#"$!!!%&# '&$"32(337)*+7
,-811% -.).!))/+1--101123.13.3139271229.30449451(444!.%61172 (177
Page 858 of 1174
Page 859
0123124573892 !"#"$!!!%&# '&$"32(337)*+7
,-811% -.).!))/+1--101123.13.3139271229.30449451(444!.%61172 4177
Page 859 of 1174
Page 860
0123124573892 !"#"$!!!%&# '&$"32(337)*+7
,-811% -.).!))/+1--101123.13.3139271229.30449451(444!.%61172 0177
Page 860 of 1174
Page 861
0123124573892 !"#"$!!!%&# '&$"32(337)*+7
,-811% -.).!))/+1--101123.13.3139271229.30449451(444!.%61172 5177
Page 861 of 1174
Page 862
0123124573892 !"#"$!!!%&# '&$"32(337)*+7
,-811% -.).!))/+1--101123.13.3139271229.30449451(444!.%61172 4177
Page 862 of 1174
Page 863
0123124573892 !"#"$!!!%&# '&$"32(337)*+7
,-811% -.).!))/+1--101123.13.3139271229.30449451(444!.%61172 Page 863 of 73177
1174
Page 864
0123124573892 !"#"$!!!%&# '&$"32(337)*+7
,-811% -.).!))/+1--101123.13.3139271229.30449451(444!.%61172 Page 864 of 77177
1174
Page 865
Page 865 of 1174
Page 866
Appendix C
MS4 SWPPP Acceptance Form
Page 866 of 1174
Page 867
Page 867 of 1174
Page 868
Page 868 of 1174
Page 869
Page 869 of 1174
Page 870
Appendix D
NYSDEC SPDES General Permit for Stormwater Discharges from Construction
Activity Permit No. GP-0-25-001
Page 870 of 1174
Page 871
Page 871 of 1174
Page 872
Page 872 of 1174
Page 873
PREFACE
Pursuant to Section 402 of the Clean Water Act (CWA), and 40 CFR
122.26(b)(14)(x), (15)(i), and (15)(ii), stormwater discharges from certain construction
activities are unlawful unless they are authorized by a National Pollutant Discharge
Elimination System (NPDES) permit or by a state permit program. New York State
administers the approved State Pollutant Discharge Elimination System (SPDES)
program with permits issued in accordance with the New York State Environmental
Conservation Law (ECL) Article 17, Titles 7 and 8, and Article 70, as well as 6 NYCRR
Parts 621 and 750.
Construction activities constitute construction of a point source and, therefore,
pursuant to ECL sections 17-0505, 17-0701, and 17-0803, the owner or operator must
have coverage under a SPDES permit prior to commencement of construction activities.
The owner or operator cannot wait until there is an actual discharge from the
construction site to obtain permit coverage.
*Note: The italicized words/phrases within this permit are defined in Appendix A.
Page 873 of 1174
Page 874
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
SPDES CONSTRUCTION GENERAL PERMIT (CGP) GP-0-25-001
FOR STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITIES
Table of Contents
Part I. How to Obtain Coverage and General Requirements ..................................... 5
A. Eligibility Requirements ...................................................................................... 5
B. Types of Discharges Authorized ........................................................................ 9
C. Prohibited Discharges ...................................................................................... 10
D. Electronic Notice of Intent (eNOI) Submittal..................................................... 10
E. General Requirements for Owners or Operators with Permit Coverage .......... 14
F. Permit Coverage for Discharges Authorized Under GP-0-20-001.................... 18
G. Change of Owner or Operator.......................................................................... 19
Part II. Water Quality-Based Effluent Limitations ..................................................... 20
A. Maintaining Water Quality ................................................................................ 20
B. Effluent Limitations Applicable to Discharges from Construction Activities ...... 20
C. Post-Construction Stormwater Management Practice (SMP) Requirements ... 23
Part III. Stormwater Pollution Prevention Plan (SWPPP) ......................................... 28
A. General SWPPP Requirements ....................................................................... 28
B. Required SWPPP Contents ............................................................................. 32
C. Required SWPPP Components by Project Type.............................................. 37
Part IV. Inspection and Maintenance Requirements ................................................ 37
A. General Construction Site Inspection and Maintenance Requirements ........... 37
B. Contractor Maintenance Inspection Requirements .......................................... 37
C. Qualified Inspector Inspection Requirements................................................... 38
Part V. How to Terminate CGP Coverage.................................................................. 43
A. Electronic Notice of Termination (eNOT) Submittal.......................................... 43
Part VI. Record Retention and Reporting.................................................................. 45
A. Record Retention ............................................................................................. 46
B. Reporting ......................................................................................................... 46
Part VII. Standard Permit Requirements ................................................................... 46
A. Duty to Comply................................................................................................. 46
B. Need to Halt or Reduce Activity Not a Defense................................................ 46
C. Penalties .......................................................................................................... 46
D. False Statements ............................................................................................. 47
E. Re-Opener Clause ........................................................................................... 47
F. Duty to Mitigate ................................................................................................ 47
G. Requiring Another General Permit or Individual SPDES Permit....................... 47
H. Duty to Provide Information.............................................................................. 49
I. Extension ......................................................................................................... 49
J. Signatories and Certification ............................................................................ 50
K. Inspection and Entry ........................................................................................ 52
L. Confidentiality of Information............................................................................ 53
M. Other Permits May Be Required ...................................................................... 53
Page 874 of 1174
Page 875
N. NYSDEC Orders or Civil Decrees/Judgments.................................................. 53
O. Property Rights ................................................................................................ 53
P. Compliance with Interstate Standards.............................................................. 53
Q. Oil and Hazardous Substance Liability............................................................. 54
R. Severability....................................................................................................... 54
S. NYSDEC Approved Forms............................................................................... 54
APPENDIX A – Abbreviations and Definitions.......................................................... 55
Abbreviations............................................................................................................. 55
Definitions.................................................................................................................. 56
APPENDIX B – Required SWPPP Components by Project Type............................. 64
Table 1....................................................................................................................... 64
Table 2....................................................................................................................... 66
APPENDIX C – Watersheds Requiring Enhanced Phosphorus Removal............... 68
APPENDIX D – Impaired Waterbodies (by Construction Related Pollutants) ........ 74
APPENDIX E – List of NYSDEC Regional Offices..................................................... 80
APPENDIX F – SWPPP Preparer Certification Form ................................................ 81
APPENDIX G – MS4 SWPPP Acceptance Form ........................................................ 83
APPENDIX H – NYCDEP SWPPP Acceptance/Approval Form ................................ 86
APPENDIX I – MS4 No Jurisdiction Form.................................................................. 89
APPENDIX J – Owner/Operator Certification Form .................................................. 91
Page 875 of 1174
Page 876
Part I.
Part I. How to Obtain Coverage and General Requirements
To be covered under this permit, the owner or operator must meet all eligibility
requirements in Part I.A. and follow the requirements for obtaining permit coverage in
Part I.D., F., or G.
A. Eligibility Requirements
For a common plan of development or sale, the phase(s) that meet the eligibility
requirements in Part I.A. may obtain coverage under this permit even if other
phase(s) of the same common plan of development or sale do not meet the
eligibility requirements and require an individual SPDES permit.
1. The owner’s or operator’s construction activities involve soil disturbances of:
a. one or more acres; or
b. less than one acre which are part of a common plan of development or
sale that will ultimately disturb one or more acres; or
c. less than one acre where NYSDEC has determined that a SPDES
permit is required for stormwater discharges based on the potential for
contribution to a violation of a water quality standard or for significant
contribution of pollutants to surface waters of the State.
i. 5,000 square feet or more, but less than one acre, and are in
the New York City Watershed located east of the Hudson River,
Appendix C Figure 1; or
ii. 20,000 square feet or more, but less than one acre, within the
municipal boundaries of the City of New York (NYC); or
iii. less than 20,000 square feet which are part of a common plan
of development or sale that will ultimately disturb 20,000 square
feet or more, but less than one acre, within the municipal
boundaries of NYC; or
iv. that creates 5,000 square feet or more of impervious area within
the municipal boundaries of NYC.
5
Page 876 of 1174
Page 877
Part I.A.2.
2. Discharges from the owner’s or operator’s construction activities are/were not:
a. already covered by a different SPDES permit; or
b. covered under a different SPDES permit that was denied, terminated,
or revoked; or
c. identified in an expired individual SPDES permit that was not renewed;
or
d. required to obtain an individual SPDES permit or another general
SPDES permit in accordance with Part VII.K.
3. If construction activities may adversely affect a species that is endangered or
threatened, the owner or operator must obtain a:
a. permit issued pursuant to 6 NYCRR Part 182 for the project; or
b. letter issued by NYSDEC of non-jurisdiction pursuant to 6 NYCRR Part
182 for the project.
4. If construction activities have the potential to affect an historic property, the
owner or operator must obtain one of the following:
a. documentation that the construction activity is not within an
archeological buffer area indicated on the sensitivity map, and that the
construction activity is not located on or immediately adjacent to a
property listed or determined to be eligible for listing on the National or
State Registers of Historic Places, and that there is no new permanent
building on the construction site within the following distances from a
building, structure, or object that is more than 50 years old, or if there
is such a new permanent building on the construction site within those
parameters that NYS Office of Parks, Recreation and Historic
Preservation (OPRHP), a Historic Preservation Commission of a
Certified Local Government, or a qualified preservation professional
has determined that the building, structure, or object more than 50
years old is not historically/archeologically significant:
i. 1-5 acres of disturbance - 20 feet; or
ii. 5-20 acres of disturbance - 50 feet; or
6
Page 877 of 1174
Page 878
Part I.A.4.a.iii.
iii. 20+ acres of disturbance - 100 feet.
b. NYSDEC consultation form sent to OPRHP, 1 and copied to NYSDEC’s
Agency Historic Preservation Officer (APO), and
i. the State Environmental Quality Review Act (SEQR)
Environmental Assessment Form (EAF) with a negative
declaration or the Findings Statement, with documentation of
OPRHP’s agreement with the resolution; or
ii. documentation from OPRHP that the construction activity will
result in No Impact; or
iii. documentation from OPRHP providing a determination of No
Adverse Impact; or
iv. a Letter of Resolution signed by the owner or operator, OPRHP
and the DEC APO which allows for this construction activity to
be eligible for coverage under the general permit in terms of the
State Historic Preservation Act (SHPA).
c. documentation of satisfactory compliance with Section 106 of the
National Historic Preservation Act for a coterminous project area:
i. No Affect; or
ii. No Adverse Affect; or
iii. Executed Memorandum of Agreement.
d. documentation that SHPA Section 14.09 has been completed by
NYSDEC or another state agency.
5. If construction activities are subject to SEQR, the owner or operator must
obtain documentation that SEQR has been satisfied.
6. If construction activities are not subject to SEQR, but subject to the equivalent
environmental review from another New York State or federal agency, the
1
The consultation form can be submitted, along with other project information, through
OPRHP's Cultural Resource Information System (CRIS) portal. If submitted through CRIS,
paper copies of the consultation form need not be mailed.
7
Page 878 of 1174
Page 879
Part I.A.6.
owner or operator must obtain documentation that project review, pursuant to
a process equivalent to SEQR from another New York State or federal
agency, has been satisfied.
7. If construction activities require Uniform Procedures Act (UPA) Permits (see 6
NYCRR Part 621) from NYSDEC, or the equivalent from another New York
State or federal agency, the owner or operator must:
a. obtain all such necessary permits; or
b. receive notification from NYSDEC pursuant to 6 NYCRR 621.3(a)(4)
excepting Part I.A.7.a.
8. Construction activities are not eligible if they meet the following criteria in Part
I.A.8.a. or b.:
a. For linear transportation and linear utility project types, the construction
activities:
i. are within the watershed of surface waters of the State
classified as AA or AA-S identified utilizing the Stormwater
Interactive Map on NYSDEC’s website; and
ii. are undertaken on land with no existing impervious cover; and
iii. disturb two or more acres of steep slope.
b. For all other project types, the construction activities:
i. are within the watershed of surface waters of the State
classified as AA or AA-S identified utilizing the Stormwater
Interactive Map on NYSDEC’s website; and
ii. are undertaken on land with no existing impervious cover; and
iii. disturb one or more acres of steep slope.
8
Page 879 of 1174
Page 880
Part I.B.
B. Types of Discharges Authorized
1. The following stormwater discharges are authorized under this permit:
a. Stormwater discharges, including stormwater runoff, snowmelt runoff, and
surface runoff and drainage, associated with construction activity, are
authorized under this permit provided that appropriate stormwater controls
are designed, installed, and maintained in accordance with Part II. and
Part III.
b. Stormwater discharges from construction support activities at the
construction site (including concrete or asphalt batch plants, equipment
staging yards, material storage areas, excavated material disposal areas,
and borrow areas) if the following requirements are met:
i. The support activity is directly related to the construction site
required to have permit coverage for stormwater discharges; and
ii. The support activity is not a commercial operation, nor does it serve
multiple unrelated construction sites; and
iii. The support activity does not continue to operate beyond the
completion of the construction activity at the site it supports; and
iv. Stormwater controls are implemented in accordance with Part II.
and Part III. for discharges from the support activity areas.
2. The following non-stormwater discharges associated with construction activity
are authorized under this permit:
a. Non-stormwater discharges listed in 6 NYCRR 750-1.2(a)(29)(vi), with the
following exception: “Discharges from firefighting activities are authorized
only when the firefighting activities are emergencies/unplanned”; and
b. Non-stormwater discharges of waters to which other components have not
been added that are used in accordance with the SWPPP to control dust
or irrigate vegetation in stabilized areas; and
c. Uncontaminated discharges from dewatering operations
9
Page 880 of 1174
Page 881
Part I.B.3.
3. Authorized discharges of stormwater or authorized discharges of non-
stormwater, commingled with a discharge authorized by a different SPDES
permit and/or a discharge that does not require SPDES permit authorization,
are also authorized under this permit.
C. Prohibited Discharges
1. Non-stormwater discharges prohibited under this permit include but are not
limited to:
a. Wastewater from washout of concrete; and
b. Wastewater from washout and cleanout of stucco, paint, form release
oils, curing compounds, and other construction materials; and
c. Fuels, oils, or other pollutants used in vehicle and equipment operation
and maintenance; and
d. Soaps, solvents, or detergents used in vehicle and equipment washing
or external building washdown; and
e. Toxic or hazardous substances from a spill or other release.
D. Electronic Notice of Intent (eNOI) Submittal
To receive authorization in accordance with Part I.D.3.b., the owner or operator
must submit a complete eNOI in accordance with the requirements in Part I.D.
The eNOI contains questions to: ensure eligibility requirements in Part I.A. have
been met; obtain owner or operator contact information; obtain the total area to
be disturbed and the existing/future impervious areas (rounded to the nearest
tenth of an acre); confirm Traditional Land Use Control MS4 Operator jurisdiction
over construction projects; satisfy the EPA eRule requirements; confirm that the
Water Quality-Based Effluent Limitations in Part II. have been met; demonstrate
consideration of the future risks due to climate change in accordance with Part
III.A.2.; and confirm that the other Stormwater Pollution Prevention Plan
(SWPPP) requirements in Part III. have been met.
1. An eNOI may be submitted for:
a. construction activities that are not part of a common plan of
development or sale; or
10
Page 881 of 1174
Page 882
Part I.D.1.b.
b. an entire common plan of development or sale; or
c. separate phase(s) of a common plan of development or sale if the
following requirements are met:
i. the common plan of development or sale meets the eligibility
requirements of Part I.A.5. or 6.; and
ii. the phase(s) meet(s) all other eligibility requirements of Part
I.A.; and
iii. Part III.C. Required SWPPP Components by Project Type is
based on the common plan of development or sale, not the
phase(s); or
d. tree clearing that is associated with, or will support, a renewable
energy generation, transmission, or storage project that meets Part
I.A.5. and 6., if the tree clearing:
i. meets all other eligibility requirements of Part I.A.; and
ii. will occur in NYSDEC’s Regions 3-9; and
iii. is not within ¼ mile of a bat hibernaculum protected pursuant to
6 NYCRR Part 182; and
iv. will occur between November 1st and March 31st.
2. As prerequisites for submitting an eNOI, the owner or operator must:
a. prepare a SWPPP for Part I.D.1.a., b., c., or d. in accordance with Part
III.; and
b. based on the following criteria, upload the following signature forms
signed in accordance with Part VII.J. to the eNOI prior to submission:
i. for all eNOIs:
1. the SWPPP Preparer Certification Form, Appendix F,
signed by the SWPPP preparer; and
11
Page 882 of 1174
Page 883
Part I.D.2.b.i.2.
2. the Owner/Operator Certification Form, Appendix J,
signed by the owner or operator; and
ii. if an eNOI includes construction activities within the municipal
boundary(ies) of Traditional Land Use Control MS4 Operator(s)
that will discharge to the MS4(s):
1. determine if the Traditional Land Use Control MS4
Operator(s) have review authority. A Traditional Land
Use Control MS4 Operator does not have review
authority where:
a. the owner or operator of the construction activities
in Part I.D.2.b.ii. is the same entity as the
Traditional Land Use Control MS4 Operator
identified in Part I.D.2.b.ii.; or
b. there is a statute exempting the owner or operator
from zoning review by the Traditional Land Use
Control MS4 Operator; or
c. there is no such statute per Part I.D.2.b.ii.1.b., the
Traditional Land Use Control MS4 Operator
concludes, after public hearing, that it does not
have zoning review authority in accordance with
Legal Memorandum LU14 Updated January 2020
“Governmental Immunity from Zoning and Other
Legislation”; and
2. if the Traditional Land Use Control MS4 Operator(s) have
review authority, submit the SWPPP to the Traditional
Land Use Control MS4 Operator(s) for review and have:
a. if outside the municipal boundaries of NYC: the
MS4 SWPPP Acceptance Form, Appendix G,
signed by the principal executive officer or ranking
elected official from the Traditional Land Use
Control MS4 Operator, or by a duly authorized
representative of that person in accordance with
Part VII.J.2.; or
12
Page 883 of 1174
Page 884
Part I.D.2.b.ii.2.b.
b. if within the municipal boundaries of NYC: The
City of New York Department of Environmental
Protection (NYCDEP) SWPPP
Acceptance/Approval Form, Appendix H, signed
by the principal executive officer or ranking elected
official from the Traditional Land Use Control MS4
Operator, or by a duly authorized representative of
that person in accordance with Part VII.J.2.; and
3. if the Traditional Land Use Control MS4 Operator does
not have review authority, have the MS4 No Jurisdiction
Form, Appendix I, signed by the principal executive
officer or ranking elected official from the Traditional Land
Use Control MS4 Operator, or by a duly authorized
representative of that person in accordance with Part
VII.J.2.
3. Submitting an eNOI:
a. The owner or operator must submit a complete Notice of Intent
electronically using a NYSDEC approved form. 2
b. The owner or operator is authorized to commence construction activity
as of the authorization date indicated in the Letter of Authorization
(LOA), which is sent by NYSDEC after a complete eNOI is submitted.
i. If an eNOI is received for a SWPPP that deviates from one of
the technical standards but demonstrates equivalence in
accordance with Part III.B.1.a.ii. or Part III.B.2.b.ii., if the
SWPPP includes construction activities that are not within the
municipal boundary(ies) of Traditional Land Use Control MS4
Operator(s), and/or if the SWPPP includes construction
activities within the municipal boundary(ies) of Traditional Land
Use Control MS4 Operator(s) that do not have review authority
in accordance with Part I.D.2.b.ii.1., the authorization date
indicated in the LOA will be 60 business days after the eNOI
submission date.
2 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or (d). All waiver requests must
be submitted to [email protected] or NYSDEC, Bureau of Water Permits, 625 Broadway, 4th
Floor, Albany, New York 12233-3505.
13
Page 884 of 1174
Page 885
Part I.D.3.c.
c. If Traditional Land Use Control MS4 Operator(s) have review authority
in accordance with Part I.D.2.b.ii.2., the owner or operator must, within
five business days of receipt of the LOA, send an electronic copy of the
LOA to the Traditional Land Use Control MS4 Operator(s) with review
authority.
E. General Requirements for Owners or Operators with Permit Coverage
1. As of the date the LOA is received, the owner or operator must make the
eNOI, SWPPP, and LOA available for review and copying in accordance with
the requirements in Part VII.H. When applicable, as of the date an updated
LOA is received, the owner or operator must make the updated LOA available
for review and copying in accordance with the requirements in Part VII.H.
2. The owner or operator must ensure compliance with all requirements of this
permit and that the provisions of the SWPPP, including any changes made to
the SWPPP in accordance with Part III.A.5., are properly implemented and
maintained from the commencement of construction activity until:
a. all areas of disturbance have achieved final stabilization; and
b. the owner’s or operator’s coverage under this permit is terminated in
accordance with Part V.A.5.a.
3. As of the date of the commencement of construction activities until Part
I.E.2.a. and b. have been met, the owner or operator must maintain at the
construction site, a copy of:
a. all documentation necessary to demonstrate eligibility with this permit; and
b. this permit; and
c. the SWPPP; and
d. the signed SWPPP Preparer Certification Form; and
e. the signed MS4 SWPPP Acceptance Form or signed NYCDEP SWPPP
Acceptance/Approval Form or signed MS4 No Jurisdiction Form (when
applicable); and
f. the signed Owner/Operator Certification Form; and
14
Page 885 of 1174
Page 886
Part I.E.3.g.
g. the eNOI; and
h. the LOA; and
i. the LOA transmittal to the Traditional Land Use Control MS4 Operator in
accordance with Part I.D.3.c. (when applicable).
4. The owner or operator must maintain at the construction site, until Part
I.E.2.a. and b. have been met, as of the date the documents become final or
are received, a copy of the:
a. responsible contractor’s or subcontractor’s certification statement(s) in
accordance with Part III.A.7.; and
b. inspection reports in accordance with Part IV.C.4. and 6.; and
c. Request to Disturb Greater Than Five Acres and the Authorization Letter
to Disturb Greater Than Five Acres in accordance with Part I.E.6. (when
applicable); and
d. Request to Continue Coverage and the Letter of Continued Coverage
(LOCC) in accordance with Part I.F.2. and 4. (when applicable); and
e. The updated LOA(s) in accordance with Part I.E.9. (when applicable).
5. The owner or operator must maintain the documents in Part I.E.3. and 4. in a
secure location, such as a job trailer, on-site construction office, or mailbox
with lock. The secure location must be accessible during normal business
hours to an individual performing a compliance inspection. The documents
must be paper documents unless electronic documents are accessible to the
inspector during an inspection to the same extent as a paper copy stored at
the site would be. If electronic documents are kept on site, the owner or
operator must maintain functional equipment on site available to an inspector
during normal hours of operation such that an inspector may view the
electronic documents in a format that can be read in a similar manner as a
paper record and in a legally dependable format with no less evidentiary
value than their paper equivalent.
6. The owner or operator must meet the following requirements prior to
disturbing greater than five acres of soil at any one time:
a. The owner or operator must submit a written Request to Disturb Greater
Than Five Acres to:
15
Page 886 of 1174
Page 887
Part I.E.6.a.i.
i. NYSDEC’s Regional Office Division of Water staff based on the
project location, Appendix E, if a Traditional Land Use Control MS4
Operator does not have review authority in accordance with Part
I.D.2.b.ii.1.; or
ii. the Traditional Land Use Control MS4 Operator, if a Traditional
Land Use Control MS4 Operator has review authority in
accordance with Part I.D.2.b.ii.1.; or
iii. NYSDEC’s Regional Office Division of Water staff based on the
project location, Appendix E, and each involved Traditional Land
Use Control MS4 Operator, if the project spans multiple
municipalities with more than one Traditional Land Use Control
MS4 Operator involved with review authority in accordance with
Part I.D.2.b.ii.1.
b. The written Request to Disturb Greater Than Five Acres must include:
i. The SPDES permit identification number (Permit ID); and
ii. Full technical justification demonstrating why alternative methods of
construction that would result in five acres of soil disturbance or
less at any one time are not feasible; and
iii. The phasing plan for the project and sequencing plans for all
phases from the SWPPP in accordance with Part III.B.1.d.; and
iv. Plans with locations and details of erosion and sediment control
practices such that the heightened concern for erosion when
disturbing greater than five acres at one time has been addressed;
and
v. Acknowledgment that “the owner or operator will comply with the
requirements in Part IV.C.2.b.”; and
vi. Acknowledgment that “the owner or operator will comply with the
requirements in Part II.B.1.b.”
c. The owner or operator must be in receipt of an Authorization Letter to
Disturb Greater Than Five Acres, which will include when the
16
Page 887 of 1174
Page 888
Part I.E.6.c.
authorization begins and ends and indicate a maximum area (acres) of
soil disturbance allowed at any one time, from:
i. NYSDEC, if Part I.E.6.a.i. or iii. apply; or
ii. the Traditional Land Use Control MS4 Operator, if Part I.E.6.a.ii.
applies.
7. Upon a finding of significant non-compliance with the practices described in
the SWPPP or violation of this permit, NYSDEC may order an immediate stop
to all construction activity at the site until the non-compliance is remedied.
The stop work order must be in writing, describe the non-compliance in detail,
and be sent to the owner or operator.
8. If any human remains or archaeological remains are encountered during
excavation, the owner or operator must immediately cease, or cause to
cease, all construction activity in the area of the remains and notify the
appropriate Regional Water Engineer (RWE). 3 Construction activity shall not
resume until written permission to do so has been received from the RWE.
9. To be authorized to implement modifications to the information previously
submitted in the eNOI, the owner or operator must:
a. notify NYSDEC via email at [email protected] requesting
access to update the eNOI; and
b. update the eNOI to reflect the modifications and resubmit the eNOI in
accordance with Part I.D.; and
c. receive an updated LOA.
10. The eNOI, SWPPP, LOA, updated LOAs (when applicable), and inspection
reports required by this permit are public documents that the owner or
operator must make available for review and copying by any person within
five business days of the owner or operator receiving a written request by any
such person to review these documents. Copying of documents will be done
at the requester’s expense.
3 The Regional Water Manager where a DEC Region does not have a RWE.
17
Page 888 of 1174
Page 889
Part I.F.
F. Permit Coverage for Discharges Authorized Under GP-0-20-001
When applicable:
1. Upon the effective date of this permit, an owner or operator of a construction
activity, with coverage under GP-0-20-001, will have interim coverage under
GP-0-25-001 for 45 calendar days starting on the effective date of GP-0-25-
001 so long as the owner or operator maintains compliance with all applicable
requirements of this permit.
2. Within 30 calendar days of the effective date of this permit, the owner or
operator, with coverage under GP-0-20-001, must submit a complete Request
to Continue Coverage electronically using a NYSDEC approved form, 4 which
contains the information identified in Part I.F.3. below, if:
a. the owner or operator continues to implement the SMP component in
conformance with the technical standards in place at the time of initial
project authorization; and
b. the owner or operator will comply with all non-design requirements of GP-
0-25-001.
3. The Request to Continue Coverage form contains questions to: ensure
eligibility requirements in Part I.A. have been met; verify owner or operator
contact information; verify the permit identification number; verify the original
eNOI submission ID, if applicable; verify Part I.F.2.a. and b.; verify the version
of the Design Manual that the technical/design components conform to; and
receive an updated Owner/Operator Certification Form, Appendix I.
4. The owner or operator has obtained continued coverage under GP-0-25-001
as of the date indicated in the LOCC, which is sent by NYSDEC after a
complete Request to Continue Coverage form is submitted.
5. If the owner or operator does not submit the Request to Continue Coverage
form in accordance with Part I.F.2. and 3., coverage under this permit is
automatically terminated after interim coverage expires.
4 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or (d). All waiver requests must
be submitted to [email protected] or NYSDEC, Bureau of Water Permits, 625 Broadway, 4th
Floor, Albany, New York 12233-3505.
18
Page 889 of 1174
Page 890
Part I.G.
G. Change of Owner or Operator
When applicable:
1. When property ownership changes, or when there is a change in operational
control over the construction plans and specifications, the following process
applies:
a. The new owner or operator must meet the applicable prerequisites for
submitting an eNOI in accordance with Part I.D.2.; and
b. The new owner or operator must submit an eNOI in accordance with Part
I.D.3.; and
c. Permit coverage for the new owner or operator will be effective upon
receipt of the LOA in accordance with Part I.D.3.b.; and
d. The new owner or operator, upon receipt of their LOA, must provide their
Permit ID to the original owner or operator; and
e. If the original owner or operator will no longer be the owner or operator of
the construction activity identified in the original owner’s or operator’s
eNOI, the original owner or operator, upon receipt of the new owner’s or
operator’s Permit ID in accordance with Part I.G.1.d., must submit to
NYSDEC a completed eNOT in accordance with Part V. that includes the
name and Permit ID of the new owner or operator; or
f. If the original owner or operator maintains ownership of a portion of the
construction activity, the original owner or operator must maintain their
coverage under the permit by modifying their eNOI; modifications to the
eNOI must include:
i. the revised area of disturbance and/or impervious area(s); and
ii. the revised SMP information, if applicable; and
iii. a narrative description of what has changed; and
iv. the new owner’s or operator’s Permit ID for the portion of the
project removed from the eNOI.
Owners or operators must follow Part I.E.9. to modify the eNOI.
19
Page 890 of 1174
Page 891
Part II.
Part II. Water Quality-Based Effluent Limitations
A. Maintaining Water Quality
NYSDEC expects that compliance with the requirements of this permit will control
discharges necessary to meet applicable water quality standards. It shall be a
violation of the ECL for any discharge to either cause or contribute to a violation
of the following water quality standards as contained in Parts 700 through 705 of
Title 6 of the Official Compilation of Codes, Rules and Regulations of the State of
New York:
1. There must be no increase in turbidity that will cause a substantial visible
contrast to natural conditions; and
2. There must be no increase in suspended, colloidal or settleable solids that will
cause deposition or impair the waters for their best usages; and
3. There must be no residue from oil and floating substances, nor visible oil film,
nor globules of grease.
If there is evidence indicating that the stormwater discharges authorized by this
permit are causing, have the reasonable potential to cause, or are contributing to
a violation of the water quality standard, the owner or operator must take
appropriate corrective action in accordance with Part IV.C.5. of this permit and
document in accordance with Part IV.C.4. of this permit. To address the water
quality standard violation the owner or operator must include and implement
appropriate controls in the SWPPP to correct the problem or obtain an individual
SPDES permit.
If, despite compliance with the requirements of this permit, it is demonstrated that
the stormwater discharges authorized by this permit are causing or contributing
to a violation of water quality standards, or if NYSDEC determines that a
modification of this permit is necessary to prevent a violation of water quality
standards, the authorized discharges will no longer be eligible for coverage under
this permit, and the owner or operator must obtain an individual SPDES permit
prior to further discharges from the construction site.
B. Effluent Limitations Applicable to Discharges from Construction Activities
Discharges authorized by this permit must achieve, at a minimum, the effluent
limitations in Part II.B.1.a., b., c., d., and e. These limitations represent the
20
Page 891 of 1174
Page 892
Part II.B.
degree of effluent reduction attainable by the application of best practicable
technology currently available.
1. Erosion and Sediment Control Requirements - The owner or operator must
select, design, install, implement, and maintain control measures to minimize
the discharge of pollutants and prevent a violation of the water quality
standards. The selection, design, installation, implementation, and
maintenance of these control measures must meet the non-numeric effluent
limitations in Part II.B.1.a., b., c., d., and e. and be in accordance with the
New York State Standards and Specifications for Erosion and Sediment
Control (BB), dated November 2016, using sound engineering judgment.
Where control measures are not designed in conformance with the design
criteria included in the technical standard, the owner or operator must include
in SWPPP the reason(s) for the deviation, or alternative design, and provide
information in the SWPPP demonstrating that the deviation or alternative
design is equivalent to the technical standard.
a. Erosion and Sediment Controls. At a minimum, erosion and sediment
controls must be selected, designed, installed, implemented, and
maintained to:
i. Minimize soil erosion through application of runoff control and soil
stabilization control measure to minimize pollutant discharges; and
ii. Control stormwater discharges, including both peak flow rates and
total stormwater volume, to minimize channel and streambank
erosion and scour in the immediate vicinity of the discharge points;
and
iii. Minimize the amount of soil exposed during construction activity;
and
iv. Minimize the disturbance of steep slope; and
v. Minimize sediment discharges from the site; and
vi. Provide and maintain natural buffers around surface waters, direct
stormwater to vegetated areas and maximize stormwater infiltration
to reduce pollutant discharges, unless infeasible; and
vii. Minimize soil compaction. Minimizing soil compaction is not required
21
Page 892 of 1174
Page 893
Part II.B.1.a.vii.
where the intended function of a specific area of the site dictates that
it be compacted; and
viii. Unless infeasible, preserve a sufficient amount of topsoil to complete
soil restoration and establish a uniform, dense vegetative cover; and
ix. Minimize dust. On areas of exposed soil, minimize dust through the
appropriate application of water or other dust suppression techniques
to control the generation of pollutants that could be discharged from
the site.
b. Soil Stabilization. In areas where soil disturbance activity has ceased,
whether permanently or temporarily ceased, the application of soil
stabilization measures must be initiated by the end of the next business
day and completed within 14 calendar days from the date the current soil
disturbance activity ceased. For construction sites that directly discharge
to one of the 303(d) segments listed in Appendix D, or are located in one
of the watersheds listed in Appendix C, or are authorized to disturb greater
than five acres in accordance with Part I.E.5.a.viii., the application of soil
stabilization measures must be initiated by the end of the next business
day and completed within seven calendar days from the date the soil
disturbance activity ceased.
c. Dewatering. Discharges from dewatering activities, including discharges
from dewatering of trenches and excavations, must be managed by
appropriate control measures.
d. Pollution Prevention Measures. Select, design, install, implement, and
maintain effective pollution prevention measures to minimize the
discharge of pollutants and prevent a violation of the water quality
standards. At a minimum, such measures must be selected, designed,
installed, implemented, and maintained to:
i. Minimize the discharge of pollutants from equipment and vehicle
washing, wheel wash water, and other wash waters. Soaps,
detergents and solvents cannot be used; and
ii. Minimize the exposure of building materials, building products,
construction wastes, trash, landscape materials, fertilizers,
pesticides, herbicides, detergents, sanitary waste, hazardous and
toxic waste, and other materials present on the site to precipitation
22
Page 893 of 1174
Page 894
Part II.B.1.d.ii.
and to stormwater. Minimization of exposure is not required in
cases where the exposure to precipitation and to stormwater will
not result in a discharge of pollutants, or where exposure of a
specific material or product poses little risk of stormwater
contamination (such as final products and materials intended for
outdoor use); and
iii. Prevent the discharge of pollutants from spills and leaks and
implement chemical spill and leak prevention and response
procedures.
e. Surface Outlets. When discharging from basins and impoundments, the
surface outlets must be designed, constructed, and maintained in such a
manner that sediment does not leave the basin or impoundment and that
erosion at or below the outlet does not occur.
C. Post-Construction Stormwater Management Practice (SMP) Requirements
1. The owner or operator of a construction activity that requires post-
construction SMPs, in accordance with Part III.C., must select, design, install,
implement, and maintain the SMPs to meet the performance criteria in the
New York State Stormwater Management Design Manual, dated July 31,
2024 (DM), using sound engineering judgment. Where SMPs are not
designed in conformance with the performance criteria in the DM, the owner
or operator must include in the SWPPP the reason(s) for the deviation or
alternative design and provide information which demonstrates that the
deviation or alternative design is equivalent to the technical standard.
2. The owner or operator of a construction activity, that requires SMPs in
accordance with Part III.C., must design the practices to meet the applicable
sizing criteria in Part II.C.2.a., b., c., or d.
a. Sizing Criteria for New Development
i. Runoff Reduction Volume (RRv) and Water Quality Volume (WQv):
1. Reduce the total WQv by application of RR techniques and
standard SMPs with RRv capacity. The total WQv must be
calculated in accordance with the criteria in Section 4.2 of
the DM; or
23
Page 894 of 1174
Page 895
Part II.C.2.a.i.2.
2. Minimum RRv and Treatment of Remaining Total WQv:
Construction activities that cannot meet the requirements in
Part II.C.2.a.i.1. due to site limitations must direct runoff from
all newly constructed impervious areas to a RR technique or
standard SMP with RRv capacity unless infeasible. The
specific site limitations that prevent the reduction of 100% of
the WQv must be documented in the SWPPP. For each
impervious area that is not directed to a RR technique or
standard SMP with RRv capacity, the SWPPP must include
documentation which demonstrates that all options were
considered and for each option explains why it is considered
infeasible.
In no case shall the runoff reduction achieved from the
newly constructed impervious areas be less than the
Minimum RRv as calculated using the criteria in Section
4.4 of the DM. The remaining portion of the total WQv that
cannot be reduced must be treated by application of
standard SMPs.
ii. Channel Protection Volume (CPv): Provide 24 hour extended
detention of the post-developed 1-year, 24-hour storm event,
remaining after runoff reduction. Where a CPv control orifice is
provided, the minimum orifice size must be 3 inches, with
acceptable external trash rack or orifice protection. The CPv
requirement does not apply when:
1. Reduction of the entire CPv is achieved by application of
runoff reduction techniques or infiltration systems; or
2. The 1-year post-development peak discharge is less than or
equal to 2.0 cfs without detention or velocity controls; or
3. The site directly discharges into a fifth order or larger water
body (stream, river, or lake), or tidal waters, where the
increase in smaller flows will not impact the stream bank or
channel integrity. However, the point of discharge must be
adequately protected against scour and erosion by the
increased peak discharge.
24
Page 895 of 1174
Page 896
Part II.C.2.a.iii.
iii. Overbank Flood Control Criteria (Qp): Requires storage to
attenuate the post-development 10-year, 24-hour peak discharge
rate (Qp) to predevelopment rates. The Qp requirement does not
apply when:
1. the site directly discharges to tidal waters or fifth order or
larger streams, or
2. A downstream analysis reveals that overbank control is not
required.
iv. Extreme Flood Control Criteria (Qf): Requires storage to attenuate
the post-development 100-year, 24-hour peak discharge rate (Qf)
to predevelopment rates. The Qf requirement does not apply when:
1. the site directly discharges to tidal waters or fifth order or
larger streams, or
2. A downstream analysis reveals that overbank control is not
required.
b. Sizing Criteria for New Development in Enhanced Phosphorus
Removal Watersheds
i. Runoff Reduction Volume (RRv) and Water Quality Volume (WQv):
1. Reduce the WQv by application of RR techniques and
standard SMPs with RRv capacity. The total WQv is the
runoff volume from the 1-year, 24-hour design storm over
the post-developed watershed and must be calculated in
accordance with the criteria in Section 4.3 of the DM; or
2. Minimum RRv and Treatment of Remaining Total WQv:
Construction activities that cannot meet the criteria in Part
II.C.2.b.i.1. due to site limitations must direct runoff from all
newly constructed impervious areas to a RR technique or
standard SMP with RRv capacity unless infeasible. The
specific site limitations that prevent the reduction of 100% of
the WQv must be documented in the SWPPP. For each
impervious area that is not directed to a RR technique or
standard SMP with RRv capacity, the SWPPP must include
25
Page 896 of 1174
Page 897
Part II.C.2.b.i.2.
documentation which demonstrates that all options were
considered and for each option explains why it is considered
infeasible.
In no case shall the runoff reduction achieved from the
newly constructed impervious areas be less than the
Minimum RRv as calculated using the criteria in Section
4.5 of the DM. The remaining portion of the total WQv that
cannot be reduced must be treated by application of
standard SMPs.
ii. Channel Protection Volume (CPv): Provide 24 hour extended
detention of the post-developed 1-year, 24-hour storm event,
remaining after runoff reduction. Where a CPv control orifice is
provided, the minimum orifice size must be 3 inches, with
acceptable external trash rack or orifice protection. The CPv
requirement does not apply when:
1. Reduction of the entire CPv is achieved by application of
runoff reduction techniques or infiltration systems; or
2. The 1-year post-development peak discharge is less than or
equal to 2.0 cfs; or
3. The site directly discharges to tidal waters, or a fifth order or
larger water body (stream, river, or lake) where the increase
in smaller flows will not impact the stream bank or channel
integrity. However, the point of discharge must be
adequately protected against scour and erosion by the
increased peak discharge.
iii. Overbank Flood Control Criteria (Qp): Requires storage to
attenuate the post-development 10-year, 24-hour peak discharge
rate (Qp) to predevelopment rates. The Qp requirement does not
apply when:
1. the site directly discharges to tidal waters or fifth order or
larger streams; or
2. A downstream analysis reveals that overbank control is not
required.
26
Page 897 of 1174
Page 898
Part II.C.2.b.iv.
iv. Extreme Flood Control Criteria (Qf): Requires storage to attenuate
the post-development 100-year, 24-hour peak discharge rate (Qf)
to predevelopment rates. The Qf requirement does not apply when:
1. the site directly discharges to tidal waters or fifth order or
larger streams; or
2. A downstream analysis reveals that overbank control is not
required.
c. Sizing Criteria for Redevelopment Activity
i. Water Quality Volume (WQv): The WQv treatment objective for
redevelopment activity must be addressed by one of the following
options, as outlined in Section 9.2.1. Redevelopment activities
located in an Enhanced Phosphorus Removal Watershed (see Part
III.B.3. and Appendix C) must calculate the WQv in accordance
with Section 4.3 of the DM. All other redevelopment activities must
calculate the WQv in accordance with Section 4.2 of the DM.
1. Reduce the existing impervious cover by a minimum of 25%
of the total disturbed, impervious area. The Soil Restoration
criteria in Section 5.1.6 of the DM must be applied to all
newly created pervious areas; or
2. Capture and treat 100% of the required WQv, for a minimum
of 25% of the disturbed redevelopment impervious area, by
implementation of standard SMPs or reduced by application
of runoff reduction techniques; or
3. Capture and treat 100% of the required WQv, for a minimum
of 75% of the disturbed redevelopment impervious area, by
implementation of a volume-based alternative SMP, as
defined in Section 9.4 of the DM; or
4. Capture and treat 100% of the required WQv, for a minimum
of 75% of the disturbed redevelopment impervious area, by
implementation of a flow-through alternative SMP sized to
treat the peak rate of runoff from the WQv design storm; or
27
Page 898 of 1174
Page 899
Part II.C.2.c.i.5.
5. Application of a combination of 1 through 4 above that
provide a weighted average of at least two of the above
methods. Application of this method must be in accordance
with the criteria in Section 9.2.1(A)(V) of the DM; or
6. If there is an existing SMP located on the site that captures
and treats runoff from the impervious area that is being
disturbed, the WQv treatment option selected must, at a
minimum, provide treatment equal to the treatment that was
being provided by the existing practice(s) if that treatment is
greater than the treatment required by options 1 through 5
above.
ii. Channel Protection Volume (CPv) is not required if there is 0%
change to hydrology that increases the discharge rate and volume
from the project site.
iii. Overbank Flood Control (Qp) is not required if there is 0% change
to hydrology that increases the discharge rate from the project site.
iv. Extreme Flood Control (Qf) is not required if there is 0% change to
hydrology that increases the discharge rate from the project site.
d. Sizing Criteria for Combination of Redevelopment Activity and New
Development
Construction projects, that include both new development and redevelopment
activity, must use SMPs that meet the sizing criteria calculated as an
aggregate of the sizing criteria in Part II.C.2.a. or b. for the new development
portion of the project and Part II.C.2.c. for the redevelopment activity portion
of the project.
Part III. Stormwater Pollution Prevention Plan (SWPPP)
A. General SWPPP Requirements
1. A SWPPP must be prepared and implemented by the owner or operator of all
construction activity covered by this permit. All authorized discharges must be
identified in the SWPPP. The SWPPP must document the selection, design,
installation, implementation and maintenance of the control measures and
28
Page 899 of 1174
Page 900
Part III.A.1.
practices that will be used to meet the effluent limitations in Part II.B. and,
where applicable, the SMP requirements in Part II.C.
2. The SWPPP must demonstrate consideration in narrative format of the future
physical risks due to climate change pursuant to the Community Risk and
Resiliency Act (CRRA), 6 NYCRR Part 490, and associated guidance.
a. The owner or operator must consider:
i. the following physical risks due to climate change:
(i) increasing temperature; and
(ii) increasing precipitation; and
(iii) increasing variability in precipitation, including chance of
drought; and
(iv) increasing frequency and severity of flooding; and
(v) rising sea level; and
(vi) increasing storm surge; and
(vii) shifting ecology.
ii. for each of the following:
(i) overall site planning; and
(ii) location, elevation, and sizing of:
a. control measures and practices; and
b. conveyance system(s); and
c. detention system(s).
3. The SWPPP must describe the erosion and sediment control practices and
where required, SMPs that will be used and/or constructed to reduce the
pollutants in stormwater discharges and to assure compliance with the
29
Page 900 of 1174
Page 901
Part III.A.3.
requirements of this permit. In addition, the SWPPP must identify potential
sources of pollution which may reasonably be expected to affect the quality of
stormwater discharges.
4. All SWPPPs, that require the SMP component in accordance with Part
III.B.2., must be prepared by a qualified professional.
5. The owner or operator must keep the SWPPP current so that, at all times, it
accurately documents the erosion and sediment control practices that are
being used or will be used during construction, and all SMPs that will be
constructed on the site. At a minimum, the owner or operator must modify the
SWPPP, including construction drawings:
a. whenever the current provisions prove to be ineffective in minimizing
pollutants in stormwater discharges from the site; and
b. whenever there is a change in design, construction, or operation at the
construction site that has or could have an effect on the discharge of
pollutants; and
c. to address issues or deficiencies identified during an inspection by the
qualified inspector, NYSDEC, or other regulatory authority; and
d. to document the final construction conditions in an as-built drawing.
6. NYSDEC may notify the owner or operator at any time that the SWPPP does
not meet one or more of the minimum requirements of this permit. The
notification must be in writing and identify the provisions of the SWPPP that
require modification. Within fourteen (14) calendar days of such notification,
or as otherwise indicated by NYSDEC, the owner or operator must make the
required changes to the SWPPP and submit written notification to NYSDEC
that the changes have been made. If the owner or operator does not respond
to NYSDEC’s comments in the specified time frame, NYSDEC may suspend
the owner’s or operator’s coverage under this permit or require the owner or
operator to obtain coverage under an individual SPDES permit in accordance
with Part II.D.4.
7. Prior to the commencement of construction activity, the owner or operator
must identify the contractor(s) and subcontractor(s) that will be responsible for
installing, constructing, repairing, replacing, inspecting, and maintaining the
erosion and sediment control practices included in the SWPPP and the
30
Page 901 of 1174
Page 902
Part III.A.7.
contractor(s) and subcontractor(s) that will be responsible for constructing the
SMPs included in the SWPPP. The owner or operator must have each of the
contractors and subcontractors identify at least one person from their
company to be trained contractor that will be responsible for implementation
of the SWPPP. The owner or operator must ensure that at least one trained
contractor is on site daily when soil disturbance activities are being
performed.
The owner or operator must have each of the contractors and subcontractors
identified above sign a copy of the following certification statement below
before the commencement of construction activities:
"I hereby certify under penalty of law that I understand and agree to
comply with the requirements of the SWPPP and agree to implement any
corrective actions identified by the qualified inspector during a site
inspection. I also understand that the owner or operator must comply with
the requirements of the most current version of the New York State
Pollutant Discharge Elimination System (SPDES) Construction General
Permit (CGP) for Stormwater Discharges from Construction Activities and
that it is unlawful for any person to cause or contribute to a violation of
water quality standards. Furthermore, I am aware that there are significant
penalties for submitting false information, that I do not believe to be true,
including the possibility of fine and imprisonment for knowing violations"
In addition to providing the certification statement above, the certification
page must also identify the specific elements of the SWPPP that each
contractor and subcontractor will be responsible for and include the name and
title of the person providing the signature; the name and title of the trained
contractor responsible for SWPPP implementation; the name, address and
telephone number of the contracting firm; the address (or other identifying
description) of the site; and the date the certification statement is signed. The
owner or operator must attach the certification statement(s) to the copy of the
SWPPP that is maintained at the construction site. If new or additional
contractors are hired to implement measures identified in the SWPPP after
the commencement of construction activities, they must also sign the
certification statement and provide the information listed above prior to
performing construction activities.
31
Page 902 of 1174
Page 903
Part III.B.
B. Required SWPPP Contents
1. Erosion and sediment control component - The owner or operator must
prepare a SWPPP that includes erosion and sediment control practices.
a. Erosion and sediment control practices must be designed:
i. in conformance with the BB; or
ii. equivalent to the BB if deviating from Part III.B.1.a.i.
b. If the erosion and sediment control practices are designed in conformance
with Part III.B.1.a.ii., the SWPPP must include a demonstration of
equivalence to the BB.
c. At a minimum, the erosion and sediment control component of the
SWPPP must include the following:
i. Background information about the scope of the project, including
the location, type and size of project; and
ii. A site map/construction drawing(s) with north arrows for the project,
including a general location map. At a minimum, the site map must
show the total site area; all improvements; areas of disturbance;
areas that will not be disturbed; existing vegetation; on-site and
adjacent off-site surface water(s); floodplain/floodway boundaries;
wetlands and drainage patterns that could be affected by the
construction activity; existing and final contours; locations of
different soil types with boundaries; material, waste, borrow or
equipment storage areas located on adjacent properties; and
location(s) of the stormwater discharge(s) and receiving surface
water(s); and
iii. A description of the soil(s) present at the site, including an
identification of the Hydrologic Soil Group (HSG); and
iv. A phasing plan for the project and sequencing plans for all phases,
both of which must address clearing and grubbing, excavation and
grading, utility and infrastructure installation, final stabilization,
32
Page 903 of 1174
Page 904
Part III.B.1.c.iv.
and any other construction activity at the site that will result in soil
disturbance.
1. The phasing plan must include:
a. a map delineating and labeling the limits of soil
disturbance for all phases of a project; and
b. a table identifying the order and intended schedule of
when each phase will begin and end its sequencing
plan. The table must identify the total disturbed area
for each phase at any one time and the total disturbed
area for the overall project at any one time all on one
timeline showing all overlapping quantities of
disturbed area at any one time; and
2. A sequencing plan for a specific phase must include:
a. a table indicating the order and intended schedule of
construction activities within a phase, and
corresponding construction drawings with a
description of the work to be performed; and
b. all permanent and temporary stabilization measures;
and
v. A description of the minimum erosion and sediment control
practices to be installed or implemented for each construction
activity that will result in soil disturbance. Include a schedule that
identifies the timing of initial placement or implementation of each
erosion and sediment control practice and the minimum time
frames that each practice should remain in place or be
implemented; and
vi. A site map/construction drawing(s) showing the specific location(s),
size(s), and length(s) of each erosion and sediment control
practice; and
vii. The dimensions, material specifications, installation details, and
operation and maintenance requirements for all erosion and
sediment control practices. Include the location and sizing of any
33
Page 904 of 1174
Page 905
Part III.B.1.c.vii.
temporary sediment basins and structural practices that will be
used to divert flows from exposed soils; and
viii. A maintenance inspection schedule for the contractor(s) and
subcontractor(s) identified in Part III.A.7. to ensure continuous and
effective operation of the erosion and sediment control practices.
The maintenance inspection schedule must be in accordance with
the requirements in the BB technical standard; and
ix. A description of the pollution prevention measures that will be used
to control litter, construction chemicals and construction debris from
becoming a pollutant source in the stormwater discharges; and
x. A description and location of any stormwater discharges associated
with industrial activity other than construction at the site, including,
but not limited to, stormwater discharges from asphalt plants and
concrete plants located on the construction site; and
xi. Identification of any elements of the design that are not in
conformance with the design criteria in the BB technical standard.
Include the reason for the deviation or alternative design and
provide information which demonstrates that the deviation or
alternative design is equivalent to the technical standard.
2. SMP component – The owner or operator of construction activity identified in
Table 2 of Appendix B must prepare a SWPPP that includes SMPs.
a. SMPs must be designed in conformance with the applicable sizing criteria
in Part II.C.2.a., c., or d.; and
b. SMPs must be designed in conformance with the performance criteria:
i. in the DM; or
ii. equivalent to the DM if deviating from Part III.B.2.b.i.; or
iii. in the New York State Stormwater Management Design Manual,
dated January 2015 (2015 Design Manual), or equivalent to it, if the
following criteria are met:
34
Page 905 of 1174
Page 906
Part III.B.2.b.iii.1.
1. The eNOI is submitted in accordance with Part I.D. before
January 29, 2027 for construction activities that are either:
a. subject to governmental review and approval:
i. where the owner or operator made any
application to that governmental entity prior to
the effective date of this permit; and
ii. such application included a SWPPP developed
using the 2015 Design Manual or equivalent to
it; or
b. not subject to governmental review and approval:
i. where a fiscal allocation for the construction
activities has been developed and approved by
a governmental entity; and
ii. the SWPPP was developed using the 2015
Design Manual or equivalent to it; and
c. If SMPs are designed in conformance with Part III.B.2.b.ii., the SWPPP
must include the reason(s) for the deviation or alternative design and a
demonstration of equivalence to the DM; and
d. If SMPs are designed in conformance with Part III.B.2.b.iii., the SWPPP
must include supporting information or documentation demonstrating that
Part III.B.2.b.iii.1.a. or b. apply; and
e. The SMP component of the SWPPP must include the following:
i. Identification of all SMPs to be constructed as part of the project,
including which option the SMP designs conform to, either Part
III.B.2.b.i., ii., or iii. Include the dimensions, material specifications
and installation details for each SMP; and
ii. A site map/construction drawing(s) showing the specific location
and size of each SMP; and
35
Page 906 of 1174
Page 907
Part III.B.2.e.iii.
iii. A Stormwater Modeling and Analysis Report that includes:
(i) Map(s) showing pre-development conditions, including
watershed/subcatchments boundaries, flow
paths/routing, and design points; and
(ii) Map(s) showing post-development conditions, including
watershed/subcatchments boundaries, flow
paths/routing, design points and SMPs; and
(iii) Results of stormwater modeling (i.e. hydrology and
hydraulic analysis) for the required storm events. Include
supporting calculations (model runs), methodology, and a
summary table that compares pre- and post-development
runoff rates and volumes for the different storm events;
and
(iv) Summary table, with supporting calculations, which
demonstrates that each SMP has been designed in
conformance with the sizing criteria included in the DM;
and
(v) Identification of any sizing criteria that is not required
based on the requirements included in Part II.C.; and
(vi) Identification of any elements of the design that are not in
conformance with the performance criteria in the DM.
Include the reason(s) for the deviation or alternative
design and provide information which demonstrates that
the deviation or alternative design is equivalent to the
DM.
iv. Soil testing results and locations (test pits, borings); and
v. Infiltration test results, when required in accordance with Part
III.B.2.a.; and
vi. An operations and maintenance plan that includes inspection and
maintenance schedules and actions to ensure continuous and
effective operation of each SMP. The plan must identify the entity
36
Page 907 of 1174
Page 908
Part III.B.2.e.vi.
that will be responsible for the long-term operation and
maintenance of each practice; and
3. Enhanced Phosphorus Removal Standards - The owner or operator of
construction activity identified in Table 2 of Appendix B that is located in a
watershed identified in Appendix C must prepare a SWPPP that includes
SMPs designed in conformance with the applicable sizing criteria in Part
II.C.2.b., c., or d. and the performance criteria Enhanced Phosphorus
Removal Standards included in the DM. At a minimum, the SMP component
of the SWPPP must meet the requirements of Part III.B.2.
C. Required SWPPP Components by Project Type
Owners or operators of construction activities, identified in Table 1 of Appendix
B, are required to prepare a SWPPP that only includes erosion and sediment
control practices designed in accordance with Part III.B.1. Owners or operators of
the construction activities, identified in Table 2 of Appendix B, must prepare a
SWPPP that also includes SMPs designed in accordance with Part III.B.2 or 3.
For the entire area of disturbance, including the entire common plan of
development or sale if applicable, the owner or operator must evaluate every
bullet from Appendix B Table 1 and Table 2 separately. If bullets from both Table
1 and Table 2 apply, the SWPPP must include erosion and sediment control
practices for all construction activities but SMPs for only those portions of the
construction activities that fall under Table 2 bullet(s).
Part IV. Inspection and Maintenance Requirements
A. General Construction Site Inspection and Maintenance Requirements
1. The owner or operator must ensure that all erosion and sediment control
practices (including pollution prevention measures), and all SMPs identified in
the SWPPP, are inspected and maintained in accordance with Part IV.B. and
C.
B. Contractor Maintenance Inspection Requirements
1. The owner or operator of each construction activity, identified in Tables 1 and
2 of Appendix B, must have a trained contractor inspect the erosion and
sediment control practices and pollution prevention measures being
37
Page 908 of 1174
Page 909
Part IV.B.1.
implemented within the active work area daily to ensure that they are being
maintained in effective operating condition at all times. If deficiencies are
identified, the contractor must:
a. if the corrective action does not require engineering design:
i. begin implementing corrective actions within one business day; and
ii. complete the corrective actions within five business days; or
b. if the corrective action requires engineering design:
i. begin the engineering design process within five business days;
and
ii. complete the corrective action in a reasonable time frame but no
later than within 60 calendar days.
2. For construction sites where soil disturbance activities have been temporarily
suspended (e.g. winter shutdown) and temporary stabilization measures have
been applied to all disturbed areas, the trained contractor can stop conducting
the maintenance inspections in accordance with Part IV.B.1. The trained
contractor must begin conducting the maintenance inspections in accordance
with Part IV.B.1. as soon as soil disturbance activities resume.
3. For construction sites where soil disturbance activities have been shut down
with partial project completion, the trained contractor can stop conducting the
maintenance inspections in accordance with Part IV.B.1. if all areas disturbed
as of the project shutdown date have achieved final stabilization and all SMPs
required for the completed portion of the project have been constructed in
conformance with the SWPPP and are operational.
C. Qualified Inspector Inspection Requirements
1. With the exception of the following construction activities identified in Tables 1
and 2 of Appendix B, a qualified inspector must conduct site inspections for
all other construction activities identified in Tables 1 and 2 of Appendix B:
a. the construction of a single-family residential subdivision with 25% or less
impervious cover at total site build-out that involves a soil disturbance of
one (1) or more acres of land but less than or equal to five (5) acres and is
38
Page 909 of 1174
Page 910
Part IV.C.1.a.
not located in one of the watersheds listed in Appendix C and not directly
discharging to one of the 303(d) segments listed in Appendix D; and
b. the construction of a single-family home that involves soil disturbances of
one (1) or more acres but less than or equal to five (5) acres and is not
located in one of the watersheds listed in Appendix C and not directly
discharging to one of the 303(d) segments listed in Appendix D; and
c. construction on agricultural property that involves soil disturbances of one
(1) or more acres but less than five (5) acres; and
d. construction activities located in the New York City Watershed located
east of the Hudson River, see Appendix C Figure 1, that involve soil
disturbances of 5,000 square feet or more, but less than one acre.
2. The qualified inspector must conduct site inspections in accordance with the
following timetable:
a. For construction sites where soil disturbance activities are on-going, the
qualified inspector must conduct a site inspection at least once every
seven (7) calendar days; or
b. For construction sites where soil disturbance activities are on-going and
the owner or operator has received authorization in accordance with Part
I.E.6. to disturb greater than five (5) acres of soil at any one time, the
qualified inspector must conduct at least two (2) site inspections every
seven (7) calendar days. The two (2) inspections must be separated by a
minimum of two (2) full calendar days; or
c. For construction sites where soil disturbance activities have been
temporarily suspended (e.g. winter shutdown) and temporary stabilization
measures have been applied to all disturbed areas, the qualified inspector
must conduct a site inspection at least once every thirty (30) calendar
days. The owner or operator must notify the DOW Water (SPDES)
Program contact at the Regional Office (see contact information in
Appendix E) or, in areas under the jurisdiction of a Traditional Land Use
Control MS4 Operator, the Traditional Land Use Control MS4 Operator
(provided the Traditional Land Use Control MS4 Operator is not the owner
or operator of the construction activity) by hard copy or email prior to
reducing the inspections to this frequency and again by hard copy or email
prior to re-commencing construction; or
39
Page 910 of 1174
Page 911
Part IV.C.2.d.
d. For construction sites where soil disturbance activities have been shut
down with partial project completion, the requirement to have the qualified
inspector conduct inspections ceases if all areas disturbed as of the
project shutdown date have achieved final stabilization and all SMPs
required for the completed portion of the project have been constructed in
conformance with the SWPPP and are operational. The owner or operator
must notify the DOW Water (SPDES) Program contact at the Regional
Office (see contact information in Appendix E) or, in areas subject to the
review authority of Traditional Land Use Control MS4 Operator(s) in
accordance with Part I.D.2.b.ii.1., the Traditional Land Use Control MS4
Operator(s) (provided the Traditional Land Use Control MS4 Operator(s)
are not the owners or operators of the construction activity) in writing prior
to the shutdown and again in writing prior to resuming construction
activity. If soil disturbance activities are not resumed within 2 years from
the date of shutdown, the owner or operator must terminate coverage by
meeting the requirements of Part V; or
e. For construction sites involving soil disturbance of one (1) or more acres
that directly discharge to one of the 303(d) segments listed in Appendix D
or is located in one of the watersheds listed in Appendix C, the qualified
inspector must conduct at least two (2) site inspections every seven (7)
calendar days. The two (2) inspections must be separated by a minimum
of two (2) full calendar days.
3. At a minimum, the qualified inspector must inspect:
a. all erosion and sediment control practices and pollution prevention
measures to ensure integrity and effectiveness; and
b. all SMPs under construction to ensure that they are constructed in
conformance with the SWPPP; and
c. all areas of disturbance that have not achieved final stabilization; and
d. all points of discharge to surface waters of the State located within, or
immediately adjacent to, the property boundaries of the construction site;
and
e. all points of discharge from the construction site.
40
Page 911 of 1174
Page 912
Part IV.C.4.
4. The qualified inspector must prepare an inspection report subsequent to each
and every inspection. At a minimum, the inspection report must include and/or
address all of the following, for all construction activities except those listed in
Part IV.C.1.:
a. Permit identification number; and
b. Date and time of inspection; and
c. Name and title of person(s) performing inspection; and
d. A description of the weather and soil conditions (e.g. dry, wet, saturated)
at the time of the inspection, including the temperature at the time of the
inspection; and
e. A description of the condition of the runoff at all points of discharge from
the construction site. This must include identification of any discharges of
sediment from the construction site. Include discharges from conveyance
systems (i.e. pipes, culverts, ditches, etc.) and overland flow; and
f. A description of the condition of all surface waters of the State located
within, or immediately adjacent to, the property boundaries of the
construction site which receive runoff from disturbed areas. This must
include identification of any discharges of sediment to the surface waters
of the State; and
g. Identification of all erosion and sediment control practices and pollution
prevention measures that need repair or maintenance; and
h. Identification of all erosion and sediment control practices and pollution
prevention measures that were not installed properly or are not functioning
as designed and need to be reinstalled or replaced; and
i. Description and sketch (map) of areas with active soil disturbance activity,
areas that have been disturbed but are inactive at the time of the
inspection, and areas that have been stabilized (temporary and/or final)
since the last inspection; and
j. Estimates, in square feet or acres, of the following areas:
41
Page 912 of 1174
Page 913
Part IV.C.4.j.i.
i. Total area with active soil disturbance (not requiring either
temporary stabilization or final stabilization); and
ii. Total area with inactive soil disturbance (requiring either temporary
stabilization or final stabilization); and
iii. Total area that has achieved temporary stabilization; and
iv. Total area that has achieved final stabilization; and
k. Current stage of construction of all SMPs and identification of all
construction activity on site that is not in conformance with the SWPPP
and technical standards; and
l. Corrective action(s) that must be taken to install, repair, replace or
maintain erosion and sediment control practices and pollution prevention
measures; and to correct deficiencies identified with the construction of
the SMP(s); and
m. Identification and status of all corrective actions that were required by
previous inspection; and
n. Digital photographs, with date stamp, that clearly show the condition of all
practices that have been identified as needing corrective actions. The
qualified inspector must attach color copies of the digital photographs to
the inspection report being maintained onsite within seven (7) calendar
days of the date of the inspection. The qualified inspector must also take
digital photographs, with date stamp, that clearly show the condition of the
practice(s) after the corrective action has been completed. The qualified
inspector must attach paper color copies of the digital photographs to the
inspection report that documents the completion of the corrective action
work within seven (7) calendar days of that inspection.
5. Within one business day of the completion of an inspection, the qualified
inspector must notify the owner or operator, and appropriate contractor or
subcontractor identified in Part III.A.7., of any corrective actions that need to
be taken. The contractor or subcontractor must:
a. if the corrective action does not require engineering design:
42
Page 913 of 1174
Page 914
Part IV.C.5.a.i.
i. begin implementing corrective actions within one business day; and
ii. complete the corrective actions within five business days; or
b. if the corrective action requires engineering design:
i. begin the engineering design process within five business days;
and
ii. complete the corrective action in a reasonable time frame but no
later than within 60 calendar days.
6. All inspection reports must be signed by the qualified inspector. In
accordance with Part I.E.3., the inspection reports must be maintained on site
with the SWPPP.
Part V. How to Terminate CGP Coverage
A. Electronic Notice of Termination (eNOT) Submittal
The eNOT contains questions to ensure requirements in Part V.A. have been
met.
1. An owner or operator must terminate coverage when one or more of the
following requirements have been met:
a. Total project completion:
i. all construction activity identified in the SWPPP has been
completed; and
ii. all areas of disturbance have achieved final stabilization; and
iii. all temporary, structural erosion and sediment control measures
have been removed; and
iv. all SMPs have been constructed in conformance with the SWPPP
and are operational; and
v. an as-built drawing has been prepared; or
43
Page 914 of 1174
Page 915
Part V.A.1.b.
b. Planned shutdown with partial project completion:
i. all soil disturbance activities have ceased; and
ii. all areas disturbed as of the project shutdown date have achieved
final stabilization; and
iii. all temporary, structural erosion and sediment control measures
have been removed; and
iv. all SMPs required for the completed portion of the project have
been constructed in conformance with the SWPPP and are
operational; and
v. an as-built drawing has been prepared; or
c. In accordance with Part I.G. Change of Owner or Operator; or
d. The owner or operator has obtained coverage under an alternative
general SPDES permit or an individual SPDES permit.
2. For construction activities that require qualified inspector inspections in
accordance with Part IV.C.1. and have met Part V.A.1.a. or b., the owner or
operator must have the qualified inspector perform a final site inspection prior
to submitting the eNOT. The qualified inspector must, by signing the “Final
Stabilization” and “Post-Construction Stormwater Management Practice(s)”
certification statements on the eNOT, certify that all the requirements in Part
V.A.1.a. or b. have been achieved.
3. For construction activities that are subject to the review authority of
Traditional Land Use Control MS4 Operator(s) in accordance with Part
I.D.2.b.ii.1. and meet Part V.A.1.a. or b., the owner or operator must have the
Traditional Land Use Control MS4 Operator(s) sign the “MS4 Acceptance”
statement on the eNOT in accordance with the requirements in Part VII.J. A
Traditional Land Use Control MS4 Operator official, by signing this statement,
determined that it is acceptable for the owner or operator to submit the eNOT
in accordance with the requirements of this Part. A Traditional Land Use
Control MS4 Operator can make this determination by performing a final site
inspection themselves or by accepting the qualified inspector’s final site
inspection certification(s) when required in Part V.A.2.
44
Page 915 of 1174
Page 916
Part V.A.4.
4. For construction activities that require SMPs and meet Part V.A.1.a. or b., the
owner or operator must, prior to submitting the eNOT, ensure one of the
following:
a. for SMP(s) that were constructed by a private entity, but will be owned,
operated, and maintained by a public entity, the SMP(s) and any right-of-
way(s) needed to operate and maintain such practice(s) have been
deeded to the municipality in which the practice(s) is located; or
b. for SMP(s) that are privately owned, but will be operated and maintained
by a public entity, an executed operation and maintenance agreement is in
place with the municipality that will operate and maintain the SMP(s); or
c. for SMP(s) that are privately owned, the owner or operator has a
mechanism in place that requires operation and maintenance of the
practice(s) in accordance with the operation and maintenance plan, such
as a deed covenant in the owner or operator’s deed of record; or
d. for SMP(s) that are owned by a public or private institution (e.g. school,
university, hospital), government agency or authority, or public utility, the
owner or operator has policies and procedures in place that ensure
operation and maintenance of the practices in accordance with the
operation and maintenance plan.
5. An owner or operator that has met the requirements of Part V.A.1., 2., 3., and 4.
must request termination of coverage under this permit by submitting a complete
Notice of Termination form electronically using a NYSDEC approved form. 5
a. The owner’s or operator’s coverage is terminated as of the termination
date indicated in the Letter of Termination (LOT), which is sent by
NYSDEC after a complete eNOT is submitted.
5 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or (d). All waiver requests must
be submitted to [email protected] or NYSDEC, Bureau of Water Permits, 625 Broadway, 4th
Floor, Albany, New York 12233-3505.
45
Page 916 of 1174
Page 917
Part VI.
Part VI. Record Retention and Reporting
A. Record Retention
The owner or operator must retain a copy of the documents listed in Part I.E.3. and a
copy of the LOT for a period of at least five years from the date that NYSDEC
accepts a complete NOT submitted in accordance with Part V.
B. Reporting
Except for the eNOI, the signature forms associated with the eNOI, and the eNOT,
all other written correspondence requested by NYSDEC, including individual permit
applications, must be sent to the address of the appropriate DOW (SPDES) Program
contact at the Regional Office listed in Appendix E.
Part VII. Standard Permit Requirements
For the purposes of this permit, examples of contractors and subcontractors include:
third-party maintenance and construction contractors.
A. Duty to Comply
The owner or operator, and all contractors or subcontractors, must comply with all
requirements of this permit. Any non-compliance with the requirements of this permit
constitutes a violation of the New York State Environmental Conservation Law
(ECL), and its implementing regulations, and is grounds for enforcement action.
Filing of a request for termination of coverage under this permit, or a notification of
planned changes or anticipated non-compliance, does not limit, diminish or stay
compliance with any requirements of this permit.
B. Need to Halt or Reduce Activity Not a Defense
The necessity to halt or reduce the construction activity regulated by this permit, in
order to maintain compliance with the requirements of this permit, must not be a
defense in an enforcement action.
C. Penalties
There are substantial criminal, civil, and administrative penalties associated with
violating the requirements of this permit. Fines of up to $37,500 per day for each
46
Page 917 of 1174
Page 918
Part VII.C.
violation and imprisonment for up to 15 years may be assessed depending upon the
nature and degree of the offense.
D. False Statements
Any person who knowingly makes any false material statement, representation, or
certification in any application, record, report, or other document filed or required to
be maintained under this permit, including monitoring reports or reports of
compliance or noncompliance must, upon conviction, be punished in accordance
with ECL §71-1933 and or New York State Penal Law Articles 175 and 210.
E. Re-Opener Clause
Upon issuance of this permit, a determination has been made on the basis of a
submitted Notice of Intent, plans, or other available information, that compliance with
the specified permit requirements will reasonably protect classified water use and
assure compliance with applicable water quality standards. Satisfaction of the
requirements of this permit notwithstanding, if operation pursuant to this permit
causes or contributes to a condition in contravention of State water quality standards
or guidance values, or if NYSDEC determines that a modification is necessary to
prevent impairment of the best use of the waters or to assure maintenance of water
quality standards or compliance with other provisions of ECL Article 17 or the Clean
Water Act (CWA), or any regulations adopted pursuant thereto, NYSDEC may
require such modification and the Commissioner may require abatement action to be
taken by the owner or operator and may also prohibit such operation until the
modification has been implemented.
F. Duty to Mitigate
The owner or operator, and its contractors and subcontractors, must take all
reasonable steps to minimize or prevent any discharge in violation of this permit
which has a reasonable likelihood of adversely affecting human health or the
environment.
G. Requiring Another General Permit or Individual SPDES Permit
NYSDEC may require any owner or operator authorized to discharge in accordance
with this permit to apply for and obtain an individual SPDES permit or apply for
authorization to discharge in accordance with another general SPDES permit.
1. Cases where an individual SPDES permit or authorization to discharge in
accordance with another general SPDES permit may be required include, but is
not limited to the following:
47
Page 918 of 1174
Page 919
Part VII.G.1.a.
a. the owner or operator is not in compliance with the conditions of this
permit or does not meet the requirements for coverage under this permit;
and
b. a change has occurred in the availability of demonstrated technology or
practices for the control or abatement of pollutants applicable to the point
source; and
c. new effluent limitation guidelines or new source performance standards
are promulgated that are applicable to point sources authorized to
discharge in accordance with this permit; and
d. existing effluent limitation guidelines or new source performance
standards that are applicable to point sources authorized to discharge in
accordance with this permit are modified; and
e. a water quality management plan containing requirements applicable to
such point sources is approved by NYSDEC; and
f. circumstances have changed since the time of the request to be covered
so that the owner or operator is no longer appropriately controlled under
this permit, or either a temporary or permanent reduction or elimination of
the authorized discharge is necessary; and
g. the discharge is in violation of section 17-0501 of the ECL; and
h. the discharge(s) is a significant contributor of pollutants. In making this
determination, NYSDEC may consider the following factors:
i. the location of the discharge(s) with respect to surface waters of the
State; and
ii. the size of the discharge(s); and
iii. the quantity and nature of the pollutants discharged to surface
waters of the State; and
iv. other relevant factors including compliance with other provisions of
ECL Article 17, or the CWA.
2. When NYSDEC requires any owner or operator authorized by this permit to apply
for an individual SPDES permit as provided for in this subdivision, it must notify
the owner or operator in writing that a permit application is required. This notice
must include a brief statement of the reasons for this decision, an application
48
Page 919 of 1174
Page 920
Part VII.G.2.
form, a statement setting a time for the owner or operator to file the application
for an individual SPDES permit, and a deadline, not sooner than 180 days from
the owner’s or operator's receipt of the notification letter, whereby the
authorization to discharge under this permit must be terminated. NYSDEC may
grant additional time upon demonstration, to the satisfaction of the RWE, 6 that
additional time to apply for an alternative authorization is necessary or where
NYSDEC has not provided a permit determination in accordance with 6 NYCRR
Part 621.
3. When an individual SPDES permit is issued to an owner or operator authorized
to discharge under this permit for the same discharge(s), this permit authorization
for construction activities authorized under the individual SPDES permit is
automatically terminated on the effective date of the individual SPDES permit
unless termination is earlier in accordance with 6 NYCRR Part 750.
H. Duty to Provide Information
The owner or operator must furnish to NYSDEC, within five business days,
unless otherwise set forth by NYSDEC, any information that NYSDEC may request
to determine whether cause exists to determine compliance with this permit or to
determine whether cause exists for requiring an individual SPDES permit in
accordance with 6 NYCRR 750-1.21(e) (see Part VII.G. Requiring Another General
Permit or Individual Permit).
The owner or operator must make available to NYSDEC, for inspection and copying,
or furnish to NYSDEC within 25 business days of receipt of a NYSDEC request for
such information, any information retained in accordance with this permit.
Except for Part I.D.4. and 5. and Part I.G., the following applies: where the owner or
operator becomes aware that it failed to submit any relevant facts on the Notice of
Intent, or submitted incorrect information in a Notice of Intent or in any report to
NYSDEC, the owner or operator must submit such facts or corrected information to
NYSDEC within five business days.
I. Extension
In the event a new permit is not issued and effective prior to the expiration of this
permit, and this permit is extended pursuant to the State Administrative Procedure
Act and 6 NYCRR Part 621, then the owner or operator with coverage under this
permit may continue to operate and discharge in accordance with the requirements
of this permit until a new permit is issued and effective.
6 The Regional Water Manager where a DEC Region does not have a RWE.
49
Page 920 of 1174
Page 921
Part VII.J.
J. Signatories and Certification
The Notice of Intent, Notice of Termination, and reports required by this permit must
be signed as provided in 40 CFR §122.22.
1. All Notices of Intent and Notices of Termination must be signed as follows:
a. For a corporation. By a responsible corporate officer. For the purpose of
this section, a responsible corporate officer means:
(i) a president, secretary, treasurer, or vice-president of the corporation
in charge of a principal business function, or any other person who
performs similar policy- or decision-making functions for the
corporation; or
(ii) the manager of one or more manufacturing, production or operating
facilities, provided, the manager is authorized to make management
decisions which govern the operation of the regulated facility
including having the explicit or implicit duty of making major capital
investment recommendations, and initiating and directing other
comprehensive measures to assure long term environmental
compliance with environmental laws and regulations; the manager
can ensure that the necessary systems are established or actions
taken to gather complete and accurate information for Notice of Intent
or Notice of Termination requirements; and where authority to sign
documents has been assigned or delegated to the manager in
accordance with corporate procedures.
Note: NYSDEC does not require specific assignments or delegations of
authority to responsible corporate officers identified in 40 CFR
§122.22(a)(1)(i). NYSDEC will presume that these responsible corporate
officers have the requisite authority to sign the Notice of Intent or Notice of
Termination unless the corporation has notified NYSDEC to the contrary.
Corporate procedures governing authority to sign a Notice of Intent or
Notice of Termination may provide for assignment or delegation to
applicable corporate positions under 40 CFR §122.22(a)(1)(ii) rather than
to specific individuals.
b. For a partnership or sole proprietorship. By a general partner or the
proprietor, respectively.
50
Page 921 of 1174
Page 922
Part VII.J.1.c.
c. For a municipality, State, Federal, or other public agency. By either a
principal executive officer or ranking elected official. For purposes of this
section, a principal executive officer of a Federal agency includes:
1. the chief executive officer of the agency; or
2. a senior executive officer having responsibility for the overall
operations of a principal geographic unit of the agency (e.g.,
Regional Administrators of EPA).
2. All reports required by this permit, and other information requested by
NYSDEC, must be signed by a person described in Part VII.J.1., or by a duly
authorized representative of that person. A person is a duly authorized
representative only if:
a. The authorization is made in writing by a person described in Part VII.J.1.
or using the Duly Authorized Form, found on the DEC website; and
b. The authorization specifies either an individual or a position having
responsibility for the overall operation of the regulated facility or activity,
position of equivalent responsibility, or an individual or position having
overall responsibility for environmental matters for the company. (A duly
authorized representative may thus be either a named individual or any
individual occupying a named position); and
c. The written authorization is submitted to NYSDEC.
3. Changes to authorization. If an authorization under Part VII.J.2. is no longer
accurate because a different individual or position has responsibility for the
overall operation of the construction activity, a new authorization satisfying
the requirements of Part VII.J.2. must be submitted to NYSDEC prior to or
together with any reports, information, or applications to be signed by an
authorized representative.
4. Certification. Any person signing a document under Part VII.J.1. or 2. must
make the following certification:
I certify under penalty of law that this document and all attachments were
prepared under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who
51
Page 922 of 1174
Page 923
Part VII.J.4.
manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations.
5. Electronic reporting. If documents described in Part VII.J.1. or 2. are
submitted electronically by or on behalf of the construction activity with
coverage under this permit, any person providing the electronic signature for
such documents must meet all relevant requirements of this section, and
must ensure that all of the relevant requirements of 40 CFR Part 3 (including,
in all cases, subpart D to Part 3) (Cross-Media Electronic Reporting) and 40
CFR Part 127 (NPDES Electronic Reporting Requirements) are met for that
submission.
K. Inspection and Entry
The owner or operator must allow NYSDEC, the USEPA Regional Administrator, the
applicable county health department, or any authorized representatives of those
entities, or, in the case of a construction site which discharges through an MS4, an
authorized representative of the MS4 receiving the discharge, upon the presentation
of credentials and other documents as may be required by law, to:
1. enter upon the owner’s or operator's premises where a regulated facility or
activity is located or conducted or where records must be kept under the
requirements of this permit; and
2. have access to and copy at reasonable times, any records that must be kept
under the requirements of this permit, including records required to be
maintained for purposes of operation and maintenance; and
3. inspect at reasonable times any facilities, equipment (including monitoring
and control equipment), practices or operations regulated or required under
this permit; and
4. sample or monitor at reasonable times, for the purposes of assuring general
SPDES permit compliance or as otherwise authorized by the CWA or ECL,
any substances or parameters at any location; and
5. enter upon the property of any contributor to the regulated facility or activity
under authority of the owner or operator.
52
Page 923 of 1174
Page 924
Part VII.L.
L. Confidentiality of Information
The following must not be held confidential: this permit, the fact sheet for this permit,
the name and address of any owner or operator, effluent data, the Notice of Intent,
and information regarding the need to obtain an individual permit or an alternative
general SPDES permit. This includes information submitted on forms themselves
and any attachments used to supply information required by the forms (except
information submitted on usage of substances). Upon the request of the owner or
operator, NYSDEC must make determinations of confidentiality in accordance with 6
NYCRR Part 616, except as set forth in the previous sentence. Any information
accorded confidential status must be disclosed to the Regional Administrator upon
his or her written request. Prior to disclosing such information to the Regional
Administrator, NYSDEC will notify the Regional Administrator of the confidential
status of such information.
M. Other Permits May Be Required
Nothing in this permit relieves the owner or operator from a requirement to obtain
any other permits required by law.
N. NYSDEC Orders or Civil Decrees/Judgments
The issuance of this permit by the NYSDEC, and the coverage under this permit by
the owner or operator, does not supersede, revoke, or rescind any existing order on
consent or civil Decree/Judgment, or modification to any such documents or to any
order issued by the Commissioner, or any of the terms, conditions, or requirements
contained in such order or modification therefore, unless expressly noted.
O. Property Rights
Coverage under this permit does not convey any property rights in either real or
personal property, or any exclusive privileges, nor does it authorize any injury to
private property or any invasion of personal rights, nor any infringement of Federal,
State, or local laws or regulations, nor does it obviate the necessity of obtaining the
assent of any other jurisdiction as required by law for the discharge authorized.
P. Compliance with Interstate Standards
If the construction activity covered by this permit originates within the jurisdiction of
an interstate water pollution control agency, then the construction activity must also
comply with any applicable effluent standards or water quality standards
promulgated by that interstate agency and as set forth in this permit for such
construction activities.
53
Page 924 of 1174
Page 925
Part VII.Q.
Q. Oil and Hazardous Substance Liability
Coverage under this permit does not affect the imposition of responsibilities upon, or
the institution of any legal action against, the owner or operator under section 311 of
the CWA, which must be in conformance with regulations promulgated pursuant to
section 311 governing the applicability of section 311 of the CWA to discharges from
facilities with NPDES permits, nor must such issuance preclude the institution of any
legal action or relieve the owner or operator from any responsibilities, liabilities, or
penalties to which the owner or operator is or may be subject pursuant to the
Comprehensive Environmental Response, Compensation and Liability Act of 1980,
42 U.S.C. section 9601 et seq. (CERCLA).
R. Severability
The provisions of this permit are severable, and if any provision of this permit, or the
application of any provision of this permit to any circumstance, is held invalid, the
application of such provision to other circumstances, and the remainder of this
permit, must not be affected thereby.
S. NYSDEC Approved Forms
The owner or operator must provide all relevant information that is requested by
NYSDEC, and required by this permit, on all NYSDEC approved forms.
54
Page 925 of 1174
Page 926
Appendix A
APPENDIX A – Abbreviations and Definitions
Abbreviations
APO – Agency Preservation Officer
BB – New York State Standards and Specifications for Erosion and Sediment Control
(Blue Book), dated November 2016
BMP – Best Management Practice
CPESC – Certified Professional in Erosion and Sediment Control
CPv – Channel Protection Volume
CWA – Clean Water Act (or the Federal Water Pollution Control Act, 33 U.S.C. §1251 et
seq)
DM – New York State Stormwater Management Design Manual (Design Manual), dated
July 31, 2024
DOW – Division of Water
EAF – Environmental Assessment Form
ECL – chapter 43-B of the Consolidated Laws of the State of New York, entitled the
Environmental Conservation Law
EPA – U.S. Environmental Protection Agency
HSG – Hydrologic Soil Group
MS4 – Municipal Separate Storm Sewer System
NOI – Notice of Intent
NOT – Notice of Termination
NPDES – National Pollutant Discharge Elimination System
NYC – The City of New York
NYCDEP – The City of New York Department of Environmental Protection
NYSDEC – The New York State Department of Environmental Conservation
OPRHP – Office of Parks, Recreation and Historic Places
Qf – Extreme Flood
Qp – Overbank Flood
RR – Runoff Reduction
RRv – Runoff Reduction Volume
RWE – Regional Water Engineer
SEQR – State Environmental Quality Review Act
SHPA – State Historic Preservation Act
SMP – Post-Construction Stormwater Management Practice
SPDES – State Pollutant Discharge Elimination System
SWPPP – Stormwater Pollution Prevention Plan
TMDL – Total Maximum Daily Load
UPA – Uniform Procedures Act
USDA – United States Department of Agriculture
WQv – Water Quality Volume
55
Page 926 of 1174
Page 927
Appendix A
Definitions
All definitions in this section are solely for the purposes of this permit. If a word is not
italicized in the permit, use its common definition.
Agricultural Building – a structure designed and constructed to house farm
implements, hay, grain, poultry, livestock or other horticultural products; excluding any
structure designed, constructed or used, in whole or in part, for human habitation, as a
place of employment where agricultural products are processed, treated or packaged,
or as a place used by the public.
Agricultural Property – the land for construction of a barn, agricultural building, silo,
stockyard, pen or other structural practices identified in Table II in the “Agricultural Best
Management Practice Systems Catalogue” (dated June 2023).
Alter Hydrology from Pre- to Post-Development Conditions – the post-development
peak flow rate(s) has increased by more than 5% of the pre-developed condition for the
design storm of interest (e.g. 10 yr and 100 yr).
Combined Sewer System – a sewer system which conveys sewage and stormwater
through a single pipe system to a publicly owned treatment works.
Commence (Commencement of) Construction Activities – the initial disturbance of
soils associated with clearing, grading or excavation activities; or other construction
related activities that disturb or expose soils such as demolition, stockpiling of fill
material, and the initial installation of erosion and sediment control practices required in
the SWPPP. See definition for “Construction Activity(ies)” also.
Common Plan of Development or Sale – a contiguous area where multiple separate
and distinct construction activities are occurring, or may occur, under one plan. The
“common plan” of development or sale is broadly defined as any announcement or
piece of documentation (including a sign, public notice or hearing, marketing plan,
advertisement, drawing, permit application, State Environmental Quality Review Act
(SEQR) environmental assessment form or other documents, zoning request, computer
design, etc.) or physical demarcation (including boundary signs, lot stakes, surveyor
markings, etc.) indicating construction activities may occur on a specific plot. A common
plan of development or sale is comprised of two or more phases.
Common plan of development or sale does not include separate and distinct
construction activities that are occurring, or may occur, under one plan that are at least
1/4 mile apart provided any interconnecting road, pipeline or utility project that is part of
the same “common plan” is not concurrently being disturbed.
56
Page 927 of 1174
Page 928
Appendix A
Construction Activity(ies) – identified within 40 CFR 122.26(b)(14)(x),
122.26(b)(15)(i), and 122.26(b)(15)(ii), any clearing, grading, excavation, filling,
demolition or stockpiling activities that result in soil disturbance. Clearing activities can
include, but are not limited to, mechanized logging equipment operation, the cutting and
skidding of trees, stump removal and/or brush root removal.
Construction activity does not include routine maintenance that is performed to maintain
the original line and grade, hydraulic capacity, or original purpose of a facility, which is
excluded from the calculation of the soil disturbance for a project. Routine maintenance
includes, but is not limited to:
Re-grading of gravel roads or parking lots; and
Cleaning and shaping of existing roadside ditches and culverts that maintains
the approximate original line and grade, and maintains or improves the
hydraulic capacity of the ditch; and
Replacement of existing culverts that maintains the approximate original line
and grade, and maintains or improves the hydraulic capacity of a ditch; and
Replacement of existing bridges that maintains the approximate original line
and grade, and maintains or improves the hydraulic capacity beneath the
bridges; and
Cleaning and shaping of existing roadside ditches that does not maintain the
approximate original grade, hydraulic capacity and purpose of the ditch if the
changes to the line and grade, hydraulic capacity or purpose of the ditch are
installed to improve water quality and quantity controls (e.g. installing grass
lined ditch); and
Placement of aggregate shoulder backing that stabilizes the transition between
the road shoulder and the ditch or embankment; and
Full depth milling and filling of existing asphalt pavements, replacement of
concrete pavement slabs, and similar work that does not expose soil or disturb
the bottom six (6) inches of subbase material; and
Long-term use of equipment storage areas at or near highway maintenance
facilities; and
Removal of sediment from the edge of the highway to restore a previously
existing sheet-flow drainage connection from the highway surface to the
highway ditch or embankment; and
Existing use of Canal Corp owned upland disposal sites for the canal, and
Replacement of curbs, gutters, sidewalks and guide rail posts; and
Maintenance of ski trails including brush hog use and mowing; and
Above ground snowmaking pipe replacement; and
Replacement of existing utility poles; etc.
Construction Site – the land area where construction activity(ies) will occur. See also
the definitions for “Commence (Commencement of) Construction Activities” and
“Common Plan of Development or Sale.”
57
Page 928 of 1174
Page 929
Appendix A
Dewatering – the act of draining rainwater and/or groundwater from building
foundations, vaults or excavations/trenches.
Directly Discharge(s)(ing) (to a specific surface waterbody) – runoff flows from a
construction site by overland flow and the first point of discharge is the specific surface
waterbody, or runoff flows from a construction site to a separate storm sewer system
and the first point of discharge from the separate storm sewer system is the specific
surface waterbody.
Discharge(s)(d) – any addition of any pollutant to waters of the State through an outlet
or point source.
Embankment – an earthen or rock slope that supports a road/highway.
Equivalent (Equivalence) – the practice or measure meets all the performance,
longevity, maintenance, and safety objectives of the technical standard and will provide
an equal or greater degree of water quality protection.
Final Stabilization – all soil disturbance activities have ceased and a uniform, perennial
vegetative cover with a density of eighty (80) percent over the entire pervious surface
has been established; or other equivalent stabilization measures, such as permanent
landscape mulches, rock rip-rap or washed/crushed stone have been applied on all
disturbed areas that are not covered by permanent structures, concrete or pavement.
Historic Property – any building, structure, site, object or district that is listed on the
State or National Registers of Historic Places or is determined to be eligible for listing on
the State or National Registers of Historic Places.
Impervious Area (Cover) – all impermeable surfaces that cannot effectively infiltrate
rainfall. This includes paved, concrete and compacted gravel surfaces (i.e. parking lots,
driveways, roads, runways and sidewalks); building rooftops and miscellaneous
impermeable structures such as patios, pools, and sheds.
Infeasible – not technologically possible, or not economically practicable and
achievable considering best industry practices.
Minimize(ing)(ation) – reduce and/or eliminate to the extent achievable using control
measures (including best management practices) that are technologically available and
economically practicable and achievable in light of best industry practices.
Municipal Separate Storm Sewer System (MS4) - a conveyance or system of
conveyances (including roads with drainage systems, municipal streets, catch basins,
curbs, gutters, ditches, man-made channels, or storm drains):
58
Page 929 of 1174
Page 930
Appendix A
1. owned or operated by a State, city, town, village, borough, county, parish,
district, association, or other public body (created by or pursuant to State
law) having jurisdiction over disposal of sewage, industrial wastes,
stormwater, or other wastes, including special districts under State law such
as a sewer district, flood control district or drainage district, or similar entity,
or an Indian tribe or an authorized Indian tribal organization, or a designated
and approved management agency under section 208 of the CWA, that
discharges to surface waters of the State; and
2. designed or used for collecting or conveying stormwater; and
3. which is not a combined sewer system; and
4. which is not part of a Publicly Owned Treatment Works (POTW) as defined
at 40 CFR 122.2.
Natural Buffer(s) – an undisturbed area with natural cover running along a surface
water (e.g. wetland, stream, river, lake, etc.).
New Development – any land disturbance that does not meet the definition of
Redevelopment Activity included in this appendix.
New York State Erosion and Sediment Control Certificate Program – a certificate
program that establishes and maintains a process to identify and recognize individuals
who are capable of developing, designing, inspecting and maintaining erosion and
sediment control plans on projects that disturb soils in New York State. The certificate
program is administered by the New York State Conservation District Employees
Association.
Nonpoint Source(s) – any source of water pollution or pollutants which is not a discrete
conveyance or point source permitted pursuant to Title 7 or 8 of Article 17 of the
Environmental Conservation Law (see ECL Section 17-1403).
Overbank – flow events that exceed the capacity of the stream channel and spill out
into the adjacent floodplain.
Owner or Operator – the person, persons, or legal entity which owns or leases the
property on which the construction activity is occurring; an entity that has operational
control over the construction plans and specifications, including the ability to make
modifications to the plans and specifications; and/or an entity that has day-to-day
operational control of those activities at a project that are necessary to ensure
compliance with the permit requirements.
59
Page 930 of 1174
Page 931
Appendix A
Performance Criteria – the six performance criteria for each group of SMPs in
Chapters 5 and 6 of the technical standard, New York State Stormwater Management
Design Manual (DM), dated July 31, 2024. These include feasibility, conveyance,
pretreatment, treatment, landscaping, and maintenance. It does not include the Sizing
Criteria (i.e. WQv, RRv, CPv, Qp and Qf) in Part I.C.2. of the permit.
Phase – a defined area in which construction activities are occurring or will occur
separate from other defined area(s).
Point Source – any discernible, confined, and discrete conveyance, including but
not limited to any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container,
rolling stock, concentrated animal feeding operation, vessel or other floating craft, or
landfill leachate collection system from which pollutants are or may be discharged.
Pollutant(s) – dredged spoil, filter backwash, solid waste, incinerator residue, sewage,
garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive
materials, heat, wrecked or discarded equipment, rock, sand and industrial, municipal,
agricultural waste and ballast discharged into water; which may cause or might
reasonably be expected to cause pollution of the waters of the state in contravention of
the standards or guidance values adopted as provided in 6 NYCRR Parts 700 et seq.
Qualified Inspector – a person that is knowledgeable in the principles and practices of
erosion and sediment control, such as a licensed Professional Engineer, Certified
Professional in Erosion and Sediment Control (CPESC), Registered Landscape
Architect, New York State Erosion and Sediment Control Certificate Program holder or
other NYSDEC endorsed individual(s).
It can also mean someone working under the direct supervision of, and at the same
company as, the licensed Professional Engineer or Registered Landscape Architect,
provided that person has training in the principles and practices of erosion and sediment
control. Training in the principles and practices of erosion and sediment control means
that the individual working under the direct supervision of the licensed Professional
Engineer or Registered Landscape Architect has received four (4) hours of NYSDEC
endorsed training in proper erosion and sediment control principles from a Soil and
Water Conservation District, or other NYSDEC endorsed entity. After receiving the initial
training, the individual working under the direct supervision of the licensed Professional
Engineer or Registered Landscape Architect shall receive four (4) hours of training
every three (3) years.
It can also mean a person that meets the Qualified Professional qualifications in
addition to the Qualified Inspector qualifications.
Note: Inspections of any SMPs that include structural components, such as a dam for
an impoundment, shall be performed by a licensed Professional Engineer.
60
Page 931 of 1174
Page 932
Appendix A
Qualified Professional – a person that is knowledgeable in the principles and practices
of stormwater management and treatment, such as a licensed Professional Engineer,
Registered Landscape Architect or other NYSDEC endorsed individual(s). Individuals
preparing SWPPPs that require the SMP component must have an understanding of the
principles of hydrology, water quality management practice design, water quantity
control design, and, in many cases, the principles of hydraulics. All components of the
SWPPP that involve the practice of engineering, as defined by the NYS Education Law
(see Article 145), shall be prepared by, or under the direct supervision of, a professional
engineer licensed to practice in the State of New York.
Redevelopment Activity(ies) – the disturbance and reconstruction of existing
impervious area, including impervious areas that were removed from a project site
within five (5) years of preliminary project plan submission to the local government (i.e.
site plan, subdivision, etc.).
Renewable Energy – electricity or thermal energy generated by renewable energy
systems through use of the following technologies: solar thermal, photovoltaics, on land
and offshore wind, hydroelectric, geothermal electric, geothermal ground source heat,
tidal energy, wave energy, ocean thermal, and fuel cells which do not utilize a fossil fuel
resource in the process of generating electricity.
Site Limitations – site conditions that prevent the use of an infiltration technique and or
infiltration of the total WQv. Typical site limitations include: seasonal high groundwater,
shallow depth to bedrock, and soils with an infiltration rate less than 0.5 inches/hour.
The existence of site limitations shall be confirmed and documented using actual field
testing (i.e. test pits, soil borings, and infiltration test) or using information from the most
current United States Department of Agriculture (USDA) Soil Survey for the County
where the project is located.
Sizing Criteria – the criteria included in Part I.C.2 of the permit that are used to size
SMPs. The criteria include; Water Quality Volume (WQv), Runoff Reduction Volume
(RRv), Channel Protection Volume (Cpv), Overbank Flood (Qp), and Extreme Flood
(Qf).
Steep Slope – land area designated on the current United States Department of
Agriculture (USDA) Soil Survey as Soil Slope Phase D, (provided the map unit name or
description is inclusive of slopes greater than 25%), or Soil Slope Phase E or F,
(regardless of the map unit name), or a combination of the three designations.
Stormwater – that portion of precipitation that, once having fallen to the ground, is in
excess of the evaporative or infiltrative capacity of soils, or the retentive capacity of
surface features, which flows or will flow off the land by surface runoff to waters of the
State.
61
Page 932 of 1174
Page 933
Appendix A
Streambank – the terrain alongside the bed of a creek or stream. The bank consists of
the sides of the channel, between which the flow is confined.
Stormwater Pollution Prevention Plan (SWPPP) – a project specific report, including
construction drawings, that among other things: describes the construction activity(ies),
identifies the potential sources of pollution at the construction site; describes and shows
the stormwater controls that will be used to control the pollutants (i.e. erosion and
sediment controls; for many projects, includes SMPs); and identifies procedures the
owner or operator will implement to comply with the requirements of the permit. See
Part III of the permit for a complete description of the information that must be included
in the SWPPP.
Surface Waters of the State – shall be construed to include lakes, bays, sounds,
ponds, impounding reservoirs, springs, rivers, streams, creeks, estuaries, marshes,
inlets, canals, the Atlantic ocean within the territorial seas of the state of New York and
all other bodies of surface water, natural or artificial, inland or coastal, fresh or salt,
public or private (except those private waters that do not combine or effect a junction
with natural surface waters), which are wholly or partially within or bordering the state or
within its jurisdiction. Waters of the state are further defined in 6 NYCRR Parts 800 to
941.
Temporarily Ceased – an existing disturbed area will not be disturbed again within 14
calendar days of the previous soil disturbance.
Temporary Stabilization – exposed soil has been covered with material(s) as set forth
in the technical standard, New York Standards and Specifications for Erosion and
Sediment Control, to prevent the exposed soil from eroding. The materials can include,
but are not limited to, mulch, seed and mulch, and erosion control mats (e.g. jute twisted
yarn, excelsior wood fiber mats).
Total Maximum Daily Load (TMDL) – the sum of the allowable loads of a single
pollutant from all contributing point and nonpoint sources. It is a calculation of the
maximum amount of a pollutant that a waterbody can receive and still meet water
quality standards, and an allocation of that amount to the pollutant's sources. A TMDL
stipulates Waste Load Allocations (WLA) for point source discharges, Load Allocations
(LA) for nonpoint sources, and a margin of safety (MOS).
Traditional Land Use Control MS4 Operator – a city, town, or village with land use
control authority that is authorized to discharge under New York State DEC’s SPDES
General Permit For Stormwater Discharges from Municipal Separate Stormwater Sewer
Systems (MS4s) or the City of New York’s Individual SPDES Permit for their Municipal
Separate Storm Sewer Systems (NY-0287890).
Trained Contractor – an employee from the contracting (construction) company,
identified in Part III.A.7., that has received four (4) hours of NYSDEC endorsed training
62
Page 933 of 1174
Page 934
Appendix A
in proper erosion and sediment control principles from a Soil and Water Conservation
District, or other NYSDEC endorsed entity. After receiving the initial training, the trained
contractor shall receive four (4) hours of training every three (3) years.
It can also mean an employee from the contracting (construction) company, identified in
Part III.A.7., that meets the qualified inspector qualifications (e.g. licensed Professional
Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered
Landscape Architect, New York State Erosion and Sediment Control Certificate
Program holder, or someone working under the direct supervision of, and at the same
company as, the licensed Professional Engineer or Registered Landscape Architect,
provided they have received four (4) hours of NYSDEC endorsed training in proper
erosion and sediment control principles from a Soil and Water Conservation District, or
other NYSDEC endorsed entity).
The trained contractor is responsible for the day-to-day implementation of the SWPPP.
Tree Clearing – construction activities limited to felling and removal of trees.
Tree clearing does not include hand felling and leaving the trees in place with no
support from mechanized equipment, which is not considered construction activity
requiring coverage under this permit.
Water Quality Standard – such measures of purity or quality for any waters in relation
to their reasonable and necessary use as promulgated in 6 NYCRR Part 700 et seq.
63
Page 934 of 1174
Page 935
Appendix B
APPENDIX B – Required SWPPP Components by Project Type
Table 1
CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP
THAT ONLY INCLUDES EROSION AND SEDIMENT CONTROLS
The following construction activities that involve soil disturbances of one (1) or more acres of
land, but less than five (5) acres:
• Single-family home not located in one of the watersheds listed in Appendix C and not directly
discharging to one of the 303(d) segments listed in Appendix D
• Single-family residential subdivisions with 25% or less impervious cover at total site build-out and
not located in one of the watersheds listed in Appendix C and not directly discharging to one of the
303(d) segments listed in Appendix D
• Construction of a barn or other agricultural building, silo, stock yard or pen.
• Structural agricultural conservation practices as identified in Table II in the “Agricultural Best
Management Practice Systems Catalogue” (dated June 2023) that include construction or
reconstruction of impervious area or alter hydrology from pre- to post-development conditions.
The following construction activities that involve soil disturbances between five thousand (5000)
square feet and one (1) acre of land:
• All construction activities located in the New York City Watershed located east of the Hudson River,
see Appendix C Figure 1, that involve soil disturbances between five thousand (5,000) square feet
and one (1) acre of land.
Within the municipal boundaries of NYC:
• Stand-alone road reconstruction, where the total soil disturbance from only that road construction, is
less than one (1) acre of land.
The following construction activities:
• Installation of underground linear utilities; such as gas lines, fiber-optic cable, cable TV,
electric, telephone, sewer mains, and water mains
• Environmental enhancement projects, such as wetland mitigation, stormwater retrofits, stream
restoration, and resiliency projects that reconstruct shoreline areas to address sea level rise
• Pond construction
• Linear bike paths running through areas with vegetative cover, including bike paths surfaced with an
impervious cover
• Cross-country ski trails, walking/hiking trails, and mountain biking trails, including a de minimis
parking lot (maximum 10 spaces total, sized for passenger cars) with 35 feet minimum preservation
of undisturbed area downgradient from the parking lot
• Dam rehabilitation (the structure of the dam itself)
• Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are not part of
residential, commercial, or institutional development;
• Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that include incidental
shoulder or curb work along an existing highway to support construction of the sidewalk, bike path,
or walking path.
64
Page 935 of 1174
Page 936
Appendix B
Table 1 (Continued)
CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP
THAT ONLY INCLUDES EROSION AND SEDIMENT CONTROLS
The following construction activities:
• Slope stabilization
• Slope flattening that changes the grade of the site, but does not significantly change the runoff
characteristics
• Spoil areas that will be covered with vegetation
• Vegetated open space (i.e. recreational parks, lawns, meadows, fields, downhill ski trails) that do
not alter hydrology from pre- to post-development conditions
• Athletic fields (natural grass) that do not include the construction or reconstruction of impervious
area and do not alter hydrology from pre- to post-development conditions
• Demolition where vegetation will be established, and no redevelopment activity is planned1
• Installation or replacement of either an overhead electric transmission line or a ski lift tower that
does not include the construction of permanent access roads or parking areas surfaced with
impervious cover.
• Solar array field areas that have tables elevated off the ground, spaced one table width apart, do
not alter hydrology from pre- to post-development conditions, and address water quality volume and
runoff reduction volume by maintaining sheet flow on slopes less than 8%.
• Structural agricultural conservation practices as identified in Table II in the “Agricultural Best
Management Practice Systems Catalogue” (dated June 2023) that do not include construction or
reconstruction of impervious area and do not alter hydrology from pre- to post-development
conditions.
• Temporary access roads, median crossovers, detour roads, lanes, or other temporary impervious
areas that will be restored to pre-construction conditions once the construction activity is complete
(in this context, “temporary” means the impervious area will be in place for two years or less)
• Other construction activities that do not include the construction or reconstruction of impervious
area, and do not alter hydrology from pre- to post-development conditions, and are not listed in
Table 2.
1. If the site is redeveloped in the future, a new eNOI must be submitted.
65
Page 936 of 1174
Page 937
Appendix B
Table 2
CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP THAT INCLUDES
POST-CONSTRUCTION STORMWATER MANAGEMENT PRACTICES (SMPS)
The following construction activities:
• Single-family home located in one of the watersheds listed in Appendix C or directly discharging to
one of the 303(d) segments listed in Appendix D
• Single-family home that disturbs five (5) or more acres of land
• Single-family residential subdivisions located in one of the watersheds listed in Appendix C or
directly discharging to one of the 303(d) segments listed in Appendix D
• Single-family residential subdivisions that involve soil disturbances of between one (1) and five (5)
acres of land with greater than 25% impervious cover at total site build-out
• Single-family residential subdivisions that involve soil disturbances of between 20,000 square feet
and one (1) acre of land within the municipal boundaries of NYC with greater than 25% impervious
cover at total site build-out
• Single-family residential subdivisions that involve soil disturbances of five (5) or more acres of land,
and single-family residential subdivisions that involve soil disturbances of less than five (5) acres
that are part of a common plan of development or sale that will ultimately disturb five (5) or more
acres of land
• Multi-family residential developments; includes duplexes, townhomes, condominiums, senior
housing complexes, apartment complexes, and mobile home parks
• Creation of 5,000 square feet or more of impervious area in the municipal boundaries of NYC
• Airports
• Amusement parks
• Breweries, cideries, and wineries, including establishments constructed on agricultural land
• Campgrounds
• Cemeteries that include the construction or reconstruction of impervious area (>5% of disturbed
area) or alter the hydrology from pre- to post-development conditions
• Commercial developments
• Churches and other places of worship
• Construction of a barn or other agricultural building (e.g. silo) that involves soil disturbance greater
than five acres.
• Structural agricultural conservation practices as identified in Table II in the “Agricultural Best
Management Practice Systems Catalogue” (dated June 2023) that involves soil disturbance greater
than five acres and include the construction or reconstruction of impervious area or alter hydrology
from pre- to post-development conditions.
• Facility buildings, including ski lodges, restroom buildings, pumphouses, ski lift terminals, and
maintenance and groomer garages
• Institutional development; includes hospitals, prisons, schools and colleges
• Industrial facilities; includes industrial parks
• Landfills; including creation of landfills or capping landfills.
• Municipal facilities; includes highway garages, transfer stations, office buildings, POTWs, water
treatment plants, and water storage tanks
• Golf courses
• Office complexes
66
Page 937 of 1174
Page 938
Appendix B
Table 2 (Continued)
CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP THAT INCLUDES
POST-CONSTRUCTION STORMWATER MANAGEMENT PRACTICES (SMPS)
The following construction activities:
• Permanent laydown yards and equipment storage lots
• Playgrounds that include the construction or reconstruction of impervious area
• Sports complexes
• Racetracks; includes racetracks with earthen (dirt) surfaces
• Road construction or reconstruction, outside the municipal boundaries of NYC
• Road construction within the municipal boundaries of NYC
• Stand-alone road reconstruction, within the municipal boundaries of NYC where the total soil
disturbance from that road reconstruction involves soil disturbance of one (1) acre or more of land
• Parking lot construction or reconstruction (as with all Table 2 bullets, this includes parking lots
constructed as part of the construction activities listed in Table 1, unless a Table 1 bullet specifies
otherwise)
• Athletic fields (natural grass) that include the construction or reconstruction of impervious area
(>5% of disturbed area) or alter the hydrology from pre- to post-development conditions
• Athletic fields with artificial turf
• Permanent access roads, parking areas, substations, compressor stations, and well drilling pads,
surfaced with impervious cover, and constructed as part of an overhead electric transmission line,
wind-power, cell tower, oil or gas well drilling, sewer or water main, ski lift, or other linear utility
project
• Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are part of a
residential, commercial or institutional development
• Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are part of
highway construction or reconstruction
• Solar array field areas on slopes greater than 8% that cannot maintain sheet flow using
management practices identified in the BB or the DM
• Solar array field areas on slopes less than 8% that will alter the hydrology from pre- to post-
development conditions
• Solar array field areas with tables that are not elevated high enough to achieve final stabilization
beneath the tables
• Traditional impervious areas associated with solar development (e.g. roads, buildings,
transformers)
• Utility pads surfaced with impervious cover, including electric vehicle charging stations
• All other construction activities that include the construction or reconstruction of impervious area
or alter the hydrology from pre- to post-development conditions, and are not listed in Table 1
67
Page 938 of 1174
Page 939
Appendix C
APPENDIX C – Watersheds Requiring Enhanced Phosphorus Removal
Watersheds where owners or operators of construction activities identified in
Table 2 of Appendix B must prepare a SWPPP that includes SMPs designed in
conformance with the Enhanced Phosphorus Removal Standards included in the
DM technical standard.
• Entire New York City Watershed located east of the Hudson River – Figure 1
• Onondaga Lake Watershed – Figure 2
• Greenwood Lake Watershed – Figure 3
• Oscawana Lake Watershed – Figure 4
• Kinderhook Lake Watershed – Figure 5
68
Page 939 of 1174
Page 940
Appendix C
Figure 1 - New York City Watershed East of the Hudson
69
Page 940 of 1174
Page 941
Appendix C
Figure 2 - Onondaga Lake Watershed
70
Page 941 of 1174
Page 942
Appendix C
Figure 3 - Greenwood Lake Watershed
71
Page 942 of 1174
Page 943
Appendix C
Figure 4 - Oscawana Lake Watershed
72
Page 943 of 1174
Page 944
Appendix C
Figure 5 - Kinderhook Lake Watershed
73
Page 944 of 1174
Page 945
APPENDIX D – Impaired Waterbodies (by Construction Related Pollutants)
List of waterbodies impaired by pollutants related to construction activity, including turbidity,
silt/sediment, and nutrients (e.g. nitrogen, phosphorus). This list is a subset of “The Final New
York State 2018 Section 303(d) List of Impaired Waters Requiring a TMDL” dated June 2020.
County Waterbody Pollutant
Albany Ann Lee (Shakers) Pond, Stump Pond (1201-0096) Phosphorus
Albany Lawsons Lake (1301-0235) Phosphorus
Allegany Amity Lake, Saunders Pond (0403-0054) Phosphorus
Allegany Andover Pond (0403-0056) Phosphorus
Bronx Reservoir No.1/Lake Isle (1702-0075) Phosphorus
Bronx Van Cortlandt Lake (1702-0008) Phosphorus
Broome Blueberry, Laurel Lakes (1404-0033) Phosphorus
Broome Fly Pond, Deer Lake (1404-0038) Phosphorus
Broome Minor Tribs to Lower Susquehanna (0603-0044) Phosphorus
Broome Whitney Point Lake/Reservoir (0602-0004) Phosphorus
Cattaraugus Allegheny River/Reservoir (0201-0023) Phosphorus
Cattaraugus Beaver Lake/Alma Pond (0201-0073) Phosphorus
Cattaraugus Case Lake (0201-0020) Phosphorus
Cattaraugus Linlyco/Club Pond (0201-0035) Phosphorus
Cayuga Duck Lake (0704-0025) Phosphorus
Cayuga Owasco Inlet, Upper, and tribs (0706-0014) Nutrients
Chautauqua Chadakoin River and tribs (0202-0018) Phosphorus
Chautauqua Hulburt/Clymer Pond (0202-0079) Phosphorus
Chautauqua Middle Cassadaga Lake (0202-0002) Phosphorus
Clinton Great Chazy River, Lower, Main Stem (1002-0001) Silt/Sediment
Columbia Robinson Pond (1308-0003) Phosphorus
Cortland Dean Pond (0602-0077) Phosphorus
Dutchess Fallkill Creek (1301-0087) Phosphorus
Dutchess Hillside Lake (1304-0001) Phosphorus
Dutchess Wappingers Lake (1305-0001) Phosphorus
Dutchess Wappingers Lake (1305-0001) Silt/Sediment
Erie Beeman Creek and tribs (0102-0030) Phosphorus
Erie Delaware Park Pond (0101-0026) Phosphorus
Erie Ellicott Creek, Lower, and tribs (0102-0018) Phosphorus
Erie Ellicott Creek, Lower, and tribs (0102-0018) Silt/Sediment
Erie Green Lake (0101-0038) Phosphorus
Erie Little Sister Creek, Lower, and tribs (0104-0045) Phosphorus
Erie Murder Creek, Lower, and tribs (0102-0031) Phosphorus
Page 945 of 1174
Page 946
Erie Rush Creek and tribs (0104-0018) Phosphorus
Erie Scajaquada Creek, Lower, and tribs (0101-0023) Phosphorus
Erie Scajaquada Creek, Middle, and tribs (0101-0033) Phosphorus
Erie Scajaquada Creek, Upper, and tribs (0101-0034) Phosphorus
South Branch Smoke Cr, Lower, and tribs
Erie Phosphorus
(0101-0036)
South Branch Smoke Cr, Lower, and tribs
Erie Silt/Sediment
(0101-0036)
Genesee Bigelow Creek and tribs (0402-0016) Phosphorus
Genesee Black Creek, Middle, and minor tribs (0402 0028) Phosphorus
Genesee Black Creek, Upper, and minor tribs (0402-0048) Phosphorus
Genesee Bowen Brook and tribs (0102-0036) Phosphorus
Genesee LeRoy Reservoir (0402-0003) Phosphorus
Genesee Mill Pond (0402-0050) Phosphorus
Genesee Oak Orchard Cr, Upper, and tribs (0301-0014) Phosphorus
Genesee Oatka Creek, Middle, and minor tribs (0402-0031) Phosphorus
Genessee Tonawanda Cr, Middle, Main Stem (0102-0002) Phosphorus
Greene Schoharie Reservoir (1202-0012) Silt/Sediment
Greene Sleepy Hollow Lake (1301-0059) Silt/Sediment
Herkimer Steele Creek tribs (1201-0197) Phosphorus
Herkimer Steele Creek tribs (1201-0197) Silt/Sediment
Kings Hendrix Creek (1701-0006) 18 Nitrogen
Kings Prospect Park Lake (1701-0196) Phosphorus
Lewis Mill Creek/South Branch, and tribs (0801-0200) Nutrients
Livingston Christie Creek and tribs (0402-0060) Phosphorus
Livingston Conesus Lake (0402-0004) Phosphorus
Livingston Mill Creek and minor tribs (0404-0011) Silt/Sediment
Monroe Black Creek, Lower, and minor tribs (0402-0033) Phosphorus
Monroe Buck Pond (0301-0017) Phosphorus
Monroe Cranberry Pond (0301-0016) Phosphorus
Monroe Durand, Eastman Lakes (0302-0037) Phosphorus
Monroe Lake Ontario Shoreline, Western (0301-0069) 9 Phosphorus
Monroe Long Pond (0301-0015) Phosphorus
Monroe Mill Creek and tribs (0302-0025) Phosphorus 2
Monroe Mill Creek/Blue Pond Outlet and tribs (0402-0049) Phosphorus
Monroe Minor Tribs to Irondequoit Bay (0302-0038) Phosphorus
Monroe Rochester Embayment - East (0302-0002) [9] Phosphorus
Monroe Rochester Embayment - West (0301-0068) 9 Phosphorus
Monroe Shipbuilders Creek and tribs (0302-0026) Phosphorus 2
Monroe Thomas Creek/White Brook and tribs (0302-0023) Phosphorus
75
Page 946 of 1174
Page 947
Nassau Bannister Creek/Bay (1701-0380) Nitrogen
Nassau Beaver Lake (1702-0152) Phosphorus
Nassau Browswere Bay (1701-0383) Nitrogen
Nassau Camaans Pond (1701-0052) Phosphorus
Nassau East Meadow Brook, Upper, and tribs (1701-0211) Silt/Sediment
Nassau East Rockaway Channel (1701-0381) Nitrogen
Nassau Glen Cove Creek, Lower, and tribs (1702-0146) Silt/Sediment
Nassau Grant Park Pond (1701-0054) Phosphorus
Nassau Hempstead Bay, Broad Channel (1701-0032) Nitrogen
Nassau Hempstead Lake (1701-0015) Phosphorus
Nassau Hewlett Bay (1701-0382) Nitrogen
Nassau Hog Island Channel (1701-0220) Nitrogen
Nassau Massapequa Creek, Upper, and tribs (1701-0174) Phosphorus
Milburn/Parsonage Creeks, Upp, and tribs (1701-
Nassau Phosphorus
0212)
Nassau Reynolds Channel, East (1701-0215) [12] Nitrogen
Nassau Reynolds Channel, West (1701-0216) 12 Nitrogen
Nassau Tidal Tribs to Hempstead Bay (1701-0218) Nitrogen
Nassau Tribs (fresh) to East Bay (1701-0204) Silt/Sediment
Nassau Tribs (fresh) to East Bay (1701-0204) Phosphorus
Nassau Tribs to Smith Pond/Halls Pond (1701-0221) Phosphorus
Nassau Woodmere Channel (1701-0219) Nitrogen
New York Harlem Meer (1702-0103) Phosphorus
New York The Lake in Central Park (1702-0105) Phosphorus
Niagara Bergholtz Creek and tribs (0101-0004) Phosphorus
Niagara Hyde Park Lake (0101-0030) Phosphorus
Niagara Lake Ontario Shoreline, Western (0301-0053) 9 Phosphorus
Niagara Lake Ontario Shoreline, Western (0301-0072) 9 Phosphorus
Oneida Ballou, Nail Creeks (1201-0203) Phosphorus
Nutrients
Onondaga Ley Creek and tribs (0702-0001) 10
(phosphorus)
Nutrients
Onondaga Minor Tribs to Onondaga Lake (0702-0022) 10
(phosphorus)
Onondaga Minor Tribs to Onondaga Lake (0702-0022) 10 Nitrogen (NH3, NO2)
Nutrients
Onondaga Onondaga Creek, Lower (0702-0023) 10
(phosphorus)
Onondaga Onondaga Creek, Lower, and tribs (0702-0023) Turbidity
Onondaga Onondaga Creek, Middle, and tribs (0702-0004) Turbidity
Onondaga Onondaga Creek, Upper, and tribs (0702-0024) Turbidity
Ontario Great Brook and minor tribs (0704-0034) Phosphorus 2
Ontario Great Brook and minor tribs (0704-0034) Silt/Sediment
76
Page 947 of 1174
Page 948
Ontario Hemlock Lake Outlet and minor tribs (0402-0013) Phosphorus
Ontario Honeoye Lake (0402-0032) Phosphorus
Orange Brown Pond Reservoir (1303-0013) Phosphorus
Orange Lake Washington (1303-0012) Phosphorus
Orange Minor Tribs to Middle Wallkill (1306-0061) Phosphorus
Orange Monhagen Brook and tribs (1306-0074) Phosphorus
Orange Orange Lake (1301-0008) [16] Phosphorus
Orange Quaker Creek and tribs (1306-0025) Phosphorus
Orange Wallkill River, Middle, Main Stem (1306-0038) Phosphorus
Orange Wallkill River, Upper, and Minor tribs (1306-0017) Phosphorus
Orleans Glenvwood Lake (0301-0041) Phosphorus
Orleans Lake Ontario Shoreline, Western (0301-0070) 9 Phosphorus
Orleans Lake Ontario Shoreline, Western (0301-0071) 9 Phosphorus
Nutrients
Oswego Lake Neatahwanta (0701-0018)
(phosphorus)
Oswego Pleasant Lake (0703-0047) Phosphorus
Putnam Lost Lake, Putnam Lake (1302-0053) Phosphorus
Putnam Minor Tribs to Croton Falls Reservoir (1302-0001) Phosphorus
Queens Bergen Basin (1701-0009) 18 Nitrogen
Jamaica Bay, Eastern, and tribs, Queens (1701-
Queens Nitrogen
0005) 18
Queens Kissena Lake (1702-0258) Phosphorus
Queens Meadow Lake (1702-0030) Phosphorus
Queens Shellbank Basin (1701-0001) 18 Nitrogen
Queens Willow Lake (1702-0031) Phosphorus
Rensselaer Nassau Lake (1310-0001) Phosphorus
Rensselaer Snyders Lake (1301-0043) Phosphorus
Richmond Grassmere Lake/Bradys Pond (1701-0357) Phosphorus
Rockland Congers Lake, Swartout Lake (1501-0019) Phosphorus
Rockland Rockland Lake (1501-0021) Phosphorus
Saratoga Ballston Lake (1101-0036) Phosphorus
Saratoga Dwaas Kill and tribs (1101-0007) Phosphorus
Saratoga Dwaas Kill and tribs (1101-0007) Silt/Sediment
Saratoga Lake Lonely (1101-0034) Phosphorus
Saratoga Round Lake (1101-0060) Phosphorus
Saratoga Tribs to Lake Lonely (1101-0001) Phosphorus
Schenectady Collins Lake (1201-0077) Phosphorus
Schenectady Duane Lake (1311-0006) Phosphorus
Schenectady Lake Mariaville Lake (1201-0113) Phosphorus
Schuyler Cayuta Lake (0603-0005) Phosphorus
77
Page 948 of 1174
Page 949
Seneca Reeder Creek and tribs (0705-0074) Phosphorus
St.Lawrence Black Lake Outlet, Black Lake (0906-0001) Phosphorus
St.Lawrence Fish Creek and minor tribs (0906-0026) Phosphorus
Steuben Smith Pond (0502-0012) Phosphorus
Suffolk Agawam Lake (1701-0117) Phosphorus
Suffolk Big/Little Fresh Ponds (1701-0125) Phosphorus
Suffolk Canaan Lake (1701-0018) Phosphorus
Suffolk Canaan Lake (1701-0018) Silt/Sediment
Suffolk Fresh Pond (1701-0241) Phosphorus
Suffolk Great South Bay, East (1701-0039) Nitrogen
Suffolk Great South Bay, Middle (1701-0040) Nitrogen
Suffolk Great South Bay, West (1701-0173) Nitrogen
Suffolk Lake Ronkonkoma (1701-0020) Phosphorus
Suffolk Mattituck/Marratooka Pond (1701-0129) Phosphorus
Suffolk Mill and Seven Ponds (1701-0113) Phosphorus
Suffolk Millers Pond (1702-0013) Phosphorus
Suffolk Moriches Bay, East (1701-0305) Nitrogen
Suffolk Moriches Bay, West (1701-0038) Nitrogen
Suffolk Quantuck Bay (1701-0042) Nitrogen
Suffolk Shinnecock Bay and Inlet (1701-0033) Nitrogen
Suffolk Tidal Tribs to West Moriches Bay (1701-0312) Nitrogen
Sullivan Bodine, Mongomery Lakes (1401-0091) Phosphorus
Sullivan Davies Lake (1402-0047) Phosphorus
Sullivan Evens Lake (1402-0004) Phosphorus
Sullivan Pleasure Lake (1402-0055) Phosphorus
Sullivan Swan Lake (1401-0063) Phosphorus
Tompkins Cayuga Lake, Southern End (0705-0040) Phosphorus
Tompkins Cayuga Lake, Southern End (0705-0040) Silt/Sediment
Ulster Ashokan Reservoir (1307-0004) Silt/Sediment
Ulster Esopus Creek, Lower, Main Stem (1307-0010) [17] Turbidity
Ulster Esopus Creek, Middle, Main Stem (1307-0003) 17 Turbidity
Esopus Creek, Upper, and minor tribs
Ulster Silt/Sediment
(1307-0007)[3]
Ulster Wallkill River, Lower, Main Stem (1306-0027) Phosphorus
Warren Hague Brook and tribs (1006-0006) Silt/Sediment
Warren Huddle/Finkle Brooks and tribs (1006-0003) Silt/Sediment
Warren Indian Brook and tribs (1006-0002) Silt/Sediment
Warren Lake George (1006-0016) and tribs Silt/Sediment
Warren Tribs to Lake George, East Shore (1006-0020) Silt/Sediment
Warren Tribs to Lake George, Lk.George Village (1006-0008) Silt/Sediment
78
Page 949 of 1174
Page 950
Washington Wood Cr/Champlain Canal and tribs (1005-0036) Phosphorus
Westchester Lake Katonah (1302-0136) Phosphorus
Westchester Lake Lincolndale (1302-0089) Phosphorus
Westchester Lake Meahagh (1301-0053) Phosphorus
Westchester Lake Mohegan (1301-0149) Phosphorus
Westchester Lake Shenorock (1302-0083) Phosphorus
Westchester Mamaroneck River, Lower (1702-0071) Silt/Sediment
Westchester Mamaroneck River, Upp, & minor tribs (1702-0123) Silt/Sediment
Westchester Saw Mill River (1301-0007) Phosphorus
Westchester Saw Mill River, Middle, and tribs (1301-0100) Phosphorus
Westchester Sheldrake River (1702-0069) Phosphorus
Westchester Sheldrake River (1702-0069) Silt/Sedimnt
Westchester Silver Lake (1702-0040) Phosphorus
Westchester Teatown Lake (1302-0150) Phosphorus
Westchester Truesdale Lake (1302-0054) Phosphorus
Westchester Wallace Pond (1301-0140) Phosphorus
79
Page 950 of 1174
Page 951
APPENDIX E – List of NYSDEC Regional Offices
DIVISION OF DIVISION OF WATER
COVERING THE ENVIRONMENTAL
Region (DOW)
FOLLOWING COUNTIES: PERMITS (DEP) WATER (SPDES) PROGRAM
PERMIT ADMINISTRATORS
50 CIRCLE ROAD 50 CIRCLE ROAD
1 NASSAU AND SUFFOLK STONY BROOK, NY 11790 STONY BROOK, NY 11790-3409
TEL. (631) 444-0365 TEL. (631) 444-0405
1 HUNTERS POINT PLAZA, 1 HUNTERS POINT PLAZA,
BRONX, KINGS, NEW YORK, 47-40 21ST ST. 47-40 21ST ST.
2 QUEENS AND RICHMOND LONG ISLAND CITY, NY 11101-5407 LONG ISLAND CITY, NY 11101-5407
TEL. (718) 482-4997 TEL. (718) 482-4933
DUTCHESS, ORANGE, PUTNAM, 21 SOUTH PUTT CORNERS ROAD
220 WHITE PLAINS ROAD, SUITE 110
3 ROCKLAND, SULLIVAN, ULSTER NEW PALTZ, NY 12561-1696
TEL. (914) 428 - 2505
AND WESTCHESTER TEL. (845) 256-3059
ALBANY, COLUMBIA,
DELAWARE, GREENE, 1130 NORTH WESTCOTT ROAD 1130 NORTH WESTCOTT ROAD
4 MONTGOMERY, OTSEGO, SCHENECTADY, NY 12306-2014 SCHENECTADY, NY 12306-2014
RENSSELAER, SCHENECTADY TEL. (518) 357-2069 TEL. (518) 357-2045
AND SCHOHARIE
CLINTON, ESSEX, FRANKLIN,
1115 STATE ROUTE 86, PO BOX 296 232 GOLF COURSE ROAD
FULTON, HAMILTON,
5 SARATOGA, WARREN AND
RAY BROOK, NY 12977-0296 WARRENSBURG, NY 12885-1172
TEL. (518) 897-1234 TEL. (518) 623-1200
WASHINGTON
STATE OFFICE BUILDING STATE OFFICE BUILDING
HERKIMER, JEFFERSON,
317 WASHINGTON STREET 207 GENESEE STREET
6 LEWIS, ONEIDA AND
WATERTOWN, NY 13601-3787 UTICA, NY 13501-2885
ST. LAWRENCE
TEL. (315) 785-2245 TEL. (315) 793-2554
BROOME, CAYUGA,
CHENANGO, CORTLAND, 5786 WIDEWATERS PARKWAY 5786 WIDEWATERS PARKWAY
7 MADISON, ONONDAGA, SYRACUSE, NY 13214-1867 SYRACUSE, NY 13214-1867
OSWEGO, TIOGA AND TEL. (315) 426-7438 TEL. (315) 426-7500
TOMPKINS
CHEMUNG, GENESEE,
LIVINGSTON, MONROE, 6274 EAST AVON-LIMA 6274 EAST AVON-LIMA RD.
ONTARIO, ORLEANS,
8 SCHUYLER, SENECA,
ROADAVON, NY 14414-9519 AVON, NY 14414-9519
TEL. (585) 226-2466 TEL. (585) 226-2466
STEUBEN, WAYNE AND
YATES
ALLEGANY,
700 DELAWARE AVENUE 700 DELAWARE AVENUE
CATTARAUGUS,
9 CHAUTAUQUA, ERIE,
BUFFALO, NY 14209-2999 BUFFALO, NY 14209-2999
TEL. (716) 851-7165 TEL. (716) 851-7070
NIAGARA AND WYOMING
80
Page 951 of 1174
Page 952
Appendix E
Forms
Page 952 of 1174
Page 953
Page 953 of 1174
Page 954
STORM WATER POLLUTION PREVENTION PLAN
CONTRACTOR’S CERTIFICATION STATEMENT
West Seneca Exchange
CONTRACTOR'S CERTIFICATION:
“I certify under penalty of law that I understand and agree to comply with the terms and conditions of the SWPPP
for the construction site identified in such SWPPP as a condition of authorization to discharge storm water. I also
understand that the operator must comply with the terms and conditions of the New York State Pollutant
Discharge Elimination System (SPDES) general permit for storm water discharges from construction activities and
that it is unlawful for any person to cause or contribute to a violation of water quality standards.”
Note: The contractor shall have at least one NYSDEC trained individual onsite at all times when earthwork and
other SWPPP associated work is being performed from each contractor(s) and subcontractor(s). Each contractor(s)
and subcontractor(s) shall provide copies of these individuals’ certifications to the Town of West Seneca.
Name:
(Print)
Signature:
Title:
Company Name:
Address: ___________________________________
Telephone Number: __________________________
Date: ______________________________________
Scope of Services:
Trained Individual(s) Responsible for Implementation: __________________________________________
This form must be signed by a responsible corporate officer or other party meeting the
“Signatory Requirements” of the NYSDEC SPDES General Permit
Page 954 of 1174
Page 955
Page 955 of 1174
Page 956
Page 956 of 1174
Page 957
Page 957 of 1174
Page 958
Appendix F
NYSDEC Notice of Termination (NOT)
Page 958 of 1174
Page 959
Page 959 of 1174
Page 960
New York State Department of Environmental Conservation
Division of Water
625 Broadway, 4th Floor
Albany, New York 12233-3505
*(NOTE: Submit completed form to address above)*
NOTICE OF TERMINATION for Storm Water Discharges Authorized
under the SPDES General Permit for Construction Activity
Please indicate your permit identification number: NYR ___ ___ ___ ___ ___ ___
I. Owner or Operator Information
1. Owner/Operator Name:
2. Street Address:
3. City/State/Zip:
4. Contact Person: 4a.Telephone:
4b. Contact Person E-Mail:
II. Project Site Information
5. Project/Site Name:
6. Street Address:
7. City/Zip:
8. County:
III. Reason for Termination
9a. □ All disturbed areas have achieved final stabilization in accordance with the general permit and
SWPPP. *Date final stabilization completed (month/year):
9b. □ Permit coverage has been transferred to new owner/operator. Indicate new owner/operator’s
permit identification number: NYR ___ ___ ___ ___ ___ ___
(Note: Permit coverage can not be terminated by owner identified in I.1. above until new
owner/operator obtains coverage under the general permit)
9c. □ Other (Explain on Page 2)
IV. Final Site Information:
10a. Did this construction activity require the development of a SWPPP that includes post-construction
stormwater management practices? □ yes □ no ( If no, go to question 10f.)
10b. Have all post-construction stormwater management practices included in the final SWPPP been
constructed? □ yes □ no (If no, explain on Page 2)
10c. Identify the entity responsible for long-term operation and maintenance of practice(s)?
Page 1 of 3
Page 960 of 1174
Page 961
NOTICE OF TERMINATION for Storm Water Discharges Authorized under the
SPDES General Permit for Construction Activity - continued
10d. Has the entity responsible for long-term operation and maintenance been given a copy of the
operation and maintenance plan required by the general permit? □ yes □ no
10e. Indicate the method used to ensure long-term operation and maintenance of the post-construction
stormwater management practice(s):
□ Post-construction stormwater management practice(s) and any right-of-way(s) needed to
maintain practice(s) have been deeded to the municipality.
□ Executed maintenance agreement is in place with the municipality that will maintain the
post-construction stormwater management practice(s).
□ For post-construction stormwater management practices that are privately owned, a mechanism
is in place that requires operation and maintenance of the practice(s) in accordance with the operation
and maintenance plan, such as a deed covenant in the owner or operator’s deed of record.
□ For post-construction stormwater management practices that are owned by a public or private
institution (e.g. school, university or hospital), government agency or authority, or public utility; policy and
procedures are in place that ensures operation and maintenance of the practice(s) in accordance with the
operation and maintenance plan.
10f. Provide the total area of impervious surface (i.e. roof, pavement, concrete, gravel, etc.) constructed
within the disturbance area?
(acres)
11. Is this project subject to the requirements of a regulated, traditional land use control MS4? □ yes
□ no
(If Yes, complete section VI - “MS4 Acceptance” statement
V. Additional Information/Explanation:
(Use this section to answer questions 9c. and 10b., if applicable)
VI. MS4 Acceptance - MS4 Official (principal executive officer or ranking elected official) or Duly
Authorized Representative (Note: Not required when 9b. is checked -transfer of coverage)
I have determined that it is acceptable for the owner or operator of the construction project identified in
question 5 to submit the Notice of Termination at this time.
Printed Name:
Title/Position:
Signature: Date:
Page 2 of 3
Page 961 of 1174
Page 962
NOTICE OF TERMINATION for Storm Water Discharges Authorized under the
SPDES General Permit for Construction Activity - continued
VII. Qualified Inspector Certification - Final Stabilization:
I hereby certify that all disturbed areas have achieved final stabilization as defined in the current version
of the general permit, and that all temporary, structural erosion and sediment control measures have
been removed. Furthermore, I understand that certifying false, incorrect or inaccurate information is a
violation of the referenced permit and the laws of the State of New York and could subject me to
criminal, civil and/or administrative proceedings.
Printed Name:
Title/Position:
Signature: Date:
VIII. Qualified Inspector Certification - Post-construction Stormwater Management Practice(s):
I hereby certify that all post-construction stormwater management practices have been constructed in
conformance with the SWPPP. Furthermore, I understand that certifying false, incorrect or inaccurate
information is a violation of the referenced permit and the laws of the State of New York and could
subject me to criminal, civil and/or administrative proceedings.
Printed Name:
Title/Position:
Signature: Date:
IX. Owner or Operator Certification
I hereby certify that this document was prepared by me or under my direction or supervision. My
determination, based upon my inquiry of the person(s) who managed the construction activity, or those
persons directly responsible for gathering the information, is that the information provided in this
document is true, accurate and complete. Furthermore, I understand that certifying false, incorrect or
inaccurate information is a violation of the referenced permit and the laws of the State of New York and
could subject me to criminal, civil and/or administrative proceedings.
Printed Name:
Title/Position:
Signature: Date:
(NYS DEC Notice of Termination - January 2015)
Page 3 of 3
Page 962 of 1174
Page 963
Page 963 of 1174
Page 964
Appendix G
Construction Documents
Page 964 of 1174
Page 965
Page 965 of 1174
Page 966
Page 966 of 1174
Page 967
Page 967 of 1174
Page 968
Page 968 of 1174
Page 969
Page 969 of 1174
Page 970
Page 970 of 1174
Page 971
Page 971 of 1174
Page 972
Page 972 of 1174
Page 973
Page 973 of 1174
Page 974
Page 974 of 1174
Page 975
Page 975 of 1174
Page 976
Page 976 of 1174
Page 977
Page 977 of 1174
Page 978
Page 978 of 1174
Page 979
Page 979 of 1174
Page 980
Page 980 of 1174
Page 981
Page 981 of 1174
Page 982
Page 982 of 1174
Page 983
Page 983 of 1174
Page 984
Page 984 of 1174
Page 985
Page 985 of 1174
Page 986
Page 986 of 1174
Page 987
Page 987 of 1174
Page 988
Page 988 of 1174
Page 989
Page 989 of 1174
Page 990
Page 990 of 1174
Page 991
Page 991 of 1174
Page 992
Page 992 of 1174
Page 993
Page 993 of 1174
Page 994
Page 994 of 1174
Page 995
Page 995 of 1174
Page 996
Page 996 of 1174
Page 997
Page 997 of 1174
Page 998
Page 998 of 1174
Page 999
Page 999 of 1174
Page 1000
Page 1000 of 1174
Page 1001
Page 1001 of 1174
Page 1002
Page 1002 of 1174
Page 1003
Page 1003 of 1174
Page 1004
Page 1004 of 1174
Page 1005
Page 1005 of 1174
Page 1006
Appendix H
Soils Information
Page 1006 of 1174
Page 1007
Page 1007 of 1174
Page 1008
Hydrologic Soil Group—Erie County, New York
78° 47' 23'' W
78° 46' 54'' W
680700 680800 680900 681000 681100 681200
42° 50' 9'' N 42° 50' 9'' N
4744900
4744900
4744800
4744800
4744700
4744700
4744600
4744600
4744500
4744500
4744400
4744400
4744300
4744300
4744200
4744200
Soil Map may not be valid at this scale.
4744100
42° 49' 40'' N 42° 49' 40'' N
680700 680800 680900 681000 681100 681200
78° 47' 23'' W
78° 46' 54'' W
Map Scale: 1:4,240 if printed on A portrait (8.5" x 11") sheet.
Meters
N 0 50 100 200 300
Feet
0 200 400 800 1200
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84
Natural Resources Web Soil Survey 11/27/2024
Conservation Service National Cooperative Soil Survey Page 1 of 4
Page 1008 of 1174
Page 1009
Hydrologic Soil Group—Erie County, New York
MAP LEGEND MAP INFORMATION
Area of Interest (AOI) C The soil surveys that comprise your AOI were mapped at
Area of Interest (AOI) 1:15,800.
C/D
Soils Warning: Soil Map may not be valid at this scale.
D
Soil Rating Polygons
Not rated or not available Enlargement of maps beyond the scale of mapping can cause
A
misunderstanding of the detail of mapping and accuracy of soil
A/D Water Features line placement. The maps do not show the small areas of
Streams and Canals contrasting soils that could have been shown at a more detailed
B scale.
Transportation
B/D
Rails Please rely on the bar scale on each map sheet for map
C measurements.
Interstate Highways
C/D Source of Map: Natural Resources Conservation Service
US Routes
D
Web Soil Survey URL:
Major Roads Coordinate System: Web Mercator (EPSG:3857)
Not rated or not available
Local Roads Maps from the Web Soil Survey are based on the Web Mercator
Soil Rating Lines projection, which preserves direction and shape but distorts
Background
A distance and area. A projection that preserves area, such as the
Aerial Photography
Albers equal-area conic projection, should be used if more
A/D accurate calculations of distance or area are required.
B This product is generated from the USDA-NRCS certified data as
B/D
of the version date(s) listed below.
C Soil Survey Area: Erie County, New York
Survey Area Data: Version 24, Aug 25, 2024
C/D
Soil map units are labeled (as space allows) for map scales
D 1:50,000 or larger.
Not rated or not available Date(s) aerial images were photographed: May 13, 2023—May
27, 2023
Soil Rating Points
A The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
A/D imagery displayed on these maps. As a result, some minor
B shifting of map unit boundaries may be evident.
B/D
Natural Resources Web Soil Survey 11/27/2024
Conservation Service National Cooperative Soil Survey Page 2 of 4
Page 1009 of 1174
Page 1010
Hydrologic Soil Group—Erie County, New York
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
CsB Collamer silt loam, 3 to C/D 0.0 0.0%
8 percent slopes
Hm Hamlin silt loam B 0.6 0.9%
NfA Niagara silt loam, 0 to 3 C/D 4.3 7.3%
percent slopes
RgA Rhinebeck silt loam, 0 to C/D 0.6 1.1%
3 percent slopes
RkA Rhinebeck gravelly C/D 1.7 2.8%
loam, 0 to 3 percent
slopes
Te Teel silt loam B/D 0.1 0.2%
Uc Udorthents, smoothed 1.5 2.6%
Ud Urban land 49.7 85.0%
Totals for Area of Interest 58.5 100.0%
Natural Resources Web Soil Survey 11/27/2024
Conservation Service National Cooperative Soil Survey Page 3 of 4
Page 1010 of 1174
Page 1011
Hydrologic Soil Group—Erie County, New York
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Natural Resources Web Soil Survey 11/27/2024
Conservation Service National Cooperative Soil Survey Page 4 of 4
Page 1011 of 1174
Page 1012
Appendix I
Standard Erosion Control Details
Page 1012 of 1174
Page 1013
Page 1013 of 1174
Page 1014
Page 1014 of 1174
Page 1015
Page 1015 of 1174
Page 1016
Page 1016 of 1174
Page 1017
MIN. SIZE 8"
MIN. SIZE 8"
MIN. SIZE 8"
THE MINIMUM SIZE OF THE SILT SOCK SHALL BE 8".
Page 1017 of 1174
Page 1018
Page 1018 of 1174
Page 1019
Page 1019 of 1174
Page 1020
Page 1020 of 1174
Page 1021
Page 1021 of 1174
Page 1022
Appendix J
NYSDEC Stormwater Management Inspection Lists
Page 1022 of 1174
Page 1023
Page 1023 of 1174
Page 1024
2.10. Ponds and Wetlands
Areas of Ponds and Wetlands
Key areas to inspect for ponds and wetlands include the following:
PO 1. Drainage area
PO 2. Inlet pipes and swales
PO 3. Pond area and embankments
PO 4. Pond outlet
Note: This category includes the following practices:
Wet ponds – have a permanent pool of water and may be divided into various “cells”
Stormwater wetlands – have a variety of depth zones ranging from deep pools to shallow wetlands and are
characterized by wetland vegetation
It is recommended strongly to have as-built drawings and copies of previous inspections at hand, if available. Aerial
photos may be needed to help direct the inspector to the pond or wetland location if it is obscured by vegetation.
Figure 2.10.1. Key Areas for Level 1 Inspection of a Pond/Wetland
Maintenance Guidance 35
Page 1024 of 1174
Page 1025
Pond and Wetland Level 1 Inspection
The Level 1 Inspection focuses on the drainage area (PW 1), inlet pipes or swales (PW 2), pond area and embankments
(PW 3) and pond outlet structures and outfall (PW 4). This inspection should be conducted on a regular basis to ensure
that a buildup of trash, vegetation, or sediment does not interfere with the pre-treatment, pond or wetland, and the outfall’s
normal flow or function. Pond embankments and dams should be regularly inspected for evidence of erosion, burrowing or
tunneling animals, and large woody vegetation growing on the dam.
PW 1. Drainage Area
Description: The drainage area conveys runoff to and is uphill from the pond inlet. When it rains, water runs off through
roof drains, yard drains, parking lots, roadways and underdrains to the ponds. Flow is through underground piping
systems, overland via swales, or across the ground as sheetflow. Sometimes, the runoff will contain dirt, grit, grass
clippings, leaves and woody debris that can collect in the drainage system. If left alone, blockages can occur and increase
the chance of shallow flooding or standing water. Standing water in drainage systems foster mosquitos, pipe corrosion,
and possible nuisance and odor conditions.
Instruction: Look for areas that are uphill from the pond. Consult Table 2.10.1 below:
Table 2.10.1 PW Drainage Area
Problem (Check if Present) Follow-Up Actions
Seed and straw areas of bare soil to establish vegetation.
Fill in eroded areas with soil, compact, seed and mulch with
straw to establish vegetation.
Other:
Kick-Out to Level 2 Inspection: If a rill or small channel is
Bare soil, erosion of the ground (rills washing out the dirt) forming, try to redirect water flowing to this area by creating
a small berm or adding topsoil to areas that are
heavily compacted.
If large areas of soil have been eroded or larger channels are
forming, this may require rerouting of flow paths or use of an
erosion-control seed mat or blanket to reestablish acceptable
ground cover or anchor sod where it is practical.
Piles of grass Remove or cover piles of grass clippings, mulch, dirt, etc.
clippings, mulch, Remove excessive vegetation or woody debris that can block
dirt, salt, or drainage systems.
other materials Other:
Open containers
of oil, grease, Cover or properly dispose of materials; consult your local
paint, or other solid waste authority for guidance on materials that may be
substances toxic or hazardous.
exposed to rain
in the drainage Other:
area
Maintenance Guidance 36
Page 1025 of 1174
Page 1026
PW 2. Pond Inlets
Description: Free, unobstructed flow from the drainage area to stormwater ponds is necessary to prevent shallow flooding
and even structural damage from flooding. Pond inlets can consist of pipes, ditches, swales, or other means to convey
stormwater to the pond or wetland.
Instruction: Look for all areas where water flows into the pond during storms. Note that there may be multiple points of
inflow and types of structures (e.g., pipes, open ditches, etc.). Consult Table 2.10.2 below:
Table 2.10.2 Pond Inlets
Problem (Check if Present) Follow-Up Actions
If the problem can be remedied with hand tools
and done in a safe manner, remove
vegetation, trash, woody debris, etc. from
blocking inlet structures.
Other:
Inlets are buried,
covered or filled with
silt, debris, or trash, or
blocked by excessive
vegetation.
Kick-Out to Level 2 or 3 Inspection: If the
amount of material is too large to handle OR
there are ANY safety concerns about working
in standing water, soft sediment, etc., the work
will likely have to be performed by a
qualified contractor.
Inlets are broken, and,
with pieces of pipe or
concrete falling into the
Kick-Out to Level 2 Inspection: These types of
pond, there is erosion
structural or erosion problems are more
around the inlet, there is
serious and will require a qualified contractor
open space under the
to repair.
pipe, or there is erosion
where the inlet meets
the pond
Maintenance Guidance 37
Page 1026 of 1174
Page 1027
PW 3. Pond Area and Embankments
Description: The pond area and embankment can consist of the following elements:
Pre-treatment cell or small holding area where water first flows into the pond from the various inlets. These are
commonly referred to as “forebays” and will be demarcated from the main pond area by small dams made of
earth or rock. The purpose of forebays is to capture some of the sediment and pollutants before they reach the
deep pool, making maintenance easier over time. Not all ponds will have forebays.
The pond surface can be open water or a combination of open water and areas with wetland vegetation.
Sometimes there is a shallow bench around the perimeter of a pond, known as an “aquatic bench.”
The “side slopes” are areas around the perimeter of the pond where the surrounding land slopes down to the
pond surface.
Most ponds will have a “riser structure,” where the water exits a pond during storms. This can be a concrete or
metal pipe that is open at the top, often with some type of trash rack. Some ponds also have an “emergency
spillway,” which is an open, rock-lined channel that carries water from large storms safely across the
embankment.
The dam or embankment holds water in the pond and is constructed of compacted soil, such as clay. There is
often a pipe through the embankment that carries water from the riser structure safely through the embankment to
the downstream channel.
The pond’s pre-treatment areas or forebays should not be choked with vegetation or full of sediment. Removal of
excessive vegetation and sediment and selective replanting are often annual maintenance activities.
Likewise, the pond’s deep pool should not to be choked with vegetation or filled with sediment. Vegetation and sediment
bars can restrict flow and cause short circuiting that reduces capture of sediment. Pond volume is to be maintained at the
original design capacity and free of sediment bars or debris piles. Sometimes ponds are over-maintained and have no
vegetation. Algae and turbidity (muddy water) are common problems in many ponds.
Instruction: Examine both interior and exterior pond banks as well as the pond body. Observe from the inlet pipes to the
outfall structure and emergency overflow.
Table 2.10.3 PW Pond Area and Embankments
Problem (Check if Present) Follow-Up Actions
If the problem can be remedied with hand tools
and done in a safe manner, use a flat shovel or
other equipment to remove small amounts
of sediment.
Remove trash and excessive vegetation from
The pretreatment forebays if this can be done in a safe manner.
area(s) or forebay(s) Other:
are filled with
sediment, trash,
vegetation, or
other debris.
Kick-Out to Level 2 Inspection: Large amounts of
sediment or debris will have to be removed by a
qualified contractor. ANY condition that poses a
safety concern for working in standing water or
soft sediments should be referred to a Level 2
Inspection or qualified contractor.
Maintenance Guidance 38
Page 1027 of 1174
Page 1028
Table 2.10.3 PW Pond Area and Embankments
Problem (Check if Present) Follow-Up Actions
Level 1 includes handling only small amounts of
material that can be removed by hand, or with
rakes or other hand tools. Do not attempt any
The pond area itself repair that poses a safety issue.
has accumulated
Other:
sediment, trash,
debris, or excessive
vegetation that is
choking the flow of Kick-Out to Level 2 Inspection: Most cases
the water, OR the will call for a Level 2 Inspection and/or a
pond area is covered qualified contractor.
with algae or You are not sure what type and amount of
aquatic plants. vegetation is supposed to be in the pond.
The algae or aquatic plants should be identified
so that proper control techniques can be applied.
If there are only minor areas, try filling in small
rills or gullies with topsoil, compacting, and
seeding and mulching all bare dirt areas with an
appropriate seed. Alternatively, try using
herbaceous plugs to get vegetation established in
The side slopes of tricky areas, such as steep slopes.
the pond are
unstable, eroding, Other:
and have areas of
bare dirt.
Kick-Out to Level 2 Inspection: Erosion and
many bare dirt areas on steep side slopes will
require a Level 2 Inspection and repair by a
qualified contractor.
If you can safely access the riser on foot or with a
small boat, clear minor amounts of debris and
remove it from the pond area for safe disposal.
Other:
The riser structure is
clogged with trash,
debris, sediment,
vegetation, etc., OR
is open, unlocked, or
has a steep drop and
poses a safety
concern. The pond Kick-Out to Level 2 Inspection: The riser cannot
level may have be accessed safely, the amount of debris is
dropped below its substantial, or the riser seems to be completely
“normal” level. clogged and the water level has risen too high.
There are safety issues with the riser and concern
about access to pipes, drops, or any other life
safety concern.
The riser is leaning, broken, settling or slumping,
corroded, eroded or any other structural problem.
Maintenance Guidance 39
Page 1028 of 1174
Page 1029
Table 2.10.3 PW Pond Area and Embankments
Problem (Check if Present) Follow-Up Actions
If there are small isolated areas, try to fix them by
adding clean material (clay and topsoil) and
seeding and mulching.
Periodically mow embankments to enable
inspection of the banks and to minimize
establishment of woody vegetation.
The Remove any woody vegetation that has already
dam/embankment is established on embankments.
slumping, sinking, Other:
settling, eroding, or
has medium or large
trees growing on it. Kick-Out to Level 2 Inspection: Most of these
situations will require a Level 2 Inspection or
evaluation and repair by a qualified contractor.
Seepage through the dam or problems with the
pipe through the dam can be a serious issue
that should be addressed to avoid possible
dam failure.
Clear light debris and vegetation.
Other:
The emergency Kick-Out to Level 2 Inspection: Displacement of
spillway or outfall (if it rock lining, excessive vegetation and
exists) has erosion/settlement may warrant review and
erosion, settlement, decision by Level 2 Inspector to check against
or loss of material. original plan.
Rock-lined spillways Any uncertainty about the integrity of the
have excessive emergency spillway should be referred to a
debris or vegetation. Level 2 Inspector.
Erosion or settlement such that design has
been compromised should be reviewed by
an engineer.
Maintenance Guidance 40
Page 1029 of 1174
Page 1030
PW 4. Pond Outlet
Description: The pond’s outlet enables the ponded water to discharge to downstream drainage systems or stream
channels. The outlet is often at the base of the dam/embankment on the downstream side. Inspection of this point can
help prevent flooding of the pond and upstream drainage systems and prevent pond failure at a weak point of a pond’s
containment system.
Instruction: Examine the outlet of the pipe on the downstream side of the dam/embankment where it empties into a
stream, channel, or drainage system. Consult the table below for possible problems.
Table 2.10.4 PW Pond Outlet
Problem (Check if Present) Follow-Up Actions
If there is a minor blockage, remove the debris or vegetation
to allow free flow of water.
Remove any accumulated trash at the outlet.
Outlet:
Kick-Out to Level 2 Inspection:
If the area at the outlet cannot be easily accessed or if the
blockage is substantial, a Level 2 Inspection is warranted.
Erosion at and downstream of the outfall should be
evaluated by a qualified professional.
Any structural problems, such as broken pipes, structures
falling into the stream, or holes or tunnels around the outfall
pipe, should be evaluated by a Level 2 Inspector and will
require repair by a qualified contractor.
The pond outlet is clogged with sediment, trash, The pool of water at the outlet pipe is discolored, has an
debris, vegetation, or is eroding, caving in, slumping, odor, or has excessive algae or vegetative growth.
or falling apart.
2.11. Infiltration
Areas of Infiltration
Key areas to inspect for Infiltration include
the following:
IN 1. Drainage Area
IN 2. Inlets
IN 3. Infiltration Area
IN 4. Outlets
Note: The category of Infiltration includes:
Infiltration Trench – Long, narrow
infiltration practice, usually with small
gravel at the surface and a reservoir
of larger gravel or stone beneath
Infiltration Basin – Larger practice,
usually covered with grass and Figure 2.11.1 Key Areas for Level 1 Inspection of Infiltration Practice
highly permeable soil beneath
Dry Well – Small pit filled with stone or gravel, or precast concrete chamber surrounded by stone that receives
and stores runoff to enable it to infiltrate into the underlying ground.
Maintenance Guidance 41
Page 1030 of 1174
Page 1031
Page 1031 of 1174
Page 1032
Appendix K
SHPO Clearance Letter
Page 1032 of 1174
Page 1033
Page 1033 of 1174
Page 1034
KATHY HOCHUL RANDY SIMONS
Governor Commissioner Pro Tempore
February 10, 2025
Jeffrey Schieber
Town of West Seneca
1250 Union Road
West Seneca, NY 14224
Re: DEC
Seneca Mall Redevelopment
355 Orchard Park Rd, West Seneca, NY 14224
25PR01131
Dear Jeffrey Schieber:
Thank you for requesting the comments of the Office of Parks, Recreation and Historic
Preservation (OPRHP). We have reviewed the project in accordance with the New York State
Historic Preservation Act of 1980 (Section 14.09 of the New York Parks, Recreation and Historic
Preservation Law). These comments are those of the OPRHP and relate only to Historic/Cultural
resources. They do not include potential environmental impacts to New York State Parkland that
may be involved in or near your project.
Based upon this review, it is the opinion of OPRHP that no properties, including archaeological
and/or historic resources, listed in or eligible for the New York State and National Registers of
Historic Places will be impacted by this project.
If further correspondence is required regarding this project, please be sure to refer to the
OPRHP Project Review (PR) number noted above. If you have any questions, please contact
Sydney Snyder at the following email address:
[email protected]
Sincerely,
R. Daniel Mackay
Deputy Commissioner for Historic Preservation
Division for Historic Preservation
New York State Office of Parks, Recreation and Historic Preservation
Division for Historic Preservation, Peebles Island, PO Box 189, Waterford, New York 12188-0189
(518) 237-8643 • https://parks.ny.gov/shpo
Page 1034 of 1174
Page 1035
Page 1035 of 1174
Page 1036
Appendix L
NYSDEC Environmental Resource Mapper
Page 1036 of 1174
Page 1037
Page 1037 of 1174
Page 1038
West Seneca Exchange Wetland Mapper
PROJECT
LOCATION
June 24, 2026 1:18,056
0 0.15 0.3 0.6 mi
0 0.25 0.5 1 km
Province of Ontario, Ontario MNR, Esri Canada, Esri, HERE,
Garmin, INCREMENT P, USGS, METI/NASA, EPA, USDA
NYS Department of Environmental Conservation
Page
Not 1038
a legal of 1174
document
Page 1039
West Seneca Exchange
Slade Ave, Ridge Road, & Orchard Park Road
West Seneca, New York
UTILITIES
AGENCIES OWNER/DEVELOPER
Name: Benchmark Streamline
Address: 4053 Maple Road
Amherst, NY 14226
Telephone: (716) 833-4986
PROJECT
LOCATION
REVISIONS:
No. Description Date
LOCATION MAP
NOT TO SCALE
DESIGN CONSULTANTS
July 2026 West Seneca Exchange
Slade Ave, Ridge Road, & Orchard Park Road
West Seneca, New York
Page 1039 of 1174
Page 1040
Page 1040 of 1174
Page 1041
GV
GV
GV
GV
GV
STOP S
TOP
STOP
STOP
STOP
GV
STOP
THIS SURVEY IS NOT VALID WITH AN AFFIDAVIT OF NO CHANGE NO IRONS SET OR FOUND AT PROPERTY CORNERS UNLESS NOTED HEREON.
Unauthorized alterations or additions to any survey, drawing,
3556 Lake Shore Road, Suite 500, Buffalo, NY 14219 design, specification, plan or report is a violation of section
p (716) 827-8000 f (716) 270-6091 www.nussclarke.com 7209, provision 2 of the New York State Education Law.
TOPOGRAPHIC SURVEY
325, 349 & 355 Orchard Park Road
115, 119, 123, 135, 139, 171, 175, 181, 183, 193 & 197 Slade Avenue
Part of Lots 280, 292, 293 & 294, Township 10, Range 7
Buffalo Creek Reservation
Town of West Seneca
County of Erie, State of New York
Date of Survey: 03/25/2025 Scale : 1" = 60' Sheet 1 of 3 Project No. : 25J2-1661
Page 1041 of 1174
Page 1042
STOP
GV
THIS SURVEY IS NOT VALID WITH AN AFFIDAVIT OF NO CHANGE NO IRONS SET OR FOUND AT PROPERTY CORNERS UNLESS NOTED HEREON.
Unauthorized alterations or additions to any survey, drawing,
3556 Lake Shore Road, Suite 500, Buffalo, NY 14219 design, specification, plan or report is a violation of section
p (716) 827-8000 f (716) 270-6091 www.nussclarke.com 7209, provision 2 of the New York State Education Law.
TOPOGRAPHIC SURVEY
325, 349 & 355 Orchard Park Road
115, 119, 123, 135, 139, 171, 175, 181, 183, 193 & 197 Slade Avenue
Part of Lots 280, 292, 293 & 294, Township 10, Range 7
Buffalo Creek Reservation
Town of West Seneca
County of Erie, State of New York
Date of Survey: 03/25/2025 Scale : 1" = 60' Sheet 2 of 3 Project No. : 25J2-1661
Page 1042 of 1174
Page 1043
GV
THIS SURVEY IS NOT VALID WITH AN AFFIDAVIT OF NO CHANGE NO IRONS SET OR FOUND AT PROPERTY CORNERS UNLESS NOTED HEREON.
Unauthorized alterations or additions to any survey, drawing,
3556 Lake Shore Road, Suite 500, Buffalo, NY 14219 design, specification, plan or report is a violation of section
p (716) 827-8000 f (716) 270-6091 www.nussclarke.com 7209, provision 2 of the New York State Education Law.
TOPOGRAPHIC SURVEY
325, 349 & 355 Orchard Park Road
115, 119, 123, 135, 139, 171, 175, 181, 183, 193 & 197 Slade Avenue
Part of Lots 280, 292, 293 & 294, Township 10, Range 7
Buffalo Creek Reservation
Town of West Seneca
County of Erie, State of New York
Date of Survey: 03/25/2025 Scale : 1" = 60' Sheet 3 of 3 Project No. : 25J2-1661
Page 1043 of 1174
Page 1044
DEMOLITION NOTES: EROSION CONTROL NOTES
1. ALL PERIMETER SILT SOCK TO BE INSTALLED PRIOR TO CONSTRUCTION ACTIVITY BEGINNING. THE FOLLOWING EROSION CONTROL PROCEDURES SHALL BE ADHERED TO BY THE CONTRACTOR:
2. 1. INSTALL TEMPORARY SILT SOCK BARRIERS AS DIRECTED BY THE OWNER AND AT ALL EXISTING STORMWATER CATCH BASINS WITHIN THE WORK AREA TO
CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT THOSE ITEMS TO REMAIN, SUCH AS TREES, PROPERTY
CORNER PINS, UTILITY POLES, VALVES, HYDRANTS, CURBS, MANHOLES AND CATCH BASINS. PREVENT SEDIMENT MIGRATION. ALL SILT SOCK BARRIERS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS SHOWN ON THE PLANS.
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
2. TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON SITE FOR RE-USE AS DIRECTED BY THE OWNER. ALL LOCAL ORDINANCES REGARDING THE SALE OF TOPSOIL
Greensboro
3. TEMPORARY SILT SOCK TO BE INSTALLED AS DIRECTED BY THE OWNERS FIELD REPRESENTATIVE. MAINTAIN
UNTIL VEGETATION IS ESTABLISHED AND PAVEMENT IS INSTALLED. MUST BE FOLLOWED. TOPSOIL MAY NOT BE REMOVED WITHOUT A PERMIT.
PHASE - 1 DEMOLITION NARRATIVE:
4. 3. ALL SILT SOCK BARRIERS SHALL BE REPLACED WHEREVER THEY BECOME CLOGGED OR INOPERABLE.
AS NECESSARY, COVERED DUMPSTERS SHALL BE PROVIDED ONSITE AS REQUIRED FOR CONSTRUCTION WASTE.
DEMOLITION WORK TO BE PERFORMED DURING PHASE-1 SHALL INCLUDE THE FOLLOWING:
- REMOVAL OF EXISTING PAVEMENT, CURBING, SIDEWALK, BUILDING FOOTPRINT/FOUNDATION WITHIN HATCHED LIMITS AS 5. REMOVE ALL TREES AND STUMPS AS SHOWN AND DISPOSE OF OFF SITE. CONTRACTOR TO PROTECT ALL4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND REMOVAL OF TEMPORARY SEDIMENTATION CONTROLS.
SHOWN. TREES/BRUSH NOT DISTURBED BY CONSTRUCTION ACTIVITY. LOCATIONS OF TREES SHOWN ON PLAN ARE
APPROXIMATE, CONTRACTOR TO CONFIRM LOCATION PRIOR TO CONSTRUCTION. 5. THE CONTRACTOR MUST CONTROL DUST DURING CONSTRUCTION. DURING EARTHWORK OPERATIONS, WATER-SPREADING EQUIPMENT SHALL BE PROVIDED BY
THE CONTRACTOR, AND SPREAD WATER AS NECESSARY AND AS DIRECTED BY THE OWNER IN ORDER TO CONTROL DUST.
- REMOVAL OF EXISTING SITE UTILITIES, AS SHOWN ON SHEET 'C-002', TO BE COORDINATED WITH PROPOSED UTILITY
Utica
CONNECTIONS FROM THE PROPOSED UTILITY PLANS IN ORDER TO MAINTAIN FULL SERVICE OF UTILITIES FOR EXISTING TENANTS. 6. CONTRACTOR TO COORDINATE WITH OWNER ON WHICH TREES SHALL BE REMOVED AND WHICH SHALL REMAIN
AND BE PROTECTED DURING CONSTRUCTION. 6. DIRT OR DEBRIS LEFT ON LOCAL PUBLIC ROADS AS A RESULT OF THIS CONSTRUCTION PROJECT SHALL BE REMOVED AND ROAD SURFACES CLEANED BY THE
CONTRACTOR ON A DAILY BASIS.
- REMOVAL OF EXISTING TREES, LIGHT POLES, FENCING, AND OTHER SITE ITEMS AS LISTED ON 'C-001'.
7. EXISTING CURB AND REMOVAL OF EXISTING ENTRANCE SHALL BE SAW CUT FULL-DEPTH AND NEATLY REMOVED
-REMOVAL OF INTERNAL ROADWAY CONNECTION WITHIN EXISTING SITE WHILE MAINTAINING ACCESS FOR EXISTING TENANTS FROM THE BACKSIDE, EXISTING PAVEMENT SHALL NOT BE DISTURBED AND THE PAVEMENT EDGE SHALL7.BE USED
ALL DISTURBED AREAS (EXCEPT AREAS TO BE PAVED OR BUILT UPON) SHALL BE TOPSOILED TO A MINIMUM 4" DEPTH AND SEEDED IMMEDIATELY AFTER FINE
GRADING TAKES PLACE AND AS SOON AS PHYSICALLY POSSIBLE.
Buffalo
ALONG ORCHARD PARK ROAD AND SLADE AVENUE AS SHOWN. AS FORM FOR PLACING NEW CURB.
8. 8. THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE OF DOWNSTREAM STORM SEWERS, DITCHES, AND CULVERTS. SILT BUILDUP FOUND TO BE A RESULT
REMOVE EXISTING BUILDING TO INCLUDE ALL FOUNDATIONS, PORCHES, STEPS, ETC. ALL UTILITY CONNECTIONS
TO BE ABANDONED AND/OR REMOVED PER COUNTY, TOWN, AND UTILITY COMPANY REQUIREMENTS. OF THIS SITE CONSTRUCTION WORK SHALL BE REMOVED FROM DOWNSTREAM CULVERTS BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER OR
THE TOWN/CITY.
PROPOSED CONSTRUCTION CHAIN LINK FENCE 9. ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN PLACE PRIOR TO BEGINNING EARTHWORK OPERATIONS AND SHALL BE
TO BE INSTALLED ALONG CONSTRUCTION MAINTAINED UNTIL THE NEW SLOPES ARE STABILIZED WITH SEEDING AND/OR SLOPE PROTECTION, AS DIRECTED BY THE ENGINEER.
LIMITS FOR PHASE-1 SITE WORK EXISTING BUILDING CONCRETE
FOUNDATION/FOOTPRINT TO BE REMOVED 10. INSTALL TEMPORARY SILT SOCK AROUND THE BASE OF STOCKPILES. STOCKPILES NOT BEING ACTIVELY USED FOR MORE THAN SEVEN (7) DAYS SHALL BE
WITHIN HATCHED LIMITS AS SHOWN STABILIZED.
EX. LIGHT POLE & BASE TO REMAIN 11. THE PROFESSIONAL CERTIFYING COMPLIANCE TO NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS MUST INSPECT AT A MINIMUM WEEKLY, AND
ST
WHEN DISTURBING MORE THAN 5 ACRES TWICE A WEEK, AND SHALL PROVIDE THESE INSPECTION REPORT WITH A WRITTEN CERTIFICATION OF CONSTRUCTION
OP
FOR PHASE-1 DEMO & SHALL BE
REMOVED DURING PHASE-2 DEMO COMPLIANCE TO THE
TOWN OF WEST SENECA(BI)WEEKLY.
OP
ST
12. THE ENGINEER OF RECORD FOR THIS PROJECT CERTIFIES THAT THESE DESIGN PLANS MEET THE REQUIREMENTS AND ARE IN COMPLIANCE WITH THE NEW YORK
STORMWATER MANAGEMENT DESIGN MANUAL AND NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS.
EX. BLACKTOP, CONCRETE, & CURBING WITHIN HATCHED EXISTING CONCRETE CURB ISLANDS TO BE REMOVED
AREA TO BE REMOVED DURING PHASE - 1 OF DEMOLITION WITHIN HATCHED LIMITS AS SHOWN. REFER TO DRAWING
'C-003' FOR EXISTING UTILITY REMOVAL LIMITS & PHASING.
West Seneca Exchange
OP
ST
EX. LIGHT POLE & BASE TO REMAIN
FOR PHASE-1 DEMO & SHALL BE
ST
Slade Ave, Ridge Rd & Orchard Park Rd
EXISTING CONCRETE CURB
OP
REMOVED DURING PHASE-2 DEMO
ISLAND WITH FIRE HYDRANT
& BOLLARDS TO BE REMOVED
EXISTING UTILITY MH TO REMAIN & BE
PROTECTED DURING CONSTRUCTION EXISTING CHAIN LINK FENCE TO BE REMOVED ALONG
EXISTING ROADWAY TO ALLOW FOR PHASE-1 SITE
EX. SIGNS TO BE REMOVED WORK TO BE PERFORMED WITHIN LIMITS AS SHOWN
WITHIN PHASE-1 DEMOLITION
REMOVE EXISTING ROW OF EX. LIGHT POLE &
SIGNAGE WITHIN PARKING LOT BASE TO BE REMOVED
LIMITS OF EX. FENCING TO BE
REMOVED WITHIN PHASE-1 DEMOLITION EX. LIGHT POLE & BASE TO
REMAIN & BE PROTECTED
West Seneca New York
OP
ST
INLET PROTECTION TO BE INSTALLED EX. CONCRETE CURBED
ON INLETS TO REMAIN DURING PHASE-1 ISLAND TO BE REMOVED
© CARMINA WOOD DESIGN
STS
OTPO
OF DEMOLITION, TYP. FOR ALL SHOWN P PROPOSED CONSTRUCTION CHAIN LINK FENCE
TO BE INSTALLED ALONG CONSTRUCTION
LIMITS FOR PHASE-1 SITE WORK EX. LIGHT POLE W/BASE &
BOLLARDS TO BE REMOVED
EXISTING CHAIN LINK FENCE TO BE REMOVED ALONG
EXISTING ROADWAY TO ALLOW FOR PHASE-1 SITE
WORK TO BE PERFORMED WITHIN LIMITS AS SHOWN
CONTRACTOR TO TEMPORARY
CLOSE DOWN ROADWAY WHILE
REMOVING EXISTING UTILITIES EX. LIGHT POLE
& BASE TO BE EX. BLACKTOP, CONCRETE, & CURBING
REMOVED WITHIN HATCHED AREA TO BE REMOVED
DURING PHASE - 1 OF DEMOLITION
GV
EXISTING SITE ENTRANCE AT ORCHARD PARK EX. BLACKTOP, CONCRETE, & CURBING
ROAD TO REMAIN OPEN AND MAINTAINED EX. TREE TO BE REMOVED DURING PHASE - 1 WITHIN HATCHED AREA TO BE REMOVED
OF DEMOLITION, TYPICAL FOR ALL SHOWN EX. FENCING TO BE REMOVED DURING PHASE - 1 OF DEMOLITION
FOR ENTIRE DURATION OF CONSTRUCTION WITHIN PHASE-1 DEMOLITION
Date
EX. LIGHT POLE & BASE
TO BE REMOVED
GV
LIMIT OF PROPOSED SILT
SOCK TO BE INSTALLED
EX. CURBING TO BE REMOVED EX. CURBING AND ROADWAY
GATE TO BE REMOVED
No. Description
EX. LIGHT POLE &
BASE TO BE REMOVED
EX. TREE TO BE REMOVED DURING PHASE - 1
REVISIONS:
OF DEMOLITION, TYPICAL FOR ALL SHOWN
PROPOSED SILT SOCK TO BE
GV
INSTALLED AT LOCATIONS SHOWN.
CONTRACTOR TO MAINTAIN UNTIL
SITE HAS BEEN FULLY STABILIZED. EX. TREE TO BE REMOVED EXISTING CHAIN LINK FENCE TO BE REMOVED ALONG
DURING PHASE - 1 OF EXISTING ROADWAY TO ALLOW FOR PHASE-1 SITE
DEMOLITION, TYPICAL WORK TO BE PERFORMED WITHIN LIMITS AS SHOWN
FOR ALL SHOWN
EX. BLACKTOP & CURBING WITHIN
HATCHED AREA TO BE REMOVED
DURING PHASE - 1 OF DEMOLITION
EXISTING TREES TO BE REMOVED AS SHOWN; REFER
Sealed 07/20/2026
EX. SECTION OF
FENCING TO BE TO OFFSITE ROADWAY IMPROVEMENT PLANS FOR
EX. ROADWAY GATES REMOVED LIMITS OF REMOVAL BY PASSERO ASSOCIATES
TO BE REMOVED
EX. BLACKTOP, CONCRETE, & CURBING WITHIN HATCHED EX. OFFICE
AREA TO BE REMOVED DURING PHASE - 1 OF DEMOLITION 7,980 SF
INSTALL STABILIZED CONSTRUCTION ENTRANCE &
CONCRETE WASHOUT AREA AT LOCATION SHOWN.
LIMITS OF EX. FENCING TO BE
CONTRACTOR TO MAINTAIN ENTRANCE & CONCRETE
REMOVED WITHIN PHASE-1 DEMOLITION
GV
WASHOUT PIT FOR DURATION OF CONSTRUCTION
EX. BLACKTOP, CONCRETE, &
CURBING WITHIN HATCHED
GV
AREA TO BE REMOVED DURING
PHASE - 1 OF DEMOLITION
DRAWING NAME:
EX. CURBED ISLAND TO BE REMOVED PROPOSED SILT SOCK TO BE INSTALLED AT PROVIDE OPENING ALONG SILT SOCK AS SHOWN DEMOLITION & EROSION CONTROL LEGEND
LOCATIONS SHOWN. CONTRACTOR TO MAINTAIN
UNTIL SITE HAS BEEN FULLY STABILIZED.
FOR PROPOSED SITE DRIVEWAY. CONTRACTOR TO
MAINTAIN UNTIL SITE HAS BEEN FULLY STABILIZED.
PROPOSED SILT SOCK TO BE
INSTALLED AT LOCATIONS SHOWN.
LIMIT OF PROPOSED SILT
SOCK TO BE INSTALLED
Demolition &
INSTALL STABILIZED CONSTRUCTION ENTRANCE & EXISTING PAVEMENT, CONCRETE, & CURBING TO BE
CONCRETE WASHOUT AREA AT LOCATION SHOWN.
CONTRACTOR TO MAINTAIN UNTIL
SITE HAS BEEN FULLY STABILIZED. SAWCUT & REMOVED WITHIN HATCHED LIMITS Erosion Control
CONTRACTOR TO MAINTAIN ENTRANCE & CONCRETE EX. TREE TO BE REMOVED DURING PHASE - 1
WASHOUT PIT FOR DURATION OF CONSTRUCTION OF DEMOLITION, TYPICAL FOR ALL SHOWN Plan - PH1
PROPOSED SILT SOCK
DEMO & E.C. PLAN - PHASE 1 EXISTING TREE TO BE REMOVED Date:
Drawn By:
Scale:
07/20/26
C. Wood
As Noted
SCALE: 1"=100' PROPOSED STORM INLET PROTECTION
DRAWING NO.
C-001
EXISTING UTILITY STRUCTURE & PIPING TO BE REMOVED
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
STABILIZED CONSTRUCTION ENTRANCE CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
100 0 100 200Ft. Project No: 24-4113
CONCRETE WASHOUT AREA 100'
Page 1044 of 1174
Page 1045
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
Utica
Buffalo
EX. SAN MH #15, EX. SAN MH 16, EX. SAN. MH #17, SAN MH #20,
& EX. SAN MH 18 WITH ASSOCIATED PIPING TO BE REMOVED
LIMITS OF REMOVAL FOR EX. STORM SEWER, EX. STORM MH #2 TO REMAIN &
BE PROTECTED DURING CONSTRUCTION. PLUG EX. NE. INVERT WITHIN EX. MH
ST
OP
REMOVE EXISTING STORM STRUCTURES (CB-43 & EXISTING STORM STRUCTURE CB-71 & ASSOCIATED
OP
CB-44) ALONG WITH ASSOCIATED PIPING, AS SHOWN PIPING TO BE REMOVED DURING PHASE-1 DEMOLITION
ST
LIMITS OF REMOVAL FOR EX. 8" SANITARY SEWER, EX. SANITARY
MH #19 TO REMAIN & BE PROTECTED DURING CONSTRUCTION
EXISTING FIRE HYDRANT TO BE REMOVED DURING PHASE-1 DEMOLITION.
West Seneca Exchange
PROPOSED HYDRANT TO BE INSTALLED NEARBY THIS EXISTING
LOCATION TO PROVIDE FIRE COVERAGE DURING CONSTRUCTION; REFER
ST
OP TO UTILITY PLANS FOR LOCATION OF NEW FIRE HYDRANT ASSEMBLY
EXISTING 10" WATERMAIN TO BE ABANDONED IN PLACE, OR
ST
EXISTING STORM STRUCTURES (CB-65 &
Slade Ave, Ridge Rd & Orchard Park Rd
OP
CB-66) & ASSOCIATED PIPING TO BE REMOVED WITHIN HATCHED LIMITS AS SHOWN, CONTRACTOR
REMOVED DURING PHASE-1 DEMOLITION TO COORDINATE WITH APPROPRIATE UTILITY COMPANY
LIMITS OF REMOVAL FOR EX. STORM SEWER, EX. STORM MH #16 TO REMAIN &
BE PROTECTED DURING CONSTRUCTION. PLUG EX. W. INVERT WITHIN EX. MH
EXISTING STORM STRUCTURE CB-70 & ASSOCIATED
EX. STORM CB-42 & ST MH #1 WITH PIPING TO BE REMOVED DURING PHASE-1 DEMOLITION
ASSOCIATED PIPING TO BE REMOVED
EX. 8" SANITARY SEWER TO BE ABANDONED
West Seneca New York
EX. SANITARY MH #14 WITH IN PLACE, OR REMOVED, WITHIN LIMITS AS
ASSOCIATED PIPING TO BE REMOVED SHOWN, COORDINATE WITH CONTRACTOR. EXISTING SANITARY MH-22 & SAN MH #21 & ASSOCIATED
PIPING TO BE REMOVED DURING PHASE-1 DEMOLITION
© CARMINA WOOD DESIGN
STS
REMOVE EXISTING STORM STRUCTURES
OTPO
P EXISTING STORM CB-52, CB-53, ST MH #6,
(CB-39, CB-41, & CB-40) ALONG WITH & ST MH #7 & ASSOCIATED PIPING TO BE EX. SANITARY MH-23 WITH ASSOCIATED PIPING
ASSOCIATED PIPING, AS SHOWN REMOVED DURING PHASE-1 DEMOLITION TO BE REMOVED DURING PHASE-1 DEMOLITION
EXISTING STORM STRUCTURES (CB-67,
CB-68, & CB-69) & ASSOCIATED PIPING TO EXISTING 10" WATERMAIN TO BE
EX. SANITARY PIPING REMOVED UP TO EXISTING METER
TO BE REMOVED BE REMOVED DURING PHASE-1 DEMOLITION
PIT. EXISTING METER PIT TO
REMAIN AND BE REUSED. REFER TO
EX. ABANDONED GAS LINE TO BE PLANS BY OTHERS FOR PROPOSED
EX. SANITARY REMOVED WITHIN LIMITS AS SHOWN; CONNECTION TO EXISTING WATER
LIMITS OF REMOVAL FOR EX. 10" SANITARY PIPING TO BE CONTRACTOR TO COORDINATE WITH SERVICE
EX. SAN MH-31 EXISTING UTILITY MH & EX. SANITARY MH-24 & APPROPRIATE UTILITY COMPANY
SEWER, EX. SANITARY MH #13 TO REMAIN REMOVED ASSOCIATED LINES TO BE REMOVED
TO BE REMOVED ASSOCIATED PIPING TO
GV
& BE PROTECTED DURING CONSTRUCTION DURING PHASE-1 DEMOLITION BE REMOVED DURING
EX. CB-51 WITH PHASE-1 DEMOLITION
ASSOCIATED PIPING
TO BE REMOVED
EX. ABANDONED GAS LINE TO BE EXISTING 10" WATERMAIN TO BE
Date
EX. E-MH STRUCTURE REMOVED WITHIN LIMITS AS SHOWN; ABANDONED IN PLACE, OR REMOVED
TO BE REMOVED CONTRACTOR TO COORDINATE WITH WITHIN HATCHED LIMITS AS SHOWN,
APPROPRIATE UTILITY COMPANY CONTRACTOR TO COORDINATE WITH
APPROPRIATE UTILITY COMPANY
GV
CONTRACTOR TO VERIFY
LOCATION PREVIOUSLY EX. CB-50 & CB-54
ABANDONED EX. 12" SANITARY TO BE REMOVED
No. Description
SEWER & REMOVE UP TO EX. STORM ST MH #17 WITH
LIMITS AS SHOWN DURING ASSOCIATED PIPING TO BE REMOVED
PROPOSED SANITARY MANHOLE #1
REVISIONS:
PHASE-1 DEMOLITION EX. CB-55, CB-56, CB-57, DURING PHASE-1 DEMOLITION
(DOGHOUSE) TO BE INSTALLED AT LOCATION CB-58 & CB-59 WITH
SHOWN PRIOR TO EXISTING SANITARY SEWER
GV
ASSOCIATED PIPING TO BE
REMOVED/ABANDONED IN PLACE. REMOVED DURING PHASE-1
DEMOLITION EX. CB-20 & ST MH-8 WITH
LIMITS OF REMOVAL FOR PREVIOUSLY ASSOCIATED PIPING TO BE REMOVED
ABANDONED EX. 12" SANITARY SEWER, EX. STORM SEWER PIPING DURING PHASE-1 DEMOLITION
EX. SANITARY MH #32 TO REMAIN & BE TO BE REMOVED DURING
PROTECTED DURING CONSTRUCTION PHASE-1 DEMOLITION
EX. UTILITY STRUCTURES & ASSOCIATED UNDERGROUND EX. CB-61 & BC-60 WITH
EX. CB-49 WITH ASSOCIATED ELECTRICAL SERVICE TO BE REMOVED WITHIN LIMITS AS SHOWN; ASSOCIATED PIPING TO
Sealed 07/20/2026
PIPING TO BE REMOVED CONTRACTOR TO COORD. W/ APPROPRIATE UTILITY COMPANY BE REMOVED DURING
WITHIN PHASE-1 DEMOLITION PHASE-1 DEMOLITION
EX. GAS LINE TO BE REMOVED WITHIN LIMITS
AS SHOWN; CONTRACTOR TO COORDINATE
WITH APPROPRIATE UTILITY COMPANY EX. OFFICE NOTE:
7,980 SF
EXSTING UTILITIES SHOWN ON THIS SHEET ARE BASED ON
EXISITING PLANS FOR THE AREA. CONTRACTOR SHALL VERIFY
ALL LOCATIONS PRIOR TO CONSTRUCTION & NOTIFY ENGINEER
OF ANY DISCREPANCIES.
GV
EXISTING UTILITIES NOT SHOWN TO BE REMOVED WILL REMAIN
AND BE PROTECTED DURING CONSTRUCTION. REFER TO UTILITY
GV
PLAN FOR LIMITS OF REMOVAL AND PROPOSED RECONNECTIONS
PROPOSED & EXISTING UTILITY PHASING NOTE:
DRAWING NAME:
CONTRACTOR SHALL COORDINATE INSTALLATION OF PROPOSED PRIORUTILITIES
TO ANY REMOVAL OF Demolition &
EXISTING UTILITIES TO ENSURE THERE IS NO LAPSE IN COVERAGE FOR EXISTING/PROPOSED TENANTS.
PROPOSED UTILITY LINES SHOWN ON THIS PLAN FOR INFORMATION ONLY. REFER TO UTILITY PLAN Erosion Control
DRAWINGS FOR FULL DESIGN. DEMOLITION & EROSION CONTROL LEGEND Plan - Utility Phasing
EXISTING PAVEMENT, CONCRETE, & CURBING TO BE
DEMO & E.C. PLAN - UTILITY PHASING SAWCUT & REMOVED WITHIN HATCHED LIMITS Date:
Drawn By:
Scale:
07/20/26
C. Wood
As Noted
PROPOSED SILT SOCK
SCALE: 1"=100' DRAWING NO.
EXISTING TREE TO BE REMOVED
PROPOSED STORM INLET PROTECTION
100 0 100 200Ft.
C-002
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
Project No: 24-4113
EXISTING UTILITY STRUCTURE & PIPING TO BE REMOVED 100'
Page 1045 of 1174
Page 1046
DEMOLITION NOTES: EROSION CONTROL NOTES
1. ALL PERIMETER SILT SOCK TO BE INSTALLED PRIOR TO CONSTRUCTION ACTIVITY BEGINNING. THE FOLLOWING EROSION CONTROL PROCEDURES SHALL BE ADHERED TO BY THE CONTRACTOR:
PHASE - 2 DEMOLITION NARRATIVE:
2. 1. INSTALL TEMPORARY SILT SOCK BARRIERS AS DIRECTED BY THE OWNER AND AT ALL EXISTING STORMWATER CATCH BASINS WITHIN THE WORK AREA TO
CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT THOSE ITEMS TO REMAIN, SUCH AS TREES, PROPERTY
DEMOLITION WORK TO BE PERFORMED DURING PHASE-2 SHALL INCLUDE THE FOLLOWING: CORNER PINS, UTILITY POLES, VALVES, HYDRANTS, CURBS, MANHOLES AND CATCH BASINS. PREVENT SEDIMENT MIGRATION. ALL SILT SOCK BARRIERS SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS SHOWN ON THE PLANS.
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
2. TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON SITE FOR RE-USE AS DIRECTED BY THE OWNER. ALL LOCAL ORDINANCES REGARDING THE SALE OF TOPSOIL
Greensboro
- REMOVAL OF EXISTING PAVEMENT, CURBING, SIDEWALK, BUILDING FOOTPRINT/FOUNDATION WITHIN HATCHED LIMITS AS SHOWN. 3. TEMPORARY SILT SOCK TO BE INSTALLED AS DIRECTED BY THE OWNERS FIELD REPRESENTATIVE. MAINTAIN
UNTIL VEGETATION IS ESTABLISHED AND PAVEMENT IS INSTALLED. MUST BE FOLLOWED. TOPSOIL MAY NOT BE REMOVED WITHOUT A PERMIT.
- REMOVAL OF REMAINING EXISTING SITE UTILITIES WITHIN PHASE - 2 DEMOLITION LIMITS, AS SHOWN ON SHEET 'C-002', TO BE
COORDINATED WITH PROPOSED UTILITY CONNECTIONS FROM THE PROPOSED UTILITY PLANS IN ORDER TO MAINTAIN FULL SERVICE 4. 3. ALL SILT SOCK BARRIERS SHALL BE REPLACED WHEREVER THEY BECOME CLOGGED OR INOPERABLE.
AS NECESSARY, COVERED DUMPSTERS SHALL BE PROVIDED ONSITE AS REQUIRED FOR CONSTRUCTION WASTE.
OF UTILITIES FOR EXISTING TENANTS.
5. REMOVE ALL TREES AND STUMPS AS SHOWN AND DISPOSE OF OFF SITE. CONTRACTOR TO PROTECT ALL4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND REMOVAL OF TEMPORARY SEDIMENTATION CONTROLS.
- REMOVAL OF EXISTING TREES, LIGHT POLES, FENCING, AND OTHER SITE ITEMS AS LISTED ON 'C-003'. TREES/BRUSH NOT DISTURBED BY CONSTRUCTION ACTIVITY. LOCATIONS OF TREES SHOWN ON PLAN ARE
APPROXIMATE, CONTRACTOR TO CONFIRM LOCATION PRIOR TO CONSTRUCTION. 5. THE CONTRACTOR MUST CONTROL DUST DURING CONSTRUCTION. DURING EARTHWORK OPERATIONS, WATER-SPREADING EQUIPMENT SHALL BE PROVIDED BY
-REMOVAL OF EXISTING ACCESS TO 'TOPS MARKETS' AT ORCHARD PARK ROADWAY & CONNECTION TO PROPOSED INTERNAL THE CONTRACTOR, AND SPREAD WATER AS NECESSARY AND AS DIRECTED BY THE OWNER IN ORDER TO CONTROL DUST.
Utica
ROADWAY AS SHOWN ON PLAN 'C-003' TO RE-INTRODUCE INTERNAL TRAFFIC FLOW TO PLAZA. 6. CONTRACTOR TO COORDINATE WITH OWNER ON WHICH TREES SHALL BE REMOVED AND WHICH SHALL REMAIN
AND BE PROTECTED DURING CONSTRUCTION. 6. DIRT OR DEBRIS LEFT ON LOCAL PUBLIC ROADS AS A RESULT OF THIS CONSTRUCTION PROJECT SHALL BE REMOVED AND ROAD SURFACES CLEANED BY THE
CONTRACTOR ON A DAILY BASIS.
7. EXISTING CURB AND REMOVAL OF EXISTING ENTRANCE SHALL BE SAW CUT FULL-DEPTH AND NEATLY REMOVED
FROM THE BACKSIDE, EXISTING PAVEMENT SHALL NOT BE DISTURBED AND THE PAVEMENT EDGE SHALL7.BE USED
ALL DISTURBED AREAS (EXCEPT AREAS TO BE PAVED OR BUILT UPON) SHALL BE TOPSOILED TO A MINIMUM 4" DEPTH AND SEEDED IMMEDIATELY AFTER FINE
GRADING TAKES PLACE AND AS SOON AS PHYSICALLY POSSIBLE.
Buffalo
AS FORM FOR PLACING NEW CURB.
8. 8. THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE OF DOWNSTREAM STORM SEWERS, DITCHES, AND CULVERTS. SILT BUILDUP FOUND TO BE A RESULT
REMOVE EXISTING BUILDING TO INCLUDE ALL FOUNDATIONS, PORCHES, STEPS, ETC. ALL UTILITY CONNECTIONS
TO BE ABANDONED AND/OR REMOVED PER COUNTY, TOWN, AND UTILITY COMPANY REQUIREMENTS. OF THIS SITE CONSTRUCTION WORK SHALL BE REMOVED FROM DOWNSTREAM CULVERTS BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER OR
THE TOWN/CITY.
9. ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN PLACE PRIOR TO BEGINNING EARTHWORK OPERATIONS AND SHALL BE
MAINTAINED UNTIL THE NEW SLOPES ARE STABILIZED WITH SEEDING AND/OR SLOPE PROTECTION, AS DIRECTED BY THE ENGINEER.
10. INSTALL TEMPORARY SILT SOCK AROUND THE BASE OF STOCKPILES. STOCKPILES NOT BEING ACTIVELY USED FOR MORE THAN SEVEN (7) DAYS SHALL BE
STABILIZED.
11. THE PROFESSIONAL CERTIFYING COMPLIANCE TO NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS MUST INSPECT AT A MINIMUM WEEKLY, AND
ST
PROPOSED CONSTRUCTION FENCE TO BE WHEN DISTURBING MORE THAN 5 ACRES TWICE A WEEK, AND SHALL PROVIDE THESE INSPECTION REPORT WITH A WRITTEN CERTIFICATION OF CONSTRUCTION
OP
INSTALLED FOR DURATION OF PHASE-2 COMPLIANCE TO THE
TOWN OF WEST SENECA(BI)WEEKLY.
OP
DEMOLITION; CONTRACTOR TO COORDINATE
ST
LOCATION & ACCESS WITH TENANTS ON SITE 12. THE ENGINEER OF RECORD FOR THIS PROJECT CERTIFIES THAT THESE DESIGN PLANS MEET THE REQUIREMENTS AND ARE IN COMPLIANCE WITH THE NEW YORK
STORMWATER MANAGEMENT DESIGN MANUAL AND NYSDEC PHASE II STORMWATER REGULATION REQUIREMENTS.
West Seneca Exchange
LIMITS OF EXISTING PAVEMENT
& CURBING TO BE REMOVED ST
OP
FOR PHASE-2 DEMOLITION
ST
Slade Ave, Ridge Rd & Orchard Park Rd
OP
EX. BLACKTOP, CONCRETE, & CURBING WITHIN HATCHED
AREA TO BE REMOVED DURING PHASE-2 OF DEMOLITION
EX. LIGHT POLE &
BASE TO BE REMOVED
EX. LIGHT POLE &
BASE TO BE REMOVED PROPOSED CONSTRUCTION FENCE TO BE
EXISTING ENTRANCE ALONG ORCHARD PARK ROAD TO INSTALLED FOR DURATION OF PHASE-2
West Seneca New York
REMAIN OPEN TO MAINTAIN ACCESS TO EXISTING DEMOLITION; CONTRACTOR TO COORDINATE
BUSINESS(S) TO UTILIZE THIS ENTRANCE AREA DURING LOCATION & ACCESS WITH TENANTS ON SITE
PHASE-1 AND PHASE-2 OF DEMOLITION/CONSTRUCTION
© CARMINA WOOD DESIGN
STS
OTPO
P
LIMITS OF EXISTING PAVEMENT & CURBING
TO BE REMOVED FOR PHASE-2 DEMOLITION
EX. FIRE HYRANT TO BE REMOVED
EX. LIGHT POLE & BASE TO BE REMOVED NOTE:
EX. TREE TO BE REMOVED DURING PHASE-2
REFER TO PLANS BY OTHERS FOR PROPOSED EROSION
OF DEMOLITION, TYPICAL FOR ALL SHOWN CONTROL MEASURES WITHIN THIS PORTION OF THE SITE.
LIMITS OF EXISTING PAVEMENT & CURBING
EX. BLACKTOP,
GV
TO BE REMOVED FOR PHASE-2 DEMOLITION
CONCRETE, & CURBING
WITHIN HATCHED AREA
EXISTING ENTRANCE ALONG ORCHARD PARK ROAD TO TO BE REMOVED DURING
REMAIN OPEN TO MAINTAIN ACCESS TO EXISTING PHASE-2 OF DEMOLITION
BUSINESS(S) TO UTILIZE THIS ENTRANCE AREA DURING
Date
PHASE-1 AND PHASE-2 OF DEMOLITION/CONSTRUCTION
PROPOSED INTERIOR PROPOSED CONSTRUCTION FENCE TO BE INSTALLED FOR
ROADWAY TO BE INSTALLED DURATION OF PHASE-2 DEMOLITION; CONTRACTOR TO
PER SITE PLANS COORDINATE LOCATION & ACCESS WITH TENANTS ON SITE
GV
LIMITS OF EXISTING PAVEMENT & CURBING
No. Description
TO BE REMOVED FOR PHASE-2 DEMOLITION
REVISIONS:
GV
NOTE: PROPOSED INTERIOR ROADWAY
INSTALL PROPOSED DETENTION BASIN. TO BE INSTALLED PER SITE PLANS
REMOVE SILT BUILD UP TO DESIGN GRADES
UPON COMPLETION OF CONSTRUCTION.
Sealed 07/20/2026
PROPOSED INLET PROTECTION TO BE INSTALLED ON ALL EXISTING TO REMAIN
AND PROPOSED CATCH BASIN STRUCTURES, TYPICAL FOR ALL SHOWN
EX. OFFICE
7,980 SF
GV
GV
DRAWING NAME:
PROPOSED SILT SOCK TO BE
INSTALLED AT LOCATIONS SHOWN.
Demolition &
CONTRACTOR TO MAINTAIN UNTIL
SITE HAS BEEN FULLY STABILIZED.
Erosion Control
Plan - PH2
DEMOLITION & EROSION CONTROL LEGEND
DEMO & E.C. PLAN - PHASE 2 EXISTING PAVEMENT, CONCRETE, & CURBING TO BE
SAWCUT & REMOVED WITHIN HATCHED LIMITS
Date:
Drawn By:
Scale:
07/20/26
C. Wood
As Noted
SCALE: 1"=100' DRAWING NO.
PROPOSED SILT SOCK
EXISTING TREE TO BE REMOVED
PROPOSED STORM INLET PROTECTION
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
100 0 100 200Ft.
C-003
Project No: 24-4113
100'
Page 1046 of 1174
Page 1047
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
2"X4" WOOD FRAME
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
CONCRETE BLOCK
Greensboro
DEWATERING
1.5' MAX.
1" REBAR FOR BAG
STAKE DUMP REMOVAL FROM INLET
FLOW DUMP STRAPS
FLOW STRAP
FABRIC (2 EACH)
2:1 SLOPE GRAVEL FILTER EXPANSION RESTRAINT DUMP STRAP
3' MIN.
(1/4" NYLON ROPE, 1" REBAR FOR BAG
STONE & BLOCK PLAN VIEW 2" FLAT WASHERS) REMOVAL FROM INLET
TEMPORARY WIRE SCREEN BAG DETAIL SILTSACK
Utica
SEDIMENT POOL DEWATERING (MANUFACTURED BY ACF,
OR EQUAL)
EXCAVATED AREA (AS REQUIRED)
DROP INLET BURIED FABRIC
1'MIN.
16"
FLOW WITH GATE
FRAME 2'MAX.
FLOW
Buffalo
NOTE:
2" DROP INLET INSPECT AFTER EVERY
WITH GATE RAINFALL OR 3 WEEKS AND
1' MIN.
EMPTY.
SEDIMENT
SIDE SLOPE 2:1 GATHER EXCESS AT TEMPORARY SEDIMENT POOL STONE & BLOCK DETAIL
CORNERS
1'MIN. 2:1 SLOPE 3:1 SLOPE WIRE MESH (OPTIONAL) INSTALLATION DETAIL
EXCAVATED DEPTH MIN. 1' TO A
CONSTRUCTION SPECIFICATIONS 2'MAX.
1'
MAX. 2' BELOW TOP OF INLET. WEEP HOLES GRAVEL SUPPORTED BY HARDWARE
FOR CLOTH TO ALLOW DRAINAGE AND 1. FILTER FABRIC SHALL HAVE AN EOS OF 40-85. BURLAP MAY BE USED FOR SHORT TERM APPLICATIONS. FINE GRAVEL FACE
(1'MIN. THICKNESS)
SILT SACK DETAIL
DEWATERING RESTRICT SEDIMENT MOVEMENT. NOT TO SCALE
2. CUT FABRIC FROM A CONTINUOUS ROLL TO ELIMINATE JOINTS. IF JOINTS ARE NEEDED THEY WILL BE OVERLAPPED TO 3" STONE
THE NEXT STAKE. "DOUGHNUT" DETAIL
3. STAKE MATERIALS WILL BE STANDARD 2" x 4" WOOD OR EQUIVALENT. METAL WITH A MINIMUM LENGTH OF 3 FEET. CONSTRUCTION SPECIFICATIONS
CONSTRUCTION SPECIFICATIONS 4. SPACE STAKES EVENLY AROUND INLET 3 FEET APART AND DRIVE A MINIMUM 18 INCHES DEEP. SPANS GREATER THAN 3 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE FOR DEWATERING. FOUNDATION SHALL BE 2 INCHES MINIMUM BELOW REST OF LATH AND
FEET MAY BE BRIDGED WITH THE USE OF WIRE MESH BEHIND THE FILTER FABRIC FOR SUPPORT. INLET AND BLOCKS SHALL BE PLACED AGAINST INLET FOR SUPPORT. STRAW BALE FLAGGING ON
1. CLEAR THE AREA OF ALL DEBRIS THAT WILL HINDER EXCAVATION. BINDER WIRE 3 SIDES 10' MIN.
5.
FABRIC SHALL BE EMBEDDED 1 FOOT MINIMUM BELOW GROUND AND BACKFILLED. IT SHALL BE SECURELY FASTENED TO2. HARDWARE CLOTH OR 1/2" WIRE MESH SHALL BE PLACED OVER BLOCK OPENINGS TO SUPPORT STONE. STAPLES
West Seneca Exchange
2. GRADE APPROACH TO THE INLET UNIFORMLY AROUND THE BASIN. THE STAKES AND FRAME. (2 PER BALE) 10 mil PLASTIC PLYWOOD SANDBAG
LINING 48"X24" BLACK LETTERS
3. USE CLEAN STONE OR GRAVEL 1/2-3/4 INCH IN DIAMETER PLACED 2 INCHES BELOW TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER. PAINTED WHITE
3. WEEP HOLES SHALL BE PROTECTED BY GRAVEL. 6. A 2" x 4" WOOD FRAME SHALL BE COMPLETED AROUND THE CREST OF THE FABRIC FOR OVER FLOW STABILITY. 6" HEIGHT
A A
VARIES
4. FOR STONE STRUCTURES ONLY, A 1 FOOT THICK LAYER OF THE FILTER STONE WILL BE PLACED AGAINST THE 3 INCH STONE AS SHOWN ON THE SECTION B-B CONCRETE LAG SCREWS
4. MAXIMUN DRAINAGE AREA 1 ACRE
UPON STABILIZATION OF CONTRIBUTING DRAINAGE AREA, SEAL WEEP HOLES, FILL BASIN WITH STABLE SOIL TO FINAL GRADE,
Slade Ave, Ridge Rd & Orchard Park Rd
DRAWINGS. WOOD OR NOT TO SCALE
WASHOUT
COMPACT IT PROPERLY AND STABILIZE WITH PERMANENT SEEDING. METAL STAKES WOOD POST
36"
MAXIMUM DRAINAGE AREA 1 ACRE (2 PER BALE) 3.5"X3.5"X8'
10' MIN.
MAXIMUM DRAINAGE AREA 1 ACRE
BERM
36"
SANDBAG
CONCRETE WASHOUT 10 mil PLASTIC LINING
10 mil
B B SIGN DETAIL PLASTIC PLAN
(OR EQUIVALENT)
VARIES
3'
LINING NOT TO SCALE
INLET PROTECTION DETAIL 1 INLET PROTECTION DETAIL 2 INLET PROTECTION DETAIL 3 2" BERM
TYPE "BELOW GRADE"
NOT TO SCALE NOT TO SCALE NOT TO SCALE SECTION A-A
NOT TO SCALE
10 mil PLASTIC LINING
8"
West Seneca New York
1.12" DIA
NOTE: INSTALL ONE OF THE INLET PROTECTION OPTIONS SHOWN PRIOR TO CONSTRUCTION STEEL WIRE
STAPLE
10 mil PLASTIC LINING STRAW BALE DETAIL
© CARMINA WOOD DESIGN
PLAN (TYP) WOOD FRAME SECURELY
NOT TO SCALE FASTENED AROUND SECTION B-B
ENTIRE PERIMETER NOT TO SCALE
TYPE "ABOVE GRADE" WITH STRAW BALES WITH TWO STAKES
NOTES 10' MIN. TWO-STACKED
1. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD. 2X12 ROUGH
B B WOOD FRAME
2. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30' OF THE
TEMPORARY CONCRETE WASHOUT FACILITY.
VARIES
3. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE WASHOUT STAKE (TYP)
FACILITIES SHALL BE REMOVED FROM THE SITE OF THE WORK AND
WOODEN STAKES ON DISPOSED OF OR RECYCLED.
10' LINEAL SPACING
(IF ON SLOPE, STAKE ON 4. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY
DOWNSTREAMSIDE OF SILT SOCK) THE REMOVAL OF THE TEMPORARY CONCRETE WASHOUT FACILITIES TYPE "ABOVE GROUND"
SHALL BE BACKFILLED, REPAIRED, AND STABILIZED TO PREVENT 10 mil PLASTIC LINING
10' MAX. C. TO C.
WITH WOOD PLANKS
6"MIN. 50'MIN.
SILT SOCK EROSION. PLAN
Date
FILTER CLOTH (SECURELY ATTACHED EXISTING
NOT TO SCALE
TO STAKES) 3' 5:
1
PAVEMENT AREA TO BE
PROTECTED
2"x2" WOODEN STAKE
(IF ON SLOPE, STAKE ON
CONCRETE WASHOUT DETAIL
MOUNTABLE BERM DOWNSTREAMSIDE OF SILT SOCK) NOT TO SCALE
FILTER
36" MIN. LENGTH FENCE POSTS DRIVEN EXISTING (OPTIONAL) WATER FLOW
CLOTH PROFILE AREA TO BE
MIN. 16" INTO GROUND GROUND SILT SOCK WORK AREA PROTECTED
50'MIN.
HEIGHT OF FILTER = 16" MIN.
10'MIN.
EXISTING WORK AREA
12"±
W EMBED FILTER CLOTH A GROUND
No. Description
O OW
12'MIN.
FL FL MIN. OF 6" IN GROUND.
12'MIN.
EXISTING
PAVEMENT
REVISIONS:
FILTER CLOTH DEPTH PERSPECTIVE VIEW EXISTING TREE PROTECTION FENCE
10'MIN.
MARKINGS PLAN VIEW PLAN VIEW SECTION VIEW
MATERIALS
36" MIN. FENCE POST MATERIALS FOR TEMPORARY PLASTIC BARRIER FENCES SHALL MEET THE FOLLOWING REQUIREMENTS:
POSTS SHALL BE A MINIMUM OF 20" CONSTRUCTION SPECIFICATIONS • FENCE: HIGH-DENSITY POLYETHYLENE MESH, ULTRAVIOLET-STABILIZED MIN. 2 YEARS; MINIMUM HEIGHT
FILTER CLOTH ATTACHED TO POST ABOVE THE EXISTING GRADE 4.0 FEET. COLOR: HIGH-VISIBILITY ORANGE OR GREEN. WHEN USED TO PROTECT TREES OR OTHER
1. STONE SIZE - USE 2" STONE, OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT. SILT SOCK VEGETATION, COLOR SHALL BE HIGH-VISIBILITY ORANGE.
FLOW • POSTS: RIGID METAL OR WOOD POSTS, MINIMUM LENGTH 6.0 FEET.
6"±
UNDISTURBED GROUND 2. LENGTH - NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE LOT WHERE A 30 FOOT MINIMUM LENGTH WOULD • TIES: STEEL WIRE, #14 GAUGE OR NYLON CABLE TIES.
COMPACTED SOIL APPLY). 2"x2" WOODEN STAKE @ 45° 2"x2" WOODEN STAKE @ 45° • WARNING SIGNS: SHEET METAL, PLASTIC OR OTHER RIGID, WATERPROOF MATERIAL, 1.5 FEET BY 2.0 FEET
PLAN VIEW OF ROOTS
EMBED FILTER CLOTH POSTS SHALL BE A MINIMUM OF 16" WITH 4 INCH BLACK LETTERS ON A WHITE BACKGROUND. TEXT SHALL BE: "PROTECTED SITE - KEEP OUT"
A MIN. OF 6" IN GROUND BELOW THE EXISTING GRADE 3. THICKNESS - NOT LESS THAN SIX (6) INCHES. UNLESS OTHERWISE SPECIFIED.
45°
4"
SECTION VIEW 4. WIDTH - TWELVE (12) FOOT MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS DETAILS
Sealed 07/20/2026
OCCURS. TWENTY-FOUR (24) FOOT IF SINGLE ENTRANCE TO SITE.
12"±
FENCES SHALL BE ERECTED PRIOR TO MOVING CONSTRUCTION EQUIPMENT ONTO ANY AREA DESIGNATED FOR
5. FILTER CLOTH - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE. PROTECTION.
CONSTRUCTION SPECIFICATIONS
6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED THE LINE OF FENCES SHALL BE STAKED OR MARKED OUT ON THE GROUND BY THE CONTRACTOR AND APPROVED
ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. BY THE ENGINEER/OWNER BEFORE ANY FENCE IS INSTALLED. WHERE USED FOR PROTECTION OF INDIVIDUAL TREES,
1. WOVEN FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. POSTS SHALL BE STEEL EITHER "T" FENCE SHALL BE PLACED AT THE DRIP LINE (EXTENT OF CANOPY). IF NOT POSSIBLE, PLACEMENT SHALL BE AS
OR "U" TYPE OR HARDWOOD. 7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING SECTION VIEW @ JOINT OVERLAP CLOSE TO THE DRIP LINE AS POSSIBLE AND IN NO CASE LESS THAN 5.0 FEET AWAY FROM THE TREE TRUNK.
OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACTED ONTO PUBLIC
2. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER-LAPPED BY SIX INCHES AND FOLDED. RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY. NOTES: ON APPROVAL OF THE STAKEOUT, POSTS SHALL BE SECURELY DRIVEN ON 6.0 FOOT-MAXIMUM CENTERS, NORMAL
FILTER CLOTH SHALL BE EITHER FILTER X, MIRAFI 100X, STABILINKA T140N, OR APPROVED EQUIVALENT. TO THE GROUND, TO A DEPTH 1/3 OF THE TOTAL POST LENGTH. PLASTIC BARRIER FENCE SHALL BE PLACED ALONG
8. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON A AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN CONTRACTOR SHALL INSPECT AND MAINTAIN SILT SOCK AS NEEDED DURING THE DURATION OF THE SIDE OF ALL POSTS. ENDS OF FENCING SEGMENTS SHALL OVERLAP A DISTANCE OF AT LEAST ONE HALF THE
3. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE. APPROVED SEDIMENT TRAPPING DEVICE. CONSTRUCTION PROJECT. FENCE HEIGHT.
9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. CONTRACTOR SHALL REMOVE SEDIMENT COLLECTED AT THE BASE OF THE SILT SOCK WHEN IT FENCING SHALL BE SECURED TO POSTS WITH WIRE OR CABLE TIES AT TOP, MIDDLE AND BOTTOM OF POST.
HAS REACHED21 OF THE EXPOSED HEIGHT OF THE SILT SOCK. ALTERNATIVELY, RATHER THAN FASTENER SHALL BE TIGHT ENOUGH TO PREVENT THE FENCING FROM SLIPPING DOWN. OVERLAPS SHALL ALSO BE
SECURELY FASTENED.
CREATE A SOIL DISTURBING ACTIVITY, THE ENGINEER MAY CALL FOR ADDITIONAL SILT SOCK DRAWING NAME:
6 FOOT MIN
TO BE ADDED AT AREAS OF HIGH SEDIMENTATION, PLACED IMMEDIATELY ON TOP OF THE
SILT FENCE DETAIL EXISTING SEDIMENT LADEN SILT SOCK. BARRIER FENCE WHICH IS NOT ORANGE IN COLOR SHALL BE FLAGGED AT 6.0 FOOT INTERVALS WITH RED OR ORANGE
FLORESCENT TAPE. WARNING SIGNS SHALL BE MOUNTED ON THE FENCE AT NO MORE THAN 100 FOOT INTERVALS. Demolition &
NOT TO SCALE SILT SOCK SHALL BE OVERLAPPED 12" AT JOINTS AND STAKED ON EACH SIDE OF THE SOCK AT
A 45° ANGLE MAINTENANCE SHALL COMMENCE IMMEDIATELY AFTER ERECTION OF THE FENCE AND CONTINUE UNTIL ONE Erosion Control
STABILIZED CONSTRUCTION ENTRANCE DETAIL WEEK PRIOR TO ACCEPTANCE OF THE CONTRACT, AND SHALL CONSIST OF: REPLACING DAMAGED POST(S) AND
FENCING; RE-FASTENING AND TIGHTENING FENCING; AND RESTORING FENCE TO ITS INTENDED HEIGHT. Details
NOT TO SCALE
SILT SOCK DETAIL FENCING USED FOR TREE OR OTHER VEGETATION PROTECTION SHALL NOT BE TEMPORARILY REMOVED TO ALLOW
NOT TO SCALE EQUIPMENT ACCESS OVER A PROTECTED AREA, EXCEPT AS REQUIRED FOR ITEMS OF WORK SPECIFICALLY SHOWN
ON THE PLANS AND APPROVED BY THE ENGINEER IN WRITING. Date: 07/20/26
Drawn By: C. Wood
BEYOND DRIPLINE
Scale: As Noted
DRAWING NO.
TREE PROTECTION DETAIL
NOT TO SCALE
C-004
Project No: 24-4113
Page 1047 of 1174
Page 1048
SITE DATA
SITE AREA = 56 AC ±
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
ZONED: C-2(S)
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
(SHEET C-102) BUILDINGS: PROP. 382,848 SF COMMERCIAL,
Greensboro
EX. 92,264 SF TOPS MARKET, EX. 7,980 SF OFFICE
(DESIGNED
(TOTAL 483,092 SF)
BY OTHERS)
RS)
TH E
(SHEET C-101) SETBACKS - BUILDING REQUIRED
FRONT 40 FT
YO
02)
SIDE 5 FT
NS B
(C-1
(SHEET C-103) SIDE (IF USED FOR INGRESS/EGRESS) 25 FT
Utica
(PLA
REAR (ABUTTING COMM/RES) 10 FT/30 FT
LINE
LINE
SHEET LOCATION MAP
CH
SETBACKS - PARKING
CH
MAT
FRONT N/A
Buffalo
MAT
SIDE (ABUTTING RES) 10 FT
SCALE: N.T.S. REAR 10 FT
MAX. BUILDING HEIGHT
ST
40 FT
OP
OP
PARKING CALCULATION
ST
15
GREATER THAN 400,000 AND LESS THAN 600,000 SQUARE FEET OF GROSS FLOOR AREA
20
REQ'D = 4.75 SPACES FOR EACH 1,000 SQUARE FEET OF GROSS FLOOR AREA
24
REQ'D = 483,092 / 1,000 x 4.75
2,295
= SPACES REQ'D
25
25
25 FUT PARKING PROVIDED2,382
= SPACES PROVIDED
25 URE
1
80,3 -STOR
00 S Y RE
28 P
29 O
ST
.F. TAIL
WV
29 DN
29
29
NOTE:
29
29
FUTURE DEVELOPMENT AREAS SHOWN DN
29
ON THIS PLAN SET ARE CONSIDERED
West Seneca Exchange
29
29
TO BE CONCEPTUAL ONLY.
18
28 WV
29
Slade Ave, Ridge Rd & Orchard Park Rd
28 29
13
28
29
13 28 29
13
WHO PROPO
13
16 29
29
LE SED
158 SALE R
-BW
13
-BW
76
,000 ETA
-BW
76
-BW
76
STOP
SF IL
76
STOP
13
MATCH LINE (C-102) 8
NOTE:
IO
MATCH LINE (C-101) OFFSITE IMPROVEMENTS SHOWN DESIGNED BY
PAT
West Seneca New York
FUT
UR OTHERS. REFER TO OFFSITE PLANS BY OTHERS
STOP 130 E RETA
9,10 'x70' IL
STOP
FU 8
0 SF
RES TURE D
10
STOP
TAU RIVE
© CARMINA WOOD DESIGN
N
IO
8 UT
RAN -TH WV CA
IO
T 4, RU
CA
PAT
963
UT
IO
SF
N
STOP
13
N
IO
UT
CA
STOP CA
UT
IO
N
STOP
STOP S
TOP
9
7
CA
UT
FU
IO
N
2,50 TURE
N
IO
UT
0
CA
BAN G.S.F.
5 STOP FU WV
K 27 RES TURE D N
IO
UT
TAU RIV
CA
16
11
RAN E-TH
9 T 2, RU WV
380
STOP
5
12 STOP SF
WV
CA
UT
IO
N
STOP
STOP
5
CA
13
UT
STOP
IO
STOP
N
STOP 29
N
IO
UT
CA
FU
REST TURE D
STOP
6 AUR RIVE STOP
ANT -THR
, 2,3 U
00 S
CA
F
UT
IO
N
N
IO
STOP
UT
CA
25
STOP
5
STOP STOP 15
STOP
Date
621
23 23
21
CA
22
UT
IO
N
CA
UT
IO
N
N
IO
UT
19
CA
19
N
STOP
IO
UT
CA
17
16 18
STOP
STOP 17
STOP
13
CA
15
UT
12
IO
14
N
STOP
STOP
N
IO
UT
CA
12
PROPOSED STORMWATER
MANAGEMENT AREA
ONLY
FU
No. Description
ONLY
STOP STOP STOP STOP 2,92 TURE
STOP 5
RET G.S.F.
STOP STOP STOP STOP STOP
AIL
REVISIONS:
STOP
STOP
5
STOP
STOP
STOP
STOP
4
STOP
14
18
FU
RES TURE D
TAU RIV
STOP
FUTURE RETAIL FUTURE RETAIL FUTURE RETAIL
RAN E-TH
T 2, RU
MAT
STOP
110'x200' FUTURE RETAIL 380
SF
CH
110'x200' 110'x200'
22,000 SF 22,000 SF
110'x200' 10
12
NOTE: STOP 10
MAT LINE
22,000 SF 22,000 SF
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN
9
CH (PLA
LINE NS B
NOTE: FUTURE SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. (C-1 YO
RESTAURANT FUTURE RETAIL FUTURE RETAIL 03) THE
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN
100'x100' 100'x100' 100'x100' 13 RS)
SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. 10,000 SF EX. OFFICE
10,000 SF 10,000 SF 7,980 SF
10 10
STOP 10 10
STOP
Sealed 07/20/2026
STOP
(C-1 )
01
03)
(C-1
LINE
SITE PLAN
LINE
GENERAL NOTES:
SITE LEGEND
CH
CH
MAT
1. INSTALL ALL MATERIALS TO MANUFACTURER'S RECOMMENDATIONS AND BEST STANDARDS OF TRADE INVOLVED.
MAT
PROPERTY LINE
SCALE: 1"=100' 2. SUBSTITUTIONS SHALL BE MADE ONLY WITH OWNER'S APPROVAL AND BE OF EQUIVALENT QUALITY TO WHAT IS SPECIFIED.
3. WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH ALL LOCAL CODES AND OSHA SAFETY RULES AND REGULATIONS.
DRAWING NAME:
SITE NOTES: PROPOSED CONCRETE CURB
1. ALL RADII SHALL BE 3'-0" UNLESS OTHERWISE NOTED. 4. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AT THE SITE. NOTIFY OWNER & ENGINEER OF DISCREPANCIES IN CONDITIONS SHOWN ON DRAWINGS Site Plan
PRIOR TO PROCEEDING WITH THE WORK. PROPOSED SIDEWALK / CONCRETE PAD
2. ALL DISTURBED AREAS: SHALL HAVE 4" MIN. OF TOPSOIL AND SEED. Overall
5. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ANY EXISTING STRUCTURES TO REMAIN AND ANY FINISH MATERIAL INSTALLED WHILE
3. ALL DIMENSIONS FROM PROPERTY LINES SHALL BE MEASURED PERPENDICULAR TO THE WORKING ON OTHER COMPONENTS. NUMBER OF PARKING SPACES
PROPERTY LINE.
27
6. CONTRACTOR SHALL KEEP JOB FREE OF DEBRIS AND MAKE FINAL CLEANUP TO SATISFACTION OF OWNER.
4. BUILDING DIMENSIONS ARE APPROXIMATE, REFER TO ARCHITECTURAL DRAWINGS FOR PROPOSED SIGN
LAYOUT DIMENSIONS. 7. CONTRACTOR SHALL ASCERTAIN THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION SO THAT THIS WORK WILL NOT DISTURB EXISTING LINES Date: 07/20/26
AND/OR INSTALLATIONS. COORDINATE ALL WORK WITH THE APPLICABLE UTILITY COMPANIES. PROPOSED STANDARD DUTY Drawn By: C. Wood
5. ALL HANDICAP RAMPS (NOT WITHIN THE NYSDOT R.O.W.) AND/OR SIDEWALKS FLUSH TO ASPHALT PAVEMENT Scale: As Noted
PAVEMENT SHALL HAVE ADA COMPLIANT TACTILE WARNING STRIPS WHERE ENTERING 8. ALL OTHER PERMITS REQUIRED BY STATE
NEWOFYORK,COUNTY OFERIE, ANDTOWN OFWEST SENECAARE THE RESPONSIBILITY OF THE
PARKING AREAS/DRIVEWAYS. SIDEWALKS FLUSH TO PAVEMENT WITHIN THE NYSDOT R.O.W. CONTRACTOR/DEVELOPER/OWNER. PROPOSED LIGHT POLE DRAWING NO.
SHALL ADHERE TO THE NOTES AND DESIGN REGULATIONS AS STATED ON NYSDOT STANDARD
9. EXISTING CURB AND REMOVAL OF EXISTING ENTRANCE SHALL BE SAW CUT FULL-DEPTH AND NEATLY REMOVED FROM THE BACKSIDE, EXISTING
C-100
SHEET 608-01.
PAVEMENT SHALL NOT BE DISTURBED AND THE PAVEMENT EDGE SHALL BE USED AS FORM FOR PLACING NEW CURB.
6. EXISTING TREE LOCATIONS ARE APPROXIMATE, CONTRACTOR TO LOCATE LOCATIONS PRIOR NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
TO CONSTRUCTION AND COORDINATE WITH OWNER WHICH TREES SHALL BE REMOVED AND10. ALL DISTURBED AREAS WITHIN NYSDOT R.O.W. TO BE RESTORED USING ITEM 610.1402 TOPSOIL - ROADSIDE AND ITEM 610.1602 TURF ESTABLISHMENT
CARMINA
-
WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
WHICH SHALL REMAIN AND BE PROTECTED DURING CONSTRUCTION. LAWNS AND COMPLY WITH NYSDOT STANDARDS AND SPECIFICATIONS SECTION 713 - LANDSCAPE DEVELOPMENT MATERIALS.
100 0 100 200Ft. Project No: 24-4113
11. ANY NYS RIGHT OF WAY DAMAGES CAUSED BY OR DURING CONSTRUCTION TO FEATURES TO REMAIN SHALL BE REPAIRED OR REPLACED PER MOST
CURRENT NYSDOT STANDARDS AND SPECIFICATIONS AT THE CONTRACTOR'S EXPENSE. 100'
Page 1048 of 1174
Page 1049
8
5
MATCHLINE (C-102) 7 2
1
MATCHLINE (C-101) 12.0 NOTE:
IO
'
12.0 FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN
PAT
' 5
12.0
FUT
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
36.0 SET ARE CONSIDERED TO BE CONCEPTUAL ONLY.
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
' '
URE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
(SHEET C-102) TYP. 4
Greensboro
130 RETA
NOTE: TOP 5
(DESIGNED FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN 6 S
9,10 'x70' IL
SET ARE CONSIDERED TO BE CONCEPTUAL ONLY.
STOP
BY OTHERS) 1
CURRENT FU 8
0 SF
RES TURE D
10 3
2
STOP
SHEET TAU RIVE R25'
1
8
RAN -TH 3
IO
T 4, RU 1 7
PAT
(SHEET C-103) 963 7
SF
Utica
8
STOP
13 R25'
3 2
R25
5.0' 3
R25'
'
5 STOP
SHEET LOCATION MAP 6.0'
STOP
STOP 6
5
1
S
Buffalo
12.0
'
TOP 5 5.0' 5
SCALE: N.T.S. 12.0 4 TYP. 4 MAT
4 '
12.0 7 9 CHL 1 12.0
'
12.0 1 INE '
12.0 1
48.0 ' 5.0' '
6 '
4 7
FU 1 TYP.
2,50 TURE
5
5 4
1
'
24.0
TYP.
0 G. 5 STOP 12.0 R15'
4
6
FU
BAN S.F.
1 '
TYP. 5
RES TURE D
24.0
'
'
33.0
16 K 11
3 8 27
TAU RIV
R6
'
1 RAN E-TH PROPOSED ENTRANCE TO
ADJACENT SITE. COORDINATE
7 7 9 T 2, RU WITH OFFSITE DEVELOPMENT
380
STOP
5 5
2 12 5 STOP PLANS BY B.L. COMPANIES
SF
2 3
R4'
STOP
5 12. 10. 4 TYP.
4 0' 41'
R25'
3
STOP
PROPOSED DRIVEWAY 1 NOTE:
IMPROVEMENTS CONTINUE
TYP. NOTE: R4' 5 5 ' 8 OFFSITE IMPROVEMENTS SHOWN
1 6 R2 13
OFFSITE. REFER TO 8 FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN 4 STOP ' DESIGNED BY OTHERS. REFER
OFFSITE PLANS BY OTHERS. SET ARE CONSIDERED TO BE CONCEPTUAL ONLY.
8
STOP 3
2 R25 TO OFFSITE PLANS BY OTHERS
4 STOP 1 29
West Seneca Exchange
7 6 5
TYP. 1 8
R15
R25'
5
FU
'
7 1
12.0
4
0'
RES TURE D
5
STOP
160
°' 4 7
' 7
CONNECT PROPOSED SIDEWALK TO NEW SIDEWALK SHOWN
12.0 TYP.
6 TAU RIV STOP
RAN E-TH
Slade Ave, Ridge Rd & Orchard Park Rd
WITHIN ORCHARD PARK ROAD. REFER TO OFFSITE PLANS BY 4 6 1
6
T, 2 RU
6.0
'
3
12.0
OTHERS. TYP. 4 TYP.
'
'
,300
24.0
4 PROPOSED ENTRANCE TO
1
R3'
R15'
ADJACENT SITE. COORDINATE
SF
'
12.0
5.0'
3 5 5 WITH OFFSITE DEVELOPMENT
1 6 PLANS BY B.L. COMPANIES
5 2
1
3
STOP 2
R20'
1 5
5.0'
4 25
STOP
5
STOP
R198
TYP.
ORCHARD PARK ROAD IMPROVEMENTS SHOWN DESIGNED BY STOP 15 4
STOP
5 NOTE: 5
'
OTHERS. REFER TO OFFSITE PLANS BY OTHERS 5 TYP.
615
1 FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN
23 23
21
SET ARE CONSIDERED TO BE CONCEPTUAL ONLY.
West Seneca New York
22
1
1
19
© CARMINA WOOD DESIGN
19 6
STOP 4 TYP.
17
16 18 1 5
STOP
5
STOP 17
STOP
13
12 15
14
STOP
STOP
1
12 24.0
' PROPOSED STORMWATER
6
DETAIL LEGEND
MANAGEMENT AREA
1 TYPE "A" CONCRETE CURB
Date
4
TYP. 2 HEAVY DUTY ASPHALT
5 3 STOP BAR
1
4 PAINTED TRAFFIC ARROWS
STOP STOP 5 LIGHT POLE FOUNDATION
STOP STOP 1
STOP STOP 6 CONCRETE SIDEWALK
STOP STOP STOP 7 CONCRETE SIDEWALK RAMP
No. Description
8 CROSSWALK STRIPING
STOP
9 EXTERIOR CONCRETE SLAB ON GRADE
REVISIONS:
STOP
R124'
STOP
STO
1 NOTE LEGEND
5 R10 P 0' STOP
1 INSTALL STOP SIGN - M.U.T.C.D. SIGN NO. R1-1B
14 2 RUNOUT CURB IN 2' OR MATCH EXISTING CURB
1)
18
C-10
3 SAWCUT LINE, MATCH EXISTING EDGE OF PAVEMENT
(
4" WIDE DOUBLE YELLOW PAVEMENT STRIPE @ 4" SPACING
STOP
4
FUTURE RETAIL
INE
1
FUTURE RETAIL FUTURE RETAIL
STOP
CHL
FUTURE RETAIL 6 24.0' 5 4" WIDE YELLOW PAVEMENT STRIPE
)
110'x200'
-103
Sealed 07/20/2026
110'x200'
MAT
110'x200' 110'x200' R100' 10 6 18" WIDE WHITE PAVEMENT STRIPE
E (C
22,000 SF 22,000 SF 22,000 SF 5
12
10 7
4" WIDE YELLOW PAVEMENT STRIPES
@ 2' O.C. & @ 45° TO PARKING LINES
HLIN
22,000 SF 8 LANDSCAPED AREA - SEE LANDSCAPE PLAN,
C
IF NO PLANTINGS, INSTALL TOPSOIL & SEED
MAT
NOTE:
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN
SET ARE CONSIDERED TO BE CONCEPTUAL ONLY.
2 4 TYP.
FUTURE
RESTAURANT FUTURE RETAIL SITE LEGEND FUTURE RETAIL
168°'
NOTE:
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN
TYP. 4
100'x100' 100'x100' SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. PROPERTY LINE
100'x100'
1
10,000 SF 10,000 SF 10,000 SF
PROPOSED CONCRETE CURB
6 DRAWING NAME:
36.0'
5 10 10 PROPOSED SIDEWALK / CONCRETE PAD
12.0' 12.0' 12.0'
STOP 10
STOP 10 Site Plan
5
1 NUMBER OF PARKING SPACES
27
4 TYP.
PROPOSED SIGN 9 PROPOSED SIGN
6
PROPOSED STANDARD DUTY
16.0'
ASPHALT PAVEMENT Date: 07/20/26
R30 ' Drawn By: C. Wood
' R30 PROPOSED LIGHT POLE
CONNECT PROPOSED SIDEWALK TO NEW SIDEWALK SHOWN Scale: As Noted
SLADE DRIVE IMPROVEMENTS SHOWN DESIGNED BY OTHERS. WITHIN SLADE AVENUE. REFER TO OFFSITE PLANS BY OTHERS.
REFER TO OFFSITE PLANS BY OTHERS SLADE DRIVE IMPROVEMENTS SHOWN DESIGNED BY OTHERS. DRAWING NO.
REFER TO OFFSITE PLANS BY OTHERS
SITE PLAN
PROPOSED DRIVEWAY IMPROVEMENTS CONTINUE
C-101
OFFSITE. REFER TO OFFSITE PLANS BY OTHERS. NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
SCALE: 1"=40' 40 0 40 80Ft.
40' Project No: 24-4113
Page 1049 of 1174
Page 1050
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
CURRENT
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
SHEET
(DESIGNED
BY OTHERS)
(SHEET C-101)
(SHEET C-103)
Utica
SHEET LOCATION MAP
Buffalo
S T
SCALE: N.T.S.
OP
OP
ST
15
PROPOSED ENTRANCE TO ADJACENT SITE. COORDINATE
WITH OFFSITE DEVELOPMENT PLANS BY B.L. COMPANIES
20
24
25
25
West Seneca Exchange
FUT
25
25 URE
Slade Ave, Ridge Rd & Orchard Park Rd
1
80,3 -STOR
00 S Y RE
2 28 P
29 O
ST
.F. TAIL
29 DN
29
29
29
West Seneca New York
1 29
29
© CARMINA WOOD DESIGN
R50'
8
29
1 29
R74'
1
R6'
18 R6'
8 28 WV
1 29
28 29
PROPOSED CURBED ISLANDS TO BE INSTALLED AT
END OF EX. PARKING ROWS AS SHOWN, TYP. FOR
R6'
ALL SHOWN. THIS PORTION OF SITE WORK TO BE
R6'
8
INCLUDED WITHIN INITIAL ROADWAY DESIGN.
DETAIL LEGEND
4'
1 TYPE "A" CONCRETE CURB
R6
13
Date
' 2 HEAVY DUTY ASPHALT
R40 28 29
13 28 3 STOP BAR
29
13
1 4 PAINTED TRAFFIC ARROWS
7 R15' 5
NOTE:
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN 8 29 5 LIGHT POLE FOUNDATION
16 3
)
SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. 13 1 29
ERS
5.0' CONCRETE SIDEWALK
-BW
13 6
-BW
76
OTH
R6'
7 CONCRETE SIDEWALK RAMP
-BW
2 R6'
76
6 6.0' 3
-BW
8
R25
76
STOP
No. Description
1 8 CROSSWALK STRIPING
Y
'
12.0
)
76
' STOP
'
NS B
-102
12.0
1 1 2.0' 9 EXTERIOR CONCRETE SLAB ON GRADE
REVISIONS:
R6'
R6'
(PLA
E (C
1
13 8
IN
NOTE LEGEND
INE
CHL
R6'
4 TYP.
CHL
MAT
8 INSTALL STOP SIGN - M.U.T.C.D. SIGN NO. R1-1B
5 1
MAT
MATCHLINE (C-102) 7 2
RUNOUT CURB IN 2' OR MATCH EXISTING CURB
1 2
MATCHLINE (C-101) 12.0 NOTE:
IO
' SAWCUT LINE, MATCH EXISTING EDGE OF PAVEMENT
12.0 FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN 3
PAT
' 5
36.0
'
12.0
'
FUT SET ARE CONSIDERED TO BE CONCEPTUAL ONLY.
4" WIDE DOUBLE YELLOW PAVEMENT STRIPE @ 4" SPACING
TYP. 4 URE 4
130 RETA
NOTE: P 5
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN 6 STO 5 4" WIDE YELLOW PAVEMENT STRIPE
9,10 'x70' IL
SET ARE CONSIDERED TO BE CONCEPTUAL ONLY.
STOP
Sealed 07/20/2026
1 18" WIDE WHITE PAVEMENT STRIPE
FU 8
0 SF 6
RESTTURE D
10 3
2
4" WIDE YELLOW PAVEMENT STRIPES
STOP
AUR RIVE- R25'
1
8 7 @ 2' O.C. & @ 45° TO PARKING LINES WV
ANT THR 3
IO
4,96 U 1 7 LANDSCAPED AREA - SEE LANDSCAPE PLAN,
CA
PAT
7 8
UT
3 SF IF NO PLANTINGS, INSTALL TOPSOIL & SEED
IO
N
8
STOP
13 R25'
3 2
N
R25
IO
5 .0 ' 3
UT
R25'
'
CA
5 STOP
STOP 5
SITE LEGEND
6.0' S TO P 6
1
12.0
'
STOP 5 5.0' 5
12.0 4 TYP. 4 PROPERTY LINE
4 ' 7 9 1 12.0
12.0 '
' 1 12.0 1
48.0 12.0 5.0' '
6 ' '
4 7
CA
PROPOSED CONCRETE CURB
UT
FUT
IO
1 TYP.
N
DRAWING NAME:
2,50 URE
5
5 4
N
1
'
IO
24.0
PROPOSED SIDEWALK / CONCRETE PAD
UT
TYP.
0 G. Site Plan
CA
R15' 4
5 STOP 12.0 6
FUT
BAN S.F.
1 ' TYP. 5 24.0
RES URE D
'
'
33.0
K 11
3 8 27
TAU RIV NUMBER OF PARKING SPACES
27
R6
'
1 RAN E-TH PROPOSED ENTRANCE TO
ADJACENT SITE. COORDINATE
7 9 T 2, RU WITH OFFSITE DEVELOPMENT
WV
380
STOP
5 5 PROPOSED SIGN
5 STOP PLANS BY B.L. COMPANIES
SF
2 3 PROPOSED STANDARD DUTY
ASPHALT PAVEMENT
R4'
STOP
12. 10.
41'
4 TYP. Date: 07/20/26
0'
R25'
STOP
1 NOTE: Drawn By: C. Wood
NOTE: R4' 5 5' 8 OFFSITE IMPROVEMENTS SHOWN PROPOSED LIGHT POLE
6 R2 13 Scale: As Noted
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN 4 3 STOP ' DESIGNED BY OTHERS. REFER
SET ARE CONSIDERED TO BE CONCEPTUAL ONLY.
8
STOP 2 R25 TO OFFSITE PLANS BY OTHERS
DRAWING NO.
STOP 1 29
5
1
SITE PLAN
8
R15
R25'
C-102
5
FU 7 1 NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
0'
RES TURE D
STOP
160
°' 4 7 CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
7 TYP.
6 TAU RIV STOP
4 6 1 RAN E-TH SCALE: 1"=40' 40 0 40 80Ft.
T, 2 RU
6.0
TYP. 3
4 TYP. 40'
'
'
,300
24.0
4
1 PROPOSED ENTRANCE TO Project No: 24-4113
R3'
ADJACENT SITE. COORDINATE
SF
5.0'
5 5 WITH OFFSITE DEVELOPMENT
1 6 PLANS BY B.L. COMPANIES
2 Page 1050 of 1174
Page 1051
STOP
NOTE:
5' 8 OFFSITE IMPROVEMENTS SHOWN
CA
R2 13
UT
DESIGNED BY OTHERS. REFER
IO
'
R25
N
2 TO OFFSITE PLANS BY OTHERS
MAT
5
CHL
N
IO
UT
INE
CA
8
MAT
R25'
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
7 1
(C-1
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
(SHEET C-102) CHL 02 )
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
7
INE
Greensboro
STOP (C-1
3 (DESIGNED TYP. 01) MAT
4 CHL
'
24.0
4
1 BY OTHERS) PROPOSED ENTRANCE TO
INE
ADJACENT SITE. COORDINATE
MAT
CA
(BY
5.0'
NOTE:
UT
WITH OFFSITE DEVELOPMENT
5
CHL
IO
OTH
N
OFFSITE IMPROVEMENTS SHOWN
(SHEET C-101) PLANS BY B.L. COMPANIES
INE DESIGNED BY OTHERS. REFER
(C-1 ERS TO OFFSITE PLANS BY OTHERS
N
)
IO
UT
03)
CA
R20'
CURRENT
5.0'
Utica
4 SHEET
TYP.
SHEET LOCATION MAP
CA
UT
Buffalo
IO
1
N
CA
UT
IO
1
N
SCALE: N.T.S.
N
IO
UT
6
CA
N
IO
UT
CA
4 TYP.
5
'
12.0
'
12.0
'
12.0
CA
UT
5.0'
IO
N
5.0'
N
IO
UT
CA
5
5
PROPOSED STORMWATER 1 4 TYP.
PROPOSED ENTRANCE TO
ADJACENT SITE. COORDINATE
WITH OFFSITE DEVELOPMENT
MANAGEMENT AREA 6
PLANS BY B.L. COMPANIES
R20'
West Seneca Exchange
5
1
4
FUT
Slade Ave, Ridge Rd & Orchard Park Rd
2,92 URE
5 G.
RET S.F. STOP
AIL 5
5
1 SLADE DRIVE IMPROVEMENTS SHOWN DESIGNED BY OTHERS.
REFER TO OFFSITE PLANS BY OTHERS
4 TYP.
5
170
°' 4
West Seneca New York
NOTE: 5
'
STOP
STOP
12.0
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN 5
SET ARE CONSIDERED TO BE CONCEPTUAL ONLY.
'
12.0
4 5 5
© CARMINA WOOD DESIGN
1
STOP
'
12.0
18 4 TYP.
FU
'
12.0
RES TURE D 6
TAU RIV
STOP
RAN E-TH MAT
T 2, RU CHL
STOP
380 6
MAT INE
SF 1
CHL (BY
INE OTH
12 (C-1 ERS
10 STOP 9
EXISTING SIGN TO PROPOSED DRIVEWAY IMPROVEMENTS CONTINUE
03) )
REMAIN AND BE REUSED OFFSITE. REFER TO OFFSITE PLANS BY OTHERS.
CONNECT PROPOSED SIDEWALK TO NEW
DETAIL LEGEND
SIDEWALK SHOWN WITHIN SLADE AVENUE.
REFER TO OFFSITE PLANS BY OTHERS. 1 TYPE "A" CONCRETE CURB
FUTURE RETAIL
Date
RESTAURANT NOTE:
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN
FUTURE RETAIL 2 HEAVY DUTY ASPHALT
10SET0'x 100' TO BE CONCEPTUAL ONLY.
ARE CONSIDERED
100'x100' 13 3 STOP BAR
10,000 SF EX. OFFICE 4 PAINTED TRAFFIC ARROWS
10,000 SF 7,980 SF 5 LIGHT POLE FOUNDATION
)
)
-103
-101
6 CONCRETE SIDEWALK
10 10
E (C
STOP 10 7 CONCRETE SIDEWALK RAMP
E (C
STOP 10
No. Description
CROSSWALK STRIPING
IN
8
IN
CHL
CHL
9 EXTERIOR CONCRETE SLAB ON GRADE
REVISIONS:
MAT
MAT
STOP
NOTE LEGEND
1 INSTALL STOP SIGN - M.U.T.C.D. SIGN NO. R1-1B
2 RUNOUT CURB IN 2' OR MATCH EXISTING CURB
SLADE DRIVE IMPROVEMENTS SHOWN DESIGNED BY OTHERS.
REFER TO OFFSITE PLANS BY OTHERS
3 SAWCUT LINE, MATCH EXISTING EDGE OF PAVEMENT
4 4" WIDE DOUBLE YELLOW PAVEMENT STRIPE @ 4" SPACING
5 4" WIDE YELLOW PAVEMENT STRIPE
Sealed 07/20/2026
6 18" WIDE WHITE PAVEMENT STRIPE
4" WIDE YELLOW PAVEMENT STRIPES
7 @ 2' O.C. & @ 45° TO PARKING LINES
LANDSCAPED AREA - SEE LANDSCAPE PLAN,
8 IF NO PLANTINGS, INSTALL TOPSOIL & SEED
SITE LEGEND
PROPERTY LINE
PROPOSED CONCRETE CURB
DRAWING NAME:
PROPOSED SIDEWALK / CONCRETE PAD
Site Plan
NUMBER OF PARKING SPACES
27
PROPOSED SIGN
PROPOSED STANDARD DUTY
ASPHALT PAVEMENT Date: 07/20/26
Drawn By: C. Wood
PROPOSED LIGHT POLE Scale: As Noted
DRAWING NO.
SITE PLAN NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
C-103
SCALE: 1"=40' 40 0 40 80Ft.
40' Project No: 24-4113
Page 1051 of 1174
Page 1052
12" #3 DOWEL @ 24" O.C.,
LOCATE AT MID-POINT OF
DEPTH OF SIDEWALK, EMBED 4" FINISH GRADE 1" BELOW TOP OF CURB IN ALL LAWN
6" INTO CURB 6" AREAS. TOP OF SOD TO BE FLUSH WITH TOP OF CURB
AS SHOWN
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
1" 5" 1" 5"
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
1" RADIUS SIDEWALK, SEE DETAIL 1" RADIUS
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
SOD
Greensboro
PAVING AS PAVING AS SEE PAVEMENT WIDTH VARIES SEE SITE PLAN
6"
6"
SPECIFIED SPECIFIED 4" LAYER TOPSOIL TRAFFIC REFLECTIVE PLAN
SIDEWALK SUBBASE STOP SIGN -
2'-0"
1'-6"
1'-6"
WHITE PAINT 6" CONCRETE SLAB (MIN. 4000 PSI)
1'-0"
1'-0"
TACK COAT PRIOR TO M.U.T.C.D. SIGN
TACK COAT PRIOR TO CONTROL JOINTS @ 10' O.C. BOTH WAYS. SEAL
PAVING NO. R1-1 ALL JOINTS WITH ASPHALT CEMENT, NYSDOT
PAVING SPECIFICATIONS 702-0700
4'-0"
3,500 PS1 CONCRETE 3,500 PS1 CONCRETE 1'-6" 2'-0" 6"x6" 10/10 WELDED WIRE FABRIC
CENTER LINE TWO LANE PAVEMENT
PAVEMENT ELEVATION & PAVEMENT ELEVATION & DIMENSION STOP BAR (3" BELOW TOP OF SLAB)
DIMENSION REFER TO THIS POINT REFER TO THIS POINT
STOP X X X X X X X
Utica
8'-0"
MIN 6" STONE MATERIAL UNDER CURB MIN 6" STONE MATERIAL UNDER CURB 8" SUBBASE COURSE
TYPE 2 (N.Y.S.D.O.T. ITEM 304.12) TYPE 2 (N.Y.S.D.O.T. ITEM 304.12) MATERIAL, TYPE 1
FACE OF CURB OR (NYSDOT ITEM 304.11)
EDGE OF PAVEMENT,
ABUTTING SIDEWALK ABUTTING LANDSCAPE/GRASS SEE PLAN GRADED AND COMPACTED PAVEMENT SUBGRADE
Buffalo
NOTES: 51/2" 1'-8"
(TYP) NOTE: CONCRETE PAVEMENT MATERIAL SHALL CONFORM TO NYSDOT
1. CONTROL JOINTS TO BE 2" DEEP AT 15'-0" O.C. - SEE SPECIFICATIONS FOR FURTHER JOINT REQUIREMENTS NYSDOT 702-0700. 8'-5" STANDARD SPECIFICATION 501 AND CONSTRUCTION METHODS
2. WHERE THE CURB DROPS (IS FLUSH WITH ASPHALT) THE DEPTH OF CURB BELOW GRADE SHALL BE INCREASED TO 1'-6" AND CENTERED IN LANE SHALL CONFORM TO NYSDOT STANDARD SPECIFICATION 502-3.
OTHER DIMENSIONS ADJUSTED ACCORDINGLY. SEE PLAN
EXTERIOR CONCRETE
TYPE "A" CONCRETE CURB - 1 STOP BAR DETAIL - 3 SLAB-ON-GRADE SECTION - 9
NOT TO SCALE NOT TO SCALE
NOT TO SCALE
PAVEMENT WIDTH VARIES SEE SITE PLAN
1" ASPHALT TOP COURSE, TYPE 7 2'-0"
(N.Y.S.D.O.T. ITEM 403.18) TYP. NOTE:CROSS SLOPE WITHIN
3" ASPHALT BINDER COURSE, TYPE 3 NEW CONCRETE (MIN. 3,500 PSI) NYSDOT R.O.W. IS 1.5% MAX.
TYP.
(N.Y.S.D.O.T. ITEM 403.13) EXPANSION JOINT SIDEWALK - 4" MIN. THK.
2'-0"
1/2 " RECESS DRIVEWAY - 6" MIN THK. W/W.W.F.6X6/10X10 B A
5'-0"
10" SUBBASE COURSE MATERIAL, TYPE 1 1'R SLOPE
(N.Y.S.D.O.T. ITEM 304.02) EXISTING SIDEWALK GRASS AREA
4'-0"
1/4 "/FT. CURB 50% - 65% of
3'R base dia. CURB
1:1
West Seneca Exchange
PAVEMENT EXPANSION JOINT
2
TACTILE WARNING 1:12 1/2 " RECESS
5'-0" 4'-0" FIELD, COLOR TO A
1'-0" CONTRAST WITH RAMP 1:12
NONWOVEN GEOTEXTILE TYP. 5'-0 B
FABRIC MIRAFI 600X OR FORM SUBBASE STONE SUBBASE MATERIAL MATERIAL "M
Slade Ave, Ridge Rd & Orchard Park Rd
0.9" IN.
0.2"
APPROVED EQUAL CROSS SECTION TYPE 2 (N.Y.S.D.O.T. ITEM 304.12)
MIN. 4" THK (SIDEWALK)
MIN. 6" THK (DRIVEWAY) DOME SECTION
GRADED AND COMPACTED PAVEMENT SUBGRADE PAINTED TRAFFIC ARROWS - 4 NOTES:
TO BE FLUSH WITH
EDGE OF PAVEMENT
NOT TO SCALE
1. CONTROL JOINTS TO BE AT 5'-0" O.C., BOTH WAYS WHERE APPLICABLE. SEE SPECIFICATIONS FOR FURTHER JOINT
NOTE: CONSTRUCTION METHODS FOR ASPHALT PAVEMENT SHALL REQUIREMENTS NYSDOT 702-0700. 2.35" 1" CURB
CONFORM TO NYSDOT STANDARD SPECIFICATION 401-3, WITH typ. HIGHWAY
dome (typ.) PAVEMENT RAMP
SUBBASE CONSTRUCTION METHODS CONFORMING TO NYSDOT SIDEWALK
2.35"
5' MIN. 2. CONCRETE SIDEWALK AND DRIVEWAY MATERIAL SHALL CONFORM TO NYSDOT STANDARD SPECIFICATION 501 AND
STANDARD SPECIFICATION 304-3. CONSTRUCTION METHODS SHALL CONFORM TO NYSDOT STANDARD SPECIFICATION 608-3.
6" CONCRETE (MIN. 3500 PSI) W/6X6
2'
3. SUBBASE GRADE SHALL FOLLOW THE PROPOSED GRADE OF THE SIDEWALK AND SLOPE AWAY FROM BUILDING WHERE 10/10 WWM 4" STONE SUBBASE
HEAVY DUTY ASPHALT SECTION - 2
West Seneca New York
APPLICABLE, PROVIDE CONTINUOUS STONE PATH TO CURB UNDERDRAIN WHERE PROVIDED. SECTION A-A
WHITE PAVEMENT
typ.
NOT TO SCALE PAINT
1"
4. FULL DEPTH EXPANSION JOINTS SHALL BE INSTALLED EVERY 20' O.C., BOTHWAYS WHERE APPLICABLE. SEE DOME SPACING 1:12 5'-0" MIN. 1:12
© CARMINA WOOD DESIGN
SPECIFICATIONS FOR FURTHER JOINT REQUIREMENTS NYSDOT 702-0700. PAVEMENT SURFACE
SIDE SLOPE RAMP SIDE SLOPE
NOTE: TACTILE WARNING
FIXTURE FURNISHED, 5. SEE CURB DETAIL FOR DOWLING REQUIREMENTS WHERE ABUTTING CURB. DEVICES SHALL BE PER ICC/ANSI
24"
INSTALLED AND WIRED BY ELECTRICAL A117.1-1998, SECTION 705.3.1.2 CURB
12"
CONTRACTOR. 6. INSTALL 6" LONG #3 DOWELS @ 12" O.C. WHERE SIDEWALK ABUTS A BUILDING WALL AT AN ENTRANCE, THICKEN SIDEWALK OR CURRENT UPDATE SECTION B-B
TO 6" AT BUILDING WALL AND INSTALL DOWEL CENTERED IN THE 6" DEPTH. DOWELS AND THICKENING OF SIDEWALK
SHALL EXTEND 18" EITHER SIDE OF ENTRANCE.
4" WHITE
7. INSTALL 1/2" PREMOLDED EXPANSION JOINT WITH BACKER ROD & SEALANT WHERE SIDEWALK ABUTS BUILDING OR OTHER
SIDEWALK CURB RAMP - 7
PAVEMENT NOT TO SCALE
STRUCTURE.
ELECTRICAL CONTRACTOR FURNISHED POLE STRIPE
4"x6" GASKET HAND HOLE 25' HEIGHT UNLESS OTHERWISE NOTED
ELECT. CONTRACTOR TO
CONNECT OR CADWELD
GROUND WIRE TO
FURNISHED AND INSTALL IN-LINE
BALLAST FUSES IN BUSSMANN
CONCRETE SIDEWALK - 6
"TRON" WEATHERPROOF FUSE NOT TO SCALE
1"x45° CHAMFER HOLDERS #HEB-AD WITH #KTK
ROUND FORMED CONCRETE
BASE 24" DIAMETER
FUSES (SIZE AS REQUIRED)
4 - 40"x1"Ø ANCHOR BOLTS
CROSSWALK STRIPING - 8
Date
NOT TO SCALE
#3 REINFORCING TIES
12" ON CENTER
SEE NOTE
FINISHED GRADE
#6 BARE GROUND WIRE
CADWELD CONNECTION
3'-0" MIN.
(BOTH ENDS)
6'-0" MIN. AND DOWN
3/4 "x10" COPPER WELD
TO SOLID BEARING
GROUND ROD (LIGHTING
PROTECTION)
CARLON PLASTIC CONDUIT
No. Description
3" COVER GALVANIZED STEEL TO CARLON
CONDUIT CONNECTOR
REVISIONS:
GALVANIZED CONDUIT "ELL"
4 - #8 VERTICAL
REINF. BARS
ALL CONCRETE WORK AND
REINFORCING SHALL BE 24" DIA.
BY SITE CONTRACTOR CONCRETE
BASE
NOTES:
1. FOR LOCATIONS OF FOUNDATIONS SEE SITE PLAN
2. FOR LIGHT FIXTURE ORDERING INFORMATION SEE SITE LIGHTING PLAN
3. LIGHT POLE BASE EXPOSURE ABOVE GRADE SHALL BE:
IN CURBED ISLANDS: 6" ABOVE TOP OF CURB ELEVATION
IN PAVEMENT: 3' ABOVE GRADE
IN NON-CURBED GRASS AREAS: 6" ABOVE GRADE
Sealed 07/20/2026
LIGHT POLE FOUNDATION - 5
NOT TO SCALE
DRAWING NAME:
Site Details
Date: 07/20/26
Drawn By: C. Wood
Scale: As Noted
DRAWING NO.
C-104
Project No: 24-4113
Page 1052 of 1174
Page 1053
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
(SHEET C-202)
Greensboro
(DESIGNED
BY OTHERS)
S )
HER
(SHEET C-201)
Y OT
(PLA )
NS B
02
(C-2
(SHEET C-203)
Utica
LINE
LINE
SHEET LOCATION MAP
CH
CH
MAT
Buffalo
MAT
SCALE: N.T.S.
ST
OP
O P
ST
618
617
FUT
617 617
URE 618
1
80,3 -STOR
618
619
619
P
00 S Y RE 617
62
O
0
ST
.F. TAIL
620 WV
620
DN
NOTE:
FUTURE DEVELOPMENT AREAS SHOWN DN
614
ON THIS PLAN SET ARE CONSIDERED
West Seneca Exchange
0
62
TO BE CONCEPTUAL ONLY.
620
615
620
WV
Slade Ave, Ridge Rd & Orchard Park Rd
616
0
62
619
WHO PROPO
88
LE SED
158 SALE R
-BW
17+
-BW
76
,000 ETA
-BW
76
-BW
76
620
STOP
SF IL
76
STOP 617 620
619
MATCH LINE (C-202)
00
618
618
618
17+
NOTE:
IO
MATCH LINE (C-201) OFFSITE IMPROVEMENTS SHOWN DESIGNED BY
PAT
West Seneca New York
FUT
8
61
UR OTHERS. REFER TO OFFSITE PLANS BY OTHERS
130 E RETA
ST
STOP
9,10 'x70' IL
STOP
618
617
FU 0 SF
RES TURE D
STOP
TAU RIVE
© CARMINA WOOD DESIGN
23+56
N
+26
IO
UT
RAN -TH WV
620
CA
ST
00
IO
T 4, RU
620
CA
PAT
963
UT
IO
0018
16+
SF
N
STOP
N
IO
UT
CA
STOP CA
18+
UT
IO
619
N
STOP
23+ ST
618
STOP
617
619
620
STOP 0 0
619
619
ST
CA
617 UT
FU ST ST
IO
N
620
2,50 TURE 22+
00
N
IO
UT
0
00
CA
BAN G.S.F.
STOP ST FU 620 WV
ST
RES TURE D
617
15+
618
K
N
IO
UT
TAU RIV
00
CA
RAN E-TH 619
10+ T 2, RU 620
619
21+
17+
62
WV 620
ST
0
380
STOP
00
7
00 STOP WV
61
SF
CA
ST UT
IO
N
STOP
620
617
619
STOP
11+0 ST
CA
620
UT
STOP
20+
IO
STOP
0 00
N
620
STOP
00
617
+
N
IO
14
UT
ST
CA
FU
REST TURE D
619
619 620
STOP
618
12+0
ST
AUR RIVE STOP
00
0 ANT -THR
, 2,3 U 19+
13+00
16+
617 7
616
61
00 S
00
CA
F
UT
IO
620
N
ST
619
N
IO
0
62
STOP
UT
CA
617
18+
STOP
STOP
00
62
STOP ST
0
STOP
615
Date
621
ST
ST
0
62
CA
618
ST
UT
IO
617 620
N
CA
UT
0
17+0
IO
616
N
615
N
0
IO
UT
0
CA
15+
N
STOP
IO
620
UT
CA
616
61
9
STOP
621
STOP
9
61
STOP
ST 16+
ST
0
616
ST
62
00
ST
CA
UT
0
62
IO
N
618
616
STOP
STOP
ST
620
ST
N
IO
621
UT
CA
617 622
15+
61
621 623
PROPOSED STORMWATER
9
620
ST
00
624
00
ST
ST
625
622
MANAGEMENT AREA
14+
626
ST
62 28
7
6
ST 623
ST
617
624
ST
14+ 625
00
62
618
5
626
ST
ONLY 62
FU
7
No. Description
ONLY
STOP STOP STOP STOP 2,92 TURE
5
62
STOP 6
RET G.S.F.
STOP STOP STOP 13+ 624 62
62
STOP 617 62 5
3
626
STOP
00
2
AIL
00
62
REVISIONS:
1
13+
625
ST
62
STOP
0
ST
61
ST
9
ST
STOP
61
ST
8
STOP ST ST 12+ 618
STOP 00
STOP
STOP
ST
ST
STOP
ST
ST
ST
11+
ST
FU
RES TURE D 00
ST TAU RIV
STOP
ST
12+00
FUTURE RETAIL FUTURE RETAIL FUTURE RETAIL
ST ST ST ST RAN E-TH
T 2, RU
MAT
STOP
ST ST
110'x200' FUTURE RETAIL 380
SF
CH
110'x200' 110'x200' 110'x200' 10 LINE
ST
22,000 SF MAT
ST
22,000 SF 22,000 SF NOTE: STOP
+0 (PLA
22,000 SF ST 0 CH
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN LINE NS B
NOTE: FUTURE SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. (C-2 YO
RESTAURANT FUTURE RETAIL FUTURE RETAIL 03) THE
ST FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN
100'x100' 100'x100' 100'x100'
RS)
ST
11+00
SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. 10,000 SF EX. OFFICE
ST 10,000 SF 10,000 SF 7,980 SF
ST
ST
ST ST ST ST STOP
ST ST ST ST STOP
Sealed 07/20/2026
ST ST ST ST ST ST ST
ST
STOP
10+00
(C-2 )
01
03)
(C-2
LINE
GRADING PLAN
LINE
PROPOSED GRADING LEGEND
CH
CH
MAT
101
MAT
PROPOSED CONTOUR
SCALE: 1"=100'
PROPOSED SPOT ELEVATION 100.80 DRAWING NAME:
TC 100.50
Grading Plan
PROPOSED TOP/BOTTOM OF CURB ELEV.
BC 100.00 Overall
PROPOSED CATCH BASIN CB
PAVEMENT/GROUND SLOPE
Date: 07/20/26
YD Drawn By: C. Wood
PROPOSED YARD DRAIN
Scale: As Noted
DRAWING NO.
PROPOSED MANHOLE MH
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,C-200
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
100 0 100 200Ft. Project No: 24-4113
100'
Page 1053 of 1174
Page 1054
BC 615.99
1.1%
MATCHLINE (C-202)
00
17+
MATCHLINE (C-201) CB 10
IO
ST
RIM 614.73
PAT
FUT
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
615
URE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
(SHEET C-202)
Greensboro
614.95
ST
130 RETA
615.39 TOP CB 11
(DESIGNED 5
61
S RIM 614.85
9,10 'x70' IL
STOP
BY OTHERS)
ST
FU TC 615.25 TC 617.24
CURRENT
RES TURE D BC 614.75 TC 615.64 0 SF BC 616.74
STOP
0. 9%
SHEET TAU RIVE BC 615.14 ST MATCH EX.
RAN -TH 23+56 CB 12
IO
T 4, RU CB 9 ST
RIM 614.76
PAT
963
26
RIM 613.85 TC 617.28
(SHEET C-203) SF CB 13 ST
18+
Utica
2.0%
00
STOP
616 BC 616.78
617
614.96
16+
RIM 614.75 MATCH EX.
ST
TC 616.86 STOP
SHEET LOCATION MAP
0
614.30 23+
STOP BC 616.36
0
ST
00
18+
STOP
615
614
STOP
Buffalo
ST
TC 616.62 MAT TC 616.55
ST
CBC
HLIN616.05 TC 616.83
SCALE: N.T.S. TC 614.33 TC 615.20 BC 616.12 ST
614 BC 613.83 BC 614.70 1.0% E BC 616.33
ST
616.73
ST
ST
616 615
0.7%
1. 3%
GV
ST
FU
ST
CB 7 22+ ST
00
2,50 TURE
616
616 ST
616
RIM 612.85
ST
ST CB 16
0 G.
ST
ST
LOW POINT: RIM 615.73 TC 616.44
613
STOP ST
2.0%
FU
BAN S.F. 613.53 613.30 CB 8 BC 615.94
RES TURE D
0
MATCH EX. ST HIGH POINT: ST
RIM 613.85
K
0
ST
15+
616.56
613
TC 616.66 616.40 TC 616.19 TAU RIV
6
616 CB 14
3
61
RAN E-TH
61
ST
2.0% BC 616.16 21+ 0.7% RIM 615.20 BC 615.69 ST CB 17
616.87 TC 616.66 T 2, RU
00
00
ST
RIM 615.73 380
STOP
613
TC 613.51 ST 616.84
17 +
617 BC 616.16 STOP
0.7%
TC 616.19 SF
BC 613.01 615
2.0%
10+ CB 6
ST
BC 615.69
00 ST
RIM 612.85 TC 615.66
STOP
615.94 ST
616
613
61 BC 615.16
STOP
ST
615 TC 613.49 6 ST
616.00 615.51
MATCH EX. BC 612.99 STOP ST 20+ TC 615.20
617.04 0.5% TC 615.79 CB 5 STOP CB 15
00
BC 614.70
11+0 BC 615.29 RIM 613.91 STOP ST 615.51 615.75
West Seneca Exchange
RIM 615.20 TC 615.66
ST
0 CB 1
2.0%
61
614
ST
ST
RIM 615.34 5 TC 614.00 0 BC 615.16
614.62 +0 FU 1.0% CB 18
14614.16
RES TURE D
STOP
BC 613.50 TC 615.51
615
ST
TC 616.68 RIM 614.38
ST
616 0.7% 615.00 TAU RIV BC 615.01 STOP TC 615.50
ST
BC 616.18 614 TC 615.20 615 5
RAN E-TH 161
Slade Ave, Ridge Rd & Orchard Park Rd
9+0 BC 615.00
% T, 2 RU 615.24 BC 614.70
2.1%
0.7 TC 614.18 0 TC 615.91
614
12+0 CB 2 CB 38
00
616 ,300
0 615
ST
BC 613.68 TC 615.51 BC 615.41
16+
RIM 614.45 RIM 615.03
SF
4.9%
ST
TC 615.50 TC 614.40 BC 615.01 LOW POINT: 6165 TC 615.68
0 15
BC 615.00 BC 613.90 13+0 TC 614.96 615 614.59 BC 615.18
TC 615.94 BC 614.46 CB 37
ST
613 1.1%
BC STO P
1:4.0
615.44 614.70 RIM 615.03 614
615
615
614 615
1.1%
ORCHARD PARK ROAD IMPROVEMENTS SHOWN
ST
CB 4 TC 614.95 614.80 18+
2.0% CB 19 00 TC 615.20
STOP
DESIGNED BY OTHERS. REFER TO OFFSITE RIM 613.70 ST HIGH POINT:
ST
STOP BC 614.45 615
PLANS BY OTHERS STOP RIM 614.38 613 615.80 BC 614.70
STOP
ST
ST CB 36 TC 615.05
615
TC 614.72
ST
0
RIM 614.04
1:4.
BC 614.22 ST
614.25 BC 614.55 616 TC 614.69
1:3
ST ST BC 614.19
West Seneca New York
2.0%
.0
CB 3 ST
CB 35 604 612 614
ST 1.0%
ST
616.19 17+0
616
608
RIM 614.25
605
ST RIM 614.04 0
608
607 606 615
© CARMINA WOOD DESIGN
TC 616.00
609
STOP 611
00
608.00
ST
1.4%
15+
TC 615.10 607.80 608.00 BC 615.50 TC 614.70
615
ST
ST
610
BC 614.60
ST
605
TC 615.10 BC 614.20
604
TC 615.20
STOP
BC 614.60 1:3.0 610
1.1%
STOP 2.0
606
BC 614.70
611
ST
%
615
STOP
ST
ST
07
ST
ST
608 6
ST
612
TC 615.49 609
ST 607.80 CB 21
BC 614.99
ST
0
1:3.
ST
TC 615.49 608.00
ST
ST
RIM 614.22
613
ST
1:6.
STOP
615
STOP 615.68 BC 614.99 7 607.80 614.88
ST 60 7 608
ST
614
ST
2.0%
ST
ST
ST
PROPOSED STORMWATER
615
1:3.
ST 608.00 607.80
606
0
ST
604
613
ST
608
MANAGEMENT AREA 601.80
ST
ST
1:3. 6
ST
00
HIGH POINT:
605
1.1% 607 60
1.0% 14+
615.23 605
0 04
ST
ST 6
7
2.0%
ST
1:4.0 608.00
1:6.
ST
615 BOTTOM OF 604
605
ST
608
Date
ST
1:3.0
ST
BASIN (TYP.) 607.80
607
ST ST
606 603
614
ST
602
ST
ST
CB 34
607
1:6.7
RIM 614.04 ST 606 605 604 603 602
614.25
ST
STOP STOP 614.71
1:4.0
STOP STOP TC 614.88 614
STOP STOP
ST
STOP STOP BC 614.38
ST
STOP 613
1.1%
2.8%
CB 33
615
RIM 614.04
No. Description
00
ST
608
13+
609
STOP
613 614 614 613 612 611 610
REVISIONS:
TC 614.86 ST ST 40' WIDE
STOP
ST ST ST
BC 614.36 SPILLWAY 612.36 ST ST ST
ST
EL. 613.50
BERM
ST
ST
STOP
ST
ST
STOP
5
10' WIDE
ST
61
STOP
ST
ST
CB 32
614.50 ST
RIM 615.14
ST
ST
TOP OF ST
ST
BASIN (TYP.)
ST
TC 615.63 ST
1)
616
BC 615.13 TC 615.64
0
ST
1.1%
(C-2
BC 615.14
ST
617
616
STOP
FUTURE RETAIL
INE
ST ST ST ST
FUTURE RETAIL
ST
CB 31
ST ST ST ST
FUTURE RETAIL
ST ST
STOP
ST ST
CHL
12+00
ST
RIM 615.64
FUTURE RETAIL
ST ST ST ST
ST
ST ST
03)
110'x200'
Sealed 07/20/2026
110'x200'
MAT
616.00
110'x200'
(C-2
22,000 SF 110'x200' HIGH POINT:
615.87
ST
22,000 SF 616
INE
22,000 SF 22,000 SF
CHL
TC 615.80
1.0%
BC 615.30
ST
TC 615.74
MAT
BC 615.24
ST
CB 29 FUTURE PROPOSED GRADING LEGEND
ST TC 615.19
BC 614.69
RIM 614.96
RESTAURANT FUTURE RETAIL PROPOSED CONTOUR FUTURE RETA101 IL
TC 615.46
100'x100'
615
ST
ST
ST
CB 30
RIM 614.71
615.17 BC 614.96
100'x100' 100'x100' 100.80
ST
PROPOSED SPOT ELEVATION
616
10,000 SF
615
11+00 10,000 SFTC 100.50
ST
10,000 SF
615
ST
ST
TC 614.76 PROPOSED TOP/BOTTOM OF CURB ELEV. DRAWING NAME:
ST
ST
BC 614.26 BC 100.00
1.0%
TC 615.00
ST
ST
ST ST ST ST ST ST
2.0%
BC 614.50 STOP
STOP PROPOSED CATCH BASIN
Grading Plan
CB
ST ST ST ST
ST
ST ST ST ST ST ST ST ST
ST
ST ST
614.23
CB 27
ST ST
CB 28ST ST ST ST ST ST ST ST ST PAVEMENT/GROUND SLOPE
RIM S614.02 ST
614
RIM 613.79 T
ST ST ST ST ST ST ST ST ST
ST
ST
TC 614.26 YD
TC 614.49 PROPOSED YARD DRAIN
BC 613.76
614.35 BC 613.99
GV Date: 07/20/26
614 PROPOSED MANHOLE MH Drawn By: C. Wood
MATCH OFFSITE Scale: As Noted
SLADE DRIVE IMPROVEMENTS SHOWN MATCH OFFSITE
10+00
IMPROVEMENT PLANS,
DESIGNED BY OTHERS. REFER TO OFFSITE ELEV. = 614.09 IMPROVEMENT PLANS, DRAWING NO.
PLANS BY OTHERS ELEV. = 613.43
GRADING PLAN NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
C-201
SCALE: 1"=40' 40 0 40 80Ft.
40' Project No: 24-4113
Page 1054 of 1174
Page 1055
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
CURRENT
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
SHEET
(DESIGNED
BY OTHERS)
(SHEET C-201)
(SHEET C-203)
Utica
SHEET LOCATION MAP
Buffalo
S T
SCALE: N.T.S.
OP
OP
ST
618
617
West Seneca Exchange
FUT
617
TC 614.9±
BC 614.4± URE
Slade Ave, Ridge Rd & Orchard Park Rd
618
MATCH EX.
1
80,3 -STOR 619
00 S Y RE
P O
ST
.F. TAIL 620
DN
TC 614.7±
BC 614.2±
MATCH EX.
West Seneca New York
TC 614.6±
TC 614.9±
614
BC 614.1±
MATCH EX. BC 614.4±
© CARMINA WOOD DESIGN
MATCH EX.
0
62
TC 615.1±
BC 614.6± TC 615.2±
MATCH EX. BC 614.8±
MATCH EX.
TC 614.9±
BC 614.4± TC 615.9±
MATCH EX. BC 615.4±
TC 615.9± MATCH EX.
TC 615.8±
615
BC 615.4± BC 615.3±
MATCH EX. MATCH EX. TC 615.9± WV
BC 615.4± TC 616.0±
MATCH EX. BC 615.5±
TC 616.2±
BC 615.7± MATCH EX.
CB 42
MATCH EX. RIM 614.52
TC 616.2±
616
Date
BC 615.7±
MATCH EX.
619
TC 616.83 TC 616.4± CB 41
BC 616.33 BC 615.9± RIM 614.26
MATCH EX. MATCH EX.
S)
TC 616.4±
W
HER
88
-B
-BW
BC 615.9±
76
17+
TC 617.01
-BW
Y OT
MATCH EX. TC 616.5±
76
BC 616.51
-BW
76
STOP
No. Description
TC 616.37 616.11 MATCH EX. BC 616.0±
)
76
STOP
NS B
-202
617
BC 615.87 MATCH EX. TC 616.7±
616
CB 39
REVISIONS:
BC 616.2±
RIM 614.35
(PLA
E (C
2.0% MATCH EX.
IN
619
INE
TC 616.49
CHL
616 BC 615.99
CHL
1.1%
MAT
618
618
MAT
618
MATCHLINE (C-202)
00
17+
MATCHLINE (C-201) CB 10
IO
ST
RIM 614.73
PAT
FUT
8
61
615
614.95 URE
ST
130 RETA
615.39 CB 11
615 STOP RIM 614.85
9,10 'x70' IL
STOP
618
617
Sealed 07/20/2026
ST
FU TC 615.25 TC 617.24
RESTTURE D BC 614.75 TC 615.64 0 SF BC 616.74
STOP
0.9%
BC 615.14
AUR RIVE- ST MATCH EX. WV
ANT THR 23+56 CB 12
IO
CB 9 ST
4,96 U
CA
RIM 614.76
PAT
RIM 613.85 26
UT
TC 617.28
3 SF
IO
ST
CB 13
18+
N
2.0%
0
STOP
616 BC 616.78
617
0
614.96
16+
RIM 614.75 MATCH EX.
N
IO
UT
ST
TC 616.86 PROPOSED GRADING LEGEND
CA
STOP
00
614.30
619
STOP 23+ ST BC 616.36
0
18+
0
618
STOP
617
101
615
PROPOSED CONTOUR
614
STOP TC 616.62
ST
TC 616.55
ST
TC 614.33 TC 615.20 BC 616.12 ST BC 616.05 TC 616.83
614 BC 613.83 BC 614.70 1.0% BC 616.33 PROPOSED SPOT ELEVATION 100.80
ST
616.73
ST
ST
CA
615
0.7%
616
617
1.3%
UT
ST
FUT TC 100.50
IO
ST
22+
N
ST
CB 7 0 0 616 PROPOSED TOP/BOTTOM OF CURB ELEV. DRAWING NAME:
616
2,50 URE
616
RIM 612.85
ST
BC 100.00
ST
CB 16
N
ST
IO
Grading Plan
UT
0 G.
ST
ST
CA
LOW POINT: RIM 615.73 TC 616.44
613
ST
STOP
2.0%
FUT
BAN S.F. 613.53 613.30 CB 8 BC 615.94
RES URE D
PROPOSED CATCH BASIN CB
617
00
ST
618
ST HIGH POINT:
K RIM 613.85
ST
15+
613
TC 616.66 616.40 TC 616.19 TAU RIV
6
616 CB 14
3
61
RAN E-TH
61
ST
2.0% BC 616.16 21+ 0.7% RIM 615.20 BC 615.69 ST CB 17 PAVEMENT/GROUND SLOPE
T 2, RU WV
00
0
ST
0 RIM 615.73 380
STOP
613
TC 613.51 ST 616.84
17+
17
STOP
0.7%
TC 616.19 SF
6
BC 613.01 615 YD
2.0%
CB 6
ST
BC 615.69 ST PROPOSED YARD DRAIN
RIM 612.85 TC 615.66
STOP
615.94 ST Date: 07/20/26
613
61 BC 615.16
617
MH
STOP
TC 613.49
ST
6 ST PROPOSED MANHOLE Drawn By: C. Wood
STOP 20+ 615.51 TC 615.20 Scale: As Noted
BC 612.99 ST
TC 615.79 CB 5 STOP CB 15
00
BC 614.70 DRAWING NO.
BC 615.29 RIM 613.91 STOP ST
RIM 615.20 TC 615.66
615.51 615.75
617
ST
2.0%
61
GRADING PLAN
614
ST
ST
BC 615.16
C-202
5 TC 614.00 0
614.62 +0 FU 1.0% CB 18 NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
14614.16
RES TURE D
STOP
BC 613.50 TC 615.51
615
ST
RIM 614.38 CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
ST
615.00 TAU RIV BC 615.01 STOP TC 615.50
ST
614 TC 615.20 615 5
% RAN E-TH 161
9+0 BC 615.00 SCALE: 1"=40' 40 0 40 80Ft.
T, 2 RU 615.24 BC 614.70
2.1%
0.7 TC 614.18 0 TC 615.91
614
12+0 CB 2 CB 38 617
40'
0
,300 615
616
7
0 Project No: 24-4113
0
61
ST
BC 613.68 TC 615.51 BC 615.41
16+
RIM 614.45 RIM 615.03
SF
4.9%
ST
TC 615.50 TC 614.40 BC 615.01 LOW POINT: 6165 TC 615.68
0 15
BC 615.00 BC 613.90 13+0 TC 614.96 615 614.59 BC 615.18 Page 1055 of 1174
BC 614.46 CB 37
ST
Page 1056
617
619
STOP
ST
CA
615.51 620
UT
20+ TC 615.20
IO
00
N
615.51 BC 614.70 MAT 617
615.75
CHL
N
ST
IO
UT
INE
CA
614
MAT
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
(C-2
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
1.0% CB 18
619
CHL 620
619
615
02)
618
(SHEET C-202)
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
RIM 614.38 INE
ST
Greensboro
STOP TC 615.20 615 615 TC 615.50 (C-2
615.24 BC 614.70 19+
(DESIGNED 00 BC 615.00 TC 615.91 01) MAT
CHL 617
00
5
616
BY OTHERS)
7
6 1 TC 615.51 BC 615.41 INE
61
16+
MAT
CA
4.9%
6165 TC 615.68 (BY
UT
BC 615.01 LOW POINT:
CHL
IO
15 620
OTH
N
(SHEET C-201) 615 BC 615.18
614.59 INE ERS
619
CB 37
(C-2
N
1.1% )
IO
UT
1:4.0
RIM 615.03 614 03)
CA
615
1.1%
18+
617
TC 614.95 CURRENT SHEET CB 19 614.80
00
Utica
615 HIGH POINT: TC 615.20
BC 614.45 RIM 614.38 615.80 BC 614.70
613 615
TC 615.05
0
SHEET LOCATION MAP
1:4.
