Text · page 11 of 12
Read the whole document on one page (all 12 pages, each with its own heading)
REGULAR BOARD MEETING TOWN HALL OCTOBER 21, 2026 7:30 P.M. Town Clerk Quinlan reported on the following: October Connect Life blood drive collected 13 units, helped save 39 local patients. The next drive will be held Tuesday, November 3rd from 2:00 PM to 7:00 PM at the Patchin fire hall rather than at Town Hall. That date is Election Day, Town hall will be closed. Thanked Ms. Pericak for working with the Town Clerk and for her efforts to provide respectable compensation to all appointed and elected personnel. Supervisor Keding reported on the following: Mobile DMV: County Clerk Mickey Kerns will bring the mobile DMV to Town Hall on Friday, October 30th from 10:00 AM to 3:00 PM in the courtroom. The previous visit served about 50 people, compared with a typical 12 to 17, which shows a need in Southern Erie County. Grinder pump failure: Publicly apologized for the grinder pump failure the previous week. Waste water had come up through the floor drains. A replacement pump was installed by a plumber but had been wired improperly, causing a direct short that kept tripping the breaker. Thanked Councilman Penders, who corrected the wiring on short notice and restored the pit and drains to working order. Water Phase 1: Two residential properties remain to be addressed before Water Phase 1 can be closed out. Water Phase 2: Comments have been received from Erie County Water Authority, Erie County Highway, and the Erie County Department of Health. CPL, the Town's engineer, will address them. The Town is awaiting reports from the New York State DEC and the Army Corps of Engineers, and all environmental reviews have been returned. Phase 2 includes a little over 9,000 linear feet of water line. The Town's $5,000,000 application under the Water Infrastructure Improvement Act was denied again despite letters of support from State and Congressional representatives. The Board will continue to apply. Confirmed that Phase 2 includes a water service extending down Boston Colden Road on the south end of town. This will provide a second feed that improves pressure and reduces the risk of losing service throughout Town in a main break. Elevation from the water tank is expected to meet the Erie County Department of Health's 50 PSI minimum for fire protection. The Board will need to decide whether to establish a district allowing residents to connect, or to install a service main that passes homes and allows later connection. More information will be posted on the Town website under Water Projects. Regarding the hill-area of District 2 extension, explained that residents there pay a basic fee of approximately a dollar per month. A feasibility study put the cost to build out that phase at roughly $11,000,000. He said density affects the cost of community services. He noted that residents there may connect to water if the district is built out. Hamburg dispatch: A cost increase for Hamburg dispatch is expected. He will speak with the Hamburg Supervisor the following day and will report at a future Board meeting. Holiday lights: Holiday light project is nearing completion. NYSEG required a pole attachment agreement and fuse disconnects at each pole carrying a decoration. One pole near Cappellino Chevrolet had been missed. Once the