A. The applicant or their agent shall submit five (5) hard copies of the site plan application form, site plan, other required Town forms, a SEQR EAF (part 1), and an application fee (to be determined by the Town). An electronic copy of these materials must also be submitted. The copies of a site plan and supporting data are to be prepared by and bearing the official seal and signature of a licensed architect, landscape architect, civil engineer or land surveyor (permitted by law to do such). These materials will include the following information, presented in drawn form at a scale approved by the Town and accompanied by a written text: (1) Survey of the property showing existing topographic features, including contours, large trees, buildings, structures, streets, property lines, utility easements, rights-of-way and land use, and the zoning and ownership of surrounding property. (2) A site plan showing proposed lots, blocks, building locations, all land use areas, including any outdoor proposed uses, fire and emergency vehicle access (any communication with emergency service providers), and lighting (lighting analysis, if requested). (3) An aerial photograph of the site and surrounding properties, marked up to illustrate how the proposed plan fits in with the surrounding properties. (4) Traffic circulation, parking and loading spaces and pedestrian walks. (5) Landscaping plans, including site grading, drainage existing and proposed landscape materials, including trees and shrubs, and their locations, identification of those materials to be removed, existing and proposed structures and all greenspace areas designed as part of the site environment. Natural site features and vegetation shall be preserved and integrated into the proposed site development wherever possible. These areas to be preserved/protected shall include some form or means to accomplish their protection, including the use of conservation easements. All new trees shall have a minimum of three inches of caliper measured six inches above the ground and be in accordance with the Town’s approved tree and vegetation list. (6) If requested by the Planning Board, a visualization of the proposed project and how the new development and proposed landscaping will help buffer or improve the character of the area (a visual impact analysis may also be requested). (7) Preliminary engineering plans, including street improvements, storm drainage system, public utility extensions, water supply, sanitary sewer facilities, outdoor lighting and the location of existing and proposed fire hydrants as approved by the Fire Chief or Town Engineer. (8) Preliminary architectural drawings/elevations for buildings to be constructed. (9) Construction sequence and time schedule for completion of each phase for buildings, parking spaces and landscaped areas. (10) Other information as determined during sketch plan review and/or during site plan application review. B. Stormwater pollution prevention plan. When applicable, a stormwater pollution prevention plan consistent with the requirements of the Town’s laws, shall be required for final engineering approval and shall submitted to the engineering department following site plan 50