PBA09.10.2026packet (full text)
Page 1
WEST SENECA
PLANNING BOARD
1300 Union Road, West Seneca, NY 14224
6:00 PM in the Community Center
September 10, 2026
AGENDA
Meeting # 2026-09
CALL TO ORDER
APPROVAL OF PROOFS OF PUBLICATION
APPROVAL OF MINUTES
1. Minutes of Meeting #2026-08
OLD BUSINESS
NEW BUSINESS
SPR 2026-008
A request from Rusty Nickel located at 4350 Seneca St for an expansion on the right side
of the building.
ADJOURN
Page 1 of 84
Page 2
West Seneca Community Center Planning Board Proceedings
1300 Union Road Minutes #2026-08
West Seneca, NY 14224 August 13, 2026
Call To Order
A motion was made by Margaret Bebak to open the public meeting at 6:00 PM, which was
seconded by William Wise and approved. The meeting began with the Pledge of Allegiance.
Roll Call
Present:
• Joe Sherman, Board Member
• Margaret Bebak, Chairperson
• James Frick, Board Member
• Eric Sailer, Board Member
• Tim Hayes, Board Member
• William Wise, Board Member
Absent:
Excused absence for Mark Beeler noted by the Chair
Approval of Proofs of Publication
A motion was made by Chairperson Bebak to approve the proofs of publication. The motion was
seconded Eric Sailor.
• Ayes: All
• Noes: 0
• Abstain: 0
• Motion carried
Approval of Minutes
A motion was made by Chairperson Bebak to approve the minutes from meeting #2026-07. The
motion was seconded by Joseph Sherman.
• Ayes: All
• Noes: 0
• Abstain: 0
• Motion carried
Old Businesses
Page 2 of 84
Page 3
SPR 2026-003 Request of Home Leasing for site plan approval for property located at 2544
Clinton Street to permit a three-story multi-unit residential building with associated site
work.
• Business Speakers:
o Angela Eichholz (applicant representative)
o Dave Johnson (Lovella)
o Applicant Statements:
o Submitted wetland delineation report; no wetlands found on site.
o Believe remaining town engineer items are minor; seeking conditional site plan
approval.
o Architectural colors/elevations still under review; not finalized.
o Operations/maintenance plans for rooftop heat pumps are standard across
managed properties and require investor/state funder approval; access will be
provided, specifics to be finalized.
o Claims outreach to school superintendent (Ms. Kruger) occurred; has emails and
policy information from school transportation regarding walking/busing; district
has capacity for projected students.
• Board Questions and Answers:
o Margaret Bebak inquired about prior elevation/material coordination concerns.
▪ Applicant Response: Color coordination still in progress.
o William Wise inquired about physical access, snow drifting, and snow clearing
procedures.
▪ Applicant Response: Access will be included in the O&M plan; specifics
are being refined, with 24-hour maintenance on call.
o Joe Sherman raised several concerns:
▪ Blizzard contingency: Asked about capacity and logistics for relocating
residents to the White Mansion community room, including food and
duration plans.
▪ Applicant Response: Believes it was addressed previously; specifics were
not on hand.
▪ Broader life safety: Voiced concern about the reliability of heat during
prolonged storms and the need for timely rooftop maintenance.
▪ Fire protection/water supply: Observed only one hydrant across Clinton
Street; concerned about 720 ft hose lays and PSI requirements.
▪ School coordination: Questioned contact with West Seneca CSD
transportation (reported call with Associate Supervisor Josh Torres stating
no contact received) and the superintendent regarding student impact.
▪ Applicant Response: Asserted superintendent contact occurred
and documentation exists; characterized some comments as outside
Planning Board purview.
▪ Fire apparatus access: Concerned about access to rear building areas,
ladder reach/rescue times for second/third floors (especially for
elderly/disabled residents), and response/setup times.
o Dave Johnson Response: Noted that fire apparatus access, hydrant spacing,
ladder reach, and life safety components are typically reviewed by the fire
Page 3 of 84
Page 4
department and during building permit review, characterizing them as building
code issues rather than site plan items. Indicated fire department comments should
address these concerns.
o Additional Board Exchange: Joseph Sherman expressed dissatisfaction with
repeated “we’ll get back” responses. Discussion acknowledged the boundary
between building vs. site plan review.
• Public Comments:
o George Heidi (former volunteer firefighter):
▪ Questioned rooftop heat pump access and timely snow clearing due to
heavy drifting.
▪ Asked about elevators for handicapped residents and ensuring
accessibility, feeling these should have been addressed earlier.
• Motion: A motion was made to approve the site plan as outlined in submitted drawings.
An amendment was added by the Chair.
o Recommendation: Approve site plan subject to the completion of the items
enumerated in the letter from the Engineering Department.
o Motion by: Margaret Bebak
o Seconded by: James Frick
o Ayes: Majority (voice vote "Aye")
o Noes: Joseph Sherman & William Wise
o Abstain: None stated
o Motion carried
New Businesses
SPR 2026-007 Request of Benchmark Streamline LLC for site plan approval for property
located at 325 Orchard Park Road for a multi-building mixed-use development (Costco
anchor) and associated site work.
• Business Speakers:
o Ralph Lorigo (attorney, on behalf of Benchmark Streamline LLC)
o Martin Dellebovi (Benchmark Group)
o Chris Wood (Carmina Wood Design) – civil engineering lead
o Mark Marchisano (Costco Director of Development)
o Kimberly Masiuk (Project Manager, BL Companies (on behalf of Costco)
o Kevin Kilguss, (Project Manager, BL Companies (on behalf of Costco)
o Applicant Statements:
o Project Overview: Seeking approval for a 56-acre development, including the
Costco site and main infrastructure (interior roads, stormwater, utilities). The
Costco building will be ~158,000 sq ft (~187,000 sq ft total with MDO) with gas
pumps on an 18-acre parcel. The project is framed as a major tax base expansion.
o Tenant Strategy: A mix of services, restaurants, and retail is planned to ensure a
complementary tenant mix and high occupancy. Retailer interest reportedly
exceeds available space.
Page 4 of 84
Page 5
o Parcel/Site Details: The Tops store remains; Tops Express, Community Bank,
and Lorigo Law Offices are not part of the development. The rear of the Costco
site abuts a railroad.
o Traffic Improvements: The developer will fund significant off-site
improvements, including replacing two traffic lights, adding a third on Slade
Avenue, widening Slade Avenue with a center turn lane and sidewalks, and
reconfiguring the Ridge Road/Slade Avenue/US-219 off-ramp. A right-in only
driveway from Slade Avenue will serve Costco.
o Stormwater & Sewer: A sewer capacity analysis was approved by the Town.
Stormwater will discharge via a 6 ft x 6 ft NYSDOT-owned pipe that crosses
Orchard Park Road through the Wegmans lot to a creek. This pipe was televised
for inspection. All private sewer mains on the property will be replaced to
eliminate I&I, and an I&I fee will be paid to the Town.
o Geotechnical: A large on-site soil pile will be used to surcharge (compress) the
soil under the Costco and fuel facility pads for structural stability. This process is
expected to take 4-12 months. The soil will be redistributed on-site afterward.
o Costco Specifics: The building includes a main retail area and a Market Delivery
Option (MDO) area for local delivery. It will have a Tire Center (sales/installation
only). The fuel facility will have 16 pumps (32 stations) with long hoses, ~145
feet of queuing space, an attendant, and digital signage. Truck circulation is
designed to keep delivery vehicles away from the main customer entrance. Seven
new fire hydrants and a fire protection loop are proposed.
o Utilities & Landscaping: The site will have separate utility services.
Landscaping will exceed town standards with native species and full-site
irrigation. Lighting will be modern, dark-sky compliant LED.
o Timeline: The team is targeting a Q2 2027 start for site work, with pad delivery
to Costco by end of 2027/early 2028. Once Costco begins, development is
expected to accelerate. Offsite traffic is part of the initial phase.
• Board Questions and Answers:
o Joseph Sherman asked if equipment could accelerate soil compression.
▪ Response: Surcharging was deemed most effective; will take 4-12
months.
o James Frick asked about the discharge pipe ownership.
▪ Response: It's owned by NYSDOT and crosses the Wegmans lot to the
creek. If over 5 ft, the state must inspect it every six years.
o Tim Hayes asked about the timeline.
▪ Response: Surcharging can occur in winter (~4 months); target site work
start Q2 2027.
o Margaret Bebak asked for specifics on Slade Avenue improvements.
▪ Response: Widening, center turn lane, sidewalks, and new/upgraded
signals, all paid by the developer. The traffic consultant performed
analysis, and the design was iterated per County/DOT reviews, who are
comfortable with it.
Page 5 of 84
Page 6
o Eric Sailor questioned about an entrance driveway leading directly into parking.
o Response: Widening, center turn lane, sidewalks, and new/upgraded signals, all
paid by the developer.
o Tim Hayes asked about the "surcharge" concept.
▪ Response: It refers to placing a weight of soil to consolidate subsurface
soils, not related to stormwater or environmental issues.
o Margaret Bebak asked about the status of the traffic study with NYSDOT.
▪ Response: The County is satisfied; awaiting DOT feedback on the latest
version. A DOT work permit is required before off-site work can begin.
• Public Comments:
o Unnamed Resident: Concerned about existing traffic congestion and requested
clarity on the traffic study's effectiveness.
▪ Response (Board/Engineer): The study is extensive and coordinated with
Erie County/NYSDOT. The proposed improvements at every surrounding
intersection are expected to address current issues.
o Jeff Quain: 1) Recommended alignment with the town's comprehensive plan. 2)
Asked for certainty on Costco as the tenant, citing a news article. 3) Requested
communications with the West Seneca School District be made public to
understand impacts, especially regarding planned work near an elementary
school.
o Evelyn Hicks (Seneca Creek Road): 1) Asked for clarification on "surcharge."
2) Requested the Board delay voting to allow residents more time for review. 3)
Asked about the integrity of the 40-50+ year old discharge pipe. 4) Asked about
potential soil contamination from the former mall.
o Peter Spilsbury (Fire Commissioner, West Seneca Fire District No. 5):
Expressed strong support, citing benefits to the district's budget.
o Joseph O’Donnell: Asked about traffic mitigation coverage, agency responses,
legal prerequisites, and project phasing.
o Mary Sherman (Caldwell Drive): Asked about improvements near the Route
400/Seneca Street exit.
• Motions:
o Motion to close the public hearing.
▪ Motion by: Chairperson Margaret Bebak
▪ Seconded by: Joseph Sherman
▪ Ayes: All
▪ Noes: None
▪ Abstain: None
▪ Motion carried
o Motion to approve the site plan for both the overall site and Costco.
▪ Recommendation: Approval subject to: 1) Completion of requirements in
the letter from the Town Engineering Department; and 2) NYSDOT
approval and issuance of the DOT work permit prior to off-site work.
▪ Motion by: Chairperson Margaret Bebak
▪ Seconded by: Joseph Sherman
▪ Ayes: All
▪ Noes: None
Page 6 of 84
Page 7
▪ Abstain: None
▪ Motion carried
Adjourn
• Motion by: Margaret Bebak
• Seconded by: James Frick
• Time: 7:17 pm
Page 7 of 84
Page 8
SHEET INDEX
DWG.
SHEET NAME
NO.
ARCHITECTURE & ENGINEERING
G-100 COVER
C-001 EXISTING CONDITIONS - SCALE 1:30 255 ROUNDS AVE, BUFFALO NY 14225
C-001A EXISTING CONDITIONS - SCALE 1:20
DEMO PLAN AND EROSION AND
C-002
SEDIMENT CONTROL PLAN PROJECT INFORMATION
C-101 SITE PLAN
C-102 GRADING PLAN
Project Name
4350 SENECA STREET
C-103 DRAINAGE PLAN
BUILDING ADDITION
C-104 UTILITY PLAN
C-105 PHOTOMETRIC PLAN Project Address
L-101 LANDSCAPE PLAN
4350 SENECA ST.
WEST SENECA, NY 14224
A-101 1ST FLOOR PLAN
PROJECT LOCATION
WEST SENECA, NY A-102 2ND FLOOR PLAN Client Name
A-201 ELEVATIONS PLAN HAVENS HOLDING GROUP
Waves Project Number
24001.00
LOCATION MAP
NTS
4350 SENECA STREET
BUILDING ADDITION PROJECT ISSUE & REVISION SCHEDULE
07/27/26 PERMIT DRAWING
Date Description
1
LOCATION MAP - 4350 SENECA ST
#
PROFESSIONAL STAMPS
NTS
APPLICANT: HAVENS HOLDING INC. PH/FAX: 585-305-5199
ADDRESS: 255 ROUNDS AVE, BUFFALO NY 14215
OWNER: HAVENS HOLDING INC. PH/FAX: 585-305-5199
ADDRESS: 255 ROUNDS AVE, BUFFALO NY 14215
ENGINEER/ARCHITECT: WAVES ARCH & ENGINEERING PH/FAX: 585-305-5199
ADDRESS: 255 ROUNDS AVE, BUFFALO NY 14215
SITE DATA - RUSTY NICKEL BREWING CO.
SITE AREA = 35283.6 SF / 0.81 ACRES
CURRENT ZONING: C2-7.E
DESCRIPTION: COMMERCIAL ZONING AND SPECIAL USE (BREWERY)
JULY 2026 ADDRESS: 4350 SENECA STREET, WEST SEENCA, NY 14224
SBL: 135.17-3-8.2
MINIMUM LOT SIZE: 9850 SF
4350 SENECA STREET ACTUAL LOT SIZE: 35283.6 SF
AREA OF DISTURBANCE: 3383.29 SF <= OR >= 0.078 ACRES
TOWN OF WEST SENECA, NY 14224 ARCES. SWPPP (NO)
REQUIRED PROVIDED
LOCATION MAP - 4350 SENECA ST 1. LOT COVERAGE IN % ACTUAL = 7.047%
SETBACK REQUIREMENTS:
NTS 2.
3.
FRONT YARD
SIDE YARD
MIN. = 40 FT
MIN. = 5 FT
ACTUAL = 315 FT
ACTUAL = 5 FT
4. TOTAL SIDE YARD MIN. = 10 FT ACTUAL = 32 FT
5. REAR YARD MIN. = 38 FT ACTUAL = 38 FT
6. BUILDING SEPARATION N/A
7. BUILDING HEIGHT MAX = 40 FT ACTUAL = 38 FT
8. FINISHED GROUND FLOOR MIN. 0', MAX. 4' ACTUAL = 0'-0" SHEET INFORMATION
9. GROUND STORY HEIGHT MIN.= 13' ACTUAL = 12'-0"
Issued Scale for 22x34 Sheets
BUILDING GROUND FLOOR TRANSPARENCY: 07/28/2026 N.T.S.
10. FRONT FACADE MIN. 30% ACTUAL = 36%
Project Status
11. PEDESTRIAN ACCESS LOCATION MAIN ENTRANCE LOCATION PERMIT - SITE PLAN
12. WALL SURFACE MATERIAL BOARD AND BATTEN WOOD
EXISTING = 3,000 SF ACTUAL = 4,808 SF
Drawing Title
13. EXISTING / PROPOSED BUILDING SF
14. PARKING - EATING / DRINKING ESTABLISHMENT TWO (2) SPACES PER FIVE ACTUAL = 45 SPACES COVER
NOTES: (5) SEATS. 223 PEOPLE Drawn By Checked By
1. IT IS A VIOLATION OF THE NEW YORK STATE EDUCATION LAW FOR ANY PERSON, UNLESS ACTING MAX OCCUPANCY = 45 KSR JLH
UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER AN ITEM ON THESE PLANS SPACES.
IN ANY WAY. IF ALTERCATIONS TO THESE PLANS ARE REQUIRED, THE ALTERCATIONS SHALL BE MADE Drawing Number
IN ACCORDANCE WITH ARTICLE 145 -- SUBSECTION 7209 OF THE NEW YORK STATE EDUCATION LAW.
2. PROJECT PARCEL (4350 WEST SENECA ST, WEST SENECA NY, 14224) HAS NO WETLANDS, FLOODWAYS,
AND FLOOD PLAINS.
15. EXISTING UTILITIES AND SIZES ACTUAL = SEE DWG C-104
G-100
Page 8 of 84
Page 9
EXISTING CONDITIONS NOTES:
1. EXISTING TOPOGRAPHIC INFORMATION SHOWN IS BASED
ON THE SURVEY PROVIDED BY THE OWNER UNLESS
4350 SENECA ST. OTHERWISE NOTED.
OH
W
2. EXISTING UTILITY INFORMATION SHOWN IS BASED ON
AVAILABLE SURVEY DATA AND RECORD INFORMATION. ARCHITECTURE & ENGINEERING
OH
W UTILITY LOCATIONS, SIZES, AND ELEVATIONS SHALL BE
VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION. 255 ROUNDS AVE, BUFFALO NY 14225
OH
W 3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER
IMMEDIATELY OF ANY DISCREPANCIES BETWEEN EXISTING
OH
W
FIELD CONDITIONS AND THE INFORMATION SHOWN ON
THESE PLANS BEFORE PROCEEDING WITH WORK. PROJECT INFORMATION
ZO 4. UNDERGROUND UTILITIES NOT SHOWN ON THESE PLANS
R-7 NE
OH
Project Name
W
MAY EXIST. THE CONTRACTOR SHALL CONTACT THE
5
OH
W
APPROPRIATE UTILITY NOTIFICATION SERVICE PRIOR TO 4350 SENECA STREET
ANY EXCAVATION.
5. EXISTING CONTOURS AND SPOT ELEVATIONS REPRESENT
BUILDING ADDITION
CONDITIONS AT THE TIME OF SURVEY. NO GUARANTEE IS Project Address
OH
W
MADE REGARDING CHANGES OCCURRING AFTER THE
OH
SURVEY DATE.
4350 SENECA ST.
WEST SENECA, NY 14224
W
6. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND
SITE IMPROVEMENTS TO REMAIN THROUGHOUT
OH
W
CONSTRUCTION. Client Name
OH
W
7. VERIFY THE LOCATION AND ELEVATION OF ALL EXISTING HAVENS HOLDING GROUP
UTILITY STRUCTURES, INCLUDING SANITARY SEWER, STORM
SEWER, WATER, GAS, ELECTRIC, TELECOMMUNICATIONS,
OH
W
AND DRAINAGE FACILITIES, PRIOR TO BEGINNING Waves Project Number
CONSTRUCTION. 24001.00
OH
W 8. ANY DAMAGE TO EXISTING FACILITIES CAUSED BY
ST
CONSTRUCTION OPERATIONS SHALL BE REPAIRED OR
OH
REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST
W
TO THE OWNER.
OHW
ST
K
OH
W
AC
ETB
1
DS
ST OH
OHW
W
ST
AR
C-100A PROJECT ISSUE & REVISION SCHEDULE
RY
OH
EA
W
'R
W
25
OH
OH
W
ZONE
R-65A
ZONE
R-65A
5' SIDE YARD
SETBACK
07/27/26 PERMIT DRAWING
ZONE
R-65 2018 ZONING MAP
2 SCALE: NTS
Description
ZONE
C2.7E
Date
1
#
EXISTING PROP. PROFESSIONAL STAMPS
BOUNDARY
ZONE
R-65A ST
ST
ST
ST
ST
ST
ST
ZONE C2
ST
ZONE C1-S
ST
ZONE C2
ST
ST
ST
ST
NOT FOR CONSTRUCTION
ST
ST
ST
SHEET INFORMATION
Issued Scale for 22x34 Sheets
07/28/2026 1" = 30'
ST
Project Status
OHW
LEGEND: PERMIT - SITE PLAN
Drawing Title
ST
EXISTING MAJOR CONTOURS
EXISITNG CONDITIONS - OVERALL
OHW
EXISTING MINOR CONTOURS
Drawn By Checked By
EXISTING PROPERTY BOUNDARY ANW JLH
30 0 30 60
EXISTING SITE CONDITIONS MERGED PARCELS Drawing Number
1
C-001
OHW
SCALE: 1" = 30'
SCALE IN FEET
Page 9 of 84
Page 10
PLAN NOTES:
1. REF. SHEET C-001 FOR EXISTING CONDITIONS NOTES AND
THE OVERALL EXISTING CONDITIONS PLAN.
ARCHITECTURE & ENGINEERING
OH
W
255 ROUNDS AVE, BUFFALO NY 14225
OH
W
OH
W
PROJECT INFORMATION
OH
W
Project Name
4350 SENECA STREET
OH
W
BUILDING ADDITION
OH
W
Project Address
4350 SENECA ST.
OH
W
ZO WEST SENECA, NY 14224
R-7 NE
OH
W 5 Client Name
HAVENS HOLDING GROUP
OH
W
OH
W
Waves Project Number
24001.00
OH
W
OH
W
OH
W
OH
W
OH
W
PROJECT ISSUE & REVISION SCHEDULE
OH
W
OH
W
OH ST
W
ST
OH
W
W
OH
ST
OH
W
ST
07/27/26 PERMIT DRAWING
W
OH
OH
W
CK
BA
ST
ST
OH
W
SET
Description
OHW
RD
ST
OH
YA
W
ST
AR
' RE
OH
W
W
25
OH
OH
W
OHW
ZONE
R-65A
Date
1
ZONE
#
R-65A
5' SIDE YARD PROFESSIONAL STAMPS
SETBACK
ZONE
R-65
ZONE
C2.7E
NOT FOR CONSTRUCTION
EXISTING PROP. BOUNDARY
ZONE
R-65A ST
ST
ST
ST
SHEET INFORMATION
ST
Issued Scale for 22x34 Sheets
LEGEND:
ST
07/28/2026 1" = 20'
EXISTING MAJOR CONTOURS
Project Status
ST
PERMIT - SITE PLAN
ST
EXISTING MINOR CONTOURS
PROPERTY LINE Drawing Title
EXISITNG CONDITIONS SECTION
EXISTING PROPERTY BOUNDARY
Drawn By Checked By
ST
MERGED PARCELS ANW JLH
20 0 20 40 Drawing Number
SCALE IN FEET C-001A
Page 10 of 84
Page 11
DEMOLITION NOTES: EROSION CONTROL PLAN:
1. CONTRACTOR SHALL VERIFY ALL EXISTING FIELD NOTE: THE FOLLOWING EROSION CONTROL PROCEDURES
CONDITIONS PRIOR TO COMMENCING DEMOLITION SHALL BE ADHERED TO BY THE CONTRACTOR. THIS PROJECT
OH
W ACTIVITIES. NOTIFY THE ENGINEER IMMEDIATELY OF ANY DISTURBS LESS THAN ONE (1) ACRE AND IS NOT SUBJECT TO
DISCREPANCIES BETWEEN FIELD CONDITIONS AND THE NYSDEC SPDES GENERAL PERMIT COVERAGE OR SWPPP
OH
W
2.
PLANS.
DEMOLITION SHALL BE LIMITED TO ONLY THOSE ITEMS
REQUIREMENTS. ARCHITECTURE & ENGINEERING
SPECIFICALLY IDENTIFIED ON THE PLANS. EXISTING 1. ALL STUMPS AND BRUSH MAY NOT BE BURIED IN THE TOWN
OH
W
IMPROVEMENTS NOT DESIGNATED FOR REMOVAL SHALL AND TOPSOIL MAY NOT BE REMOVED FROM THE WORK
255 ROUNDS AVE, BUFFALO NY 14225
REMAIN AND BE PROTECTED THROUGHOUT WITHOUT A PERMIT.
OH
W
CONSTRUCTION. 2. INSTALL SILT SOCK ALONG THE LIMITS OF DISTURBANCE AS
OH
W
3. CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY
NOTIFICATION SERVICE AT LEAST 72 HOURS PRIOR TO
SHOWN ON THIS PLAN. REPLACE OR REPAIR WHEREVER
CLOGGED, DAMAGED, OR INOPERABLE.
PROJECT INFORMATION
EXCAVATION OR DEMOLITION. FIELD VERIFY THE 3. THE CONTRACTOR SHALL MAINTAIN ALL TEMPORARY
OH
W LOCATION OF ALL UNDERGROUND UTILITIES BEFORE SEDIMENT CONTROLS UNTIL DISTURBED AREAS ARE FULLY Project Name
BEGINNING WORK. STABILIZED. 4350 SENECA STREET
OH
W 4. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND 4. DIRT OR DEBRIS TRACKED ONTO PUBLIC ROADS SHALL BE BUILDING ADDITION
FACILITIES TO REMAIN. ANY DAMAGE RESULTING FROM REMOVED AND ROAD SURFACES CLEANED DAILY.
OH
W
CONSTRUCTION OPERATIONS SHALL BE REPAIRED OR 5. THE CONTRACTOR SHALL CONTROL DUST THROUGHOUT Project Address
REPLACED BY THE CONTRACTOR AT NO ADDITIONAL CONSTRUCTION. USE OF PETROLEUM-BASED PRODUCTS 4350 SENECA ST.
OH
W
COST TO THE OWNER. FOR DUST SUPPRESSION IS PROHIBITED. WEST SENECA, NY 14224
5. REMOVE AND LEGALLY DISPOSE OF ALL DEMOLISHED 6. ALL DISTURBED AREAS SHALL BE STABILIZED (SEEDED,
OH
MATERIALS OFF-SITE UNLESS OTHERWISE DIRECTED BY THE MULCHED, OR OTHERWISE PROTECTED) WITHIN 14 DAYS OF Client Name
OWNER. CEASED DISTURBANCE.
HAVENS HOLDING GROUP
W
6. SAWCUT EXISTING PAVEMENT, CONCRETE SLABS, 7. THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF
OH
W SIDEWALKS, AND CURBS AT THE LIMITS OF DEMOLITION TO DOWNSTREAM STORM SEWERS, DITCHES, AND CULVERTS.
PROVIDE NEAT, STRAIGHT EDGES FOR PROPOSED SILT BUILDUP RESULTING FROM THIS PROJECT SHALL BE
OH CONSTRUCTION. REMOVED AT NO ADDITIONAL EXPENSE TO THE OWNER OR Waves Project Number
24001.00
W
7. BACKFILL EXCAVATIONS RESULTING FROM DEMOLITION MUNICIPALITY.
OH
W
WITH APPROVED STRUCTURAL FILL AND COMPACT IN 8. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE
ACCORDANCE WITH THE PROJECT SPECIFICATIONS. MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED, AS
OH
EXISTING GRADING DISTURBED DURING DEMOLITION DIRECTED BY THE ENGINEER.
W
SHALL BE RESTORED OR REGRADED AS SHOWN ON THE 9. STOCKPILE AND CONCRETE WASHOUT LOCATIONS SHALL
PROPOSED GRADING PLAN, C-102. BE ESTABLISHED AS SHOWN ON THIS PLAN, INCLUDING SILT
OH
W
8. CONTRACTOR SHALL MAINTAIN SAFE ACCESS TO SOCK AROUND STOCKPILE BASES. STOCKPILES SHALL BE
OCCUPIED PORTIONS OF THE SITE THROUGHOUT TEMPORARILY STABILIZED AS SOON AS PRACTICABLE.
OH
W DEMOLITION OPERATIONS UNLESS OTHERWISE APPROVED 10. TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON SITE FOR
BY THE OWNER. REUSE AS DIRECTED BY THE OWNER. TOPSOIL MAY NOT BE
OH
W
9. STOCKPILE MATERIALS DESIGNATED BY THE OWNER FOR REMOVED FROM SITE WITHOUT A PERMIT. PROJECT ISSUE & REVISION SCHEDULE
SALVAGE IN A LOCATION APPROVED BY THE OWNER. 11. INLET PROTECTION SHALL BE INSTALLED AT ALL STORM
OH ST
ALL REMAINING DEMOLISHED MATERIALS SHALL BECOME DRAINAGE STRUCTURES PRIOR TO THE STRUCTURE
W
THE RESPONSIBILITY OF THE CONTRACTOR. BECOMING OPERATIONAL, REGARDLESS OF WHETHER
10. PROTECT ALL TREES, LANDSCAPING, STRUCTURES, AND SHOWN ON THIS PLAN. THE CONTRACTOR SHALL FIELD
ST
OH
W SITE FEATURES DESIGNATED TO REMAIN FROM DAMAGE VERIFY THE LOCATION OF ALL STORM STRUCTURES WITHIN
W
OH
DURING DEMOLITION OPERATIONS. THE LIMITS OF DISTURBANCE PRIOR TO COMMENCING
ST 11. EXISTING UTILITIES ENCOUNTERED THAT ARE TO REMAIN IN WORK AND NOTIFY THE ENGINEER OF ANY
OH
W SERVICE SHALL BE ADEQUATELY SUPPORTED AND DISCREPANCIES.
ST
PROTECTED THROUGHOUT CONSTRUCTION.
12. ANY UTILITIES DISCOVERED DURING DEMOLITION THAT SEQUENCE OF MAJOR ACTIVITIES:
OHW
OH
W
CONFLICT WITH PROPOSED IMPROVEMENTS AND ARE
NOT SHOWN ON THE PLANS SHALL BE BROUGHT TO THE NOTE: A STABILIZED CONSTRUCTION ENTRANCE IS NOT
CK
ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING. REQUIRED, AS THE EXISTING PARKING LOT WILL SERVE THIS
BA
ST
ST
OH
W
13. CONTRACTOR SHALL COORDINATE DEMOLITION FUNCTION.
07/27/26 PERMIT DRAWING
SET
ACTIVITIES WITH THE OWNER TO MINIMIZE DISRUPTION TO
W
OH
RD
ST
OH ONGOING SITE OPERATIONS.
YA
W
1. INSTALL EROSION CONTROL MEASURES.
ST
RELOCATION OF EXISTING ELEC. POLE
AR
2. ESTABLISH STOCKPILE AND CONCRETE WASHOUT
' RE
Description
OH
W
LOCATIONS AS SHOWN ON THIS PLAN.
OHW
25
3. COMMENCE SITE EXCAVATION.
4. COMMENCE CONSTRUCTION.
OH
W 5. ESTABLISHMENT (FINAL GRADING, SEEDING, PLANTING,
SSK SSK AND STABILIZATION).
SSK
LOD
W
OH
RESTORATION NOTES:
LOD
LO
D
LIMIT OF DISTURBANCE 1. ADJACENT AREAS DISTURBED OR DAMAGED DURING
RELOCATION/ DEMOLITION OF EXISTING ELEC. POLE AREA = 3383.29 ft² CONSTRUCTION SHALL BE RESTORED IN KIND TO THE
SSK
EXISTING SHED, TBD BY OWNER TO BE RELOCATED SATISFACTION OF THE OWNER.
PROTECT IN PLACE EXISTING 2. WHEN RESTORING LAWN AREAS ADJACENT TO NEW
SSK
STOCKPILE AREA PAVILION STRUCTURE CONSTRUCTION, ON-SITE MATERIAL MAY BE USED TO
BACKFILL WITHIN SIX INCHES OF FINISHED SURFACE,
Date
THOROUGHLY COMPACTED AND FREE OF GRASS CLUMPS,
LOD
REMOVE EX. CONC. RETAINING WALL IN
TREE ROOTS, ASPHALT PIECES, OTHER EXTRANEOUS
LOD FULL. REF. C-102 FOR NEW RETAINING
MATERIAL, AND STONES LARGER THAN 1 INCH.
WALL LOCATION AND ELEVATIONS
3. ALL DISTURBED UNSURFACED AREAS SHALL RECEIVE FOUR
5' SIDE YARD INCHES OF TOPSOIL, SEED, AND MULCH, AND SHALL BE
LOD
1
SETBACK WATERED UNTIL A HEALTHY STAND OF GRASS IS
ESTABLISHED. DISTURBED ASPHALT, CONCRETE, OR PAVING
#
STONE AREAS SHALL BE REPLACED IN KIND: SAW CUT FULL
DEPTH ALONG STRAIGHT, TRUE LINES; PAVING STONES PROFESSIONAL STAMPS
REPLACED IN WHOLE UNITS MATCHING EXISTING SIZE,
LO
D
SHAPE, AND COLOR; ASPHALT COMPACTED TO A
CHILLER ON CONC. PAD TO SMOOTH FINISH FLUSH WITH ADJACENT SURFACES TO
BE RELOCATED, REF. C-101 REMAIN.
FOR NEW LOCATION
LOD
SILT SOCK, TYP. INSPECTION AND MAINTENANCE PROCEDURES:
NOTE: THE CONTRACTOR SHALL ASSIGN AN INDIVIDUAL
RESPONSIBLE FOR INSPECTION AND MAINTENANCE OF
LOD
LOD
TEMPORARY EROSION AND SEDIMENTATION CONTROL
SSK MEASURES, INCLUDING BUT NOT LIMITED TO:
LOD
SILT SOCK, TYP. SS
K
LO
D 1. INSPECT ALL EROSION CONTROL MEASURES AT LEAST
ONCE EVERY SEVEN CALENDAR DAYS, AND FOLLOWING
SNOWMELT/FREEZE-THAW EVENTS.
2. MAINTAIN ALL MEASURES IN GOOD WORKING ORDER AS
DEEMED NECESSARY BY THE TOWN AND ENGINEER;
LOD
COMPLETE REPAIRS WITHIN 24 HOURS OF BEING REPORTED.
SILT SOCK, TYP. CONC. WASH OUT 3. CHECK AND REPAIR SILT SOCK AND EROSION CONTROL
DEVICES AS NECESSARY.
4. INSPECT TEMPORARY AND PERMANENT
LOD
SEEDING/PLANTING FOR BARE SPOTS, WASHOUTS, AND
HEALTHY GROWTH; REPAIR AS NECESSARY.
5. MONITOR NEIGHBORING ROADWAYS AND SWEEP
TRACKED MUD, DIRT, OR ROCK AS NECESSARY.
6. VERIFY THAT INLET PROTECTION IS IN PLACE AT ALL STORM
STRUCTURES ENCOUNTERED IN THE FIELD, INCLUDING ANY
NOT SHOWN ON THIS PLAN, AND REPORT ANY
UNPROTECTED OR PREVIOUSLY UNIDENTIFIED STRUCTURES
TO THE ENGINEER IMMEDIATELY.
PLAN NOTES:
1. SHOULD CONSTRUCTION TAKE PLACE PRIOR TO ISSUANCE
OF 100% IFC DRAWINGS, WAVES ASSUMES NO
INLET PROTECTION RESPONSIBILITY, LIABILITY, QUANTITY OR RELATED.
2. SURVEY PROVIDED BY LABELLA. WAVES ASSUMES NO
NOT FOR CONSTRUCTION
RESPONSIBILITY FOR ACCURACY AND CONTENT.
ST
3. UPDATED PLAN TO BE MAINTAINED BY FIELD
CONSTRUCTION TEAM, AND SHARED WITH WAVES AE ON
A WEEKLY BASIS.
ST
ST
LEGEND:
ST
ST
EXISTING MAJOR CONTOURS
ST
EXISTING MINOR CONTOURS
PROPERTY SETBACK MIN.
SHEET INFORMATION
Issued Scale for 22x34 Sheets
ST
ST
PROPERTY LINE
07/28/2026 1" = 20'
LOD LIMIT OF DISTURBANCE Project Status
SSK
SSK
SILT SOCK PERMIT - SITE PLAN
ST
INLET PROTECTION
Drawing Title
DEMO AND ESC PLAN
DEMOLITION LINE
Drawn By Checked By
ST
DEMOLITION ANW JLH
20 0 20 40 DEMOLITION OF EXISTING TREES
Drawing Number
C-002
ST
SCALE IN FEET
Page 11 of 84
Page 12
OH
W
OH
W
SITE PLAN NOTES:
OH
W
1. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF
OH
W THE TOWN OF WEST SENECA AND ALL APPLICABLE NYS
CODES AND REGULATIONS.
OH
W 2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING SITE ARCHITECTURE & ENGINEERING
CONDITIONS, DIMENSIONS, AND UTILITY LOCATIONS PRIOR
OH
W
TO COMMENCING CONSTRUCTION AND NOTIFY THE 255 ROUNDS AVE, BUFFALO NY 14225
ENGINEER OF ANY DISCREPANCIES.
OH
3. BOUNDARY AND TOPOGRAPHIC INFORMATION SHOWN IS
W
BASED ON A SURVEY PROVIDED TO WAVES ARCHITECTURE
OH
& ENGINEERING; CONTRACTOR SHALL NOT SCALE PROJECT INFORMATION
W
DRAWINGS AND SHALL USE DIMENSIONS AS NOTED.
4. PROPOSED ADDITION AND SITE IMPROVEMENTS SHALL BE Project Name
OH
W CONSTRUCTED IN ACCORDANCE WITH DIMENSIONS,
SETBACKS, AND LOCATIONS SHOWN ON THIS PLAN.
4350 SENECA STREET
OH
W
5. CONTRACTOR SHALL PROTECT ALL EXISTING TREES, BUILDING ADDITION
LANDSCAPING, STRUCTURES, AND SITE FEATURES NOT
DESIGNATED FOR REMOVAL OR RELOCATION.
Project Address
OH
W
6. RETAINING WALL DESIGN, TOP OF WALL ELEVATIONS, AND 4350 SENECA ST.
OH
ST GRADING SHALL BE PER THE GRADING PLAN (SHEET WEST SENECA, NY 14224
W
C-102).
7. ANY DISCREPANCY BETWEEN FIELD CONDITIONS AND Client Name
OH
W
ST
PLAN INFORMATION SHALL BE REPORTED TO THE ENGINEER HAVENS HOLDING GROUP
PRIOR TO PROCEEDING WITH WORK.
ST
8. ALL DISTURBED AREAS OUTSIDE THE LIMITS OF
W
Waves Project Number
OH
OH
W
CONSTRUCTION SHALL BE RESTORED TO MATCH EXISTING
CONDITIONS.
ST
9. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL
24001.00
OH
W
NECESSARY PERMITS AND APPROVALS PRIOR TO
ST
COMMENCING SITE WORK.
OHW
OH
W
ST
OH
W
ST
W
OH
OH ST
W
PROJECT ISSUE & REVISION SCHEDULE
ST
OHW
OH
W
ST
OH
W
ST
W
OH
ST
OH
W
K
AC
ST
ST
B
OH
W
SET
OHW
RD
ST
YA
OH
W
ST
AR
07/27/26 PERMIT DRAWING
' RE
W
OH
OH
25
W
ST
'
38
Description
OHW
NEW RETAINING WALL REF. C-102
W
OH
FOR TOW ELEVATIONS AND
GRADING PLAN
OHW
Date
42'-0"
1
5.00'
#
PROFESSIONAL STAMPS
NEW LOCATION FOR COOLER
& CHILLER (11'X24')
6" CONCRETE SLAB W/ 6"
CURB & FRAMED LEAN-TO
24.00'
ROOF & STICK FRAMED WALLS
11'-0"
TWO STORY BLDG. 5' SIDE YARD
ADDITION (FFE:648.5) SETBACK
2ND STORY
(FFE: 662.3)
68'-6"
COMPACTED STONE, TYP.
5'-7"
42'-0"
5.14'
NOT FOR CONSTRUCTION
NEW LANDSCAPE BED NEW LOADING
W/ 6" WIDE CURB DOCK LANDING
NEW 6" CONC. APRON
SHEET INFORMATION
LEGEND:
Issued Scale for 22x34 Sheets
07/28/2026 1" = 10
PROPERTY SETBACK MIN.
Project Status
PROPOSED RETAINING WALL PERMIT - SITE PLAN
CONCRETE PAD Drawing Title
COMPACTED STONE
SITE PLAN
Drawn By Checked By
PROPOSED ADDITION ANW JLH
10 0 10 20
LANDSCAPE BED Drawing Number
SCALE IN FEET COORDINATE
C-101
Page 12 of 84
Page 13
OH
W
OH
W
GENERAL NOTES:
OH
W
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
ELEVATIONS AND CONDITIONS PRIOR TO COMMENCING
OH
W WORK AND NOTIFY THE ENGINEER OF ANY
DISCREPANCIES.
OH
W 2. ALL GRADING SHALL CONFORM TO THE ELEVATIONS, ARCHITECTURE & ENGINEERING
SLOPES, AND DETAILS SHOWN ON THIS PLAN.
OH
W
3. EXISTING MAJOR AND MINOR CONTOURS ARE SHOWN 255 ROUNDS AVE, BUFFALO NY 14225
FOR REFERENCE ONLY; PROPOSED CONTOURS INDICATE
OH
ST FINAL GRADING CONDITION.
W
4. CONTRACTOR SHALL PROTECT EXISTING UTILITIES,
ST
LANDSCAPING, AND SITE FEATURES NOT DESIGNATED FOR PROJECT INFORMATION
OH
W
REMOVAL OR DISTURBANCE.
5. RETAINING WALL(S) SHOWN SHALL BE CONSTRUCTED PER Project Name
STRUCTURAL ENGINEER'S DESIGN AND DETAILS; THIS SHEET
ST
4350 SENECA STREET
W
OH
OH
W
IS FOR LOCATION AND GRADING REFERENCE ONLY.
ST 6. ALL DISTURBED AREAS SHALL BE RESTORED TO MATCH BUILDING ADDITION
EXISTING OR PROPOSED FINISH GRADE AND STABILIZED TO
OH
W
PREVENT EROSION.
Project Address
ST
7. SITE GRADING SHALL PROVIDE POSITIVE DRAINAGE AWAY 4350 SENECA ST.
OHW
OH
W
FROM ALL BUILDING FOUNDATIONS. WEST SENECA, NY 14224
ST 8. CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL
APPLICABLE LOCAL, COUNTY, AND NYS CODES AND Client Name
OH
W
ST
PERMITS RELATED TO GRADING, DRAINAGE, AND HAVENS HOLDING GROUP
W
RETAINING WALL CONSTRUCTION.
OH
9. ANY DISCREPANCY BETWEEN FIELD CONDITIONS AND
OH
W ST
PLAN INFORMATION SHALL BE REPORTED TO THE ENGINEER Waves Project Number
PRIOR TO PROCEEDING WITH WORK.
24001.00
ST
OHW
OH
W
ST
OH
W
ST
W
OH
ST
OH
W
CK
ST
A
ST
ETB
OH
W
PROJECT ISSUE & REVISION SCHEDULE
OHW
S
RD
ST
YA
OH
W
ST
AR
' RE
W
OH
OH
25
W
ST
'
38
OHW
07/27/26 PERMIT DRAWING
W
OH
TOW: 662.00 TOW: 669.00
661 662
FINISHED GRADE
OHW
Description
BETWEEN RETAINING
TOW: 662.00 WALLS ELEV. 662
FFE: 648.5
FFE: 648.5
TOW: 669.00
5.00'
TOW: 662.00
Date
TOW: 666.00
MATCH TO EXISTING
1
#
TOW: 663.00
CONC. PAD 5' SIDE YARD
PROFESSIONAL STAMPS
ELEV. = 648.5 SETBACK
TOW: 655.00
65
5
650
MATCH EXISTING
FFE: 648.5 FFE: 648.5
5.14'
PROPOSED LANDSCAPE BED SLOPE TO GRADE
6" WIDE CURB, MATCH NEW 6" CONC. APRON
EXISTING PAVEMENT
MATCH EXISTING
NOT FOR CONSTRUCTION
LEGEND:
EXISTING MAJOR CONTOURS SHEET INFORMATION
EXISTING MINOR CONTOURS
Issued Scale for 22x34 Sheets
07/28/2026 1" = 10'
100 PROPOSED MAJOR CONTOURS
Project Status
100 PROPOSED MINOR CONTOURS PERMIT - SITE PLAN
PROPOSED RETAINING WALL Drawing Title
CONCRETE PAD
GRADING PLAN
Drawn By Checked By
PROPOSED ADDITION ANW JLH
10 0 10 20 LANDSCAPE BED Drawing Number
SCALE IN FEET
COMPACTED STONE
C-102
Page 13 of 84
Page 14
OH
W
RETAINING WALL OR DRAINAGE PLAN NOTES:
OH
W
BUILDING FOOTING
VARIES 1. NO NYSDEC OR FEDERAL WETLANDS OR 100-YEAR
OH
W FLOODPLAIN BOUNDARIES ARE LOCATED ON OR WITHIN THE
VICINITY OF THIS SITE.
OH
W
2. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS,
OH
W SELECT STRUCTURAL FILL, TYP. GEOTEXTILE DRAINAGE
WATER, STORM, SANITARY) THAT CROSS THROUGH ANY ARCHITECTURE & ENGINEERING
FABRIC, WRAPPING TRENCH, PAVEMENT AREA. LIMITS OF SELECT BACKFILL ARE SHOWN
W/ 1FT OVERLAP AT TOP HEREON. 255 ROUNDS AVE, BUFFALO NY 14225
VARIES - MIN. 1FT
OH
W
NYSDOT No. 2 WASHED BANK
RUN GRAVEL 3. A MINIMUM OF 6 INCHES OF COVER IS REQUIRED FOR ALL
STORM SEWER PIPES LOCATED IN GRASS AREAS. A MINIMUM
PROJECT INFORMATION
OH
W
4" PERF. UNDERDRAIN-
CONNECT TO CATCH BASIN
OF 12 INCHES OF COVER IS REQUIRED FOR ALL STORM
OH
W
(SEE PLAN FOR SIZE) SEWER PIPES LOCATED IN PAVEMENT AREAS. STORM SEWER
PIPE LOCATED WITHIN THE SUB-BASE OF THE PAVEMENT IS Project Name
OH ST NOT PERMITTED. 4350 SENECA STREET
4"
W
4. NO STORMWATER SHALL DRAIN ONTO ADJOINING BUILDING ADDITION
ST
PROPERTIES.
OH
W
Project Address
OHW
ST 5. STORMWATER SYSTEMS HAVE BEEN DESIGNED FOR THE 4350 SENECA ST.
OH
W
25-YEAR STORM EVENT. WEST SENECA, NY 14224
OVERFLOW WEIR ST
6. PROVIDE STONE RIP RAP AT ALL PIPE OUTLETS FROM THE Client Name
W
INV.=645.0
OH
100-YR STORM ELEV.
OH
W
UNDISTURBED COMPACTED
DETENTION POND/INFILTRATION PRACTICES. HAVENS HOLDING GROUP
CK
SUBGRADE, TYP.
7. PROVIDE EMERGENCY OVERFLOW FOR THE DETENTION
BA
ST
ST
OH
Waves Project Number
W
POND/INFILTRATION PRACTICES AT THE 100-YEAR STORM
SET
EXISTING INFILTRATION BED ELEVATION.
OHW
24001.00
D
NOTES:
AR
ST
OH
W
A. PIPE INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURERS
8. INVERT ELEVATIONS ARE SHOWN FOR ALL CULVERTS UNDER
Y
ST
RECOMMENDATIONS.
AR
DRIVEWAYS. ALL CULVERTS UNDER DRIVEWAYS SHALL HAVE
' RE
OH
B. TRENCHING OPERATIONS SHALL INCLUDE ALL NECESSARY DEWATERING. GALVANIZED END SECTIONS.
'
W
38
W
25
OH
C. TRENCH DETAILS ARE ONLY SHOWN FOR PURPOSES OF MATERIAL
PLACEMENT AND MAXIMUM PAY LIMITS.
INVERT = 649.0 INVERT = 663.0 OH
W
D. AN OSHA APPROVED MOVABLE PROTECTIVE TRENCH SHIELD SHALL
UD UD
RUN UNDERDRAIN ALONG BE USED IN ALL UNSHEETED TRENCH AREAS.
BACK OF FOOTING
OHW
OH
UD W
UD UD UD
PROJECT ISSUE & REVISION SCHEDULE
UD
UNDERDRAIN DETAIL
UD
UD
UD
5.00'
UD
UD
TWO STORY BLDG.
ADDITION 5' SIDE YARD
UD
(FFE:648.5) SETBACK
EXISTING INFILTRATION BED 2ND STORY
07/27/26 PERMIT DRAWING
(FFE: 662.3)
UD
Description
5.14'
Date
G 5-2
RA %
1.
DE , TY
VA P.
RI
ES
1
,
#
PROFESSIONAL STAMPS
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
SHEET INFORMATION
ST
ST
Issued Scale for 22x34 Sheets
07/28/2026 1" = 20'
Project Status
PERMIT - SITE PLAN
LEGEND:
Drawing Title
PROPOSED FLOW PATH DRAINAGE PLAN
UD PROPOSED UNDERDRAIN Drawn By Checked By
ERS JLH
PROPOSED ADDITION
20 0 20 40 Drawing Number
SCALE IN FEET
INFILTRATION BED
C-103
Page 14 of 84
Page 15
OH
W
UTILITY PLAN NOTES:
OH
W
1. EXISTING CONDITIONS SHOWN FOR CLARITY
OH
W
2. A MINIMUM OF 10 FEET OF HORIZONTAL AND 18 INCHES OF
VERTICAL SEPARATION MUST BE MAINTAINED BETWEEN ALL
OH
SANITARY SEWER AND WATER SERVICES.
ARCHITECTURE & ENGINEERING
W
OH
W 3. THE ERIE COUNTY WATER AUTHORITY IS TO BE NOTIFIED A
MINIMUM OF 48 HOURS PRIOR TO STARTING THE 255 ROUNDS AVE, BUFFALO NY 14225
OH
W
CONNECTION TO THE NEW WATER SERVICE.
4. CONNECTION TO THE EXISTING WATERLINE SHALL BE MADE
OH
W
VIA A TAPPING SLEEVE AND VALVE. PROJECT INFORMATION
OH
W
5. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, Project Name
OH
WATER, STORM, SANITARY) THAT CROSS THROUGH ANY
PAVEMENT AREA. LIMITS OF SELECT BACKFILL ARE SHOWN
4350 SENECA STREET
W
ST
HEREON. BUILDING ADDITION
OH
W
6. ALL WATER, SANITARY, GAS, AND ELECTRIC SERVICES SHALL
Project Address
4350 SENECA ST.
OHW
ST
BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE
UTILITY PROVIDER'S STANDARDS AND SPECIFICATIONS. WEST SENECA, NY 14224
CK
OH
W
Client Name
A
ETB
HAVENS HOLDING GROUP
DS
ST OH
OHW
W
ST
R
YA
RELOCATION OF EXISTING ELEC. POLE
Waves Project Number
AR
'
OH
38
W
24001.00
' RE
W
25
OH
OH
W
GRASS AREA - LAWN RESTORATION
TRENCH EXCAVATION AND DRIVEWAY OR PAVEMENT
OR FIELD RESTORATION
5.00' BACKFILL LIMIT I.D. + 2'-0" SECTION SEE DETAIL
TWO STORY BLDG.
ADDITION 5' SIDE YARD SAWCUT PROJECT ISSUE & REVISION SCHEDULE
PROP. 4" PVC (FFE:648.5) SETBACK 4" TOPSOIL (MIN.) PAVEMENT
SANITARY LATERAL, 2ND STORY
TIE TO 4" EX. LATERAL (FFE: 662.3) 1'-0" MIN.
INV. EL.: 645.50
LIMITS OF SELECT COMPACTED BACKFILL CAN BE SUITABLE SEWER WARNING TAPE
BACKFILL NATIVE MATERIAL, WITH NO
AGGREGATE LARGER THAN 4" SIZE
5.14' SUBBASE STONE
SA
(NYSDOT 304.12 TYPE II)
6"
W
ALL TRENCH EXCAVATION 5' FROM THE I.D.
07/27/26 PERMIT DRAWING
EDGE OF THE PAVED SHOULDER SEWER
(MEASURED FROM THE CENTERLINE OF THE
W
4" EX. PVC SANITARY LINE HAUNCH AREA: (1/2 O.D. OF
PIPE) WILL HAVE THE EXCAVATED MATERIAL
PIPE) STONE TO BE THOROUGHLY
REMOVED AND COMPLETELY BACKFILLED
6"
COMPACTED OUT TO TRENCH
Description
1" EX. COPPER WATER SERVICE AND COMPACTED WITH SUBBASE STONE
WALLS
(NYSDOT 304.12, TYPE II).
W
UNDISTURBED EARTH SELECT GRANULAR FILL
OR ROCK (NYSDOT 203.07)
2" EX. GAS SERVICE POSSIBLE NEW 2" PLASTIC
W
WATER SERVICE
(DIRECTIONALLY BORED),
PENDING FUNDING NOTES:
ST
1. CONTRACTOR TO PROVIDE SAFE EXCAVATION; SLOPE TRENCH WALLS, USE TRENCH BOX, OR SHEETING & BRACING
Date
PER OSHA SPECIFICATIONS. TRENCH BOX OR SHEETING AND BRACING TO BE LIFTED ABOVE THE SPRING LINE OF PIPE
ST BEFORE BACKFILLING ABOVE SPRING LINE
W
2. PAVEMENT BACKFILL AND RESTORATION REQUIREMENTS SHALL APPLY TO WORK PERFORMED UNDER PROPOSED
ST ROADWAYS.
1
#
ST
3. BACKFILL OF SUITABLE MATERIAL SHALL BE COMPACTED IN 6" LIFTS.
ST
PROFESSIONAL STAMPS
W
4. ALL DISTURBED AREAS SHALL BE MULCHED OR HAVE TURF ESTABLISHMENT WITHIN 10 DAYS IF IN A GRASS AREA.
SANITARY GRAVITY SEWER AND LATERAL TRENCH DETAIL
ST
W
ST
W
ST
ST
W
ST
ST
ST
W
ST
W
ST ST
W
NOT FOR CONSTRUCTION
ST
W
ST
OHW
W
ST
WATER METER
OHW
W
SHEET INFORMATION
LEGEND:
Issued Scale for 22x34 Sheets
OHW
EXISTING WATER LINE
07/28/2026 1" = 30'
EXISTING SANITARY LINE Project Status
W
EXISTING GAS SERVICE PERMIT - SITE PLAN
OHW
OHW
EXISTING OVERHEAD ELECTRIC
Drawing Title
UTILITY PLAN
PROPOSED SANITARY LINE
SA
Drawn By Checked By
W
PROPOSED WATER LINE ERS JLH
30 0 30 60
PROPOSED ADDITION
Drawing Number
SCALE IN FEET C-104
Page 15 of 84
Page 16
WAVES
Fixture Schedule
Type
Mark Manufacturer Model Description Count Lumens Wattage Voltage Fixture Color
ARCHITECTURE & ENGINEERING
A RAB Lighting CD43-4WW LED Cylinder 6 1600 lm 16 W 120 V Black
Lighting 4350 Seneca Street
B Barn Light BLE-W-WHU16-10 Union LED 7 2000 lm 27 W 120 V Black
West Seneca, NY 14224
Electric 0-NA-NA-LED16-3 Wall Sconce
000K-DL-NA
Grand total: 13
PROJECT INFORMATION
Project Number
25023.00
Client Name
RUSTY NICKEL
BREWING
Project Name
RUSTY NICKEL
BREWERY
TYPE A
B
A Project Address
A
Enter address here
4350 SENECA ST.
WEST SENECA, NY
B
14224
PROJECT ISSUE & REVISION SCHEDULE
No. Description Date
B
A
PROFESSIONAL STAMPS
A
A A
B
B B B
TYPE B
L1 Exterior Lighting Plan Second Floor Architectural Ceiling Plan
1 2
1/8" = 1'-0" 1/8" = 1'-0"
Not For Construction
SHEET INFORMATION
Issued Scale
03/31/22 1/8" = 1'-0"
Project Status
CONCEPT DESIGN
Drawn By Checked By
AV BK
Drawing Title
Photometric Plan
Drawing Number
C105
Page 16 of 84
Page 17
OHW ABRV.
OHW BB LANDSCAPE NOTES:
LS
OHW
1. CONTACT UDIG NY (811 OR (800) 962-7962) TO LOCATE
AM EXISTING UTILITIES PRIOR TO ANY CONSTRUCTION.
OHW
MD 2. CONTRACTOR SHALL SUPPLY ALL MATERIALS FOR THE
OHW COMPLETION OF ALL WORK ITEMS ASSOCIATED WITH THIS
OHW ST 3.
INSTALLATION PER PLANS AND SPECIFICATIONS.
PRIOR TO THE START OF ANY SITE CONSTRUCTION, THE
ARCHITECTURE & ENGINEERING
OHW
ST
CONTRACTOR SHALL VERIFY ALL DIMENSIONS WITH A FIELD
CHECK AND NOTIFY OWNER REPRESENTATIVE OF ANY
255 ROUNDS AVE, BUFFALO NY 14225
DISCREPANCIES.
OHW 4. CONTRACTOR SHALL COORDINATE WITH THE LANDSCAPE
ST
ARCHITECT THE FIELD ADJUSTMENTS OF PLANT LOCATIONS PROJECT INFORMATION
THAT ARE IN CONFLICT WITH UNDERGROUND
ST
OHW OBSTRUCTIONS OR UTILITIES.
Project Name
OHW
5. PLANT SUBSTITUTIONS ARE NOT PERMITTED UNLESS
APPROVED IN ADVANCE BY THE LANDSCAPE ARCHITECT. 4350 SENECA STREET
OHW 6. PROVIDE QUANTITY SIZE, GENUS, SPECIES AND VARIETY OF BUILDING ADDITION
PLANTS INDICATED COMPLYING WITH APPLICABLE
REQUIREMENTS OF ANSI Z60.1, LATEST EDITION. Project Address
OHW 7. COMPLETELY REMOVE ALL GRASS, WEEDS AND 4350 SENECA ST.
VEGETATION FROM AREAS TO RECEIVE SOD/SEED AND WEST SENECA, NY 14224
FROM PLANT BEDS BEFORE PLACING ADDITIONAL SOIL,
OHW COMPOST, SOD/SEED OR PLANTS. PROPERLY DISPOSE OF Client Name
GRASS, WEEDS, VEGETATION OR OTHER DEBRIS OFF SITE. HAVENS HOLDING GROUP
OHW
8. CONTRACTOR SHALL PREPARE SUBGRADE AND INSTALL
OHW TOPSOIL TO LEVEL SUBGRADE AS NECESSARY, IN AREAS
DESIGNATED AS SOD/SEED ON THE PLANS. FINISHED LEVEL
OF SODDED/SEEDED AREAS SHALL BE FLUSH WITH
Waves Project Number
ADJACENT CURB, SIDEWALK OR PLANT BED. THE 24001.00
CONTRACTOR SHALL IMPORT TOPSOIL AS NECESSARY.
4" X 8" SOIL RING
AROUND PERIMETER OF 4" SHREDDED HARDWOOD
9. LANDSCAPE CONTRACTOR SHALL PREPARE PLANT BEDS
ROOT BALL, CENTER ON BARK MULCH, KEEP CLEAR WITH PLANTING SOIL, INCLUDING 2" OF COMPOST, AND
DOWNHILL SIDE OF OF STEMS, NO MORE THAN ROTOTILL AS DIRECTED IN PROJECT SPECIFICATIONS. THE
ROOT BALL FOR 240° 1" OF MULCH ON TOP OF LANDSCAPE CONTRACTOR SHALL IMPORT TOPSOIL AND
OHW
ROOT BALL
COMPOST AS NECESSARY.
10. AMEND SOIL FOR BACKFILL WITH PLANTING SOIL FOR
OPTIMUM PLANT GROWTH. REMOVE ALL ROCKS AND
FINISHED GRADE PLANTING SOIL MIX TO DEBRIS THAT ARE NOT CONDUCIVE TO PLANT GROWTH
INCLUDE 34 TOPSOIL AND 41
ORGANIC MATTER
BEFORE BACKFILLING PLANTING HOLE. PROJECT ISSUE & REVISION SCHEDULE
CORRECTED BALLED
11. SUPPLY AND APPLY FERTILIZER TABLETS (20-10-5) TO ALL
ERNST EROSION AND BURLAPPED OR SHRUBS AND TREES PER MANUFACTURER'S SPECIFICATIONS.
CONTROL SEED MIX CONTAINERIZED ROOT SEE DETAILS.
EXISTING SOIL 12. SUPPLY AND INSTALL SHREDDED HARDWOOD MULCH
BB 5 LS 11 (WITH NO ADDED COLOR) IN ALL PLANT BEDS. THE DEPTH
OHW
PLACE ROOT BALL OF MULCH SHALL BE 2 INCHES UNDER PERENNIALS AND 3"
ON EXISTING OR ORIGINAL SLOPE
SHALL PASS THROUGH IN PLANT BED AREAS CONTAINING IVY, SHRUBS AND TREES.
AM 15 RECOMPACTED SOIL
THE POINT WHERE THE DO NOT ALLOW MULCH TO CONTACT STEMS OF PLANTS,
TRUNK MEETS SOIL SHRUBS OR TREES.
LS 4
13. THE CONTRACTOR SHALL WARRANT ALL PLANTS FOR A
ST
PERIOD OF EIGHTEEN MONTHS FROM THE DATE OF
COMPLETED INSTALLATION. LANDSCAPE CONTRACTOR
NOTES: SHALL INSPECT SITE AT THE END OF WARRANTY PERIOD
ST
AND MAKE ANY NECESSARY PLANT REPLACEMENTS,
07/27/26 PERMIT DRAWING
BB 12 1. DO NOT HEAVILY PRUNE SHRUBS AT PLANTING. PRUNE ONLY CROSSOVER LIMBS, CO-DOMINANT LEADERS, AND REMOVE ANY STAKES AND BELTING FROM TREES, ADJUST
BROKEN OR DEAD BRANCHES. SOME INTERIOR TWIGS AND LATERAL BRANCHES MAY BE PRUNED, HOWEVER, DO NOT
OHW
REMOVE THE TERMINAL BUDS OF BRANCHES THAT EXTEND TO THE EDGE OF THE CROWN.
PLANTS THAT ARE NOT STRAIGHT, ETC.
14. CONTRACTOR SHALL REPAIR ANY AREAS WITHIN OR
2. PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOT BALL IN 6" LIFTS TO BRACE SHRUB. DO NOT OVER OUTSIDE OF THE PROPERTY LINES THAT ARE DAMAGED BY
MD 14
Description
COMPACT. WHEN PLANTING HOLE HAS BEEN BACKFILLED POUR WATER AROUND THE ROOT BALL TO SETTLE THE SOIL. CONSTRUCTION ACTIVITIES. DISTURBED LAWN AREAS
MD 24 MD 26 3. ROOT BALLS OF BOTH CONTAINERIZED AND BALLED AND BURLAPPED PLANTS SHALL BE CORRECTED PRIOR TO PLANTING
SHOULD RECEIVE TOPSOIL, PLACED TO FINISH GRADE,
ST PER THE ROOT BALL CORRECTION DETAILS. GRASS SEED AND STRAW MULCH.
AM 17 15. PLAN NOTES ARE NOT INTENDED TO BE A SUBSTITUTE FOR
SITE SPECIFICATIONS OR FOR APPROVAL OF INSTALLATION
PRACTICES OF THE CONTRACTOR.
SHRUB ON SLOPE
Date
N.T.S.
1
#
PROFESSIONAL STAMPS
NOT FOR CONSTRUCTION
LEGEND:
EXISTING MAJOR CONTOURS
EXISTING MINOR CONTOURS SHEET INFORMATION
100 PROPOSED MAJOR CONTOURS Issued Scale for 22x34 Sheets
07/28/2026 1" = 10'
100 PROPOSED MINOR CONTOURS
Project Status
PROPOSED RETAINING WALL PERMIT - SITE PLAN
CONCRETE PAD Drawing Title
PROPOSED ADDITION LANDSCAPE PLAN
10 0 10 20 Drawn By Checked By
LANDSCAPE BED
ANW JLH
SCALE IN FEET COMPACTED STONE Drawing Number
ERNST EROSION CONTROL
L-101
Page 17 of 84
Page 18
52' - 0"
42' - 0"
10' - 0"
ARCHITECTURE & ENGINEERING
255 ROUNDS AVE,
2' - 5"
BUFFALO NY, 14215
4' - 5"
20BBL PROJECT INFORMATION
Project Number
12' - 10"
24001.00
3' - 0"
10BBL Client Name
20BBL HAVENS HOLDING
13' - 11"
8' - 6" 15' - 0" 17' - 4" GROUP
Project Name
4350 SENECA
COMPRESSOR
7BBL STREET BUILDING
ADDITION
Project Address
10BBL GAS
4350 SENECA ST.
15' - 5"
WEST SENECA, NY
14224
6BBL
PROJECT ISSUE & REVISION SCHEDULE
WALK IN COOLER No. Description Date
14' - 0"
7' - 0"
10BBL
6BBL
KEG WASHER
3.5BBL
7' - 6"
BREW HOUSE PROFESSIONAL STAMPS
125 CONRETE PAD FOR
CHILLER
10' - 0"
1739 SF
68' - 6"
60' - 8" 15' - 2" 26' - 3"
CANNING LINE
4
____
A201
EXISTING BREWERY
123
39' - 7"
2334 SF
EXISTING WALK IN
COOLER MILL BOX
124
31' - 7"
434 SF
GRAIN STORAGE
14' - 7"
31' - 8"
CAN STORAGE
Not For Construction
77' - 0"
Room Name
SHEET INFORMATION
Issued Scale
CLOSET 07-28-2026 1/4" = 1'-0"
5' - 7"
GROSS SQUARE FOOTAGE: 7,723SF
5' - 7"
Project Status
FIRST FLOOR SQARE FOOTAGE: 5,223SF
EXISTING: 2,915SF
PERMIT SITE PLAN REVIEW
PROPOSED: 2,308SF Drawn By Checked By
SECOND FLOOR SQUARE FOOTAGE: 2,500SF
CLP BJK
Drawing Title
N Architectural First Floor Plan
21' - 0" 13' - 11" 7' - 1"
Drawing Number
42' - 0"
2
First Floor Architectural Plan
1/4" = 1'-0"
A101
Page 18 of 84
Page 19
42' - 0"
10' - 1" 10' - 11" 10' - 11" 10' - 0"
ARCHITECTURE & ENGINEERING
255 ROUNDS AVE,
BUFFALO NY, 14215
4' - 5"
PROJECT INFORMATION
11' - 3"
11' - 3"
Project Number
11' - 2" 18' - 0" 11' - 8"
24001.00
Client Name
HAVENS HOLDING
GROUP
Project Name
4350 SENECA
STREET BUILDING
ADDITION
Project Address
EXISTING PAVILLION BELOW
4350 SENECA ST.
WEST SENECA, NY
14224
PROJECT ISSUE & REVISION SCHEDULE
No. Description Date
31' - 4"
23' - 2"
23' - 4"
PROFESSIONAL STAMPS
35' - 5" 5' - 5"
OFFICEAND STORAGE
SPACE
68' - 6"
68' - 6"
2500SF
4
____
A201
16' - 3"
EXISTING ROOF BELOW
22' - 10"
22' - 7"
5' - 5"
Not For Construction
15' - 4"
11' - 5"
11' - 3"
SHEET INFORMATION
Issued Scale
GROSS SQUARE FOOTAGE: 7,723SF 07-28-2026 1/4" = 1'-0"
Project Status
FIRST FLOOR SQARE FOOTAGE: 5,223SF
EXISTING: 2,915SF PERMIT SITE PLAN REVIEW
PROPOSED: 2,308SF Drawn By Checked By
SECOND FLOOR SQUARE FOOTAGE: 2,500SF CLP JLH
9' - 5" 11' - 5" 11' - 8" 9' - 5" Drawing Title
42' - 0"
N Architectural Second Floor Plan
____
1 Drawing Number
A201
Second Floor Architectural Plan
1
1/4" = 1'-0" A102
Page 19 of 84
Page 20
ARCHITECTURE & ENGINEERING
255 ROUNDS AVE,
BUFFALO NY, 14215
PROJECT INFORMATION
Project Number
24001.00
DECRATIVE TRUSS Client Name
5' - 3"
HAVENS HOLDING
GROUP
12' - 0"
Project Name
6' - 9"
4350 SENECA
Roof Plan Roof Plan STREET BUILDING
4' - 3"
ADDITION
26' - 0" 26' - 0"
3' - 10"
Project Address
EXISTING
5' - 8"
BUILDING 4350 SENECA ST.
WEST SENECA, NY
5' - 8"
14224
7' - 0" 8' - 11" 13' - 8" 8' - 11" 14' - 5" 8' - 11" 6' - 10"
PROJECT ISSUE & REVISION SCHEDULE
3' - 0"
L2 L2 No. Description Date
5' - 0" 8' - 11" 2' - 7" 8' - 11" 2' - 10" 8' - 11" 5' - 0" 13' - 6" 13' - 6"
1 SITE PLAN PERMIT 7-28-2026
L1 L1
17' - 0" 8' - 0" 6' - 9" 6' - 4" 3' - 11"
0' - 0" 0' - 0"
42' - 0"
PROFESSIONAL STAMPS
South Architectural Building Elevation East Architectural Building Elevation
1 4
1/8" = 1'-0" 1/8" = 1'-0"
12' - 0"
12' - 0"
6' - 9"
Roof Plan Roof Plan
4' - 3"
26' - 0" 26' - 0"
3' - 10"
5' - 8"
5' - 8"
6' - 10" 8' - 11" 14' - 4" 8' - 11" 13' - 11" 8' - 11" 6' - 10"
5' - 0"
3' - 0"
42' - 0" Not For Construction
L2 L2
13' - 6" 13' - 6"
EXISTING BUILDING IN
THE FOREGROUND
13' - 6"
13' - 6"
EXISTING PAVILLION
IN THE FOREGROUND
L1 L1
SHEET INFORMATION
0' - 0" 9" 3' - 4" 8' - 3" 8' - 0" 3' - 0" 0' - 0" Issued Scale
07-28-2026 1/8" = 1'-0"
North Architectural Building Elevation West Architectural Building Elevation Project Status
2 3
1/8" = 1'-0" 1/8" = 1'-0" PERMIT SITE PLAN REVIEW
Drawn By Checked By
CLP JLH
Drawing Title
Architectural Building Elevations
Drawing Number
A201
Page 20 of 84
Page 21
Page 21 of 84
Page 22
Page 22 of 84
Page 23
07-27-26
4350 SENECA STREET BUILDING ADDITION
4350 SENECA ST, 500FT TO MAIN STREET (EAST), 1500FT TO MILL ST (WEST)
HAVENS HOLDING INC. 585-305-5199
255 ROUNDS AVE, BUFFALO NY 14215
HAVENS HOLDING INC. 585-305-5199
255 ROUNDS AVE, BUFFALO NY 14215
WAVES ARCH & ENGINGEERING 585-305-5199
255 ROUNDS AVE, BUFFALO NY 14215
135.17-3-8.2
NEW TWO STORY ADDITION TO EXISTING BUILDING. FIRST FLOOR (2,308SF), SECOND FLOOR
(2,500SF). FOR BREWERY PRODUCTION SPACE INCREASE, STORAGE, STAFF MTG. SPACE,
AND STAFF OFFICE SPACE.
0.81 ACRE NONE
SENECA STREET - 125FT
MAIN STREET - 181.35FT
C2.7.E C2.7.E
BREWERY PRODUCTION, TAP ROOM, PATIO SEATING, OFFICE
BREWERY PRODUCTION, TAP ROOM, PATIO SEATING, OFFICE
C2, C1, R-65A,R-65, R-75
X X
POSSIBLE WATER TAPPING PERMIT IF WE UP SIZE TO 2" SERVICE (NOT REQUIRED),
WOULD LIKE TO REQUEST TOWN ALLOW FOR A FILL PERMIT OF ADJACENT PARCEL
TO ALLOW SITE TOPSOIL TO BE REUSED.
Page 23 of 84
Page 24
JH
JH
PROVIDED ON SEPARATE COVER SHEET
JH
JH PROVIDED ON SEPARATE COVER SHEET
JH
JH
N.A.
JH
JH
JH
on cover sheet
JH
N.A.
JH
JH
JH
NONE
JH
N.A. TO REMAIN AS IS
JH
Page 24 of 84
Page 25
JH
DWG. C-001
JH
JH
JH
JH
JH
JH
N.A.
JH
JH
JH
JH
JH
JH
JH
N.A.
Page 25 of 84
Page 26
JH
JH
JH
JH
JH
JH
JH
JH
JH
JH
JH
JH
Havens Holding Group
jason havens
4350 seneca st
Page 26 of 84
Page 27
JH
JH
N.A.
JH
N.A.
JH
JH
JH
JH
JH
JH
JH
JH
JH
JH
N.A
Page 27 of 84
Page 28
JH
JH
NONE PROPOSED
JH
NONE PROPOSED
JH
JH
JH
JH
JH
NO NEW PIPES
JH
JH
N.A.
JH
N.A.
JH
JH
JH
JH
n.a.
Page 28 of 84
Page 29
JH
JH
JH
JH
Page 29 of 84
Page 30
Page 30 of 84
Page 31
WAVES AE
Civil Engineering · Site Development
255 Rounds Avenue, Buffalo, New York 14215 · 585-305-5199 · [email protected]
July 28, 2026
Chairperson and Members of the Planning Board
Town of West Seneca
Town Hall, 1250 Union Road
West Seneca, New York 14224
RE: Letter of Intent — Site Plan Review
4350 Seneca Street Building Addition
4350 Seneca Street, West Seneca, New York 14224 · SBL No. 135.17-3-8.2
C-2 Commercial District · Applicant: Havens Holding Group
Dear Chairperson and Members of the Board:
On behalf of Havens Holding Group, this letter accompanies the site plan application for a building addition at 4350
Seneca Street and sets out the intent of the proposed work.
Existing conditions. The property is an existing developed commercial parcel improved with a one-story building of
approximately 3,000 square feet occupied by a New York State licensed farm brewery and tasting room, together with
paved parking, circulation, and an outdoor patio and garden area. The facility hosts an average of four staff on site
during peak working hours and approximately 65 guests per day.
Proposed action. The applicant proposes a two-story addition constructed over and adjacent to the existing building,
providing 1,902 square feet of first-floor production area and 2,500 square feet of second-floor office and interior
storage area. More than 90 percent of the addition footprint lies on previously disturbed ground.
Intent. The addition houses existing operations in a larger footprint; it does not expand them. Annual production
remains at approximately 650 to 700 barrels. The replacement equipment installed in the new space reduces energy
consumption, water usage, and production time. The added area provides clear working separation between equipment
for safer operations, floor area for the larger footprint of the newer equipment, interior storage for materials presently
kept elsewhere, and an area of dedicated office and meeting space for staff who at present work from the tasting room.
Peak on-site staffing, occupant loads, and average daily patronage are unchanged, and no increase in trip generation is
anticipated. The applicant has secured a grant from Empire State Development toward furniture, fixtures, and
equipment for the brewery space, which advanced the decision to proceed with the expansion.
Zoning. The property is zoned C-2 Commercial District under Chapter 120 of the Town Code. The addition continues
the established use of the property. No rezoning, use variance, or area variance is requested. Dimensional conformance
is demonstrated in the zoning data block on the accompanying site plan.
Utilities. Existing services are retained without modification. Analyses accompanying this submission demonstrate that
the existing one-inch domestic water service is adequate for the proposed occupancy-managed demand, and that the
existing four-inch sanitary lateral and the receiving 15-inch Town main have adequate capacity. The recently upgraded
two-inch gas service is likewise adequate; no additional gas volume is required. Sanitary loading is unchanged because
occupancy and production volume are unchanged. No fire suppression service is required.
Environmental review. A completed Short Environmental Assessment Form, Part 1, accompanies this submission. The
addition exceeds by 402 square feet the 4,000 square foot threshold at 6 NYCRR 617.5(c)(9), below which such non-
residential expansion is a Type II action requiring no environmental review; the action is therefore Unlisted by a narrow
margin. We would welcome the Board's or staff's guidance as to whether the Town has adopted a supplemental Type II
list under 6 NYCRR 617.5(b) under which an action of this nature would also qualify, obviating environmental review
altogether. Should review be required, then on the record presented — a footprint more than 90 percent on previously
disturbed ground, no change of use, no increase in occupancy, production volume, or utility demand, and reduced
energy and water consumption — we respectfully request that the Board declare itself lead agency and adopt a Negative
Declaration at the same meeting, which the limited scope of the action should readily permit.
We respectfully request that this application be placed on the agenda for the Board's meeting of August 13, 2026. I will
attend to answer questions, and would welcome the opportunity to address any staff or Board comments in advance.
Respectfully submitted,
Jason Havens, P.E.
Principal Civil Design · Waves AE
New York State Professional Engineer License No. 090335
Enclosures: Site plan set · Zoning data block · Water service sizing calculation · Sanitary sewer capacity analysis · Short EAF Part 1 with
Mapper Summary Report
Page 31 of 84
Page 32
Short Environmental Assessment Form
Part 1 - Project Information
Instructions for Completing
Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as
thoroughly as possible based on current information.
Complete all items in Part 1. You may also provide any additional information you believe will be needed by or useful to the lead
agency; attach additional pages as necessary to supplement any item.
Part 1 – Project and Sponsor Information
4350 SENECA ST. BUILDING ADDITION
Name of Action or Project:
4350 SENECA ST, WEST SENECA NY 14224
Project Location (describe, and attach a location map):
EXISTING ONE STORY BREWERY
Brief Description of Proposed Action:
A TWO STORY BUILDING ADDITION ADJACENT TO THE EXISTING BUILDING
Name of Applicant or Sponsor: Telephone: 585-305-5199
HAVENS HOLDING GROUP E-Mail: [email protected]
Address:
255 ROUNDS AVE
City/PO: State: Zip Code:
BUFFALO NY 14225
1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES
administrative rule, or regulation?
If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that
may be affected in the municipality and proceed to Part 2. If No, continue to question 2.
✔
2. Does the proposed action require a permit, approval or funding from any other government Agency? NO YES
If Yes, list agency(s) name and permit or approval: BUILDING PERMIT AND TOWN FILL PERMIT
✔
3. a. Total acreage of the site of the proposed action? 0.81
acres
b. Total acreage to be physically disturbed? 0.08
acres
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor? 1.38
acres
4. Check all land uses that occur on, are adjoining or near the proposed action:
□■ Urban Rural (non-agriculture) Industrial Commercial Residential (suburban)
□ Forest Agriculture Aquatic Other(Specify):
Parkland
Page 1 of 3 SEAF 2026
Page 32 of 84
Page 33
5. Is the proposed action, NO YES N/A
a. A permitted use under the zoning regulations?
✔
b. Consistent with the adopted comprehensive plan?
✔
NO YES
6. Is the proposed action consistent with the predominant character of the existing built or natural landscape?
✔
7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? NO YES
If Yes, identify:
✔
NO YES
8. a. Will the proposed action result in a substantial increase in traffic above present levels?
✔
b. Are public transportation services available at or near the site of the proposed action?
✔
c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed
action? ✔
9. Does the proposed action meet or exceed the state energy code requirements? NO YES
If the proposed action will exceed requirements, describe design features and technologies:
✔
10. Will the proposed action connect to an existing public/private water supply? NO YES
If No, describe method for providing potable water:
✔
11. Will the proposed action connect to existing wastewater utilities? NO YES
If No, describe method for providing wastewater treatment:
✔
12. a. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district NO YES
which is listed on the National or State Register of Historic Places, or that has been determined by the
Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the ✔
State Register of Historic Places?
KNOWN NATIVE AMERICAN TERRITORY, SITE PREVIOUSLY DISTURBED
b. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for
✔
archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain NO YES
wetlands or other waterbodies regulated by a federal, state or local agency?
✔ ✔
b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody?
✔
If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres:
REF. ATTACHED (NO WETLANDS)
Page 2 of 3 SEAF 2026
Page 33 of 84
Page 34
14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply:
□ Shoreline □ Forest Agricultural/grasslands Early mid-successional
Wetland □ Urban ■ Suburban
15. Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or NO YES
Federal government as threatened or endangered?
✔
16. Is the project site located in the 100-year or 500-year flood plain? NO YES
✔
NO YES
17. Will the proposed action create storm water discharge, either from point or non-point
sources?If Yes, ✔
a. Will storm water discharges flow to adjacent properties? ✔
b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)? ✔
If Yes, briefly describe:
18. Does the proposed action include construction or other activities that would result in the impoundment of water NO YES
or other liquids (e.g., retention pond, waste lagoon, dam)?
If Yes, explain the purpose and size of the impoundment:
✔
19. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste NO YES
management facility?
If Yes, describe:
✔
20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or NO YES
completed) for hazardous waste?
If Yes, describe:
REF. ATTACHED (HAZARDOUS WASTE REMEDIATION NOT ON SITE) ✔
NO YES
21. Is the project located within, or within ½ mile of, a disadvantaged community?
✔
If No, could impacts from the project affect a disadvantaged community?
If Yes to either question in 21, answer the following question.
a. Identify the potential pollution impacts of the project, either direct or indirect, that may occur within the
disadvantaged community (e.g., wastewater discharges, air emissions, noise, odors, solid or hazardous waste
generation or management):
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF
MY KNOWLEDGE
Applicant/sponsor/name: Jason Havens, P.E. Date: 07-28-26
Signature: Title: Applicant / Owner / Engineer
Page 3 of 3 SEAF 2026
Page 34 of 84
Page 35
EAF Mapper Summary Report Tuesday, July 28, 2026 8:18 PM
Disclaimer: The EAF Mapper is a screening tool intended to assist
project sponsors and reviewing agencies in preparing an environmental
assessment form (EAF). Not all questions asked in the EAF are
answered by the EAF Mapper. Additional information on any EAF
question can be obtained by consulting the EAF Workbooks. Although
the EAF Mapper provides the most up-to-date digital data available to
DEC, you may also need to contact local or other data sources to
confirm data provided by the Mapper or to obtain data not provided by
the Mapper.
Part 1 / Question 7 [Critical Environmental No
Area]
Part 1 / Question 12a [National or State No
Register of Historic Places or State Eligible
Sites]
Part 1 / Question 12b [Archeological Sites] Yes
Part 1 / Question 13a [Wetlands or Other Yes - Digital mapping information on local, New York State, and federal
Regulated Waterbodies] wetlands and waterbodies is known to be incomplete. Refer to the EAF
Workbook.
Part 1 / Question 15 [Threatened or No
Endangered Animal]
Part 1 / Question 16 [100 or 500 Year No
Floodplain]
Part 1 / Question 20 [Remediation Site] Yes
Part 1 / Question 21 [Disadvantaged No
Community]
****SEE ATTACHED****
Short Environmental Assessment Form - EAF Mapper Summary Report Page 35 of 184
Page 36
Q20 - No remediation
identified on site, via
resource maps
site location
Q13a - No wetlands
nor floor plains on
site. site location
Page 36 of 84
Page 37
Page 37 of 84
Page 38
Page 38 of 84
Page 39
Page 39 of 84
Page 40
WATER SERVICE SIZING CALCULATION & JUSTIFICATION
Domestic Water Service — Submitted for Site Plan Review
Project 4350 Seneca Street Building Addition
Location 4350 Seneca Street, West Seneca, NY 14224 (Erie County)
Prepared for Havens Holding Group
Prepared by Jason Havens, P.E., Principal Civil Design — NYS Lic. No. 090335 (Exp. 12/31/2026)
Date July 26, 2026
Reviewing authority Town of West Seneca · Water purveyor: Erie County Water Authority
1. Purpose & Scope
This calculation demonstrates that the existing one-inch (1") domestic water service is adequate to serve the
proposed building addition under its intended pattern of occupancy, and documents a recommended basis for
future upsizing should occupancy, demand, or funding conditions change. Scope is limited to the domestic water
service (public main to the building meter/entry); interior distribution is confirmed at the plumbing permit stage,
and no fire-protection demand is included (Section 8).
2. Code Basis & References
● NYS Plumbing Code (IPC-based) — §604.3 fixture flow-pressure requirements; §604.8 PRV threshold;
§606.5 booster/pressure requirements.
● IPC Appendix E — segmented-loss sizing method and pressure-balance relationship; Tables E103.3(2)/(3)
— WSFU load values and WSFU-to-demand conversion (Hunter's curve).
● Hazen-Williams friction relation; 8 ft/s cold-water velocity ceiling. Where purveyor standards are more
restrictive than the model code, the purveyor's standards govern.
3. Existing Service & Design Criteria
Parameter Value Source / note
Existing service — material & size 1" copper, Type L confirmed (existing)
Service internal diameter 1.025 in Type L bore
Hazen-Williams C 140 copper
Service developed length 90 ft (developed) incl. fitting allowance —
confirmed
Min. daily available pressure 67 psi purveyor / project data
Static (no-flow) pressure 72 psi purveyor / project data
Highest fixture above service entry 13 ft — 2nd-floor office (non- see Section 7 note
governing)
Water meter loss @ design flow 2.5 psi displacement meter
Backflow assembly None no assembly on this
service
Velocity ceiling 8 ft/s cold-water service
Predominant flushing system Flush tanks governs demand curve
4. Fixture Schedule & WSFU Tally
Brewery fill offset. Brewery fill demand occurs within the daytime occupancy over a discrete ~45-minute fill
window during which the kitchen does not operate. The brewery fill therefore directly offsets the kitchen / break-
sink demand within Group A and is not additive to the group's peak fixture-unit load.
Page 40 of 84
Page 41
Fixtures are organized into two occupancy groups operating in non-overlapping time windows (Section 5). Load
values are public-use figures per Table E103.3(2).
Group A — Daytime occupancy (incl. brewery operations)
Fixture (public) WSFU ea. Qty Subtotal WSFU
Water closet, flush tank 5 2 10
Lavatory 2 2 4
Kitchen / break sink (offset by brewery fill) 4 1 4
Group A total 18 WSFU
Group B — Evening occupancy
Fixture (public) WSFU ea. Qty Subtotal WSFU
Water closet, flush tank 5 2 10
Lavatory 2 2 4
Service / mop sink 3 1 3
Group B total 17 WSFU
An exterior hose bibb serves maintenance use only, operated outside occupied restroom peaks; it is non-coincident
with the interior peak and not additive. There is no simultaneous irrigation demand.
5. Demand Analysis — Non-Coincident Use
Fixture units are converted to a probable peak demand via Hunter's curve, Table E103.3(3), for a flush-tank system.
Demand basis Total WSFU Peak demand
Design — non-coincident, governing group (Group A) 18 18.8 gpm
Basis of the non-coincident demand. Group A (daytime, including brewery operations) and Group B (evening)
operate in separate, non-overlapping time windows. Simultaneous use of both groups is not possible: the facility
does not brew during events, so an evening event cannot coincide with daytime brewery / kitchen demand. The
service therefore never carries the two groups' combined load — the peak instantaneous demand is that of the
single larger group, Group A at 18 WSFU → 18.8 gpm, not the arithmetic sum. Within Group A, the ~45-minute
brewery fill occurs while the kitchen is offline and directly offsets the kitchen demand (Section 4), so it is not
additive. This non-coincident basis is applied in addition to the simultaneity probability already embedded in
Hunter's curve.
6. Service Capacity — Velocity Check
Velocity governs the 1" service and is independent of available pressure: V = 0.4085 × Q ÷ d², d = 1.025 in.
Demand basis Flow Velocity in 1" service
Design — non-coincident 18.8 gpm 7.31 ft/s — WITHIN 8 ft/s
✓
Simultaneous A + B (precluded — reference) 24.9 gpm 9.68 ft/s — over 8 ft/s
At the design (non-coincident) demand the service operates at 7.31 ft/s — 91% of its velocity ceiling, within limits.
The simultaneous condition, precluded by the operating configuration, is shown for reference only.
7. Pressure Balance & Residual Pressure
Per IPC Appendix E, source-to-building losses at the 18.8 gpm design demand are subtracted from available
pressure to confirm adequate residual pressure remains.
Component psi Running
Available min. daily pressure at main 67.0 67.0
Page 41 of 84
Page 42
Component psi Running
− Water meter (displacement) 2.5 64.5
− Service friction (1" copper, 18.8 gpm) 8.8 55.7
Residual pressure at building entry 55.7
− Critical fixture requirement (flush-tank WC, §604.3) 20.0 35.7
Pressure available for interior distribution 35.7 psi ✓
No elevation head is carried. The site and service run are essentially flat, and the governing fixture is the at-grade
flush-tank water closet (20 psi). The highest fixtures — 2nd-floor office lavatories, 13 ft above entry, requiring only
8 psi — remain non-governing even with their ~5.6 psi static lift (8 + 5.6 = 13.6 < 20 psi). Static pressure (72 psi) is
below the 80 psi §604.8 threshold, so no PRV is required; 35.7 psi remains for interior piping friction after the
critical fixture — ample for a building of this size, confirmed at the plumbing permit stage.
8. Fire Suppression Determination
Automatic fire-sprinkler protection is not required for this building. This has been confirmed based on the
occupancy classification, the building area and height remaining within the limits permitted for non-sprinklered
construction, and the fire-resistance-rated separations incorporated in the design. Accordingly, no fire-protection
flow is added and the service is sized for domestic demand only — a material factor in the adequacy of the 1"
service. Any future introduction of a fire-suppression requirement would require re-evaluation (Section 10).
9. Conclusion
The existing 1" copper domestic water service is adequate for the proposed building addition under its non-
coincident daytime/evening pattern of use:
● Design demand: 18.8 gpm — velocity 7.31 ft/s, within the 8 ft/s ceiling.
● Residual at building: 55.7 psi, leaving 35.7 psi for interior distribution after the critical fixture — ample.
● No PRV required (static 72 < 80 psi); no booster; no backflow assembly; no fire-protection demand;
simultaneous use of both groups is not possible.
10. Recommendation — Future Service Upsizing
The 1" service is adequate for present conditions but carries little reserve (91% of its velocity ceiling at design
demand). The following would render it inadequate and should trigger upsizing:
● Simultaneous (rather than alternating) use of both occupancy groups.
● Change of tenant or occupancy, added fixtures, or conversion from flush tanks to flushometer valves.
● Increased brewery production or overlapping fill demand, added irrigation, or any future fire-suppression
requirement.
Upsizing is recommended as a programmed future capital improvement, undertaken when funding is available and
ideally coordinated with street/main work, a tenant fit-out, or re-occupancy.
Service size (copper) Velocity @ 24.9 gpm* Capacity @ 8 ft/s Headroom vs. present
1" (existing) 9.7 ft/s (over) ~20 gpm Occupancy managed
1½" 4.5 ft/s ~44 gpm Simultaneous use OK
2" 2.6 ft/s ~77 gpm long-term growth + fire
option
* full simultaneous demand (reference). A 1½" service carries full simultaneous demand comfortably (4.5 ft/s); a 2" service adds reserve
for future fixtures, irrigation, brewery growth, or a future fire service. If the service trench or building entry is disturbed under this
project, an oversized sleeve/entry penetration now materially reduces the future upsizing cost.
11. Assumptions, Limitations & Certification
● Existing service (1" Type L copper), developed length, available/static pressures (67/72 psi), and meter
loss (2.5 psi) are per the Engineer's project data and field information; a purveyor pressure-availability
letter is recommended for the record.
Page 42 of 84
Page 43
● Meter loss is a displacement-meter typical at design flow; confirm against the meter headloss curve.
● Addresses the water service only; interior distribution sizing is completed at the plumbing permit stage.
Fire-protection demand is excluded per Section 8.
● Prepared in support of site plan review; becomes a stamped design upon application of the Engineer of
Record's seal below.
Prepared by: Engineer of Record / Seal:
_______________________________ _______________________________
Jason Havens, P.E., Principal Civil Design Jason Havens, P.E. · NYS Lic. No. 090335
Date: July 26, 2026 Exp. 12/31/2026 P.E. Seal / Date:
Page 43 of 84
Page 44
SANITARY SEWER CAPACITY ANALYSIS
Prepared in Support of Site Plan Review
4350 Seneca Street Building Addition — Town of West Seneca, New York
Project Name 4350 Seneca Street Building Addition
Site Address 4350 Seneca Street, West Seneca, NY 14224
Tax Parcel / SBL 135.17-3-8.2
Sanitary Service Town of West Seneca sewers — 4″ PVC service connection at Seneca Street to
the existing 15″ public main
Reviewing Authority Town of West Seneca Planning Board
Prepared For Havens Holding Group
Prepared By Waves AE — Jason Havens, P.E., NYS License No. 090335
Date July 26, 2026
SUMMARY. The proposed addition adds building area only; occupant loads and facility operations are
unchanged. Sanitary demand is therefore unchanged from existing conditions (≈ 730 gpd average, ≈ 2 gpm
peak). The existing 4″ service connection (≈ 87 gpm capacity) and the 15″ public main both have substantial
excess capacity, and the 15″ main already conveys the facility’s current flow. No sanitary capacity upgrade is
required.
Sanitary Sewer Capacity Analysis • 4350 Seneca Street Building Addition • Page 1
Page 44 of 84
Page 45
1. Purpose and Scope
This analysis evaluates the capacity of the existing 4″ sanitary sewer service connection and the receiving 15″
public sewer main relative to the sanitary demand of the facility at 4350 Seneca Street, in support of site plan
review before the Town of West Seneca Planning Board. Sanitary demand is based on occupant load. Because
the proposed addition does not change occupant loads or facility operations, the analysis confirms that the
existing service and main remain adequate. Stormwater is addressed separately in the project plans and is
outside this scope.
2. Existing Conditions
The site is improved with an existing 3,000 SF building operating with 4 employees and an average of 65
guests per day. Sanitary service is provided by an existing 4″ PVC service connection at Seneca Street
discharging to the Town of West Seneca 15″ public sewer main, which currently conveys the facility’s flow
without issue.
Existing parameter Basis Quantity
Building area Gross floor area 3,000 SF
Staff Employees 4
Patrons Guests per day (avg) 65
3. Proposed Conditions
The project maintains the existing structure and constructs a new two-story addition over and adjacent to it:
1,902 SF of first-floor operations space (Commercial) and 2,500 SF of second-floor office and storage
(Business Group B). Total building area becomes 7,402 SF.
The addition provides additional space for safer operations — greater clearance between equipment, a larger
footprint for newer advanced equipment, and indoor storage of materials and equipment — together with
proper meeting and office space for existing staff, who currently use the taproom. It does not add occupant
load: staffing and guest counts remain the same, and the facility’s operations are unchanged (and if anything
reduced with newer equipment). Sanitary demand is therefore unchanged from existing conditions.
Component Use / classification Area
Existing structure (retained) Existing establishment 3,000 SF
Addition — 1st floor Operations space (Commercial) 1,902 SF
Addition — 2nd floor Office / storage (Group B) 2,500 SF
Sanitary Sewer Capacity Analysis • 4350 Seneca Street Building Addition • Page 2
Page 45 of 84
Page 46
4. Methodology and References
Sanitary demand is estimated from occupant load using unit design-flow rates consistent with the
Recommended Standards for Wastewater Facilities (Ten State Standards) and the NYS Design Standards for
Intermediate Sized Wastewater Treatment Systems. Sewer hydraulic capacity is computed with Manning’s
equation.
4.1 Average and peak demand
ADF = Σ ( unit flow rate × occupancy ) Peak = ADF × PF
A peak factor (PF) of 4.0 is applied to the small demand, consistent with the Ten State peaking curve for low
tributary populations.
4.2 Sewer hydraulic capacity
Qₘₐₓ = (1.49 / n) × A × R2/3 × S1/2
Capacities below use the code / standard minimum design slope for each pipe as a conservative basis, so no
field slope data is required; actual capacity is greater. n = 0.013 (PVC service); n = 0.011 (lined 15″ main).
5. Sanitary Demand (Occupant Load)
Representative unit rates: employees 20 gpd each; guests 10 gpd each. Occupancy per applicant; unchanged
by the proposed addition. The second-floor office serves existing staff and adds no occupant load.
Source Rate Qty ADF (gpd)
Employees 20 gpd/emp 4 80
Guests / patrons 10 gpd/guest 65 650
Average daily demand (ADF) 730
Peak demand (PF = 4.0) 2,920 gpd ≈ 2.0 gpm
Existing and proposed demand are identical (≈ 730 gpd average / ≈ 2.0 gpm peak). The addition produces no
increase in sanitary demand. Conversions: 1 gpm = 1,440 gpd; 1 cfs = 448.8 gpm.
Sanitary Sewer Capacity Analysis • 4350 Seneca Street Building Addition • Page 3
Page 46 of 84
Page 47
6. Capacity Analysis
6.1 Existing 4″ PVC service connection
Full-flow capacity of the 4″ PVC service (n = 0.013) at the minimum building-sewer slope of 1/8″ per foot (S =
0.0104 ft/ft):
Diameter / area / R 4″ (0.333 ft); A = 0.087 ft²; R = 0.083 ft
Full-flow capacity ≈ 0.19 cfs = 87 gpm = 126,000 gpd
Velocity (full) 2.2 ft/s (≥ 2.0 ft/s minimum ✓)
Peak demand of ≈ 2.0 gpm is about 2% of the 4″ service’s minimum full-flow capacity. The existing service has
ample excess capacity, with more than 85 gpm to spare. At a steeper (typical) slope of 1/4″ per foot the
capacity rises to ≈ 123 gpm.
6.2 Existing 15″ public sewer main
At the minimum design slope for a 15″ sewer (S = 0.15%), and using a conservative lined effective diameter (n
= 0.011), the 15″ main’s full-flow capacity is on the order of:
Full-flow capacity (minimum slope, conservative) ≈ 1,100 gpm ≈ 1.6 MGD
Velocity (full) ≥ 2.0 ft/s ✓
The 15″ main already conveys the facility’s current flow as part of a much larger tributary area. Because the
project adds no sanitary demand, it places no additional load on the main. Even at the conservative
minimum-slope capacity above, the facility’s peak demand is a negligible fraction (well under 1%) of the
main’s capacity.
7. Conclusions
● No increase in sanitary demand. The addition adds building area only; occupant loads and
operations are unchanged, so demand remains ≈ 730 gpd average / ≈ 2.0 gpm peak.
● 4″ service is adequate. Minimum full-flow capacity ≈ 87 gpm; peak demand uses ≈ 2%, leaving
substantial excess capacity.
● 15″ main is adequate. Capacity on the order of 1,100+ gpm; the main already conveys the facility’s
flow and receives no additional load from this project.
● No upgrade required. The existing 4″ service and 15″ public main have adequate capacity for the
facility as proposed.
Appendix A — Representative Unit Design Flow Rates
Representative values for occupancy-based estimating, consistent with the referenced standards.
Sanitary Sewer Capacity Analysis • 4350 Seneca Street Building Addition • Page 4
Page 47 of 84
Page 48
Use / establishment Representative unit flow
Employee (per shift) 15–20 gpd/employee
Taproom / establishment guest 5–10 gpd/guest
Office (Business Group B) 15–20 gpd/employee (≈ 0.10 gpd/SF)
References
● Great Lakes–Upper Mississippi River Board, Recommended Standards for Wastewater Facilities (Ten
State Standards).
● NYSDEC, Design Standards for Intermediate Sized Wastewater Treatment Systems (2014).
● Town of West Seneca sanitary sewer standards.
● Manning’s equation for gravity-sewer hydraulic capacity.
Certification
I certify that this sanitary sewer capacity analysis was prepared by me or under my direct supervision and, to
the best of my knowledge, meets applicable standards.
Jason Havens, P.E. — Waves AE NYS P.E. License No. 090335 Date: 07-26-26
______________
EXP. 12-31-2026
[ P.E. SEAL ]
Sanitary Sewer Capacity Analysis • 4350 Seneca Street Building Addition • Page 5
Page 48 of 84
Page 49
WAVES AE
Engineering Memorandum
TO: Town of West Seneca Planning Board
FROM: Jason Havens, P.E. — Waves AE
DATE: July 28, 2026
PROJECT: 4350 Seneca Street — Site Plan Application
RE: Stormwater Management Summary (Pre- vs. Post-Construction Analysis)
Purpose
This memorandum summarizes the stormwater management analysis prepared in support of the Town of West
Seneca Site Plan Review application for the referenced project. Total soil disturbance associated with this project is
less than one (1) acre. Per the Town of West Seneca Site Plan Application Checklist (Appendix A, Section IV –
Drainage/Grading), sites with less than one acre of disturbance are required to detain the difference between the 10-
year pre-developed storm and the 25-year post-developed storm, with supporting calculations provided. Stormwater
conveyance for this project has additionally been designed for the 25-year storm event, exceeding the Town's 10-year
minimum conveyance design standard.
Project Description
The project consists of pavilion, walkway, and paver improvements at 4350 Seneca Street. Site soils are classified as
Hydrologic Soil Group D. Post-development runoff is managed through a series of on-site infiltration practices —
three pea gravel infiltration beds (3.0-ft, 2.5-ft, and 5.7-ft effective depths) and one sand-over-engineered-fill
infiltration bed (4.0-ft) — prior to discharge. Overflow from these practices is conveyed to one of two site discharge
points: Seneca Street and an on-site detention basin.
Methodology
Hydrologic modeling was performed using HydroCAD 10.20-7a, applying the SCS TR-20 unit hydrograph method with
weighted Curve Numbers (CN) for each subcatchment. Rainfall depths were derived from NOAA Atlas 14 point
precipitation data (Type II, 24-hour distribution). Pre-construction and post-construction conditions were each
modeled for the 10-year and 25-year design storms, with peak flow and volume compared at two discharge points:
Link AP1 (Seneca Street) and Link AP2 (Basin).
Results Summary
Table 1 summarizes peak discharge and runoff volume at each site discharge point for the governing storm events,
comparing the 10-year pre-developed condition (the Town's allowable release standard) against the 25-year post-
developed condition.
Table 1: Pre- vs. Post-Development Peak Flow & Volume Comparison
10-yr Pre-Dev 25-yr Post-Dev 10-yr Pre-Dev 25-yr Post-Dev
Discharge Point
Peak (cfs) Peak (cfs) Volume (cf) Volume (cf)
Seneca Street (AP1) 2.20 2.12 4,600 4,750
Basin (AP2) 1.39 0.52 2,309 526
Table 2: On-Site Infiltration Practice Performance — 25-Year Storm
Page 49 of 84
Page 50
Primary
Practice Peak Elevation (ft) Storage Provided (cf) Exfiltration Rate
Outflow (cfs)
Pond 1P – Infil. Bed (Pea Gravel, 3.0') 646.82 340 0.30 in/hr 0.00
Pond 4P – Infil. Bed Sand/Fill (4.0') 648.14 293 0.40 in/hr 0.52*
Pond 5P – Infil. Bed (Pea Gravel, 2.5') 648.51 100 0.30 in/hr 0.02
Pond 6P – Infil. Bed (Pea Gravel, 5.7') 645.64 2,521 0.30 in/hr 0.00
*Pond 4P's primary outflow is reported as 0.52 cfs at the pond-summary level but 0.31 cfs at the outlet-device level within the HydroCAD output;
this discrepancy has not yet been reconciled (see Findings).
Findings
Based on the current HydroCAD models, the 25-year post-developed peak discharge does not exceed the 10-year pre-
developed peak at either site discharge point: 2.12 cfs vs. 2.20 cfs at Seneca Street (AP1), and 0.52 cfs vs. 1.39 cfs at
the Basin (AP2). Two items remain open and are noted for completeness: a 150 cf residual difference between pre-
and post-developed volume at Seneca Street, and unresolved HydroCAD storage/routing warnings on Ponds 1P, 4P,
and 5P.
Recommendation
It is recommended that the Planning Board accept this memorandum and the accompanying HydroCAD calculations
as the current basis of stormwater design for this site plan application.
Respectfully submitted, [ P.E. Seal / Stamp ]
____________________________
Jason Havens, P.E.
Waves AE
Page 50 of 84
Page 51
AP2
BASIN
1
2
Subcat 1
Subcat 2
AP1
SENECA ST
Subcat Reach Pond Link Routing Diagram for Rustys_Pre-Construction - Copy
Prepared by Waves AE, Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC
Page 51 of 84
Page 52
Rustys_Pre-Construction - Copy
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 2
Project Notes
Defined 7 rainfall events from NY-Lake Mariner IDF
Defined 6 rainfall events from NY-Lake Mariner IDF
Defined 7 rainfall events from NY-PPA IDF
Defined 7 rainfall events from NY - Rusty's IDF
Page 52 of 84
Page 53
Rustys_Pre-Construction - Copy
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 3
Rainfall Events Listing (selected events)
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 10-yr Type II 24-hr Default 24.00 1 3.14 2
Page 53 of 84
Page 54
Rustys_Pre-Construction - Copy
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 4
Area Listing (all nodes)
Area CN Description
(sq-ft) (subcatchment-numbers)
14,239 73 Brush, Good, HSG D (1, 2)
24,675 98 Paved parking, HSG D (1, 2)
3,277 98 Unconnected pavement, HSG D (2)
42,190 90 TOTAL AREA
Page 54 of 84
Page 55
Rustys_Pre-Construction - Copy
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 5
Soil Listing (all nodes)
Area Soil Subcatchment
(sq-ft) Group Numbers
0 HSG A
0 HSG B
0 HSG C
42,190 HSG D 1, 2
0 Other
42,190 TOTAL AREA
Page 55 of 84
Page 56
Rustys_Pre-Construction - Copy
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 6
Ground Covers (all nodes)
HSG-A HSG-B HSG-C HSG-D Other Total Ground Subc
(sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) Cover Num
0 0 0 14,239 0 14,239 Brush, Good
0 0 0 24,675 0 24,675 Paved parking
0 0 0 3,277 0 3,277 Unconnected
pavement
0 0 0 42,190 0 42,190 TOTAL AREA
Page 56 of 84
Page 57
Rustys_Pre-Construction - Copy Type II 24-hr 10-yr Rainfall=3.14"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 7
Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1: Subcat 1 Runoff Area=24,656 sf 79.93% Impervious Runoff Depth>2.24"
Tc=6.0 min CN=93 Runoff=2.20 cfs 4,600 cf
Subcatchment 2: Subcat 2 Runoff Area=17,535 sf 47.01% Impervious Runoff Depth>1.58"
Tc=0.0 min CN=85 Runoff=1.39 cfs 2,309 cf
Link AP1: SENECA ST Inflow=2.20 cfs 4,600 cf
Primary=2.20 cfs 4,600 cf
Link AP2: BASIN Inflow=1.39 cfs 2,309 cf
Primary=1.39 cfs 2,309 cf
Total Runoff Area = 42,190 sf Runoff Volume = 6,909 cf Average Runoff Depth = 1.97"
33.75% Pervious = 14,239 sf 66.25% Impervious = 27,952 sf
Page 57 of 84
Page 58
Rustys_Pre-Construction - Copy Type II 24-hr 10-yr Rainfall=3.14"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment 1: Subcat 1
Runoff = 2.20 cfs @ 11.96 hrs, Volume= 4,600 cf, Depth> 2.24"
Routed to Link AP1 : SENECA ST
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 10-yr Rainfall=3.14"
Area (sf) CN Description
4,948 73 Brush, Good, HSG D
19,708 98 Paved parking, HSG D
24,656 93 Weighted Average
4,948 20.07% Pervious Area
19,708 79.93% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 1: Subcat 1
Hydrograph
Runoff
2.20 cfs
Type II 24-hr
2
10-yr Rainfall=3.14"
Runoff Area=24,656 sf
Runoff Volume=4,600 cf
Flow (cfs)
Runoff Depth>2.24"
Tc=6.0 min
1
CN=93
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 58 of 84
Page 59
Rustys_Pre-Construction - Copy Type II 24-hr 10-yr Rainfall=3.14"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 9
Summary for Subcatchment 2: Subcat 2
[46] Hint: Tc=0 (Instant runoff peak depends on dt)
Runoff = 1.39 cfs @ 11.89 hrs, Volume= 2,309 cf, Depth> 1.58"
Routed to Link AP2 : BASIN
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 10-yr Rainfall=3.14"
Area (sf) CN Description
9,291 73 Brush, Good, HSG D
4,967 98 Paved parking, HSG D
3,277 98 Unconnected pavement, HSG D
17,535 85 Weighted Average
9,291 52.99% Pervious Area
8,243 47.01% Impervious Area
3,277 39.75% Unconnected
Subcatchment 2: Subcat 2
Hydrograph
Runoff
1.39 cfs
Type II 24-hr
10-yr Rainfall=3.14"
Runoff Area=17,535 sf
1
Runoff Volume=2,309 cf
Flow (cfs)
Runoff Depth>1.58"
Tc=0.0 min
CN=85
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 59 of 84
Page 60
Rustys_Pre-Construction - Copy Type II 24-hr 10-yr Rainfall=3.14"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Link AP1: SENECA ST
Inflow Area = 24,656 sf, 79.93% Impervious, Inflow Depth > 2.24" for 10-yr event
Inflow = 2.20 cfs @ 11.96 hrs, Volume= 4,600 cf
Primary = 2.20 cfs @ 11.96 hrs, Volume= 4,600 cf, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Link AP1: SENECA ST
Hydrograph
Inflow
2.20 cfs Primary
2.20 cfs
Inflow Area=24,656 sf
2
Flow (cfs)
1
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 60 of 84
Page 61
Rustys_Pre-Construction - Copy Type II 24-hr 10-yr Rainfall=3.14"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Link AP2: BASIN
Inflow Area = 17,535 sf, 47.01% Impervious, Inflow Depth > 1.58" for 10-yr event
Inflow = 1.39 cfs @ 11.89 hrs, Volume= 2,309 cf
Primary = 1.39 cfs @ 11.89 hrs, Volume= 2,309 cf, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Link AP2: BASIN
Hydrograph
Inflow
1.39 cfs Primary
1.39 cfs
Inflow Area=17,535 sf
1
Flow (cfs)
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 61 of 84
Page 62
AP2
BASIN 6P
INFIL. BED 5
5
2
Subcat 5
1P Subcat 2
INFIL. BED
4P 5P
4
INFIL. BED SAND INFIL. BED
Subcat 4
3
6 1
Subcat 3
Subcat 6 Subcat 1
AP1
SENECA ST
Subcat Reach Pond Link Routing Diagram for Rustys_Post-Construction - Copy
Prepared by Waves AE, Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC
Page 62 of 84
Page 63
Rustys_Post-Construction - Copy
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 2
Project Notes
Defined 7 rainfall events from NY-Lake Mariner IDF
Defined 6 rainfall events from NY-Lake Mariner IDF
Defined 7 rainfall events from NY-PPA IDF
Defined 7 rainfall events from NY - Rusty's IDF
Page 63 of 84
Page 64
Rustys_Post-Construction - Copy
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 3
Rainfall Events Listing (selected events)
Event# Event Storm Type Curve Mode Duration B/B Depth AMC
Name (hours) (inches)
1 25-yr Type II 24-hr Default 24.00 1 3.84 2
Page 64 of 84
Page 65
Rustys_Post-Construction - Copy
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 4
Area Listing (all nodes)
Area CN Description
(sq-ft) (subcatchment-numbers)
13,144 73 Brush, Good, HSG D (1, 2, 3, 4, 5, 6)
25,787 98 Paved parking, HSG D (1, 2, 3, 4, 5, 6)
3,266 98 Unconnected pavement, HSG D (2, 6)
42,197 90 TOTAL AREA
Page 65 of 84
Page 66
Rustys_Post-Construction - Copy
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 5
Soil Listing (all nodes)
Area Soil Subcatchment
(sq-ft) Group Numbers
0 HSG A
0 HSG B
0 HSG C
42,197 HSG D 1, 2, 3, 4, 5, 6
0 Other
42,197 TOTAL AREA
Page 66 of 84
Page 67
Rustys_Post-Construction - Copy
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 6
Ground Covers (all nodes)
HSG-A HSG-B HSG-C HSG-D Other Total Ground Subc
(sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) Cover Num
0 0 0 13,144 0 13,144 Brush, Good
0 0 0 25,787 0 25,787 Paved parking
0 0 0 3,266 0 3,266 Unconnected
pavement
0 0 0 42,197 0 42,197 TOTAL AREA
Page 67 of 84
Page 68
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 7
Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Subcatchment 1: Subcat 1 Runoff Area=17,571 sf 95.83% Impervious Runoff Depth>3.24"
Tc=6.0 min CN=97 Runoff=2.12 cfs 4,750 cf
Subcatchment 2: Subcat 2 Runoff Area=16,257 sf 34.84% Impervious Runoff Depth>1.91"
Tc=6.0 min CN=82 Runoff=1.32 cfs 2,586 cf
Subcatchment 3: Subcat 3 Runoff Area=630 sf 99.39% Impervious Runoff Depth>3.32"
Tc=6.0 min CN=98 Runoff=0.08 cfs 175 cf
Subcatchment 4: Subcat 4 Runoff Area=1,852 sf 97.97% Impervious Runoff Depth>3.24"
Tc=6.0 min CN=97 Runoff=0.22 cfs 500 cf
Subcatchment 5: Subcat 5 Runoff Area=2,495 sf 28.92% Impervious Runoff Depth>1.76"
Tc=0.0 min CN=80 Runoff=0.22 cfs 366 cf
Subcatchment 6: Subcat 6 Runoff Area=3,392 sf 99.91% Impervious Runoff Depth>3.32"
Tc=0.0 min CN=98 Runoff=0.48 cfs 940 cf
Pond 1P: INFIL. BED Peak Elev=646.82' Storage=340 cf Inflow=0.22 cfs 538 cf
Discarded=0.00 cfs 221 cf Primary=0.00 cfs 0 cf Outflow=0.00 cfs 221 cf
Pond 4P: INFIL. BED SAND Peak Elev=648.14' Storage=293 cf Inflow=0.48 cfs 940 cf
Discarded=0.00 cfs 121 cf Primary=0.52 cfs 526 cf Outflow=0.52 cfs 647 cf
Pond 5P: INFIL. BED Peak Elev=648.51' Storage=100 cf Inflow=0.08 cfs 175 cf
