1. Impact on Land: Yes 1.e. The proposed action may involve construction that continues for more than one year or in multiple phases. The construction of single-family homes will be done so in phases based on market demand. 1.f. The proposed action may result in increased erosion, whether from physical disturbance or vegetation removal (including from treatment by herbicides). Both temporary and permanent erosion controls will be used during and after construction. Temporary structural measures shall be used during construction to prevent off-site sedimentation. Permanent structural measures shall be utilized following construction and shall be implemented to convey surface water safely to the existing drainage ways present in the pre-development condition. The permanent structural measures shall remain in-place and continue to function after the completion of construction. 2. Impact on Surface Water: Yes 2.a. The proposed action may create a new water body. Water Quantity Control is being addressed by construction of a 0.65 ac-ft retention pond. The majority of the project area will be discharged into the retention pond. 2.d. The proposed action may involve construction within or adjoining a freshwater ortidal wetland, or in the bed or banks of any other water body. Seven (7) Federal wetland areas were identified onsite by Earth Dimensions, Inc. (EDI), totaling approximately 2.6 acres as per the report dated May 22, 2024. The project plans to disturb 0.094 acres of the Federal Wetlands and will avoid the remaining wetlands. The project will need a Nationwide Permit 14 for disturbances under 0.10 acre which is a pre-construction notification only. 3. Impacts on Plants and Animals: Yes 3.h. The proposed action requires the conversion of more than 10 acres of forest, grassland or any other regionally or locally important habitat. The total acreage of forestland to be physically disturbed is 15.6 acres of a 25.2-acre parcel. Nearly 35% of the site is proposed to be maintained as a conservation area, protected as undisturbed natural lands. Maintaining the natural tree cover and