Text · page 7 of 15
Read the whole document on one page (all 15 pages, each with its own heading)
Town Board Meeting #14 July 15, 2026
RESOLUTION 2026 #260 Lake Erie Beach Volunteer Fire Company, Inc. Elected Membership
Councilman DiMartino moved and Councilman Reitz seconded,
WHEREAS, the Lake Erie Beach Volunteer Fire Company, Inc. has accepted applications for
new candidates for membership; and
WHEREAS, each candidate was interviewed thoroughly and found to meet or exceed the
qualifications; and
WHEREAS, the following candidate was elected into membership of the Lake Erie Beach
Volunteer Fire Company, Inc. during the July 2, 2026 General Membership Meeting;
NOW, THEREFORE, BE IT RESOLVED, based on the above, the Evans Town Board hereby
approves the following member elected into membership to the Lake Erie Beach Volunteer Fire
Company, Inc.;
Mariah Emhof
VOTE RESULT: ADOPTED BY ROLL CALL
Councilman Wilson Aye
Councilman Reitz Aye
Councilman Paluch Aye
Councilman DiMartino Aye
Supervisor Ashton Aye
RESOLUTION 2026 #261 NYS Department of Environmental Conservation’s Water Quality
Improvements Program – Sturgeon Point Marina Sanitary Sewer Extension Project Approval
Councilman Reitz moved and Councilman DiMartino seconded,
WHEREAS, the Town Board desires to apply for financial assistance from the NYS Department
of Environmental Conservation Water Quality Improvements Program to extend sanitary sewer
infrastructure along Sturgeon Point Road to its terminus at Sturgeon Point Marina; and
WHEREAS, Lu Engineers and Fisher Associates ("the consultants") conducted a hydraulic study
with preliminary design as part of the Sturgeon Point Marina Master Plan ; and
WHEREAS, the consultants have also provided a total project cost estimate of $3,291,836; and
WHEREAS, the Town Board commits to providing the required local matching funds to ensure
the timely implementation of the proposed project.
NOW, THEREFORE, BE IT RESOLVED, that Ray Ashton, as Supervisor of the Town of Evans,
is hereby authorized and directed to accept funds from the NYS Department of Environmental
Conservation in an amount not to exceed $2,468,877 for the Sturgeon Point Marina Sanitary
Sewer Extension; and
176