BC 614.55 616 TC 614.69
0
614.25
1:3
62
BC 614.19 CB 20
CA
OFFSITE IMPROVEMENTS SHOWN DESIGNED BY
2.0%
618
.0
UT
612 614
Buffalo
IO
CB 35 6 04 1.0% RIM 614.22 617 620
N
CA
616.19 17+0 OTHERS. REFER TO OFFSITE PLANS BY OTHERS
616
608
UT
605
IO
RIM 614.04 0 616
N
SCALE: N.T.S. 60 615
N
608
IO
7 606 615
UT
CA
TC 616.00
609
611
N
IO
608.00
1.4%
UT
LOW POINT:
CA
TC 615.10 607.80 608.00 BC 615.50 TC 614.70
616
614.55
610
BC 614.60
605
BC 614.20
61
604
TC 615.20
9
1:3.0 2.0 610
606
9
61
BC 614.70
611
%
615
16+
00
607 TC 615.94
0
616
62
608 BC 615.44
612
609
615
615
CA
607.80 CB 21
UT
0
0
62
IO
1:3.
N
608.00
618
1:6. RIM 614.22 616
2.0%
1.0%
620
7 614.88
N
607.80
IO
621
607 608
UT
TC 615.95
CA
622
TC 616.89
617
BC 615.45 15+
61
621 623
PROPOSED STORMWATER 00 BC 616.39 TC 616.79
1:3.
0
9
620
607.80
1:4.
624
608.00 BC 616.29
606
0
625
616
604 616 622
608
MANAGEMENT AREA 601.80
626
HIGH POINT:
1:3. 6
605
1.1% 607 60 616.75 CB 23
605
0 0
6 623
7
RIM 615.50
2.0%
608.00 616.14
1:6.
BOTTOM OF
4
604
605
608
TC 615.99
1:3.0
BASIN (TYP.) CB 22
West Seneca Exchange
617
624
607.80 14+
607
606 603 RIM 615.96 0 BC 615.49
0 625
602 62
618
5
607 1.0% 626
1:6.7
617
606 605 604 603
614
602 614
62
FUT
TC 616.88
7
616
614
Slade Ave, Ridge Rd & Orchard Park Rd
TC 617.24
2
613 ,92
URE
BC 616.38
1:4.0
608.00 LOW POINT: BC 616.74
5 G.
62
616 13+ 615.55
6
00
RET S.F. STOP 615
62 624 625
617 62 3
2 626
2.8%
AIL 1.3%
62
616
614 ST
1
TC 617.85
616
616
625
62
608 ST
614 613 612 611 610 609
0
613 614 STCB 24 613 TC 616.09 BC 617.35
61
40' WIDE ST BC 615.59
9
ST RIM 615.51
1:4.
ST
SPILLWAY 612.36 ST ST ST
ST 615
61
EL. 613.50 12+
ERM
0
8
ST
TC 618.39
ST
ST ST 0 0 618
1.5%
B
ST
616 BC 617.89
West Seneca New York
10' WIDE
ST
ST
617
STOP
STOP
ST ST
ST
ST ST
616 617
614.50 ST
CB 25
TOP OF
ST ST 617
ST
© CARMINA WOOD DESIGN
ST
RIM 616.12 615 618
STOP
ST
BASIN (TYP.) ST
ST ST
614 11+ 1.8%
ST
ST
FU 00 MATCH OFFSITE
618
RES TURE D 613 ST
IMPROVEMENT PLANS,
TAU RIV ELEV. = 618.86
STOP
ST ST ST RAN E-TH 618 MAT
618
ST ST
T 2, RU
66118
CHL
ST ST ST
STOP
ST ST ST ST
380 MAT
ST
8
INE
ST ST ST ST ST TC 617.91
ST
SF BC 617.41 CHL (BY
INE OTH
10 (C-2 ERS
0 )
ST
STOP ST CB 26
+0
0 3)
ST RIM 617.82 MATCH OFFSITE
IMPROVEMENT PLANS,
ST
ST
ELEV. = 617.93
ST
)
-201
FUTURE RETAIL
Date
RESTAURANT FUTURE RETAIL
E (C
100'x100' 100'x100'
HLIN
EX. OFFICE
ST
10,000 SF
C
10,000 SF
ST
MAT
03)
7,980 SF
(C-2
ST
ST
STOP
INE
STOP
ST
No. Description
CHL
ST
MAT
ST
REVISIONS:
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
STOP
SLADE DRIVE IMPROVEMENTS SHOWN
DESIGNED BY OTHERS. REFER TO OFFSITE
PLANS BY OTHERS
Sealed 07/20/2026
PROPOSED GRADING LEGEND
PROPOSED CONTOUR 101
PROPOSED SPOT ELEVATION 100.80
PROPOSED TOP/BOTTOM OF CURB ELEV.
TC 100.50 DRAWING NAME:
BC 100.00
PROPOSED CATCH BASIN
Grading Plan
CB
PAVEMENT/GROUND SLOPE
PROPOSED YARD DRAIN YD
Date: 07/20/26
PROPOSED MANHOLE MH Drawn By: C. Wood
Scale: As Noted
DRAWING NO.
GRADING PLAN NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
C-203
SCALE: 1"=40' 40 0 40 80Ft.
40' Project No: 24-4113
Page 1056 of 1174
Page 1057
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
(SHEET C-302)
Greensboro
(DESIGNED
BY OTHERS)
) S
HER
(SHEET C-301)
Y OT
(PLA )
NS B
02
(C-3
(SHEET C-303)
Utica
LINE
LINE
SHEET LOCATION MAP
CH
CH
MAT
Buffalo
MAT
SCALE: N.T.S.
ST
OP
O P
ST
FUT
URE
1
80,3 -STOR
P
ST
O 00 S Y RE
.F. TAIL
WV
DN
NOTE:
FUTURE DEVELOPMENT AREAS SHOWN DN
ON THIS PLAN SET ARE CONSIDERED
West Seneca Exchange
TO BE CONCEPTUAL ONLY.
WV
Slade Ave, Ridge Rd & Orchard Park Rd
ST
ST WHO PROPO
LE SED
158 SALE R
-BW
-BW
76
,000 ETA
-BW
76
ST
-BW
76
SF IL
76
ST
ST
MATCH LINE (C-302)
ST
ST NOTE:
IO
MATCH LINE (C-301) OFFSITE IMPROVEMENTS SHOWN DESIGNED BY
PAT
West Seneca New York
FUT
UR OTHERS. REFER TO OFFSITE PLANS BY OTHERS
130 E RETA
ST
ST
ST
FU 9,10 'x70' IL
RES TURE D 0 SF
STOP
TAU RIVE
© CARMINA WOOD DESIGN
N
RAN -TH ST ST WV
IO
UT
CA
IO
T 4, RU
ST
CA
PAT
963
UT
IO
SF
N
N
IO
UT
CA
CA
UT
IO
N
ST
ST
ST
ST
ST
CA
ST
UT
GV
FU ST ST
IO
N
2,50 TURE
ST
N
IO
UT
0
CA
ST
BAN G.S.F. FU
ST
ST WV
ST
K RES TURE D N
UT
IO
TAU RIV
CA
ST
ST RAN E-TH
ST T 2, RU WV
380
STOP
WV
SF
ST ST CA
UT
IO
N
STOP
ST
ST
CA
UT
STOP
IO
ST
N
N
IO
UT
ST
CA
FU
REST TURE D
STOP
ST
ST
ST
AUR RIVE
ST ANT -THR
, 2,3 U
00 S
CA
F
UT
IO
N
ST
ST
N
ST
IO
UT
ST
CA
ST
GV
STOP
STOP STOP ST
STOP
ST
Date
621
ST
ST
CA
ST
UT
IO
N
CA
UT
IO
N
ST
N
IO
UT
CA
N
STOP
IO
UT
CA
ST
STOP
STOP STOP
ST
ST
ST
ST
ST
CA
UT
IO
N
STOP
STOP
ST
ST
N
IO
ST
UT
CA
ST PROPOSED STORMWATER
ST
ST
ST
MANAGEMENT AREA
GV
ST
ST
ST
ST ST
ST
ONLY ST FU
ST
No. Description
ONLY
STOP STOP STOP STOP 2,92 TURE
STOP 5
RET G.S.F.
STOP STOP STOP STOP
ST
STOP
AIL
REVISIONS:
ST
STOP
ST
ST
ST ST ST
STOP
ST
STOP ST ST
STOP
STOP
STOP
ST
ST ST
STOP
ST
ST
ST
ST
FU ST
RES TURE D
ST TAU RIV
STOP
ST
FUTURE RETAIL FUTURE RETAIL FUTURE RETAIL
ST ST ST ST RAN E-TH
T 2, RU
MAT
STOP
ST ST
110'x200' FUTURE RETAIL 380
SF
CH
110'x200' 110'x200' 110'x200' LINE
ST
22,000 SF MAT
ST
22,000 SF 22,000 SF NOTE: STOP
(PLA
22,000 SF ST CH
ST
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN LINE NS B
NOTE: FUTURE SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. (C-3 YO
RESTAURANT FUTURE RETAIL FUTURE RETAIL 03) THE
ST FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN
100'x100' 100'x100' 100'x100'
RS)
ST
SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. 10,000 SF EX. OFFICE
ST 10,000 SF 10,000 SF 7,980 SF
ST
ST
ST
ST ST ST ST STOP
ST ST ST ST STOP
Sealed 07/20/2026
ST ST ST ST ST ST ST
ST
STOP
GV
GV
(C-3 )
01
03)
(C-3
LINE
LINE
CH
CH
MAT
MAT
DRAWING NAME:
STORM DRAINAGE PLAN Storm Drainage
Plan - Overall
SCALE: 1"=100'
Date: 07/20/26
Drawn By: C. Wood
Scale: As Noted
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,C-300
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
100 0 100 200Ft. Project No: 24-4113
100'
Page 1057 of 1174
Page 1058
ST
ST
MATCHLINE (C-302)
00
ST
17+
33 LF 12"
ST
MATCHLINE (C-301)
IO
ST CB 10 HDPE @
ST
PAT
RIM 614.73 1.00% CB 11
FUT
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
RIM 614.85
ST
183 LF 48" SW INV 612.73
URE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
(SHEET C-302) ST
NE INV 612.40
Greensboro
HDPE @
ST
130 RETA
0.50% SW INV 612.40 322 LF 24"
(DESIGNED ST
HDPE @
ST
ST
BY OTHERS) PROPOSED PIPE CROSSING: 49 LF 12" ST MH #2 9,10 'x70' IL 0.39%
ST
CURRENT FUT 10" SAN. INV=603.00 ST HDPE @ RIM 613.77
0 SF
RES URE D
ST
ST
1.00% W INV 605.48
STOP
SHEET 48" STORM INV=605.05 PROPOSED STORM DRAINAGE STRUCTURES
TAU RIVE 45 LF 18" NE INV 605.48
ST
AND ASSOCIATED PIPING ARE SHOWN FOR
RAN -TH ST
23+56
IO
T 4, RU HDPE @ INFORMATIONAL PURPOSES ONLY AND WILL
ST
ST
28 LF 24" CB 12
ST
PAT
963
26
1.00% HDPE @ ST RIM 614.76 BE DESIGNED AS PART OF FUTURE
(SHEET C-303) SF
ST
18+
Utica
00
CB 9 1.02% 21 LF 12" NE INV 611.91 DEVELOPMENT PHASES
16+
RIM 613.85
ST
HDPE @ NW INV 611.91 ST
SW INV 611.35
SHEET LOCATION MAP 1.00%
+00
23+ ST
00
ST
ST18
ST
PROPOSED PIPE CROSSING: ST CB 13
Buffalo
ST
ST
8" SAN. INV=603.13 RIM 614.75 MAT
ST
24" STORM INV=608.20 CB 8 ST CHL
SCALE: N.T.S. RIM 613.85
SE INV 611.70 ST
INE
SW INV 611.70
ST
ST
NW INV 608.37 ST
ST
ST
ST
ST
CB 7 NE INV 610.90 ST ST
FU
ST
RIM 612.85 SE INV 608.37 22+ ST
ST
00
2,50 TURE
PROPOSED PIPE CROSSING: ST
ST
SW INV 610.85 80 LF 18" 8" SAN. INV=603.15
ST
ST
ST
ST
ST CB 14
0 G.
ST
HDPE @ ST 48" STORM INV=605.56 RIM 615.20
ST
40 LF 24" FU
ST
BAN S.F.
ST
1.00%
RES TURE D
S INV 609.50 HDPE @
0
ST
CB 16
ST
ST
K
ST
ST
0
ST
ST
NW INV 609.50
15+
CB 6 290 LF 12" 0.58% RIM 615.73 TAU RIV
NT 2 E-TSTORM
RAPROPOSED
ST
00 ST
45 LF 12" ST ST
ST
HDPE @
RIM 612.85 HDPE @ 21+
00
SE INV 609.73 HRU DRAINAGE STRUCTURES
ST
ST SHOWN,3W/ASSOCIATED PIPING TO BE
STOP
NW INV 609.17 ST 0.80% SW INV 610.00 80DURING
ST
17 +
1.53% N INV 609.73 INSTALLED SF FUTURE PHASE OF WORK
10+ NE INV 610.16 ST ST
ST
ST
00 SE INV 609.17
ST
187 LF 48" CB 15
ST
21 LF 24"
STOP
ST
ST
HDPE @ RIM 615.20 ST HDPE @
ST
0.51% ST
NE INV 609.38 21 LF 18" CB 17 ST
CB 1 0.57%
CB 5 STOP ST
SE INV 609.38 20+ HDPE @ RIM 615.73
RIM 615.34 00 40 LF 24"
ST
PROPOSED STORM DRAINAGE STRUCTURES
ST
RIM 613.91 W INV 609.38 3.00% NE INV 610.63
11+0 S INV 612.84 AND ASSOCIATED PIPING ARE SHOWN FOR
ST
HDPE @
West Seneca Exchange
39 LF 12"
ST
0 SW INV 611.91
ST
INFORMATIONAL PURPOSES ONLY AND WILL ST 0.63% CB 38
ST
HDPE @00
ST
+ BE DESIGNED AS PART OFFFUTURE
UTU
ST
14
1.00% RIM 615.03
STOP
ST
ST 137 LF 18" DEVELOPMENT PHASESR RE E INV 609.13 21 LF 18"
ESTA CB 18
ST
HDPE @
URA DRIVE-T
ST
CB 2 HDPE @
ST
SW INV 611.81
ST
PROPOSED PIPE CROSSING: RIM 614.38
Slade Ave, Ridge Rd & Orchard Park Rd
ST
RIM 614.45 1.00% NT, H 1 9
NW INV 609.13+00 0.52%
2,30 RU NW INV 608.34
ST
8" SAN. INV= 604.55
ST
12+0
00
16+ST
PROPOSED PIPE CROSSING: 0 ST N INV 611.64
ST
ST
0 SF 24" STORM INV=609.25 95 LF 24"
ST
120 LF 18" CB 4
ST
10" SAN. INV=601.18 35 LF 18" W INV 611.64 305 LF 48" HDPE @ CB 19
HDPE @ RIM 613.70 ST CB 37
18" STORM INV=611.95 HDPE @ 13+00 ST MH #1 HDPE @ 0.73% RIM 615.03 RIM 614.38 PROPOSED PIPE CROSSING:
N INV 610.54
ST
1.00%
NE INV 612.02 SE INV 608.23
ST
1.00% ST 0.50%
ST
ST
NE INV 611.52 RIM 612.93 CB 36 8" SAN. INV= 605.10
ST
ST SW INV 606.43 ST 21 LF 12" NW INV 608.23 18" STORM INV=608.15
ORCHARD PARK ROAD IMPROVEMENTS SHOWN SE INV 610.54 RIM 614.04
ST
CB 3 ST E INV 606.43 HDPE @ 18+
ST
DESIGNED BY OTHERS. REFER TO OFFSITE ST SE INV 608.44 00
STOP
ST
1.00% 48 LF 18"
ST
PLANS BY OTHERS RIM 614.25 STOP SW INV 608.44
STOP
ST
ST
HDPE @
STOP
E INV 611.29 ST 75 LF 18"
ST
ST
0.48%
ST
ST
S INV 611.29 HDPE @ ST 48 LF 30"
ST
1.01% ST ST HDPE @
West Seneca New York
ST
ST 0.64%
ST
ST
ST END SECTION 17+0 33 LF 12"
W/ RIPRAP PROPOSED PIPE CROSSING: 0
ST ST HDPE @
© CARMINA WOOD DESIGN
END SECTION 3.70%
STOP FOR
00
PROPOSED STORM DRAINAGE STRUCTURES 8" SAN. INV= 605.67
ST
ST
W/ RIPRAP
15+
ST
AND ASSOCIATED PIPING ARE SHOWN 36" STORM INV=608.20 PROPOSED PIPE CROSSING:
ST
21 LF 30"
ST
ST
INFORMATIONAL PURPOSES ONLY AND WILL
ST
8" SAN. INV= 606.18
ST
BE DESIGNED AS PART OF FUTURE HDPE @
STOP
ST 18" STORM INV=608.30
STOP ST DEVELOPMENT PHASES
STOP 0.62% 47 LF 18"
ST
ST
ST
ST
CB 35
ST
ST HDPE @
RIM 614.04
ST
ST 0.99%
NE INV 608.31
ST
ST
ST
ST
ST SW INV 608.31
STOP
STOP END SECTION END SECTION
ST
ST
W/ RIPRAP W/ RIPRAP
ST
ST
INV 607.95
ST
ST
ST
ST PROPOSED STORMWATER
ST
ST
MANAGEMENT AREA
ST
ST
ST
00
14+
ST ST
ST
ST 21 LF 30" END SECTION
ST
Date
ST
ST
ST HDPE @ W/ RIPRAP
PROPOSED STORM DRAINAGE STRUCTURES ST
0.67% ST
ST
AND ASSOCIATED PIPING ARE SHOWN FOR
ST
ST
INFORMATIONAL PURPOSES ONLY AND WILL ST ST
BE DESIGNED AS PART OF FUTURE ST
ST
DEVELOPMENT PHASES
STOP STOP ST
STOP STOP CB 34
STOP STOP RIM 614.04 90 LF 30"
ST
STOP STOP CB 33 HDPE @
ST
ST
W INV 608.87 STOP RIM 614.04
SW INV 608.87 0.81%
NE INV 608.73
No. Description
T00
SE INV 608.73
ST
13S+
STOP
REVISIONS:
ST ST
STOP
ST ST ST ST ST ST
ST
ST
101 LF 24" ST
ST
CBSTOP HDPE @
ST
32 ST
RIM 615.14 STOP 0.65% PROPOSED STORMSTOP
DRAINAGE STRUCTURES
ST
ST
ST
ST
W INV 609.52 AND ASSOCIATED PIPING ARE SHOWN FOR ST
E INV 609.52 45 LF 24"
ST
ST
INFORMATIONAL PURPOSES ONLY AND WILL ST
HDPE @ BE DESIGNED AS PART OF FUTURE ST
ST
ST
0.57% DEVELOPMENT PHASES
)
ST
CB 31
-301
ST
RIM 615.64
ST
E (C
W INV 609.78
STOP
FUTURE RETAIL
ST ST ST ST
12+00 ST
FUTURE RETAIL
ST
E INV 609.78 ST ST ST ST
FUTURE RETAIL
ST
IN
ST
STOP
ST ST ST
FUTURE RETAIL
ST ST ST ST
ST
ST
CHL
ST
110'x200'
Sealed 07/20/2026
)
110'x200'
-303
110'x200'
MAT
22,000 SF 110'x200'
ST
74 LF 24"
ST
E (C
22,000 SF 22,000 SF 22,000 SF
HDPE @
0.58%
IN
ST
CHL
ST
CB 29
MAT
RIM 614.96
CB 30
N INV 609.54 FUTURE
ST
RIM 614.71
ST
ST
PROPOSED STORM DRAINAGE STRUCTURES SHOWN
W INV 610.21
S INV 608.53 ST
RESTAURANT FUTURE RETAIL FUTURE RETAIL
PROPOSED STORM DRAINAGE LEGEND
W/PROPOSED STORM DRAINAGE STRUCTURES AND
100'x100'
ST E INV 610.21
ST
ST
ASSOCIATED PIPING ARE SHOWN FOR INFORMATIONAL
PURPOSES ONLY AND WILL BE DESIGNED AS PART OF ST 100'x100' PROPOSED STORM PIPE
100'x100' ST
ST
FUTURE DEVELOPMENT PHASES
11+00 10,000 SF PROPOSED PERFORATED 10,0
ST
10,000 SF 00 SF
ST
ST PIPING TO BE INSTALLED DURING FUTURE PHASE OF WORK 33 LF 18"
92 LF 24" PROPOSED STORM DRAINAGE STRUCTURES AND STORM PIPE
ST
HDPE @ DRAWING NAME:
ST
ST HDPE @ ASSOCIATED PIPING ARE SHOWN FOR
3.06%
ST
INFORMATIONAL PURPOSES ONLY AND WILL BE PROPOSED CATCH BASIN
ST
0.63%
ST ST ST ST ST ST ST CB 27
STOP
DESIGNED AS PART OF FUTURE DEVELOPMENT STOP Storm Drainage
ST
ST ST ST RIM 614.02 PHASES
ST
ST ST ST ST
Plan
ST ST ST ST
N INV 611.11 PROPOSED MANHOLE
ST
ST ST
ST ST ST
ST ST ST ST ST ST ST
ST
ST ST
ST
ST ST ST ST ST ST ST ST ST
ST PROPOSED CLEANOUT
ST ST
CB: CATCH BASIN
CB 28 MH: MANHOLE Date: 07/20/26
WQu: WATER QUALITY TREATMENT UNIT
RIM 613.79 Drawn By: C. Wood
SLADE DRIVE IMPROVEMENTS SHOWN S INV 610.79 33 LF 18" Scale: As Noted
10+00
DESIGNED BY OTHERS. REFER TO OFFSITE E INV 610.79 HDPE @
0.97% DRAWING NO.
PLANS BY OTHERS
STORM DRAINAGE PLAN NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
C-301
SCALE: 1"=40' 40 0 40 80Ft.
40' Project No: 24-4113
Page 1058 of 1174
Page 1059
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
CURRENT
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
SHEET
(DESIGNED
BY OTHERS)
(SHEET C-301)
(SHEET C-303)
Utica
SHEET LOCATION MAP
Buffalo
S T
SCALE: N.T.S.
OP
OP
ST
West Seneca Exchange
FUT
URE
Slade Ave, Ridge Rd & Orchard Park Rd
1
80,3 -STOR
00 S Y RE
P O
ST
.F. TAIL DN
NOTE:
FUTURE DEVELOPMENT AREAS SHOWN
West Seneca New York
PROPOSED PIPE CROSSING:
10" SAN. INV=604.50
42" STORM INV=606.58 ON THIS PLAN SET ARE CONSIDERED
© CARMINA WOOD DESIGN
TO BE CONCEPTUAL ONLY.
WV
CB 42
RIM 614.52
SW INV 611.34
Date
ST
ST
ST CB 41
ST RIM 614.26
122 LF 18" NE INV 610.97
HDPE @ ST
S)
SW INV 610.97
W
0.30%
HER
NW INV 610.97
88
-B
-BW
76
17+
-BW
Y OT
76
ST
CONNECT TO EXISTING 127 LF 18"
ST
-BW
76
HDPE @
No. Description
MANHOLE WITH TIDEFLEX ST
CB 39
)
76
NS B
-302
CHECK VALVE. CONNECT AT ST 0.30% RIM 614.35
EXISTING INVERT ELEVATION
REVISIONS:
NE INV 611.35
ST
(PLA
E (C
ST
604.56±.
ST
IN
PLUG EX. SW INV
INE
ST
CHL
CHL
MAT
ST
ST
MAT
MATCHLINE (C-302)
00
ST
17+
33 LF 12"
ST
MATCHLINE (C-301)
IO
ST CB 10 HDPE @
ST
PAT
1.00% CB 11
RIM 614.73
RIM 614.85 FUT
ST
183 LF 48" SW INV 612.73
HDPE @
ST
NE INV 612.40 URE
ST
130 RETA
0.50% ST SW INV 612.40 322 LF 24"
HDPE @
ST
ST
9,10 'x70' IL
Sealed 07/20/2026
PROPOSED PIPE CROSSING: 49 LF 12" ST MH #2 0.39%
ST
FUT 10" SAN. INV=603.00 ST HDPE @ RIM 613.77
0 SF
REST URE D
ST
ST
1.00% W INV 605.48
STOP
48" STORM INV=605.05 PROPOSED STORM DRAINAGE STRUCTURES
AUR RIVE- 45 LF 18" ST NE INV 605.48
ST
AND ASSOCIATED PIPING ARE SHOWN FOR WV
ANT THR 23+56
IO
HDPE @ INFORMATIONAL PURPOSES ONLY AND WILL
ST
ST
4,96 U 28 LF 24" CB 12
ST
CA
PAT
1.00% 26
UT
BE DESIGNED AS PART OF FUTURE
3 SF
IO
HDPE @ ST RIM 614.76 ST
18+
N
0
CB 9 DEVELOPMENT PHASES
0
1.02% 21 LF 12" NE INV 611.91
16+
N
RIM 613.85
IO
ST
HDPE @ NW INV 611.91
UT
ST
CA
SW INV 611.35 1.00%
+00
23+ ST
0 0
ST
ST18
ST
PROPOSED PIPE CROSSING: ST CB 13 ST PROPOSED STORM DRAINAGE LEGEND
ST
8" SAN. INV=603.13 RIM 614.75
ST
24" STORM INV=608.20 CB 8 ST
SE INV 611.70 ST PROPOSED STORM PIPE ST
RIM 613.85 SW INV 611.70
ST
ST
NW INV 608.37 ST
ST
ST
ST
ST
NE INV 610.90
CA
CB 7 ST PROPOSED PERFORATED
UT
ST
FUT
IO
ST
SE INV 608.37 22+ STORM PIPE
N
RIM 612.85 ST
ST
PROPOSED PIPE CROSSING: ST 0 0 DRAWING NAME:
2,50 URE
ST
SW INV 610.85 80 LF 18" 8" SAN. INV=603.15
ST
ST
N
ST
ST
CB 14
IO
ST
PROPOSED CATCH BASIN
UT
0 G. Storm Drainage
ST
HDPE @ 48" STORM INV=605.56 ST
CA
ST RIM 615.20 40 LF 24" FUT
ST
BAN S.F.
ST
1.00% S INV 609.50 HDPE @ RES URE D
00
ST
CB 16 Plan
ST
ST
K
ST
ST
ST
ST
NW INV 609.50 PROPOSED MANHOLE
15+
CB 6 290 LF 12" 0.58% RIM 615.73 TAU RIV
NT 2 E-TSTORM
RAPROPOSED
ST
00 T
ST ST
45 LF 12"
17+ S
ST
HDPE @
RIM 612.85 HDPE @ 21+
0
SE INV 609.73 HRU DRAINAGE STRUCTURES WV
ST
ST 0 SHOWN,3W/ASSOCIATED PIPING TO BE
STOP
NW INV 609.17 ST 0.80% SW INV 610.00 80DURING
ST
1.53% PROPOSED CLEANOUT
NE INV 610.16 ST ST
ST
N INV 609.73 INSTALLED SF FUTURE PHASE OF WORK
ST
ST
SE INV 609.17 187 LF 48" ST CB: CATCH BASIN
CB 15 21 LF 24" MH: MANHOLE
STOP
Date: 07/20/26
ST
ST
HDPE @ RIM 615.20 ST HDPE @ WQu: WATER QUALITY TREATMENT UNIT
ST
0.51% ST
21 LF 18" ST Drawn By: C. Wood
NE INV 609.38 0.57% CB 17
STOP ST 20+ HDPE @ RIM 615.73 Scale: As Noted
CB 5 SE INV 609.38 00 40 LF 24"
ST
PROPOSED STORM DRAINAGE STRUCTURES 3.00%
ST
RIM 613.91 ST W INV 609.38 NE INV 610.63 DRAWING NO.
39 LF 12" AND ASSOCIATED PIPING ARE SHOWN FOR HDPE @
ST
SW INV 611.91
ST
INFORMATIONAL PURPOSES ONLY AND WILL 0.63% CB 38
STORM DRAINAGE PLAN
ST
ST
HDPE @00
C-302
ST
+ BE DESIGNED AS PART OFFFUTURE
UTU NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
ST
14
1.00% RIM 615.03
STOP
ST
ST 137 LF 18" DEVELOPMENT PHASESR RE E INV 609.13 21 LF 18" CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
ESTA CB 18
ST
HDPE @
URA DRIVE-T
ST
CB 2 HDPE @
ST
SW INV 611.81
ST
ST
1.00% PROPOSED PIPE CROSSING: 19+ RIM 614.38 40 0 40 80Ft.
RIM 614.45 NT, H NW INV 609.13 0.52% SCALE: 1"=40'
2,30 RU
ST
8" SAN. INV= 604.55 00 NW INV 608.34
ST
12+0 40'
00
16+ST
0 ST N INV 611.64 Project No: 24-4113
ST
ST
0 SF 24" STORM INV=609.25 95 LF 24"
ST
120 LF 18" CB 4
ST
35 LF 18" W INV 611.64 305 LF 48" HDPE @ CB 19
HDPE @ RIM 613.70 ST CB 37
HDPE @ 13+00 ST MH #1 HDPE @ 0.73% RIM 615.03 RIM 614.38
N INV 610.54 PROPOSED PIPE CROSSING: Page 1059 of 1174
ST
1.00% 1.00% ST
ST SE INV 608.23
ST
Page 1060
0.57% 21 LF 18" CB 17 ST
CA
UT
20+ HDPE @ RIM 615.73
IO
00
N
40 LF 24" 3.00%
HDPE @
NE INV 610.63 MAT
CHL
N
ST
IO
ST
UT
0.63% CB 38 INE
CA
MAT
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
(C-3
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
RIM 615.03
(SHEET C-302) CHL 02)
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
E INV 609.13 21 LF 18" CB 18 INE
ST
Greensboro
SW INV 611.81 HDPE @ RIM 614.38 (C-3
NW INV 19+
(DESIGNED
609.13 00 0.52% NW INV 608.34 01) MAT
CHL
00
16+ST
BY OTHERS) INE
MAT
CA
CB 19 (BY
UT
CB 37 CHL
IO
OTH
N
(SHEET C-301) RIM 614.38
RIM 615.03 PROPOSED PIPE CROSSING: INE ERS
ST
NE INV 612.02 SE INV 608.23 (C-3
N
8" SAN. INV= 605.10 )
IO
UT
ST
NW INV 608.23 03)
CA
21 LF 12" 18" STORM INV=608.15
HDPE @ CURRENT SHEET 18+
00
Utica
1.00% 48 LF 18"
ST
HDPE @
0.48%
SHEET LOCATION MAP
48 LF 30"
HDPE @ CB 20
CA
OFFSITE IMPROVEMENTS SHOWN DESIGNED BY
UT
RIM 614.22
Buffalo
IO
0.64% OTHERS. REFER TO OFFSITE PLANS BY OTHERS
N
CA
END SECTION 17+0
UT
33 LF 12" NW INV 612.22
IO
0
N
SCALE: N.T.S. W/ RIPRAP PROPOSED PIPE CROSSING:
N
HDPE @
IO
UT
ST
END SECTION
CA
3.70%
N
IO
8" SAN. INV= 605.67
UT
ST W/ RIPRAP
CA
36" STORM INV=608.20 PROPOSED PIPE CROSSING:
ST
8" SAN. INV= 606.18
18" STORM INV=608.30
ST 47 LF 18" 16+ 171 LF 18"
ST 00 HDPE @
HDPE @
0.84%
ST
0.99% ST
CA
UT
IO
N
ST
END SECTION END SECTION
ST
N
IO
ST
W/ RIPRAP
UT
W/ RIPRAP
CA
INV 607.95 ST PROPOSED PIPE CROSSING:
15+ 18" STORM INV= 612.60
PROPOSED STORMWATER CB 21
RIM 614.22
ST
00
42" STORM INV=608.60
SW INV 611.00 ST
MANAGEMENT AREA SE INV 611.00
NW INV 608.47 CB 22
ST
CB 23
RIM 615.96 RIM 615.50
ST
SW INV 612.43
West Seneca Exchange
14+ NW INV 613.50
NE INV 612.43 ST 00
ST 165 LF 18"
ST HDPE @ 45 LF 12"
FUT 0.35%
Slade Ave, Ridge Rd & Orchard Park Rd
ST
HDPE @
2 , 9
PROPOSED PIPE CROSSING: URE ST
1.09%
8" SAN. INV= 607.02 25
ST CB 24
13+
RET G.S.F. STOP 00 RIM 615.51
ST
42" STORM INV=608.44 ST
SW INV 613.01
AIL ST
SE INV 613.01
ST
ST NE INV 613.01
ST
ST ST ST ST ST ST
ST
ST
ST ST 12+
ST
ST
ST ST 71 LF 18" 0 0
HDPE @
West Seneca New York
ST
PROPOSED STORMSTOP
DRAINAGE STRUCTURES ST
STOP
ST ST
0.78% ST
ST
ST ST
AND ASSOCIATED PIPING ARE SHOWN FOR ST CB 25
INFORMATIONAL PURPOSES ONLY AND WILL
ST RIM 616.12 ST ST
ST
© CARMINA WOOD DESIGN
ST
STOP
BE DESIGNED AS PART OF FUTURE ST
ST SW INV 613.56 ST
DEVELOPMENT PHASES ST NE INV 613.56 ST
11+
ST
ST ST
FU 00
01)
RES TURE D
ST ST
147 LF 18"
(C-3
TAU RIV
STOP
RAN E-TH HDPE @ ST
ST ST ST ST ST
1.20% MAT
T 2, RU CHL
ST ST ST
STOP
ST
INE
ST ST ST
380 MAT
ST
INE
ST ST ST ST
PROPOSED STORM DRAINAGE STRUCTURES AND ASSOCIATED
ST
ST
SF CB 26 CHL (BY
CHL
PIPING ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY AND
WILL BE DESIGNED AS PART OF FUTURE DEVELOPMENT PHASES
RIM 617.82 INE OTH
(C-3 ERS
MAT
NE INV 615.33
)
10
0 )
-303
ST
STOP ST +0
0 3)
E (C
ST
ST
ST
HLIN
ST
C
FUTURE RETAIL
MAT
Date
RESTAURANT FUTURE RETAIL
100'x100' 100'x100' EX. OFFICE
ST
10,000 SF 10,000 SF
ST
PROPOSED STORM DRAINAGE STRUCTURES AND 7,980 SF
ST
ASSOCIATED PIPING ARE SHOWN FOR
ST
STOP INFORMATIONAL PURPOSES ONLY AND WILL BE
DESIGNED AS PART OF FUTURE DEVELOPMENT STOP
PHASES
ST
No. Description
ST
ST
REVISIONS:
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
STOP
SLADE DRIVE IMPROVEMENTS SHOWN
DESIGNED BY OTHERS. REFER TO OFFSITE
PLANS BY OTHERS
Sealed 07/20/2026
PROPOSED STORM DRAINAGE LEGEND
PROPOSED STORM PIPE ST
PROPOSED PERFORATED
STORM PIPE DRAWING NAME:
PROPOSED CATCH BASIN
Storm Drainage
PROPOSED MANHOLE Plan
PROPOSED CLEANOUT
CB: CATCH BASIN
MH: MANHOLE Date: 07/20/26
WQu: WATER QUALITY TREATMENT UNIT Drawn By: C. Wood
Scale: As Noted
DRAWING NO.
STORM DRAINAGE PLAN NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
C-303
SCALE: 1"=40' 40 0 40 80Ft.
40' Project No: 24-4113
Page 1060 of 1174
Page 1061
NW INV 610.97
88
17+
ST
CONNECT TO EXISTING 127 LF 18"
ST
MANHOLE WITH TIDEFLEX ST HDPE @ CB 39
CHECK VALVE. CONNECT AT ST 0.30% RIM 614.35
EXISTING INVERT ELEVATION NE INV 611.35
ST
ST
604.56±.
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
ST
PLUG EX. SW INV
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
ST
Greensboro
ST
ST
00
ST
17+
33 LF 12"
ST
IO
ST CB 10 HDPE @
ST
PAT
1.00% CB 11
RIM 614.73
RIM 614.85 FUT
ST
183 LF 48" SW INV 612.73
URE
Utica
ST NE INV 612.40
HDPE @
ST
130 RETA
0.50% ST SW INV 612.40 322 LF 24"
HDPE @
ST
ST
PROPOSED PIPE CROSSING: 49 LF 12" ST MH #2 9,10 'x70' IL 0.39%
ST
FUT 10" SAN. INV=603.00 ST HDPE @ RIM 613.77
0 SF
Buffalo
RES URE D
ST
ST
1.00% W INV 605.48
STOP
48" STORM INV=605.05 PROPOSED STORM DRAINAGE STRUCTURES
TAU RIVE 45 LF 18" NE INV 605.48
ST
AND ASSOCIATED PIPING ARE SHOWN FOR
RAN -TH ST
23+56
IO
T 4, RU HDPE @ INFORMATIONAL PURPOSES ONLY AND WILL
ST
ST
28 LF 24" CB 12
T
CA
PAT
96 3
26
S
1.00%
UT
BE DESIGNED AS PART OF FUTURE
IO
HDPE @ ST RIM 614.76 ST
SF
18+
N
00
CB 9 1.02% 21 LF 12" NE INV 611.91 DEVELOPMENT PHASES
16+
N
RIM 613.85
IO
ST
HDPE @ NW INV 611.91
UT
ST
CA
SW INV 611.35 1.00%
+00
23+ ST
00
ST
ST18
ST
PROPOSED PIPE CROSSING: ST CB 13 ST
ST
8" SAN. INV=603.13 RIM 614.75
ST
24" STORM INV=608.20 CB 8 ST
SE INV 611.70 ST
RIM 613.85
SW INV 611.70
ST
ST
NW INV 608.37 ST
ST
ST
ST
ST
CB 7 NE INV 610.90 ST
ST
ST
RIM 612.85 SE INV 608.37 22+ ST
ST
PROPOSED PIPE CROSSING: ST 00 ST
SW INV 610.85 80 LF 18" 8" SAN. INV=603.15
ST
ST
ST
ST
ST CB 14
ST
HDPE @ ST 48" STORM INV=605.56 RIM 615.20
ST
FU
ST
1.00% ST 40 LF 24"
RES TURE D
S INV 609.50 HDPE @
00
ST
CB 16
ST
ST ST
ST
ST
ST
NW INV 609.50
15+
CB 6 290 LF 12" 0.58% RIM 615.73 TAU RIV
NT 2 E-TSTORM
RAPROPOSED
ST
West Seneca Exchange
00 T
ST ST
45 LF 12"
17+ S
ST
HDPE @
RIM 612.85 HDPE @ 21+
00
SE INV 609.73 HRU DRAINAGE STRUCTURES
ST
ST SHOWN,3W/ASSOCIATED PIPING TO BE
STOP
NW INV 609.17 ST 0.80% SW INV 610.00 80DURING
ST
1.53% N INV 609.73 INSTALLED SF FUTURE PHASE OF WORK
NE INV 610.16 ST ST
ST
ST
ST
SE INV 609.17 187 LF 48" ST
Slade Ave, Ridge Rd & Orchard Park Rd
CB 15 21 LF 24"
STOP
ST
ST
HDPE @ RIM 615.20 ST
HDPE @
ST
0.51% ST
NE INV 609.38 21 LF 18" CB 17 ST
0.57%
CB 5 STOP ST
SE INV 609.38 20+ HDPE @ RIM 615.73
ST
PROPOSED STORM DRAINAGE STRUCTURES 00 40 LF 24"
ST
RIM 613.91 ST W INV 609.38 3.00% NE INV 610.63
39 LF 12" AND ASSOCIATED PIPING ARE SHOWN FOR HDPE @
ST
SW INV 611.91
ST
INFORMATIONAL PURPOSES ONLY AND WILL ST 0.63% CB 38
ST
HDPE @00
ST
+ BE DESIGNED AS PART OFFFUTURE
UTU
ST
14
1.00% RIM 615.03
STOP
ST
137 LF 18" DEVELOPMENT PHASESR RE E INV 609.13 21 LF 18"
ESTA DR CB 18
ST
HDPE @
CB 2 URA IVE-T HDPE @
ST
SW INV 611.81
ST
1.00% PROPOSED PIPE CROSSING: 1 RIM 614.38
RIM 614.45 NT, H 9 +
NW INV 609.13 00 0.52%
2,30 RU 8" SAN. INV= 604.55 NW INV 608.34
ST
00
16+ST
N INV 611.64
ST
ST
0 SF 24" STORM INV=609.25 95 LF 24"
ST
CB 4
West Seneca New York
ST
W INV 611.64 305 LF 48" HDPE @ CB 19
RIM 613.70 ST CB 37
13+00 ST MH #1 HDPE @ 0.73% RIM 615.03 RIM 614.38 PROPOSED PIPE CROSSING:
N INV 610.54
ST
NE INV 612.02 SE INV 608.23
ST
ST 0.50%
ST
ST
NE INV 611.52 RIM 612.93 CB 36 8" SAN. INV= 605.10
© CARMINA WOOD DESIGN
ST
ST SW INV 606.43 ST 21 LF 12" NW INV 608.23 18" STORM INV=608.15
SE INV 610.54 RIM 614.04
ST
ST E INV 606.43 HDPE @ 18+
ST
ST SE INV 608.44 00
STOP
ST
1.00% 48 LF 18" 614
ST
STOP SW INV 608.44
ST
ST
HDPE @
STOP
ST
ST 613
75 LF 18"
ST
0.48% 608
ST
ST
HDPE @ ST 48 LF 30" 612
1.01% ST ST HDPE @ CB 20
ST
604 611 RIM 614.22
0.64%
ST
ST
ST END SECTION 61 17+0 33 LF 12" NW INV 612.22
W/ RIPRAP PROPOSED 0PIPE CROSSING: 0
ST ST
609 HDPE @
END SECTION
0
STOP FOR 3.70%
1:4.
0
PROPOSED STORM DRAINAGE STRUCTURES 8" SAN. INV= 605.67
ST
1.6%
0
ST
W/ RIPRAP
15+
AND ASSOCIATED PIPING ARE SHOWN
ST 608
36" STORM INV=608.20 PROPOSED PIPE CROSSING:
21 LF 30" 1:4.
ST
ST
ST
INFORMATIONAL PURPOSES ONLY AND WILL FOREBAY 8" SAN. INV= 606.18
ST
HDPE @ 0
604
BE DESIGNED AS PART OF FUTURE
608
STOP
ST (1,250 CF) 18" STORM INV=608.30
STOP ST DEVELOPMENT PHASES
STOP 0.62% ST
2.0%
607 47 LF 18" 16+ 171 LF 18"
00
ST
ST
CB 35
ST
ST 15' AQUATIC BENCH
604 HDPE @ ST HDPE @
RIM 614.04 0.84%
ST
ST RIP-RAP PILOT 0.99% ST
NE INV 608.31
Date
CHANNEL
2.1%
606
ST
608
ST
ST
ST SW INV 608.31 1:6.
STOP
STOP END SECTION 7 END SECTION WITH RIPRAP,
END SECTION
ST
ST FOREBAY W/ RIPRAP ST
W/ RIPRAP 1:3. (1,250 CF) INV. 608.00. REFER TO
7
605 PROPOSED PIPE CROSSING:
1:6.
INV 607.95 0
ST
ST
15+ 18" STORM INV= 612.60
ST
ST PLANS BY OTHERS.
ST FOREBAY PROPOSED STORMWATER 604 CB 21
RIM 614.22
ST
00
42" STORM INV=608.60
60
(1,250 CF) 608 604
8
603 SW INV 611.00 ST
ST
ST
MANAGEMENT AREA
ST
00
1.1%
0
SE INV 611.00
14+
6
WET POND (50,000 CF) 02
1:3.
ST ST
ST
NW INV 608.47 CB 22
2.0%
ST 21 LF 30" END SECTION PERMANENT POOL RIM 615.96
ST
ST
604
ST
HDPE @ W/ RIPRAP ELEVATION 607.80 601.80 SW INV 612.43
ST RIP-RAP PILOT
No. Description
ST
0.67% ST CHANNEL BOTTOM OF RIP-RAP PILOT FOREBAY NE INV 612.43
BASIN (TYP.)
1:3.0
(1,250 CF)
ST
ST
ST
CHANNEL
INFORMATIONAL PURPOSES ONLY AND WILL
REVISIONS:
1:6.7
ST
ST 605 604 603 602
606 0.2%
607
2,92
604
STOP ST 609 608 PROPOSED PIPE CROSSING:
STOP CB 34 611 610
STOP 90 LF 30" 612 8" SAN. INV= 607.02 5 G.
608
STOP STOP RIM 614.04 614 613
CB 33
RET S.F.
1:4.0
STOP HDPE @ 42" STORM INV=608.44
ST
10' WIDE BERM END SECTION WITH RIPRAP, 1:4.
ST
W INV 608.87 STOP RIM 614.04 0
SW INV 608.87 NE INV 608.73
0.81% 40' WIDE
SPILLWAY 614
INV. 608.00. REFER TO
PLANS BY OTHERS.
AIL
T00
SE INV 608.73 EL. 613.50
ST
13S+
STOP
ST ST
STOP
ST ST ST ST ST ST
ST
ST
101 LF 24" ST
ST
CBSTOP HDPE @
ST
32 ST
RIM 615.14 STOP 0.65% PROPOSED STORMSTOP
DRAINAGE STRUCTURES
ST
614.50
STOP
ST
614.50
ST
ST
W INV 609.52 AND ASSOCIATED PIPING ARE SHOWN FOR TOP OF TOP OF
Sealed 07/20/2026
ST
E INV 609.52 45 LF 24" BASIN (TYP.)
ST
ST
INFORMATIONAL PURPOSES ONLY AND WILL ST BASIN (TYP.)
HDPE @ BE DESIGNED AS PART OF FUTURE ST
ST
0.57% DEVELOPMENT PHASES ST
ST
ST
CB 31
ST
RIM 615.64
WET POND PLAN & DETAIL
SCALE: 1"=40'
TOP OF BASIN EL. = 614.50 4 APPROX. EXISTING GRADE
4 1 4
100 YR EX. VS. 100 YR PRO. EL. (Qf) = 612.22 1
1 SPILLWAY EL. = 613.50
25 YR EX. VS. 25 YR PRO. EL. (Qf) = 611.43 DRAWING NAME:
10 YR EX. VS. 10 YR PRO. EL. (Qp) = 610.89
1 YR PRO. EL. (CPv) = 609.62
Wet Pond Plan
& Detail
WET POND (50,000 CF) 3 FOREBAY 1 3
3 PERMANENT POOL 3 1 (1,250 CF) REFER TO PLAN FOR PIPE
1 ELEVATION 607.80 1 INV. 608.00 SIZE, LENGTH, AND SLOPE.
EX. 58" X 94"" STORM PIPE 675 LF 48" HDPE @ 0.50% MITERED END SECTION 15' AQUATIC BENCH
INV. = EL. 603.56 WITH CONC. EARS INLET 15' AQUATIC BENCH (15% SLOPE)
INV. 607.95 (15% SLOPE) Date: 07/20/26
EX. ST. M.H. Drawn By: C. Wood
RIM 697.01
Scale: As Noted
SECTION THROUGH WET POND
S 48" INV 604.56 (NEW)
NE EX. 58" X 94" INV 603.56 DRAWING NO.
SW EX. 42" INV. 604.56 (TO BE PLUGGED)
NOT TO SCALE
C-304
Project No: 24-4113
Page 1061 of 1174
Page 1062
GRADE
6" TOPSOIL (MIN.) FRAME AND GRATE SHALL BE NEENAH R-1792-FG OR R-1792-FL FRAME AND GRATE SHALL BE NEENAH R-1792-FG OR R-1792-FL W/"STORM" CAST IN
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
NOTE:TO BE USED IN W/"STORM" CAST IN COVER IF SOLID COVER IS SPECIFIED, HEAVY COVER IF SOLID COVER IS SPECIFIED, HEAVY DUTY BICYCLE PROOF FRAME AND GRATE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
TRENCH WIDTH
Greensboro
NYSDOT RIGHT-OF-WAY DUTY BICYCLE PROOF FRAME AND GRATE TO BE USED IN PARKING TO BE USED IN PARKING LOT AREAS UNLESS OTHERWISE SPECIFIED
(I.D. + 24") LOT AREAS UNLESS OTHERWISE SPECIFIED 8" DIA. INLINE YARD DRAIN WITH
24" DIA. "STANDARD" GRATE
2 8" STAND. 24" DIA.
GRADE STANDARD
EXCAVATED FROM TRENCH
BACKFILL WITH MATERIAL
TRENCH WIDTH
(I.D. + 24")
RISER RINGS W/GASKET
AS REQUIRED RISER RINGS W/GASKET
12" (I.D.) 12" AS REQUIRED 6" HDPE PIPE
2
Utica
TOP SLAB IS
8"
TYP.
STEEL REINFORCED TO MEET
12"
12"
OR EXCEED HS-20 LOADING.
ECCENTRIC CONE
1
Buffalo
12"
(IF SPECIFIED)
(I.D.) 12"
72" DIA. MIN.
SECTION
. OR AS REQ'D
DIA
O.D.
TOP OF PIPE ZONE
)
D.
(I.
6" HDPE 90 DEGREE ELBOW
12"
DET. A (REPLACE WITH TEE FOR INLINE DRAINS)
(6"MIN.) 1 NOTE: ECCENTRIC CONE SECTION SHALL BE USED UNLESS ALTERNATE TOP SLAB
1/3 I.D. (12"MAX.) DEPTH WARRANTS TOP SLAB PER MANUFACTURER
.
DIA
O.D.
)
D.
6" HDPE PIPE, SEE PLAN FOR SLOPE
(I.
NOTES: (6"MIN.) NOTE:
A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS 1/3 I.D. (12"MAX.) SEE TYPICAL TRENCH SECTION FOR BEDDING REQUIREMENTS
RECOMMENDATIONS. GASKETED STEEL REINFORCED COPOLYMER
JOINT (TYP.) POLYPROPYLENE PLASTIC STEP
B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING.
C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL TYPICAL YARD DRAIN DETAIL
RISER SECTION
PLACEMENT AND MAXIMUM PAY LIMITS. NOTES:
(IF REQ'D)
A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS NOT TO SCALE
D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL RECOMMENDATIONS.
BE USED IN ALL UNSHEETED TRENCH AREAS. B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING. 72" DIA. MIN. 5" MIN. OR
OR AS REQ'D AS REQ'D
West Seneca Exchange
EXTERIOR CLEANOUT @ GRADE
MATERIALS C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL DETAIL A J.R. SMITH #4251-U W/ VANDAL-
PLACEMENT AND MAXIMUM PAY LIMITS. PROOF SCREWS OR APPROVED EQUAL CAP
PIPE BEDDING MATERIAL (NYSDOT 1985 EDITION) D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL
BE USED IN ALL UNSHEETED TRENCH AREAS. TOP COURSE
Slade Ave, Ridge Rd & Orchard Park Rd
1 NO. 1 CRUSHED STONE OR CRUSHED GRAVEL WITH A GRADATION CONFORMING WITH NYSDOT SECTION 703-02. THE MATERIAL EXPANSION JOINT
BINDER
2"
SHALL BE WELL GRADED WITH NO PARTICLES LARGER THAN ONE INCH AND HAVING A MAXIMUM GRADATION MEETING THE LIMITS
DESCRIBED IN THE SPECIFICATIONS. THE BEDDING SHALL BE COMPACTED IN 6" LIFTS WITH EQUIPMENT ACCEPTABLE TO THE PIPE GENERAL NOTES: WITH FIBERBOARD
12" MIN.
MATERIALS
MANUFACTURER. 1. REINFORCED STEEL TO CONFORM TO LATEST A.S.T.M. A185 STONE BASE 4000 PSI CONCRETE ENCASE
PIPE BEDDING MATERIAL (NYSDOT 1985 EDITION) SPEC. 0.12 SQ. IN./LINEAL FT. AND 0.12 SQ. IN. (BOTH WAYS)
PIPE, SEE PLAN TO FULL DEPTH OF FRAME
IN BASE SLAB.
NO SLAG SHALL BE ALLOWED FOR MATERIAL 1 NO. 1 CRUSHED STONE OR CRUSHED GRAVEL WITH A GRADATION CONFORMING WITH NYSDOT SECTION 703-02. THE MATERIAL
1 FOR SIZE & INVERT
SHALL BE WELL GRADED WITH NO PARTICLES LARGER THAN ONE INCH AND HAVING A MAXIMUM GRADATION MEETING THE LIMITS 2. CONCRETE COMPRESSIVE STRENGTH - 4000 PSI MINIMUM.
BASE SECTION
TYPE 2 CRUSHED STONE OR CRUSHED GRAVEL WITH A GRADATION CONFORMING WITH NYSDOT SECTION 304-2.02 TYPE 2. THE DESCRIBED IN THE SPECIFICATIONS. THE BEDDING SHALL BE COMPACTED IN 6" LIFTS WITH EQUIPMENT ACCEPTABLE TO THE PIPE
2 6" FOR IN-LINE CLEAN-OUT
MATERIAL SHALL BE WELL GRADED WITH NO PARTICLES LARGER THAN TWO INCHES AND HAVING A MAXIMUM GRADATION MEETING THE MANUFACTURER. 3. MANHOLE DESIGN SPECIFICATIONS TO CONFORM TO LATEST
SEE PLANS
12" MIN.
LIMITS DESCRIBED IN THE SPECIFICATIONS. THE BEDDING SHALL BE COMPACTED IN 6" LIFTS WITH EQUIPMENT ACCEPTABLE TO THE PIPE A.S.T.M. C478 SPEC. FOR PRE-CAST REINFORCED CON-CRETE SELECT FILL 8" FOR END OF LINE LAMPHOLE
VARIES
MANUFACTURER. MANHOLE SECTIONS.
NO SLAG SHALL BE ALLOWED FOR MATERIAL 1
West Seneca New York
4. SINGLE POUR MONOLITHIC BASE SECTION.
2 BACKFILL MATERIAL SHALL BE NATIVE SOIL CONTAINING NO UNSUITABLE MATERIAL COMPACTED IN 6" LIFTS.
NO SLAG SHALL BE ALLOWED FOR MATERIAL 2
© CARMINA WOOD DESIGN
5. MANHOLE TO BE COATED ON OUTSIDE WITH BITUMASTIC
8" THK.
SEALER.
FLOW
STORM SEWER TRENCH SECTION STORM SEWER TRENCH SECTION
IN PAVED AREAS IN UNPAVED AREAS SEE PLANS FOR
6" MIN.
SEWER SIZES
NOT TO SCALE NOT TO SCALE FRAME OD + 2'
COMPACTED TYPE 2 R.O.C. STONE BASE,
NYSDOT ITEM 304.02
6'
STANDARD END SECTIONS
TYPICAL STORM MANHOLE DETAIL LAMPHOLE/CLEANOUT IN PAVEMENT/SIDEWALK
NOT TO SCALE
NOT TO SCALE
Date
2'
RIM ELEV. - VARIES 4" Ø PERFORATED HDPE DRAIN PIPE, EXTEND 5' FROM CB, CAP END PIPE SHALL
HEAVY DUTY FRAME BE SURROUNDED WITH 4" MIN. NYSDOT NO.1 WASHED STONE OR GRAVEL ON
OF PIPE
(SEE PLAN), PROVIDE
WIDTH
STORM PIPE W/END SECTIONS AND GRATE, NEENAH RISER SECTIONS TO ALL SIDES, SLOPE OF PIPE SHALL MATCH SUBGRADE SLOPE (TYP. ON 4 SIDES
(SEE PLANS FOR SIZE AND TYPE) OF CB, NOT REQUIRED ON SIDES WHERE PIPES ENTERING/EXITING HAVE 2' OR
R4832B, HS20-44, ACHIEVE RIM ELEV.
BICYCLE PROOF LESS COVER)
TOP OF PAVEMENT
2'
No. Description
TOP OF BANK
REVISIONS:
OF BANK
BOTTOM
2'-0"
PAVEMENT SUBBASE
PLAN VIEW
6" 2'-0" * 6"
PRECAST CONCRETE SURROUND STONE WITH GEOTEXTILE DRAINAGE
CATCH BASIN UNIT, MIN.
STANDARD END SECTIONS FABRIC, TYPAR OR EQUAL
KISTNER CB-2436
OR EQUAL INVERT ELEV.-
3' MIN. PLACE STONE FILL VARIES
1 HALFWAY UP THE SIDE OF STORM PIPE-
PIPE UNLESS OTHERWISE NOTED SEE PLAN SIZE VARIES
(SEE PLAN)
12" OF STONE FILL
SEE PLAN FOR TYPE
12" SUMP
Sealed 07/20/2026
NEW CULVERT W/END SECTIONS
(SEE PLANS FOR SIZE AND TYPE) 6'-0"
6"
6" COMPACTED NYSDOT
TYPE 2 R.O.C. STONE BASE
NYSDOT ITEM 304.12
UNDISTURBED
EARTH *NOTE: USE UP TO 18" PIPE, FOR LARGER PIPES USE STORM MH, SEE DETAIL
PIPE BEDDING, SEE
TRENCH SECTION
ELEVATION
NOTE: LIMITS OF STONE SHOWN ARE
MINIMUMS, PLAN MAY INDICATE GREATER
LIMITS TYPICAL PRECAST CATCH BASIN
NOT TO SCALE
DRAWING NAME:
TYPICAL PIPE OUTLET W/ END SECTION & RIP RAP Storm Drainage
NOT TO SCALE Details
Date: 07/20/26
Drawn By: C. Wood
Scale: As Noted
DRAWING NO.
C-305
Project No: 24-4113
Page 1062 of 1174
Page 1063
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
(SHEET C-402)
Greensboro
(DESIGNED
BY OTHERS)
RS)
THE
(SHEET C-401)
YO
(PLA )
NS B
02
(C-1
(SHEET C-403)
Utica
LINE
LINE
SHEET LOCATION MAP
CH
CH
MAT
Buffalo
MAT
SCALE: N.T.S.
ST
OP
OP
ST
FUT
URE
1
80,3 -STOR
OP
ST 00 S Y RE
.F. TAIL
WV
DN
NOTE:
FUTURE DEVELOPMENT AREAS SHOWN DN
ON THIS PLAN SET ARE CONSIDERED 6 (N
W)
West Seneca Exchange
4.7 W)
=61 6 (S
OUT 14.8
TO BE CONCEPTUAL ONLY. INV IN=6 5
INV 619.8
TF= H-7
SM
WV .00
%
Slade Ave, Ridge Rd & Orchard Park Rd
@2
PP E)
6" H 0 (N
4.1 9LF
U T =61
VO
G IN
BLD
ST
ST WHO PROPO
LE SED
158 SALE R
-BW
-BW
76
,000 ETA
-BW
76
%
.00
@2
ST
-BW
W)
76
PP
STOP 0 (S
SF IL
"H
14.6 F6
76
27L
S
6
TOP UT=
ST
O
INV
LDG B
ST
%
.00
51L
@2 PP
W)
MATCH LINE (C-102)
F8
.60
(S 6" H
5LF
" PV
4
ST
=61
OUT
C@
INV
NOTE:
G
ST BLD
0.5
W)
0%
5 (N )
) 3.9 (NE
IO
(NW =61 .05 1
MATCH LINE (C-101) OFFSITE IMPROVEMENTS SHOWN DESIGNED BY
.60 % % OUT =614 20.2
613
PAT
0 2.0
0 INV V IN TF=6 MH-1
UT= @ 2.0
West Seneca New York
@ IN S
FUT VO
G IN F 6" H
PP HPP 6"
356
D F
L 11L
UR
B 6L
OTHERS. REFER TO OFFSITE PLANS BY OTHERS W)
LF 8
130 E RETA
0 (N )
ST
ST
ST
3.6 (NE
" PV
=61 .11 E)
TOP
85L
OUT =614 0 (S
C@
S INV V IN =613.7 20.17
9,10 'x70' IL
STOP
F8
IN IN F=6 H-2
1.8
" PV
IN V T SM
3%
FU
C@
RES TURE D 0 SF )
0.5
(SW
STOP
.60
0%
TAU RIVE 615
© CARMINA WOOD DESIGN
N
RAN -TH ST ST WV
G IN
VO
UT=
.00
% W)
IO
UT
CA
IO
7 (N )
T 4, RU BLD @9 3.0 (NE
ST
PP
CA
=61 .17 E)
PAT
963
H
UT
"
F6 OUT =613 7 (S
IO
27L INV V IN =613.1620.21
SF
N
%
STOP
.00 IN IN F= H-3
@2 IN V T SM
PP
N
"H
IO
F6
UT
74L
CA
STOP CA
UT
IO
N
STOP ST
STOP
S TOP ST
ST
302LF 8" PVC
@ 0.50%
ST
ST
113LF %
.50
CA
ST 8" PVC 0
UT
GV
C@
FU ST ST @ 0.50%
IO
" PV
N
)
LF 8
2,50 TURE
9 (N 200
7.9 (S)
=60 .09 E) )
ST
OUT 608 3 (S 0 (N
N
IO
INV V IN= 608.0 6.65 9.6 W)
UT
0 =60 0 (S E)
CA
OUT 09.7 4 (S
ST IN IN= =61 -8
BAN G.S.F.
STOP FU
V T F MH INV IN=6 611.8 9.02
ST
IN S
ST WV
ST
RES TURE D
INV V IN= TF=61 H-6
220
IN SM
K
N
IO
LF 8
UT
TAU RIV
CA
" PV
ST
ST RAN E-TH
C@
ST T 2, RU WV
E)
380
STOP
0.5
0 (N
STOP 0.7 W) WV
0%
SF =61 0 (S
OUT 10.8
INV IN=6 4
ST ST V
IN 61 9
TF= H-5
.4 CA
UT
IO
N
STOP
SM
STOP
ST
ST
CA
0%
UT
STOP 0.5
IO
STOP ST C@
N
V
8" P
STOP 214
LF
N
IO
UT
ST
CA
FU
REST TURE D
STOP
ST
ST
ST
AUR RIVE STOP E)
7 (N
ANT -THR
1.8 E)
=61 7 (S
ST , 2,3 U
OUT 11.9
INV IN=6 3
00 S INV 619.8
=
CA
F
F
T H-4
UT
SM
IO
N
ST
ST
N
ST
IO
STOP
UT
ST
CA
ST
GV
STOP
STOP STOP ST
STOP
ST
Date
621
ST
ST
CA
ST
UT
IO
N
CA
UT
IO
N
ST
N
IO
UT
CA
N
STOP
IO
UT
CA
ST
STOP
STOP STOP
ST
ST
ST
ST
ST
CA
UT
IO
N
STOP
STOP
ST
ST
N
IO
ST
UT
CA
ST PROPOSED STORMWATER
ST
ST
ST
MANAGEMENT AREA
GV
ST
ST
ST
ST ST
ST
ONLY ST FU
ST
No. Description
ONLY
STOP STOP STOP STOP 2,92 TURE
STOP 5
RET G.S.F.
STOP STOP STOP STOP
ST
STOP
AIL
REVISIONS:
ST
STOP
ST
ST
ST ST ST
STOP
ST
STOP ST ST
STOP
STOP
STOP
ST
ST ST
STOP
ST
ST
ST
ST
FU ST
RES TURE D
ST TAU RIV
STOP
ST
FUTURE RETAIL FUTURE RETAIL FUTURE RETAIL
ST ST ST ST RAN E-TH
T 2, RU
MAT
STOP
ST ST
110'x200' FUTURE RETAIL 380
SF
CH
110'x200' 110'x200' 110'x200' LINE
ST
22,000 SF MAT
ST
22,000 SF 22,000 SF NOTE: STOP
(PLA
22,000 SF ST CH
ST
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN LINE NS B
NOTE: FUTURE SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. (C-1 YO
RESTAURANT FUTURE RETAIL FUTURE RETAIL 03) THE
ST FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN
100'x100' 100'x100' 100'x100'
RS)
ST
SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. 10,000 SF EX. OFFICE
ST 10,000 SF 10,000 SF 7,980 SF
ST
ST
ST
ST ST ST ST STOP
ST ST ST ST STOP
Sealed 07/20/2026
ST ST ST ST ST ST ST
ST
STOP
GV
GV
(C-1 )
01
03)
(C-1
LINE
LINE
PROPOSED UTILITY LEGEND UTILITY NOTES:
CH
CH
MAT
PROPOSED STORM SEWER ST
MAT
1. FOR ALL SANITARY SEWERS, INSTALL SELECT FILL IN PAVED AREAS, EXTEND 5' MIN. BEYOND PAVEMENT
UTILITY PLAN PROPOSED SANITARY SEWER 6" SA 2.
LIMITS
BUILDINGS TO HAVE INVERT ELEVATION
5' MIN.BELOW F.F.E. OF THE BUILDING. PIPE TO
6" SDR-35
BE DRAWING NAME:
PVC @ 1.0% MIN. WITH MIN 4' OF COVER. ADD CLEANOUTS @ 90' MAX. SPACING
6" LATERALS
FOR OVER
SCALE: 1"=100' 90' IN LENGTH. Utility Plan
PROPOSED WATERLINE 1" W
3. Overall
COORDINATE GAS & ELEC. METER BANK LOCATIONS ON BUILDINGS WITH M.E.P. PLANS & UTILITY CO.'S.
PROPOSED CATCH BASIN CB 4. COORDINATE LOCATION OF CTV & TELEPHONE SERVICE TO BUILDINGS WITH M.E.P. PLANS AND UTILITY
CO.'S.
PROPOSED YARD DRAIN YD 5. ANY EXISTING UTILITIES WHICH ARE TO BE ABANDONED AND FALL UNDER PAVEMENT OR BUILDINGS
SHALL BE REMOVED VS. BEING ABANDONED UNLESS THOSE UTILITIES ARE FILLED WITH FLOWABLE Date:
FILL. 07/20/26
PROPOSED MANHOLE MH Drawn By: C. Wood
6. A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES OF VERTICAL SEPARATION MUST BE MAINTAINED
BETWEEN ALL SANITARY SEWER AND WATER SERVICES. Scale: As Noted
PROPOSED HYDRANT ASSEMBLY
DRAWING NO.
7. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM, SANITARY) THAT CROSS
THROUGH CONCRETE AND ASPHALT PAVEMENT AREAS.
PROPOSED GATE VALVE
NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A
3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE
GV
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
C-400
100 0 100 200Ft. Project No: 24-4113
COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE
BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK. 100'
Page 1063 of 1174
Page 1064
G.V. AT CONNECTION TO EX. 6" WATERMAIN
ST SANITARY LATERAL FROM PROPOSED
ST
BUILDING; TO BE INSTALLED DURING
FUTURE PHASE OF CONSTRUCTION PROPOSED 6"
MATCHLINE (C-402) ST
PROP. CAP TO BE INSTALLED GATE VALVE
PROPOSED 10" AWWA C-900 PVC
ST
MATCHLINE (C-401) JUST AFTER 6" GATE VALVE AS COMBINED WATER SERVICE (5' MIN. COVER)
IO
APPROXIMATE LOCATION OF FUTURE PROPOSED 10"x10"x8" TEE
ST SHOWN (FOR FUTURE USE)
ST
PAT
WATER SERVICE TO PROPOSED
FUT
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
PROPOSED PIPE CROSSING:
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
BUILDING; TO BE INSTALLED DURING PROPOSED 10" GATE VALVE
ST
URE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
(SHEET C-402) 10" SAN. INV=603.00 ST
FUTURE PHASE OF CONSTRUCTION PROPOSED
Greensboro
ST
48" STORM INV=605.05 CONTRACTOR TO INSTALL PROPOSED 10" G.V.
130 RETA
TOP PROPOSED 10" GATE
(DESIGNED S ST
VALVE AT CONNECTION TO EX. 10" WATERMAIN
ST
ST
9,10 'x70' IL
PROPOSED 10" GATE VALVE STOP 10" GATE
BY OTHERS) VALVE
ST
CURRENT FU ST
0 SF 10"x10"x6" EXISTING WATERMAIN TO REMAIN & BE REUSED
RES TURE D
ST
PROPOSED MAINTAIN 18" VERTICAL WITHIN SITE. ALL EXISTING TENANTS SHALL
ST
STOP
SHEET TAU RIVE ST TEE CLEARING AT ALL HAVE CONSTANT, UNINTERRUPTED WATER
RAN -TH ST
STORM/SANITARY SERVICE DURING CONSTRUCTION
IO
T , RPROPOSED
ST
ST
963 U
CONTRACTOR TO4INSTALL
ST
CROSSINGS, TYP.
PAT
10" G.V. ST
(SHEET C-403) SFWATERMAIN
ST
Utica
STOP
AT CONNECTION TO EX. 10" PROPOSED 10" GATE VALVE TO BE
PROPOSED PIPE CROSSING: PROP. 6" AWWA C-900 PVC PROP. 8" INSTALLED ON EX. 10" WATER SERVICE
ST
8" SAN. INV=603.15 ST GATE VALVE AS SHOWN FOR FUTURE CONNECTION
COMBINED SERVICE (5' MIN. COVER) STOP
SHEET LOCATION MAP SAN MH 5 STOP 48" STORM INV=605.56 ST
SAN MH 12
ST
RIM 613.81
PROPOSED PIPE CROSSING:TOP ST
ST
S
ST
ST
Buffalo
ST RIM 616.78
ST
SE INV 602.84 OP PROPOSED 8" AWWA C-900 PVC COMBINED
ST
8" SAN. INV=603.13 PROPOSED 6" WATER SERVICE (5' MIN. COVER) NW INV 607.33
SCALE: N.T.S. SW INV 602.84 24" STORM INV=608.20
ST ST
GATE VALVE
NW INV 602.74
ST
ST
PROP. CAP TO BE INSTALLED APPROXIMATE LOCATION OF
ST PROP. CAP TO BE
ST
ST
FUTURE WATER SERVICE TO
ST
ST 113LF
ST JUST AFTER 6" GATE VALVE AS INSTALLED JUST
" PVC @ 8
ST
PROPOSED BUILDING; TO BE
0.50%
FU 200 LF
ST
396 LF ST SHOWN (FOR FUTURE USE) AFTER 10" GATE
ST
2,50 TURE
ST
10" SDR-35 INSTALLED DURING FUTURE ST
APPROXIMATE LOCATION OF FUTURE 8" SDR-35 VALVE AS SHOWN
ST
ST
PROPOSED PHASE OF CONSTRUCTION
ST
ST
PVC @ 0.40% ST
PVC @ 0.40% (FOR FUTURE USE)
0 G.
ST
SANITARY LATERAL FROM PROPOSED ST
ST 8"x8"x6" TEE APPROXIMATE LOCATION OF FUTURE
STOP FUTSANITARY LATERAL FROM PROPOSED
ST
BAN S.F. BUILDING; TO BE INSTALLED DURING ST
FUTURE PHASE OF CONSTRUCTION ST URE TO BE INSTALLED DURING
RES BUILDING;
ST
ST
K
ST
ST
ST
ST
TAFUTUREDRIV OF CONSTRUCTION OFFSITE IMPROVEMENTS TO
ST U PHASE E
RAN -TH CONNECT TO EXISTING SAN
ST
ST ST
ST
T 2, RU MANHOLE 12 AT INV. 607.43.
ST
ST
380
STOP
ST
ST
STOP REFER TO PLANS BY OTHERS.
ST ST
ST
SF
ST
ST
CONTRACTOR TO PLUG ST
STOP
ST
EXISTING EAST INVERT; ST
APPROXIMATE LOCATION OF FUTURE ST
ST
REFER TO DEMOLITION PLAN PROPOSED 8" AWWA C-900
STOP
ST
APPROXIMATE LOCATION OF FUTURE SANITARY LATERAL FROM PROPOSED ST
SANITARY LATERAL FROM PROPOSED BUILDING; TO BE INSTALLED DURING PVC COMBINED WATER
SAN MH 3 STOP STOP ST
SERVICE (5' MIN. COVER)
ST
BUILDING; TO BE INSTALLED DURING FUTURE PHASE OF CONSTRUCTION
ST
RIM 614.36 FUTURE PHASE OF CONSTRUCTION SAN MH 4 STOP ST
West Seneca Exchange
SAN MH 8
ST
ST
S INV 601.31 RIM 612.66 ST
ST
RIM 613.96
ST
NW INV 601.21 SE INV 601.94 FU MAINTAIN 18" VERTICAL CLEARING AT
ST
RES TURE D
STOP
ST SW INV 604.52
ST
ALL STORM/SANITARY CROSSINGS, TYP.
N INV 601.84
ST
TAU RIV NE INV 604.42
STOP
ST
ST
ST
RAN E-TH
Slade Ave, Ridge Rd & Orchard Park Rd
ST
ST 133 LF T, 2 RU
ST
,300 PROPOSED PIPE CROSSING:
ST
ST
ST
10" SDR-35 ST
ST
SF 8" SAN. INV= 604.55
ST
PVC @ 0.40% ST 24" STORM INV=609.25 209 LF
PROPOSED PIPE CROSSING:
PROPOSED PIPE CROSSING: 8" SDR-35
ST
10" SAN. INV=601.18 ST
ST PVC @ 0.85%
ST
ST
18" STORM INV=611.95 232 LF 8" SAN. INV= 605.10
STOP
ST
ST ST
8" SDR-35 18" STORM INV=608.15
ORCHARD PARK ROAD IMPROVEMENTS SHOWN
ST
ST PVC @ 0.40%
ST
ST
STOP
DESIGNED BY OTHERS. REFER TO OFFSITE ST
ST
STOP STOP
ST
PLANS BY OTHERS ST
STOP
ST
ST PROPOSED 6" GATE VALVE
ST
ST
ST
ST
ST ST ST PROP. 6" AWWA C-900 PVC SAN MH 9
West Seneca New York
APPROXIMATE LOCATION OF FUTURE SERVICE TO ST COMBINED SERVICE (5' MIN. COVER) RIM 613.17
ST
ST
ST
PROPOSED BUILDING; TO BE INSTALLED DURING ST PROPOSED SW INV 605.55
FUTURE PHASE OF CONSTRUCTION ST ST 8"x8"x6" TEE SE INV 605.55
© CARMINA WOOD DESIGN
STOP NE INV 605.45
ST
ST ST
ST
PROPOSED PIPE CROSSING:
ST
ST
ST
ST
INV. PROP. CAP TO BE INSTALLED 8" SAN. INV= 605.67
STOP
599.80 JUST AFTER 6" GATE VALVE AS
ST
STOP ST
STOP
36" STORM INV=608.20
ST
SHOWN (FOR FUTURE USE) ST
ST
ST
ST
ST
ST
320 LF ST
ST
ST
10" SDR-35
ST
ST
ST
STOP
PVC @ 0.40% PROPOSED 8" AWWA C-900 STOP PROPOSED PIPE CROSSING:
ST
ST
PVC COMBINED WATER 8" SAN. INV= 606.18
ST
ST
ST
ST
ST SERVICE (5' MIN. COVER) 18" STORM INV=608.30
ST PROPOSED STORMWATER
ST
ST
MANAGEMENT AREA
ST
ST
ST
ST ST
ST
ST
ST
Date
ST
ST
ST ST
ST
ST
ST
ST
SAN MH 1 ST ST
(DOGHOUSE) FUTURE FIRE APPROXIMATE LOCATION OF MAINTAIN 18" VERTICAL CLEARING AT ST
ST
RIM 615.82 HYDRANT FUTURE 6" COMBINED SERVICE ALL STORM/SANITARY CROSSINGS, TYP. APPROXIMATE LOCATION OF
STOP STOP FUTURE FIRE ST FUTURE 6" COMBINED SERVICE
S INV 599.64 STOP STOP HYDRANT
E INV 599.54 STOP STOP 45° BENDS
ST
STOP STOP
ST
W INV 599.54
ST
STOP PROPOSED 6" GATE VALVE
FUTURE FIRE
No. Description
SAN MH 2 HYDRANT
ST
ST
APPROXIMATE LOCATION OF FUTURE WATER
STOP
RIM 614.70 PROPOSED CAP TO BE INSTALLED JUST AFTER SERVICE TO PROPOSED BUILDING; TO BE INSTALLED
REVISIONS:
48 LF ST ST
STOP
SE INV 599.93
ST
6" GATE VALVE AS SHOWN (FOR FUTURE USE) DURING FUTURE PHASE OF CONSTRUCTION
ST ST ST ST ST
10" SDR-35
ST
N INV 599.83 ST
ST
PVC @ 0.40% ST
STOP
ST
ST
PROPOSED 6" GATE VALVE STOP PROPOSED CAP TO BE INSTALLED ST
STOP
ST
ST
JUST AFTER 6" GATE VALVE AS ST
PROPOSED 6" AWWA C-900 PVC COMBINED SHOWN (FOR FUTURE USE) ST
ST
ST
ST
WATER SERVICE (5' MIN. COVER) ST
ST
ST
01)
PROPOSED 6" AWWA C-900 PVC COMBINED
ST
WATER SERVICE (5' MIN. COVER)
ST
(C-4
PROPOSED 8" AWWA C-900 PVC COMBINED
WATER SERVICE (5' MIN. COVER)
ST
(2) PROPOSED 8"x8"x6" 3-WAY TEE
STOP
FUTURE RETAIL
INE
ST ST ST ST
ST
FUTURE RETAIL
ST ST ST ST ST
FUTURE RETAIL
ST ST
STOP
ST ST
CHL
ST
FUTURE RETAIL
ST ST ST ST
ST
ST ST
03)
110'x200' PROVIDE BENDS &
Sealed 07/20/2026
110'x200'
MAT
BLOCKING AS REQUIRED
110'x200'
(C-4
22,000 SF 110'x200'
ST
ST
22,000 SF
INE
INV.
599.23 22,000 SF 22,000 SF
CHL
PROPOSED UTILITY LEGEND
ST
PROPOSED CAP TO BE INSTALLED JUST AFTER
ST
6" GATE VALVE AS SHOWN (FOR FUTURE USE)
MAT
PROPOSED 6" AWWA C-900 PVC COMBINED SERVICE (5' MIN. COVER) ST
FUTURE PROPOSED STORM SEWER
ST
ST
ST PROPOSED 6" GATE VALVE
PROPOSED CAP TO BE INSTALLED JUST AFTER
ST
RESTAURANT
APPROX. LOCATION OF FUTURE
SANITARY LATERAL FROM PROP. FUTURE RETAIL FUTURE RETAIL
PROPOSED SANITARY SEWER 6" SA
BUILDING; TO BE INSTALLED
100'x100'
ST
APPROXIMATE LOCATION OF FUTURE WATER
ST
6" GATE VALVE AS SHOWN (FOR FUTURE USE)
PROPOSED WATERLINE100'x100'
DURING FUTURE PHASE OF
ST
SERVICE TO PROPOSED BUILDING; TO BE INSTALLED
DURING FUTURE PHASE OF CONSTRUCTION
ST 100'x100' CONSTRUCTION 1" W
ST
10,000 SF 10,000 SF CB
ST
10,000 SF
ST
ST APPROXIMATE LOCATION OF FUTURE
WATER SERVICE TO PROPOSED PROPOSED CATCH BASIN
ST
PROPOSED DRAWING NAME:
ST
ST BUILDING; TO BE INSTALLED DURING APPROXIMATE LOCATION OF FUTURE WATER
8"x8"x6"
ST
FUTURE PHASE OF CONSTRUCTION SERVICE TO PROPOSED BUILDING; TO BE INSTALLED
ST
ST ST ST ST ST ST ST
4-WAY TEE STOP DURING FUTURE PHASE OF CONSTRUCTION STOP PROPOSED YARD DRAIN YD Utility Plan
ST
ST ST ST
ST
ST ST ST ST ST ST ST ST
ST
ST ST
ST
MH
ST
ST ST ST ST ST ST ST ST PROPOSED MANHOLE
ST
ST
ST PROVIDE BENDS & ST ST ST ST ST ST ST ST ST ST
ST BLOCKING AS REQUIRED
ST
PROPOSED 6" GATE VALVE
ST
PROPOSED
APPROXIMATE LOCATION OF FUTURE SANITARY LATERAL FROM HYDRANT ASSEMBLY
PROPOSED
BUILDING; TO BE INSTALLED DURING FUTURE PHASE OF CONSTRUCTION
Date: 07/20/26
PROPOSED GATE VALVE GV Drawn By: C. Wood
Scale: As Noted
NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A
SLADE DRIVE IMPROVEMENTS SHOWN APPROXIMATE LOCATION OF FUTURE 3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE DRAWING NO.
DESIGNED BY OTHERS. REFER TO OFFSITE SANITARY LATERAL FROM PROPOSED PROPOSED 8" COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE
PLANS BY OTHERS BUILDING; TO BE INSTALLED DURING G.V. (BY ECWA)
UTILITY PLAN BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK.
FUTURE PHASE OF CONSTRUCTION
PROPOSED 8" AWWA C-900 PVC COMBINED
WATER SERVICE (5' MIN. COVER)
PROP. HOTBOX
INSULATED ENCLOSURE
PROPOSED 8" CLASS 52 DUCTILE IRON
COMBINED WATER SERVICE (5' MIN. COVER)
PROPOSED 24"x24"x8"
TAPPING SLEEVE &
VALVE (BY ECWA) SCALE: 1"=40'
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
C-401
Project No: 24-4113
40 0 40 80Ft.
40'
Page 1064 of 1174
Page 1065
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
CURRENT
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
SHEET
(DESIGNED
BY OTHERS)
(SHEET C-401)
(SHEET C-403)
Utica
SHEET LOCATION MAP
Buffalo
S T
SCALE: N.T.S.
OP
OP
ST
West Seneca Exchange
APPROXIMATE LOCATION OF EXISTING 6"
SDR-35 PVC SANITARY LATERAL FROM TOPS FUT
MARKETS TO REMAIN AND BE REUSED; URE
Slade Ave, Ridge Rd & Orchard Park Rd
COORDINATE CONNECTION WITH TOPS
1
MARKETS TO ENSURE UNINTERRUPTED
SERVICE DURING CONSTRUCTION 80,3 -STOR
SAN MH 7
00 S Y RE
P O
RIM 613.93 ST
PROPOSED PIPE CROSSING:
S INV 604.71
NW INV 604.61
PROPOSED HYDRANT ASSEMBLY
TO BE INSTALLED WITHIN FUTURE
CURBED ISLAND AS SHOWN
.F. TAIL 620
10" SAN. INV=604.50 DN
42" STORM INV=606.58
West Seneca New York
170 LF
10" SDR-35
PVC @ 1.76% APPROXIMATE LOCATION OF FUTURE SANITARY
© CARMINA WOOD DESIGN
PROPOSED 8" SDR-35 PVC SANITARY LATERAL FROM PROPOSED BUILDING; TO BE INSTALLED
0
DURING FUTURE PHASE OF CONSTRUCTION
62
189 LF LATERAL FROM EX. SANITARY
10" SDR-35 MANHOLE; COORDINATE
PVC @ 0.40% CONNECTION WITH TOPS MARKETS APPROXIMATE LOCATION OF EXISTING
TO ENSURE UNINTERRUPTED SERVICE TO BE REUSED FUTURE WATER SERVICE
DURING CONSTRUCTION TO PROPOSED BUILDING; TO BE REUSED
FOR FUTURE PHASE OF CONSTRUCTION
WV
SAN MH 6 MAINTAIN 18" VERTICAL
RIM 615.81 CLEARING AT ALL PROPOSED HYDRANT ASSEMBLY
SE INV 603.85 STORM/SANITARY CROSSINGS, TO BE INSTALLED WITHIN FUTURE
NW INV 603.75 TYP. CURBED ISLAND AS SHOWN
PROVIDE BENDS & EXISTING WATERMAIN TO REMAIN & BE
Date
BLOCKING AS CONTRACTOR TO INSTALL REUSED WITHIN SITE. ALL EXISTING ST
REQUIRED PROPOSED 10" G.V. AT TENANTS SHALL HAVE CONSTANT,
CONNECTION TO EX. 10" UNINTERRUPTED WATER SERVICE DURING ST
WATERMAIN CONSTRUCTION ST
RS)
PROPOSED 10" GATE ST
VALVE
E
ST
PROPOSED
OTH
W
10" GATE PROP. 6" AWWA C-900 APPROXIMATE LOCATION OF FUTURE SANITARY LATERAL FROM PROPOSED
-B
W
76
VALVE PVC COMBINED SERVICE PROPOSED 10" AWWA BUILDING; TO BE INSTALLED DURING FUTURE PHASE OF CONSTRUCTION
-B
Y
-BW
76
ST
NS B
PROPOSED (5' MIN. COVER) PROPOSED C-900 PVC COMBINED
ST
-BW
2)
76
PROPOSED 10" AWWA STOP
No. Description
10" GATE 10"x10"x6" WATER SERVICE (5' ST
0
76
C-900 PVC COMBINED S TOP
(PLA
(C-4
PROPOSED VALVE TEE MIN. COVER) ST
WATER SERVICE (5'
REVISIONS:
ST
MIN. COVER) 10"x10"x10" TEE ST
PROPOSED 6"
INE
INE
227 LF GATE VALVE PROPOSED ST
CHL
10" GATE
CHL
10" SDR-35
ST
PVC @ 0.40% VALVE CONTRACTOR TO INSTALL PROPOSED 6"
APPROXIMATE LOCATION OF FUTURE
MAT
G.V. AT CONNECTION TO EX. 6" WATERMAIN
MAT
ST SANITARY LATERAL FROM PROPOSED
ST
BUILDING; TO BE INSTALLED DURING
MATCHLINE (C-402) ST
FUTURE PHASE OF CONSTRUCTION PROPOSED 6"
GATE VALVE
PROP. CAP TO BE INSTALLED PROPOSED 10" AWWA C-900 PVC
ST
MATCHLINE (C-401) JUST AFTER 6" GATE VALVE AS COMBINED WATER SERVICE (5' MIN. COVER)
IO
APPROXIMATE LOCATION OF FUTURE PROPOSED 10"x10"x8" TEE
ST SHOWN (FOR FUTURE USE)
ST
PAT
WATER SERVICE TO PROPOSED
PROPOSED PIPE CROSSING: BUILDING; TO BE INSTALLED DURING FUT PROPOSED 10" GATE VALVE
ST
10" SAN. INV=603.00
48" STORM INV=605.05
ST
FUTURE PHASE OF CONSTRUCTION URE PROPOSED
ST
CONTRACTOR TO INSTALL PROPOSED 10" G.V.
130 RETA PROPOSED 10" GATE
STOP ST
VALVE AT CONNECTION TO EX. 10" WATERMAIN
ST
ST
9,10 'x70' IL
PROPOSED 10" GATE VALVE STOP 10" GATE
Sealed 07/20/2026
VALVE
ST
FU 0 SF 10"x10"x6" EXISTING WATERMAIN TO REMAIN & BE REUSED
RESTTURE D
ST
ST
PROPOSED MAINTAIN 18" VERTICAL WITHIN SITE. ALL EXISTING TENANTS SHALL
ST
STOP
TEE
AUR RIVE- ST
ST CLEARING AT ALL HAVE CONSTANT, UNINTERRUPTED WATER WV
ANT THR STORM/SANITARY SERVICE DURING CONSTRUCTION
IO
ST
ST
CONTRACTOR TO4INSTALL U
ST
CROSSINGS, TYP.
CA
,963 PROPOSED PROPOSED UTILITY LEGEND
PAT
UT
10" G.V.
IO
ST ST
SFWATERMAIN
N
STOP
AT CONNECTION TO EX. 10" PROPOSED 10" GATE VALVE TO BE
PROPOSED PIPE CROSSING: PROP. 6" AWWA C-900 PVC PROP. 8" INSTALLED ON EX. 10" WATER SERVICE PROPOSED STORM SEWER ST
N
IO
ST
UT
8" SAN. INV=603.15 ST GATE VALVE
CA
COMBINED SERVICE (5' MIN. COVER) STOP AS SHOWN FOR FUTURE CONNECTION
SAN MH 5 48" STORM INV=605.56
STOP ST
6" SA
ST
ST
S SAN MH 12
PROPOSED PIPE CROSSING:TOP ST
RIM 613.81 PROPOSED SANITARY SEWER
ST
ST ST RIM 616.78
ST
SE INV 602.84 OP PROPOSED 8" AWWA C-900 PVC COMBINED
ST
8" SAN. INV=603.13 PROPOSED 6" WATER SERVICE (5' MIN. COVER) NW INV 607.33
SW INV 602.84 ST ST
GATE VALVE
NW INV 602.74
24" STORM INV=608.20 PROPOSED WATERLINE 1" W
ST
ST APPROXIMATE LOCATION OF PROP. CAP TO BE
PROP. CAP TO BE INSTALLED ST
ST
ST
FUTURE WATER SERVICE TO
ST
ST
CA
ST JUST AFTER 6" GATE VALVE AS INSTALLED JUST
UT
ST
PROPOSED BUILDING; TO BE
FUT 200 LF
IO
ST
396 LF SHOWN (FOR FUTURE USE) AFTER 10" GATE PROPOSED CATCH BASIN CB
N
ST
ST
ST INSTALLED DURING FUTURE DRAWING NAME:
2,50 URE 10" SDR-35 ST
APPROXIMATE LOCATION OF FUTURE 8" SDR-35 VALVE AS SHOWN
ST
ST
PROPOSED PHASE OF CONSTRUCTION
N
ST
ST
IO
PVC @ 0.40% ST
PVC @ 0.40% (FOR FUTURE USE)
UT
0 G. Utility Plan
ST
SANITARY LATERAL FROM PROPOSED ST
8"x8"x6" TEE
CA
STOP ST APPROXIMATE LOCATION OF FUTURE PROPOSED YARD DRAIN YD
FUTSANITARY LATERAL FROM PROPOSED
ST
BAN S.F. BUILDING; TO BE INSTALLED DURING ST
FUTURE PHASE OF CONSTRUCTION ST URE TO BE INSTALLED DURING
RES BUILDING;
ST
ST
K
ST
ST
ST
ST
TAFUTUREDRIV OF CONSTRUCTION OFFSITE IMPROVEMENTS TO
ST U PHASE E RAN CONNECT TO EXISTING SAN PROPOSED MANHOLE MH
ST
T 2, -THRU
ST ST
ST
MANHOLE 12 AT INV. 607.43. WV
ST
ST
380
STOP
ST
ST
STOP REFER TO PLANS BY OTHERS.
ST ST
ST
SF PROPOSED HYDRANT ASSEMBLY
ST
ST
OR TO PLUG ST
STOP
Date: 07/20/26
ST
AST INVERT; ST
APPROXIMATE LOCATION OF FUTURE ST
PROPOSED GATE VALVE GV
ST
DEMOLITION PLAN PROPOSED 8" AWWA C-900
STOP
APPROXIMATE LOCATION OF FUTURE SANITARY LATERAL FROM PROPOSED
ST ST Drawn By: C. Wood
SANITARY LATERAL FROM PROPOSED BUILDING; TO BE INSTALLED DURING PVC COMBINED WATER Scale: As Noted
SAN MH 3 STOP STOP ST
SERVICE (5' MIN. COVER) NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A
ST
BUILDING; TO BE INSTALLED DURING FUTURE PHASE OF CONSTRUCTION
ST
IM 614.36 STOP ST 3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE DRAWING NO.
FUTURE PHASE OF CONSTRUCTION SAN MH 4 SAN MH 8
ST
COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE
ST
NV 601.31 RIM 612.66
UTILITY PLAN
ST
ST
RIM 613.96 BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK.
C-402
ST
NV 601.21 SE INV 601.94 FU MAINTAIN 18" VERTICAL CLEARING AT
ST
RES TURE D
STOP
ST SW INV 604.52
ST
ALL STORM/SANITARY CROSSINGS, TYP.
N INV 601.84
ST
TAU RIV NE INV 604.42
STOP
ST
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
ST
ST
ST
RAN E-TH SCALE: 1"=40' CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
ST 133 LF T, 2 RU
ST
,300 PROPOSED PIPE CROSSING:
ST
ST
10" SDR-35 Project No: 24-4113
ST
ST
ST
SF 8" SAN. INV= 604.55 40 0 40 80Ft.
ST
PVC @ 0.40% ST 24" STORM INV=609.25 209 LF 40'
PROPOSED PIPE CROSSING:
PROPOSED PIPE CROSSING: 8" SDR-35 Page 1065 of 1174
ST
10" SAN. INV=601.18 ST
ST
ST
Page 1066
PROPOSED 8" AWWA C-900
STOP
ST
CA
PVC COMBINED WATER %
.50
UT
@0
IO
SERVICE (5' MIN. COVER)
N
C
" PV
MAT F8
214
L
CHL
N
ST
IO
ST
UT
INE
CA
MAINTAIN 18" VERTICAL CLEARING AT MAT
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
(C-4
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
(SHEET C-402) ALL STORM/SANITARY CROSSINGS, TYP. CHL 02)
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
INE
ST
Greensboro
ST OP
)
(NE
(DESIGNED
(C-4 MAT 1 1 .87 SE)
01) CHL
=6 7 (
OUT 11.9
INV IN=6 83
ST
BY OTHERS) INE INV 619.
MAT TF= H-4
CA
(BY
UT
209 LF SM
CHL
IO
OTH
N
(SHEET C-401) PROPOSED PIPE CROSSING: 8" SDR-35 INE ERS
ST
(C-4
N
232 LF 8" SAN. INV= 605.10 PVC @ 0.85% )
TIO
ST
U
03)
CA
8" SDR-35 18" STORM INV=608.15
CURRENT SHEET
PVC @ 0.40%
Utica
ST
PROPOSED 6" GATE VALVE
SHEET LOCATION MAP RIMSAN613.17
PROP. 6" AWWA C-900 PVC MH 9
CA
COMBINED SERVICE (5' MIN. COVER) OFFSITE IMPROVEMENTS SHOWN DESIGNED BY
UT
Buffalo
IO
N
CA
OTHERS. REFER TO OFFSITE PLANS BY OTHERS
UT
SW INV 605.55
IO
PROPOSED
N
SCALE: N.T.S.
N
SE INV 605.55
IO
8"x8"x6" TEE
UT
ST
CA
N
NE INV 605.45
IO
UT
ST
CA
PROPOSED PIPE CROSSING:
ST
8" SAN. INV= 605.67
36" STORM INV=608.20
ST
ST
ST
ST
CA
UT
IO
N
ST
PROPOSED PIPE CROSSING:
ST
N
IO
ST
UT
8" SAN. INV= 606.18
CA
ST
18" STORM INV=608.30
PROPOSED STORMWATER 301 LF
8" SDR-35
ST SAN MH 10
RIM 613.26
ST SW INV 606.85
MANAGEMENT AREA PVC @ 0.40% STNE INV 606.75
ST
West Seneca Exchange
ST
ST
ST
FUT
Slade Ave, Ridge Rd & Orchard Park Rd
APPROXIMATE LOCATION OF
ST
FUTURE 6" COMBINED SERVICE 2 , 9 URE ST
PROPOSED PIPE CROSSING: 25 ST
RET G.S.F. STO
ST
8" SAN. INV= 607.02
189 LF P
ST
FUTURE FIRE
42" STORM INV=608.44
AIL 8" SDR-35 ST
HYDRANT APPROXIMATE LOCATION OF FUTURE WATER PVC @ 0.40% ST
ST
SERVICE TO PROPOSED BUILDING; TO BE INSTALLED ST
ST ST
DURING FUTURE PHASE OF CONSTRUCTION
ST ST ST ST ST
ST
ST ST
ST
ST
ST ST APPROXIMATE LOCATION OF FUTURE
PROPOSED CAP TO BE INSTALLED SANITARY LATERAL FROM PROPOSED
West Seneca New York
ST
ST
BUILDING; TO BE INSTALLED DURING SAN MH 11
STOP
STOP
ST ST
JUST AFTER 6" GATE VALVE AS ST
ST
ST ST
FUTURE PHASE OF CONSTRUCTION RIM 612.95
SHOWN (FOR FUTURE USE) ST
ST NE INV 607.61 ST
ST
ST
© CARMINA WOOD DESIGN
ST
STOP
ST ST
ST
OPOSED 6" AWWA C-900 PVC COMBINED ST ST
ST
ST ST
ATER SERVICE (5' MIN. COVER) FU
RES TURE D
ST ST
OPOSED 8"x8"x6" 3-WAY TEE
TAU RIV
STOP
ST
ST ST ST ST ST RAN E-TH MAT
T 2, RU CHL
ST ST ST
STOP
ST ST ST ST
380 MAT
ST
INE
ST ST ST ST ST
ST
APPROXIMATE LOCATION OF FUTURE WATER SERVICE TO PROPOSED SF CHLIN (BY
BUILDING; TO BE INSTALLED DURING FUTURE PHASE OF CONSTRUCTION E (C OTH
-403 ERS
)
ST
STOP ST )
ST
ED CAP TO BE INSTALLED JUST AFTER
ST
ST
VALVE AS SHOWN (FOR FUTURE USE)
ST
APPROXIMATE LOCATION OF
)
-401
FUTURE 6" COMBINED SERVICE
APPROX. LOCATION OF FUTURE
FUTURE RETAIL
Date
RESTAURANT SANITARY LATERAL FROM PROP. FUTURE RETAIL
E (C
BUILDING; TO BE INSTALLED
DURING FUTURE PHASE OF 100'x100' 100'x100'
HLIN
CONSTRUCTION
EX. OFFICE
ST
10,000 SF
C
10,000 SF
ST
MAT
03)
7,980 SF
(C-4
ST
APPROXIMATE LOCATION OF FUTURE WATER
ST
STOP SERVICE TO PROPOSED BUILDING; TO BE INSTALLED
DURING FUTURE PHASE OF CONSTRUCTION
INE
STOP
ST
No. Description
CHL
ST
MAT
ST
REVISIONS:
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
STOP
APPROXIMATE LOCATION OF FUTURE SANITARY LATERAL FROM PROPOSED
BUILDING; TO BE INSTALLED DURING FUTURE PHASE OF CONSTRUCTION
SLADE DRIVE IMPROVEMENTS SHOWN
DESIGNED BY OTHERS. REFER TO OFFSITE
PLANS BY OTHERS
PROPOSED 8"
G.V. (BY ECWA)
PROPOSED 24"x24"x8"
TAPPING SLEEVE &
VALVE (BY ECWA)
Sealed 07/20/2026
PROPOSED UTILITY LEGEND
PROPOSED STORM SEWER ST
PROPOSED SANITARY SEWER 6" SA
PROPOSED WATERLINE 1" W
PROPOSED CATCH BASIN CB DRAWING NAME:
PROPOSED YARD DRAIN YD Utility Plan
PROPOSED MANHOLE MH
PROPOSED HYDRANT ASSEMBLY
Date: 07/20/26
PROPOSED GATE VALVE GV Drawn By: C. Wood
Scale: As Noted
NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A
3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE DRAWING NO.
COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE
UTILITY PLAN BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK.
SCALE: 1"=40'
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
C-403
Project No: 24-4113
40 0 40 80Ft.
40'
Page 1066 of 1174
Page 1067
DETECTABLE TAPE
TRENCH WIDTH 1'-6" BELOW FINISHED GRADE
(I.D. + 24") 6" TOPSOIL (MIN.)
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
2
DETECTABLE TAPE
EXCAVATED FROM TRENCH
BACKFILL WITH MATERIAL
1'-6" BELOW FINISHED GRADE
TRENCH WIDTH
12" (I.D.) 12" (I.D. + 24")
2
Utica
12"
1
.
DIA
O.D.
Buffalo
12" (I.D.) 12"
)
D.
(I.
TOP OF PIPE ZONE
(6"MIN.)
1/3 I.D. (12"MAX.)
12"
1
.
DIA
O.D.
D.)
NOTES:
(I.
A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS. (6"MIN.)
1/3 I.D. (12"MAX.)
B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING.
C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL
PLACEMENT AND MAXIMUM PAY LIMITS.
D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL NOTES:
BE USED IN ALL UNSHEETED TRENCH AREAS. A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS.
MATERIALS B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING.
West Seneca Exchange
PIPE BEDDING MATERIAL (NYSDOT 1985 EDITION) C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL
PLACEMENT AND MAXIMUM PAY LIMITS.
1 NO. 1 CRUSHED STONE OR CRUSHED GRAVEL WITH A GRADATION CONFORMING WITH NYSDOT SECTION 703-02. THE MATERIAL
SHALL BE WELL GRADED WITH NO PARTICLES LARGER THAN ONE INCH AND HAVING A MAXIMUM GRADATION MEETING THE LIMITS D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL
DESCRIBED IN THE SPECIFICATIONS. THE BEDDING SHALL BE COMPACTED IN 6" LIFTS WITH EQUIPMENT ACCEPTABLE TO THE PIPE BE USED IN ALL UNSHEETED TRENCH AREAS.
Slade Ave, Ridge Rd & Orchard Park Rd
MANUFACTURER.
MATERIALS
NO SLAG SHALL BE ALLOWED FOR MATERIAL 1 PIPE BEDDING MATERIAL (NYSDOT 1985 EDITION)
2 TYPE 2 CRUSHED STONE OR CRUSHED GRAVEL WITH A GRADATION CONFORMING WITH NYSDOT SECTION 304-2.02 TYPE 2. THE 1 NO. 1 CRUSHED STONE OR CRUSHED GRAVEL WITH A GRADATION CONFORMING WITH NYSDOT SECTION 703-02. THE MATERIAL
MATERIAL SHALL BE WELL GRADED WITH NO PARTICLES LARGER THAN TWO INCHES AND HAVING A MAXIMUM GRADATION MEETING THESHALL BE WELL GRADED WITH NO PARTICLES LARGER THAN ONE INCH AND HAVING A MAXIMUM GRADATION MEETING THE LIMITS
LIMITS DESCRIBED IN THE SPECIFICATIONS. THE BEDDING SHALL BE COMPACTED IN 6" LIFTS WITH EQUIPMENT ACCEPTABLE TO THE PIPEDESCRIBED IN THE SPECIFICATIONS. THE BEDDING SHALL BE COMPACTED IN 6" LIFTS WITH EQUIPMENT ACCEPTABLE TO THE PIPE
MANUFACTURER. MANUFACTURER.
NO SLAG SHALL BE ALLOWED FOR MATERIAL 1
West Seneca New York
NO SLAG SHALL BE ALLOWED FOR MATERIAL 2
2 BACKFILL MATERIAL SHALL BE NATIVE SOIL CONTAINING NO UNSUITABLE MATERIAL COMPACTED IN 6" LIFTS.
© CARMINA WOOD DESIGN
SEWER/WATERLINE TRENCH SECTION
IN PAVED AREAS SEWER/WATERLINE TRENCH SECTION
NOT TO SCALE
IN UNPAVED AREAS 8"METER & RPZ INSULATED ENCLOSURE
NOT TO SCALE
'L' 'L'
UNDISTURBED OR
COMPACTED EARTH
FINAL GRADE VALVE BOX COVER
SHALL BE LABELED
Date
'WATER'
2'-6" MIN.
UNDISTURBED OR
COMPACTED EARTH COLOR
ELBOW FITTING, PUBLIC: YELLOW
TEE FITTING, TYP. PRIVATE: RED
TYP.
PLAN
PLAN THREE PIECE CAST IRON VALVE
CONCRETE THRUST BOX WITH COVER
BLOCK, TYP. CONCRETE THRUST
BLOCK, TYP. FINISH GRADE BREAKAWAY
NOTE
SEE
FLANGE, CLOSE
No. Description
WATER MAIN WATER MAIN TO FINISH
TYP. TYP. GRADE
'H'
'H'
REVISIONS:
THREE PIECE CAST IRON VALVE BOX
4'-6" MIN. COVER
ELEVATION ELEVATION
DEPTH VARIES
EXTENSION PIECES TO BE
FURNISHED IF REQUIRED
6" GATE VALVE,
HYDRANT SHUT-OFF 5-1/4" VALVE
DIMENSION SCHEDULE OPENING
PIPE 90° ELBOW 45° ELBOW 22.5° ELBOW 11.25° ELBOW VALVE
SIZE 'H' 'L' 'H' 'L' 'H' 'L' 'H' 'L'
4" 1.5' 2.0' 1.0' 2.0' 1.0' 1.0' 1.0' 1.0' WATER MAIN
6" 2.0' 2.5' 1.5' 2.0' 1.0' 1.5' 1.0' 1.5'
8" 2.5' 3.5' 2.0' 2.5' 1.5' 1.5' 1.0' 2.0'
10" 3.0' 4.5' 2.5' 3.0' 1.5' 3.0' 1.0' 2.5'
Sealed 07/20/2026
#4 STEEL REBAR ANCHOR ROD,
12" 3.5' 5.0' 3.0' 3.5' 2.5' 2.5' 1.5' 2.5' TYP. BEND AS REQ'D. CONCRETE ANCHOR BLOCK 2'-0" CONCRETE
WIDE BLOCKING, TYP.
DIMENSION SCHEDULE 1'-0" WATER MAIN
FOR CONNECTION
PIPE TEE OR TAP THRUST BLOCK SCHEDULE RESTRAIN JOINTS USING
SIZE SLEEVE RETAINER GLANDS (TYP.)
---- 'H' 'L'
4" 1.5' 1.0' DIMENSION TO BE DETERMINED
6" 1.5' 2.5' IN THE FIELD
1'-0" MIN. NOTE:
8" 1.5' 3.5' CENTERLINE OF THE LOWEST
NOZZLE TO FINISH GRADE SHALL MIN. OF 8 CU. FT. CRUSHED
10" 2.5' 3.5' STONE FOR HYDRANT DRAINAGE
BE A MIN. OF 15" & MAX.
12" 3.5' 3.5' OF 18"
TYPICAL GATE VALVE DETAIL
NOT TO SCALE
TYPICAL FIRE HYDRANT ASSEMBLY DETAIL DRAWING NAME:
NOT TO SCALE
Utility Details
Date: 07/20/26
Drawn By: C. Wood
Scale: As Noted
DRAWING NO.
C-404
Project No: 24-4113
Page 1067 of 1174
Page 1068
FRAME AND GRATE SHALL BE NEENAH EXTERIOR CLEANOUT @ GRADE CAP
FRAME AND GRATE SHALL BE NEENAH R-1792-FG OR R-1792-FL W/"STORM" CAST IN R-1792-FG OR R-1792-FL W/"STORM" CAST IN J.R. SMITH #4251-U W/ VANDAL-
COVER IF SOLID COVER IS SPECIFIED, HEAVY DUTY BICYCLE PROOF FRAME AND COVER IF SOLID COVER IS SPECIFIED, HEAVY PROOF SCREWS OR APPROVED EQUAL
GRATE TO BE USED IN PARKING LOT AREAS UNLESS OTHERWISE SPECIFIED DUTY BICYCLE PROOF FRAME AND GRATE TO
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
BE USED IN PARKING LOT AREAS UNLESS
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
24" DIA. TOP COURSE
Greensboro
OTHERWISE SPECIFIED EXPANSION JOINT
8" STAND. 24" DIA. BINDER
2"
STANDARD WITH FIBERBOARD
12" MIN.
GRADE
STONE BASE 4000 PSI CONCRETE ENCASE
RISER RINGS W/GASKET TO FULL DEPTH OF FRAME
AS REQUIRED RISER RINGS W/GASKET
AS REQUIRED
6" FOR IN-LINE CLEAN-OUT
Utica
TOP SLAB IS
8"
SEE PLANS
SELECT FILL 8" FOR END OF LINE LAMPHOLE
TYP.
VARIES
STEEL REINFORCED TO MEET
12"
OR EXCEED HS-20 LOADING.
ECCENTRIC CONE
(IF SPECIFIED)
48" DIA. MIN.
SECTION
OR AS REQ'D
Buffalo
DET. A
NOTE: ECCENTRIC CONE SECTION SHALL BE USED UNLESS ALTERNATE TOP SLAB FLOW
DEPTH WARRANTS TOP SLAB PER MANUFACTURER
SEE PLANS FOR
SEWER SIZES
FRAME OD + 2'
GASKETED STEEL REINFORCED COPOLYMER
JOINT (TYP.) POLYPROPYLENE PLASTIC STEP
RISER SECTION
LAMPHOLE/CLEANOUT IN PAVEMENT/SIDEWALK
(IF REQ'D)
NOT TO SCALE
48" DIA. MIN. 5" MIN. OR
OR AS REQ'D AS REQ'D
DETAIL A
West Seneca Exchange
NOTE: MANHOLE TO BE COATED ON OUTSIDE WITH EXTERIOR CLEANOUT @ GRADE
BITUMASTIC SEALER J.R. SMITH #4251-U W/ VANDAL-
PROOF SCREWS OR APPROVED EQUAL
PVC CAP END NOTE: COVER TO BE
Slade Ave, Ridge Rd & Orchard Park Rd
GENERAL NOTES: INSCRIBED "SANITARY"
2"x4" MARKER TO BE CUT 1'-0" BELOW
1. REINFORCED STEEL TO CONFORM TO LATEST A.S.T.M. A185 GRADE AFTER FINAL FIELD WALK (END
SPEC. 0.12 SQ. IN./LINEAL FT. AND 0.12 SQ. IN. (BOTH WAYS) OF LINE CLEANOUTS ONLY)
PIPE, SEE PLAN IN BASE SLAB.
FOR SIZE & INVERT
2"
2. CONCRETE COMPRESSIVE STRENGTH - 4000 PSI MINIMUM.
BASE SECTION
FRAME OD+2'
12"
3. MANHOLE DESIGN SPECIFICATIONS TO CONFORM TO LATEST
12" MIN.
A.S.T.M. C478 SPEC. FOR PRE-CAST REINFORCED CON-CRETE
MANHOLE SECTIONS.
SEE PLANS
4000 PSI CONCRETE
VARIES
4. SINGLE POUR MONOLITHIC BASE SECTION. ENCASEMENT
West Seneca New York
24" MIN.
8" THK.
SEE PLANS
© CARMINA WOOD DESIGN
VARIES
6"x6"x6" WYE
6" MIN.
PER TRENCH DETAIL
#1STONE BEDDING
(VARIES W/SIZE OF PIPE)
12"
COMPACTED TYPE 2 R.O.C. STONE BASE,
NYSDOT ITEM 304.02
TYPICAL SANITARY MANHOLE DETAIL
NOT TO SCALE
WATER TIGHT
PVC END CAP 6" Ø PVC OR A SPECIFIED ON PLANS
Date
(END OF LINE CLEANOUTS ONLY)
LAMPHOLE/CLEANOUT IN LAWN/FIELD AREAS
NOT TO SCALE
No. Description
REVISIONS:
Sealed 07/20/2026
DRAWING NAME:
Sanitary Sewer
Details
Date: 07/20/26
Drawn By: C. Wood
Scale: As Noted
DRAWING NO.
C-405
Project No: 24-4113
Page 1068 of 1174
Page 1069
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
(SHEET L-102)
Greensboro
(DESIGNED
BY OTHERS)
RS)
THE
(SHEET L-101)
YO
(PLA )
NS B
02
(L-1
(SHEET L-103)
Utica
LINE
LINE
SHEET LOCATION MAP
CH
CH
MAT
Buffalo
MAT
SCALE: N.T.S.
ST
OP
OP
ST
FUT
URE
1
80,3 -STOR
OP 00 S Y RE
62
0
ST
.F. TAIL
620 WV
620
DN
NOTE:
FUTURE DEVELOPMENT AREAS SHOWN DN
ON THIS PLAN SET ARE CONSIDERED
West Seneca Exchange
0
62
TO BE CONCEPTUAL ONLY.
620
620
WV
Slade Ave, Ridge Rd & Orchard Park Rd
0
ST
62
ST WHO PROPO
LE SED
158 SALE R
STOP
ST ,000 ETA 620
S TOP SF IL
ST
620
ST
MATCH LINE (L-102)
ST
ST NOTE:
IO
MATCH LINE (L-101) OFFSITE IMPROVEMENTS SHOWN DESIGNED BY
PAT
West Seneca New York
FUT
UR OTHERS. REFER TO OFFSITE PLANS BY OTHERS
130 E RETA
ST
ST
ST
TOP S
9,10 'x70' IL
STOP
FU 0 SF
RES TURE D
STOP
TAU RIVE
© CARMINA WOOD DESIGN
N
RAN -TH ST WV
IO
UT
620
CA
ST
IO
T 4, RU
620
ST
CA
PAT
963
UT
IO
SF
N
STOP
N
IO
UT
CA
STOP CA
UT
IO
N
STOP ST
STOP 620
S TOP ST
ST
ST
ST
CA
ST
UT
FU ST ST
IO
N
620
2,50 TURE
ST
N
IO
UT
0
CA
ST
BAN G.S.F.
STOP FU
ST
620
ST WV
ST
K RES TURE D N
IO
UT
TAU RIV
CA
ST
ST RAN E-TH 620
T 2, RU
62
WV 620
ST
0
E TANK_1011
380
STOP
SP_FF_ADDITIV
STOP SF
WV
ST ST CA
UT
IO
N
STOP
620
STOP
ST
ST
CA
620
UT
STOP
IO
STOP ST
N
620
STOP
N
IO
UT
ST
CA
PLAN CIVIL
ARCH D BY
LY ON
-
DETERMINE
ACCORDINGBE
TO PLACED
LOCATED
LOCATION
AND IS RANDOMLY
CORRECT
EQUIPMENT
FU
REST TURE D
620
STOP
ST
NT
CONTAINME
0317
ST
ST
40K_US_
SPILL
ANK_
AUR RIVE STOP
CABINET DRUM
SP_FF_T
ROLL-TOP
0317
40K_US_
ANT -THR
ANK_
SP_FF_T
ST , 2,3 U
0317
40K_US_
ANK_
SP_FF_T
00 S
CA
F
UT
IO
620
N
ST
ST
N
ST
IO
0
62
STOP
UT
ST
CA
ST
STOP
STOP
62
STOP ST
0
STOP
615
ST
Date
621
ST
ST
0
62
CA
ST
UT
IO
620
N
CA
UT
IO
N
ST 615
N
IO
UT
CA
N
STOP
IO
620
UT
CA
ST
STOP
STOP STOP
ST
ST
0
ST
62
ST
ST
CA
UT
0
62
IO
N
STOP
STOP
ST
620
ST
N
IO
ST
UT
CA
PROPOSED STORMWATER
620
ST
ST
ST
625
ST
ST
ST MANAGEMENT AREA
ST
ST ST 625
62
5
ST
ONLY ST FU
ST
No. Description
ONLY
STOP STOP STOP STOP 2,92 TURE
STOP 5
RET G.S.F.
STOP STOP STOP STOP
ST 5
62
STOP
AIL
REVISIONS:
625
ST
62
STOP
0
ST
ST
ST ST ST
STOP
ST
STOP ST ST
STOP
STOP
STOP
ST
ST ST
STOP
ST
ST
ST
ST
FU ST
RES TURE D
ST TAU RIV
STOP
ST
FUTURE RETAIL FUTURE RETAIL FUTURE RETAIL
ST ST ST ST RAN E-TH
T 2, RU
MAT
STOP
ST ST
110'x200' FUTURE RETAIL 380
SF
CH
110'x200' 110'x200' 110'x200' LINE
ST
22,000 SF MAT
ST
22,000 SF 22,000 SF NOTE: STOP
(PLA
22,000 SF ST CH
ST
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN LINE NS B
NOTE: FUTURE SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. (L-1 YO
RESTAURANT FUTURE RETAIL FUTURE RETAIL 03) THE
ST FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN
100'x100' 100'x100' 100'x100'
RS)
ST
SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. 10,000 SF EX. OFFICE
ST 10,000 SF 10,000 SF 7,980 SF
ST
ST
ST
ST ST ST ST STOP
ST ST ST ST STOP
Sealed 07/20/2026
ST ST ST ST ST ST ST
ST
STOP
(L-1 )
01
03)
(L-1
LINE
LINE
CH
CH
MAT
MAT
OVERALL LANDSCAPE PLAN DRAWING NAME:
Landscape Plan
LEGEND
SCALE: 1"=100'
Overall
DECIDUOUS TREE
SMALL TREE
Date: 07/20/26
EVERGREEN TREE/SHRUB
Drawn By: C. Wood
Scale: As Noted
BUSH/ORNAMENTAL GRASS DRAWING NO.
PERENNIAL
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,L-100
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
100 0 100 200Ft. Project No: 24-4113
100'
Page 1069 of 1174
Page 1070
ST
ST
MATCHLINE (L-102) ST
ST
MATCHLINE (L-101)
IO
ST
ST
PAT
FUT
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
ST
URE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
(SHEET L-102) ST
Greensboro
1-GTd
ST
(DESIGNED
OP STST
130 RETA
ST
ST
9,10 'x70' IL
STOP
BY OTHERS)
ST
YOU ARE FU ST
0 SF
RES TURE D
ST
ST
STOP
HERE TAU RIVE ST
RAN -TH ST
IO
T 4, RU
ST
ST
1-GTd
ST
PAT
(SHEET L-103) 963 ST ST
SF
Utica
STOP
ST
ST
STOP
SHEET LOCATION MAP 3-QRxB STOP ST
ST
ST
STOP
ST
S ST
Buffalo
TOP ST
ST
ST
ST
SCALE: N.T.S. ST
ST
ST
ST
ST
ST
ST
ST ST
GV
ST
5-QRn
FU
ST
1-GTd ST
ST
2,50 TURE
ST
3-QRxB ST
ST
ST
ST
ST ST
0 G.
ST
ST
STOP ST
FU
ST
BAN S.F.
ST
ST
RES TURE D
ST
ST
K
ST
ST
ST
ST
TAU RIV
ST
RAN E-TH
ST
ST ST
ST
T 2, RU
ST
ST
380
STOP
ST
ST
1-GTd ST STOP SF
ST ST
ST
1-GTd ST
ST
3-QRn
STOP
ST
ST
2-QRxB ST
ST
STOP
ST ST
3-AxB
STOP 1-UAp STOP ST
ST
ST
STOP ST
West Seneca Exchange
ST
ST
3-ArRS ST
ST
1-GTd
ST
FU
ST
RES TURE D
STOP
ST ST
ST
ST 3-GTd TAU RIV STOP
ST
ST
RAN E-TH
Slade Ave, Ridge Rd & Orchard Park Rd
ST
ST
T, 2 RU 1-GTd
ST
,300
ST
616
ST
ST
ST
1-QRxB
ST
SF
ST
5-QRn ST
2-GTd
ST
ST
ST
5-GBps 1-ArRS
ST
ST
STOP
ST
ST ST
ST
ST
ST
ST
STOP
ST
ST
STOP STOP
ST
ST
STOP
ST 1-GTd ST
ST
ST
ST
ST
ST ST ST
1-UAp
West Seneca New York
ST
ST
ST
1-UAp 2-QRxB ST
ST
616
ST ST
© CARMINA WOOD DESIGN
STOP
ST
ST ST
ST
ST
ST
ST
1-GTd
ST
STOP
ST
STOP ST
STOP
ST
ST
ST
5-ArRS
ST
ST
ST ST
ST
ST
ST
ST
ST
ST
ST
STOP
STOP
ST
ST
ST
ST
ST
ST
ST
ST PROPOSED STORMWATER
ST
ST
ST
MANAGEMENT AREA
ST
ST
ST ST
ST
ST
ST
ST
Date
ST
ST ST
ST
ST
ST
ST
ST ST
ST
ST
STOP STOP ST
STOP STOP STOP STOP
ST
STOP STOP
ST
ST
STOP
AQUATIC BENCH AREA AND SHALLOW
No. Description
ST
BASIN AREA TO BE SEEDED WITH
ST
STOP
ERNST MIX ERNMX NO. 127
REVISIONS:
ST ST
(REF. L-103 FOR MIX SPECIFICATIONS)
STOP
ST ST ST ST ST ST
ST
ST
ST
ST
STOP
ST
ST
STOP ST
STOP
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
01)
ST
ST
ST
(L-1
03)
ST
(L-1
STOP
FUTURE RETAIL
INE
ST ST ST ST
ST
FUTURE RETAIL
ST ST ST ST ST LEGEND
FUTURE RETAIL
ST ST
STOP
ST ST
CHL
ST
FUTURE RETAIL
ST ST
INE
ST ST
ST
ST ST ST
110'x200'
Sealed 07/20/2026
110'x200' DECIDUOUS TREE
CHL
MAT
110'x200' 110'x200'
22,000 SF
ST
MAT
ST
22,000 SF 22,000 SF 22,000 SF
SMALL TREE
ST
ST
EVERGREEN TREE/SHRUB
FUTURE
ST
ST
ST
ST
RESTAURANT FUTURE RETAIL BUSH/ORNAMENTAL GRASS
FUTURE RETAIL
PERENNIAL
100'x100'
ST
ST
ST ST 100'x100' 100'x100'
ST
10,000 SF 10,000 SF
ST
10,000 SF
ST
ST
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS, DRAWING NAME:
ST
ST
ST CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
ST
ST
ST ST ST ST ST ST ST
STOP
STOP 40 0 40 80Ft. Landscape Plan
ST
ST ST ST
ST
ST
40'
ST ST ST ST ST ST ST
ST
ST ST
ST ST ST
ST ST ST ST ST ST ST
ST
ST ST
ST
ST ST ST ST ST
14-JS
ST ST ST ST ST
ST KEY QTY. BOTANICAL NAME COMMON NAME MIN. SIZE REMARKS
ST ST
GTd 29 Gleditsia triacanthos I "Draves" Street Keeper Honey Locust 2 1/2" - 3" CAL. B&B, HT. 40', W 35'
QRxB 16 Quercus robur x bicolor 'Long' Regal Prince Oak 2 1/2" - 3" CAL. B&B, HT. 35', W 18' Date: 07/20/26
GV
UAp 3 Ulmus americana 'Princeton' Princeton American Elm Tree 2 1/2" - 3" CAL. B&B, HT. 60', W 40' Drawn By: C. Wood
QM 3 Quercus macrocarpa Chestnut Oak 2 1/2" - 3" CAL. B&B, HT.50', W 30' Scale: As Noted
CBL 8 Carpinus betulus 'Lucas' Lucus columnar hornbeam 2 1/2" - 3" CAL. B&B, HT.30' W 10'
QRn 13 Quercus robur x bicolor 'Nadler' Kindred Spirit Oak 2 1/2" - 3" CAL. B&B, HT.30' W 6'
DRAWING NO.
ArRS 9 Acer rubrum 'Red Sentinel' Red Sentinel Maple 2 1/2" - 3" CAL. B&B, HT.30' W 12'
GBps
AxB
SR
5
3
3
Ginkgo biloba 'Princeton Sentry'
Aesculus x bushii 'Aaron 1'
Syringa reticulata 'Ivory Silk'
Maiden Hair Tree
Mystic Ruby Buckeye
Ivory Silk Tree Lilac
2 1/2" - 3" CAL.
2 1/2" - 3" CAL.
1 1/2" - 2 1/2"" CAL.
B&B, HT.50' W 20'
B&B, HT.30' W 15'
B&B, HT.20' W 15' L-101
LANDSCAPE PLAN JS 14 Juniperus scopolarum 'Skyrocket' Skyrocket Juniper 6-8' Tall B&B, HT. 16', W 4'
Project No: 24-4113
SCALE: 1"=40' Page 1070 of 1174
Page 1071
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
YOU ARE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
HERE
(DESIGNED
BY OTHERS)
(SHEET L-101)
(SHEET L-103)
Utica
SHEET LOCATION MAP
Buffalo
S T
SCALE: N.T.S.
OP
OP
ST
West Seneca Exchange
FUT
URE
Slade Ave, Ridge Rd & Orchard Park Rd
1
80,3 -STOR
00 S Y RE
P O
ST
.F. TAIL DN
5-GTd
West Seneca New York
2-GTd
© CARMINA WOOD DESIGN
2-GTd
WV
2-GTd
3-QM
Date
ST
ST
ST
1-QRxB
ST
ST
RS)
2-QRxB
W
-B
E
W
76
OTH
-B
-BW
76
ST
ST
-BW
76
5-CBL 1-GTd
STOP
No. Description
S BY
ST
2-QRxB
76
02)
STOP ST
(L-1
LAN
REVISIONS:
ST
ST
E (P
INE
ST
ST
CHL
HLIN
3-CBL
MAT
ST
C
ST
MAT
MATCHLINE (L-102)
ST
ST
MATCHLINE (L-101)
IO
ST
ST
PAT
FUT
ST
ST
1-GTd URE
ST
STOP ST
130 RETA LEGEND
ST
ST
9,10 'x70' IL
STOP
Sealed 07/20/2026
ST
FU 0 SF
DECIDUOUS TREE
RESTTURE D
ST
ST
ST
STOP
AUR RIVE- ST
ST
WV
ANT THR SMALL TREE
IO
ST
ST
4,96 U 1-GTd
ST
CA
PAT
UT
3 SF
IO
ST ST
N
STOP
EVERGREEN TREE/SHRUB
N
IO
ST
UT
ST
CA
3-QRxB STOP
STOP ST BUSH/ORNAMENTAL GRASS
ST
ST
STOP
ST
STOP ST ST
ST
PERENNIAL
ST
ST ST
ST
ST ST
ST
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
ST
ST
ST
CA
ST
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
UT
ST
5-QRn
FUT
IO
ST
N
1-GTd ST
ST
ST DRAWING NAME:
2,50 URE 3-QRxB ST
40 0 40 80Ft.
ST
ST
N
ST
ST
IO
ST
UT
0 G. Landscape Plan
ST
ST 40'
CA
ST
STOP FUT
ST
BAN S.F.
ST
ST
RES URE D
ST
ST
K
ST
ST
ST
ST
TAU RIV
ST
RAN E-TH
ST
ST ST KEY QTY. BOTANICAL NAME COMMON NAME MIN. SIZE REMARKS
ST
T 2, RU WV
ST
011
TANK_1
ST
380
LANDSCAPE PLAN
VE
STOP
ADDITI
SP_FF_
ST
ST
1-GTd ST STOP SF GTd 29 Gleditsia triacanthos I "Draves" Street Keeper Honey Locust 2 1/2" - 3" CAL. B&B, HT. 40', W 35'
ST ST
ST
1-GTd ST QRxB 16 Quercus robur x bicolor 'Long' Regal Prince Oak 2 1/2" - 3" CAL. B&B, HT. 35', W 18'
ST Ulmus americana 'Princeton' Princeton American Elm Tree B&B, HT. 60', W 40'
3-QRn UAp 3 2 1/2" - 3" CAL.
STOP
Date: 07/20/26
ST
ST
2-QRxB SCALE: 1"=40' ST QM 3 Quercus macrocarpa Chestnut Oak 2 1/2" - 3" CAL. B&B, HT.50', W 30'
ST
STOP
ST ST Drawn By: C. Wood
3-AxB CBL 8 Carpinus betulus 'Lucas' Lucus columnar hornbeam 2 1/2" - 3" CAL. B&B, HT.30' W 10'
STOP ST Kindred Spirit Oak
Scale: As Noted
STOP 1-UAp QRn 13 Quercus robur x bicolor 'Nadler' 2 1/2" - 3" CAL. B&B, HT.30' W 6'
ST
ST
S TO P ST ArRS 9 Acer rubrum 'Red Sentinel' Red Sentinel Maple 2 1/2" - 3" CAL. B&B, HT.30' W 12' DRAWING NO.
ST
ST
GBps 5 Ginkgo biloba 'Princeton Sentry' Maiden Hair Tree 2 1/2" - 3" CAL. B&B, HT.50' W 20'
3-ArRS ST PLAN CIVIL
ST
ARCHED BY
ON
GLY RMIN
RDIN BE DETE ED -
1-GTd
ACCO TO PLAC
TED TION OMLY
LOCA LOCA
L-102
AND ECT T IS RAND
CORR PMEN
ST
EQUI
FU AxB 3 Aesculus x bushii 'Aaron 1' Mystic Ruby Buckeye 2 1/2" - 3" CAL. B&B, HT.30' W 15'
ST
RES TURE D
STOP
ST
ST SR 3 Syringa reticulata 'Ivory Silk' Ivory Silk Tree Lilac 1 1/2" - 2 1/2"" CAL. B&B, HT.20' W 15'
ST
T
MEN
17
TAIN
_03
_US
CON
TAU RIV
K_ 40K
3-GTd
SPILL
TAN
FF_
STOP
ST
INET DRUM
SP_
CAB -TOP
ROLL
ST
ST
RAN E-TH
17
_03
_US
K_ 40K
TAN
ST SP_
FF_
T, 2 RU 1-GTd
17
_03
_US
K_ 40K
ST
ST
TAN
FF_
SP_
,300
ST
ST JS 14 Juniperus scopolarum 'Skyrocket' Skyrocket Juniper 6-8' Tall B&B, HT. 16', W 4' Project No: 24-4113
ST
ST
ST
SF
ST
5-QRn ST
2-GTd Page 1071 of 1174
ST
ST
ST 1-ArRS
ST
Page 1072
STOP
ST
3-AxB
CA
UT
IO
N
MAT
CHL
N
ST
IO
ST
UT
INE
CA
PLAN CIVIL
ARCH ED BY
ON
GLY RMIN
RDIN DETE ED -
ACCO TO BE PLAC
MAT
TED TION OMLY
LOCA LOCA
AND RECT T IS RAND
COR PMEN
EQUI
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
(L-1
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
(SHEET L-102) CHL 02)
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
IN E
ST
T
MEN
Greensboro
17
TAIN
_03
_US
CON
K_ 40K
SPILL
TAN
FF_
STOP
NET DRUM
SP_
CABI -TOP
(L-1
ROLL
17
_03
_US
K_ 40K
MAT
TAN
FF_
SP_
(DESIGNED 1-GTd 01) CHL
17
_03
_US
K_ 40K
TAN
FF_
SP_
ST
BY OTHERS) INE
MAT
CA
(BY
UT
CHL
IO
OTH
N
(SHEET L-101) INE ERS
ST
1-ArRS
5-GBps (L-1
N
)
TIO
03)
ST
U
CA
YOU ARE HERE
Utica
ST
SHEET LOCATION MAP
CA
UT
Buffalo
IO
N
CA
UT
IO
N
SCALE: N.T.S.
N
IO
UT
ST
CA
N
IO
UT
ST
CA
1-GTd
ST
ST
5-ArRS ST
ST
ST
CA
UT
IO
N
ST
ST
N
IO
ST
UT
CA
ST
PROPOSED STORMWATER ST
ST 1-GTd
MANAGEMENT AREA ST
ST
West Seneca Exchange
ST
ST
ST
FUT
Slade Ave, Ridge Rd & Orchard Park Rd
ST
2,92 URE1-GTd
ST
5 G. ST
RET S.F. STOP
ST
ST
AQUATIC BENCH AREA AND SHALLOW
AIL ST
5-SR
ST
BASIN AREA TO BE SEEDED WITH ST
ERNST MIX ERNMX NO. 127 ST 1-GTd
ST ST ST ST (REF. L-103 FOR MIX SPECIFICATIONS) ST ST
ST
ST
ST ST
ST
ST ST
ST
West Seneca New York
ST
ST
STOP
STOP
ST ST
ST
ST
ST ST
ST
ST ST ST
ST
© CARMINA WOOD DESIGN
ST
STOP
ST ST
ST
ST ST
ST
ST ST
FU
RES TURE D
ST ST
TAU RIV
STOP
ST
ST ST ST ST ST RAN E-TH MAT
T 2, RU CHL
ST ST ST
STOP
ST ST ST ST
380 MAT
ST
INE
ST ST ST ST ST
ST
SF CHL (BY
INE OTH
(L-1 ERS
03) )
ST
STOP ST
ST
ST
ST
ST
01)
FUTURE RETAIL
03)
Date
FUTURE RETAIL
(L-1
RESTAURANT
(L-1
100'x100'
INE
100'x100'
INE
EX. OFFICE LEGEND
CHL
ST
10,000 SF
CHL
10,000 SF
ST
MAT
7,980 SF DECIDUOUS TREE
MAT
ST
ST
STOP
STOP
SMALL TREE
ST
No. Description
ST
ST
REVISIONS:
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
STOP
EVERGREEN TREE/SHRUB
BUSH/ORNAMENTAL GRASS
PERENNIAL
Sealed 07/20/2026
KEY QTY. BOTANICAL NAME COMMON NAME MIN. SIZE REMARKS
GTd 29 Gleditsia triacanthos I "Draves" Street Keeper Honey Locust 2 1/2" - 3" CAL. B&B, HT. 40', W 35'
LANDSCAPE PLAN
Regal Prince Oak SCALE: 1"=40' DRAWING NAME:
QRxB 16 Quercus robur x bicolor 'Long' 2 1/2" - 3" CAL. B&B, HT. 35', W 18'
UAp 3 Ulmus americana 'Princeton' Princeton American Elm Tree 2 1/2" - 3" CAL. B&B, HT. 60', W 40' Landscape Plan
QM 3 Quercus macrocarpa Chestnut Oak 2 1/2" - 3" CAL. B&B, HT.50', W 30'
CBL 8 Carpinus betulus 'Lucas' Lucus columnar hornbeam 2 1/2" - 3" CAL. B&B, HT.30' W 10'
QRn 13 Quercus robur x bicolor 'Nadler' Kindred Spirit Oak 2 1/2" - 3" CAL. B&B, HT.30' W 6'
ArRS 9 Acer rubrum 'Red Sentinel' Red Sentinel Maple 2 1/2" - 3" CAL. B&B, HT.30' W 12'
GBps 5 Ginkgo biloba 'Princeton Sentry' Maiden Hair Tree 2 1/2" - 3" CAL. B&B, HT.50' W 20' Date: 07/20/26
Drawn By: C. Wood
AxB 3 Aesculus x bushii 'Aaron 1' Mystic Ruby Buckeye 2 1/2" - 3" CAL. B&B, HT.30' W 15'
Scale: As Noted
SR 3 Syringa reticulata 'Ivory Silk' Ivory Silk Tree Lilac 1 1/2" - 2 1/2"" CAL. B&B, HT.20' W 15'
DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
JS 14 Juniperus scopolarum 'Skyrocket' Skyrocket Juniper 6-8' Tall B&B, HT. 16', W 4'
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
40'
40 0 40 80Ft. L-103
Project No: 24-4113
Page 1072 of 1174
Page 1073
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
PRUNE AS SPECIFIED AND DETAILED
Greensboro
PRUNE ONLY DAMAGED OR BROKEN
BRANCHES
DRIVE STAKES INTO SUBGR. AS
SHOWN. 3/TREE OVER 5' HT. AND
2/TREE 5' HT. AND UNDER.
Utica
DRIVE STAKES INTO SUBGR. AS SHOWN.
3/TREE OVER 2'' CALIPER AND 2/TREE HOSE AND DOUBLE STRAND WIRE
Buffalo
2''CALIPER AND UNDER. GUYS. SET GUYS 1/2 TO 2/3 UP TREE.
INSIDE CONTINUOUS FINISH GRADE. PITCH AWAY FROM
PLANT BED SAUCER AT STRUCTURE.
HOSE AND DOUBLE STRAND WIRE GUYS CONDITION EDGE IN
OF BUILDING, WALL, FENCE
WHERE APPLICABLE - FACE
INSIDE PLANT CONTINUOUS LAWN
BED CONDITION SAUCER AT EDGE SET ROOT FLARE AT FINISH GRADE KEEP CONDITION
PRUNE ONLY BROKEN OR DAMAGED
IN LAWN MULCH 2" FROM TRUNK BRANCHES
CONDITION
OR STRUCTURE.
CONTINUOUS SETTLED DEPTH MULCH
FINISH GRADE AT SAUCER FINISH GRADE AT SAUCER BED - 4" DEPTH
2"
2"
TOPSOIL 45^ SPADE CUT EDGE WHERE BED
ROOT BALL MAX.
ABUTS LAWN UNLESS OTHERWISE
DEPTH OF 4"
MULCH 2" - 4" DEPTH
TOPSOIL NOTED OR SPECIFIED.
CUT AND LAYBACK TOP 1/3 BURLAP
4"
FROM ROOTBALL MULCH
West Seneca Exchange
PLANTING SOIL MIXTURE CUT AND LAY BACK TOP 1/3 BURLAP CUT AND LAY BACK TOP 1/3 BURLAP
FROM ROOT BALL FROM ROOT-BALL
Slade Ave, Ridge Rd & Orchard Park Rd
6"
ROOT BALL TO REST ON UNDISTURBED PLANTING SOIL MIXTURE
PLANTING SOIL MIXTURE
6"
1'-6"
SUBGRADE OR COMPACTED MOUND
UNDISTURBED SUBGRADE
1'-6"
LIGHTLY HAND TAMP SUBGRADE
2-0"
SEE DRWGS. SEE DRWGS.
West Seneca New York
2'-0" MIN. 2'-0" MIN.
3 x WIDER THAN ROOT BALL MIN.
6"
© CARMINA WOOD DESIGN
STD. DECIDUOUS TREET PLANTING STD. EVERGREEN PLANTING STD. SHRUB PLANTING
LANDSCAPE NOTES:
Date
''X''
1. ALL PLANTS INSTALLED SHALL MEET OR EXCEED THE MINIMUM REQUIREMENTS AS NOTED ON THE PLANS AND IN THE LATEST EDITION ON
THE AMERICAN STANDARD FOR NURSERY STOCK, BY THE AMERICAN ASSOCIATION OF NURSERYMEN, ANSI 260.1
PRUNE AS SPECIFIED AND AS DETAILED
''X'
TYPICAL SPACING ''X'' NOTED ON 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN QUANTITY TAKEOFF, THE QUANTITIES SHOWN ARE A MINIMUM AND ARE FOR
'
''X'
'
REFERENCE ONLY.
DRAWINGS AS ON-CENTER
DIMENSION. 3. THE CONTRACTOR SHALL PERFORM A ROUGH FIELD STAKEOUT OF ALL PLANTING MATERIAL LOCATIONS AND CONTACT THE OWNERS FIELD
REPRESENTATIVE PRIOR TO ACTUALL INSTALLING. THE PLANTING MATERIAL LOCATIONS SHOWN ON THE PLANS ARE TO CONVEY THE
DESIGN INTENT ONLY, ACTUAL LOCATIONS WILL BE FINALIZED BY THE OWNERS FIELD REPRESENTATIVE AT THE TIME OF INSTALLATION.
No. Description
4. THE CONTRACTOR IS HEREBY NOTIFIED THAT IF UNDERGROUND UTILITIES EXIST IN THE VICINITY OF THE PLANTINGS, ALL PROPOSED
RUBBER HOSE ON EACH MAJOR STEM. PLANTINGS SHALL BE INSTALLED A MINIMUM OF 5' FROM ANY UNDERGROUND UTILITY, CONTACT THE OWNERS FIELD REPRESENTATIVE IF
REVISIONS:
ALL MAJOR STEMS SHOULD BE WIRED PLANTINGS SHOWN ON THE PLANS VIOLATE THIS SITUATION.
SPACING VARIES. SEE PLANT LIST. TOGETHER. 5. ALL TREES SHALL BE INSTALLED A MINIMUM OF 20' FROM ANY OVERHEAD ELECTRIC LINES.
PLAN DOUBLE STRAND GUY WIRES (3). 4''W TREE WRAP TO FIRST LIMB 6. 1 PART
PLANTING BACKFILL MIXTURE SHALL CONSIST OF 4 PARTS TOPSOIL, 1 PART PEAT
3 MOSS,
WELL ROTTED MANURE, 10 LBS 5-10-5
PLANTING FERTILIZER THOROUGHLY MIXED PER CUBIC YARD.
WHITE FLAG ON EACH TO INCREASE
VISIBILITY. SET TREE AT ORIGINAL GRADE 7. STAKE AND WRAP TREES IMMEDIATELY FOLLOWING INSTALLATION.
"X" "X" INSIDE PLANT CONTINUOUS 8. ALL PLANTED AREAS SHALL RECEIVE A 3" LAYER OF SHREDDED PINE BARK MULCH OVER 10 MIL. WEED MAT EQUAL TO "WEEDBLOCK" BY EASY
BED CONDITION SAUCER AT EDGE GARDENER OR DEWITT WEED BARRIER.
PLACE THE CROWN OF THE PLANT IN LAWN EXPOSED ROOT FLARE KEEP MULCH 2"
9. THE AREAS ON THE PLAN TO BE SEEDED SHALL HAVE 4" MINIMUM OF TOPSOIL, DISK PLOWED, LEVELED AND HAND RAKED SMOOTH.
LEVEL WITH FINISH GRADE OF CONDITION FROM TRUNK SURFACE SHALL BE ROLLED TO REMOVE LUMPS.
PLANTING SOIL. MULCH 2"-4"
DEPTH FINISH GRADE AT SAUCER 10. ALL SEEDED AREAS SHALL BE HYDROSEEDED IN ACCORDANCE WITH THE SPECIFICATION INDICATED. WHERE REQUIRED BY CLIMATIC
Sealed 07/20/2026
CONDITIONS, SLOPE OR SEASON OF PLANTING, SOD MAY BE SUBSTITUTED FOR SEEDING IN ORDER TO ACHIEVE THE REQUIRED COVERAGE.
4" SETTLED DEPTH MULCH. TYPE AS TOPSOIL
DEPTH OF 4" 2"
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING, MOWING AND OTHER MAINTENANCE TO SEEDED AREAS UNTIL THE PROJECT IS
SPECIFIED. 2'-0'' MIN. LENGTH WOOD STAKES (3).
ROOT BALL MAX.
ACCEPTED BY THE OWNER, THIS SHALL INCLUDE WATERING DAILY FOR 15 DAYS OR AS REQUIRED BY WEATHER CONDITIONS AND
4"
GENTLY LOOSEN ROOT BALL PRIOR TO DRIVE INTO SUBGRADE AS SHOWN. RE-SEEDING OF THIN SPOTS FOLLOWING THE GERMINATION OF THE SEEDS.
PLANTING. IF CIRCLING ROOTS ARE
PRESENT CUT WITH A CLEAN SHARP CUT & LAYBACK TOP 1/3 BURLAP
BLADE.
1'-6"
FROM ROOT BALL
NON-BIODEGRADEABLE MATERIAL
PLANTING SOIL MIXTURE SHALL BE REMOVED.
PLANTING SOIL MIXTURE
6"
SCARIFY SUBSOIL
ROOT BALL TO REST ON UNDISTURBED DRAWING NAME:
SUBGRADE
95% COMPACTED OR UNDISTURBED Landscape Notes
SUBGRADE
2-3 x WIDER THAN ROOT BALL
& Details
SECTION Date: 07/20/26
NOTE: PLANT BULBS IN TRENCHES AND BOUQUET PLANTING GROUPS. DECIDUOUS TREE PLANTING - MULTI - STEM Drawn By:
Scale:
C. Wood
As Noted
NO TO SCALE DRAWING NO.
GROUND COVER PLANT SPACING
NO TO SCALE
L-104
Project No: 24-4113
Page 1073 of 1174
Page 1074
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
(SHEET LP-102)
Greensboro
(DESIGNED
BY OTHERS)
S)
HER
(SHEET LP-101)
Y OT
(PLA 2)
NS B
10
(LP-
(SHEET LP-103)
Utica
LINE
LINE
SHEET LOCATION MAP
CH
CH
M AT
Buffalo
MAT
SCALE: N.T.S.
ST
OP
OP
ST
FUT
URE
1
80,3 -STOR
OP
ST 00 S Y RE
.F. TAIL
WV
DN
NOTE:
FUTURE DEVELOPMENT AREAS SHOWN DN
ON THIS PLAN SET ARE CONSIDERED
West Seneca Exchange
TO BE CONCEPTUAL ONLY.
WV
Slade Ave, Ridge Rd & Orchard Park Rd
WHO PROPO
LE SED
158 SALE R
-BW
-BW
76
,000 ETA
-BW
76
-BW
76
STOP
SF IL
76
STOP
MATCH LINE (LP-102)
NOTE:
IO
MATCH LINE (LP-101) OFFSITE IMPROVEMENTS SHOWN DESIGNED BY
PAT
West Seneca New York
FUT
UR OTHERS. REFER TO OFFSITE PLANS BY OTHERS
TOP S 130 E RETA
9,10 'x70' IL
STOP
FU 0 SF
RES TURE D
STOP
TAU RIVE
© CARMINA WOOD DESIGN
N
IO
UT
RAN -TH WV CA
IO
T 4, RU
CA
PAT
963
UT
IO
SF
N
STOP
N
IO
UT
CA
STOP CA
UT
IO
N
STOP
STOP
S TOP
CA
UT
GV
FU
IO
N
2,50 TURE
N
IO
UT
0
CA
BAN G.S.F.
STOP FU WV
K RES TURE D N
IO
UT
TAU RIV
CA
RAN E-TH
T 2, RU WV
380
STOP
STOP SF
WV
CA
UT
IO
N
STOP
STOP
CA
UT
STOP
IO
STOP
N
STOP
N
IO
UT
CA
FU
REST TURE D
STOP
AUR RIVE STOP
ANT -THR
, 2,3 U
00 S
CA
F
UT
IO
N
N
IO
STOP
UT
CA
GV
STOP
STOP STOP
STOP
Date
621
CA
UT
IO
N
CA
UT
IO
N
N
IO
UT
CA
N
STOP
IO
UT
CA
STOP
STOP STOP
CA
UT
IO
N
STOP
STOP
N
IO
UT
CA
PROPOSED STORMWATER
MANAGEMENT AREA
GV
ONLY
FU
No. Description
ONLY
STOP STOP STOP STOP 2,92 TURE
STOP 5
RET G.S.F.
STOP STOP STOP STOP STOP
AIL
REVISIONS:
STOP
STOP
STOP
STOP
STOP
STOP
STOP
FU
RES TURE D
TAU RIV
STOP
FUTURE RETAIL FUTURE RETAIL FUTURE RETAIL
RAN E-TH
T 2, RU
MAT
STOP
110'x200' FUTURE RETAIL 380
SF
CH
110'x200' 110'x200'
22,000 SF 22,000 SF
110'x200'
NOTE: STOP MAT LINE
22,000 SF 22,000 SF
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN CH (PLA
LINE NS B
NOTE: FUTURE SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. (LP- YO
RESTAURANT FUTURE RETAIL FUTURE RETAIL 103 THE
FUTURE DEVELOPMENT AREAS SHOWN ON THIS PLAN
100'x100' 100'x100' 100'x100' ) RS)
SET ARE CONSIDERED TO BE CONCEPTUAL ONLY. 10,000 SF EX. OFFICE
10,000 SF 10,000 SF 7,980 SF
STOP
STOP
Sealed 07/20/2026
STOP
GV
GV
(LP- 1)
10
)
103
LIGHTING PLAN SITE LEGEND
(LP-
LINE
PROPERTY LINE
LINE
CH
SCALE: 1"=100'
CH
MAT
DRAWING NAME:
MAT
PROPOSED CONCRETE CURB
Lighting Plan
PROPOSED SIDEWALK / CONCRETE PAD
Overall
NUMBER OF PARKING SPACES
27
PROPOSED SIGN
Date: 07/20/26
PROPOSED STANDARD DUTY Drawn By: C. Wood
ASPHALT PAVEMENT Scale: As Noted
PROPOSED LIGHT POLE DRAWING NO.
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,LP-100
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
100 0 100 200Ft. Project No: 24-4113
100'
Page 1074 of 1174
Page 1075
MATCHLINE (LP-102)
MATCHLINE (LP-101)
IO
PAT
FUT
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
URE
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
(SHEET LP-102)
Greensboro
(DESIGNED TS OP S
TOP 130 RETA
BY OTHERS)
FU 9,10 'x70' IL
CURRENT
RES TURE D 0 SF
STOP
SHEET TAU RIVE
RAN -TH
IO
T 4, RU
PAT
(SHEET LP-103) 963
SF
Utica
STOP
STOP
SHEET LOCATION MAP STOP
STOP
S
Buffalo
TOP
SCALE: N.T.S.
113LF
8" PVC
@ 0.50
FU
%
2,50 TURE
0 G. STOP FU
BAN S.F. RES TURE D
K TAU RIV
RAN E-TH
T 2, RU
380
STOP
STOP SF
STOP
STOP
STOP STOP
STOP
West Seneca Exchange
FU
RES TURE D
STOP
TAU RIV STOP
RAN E-TH
Slade Ave, Ridge Rd & Orchard Park Rd
T, 2 RU
,300
SF
STOP
STOP
STOP STOP
STOP
West Seneca New York
© CARMINA WOOD DESIGN
STOP
STOP
STOP STOP
STOP
STOP
PROPOSED STORMWATER
MANAGEMENT AREA
Date
STOP STOP STOP STOP STOP STOP STOP STOP STOP
No. Description
STOP
REVISIONS:
STOP
STOP
STOP
STOP
01)
LP-1
STOP
FUTURE RETAIL
(
FUTURE RETAIL
INE
FUTURE RETAIL
STOP
FUTURE RETAIL
CHL
110'x200'
3)
Sealed 07/20/2026
110'x200'
P-10
110'x200'
MAT
22,000 SF 110'x200'
E (L
22,000 SF 22,000 SF 22,000 SF
IN
CHL
MAT
FUTURE
RESTAURANT FUTURE RETAIL SITE LEGEND FUTURE RETAIL
100'x100' 100'x100' PROPERTY LINE
100'x100'
10,000 SF 10,000 SF 10,000 SF
PROPOSED CONCRETE CURB
DRAWING NAME:
PROPOSED SIDEWALK / CONCRETE PAD
STOP
STOP Lighting Plan
NUMBER OF PARKING SPACES
27
PROPOSED SIGN
PROPOSED STANDARD DUTY
ASPHALT PAVEMENT Date: 07/20/26
Drawn By: C. Wood
PROPOSED LIGHT POLE Scale: As Noted
DRAWING NO.
LIGHTING PLAN NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
LP-101
SCALE: 1"=40' 40 0 40 80Ft.
40' Project No: 24-4113
Page 1075 of 1174
Page 1076
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
CURRENT
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
Greensboro
SHEET
(DESIGNED
BY OTHERS)
(SHEET LP-101)
(SHEET LP-103)
Utica
SHEET LOCATION MAP
Buffalo
S T
SCALE: N.T.S.
OP
OP
ST
West Seneca Exchange
FUT
URE
Slade Ave, Ridge Rd & Orchard Park Rd
1
80,3 -STOR
00 S Y RE
P O
ST
.F. TAIL DN
West Seneca New York
© CARMINA WOOD DESIGN
WV
) S
HER
Y OT
Date
)
102
NS B
(LP-
(PLA
INE
INE
CHL
CHL
W
MAT
-B
W
76
-B
MAT
-BW
76
-BW
76
STOP
No. Description
76
STOP
REVISIONS:
MATCHLINE (LP-102)
MATCHLINE (LP-101)
IO
PAT
FUT
URE
STOP 130 RETA
9,10 'x70' IL
STOP
Sealed 07/20/2026
FU 0 SF
RESTTURE D
STOP
AUR RIVE- WV
ANT THR
IO
4,96 U
CA
PAT
UT
3 SF
IO
N
STOP
N
IO
UT
CA
STOP
STOP SITE LEGEND
STOP
STOP
PROPERTY LINE
CA
PROPOSED CONCRETE CURB
UT
FUT
IO
N
DRAWING NAME:
2,50 URE
N
IO
PROPOSED SIDEWALK / CONCRETE PAD
UT
0 G. Lighting Plan
CA
STOP FUT
BAN S.F. RES URE D
K TAU RIV NUMBER OF PARKING SPACES
27
RAN E-TH
T 2, RU WV
380
STOP
STOP PROPOSED SIGN
SF
PROPOSED STANDARD DUTY
ASPHALT PAVEMENT
STOP
Date: 07/20/26
STOP
Drawn By: C. Wood
PROPOSED LIGHT POLE Scale: As Noted
STOP STOP
S TO P DRAWING NO.
FU
RES TURE D LIGHTING PLAN NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
LP-102
STOP
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
TAU RIV STOP
RAN E-TH SCALE: 1"=40' 40 0 40 80Ft.
T, 2 RU 40'
,300 Project No: 24-4113
SF
Page 1076 of 1174
Page 1077
STOP
CA
UT
IO
N
MAT
CHL
N
IO
UT
INE
CA
MAT
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
(LP-
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
(SHEET LP-102) CHL 102)
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
INE
Greensboro
STOP (LP-
(DESIGNED 101) MAT
BY OTHERS) CHL
MAT INE
CA
(BY
UT
CHL
IO
OTH
N
(SHEET LP-101) INE
(LP- E RS)
N
IO
UT
103)
CA
CURRENT SHEET
Utica
SHEET LOCATION MAP
CA
UT
Buffalo
IO
N
CA
UT
IO
N
SCALE: N.T.S.
N
IO
UT
CA
N
IO
UT
CA
CA
UT
IO
N
N
IO
UT
CA
PROPOSED STORMWATER
MANAGEMENT AREA
West Seneca Exchange
FUT
Slade Ave, Ridge Rd & Orchard Park Rd
2,92 URE
5 G.
RET S.F. STOP
AIL
West Seneca New York
STOP
STOP
© CARMINA WOOD DESIGN
STOP
FU
RES TURE D
) 101
TAU RIV
STOP
RAN E-TH MAT
(LP-
T 2, RU CHL
STOP
380 MAT INE
INE
SF CHL (BY
INE OTH
CHL
(LP-
103) ERS)
103)
STOP
MAT
(LP- E
HLIN
FUTURE RETAIL
Date
FUTURE RETAIL
C
RESTAURANT
MAT
100'x100' 100'x100'
10,000 SF EX. OFFICE
10,000 SF 7,980 SF
STOP
STOP
No. Description
REVISIONS:
STOP
Sealed 07/20/2026
LIGHTING PLAN
SCALE: 1"=40'
SITE LEGEND
PROPERTY LINE
PROPOSED CONCRETE CURB
DRAWING NAME:
PROPOSED SIDEWALK / CONCRETE PAD
Lighting Plan
NUMBER OF PARKING SPACES
27
PROPOSED SIGN
PROPOSED STANDARD DUTY
ASPHALT PAVEMENT Date: 07/20/26
Drawn By: C. Wood
PROPOSED LIGHT POLE Scale: As Noted
DRAWING NO.
LP-103
NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
40 0 40 80Ft.
40' Project No: 24-4113
Page 1077 of 1174
Page 1078
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145
© CARMINA WOOD DESIGN sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
REVISIONS:
Date:
Scale:
No. Description Date
Drawn By:
West Seneca Exchange
Project No:
DRAWING NO.
Slade Ave, Ridge Rd & Orchard Park Rd
DRAWING NAME:
West Seneca New York
24-4113
Buffalo Utica Greensboro
Lighting Details
LP-104
Page 1078 of 1174
07/20/26
As Noted
C. Wood
Sealed 07/20/2026
Page 1079
July 22, 2026
Jeffrey Schieber, Code Enforcement Officer
Town of West Seneca
1250 Union Road
West Seneca, NY 14224
Re: Seneca Mall Redevelopment
Orchard Park Rd, Slade Ave, Ridge Rd
West Seneca, NY
Mr. Schieber:
On behalf of our client, Benchmark Streamline, LLC, we are submitting the following information
and documents for a Site Plan Review Application. This letter shall also serve as the Letter of Intent
for this project.
Please find enclosed the following items:
(12) Copies of the Site Plan Application Form, dated 7/22/26
(12) Copies sets of West Seneca Exchange civil plan set w/ survey full size (24” x 36”), dated
and sealed 7/20/26
(12) Copies sets of Land Development Plans Costco Wholesale w/ survey full size (24” x 36”),
dated and sealed 7/17/26
(3) Copies of the West Seneca Exchange SWPPP, dated July 2026
(3) Copies of the West Seneca Exchange Engineer’s Report, dated July 2026
(3) Copies of the Costco Wholesale Stormwater Management Report, dated July 17, 2026
(12) copies of Costco Wholesale Colored Building Elevations, (11”x17”), dated February 2026
(12) copies of Costco Wholesale Colored Fuel Elevations(11”x17”), dated February 2026
(1) Application fee check for the amount of $17,350.00, check #
(1) Escrow Engineering Review fee check for the amount of $5,000.00, check #
It should be noted all documents listed above will also be provided to the Town electronically.
The project is a redevelopment of the site previously occupied by the Seneca Mall. This phase includes
the development of a 158,000 sf Costco Wholesale building which will also include an accessory fueling
facility along with the major infrastructure for approximately 225,000 sf of future
commercial buildings; the existing Tops Markets will remain. The project will include associated utility
improvements, parking improvements, landscaping and signage. Once specific tenants are secured,
supplemental submittals will be made detailing the future commercial development. Access to the site
will continue to be from Orchard Park Road and Slade Avenue. The site was recently rezoned to C-2(s).
Page 1079 of 1174
Page 1080
Site Access
The project will utilize driveway connections from Orchard Park Road and Slade Avenue for site access.
The existing signalized driveway across from Wegmans on Orchard Park Road and the existing signalized
driveway on Slade Avenue will be upgraded. An additional signalized driveway will be installed across
from the existing driveway to the Ellicott Development parcel to the west. Off-site roadway
improvements and modifications to Orchard Park Road and Slade Avenue are also proposed, as shown on
the Site Plan. These improvements were designed in accordance with the recommendations in the Traffic
Report prepared by Passaro. All driveway and off-site improvement plans have been submitted to Erie
County Highway (Slade Ave) and NYSDOT (Orchard Park Road/Ridge Road) for their review.
Grading/Storm Drainage
The project site is currently graded towards existing drainage structures throughout the site
and drains to the existing surrounding public storm sewer infrastructure. It is the intent to grade and
slope the proposed parking areas to proposed onsite catch basins and to reuse the existing storm
connections. There is not currently any storm water management on site.
The proposed redevelopment will collect and convey stormwater through a system of catch basins, yard
drains, manholes, HDPE storm sewer pipe, and a wet pond designed to accommodate the ultimate build
out of the site. The project will require coverage under the NYSDEC SPDES General Permit for Stormwater
Discharges from Construction Activity (GP-0-25-001) because the area of disturbance exceeds 1 acre and
will be reviewed under the NYSDEC redevelopment guidelines. The proposed stormwater management
system provides the required Water Quality Volume (WQv) treatment and peak flow attenuation in
accordance with Town of West Seneca and NYSDEC requirements before discharging to the existing storm
sewer system and ultimately to Cazenovia Creek.
Water/Sewer/Utilities
Utility upgrades for the project include significant modifications to the existing private water and sewer
mains on site.
A looped private water main system will utilize the existing water connection at Orchard Park Road and
add a new connection to the main on Slade Avenue. The proposed buildings will connect to the on site
private main. The proposed Costco will reuse the existing water connection on Ridge Road. Private
hydrants will be installed throughout the site to provide fire protection, Buildings will be sprinklered
where required by the NYS Building Code. All connections to the public mains will have backflow
preventers and meters approved by ECWA.
The majority of the existing private sanitary sewer system will be replaced, with the connection at Slade
Avenue being reused. The existing Tops will tie into this new private on-site system. The future buildings
along Slade Avenue will tie directly to the public main on Slade Avenue. A downstream sanitary sewer
capacity analysis (DSCA) was completed and previously submitted to the town as part of the rezoning
process. The DSCA did not indicate any capacity issues and I/I mitigation will be provided as part of the
project in accordance with NYSDEC and Town requirements.
Page 1080 of 1174
Page 1081
The proposed buildings will connect to the public gas, electric and telephone infrastructure in the
adjacent right of ways.
Wetlands/Flood Plain
State or Federal Wetlands are not present on site, nor are 100-year or 500-year floodplain.
If you should have any questions regarding this letter, please contact me at (716) 550-3342. Thank
you.
Sincerely,
Christopher Wood, PE | President, Civil Engineering
Page 1081 of 1174
Page 1082
Page 1082 of 1174
Page 1083
9 1
6 7
DD31-01. COPING, DD31-01.
32'-0"
"MEDIUM BRONZE" TO CORNICE
31'-0"
TO COPING
15'-7"
TO ROOFING
0'-0"
FIN FLR
MCELROY METAL MEGA PANEL, MCELROY METAL MEGA PANEL, SMOOTH FACE CMU, MCELROY METAL MEGA PANEL,
"OLD TOWN GRAY" "MYSTIQUE PLUS" "GRAY" "OLD TOWN GRAY"
FRONT ELEVATION
1 SCALE: 1/16" = 1'-0"
A A.7 G SB SE SH
7 ENTRY SIGNAGE
6 CENTER TO
8 DD31-01.
DD31-01. 32'-0" OPENING
DD31-01.
29'-6" COPING, TO CORNICE
32'-0" "MEDIUM BRONZE" ROOFING
TO COPING
TO COPING 29'-6" AFF
TO COPING
19'-4" AFF
18'-0"
BO ACCENT
TO COPING
BAND
0'-0" 0'-0"
FIN FLR FIN FLR
MCELROY METAL MEGA PANEL, MCELROY METAL MEGA PANEL, SMOOTH FACE CMU, MCELROY METAL MEGA PANEL,
"OLD TOWN GRAY" "MYSTIQUE PLUS" "GRAY" "OLD TOWN GRAY"
RIGHT ELEVATION GRID-S.2 WALL ELEVATIONS
2 SCALE: 1/16" = 1'-0"
3 SCALE: 1/16" = 1'-0"
1 10 13
6
DD31-01.
32'-0" COPING,
TO COPING "MEDIUM BRONZE"
31'-0"
29'-6"
TO COPING
TO COPING
19'-4" 15'-7"
BO ACCENT TO ROOF
BAND
0'-0"
FIN FLR
MCELROY METAL MEGA PANEL, MCELROY METAL MEGA PANEL, SMOOTH FACE CMU, MCELROY METAL MEGA PANEL,
"MYSTIQUE PLUS" "OLD TOWN GRAY" "GRAY" "MYSTIQUE PLUS"
REAR ELEVATION
4 SCALE: 1/16" = 1'-0"
G A AA 4
DD31-01.
COPING, MCELROY METAL MEGA PANEL,
"MEDIUM BRONZE" "OLD TOWN GRAY"
31'-0" 31'-0"
TO COPING TO COPING
5 2
DD31-01. DD31-01.
18'-9"
19'-4" TO ROOF
BO ACCENT
BAND
SIDING PROFILE
3'-4"
1.
DD 3
-0
1
31
TO CMU 1' - 0" 7 1/4" DD31-01.
0'-0"
1 1/2"
1 1/2"
FIN FLR
MCELROY METAL MEGA PANEL, MCELROY METAL MEGA PANEL, SMOOTH FACE CMU, BUTLER RIB II McELROY METAL MEGA RIB / METAL SALES IC72
"OLD TOWN GRAY" "MYSTIQUE PLUS" "GRAY"
LEFT ELEVATION 1' - 0" INTERIOR
5
1 1/2"
EXTERIOR
2" UNO
SCALE: 1/16" = 1'-0"
BUTLER INSULATED EMBOSSED METAL PANEL
SHADOWALL (KINGSPAN KS SERIES AZTECO)
WEST SENECA, NY
NOTE:
LOCATE AS DIRECTED BY FIRE MARSHALL
1'- 0" MIN
32' - 0"
EQ 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" EQ
1234567890
6' - 0" 6' - 0" ALUMINUM COMPOSITE
26' - 8" MATERIAL - COSTCO RED
2' - 0"
10" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 1' - 10"
SIGNAGE AREA TABULATION (WALL SIGNAGES)
4' - 11 1/2"
2" REVERSE PAN
6' - 0"
6' - 7"
QTY SIGN SIZE AREA (SF) EA TOTAL SF
3 COSTCO WHOLESALE 6'-0" "C" 251 SF 753
2' - 0"
17' - 4" 1 COSTCO WHOLESALE 5'-0" "C" 174 SF 174
2' - 2"
1 TIRE CENTER 17'-4" X 1'-9" 31 SF 31
5' - 0"
7' - 3 1/2"
TOTAL SIGNAGE AREA 958
1' - 9"
ALIGN NOTE:
31' - 0" PROVIDE BACK PANEL ON ALL SIGNAGE EXCEPT
1' - 10"
WHEN APPLIED TO SOLID FLAT SURFACE; E.G., 20'-9" 4' - 0"
CMU, TEXTURED PANELS, ETC. BO SIGNAGE TYP ALIGN
BUILDING SIGNAGE ENTRY SIGNAGE LOCATION SIGNAGE
6 SCALE: 1/8" = 1'-0" 0425 (SUPPLIED AND INSTALLED BY MBS)
7 SCALE: 1/8" = 1'-0" 0425 (SUPPLIED AND INSTALLED BY MBS)
8 SCALE: 1/8" = 1'-0" 0425 (SUPPLIED AND INSTALLED BY MBS)
24-5890-01
FEBRUARY 2026
COLOR BUILDING
ELEVATIONS
COSTCO WHOLESALE COLOR BUILDING ELEVATIONS DD31-01.
© MG2, Inc. All rights reserved. No part of this document may be reproduced
WEST SENECA, NY FEBRUARY 2026 in any form or by any means without permission in writing from MG2.
Page 1083 of 1174
Page 1084
4 3 2 1
135' - 4"
16' - 8" 34' - 0" 34' - 0" 34' - 0" 16' - 8"
7 CENTER ON 1 7
13 CANOPY SIGN
7
19' - 8 1/2"
T.O. FASCIA
4' - 5"
13' 6" 13' 6"
15' - 4"
B.O. BEAM
12 13
8
MOUNT ON CANOPY FASCIA BY
CANOPY SUPPLIER, EACH SIDE DD42-02
OF CANOPY FOR INCOMING AND
OUTGOING TRAFFIC
A B C D
2
15' - 4"
AT FOREFROUND 3
1
4 2
DD42-01.
1
5
3
0"
REFERENCE DATUM
4
CANOPY AND DISPENSER ISLAND
1 SCALE: 1/4" = 1'-0"
2
DD42-01.
KEYPLAN
D C B A SCALE: 1" = 10'-0"
119' - 0"
22' - 3" 28' - 0" 18' - 6" 28' - 0" 22' - 3"
MOUNT ON CANOPY FASCIA
CENTER ON
EXTERIOR FINISH SCHEDULE
BY CANOPY SUPPLIER, 7
CENTER ON ALL FOUR CANOPY SIGN
7 13 1
SIDES OF CANOPY.
19' - 8 1/2"
T.O. FASCIA # ITEM MATERIAL FINISH COLOR MANUFACTURER / NOTES
1 FASCIA ENG. ARCH. PANEL PRE-FINISED TAUPE DARK METAL SPAN - MEGA RIB
2 CONTROLLER ENCLOSURE METAL KYNAR 500 YOKE WHITE PCTT80125 PPG
4' - 5"
3 ROOF METAL POWDER COATED YELLOW GREY RAL 7034 PPG
4 COLUMN METAL POWDER COATED MS19 SILVER PCT73106 PPG
15' - 4"
B.O BEAM
13 EXIT SIDE ENTRANCE SIDE
KEYNOTES
9 8
DD42-02 PRE-FINISHED METAL FASCIA PANEL - SUPPLIED AND INSTALLED BY CANOPY SUPPLIER UNDER
14 1 SEPARATE CONTRACT
12
2 COLUMN - SUPPLIED AND INSTALLED BY CANOPY SUPPLIER
UNDER SEPARATE CONTRACT
3
2 3 ACCESSIBLE MULTIPRODUCT DISPENSER
15' - 4"
CONCRETE-FILLED METAL FORMED GUARD AT ENDS OF ISLANDS - TOP OF GUARD AT 30"
4 ABOVE TRAFFIC SURFACE - PAINT SIDES ONLY WITH GLOSS BLUE.
8
RAISED CONCRETE ISLAND WITH METAL EDGE FORM - PAINT SIDES ONLY WITH GLOSS BLACK.
5
6 WASTE RECEPTOR, BOLT DOWN, CENTER OF EACH ISLAND (SOIC)
4 6
CANOPY FASCIA SIGN LIGHT FIXTURE (SOIC)
7
5 FIRE EXTINGUISHER AND CABINETS MOUNTED ON ENTRANCE SIDE OF COLUMNS - FIRE
10 8 EXTINGUISHER CABINET TO BE: BROOKS MODEL # MARK II, RED CABINET WITH CLEAR COVER
0" (OR EQUAL) - FIRE EXTINGUISHER AND CABINET, BY GC
REFERENCE DATUM
9 VIDEO CAMERA - VERIFY LOCATION WITH OWNER CONSTRUCTION PROJECT MANAGER. GC
PAVEMENT AT 1% SLOPE SHALL RUN CONDUIT AND INSTALL 3" ROUND OR OCTAGONAL J-BOX FOR MOUNTING CAMERAS.
MAX- VERIFY SLOPE WITH
CIVIL DRAWINGS
CANOPY AND DISPENSER ISLAND
10 CAULK PERIMETER OF DISPENSER BASE WITH PETROLEUM RESISTANT SEALANT, TYPICAL
2 SCALE: 1/4" = 1'-0"
11 RAIN LEADERS
12 FUEL INDICATOR LIGHT SYSTEM
13 COPING BOTTOM AND TOP OF FASCIA PANEL - COLOR MEDIUM BRONZE
TYPICAL ENCLOSURE SUPPLIER TO REMOVE 14 NO SMOKING / STOP ENGINE SIGNAGE (SOIC)
STEEL FACED INSULATED SCUPPER LIFTING LUGS & FILL HEX COUPLING
PANELS - PAINTED BY WITH SILICONE SEALANT, TYP
GUTTER ENCLOSURE SUPPLIER, TYP
WALL-
MOUNTED 8' - 6 5/8"
HEAT PUMP METER &
BEYOND
3 "COSTCO", "SAFETY RED" BACKER, 5'8" OUTLINE
UNIT SW4081 (RED)
DD42-02
AMP GFCI RECEPTACLE
DIS- AMP METER DISCONNECT SWITCH
2' - 5 1/4"
MANUAL CONNECT INSULATED
TRANSFER SWITCH HVAC CHASEWAY SAFETY GLASS
SWITCH CT CABINET BEYOND
CONCRETE WALKWAY
PVC DOWNSPOUT -
PAINTED BY
SLOPE
SLOPE
ENCLOSURE SUPPLIER "WHOLESALE" AND (3) STRIPES "LAPIS LAZULI" SW1805 (BLUE)
SLOPE SLOPE
SIGNAGE SHALL NOT PROJECT GREATER THAN 12" FROM WALL SURFACE
SLOPE SLOPE
GRADE 2% GRADE 2% WEST SENECA, NY
SIDE FACING AWAY FROM CANOPY ELECTRICAL ENTRY CANOPY SIGNAGE
3 4 4
ELECTRICAL STORAGE
6 8 SCALE: 1/2" = 1'-0"
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" DD42-02 DD42-02
BELL RINGER BY GC 3'-0" WIDE 3'-0" WIDE
GUTTER DOOR DOOR
NOTE: SLOPE LEVEL SLOPE
SLOPE
ALL EXPOSED METAL TO BE
SLOPE
SLOPE
PAINTED EDGE OF SLOPE DOWN EDGE OF
CONCRETE 4.1% CONCRETE INSULATED SAFETY GLASS
EMERGENCY
FLUSH
INSULATED SHUT-OFF
SAFETY GLASS
6" CURB 6" CURB TYPICAL
ALARM STEEL FACED INSULATED
ACKNOWLEDGEMENT NO CURB AT EDGE OF RAMP - 5 6" WIDE YELLOW SAFETY PAINT PANELS - PAINTED
SWITCH TURN DOWN EDGE OF RAMP
DD42-02
RAISED CONCRETE ISLAND WITH METAL
EDGE FORM - PAINT SIDES ONLY WITH
GLOSS BLACK, SEE SPEC
24-5890-01
SIDE FACING CANOPY STORAGE ENTRY CONTROLLER ENCLOSURE PLAN WARMING HUT
5 SCALE: 1/4" = 1'-0"
6 SCALE: 1/4" = 1'-0"
7 SCALE: 1/4" = 1'-0"
9 SCALE: 1/4" = 1'-0"
FEBRUARY
2026
COLORED FUEL
COSTCO WHOLESALE COLORED FUEL ELEVATIONS ELEVATIONS
DD42-02
© MG2, Inc. All rights reserved. No part of this document may be reproduced
WEST SENECA, NY FEBRUARY 2026 in any form or by any means without permission in writing from MG2.
Page 1084 of 1174
Page 1085
LAND DEVELOPMENT PLANS
CLINTON
FRANKLIN
ST. LAWRENCE
STATE OF VERMONT
ESSEX
JEFFERSON
ISSUED FOR PERMITTING
LEWIS
HAMILTON
WARREN
OSWEGO
ORLEANS WASHINGTON
MONROE WAYNE
NIAGARA
ONEIDA
HERKIMER SARATOGA
FULTON
SITE LOCATION
ONONDAGA
GENESEE
MONTGOMERY
MADISON SCHENEC TADY
ONTARIO
SENECA RENSSELAER
CAYUGA
WYOMING
ERIE LIVINGSTON OSTEGO
S
YATES SCHOHARIE ALBANY
SETT
CORTLAND
MASS TATE OF
CHENANGO
ACHU
TOMPKINS
SCHUYLER
COLUMBIA
S
CHAUTAUQUA ULSTER
CATTARAUGUS ALLEGANY STEUBEN DELAWARE
TIOGA
CHEMUNG
BROOME
ULSTER
STATE OF PENNSYLVANIA
DUTCHESS
CONNECTICUT
SULLIVAN
STATE OF
PUTNAM
ORANGE
COSTCO WHOLESALE
ST
AT WESTCHESTER
EO
FN ROCKLAND
EW
JE
RS SUFFOLK
EY
BRONX
K
R
SLADE AVENUE
MUNICIPAL LOCATION
YO
W
QUEENS
NE
NASSUA
KINGS
RICHMOND
LOCATION MAP WEST SENECA, NEW YORK VICINITY MAP
N.T.S. SCALE: 1"=800'
CONTENTS
Sheet Number
Sheet Title
G0.00 COVER SHEET
G0.01 GENERAL NOTES
AL-1 ALTA NSPS LAND TITLE SURVEY (SHEET 1 OF 4)
AL-1 ALTA NSPS LAND TITLE SURVEY (SHEET 2 OF 4)
AL-1 ALTA NSPS LAND TITLE SURVEY (SHEET 3 OF 4)
AL-1 ALTA NSPS LAND TITLE SURVEY (SHEET 4 OF 4)
C1.00 OVERALL SITE PLAN
C1.01 SITE PLAN
C1.02 SITE PLAN
C1.03 SITE PLAN
C1.04 SITE PLAN
C1.20 OVERALL TRUCK TURNING PLAN
C1.100 SITE DETAILS PREPARED FOR:
C1.101 SITE DETAILS
C1.102
C1.103
C1.104
SITE DETAILS
SITE DETAILS
SITE DETAILS
TOWN OF WEST SENECA
C2.00
C2.01
C2.02
C2.03
OVERALL GRADING PLAN
GRADING PLAN
GRADING PLAN
GRADING PLAN
1250 UNION ROAD WEST SENECA, NY 14224
C2.04 GRADING PLAN
C2.50 OVERALL DRAINAGE PLAN
C2.51 DRAINAGE PLAN
C2.52 DRAINAGE PLAN
C2.53 DRAINAGE PLAN
C2.54 DRAINAGE PLAN
C2.100
C2.101
GRADING AND DRAINAGE DETAILS
GRADING AND DRAINAGE DETAILS
PREPARED BY:
C2.102 GRADING AND DRAINAGE DETAILS
C2.103 GRADING AND DRAINAGE DETAILS
ARCHITECTURE
C3.00 OVERALL SITE UTILITY PLAN ENGINEERING
C3.01 SITE UTILITY PLAN ENVIRONMENTAL
C3.02 SITE UTILITY PLAN
LAND SURVEYING
C3.03 SITE UTILITY PLAN
C3.04 SITE UTILITY PLAN ISSUED FOR PERMITTING
C3.100
C3.101
SITE UTILITY DETAILS
SITE UTILITY DETAILS
NOT RELEASED FOR CONSTRUCTION
C4.00 OVERALL EROSION AND SEDIMENT CONTROL PLAN 355 Research Parkway
C4.01 EROSION AND SEDIMENT CONTROL PLAN Meriden, CT 06450
C4.02
C4.03
EROSION AND SEDIMENT CONTROL PLAN
EROSION AND SEDIMENT CONTROL PLAN
(203) 630-1406 DEVELOPER: OWNER:
C4.04 EROSION AND SEDIMENT CONTROL PLAN CALIBER COMMERCIAL BROKERAGE LLC S & R COMPANY OF WEST SENECA
C4.100 EROSION AND SEDIMENT CONTROL PLAN DETAILS 394 E HENRIETTA ROAD PO BOX 1027
C5.00 OVERALL LANDSCAPING PLAN
ROCHESTER NY, 14620 BUFFALO NY, 14240
C5.01 LANDSCAPING PLAN
C5.02 LANDSCAPING PLAN
C5.03 LANDSCAPING PLAN
C5.04
C5.10
LANDSCAPING PLAN
LANDSCAPING NOTES AND DETAILS
DATES
C5.50 OVERALL IRRIGATION PLAN
C5.51 IRRIGATION PLAN
ISSUE DATE: 07/17/2026
C5.52 IRRIGATION PLAN
C5.53 IRRIGATION PLAN
C5.54 IRRIGATION PLAN
C5.55 IRRIGATION NOTES
SE-1 LIGHTING PLAN 7/17/2026
CAD FILE: G2401824-00 BL PROJECT NUMBER: 2401824
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1085 of 1174
Page 1086
SITE WORK GENERAL NOTES
Land Surveying
Environmental
Architecture
Engineering
1. THESE PLANS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT FOR CONSTRUCTION. 50. ASBESTOS OR HAZARDOUS MATERIAL, IF FOUND ON SITE, SHALL BE REMOVED BY A LICENSED HAZARDOUS MATERIAL ABATEMENT CONTRACTOR. 101. THE CONTRACTOR SHALL ARRANGE AND COORDINATE WITH UTILITY PROVIDERS FOR WORK TO BE PERFORMED BY UTILITY PROVIDERS. THE CONTRACTORDEFINITIONS
SHALL PAY ALL
UTILITY FEES UNLESS OTHERWISE STATED IN THE PROJECT SPECIFICATION MANUAL AND GENERAL CONDITIONS, AND REPAIR PAVEMENTS AS NECESSARY.
2. ALL CONSTRUCTION SHALL COMPLY WITH THE PROJECT SPECIFICATION MANUAL; COSTCO CORPORATION STANDARDS, MUNICIPAL STANDARDS AND SPECIFICATIONS,
51. THE CONTRACTOR
COUNTY SHALL PREPARE ALL MANIFEST DOCUMENTS AS REQUIRED PRIOR TO COMMENCEMENT OF DEMOLITION. MUNICIPALITY SHALL MEAN TOWN OF WEST SENECA
STANDARDS AND SPECIFICATIONS, NEW YORK DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS, 2010 ADA STANDARDS, AND STATE BUILDING CODE IN 102. ELECTRIC, AND TELECOMMUNICATIONS SERVICES SHALL BE INSTALLED UNDERGROUND IN ACCORDANCE WITH LOCAL UTILITY PROVIDER REGULATIONS. THE CONTRACTOR
52. THE
THE ABOVE REFERENCED INCREASING HIERARCHY. ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE OSHA, FEDERAL, STATE ANDCONTRACTOR
LOCAL SHALL CUT AND PLUG, OR ARRANGE FOR THE APPROPRIATE UTILITY PROVIDER TO CUT AND PLUG ALL SERVICE PIPING AT THE STREET LINE SHALL
OR AT THE MAIN,AND INSTALL AND BACKFILL PVC CONDUITS FOR TELECOMMUNICATIONS SERVICE, PVC CONDUITS FOR ELECTRIC SERVICE PRIMARY, PVC CONDUITS
PROVIDE COUNTY SHALL
FOR MEAN ERIE COUNTY
REGULATIONS. AS REQUIRED BY THE UTILITY PROVIDER, OR AS OTHERWISE NOTED OR SHOWN ON THE CONTRACT DRAWINGS. ALL SERVICES MAY NOT BE SHOWN ON THIS PLAN. THE SECONDARY PER BUILDING ELECTRICAL PLANS, (SCHEDULE 80 UNDER PAVEMENT, SCHEDULE 40 IN NON PAVEMENT AREAS). SERVICES MAY BE INSTALLED IN A
ELECTRICAL
CONTRACTOR SHALL INVESTIGATE THE SITE PRIOR TO BIDDING TO DETERMINE THE EXTENT OF SERVICE PIPING TO BE REMOVED, CUT OR PLUGGED. THE CONTRACTOR
COMMON SHALL STATE SHALL
TRENCH WITH 12" CLEAR SPACE BETWEEN. MINIMUM COVER IS 36" ON ELECTRIC CONDUITS, AND 24" ON TELECOMMUNICATIONS CONDUITS. SERVICES SHALLMEAN
BE NEW YORK
3. REFER TO OTHER PLANS BY OTHER DISCIPLINES, DETAILS AND PROJECT MANUAL FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL VERIFY ALL SITE AND
PAYBUILDING
ALL UTILITY PROVIDER FEES FOR ABANDONMENTS AND REMOVALS. MARKED WITH MAGNETIC LOCATOR TAPE AND SHALL BE BEDDED, INSTALLED, AND BACKFILLED IN ACCORDANCE WITH ELECTRIC UTILITY PROVIDER, AND
CONDITIONS IN THE FIELD AND CONTACT THE CIVIL ENGINEER AND ARCHITECT IF THERE ARE ANY QUESTIONS OR CONFLICTS REGARDING THE CONSTRUCTION DOCUMENTS TELECOMMUNICATIONS COMPANY STANDARDS. GALVANIZED STEEL ELECTRICAL CONDUIT SHALL BE USED AT POLE AND TRANSFORMER LOCATIONS. INSTALL WATER UTILITY PROVIDER
HANDHOLES AS SHALL MEAN ERIE COUNTY WATER AUHTORITY
53. THE SHALL
AND/OR FIELD CONDITIONS, SO THAT APPROPRIATE REVISIONS CAN BE MADE PRIOR TO BIDDING. ANY CONFLICT BETWEEN THE DRAWINGS AND SPECIFICATIONS CONTRACTOR
BE SHALL PROTECT ALL IRON PINS, MONUMENTS AND PROPERTY CORNERS DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. ANY CONTRACTOR REQUIRED TO FACILITATE INSTALLATION AND AS REQUIRED BY UTILITY PROVIDER. INSTALL TRAFFIC LOAD QUALIFIED HANDHOLES IN VEHICULAR AREAS. INSTALL CONCRETE
CONFIRMED WITH THE OWNER'S CONSTRUCTION MANAGER PRIOR TO BIDDING. DISTURBED PINS, MONUMENTS, AND OR PROPERTY CORNERS, ETC. SHALL BE RESET BY A LICENSED LAND SURVEYOR AT THE EXPENSE OF THE CONTRACTOR. ENCASEMENT ON PRIMARY ELECTRIC CONDUITS. SANITARY UTILITY PROVIDER SHALL MEAN TOWN OF WEST SENECA
4. DO NOT INTERRUPT EXISTING UTILITIES SERVICING FACILITIES OCCUPIED AND USED BY THE OWNER OR OTHERS DURING OCCUPIED HOURS EXCEPT WHEN 54.SUCH
THE DEMOLITION CONTRACTOR SHALL STABILIZE THE SITE AND KEEP EROSION CONTROL MEASURES IN PLACE UNTIL THE COMPLETION OF THE WORK OR 103.
UNTIL THE
ALL WATER LINES TO HAVE A MINIMUM COVER ADHERING TO COSTCO AND WEST SENECA WATER DIVISION STANDARDS. ALL LINES SHALL BE BEDDED AND GAS UTILITY PROVIDER
BACKFILLED IN SHALL MEAN NATIONAL FUEL
INTERRUPTIONS HAVE BEEN AUTHORIZED IN WRITING BY THE OWNER AND THE LOCAL MUNICIPALITIES. INTERRUPTIONS SHALL ONLY OCCUR AFTER ACCEPTABLE COMMENCEMENT
TEMPORARY OF WORK BY THE SITE CONTRACTOR, WHICHEVER OCCURS FIRST, AS REQUIRED OR DEEMED NECESSARY BY THE ENGINEER OR OWNER'S REPRESENTATIVE.
ACCORDANCE WITH LOCAL UTILITY AND/OR MANUFACTURER REQUIREMENT.
SERVICE HAS BEEN PROVIDED. THE SITE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR THE MAINTENANCE OF EXISTING EROSION AND SEDIMENTATION CONTROLS AND FOR INSTALLATION OF ANY NEW TELECOMMUNICATIONS UTILITY PROVIDER SHALL MEAN SPECTRUM
SEDIMENT AND EROSION CONTROLS AS PER THE SEDIMENT AND EROSION CONTROL PLAN, AT THAT TIME. 104. ALL WATER MAINS, WATER SERVICES AND SANITARY SEWER LATERALS SHALL CONFORM TO THE APPLICABLE WATER UTILITY PROVIDER SPECIFICATIONS, AND TO THE
5. THE CONTRACTOR SHALL ABIDE BY ALL OSHA, FEDERAL, STATE, AND LOCAL REGULATIONS WHEN OPERATING CRANES, BOOMS, HOISTS, ETC. IN CLOSE PROXIMITY TO APPLICABLE SANITARY SEWER PROVIDER SPECIFICATIONS, AS WELL AS TO OTHER APPLICABLE INDUSTRY CODES (AWWA) AND PROJECT SPECIFICATIONS ELECTRIC UTILITY
FOR POTABLE PROVIDER SHALL MEAN NEW YORK STATE ELECTRIC AND GAS
WATER
OVERHEAD ELECTRIC LINES. IF CONTRACTOR MUST OPERATE EQUIPMENT CLOSE TO ELECTRIC LINES, CONTACT POWER COMPANY TO MAKE ARRANGEMENTS 55.FOR
THE CONTRACTOR SHALL PUMP OUT BUILDING FUEL AND WASTE OIL TANKS (IF ANY ARE ENCOUNTERED) AND REMOVE FUEL TO AN APPROVED DISPOSAL AREA SYSTEMS,
PROPER BY A LICENSED
AND FOR SANITARY SEWER SYSTEMS.
SAFEGUARDS. ANY UTILITY COMPANY FEES SHALL BE PAID FOR BY THE CONTRACTOR. WASTE OIL HANDLING CONTRACTOR IN STRICT ACCORDANCE WITH STATE REQUIREMENTS. DOT SHALL MEAN THE NEW YORK STATE DEPARTMENT OF TRANSPORTATION
105. THE CONTRACTOR SHALL MAINTAIN ALL FLOWS AND UTILITY CONNECTIONS TO EXISTING BUILDINGS WITHOUT INTERRUPTION UNLESS/UNTIL AUTHORIZED TO DISCONNECT 355 Research Parkway
6. CONTRACTOR SHALL SUBMIT AN AS-BUILT TOPOGRAPHIC SURVEY PREPARED AND STAMPED BY A LICENSED LAND SURVEYOR TO DESIGN ENGINEER. AT THE 56.COMPLETION
IF IMPACTEDOFOR CONTAMINATED SOIL IS ENCOUNTERED BY THE CONTRACTOR, THE CONTRACTOR SHALL SUSPEND EXCAVATION WORK OF IMPACTED SOIL ANDBYNOTIFY THE
THE OWNERS, THE CIVIL ENGINEER, UTILITY PROVIDERS AND GOVERNING AUTHORITIES. Meriden, CT 06450
CONSTRUCTION. AS-BUILT SURVEY SHALL COMPLY WITH ALL NPDES NOTICE OF TERMINATION REQUIREMENTS, MUNICIPAL ORDINANCE REQUIREMENTS AND INCLUDE
OWNER ALLAND/OR
SITE OWNER'S ENVIRONMENTAL CONSULTANT PRIOR TO PROCEEDING WITH FURTHER WORK IN THE IMPACTED SOIL LOCATION UNTIL FURTHER INSTRUCTED BY (203) 630-1406
ELEMENTS, TOPOGRAPHY, STORM WATER MANAGEMENT FACILITY STRUCTURES/BASINS AND LANDSCAPE ELEMENTS. THE OWNER AND/OR OWNER'S ENVIRONMENTAL CONSULTANT. 106. THE CONTRACTOR MAY SUBSTITUTE MASONRY STRUCTURES FOR PRECAST STRUCTURES IF APPROVED BY THE CIVIL ENGINEER AND ALLOWED BY THE GOVERNING AUTHORITY
ENGINEER OR OTHER GOVERNING AUTHORITY.
7. THE ARCHITECT OR ENGINEER IS NOT RESPONSIBLE FOR SITE SAFETY MEASURES TO BE EMPLOYED DURING CONSTRUCTION. THE ARCHITECT AND ENGINEER 57. HAVE NO WATER SERVICES SHALL BE DISCONNECTED AND CAPPED AT MAIN IN ACCORDANCE WITH THE REQUIREMENTS OF THE WATER UTILITY PROVIDER. REMOVE
EXISTING
CONTRACTUAL DUTY TO CONTROL THE SAFEST METHODS OR MEANS OF THE WORK, JOB SITE RESPONSIBILITIES, SUPERVISION OR TO SUPERVISE SAFETY ANDEXISTING
DOES NOTONSITE WATER PIPING TO BE ABANDONED TO RIGHT OF WAY LINE UNLESS OTHERWISE SHOWN ON DEMOLITION PLANS OR AS REQUIRED BY THE WATER
107. UTILITY
PIPING SHALL BE LAID FROM DOWNGRADIENT END OF PIPE RUN IN AN UPGRADIENT DIRECTION WITH BELL END FACING UPGRADE IN THE DIRECTION OF PIPE LAYING.
VOLUNTARILY ASSUME ANY SUCH DUTY OR RESPONSIBILITY. PROVIDER TO BE REMOVED TO MAIN.
108. ALL RCP SHALL CONFORM TO THE REQUIREMENTS OF ASTM C-76; ALL RCP SHALL BE CLASS IV UNLESS OTHERWISE SHOWN. JOINTS SHALL BE WATERTIGHT AND CONFORM TO
8. THE CONTRACTOR SHALL COMPLY WITH CFR 29 PART 1926 FOR EXCAVATION, TRENCHING, AND TRENCH PROTECTION REQUIREMENTS. 58. EXISTING SANITARY LATERAL SHALL BE PLUGGED WITH NON-SHRINK GROUT AT CURB LINE OR AT MAIN CONNECTION IN ACCORDANCE WITH THE SANITARY UTILITY PROVIDER
THE REQUIREMENTS OF ASTM C-443.
REQUIREMENTS. REMOVE EXISTING LATERAL PIPING FROM SITE UNLESS OTHERWISE SHOWN ON DEMOLITION PLANS OR AS REQUIRED BY THE SANITARY UTILITY PROVIDER.
9. INFORMATION ON EXISTING UTILITIES AND STORM DRAINAGE SYSTEMS HAS BEEN COMPILED FROM AVAILABLE INFORMATION INCLUDING UTILITY COMPANY AND MUNICIPAL 109. MANHOLE SECTIONS AND CONSTRUCTION SHALL CONFORM TO ASTM C-478. ALL STORMWATER AND SANITARY MANHOLE CONNECTIONS SHALL BE GASKETED CONNECTIONS
OR COUNTY OR STATE RECORD MAPS AND/OR FIELD SURVEY AND IS NOT GUARANTEED CORRECT OR COMPLETE. UTILITIES AND STORM DRAINAGE SYSTEMS 59. ARE
DOMESTIC
SHOWNGASTO SERVICES SHALL BE CAPPED AND SERVICE LINES PURGED OF RESIDUAL GAS IN ACCORDANCE WITH THE GAS UTILITY PROVIDER REQUIREMENTS. WORK TO BE
ALERT THE CONTRACTOR TO THEIR PRESENCE AND THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DETERMINING ACTUAL LOCATIONS AND ELEVATIONS OF ALL COORDINATED BY AND PAID FOR BY THE CONTRACTOR. REMOVE EXISTING SERVICE PIPING ON SITE. ANY PROPANE TANKS SHALL BE PURGED OF RESIDUAL GAS
110. BY PROPANE
HIGH DENSITY POLYETHYLENE (HDPE) STORM SEWER LESS THAN 12" IN DIAMETER SHALL BE ADS N-12 WT OR APPROVED EQUAL. HDPE PIPE SHALL HAVE SMOOTH INTERIOR
UNDERGROUND AND OVERHEAD UTILITIES AND STORM DRAINAGE SYSTEMS INCLUDING SERVICES. THE CONTRACTOR SHALL VERIFY THE SIZE LOCATION AND SUPPLIER.
INVERT UPONCONTRACTOR SHALL COORDINATE THIS WORK AND PAY NECESSARY FEES. AND CORRUGATED EXTERIOR AND SHALL MEET THE REQUIREMENTS OF AASHTO 252, WATERTIGHT TYPE. GASKETS SHALL BE INSTALLED ON THE CONNECTION BY THE PIPE
COMMENCEMENT OF CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR THE RESTORATION OF ANY AND ALL UTILITIES ENCOUNTERED AND DISCONNECTED AS A RESULT OF MANUFACTURER. ALTERNATIVE HDPE PIPE MAY BE USED IF APPROVED BY THE ENGINEER AND OWNER'S CONSTRUCTION MANAGER PRIOR TO ORDERING.
THE CONSTRUCTION ACTIVITIES. 60. THE CONTRACTOR SHALL PROVIDE DISCONNECT NOTIFICATION TO THE MUNICIPALITY ENGINEERING DEPARTMENT, TELECOMMUNICATIONS UTILITY PROVIDER, GAS UTILITY
PROVIDER, ELECTRIC UTILITY PROVIDER, SANITARY UTILITY PROVIDER, AND WATER UTILITY PROVIDER AT LEAST THREE WEEKS PRIOR TO BEGINNING DEMOLITION.
111. DUCTILE IRON PIPE FOR STORM DRAINAGE PIPING SHALL CONFORM TO AWWA C151 FOR CLASS 52 WITH CEMENT LINING IN ACCORDANCE WITH ANSI A 21.4. DI STORM PIPE
10. PRIOR TO DEMOLITION OR CONSTRUCTION, THE CONTRACTOR SHALL CONTACT DIG SAFELY NEW YORK 72 HOURS BEFORE COMMENCEMENT OF WORK AT (800) 962-7962 OR SHALL BE PUSH ON JOINT WITH RUBBER GASKET.
AT 811 AND VERIFY ALL UTILITY AND STORM DRAINAGE SYSTEM LOCATIONS. THE CONTRACTOR SHALL EMPLOY THE USE OF A UTILITY LOCATING COMPANY61.
TO THE CONTRACTOR IS RESPONSIBLE FOR SECURING A DEMOLITION PERMIT FROM THE MUNICIPALITY BUILDING DEPARTMENT AND MUST FURNISH THE REQUIRED APPLICATION
PROVIDE
MATERIAL AND
SUBSURFACE UTILITY ENGINEERING CONSISTING OF DESIGNATING UTILITIES AND STORM PIPING ON PRIVATE PROPERTY WITHIN THE CONTRACT LIMIT AND CONSISTING OF PAY ALL FEES. 112. POLYVINYL CHLORIDE (PVC) PIPE FOR SANITARY PIPING SHALL HAVE BUILT-IN RUBBER GASKET JOINTS. PVC SHALL CONFORM TO ASTM D3034 (SDR35) WITH COMPRESSION 7/17/2026
DESIGNATING AND LOCATING WHERE PROPOSED UTILITIES AND STORM PIPING CROSS EXISTING UTILITIES AND STORM PIPING WITHIN THE CONTRACT LIMITS. STREET JOINTS AND MOLDED FITTINGS. PVC SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS, ASTM D2321 AND MANUFACTURER'S RECOMMENDED PROCEDURE.
LIGHTING AND TRAFFIC SIGNALS LOCATED WITHIN THE PUBLIC RIGHT-OF WAY MAY NOT BE MARKED OUT, AND A SEPARATE CONTACT MUST BE MADE. THE 62.CONTRACTOR
BACK FILL DEPRESSIONS, FOUNDATION HOLES AND REMOVED DRIVEWAY AREAS IN LOCATIONS NOT SUBJECT TO FURTHER EXCAVATION WITH SOIL MATERIAL APPROVED BY
SHALL BE RESPONSIBLE FOR ANY/ALL WORK TO RELOCATE ANY/ALL STREET LIGHTING EQUIPMENT TO MAINTAIN SYSTEM. THE OWNER'S GEOTECHNICAL ENGINEER AND COMPACT, FERTILIZE, SEED AND MULCH DISTURBED AREAS NOT SUBJECT TO FURTHER SITE CONSTRUCTION. DEMOLISHED
113. DUCTILE IRON PIPE FOR WATER PIPING SHALL CONFORM TO LOCAL JURISDICTION OR AWWA C151 FOR CLASS 52 WITH CEMENT LINING IN ACCORDANCE WITH ANSI A21.4 FOR
BUILDING FOUNDATION AREA AND BASEMENT IF PRESENT TO BE BACKFILLED WITH GRAVEL FILL OR MATERIAL SPECIFIED IN THE PROJECT GEOTECHNICAL REPORT
WATERIN MAINS
LIFT AND SERVICES 3” ID AND LARGER. JOINTS SHALL BE MADE WITH CONCRETE THRUST BLOCKS OR WITH MEGAULUG RETAINER GLANDS OR WITH RODDING IN
11. DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN OVER SCALED DIMENSIONS. THICKNESS SPECIFIED IN THE GEOTECHNICAL REPORT. COMPACT TO 95% MAX. DRY DENSITY PER ASTM D1557 AT MOISTURE CONTENT SPECIFIED IN GEOTECHNICAL REPORTWITH PROJECT MANUAL SPECIFICATIONS AND IN ACCORDANCE WITH WATER UTILITY PROVIDER REQUIREMENTS TO EXTEND A MINIMUM OF 2 PIPE LENGTHS IN
ACCORDANCE
AND EARTHWORK SPECIFICATION. EMPLOY WATERING EQUIPMENT FOR DUST CONTROL. EITHER DIRECTION FROM FITTINGS AND ELBOWS (40 FT MINIMUM). ALL OTHER JOINTS SHALL BE PUSH-ON WITH RUBBER GASKETS (TYTON). USE OF OTHER TYPES OF
12. SHOULD CONFLICTING INFORMATION BE FOUND WITHIN THE CONTRACT DOCUMENTS, IT IS INCUMBENT UPON THE CONTRACTOR TO REQUEST CLARIFICATION PRIOR TO RETAINER GLANDS SHALL REQUIRE USE WITH CLASS 53 OR GREATER DUCTILE IRON PIPE.
PROCEEDING WITH THE WORK. FOR BUDGETING PURPOSES, THE CONTRACTOR SHALL CARRY THE COST OF THE HIGHER QUALITY/QUANTITY OF WORK UNTIL 63. SUCH
THE CONTRACTOR
TIME THAT SHALL REPAIR PAVEMENTS BY INSTALLING TEMPORARY AND PERMANENT PAVEMENTS IN PUBLIC RIGHTS OF WAYS AS REQUIRED BY LOCAL GOVERNING
A CLARIFICATION IS RENDERED. AUTHORITIES AND THE STATE AND PER PERMIT REQUIREMENTS DUE TO DEMOLITION AND PIPE REMOVAL ACTIVITIES. 114. PVC WATER MAIN PIPING SHALL CONFORM TO AWWA C900.
64. THE CONTRACTOR SHALL CUT AND REMOVE AT LUMINARE AND SIGN LOCATIONS ANY PROTRUDING CONDUITS TO 24" BELOW GRADE. THE CONTRACTOR SHALL
13. ALL CONTRACTORS AND SUBCONTRACTORS SHALL OBTAIN COMPLETE DRAWING PLAN SETS FOR BIDDING AND CONSTRUCTION. PLAN SETS OR PLAN SET ELECTRONIC REMOVE
115. GAS ALL
PIPE MATERIAL SHALL BE PER GAS COMPANY REQUIREMENTS.
CABLE AND CONDUCTORS FROM REMAINING LIGHTING AND SIGNING CONDUITS TO BE ABANDONED. ANY REMAINING LIGHTING TO REMAIN IN PLACE SHALL BE RECIRCUITED
POSTINGS SHALL NOT BE DISASSEMBLED INTO PARTIAL PLAN SETS FOR USE BY CONTRACTORS AND SUBCONTRACTORS OF INDIVIDUAL TRADES. IT SHALL BE THE
OR REWIRED
CONTRACTOR'S AND SUBCONTRACTOR'S RESPONSIBILITY TO OBTAIN COMPLETE PLAN SETS OR COMPLETE PLAN SET ELECTRONIC POSTINGS FOR USE IN BIDDING AND AS NECESSARY TO REMAIN IN OPERATION. 116. GAS METER SHALL RECEIVE BOLLARD PROTECTION FOR THE ENTIRE METER ASSEMBLY. BOLLARDS SHALL BE SPACED AT MAXIMUM 5' O.C. SPACING UNLESS OTHERWISE
CONSTRUCTION. REQUIRED.
65. NO WORK ON THIS SITE SHALL BE INITIATED BY THE CONTRACTOR UNTIL A PRE-CONSTRUCTION MEETING WITH OWNER AND THE CIVIL ENGINEER IS PERFORMED. THE
14. ALL NOTES AND DIMENSION DESIGNATED AS "TYPICAL" OR "TYP" APPLY TO ALL LIKE OR SIMILAR CONDITIONS THROUGHOUT THE PROJECT. CONTRACTOR SHOULD BE AWARE OF ANY SITE INFORMATION AVAILABLE SUCH AS GEOTECHNICAL AND ENVIRONMENTAL REPORTS. THE CONTRACTOR SHALL HAVE DIG SAFELY
NEW YORK MARK OUTS OF EXISTING UTILITIES COMPLETED PRIOR TO MEETING.
15. CONTRACTOR(S) TO TAKE AND VERIFY ALL DIMENSIONS AND CONDITIONS OF THE WORK AND BE RESPONSIBLE FOR COORDINATION OF SAME. FIELD VERIFY ALL EXISTING
COSTCO WHOLESALE
CONDITIONS PRIOR TO START OF WORK. 66. THE CONTRACTOR SHALL ARRANGE FOR AND INSTALL TEMPORARY OR PERMANENT UTILITY CONNECTIONS WHERE INDICATED ON PLAN OR AS REQUIRED. MAINTAIN UTILITY
WEST SENECA, NEW YORK
SERVICES TO BUILDINGS OR TO SERVICES TO REMAIN. CONTRACTOR TO COORDINATE WITH UTILITY PROVIDERS FOR INSTALLATION AND PAY UTILITY PROVIDER FEES.
16. BL COMPANIES WILL PREPARE FINAL CONSTRUCTION DOCUMENTS SUITABLE FOR BIDDING AND CONSTRUCTION. PROGRESS SETS OF THESE DOCUMENTS ARE NOT SUITABLE
67.NOT
FOR THOSE PURPOSES. IF CLIENT ELECTS TO SOLICIT BIDS OR ENTER INTO CONSTRUCTION CONTRACTS UTILIZING CONSTRUCTION DOCUMENTS THAT ARE THE CONTRACTOR
YET FINAL, SHALL NOT COMMENCE DEMOLITION OR UTILITY DISCONNECTIONS UNTIL AUTHORIZED TO DO SO BY THE OWNER.
CONSULTANT SHALL NOT BE RESPONSIBLE FOR ANY COSTS OR DELAY ARISING AS A RESULT.
68. THE CONTRACTOR OR DEMOLITION CONTRACTOR SHALL INSTALL TEMPORARY SHEETING OR SHORING AS NECESSARY TO PROTECT EXISTING AND NEW BUILDINGS,
17. THE CONTRACTOR SHALL NOT PROCEED WITH ANY MODIFICATIONS TO THE DESIGN PLANS UNTIL THE WORK HAS BEEN APPROVED. ANY WORK DONE WITHOUTSTRUCTURES
THE APPROVALAND UTILITIES DURING CONSTRUCTION AND DEMOLITION. SHEETING OR SHORING SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER, LICENSED IN THIS
SLADE AVENUE
OF THE ENGINEER AND/OR CLIENT MAY BE DEEMED UNACCEPTABLE. STATE AND EVIDENCE OF SUCH SUBMITTED TO THE OWNER PRIOR TO INSTALLATION.
18. NO CONSTRUCTION OR DEMOLITION SHALL BEGIN UNTIL APPROVAL OF THE FINAL PLANS IS GRANTED BY ALL GOVERNING AND REGULATORY AGENCIES. 69. NO SALVAGE SHALL BE PERMITTED UNLESS PAID TO THE OWNER AS A CREDIT.
70. ANY EXISTING
19. THE OWNER IS RESPONSIBLE FOR OBTAINING ALL NECESSARY ZONING PERMITS REQUIRED BY GOVERNMENT AGCENIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL POTABLE WELL AND ANY EXISTING SEPTIC TANKS/ABSORPTION AREAS SHALL BE ABANDONED AND REMOVED PER THE SARATOGA COUNTY DEPARTMENT OF
HEALTH AND HEALTH CODE REQUIREMENTS.
CONTACT AND OBTAIN FROM COUNTY AND MUNICIPAL SOURCES ALL CONSTRUCTION PERMITS, INCLUDING ANY STATE DOT PERMITS, SEWER AND WATER CONNECTION
PERMITS, AND ROADWAY CONSTRUCTION PERMITS. THE CONTRACTOR SHALL POST ALL BONDS, PAY ALL FEES, PROVIDE PROOF OF INSURANCE AND PROVIDE TRAFFIC
CONTROL NECESSARY FOR THIS WORK. 71. THE CONTRACTOR SHALL PRESERVE EXISTING VEGETATION WHERE POSSIBLE AND/OR AS NOTED ON DRAWINGS. REFER TO SEDIMENT AND EROSION CONTROL PLAN FOR LIMIT
OF DISTURBANCE AND EROSION CONTROL NOTES.
20. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF ALL PRODUCTS AND MATERIALS PER PLANS AND SPECIFICATIONS TO THE OWNER AND CIVIL ENGINEER FOR REVIEW
AND APPROVAL PRIOR TO FABRICATION OR DELIVERY TO THE SITE. ALLOW A MINIMUM OF 14 WORKING DAYS FOR REVIEW. 72. TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON SITE FOR USE IN FINAL LANDSCAPING.
21. THE CONTRACTOR SHALL FOLLOW THE SEQUENCE OF CONSTRUCTION NOTES PROVIDED ON THE SEDIMENT AND EROSION CONTROL PLAN. 73. FILL WITHIN FORMER BUILDING FOUNDATION SHALL BE CHECKED BY TEST PIT AND PROOF-ROLLING AND SHALL BE OBSERVED BY THE OWNER'S GEOTECHNICAL ENGINEER.
SUBGRADE SHALL BE FORMED WITH REMOVAL AND REPLACEMENT OF FILL AND REMOVAL AND REPLACEMENT OF UNSUITABLE AND SOFT SUBGRADE MATERIAL AS REQUIRED BY
22. THE CONTRACTOR SHALL REFERENCE ARCHITECTURAL PLANS FOR EXACT DIMENSIONS AND CONSTRUCTION DETAILS OF BUILDING, AND THE RAISED CONCRETE THE GEOTECHNICAL ENGINEER. SEE GEOTECHNICAL REPORT AND EARTHWORK SPECIFICATIONS FOR FURTHER DESCRIPTION.
SIDEWALKS,
LANDINGS, RAMPS, AND STAIRS.
74. THE CONTRACTOR SHALL COMPACT FILL IN LIFT THICKNESS PER THE GEOTECHNICAL REPORT UNDER ALL PARKING, BUILDING, DRIVE, AND STRUCTURE AREAS TO 95% OF THE
MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D1557 (MODIFIED PROCTOR TEST), OR AS REQUIRED BY THE GEOTECHNICAL ENGINEER.
23. SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED, EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONSULT THE CIVIL ENGINEER
IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA.
75. UNDERDRAINS SHALL BE ADDED, IF DETERMINED NECESSARY IN THE FIELD BY THE OWNER/GEOTECHNICAL ENGINEER, AFTER SUBGRADE IS ROUGH GRADED.
24. ALL SITE DIMENSIONS ARE REFERENCED TO THE FACE OF CURBS OR EDGE OF PAVING AS APPLICABLE UNLESS OTHERWISE NOTED. ALL BUILDING DIMENSIONS ARE
REFERENCED TO THE OUTSIDE FACE OF THE STRUCTURE. 76. VERTICAL DATUM IS NY WEST ZONE - NAD 83
25. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TRAFFIC DEVICES FOR PROTECTION OF VEHICLES AND PEDESTRIANS CONSISTING OF DRUMS, BARRIERS, 77.SIGNS,
CLEARING LIMITS SHALL BE PHYSICALLY MARKED IN THE FIELD AND APPROVED BY THE MUNICIPALITY AGENT PRIOR TO THE START OF WORK ON THE SITE.
LIGHTS,
FENCES, TEMPORARY WALKWAYS, TRAFFIC CONTROLLERS AND UNIFORMED TRAFFIC OFFICERS AS REQUIRED OR AS ORDERED BY THE ENGINEER OR AS REQUIRED BY THE
LOCAL GOVERNING AUTHORITIES OR AS REQUIRED BY PERMIT STIPULATIONS OR AS REQUIRED BY THE OWNER. CONTRACTOR SHALL MAINTAIN ALL TRAFFIC 78.LANES
PROPER CONSTRUCTION PROCEDURES SHALL BE FOLLOWED ON ALL IMPROVEMENTS WITHIN THIS PARCEL SO AS TO PREVENT THE SILTING OF ANY WATERCOURSE OR
AND
PEDESTRIAN WALKWAYS FOR USE AT ALL TIMES UNLESS WRITTEN APPROVAL FROM THE APPROPRIATE GOVERNING AGENCY IS GRANTED. WETLANDS IN ACCORDANCE WITH THE REGULATIONS NYSDEC
OF THE
AND THE NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL],
LATEST EDITION. IN ADDITION, THE CONTRACTOR SHALL STRICTLY ADHERE TO THE SEDIMENT AND EROSION CONTROL PLAN CONTAINED HEREIN. THE CONTRACTOR SHALL BE
26. TRAFFIC CONTROL SIGNAGE SHALL CONFORM TO THE STATE DOT STANDARD DETAIL SHEETS AND THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. SIGNS RESPONSIBLE
SHALL BE TO POST ALL BONDS AS REQUIRED BY THE LOCAL MUNICIPALITIES, OR SOIL CONSERVATION
WHICH WOULD
DISTRICT
GUARANTEE THE PROPER
INSTALLED PLUMB WITH THE EDGE OF THE SIGN 2' OFF THE FACE OF THE CURB, AND WITH 7' VERTICAL CLEARANCE UNLESS OTHERWISE DETAILED OR NOTED.IMPLEMENTATION OF THE PLAN.
27. REFER TO DETAIL SHEETS FOR PAVEMENT, CURBING, AND SIDEWALK INFORMATION. 79. ALL SITE WORK, MATERIALS OF CONSTRUCTION, AND CONSTRUCTION METHODS FOR EARTHWORK AND STORM DRAINAGE WORK SHALL CONFORM TO THE SPECIFICATIONS
AND DETAILS AND APPLICABLE SECTIONS OF THE PROJECT SPECIFICATIONS MANUAL. OTHERWISE THIS WORK SHALL CONFORM TO THE STATE DEPARTMENT OF
28. THE CONTRACT LIMIT IS THE PROPERTY LINE UNLESS OTHERWISE SPECIFIED OR SHOWN ON THE CONTRACT DRAWINGS. TRANSPORTATION SPECIFICATIONS AND PROJECT GEOTECHNICAL REPORT IF THERE IS NO PROJECT SPECIFICATIONS MANUAL. ALL FILL MATERIAL UNDER STRUCTURES AND
PAVED AREAS SHALL BE PER THE ABOVE STATED APPLICABLE SPECIFICATIONS, AND/OR PROJECT GEOTECHNICAL REPORT, AND SHALL BE PLACED IN ACCORDANCE WITH THE
29. THE CONTRACTOR SHALL SUBMIT A SHOP DRAWING OF THE PAVEMENT MARKING PAINT MIXTURE PRIOR TO STRIPING. APPLICABLE SPECIFICATIONS UNDER THE SUPERVISION OF A QUALIFIED PROFESSIONAL ENGINEER. MATERIAL SHALL BE COMPACTED IN LIFT THICKNESSES PER THE PROJECT
GEOTECHNICAL REPORT TO 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D 1557 AT MOISTURE CONTENT INDICATED IN PROJECT GEOTECHNICAL REPORT.
30. PAVEMENT MARKING KEY:
80. ALL DISTURBANCE INCURRED TO MUNICIPAL, COUNTY, AND STATE PROPERTY DUE TO CONSTRUCTION SHALL BE RESTORED TO ITS PREVIOUS CONDITION OR BETTER, TO THE
4" SYDL 4" SOLID YELLOW DOUBLE LINE SATISFACTION OF THE MUNICIPALITY, COUNTY AND STATE AS APPLICABLE FOR THE LOCATION OF THE WORK.
4" SYL 4" SOLID YELLOW LINE
4" SWL 4" SOLID WHITE LINE 81. ALL CONSTRUCTION WITHIN A DOT RIGHT OF WAY SHALL COMPLY WITH ALL DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS.
12" SWSB 12" SOLID WHITE STOP BAR
4" BWL 4" BROKEN WHITE LINE 10' STRIPE 30' SPACE 82. THE UTILITY PLAN DETAILS SITE INSTALLED PIPES UP TO 5' FROM THE BUILDING FACE. REFER TO DRAWINGS BY WARE MALCOMB FOR BUILDING CONNECTIONS. SITE
CONTRACTOR SHALL SUPPLY AND INSTALL PIPE ADAPTERS AS NECESSARY AT BUILDING CONNECTION POINT OR AT EXISTING UTILITY OR PIPE CONNECTION POINT.
31. PARKING SPACES SHALL BE STRIPED WITH 4" SWL; HATCHED AREA SHALL BE STRIPED WITH 4" SWL AT A 45° ANGLE, 2' ON CENTER. HATCHING, SYMBOLS, AND STRIPING FOR
ADA ACCESSIBLE SPACES SHALL BE PAINTED WHOTE. OTHER MARKINGS SHALL BE PAINTED WHITE OR AS NOTED. 83. THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY THE ELEVATION AND LOCATION OF ALL UTILITIES BY VARIOUS MEANS PRIOR TO BEGINNING ANY EXCAVATION. TEST PITS
SHALL BE DUG AT ALL PROPOSED UTILITY CROSSINGS AND EARTHWORK OVER EXISTING UTILITIES TO REMAIN. TEST PITS SHALL BE USED TO DETERMINE THE HORIZONTAL
32. ALL NON-THERMOPLASTIC PAVEMENT MARKINGS SHALL HAVE TWO COATS APPLIED. PAVEMENT MARKINGS SHALL BE REFLECTIVE IN ACCORDANCE WITH STATEAND DOTVERTICAL LOCATIONS OF THE UTILITIES. THE CONTRACTOR SHALL CONTACT THE CIVIL ENGINEER IN THE EVENT OF ANY DISCOVERED OR UNFORESEEN CONFLICTS
SPECIFICATIONS. BETWEEN UTILITIES.
33. PAVEMENT MARKINGS SHALL BE HOT APPLIED TYPE IN ACCORDANCE WITH STATE DOT SPECIFICATIONS, UNLESS WHERE EPOXY RESIN PAVEMENT MARKINGS
84. ARE INDICATED.
UTILITY CONNECTION DESIGN AS REFLECTED ON THE PLAN MAY CHANGE SUBJECT TO UTILITY PROVIDER AND GOVERNING AUTHORITY STAFF REVIEW.
34. THE CONTRACTOR SHALL RESTORE ANY UTILITY STRUCTURE, DRAINAGE STRUCTURE, PIPE, UTILITY, PAVEMENT, CURBS, SIDEWALKS, LANDSCAPED AREAS,85.
SWALE, PAVEMENT SHALL ENSURE THAT ALL UTILITY PROVIDERS AND GOVERNING AUTHORITY STANDARDS FOR MATERIALS AND CONSTRUCTION METHODS ARE MET. THE
THE CONTRACTOR
CONTRACTOR
MARKINGS, OR SIGNAGE DISTURBED DURING DEMOLITION AND/OR CONSTRUCTION TO THEIR ORIGINAL CONDITION OR BETTER, AS APPROVED BY THE CIVIL ENGINEER, ANDSHALL PERFORM PROPER COORDINATION WITH THE RESPECTIVE UTILITY PROVIDER.
TO THE SATISFACTION OF THE OWNER AND THE MUNICIPALITY.
86. THE CONTRACTOR SHALL ARRANGE FOR AND COORDINATE WITH THE RESPECTIVE UTILITY PROVIDERS FOR SERVICE INSTALLATIONS AND CONNECTIONS. THE CONTRACTOR
Desc.
SHALL
35. EXISTING BOUNDARY AND TOPOGRAPHY IS BASED ON DRAWING TITLED "ALTA/NSPS LAND TITLE SURVEY"; SCALE 1"=40', DATED 11/15/2024, BY BL COMPANIES INC.COORDINATE WORK TO BE PERFORMED BY THE VARIOUS UTILITY PROVIDERS AND SHALL PAY ALL FEES FOR CONNECTIONS, DISCONNECTIONS, RELOCATIONS,
INSPECTIONS, AND DEMOLITION UNLESS OTHERWISE STATED IN THE PROJECT SPECIFICATIONS MANUAL AND/OR GENERAL CONDITIONS OF THE CONTRACT.
36. ALTERNATIVE METHODS AND PRODUCTS OTHER THAN THOSE SPECIFIED MAY BE USED IF REVIEWED AND APPROVED BY THE OWNER, CIVIL ENGINEER, AND APPROPRIATE
REGULATORY AGENCY PRIOR TO INSTALLATION DURING THE BIDDING PROCESS. 87. ALL EXISTING PAVEMENT WHERE UTILITY PIPING IS TO BE INSTALLED SHALL BE SAW CUT. AFTER UTILITY INSTALLATION IS COMPLETED, THE CONTRACTOR SHALL INSTALL
REVISIONS
TEMPORARY AND/OR PERMANENT PAVEMENT REPAIR AS DETAILED ON THE DRAWINGS OR AS REQUIRED BY THE OWNER HAVING JURISDICTION.
37. AN EROSION CONTROL BOND IS REQUIRED TO BE POSTED BY THE CONTRACTOR BEFORE THE START OF ANY ACTIVITY ON OR OFF SITE. THE AMOUNT OF THE EROSION
Date
CONTROL BOND WILL BE DETERMINED BY THE AUTHORITY HAVING JURISDICTION. 88. ALL PIPES SHALL BE LAID ON STRAIGHT ALIGNMENTS AND EVEN GRADES USING A PIPE LASER OR OTHER ACCURATE METHOD.
38. A DEMOLITION PERMIT IS REQUIRED FOR EXISTING BUILDINGS. 89. SANITARY LATERAL SHALL MAINTAIN (10' MIN. HORIZONTAL 1.5' VERTICAL MIN.) SEPARATION DISTANCE FROM WATER LINES, OR ADDITIONAL PROTECTION MEASURES WILL
No.
BE REQUIRED WHERE PERMITTED, WHICH SHALL INCLUDE CONCRETE ENCASEMENT OF PIPING UNLESS OTHERWISE DIRECTED BY THE UTILITY PROVIDERS AND CIVIL
39. NO PART OF THE PROJECT PARCEL IS LOCATED WITHIN ANY FEMA DESIGNATED FLOOD HAZARD AREAS. ENGINEER.
40. THERE ARE NO WETLANDS LOCATED ON THE SITE AS INDICATED BY BL COMPANIES MAPPING. 90. RELOCATION OF UTILITY PROVIDER FACILITIES SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE UTILITY PROVIDER.
Designed J.J.L.
41. FIRE LANES SHALL BE ESTABLISHED AND PROPERLY DESIGNATED IN ACCORDANCE WITH THE REQUIREMENTS OF THE FIRE DISTRICT FIRE MARSHAL. 91. THE CONTRACTOR SHALL COMPACT THE PIPE BACKFILL IN 8" LIFTS ACCORDING TO THE PIPE BEDDING DETAILS. TRENCH BOTTOM SHALL BE STABLE IN HIGH GROUNDWATER Drawn J.J.L.
AREAS. A PIPE FOUNDATION SHALL BE USED PER THE TRENCH DETAILS AND IN AREAS OF ROCK EXCAVATION.
42. THE CONTRACTOR SHALL REMOVE CONFLICTING PAVEMENT MARKINGS IN THE ROADWAY BY METHOD APPROVED BY THE AUTHORITY HAVING JURISDICTION OR DOT AS Reviewed K.A.K.
APPLICABLE FOR THE LOCATION OF THE WORK. 92. CONTRACTOR TO PROVIDE STEEL SLEEVES AND ANNULAR SPACE SAND FILL FOR UTILITY PIPE AND CONDUIT CONNECTIONS UNDER FOOTINGS. Scale 1"=30'
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\G2401824-01.DWG.G0.01 24X36.
43. ALL ADA DESIGNATED PARKING STALLS, ACCESS AISLES AND PEDESTRIAN WALKWAYS SHALL CONFORM TO THE CURRENT VERSION OF THE AMERICANS WITH
93. DISABILITIES
BUILDING UTILITY PENETRATIONS AND LOCATIONS ARE SHOWN FOR THE CONTRACTOR'S INFORMATION AND SHALL BE VERIFIED WITH THE BUILDING MEP, STRUCTURAL, AND Project No. 2401824
ACT STANDARDS FOR ACCESSIBLE DESIGN AND ANSI STANDARDS AND AS MAY BE SUPERCEDED BY THE STATE BUILDING CODE. ARCHITECTURAL DRAWINGS AND WITH THE OWNER'S CONSTRUCTION MANAGER. Date 07/17/2026
44. CONSTRUCTION OCCURRING ON THIS SITE SHALL COMPLY WITH NFPA 241 STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION 94.OPERATIONS,
ALL UTILITYAND
CONSTRUCTION IS SUBJECT TO INSPECTION FOR APPROVAL PRIOR TO BACKFILLING, IN ACCORDANCE WITH THE APPROPRIATE UTILITY PROVIDER REQUIREMENTS. CAD File:
CHAPTER 16 OF NFPA 1 UNIFORM FIRE CODE. G2401824-01
95. A ONE-FOOT MINIMUM VERTICAL CLEARANCE BETWEEN WATER, GAS, ELECTRICAL, AND TELEPHONE LINES AND STORM PIPING SHALL BE PROVIDED. A SIX-INCH MINIMUM
45. THE CONTRACTOR IS TO MAINTAIN FIRE DEPARTMENT ACCESS TO THE SITE AT ALL TIMES. CLEARANCE SHALL BE MAINTAINED BETWEEN STORM PIPING AND SANITARY SEWER WITH A CONCRETE ENCASEMENT. AN 18-INCH TO 6-INCH VERTICAL CLEARANCE BETWEEN Title
SANITARY SEWER PIPING AND STORM PIPING SHALL REQUIRE CONCRETE ENCASEMENT OF THE PROPOSED PIPING.
46. ALL BUILDINGS, INCLUDING FOUNDATION WALLS AND FOOTINGS AND BASEMENT SLABS INDICATED ON THE DEMOLITION PLAN ARE TO BE REMOVED FROM THE SITE.
CONTRACTOR SHALL SECURE ANY PERMITS, PAY ALL FEES AND PERFORM CLEARING AND GRUBBING AND DEBRIS REMOVAL PRIOR TO COMMENCEMENT OF 96.
GRADING
GRAVITY SANITARY SEWER PIPING AND PRESSURIZED WATERLINES SHALL BE LOCATED IN SEPARATE TRENCHES AT LEAST 10 FEET APART WHENEVER POSSIBLE. WHEN
GENERAL NOTES
OPERATIONS. INSTALLED IN THE SAME TRENCH, THE WATER PIPE SHALL BE LAID ON A TRENCH BENCH AT LEAST 18 INCHES ABOVE THE TOP OF THE SANITARY SEWER PIPE AND AT LEAST 12
INCHES (PREFERABLY 18 INCHES) FROM THE SIDE OF THE SANITARY SEWER PIPE TRENCH.
47. SEDIMENT AND EROSION CONTROLS AS SHOWN ON THE SEDIMENT AND EROSION CONTROL PLAN AND/OR DEMOLITION PLAN SHALL BE INSTALLED BY THE DEMOLITION
CONTRACTOR PRIOR TO START OF DEMOLITION AND CLEARING AND GRUBBING OPERATIONS. 97. SITE CONTRACTOR SHALL PROVIDE ALL BENDS, FITTINGS, ADAPTERS, ETC., AS REQUIRED FOR PIPE CONNECTIONS TO BUILDING STUB OUTS, INCLUDING ROOF/FOOTING
DRAIN CONNECTIONS TO ROOF LEADERS AND TO STORM DRAINAGE SYSTEM.
48. REMOVE AND DISPOSE OF ANY SIDEWALKS, FENCES, STAIRS, WALLS, DEBRIS AND RUBBISH REQUIRING REMOVAL FROM THE WORK AREA IN AN APPROVED OFF SITE LANDFILL,
BY AN APPROVED HAULER. HAULER SHALL COMPLY WITH ALL REGULATORY REQUIREMENTS. 98. MANHOLE RIMS AND CATCH BASIN GRATES SHALL BE SET TO ELEVATIONS SHOWN. SET ALL EXISTING MANHOLE RIMS AND VALVE COVERS TO BE RAISED OR LOWERED FLUSH Sheet No.
Xref (s): ; XB2401824-00
WITH FINAL GRADE AS NECESSARY.
49. THE CONTRACTOR SHALL SECURE ALL PERMITS FOR THE DEMOLITION AND DISPOSAL OF THE DEMOLITION MATERIAL TO BE REMOVED FROM THE SITE. THE CONTRACTOR
SHALL POST BONDS AND PAY PERMIT FEES AS REQUIRED. BUILDING DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE FOR PERMITS AND DISPOSAL OF 99.
DEMOLITION DEBRIS IN AN APPROVED OFF-SITE LANDFILL.
ALL BUILDING
SITE CONTRACTOR SHALL COORDINATE INSTALLATION OF CONDUIT AND CABLES FOR SITE LIGHTING WITH THE BUILDING ELECTRICAL CONTRACTOR.
100. CONTRACTOR SHALL COORDINATE INSTALLATION FOR ELECTRICAL SERVICES TO PYLON SIGNS AND SITE LIGHTING WITH THE BUILDING ELECTRICAL CONTRACTOR. ISSUED FOR PERMITTING G0.01
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1086 of 1174
Page 1087
Jul 08, 2026 3:15pm SCappelli G:\JOBS24\18\2401824\DWG\AL240182401.dwg
Layout: AL-1 24x36 50SC
LEGEND
MAP REFERENCE
SITE
LOCATION MAP
(Pu
blic
Rid- Var
geiable W
Roidth R
)
ad.O.W. Sla
(P d
ub
icl (H e
- arl
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
GENERAL NOTES
Va em Av
ria R en
ble oa
W d) ue
idt
hR
.O
.W
.)
2
3
(P u
l
bli c
a d
-V a r i
S
a
RO
b
T
N
EO
le
R o
51272
a
F N EW Y
TA ALD LEE LEW
d
e
OR
IS
e Av )
K
n
S (Harlem Width R
u
. O
e
. W . )
7/7/2026
7/8/2026
(Potter
O rchard Par
s Road)(Sta k Road
te Highway
(Public - Va No. 67)(NYS
riable Width Route No. 2
R.O.W.) 40)
Xref (s): ; XY240182401 ; XC2401824-10
REVISIONS
Title
Date
Scale
No. Date Desc.
Drawn
1 2/20/25 Updated Title Commitment
Surveyed
CAD File:
Reviewed
Architecture
Field Book
Project No.
2 3/3/25 Updated Per Client Comments
3 6/29/26 Updated Title Commitment COSTCO WHOLESALE FACILITY Engineering
Sheet No. 1 of 5
4 6/30/26 Updated Title Commitment Environmental
SURVEY
5 7/7/2026 Updated Per Comments
6 7/8/2026 Updated Title Commitment
SLADE AVENUE AND RIDGE ROAD Land Surveying
ALTA/NSPS
LAND TITLE
(203) 630-1406
Meriden, CT 06450
AL-1
WEST SENECA, ERIE COUNTY, NEW YORK
355 Research Parkway
AL240182401
DS
1"=100'
TF
BM, KKS
12/09/2024
-
2401824
Page 1087 of 1174
Page 1088
Jul 08, 2026 3:15pm SCappelli G:\JOBS24\18\2401824\DWG\AL240182401.dwg
Layout: AL-1 24x36 50SC (2)
(Pu
blic
Rid- Var
geiable W
Roidth R
)
ad.O.W.
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
LEGEND
MATCH LINE SHEET 2
MATCH LINE SHEET 3
Xref (s): ; XY240182401 ; XC2401824-10
REVISIONS
Title
Date
Scale
No. Date Desc.
Drawn
1 2/20/25 Updated Title Commitment
Surveyed
CAD File:
Reviewed
Architecture
Field Book
Project No.
2 3/3/25 Updated Per Client Comments
3 6/29/26 Updated Title Commitment COSTCO WHOLESALE FACILITY Engineering
Sheet No. 2 of 5
4 6/30/26 Updated Title Commitment Environmental
SURVEY
5 7/7/2026 Updated Per Comments
6 7/8/2026 Updated Title Commitment
SLADE AVENUE AND RIDGE ROAD Land Surveying
ALTA/NSPS
LAND TITLE
(203) 630-1406
Meriden, CT 06450
AL-1
WEST SENECA, ERIE COUNTY, NEW YORK
355 Research Parkway
AL240182401
1"=40'
DS
TF
BM, KKS
12/09/2024
-
2401824
Page 1088 of 1174
Page 1089
Jul 08, 2026 3:16pm SCappelli G:\JOBS24\18\2401824\DWG\AL240182401.dwg
Layout: AL-1 24x36 50SC (3)
LEGEND
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Sl
(P
ub
a d
lic (Ha e
- V rle A
ar m v
iab R e
le oad n
W ) u
idt
hR e
.O
.W
.)
MATCH LINE SHEET 2
MATCH LINE SHEET 3
Xref (s): ; XY240182401 ; XC2401824-10
REVISIONS
Title
Date
Scale
No. Date Desc.
Drawn
1 2/20/25 Updated Title Commitment
Surveyed
CAD File:
Reviewed
Architecture
Field Book
Project No.
2 3/3/25 Updated Per Client Comments
3 6/29/26 Updated Title Commitment COSTCO WHOLESALE FACILITY Engineering
Sheet No. 3 of 5
4 6/30/26 Updated Title Commitment Environmental
SURVEY
5 7/7/2026 Updated Per Comments
6 7/8/2026 Updated Title Commitment
SLADE AVENUE AND RIDGE ROAD Land Surveying
ALTA/NSPS
LAND TITLE
(203) 630-1406
Meriden, CT 06450
AL-1
WEST SENECA, ERIE COUNTY, NEW YORK
355 Research Parkway
AL240182401
1"=40'
DS
TF
BM, KKS
12/09/2024
-
2401824
Page 1089 of 1174
Page 1090
Jul 08, 2026 3:16pm SCappelli G:\JOBS24\18\2401824\DWG\AL240182401.dwg
Layout: AL-1 24x36 50SC (4)
SCHEDULE A DESCRIPTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
SURVEY RELATED EXCEPTIONS, SCHEDULE B, SECTION II:
Xref (s): ; XY240182401 ; XC2401824-10
REVISIONS
Title
Date
Scale
No. Date Desc.
Drawn
1 2/20/25 Updated Title Commitment
Surveyed
CAD File:
Reviewed
Architecture
Field Book
Project No.
2 3/3/25 Updated Per Client Comments
3 6/29/26 Updated Title Commitment COSTCO WHOLESALE FACILITY Engineering
Sheet No. 4 of 5
4 6/30/26 Updated Title Commitment Environmental
SURVEY
5 7/7/2026 Updated Per Comments
6 7/8/2026 Updated Title Commitment
SLADE AVENUE AND RIDGE ROAD Land Surveying
ALTA/NSPS
LAND TITLE
(203) 630-1406
Meriden, CT 06450
AL-1
WEST SENECA, ERIE COUNTY, NEW YORK
355 Research Parkway
AL240182401
DS
TF
BM, KKS
12/09/2024
-
2401824
Page 1090 of 1174
Page 1091
Jul 08, 2026 3:17pm SCappelli G:\JOBS24\18\2401824\DWG\AL240182401.dwg
Layout: AL-1 24x36 50SC (5)
LEGEND
(Pu
blic
Rid- Var
geiable W
Roidth R
)
ad.O.W.
Sl
(P ad
ubli
c - (Ha eA
Va rlem
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
ria R ve
ble oa n
W d) ue
idt
h R.
O.
W
.)
MATCH LINE SHEET 2
MATCH LINE SHEET 3
Xref (s): ; XY240182401 ; XC2401824-10
REVISIONS
Title
Date
Scale
No. Date Desc.
Drawn
1 2/20/25 Updated Title Commitment
Surveyed
CAD File:
Reviewed
Architecture
Field Book
Project No.
2 3/3/25 Updated Per Client Comments
3 6/29/26 Updated Title Commitment COSTCO WHOLESALE FACILITY Engineering
Sheet No. 5 of 5
4 6/30/26 Updated Title Commitment Environmental
SURVEY
5 7/7/2026 Updated Per Comments
6 7/8/2026 Updated Title Commitment
SLADE AVENUE AND RIDGE ROAD Land Surveying
ALTA/NSPS
LAND TITLE
(203) 630-1406
Meriden, CT 06450
AL-1
WEST SENECA, ERIE COUNTY, NEW YORK
355 Research Parkway
AL240182401
1"=40'
DS
TF
BM, KKS
12/09/2024
-
2401824
Page 1091 of 1174
Page 1092
Land Surveying
Environmental
STOP
Architecture
Engineering
ZONING INFORMATION
LOCATION: WEST SENECA, ERIE COUNTY, NEW YORK
ZONE: M-1 (MANUFACTURING) 610
605
USE: RETAIL (PERMITTED USE), WAREHOUSE (PERMITTED USE), GAS STATION (SPECIAL PERMIT USE)
ITEM REQUIREMENTS PROPOSED VARIANCE
787,828 S.F.
MINIMUM LOT AREA NONE REQUIRED NO
STOP
(18.08 AC.) 605
MINIMUM LOT WIDTH NONE REQUIRED 760 FEET NO
STOP
SHEET C1.01 SHEET C1.02
MINIMUM LOT FRONTAGE NONE REQUIRED 1,840 FEET NO
RESTAURANT 2,380 SF
25 FEET OR
605
355 Research Parkway
605
MINIMUM FRONT SETBACK 159 FEET NO FUTURE DRIVE-THRU
50 FEET WHEN OPPOSITE ANY R DISTRICT RETAIL
Meriden, CT 06450
MINIMUM SIDE SETBACK 10 FEET 45 FEET NO 2,925 G.S.F. (203) 630-1406
610
MINIMUM REAR SETBACK 10 FEET N/A NO 615
FUTURE
MAXIMUM BUILDING HEIGHT 40 FEET ±33 FEET NO STOP
615
615
615 615
MAXIMUM BUILDING COVERAGE NONE REQUIRED 24 PERCENT NO
615
615 615 615 615
615
615
615
PARKING INFORMATION 615
ITEM REQUIREMENTS PROPOSED VARIANCE
BUILDING SIZE NONE REQUIRED 187,050 S.F. NO
7/17/2026
RETAIL:
5 SPACES PER EVERY 1000 S.F. OF GROSS RESTAURANT 2,380 SF
FLOOR AREA (160,000 S.F.) = 800 SPACES FUTURE DRIVE-THRU
TIRE CENTER:
3 SPACES FOR EACH SERVICE BAY = 15 SPACES
WAREHOUSE:
PARKING REQUIRED 1 SPACE FOR EACH 1000 S.F. OF GROSS FLOOR 812 SPACES YES
AREA USED FOR SUCH PURPOSED, BUT SHALL
CAUTION
CAUTION
CAUTION
CAUTION
E
NOT BE LESS THAN 1 SPACE FOR EACH 2
EMPLOYEES AND NEED NOT BE MORE THAN 1
U
FOR EACH 1.5 EMPLOYEES (18,000 SF) =
18 SPACES
EN
TOTAL REQUIRED: 833
MINIMUM ADA PARKING SPACES REQUIRED 17 SPACES 17 SPACES NO
AV
COSTCO WHOLESALE
RETAIL:
E
WEST SENECA, NEW YORK
3 SPACES FOR GROSS FLOOR AREA OVER
D
50,000 S.F.
MINIMUM LOADING SPACES 5 SPACES NO
WAREHOUSE:
2 SPACES FOR GROSS FLOOR AREA UNDER
L A
SLADE AVENUE
40,000 S.F.
S
CAUTION
MINIMUM PARKING DIMENSIONS 9 FEET X 18 FEET 10 FEET X 20 FEET NO
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
MINIMUM AISLE WIDTH NONE REQUIRED 24 FEET - 2-WAY NO
MINIMUM FRONT SETBACK 10 FEET 10 FEET NO
MINIMUM SIDE SETBACK NONE REQUIRED 10 FEET NO
MINIMUM REAR SETBACK NONE REQUIRED 28 FEET NO
10' WIDE MEDIANS NOT PROVIDED BETWEEN
10' WIDE MEDIANS BETWEEN PARKING BLOCKS
EVERY PARKING BLOCK
DRIVE AISLES AND LANDSCAPED ISLANDS
MORE THAN 20 PARKING SPACES IN A ROW
SHALL BE INSTALLED SO THAT NOT MORE THAN
MINIMUM INTERIOR LANDSCAPING YES
20 PARKING SPACES IN A SINGLE ROW OR 40 IN WITHOUT INTERRUPTION
A DOUBLE ROW GO UNINTERRUPTED
FOR 812 PARKING SPACES, 82 SHADE TREES
1 SHADE TREE PER 10 PARKING SPACES ARE REQUIRED AND PROVIDED
10% OF REQUIRED VEHICLE PARKING
MINIMUM BICYCLE PARKING (MAXIMUM OF 20 BICYCLE SPACES) 20 SPACES NO
SIGN LEGEND
CAUTION
SIGN NO. MUTCD NO. LEGEND
RID
CAUTION
±18K S.F. MDO
A R1-1
STOP 30"
GE
VIOLATORS WILL
BE FINED
B R7-8 FFE = ±620.60
ROA
HANDICAPPED CAUTION
PARKING
158K PROTO
STATE PERMIT
REQUIRED
812 PARKING SPACES
CAUTION
VAN
D
C R7-8P ACCESSIBLE
SHEET C1.03 SHEET C1.04 DN
Desc.
DN
D R5-1
REVISIONS
DateNo.
E R3-8
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XO2401824-01 ; KM2401824-KeyMap
ONLY ONLY
Designed J.J.L.
7/17/2026, KKILGUSS, G:\JOBS24\18\2401824\DWG\C2401824-10.DWG.C1.00 24X36 60SC.
Drawn J.J.L.
NOTE: ALL HANDICAP ACCESSIBLE PARKING STALL SIGNAGE TO BE INSTALLED IN PIPE BOLLARDS (SEE Reviewed K.A.K.
DETAIL) AND BE IN FULL COMPLIANCE WITH THE LATEST BUILDING CODE. Scale 1"=60'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-10
Title
OVERALL SITE PLAN
Sheet No.
C1.00
GRAPHIC SCALE
ISSUED FOR PERMITTING 60 30 0 60
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1092 of 1174
Page 1093
Land Surveying
Environmental
SITE PLAN LEGEND
Architecture
Engineering
PROPERTY LINE
EASEMENT LINE
LIMIT OF DISTURBANCE AND SITEWORK CONTRACT
LIMIT LINE
SAWCUT LINE
PROVIDE AND INSTALL CONCRETE CURB AND GUTTER
PROVIDE AND INSTALL CONCRETE PAVEMENT
STRUCTURE, REINFORCED CONCRETE SIDEWALK, OR
MONOLITHIC CONCRETE CURB AND SIDEWALK
PROVIDE AND INSTALL FULL DEPTH HEAVY DUTY
BITUMINOUS CONCRETE PAVEMENT STRUCTURE 355 Research Parkway
Meriden, CT 06450
(203) 630-1406
PROVIDE AND INSTALL FULL DEPTH STANDARD
DUTY BITUMINOUS CONCRETE PAVEMENT
STRUCTURE
METAL BEAM GUIDERAIL RESTAURANT 2,380 SF
PROVIDE AND INSTALL SIGN FUTURE DRIVE-THRU
DEVELOPER'S OFFSITE IMPROVEMENTS 615
7/17/2026
PROVIDE AND INSTALL 5' WIDE
CONCRETE SIDEWALK TO STREET (TYP.)
PROPOSED
PROPERTY LINE
615
COSTCO WHOLESALE
9'
WEST SENECA, NEW YORK
PERMISSIBLE BUILD AREA
PER BK. 10872 PG. 9162
12' 20'
PROVIDE AND INSTALL FLUSH BITOUMINOUS
CONCRETE PAVEMENT WALK (TYP.)
SLADE AVENUE
PROVIDE AND INSTALL
OFFSITE RIGHT TURN LANE BY DEVELOPER ADA CURB RAMP (TYP.) 10'
(TYP.) 24'
PROVIDE AND INSTALL CURB & GUTTER (TYP.) PROVIDE AND INSTALL
PAINTED CROSSWALK (TYP.)
PROVIDE AND INSTALL 4" SWL. ALL STRIPING
SHALL HAVE 2 COATS OF PAINT (TYP.)
ALL RADII TO BE 3' UNLESS
PROVIDE AND INSTALL METAL OTHERWISE NOTED (TYP.)
BEAM GUIDERAIL (TYP.)
PROVIDE AND INSTALL LANDSCAPED ISLAND (TYP.)
20'
PROPERTY LINE SHALL BE LIMIT OF DISTURBANCE AND SITEWORK R=5
0'
24'
10
CONTRACT LIMIT LINE UNLESS OTHERWISE SHOWN (TYP.)
'
R=
PROVIDE AND INSTALL STANDARD
DUTY BITUMINOUS CONCRETE
PAVEMENT STRUCTURE (TYP.)
RELOCATE EXISTING UTILITY POLE. COORDINATION PROVIDE AND INSTALL LIGHT POLE,
FIXTURE, AND CONCRETE BASE.
CAUTION
WITH UTILITY PROVIDER REQUIRED.
CAUTION
REFER TO LIGHTING PLAN (TYP.)
'
R=30
PROVIDE AND INSTALL PAINTED
SHEET 1.01 SHEET 1.02 TRAFFIC ARROWS (TYP.)
PROVIDE AND INSTALL 4" SWL (TYP.)
SAWCUT LINE (TYP.)
LIMIT OF DISTURBANCE (TYP.)
OFFSITE IMPROVEMENTS
FOR RIGHT TURN LANE
CAUTION
CAUTION
CAUTION
CAUTION
R=100'
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
PROVIDE AND INSTALL
CART STORAGE AND ALL
CAUTION
UE R=55'
APPURTENANCES (TYP.)
R=
N
CAUTION
8
E
'
PROVIDE AND INSTALL HEAVY
V
CAUTION
CAUTION
DUTY BITUMINOUS CONCRETE
A
DN
13' PAVEMENT STRUCTURE (TYP.) 20'
DN
D E 10' FRONT PARKING
SETBACK (TYP.) '
Desc.
0
R=1
SHEET 1.03 SHEET 1.04
A
35' FRONT BUILDING
0'
R=1
L
SETBACK (TYP.)
SAWCUT (TYP.)
CAUTION
CAUTION
S
CAUTION
CAUTION
REVISIONS
MATCH EXISTING
Date
PAVEMENT
R=
KEY MAP
6'
No.
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XO2401824-01 ; KM2401824-KeyMap
R=105' 20' 20' 24' 20' 20'
PROVIDE AND INSTALL METAL 10'
BEAM GUIDERAIL (TYP.) Designed J.J.L.
Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-10.DWG.C1.01 24X36 30SC.
Reviewed K.A.K.
Scale 1"=30'
20' 30' 20' 20' 24' 20' 20' 24' Project No. 2401824
Date 07/17/2026
CAD File:
PROVIDE AND C2401824-10
INSTALL ACCESSIBLE PROVIDE AND
PARKING SPACES INSTALL FLUSH
BITIMOUNOUS Title
AND SIGNAGE (TYP.) WALK AT
ACCESSIBLE
PARKING (TYP.)
SITE PLAN
R=6'
LIMIT OF HEAVY DUTY BITUMINOUS PROVIDE AND INSTALL PROVIDE AND INSTALL DETECTABLE
CONCRETE PAVEMENT STRUCTURE (TYP.) PAINTED CROSSWALK (TYP.) WARNING PAD (TYP.) Sheet No.
30'
C1.01
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1093 of 1174
Page 1094
Land Surveying
Environmental
SITE PLAN LEGEND
Architecture
Engineering
PROPERTY LINE
EASEMENT LINE 610
LIMIT OF DISTURBANCE AND SITEWORK CONTRACT
LIMIT LINE 605
SAWCUT LINE
PROVIDE AND INSTALL CONCRETE CURB AND GUTTER
PROVIDE AND INSTALL CONCRETE PAVEMENT
STRUCTURE, REINFORCED CONCRETE SIDEWALK, OR
MONOLITHIC CONCRETE CURB AND SIDEWALK
PROVIDE AND INSTALL FULL DEPTH HEAVY DUTY
STOP
BITUMINOUS CONCRETE PAVEMENT STRUCTURE 605 355 Research Parkway
Meriden, CT 06450
(203) 630-1406
STOP
PROVIDE AND INSTALL FULL DEPTH STANDARD
DUTY BITUMINOUS CONCRETE PAVEMENT
STRUCTURE
METAL BEAM GUIDERAIL RESTAURANT 2,380 SF
605
605
PROVIDE AND INSTALL SIGN FUTURE DRIVE-THRU RETAIL
2,925 G.S.F. PROPOSED PROPERTY LINE
610 DEVELOPER'S PLAN BY OTHERS
DEVELOPER'S OFFSITE IMPROVEMENTS FUTURE
615 PROPERTY LINE SHALL BE LIMIT OF DISTURBANCE AND SITEWORK
CONTRACT LIMIT LINE UNLESS OTHERWISE SHOWN (TYP.)
MATCH PROPOSED CURB TO 7/17/2026
LIMIT OF FUEL AREA CANOPY, PROVIDE AND INSTALL PAINTED SPEED BUMP (TYP.)
DEVELOPER'S CURB (TYP.) REFER TO PLANS BY OTHERS
STOP 10' SIDE BUILDING SETBACK (TYP.)
615 CONCRETE PAVEMENT STRUCTURE, REFER TO PROVIDE AND INSTALL PAINTED ARROW, REFER
ARCHITECTURAL PLANS FOR DETAILS (TYP.)
615 TO ARCHITECTURAL PLANS FOR DETAILS (TYP.)
615 615 615
MATCH PROPOSED CURB TO
615 615 615 615
DEVELOPER'S CURB (TYP.)
615
PERMISSIBLE BUILD AREA
PER BK. 10872 PG. 9162
615
615
PROPOSED '
R=
20
PROPERTY LINE
615 50
R=
12'
24'
COSTCO WHOLESALE
R
'
=6
0'
WEST SENECA, NEW YORK
'
25
R=
R=
4 PROVIDE AND INSTALL
20' 37' SIGN AND POST (TYP.)
0'
11' 11'
=6'
PROVIDE AND INSTALL
R R= 12" SWSB (TYP.)
20' 8
SLADE AVENUE
'
R= 22' 15' 12'
10' PROVIDE AND INSTALL PAINTED
(TYP.) 24' PROVIDE AND INSTALL ALL RADII TO BE 3' UNLESS TRAFFIC ARROWS (TYP.)
CART STORAGE AND ALL OTHERWISE NOTED (TYP.)
APPURTENANCES (TYP.) PROVIDE AND INSTALL 4" SWL (TYP.)
R=
PROVIDE AND INSTALL 4" DSYL (TYP.)
15
145' R=5'
'
60'
R=5' PROVIDE AND INSTALL LIGHT POLE,
RESTAURANT 2,380 SF
FIXTURE, AND CONCRETE BASE.
REFER TO LIGHTING PLAN (TYP.)
FUTURE DRIVE-THRU
R=50'
PROVIDE AND INSTALL PAINTED
ISLAND, 4" SWL 2' O.C. AT 45° (TYP.)
10' SIDE BUILDING SETBACK (TYP.)
PROPOSED PROPERTY LINE
R=20
'
UNDERGROUND FUEL STORAGE TANKS
CAUTION
CAUTION
CAUTION
CAUTION
PAINTED ISLAND 4" SWL 2' O.C. AT 45°
R=5' LIMIT OF HEAVY DUTY BITUMINOUS
8' CONCRETE PAVEMENT STRUCTURE (TYP.)
R=
SHEET 1.01 SHEET 1.02 PROVIDE AND INSTALL STANDARD
30' DUTY BITUMINOUS CONCRETE
10' PAVEMENT STRUCTURE (TYP.)
R=10
'
(TYP.) R=8' 19'
23' PROVIDE AND INSTALL HEAVY
DUTY BITUMINOUS CONCRETE
PAVEMENT STRUCTURE (TYP.)
5'
4'
R=
CAUTION
CAUTION
CAUTION
CAUTION
FUEL STATION KIOSK,
REFER TO PLANS BY OTHERS
30'
PROVIDE AND INSTALL FUEL FACILITY TRANSFORMER, MOUNTABLE CONCRETE ISLAND
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
DEVELOPER'S PLAN BY OTHERS
CAUTION
CAUTION
CAUTION
CAUTION
CONCRETE PAD AND BOLLARDS (TYP.) FOR FUEL TRUCK PROTECTION
5'
R=
CAUTION
CAUTION
CAUTION
CAUTION
CROSS ACCESS AGREEMENTS MAY BE NEEDED FOR
ABUTTING PARKING SPACES AND INTERIOR MALL PARKING
DN
DN
PROVIDE AND INSTALL CURB & GUTTER (TYP.)
Desc.
20' 20' PROVIDE AND INSTALL 4" SWL. ALL STRIPING
SHEET 1.03 SHEET 1.04 SHALL HAVE 2 COATS OF PAINT (TYP.)
10'
(TYP.) PROVIDE AND INSTALL LANDSCAPED ISLAND (TYP.)
CAUTION
CAUTION
CAUTION
CAUTION
REVISIONS
CAUTION
CAUTION
Date
CAUTION
CAUTION
KEY MAP
No.
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XO2401824-01 ; KM2401824-KeyMap
20' 24' 20' 20' 24' 20' 20' 24' 20' 20' 30' 20' 20'
10' 10' 10' Designed J.J.L.
6'
30' 20' 24' 20' 20' 30' 20' 20' 24' 20' 20' 24' 40' 30' Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-10.DWG.C1.02 24X36 30SC.
Reviewed K.A.K.
12'
(TYP.) Scale 1"=30'
PROVIDE AND INSTALL 5 MDO SHIPPING TRUCK STALLS
Project No. 2401824
Date 07/17/2026
CAD File:
PROVIDE AND C2401824-10
INSTALL FLUSH
BITIMOUNOUS Title
WALK AT
ACCESSIBLE
PARKING (TYP.)
SITE PLAN
PROVIDE AND INSTALL CONCRETE
LANDSCAPE EDGING (TYP.)
R=1
5'
5'
R=
PROVIDE AND INSTALL DETECTABLE ALL RADII TO BE 3' UNLESS
WARNING PAD (TYP.) 596 PARKING SPACES OTHERWISE NOTED (TYP.) Sheet No.
C1.02
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1094 of 1174
Page 1095
Land Surveying
Environmental
SITE PLAN LEGEND R=105' 20' 20' 24' 20' 20'
Architecture
PROVIDE AND INSTALL METAL
Engineering
10'
BEAM GUIDERAIL (TYP.)
PROPERTY LINE
EASEMENT LINE 20' 30'
LIMIT OF DISTURBANCE AND SITEWORK CONTRACT 20' 20' 24' 20' 20' 24'
LIMIT LINE
SAWCUT LINE
PROVIDE AND
INSTALL ACCESSIBLE PROVIDE AND
PROVIDE AND INSTALL CONCRETE CURB AND GUTTER INSTALL FLUSH
PARKING SPACES
BITIMOUNOUS
AND SIGNAGE (TYP.) WALK AT
PROVIDE AND INSTALL CONCRETE PAVEMENT
STRUCTURE, REINFORCED CONCRETE SIDEWALK, OR ACCESSIBLE
MONOLITHIC CONCRETE CURB AND SIDEWALK PARKING (TYP.)
R=6'
PROVIDE AND INSTALL FULL DEPTH HEAVY DUTY
BITUMINOUS CONCRETE PAVEMENT STRUCTURE 355 Research Parkway
Meriden, CT 06450
LIMIT OF HEAVY DUTY BITUMINOUS PROVIDE AND INSTALL PROVIDE AND INSTALL DETECTABLE (203) 630-1406
CONCRETE PAVEMENT STRUCTURE (TYP.) PAINTED CROSSWALK (TYP.) WARNING PAD (TYP.)
PROVIDE AND INSTALL FULL DEPTH STANDARD 30' PROVIDE AND INSTALL 30'
DUTY BITUMINOUS CONCRETE PAVEMENT ACCESSIBLE PARKING PROVIDE AND INSTALL DETECTABLE
STRUCTURE 24'
SPACES AND SIGNAGE (TYP.) WARNING PAD (TYP.)
R=5' R=
METAL BEAM GUIDERAIL
5'
20'
'
PROVIDE AND INSTALL SIGN
R=10
13' 10'
'
32
20'
R=
R=5' 7/17/2026
10' 10'
ALL RADII TO BE 3' UNLESS TYP. TYP.
OTHERWISE NOTED (TYP.) PROVIDE AND INSTALL CART STORAGE 24'
AND ALL APPURTENANCES (TYP.)
5' CAUTION
R=
PROVIDE AND INSTALL
20' PAINTED CROSSWALK (TYP.)
20'
PROVIDE AND INSTALL CONCRETE
=5' LANDSCAPE EDGING (TYP.)
R
CAUTION
COSTCO WHOLESALE
PROVIDE AND INSTALL CURB & GUTTER (TYP.) 24'
WEST SENECA, NEW YORK
PROVIDE AND INSTALL 4" SWL. ALL STRIPING 5'
R=
SHALL HAVE 2 COATS OF PAINT (TYP.)
20'
SLADE AVENUE
PROVIDE AND INSTALL LANDSCAPED ISLAND (TYP.) 24' 10'
20'
20'
=5'
R
PROVIDE AND INSTALL LIGHT POLE, FIXTURE, AND LIMIT OF HEAVY DUTY BITUMINOUS
CONCRETE BASE. REFER TO LIGHTING PLAN (TYP.) CONCRETE PAVEMENT STRUCTURE (TYP.)
24'
216 PARKING SPACES PROVIDE AND INSTALL STANDARD
DUTY BITUMINOUS CONCRETE
PROPERTY LINE SHALL BE LIMIT OF DISTURBANCE AND SITEWORK 10' 5' CAUTION
PAVEMENT STRUCTURE (TYP.)
R=
CONTRACT LIMIT LINE UNLESS OTHERWISE SHOWN (TYP.) (TYP.) PROVIDE AND INSTALL HEAVY
10' FRONT PARKING SETBACK (TYP.) 20' DUTY BITUMINOUS CONCRETE
11' PAVEMENT STRUCTURE (TYP.)
35' FRONT BUILDING SETBACK (TYP.)
UTILITY POLE TO BE REMOVED . COORDINATION 20'
REQUIRED WITH UTILITY REQUIRED
R=
5' CAUTION
10'
RID
24' (TYP.)
PROVIDE AND INSTALL TIRE SERVICE CENTER
AIR COMPRESSOR PAD AND BOLLARDS.
5' REFER TO ARCHITECTURAL PLANS.
R=
SHEET 1.01 SHEET 1.02
20'
GE
10'
ROA
CAUTION
CAUTION
CAUTION
CAUTION
20'
=5'
R
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
24'
D
PROVIDE AND INSTALL BOLLARD
5' AT BUILDING CORNER. EXACT
CAUTION
R=
LOCATION OF BOLLARD TO BE
CAUTION
FIELD LOCATED TO ADEQUATELY
20'
CAUTION
PROTECT THE BUILDING (TYP.)
CAUTION
DN
DN
20'
Desc.
SHEET 1.03 SHEET 1.04
35'
REVISIONS
24'
=2
R
0'
Date
KEY MAP
No.
10' PROPOSED LIGHT POLE IN CLOSE PROXIMITY
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XO2401824-01 ; KM2401824-KeyMap
TO ELECTRICAL LINES. COORDINATION WITH
UTILITY PROVIDER REQUIRED. (TYP) Designed J.J.L.
Drawn J.J.L.
PERMISSIBLE BUILD AREA
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-10.DWG.C1.03 24X36 30SC.
PER BK. 10872 PG. 9162 Reviewed K.A.K.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
10' SIDE BUILDING SETBACK (TYP.)
CAD File:
C2401824-10
Title
SITE PLAN
Sheet No.
C1.03
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1095 of 1174
Page 1096
Land Surveying
Environmental
SITE PLAN LEGEND 20' 24' 20' 20' 24' 20' 20' 24' 20' 20' 30' 20' 20'
Architecture
Engineering
10' 10' 10'
6'
30' 20' 24' 20' 20' 30' 20' 20' 24' 20' 20' 24' 40' 30'
PROPERTY LINE
12'
EASEMENT LINE (TYP.)
PROVIDE AND INSTALL 5 MDO SHIPPING TRUCK STALLS
LIMIT OF DISTURBANCE AND SITEWORK CONTRACT
LIMIT LINE
SAWCUT LINE
PROVIDE AND
PROVIDE AND INSTALL CONCRETE CURB AND GUTTER INSTALL FLUSH
BITIMOUNOUS
PROVIDE AND INSTALL CONCRETE PAVEMENT WALK AT
STRUCTURE, REINFORCED CONCRETE SIDEWALK, OR ACCESSIBLE
MONOLITHIC CONCRETE CURB AND SIDEWALK PARKING (TYP.)
PROVIDE AND INSTALL CONCRETE
LANDSCAPE EDGING (TYP.)
R=1
PROVIDE AND INSTALL FULL DEPTH HEAVY DUTY
5'
BITUMINOUS CONCRETE PAVEMENT STRUCTURE 355 Research Parkway
5'
R=
ALL RADII TO BE 3' UNLESS Meriden, CT 06450
PROVIDE AND INSTALL DETECTABLE (203) 630-1406
WARNING PAD (TYP.) 596 PARKING SPACES OTHERWISE NOTED (TYP.)
PROVIDE AND INSTALL FULL DEPTH STANDARD 30' 30'
DUTY BITUMINOUS CONCRETE PAVEMENT
STRUCTURE 10'
(TYP.)
R=
METAL BEAM GUIDERAIL 29
'
20' PROVIDE AND INSTALL LIGHT POLE,
PROVIDE AND INSTALL SIGN
FIXTURE, AND CONCRETE BASE.
REFER TO LIGHTING PLAN (TYP.)
180'
PERMISSIBLE BUILD AREA
PER BK. 10872 PG. 9162
PROVIDE AND INSTALL BOLLARD AT RETAINING
WALL. EXACT LOCATION OF BOLLARDS TO BE FIELD
PROVIDE AND INSTALL
PROVIDE AND INSTALL BOLLARDS LOCATED TO ADEQUATELY PROTECT THE WALL (TYP.)
RUBBER WHEELSTOP (TYP.) 7/17/2026
AT GAS METER (TYP.) PROVIDE AND CONCRETE PAVEMENT STRUCTURE,
PROVIDE AND INSTALL CONCRETE PAVEMENT
STRUCTURE, SEE ARCHITECTURAL PROVIDE AND INSTALL PAINTED SEE STRUCTURAL PLANS FOR DETAIL (TYP.)
DRAWINGS FOR DETAILS ISLAND, 4" SWL 2' O.C. AT 45° (TYP.)
PROVIDE AND INSTALL CONCRETE TRANSFORMER
PROVIDE AND INSTALL BOLLARD AT STAIRS. EXACT PAD AND BOLLARDS IN ACCORDANCE WITH
LOCATION OF BOLLARDS TO BE FIELD LOCATED TO ELECTRIC COMPANY STANDARDS.
ADEQUATELY PROTECT THE WALL (TYP.)
EXISTING PROPERTY
LINE (TYP.)
DEVELOPER'S PLAN BY OTHERS
COSTCO WHOLESALE
10'
50'
±18K S.F. MDO
WEST SENECA, NEW YORK
SLADE AVENUE
FFE = ±620.60
158K PROTO 66'
PROPOSED PROPERTY LINE (TYP.)
812 PARKING SPACES
PROPERTY LINE SHALL BE LIMIT OF DISTURBANCE AND SITEWORK
CONTRACT LIMIT LINE UNLESS OTHERWISE SHOWN (TYP.)
10' SIDE BUILDING SETBACK (TYP.)
PROVIDE AND INSTALL TIRE SERVICE CENTER
SHEET 1.01 SHEET 1.02
DN
PROVIDE AND CONCRETE PAVEMENT STRUCTURE,
SEE STRUCTURAL PLANS FOR DETAIL (TYP.)
DN
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
PROVIDE AND INSTALL BOLLARDS AT
BUILDING CORNER (TYP. OF 3)
EXACT LOCATION OF BOLLARDS TO BE
FIELD LOCATED TO ADEQUATELY PROTECT
CAUTION
THE BUILDING CORNERS (TYP.)
CAUTION
PROVIDE AND INSTALL RETAINING
WALL. SEE STRUCTURAL DRAWINGS
CAUTION
FOR DETAILS. (TYP.)
CAUTION
110' PROVIDE AND INSTALL BOLLARD AT RETAINING
DN
DN
WALL. EXACT LOCATION OF BOLLARDS TO BE FIELD
LOCATED TO ADEQUATELY PROTECT THE WALL. SEE
STRUCTURAL DRAWINGS FOR DETAILS (TYP.)
Desc.
SHEET 1.03 SHEET 1.04
35'
45'
REVISIONS
'
R=45
Date
KEY MAP
No.
10'
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XO2401824-01 ; KM2401824-KeyMap
PROVIDE AND INSTALL CONVEX MIRROR
PROPOSED LIGHT POLE IN CLOSED PROXIMITY Designed J.J.L.
PERMISSIBLE BUILD AREA PROVIDE AND INSTALL HEAVY PROVIDE AND INSTALL CURB & GUTTER (TYP.) 10' SIDE BUILDING SETBACK (TYP.) TO ELECTRICAL LINES. COORDINATION WITH Drawn J.J.L.
PER BK. 10872 PG. 9162 DUTY BITUMINOUS CONCRETE UTILITY PROVIDER REQUIRED. (TYP)
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-10.DWG.C1.04 24X36 30SC.
Reviewed K.A.K.
PAVEMENT STRUCTURE (TYP.)
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-10
Title
SITE PLAN
Sheet No.
C1.04
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1096 of 1174
Page 1097
Land Surveying
Environmental
STOP
Architecture
Engineering
610
605
53
27.9
STOP
605
STOP
605
355 Research Parkway
605
Meriden, CT 06450
Max 68.5° Horiz
(203) 630-1406
610
23.5 Max 10° Vert
4 17.4 4.2 615
19.5 43.5 4 2.5
3 45.5
STOP
615
615
US - COSTCO - FUEL - MED 615
615 615
Overall Length 73.501ft 615 615
Overall Width 8.500ft 615 615
615
Overall Body Height 13.500ft
Min Body Ground Clearance 1.334ft US - COSTCO - FUEL - MED 615
615
Max Track Width 8.500ft
Lock-to-lock time 6.00s 615
Max Steering Angle (Virtual) 28.40°
7/17/2026
WB-67
US - COSTCO
Intersta -
te Sem
- FUEL - MED
i-Traile
r
53
27.9
CAUTION
CAUTION
CAUTION
CAUTION
Max 68.5° Horiz
U E
N
23.5 Max 10° Vert
E
4 17.4 4.2
19.5 43.5 4 2.5
V
3 45.5
A
WB-67 - Interstate Semi-Trailer
COSTCO WHOLESALE
Overall Length 73.501ft
Overall Width 8.500ft
E
WEST SENECA, NEW YORK
Overall Body Height 13.500ft
AD
Min Body Ground Clearance 1.334ft
Max Track Width 8.500ft
Lock-to-lock time 6.00s
Max Steering Angle (Virtual) 28.40°
L
SLADE AVENUE
S
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
37.5
3.545 22.83
US - COSTCO - MDO
US - COSTCO - MDO
Overall Length 37.500ft
Overall Width 8.500ft
Overall Body Height 13.500ft
CAUTION
WB-67 - Interstate Semi-Trailer
Min Body Ground Clearance 1.455ft
76-BW
76-BW
76-BW
76-BW
Track Width 8.500ft
Lock-to-lock time 6.00s
RID
Max Steering Angle (Virtual) 31.80° CAUTION
±18K S.F. MDO
GE
FFE = ±620.60
ROA
CAUTION
158K PROTO
812 PARKING SPACES
CAUTION
D
DN
Desc.
DN
US - COSTCO - MDO
REVISIONS
DateNo.
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XO2401824-01 ; KM2401824-KeyMap
Designed J.J.L.
Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-10.DWG.C1.20 24X36 60SC.
Reviewed K.A.K.
Scale 1"=60'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-10
Title
OVERALL TRUCK
TURNING PLAN
Sheet No.
C1.20
GRAPHIC SCALE
ISSUED FOR PERMITTING 60 30 0 60
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1097 of 1174
Page 1098
Land Surveying
Environmental
PAINT (2) COATS SAFETY YELLOW -
Architecture
Engineering
PAINT (2) COATS SAFETY YELLOW - 1'-0" RADIUS - TYP EXTEND FULL WIDTH OF CART CORRAL
3' - 0" RADIUS 1' - 0" RADIUS - 1'-0" RADIUS - TYP EXTEND FULL WIDTH OF CART CORRAL
CONFIRM DEPTH WITH CIVIL DRAWINGS CONFIRM DEPTH WITH CIVIL DRAWINGS
1'-0"
CONFIRM DEPTH WITH CIVIL DRAWINGS CONFIRM DEPTH WITH CIVIL DRAWINGS
TYPICAL TYPICAL
2'-0"
2'-0"
2' - 0"
TYPICAL
1'-0"
1'-6"
9'-6"
20'-0"(UNO)
CURB AT CURB AT GALV PIPE 4" WIDE
20'-0"(UNO)
ISLAND END END ISLAND 4" WIDE GALV PIPE RAILS - TYP PAINTED
20' - 0" 10' - 0"
(UNO)
4" WIDE PAINTED
6" HIGH CONCRETE CURB PAINTED RAILS - TYP LINES -
8' - 0" LINES -
LINES - SEE SPECS
SEE SPECS
EQ EQ SEE SPECS
STEP OFF WALK
9'-6"
CONCRETE SLAB - SLOPE AWAY WHERE SHOWN
FROM POLE BASE CART CORRAL
CART CORRAL ELEVATION
355 Research Parkway
EQ
ELEVATION
Meriden, CT 06450
8' - 0"
(203) 630-1406
CURB AT ISLAND
EQ WALK SURFACE
1'-8" 1'-8" 1'-0" 1'-0"
LIGHT POLE
BASE
1'-0" 8'-8" 8'-0"
20'-0"(UNO)
1'-0"
20'-0" (UNO)
1'-6" 1'-6" 1'-0" 1'-0" 1'-8" 8'-8" 1'-8"
8'-0" 12'-0"
20' - 0"
(UNO)
4" 4" (UNO)
TYPICAL
9'-0" 9'-0" 12'-0" 8'-0" 1'-0" 1'-0"
PLANTER AREA
16' - 0"
PLANTER TYP TYP
PER LANDSCAPING
AREA PER
4" WIDE PAINTED LINES -
LANDSCAPING
SEE SPECIFICATIONS RUBBER
RUBBER CART STOP
1' - 0" RADIUS / TYPICAL CART STOP
2'-0"
1'-0"
7/17/2026
2'-0"
10'-0" 10'-0" 10'-0"
3'-0" 3'-0" 10'-0" 10'-0" 9'-0" 10'-0" 10'-0" 10'-0" 10'-0"
(UNO) (UNO) (UNO)
(UNO) (UNO) (UNO) (UNO) (UNO) (UNO)
VARIES PER PLAN
ISLAND AT LIGHT POLE END ISLAND CURBS MIDDLE ISLAND AT CART CORRAL CART CORRAL & TYPICAL PARKING STALL
PAINT (2) COATS SAFETY
AT ISLAND AT LANDSCAPING
YELLOW - CENTER TEXT TO STALL
SLOPE SLOPE
HAND HOLE / COVER FIBERGLASS POLE - SEAT OVER STUB
ONLY
FIBERGLASS OR ALUMINUM STUB (DASHED)
COSTCO WHOLESALE
PARKING IDENTIFICATION LABEL (BY POLE MANUFACTURER)
TIRE EMBED IN CONCRETE AND PROJECT ABOVE BASE
WEST SENECA, NEW YORK
INFLATION INFLATION
PARKING FIBERGLASS OR NOTE:
TIRE ALUMINUM STUB - 4'-0"TO CENTERLINE INSERTION DEPTH AND INSTALLATION IS CORRECT
ONLY 524 NITROGEN AIR TOWER - OF LIGHT POLE
SEE A504 PROJECT ABOVE IF THE BOTTOM OF POLE IS RECESSED BELOW 3'-0"MIN
CONCRETE CONCRETE SURFACE AT LEAST 1/2" AND THE POLE
DRILL (1) 1/4" DIAMETER LIGHT POLE
IS A TIGHT FIT WITH THE FOUNDATION STUB
SLADE AVENUE
(UNO)
3'-6"
20'-0"
ASPHALT BASE
DIMENSION
WEEP HOLE THRU BOTH
CRITICAL
6" CONCRETE BASE TYP - FIBERGLASS SHAFT AND SEALANT ALL AROUND
2'-3"
FLUSH CONCRETE WITH MIN 4" ALUMINUM TUBE CENTERED 1" x 6" DEEP REVEAL WITH
1 3/4"
MIN
ADJOINING PAVEMENT CONCRETE
6"
NITROGEN AIR TOWER NON-SHRINK GROUT- FULL DEPTH -
FOR ASSISTANCE 1/2" PRE-MOULDED SEE LIGHT POLE INSTALLATION MANUAL
BOLLARD - TYP DURING BUSINESS
HOURS, SEE TIRE
JOINT FILLER CONCRETE
CENTER EMPLOYEE
AT MARKED
BAY DOOR
CHAMFER CURB
6"
EQ
11"
12" MIN (2) 3/8" DIA PLASTIC TUBE WEEPS
5'-4"
HEAVY DUTY WITH COTTON WICK - OPP SIDES
6" CONCRETE SLAB WITH PAVING
ACCESS BOX -
2'-6"
EQ
MEDIUM BROOM FINISH
PER ELECTRICAL SMOOTH FINISH EXPOSED CONCRETE -
11"
ELEVATION PAVING - PER CIVIL SLOPE 2% DO NOT PATCH AND SACK - NO SPIRAL
2'-0" 2'-0" 1-1/4" CONDUIT SWEEPS 1-1/4" CONDUITS FROM SEAMS OR VERTICAL MARKINGS ALLOWED
PER STRUCTURAL DRAWING
SIGNAGE ON
6"
WAREHOUSE BUILDING
BOLLARD (SOIC) 0'-10"
EQ EQ
MIN
10"
MIN CURB
(UNO)
20'-0"
CONDUIT STUBS UP MIN
17'-4"
6" ABOVE GRADE - TYP
#4 CONTINUOUS CURB FIBERGLASS OR ALUMINUM STUB
6"
NITROGEN AIR TOP AND BOTTOM PROFILE - (DASHED) 6'-7" LONG
UNDERGROUND GAS
TIRE AND POWER ROUTING - LOCATE CONDUITS TOWER - SEE A504 524 PER CIVIL CONCRETE BASE - SEE STRUCTURAL
WITHIN 4" X 6" AREA PLAN
INFLATION SEE ELECTRICAL SITE
PER AIR TOWER MFR
GROUND ROD - PER ELECTRICAL DRAWINGS FOR REINFORCING
LIGHTING PLAN
PARKING
ELECTRICAL CONDUIT - SEE
ONLY 2'-0"MIN ELECTRICAL DRAWINGS
PAINT (2) COATS
2'-0"
TYP
SAFETY YELLOW -
CENTER TEXT TO STALL LIGHT POLE LOCATION WHERE PARKING
TIRE INFLATION STATION NITROGEN AIR TOWER ENLARGED DETAIL LIGHT POLE BASE AT CONCRETE ISLAND/LANDSCAPING OCCURS
CLOSURE PLATE AT TOP OF POST
℄ SYM ABOUT SIGN AS NOTED BY GC
PARKING STALL DEPTH PARKING STALL 3/8" x 6" STAINLESS
STEEL THROUGH
1'-0" 9'-6" 9'-6" BOLT AND NUT
Xref (s): ; XB2401824-00 ; excavateddropinletprotection ; filterfabricdropinletprotection ; reinforcedsiltfence ; siltfence ; stabilizedconstructionaccess
3" SCHEDULE 40 HOT DIPPED GALVANIZED STEEL PIPE SOLID
1'-6"
GROUT WITH ROUNDED CONCRETE CAP - CENTER IN FOOTING
Desc.
