Text · page 24 of 39
Read the whole document on one page (all 39 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Res ‘| RESOLUTION ~ Approval of Property Maintenance Fees (Board Up Opening and Close Up of In-Ground Pool) WHEREAS; The Town of Evans Code Enforcement Office requires assistance with property maintenance for board ups during the period from April 1, 2026 to March 31, 2027; and WHEREAS; the town sets fees for said services based on materials and labor; and WHEREAS; the following fees are as follows; Board Up of Opening Labor Per Half - Man Hour $25.00 Per Man Hour $45.00 1 sheet of 1/2 inch CDX Plywood, painted with all $80.00 necessary accessories (framing per discretionary of the building inspector) Install Padlock and Latches Labor & Material 1 Padlock and Latches $40.00 Emergency Board-up (ie. fire) that requires immediate response and Close Up of In-Ground Pool Labor Per-Half Man Hour $25.00 Per Man Hour $45.00 1/2 inch COX plywood, painted with all necessary $80.00 per accessories sheet NOW, THEREFORE, BE IT RESOLVED, the Town Board of the Town of Evans does hereby authorize and approve the aforementioned fees during the period from April 1, 2026 to March 31, 2027. ROLL CALL VOTE