Southtowns Record

6-2-26 - Recommendation, Lead Agency, and Site Plan Approvals

Government
Town of Evans
Board
Town Board
Meeting
Jun 2, 2026
Kind
Minutes
Topics
Water, sewer and drainage, Zoning and land use, Budget and taxes, Housing, Parks and recreation, Public safety, Roads and traffic

Original document

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. Before we begin tonight’s meeting, we have some housekeeping we need to take care of; regarding minutes from the April 22nd, 2026, public meeting. Are there any additions, corrections, or questions, or may I please have a motion to accept them as submitted. Motion: Joe Pinter Second: Madeleine Dewey Vote: all in favor

    Carried unanimously, seconded by Madeleine Dewey Vote

    Page 1 of the minutes, motion 1

  2. Chair Szewczyk: Motion carried.

    Carried

    Page 1 of the minutes, motion 2

  3. BE IT FURTHER RESOLVED, that the Planning Board hereby recommends that Town Board (as SEQR Lead Agency) approves the Preliminary Plat and issues a Negative Declaration, thereby concluding that the project will not adversely affect the natural resources of the State and/or health, safety, and welfare of the public and is consistent with social and economic considerations. Roll Call Vote: All in favor… Carried.

    Carried unanimously

    Page 4 of the minutes, motion 3

  4. WHEREAS, the Evans Planning Board before them a Site Plan Review Application prepared by Tredo Engineers on behalf of Melody Meadow Estates (“the Applicant”) for a proposed expansion of the current mobile home park with supporting infrastructure and lot layout for 75 new units located at 8930 Erie Rd., Angola, NY (SBL. 235.00-2-6.1); and WHEREAS, the Planning Board seeks to commence coordinated review of this action and seeks to act as Lead Agency pursuant to the requirements of the State Environmental Quality Review Act (“SEQR”), New York State Environmental Conservation Law, Article 8 and 6 NYCRR Part 617; and WHEREAS, the Planning Board determines that it is the most appropriate agency to…

    Carried unanimously

    Page 5 of the minutes, motion 4 (full wording)

  5. 3. Site Plan – Resolution to determine SEQR declaration and to approve the proposed construction of eight (8) apartment buildings, housing eight (8) units each on a 6± acre portion of a 14± acre parcel located on North Main Street, Angola, NY. Property owners E&K Estates, LLC, SBL# 235.07-4-5. Petitioner: Metzger Civil Engineering, PLLC Background • On September 27, 2017 the Planning Board unanimously approved the site plan for

    Carried unanimously

    Page 5 of the minutes, motion 5; vote on page 6, motion 5

  6. • The Applicant shall address comments provided in the Town Engineer’s review dated May 8, 2026. • The Applicant shall perform a detailed Downstream Sewer Capacity Analysis to be submitted to the Erie County Division of Sewerage Management for approval. • The Applicant must meet all the requirements and obtain all necessary permits of the Erie County Highway Department. • The Applicant must meet all the requirements of the Erie County Water Authority. • All elements of the project will be constructed per the approved Site Plan and in compliance with the Town of Evans Code Enforcement, Planning and Engineering Department’s reviews and comments. • The applicant will c…

    Carried unanimously

    Page 8 of the minutes, motion 6 (full wording)

  7. BE IT FURTHER RESOLVED, final site plan approval and issuance of any building permits from the Town of Evans is conditioned on the successful completion of the following: • The Applicant shall address any outstanding comments provided in the Town Engineer’s review dated May 12, 2026. • The Applicant shall coordinate with NYSDOT to receive all approvals and permits to conduct work on NYS Route 5, including issuance of a Highway Work Permit for the proposed curb cut and roadside drainage. • Per Evans Town Code 70-7, any new businesses occupying the proposed units must first meet with the Director of Planning and Code Enforcement Officer to understand the nature of the business…

    Carried unanimously

    Page 11 of the minutes, motion 7 (full wording)

  8. • The Town will continue working through the Joint Application for Permitting process and receive all necessary approvals from any permitting agencies to perform the work, including the NYS Department of Environmental Conservation, the US Army Corps of Engineers, the NYS Department of State, and the NYS Office of General Services. Roll Call Vote: Roll Call Vote: All in favor… Carried.

