Text · page 11 of 19
Read the whole document on one page (all 19 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
RESOLUTION —-APPROVAL OF CHANGE ORDERS FOR SENIOR CENTER WINDOW PROJECT WHEREAS, the Town of Evans and Catalano Contracting entered into a contract, per an awarded bid, to complete the Town of Evans Senior Center window project: WHEREAS, the following fourteen (14) change orders totaling to the amount of $50,496.77 (see below): #1 8/20/2025 Louvers $ 1,050.00 $ 157.50 $ 1,207.50 #2 9/4/2025 Cabinet Demo $ 1,200.00 $ 180.00 $ 1,380.00 #3 9/17/2025 Window Janm/Sills $ 4,022.00 $ 603.30 $ 4,625.30 #4 9/17/2025 Plenum Boxes $ 5,629.25 § .00 $ 5,629.25 #5 wee ae — — $ .00 #6 9/17/2025 Mats $ .00 $ .00 #7 9/22/2025 Grates -$ 1,600.00 $ 00 =-$ 1,600.00 #8 9/22/2025 Oval Window $ .00 $ .00 #9 9/22/2025 Oval Window $ .00 $ .00 #10 11/25/2025 Cabinet Carpentry $ 1,200.00 $ 180.00 $ 1,380.00 #11 12/1/2025 Interior Window Trim $ 9,215.00 $1,382.25 $10,597.25 (Material) #12 = 12/1/2025 Gym Framing $ 6,261.00 $ 939.15 $ 7,200.15 #13 2/23/2025 interior Window Trim $15,900.00 $2,385.00 $18,285.00 (Labor) #14 = 2/23/2026 Additional Bonding $ 1,558.54 $ 233.78 $ 1,792.32 TOTAL $50,496.77; WHEREAS, the $10,000 contingency was utilized to reduce the total increase to $40,496.77; NOW, THEREFORE, BE IT RESOLVED, the Town of Evans Board authorizes the fourteen (14) change orders, which increases the above referenced project by $40,496.77 to a total of $484,088.78. ROLL CALL VOTE: ROLL CALL VOTE: