Text · page 14 of 35
Read the whole document on one page (all 35 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Town Board Meeting #8 April 15, 2026 WHEREAS, Phase IIA of the Master Plan includes establishing new roadways, walkways, park spaces, maintenance facilities, parking areas, and the creation of future mixed-use development sites; and . WHEREAS, Fisher Associates has assisted in securing funding to develop 90% construction documents for the implementation of Phase IIA of the Master Plan in the amount of $356,250 from NYS Department of State’s Local Waterfront Revitalization Program with an additional $118,750 from the Town for a total project cost of $475,000; and WHEREAS, Fisher Associates is able to provide specialized professional engineering and architectural services for improvements to the Evans Parks system based on their expertise, project background and local knowledge from continued development and implementation of the Master Plan; and 1 | WHEREAS, Fisher Associates has provided Change Order Request #9 dated March 27, 2026 in the amount of $475,000 to provide additional design developmeand nt permitting support services for Phase IIA of the Sturgeon Point Marina, a Master Plan, progressi g the project to approximately 90% Construction Documents; ee rks & Sturgeon Point Master Plan is hereby approved, as amended. VOTE RESULT: Pyeads Supervisor eeraEn RESOLTION 2026 02 #171 Change Order #6 (Design and Engineering Services for the Evans ind Waterfront Pavilion Restoration Project) . . beet ra Councilman Wilson ‘moved, and C ouncilman Reitz seconded; hy WHEREAS, the Town of Evans, through a competitive Request for Proposals process, contracted with Fisher Associates to develop the Evans Parks and Sturgeon Point Marina Master Plan (the “Master Plan”); and WHEREAS, as part of the Master Plan, Fisher Associates developed preliminary plans and cost estimate for replacement of the waterfront pavilion located at Evans Town Park as well as other site improvements including landscaping and accessibility enhancements (the “Project”); and WHEREAS, Fisher Associates has assisted in securing funding in the amount of $150,000 from _ a Community Development Block Grant with an additional $150,000 provided by the Town for a total project cost of $300,000; and 114