    Carried unanimously

    Page 14 of the minutes, motion 8

  9. 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a † NO ✔ † YES reduction of an open space resource as designated in any adopted

    Carried

    Page 22 of the minutes, motion 10

  10. 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a † NO ✔ † YES reduction of an open space resource as designated in any adopted

    Carried

    Page 45 of the minutes, motion 11

1 routine motion (minutes, bills, agenda, adjournment…)
  1. Thank you everyone for joining our meeting this evening, whether in-person or remotely. May I please have a motion to adjourn. Motion: Lori Szewczyk Second: Kevin Hassen Roll Call Vote: Roll Call Vote: All in favor.

    Carried unanimously, seconded by Kevin Hassen Roll

    Page 14 of the minutes, motion 9; vote on page 15, motion 9

Text · page 16 of 74

Read the whole document on one page (all 74 pages, each with its own heading)

Agency Use Only [If applicable]
  Full Environmental Assessment Form  Project :  Commercial St. Major Sub

  Part 2 - Identification of Potential Project Impacts  Date :  5/27/26

Part 2 is to be completed by the lead agency. Part 2 is designed to help the lead agency inventory all potential resources that could
be affected by a proposed project or action. We recognize that the lead agency=s reviewer(s) will not necessarily be environmental
professionals. So, the questions are designed to walk a reviewer through the assessment process by providing a series of questions that
can be answered using the information found in Part 1. To further assist the lead agency in completing Part 2, the form identifies the
most relevant questions in Part 1 that will provide the information needed to answer the Part 2 question. When Part 2 is completed, the
lead agency will have identified the relevant environmental areas that may be impacted by the proposed activity.

If the lead agency is a state agency and the action is in any Coastal Area, complete the Coastal Assessment Form before proceeding
with this assessment.
Tips for completing Part 2:
  • Review all of the information provided in Part 1.
  • Review any application, maps, supporting materials and the Full EAF Workbook.
  • Answer each of the 18 questions in Part 2.
  • If you answer “Yes” to a numbered question, please complete all the questions that follow in that section.
  • If you answer “No” to a numbered question, move on to the next numbered question.
  • Check appropriate column to indicate the anticipated size of the impact.
  • Proposed projects that would exceed a numeric threshold contained in a question should result in the reviewing agency
  checking the box “Moderate to large impact may occur.”
  • The reviewer is not expected to be an expert in environmental analysis.
  •  If you are not sure or undecided about the size of an impact, it may help to review the sub-questions for the general
  question and consult the workbook.
  • When answering a question consider all components of the proposed activity, that is, the Awhole action@.
  • Consider the possibility for long-term and cumulative impacts as well as direct impacts.
  • Answer the question in a reasonable manner considering the scale and context of the project.
 1. Impact on Land
  Proposed action may involve construction on, or physical alteration of,  † NO  † YES
  ✔
  the land surface of the proposed site. (See Part 1. D.1)
  If “Yes”, answer questions a - j. If “No”, move on to Section 2.
  Relevant  No, or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may occur  occur
 a. The proposed action may involve construction on land where depth to water table is  E2d  9
  ✔  9
  less than 3 feet.

 b. The proposed action may involve construction on slopes of 15% or greater.  E2f  9
  ✔  9

 c. The proposed action may involve construction on land where bedrock is exposed, or  E2a  9
  ✔  9
  generally within 5 feet of existing ground surface.
 d. The proposed action may involve the excavation and removal of more than 1,000 tons  D2a  9
  ✔  9
  of natural material.
 e. The proposed action may involve construction that continues for more than one year  D1e  9  9
  ✔
  or in multiple phases.
 f. The proposed action may result in increased erosion, whether from physical  D2e, D2q  9  9
  ✔
  disturbance or vegetation removal (including from treatment by herbicides).
 g. The proposed action is, or may be, located within a Coastal Erosion hazard area.  B1i  9
  ✔  9

 h. Other impacts: _______________________________________________________  9  9
  ___________________________________________________________________

  Page 1 of 10
  FEAF 2019