Text · page 32 of 35
Read the whole document on one page (all 35 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
i FO C&S Companies ale « We na | fy 141 ElmStreet , Suite 100 gy ae rey. Buffalo , NY 14203 mS Y p: (716) 847-1630 co MPANIES" f. (716) 847-1454 Www. cscos. com April 9, 2026 William Smith Director of Planning and Community Development Town of Evans 8787 Erie Road Angola, NY 14006 Re: Water Main Replacement along Lake Shore Road Supplemental Agreement 01 Dear Bill: Several out of scope work items were identified on the design of Phase 2 of the water main replacement project (AJ Schmidt Elementary School to just south of Lake Street). C&S is submitting this supplemental agreement request for your consideration to cover the following items: Water Main Profiles The original scope did not include water main profiles. After review of the Phase 1 plans, ECWA advised water main profiles would be required. C&S absorbed the additional time for this work on Phase | however, we are not able to absorb this cost on Phase 2. The following hours were required to address this task: Staff Title Hours Loaded Rate Subtotal David Askinazi Managing Engineer 4 $201.78 $807.12 Chad Stevens Project Engineer 12 $150.75 $1,809.04 Kyle Wishman Engineer 40 $138.63 $5,545.28 $8,161.43 Stand-Alone Project The original scope assumed the water main work on Phase 2 would be included in the Evans Shoreline Trail, Beaches Section (PIN 5764.69) project as a separate share. Given procedural delays and the desire to complete some construction in 2026, the decision was made to break out the water main work into a stand-alone job. This required preparing a complete set of plans including additional notes, details, tables (for temporary restoration) and a re-design of several sections of water main to avoid any ROW acquisitions (which would not have been secured before the project was bid). In addition, a separate water main specific spec book was prepared. The following hours were required to address these tasks: Staff Title Hours Loaded Rate Subtotal Dan Borez Department Manager 6 $243.41 $1,460.47 David Askinazi Managing Engineer 12 $201.78 $2,421.35 Chad Stevens Project Engineer 32 $150.75 $4,824.10 Kyle Wishman Engineer 60 $138.63 $8,317.92 $17,023.84 Total supplemental agreement request: $25,000 The Engineer’s Estimate for the Phase 2 water main work stands at $3,550,000. The C&S design fee of $102,000 is only 2.9% of the anticipated construction cost.