Text · page 46 of 111
Read the whole document on one page (all 111 pages, each with its own heading)
WARNING: LIST OF DRAWINGS These documents and their 6x6 W1.4 x W1.4 A-1 GENERAL NOTES, SITE PLAN, PERSPECTIVES & LOCATION PLAN contents are the property of 4", 3,500 A-2 FLOOR PLANS, FRAMING & ELECTRICAL PLANS, PERSEPCTIVES, SCHEDULES & NOTES stl. mesh Herbert K. Guenther as PSI conc. A-3 BUILDING ELEVATIONS & SECTIONS, TYP. WALL SECTION, DETAILS & PERSPECTIVES governed by law. Any reinforcing reproduction, modifications or GENERAL NOTES alterations to these documents without the expressed written I. PRE-CONSTRUCTION: consent of Herbert K. Guenther Compacted A. Applicable code requirements may vary along with construction standards and techniques. This house to be built in accordance with the is prohibited by law. It is a sub-grade 6" clean 2020 NYS Residential Code (2018 International Residential Code). These drawings have been prepared to guide in the construction of a one violation of the New York State crushed stone story wood frame residence with a crawl space by personnel sufficiently qualified to read and interpret this design. All building trades shall Education law to alter this be knowledgeable of codes, standards and regionally accepted construction practices. Construction of the structure depicted by this drawing. 5 CONCRETE WALK DETAIL design should not be attempted by untrained personnel. B. This site plan was generated with a site plan provided by the client. c 2026 Herbert K. Guenther, AIA 1/2" = 1'-0" C. Verify all setbacks and grade elevations with building inspector and licensed land surveyor before beginning any work. D. Contractor to verify all dimensions and conditions prior to construction. Written dimensions have precedence over scaled dimensions. Contractor is responsible to check the plans and is to notify the Architect of any discrepancies or omissions prior to the start of construction. No modifications can be made without approval of the Architect. Do not scale the drawings. E. These notes are intended to set minimum standards. Contractor's written specifications and/or Agreement between Owner/Contractor may exceed these standards. PROJECT LOCATION SP F. The Contractor shall provide all necessary temporary support for walls, floors, ceilings and roofs during construction. P/ L RIN G. Unless provided for by previous agreement, the Architect will NOT provide construction progress review and/or job supervision. G P/ L ST H. All work shall be in strict compliance with the following: RE 1. 2018 International Residential Code P/L P/ ET 2. ACI Code, AISC Code L (49 Registered through 1/31/28 k bac .50 3. Generally accepted trades and industry standards Drawings conveyed for acquisition 90. ' WID I. The Contractor is to obtain necessary permits for construction and is to abide by regulations for inspection of foundations, framing, Set P/ L of building permit shall be signed, 0 0' E) plumbing, sewer, electrical and other parts of construction as mandated by local ordinances. sealed & dated d Yar P/ L P/L II. CLIMATIC, GEOGRAPHIC & DESIGN LOAD CRITERIA: ont P/ A. Floors- 40 P.S.F. live load + 10 P.S.F. dead load. Roof - 50 P.S.F. live load & 10 P.S.F. dead load. L . Fr B. Maximum allowable soil pressure = 2,500 P.S.F. (assumed). Min P/ L C. Ground Snow Load - 50 P.S.F., per 2025 RCNYS Figure R301.2(4) D. Nominal design wind speed = 90 MPH +/- (110 V ult), per 2025 RCNYS R301.21.3. and Table R301.2.1.3. 20' P/ L E. Seismic Design Category - B. P/L F. Weathering - Severe, per 2025 RCNYS Figure R301.2(1). SB P/ / L L G. Frost Line - 42" below grade SB / L H. Termite - slight to moderate SB I. Winter Design Temperature - 2 (14A) / L Herbert K. Guenther, AIA, NCARB 8689 Nottingham Terrace Williamsville, New York 14221 P/L P/L SB III. CONCRETE: www.premierpresentations.com / PH. 716-572-2754 / L A. All concrete shall conform with ACI 318 or ASTM C 1157. Exist. asphalt B. Exterior concrete shall be 3,500 P.S.I. concrete. SB [email protected] - / C. Contractor to be responsible for size, location & installation of required steel reinforcing in footings SB / L drive to remain L D. Footing sizes shown are only typical. Footings to be sized for stated soil pressures & consistent compaction whichever is more