Discarded=0.00 cfs 37 cf Primary=0.02 cfs 38 cf Outflow=0.02 cfs 75 cf
Pond 6P: INFIL. BED 5 Peak Elev=645.64' Storage=2,521 cf Inflow=1.44 cfs 2,953 cf
Discarded=0.01 cfs 431 cf Primary=0.00 cfs 0 cf Outflow=0.01 cfs 431 cf
Link AP1: SENECA ST Inflow=2.12 cfs 4,750 cf
Primary=2.12 cfs 4,750 cf
Link AP2: BASIN Inflow=0.52 cfs 526 cf
Primary=0.52 cfs 526 cf
Total Runoff Area = 42,197 sf Runoff Volume = 9,317 cf Average Runoff Depth = 2.65"
31.15% Pervious = 13,144 sf 68.85% Impervious = 29,053 sf
Page 68 of 84
Page 69
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 8
Summary for Subcatchment 1: Subcat 1
Runoff = 2.12 cfs @ 11.96 hrs, Volume= 4,750 cf, Depth> 3.24"
Routed to Link AP1 : SENECA ST
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 25-yr Rainfall=3.84"
Area (sf) CN Description
733 73 Brush, Good, HSG D
16,839 98 Paved parking, HSG D
17,571 97 Weighted Average
733 4.17% Pervious Area
16,839 95.83% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 1: Subcat 1
Hydrograph
Runoff
2.12 cfs
2
Type II 24-hr
25-yr Rainfall=3.84"
Runoff Area=17,571 sf
Runoff Volume=4,750 cf
Flow (cfs)
Runoff Depth>3.24"
1
Tc=6.0 min
CN=97
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 69 of 84
Page 70
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 9
Summary for Subcatchment 2: Subcat 2
Runoff = 1.32 cfs @ 11.97 hrs, Volume= 2,586 cf, Depth> 1.91"
Routed to Pond 6P : INFIL. BED 5
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 25-yr Rainfall=3.84"
Area (sf) CN Description
10,593 73 Brush, Good, HSG D
2,424 98 Paved parking, HSG D
3,239 98 Unconnected pavement, HSG D
16,257 82 Weighted Average
10,593 65.16% Pervious Area
5,663 34.84% Impervious Area
3,239 57.20% Unconnected
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 2: Subcat 2
Hydrograph
Runoff
1.32 cfs
Type II 24-hr
25-yr Rainfall=3.84"
1
Runoff Area=16,257 sf
Runoff Volume=2,586 cf
Flow (cfs)
Runoff Depth>1.91"
Tc=6.0 min
CN=82
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 70 of 84
Page 71
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 10
Summary for Subcatchment 3: Subcat 3
Runoff = 0.08 cfs @ 11.96 hrs, Volume= 175 cf, Depth> 3.32"
Routed to Pond 5P : INFIL. BED
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 25-yr Rainfall=3.84"
Area (sf) CN Description
4 73 Brush, Good, HSG D
627 98 Paved parking, HSG D
630 98 Weighted Average
4 0.61% Pervious Area
627 99.39% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 3: Subcat 3
Hydrograph
0.085 Runoff
0.08
0.08 cfs
0.075 Type II 24-hr
0.07
0.065 25-yr Rainfall=3.84"
0.06
0.055
Runoff Area=630 sf
0.05 Runoff Volume=175 cf
Flow (cfs)
0.045
0.04
Runoff Depth>3.32"
0.035 Tc=6.0 min
0.03
0.025 CN=98
0.02
0.015
0.01
0.005
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 71 of 84
Page 72
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 11
Summary for Subcatchment 4: Subcat 4
Runoff = 0.22 cfs @ 11.96 hrs, Volume= 500 cf, Depth> 3.24"
Routed to Pond 1P : INFIL. BED
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 25-yr Rainfall=3.84"
Area (sf) CN Description
38 73 Brush, Good, HSG D
1,814 98 Paved parking, HSG D
1,852 97 Weighted Average
38 2.03% Pervious Area
1,814 97.97% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,
Subcatchment 4: Subcat 4
Hydrograph
Runoff
0.24 0.22 cfs
0.23
0.22
0.21
Type II 24-hr
0.2
0.19 25-yr Rainfall=3.84"
0.18
0.17
0.16
Runoff Area=1,852 sf
0.15
Runoff Volume=500 cf
Flow (cfs)
0.14
0.13
0.12 Runoff Depth>3.24"
0.11
0.1
0.09
Tc=6.0 min
0.08
0.07
CN=97
0.06
0.05
0.04
0.03
0.02
0.01
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 72 of 84
Page 73
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 12
Summary for Subcatchment 5: Subcat 5
[46] Hint: Tc=0 (Instant runoff peak depends on dt)
Runoff = 0.22 cfs @ 11.89 hrs, Volume= 366 cf, Depth> 1.76"
Routed to Pond 6P : INFIL. BED 5
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 25-yr Rainfall=3.84"
Area (sf) CN Description
1,773 73 Brush, Good, HSG D
721 98 Paved parking, HSG D
2,495 80 Weighted Average
1,773 71.08% Pervious Area
721 28.92% Impervious Area
Subcatchment 5: Subcat 5
Hydrograph
0.25
Runoff
0.24 0.22 cfs
0.23
0.22
0.21
Type II 24-hr
0.2
0.19 25-yr Rainfall=3.84"
0.18
0.17 Runoff Area=2,495 sf
0.16
0.15
Runoff Volume=366 cf
Flow (cfs)
0.14
0.13
0.12 Runoff Depth>1.76"
0.11
0.1
0.09
Tc=0.0 min
0.08
0.07
CN=80
0.06
0.05
0.04
0.03
0.02
0.01
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 73 of 84
Page 74
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 13
Summary for Subcatchment 6: Subcat 6
[46] Hint: Tc=0 (Instant runoff peak depends on dt)
Runoff = 0.48 cfs @ 11.89 hrs, Volume= 940 cf, Depth> 3.32"
Routed to Pond 4P : INFIL. BED SAND
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Type II 24-hr 25-yr Rainfall=3.84"
Area (sf) CN Description
3 73 Brush, Good, HSG D
3,363 98 Paved parking, HSG D
27 98 Unconnected pavement, HSG D
3,392 98 Weighted Average
3 0.09% Pervious Area
3,389 99.91% Impervious Area
27 0.79% Unconnected
Subcatchment 6: Subcat 6
Hydrograph
Runoff
0.5
0.48 cfs
0.45
Type II 24-hr
0.4
25-yr Rainfall=3.84"
0.35
Runoff Area=3,392 sf
Runoff Volume=940 cf
Flow (cfs)
0.3
0.25
Runoff Depth>3.32"
0.2
Tc=0.0 min
0.15
CN=98
0.1
0.05
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 74 of 84
Page 75
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 14
Summary for Pond 1P: INFIL. BED
[82] Warning: Early inflow requires earlier time span
Inflow Area = 2,482 sf, 98.33% Impervious, Inflow Depth > 2.60" for 25-yr event
Inflow = 0.22 cfs @ 11.96 hrs, Volume= 538 cf
Outflow = 0.00 cfs @ 10.05 hrs, Volume= 221 cf, Atten= 98%, Lag= 0.0 min
Discarded = 0.00 cfs @ 10.05 hrs, Volume= 221 cf
Primary = 0.00 cfs @ 5.00 hrs, Volume= 0 cf
Routed to Link AP2 : BASIN
Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Peak Elev= 646.82' @ 15.78 hrs Surf.Area= 697 sf Storage= 340 cf
Plug-Flow detention time= 176.2 min calculated for 220 cf (41% of inflow)
Center-of-Mass det. time= 73.0 min ( 814.8 - 741.8 )
Volume Invert Avail.Storage Storage Description
#1 645.60' 836 cf PEA GRAVEL (Prismatic)Listed below (Recalc)
2,091 cf Overall x 40.0% Voids
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
645.60 697 0 0
648.60 697 2,091 2,091
Device Routing Invert Outlet Devices
#1 Discarded 645.60' 0.300 in/hr Exfiltration over Surface area
#2 Primary 648.30' 3.8' long Broad-Crested Rectangular Weir
Head (feet) 0.01
Coef. (English) 2.60
Discarded OutFlow Max=0.00 cfs @ 10.05 hrs HW=645.63' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.00 cfs)
Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=645.60' (Free Discharge)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 75 of 84
Page 76
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 15
Pond 1P: INFIL. BED
Hydrograph
0.22 cfs Inflow
Outflow
Discarded
Inflow Area=2,482 sf Primary
0.24
0.22 Peak Elev=646.82'
0.2 Storage=340 cf
0.18
0.16
Flow (cfs)
0.14
0.12
0.1
0.08
0.06
0.00 cfs
0.04
0.00 cfs
0.02
0.00 cfs
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 76 of 84
Page 77
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 16
Summary for Pond 4P: INFIL. BED SAND
[82] Warning: Early inflow requires earlier time span
[92] Warning: Device #1 is above defined storage
[93] Warning: Storage range exceeded by 0.02'
[88] Warning: Qout>Qin may require smaller dt or Finer Routing
[85] Warning: Oscillations may require smaller dt or Finer Routing (severity=77)
Inflow Area = 3,392 sf, 99.91% Impervious, Inflow Depth > 3.32" for 25-yr event
Inflow = 0.48 cfs @ 11.89 hrs, Volume= 940 cf
Outflow = 0.52 cfs @ 11.89 hrs, Volume= 647 cf, Atten= 0%, Lag= 0.3 min
Discarded = 0.00 cfs @ 5.35 hrs, Volume= 121 cf
Primary = 0.52 cfs @ 11.89 hrs, Volume= 526 cf
Routed to Link AP2 : BASIN
Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Peak Elev= 648.14' @ 11.89 hrs Surf.Area= 244 sf Storage= 293 cf
Plug-Flow detention time= 109.7 min calculated for 645 cf (69% of inflow)
Center-of-Mass det. time= 42.9 min ( 770.3 - 727.4 )
Volume Invert Avail.Storage Storage Description
#1 644.12' 293 cf Sand/Fill (Prismatic)Listed below (Recalc)
976 cf Overall x 30.0% Voids
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
644.12 244 0 0
646.62 244 610 610
648.12 244 366 976
Device Routing Invert Outlet Devices
#1 Primary 648.12' 59.7' long Broad-Crested Rectangular Weir
Head (feet) 0.01
Coef. (English) 2.60
#2 Discarded 644.12' 0.400 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.00 cfs @ 5.35 hrs HW=644.16' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.00 cfs)
Primary OutFlow Max=0.31 cfs @ 11.89 hrs HW=648.14' (Free Discharge)
1=Broad-Crested Rectangular Weir (Weir Controls 0.31 cfs @ 0.33 fps)
Page 77 of 84
Page 78
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 17
Pond 4P: INFIL. BED SAND
Hydrograph
Inflow
Outflow
0.52 cfs Discarded
0.48 cfs
Inflow Area=3,392 sf Primary
0.55
0.52 cfs
Peak Elev=648.14'
0.5
0.45
Storage=293 cf
0.4
0.35
Flow (cfs)
0.3
0.25
0.2
0.15
0.1
0.00 cfs
0.05
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 78 of 84
Page 79
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 18
Summary for Pond 5P: INFIL. BED
[82] Warning: Early inflow requires earlier time span
[92] Warning: Device #2 is above defined storage
[93] Warning: Storage range exceeded by 0.01'
[85] Warning: Oscillations may require smaller dt or Finer Routing (severity=76)
Inflow Area = 630 sf, 99.39% Impervious, Inflow Depth > 3.32" for 25-yr event
Inflow = 0.08 cfs @ 11.96 hrs, Volume= 175 cf
Outflow = 0.02 cfs @ 12.16 hrs, Volume= 75 cf, Atten= 79%, Lag= 11.8 min
Discarded = 0.00 cfs @ 6.00 hrs, Volume= 37 cf
Primary = 0.02 cfs @ 12.16 hrs, Volume= 38 cf
Routed to Pond 1P : INFIL. BED
Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Peak Elev= 648.51' @ 12.15 hrs Surf.Area= 100 sf Storage= 100 cf
Plug-Flow detention time= 162.9 min calculated for 75 cf (43% of inflow)
Center-of-Mass det. time= 61.0 min ( 792.7 - 731.7 )
Volume Invert Avail.Storage Storage Description
#1 646.00' 100 cf PEA GRAVEL (Prismatic)Listed below (Recalc)
250 cf Overall x 40.0% Voids
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
646.00 100 0 0
648.50 100 250 250
Device Routing Invert Outlet Devices
#1 Discarded 646.00' 0.300 in/hr Exfiltration over Surface area
#2 Primary 648.50' 5.0' long Broad-Crested Rectangular Weir
Head (feet) 0.01
Coef. (English) 2.60
Discarded OutFlow Max=0.00 cfs @ 6.00 hrs HW=646.03' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.00 cfs)
Primary OutFlow Max=0.01 cfs @ 12.16 hrs HW=648.51' (Free Discharge)
2=Broad-Crested Rectangular Weir (Weir Controls 0.01 cfs @ 0.21 fps)
Page 79 of 84
Page 80
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 19
Pond 5P: INFIL. BED
Hydrograph
0.08 cfs Inflow
Outflow
Discarded
0.085 Inflow Area=630 sf Primary
0.08
0.075 Peak Elev=648.51'
0.07
0.065
Storage=100 cf
0.06
0.055
0.05
Flow (cfs)
0.045
0.04
0.035
0.03 0.02 cfs
0.025
0.02 0.02 cfs
0.015
0.01 0.00 cfs
0.005
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 80 of 84
Page 81
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 20
Summary for Pond 6P: INFIL. BED 5
Inflow Area = 18,751 sf, 34.05% Impervious, Inflow Depth > 1.89" for 25-yr event
Inflow = 1.44 cfs @ 11.96 hrs, Volume= 2,953 cf
Outflow = 0.01 cfs @ 10.65 hrs, Volume= 431 cf, Atten= 99%, Lag= 0.0 min
Discarded = 0.01 cfs @ 10.65 hrs, Volume= 431 cf
Primary = 0.00 cfs @ 5.00 hrs, Volume= 0 cf
Routed to Link AP2 : BASIN
Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Peak Elev= 645.64' @ 20.00 hrs Surf.Area= 1,686 sf Storage= 2,521 cf
Plug-Flow detention time= 220.3 min calculated for 431 cf (15% of inflow)
Center-of-Mass det. time= 109.9 min ( 893.5 - 783.6 )
Volume Invert Avail.Storage Storage Description
#1 641.90' 3,844 cf PEA GRAVEL (Prismatic)Listed below (Recalc)
9,610 cf Overall x 40.0% Voids
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
641.90 1,686 0 0
647.60 1,686 9,610 9,610
Device Routing Invert Outlet Devices
#1 Discarded 641.90' 0.300 in/hr Exfiltration over Surface area
#2 Primary 645.90' 6.0' long Broad-Crested Rectangular Weir
Head (feet) 0.01
Coef. (English) 2.60
Discarded OutFlow Max=0.01 cfs @ 10.65 hrs HW=641.96' (Free Discharge)
1=Exfiltration (Exfiltration Controls 0.01 cfs)
Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=641.90' (Free Discharge)
2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 81 of 84
Page 82
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 21
Pond 6P: INFIL. BED 5
Hydrograph
1.44 cfs Inflow
Outflow
Discarded
Inflow Area=18,751 sf Primary
Peak Elev=645.64'
Storage=2,521 cf
1
Flow (cfs)
0.01 cfs
0.01 cfs
0.00 cfs
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 82 of 84
Page 83
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 22
Summary for Link AP1: SENECA ST
Inflow Area = 17,571 sf, 95.83% Impervious, Inflow Depth > 3.24" for 25-yr event
Inflow = 2.12 cfs @ 11.96 hrs, Volume= 4,750 cf
Primary = 2.12 cfs @ 11.96 hrs, Volume= 4,750 cf, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Link AP1: SENECA ST
Hydrograph
Inflow
2.12 cfs Primary
2.12 cfs
Inflow Area=17,571 sf
2
Flow (cfs)
1
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 83 of 84
Page 84
Rustys_Post-Construction - Copy Type II 24-hr 25-yr Rainfall=3.84"
Prepared by Waves AE Printed 7/29/2026
HydroCAD® 10.20-7a s/n 13900 © 2025 HydroCAD Software Solutions LLC Page 23
Summary for Link AP2: BASIN
Inflow Area = 24,626 sf, 49.60% Impervious, Inflow Depth > 0.26" for 25-yr event
Inflow = 0.52 cfs @ 11.89 hrs, Volume= 526 cf
Primary = 0.52 cfs @ 11.89 hrs, Volume= 526 cf, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs
Link AP2: BASIN
Hydrograph
Inflow
0.52 cfs Primary
0.55 0.52 cfs
Inflow Area=24,626 sf
0.5
0.45
0.4
0.35
Flow (cfs)
0.3
0.25
0.2
0.15
0.1
0.05
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Page 84 of 84