Southtowns Record

July 15 2026 Town Board Agenda Packet

Government
Town of Evans
Board
Town Board
Meeting
Jul 15, 2026
Kind
Agenda packet
Topics
Zoning and land use, Public safety, Water, sewer and drainage, Audits and oversight, Budget and taxes, Housing

Original document

Same meeting

Text · page 29 of 35

Read the whole document on one page (all 35 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Resolution — NYS Department of Environmental Conservation’s Water
  Quality Improvements
 Program — Sturgeon Point Marina Sanitary Sewer Extension Project
  Approval

 WHEREAS, the Town Board desires to apply for financial assistance from
  the NYS Department of
 Environmental Conservation Water Quality Improvements Program to
  extend sanitary sewer
 infrastructure along Sturgeon Point Road to its terminus at Sturgeon Point
  Marina; and

WHEREAS, Lu Engineers and Fisher Associates ("the consultants") conduct
  ed a hydraulic study with
preliminary design as part of the Sturgeon Point Marina Master Plan; and

WHEREAS, the consultants have also provided a total project cost estimat
  e of $3,291,836; and

WHEREAS, the Town Board commits to providing the required local matchin
  g funds to ensure the
timely implementation of the proposed project.

NOW, THEREFORE, BE IT RESOLVED, that Ray Ashton, as Supervisor of the
  Town of Evans, is hereby
authorized and directed to accept funds from the NYS Department of Environ
  mental Conservation
in an amount not to exceed $2,468,877 for the Sturgeon Point Marina Sanitary
  Sewer Extension;
and

BE IT FURTHER RESOLVED, that upon approval of the application for financial
  assistance that the
Town make available $822,959 in matching funds to satisfy the requirements
  of the funding
program; and

BE IT FURTHER RESOLVED, that Supervisor Ashton is hereby authorized and directed
  to file an
application to the NYS Department of Environmental Conservation with a total
  project not to
exceed $3,291,836; and

BE IT FURTHER RESOLVED, that upon approval of said funding request, Supervis
  or Ashton is hereby
authorized to execute a project agreement and sign all documents with the
  NYS Department of
Environmental Conservation for the Sturgeon Point Marina Sanitary Sewer Extensio
  n Project.

ROLL CALL VOTE: