10-28-26 Planning Board Work Session - Site Plan and Rezone (full text)
Page 1
TOWN OF EVANS
PLANNING BOARD
WORK SESSION AGENDA
Wednesday, October 28, 2026, at 6:00 P.M.
Work Session will take place in the
EVANS COURTROOM
8787 Erie Rd., Angola, NY
and virtually by ZOOM
Visit the Town of Evans website at townofevans.org for instructions on how to join via web or phone.
1. Site Plan – proposal to review and confirm existing use of a storage/marshalling yard, housing
materials and equipment on a 13.5± acre portion of a 29.8± acre parcel located on Eden Evans
Center Road, Angola, NY, 14006 (SBL# 222.00-4-13). Property owner: Union Concrete &
Construction Corporation. Petitioner: National Grid.
2. Rezone Application – proposal to rezone a 6.9-acre electrical utility substation from Rural
Agriculture (RA) to Light Industrial (LI). Located at 8175 Delamater Rd., Angola, NY 14006 (SBL#
221.00-4-38). Property Owner: Niagara Mohawk Power Corporation d/b/a National Grid.
3. Any other business that may presently be before the Planning Board.
Further information regarding agenda items is available from the
Planning Office, Email: [email protected] / Phone: 716-549-0945 and on the
Town Website: www.townofevansny.gov
Page 2
1. Site Plan - 1864 Eden Evans Center Rd.
Petitioner: National Grid
Page 3
Ari M. Goldberg
Counsel
August 14, 2026
VIA ELECTRONIC MAIL
VIA HAND DELIVERY
Town of Evans
Zoning Board of Appeals
Planning Board
8787 Erie Road
Angola, New York 14006
Re: Niagara Mohawk Power Corporation d/b/a National Grid –
1864 Eden Evans Center Road
Site Plan and Public Utility Use Variance Application
Dear Members of the Zoning Board of Appeals and Planning Board:
Barclay Damon LLP represents Niagara Mohawk Power Corporation d/b/a National Grid
(“Applicant” or “National Grid”), contract vendee and lessee of 1864 Eden Evans Center Road,
Tax ID: 222.00-4-13, (“Property”) in the Town of Evans (the “Town”). The approximately 30-
acre Property is dual zoned General Business (GB) and Rural Agricultural (RA).
Applicant originally obtained approval to utilize a portion of the southern part of the parcel,
zoned GB, as a marshalling yard for its Gardenville-Dunkirk 141/142 (“GD 141/142”) Northern
Section Rebuild Project (Case 18-T-0561), since it was approved by the New York State Public
Service Commission (PSC), by Order Approving Environmental Management and Construction
Plan Part A Subject to Conditions, effective March 17, 2022, as part of an Article VII transmission
project. The Property is improved with two fenced-in gravel areas. With the GD 141/142 project
having concluded, National Grid now proposes to affirm the use of the Property as a marshalling
yard to store equipment needed for the construction, repairs, rebuilds, or expansions of
transmission lines and substations within the area.
National Grid provides an essential service to the Community—your electricity. To
enhance grid resiliency, follow state climate targets, and meet growing demand, National Grid
constantly improves its properties, stations, and infrastructure holdings throughout its service
territory. In Western New York, National Grid’s service territory includes Niagara, Erie,
Chautauqua, and Cattaraugus County.
The Property is immediately adjacent to the New York State Thruway, making it a perfect
candidate for continued use as a marshalling yard to support National Grid’s continued provision
of essential services. However, under the GB zoning, a marshalling yard is not a permitted use.
The Avant Building - 200 Delaware Avenue Suite 1200 - Buffalo, New York 14202 barclaydamon.com
[email protected] Direct: (716) 858-3878 Fax: (716) 566-4040
Page 4
National Grid Site Plan and Public Utility Use Variance Application
August 14, 2026
Page 2
Applicant therefore seeks a use variance from the Town Zoning Board of Appeals (“ZBA”) to
affirm use of the Property as a marshalling yard. Additionally, Applicant seeks a Site Plan
determination from the Town Planning Board. Applicant also anticipates that the Planning Board
will serve as lead agency pursuant to the State Environmental Quality Review Act (“SEQRA”).
Enclosed, please find the following exhibits:
1. Town of Evans Building Permit/Planning Board Site Plan Application Form
2. Town of Evans Zoning Board of Appeals Application Form
3. Site Plans
a. C-100 Cover Sheet
b. C-200 Site Plan
c. L-100 Landscape Plan
d. L-200 Landscape Details
4. Full Environmental Assessment Form
5. National Grid Improvement Projects – 15 Mile Radius Map
6. Office of Parks, Recreation and Historic Preservation Letter of No Impact
7. New York State PSC Order Approving Environmental Management and
Construction Plan Part A Subject to Conditions, dated March 17, 2022
Planning Board Site Plan Review
Under the Zoning Regulations for the Town of Evans, Chapter 200, Section 42, Applicant
respectfully requests that the Planning Board conduct its required site plan review of the Project
concurrently with the ZBA’s review of the use variance. As detailed below, it is anticipated that
the Planning Board will act as lead agency in a coordinated environmental review and initiate the
required county referral.
State Environmental Quality Review Act & General Municipal Law
Pursuant to Article 8 of the New York Environmental Conservation Law and 6 NYCRR
Part 617 (SEQRA), state and local governments are required to consider environmental impacts of
proposed actions during discretionary decision-making. National Grid anticipates that the Planning
Board will serve as the Lead Agency in a coordinated review of this action. Enclosed as Exhibit 4
is a full environmental assessment form (FEAF), which comprehensively evaluates the potential
environmental impacts of the proposed action. The scope of the proposed action has been defined
broadly to encompass all associated site work and activities; however, there is no disturbance
proposed. Additionally, a SEQRA determination must be rendered prior to any action by the ZBA.
Pursuant to General Municipal Law (“GML”) § 239-m, please refer a full statement of the
proposed action to the Erie County Department of Environment and Planning. Please also note
that GML § 239-m referral must be complete before any decision by the Planning Board and ZBA.
Page 5
National Grid Site Plan and Public Utility Use Variance Application
August 14, 2026
Page 3
Application of the Public Utility Variance Standard and Zoning Board Review
New York State Case Law
Under New York State Town Law § 267-b, a four-part test is generally applied to use
variance applications for most commercial uses. However, as this ZBA may be aware, this test has
been adapted for public utility uses that meet a public need, such as electrical generation facilities,
allowing the expansion of these essential services. The New York State Court of Appeals has
recognized that certain uses are so fundamental and location specific that they cannot be subject
to local zoning restrictions. This recognition established the Public Utility Variance Standard
(“PUV Standard”) for public utility uses.
The PUV Standard requires an applicant providing an “essential service,” to demonstrate:
(1) the relief is “a public necessity in that it is required to render safe and adequate service,”
and
(2) there are “compelling reasons, economic or otherwise,” that make it more feasible to
seek that variance than to seek alternative locations.
Consolidated Edison Co. of New York v Hoffman, 43 NY2d 598, 611 (1978) (concerning nuclear
power). Notably, the Court also emphasized that “where the intrusion or burden on the community
is minimal, the showing required by the utility should be correspondingly reduced.” Id.
As public need required more essential services, the Court of Appeals confirmed that the
PUV standard “applies to entirely new siting of facilities.” Cellular Tel. Co. v. Rosenberg, 82
NY2d 364, 372 (1993) (concerning telecommunications tower). It is also well established that the
PUV standard applies to private companies who help meet a public need. See id. at 371; see also
Site Acquisitions, Inc. v Town of New Scotland, 2 AD3d 1135, 1136-1137 (2003) (“Since Site,
Cingular and Independent are wireless phone service providers they are each treated as a public
utility for zoning purposes and, thus, the general principles governing variances sought by private
individuals or entities do not govern their application.”).
Undeniably, “electricity is an essential service.” Patricia E. Salkin and Robert Burgdorf,
Siting Wind Farms in New York: Applicability of the Relaxed Public Utility Standard, New York
Zoning Law and Practice Report vol. 7, No. 1. National Grid provides an essential service in the
form of electricity; therefore, the marshalling yard, which is part of the provision of public utility,
electric service and National Grid’s variance is subject to review under the PUV Standard.
Property Site Selection
“There is no legal requirement that [an applicant] analyze each and every possible parcel
of land before obtaining a variance; such a requirement would be unworkable.” Matter of
Freepoint Solar LLC v Town of Athens Zoning Bd. of Appeals, 234 AD3d 127, 134 (3d Dept 2024),
quoting Horvath Communications, Inc. v Town of Lockport Zoning Bd. of Appeals, 2018 NY Slip
Page 6
National Grid Site Plan and Public Utility Use Variance Application
August 14, 2026
Page 4
Op 33830[U] at *5 (Niagara County Supreme 2018). The Property was carefully selected based
on its proximity to existing National Grid infrastructure, including major electric transmission lines
and electrical substations, as well as consideration of site topography, site shape/size, slopes,
vegetation, wetlands, forested areas, proximity to threatened or endangered species, adjacent uses,
and site history—including history as a marshalling yard aiding in provision of National Grid’s
essential service.
Proximity to electrical infrastructure is paramount. National Grid is required to provide
safe and reliable electric service in New York. This mandate spurred National Grid to originally
use the Property as a marshalling yard as part of its GD 141/142 project. See Exhibit 7. Prior
approval by the PSC in the Article VII process indicates this location is strategic and beneficial to
National Grid’s essential mission.
Having a permanent marshalling yard allows National Grid to adequately service many
Western New York lines and upgrade aging infrastructure. In the coming years, staging at this
marshalling yard will allow National Grid to commence needed upgrades on at least 33 projects
within a 15-mile radius of the Property. See Exhibit 5. Given the location adjacent to the thruway
on and off ramps, National can use the marshalling yard for more than just the infrastructure and
projects identified within the 15-mile radius.
The Property under the PUV Standard
For entitlement to a use variance under the PUV standard, an applicant must demonstrate
that the facility provides an essential service, and the variance relief permitting the essential service
is required in order to provide safe and adequate service. Further, the applicant must show that
there are compelling reasons, economic or otherwise, that make it more feasible to seek the
variance than to use alternative locations. Notably, when the community intrusion is minimal, the
burden by the applicant should be correspondingly reduced.
Applying the PUV Standard, the electricity that the marshalling yard helps become a reality
is an essential service. However, the Zoning Law of the Town (“Zoning Law”) prohibits the
essential service at the Property. Therefore, the relief of the use variance is:
(1) a “public necessity” because absent the use variance, the cannot “render safe and
adequate [electrical] service” as it is prohibited under the Zoning Law at the
Property. Absent the ability to manage its dynamic flow of project materials from
a reliable and strategic location, National Grid will not have the ability to
consistently, safely, and conveniently upgrade or maintain its facilities; and
(2) there are “compelling reasons” that make it more feasible to seek this use variance
than to seek alternate locations. Such compelling reasons include:
a. The Marshalling Yard is necessary. National Grid serves the majority of
Western New York. To serve this large geographic region, National Grid
requires strategically placed marshaling yards that house necessary electrical
Page 7
National Grid Site Plan and Public Utility Use Variance Application
August 14, 2026
Page 5
infrastructure and replacement equipment. The marshalling yard was first
constructed upon approval by the PSC, who regulates all electric service
providers in the State. Under the Public Service Law, the PSC approved the
Property to serve as a marshalling yard to support National Grid’s GD 141/142
project. See Exhibit 7. Prior approval by the PSC in the Article VII process
indicates this location is strategic and beneficial to the logistics of completing
National Grid’s essential mission. Having a permanent marshalling yard in the
Town allows National Grid to adequately service many Western New York
lines and upgrade aging infrastructure. The Property is ideally situated for just
that due to its proximity to over 33 pending National Grid improvement
projects. See Exhibit 5. Given the location adjacent to the thruway on and off
ramps, National can use the marshalling yard for more than just the
infrastructure and projects identified within the 15-mile radius. Improved
infrastructure supports orderly development, health and safety, while also
facilitating the adequate provision of essential electricity services in the Town
and larger region.
b. There are no existing viable alternatives. The Property is located next to
National Grid’s 3-phase distribution circuit. This allows National Grid to
quickly respond to any outages or repairs on this line. The Property is also
located near many other western NY lines and substations. As discussed above,
proximity to 33 pending projects means National Grid can stage and improve
electrical infrastructure across its western New York footprint. Further, the
Property is already cleared/disturbed with sufficient open land. The Property
was strategically selected given the Property’s topography, existing vegetation,
suitable open land and proximity to National Grid infrastructure. Finally, the
Property has historically been used as a marshalling yard and is situated in a
low-development area.
c. Community intrusion is minimal. “[W]here the intrusion or burden on the
community is minimal, the showing required by the [applicant] should be
correspondingly reduced.” Consolidated Edison Co. of New York v Hoffman,
43 NY2d 598, 611 (1978). The Property minimizes potential environmental
impacts as there is no contamination history at the project site, no unique
geological features, it is not located in a floodplain, and it will have no impact
on any archaeological or historic sites. Applicant’s minimal proposed land
disturbance on site includes the installation of vegetative screening. Grading
(except for the filling of a few potholes and ruts) and below grade disturbance
is not anticipated. While the existing yard is an impervious gravel area with
permanent fencing and gates, Applicant does expect that a few perimeter
controls may be needed as part of the site upgrades. Importantly, the
marshalling yard complies with all underlying setback requirements.
Page 8
National Grid Site Plan and Public Utility Use Variance Application
August 14, 2026
Page 6
As noted, the only additional site work outside of the discussed site upgrades
comes from Applicant’s proposed landscaping package. The proposed
vegetative maintenance areas will screen the marshalling yard from
neighboring properties. The landscaping includes 600 linear feet of new
plantings with 60 total deciduous and trees evergreen trees of various species,
with 38 shrubs of varying heights, all planted across three strategically selected,
25’ wide planting rows. See Exhibit 3, sheets L-100, L-200.
In sum, electricity provided by National Grid is an essential service. The marshalling yard,
if approved, will help National Grid render safe, adequate, and reliable electrical service to the
electric grid. The marshalling yard is a critical component in the provision of essential service.
Therefore, National Grid respectfully requests the ZBA grant the use variance, under the PUV
standard, and affirm use of the Property as a marshalling yard.
Conclusion
The marshalling yard is in the public interest as it allows National Grid to continue
servicing and enhancing the local power grid. We look forward to discussing this with the Planning
Board and ZBA at their next meetings. If any additional material is required, please let us know.
Thank you for your consideration.
Very truly yours,
Ari M. Goldberg
AMG:dpk
Exhibits
cc: TRC, project engineers
National Grid
Page 9
Exhibit 1 – Town of Evans Site Plan Review
Application Form
Page 10
Docusign Envelope ID: F4549145-8198-8D82-8187-EFF08223CEDC
&EFO&WBOT.BSTIBMMJOH:BSE
&EFO&WBOT$FOUFS3PBE &WBOT /:
3"BOE(#
/JBHBSB.PIBXL1PXFS$PSQECB/BUJPOBM(SJE
&SJF#MWE8FTU 4ZSBDVTF /:"UUO$ISJT)VHIFT DISJTUPQIFSIVHIFT!OBUJPOBMHSJEDPN
6OJPO$PODSFUF$POTUSVDUJPO$PSQ
.FZFS3PBE 8FTU4FOFDB /:
53$$PNQBOJFT*OD1SPKFDU&OHJOFFS1BU.BSUJO 1&
.BSHJOBM8BZ UI'MPPS 1PSUMBOE .& 1..BSUJO!USDDPNQBOJFTDPN
/BUJPOBM(SJEQMBOTUPVTFUIFFYJTUJOHNBSTIBMMJOHZBSEXJUINJOJNBMTJUFJNQSPWFNFOUT
5IFFYJTUJOHNBSTIBMMJOHZBSEXBTPSJHJOBMMZBQQSPWFEBTQBSUPG/:4%14.BUUFS5
*OEVTUSJBMVTFDPNNFSDJBMNBSTIBMMJOHZBSE
.BSTIBMMJOH:BSE
/P
:FT-PDBM6TF7BSJBODF
Page 11
Docusign Envelope ID: F4549145-8198-8D82-8187-EFF08223CEDC
Page 12
Docusign Envelope ID: F4549145-8198-8D82-8187-EFF08223CEDC
9
9
9
9
9
9
9
/"
/"
/"
/"
/"
9
9
Page 13
Docusign Envelope ID: F4549145-8198-8D82-8187-EFF08223CEDC
/"
/"
/"
/"
9
/"
9
*ODMVEFE
/PVUJMJUJFTBSFSFRVJSFEGPSUIF1SPKFDU5IFSFGPSF UIJTTFDUJPOJTOPUBQQMJDBCMF
/"
Page 14
Docusign Envelope ID: F4549145-8198-8D82-8187-EFF08223CEDC
(SBEJOH1MBOJTOPUSFRVJSFEGPSUIF1SPKFDUBTNJOPSTJUFNPEJGJDBUJPOTBSF
CFJOHQSPQPTFE5IFSFGPSF UIJTTFDUJPOJTOPUBQQMJDBCMF
/"
Page 15
Docusign Envelope ID: F4549145-8198-8D82-8187-EFF08223CEDC
%SBJOBHF1MBOJTOPUSFRVJSFEGPSUIF1SPKFDUBTNJOPSTJUFNPEJGJDBUJPOTBSF
CFJOHQSPQPTFE5IFSFGPSF UIJTTFDUJPOJTOPUBQQMJDBCMF
/"
Page 16
Docusign Envelope ID: F4549145-8198-8D82-8187-EFF08223CEDC
9
9
9
9
/"
&41MBOTBSFOPUSFRVJSFEGPSUIF1SPKFDUBTNJOPSTJUFNPEJGJDBUJPOTBSFCFJOHQSPQPTFE
5IFSFGPSF UIJTTFDUJPOJTOPUBQQMJDBCMF
Page 17
Docusign Envelope ID: F4549145-8198-8D82-8187-EFF08223CEDC
-JHIUJOH1MBOJTOPUSFRVJSFEGPSUIF1SPKFDUBTOPQFSNBOFOU
TJUFMJHIUJOHJTCFJOHQSPQPTFE5IFSFGPSF UIJTTFDUJPOJTOPU
BQQMJDBCMF
/"
/PCVJMEJOHTBSFQSPQPTFE5IFSFGPSF UIJTTFDUJPOJTOPU
BQQMJDBCMF
/"
/"
*ODMVEFE
*ODMVEFE
1SPKFDUJTOPUMPDBUFEXJUIJOB-8315IFSFGPSF UIJTTFDUJPOJTOPUBQQMJDBCMF
/"
James Zuccolotto, Authorized SignatoU\IRU
National Grid-/Hssee &RQWUDFW9HQGHH
____________ 1864 Eden Evans Center Road, Evans, NY 14057
8/14/2026
Page 18
Exhibit 2 – Town of Evans Zoning Board of
Appeals Application Form
Page 19
222.00-4-13 GB and RA 08/14/2026
Niagara Mohawk Power Corp. d/b/a National Grid c/o Barclay Damon LLP (716) 858-3878
The Avant Building, 200 Delaware Avenue Suite 1200, Buffalo, New York 14202
1864 Eden Evans Center Road
n/a n/a
n/a n/a
Applicant seeks a use variance to allow for a permanent marshalling yard on the southern half of the property, currently zoned General
Business (GB). The northernmost portion of the parcel is zoned Rural Agricultural (RA), and will remain undeveloped.
Page 20
Please see attached cover letter detailing how Applicant satisfies the Public Utility
Variance Standard.
No, as detailed in the attached cover letter Applicant cannot site this marshalling yard
elsewhere. Please see attached cover letter detailing how Applicant satisfies the
Public Utility Variance Standard.
Applicant was using this portion of Property for temporary storage of materials
related to National Grid's Gardenville-Dunkirk 141/142 Northern Section Rebuild
Project (Matter No. 18-T-0561). Applicant now seeks this use variance to allow for a
permanent marshalling yard. Please see attached cover letter for more information.
Page 21
Exhibit 3 – Site Plan
Page 22
L-200 L-100 C-200 C-100
DRAWING NUMBER
PERMITTING ISSUE FOR
4 3 2 1
SHEET NUMBER
SITE PLAN
COVER SHEET
LANDSCAPE PLAN
LANDSCAPE DETAILS TITLE
NATIONAL GRID
EDEN EVANS CENTER ROAD
1864 EDEN EVANS CENTER ROAD
SITE PLAN APPLICATION DRAWINGS
TOWN OF EVANS, ERIE COUNTY, NEW YORK NIAGARA MOHAWK POWER CORPORATION D/B/A
PREPARED BY
EDEN EVANS CENTER ROAD ORIGINAL 07/23/26
DES.
TRC APPROVED
ISSUE DATE
FILE
DR.
TRC APPROVED
1864 EDEN EVANS CENTER ROAD INDEX
X.X-XX-M
TOWN OF EVANS, ERIE COUNTY, NEW YORK DRAWING C-100
CK.
PMM APPROVED NUMBER
07/26 ISSUED FOR PERMITTING TRC PMM PMM
SHEET
DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. ACCOUNT NUMBER COVER SHEET 1
APPROVED NUMBER
Page 23
X
07/23/26 C-200
N X 2
© 2026 Microsoft Corporation © Maxar ©CNES (2026) Distribution Airbus DS © Mapbox
X
N ORIGINAL
DRAWING SHEET
FILE
EVANS MARSHALLING YARD HIGHWAY INTERCHANGE LEGACY ISSUE DATE INDEX NUMBER NUMBER
PROPERTY
100 50 0 100 200
SCALE: 1" = 100'-0"
TOWN OF EVANS, ERIE COUNTY, NEW YORK
1864 EDEN EVANS CENTER ROAD
EDEN EVANS CENTER ROAD
OVERALL PLAN MAP LEGEND
N.T.S.
UTILITY POLE
SITE PLAN
SIGN
IRON PIPE W/ CAP
IRON ROD W/ CAP
TRANSMISSION WOOD STRUCTURE
DISTRIBUTION WOOD STRUCTURE
CONCRETE MONUMENT
CB
CATCH BASIN
CONTROL POINT
FIRE HYDRANT
GRAVEL DRIVE
W W WATER VALVE
GAS LINE MARKER
G
G G GAS VALVE
CB G
GATE
S
GA
NOW OR FORMERLY
EXISTING DECIDUOUS TREE
PROPERTY OF
SS JONATHAN PALMER & ROBERT HILL
TAX PARCEL 222.00-4-14.2 EXISTING CONIFEROUS TREE
DEED BOOK 11352 - PAGE 6972
GA
ROW
W
NE
ROW
S
RK
YO
AGRICULTURAL FIELD E
EDGE OF WOODS
OF E S
DS RI
UN E
BO -
EDGE OF BRUSH
GAS Y AY
RL UW
HE HR EDGE OF WATER
SS UT T
SOTATE
LETTER OF CONSENT
ERIE COUNTY GA
T
10' DRAINAGE DITCH S
MEN
P.R.# 992
CT
S
EDGE OF GRAVEL
AVE
IO
ROW
N
EDGE OF PAVEMENT
ROW
W
196.98'
F P
40.0'
N 00°38'26" E
GAS
CB W
190.56'
E O
CB
1839.24' (M)
OH OH
169.09' OH OH OH OH OH OH 1343.33'
OH
DRAINAGE DITCH
EDG
GRAVEL DRIVE X
BRIDGE
X X N
E GA CREEK/STREAM
X X RETENTION POND "
OH
EDEN EVANS CENTER ROAD (66-FOOT WIDTH)
50 S
OH 9' (M)
GAS
X °4
60 34'
SURVEYED PROPERTY
564.55' (M)
.
OHH 87
SS
X O X
OHH
O H
O PROPERTY LINE (LEGACY)
ROW
ROW
X OHH
O
OHH
G
AS NMPC EASEMENTS
X O H
GAS OH
O
PROPERTY LINE SETBACKS
S 83°49'16
W
X
OH OHH
O
DISTRIBUTION LINE CL
X OHH
PREPARED BY
O H " E GA
SS O
S TRANSMISSION LINE CL
FOUND
GAS
OHH
X O
OHH
PROPERTY OF COMMUNICATION WIRE
CONCRETE MONUMENT ROW
NEW YORK STATE THRUWAY
O H UNION CONCRETE & CONSTRUCTION CORP.
TER
X O
DISTURBED
SIS W WATER LINE
TLE TAX PARCEL 222.00-4-13
GA LIT CREEK H DEED BOOK 11200 - PAGE 748 GA
X RD 4 O H S FENCE
#7
CB CB
OH
GAS OH O
VI H
ERIE SECTION
OHH
X
EN OOH K
IR O H OH ELECTRIC LINE
OHH NK O
O H DU RIGHT-OF-WAY
E-
X ROW
ROW
O
LL 3 373.26 (M
H ND
#7 O H
GRAVEL DRIVE
VI
X
EVANS-EDEN (ANGOLA) INTERCHANGE
GAS STORM SEWER
PO SS
WSS
N 89°37'36" W
EN OH / W RD O H
RD OH
)
R O N
S OHH
GA
APPROVED APPROVED APPROVED APPROVED
IO
X
OH NE IN 12 GAS GAS GAS LINE
OHH RLI EBB
O '00
5. NT
T TE
X
O TE 1' GROUND CONTOUR
X X N -S 0.
11 RE
GAS CE LLE '00
5' GROUND CONTOUR
LOT 16 LOT 17 ROW
5
ROW
X X 12 X
'.0 S
5
14 2°5
100' WETLAND SETBACK
SS X X 14 75
. 7 3
. 19 '52
X 0.
X 0' '00 ' "
DELINEATED WETLAND
GAS
W
X (M E
PMM
X )
W W
584.13'
W
1756.53' (M) 866.91'
S 00°40'39" W X
TRC
CB
SOUTHERLY ROW OF EDEN EVANS CENTER ROAD
ROW
NORTHERLY ROW OF EDEN EVANS CENTER ROAD
ROW SURVEY NOTES:
EDGE OF PAVEMENT EDGE OF PAVEMENT
1. SURVEY PROVIDED BY: THEW ASSOCIATES LAND SURVEYORS (PROJECT TRC
NO. 5111-04-26; DATED 06/10/2026)
NOW OR FORMERLY
PROPERTY OF 2. THIS SURVEY IS REFERENCED HORIZONTALLY TO THE NORTH AMERICAN
STEVEN M. PTAK
DATUM OF 1983, 2011, ADJUSTMENT (NAD83/2011), PROJECTED ON
TAX PARCEL 222.00-4-12.1 THE NEW YORK STATE PLANE COORDINATE SYSTEM (WEST ZONE), AND
DEED BOOK 11012 - PAGE 8469
VERTICALLY TO THE NORTH AMERICAN VERTICAL DATUM OF 1988
(NAVD88).
TOWN OF EVANS, NY ZONING INFORMATION
ZONE: GENERAL BUSINESS (GB)
REQUIRED PROVIDED
MINIMUM LOT AREA: NONE NA
MINIMUM LOT WIDTH: 100' 465'
07/26 ISSUED FOR PERMIITING
MINIMUM YARD SETBACKS:
STRUCTURES PARKING, LOADING,
STACKING AREAS
FRONT 30' 15'
SIDE NA 10'
REAR 15' 10'
ISSUED FOR
PERMITTING
Page 24
X
07/23/26 X
L-100
3
X
N ORIGINAL
DRAWING SHEET
FILE
ISSUE DATE INDEX NUMBER NUMBER
100 50 0 100 200
SCALE: 1" = 100'-0"
TOWN OF EVANS, ERIE COUNTY, NEW YORK
1864 EDEN EVANS CENTER ROAD
EDEN EVANS CENTER ROAD
LANDSCAPE PLAN
LEGEND
SIGN
TRANSMISSION WOOD STRUCTURE
GRAVEL DRIVE DISTRIBUTION WOOD STRUCTURE
CB
CATCH BASIN
FIRE HYDRANT
G W W WATER VALVE
CB G
GAS LINE MARKER
G G GAS VALVE
GA
S GATE
NOW OR FORMERLY
PROPERTY OF
SS JONATHAN PALMER & ROBERT HILL EXISTING DECIDUOUS TREE
TAX PARCEL 222.00-4-14.2
DEED BOOK 11352 - PAGE 6972
ROW GA
S EXISTING CONIFEROUS TREE
ROW
AGRICULTURAL FIELD
EDGE OF WOODS
GAS EDGE OF BRUSH
SS
GA EDGE OF WATER
EDG
S
E O
EDGE OF GRAVEL
ROW ROW
W
GAS F P EDGE OF PAVEMENT
CB W
CB
OH OH OH
AVE
OH OH OH OH OH OH
GRAVEL DRIVE X
BRIDGE DRAINAGE DITCH
X
X X X RETENTION POND
GA
S MEN
OH GAS ROW
CREEK/STREAM
EDEN EVANS CENTER ROAD (66-FOOT WIDTH)
OH X T
OHH
X OOHH
X SURVEYED PROPERTY
SS W
O H
O
PROPERTY LINE (LEGACY)
ROW X OHH
O GA
OHH S
X O H
O NMPC EASEMENTS
GAS OH OH
X PROPERTY LINE SETBACK
OHH
O
X OHH
O H GA
DISTRIBUTION LINE CL
SSW 0+00 O
S
ROW
OHH TRANSMISSION LINE CL
PROPERTY OF
GAS
X OOHH
NEW YORK STATE THRUWAY
O H
O TER
UNION CONCRETE & CONSTRUCTION CORP. COMMUNICATION WIRE
SIS
X
TLE TAX PARCEL 222.00-4-13
0+71 LIT CREEK WATER LINE
4 OHH DEED BOOK 11200 - PAGE 748 GA W
X #7 O S
OH OHH
CB CB
OH K
GAS IR FENCE
ERIE SECTION
VM3 O H
NK
X
O
W DU
E- OH ELECTRIC LINE
LL 3
#7 OHH
X VI
ROW EN H W D O H
RD OOH R/ S R O ND GA ROW RIGHT-OF-WAY
GRAVEL DRIVE X GA OHH NE IN OHH S
EVANS-EDEN (ANGOLA) INTERCHANGE
GAS PO
SS O H RLI TEBB O
O E
NT -S
N
IO
SS STORM SEWER
CE LLE
PREPARED BY
X
VI H NT GAS GAS GAS LINE
00 X EN OOH TE
28 0+ X X RD OHH
GA
W RE
0+ O H 1' GROUND CONTOUR
GAS ROW
O
5' GROUND CONTOUR
ROW
X X X
SS X X 100' WETLAND SETBACK
VM2 X X
GAS 0+00
X
W
X DELINEATED WETLAND
5+07
W W
W
X
CB
25'-WIDE VISUAL MITIGATION (VM)
ROW
APPROVED APPROVED APPROVED APPROVED
ROW VM1
PLANTINGS (15,150 SF)
EDGE OF PAVEMENT EDGE OF PAVEMENT
NOW OR FORMERLY
EXISTING VEGETATION TO REMAIN
PROPERTY OF (217,344 SF)
STEVEN M. PTAK
TAX PARCEL 222.00-4-12.1 PMM
DEED BOOK 11012 - PAGE 8469
LANDSCAPE CALCULATIONS TRC
TOTAL LOT SIZE SOUTH OF HWY 90 = 1,045,451 SF TRC
TOTAL LANDSCAPED AREA = 232,494 SF
= 22% OF TOTAL LOT SIZE SOUTH OF HWY 90
DESCRIPTION OF ISSUE OR REVISION
07/26 ISSUED FOR PERMIITING
ISSUED FOR
PERMITTING
Page 25
X
07/23/26 X
L-100
3
X
N ORIGINAL
DRAWING SHEET
FILE
ISSUE DATE INDEX NUMBER NUMBER
100 50 0 100 200
SCALE: 1" = 100'-0"
TOWN OF EVANS, ERIE COUNTY, NEW YORK
1864 EDEN EVANS CENTER ROAD
EDEN EVANS CENTER ROAD
LANDSCAPE PLAN
LEGEND
SIGN
TRANSMISSION WOOD STRUCTURE
GRAVEL DRIVE DISTRIBUTION WOOD STRUCTURE
CB
CATCH BASIN
FIRE HYDRANT
G W W WATER VALVE
CB G
GAS LINE MARKER
G G GAS VALVE
GA
S GATE
NOW OR FORMERLY
PROPERTY OF
SS JONATHAN PALMER & ROBERT HILL EXISTING DECIDUOUS TREE
TAX PARCEL 222.00-4-14.2
DEED BOOK 11352 - PAGE 6972
ROW GA
S EXISTING CONIFEROUS TREE
ROW
AGRICULTURAL FIELD
EDGE OF WOODS
GAS EDGE OF BRUSH
SS
GA EDGE OF WATER
F P
S
E O
EDGE OF GRAVEL
ROW
EDG
ROW
W
GAS EDGE OF PAVEMENT
CB W
CB
OH OH OH
T
OH OH OH OH OH OH
MEN
GRAVEL DRIVE X
BRIDGE DRAINAGE DITCH
AVE
X X S
X X GA
RETENTION POND
OH GAS ROW
CREEK/STREAM
EDEN EVANS CENTER ROAD (66-FOOT WIDTH)
OH X
OHH
X OOHH
X SURVEYED PROPERTY
SS W
O H
O
PROPERTY LINE (LEGACY)
ROW X OHH
O GA
OHH S
X O H
O NMPC EASEMENTS
GAS OH OH
X PROPERTY LINE SETBACK
OHH
O
X OHH
O H GA
DISTRIBUTION LINE CL
SSW 0+00 O
S
ROW
OHH TRANSMISSION LINE CL
PROPERTY OF
GAS
X OOHH
NEW YORK STATE THRUWAY
O H
O TER
UNION CONCRETE & CONSTRUCTION CORP. COMMUNICATION WIRE
SIS
X
TLE TAX PARCEL 222.00-4-13
0+71 LIT CREEK WATER LINE
4 OHH DEED BOOK 11200 - PAGE 748 GA W
X #7 O S
OH OHH
CB CB
OH K
GAS IR FENCE
ERIE SECTION
VM3 O H
NK
X
O
W DU
E- OH ELECTRIC LINE
LL 3
#7 OHH
X VI
ROW EN H W D O H
RD OOH R/ S R O ND GA ROW RIGHT-OF-WAY
GRAVEL DRIVE X GA OHH NE IN OHH S
EVANS-EDEN (ANGOLA) INTERCHANGE
GAS PO
SS O H RLI TEBB O
O E
NT -S
N
IO
SS STORM SEWER
CE LLE
PREPARED BY
X
VI H NT GAS GAS GAS LINE
28
X EN OOH TE
RD
0
W
0+ 0
0+ X X GA OHH RE
O H 100' WETLAND SETBACK
GAS ROW
O
DELINEATED WETLAND
ROW
X X X
SS X X
VM2 X X
GAS 0+00
X
W
X
25'-WIDE VISUAL MITIGATION (VM)
5+07
W W
W
PLANTINGS (15,150 SF)
X
CB
ROW
APPROVED APPROVED APPROVED APPROVED
ROW VM1 EXISTING VEGETATION TO REMAIN
(217,344 SF)
EDGE OF PAVEMENT EDGE OF PAVEMENT
NOW OR FORMERLY
PROPERTY OF
STEVEN M. PTAK
TAX PARCEL 222.00-4-12.1 PMM
DEED BOOK 11012 - PAGE 8469
LANDSCAPE CALCULATIONS TRC
TOTAL LOT SIZE SOUTH OF HWY 90 = 1,045,451 SF TRC
TOTAL LANDSCAPED AREA = 232,494 SF
= 22% OF TOTAL LOT SIZE SOUTH OF HWY 90
DESCRIPTION OF ISSUE OR REVISION
07/26 ISSUED FOR PERMIITING
ISSUED FOR
PERMITTING
Page 26
X
GENERAL LANDSCAPE AND SEEDING NOTES 07/23/26 X
L-200
4
ANY/ ALL PRUNING SHALL BE DONE
1. THE LANDSCAPE PLAN AND DETAILS ARE FOR LANDSCAPING INFORMATION ONLY. PLEASE REFER TO THE SITE LAYOUT PLAN, GRADING PLAN AND/OR UTILITIES PLAN FOR ALL OTHER IN ACCORDANCE WITH APPROVED
X
HORTICULTURAL STANDARDS TO
INFORMATION. PRESERVE THE NATURAL FORM OF DO NOT PRUNE, STAKE, OR WRAP TREES
THE SPECIFIC PLANTS. IF DEEMED WITH A STRONG CENTRAL LEADER
2. THE CONTRACTOR SHALL MONITOR AND GUARANTEE THAT ALL PLANTS, TREES, AND SHRUBS SHALL BE HEALTHY AND FREE OF DISEASE FOR A PERIOD OF (1) ONE YEAR AFTER SUBSTANTIAL NECESSARY AND APPROVED BY THE UNLESS DIRECTED TO DO SO BY THE
ORIGINAL
LANDSCAPE ARCHITECT, DESIGNER, LANDSCAPE ARCHITECT, DESIGNER, OR
COMPLETION AND ACCEPTANCE BY THE OWNER. CONTRACTOR SHALL REPLACE ANY DEAD OR UNHEALTHY PLANTS AT CONTRACTOR'S EXPENSE. FINAL ACCEPTANCE SHALL BE MADE IF ALL OR CERTIFIED ARBORIST, CERTIFIED ARBORIST. DRAWING SHEET
PLANTS MEET THE GUARANTEE REQUIREMENTS INCLUDING MAINTENANCE. MAINTENANCE RESPONSIBILITIES INCLUDE INVASIVE SPECIES MONITORING, REMOVAL, AND SUPPLEMENTATION. ONE-FOURTH TO ONE-THIRD OF THE FILE
ISSUE DATE
DO NOT PRUNE, STAKE, OR WRAP TREES
MONITORING OF THE PROJECT SITE SHALL OCCUR IN THE SPRING AND THE FALL TO DETERMINE THE PRESENCE OF INVASIVE SPECIES. SHOULD ANY INVASIVE SPECIES BE IDENTIFIED WITHIN WOOD AND/OR BRANCHES SHALL BE WITH A STRONG CENTRAL LEADER UNLESS INDEX NUMBER NUMBER
REMOVED TO BALANCE ROOT LOSS DIRECTED TO DO SO BY THE LANDSCAPE
THE PROJECT SITE, THE INVASIVE SPECIES SHALL BE REMOVED ACCORDING TO METHODS MOST LIKELY TO BE EFFECTIVE IN CONTROLLING THAT SPECIES AND SUPPLEMENTING ITS DUE TO TRANSPLANTING. ARCHITECT, DESIGNER, OR CERTIFIED
REPLACEMENT WITH APPROPRIATE VEGETATION AND SEED MIX IDENTIFIED (AND APPROVED) ON THIS PLAN AND/OR AN APPROVED EQUAL. ADDITIONAL MAINTENANCE RESPONSIBILITIES ARBORIST.
INCLUDE: APPROVED CULTIVATING, SPRAYING, WEEDING, WATERING, TIGHTENING OF TREE STRAP GUYS, PRUNING, FERTILIZING, MULCHING, AND ANY OTHER OPERATIONS NECESSARY TO 2" x 2" x 8'-0" BEVELED CEDAR OR TREES SHALL BE STAKED AT LEAST ONE HALF
MAINTAIN PLANT VIABILITY. MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER PLANTING AND CONTINUE FOR THE DURATION OF SOLAR ARRAY USE BY THE OWNER/OPERATOR AFTER FINAL HARDWOOD STAKES: USE 3 STAKES AND NO MORE THAN TWO THIRDS OF THE
ACCEPTANCE. WATERING DURING THE ESTABLISHMENT PERIOD SHALL BE PERFORMED USING A WATER TRUCK OR OTHER APPROVED METHOD AS REQUIRED FOR SUCCESSFUL PER TREE. STAKES SHALL BE DRIVEN WAY UP THE TREE USING NYLON BELT-LIKE
6"-8" OUTSIDE OF ROOT BALL AND 2"x2"x8'-0" CEDAR OR HARDWOOD STAKES OR MATERIAL OR APPROVED EQUAL. ALL
ESTABLISHMENT. SHOULD ALLOW FOR FLEXIBILITY IN APPROVED EQUAL. STAKES (2 PER TREE STAKING MATERIAL SHALL BE REMOVED AT
TOWN OF EVANS, ERIE COUNTY, NEW YORK
THE TREE TRUNK. DO NOT OPPOSITE OF EACH OTHER) SHALL BE DRIVEN THE END OF 1 YEAR.
OVERDRAW TREE STAKES.
3. THE CONTRACTOR SHALL SUPPLY ALL LABOR, PLANTS, APPROVED SEEDING MIX, AND MATERIALS IN QUANTITIES SUFFICIENT TO COMPLETE THE WORK SHOWN ON THE DRAWING(S) AND LISTED 6"-8" OUTSIDE OF ROOT BALL. STAKING
SHOULD ALLOW FOR FLEXIBILITY IN THE TREE
IN THE PLANT SCHEDULE(S) AND/OR SEEDING TABLE(S). IN THE EVENT OF A DISCREPANCY BETWEEN QUANTITIES SHOWN IN THE PLANT SCHEDULE AND/OR SEEDING TABLE AND THOSE TRUNK. DO NOT OVERDRAW TREE STAKES.
REQUIRED BY THE DRAWINGS, THE LARGER SHALL APPLY. ALL PLANTS SHALL BE ACCLIMATED BY THE SUPPLY NURSERY TO THE LOCAL HARDINESS ZONE AND BE CERTIFIED THAT THE PLANTING
1864 EDEN EVANS CENTER ROAD
REMOVE TOP ONE-THIRD OF TREES SHALL BE STAKED USING NYLON
MATERIAL HAS BEEN GROWN FOR A MINIMUM OF (2) TWO YEARS AT THE SOURCE AND OBTAINED WITHIN 200 MILES OF PROJECT SITE UNLESS OTHERWISE APPROVED BY OWNER, CERTIFIED BURLAP AND WIRE BASKET BELT-LIKE MATERIAL OR APPROVED EQUAL.
LANDSCAPE INSPECTOR, OR LANDSCAPE ARCHITECT. FROM ROOTBALL ALL STAKING MATERIAL SHALL BE REMOVED REMOVE TOP ONE-THIRD OF
EDEN EVANS CENTER ROAD
AT THE END OF ONE YEAR. BURLAP AND WIRE BASKET
MULCH LAYER 3" - 4" THICK (TYP.)
SOIL SAUCER OR BERM FROM ROOTBALL
4. THE LOCATIONS FOR PLANT MATERIAL ARE APPROXIMATE AND ARE SUBJECT TO FIELD ADJUSTMENT DUE TO SLOPE, VEGETATION, AND SITE FACTORS SUCH AS THE LOCATION OF ROCK NOT MORE THAN 1" THICK MULCH TREE WRAP (AS DIRECTED,
LANDSCAPE DETAILS
LAYER SHALL BE PLACED ON TOP SPECIFIED, AND/OR REQUIRED) (APPROXIMATELY 3" DEEP TYP.)
OUTCROPS. PRIOR TO PLANTING THE CONTRACTOR SHALL ACCURATELY STAKE OUT THE LOCATIONS FOR ALL PLANTS. THE OWNER, CERTIFIED LANDSCAPE INSPECTOR, OR LANDSCAPE OF ROOTBALL
ARCHITECT SHALL APPROVE THE FIELD LOCATIONS OR ADJUSTMENTS OF THE PLANT MATERIAL. SET TOP OF ROOTBALL
CONSTRUCT TOPSOIL SAUCER SLIGHTLY HIGHER ABOVE 2"-3" DEEP MULCH
OR BERM 3" HIGH BEYOND FINISHED GRADE
5. ALL SHRUB MASSING SHALL BE MULCHED TO A DEPTH OF 2" AND SHREDDED HARDWOOD BARK MULCH SHALL BE USED FOR SHRUB MASSING AREAS. RADIUS OF ROOTBALL (TYP.)
3" BELOW FINISHED GRADE BACKFILL WITH EXISTING SOIL OR
GRADE ∠ = FINISHED GRADE
6. NO PLANT SHALL BE PLACED IN THE GROUND BEFORE ROUGH GRADING HAS BEEN COMPLETED AND APPROVED BY THE OWNER, CERTIFIED LANDSCAPE INSPECTOR, OR LANDSCAPE AMENDED PLANTING MIX
45°
(ONLY IF SPECIFIED/RECOMMENDED)
CONTRACTOR. STAKING THE LOCATION OF ALL TREES AND SHRUBS SHALL BE COMPLETED PRIOR TO PLANTING FOR APPROVAL BY THE OWNER, CERTIFIED LANDSCAPE INSPECTOR, OR TOPSOIL 36
"M
30"
30" MIN.
LANDSCAPE ARCHITECT. STAKING OF THE INSTALLED TREE MUST BE COMPLETED THE SAME DAY AS IT IS INSTALLED. ALL TREES SHALL BE STAKED OR GUYED AS PER THE DETAIL. SEE IN
. TOPSOIL
LANDSCAPING PLAN(S) FOR PLANTING DETAILS. MIN.
SCARIFY/BREAK UP
2" x 2" STAKES SIDES OF PLANTING
SUBSOIL
6" HOLE THAT ARE GLAZED
7. COORDINATE PLANT MATERIAL LOCATIONS WITH SITE UTILITIES. SEE SITE LAYOUT, GRADING AND/OR UTILITY PLANS FOR STORM, SANITARY, GAS, ELECTRIC, TELEPHONE AND WATER LINES. 6"
OR HARDENED
TAMP PLANTING MIX AROUND MIN. MIN.
UTILITY LOCATIONS ARE APPROXIMATE. EXERCISE CARE WHEN DIGGING IN AREAS OF POTENTIAL CONFLICT WITH UNDERGROUND OR OVERHEAD UTILITIES. THE CONTRACTOR IS RESPONSIBLE SUBSOIL
BASE TO STABILIZE TREE
FOR ANY DAMAGE DUE TO CONTRACTOR'S NEGLIGENCE AND SHALL REPLACE OR REPAIR ANY DAMAGE AT CONTRACTOR'S EXPENSE. 12" 12"
LOOSEN OR SCARIFY GLAZED MIN. MIN.
