Text · page 1 of 2
Read the whole document on one page (all 2 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
TOWN OF ELMA PLANNING BOARD 1600 Bowen Road, Elma, New York 14059 Phone: 716-652-3260 MINUTES OF REGULAR MEETING ~October 20, 2026 The Regular Meeting of the Town of Elma Planning Board, hereinafter referred to as the EPB, was held on Tuesday, October 20, 2026, at 7:00 PM in the Elma Town Hall at 1600 Bowen Road, Elma, New York. PRESENT: Chairman Michael Cirocco TOWN REPRESENTATIVES Member James Millard PRESENT Member Charles Putzbach Phyllis Todoro - Town Attorney Member Robert Waver Raymond Balcerzak -Asst Building Inspector Alternate James Lembke James Wyzykiewicz — Town Engineer ABSENT: — Member Michael Cleary Member Gregory Merkle I Approval of Regular Meeting Minutes from September 15, 2026 Mr. Waver motioned to approve the Minutes of the EPB Regular Meeting held on September 15, 2026. Mr. Lembke 2nd the motion. Motion approved. IL. forK & R Day Trucking Site Plan Review build a 80’ x 125’ top-soil storage building at 850 Bullis Rd Applicant Brad Day Applicant Brad Day of K & R Day Trucking proposed an 80’ x 125’ pole barn (front open, concrete base) for top-soil storage at 850 Bullis Road. Prior rezone approved, special use permit pending. Existing house on site to be demolished (asbestos clearance complete; demo permit pending). Access will be via existing K & R Day Trucking facility; no new driveway off Bullis Road. No tractor trailers/semis; dump trucks only. Two parcels currently; intent to consolidate in future but reviewed as separate parcels now. Building colors to match existing shop (green/beige); Exterior lighting: two downward-facing fixtures at front wing walls; to be drawn on plan and a basic light. No parking lot or customer/employee parking at this building; material storage only. Drainage: swales proposed; town engineer to review/approve. No signage proposed. Landscaping: optional berm near gas line; not required and not part of approval; applicant may install without needing to return. Fire access: letter from fire department required for all buildings. Windows: none proposed; board discussed typical visual treatments but agreed to waive windows due to open-front storage function and minimal road visibility. Setbacks: Side setback requirement is 10 ft (C-2). Board requested explicit value on plan; applicant agreed to meet/exceed code. Buffer: 100-ft residential buffer remains; rezoning intentionally left portion residential as neighbor buffer. Stephanie and Robert Wilkinson (adjoining homeowners at 900 Bullis Road) expressed concerns: potential expansion of operations, early-hours noise (lights at ~5:00 AM, backup alarms, tailgate slams, equipment loading, engine idling), impact on home value/quality of life; article referenced possible road salt storage not reflected in minutes; asked about DEC requirements, drainage to pond/railroad; asked whether any outside storage would occur (board clarified the special use permit is for indoor topsoil only, no outdoor piles).