Southtowns Record

6-2-26 - Recommendation, Lead Agency, and Site Plan Approvals

Government
Town of Evans
Board
Town Board
Meeting
Jun 2, 2026
Kind
Minutes
Topics
Water, sewer and drainage, Zoning and land use, Budget and taxes, Housing, Parks and recreation, Public safety, Roads and traffic

Original document

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. Before we begin tonight’s meeting, we have some housekeeping we need to take care of; regarding minutes from the April 22nd, 2026, public meeting. Are there any additions, corrections, or questions, or may I please have a motion to accept them as submitted. Motion: Joe Pinter Second: Madeleine Dewey Vote: all in favor

    Carried unanimously, seconded by Madeleine Dewey Vote

    Page 1 of the minutes, motion 1

  2. Chair Szewczyk: Motion carried.

    Carried

    Page 1 of the minutes, motion 2

  3. BE IT FURTHER RESOLVED, that the Planning Board hereby recommends that Town Board (as SEQR Lead Agency) approves the Preliminary Plat and issues a Negative Declaration, thereby concluding that the project will not adversely affect the natural resources of the State and/or health, safety, and welfare of the public and is consistent with social and economic considerations. Roll Call Vote: All in favor… Carried.

    Carried unanimously

    Page 4 of the minutes, motion 3

  4. WHEREAS, the Evans Planning Board before them a Site Plan Review Application prepared by Tredo Engineers on behalf of Melody Meadow Estates (“the Applicant”) for a proposed expansion of the current mobile home park with supporting infrastructure and lot layout for 75 new units located at 8930 Erie Rd., Angola, NY (SBL. 235.00-2-6.1); and WHEREAS, the Planning Board seeks to commence coordinated review of this action and seeks to act as Lead Agency pursuant to the requirements of the State Environmental Quality Review Act (“SEQR”), New York State Environmental Conservation Law, Article 8 and 6 NYCRR Part 617; and WHEREAS, the Planning Board determines that it is the most appropriate agency to…

    Carried unanimously

    Page 5 of the minutes, motion 4 (full wording)

  5. 3. Site Plan – Resolution to determine SEQR declaration and to approve the proposed construction of eight (8) apartment buildings, housing eight (8) units each on a 6± acre portion of a 14± acre parcel located on North Main Street, Angola, NY. Property owners E&K Estates, LLC, SBL# 235.07-4-5. Petitioner: Metzger Civil Engineering, PLLC Background • On September 27, 2017 the Planning Board unanimously approved the site plan for

    Carried unanimously

    Page 5 of the minutes, motion 5; vote on page 6, motion 5

  6. • The Applicant shall address comments provided in the Town Engineer’s review dated May 8, 2026. • The Applicant shall perform a detailed Downstream Sewer Capacity Analysis to be submitted to the Erie County Division of Sewerage Management for approval. • The Applicant must meet all the requirements and obtain all necessary permits of the Erie County Highway Department. • The Applicant must meet all the requirements of the Erie County Water Authority. • All elements of the project will be constructed per the approved Site Plan and in compliance with the Town of Evans Code Enforcement, Planning and Engineering Department’s reviews and comments. • The applicant will c…

    Carried unanimously

    Page 8 of the minutes, motion 6 (full wording)

  7. BE IT FURTHER RESOLVED, final site plan approval and issuance of any building permits from the Town of Evans is conditioned on the successful completion of the following: • The Applicant shall address any outstanding comments provided in the Town Engineer’s review dated May 12, 2026. • The Applicant shall coordinate with NYSDOT to receive all approvals and permits to conduct work on NYS Route 5, including issuance of a Highway Work Permit for the proposed curb cut and roadside drainage. • Per Evans Town Code 70-7, any new businesses occupying the proposed units must first meet with the Director of Planning and Code Enforcement Officer to understand the nature of the business…

    Carried unanimously

    Page 11 of the minutes, motion 7 (full wording)

  8. • The Town will continue working through the Joint Application for Permitting process and receive all necessary approvals from any permitting agencies to perform the work, including the NYS Department of Environmental Conservation, the US Army Corps of Engineers, the NYS Department of State, and the NYS Office of General Services. Roll Call Vote: Roll Call Vote: All in favor… Carried.

    Carried unanimously

    Page 14 of the minutes, motion 8

  9. 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a † NO ✔ † YES reduction of an open space resource as designated in any adopted

    Carried

    Page 22 of the minutes, motion 10

  10. 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a † NO ✔ † YES reduction of an open space resource as designated in any adopted

    Carried

    Page 45 of the minutes, motion 11

1 routine motion (minutes, bills, agenda, adjournment…)
  1. Thank you everyone for joining our meeting this evening, whether in-person or remotely. May I please have a motion to adjourn. Motion: Lori Szewczyk Second: Kevin Hassen Roll Call Vote: Roll Call Vote: All in favor.

    Carried unanimously, seconded by Kevin Hassen Roll

    Page 14 of the minutes, motion 9; vote on page 15, motion 9

Text · page 34 of 74

Read the whole document on one page (all 74 pages, each with its own heading)

William Smith
April 3, 2026
Page 2

  Please note, there is an option for people who have hired consultants, and for other
  environmental professionals with wetland expertise, to bypass the Albany Parcel
  Jurisdictional Determination (JD) and follow the Parcel JD-Consultant Option. Guidance
  on that process is online (via the above referenced link). Please note that Region 9 has
  some information that is required in addition to the statewide requirements for the
  Consultant Option (attached). The project sponsor should utilize the attached Region 9
  List of Requirements for their submission. The project sponsor must submit these
  requirements to the Region 9 Bureau of Ecosystem Health email address
  ([email protected]) with a request to utilize the Consultant Option, and a request to
  schedule a boundary verification. Please be aware that this option is only to be used
  to positively confirm wetland presence on the property. A delineation showing no
  wetlands would not be acceptable and would require the standard Jurisdictional
  Determination Request Form NYS Freshwater Wetlands Jurisdictional
  Determination Request Form.

  If the property contains regulated freshwater wetlands or adjacent areas, further
  delineation of the wetland boundaries and a Project Jurisdictional Determination (Project
  JD) may be required. A Project JD is a determination made by the regional DEC office
  about whether a proposed activity within a parcel containing regulated freshwater
  wetlands or adjacent areas requires an Article 24 Freshwater Wetlands permit. Project
  JD requests should be sent to the Region 9 Bureau of Ecosystem Health (BEH) at
  [email protected].

  If regulated freshwater wetlands or adjacent areas are present, all efforts must be made
  to first avoid disturbing the wetland and adjacent area. If disturbance to the wetland
  and/or adjacent area cannot be avoided, the project sponsor must submit a Freshwater
  Wetland permit application and obtain a permit to conduct a regulated activity. In
  accordance with DEC’s Freshwater Wetlands Permit Requirements Regulations (6
  NYCRR Part 663), the applicant would need to justify the disturbance, discuss
  alternatives and minimize impacts as part of the Freshwater Wetlands permit application.
  More information on application procedures and permit issuance standards is available
  on DEC’s website at: https://dec.ny.gov/regulatory/permits-licenses/waterways-
  coastlines-wetlands/freshwater-wetlands#Determine .

  2. Please recognize that this proposed project is defined as a Sanitary Sewer Extension
  and will require approval from the Erie County Department of Environment and Planning,
  Division of Sewerage Management (ECDSM), as well as approval from the Erie County
  Health Department, 503 Kensington Avenue, Buffalo, New York 14214, telephone
  716/961-6800, which acts as our agent and will be the approving agency. This Sanitary
  Sewer Extension project will also require stamped Professional Engineering Certification
  that the downstream capacity analysis [DSCA] and the proposed infiltration and inflow
  [I/I] mitigation work submitted for the project are in accordance with appropriate
  NYSDEC and ECDSM guidelines and standards.

  A detailed Downstream Sewer Capacity Analysis must be performed and submitted for
  the project as part of the Project’s Engineering Report. Recent wet weather flow
  monitoring data and proposed new development flow should be analyzed relative to
  theoretical capacity at key nodes in the downstream sewer system and at pump stations
  (if any) to determine if capacity exists.