Southtowns Record

PBA09.10.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Sep 10, 2026, 6:00 p.m.
Posted by publisher
Sep 4, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Zoning and land use, Roads and traffic, Budget and taxes, Public safety, Parks and recreation

Original document

Same meeting

Text · page 11 of 84

DEMOLITION NOTES:  EROSION CONTROL PLAN:

  1.  CONTRACTOR SHALL VERIFY ALL EXISTING FIELD  NOTE: THE FOLLOWING EROSION CONTROL PROCEDURES
  CONDITIONS PRIOR TO COMMENCING DEMOLITION  SHALL BE ADHERED TO BY THE CONTRACTOR. THIS PROJECT
OH
  W  ACTIVITIES. NOTIFY THE ENGINEER IMMEDIATELY OF ANY  DISTURBS LESS THAN ONE (1) ACRE AND IS NOT SUBJECT TO
  DISCREPANCIES BETWEEN FIELD CONDITIONS AND THE  NYSDEC SPDES GENERAL PERMIT COVERAGE OR SWPPP
  OH
  W

  2.
  PLANS.
  DEMOLITION SHALL BE LIMITED TO ONLY THOSE ITEMS
  REQUIREMENTS.  ARCHITECTURE & ENGINEERING
  SPECIFICALLY IDENTIFIED ON THE PLANS. EXISTING  1. ALL STUMPS AND BRUSH MAY NOT BE BURIED IN THE TOWN
  OH
  W
  IMPROVEMENTS NOT DESIGNATED FOR REMOVAL SHALL  AND TOPSOIL MAY NOT BE REMOVED FROM THE WORK
  255 ROUNDS AVE, BUFFALO NY 14225
  REMAIN AND BE PROTECTED THROUGHOUT  WITHOUT A PERMIT.
  OH
  W
  CONSTRUCTION.  2. INSTALL SILT SOCK ALONG THE LIMITS OF DISTURBANCE AS
  OH
  W
  3.  CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY
  NOTIFICATION SERVICE AT LEAST 72 HOURS PRIOR TO
  SHOWN ON THIS PLAN. REPLACE OR REPAIR WHEREVER
  CLOGGED, DAMAGED, OR INOPERABLE.
  PROJECT INFORMATION
  EXCAVATION OR DEMOLITION. FIELD VERIFY THE  3. THE CONTRACTOR SHALL MAINTAIN ALL TEMPORARY
  OH
  W  LOCATION OF ALL UNDERGROUND UTILITIES BEFORE  SEDIMENT CONTROLS UNTIL DISTURBED AREAS ARE FULLY  Project Name
  BEGINNING WORK.  STABILIZED.  4350 SENECA STREET
  OH
  W  4.  CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND  4. DIRT OR DEBRIS TRACKED ONTO PUBLIC ROADS SHALL BE  BUILDING ADDITION
  FACILITIES TO REMAIN. ANY DAMAGE RESULTING FROM  REMOVED AND ROAD SURFACES CLEANED DAILY.
  OH
  W
  CONSTRUCTION OPERATIONS SHALL BE REPAIRED OR  5. THE CONTRACTOR SHALL CONTROL DUST THROUGHOUT  Project Address
  REPLACED BY THE CONTRACTOR AT NO ADDITIONAL  CONSTRUCTION. USE OF PETROLEUM-BASED PRODUCTS  4350 SENECA ST.
  OH
  W
  COST TO THE OWNER.  FOR DUST SUPPRESSION IS PROHIBITED.  WEST SENECA, NY 14224
  5.  REMOVE AND LEGALLY DISPOSE OF ALL DEMOLISHED  6. ALL DISTURBED AREAS SHALL BE STABILIZED (SEEDED,
  OH
  MATERIALS OFF-SITE UNLESS OTHERWISE DIRECTED BY THE  MULCHED, OR OTHERWISE PROTECTED) WITHIN 14 DAYS OF  Client Name
  OWNER.  CEASED DISTURBANCE.
  HAVENS HOLDING GROUP
  W

  6.  SAWCUT EXISTING PAVEMENT, CONCRETE SLABS,  7. THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF
  OH
  W  SIDEWALKS, AND CURBS AT THE LIMITS OF DEMOLITION TO  DOWNSTREAM STORM SEWERS, DITCHES, AND CULVERTS.
  PROVIDE NEAT, STRAIGHT EDGES FOR PROPOSED  SILT BUILDUP RESULTING FROM THIS PROJECT SHALL BE
  OH  CONSTRUCTION.  REMOVED AT NO ADDITIONAL EXPENSE TO THE OWNER OR  Waves Project Number
  24001.00
  W

  7.  BACKFILL EXCAVATIONS RESULTING FROM DEMOLITION  MUNICIPALITY.
  OH
  W
  WITH APPROVED STRUCTURAL FILL AND COMPACT IN  8. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE
  ACCORDANCE WITH THE PROJECT SPECIFICATIONS.  MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED, AS
  OH
  EXISTING GRADING DISTURBED DURING DEMOLITION  DIRECTED BY THE ENGINEER.
  W
  SHALL BE RESTORED OR REGRADED AS SHOWN ON THE  9. STOCKPILE AND CONCRETE WASHOUT LOCATIONS SHALL
  PROPOSED GRADING PLAN, C-102.  BE ESTABLISHED AS SHOWN ON THIS PLAN, INCLUDING SILT
  OH
  W
  8.  CONTRACTOR SHALL MAINTAIN SAFE ACCESS TO  SOCK AROUND STOCKPILE BASES. STOCKPILES SHALL BE
  OCCUPIED PORTIONS OF THE SITE THROUGHOUT  TEMPORARILY STABILIZED AS SOON AS PRACTICABLE.
  OH
  W  DEMOLITION OPERATIONS UNLESS OTHERWISE APPROVED  10. TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON SITE FOR
  BY THE OWNER.  REUSE AS DIRECTED BY THE OWNER. TOPSOIL MAY NOT BE
  OH
  W
  9.  STOCKPILE MATERIALS DESIGNATED BY THE OWNER FOR  REMOVED FROM SITE WITHOUT A PERMIT.  PROJECT ISSUE & REVISION SCHEDULE
  SALVAGE IN A LOCATION APPROVED BY THE OWNER.  11. INLET PROTECTION SHALL BE INSTALLED AT ALL STORM
  OH  ST
  ALL REMAINING DEMOLISHED MATERIALS SHALL BECOME  DRAINAGE STRUCTURES PRIOR TO THE STRUCTURE
  W
  THE RESPONSIBILITY OF THE CONTRACTOR.  BECOMING OPERATIONAL, REGARDLESS OF WHETHER
  10.  PROTECT ALL TREES, LANDSCAPING, STRUCTURES, AND  SHOWN ON THIS PLAN. THE CONTRACTOR SHALL FIELD
  ST
  OH
  W  SITE FEATURES DESIGNATED TO REMAIN FROM DAMAGE  VERIFY THE LOCATION OF ALL STORM STRUCTURES WITHIN

  W
  OH
  DURING DEMOLITION OPERATIONS.  THE LIMITS OF DISTURBANCE PRIOR TO COMMENCING
  ST  11.  EXISTING UTILITIES ENCOUNTERED THAT ARE TO REMAIN IN  WORK AND NOTIFY THE ENGINEER OF ANY
  OH
  W  SERVICE SHALL BE ADEQUATELY SUPPORTED AND  DISCREPANCIES.
  ST
  PROTECTED THROUGHOUT CONSTRUCTION.
  12.  ANY UTILITIES DISCOVERED DURING DEMOLITION THAT  SEQUENCE OF MAJOR ACTIVITIES:

  OHW
  OH
  W
  CONFLICT WITH PROPOSED IMPROVEMENTS AND ARE
  NOT SHOWN ON THE PLANS SHALL BE BROUGHT TO THE  NOTE: A STABILIZED CONSTRUCTION ENTRANCE IS NOT

  CK
  ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING.  REQUIRED, AS THE EXISTING PARKING LOT WILL SERVE THIS

  BA
  ST

  ST
  OH
  W
  13.  CONTRACTOR SHALL COORDINATE DEMOLITION  FUNCTION.

  07/27/26 PERMIT DRAWING
  SET
  ACTIVITIES WITH THE OWNER TO MINIMIZE DISRUPTION TO

  W
  OH

  RD
  ST
  OH  ONGOING SITE OPERATIONS.

  YA
  W
  1. INSTALL EROSION CONTROL MEASURES.
  ST

  RELOCATION OF EXISTING ELEC. POLE

  AR
  2. ESTABLISH STOCKPILE AND CONCRETE WASHOUT

  ' RE

  Description
  OH
  W
  LOCATIONS AS SHOWN ON THIS PLAN.

  OHW

  25
  3. COMMENCE SITE EXCAVATION.
  4. COMMENCE CONSTRUCTION.
  OH
  W  5. ESTABLISHMENT (FINAL GRADING, SEEDING, PLANTING,
  SSK  SSK  AND STABILIZATION).

  SSK
  LOD

  W
  OH
  RESTORATION NOTES:
  LOD

  LO
  D
  LIMIT OF DISTURBANCE  1. ADJACENT AREAS DISTURBED OR DAMAGED DURING
  RELOCATION/ DEMOLITION OF  EXISTING ELEC. POLE  AREA = 3383.29 ft²  CONSTRUCTION SHALL BE RESTORED IN KIND TO THE

  SSK
  EXISTING SHED, TBD BY OWNER  TO BE RELOCATED  SATISFACTION OF THE OWNER.
  PROTECT IN PLACE EXISTING  2. WHEN RESTORING LAWN AREAS ADJACENT TO NEW
  SSK

  STOCKPILE AREA  PAVILION STRUCTURE  CONSTRUCTION, ON-SITE MATERIAL MAY BE USED TO
  BACKFILL WITHIN SIX INCHES OF FINISHED SURFACE,

  Date
  THOROUGHLY COMPACTED AND FREE OF GRASS CLUMPS,

  LOD
  REMOVE EX. CONC. RETAINING WALL IN
  TREE ROOTS, ASPHALT PIECES, OTHER EXTRANEOUS
  LOD  FULL. REF. C-102 FOR NEW RETAINING
  MATERIAL, AND STONES LARGER THAN 1 INCH.
  WALL LOCATION AND ELEVATIONS
  3. ALL DISTURBED UNSURFACED AREAS SHALL RECEIVE FOUR
  5' SIDE YARD  INCHES OF TOPSOIL, SEED, AND MULCH, AND SHALL BE

  LOD

  1
  SETBACK  WATERED UNTIL A HEALTHY STAND OF GRASS IS
  ESTABLISHED. DISTURBED ASPHALT, CONCRETE, OR PAVING

  #
  STONE AREAS SHALL BE REPLACED IN KIND: SAW CUT FULL
  DEPTH ALONG STRAIGHT, TRUE LINES; PAVING STONES  PROFESSIONAL STAMPS
  REPLACED IN WHOLE UNITS MATCHING EXISTING SIZE,

  LO
  D
  SHAPE, AND COLOR; ASPHALT COMPACTED TO A
  CHILLER ON CONC. PAD TO  SMOOTH FINISH FLUSH WITH ADJACENT SURFACES TO
  BE RELOCATED, REF. C-101  REMAIN.
  FOR NEW LOCATION

  LOD
  SILT SOCK, TYP.  INSPECTION AND MAINTENANCE PROCEDURES:

  NOTE: THE CONTRACTOR SHALL ASSIGN AN INDIVIDUAL
  RESPONSIBLE FOR INSPECTION AND MAINTENANCE OF
  LOD

  LOD
  TEMPORARY EROSION AND SEDIMENTATION CONTROL
  SSK  MEASURES, INCLUDING BUT NOT LIMITED TO:
  LOD
  SILT SOCK, TYP.  SS
  K
  LO
  D  1. INSPECT ALL EROSION CONTROL MEASURES AT LEAST
  ONCE EVERY SEVEN CALENDAR DAYS, AND FOLLOWING
  SNOWMELT/FREEZE-THAW EVENTS.
  2. MAINTAIN ALL MEASURES IN GOOD WORKING ORDER AS
  DEEMED NECESSARY BY THE TOWN AND ENGINEER;

  LOD
  COMPLETE REPAIRS WITHIN 24 HOURS OF BEING REPORTED.
  SILT SOCK, TYP.  CONC. WASH OUT  3. CHECK AND REPAIR SILT SOCK AND EROSION CONTROL
  DEVICES AS NECESSARY.
  4. INSPECT TEMPORARY AND PERMANENT
  LOD

  SEEDING/PLANTING FOR BARE SPOTS, WASHOUTS, AND
  HEALTHY GROWTH; REPAIR AS NECESSARY.
  5. MONITOR NEIGHBORING ROADWAYS AND SWEEP
  TRACKED MUD, DIRT, OR ROCK AS NECESSARY.
  6. VERIFY THAT INLET PROTECTION IS IN PLACE AT ALL STORM
  STRUCTURES ENCOUNTERED IN THE FIELD, INCLUDING ANY
  NOT SHOWN ON THIS PLAN, AND REPORT ANY
  UNPROTECTED OR PREVIOUSLY UNIDENTIFIED STRUCTURES
  TO THE ENGINEER IMMEDIATELY.

  PLAN NOTES:

  1. SHOULD CONSTRUCTION TAKE PLACE PRIOR TO ISSUANCE
  OF 100% IFC DRAWINGS, WAVES ASSUMES NO
  INLET PROTECTION  RESPONSIBILITY, LIABILITY, QUANTITY OR RELATED.
  2. SURVEY PROVIDED BY LABELLA. WAVES ASSUMES NO
  NOT FOR CONSTRUCTION
  RESPONSIBILITY FOR ACCURACY AND CONTENT.
  ST
  3. UPDATED PLAN TO BE MAINTAINED BY FIELD
  CONSTRUCTION TEAM, AND SHARED WITH WAVES AE ON
  A WEEKLY BASIS.
  ST

  ST

  LEGEND:
  ST
  ST

  EXISTING MAJOR CONTOURS

  ST
  EXISTING MINOR CONTOURS

  PROPERTY SETBACK MIN.
  SHEET INFORMATION
  Issued  Scale for 22x34 Sheets
  ST

  ST

  PROPERTY LINE
  07/28/2026 1" = 20'
  LOD  LIMIT OF DISTURBANCE  Project Status
  SSK
  SSK
  SILT SOCK  PERMIT - SITE PLAN
  ST

  INLET PROTECTION
  Drawing Title
  DEMO AND ESC PLAN
  DEMOLITION LINE
  Drawn By  Checked By
  ST

  DEMOLITION  ANW  JLH
  20  0  20  40  DEMOLITION OF EXISTING TREES
  Drawing Number
  C-002
  ST

  SCALE IN FEET

  Page 11 of 84