restrictive. P/L P/L SB E. Contractor to verify footings with local frost requirements or existing soil conditions whichever is more restrictive. Part of Lot 23 / L The American Institute F. Place and cure as per ACI Code. Township 9, Range 6 G. All foundations & footings shall rest on native soils with a minimum soil bearing capacity of 2,500 psf. Sublot 3, Block J H. Provide termite protection as required by local codes. SB / L SB / L IV. STRUCTURAL STEEL: P/L P/L of Architects A. All structural steel shall conform with ASTM specification A-36. Member of Exist. one story wood B. Unless otherwise noted, provide a 2x plate bolted to the top flange of all steel beams with 3/8" diameter bolts staggered at 2'-0" O.C. Rigidly fasten all connecting rafters & joists as approved by governing codes. frame house w/ attached 3 LOCATION PLAN garage to remain V. CARPENTRY: P/L P/L A. Unless otherwise noted, minimum framing lumber shall be Douglas Fir Larch #2 or better grade. Beams, headers & floor joists shall have a SB / L SB / L 10' minimum allowable bending stress of 1,200 P.S.I. All headers shall be free from splits, checks and shales. 10' Side Yard B. Unless otherwise noted provide: Side Yard Setback 1. Double header joist & trimmers at all floor openings, Setback 2. Double all joists under parallel partitions, 3. (2) 2 x 6 headers w/ 1/2" plywood spacers between for all exterior openings & those in load bearing walls, P/L P/L 4. Install one row of 1 x 3 cross bridging or metal bridging per joist span exceeding 8' in length, 5. Floor construction shall be 3/4" CDX plywood, tongue & groove. SB / L SB / L DATE C. Provide solid blocking between joists and rafters at bearing walls. Install cross bridging at midpoint of all floor joists. Install solid blocking - bearing below at all concentrated load points such as posts, columns, header support bearing studs. D. All joists shall have a minimum of 2 inch bearing on supports. No. 333 SPRING P/L P/L E. Built up beams and headers shall be glued and nailed with minimum 3 rows 16d nails at 12" O.C. STREET F. Steel flitch plates shall be bolted through their wood members with 3/4 inch diameter high strength bolts, nuts, washers at 2 foot spacing 9'-10" top end bottom in two staggered rows. G. GLULAM and MICRO-LAM members shall be Para-Lam (PSL) beams and shall be installed according to the manufacturer's requirements SB / L SB / L including nailing, bracing and end bearing, etc. 182.60' REVISIONS: P/L P/L H. Cutting or notching of joists, rafters, studs and other structural members shall conform to the 2015 International Residential Code and 10'-3" shall NOT compromise structural integrity. 139.20' Extend garage roof I. Provide framing members of sizes and on spacing shown, and frame opening as shown, or if not shown, comply with recommendations of NO. DESCRIPTION to new addition "Manual for House Framing" (N.F.P.A.). Do not splice structural members between supports. J. Anchor and nail as necessary and to comply with "Recommended Nailing Schedule" of "Manual for House Framing" and "National Design Conc. walk, Specifications for Wood Construction" published by N.F.P.A. SB / L SB / L P/L P/L see 5/A1 K. Fasteners and Anchorage's: Provide size, type, material and finish as indicated and as recommended House Framing" and "National Design Specifications for Wood Construction" published by N.F.P.A. L. Fasteners and Anchorage's: Provide size, type, material and finish as indicated and as recommended by applicable Federal Specifications for - Exist. conc. patio, nails, staples, screws, bolts, nuts, washers and anchoring devices. Provide metal hangers and framing anchors of the size and type DN reconfigure as req'd. recommended by the manufacturer for each use including recommended nails. INTERIOR PERSPECTIVES P/L P/L - M. Arrange studs so that wide face of the stud is perpendicular to direction of wall or partition and narrow face is parallel. Provide single 4 ISSUE DATE: SB / L SB / L bottom plate and double top plate using 2" thick members with widths equaling that of the studs; except single top plate may be used for N.T.S. non-load bearing partitions. Nail or anchor plates to supporting construction. 