THE DEPTH OF THE HOLE SHALL EQUAL
SIDES OR HARDENED SURFACES
8. LANDSCAPE PLANTING PITS MUST BE FREE DRAINING. PAVEMENT, COMPACTED SUBGRADE, AND BLASTED ROCK SHALL BE REMOVED TO A DEPTH OF 2' OR TO A GREATER DEPTH IF REQUIRED THE HEIGHT OF THE ROOTBALL
STAKING EQUALS 2X ROOTBALL GUYING
BY PLANTING DETAILS OR SPECIFICATIONS. REPLACE SOIL WITH MODERATELY COMPACTED LOAM OR SANDY LOAM FREE FROM STONES AND RUBBISH 1" OR GREATER IN DIAMETER AND ANY COMPACT PLANTING MIX UNDER
DIAMETER (MIN.)
ROOTBALL AND SLOPE TOWARDS FOR TREES < 3" CAL. FOR TREES > 3" CAL.
OTHER MATERIAL HARMFUL TO PLANT GROWTH AND DEVELOPMENT. PLANTING INSTALLATION SHALL BE AS DETAILED AND CONTAIN PLANTING MIX AS SPECIFIED UNLESS RECOMMENDED PERIMETER OF PIT COMPACT PLANTING MIX UNDER
OTHERWISE BY SOIL ANALYSIS. ROOTBALL AND SLOPE TOWARDS
PERIMETER OF PIT
PLANTING SOIL MIXTURE:
NATIVE/DECIDUOUS TREE PLANTING DETAIL EVERGREEN TREE PLANTING DETAIL
2 PARTS PEAT MOSS
N.T.S. N.T.S.
5 PARTS TOPSOIL NOTES:
MYCORRHIZA INOCULANT - "TRANSPLANT 1-STEP" AS MANUFACTURED BY ROOTS, INC. OR APPROVED EQUAL. USE PER MANUFACTURER'S RECOMMENDATIONS FOR TREES AND SHRUBS. NOTES:
FERTILIZER/LIME APPLY AS RECOMMENDED BY SOIL ANALYSIS · TREE PLANTING SHALL BEAR SAME RELATIONSHIP TO FINISH GRADE AS IT WAS PRE-DUG IN THE NURSERY.
· TREE PLANTING SHALL BEAR SAME RELATIONSHIP TO FINISH GRADE AS IT WAS PRE-DUG IN THE NURSERY.
· NEVER CUT THE PRIMARY LEADER.
· TREES, AND SHRUBS: TREES AND SHRUBS SHALL BE NURSERY GROWN UNLESS OTHERWISE NOTED AND HARDY UNDER CLIMATIC CONDITIONS SIMILAR TO THOSE IN THE LOCATION OF THE · NEVER CUT THE PRIMARY LEADER.
PROJECT. THEY SHALL BE TYPICAL OF THEIR SPECIES OR VARIETY, WITH NORMAL HABIT OF GROWTH. THEY SHALL BE SOUND, HEALTHY, VIGOROUS, WELL-BRANCHED AND DENSELY · IT IS NOT RECOMMENDED TO AMEND THE EXISTING SOIL BEFORE BACKFILLING THE HOLE UNLESS SOIL
· IT IS NOT RECOMMENDED TO AMEND THE EXISTING SOIL BEFORE BACKFILLING THE HOLE UNLESS SOIL CONDITIONS CONDITIONS ARE POOR FOR PLANTING.
FOLIATED WHEN IN LEAF. THEY SHALL BE FREE OF DISEASE, INSECT PESTS, EGGS OR LARVAE. THEY SHALL HAVE HEALTHY AND WELL-DEVELOPED ROOT SYSTEMS. ALL TREES SHALL HAVE ARE POOR FOR PLANTING.
STRAIGHT SINGLE TRUNKS WITH THEIR MAIN LEADER INTACT UNLESS OTHERWISE STATED. THE OWNER, CERTIFIED LANDSCAPE INSPECTOR, LANDSCAPE ARCHITECT SHALL ONLY PERMIT · WATER THOROUGHLY TO HELP ENSURE THE REMOVAL OF AIR POCKETS AND PROPERLY SET THE TREE.
· WATER THOROUGHLY TO HELP ENSURE THE REMOVAL OF AIR POCKETS AND PROPERLY SET THE TREE.
SUBSTITUTIONS UPON WRITTEN APPROVAL. THEIR SIZES SHALL CONFORM TO THE MEASUREMENT SPECIFIED ON THE DRAWINGS. PLANTS LARGER THAN SPECIFIED ON THE DRAWINGS MAY
BE USED IF APPROVED. THE USE OF SUCH PLANTS SHALL NOT INCREASE THE CONTRACT PRICE. ALL TREES AND SHRUBS SHALL BE MULCHED IN ACCORDANCE WITH THE RESPECTIVE
PLANTING DETAIL(S) PROVIDED IN THE LANDSCAPING PLAN.
· ALL PRUNING SHALL CONFORM TO THE TREE CARE INDUSTRY ASSOCIATION (TCIA) ANSI A300 (PART 1) - 2017 PRUNING STANDARDS. PRUNING STANDARDS SHALL RECOGNIZE BUT, ARE NOT
LIMITED TO, THE FOLLOWING PRUNING OBJECTIVES: MANAGE RISK, MANAGE HEALTH, DEVELOP STRUCTURE, PROVIDE CLEARANCE, MANAGE SIZE OR SHAPE, IMPROVE AESTHETICS,
MANAGE PRODUCTION OF FRUIT, FLOWERS, OR OTHER PRODUCTS, AND/OR MANAGE WILDLIFE HABITAT. DEVELOPING STRUCTURE SHALL IMPROVE BRANCH AND TRUNK ARCHITECTURE,
PROMOTE OR SUBORDINATE CERTAIN LEADERS, STEMS, OR BRANCHES; PROMOTE DESIRABLE BRANCH SPACING; PROMOTE OR DISCOURAGE GROWTH IN A PARTICULAR DIRECTION
(DIRECTIONAL PRUNING); MINIMIZE FUTURE INTERFERENCE WITH TRAFFIC, LINES OF SIGHT, INFRASTRUCTURE, OR OTHER PLANTS; RESTORE PLANTS FOLLOWING DAMAGE; AND/OR
PRUNE ALL DAMAGED OR DEAD MULCH LAYER 3" - 4" THICK (TYP.) NOT
REJUVENATE SHRUBS. PROVIDING CLEARANCE SHALL ENSURE SAFE AND RELIABLE UTILITY SERVICES; MINIMIZE CURRENT INTERFERENCE WITH TRAFFIC, LINES OF SITE, INFRASTRUCTURE, WOOD/BRANCHES PRIOR TO PLANTING MORE THAN 1" THICK MULCH LAYER
OR OTHER PLANTS; RAISE CROWN(S) FOR MOVEMENT OF TRAFFIC OR LIGHT PENETRATION; ENSURE LINES OF SIGHT OR DESIRED VIEWS; PROVIDE ACCESS TO SITES, BUILDINGS, OR OTHER SHALL BE PLACED ON TOP OF ROOTBALL
STRUCTURES; AND/OR COMPLY WITH REGULATIONS.
CONSTRUCT TOPSOIL SAUCER OR
· TOPSOIL SHALL BE INSTALLED AT A MINIMUM DEPTH OF 4 INCHES. CONTRACTOR SHALL SUBMIT TOPSOIL TO A CERTIFIED TESTING LABORATORY TO DETERMINE PH, FERTILITY, ORGANIC SET TOP OF ROOTBALL BERM 3" HIGH X 12" WIDE (MIN.) ABOVE
SLIGHTLY HIGHER ABOVE THE ROOTBALL SURFACE AND AROUND
CONTENT AND MECHANICAL COMPOSITION. THE CONTRACTOR SHALL SUBMIT THE TEST RESULTS FROM REGIONAL EXTENSION OFFICE OF USDA TO THE OWNER, CERTIFIED LANDSCAPE THE ROOTBALL PERIMETER
FINISHED GRADE
INSPECTOR, OR LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL. CONTRACTOR SHALL INCORPORATE AMENDMENTS FOR GOOD PLANT GROWTH AND PROPER SOIL ACIDITY
REMOVE TOP ONE-THIRD OF BURLAP
RECOMMENDED FROM THE TOPSOIL TEST. AND WIRE BASKET FROM ROOTBALL
· NO PHOSPHOROUS SHALL BE USED AT PLANTING TIME UNLESS SOIL TESTING HAS BEEN COMPLETED AND TESTED BY A HORTICULTURAL TESTING LAB AND SOIL TESTS SPECIFICALLY TOPSOIL
BACKFILL WITH EXISTING SOIL OR SUBSOIL
INDICATE A PHOSPHOROUS DEFICIENCY THAT IS HARMFUL, OR WILL PREVENT NEW LAWNS/GRASSES AND PLANTINGS FROM ESTABLISHING PROPERLY. AMENDED PLANTING MIX
6" LOOSEN OR SCARIFY SIDES OF ROOTBALL
(ONLY IF SPECIFIED/RECOMMENDED)
MIN.
· IF SOIL TESTS INDICATE A PHOSPHOROUS DEFICIENCY THAT WILL IMPACT PLANT AND LAWN ESTABLISHMENT, PHOSPHOROUS SHALL BE APPLIED AT THE MINIMUM RECOMMENDED LEVEL 6" 6" 6"
BACKFILL WITH EXISTING SOIL OR
LOOSEN OR SCARIFY MIN. MIN. MIN.
PRESCRIBED IN THE SOIL TEST FOLLOWING ALL APPLICABLE STANDARDS, REQUIREMENTS, AND/OR REGULATIONS. GLAZED SIDES OR
AMENDED PLANTING MIX
EQUALS 2X EQUALS 2X (ONLY IF SPECIFIED/RECOMMENDED)
HARDENED SURFACES ROOTBALL DIA. ROOTBALL DIA.
PREPARED BY
· ALL SLOPES GREATER THAN 3:1 RECEIVING A WILDFLOWER, WETLAND, AND/OR GRASS SEEDING MIXTURE SHALL BE COVERED WITH AN EROSION CONTROL BLANKET.
CONTAINER GROWN
· ALL WILDFLOWERS AND GRASSES SOWED SHALL BE ALLOWED TO GROW TO THEIR NATURALLY OCCURRING HEIGHTS WHENEVER POSSIBLE. NATIVE WILDFLOWERS AND/OR GRASSES CAN
BE MOWED/MAINTAINED (WITHIN ACCEPTABLE AREAS IDENTIFIED AND/OR APPROVED BY APPROPRIATE REGULATORY AGENCIES) AS OFTEN AS NEEDED TO KEEP THE VEGETATION AT A SHRUB PLANTING DETAIL
DESIRED AND/OR MANAGEABLE/MANICURED HEIGHT.
N.T.S.
NOTE:
9. INVASIVE SPECIES SHALL NOT BE PERMITTED.
· IN AREAS WITH MASS PLANTINGS, CONTINUOUS EXCAVATION AND MULCHING PRACTICES SHALL
BE IMPLEMENTED WHENEVER POSSIBLE
10. ALL PLANT MATERIAL SHALL CONFORM TO THE PLAN SIZE SPECIFICATIONS AS ESTABLISHED BY THE AMERICAN STANDARD FOR NURSERY STOCK LATEST EDITION.
ISSUED FOR · IT IS NOT RECOMMENDED TO AMEND THE EXISTING SOIL BEFORE BACKFILLING THE HOLE
UNLESS SOIL CONDITIONS ARE POOR FOR PLANTING.
PERMITTING · WATER THOROUGHLY TO HELP ENSURE THE REMOVAL OF AIR POCKETS.
APPROVED APPROVED APPROVED APPROVED
LEGEND VISUAL MITIGATION PLANTING TEMPLATE LEGEND VISUAL MITIGATION PLANTING TEMPLATE
LANDSCAPE PLANTING SCHEDULE (TYPICAL VISUAL BUFFER/SCREENING EFFORT) VM1, VM2 AND VM3 = 606 LINEAR FEET
DECIDUOUS AND EVERGREEN TREES DECIDUOUS AND EVERGREEN TREES PMM
100' BOTANICAL NAME/ MATURE
SYMBOL QUANTITY SIZE ROOT SYMBOL BOTANICAL NAME/ MATURE
COMMON PLANT NAME HEIGHT QUANTITY SIZE ROOT
COMMON PLANT NAME HEIGHT
AA
AMELANCHIER ARBOREA
DOWNY SHADBUSH 2
6'-8' HT.
CLUMP B&B
15'-20'
HT. AA
AMELANCHIER ARBOREA
6
6'-8' HT.
B&B
15'-20' TRC
DOWNY SHADBUSH CLUMP HT.
1 HV 1 CF
3 AR CORNUS FLORIDA 15'-25' CORNUS FLORIDA
CF 2 1" CAL. MIN. B&B 1" CAL. MIN. 15'-25'
3 VC 3 CS 3 VC FLOWERING DOGWOOD HT. CF FLOWERING DOGWOOD 4 B&B
1 AA 1 CF 1 AA HT.
1 HV
JUNIPERUS VIRGINIANA
TRC
4 AR 3 IV 1 TO 1 TO 40'-50' JUNIPERUS VIRGINIANA 40'-50'
JV EASTERN RED CEDAR 15 5'-6' HT. B&B JV 29 5'-6' HT. B&B
HT. EASTERN RED CEDAR HT.
PICEA GLAUCA 40'-60' PICEA GLAUCA 40'-60'
PG WHITE SPRUCE 6 5'-6' HT. B&B PG 14 5'-6' HT. B&B
HT. WHITE SPRUCE HT.
THUJA OCCIDENTALIS 40'-50' THUJA OCCIDENTALIS 40'-50'
TO NORTHERN WHITE CEDAR 4 5'-6' HT. B&B TO 7 5'-6' HT. B&B
HT. NORTHERN WHITE CEDAR HT.
25'
SHRUBS SHRUBS
SYMBOL BOTANICAL NAME/ MATURE BOTANICAL NAME/ MATURE
QUANTITY SIZE ROOT SYMBOL QUANTITY SIZE ROOT
COMMON PLANT NAME HEIGHT COMMON PLANT NAME HEIGHT
ARONIA ARBUTIFOLIA ARONIA ARBUTIFOLIA
AR RED CHOKEBERRY 7 24"-30" #3/5 CONT. 7'-10' HT. AR 17 24"-30" #3/5 CONT. 7'-10' HT.
HT. RED CHOKEBERRY
HT.
CORNUS SERICEA CORNUS SERICEA
CS RED TWIG DOGWOOD 3 24"-30" #3/5 CONT. 7'-9' HT. CS 3 24"-30" #3/5 CONT. 7'-9' HT.
HT. RED TWIG DOGWOOD
HT.
HAMAMELIS VIRGINIANA 15'-25' HAMAMELIS VIRGINIANA 15'-25'
HV COMMON WITCH HAZEL 2 3'-4' HT. B&B HV 3 3'-4' HT. B&B
HT. COMMON WITCH HAZEL HT.
3
2 PB
PG
DESCRIPTION OF ISSUE OR REVISION
07/26 ISSUED FOR PERMIITING
ILEX VERTICILLATA 10'-12' ILEX VERTICILLATA 10'-12'
1 JV PB
3 PG 7 JV TO
2 TC 13 PG
PB 5 JV 2 JV IV COMMON WINTERBERRY 3 24"-30" #3/5 CONT. IV 6 24"-30" #3/5 CONT.
HT. COMMON WINTERBERRY HT.
HT. HT.
VACCINIUM CORYMBOSUM VACCINIUM CORYMBOSUM
300' VC HIGHBUSH BLUEBERRY 6 24"-30" #3/5 CONT. 6'-12' HT. VC 9 24"-30" #3/5 CONT. 6'-12' HT.
HT. HIGHBUSH BLUEBERRY
HT.
VISUAL MITIGATION PLANTING TEMPLATE VISUAL MITIGATION PLANTING TOTALS
N.T.S. N.T.S.
Page 27
Exhibit 4 – Full Environmental Assessment
Form (FEAF)
Page 28
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
Full Environmental Assessment Form
Part 1 - Project and Setting
Instructions for Completing Part 1
Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding,
are subject to public review, and may be subject to further verification.
Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to
any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist,
or is not reasonably available to the sponsor; and, when possible, generally describe work or studies that would be necessary to
update or fully develop that information.
Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that
must be answered either “Yes” or “No.” If the answer to the initial question is “Yes,” complete the following sub-questions. If the
answer to the initial question is “No,” proceed to the next question. Section F allows the project sponsor to identify and attach
additional information. Section G requires the name and signature of the applicant or project sponsor to verify the information in Part
1 is accurate and complete.
A. Project and Applicant/Sponsor Information.
Name of Action or Project:
Edens-Evans Marshalling Yard
Project Location (describe and attach a general location map):
Address: 1864 Eden Evans Center Road, Town of Evans, Erie County, New York, 14057. Tax Parcel ID: 222.00-4-13
Brief Description of Proposed Action (include purpose or need):
This site was previously used by National Grid as a marshalling yard for the Gardenville-Dunkirk 141/142 Northern
Section Rebuild Project (Matter No. 18-T-0561). National Grid plans to use the existing marshalling yard with minimal site
improvements. The current conditions include an existing gravel area which comprises the marshalling yard is
approximately 13.5 acres in size and is crossed by 73/74 transmission lines owned by National Grid. For the Proposed
Action, National Grid is proposing to make minor updates to the site to use the yard as a permanent National Grid
storage/marshalling facility. Grading (except for the filling of a few potholes and ruts) and below grade disturbance is not
anticipated. While the existing yard is an impervious gravel area with permanent fencing and gates, National Grid expects
that a few perimeter controls may be needed as part of the site upgrades.
Name of Applicant/Sponsor: Telephone: n/a
National Grid E-Mail:
n/a
Address:
330 Erie Boulevard West
City/PO: State: Zip Code:
Syracuse NY 13202
Project Contact (if not same as sponsor; give name and title/role): Telephone: 716-862-5167
Chris Hughes, Project Manager E-Mail: [email protected]
Address:
144 Kensington Ave
City/PO: State: Zip Code:
Buffalo NY 14214
Property Owner (if not same as sponsor): Telephone: 716-822-5755
Union Concrete & Construction Corp E-Mail:
n/a
Address:
435 Meyer Road
City/PO: State: Zip Code:
West Seneca NY 14224
Page 1 of 15 FEAF 2026
Page 29
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
B. Government Approvals
B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial
assistance.)
Government Entity If Yes: Identify Agency and Approval(s) Application Date
Required (Actual or
projected)
a. City Council, Town Board, 9 Yes 9✔ No
or Village Board of Trustees
b. City, Town or Village 9✔ Yes 9 No
Site Plan Application
Planning Board or Commission (Town of Evans Planning Board) August 2026
c. City, Town or 9✔ Yes 9 No
Use Variance (Town of Evans Zoning Board of Appeals)
Village Zoning Board of Appeals August 2026
d. Other local agencies 9 Yes 9✔ No
e. County agencies 9 Yes 9✔ No
f. Regional agencies 9 Yes 9✔ No
g. State agencies 9 Yes 9✔ No
h. Federal agencies 9 Yes 9✔ No
i. Coastal Resources.
i. Is the project site within a Coastal Area or the waterfront area of a Designated Inland Waterway? 9 Yes 9✔ No
ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? 9 Yes No
✔
iii. Is the project site within a Coastal Erosion Hazard Area? 9 Yes 9✔ No
C. Planning and Zoning
C.1. Planning and zoning actions.
Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule, or regulation be the 9 Yes 9✔ No
only approval(s) that must be granted to enable the proposed action to proceed?
If Yes, complete sections C, F and G.
If No, proceed to question C.2 and complete all remaining sections and questions in Part 1
C.2. Adopted land use plans.
a. Do any municipally adopted (city, town, village, or county) comprehensive land use plan(s) include the site 9
✔
Yes 9 No
where the proposed action would be located?
If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action ✔ Yes No
would be located? 9
b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway; ✔ Yes No
Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan; 9 9
or other)?
If Yes, identify the plan(s):
NYS Heritage Areas:West Erie Canal Corridor
c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan Yes ✔ No
or an adopted municipal farmland protection plan? 9 9
If Yes, identify the plan(s):
Page 2 of 15 FEAF 2026
Page 30
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
d. Is the proposed action in a municipality with an adopted comprehensive or individual plan that addresses climate Yes ✔ No
change?
9 9
If Yes , identify the elements of the plan that are relevant to the action:
9 9
C.3. Zoning
9 9
a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance? ✔ Yes No
If Yes, what is the zoning classification(s) including any applicable overlay district?
General Business (GB) for the portion of the Parcel that the Project activities will be on and Rural Agricultural (RA) for the
northernmost portion of the Parcel, north of I90, that will remain undeveloped.
b. Is the use permitted or allowed by a special or conditional use permit? Yes ✔ No
c. Is a zoning change requested as part of the proposed action? Yes ✔ No
If Yes, what is the proposed new zoning for the site?
C.4. Existing community services.
a. In what school district is the project site located?
Eden Central School District
b. What police or other public protection forces serve the project site?
Town of Evans Police Department, New York State Police
c. Which fire protection and emergency medical services serve the project site?
Evans Center Volunteer Fire Department and Erie County EMS - Evans Quarters
d. What parks serve the project site?
Evans Town Park (6-miles to the west) and Evangola State Park (10 miles southwest)
D. Project Details
D.1. Proposed and Potential Development
a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all
components)? 9 9
Industrial
b. a. Total acreage of the site of the proposed action? 29.80 acres
b. Total acreage to be physically disturbed? 0.33 acres 9 9
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor? 29.80 acres
c. Is the proposed action an expansion of an existing project or use? 9 Yes9✔ No
If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units,
square feet)? % Units:
d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes9✔ No
If Yes,
i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types)
ii. Is a cluster/conservation layout proposed? Yes ✔ No
iii. Number of lots proposed?
iv. Minimum and maximum proposed lot sizes? Minimum Maximum
Page 3 of 15 FEAF 2026
Page 31
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
e. Will the proposed action be constructed in multiple phases? 9 Yes 9✔ No
i. If No, anticipated period of construction: 1 months
ii. If Yes:
Total number of phases anticipated
Anticipated commencement date of phase 1 (including demolition) month year
Anticipated completion date of final phase month year
Generally describe connections or relationships among phases, including any contingencies where progress of one phase may
determine timing or duration of future phases: 9 9
f. Does the project include new residential uses? Yes ✔ No
If Yes, show numbers of units proposed.
One Family Two Family Three Family Multiple Family (four or more) 9 9
Initial Phase
At completion
of all phases
9 9 9
g. Does the proposed action include new non-residential construction (including expansions)? Yes ✔ No
If Yes,
i. Total number of structures
ii. Dimensions (in feet) of largest proposed structure: height; width; and length
iii. Approximate extent of building space to be heated or cooled: square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any Yes ✔ No
liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
If Yes,
i. Purpose of the impoundment:
ii. If a water impoundment, the principal source of the water: Ground water Surface water streams 9 Other
9 specify:
iii. If other than water, identify the type of impounded/contained liquids and their source.
iv. Approximate size of the proposed impoundment. Volume: million gallons; surface area: acres
v. Dimensions of the proposed dam or impounding structure: height; length
vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):
D.2. Project Operations
a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? Yes ✔ No
(Not including general site preparation, grading or installation of utilities or foundations where all excavated
materials will remain onsite)
If Yes:
i .What is the purpose of the excavation or dredging?
ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
Volume (specify tons or cubic yards): 9 9
Over what duration of time?
iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.
iv. Will there be onsite dewatering or processing of excavated materials? Yes No
If yes, describe. 9 9
v. What is the total area to be dredged or excavated? acres
vi. What is the maximum area to be worked at any one time? acres
vii. What would be the maximum depth of excavation or dredging? feet
viii. Will the excavation require blasting? Yes No
ix. Summarize site reclamation goals and plan:
Page 4 of 15 FEAF 2026
Page 32
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes ✔ No
into any existing wetland, waterbody, shoreline, beach or adjacent area?
If Yes:
i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic
description):
ii. Describe how the proposed action would affect that waterbody or wetland, e.g., excavation, fill, placement of structures, or
alteration of channels, banks, and shorelines. Indicate extent of activities, alterations and additions in square feet or acres:
iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes No
If Yes, describe:
iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? Yes No
If Yes:
acres of aquatic vegetation proposed to be removed:___________________________
expected acreage of aquatic vegetation remaining after project completion:
purpose of proposed removal (e.g. beach clearing, invasive species control, boat access):
proposed method of plant removal:
if chemical/herbicide treatment will be used, specify product(s):
v. Describe any proposed reclamation/mitigation following disturbance:
c. Will the proposed action use, or create a new demand for water? Yes ✔ No
If Yes:
i. Total anticipated water usage/demand per day: gallons/day
ii. Will the proposed action obtain water from an existing public water supply? Yes No
If Yes:
Name of district or service area:
Does the existing public water supply have capacity to serve the proposal? Yes No
Is the project site in the existing district? Yes No
Is expansion of the district needed? Yes No
Do existing lines serve the project site? Yes No
iii. Will line extension within an existing district be necessary to supply the project? Yes No
If Yes:
Describe extensions or capacity expansions proposed to serve this project:
Source(s) of supply for the district:
iv. Is a new water supply district or service area proposed to be formed to serve the project site? Yes No
If, Yes:
Applicant/sponsor for new district:
Date application submitted or anticipated:
Proposed source(s) of supply for new district:
v. If a public water supply will not be used, describe plans to provide water supply for the project:
vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: gallons/minute.
Page 5 of 15 FEAF 2026
Page 33
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
d. Will the proposed action generate liquid wastes? Yes ✔ No
If Yes:
i. Total anticipated liquid waste generation per day: gallons/day
ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
approximate volumes or proportions of each):
iii. Will the proposed action use any existing public wastewater treatment facilities? Yes No
If Yes:
Name of wastewater treatment plant to be used:
Name of district: 9 9
Does the existing wastewater treatment plant have capacity to serve the project? Yes No
Is the project site in the existing district? Yes No
Is expansion of the district needed? Yes No
Do existing sewer lines serve the project site? Yes No
Will a line extension within an existing district be necessary to serve the project? Yes No
If Yes:
Describe extensions or capacity expansions proposed to serve this project:
9 9
iv. Will a new wastewater (sewage) treatment district be formed to serve the project site? Yes ✔ No
If Yes:
Applicant/sponsor for new district: 9 9
Date application submitted or anticipated:
What is the receiving water for the wastewater discharge?
v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed
receiving water (name and classification if surface discharge or describe subsurface disposal plans):
vi. Describe any plans or designs to capture, recycle or reuse liquid waste:
9 9
e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes ✔ No
sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point
source (i.e., sheet flow) during construction or post construction?
If Yes: 9
i. How much impervious surface will the project create in relation to total size of project parcel?
Square feet or acres (impervious surface)
Square feet or acres (parcel size)
ii. Describe types of new point sources.
iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties,
groundwater, on-site surface water, or off-site surface waters)?
9 9
If to surface waters, identify receiving water bodies or wetlands:
Will stormwater runoff flow to adjacent properties? Yes No
iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? Yes No
9 9
9 9
9 9
Page 6 of 15 FEAF 2026
Page 34
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes ✔ No
combustion, waste incineration, or other processes or operations?
If Yes, identify:
i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles)
______________________________________________________________________________________________________
ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers)
______________________________________________________________________________________________________
iii. Stationary sources during operations (e.g., process emissions, boilers, electric generation, surface coating)
______________________________________________________________________________________________________
g. Will any air emission sources named in D.2.f (above), require an Air Facility Registration, Air State Facility Yes ✔ No
Permit, Title IV Permit or Title V Permit?
If Yes:
i. Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration Yes No
requirements discussed in 6 NYCRR Part 231?
ii. As calculated in the air permit application, the proposed action has the potential to emit:
Tons/year (short tons) of carbon monoxide (CO)
Tons/year (short tons) of oxides of nitrogen (NOx)
Tons/year (short tons) of particulate matter (PM-10, PM-2.5)
Tons/year (short tons) of volatile organic compounds (VOC)
Tons/year (short tons) of sulfur dioxide (SO2)
iii. Will emissions of air contaminants from the proposed action described above exceed the corresponding major Yes No
source thresholds?
iv.Does the proposed action have the potential to emit 10 tons/year or more of any one designated hazardous air Yes No
pollutant or 25 tons/year or more of any combination of such hazardous air pollutants (6NYCRR 200.1(ag))?
If Yes, provide the total potential to emit hazardous air pollutants in short tons/year: _____________________________
h. Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions, such as carbon dioxide, methane,
nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxide
equivalents per year at any point in the lifetime of the proposed action (estimated using the carbon dioxide equivalent definition and
global warming potentials provided in 6 NYCRR Part 496)? Yes ✔ No
If Yes:
i. Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric):
ii. Describe any greenhouse gas capture, control, or elimination measures included in project design:
i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes ✔ No
quarry or landfill operations?
If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust):
j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial Yes ✔ No
new demand for transportation facilities or services?
If Yes:
i. When is the peak traffic expected (Check all that apply): Morning Evening Weekend
Randomly between hours of to .
ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks):
iii. Parking spaces: Existing Proposed Net increase/decrease
iv. Does the proposed action include any shared use parking? Yes No
v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe:
______________________________________________________________________________________________________________
vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site? Yes No
vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric Yes No
or other alternative fueled vehicles?
viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing Yes No
pedestrian or bicycle routes?
Page 7 of 15 FEAF 2026
Page 35
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
k. Will the proposed action (for commercial or industrial projects only) generate new or additional energy demand? Yes ✔ No
If Yes:
i. Estimate annual electricity demand during operation of the proposed action:
ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or
other):________________________________________________________________________________________________
iii. Will the proposed action require a new, or an upgrade, to an existing substation? Yes No
l. Hours of operation. Answer all items which apply.
i. During Construction: ii. During Operations:
Monday - Friday: 7am - 7pm Monday - Friday: 7am - 7pm
Saturday: 7am - 7pm Saturday: 7am - 7pm
Sunday: 7am - 7pm Sunday: 7am - 7pm
Holidays: 7am - 7pm Holidays: 7am - 7pm
m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes ✔ No
operation, or both?
If yes:
i. Provide details including sources, time of day and duration:
ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? Yes No
Describe:
n. Will the proposed action have outdoor lighting? Yes ✔ No
If yes:
i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures:
ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes No
Describe:
o. Does the proposed action have the potential to produce odors for more than one hour per day? Yes ✔ No
If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest
occupied structures:
p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) Yes ✔ No
or chemical products 185 gallons in above ground storage or any amount in underground storage?
If Yes:
i. Product(s) to be stored
ii. Volume(s) per unit time (e.g., month, year)
iii. Generally, describe the proposed storage facilities:
q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides Yes ✔ No
(i.e., herbicides, insecticide) during construction or operation?
If Yes:
i. Describe proposed treatment(s):
ii. Will the proposed action use Integrated Pest Management Practices? Yes No
Page 8 of 15 FEAF 2026
Page 36
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes ✔ No
of solid waste (excluding hazardous materials)?
If Yes:
i. Describe any solid waste(s) to be generated during construction or operation of the facility:
Construction: tons per (unit of time)
Operation : tons per (unit of time)
ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:
Construction:
Operation:
iii. Proposed disposal methods/facilities for solid waste generated on-site:
Construction:
Operation:
s. Does the proposed action include construction or modification of a solid waste management facility? Yes ✔ No
If Yes:
i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or9 9
other disposal activities):
ii. Anticipated rate of disposal/processing:
Tons/month, if transfer or other non-combustion/thermal treatment, or
Tons/hour, if combustion or thermal treatment
iii. If landfill, anticipated site life: years
t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes ✔ No
waste?
If Yes: 9 9
i. Name(s) of all hazardous wastes or constituents to be generated, handled, or managed at facility:
ii. Generally describe processes or activities involving hazardous wastes or constituents:
iii. Specify amount to be handled or generated tons/month
iv. Describe any proposals for on-site minimization, recycling, or reuse of hazardous constituents: 9
v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? Yes No
If Yes: provide name and location of facility:________________________________________________________________________
If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: 9 9
9
Page 9 of 15 FEAF 2026
Page 37
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
9 99
E. Site and Setting of Proposed Action
E.1. Land uses on and surrounding the project site
a. Existing land uses.
i. Check all uses that occur on, adjoining and near the project site.
9Urban ■9Industrial ■9Commercial 9Residential (suburban) 9Rural (non-farm)
■
■9Forest ■9Agriculture 9Aquatic 9Other (specify):
9 9
ii. If mix of uses, generally describe:
9
Existing land use for the Project Site is an industrial marshalling yard. Adjoining and nearby land uses are a mix, including those checked
above. Most notably is that an Interstate-90 off-ramp is directly adjacent to the Project Site. See Figure 1 for the land use map.
b. Land uses and cover types on the project site.
Land use or Current Acreage After 9 Change
9
Cover type Acreage Project Completion (Acres +/-)
Roads, buildings, and other paved or impervious
surfaces (total) -
- -
• Industrial or manufacturing 11.95 11.95 0
• Commercial 0 0 0
• Residential 0 0 0
Forested 2.48 2.48 0
Meadows, grasslands or brushlands (non-
agricultural, including abandoned agricultural) 4.77 4.44 -0.33
Agricultural
(includes active orchards, field, greenhouse, etc.) 0 0 0
Surface water features
(lakes, ponds, streams, rivers, etc.) 0.08 0.08 0
9 9
Wetlands (freshwater or tidal) 4.72 4.72 0
Non-vegetated (bare rock, earth, or fill) 0 0 0
Other, Describe: Landscaping for Visual Mitigation 0 0.33 9
+0.33 9
Page 10 of 15 FEAF 2026
Page 38
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
c. Is the project site presently used by members of the community for public recreation? 9 Yes 9■ No
i. If Yes: explain:
d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed 9 Yes 9■ No
day care centers, or group homes) within 1500 feet of the project site?
If Yes,
i. Identify facilities:
e. Does the project site contain an existing dam? 9 Yes 9■ No
If Yes:
i. Dimensions of the dam and impoundment:
Dam height: feet
Dam length: feet
Surface area: acres
Volume impounded: gallons OR acre-feet
ii. Dam’s existing hazard classification:
iii. Provide date and summarize results of last inspection:
f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, 9 Yes 9■ No
or does the project site adjoin property that is now, or was at one time, used as a solid waste management facility?
If Yes:
i. Has the facility been formally closed? 9 Yes 9 No
If Yes, cite sources/documentation:
ii. Describe the location of the project site relative to the boundaries of the solid waste management facility:
iii. Describe any development constraints due to the prior solid waste activities:
g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin 9 Yes 9■ No
property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste?
If Yes:
i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred:
h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any 9 Yes 9■ No
remedial actions been conducted at or adjacent to the proposed site?
If Yes:
i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site 9 Yes 9 No
Remediation database? Check all that apply:
9 Yes – Spills Incidents database Provide DEC ID number(s):
9 Yes – Environmental Site Remediation database Provide DEC ID number(s):
9 Neither database
ii. If site has been subject of RCRA corrective activities, describe control measures:
iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? 9 Yes 9■ No
If Yes, provide DEC ID number(s):
iv. If Yes to (i), (ii) or (iii) above, describe current status of site(s):
Page 11 of 15 FEAF 2026
Page 39
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
v. Is the project site subject to an institutional control limiting property uses? 9 Yes9 No
If Yes, DEC site ID number:
Describe the type of institutional control (e.g., deed restriction or easement):
Describe any use limitations:
Describe any engineering controls:
Will the project affect the institutional or engineering controls in place? 9 Yes9 No
Explain:
E.2. Natural Resources On or Near Project Site
a. What is the average depth to bedrock on the project site? 5 feet
b. Are there bedrock outcroppings on the project site? 9 Yes9 ■ No
If Yes, what proportion of the site is comprised of bedrock outcroppings? %
c. Predominant soil type(s) present on project site: Brockport silty clay loam 0-8% slope 34.6 %
________________________
Orpark silt loam 0-8% slope _________%
26.9
________________________
Remsen silty clay loam 0-3% slope _________%
17.2
d. What is the average depth to the water table on the project site? Average: 2.5 feet
e. Drainage status of project site soils: 9 Well Drained: % of site
9 Moderately Well Drained: % of site
9✔ Poorly Drained 100 % of site
f. Approximate proportion of proposed action site with slopes: 9✔ 0-10%: 94.26 % of site
9✔ 10-15%: 3.69 % of site
9✔ 15% or greater: 2.05 % of site
g. Are there any unique geologic features on the project site? 9 9
Yes ■ No
If Yes, describe:
h. Surface water features.
i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, 9■ Yes 9 No
ponds, or lakes)?
ii. Do any wetlands or other waterbodies adjoin the project site? 9■ Yes No
If Yes to either i or ii, continue. If No, skip to E.2.i.
iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, 9■ Yes No
state or local agency?
iv. For each identified regulated wetland and waterbody on the project site, provide the following information:
Streams: Name 838-6 Classification C
• Lakes or Ponds: Name n/a Classification n/a
• Wetlands: Name Federal Waters, Federal Waters, Federal Waters,... Approximate Size 11.6, see Wetland Report
• Wetland No. (if regulated by DEC)
v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired 9 Yes9 ■ No
waterbodies?
If Yes, name of impaired water body/bodies and basis for listing as impaired:
i. Is the project site in a designated Floodway? 9 9 ■ No
Yes
j. Is the project site in the 100-year Floodplain? 9 9
Yes ■ No
9 9
k. Is the project site in the 500-year Floodplain? Yes ■ No
9 9
l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? Yes ■ No
If Yes:
i. Name of aquifer:
Page 12 of 15 FEAF 2026
Page 40
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
m. Identify the predominant wildlife species that occupy or use the project site:
White-tailed deer Squirrels Eastern Cotton Rabbit
Red-winged blackbirds American Robins
n. Does the project site contain a designated significant natural community? 9 Yes 9■ No
If Yes:
i. Describe the habitat/community (composition, function, and basis for designation):
ii. Source(s) of description or evaluation:
iii. Extent of community/habitat:
Currently: acres
Following completion of project as proposed: acres
Gain or loss (indicate + or -): acres
o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as 9 Yes 9■ No
endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species?
If Yes:
i. Species and listing (endangered or threatened):
p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of 9 Yes 9■ No
special concern?
If Yes:
i. Species and listing:
q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? 9 Yes 9■ No
If Yes, give a brief description of how the proposed action may affect that use:
E.3. Designated Public Resources On or Near Project Site
a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to 9 Yes 9■ No
Agriculture and Markets Law, Article 25-AA, Section 303 and 304?
If Yes, provide county plus district name/number:
b. Are agricultural lands consisting of highly productive soils present? 9 Yes 9■ No
i. If Yes: acreage(s) on project site?
ii. Source(s) of soil rating(s):
c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National 9 Yes 9■ No
Natural Landmark?
If Yes:
i. Nature of the natural landmark: 9 Biological Community 9 Geological Feature
ii. Provide brief description of landmark, including values behind designation and approximate size/extent:
d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? 9 Yes 9■ No
If Yes:
i. CEA name:
ii. Basis for designation:
iii. Designating agency and date:
Page 13 of 15 FEAF 2026
Page 41
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district Yes ■ No
listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYSOffice of
Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places?
If Yes:
i. Nature of historic/archaeological resource: Archaeological Site Historic Building or District
ii. Name:
iii. Brief description of attributes on which listing is based:
f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for Yes ■ No
archaeological sites on the New York State Historic Preservation Office (SHPO) archaeological site inventory?
g. Have additional archaeological or historic site(s) or resources been identified on the project site? Yes ■ No
If Yes:
i. Describe possible resource(s):
ii. Basis for identification:
h. Is the project site within five miles of any officially designated and publicly accessible federal, state, or local ■ Yes No
scenic, or aesthetic resource?
If Yes:
i. Identify resource: Great Lakes Seaway Trail (Rt. 5)
ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail, or scenic byway,
etc.): NYS National Designated Scenic Byway
iii. Distance between project and resource: 4 miles.
i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers Yes ■ No
Program 6 NYCRR 666?
If Yes:
i. Identify the name of the river and its designation:
ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? Yes No
E.4. Disadvantaged Communities Designated Pursuant to ECL Article 75
a. Is the project located within, or within ½ mile of, a disadvantaged community? Yes ■ No
If No, could impacts(see examples below in E.4.b) from the project affect a disadvantaged community? Yes ■
No
If Yes to either question in E.4.a, answer the remaining questions in this section.
b. Will there be direct or indirect impacts that may affect a disadvantaged community, such as those listed below? Yes ■ No
i. new noise sources or expansions/modification of existing noise sources;
- noise from operational sources
- noise from construction activities
ii. emissions of air pollutants including, mobile emissions;
iii. wastewater discharges;
iv. generation of odors;
v. light pollution;
vi. new or modified radiation sources;
vii. new or modified sources of solid waste generation, management, or disposal.
If Yes, describe the impacts:
c. Do any of the State agency approvals identified in question B.g include any of the following DEC permits?
State Pollutant Discharge Elimination System (SPDES) Yes ■ No
Solid Waste Management Facility Yes ■ No
Hazardous Waste Management Facility Yes ■ No
Air Pollution Control (Title V or Air State Facility) Yes ■ No
Water Withdrawal over 20 MGD for Cooling Water Yes ■ No
Waste Transporter Yes ■ No
Page 14 of 15 FEAF 2026
Page 42
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
E.5 Future Physical Climate Risks
Will the proposed action be vulnerable to the following future physical climate risks under current or projected future conditions:
a. Is the proposed action vulnerable to damage from a projected 100-year flood? Yes No
b. Is the proposed action vulnerable to damage from a projected 500-year flood? Yes No
c. Is the proposed action in an area potentially affected by sea level rise? Yes ■ No
d. Will the proposed action increase the vulnerability of human or ecological communities to the following:
i. drought? Yes ■ No
ii. temperature extremes (hot or cold)? Yes ■ No
iii. extreme storms, including high winds? Yes ■ No
iv. landslides? Yes ■ No
v. coastal erosion? Yes ■ No
vi. stormwater flooding? Yes ■ No
vii. other climate or weather hazards? Yes ■ No If Yes, describe: _____________________________________
F. Additional Information
Attach any additional information which may be needed to clarify your project.
If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any
measures which you propose to avoid or minimize them.
G. Verification
I certify that the information provided is true to the best of my knowledge.
Applicant/Sponsor Name
National Grid, by: James Zuccolotto
Date
8/13/26
Signature Title
Director, Land Management
Page 15 of 15 FEAF 2026
Page 43
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
EAF Mapper Summary Report Thursday, July 23, 2026 12:13 PM
Disclaimer: The EAF Mapper is a screening tool intended to assist
project sponsors and reviewing agencies in preparing an environmental
assessment form (EAF). Not all questions asked in the EAF are
answered by the EAF Mapper. Additional information on any EAF
question can be obtained by consulting the EAF Workbooks. Although
the EAF Mapper provides the most up-to-date digital data available to
DEC, you may also need to contact local or other data sources to
confirm data provided by the Mapper or to obtain data not provided by
the Mapper.
B.i.i [Coastal or Waterfront Area] No
B.i.ii [Local Waterfront Revitalization Area] Yes
C.2.b. [Special Planning District] Yes - Digital mapping data are not available for all Special Planning Districts.
Refer to EAF Workbook.
C.2.b. [Special Planning District - Name] NYS Heritage Areas:West Erie Canal Corridor
E.1.h [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF
Potential Contamination History] Workbook.
E.1.h.i [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF
Listed] Workbook.
E.1.h.i [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF
Environmental Site Remediation Database] Workbook.
E.1.h.iii [Within 2,000' of DEC Remediation No
Site]
E.2.g [Unique Geologic Features] No
E.2.h.i [Surface Water Features] Yes - Digital mapping information on local, New York State, and federal
wetlands and waterbodies is known to be incomplete. Refer to the EAF
Workbook.
E.2.h.ii [Surface Water Features] Yes - Digital mapping information on local, New York State, and federal
wetlands and waterbodies is known to be incomplete. Refer to the EAF
Workbook.
E.2.h.iii [Surface Water Features] Yes - Digital mapping information on local, New York State, and federal
wetlands and waterbodies is known to be incomplete. Refer to the EAF
Workbook.
E.2.h.iv [Surface Water Features - Stream 838-6
Name]
E.2.h.iv [Surface Water Features - Stream C
Classification]
E.2.h.iv [Surface Water Features - Wetlands Federal Waters
Name]
Full Environmental Assessment Form - EAF Mapper Summary Report 1
Page 44
E.2.h.v
Docusign [Impaired
Envelope Water Bodies] No
ID: 0533D2F9-82ED-8823-8164-657BA77D727C
E.2.i. [Floodway] No
E.2.j. [100 Year Floodplain] No
E.2.k. [500 Year Floodplain] No
E.2.l. [Aquifers] No
E.2.n. [Natural Communities] No
E.2.o. [Endangered or Threatened Species] No
E.2.p. [Rare Plants or Animals] No
E.3.a. [Agricultural District] No
E.3.c. [National Natural Landmark] No
E.3.d [Critical Environmental Area] No
E.3.e. [National or State Register of Historic Digital mapping data are not available or are incomplete. Refer to EAF
Places or State Eligible Sites] Workbook.
E.3.f. [Archeological Sites] No
E.3.i. [Designated River Corridor] No
E.4.a [Disadvantaged Community] No
Full Environmental Assessment Form - EAF Mapper Summary Report 2
Page 45
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
d
lv
B
rn
te
LAYOUT NAME: EDENEVANS_FIG1_ZONING_8X11P
es
hw
ut
So
Little Sister
Creek 90
Pond
COORDINATE SYSTEM: NAD 1983 2011 STATEPLANE NEW YORK WEST FIPS 3103 FT US; MAP ROTATION: 0
Versailles Rd
90
Eden Evans Cen ter Rd
d
R
le s
Vers a il
90
-- SAVED BY: AKAILAS ON 4/2/2026, 12:34:56 PM; FILE PATH: \\EMPLOYEES\GIS\ARCGISPRO\1-PROJECTS\NATIONAL_GRID\717205_EVANSROADMARSHALLINYYARD\APRX\EVANSROAD_SCRATCH.APRX;
F
PROJECT PARCEL 23 DEVELOPED, MEDIUM PROJECT:
TOWN ZONING
INTENSITY EDEN-EVANS MARSHALLING YARD
AGRICULTURE & OPEN SPACE 24 DEVELOPED HIGH INTENSITY TOWN OF EVANS, ERIE COUNTY, NY
(AOS) 31 BARREN LAND (ROCK/SAND/
GENERAL BUSINESS (GB) CLAY) 0 500 1,000 TITLE:
41 DECIDUOUS FOREST
LIGHT INDUSTRIAL
42 EVERGREEN FOREST FEET LAND USE AND ZONING MAP
RURAL AGRICULTURE (RA)
43 MIXED FOREST
1:12,000 1" = 1,000'
NLCD CLASSIFICATION
DRAWN BY: A. KAILAS PROJ. NO.: 717205
11 OPEN WATER 81 PASTURE/HAY
82 CULTIVATED CROPS CHECKED BY: C. PEARCE
21 DEVELOPED, OPEN SPACE
22 DEVELOPED, LOW INTENSITY 90 WOODY WETLANDS APPROVED BY: C. PEARCE FIGURE 1
DATE: APRIL 2026
3 CORPORATE DRIVE
SUITE 202
CLIFTON PARK, NY 12065
BASE MAP: ESRI WORLD IMAGERY
DATA SOURCES: USGS, ESRI, NGRID, TOWN OF EVANS, TRC FILE: EVANSROAD_SCRATCH
Page 46
Exhibit 5 – National Grid Improvement Projects
– 15 Mile Radius Map
Page 47
CHEEKTOWAGA LANCASTER
BUFFALO
WEST SENECA
LACKAWANNA ELMA
LAYOUT NAME: EVANSRD_WDR_FIG_1_15MILES_8X11P
ORCHARD PARK
HAMBURG AURORA
COORDINATE SYSTEM: NAD 1983 STATEPLANE NEW YORK WEST FIPS 3103 FEET; MAP ROTATION: 0
EVANS EDEN BOSTON
COLDEN
BRANT
NORTH COLLINS
CONCORD
OUNTY
ERIE C
HANOVER COLLINS
SHERIDAN
PERRYSBURG
TY
N
CAT OU
TAR A U G U S C
CHAUTAUQUA COUNTY CATTARAUGUS COUNTY
ASHFORD
-- SAVED BY: AKAILAS ON 6/22/2026, 11:38:57 AM; FILE PATH: \\EMPLOYEES\GIS\ARCGISPRO\1-PROJECTS\NATIONAL_GRID\717205_EVANSROADMARSHALLINYYARD\APRX\EVANSRD_WDR.APRX;
PERSIA EAST OTTO
OTTO
ARKWRIGHT VILLENOVA DAYTON
ELLICOTTVILLE
F
PROJECT:
EXISTING NATIONAL GRID SUBSTATIONS
EDEN-EVANS MARSHALLING YARD
EXISTING NATIONAL GRID TRANSMISSION LINES TOWN OF EVANS, ERIE COUNTY, NY
0 2.5 5
EXISTING NATIONAL GRID SUB TRANSMISSION LINES TITLE:
MILES EXISTING NATIONAL GRID INFRASTRUCTURE
MARSHALLING YARD LOCATION
1" = 5 MILES WITHIN 15-MILES OF THE PROJECT
15 MILE BUFFER DRAWN BY: A. KAILAS PROJ. NO.: 717205
CHECKED BY: C. PEARCE
MUNICIPAL BOUNDARY APPROVED BY: C. SMITH FIGURE 1
COUNTY BOUNDARY DATE: JUNE 2026
215 GREENFIELD PKWY
STE 102
LIVERPOOL, NY 13088
BASE MAP: ESRI WORLD IMGARY BASEMAP PHONE: 315.671.1600
DATA SOURCES: USGS, ESRI, NGRID, TRC FILE: EVANSRD_WDR
Page 48
Exhibit 6 – Office of Parks, Recreation and
Historic Preservation Letter of No Impact
Page 49
4 wvoRK Parks, Recreation,
TEOF
oRTUNITY. and Historic Preservation
ANDREW M. CUOMO ERIK KULLESEID
Governor Commissioner
June 24, 2021
Ms. Karen E Mack
Senior Archaeologist/Project Manager
TRC
71 Oak St
Ellsworth, ME 04605
Re: USACE
Gardenville-Dunkirk 141/142 Northern Rebuild and Reconductor Project
Angola, Blasdell, Evans, Hamburg, Lackawanna & West Seneca, Erie County, NY
18PR00145
Dear Ms. Mack:
Thank you for requesting the comments of the New York State Historic Preservation Office
(SHPO). We have reviewed the Second Addendum Phase IB Archaeological Investigation
report prepared by TRC. (Mack, April 28, 2021; 19SR00190) in accordance with Section 106 of
the National Historic Preservation Act of 1966. These comments are those of the SHPO and
relate only to Historic/Cultural resources.
As per our September 11, 2019 letter, the SHPO noted that tower height changes for Segment
1 are significant at 41-feet. However, there are few historic resources in the identified area of
potential effect. Additionally, the SHPO has no concerns for the use of the newly proposed
marshaling yard at 1864 Eden Evans Center Road, Town of Evans, or the marshaling yard
south of Bayview Road and east of Structures 94 and 95 in the Town of Hamburg.
Therefore, it is the SHPO’s opinion that no properties, including archaeological and/or historic
resources, listed in or eligible for the New York State and National Registers of Historic Places
will be affected by this undertaking, and the SHPO concurs with the report's conclusion that no
further archaeological investigations are warranted. This recommendation pertains only to the
Area of Potential Effects (APE) examined during the above-referenced investigation. Should the
project design change, the SHPO recommends further consultation with this office.
If you have any questions, I can be reached via e-mail at [email protected].
Sincerely,
Josalyn Ferguson, Ph.D.
Scientist Archaeology via email only
c.c. Matthew Hyland, Rachel Silva & Tim Sara, TRC
Division for Historic Preservation
P.O. Box 189, Waterford, New York 12188-0189 • (518) 237-8643 • parks.ny.gov
Page 50
Exhibit 7 – New York State Public Service
Commission Order Approving Environmental
Management and Construction Plan Part A
Subject to Conditions, dated March 17, 2022
Page 51
STATE OF NEW YORK
PUBLIC SERVICE COMMISSION
At a session of the Public Service
Commission held in the City of
Albany on March 16, 2022
COMMISSIONERS PRESENT:
Rory M. Christian, Chair
Diane X. Burman
James S. Alesi
Tracey A. Edwards
John B. Howard
David J. Valesky
John B. Maggiore
CASE 18-T-0561 - Application of Niagara Mohawk Power Corporation
d/b/a National Grid for a Certificate of
Environmental Compatibility and Public Need
Pursuant to Article VII for its Gardenville-
Dunkirk Lines 141/142, Northern Section Rebuild
Project in Erie County.
ORDER APPROVING ENVIRONMENTAL MANAGEMENT
AND CONSTRUCTION PLAN PART A SUBJECT TO CONDITIONS
(Issued and Effective March 17, 2022)
BY THE COMMISSION:
INTRODUCTION AND BACKGROUND
On May 14, 2020, the Public Service Commission
(Commission) issued a Certificate of Environmental Compatibility
and Public Need (Certificate) to Niagara Mohawk Power
Corporation d/b/a National Grid (National Grid or Certificate
Holder). The Certificate authorizes, pursuant to the
requirements of Article VII of the Public Service Law (PSL), the
rebuild of two existing 115 kilovolt (kV) transmission lines,
the Gardenville-Dunkirk 141 and 142 lines, from the North Angola
Substation to existing structure 4 (just south of the
Page 52
CASE 18-T-0561
Gardenville Substation), for a distance of approximately 20.31
miles, in the Village of Angola, Town of Evans, Town of Hamburg,
Village of Blasdell, City of Lackawanna, and the Town of West
Seneca, all in the County of Erie (the Project).
The Project, as proposed and subsequently authorized
by the Commission, was expected to be grouped into one
Environmental Management & Construction Plan (EM&CP) filing. As
explained further below, the EM&CP is now expected to be grouped
into two or more filings. The first phase pertains to the
establishment of a marshalling yard located at Eden-Evans Center
Road, in the Town of Evans. This filing will be known as the
“EM&CP Part A.” All other construction will be covered in
subsequent EM&CP filings. This Order is only for the work
described in the EM&CP Part A filing.
The Certificate Conditions contain several
requirements for compliance, including a requirement that the
Certificate Holder submit for public review and Commission
approval plans detailing the Facility design, construction and
environmental controls. 1
On August 30, 2021, the Certificate Holder submitted
its proposed EM&CP filing for approval. Public notice of the
EM&CP filing for review and comment was served on each party on
the Service List and on landowners and/or residents of property
crossed by, or abutting, the Project right-of-way (ROW) and made
available at the public repositories listed on the Service List,
in accordance with Certificate Conditions 23 and 24. As further
required by Certificate Conditions 24, the Certificate Holder
published notice in three local newspapers of general
circulation. On August 31, 2021, the Certificate Holder filed
1 Case 18-T-0561, Order Granting Certificate of Environmental
Compatibility and Public Need (issued May 14, 2020),
Certificate Conditions 18-27.
-2-
Page 53
CASE 18-T-0561
affidavits of service. On September 14, 2021, the Certificate
Holder filed affidavits of publication. The 38-day comment
period, required by Certificate Condition 39(g), ended on
October 12, 2021. No public comments were received during the
38-day comment period; however, comments were submitted by the
New York State Thruway Authority generally advising the
Certificate Holder that the Project will be subject to Authority
Occupancy and Work Permit Accommodation Guidelines. Informal
comments were submitted by the Staff of the Department of Public
Service (DPS Staff) and the Department of Environmental
Conservation to the Certificate Holder on the overall EM&CP.
The Certificate Holder is expected to address those comments on
the overall EM&CP in its anticipated subsequent EM&CP filing,
and those comments are not germain to the Part A filing at issue
here. No further comments from community members, the various
Parties, or Municipalities have been received at this time.
Subsequent to filing the August 30, 2021, EM&CP
filing, the Certificate Holder determined that it required
approval for the use of the Eden-Evans Center Road marshalling
yard as soon as possible in order to begin receiving materials
including insulators, Optical Ground Wire (“OPGW”) and OPGW
hardware, conductors, anchor bolts, steel poles and other
hardware. The Certificate Holder explained that if it could not
begin receiving deliveries, it may face construction delays and
potential costs associated with those delays.
In light of this need, on February 11, 2022, the
Certificate Holder filed a revised EM&CP Part A pertaining to
only the Eden-Evans Center Road marshalling yard. The
Certificate Holder addressed informal comments provided by DPS
Staff in its EM&CP Part A filing that were specific to the Part
A filing.
-3-
Page 54
CASE 18-T-0561
This Order approves the EM&CP Part A filing so that
the Certificate Holder may begin establishment of the Eden-Evans
Center Road marshalling yard pursuant to the Certificate.
THE EM&CP, COMMENTS AND RESPONSES
As filed on August 30, 2021, and revised on
February 11, 2022, the Certificate Holder’s EM&CP Part A
identifies and defines the Part A marshalling yard, including
construction access and protective measures for wetlands. The
standards for the EM&CP are described in the Joint Proposal and
its appendices.
DPS
With respect to EM&CP Part A, Staff provided informal
comments requesting additional information or clarifications,
including the need for the marshalling yard, installation of
erosion and sediment controls, whether culverts would be needed,
and clarification on other aspects pertaining to fencing and
guard structure installation. The Commission is advised that
the Certificate Holder adequately addressed all DPS Staff
comments in its February 11, 2022, revised EM&CP Part A.
NYS Thruway Authority
NYS Thruway Authority filed comments advising the
Certificate Holder that the Project will be subject to Authority
Occupancy and Work Permit Accommodation Guidelines. The
Certificate Holder states that the comments are unrelated to the
EM&CP Part A. DPS Staff concurs.
DISCUSSION AND CONCLUSION
As noted above, DPS Staff raised various concerns and
suggestions regarding details of the proposed EM&CP Part A. The
Certificate Holder submitted a revised EM&CP Part A containing
-4-
Page 55
CASE 18-T-0561
revised text and a revised Plan and Profile drawing sheet on
February 11, 2022, to reflect its revised request and addresses
the concerns raised by DPS Staff specific to that filing.
To avoid unnecessary costs that could result from
construction delays, it is appropriate for the Commission to
approve the use of the Eden-Evans Center Road marshalling yard
as Part A of the overall EM&CP at this time. Further, no
environmental impacts will occur as a result of using the site
and only minor improvements may be needed (e.g., spot fill or
fencing).
Based on the foregoing, the Commission finds that the
Certificate Holder has adequately addressed the informal
concerns raised by DPS Staff. Based on a review of all the
documents submitted, responses received, and supplemental
filings made by the Certificate Holder, the EM&CP Part A for the
Project is approved.
The Commission orders:
1. The revised Environmental Management and
Construction Plan Part A submitted by Niagara Mohawk Power
Corporation d/b/a National Grid on February 11, 2020, is
approved subject to the following condition.
2. The Certificate Holder shall not commence
construction until it has received a “Notice to Proceed with
Construction” letter sent by the Director of Facility
Certification and Compliance, or their designee, of the Office
of Electric, Gas and Water.
3. This proceeding is continued.
By the Commission,
(SIGNED) MICHELLE L. PHILLIPS
Secretary
-5-
Page 56
Public Service Commission
Rory M. Christian
Chair and
Chief Executive Officer
Diane X. Burman
Three Empire State Plaza, Albany, NY 12223-1350 James S. Alesi
www.dps.ny.gov Tracey A. Edwards
John B. Howard
David J. Valesky
John B. Maggiore
Commissioners
March 23, 2022
Via Electronic E-Mail:
Mr. Kevin M. Bernstein
Management Committee Chairman
Environmental and Energy Practice Group
Bond Schoeneck and King, PLLC
One Lincoln Center
Syracuse, New York 13202-1355
[email protected]
RE: CASE 18-T-0561 – Application of Niagara Mohawk Power Corporation d/b/a National
Grid for a Certificate of Environmental Compatibility and Public Need Pursuant to
Article VII for its Gardenville-Dunkirk Lines 141/142, Northern Section Rebuild Project
in Erie County
Notice to Proceed with Construction
Dear Mr. Bernstein:
The Application submitted by Niagara Mohawk Power Corporation d/b/a National Grid
(National Grid) to rebuild the 141/142 Transmission Lines was approved on February 11, 2019.
The Eden-Evans Center Road Marshalling Yard is a replacement for “Marshalling Yard 2” that
was approved in Exhibit 23 of Order adopting the Joint Proposal, issued on May 14, 2020. Part
A of The Environmental Management and Construction Plan, submitted by National Grid, was
approved by the New York State Public Service Commission on March 17, 2022. Ordering
Clause 2 of that March 17th Order stated:
“The Certificate Holder shall not commence construction until it has received a “Notice to
Proceed with Construction” letter sent by the Director of Facility Certification and Compliance
of the Office of Electric, Gas and Water….”
Staff of the Department of Public Service has determined that the information provided in
your letters on behalf of National Grid, dated March 22, 2022, sufficiently meets the
requirements of the Orders issued in the above referenced case.
Page 57
Kevin M. Bernstein
March 23, 2022, CASE 18-T-0561
On the date of March 23, 2022, you are hereby authorized to begin receiving materials at
the Eden-Evans Marshalling Yard. This Part A entails the installation of a temporary chain-link
fence, installation of erosion and sediment controls, and the storage of construction materials.
If you have any questions, please contact Lilly Schelling of the Environmental
Compliance Staff, at (518) 801-6038 or by email at [email protected].
Sincerely,
Jason Zehr
Chief, Environmental Certification and Compliance
Office of Electric, Gas and Water
cc: Case File, NYSDPS
Lilly Schelling, NYSDPS
-2-
Page 58
2. Rezone - 8175 Delamater Rd. Substation
Petitioner: National Grid
Page 59
Ari M. Goldberg
Counsel
October 19, 2026
VIA HAND DELIVERY
Town of Evans
Town Board
c/o William Smith, Director of Planning
8787 Erie Road
Angola, NY 14006
[email protected]
Re: Niagara Mohawk Power Corporation d/b/a National Grid
Delameter Road Substation | 8175 Delamater Road
Petition to Rezone from Rural Agriculture (R-A) to Light Industrial (LI)
Dear Supervisor Ashton and Honorable Members of the Town Board:
Barclay Damon LLP represents Niagara Mohawk Power Corporation d/b/a National Grid
(“National Grid”), record owner of 8175 Delamater Road, SBL 221.00-4-38 (“Property”), in the
Town. National Grid operates its Delameter Road Substation on the Property. National Grid
petitions the Town Board to rezone the Property from Rural Agriculture (R-A) to Light Industrial
(LI) and to amend the Official Zoning Map of the Town.
The rezoning supports the measured growth the Evans-Angola Comprehensive Plan
(“Plan”) envisions. The Plan directs growth to “key locations, especially where utilities exist, are
underutilized, or could be expanded with minimal effort.” Plan p. 38. The Plan also asks the Town
to ensure utilities are “positioned to support desired development in key areas.” Plan p. 51, Goal
#4. Rezoning lets National Grid upgrade the station on land it already uses, keeping service reliable
now, and ready for future growth of the Town and electrical demand the Plan invites.
The rezoning also brings the Property’s zoning in line with its long-standing use. The
substation has operated on the Property for decades, but the R-A District does not list public utility
stations among its permitted uses. The substation is therefore nonconforming. While no expansion
is proposed as part of this rezoning, under Zoning Law § 200-30.C(1), a nonconforming use may
not be “enlarged or increased,” and no structure devoted to that use, conforming or not, may be
“enlarged, extended, constructed, reconstructed or moved.”
Meanwhile, the LI District permits “public utility stations or exchanges” as of right. Zoning
Law § 200-24.B(1)(f). Rezoning to LI, would make the existing use conforming without
introducing a new use. And, under Zoning Law § 200-42, future site improvements would be
subject to site plan review.
The Avant Building - 200 Delaware Avenue Suite 1200 - Buffalo, New York 14202 barclaydamon.com
[email protected] Direct: (716) 858-3878 Fax: (716) 566-4040
Page 60
Delameter Road Substation | 8175 Delamater Road
Rezoning Petition
October 19, 2026
Page 2
Enclosed, please find the following:
Exhibit 1 – Application for Rezoning
Exhibit 2 – Zoning Law § 200-41.B Narrative
Exhibit 3 – Property Survey
Exhibit 4 – Tax Map
Exhibit 5 – Property Deed
Exhibit 6 – Environmental Assessment Form
Filing fee check of $800, payable to the Town of Evans
We look forward to discussing this rezoning with the Town. Please contact me with any questions.
Thank you for your consideration.
Very truly yours,
Ari M. Goldberg
Exhibits
cc (via email): Alexandra Kane, Town of Evans Planning and Development Associate
John Flading, Town of Evans Code Enforcement Officer
Brittany Penberthy, Town of Evans Town Attorney
National Grid
Page 61
Exhibit 1
Application for Rezoning
Page 62
Page 63
Page 64
Docusign Envelope ID: 95299353-00D9-8037-803E-3A167CDA7F87
James Zuccolotto, Director-Land Managment &
Authorized Signatory for National Grid
10/16/2026
Page 65
Exhibit 2
Zoning Law § 200-41.B Narrative
Page 66
Page 67
Zoning Law § 200-41.B
Rezoning Justification
Delameter Road Substation | 8175 Delamater Road
Rezone from Rural Agriculture (R-A) to Light Industrial (LI)
Town of Evans Zoning Law (“Zoning Law”) § 200-41.B sets out the information a petition for
rezoning must contain. The Applicant responses are listed below.
Zoning Law § 200-41.B(1) – Documents
(a) Name, address and telephone number of the applicant and, if he is not the owner, his
interest in the property.
Applicant Response: Niagara Mohawk Power Corporation d/b/a National Grid, 300
Erie Boulevard West, Syracuse, New York 13202.
(b) Name, address and telephone number of owner(s) of the property proposed for rezoning.
Applicant Response: National Grid owns the Property. Liber 8184 of Deeds at page
535. See Exhibit 4.
(c) A legal description and existing street address of the total site proposed for rezoning.
Applicant Response: 8175 Delamater Road, Angola, New York 14006, SBL
221.00-4-38. See Exhibit __ for a legal description.
(d) A survey of the total site, prepared by a licensed surveyor.
Applicant Response: See Exhibit 3, the Rezoning Map (prepared by Mark J.
Andrews, L.S.), showing the Property’s boundaries, existing structures and
improvements, rights-of-way, utilities, adjoining owners, and existing and
proposed zoning.
(e) Identification of existing and proposed zoning.
Applicant Response: See Exhibit 3. Request is from Rural Agriculture (R-A) to
Light Industrial (LI). The R-A District does not list public utility stations among its
permitted or specially permitted uses, so the substation is nonconforming. Zoning
Law §§ 200-8.2.B; 200-30.C(1). The LI District permits “public utility stations or
exchanges” as of right. Zoning Law § 200-24.B(1)(f). The Property exceeds the LI
minimum lot area of one acre and minimum lot width of 100 feet, with 7.217 acres
and 823.70 feet of lot width at the street. Zoning Law § 200-24.C(1), (2).
(f) A statement of planning objectives to be achieved by the rezoning. This statement should
include a description of the character of the proposed development, the rationale behind
1
Page 68
the assumptions and choices made by the applicant and a statement of how the development
meets the objectives of the Comprehensive Plan.
Applicant Response: The Evans-Angola Comprehensive Plan (“Plan”) envisions a
community that grows in measured steps. “[H]igh quality development will be
encouraged in strategic locations,” while “[a]griculture will continue to be supported
and preserved.” Plan p. 30. Each part of that vision depends on reliable electric service.
The rezoning lets the Town and National Grid work together to keep the electric system
ahead of the growth the Plan invites, on land already committed to utility use.
The rezoning introduces no new use. The Property holds National Grid’s Delameter
Road Substation. The substation adjoins an electric transmission corridor to the
southeast and is reached by existing gravel drives from Delamater Road. It generates
only periodic maintenance traffic and uses no public water or sewer service.
The rezoning will also accommodate future upgrades to the station. The engineering
and electrical design, scope, and timing of that work are not yet final. Any upgrade will
be subject to site plan review under Zoning Law § 200-42, the LI design regulations,
and the performance standards of Zoning Law § 200-26.
The rezoning meets several objectives of the Comprehensive Plan:
Infrastructure growth: The Plan directs the Town to “focus growth in key
locations, especially where utilities exist, are underutilized, or could be
expanded with minimal effort.” Plan p. 38. It asks the Town to “[i]dentify
opportunities for growth that take advantage of infrastructure and key
locations” and to “promote approaches to growth that better conserve
infrastructure, open space and natural resources.” Id. pp. 31, 33. The Property
is already dedicated to utility use and has an existing substation.
Infrastructure Reliability: The Plan recognizes the foundational importance of
infrastructure. It explains that water system improvements are “important to
continuing to provide safe and reliable water to existing users,” and it calls on
the Town to “consider the investment in infrastructure to foster economic
development.” Id. p. 34. The Plan also seeks a Town of Evans that attracts
young families, sustains itself as a year-round destination, revitalizes Main
Street, and draws new light industrial and commercial development. Id. pp. 32-
34. Those goals each add electric demand. The rezoning supports infrastructure
to enhance reliability to meet that growing demand.
Utility Partnerships: Town relies on utility partners like the Erie County Water
Authority, Erie County Sewer (District No. 2), and National Grid, who
“provides electric service throughout the Town and Village with two
transmission lines traversing the Town.” Id. p. 26. In calling for “a coordinated
effort” toward “a unified vision for the future,” the Plan directs the Town to
“[d]evelop a plan to extend utility services as needed to support development”
2
Page 69
and to “[e]nsure utilities are available/positioned to support desired
development in key areas.” Id. pp. 1, 51. National Grid funds, builds, and
maintains the station. The Town’s part is to zone the site so the station can grow
with the community, as outlined in the Plan, and to review any future upgrades
to the station and Property through site plan approval.
Preserve Agricultural Resources: The Plan seeks “[t]o preserve a viable
agricultural economy within the Town as well as the agricultural character it
brings.” Id. p. 33. While a R-A zoned property is changed to LI, the rezoning
takes no farmland out of production, because the Property has long been
devoted to utility use. It is limited to National Grid’s parcel and extends
industrial zoning to no neighboring property. The Plan describes light industrial
areas as “designed to fit inconspicuously with the surrounding land,” protected
by “[d]esign standards such as landscaping, buffering, and building design.” Id.
p. 46. Future site plan review applies those standards to any upgrade.
Maximize Tax Revenue without Community Burden: The Plan observes that
industrial uses “have a greater return to the community as opposed to residential
development” and are “better neighbors as they typically have interior
operations and have more limited hours compared to residential.” Id. pp. 38-39.
A substation has no on-site staff, no deliveries, and minimal traffic, and it places
almost no demand on Town services.
Zoning Alignment: The Plan recommends that the Town “[e]nsure an adequate
compatibility between neighboring uses through a review of the allowable uses
and extent of zoning districts.” Id. p. 51, Goal #3. Parcels to the east are zoned
LI , and this rezoning reasonably extends that LI district. Likewise, placing a
long-standing substation in the district designed for utility stations is an
appropriate using of the rezoning power. The Plan also asks that its goals be
“viewed as a whole,” so that “one goal shall not be pursued at the exclusion of
others.” Id. p. 32. This rezoning advances growth and infrastructure goals
without costing the community agricultural or rural character.
In addition to meeting Plan Goals, the rationale for rezoning is simple: the rezoning
to LI supports growth. The Zoning Law lists public utility stations in only one the
LI district. Zoning Law § 200-24.B(1)(f). LI is intended for “selective uses that do
not adversely impact the environment and quality of life of the residents and
property owners of the Town.” Zoning Law § 200-24.A. A substation, with no
manufacturing process and minimal traffic, that has been at this Property for
decades, fits that description.
A rezoning also serves the Town better than piecemeal relief within the R-A
District. It aligns the Zoning Map with an existing, permanent utility use. It lets the
Planning Board review any upgrade under the same site plan standards that govern
every industrial development. And it avoids the need for new relief each time the
station must be modified to meet demand.
3
Page 70
The rezoning advances the purposes of the Zoning Law, which include
“establish[ing] zoning patterns that ensure economic extensions for sewers, water
supply, waste disposal and other public utilities” and “bring[ing] about the gradual
conformity and continuity of land and building uses in accordance with the
objectives of the Comprehensive Plan.” Zoning Law § 200-2.J, K. Rezoning the
Property brings a nonconforming utility use into conformity and positions the
Town’s electric infrastructure to serve future growth.
The Plan stresses that zoning changes, “whether simply regulations and intent or
actual boundary changes, will need to be consistent with the Plan.” Plan p. 40. That
consistency is what separates a legitimate rezoning of a single parcel from spot
zoning, which singles out a small parcel “for a use classification totally different
from that of the surrounding area, for the benefit of the owner of such property and
to the detriment of other owners.” Rodgers v. Village of Tarrytown, 302 N.Y. 115,
123 (1951). This rezoning is not spot zoning. Parcels immediately east are zoned
LI, so the zoning designation exists in the immediate proximity. Moreover, the
rezoning recognizes a use that has existed on the Property for decades, carries out
express goals of the Plan, and benefits all users of electricity in the Town.
(g) A general statement as to how open space is to be owned and maintained, if relevant.
Applicant Response: The rezoning creates no common or dedicated open space.
National Grid will continue to own and maintain the entire Property, including the
areas outside the station fence.
(h) A development schedule indicating the approximate date when construction can be
expected to begin and be completed and any stages thereof.
Applicant Response: No construction is proposed as part of this rezoning.
(i) A statement of the applicant’s intentions with regard to the future selling or leasing of all
or portions of the proposed development.
Applicant Response: National Grid owns the Property. National Grid does not
intend to sell or lease the Property or any part of it.
(j) Quantitative data for the following: [1] Total number and type of dwelling units, indicating
distribution by dwelling unit type. [2] Calculation of the residential density and dwelling
units per gross acre for the entire development. [3] Total amount of open space. [4]
Proposed nonresidential floor area.
Applicant Response:
[1] Dwelling units None.
[2] Residential density Not applicable.
4
Page 71
[3] Open space None dedicated. See the response to (g).
[4] Nonresidential floor area Existing metal clad structure, approx. 14 x 35’
(k) A development plan, if required by the Planning Board, in order to assure that the proposed
zoning is consistent with the Comprehensive Plan and the intent and objectives of this
chapter.
Applicant Response: National Grid asks that the Planning Board accept the
Rezoning Map (Exhibit 3) as the development plan and waive the remaining items
in § 200-41.B(2). The Rezoning Map shows the Property’s boundaries, topography,
existing structures and utilities, adjoining owners, and existing and proposed
zoning. The rezoning introduces no new use. While the rezoning would
accommodate a future station upgrade, the engineering and electrical design, scope,
and timing of that work are not yet final. Any upgrade would require independent
site plan review under Zoning Law § 200-42.
In support of its waiver request, National Grid responds to each item required under
Zoning Law § 200-41.B(2):
(a) Existing site conditions Property lines, topography, drainage ditch, and culverts
are shown on Exhibit 3.
(b) Proposed land use No change. The Property will remain an electric
arrangement substation.
(c) Existing and proposed Existing station equipment, fencing, garage, and
structures; maximum heights transmission structures are shown on Exhibit 3.
(d) Use areas; lands conveyed, No land will be conveyed, dedicated, or reserved.
dedicated, or reserved
(e) Traffic circulation; parking; Access is by existing gravel drives from Delamater
ingress and egress Road. No new parking, loading, or stacking areas are
proposed.
(f) Pedestrian circulation The substation is a secured facility closed to the public.
(g) Existing utilities Existing underground and overhead electric lines, the
water main in Delamater Road, and storm culverts are
shown on Exhibit 3. The substation does not use public
water or sewer.
(h) Lands within 500 feet See Exhibit 5.
(i) Sketches of typical To be submitted with any site plan application.
structures
(j) Additional information Acknowledged.
5
Page 72
Exhibit 3
Property Survey
Page 73
6 5 4 3 2 1
A A
IRON PIPE
GREAT LOT LINE
LANDS NOW OR FORMERLY
MELANIE A. RUSHFORTH
B: 11360 ; P: 723
TAX PARCEL: 221.00-4-40 ATT: 713.80
ATT: 706.27
ATT: 722.78
TOWER LEG
ATT: 730.34
TOWER LEG
ATT: 722.38
ATT: 706.28
ATT: 714.36
H.L.C.S. LOT 38
IRON PIPE
ATT: 703.69 H.L.C.S. LOT 37
UP NG50 NYT64
ATT: 718.47
ATT: 716.53
ATT: 709.89
ATT: 716.77 IRON PIPE
ATT: 706.44
ATT: 724.25
LANDS NOW OR FORMERLY TOWER
B BD LAND AND ENERGY
B: 11312 ; P: 365 B
TAX PARCEL: 211.00-4-1.2
LANDS NOW OR FORMERLY
JOHN P. WELL
B: 11155 ; P: 9532
TAX PARCEL: 221.00-4-39
SAG: 716.58
SAG: 714.23 SAG: 715.52
SAG: 701.76
SAG: 705.22
GARAGE
IRON PIPE
IRON PIPE
UP NG49 VZ63 UP
ATT: 707.54
ATT: 701.45
ATT: 719.64 ATT: 714.29
ATT: 702.73
ATT: 720.29 ATT: 713.08
ATT: 720.65
DITCH
SAG: 725.79
SAG: 696.93
LANDS NOW OR FORMERLY SAG: 706.03
SAG: 707.94 SAG: 713.29
SAG: 716.37 SAG: 715.04 NIAGARA MOHAWK POWER CORPORATION SAG: 696.82
SAG: 716.07
B: 8184 ; P: 535
ATT: 721.92 SAG: 704.51
C UP NG48 1/2
ATT: 709.52
SAG: 697.10 ATT: 708.94
TAX PARCEL: 211.00-4-38
SAG: 713.81
C
SAG: 697.29 ATT: 722.12
CUL. INV. 677.23 ATT: 716.68
CP676 SPIKE
12" HDPE ATT: 724.38
ATT: 724.69 ATT: 716.64
ATT: 716.74 GUY POLE
SAG: 712.16
ATT: 724.93 SAG: 703.76 ATT: 706.54 ATT: 709.13
SAG: 703.30 ATT: 711.45
BOLLARD ATT: 703.97 SAG: 698.83 UP NG48B ATT: 709.14
ATT: 721.73 ATT: 716.64 ATT: 706.46
SAG: 709.55
CP3 MAG
SAG: 711.13
SAG: 711.69 SAG: 708.14
SAG: 710.12
SAG: 712.04 ATT: 706.35 SAG: 696.52
GATE
SAG: 712.23 ATT: 711.55 SAG: 703.77
ATT: 700.01 SAG: 708.62
SAG: 712.64 UP NG48A
ATT: 709.10 SAG: 708.20
SAG: 707.80 ATT: 711.76
GRAVEL DRIVE ATT: 708.48
SAG: 704.87 SAG: 703.17 ATT: 709.47
EDGE OF GRAVEL
ATT: 707.80
SAG: 703.04 ATT: 699.87
ATT: 708.20
BOLLARD SAG: 703.11 UP NG43C
SAG: 707.59 ATT: 701.10
SAG: 695.92 ATT: 708.69 ATT: 723.12
CUL. INV. 675.58 SAG: 694.74 UP
CP991 SPIKE ATT: 707.72 ATT: 715.14
ATT: 698.83 12" HDPE SAG: 707.88
ATT: 697.21 SAG: 707.49 ATT: 706.74
ATT: 712.36 ATT: 731.02
ATT: 712.79 ATT: 702.97 CP990 SPIKE ATT: 707.40 TOWER 230 LEG TOWER 230 LEG
ATT: 711.85 ATT: 694.04 ATT: 723.13
UP NG48 NYT62
SAG: 719.62 UP NG43A ATT: 706.68
SAG: 720.00 GRAVEL DRIVE
SAG: 720.41 ATT: 708.56 ATT: 707.42
ATT: 714.53
SAG: 706.81 ATT: 694.03
SAG: 702.39
SAG: 712.35 ATT: 712.50 ATT: 707.54 ATT: 696.37
SAG: 712.75 SAG: 707.86
SAG: 695.81 SAG: 707.26 ATT: 708.76 ATT: 703.50
SAG: 711.90 SAG: 708.08
SAG: 697.35 SAG: 699.34 ATT: 695.86 SAG: 704.59 ATT: 704.44 ATT: 695.55
SAG: 698.73
ATT: 708.72 SAG: 704.58 UP NG43B
ATT: 708.88 SAG: 707.78
ATT: 712.14 SAG: 691.08 ATT: 708.51
ATT: 714.00 SAG: 700.36 UP LI83 NG47H-2
ATT: 702.55 ATT: 711.14 SAG: 705.09 ATT: 698.75
SAG: 691.21 ATT: 695.93
ATT: 694.90 ATT: 701.57 ATT: 698.75
ATT: 695.74 UP
ATT: 712.84
ELEC. METER
UP NG47H
SAG: 696.98 CP673 SPIKE
ATT: 696.59
UP NG47H-1 SAG: 701.34
SAG: 711.25
ATT: 712.27 SAG: 701.18
SAG: 710.96 SAG: 701.49 CP992 SPIKE ATT: 714.42
SAG: 707.58
SAG: 711.03 ATT: 708.68 ATT: 712.97
CONC: 672.75 CL FENCE CONC: 672.76
ATT: 708.56 UP NM LI L856 NG43 1/2
UP ATT: 702.73 CONC: 672.82
SAG: 693.51 ATT: 710.38 ATT: 713.38
ATT: 702.73 SAG: 683.23
CL FENCE
ATT: 710.43 ATT: 710.31 PIPE
ATT: 708.64
ATT: 721.63 ATT: 683.34
ATT: 721.93 ATT: 722.62
GATE
SAG: 693.86 CONC: 672.50
CONC: 672.82 CONC: 672.42
SAG: 707.77
SAG: 698.26 SAG: 709.04 CONC: 672.44
SAG: 708.31 SAG: 712.84
D D
ON
GI
S CONC: 672.80
CONC: 672.80
CONC: 672.74
SAG: 713.51
SAG: 712.30
D
SE CONC: 672.82
BA CONC: 672.77
. CONC: 672.81
MM CONC: 672.82
CO CONC: 672.74
.
UG CONC: 672.74 CONC: 672.72
SAG: 717.58 OF CONC: 672.77
N
IO
UP NG47 NYT61 CT CONC: 672.82
ATT: 694.42 SE SAG: 701.99
ATT: 709.43 NE CONC: 672.76 CONC: 672.75
ATT: 693.07 SAG: 717.97
CONC: 672.78 CONC: 672.76
ATT: 699.51 TEL. PULLBOX SAG: 710.82
CONC: 672.72 CONC: 672.75
ATT: 709.22 SAG: 729.18
SAG: 716.98 ATT: 710.65 CONC: 672.80 SAG: 718.62 ATT: 713.87
CONC: 672.72
CONC: 672.72 CONC: 672.78 SAG: 702.50 UP LIL856 NM43
SAG: 716.62
DELAMATER ROAD (66' WIDE)
SAG: 709.93 ATT: 714.59
CONC: 672.73 CONC: 672.84 ATT: 713.19
CONC: 672.76 CONC: 672.77
CONC: 672.84 CONC: 672.72
SAG: 696.87 CONC: 672.75
SAG: 706.22 CONC: 672.69
EDGE OF GRAVEL
ATT: 701.56
ATT: 701.25 5
ATT: 701.10 7
ATT: 700.94 ATT: 701.26
P
ATT: 719.11 ATT: 701.17 :
ATT: 707.54 UP
ATT: 718.48 ATT: 718.29
;
ATT: 707.54 ATT: 707.58
1
4
5
SAG: 696.54 4 SAG: 711.85
SAG: 712.40
SAG: 695.81 B
: SAG: 711.32
SAG: 715.41 SAG: 695.06
9
SAG: 707.92 )
SAG: 713.36
( CP643 SPIKE
P
W W SAG: 708.12 A
SAG: 708.55 R
C
W
SAG: 708.17
E
SAG: 719.20 L
ATT: 722.08 SAG: 719.25
ATT: 713.54 SAG: 720.02 C
ATT: 694.23 SHARED
SAG: 697.70 O
M
ATT: 695.23 SHARED W ATT: 713.81 P UP NG231-20B
SAG: 689.44 A
ATT: 722.95
N ATT: 698.60
T
SAG: 693.93
SAG: 702.50
ATT: 707.78 Y UP NG231-20A
R
A
ATT: 707.18 C
K
SAG: 702.64 ATT: 701.03 SHARED P ATT: 698.55
UP NG46 O UP NG231-20 R
E
A
E ATT: 714.06
ATT: 722.19
ATT: 693.27
W
E
R
ATT: 698.79
SAG: 701.93
SAG: 711.96
I
L
R
O
A
D
UP 515 60 E
ATT: 725.39 SHARED R SAG: 709.46
CP2 SPIKE ATT: 717.46 SHARED I
SAG: 701.74
SAG: 694.44
ATT: 733.52 SHARED
E ATT: 713.84
SAG: 710.81 UP NMT42
SAG: 688.87 &
SAG: 717.03
SAG: 687.71 ATT: 714.51
SAG: 699.78
ATT: 692.93
SAG: 710.21 N TOWER 231 ATT: 713.38
ATT: 694.10 I
ATT: 710.38
SAG: 719.92
A ATT: 737.23 ATT: 721.40
ATT: 718.83
SAG: 710.15 G ATT: 716.81 SHARED
ATT: 731.01
SAG: 719.39 A ATT: 711.16
ATT: 710.32 R ATT: 732.66 SHARED
UP NG231-1 LI141
SAG: 713.69 A ATT: 725.35 SHARED
SAG: 700.46 ATT: 716.06 SAG: 721.74
ATT: 716.55 T SAG: 712.69
ATT: 718.91
UP NG46A
O
SAG: 730.52 CP588 SPIKE
ATT: 702.53 ATT: 718.55
C
ATT: 719.49
ATT: 710.29 O
N
ATT: 718.84 ATT: 716.30 V
E
SAG: 714.29 Y
SAG: 710.95 E
SAG: 713.62
SAG: 702.79
D
ATT: 701.38 SHARED
SAG: 694.18
L
SAG: 693.03
A
SAG: 711.02 N
SAG: 711.24 D
ATT: 712.85 S
ATT: 712.77
ATT: 705.64 T
H
ATT: 712.80 E
ATT: 694.56
UP NG45H VZ59
ATT: 693.47 O
F
L
I
N
E
N
O
R
T
H
SAG: 711.55 SAG: 711.38 W
E
SAG: 711.59 S
T
SAG: 692.86 SAG: 698.94 E
R
SAG: 693.81 L
SAG: 721.17 Y
SAG: 713.24
SAG: 703.16
SAG: 727.16
F SAG: 719.60
SAG: 703.90
F
SAG: 711.87
ATT: 711.96 UP
ATT: 712.46
ATT: 695.07
UP NG45
ATT: 693.96
ATT: 712.17
ATT: 699.91 SAG: 714.64
SAG: 705.73
SAG: 711.51
CP1 SPIKE CP573 MAG
LEGEND
- PROPERTY LINES ADJOINERS
ATT: 714.75 - HIGHWAY BOUNDARY (APPROXIMATE)
ATT: 706.65
ATT: 722.79
- FENCE LINE
TOWER
ATT: 726.71 ATT: 713.64
ATT: 706.67 ATT: 723.45 - U/G WATER MAIN
ATT: 722.77 TOWER 232
ATT: 714.70 ATT: 718.59 - U/G ELECTRIC LINE
- O/H ELECTRIC WIRE
- STORM SEWER
- CULVERT
NOTES
- CENTERLINE OF ROAD
G 1. UNDERGROUND UTILITIES SHOWN HEREON BASED ON UTILITY
EVIDENCE VISIBLE AT GROUND SURFACE AND RECORD DRAWINGS AND - EDGE OF PAVEMENT G
ARE SUBJECT TO FIELD VERIFICATION BY EXCAVATION. UTILITIES
- EDGE OF GRAVEL
SHOWN DO NOT PURPORT TO CONSTITUTE OR REPRESENT ALL
UTILITIES LOCATED UPON OR ADJACENT TO THE SURVEYED PREMISES. - EDGE OF CONCRETE
- BUILDING
2. THE OFFSETS OR DIMENSIONS SHOWN HEREON, FROM THE
PROPERTY LINES TO THE STRUCTURES, ARE FOR A SPECIFIC PURPOSE
- FOUND PIPE
AND USE; THEREFORE, THEY ARE NOT INTENDED TO MONUMENT THE
PROPERTY LINES OR TO GUIDE THE ERECTION OF FENCES, - FOUND REBAR
ADDITIONAL STRUCTURES, OR ANY OTHER IMPROVEMENTS.
- FOUND SPIKE
GRID NORTH
3. EASEMENTS AND/OR SUBSURFACE STRUCTURES RECORDED OR - EXISTING GUY
DATUM
U.S. SURVEY FEET UNRECORDED ARE NOT GUARANTEED UNLESS PHYSICALLY EVIDENT
NYSPCS WESTERN ZONE ON THE PREMISES AT THE TIME OF THE SURVEY. - EXISTING DISTROBUTION POLE
HORIZONTAL: NAD 83 (2011)
VERTICAL: NAVD 88 (GEOID 18)
- SIGN
4. SUBJECT TO ALL RIGHTS, EASEMENTS, COVENANTS, AND
RESTRICTIONS OF RECORD. - TRANSFORMER
0' 50' 100' 150' T
5. SUBJECT TO ANY STATE OF FACTS AND UP-TO-DATE ABSTRACT OF W W - WATER VALVE
HORIZONTAL SCALE: 1"=50' TITLE WOULD DISCLOSE.
- MISC. VALVE
H H
PREPARED BY
Engineering 08/06/2024
DES. APPROVED Design DELAMATER RD ORIGINAL
ISSUE DATE
Planning
Construction Management
DR. APPROVED
(716)633-4844 GPINET.COM DELAMATER SUBSTATION REBUILD FILE
INDEX
Greenman - Pedersen, Inc.
CK. APPROVED
4950 Genesee Street, Suite 100
Buffalo, NY, 14225
90000219682 DRAWING
NUMBER
SHEET
DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP.
APPROVED
ACCOUNT NUMBER SURVEY #5087
NUMBER
1 OF 1
6 5 4 3 2 1
5087-1.dgn 9/26/2024 10:46:23 AM
Page 74
Exhibit 4
Tax Map
Page 75
W
LAKE SHORE CENTRAL SCHOOL D
965.67 CL
1250.00 CL
800 CL
A( C )
EDEN CENTRAL SCHOOL
9 C
1250.00
NORTH EVANS FIRE DIST
A( C )
3
L
528
CL
557 170 24
L
15 43
9
312
DERBY FIRE PROTECTION DISTRICT
.47 CL 112 913.30 C
.78
9 35
( 291.8 41.2
4
528
4.85 A(C) (S ) 18
.1
880.75 CL
CL
(A
CL
LAKE SHORE CENTRAL 1.88 536. CL 621 FL L 4
1 A(
13.86 A
.06
412.63
14 18
SCHOOL DISTRICT NO. 1 10 363 CL
1432.86 CL
190 C .16
43
190
1
A (C )
20 1.3
CL 112.0
.55 .9
60(S)
1.88
12
68
2.86 A
47
150 CL
3.
5 5 2.9 A(C)
C)
1250.00 CL
500.67
CL 6
L
16 2.53A
75(S
6
0 5.58 A(C)
CL C
C
24
CL 112.0
CL 187.96 25 1 7
(S L
A )
1250.00 CL
214
) 0
10.2 71.2
.01
15
3.3 A(C) 3
35
10
(S ) 8 )
3. CL
40 12
6 11
363 CL
49.5
9(
52.12
0
90C L
8
100
C
2.
CL 2.0
CL
162 8
S L
!
(
.1 63
6 11
3 5 (S
246
2
5 25
WIDE
CL
EAS
1.6 CL
92
100(S
1
)
C 33
90C L
(S )
9.5 A(C)
CL
.1 8 373
2.0
18
324
12 6
50(S)
237 6
18
)
8. 37 .2
1112 150
)
.41
( S 13
5C L(
5. 42.1
T 702
CL
L
S)
0
.20
)
3.8 5.8 A(C)
23
(S)
44.21
132
5
S
871.20 C
43
2.5
412.39
5
L
7
DEP
97.07 CL 665.18 CL
CL
5(
2 .76
16
12.7 A(C) 7.80 A 14.62 A
L
548.32 CL
3. 5
23
C
1.0 A(C)
0
.14
41
214 CL
44.1
4.439 A
CL
OT
250 14.1 0
) 10
303.55
LAKE SHORE CENTRAL
36.1
4.364 A
(
.50
50
6 16.2 A(C)
(S S) 2.89 A(C)
0 11.2 A(C)
44.11
CL
338.41
220(S)
685.43
P
CL
4.289 A
3
S
0
T
.
7 298 CL 2
863
RT2 8
CL
72 4.9
800
O
872
FL 151
4.214 A
SCHOOL DISTRICT NO. 1
40
0 R
.28 314 (S )
4.137 A
1-B
78.74 A
10
(
6
.67
C
26 A
34
)
18
CL
2594.5
282.96
02 S
CL
5(
5.41 A
7.9A(C) 8.5A(C)
SCH 2817.9
13 ER 3
18
5
4
3
0 79.23 A(C) 45.75 A
EVANS WATER DISTRICT NO 5
15
S) 8. 1 CL
3.
17 0
23.9 A(C) 58.6 A(C)
558.11 CL
21.1 A(C)
13 0 0
400
O
17 A(C)
(S
2 A
AD
545.42
0 W 37
(S)
9.7 A(C) 6.80 A(C) 140.58
)
51
CL
¼ 49
5
0
CL CL
52.111
.00
SH5546
O
39
5(
40
20 43
39
P LR
6
14.1 41
CL
10.1
CL (S
18.42 A
0
CL
42 37.21
CL
)
7.87
AI
478 300
10 39 K R
250.37
246.04 210(S)
CL
08
235.71 .89C 13
AW
32.7 A(C)
17
) L
406
351.28 CL
S
203.78C
A
4
5. 5( TR R
351.28 CL
L 330.72C
R
L .50 25 CL 5 125.00
115
35
0 21 O 165
111213
10 22 H N
35
.58
0 E N
2.19 A(C) 2.10 A(C)
10 2
CL CL
C EN
1078.44 CL
2.68A(C) 409.2 80
9
.6
10 M
CL
L
CL
136.21
0
14 15
4.
170 CL
38
CL
37
P
170 CL
N
( 46
(S
)
50 C
360.96
CL
31
N 16
0
37.1
376.28 CL
157.7 4
37.22
200 CL 200.00
1.2
400 (S) L
N
N
38
E
285.00 CL 200 CL 212.21
10
16.2
1493
3 IA
(P TE
6
0
647
.5
10
R
5
G 56.1
12
0
221.26 579.18 CL
(DERBY-JERUSULEM CORNERS RD)
62 71.4 AR
311.76 CL
¼
6
.44
ES
32 653.40 CL .5
412.50
.2
20 A
DEPOT ST
90
19 60 CL CL 110 CL 115 CL
W
306.90
STURGEON POINT RD
73 90
.90 CL 423.06 CL TR
2
S)
559.02 272.17C
0 235.50(S) 177 159.06
466.9C
20
50 7
&
CL
853.38 CL
63
0(
855 FL(S)
28
159
381.31CL
L
20
159
76 .6
8
8 76
225(S)
L
8
LK 0
FL
25
963. 300 CL
36
1
2
CL
8.9 A 210.05 222.36
!
( 35.38 A(C)
65
316.73
31 1.
0 475.24 CL
FO
200 CL 200 CL 100 100 201.94C 187.44 150CL 150CL 139.92
65 CL
685.74 CL
FL 177
12
1.6 A(C)
(66' WIDE)
20 CL
33.1
R
L
8 18
494.7 5
47.3 47.2 293.46 CL(S) 30.1
(S)
1.
66
1.61A(C)
N
2.11
360 C
O
20 210 CL
0
CL
L 100( S)
60
283.38CL
165 CL
CL CL 13 A(C) 20.1 A(C)
321.84 CL(S)
635.9 2 C 346.50 CL
165 CL
CL
CL
679.07
(S)
.0
3
CL
239 CL 200 CL(S) 100
1.1
L 12 8( S)
30
7
)
1799.8 CL
383 CL
S
433.01 CL
383 CL
283 CL 191.36 CL
41.1
200 CL
1769.5 CL
14.2 14.1
0(
50
9
13.1
A
1739.3 CL
346.50 CL
10
612 .32 CL
(C 2.6 A 21.52 A
380 CL
CL
256.08
556.01 CL
59 0
1678.8 CL
1709 CL
11
250CL
825 CL
433.01 CL
CL( S)
255.5
130(S) 220(S ) FL
858 CL
433.01 CL
66
1607.53 CL
1.84 1.84
547.90
35
1648.5 CL
)
24
283 CL 3A(C)
3 4 12
10
27
462.00 CL 3.44 A(C)
47.12
10 0(S)
27.68 CL
50
7.
(49.5' WIDE)
9.9 A(C) 231.88
10 380 CL
A(C) A(C)
6 6
150
5.15 A(C)
426.01
16 3
26.12
6
625.68 CL
32
.0 2
2.97 A(C)
475 CL
CL
3.68 A(C)
435.
15
78
435. 1.63 A 21 7 CL 300 C
63 .6
340.98
336.31 CL
8
647.89 CL
10 0
650.66 CL
L( S)
425.00 CL
!
(
FL L
1.74 A
9
3.3 A(C) 572 C
C
66 721
644.10 CL
100
C .57 200.0 78
F
(6 6
5.
187.06
28
L
4.6
640.2 C 26.2
.
41
L
0
' W 72 C L
2
5.2 A(C)
31.1 425.00
L
6.47 A(C)
96 51
174.65
200
4 20
200
.5
35 2
CL1
CL
ID E 300
00
EVA DUL 2
54
22.11 33
TR
900 CL 900 CL
3 FL
CL
914 CL
2.02 A(C) 914 CL
26
5
)
1.
. 198 CL
17 9
1135.86 FL
42 7 5 .0
5
4.51 A 187 CL
.6 0
2.54
156.82
8( 400 6.87A(C) CL 4.59 A(C)
CL
53
9
591.2 923.80 583.30 116 759.66 801.24 CL 200 174.65
44.11
S)
L
50
N 975,692
10.38 A(C)
A(C) 78 100 136.67 475
11.1
AI 14 9
23
CL .9 0
379 5.1 A
3.21
.50
R
829.05 CL CL(
CL
1068.13 CL
7F
31
597 5.5 A(C)
E)
172 580
N
617 2.71A
6
S) CL
2
L
CL(
10.61 A
281.32 CL 281.32 CL 100CL 181.32 CL 259.35CL 259.35CL
5.5 A(C)
E 396,671
S C S
535.9 2 CL
26.11
102 )
4.
600 CL
O W
4.9 A(C)
270.08
590.34 CL
N 976000 N 976000 N 976000
ID
17
.18
16
2.02 A(C)
23 S)
16.12
274
66.7 362 263.72
600 CL
462.00 CL
349.31 .5 80
L
737.16 590 CL
2.90 A(C)
0( 210.02 288.94 CL 9 C
3.22
49
.6
9F
FL(49.5' WIDE)
L 8 C
( 1529.14 CL
22.23
2.73
0'
820.38 CL
337.0 CL
30
FL
1 33.15 A 1 245 C 1 L
919.28 FL
395.85
125.45 FL
897.6 FL
981 FL(S)
65
28
0
FL 2.3 F
L
ER I
200F
(S
E
)
RD
20
L
23
9
.8
9
90
28.11.3A(C)
13.5 A(C)
27
29
508.71
298.65
1.1A(C)
37 5
.
65
63
189.37
22753.52
E 1032000
37.2 A(C)
30
216.2
( 108.5
108.52
2457.25 CL
108.52
108.5 108.5 144.54
15.2 A(C)
19.12
259.35
828.56 CL
828.07 CL
19.11
4.8 A(C)
16.11 575.00 CL 6.10 A
44.12
575.00
1966.47
23.6 A(C)
2.12
2192.79 CL
2198.24 CL
39.82 A(C)
47.11 2 100 100
200
E 1038000 2164.14C
L (S)
18.44 A
150
1364.14
248.5
103
281.38
1.93A(C)
848.27 CL(S) 4.83 A
845.13 CL
845.13 CL
695.80
17
15
16
100
150
CL
TR288
248.5 CL
100CL 103CL
L
245 C
L
2.90 A(C)
22.22
535.9 2 C
L
SL 3
SL 2
245
245
16.20 A(C)
15.1 A(C)
25
29
85
8
8
.2
42
10
.5
(5
8 450.02
2.11
208.46
158.46 50
2.5
A(C)
32.1 A(C)
3.11
410
(S )
617
.14
200
.00
788.40C
L
9.95 A(C)
6.111
2 529 CL(S)
1.4A(C)
344.9 CL
42
263 CL
3.3 A(C)
43.1
E 1044000
624.23 CL
261.87 CL
623.3C
L
150
103.34 CL
44.1
.0 C
L
1.95A(C)
585.93C
L
44.21
249
2.71A(C)
.2
W
C
L
495 C
5221.2C
125
CL
L
1.2 A(C)
300
C
L
3.12 A(C)
569
267
48
U
.73
.36
2.6 A(C)
CL 2
67.
73
CL
CL
2.6 A(C)
CL
333
49
.5 0
157
CL
30.2
300
CL
187
100
.2 1 CL
83.
57
407.02 CL 28.1
A(C)
269.04
CL
214.38
50
214.38 CL
488.5 CL 1.3 A(C) 285.76
26
104.18 CL
462.00 CL 5 A(C) 150 CL 5.03 A .20
9 L 47
2879.92
272.1
278.02C 57
3
18
18.
L
224.75 CL
4.85 A(C) 286 .6 CL 66
DECKER RD
68.20 2884.60 15.53 A(C) CL
278
9
6.112
1.2 A(C)
C L 80.40 CL
495 CL
144.54
11.2 A(C) 235.46
200
206.20
181.38
5.02 A
1781.14
100
843.40 CL
153.20 6.1
2230.68 CL
1728.23
201.10 CL 224.47 CL
2.9 A(C) 788.72 300
26 787.54C 1.5A(C) 80.66 386.41 CL
1657.58
F
26.20
L ILLES RD
L
25 56.11
6
2.9 A(C)
0
4.2 A(C)
267
0
174.15 155.25
179.47
CL
VERSA
20
2105.52
25
917.28 .73
19 D 4
F2L
39
15.58 A
CL
863
SL 1
(
51 0
36.5 A(C)
.
842.09 CL 27 28 .57 267
272.1 21 372.57
3022.8
630.65
51
11.00 A(C) 4.85 A(C) .73 7.44 A
1.11
363.66 CL
1250.14 1287.67
DELAMATER RD
278C
6.113
1261.14
52
205.92 3.4 A(C) 278 L
R
10.24 A 1.65 A
694.92C
200 CL 174.15 155.25
1084.98 C
22.21
100
193.10
20 64 L
2453.62 CL
L
29
44.2
(
N
963.53 CL
1127.56 1122.92
7. E 786.68C 200
09
SCH
838.12 CL L
3 A
966.47
K
1015 CL
EE 780.87 CL
1202.6 CL
15.58 A
11.2
363.75 CL
EVANS WATER
54
(
3.73 A(C) 1.96 A(C)
278.00 CL
54.9 A
272.1 A 22
5.0 A
50.1
204
21.2
200
24 737.88
( 278.02 6.13
.07
1103.1 CL
350.13 CL
¼SH5546 2451.81 CL
2451.31 CL 50 CL
635 635 836.50 CL 12.1 A(C)
1.21 1.22
782.69 CL
29.90 A(C)
63
341.20 CL
DISTRICT NO 1
14.40 A(C) 1.01 A(C) 244.75 6.23 A(C)
0
200 CL 341.20 494.14
363.73 CL
.9
272.1
CL 5.0 A
23.1 23.2 21.1
60
278 CL
EVANS WATER DISTRICT NO 1
1791.12
363.70 CL
200
5
6.21
)
CL
EVANS WATER DISTRICT NO 1
S
278 1.5 A(C)
200 CL
0(
65
3622.08 TO FL
FL W
244.75
FL 200.0
834 CL(S)
W FL
2450 CL
FL WL
F
57
31.32 CL 462.00 CL 627 210.00 875.04
FL 401.94
W
485.28 205.92 802.56 CL
FL FL W FL
927.30
FL W
784.50 CL
FL FL FL
1020.34
306.24
199.75 SW COR
199.71 398.85
730 252.13 199.75 390.51
FL 629.85 298.13 328.71 CL 363.70 CL 392.19
49.50
2.12 A
EVANS WATER DISTRICT NO 5
365(S) 22(S)
L3985 P177 ISAAC BARTHOLOMEW
1
2 1066.3 107.5 1788.6 130.45 C
L 295.09 287.92 287.92 1128 C 755 C 1030.87 49.5 155.14
146.52
EVANS WD NO 5 F
L 327.7
L
EVANS WATER DISTRICT NO 5 19.2
L6308 P551
5.05 A(C)
.4 3
0
73.85
200 C
1360.05
0 20
1642.03
)
7
L3985 P177
L
6. 2 200
28 1 C
49.5
2.12 A 20
1234.2
2 0 A(
3
A(
13.77 A(C)
318 C
2
268.50
0
135 134.16 389.4
A( C)
L
1127.40 C
0.
7.93 A(C) 295.09
2.33 A
L
1075.15 17
31
3.5 A(C)
1
C
.3 40
41.1
51.2 452.83
13.2 )
200
0
100 100 100 7. 20
(50' WIDE)
22 20
93.61 0
1.0 A 1127.27 CL
5.3 A(C)
25(S) 2.12 A
295.09
(
3
21 20 19 18 135
4 23.50 A 2120.58 C
19.12
1 (
139.10
L3985 P177
L
3.07A(C)
40
26.5 A(C) 9.17 A(C)
1.51 A(C)
365 CL
S
1320.47 CL
391
1246.49 CL
328.61
)
FL
19.112
2071.08
911.31 43 821.04
1313.8 CL
C
1320.4 CL
9.112
135 365
0
1025(S)
2.12 A A( 20
235 235 4
1323 CL
135
5 49.5
45.1 44
( 420.64 CL
43 42 41.2 940 940 940
.4
688.73
821.0
20 A
3.6 A(C)
1172.52 CL
12
200 730
DERBY FIRE PROTECTION DISTRICT 15
45 2 8 1.1A(C)
100 100
1126.54 CL
1.81 A(C)
30
100 139.10
F
389.4
(50' WIDE) 6.1 100
389.4 FL
35
5
4. 7
F
130
5.57A(C)
F
SCH
7(
36
100
19.111
1128 CL
100 100 239.10 529.99
30
TR S
36 37 39.1 168 200 EVANS CENTER FIRE PROTECTION DISTRICT )
1313(S)
168 168 L6308 P551 2.71 A(C)
11 10 9 6 170
8 7 L3985 P177
7.1
1204.94 CL
365 CL
9.15 A(C) 2071.08
1215.70 CL 1224.00 CL
1.12
55.44CL
1232.31 CL 1261.92
L6308 P551 L3985 P177
140
58
100
(
100
365
391
8.1
239.10
386.15(S)
729.99
N 133.85 768.19
5.93 A(C)
1066.23C
200 123
N OR
150 L
400 165 123
2044.02 CL
145
L3985 P177
L3985 P177 E F 973(S)
O
R FO
B C
671.22 CL
D
170.12
31.74 A(C) 1663.20
1.61 A(C)
1.46 A(C)
21
170.12
18.2 A(C)
180CL 100 100 189.38
100 100 189.38
190 9.11 6.2 A(C) 50 1066.3 FO L K
CATHERINE ST
448.34 C
523.28( S) CL
2.9 A(C)
12.1 A(C)
2028.66 CL 2028.40 CL
1.11
107.5 2.81 A(C)
394.87 CL
2.111
LK 1128 CL
L
16.21
L 448.34 C
18
300
8.49 A(C) &
C
48
445.6 CL
L 2.12
(
396 CL 396 CL
445.6 CL 445.6 CL
120
1064.4
200 180
445.6 CL
90
671.50 CL 26.4 A(C)
51.111
& W 1122.07 CL
8
300 CL
16.1
W ES
204.87 CL
2.2
.6
204.87 CL 10.13
17 29
1.7 A(C)
1.5 A 1.5 A
18.1
7.085 A 39
1151.04 CL ES TE 1.48 A(C)
200 200 200 200 200 5.594 A
11 12 13.11
38 CL CL
5.632 A
8.1 9.21 13.12
1.19 A(C)1.19 A(C)
1.2
(
13.13 TE R N
CL
1.40 A(C) 25
14.1 14.2
945.78 CL
54 10.25 A(C)
16
10
R
200 CL 200 CL
CL 671.55 CL 365
200 CL
514.37 (S)
120 180
BACKUS RD (49. 380.77
90 165 CL
N
165 CL
R
L3985 P177 258.80 CL
22.21
(49.5' WIDE) 34.0 CL L
200 CL
250.0 C R AI L
L3985 P177
1.54 A
200 CL
150 C
123 CL
5' WIDE)
123 CL
963.74( S)
MC 2416
L 45 A(C)
588.73
100 145 CL
AI R
100
CL
200
TR285
233.7
LAKE SHORE CENTRAL SCHOOL DISTRICT
100
630.77
207.04 10
3
100 100
0 200 CL 249.9
100 100
200 CL 200 CL
7.1
LR O 671.66 CL
BACKUS 34
60 61 62.1
280.59
F
3CL 200 CL 100 100.0C 400 CL E
RD 49.5 WID L O AD
15
64.1 66 67 68 69 CL 1.7A(C)
FL
219.41
SCH
L100.0C
L 9.39 A
CL 13 A
200 CL AD 2.67 A(C)
370 .09 C 13.4 A(C)
180
821.61
200
150 60 267.70
60
CL L
250 C CL
30
11 10
11
CL 200 CL 100 200
9
414.20 CL
8 250 250 250
10
250
12
250 250 280CL
1 CL L 1.8A(C) 671.88 CL 784.57 1796.10 49.5
CL CL 189.55 250 C 2.2 A(C)
790.0
250
8
250
400 CL 400 CL
1090.0 CL
475.96 CL
400 CL 148.16
1178.76
11.31
7 6
F 24.12 A(C) 110
110
100 100 5
319.7 CL
200
4 3 2
414.2CL
400 CL
1178.76
200CL
CL
9.1 46
360.0 CL
1.69A(C)
9.2 EDEN CENTRAL SCHOOL DISTRICT
CL
DERB
319.7 CL
100 CL 18.3 A(C) 20CL
414.20 CL
400 .0C
4 42 28 18.34 A(C)
6.09 A(C)
300CL
209.76
1.69A(C)
300CL
414.20 CL
NORTH EVANS FIRE DISTRICT
Y FIRE PROTECTION DISTRICT
3.66 A 335.94 CL
233.7 100 100 100
L
100
11.32 8.2
280 CL
3
319.7 CL
8.36 A(C)
943.47 MC 2416 5.87 A
6.1 6.3 8.1
2.0 A(C)
45.1
TR288 408.60
28
504.3
7.1 9.1
6.2
(
305.70
CL
609.38 27.1
100 184.28 400.0C
L
298.6
200 250 4.55 A
589.38 CL
799 .06 C
100 119.60 100 5.7 A(C) 266.12
1000 CL
250
9.54 A
800 C
150
14
L
45 A
L
284.28 233.88
800.0 CL
10.2 LITTLE SI
.0
800.0 CL
12
319.60 500 200 355
589.38
(66' WIDE)
715.07 718.16
60.0
STER 700 CL .2 347.49
334.23 CL
1.83 A
CREEK
10
350.7
500 CL
FL
500 CL
5.91 A(C)
384.75 CL
32
376.2 CL
800.0 CL
376.2 CL
4.54 A(C)
376.2 CL
0
12.886 A 2076.29 CL
499.06 256.20
FL 570 570
47 39.1 26
5.58 A(C) 3 A 4.47 A 4.84 A(C)
C
439.06
.8
35.1 32 31 13
51
33
210
363.66 CL L
4.0 A(C)
433.9 CL
4
1250 CL
41 210 CL
1250 CL
210 CL
20.83 A(C)
695.64 CL CL 22.112 439.4
11.13 A(C)
27.2
1.47A
1
30 A(C) 941.04 CL 504.3 CL 225 CL 444.06 83.16 100(S) 220(S) 80 70 344.85 CL 347.49 CL 517.77 CL 336.27 336.27 1663.20
26 A(C) 210 CL 287.92 CL 287.92 CL
1050 TR286 BURNS RD 781.97
1325.75
331 .24 305.70
11.1 11.2
366.55
200 100 49.5 WIDE TR286
3
150.25 100 200 480.48C
12
244.86 CL 100 200 CL 215
58
200 CL 251.15 160 CL 200 CL 130CL 231.50 L 396 C
235 CL 190 CL(S) 100(S) 220(S)
5 1.03A(C)
349.94 CL 80 70 631.72 CL
75 CL
291.1CL 85 200 C L
323 CL
(
L
125 CL 125 CL 160 CL 100
231 CL 293.50 CL 287.92 CL
24 25
83.2 A(C) 666.55 CL
1.78 A(C) 165.40 CL
10.1
1.1 A(C) 1906.08
18
CL CL 21 375 CL 375 CL
S)
331.19 CL
3. CL 371.03 CL
250 CL 6.1
1.45 A 268 C
11
L(
21
200 200 30
250 CL
31 L
C
122.15
75
3
1908.65
2 11.5
200 200
29
264.5 CL
725.77 CL
3
5.71 A(C)
200 132
3
100 7.79 A(C)
131.60
435.6 1.1 A(C)
1518.81
CL
160 200 130 10
4.1 A 24.1
FL 8.82 A(C)
.6
7.5 A(C) 215 8.81 A(C) 7.89 A(C)
13
490
816.46 CL 6.40 A(C)
1
1516.81
23
S
435.6 24 22.12
30 A
4.2
255.5
84.5 A(C) 9.6 A(C) 12 A 11.71 A 125
9
1
(
34.3 A(C)
887.24 CL(S)
36
10.111 4.1 5 6 7 8 276.3
2572.29 CL
12.07 A
N 972000 47.5 A
200 275.96
100 8.6 A(C) 9.84 A(C) 2.21 2.11 4
556.94 CL
5 19
1049.08 CL
351.20 CL
1048.44 CL
18.6 A
1177.82 CL 1047 CL(S)
22.1 26
1047.8 CL
20.6 A(C)
1
284.91
816.42
531.31
2193.14
2 E 1032000
2152.40
475.96
( 48
342
10.112
500 CL
3.73 A(C)
342 CL
200 CL
42
1.1
1473.78 CL
927.82
11
12
.0
5
32.73 A
17
1791.45
1268.22C
DERBY FIRE PROTECTION DISTRICT
1268.52 C
L
L
1268.52 C
L
7.1 A(C)
1783.20 1783.2M CL
1772.0 CL 1772.0 CL
SCH
385.64 CL
556.94 CL
8.9 A(C)
23
1460.57
1015.39
6.0 A(C)
B
LV
D
00
F
55
11.1 A(C)
0
14
DELAMATER RD
22.21 22.11
1698.21 457.20
1746
00 N
F
116
F
1813.02C
F F
951.04
F
TE
L
F F
200 CL
5.
500 CL 45.32 FL
462.95
73 R
5
1811.7
1593.22
ES
1592.43
415
EVANS CENTER FIRE PROTECTION DISTRICT 375 375 366.74 CL
846.0
1518.0 1527.92
11.75 W
1811.7 CL
1593 1116.74 CL 1000 CL 432.18 89
TH 0
583.29
(
.4
591 CL 1158.98
1432.18 CL
89
521.75 13 U 00
1067.22 150 200 CL
549.92 9.08 A(C) 6.1 A(C) 6.96 A
365 CL
23.91 A 14 200 CL SO 11
21 1164.27 CL
75
45
VERSAILLES RD
1.2
21
9.2 15
1810(S)
365
21 5
799.92
8. ) 5
.5
C
798 CL CL
38 A( 45 .8
46
9
85 .6
17 0
3.5 A(C)
)
1.4 A(C)
C
12 A
3
FL 1115.41 CL
15 20
805
19
140 C
805
1813.82 CL 1810.46 CL
7. A(
16
L 140 C
541.50
FL
116 CL
5 717.7
.5
521.65
4. .9
268.6
200 C
L 15
544.5
9 A 552.00 680.53
41
15.36 A(C) A ( (C
L
365(S)
9.07 A(C)
365 CL
C )
14.121
140
) 4.2 A(C) 3.97 A(C) 6.15 A
9.12 315.48 315.48
88
18 315.48
68
16
)
40 17
(S
EVANS WATER DIST NO 5
7.
LAKE SHORE CENTRAL SCHOOL DISTRICT
7.
68
420
64
FL W FL140 FL 150 FL
40
542.14 500 1146.42
FL
331.37
140
2055.21 CL
7.
SCH FL FL FL
1114.88 CL 552.00
FL FL
SCH 664.62 FL
250.25 200 477.53 291.67 191.33 100 287.92 416.44 361.57
SCH
1280.4
40
SCH1401.68
329.74 230 132.06 88
280 200 365 200 200 314.62 346.62 263.60 262.68 536.58 C
L
EVANS WATER DIST NO 4 39
1869.02
1.54 A(C)
140 C
1496.20 817.50 CL 1117.38 1235(S)
736.85 C
20 C
21.22 2.4 A(C)
L L
140
14.75 A
L 1.9 A(C) 1.5 A(C) 1.7 A(C)
12.8 A(C) FL
200 C
L
EVANS CENTRAL SCHOOL DISTRICT
!
( 41
1 125(S) CL
2.2 A(C) 765 CL
14.4 750 CL
16 S
730.60 CL
13.11
712.25 CL
706.2 CL
11.4 A(C)
704.22 CL
712.25 CL
760.0 CL
734.50 CL
20
740.88 CL 730.30 CL 3.07 A(C) 722.68 CL 714 CL(S) 710.35 CL708.50 CL 708.50 CL
23.11 225.40 CL
807.06 CL 736.39 CL 738.47 CL
3.26 A(C)
728 CL
4.29 A(C)
668.32 668.32
115
2
781.22 CL
781.22 CL
.3
11.7 A(C) 7.186 A 40
14.22 740(S)
6.6 A(C)
14.11
11 )
6.5 A
856.89 CL
(S
871.62 CL
378.80 CL
17.22
2.02A 4.3 A(C) 5.85 A(C) 3.35 A 4.14 A(C) 7.98 A(C)
378.80 CL
38
40
5.4 A(C) 4.26 A
14.3 14.21 13 20.1 21.21 19.2
5.0 A(C)
17.1 16 14.5 19.1 1817 13.12 12 11.11
11
SCH
FL
153.75 CL
112
303.98
285 CL 200 CL 112.2 280 CL
CL
140 200 C 354.07 CL 200 CL 200 313.91 CL
CL
150 346.62 CL 477.96 CL(S)
153.75 CL 15 1.85 A
244.36 292.02
243.21CL(S) 132 CL L
L
CHURCH RD TR289
C
536.58 C
CHURCH RD
118 CL 100 CL 100 CL 112 CL 197.70 CL(S) 115 263.60 C 262.68 CL
47
L L
49.5 WIDE
.9
49.5 WIDE
54
4
CL
59.61
0 203.26 200 CL 136.62 131 C
L 100
150CL185 CL 100 149CL 200 CL 349 CL 234 CL 429.91 CL 200 CL 115 175CL 174CL 465.64 CL(S) N C
N OR
.1 .7 CL
EN
33
100CL 150 CL 300 100 50 143.99 CL 141.4
300
513.91 CL(S)
272
10 11
10 4 C C
L L CL
CL
CL(S)
)
27.1
CL
CL
14
O FO TR
330 CL(S)
(S
1.72 A(C) 185 CL
185 CL
1565.41
9.11
12 0
6 7
50
23.2
R
21.111
183 CL 218 CL 4 A(C)
CL
275 CL 275 CL FO L K AL 737.88 18
3.84 A(C)
2 A
28.1
12 0
300 C
5.05 A(C)
275 CL
1452
300 C
0(S
2.5 A(C)
300 C L
3.5 A(C)
35
L L 383.0 CL
)
828 558.00 CL FL
32
LK &
141.4
300 C R 30 )16
365 CL
5.2 500 CL 500 CL 500 CL
L
1.72 A
9.3 A(C) 4.4A(C) AI
12
0 50
(S 5(S
4.9A(C)
)
& W LR
1.63A(C)15.2
CL 57(S)
L 251.68CL
2.74 A(C)
22.1 23
5.7 A
150
1.08A(C)
10 A
300 150(S)
200.0
0
E 250(S)
3
12
22.2
O
136.62 100
31 34
W ST
597.85 200 200
AD
16 17
)
90 18.5 A(C) ES E 2.62 A(C)
S) (S
5 6.09 A(C) )
L( 27
90
TE R N
0
24 49 25 26.11
C
697.14
9.121 30
141.4
R
60
500 CL
942.14 CL 951.95 CL
ERIE COUNTY SEWER DISTRICT NO 2
N R
9.11
936.8 CL
619.15 CL
1.8 A(C)
36.1
54.72 A(C)
1089 CL
R AI L
(
FL
1089 CL
100 149 2 A(C) 21
AI R O
9.12
L
19 8( S) 3
26.12
C
LR A
37
2
7.4 21
N
961.5 CL
150 249
961.5 CL
1248.06 CL 1248.06 CL 1248.06 CL
22
.5
4
100 1 5
O D 100 A
10 70 EN
.2
35
5.
624
C
AD
185(S) 0 1
L 57
12.05 A(C) 7
2757.01
(P
159.58
247.58 CL
624 21 C 84.94 A(C)
13.1 36.2
5
(A
L
C
C
1636.80 CL
18.1
20.98 A L 10
0
1636.8 CL
20.81 A(C)
1095.60 CL
E)
8 3.1 A(C) W
L
748.06 38.1
C
748.06
ID 373.40 CL 383.55
30
S) L
0 L( C
367.62
234.24 430.38
C ' 3
350 CL
00
3 A
175 .6
67
1620.13 287.50
4
75
350
(1
( 22
3.
3709.75
0 0 91 10
200
20 20
47
1.00 A(C)
¼ SH9269
17
( 692.14
(
287.50
40
( 37
(
S
373.40 CL
(3935.58 CL)
584 200.0 349
3940.86 CL
FL FL
27
8.57 A
646.80
W
(A
64.25 A
766.00
32.6 A(C)
41.2
( A
2
A(
C
)
42
CL
2469.5
3142.92 CL
2575.57
3140.94 CL
3188.46 CL
FL ( 218
21
215.8
1.3 A(C)
10
165.71
348
28
0
35
0(
S)
142.80 CL
775.68
14.75 A(C)
23.12
1585.76 CL
350 CL
125
CL
1.87 A(C)
20
21
690.16 CL
125.61
3142.92
8 6.
3982.3 CL
.8 238.8
4
59.5 A(C) 315.00
63 33 678.30 CL
60.6 A(C)
429.47
44
0.
45
0
43 A(C)
16 ) 9 25
22.1
170.80
3. 4
20
!
27 (
(S
EVANS WATER DISTRICT NO 4 EVANS WATER DISTRICT NO 5
21
6 A(
SCH 41
3264.36 CL
2377 LC(S)
50
2340.36 C
4.
(
A( C)
L
60
(
.7
50
34 D
368.80 13 C 92 4
)
4. LV 4.
2377 C(S) 2340.36 C
237.9 A(C)
6.
L L
B 17
N 968000 N 968000
36
48.07 A(C) 46
2379.27
2 N
5
.1
31.1
TE 5 A
1 1
W
FL
2 ( 47 E 1032000 2361.45 CL
N
O
532.10
N
O
R
R OL
F
FO K
LK &
31
20
B
(
52.7 A(C)
36
53.4 A
35
43.1 A(C) 115
FL
60 A
23
54
.4
9 SO
U
TH
21
W
26
1.
ES
38
3
16.113
R
17.1
40
264.6
2.5 A(C)
6.
308.3
787.9
19
783.7
7.75 A
11
400
556.38 CL
4.80 A(C)
24.21
400C
L
2 1534.6 CL
E 1044000
60 A
48.3 A(C)
19
TI O
N
)
+ 90
powered by Landmax Data Systems April 2025
12
.9
& W 33.1 4
57 1
C
( 2.0 A(C)
4
930(S)
W ES T 556.38 CL
82
(A 428 196.09 SE
6
ES E 20
50
2.80 A(C)
808.78 CL 808.78 CL
TE R N
207.8
129 299 10 A(C)
16.12
514.42 CL
R 278.19 6.18 A(C)
L
17
IE
24.1
C
N RA 54.6 A(C)
R I LR 422
514.42
556.38 (E 866.5
516.71
05
AI
41.1
250 R
2.06 A
LR O A
A
532
12
S
396
( S 2.187 A
81
O D
S
49.8 A(C)
20.1
.8
S
7 A(C)
S
3
AD
22.1
49 A(C)
696 CL 16.112
612.89 CL
FL
18.1 25
606.76 CL
19.79 A(C) 1.19 A(C) 250
606.76 CL
200 FL
34
1.4 A(C)
EVA CAR-1 L
L
21 33.2 500 CL
ERIE COUNTY SEWER DISTRICT NO 2 500 C
AI
28.2
!
( 612.89 CL
125 556.38 CL
18.2
R 0
608.35 7.3 A(C)
N966,666
50
477
208.71
S) N
200
300 CL
CL
26
208.71
300 CL
O
217.8CL EVANS CENTER FIRE PROTECTION DISTRICT 9
12.1
0(
498.3
5.55 A(C)
340
248.71 2 A(C)
C
1.7 A(C) 170 90
208.7 CL 250 CL
3.36 A
250 CL
E384,941 208.71
37 265 CL
30.1
18
217.8CL 16.111 15
.5
406.55 CL
170
245 CL
170
16.2
CL
18.2 245 CL 245 CL 25
125
24
245CL
!
( 248.71CL
CL
6
CL
28
265
14 556.38 CL
CL CL
16 15
CL
32
78
1050.06 CL 367.62 C CL
790 CL
!
( 220(S) 80 90 607.32 119 .5
4 80 .7 998.14 616.29 CL(S) 400 CL 129 200 CL 657 CL 315.88 CL
CL 233 CL 233 CL
8
L 555.06 CL 422 CL 484.20 CL 115 374.30CL 125 996.08 CL
32
.9 9 208.17 CL (664.62 CL)
125
200CL
F
208.71CL 146.35 348.3 CL
400 CL
FL
125
FL
100
F
8
EDEN EVANS CENTER FL FL EDEN-EVANS CENTER FRD
!
( 556.38 CL 870(S) 295.04
7
FL FL F FL
!
(
170 CL 90CL
RD 32 F FL
EDEN-EVANS CENTER RD FL F FL F
233.55 118.32 CL
32
170 CL 170 CL
16
U
180 CL 255 CL 200 C
494.40 CL 240.28CL 50(S) 180(S) 450 CL 1198.02 CL 1104.18 CL 352.42 200 CL 448.16 CL 224.08 300 CL 262.12 200C 421.21 CL 200 CL 100 400 CL
512.91C
200 CL L 240.4 CL 150 C
200 CL
393.93 300 CL 516 CL 600
L 175 CL
365.54 CL 200 CL 200 CL 175.00 CL
748 CL 502.2 CL
L
100 CL
231 CL 125 CL
175 )
Y
L
MC 3912
560( S)
120 80 400(S ) (S 770(S)
ANGOLA FIRE PROTECTION DISTRICT
1.4 A(C) 1.4 A(C)
CL CL CL
W
1
2.3A(C) 2.3A(C) 2.3A(C) 2.3A(C) 2.3A(C) (S) 3 A 2.3 A(C)
0
.7
10
2.9 A(C) 1.1 A(C) 231 CL 231 CL 231 CL
4
4.25 A(C) 10.5 A(C)
4
300 CL 300 CL
1.24 A
7
20
5.8 A(C) 5.7 A(C) TH
12
15
8
L 22 (S
11.112 12.11 14 4
380 CL 10 A
C
3.9 A(C)
)
39
1.22
11.13
11.121
213(S
11.113
380 CL
2.16 A(C)
S)
11.111
380 CL
2.21 448.4 CL
396.79 12
231 CL 438.6
)
48
11.2
)
54
546.48 CL 546.48 CL
255
645.01 CL
546.49 CL 546.48 CL 546.48 CL
31 248.0
AT
546.48 CL
546.49 C 546.49 C
(S
10 653 CL
C
710.62 CL
5.2 A(C)
7.
E (
3
2.9 A(C)
L L
) ) M
645 CL
108.7
435 0 108.7
(S C 18
46
E)
709 CL 731.23
54
1
2.1
(
CL
44 A(
0 92 231 CL
1.48 A(C) ST
660 C
NOTES REVISION TABLE SPECIAL DISTRICTS LEGEND
660 C
W
11.79 A(C)
20
8.12
175
L L
175.00 ID
TAX MAP
4. 32
4.5 A(C)
0 7.
221.00
.4
0(
5
PREPARED BY SCH
93
®
10 12 S)
TOWN OF EVANS
'
RK
00
205.00 206.00 207.00
DIVISION OF REAL PROPERTY TAX SERVICES TOWNSHIP 08
DATE MADE BY CHANGES OR ADDITIONS SCHOOL DRAINAGE PROPERTY LINE TOWN LINE
(1
FIRE DISTRICT LINE F CALCULATED ACREAGE 7.5 A(C) YO
FL THIS MAP WAS PREPARED FOR TAX PURPOSES ONLY
ERIE COUNTY, NEW YORK
RANGE 09
AND IS NOT TO BE REPRODUCED OR USED FOR 7/8/2024 LMO BLK. 5; 1.1 INTO 1.11 & 1.12 ORIGINAL SUBLOT LINE FL VILLAGE LINE DENOTES COMMON OWNER DEED ACREAGE 17.5 A
220.00 222.00
ERIE COUNTY, NEW YORK
RAILROAD BLOCK LIMIT SCALED DIMENSION 225 (S) NE
SURVEYING OR CONVEYANCING. 2/10/2023 JCS BLK. 4; 1 INTO 1.1 & 1.2 FIRE SEWER W 400 0 400
GREAT LOT LINE TAX MAP BLOCK NO. 3
( SCALED DIMENSION (CHECKED) 743.25(S)
1
MAP CONVERTED TO GIS FORMAT BY BERGMANN ASSOCIATES (2011)
ORIGINAL MAP PREPARED BY AERO SERVICE (1981)
2 MAP PREVIOUSLY CONVERTED TO AUTOCAD DIGITAL FORMAT
BY ANALYTICAL SURVEYS INC. IN COOPERATION
F
WITH WEILER MAPPING INC. (1999)
8/17/2022
6/14/2022
6/10/2022
JCS
JCS
JCS
BLK. 5; 26.1 INTO 26.11 & 26.12
BLK. 4; ADJ 1 & 38
BLK. 5; 36 INTO 36.1 & 36.2
WATER
STREAM OR DITCH
ROAD OR RAILROAD BNDY
COUNTY LINE
SCHOOL DISTRICT LINE
WATER DISTRICT LINE
SEWER DISTRICT LINE
SCH
W
S
TAX MAP PARCEL NO.
FILED PLAN LOT NO.
GREAT LOT NO.
11 6 . 0 0 - 1 - 11
14
9 (
DEED DIMENSION
DEED DIMENSION (CENTER LINE)
COORDINATE LOCATOR
173.33
173.33 CL
!
235.00 236.00 237.00
SHEET INDEX
GRAPHIC SCALE
1" = 400' MAP DATE: 3/3/2025
Page 76
Exhibit 5
Property Deed with Legal Description
Page 77
Page 78
Page 79
Exhibit 6
Environmental Assessment Form
Page 80
Short Environmental Assessment Form
Part 1 - Project Information
Instructions for Completing
Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as
thoroughly as possible based on current information.
Complete all items in Part 1. You may also provide any additional information you believe will be needed by or useful to the lead
agency; attach additional pages as necessary to supplement any item.
Part 1 – Project and Sponsor Information
Name of Action or Project:
Delamater
Project Location (describe, and attach a location map):
Brief Description of Proposed Action:
Niagara Mohawk Power Corporation d/b/a National Grid (“National Grid”), is the record owner of 8175 Delamater Road, SBL 221.00 4 38
(“Property”), in the Town of Evans, where National Grid operates its Delameter Road Substation on the Property. National Grid petitions the
Town Board to rezone the Property from Rural Agriculture (R-A) to Light Industrial (LI) and to amend the Official Zoning Map of the Town. The
rezoning brings the Property’s zoning in line with its long-standing use. The substation has operated on the Property for decades, but the R A
District does not list public utility stations among its permitted uses. The substation is therefore nonconforming. No expansion is proposed as
part of this rezoning. However, under Zoning Law § 200 30.C(1), a nonconforming use may not be “enlarged or increased,” and no structure
devoted to that use, conforming or not, may be “enlarged, extended, constructed, reconstructed or moved.” The LI District permits “public utility
stations or exchanges” as of right. Zoning Law § 200 24.B(1)(f). Rezoning to LI, would make the existing use conforming without introducing a
new use. Note site work is proposed; under Zoning Law § 200 42, future site improvements would be subject to site plan review.
Name of Applicant or Sponsor: Telephone: (716) 858-3878
National Grid by Barclay Damon LLP as agent/attorney. E-Mail: [email protected]
Address:
200 Delaware Avenue, Suite 1200
City/PO: State: Zip Code:
Buffalo NY 14202
1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES
administrative rule, or regulation?
If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that
may be affected in the municipality and proceed to Part 2. If No, continue to question 2.
✔
2. Does the proposed action require a permit, approval or funding from any other government Agency? NO YES
If Yes, list agency(s) name and permit or approval:
✔
3. a. Total acreage of the site of the proposed action? 6.78 acres
b. Total acreage to be physically disturbed? 0.00 acres
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor? +/- 19.85 acres
4. Check all land uses that occur on, are adjoining or near the proposed action:
□ Urban ■ Rural (non-agriculture) ■ Industrial Commercial ■ Residential (suburban)
□ Forest ■ Agriculture Aquatic ■ Other(Specify): solar, water tower, railroad, cell
Parkland tower
Page 1 of 3 SEAF 2026
Page 81
5. Is the proposed action, NO YES N/A
a. A permitted use under the zoning regulations?
✔
b. Consistent with the adopted comprehensive plan?
✔
NO YES
6. Is the proposed action consistent with the predominant character of the existing built or natural landscape?
✔
7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? NO YES
If Yes, identify:
✔
NO YES
8. a. Will the proposed action result in a substantial increase in traffic above present levels?
✔
b. Are public transportation services available at or near the site of the proposed action?
✔
c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed
action? ✔
9. Does the proposed action meet or exceed the state energy code requirements? NO YES
If the proposed action will exceed requirements, describe design features and technologies:
✔
10. Will the proposed action connect to an existing public/private water supply? NO YES
If No, describe method for providing potable water:
No potable water on-site. ✔
11. Will the proposed action connect to existing wastewater utilities? NO YES
If No, describe method for providing wastewater treatment:
No wastewater produced. ✔
12. a. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district NO YES
which is listed on the National or State Register of Historic Places, or that has been determined by the
Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the ✔
State Register of Historic Places?
b. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for
✔
archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain NO YES
wetlands or other waterbodies regulated by a federal, state or local agency?
✔
b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody?
✔
If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres:
Parcel is approximate to little sister creek tributaries but will not impact any nearby waterbodies
or wetlands. No site disturbance is proposed as part of the action.
Page 2 of 3 SEAF 2026
Page 82
14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply:
□ Shoreline □ Forest Agricultural/grasslands ■ Early mid-successional
Wetland □ Urban ■ Suburban
15. Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or NO YES
Federal government as threatened or endangered?
✔
16. Is the project site located in the 100-year or 500-year flood plain? NO YES
✔
NO YES
17. Will the proposed action create storm water discharge, either from point or non-point
sources?If Yes, ✔
a. Will storm water discharges flow to adjacent properties?
b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)?
If Yes, briefly describe:
18. Does the proposed action include construction or other activities that would result in the impoundment of water NO YES
or other liquids (e.g., retention pond, waste lagoon, dam)?
If Yes, explain the purpose and size of the impoundment:
✔
19. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste NO YES
management facility?
If Yes, describe:
✔
20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or NO YES
completed) for hazardous waste?
If Yes, describe:
✔
NO YES
21. Is the project located within, or within ½ mile of, a disadvantaged community?
✔
If No, could impacts from the project affect a disadvantaged community?
✔
If Yes to either question in 21, answer the following question.
a. Identify the potential pollution impacts of the project, either direct or indirect, that may occur within the
disadvantaged community (e.g., wastewater discharges, air emissions, noise, odors, solid or hazardous waste
generation or management):
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF
MY KNOWLEDGE
Applicant/sponsor/name: Niagara Mohawak d/b/a National Grid by Barclay Damon LLP Date: October 13, 2026
Signature: /s/ Ari M. Goldberg Title: attorney/agent
Page 3 of 3 SEAF 2026
Page 83
EAF Mapper Summary Report Tuesday, October 13, 2026 10:10 AM
Disclaimer: The EAF Mapper is a screening tool intended to assist
project sponsors and reviewing agencies in preparing an environmental
assessment form (EAF). Not all questions asked in the EAF are
answered by the EAF Mapper. Additional information on any EAF
question can be obtained by consulting the EAF Workbooks. Although
the EAF Mapper provides the most up-to-date digital data available to
DEC, you may also need to contact local or other data sources to
confirm data provided by the Mapper or to obtain data not provided by
the Mapper.
Part 1 / Question 7 [Critical Environmental No
Area]
Part 1 / Question 12a [National or State No
Register of Historic Places or State Eligible
Sites]
Part 1 / Question 12b [Archeological Sites] No
Part 1 / Question 13a [Wetlands or Other Yes - Digital mapping information on local, New York State, and federal
Regulated Waterbodies] wetlands and waterbodies is known to be incomplete. Refer to the EAF
Workbook.
Part 1 / Question 15 [Threatened or No
Endangered Animal]
Part 1 / Question 16 [100 or 500 Year No
Floodplain]
Part 1 / Question 20 [Remediation Site] No
Part 1 / Question 21 [Disadvantaged No
Community]
Short Environmental Assessment Form - EAF Mapper Summary Report 1