Southtowns Record

May 6 2026 Town Board Agenda Packet

Government
Town of Evans
Board
Town Board
Meeting
May 6, 2026
Kind
Agenda packet
Topics
Zoning and land use, Housing, Water, sewer and drainage, Budget and taxes, Audits and oversight, Public safety, Parks and recreation, Roads and traffic

Original document

Same meeting

Text · page 14 of 35

Read the whole document on one page (all 35 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Town Board Meeting #8  April 15, 2026

  WHEREAS, Phase IIA of the Master Plan includes establishing new roadways, walkways, park
  spaces, maintenance facilities, parking areas, and the creation of future mixed-use development
  sites; and  .

  WHEREAS, Fisher Associates has assisted in securing funding to develop 90% construction
  documents for the implementation of Phase IIA of the Master Plan in the amount of $356,250
  from NYS Department of State’s Local Waterfront Revitalization Program with an additional
  $118,750 from the Town for a total project cost of $475,000; and

  WHEREAS, Fisher Associates is able to provide specialized professional engineering and
  architectural services for improvements to the Evans Parks system based on their expertise,
  project background and local knowledge from continued  development and implementation of the
  Master Plan; and  1  |

  WHEREAS, Fisher Associates has provided Change Order Request #9 dated March 27, 2026
  in the amount of $475,000 to provide additional design developmeand  nt permitting support
  services for Phase IIA of the Sturgeon Point Marina,
  a Master Plan, progressi g the project to
  approximately 90% Construction Documents;  ee

  rks & Sturgeon Point Master Plan

  is hereby approved, as amended.
 VOTE RESULT:  Pyeads

  Supervisor
  eeraEn

 RESOLTION 2026
  02 #171 Change Order #6 (Design and Engineering Services for the Evans
  ind

  Waterfront Pavilion Restoration Project)
  .  .  beet  ra
 Councilman Wilson ‘moved, and C ouncilman Reitz seconded;
  hy

 WHEREAS, the Town of Evans, through a competitive Request for Proposals process,
 contracted with Fisher Associates to develop the Evans Parks and Sturgeon Point Marina
 Master Plan (the “Master Plan”); and

 WHEREAS, as part of the Master Plan, Fisher Associates developed preliminary plans and cost
 estimate for replacement of the waterfront pavilion located at Evans Town Park as well as other
 site improvements including landscaping and accessibility enhancements (the “Project”); and

  WHEREAS, Fisher Associates has assisted in securing funding in the amount of $150,000 from
_ a Community Development Block Grant with an additional $150,000 provided by the Town for a
 total project cost of $300,000; and