7'-0" (UNO)
4'-0"
2" SCHEDULE 40 HOT DIPPED GALVANIZED STEEL PIPE RAILS - TYP 2" x 2" x 1/8" GALVANIZED
REVISIONS
1'-6"
SQUARE STEEL TUBE POST
1" CONCRETE WASH
Date
RUBBER CART STOP -
11"
No.
PAVING PER CIVIL
1-1/4" HIGH - SEE SPECS 1" SLOPE WASH
Designed J.J.L.
Drawn J.J.L.
3'-0"
Reviewed K.A.K.
2'-0"
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-110.DWG.C1.100 24X36.
CONCRETE Scale 1"=30'
Project No. 2401824
Date 07/17/2026
AGGREGATE BASE CAD File:
C2401824-110
1'-0"
1'-0"
DIA Title
1'-0" DIA
CONC FTG
SITE DETAILS
CART STORAGE SITE SIGNAGE POST Sheet No.
ISSUED FOR PERMITTING C1.100
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1098 of 1174
Page 1099
Land Surveying
Environmental
Architecture
Engineering
PLASTIC SLEEVE OVER
8" STEEL POST - FILL PLASTIC SLEEVE OVER
SOLID WITH CONCRETE 6" STEEL POST - FILL
SOLID WITH CONCRETE
NOTE:
SECURE PLASTIC NOTE:
SLEEVE TO STEEL POST SECURE PLASTIC
5'-0"
SLEEVE TO STEEL POST
4'-0"
1" CONCRETE WASH
1" CONCRETE WASH 8" EXTERIOR
PAVEMENT SECTION BOLLARD, TYP
PAVEMENT SECTION
1"
AGGREGATE BASE
1"
AGGREGATE BASE
EXTERIOR WALL 355 Research Parkway
Meriden, CT 06450
(203) 630-1406
BOLLARD AT BUILDING CORNER
4'-0"
4'-0"
3"
3"
EXTERIOR WALL
GAS SERVICE
7/17/2026
1'-0"
1'-2" DIA CONC FTG - TYP BOLLARD TYP
1'-6" DIA CONC AT FIRE 1'-0"DIA
6" 6"
HYDRANTS CONC FTG MIN MIN
5' - 0" 5' - 0"
5-FOOT TALL EXTERIOR BOLLARD TYPICAL EXTERIOR BOLLARD BOLLARDS AT TRANSFORMER MAX MAX
NOTES:
1. CONFIRM BOLLARD REQUIREMENT WITH UTILITY COMPANY.
2. ADDITIONAL BOLLARDS MAY BE REQUIRED TO PROTECT
THE ENTIRE GAS SERVICE ASSEMBLY
BUILDING
3'-0"MIN CLEAR
STRIPING AT HEAD OR OBJECT
OF ACCESSIBLE WHERE OCCURS
BOLLARD AT GAS SERVICE
COSTCO WHOLESALE
STALLS WHERE
ACCESSIBLE
3'-0" 6"
WEST SENECA, NEW YORK
OCCURS PER PLAN
ROUTE HEAVY DUTY ASPHALT
3' - 0" MIN
4'-0"
DUMMY JOINT WITH JOINT FILLER ACCESSIBLE FACE
6" ROUTE OF SIGN POST DENSOBAND
1/2" RADIUS 6" CONCRETE SLAB
SLADE AVENUE
PER PLAN 5'-0" MIN
CONT #5 TOP CONT #5 T & B DUMMY JOINT WITH WALK WIDTH:
JOINT FILLER
1'-0"
AND BOTTOM FACE OF SIGN PARKING 1-SIDE: 7'-0"
6"
POST PARKING 2-SIDE: 9'-0"
FACE OF WALL 6" CONCRETE SLAB
PAVING
PAVING WHERE OCCURS
SLOPE
3'-0"
CURB WHERE VEHICLE WHERE OCCURS
PAVEMENT
SIGN POST
OCCURS PER PLAN
2'-0"
2'-0"
WHERE OCCURS PER PLAN
1" DETAIL
SEE
FACE OF WHEEL STOP
1'-6"MIN
1'-6"MIN
PLAN
4"
#4 AT 18" OC
CLEAR
COMPACTED
6'-0" 6" AGGREGATE
3"
CLEAR
3'-0" #4 AT 18" OC
ELEVATION SECTION
#4 AT 18" OC
3"
NOTE:
8" 1. CENTER IN WIDTH OF PARKING STALL
2. PIN EACH END
3. SEE SPECS FOR MATERIAL AND ATTACHMENT 3'-0"
4. 3 NOS. OF FASTENERS
#4
AT 18" ON CENTER
EDGE OF SIDEWALK AT PAVEMENT WHEEL STOP FLUSH CURB AT PAVEMENT ACCESSIBLE PATH TO PUBLIC WAY
3'-0"
WHEN NOT MONOLITHICALLY
POURED PROVIDE #4 x 9" AT 12" OC DENSOBAND CONCRETE PAVEMENT
EMBED 3" IN CURB, 6" IN WALK.
2'- HEAVY-DUTY
Xref (s): ; XB2401824-00 ; excavateddropinletprotection ; filterfabricdropinletprotection ; reinforcedsiltfence ; siltfence ; stabilizedconstructionaccess
0" MINIMUM 4" CONCRETE ASPHALT PAVEMENT
SIDEWALK EDGE PER PLAN
MINIMUM 4" COMPACTED
Desc.
AGGREGATE BASE FUTURE SIDEWALK PER PLAN
6 1/2" 1'-0"
2" PRESSURE TREATED 2 X 2 X 24
1'-6" MIN
1" STAKE AT 4'-0" ON CENTER MAXIMUM
RADIUS CORNER,
REVISIONS
TYPICAL
CONTINUOUS PRESSURE TREATED 2 X 4
Date
ASPHALT PAVING (2) #4 REBARS
PAVING, PER CIVIL
PER PLAN
No.
Designed J.J.L.
Drawn J.J.L.
Reviewed K.A.K.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-110.DWG.C1.101 24X36.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-110
4" WIDE PAINTED LINE - WHITE UNLESS
NOTED OTHERWISE IN SPECS OR ON D WGS
Title
SITE DETAILS
PAINTED STRIPE CONCRETE LANDSCAPE EDGING ASPHALT TO CONCRETE PAVEMENT TEMPORARY EDGE OF PAVEMENT
NOTE: IF LANDSCAPING EDGING IS NOT POURED MONOLITHICALLY, THE TOP OF
CURB AND LANDSCAPING EDGING SHALL BE FLUSH WITH JOINT SEALED.
Sheet No.
ISSUED FOR PERMITTING C1.101
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1099 of 1174
Page 1100
Land Surveying
Environmental
Architecture
Engineering
ELECTRICAL EQUIPMENT OR TAP BOX ELECTRICAL EQUIPMENT OR TAP BOX
4"MAX 4"MAX
6" CONCRETE 6" CONCRETE
6"MIN
6"MIN
#4 at 18" OC #4 at 18" OC CONCRETE
EACH WAY PAVING - PER CIVIL EACH WAY PAVEMENT
PER CIVIL
#4 AT 18" OC
AT PERIMETER -
6" COMPACTED DRILL AND EPOXY
GRANULAR FILL INTO SLAB WITH 1/12" (0.083") SOFT CUT -
ADHESIVE - FILL JOINT SOLID WITH
2"
EMBED 4-1/2" JOINT FILLER WALL WHERE OCCURS TRANSITION CURB
1'-6" MIN
355 Research Parkway
6" CONCRETE SLAB SEALANT Meriden, CT 06450
(203) 630-1406
T/4
T
1/4"
26' - 0" x 1' - 0" WIDE
2
3"
1/4" PRE-MOLDED JOINT
FILLER - FULL DEPTH REFLECTORS PAINTED YELLOW STRIPES END CAPS
8"
A SHRINKAGE JOINT B ISOLATION JOINT ADHESIVE PER MFG
AT ASPHALT PAVEMENT AT CONCRETE PAVEMENT
7/17/2026
EXTERIOR EQUIPMENT PAD CONCRETE WALKS - JOINTS SPEED BUMP
RADIUS CORNERS - TYP
CONCRETE CURB BEYOND
1/2"
6" PLANTING AREA PER NOTE: ALL STEP OFF CURBS TO BE FLUSH TO CURB WHEN NOT MONOLITHICALLY
LANDSCAPE DRAWINGS
1 1/2"
POURED PROVIDE #4 x 9" AT 12" OC
NOTE:
EMBED 3" IN CURB -- 6" IN WALK
WHERE CURB AND GUTTER CROSSES
ACCESSIBLE WALKWAYS OR MINIMUM 4" CONCRETE
6"
CROSSWALKS - THE GUTTER PAN PAVING PER CIVIL
COSTCO WHOLESALE
SLOPE SHALL BE MODIFIED TO 2% MAX NOTE: 1'-6"
1'-0" 1" 6" EXTEND RADIUS REBARS INTO MINIMUM 4" COMPACTED
WEST SENECA, NEW YORK
STRAIGHT SECTION OF CURB AND WALK 6" AGGREGATE BASE
REVERSE SLOPE
RADIUS CORNER - TYP
(ALTERNATE CONDITION)
EQ EQ #4 BARS CONTINUOUS CURB AND GUTTER -
MIN
10"
6"
TOP AND BOTTOM
ASPHALT PAVING PER PLAN
SLADE AVENUE
5%MAX SLOPE ASPHALT PAVING PER PLAN
3"
NOTE:
WAREHOUSE IN WARM
8" MIN
CLIMATE LOCATIONS:
UPON OWNER APPROVAL,
CURB MAY BE MACHINE
FORMED WITHOUT REBAR
REINFORCEMENT
NOTE:
1/2" PRE-MOLD JOINT FILLER AT 25' ON CENTER (MAX)
CONTINUOUS (3) #4 REBAR AND AT START AND FINISH OF ALL CURVED SECTIONS
CONCRETE CURB AND GUTTER CAST-IN-PLACE CONCRETE CURB CURB AND GUTTER AT ISLAND END CURB AND GUTTER AT ISLAND WALK
WALK
1/12" (0.083") SOFT CUT - FILL JOINT
3/4" x 18" SQUARE DOWELS SOLID WITH JOINT FILLER LANDSCAPING HEAVY-DUTY
AT 24" OC MAX - CENTER IN
SLOPE ASPHALT
SLAB PER STRUCTURAL CONCRETE SLAB PER STRUCTURAL
SLAB THICKNESS (T)
DENSOBAND
PER STRUCTURAL
T/4
Xref (s): ; XB2401824-00 ; excavateddropinletprotection ; filterfabricdropinletprotection ; reinforcedsiltfence ; siltfence ; stabilizedconstructionaccess
B CONSTRUCTION JOINT
Desc.
WALK AT LANDSCAPE
REVISIONS
Date
BASKET ASSEMBLY 3/4"x14" 1/12" (0.083") SOFT CUT - FILL JOINT
ROUND DOWELS AT SOLID WITH JOINT FILLER
24" OC MAX - CENTER IN 10-'0" MAX 10'-0" MAX
No.
SLAB PER STRUCTURAL CONCRETE SLAB PER STRUCTURAL
T/4
STRUCTURAL
THICKNESS
Designed J.J.L.
2% CROSS SLOPE MAX.
WALL Drawn J.J.L.
SLAB
PER
WHERE OCCURS Reviewed K.A.K.
(T)
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-110.DWG.C1.102 24X36.
Scale 1"=30'
Project No. 2401824
MEDIUM SAW-CUT Date 07/17/2026
BROOM FINISH SHRINKAGE JOINT CAD File:
C2401824-110
Title
JOINT THROUGH AND 20'-0" MAXIMUM SITE DETAILS
FULL HEIGHT OF CURB
PLAN
A SHRINKAGE JOINT NOTE:
SEE STRUCTURAL FOR JOINT Sheet No.
LOCATION AND REINFORCING NOTE:
PROVIDE 6" CONCRETE WITH #4 AT 18" OC AT WALKS THAT CONNECTS TO:
DOCK AND COMPACTOR SLAB ONLY CONCRETE WALKS AT BUILDING
1. ENTRY SLAB (SEE A704)
2. STOOPS OR BUILDING
ISSUED FOR PERMITTING C1.102
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1100 of 1174
Page 1101
Land Surveying
Environmental
Architecture
Engineering
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
CROSSWALK MARKINGS 7/17/2026
TYPICAL ACCESSIBLE AND STANDARD PARKING SPACES
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
PLAN VIEW
DUMMY JOINT
PAVEMENT ARROW DETAILS SECTION A-A
CONCRETE SIDEWALK DETAIL HANDICAP SYMBOL
CLOSURE PLATE AT
TOP OF POST
Xref (s): ; XB2401824-00 ; excavateddropinletprotection ; filterfabricdropinletprotection ; reinforcedsiltfence ; siltfence ; stabilizedconstructionaccess
SIGN FACE
Desc.
STANDARD DUTY BITUMINOUS CONCRETE HEAVY DUTY BITUMINOUS CONCRETE 3/8" X 6" STAINLESS
REVISIONS
STEEL THROUGH BOLT
PAVEMENT STRUCTURE PAVEMENT STRUCTURE AND NUT
Date
7'-0" UNO
No.
2" X 2" X 1/8" GALVANIZED
SQUARE STEEL TUBE POST
Designed J.J.L.
1" SLOPE WASH
Drawn J.J.L.
Reviewed K.A.K.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-110.DWG.C1.103 24X36.
Scale 1"=30'
Project No. 2401824
07/17/2026
2' - 0"
Date
CAD File:
C2401824-110
CONCRETE Title
1' - 0"
DIA
SITE DETAILS
HANDICAP SIGN BOLLARD
DETAIL STOP SIGN Sheet No.
HEAVY DUTY CONCRETE PAVEMENT
CONCRETE SLAB MATCH AT ASPHALT PAVEMENT STRUCTURE ISSUED FOR PERMITTING C1.103
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1101 of 1174
Page 1102
Land Surveying
Environmental
Architecture
Engineering
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
7/17/2026
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
CURB RAMP
Xref (s): ; XB2401824-00 ; excavateddropinletprotection ; filterfabricdropinletprotection ; reinforcedsiltfence ; siltfence ; stabilizedconstructionaccess
Desc.
REVISIONS
DateNo.
Designed J.J.L.
Drawn J.J.L.
Reviewed K.A.K.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-110.DWG.C1.104 24X36.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-110
Title
SITE DETAILS
Sheet No.
METAL BEAM GUIDE RAIL
ISSUED FOR PERMITTING C1.104
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1102 of 1174
Page 1103
Land Surveying
Environmental
Architecture
Engineering
610
605
SHEET 2.02 605
SHEET 2.01 RESTAURANT 2,380 SF
605
355 Research Parkway
605
FUTURE DRIVE-THRU RETAIL
Meriden, CT 06450
2,925 G.S.F. (203) 630-1406
610
615
FUTURE
615
615
615 615 615
615 615 615 615
615
615
615
615
7/17/2026
RESTAURANT 2,380 SF
FUTURE DRIVE-THRU
CAUTION
CAUTION
CAUTION
CAUTION
U E
E N
AV
COSTCO WHOLESALE
E
WEST SENECA, NEW YORK
AD
L
SLADE AVENUE
S
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
RID
CAUTION
±18K S.F. MDO
GE
FFE = ±620.60
R
CAUTION
158K PROTO
OAD
812 PARKING SPACES
CAUTION
SHEET 2.03 SHEET 2.04 DN
Desc.
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XO2401824-01 ; KM2401824-KeyMap
DN
REVISIONS
DateNo.
Designed J.J.L.
Drawn J.J.L.
ED UPON FURTHER
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-20.DWG.C2.00 24X36 60SC.
Reviewed K.A.K.
Scale 1"=60'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-20
Title
OVERALL GRADING
PLAN
Sheet No.
C2.00
GRAPHIC SCALE
ISSUED FOR PERMITTING 60 30 0 60
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1103 of 1174
Page 1104
Land Surveying
Environmental
Architecture
Engineering
GRADING LEGEND
PROPERTY LINE
LIMIT OF DISTURBANCE
SAWCUT LINE
150 PROPOSED CONTOUR LINE
60 EXISTING CONTOUR LINE
100.00 PROPOSED SPOT GRADE
SPOT GRADE ABBREVIATIONS
BC BOTTOM OF CURB 355 Research Parkway
TC TOP OF CURB Meriden, CT 06450
BW BOTTOM OF WALL (203) 630-1406
TW TOP OF WALL
MEX MEET EXISTING CONDITION
RESTAURANT 2,380 SF
FUTURE DRIVE-THRU
615
7/17/2026
TC ???
BC ??? TC ???
??? BC ???
618 615
COSTCO WHOLESALE
617.12 617.29
TC 617.24
BC 616.74
WEST SENECA, NEW YORK
TC 617.24 TC 617.20 TC 616.86
BC 616.74 BC 616.70 BC 616.36 TC 617.00
BC 616.50
TC 617.03
SLADE AVENUE
BC 616.53 616.18
616.51
TC 617.55
BC 617.05 616.04 TC 616.80
618
616.01 TC 617.10 BC 616.30
11.14% BC 616.60 TC 616.73
TC 616.59 BC 616.23
BC 616.09
TC 616.77
619
BC 616.27
TC 616.95 TC 616.90
BC 616.45 BC 616.40
620
TC 616.73
BC 616.23
TC 617.61
TC 617.70
621
BC 617.11
BC 617.20
622
617
623
618
617
CAUTION
625
CAUTION
TC 617.95
4
62
BC 617.45
5
62
SHEET 2.01 SHEET 2.02 6
62
TC 618.65 TC 618.37 TC 618.11
626
BC 618.15 BC 617.87 BC 617.61
TC 618.20
617.52 BC 617.70 617.70
CAUTION
CAUTION
CAUTION
CAUTION
TC 618.39 617.61
618.65 TC 618.30 TC 618.40
618
BC 617.89
619
CAUTION
625
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
BC 617.90
CAUTION
CAUTION
CAUTION
CAUTION
BC 617.80
TC 618.37
7
TC 618.29
E
BC 617.87
62
6
25
62
6 BC 617.79
4
U 62 TC 618.37
620
CAUTION
TC 619.68
BC 617.87
N
7.1
CAUTION
TC 621.01 BC 619.18 TC 618.38
3
62
1%
E
BC 620.51 BC 617.88
618
V
CAUTION
CAUTION
622 TC 618.48 TC 618.50
A
DN BC 617.98 BC 618.00
TC 619.47
DN
1
62
E
BC 618.97 TC 618.30
620 BC 617.80
D
Desc.
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XO2401824-01 ; KM2401824-KeyMap
SHEET 2.03 SHEET 2.04
LA 620.17
CAUTION
CAUTION
S
CAUTION
CAUTION
%
.75
REVISIONS
0
Date
620 TC 620.40
KEY MAP BC 619.90
628
TC 621.05 TC 620.01
627
No.
628.59 BC 620.55 620.37 BC 619.51
6
62
5
62
4
62
3
628.66 62 2 TC 620.48 TC 620.86 618.88
62 1 BC 619.98 BC 620.36 618.92 Designed J.J.L.
62 0 TC 619.67
62 BC 619.17 618.82 Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-20.DWG.C2.01 24X36 30SC.
TC 620.74 Reviewed K.A.K.
619 BC 620.24 618.88 Scale 1"=30'
61
619
9
Project No. 2401824
TC 618.74 620 TC 620.64
BC 618.24 BC 620.14 Date 07/17/2026
619.17 619.21
619.13 619.30 CAD File:
619.86 TC 620.04 C2401824-20
619
BC 619.54 TC 620.01
620 619.29 BC 619.51 Title
TC 620.20 619.32 TC 620.10
TC 620.08 TC 620.07
BC 619.58 BC 619.70 BC 619.57
TC 620.04
BC 619.54 619.50
BC 619.60
GRADING PLAN
TC 619.96 TC 619.99 TC 619.99
BC 619.49 619.44 619.47
BC 619.46 620 BC 619.49 620
TC 620.00 TC 619.99
TC 619.86 TC 620.08 BC 619.50 BC 619.49
BC 619.36 619.19 620 620 620
TC 620.15 BC 619.58
620
619.41 TC 620.15 TC 620.03
TC 619.85 BC 619.65 TC 620.15 TC 619.99 TC 620.15 TC 620.20
Sheet No.
BC 619.35 BC 619.65 BC 619.49 BC 619.65 BC 619.65 BC 619.53 BC 619.70
C2.01
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1104 of 1174
Page 1105
Land Surveying
Environmental
Architecture
Engineering
GRADING LEGEND
PROPERTY LINE
LIMIT OF DISTURBANCE 610
605
SAWCUT LINE
150 PROPOSED CONTOUR LINE
60 EXISTING CONTOUR LINE
100.00 PROPOSED SPOT GRADE
SPOT GRADE ABBREVIATIONS
BC BOTTOM OF CURB 605 355 Research Parkway
TC TOP OF CURB Meriden, CT 06450
BW BOTTOM OF WALL (203) 630-1406
TW TOP OF WALL
MEX MEET EXISTING CONDITION
RESTAURANT 2,380 SF
605
605
FUTURE DRIVE-THRU RETAIL
2,925 G.S.F.
610
615
FUTURE
7/17/2026
615
615
615 615 615
615 615 615 615
615 TC 615.70
TC ??? BC 615.20
TC ??? BC ??? TC ???
TC 617.12 BC ???
BC ??? BC 616.62 615
615
615 615
618 616
2.95%
615 LOCATION OF CONCRETE DRAINAGE CHANNEL
TC 616.60 616
TO COLLECT ALL FUEL PAD RUNOFF
COSTCO WHOLESALE
617.29
617 BC 616.10
TC 616.85 TC 615.86
WEST SENECA, NEW YORK
TC 615.95 BC 615.36 FURTHER COORDINATION REQUIRED
TC 617.20 TC 616.86 TC 616.78 BC 615.45 TC 616.15 BC 616.35
TC 616.99 TC 615.95 WITH DEVELOPER FOR GRADING AT
BC 616.70 BC 616.36 TC 617.00 BC 616.28 615.64 BC 615.65 ADJACENT PARCEL
BC 616.49 BC 615.45
BC 616.50 TC 616.81 TC 616.18
TC 617.15 BC 616.31 BC 615.68
BC 616.65
SLADE AVENUE
616.18 TC 616.20
616.51 615.96 616.29 BC 615.70 TC 615.89
616.56 BC 615.39
616.04 TC 616.80 TC 617.03 TC 615.27 TC 615.57
615.96 BC 616.53 TC 616.86 615.61 615.61 615.26 BC 614.77
6
TC 617.10 BC 616.30 BC 615.07
61
BC 616.36
BC 616.60 TC 616.73 TC 616.76 TC 616.54
BC 616.23 BC 616.26 BC 616.04
TC 616.77 TC 616.85 TC 616.66
BC 616.27 BC 616.35 BC 616.16 61 RESTAURANT 2,380 SF
6
6
61
TC 616.95
0.
TC 616.90 TC 617.06 TC 616.87 TC 616.93
99
BC 616.45 BC 616.56 BC 616.37 BC 616.43
FUTURE DRIVE-THRU
%
BC 616.40 TC 616.48
BC 615.98 TC 615.54
TC 616.73
BC 616.23 BC 615.04
TC 616.69
BC 616.19
TC 617.64
7
61
TC 617.04 BC 617.14
BC 616.54 TC 617.27
617
CAUTION
CAUTION
CAUTION
616.49
CAUTION
617 BC 616.77 TC 616.92
TC 617.19 TC 617.88 BC 616.42
TC 617.16 BC 616.69 BC 617.38 TC 616.19
BC 616.66 BC 615.69
TC 617.05
SHEET 2.01 SHEET 2.02 617 BC 616.55
TC 617.61 TC 617.19 TC 616.97
61
7 TC 617.48 2% TC 617.19
TC 618.11
BC 616.98
BC 617.11 BC 616.69 BC 616.47 0.9 BC 616.69
BC 617.61
617.31 TC 617.20 TC 617.20 TC 617.42
617 2%
TC 618.20 BC 616.70 BC 616.70 BC 616.92 TC 617.56 0.9 616.39
BC 617.70 617.17 TC 618.19 BC 617.06 616.60
617.70 617.44 617.30
CAUTION
CAUTION
CAUTION
CAUTION
BC 617.69 TC 617.55 616.43
%
TC 617.14
1.81
BC 617.05 BC 616.64 TC 617.14
TC 618.39 617.61 TC 618.27 TC 618.07 617.15 616.56 BC 616.64 TC 617.37
TC 618.40 TC 618.04 617 BC 616.87
BC 617.89 BC 617.77 BC 617.57 TC 618.10 TC 617.41
CAUTION
CAUTION
CAUTION
TC 617.23
CAUTION
CAUTION
CAUTION
BC 617.90
CAUTION
CAUTION
CAUTION
BC 617.54
CAUTION
TC 617.04 TC 617.41 BC 616.91
TC 617.92 BC 617.60 BC 616.73 BC 616.91
TC 618.37 TC 617.92 BC 616.54 616.66 616.63
BC 617.87 BC 617.42 BC 617.42
TC 617.00
TC 618.19 TC 617.19 BC 616.50
TC 618.37 TC 617.91 BC 616.69 TC 617.06 TC 617.13 TC 617.13
CAUTION
BC 617.87 TC 618.12 BC 617.41 BC 617.69 BC 616.56 BC 616.63 BC 616.63
TC 618.09
BC 617.62 TC 617.19
CAUTION
BC 617.59 TC 617.31
BC 616.81 BC 616.69
618 TC 618.31 TC 618.16 TC 618.40 616.30 616.65 616.10
BC 617.90 616.67
CAUTION
TC 618.48 TC 618.50 BC 617.81 TC 618.14 BC 617.66 616.30 TC 617.18 TC 617.25 616.33 616.51
CAUTION
616.30
617
BC 617.98 BC 618.00 BC 617.64 BC 616.68 BC 616.75 TC 617.29
TC 617.15 TC 617.18
DN
615.95
DN
BC 616.65 BC 616.79 BC 616.68
TC 618.30 616.65 616.65
TC 618.23
BC 617.80 BC 617.73
Desc.
618
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XO2401824-01 ; KM2401824-KeyMap
SHEET 2.03 SHEET 2.04
CAUTION
CAUTION
61
CAUTION
CAUTION
61
REVISIONS
7
CAUTION
7
CAUTION
61
7
Date
CAUTION
CAUTION
61
KEY MAP
9
619
61
No.
61
7
8
618.88
618.92 Designed J.J.L.
Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-20.DWG.C2.02 24X36 30SC.
Reviewed K.A.K.
618.88 Scale 1"=30'
619 Project No. 2401824
TC 619.62 Date 07/17/2026
619.17 619.21 619 BC 619.12 61
619.30 CAD File:
8 C2401824-20
TC 620.04 61
BC 619.54 TC 620.01 TC 620.24 61 8
9 61
BC 619.51 BC 619.74 8 Title
TC 619.86
619
619.32 TC 620.10 TC 620.24 620
BC 619.74 TC 620.08 BC 619.36
619.50
BC 619.60 TC 620.01
BC 619.51 BC 619.58 TC 620.01 TC 619.11 GRADING PLAN
TC 620.02 BC 619.51 BC 618.61
619.47 BC 619.52 618.59
TC 620.07 620 TC 619.85 618.47
TC 619.99 BC 619.57 620 BC 619.35 618.39 618.39 618.39 618.71
BC 619.49 TC 619.92
620 620 TC 620.08 620 BC 619.42 618.42
BC 619.58 TC 620.11 TC 619.09 618.71 618.72
TC 620.15 TC 620.03 TC 620.20 TC 620.38 TC 620.20 618.71
BC 619.65 BC 619.53 BC 619.70 BC 619.61 BC 618.59 Sheet No.
BC 619.70 BC 619.88
C2.02
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1105 of 1174
Page 1106
Land Surveying
4
Environmental
62
3
62 2 TC 620.48 TC 620.86 618.88
628.66 62
Architecture
Engineering
GRADING LEGEND
1 BC 619.98 BC 620.36 618.92
62 0 TC 619.67
62 BC 619.17 618.82
PROPERTY LINE TC 620.74
619 BC 620.24 618.88
61
619
9
LIMIT OF DISTURBANCE
TC 618.74 620 TC 620.64
BC 618.24 BC 620.14
SAWCUT LINE 619.17 619.21
619.13 619.30
619.86 TC 620.04
619
150 PROPOSED CONTOUR LINE BC 619.54 TC 620.01
620 619.29 BC 619.51
619.32 TC 620.10
60 EXISTING CONTOUR LINE TC 620.08 TC 620.20 TC 620.07 BC 619.60
BC 619.70 TC 620.04
BC 619.58 BC 619.57 BC 619.54 619.50
100.00 PROPOSED SPOT GRADE TC 619.96 TC 619.99 TC 619.99 619.47
BC 619.46 BC 619.49 BC 619.49 619.44
SPOT GRADE ABBREVIATIONS 620 620
TC 620.00 TC 619.99
BC BOTTOM OF CURB TC 619.86 TC 620.08 BC 619.50 BC 619.49 355 Research Parkway
BC 619.36 619.19 620 620 620
TC TOP OF CURB TC 620.15 BC 619.58 Meriden, CT 06450
620
619.41 TC 620.15 TC 620.15 TC 620.03 TC 620.20
BW BOTTOM OF WALL TC 619.85 TC 620.15 TC 619.99 (203) 630-1406
BC 619.65 BC 619.65 BC 619.53
BC 619.35 BC 619.65 BC 619.49 BC 619.65 BC 619.70
TW TOP OF WALL 619.68
MEX MEET EXISTING CONDITION TC 621.27 619.57 619.63
BC 620.77 TC 620.38
619.82 BC 619.88
619.60
TC 620.76 620.35
TC 621.03 BC 620.26
BC 620.53
619.62 619.86
TC 621.33
BC 620.83 TC 620.61
BC 620.11 TC 619.87
BC 619.37 620.28 620.27 620.27
620.27 620.27 7/17/2026
620.30 620.58
0
619.41 619.71 62
620.00
618.70 TC 620.28
BC 619.78
TC 620.95 9 CAUTION
61
BC 620.45
620.32
TC 621.07 620.50
BC 620.57
TC 620.70
BC 620.20 TC 620.80 620.34
BC 620.30
620.60
CAUTION
0 620.50
62 618.63
COSTCO WHOLESALE
WEST SENECA, NEW YORK
620.49
TC 620.89
SLADE AVENUE
BC 620.39
TC 619.99
BC 619.49 TC 620.80
BC 620.30
TC 620.55
BC 620.05
620.30
620
9
61
61
9
618.70
CAUTION
TC 620.05
BC 619.55 620.35
TC 619.75 TC 620.78
BC 619.25 BC 620.28
CAUTION
618.66
RID
SHEET 2.01 SHEET 2.02
GE
TC 620.18
BC 619.68
TC 619.76
BC 619.26 TC 620.80
TC 619.76 BC 620.30
ROA
BC 619.26
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
TC 620.25
BC 619.75 620.58
D
618.86
620
CAUTION
620.57
CAUTION
CAUTION
CAUTION
620.58 620.58 619.93
TC 620.13
TC 620.04 TC 620.78
DN
DN
BC 619.63
BC 619.54 BC 620.28
620.40
Desc.
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XO2401824-01 ; KM2401824-KeyMap
SHEET 2.03 619.61
SHEET 2.04 TC 620.42
BC 619.92 619.23
62
0
REVISIONS
62 0
619.84 0 62
Date
TC 620.16
KEY MAP BC 619.66
No.
TC 620.78 TC 620.52 TC 621.08 TC 620.41
BC 620.28 BC 620.02 BC 620.58 BC 619.91
Designed J.J.L.
Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-20.DWG.C2.03 24X36 30SC.
Reviewed K.A.K.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-20
Title
GRADING PLAN
Sheet No.
C2.03
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1106 of 1174
Page 1107
Land Surveying
Environmental
618.88
Architecture
Engineering
GRADING LEGEND 618.92
PROPERTY LINE 618.88
LIMIT OF DISTURBANCE 619
TC 619.62
SAWCUT LINE 619.17 619.21 619 BC 619.12 61
619.30 8
TC 620.04 61
150 PROPOSED CONTOUR LINE BC 619.54 TC 620.01 TC 620.24 61 8
9 61
BC 619.51 BC 619.74 8
TC 619.86
619
619.32 TC 620.10 TC 620.24
60 EXISTING CONTOUR LINE BC 619.60 BC 619.74
620
TC 620.08 BC 619.36
TC 620.01 TC 620.01 TC 619.11
619.50 BC 619.51 BC 619.58
100.00 PROPOSED SPOT GRADE TC 620.02 BC 619.51 BC 618.61
619.47 BC 619.52 618.59
SPOT GRADE ABBREVIATIONS TC 620.07 620 TC 619.85 618.47
TC 619.99 BC 619.57 620 BC 619.35 618.39 618.39 618.39 618.71
BC BOTTOM OF CURB BC 619.49 TC 619.92 355 Research Parkway
620 620 TC 620.08 620 618.42
TC TOP OF CURB BC 619.58 TC 620.20
BC 619.42
TC 620.11 TC 619.09 618.71 618.72 Meriden, CT 06450
TC 620.15 TC 620.03 TC 620.20 TC 620.38 618.71 (203) 630-1406
BW BOTTOM OF WALL BC 619.65 BC 619.53 BC 619.70 BC 619.88 BC 619.70 BC 619.61 BC 618.59
TW TOP OF WALL
MEX MEET EXISTING CONDITION
618.39
618.15
62
618.67
0
620.35
618.39
618
1.46% 617.89 TC 618.65
618.52 BC 618.15
620.27 620.27 620.60
620.58 620.58
620.27 620.27 7/17/2026
620.58
619
617
61
9
620
619.43
616.43 616.43
619.91
620.44
620.58
COSTCO WHOLESALE
±18K S.F. MDO
WEST SENECA, NEW YORK
620.60
SLADE AVENUE
620.60
619.91
620.60
TC 620.10
BC 619.60
FFE = ±620.60 620
158K PROTO
TC 620.60
BC 620.10
620.38
812 PARKING SPACES 620.60
620.55 TC 620.00
BC 619.50
SHEET 2.01 SHEET 2.02
620.36
0
62
DN
616.43 616.47
DN
619
CAUTION
CAUTION
CAUTION
CAUTION
617.51
618
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
616.77 616.50
617
CAUTION
617.15 617
617.17
CAUTION
AREA OF GRADE TRANSITION
CAUTION
617.11 617 616.96
619.93 620.58 620.30 620.58 620.14 620.58 620.08 617.54
CAUTION
DN
DN
620.58 617.30
617.32
FURTHER COORDINATION REQUIRED
617.45 WITH DEVELOPER FOR GRADING AT
618
619
620
620.42 620.10 620.49 620.00 620.42 619.76 617.42
Desc.
616.78 617.31 ADJACENT PARCEL
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XO2401824-01 ; KM2401824-KeyMap
SHEET 2.03 619.61
SHEET 2.04 617
9.43% 617.16 TC 618.65
BC 618.15 8
REVISIONS
62 0 0 620.42 61
0 62 62
Date
KEY MAP
No.
TC 620.41 TC 621.08 TC 620.75 TC 621.15 TC 620.66 TC 621.15 TC 620.50 TC 621.05 TC 618.04 TC 617.46
BC 619.91 BC 620.58 BC 620.25 BC 620.65 BC 620.16 BC 620.65 BC 620.00 BC 620.55 BC 617.54 BC 616.96
Designed J.J.L.
Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-20.DWG.C2.04 24X36 30SC.
Reviewed K.A.K.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-20
Title
GRADING PLAN
Sheet No.
C2.04
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1107 of 1174
Page 1108
Land Surveying
Environmental
STOP
Architecture
Engineering
610
605
STOP
605
STOP
SHEET C2.51 RESTAURANT 2,380 SF
SHEET C2.52
605
355 Research Parkway
605
FUTURE DRIVE-THRU RETAIL
Meriden, CT 06450
2,925 G.S.F. (203) 630-1406
610
615
FUTURE
STOP
615
615
615 615 615
615 615 615 615
615
615
615
615
7/17/2026
RESTAURANT 2,380 SF
FUTURE DRIVE-THRU
CAUTION
CAUTION
CAUTION
CAUTION
UE
EN
A V
COSTCO WHOLESALE
E
WEST SENECA, NEW YORK
A D
L
SLADE AVENUE
S
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
RID
CAUTION
±18K S.F. MDO
GE
FFE = ±620.60
ROA
CAUTION
158K PROTO
812 PARKING SPACES
CAUTION
D
SHEET C2.53 SHEET C2.54 DN
Desc.
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XO2401824-01 ; KM2401824-KeyMap
DN
REVISIONS
DateNo.
Designed J.J.L.
OVERALL MASTER Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-25.DWG.C2.50 24X36 60SC.
Reviewed K.A.K.
ENGINEER.
Scale 1"=60'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-25
Title
OVERALL DRAINAGE
PLAN
Sheet No.
C2.50
GRAPHIC SCALE
ISSUED FOR PERMITTING 60 30 0 60
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1108 of 1174
Page 1109
Land Surveying
Environmental
Architecture
Engineering
DRAINAGE PLAN LEGEND
PROPERTY LINE
LIMIT OF DISTURBANCE AND SITEWORK
CONTRACT LIMIT LINE
SAWCUT LINE
STORM LINE
PROVIDE AND INSTALL TYPE C CATCH BASIN
PROVIDE AND INSTALL TYPE C-L CATCH BASIN
PROVIDE AND INSTALL CIRCULAR STRUCTURE
355 Research Parkway
PROVIDE AND INSTALL MANHOLE Meriden, CT 06450
(203) 630-1406
PROVIDE AND INSTALL FOUNDATION
UNDERDRAIN/ FROST FREE FILL DRAIN
STORM LINE W/ RIGID CLOSED CELL INSULATION
RESTAURANT 2,380 SF
FUTURE DRIVE-THRU
615
7/17/2026
618 615
COSTCO WHOLESALE
WEST SENECA, NEW YORK
CB-123
CB-124 TF=616.04
TF=616.01 INV IN=611.66 (SW)
INV IN=612.03 (SE) INV OUT=611.66 (NE)
SLADE AVENUE
PROVIDE AND INSTALL INV OUT=612.03 (NE)
PAVEMENT UNDERDRAINS
AT CATCH BASIN (TYP.)
618
74LF 18" HDPE @ 0.50% 64LF 18" HDPE @ 0.50%
11.14%
%
0.50
PE @
619
" HD
F 15
620
66L
621
CB-125
TF=617.61
INV OUT=612.36 (NW)
622
617
623
618
617
CAUTION
625
CAUTION
4
62
5
62
SHEET 2.51 SHEET 2.52 6 CB-114
62 TF=617.61
CB-113A INV IN=611.65 (SW)
TF=617.52 INV OUT=611.65 (NE)
626
CB-113B INV IN=612.27 (SW)
TF=618.65 INV OUT=612.02 (NE)
INV OUT=613.40 (NE)
PROVIDE AND INSTALL 12" CMP
CAUTION
CAUTION
CAUTION
CAUTION
AT 0.5% SLOPE. MATCH
EXISTING INVERT.
PROVIDE AND INSTALL 63LF 15" HDPE @ 1.78% 75LF 18" HDPE @ 0.50% 64LF 18" HDPE @ 0.50%
618
619
CAUTION
625
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
TYPE "C" CATCH BASIN .
CAUTION
CAUTION
TF. = 627.33
7
E
62
6
5
62
62
4
U 62
620
CAUTION
N
7.1
MH-101
CAUTION
3 0%
62
1%
0.5
E
TF=618.15
INV IN=610.70 (S) 618 E@
P
V HD
CAUTION
2
62 INV IN=611.07 (SE) 6"
F3
CAUTION
A 64L
DN
DN
INV OUT=610.70 (N)
1
62
D E 620
Desc.
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XO2401824-01 ; KM2401824-KeyMap
SHEET 2.53 SHEET 2.54 0%
A
0.5
E@
L
P
HD
0"
CAUTION
CAUTION
S
CAUTION
CAUTION
% F3
.75
REVISIONS
0 96L
CB-112
Date
620 TF=618.53
KEY MAP INV IN=611.18 (S)
628
627
INV OUT=611.18 (N)
No.
6
62
5
62
142LF 24" HDPE @ 0.50%
4
62
3
62 2
62 1 Designed J.J.L.
62 0
62 Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-25.DWG.C2.51 24X36 30SC.
Reviewed K.A.K.
619 Scale 1"=30'
61
619
9
CB-111B Project No. 2401824
TF=618.23 620
INV OUT=613.23 (E) Date 07/17/2026
0%
0.5 CAD File:
PE@ C2401824-25
HD
619
0"
620 LF3 Title
225
DRAINAGE PLAN
70
MH-100
LF
TF=619.54
1
5"
620 620 INV IN=611.78 (S)
HD
INV IN=613.27 (SE)
PE
620 INV OUT=611.78
620 (NW) 620
@
620
0.5
73LF 24" HDPE @ 0.50%
0%
Sheet No.
C2.51
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1109 of 1174
Page 1110
Land Surveying
Environmental
DRAINAGE PLAN LEGEND
Architecture
Engineering
PROPERTY LINE
LIMIT OF DISTURBANCE AND SITEWORK 610
CONTRACT LIMIT LINE
605
SAWCUT LINE
STORM LINE
PROVIDE AND INSTALL TYPE C CATCH BASIN
PROVIDE AND INSTALL TYPE C-L CATCH BASIN
PROVIDE AND INSTALL CIRCULAR STRUCTURE
STOP
PROVIDE AND INSTALL MANHOLE 605 355 Research Parkway
Meriden, CT 06450
PROVIDE AND INSTALL FOUNDATION (203) 630-1406
UNDERDRAIN/ FROST FREE FILL DRAIN
STOP
ENERGY DISPERSION PAD TO
STORM LINE W/ RIGID CLOSED CELL INSULATION BE PROVIDED BY DEVELOPER
FLARED END-1
INV.=608.00 ENERGY DISPERSION PAD TO
RESTAURANT 2,380 SF BE PROVIDED BY DEVELOPER
605
605
FUTURE DRIVE-THRU DEVELOPER'S PLAN BY OTHERS FLARED END-2
RETAIL INV.=608.00
2,925 G.S.F.
610
615
FUTURE
7/17/2026
STOP
%
59
0.
615
@
615
E
615 615
P
HD
615
2"
F4
3L
615
14
615
615 615
156LF 36" HDPE @ 0.68%
615
MH-106
TF=615.40
INV IN=608.84 (E) CB-119
INV IN=608.84 (S) TF=615.65 615
615
INV OUT=608.84 (N) INV OUT=610.65 (SE)
615 615
618 616 16LF 12" HDPE @ 0.50%
2.95%
615
616
OIL WATER SEPARATOR
COSTCO WHOLESALE
617 TF=615.55
56
6" PVC ROOF LEADER DRAINS
LF
INV IN=610.57 (N)
WEST SENECA, NEW YORK
%
50 AT MIN. 0.5% (TYP.)
18
0. INV OUT=610.32 (S)
"H
CB-123 CB-118 @ 34LF 12" DI @ 0.50%
DP
TF=616.04 PE
TF=615.61 HD
E@
INV IN=611.66 (SW) MH-202
CB-121 INV IN=609.18 (SE)
42" TF=615.42
2. 0
INV OUT=611.66 (NE) TF=615.96 INV IN=610.63 (SW) LF
SLADE AVENUE
9 INV IN=610.62 (NE)
1%
INV IN=610.97 (SW) INV OUT=609.18 (N) 6 PROVIDE AND INSTALL
INV OUT=610.97 (NE) CB-207 INV IN=610.97 (SW)
GATE VALVE (TYP.) TF=615.02 INV IN=609.07 (SE)
INV OUT=611.18 (NE) INV OUT=609.07 (NW)
41
6
61
74LF 18" HDPE @ 0.50% 64LF 18" HDPE @ 0.50% 74LF 24" HDPE @ 0.50% 67LF 24" HDPE @ 0.50% LF
15
" HD 33LF 15" HDPE @ 0.50%
CB-122 CB-120 PE
16LF 36" HDPE @ 0.51% TF=615.26 23LF 18" HDPE @ 0.50% 4" PVC ROOF LEADER DRAINS @ PROVIDE AND INSTALL PAVEMENT
TF=615.96 0.5 UNDERDRAINS AT CATCH BASIN (TYP.)
INV IN=611.34 (SW) INV IN=610.15 (N) MH-103 AT MIN. 0.5% (TYP.) 0%
INV OUT=611.34 (NE) INV IN=609.97 (NE) TF=615.67 61 RESTAURANT 2,380 SF
PROVIDE AND INSTALL 6
6
INV OUT=609.97 (W) CB-206
61
INV IN=610.08 (N)
CLEAN OUT (TYP.) TF=615.04
0.
INV IN=610.08 (E)
99
MH-105 INV IN=610.08 (SE) INV OUT=610.79 (SW) FUTURE DRIVE-THRU
%
TF=615.77 INV OUT=610.08 (SW)
INV IN=609.26 (S)
INV OUT=609.26 (NW)
0%
0.5
173LF 36" HDPE @ 0.50%
@
D PE
"H ROOF LEADER
7
61
6
F3 INVERT= 611.00 (TYP.)
8L
617 18
CAUTION
CAUTION
CAUTION
CAUTION
CONNECT DRAIN TO ROOF 617
LEADER DRAIN (TYP.)
CB-209 (6FT DIA.)
SHEET 2.51 SHEET 2.52 CB-114 617 TF=616.38
TF=617.61 MH-104 CB-116 INV OUT=611.38 (SE)
INV IN=611.65 (SW) TF=617.33 TF=617.31
INV OUT=611.65 (NE) INV IN=610.20 (SE) INV IN=611.33 (NE) 61
7 2%
INV OUT=610.20 (N) INV OUT=611.33 (SW) 0.9
PROVIDE AND INSTALL 6"
11LF 36" HDPE @ 0.53% 617 ROOF LEADER 2%
HDPE ROOF DRAIN @ MIN. INVERT= 611.00 (TYP.) 0.9
74LF 18" HDPE @ 0.50% 67LF 18" HDPE @ 0.50% 0.5% SLOPE (TYP.)
CB-212
CAUTION
CAUTION
CAUTION
CAUTION
%
58LF 12" DI @ 2.09%
TF=616.30
1.81
INV IN=611.27 (SW) CB-208 PROVIDE AND INSTALL
75LF 18" HDPE @ 0.50% 64LF 18" HDPE @ 0.50% CB-115 CB-210 GATE VALVE (TYP.)
INV OUT=611.27 (NE) CB-211 617 TF=616.33
TF=617.44 TF=616.30
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
DEVELOPER'S PLAN BY OTHERS
CAUTION
CAUTION
CAUTION
TF=616.30
CAUTION
INV IN=611.33 (SW) INV IN=610.27 (SW)
INV IN=610.93 (SW) INV IN=610.59 (SW) INV IN=610.17 (NW)
INV IN=610.96 (NE) CB-117 INV OUT=610.59 (NE)
TF=617.17 INV OUT=610.93 (NE) INV OUT=610.27 (NE)
INV IN=610.26 (SE)
INV OUT=610.26 (NW) INV OUT=611.67 (SW)
CAUTION
23LF 36" HDPE @ 0.50%
MH-101 MH-102
CAUTION
0 %
TF=618.15 0.5 TF=617.66
INV IN=610.70 (S) 618 E@ INV IN=610.38 (S) CB-205
P
HD
CAUTION
INV IN=611.07 (SE) 6" INV OUT=610.38 (NW) 53LF 12" HDPE @ 0.50% 67LF 15" HDPE @ 0.51% 67LF 18" HDPE @ 0.51% 64LF 18" HDPE @ 0.50% 67LF 24" HDPE @ 0.51% TF=615.95
F3
CAUTION
617
INV IN=609.93 (SW)
INV OUT=610.70 (N) 64L
DN
INV IN=609.93 (SE)
DN
CB-213
TF=616.67 INV OUT=609.93 (NW)
INV OUT=611.53 (NE)
Desc.
618
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XO2401824-01 ; KM2401824-KeyMap
SHEET 2.53 SHEET 2.54 0%
0.5
@
PE
" HD
CAUTION
CAUTION
0 61
CAUTION
CAUTION
3 61
REVISIONS
F 7
CAUTION
96L 7
CAUTION
61
7
Date
CAUTION
CAUTION
61
KEY MAP
9
619
61
No.
61
7
8
142LF 24" HDPE @ 0.50%
Designed J.J.L.
Drawn J.J.L.
0.50%
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-25.DWG.C2.52 24X36 30SC.
Reviewed K.A.K.
Scale 1"=30'
619
" HDPE @
Project No. 2401824
Date 07/17/2026
619 61 CAD File:
220LF 30
8 C2401824-25
61
61 8
9 61
8 Title
619
620
DRAINAGE PLAN
MH-100
TF=619.54
INV IN=611.78 (S) 620
INV IN=613.27 (SE) 620
INV OUT=611.78
620 (NW) 620 620
73LF 24" HDPE @ 0.50% Sheet No.
C2.52
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1110 of 1174
Page 1111
Land Surveying
142LF 24" HDPE @ 0.50%
4
Environmental
62
3
62
DRAINAGE PLAN LEGEND 62
2
Architecture
Engineering
1
62 0
62
PROPERTY LINE
619
61
LIMIT OF DISTURBANCE AND SITEWORK 619
9
CB-111B
CONTRACT LIMIT LINE TF=618.23 620
INV OUT=613.23 (E)
SAWCUT LINE 0%
0.5
E@
STORM LINE DP
619
H
620 30"
PROVIDE AND INSTALL TYPE C CATCH BASIN LF
225
PROVIDE AND INSTALL TYPE C-L CATCH BASIN
70
MH-100
LF
PROVIDE AND INSTALL CIRCULAR STRUCTURE TF=619.54
15"
620 620 INV IN=611.78 (S)
H
INV IN=613.27 (SE)
DP
PROVIDE AND INSTALL MANHOLE 355 Research Parkway
E
620 INV OUT=611.78
620 (NW) 620
@
Meriden, CT 06450
620
0.5
PROVIDE AND INSTALL FOUNDATION 73LF 24" HDPE @ 0.50% (203) 630-1406
0%
UNDERDRAIN/ FROST FREE FILL DRAIN
INV IN=612.14 (S)
STORM LINE W/ RIGID CLOSED CELL INSULATION CB-111A 23LF 24" HDPE @ 0.50% INV OUT=612.14 (N) 46LF 6" HDPE @ 0.50%
TF=619.02 INV IN=612.25 (S)
INV IN=612.31 (SE) INV IN=612.25 (E)
INV OUT=612.25 (N)
77LF 24" HDPE @ 0.50%
INV IN=612.88 (W)
INV OUT=612.31 (N) 19LF 6" HDPE @ 9.68%
19LF 6" HDPE @ 8.90%
INV IN=612.43 (S) PROVIDE AND INSTALL 6"
INV IN=612.43 (E) HDPE ROOF DRAIN @ MIN.
INV OUT=612.43 (N) 0.5% SLOPE (TYP.)
PROVIDE AND INSTALL
PAVEMENT UNDERDRAINS
%
50
AT CATCH BASIN (TYP.) CB-110
0.
TF=618.70 7/17/2026
@
ROOF LEADER
PE
INV IN=612.69 (SE) 0
62 INVERT= 614.10
HD
INV OUT=612.69 (NW) INV IN=612.63 (SE)
8"
INV OUT=612.63 (N)
L F1
18LF 18" HDPE @ 0.50% ROOF LEADER
41
INVERT= 614.10
64LF 24" HDPE @ 0.50%
9 CAUTION
24LF 10" HDPE @ 5.80%
PROVIDE AND INSTALL RIGID 61 36LF 18" HDPE @ 0.50%
INV IN=612.72 (SE)
CLOSED CELL INSULATION (TYP.) INV IN=612.72 (NE)
INV OUT=612.72 (NW) ROOF LEADER
INVERT= 614.10
ROOF LEADER
INVERT= 614.10 FFE = ±620.60
CAUTION
54LF 18" HDPE @ 0.50%
0
62 CB-109 APPROXIMATE LOCATION OF 4"
TF=618.63 PERFORATED PVC FROST FREE FILL
COSTCO WHOLESALE
INV IN=613.01 (SE) 24LF 10" HDPE @ 4.67%
DRAIN (TYP.). REFER TO
INV OUT=613.01 (NW) INV IN=612.99 (SE) ARCHITECTURAL DETAILS FOR EXACT
WEST SENECA, NEW YORK
INV IN=612.39 (NE) LOCATION.
INV OUT=612.99 (NW)
59LF 18" HDPE @ 0.50%
ROOF LEADER
SLADE AVENUE
INVERT= 614.10
74LF 24" HDPE @ 0.50%
CB-108 23LF 10" HDPE @ 7.77%
620
TF=618.70 INV IN=613.29 (SE)
9
61
61
INV IN=613.38 (SE)
42LF 15" HDPE @ 0.50% 41LF 18" HDPE @ 0.50%
INV IN=612.29 (NE)
9
INV OUT=613.38 (NW) INV OUT=613.29 (NW)
ROOF LEADER
64LF 24" HDPE @ 0.50%
CAUTION
INVERT= 614.10
PROVIDE AND INSTALL RIGID FOUNDATION UNDERDRAIN
CLOSED CELL INSULATION (TYP.) 23LF 10" HDPE @ 2.60% CONNECTION
INV IN=613.49 (SE) 4" PVC PIPE @ MIN. 0.50%
INV IN=613.49 (NE) SLOPE
INV OUT=613.49 (NW)
CAUTION
CB-107 ROOF LEADER
TF=618.66 INV IN=613.70 (SE) INVERT= 614.10
RID
INV IN=613.70 (E) INV IN=613.10 (NE)
INV OUT=613.70 (NW) INV OUT=613.70 (NW)
50%
SHEET 2.51 SHEET 2.52
@ 0.
GE
57LF 15" HDPE @ 0.50%
PE
ROOF LEADER
" HD
INVERT= 613.50
18
23LF 10" HDPE @ 1.71%
77LF
ROA
CAUTION
CAUTION
CAUTION
CAUTION
PROVIDE AND INSTALL 10"
HDPE ROOF DRAIN @ MIN.
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CB-106
CAUTION
CAUTION
INV IN=613.99 (NE) 0.5% SLOPE (TYP.)
TF=618.85 INV OUT=613.99 (NW)
INV IN=614.09 (E)
D
INV OUT=614.09 (W)
0
CAUTION
62
61L
CAUTION
ROOF LEADER
F1
INVERT= 613.50
8" H
CAUTION
DPE
CAUTION
@0
DN
DN
.50
%
Desc.
117LF 18" HDPE @ 0.50% 122LF 15" HDPE @ 0.50%
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XO2401824-01 ; KM2401824-KeyMap
SHEET 2.53 SHEET 2.54
62 CB-104
0
REVISIONS
PROVIDE AND INSTALL RIGID 62 0
TF=619.85 0 62
CLOSED CELL INSULATION (TYP.) INV IN=614.98 (NE)
Date
INV OUT=614.98 (SW)
KEY MAP
No.
CB-105 CB-103
TF=619.23 TF=619.61
INV IN=614.39 (NE) INV IN=615.59 (NE)
INV OUT=614.39 (W) INV OUT=615.59 (SW) Designed J.J.L.
Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-25.DWG.C2.53 24X36 30SC.
Reviewed K.A.K.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-25
Title
DRAINAGE PLAN
Sheet No.
C2.53
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1111 of 1174
Page 1112
Land Surveying
142LF 24" HDPE @ 0.50%
Environmental
DRAINAGE PLAN LEGEND
Architecture
Engineering
0.50%
PROPERTY LINE
LIMIT OF DISTURBANCE AND SITEWORK 619
" HDPE @
CONTRACT LIMIT LINE
SAWCUT LINE 619 61
220LF 30
8
STORM LINE 61
61 8
9 61
8
PROVIDE AND INSTALL TYPE C CATCH BASIN
619
620
PROVIDE AND INSTALL TYPE C-L CATCH BASIN
MH-100
PROVIDE AND INSTALL CIRCULAR STRUCTURE TF=619.54
INV IN=611.78 (S) 620
INV IN=613.27 (SE) 620
PROVIDE AND INSTALL MANHOLE INV OUT=611.78
620 (NW) 620 620 355 Research Parkway
Meriden, CT 06450
PROVIDE AND INSTALL FOUNDATION 73LF 24" HDPE @ 0.50% (203) 630-1406
UNDERDRAIN/ FROST FREE FILL DRAIN
STORM LINE W/ RIGID CLOSED CELL INSULATION 46LF 6" HDPE @ 0.50%
APPROXIMATE LOCATION OF 4" PERFORATED
PVC FROST FREE FILL DRAIN (TYP.). REFER TO
62
0
ARCHITECTURAL DETAILS FOR EXACT LOCATION.
618
PROVIDE AND INSTALL 6" 1.46% CB-204
HDPE ROOF DRAIN @ MIN. TF=618.19
0.5% SLOPE (TYP.) INV IN=611.03 (SE)
INV OUT=611.03 (NW)
ROOF LEADER APPROXIMATE LOCATION OF 4" PERFORATED 7/17/2026
INVERT= 614.10 PVC FROST FREE FILL DRAIN (TYP.). REFER TO
ARCHITECTURAL DETAILS FOR EXACT LOCATION. 619
PROVIDE AND INSTALL FOOTING DRAIN
ROOF LEADER INVERT=612.41 (TYP.) 617 INV IN=611.31 (SE)
INV IN=611.31 (SW)
INV OUT=611.31 (NW) 61
9
220LF 10" HDPE @ 0.50%
620
DEVELOPER'S PLAN BY OTHERS
MH-201
TF=619.34
COSTCO WHOLESALE
TRENCH DRAIN-1 INV IN=611.45 (SW)
TF=616.43
±18K S.F. MDO
INV IN=611.45 (SE)
INV OUT=612.63 (NE)
WEST SENECA, NEW YORK
INV OUT=611.45 (NW)
64LF 15" HDPE @ 1.83% INV IN=611.54 (SE)
INV IN=611.54 (SW)
70LF 24" HDPE @ 0.50%
ROOF LEADER INV OUT=611.54 (NW)
INVERT= 614.10 29LF 10" HDPE @ 8.87%
SLADE AVENUE
FFE = ±620.60 45LF 10" HDPE @ 4.88%
620
INV IN=611.89 (SE)
INV IN=611.89 (SW)
191 LF 24" HDPE @ 0.50%
ROOF LEADER INV OUT=611.89 (NW)
INVERT= 614.10
158K PROTO
FOUNDATION UNDERDRAIN
CONNECTION
4" PVC PIPE @ MIN. 0.50%
SLOPE
INV IN=612.21 (SE)
PROVIDE AND INSTALL FOOTING DRAIN INV IN=612.21 (SW)
INV OUT=612.21 (NW)
812 PARKING SPACES
ROOF LEADER
INVERT= 614.10 26LF 24" HDPE @ 0.50%
45LF 10" HDPE @ 3.90%
48LF 15" HDPE @ 2.19%
45LF 10" HDPE @ 4.18%
INV IN=612.34 (SE)
SHEET 2.51 SHEET 2.52 TRENCH DRAIN-2
INV IN=612.34 (SW)
INV OUT=612.34 (NW)
ROOF LEADER INVERT=613.24 TF=616.47
INV OUT=613.47 (NE) 17LF 24" HDPE @ 0.50%
0
62
DN
MH-200
TF=618.69
DN INV IN=612.43 (E)
INV IN=612.43 (S)
APPROXIMATE LOCATION OF 4" 619
CAUTION
CAUTION
CAUTION
CAUTION
INV IN=612.43 (SW)
PERFORATED PVC FROST FREE FILL DRAIN 153LF 10" HDPE @ 0.50% INV OUT=612.43 (NW)
(TYP.). REFER TO ARCHITECTURAL
DETAILS FOR EXACT LOCATION. 8LF 10" HDPE @ 0.50%
618(SW)
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
INV IN=612.47
PROVIDE AND INSTALL RIGID INV OUT=612.47 (N) 41LF 18" HDPE @ 0.50%
ROOF LEADER INVERT=613.56 CLOSED CELL INSULATION (TYP.) CB-203
617 TF=616.57
617 INV IN=612.63 (S)
INV OUT=612.63 (W)
CAUTION
CAUTION
CAUTION
617
CAUTION
158LF 10" HDPE @ 0.50%
0% INV IN=612.77 (S)
0.5
DN
DN
CB-201 INV IN=612.77 (SW)
PROVIDE AND INSTALL RIGID @ INV OUT=612.77 (N)
TF=616.79
CLOSED CELL INSULATION (TYP.) DPE
INV IN=613.29 (SW)
"H
618
619
620
Desc.
INV OUT=613.29 (NE) 5
122LF 15" HDPE @ 0.50% F1
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XO2401824-01 ; KM2401824-KeyMap
SHEET 2.53 100LF 15" HDPE @ 0.50% 81LF 12" HDPE @ 0.50%
SHEET 2.54 617 L
52
9.43%
86LF 12" HDPE @ 1.32% 66LF 12" HDPE @ 0.50% 51LF 12" HDPE @ 0.50%
8
REVISIONS
62 0 0 61
0 62 62
Date
PROVIDE AND INSTALL RIGID
KEY MAP CLOSED CELL INSULATION (TYP.)
No.
CB-103 CB-101 CB-200A CB-200B CB-202
CB-102 TF=617.49
TF=619.61 TF=620.10 TF=620.00 TF=619.76 TF=617.31
INV IN=615.59 (NE) INV OUT=616.50 (SW) INV OUT=614.76 (NE) INV IN=613.62 (SW) INV IN=613.03 (SW)
INV IN=616.09 (NE) INV OUT=613.62 (NE)
INV OUT=615.59 (SW) INV OUT=616.09 (SW) INV OUT=613.03 (N) Designed J.J.L.
PROVIDE AND INSTALL PAVEMENT Drawn J.J.L.
UNDERDRAINS AT CATCH BASIN (TYP.)
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-25.DWG.C2.54 24X36 30SC.
Reviewed K.A.K.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-25
Title
DRAINAGE PLAN
Sheet No.
C2.54
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1112 of 1174
Page 1113
Land Surveying
Environmental
Architecture
Engineering
NOTE:
WAREHOUSE WALL PER PLAN REMOVE CONCRETE DOOR STOOP - WHEN
FROST PROTECTION IS NOT PROVIDED CONCRETE SLAB
PAVEMENT AS NOTED - CONCRETE SLAB WAREHOUSE WALL CONCRETE CURB
EGRESS DOOR PER PLAN
PROVIDE DENSOBAND AT WAREHOUSE WALL
CONCRETE / ASPHALT EDGE PER PLAN DENSOBAND
FINISH FLOOR
FINISH FLOOR TIE SLAB TO LANDSCAPING PER PLAN
EGRESS DOOR FOUNDATION PAVING
SLOPE 2% MAX
FINISH FLOOR SLOPE 2% MAX
0'-0"
FINISH FLOOR
UNDER-SLAB OVER- 355 Research Parkway
Meriden, CT 06450
EXCAVATION UNDER-SLAB OVER (203) 630-1406
UNDER-SLAB OVER
STRUCTURAL FILL EXCAVATION
5'-0" VERIFY EXCAVATION
(AS REQUIRED) STRUCTURAL VERIFY
UNLESS NOTED OTHERWISE STRUCTURAL
FILL (AS REQUIRED)
FILL (AS REQUIRED)
FROST - RESISTANT FILL 1
FROST - RESISTANT FILL 1 1
1
SLOPE
SLOPE
DRAIN TILE LOWER THAN FOOTING,
FOOTING OVER EXCAVATION DRAIN TILE LOWER THAN FOOTING,
CONNECT TO STORM SEWER
STRUCTURAL FILL (AS REQUIRED) CONNECT TO STORM SEWER
FREE DRAINAGE AGGREGATE FREE DRAINING AGGREGATE
FOOTING OVER EXCAVATION/ FOOTING OVER EXCAVATION /
STRUCTURAL FILL (AS REQUIRED) STRUCTURAL FILL (AS REQUIRED) 7/17/2026
FOUNDATION DRAIN ALONG WALL FOUNDATION AND UNDERDRAIN DETAIL FOUNDATION AND UNDERDRAIN DETAIL AT RECEIVING DOOR
AT EGRESS DOOR WITH STOOP
BOLLARD
COSTCO WHOLESALE
WAREHOUSE CONCRETE SLAB
WEST SENECA, NEW YORK
ENTRY WALL
DENSOBAND DENSOBAND
0'-0" FINISH FLOOR PAVING
CONCRETE SLAB PAVING SLOPE
SLADE AVENUE
VERIFY FROST-
RESISTANT FILL VERIFY
STRUCT FILL PER GEOTECH FROST - RESISTANT FILL
1
1 1
1
1 1
DRAIN TILE LOWER THAN FOOTING - DRAIN TILE LOWER THAN FOOTING,
CONNECT TO STORM SEWER FOOTING OVER EXCAVATION CONNECT TO STORM SEWER
(AS REQUIRED) FREE DRAIN AGGERATE
FREE DRAINING AGGREGATE
FROST PROTECTION WEDGE UNDERDRAIN AT ASPHALT EDGE FOUNDATION AND UNDERDRAIN DETAIL AT CANOPY
WAREHOUSE WALL PER PLAN
EGRESS DOOR
TIE SLAB TO FOUNDATION
DENSOBAND
0'-0" FIN FLR FINISH FLOOR
SLOPE 2% MAX THOROUGHLY COMPACT
WITH MFR
WITH MFR
0'-0" FINISH FLOOR PRIOR TO PAVING CONCRETE SLAB PAVING
1'-7 1/2"
VERIFY
VERIFY
1'-8"
CONCRETE LOADING DOCK -
SLOPE PER STRUCTURAL
Xref (s): ; XB2401824-00 ; excavateddropinletprotection ; filterfabricdropinletprotection ; reinforcedsiltfence ; siltfence ; stabilizedconstructionaccess
4'-0" 6'-0" UNDER-SLAB OVER
EXCAVATION VERIFY
STRUCTURAL 5'-0"
STRUCT FILL
UNLESS NOTED OTHERWISE
FILL (AS REQUIRED) PER GEOTECH
Desc.
SLOPE SLOPE
4'-2" BFF FROST - 1
LOADING DOCK RESISTANT FILL 1
CONCRETE FOOTING AND
REVISIONS
PIT PER STRUCTURAL - VERIFY
WITH LEVELER MANUFACTURER
Date
UNDER-SLAB OVER EXCAVATION DRAIN TILE LOWER THAN FOOTING -
STRUCTURAL FILL (AS REQUIRED) DRAIN TILE LOWER THAN FOOTING,
No.
CONNECT TO STORM SEWER
CONNECT TO STORM SEWER
FREE DRAINAGE AGGREGATE
FOOTING OVER EXCAVATION / Designed
FOOTING OVER EXCAVATION STRUCTURAL FILL (AS REQUIRED) Drawn
(AS REQUIRED) Reviewed
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-110.DWG.C2.100 24X36.
Scale
Project No.
Date
CAD File:
FOOTING DRAIN AT LOADING DOCK FOUNDATION AND UNDERDRAIN AT EGRESS DOOR WITH WALKWAY Title
GRADING AND
DRAINAGE DETAILS
FOUNDATION AND UNDERDRAIN DETAILS (SEE ARCHITECTURAL DRAWINGS FOR DETAILS, SHOWN FOR REFERENCE ONLY)
Sheet No.
ISSUED FOR PERMITTING
NOT RELEASED FOR CONSTRUCTION
C2.100
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1113 of 1174
Page 1114
Land Surveying
Environmental
Architecture
Engineering
EXTERIOR GRADE PER CIVIL
FOOTING PER STRUCTURAL
FROST LINE PER
FINISHED FLOOR
GEOTECHNICAL -
FOOTING MAY BE LOWER
EXTERIOR WALL
PAVING, PER CIVIL
-OR-
LANDSCAPING
355 Research Parkway
Meriden, CT 06450
AGGREGATE BASE (203) 630-1406
NOTCH FOOTING PIPE INVERT PER
WHERE REQUIRED CIVIL - 2% MINIMUM
DAMPPROOFING
CAST IRON FITTING CAST IRON PIPE
DRAIN ROCK
ISOMETRIC MINIMUM 6"
COVER ABOVE PIPE
SCALE: NTS
GRID
1'-0"
MIN
COLUMN PER STRUCTURAL /
METAL BUILDING SUPPLIER
GEOTEXTILE FABRIC
SURROUND -
MIN
EXTEND UP WALL
2"
COLUMN PLINTH EXTERIOR WALL PER PLAN 7/17/2026
BELOW FLOOR
MAIN FRAME COLUMNS
COLUMN FOOTING BELOW MINIMUM 4" DIA RIGID
NOTE: 6" MIN PVC PERFORATED
CONNECT TO STORM SYSTEM FOOTING DRAIN -
6'-0" MIN AT
COLUMN INSTALL WITH HOLES DOWN
FOOTING BELOW
WALL FOOTING BELOW
FOOTING DRAIN
NOTE:
RUN RAIN LEADER STRIGHT FROM
ROOF DRAIN WITHOUT OFFSETS
TO WALL - LOCATE TO MISS PLINTH
STORM SEWER INLET
NOTCH FOOTING BELOW AS REQUIRED PAVEMENT - SLOPE PER GRADING PLAN
COSTCO WHOLESALE
AGGREGATE BASE COURSE
WEST SENECA, NEW YORK
WALL FOOTING BELOW 1'-0"
1'-1" PAVEMENT UNDERDRAIN -
PLAN 4" MINIMUM PENETRATION
INTO SUBGRADE
4" DIAMETER SLOPE SLOPE
SLADE AVENUE
COLUMN BEYOND EXTERIOR WALL PER PLAN PERFORATED PVC PIPE -
PLACED WITH PERFORATIONS DOWN
PAVEMENT OR
INSULATION ON RAIN LEADER
LANDSCAPING - SEE PLAN
6"
PVC WRAP TO 8'-0" AFF WHERE EXPOSED SLOPE 2% MINIMUM AASHTO #57 STONE - COMPACTED
TO A POINT OF NON-MOVEMENT
1'-0"
NOTE: VARIES - SEE CIVIL DRAWINGS - BENEATH THE COMPACTING EQUIPMENT
BLOCK-OUT SLAB 2" LARGER THAN MINIMUM 1"
RAIN LEADER SIZE - PROVIDE 4" 4"
SEALANT AND BACK ROD ALL AROUND 0'-0" FIN FLR
MIRAFI 140NS NON-WOVEN
SLOPE GEOTEXTILE OR EQUIVALENT -
2"
EXTERIOR GRADE
.
OVERLAP MINIMUM OF 12" ON TOP
CONCRETE FOOTING - VERIFY
.
FOOTING DEPTH / THICKNESS
FROST DEPTH
WITH STRUCTURAL DRAWINGS
PER GEOTECHNICAL
NOTCH FOOTING AT RAIN
LEADER WHERE REQUIRED BOTTOM OF FOOTING MAY
BE LOWER THAN FROST -
.
CONCRETE FOOTING SEE STRUCT DRAWINGS
AT COLUMN BEYOND
2% MINIMUM PAVEMENT UNDERDRAIN DETAIL
MINIMUM 6" COVER ABOVE PIPE SLOPE
RAIN LEADER UNDER FOOTING INVERT
NOTE:
PAVEMENT UNDERDRAINS SHALL EXTEND OUT A MINIMUM
SECTION
ELEVATION OF 10 FEET FROM ALL SIDES OF INLETS BELOW PAVEMENT
SECTION (+/-) 5'-0" BY PLUMBING PER
CIVIL
RAIN LEADER INVERT ELEVATION PAVEMENT UNDERDRAIN AT INLETS
Xref (s): ; XB2401824-00 ; excavateddropinletprotection ; filterfabricdropinletprotection ; reinforcedsiltfence ; siltfence ; stabilizedconstructionaccess
Desc.
CONCRETE SLAB
REVISIONS
DENSOBAND
WAREHOUSE WALL PER PLAN
Date
PAVING
SLOPE 2% MAX
No.
Designed J.J.L.
Drawn J.J.L.
Reviewed K.A.K.
UNDER-SLAB OVER STRUCT FILL
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-110.DWG.C2.101 24X36.
EXCAVATION PER GEOTECH Scale 1"=30'
STRUCTURAL FILL Project No. 2401824
(AS REQUIRED) Date 07/17/2026
CAD File:
C2401824-110
Title
GRADING AND
DRAIN TILE LOWER THAN FOOTING,
CONNECT TO STORM SEWER DRAINAGE DETAILS
FOOTING OVER EXCAVATION/
STRUCTURAL FILL (AS REQUIRED)
Sheet No.
WALKWAY AT PARKING
ISSUED FOR PERMITTING C2.101
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1114 of 1174
Page 1115
Land Surveying
Environmental
Architecture
Engineering
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
THIS SIDE TOWARD CURB
1" OPENING MAX
DI
FOUNDRY NAME
7/17/2026
HERRINGBONE PATTERN
NOTES:
1. ALL INLETS ON THE COSTCO SITE SHALL HAVE A
HERRINGBONE PATTERN WITH A MAXIMUM OPENING OF 1"
2. ALL INLETS SHALL BE ASPHALT COATED CAST IRON
HERRINGBONE GRATE CURB INLET STORM DRAIN GRATE TYPICAL STORM SEWER TRENCH SECTION PRECAST STORM MANHOLE DETAIL
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
FRAME AND COVER
SECTION
SECTION
HEIGHT CHART
HEIGH
WEIGHT
T
TYPE 1 CATCH
BASIN RISER
48" FLAT TOP
JOINT DETAIL
Xref (s): ; XB2401824-00 ; excavateddropinletprotection ; filterfabricdropinletprotection ; reinforcedsiltfence ; siltfence ; stabilizedconstructionaccess
BASE
Desc.
REVISIONS
DateNo.
Designed J.J.L.
Drawn J.J.L.
BASE HEIGHT
CHART Reviewed K.A.K.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-110.DWG.C2.102 24X36.
HEIGH Scale 1"=30'
WEIGHT
T
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-110
Title
GRADING AND
DRAINAGE DETAILS
CATCH BASIN STRUCTURE ONSITE CATCH BASIN STRUCTURE- >5' PIPE COVER
Sheet No.
ISSUED FOR PERMITTING C2.102
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1115 of 1174
Page 1116
Land Surveying
Environmental
Architecture
Engineering
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
CLEANOUT DETAIL IN LANDSCAPED AREA CLEANOUT DETAIL IN PAVED AREA
(STORM/SANITARY) (STORM/SANITARY)
7/17/2026
GATE VALVE AND VALVE BOX DETAIL
FOR OIL/WATER SEPARATOR
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SECTION A-A
SLADE AVENUE
STANDARD MANHOLE FRAME AND COVER STANDARD MANHOLE STEP
Xref (s): ; XB2401824-00 ; excavateddropinletprotection ; filterfabricdropinletprotection ; reinforcedsiltfence ; siltfence ; stabilizedconstructionaccess
Desc.
PLAN
REVISIONS
DateNo.
Designed J.J.L.
Drawn J.J.L.
Reviewed K.A.K.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-110.DWG.C2.103 24X36.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-110
Title
GRADING AND
DRAINAGE DETAILS
TRENCH DRAIN SECTION
TRENCH DRAIN OIL/WATER SEPARATOR Sheet No.
ISSUED FOR PERMITTING C2.103
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1116 of 1174
Page 1117
Land Surveying
Environmental
STOP
Architecture
Engineering
610
605
STOP
605
STOP
SHEET C3.01 RESTAURANT 2,380 SF
SHEET C3.02
605
355 Research Parkway
605
FUTURE DRIVE-THRU NE
RETAIL SE I INV 606
NE SW NV 606 .08 Meriden, CT 06450
RIM INV 60 PVC 2,925 G.S.F. PVC RIM INV 60 .18 (203) 630-1406
SAN 612.95 8.73 8" S @ 0.5 8" S @ 0.5 SAN 613.17 6.18 610
615
MH
11 189 DR-35 0% FUTURE 301 DR-35 0% MH
9
LF LF
STOP
615
615
615 615 615
NE
SW INV 60
615 RIM INV 60 7.69 615
615 615
SAN 613.26 7.79 615
MH
10
615
615
615
7/17/2026
RESTAURANT 2,380 SF
PVC FUTURE DRIVE-THRU
8" S @ 0.5
398 DR-35 0%
LF
CAUTION
CAUTION
CAUTION
CAUTION
U E
E N
AV
COSTCO WHOLESALE
E
WEST SENECA, NEW YORK
AD
WV
L
SLADE AVENUE
S
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
NW
INV
RIM 608.1
SAN 615.15 7
MH
12
WV WV
CAUTION
WV
RID
CAUTION
±18K S.F. MDO
WV
GE
FFE = ±620.60
ROA
CAUTION
158K PROTO
812 PARKING SPACES
CAUTION
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XO2401824-01 ; KM2401824-KeyMap
D
SHEET C3.03 SHEET C3.04 DN
Desc.
DN
REVISIONS
DateNo.
WV Designed J.J.L.
AUTHORITY. Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-30.DWG.C3.00 24X36 60SC.
Reviewed K.A.K.
E UTILITIES IN OR
Scale 1"=60'
Project No. 2401824
PANY IS REQUIRED
Date 07/17/2026
CAD File:
C2401824-30
Title
OVERALL SITE
UTILITY PLAN
Sheet No.
C3.00
GRAPHIC SCALE
ISSUED FOR PERMITTING 60 30 0 60
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1117 of 1174
Page 1118
Land Surveying
Environmental
SITE UTILITIES LEGEND
Architecture
Engineering
PROPERTY LINE
LIMIT OF DISTURBANCE AND SITEWORK
CONTRACT LIMIT LINE
SAWCUT LINE
E E ELECTRIC LINE
G G GAS LINE
W W WATER LINE
S S SANITARY SEWER LINE
T T TELECOMMUNICATIONS LINE
ETC ELECTRIC AND TELECOMMUNICATIONS LINE 355 Research Parkway
Meriden, CT 06450
OH OH OVERHEAD ELECTRIC LINE (203) 630-1406
STORM LINE
RESTAURANT 2,380 SF
FUTURE DRIVE-THRU
615
7/17/2026
615
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
PROVIDE AND INSTALL RIGID
METAL CONDUIT DOWN POLE TO
SUBSURFACE CONNECTION FOR
PRIMARY ELECTRICAL SERVICES
PROVIDE AND INSTALL (2) 6" PVC SCH 80 CONDUITS
ENCASED IN CONCRETE AND WITH PULL STRINGS
FOR ELECTRICAL SERVICE TO WAREHOUSE
CAUTION
CAUTION
PROVIDE AND INSTALL
TELECOMMUNICATIONS TRAFFIC
RATED HANDHOLE PER UTILITY
PROVIDER SPECIFICATIONS (TYP.)
SHEET 3.01 SHEET 3.02 RELOCATE UTILITY POLE AND OVERHEAD
WIRES, COORDINATE WITH UTILITY
PROVIDERS. PER SITE PHOTOS, OVERHEAD
LINE APPEARS TO BE FIBER OPTIC CABLES.
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
UE
N REMOVE AND DISPOSE OF EXISTING
CAUTION
E
GAS LINE TO BE RELOCATED.
V
COORDINATE WITH THE GAS
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XO2401824-01 ; KM2401824-KeyMap
CAUTION
CAUTION
COMPANY FOR RELOCATION.
A
DN
DN
E
PROVIDE AND INSTALL (4) 2" PVC
SCH 80 CONDUITS WITH PULL
D
Desc.
STRINGS FOR TELECOMMUNICATIONS
SHEET 3.03 SHEET 3.04
A
SERVICE TO FUEL FACILITY
L
CAUTION
CAUTION
S
CAUTION
CAUTION
REVISIONS
PROVIDE AND INSTALL RIGID METAL CONDUIT DOWN
POLE TO SUBSURFACE CONNECTION FOR PRIMARY
Date
TELECOMMUNICATIONS SERVICES
KEY MAP
No.
PROVIDE AND INSTALL FIRE HYDRANT ASSEMBLY,
6" DIP HYDRANT LATERAL, GATE VALVE, THRUST Designed J.J.L.
BLOCKS, AND BOLLARDS AS REQUIRED BY LOCAL Drawn J.J.L.
UTILITY PROVIDER AND/OR FIRE MARSHALL (TYP.)
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-30.DWG.C3.01 24X36 30SC.
Reviewed K.A.K.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
SMH-4 C2401824-30
TF=619.83
INV IN=611.97 (SE) Title
PROVIDE AND INSTALL TELECOMMUNICATIONS INV OUT=611.87 (NE) 214LF 8" PVC @ 0.50%
TRAFFIC RATED HANDHOLE PER UTILITY
PROVIDER SPECIFICATIONS (TYP.)
SITE UTILITY PLAN
PROVIDE AND INSTALL (4) 4" AND (4) 2" PVC SCH
80 CONDUITS WITH PULL STRINGS FOR
PROVIDE AND INSTALL (4) 4" PVC SCH 80 TELECOMMUNICATIONS SERVICE
CONDUITS WITH PULL STRINGS FOR WV
TELECOMMUNICATIONS SERVICE TO WAREHOUSE Sheet No.
C3.01
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1118 of 1174
Page 1119
Land Surveying
Environmental
SITE UTILITIES LEGEND
Architecture
Engineering
PROPERTY LINE
LIMIT OF DISTURBANCE AND SITEWORK
CONTRACT LIMIT LINE
610
SAWCUT LINE 605
E E ELECTRIC LINE
G G GAS LINE
W W WATER LINE
S S SANITARY SEWER LINE
T T TELECOMMUNICATIONS LINE
STOP
ETC ELECTRIC AND TELECOMMUNICATIONS LINE 605 355 Research Parkway
Meriden, CT 06450
OH OH OVERHEAD ELECTRIC LINE (203) 630-1406
STOP
STORM LINE
RESTAURANT 2,380 SF
605
605
FUTURE DRIVE-THRU NE I
RETAIL SE I NV 606
NE I SW NV 606 .08
RIM NV 608 PVC 2,925 G.S.F. PVC RIM INV 60 .18
SAN 612.95 .73 8" S @ 0.5 8" S @ 0.5 SAN 613.17 6.18 610
615
MH
11 189 DR-35 0% FUTURE 301 DR-35 0% MH
9
LF LF
7/17/2026
STOP
615
615
615 615 615
NE I
SW NV 607
615 RIM INV 60 .69 615
615 615
SAN 613.26 7.79 615
MH
10
615
615
615
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
RESTAURANT 2,380 SF
PVC FUTURE DRIVE-THRU
8" S @ 0.5
398 DR-35 0%
LF
PROVIDE AND INSTALL ELECTRIC REMOVE AND DISPOSE OF
TRAFFIC RATED HANDHOLE PER UTILITY EXISTING GAS LINE TO BE
PROVIDER SPECIFICATIONS (TYP.) RELOCATED. COORDINATE
WITH THE GAS COMPANY
PROVIDE AND INSTALL TRANSFORMER, FOR RELOCATION.
PROVIDE AND INSTALL ELECTRIC
TRANSFORMER PAD, AND BOLLARDS.
CAUTION
CAUTION
CAUTION
SECONDARY CONDUITS FROM
CAUTION
COORDINATE WITH ELECTRIC UTILITY PROVIDER. TRANSFORMER TO FUEL FACILITY, NUMBER,
TYPE, AND SIZE PER ELECTRICAL PLANS.
COORDINATE CONNECTION TO
DEVELOPER'S SANITARY SEWER SYSTEM.
SHEET 3.01 SHEET 3.02 PROPOSED INV IN= 607.43 (SW)
0%
0.5
@
VC
CAUTION
CAUTION
CAUTION
CAUTION
PROVIDE AND INSTALL FIRE HYDRANT ASSEMBLY, "P
6" DIP HYDRANT LATERAL, GATE VALVE, THRUST SMH-8 F8
3L
BLOCKS, AND BOLLARDS AS REQUIRED BY LOCAL TF=616.65 11
UTILITY PROVIDER AND/OR FIRE MARSHALL (TYP.) INV IN=608.03 (SE)
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
INV IN=608.09 (S)
INV OUT=607.99 (N)
CAUTION
CAUTION
WV
PROVIDE AND INSTALL (4) 2" PVC SCH 80
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XO2401824-01 ; KM2401824-KeyMap
CONDUITS WITH PULL STRINGS FOR
CAUTION
TELECOMMUNICATIONS SERVICE TO FUEL FACILITY
CAUTION
DN
DN
Desc.
SHEET 3.03 SHEET 3.04
CAUTION
CAUTION
CAUTION
CAUTION
REVISIONS
CAUTION
%
CAUTION
0
0.5
C@
Date
CAUTION
CAUTION
V
"P
KEY MAP 302L
F8
No.
PROVIDE AND INSTALL FIRE HYDRANT ASSEMBLY,
356LF 8" PVC @ 1.83%
6" DIP HYDRANT LATERAL, GATE VALVE, THRUST Designed J.J.L.
BLOCKS, AND BOLLARDS AS REQUIRED BY LOCAL Drawn J.J.L.
UTILITY PROVIDER AND/OR FIRE MARSHALL (TYP.)
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-30.DWG.C3.02 24X36 30SC.
SMH-6 PROVIDE AND INSTALL FIRE HYDRANT ASSEMBLY, Reviewed K.A.K.
SMH-5
TF=619.44 TF=619.02 6" DIP HYDRANT LATERAL, GATE VALVE, THRUST NW Scale 1"=30'
INV IN=610.80 (SW) INV IN=611.84 (SE) BLOCKS, AND BOLLARDS AS REQUIRED BY LOCAL
INV
INV IN=609.70 (SW) RIM 608.1 Project No. 2401824
INV OUT=610.70 (NE) UTILITY PROVIDER AND/OR FIRE MARSHALL (TYP.)
INV OUT=609.60 (N) Date 07/17/2026
SAN 615.15 7
MH CAD File:
12 C2401824-30
Title
214LF 8" PVC @ 0.50%
SITE UTILITY PLAN
200LF 8" PVC @ 0.50%
PROVIDE AND INSTALL 10"X6"X10" DIP
PROVIDE AND INSTALL 10"X6"X10" DIP TEE FITTING WITH RESTRAINED JOINTS
TEE FITTING WITH RESTRAINED JOINTS AND/OR THRUST BLOCK (TYP.)
AND/OR THRUST BLOCK (TYP.)
WV WV
74LF 6" HPP @ 2.00% Sheet No.
C3.02
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1119 of 1174
Page 1120
Land Surveying
Environmental
SITE UTILITIES LEGEND PROVIDE AND INSTALL FIRE HYDRANT ASSEMBLY,
Architecture
Engineering
6" DIP HYDRANT LATERAL, GATE VALVE, THRUST
BLOCKS, AND BOLLARDS AS REQUIRED BY LOCAL
UTILITY PROVIDER AND/OR FIRE MARSHALL (TYP.)
PROPERTY LINE
LIMIT OF DISTURBANCE AND SITEWORK
CONTRACT LIMIT LINE
SAWCUT LINE
E E ELECTRIC LINE SMH-4
G G GAS LINE TF=619.83
INV IN=611.97 (SE)
W W WATER LINE PROVIDE AND INSTALL TELECOMMUNICATIONS INV OUT=611.87 (NE) 214LF 8" PVC @ 0.50%
TRAFFIC RATED HANDHOLE PER UTILITY
S S SANITARY SEWER LINE PROVIDER SPECIFICATIONS (TYP.)
T T TELECOMMUNICATIONS LINE PROVIDE AND INSTALL (4) 4" AND (4) 2" PVC SCH
80 CONDUITS WITH PULL STRINGS FOR
ETC ELECTRIC AND TELECOMMUNICATIONS LINE PROVIDE AND INSTALL (4) 4" PVC SCH 80 TELECOMMUNICATIONS SERVICE 355 Research Parkway
CONDUITS WITH PULL STRINGS FOR WV Meriden, CT 06450
OH OH OVERHEAD ELECTRIC LINE TELECOMMUNICATIONS SERVICE TO WAREHOUSE (203) 630-1406
STORM LINE
PROVIDE AND INSTALL BENDS, RESTRAINTS
AND THRUST BLOCK OER LOCAL UTILITY
PROVIDER (TYP.)
220LF 8" PVC @ 0.50%
7/17/2026
PROVIDE AND INSTALL FIRE HYDRANT ASSEMBLY,
6" DIP HYDRANT LATERAL, GATE VALVE, THRUST
BLOCKS, AND BOLLARDS AS REQUIRED BY LOCAL
UTILITY PROVIDER AND/OR FIRE MARSHALL (TYP.)
CAUTION
PROVIDE AND INSTALL 10"X6"X10" DIP
TEE FITTING WITH RESTRAINED JOINTS
AND/OR THRUST BLOCK (TYP.) WV
PROVIDE AND INSTALL 10" DIP FIRE PROTECTION
WATER LOOP, APPROXIMATE LOCATION,
COORDINATE WITH FIRE PROTECTION ENGINEER
AND UTILITY PROVIDER (TYP.)
PROVIDE AND INSTALL TELECOMMUNICATIONS
TRAFFIC RATED HANDHOLE PER UTILITY
CAUTION
PROVIDER SPECIFICATIONS (TYP.)
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
27LF 6" HPP @ 9.00%
BLDG INV OUT=615.60 (SW)
SMH-3
85LF 8" PVC @ 0.50%
TF=620.21
INV IN=613.17 (SE)
INV IN=613.17 (NE)
INV OUT=613.07 (NW)
CAUTION
11LF 6" HPP @ 2.00%
PROVIDE AND INSTALL
GREASE INTERCEPTOR 2
SMH-2 TF=620.45
TF=620.17 INV IN=614.50 (NE)
INV IN=613.70 (SE) INV OUT=614.33 (SW)
INV IN=614.11 (NE)
CAUTION
INV OUT=613.60 (NW) BLDG INV OUT=614.60 (SW)
RID
51LF 8" PVC @ 0.50%
5LF 6" HPP @ 2.00%
SMH-1
TF=620.21
SHEET 3.01 SHEET 3.02 INV IN=614.05 (NE)
INV OUT=613.95 (NW)
GE
BLDG INV OUT=614.60 (SW)
ROA
CAUTION
CAUTION
CAUTION
CAUTION
27LF 6" HPP @ 2.00%
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
PROVIDE AND INSTALL (4) 4" AND (4) 2" PVC SCH
80 CONDUITS WITH PULL STRINGS FOR
TELECOMMUNICATIONS SERVICE
D
PROVIDE AND INSTALL TELECOMMUNICATIONS
CAUTION
TRAFFIC RATED HANDHOLE PER UTILITY
PROVIDER SPECIFICATIONS (TYP.)
CAUTION
TELECOMMUNICATIONS SERVICE
OUT TO FUEL FACILITY
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XO2401824-01 ; KM2401824-KeyMap
CAUTION
CAUTION
DN
TELECOMMUNICATIONS SERVICE
DN
CONNECTION TO WAREHOUSE
Desc.
SHEET 3.03 SHEET 3.04
REVISIONS
Date
KEY MAP
No.
CONNECT WATER SERVICE TO WATER MAIN. CONTRACTOR TO
COORDINATE ALL UTILITY CONNECTIONS WITH UTILITY PROVIDE AND INSTALL 10" DIP FIRE PROTECTION WATER
PROVIDER, CONTRACTOR TO VERIFY BURIAL DEPTH AND SIZELOOP, APPROXIMATE LOCATION, COORDINATE WITH FIRE Designed J.J.L.
PRIOR TO CONSTRUCTION, CONNECT TO MAIN IN PROTECTION ENGINEER AND UTILITY PROVIDER (TYP.) REMOVE AND DISPOSE OF EXISTING GAS LINE
ACCORDANCE WITH UTILITY PROVIDER REQUIREMENTS (TYP.) Drawn J.J.L.
PROVIDE AND INSTALL 4" DOMESTIC TO BE RELOCATED. COORDINATE WITH THE
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-30.DWG.C3.03 24X36 30SC.
WATER SERVICE (TYP.) GAS COMPANY FOR RELOCATION. Reviewed K.A.K.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-30
Title
SITE UTILITY PLAN
Sheet No.
C3.03
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1120 of 1174
Page 1121
Land Surveying
Environmental
SITE UTILITIES LEGEND PROVIDE AND INSTALL FIRE HYDRANT ASSEMBLY,
Architecture
Engineering
356LF 8" PVC @ 1.83%
6" DIP HYDRANT LATERAL, GATE VALVE, THRUST
BLOCKS, AND BOLLARDS AS REQUIRED BY LOCAL
UTILITY PROVIDER AND/OR FIRE MARSHALL (TYP.)
PROPERTY LINE SMH-5 SMH-6 PROVIDE AND INSTALL FIRE HYDRANT ASSEMBLY,
LIMIT OF DISTURBANCE AND SITEWORK TF=619.44 TF=619.02 6" DIP HYDRANT LATERAL, GATE VALVE, THRUST NW
INV IN=611.84 (SE) BLOCKS, AND BOLLARDS AS REQUIRED BY LOCAL
INV
CONTRACT LIMIT LINE INV IN=610.80 (SW)
INV IN=609.70 (SW) RIM 608.1
INV OUT=610.70 (NE) UTILITY PROVIDER AND/OR FIRE MARSHALL (TYP.)
SAWCUT LINE INV OUT=609.60 (N)
SAN 615.15 7
E E ELECTRIC LINE MH
12
G G GAS LINE
W W WATER LINE 214LF 8" PVC @ 0.50%
S S SANITARY SEWER LINE 200LF 8" PVC @ 0.50%
PROVIDE AND INSTALL 10"X6"X10" DIP
T T TELECOMMUNICATIONS LINE PROVIDE AND INSTALL 10"X6"X10" DIP TEE FITTING WITH RESTRAINED JOINTS
TEE FITTING WITH RESTRAINED JOINTS AND/OR THRUST BLOCK (TYP.)
ETC ELECTRIC AND TELECOMMUNICATIONS LINE AND/OR THRUST BLOCK (TYP.) 355 Research Parkway
WV WV Meriden, CT 06450
OH OH OVERHEAD ELECTRIC LINE 74LF 6" HPP @ 2.00%
(203) 630-1406
STORM LINE
PROVIDE AND INSTALL EXTERIOR GAS SERVICE
PIPING, SIZE AND TYPE OF PIPE TO BE DETERMINED PROVIDE AND INSTALL BENDS, RESTRAINTS
BY PROVIDER, COORDINATE WITH UTILITY PROVIDER AND THRUST BLOCK OER LOCAL UTILITY
PROVIDER (TYP.)
PROVIDE AND INSTALL GREASE INTERCEPTOR 1 PROVIDE AND INSTALL TRANSFORMER PAD
TF=616.65 AND BOLLARDS. COORDINATE WITH
INV IN=613.49 (SE) ELECTRIC UTILITY PROVIDER. 7/17/2026
INV OUT=612.99 (NW)
6LF 6" HPP @ 2.00% PROVIDE AND INSTALL (2) 6" PVC SCH
BLDG INV OUT=613.60 (NW) 80 CONDUITS ENCASED IN CONCRETE
GAS SERVICE CONNECTION TO BUILDING. AND WITH PULL STRINGS FOR
PROVIDE AND INSTALL EXTERIOR GAS METER, ELECTRICAL SERVICE TO WAREHOUSE
COORDINATE WITH UTILITY PROVIDER PROVIDE AND INSTALL ELECTRIC TRAFFIC RATED
HANDHOLE PER UTILITY PROVIDER SPECIFICATIONS (TYP.)
PROVIDE AND INSTALL SAND SEPARATOR
TF=616.95
INV IN=614.04 (SW)
INV OUT=614.24 (NE)
COSTCO WHOLESALE
PROVIDE AND INSTALL ELECTRIC SECONDARY
±18K S.F. MDO
WV
CONDUITS FROM TRANSFORMER TO BUILDING,
WEST SENECA, NEW YORK
NUMBER, TYPE, AND SIZE PER ELECTRIC PLANS
PROVIDE AND INSTALL 10"X10"X10" DIP
TEE FITTING WITH RESTRAINED JOINTS
SLADE AVENUE
BLDG INV OUT=614.10 (NE) AND/OR THRUST BLOCK
9LF 6" HPP @ 2.00% SMH-7
TF=619.85
INV IN=614.86 (SW)
4" DIP DOMESTIC WATER SERVICE CONNECTION TO BUILDING, INV OUT=614.76 (NW)
PROVIDE AND INSTALL METER PER UTILITY PROVIDER REQUIREMENTS
FFE = ±620.60
10" DIP FIRE PROTECTION WATER SERVICE CONNECTION TO
BUILDING. PROVIDE AND INSTALL METER AND EQUIPMENT PER
UTILITY PROVIDER REQUIREMENTS
PROVIDE AND INSTALL GATE VALVE,
VALVE BOX, AND COVER (TYP.)
158K PROTO
812 PARKING SPACES
SHEET 3.01 SHEET 3.02 PROVIDE AND INSTALL ELECTRIC TRAFFIC RATED
HANDHOLE PER UTILITY PROVIDER SPECIFICATIONS (TYP.)
DN APPROXIMATE LOCATION OF RELOCATED GAS LINE.
CONTRACTOR TO COORDINATE ALL UTILITY WORK WITH
DEVELOPER AND UTILITY PROVIDER, CONTRACTOR TO
VERIFY EXISTING LOCATION, PRESSURE, AND SIZE PRIOR
TO CONSTRUCTION, RELOCATION IN ACCORDANCE WITH
DN
UTILITY PROVIDER REQUIREMENTS.
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XO2401824-01 ; KM2401824-KeyMap
CAUTION
CAUTION
DN
DN
Desc.
SHEET 3.03 PROVIDE AND INSTALL BENDS, RESTRAINTS
SHEET 3.04 AND THRUST BLOCK OER LOCAL UTILITY
PROVIDER (TYP.)
REVISIONS
CONNECT TO EXISTING GAS LINE. CONTRACTOR TO
WV COORDINATE ALL UTILITY WORK WITH DEVELOPER
Date
AND UTILITY PROVIDER, CONTRACTOR TO VERIFY
KEY MAP BURIAL DEPTH AND SIZE PRIOR TO CONSTRUCTION,
RELOCATION IN ACCORDANCE WITH UTILITY
No.
PROVIDER REQUIREMENTS.
PROVIDE AND INSTALL 10" DIP FIRE PROTECTION WATER
LOOP, APPROXIMATE LOCATION, COORDINATE WITH FIRE PROVIDE AND INSTALL 10"X6"X10" DIP TEE FITTING WITH
PROTECTION ENGINEER AND UTILITY PROVIDER (TYP.) RESTRAINED JOINTS AND/OR THRUST BLOCK (TYP.) Designed J.J.L.
PROVIDE AND INSTALL 4" DOMESTIC PROVIDE AND INSTALL (2) 6" PVC SCH 80 CONDUITS
ENCASED IN CONCRETE AND WITH PULL STRINGS Drawn J.J.L.
WATER SERVICE (TYP.) PROVIDE AND INSTALL FIRE HYDRANT ASSEMBLY,
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-30.DWG.C3.04 24X36 30SC.
FOR ELECTRICAL SERVICE TO WAREHOUSE Reviewed K.A.K.
6" DIP HYDRANT LATERAL, GATE VALVE, THRUST
BLOCKS, AND BOLLARDS AS REQUIRED BY LOCAL Scale 1"=30'
UTILITY PROVIDER AND/OR FIRE MARSHALL (TYP.) Project No. 2401824
Date 07/17/2026
PROVIDE AND INSTALL RIGID CAD File:
METAL CONDUIT DOWN POLE TO C2401824-30
SUBSURFACE CONNECTION FOR
PRIMARY ELECTRICAL SERVICES
Title
SITE UTILITY PLAN
Sheet No.
C3.04
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1121 of 1174
Page 1122
Land Surveying
Environmental
Architecture
Engineering
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
7/17/2026
TYPICAL WATER MAIN AND SERVICE TRENCH DETAIL HYDRANT ASSEMBLY DETAIL THRUST BLOCKS FOR WATER LINES
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
MECHANICAL JOINT RESTRAINT
Xref (s): ; XB2401824-00 ; excavateddropinletprotection ; filterfabricdropinletprotection ; reinforcedsiltfence ; siltfence ; stabilizedconstructionaccess
Desc.
REVISIONS
DateNo.
Designed J.J.L.
Drawn J.J.L.
Reviewed K.A.K.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-110.DWG.C3.100 24X36.
Scale 1"=30'
Project No. 2401824
TELECOM AND GAS TRENCH DETAIL ELECTRICAL CONDUIT CONCRETE ENCASEMENT Date
CAD File:
07/17/2026
C2401824-110
Title
SITE UTILITY
DETAILS
Sheet No.
ISSUED FOR PERMITTING C3.100
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1122 of 1174
Page 1123
Land Surveying
Environmental
Architecture
Engineering
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
7/17/2026
GREASE INTERCEPTOR DETAIL GI-1,2
TYPICAL SANITARY SEWER TRENCH SECTION
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SECTION A-A
SLADE AVENUE
SAND SEPARATOR S/S
STANDARD MANHOLE STEP
Xref (s): ; XB2401824-00 ; excavateddropinletprotection ; filterfabricdropinletprotection ; reinforcedsiltfence ; siltfence ; stabilizedconstructionaccess
CONCRETE PROTECTION FOR PIPING CLEANOUT DETAIL IN PAVED AREA
Desc.
REVISIONS
DateNo.
Designed J.J.L.
Drawn J.J.L.
Reviewed K.A.K.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-110.DWG.C3.101 24X36.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-110
Title
SITE UTILITY
DETAILS
PRECAST SANITARY MANHOLE SEWER MANHOLE FRAME AND COVER
Sheet No.
FLEXIBLE PIPE TO MANHOLE CONNECTION CLEANOUT DETAIL IN LANDSCAPED AREA ISSUED FOR PERMITTING C3.101
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1123 of 1174
Page 1124
Land Surveying
Environmental
Architecture
Engineering
NfA
SHEET C4.01 NfA
RESTAURANT 2,380 SF
FUTURE DRIVE-THRU
NE
SHEET C4.02
RETAIL NE
SE I INV 606
SW NV 606 .08
355 Research Parkway
Meriden, CT 06450
RIM INV 608 PVC 2,925 G.S.F. PVC RIM INV 60 .18 (203) 630-1406
SAN 612.95 .73 8" S @ 0.5 8" S @ 0.5 SAN 613.17 6.18
MH
11 189 DR-35 0% FUTURE 301 DR-35 0% MH
9
LF LF
NE
SW INV 60
RIM INV 60 7.69
SAN 613.26 7.79
MH
10
7/17/2026
RESTAURANT 2,380 SF
SF PVC FUTURE DRIVE-THRU
8" S @ 0.5
398 DR-35 0%
LF
SF
SF
CAUTION
CAUTION
CAUTION
CAUTION
RgA
U E Ud
N
SF
SF
V E
A
COSTCO WHOLESALE
E
WEST SENECA, NEW YORK
D
WV
L A
SLADE AVENUE
S
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
NW
INV
RIM 608.1
SAN 615.15 7
MH
12
Ud WV WV
Ud
SF
SF
SF
SF
SF
CAUTION
RgA WV
RID
CAUTION
±18K S.F. MDO
WV
GE
FFE = ±620.60
R
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XC2401824-40 ; XO2401824-01 ; KM2401824-KeyMap
CAUTION
158K PROTO
OAD
812 PARKING SPACES
CAUTION
Ud
SHEET C4.03 SHEET C4.04 DN
Desc.
DN
Ud
REVISIONS
DateNo.
WV Designed J.J.L.
Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-40.DWG.C4.00 24X36 60SC.
Reviewed K.A.K.
CsB Scale
Project No.
1"=60'
2401824
Date 07/17/2026
CAD File:
C2401824-40
NfA NfA Title
OVERALL EROSION
AND SEDIMENT
CONTROL PLAN
Sheet No.
C4.00
GRAPHIC SCALE
ISSUED FOR PERMITTING 60 30 0 60
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1124 of 1174
Page 1125
Land Surveying
Environmental
EROSION CONTROL LEGEND
Architecture
Engineering
PROPERTY LINE
LIMIT OF DISTURBANCE AND SITEWORK CONTRACT
LIMIT LINE
SAWCUT LINE
SILT FENCE BARRIER
COMPOST FILTER SOCK
TEMPORARY CONSTRUCTION FENCE
SILT SACK INLET PROTECTION
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
CONCRETE WASH PIT
SF RESTAURANT 2,380 SF
SF
TEMPORARY MATERIAL STOCKPILE
FUTURE DRIVE-THRU
SF
SF
SOIL TYPE BOUNDARY 7/17/2026
CONSTRUCTION ENTRANCE
618
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
618
11.14%
619
620
621
622
PROVIDE AND INSTALL
617
SILT FENCE (TYP.)
623
LIMIT OF DISTURBANCE AND
618
CONTRACT LIMIT LINE (TYP.)
617
CAUTION
625
CAUTION
4
RgA
62
PROVIDE AND INSTALL SILT SACK
INLET PROTECTION (TYP.)
5
62
SHEET 4.01 SHEET 4.02 PROVIDE AND INSTALL CONSTRUCTION ENTRANCE 6
WITH MIN. DIMENSIONS OF 50' LENGTH X 12' WIDTH 62
Ud
626
CAUTION
CAUTION
CAUTION
CAUTION
618
619
CAUTION
625
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
7
E
62
6
5
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XC2401824-40 ; XO2401824-01 ; KM2401824-KeyMap
62
62
4
U 62
620
CAUTION
N
7.1
CAUTION
3
62
1%
CAUTION
CAUTION
V E 622
618
A
DN
DN
1
62
D E 620
Desc.
SHEET 4.03 SHEET 4.04
LA
CAUTION
CAUTION
S
CAUTION
CAUTION
5%
REVISIONS
0.7
Date
620
KEY MAP
628
627
No.
6
62
5
62
4
62
3
62 2
62 1 Designed J.J.L.
62 0
62 Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-40.DWG.C4.01 24X36 30SC.
Reviewed K.A.K.
619 Scale 1"=30'
61
619
9
Project No. 2401824
620
Date 07/17/2026
CAD File:
C2401824-40
619
620 Title
EROSION AND
SEDIMENT CONTROL
Ud
620 620
PLAN
620 620 620
WV
620
Sheet No.
SF SF
C4.01
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1125 of 1174
Page 1126
Land Surveying
Environmental
EROSION CONTROL LEGEND
Architecture
Engineering
PROPERTY LINE
LIMIT OF DISTURBANCE AND SITEWORK CONTRACT
LIMIT LINE
SAWCUT LINE
SILT FENCE BARRIER
NfA
COMPOST FILTER SOCK
TEMPORARY CONSTRUCTION FENCE
SILT SACK INLET PROTECTION
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
CONCRETE WASH PIT
SF RESTAURANT 2,380 SF
NE I
SF
TEMPORARY MATERIAL STOCKPILE
FUTURE DRIVE-THRU RETAIL SE I NV 606
SF
NE I SW NV 606 .08
SF RIM NV 608 PVC 2,925 G.S.F. PVC RIM INV 60 .18
SAN 612.95 .73 8" S @ 0.5 8" S @ 0.5 SAN 613.17 6.18
MH
11 189 DR-35 0% FUTURE 301 DR-35 0% MH
9
LF PROVIDE AND INSTALL
SOIL TYPE BOUNDARY LF
7/17/2026
SILT FENCE (TYP.)
PROPERTY LINE IS LIMIT OF DISTURBANCE
AND CONTRACT LIMIT LINE UNLESS
CONSTRUCTION ENTRANCE OTHERWISE NOTED (TYP.)
NE I PROVIDE AND INSTALL
DESIGNATED STOCKPILE LOCATION
SW NV 607 CONCRETE WASH PIT
PROVIDE AND INSTALL CONSTRUCTION ENTRANCE PROVIDE AND INSTALL CONSTRUCTION ENTRANCE
WITH PERIMETER SILT FENCE RIM INV 60 .69
WITH MIN. DIMENSIONS OF 50' LENGTH X 12' WIDTH WITH MIN. DIMENSIONS OF 50' LENGTH X 12' WIDTH
SAN 613.26 7.79
MH
10
615 615
618 616
2.95%
616
COSTCO WHOLESALE
617
WEST SENECA, NEW YORK
PROVIDE AND INSTALL SILT
SACK INLET PROTECTION (TYP.)
SLADE AVENUE
PROVIDE AND INSTALL COMPOST
FILTER SOCK (TYP.)
6
61
61 RESTAURANT 2,380 SF
6
6
61
SF
0.
99
PVC FUTURE DRIVE-THRU
%
8" S @ 0.5
398 DR-35 0%
SF
LF
SF
SF
7
SF
61
617
CAUTION
CAUTION
CAUTION
CAUTION
SF 617
SF
SHEET 4.01 SHEET 4.02 617
2%
SF
7
61 0.9
SF
617 2%
0.9
SF
CAUTION
CAUTION
CAUTION
CAUTION
%
1.81
617
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XC2401824-40 ; XO2401824-01 ; KM2401824-KeyMap
CAUTION
CAUTION
WV
CAUTION
618
CAUTION
617
DN
DN
Desc.
SHEET 4.03 SHEET 4.04 618
CAUTION
CAUTION
61
CAUTION
CAUTION
61
REVISIONS
7
CAUTION
7
CAUTION
61
7
Date
CAUTION
CAUTION
61
KEY MAP
9
619
61
No.
61
7
8
Designed J.J.L.
Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-40.DWG.C4.02 24X36 30SC.
Reviewed K.A.K.
NW Scale 1"=30'
619
INV
RIM 608.1 Project No. 2401824
Date 07/17/2026
619 SAN 615.15 7
61 MH CAD File:
8 12 C2401824-40
61
61 8
9 61
8 Title
619
620
EROSION AND
620
WV
620 620
620
620
WV
Ud SEDIMENT CONTROL
PLAN
Sheet No.
C4.02
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1126 of 1174
Page 1127
Land Surveying
4
Environmental
62
3
EROSION CONTROL LEGEND 62
62
2
Architecture
Engineering
1
62 0
62
PROPERTY LINE
LIMIT OF DISTURBANCE AND SITEWORK CONTRACT 619
61
619
9
LIMIT LINE
620
SAWCUT LINE
SILT FENCE BARRIER
619
COMPOST FILTER SOCK 620
TEMPORARY CONSTRUCTION FENCE
SILT SACK INLET PROTECTION
Ud
620 620
620 620 620 355 Research Parkway
WV Meriden, CT 06450
620
(203) 630-1406
CONCRETE WASH PIT
SF SF
SF SF
SF
SF
SF
SF
TEMPORARY MATERIAL STOCKPILE
SF
SF
SF
SF
SOIL TYPE BOUNDARY SF
7/17/2026
SF
0
62
DESIGNATED STOCKPILE LOCATION
CONSTRUCTION ENTRANCE WITH PERIMETER SILT FENCE
9 CAUTION
61
RgA WV
CAUTION
0
62
COSTCO WHOLESALE
WEST SENECA, NEW YORK
PROPERTY LINE IS LIMIT OF DISTURBANCE
SLADE AVENUE
AND CONTRACT LIMIT LINE UNLESS
OTHERWISE NOTED (TYP.)
PROVIDE AND INSTALL SILT FENCE (TYP.)
620
9
61
61
9
CAUTION
CAUTION
RID
SHEET 4.01 SHEET 4.02
GE
ROA
CAUTION
CAUTION
CAUTION
CAUTION
Ud
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
D
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XC2401824-40 ; XO2401824-01 ; KM2401824-KeyMap
620
CAUTION
CAUTION
CAUTION
CAUTION
DN
DN
Desc.
SHEET 4.03 SHEET 4.04
62
0
REVISIONS
62 0
0 62
Date
KEY MAP
No.
Designed J.J.L.
Drawn J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-40.DWG.C4.03 24X36 30SC.
Reviewed K.A.K.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-40
NfA Title
EROSION AND
SEDIMENT CONTROL
PLAN
Sheet No.
C4.03
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1127 of 1174
Page 1128
Land Surveying
Environmental
EROSION CONTROL LEGEND
Architecture
Engineering
PROPERTY LINE
LIMIT OF DISTURBANCE AND SITEWORK CONTRACT NW
619
INV
LIMIT LINE RIM 608.1
SAWCUT LINE SAN 615.15 7
619 61
SILT FENCE BARRIER 8 MH
12
61
COMPOST FILTER SOCK 61 8
9 61
8
619
TEMPORARY CONSTRUCTION FENCE 620
SILT SACK INLET PROTECTION
620
WV
620 620
620
620
WV
Ud 355 Research Parkway
Meriden, CT 06450
(203) 630-1406
CONCRETE WASH PIT
PROVIDE AND INSTALL
CONCRETE WASH PIT
SF
62
0
SF
TEMPORARY MATERIAL STOCKPILE 618
SF
SF
1.46%
SOIL TYPE BOUNDARY 7/17/2026
619
CONSTRUCTION ENTRANCE 617
61
9
620
COSTCO WHOLESALE
±18K S.F. MDO
WV
WEST SENECA, NEW YORK
SLADE AVENUE
FFE = ±620.60 620
158K PROTO
812 PARKING SPACES
SHEET 4.01 SHEET 4.02
DN
62
0
Ud
DN
619
CAUTION
CAUTION
CAUTION
CAUTION
618
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
PROVIDE AND INSTALLCOMPOST
FILTER SOCK (TYP.)
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XC2401824-40 ; XO2401824-01 ; KM2401824-KeyMap
617
CAUTION 617
CAUTION
CAUTION
617
CAUTION
DN
DN
618
619
620
Desc.
SHEET 4.03 SHEET 4.04 617
9.43%
8
REVISIONS
62 0 0 61
0 62 62
WV
Date
KEY MAP
No.
PROVIDE AND INSTALL
SILT SACK INLET
PROTECTION (TYP.)
CsB Designed
Drawn
J.J.L.
J.J.L.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-40.DWG.C4.04 24X36 30SC.
PROPERTY LINE IS LIMIT OF DISTURBANCE Reviewed K.A.K.
AND CONTRACT LIMIT LINE UNLESS Scale 1"=30'
OTHERWISE NOTED (TYP.)
Project No. 2401824
PROVIDE AND INSTALL Date 07/17/2026
SILT FENCE (TYP.)
CAD File:
C2401824-40
Title
NfA EROSION AND
SEDIMENT CONTROL
PLAN
Sheet No.
C4.04
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1128 of 1174
Page 1129
Land Surveying
Environmental
Architecture
Engineering
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
7/17/2026
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
Xref (s): ; XB2401824-00 ; excavateddropinletprotection ; filterfabricdropinletprotection ; reinforcedsiltfence ; siltfence ; stabilizedconstructionaccess
Desc.
REVISIONS
DateNo.
MATERIALS STOCKPILE DETAIL
Designed J.J.L.
Drawn J.J.L.
Reviewed K.A.K.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-110.DWG.C4.100 24X36.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-110
Title
EROSION AND
SEDIMENT CONTROL
PLAN DETAILS
Sheet No.
ISSUED FOR PERMITTING C4.100
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1129 of 1174
Page 1130
10,0
Land Surveying
Environmental
100' 00 SF
Architecture
ST O P
Engineering
FUT x100
URE '
RET
SYMBOL CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER AIL STOP
DECIDUOUS TREES
®
STOP
610 355 Research Parkway
605 Meriden, CT 06450
(203) 630-1406
STOP
605
STOP
EVERGREEN TREES
SHEET 5.01 RESTAURANT 2,380 SF
SHEET 5.02
605
605
FUTURE DRIVE-THRU NE
RETAIL SE I INV 606
NE SW NV 606 .08
RIM INV 608 PVC 2,925 G.S.F. PVC RIM INV 60 .18
SAN 612.95 .73 8" S @ 0.5 8" S @ 0.5 SAN 613.17 6.18 610
615
MH
11 189 DR-35 0% FUTURE 301 DR-35 0% MH
9
LF LF
STOP
615
615
NE
615
615 615 7/17/2026
SW INV 607
615 RIM INV 60 .69 615 615 615
SAN 613.26 7.79 615
MH
DECIDIOUS SHRUBS 10
615
615
615
®
EVERGREEN SHRUBS RESTAURANT 2,380 SF
PVC FUTURE DRIVE-THRU
8" S @ 0.5
398 DR-35 0%
COSTCO WHOLESALE
LF
WEST SENECA, NEW YORK
CAUTION
CAUTION
CAUTION
CAUTION
SLADE AVENUE
GROUNDCOVER
®
N UE WV
ORNAMENTAL GRASS
V E
E A
LAD
CAUTION
CAUTION
CAUTION
S
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
NOTES:
1) ALL SUBSTITUTIONS MUST RECEIVE APPROVAL FROM THE LANDSCAPE ARCHITECT PRIOR TO DELIVERY TO SITE.
2) PROVIDE AND INSTALL ALL PLANTS SHOWN ON THE PLANTING PLAN DRAWINGS; THE QUANTITIES IN THE PLANT LIST ARE PROVIDED FOR THE CONTRACTOR'S CONVENIENCE ONLY. IF
DISCREPANCIES OCCUR, THE LARGER QUANTITY SHALL APPLY.
NW
INV
3) IF THERE IS A DISCREPANCY BETWEEN BOTANICAL AND COMMON NAME, BOTANICAL NAME PREVAILS. RIM 608.1
SAN 615.15 7
MH
12
ZONING INFORMATION
LOCATION: WEST SENECA, NEW YORK WV WV
596 PARKING SPACES
ZONE: M-1 (MANUFACTURING DISTRICT)
USE: RETAIL (PERMITTED USE)
ITEM REQUIREMENTS PROPOSED VARIANCE
(2) BUILDING SETBACK AREAS ALONG STREETS, ACCESSWAYS, OR
ALONG PRIVATE DRIVES SHALL BE LANDSCAPED WITH A MINIMUM OF
ONE TREE FOR EVERY 40' OF LINEAR FRONTAGE. MIN. 1 TREE FOR EVERY 40' OF LINEAR FRONTAGE.
SLADE AVENUE = 532' (EXCLUDE PAVEMENT AREA) / 40 =14 TREE REQ.;SLADE AVENUE = 14 TREES PROP. NO
RIDGE ROAD = 82' (EXCLUDE EASEMENT AREA) / 40 = 2 TREES REQ. RIDGE ROAD = 2 TREES PROP.
CAUTION
SITE LANDSCAPING ACCESS DRIVE = 622' (EXCLUDE PAVEMENT AREA) / 40 = 16 TREES ACCESS DRIVE = 16 TREES PROP. WV
SEC 120-68.B. REQ.
Xref (s): ; XY240182401 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XL2401824-10 ; XO2401824-01 ; XC2401824-10 ; KM2401824-KeyMap
(3) BUILDING SETBACK AREAS SHALL INCLUDE COMPACT MASSINGS OF CAUTION
ORNAMENTAL PLANT MATERIAL, SUCH AS ORNAMENTAL TREES, PROPOSED LANDSCAPING EXCEEDS REQ. NO
FLOWERING SHRUBS, PERENNIALS, AND GROUND COVERS, AT A
±18K S.F. MDO
WV
MINIMUM OF ONE PLANT FOR EVERY 10' OF LINEAR FRONTAGE
FOUNDATION (1) BUILDING FOUNDATION LANDSCAPING SHALL BE PROVIDEDNOALONG
LANDSCAPING FOUNDATION PLANTINGS PROP. ALONG BUILDING
ALONG THE FRONT FACADE AS WELL AS ANY FACADES VISIBLE FROM YES
SEC 120-68.C FRONTAGE.
PUBLIC RIGHT-OF-WAY
(1) DECIDUOUS TREES SHALL BE ATLEAST 2.5" CAL., UNLESS LOCATED
Desc.
IN THE SIDE OR REAR YARD, WHERE THERE MAY BE A MINIMUMALL
CAL.
OFPROPOSED
1.5"
(2) EVERGREEN TREES SHALL BE 5' IN HEIGHT, UNLESS LOCATED IN
DECIDUOUS TREES ARE MIN. 2.5" CAL.
NO
216 PARKING SPACES
CAUTION FFE = ±620.60
ALL PROPOSED EVERGREEN TREES ARE MIN. 5' HT.NO
158K PROTO
REVISIONS
THE SIDE OR REAR YARD, WHERE THEY MAY BE A MIN. OF 4' IN HEIGHT.
MINIMUM PLANT SIZE
SEC 120-68.D
Date
(3) DECIDUOUS SHRUBS SHALL BE ATLEAST 24" IN HEIGHT, UNLESS
ALL PROPOSED DECIDUOUS SHRUBS ARE MIN. 24" HT.
LOCATED IN THE SIDE OR REAR YARD, WHERE THEY MAY BE A MINIMUM NO
812 PARKING SPACES
CAUTION
OF 15" IN HEIGHT.
RID
No.
(4) EVERGREEN SHRUBS SHALL BE A MINIMUM OF 18" IN HEIGHT,
ALLBE
UNLESS LOCATED IN THE SIDE OR REAR YARD, WHERE THEY MAY PROPOSED
A EVERGREEN SHRUBS ARE MIN. 18" HT.
NO
SHEET 5.03 SHEET 5.04
GE
MINIMUM OF 12" IN HEIGHT. DN
(1) PARKING LOT MEDIANS SHALL BE REQUIRED BETWEEN PARKING
10 FEET MINIMUM WIDTH LANDSCAPED MEDIANS Designed J.C.W.
DN
ROA
BLOCKS (MAXIMUM 40 PARKING SPACES). MEDIANS SHALL BEPROVIDED,
A PARKING BLOCKS ARE MORE THAN 40YES Drawn C.B.F.
MINIMUM OF 10 FEET IN WIDTH PARKING SPACES.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-50.DWG.C5.00 24X36 60SC.
Reviewed D.J.C.
(2) AT LEAST ONE LANDSCAPED ISLAND WITH A MINIMUM WIDTH OF Scale 1"=60'
D
FIVE FEET AND MINIMUM SIZE OF 160 SQUARE FEET SHALL BE LANDSCAPED ISLAND PROVIDED . YES
Project No. 2401824
PARKING LOT PROVIDED FOR EVERY 20 PARKING SPACES
LANDSCAPING Date 07/17/2026
SEC 120-68.F. (3) CIRCULATORY DRIVE AISLES AND LANDSCAPED ISLANDS SHALL BE
LANDSCAPED
INSTALLED SUCH THAT NO MORE THAN 20 PARKING SPACES IN A ISLANDS PROVIDED, SOME OF THEM CAD File:
YES
SPACED
SINGLE ROW, OR 40 IN A DOUBLE ROW, SHALL GO UNINTERRUPTED. MORE THAN 20 SPACES IN A ROW. C2401824-50
(5) ONE SHADE TREE SHALL BE PLANTED FOR EVERY 10 PARKING Title
SPACES. 108 SHADE TREES PROP. WITHIN PARKING LOT AREA
NO WV
809 PARKING SPACES / 10 = 81 SHADE TREES REQ. OVERALL
LANDSCAPING PLAN
Sheet No.
C5.00
GRAPHIC SCALE
ISSUED FOR PERMITTING 60 30 0 60
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1130 of 1174
Page 1131
Land Surveying
Environmental
Architecture
Engineering
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
7/17/2026
615
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
PROVIDE AND INSTALL LAWN SEED MIX FOR ALL
DISTURBED AREA UNLESS OTHERWISE NOTED (TYP.)
CAUTION
SHEET 5.01 SHEET 5.02
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
E
Xref (s): ; XY240182401 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XL2401824-10 ; XO2401824-01 ; XC2401824-10 ; KM2401824-KeyMap
CAUTION
CAUTION
N U
CAUTION
CAUTION
VE
A
DN
DN
D E
Desc.
SHEET 5.03 SHEET 5.04
L A
CAUTION
S
CAUTION
CAUTION
REVISIONS
Date
KEY MAP
No.
Designed J.C.W.
Drawn C.B.F.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-50.DWG.C5.01 24X36 30SC.
Reviewed D.J.C.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-50
Title
LANDSCAPING PLAN
Sheet No.
C5.01
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1131 of 1174
Page 1132
Land Surveying
Environmental
Architecture
Engineering
610
605
STOP
605 355 Research Parkway
Meriden, CT 06450
(203) 630-1406
STOP
RESTAURANT 2,380 SF
605
605
FUTURE DRIVE-THRU NE I
RETAIL SE I NV 606
NE I SW NV 606 .08
RIM NV 608 PVC 2,925 G.S.F. PVC RIM INV 60 .18
SAN 612.95 .73 8" S @ 0.5 8" S @ 0.5 SAN 613.17 6.18 610
615
MH
11 189 DR-35 0% FUTURE 301 DR-35 0% MH
9
LF
LF 7/17/2026
STOP
615
615
615 615 615
NE I
SW NV 607
615 RIM INV 60 .69 615
615 615
SAN 613.26 7.79 615
MH
10
615
615
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
RESTAURANT 2,380 SF
PVC FUTURE DRIVE-THRU
8" S @ 0.5
398 DR-35 0%
LF
PROVIDE AND INSTALL LAWN SEED MIX FOR ALL
DISTURBED AREA UNLESS OTHERWISE NOTED (TYP.)
CAUTION
CAUTION
CAUTION
CAUTION
SHEET 5.01 SHEET 5.02
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
Xref (s): ; XY240182401 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XL2401824-10 ; XO2401824-01 ; XC2401824-10 ; KM2401824-KeyMap
CAUTION
CAUTION
WV
CAUTION
CAUTION
DN
DN
Desc.
SHEET 5.03 SHEET 5.04
CAUTION
CAUTION
CAUTION
CAUTION
REVISIONS
CAUTION
CAUTION
Date
CAUTION
CAUTION
KEY MAP
No.
Designed J.C.W.
Drawn C.B.F.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-50.DWG.C5.02 24X36 30SC.
Reviewed D.J.C.
NW Scale 1"=30'
INV
RIM 608.1 Project No. 2401824
Date 07/17/2026
SAN 615.15 7
MH CAD File:
12 C2401824-50
Title
LANDSCAPING PLAN
Sheet No.
C5.02
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1132 of 1174
Page 1133
Land Surveying
Environmental
Architecture
Engineering
355 Research Parkway
WV Meriden, CT 06450
(203) 630-1406
PROVIDE AND INSTALL LAWN SEED MIX FOR ALL
DISTURBED AREA UNLESS OTHERWISE NOTED (TYP.)
7/17/2026
CAUTION
WV
CAUTION
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
216 PARKING SPACES
CAUTION
CAUTION
RID
SHEET 5.01 SHEET 5.02
GE
ROA
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
D
Xref (s): ; XY240182401 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XL2401824-10 ; XO2401824-01 ; XC2401824-10 ; KM2401824-KeyMap
CAUTION
CAUTION
CAUTION
CAUTION
DN
DN
Desc.
SHEET 5.03 SHEET 5.04
REVISIONS
Date
KEY MAP
No.
Designed J.C.W.
PROVIDE AND INSTALL LAWN SEED MIX FOR ALL
DISTURBED AREA UNLESS OTHERWISE NOTED (TYP.) Drawn C.B.F.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-50.DWG.C5.03 24X36 30SC.
Reviewed
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-50
Title
LANDSCAPING PLAN
Sheet No.
C5.03
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1133 of 1174
Page 1134
Land Surveying
Environmental
Architecture
Engineering
NW
INV
RIM 608.1
SAN 615.15 7
MH
12
355 Research Parkway
WV WV Meriden, CT 06450
(203) 630-1406
596 PARKING SPACES
7/17/2026
COSTCO WHOLESALE
±18K S.F. MDO
WV
WEST SENECA, NEW YORK
SLADE AVENUE
FFE = ±620.60
158K PROTO
812 PARKING SPACES
SHEET 5.01 SHEET 5.02
DN
DN
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
Xref (s): ; XY240182401 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XL2401824-10 ; XO2401824-01 ; XC2401824-10 ; KM2401824-KeyMap
CAUTION
CAUTION
CAUTION
CAUTION
DN
DN
Desc.
SHEET 5.03 SHEET 5.04
REVISIONS
WV
Date
KEY MAP
No.
Designed J.C.W.
Drawn C.B.F.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-50.DWG.C5.04 24X36 30SC.
Reviewed D.J.C.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-50
Title
LANDSCAPING PLAN
Sheet No.
C5.04
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1134 of 1174
Page 1135
Land Surveying
LANDSCAPE NOTES
Environmental
Architecture
Engineering
°
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
SHRUB PLANTING
N.T.S
7/17/2026
3X ROOT BALL
TOP DIAMETER
60°
(TYP) D D
D D
D D
COSTCO WHOLESALE
D
WEST SENECA, NEW YORK
SLADE AVENUE
SPACING AS SPECIFIED
DECIDUOUS TREE PLANTING
” N.T.S
GROUNDCOVER PLANTING
°
N.T.S
Xref (s): ; XY240182401 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XL2401824-10 ; XO2401824-01 ; XC2401824-10 ; KM2401824-KeyMap
PLANTING SOIL TO
MINIMUM DEPTH OF ROOTBALL
3X ROOT BALL
TOP DIAMETER
Desc.
REVISIONS
DateNo.
Designed J.C.W.
Drawn C.B.F.
EVERGREEN TREE PLANTING
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-50.DWG.C5.100 24X36 NTS.
Reviewed D.J.C.
Scale NTS
N.T.S Project No. 2401824
Date 01/29/2025
ALUMINUM EDGING DETAIL CAD File:
C2401824-50
N.T.S
Title
LANDSCAPING NOTES
SEED MIX NOTES AND DETAILS
Sheet No.
ISSUED FOR PERMITTING C5.100
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1135 of 1174
Page 1136
Land Surveying
Environmental
STOP
Architecture
Engineering
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY PSI
610
605
STOP
605
STOP
SHEET C5.51 RESTAURANT 2,380 SF
SHEET C5.52
605
355 Research Parkway
605
FUTURE DRIVE-THRU RETAIL
Meriden, CT 06450
2,925 G.S.F. (203) 630-1406
610
615
FUTURE
STOP
615
615
615 615 615
615 615 615 615
615
615
615
615
SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY 7/17/2026
RESTAURANT 2,380 SF
FUTURE DRIVE-THRU
CAUTION
CAUTION
CAUTION
CAUTION
U E
E N
AV
COSTCO WHOLESALE
E
WEST SENECA, NEW YORK
AD
WV
SYMBOL MANUFACTURER/MODEL QTY
M
L
SLADE AVENUE
C
S
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
WV WV
596 PARKING SPACES
ZONE HEAD TYPE GPM
CAUTION
WV
RID
CAUTION
±18K S.F. MDO
WV
GE
C
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XL2401824-10 ; XO2401824-01 ; XL2401824-20 ; KM2401824-KeyMap
M
POC
216 PARKING SPACES
FFE = ±620.60
ROA
CAUTION
158K PROTO
812 PARKING SPACES
CAUTION
D
SHEET C5.53 SHEET C5.54 DN
Desc.
DN
REVISIONS
DateNo.
WV Designed J.C.W.
Drawn C.B.F.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-55.DWG.C5.50 24X36 60SC.
Reviewed D.J.C.
Scale 1"=60'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-55
Title
OVERALL IRRIGATION
PLAN
Sheet No.
C5.50
GRAPHIC SCALE
ISSUED FOR PERMITTING 60 30 0 60
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1136 of 1174
Page 1137
Land Surveying
Environmental
Architecture
Engineering
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
7/17/2026
615
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
CAUTION
SHEET 5.51 SHEET 5.52
CAUTION
CAUTION
CAUTION
CAUTION
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XL2401824-10 ; XO2401824-01 ; XL2401824-20 ; KM2401824-KeyMap
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
U E
N
CAUTION
CAUTION
CAUTION
V E
A
DN
DN
DE
Desc.
SHEET 5.53 SHEET 5.54
L A
CAUTION
S
CAUTION
CAUTION
REVISIONS
Date
KEY MAP
No.
Designed J.C.W.
Drawn C.B.F.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-55.DWG.C5.51 24X36 30SC.
Reviewed D.J.C.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-55
Title
IRRIGATION PLAN
Sheet No.
C5.51
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1137 of 1174
Page 1138
Land Surveying
Environmental
Architecture
Engineering
610
605
STOP
605 355 Research Parkway
Meriden, CT 06450
(203) 630-1406
STOP
RESTAURANT 2,380 SF
605
605
FUTURE DRIVE-THRU RETAIL
2,925 G.S.F.
610
615
FUTURE
7/17/2026
STOP
615
615
615 615 615
615 615 615 615
615
615
615
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
RESTAURANT 2,380 SF
FUTURE DRIVE-THRU
CAUTION
CAUTION
CAUTION
CAUTION
SHEET 5.51 SHEET 5.52
CAUTION
CAUTION
CAUTION
CAUTION
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XL2401824-10 ; XO2401824-01 ; XL2401824-20 ; KM2401824-KeyMap
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
WV
CAUTION
CAUTION
DN
DN
Desc.
SHEET 5.53 SHEET 5.54
CAUTION
CAUTION
CAUTION
CAUTION
REVISIONS
CAUTION
CAUTION
Date
CAUTION
CAUTION
KEY MAP
No.
Designed J.C.W.
Drawn C.B.F.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-55.DWG.C5.52 24X36 30SC.
Reviewed D.J.C.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-55
Title
IRRIGATION PLAN
Sheet No.
C5.52
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1138 of 1174
Page 1139
Land Surveying
Environmental
Architecture
Engineering
355 Research Parkway
WV Meriden, CT 06450
(203) 630-1406
7/17/2026
CAUTION
WV
CAUTION
COSTCO WHOLESALE
WEST SENECA, NEW YORK
SLADE AVENUE
216 PARKING SPACES
CAUTION
CAUTION
RID
SHEET 5.51 SHEET 5.52
GE
ROA
CAUTION
CAUTION
CAUTION
CAUTION
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XL2401824-10 ; XO2401824-01 ; XL2401824-20 ; KM2401824-KeyMap
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
D
CAUTION
CAUTION
CAUTION
CAUTION
DN
DN
Desc.
SHEET 5.53 SHEET 5.54
REVISIONS
Date
KEY MAP
No.
Designed J.C.W.
Drawn C.B.F.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-55.DWG.C5.53 24X36 30SC.
Reviewed D.J.C.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-55
Title
IRRIGATION PLAN
Sheet No.
C5.53
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1139 of 1174
Page 1140
Land Surveying
Environmental
Architecture
Engineering
355 Research Parkway
WV WV Meriden, CT 06450
(203) 630-1406
596 PARKING SPACES
7/17/2026
COSTCO WHOLESALE
±18K S.F. MDO
WV
WEST SENECA, NEW YORK
SLADE AVENUE
C
M
POC
FFE = ±620.60
158K PROTO
812 PARKING SPACES
SHEET 5.51 SHEET 5.52
DN
DN
CAUTION
CAUTION
CAUTION
CAUTION
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XL2401824-10 ; XO2401824-01 ; XL2401824-20 ; KM2401824-KeyMap
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
CAUTION
DN
DN
Desc.
SHEET 5.53 SHEET 5.54
REVISIONS
WV
Date
KEY MAP
No.
Designed J.C.W.
Drawn C.B.F.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-55.DWG.C5.54 24X36 30SC.
Reviewed D.J.C.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-55
Title
IRRIGATION PLAN
Sheet No.
C5.54
GRAPHIC SCALE
ISSUED FOR PERMITTING 30 15 0 30
NOT RELEASED FOR CONSTRUCTION SCALE IN FEET
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1140 of 1174
Page 1141
Land Surveying
Environmental
IRRIGATION PLAN NOTES (COSTCO STANDARDS)
Architecture
Engineering
–
355 Research Parkway
Meriden, CT 06450
(203) 630-1406
B.
7/17/2026
’
COSTCO WHOLESALE
WEST SENECA, NEW YORK
’
SLADE AVENUE
IRRIGATION PLAN NOTES (GENERAL)
Xref (s): ; XY240182401 ; XC2401824-10 ; XB2401824-00 ; XC2401824-20 ; XC2401824-21 ; XC2401824-30 ; XL2401824-10 ; XO2401824-01 ; XL2401824-20 ; KM2401824-KeyMap
Desc.
REVISIONS
DateNo.
Designed J.C.W.
Drawn C.B.F.
Reviewed D.J.C.
7/17/2026, JLYNN, G:\JOBS24\18\2401824\DWG\C2401824-55.DWG.C5.55 24X36 NTS.
Scale 1"=30'
Project No. 2401824
Date 07/17/2026
CAD File:
C2401824-55
Title
IRRIGATION NOTES
Sheet No.
ISSUED FOR PERMITTING C5.55
NOT RELEASED FOR CONSTRUCTION
C 2026 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.
Page 1141 of 1174
Page 1142
Page 1142 of 1174
Page 1143
STORMWATER MANAGEMENT REPORT
For the proposed:
Proposed Development
Slade Avenue
West Seneca, New York
Prepared for:
Costco Wholesale
Issued: July 17, 2026
PREPARED BY
BL Companies
355 Research Parkway
Meriden, CT 06450
07/17/2016
Page 1143 of 1174
Page 1144
Stormwater Management Report July 2026
Proposed Development
West Seneca, NY
TABLE OF CONTENTS
EXECUTIVE SUMMARY .............................................................................................................................. 1
1.0 SITE INFORMATION ...................................................................................................................... 2
1.1 Site Conditions ................................................................................................................................ 2
1.2 NATURAL RESOURCES ..................................................................................................................... 3
1.3 RECEIVING SURFACE WATERS ........................................................................................................ 3
1.4 FEMA FLOODPLAIN ......................................................................................................................... 4
2.0 STORMWATER MANAGEMENT STANDARDS AND PERFORMANCE CRITERIA ........................... 5
2.0 UTILITY CONNECTIONS ................................................................................................................ 6
3.0 SITE CONSTRUCTION AND EROSION CONTROLS ...................................................................... 7
4.0 CONCLUSIONS & RECOMMENDATION ...................................................................................... 8
-ii- 2401824
Page 1144 of 1174
Page 1145
Stormwater Management Report July 2026
Proposed Development
West Seneca, NY
APPENDICES
Appendix A – Figures and Supporting Documentation
Figure 1 – Location Map
Figure 2 – FEMA Map
Figure 3 – NRCS Soil Map
NOAA Atlas 14 Storm Data (Depth)
NOAA Atlas 14 Storm Data (Intensity)
Appendix B – Conveyance Modeling Results
-iii- 2401824
Page 1145 of 1174
Page 1146
Stormwater Management Report July 2026
Proposed Development
West Seneca, NY
EXECUTIVE SUMMARY
The proposed Costco Project includes the redevelopment of an existing parcel located
northeast of the intersection of Slade Avenue and Ridge Road in the City of West Seneca, Erie
County, New York. The Project consists of the construction of an approximately 187,050-square-
foot retail warehouse building and a 16-pump fuel facility providing 32 fueling positions.
The proposed development will also include associated parking facilities, utility infrastructure,
stormwater management facilities, and landscaping improvements. The Project is located within
the West Seneca Exchange master-planned development and will utilize the stormwater
quantity and quality controls proposed as part of the overall master development. The Project
parcel encompasses approximately 787,828 square feet (18.10 acres) of the 55.57-acre master
development area. The total limit of disturbance required to complete the Project is
approximately 19.14 acres, including off-site roadway improvements.
The Costco site improvements have been designed in coordination with Carmina Wood Design,
the Engineer of Record for the master development. Stormwater runoff from the Costco parcel
will be conveyed to and managed within a shared development stormwater basin. A
comprehensive stormwater analysis for the overall development is included in the Carmina
Wood Design Engineer's Report. BL Companies and Carmina Wood Design have coordinated
the stormwater conveyance design for the Costco Project to ensure compliance with all
applicable regulatory requirements and design standards.
Utility services for the Project will be provided through a combination of public and private utility
infrastructure. Water demand and sanitary sewer analyses are included in the Carmina Wood
Design Engineer's Report. BL Companies and Carmina Wood Design have worked
collaboratively to coordinate utility demands and verify that sufficient capacity is available to
serve the proposed development.
This report, in conjunction with the BL Companies design plans and supporting documentation
prepared by Carmina Wood Design, provides a detailed engineering summary of the proposed
site's functionality and demonstrates compliance with all applicable local and state regulations,
standards, and design requirements.
[Type here] -1- 2401824
Page 1146 of 1174
Page 1147
Stormwater Management Report July 2026
Proposed Development
West Seneca, NY
1.0 SITE INFORMATION
1.1 SITE CONDITIONS
The Project parcel is located northeast of the intersection of Slade Avenue and Ridge Road in
the City of West Seneca, Erie County, New York. The existing site is predominantly comprised of a
vacant building pad and associated parking areas remaining from a previous development.
Under existing conditions, the majority of the site consists of gently sloping terrain that conveys
stormwater runoff to an existing closed drainage system connected to the stormwater
infrastructure serving developments located northeast of the Project site. Existing stormwater
swales within the former building pad area provide additional conveyance to the closed
drainage system. Steeper grades are present along the site's frontage on Slade Avenue and
Ridge Road, accommodating approximately 30 feet of elevation change between the
roadway surfaces and the developable portions of the site. Within the proposed development
limits, topographic variation is generally moderate, with elevations ranging from approximately
624 feet in the southwest portion of the site to 615 feet in the northwest portion.
Off-site runoff enters the Project site from multiple sources, including flow originating at the top of
curb along Ridge Road and Slade Avenue, as well as runoff conveyed from the existing railroad
corridor located east of the site.
The proposed development will include construction of the retail warehouse building, fuel
facility, paved parking areas, landscaped areas, pedestrian sidewalks, site utilities, and a
stormwater management system. Development of the site will require demolition and removal of
existing utility infrastructure, pavement, landscaping, hardscape features, and other site
improvements, as well as clearing and grubbing of existing vegetated areas within the limits of
disturbance.
1.1.1 SITE SOILS
The soils in the area of the Property are classified by United States Department of Agriculture
Natural Resources Conservation Service and consist primarily of type “B”, “C” and “D” rated
soils, with “D” rated soils in areas of urban land and wetlands. Please refer to Appendix A, Figure
3: NRCS Soil Survey Map with Hydrologic Soil Group Data, for soils and their classifications in the
project area.
[Type here] -2- 2401824
Page 1147 of 1174
Page 1148
Stormwater Management Report July 2026
Proposed Development
West Seneca, NY
Soils located within the project area from the soil report are as follows:
Map Unit Hydrologic Soil
Map Unit Name
Symbol Group Rating
RgA Rhinebeck Silt Loam, 0 to 3 Percent Slopes C/D
NfA Niagara Silt Loam, 0 to 3 Precent Slopes C/D
Ud Urban Land Unavailable
1.1.2 EXISTING GEOTECHNICAL FINDINGS
A pre-development site characterization and assessment of soil and geology of the site was
conducted by Whitestone Associates Engineering & Geology on August 8, 2025.
The geotechnical report indicates that the site generally consists of topsoil or asphaltic concrete
overlaying existing fill between 2 feet and 13 feet deep, which is underlain by a lacustrine
deposit (generally silt and clay), itself underlain by glacial till, then bedrock.
The full Geotechnical Report can be provided upon request.
1.2 NATURAL RESOURCES
ENVIRONMENTAL CONCERNS
Based on the preliminary environmental review performed by Terracon, the Project Site and
adjacent areas are identified as having a high likelihood of potential environmental concerns.
These findings are consistent with historical use of the site and adjacent property.
ENDANGERED AND THREATENED SPECIES
Based on information accessed from The New York State Department of Environmental
Conservation’s (NY DEC) Natural Heritage Program database, the Project Site does not fall within
the mapped habitat zone for any endangered species.
1.3 RECEIVING SURFACE WATERS
The Project Site falls within the Cazenovia Creek-Buffalo River watershed which is not listed as
impaired within the New York State’s 2020/2022 Section 303(d) list. There are no established Total
Maximum Daily Loads (TMDLs) for this receiving water.
[Type here] -3- 2401824
Page 1148 of 1174
Page 1149
Stormwater Management Report July 2026
Proposed Development
West Seneca, NY
1.4 FEMA FLOODPLAIN
The site is not located in a FEMA floodplain. Per the FEMA Flood Insurance Rate Map Numbers
36029C0333H for Erie County, New York, map effective date: June, 7, 2019 the site resides inside
Zone X (areas determined to be outside the 0.2% annual chance floodplain).
Flood Insurance Rate Maps are included in Appendix A for reference.
[Type here] -4- 2401824
Page 1149 of 1174
Page 1150
Stormwater Management Report July 2026
Proposed Development
West Seneca, NY
2.0 STORMWATER MANAGEMENT STANDARDS AND PERFORMANCE CRITERIA
The proposed stormwater management system has been designed in general conformance
with the current Town of West Seneca regulations and the New York State Stormwater
Management Design Manual.
The overall stormwater management system for the development has been analyzed by
Carmina Wood Design, and the results are documented in the Engineer's Report. BL Companies
provided drainage patterns, drainage area delineations, and impervious coverage data to
support the stormwater modeling. The proposed site has been designed to maintain existing
drainage patterns and avoid adverse impacts to adjacent properties.
The New York State Department of Environmental Conservation (NYSDEC) Stormwater
Management Design Manual identifies five primary stormwater management criteria that must
be addressed during project design: Water Quality, Runoff Reduction Volume, Channel
Protection, Overbank Flood Protection, and Extreme Flood Protection. Because the proposed
stormwater system serves as a component of the larger master-planned stormwater
management system, compliance with these design criteria is addressed within the Master Plan
Stormwater Management Report.
The proposed storm drainage system has been sized to convey the 25-year design storm to the
respective discharge points without ponding or hydraulic surcharge above catch basin or
manhole grate elevations. Rainfall intensities were developed using the applicable NOAA
precipitation data. A minimum pipe diameter of 12 inches is proposed throughout the Costco
project area.
Runoff coefficients for each drainage area were calculated as weighted averages based on
the proportion of impervious and pervious surfaces contributing runoff. Impervious surfaces,
including asphalt pavement, concrete pavement, and building roof areas, were assigned a
Rational Method runoff coefficient (C-value) of 0.90. Pervious surfaces, including landscaped
and lawn areas, were assigned a runoff coefficient of 0.30.
Tailwater elevations at stormwater management facilities and flared end sections were
established based on the computed 25-year design storm water surface elevation within the
receiving basin to which each outlet discharges.
The proposed storm drainage system was modeled using StormCAD Version 8i (Bentley Systems,
formerly Haestad Methods) utilizing the Rational Method. Supporting hydraulic calculations are
provided in Appendix B.
[Type here] -5- 2401824
Page 1150 of 1174
Page 1151
Stormwater Management Report July 2026
Proposed Development
West Seneca, NY
2.0 UTILITY CONNECTIONS
The proposed Costco development will be served by a combination of public and private utility
infrastructure. Utility capacity, service connections, and overall coordination have been
completed in conjunction with the respective utility providers and Carmina Wood Design.
Sanitary sewer service will be provided through the existing on-site private sewer system. New 8-
inch sanitary sewer laterals will be installed to serve the proposed Costco building. The private
sewer collection system has been sized to accommodate the projected peak sanitary flows
generated by the development. The shared private sewer system ultimately discharges to the
municipal public sanitary sewer system.
Domestic water and fire protection service will be provided from an existing water service stub
located along the southern portion of the site adjacent to Ridge Road. Hydraulic modeling has
been completed to verify that the proposed system can satisfy both domestic water demands
and required fire flow criteria. The proposed water distribution system will consist of 10-inch, 12-
inch, and 3-inch ductile iron water mains. All water system components and appurtenances will
be designed and constructed in accordance with applicable municipal standards and
specifications.
Electrical, natural gas, and telecommunications services have been coordinated with the
respective utility providers. Final service routing, connection points, and utility layouts will be
finalized as the project progresses through final design and utility permitting.
[Type here] -6- 2401824
Page 1151 of 1174
Page 1152
Stormwater Management Report July 2026
Proposed Development
West Seneca, NY
3.0 SITE CONSTRUCTION AND EROSION CONTROLS
The proposed erosion and sediment control plan will be implemented in two phases throughout
construction.
Phase 1 consists of installing the initial perimeter erosion and sediment control measures prior to
the commencement of any earth-disturbing activities. These measures include filter socks at
existing storm drainage inlets, stabilized rock construction entrances, and silt fence installed
around the limits of disturbance to prevent sediment from leaving the project site.
During Phase 2, the perimeter erosion and sediment control measures and stabilized
construction entrances will remain in place throughout construction. All newly constructed storm
drainage inlets will be protected with approved inlet protection devices until the contributing
drainage areas have been permanently stabilized. Areas that have reached final grade shall be
promptly stabilized with a minimum of six (6) inches of topsoil, followed by seeding and mulch.
Slopes steeper than 3H:1V shall be stabilized with wildlife-friendly erosion control matting
composed of all-natural materials with no photodegradable synthetic components prior to the
application of seed and mulch.
Topsoil stripped during construction shall be stockpiled on-site for reuse. All topsoil stockpiles shall
be temporarily stabilized with seed and surrounded by filter socks or other approved sediment
control measures to minimize erosion and prevent off-site sediment transport.
Any dewatering associated with trench excavation, stormwater management facilities, or other
construction activities shall be conducted in a manner that prevents sediment discharge and
avoids the creation of accelerated erosion.
Throughout construction, all erosion and sediment control best management practices (BMPs)
shall be inspected at least once per week and after each significant rainfall event. Any
damaged or ineffective BMPs shall be repaired, replaced, or supplemented within 24 hours of
the inspection or rainfall event to maintain their effectiveness.
Refer to the project plans for the complete construction sequence and erosion and sediment
control requirements.
[Type here] -7- 2401824
Page 1152 of 1174
Page 1153
Stormwater Management Report July 2026
Proposed Development
West Seneca, NY
4.0 CONCLUSIONS & RECOMMENDATION
With the implementation of the proposed stormwater management system for this project, in
conjunction with the master-planned stormwater management system constructed as part of
the overall development, the proposed project will not result in adverse impacts to on-site
conditions, downstream properties, or off-site storm drainage systems. The combined stormwater
management system has been designed to mitigate post-development peak runoff rates in
accordance with the project design criteria. The on-site storm drainage collection system has
been sized to convey the 25-year design storm without ponding or hydraulic surcharge above
catch basin or manhole grate elevations.
This report has been prepared to supplement the accompanying project plans and to provide
the technical basis for the stormwater management design presented herein. Based on the
analyses performed and the proposed design, it is our opinion that the stormwater management
system has been designed in general conformance with the applicable requirements of the
Town of West Seneca and the New York State Stormwater Management Design Manual.
[Type here] -8- 2401824
Page 1153 of 1174
Page 1154
Stormwater Management Report July 2026
Proposed Development
West Seneca, NY
APPENDIX A
FIGURES AND SUPPORTING DOCUMENTATION
[Type here] 2401824
Page 1154 of 1174
Page 1155
A
NEC
O
FAL CENTER RD
T SE
BU F
SE
NE
WES
CA
ST
OR
CH
AR
SLADE AVE
DP
AR
INT
KR
D
ER S
T AT
E 90
SITE LOCATION
RIDGE RD
WEST SENECA
LACKAWANA
4/20/2026, ACROWLEY, G:\JOBS24\18\2401824\DWG\EXH2401824-01-FIG1.DWG.FIG1 8.5X11 1000SC.
Designed A.J.C.
Architecture Drawn A.J.C.
COSTCO
Engineering
Environmental
Land Surveying SLADE AVENUE
Reviewed
Scale
Project No.
J.A.B.
1"=1000'
2401824
FIGURE 1
Date 05/13/2026 LOCATION MAP
WEST SENECA, NEW YORK CAD File:
EXH2401824-01-FIG1
Page 1155 of 1174
Page 1156
APPROXIMATE
SITE LOCATION
Page 1156 of 1174
Page 1157
N
atio
nalF
loo
dHa
zardL
ayerF
IRMe
tte L
ege
n d
7
8°4
7'2
8"W4
2°5
0'8
"N S
EEF
ISR
EPOR
TFORD
ETAIL
E DL
E G
ENDA
N DIN
DEXM
APF
O RF
IRMP
ANE
LLAY
O U
T
W
ith
outB
aseF
loo
dEle
vatio
n(B
FE)
Z
oneA,V
,A9
9
W
ithB
FEo
rDe
pthZoneAE,A
O,A
H ,V
E,A
R
S
P E
C IA
LFL
O O
D
HAZARDAREAS R
egu
lato
ryF
loo
dwa
y
0.2
% AnnualC h
anceFloodHa zard,Areas
o
f1 % an nualchan
ceflo
odw itha verage
d
e pthlessthanonefootorwithd rain
age
a
rea soflessthanonesquarem ileZoneX
F
u tureC o nditions1 % A nnual
Chan ceF loodH a za rdZoneX
Areaw ithR ed uce dF loodRiskd ueto
O
TH E
RA R
EASO F L
e vee .S e eN o tes.ZoneX
F
LO ODHAZ
A R
D Areaw ithF lo odR iskd uetoL eve
eZoneD
N
OSC
R E
ENA
reao
fMin
ima
lFlo
odH
aza
rd ZoneX
E
ffe
ctiveL
O M
Rs
O
THE
RARE
A S A
reao
fUn
dete
rmin
edF
loo
dHa
zardZoneD
G
ENERAL Cha
nn e
l,Culvert,orSto
rm S
ewe
r
S
TRUC
TURE
S L
evee,Dik
e,o rF lo
o d
w all
2
0.2
B C
rossS
ectio
nsw
ith1
% A
nnu
alC
han
ce
1
7.5 W
ate
rSu
rfa
ceE
leva
tio
n
8 Co asta lTra n
se ct
Ba seF lo odE levatio
nL in
e(B
FE)
Lim ito fS tudy
Jurisdictio nB o
u nd ary
C
o astalTran sectBase
lin
e
OTHE
R Pro
fileBa selin
e
F
E A
TURES Hydrogra
p h
icF eatu
re
D
igita
lDa
taA
vaila
ble
M
APP
ANE
LS
T
h epind
N
oD
U
nm
ig
a
p
isp
ita
pe
d
la
lD
ye
a
taA
do
vaila
nth
b
em
le
apisa na
ppro
Ü
ximate
poin
tselectedb yth
eu seranddoesnotrepre
sent
ana u
thorita
tiveprope
rtylo
catio
n.
T
h ism a pcompliesw ithF
E M A'ssta n
dardsfo rth
eu seof
digitalfloodma p sifitisno tvoida sdescribe
db elo
w .
T
h eb ase mapsh ow nco mpliesw ithFEMA 'sbasema p
accu racystanda rds
T hefloo dh a
zardinform atio nisd erive dd irectlyfrom the
a uth
o ritativeN F
H Lw e bse rvicesp rovid edb yF EM A.Thism ap
w ase xp ortedo n7/ 2
5 /202 4a t9:46A Ma n dd oe sn
o t
refle
ctch a ngesora m e ndm entssu b seq ue n
ttoth isdatea n
d
tim e.T heN FHLan de ffe
ctivein fo
rm ationm a ych angeo r
b ecom esu persededb yne wd atao ve rtim e.
Thism apim a g
eisvo idifth eo neorm oreo fthefollowin gm ap
elem e
n tsdon ota ppe ar:ba se mapim ag ery,floodzo nela b els,
legend,scaleb ar,ma pcre a tiondate ,co m m un
ityid e
ntifiers,
FIRM pa nelnum b e
r,a ndF IR M effectived a te.M apim ag esfo r
7
8°4
6'5
1"W4
2°4
9'4
1"N
Fee
t 1
:6,0
00 unm app edan du nm o dernize dareasca n n otb eu sedfo r
0 2
50 5
00 1
,00
0 1
,50
0 2
,00
0 regula
to rypurposes.
Page 1157 of 1174
B
ase
m a
pIm
age
ryS
ourc
e :U
SGSN
atio
nalM
ap2
023
Page 1158
Hydrologic Soil Group—Erie County, New York
78° 47' 28'' W
78° 46' 52'' W
680600 680700 680800 680900 681000 681100 681200 681300
42° 50' 8'' N 42° 50' 8'' N
4744900
4744900
4744800
4744800
4744700
4744700
4744600
4744600
4744500
4744500
4744400
4744400
4744300
4744300
4744200
4744200
4744100
4744100
4744000
4744000
4743900
4743900
Soil Map may not be valid at this scale.
42° 49' 33'' N 42° 49' 33'' N
680600 680700 680800 680900 681000 681100 681200 681300
78° 47' 28'' W
78° 46' 52'' W
Map Scale: 1:5,300 if printed on A portrait (8.5" x 11") sheet.
Meters
N 0 50 100 200 300
Feet
0 250 500 1000 1500
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84
Natural Resources Web Soil Survey 4/20/2026
Conservation Service National Cooperative Soil Survey Page 1 of 4
Page 1158 of 1174
Page 1159
Hydrologic Soil Group—Erie County, New York
MAP LEGEND MAP INFORMATION
Area of Interest (AOI) C The soil surveys that comprise your AOI were mapped at
Area of Interest (AOI) 1:15,800.
C/D
Soils Warning: Soil Map may not be valid at this scale.
D
Soil Rating Polygons
Not rated or not available Enlargement of maps beyond the scale of mapping can cause
A
misunderstanding of the detail of mapping and accuracy of soil
A/D Water Features line placement. The maps do not show the small areas of
Streams and Canals contrasting soils that could have been shown at a more detailed
B scale.
Transportation
B/D
Rails Please rely on the bar scale on each map sheet for map
C measurements.
Interstate Highways
C/D Source of Map: Natural Resources Conservation Service
US Routes
D
Web Soil Survey URL:
Major Roads Coordinate System: Web Mercator (EPSG:3857)
Not rated or not available
Local Roads Maps from the Web Soil Survey are based on the Web Mercator
Soil Rating Lines projection, which preserves direction and shape but distorts
Background
A distance and area. A projection that preserves area, such as the
Aerial Photography
Albers equal-area conic projection, should be used if more
A/D accurate calculations of distance or area are required.
B This product is generated from the USDA-NRCS certified data as
B/D
of the version date(s) listed below.
C Soil Survey Area: Erie County, New York
Survey Area Data: Version 25, Sep 4, 2025
C/D
Soil map units are labeled (as space allows) for map scales
D 1:50,000 or larger.
Not rated or not available Date(s) aerial images were photographed: May 13, 2023—May
27, 2023
Soil Rating Points
A The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
A/D imagery displayed on these maps. As a result, some minor
B shifting of map unit boundaries may be evident.
B/D
Natural Resources Web Soil Survey 4/20/2026
Conservation Service National Cooperative Soil Survey Page 2 of 4
Page 1159 of 1174
Page 1160
Hydrologic Soil Group—Erie County, New York
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
Ca Canadice silt loam D 2.2 1.7%
Cc Canandaigua silt loam C/D 0.9 0.7%
CsB Collamer silt loam, 3 to C/D 3.1 2.5%
8 percent slopes
Hm Hamlin silt loam B 0.4 0.3%
NfA Niagara silt loam, 0 to 3 C/D 39.0 30.7%
percent slopes
RgA Rhinebeck silt loam, 0 to C/D 17.9 14.1%
3 percent slopes
RkA Rhinebeck gravelly C/D 5.1 4.0%
loam, 0 to 3 percent
slopes
Te Teel silt loam B/D 2.9 2.3%
Uc Udorthents, smoothed 4.9 3.9%
Ud Urban land 50.7 39.9%
Totals for Area of Interest 127.1 100.0%
Natural Resources Web Soil Survey 4/20/2026
Conservation Service National Cooperative Soil Survey Page 3 of 4
Page 1160 of 1174
Page 1161
Hydrologic Soil Group—Erie County, New York
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Natural Resources Web Soil Survey 4/20/2026
Conservation Service National Cooperative Soil Survey Page 4 of 4
Page 1161 of 1174
Page 1162
01222456789 587
646 65 0 2
644 9!"#!$ %4 &'#"'#($
)5*64(8+4
,-./01234-5678-9:;.
,,-./01234-<6=6
>1?0@>A)B?>?@2@?10CA)D)0B)@?E2@)
6:FG:-H31I2:J-6:FK1:-H:LM/LI2J-9I2N:3M-6OP-Q:013FOJ-R:1M-S1T;:M0UJ-V:M3-<F10NJ-W1M:F-XIMNIO3
YWZZJ-Y:OI/F:M-X3:ON31-631LI23J-6IML31-6;1IF[J-9:1TM:FK
H\]O:^0M:1-_-H\][1:;NI2:M-_-9:;.]`]:31I:M.
>C46a 56
>b&a67 c 4cc464d e746474f+g 4*657hf7if j8
b 64 8 2*6% 4*65he67j
! k 8 !k k 8 ! k 8
k& lmPno"pqkPors lrPm9t"pqPuvs lqPokq"p8tkPrns lqPv(t"pn(Pwns lwPt'w"puPwts ltPm#r"!po#oPxs ltPn+q"p!o+mPus lnPo8xp"o9qPvs lnPv8v!p"o8nPvs lvPw8tp"mkxPrs
8& loPu!r"pm#Purs lmPr!o"p#r(Pwms lmPur"p(q9Pwos lrPq9q"pwPrws lqPxkx"p!tPnvs lqPqkm"p#n'Pvqs lqPn(v"pku#Pors lwPx'r"p9oxPws lwPw#u"pko+mPts ltPx+t"pko'qPqs
8k& loPw8o"p#m(Prxs loPv!o"p!m9Pnts lmPr!x"p#r(Pwqs lmPnx"pq'Pmxs lrPo9q"pw#Prms lrPq9t"p(tPoqs lrPnkw"p8n(Pots lrPukw"p#vPmms lqPr(v"p'uPvus lqPn'w"kpo8oPrs
& loPx8q"p!o+Pwus loPm8t"pkokPuos loPt8x"p+m#Pqws loPv!n"pm9Puos lmPo!v"p#rPtus lmPqx"p!qPmts lmPtx"pkq#Puns lmPn9q"pwPnos lrPx9q"p(t'Pvts lrPrkx"p!n8Pvos
(& lxPtt"#np!oPxms lxPvx"+rp+o!Pmms loPx8m"p!o'Pwns loPm8x"pkoPvts loPr8u"p#m8Prts loPw!q"pmkPnrs loPt!n"p!r+Povs loPn!t"pkr#Ptws loPu!w"p+q+Prus lmPoo"pwPxxs
!&f lxPqo"wkpxP+tmqslxPwx"m(p8xP(nwtslxPtq"m'p+xP8unrs lxPnw"+wpo'Pots lxPv8v"o8po9Pqns lxPu8n"r!po+Pnos loPx8t"p9o9Puus loPo8o"p(mPmus loPm8q"p+mPnts loPr!q"p8r!Pows
&f lxPro"xp'xP+qtmslxPrn"t9p(xPwtmslxPqv"mkp+xP!nmtslxPwt"v'pxP!vtts lxPtt"#qpkoPoxs lxPnr"+rp(o'Pmvs lxPn8u"tpo+Pwxs lxPv8q"x!poPnms lxPu8r"t9pmPxvs loPx8m"p(mPrvs
(&f lxPov"t!p!xPkmnrslxPmm"t!p'xPkrrrslxPmu"opkxP(qrrslxPrq"q9p!xPwovslxPqx"rkp8xPkttmslxPqq"tkp#xP9ntvslxPqv"w(pkxP'uxos lxPwo"o'p9o9Pxqs lxPwn"#rp'oPmts lxPtm"+tp#o!Pqws
8!&f lxPox"v8pxP8owvslxPor"m8p(xPourslxPon"o!pxP'mwxslxPmx"m!p9xP(rxxslxPmr"tpxPrvqslxPmt"mp9xPqqtslxPmv"wp#xP9wmqslxPrx"x9pxPktxrslxPrr"vkp8xP9nrnslxPrn"mkp#xP8vwxs
!9&f lxPxt"wp'xP'xurslxPxn"vp+xPoomslxPxu"u8p8xP+oqrslxPoo"t8px9P8onxslxPor"w8p'xPmonslxPoq"u8p+xP!mwxslxPot"m!p8xP(muqslxPon"x!p9xPkrrnslxPou"o!p+xPqorslxPmo"opx!P#qnns
!&6e lxPxr"up9xP'xwwslxPxq"tpkxP9xtwslxPxw"tp(xP#xvoslxPxt"wp'xP#xuqslxPxn"qp+xPoovslxPxv"o8pxP9orwslxPxv"n8p8xP(ownslxPxu"o8pxP8onuslxPox"m8pkxP9movslxPoo"m8px'P9mwms
&6e lxPxm"upxPkxqoslxPxr"qp9xPxqvslxPxq"op9xP+xwvslxPxq"npkxP(xtnslxPxw"rp(xP(xvrslxPxw"np'xP9xuwslxPxt"mp#xP!ooxslxPxt"qp+xP!omwslxPxn"o8pxP'owoslxPxn"n8p!xPonrs
9&6e lxPxm"qp!xP#xrrslxPxm"npxP!xrvslxPxr"rpxP+xqnslxPxr"np9xPkxwrslxPxq"mpkxPxttslxPxq"wpkxP#xnwslxPxq"vp(xP9xvtslxPxw"xp'xP!xunslxPxw"wp#xPoonslxPxt"xp+xPorrs
'&6e lxPxo"tp8xP+xmrslxPxo"up!xP!xmtslxPxm"mp!xP(xroslxPxm"wpxPxrwslxPxm"vpxP9xqrslxPxr"xpxP#xqvslxPxr"op9xP!xwwslxPxr"mp9xP(xtmslxPxr"wpkxP!xnrslxPxr"npkxP'xvms
8&6e lxPxo"rp8xP(xovslxPxo"wp8xP#xmoslxPxo"vp!xP8xmqslxPxm"xp!xPxmvslxPxm"mp!xP'xrrslxPxm"rpxPxrnslxPxm"qpxPxqrslxPxm"wpxP(xqvslxPxm"np9xPxwtslxPxm"vp9xPxtms
!&6e lxPxx"upx8P8xorslxPxo"xp8xP!xoqslxPxo"mp8xP9xotslxPxo"rp8xP(xovslxPxo"qp8xP#xmmslxPxo"wp!xPxmqslxPxo"tp!xP8xmnslxPxo"tp!xPxroslxPxo"np!xPkxrwslxPxo"vp!xP'xrus
&6e lxPxx"vpxP+xoxslxPxx"vp8xPxomslxPxo"xpx8P8xorslxPxo"opx8PxowslxPxo"mp8xP9xonslxPxo"mp8xP(xouslxPxo"rp8xP'xmmslxPxo"rp8xP#xmqslxPxo"rp!xPxmvslxPxo"qp!xP8xrxs
9k&6e lxPxx"tpxP'xxuslxPxx"npxP#xxuslxPxx"vpxP+xooslxPxx"up8xPxomslxPxx"up8xP!xoqslxPxo"xp8xPxotslxPxo"xp8xP9xonslxPxo"xp8xPkxouslxPxo"opx8P(xmmslxPxo"opx8P'xmqs
(&6e lxPxx"tpxP(xxvslxPxx"tpxP'xxvslxPxx"npxP#xxuslxPxx"npxP+xoxslxPxx"vp8xPxomslxPxx"vpx8P8xorslxPxx"up8xP!xowslxPxx"up8xP!xotslxPxx"up8xPxovslxPxx"up8xP9xmxs
o-H132I;IO:OI/F-y13z03F2T-lH\s-3.OI{:O3.-IF-ONI.-O:^M3-:13-^:.3K-/F-y13z03F2T-:F:MT.I.-/y-;:1OI:M-K01:OI/F-.31I3.-lHV6sP
Y0{^31.-IF-;:13FON3.I.-:13-H\-3.OI{:O3.-:O-M/|31-:FK-0;;31-^/0FK.-/y-ON3-ux}-2/FyIK3F23-IFO31L:MP-SN3-;1/^:^IMIOT-ON:O-;132I;IO:OI/F-y13z03F2T-3.OI{:O3.-ly/1
:-[IL3F-K01:OI/F-:FK-:L31:[3-1320113F23-IFO31L:Ms-|IMM-^3-[13:O31-ON:F-ON3-0;;31-^/0FK-l/1-M3..-ON:F-ON3-M/|31-^/0FKs-I.-w}P-5.OI{:O3.-:O-0;;31-^/0FK.-:13-F/O
2N32U3K-:[:IF.O-;1/^:^M3-{:~I{0{-;132I;IO:OI/F-lH9Hs-3.OI{:O3.-:FK-{:T-^3-NI[N31-ON:F-20113FOMT-L:MIK-H9H-L:M03.P
HM3:.3-13y31-O/-YWZZ-ZOM:.-oq-K/20{3FO-y/1-{/13-IFy/1{:OI/FP
:2U-O/-S/;
>C%6cf65
Page 1162 of 1174
Page 1163
012356768
9
Page 1163 of 1174
Page 1164
012346718494221
0123467184 1
012346718414218
Page 1164 of 1174
Page 1165
/
12234
0
5246
012356768
9 815 566 2
15612121568 25156
1561 15 2
156115 5
15 5!"#1$
8"%& '('
)* 56+,! -)* 56.611-"6
21
Page 1165 of 1174
Page 1166
Stormwater Management Report July 2026
Proposed Development
West Seneca, NY
APPENDIX B
CONVEYANCE MODELING RESULTS
[Type here] 2401824
Page 1166 of 1174
Page 1167
Profile Report
Engineering Profile - CB-200A TO O-2 (C-DAT-2401824-StormCAD-2026-07-14.stsw)
CB-200A
RL-12
Rim: 619.76 ft
RL-16 Invert: 611.89 ft
Invert: 614.26 ft
Invert: 612.77 ft MH-201
CB-200B CB-203 Rim: 619.34 ft
Rim: 617.49 ft Rim: 616.57 ft Invert: 611.45 ft
Invert: 611.62 ft Invert: 610.63 ft
CB-201 MH-200 RL-11
Rim: 616.79 ft Rim: 618.69 ft Invert: 611.54 ft
Invert: 611.29 ft Invert: 610.43 ft RL-10
RL-14 Invert: 611.31 ft
CB-202 CB-205 MH-202
Invert: 612.34 ft CB-204
Rim: 617.31 ft Rim: 615.95 ft Rim: 615.42 ft
RL-13 Rim: 618.19 ft
Invert: 611.03 ft Invert: 607.93 ft Invert: 607.07 ft
620.00 Invert: 612.21 ft Invert: 609.03 ft
O-2
Rim: 611.62 ft
Invert: 608.29 ft
Elevation (ft)
615.00
610.00 P65: 220.1 ft @ 0.005 ft/ft
Circle - 30.0 in HDPE P66 : 172.8 ft @ 0.00 P67: 156.3 ft @
5 ft/ft 0.007 ft/ft
Circle - 36.0 in HDPE Circle - 36.0 in HD
PE
605.00
-0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00
Station (ft)
P58: 17.1 ft @ 0.005 ft/ft
P53: 65.9 ft @ 0.005 ft/ft Circle - 24.0 in HDPE P62: 18.4 ft @ 0.005 ft/ft
Circle - 24.0 in HDPE P64: 55.9 ft @ 0.005 ft/ft
Circle - 12.0 in HDPE P57: 40.8 ft @ 0.005 ft/ft
P61: 70.1 ft @ 0.005 ft/ft Circle - 30.0 in HDPE
P52: 86.2 ft @ 0.019 ft/ft Circle - 18.0 in HDPE
Circle - 24.0 in HDPE P63: 27.5 ft @ 0.005 ft/ft
Circle - 12.0 in P56: 29.0 ft @ 0.005 ft/ft
P60: 64.6 ft @ 0.005 ft/ft Circle - 30.0 in HDPE
Circle - 15.0 in HDPE
P55: 52.1 ft @ 0.005 ft/ft Circle - 24.0 in HDPE
Circle - 15.0 in HDPE P59: 26.0 ft @ 0.005 ft/ft
P54: 51.2 ft @ 0.005 ft/ft Circle - 24.0 in HDPE
Circle - 12.0 in HDPE
StormCAD
C-DAT-2401824-StormCAD-2026-07-14.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.04.00.158]
7/16/2026 76 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755- Page 1 of 1
1666
Page 1167 of 1174
Page 1168
Profile Report
Engineering Profile - CB-213 TO CB-205 (C-DAT-2401824-StormCAD-2026-07-14.stsw)
CB-213
Rim: 616.67 ft CB-211 CB-208
Invert: 611.53 ft Rim: 616.30 ft Rim: 616.33 ft
CB-212
Invert: 608.93 ft Invert: 608.17 ft
Rim: 616.30 ft
Invert: 609.27 ft CB-210 CB-205
Rim: 616.30 ft Rim: 615.95 ft
Invert: 608.59 ft Invert: 607.93 ft
620.00
Elevation (ft)
615.00
610.00
605.00
-0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50
P82: 67.0 ft @ 0.005 ft/ft
Station (ft) Circle - 24.0 in HDPE
P80: 64.0 ft @ 0.005 ft/ft
P78: 66.8 ft @ 0.005 ft/ft Circle - 18.0 in HDPE
Circle - 15.0 in HDPE
P79: 67.2 ft @ 0.005 ft/ft
P77: 52.5 ft @ 0.005 ft/ft
Circle - 18.0 in HDPE
Circle - 12.0 in HDPE
StormCAD
C-DAT-2401824-StormCAD-2026-07-14.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.04.00.158]
7/16/2026 76 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755- Page 1 of 1
1666
Page 1168 of 1174
Page 1169
Profile Report
Engineering Profile - RD-1 TO MH-101 (C-DAT-2401824-StormCAD-2026-07-14.stsw)
RL-6A
RL-2 Invert: 612.40 ft
Invert: 613.10 ft RL-6B
RL-3 Invert: 612.63 ft
Invert: 612.89 ft RL-7
RL-4 Invert: 612.43 ft
Invert: 612.69 ft RL-8A MH-100
RL-5 Invert: 612.25 ft Rim: 619.51 ft
Invert: 612.39 ft RL-8B Invert: 609.78 ft
RD-1
Invert: 614.10 ft Invert: 612.14 ft MH-101
RL-1 Rim: 618.15 ft
Invert: 613.99 ft Invert: 607.94 ft
620.00
Elevation (ft)
615.00
610.00
605.00
-0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50
P2: 42.4 ft @ 0.005 ft/ft P8: 35.9 ft @ 0.005 ft/ft
Circle - 15.0 in HDPE Station (ft)
Circle - 18.0 in HDPE
P1: 57.1 ft @ 0.005 ft/ft P20: 141.8 ft @ 0.005 ft/ft
Circle - 15.0 in HDPE P7: 40.6 ft @ 0.005 ft/ft
Circle - 18.0 in HDPE Circle - 24.0 in HDPE
P12: 22.7 ft @ 0.005 ft/ft
P6: 17.5 ft @ 0.005 ft/ft P10: 72.5 ft @ 0.005 ft/ft
Circle - 10.0 in HDPE
Circle - 18.0 in HDPE Circle - 24.0 in HDPE
P5: 54.5 ft @ 0.005 ft/ft P9: 22.6 ft @ 0.005 ft/ft
Circle - 18.0 in HDPE Circle - 24.0 in HDPE
P4: 59.4 ft @ 0.005 ft/ft
Circle - 18.0 in HDPE
P3: 40.6 ft @ 0.005 ft/ft
Circle - 18.0 in HDPE
StormCAD
C-DAT-2401824-StormCAD-2026-07-14.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.04.00.158]
7/16/2026 76 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755- Page 1 of 1
1666
Page 1169 of 1174
Page 1170
Profile Report
Engineering Profile - CB-117 TO CB-115 (C-DAT-2401824-StormCAD-2026-07-14.stsw)
CB-117
Rim: 617.17 ft
Invert: 609.67 ft
CB-116
Rim: 617.32 ft
Invert: 609.33 ft
CB-115
Rim: 617.44 ft
Invert: 607.50 ft
620.00
Elevation (ft)
615.00
610.00
P43: 74.0 ft @ 0.005 ft/ft
605.00 Circle - 18.0 in HDPE
P42: 67.0 ft @ 0.005 ft/ft
-0+50 0+00 0+50 1+00 1+50 Circle - 18.0 in HDPE
Station (ft)
StormCAD
C-DAT-2401824-StormCAD-2026-07-14.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.04.00.158]
7/16/2026 76 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755- Page 1 of 1
1666
Page 1170 of 1174
Page 1171
Profile Report
Engineering Profile - CB-113B TO CB-115 (C-DAT-2401824-StormCAD-2026-07-14.stsw)
CB-113B
Rim: 618.65 ft CB-114
Invert: 611.40 ft Rim: 617.56 ft
CB-113A Invert: 609.65 ft
Rim: 617.52 ft CB-115
Invert: 612.02 ft Rim: 617.44 ft
Invert: 607.50 ft
620.00
P41: 64.0 ft @ 0.005 ft/ft
Circle - 18.0 in HDPE
Elevation (ft)
615.00
610.00
P40: 74.6 ft @ 0.005 ft/ft
Circle - 18.0 in HDPE
P39: 63.3 ft @ 0.018 ft/ft
605.00 Circle - 15.0 in HDPE
-0+50 0+00 0+50 1+00 1+50 2+00 2+50
Station (ft)
StormCAD
C-DAT-2401824-StormCAD-2026-07-14.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.04.00.158]
7/16/2026 76 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755- Page 1 of 1
1666
Page 1171 of 1174
Page 1172
Profile Report
Engineering Profile - MH-CANOPY MH-106 (C-DAT-2401824-StormCAD-2026-07-14.stsw)
MH-CANOPY
Rim: 615.80 ft
Invert: 610.08 ft
CB-120
Rim: 615.26 ft
Invert: 608.15 ft
620.00 MH-106
Rim: 615.11 ft
Invert: 606.23 ft
P51: 56.0 ft @ 0.020 ft/ft
Elevation (ft)
615.00 Circle - 18.0 in
610.00
605.00 P50: 23.0 ft @ 0.005 ft/ft
Circle - 18.0 in HDPE
-0+50 0+00 0+50 1+00
Station (ft)
StormCAD
C-DAT-2401824-StormCAD-2026-07-14.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.04.00.158]
7/16/2026 76 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755- Page 1 of 1
1666
Page 1172 of 1174
Page 1173
Profile Report
Engineering Profile - CB-100 TO O-1 (C-DAT-2401824-StormCAD-2026-07-14.stsw)
CB-109
CB-106
Rim: 618.63 ft
Rim: 618.85 ft Invert: 610.25 ft
Invert: 611.33 ft
CB-107 CB-110
Rim: 618.66 ft Rim: 618.70 ft MH-102
Invert: 610.94 ft Invert: 609.93 ft Rim: 617.66 ft
CB-105 CB-108 CB-111A Invert: 607.62 ft MH-105
Rim: 619.23 ft Rim: 618.71 ft Rim: 619.02 ft CB-115 Rim: 615.70 ft
Invert: 611.63 ft Invert: 610.62 ft Invert: 609.55 ft Rim: 617.44 ft Invert: 609.26 ft
625.00 MH-101 Invert: 607.50 ft
CB-101 CB-102 CB-118
CB-103 CB-104 CB-112 Rim: 618.15 ft MH-104
Rim: 619.84 ft Rim: 620.03 ft Rim: 618.53 ft Rim: 615.61 ft
Rim: 619.61 ft Rim: 619.85 ft Invert: 607.94 ft Rim: 617.50 ft
Invert: 613.74 ft Invert: 613.33 ft Invert: 606.47 ft
Invert: 612.83 ft Invert: 612.22 ft Invert: 608.42 ft Invert: 610.20 ft
620.00 MH-106
Rim: 615.11 ft
Invert: 606.23 ft
Elevation (ft)
615.00 O-1
Rim: 611.50 ft
Invert: 608.00 ft
P32: 225.2 ft @ 0.005
610.00 ft/ft
P22: 99.6 ft @ 0.005 ft/ft P25: 60.8 ft @ 0.005 ft/ft Circle - 30.0 in HDPE P36B: 188.7 ft @ 0.00
Circle - 15.0 in HDPE Circle - 18.0 in HDPE 5 ft/ft
Circle - 36.0 in P38: 180.6 ft @ 0.005
P21: 81.3 ft @ 0.005 ft/ft P23: 122.4 ft @ 0.005 ft/ft P24: 117.4 ft @ 0.005 ft/ft P30: 76.8 ft @ 0.005 ft/ft P33: 96.2 ft @ 0.005 ft/ft ft/ft
Circle - 42.0 in HDPE
Circle - 12.0 in HDPE Circle - 15.0 in HDPE Circle - 18.0 in HDPE Circle - 24.0 in HDPE Circle - 30.0 in HDPE
605.00
-0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00
P29: 64.0 ft @ 0.005 ft/ft P37: 47.7 ft @ 0.005 ft/ft
Circle - 24.0 in HDPE P36A: 11.1 ft @ 0.005 ft/ft Circle - 42.0 in HDPE
Station (ft)
P28: 74.0 ft @ 0.005 ft/ft
Circle - 36.0 in P36C: 15.3 ft @ 0.005 ft/ft
Circle - 24.0 in HDPE
P35: 23.1 ft @ 0.005 ft/ft Circle - 36.0 in
P27: 64.1 ft @ 0.005 ft/ft Circle - 36.0 in HDPE
Circle - 24.0 in HDPE
P34: 63.8 ft @ 0.005 ft/ft
P26: 77.4 ft @ 0.005 ft/ft Circle - 36.0 in HDPE
Circle - 18.0 in HDPE
StormCAD
C-DAT-2401824-StormCAD-2026-07-14.stsw Bentley Systems, Inc. Haestad Methods Solution Center [10.04.00.158]
7/17/2026 76 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755- Page 1 of 1
1666
Page 1173 of 1174
Page 1174
07/22/26
Seneca Mall Redevelopment
Former Seneca Mall, SE corner of Orchard
Park Rd & Slade Ave 0 Orchard Park Road
Benchmark Streamline, LLC 716-876-0160
4053 Maple Road Amherst, NY 14226
same as applicant
same as applicant
Carmina Wood Design 716-842-3165
80 Silo City Row, Suite 100, Buffalo, NY 14203
143.05-1-27.11, 143.05-1-27.12, 134.17-1-1, 134.17-1-2, 134.17-1-3, 134.17-1-4, 134.17-1-5,
134.17-1-6, 134.17-1-7, 143.05-1-28, 143.05-1-29, 143.05-1-30.1, 143.05-1-32.1, 143.05-1-33
Redevelopment of the site previously occupied by the Seneca Mall to include approximately 500,000 sf of new commercial buildings
(shopping center, retail, restaurant, fast food with drive-thru), the existing Tops Markets will remain. The project will also include a
fueling facility which is accessory to one of the anchor tenants.
56 +/- 56 +/-
Orchard Park Road: 1,385 lf Slade Ave: 2,225 lf Ridge Road: 470 lf
C-2(s) N/A
grocery store, vacant
commercial (shopping center, retail, restaurant, fast
food with drive-thru, fuel facility)
hotel, education, banking, grocery store, dispensary, single family residential
M-1, M-1(s), C-1, C-2, C-2(s), R-60-A, R-65
✔ ✔
Variance for total parking count, potentially other variances. Site Plan Approval, Building Permit
Page 1174 of 1174