10-27-26 N. Roof & floor truss layout where shown is schematic only. Truss design, including spacing, shall be determined by truss manufacturer / JOB NO. Addition: Engineer. 2026-08 O. Special connectors as indicated at cantilevered joists and at roof trusses/joists are to be "Simpson Strong Tie" anchors or approved equal. P/L P/L Bedroom / Bath / GENERAL NOTES, SITE PLAN, PERSPECTIVES P. Contractor to provide fire blocking in concealed spaces every 10' horiz. and vert., at horiz. and vert. intersections such as soffits, drop and Kitchen & Screened Deck cove ceilings and at concealed space under stairs at top and bottom of stringers. Addition 664 SF +/- SB / L SB / L Q. Contractor to provide draft stopping in concealed spaces between useable spaces so that the area of the concealed space does not exceed 4' 1,000 S.F. Draft stopping shall also be installed in suspended ceilings under floor framing. P/L P/L VI. ENERGY: 4' A. All exposed insulation is to have a flame speed rating of less than 25 and smoke density rating of less than 450. B. Exterior joints, penetrations and openings in the structure shall be caulked, gasketed, weather stripped or otherwise positively sealed to as per manufacturer's instructions to prevent wind and moisture from entry. (Exterior doors, windows, utilities, framing joists between walls & LOCATION PLAN Bure Addition SB / L SB / L 10'-3" 16'-8" 4'x4' conc. pad, East Aurora, NY 14052 and floors and foundations). Install window sill pans as per window or air barrier manufacturer recommendations. P/L P/L 333 Spring Street see 5/A1 C. The maximum infiltration rate of doors and windows shall not be greater than .50 CFM and .37 CFM respectively. D. An air infiltration barrier is required behind ventilated or loose fitting siding. Installation details shall produce a shedding effect for moisture. E. Insulate all floor space above unconditioned areas (R-30). Insulate building envelope as required by details. F. All insulation materials that could absorb moisture must have a vapor barrier on the warm winter side. G. Heat ducts shall be insulated and sealed if installed in unconditioned space. P/L P/L SB / L SB / L H. Provide insulation at foundation walls as indicated on the drawings. SB / L I. Provide a natural gas-fired, sealed-combustion, direct-vent furnace, minimum 95% AFUE. Provide a balanced whole-house mechanical SB / L ventilation system utilizing a heat recovery ventilator (HRV), complete with outdoor-air intake, exhaust termination, ductwork, dampers and SB / L controls with manual override. Size ventilation airflow in accordance with 2025 RCNYS Section M1505.4.3. Coordinate any connection to the 20' Min. R SB / L furnace ductwork and blower controls with the equipment manufacturer’s instructions to maintain required ventilation independently of a P/L P/L heating demand. Comply with 2025 ECCCNYS Sections R403.6.2 and R403.6.3, including airflow testing and reporting ear Yard S VII. MISCELLANEOUS: A. Provide lighting at all stairways and hallways and in each habitable space as per local governing codes and regulations. B. Provide & install interconnected smoke detectors in all bedrooms and on each floor (including basement) as per local governing codes and regulations. Smoke detectors to be hard-wired. P/L etback P/L C. Contractor to install CO2 detectors as per local governing codes and regulations. P/L P/L D. The mechanical system is an existing boiler with baseboard heating system and shall be relocated / installed by the contractor as per local Drawn By: HKG P/L governing codes and regulations. P/L Checked By: HKG P/L E. Contractor to install all electrical outlets, switches and equipment as per local governing codes and regulations. P/L F. Contractor to install all plumbing lines and equipment as per local governing codes and regulations. 84.63 SHEET NO. P/L P/L P/L G. Install roof and soffit ventilation equal to 1% of attic floor area minimum. H. Exterior flashing to be correctly installed at all connections between roofs, walls, fireplace & projections or penetrations as required by good A1 common construction practices. OVERALL PERSPECTIVE SITE PLAN I. Install rain gutters and downspouts as per local codes. N 2 1 J. Grade site to drain away from the foundation and / or building. 1' = 10'-0" K. Install door sill guards during construction on all exterior doors.